UCY BP 01/01/2021

Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
01/01/2021 UCY BP-02 270646 CEMENT 4.44 24000 C3ML SUB
01/01/2021 UCY BP-02 270647 SAND 8.40 24000 C3ML SUB
01/01/2021 UCY BP-02 270648 STONE 10.34 24000 C3ML SUB
01/01/2021 UCY BP-02 270649 SIKA 204 44.40 24000 C3ML SUB
01/01/2021 UCY BP-02 270650 CEMENT 1.91 28002 SP-A SUP
01/01/2021 UCY BP-02 270651 SAND 6.69 28002 SP-A SUP
01/01/2021 UCY BP-02 270652 STONE 7.24 28002 SP-A SUP
01/01/2021 UCY BP-02 270653 SIKA 204 16.80 28002 SP-A SUP
Record BY Check by
Operator Plant Engineer

Check by
Engineer THAI
RECORDER
CEMENT 6.35 tons
SAND 15.09 tons
STONE 17.58 tons
SIKA 204 61.2 kg
SIKA 3006 ES 0.00 kg

UCY BP-01 UCY BP-02 total


CEMENT 0 6.35 6.35 tons
SAND 0 15.09 15.09 tons
STONE 0 17.58 17.58 tons
SIKA 204 0 61.2 61.2 kg
SIKA 3006 ES 0 0 0 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 0 0 0 tons
SAND 0 0 0 tons
STONE 0 0 0 tons
SIKA 204 0 0 0 kg
SIKA 3006 ES 0 0 0 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 0 0 0 tons
SAND 0 0 0 tons
STONE 0 0 0 tons
SIKA 204 0 0 0 kg
SIKA 3006 ES 0 0 0 kg

CP-03&04

UCY BP-01 UCY BP-02 total


CEMENT 0 6.35 6.35 tons
SAND 0 15.09 15.09 tons
STONE 0 17.58 17.58 tons
SIKA 204 0 61.2 61.2 kg
SIKA 3006 ES 0 0 0 kg
UCY BP 02/01/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
02/01/2021 UCY BP-01 270658 CEMENT 5.06 20103 TRAFFICM
02/01/2021 UCY BP-01 270659 SAND 9.36 20103 TRAFFICM
02/01/2021 UCY BP-01 270660 STONE 11.34 20103 TRAFFICM
02/01/2021 UCY BP-01 270661 SIKA 3006 ES 30.36 20103 TRAFFICM
02/01/2021 UCY BP-01 270662 CEMENT 9.80 31001 C3S2- ARC
02/01/2021 UCY BP-01 270663 SAND 24.30 31001 C3S2- ARC
02/01/2021 UCY BP-01 270664 STONE 30.32 31001 C3S2- ARC
02/01/2021 UCY BP-01 270665 SIKA 204 137.20 31001 C3S2- ARC
02/01/2021 UCY BP-01 270666 CEMENT 2.30 24000 C3ML-SUB
02/01/2021 UCY BP-01 270667 SAND 4.25 24000 C3ML-SUB
02/01/2021 UCY BP-01 270668 STONE 5.18 24000 C3ML-SUB
02/01/2021 UCY BP-01 270669 SIKA 204 23.00 24000 C3ML-SUB
02/01/2021 UCY BP-01 270670 CEMENT 5.27 28003 C3ML-SUB
02/01/2021 UCY BP-01 270671 SAND 11.05 28003 C3ML-SUB
02/01/2021 UCY BP-01 270672 STONE 12.49 28003 C3ML-SUB
02/01/2021 UCY BP-01 270673 SIKA 204 50.40 28003 C3ML-SUB
02/01/2021 UCY BP-02 270674 CEMENT 2.96 S4000 C3S2 S/J
02/01/2021 UCY BP-02 270675 SAND 6.36 S4000 C3S2 S/J
02/01/2021 UCY BP-02 270676 STONE 6.70 S4000 C3S2 S/J
02/01/2021 UCY BP-02 270677 SIKA 204 27.30 S4000 C3S2 S/J
02/01/2021 UCY BP-02 270678 CEMENT 1.05 33003 C3S1 -ARC
02/01/2021 UCY BP-02 270680 SAND 2.14 33003 C3S1 -ARC
02/01/2021 UCY BP-02 270680 STONE 2.58 33003 C3S1 -ARC
02/01/2021 UCY BP-02 270681 SIKA 204 10.50 33003 C3S1 -ARC
02/01/2021 UCY BP-02 270682 CEMENT 2.85 20103 TRAFFICM
02/01/2021 UCY BP-02 270683 SAND 5.28 20103 TRAFFICM
02/01/2021 UCY BP-02 270684 STONE 6.39 20103 TRAFFICM
02/01/2021 UCY BP-02 270685 SIKA 3006 ES 17.11 20103 TRAFFICM
02/01/2021 UCY BP-02 270686 CEMENT 1.01 28001 SP-A-SUP
02/01/2021 UCY BP-02 270687 SAND 1.87 28001 SP-A-SUP
02/01/2021 UCY BP-02 270688 STONE 2.27 28001 SP-A-SUP
02/01/2021 UCY BP-02 270689 SIKA 204 6.07 28001 SP-A-SUP
Record BY Check by
Operator Plant Engineer

Check by
Engineer THAI
RECORDER
CEMENT 30.3 tons
SAND 64.61 tons
STONE 77.27 tons
SIKA 204 254.47 kg
SIKA 3006 ES 47.47 kg

UCY BP-01 UCY BP-02 total


CEMENT 22.43 7.87 30.3 tons
SAND 48.96 15.65 64.61 tons
STONE 59.33 17.94 77.27 tons
SIKA 204 210.6 43.87 254.47 kg
SIKA 3006 ES 30.36 17.11 47.47 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 0 0 0 tons
SAND 0 0 0 tons
STONE 0 0 0 tons
SIKA 204 0 0 0 kg
SIKA 3006 ES 0 0 0 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 0 0 0 tons
SAND 0 0 0 tons
STONE 0 0 0 tons
SIKA 204 0 0 0 kg
SIKA 3006 ES 0 0 0 kg

CP-03&04

UCY BP-01 UCY BP-02 total


CEMENT 22.43 7.87 30.3 tons
SAND 48.96 15.65 64.61 tons
STONE 59.33 17.94 77.27 tons
SIKA 204 210.6 43.87 254.47 kg
SIKA 3006 ES 30.36 17.11 47.47 kg
UCY BP 03/01/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
03/01/2021 UCY BP-02 270214 CEMENT 5.13 31002 C3S3-ARC
03/01/2021 UCY BP-02 270215 SAND 12.99 31002 C3S3-ARC
03/01/2021 UCY BP-02 270216 STONE 15.19 31002 C3S3-ARC
03/01/2021 UCY BP-02 270217 SIKA 204 68.60 31002 C3S3-ARC
03/01/2021 UCY BP-02 270218 CEMENT 4.32 S4000 C3S4-SUB
03/01/2021 UCY BP-02 270219 SAND 8.33 S4000 C3S4-SUB
03/01/2021 UCY BP-02 270220 STONE 9.23 S4000 C3S4-SUB
03/01/2021 UCY BP-02 270221 SIKA 204 40.94 S4000 C3S4-SUB
03/01/2021 UCY BP-02 270222 CEMENT 1.84 26102 C3ML -SUB
03/01/2021 UCY BP-02 270223 SAND 3.38 26102 C3ML -SUB
03/01/2021 UCY BP-02 270224 STONE 4.14 26102 C3ML -SUB
03/01/2021 UCY BP-02 270225 SIKA 204 18.40 26102 C3ML -SUB
03/01/2021 UCY BP-02 270226 CEMENT 5.46 28003 C3ML -SUB
03/01/2021 UCY BP-02 270227 SAND 11.06 28003 C3ML -SUB
03/01/2021 UCY BP-02 270228 STONE 13.49 28003 C3ML -SUB
03/01/2021 UCY BP-02 270229 SIKA 204 54.60 28003 C3ML -SUB
03/01/2021 UCY BP-01 270230 CEMENT 1.24 28001
03/01/2021 UCY BP-01 270231 SAND 2.26 28001
03/01/2021 UCY BP-01 270232 STONE 2.79 28001
03/01/2021 UCY BP-01 270233 SIKA 204 7.45 28001
03/01/2021 UCY BP-01 270234 CEMENT 0.60 S4000
03/01/2021 UCY BP-01 270235 SAND 2.50 S4000
03/01/2021 UCY BP-01 270236 STONE 2.74 S4000
03/01/2021 UCY BP-01 270237 SIKA 204 5.98 S4000
03/01/2021 UCY BP-01 270238 CEMENT 0.84 33003 C3S2 -ARC
03/01/2021 UCY BP-01 270239 SAND 1.68 33003 C3S2 -ARC
03/01/2021 UCY BP-01 270240 STONE 2.06 33003 C3S2 -ARC
03/01/2021 UCY BP-01 270241 SIKA 204 8.40 33003 C3S2 -ARC
03/01/2021 UCY BP-01 270242 CEMENT 7.91 20103
03/01/2021 UCY BP-01 270243 SAND 14.41 20103
03/01/2021 UCY BP-01 270244 STONE 17.75 20103
03/01/2021 UCY BP-01 270245 SIKA 204 47.47 20103
03/01/2021 UCY BP-01 270246 CEMENT 6.73 28003 C3ML -SUB
03/01/2021 UCY BP-01 270247 SAND 13.85 28003 C3ML -SUB
03/01/2021 UCY BP-01 270247 STONE 16.00 28003 C3ML -SUB
03/01/2021 UCY BP-01 270249 SIKA 204 65.10 28003 C3ML -SUB
03/01/2021 UCY BP-01 270250 CEMENT 1.60 26102 C3ML -SUB
Record BY Check by
Operator Plant Engineer

Check by
Engineer THAI
RECORDER
CEMENT 35.67 tons
SAND 70.46 tons
STONE 83.39 tons
SIKA 204 316.94 kg
SIKA 3006 ES 0.00 kg

UCY BP-01 UCY BP-02 total


CEMENT 18.92 16.75 35.67 tons
SAND 34.7 35.76 70.46 tons
STONE 41.34 42.05 83.39 tons
SIKA 204 134.4 182.54 316.94 kg
SIKA 3006 ES 0 0 0 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 0 0 0 tons
SAND 0 0 0 tons
STONE 0 0 0 tons
SIKA 204 0 0 0 kg
SIKA 3006 ES 0 0 0 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 0 0 0 tons
SAND 0 0 0 tons
STONE 0 0 0 tons
SIKA 204 0 0 0 kg
SIKA 3006 ES 0 0 0 kg

CP-03&04

UCY BP-01 UCY BP-02 total


CEMENT 18.92 16.75 35.67 tons
SAND 34.7 35.76 70.46 tons
STONE 41.34 42.05 83.39 tons
SIKA 204 134.4 182.54 316.94 kg
SIKA 3006 ES 0 0 0 kg
UCY BP 04/01/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
04/01/2021 UCY BP-01 270250 CEMENT 1.60 26102 C3ML -SUB
04/01/2021 UCY BP-01 270250 SAND 2.94 26102 C3ML -SUB
04/01/2021 UCY BP-01 270252 STONE 3.61 26102 C3ML -SUB
04/01/2021 UCY BP-01 270253 SIKA 204 16.10 26102 C3ML -SUB
04/01/2021 UCY BP-01 270254 CEMENT 1.05 33003 C3S2-ARC
04/01/2021 UCY BP-01 270255 SAND 2.11 33003 C3S2-ARC
04/01/2021 UCY BP-01 270256 STONE 2.58 33003 C3S2-ARC
04/01/2021 UCY BP-01 270257 SIKA 204 10.50 33003 C3S2-ARC
04/01/2021 UCY BP-01 270258 CEMENT 0.63 33003 C3S3-ARC
04/01/2021 UCY BP-01 270259 SAND 1.27 33003 C3S3-ARC
04/01/2021 UCY BP-01 270260 STONE 1.55 33003 C3S3-ARC
04/01/2021 UCY BP-01 270261 SIKA 204 6.30 33003 C3S3-ARC
04/01/2021 UCY BP-01 270262 CEMENT 7.91 20103
04/01/2021 UCY BP-01 270263 SAND 14.16 20103
04/01/2021 UCY BP-01 270263 STONE 18.04 20103
04/01/2021 UCY BP-01 270265 SIKA 3006 ES 47.47 20103
04/01/2021 UCY BP-01 270266 CEMENT 0.63 33003 C3S1 ARC
04/01/2021 UCY BP-01 270267 SAND 1.27 33003 C3S1 ARC
04/01/2021 UCY BP-01 270268 STONE 1.55 33003 C3S1 ARC
04/01/2021 UCY BP-01 270269 SIKA 204 6.30 33003 C3S1 ARC
04/01/2021 UCY BP-01 270270 CEMENT 4.00 28003 C3ML -SUB
04/01/2021 UCY BP-01 270272 SAND 8.40 28003 C3ML -SUB
04/01/2021 UCY BP-01 270271 STONE 9.28 28003 C3ML -SUB
04/01/2021 UCY BP-01 270273 SIKA 204 37.80 28003 C3ML -SUB
04/01/2021 UCY BP-02 270274 CEMENT 1.24 28001 S/J
04/01/2021 UCY BP-02 270275 SAND 2.27 28001 S/J
04/01/2021 UCY BP-02 270276 STONE 2.78 28001 S/J
04/01/2021 UCY BP-02 270277 SIKA 204 7.45 28001 S/J
04/01/2021 UCY BP-02 270278 CEMENT 8.63 S4000 C3S2-SUB
04/01/2021 UCY BP-02 270279 SAND 17.80 S4000 C3S2-SUB
04/01/2021 UCY BP-02 270280 STONE 20.68 S4000 C3S2-SUB
04/01/2021 UCY BP-02 270281 SIKA 204 84.00 S4000 C3S2-SUB
04/01/2021 UCY BP-02 270282 CEMENT 0.46 28003 C3ML -SUB
04/01/2021 UCY BP-02 270283 SAND 1.60 28003 C3ML -SUB
04/01/2021 UCY BP-02 270284 CEMENT 6.51 28003
04/01/2021 UCY BP-02 270285 SAND 13.18 28003
04/01/2021 UCY BP-02 270286 STONE 16.03 28003
04/01/2021 UCY BP-02 270287 SIKA 204 65.10 28003
04/01/2021 UCY BP-02 270288 CEMENT 1.47 24000 C3ML -SUB
04/01/2021 UCY BP-02 270289 SAND 2.98 24000 C3ML -SUB
04/01/2021 UCY BP-02 270290 STONE 3.71 24000 C3ML -SUB
04/01/2021 UCY BP-02 270291 SIKA 204 14.70 24000 C3ML -SUB
04/01/2021 UCY BP-02 270292 CEMENT 5.46 28002
04/01/2021 UCY BP-02 270293 SAND 11.05 28002
04/01/2021 UCY BP-02 270294 STONE 13.44 28002
04/01/2021 UCY BP-02 270295 SIKA 204 54.60 28002
04/01/2021 UCY BP-02 270297 CEMENT 1.84 26101
04/01/2021 UCY BP-02 270298 SAND 3.38 26101
04/01/2021 UCY BP-02 270299 STONE 4.14 26101
04/01/2021 UCY BP-02 270300 SIKA 204 18.40 26101

Record BY Check by
Operator Plant Engineer

Check by
Engineer THAI
RECORDER
CEMENT 41.43 tons
SAND 82.41 tons
STONE 97.39 tons
SIKA 204 321.25 kg
SIKA 3006 ES 47.47 kg

UCY BP-01 UCY BP-02 total


CEMENT 15.82 25.61 41.43 tons
SAND 30.15 52.26 82.41 tons
STONE 36.61 60.78 97.39 tons
SIKA 204 77 244.25 321.25 kg
SIKA 3006 ES 47.47 0 47.47 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 0 0 0 tons
SAND 0 0 0 tons
STONE 0 0 0 tons
SIKA 204 0 0 0 kg
SIKA 3006 ES 0 0 0 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 0 0 0 tons
SAND 0 0 0 tons
STONE 0 0 0 tons
SIKA 204 0 0 0 kg
SIKA 3006 ES 0 0 0 kg

CP-03&04

UCY BP-01 UCY BP-02 total


CEMENT 15.82 25.61 41.43 tons
SAND 30.15 52.26 82.41 tons
STONE 36.61 60.78 97.39 tons
SIKA 204 77 244.25 321.25 kg
SIKA 3006 ES 47.47 0 47.47 kg
UCY BP 05/01/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
05/01/2021 UCY BP-01 270301 CEMENT 0.69 28001
05/01/2021 UCY BP-01 270302 SAND 1.26 28001
05/01/2021 UCY BP-01 270303 STONE 1.55 28001
05/01/2021 UCY BP-01 270304 SIKA 3006 ES 4.14 28001
05/01/2021 UCY BP-01 270305 CEMENT 0.22 S4000 C3S4 -SUB
05/01/2021 UCY BP-01 270306 SAND 0.80 S4000 C3S4 -SUB
05/01/2021 UCY BP-01 270307 CEMENT 0.25 S4000 C3S2 -SUB
05/01/2021 UCY BP-01 270308 SAND 0.78 S4000 C3S2 -SUB
05/01/2021 UCY BP-01 270309 SIKA 204 1.50 S4000 C3S2 -SUB
05/01/2021 UCY BP-01 270310 CEMENT 0.45 28003 C3ML-SUB
05/01/2021 UCY BP-01 270311 SAND 1.60 28003 C3ML-SUB
05/01/2021 UCY BP-01 270312 CEMENT 9.24 28002 C3ML-SUB
05/01/2021 UCY BP-01 270313 SAND 18.60 28002 C3ML-SUB
05/01/2021 UCY BP-01 270314 STONE 22.08 28002 C3ML-SUB
05/01/2021 UCY BP-01 270315 SIKA 204 92.40 28002 C3ML-SUB
05/01/2021 UCY BP-01 270316 CEMENT 3.94 28002 C3ML-SUB
05/01/2021 UCY BP-01 270317 SAND 5.92 28002 C3ML-SUB
05/01/2021 UCY BP-01 270318 STONE 7.26 28002 C3ML-SUB
05/01/2021 UCY BP-01 270319 SIKA 204 29.40 28002 C3ML-SUB
05/01/2021 UCY BP-02 270320 CEMENT 7.91 26101 S/J
05/01/2021 UCY BP-02 270321 SAND 14.41 26101 S/J
05/01/2021 UCY BP-02 270322 STONE 17.78 26101 S/J
05/01/2021 UCY BP-02 270323 SIKA 204 47.47 26101 S/J
05/01/2021 UCY BP-02 270324 CEMENT 4.01 28003 C3ML S/J
05/01/2021 UCY BP-02 270325 SAND 8.38 28003 C3ML S/J
05/01/2021 UCY BP-02 270326 STONE 9.31 28003 C3ML S/J
05/01/2021 UCY BP-02 270327 SIKA 204 37.80 28003 C3ML S/J
Record BY Check by
Operator Plant Engineer

Check by
Engineer THAI
RECORDER
CEMENT 26.26 tons
SAND 51.75 tons
STONE 57.98 tons
SIKA 204 208.57 kg
SIKA 3006 ES 4.14 kg

UCY BP-01 UCY BP-02 total


CEMENT 14.34 11.92 26.26 tons
SAND 28.96 22.79 51.75 tons
STONE 30.89 27.09 57.98 tons
SIKA 204 123.3 85.27 208.57 kg
SIKA 3006 ES 4.14 0 4.14 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 0 0 0 tons
SAND 0 0 0 tons
STONE 0 0 0 tons
SIKA 204 0 0 0 kg
SIKA 3006 ES 0 0 0 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 0 0 0 tons
SAND 0 0 0 tons
STONE 0 0 0 tons
SIKA 204 0 0 0 kg
SIKA 3006 ES 0 0 0 kg

CP-03&04

UCY BP-01 UCY BP-02 total


CEMENT 14.34 11.92 26.26 tons
SAND 28.96 22.79 51.75 tons
STONE 30.89 27.09 57.98 tons
SIKA 204 123.3 85.27 208.57 kg
SIKA 3006 ES 4.14 0 4.14 kg
CP-0602
CP-07
UCY BP 06/01/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
06/01/2021 UCY BP-01 270358 CEMENT 1.09 S4000 C3S4 - SUB
06/01/2021 UCY BP-01 270359 SAND 2.46 S4000 C3S4 - SUB
06/01/2021 UCY BP-01 270360 STONE 2.06 S4000 C3S4 - SUB
06/01/2021 UCY BP-01 270361 SIKA 204 9.90 S4000 C3S4 - SUB
06/01/2021 UCY BP-01 270364 CEMENT 1.38 S4000 C3S2 -SUB
06/01/2021 UCY BP-01 270365 SAND 2.58 S4000 C3S2 -SUB
06/01/2021 UCY BP-01 270366 STONE 3.11 S4000 C3S2 -SUB
06/01/2021 UCY BP-01 270367 SIKA 204 13.80 S4000 C3S2 -SUB
06/01/2021 UCY BP-01 270368 CEMENT 1.26 28003 C3ML-SUB
06/01/2021 UCY BP-01 270369 SAND 2.53 28003 C3ML-SUB
06/01/2021 UCY BP-01 270370 STONE 3.11 28003 C3ML-SUB
06/01/2021 UCY BP-01 270371 SIKA 204 12.60 28003 C3ML-SUB
06/01/2021 UCY BP-01 270372 CEMENT 0.46 28006 C3ML -SUB
06/01/2021 UCY BP-01 270373 SAND 0.85 28006 C3ML -SUB
06/01/2021 UCY BP-01 270374 STONE 1.03 28006 C3ML -SUB
06/01/2021 UCY BP-01 270375 SIKA 204 4.60 28006 C3ML -SUB
06/01/2021 UCY BP-02 270376 CEMENT 1.23 26300 C3ML -SUB
06/01/2021 UCY BP-02 270377 SAND 1.93 26300 C3ML -SUB
06/01/2021 UCY BP-02 270378 STONE 2.56 26300 C3ML -SUB
06/01/2021 UCY BP-02 270379 SIKA 204 14.70 26300 C3ML -SUB
06/01/2021 UCY BP-02 270380 CEMENT 7.91 20103 S/J
06/01/2021 UCY BP-02 270381 SAND 14.41 20103 S/J
06/01/2021 UCY BP-02 270382 STONE 17.75 20103 S/J
06/01/2021 UCY BP-02 270383 SIKA 204 47.47 20103 S/J
06/01/2021 UCY BP-02 270384 CEMENT 6.79 28003 C3ML-SUB
06/01/2021 UCY BP-02 270385 SAND 14.33 28003 C3ML-SUB
06/01/2021 UCY BP-02 270386 STONE 15.53 28003 C3ML-SUB
06/01/2021 UCY BP-02 270387 SIKA 204 63.00 28003 C3ML-SUB
06/01/2021 UCY BP-02 270388 CEMENT 0.71 S4000 C3S1 -SUB
06/01/2021 UCY BP-02 270389 SAND 1.44 S4000 C3S1 -SUB
06/01/2021 UCY BP-02 270390 STONE 1.76 S4000 C3S1 -SUB
06/01/2021 UCY BP-02 270391 SIKA 204 7.14 S4000 C3S1 -SUB

06/01/2021 UCY BP-01 - CEMENT 13.94 CP-07


06/01/2021 UCY BP-01 - SAND 28.05 CP-07
06/01/2021 UCY BP-01 - STONE 35.29 CP-07
06/01/2021 UCY BP-01 - SIKA 204 153.34 CP-07
06/01/2021 UCY BP-01 - CEMENT 54.88 CP-0602
06/01/2021 UCY BP-01 - SAND 98.36 CP-0602
06/01/2021 UCY BP-01 - STONE 125.70 CP-0602
06/01/2021 UCY BP-01 - SIKA 3006 ES 328.38 CP-0602
06/01/2021 UCY BP-02 - CEMENT 12.92 CP-07
06/01/2021 UCY BP-02 - SAND 26.05 CP-07
06/01/2021 UCY BP-02 - STONE 32.79 CP-07
06/01/2021 UCY BP-02 - SIKA 204 142.07 CP-07

Record BY Check by
Operator Plant Engineer

Check by
Engineer THAI
RECORDER
CEMENT 102.57 tons
SAND 192.99 tons
STONE 240.69 tons
SIKA 204 468.62 kg
SIKA 3006 ES 328.38 kg

UCY BP-01 UCY BP-02 total


CEMENT 73.01 29.56 102.57 tons
SAND 134.83 58.16 192.99 tons
STONE 170.3 70.39 240.69 tons
SIKA 204 194.24 274.38 468.62 kg
SIKA 3006 ES 328.38 0 328.38 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 54.88 0 54.88 tons
SAND 98.36 0 98.36 tons
STONE 125.7 0 125.7 tons
SIKA 204 0 0 0 kg
SIKA 3006 ES 328.38 0 328.38 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 13.94 12.92 26.86 tons
SAND 28.05 26.05 54.1 tons
STONE 35.29 32.79 68.08 tons
SIKA 204 153.34 142.07 295.41 kg
SIKA 3006 ES 0 0 0 kg

CP-03&04

UCY BP-01 UCY BP-02 total


CEMENT 4.19 16.64 20.83 tons
SAND 8.42 32.11 40.53 tons
STONE 9.31 37.6 46.91 tons
SIKA 204 40.9 132.31 173.21 kg
SIKA 3006 ES 0 0 0 kg
CP-0602
CP-07
UCY BP 07/01/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
07/01/2021 UCY BP-01 270501 CEMENT 7.91 20103
07/01/2021 UCY BP-01 270502 SAND 14.38 20103
07/01/2021 UCY BP-01 270503 STONE 17.78 20103
07/01/2021 UCY BP-01 270504 SIKA 3006 ES 47.47 20103
07/01/2021 UCY BP-01 270505 CEMENT 2.30 28001
07/01/2021 UCY BP-01 270506 SAND 4.18 28001
07/01/2021 UCY BP-01 270507 STONE 5.17 28001
07/01/2021 UCY BP-01 270508 SIKA 3006 ES 13.80 28001
07/01/2021 UCY BP-01 270509 CEMENT 65.75 S4000 C3S1 -SUB
07/01/2021 UCY BP-01 270510 SAND 130.59 S4000 C3S1 -SUB
07/01/2021 UCY BP-01 270511 STONE 160.84 S4000 C3S1 -SUB
07/01/2021 UCY BP-01 270512 SIKA 204 655.20 S4000 C3S1 -SUB
07/01/2021 UCY BP-01 270513 CEMENT 32.99 S4000 C3S4 -SUB
07/01/2021 UCY BP-01 270514 SAND 65.70 S4000 C3S4 -SUB
07/01/2021 UCY BP-01 270515 STONE 80.42 S4000 C3S4 -SUB
07/01/2021 UCY BP-01 270516 SIKA 204 327.60 S4000 C3S4 -SUB
07/01/2021 UCY BP-02 270517 CEMENT 97.31 S4000 C3S4 -SUB
07/01/2021 UCY BP-02 270518 SAND 193.37 S4000 C3S4 -SUB
07/01/2021 UCY BP-02 270519 STONE 236.64 S4000 C3S4 -SUB
07/01/2021 UCY BP-02 270520 SIKA 204 966.30 S4000 C3S4 -SUB
07/01/2021 UCY BP-02 270521 CEMENT 9.79 28003
07/01/2021 UCY BP-02 270522 SAND 15.78 28003
07/01/2021 UCY BP-02 270523 STONE 18.56 28003
07/01/2021 UCY BP-02 270524 SIKA 204 75.60 28003
07/01/2021 UCY BP-02 270525 CEMENT 0.42 33003 C3S2-ARC
07/01/2021 UCY BP-02 270526 SAND 0.83 33003 C3S2-ARC
07/01/2021 UCY BP-02 270527 STONE 1.03 33003 C3S2-ARC
07/01/2021 UCY BP-02 270528 SIKA 204 4.20 33003 C3S2-ARC
07/01/2021 UCY BP-02 270529 CEMENT 1.26 33003 C3S3-ARC
07/01/2021 UCY BP-02 270530 SAND 2.51 33003 C3S3-ARC
07/01/2021 UCY BP-02 270531 STONE 3.09 33003 C3S3-ARC
07/01/2021 UCY BP-02 270532 SIKA 204 12.60 33003 C3S3-ARC
07/01/2021 UCY BP-02 270533 CEMENT 24.57 S4000 C3S1 -SUB
07/01/2021 UCY BP-02 270534 SAND 48.67 S4000 C3S1 -SUB
07/01/2021 UCY BP-02 270535 STONE 60.31 S4000 C3S1 -SUB
07/01/2021 UCY BP-02 270536 SIKA 204 245.70 S4000 C3S1 -SUB

07/01/2021 UCY BP-01 - CEMENT 22.77 CP-0602


07/01/2021 UCY BP-01 - SAND 40.69 CP-0602
07/01/2021 UCY BP-01 - STONE 51.92 CP-0602
07/01/2021 UCY BP-01 - SIKA 3006 ES 136.62 CP-0602
07/01/2021 UCY BP-02 - CEMENT 3.98 CP-0602
07/01/2021 UCY BP-02 - SAND 8.12 CP-0602
07/01/2021 UCY BP-02 - STONE 10.29 CP-0602
07/01/2021 UCY BP-02 - SIKA 3006 ES 20.52 CP-0602
07/01/2021 UCY BP-02 - CEMENT 3.28 CP-07
07/01/2021 UCY BP-02 - SAND 6.56 CP-07
07/01/2021 UCY BP-02 - STONE 8.31 CP-07
07/01/2021 UCY BP-02 - SIKA 204 36.08 CP-07

Record BY Check by
Operator Plant Engineer

Check by
Engineer THAI
RECORDER
CEMENT 272.33 tons
SAND 531.38 tons
STONE 654.36 tons
SIKA 204 2323.28 kg
SIKA 3006 ES 218.41 kg

UCY BP-01 UCY BP-02 total


CEMENT 131.72 140.61 272.33 tons
SAND 255.54 275.84 531.38 tons
STONE 316.13 338.23 654.36 tons
SIKA 204 982.8 1340.48 2323.28 kg
SIKA 3006 ES 197.89 20.52 218.41 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 22.77 3.98 26.75 tons
SAND 40.69 8.12 48.81 tons
STONE 51.92 10.29 62.21 tons
SIKA 204 0 0 0 kg
SIKA 3006 ES 136.62 20.52 157.14 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 0 3.28 3.28 tons
SAND 0 6.56 6.56 tons
STONE 0 8.31 8.31 tons
SIKA 204 0 36.08 36.08 kg
SIKA 3006 ES 0 0 0 kg

CP-03&04

UCY BP-01 UCY BP-02 total


CEMENT 108.95 133.35 242.3 tons
SAND 214.85 261.16 476.01 tons
STONE 264.21 319.63 583.84 tons
SIKA 204 982.8 1304.4 2287.2 kg
SIKA 3006 ES 61.27 0 61.27 kg
CP-0602
CP-07
UCY BP 08/01/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
08/01/2021 UCY BP-01 270537 CEMENT 2.30 28001
08/01/2021 UCY BP-01 270538 SAND 4.16 28001
08/01/2021 UCY BP-01 270539 STONE 5.17 28001
08/01/2021 UCY BP-01 270540 SIKA 3006 ES 13.80 28001
08/01/2021 UCY BP-01 270541 CEMENT 0.46 28006 C3ML-SUB
08/01/2021 UCY BP-01 270542 SAND 0.83 28006 C3ML-SUB
08/01/2021 UCY BP-01 270543 STONE 1.03 28006 C3ML-SUB
08/01/2021 UCY BP-01 270544 SIKA 3006 ES 4.60 28006 C3ML-SUB
08/01/2021 UCY BP-01 270545 CEMENT 97.23 S4000 C3S4-SUB
08/01/2021 UCY BP-01 270546 SAND 195.37 S4000 C3S4-SUB
08/01/2021 UCY BP-01 270547 STONE 239.14 S4000 C3S4-SUB
08/01/2021 UCY BP-01 270548 SIKA 204 972.30 S4000 C3S4-SUB
08/01/2021 UCY BP-01 270549 CEMENT 5.88 28003 C3ML -SUB
08/01/2021 UCY BP-01 270550 SAND 11.82 28003 C3ML -SUB
08/01/2021 UCY BP-01 270551 STONE 14.46 28003 C3ML -SUB
08/01/2021 UCY BP-01 270552 SIKA 204 58.80 28003 C3ML -SUB
08/01/2021 UCY BP-02 270553 CEMENT 78.58 S4000 C3S4-SUB
08/01/2021 UCY BP-02 270554 SAND 157.83 S4000 C3S4-SUB
08/01/2021 UCY BP-02 270555 STONE 193.17 S4000 C3S4-SUB
08/01/2021 UCY BP-02 270556 SIKA 204 785.40 S4000 C3S4-SUB
08/01/2021 UCY BP-02 270557 CEMENT 8.86 28003 S/J
08/01/2021 UCY BP-02 270558 SAND 18.47 28003 S/J
08/01/2021 UCY BP-02 270559 STONE 20.67 28003 S/J
08/01/2021 UCY BP-02 270560 SIKA 204 84.00 28003 S/J

08/01/2021 UCY BP-01 - CEMENT 39.10 CP-0602


08/01/2021 UCY BP-01 - SAND 69.70 CP-0602
08/01/2021 UCY BP-01 - STONE 89.68 CP-0602
08/01/2021 UCY BP-01 - SIKA 3006 ES 234.60 CP-0602
08/01/2021 UCY BP-02 - CEMENT 34.69 CP-0602
08/01/2021 UCY BP-02 - SAND 62.65 CP-0602
08/01/2021 UCY BP-02 - STONE 80.41 CP-0602
08/01/2021 UCY BP-02 - SIKA 3006 ES 204.06 CP-0602
Record BY Check by
Operator Plant Engineer

Check by
Engineer THAI
RECORDER
CEMENT 267.1 tons
SAND 520.83 tons
STONE 643.73 tons
SIKA 204 1900.5 kg
SIKA 3006 ES 457.06 kg

UCY BP-01 UCY BP-02 total


CEMENT 144.97 122.13 267.1 tons
SAND 281.88 238.95 520.83 tons
STONE 349.48 294.25 643.73 tons
SIKA 204 1031.1 869.4 1900.5 kg
SIKA 3006 ES 253 204.06 457.06 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 39.1 34.69 73.79 tons
SAND 69.7 62.65 132.35 tons
STONE 89.68 80.41 170.09 tons
SIKA 204 0 0 0 kg
SIKA 3006 ES 234.6 204.06 438.66 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 0 0 0 tons
SAND 0 0 0 tons
STONE 0 0 0 tons
SIKA 204 0 0 0 kg
SIKA 3006 ES 0 0 0 kg

CP-03&04

UCY BP-01 UCY BP-02 total


CEMENT 105.87 87.44 193.31 tons
SAND 212.18 176.3 388.48 tons
STONE 259.8 213.84 473.64 tons
SIKA 204 1031.1 869.4 1900.5 kg
SIKA 3006 ES 18.4 0 18.4 kg
CP-0602
CP-07
UCY BP 09/01/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
09/01/2021 UCY BP-01 270561 CEMENT 9.26 28003 C3ML-SUB
09/01/2021 UCY BP-01 270562 SAND 18.99 28003 C3ML-SUB
09/01/2021 UCY BP-01 270563 STONE 22.19 28003 C3ML-SUB
09/01/2021 UCY BP-01 270564 SIKA 3006 ES 90.30 28003 C3ML-SUB
09/01/2021 UCY BP-01 270565 CEMENT 1.15 28001
09/01/2021 UCY BP-01 270566 SAND 2.08 28001
09/01/2021 UCY BP-01 270567 STONE 2.58 28001
09/01/2021 UCY BP-01 270568 SIKA 3006 ES 6.90 28001
09/01/2021 UCY BP-01 270569 CEMENT 0.92 28006 C3ML-SUB
09/01/2021 UCY BP-01 270570 SAND 1.68 28006 C3ML-SUB
09/01/2021 UCY BP-01 270571 STONE 2.07 28006 C3ML-SUB
09/01/2021 UCY BP-01 270572 SIKA 204 9.20 28006 C3ML-SUB
09/01/2021 UCY BP-01 270573 CEMENT 5.98 26200 C3ML-SUB
09/01/2021 UCY BP-01 270574 SAND 10.92 26200 C3ML-SUB
09/01/2021 UCY BP-01 270575 STONE 13.48 26200 C3ML-SUB
09/01/2021 UCY BP-01 270576 SIKA 204 59.80 26200 C3ML-SUB
09/01/2021 UCY BP-02 270577 CEMENT 7.91 20103 S/J
09/01/2021 UCY BP-02 270578 SAND 14.48 20103 S/J
09/01/2021 UCY BP-02 270579 STONE 17.75 20103 S/J
09/01/2021 UCY BP-02 270580 SIKA 3006 ES 47.47 20103 S/J
09/01/2021 UCY BP-02 270581 CEMENT 2.30 28001 S/J
09/01/2021 UCY BP-02 270582 SAND 4.21 28001 S/J
09/01/2021 UCY BP-02 270583 STONE 5.16 28001 S/J
09/01/2021 UCY BP-02 270584 SIKA 3006 ES 13.80 28002 S/J
09/01/2021 UCY BP-02 270585 CEMENT 3.38 33003 C3S3 -ARC
09/01/2021 UCY BP-02 270586 SAND 8.61 33003 C3S3 -ARC
09/01/2021 UCY BP-01 270587 STONE 9.77 33003 C3S3 -ARC
09/01/2021 UCY BP-01 270588 SIKA 204 44.10 33003 C3S3 -ARC
09/01/2021 UCY BP-01 270589 CEMENT 3.15 S4000 C3S3-S/J
09/01/2021 UCY BP-02 270590 SAND 6.33 S4000 C3S3-S/J
09/01/2021 UCY BP-02 270591 STONE 7.78 S4000 C3S3-S/J
09/01/2021 UCY BP-02 270592 SIKA 204 31.50 S4000 C3S3-S/J
09/01/2021 UCY BP-02 270593 CEMENT 1.89 28002 C3ML-S/J
09/01/2021 UCY BP-02 270594 SAND 3.81 28002 C3ML-S/J
09/01/2021 UCY BP-02 270595 STONE 4.67 28002 C3ML-S/J
09/01/2021 UCY BP-02 270596 SIKA 204 18.90 28002 C3ML-S/J
09/01/2021 UCY BP-02 270597 CEMENT 1.38 S4000 C3S2-S/J
09/01/2021 UCY BP-02 270598 SAND 2.52 S4000 C3S2-S/J
09/01/2021 UCY BP-02 270599 STONE 3.11 S4000 C3S2-S/J
09/01/2021 UCY BP-02 270600 SIKA 204 13.80 S4000 C3S2-S/J
09/01/2021 UCY BP-02 270401 CEMENT 14.72 26200 C3ML-SUB
09/01/2021 UCY BP-02 270402 SAND 26.88 26200 C3ML-SUB
09/01/2021 UCY BP-02 270403 STONE 33.18 26200 C3ML-SUB
09/01/2021 UCY BP-02 270404 SIKA 204 147.20 26200 C3ML-SUB

09/01/2021 UCY BP-01 - CEMENT 37.44 CP-0602


09/01/2021 UCY BP-01 - SAND 67.77 CP-0602
09/01/2021 UCY BP-01 - STONE 86.18 CP-0602
09/01/2021 UCY BP-01 - SIKA 3006 ES 220.92 CP-0602
09/01/2021 UCY BP-01 - CEMENT 6.77 CP-07
09/01/2021 UCY BP-01 - SAND 13.56 CP-07
09/01/2021 UCY BP-01 - STONE 17.13 CP-07
09/01/2021 UCY BP-01 - SIKA 204 74.41 CP-07
09/01/2021 UCY BP-02 - CEMENT 1.38 CP-0602
09/01/2021 UCY BP-02 - SAND 2.46 CP-0602
09/01/2021 UCY BP-02 - STONE 3.17 CP-0602
09/01/2021 UCY BP-02 - SIKA 3006 ES 8.28 CP-0602
09/01/2021 UCY BP-02 - CEMENT 17.84 CP-07
09/01/2021 UCY BP-02 - SAND 36.19 CP-07
09/01/2021 UCY BP-02 - STONE 45.54 CP-07
09/01/2021 UCY BP-02 - SIKA 204 196.19 CP-07

Record BY Check by
Operator Plant Engineer

Check by
Engineer THAI
RECORDER
CEMENT 115.47 tons
SAND 220.49 tons
STONE 273.76 tons
SIKA 204 595.1 kg
SIKA 3006 ES 387.67 kg

UCY BP-01 UCY BP-02 total


CEMENT 64.67 50.8 115.47 tons
SAND 115 105.49 220.49 tons
STONE 153.4 120.36 273.76 tons
SIKA 204 187.51 407.59 595.1 kg
SIKA 3006 ES 318.12 69.55 387.67 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 37.44 1.38 38.82 tons
SAND 67.77 2.46 70.23 tons
STONE 86.18 3.17 89.35 tons
SIKA 204 0 0 0 kg
SIKA 3006 ES 220.92 8.28 229.2 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 6.77 17.84 24.61 tons
SAND 13.56 36.19 49.75 tons
STONE 17.13 45.54 62.67 tons
SIKA 204 74.41 196.19 270.6 kg
SIKA 3006 ES 0 0 0 kg

CP-03&04

UCY BP-01 UCY BP-02 total


CEMENT 20.46 31.58 52.04 tons
SAND 33.67 66.84 100.51 tons
STONE 50.09 71.65 121.74 tons
SIKA 204 113.1 211.4 324.5 kg
SIKA 3006 ES 97.2 61.27 158.47 kg
CP-0602
CP-07
UCY BP 10/01/2021
Summary RQ
DATE Plant RQ NO Material QTY
10/01/2021 UCY BP-01 270453 CEMENT 0.44
10/01/2021 UCY BP-01 270454 SAND 1.23
10/01/2021 UCY BP-01 270455 STONE 0.52
10/01/2021 UCY BP-01 270456 SIKA 204 2.10
10/01/2021 UCY BP-01 270457 CEMENT 3.17
10/01/2021 UCY BP-01 270458 SAND 6.75
10/01/2021 UCY BP-01 270459 STONE 7.24
10/01/2021 UCY BP-01 270460 SIKA 204 29.40
10/01/2021 UCY BP-01 270461 CEMENT 4.55
10/01/2021 UCY BP-01 270462 SAND 11.30
10/01/2021 UCY BP-01 270463 STONE 14.09
10/01/2021 UCY BP-01 270464 SIKA 204 63.70
10/01/2021 UCY BP-01 270465 SIKA-LATEX POWER 91.00
10/01/2021 UCY BP-01 270466 CEMENT 0.84
10/01/2021 UCY BP-01 270467 SAND 1.70
10/01/2021 UCY BP-01 270468 STONE 2.06
10/01/2021 UCY BP-01 270469 SIKA 204 8.40
10/01/2021 UCY BP-01 270470 CEMENT 0.84
10/01/2021 UCY BP-01 270471 SAND 1.70
10/01/2021 UCY BP-01 270472 STONE 2.06
10/01/2021 UCY BP-01 270473 SIKA 204 8.40
10/01/2021 UCY BP-01 270474 CEMENT 1.47
10/01/2021 UCY BP-01 270475 SAND 2.98
10/01/2021 UCY BP-01 270476 STONE 3.62
10/01/2021 UCY BP-01 270477 SIKA 204 14.70
10/01/2021 UCY BP-02 270478 CEMENT 1.84
10/01/2021 UCY BP-02 270479 SAND 3.38
10/01/2021 UCY BP-02 270480 STONE 4.14
10/01/2021 UCY BP-02 270481 SIKA 3006 ES 11.04
10/01/2021 UCY BP-02 270482 CEMENT 7.91
10/01/2021 UCY BP-02 270483 SAND 14.53
10/01/2021 UCY BP-02 270484 STONE 17.78
10/01/2021 UCY BP-02 270485 SIKA 3006 ES 47.47
10/01/2021 UCY BP-02 270486 CEMENT 0.46
10/01/2021 UCY BP-02 270487 SAND 0.84
10/01/2021 UCY BP-02 270488 STONE 1.03
10/01/2021 UCY BP-02 270489 SIKA 204 4.60
10/01/2021 UCY BP-02 270490 CEMENT 9.90
10/01/2021 UCY BP-02 270491 SAND 20.67
10/01/2021 UCY BP-02 270492 STONE 23.36
10/01/2021 UCY BP-02 270493 SIKA 204 94.50
10/01/2021 UCY BP-01 - CEMENT 53.13
10/01/2021 UCY BP-01 - SAND 94.94
10/01/2021 UCY BP-01 - STONE 121.39
10/01/2021 UCY BP-01 - SIKA 3006 ES 318.78
10/01/2021 UCY BP-02 - CEMENT 4.10
10/01/2021 UCY BP-02 - SAND 8.07
10/01/2021 UCY BP-02 - STONE 10.22
10/01/2021 UCY BP-02 - SIKA 3006 ES 20.52
10/01/2021 UCY BP-02 - CEMENT 10.86
10/01/2021 UCY BP-02 - SAND 22.15
10/01/2021 UCY BP-02 - STONE 27.69
10/01/2021 UCY BP-02 - SIKA 204 119.51

Record BY
Operator
1
SUBJOB RECORDER
S4000 C3S2-SUB CEMENT 99.51 tons
S4000 C3S2-SUB SAND 190.24 tons
S4000 C3S2-SUB STONE 235.2 tons
S4000 C3S2-SUB SIKA 204 345.31 kg
28003 C3ML-SUB SIKA 3006 ES 397.81 kg
28003 C3ML-SUB SIKA-LATEX POWER 91.00 kg
28003 C3ML-SUB
28003 C3ML-SUB
31002 C3S2-ARC UCY BP-01 UCY BP-02
31002 C3S2-ARC CEMENT 64.44 35.07
31002 C3S2-ARC SAND 120.6 69.64
31002 C3S2-ARC STONE 150.98 84.22
31002 C3S2-ARC SIKA 204 126.7 218.61
33003 C3S4-ARC SIKA 3006 ES 318.78 79.03
33003 C3S4-ARC SIKA-LATEX POWER 91 0
33003 C3S4-ARC
33003 C3S4-ARC
33003 C3S3-ARC
33003 C3S3-ARC CP-0602
33003 C3S3-ARC
33003 C3S3-ARC UCY BP-01 UCY BP-02
33003 C3S1 ARC CEMENT 53.13 4.1
33003 C3S1 ARC SAND 94.94 8.07
33003 C3S1 ARC STONE 121.39 10.22
33003 C3S1 ARC SIKA 204 0 0
28001 SIKA 3006 ES 318.78 20.52
28001 SIKA-LATEX POWER 0 0
28001
28001
20103
20103 CP-07
20103
20103 UCY BP-01 UCY BP-02
28006 C3ML-SUB CEMENT 0 10.86
28006 C3ML-SUB SAND 0 22.15
28006 C3ML-SUB STONE 0 27.69
28006 C3ML-SUB SIKA 204 0 119.51
28003 C3ML-SUB SIKA 3006 ES 0 0
28003 C3ML-SUB SIKA-LATEX POWER 0 0
28003 C3ML-SUB
28003 C3ML-SUB
CP-0602
CP-0602 CP-03&04
CP-0602
CP-0602 UCY BP-01 UCY BP-02
CP-0602 CEMENT 11.31 20.11
CP-0602 SAND 25.66 39.42
CP-0602 STONE 29.59 46.31
CP-0602 SIKA 204 126.7 99.1
CP-07 SIKA 3006 ES 0 58.51
CP-07 SIKA-LATEX POWER 91 0
CP-07
CP-07

