Professional Documents
Culture Documents
Table of Contents & Instructions: Highlighted
Table of Contents & Instructions: Highlighted
Contents &
Instructions
Instructions:
1. Highlighted areas of sheets (use navigation at bottom) to be completed by the Client Organization prior
to the off-site review, or on-site Gap Analysis or Upgrade Audit, and submitted to the NSF-ISR Lead Auditor
for review.
2. The Annex has been provided at the end of this document for information and reference purposes only,
and includes a comparison of ISO 14001 and RC14001 versions (Annex I) and the Process & Product Safety
Codes (Annex II).
3. Completion by the Client Organization should include the final statement of readiness for Upgrade by
the Top Management of the Client Organization.
4. Items in black font correspond to ISO 14001:2015 and those in blue correspond with special requirements
associated with RC 14001:2015.
5. The columns for “Planned Completion Date” and “Responsibility” may be used by the Client
Organization to develop their plan for upgrading to the requirements of RC14001:2015.
6. All other areas of the Checklist are required to be completed by the NSF-ISR Lead Auditor to confirm
the effective implementation of the Client Organization’s RC14001:2015 Management System.
7. The Lead Auditor shall sign the appropriate sections at the end of the Checklist to indicate: whether the
Client Organization is Ready/Not Ready for Upgrade Audit (Off-site review), AND the final approval of the
RCMS in meeting the requirements of RC14001:2015 (during the on-site Upgrade Audit)
8. This checklist shall be submitted by the NSF-ISR Lead Auditor as one of the records of the
RC14001:2015 Upgrade for the Client Organization.
Contents
(hyperlinks)
Overview of RC14001
General Information about your Organization Info needed
Organization Name:
Organization Address:
1st Shift :
2nd Shift :
Number of Personnel:
3rd Shift :
Temp. / Part-time :
Size of Facility:
Management Representative:
Name and Revision Status of
RC14001 documentation:
Risk Category:
FRS Number:
Audit type:
Off-site Review Date (Desk
Audit):
Audit Dates (on-site):
Lead Auditor / Audit Team:
Scope of Registration:
American Chemistry Council (ACC)
Responsible Care Member or Partner?
If yes to above, your organization must implement the RC 14001:2015, Product, and Processs Safety Codes as an obligation of membership.
(see tabs below for Process and Product Safety)
Significant Environmental
Aspects:
Occupational Health & Safety
Hazards & Risks:
Process Safety Hazards & Risks:
Security Issues:
The interval between the client Delta Review and the Upgrade Audit should not exceed 90 days.
Question / Requirement
Environmental Occupational Health &
Evidence of determination Considerations Safety Considerations
of:
4.2 Understanding Needs & Did you identify those who are Did you identify those who are
Expectations of Interested interested in your environmental interested in your OH&S
Parties: performance performance
relevant to environmental
Did you determine the needs and relevant to OH&S performance
performance
expectations of your interested
parties?
4.3 Determining the scope of the Boundaries, products, services and Boundaries, products, services and
environmental management activities from an environmental activities from a OH&S
system: perspective? perspective?
Evidence of Leadership and environmental focus occupational health & safety focus
Commitment of TOP
MANAGEMENT (5.1)
Did you identify those who are Did you identify those who are
interested in your process safety interested in your security
& product safety performance performance?
applies applies
Level of Completion
0=Not Started to
10=Complete Reference
E=Environmental (0-10) Planned Document
OHS=Occupational Health & Completion Responsibility (Name / Rev. Level)
Safety (0-10) Date OR
PPS=Process Safety & Records
Product Safety (0-10)
SC=Security (0-10)
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
CEO Attestation -- Executive Contact Affirmation Statement of Product Safety Code Implementation, signed/dated statement by ACC Executive Contact AND Responsible Care
"In accordance with the implementation schedule, our company attests that the following management practices are in place as part of our processes and systems related to
stewardship performance" -- Auditor needs to get copies between 2014-2016 (ACC Webinar July 2013 -double check date and title here)
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
NSF-ISR Lead Auditor Review Comments
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
ned/dated statement by ACC Executive Contact AND Responsible Care Coordinator, stating
t practices are in place as part of our processes and systems related to product safety and
16 (ACC Webinar July 2013 -double check date and title here)
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
5.2 Environmental Policy
g) reflect a commitment to the any specific commitments related
may use other words
Responsible Care Guiding to OH&S
Principles
SIGNIFICANT environmental
aspects have been applies applies
COMMUNICATED among the
various levels and functions of the
organization (6.1.2)
Established CRITERIA is
Document criteria and
documented and utilized to Document criteria and organization's
organization's significant OH&S
determine significant environmental significant environmental aspects
aspects
aspects (6.1.2)
any specific commitments
any specific commitments related
related to Process Safety and
to security
Product Safety
Monitor emerging
process/product safety concerns
relevant to the organization’s
business for on-going proactive Security concerns
identification of hazards arising
from routine and non-routine
activities and situations
applies applies
applies applies
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
Change, including planned or new
or modified activities, products & include environmental
Services
applies applies
applies applies
Documented information of
Documented information of
process and product safety
Security compliance obligations
compliance obligations
How these actions are integrated How these actions are integrated
with business processes with business processes
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
7.1 Evidence that the organization
has determined and provided
RESOURCES needed for the
environmental included OH&S included
establishment, implementation,
maintenance and continual
improvement of EMS
7.4 .1 Communications:
The organization shall establish
and maintain dialogue with
employees and other interested
parties about its impact on the
applies applies
environment, its Responsible Care
Management System performance,
plans for improving the
organization’s performance and
management for relevant risks for:
Ø Chemical-related
applies applies
processes
applies applies
applies applies
applies applies
applies applies
applies applies
applies applies
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
7.5 Evidence that DOCUMENTED
INFORMATION is consistent with environmental included OH&S included
RC 14001:2015
Communicated to external
providers and contractors relevant
environmental included OH&S included
environmental requirements?
