ITEM DATE NO LOCATION OF WORK SLUMP AT PLANT SLUMP AT SITE QUANTITY OPERATED BY
1 1/9/2019 48528 slab&beam -s02 180.00 140.00 6.5 AL AMIN HOSSAIN
2 1/9/2019 44833 slab&beam -s02 190.00 6.5 RUMEL AHMED
3 1/9/2019 48546 pier table p-42 180.00 100.00 5 SON
4 2/9/2019 41422 segment s-144/s8 70.00 4 ANUN TOOY
5 2/9/2019 44918 segment s-144/s8 140.00 4 MD.MIZANUR RAHMAN
6 6/9/2019 45432 segment s147/s7 125.00 4 AL AMIN HOSSAIN
7 7/9/2019 24619 pile cap p-375 130.00 5 MD SOHANUR RAHMAN
8 7/9/2019 45963 cable trough p-85 180.00 175.00 4 MD.MIZANUR RAHMAN
9 8/9/2019 45756 segnemt s-366/s10 85.00 4 ANUN TOOY
10 9/9/2019 45737 segnemt s-198/s9 80.00 4 MD.MIZANUR RAHMAN
11 11/9/2019 45865 segnemt s-123/s1 200.00 4 RUMEL AHMED
12 11/9/2019 46058 segment p138/s138 175.00 4 MD.MIZANUR RAHMAN
13 14/9/2019 45953 cable trough p-99 195.00 250.00 2 WORASAK PANYAWONG
14 15/9/2019 46019 floating col. S02/c6. 180.00 185.00 4 MASUD MIHA
15 15/9/2019 46032 floating col. S02/c6. 130.00 3 WORASAK PANYAWONG
16 15/9/2019 46025 segment s198/s11 130.00 4 TARIFUL ISLAM
17 16/9/2019 46067 parapet lock p96-p97 190.00 200.00 2.5 MASUD MIHA
18 16/9/2019 46073 parapet lock p96-p97 185.00 190.00 2.5 MASUD MIHA
19 18/9/2019 46162 segment s366/d1 230.00 4 AKSORN SRIYAWONG
20 18/9/2019 46164 segment s366/d1 220.00 4 AKSORN SRIYAWONG
21 19/9/2019 46196 parapet p-66 130.00 3.6 AKSORN SRIYAWONG
22 22/9/2019 46311 segment . 198/d1 135.00 4 MASUD MIHA
23 24/9/2019 46465 portal rise part p.32 230.00 3.5 WORASAK PANYAWONG
24 24/9/2019 46444 segment s146/d1 135.00 4 ANUN TOOY
25 25/9/2019 40656 cable trough p.87-88 215.00 5 WORASAK PANYAWONG
26 25/9/2019 46505 parapet p-66 235.00 4 TARIFUL ISLAM
27 26/9/2019 46547 column p-375 200.00 185.00 6.5 JAHIRUL ISLAM
28 26/9/2019 25166 column p-374 190.00 185.00 6 SHOHEL
29 26/9/2019 46537 segment s158/d2 225.00 4 AL AMIN HOSSAIN
TOTAL 121.60
REJECT PAPER OCTOBER 2019 :SLUMP AT PLANT & SLUMP AT SITE QUANTITY
ITEM DATE NO LOCATION OF WORK SLUMP AT PLANT SLUMP AT SITE QUANTITY OPERATED BY
1 9/10/2019 47077 SEGMENT .S329/S10 135.00 4 WORASAK PANYAWONG
2 14/10/2019 47245 SEGMENT PN353/S1 145.00 4 TARIFUL ISLAM
3 17/10/2019 47395 SEGMENT S153/S3 130.00 4 WORASAK PANYAWONG
4 18/10/2019 47456 2 CELL P36-P37 260.00 6.5 SAKYASHEEP DEEDERM
5 18/10/2019 47458 SEGMENT S124/S8 245.00 4 SAIFA RAKSAPHOL
6 19/10/2019 47501 SEGMENT S163/D2 170.00 4 RUNGARUN
7 19/10/2019 47504 SEGMENT S163/D2 90.00 4 WORASAK PANYAWONG
8 21/10/2019 47640 SEGMENT S164/S5 125.00 4 MD.MIZANUR RAHMAN
9 21/10/2019 47625 SEGMENT S329/D1 220.00 4 MD.MIZANUR RAHMAN
10 21/10/2019 47634 SEGMENT S329/D1 120.00 4.5 MD.MIZANUR RAHMAN
11 22/10/2019 43174 SINGLE COL S02/06/GL 220.00 4.5 WORASAK PANYAWONG
12 22/10/2019 43184 SEGMENT S169/S6 195.00 4 WORASAK PANYAWONG
13 22/10/2019 33465 SEGMENT S124/S13 115.00 2.5 TARIFUL ISLAM
14 24/10/2019 33498 SEGMENT S143/S1 180.00 4 MASUD MIHA
15 25/10/2019 47854 CAB. THR. SPAN P-61-62 190.00 210.00 5 AL AMIN HOSSAIN
16 27/10/2019 48032 PILE CAP P-132 20.00 4 AL AMIN HOSSAIN
17 28/10/2019 48171 SLAB S03/PART-2 180.00 6.5 RUMEL AHMED
18 28/10/2019 48185 SLAB S03/PART-2 200.00 220.00 6.5 WORASAK PANYAWONG
19 28/10/2019 48087 SEGMENT S115/S6 130.00 4 MASUD MIHA
20 29/10/2019 48204 SLAB S03/PART-2 185.00 6.5 AL AMIN HOSSAIN
21 29/10/2019 48316 SEGMENT .S122/S4 105.00 3 MD.MIZANUR RAHMAN
22 30/10/2019 48405 PIER-175(SB)ROAD 85.00 2 JAHIRUL ISLAM
TOTAL 95.5