Check by
Plant Engineer

Check by
Engineer THAI
total
99.51 tons
190.24 tons
235.2 tons
345.31 kg
397.81 kg
91 kg

total
57.23 tons
103.01 tons
131.61 tons
0 kg
339.3 kg
0 kg

total
10.86 tons
22.15 tons
27.69 tons
119.51 kg
0 kg
0 kg
total
31.42 tons
65.08 tons
75.9 tons
225.8 kg
58.51 kg
91 kg
CP-0602
CP-07
UCY BP 11/01/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
11/01/2021 UCY BP-01 270405 CEMENT 7.91 20103
11/01/2021 UCY BP-01 270406 SAND 14.05 20103
11/01/2021 UCY BP-01 270407 STONE 18.18 20103
11/01/2021 UCY BP-01 270408 SIKA 3006 ES 47.47 20103
11/01/2021 UCY BP-01 270409 CEMENT 16.63 28003 C3ML-SUB
11/01/2021 UCY BP-01 270410 SAND 34.62 28003 C3ML-SUB
11/01/2021 UCY BP-01 270411 STONE 39.25 28003 C3ML-SUB
11/01/2021 UCY BP-01 270412 SIKA 204 159.60 28003 C3ML-SUB
11/01/2021 UCY BP-02 270413 CEMENT 10.51 28003 C3ML-SUB
11/01/2021 UCY BP-02 270414 SAND 21.58 28003 C3ML-SUB
11/01/2021 UCY BP-02 270415 STONE 25.33 28003 C3ML-SUB
11/01/2021 UCY BP-02 270416 SIKA 204 103.00 28003 C3ML-SUB
11/01/2021 UCY BP-02 270417 CEMENT 1.38 26100 C3ML-SUB
11/01/2021 UCY BP-02 270418 SAND 2.53 26100 C3ML-SUB
11/01/2021 UCY BP-02 270419 STONE 3.10 26100 C3ML-SUB
11/01/2021 UCY BP-02 270420 SIKA 204 13.80 26100 C3ML-SUB

11/01/2021 UCY BP-01 - CEMENT 38.37 CP-0602


11/01/2021 UCY BP-01 - SAND 68.92 CP-0602
11/01/2021 UCY BP-01 - STONE 89.00 CP-0602
11/01/2021 UCY BP-01 - SIKA 3006 ES 226.14 CP-0602
11/01/2021 UCY BP-01 - CEMENT 1.23 CP-07
11/01/2021 UCY BP-01 - SAND 2.47 CP-07
11/01/2021 UCY BP-01 - STONE 3.12 CP-07
11/01/2021 UCY BP-01 - SIKA 204 13.53 CP-07
11/01/2021 UCY BP-02 - CEMENT 7.59 CP-0602
11/01/2021 UCY BP-02 - SAND 13.48 CP-0602
11/01/2021 UCY BP-02 - STONE 17.44 CP-0602
11/01/2021 UCY BP-02 - SIKA 3006 ES 45.54 CP-0602
11/01/2021 UCY BP-02 - CEMENT 6.76 CP-07
11/01/2021 UCY BP-02 - SAND 13.78 CP-07
11/01/2021 UCY BP-02 - STONE 17.21 CP-07
11/01/2021 UCY BP-02 - SIKA 204 74.41 CP-07
Record BY Check by
Operator Plant Engineer

Check by
Engineer THAI
RECORDER
CEMENT 90.38 tons
SAND 171.43 tons
STONE 212.63 tons
SIKA 204 364.34 kg
SIKA 3006 ES 319.15 kg

UCY BP-01 UCY BP-02 total


CEMENT 64.14 26.24 90.38 tons
SAND 120.06 51.37 171.43 tons
STONE 149.55 63.08 212.63 tons
SIKA 204 173.13 191.21 364.34 kg
SIKA 3006 ES 273.61 45.54 319.15 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 38.37 7.59 45.96 tons
SAND 68.92 13.48 82.4 tons
STONE 89 17.44 106.44 tons
SIKA 204 0 0 0 kg
SIKA 3006 ES 226.14 45.54 271.68 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 1.23 6.76 7.99 tons
SAND 2.47 13.78 16.25 tons
STONE 3.12 17.21 20.33 tons
SIKA 204 13.53 74.41 87.94 kg
SIKA 3006 ES 0 0 0 kg

CP-03&04

UCY BP-01 UCY BP-02 total


CEMENT 24.54 11.89 36.43 tons
SAND 48.67 24.11 72.78 tons
STONE 57.43 28.43 85.86 tons
SIKA 204 159.6 116.8 276.4 kg
SIKA 3006 ES 47.47 0 47.47 kg
UCY BP 12/01/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
12/01/2021 UCY BP-01 270421 CEMENT 1.15 S4000 C3S1-SUB
12/01/2021 UCY BP-01 270422 SAND 2.48 S4000 C3S1-SUB
12/01/2021 UCY BP-01 270423 STONE 2.08 S4000 C3S1-SUB
12/01/2021 UCY BP-01 270424 SIKA 204 9.20 S4000 C3S1-SUB
12/01/2021 UCY BP-01 270425 CEMENT 1.30 S4000 C3S2-SUB
12/01/2021 UCY BP-01 270426 SAND 2.90 S4000 C3S2-SUB
12/01/2021 UCY BP-01 270427 STONE 2.60 S4000 C3S2-SUB
12/01/2021 UCY BP-01 270428 SIKA 204 10.50 S4000 C3S2-SUB
12/01/2021 UCY BP-01 270429 CEMENT 7.91 20103
12/01/2021 UCY BP-01 270430 SAND 14.45 20103
12/01/2021 UCY BP-01 270431 STONE 17.87 20103
12/01/2021 UCY BP-01 270432 SIKA 204 47.47 20103
12/01/2021 UCY BP-01 270433 CEMENT 0.84 33003 C3S2 -ARC
12/01/2021 UCY BP-01 270434 SAND 1.69 33003 C3S2 -ARC
12/01/2021 UCY BP-01 270435 STONE 2.07 33003 C3S2 -ARC
12/01/2021 UCY BP-01 270436 SIKA 204 8.40 33003 C3S2 -ARC
12/01/2021 UCY BP-02 270437 CEMENT 10.31 28003 C3ML-SUB
12/01/2021 UCY BP-02 270438 SAND 21.46 28003 C3ML-SUB
12/01/2021 UCY BP-02 270439 STONE 24.32 28003 C3ML-SUB
12/01/2021 UCY BP-02 270440 SIKA 204 98.70 28003 C3ML-SUB
12/01/2021 UCY BP-02 270441 CEMENT 5.05 S4000 C3S4 -SUB
12/01/2021 UCY BP-02 270442 SAND 9.62 S4000 C3S4 -SUB
12/01/2021 UCY BP-02 270443 STONE 10.86 S4000 C3S4 -SUB
12/01/2021 UCY BP-02 270444 SIKA 204 48.30 S4000 C3S4 -SUB
12/01/2021 UCY BP-02 270445 CEMENT 1.15 28006 C3ML-SUB
12/01/2021 UCY BP-02 270446 SAND 2.10 28006 C3ML-SUB
12/01/2021 UCY BP-02 270447 STONE 2.59 28006 C3ML-SUB
12/01/2021 UCY BP-02 270448 SIKA 204 11.50 28006 C3ML-SUB
12/01/2021 UCY BP-02 270449 CEMENT 1.05 33003 C3S1-ARC
12/01/2021 UCY BP-02 270450 SAND 2.11 33003 C3S1-ARC
12/01/2021 UCY BP-02 270451 STONE 2.59 33003 C3S1-ARC
12/01/2021 UCY BP-02 270452 SIKA 204 10.50 33003 C3S1-ARC
12/01/2021 UCY BP-01 - CEMENT 41.17 CP-0602
12/01/2021 UCY BP-01 - SAND 73.21 CP-0602
12/01/2021 UCY BP-01 - STONE 94.33 CP-0602
12/01/2021 UCY BP-01 - SIKA 3006 ES 247.02 CP-0602
12/01/2021 UCY BP-02 - CEMENT 27.26 CP-07
12/01/2021 UCY BP-02 - SAND 55.53 CP-07
12/01/2021 UCY BP-02 - STONE 69.43 CP-07
12/01/2021 UCY BP-02 - SIKA 204 299.91 CP-07
12/01/2021 UCY BP-02 - CEMENT 0.69 CP-0602
12/01/2021 UCY BP-02 - SAND 1.22 CP-0602
12/01/2021 UCY BP-02 - STONE 1.58 CP-0602
12/01/2021 UCY BP-02 - SIKA 3006 ES 4.14 CP-0602

Record BY Check by
Operator Plant Engineer

Check by
Engineer THAI
RECORDER
CEMENT 97.88 tons
SAND 186.77 tons
STONE 230.32 tons
SIKA 204 544.48 kg
SIKA 3006 ES 251.16 kg

UCY BP-01 UCY BP-02 total


CEMENT 52.37 45.51 97.88 tons
SAND 94.73 92.04 186.77 tons
STONE 118.95 111.37 230.32 tons
SIKA 204 75.57 468.91 544.48 kg
SIKA 3006 ES 247.02 4.14 251.16 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 41.17 0.69 41.86 tons
SAND 73.21 1.22 74.43 tons
STONE 94.33 1.58 95.91 tons
SIKA 204 0 0 0 kg
SIKA 3006 ES 247.02 4.14 251.16 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 0 27.26 27.26 tons
SAND 0 55.53 55.53 tons
STONE 0 69.43 69.43 tons
SIKA 204 0 299.91 299.91 kg
SIKA 3006 ES 0 0 0 kg

CP-03&04

UCY BP-01 UCY BP-02 total


CEMENT 11.2 17.56 28.76 tons
SAND 21.52 35.29 56.81 tons
STONE 24.62 40.36 64.98 tons
SIKA 204 75.57 169 244.57 kg
SIKA 3006 ES 0 0 0 kg
CP-0602
CP-07
UCY BP 13/01/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
13/01/2021 UCY BP-02 270494 CEMENT 1.84 S4000 C3S1-SUB
13/01/2021 UCY BP-02 270495 SAND 3.74 S4000 C3S1-SUB
13/01/2021 UCY BP-02 270496 STONE 3.63 S4000 C3S1-SUB
13/01/2021 UCY BP-02 270497 SIKA 204 16.10 S4000 C3S1-SUB
13/01/2021 UCY BP-02 270499 CEMENT 2.96 28003
13/01/2021 UCY BP-02 270500 SAND 6.28 28003
13/01/2021 UCY BP-02 270501 STONE 6.74 28003
13/01/2021 UCY BP-02 270502 SIKA 204 27.30 28003
13/01/2021 UCY BP-02 270503 CEMENT 2.75 24000 C3ML-SUB
13/01/2021 UCY BP-02 270504 SAND 5.86 24000 C3ML-SUB
13/01/2021 UCY BP-02 270505 STONE 6.22 24000 C3ML-SUB
13/01/2021 UCY BP-02 270506 SIKA 204 25.20 24000 C3ML-SUB
13/01/2021 UCY BP-02 270507 CEMENT 7.91 20103
13/01/2021 UCY BP-02 270508 SAND 14.41 20103
13/01/2021 UCY BP-02 270509 STONE 17.80 20103
13/01/2021 UCY BP-02 270510 SIKA 3006 ES 47.47 20103
13/01/2021 UCY BP-02 270511 CEMENT 1.61 26012
13/01/2021 UCY BP-02 270512 SAND 2.94 26012
13/01/2021 UCY BP-02 270513 STONE 3.63 26012
13/01/2021 UCY BP-02 270514 SIKA 204 16.10 26012
13/01/2021 UCY BP-02 270515 CEMENT 1.26 33003 C3S4-ARC
13/01/2021 UCY BP-02 270516 SAND 2.53 33003 C3S4-ARC
13/01/2021 UCY BP-02 270517 STONE 3.11 33003 C3S4-ARC
13/01/2021 UCY BP-02 270518 SIKA 204 12.60 33003 C3S4-ARC
13/01/2021 UCY BP-01 - CEMENT 42.32 CP-0602
13/01/2021 UCY BP-01 - SAND 75.53 CP-0602
13/01/2021 UCY BP-01 - STONE 97.15 CP-0602
13/01/2021 UCY BP-01 - SIKA 3006 ES 253.92 CP-0602
13/01/2021 UCY BP-02 - CEMENT 1.38 CP-0602
13/01/2021 UCY BP-02 - SAND 2.45 CP-0602
13/01/2021 UCY BP-02 - STONE 3.17 CP-0602
13/01/2021 UCY BP-02 - SIKA 3006 ES 8.28 CP-0602
13/01/2021 UCY BP-02 - CEMENT 26.24 CP-07
13/01/2021 UCY BP-02 - SAND 52.99 CP-07
13/01/2021 UCY BP-02 - STONE 66.94 CP-07
13/01/2021 UCY BP-02 - SIKA 204 288.64 CP-07
Record BY Check by
Operator Plant Engineer

Check by
Engineer THAI
RECORDER
CEMENT 88.27 tons
SAND 166.73 tons
STONE 208.39 tons
SIKA 204 385.94 kg
SIKA 3006 ES 309.67 kg

UCY BP-01 UCY BP-02 total


CEMENT 42.32 45.95 88.27 tons
SAND 75.53 91.2 166.73 tons
STONE 97.15 111.24 208.39 tons
SIKA 204 0 385.94 385.94 kg
SIKA 3006 ES 253.92 55.75 309.67 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 42.32 1.38 43.7 tons
SAND 75.53 2.45 77.98 tons
STONE 97.15 3.17 100.32 tons
SIKA 204 0 0 0 kg
SIKA 3006 ES 253.92 8.28 262.2 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 0 26.24 26.24 tons
SAND 0 52.99 52.99 tons
STONE 0 66.94 66.94 tons
SIKA 204 0 288.64 288.64 kg
SIKA 3006 ES 0 0 0 kg

CP-03&04

UCY BP-01 UCY BP-02 total


CEMENT 0 18.33 18.33 tons
SAND 0 35.76 35.76 tons
STONE 0 41.13 41.13 tons
SIKA 204 0 97.3 97.3 kg
SIKA 3006 ES 0 47.47 47.47 kg
CP-0602
CP-07
UCY BP 14/01/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
14/01/2021 UCY BP-01 273019 CEMENT 7.91 20103 C3S1 -SUB
14/01/2021 UCY BP-01 273020 SAND 14.55 20103 C3S1 -SUB
14/01/2021 UCY BP-01 273021 STONE 17.80 20103 C3S1 -SUB
14/01/2021 UCY BP-01 273022 SIKA 3006 ES 47.47 20103 C3S1 -SUB
14/01/2021 UCY BP-02 273023 CEMENT 3.72 33003 C3S3-ARC
14/01/2021 UCY BP-02 273024 SAND 9.47 33003 C3S3-ARC
14/01/2021 UCY BP-02 273025 STONE 10.87 33003 C3S3-ARC
14/01/2021 UCY BP-02 273026 SIKA 204 49.00 33003 C3S3-ARC
14/01/2021 UCY BP-02 273027 CEMENT 17.03 28003 C3ML-SUB
14/01/2021 UCY BP-02 273028 SAND 34.78 28003 C3ML-SUB
14/01/2021 UCY BP-02 273029 STONE 40.88 28003 C3ML-SUB
14/01/2021 UCY BP-02 273030 SIKA 204 165.90 28003 C3ML-SUB
14/01/2021 UCY BP-02 273031 CEMENT 0.46 S4000 C3S1-SUB
14/01/2021 UCY BP-02 273032 SAND 0.84 S4000 C3S1-SUB
14/01/2021 UCY BP-02 273033 STONE 1.03 S4000 C3S1-SUB
14/01/2021 UCY BP-02 273034 SIKA 204 4.60 S4000 C3S1-SUB
14/01/2021 UCY BP-02 273035 CEMENT 1.61 26102 C3ML-SUB
14/01/2021 UCY BP-02 273036 SAND 2.93 26102 C3ML-SUB
14/01/2021 UCY BP-02 273037 STONE 3.62 26102 C3ML-SUB
14/01/2021 UCY BP-02 273038 SIKA 204 16.10 26102 C3ML-SUB
14/01/2021 UCY BP-02 273039 CEMENT 1.38 S4000 C3S2-SUB
14/01/2021 UCY BP-02 273040 SAND 2.51 S4000 C3S2-SUB
14/01/2021 UCY BP-02 273041 STONE 3.10 S4000 C3S2-SUB
14/01/2021 UCY BP-02 273042 SIKA 204 13.80 S4000 C3S2-SUB
14/01/2021 UCY BP-02 273043 CEMENT 1.68 33003 C3S2 ARC
14/01/2021 UCY BP-02 273044 SAND 3.36 33003 C3S2 ARC
14/01/2021 UCY BP-02 273045 STONE 4.14 33003 C3S2 ARC
14/01/2021 UCY BP-02 273046 SIKA 204 16.80 33003 C3S2 ARC
14/01/2021 UCY BP-02 273047 CEMENT 0.42 33003 C3S4-ARC
14/01/2021 UCY BP-02 273048 SAND 0.84 33003 C3S4-ARC
14/01/2021 UCY BP-02 273049 STONE 1.03 33003 C3S4-ARC
14/01/2021 UCY BP-02 273050 SIKA 204 4.20 33003 C3S4-ARC
14/01/2021 UCY BP-01 - CEMENT 29.67 CP-0602
14/01/2021 UCY BP-01 - SAND 52.95 CP-0602
14/01/2021 UCY BP-01 - STONE 67.85 CP-0602
14/01/2021 UCY BP-01 - SIKA 3006 ES 178.02 CP-0602
14/01/2021 UCY BP-01 - CEMENT 16.81 CP-07
14/01/2021 UCY BP-01 - SAND 34.19 CP-07
14/01/2021 UCY BP-01 - STONE 42.85 CP-07
14/01/2021 UCY BP-01 - SIKA 204 184.91 CP-07
14/01/2021 UCY BP-02 - CEMENT 12.30 CP-07
14/01/2021 UCY BP-02 - SAND 24.48 CP-07
14/01/2021 UCY BP-02 - STONE 31.32 CP-07
14/01/2021 UCY BP-02 - SIKA 204 135.30 CP-07

Record BY Check by
Operator Plant Engineer

Check by
Engineer THAI
RECORDER
CEMENT 92.99 tons
SAND 180.9 tons
STONE 224.49 tons
SIKA 204 590.61 kg
SIKA 3006 ES 225.49 kg

UCY BP-01 UCY BP-02 total


CEMENT 54.39 38.6 92.99 tons
SAND 101.69 79.21 180.9 tons
STONE 128.5 95.99 224.49 tons
SIKA 204 184.91 405.7 590.61 kg
SIKA 3006 ES 225.49 0 225.49 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 29.67 0 29.67 tons
SAND 52.95 0 52.95 tons
STONE 67.85 0 67.85 tons
SIKA 204 0 0 0 kg
SIKA 3006 ES 178.02 0 178.02 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 16.81 12.3 29.11 tons
SAND 34.19 24.48 58.67 tons
STONE 42.85 31.32 74.17 tons
SIKA 204 184.91 135.3 320.21 kg
SIKA 3006 ES 0 0 0 kg

CP-03&04

UCY BP-01 UCY BP-02 total


CEMENT 7.91 26.3 34.21 tons
SAND 14.55 54.73 69.28 tons
STONE 17.8 64.67 82.47 tons
SIKA 204 0 270.4 270.4 kg
SIKA 3006 ES 47.47 0 47.47 kg
CP-0602
CP-07
UCY BP 15/01/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
15/01/2021 UCY BP-01 273051 CEMENT 30.24 28003 C3ML-SUB
15/01/2021 UCY BP-01 273052 SAND 60.77 28003 C3ML-SUB
15/01/2021 UCY BP-01 273053 STONE 74.52 28003 C3ML-SUB
15/01/2021 UCY BP-01 273054 SIKA 204 302.40 28003 C3ML-SUB
15/01/2021 UCY BP-02 273055 CEMENT 46.42 28003 C3ML-SUB
15/01/2021 UCY BP-02 273056 SAND 93.64 28003 C3ML-SUB
15/01/2021 UCY BP-02 273057 STONE 113.85 28003 C3ML-SUB
15/01/2021 UCY BP-02 273058 SIKA 204 462.00 28003 C3ML-SUB
15/01/2021 UCY BP-02 273059 CEMENT 2.30 20103
15/01/2021 UCY BP-02 273060 SAND 4.22 20103
15/01/2021 UCY BP-02 273061 STONE 5.16 20103
15/01/2021 UCY BP-02 273062 SIKA 3006 ES 13.80 20103
15/01/2021 UCY BP-02 273063 CEMENT 1.34 33003 C3S1 ARC
15/01/2021 UCY BP-02 273064 SAND 2.70 33003 C3S1 ARC
15/01/2021 UCY BP-02 273065 STONE 3.31 33003 C3S1 ARC
15/01/2021 UCY BP-02 273066 SIKA 204 13.44 33003 C3S1 ARC
Record BY Check by
Operator Plant Engineer

Check by
Engineer THAI
RECORDER
CEMENT 80.3 tons
SAND 161.33 tons
STONE 196.84 tons
SIKA 204 777.84 kg
SIKA 3006 ES 13.80 kg

UCY BP-01 UCY BP-02 total


CEMENT 30.24 50.06 80.3 tons
SAND 60.77 100.56 161.33 tons
STONE 74.52 122.32 196.84 tons
SIKA 204 302.4 475.44 777.84 kg
SIKA 3006 ES 0 13.8 13.8 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 0 0 0 tons
SAND 0 0 0 tons
STONE 0 0 0 tons
SIKA 204 0 0 0 kg
SIKA 3006 ES 0 0 0 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 0 0 0 tons
SAND 0 0 0 tons
STONE 0 0 0 tons
SIKA 204 0 0 0 kg
SIKA 3006 ES 0 0 0 kg

CP-03&04

UCY BP-01 UCY BP-02 total


CEMENT 30.24 50.06 80.3 tons
SAND 60.77 100.56 161.33 tons
STONE 74.52 122.32 196.84 tons
SIKA 204 302.4 475.44 777.84 kg
SIKA 3006 ES 0 13.8 13.8 kg
SIKA 3006 ES
CP-0602
CP-07
UCY BP 16/01/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
16/01/2021 UCY BP-01 273067 CEMENT 15.12 S4000 C4S8 -SUB
16/01/2021 UCY BP-01 273068 SAND 30.38 S4000 C4S8 -SUB
16/01/2021 UCY BP-01 273069 STONE 37.26 S4000 C4S8 -SUB
16/01/2021 UCY BP-01 273070 SIKA 204 151.20 S4000 C4S8 -SUB
16/01/2021 UCY BP-01 273071 CEMENT 9.94 26101
16/01/2021 UCY BP-01 273072 SAND 18.08 26101
16/01/2021 UCY BP-01 273073 STONE 22.34 26101
16/01/2021 UCY BP-01 273074 SIKA 204 18.40 26101
16/01/2021 UCY BP-01 273075 SIKA 3006 ES 48.58 26101
16/01/2021 UCY BP-01 273076 CEMENT 0.28 28001
16/01/2021 UCY BP-01 273077 SAND 0.50 28001
16/01/2021 UCY BP-01 273078 STONE 0.62 28001
16/01/2021 UCY BP-01 273079 SIKA 3006 ES 1.66 28001
16/01/2021 UCY BP-01 273080 CEMENT 0.25 S4000 C3S4 -SUB
16/01/2021 UCY BP-01 273081 SAND 0.79 S4000 C3S4 -SUB
16/01/2021 UCY BP-01 273082 SIKA 204 1.50 S4000 C3S4 -SUB
16/01/2021 UCY BP-01 273083 CEMENT 1.38 S4000 C3S2-SUB
16/01/2021 UCY BP-01 273084 SAND 2.51 S4000 C3S2-SUB
16/01/2021 UCY BP-01 273085 STONE 3.10 S4000 C3S2-SUB
16/01/2021 UCY BP-01 273086 SIKA 204 13.80 S4000 C3S2-SUB
16/01/2021 UCY BP-01 273087 CEMENT 13.23 33003 C3S3 ARC
16/01/2021 UCY BP-01 273088 SAND 33.21 33003 C3S3 ARC
16/01/2021 UCY BP-01 273089 STONE 39.75 33003 C3S3 ARC
16/01/2021 UCY BP-01 273090 SIKA 204 178.85 33003 C3S3 ARC
16/01/2021 UCY BP-02 273091 CEMENT 22.68 S4000 C4S8 -SUB
16/01/2021 UCY BP-02 273092 SAND 45.90 S4000 C4S8 -SUB
16/01/2021 UCY BP-02 273093 STONE 56.05 S4000 C4S8 -SUB
16/01/2021 UCY BP-02 273094 SIKA 204 226.80 S4000 C4S8 -SUB
16/01/2021 UCY BP-02 273095 CEMENT 0.42 33003 C3S4 ARC
16/01/2021 UCY BP-02 273096 SAND 0.85 33003 C3S4 ARC
16/01/2021 UCY BP-02 273097 STONE 1.04 33003 C3S4 ARC
16/01/2021 UCY BP-02 273098 SIKA 204 4.20 33003 C3S4 ARC
16/01/2021 UCY BP-02 273099 CEMENT 0.84 33003 C3S2 ARC
16/01/2021 UCY BP-02 273100 SAND 1.70 33003 C3S2 ARC
16/01/2021 UCY BP-02 273201 STONE 2.08 33003 C3S2 ARC
16/01/2021 UCY BP-02 273202 SIKA 204 8.40 33003 C3S2 ARC
16/01/2021 UCY BP-02 273203 CEMENT 4.83 33003 C3S3 ARC
16/01/2021 UCY BP-02 273204 SAND 9.78 33003 C3S3 ARC
16/01/2021 UCY BP-02 273205 STONE 11.94 33003 C3S3 ARC
16/01/2021 UCY BP-02 273206 SIKA 204 48.30 33003 C3S3 ARC
16/01/2021 UCY BP-02 273207 CEMENT 2.10 28003
16/01/2021 UCY BP-02 273208 SAND 4.25 28003
16/01/2021 UCY BP-02 273209 STONE 5.19 28003
16/01/2021 UCY BP-02 273210 SIKA 204 21.00 28003
16/01/2021 UCY BP-02 273211 CEMENT 0.25 S4000 C3S3 SUB
16/01/2021 UCY BP-02 273212 SAND 0.81 S4000 C3S3 SUB
16/01/2021 UCY BP-02 273213 SIKA 204 1.50 S4000 C3S3 SUB
16/01/2021 UCY BP-01 - CEMENT 4.51 CP-07
16/01/2021 UCY BP-01 - SAND 9.02 CP-07
16/01/2021 UCY BP-01 - STONE 11.41 CP-07
16/01/2021 UCY BP-01 - SIKA 204 49.61 CP-07
16/01/2021 UCY BP-01 - CEMENT 30.36 CP-0602
16/01/2021 UCY BP-01 - SAND 55.24 CP-0602
16/01/2021 UCY BP-01 - STONE 68.24 CP-0602
16/01/2022 UCY BP-01 - SIKA 3006 ES 182.16 CP-0602
16/01/2021 UCY BP-02 - CEMENT 21.94 CP-07
16/01/2021 UCY BP-02 - SAND 44.41 CP-07
16/01/2021 UCY BP-02 - STONE 55.64 CP-07
16/01/2021 UCY BP-02 - SIKA 204 241.29 CP-07
16/01/2021 UCY BP-02 - CEMENT 10.58 CP-0602
16/01/2021 UCY BP-02 - SAND 18.84 CP-0602
16/01/2021 UCY BP-02 - STONE 24.27 CP-0602
16/01/2021 UCY BP-02 - SIKA 3006 ES 63.48 CP-0602

Record BY Check by
Operator Plant Engineer

Check by
Engineer THAI
RECORDER
CEMENT 138.71 tons
SAND 276.27 tons
STONE 338.93 tons
SIKA 204 964.85 kg
SIKA 3006 ES 295.88 kg

UCY BP-01 UCY BP-02 total


CEMENT 75.07 63.64 138.71 tons
SAND 149.73 126.54 276.27 tons
STONE 182.72 156.21 338.93 tons
SIKA 204 413.36 551.49 964.85 kg
SIKA 3006 ES 232.4 63.48 295.88 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 30.36 10.58 40.94 tons
SAND 55.24 18.84 74.08 tons
STONE 68.24 24.27 92.51 tons
SIKA 204 0 0 0 kg
SIKA 3006 ES 182.16 63.48 245.64 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 4.51 21.94 26.45 tons
SAND 9.02 44.41 53.43 tons
STONE 11.41 55.64 67.05 tons
SIKA 204 49.61 241.29 290.9 kg
SIKA 3006 ES 0 0 0 kg

CP-03&04

UCY BP-01 UCY BP-02 total


CEMENT 40.2 31.12 71.32 tons
SAND 85.47 63.29 148.76 tons
STONE 103.07 76.3 179.37 tons
SIKA 204 363.75 310.2 673.95 kg
SIKA 3006 ES 50.24 0 50.24 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
UCY BP 17/01/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
17/01/2021 UCY BP-01 273214 CEMENT 9.38 26101
17/01/2021 UCY BP-01 273215 SAND 17.12 26101
17/01/2021 UCY BP-01 273216 STONE 21.07 26101
17/01/2021 UCY BP-01 273217 SIKA 204 13.80 26101
17/01/2021 UCY BP-01 273218 SIKA 3006 ES 48.02 26101
17/01/2021 UCY BP-01 273219 CEMENT 0.55 28001
17/01/2021 UCY BP-01 273220 SAND 1.01 28001
17/01/2021 UCY BP-01 273221 STONE 1.24 28001
17/01/2021 UCY BP-01 273222 SIKA 3006 ES 3.31 28001
17/01/2021 UCY BP-01 273223 CEMENT 1.84 26102 C3ML-SUB
17/01/2021 UCY BP-01 273224 SAND 3.36 26102 C3ML-SUB
17/01/2021 UCY BP-01 273225 STONE 4.13 26102 C3ML-SUB
17/01/2021 UCY BP-01 273226 SIKA 204 18.04 26102 C3ML-SUB
17/01/2021 UCY BP-01 273227 CEMENT 9.89 28003
17/01/2021 UCY BP-01 273228 SAND 20.34 28003
17/01/2021 UCY BP-01 273229 STONE 23.82 28003
17/01/2021 UCY BP-01 273230 SIKA 204 96.60 28003
17/01/2021 UCY BP-02 273231 CEMENT 2.75 28002
17/01/2021 UCY BP-02 273232 SAND 5.89 28002
17/01/2021 UCY BP-02 273233 STONE 6.21 28002
17/01/2021 UCY BP-02 273234 SIKA 204 25.20 28002
17/01/2021 UCY BP-02 273235 CEMENT 6.11 28003
17/01/2021 UCY BP-02 273236 SAND 12.71 28003
17/01/2021 UCY BP-02 273237 STONE 14.49 28003
17/01/2021 UCY BP-02 273238 SIKA 204 58.80 28003
17/01/2021 UCY BP-02 273239 CEMENT 7.76 31002 C3S2-ARC
17/01/2021 UCY BP-02 273240 SAND 19.51 31002 C3S2-ARC
17/01/2021 UCY BP-02 273241 STONE 23.31 31002 C3S2-ARC
17/01/2021 UCY BP-02 273242 SIKA 204 105.35 31002 C3S2-ARC
17/01/2021 UCY BP-02 273243 CEMENT 1.15 S4000 C3S1-SUB
17/01/2021 UCY BP-02 273244 SAND 2.11 S4000 C3S1-SUB
17/01/2021 UCY BP-02 273245 STONE 2.59 S4000 C3S1-SUB
17/01/2021 UCY BP-02 273246 SIKA 204 11.50 S4000 C3S1-SUB
17/01/2021 UCY BP-01 - CEMENT 0.82 CP-07
17/01/2021 UCY BP-01 - SAND 1.66 CP-07
17/01/2021 UCY BP-01 - STONE 2.09 CP-07
17/01/2021 UCY BP-01 - SIKA 204 9.02 CP-07
17/01/2021 UCY BP-01 - CEMENT 37.40 CP-0602
17/01/2021 UCY BP-01 - SAND 66.75 CP-0602
17/01/2021 UCY BP-01 - STONE 85.53 CP-0602
17/01/2021 UCY BP-01 - SIKA 3006 ES 224.39 CP-0602
17/01/2021 UCY BP-02 - CEMENT 19.68 CP-07
17/01/2021 UCY BP-02 - SAND 39.71 CP-07
17/01/2021 UCY BP-02 - STONE 49.97 CP-07
17/01/2021 UCY BP-02 - SIKA 204 216.48 CP-07

Record BY Check by
Operator Plant Engineer

Check by
Engineer THAI
RECORDER
CEMENT 97.33 tons
SAND 190.17 tons
STONE 234.45 tons
SIKA 204 554.79 kg
SIKA 3006 ES 275.72 kg

UCY BP-01 UCY BP-02 total


CEMENT 59.88 37.45 97.33 tons
SAND 110.24 79.93 190.17 tons
STONE 137.88 96.57 234.45 tons
SIKA 204 137.46 417.33 554.79 kg
SIKA 3006 ES 275.72 0 275.72 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 37.4 0 37.4 tons
SAND 66.75 0 66.75 tons
STONE 85.53 0 85.53 tons
SIKA 204 0 0 0 kg
SIKA 3006 ES 224.39 0 224.39 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 0.82 19.68 20.5 tons
SAND 1.66 39.71 41.37 tons
STONE 2.09 49.97 52.06 tons
SIKA 204 9.02 216.48 225.5 kg
SIKA 3006 ES 0 0 0 kg

CP-03&04

UCY BP-01 UCY BP-02 total


CEMENT 21.66 17.77 39.43 tons
SAND 41.83 40.22 82.05 tons
STONE 50.26 46.6 96.86 tons
SIKA 204 128.44 200.85 329.29 kg
SIKA 3006 ES 51.33 0 51.33 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
UCY BP 18/01/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
18/01/2021 UCY BP-01 273301 CEMENT 8.00 20103
18/01/2021 UCY BP-01 273302 SAND 14.65 20103
18/01/2021 UCY BP-01 273303 STONE 18.00 20103
18/01/2021 UCY BP-01 273304 SIKA 3006 ES 48.02 20103
18/01/2021 UCY BP-01 273305 CEMENT 1.38 26100
18/01/2021 UCY BP-01 273306 SAND 2.53 26100
18/01/2021 UCY BP-01 273307 STONE 3.11 26100
18/01/2021 UCY BP-01 273308 SIKA 204 13.80 26100
18/01/2021 UCY BP-01 273309 CEMENT 0.92 S4000 C3S1 -SUB
18/01/2021 UCY BP-01 273310 SAND 1.68 S4000 C3S1 -SUB
18/01/2021 UCY BP-01 273311 STONE 2.07 S4000 C3S1 -SUB
18/01/2021 UCY BP-01 273312 SIKA 204 9.20 S4000 C3S1 -SUB
18/01/2021 UCY BP-01 273313 CEMENT 0.46 S4000 C4S5-SUB
18/01/2021 UCY BP-01 273314 SAND 1.92 S4000 C4S5-SUB
18/01/2021 UCY BP-01 273315 STONE 2.11 S4000 C4S5-SUB
18/01/2021 UCY BP-01 273316 SIKA 204 4.60 S4000 C4S5-SUB
18/01/2021 UCY BP-01 273317 CEMENT 2.75 28003 C3ML-SUB
18/01/2021 UCY BP-01 273318 SAND 5.88 28003 C3ML-SUB
18/01/2021 UCY BP-01 273319 STONE 6.21 28003 C3ML-SUB
18/01/2021 UCY BP-01 273320 SIKA 204 25.2 28003 C3ML-SUB
18/01/2021 UCY BP-01 273321 CEMENT 0.42 28002
18/01/2021 UCY BP-01 273322 SAND 0.85 28002
18/01/2021 UCY BP-01 273323 STONE 1.04 28002
18/01/2021 UCY BP-01 273324 SIKA 204 4.2 28002
18/01/2021 UCY BP-01 273325 CEMENT 1.05 33003 C3S2 ARC
18/01/2021 UCY BP-01 273326 SAND 2.12 33003 C3S2 ARC
18/01/2021 UCY BP-01 273327 STONE 2.59 33003 C3S2 ARC
18/01/2021 UCY BP-01 273328 SIKA 204 10.50 33003 C3S2 ARC
18/01/2021 UCY BP-02 273329 CEMENT 2.75 28001 S/J
18/01/2021 UCY BP-02 273330 SAND 5.88 28001 S/J
18/01/2021 UCY BP-02 273331 STONE 6.21 28001 S/J
18/01/2021 UCY BP-02 273332 SIKA 204 25.20 28001 S/J
18/01/2021 UCY BP-02 273333 CEMENT 4.85 28003 S/J
18/01/2021 UCY BP-02 273334 SAND 10.12 28003 S/J
18/01/2021 UCY BP-02 273335 STONE 11.36 28003 S/J
18/01/2021 UCY BP-02 273336 SIKA 204 46.20 28003 S/J
18/01/2021 UCY BP-02 273337 CEMENT 9.29 S4000 C3S4-SUB
18/01/2021 UCY BP-02 273338 SAND 17.41 S4000 C3S4-SUB
18/01/2021 UCY BP-02 273339 STONE 20.34 S4000 C3S4-SUB
18/01/2021 UCY BP-02 273340 SIKA 204 90.62 S4000 C3S4-SUB
18/01/2021 UCY BP-02 273341 CEMENT 1.39 33003 C3S1 ARC
18/01/2021 UCY BP-02 273342 SAND 2.81 33003 C3S1 ARC
18/01/2021 UCY BP-02 273343 STONE 3.51 33003 C3S1 ARC
18/01/2021 UCY BP-02 273344 SIKA 204 13.86 33003 C3S1 ARC
18/01/2021 UCY BP-02 - CEMENT 27.06 CP-07
18/01/2021 UCY BP-02 - SAND 54.58 CP-07
18/01/2021 UCY BP-02 - STONE 68.84 CP-07
18/01/2021 UCY BP-02 - SIKA 204 297.66 CP-07
18/01/2021 UCY BP-01 - CEMENT 45.12 CP-0602
18/01/2021 UCY BP-01 - SAND 80.34 CP-0602
18/01/2021 UCY BP-01 - STONE 103.39 CP-0602
18/01/2021 UCY BP-01 - SIKA 3006 ES 270.76 CP-0602

Record BY Check by
Operator Plant Engineer

Check by
Engineer THAI
RECORDER
CEMENT 105.44 tons
SAND 200.77 tons
STONE 248.78 tons
SIKA 204 541.04 kg
SIKA 3006 ES 318.78 kg

UCY BP-01 UCY BP-02 total


CEMENT 60.1 45.34 105.44 tons
SAND 109.97 90.8 200.77 tons
STONE 138.52 110.26 248.78 tons
SIKA 204 67.5 473.54 541.04 kg
SIKA 3006 ES 318.78 0 318.78 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 45.12 0 45.12 tons
SAND 80.34 0 80.34 tons
STONE 103.39 0 103.39 tons
SIKA 204 0 0 0 kg
SIKA 3006 ES 270.76 0 270.76 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 0 27.06 27.06 tons
SAND 0 54.58 54.58 tons
STONE 0 68.84 68.84 tons
SIKA 204 0 297.66 297.66 kg
SIKA 3006 ES 0 0 0 kg

CP-03&04

UCY BP-01 UCY BP-02 total


CEMENT 14.98 18.28 33.26 tons
SAND 29.63 36.22 65.85 tons
STONE 35.13 41.42 76.55 tons
SIKA 204 67.5 175.88 243.38 kg
SIKA 3006 ES 48.02 0 48.02 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
UCY BP 19/01/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
19/01/2021 UCY BP-01 273345 CEMENT 8.01 20103 C3ML-SUB
19/01/2021 UCY BP-01 273346 SAND 14.62 20103 C3ML-SUB
19/01/2021 UCY BP-01 273347 STONE 18.01 20103 C3ML-SUB
19/01/2021 UCY BP-01 273348 SIKA 3006 ES 48.02 20103 C3ML-SUB
19/01/2021 UCY BP-01 273349 CEMENT 0.84 33003 C3S2 ARC
19/01/2021 UCY BP-01 273350 SAND 1.68 33003 C3S2 ARC
19/01/2021 UCY BP-01 273351 STONE 2.06 33003 C3S2 ARC
19/01/2021 UCY BP-01 273352 SIKA 204 8.40 33003 C3S2 ARC
19/01/2021 UCY BP-01 273353 CEMENT 45.99 S4000 C3S4-ARC
19/01/2021 UCY BP-01 273354 SAND 92.20 S4000 C3S4-ARC
19/01/2021 UCY BP-01 273355 STONE 112.57 S4000 C3S4-ARC
19/01/2021 UCY BP-01 273356 SIKA 204 459.90 S4000 C3S4-ARC
19/01/2021 UCY BP-02 273357 CEMENT 7.78 28002 C3ML-SUB
19/01/2021 UCY BP-02 273358 SAND 15.96 28002 C3ML-SUB
19/01/2021 UCY BP-02 273359 STONE 18.50 28002 C3ML-SUB
19/01/2021 UCY BP-02 273360 SIKA 204 75.60 28002 C3ML-SUB
19/01/2021 UCY BP-02 273361 CEMENT 3.91 33003 C3S1-ARC
19/01/2021 UCY BP-02 273362 SAND 9.89 33003 C3S1-ARC
19/01/2021 UCY BP-02 273363 STONE 11.40 33003 C3S1-ARC
19/01/2021 UCY BP-02 273364 SIKA 204 51.45 33003 C3S1-ARC
19/01/2021 UCY BP-02 273365 CEMENT 74.21 S4000 C3S4 SUB
19/01/2021 UCY BP-02 273366 SAND 149.34 S4000 C3S4 SUB
19/01/2021 UCY BP-02 273367 STONE 180.41 S4000 C3S4 SUB
19/01/2021 UCY BP-02 273368 SIKA 204 737.10 S4000 C3S4 SUB
19/01/2021 UCY BP-02 273369 CEMENT 1.38 26101
19/01/2021 UCY BP-02 273370 SAND 2.52 26101
19/01/2021 UCY BP-02 273371 STONE 3.10 26101
19/01/2021 UCY BP-02 273372 SIKA 204 13.8 26101
19/01/2021 UCY BP-01 - CEMENT 1.44 CP-07
19/01/2021 UCY BP-01 - SAND 2.91 CP-07
19/01/2021 UCY BP-01 - STONE 3.65 CP-07
19/01/2021 UCY BP-01 - SIKA 204 15.79 CP-07
19/01/2021 UCY BP-01 - CEMENT 41.68 CP-0602
19/01/2021 UCY BP-01 - SAND 74.81 CP-0602
19/01/2021 UCY BP-01 - STONE 95.52 CP-0602
19/01/2021 UCY BP-01 - SIKA 3006 ES 248.28 CP-0602
Record BY Check by
Operator Plant Engineer

Check by
Engineer THAI
RECORDER
CEMENT 185.24 tons
SAND 363.93 tons
STONE 445.22 tons
SIKA 204 1362.04 kg
SIKA 3006 ES 296.30 kg

UCY BP-01 UCY BP-02 total


CEMENT 97.96 87.28 185.24 tons
SAND 186.22 177.71 363.93 tons
STONE 231.81 213.41 445.22 tons
SIKA 204 484.09 877.95 1362.04 kg
SIKA 3006 ES 296.3 0 296.3 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 41.68 0 41.68 tons
SAND 74.81 0 74.81 tons
STONE 95.52 0 95.52 tons
SIKA 204 0 0 0 kg
SIKA 3006 ES 248.28 0 248.28 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 1.44 0 1.44 tons
SAND 2.91 0 2.91 tons
STONE 3.65 0 3.65 tons
SIKA 204 15.79 0 15.79 kg
SIKA 3006 ES 0 0 0 kg

CP-03&04

UCY BP-01 UCY BP-02 total


CEMENT 54.84 87.28 142.12 tons
SAND 108.5 177.71 286.21 tons
STONE 132.64 213.41 346.05 tons
SIKA 204 468.3 877.95 1346.25 kg
SIKA 3006 ES 48.02 0 48.02 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
UCY BP 20/01/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
20/01/2021 UCY BP-01 273373 CEMENT 61.95 S4000 C3S4 SUB
20/01/2021 UCY BP-01 273374 SAND 124.20 S4000 C3S4 SUB
20/01/2021 UCY BP-01 273375 STONE 152.96 S4000 C3S4 SUB
20/01/2021 UCY BP-01 273376 SIKA 204 619.50 S4000 C3S4 SUB
20/01/2021 UCY BP-01 273377 CEMENT 7.91 20103 C3ML-SUB
20/01/2021 UCY BP-01 273378 SAND 14.41 20103 C3ML-SUB
20/01/2021 UCY BP-01 273379 STONE 17.84 20103 C3ML-SUB
20/01/2021 UCY BP-01 273380 SIKA 3006 ES 47.47 20103 C3ML-SUB
20/01/2021 UCY BP-01 273381 CEMENT 0.92 26101
20/01/2021 UCY BP-01 273382 SAND 1.68 26101
20/01/2021 UCY BP-01 273383 STONE 2.07 26101
20/01/2021 UCY BP-01 273384 SIKA 204 9.20 26101
20/01/2021 UCY BP-02 273385 CEMENT 50.85 S4000 C3S4 SUB
20/01/2021 UCY BP-02 273386 SAND 102.55 S4000 C3S4 SUB
20/01/2021 UCY BP-02 273387 STONE 124.08 S4000 C3S4 SUB
20/01/2021 UCY BP-02 273388 SIKA 204 506.20 S4000 C3S4 SUB
20/01/2021 UCY BP-02 273389 CEMENT 1.61 S4000 C3S1 SUB
20/01/2021 UCY BP-02 273390 SAND 3.33 S4000 C3S1 SUB
20/01/2021 UCY BP-02 273391 STONE 3.10 S4000 C3S1 SUB
20/01/2021 UCY BP-02 273392 SIKA 204 13.80 S4000 C3S1 SUB
20/01/2021 UCY BP-02 273393 CEMENT 0.69 28006 C3ML-SUB
20/01/2021 UCY BP-02 273394 SAND 1.27 28006 C3ML-SUB
20/01/2021 UCY BP-02 273395 STONE 1.55 28006 C3ML-SUB
20/01/2021 UCY BP-02 273396 SIKA 204 6.90 28006 C3ML-SUB
20/01/2021 UCY BP-02 273397 CEMENT 1.38 S4000 C3S2 SUB
20/01/2021 UCY BP-02 273398 SAND 2.53 S4000 C3S2 SUB
20/01/2021 UCY BP-02 273399 STONE 3.10 S4000 C3S2 SUB
20/01/2021 UCY BP-02 273400 SIKA 204 13.8 S4000 C3S2 SUB
20/01/2021 UCY BP-02 273101 CEMENT 0.46 26100 C3ML-SUB
20/01/2021 UCY BP-02 273402 SAND 0.84 26100 C3ML-SUB
20/01/2021 UCY BP-02 273403 STONE 1.03 26100 C3ML-SUB
20/01/2021 UCY BP-02 273404 SIKA 204 4.60 26100 C3ML-SUB
20/01/2021 UCY BP-02 273405 CEMENT 3.99 28003 C3ML-SUB
20/01/2021 UCY BP-02 273406 SAND 8.06 28003 C3ML-SUB
20/01/2021 UCY BP-02 273407 STONE 9.82 28003 C3ML-SUB
20/01/2021 UCY BP-02 273408 SIKA 204 39.90 28003 C3ML-SUB
20/01/2021 UCY BP-02 273409 CEMENT 2.52 33003 C3S3 ARC
20/01/2021 UCY BP-02 273410 SAND 5.09 33003 C3S3 ARC
20/01/2021 UCY BP-02 273411 STONE 6.20 33003 C3S3 ARC
20/01/2021 UCY BP-02 273412 SIKA 204 25.20 33003 C3S3 ARC
20/01/2021 UCY BP-02 273413 CEMENT 1.89 28001 S/J
20/01/2021 UCY BP-02 273414 SAND 3.83 28001 S/J
20/01/2021 UCY BP-02 273415 STONE 4.66 28001 S/J
20/01/2021 UCY BP-02 273416 SIKA 204 18.90 28001 S/J
20/01/2021 UCY BP-02 - CEMENT 16.81 CP-07
20/01/2021 UCY BP-02 - SAND 33.83 CP-07
20/01/2021 UCY BP-02 - STONE 42.89 CP-07
20/01/2021 UCY BP-02 - SIKA 204 184.91 CP-07
20/01/2021 UCY BP-01 - CEMENT 42.60 CP-0602
20/01/2021 UCY BP-01 - SAND 76.75 CP-0602
20/01/2021 UCY BP-01 - STONE 98.39 CP-0602
20/01/2021 UCY BP-01 - SIKA 3006 ES 251.53 CP-0602

