You are on page 1of 5

FACTORY MOM

SR NO. SPECIFIC WORK RESPONSIBLE PERSON TARGET DATE REVISE TARGERT DATE
1 INCREASE M/C HP IN UNIT -2 (35-50 HP) MR PRAGNESH 15.10.2019
2 WORK INSTRUCTION , PROCESS FLOW CHART,CYCLE TIME STUDY MR.SHOBIN 18.09.2019
3 FAN BLADE VOLTAS STATUS MR. NIKUMBH 30.09.2019
4 ISO FORMAT PREPARETION & RECORD FOR R & D MR.PARTH 15.10.2019
5 G.A.DRAWING MODEL WISE MR.BIPIN 15.10.2019
6 SOLVE PRESS M/C 200 TR BREAK DOWN ISSUE MR.BIPIN 26.09.2019
DIE REPEARING FROM VISHVAKARMA (BLOWER BLADE DIE,TUBE
7 MR.BIPIN 28.09.2019
SHEET DIE,22" FRONT PANEL REVERSE EMBOSSING
8 24" FRONT PANEL STEP BENDING DIE MR.BIPIN 05.10.2019
9 FINALISED QUOTATION FOR 16 MM REDIUS DIE MR.BIPIN 25.09.2019
10 FINALISED QUOTATION FOR BLOWER HUB REVITING DIE MR.BIPIN 25.09.2019
12 DRESS,SHOES & IDENTI CARD FOR NEW STAFF EMPLOYEE MR. NARENDRA 30.09.2019
13 NEW FASTNER FOR ODU STAND MR. MALI 10.10.2019
14 ALUMINIUM SCRAP FOR E WASTE MR. MALI 30.09.2019
15 BLOWER BLADE PUSHING PLUNGER ARRANGEMENT MR.BIPIN 25.09.2019
16 CCTV INSTALLATION-UNIT 2 MR. NARENDRA 30.09.2019
17 SAMPLE HUB FROM NEW SUPPLIER -KOLHAPUR MR. NITESH 05.10.2019
18 FAN BLADE BALANCING M/C CALIBRATION MR. NITESH 05.10.2019
19 BLOWER RUN OUT CHECKING DIAL GAUGE SET UP MR.SHOBIN 28.09.2019
REMARK
FACTORY MOM
SR NO. SPECIFIC WORK
1 CORRUGATED BOX QUOTATION (BOX AS PER THERMACOL PACKING)
2 D.G.SET PURCHASE

SET UP FAN BLADE & BLOWER ALIGNMENT


3
4 WORK INSTRUCTION , PROCESS FLOW CHART,CYCLE TIME STUDY
5 CABIN SET UP & LIGHT ARRANGEMENT
6 DAILY CUSTOMER ORDER & FOLLOW UP MAINTAIN IN EXEL SHEET
7 D.G.SET QUOTATION
8 LATHE M/C SPARE PART
9 PP BOX FOR FAN BLADE & BLOWER
10 QUOTATION FOR 24" FRONT PANEL STEP BENDING DIE
11 QUOTATION FOR 16 MM REDIUS DIE
12 QUOTATION FOR BLOWER HUB REVITING DIE
13 TUBE SHEET DIE HARDNING FROM ACCURATE
14 BLOOD DONATION CAMP POSTER DISPLAY
15 KAIZEN SHEET SEP.2019
16 TUBE SHEET DIE HARDNING FROM ACCURATE
FACTORY MOM
RESPONSIBLE PERSON TARGET DATE
MR PRAGNESH 19.09.2019
MR PRAGNESH 19.09.2019

MR.PANDEY 18.09.2019

MR.SHOBIN 18.09.2019
MR.PANDEY 18.09.2019
MR. NIKUMBH 14.09.2019
MR.BIPIN 20.09.2019
MR.BIPIN 16.09.2019
MR. MALI 21.09.2019
MR.BIPIN 25.09.2019
MR.BIPIN 25.09.2019
MR.BIPIN 25.09.2019
MR.BIPIN 25.09.2019
MR. NARENDRA 24.09.2019
MR.SHOBIN 24.09.2019
MR.BIPIN 25.09.2019
REMARK
CLOSED
PURCHASE PLAN FOR NEXT YEAR
UNBOLTED FROM OLD LOCATION AND RELOCATION
REMAINING
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED

You might also like