You are on page 1of 1

E 12

A B C D F
1833 2167 2500 4500 10mm@160 C/C (B)

11 10mm@16011
C/C (B)

1100
5
C1 C2 C3 C4
FC1
3500

1100

COLUMN LINKS
150 THK PCC

COLUMN LINKS
4
C5 C6 C7 12
3
C8

LD
FC5 FC6 FOOTING FC6- PLAN

LD
(SCALE 1:25)
FC8
3000

2
C9
1 10mm@160 C/C (B)
C10 C11 C12 10mm@160 C/C (B)
FC10
EL. 1.500 EL. 1.500

300
BOF

300
BOF

150 THK PCC 150 THK PCC


10mm@160 C/C (B)
FOUNDATION PLAN 150
10mm@160 C/C (B)
1100 150 1100
SCALE 1:100M
SECTION 11-11 SECTION 12-12
DETAIL OF FOOTING FC6
DETAIL OF FOOTING FC6
(SCALE 1:25)
(SCALE 1:25)

FOOTING SCHEDULE (C20:Fy420)

FOOTING DIMENSION FOOTING REINFORCEMENT STIRRUPS


FOOTING COLUMN FOOTING SFR REMARKS
BOTTOM TOP
NUMBERS NUMBERS TYPE STEP L B D1 D2 ALONG B ALONG L
ALONG B ALONG L ALONG B ALONG L
FC1 C1 Pad - 950 950 300 - 10mm@160 C/C 10mm@160 C/C - - - - - -

FC6 C6 Pad - 1100 1100 300 - 10mm@160 C/C 10mm@160 C/C - - - - - -

FC8 C8 Pad - 1050 1050 300 - 10mm@150 C/C 10mm@150 C/C - - - - - -

FC10 C10 Pad - 1050 1050 300 - 10mm@150 C/C 10mm@150 C/C - - - - - -

DESIGNED BY: THIS DRAWING IS ISSUED FOR:


FROM THE OFFICE OF: PRC. NO. : 0168915 SEAL PROJECT TITLE PROJECT OWNER: SHEET CONTENTS: AS BUILT ESTIMATE SHEET NO.

DRAFTED BY: BIDDING FABRICATION


VALIDITY : 05/05/2022
PROPOSED TWO-STOREY BUILDING PERMIT OWNER'S APPROVAL

PTR. NO. : 22240463


ROLANDO G. ALCOMENDRAS
DATE:
CONSTRUCTION PRESENTATION S
LADY MAE BRIGOLI RESIDENTIAL HOUSE
SCHEDULE OF FOOTING

DATE : 05/31/19 DETAILED DESIGN OF FOOTING IMPORTANT : MEASUREMENTS ARE VERIFIED ON SITE AND ALL DISCREPANCIES
SHOULD BE REPORTED TO THE ARCHITECT. 1 6
THIS DRAWING ACTING AS INSTRUMENT OF SERVICE IS THE INTELLECTUAL PROPERTY
ADDRESS : BOJO, ALOGUINSAN, CEBU T.I.N. : 736-753-413-000 LOCATION: BRGY. POBLACION, TOLEDO CITY, CEBU ADDRESS : BRGY. POBLACION, TOLEDO CITY, CEBU OF THE ARCHITECT & CANNOT BE REPRODUCED WITHOUT THEIR WRITTEN CONSENT.

You might also like