Record BY Check by
Operator Plant Engineer

Check by
Engineer THAI
RECORDER
CEMENT 193.58 tons
SAND 378.37 tons
STONE 467.69 tons
SIKA 204 1442.91 kg
SIKA 3006 ES 299.00 kg

UCY BP-01 UCY BP-02 total


CEMENT 113.38 80.2 193.58 tons
SAND 217.04 161.33 378.37 tons
STONE 271.26 196.43 467.69 tons
SIKA 204 628.7 814.21 1442.91 kg
SIKA 3006 ES 299 0 299 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 42.6 0 42.6 tons
SAND 76.75 0 76.75 tons
STONE 98.39 0 98.39 tons
SIKA 204 0 0 0 kg
SIKA 3006 ES 251.53 0 251.53 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 0 16.81 16.81 tons
SAND 0 33.83 33.83 tons
STONE 0 42.89 42.89 tons
SIKA 204 0 184.91 184.91 kg
SIKA 3006 ES 0 0 0 kg

CP-03&04

UCY BP-01 UCY BP-02 total


CEMENT 70.78 63.39 134.17 tons
SAND 140.29 127.5 267.79 tons
STONE 172.87 153.54 326.41 tons
SIKA 204 628.7 629.3 1258 kg
SIKA 3006 ES 47.47 0 47.47 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
UCY BP 21/01/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
21/01/2021 UCY BP-01 273117 CEMENT 0.23 28003 C3ML-SUB
21/01/2021 UCY BP-01 273118 SAND 0.80 28003 C3ML-SUB
21/01/2021 UCY BP-01 273119 CEMENT 18.08 28002 SP-A-SUP
21/01/2021 UCY BP-01 273120 SAND 36.55 28002 SP-A-SUP
21/01/2021 UCY BP-01 273121 STONE 43.90 28002 SP-A-SUP
21/01/2021 UCY BP-01 273122 SIKA 204 178.50 28002 SP-A-SUP
21/01/2021 UCY BP-01 273123 CEMENT 0.69 28006 C3ML-SUB
21/01/2021 UCY BP-01 273124 SAND 1.25 28006 C3ML-SUB
21/01/2021 UCY BP-01 273125 STONE 1.24 28006 C3ML-SUB
21/01/2021 UCY BP-01 273126 SIKA 204 6.90 28006 C3ML-SUB
21/01/2021 UCY BP-01 273127 CEMENT 7.91 20103 C3ML-SUB
21/01/2021 UCY BP-01 273128 SAND 14.38 20103 C3ML-SUB
21/01/2021 UCY BP-01 273129 STONE 17.77 20103 C3ML-SUB
21/01/2021 UCY BP-01 273130 SIKA 3006 ES 47.47 20103 C3ML-SUB
21/01/2021 UCY BP-01 273131 CEMENT 0.92 28001
21/01/2021 UCY BP-01 273132 SAND 1.67 28001
21/01/2021 UCY BP-01 273133 STONE 2.06 28001
21/01/2021 UCY BP-01 273134 SIKA 3006 ES 5.52 28001
21/01/2021 UCY BP-01 273135 CEMENT 1.26 33003 C3S2 -ARC
21/01/2021 UCY BP-01 273136 SAND 2.52 33003 C3S2 -ARC
21/01/2021 UCY BP-01 273137 STONE 3.10 33003 C3S2 -ARC
21/01/2021 UCY BP-01 273138 SIKA 204 12.60 33003 C3S2 -ARC
21/01/2021 UCY BP-01 273139 CEMENT 1.05 33003 C3S1-ARC
21/01/2021 UCY BP-01 273140 SAND 2.10 33003 C3S1-ARC
21/01/2021 UCY BP-01 273141 STONE 2.58 33003 C3S1-ARC
21/01/2021 UCY BP-01 273142 SIKA 204 10.50 33003 C3S1-ARC
21/01/2021 UCY BP-02 273143 CEMENT 7.96 S4000 C3S4-SUB
21/01/2021 UCY BP-02 273144 SAND 15.30 S4000 C3S4-SUB
21/01/2021 UCY BP-02 273145 STONE 16.84 S4000 C3S4-SUB
21/01/2021 UCY BP-02 273146 SIKA 204 74.75 S4000 C3S4-SUB
21/01/2021 UCY BP-02 273147 CEMENT 3.80 28003 C3ML-SUB
21/01/2021 UCY BP-02 273148 SAND 8.00 28003 C3ML-SUB
21/01/2021 UCY BP-02 273149 STONE 8.82 28003 C3ML-SUB
21/01/2021 UCY BP-02 273150 SIKA 204 35.70 28003 C3ML-SUB
21/01/2021 UCY BP-02 273151 CEMENT 0.92 26100 C3ML-SUB
21/01/2021 UCY BP-02 273152 SAND 1.69 26100 C3ML-SUB
21/01/2021 UCY BP-02 273153 STONE 2.07 26100 C3ML-SUB
21/01/2021 UCY BP-02 273154 SIKA 204 9.20 26100 C3ML-SUB
21/01/2021 UCY BP-01 - CEMENT 18.04 CP-07
21/01/2021 UCY BP-01 - SAND 36.34 CP-07
21/01/2021 UCY BP-01 - STONE 45.85 CP-07
21/01/2021 UCY BP-01 - SIKA 204 198.44 CP-07
21/01/2021 UCY BP-02 - CEMENT 1.64 CP-07
21/01/2021 UCY BP-02 - SAND 3.31 CP-07
21/01/2021 UCY BP-02 - STONE 4.17 CP-07
21/01/2021 UCY BP-02 - SIKA 204 18.04 CP-07
21/01/2021 UCY BP-01 - CEMENT 41.82 CP-0602
21/01/2021 UCY BP-01 - SAND 75.45 CP-0602
21/01/2021 UCY BP-01 - STONE 96.67 CP-0602
21/01/2021 UCY BP-01 - SIKA 3006 ES 246.84 CP-0602

Record BY Check by
Operator Plant Engineer

Check by
Engineer THAI
RECORDER
CEMENT 104.315 tons
SAND 199.36 tons
STONE 245.07 tons
SIKA 204 544.63 kg
SIKA 3006 ES 299.83 kg

UCY BP-01 UCY BP-02 total


CEMENT 89.995 14.32 104.315 tons
SAND 171.06 28.3 199.36 tons
STONE 213.17 31.9 245.07 tons
SIKA 204 406.94 137.69 544.63 kg
SIKA 3006 ES 299.83 0 299.83 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 41.82 0 41.82 tons
SAND 75.45 0 75.45 tons
STONE 96.67 0 96.67 tons
SIKA 204 0 0 0 kg
SIKA 3006 ES 246.84 0 246.84 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 18.04 1.64 19.68 tons
SAND 36.34 3.31 39.65 tons
STONE 45.85 4.17 50.02 tons
SIKA 204 198.44 18.04 216.48 kg
SIKA 3006 ES 0 0 0 kg

CP-03&04

UCY BP-01 UCY BP-02 total


CEMENT 30.135 12.68 42.815 tons
SAND 59.27 24.99 84.26 tons
STONE 70.65 27.73 98.38 tons
SIKA 204 208.5 119.65 328.15 kg
SIKA 3006 ES 52.99 0 52.99 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
UCY BP 22/01/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
22/01/2021 UCY BP-01 273155 CEMENT 5.06 20103 TRAFFICAM
22/01/2021 UCY BP-01 273156 SAND 9.22 20103 TRAFFICAM
22/01/2021 UCY BP-01 273157 STONE 11.37 20103 TRAFFICAM
22/01/2021 UCY BP-01 273158 SIKA 3006 ES 30.36 20103 TRAFFICAM
22/01/2021 UCY BP-01 273159 CEMENT 16.38 S6000 C3S3 SUB
22/01/2021 UCY BP-01 273160 SAND 32.95 S6000 C3S3 SUB
22/01/2021 UCY BP-01 273161 STONE 40.17 S6000 C3S3 SUB
22/01/2021 UCY BP-01 273162 SIKA 204 163.80 S6000 C3S3 SUB
22/01/2021 UCY BP-01 273163 CEMENT 13.44 S4000 C4S5-SUB
22/01/2021 UCY BP-01 273164 SAND 27.04 S4000 C4S5-SUB
22/01/2021 UCY BP-01 273165 STONE 32.96 S4000 C4S5-SUB
22/01/2021 UCY BP-01 273166 SIKA 204 134.40 S4000 C4S5-SUB
22/01/2021 UCY BP-02 273167 CEMENT 2.96 S4000 C3S1- SUB
22/01/2021 UCY BP-02 273168 SAND 6.29 S4000 C3S1- SUB
22/01/2021 UCY BP-02 273169 STONE 6.71 S4000 C3S1- SUB
22/01/2021 UCY BP-02 273170 SIKA 204 27.30 S4000 C3S1- SUB
22/01/2021 UCY BP-02 273171 CEMENT 4.88 28003 C3ML-SUB
22/01/2021 UCY BP-02 273172 SAND 10.52 28003 C3ML-SUB
22/01/2021 UCY BP-02 273173 STONE 11.85 28003 C3ML-SUB
22/01/2021 UCY BP-02 273174 SIKA 204 48.30 28003 C3ML-SUB
22/01/2021 UCY BP-02 273175 CEMENT 13.67 S6000 C3S3 SUB
22/01/2021 UCY BP-02 273176 SAND 27.84 S6000 C3S3 SUB
22/01/2021 UCY BP-02 273177 STONE 32.96 S6000 C3S3 SUB
22/01/2021 UCY BP-02 273178 SIKA 204 134.40 S6000 C3S3 SUB
22/01/2021 UCY BP-02 273179 CEMENT 3.13 S4000 C3S4-SUB
22/01/2021 UCY BP-02 273180 SAND 6.02 S4000 C3S4-SUB
22/01/2021 UCY BP-02 273181 STONE 6.46 S4000 C3S4-SUB
22/01/2021 UCY BP-02 273182 SIKA 204 28.75 S4000 C3S4-SUB
22/01/2021 UCY BP-02 273183 CEMENT 2.53 26100 C3ML-SUB
22/01/2021 UCY BP-02 273184 SAND 4.61 26100 C3ML-SUB
22/01/2021 UCY BP-02 273185 STONE 5.69 26100 C3ML-SUB
22/01/2021 UCY BP-02 273186 SIKA 204 25.30 26100 C3ML-SUB
22/01/2021 UCY BP-02 273187 CEMENT 0.69 28006 C3ML-SUB
22/01/2021 UCY BP-02 273188 SAND 1.26 28006 C3ML-SUB
22/01/2021 UCY BP-02 273189 STONE 1.55 28006 C3ML-SUB
22/01/2021 UCY BP-02 273190 SIKA 204 6.90 28006 C3ML-SUB
22/01/2021 UCY BP-02 273191 CEMENT 1.26 33003 C3S3-ARC
22/01/2021 UCY BP-02 273192 SAND 2.54 33003 C3S3-ARC
22/01/2021 UCY BP-02 273193 STONE 3.09 33003 C3S3-ARC
22/01/2021 UCY BP-02 273194 SIKA 204 12.60 33003 C3S3-ARC
22/01/2021 UCY BP-02 273195 CEMENT 15.12 S4000 C4S5-SUB
22/01/2021 UCY BP-02 273196 SAND 30.42 S4000 C4S5-SUB
22/01/2021 UCY BP-02 273197 STONE 37.08 S4000 C4S5-SUB
22/01/2021 UCY BP-02 273198 SIKA 204 151.20 S4000 C4S5-SUB

Record BY Check by
Operator Plant Engineer

Check by
Engineer THAI
RECORDER
CEMENT 79.12 tons
SAND 158.71 tons
STONE 189.89 tons
SIKA 204 732.95 kg
SIKA 3006 ES 30.36 kg

UCY BP-01 UCY BP-02 total


CEMENT 34.88 44.24 79.12 tons
SAND 69.21 89.5 158.71 tons
STONE 84.5 105.39 189.89 tons
SIKA 204 298.2 434.75 732.95 kg
SIKA 3006 ES 30.36 0 30.36 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 0 0 0 tons
SAND 0 0 0 tons
STONE 0 0 0 tons
SIKA 204 0 0 0 kg
SIKA 3006 ES 0 0 0 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 0 0 0 tons
SAND 0 0 0 tons
STONE 0 0 0 tons
SIKA 204 0 0 0 kg
SIKA 3006 ES 0 0 0 kg

CP-03&04

UCY BP-01 UCY BP-02 total


CEMENT 34.88 44.24 79.12 tons
SAND 69.21 89.5 158.71 tons
STONE 84.5 105.39 189.89 tons
SIKA 204 298.2 434.75 732.95 kg
SIKA 3006 ES 30.36 0 30.36 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
UCY BP 23/01/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
23/01/2021 UCY BP-01 274301 CEMENT 8.54 S4000 C3S4-SUB
23/01/2021 UCY BP-01 274302 SAND 16.73 S4000 C3S4-SUB
23/01/2021 UCY BP-01 274303 STONE 18.66 S4000 C3S4-SUB
23/01/2021 UCY BP-01 274304 SIKA 204 82.10 S4000 C3S4-SUB
23/01/2021 UCY BP-01 274305 CEMENT 7.91 20103 TRAFFICM
23/01/2021 UCY BP-01 274306 SAND 14.45 20103 TRAFFICM
23/01/2021 UCY BP-01 274307 STONE 17.78 20103 TRAFFICM
23/01/2021 UCY BP-01 274308 SIKA 3006 ES 47.47 20103 TRAFFICM
23/01/2021 UCY BP-01 274309 CEMENT 1.26 28001 SP-A-SUP
23/01/2021 UCY BP-01 274310 SAND 2.53 28001 SP-A-SUP
23/01/2021 UCY BP-01 274311 STONE 3.11 28001 SP-A-SUP
23/01/2021 UCY BP-01 274312 SIKA 204 12.60 28001 SP-A-SUP
23/01/2021 UCY BP-02 274313 CEMENT 6.53 28003 C3ML-SUB
23/01/2021 UCY BP-02 274314 SAND 13.46 28003 C3ML-SUB
23/01/2021 UCY BP-02 274315 STONE 15.51 28003 C3ML-SUB
23/01/2021 UCY BP-02 274316 SIKA 204 63.00 28003 C3ML-SUB
23/01/2021 UCY BP-02 274317 CEMENT 5.74 S4000 C3S4-SUB
23/01/2021 UCY BP-02 274318 SAND 11.32 S4000 C3S4-SUB
23/01/2021 UCY BP-02 274319 STONE 12.92 S4000 C3S4-SUB
23/01/2021 UCY BP-02 274320 SIKA 204 55.10 S4000 C3S4-SUB
23/01/2021 UCY BP-02 274321 CEMENT 1.26 33003 C3S2-ARC
23/01/2021 UCY BP-02 274322 SAND 2.53 33003 C3S2-ARC
23/01/2021 UCY BP-02 274323 STONE 3.10 33003 C3S2-ARC
23/01/2021 UCY BP-02 274324 SIKA 204 12.60 33003 C3S2-ARC
23/01/2021 UCY BP-02 274325 CEMENT 1.34 33003 C3S3-ARC
23/01/2021 UCY BP-02 274326 SAND 2.70 33003 C3S3-ARC
23/01/2021 UCY BP-02 274327 STONE 3.30 33003 C3S3-ARC
23/01/2021 UCY BP-02 274328 SIKA 204 13.44 33003 C3S3-ARC
23/01/2021 UCY BP-01 - CEMENT 78.31 CP-07
23/01/2021 UCY BP-01 - SAND 157.38 CP-07
23/01/2021 UCY BP-01 - STONE 199.40 CP-07
23/01/2021 UCY BP-01 - SIKA 204 861.41 CP-07
23/01/2021 UCY BP-01 - CEMENT 21.65 CP-0602
23/01/2021 UCY BP-01 - SAND 39.95 CP-0602
23/01/2021 UCY BP-01 - STONE 50.74 CP-0602
23/01/2021 UCY BP-01 - SIKA 3006 ES 123.79 CP-0602
23/01/2021 UCY BP-02 - CEMENT 50.37 CP-0602
23/01/2021 UCY BP-02 - SAND 90.12 CP-0602
23/01/2021 UCY BP-02 - STONE 114.98 CP-0602
23/01/2021 UCY BP-02 - SIKA 3006 ES 302.22 CP-0602
Record BY Check by
Operator Plant Engineer

Check by
Engineer THAI
RECORDER
CEMENT 182.91 tons
SAND 351.17 tons
STONE 439.50 tons
SIKA 204 1100.25 kg
SIKA 3006 ES 473.48 kg

UCY BP-01 UCY BP-02 total


CEMENT 117.67 65.24 182.91 tons
SAND 231.04 120.13 351.17 tons
STONE 289.69 149.81 439.5 tons
SIKA 204 956.11 144.14 1100.25 kg
SIKA 3006 ES 171.26 302.22 473.48 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 21.65 50.37 72.02 tons
SAND 39.95 90.12 130.07 tons
STONE 50.74 114.98 165.72 tons
SIKA 204 0 0 0 kg
SIKA 3006 ES 123.79 302.22 426.01 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 78.31 0 78.31 tons
SAND 157.38 0 157.38 tons
STONE 199.4 0 199.4 tons
SIKA 204 861.41 0 861.41 kg
SIKA 3006 ES 0 0 0 kg

CP-03&04

UCY BP-01 UCY BP-02 total


CEMENT 17.71 14.87 32.58 tons
SAND 33.71 30.01 63.72 tons
STONE 39.55 34.83 74.38 tons
SIKA 204 94.7 144.14 238.84 kg
SIKA 3006 ES 47.47 0 47.47 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
UCY BP 24/01/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
24/01/2021 UCY BP-01 274329 CEMENT 5.98 S4000 C3S4-SUB
24/01/2021 UCY BP-01 274330 SAND 11.29 S4000 C3S4-SUB
24/01/2021 UCY BP-01 274331 STONE 12.95 S4000 C3S4-SUB
24/01/2021 UCY BP-01 274332 SIKA 204 57.50 S4000 C3S4-SUB
24/01/2021 UCY BP-02 274333 CEMENT 7.91 20103 TRAFFICM
24/01/2021 UCY BP-02 274334 SAND 14.38 20103 TRAFFICM
24/01/2021 UCY BP-02 274335 STONE 17.82 20103 TRAFFICM
24/01/2021 UCY BP-02 274336 SIKA 3006 ES 47.47 20103 TRAFFICM
24/01/2021 UCY BP-02 274337 CEMENT 0.92 28006 C3ML-SUB
24/01/2021 UCY BP-02 274338 SAND 1.67 28006 C3ML-SUB
24/01/2021 UCY BP-02 274339 STONE 2.07 28006 C3ML-SUB
24/01/2021 UCY BP-02 274340 SIKA 204 9.20 28006 C3ML-SUB
24/01/2021 UCY BP-02 274341 CEMENT 0.21 S4000 C3S2-SUB
24/01/2021 UCY BP-02 274342 SAND 0.42 S4000 C3S2-SUB
24/01/2021 UCY BP-02 274343 STONE 0.52 S4000 C3S2-SUB
24/01/2021 UCY BP-02 274344 SIKA 204 2.10 S4000 C3S2-SUB
24/01/2021 UCY BP-02 274345 CEMENT 0.63 33003 C3S4-ARC
24/01/2021 UCY BP-02 274346 SAND 1.26 33003 C3S4-ARC
24/01/2021 UCY BP-02 274347 STONE 1.55 33003 C3S4-ARC
24/01/2021 UCY BP-02 274348 SIKA 204 6.30 33003 C3S4-ARC
24/01/2021 UCY BP-02 274349 CEMENT 1.68 33003 C3S3-ARC
24/01/2021 UCY BP-02 274350 SAND 3.36 33003 C3S3-ARC
24/01/2021 UCY BP-02 274351 STONE 4.14 33003 C3S3-ARC
24/01/2021 UCY BP-02 274352 SIKA 204 16.80 33003 C3S3-ARC
24/01/2021 UCY BP-02 274353 CEMENT 1.05 33003 C3S1-ARC
24/01/2021 UCY BP-02 274354 SAND 2.10 33003 C3S1-ARC
24/01/2021 UCY BP-02 274355 STONE 2.59 33003 C3S1-ARC
24/01/2021 UCY BP-02 274356 SIKA 204 10.50 33003 C3S1-ARC
24/01/2021 UCY BP-01 - CEMENT 23.37 CP-07
24/01/2021 UCY BP-01 - SAND 47.31 CP-07
24/01/2021 UCY BP-01 - STONE 59.45 CP-07
24/01/2021 UCY BP-01 - SIKA 204 257.07 CP-07
24/01/2021 UCY BP-02 - CEMENT 3.28 CP-07
24/01/2021 UCY BP-02 - SAND 6.53 CP-07
24/01/2021 UCY BP-02 - STONE 8.34 CP-07
24/01/2021 UCY BP-02 - SIKA 204 36.08 CP-07
24/01/2021 UCY BP-02 - CEMENT 58.06 CP-0602
24/01/2021 UCY BP-02 - SAND 104.27 CP-0602
24/01/2021 UCY BP-02 - STONE 133.89 CP-0602
24/01/2021 UCY BP-02 - SIKA 3006 ES 344.27 CP-0602
Record BY Check by
Operator Plant Engineer

Check by
Engineer THAI
RECORDER
CEMENT 103.09 tons
SAND 192.59 tons
STONE 243.32 tons
SIKA 204 395.55 kg
SIKA 3006 ES 391.74 kg

UCY BP-01 UCY BP-02 total


CEMENT 29.35 73.74 103.09 tons
SAND 58.6 133.99 192.59 tons
STONE 72.4 170.92 243.32 tons
SIKA 204 314.57 80.98 395.55 kg
SIKA 3006 ES 0 391.74 391.74 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 0 58.06 58.06 tons
SAND 0 104.27 104.27 tons
STONE 0 133.89 133.89 tons
SIKA 204 0 0 0 kg
SIKA 3006 ES 0 344.27 344.27 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 23.37 3.28 26.65 tons
SAND 47.31 6.53 53.84 tons
STONE 59.45 8.34 67.79 tons
SIKA 204 257.07 36.08 293.15 kg
SIKA 3006 ES 0 0 0 kg

CP-03&04

UCY BP-01 UCY BP-02 total


CEMENT 5.98 12.4 18.38 tons
SAND 11.29 23.19 34.48 tons
STONE 12.95 28.69 41.64 tons
SIKA 204 57.5 44.9 102.4 kg
SIKA 3006 ES 0 47.47 47.47 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
UCY BP 25/01/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
25/01/2021 UCY BP-01 274357 CEMENT 1.91 28003 C3ML-SUB
25/01/2021 UCY BP-01 274358 SAND 4.17 28003 C3ML-SUB
25/01/2021 UCY BP-01 274359 STONE 4.14 28003 C3ML-SUB
25/01/2021 UCY BP-01 274360 SIKA 204 16.80 28003 C3ML-SUB
25/01/2021 UCY BP-02 274361 CEMENT 7.56 28003 C3ML-SUB
25/01/2021 UCY BP-02 274362 SAND 15.17 28003 C3ML-SUB
25/01/2021 UCY BP-02 274363 STONE 18.61 28003 C3ML-SUB
25/01/2021 UCY BP-02 274364 SIKA 204 75.60 28003 C3ML-SUB
25/01/2021 UCY BP-02 274365 CEMENT 1.47 33003 C3S2-ARC
25/01/2021 UCY BP-02 274366 SAND 2.95 33003 C3S2-ARC
25/01/2021 UCY BP-02 274367 STONE 3.62 33003 C3S2-ARC
25/01/2021 UCY BP-02 274368 SIKA 204 14.70 33003 C3S2-ARC
25/01/2021 UCY BP-02 274369 CEMENT 21.16 S4000 C3S4-SUB
25/01/2021 UCY BP-02 274370 SAND 38.55 S4000 C3S4-SUB
25/01/2021 UCY BP-02 274371 STONE 47.56 S4000 C3S4-SUB
25/01/2021 UCY BP-02 274372 SIKA 204 211.60 S4000 C3S4-SUB
25/01/2021 UCY BP-02 274373 CEMENT 2.07 26102 C3ML-SUB
25/01/2021 UCY BP-02 274374 SAND 3.77 26102 C3ML-SUB
25/01/2021 UCY BP-02 274375 STONE 4.65 26102 C3ML-SUB
25/01/2021 UCY BP-02 274376 SIKA 204 20.70 26102 C3ML-SUB
25/01/2021 UCY BP-02 274377 CEMENT 1.15 28006 C3ML-SUB
25/01/2021 UCY BP-02 274378 SAND 2.10 28006 C3ML-SUB
25/01/2021 UCY BP-02 274379 STONE 2.59 28006 C3ML-SUB
25/01/2021 UCY BP-02 274380 SIKA 204 11.50 28006 C3ML-SUB
25/01/2021 UCY BP-02 274381 CEMENT 1.29 28001 SP-A-SUP
25/01/2021 UCY BP-02 274382 SAND 2.35 28001 SP-A-SUP
25/01/2021 UCY BP-02 274383 STONE 2.90 28001 SP-A-SUP
25/01/2021 UCY BP-02 274384 SIKA 3006 ES 7.73 28001 SP-A-SUP
25/01/2021 UCY BP-02 274385 CEMENT 2.45 24000 C4ML-SUB
25/01/2021 UCY BP-02 274386 SAND 3.92 24000 C4ML-SUB
25/01/2021 UCY BP-02 274387 STONE 5.18 24000 C4ML-SUB
25/01/2021 UCY BP-02 274388 SIKA 204 29.40 24000 C4ML-SUB
25/01/2021 UCY BP-02 274389 CEMENT 7.05 20103 TRAFFICM
25/01/2021 UCY BP-02 274390 SAND 15.14 20103 TRAFFICM
25/01/2021 UCY BP-02 274391 STONE 18.08 20103 TRAFFICM
25/01/2021 UCY BP-02 274392 SIKA 204 63.47 20103 TRAFFICM
25/01/2021 UCY BP-02 274393 CEMENT 0.25 S4000 C3S4-SUB
25/01/2021 UCY BP-02 274394 SAND 0.78 S4000 C3S4-SUB
25/01/2021 UCY BP-02 274395 SIKA 204 1.50 S4000 C3S4-SUB
25/01/2021 UCY BP-02 274396 CEMENT 0.48 S4000 C3S4-SUB
25/01/2021 UCY BP-02 274397 SAND 1.58 S4000 C3S4-SUB
25/01/2021 UCY BP-02 274398 SIKA 204 1.50 S4000 C3S4-SUB
25/01/2021 UCY BP-01 - CEMENT 11.69 CP-07
25/01/2021 UCY BP-01 - SAND 23.37 CP-07
25/01/2021 UCY BP-01 - STONE 29.61 CP-07
25/01/2021 UCY BP-01 - SIKA 204 128.54 CP-07
25/01/2021 UCY BP-02 - CEMENT 21.73 CP-07
25/01/2021 UCY BP-02 - SAND 43.94 CP-07
25/01/2021 UCY BP-02 - STONE 55.23 CP-07
25/01/2021 UCY BP-02 - SIKA 204 239.03 CP-07
25/01/2021 UCY BP-01 - CEMENT 54.97 CP-0602
25/01/2021 UCY BP-01 - SAND 97.99 CP-0602
25/01/2021 UCY BP-01 - STONE 125.83 CP-0602
25/01/2021 UCY BP-01 - SIKA 3006 ES 329.82 CP-0602
25/01/2021 UCY BP-02 - CEMENT 4.56 CP-0602
25/01/2021 UCY BP-02 - SAND 8.89 CP-0602
25/01/2021 UCY BP-02 - STONE 11.29 CP-0602
25/01/2021 UCY BP-02 - SIKA 3006 ES 23.28 CP-0602

Record BY Check by
Operator Plant Engineer

Check by
Engineer THAI
RECORDER
CEMENT 139.79 tons
SAND 264.67 tons
STONE 329.29 tons
SIKA 204 814.34 kg
SIKA 3006 ES 360.83 kg

UCY BP-01 UCY BP-02 total


CEMENT 68.57 71.22 139.79 tons
SAND 125.53 139.14 264.67 tons
STONE 159.58 169.71 329.29 tons
SIKA 204 145.34 669 814.34 kg
SIKA 3006 ES 329.82 31.01 360.83 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 54.97 4.56 59.53 tons
SAND 97.99 8.89 106.88 tons
STONE 125.83 11.29 137.12 tons
SIKA 204 0 0 0 kg
SIKA 3006 ES 329.82 23.28 353.1 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 11.69 21.73 33.42 tons
SAND 23.37 43.94 67.31 tons
STONE 29.61 55.23 84.84 tons
SIKA 204 128.54 239.03 367.57 kg
SIKA 3006 ES 0 0 0 kg

CP-03&04

UCY BP-01 UCY BP-02 total


CEMENT 1.91 44.93 46.84 tons
SAND 4.17 86.31 90.48 tons
STONE 4.14 103.19 107.33 tons
SIKA 204 16.8 429.97 446.77 kg
SIKA 3006 ES 0 7.73 7.73 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
UCY BP 26/01/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
26/01/2021 UCY BP-01 274001 CEMENT 7.05 20103 TRAFFICAM
26/01/2021 UCY BP-01 274002 SAND 14.50 20103 TRAFFICAM
26/01/2021 UCY BP-01 274003 STONE 18.04 20103 TRAFFICAM
26/01/2021 UCY BP-01 274004 SIKA 204 63.47 20103 TRAFFICAM
26/01/2021 UCY BP-01 274005 CEMENT 0.69 28001 SP-A-SUP
26/01/2021 UCY BP-01 274006 SAND 1.26 28001 SP-A-SUP
26/01/2021 UCY BP-01 274007 STONE 1.55 28001 SP-A-SUP
26/01/2021 UCY BP-01 274008 SIKA 3006 ES 4.14 28001 SP-A-SUP
26/01/2021 UCY BP-01 274009 CEMENT 0.48 S4000 C3S2 SUB
26/01/2021 UCY BP-01 274010 SAND 1.59 S4000 C3S2 SUB
26/01/2021 UCY BP-01 274011 SIKA 204 1.50 S4000 C3S2 SUB
26/01/2021 UCY BP-01 274012 CEMENT 0.23 28003 C3ML-SUB
26/01/2021 UCY BP-01 274013 SAND 0.80 28003 C3ML-SUB
26/01/2021 UCY BP-01 274014 CEMENT 2.52 S4000 C3S2 -SUB
26/01/2021 UCY BP-01 274015 SAND 5.09 S4000 C3S2 -SUB
26/01/2021 UCY BP-01 274016 STONE 6.22 S4000 C3S2 -SUB
26/01/2021 UCY BP-01 274017 SIKA 204 25.20 S4000 C3S2 -SUB
26/01/2021 UCY BP-01 274018 CEMENT 4.83 28003 C3ML-SUB
26/01/2021 UCY BP-01 274019 SAND 9.76 28003 C3ML-SUB
26/01/2021 UCY BP-01 274020 STONE 11.91 28003 C3ML-SUB
26/01/2021 UCY BP-01 274021 SIKA 204 48.30 28003 C3ML-SUB
26/01/2021 UCY BP-01 274022 CEMENT 13.65 S4000 C4S5-SUB
26/01/2021 UCY BP-01 274023 SAND 27.59 S4000 C4S5-SUB
26/01/2021 UCY BP-01 274024 STONE 33.67 S4000 C4S5-SUB
26/01/2021 UCY BP-01 274025 SIKA 204 136.50 S4000 C4S5-SUB
26/01/2021 UCY BP-02 274026 CEMENT 1.17 S4000 C3S1-SUB
26/01/2021 UCY BP-02 274027 SAND 2.85 S4000 C3S1-SUB
26/01/2021 UCY BP-02 274028 STONE 1.55 S4000 C3S1-SUB
26/01/2021 UCY BP-02 274029 O-BASF 8320 4.20 S4000 C3S1-SUB
26/01/2021 UCY BP-02 274030 SIKA 204 4.20 S4000 C3S1-SUB
26/01/2021 UCY BP-02 274031 CEMENT 0.92 26101 C3ML-SUB
26/01/2021 UCY BP-02 274032 SAND 1.68 26101 C3ML-SUB
26/01/2021 UCY BP-02 274033 STONE 2.06 26101 C3ML-SUB
26/01/2021 UCY BP-02 274034 O-BASF 8320 4.60 26101 C3ML-SUB
26/01/2021 UCY BP-02 274035 SIKA 204 4.60 26101 C3ML-SUB
26/01/2021 UCY BP-02 274036 CEMENT 0.84 33003 C3SB-ARC
26/01/2021 UCY BP-02 274037 SAND 1.70 33003 C3SB-ARC
26/01/2021 UCY BP-02 274038 STONE 2.07 33003 C3SB-ARC
26/01/2021 UCY BP-02 274039 O-BASF 8320 4.20 33003 C3SB-ARC
26/01/2021 UCY BP-02 274040 SIKA 204 4.20 33003 C3SB-ARC
26/01/2021 UCY BP-02 274041 CEMENT 32.13 S4000 C4S5-SUB
26/01/2021 UCY BP-02 274042 SAND 64.95 S4000 C4S5-SUB
26/01/2021 UCY BP-02 274043 STONE 79.25 S4000 C4S5-SUB
26/01/2021 UCY BP-02 274044 O-BASF 8320 160.65 S4000 C4S5-SUB
26/01/2021 UCY BP-02 274045 SIKA 204 160.65 S4000 C4S5-SUB
26/01/2021 UCY BP-01 - CEMENT 22.35 CP-07
26/01/2021 UCY BP-01 - SAND 44.91 CP-07
26/01/2021 UCY BP-01 - STONE 56.41 CP-07
26/01/2021 UCY BP-01 - SIKA 204 245.80 CP-07
26/01/2021 UCY BP-01 - CEMENT 40.62 CP-0602
26/01/2021 UCY BP-01 - SAND 73.35 CP-0602
26/01/2021 UCY BP-01 - STONE 93.68 CP-0602
26/01/2021 UCY BP-01 - SIKA 3006 ES 239.66 CP-0602

Record BY Check by
Operator Plant Engineer

Check by
Engineer THAI
RECORDER
CEMENT 127.475 tons
SAND 250.03 tons
STONE 306.41 tons
SIKA 204 694.42 kg
SIKA 3006 ES 243.80 kg
O-BASF 8320 173.65 kg

UCY BP-01 UCY BP-02 total


CEMENT 92.415 35.06 127.475 tons
SAND 178.85 71.18 250.03 tons
STONE 221.48 84.93 306.41 tons
SIKA 204 520.77 173.65 694.42 kg
SIKA 3006 ES 243.8 0 243.8 kg
O-BASF 8320 0 173.65 173.65 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 40.62 0 40.62 tons
SAND 73.35 0 73.35 tons
STONE 93.68 0 93.68 tons
SIKA 204 0 0 0 kg
SIKA 3006 ES 239.66 0 239.66 kg
O-BASF 8320 0 0 0 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 22.35 0 22.35 tons
SAND 44.91 0 44.91 tons
STONE 56.41 0 56.41 tons
SIKA 204 245.8 0 245.8 kg
SIKA 3006 ES 0 0 0 kg
O-BASF 8320 0 0 0 kg

CP-03&04
UCY BP-01 UCY BP-02 total
CEMENT 29.445 35.06 64.505 tons
SAND 60.59 71.18 131.77 tons
STONE 71.39 84.93 156.32 tons
SIKA 204 274.97 173.65 448.62 kg
SIKA 3006 ES 4.14 0 4.14 kg
O-BASF 8320 0 173.65 173.65 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 27/01/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
27/01/2021 UCY BP-01 274046 CEMENT 8.86 28003 C3ML-SUB
27/01/2021 UCY BP-01 274047 SAND 18.40 28003 C3ML-SUB
27/01/2021 UCY BP-01 274048 STONE 20.78 28003 C3ML-SUB
27/01/2021 UCY BP-01 274049 SIKA 204 84.00 28003 C3ML-SUB
27/01/2021 UCY BP-01 274050 CEMENT 2.75 S4000 C3S1-SUB
27/01/2021 UCY BP-01 274051 SAND 5.84 S4000 C3S1-SUB
27/01/2021 UCY BP-01 274052 STONE 6.23 S4000 C3S1-SUB
27/01/2021 UCY BP-01 274053 SIKA 204 25.20 S4000 C3S1-SUB
27/01/2021 UCY BP-01 274054 CEMENT 1.05 S4000 C3S4-SUB
27/01/2021 UCY BP-01 274055 SAND 2.10 S4000 C3S4-SUB
27/01/2021 UCY BP-01 274056 STONE 2.60 S4000 C3S4-SUB
27/01/2021 UCY BP-01 274057 SIKA 204 10.50 S4000 C3S4-SUB
27/01/2021 UCY BP-01 274058 CEMENT 19.11 S4000 C4S7-SUB
27/01/2021 UCY BP-01 274059 SAND 38.22 S4000 C4S7-SUB
27/01/2021 UCY BP-01 274060 STONE 47.28 S4000 C4S7-SUB
27/01/2021 UCY BP-01 274061 SIKA 204 191.10 S4000 C4S7-SUB
27/01/2021 UCY BP-02 274062 CEMENT 4.96 S4000 C3S1-SUB
27/01/2021 UCY BP-02 274063 SAND 12.50 S4000 C3S1-SUB
27/01/2021 UCY BP-02 274064 STONE 14.70 S4000 C3S1-SUB
27/01/2021 UCY BP-02 274065 O-BASF 8320 31.80 S4000 C3S1-SUB
27/01/2021 UCY BP-02 274066 SIKA 204 34.35 S4000 C3S1-SUB
27/01/2021 UCY BP-02 274067 CEMENT 7.05 20103 TRAFFICAM
27/01/2021 UCY BP-02 274068 SAND 15.14 20103 TRAFFICAM
27/01/2021 UCY BP-02 274069 STONE 18.06 20103 TRAFFICAM
27/01/2021 UCY BP-02 274070 O-BASF 8320 35.67 20103 TRAFFICAM
27/01/2021 UCY BP-02 274071 SIKA 204 27.80 20103 TRAFFICAM
27/01/2021 UCY BP-02 274072 CEMENT 13.65 S4000 C4S7-SUB
27/01/2021 UCY BP-02 274073 SAND 27.30 S4000 C4S7-SUB
27/01/2021 UCY BP-02 274074 STONE 33.77 S4000 C4S7-SUB
27/01/2021 UCY BP-02 274075 O-BASF 8320 129.93 S4000 C4S7-SUB
27/01/2021 UCY BP-02 274076 SIKA 204 6.57 S4000 C4S7-SUB
27/01/2021 UCY BP-02 274077 CEMENT 0.46 28006 C3ML-SUB
27/01/2021 UCY BP-02 274078 SAND 0.84 28006 C3ML-SUB
27/01/2021 UCY BP-02 274079 STONE 1.04 28006 C3ML-SUB
27/01/2021 UCY BP-02 274080 O-BASF 8320 2.30 28006 C3ML-SUB
27/01/2021 UCY BP-02 274081 SIKA 204 2.30 28006 C3ML-SUB
27/01/2021 UCY BP-02 274082 CEMENT 1.38 26101 C3ML-SUB
27/01/2021 UCY BP-02 274083 SAND 2.51 26101 C3ML-SUB
27/01/2021 UCY BP-02 274084 STONE 3.12 26101 C3ML-SUB
27/01/2021 UCY BP-02 274085 O-BASF 8320 6.90 26101 C3ML-SUB
27/01/2021 UCY BP-02 274086 SIKA 204 6.90 26101 C3ML-SUB
27/01/2021 UCY BP-02 274087 CEMENT 3.68 S4000 C3S4-SUB
27/01/2021 UCY BP-02 274088 SAND 6.69 S4000 C3S4-SUB
27/01/2021 UCY BP-02 274089 STONE 8.32 S4000 C3S4-SUB
27/01/2021 UCY BP-02 274090 O-BASF 8320 18.40 S4000 C3S4-SUB
27/01/2021 UCY BP-02 274091 SIKA 204 18.40 S4000 C3S4-SUB
27/01/2021 UCY BP-02 - CEMENT 20.50 CP-07
27/01/2021 UCY BP-02 - SAND 41.65 CP-07
27/01/2021 UCY BP-02 - STONE 52.30 CP-07
27/01/2021 UCY BP-02 - SIKA 204 225.50 CP-07
27/01/2021 UCY BP-01 - CEMENT 44.17 CP-0602
27/01/2021 UCY BP-01 - SAND 79.68 CP-0602
27/01/2021 UCY BP-01 - STONE 101.77 CP-0602
27/01/2021 UCY BP-01 - SIKA 3006 ES 260.92 CP-0602

Record BY Check by
Operator Plant Engineer

Check by
Engineer THAI
RECORDER
CEMENT 127.62 tons
SAND 250.87 tons
STONE 309.97 tons
SIKA 204 632.62 kg
SIKA 3006 ES 260.92 kg
O-BASF 8320 225.00 kg

UCY BP-01 UCY BP-02 total


CEMENT 75.94 51.68 127.62 tons
SAND 144.24 106.63 250.87 tons
STONE 178.66 131.31 309.97 tons
SIKA 204 310.8 321.82 632.62 kg
SIKA 3006 ES 260.92 0 260.92 kg
O-BASF 8320 0 225 225 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 44.17 0 44.17 tons
SAND 79.68 0 79.68 tons
STONE 101.77 0 101.77 tons
SIKA 204 0 0 0 kg
SIKA 3006 ES 260.92 0 260.92 kg
O-BASF 8320 0 0 0 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 0 20.5 20.5 tons
SAND 0 41.65 41.65 tons
STONE 0 52.3 52.3 tons
SIKA 204 0 225.5 225.5 kg
SIKA 3006 ES 0 0 0 kg
O-BASF 8320 0 0 0 kg

CP-03&04
UCY BP-01 UCY BP-02 total
CEMENT 31.77 31.18 62.95 tons
SAND 64.56 64.98 129.54 tons
STONE 76.89 79.01 155.9 tons
SIKA 204 310.8 96.32 407.12 kg
SIKA 3006 ES 0 0 0 kg
O-BASF 8320 0 225 225 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 28/01/2021
Summary RQ
DATE Plant RQ NO Material QTY
28/01/2021 UCY BP-01 274092 CEMENT 12.66
28/01/2021 UCY BP-01 274093 SAND 31.61
28/01/2021 UCY BP-01 274094 STONE 38.70
28/01/2021 UCY BP-01 274095 SIKA 204 173.95
28/01/2021 UCY BP-01 274096 SIKA LATEX POWER 248.50
28/01/2021 UCY BP-01 274097 CEMENT 9.72
28/01/2021 UCY BP-01 274098 SAND 18.65
28/01/2021 UCY BP-01 274099 STONE 20.17
28/01/2021 UCY BP-01 274100 SIKA 204 94.20
28/01/2021 UCY BP-01 274401 CEMENT 1.38
28/01/2021 UCY BP-01 274402 SAND 2.51
28/01/2021 UCY BP-01 274403 STONE 3.10
28/01/2021 UCY BP-01 274404 SIKA 204 13.80
28/01/2021 UCY BP-01 274405 CEMENT 1.38
28/01/2021 UCY BP-01 274406 SAND 2.51
28/01/2021 UCY BP-01 274407 STONE 3.10
28/01/2021 UCY BP-01 274408 SIKA 204 13.80
28/01/2021 UCY BP-01 274409 CEMENT 1.26
28/01/2021 UCY BP-01 274410 SAND 2.52
28/01/2021 UCY BP-01 274411 STONE 3.10
28/01/2021 UCY BP-01 274412 SIKA 204 12.60
28/01/2021 UCY BP-01 274413 CEMENT 2.10
28/01/2021 UCY BP-01 274414 SAND 4.20
28/01/2021 UCY BP-01 274415 STONE 5.17
28/01/2021 UCY BP-01 274416 SIKA 204 21.00
28/01/2021 UCY BP-02 274417 CEMENT 15.41
28/01/2021 UCY BP-02 274418 SAND 28.42
28/01/2021 UCY BP-02 274419 STONE 34.32
28/01/2021 UCY BP-02 274420 O-BASF 8320 151.80
28/01/2021 UCY BP-02 274421 CEMENT 0.42
28/01/2021 UCY BP-02 274422 SAND 0.84
28/01/2021 UCY BP-02 274423 STONE 1.04
28/01/2021 UCY BP-02 274424 O-BASF 8320 4.20
28/01/2021 UCY BP-01 - CEMENT 6.77
28/01/2021 UCY BP-01 - SAND 13.46
28/01/2021 UCY BP-01 - STONE 17.16
28/01/2021 UCY BP-01 - SIKA 204 74.42
28/01/2021 UCY BP-02 - CEMENT 27.26
28/01/2021 UCY BP-02 - SAND 55.26
28/01/2021 UCY BP-02 - STONE 69.56
28/01/2021 UCY BP-02 - O-BASF 8320 299.92
28/01/2021 UCY BP-01 - CEMENT 41.96
28/01/2021 UCY BP-01 - SAND 75.74
28/01/2021 UCY BP-01 - STONE 96.72
28/01/2021 UCY BP-01 - SIKA 3006 ES 247.67

