Power Calculation Scheme for MH Cyber

SR No Server load Nos.


1 Server Racks 79
2 Mux Room-1 3
3 Mux Room-2 3
4 Hub Room- Total 12 Nos Room 12
5 Staging Room 4
6 Telcom Room-1 3
7 Telcom Room-2 3

Total Critical IT DC Load 107

Sr. no Server Rack UPS

1 IT load (AC) including PDU losses (1.5%) 819.3


2 Loading factor 80%
3 Power factor 1
4 Total power for UPS selection (with 15 min backup) 1024
5 Total nos. of UPS selected for N configuration 3
6 UPS capacity 341.4
7 UPS efficiency (As per manufacturer's data sheet) 96%
UPS selected is 6 nos of 400 kW 3+3

Sr. No UPS Selection for Utility load

1 Server room cooling unit 23


2 Electrical room cooling unit 3.4
3 Mux Room cooling unit 2
4 HUB room 0.5
5 Staging Room 2.3
6 Telco room 0.8
7 Emg. lighting for DC room 7
8 Chiller Pump 30
9 IBMS 8
10 Total Load 77

11 Loading factor 80%


12 Power factor 0.9
13 Total power for UPS selection (with 15 min backup) 106.9
14 Total nos. of UPS selected for N configuration 1
15 UPS capacity 106.9
16 UPS efficiency (As per manufacturer's data sheet) 96%
UPS selected is 2 nos of 120 kW (1W+1S)

Sr. No UPS Selection for Building Load


1 Power required for lighting workstations,Vedio walls,Printer, etc. 236
2 Loading factor 80%
3 Power factor 1
4 Total power for UPS selection (with 15 min backup) 295
5 Total nos. of UPS selected for N configuration 1
6 UPS capacity 295
7 UPS efficiency (As per manufacturer's data sheet) 96%
UPS selected is 2 nos of 300 kW (1W+1S)

Sr. no Transformer/ DG (Total load)


Data Center Power
1 Total power consumed by Server rack UPS along with Battery Charging 904
2 Total power consumed by PAC unit and other load UPS 85.8
4 Total power for chiller 411
5 Total lighting Load 12
6 DC VRV Load + TAF Load 45
7 Miscellaneous load 38
Total power consumption for Data Center 1496
Office area load
1 Power required for workstations cooling all floors 448
2 Raw power load - plumbing pumps, ventilation, lifts, etc. 150
3 TFA load 9
4 Total power consumed by UPS including battery charging 259
Total power consumption for office Area 866
Total Power 2362
Power factor for transformer 0.9
Power factor for DG sets 0.8
Loading factor for Transformer 0.9
Loading factor for DG Sets Continuous 0.8
Total power for Transformer selection (Total Building) 2915.9
Total power for DG selection (only for Building load) 1353.1
Total power for DG selection (only for Data Center Data Center) cc 2337.3
er
KW ratingPowerUnit
9.0 711 kW
4.0 12 kW
4.0 12 kW
2.0 24 kW
9.0 36 kW
2.0 6 kW
2.0 6 kW

807 kW

kW

kVA=kW
Nos
kVA

kW
kW
kW
kW
kW
kW
kW
kW
kW
 kW

kVA=kW
Nos
kVA
kW

kVA=kW
Nos
kVA

kW
kW
kW
KW
KW
KW
kW

kW
kW
kW
kW
kW
kW

kVA 3150 KVA Oil type Transfromer selected


kVA 1850 kVA DG Selected
kVA 2 Nos 1250kVA DG Selected for N Capacity
6 nos 1250kVA for (2(N+1)) configuration
SR No 1. Server load Nos.
1 Server Racks 35
2 Mux Room-1 3
3 Mux Room-2 3
4 Hub Room- 1&2 0
5 Staging Room 2
6 Telcom Room-1 3
7 Telcom Room-2 3
8
Total Critical IT DC Load 49

Sr. no Server Rack UPS

1 IT load (AC) including PDU losses 375


2 Loading factor 80%
3 Power factor 1
4 Total power for UPS selection (with 15 min backup) 468
5 Total nos. of UPS selected for N configuration 2
6 UPS capacity 234
7 UPS efficiency (As per manufacturer's data sheet) 96%

UPS selected is 4 nos of 250 kW (2+2)

Sr. No UPS Selection for PAC Unit,IBMS,Pump,W/S load

1 Cooling Load 59
2 Loading factor 80%
3 Power factor 1
4 Total power for UPS selection (with 15 min backup) 75
5 Total nos. of UPS selected for N configuration 1
6 UPS capacity 75
7 UPS efficiency (As per manufacturer's data sheet) 96%
UPS selected is 2 nos of 100 kW (1W+1S)

Sr. No UPS Selection for Utility load

1 Server room cooling unit 16


2 Pump load 18
3 BMS Load 3
4 Lighting load 3
5 Power required for workstations Printer, etc. 20
6 Total Load 60.0

7 Loading factor 80%


8 Power factor 1
9 Total power for UPS selection (with 15 min backup) 75
10 Total nos. of UPS selected for N configuration 1
11 UPS capacity 75
12 UPS efficiency (As per manufacturer's data sheet) 96%
UPS selected is 2 nos of 100 kW (1W+1S)

Sr. no Transformer/ DG (Total load)


Data Center Power
1 Total power consumed by Server rack UPS along with Battery Charging 413
2 Total power consumed by pahu+pump+light+W/S 68
2 Power required for other area cooling+TFA 35
4 Total power for chiller 219
7 Miscellaneous load 5
9 Total power consumed by Lighting 2
10 Raw power load - ventilation, etc. 15
Total Power 757
Power factor for transformer 0.95
Power factor for DG sets 0.8
Loading factor for Transformer 90%
Loading factor for DG Sets 80%
Loading factor for DG Sets (FOR CONTINIUS ###
Total power for Transformer selection (Total Building) 886
Total power for DG selection (only for Data Center Data Center) ###
Total power for DG selection (only for Data Center Data Center) 947
KW rating Power Unit
9.0 315 kW
4.0 12 kW
4.0 12 kW
2.0 0 kW
9.0 18 kW
2.0 6 kW
2.0 6 kW

369 kW

kW

kVA=kW
Nos
kVA

oad

kW

kVA=kW
Nos
kVA=kW

kW
kW
kW
kW
kW
 kW

kVA=kW
Nos
kVA

kW
kW
kW
kW
KW
kW
kW
kW

kVA 1000 KVA Oil type Transfromer selected


kVA 1250 kVA DG Selected
kVA 2 Nos 1250kVA DG Selected for N Capacity