You are on page 1of 1

BASEMENT 230 230

UN FINISH FL. LVL.


BASEMENT
UN FINISH FL. LVL.
COLUMN
TIE BEAM TIE BEAM
UP TO GOOD SOIL (MINI.1800)

8T@150c/c- HORI. 8T@150c/c- HORI.


EACH FACE EACH FACE

LIFT PIT DEPTH


C2
8T@125c/c- VERT. 8T@150c/c- VERT.

1000
EACH FACE EACH FACE
1100

16T@150c/c THROUGH 12T@125c/c, BOTHWAYS 12T@125c/c


BOTTOM BOTHWAYS BOTTOM EXTRA STEEL BOTTOM B/W JALI
12T@150c/c THROUGH
300

300
C11 EXTRA STEEL

1000
TOP BOTHWAYS
150

P.C.C.(1:3:6)

300

300
2440 1220 1220

1100
150 5044 150 16T@750c/c
CHAIR (TYP.)
5344 16T@150c/c THROUGH
BOTTOM BOTHWAYS

300

300
450 450 450 450 450 450
CFT-1 SECTION : A - A
CFT-1

150
P.C.C.(1:3:6)

150 5199 150


5499

CFT-2 SECTION : B - B

230 115

BASEMENT
UN FINISH FL. LVL.

8T@150c/c- HORI. 8T@150c/c- HORI.


EACH FACE EACH FACE
LIFT PIT DEPTH

1200

1200
8T@125c/c- VERT. 8T@150c/c- VERT. COLUMN 12T@100c/c
EACH FACE EACH FACE AS PER DETAIL BOTTOM B/W JALI
EXTRA STEEL
C5 C5

1200
12T@150c/c THROUGH

1200
TOP BOTHWAYS

1200 1200
1200 1200
300

300
1150

1100
16T@125c/c THROUGH 12T@100c/c, BOTHWAYS 12T@100c/c, BOTHWAYS C6
BOTTOM BOTHWAYS 450
BOTTOM EXTRA STEEL BOTTOM EXTRA STEEL LIFT
300

300
450 450 450
450

1100
C7
150

P.C.C.(1:3:6)

2000 2000 1000 1000

1075
150 8900 150
12T@100c/c 12T@100c/c
9200 BOTTOM B/W JALI BOTTOM B/W JALI
EXTRA STEEL 1000 1000 EXTRA STEEL
CFT-3 SECTION : C - C

CFT-3

DATE ISSUE TO PURPOSE REMARKS REV. NO. PROJECT NO. PROJECT :- CONSULTANT:-
DATE :- 28/09/2021
KENA POLISH RESIDENCY SHREEJI STRUCTURALS
28-09-2021 ARCHITECT FOR EXECUTION R-0
SCALE :- N.T.S. R/0 503-504, ABHIJYOT SQUARE,
B/H. DIVYABHASKAR PRESS, S.G. HIGHWAY,
SATELLITE, AHMEDABAD-380 015.
DRAWING NO. TITLE :-
PH:- (079) 40059500, MOBILE:-9033049202 (H.O.)
S- 01c
FOUNDATION DETAIL - 2 NIKOL OFFICE MOBILE :- 9909027744 (B.O.)
EMAIL:-contact@shreejistructurals.com

You might also like