Record BY
Operator
21
SUBJOB RECORDER
S4000 C3S3-SUB CEMENT 120.32 tons
S4000 C3S3-SUB SAND 235.72 tons
S4000 C3S3-SUB STONE 292.14 tons
S4000 C3S3-SUB SIKA 204 403.77 kg
S4000 C3S3-SUB SIKA 3006 ES 247.67 kg
S4000 C3S4 -SUB O-BASF 8320 455.92 kg
S4000 C3S4 -SUB SIKA LATEX POWER 248.50 kg
S4000 C3S4 -SUB
S4000 C3S4 -SUB UCY BP-01 UCY BP-02
S4000 C3S2-SUB CEMENT 77.23 43.09
S4000 C3S2-SUB SAND 151.2 84.52
S4000 C3S2-SUB STONE 187.22 104.92
S4000 C3S2-SUB SIKA 204 403.77 0
26101 C3ML-SUB SIKA 3006 ES 247.67 0
26101 C3ML-SUB O-BASF 8320 0 455.92
26101 C3ML-SUB SIKA LATEX POWER 248.5 0
26101 C3ML-SUB
S4000 C3S2-SUB CP-0602
S4000 C3S2-SUB
S4000 C3S2-SUB UCY BP-01 UCY BP-02
S4000 C3S2-SUB CEMENT 41.96 0
28003 CEML-SUB SAND 75.74 0
28003 CEML-SUB STONE 96.72 0
28003 CEML-SUB SIKA 204 0 0
28003 CEML-SUB SIKA 3006 ES 247.67 0
S4000 C3S4-SUB O-BASF 8320 0 0
S4000 C3S4-SUB
S4000 C3S4-SUB
S4000 C3S4-SUB CP-07
33003 C3S4-ARC
33003 C3S4-ARC UCY BP-01 UCY BP-02
33003 C3S4-ARC CEMENT 6.77 27.26
33003 C3S4-ARC SAND 13.46 55.26
CP-07 STONE 17.16 69.56
CP-07 SIKA 204 74.42 0
CP-07 SIKA 3006 ES 0 0
CP-07 O-BASF 8320 0 299.92
CP-07
CP-07
CP-07 CP-03&04
CP-07
CP-0602 UCY BP-01 UCY BP-02
CP-0602 CEMENT 28.5 15.83
CP-0602 SAND 62 29.26
CP-0602 STONE 73.34 35.36
SIKA 204 329.35 0
SIKA 3006 ES 0 0
O-BASF 8320 0 156
SIKA LATEX POWER 248.5 0

Check by
Plant Engineer

Check by
Engineer THAI
total
120.32 tons
235.72 tons
292.14 tons
403.77 kg
247.67 kg
455.92 kg
248.5 kg

SIKA 3006 ES

total
41.96 tons O-BASF 8320
75.74 tons
96.72 tons
0 kg
247.67 kg
0 kg

total
34.03 tons
68.72 tons
86.72 tons
74.42 kg
0 kg
299.92 kg
total
44.33 tons
91.26 tons
108.7 tons
329.35 kg
0 kg
156 kg
248.5 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 29/01/2021
Summary RQ
DATE Plant RQ NO Material QTY
29/01/2021 UCY BP-01 273247 CEMENT 10.21
29/01/2021 UCY BP-01 273248 SAND 25.54
29/01/2021 UCY BP-01 273249 STONE 30.95
29/01/2021 UCY BP-01 273250 O-BASF 8320 139.65
29/01/2021 UCY BP-01 273251 SIKA LATEX POWER 199.5
29/01/2021 UCY BP-01 273252 CEMENT 73.71
29/01/2021 UCY BP-01 273253 SAND 148.12
29/01/2021 UCY BP-01 273254 STONE 181.64
29/01/2021 UCY BP-01 273255 O-BASF 8320 737.10
29/01/2021 UCY BP-02 273256 CEMENT 12.00
29/01/2021 UCY BP-02 273257 SAND 24.81
29/01/2021 UCY BP-02 273258 STONE 28.46
29/01/2021 UCY BP-02 273259 O-BASF 8320 115.50
29/01/2021 UCY BP-02 273260 CEMENT 7.05
29/01/2021 UCY BP-02 273261 SAND 15.10
29/01/2021 UCY BP-02 273262 STONE 18.08
29/01/2021 UCY BP-02 273263 O-BASF 8320 63.47
29/01/2021 UCY BP-02 273264 CEMENT 0.57
29/01/2021 UCY BP-02 273265 SAND 1.04
29/01/2021 UCY BP-02 273266 STONE 1.29
29/01/2021 UCY BP-02 273267 O-BASF 8320 5.75
29/01/2021 UCY BP-02 273268 CEMENT 1.05
29/01/2021 UCY BP-02 273269 SAND 2.11
29/01/2021 UCY BP-02 273270 STONE 2.59
29/01/2021 UCY BP-02 273271 O-BASF 8320 10.50
29/01/2021 UCY BP-02 273272 CEMENT 70.98
29/01/2021 UCY BP-02 273273 SAND 142.64
29/01/2021 UCY BP-02 273274 STONE 174.91
29/01/2021 UCY BP-02 273275 O-BASF 8320 709.80
29/01/2021 UCY BP-01 - CEMENT 2.72
29/01/2021 UCY BP-01 - SAND 5.62
29/01/2021 UCY BP-01 - STONE 7.10
29/01/2021 UCY BP-01 - SIKA 3006 ES 12.24
Record BY
Operator
21
SUBJOB RECORDER
33003 C3S1 -ARC CEMENT 178.29 tons
33003 C3S1 -ARC SAND 364.98 tons
33003 C3S1 -ARC STONE 445.02 tons
33003 C3S1 -ARC SIKA 204 0 kg
33003 C3S1 -ARC SIKA 3006 ES 12.24 kg
S4000 C4S6-SUB O-BASF 8320 1781.77 kg
S4000 C4S6-SUB SIKA LATEX POWER 199.50 kg
S4000 C4S6-SUB
S4000 C4S6-SUB UCY BP-01 UCY BP-02
S4000 C3S3-SUB CEMENT 86.64 91.65
S4000 C3S3-SUB SAND 179.28 185.7
S4000 C3S3-SUB STONE 219.69 225.33
S4000 C3S3-SUB SIKA 204 0 0
20103 TRAFFICM SIKA 3006 ES 12.24 0
20103 TRAFFICM O-BASF 8320 876.75 905.02
20103 TRAFFICM SIKA LATEX POWER 199.5 0
20103 TRAFFICM
28006 C3ML-SUB CP-0602
28006 C3ML-SUB
28006 C3ML-SUB UCY BP-01 UCY BP-02
28006 C3ML-SUB CEMENT 2.72 0
28003 C3ML-SUB SAND 5.62 0
28003 C3ML-SUB STONE 7.1 0
28003 C3ML-SUB SIKA 204 0 0
28003 C3ML-SUB SIKA 3006 ES 12.24 0
S4000 C4S6-SUB O-BASF 8320 0 0
S4000 C4S6-SUB
S4000 C4S6-SUB
S4000 C4S6-SUB CP-07
CP-0602
CP-0602 UCY BP-01 UCY BP-02
CP-0602 CEMENT 0 0
CP-0602 SAND 0 0
STONE 0 0
SIKA 204 0 0
SIKA 3006 ES 0 0
O-BASF 8320 0 0

CP-03&04
UCY BP-01 UCY BP-02
CEMENT 83.92 91.65
SAND 173.66 185.7
STONE 212.59 225.33
SIKA 204 0 0
SIKA 3006 ES 0 0
O-BASF 8320 876.75 905.02
SIKA LATEX POWER 199.5 0

Check by
Plant Engineer

Check by
Engineer THAI
total
178.29 tons
364.98 tons
445.02 tons
0 kg
12.24 kg
1781.77 kg
199.5 kg

SIKA 3006 ES

total
2.72 tons O-BASF 8320
5.62 tons
7.1 tons
0 kg
12.24 kg
0 kg

total
0 tons
0 tons
0 tons
0 kg
0 kg
0 kg
total
175.57 tons
359.36 tons
437.92 tons
0 kg
0 kg
1781.77 kg
199.5 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 30/01/2021
Summary RQ
DATE Plant RQ NO Material QTY
30/01/2021 UCY BP-01 274425 CEMENT 7.91
30/01/2021 UCY BP-01 274426 SAND 14.38
30/01/2021 UCY BP-01 274427 STONE 17.8
30/01/2021 UCY BP-01 274428 SIKA 3006 ES 47.47
30/01/2021 UCY BP-01 274429 CEMENT 2.73
30/01/2021 UCY BP-01 274430 SAND 5.51
30/01/2021 UCY BP-01 274431 STONE 6.75
30/01/2021 UCY BP-01 274432 O-BASF 8320 27.30
30/01/2021 UCY BP-02 274433 CEMENT 0.23
30/01/2021 UCY BP-02 274434 SAND 0.80
30/01/2021 UCY BP-02 274435 CEMENT 8.63
30/01/2021 UCY BP-02 274436 SAND 17.74
30/01/2021 UCY BP-02 274437 STONE 20.78
30/01/2021 UCY BP-02 274438 O-BASF 8320 84.00
30/01/2021 UCY BP-02 274439 CEMENT 8.21
30/01/2021 UCY BP-02 274440 SAND 16.89
30/01/2021 UCY BP-02 274441 STONE 19.74
30/01/2021 UCY BP-02 274442 O-BASF 8320 79.80
30/01/2021 UCY BP-02 274443 CEMENT 0.25
30/01/2021 UCY BP-02 274444 SAND 0.79
30/01/2021 UCY BP-02 274445 CEMENT 0.47
30/01/2021 UCY BP-02 274446 SAND 1.18
30/01/2021 UCY BP-02 274447 STONE 1.37
30/01/2021 UCY BP-02 274448 O-BASF 8320 4.68
30/01/2021 UCY BP-02 274449 CEMENT 3.92
30/01/2021 UCY BP-02 274450 SAND 6.32
30/01/2021 UCY BP-02 274451 STONE 8.26
30/01/2021 UCY BP-02 274452 SIKA 204 47.04
30/01/2021 UCY BP-02 274453 CEMENT 8.19
30/01/2021 UCY BP-02 274454 SAND 16.52
30/01/2021 UCY BP-02 274455 STONE 20.26
30/01/2021 UCY BP-02 274456 O-BASF 8320 81.90
30/01/2021 UCY BP-02 274457 CEMENT 1.47
30/01/2021 UCY BP-02 274458 SAND 2.96
30/01/2021 UCY BP-02 274459 STONE 3.64
30/01/2021 UCY BP-02 274460 O-BASF 8320 14.70
30/01/2021 UCY BP-02 274461 CEMENT 4.62
30/01/2021 UCY BP-02 274462 SAND 9.32
30/01/2021 UCY BP-02 274463 STONE 11.43
30/01/2021 UCY BP-02 274464 O-BASF 8320 46.20
30/01/2021 UCY BP-02 274465 CEMENT 1.38
30/01/2021 UCY BP-02 274466 SAND 2.53
30/01/2021 UCY BP-02 274467 STONE 3.11
30/01/2021 UCY BP-02 274468 O-BASF 8320 13.80
30/01/2021 UCY BP-02 274469 CEMENT 1.84
30/01/2021 UCY BP-02 274470 SAND 3.37
30/01/2021 UCY BP-02 274471 STONE 4.15
30/01/2021 UCY BP-02 274472 O-BASF 8320 18.40
30/01/2021 UCY BP-02 274473 CEMENT 0.74
30/01/2021 UCY BP-02 274474 SAND 1.35
30/01/2021 UCY BP-02 274475 STONE 1.66
30/01/2021 UCY BP-02 274476 O-BASF 8320 7.36
30/01/2021 UCY BP-02 274477 CEMENT 8.97
30/01/2021 UCY BP-02 274478 SAND 16.44
30/01/2021 UCY BP-02 274479 STONE 20.25
30/01/2021 UCY BP-02 274480 O-BASF 8320 89.70
30/01/2021 UCY BP-02 - CEMENT 23.78
30/01/2021 UCY BP-02 - SAND 47.79
30/01/2021 UCY BP-02 - STONE 60.44
30/01/2021 UCY BP-02 - O-BASF 8320 261.58
30/01/2021 UCY BP-01 - CEMENT 40.99
30/01/2021 UCY BP-01 - SAND 73.77
30/01/2021 UCY BP-01 - STONE 94.63
30/01/2021 UCY BP-01 - SIKA 3006 ES 241.87

Record BY
Operator
21
SUBJOB RECORDER
20103 TRAFFICAM CEMENT 124.33 tons
20103 TRAFFICAM SAND 237.66 tons
20103 TRAFFICAM STONE 294.27 tons
20103 TRAFFICAM SIKA 204 47.04 kg
28003 C3ML-SUB SIKA 3006 ES 289.34 kg
28003 C3ML-SUB O-BASF 8320 729.42 kg
28003 C3ML-SUB SIKA LATEX POWER 0.00 kg
28003 C3ML-SUB
28003 C3ML-SUB UCY BP-01 UCY BP-02
28003 C3ML-SUB CEMENT 51.63 72.7
S4000 C3S3-SUB SAND 93.66 144
S4000 C3S3-SUB STONE 119.18 175.09
S4000 C3S3-SUB SIKA 204 0 47.04
S4000 C3S3-SUB SIKA 3006 ES 289.34 0
S4000 C3S2-SUB O-BASF 8320 27.3 702.12
S4000 C3S2-SUB SIKA LATEX POWER 0 0
S4000 C3S2-SUB
S4000 C3S2-SUB CP-0602
S4000 C3S4-SUB
S4000 C3S4-SUB UCY BP-01 UCY BP-02
20106 SUB CEMENT 40.99 0
20106 SUB SAND 73.77 0
20106 SUB STONE 94.63 0
20106 SUB SIKA 204 0 0
24000 C4ML-SUB SIKA 3006 ES 241.87 0
24000 C4ML-SUB O-BASF 8320 0 0
24000 C4ML-SUB
24000 C4ML-SUB
S4000 C4S6-SUB CP-07
S4000 C4S6-SUB
S4000 C4S6-SUB UCY BP-01 UCY BP-02
S4000 C4S6-SUB CEMENT 0 23.78
33003 C3S2-ARC SAND 0 47.79
33003 C3S2-ARC STONE 0 60.44
33003 C3S2-ARC SIKA 204 0 0
33003 C3S2-ARC SIKA 3006 ES 0 0
28003 C3ML-SUB O-BASF 8320 0 261.58
28003 C3ML-SUB
28003 C3ML-SUB
28003 C3ML-SUB CP-03&04
28006 C3ML-SUB
28006 C3ML-SUB UCY BP-01 UCY BP-02
28006 C3ML-SUB CEMENT 10.64 48.92
28006 C3ML-SUB SAND 19.89 96.21
26101 C3ML-SUB STONE 24.55 114.65
26101 C3ML-SUB SIKA 204 0 47.04
26101 C3ML-SUB SIKA 3006 ES 47.47 0
26101 C3ML-SUB O-BASF 8320 27.3 440.54
S4000 C3S1-SUB SIKA LATEX POWER 0 0
S4000 C3S1-SUB
S4000 C3S1-SUB
S4000 C3S1-SUB
S4000 C3S4-SUB
S4000 C3S4-SUB
S4000 C3S4-SUB
S4000 C3S4-SUB
CP-07
CP-07
CP-07
CP-07
CP-0602
CP-0602
CP-0602
CP-0602

Check by
Plant Engineer

Check by
Engineer THAI
total
124.33 tons
237.66 tons
294.27 tons
47.04 kg
289.34 kg
729.42 kg
0 kg

SIKA 3006 ES

total
40.99 tons O-BASF 8320
73.77 tons
94.63 tons
0 kg
241.87 kg
0 kg

total
23.78 tons
47.79 tons
60.44 tons
0 kg
0 kg
261.58 kg
total
59.56 tons
116.1 tons
139.2 tons
47.04 kg
47.47 kg
467.84 kg
0 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 31/01/2021
Summary RQ
DATE Plant RQ NO Material QTY
31/01/2021 UCY BP-01 273449 CEMENT 7.91
31/01/2021 UCY BP-01 273450 SAND 14.38
31/01/2021 UCY BP-01 273451 STONE 17.77
31/01/2021 UCY BP-01 273452 SIKA 3006 ES 47.47
31/01/2021 UCY BP-01 273453 CEMENT 5.04
31/01/2021 UCY BP-01 273454 SAND 10.08
31/01/2021 UCY BP-01 273455 STONE 12.40
31/01/2021 UCY BP-01 273456 O-BASF 8320 50.40
31/01/2021 UCY BP-01 273457 CEMENT 1.26
31/01/2021 UCY BP-01 273458 SAND 2.52
31/01/2021 UCY BP-01 273459 STONE 3.10
31/01/2021 UCY BP-01 273460 O-BASF 8320 12.60
31/01/2021 UCY BP-01 273461 CEMENT 1.38
31/01/2021 UCY BP-01 273462 SAND 2.51
31/01/2021 UCY BP-01 273463 STONE 3.10
31/01/2021 UCY BP-01 273464 O-BASF 8320 13.80
31/01/2021 UCY BP-02 273465 CEMENT 2.75
31/01/2021 UCY BP-02 273466 SAND 5.86
31/01/2021 UCY BP-02 273467 STONE 6.22
31/01/2021 UCY BP-02 273468 O-BASF 8320 25.20
31/01/2021 UCY BP-02 273469 CEMENT 21.41
31/01/2021 UCY BP-02 273470 SAND 53.31
31/01/2021 UCY BP-02 273471 STONE 65.82
31/01/2021 UCY BP-02 273472 SIKA 204 296.45
31/01/2021 UCY BP-02 273473 CEMENT 8.48
31/01/2021 UCY BP-02 273474 SAND 16.34
31/01/2021 UCY BP-02 273475 STONE 19.18
31/01/2021 UCY BP-02 273476 O-BASF 8320 82.50
31/01/2021 UCY BP-02 273477 CEMENT 1.51
31/01/2021 UCY BP-02 273478 SAND 6.22
31/01/2021 UCY BP-02 273479 STONE 6.88
31/01/2021 UCY BP-02 273480 O-BASF 8320 14.95
31/01/2021 UCY BP-02 273481 CEMENT 1.68
31/01/2021 UCY BP-02 273482 SAND 3.37
31/01/2021 UCY BP-02 273483 STONE 4.15
31/01/2021 UCY BP-02 273484 O-BASF 8320 16.80
31/01/2021 UCY BP-01 - CEMENT 8.82
31/01/2021 UCY BP-01 - SAND 17.85
31/01/2021 UCY BP-01 - STONE 22.42
31/01/2021 UCY BP-01 - O-BASF 8320 96.97
31/01/2021 UCY BP-02 - CEMENT 25.83
31/01/2021 UCY BP-02 - SAND 52.04
31/01/2021 UCY BP-02 - STONE 65.91
31/01/2021 UCY BP-02 - O-BASF 8320 284.13
31/01/2021 UCY BP-01 - CEMENT 55.66
31/01/2021 UCY BP-01 - SAND 99.34
31/01/2021 UCY BP-01 - STONE 127.41
31/01/2021 UCY BP-01 - SIKA 3006 ES 333.96

Record BY
Operator
21
SUBJOB RECORDER
20103-TRAFFICM CEMENT 141.73 tons
20103-TRAFFICM SAND 283.82 tons
20103-TRAFFICM STONE 354.36 tons
20103-TRAFFICM SIKA 204 296.45 kg
28003C3ML-SUB SIKA 3006 ES 381.43 kg
28003C3ML-SUB O-BASF 8320 597.35 kg
28003C3ML-SUB SIKA LATEX POWER 0.00 kg
28003C3ML-SUB
S4000C3S4-SUB UCY BP-01 UCY BP-02
S4000C3S4-SUB CEMENT 80.07 61.66
S4000C3S4-SUB SAND 146.68 137.14
S4000C3S4-SUB STONE 186.20 168.16
S4000C3S2-SUB SIKA 204 0 296.45
S4000C3S2-SUB SIKA 3006 ES 381.43 0
S4000C3S2-SUB O-BASF 8320 173.77 423.58
S4000C3S2-SUB SIKA LATEX POWER 0 0
28003C3ML-SUB
28003C3ML-SUB CP-0602
28003C3ML-SUB
28003C3ML-SUB UCY BP-01 UCY BP-02
31002C3S1-SUB CEMENT 55.66 0
31002C3S1-SUB SAND 99.34 0
31002C3S1-SUB STONE 127.41 0
31002C3S1-SUB SIKA 204 0 0
S4000C3S4-SUB SIKA 3006 ES 333.96 0
S4000C3S4-SUB O-BASF 8320 0 0
S4000C3S4-SUB
S4000C3S4-SUB
S4000C4S5-SUB CP-07
S4000C4S5-SUB
S4000C4S5-SUB UCY BP-01 UCY BP-02
S4000C4S5-SUB CEMENT 8.82 25.83
33003C3S3-ARC SAND 17.85 52.04
33003C3S3-ARC STONE 22.42 65.91
33003C3S3-ARC SIKA 204 0 0
33003C3S3-ARC SIKA 3006 ES 0 0
CP-07 O-BASF 8320 96.97 284.13
CP-07
CP-07
CP-07 CP-03&04
CP-07
CP-07 UCY BP-01 UCY BP-02
CP-07 CEMENT 15.59 35.83
CP-07 SAND 29.49 85.1
CP-0602 STONE 36.37 102.25
CP-0602 SIKA 204 0 296.45
CP-0602 SIKA 3006 ES 47.47 0
CP-0602 O-BASF 8320 76.8 139.45
SIKA LATEX POWER 0 0

Check by
Plant Engineer

Check by
Engineer THAI
total
141.73 tons
283.82 tons
354.36 tons
296.45 kg
381.43 kg
597.35 kg
0 kg

SIKA 3006 ES

total
55.66 tons O-BASF 8320
99.34 tons
127.41 tons
0 kg
333.96 kg
0 kg

total
34.65 tons
69.89 tons
88.33 tons
0 kg
0 kg
381.1 kg
total
51.42 tons
114.59 tons
138.62 tons
296.45 kg
47.47 kg
216.25 kg
0 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 01/02/2021
Summary RQ
DATE Plant RQ NO Material QTY
1/02/2021 UCY BP-01 273277 CEMENT 7.91
1/02/2021 UCY BP-01 273278 SAND 14.43
1/02/2021 UCY BP-01 273279 STONE 17.77
1/02/2021 UCY BP-01 273280 SIKA 3006 ES 47.47
1/02/2021 UCY BP-01 273281 CEMENT 0.25
1/02/2021 UCY BP-01 273282 SAND 0.78
1/02/2021 UCY BP-01 273283 O-BASF 8320 1.50
1/02/2021 UCY BP-02 273284 CEMENT 3.80
1/02/2021 UCY BP-02 273285 SAND 7.99
1/02/2021 UCY BP-02 273286 STONE 8.79
1/02/2021 UCY BP-02 273287 O-BASF 8320 35.70
1/02/2021 UCY BP-02 273288 CEMENT 18.61
1/02/2021 UCY BP-02 273289 SAND 46.27
1/02/2021 UCY BP-02 273290 STONE 57.12
1/02/2021 UCY BP-02 273291 O-BASF 8320 257.25
1/02/2021 UCY BP-02 273292 CEMENT 13.01
1/02/2021 UCY BP-02 273293 SAND 32.41
1/02/2021 UCY BP-02 273294 STONE 39.71
1/02/2021 UCY BP-02 273295 O-BASF 8320 178.85
1/02/2021 UCY BP-02 273296 CEMENT 32.57
1/02/2021 UCY BP-02 273297 SAND 65.94
1/02/2021 UCY BP-02 273298 STONE 79.62
1/02/2021 UCY BP-02 273299 O-BASF 8320 323.40
1/02/2021 UCY BP-02 273300 CEMENT 2.75
1/02/2021 UCY BP-02 273301 SAND 5.88
1/02/2021 UCY BP-02 273302 STONE 6.20
1/02/2021 UCY BP-02 273303 O-BASF 8320 25.20
1/02/2021 UCY BP-02 273304 CEMENT 0.46
1/02/2021 UCY BP-02 273305 SAND 0.84
1/02/2021 UCY BP-02 273306 STONE 1.03
1/02/2021 UCY BP-02 273307 O-BASF 8320 4.60
1/02/2021 UCY BP-02 273308 CEMENT 0.92
1/02/2021 UCY BP-02 273309 SAND 3.83
1/02/2021 UCY BP-02 273310 STONE 4.23
1/02/2021 UCY BP-02 273311 O-BASF 8320 9.20
1/02/2021 UCY BP-02 273312 CEMENT 2.52
1/02/2021 UCY BP-02 273313 SAND 5.08
1/02/2021 UCY BP-02 273314 STONE 6.20
1/02/2021 UCY BP-02 273315 O-BASF 8320 25.20
1/02/2021 UCY BP-01 - CEMENT 2.26
1/02/2021 UCY BP-01 - SAND 4.54
1/02/2021 UCY BP-01 - STONE 5.70
1/02/2021 UCY BP-01 - O-BASF 8320 24.81
1/02/2021 UCY BP-02 - CEMENT 27.06
1/02/2021 UCY BP-02 - SAND 54.71
1/02/2021 UCY BP-02 - STONE 68.77
1/02/2021 UCY BP-02 - O-BASF 8320 297.66
1/02/2021 UCY BP-01 - CEMENT 52.76
1/02/2021 UCY BP-01 - SAND 94.28
1/02/2021 UCY BP-01 - STONE 120.55
1/02/2021 UCY BP-01 - SIKA 3006 ES 316.57
1/02/2021 UCY BP-02 - CEMENT 2.72
1/02/2021 UCY BP-02 - SAND 5.68
1/02/2021 UCY BP-02 - STONE 7.07
1/02/2021 UCY BP-02 - SIKA 3006 ES 12.24

Record BY
Operator
21
SUBJOB RECORDER
20103 TRAFFICM CEMENT 167.60 tons
20103 TRAFFICM SAND 342.66 tons
20103 TRAFFICM STONE 422.76 tons
20103 TRAFFICM SIKA 204 0.00 kg
S4000 C3S4 SIKA 3006 ES 376.28 kg
S4000 C3S4 O-BASF 8320 1183.37 kg
S4000 C3S4 SIKA LATEX POWER 0.00 kg
S4000 C3S4
S4000 C3S4 UCY BP-01 UCY BP-02
S4000 C3S4 CEMENT 63.18 104.42
S4000 C3S4 SAND 114.03 228.63
31002 C3S2 STONE 144.02 278.74
31002 C3S2 SIKA 204 0.00 0.00
31002 C3S2 SIKA 3006 ES 364.04 12.24
31002 C3S2 O-BASF 8320 26.31 1157.06
31002 C3S1 SIKA LATEX POWER 0.00 0.00
31003 C3S1
31004 C3S1 CP-0602
31005 C3S1
S6000 C3S1 UCY BP-01 UCY BP-02
S6000 C3S1 CEMENT 52.76 2.72
S6000 C3S1 SAND 94.28 5.68
S6000 C3S1 STONE 120.55 7.07
28001 SP-A SIKA 204 0.00 0.00
28001 SP-A SIKA 3006 ES 316.57 12.24
28001 SP-A O-BASF 8320 0.00 0.00
28001 SP-A
28006 C3ML
28006 C3ML CP-07
28006 C3ML
28006 C3ML UCY BP-01 UCY BP-02
S4000 C3S5 CEMENT 2.26 27.06
S4000 C3S5 SAND 4.54 54.71
S4000 C3S5 STONE 5.70 68.77
S4000 C3S5 SIKA 204 0.00 0.00
28003 C3ML SIKA 3006 ES 0.00 0.00
28003 C3ML O-BASF 8320 24.81 297.66
28003 C3ML
28003 C3ML
CP-07 CP-03&04
CP-07
CP-07 UCY BP-01 UCY BP-02
CP-07 CEMENT 8.16 74.64
CP-07 SAND 15.21 168.24
CP-07 STONE 17.77 202.90
CP-07 SIKA 204 0.00 0.00
CP-07 SIKA 3006 ES 47.47 0.00
CP-0602 O-BASF 8320 1.50 859.40
CP-0602 SIKA LATEX POWER 0.00 0.00
CP-0602
CP-0602
CP-0602
CP-0602
CP-0602
CP-0602

Check by
Plant Engineer

Check by
Engineer THAI
total
167.60 tons
342.66 tons
422.76 tons
0.00 kg
376.28 kg
1183.37 kg
0.00 kg

SIKA 3006 ES

total
55.48 tons O-BASF 8320
99.96 tons
127.62 tons
0.00 kg
328.81 kg
0.00 kg

total
29.32 tons
59.25 tons
74.47 tons
0.00 kg
0.00 kg
322.47 kg
total
82.80 tons
183.45 tons
220.67 tons
0.00 kg
47.47 kg
860.90 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 02/02/2021
Summary RQ
DATE Plant RQ NO Material QTY
2/2/2021 UCY BP-01 246216 CEMENT 7.36
2/2/2021 UCY BP-01 246217 SAND 13.80
2/2/2021 UCY BP-01 246218 STONE 16.03
2/2/2021 UCY BP-01 246219 O-BASF 8320 71.30
2/2/2021 UCY BP-01 246220 CEMENT 3.38
2/2/2021 UCY BP-01 246221 SAND 7.13
2/2/2021 UCY BP-01 246222 STONE 7.76
2/2/2021 UCY BP-01 246223 O-BASF 8320 31.50
2/2/2021 UCY BP-01 246224 CEMENT 1.20
2/2/2021 UCY BP-01 246225 SAND 2.18
2/2/2021 UCY BP-01 246226 STONE 2.68
2/2/2021 UCY BP-01 246227 SIKA 3006 ES 7.17
2/2/2021 UCY BP-01 246228 CEMENT 7.91
2/2/2021 UCY BP-01 246229 SAND 14.43
2/2/2021 UCY BP-01 246230 STONE 17.79
2/2/2021 UCY BP-01 246231 SIKA 3006 ES 47.48
2/2/2021 UCY BP-01 246232 CEMENT 2.74
2/2/2021 UCY BP-01 246233 SAND 5.71
2/2/2021 UCY BP-01 246234 STONE 6.93
2/2/2021 UCY BP-01 246235 O-BASF 8320 27.42
2/2/2021 UCY BP-01 246236 CEMENT 0.63
2/2/2021 UCY BP-01 246237 SAND 1.27
2/2/2021 UCY BP-01 246238 STONE 1.55
2/2/2021 UCY BP-01 246239 O-BASF 8320 6.30
2/2/2021 UCY BP-02 246240 CEMENT 7.41
2/2/2021 UCY BP-02 246241 SAND 18.61
2/2/2021 UCY BP-02 246242 STONE 22.28
2/2/2021 UCY BP-02 246243 O-BASF 8320 100.45
2/2/2021 UCY BP-02 246244 CEMENT 5.69
2/2/2021 UCY BP-02 246245 SAND 11.76
2/2/2021 UCY BP-02 246246 STONE 13.51
2/2/2021 UCY BP-02 246247 O-BASF 8320 54.60
2/2/2021 UCY BP-01 - CEMENT 30.55
2/2/2021 UCY BP-01 - SAND 61.31
2/2/2021 UCY BP-01 - STONE 77.55
2/2/2021 UCY BP-01 - O-BASF 8320 336.00
2/2/2021 UCY BP-02 - CEMENT 4.92
2/2/2021 UCY BP-02 - SAND 9.88
2/2/2021 UCY BP-02 - STONE 12.49
2/2/2021 UCY BP-02 - O-BASF 8320 54.12
2/2/2021 UCY BP-01 - CEMENT 47.06
2/2/2021 UCY BP-01 - SAND 84.78
2/2/2021 UCY BP-01 - STONE 108.78
2/2/2021 UCY BP-01 - SIKA 3006 ES 278.30

Record BY
Operator
21
SUBJOB RECORDER
S4000 C3S4 CEMENT 118.85 tons
S4000 C3S4 SAND 230.86 tons
S4000 C3S4 STONE 287.35 tons
S4000 C3S4 SIKA 204 0.00 kg
28003 C3ML SIKA 3006 ES 332.95 kg
28003 C3ML O-BASF 8320 681.69 kg
28003 C3ML SIKA LATEX POWER 0.00 kg
28003 C3ML
28001 SP-A-SUP UCY BP-01 UCY BP-02
28001 SP-A-SUP CEMENT 100.83 18.02
28001 SP-A-SUP SAND 190.61 40.25
28001 SP-A-SUP STONE 239.07 48.28
20103 TRAFFICM SIKA 204 0.00 0.00
20103 TRAFFICM SIKA 3006 ES 332.95 0.00
20103 TRAFFICM O-BASF 8320 472.52 209.17
20103 TRAFFICM SIKA LATEX POWER 0.00 0.00
24000 C3ML
24000 C3ML CP-0602
24000 C3ML
24000 C3ML UCY BP-01 UCY BP-02
33003 C3S4 ARC CEMENT 47.06 0.00
33003 C3S4 ARC SAND 84.78 0.00
33003 C3S4 ARC STONE 108.78 0.00
33003 C3S4 ARC SIKA 204 0.00 0.00
31002 C3S3 ARC SIKA 3006 ES 278.30 0.00
31002 C3S3 ARC O-BASF 8320 0.00 0.00
31002 C3S3 ARC
31002 C3S3 ARC
28003 C3ML CP-07
28003 C3ML
28003 C3ML UCY BP-01 UCY BP-02
28003 C3ML CEMENT 30.55 4.92
CP-07 SAND 61.31 9.88
CP-07 STONE 77.55 12.49
CP-07 SIKA 204 0.00 0.00
CP-07 SIKA 3006 ES 0.00 0.00
CP-07 O-BASF 8320 336.00 54.12
CP-07
CP-07
CP-07 CP-03&04
CP-0602
CP-0602 UCY BP-01 UCY BP-02
CP-0602 CEMENT 23.22 13.10
CP-0602 SAND 44.52 30.37
STONE 52.74 35.79
SIKA 204 0.00 0.00
SIKA 3006 ES 54.65 0.00
O-BASF 8320 136.52 155.05
SIKA LATEX POWER 0.00 0.00

Check by
Plant Engineer

Check by
Engineer THAI
total
118.85 tons
230.86 tons
287.35 tons
0.00 kg
332.95 kg
681.69 kg
0.00 kg

SIKA 3006 ES

total
47.06 tons O-BASF 8320
84.78 tons
108.78 tons
0.00 kg
278.30 kg
0.00 kg

total
35.47 tons
71.19 tons
90.04 tons
0.00 kg
0.00 kg
390.12 kg
total
36.32 tons
74.89 tons
88.53 tons
0.00 kg
54.65 kg
291.57 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 03/02/2021
Summary RQ
DATE Plant RQ NO Material QTY
03/02/2021 UCY BP-01 246248 CEMENT 1.20
03/02/2021 UCY BP-01 246249 SAND 2.18
03/02/2021 UCY BP-01 246250 STONE 2.69
03/02/2021 UCY BP-01 246251 SIKA 3006 ES 7.18
03/02/2021 UCY BP-01 246253 CEMENT 7.82
03/02/2021 UCY BP-01 246254 SAND 14.24
03/02/2021 UCY BP-01 246255 STONE 17.56
03/02/2021 UCY BP-01 246256 SIKA 3006 ES 46.92
03/02/2021 UCY BP-01 246257 CEMENT 1.84
03/02/2021 UCY BP-01 246258 SAND 7.68
03/02/2021 UCY BP-01 246259 STONE 8.42
03/02/2021 UCY BP-01 246260 O-BASF 8320 18.40
03/02/2021 UCY BP-02 246261 CEMENT 5.26
03/02/2021 UCY BP-02 246262 SAND 10.93
03/02/2021 UCY BP-02 246263 STONE 12.42
03/02/2021 UCY BP-02 246264 O-BASF 8320 50.40
03/02/2021 UCY BP-02 246265 CEMENT 7.15
03/02/2021 UCY BP-02 246266 SAND 14.73
03/02/2021 UCY BP-02 246267 STONE 17.08
03/02/2021 UCY BP-02 246268 O-BASF 8320 69.30
03/02/2021 UCY BP-02 246269 CEMENT 6.48
03/02/2021 UCY BP-02 246270 SAND 12.49
03/02/2021 UCY BP-02 246271 STONE 13.46
03/02/2021 UCY BP-02 246272 O-BASF 8320 59.80
03/02/2021 UCY BP-02 246273 CEMENT 1.89
03/02/2021 UCY BP-02 246274 SAND 3.80
03/02/2021 UCY BP-02 246275 STONE 4.66
03/02/2021 UCY BP-02 246276 O-BASF 8320 18.90
03/02/2021 UCY BP-02 246277 CEMENT 1.47
03/02/2021 UCY BP-02 246278 SAND 2.95
03/02/2021 UCY BP-02 246279 STONE 3.62
03/02/2021 UCY BP-02 246280 O-BASF 8320 14.70
03/02/2021 UCY BP-01 CEMENT 2.26
03/02/2021 UCY BP-01 SAND 4.52
03/02/2021 UCY BP-01 STONE 5.72
03/02/2021 UCY BP-01 O-BASF 8320 24.81
03/02/2021 UCY BP-02 CEMENT 29.73
03/02/2021 UCY BP-02 SAND 59.67
03/02/2021 UCY BP-02 STONE 75.76
03/02/2021 UCY BP-02 O-BASF 8320 326.98
03/02/2021 UCY BP-02 CEMENT 3.45
03/02/2021 UCY BP-02 SAND 6.18
03/02/2021 UCY BP-02 STONE 7.89
03/02/2021 UCY BP-02 SIKA 3006 ES 20.70
03/02/2021 UCY BP-01 CEMENT 55.32
03/02/2021 UCY BP-01 SAND 100.31
03/02/2021 UCY BP-01 STONE 127.80
03/02/2021 UCY BP-01 SIKA 3006 ES 325.82

Record BY
Operator
21
SUBJOB RECORDER
28001 SP-A-SUP CEMENT 123.87 tons
28001 SP-A-SUP SAND 239.68 tons
28001 SP-A-SUP STONE 297.08 tons
28001 SP-A-SUP SIKA 204 0.00 kg
20103 TRAFFICAM SIKA 3006 ES 400.62 kg
20103 TRAFFICAM O-BASF 8320 583.29 kg
20103 TRAFFICAM SIKA LATEX POWER 0.00 kg
20103 TRAFFICAM
S4000 C4S5 SUB UCY BP-01 UCY BP-02
S4000 C4S5 SUB CEMENT 68.44 55.43
S4000 C4S5 SUB SAND 128.93 110.75
S4000 C4S5 SUB STONE 162.19 134.89
28003 C3ML SUB SIKA 204 0.00 0.00
28003 C3ML SUB SIKA 3006 ES 379.92 20.70
28003 C3ML SUB O-BASF 8320 43.21 540.08
28003 C3ML SUB SIKA LATEX POWER 0.00 0.00
S6000 C3S2 SUB
S6000 C3S2 SUB CP-0602
S6000 C3S2 SUB
S6000 C3S2 SUB UCY BP-01 UCY BP-02
S4000C3S4 SUB CEMENT 55.32 3.45
S4000C3S4 SUB SAND 100.31 6.18
S4000C3S4 SUB STONE 127.80 7.89
S4000C3S4 SUB SIKA 204 0.00 0.00
33003 C3S3 ARC SIKA 3006 ES 325.82 20.70
33003 C3S3 ARC O-BASF 8320 0.00 0.00
33003 C3S3 ARC
33003 C3S3 ARC
33003 C3S1 ARC CP-07
33003 C3S1 ARC
33003 C3S1 ARC UCY BP-01 UCY BP-02
33003 C3S1 ARC CEMENT 2.26 29.73
CP-07 SAND 4.52 59.67
CP-07 STONE 5.72 75.76
CP-07 SIKA 204 0.00 0.00
CP-07 SIKA 3006 ES 0.00 0.00
CP-07 O-BASF 8320 24.81 326.98
CP-07
CP-07
CP-07 CP-03&04
CP-0602
CP-0602 UCY BP-01 UCY BP-02
CP-0602 CEMENT 10.86 22.25
CP-0602 SAND 24.10 44.90
CP-0602 STONE 28.67 51.24
CP-0602 SIKA 204 0.00 0.00
CP-0602 SIKA 3006 ES 54.10 0.00
CP-0602 O-BASF 8320 18.40 213.10
SIKA LATEX POWER 0.00 0.00

Check by
Plant Engineer

Check by
Engineer THAI
total
123.87 tons
239.68 tons
297.08 tons
0.00 kg
400.62 kg
583.29 kg
0.00 kg

SIKA 3006 ES

total
58.77 tons O-BASF 8320
106.49 tons
135.69 tons
0.00 kg
346.52 kg
0.00 kg

total
31.99 tons
64.19 tons
81.48 tons
0.00 kg
0.00 kg
351.79 kg

total
33.11 tons
69.00 tons
79.91 tons
0.00 kg
54.10 kg
231.50 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 04/02/2021
Summary RQ
DATE Plant RQ NO Material QTY
04/02/2021 UCY BP-01 246281 CEMENT 16.16
04/02/2021 UCY BP-01 246282 SAND 40.34
04/02/2021 UCY BP-01 246283 STONE 49.46
04/02/2021 UCY BP-01 246284 SIKA 204 222.95
04/02/2021 UCY BP-01 246293 SIKA LATEX POWER 318.50
04/02/2021 UCY BP-01 246285 CEMENT 2.52
04/02/2021 UCY BP-01 246286 SAND 4.99
04/02/2021 UCY BP-01 246287 STONE 5.17
04/02/2021 UCY BP-01 246288 SIKA 204 23.00
04/02/2021 UCY BP-01 246289 CEMENT 0.36
04/02/2021 UCY BP-01 246290 SAND 0.91
04/02/2021 UCY BP-01 246291 STONE 1.05
04/02/2021 UCY BP-01 246292 SIKA 204 3.60
04/02/2021 UCY BP-01 246294 CEMENT 0.63
04/02/2021 UCY BP-01 246295 SAND 1.26
04/02/2021 UCY BP-01 246296 STONE 1.55
04/02/2021 UCY BP-01 246297 SIKA 204 6.30
04/02/2021 UCY BP-02 246298 CEMENT 7.59
04/02/2021 UCY BP-02 246299 SAND 14.30
04/02/2021 UCY BP-02 246300 STONE 16.63
04/02/2021 UCY BP-02 274480 O-BASF 8320 73.60
04/02/2021 UCY BP-02 274481 CEMENT 7.91
04/02/2021 UCY BP-02 274482 SAND 14.41
04/02/2021 UCY BP-02 274483 STONE 17.78
04/02/2021 UCY BP-02 274484 SIKA 3006 ES 47.47
04/02/2021 UCY BP-02 274485 CEMENT 1.21
04/02/2021 UCY BP-02 274486 SAND 2.18
04/02/2021 UCY BP-02 274487 STONE 2.69
04/02/2021 UCY BP-02 274488 SIKA 3006 ES 7.18
04/02/2021 UCY BP-02 274489 CEMENT 0.46
04/02/2021 UCY BP-02 274490 SAND 0.84
04/02/2021 UCY BP-02 274491 STONE 1.04
04/02/2021 UCY BP-02 274492 O-BASF 8320 4.60
04/02/2021 UCY BP-02 274494 CEMENT 1.61
04/02/2021 UCY BP-02 274495 SAND 2.95
04/02/2021 UCY BP-02 274496 STONE 3.64
04/02/2021 UCY BP-02 274497 O-BASF 8320 16.10
04/02/2021 UCY BP-02 274498 CEMENT 0.46
04/02/2021 UCY BP-02 274499 SAND 0.84
04/02/2021 UCY BP-02 274500 STONE 1.04
04/02/2021 UCY BP-02 274101 O-BASF 8320 4.60
04/02/2021 UCY BP-02 274102 CEMENT 3.11
04/02/2021 UCY BP-02 274103 SAND 12.92
04/02/2021 UCY BP-02 274104 STONE 14.28
04/02/2021 UCY BP-02 274105 O-BASF 8320 31.05
04/02/2021 UCY BP-02 274106 CEMENT 1.26
04/02/2021 UCY BP-02 274107 SAND 2.52
04/02/2021 UCY BP-02 274108 STONE 3.10
04/02/2021 UCY BP-02 274109 O-BASF 8320 12.60
04/02/2021 UCY BP-02 274110 CEMENT 0.63
04/02/2021 UCY BP-02 274111 SAND 1.26
04/02/2021 UCY BP-02 274112 STONE 1.55
04/02/2021 UCY BP-02 274113 O-BASF 8320 6.30
04/02/2021 UCY BP-02 274114 CEMENT 0.63
04/02/2021 UCY BP-02 274115 SAND 1.26
04/02/2021 UCY BP-02 274116 STONE 1.55
04/02/2021 UCY BP-02 274117 O-BASF 8320 6.30
04/02/2021 UCY BP-02 274118 CEMENT 1.68
04/02/2021 UCY BP-02 274119 SAND 3.36
04/02/2021 UCY BP-02 274120 STONE 4.14
04/02/2021 UCY BP-02 274121 O-BASF 8320 16.80
04/02/2021 UCY BP-02 274122 CEMENT 41.00
04/02/2021 UCY BP-02 274123 SAND 82.60
04/02/2021 UCY BP-02 274124 STONE 104.40
04/02/2021 UCY BP-02 274125 O-BASF 8320 451.00
04/02/2021 UCY BP-01 CEMENT 48.90
04/02/2021 UCY BP-01 SAND 87.17
04/02/2021 UCY BP-01 STONE 111.93
04/02/2021 UCY BP-01 SIKA 3006 ES 293.39
04/02/2021 UCY BP-02 CEMENT 2.72
04/02/2021 UCY BP-02 SAND 5.66
04/02/2021 UCY BP-02 STONE 7.09
04/02/2021 UCY BP-02 SIKA 3006 ES 12.24

Record BY
Operator
21
SUBJOB RECORDER
33003 C3S1-ARC CEMENT 138.84 tons
33003 C3S1-ARC SAND 279.77 tons
33003 C3S1-ARC STONE 348.09 tons
33003 C3S1-ARC SIKA 204 255.85 kg
33003 C3S1-ARC SIKA 3006 ES 360.28 kg
S4000 C3S4-SUB O-BASF 8320 622.95 kg
S4000 C3S4-SUB SIKA LATEX POWER 318.50 kg
S4000 C3S4-SUB
S4000 C3S4-SUB UCY BP-01 UCY BP-02
20106 SUB CEMENT 68.57 70.27
20106 SUB SAND 134.67 145.10
20106 SUB STONE 169.16 178.93
20106 SUB SIKA 204 255.85 0.00
33003 C3S2-ARC SIKA 3006 ES 293.39 66.89
33003 C3S2-ARC O-BASF 8320 0.00 622.95
33003 C3S2-ARC SIKA LATEX POWER 318.50 0.00
33003 C3S2-ARC
S4000 C3S4-SUB CP-0602
S4000 C3S4-SUB
S4000 C3S4-SUB UCY BP-01 UCY BP-02
S4000 C3S4-SUB CEMENT 48.90 2.72
20103 TRAFFICAM SAND 87.17 5.66
20103 TRAFFICAM STONE 111.93 7.09
20103 TRAFFICAM SIKA 204 0.00 0.00
20103 TRAFFICAM SIKA 3006 ES 293.39 12.24
28001 SP-A-SUP O-BASF 8320 0.00 0.00
28001 SP-A-SUP
28001 SP-A-SUP
28001 SP-A-SUP CP-07
28006 C3ML SUB
28006 C3ML SUB UCY BP-01 UCY BP-02
28006 C3ML SUB CEMENT 0.00 41.00
28006 C3ML SUB SAND 0.00 82.60
26101 STONE 0.00 104.40
26101 SIKA 204 0.00 0.00
26101 SIKA 3006 ES 0.00 0.00
26101 O-BASF 8320 0.00 451.00
26201 C3ML SUB
26201 C3ML SUB
26201 C3ML SUB CP-03&04
26201 C3ML SUB
S4000 C4S6-SUB UCY BP-01 UCY BP-02
S4000 C4S6-SUB CEMENT 19.67 26.55
S4000 C4S6-SUB SAND 47.50 56.84
S4000 C4S6-SUB STONE 57.23 67.44
28003 SP-A-SUP SIKA 204 255.85 0.00
28003 SP-A-SUP SIKA 3006 ES 0.00 54.65
28003 SP-A-SUP O-BASF 8320 0.00 171.95
28003 SP-A-SUP SIKA LATEX POWER 318.50 0.00
33003 C3S3-ARC
33003 C3S3-ARC
33003 C3S3-ARC
33003 C3S3-ARC
33003 C3S4-ARC
33003 C3S4-ARC
33003 C3S4-ARC
33003 C3S4-ARC
S4000 C3S1-SUB
S4000 C3S1-SUB
S4000 C3S1-SUB
S4000 C3S1-SUB
CP-07
CP-07
CP-07
CP-07
CP-0602
CP-0602
CP-0602
CP-0602
CP-0602
CP-0602
CP-0602
CP-0602