(8.1.c)
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
8.1 Operational Planning &
Control: The organization shall
establish and maintain: g) Systems to protect the g) Systems to protect worker
g) Systems to protect the environment, conserve resources - health and create a safe work
environment, conserve resources, emphasis on environmental environment
protect worker health and create a
safe and secure work environment
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
8.1 Operational Planning &
j) Participation in mutual assistance
Control: The organization shall j) Participation in mutual assistance
programs and sharing activities as
establish and maintain: programs and sharing activities as
embodied in Responsible Care,
j) Participation in mutual assistance embodied in Responsible Care,
Occupational Health & Safety
programs and sharing activities as Environmental Focus
Focus
embodied in Responsible Care
8.2 Emergency Preparedness & h) include appropriate participation in h) include appropriate participation
Response the development, implementation in the development, implementation
and maintenance of community and maintenance of community
h) include appropriate participation emergency preparedness plans, emergency preparedness plans,
in the development, implementation emphasis on potential emphasis on OCCUPATIONAL
and maintenance of community ENVIRONMENTAL RISKS, HEALTH & SAFETY HAZARDS,
emergency preparedness plans IMPACTS, MITIGATION RISKS AND MITIGATION
9.1.1 General
Environmental Performance: OH&S Performance:
The organization shall periodically
effectiveness of its communications effectiveness of its communications
evaluate the effectiveness of its
programs with its interested parties programs with its interested parties
communications programs with its
referred to in 4.2 referred to in 4.2
interested parties referred to in 4.2.
h) include appropriate
h) include appropriate
participation in the development,
participation in the development,
implementation and
implementation and maintenance
maintenance of community
of community emergency
emergency preparedness plans,
preparedness plans, emphasis
emphasis on PROCESS
on SECURITY
SAFETY & PRODUCT SAFETY
retention of documented
retention of documented
information as evidence -
information as evidence -
Process & Product Safety
security compliance
Compliance
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
Internal Audit Corrective Actions
(10.2.d) completed. (including environmental included OH&S included
evidence of closure)
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
10.2 Nonconformity and
corrective action: The
organization shall
Ø Identify and investigate Identify and investigate cause(s) of Identify and investigate cause(s) of
cause(s) of accidents and Environmental releases OH&S Incidents
incidents (including
environmental releases and
incidents)
Ø Assign significance
Ø Take appropriate
corrective action(s) to applies applies
prevent reoccurrence;
Note: This section is optional, and Note: This section is optional, and Note: This section is optional, and
may be completed if there are may be completed if there are unique may be completed if there are
unique aspects of the EMS that the aspects of the EMS that the Client unique aspects of the OH&S that
Client deems important in deems important in demonstrating the Client deems important in
demonstrating compliance to the compliance to the RC 14001: 2015 demonstrating compliance to the
RC 14001: 2015 Standard. Standard. RC 14001: 2015 Standard.
applies applies
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E= E= E= E=
OHS= OHS= OHS= OHS=
PPS= PPS= PPS= PPS=
SC= SC= SC= SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
E=
OHS=
PPS=
SC=
Approvals Back to Contents
Client Organization
Top Management
attests readiness for
Upgrade to RC14001:
2015
NSF-ISR Lead
Auditor Approval of
Desk Audit
information.
NSF-ISR Lead
Auditor Approval of
Compliance to
RC14001: 2015 at
On-site Upgrade
Audit.
The completed Checklist shall be submitted by the NSF-ISR Lead Auditor as a supplement
to the RC14001:2015 Audit Report
Client Organization
Top Management
attests readiness for
Upgrade to RC14001:
2015
NSF-ISR Lead
Auditor Approval of
Desk Audit
information.
