SRIBHAVYA ENGINEERING SOLUTIONS PVT LTD

104-B, CHAITANYA CHAMBERS, CHAIT ANYAPURI,


HYDERABAD, TELANGANA, INDIA-500060

DOCUMENT / DRAWING TRANSMITTAL

To,
The Project Manager Transmittal No.: SES- QIDFA /2019-20/ 001
EMINENT ENERGY SERVICES Date : 26.09.2019
ADIB, Sheik khalifa street Project code: QIDFA PS UNIT#8 DISMANTLING
Abudhabi

Kind Attn.: Mr. S Janardhan Rao

Sub : QIDFA PS UNIT #8 DISMANTLING PROJECT


METHOD STATEMENT

Ref : Your Work Order No. EES/018/2019 dated 19-09-2019

Dear Sir,

We are forwarding the following Documents/Drawings for action as indicated in the table below:

C – For Information /
A - Approval X B – For Review
Document(s) / Reference / Records
Drawings for D – Released for
E – As Built F – For further action
Construction

Sl. Drawing / Document No. Rev No. of Document Description/ Title Category
No No Copies
1. QIFDA- EES- GEN- 001 0 1 Method Statement A

With Regards,

For Sribhavya Engineering Solutions Pvt Ltd

Authorized Signatory

Encl: As Above
SRIBHAVYA ENGINEERING SOLUTIONS PVT LTD
104-B, CHAITANYA CHAMBERS, CHAIT ANYAPURI,
HYDERABAD, TELANGANA, INDIA-500060

DOCUMENT / DRAWING TRANSMITTAL

NOTES

(Enclosure to the Letter of Transmittal No. SES-QIDFA-2019-001 dated: 26-09-2019)

S. No Eminent Comment SES Response


1. Please review once again and it’s observed 1.Changes are made as per instruction
that, some items are repeated. We have suggestion in the commented document
considered only required contents related
with site activities. 2. Sequence of dismantling works also
Sequence of site dismantling work will start updated with minor corrections.
with sub systems then finally Generator and
Accessories compartment. Please 3.HSE policies are modified as instructed
implement as required.
HSE topics are more elaborated; it’s not
required to have more details like NEBOSH
/ IOSH. Please reduce the contents and
prepare short and it’s should cover
everything.