Check by
Plant Engineer

Check by
Engineer THAI
total
138.84 tons
279.77 tons
348.09 tons
255.85 kg
360.28 kg
622.95 kg
318.50 kg

SIKA 3006 ES

total
51.62 tons O-BASF 8320
92.83 tons
119.02 tons
0.00 kg
305.63 kg
0.00 kg

total
41.00 tons
82.60 tons
104.40 tons
0.00 kg
0.00 kg
451.00 kg

total
46.22 tons
104.34 tons
124.67 tons
255.85 kg
54.65 kg
171.95 kg
318.50 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 05/02/2021
Summary RQ
DATE Plant RQ NO Material QTY
05/02/2021 UCY BP-01 274122 CEMENT 4.83
05/02/2021 UCY BP-01 274123 SAND 9.20
05/02/2021 UCY BP-01 274124 STONE 10.33
05/02/2021 UCY BP-01 274125 O-BASF 8320 46.00
05/02/2021 UCY BP-01 274126 CEMENT 0.25
05/02/2021 UCY BP-01 274127 SAND 0.78
05/02/2021 UCY BP-01 274128 O-BASF 8320 1.50
05/02/2021 UCY BP-01 274129 CEMENT 1.38
05/02/2021 UCY BP-01 274130 SAND 2.52
05/02/2021 UCY BP-01 274131 STONE 3.10
05/02/2021 UCY BP-01 274132 O-BASF 8320 13.80
05/02/2021 UCY BP-02 274134 CEMENT 1.38
05/02/2021 UCY BP-02 274135 SAND 2.90
05/02/2021 UCY BP-02 274136 STONE 2.59
05/02/2021 UCY BP-02 274137 O-BASF 8320 11.50
05/02/2021 UCY BP-02 274138 CEMENT 4.83
05/02/2021 UCY BP-02 274139 SAND 9.20
05/02/2021 UCY BP-02 274140 STONE 10.36
05/02/2021 UCY BP-02 274141 O-BASF 8320 46.00
05/02/2021 UCY BP-02 274142 CEMENT 7.96
05/02/2021 UCY BP-02 274143 SAND 14.53
05/02/2021 UCY BP-02 274144 STONE 17.87
05/02/2021 UCY BP-02 274145 SIKA 3006 ES 47.74
05/02/2021 UCY BP-02 274146 CEMENT 5.61
05/02/2021 UCY BP-02 274147 SAND 11.80
05/02/2021 UCY BP-02 274148 STONE 13.40
05/02/2021 UCY BP-02 274149 O-BASF 8320 52.45
05/02/2021 UCY BP-02 274150 CEMENT 0.84
05/02/2021 UCY BP-02 274151 SAND 1.69
05/02/2021 UCY BP-02 274152 STONE 2.06
05/02/2021 UCY BP-02 274153 O-BASF 8320 8.40
05/02/2021 UCY BP-01 - CEMENT 14.45
05/02/2021 UCY BP-01 - SAND 26.65
05/02/2021 UCY BP-01 - STONE 33.91
05/02/2021 UCY BP-01 - SIKA 3006 ES 82.62
05/02/2021 UCY BP-01 - CEMENT 26.22
05/02/2021 UCY BP-01 - SAND 46.91
05/02/2021 UCY BP-01 - STONE 59.96
05/02/2021 UCY BP-01 - SIKA 3006 ES 157.32
Record BY
Operator
21
SUBJOB RECORDER
S4000 C3S4 CEMENT 67.75 tons
S4000 C3S4 SAND 126.18 tons
S4000 C3S4 STONE 153.58 tons
S4000 C3S4 SIKA 204 0.00 kg
S4000 C3S1 SIKA 3006 ES 287.68 kg
S4000 C3S1 O-BASF 8320 179.65 kg
S4000 C3S1 SIKA LATEX POWER 0.00 kg
S4000 C3S3
S4000 C3S3 UCY BP-01 UCY BP-02
S4000 C3S3 CEMENT 47.13 20.62
S4000 C3S3 SAND 86.06 40.12
28006 C3ML STONE 107.30 46.28
28006 C3ML SIKA 204 0.00 0.00
28006 C3ML SIKA 3006 ES 239.94 47.74
28006 C3ML O-BASF 8320 61.30 118.35
S4000 C3S4 SIKA LATEX POWER 0.00 0.00
S4000 C3S4
S4000 C3S4 CP-0602
S4000 C3S4
20103 TRAFFICM UCY BP-01 UCY BP-02
20103 TRAFFICM CEMENT 40.67 0.00
20103 TRAFFICM SAND 73.56 0.00
20103 TRAFFICM STONE 93.87 0.00
28003 C3ML SIKA 204 0.00 0.00
28003 C3ML SIKA 3006 ES 239.94 0.00
28003 C3ML O-BASF 8320 0.00 0.00
28003 C3ML
33003 C3S4
33003 C3S4 CP-07
33003 C3S4
33003 C3S4 UCY BP-01 UCY BP-02
CP-0602 CEMENT 0.00 0.00
CP-0602 SAND 0.00 0.00
CP-0602 STONE 0.00 0.00
CP-0602 SIKA 204 0.00 0.00
CP-0602 SIKA 3006 ES 0.00 0.00
CP-0602 O-BASF 8320 0.00 0.00
CP-0602
CP-0602
CP-03&04
UCY BP-01 UCY BP-02
CEMENT 6.46 20.62
SAND 12.50 40.12
STONE 13.43 46.28
SIKA 204 0.00 0.00
SIKA 3006 ES 0.00 47.74
O-BASF 8320 61.30 118.35
SIKA LATEX POWER 0.00 0.00

Check by
Plant Engineer

Check by
Engineer THAI
total
67.75 tons
126.18 tons
153.58 tons
0.00 kg
287.68 kg
179.65 kg
0.00 kg

SIKA 3006 ES

total
40.67 tons O-BASF 8320
73.56 tons
93.87 tons
0.00 kg
239.94 kg
0.00 kg

total
0.00 tons
0.00 tons
0.00 tons
0.00 kg
0.00 kg
0.00 kg
total
27.08 tons
52.62 tons
59.71 tons
0.00 kg
47.74 kg
179.65 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 06/02/2021
Summary RQ
DATE Plant RQ NO Material QTY
6/2/2021 UCY BP-01 274154 CEMENT 0.21
6/2/2021 UCY BP-01 274155 SAND 0.42
6/2/2021 UCY BP-01 274156 STONE 0.52
6/2/2021 UCY BP-01 274157 O-BASF 8320 2.10
6/2/2021 UCY BP-01 274158 CEMENT 7.36
6/2/2021 UCY BP-01 274159 SAND 13.41
6/2/2021 UCY BP-01 274160 STONE 16.53
6/2/2021 UCY BP-01 274161 SIKA 3006 ES 44.16
6/2/2021 UCY BP-01 274162 CEMENT 1.39
6/2/2021 UCY BP-01 274163 SAND 2.99
6/2/2021 UCY BP-01 274164 STONE 3.57
6/2/2021 UCY BP-01 274165 O-BASF 8320 12.55
6/2/2021 UCY BP-02 274166 CEMENT 10.31
6/2/2021 UCY BP-02 274167 SAND 21.01
6/2/2021 UCY BP-02 274168 STONE 24.79
6/2/2021 UCY BP-02 274169 O-BASF 8320 100.80
6/2/2021 UCY BP-02 274170 CEMENT 2.96
6/2/2021 UCY BP-02 274171 SAND 6.27
6/2/2021 UCY BP-02 274172 STONE 6.71
6/2/2021 UCY BP-02 274173 O-BASF 8320 27.30
6/2/2021 UCY BP-02 274174 CEMENT 13.18
6/2/2021 UCY BP-02 274175 SAND 32.88
6/2/2021 UCY BP-02 274176 STONE 40.22
6/2/2021 UCY BP-02 274177 O-BASF 8320 181.30
6/2/2021 UCY BP-02 274178 CEMENT 6.23
6/2/2021 UCY BP-02 274179 SAND 12.12
6/2/2021 UCY BP-02 274180 STONE 12.94
6/2/2021 UCY BP-02 274181 O-BASF 8320 57.50
6/2/2021 UCY BP-02 274182 CEMENT 25.63
6/2/2021 UCY BP-02 274183 SAND 51.88
6/2/2021 UCY BP-02 274184 STONE 65.31
6/2/2021 UCY BP-02 274185 O-BASF 8320 281.88
6/2/2021 UCY BP-01 - CEMENT 58.82
6/2/2021 UCY BP-01 - SAND 105.99
6/2/2021 UCY BP-01 - STONE 156.09
6/2/2021 UCY BP-01 - SIKA 3006 ES 346.80
Record BY
Operator
21
SUBJOB RECORDER
S4000 C3S1-SUB CEMENT 126.09 tons
S4000 C3S1-SUB SAND 246.97 tons
S4000 C3S1-SUB STONE 326.68 tons
S4000 C3S1-SUB SIKA 204 0.00 kg
20103 TRAFFICM SIKA 3006 ES 390.96 kg
20103 TRAFFICM O-BASF 8320 663.43 kg
20103 TRAFFICM SIKA LATEX POWER 0.00 kg
20103 TRAFFICM
28003 C3ML-SUB UCY BP-01 UCY BP-02
28003 C3ML-SUB CEMENT 67.78 58.31
28003 C3ML-SUB SAND 122.81 124.16
28003 C3ML-SUB STONE 176.71 149.97
28003 C3ML-SUB SIKA 204 0.00 0.00
28003 C3ML-SUB SIKA 3006 ES 390.96 0.00
28003 C3ML-SUB O-BASF 8320 14.65 648.78
28003 C3ML-SUB SIKA LATEX POWER 0.00 0.00
S4000 C3S2-SUB
S4000 C3S2-SUB CP-0602
S4000 C3S2-SUB
S4000 C3S2-SUB UCY BP-01 UCY BP-02
31002 C3S3-ARC CEMENT 58.82 0.00
31002 C3S3-ARC SAND 105.99 0.00
31002 C3S3-ARC STONE 156.09 0.00
31002 C3S3-ARC SIKA 204 0.00 0.00
S4000 C3S4-SUB SIKA 3006 ES 346.80 0.00
S4000 C3S4-SUB O-BASF 8320 0.00 0.00
S4000 C3S4-SUB
S4000 C3S4-SUB
CP-07 CP-07
CP-07
CP-07 UCY BP-01 UCY BP-02
CP-07 CEMENT 0.00 25.63
CP-0602 SAND 0.00 51.88
CP-0602 STONE 0.00 65.31
CP-0602 SIKA 204 0.00 0.00
CP-0602 SIKA 3006 ES 0.00 0.00
O-BASF 8320 0.00 281.88

CP-03&04
UCY BP-01 UCY BP-02
CEMENT 8.96 32.68
SAND 16.82 72.28
STONE 20.62 84.66
SIKA 204 0.00 0.00
SIKA 3006 ES 44.16 0.00
O-BASF 8320 14.65 366.90
SIKA LATEX POWER 0.00 0.00

Check by
Plant Engineer

Check by
Engineer THAI
total
126.09 tons
246.97 tons
326.68 tons
0.00 kg
390.96 kg
663.43 kg
0.00 kg

SIKA 3006 ES

total
58.82 tons O-BASF 8320
105.99 tons
156.09 tons
0.00 kg
346.80 kg
0.00 kg

total
25.63 tons
51.88 tons
65.31 tons
0.00 kg
0.00 kg
281.88 kg
total
41.64 tons
89.10 tons
105.28 tons
0.00 kg
44.16 kg
381.55 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 07/02/2021
Summary RQ
DATE Plant RQ NO Material QTY
7/2/2021 UCY BP-01 246133 CEMENT 1.91
7/2/2021 UCY BP-01 246134 SAND 4.18
7/2/2021 UCY BP-01 246135 STONE 4.15
7/2/2021 UCY BP-01 246136 O-BASF 8320 16.80
7/2/2021 UCY BP-01 246137 CEMENT 1.72
7/2/2021 UCY BP-01 246138 SAND 3.71
7/2/2021 UCY BP-01 246139 STONE 4.42
7/2/2021 UCY BP-01 246140 O-BASF 8320 15.50
7/2/2021 UCY BP-01 246141 CEMENT 0.63
7/2/2021 UCY BP-01 246142 SAND 1.27
7/2/2021 UCY BP-01 246143 STONE 1.55
7/2/2021 UCY BP-01 246144 O-BASF 8320 6.30
7/2/2021 UCY BP-02 246145 CEMENT 10.31
7/2/2021 UCY BP-02 246146 SAND 21.08
7/2/2021 UCY BP-02 246147 STONE 24.86
7/2/2021 UCY BP-02 246148 O-BASF 8320 100.80
7/2/2021 UCY BP-02 246149 CEMENT 0.69
7/2/2021 UCY BP-02 246150 SAND 1.26
7/2/2021 UCY BP-02 246151 STONE 1.55
7/2/2021 UCY BP-02 246152 O-BASF 8320 6.90
7/2/2021 UCY BP-02 246153 CEMENT 37.72
7/2/2021 UCY BP-02 246154 SAND 76.54
7/2/2021 UCY BP-02 246155 STONE 96.14
7/2/2021 UCY BP-02 246156 O-BASF 8320 414.92
7/2/2021 UCY BP-01 246157 CEMENT 60.95
7/2/2021 UCY BP-01 246158 SAND 108.78
7/2/2021 UCY BP-01 246159 STONE 139.26
7/2/2021 UCY BP-01 246160 SIKA 3006 ES 365.70
7/2/2021 UCY BP-02 246161 CEMENT 2.72
7/2/2021 UCY BP-02 246162 SAND 5.62
7/2/2021 UCY BP-02 246163 STONE 7.09
7/2/2021 UCY BP-02 246164 SIKA 3006 ES 12.24
Record BY
Operator
21
SUBJOB RECORDER
S4000 C3S4-SUB CEMENT 116.65 tons
S4000 C3S4-SUB SAND 222.44 tons
S4000 C3S4-SUB STONE 279.02 tons
S4000 C3S4-SUB SIKA 204 0.00 kg
28003 C3ML SIKA 3006 ES 377.94 kg
28003 C3ML O-BASF 8320 561.22 kg
28003 C3ML SIKA LATEX POWER 0.00 kg
28003 C3ML
33003 C3S4-ARC UCY BP-01 UCY BP-02
33003 C3S4-ARC CEMENT 65.21 51.44
33003 C3S4-ARC SAND 117.94 104.50
33003 C3S4-ARC STONE 149.38 129.64
28003 C3ML SUB SIKA 204 0.00 0.00
28003 C3ML SUB SIKA 3006 ES 365.70 12.24
28003 C3ML SUB O-BASF 8320 38.60 522.62
28003 C3ML SUB SIKA LATEX POWER 0.00 0.00
28006 C3ML-SUB
28006 C3ML-SUB CP-0602
28006 C3ML-SUB
28006 C3ML-SUB UCY BP-01 UCY BP-02
CP-07 CEMENT 60.95 2.72
CP-07 SAND 108.78 5.62
CP-07 STONE 139.26 7.09
CP-07 SIKA 204 0.00 0.00
CP-0602 SIKA 3006 ES 365.70 12.24
CP-0602 O-BASF 8320 0.00 0.00
CP-0602
CP-0602
CP-0602 CP-07
CP-0602
CP-0602 UCY BP-01 UCY BP-02
CP-0602 CEMENT 0.00 37.72
SAND 0.00 76.54
STONE 0.00 96.14
SIKA 204 0.00 0.00
SIKA 3006 ES 0.00 0.00
O-BASF 8320 0.00 414.92

CP-03&04
UCY BP-01 UCY BP-02
CEMENT 4.26 11.00
SAND 9.16 22.34
STONE 10.12 26.41
SIKA 204 0.00 0.00
SIKA 3006 ES 0.00 0.00
O-BASF 8320 38.60 107.70
SIKA LATEX POWER 0.00 0.00

Check by
Plant Engineer

Check by
Engineer THAI
total
116.65 tons
222.44 tons
279.02 tons
0.00 kg
377.94 kg
561.22 kg
0.00 kg

SIKA 3006 ES

total
63.67 tons O-BASF 8320
114.40 tons
146.35 tons
0.00 kg
377.94 kg
0.00 kg

total
37.72 tons
76.54 tons
96.14 tons
0.00 kg
0.00 kg
414.92 kg
total
15.26 tons
31.50 tons
36.53 tons
0.00 kg
0.00 kg
146.30 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 08/02/2021
Summary RQ
DATE Plant RQ NO Material QTY
8/2/2021 UCY BP-01 273485 CEMENT 28.41
8/2/2021 UCY BP-01 273486 SAND 70.43
8/2/2021 UCY BP-01 273487 STONE 87.75
8/2/2021 UCY BP-01 273488 O-BASF 8320 394.45
8/2/2021 UCY BP-01 273489 SIKA LATEX POWER 563.50
8/2/2021 UCY BP-02 273490 CEMENT 7.16
8/2/2021 UCY BP-02 273491 SAND 14.76
8/2/2021 UCY BP-02 273492 STONE 17.06
8/2/2021 UCY BP-02 273493 O-BASF 8320 69.30
8/2/2021 UCY BP-02 273494 CEMENT 5.14
8/2/2021 UCY BP-02 273495 SAND 10.44
8/2/2021 UCY BP-02 273496 STONE 10.86
8/2/2021 UCY BP-02 273497 O-BASF 8320 48.20
8/2/2021 UCY BP-02 273498 CEMENT 1.29
8/2/2021 UCY BP-02 273499 SAND 2.34
8/2/2021 UCY BP-02 273500 STONE 2.90
8/2/2021 UCY BP-02 246153 SIKA 3006 ES 7.73
8/2/2021 UCY BP-02 246154 CEMENT 1.35
8/2/2021 UCY BP-02 246155 SAND 2.89
8/2/2021 UCY BP-02 246156 STONE 3.47
8/2/2021 UCY BP-02 246157 O-BASF 8320 12.18
8/2/2021 UCY BP-02 246158 CEMENT 2.73
8/2/2021 UCY BP-02 246159 SAND 5.50
8/2/2021 UCY BP-02 246160 STONE 6.72
8/2/2021 UCY BP-02 246161 O-BASF 8320 27.30
8/2/2021 UCY BP-02 246162 CEMENT 0.63
8/2/2021 UCY BP-02 246163 SAND 1.27
8/2/2021 UCY BP-02 246164 STONE 1.55
8/2/2021 UCY BP-02 246165 O-BASF 8320 6.30
8/2/2021 UCY BP-02 246166 CEMENT 1.68
8/2/2021 UCY BP-02 246167 SAND 3.38
8/2/2021 UCY BP-02 246168 STONE 4.14
8/2/2021 UCY BP-02 246169 O-BASF 8320 16.80
8/2/2021 UCY BP-01 - CEMENT 8.20
8/2/2021 UCY BP-01 - SAND 16.48
8/2/2021 UCY BP-01 - STONE 20.84
8/2/2021 UCY BP-01 - O-BASF 8320 90.20
8/2/2021 UCY BP-02 - CEMENT 25.22
8/2/2021 UCY BP-02 - SAND 50.68
8/2/2021 UCY BP-02 - STONE 64.51
8/2/2021 UCY BP-02 - O-BASF 8320 277.37
8/2/2021 UCY BP-02 - CEMENT 10.31
8/2/2021 UCY BP-02 - SAND 19.07
8/2/2021 UCY BP-02 - STONE 24.55
8/2/2021 UCY BP-02 - SIKA 3006 ES 57.78
8/2/2021 UCY BP-01 - CEMENT 47.38
8/2/2021 UCY BP-01 - SAND 84.05
8/2/2021 UCY BP-01 - STONE 108.97
8/2/2021 UCY BP-01 - SIKA 3006 ES 284.28

Record BY
Operator
21
SUBJOB RECORDER
33003 C3S1 ARC CEMENT 139.50 tons
33003 C3S1 ARC SAND 281.29 tons
33003 C3S1 ARC STONE 353.32 tons
33003 C3S1 ARC SIKA 204 0.00 kg
33003 C3S1 ARC SIKA 3006 ES 349.79 kg
28003 C3ML-SUB O-BASF 8320 942.10 kg
28003 C3ML-SUB SIKA LATEX POWER 563.50 kg
28003 C3ML-SUB
28003 C3ML-SUB UCY BP-01 UCY BP-02
S4000-C3S4-SUB CEMENT 83.99 55.51
S4000-C3S4-SUB SAND 170.96 110.33
S4000-C3S4-SUB STONE 217.56 135.76
S4000-C3S4-SUB SIKA 204 0.00 0.00
28001 SP-A-SUP SIKA 3006 ES 284.28 65.51
28001 SP-A-SUP O-BASF 8320 484.65 457.45
28001 SP-A-SUP SIKA LATEX POWER 563.50 0.00
28001 SP-A-SUP
24000 C3ML-SUB CP-0602
24000 C3ML-SUB
24000 C3ML-SUB UCY BP-01 UCY BP-02
24000 C3ML-SUB CEMENT 47.38 10.31
S4000-C3S1-SUB SAND 84.05 19.07
S4000-C3S1-SUB STONE 108.97 24.55
S4000-C3S1-SUB SIKA 204 0.00 0.00
S4000-C3S1-SUB SIKA 3006 ES 284.28 57.78
33003 C3S2-ARC O-BASF 8320 0.00 0.00
33003 C3S2-ARC
33003 C3S2-ARC
33003 C3S2-ARC CP-07
33003 C3S3-ARC
33003 C3S3-ARC UCY BP-01 UCY BP-02
33003 C3S3-ARC CEMENT 8.20 25.22
33003 C3S3-ARC SAND 16.48 50.68
CP-07 STONE 20.84 64.51
CP-07 SIKA 204 0.00 0.00
CP-07 SIKA 3006 ES 0.00 0.00
CP-07 O-BASF 8320 90.20 277.37
CP-07
CP-07
CP-07 CP-03&04
CP-07
CP-0602 UCY BP-01 UCY BP-02
CP-0602 CEMENT 28.41 19.98
CP-0602 SAND 70.43 40.58
CP-0602 STONE 87.75 46.70
CP-0602 SIKA 204 0.00 0.00
CP-0602 SIKA 3006 ES 0.00 7.73
CP-0602 O-BASF 8320 394.45 180.08
CP-0602 SIKA LATEX POWER 563.50 0.00

Check by
Plant Engineer

Check by
Engineer THAI
total
139.50 tons
281.29 tons
353.32 tons
0.00 kg
349.79 kg
942.10 kg
563.50 kg

SIKA 3006 ES

total
57.69 tons O-BASF 8320
103.12 tons
133.52 tons
0.00 kg
342.06 kg
0.00 kg

total
33.42 tons
67.16 tons
85.35 tons
0.00 kg
0.00 kg
367.57 kg
total
48.39 tons
111.01 tons
134.45 tons
0.00 kg
7.73 kg
574.53 kg
563.50 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 09/02/2021
Summary RQ
DATE Plant RQ NO Material QTY
9/2/2021 UCY BP-01 246170 CEMENT 21.22
9/2/2021 UCY BP-01 246171 SAND 52.82
9/2/2021 UCY BP-01 246172 STONE 65.34
9/2/2021 UCY BP-01 246173 O-BASF 8320 294.00
9/2/2021 UCY BP-01 246174 SIKA LATEX POWER 420.00
9/2/2021 UCY BP-01 246175 CEMENT 9.51
9/2/2021 UCY BP-01 246176 SAND 23.78
9/2/2021 UCY BP-01 246177 STONE 28.86
9/2/2021 UCY BP-01 246178 O-BASF 8320 129.85
9/2/2021 UCY BP-01 246179 SIKA LATEX POWER 185.50
9/2/2021 UCY BP-01 246180 CEMENT 0.25
9/2/2021 UCY BP-01 246181 SAND 0.78
9/2/2021 UCY BP-01 246182 O-BASF 8320 1.50
9/2/2021 UCY BP-02 246183 CEMENT 7.36
9/2/2021 UCY BP-02 246184 SAND 13.36
9/2/2021 UCY BP-02 246185 STONE 16.56
9/2/2021 UCY BP-02 246186 SIKA 3006 ES 44.16
9/2/2021 UCY BP-02 246187 CEMENT 1.84
9/2/2021 UCY BP-02 246188 SAND 3.34
9/2/2021 UCY BP-02 246189 STONE 4.14
9/2/2021 UCY BP-02 246190 SIKA 3006 ES 11.04
9/2/2021 UCY BP-02 246191 CEMENT 1.38
9/2/2021 UCY BP-02 246192 SAND 2.51
9/2/2021 UCY BP-02 246193 STONE 3.11
9/2/2021 UCY BP-02 246194 O-BASF 8320 13.80
9/2/2021 UCY BP-02 246195 CEMENT 1.05
9/2/2021 UCY BP-02 246196 SAND 2.10
9/2/2021 UCY BP-02 246197 STONE 2.59
9/2/2021 UCY BP-02 246198 O-BASF 8320 10.50
9/2/2021 UCY BP-01 - CEMENT 9.43
9/2/2021 UCY BP-01 - SAND 18.95
9/2/2021 UCY BP-01 - STONE 23.97
9/2/2021 UCY BP-01 - O-BASF 8320 103.73
9/2/2021 UCY BP-02 - CEMENT 10.87
9/2/2021 UCY BP-02 - SAND 22.10
9/2/2021 UCY BP-02 - STONE 27.69
9/2/2021 UCY BP-02 - O-BASF 8320 119.52
9/2/2021 UCY BP-02 - CEMENT 12.15
9/2/2021 UCY BP-02 - SAND 22.41
9/2/2021 UCY BP-02 - STONE 28.65
9/2/2021 UCY BP-02 - SIKA 3006 ES 68.82
9/2/2021 UCY BP-01 - CEMENT 51.75
9/2/2021 UCY BP-01 - SAND 92.25
9/2/2021 UCY BP-01 - STONE 118.35
9/2/2021 UCY BP-01 - SIKA 3006 ES 310.50

Record BY
Operator
21
SUBJOB RECORDER
S4000-C3S3-SUB CEMENT 126.81 tons
S4000-C3S3-SUB SAND 254.40 tons
S4000-C3S3-SUB STONE 319.26 tons
S4000-C3S3-SUB SIKA 204 0.00 kg
S4000-C3S3-SUB SIKA 3006 ES 434.52 kg
S4000-C3S1-SUB O-BASF 8320 672.90 kg
S4000-C3S1-SUB SIKA LATEX POWER 605.50 kg
S4000-C3S1-SUB
S4000-C3S1-SUB UCY BP-01 UCY BP-02
S4000-C3S1-SUB CEMENT 92.16 34.65
S4000-C3S2-SUB SAND 188.58 65.82
S4000-C3S2-SUB STONE 236.52 82.74
S4000-C3S2-SUB SIKA 204 0.00 0.00
20103-TRAFFICM SIKA 3006 ES 310.50 124.02
20103-TRAFFICM O-BASF 8320 529.08 143.82
20103-TRAFFICM SIKA LATEX POWER 605.50 0.00
20103-TRAFFICM
28001-SP-A-SUP CP-0602
28001-SP-A-SUP
28001-SP-A-SUP UCY BP-01 UCY BP-02
28001-SP-A-SUP CEMENT 51.75 12.15
62101-C3ML-SUB SAND 92.25 22.41
62101-C3ML-SUB STONE 118.35 28.65
62101-C3ML-SUB SIKA 204 0.00 0.00
62101-C3ML-SUB SIKA 3006 ES 310.50 68.82
S4000-C3S2-SUB O-BASF 8320 0.00 0.00
S4000-C3S2-SUB
S4000-C3S2-SUB
S4000-C3S2-SUB CP-07
CP-07
CP-07 UCY BP-01 UCY BP-02
CP-07 CEMENT 9.43 10.87
CP-07 SAND 18.95 22.10
CP-07 STONE 23.97 27.69
CP-07 SIKA 204 0.00 0.00
CP-07 SIKA 3006 ES 0.00 0.00
CP-07 O-BASF 8320 103.73 119.52
CP-0602
CP-0602
CP-0602 CP-03&04
CP-0602
CP-0602 UCY BP-01 UCY BP-02
CP-0602 CEMENT 30.98 11.63
CP-0602 SAND 77.38 21.31
CP-0602 STONE 94.20 26.40
SIKA 204 0.00 0.00
SIKA 3006 ES 0.00 55.20
O-BASF 8320 425.35 24.30
SIKA LATEX POWER 605.50 0.00

Check by
Plant Engineer

Check by
Engineer THAI
total
126.81 tons
254.40 tons
319.26 tons
0.00 kg
434.52 kg
672.90 kg
605.50 kg

SIKA 3006 ES

total
63.90 tons O-BASF 8320
114.66 tons
147.00 tons
0.00 kg
379.32 kg
0.00 kg

total
20.30 tons
41.05 tons
51.66 tons
0.00 kg
0.00 kg
223.25 kg
total
42.61 tons
98.69 tons
120.60 tons
0.00 kg
55.20 kg
449.65 kg
605.50 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 10/02/2021
Summary RQ
DATE Plant RQ NO Material QTY
10/02/2021 UCY BP-01 274202 CEMENT 7.91
10/02/2021 UCY BP-01 274203 SAND 14.43
10/02/2021 UCY BP-01 274204 STONE 17.77
10/02/2021 UCY BP-01 274205 SIKA LATEX POWER 47.47
10/02/2021 UCY BP-02 274206 CEMENT 0.23
10/02/2021 UCY BP-02 274207 SAND 0.80
10/02/2021 UCY BP-02 274208 CEMENT 10.50
10/02/2021 UCY BP-02 274209 SAND 26.07
10/02/2021 UCY BP-02 274210 STONE 32.64
10/02/2021 UCY BP-02 274211 O-BASF 8320 147.00
10/02/2021 UCY BP-02 274212 CEMENT 8.63
10/02/2021 UCY BP-02 274213 SAND 17.66
10/02/2021 UCY BP-02 274214 STONE 20.66
10/02/2021 UCY BP-02 274215 O-BASF 8320 84.00
10/02/2021 UCY BP-02 274216 CEMENT 0.25
10/02/2021 UCY BP-02 274217 SAND 0.79
10/02/2021 UCY BP-02 274218 O-BASF 8320 1.50
10/02/2021 UCY BP-02 274219 CEMENT 1.72
10/02/2021 UCY BP-02 274220 SAND 3.70
10/02/2021 UCY BP-02 274221 STONE 4.41
10/02/2021 UCY BP-02 274222 O-BASF 8320 15.50
10/02/2021 UCY BP-02 274223 CEMENT 0.84
10/02/2021 UCY BP-02 274224 SAND 1.69
10/02/2021 UCY BP-02 274225 STONE 2.07
10/02/2021 UCY BP-02 274226 O-BASF 8320 8.40
10/02/2021 UCY BP-02 274227 CEMENT 0.92
10/02/2021 UCY BP-02 274228 SAND 1.68
10/02/2021 UCY BP-02 274229 STONE 2.07
10/02/2021 UCY BP-02 274230 O-BASF 8320 9.20
10/02/2021 UCY BP-02 274231 CEMENT 0.46
10/02/2021 UCY BP-02 274232 SAND 0.84
10/02/2021 UCY BP-02 274233 STONE 1.03
10/02/2021 UCY BP-02 274234 O-BASF 8320 4.60
10/02/2021 UCY BP-02 274235 CEMENT 1.38
10/02/2021 UCY BP-02 274236 SAND 2.52
10/02/2021 UCY BP-02 274237 STONE 3.09
10/02/2021 UCY BP-02 274238 O-BASF 8320 13.80
10/02/2021 UCY BP-01 CEMENT 26.65
10/02/2021 UCY BP-01 SAND 53.95
10/02/2021 UCY BP-01 STONE 67.93
10/02/2021 UCY BP-01 O-BASF 8320 266.50
10/02/2021 UCY BP-02 CEMENT 0.62
10/02/2021 UCY BP-02 SAND 1.25
10/02/2021 UCY BP-02 STONE 1.57
10/02/2021 UCY BP-02 O-BASF 8320 6.77
10/02/2021 UCY BP-02 CEMENT 57.82
10/02/2021 UCY BP-02 SAND 102.95
10/02/2021 UCY BP-02 STONE 132.36
10/02/2021 UCY BP-02 SIKA 3006 ES 346.23

Record BY
Operator
21
SUBJOB RECORDER
20103 TRAFFICM CEMENT 117.93 tons
20103 TRAFFICM SAND 228.33 tons
20103 TRAFFICM STONE 285.60 tons
20103 TRAFFICM SIKA 204 0.00 kg
31002 C3S4-ARC SIKA 3006 ES 346.23 kg
31002 C3S4-ARC O-BASF 8320 557.27 kg
31002 C3S4-ARC SIKA LATEX POWER 47.47 kg
31002 C3S4-ARC
31002 C3S4-ARC UCY BP-01 UCY BP-02
31002 C3S4-ARC CEMENT 34.56 83.37
S4000-C3S3-SUB SAND 68.38 159.95
S4000-C3S3-SUB STONE 85.70 199.90
S4000-C3S3-SUB SIKA 204 0.00 0.00
S4000-C3S3-SUB SIKA 3006 ES 0.00 346.23
S4000-C3S1-SUB O-BASF 8320 266.50 290.77
S4000-C3S1-SUB SIKA LATEX POWER 47.47 0.00
S4000-C3S1-SUB
28003-C3ML-SUB CP-0602
28003-C3ML-SUB
28003-C3ML-SUB UCY BP-01 UCY BP-02
28003-C3ML-SUB CEMENT 0.00 57.82
33003-C3S2-ARC SAND 0.00 102.95
33003-C3S2-ARC STONE 0.00 132.36
33003-C3S2-ARC SIKA 204 0.00 0.00
33003-C3S2-ARC SIKA 3006 ES 0.00 346.23
28006-C3ML-SUB O-BASF 8320 0.00 0.00
28006-C3ML-SUB
28006-C3ML-SUB
28006-C3ML-SUB CP-07
28002-SP-A-SUP
28002-SP-A-SUP UCY BP-01 UCY BP-02
28002-SP-A-SUP CEMENT 26.65 0.62
28002-SP-A-SUP SAND 53.95 1.25
S4000-C3S2-SUB STONE 67.93 1.57
S4000-C3S2-SUB SIKA 204 0.00 0.00
S4000-C3S2-SUB SIKA 3006 ES 0.00 0.00
S4000-C3S2-SUB O-BASF 8320 266.50 6.77
CP-07
CP-07
CP-07 CP-03&04
CP-07
CP-07 UCY BP-01 UCY BP-02
CP-07 CEMENT 7.91 24.93
CP-07 SAND 14.43 55.75
CP-07 STONE 17.77 65.97
CP-0602 SIKA 204 0.00 0.00
CP-0602 SIKA 3006 ES 0.00 0.00
CP-0602 O-BASF 8320 0.00 284.00
CP-0602 SIKA LATEX POWER 47.47 0.00

Check by
Plant Engineer

Check by
Engineer THAI
total
117.93 tons
228.33 tons
285.60 tons
0.00 kg
346.23 kg
557.27 kg
47.47 kg

SIKA 3006 ES

total
57.82 tons O-BASF 8320
102.95 tons
132.36 tons
0.00 kg
346.23 kg
0.00 kg

total
27.27 tons
55.20 tons
69.50 tons
0.00 kg
0.00 kg
273.27 kg
total
32.84 tons
70.18 tons
83.74 tons
0.00 kg
0.00 kg
284.00 kg
47.47 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 11/02/2021
Summary RQ
DATE Plant RQ NO Material QTY
11/02/2021 UCY BP-01 274239 CEMENT 2.12
11/02/2021 UCY BP-01 274240 SAND 3.83
11/02/2021 UCY BP-01 274241 STONE 4.77
11/02/2021 UCY BP-01 274242 SIKA 3006 ES 12.70
11/02/2021 UCY BP-02 274243 CEMENT 3.21
11/02/2021 UCY BP-02 274244 SAND 8.18
11/02/2021 UCY BP-02 274245 STONE 9.25
11/02/2021 UCY BP-02 274246 O-BASF 8320 41.65
11/02/2021 UCY BP-02 274247 CEMENT 14.74
11/02/2021 UCY BP-02 274248 SAND 36.82
11/02/2021 UCY BP-02 274249 STONE 45.15
11/02/2021 UCY BP-02 274250 O-BASF 8320 203.35
11/02/2021 UCY BP-02 274251 CEMENT 1.35
11/02/2021 UCY BP-02 274252 SAND 2.88
11/02/2021 UCY BP-02 274253 STONE 3.47
11/02/2021 UCY BP-02 274254 O-BASF 8320 12.18
11/02/2021 UCY BP-02 274255 CEMENT 28.05
11/02/2021 UCY BP-02 274256 SAND 57.02
11/02/2021 UCY BP-02 274257 STONE 67.21
11/02/2021 UCY BP-02 274258 O-BASF 8320 277.50
11/02/2021 UCY BP-01 - CEMENT 6.56
11/02/2021 UCY BP-01 - SAND 13.09
11/02/2021 UCY BP-01 - STONE 16.70
11/02/2021 UCY BP-01 - SIKA 204 72.16
11/02/2021 UCY BP-02 - CEMENT 20.09
11/02/2021 UCY BP-02 - SAND 40.77
11/02/2021 UCY BP-02 - STONE 51.21
11/02/2021 UCY BP-02 - SIKA 3006 ES 220.99
11/02/2021 UCY BP-02 - CEMENT 54.97
11/02/2021 UCY BP-02 - SAND 97.99
11/02/2021 UCY BP-02 - STONE 125.95
11/02/2021 UCY BP-02 - SIKA 3006 ES 329.82
Record BY
Operator
21
SUBJOB RECORDER
28001-SP-A-SUP CEMENT 131.09 tons
28001-SP-A-SUP SAND 260.58 tons
28001-SP-A-SUP STONE 323.71 tons
28001-SP-A-SUP SIKA 204 72.16 kg
31002 C3S3-ARC SIKA 3006 ES 563.51 kg
31002 C3S3-ARC O-BASF 8320 534.68 kg
31002 C3S3-ARC SIKA LATEX POWER 0.00 kg
31002 C3S3-ARC
31002 C3S1-ARC UCY BP-01 UCY BP-02
31002 C3S1-ARC CEMENT 8.68 122.41
31002 C3S1-ARC SAND 16.92 243.66
31002 C3S1-ARC STONE 21.47 302.24
24000 C3ML-SUB SIKA 204 72.16 0.00
24000 C3ML-SUB SIKA 3006 ES 12.70 550.81
24000 C3ML-SUB O-BASF 8320 0.00 534.68
24000 C3ML-SUB SIKA LATEX POWER 0.00 0.00
S4000 C3S4-SUB
S4000 C3S4-SUB CP-0602
S4000 C3S4-SUB
S4000 C3S4-SUB UCY BP-01 UCY BP-02
CP-07 CEMENT 0.00 54.97
CP-07 SAND 0.00 97.99
CP-07 STONE 0.00 125.95
CP-07 SIKA 204 0.00 0.00
CP-07 SIKA 3006 ES 0.00 329.82
CP-07 O-BASF 8320 0.00 0.00
CP-07
CP-07
CP-0602 CP-07
CP-0602
CP-0602 UCY BP-01 UCY BP-02
CP-0602 CEMENT 6.56 20.09
SAND 13.09 40.77
STONE 16.70 51.21
SIKA 204 72.16 0.00
SIKA 3006 ES 0.00 220.99
O-BASF 8320 0.00 0.00

CP-03&04
UCY BP-01 UCY BP-02
CEMENT 2.12 47.35
SAND 3.83 104.90
STONE 4.77 125.08
SIKA 204 0.00 0.00
SIKA 3006 ES 12.70 0.00
O-BASF 8320 0.00 534.68
SIKA LATEX POWER 0.00 0.00

Check by
Plant Engineer

Check by
Engineer THAI
total
131.09 tons
260.58 tons
323.71 tons
72.16 kg
563.51 kg
534.68 kg
0.00 kg

SIKA 3006 ES

total
54.97 tons O-BASF 8320
97.99 tons
125.95 tons
0.00 kg
329.82 kg
0.00 kg

total
26.65 tons
53.86 tons
67.91 tons
72.16 kg
220.99 kg
0.00 kg
total
49.47 tons
108.73 tons
129.85 tons
0.00 kg
12.70 kg
534.68 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 12/02/2021
Summary RQ
DATE Plant RQ NO Material QTY
12/02/2021 UCY BP-01 274259 CEMENT 2.16
12/02/2021 UCY BP-01 274260 SAND 3.92
12/02/2021 UCY BP-01 274261 STONE 4.86
12/02/2021 UCY BP-01 274262 SIKA 3006 ES 12.97
12/02/2021 UCY BP-02 274263 CEMENT 55.86
12/02/2021 UCY BP-02 274264 SAND 111.86
12/02/2021 UCY BP-02 274265 STONE 137.53
12/02/2021 UCY BP-02 274266 O-BASF 8320 409.50
12/02/2021 UCY BP-02 274267 SIKA 204 149.10
12/02/2021 UCY BP-02 274268 CEMENT 0.74
12/02/2021 UCY BP-02 274269 SAND 1.33
12/02/2021 UCY BP-02 274270 STONE 1.66
12/02/2021 UCY BP-02 274271 SIKA 3006 ES 4.42
12/02/2021 UCY BP-02 274272 CEMENT 1.24
12/02/2021 UCY BP-02 274273 SAND 2.25
12/02/2021 UCY BP-02 274274 STONE 2.79
12/02/2021 UCY BP-02 274275 SIKA 3006 ES 7.45
12/02/2021 UCY BP-02 274276 CEMENT 2.45
12/02/2021 UCY BP-02 274277 SAND 3.86
12/02/2021 UCY BP-02 274278 STONE 5.15
12/02/2021 UCY BP-02 274279 SIKA 204 29.40
12/02/2021 UCY BP-02 274280 CEMENT 3.15
12/02/2021 UCY BP-02 274281 SAND 7.81
12/02/2021 UCY BP-02 274282 STONE 9.78
12/02/2021 UCY BP-02 274283 SIKA 204 44.10
12/02/2021 UCY BP-02 274284 CEMENT 1.72
12/02/2021 UCY BP-02 274285 SAND 3.68
12/02/2021 UCY BP-02 274286 STONE 4.41
12/02/2021 UCY BP-02 274287 SIKA 204 15.50
12/02/2021 UCY BP-02 - CEMENT 41.40
12/02/2021 UCY BP-02 - SAND 73.80
12/02/2021 UCY BP-02 - STONE 94.59
12/02/2021 UCY BP-02 - SIKA 3006 ES 248.40
Record BY
Operator
21
SUBJOB RECORDER
28001 SP-A-SUP CEMENT 108.72 tons
28001 SP-A-SUP SAND 208.51 tons
28001 SP-A-SUP STONE 260.77 tons
28001 SP-A-SUP SIKA 204 238.10 kg
S4000 C3S4-SUB SIKA 3006 ES 273.24 kg
S4000 C3S4-SUB O-BASF 8320 409.50 kg
S4000 C3S4-SUB SIKA LATEX POWER 0.00 kg
S4000 C3S4-SUB
S4000 C3S4-SUB UCY BP-01 UCY BP-02
20103-TRAFFICM CEMENT 2.16 106.56
20103-TRAFFICM SAND 3.92 204.59
20103-TRAFFICM STONE 4.86 255.91
20103-TRAFFICM SIKA 204 0.00 238.10
28001 SP-A-SUP SIKA 3006 ES 12.97 260.27
28001 SP-A-SUP O-BASF 8320 0.00 409.50
28001 SP-A-SUP SIKA LATEX POWER 0.00 0.00
28001 SP-A-SUP
24000 C4ML-SUB CP-0602
24000 C4ML-SUB
24000 C4ML-SUB UCY BP-01 UCY BP-02
24000 C4ML-SUB CEMENT 0.00 41.40
S4000 C3S1-SUB SAND 0.00 73.80
S4000 C3S1-SUB STONE 0.00 94.59
S4000 C3S1-SUB SIKA 204 0.00 0.00
S4000 C3S1-SUB SIKA 3006 ES 0.00 248.40
28003-C3ML-SUB O-BASF 8320 0.00 0.00
28003-C3ML-SUB
28003-C3ML-SUB
28003-C3ML-SUB CP-07
CP-0602
CP-0602 UCY BP-01 UCY BP-02
CP-0602 CEMENT 0.00 0.00
CP-0602 SAND 0.00 0.00
STONE 0.00 0.00
SIKA 204 0.00 0.00
SIKA 3006 ES 0.00 0.00
O-BASF 8320 0.00 0.00

CP-03&04
UCY BP-01 UCY BP-02
CEMENT 2.16 65.16
SAND 3.92 130.79
STONE 4.86 161.32
SIKA 204 0.00 238.10
SIKA 3006 ES 12.97 11.87
O-BASF 8320 0.00 409.50
SIKA LATEX POWER 0.00 0.00

Check by
Plant Engineer

Check by
Engineer THAI
total
108.72 tons
208.51 tons
260.77 tons
238.10 kg
273.24 kg
409.50 kg
0.00 kg

