TALI PROJECT - STRUCTURAL 28/09/22 100 MIN

250
B1

2-16mm TB
ROUGHEN SURFACE AND APPLY
10mm STIRR. SP. 1@50, HIT-HY 200R EPOXY (OR EQUIVALENT)

400
8@100, REST@200mm O.C. ADHESIVE PRIOR TO POURING OF
3-16mm BB NEW CONCRETE

TYPICAL B1 DETAIL

A B C D EX. COL

TYPICAL B1 TO EXISTING COLUMN


CONNECTION
12555

4165 4215 4175

EXISTING RAFTER

1
2355

3530 3530 3530

B12 SW
B1
SW
2 B1
SW
2
200x75x1.6mm GALVANISED
2 STEEL CONNECTOR PLATE
75x75x10mm ANGLE
S1 S1 S1 WITH 8-35x3.15mm NAILS
BRACKET WITH 1-M16 (8.8)
SW SW
2000

2000
BED ROOM 2 T&B BED ROOM 3 T&B BED ROOM 4 T&B

(4 EACH END)
3 3

D D D THROUGH BOLTS
B1

3 3 3
4175

B1
CLOSET CLOSET
B1 B1 CLOSET
B1

B1

B1

2175
2-M12 (8.8) HIT-Z ANCHORS.

TV
TV

TV

3 100mm MIN EMBEDMENT


INTO EXISTING COLUMN
14973

BED ROOM 2 BED ROOM 3 BED ROOM 4

WITH HIT-HY 200R EPOXY

12555
SW SW
4215

4215
4 4

4" x 4" H4 TREATED


4 SD SD SD
TIMBER POST
3 2 4

UP

OPEN BALCONY
4165

4165
B1

DETAIL A
DETAIL A
5

3880 3930 3890

12840

SLANTING POST DETAIL


SCHEDULE OF SLABS

S1

TYPICAL STAIR DETAILS