NSF-ISR Lead
Auditor Approval of
Compliance to
RC14001: 2015 at
On-site Upgrade
Audit.
The completed Checklist shall be submitted by the NSF-ISR Lead Auditor as a supplement
to the RC14001:2015 Audit Report
Client Organization
Top Management
attests readiness for
Upgrade to RC14001:
2015
NSF-ISR Lead
Auditor Approval of
Desk Audit
information.
NSF-ISR Lead
Auditor Approval of
Compliance to
RC14001: 2015 at
On-site Upgrade
Audit.
The completed Checklist shall be submitted by the NSF-ISR Lead Auditor as a supplement
to the RC14001:2015 Audit Report
Client Organization
Top Management
attests readiness for
Upgrade to RC14001:
2015
NSF-ISR Lead
Auditor Approval of
Desk Audit
information.
NSF-ISR Lead
Auditor Approval of
Compliance to
RC14001: 2015 at
On-site Upgrade
Audit.
The completed Checklist shall be submitted by the NSF-ISR Lead Auditor as a supplement
to the RC14001:2015 Audit Report
Client Organization
Top Management
attests readiness for
Upgrade to RC14001:
2015
NSF-ISR Lead
Auditor Approval of
Desk Audit
information.
NSF-ISR Lead
Auditor Approval of
Compliance to
RC14001: 2015 at
On-site Upgrade
Audit.
The completed Checklist shall be submitted by the NSF-ISR Lead Auditor as a supplement
to the RC14001:2015 Audit Report
NSF-ISR Lead
Auditor Approval of
Desk Audit
information.
NSF-ISR Lead
Auditor Approval of
Compliance to
RC14001: 2015 at
On-site Upgrade
Audit.
The completed Checklist shall be submitted by the NSF-ISR Lead Auditor as a supplement
to the RC14001:2015 Audit Report
Back to Contents
Back to Contents
Comparing RC14001:2015 to RC14001:2013
New or Different in RC14001:2015 RC14001:2013
Old
RC14001:2015 New Section RC14001:2013
Section
RC 14001 Introduction
RC Interpretive Notes
Introduction
Normative References 2
Definitions
Terms & Definitions 3 3
Appendix 1
Terms Related to 3.1
Organization & Leadership
Terms Related to Planning 3.2
Terms Related to Support & 3.3
Operations
Terms Related to
Performance Evaluation & 3.4
Improvement
Context of the Organization 4
Understanding the Context of the 4.1
Organization
Understanding the Needs &
Expectations of Interested 4.2
Parties
Determining Scope of the
Environmental Management 4.3
Systems
Leadership 5
General 6.1.1
Environmen 6.1.2 4.3.1
tal Aspects
Compliance 6.1.3
Obligations
Planning 6.1.4
Action
Environmental Objectives & 6.2
Planning to achieve them
Environmen
tal 6.2.1
Objectives
Planning Actions to achieve 6.2.2
environmental objectives
Support 7
Resources 7.1 4.4.1/5.1
Competence 7.2
Awareness 7.3
Communication 7.4
General 7.4.1 4.4.3
Internal
Communica 7.4.2
tions
External
Communica 7.4.3 4.4.3
tions
Documented Information 7.5
General 7.5.1
Creating & 7.5.2
Updating
Control of
documente
d 7.5.3
information
Operation 8
4.4.6
Operational Planning &
Control 8.1 4.4.3
4.4.6
Emergency Preparedness & 8.2 4.4.7
Response
Performance Evaluation 9
Monitoring, measurement, 9.1
analysis and evaluation
4.4.3
General 9.1.1
4.5.1
Evaluation
of 9.1.2
Compliance
Internal Audit 9.2
General 9.2.1
Internal
Audit 9.2.2
Planning
Management Review 9.3
Improvement 10
General 10.1
Nonconformity and 10.2 4.5.3
corrective action
Continual Improvement 10.2
Annex A Guidance on the use of this
International Standard
Annex B Correspondence between ISO
14001:2015 & ISO 14001:2004
Annex C Responsible Care Organization &
Contact Information
Annex D The Nature and Purpose of RC
14001 Technical Specifications
Appendix References and Resources
Bibliography 3
Alphabetical Index of Terms
Document Control Information Document Control
Appendix ACC Responsible Care Initiative Requirement
2
Back to Contents
Comparing ISO 14001:2015 to ISO 14001:2004
New or Different in ISO 14001:2015 to ISO Covered in ISO 14001:2004
14001:2004
New Old
ISO 14001:2015 ISO 14001:2004
Section Section
Introduction 0
Background 0.1
Aim of Environmental Management 0.2
systems
Success Factors 0.3
Scope 1 1 Scope
General 6.1.1