SIKA 3006 ES

total
41.40 tons O-BASF 8320
73.80 tons
94.59 tons
0.00 kg
248.40 kg
0.00 kg

total
0.00 tons
0.00 tons
0.00 tons
0.00 kg
0.00 kg
0.00 kg
total
67.32 tons
134.71 tons
166.18 tons
238.10 kg
24.84 kg
409.50 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 13/02/2021
Summary RQ
DATE Plant RQ NO Material QTY
13/2/2021 UCY BP-01 274182 CEMENT 14.23
13/2/2021 UCY BP-01 274183 SAND 35.56
13/2/2021 UCY BP-01 274184 STONE 43.52
13/2/2021 UCY BP-01 274185 SIKA 204 196.00
13/2/2021 UCY BP-01 274186 SIKA LATEX POWER 280.00
13/2/2021 UCY BP-02 274187 CEMENT 12.48
13/2/2021 UCY BP-02 274188 SAND 31.22
13/2/2021 UCY BP-02 274189 STONE 38.08
13/2/2021 UCY BP-02 274190 SIKA 204 171.50
13/2/2021 UCY BP-02 274191 CEMENT 10.56
13/2/2021 UCY BP-02 274192 SAND 26.44
13/2/2021 UCY BP-02 274193 STONE 32.10
13/2/2021 UCY BP-02 274194 SIKA 204 144.55
13/2/2021 UCY BP-02 274195 CEMENT 1.97
13/2/2021 UCY BP-02 274196 SAND 4.46
13/2/2021 UCY BP-02 274197 STONE 4.43
13/2/2021 UCY BP-02 274198 SIKA 204 16.99
13/2/2021 UCY BP-02 274199 CEMENT 2.62
13/2/2021 UCY BP-02 274200 SAND 4.76
13/2/2021 UCY BP-02 274288 STONE 5.93
13/2/2021 UCY BP-02 274289 SIKA 204 13.80
13/2/2021 UCY BP-02 274290 SIKA 3006 ES 7.45
13/2/2021 UCY BP-02 274291 CEMENT 7.91
13/2/2021 UCY BP-02 274292 SAND 14.34
13/2/2021 UCY BP-02 274293 STONE 17.87
13/2/2021 UCY BP-02 274294 SIKA 3006 ES 47.47
13/2/2021 UCY BP-02 274295 CEMENT 2.63
13/2/2021 UCY BP-02 274296 SAND 6.52
13/2/2021 UCY BP-02 274297 STONE 7.91
13/2/2021 UCY BP-02 274298 SIKA 204 36.75
13/2/2021 UCY BP-02 274299 CEMENT 3.23
13/2/2021 UCY BP-02 274300 SAND 6.32
13/2/2021 UCY BP-02 280501 STONE 7.76
13/2/2021 UCY BP-02 280502 SIKA 204 32.30
13/2/2021 UCY BP-02 280503 CEMENT 1.05
13/2/2021 UCY BP-02 280504 SAND 2.09
13/2/2021 UCY BP-02 280505 STONE 2.59
13/2/2021 UCY BP-02 280506 SIKA 204 10.50
13/2/2021 UCY BP-01 CEMENT 23.58
13/2/2021 UCY BP-01 SAND 47.55
13/2/2021 UCY BP-01 STONE 59.97
13/2/2021 UCY BP-01 SIKA 204 259.33
13/2/2021 UCY BP-02 CEMENT 1.03
13/2/2021 UCY BP-02 SAND 2.04
13/2/2021 UCY BP-02 STONE 2.61
13/2/2021 UCY BP-02 SIKA 204 11.28
13/2/2021 UCY BP-02 CEMENT 58.93
13/2/2021 UCY BP-02 SAND 105.74
13/2/2021 UCY BP-02 STONE 135.75
13/2/2021 UCY BP-02 SIKA 3006 ES 349.51

Record BY
Operator
21
SUBJOB RECORDER
31002 C3S2-ARC CEMENT 140.22 tons
31002 C3S2-ARC SAND 287.04 tons
31002 C3S2-ARC STONE 358.52 tons
31002 C3S2-ARC SIKA 204 893.00 kg
31002 C3S2-ARC SIKA 3006 ES 404.43 kg
33003 C3S4-ARC O-BASF 8320 0.00 kg
33003 C3S4-ARC SIKA LATEX POWER 280.00 kg
33003 C3S4-ARC
33003 C3S4-ARC UCY BP-01 UCY BP-02
33003 C3S1 ARC CEMENT 37.81 102.41
33003 C3S1 ARC SAND 83.11 203.93
33003 C3S1 ARC STONE 103.49 255.03
33003 C3S1 ARC SIKA 204 455.33 437.67
S4000 C3S2-SUB SIKA 3006 ES 0.00 404.43
S4000 C3S2-SUB O-BASF 8320 0.00 0.00
S4000 C3S2-SUB SIKA LATEX POWER 280.00 0.00
S4000 C3S2-SUB
28001 SP-A-SUP CP-0602
28001 SP-A-SUP
28001 SP-A-SUP UCY BP-01 UCY BP-02
28001 SP-A-SUP CEMENT 0.00 58.93
28001 SP-A-SUP SAND 0.00 105.74
20103 TRAFFICM STONE 0.00 135.75
20103 TRAFFICM SIKA 204 0.00 0.00
20103 TRAFFICM SIKA 3006 ES 0.00 349.51
20103 TRAFFICM O-BASF 8320 0.00 0.00
33002 C3S1 ARC
33002 C3S1 ARC
33002 C3S1 ARC CP-07
33002 C3S1 ARC
28003 C3ML-SUB UCY BP-01 UCY BP-02
28003 C3ML-SUB CEMENT 23.58 1.03
28003 C3ML-SUB SAND 47.55 2.04
28003 C3ML-SUB STONE 59.97 2.61
33003 C3S3-ARC SIKA 204 259.33 11.28
33003 C3S3-ARC SIKA 3006 ES 0.00 0.00
33003 C3S3-ARC O-BASF 8320 0.00 0.00
33003 C3S3-ARC
CP-07
CP-07 CP-03&04
CP-07
CP-07 UCY BP-01 UCY BP-02
CP-07 CEMENT 14.23 42.45
CP-07 SAND 35.56 96.15
CP-07 STONE 43.52 116.67
CP-07 SIKA 204 196.00 426.39
CP-0602 SIKA 3006 ES 0.00 54.92
CP-0602 O-BASF 8320 0.00 0.00
CP-0602 SIKA LATEX POWER 280.00 0.00
CP-0602

Check by
Plant Engineer

Check by
Engineer THAI
total
140.22 tons
287.04 tons
358.52 tons
893.00 kg
404.43 kg
0.00 kg
280.00 kg

SIKA 3006 ES

total
58.93 tons O-BASF 8320
105.74 tons
135.75 tons
0.00 kg
349.51 kg
0.00 kg

total
24.61 tons
49.59 tons
62.58 tons
270.61 kg
0.00 kg
0.00 kg
total
56.68 tons
131.71 tons
160.19 tons
622.39 kg
54.92 kg
0.00 kg
280.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 14/02/2021
Summary RQ
DATE Plant RQ NO Material QTY
14/2/2021 UCY BP-01 280507 CEMENT 15.85
14/2/2021 UCY BP-01 280508 SAND 39.79
14/2/2021 UCY BP-01 280509 STONE 47.78
14/2/2021 UCY BP-01 280510 SIKA 204 215.60
14/2/2021 UCY BP-01 280511 SIKA LATEX POWER 308.00
14/2/2021 UCY BP-01 280512 CEMENT 1.72
14/2/2021 UCY BP-01 280513 SAND 3.69
14/2/2021 UCY BP-01 280514 STONE 4.41
14/2/2021 UCY BP-01 280515 SIKA 204 15.50
14/2/2021 UCY BP-01 280516 CEMENT 2.30
14/2/2021 UCY BP-01 280517 SAND 4.19
14/2/2021 UCY BP-01 280518 STONE 5.19
14/2/2021 UCY BP-01 280519 O-BASF 8320 23.00
14/2/2021 UCY BP-02 280520 CEMENT 1.01
14/2/2021 UCY BP-02 280521 SAND 1.81
14/2/2021 UCY BP-02 280522 STONE 2.30
14/2/2021 UCY BP-02 280523 SIKA 3006 ES 6.07
14/2/2021 UCY BP-02 280524 CEMENT 1.06
14/2/2021 UCY BP-02 280525 SAND 1.90
14/2/2021 UCY BP-02 280526 STONE 2.42
14/2/2021 UCY BP-02 280527 SIKA 3006 ES 6.35
14/2/2021 UCY BP-02 280528 CEMENT 8.65
14/2/2021 UCY BP-02 280529 SAND 17.58
14/2/2021 UCY BP-02 280530 STONE 20.66
14/2/2021 UCY BP-02 280531 SIKA 204 85.50
14/2/2021 UCY BP-02 280532 CEMENT 1.75
14/2/2021 UCY BP-02 280533 SAND 3.18
14/2/2021 UCY BP-02 280534 STONE 3.94
14/2/2021 UCY BP-02 280535 SIKA 204 17.48
14/2/2021 UCY BP-02 280536 CEMENT 2.76
14/2/2021 UCY BP-02 280537 SAND 5.03
14/2/2021 UCY BP-02 280538 STONE 6.22
14/2/2021 UCY BP-02 280539 SIKA 204 27.60
14/2/2021 UCY BP-01 - CEMENT 41.62
14/2/2021 UCY BP-01 - SAND 84.14
14/2/2021 UCY BP-01 - STONE 105.56
14/2/2021 UCY BP-01 - SIKA 204 457.77
14/2/2021 UCY BP-02 - CEMENT 4.72
14/2/2021 UCY BP-02 - SAND 9.44
14/2/2021 UCY BP-02 - STONE 11.91
14/2/2021 UCY BP-02 - SIKA 204 51.87
14/2/2021 UCY BP-02 - CEMENT 57.98
14/2/2021 UCY BP-02 - SAND 104.82
14/2/2021 UCY BP-02 - STONE 133.38
14/2/2021 UCY BP-02 - SIKA 3006 ES 343.02

Record BY
Operator
21
SUBJOB RECORDER
31002-C3S3-ARC CEMENT 139.42 tons
31002-C3S3-ARC SAND 275.57 tons
31002-C3S3-ARC STONE 343.77 tons
31002-C3S3-ARC SIKA 204 871.32 kg
31002-C3S3-ARC SIKA 3006 ES 355.44 kg
28003-C3ML-SUB O-BASF 8320 23.00 kg
28003-C3ML-SUB SIKA LATEX POWER 308.00 kg
28003-C3ML-SUB
28003-C3ML-SUB UCY BP-01 UCY BP-02
S4000-C4S6-SUB CEMENT 61.49 77.93
S4000-C4S6-SUB SAND 131.81 143.76
S4000-C4S6-SUB STONE 162.94 180.83
S4000-C4S6-SUB SIKA 204 688.87 182.45
28001-SP-A-SUP SIKA 3006 ES 0.00 355.44
28001-SP-A-SUP O-BASF 8320 23.00 0.00
28001-SP-A-SUP SIKA LATEX POWER 308.00 0.00
28001-SP-A-SUP
20103 TRAFFICM CP-0602
20103 TRAFFICM
20103 TRAFFICM UCY BP-01 UCY BP-02
20103 TRAFFICM CEMENT 0.00 57.98
S4000-C3S1-SUB SAND 0.00 104.82
S4000-C3S1-SUB STONE 0.00 133.38
S4000-C3S1-SUB SIKA 204 0.00 0.00
S4000-C3S1-SUB SIKA 3006 ES 0.00 343.02
26102-C4ML-SUB O-BASF 8320 0.00 0.00
26102-C4ML-SUB
26102-C4ML-SUB
26102-C4ML-SUB CP-07
S4000-C4S6-SUB
S4000-C4S6-SUB UCY BP-01 UCY BP-02
S4000-C4S6-SUB CEMENT 41.62 4.72
S4000-C4S6-SUB SAND 84.14 9.44
CP-07 STONE 105.56 11.91
CP-07 SIKA 204 457.77 51.87
CP-07 SIKA 3006 ES 0.00 0.00
CP-07 O-BASF 8320 0.00 0.00
CP-07
CP-07
CP-07 CP-03&04
CP-07
CP-0602 UCY BP-01 UCY BP-02
CP-0602 CEMENT 19.87 15.23
CP-0602 SAND 47.67 29.50
CP-0602 STONE 57.38 35.54
SIKA 204 231.10 130.58
SIKA 3006 ES 0.00 12.42
O-BASF 8320 23.00 0.00
SIKA LATEX POWER 308.00 0.00

Check by
Plant Engineer

Check by
Engineer THAI
total
139.42 tons
275.57 tons
343.77 tons
871.32 kg
355.44 kg
23.00 kg
308.00 kg

SIKA 3006 ES

total
57.98 tons O-BASF 8320
104.82 tons
133.38 tons
0.00 kg
343.02 kg
0.00 kg

total
46.34 tons
93.58 tons
117.47 tons
509.64 kg
0.00 kg
0.00 kg
total
35.10 tons
77.17 tons
92.92 tons
361.68 kg
12.42 kg
23.00 kg
308.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 15/02/2021
Summary RQ
DATE Plant RQ NO Material QTY
15/2/2021 UCY BP-01 280540 CEMENT 11.07
15/2/2021 UCY BP-01 280541 SAND 27.77
15/2/2021 UCY BP-01 280542 STONE 33.76
15/2/2021 UCY BP-01 280543 SIKA 204 151.90
15/2/2021 UCY BP-01 280544 SIKA LATEX POWER 217.00
15/2/2021 UCY BP-01 280545 CEMENT 57.62
15/2/2021 UCY BP-01 280546 SAND 115.53
15/2/2021 UCY BP-01 280547 STONE 141.30
15/2/2021 UCY BP-01 280548 O-BASF 8320 574.20
15/2/2021 UCY BP-02 280549 CEMENT 8.48
15/2/2021 UCY BP-02 280550 SAND 17.48
15/2/2021 UCY BP-02 280551 STONE 19.74
15/2/2021 UCY BP-02 280552 O-BASF 8320 82.80
15/2/2021 UCY BP-02 280553 CEMENT 1.72
15/2/2021 UCY BP-02 280554 SAND 3.70
15/2/2021 UCY BP-02 280555 STONE 4.41
15/2/2021 UCY BP-02 280556 O-BASF 8320 15.50
15/2/2021 UCY BP-02 280557 CEMENT 1.06
15/2/2021 UCY BP-02 280558 SAND 1.93
15/2/2021 UCY BP-02 280559 STONE 2.38
15/2/2021 UCY BP-02 280560 SIKA 3006 ES 6.35
15/2/2021 UCY BP-02 280561 CEMENT 2.27
15/2/2021 UCY BP-02 280562 SAND 4.28
15/2/2021 UCY BP-02 280563 STONE 5.29
15/2/2021 UCY BP-02 280564 O-BASF 8320 8.40
15/2/2021 UCY BP-02 280565 SIKA 3006 ES 8.56
15/2/2021 UCY BP-02 280566 CEMENT 0.69
15/2/2021 UCY BP-02 280567 SAND 1.26
15/2/2021 UCY BP-02 280568 STONE 1.55
15/2/2021 UCY BP-02 280569 O-BASF 8320 6.90
15/2/2021 UCY BP-02 280570 CEMENT 16.38
15/2/2021 UCY BP-02 280571 SAND 32.68
15/2/2021 UCY BP-02 280572 STONE 40.52
15/2/2021 UCY BP-02 280573 O-BASF 8320 163.80
15/2/2021 UCY BP-02 CEMENT 36.70
15/2/2021 UCY BP-02 SAND 73.48
15/2/2021 UCY BP-02 STONE 93.89
15/2/2021 UCY BP-02 O-BASF 8320 102.86
15/2/2021 UCY BP-02 SIKA 204 300.79
15/2/2021 UCY BP-01 CEMENT 41.40
15/2/2021 UCY BP-01 SAND 73.98
15/2/2021 UCY BP-01 STONE 94.50
15/2/2021 UCY BP-01 O-BASF 8320 248.40
15/2/2021 UCY BP-02 CEMENT 17.65
15/2/2021 UCY BP-02 SAND 32.47
15/2/2021 UCY BP-02 STONE 41.30
15/2/2021 UCY BP-02 SIKA 3006 ES 101.16

Record BY
Operator
21
SUBJOB RECORDER
33003-C3S3-ARC CEMENT 195.04 tons
33003-C3S3-ARC SAND 384.56 tons
33003-C3S3-ARC STONE 478.64 tons
33003-C3S3-ARC SIKA 204 452.69 kg
33003-C3S3-ARC SIKA 3006 ES 116.07 kg
S4000-C3S4-SUB O-BASF 8320 1202.86 kg
S4000-C3S4-SUB SIKA LATEX POWER 217.00 kg
S4000-C3S4-SUB
S4000-C3S4-SUB UCY BP-01 UCY BP-02
S4000-C3S2-SUB CEMENT 110.09 84.95
S4000-C3S2-SUB SAND 217.28 167.28
S4000-C3S2-SUB STONE 269.56 209.08
S4000-C3S2-SUB SIKA 204 151.90 300.79
28003-C3ML-SUB SIKA 3006 ES 0.00 116.07
28003-C3ML-SUB O-BASF 8320 822.60 380.26
28003-C3ML-SUB SIKA LATEX POWER 217.00 0.00
28003-C3ML-SUB
20103 TRAFFICM CP-0602
20103 TRAFFICM
20103 TRAFFICM UCY BP-01 UCY BP-02
20103 TRAFFICM CEMENT 41.40 17.65
28001 SP-A-SUP SAND 73.98 32.47
28001 SP-A-SUP STONE 94.50 41.30
28001 SP-A-SUP SIKA 204 0.00 0.00
28001 SP-A-SUP SIKA 3006 ES 0.00 101.16
28001 SP-A-SUP O-BASF 8320 248.40 0.00
S4000-C3S1-SUB
S4000-C3S1-SUB
S4000-C3S1-SUB CP-07
S4000-C3S1-SUB
S4000-C3S4-SUB UCY BP-01 UCY BP-02
S4000-C3S4-SUB CEMENT 0.00 36.70
S4000-C3S4-SUB SAND 0.00 73.48
S4000-C3S4-SUB STONE 0.00 93.89
CP-07 SIKA 204 0.00 300.79
CP-07 SIKA 3006 ES 0.00 0.00
CP-07 O-BASF 8320 0.00 102.86
CP-07
CP-07
CP-0602 CP-03&04
CP-0602
CP-0602 UCY BP-01 UCY BP-02
CP-0602 CEMENT 68.69 30.60
CP-0602 SAND 143.30 61.33
CP-0602 STONE 175.06 73.89
CP-0602 SIKA 204 151.90 0.00
CP-0602 SIKA 3006 ES 0.00 14.91
O-BASF 8320 574.20 277.40
SIKA LATEX POWER 217.00 0.00

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 168.50 72.1 240.60
CP-07 0 89.50 89.50
CP-0602 90 39.4 129.40

total
195.04 tons
384.56 tons
478.64 tons
452.69 kg
116.07 kg
1202.86 kg
217.00 kg

total
59.05 tons
106.45 tons
135.80 tons
0.00 kg
101.16 kg
248.40 kg

total
36.70 tons
73.48 tons
93.89 tons
300.79 kg
0.00 kg
102.86 kg
total
99.29 tons
204.63 tons
248.95 tons
151.90 kg
14.91 kg
851.60 kg
217.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 16/02/2021
Summary RQ
DATE Plant RQ NO Material QTY
16/2/2021 UCY BP-01 280574 CEMENT 20.31
16/2/2021 UCY BP-01 280575 SAND 50.33
16/2/2021 UCY BP-01 280576 STONE 60.74
16/2/2021 UCY BP-01 280577 O-BASF 8320 14.70
16/2/2021 UCY BP-01 280578 SIKA 204 257.25
16/2/2021 UCY BP-01 280579 CEMENT 1.26
16/2/2021 UCY BP-01 280580 SAND 2.53
16/2/2021 UCY BP-01 280581 STONE 3.11
16/2/2021 UCY BP-01 280582 O-BASF 8320 12.60
16/2/2021 UCY BP-01 280583 CEMENT 1.05
16/2/2021 UCY BP-01 280584 SAND 2.11
16/2/2021 UCY BP-01 280585 STONE 2.59
16/2/2021 UCY BP-01 280586 O-BASF 8320 10.50
16/2/2021 UCY BP-01 280587 CEMENT 2.73
16/2/2021 UCY BP-01 280588 SAND 5.48
16/2/2021 UCY BP-01 280589 STONE 6.73
16/2/2021 UCY BP-01 280590 O-BASF 8320 27.30
16/2/2021 UCY BP-01 280591 CEMENT 1.38
16/2/2021 UCY BP-01 280592 SAND 2.52
16/2/2021 UCY BP-01 280593 STONE 3.11
16/2/2021 UCY BP-01 280594 O-BASF 8320 13.80
16/2/2021 UCY BP-01 280595 CEMENT 1.43
16/2/2021 UCY BP-01 280596 SAND 2.60
16/2/2021 UCY BP-01 280597 STONE 3.21
16/2/2021 UCY BP-01 280598 SIKA 3006 ES 8.56
16/2/2021 UCY BP-01 280599 CEMENT 1.15
16/2/2021 UCY BP-01 280600 SAND 2.10
16/2/2021 UCY BP-01 280801 STONE 2.59
16/2/2021 UCY BP-01 280802 SIKA 3006 ES 6.90
16/2/2021 UCY BP-02 280803 CEMENT 8.23
16/2/2021 UCY BP-02 280804 SAND 16.82
16/2/2021 UCY BP-02 280805 STONE 19.70
16/2/2021 UCY BP-02 280806 O-BASF 8320 81.30
16/2/2021 UCY BP-02 280807 CEMENT 1.72
16/2/2021 UCY BP-02 280808 SAND 3.70
16/2/2021 UCY BP-02 280809 STONE 4.42
16/2/2021 UCY BP-02 280810 O-BASF 8320 15.50
16/2/2021 UCY BP-01 CEMENT 29.11
16/2/2021 UCY BP-01 SAND 58.72
16/2/2021 UCY BP-01 STONE 73.98
16/2/2021 UCY BP-01 SIKA 204 320.21
16/2/2021 UCY BP-02 CEMENT 11.89
16/2/2021 UCY BP-02 SAND 24.01
16/2/2021 UCY BP-02 STONE 30.25
16/2/2021 UCY BP-02 SIKA 204 130.79
16/2/2021 UCY BP-01 CEMENT 57.04
16/2/2021 UCY BP-01 SAND 102.42
16/2/2021 UCY BP-01 STONE 129.95
16/2/2021 UCY BP-01 SIKA 3006 ES 342.24

Record BY
Operator
21
SUBJOB RECORDER
33003 C3S1-ARC CEMENT 137.30 tons
33003 C3S1-ARC SAND 273.34 tons
33003 C3S1-ARC STONE 340.38 tons
33003 C3S1-ARC SIKA 204 708.25 kg
33003 C3S1-ARC SIKA 3006 ES 357.70 kg
33003 C3S2-ARC O-BASF 8320 175.70 kg
33003 C3S2-ARC SIKA LATEX POWER 0.00 kg
33003 C3S2-ARC
33003 C3S2-ARC UCY BP-01 UCY BP-02
S4000-C3S1-SUB CEMENT 115.46 21.84
S4000-C3S1-SUB SAND 228.81 44.53
S4000-C3S1-SUB STONE 286.01 54.37
S4000-C3S1-SUB SIKA 204 577.46 130.79
28003-C4ML-SUB SIKA 3006 ES 357.70 0.00
28003-C4ML-SUB O-BASF 8320 78.90 96.80
28003-C4ML-SUB SIKA LATEX POWER 0.00 0.00
28003-C4ML-SUB
S4000-C3S2-SUB CP-0602
S4000-C3S2-SUB
S4000-C3S2-SUB UCY BP-01 UCY BP-02
S4000-C3S2-SUB CEMENT 57.04 0.00
28001 SP-A-SUP SAND 102.42 0.00
28001 SP-A-SUP STONE 129.95 0.00
28001 SP-A-SUP SIKA 204 0.00 0.00
28001 SP-A-SUP SIKA 3006 ES 342.24 0.00
20103 TRAFFICM O-BASF 8320 0.00 0.00
20103 TRAFFICM
20103 TRAFFICM
20103 TRAFFICM CP-07
S4000 C3S2-SUB
S4000 C3S2-SUB UCY BP-01 UCY BP-02
S4000 C3S2-SUB CEMENT 29.11 11.89
S4000 C3S2-SUB SAND 58.72 24.01
28003 C3ML-SUB STONE 73.98 30.25
28003 C3ML-SUB SIKA 204 320.21 130.79
28003 C3ML-SUB SIKA 3006 ES 0.00 0.00
28003 C3ML-SUB O-BASF 8320 0.00 0.00
CP-07
CP-07
CP-07 CP-03&04
CP-07
CP-07 UCY BP-01 UCY BP-02
CP-07 CEMENT 29.31 9.95
CP-07 SAND 67.67 20.52
CP-07 STONE 82.08 24.12
CP-0602 SIKA 204 257.25 0.00
CP-0602 SIKA 3006 ES 15.46 0.00
CP-0602 O-BASF 8320 78.90 96.80
CP-0602 SIKA LATEX POWER 0.00 0.00

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 77.60 23.7 101.30
CP-07 71 29.00 100.00
CP-0602 125 0 125.00

total
137.30 tons
273.34 tons
340.38 tons
708.25 kg
357.70 kg
175.70 kg
0.00 kg

total
57.04 tons
102.42 tons
129.95 tons
0.00 kg
342.24 kg
0.00 kg

total
41.00 tons
82.73 tons
104.23 tons
451.00 kg
0.00 kg
0.00 kg
total
39.26 tons
88.19 tons
106.20 tons
257.25 kg
15.46 kg
175.70 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 17/02/2021
Summary RQ
DATE Plant RQ NO Material QTY
17/2/2021 UCY BP-01 280811 CEMENT 1.72
17/2/2021 UCY BP-01 280812 SAND 3.71
17/2/2021 UCY BP-01 280813 STONE 4.40
17/2/2021 UCY BP-01 280814 SIKA 204 15.50
17/2/2021 UCY BP-01 280815 CEMENT 1.24
17/2/2021 UCY BP-01 280816 SAND 2.27
17/2/2021 UCY BP-01 280817 STONE 2.78
17/2/2021 UCY BP-01 280818 SIKA 3006 ES 7.45
17/2/2021 UCY BP-01 280819 CEMENT 1.15
17/2/2021 UCY BP-01 280820 SAND 2.10
17/2/2021 UCY BP-01 280821 STONE 2.58
17/2/2021 UCY BP-01 280822 SIKA 3006 ES 6.90
17/2/2021 UCY BP-01 - CEMENT 0.62
17/2/2021 UCY BP-01 - SAND 1.25
17/2/2021 UCY BP-01 - STONE 1.57
17/2/2021 UCY BP-01 - SIKA 204 6.77
17/2/2021 UCY BP-02 - CEMENT 28.50
17/2/2021 UCY BP-02 - SAND 57.48
17/2/2021 UCY BP-02 - STONE 72.21
17/2/2021 UCY BP-02 - SIKA 204 313.45
17/2/2021 UCY BP-01 - CEMENT 48.10
17/2/2021 UCY BP-01 - SAND 87.61
17/2/2021 UCY BP-01 - STONE 112.06
17/2/2021 UCY BP-01 - SIKA 3006 ES 279.24
Record BY
Operator
21
SUBJOB RECORDER
24000 C3ML-SUB CEMENT 81.33 tons
24000 C3ML-SUB SAND 154.42 tons
24000 C3ML-SUB STONE 195.60 tons
24000 C3ML-SUB SIKA 204 335.72 kg
28001 SP-A-SUP SIKA 3006 ES 293.59 kg
28001 SP-A-SUP O-BASF 8320 0.00 kg
28001 SP-A-SUP SIKA LATEX POWER 0.00 kg
28001 SP-A-SUP
20103 TRAFFICEM UCY BP-01 UCY BP-02
20103 TRAFFICEM CEMENT 52.83 28.50
20103 TRAFFICEM SAND 96.94 57.48
20103 TRAFFICEM STONE 123.39 72.21
CP-07 SIKA 204 22.27 313.45
CP-07 SIKA 3006 ES 293.59 0.00
CP-07 O-BASF 8320 0.00 0.00
CP-07 SIKA LATEX POWER 0.00 0.00
CP-07
CP-07 CP-0602
CP-07
CP-07 UCY BP-01 UCY BP-02
CP-0602 CEMENT 48.10 0.00
CP-0602 SAND 87.61 0.00
CP-0602 STONE 112.06 0.00
CP-0602 SIKA 204 0.00 0.00
SIKA 3006 ES 279.24 0.00
O-BASF 8320 0.00 0.00

CP-07

UCY BP-01 UCY BP-02


CEMENT 0.62 28.50
SAND 1.25 57.48
STONE 1.57 72.21
SIKA 204 6.77 313.45
SIKA 3006 ES 0.00 0.00
O-BASF 8320 0.00 0.00

CP-03&04
UCY BP-01 UCY BP-02
CEMENT 4.11 0.00
SAND 8.08 0.00
STONE 9.76 0.00
SIKA 204 15.50 0.00
SIKA 3006 ES 14.35 0.00
O-BASF 8320 0.00 0.00
SIKA LATEX POWER 0.00 0.00

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 9.40 0 9.40
CP-07 1.5 69.50 71.00
CP-0602 106.6 0 106.60

total
81.33 tons
154.42 tons
195.60 tons
335.72 kg
293.59 kg
0.00 kg
0.00 kg

total
48.10 tons
87.61 tons
112.06 tons
0.00 kg
279.24 kg
0.00 kg

total
29.12 tons
58.73 tons
73.78 tons
320.22 kg
0.00 kg
0.00 kg
total
4.11 tons
8.08 tons
9.76 tons
15.50 kg
14.35 kg
0.00 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 18/02/2021
Summary RQ
DATE Plant RQ NO Material QTY
18/2/2021 UCY BP-01 280823 CEMENT 0.25
18/2/2021 UCY BP-01 280824 SAND 0.78
18/2/2021 UCY BP-01 280825 O-BASF 8320 1.50
18/2/2021 UCY BP-01 280826 CEMENT 2.41
18/2/2021 UCY BP-01 280827 SAND 4.95
18/2/2021 UCY BP-01 280828 STONE 5.96
18/2/2021 UCY BP-01 280829 O-BASF 8320 22.40
18/2/2021 UCY BP-01 280830 CEMENT 0.63
18/2/2021 UCY BP-01 280831 SAND 1.26
18/2/2021 UCY BP-01 280832 STONE 1.55
18/2/2021 UCY BP-01 280833 O-BASF 8320 6.30
18/2/2021 UCY BP-01 280834 CEMENT 10.91
18/2/2021 UCY BP-01 280835 SAND 27.37
18/2/2021 UCY BP-01 280836 STONE 33.14
18/2/2021 UCY BP-01 280837 SIKA 204 149.45
18/2/2021 UCY BP-01 280838 CEMENT 42.23
18/2/2021 UCY BP-01 280839 SAND 85.00
18/2/2021 UCY BP-01 280840 STONE 103.40
18/2/2021 UCY BP-01 280841 O-BASF 8320 420.00
18/2/2021 UCY BP-02 280842 CEMENT 12.83
18/2/2021 UCY BP-02 280843 SAND 32.16
18/2/2021 UCY BP-02 280844 STONE 39.17
18/2/2021 UCY BP-02 280845 SIKA 204 176.40
18/2/2021 UCY BP-02 280846 CEMENT 1.61
18/2/2021 UCY BP-02 280847 SAND 2.93
18/2/2021 UCY BP-02 280848 STONE 3.62
18/2/2021 UCY BP-02 280849 SIKA 204 16.10
18/2/2021 UCY BP-02 280850 CEMENT 1.50
18/2/2021 UCY BP-02 280851 SAND 6.17
18/2/2021 UCY BP-02 280852 STONE 6.82
18/2/2021 UCY BP-02 280853 SIKA 204 14.95
18/2/2021 UCY BP-02 280854 CEMENT 1.24
18/2/2021 UCY BP-02 280855 SAND 2.26
18/2/2021 UCY BP-02 280856 STONE 2.79
18/2/2021 UCY BP-02 280857 SIKA 3006 ES 7.45
18/2/2021 UCY BP-02 280858 CEMENT 1.15
18/2/2021 UCY BP-02 280859 SAND 2.10
18/2/2021 UCY BP-02 280860 STONE 2.59
18/2/2021 UCY BP-02 280861 SIKA 3006 ES 6.90
18/2/2021 UCY BP-02 280862 CEMENT 27.30
18/2/2021 UCY BP-02 280863 SAND 54.73
18/2/2021 UCY BP-02 280864 STONE 67.21
18/2/2021 UCY BP-02 280865 O-BASF 8320 273.00
18/2/2021 UCY BP-01 - CEMENT 27.27
18/2/2021 UCY BP-01 - SAND 54.93
18/2/2021 UCY BP-01 - STONE 69.09
18/2/2021 UCY BP-01 - O-BASF 8320 299.92
18/2/2021 UCY BP-02 - CEMENT 16.84
18/2/2021 UCY BP-02 - SAND 31.46
18/2/2022 UCY BP-02 - STONE 40.10
18/2/2023 UCY BP-02 - SIKA 3006 ES 98.72

Record BY
Operator
21
SUBJOB RECORDER
S4000-S3S2-SUB CEMENT 146.17 tons
S4000-S3S2-SUB SAND 306.10 tons
S4000-S3S2-SUB STONE 375.44 tons
24000-C3ML-SUB SIKA 204 356.90 kg
24000-C3ML-SUB SIKA 3006 ES 113.07 kg
24000-C3ML-SUB O-BASF 8320 1023.12 kg
24000-C3ML-SUB SIKA LATEX POWER 0.00 kg
33003-C3S4-ARC
33003-C3S4-ARC UCY BP-01 UCY BP-02
33003-C3S4-ARC CEMENT 83.70 62.47
33003-C3S4-ARC SAND 174.29 131.81
33003-C3S2-ARC STONE 213.14 162.30
33003-C3S2-ARC SIKA 204 149.45 207.45
33003-C3S2-ARC SIKA 3006 ES 0.00 113.07
33003-C3S2-ARC O-BASF 8320 750.12 273.00
S4000-C3S4-SUB SIKA LATEX POWER 0.00 0.00
S4000-C3S4-SUB
S4000-C3S4-SUB CP-0602
S4000-C3S4-SUB
31002-C3S1-ARC UCY BP-01 UCY BP-02
31002-C3S1-ARC CEMENT 0.00 16.84
31002-C3S1-ARC SAND 0.00 31.46
31002-C3S1-ARC STONE 0.00 40.10
28006-C3ML-SUB SIKA 204 0.00 0.00
28006-C3ML-SUB SIKA 3006 ES 0.00 98.72
28006-C3ML-SUB O-BASF 8320 0.00 0.00
28006-C3ML-SUB
S4000-C3S2-SUB
S4000-C3S2-SUB CP-07
S4000-C3S2-SUB
S4000-C3S2-SUB UCY BP-01 UCY BP-02
28001 SP-A-SUP CEMENT 27.27 0.00
28001 SP-A-SUP SAND 54.93 0.00
28001 SP-A-SUP STONE 69.09 0.00
28001 SP-A-SUP SIKA 204 0.00 0.00
20103-TRAFFICM SIKA 3006 ES 0.00 0.00
20103-TRAFFICM O-BASF 8320 299.92 0.00
20103-TRAFFICM
20103-TRAFFICM
S4000-C3S4-SUB CP-03&04
S4000-C3S4-SUB
S4000-C3S4-SUB UCY BP-01 UCY BP-02
S4000-C3S4-SUB CEMENT 56.43 45.63
CP-07 SAND 119.36 100.35
CP-07 STONE 144.05 122.20
CP-07 SIKA 204 149.45 207.45
CP-07 SIKA 3006 ES 0.00 14.35
CP-0602 O-BASF 8320 450.20 273.00
CP-0602 SIKA LATEX POWER 0.00 0.00
CP-0602
CP-0602

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 139.20 116.7 255.90
CP-07 66.5 0.00 66.50
CP-0602 0 38.2 38.20

total
146.17 tons
306.10 tons
375.44 tons
356.90 kg
113.07 kg
1023.12 kg
0.00 kg

total
16.84 tons
31.46 tons
40.10 tons
0.00 kg
98.72 kg
0.00 kg

total
27.27 tons
54.93 tons
69.09 tons
0.00 kg
0.00 kg
299.92 kg
total
102.06 tons
219.71 tons
266.25 tons
356.90 kg
14.35 kg
723.20 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 19/02/2021
Summary RQ
DATE Plant RQ NO Material QTY
19/2/2021 UCY BP-02 280866 CEMENT 1.38
19/2/2021 UCY BP-02 280867 SAND 2.52
19/2/2021 UCY BP-02 280868 STONE 3.11
19/2/2021 UCY BP-02 280869 SIKA 3006 ES 8.28
19/2/2021 UCY BP-02 - CEMENT 18.04
19/2/2021 UCY BP-02 - SAND 36.34
19/2/2021 UCY BP-02 - STONE 45.76
19/2/2021 UCY BP-02 - SIKA 204 198.44
Record BY
Operator
21
SUBJOB RECORDER
20103 TRAFFICM CEMENT 19.42 tons
20103 TRAFFICM SAND 38.86 tons
20103 TRAFFICM STONE 48.87 tons
20103 TRAFFICM SIKA 204 198.44 kg
CP-07 SIKA 3006 ES 8.28 kg
CP-07 O-BASF 8320 0.00 kg
CP-07 SIKA LATEX POWER 0.00 kg
CP-07
UCY BP-01 UCY BP-02
CEMENT 0.00 19.42
SAND 0.00 38.86
STONE 0.00 48.87
SIKA 204 0.00 198.44
SIKA 3006 ES 0.00 8.28
O-BASF 8320 0.00 0.00
SIKA LATEX POWER 0.00 0.00

CP-0602

UCY BP-01 UCY BP-02


CEMENT 0.00 0.00
SAND 0.00 0.00
STONE 0.00 0.00
SIKA 204 0.00 0.00
SIKA 3006 ES 0.00 0.00
O-BASF 8320 0.00 0.00

CP-07

UCY BP-01 UCY BP-02


CEMENT 0.00 18.04
SAND 0.00 36.34
STONE 0.00 45.76
SIKA 204 0.00 198.44
SIKA 3006 ES 0.00 0.00
O-BASF 8320 0.00 0.00

CP-03&04
UCY BP-01 UCY BP-02
CEMENT 0.00 1.38
SAND 0.00 2.52
STONE 0.00 3.11
SIKA 204 0.00 0.00
SIKA 3006 ES 0.00 8.28
O-BASF 8320 0.00 0.00
SIKA LATEX POWER 0.00 0.00

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 0.00 3 3.00
CP-07 0 44.00 44.00
CP-0602 0 24.5 24.50

total
19.42 tons
38.86 tons
48.87 tons
198.44 kg
8.28 kg
0.00 kg
0.00 kg

total
0.00 tons
0.00 tons
0.00 tons
0.00 kg
0.00 kg
0.00 kg

total
18.04 tons
36.34 tons
45.76 tons
198.44 kg
0.00 kg
0.00 kg
total
1.38 tons
2.52 tons
3.11 tons
0.00 kg
8.28 kg
0.00 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 20/02/2021
Summary RQ
DATE Plant RQ NO Material QTY
20/2/2021 UCY BP-01 280870 CEMENT 1.47
20/2/2021 UCY BP-01 280871 SAND 2.95
20/2/2021 UCY BP-01 280872 STONE 3.62
20/2/2021 UCY BP-01 280873 O-BASF 8320 14.70
20/2/2021 UCY BP-02 280874 CEMENT 2.30
20/2/2021 UCY BP-02 280875 SAND 4.57
20/2/2021 UCY BP-02 280876 STONE 4.66
20/2/2021 UCY BP-02 280877 O-BASF 8320 20.70
20/2/2021 UCY BP-02 280878 CEMENT 1.38
20/2/2021 UCY BP-02 280879 SAND 2.52
20/2/2021 UCY BP-02 280880 STONE 3.11
20/2/2021 UCY BP-02 280881 SIKA 3006 ES 8.28
20/2/2021 UCY BP-02 280882 CEMENT 0.35
20/2/2021 UCY BP-02 280883 SAND 1.43
20/2/2021 UCY BP-02 280884 STONE 1.58
20/2/2021 UCY BP-02 280885 O-BASF 8320 3.45
20/2/2021 UCY BP-02 280886 CEMENT 1.38
20/2/2021 UCY BP-02 280887 SAND 2.52
20/2/2021 UCY BP-02 280888 STONE 3.10
20/2/2021 UCY BP-02 280889 O-BASF 8320 13.80
20/2/2021 UCY BP-01 - CEMENT 49.20
20/2/2021 UCY BP-01 - SAND 100.32
20/2/2021 UCY BP-01 - STONE 125.40
20/2/2021 UCY BP-01 - SIKA 204 541.20
20/2/2021 UCY BP-02 - CEMENT 9.43
20/2/2021 UCY BP-02 - SAND 16.89
20/2/2021 UCY BP-02 - STONE 21.53
20/2/2021 UCY BP-02 - SIKA 3006 ES 56.58
Record BY
Operator
21
SUBJOB RECORDER
33003 C3S2-ARC CEMENT 65.51 tons
33003 C3S2-ARC SAND 131.20 tons
33003 C3S2-ARC STONE 163.00 tons
33003 C3S2-ARC SIKA 204 541.20 kg
S4000-C4S5-SUB SIKA 3006 ES 64.86 kg
S4000-C4S5-SUB O-BASF 8320 52.65 kg
S4000-C4S5-SUB SIKA LATEX POWER 0.00 kg
S4000-C4S5-SUB
20103-TRAFFICM UCY BP-01 UCY BP-02
20103-TRAFFICM CEMENT 50.67 14.84
20103-TRAFFICM SAND 103.27 27.93
20103-TRAFFICM STONE 129.02 33.98
20106 SIKA 204 541.20 0.00
20106 SIKA 3006 ES 0.00 64.86
20106 O-BASF 8320 14.70 37.95
20106 SIKA LATEX POWER 0.00 0.00
26102-C3ML-SUB
26102-C3ML-SUB CP-0602
26102-C3ML-SUB
26102-C3ML-SUB UCY BP-01 UCY BP-02
CP-07 CEMENT 0.00 9.43
CP-07 SAND 0.00 16.89
CP-07 STONE 0.00 21.53
CP-07 SIKA 204 0.00 0.00
CP-0602 SIKA 3006 ES 0.00 56.58
CP-0602 O-BASF 8320 0.00 0.00
CP-0602
CP-0602
CP-07

UCY BP-01 UCY BP-02


CEMENT 49.20 0.00
SAND 100.32 0.00
STONE 125.40 0.00
SIKA 204 541.20 0.00
SIKA 3006 ES 0.00 0.00
O-BASF 8320 0.00 0.00

CP-03&04
UCY BP-01 UCY BP-02
CEMENT 1.47 5.41
SAND 2.95 11.04
STONE 3.62 12.45
SIKA 204 0.00 0.00
SIKA 3006 ES 0.00 8.28
O-BASF 8320 14.70 37.95
SIKA LATEX POWER 0.00 0.00

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 3.50 12.5 16.00
CP-07 120 0.00 120.00
CP-0602 0 20.5 20.50

total
65.51 tons
131.20 tons
163.00 tons
541.20 kg
64.86 kg
52.65 kg
0.00 kg

total
9.43 tons
16.89 tons
21.53 tons
0.00 kg
56.58 kg
0.00 kg

total
49.20 tons
100.32 tons
125.40 tons
541.20 kg
0.00 kg
0.00 kg
total
6.88 tons
13.99 tons
16.07 tons
0.00 kg
8.28 kg
52.65 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 21/02/2021
Summary RQ
DATE Plant RQ NO Material QTY
21/2/2021 UCY BP-02 280894 CEMENT 1.38
21/2/2021 UCY BP-02 280895 SAND 2.52
21/2/2021 UCY BP-02 280896 STONE 3.11
21/2/2021 UCY BP-02 280897 SIKA 3006 ES 8.28
21/2/2021 UCY BP-02 280898 CEMENT 0.25
21/2/2021 UCY BP-02 280899 SAND 0.78
21/2/2021 UCY BP-02 280900 O-BASF 8320 1.50
21/2/2021 UCY BP-02 - CEMENT 15.99
21/2/2021 UCY BP-02 - SAND 32.53
21/2/2021 UCY BP-02 - STONE 40.76
21/2/2021 UCY BP-02 - SIKA 204 175.89
Record BY
Operator
21
SUBJOB RECORDER
20103-TRAFFICM CEMENT 17.62 tons
20103-TRAFFICM SAND 35.83 tons
20103-TRAFFICM STONE 43.87 tons
20103-TRAFFICM SIKA 204 175.89 kg
S4000-C3S1-SUB SIKA 3006 ES 8.28 kg
S4000-C3S1-SUB O-BASF 8320 1.50 kg
S4000-C3S1-SUB SIKA LATEX POWER 0.00 kg
CP-07
CP-07 UCY BP-01 UCY BP-02
CP-07 CEMENT 0.00 17.62
CP-07 SAND 0.00 35.83
STONE 0.00 43.87
SIKA 204 0.00 175.89
SIKA 3006 ES 0.00 8.28
O-BASF 8320 0.00 1.50
SIKA LATEX POWER 0.00 0.00

CP-0602

UCY BP-01 UCY BP-02


CEMENT 0.00 0.00
SAND 0.00 0.00
STONE 0.00 0.00
SIKA 204 0.00 0.00
SIKA 3006 ES 0.00 0.00
O-BASF 8320 0.00 0.00

CP-07

UCY BP-01 UCY BP-02


CEMENT 0.00 15.99
SAND 0.00 32.53
STONE 0.00 40.76
SIKA 204 0.00 175.89
SIKA 3006 ES 0.00 0.00
O-BASF 8320 0.00 0.00

CP-03&04
UCY BP-01 UCY BP-02
CEMENT 0.00 1.63
SAND 0.00 3.30
STONE 0.00 3.11
SIKA 204 0.00 0.00
SIKA 3006 ES 0.00 8.28
O-BASF 8320 0.00 1.50
SIKA LATEX POWER 0.00 0.00

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 0.00 1.63 1.63
CP-07 0 39.00 39.00
CP-0602 0.00 0.00 0.00

total
17.62 tons
35.83 tons
43.87 tons
175.89 kg
8.28 kg
1.50 kg
0.00 kg

total
0.00 tons
0.00 tons
0.00 tons
0.00 kg
0.00 kg
0.00 kg

total
15.99 tons
32.53 tons
40.76 tons
175.89 kg
0.00 kg
0.00 kg
total
1.63 tons
3.30 tons
3.11 tons
0.00 kg
8.28 kg
1.50 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 22/02/2021
Summary RQ
DATE Plant RQ NO Material QTY
22/2/2021 UCY BP-01 280601 CEMENT 44.18
22/2/2021 UCY BP-01 280602 SAND 89.35
22/2/2021 UCY BP-01 280603 STONE 107.54
22/2/2021 UCY BP-01 280604 O-BASF 8320 439.80
22/2/2021 UCY BP-01 280605 CEMENT 2.30
22/2/2021 UCY BP-01 280606 SAND 4.58
22/2/2021 UCY BP-01 280607 STONE 4.67
22/2/2021 UCY BP-01 280608 O-BASF 8320 20.70
22/2/2021 UCY BP-02 280609 CEMENT 1.24
22/2/2021 UCY BP-02 280610 SAND 2.25
22/2/2021 UCY BP-02 280611 STONE 3.11
22/2/2021 UCY BP-02 280612 SIKA 3006 ES 7.45
22/2/2021 UCY BP-02 280613 CEMENT 1.38
22/2/2021 UCY BP-02 280614 SAND 2.50
22/2/2021 UCY BP-02 280615 STONE 2.80
22/2/2021 UCY BP-02 280616 SIKA 3006 ES 8.28
22/2/2021 UCY BP-02 280617 CEMENT 1.72
22/2/2021 UCY BP-02 280618 SAND 3.68
22/2/2021 UCY BP-02 280619 STONE 4.43
22/2/2021 UCY BP-02 280620 O-BASF 8320 15.50
22/2/2021 UCY BP-02 280621 CEMENT 0.37
22/2/2021 UCY BP-02 280622 SAND 1.51
22/2/2021 UCY BP-02 280623 STONE 1.69
22/2/2021 UCY BP-02 280624 O-BASF 8320 3.68
22/2/2021 UCY BP-02 280625 CEMENT 0.69
22/2/2021 UCY BP-02 280626 SAND 1.25
22/2/2021 UCY BP-02 280627 STONE 1.56
22/2/2021 UCY BP-02 280628 O-BASF 8320 6.90
22/2/2021 UCY BP-02 280629 CEMENT 0.63
22/2/2021 UCY BP-02 280630 SAND 1.27
22/2/2021 UCY BP-02 280631 STONE 1.55
22/2/2021 UCY BP-02 280632 O-BASF 8320 6.30
22/2/2021 UCY BP-02 280633 CEMENT 0.84
22/2/2021 UCY BP-02 280634 SAND 1.69
22/2/2021 UCY BP-02 280635 STONE 2.07
22/2/2021 UCY BP-02 280636 O-BASF 8320 8.40
22/2/2021 UCY BP-02 280637 CEMENT 10.92
22/2/2021 UCY BP-02 280638 SAND 21.94
22/2/2021 UCY BP-02 280639 STONE 26.88
22/2/2021 UCY BP-02 280639 O-BASF 8320 109.20
22/2/2021 UCY BP-01 - CEMENT 10.87
22/2/2021 UCY BP-01 - SAND 22.05
22/2/2021 UCY BP-01 - STONE 27.69
22/2/2021 UCY BP-01 - SIKA 204 119.52
22/2/2021 UCY BP-01 - CEMENT 15.79
22/2/2021 UCY BP-01 - SAND 32.03
22/2/2021 UCY BP-01 - STONE 40.23
22/2/2021 UCY BP-01 - O-BASF 8320 173.64
22/2/2021 UCY BP-02 - CEMENT 51.34
22/2/2021 UCY BP-02 - SAND 93.35
22/2/2021 UCY BP-02 - STONE 118.67
22/2/2021 UCY BP-02 - SIKA 3006 ES 300.72

Record BY
Operator
21
SUBJOB RECORDER
S4000-C3S4-SUB CEMENT 142.27 tons
S4000-C3S4-SUB SAND 277.45 tons
S4000-C3S4-SUB STONE 342.89 tons
S4000-C3S4-SUB SIKA 204 119.52 kg
S4000-C4S5-SUB SIKA 3006 ES 316.45 kg
S4000-C4S5-SUB O-BASF 8320 784.12 kg
S4000-C4S5-SUB SIKA LATEX POWER 0.00 kg
S4000-C4S5-SUB
28001-SP-A-SUP UCY BP-01 UCY BP-02
28001-SP-A-SUP CEMENT 73.14 69.13
28001-SP-A-SUP SAND 148.01 129.44
28001-SP-A-SUP STONE 180.13 162.76
20103-TRAFFICM SIKA 204 119.52 0.00
20103-TRAFFICM SIKA 3006 ES 0.00 316.45
20103-TRAFFICM O-BASF 8320 634.14 149.98
20103-TRAFFICM SIKA LATEX POWER 0.00 0.00
24000-C3ML-SUB
24000-C3ML-SUB CP-0602
24000-C3ML-SUB
24000-C3ML-SUB UCY BP-01 UCY BP-02
20106-TRAFFICM CEMENT 0.00 51.34
20106-TRAFFICM SAND 0.00 93.35
20106-TRAFFICM STONE 0.00 118.67
20106-TRAFFICM SIKA 204 0.00 0.00
S4000-C3S2-SUB SIKA 3006 ES 0.00 300.72
S4000-C3S2-SUB O-BASF 8320 0.00 0.00
S4000-C3S2-SUB
S4000-C3S2-SUB
33003-C3S4-ARC CP-07
33003-C3S4-ARC
33003-C3S4-ARC UCY BP-01 UCY BP-02
33003-C3S4-ARC CEMENT 26.66 0.00
33003-C4S5-ARC SAND 54.08 0.00
33003-C4S5-ARC STONE 67.92 0.00
33003-C4S5-ARC SIKA 204 119.52 0.00
33003-C4S5-ARC SIKA 3006 ES 0.00 0.00
S4000-C3S4-SUB O-BASF 8320 173.64 0.00
S4000-C3S4-SUB
S4000-C3S4-SUB
S4000-C3S4-SUB CP-03&04
CP-07
CP-07 UCY BP-01 UCY BP-02
CP-07 CEMENT 46.48 17.79
CP-07 SAND 93.93 36.09
CP-07 STONE 112.21 44.09
CP-07 SIKA 204 0.00 0.00
CP-07 SIKA 3006 ES 0.00 15.73
CP-07 O-BASF 8320 460.50 149.98
CP-0602 SIKA LATEX POWER 0.00 0.00
CP-0602
CP-0602
CP-0602

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 110.00 42.5 152.50
CP-07 65 0.00 65.00
CP-0602 0 113.2 113.20

total
142.27 tons
277.45 tons
342.89 tons
119.52 kg
316.45 kg
784.12 kg
0.00 kg

total
51.34 tons
93.35 tons
118.67 tons
0.00 kg
300.72 kg
0.00 kg

total
26.66 tons
54.08 tons
67.92 tons
119.52 kg
0.00 kg
173.64 kg
total
64.27 tons
130.02 tons
156.30 tons
0.00 kg
15.73 kg
610.48 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 23/02/2021
Summary RQ
DATE Plant RQ NO Material QTY
23/2/2021 UCY BP-01 280641 CEMENT 1.24
23/2/2021 UCY BP-01 280642 SAND 2.26
23/2/2021 UCY BP-01 280643 STONE 2.79
23/2/2021 UCY BP-01 280644 SIKA 3006 ES 7.45
23/2/2021 UCY BP-01 280645 CEMENT 1.38
23/2/2021 UCY BP-01 280646 SAND 2.51
23/2/2021 UCY BP-01 280647 STONE 3.10
23/2/2021 UCY BP-01 280648 SIKA 3006 ES 8.28
23/2/2021 UCY BP-01 280649 CEMENT 1.72
23/2/2021 UCY BP-01 280650 SAND 3.69
23/2/2021 UCY BP-01 280651 STONE 4.41
23/2/2021 UCY BP-01 280652 O-BASF 8320 15.50
23/2/2021 UCY BP-01 280653 CEMENT 1.73
23/2/2021 UCY BP-01 280654 SAND 7.11
23/2/2021 UCY BP-01 280655 STONE 7.88
23/2/2021 UCY BP-01 280656 O-BASF 8320 17.25
23/2/2021 UCY BP-01 280657 CEMENT 1.15
23/2/2021 UCY BP-01 280658 SAND 2.10
23/2/2021 UCY BP-01 280659 STONE 2.59
23/2/2021 UCY BP-01 280660 O-BASF 8320 11.50
23/2/2021 UCY BP-01 280661 CEMENT 2.07
23/2/2021 UCY BP-01 280662 SAND 3.79
23/2/2021 UCY BP-01 280663 STONE 4.65
23/2/2021 UCY BP-01 280664 O-BASF 8320 20.70
23/2/2021 UCY BP-01 280665 CEMENT 3.91
23/2/2021 UCY BP-01 280666 SAND 7.15
23/2/2021 UCY BP-01 280667 STONE 8.79
23/2/2021 UCY BP-01 280668 O-BASF 8320 39.10
23/2/2021 UCY BP-01 280669 CEMENT 0.23
23/2/2021 UCY BP-01 280670 SAND 0.80
23/2/2021 UCY BP-01 CEMENT 31.37
23/2/2021 UCY BP-01 SAND 63.04
23/2/2021 UCY BP-01 STONE 80.25
23/2/2021 UCY BP-01 SIKA 204 345.02
23/2/2021 UCY BP-01 CEMENT 4.88
23/2/2021 UCY BP-01 SAND 10.03
23/2/2021 UCY BP-01 STONE 12.70
23/2/2021 UCY BP-01 SIKA 3006 ES 21.96
23/2/2021 UCY BP-02 CEMENT 67.62
23/2/2021 UCY BP-02 SAND 120.54
23/2/2021 UCY BP-02 STONE 155.09
23/2/2021 UCY BP-02 SIKA 3006 ES 405.72

Record BY
Operator
21
SUBJOB RECORDER
28001-SP-A-SUP CEMENT 117.30 tons
28001-SP-A-SUP SAND 223.02 tons
28001-SP-A-SUP STONE 282.25 tons
28001-SP-A-SUP SIKA 204 345.02 kg
20103-TRAFFICM SIKA 3006 ES 443.41 kg
20103-TRAFFICM O-BASF 8320 104.05 kg
20103-TRAFFICM SIKA LATEX POWER 0.00 kg
20103-TRAFFICM
24000-C3ML-SUB UCY BP-01 UCY BP-02
24000-C3ML-SUB CEMENT 49.68 67.62
24000-C3ML-SUB SAND 102.48 120.54
24000-C3ML-SUB STONE 127.16 155.09
S4000-C3S2-SUB SIKA 204 345.02 0.00
S4000-C3S2-SUB SIKA 3006 ES 37.69 405.72
S4000-C3S2-SUB O-BASF 8320 104.05 0.00
S4000-C3S2-SUB SIKA LATEX POWER 0.00 0.00
S4000-C4S5-SUB
S4000-C4S5-SUB CP-0602
S4000-C4S5-SUB
S4000-C4S5-SUB UCY BP-01 UCY BP-02
26101-C3ML-SUB CEMENT 4.88 67.62
26101-C3ML-SUB SAND 10.03 120.54
26101-C3ML-SUB STONE 12.70 155.09
26101-C3ML-SUB SIKA 204 0.00 0.00
S4000-C4S4-SUB SIKA 3006 ES 21.96 405.72
S4000-C4S4-SUB O-BASF 8320 0.00 0.00
S4000-C4S4-SUB
S4000-C4S4-SUB
S4000-C4S4-SUB CP-07
S4000-C4S4-SUB
CP-07 UCY BP-01 UCY BP-02
CP-07 CEMENT 31.37 0.00
CP-07 SAND 63.04 0.00
CP-07 STONE 80.25 0.00
CP-0602 SIKA 204 345.02 0.00
CP-0602 SIKA 3006 ES 0.00 0.00
CP-0602 O-BASF 8320 0.00 0.00
CP-0602
CP-0602
CP-0602 CP-03&04
CP-0602
CP-0602 UCY BP-01 UCY BP-02
CEMENT 13.43 0.00
SAND 29.41 0.00
STONE 34.21 0.00
SIKA 204 0.00 0.00
SIKA 3006 ES 15.73 0.00
O-BASF 8320 104.05 0.00
SIKA LATEX POWER 0.00 0.00

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 33.40 0 33.40
CP-07 76.5 0.00 76.50
CP-0602 12.2 147 159.20

total
117.30 tons
223.02 tons
282.25 tons
345.02 kg
443.41 kg
104.05 kg
0.00 kg

total
72.50 tons
130.57 tons
167.79 tons
0.00 kg
427.68 kg
0.00 kg

total
31.37 tons
63.04 tons
80.25 tons
345.02 kg
0.00 kg
0.00 kg
total
13.43 tons
29.41 tons
34.21 tons
0.00 kg
15.73 kg
104.05 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 24/02/2021
Summary RQ
DATE Plant RQ NO Material QTY
24/2/2021 UCY BP-02 282401 CEMENT 1.24
24/2/2021 UCY BP-02 282402 SAND 2.25
24/2/2021 UCY BP-02 282403 STONE 2.80
24/2/2021 UCY BP-02 282404 SIKA 3006 ES 7.45
24/2/2021 UCY BP-02 282405 CEMENT 1.38
24/2/2021 UCY BP-02 282406 SAND 2.50
24/2/2021 UCY BP-02 282407 STONE 3.11
24/2/2021 UCY BP-02 282408 SIKA 3006 ES 8.28
24/2/2021 UCY BP-02 282409 CEMENT 1.72
24/2/2021 UCY BP-02 282410 SAND 3.68
24/2/2021 UCY BP-02 282411 STONE 4.42
24/2/2021 UCY BP-02 282412 O-BASF 8320 15.50
24/2/2021 UCY BP-02 282413 CEMENT 4.60
24/2/2021 UCY BP-02 282414 SAND 18.88
24/2/2021 UCY BP-02 282415 STONE 21.04
24/2/2021 UCY BP-02 282416 O-BASF 8320 46.00
24/2/2021 UCY BP-02 282417 CEMENT 0.50
24/2/2021 UCY BP-02 282418 SAND 1.01
24/2/2021 UCY BP-02 282419 STONE 1.24
24/2/2021 UCY BP-02 282420 O-BASF 8320 5.04
24/2/2021 UCY BP-02 282421 CEMENT 1.26
24/2/2021 UCY BP-02 282422 SAND 2.51
24/2/2021 UCY BP-02 282423 STONE 3.11
24/2/2021 UCY BP-02 282424 O-BASF 8320 12.60
24/2/2021 UCY BP-02 282425 CEMENT 8.19
24/2/2021 UCY BP-02 282426 SAND 16.34
24/2/2021 UCY BP-02 282427 STONE 20.20
24/2/2021 UCY BP-02 282428 O-BASF 8320 81.90
24/2/2021 UCY BP-02 282429 CEMENT 1.15
24/2/2021 UCY BP-02 282430 SAND 2.08
24/2/2021 UCY BP-02 282431 STONE 2.59
24/2/2021 UCY BP-02 282432 O-BASF 8320 11.50
24/2/2021 UCY BP-02 282433 CEMENT 0.23
24/2/2021 UCY BP-02 282434 SAND 0.80
24/2/2021 UCY BP-01 CEMENT 1.23
24/2/2021 UCY BP-01 SAND 2.47
24/2/2021 UCY BP-01 STONE 3.15
24/2/2021 UCY BP-01 SIKA 204 13.53
24/2/2021 UCY BP-02 CEMENT 27.88
24/2/2021 UCY BP-02 SAND 56.58
24/2/2021 UCY BP-02 STONE 71.06
24/2/2021 UCY BP-02 SIKA 204 306.68
24/2/2021 UCY BP-02 CEMENT 4.88
24/2/2021 UCY BP-02 SAND 10.08
24/2/2021 UCY BP-02 STONE 12.72
24/2/2021 UCY BP-02 SIKA 3006 ES 21.96

Record BY
Operator
21
SUBJOB RECORDER
28001 SP-A-SUP CEMENT 54.26 tons
28001 SP-A-SUP SAND 119.18 tons
28001 SP-A-SUP STONE 145.44 tons
28001 SP-A-SUP SIKA 204 320.21 kg
20103-TRAFFICM SIKA 3006 ES 37.69 kg
20103-TRAFFICM O-BASF 8320 172.54 kg
20103-TRAFFICM SIKA LATEX POWER 0.00 kg
20103-TRAFFICM
24000 C3ML-SUB UCY BP-01 UCY BP-02
24000 C3ML-SUB CEMENT 1.23 53.03
24000 C3ML-SUB SAND 2.47 116.71
24000 C3ML-SUB STONE 3.15 142.29
S4000-C3S2-SUB SIKA 204 13.53 306.68
S4000-C3S2-SUB SIKA 3006 ES 0.00 37.69
S4000-C3S2-SUB O-BASF 8320 0.00 172.54
S4000-C3S2-SUB SIKA LATEX POWER 0.00 0.00
33003-C3S4-ARC
33003-C3S4-ARC CP-0602
33003-C3S4-ARC
33003-C3S4-ARC UCY BP-01 UCY BP-02
33003-C3S3-ARC CEMENT 0.00 4.88
33003-C3S3-ARC SAND 0.00 10.08
33003-C3S3-ARC STONE 0.00 12.72
33003-C3S3-ARC SIKA 204 0.00 0.00
S4000-C3S1-SUB SIKA 3006 ES 0.00 21.96
S4000-C3S1-SUB O-BASF 8320 0.00 0.00
S4000-C3S1-SUB
S4000-C3S1-SUB
28006-C3ML-SUB CP-07
28006-C3ML-SUB
28006-C3ML-SUB UCY BP-01 UCY BP-02
28006-C3ML-SUB CEMENT 1.23 27.88
S4000-C3S1-SUB SAND 2.47 56.58
S4000-C3S1-SUB STONE 3.15 71.06
CP-07 SIKA 204 13.53 306.68
CP-07 SIKA 3006 ES 0.00 0.00
CP-07 O-BASF 8320 0.00 0.00
CP-07
CP-07
CP-07 CP-03&04
CP-07
CP-07 UCY BP-01 UCY BP-02
CP-0602 CEMENT 0.00 20.27
CP-0602 SAND 0.00 50.05
CP-0602 STONE 0.00 58.51
CP-0602 SIKA 204 0.00 0.00
SIKA 3006 ES 0.00 15.73
O-BASF 8320 0.00 172.54
SIKA LATEX POWER 0.00 0.00

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 0.00 56.6 56.60
CP-07 3 68.00 71.00
CP-0602 139.5 12.2 151.70

total
54.26 tons
119.18 tons
145.44 tons
320.21 kg
37.69 kg
172.54 kg
0.00 kg

total
4.88 tons
10.08 tons
12.72 tons
0.00 kg
21.96 kg
0.00 kg

total
29.11 tons
59.05 tons
74.21 tons
320.21 kg
0.00 kg
0.00 kg
total
20.27 tons
50.05 tons
58.51 tons
0.00 kg
15.73 kg
172.54 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 25/02/2021
Summary RQ
DATE Plant RQ NO Material QTY
25/2/2021 UCY BP-01 280435 CEMENT 2.96
25/2/2021 UCY BP-01 280436 SAND 6.26
25/2/2021 UCY BP-01 280437 STONE 6.71
25/2/2021 UCY BP-01 280438 O-BASF 8320 27.30
25/2/2021 UCY BP-01 280439 CEMENT 0.41
25/2/2021 UCY BP-01 280440 SAND 1.70
25/2/2021 UCY BP-01 280441 STONE 1.89
25/2/2021 UCY BP-01 280442 O-BASF 8320 4.14
25/2/2021 UCY BP-01 280443 CEMENT 1.47
25/2/2021 UCY BP-01 280444 SAND 2.94
25/2/2021 UCY BP-01 280445 STONE 3.61
25/2/2021 UCY BP-01 280446 O-BASF 8320 14.70
25/2/2021 UCY BP-01 280447 CEMENT 0.42
25/2/2021 UCY BP-01 280448 SAND 0.84
25/2/2021 UCY BP-01 280449 STONE 1.03
25/2/2021 UCY BP-01 280450 O-BASF 8320 4.20
25/2/2021 UCY BP-02 280451 CEMENT 1.24
25/2/2021 UCY BP-02 280452 SAND 2.26
25/2/2021 UCY BP-02 280453 STONE 2.78
25/2/2021 UCY BP-02 280454 SIKA 3006 ES 7.45
25/2/2021 UCY BP-02 280455 CEMENT 1.38
25/2/2021 UCY BP-02 280456 SAND 2.51
25/2/2021 UCY BP-02 280457 STONE 3.10
25/2/2021 UCY BP-02 280458 SIKA 3006 ES 8.28
25/2/2021 UCY BP-02 280459 CEMENT 1.72
25/2/2021 UCY BP-02 280460 SAND 3.69
25/2/2021 UCY BP-02 280461 STONE 4.41
25/2/2021 UCY BP-02 280462 O-BASF 8320 15.50
25/2/2021 UCY BP-02 280463 CEMENT 2.30
25/2/2021 UCY BP-02 280464 SAND 9.46
25/2/2021 UCY BP-02 280465 STONE 10.49
25/2/2021 UCY BP-02 280466 O-BASF 8320 23.00
25/2/2021 UCY BP-02 280467 CEMENT 1.38
25/2/2021 UCY BP-02 280468 SAND 2.51
25/2/2021 UCY BP-02 280469 STONE 3.10
25/2/2021 UCY BP-02 280470 O-BASF 8320 13.80
25/2/2021 UCY BP-01 CEMENT 2.46
25/2/2021 UCY BP-01 SAND 4.93
25/2/2021 UCY BP-01 STONE 6.25
25/2/2021 UCY BP-01 SIKA 204 27.06
25/2/2021 UCY BP-02 CEMENT 42.64
25/2/2021 UCY BP-02 SAND 86.63
25/2/2021 UCY BP-02 STONE 108.47
25/2/2021 UCY BP-02 SIKA 204 469.04
25/2/2021 UCY BP-01 CEMENT 48.93
25/2/2021 UCY BP-01 SAND 88.04
25/2/2021 UCY BP-01 STONE 113.58
25/2/2021 UCY BP-01 SIKA 3006 ES 287.46
25/2/2021 UCY BP-02 CEMENT 0.80
25/2/2021 UCY BP-02 SAND 1.65
25/2/2021 UCY BP-02 STONE 2.08
25/2/2021 UCY BP-02 SIKA 3006 ES 3.60

Record BY
Operator
21
SUBJOB RECORDER
24000-C3S1-SUB CEMENT 108.11 tons
24000-C3S1-SUB SAND 213.42 tons
24000-C3S1-SUB STONE 267.50 tons
24000-C3S1-SUB SIKA 204 496.10 kg
20106-TRAFFICUM SIKA 3006 ES 306.79 kg
20106-TRAFFICUM O-BASF 8320 102.64 kg
20106-TRAFFICUM SIKA LATEX POWER 0.00 kg
20106-TRAFFICUM
S4000-C3S2-SUB UCY BP-01 UCY BP-02
S4000-C3S2-SUB CEMENT 56.65 51.46
S4000-C3S2-SUB SAND 104.71 108.71
S4000-C3S2-SUB STONE 133.07 134.43
S4000-C3S4-SUB SIKA 204 27.06 469.04
S4000-C3S4-SUB SIKA 3006 ES 287.46 19.33
S4000-C3S4-SUB O-BASF 8320 50.34 52.30
S4000-C3S4-SUB SIKA LATEX POWER 0.00 0.00
28001-SP-A-SUP
28001-SP-A-SUP CP-0602
28001-SP-A-SUP
28001-SP-A-SUP UCY BP-01 UCY BP-02
20103-TRAFFICUM CEMENT 48.93 0.80
20103-TRAFFICUM SAND 88.04 1.65
20103-TRAFFICUM STONE 113.58 2.08
20103-TRAFFICUM SIKA 204 0.00 0.00
24000-C3ML-SUB SIKA 3006 ES 287.46 3.60
24000-C3ML-SUB O-BASF 8320 0.00 0.00
24000-C3ML-SUB
24000-C3ML-SUB
S4000-C3S2-SUB CP-07
S4000-C3S2-SUB
S4000-C3S2-SUB UCY BP-01 UCY BP-02
S4000-C3S2-SUB CEMENT 2.46 42.64
28006-C3ML-SUB SAND 4.93 86.63
28006-C3ML-SUB STONE 6.25 108.47
28006-C3ML-SUB SIKA 204 27.06 469.04
28006-C3ML-SUB SIKA 3006 ES 0.00 0.00
CP-07 O-BASF 8320 0.00 0.00
CP-07
CP-07
CP-07 CP-03&04
CP-07
CP-07 UCY BP-01 UCY BP-02
CP-07 CEMENT 5.26 8.02
CP-07 SAND 11.74 20.43
CP-0602 STONE 13.24 23.88
CP-0602 SIKA 204 0.00 0.00
CP-0602 SIKA 3006 ES 0.00 15.73
CP-0602 O-BASF 8320 50.34 52.30
CP-0602 SIKA LATEX POWER 0.00 0.00
CP-0602
CP-0602
CP-0602

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 13.30 22.9 36.20
CP-07 6 104.00 110.00
CP-0602 107.7 2 109.70

total
108.11 tons
213.42 tons
267.50 tons
496.10 kg
306.79 kg
102.64 kg
0.00 kg

total
49.73 tons
89.69 tons
115.66 tons
0.00 kg
291.06 kg
0.00 kg

total
45.10 tons
91.56 tons
114.72 tons
496.10 kg
0.00 kg
0.00 kg
total
13.28 tons
32.17 tons
37.12 tons
0.00 kg
15.73 kg
102.64 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 26/02/2021
Summary RQ
DATE Plant RQ NO Material QTY
26/2/2021 UCY BP-02 282471 CEMENT 1.38
26/2/2021 UCY BP-02 282472 SAND 2.51
26/2/2021 UCY BP-02 282473 STONE 3.10
26/2/2021 UCY BP-02 282474 SIKA 3006 ES 8.28
26/2/2021 UCY BP-02 282475 CEMENT 2.16
26/2/2021 UCY BP-02 282476 SAND 3.94
26/2/2021 UCY BP-02 282477 STONE 4.86
26/2/2021 UCY BP-02 282478 SIKA 3006 ES 7.45
26/2/2021 UCY BP-02 282479 O-BASF 8320 9.20
26/2/2021 UCY BP-02 282480 CEMENT 1.72
26/2/2021 UCY BP-02 282481 SAND 3.67
26/2/2021 UCY BP-02 282482 STONE 4.41
26/2/2021 UCY BP-02 282483 O-BASF 8320 15.50
26/2/2021 UCY BP-02 282484 CEMENT 0.28
26/2/2021 UCY BP-02 282485 SAND 1.14
26/2/2021 UCY BP-02 282486 STONE 1.26
26/2/2021 UCY BP-02 282487 O-BASF 8320 2.76
26/2/2021 UCY BP-02 282488 CEMENT 2.07
26/2/2021 UCY BP-02 282489 SAND 4.17
26/2/2021 UCY BP-02 282490 STONE 4.15
26/2/2021 UCY BP-02 282491 O-BASF 8320 18.40
26/2/2021 UCY BP-02 CEMENT 1.44
26/2/2021 UCY BP-02 SAND 2.92
26/2/2021 UCY BP-02 STONE 3.65
26/2/2021 UCY BP-02 SIKA 204 15.79
26/2/2021 UCY BP-02 CEMENT 3.52
26/2/2021 UCY BP-02 SAND 7.27
26/2/2021 UCY BP-02 STONE 9.17
26/2/2021 UCY BP-02 SIKA 3006 ES 15.84
Record BY
Operator
21
SUBJOB RECORDER
20103-TRAFFICM CEMENT 12.57 tons
20103-TRAFFICM SAND 25.62 tons
20103-TRAFFICM STONE 30.60 tons
20103-TRAFFICM SIKA 204 15.79 kg
28001-SP-A-SUP SIKA 3006 ES 31.57 kg
28001-SP-A-SUP O-BASF 8320 45.86 kg
28001-SP-A-SUP SIKA LATEX POWER 0.00 kg
28001-SP-A-SUP
28001-SP-A-SUP UCY BP-01 UCY BP-02
24000-C3ML-SUB CEMENT 0.00 12.57
24000-C3ML-SUB SAND 0.00 25.62
24000-C3ML-SUB STONE 0.00 30.60
24000-C3ML-SUB SIKA 204 0.00 15.79
20106 TRAFFICM SIKA 3006 ES 0.00 31.57
20106 TRAFFICM O-BASF 8320 0.00 45.86
20106 TRAFFICM SIKA LATEX POWER 0.00 0.00
20106 TRAFFICM
S4000-C3S4-SUB CP-0602
S4000-C3S4-SUB
S4000-C3S4-SUB UCY BP-01 UCY BP-02
S4000-C3S4-SUB CEMENT 0.00 3.52
CP-07 SAND 0.00 7.27
CP-07 STONE 0.00 9.17
CP-07 SIKA 204 0.00 0.00
CP-07 SIKA 3006 ES 0.00 15.84
CP-0602 O-BASF 8320 0.00 0.00
CP-0602
CP-0602
CP-0602 CP-07

UCY BP-01 UCY BP-02


CEMENT 0.00 1.44
SAND 0.00 2.92
STONE 0.00 3.65
SIKA 204 0.00 15.79
SIKA 3006 ES 0.00 0.00
O-BASF 8320 0.00 0.00

CP-03&04
UCY BP-01 UCY BP-02
CEMENT 0.00 7.61
SAND 0.00 15.43
STONE 0.00 17.78
SIKA 204 0.00 0.00
SIKA 3006 ES 0.00 15.73
O-BASF 8320 0.00 45.86
SIKA LATEX POWER 0.00 0.00

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 0.00 17.6 17.60
CP-07 0 3.50 3.50
CP-0602 124.5 8.8 133.30

total
12.57 tons
25.62 tons
30.60 tons
15.79 kg
31.57 kg
45.86 kg
0.00 kg

total
3.52 tons
7.27 tons
9.17 tons
0.00 kg
15.84 kg
0.00 kg

total
1.44 tons
2.92 tons
3.65 tons
15.79 kg
0.00 kg
0.00 kg
total
7.61 tons
15.43 tons
17.78 tons
0.00 kg
15.73 kg
45.86 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 27/02/2021
Summary RQ
DATE Plant RQ NO Material QTY
27/2/2021 UCY BP-01 280671 CEMENT 1.56
27/2/2021 UCY BP-01 280672 SAND 2.85
27/2/2021 UCY BP-01 280673 STONE 3.51
27/2/2021 UCY BP-01 280674 SIKA 3006 ES 9.38
27/2/2021 UCY BP-01 280675 CEMENT 1.38
27/2/2021 UCY BP-01 280676 SAND 2.51
27/2/2021 UCY BP-01 280677 STONE 3.10
27/2/2021 UCY BP-01 280678 SIKA 3006 ES 8.28
27/2/2021 UCY BP-01 280679 CEMENT 1.15
27/2/2021 UCY BP-01 280680 SAND 2.10
27/2/2021 UCY BP-01 280681 STONE 2.58
27/2/2021 UCY BP-01 280682 O-BASF 8320 11.50
27/2/2021 UCY BP-01 280683 CEMENT 2.07
27/2/2021 UCY BP-01 280684 SAND 3.77
27/2/2021 UCY BP-01 280685 STONE 4.65
27/2/2021 UCY BP-01 280686 O-BASF 8320 20.70
27/2/2021 UCY BP-02 280687 CEMENT 8.42
27/2/2021 UCY BP-02 280688 SAND 17.22
27/2/2021 UCY BP-02 280689 STONE 20.14
27/2/2021 UCY BP-02 280690 O-BASF 8320 81.90
27/2/2021 UCY BP-02 280691 CEMENT 1.72
27/2/2021 UCY BP-02 280692 SAND 3.70
27/2/2021 UCY BP-02 280693 STONE 4.41
27/2/2021 UCY BP-02 280694 O-BASF 8320 15.50
27/2/2021 UCY BP-02 280695 CEMENT 1.15
27/2/2021 UCY BP-02 280696 SAND 4.75
27/2/2021 UCY BP-02 280697 STONE 5.25
27/2/2021 UCY BP-02 280698 O-BASF 8320 11.50
27/2/2021 UCY BP-02 CEMENT 32.80
27/2/2021 UCY BP-02 SAND 65.92
27/2/2021 UCY BP-02 STONE 83.28
27/2/2021 UCY BP-02 SIKA 204 360.80
27/2/2021 UCY BP-01 CEMENT 58.01
27/2/2021 UCY BP-01 SAND 104.90
27/2/2021 UCY BP-01 STONE 134.25
27/2/2021 UCY BP-01 SIKA 3006 ES 340.74
Record BY
Operator
21
SUBJOB RECORDER
28001-SP-A-SUP CEMENT 108.26 tons
28001-SP-A-SUP SAND 207.72 tons
28001-SP-A-SUP STONE 261.17 tons
28001-SP-A-SUP SIKA 204 360.80 kg
20103 TRAFFICM SIKA 3006 ES 358.40 kg
20103 TRAFFICM O-BASF 8320 141.10 kg
20103 TRAFFICM SIKA LATEX POWER 0.00 kg
20103 TRAFFICM
S4000-C3S2-SUB UCY BP-01 UCY BP-02
S4000-C3S2-SUB CEMENT 64.17 44.09
S4000-C3S2-SUB SAND 116.13 91.59
S4000-C3S2-SUB STONE 148.09 113.08
S4000-C3S4-SUB SIKA 204 0.00 360.80
S4000-C3S4-SUB SIKA 3006 ES 358.40 0.00
S4000-C3S4-SUB O-BASF 8320 32.20 108.90
S4000-C3S4-SUB SIKA LATEX POWER 0.00 0.00
S4000-C3S1-SUB
S4000-C3S1-SUB CP-0602
S4000-C3S1-SUB
S4000-C3S1-SUB UCY BP-01 UCY BP-02
28003-C3ML-SUB CEMENT 58.01 0.00
28003-C3ML-SUB SAND 104.90 0.00
28003-C3ML-SUB STONE 134.25 0.00
28003-C3ML-SUB SIKA 204 0.00 0.00
S4000-C3S2-SUB SIKA 3006 ES 340.74 0.00
S4000-C3S2-SUB O-BASF 8320 0.00 0.00
S4000-C3S2-SUB
S4000-C3S2-SUB
CP-07 CP-07
CP-07
CP-07 UCY BP-01 UCY BP-02
CP-07 CEMENT 0.00 32.80
CP-0602 SAND 0.00 65.92
CP-0602 STONE 0.00 83.28
CP-0602 SIKA 204 0.00 360.80
CP-0602 SIKA 3006 ES 0.00 0.00
O-BASF 8320 0.00 0.00

CP-03&04
UCY BP-01 UCY BP-02
CEMENT 6.16 11.29
SAND 11.23 25.67
STONE 13.84 29.80
SIKA 204 0.00 0.00
SIKA 3006 ES 17.66 0.00
O-BASF 8320 32.20 108.90
SIKA LATEX POWER 0.00 0.00

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 0.00 29.2 29.20
CP-07 0 80.00 80.00
CP-0602 127.7 127.70

total
108.26 tons
207.72 tons
261.17 tons
360.80 kg
358.40 kg
141.10 kg
0.00 kg

total
58.01 tons
104.90 tons
134.25 tons
0.00 kg
340.74 kg
0.00 kg

total
32.80 tons
65.92 tons
83.28 tons
360.80 kg
0.00 kg
0.00 kg
total
17.45 tons
36.90 tons
43.64 tons
0.00 kg
17.66 kg
141.10 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 28/02/2021
Summary RQ
DATE Plant RQ NO Material QTY
28/2/2021 UCY BP-01 282501 CEMENT 1.97
28/2/2021 UCY BP-01 282502 SAND 3.96
28/2/2021 UCY BP-01 282503 STONE 4.86
28/2/2021 UCY BP-01 282504 O-BASF 8320 19.74
28/2/2021 UCY BP-01 282505 CEMENT 0.84
28/2/2021 UCY BP-01 282506 SAND 1.68
28/2/2021 UCY BP-01 282507 STONE 2.07
28/2/2021 UCY BP-01 282508 O-BASF 8320 8.40
28/2/2021 UCY BP-01 282509 CEMENT 1.47
28/2/2021 UCY BP-01 282510 SAND 2.68
28/2/2021 UCY BP-01 282511 STONE 3.31
28/2/2021 UCY BP-01 282512 SIKA 3006 ES 8.83
28/2/2021 UCY BP-01 282513 CEMENT 1.38
28/2/2021 UCY BP-01 282514 SAND 2.51
28/2/2021 UCY BP-01 282515 STONE 3.10
28/2/2021 UCY BP-01 282516 SIKA 3006 ES 8.28
28/2/2021 UCY BP-01 282517 CEMENT 1.72
28/2/2021 UCY BP-01 282518 SAND 3.70
28/2/2021 UCY BP-01 282519 STONE 4.41
28/2/2021 UCY BP-01 282520 O-BASF 8320 15.50
28/2/2021 UCY BP-01 282521 CEMENT 0.46
28/2/2021 UCY BP-01 282522 SAND 0.84
28/2/2021 UCY BP-01 282523 STONE 1.03
28/2/2021 UCY BP-01 282524 O-BASF 8320 4.60
28/2/2021 UCY BP-01 282525 CEMENT 0.58
28/2/2021 UCY BP-01 282526 SAND 1.45
28/2/2021 UCY BP-01 282527 STONE 1.68
28/2/2021 UCY BP-01 282528 O-BASF 8320 5.76
28/2/2021 UCY BP-01 CEMENT 1.03
28/2/2021 UCY BP-01 SAND 2.08
28/2/2021 UCY BP-01 STONE 2.61
28/2/2021 UCY BP-01 O-BASF 8320 11.28
28/2/2021 UCY BP-02 CEMENT 28.91
28/2/2021 UCY BP-02 SAND 58.23
28/2/2021 UCY BP-02 STONE 73.81
28/2/2021 UCY BP-02 SIKA 204 317.96
28/2/2021 UCY BP-01 CEMENT 32.93
28/2/2021 UCY BP-01 SAND 60.40
28/2/2021 UCY BP-01 STONE 76.53
28/2/2021 UCY BP-01 SIKA 3006 ES 169.62
28/2/2021 UCY BP-02 CEMENT 37.95
28/2/2021 UCY BP-02 SAND 68.06
28/2/2021 UCY BP-02 STONE 86.46
28/2/2021 UCY BP-02 SIKA 3006 ES 227.70

Record BY
Operator
21
SUBJOB RECORDER
33003 C3S1-ARC CEMENT 109.24 tons
33003 C3S1-ARC SAND 205.59 tons
33003 C3S1-ARC STONE 259.87 tons
33003 C3S1-ARC SIKA 204 317.96 kg
33003 C2S2-ARC SIKA 3006 ES 414.43 kg
33003 C2S2-ARC O-BASF 8320 65.28 kg
33003 C2S2-ARC SIKA LATEX POWER 0.00 kg
33003 C2S2-ARC
28001 SP-A-SUP UCY BP-01 UCY BP-02
28001 SP-A-SUP CEMENT 42.38 66.86
28001 SP-A-SUP SAND 79.30 126.29
28001 SP-A-SUP STONE 99.60 160.27
20103-TRAFFICM SIKA 204 0.00 317.96
20103-TRAFFICM SIKA 3006 ES 186.73 227.70
20103-TRAFFICM O-BASF 8320 65.28 0.00
20103-TRAFFICM SIKA LATEX POWER 0.00 0.00
24000-C3ML-SUB
24000-C3ML-SUB CP-0602
24000-C3ML-SUB
24000-C3ML-SUB UCY BP-01 UCY BP-02
S4000-C3S1 SUB CEMENT 32.93 37.95
S4000-C3S1 SUB SAND 60.40 68.06
S4000-C3S1 SUB STONE 76.53 86.46
S4000-C3S1 SUB SIKA 204 0.00 0.00
20106-TRAFFICM SIKA 3006 ES 169.62 227.70
20106-TRAFFICM O-BASF 8320 0.00 0.00
20106-TRAFFICM
20106-TRAFFICM
CP-07 CP-07
CP-07
CP-07 UCY BP-01 UCY BP-02
CP-07 CEMENT 1.03 28.91
CP-07 SAND 2.08 58.23
CP-07 STONE 2.61 73.81
CP-07 SIKA 204 0.00 317.96
CP-07 SIKA 3006 ES 0.00 0.00
CP-0602 O-BASF 8320 11.28 0.00
CP-0602
CP-0602
CP-0602 CP-03&04
CP-0602
CP-0602 UCY BP-01 UCY BP-02
CP-0602 CEMENT 8.42 0.00
CP-0602 SAND 16.82 0.00
STONE 20.46 0.00
SIKA 204 0.00 0.00
SIKA 3006 ES 17.11 0.00
O-BASF 8320 54.00 0.00
SIKA LATEX POWER 0.00 0.00

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 19.70 0 19.70
CP-07 2.5 70.50 73.00
CP-0602 73.1 82.5 155.60

total
109.24 tons
205.59 tons
259.87 tons
317.96 kg
414.43 kg
65.28 kg
0.00 kg

total
70.88 tons
128.46 tons
162.99 tons
0.00 kg
397.32 kg
0.00 kg

total
29.94 tons
60.31 tons
76.42 tons
317.96 kg
0.00 kg
11.28 kg
total
8.42 tons
16.82 tons
20.46 tons
0.00 kg
17.11 kg
54.00 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 01/03/2021
Summary RQ
DATE Plant RQ NO Material QTY
1/3/2021 UCY BP-01 282529 CEMENT 1.47
1/3/2021 UCY BP-01 282530 SAND 2.95
1/3/2021 UCY BP-01 282531 STONE 3.62
1/3/2021 UCY BP-01 282532 O-BASF 8320 14.70
1/3/2021 UCY BP-01 282533 CEMENT 1.38
1/3/2021 UCY BP-01 282534 SAND 2.51
1/3/2021 UCY BP-01 282535 STONE 3.10
1/3/2021 UCY BP-01 282536 SIKA 3006 ES 8.28
1/3/2021 UCY BP-01 282537 CEMENT 0.92
1/3/2021 UCY BP-01 282538 SAND 3.80
1/3/2021 UCY BP-01 282539 STONE 4.20
1/3/2021 UCY BP-01 282540 O-BASF 8320 9.20
1/3/2021 UCY BP-02 282541 CEMENT 25.43
1/3/2021 UCY BP-02 282542 SAND 51.32
1/3/2021 UCY BP-02 282543 STONE 62.04
1/3/2021 UCY BP-02 282544 O-BASF 8320 252.00
1/3/2021 UCY BP-02 282545 CEMENT 3.90
1/3/2021 UCY BP-02 282546 SAND 7.53
1/3/2021 UCY BP-02 282547 STONE 8.29
1/3/2021 UCY BP-02 282548 O-BASF 8320 36.80
1/3/2021 UCY BP-02 282549 CEMENT 1.47
1/3/2021 UCY BP-02 282550 SAND 2.95
1/3/2021 UCY BP-02 282551 STONE 3.62
1/3/2021 UCY BP-02 282552 O-BASF 8320 14.70
1/3/2021 UCY BP-02 282553 CEMENT 1.72
1/3/2021 UCY BP-02 282554 SAND 3.70
1/3/2021 UCY BP-02 282555 STONE 4.41
1/3/2021 UCY BP-02 282556 O-BASF 8320 15.50
1/3/2021 UCY BP-01 CEMENT 6.56
1/3/2021 UCY BP-01 SAND 13.30
1/3/2021 UCY BP-01 STONE 16.69
1/3/2021 UCY BP-01 O-BASF 8320 72.16
1/3/2021 UCY BP-02 CEMENT 29.11
1/3/2021 UCY BP-02 SAND 59.21
1/3/2021 UCY BP-02 STONE 73.77
1/3/2021 UCY BP-02 O-BASF 8320 291.10
1/3/2021 UCY BP-01 CEMENT 51.96
1/3/2021 UCY BP-01 SAND 94.52
1/3/2021 UCY BP-01 STONE 120.28
1/3/2021 UCY BP-01 SIKA 3006 ES 304.20
Record BY
Operator
21
SUBJOB RECORDER
33003-C3S3-ARC CEMENT 123.92 tons
33003-C3S3-ARC SAND 241.79 tons
33003-C3S3-ARC STONE 300.02 tons
33003-C3S3-ARC SIKA 204 0.00 kg
20103-TRAFFICM SIKA 3006 ES 312.48 kg
20103-TRAFFICM O-BASF 8320 706.16 kg
20103-TRAFFICM SIKA LATEX POWER 0.00 kg
20103-TRAFFICM
S4000-C3S3-SUB UCY BP-01 UCY BP-02
S4000-C3S3-SUB CEMENT 62.29 61.63
S4000-C3S3-SUB SAND 117.08 124.71
S4000-C3S3-SUB STONE 147.89 152.13
S4000-C3S2-SUB SIKA 204 0.00 0.00
S4000-C3S2-SUB SIKA 3006 ES 312.48 0.00
S4000-C3S2-SUB O-BASF 8320 96.06 610.10
S4000-C3S2-SUB SIKA LATEX POWER 0.00 0.00
S4000-C3S4-SUB
S4000-C3S4-SUB CP-0602
S4000-C3S4-SUB
S4000-C3S4-SUB UCY BP-01 UCY BP-02
33003-C3S2-ARC CEMENT 51.96 0.00
33003-C3S2-ARC SAND 94.52 0.00
33003-C3S2-ARC STONE 120.28 0.00
33003-C3S2-ARC SIKA 204 0.00 0.00
28003-C3ML-SUB SIKA 3006 ES 304.20 0.00
28003-C3ML-SUB O-BASF 8320 0.00 0.00
28003-C3ML-SUB
28003-C3ML-SUB
CP-07 CP-07
CP-07
CP-07 UCY BP-01 UCY BP-02
CP-07 CEMENT 6.56 29.11
CP-07 SAND 13.30 59.21
CP-07 STONE 16.69 73.77
CP-07 SIKA 204 0.00 0.00
CP-07 SIKA 3006 ES 0.00 0.00
CP-0602 O-BASF 8320 72.16 291.10
CP-0602
CP-0602
CP-0602 CP-03&04
UCY BP-01 UCY BP-02
CEMENT 3.77 32.52
SAND 9.26 65.50
STONE 10.92 78.36
SIKA 204 0.00 0.00
SIKA 3006 ES 8.28 0.00
O-BASF 8320 23.90 319.00
SIKA LATEX POWER 0.00 0.00

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 10.50 76.7 87.20
CP-07 16 71.00 87.00
CP-0602 114.6 114.60

total
123.92 tons
241.79 tons
300.02 tons
0.00 kg
312.48 kg
706.16 kg
0.00 kg

total
51.96 tons
94.52 tons
120.28 tons
0.00 kg
304.20 kg
0.00 kg

total
35.67 tons
72.51 tons
90.46 tons
0.00 kg
0.00 kg
363.26 kg
total
36.29 tons
74.76 tons
89.28 tons
0.00 kg
8.28 kg
342.90 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 02/03/2021
Summary RQ
DATE Plant RQ NO Material QTY
02/03/2021 UCY BP-01 285156 CEMENT 1.35
02/03/2021 UCY BP-01 285157 SAND 2.91
02/03/2021 UCY BP-01 285158 STONE 3.47
02/03/2021 UCY BP-01 285159 O-BASF 8320 12.18
02/03/2021 UCY BP-01 285160 CEMENT 1.66
02/03/2021 UCY BP-01 285161 SAND 3.02
02/03/2021 UCY BP-01 285162 STONE 3.72
02/03/2021 UCY BP-01 285163 SIKA 3006 ES 9.94
02/03/2021 UCY BP-01 285164 CEMENT 0.65
02/03/2021 UCY BP-01 285165 SAND 1.64
02/03/2021 UCY BP-01 285166 STONE 1.89
02/03/2021 UCY BP-01 285167 O-BASF 8320 6.48
02/03/2021 UCY BP-01 285168 CEMENT 1.38
02/03/2021 UCY BP-01 285169 SAND 2.52
02/03/2021 UCY BP-01 285170 STONE 3.10
02/03/2021 UCY BP-01 285171 O-BASF 8320 13.80
02/03/2021 UCY BP-02 285172 CEMENT 10.55
02/03/2021 UCY BP-02 285173 SAND 26.46
02/03/2021 UCY BP-02 285174 STONE 32.15
02/03/2021 UCY BP-02 285175 SIKA 204 144.55
02/03/2021 UCY BP-02 285176 CEMENT 1.93
02/03/2021 UCY BP-02 285177 SAND 4.79
02/03/2021 UCY BP-02 285178 STONE 6.00
02/03/2021 UCY BP-02 285179 SIKA 204 26.95
02/03/2021 UCY BP-02 285180 CEMENT 2.99
02/03/2021 UCY BP-02 285181 SAND 5.86
02/03/2021 UCY BP-02 285182 STONE 6.19
02/03/2021 UCY BP-02 285183 O-BASF 8320 27.60
02/03/2021 UCY BP-02 CEMENT 35.26
02/03/2021 UCY BP-02 SAND 71.29
02/03/2021 UCY BP-02 STONE 89.70
02/03/2021 UCY BP-02 O-BASF 8320 352.60
02/03/2021 UCY BP-01 CEMENT 36.81
02/03/2021 UCY BP-01 SAND 67.07
02/03/2021 UCY BP-01 STONE 85.73
02/03/2021 UCY BP-01 SIKA 3006 ES 213.60
Record BY
Operator
21
SUBJOB RECORDER
28003-C3ML-SUB CEMENT 92.58 tons
28003-C3ML-SUB SAND 185.56 tons
28003-C3ML-SUB STONE 231.95 tons
28003-C3ML-SUB SIKA 204 171.50 kg
20103-TRAFFICM SIKA 3006 ES 223.54 kg
20103-TRAFFICM O-BASF 8320 412.66 kg
20103-TRAFFICM SIKA LATEX POWER 0.00 kg
20103-TRAFFICM
20106-TRAFFICM UCY BP-01 UCY BP-02
20106-TRAFFICM CEMENT 41.85 50.73
20106-TRAFFICM SAND 77.16 108.40
20106-TRAFFICM STONE 97.91 134.04
S4000-C3S2-SUB SIKA 204 0.00 171.50
S4000-C3S2-SUB SIKA 3006 ES 223.54 0.00
S4000-C3S2-SUB O-BASF 8320 32.46 380.20
S4000-C3S2-SUB SIKA LATEX POWER 0.00 0.00
31002-C3S1-ARC
31002-C3S1-ARC CP-0602
31002-C3S1-ARC
31002-C3S1-ARC UCY BP-01 UCY BP-02
31002-C3S4-ARC CEMENT 36.81 0.00
31002-C3S4-ARC SAND 67.07 0.00
31002-C3S4-ARC STONE 85.73 0.00
31002-C3S4-ARC SIKA 204 0.00 0.00
S4000-C3S4-SUB SIKA 3006 ES 213.60 0.00
S4000-C3S4-SUB O-BASF 8320 0.00 0.00
S4000-C3S4-SUB
S4000-C3S4-SUB
CP-07 CP-07
CP-07
CP-07 UCY BP-01 UCY BP-02
CP-07 CEMENT 0.00 35.26
CP-0602 SAND 0.00 71.29
CP-0602 STONE 0.00 89.70
CP-0602 SIKA 204 0.00 0.00
CP-0602 SIKA 3006 ES 0.00 0.00
O-BASF 8320 0.00 352.60

CP-03&04
UCY BP-01 UCY BP-02
CEMENT 5.04 15.47
SAND 10.09 37.11
STONE 12.18 44.34
SIKA 204 0.00 171.50
SIKA 3006 ES 9.94 0.00
O-BASF 8320 32.46 27.60
SIKA LATEX POWER 0.00 0.00

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 0.00 42 42.00
CP-07 0 86.00 86.00
CP-0602 81.6 0 81.60

total
92.58 tons
185.56 tons
231.95 tons
171.50 kg
223.54 kg
412.66 kg
0.00 kg

total
36.81 tons
67.07 tons
85.73 tons
0.00 kg
213.60 kg
0.00 kg

total
35.26 tons
71.29 tons
89.70 tons
0.00 kg
0.00 kg
352.60 kg
total
20.51 tons
47.20 tons
56.52 tons
171.50 kg
9.94 kg
60.06 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 03/03/2021
Summary RQ
DATE Plant RQ NO Material QTY
3/3/2021 UCY BP-01 282584 CEMENT 0.69
3/3/2021 UCY BP-01 282585 SAND 1.26
3/3/2021 UCY BP-01 282586 STONE 1.55
3/3/2021 UCY BP-01 282587 O-BASF 8320 6.90
3/3/2021 UCY BP-01 282588 CEMENT 1.38
3/3/2021 UCY BP-01 282589 SAND 2.51
3/3/2021 UCY BP-01 282590 STONE 3.10
3/3/2021 UCY BP-01 282591 SIKA 3006 ES 8.28
3/3/2021 UCY BP-01 282592 CEMENT 0.46
3/3/2021 UCY BP-01 282593 SAND 0.84
3/3/2021 UCY BP-01 282594 STONE 1.03
3/3/2021 UCY BP-01 282595 SIKA 3006 ES 2.76
3/3/2021 UCY BP-01 282596 CEMENT 1.96
3/3/2021 UCY BP-01 282597 SAND 8.07
3/3/2021 UCY BP-01 282598 STONE 8.92
3/3/2021 UCY BP-01 282599 O-BASF 8320 19.55
3/3/2021 UCY BP-01 282600 CEMENT 1.38
3/3/2021 UCY BP-01 282601 SAND 5.69
3/3/2021 UCY BP-01 282602 STONE 6.29
3/3/2021 UCY BP-01 282603 O-BASF 8320 13.80
3/3/2021 UCY BP-02 282604 CEMENT 1.72
3/3/2021 UCY BP-02 282605 SAND 3.70
3/3/2021 UCY BP-02 282606 STONE 4.41
3/3/2021 UCY BP-02 282607 O-BASF 8320 15.50
3/3/2021 UCY BP-01 CEMENT 2.46
3/3/2021 UCY BP-01 SAND 4.97
3/3/2021 UCY BP-01 STONE 6.27
3/3/2021 UCY BP-01 O-BASF 8320 27.06
3/3/2021 UCY BP-02 CEMENT 37.93
3/3/2021 UCY BP-02 SAND 76.59
3/3/2021 UCY BP-02 STONE 96.66
3/3/2021 UCY BP-02 O-BASF 8320 379.25
3/3/2021 UCY BP-01 CEMENT 59.16
3/3/2021 UCY BP-01 SAND 106.67
3/3/2021 UCY BP-01 STONE 187.44
3/3/2021 UCY BP-01 SIKA 3006 ES 347.64
Record BY
Operator
21
SUBJOB RECORDER
S4000-C3S3-SUB CEMENT 107.14 tons
S4000-C3S3-SUB SAND 210.30 tons
S4000-C3S3-SUB STONE 315.67 tons
S4000-C3S3-SUB SIKA 204 0.00 kg
20103-RTAFFICM SIKA 3006 ES 358.68 kg
20103-RTAFFICM O-BASF 8320 462.06 kg
20103-RTAFFICM SIKA LATEX POWER 0.00 kg
20103-RTAFFICM
28001-SP-A-SUP UCY BP-01 UCY BP-02
28001-SP-A-SUP CEMENT 67.49 39.65
28001-SP-A-SUP SAND 130.01 80.29
28001-SP-A-SUP STONE 214.60 101.07
S4000-C3S3-SUB SIKA 204 0.00 0.00
S4000-C3S3-SUB SIKA 3006 ES 358.68 0.00
S4000-C3S3-SUB O-BASF 8320 67.31 394.75
S4000-C3S3-SUB SIKA LATEX POWER 0.00 0.00
S4000-C3S1-SUB
S4000-C3S1-SUB CP-0602
S4000-C3S1-SUB
S4000-C3S1-SUB UCY BP-01 UCY BP-02
28003-C3ML-SUB CEMENT 59.16 0.00
28003-C3ML-SUB SAND 106.67 0.00
28003-C3ML-SUB STONE 187.44 0.00
28003-C3ML-SUB SIKA 204 0.00 0.00
CP-07 SIKA 3006 ES 347.64 0.00
CP-07 O-BASF 8320 0.00 0.00
CP-07
CP-07
CP-07 CP-07
CP-07
CP-07 UCY BP-01 UCY BP-02
CP-07 CEMENT 2.46 37.93
CP-0602 SAND 4.97 76.59
CP-0602 STONE 6.27 96.66
CP-0602 SIKA 204 0.00 0.00
CP-0602 SIKA 3006 ES 0.00 0.00
O-BASF 8320 27.06 379.25

CP-03&04
UCY BP-01 UCY BP-02
CEMENT 5.87 1.72
SAND 18.37 3.70
STONE 20.89 4.41
SIKA 204 0.00 0.00
SIKA 3006 ES 11.04 0.00
O-BASF 8320 40.25 15.50
SIKA LATEX POWER 0.00 0.00

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 20.00 4.2 24.20
CP-07 6 92.50 98.50
CP-0602 130.2 0 130.20

total
107.14 tons
210.30 tons
315.67 tons
0.00 kg
358.68 kg
462.06 kg
0.00 kg

total
59.16 tons
106.67 tons
187.44 tons
0.00 kg
347.64 kg
0.00 kg

total
40.39 tons
81.56 tons
102.93 tons
0.00 kg
0.00 kg
406.31 kg
total
7.59 tons
22.07 tons
25.30 tons
0.00 kg
11.04 kg
55.75 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 04/03/2021
Summary RQ
DATE Plant RQ NO Material QTY
3/4/2021 UCY BP-01 282608 CEMENT 1.15
3/4/2021 UCY BP-01 282609 SAND 2.10
3/4/2021 UCY BP-01 282610 STONE 2.59
3/4/2021 UCY BP-01 282611 O-BASF 8320 11.50
3/4/2021 UCY BP-01 282612 CEMENT 1.38
3/4/2021 UCY BP-01 282613 SAND 2.52
3/4/2021 UCY BP-01 282614 STONE 3.10
3/4/2021 UCY BP-01 282615 SIKA 3006 ES 8.28
3/4/2021 UCY BP-01 282616 CEMENT 1.52
3/4/2021 UCY BP-01 282617 SAND 2.79
3/4/2021 UCY BP-01 282618 STONE 3.41
3/4/2021 UCY BP-01 282619 SIKA 3006 ES 9.11
3/4/2021 UCY BP-01 282620 CEMENT 0.25
3/4/2021 UCY BP-01 282621 SAND 0.79
3/4/2021 UCY BP-01 282622 CEMENT 0.50
3/4/2021 UCY BP-01 282623 SAND 1.27
3/4/2021 UCY BP-01 282624 STONE 1.47
3/4/2021 UCY BP-01 282625 O-BASF 8320 5.04
3/4/2021 UCY BP-02 282626 CEMENT 8.42
3/4/2021 UCY BP-02 282627 SAND 17.24
3/4/2021 UCY BP-02 282628 STONE 20.16
3/4/2021 UCY BP-02 282629 O-BASF 8320 81.90
3/4/2021 UCY BP-02 282630 CEMENT 2.07
3/4/2021 UCY BP-02 282631 SAND 4.16
3/4/2021 UCY BP-02 282632 STONE 4.14
3/4/2021 UCY BP-02 282633 O-BASF 8320 18.40
3/4/2021 UCY BP-02 282634 CEMENT 0.58
3/4/2021 UCY BP-02 282635 SAND 2.37
3/4/2021 UCY BP-02 282636 STONE 2.63
3/4/2021 UCY BP-02 282637 O-BASF 8320 5.75
3/4/2021 UCY BP-02 282638 CEMENT 0.92
3/4/2021 UCY BP-02 282639 SAND 3.80
3/4/2021 UCY BP-02 282640 STONE 4.20
3/4/2021 UCY BP-02 282641 O-BASF 8320 9.20
3/4/2021 UCY BP-02 282642 CEMENT 1.72
3/4/2021 UCY BP-02 282643 SAND 3.70
3/4/2021 UCY BP-02 282644 STONE 4.41
3/4/2021 UCY BP-02 282645 O-BASF 8320 15.50
3/4/2021 UCY BP-02 282646 CEMENT 0.46
3/4/2021 UCY BP-02 282647 SAND 0.84
3/4/2021 UCY BP-02 282648 STONE 1.04
3/4/2021 UCY BP-02 282649 O-BASF 8320 4.60
3/4/2021 UCY BP-02 282650 CEMENT 1.26
3/4/2021 UCY BP-02 282651 SAND 2.53
3/4/2021 UCY BP-02 282652 STONE 3.10
3/4/2021 UCY BP-02 282653 O-BASF 8320 12.60
3/4/2021 UCY BP-02 282654 CEMENT 0.21
3/4/2021 UCY BP-02 282655 SAND 0.42
3/4/2021 UCY BP-02 282656 STONE 0.52
3/4/2021 UCY BP-02 282657 O-BASF 8320 2.10
3/4/2021 UCY BP-02 282658 CEMENT 0.84
3/4/2021 UCY BP-02 282659 SAND 1.69
3/4/2021 UCY BP-02 282660 STONE 2.07
3/4/2021 UCY BP-02 282661 O-BASF 8320 8.40
3/4/2021 UCY BP-01 CEMENT 8.82
3/4/2021 UCY BP-01 SAND 17.87
3/4/2021 UCY BP-01 STONE 22.47
3/4/2021 UCY BP-01 O-BASF 8320 96.97
3/4/2021 UCY BP-02 CEMENT 16.40
3/4/2021 UCY BP-02 SAND 33.20
3/4/2021 UCY BP-02 STONE 41.76
3/4/2021 UCY BP-02 O-BASF 8320 164.00
3/4/2021 UCY BP-01 CEMENT 24.43
3/4/2021 UCY BP-01 SAND 44.96
3/4/2021 UCY BP-01 STONE 57.50
3/4/2021 UCY BP-01 SIKA 3006 ES 139.26

Record BY
Operator
21
SUBJOB RECORDER
S4000-C3S2-SUB CEMENT 70.93 tons
S4000-C3S2-SUB SAND 142.25 tons
S4000-C3S2-SUB STONE 174.57 tons
S4000-C3S2-SUB SIKA 204 0.00 kg
20103-TRAFFICM SIKA 3006 ES 156.65 kg
20103-TRAFFICM O-BASF 8320 435.96 kg
20103-TRAFFICM SIKA LATEX POWER 0.00 kg
20103-TRAFFICM
28001-SP-A-SUP UCY BP-01 UCY BP-02
28001-SP-A-SUP CEMENT 38.05 32.88
28001-SP-A-SUP SAND 72.30 69.95
28001-SP-A-SUP STONE 90.54 84.03
S4000-C3S2-SUB SIKA 204 0.00 0.00
S4000-C3S2-SUB SIKA 3006 ES 156.65 0.00
20106-TRAFFICM O-BASF 8320 113.51 322.45
20106-TRAFFICM SIKA LATEX POWER 0.00 0.00
20106-TRAFFICM
20106-TRAFFICM CP-0602
S4000-C3S1-SUB
S4000-C3S1-SUB UCY BP-01 UCY BP-02
S4000-C3S1-SUB CEMENT 24.43 0.00
S4000-C3S1-SUB SAND 44.96 0.00
S4000-C3S4-SUB STONE 57.50 0.00
S4000-C3S4-SUB SIKA 204 0.00 0.00
S4000-C3S4-SUB SIKA 3006 ES 139.26 0.00
S4000-C3S4-SUB O-BASF 8320 0.00 0.00
S4000-C3S4-SUB
S4000-C3S4-SUB
S4000-C3S4-SUB CP-07
S4000-C3S4-SUB
S4000-C3S3-SUB UCY BP-01 UCY BP-02
S4000-C3S3-SUB CEMENT 8.82 16.40
S4000-C3S3-SUB SAND 17.87 33.20
S4000-C3S3-SUB STONE 22.47 41.76
28003-C3ML-SUB SIKA 204 0.00 0.00
28003-C3ML-SUB SIKA 3006 ES 0.00 0.00
28003-C3ML-SUB O-BASF 8320 96.97 164.00
28003-C3ML-SUB
28006-C3ML-SUB
28006-C3ML-SUB CP-03&04
28006-C3ML-SUB
28006-C3ML-SUB UCY BP-01 UCY BP-02
33003-C3S2-ARC CEMENT 4.80 16.48
33003-C3S2-ARC SAND 9.47 36.75
33003-C3S2-ARC STONE 10.57 42.27
33003-C3S2-ARC SIKA 204 0.00 0.00
S4000-C3S2-SUB SIKA 3006 ES 17.39 0.00
S4000-C3S2-SUB O-BASF 8320 16.54 158.45
S4000-C3S2-SUB SIKA LATEX POWER 0.00 0.00
S4000-C3S2-SUB
S4000-C3S1-SUB
S4000-C3S1-SUB
S4000-C3S1-SUB
S4000-C3S1-SUB
CP-07
CP-07
CP-07
CP-07
CP-07
CP-07
CP-07
CP-07
CP-0602
CP-0602
CP-0602
CP-0602

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 10.70 41.7 52.40
CP-07 21.5 40.00 61.50
CP-0602 54.7 0 54.70

total
70.93 tons
142.25 tons
174.57 tons
0.00 kg
156.65 kg
435.96 kg
0.00 kg

total
24.43 tons
44.96 tons
57.50 tons
0.00 kg
139.26 kg
0.00 kg

total
25.22 tons
51.07 tons
64.23 tons
0.00 kg
0.00 kg
260.97 kg
total
21.28 tons
46.22 tons
52.84 tons
0.00 kg
17.39 kg
174.99 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 05/03/2021
Summary RQ
DATE Plant RQ NO Material QTY
3/5/2021 UCY BP-01 282662 CEMENT 1.04
3/5/2021 UCY BP-01 282663 SAND 4.27
3/5/2021 UCY BP-01 282664 STONE 4.72
3/5/2021 UCY BP-01 282665 O-BASF 8320 10.35
3/5/2021 UCY BP-01 282666 CEMENT 0.92
3/5/2021 UCY BP-01 282667 SAND 3.80
3/5/2021 UCY BP-01 282668 STONE 4.20
3/5/2021 UCY BP-01 282669 O-BASF 8320 9.20
3/5/2021 UCY BP-01 282670 CEMENT 1.38
3/5/2021 UCY BP-01 282671 SAND 2.51
3/5/2021 UCY BP-01 282672 STONE 3.10
3/5/2021 UCY BP-01 282673 SIKA 3006 ES 8.28
3/5/2021 UCY BP-01 282674 CEMENT 1.84
3/5/2021 UCY BP-01 282675 SAND 3.35
3/5/2021 UCY BP-01 282676 STONE 4.13
3/5/2021 UCY BP-01 282677 O-BASF 8320 18.40
3/5/2021 UCY BP-02 282678 CEMENT 1.47
3/5/2021 UCY BP-02 282679 SAND 2.95
3/5/2021 UCY BP-02 282680 STONE 3.62
3/5/2021 UCY BP-02 282681 O-BASF 8320 14.70
3/5/2021 UCY BP-02 282682 CEMENT 1.72
3/5/2021 UCY BP-02 282683 SAND 3.70
3/5/2021 UCY BP-02 282684 STONE 4.41
3/5/2021 UCY BP-02 282685 O-BASF 8320 15.50
3/5/2021 UCY BP-01 - CEMENT 40.32
3/5/2021 UCY BP-01 - SAND 73.23
3/5/2021 UCY BP-01 - STONE 33.19
3/5/2021 UCY BP-01 - SIKA 3006 ES 236.64
3/5/2021 UCY BP-02 - CEMENT 22.54
3/5/2021 UCY BP-02 - SAND 40.38
3/5/2021 UCY BP-02 - STONE 51.45
3/5/2021 UCY BP-02 - SIKA 3006 ES 135.24
Record BY
Operator
21
SUBJOB RECORDER
S4000-C3S2-SUB CEMENT 71.23 tons
S4000-C3S2-SUB SAND 134.19 tons
S4000-C3S2-SUB STONE 108.82 tons
S4000-C3S2-SUB SIKA 204 0.00 kg
S4000-C3S3-SUB SIKA 3006 ES 380.16 kg
S4000-C3S3-SUB O-BASF 8320 68.15 kg
S4000-C3S3-SUB SIKA LATEX POWER 0.00 kg
S4000-C3S3-SUB
20103-TRAFFICM UCY BP-01 UCY BP-02
20103-TRAFFICM CEMENT 45.50 25.73
20103-TRAFFICM SAND 87.16 47.03
20103-TRAFFICM STONE 49.34 59.48
26101-C3ML-SUB SIKA 204 0.00 0.00
26101-C3ML-SUB SIKA 3006 ES 244.92 135.24
26101-C3ML-SUB O-BASF 8320 37.95 30.20
26101-C3ML-SUB SIKA LATEX POWER 0.00 0.00
33003-C3S1-ARC
33003-C3S1-ARC CP-0602
33003-C3S1-ARC
33003-C3S1-ARC UCY BP-01 UCY BP-02
28003-C3ML-SUB CEMENT 40.32 22.54
28003-C3ML-SUB SAND 73.23 40.38
28003-C3ML-SUB STONE 33.19 51.45
28003-C3ML-SUB SIKA 204 0.00 0.00
CP-0602 SIKA 3006 ES 236.64 135.24
CP-0602 O-BASF 8320 0.00 0.00
CP-0602
CP-0602
CP-0602 CP-07
CP-0602
CP-0602 UCY BP-01 UCY BP-02
CP-0602 CEMENT 0.00 0.00
SAND 0.00 0.00
STONE 0.00 0.00
SIKA 204 0.00 0.00
SIKA 3006 ES 0.00 0.00
O-BASF 8320 0.00 0.00

CP-03&04
UCY BP-01 UCY BP-02
CEMENT 5.18 3.19
SAND 13.93 6.65
STONE 16.15 8.03
SIKA 204 0.00 0.00
SIKA 3006 ES 8.28 0.00
O-BASF 8320 37.95 30.20
SIKA LATEX POWER 0.00 0.00

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 15.50 7.7 23.20
CP-07 0 0.00 0.00
CP-0602 88.8 49 137.80

total
71.23 tons
134.19 tons
108.82 tons
0.00 kg
380.16 kg
68.15 kg
0.00 kg

total
62.86 tons
113.61 tons
84.64 tons
0.00 kg
371.88 kg
0.00 kg

total
0.00 tons
0.00 tons
0.00 tons
0.00 kg
0.00 kg
0.00 kg
total
8.37 tons
20.58 tons
24.18 tons
0.00 kg
8.28 kg
68.15 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 06/03/2021
Summary RQ
DATE Plant RQ NO Material QTY
06/03/2021 UCY BP-01 282686 CEMENT 0.21
06/03/2021 UCY BP-01 282687 SAND 0.42
06/03/2021 UCY BP-01 282688 STONE 0.52
06/03/2021 UCY BP-01 282689 O-BASF 8320 2.10
06/03/2021 UCY BP-01 282690 CEMENT 0.43
06/03/2021 UCY BP-01 282691 SAND 1.09
06/03/2021 UCY BP-01 282692 STONE 1.26
06/03/2021 UCY BP-01 282693 O-BASF 8320 4.32
06/03/2021 UCY BP-01 282694 CEMENT 1.72
06/03/2021 UCY BP-01 282695 SAND 3.70
06/03/2021 UCY BP-01 282696 STONE 4.41
06/03/2021 UCY BP-01 282697 O-BASF 8320 15.50
06/03/2021 UCY BP-01 282698 CEMENT 1.38
06/03/2021 UCY BP-01 282699 SAND 2.52
06/03/2021 UCY BP-01 282700 STONE 3.10
06/03/2021 UCY BP-01 282701 SIKA 3006 ES 8.28
06/03/2021 UCY BP-01 282702 CEMENT 1.61
06/03/2021 UCY BP-01 282703 SAND 2.94
06/03/2021 UCY BP-01 282704 STONE 3.62
06/03/2021 UCY BP-01 282705 SIKA 3006 ES 9.66
06/03/2021 UCY BP-02 282706 CEMENT 2.44
06/03/2021 UCY BP-02 282707 SAND 4.45
06/03/2021 UCY BP-02 282708 STONE 5.48
06/03/2021 UCY BP-02 282709 SIKA 3006 ES 14.63
06/03/2021 UCY BP-02 282710 CEMENT 8.63
06/03/2021 UCY BP-02 282711 SAND 21.66
06/03/2021 UCY BP-02 282712 STONE 26.16
06/03/2021 UCY BP-02 282713 SIKA 204 117.60
06/03/2021 UCY BP-02 282714 CEMENT 1.04
06/03/2021 UCY BP-02 282715 SAND 4.28
06/03/2021 UCY BP-02 282716 STONE 4.73
06/03/2021 UCY BP-02 282717 O-BASF 8320 10.35
06/03/2021 UCY BP-02 282718 CEMENT 2.53
06/03/2021 UCY BP-02 282719 SAND 4.62
06/03/2021 UCY BP-02 282720 STONE 5.69
06/03/2021 UCY BP-02 282721 O-BASF 8320 25.30
06/03/2021 UCY BP-01 CEMENT 7.18
06/03/2021 UCY BP-01 SAND 14.56
06/03/2021 UCY BP-01 STONE 18.25
06/03/2021 UCY BP-01 O-BASF 8320 71.75
06/03/2021 UCY BP-02 CEMENT 49.59
06/03/2021 UCY BP-02 SAND 88.29
06/03/2021 UCY BP-02 STONE 113.62
06/03/2021 UCY BP-02 SIKA 3006 ES 297.53

Record BY
Operator
21
SUBJOB RECORDER
S4000-C3S2-SUB CEMENT 76.76 tons
S4000-C3S2-SUB SAND 148.53 tons
S4000-C3S2-SUB STONE 186.84 tons
S4000-C3S2-SUB SIKA 204 117.60 kg
20106-TRAFFICM SIKA 3006 ES 330.10 kg
20106-TRAFFICM O-BASF 8320 129.32 kg
20106-TRAFFICM SIKA LATEX POWER 0.00 kg
20106-TRAFFICM
28003-C3ML-SUB UCY BP-01 UCY BP-02
28003-C3ML-SUB CEMENT 12.53 64.23
28003-C3ML-SUB SAND 25.23 123.30
28003-C3ML-SUB STONE 31.16 155.68
20103-TRAFFICM SIKA 204 0.00 117.60
20103-TRAFFICM SIKA 3006 ES 17.94 312.16
20103-TRAFFICM O-BASF 8320 93.67 35.65
20103-TRAFFICM SIKA LATEX POWER 0.00 0.00
28001-SP-A-SUP
28001-SP-A-SUP CP-0602
28001-SP-A-SUP
28001-SP-A-SUP UCY BP-01 UCY BP-02
20103-TRAFFICM CEMENT 0.00 49.59
20103-TRAFFICM SAND 0.00 88.29
20103-TRAFFICM STONE 0.00 113.62
20103-TRAFFICM SIKA 204 0.00 0.00
31002-C3S5-ARC SIKA 3006 ES 0.00 297.53
31002-C3S5-ARC O-BASF 8320 0.00 0.00
31002-C3S5-ARC
31002-C3S5-ARC
S4000-C3S2-SUB CP-07
S4000-C3S2-SUB
S4000-C3S2-SUB UCY BP-01 UCY BP-02
S4000-C3S2-SUB CEMENT 7.18 0.00
26101-C3ML-SUB SAND 14.56 0.00
26101-C3ML-SUB STONE 18.25 0.00
26101-C3ML-SUB SIKA 204 0.00 0.00
26101-C3ML-SUB SIKA 3006 ES 0.00 0.00
CP-07 O-BASF 8320 71.75 0.00
CP-07
CP-07
CP-07 CP-03&04
CP-0602
CP-0602 UCY BP-01 UCY BP-02
CP-0602 CEMENT 5.35 14.64
CP-0602 SAND 10.67 35.01
STONE 12.91 42.06
SIKA 204 0.00 117.60
SIKA 3006 ES 17.94 14.63
O-BASF 8320 21.92 35.65
SIKA LATEX POWER 0.00 0.00

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 12.40 0 12.40
CP-07 17.5 0.00 17.50
CP-0602 0 107.8 107.80

total
76.76 tons
148.53 tons
186.84 tons
117.60 kg
330.10 kg
129.32 kg
0.00 kg

total
49.59 tons
88.29 tons
113.62 tons
0.00 kg
297.53 kg
0.00 kg

total
7.18 tons
14.56 tons
18.25 tons
0.00 kg
0.00 kg
71.75 kg
total
19.99 tons
45.68 tons
54.97 tons
117.60 kg
32.57 kg
57.57 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 07/03/2021
Summary RQ
DATE Plant RQ NO Material QTY
07/03/2021 UCY BP-01 282722 CEMENT 0.23
07/03/2021 UCY BP-01 282723 SAND 0.80
07/03/2021 UCY BP-01 282724 CEMENT 21.00
07/03/2021 UCY BP-01 282725 SAND 51.90
07/03/2021 UCY BP-01 282726 STONE 65.28
07/03/2021 UCY BP-01 282727 O-BASF 8320 294.00
07/03/2021 UCY BP-01 282728 SIKA LATEX POWER 420.00
07/03/2021 UCY BP-02 282729 CEMENT 6.71
07/03/2021 UCY BP-02 282730 SAND 12.20
07/03/2021 UCY BP-02 282731 STONE 15.10
07/03/2021 UCY BP-02 282732 SIKA 3006 ES 40.29
07/03/2021 UCY BP-02 282733 CEMENT 3.82
07/03/2021 UCY BP-02 282734 SAND 6.94
07/03/2021 UCY BP-02 282735 STONE 8.58
07/03/2021 UCY BP-02 282736 SIKA 3006 ES 22.91
07/03/2021 UCY BP-02 282737 CEMENT 1.72
07/03/2021 UCY BP-02 282738 SAND 3.69
07/03/2021 UCY BP-02 282739 STONE 4.41
07/03/2021 UCY BP-02 282740 O-BASF 8320 15.50
07/03/2021 UCY BP-02 282741 CEMENT 1.19
07/03/2021 UCY BP-02 282742 SAND 2.99
07/03/2021 UCY BP-02 282743 STONE 3.47
07/03/2021 UCY BP-02 282744 O-BASF 8320 11.88
07/03/2021 UCY BP-02 282745 CEMENT 1.75
07/03/2021 UCY BP-02 282746 SAND 4.33
07/03/2021 UCY BP-02 282747 STONE 5.44
07/03/2021 UCY BP-02 282748 SIKA 204 24.50
07/03/2021 UCY BP-02 282749 CEMENT 1.15
07/03/2021 UCY BP-02 282750 SAND 2.10
07/03/2021 UCY BP-02 282751 STONE 2.59
07/03/2021 UCY BP-02 282752 O-BASF 8320 11.50
07/03/2021 UCY BP-02 282753 CEMENT 1.61
07/03/2021 UCY BP-02 282754 SAND 2.94
07/03/2021 UCY BP-02 282755 STONE 3.62
07/03/2021 UCY BP-02 282756 O-BASF 8320 16.10
07/03/2021 UCY BP-02 CEMENT 28.50
07/03/2021 UCY BP-02 SAND 57.96
07/03/2021 UCY BP-02 STONE 72.77
07/03/2021 UCY BP-02 O-BASF 8320 284.95
07/03/2021 UCY BP-01 CEMENT 52.21
07/03/2021 UCY BP-01 SAND 92.73
07/03/2021 UCY BP-01 STONE 119.63
07/03/2021 UCY BP-01 SIKA 3006 ES 313.26

Record BY
Operator
21
SUBJOB RECORDER
31002-C4S5-ARC CEMENT 119.89 tons
31002-C4S5-ARC SAND 238.58 tons
S4000-C4S5-SUB STONE 300.89 tons
S4000-C4S5-SUB SIKA 204 24.50 kg
S4000-C4S5-SUB SIKA 3006 ES 376.46 kg
S4000-C4S5-SUB O-BASF 8320 633.93 kg
S4000-C4S5-SUB SIKA LATEX POWER 420.00 kg
28001-SP-A-SUP
28001-SP-A-SUP UCY BP-01 UCY BP-02
28001-SP-A-SUP CEMENT 73.44 46.45
28001-SP-A-SUP SAND 145.43 93.15
20103-TRAFFICM STONE 184.91 115.98
20103-TRAFFICM SIKA 204 0.00 24.50
20103-TRAFFICM SIKA 3006 ES 313.26 63.20
20103-TRAFFICM O-BASF 8320 294.00 339.93
28003-C3ML-SUB SIKA LATEX POWER 420.00 0.00
28003-C3ML-SUB
28003-C3ML-SUB CP-0602
28003-C3ML-SUB
20106-TRAFFICM UCY BP-01 UCY BP-02
20106-TRAFFICM CEMENT 52.21 0.00
20106-TRAFFICM SAND 92.73 0.00
20106-TRAFFICM STONE 119.63 0.00
31002-C4S5-ARC SIKA 204 0.00 0.00
31002-C4S5-ARC SIKA 3006 ES 313.26 0.00
31002-C4S5-ARC O-BASF 8320 0.00 0.00
31002-C4S5-ARC
28006-C3ML-SUB
28006-C3ML-SUB CP-07
28006-C3ML-SUB
28006-C3ML-SUB UCY BP-01 UCY BP-02
26101-C3ML-SUB CEMENT 0.00 28.50
26101-C3ML-SUB SAND 0.00 57.96
26101-C3ML-SUB STONE 0.00 72.77
26101-C3ML-SUB SIKA 204 0.00 0.00
CP-07 SIKA 3006 ES 0.00 0.00
CP-07 O-BASF 8320 0.00 284.95
CP-07
CP-07
CP-0602 CP-03&04
CP-0602
CP-0602 UCY BP-01 UCY BP-02
CP-0602 CEMENT 21.23 17.95
SAND 52.70 35.19
STONE 65.28 43.21
SIKA 204 0.00 24.50
SIKA 3006 ES 0.00 63.20
O-BASF 8320 294.00 54.98
SIKA LATEX POWER 420.00 0.00

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 0.00 41.4 41.40
CP-07 0 69.50 69.50
CP-0602 113.5 0 113.50

total
119.89 tons
238.58 tons
300.89 tons
24.50 kg
376.46 kg
633.93 kg
420.00 kg

total
52.21 tons
92.73 tons
119.63 tons
0.00 kg
313.26 kg
0.00 kg

total
28.50 tons
57.96 tons
72.77 tons
0.00 kg
0.00 kg
284.95 kg
total
39.18 tons
87.89 tons
108.49 tons
24.50 kg
63.20 kg
348.98 kg
420.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 08/03/2021
Summary RQ
DATE Plant RQ NO Material QTY
08/03/2021 UCY BP-01 282757 CEMENT 26.65
08/03/2021 UCY BP-01 282758 SAND 54.79
08/03/2021 UCY BP-01 282759 STONE 67.21
08/03/2021 UCY BP-01 282760 O-BASF 8320 273.00
08/03/2021 UCY BP-02 282761 CEMENT 6.07
08/03/2021 UCY BP-02 282762 SAND 11.02
08/03/2021 UCY BP-02 282763 STONE 13.65
08/03/2021 UCY BP-02 282764 SIKA 3006 ES 36.43
08/03/2021 UCY BP-02 282765 CEMENT 3.82
08/03/2021 UCY BP-02 282766 SAND 6.93
08/03/2021 UCY BP-02 282767 STONE 8.58
08/03/2021 UCY BP-02 282768 SIKA 3006 ES 22.91
08/03/2021 UCY BP-02 282769 CEMENT 1.72
08/03/2021 UCY BP-02 282770 SAND 3.68
08/03/2021 UCY BP-02 282771 STONE 4.41
08/03/2021 UCY BP-02 282772 O-BASF 8320 15.50
08/03/2021 UCY BP-02 282773 CEMENT 0.46
08/03/2021 UCY BP-02 282774 SAND 0.84
08/03/2021 UCY BP-02 282775 STONE 1.03
08/03/2021 UCY BP-02 282776 O-BASF 8320 4.60
08/03/2021 UCY BP-02 282777 CEMENT 0.92
08/03/2021 UCY BP-02 282778 SAND 1.67
08/03/2021 UCY BP-02 282779 STONE 2.07
08/03/2021 UCY BP-02 282780 O-BASF 8320 9.20
08/03/2021 UCY BP-02 282781 CEMENT 1.38
08/03/2021 UCY BP-02 282782 SAND 5.67
08/03/2021 UCY BP-02 282783 STONE 6.31
08/03/2021 UCY BP-02 282784 O-BASF 8320 13.80
08/03/2021 UCY BP-02 282785 CEMENT 1.68
08/03/2021 UCY BP-02 282786 SAND 3.37
08/03/2021 UCY BP-02 282787 STONE 4.14
08/03/2021 UCY BP-02 282788 O-BASF 8320 16.80
08/03/2021 UCY BP-02 282789 CEMENT 70.98
08/03/2021 UCY BP-02 282790 SAND 142.47
08/03/2021 UCY BP-02 282791 STONE 174.74
08/03/2021 UCY BP-02 282792 O-BASF 8320 709.80
08/03/2021 UCY BP-01 CEMENT 34.24
08/03/2021 UCY BP-01 SAND 69.47
08/03/2021 UCY BP-01 STONE 87.42
08/03/2021 UCY BP-01 O-BASF 8320 376.59
08/03/2021 UCY BP-02 CEMENT 8.41
08/03/2021 UCY BP-02 SAND 16.85
08/03/2021 UCY BP-02 STONE 21.36
08/03/2021 UCY BP-02 O-BASF 8320 84.05
08/03/2021 UCY BP-01 CEMENT 14.72
08/03/2021 UCY BP-01 SAND 26.21
08/03/2021 UCY BP-01 STONE 37.73
08/03/2021 UCY BP-01 SIKA 3006 ES 88.32
08/03/2021 UCY BP-02 CEMENT 31.05
08/03/2021 UCY BP-02 SAND 55.28
08/03/2021 UCY BP-02 STONE 71.42
08/03/2021 UCY BP-02 SIKA 3006 ES 186.30

Record BY
Operator
21
SUBJOB RECORDER
S4000-C4S7-SUB CEMENT 202.10 tons
S4000-C4S7-SUB SAND 398.25 tons
S4000-C4S7-SUB STONE 500.07 tons
S4000-C4S7-SUB SIKA 204 0.00 kg
28001-SP-A-SUP SIKA 3006 ES 333.96 kg
28001-SP-A-SUP O-BASF 8320 1503.34 kg
28001-SP-A-SUP SIKA LATEX POWER 0.00 kg
28001-SP-A-SUP
20103-TRAFFICM UCY BP-01 UCY BP-02
20103-TRAFFICM CEMENT 75.61 126.49
20103-TRAFFICM SAND 150.47 247.78
20103-TRAFFICM STONE 192.36 307.71
28003-C3ML-SUB SIKA 204 0.00 0.00
28003-C3ML-SUB SIKA 3006 ES 88.32 245.64
28003-C3ML-SUB O-BASF 8320 649.59 853.75
28003-C3ML-SUB SIKA LATEX POWER 0.00 0.00
26101-C3ML-SUB
26101-C3ML-SUB CP-0602
26101-C3ML-SUB
26101-C3ML-SUB UCY BP-01 UCY BP-02
28006-C3ML-SUB CEMENT 14.72 31.05
28006-C3ML-SUB SAND 26.21 55.28
28006-C3ML-SUB STONE 37.73 71.42
28006-C3ML-SUB SIKA 204 0.00 0.00
S4000-C3S2-SUB SIKA 3006 ES 88.32 186.30
S4000-C3S2-SUB O-BASF 8320 0.00 0.00
S4000-C3S2-SUB
S4000-C3S2-SUB
33003-C3S1-ARC CP-07
33003-C3S1-ARC
33003-C3S1-ARC UCY BP-01 UCY BP-02
33003-C3S1-ARC CEMENT 34.24 8.41
S4000-C4S7-SUB SAND 69.47 16.85
S4000-C4S7-SUB STONE 87.42 21.36
S4000-C4S7-SUB SIKA 204 0.00 0.00
S4000-C4S7-SUB SIKA 3006 ES 0.00 0.00
CP-07 O-BASF 8320 376.59 84.05
CP-07
CP-07
CP-07 CP-03&04
CP-07
CP-07 UCY BP-01 UCY BP-02
CP-07 CEMENT 26.65 87.03
CP-07 SAND 54.79 175.65
CP-0602 STONE 67.21 214.93
CP-0602 SIKA 204 0.00 0.00
CP-0602 SIKA 3006 ES 0.00 59.34
CP-0602 O-BASF 8320 273.00 769.70
CP-0602 SIKA LATEX POWER 0.00 0.00
CP-0602
CP-0602
CP-0602

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 65.00 207.7 272.70
CP-07 83.5 20.50 104.00
CP-0602 32 67.5 99.50

total
202.10 tons
398.25 tons
500.07 tons
0.00 kg
333.96 kg
1503.34 kg
0.00 kg

total
45.77 tons
81.49 tons
109.15 tons
0.00 kg
274.62 kg
0.00 kg

total
42.65 tons
86.32 tons
108.78 tons
0.00 kg
0.00 kg
460.64 kg
total
113.68 tons
230.44 tons
282.14 tons
0.00 kg
59.34 kg
1042.70 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 09/03/2021
Summary RQ
DATE Plant RQ NO Material QTY
09/03/2021 UCY BP-01 286401 CEMENT 6.21
09/03/2021 UCY BP-01 286402 SAND 11.28
09/03/2021 UCY BP-01 286403 STONE 13.93
09/03/2021 UCY BP-01 286404 SIKA 3006 ES 37.26
09/03/2021 UCY BP-01 286405 CEMENT 3.82
09/03/2021 UCY BP-01 286406 SAND 6.94
09/03/2021 UCY BP-01 286407 STONE 8.57
09/03/2021 UCY BP-01 286408 SIKA 3006 ES 22.91
09/03/2021 UCY BP-01 286409 CEMENT 1.72
09/03/2021 UCY BP-01 286410 SAND 3.68
09/03/2021 UCY BP-01 286411 STONE 4.40
09/03/2021 UCY BP-01 286412 O-BASF 8320 15.50
09/03/2021 UCY BP-01 286413 CEMENT 0.92
09/03/2021 UCY BP-01 286414 SAND 3.78
09/03/2021 UCY BP-01 286415 STONE 4.19
09/03/2021 UCY BP-01 286416 O-BASF 8320 9.20
09/03/2021 UCY BP-01 286417 CEMENT 0.69
09/03/2021 UCY BP-01 286418 SAND 2.84
09/03/2021 UCY BP-01 286419 STONE 3.15
09/03/2021 UCY BP-01 286420 O-BASF 8320 6.90
09/03/2021 UCY BP-01 286421 CEMENT 0.79
09/03/2021 UCY BP-01 286422 SAND 1.99
09/03/2021 UCY BP-01 286423 STONE 2.31
09/03/2021 UCY BP-01 286424 O-BASF 8320 7.92
09/03/2021 UCY BP-01 286425 CEMENT 19.11
09/03/2021 UCY BP-01 286426 SAND 38.22
09/03/2021 UCY BP-01 286427 STONE 46.96
09/03/2021 UCY BP-01 286428 O-BASF 8320 191.10
09/03/2021 UCY BP-01 286429 CEMENT 1.26
09/03/2021 UCY BP-01 286430 SAND 2.52
09/03/2021 UCY BP-01 286431 STONE 3.09
09/03/2021 UCY BP-01 286432 O-BASF 8320 12.60
09/03/2021 UCY BP-01 286433 CEMENT 0.92
09/03/2021 UCY BP-01 286434 SAND 1.67
09/03/2021 UCY BP-01 286435 STONE 2.06
09/03/2021 UCY BP-01 286436 O-BASF 8320 9.20
09/03/2021 UCY BP-01 286437 CEMENT 0.92
09/03/2021 UCY BP-01 286438 SAND 1.67
09/03/2021 UCY BP-01 286439 STONE 2.06
09/03/2021 UCY BP-01 286440 O-BASF 8320 9.20
09/03/2021 UCY BP-01 286441 CEMENT 0.92
09/03/2021 UCY BP-01 286442 SAND 1.68
09/03/2021 UCY BP-01 286443 STONE 2.07
09/03/2021 UCY BP-01 286444 O-BASF 8320 9.20
09/03/2021 UCY BP-02 286445 CEMENT 5.15
09/03/2021 UCY BP-02 286446 SAND 9.36
09/03/2021 UCY BP-02 286447 STONE 11.56
09/03/2021 UCY BP-02 286448 SIKA 3006 ES 30.91
09/03/2021 UCY BP-02 286449 CEMENT 19.11
09/03/2021 UCY BP-02 286450 SAND 38.36
09/03/2021 UCY BP-02 286451 STONE 47.05
09/03/2021 UCY BP-02 286452 O-BASF 8320 191.10
09/03/2021 UCY BP-02 286453 CEMENT 0.69
09/03/2021 UCY BP-02 286454 SAND 1.25
09/03/2021 UCY BP-02 286455 STONE 1.55
09/03/2021 UCY BP-02 286456 O-BASF 8320 6.90
09/03/2021 UCY BP-01 CEMENT 35.47
09/03/2021 UCY BP-01 SAND 70.07
09/03/2021 UCY BP-01 STONE 90.39
09/03/2021 UCY BP-01 O-BASF 8320 354.65
09/03/2021 UCY BP-02 CEMENT 35.65
09/03/2021 UCY BP-02 SAND 63.63
09/03/2021 UCY BP-02 STONE 81.61
09/03/2021 UCY BP-02 SIKA 3006 ES 213.90

Record BY
Operator
21
SUBJOB RECORDER
28001-SP-A-SUP CEMENT 133.35 tons
28001-SP-A-SUP SAND 258.94 tons
28001-SP-A-SUP STONE 324.95 tons
28001-SP-A-SUP SIKA 204 0.00 kg
20103-TRAFFICM SIKA 3006 ES 304.98 kg
20103-TRAFFICM O-BASF 8320 823.47 kg
20103-TRAFFICM SIKA LATEX POWER 0.00 kg
20103-TRAFFICM
28003-C3ML-SUB UCY BP-01 UCY BP-02
28003-C3ML-SUB CEMENT 72.75 60.60
28003-C3ML-SUB SAND 146.34 112.60
28003-C3ML-SUB STONE 183.18 141.77
S4000-C3S2-SUB SIKA 204 0.00 0.00
S4000-C3S2-SUB SIKA 3006 ES 60.17 244.81
S4000-C3S2-SUB O-BASF 8320 625.47 198.00
S4000-C3S2-SUB SIKA LATEX POWER 0.00 0.00
S4000-C3S1-SUB
S4000-C3S1-SUB CP-0602
S4000-C3S1-SUB
S4000-C3S1-SUB UCY BP-01 UCY BP-02
20106-TRAFFICM CEMENT 0.00 35.65
20106-TRAFFICM SAND 0.00 0.00
20106-TRAFFICM STONE 0.00 0.00
20106-TRAFFICM SIKA 204 0.00 0.00
S4000-C4S7-SUB SIKA 3006 ES 0.00 0.00
S4000-C4S7-SUB O-BASF 8320 0.00 0.00
S4000-C4S7-SUB
S4000-C4S7-SUB
33003-C3S1-ARC CP-07
33003-C3S1-ARC
33003-C3S1-ARC UCY BP-01 UCY BP-02
33003-C3S1-ARC CEMENT 35.47 0.00
S4000-C3S2-SUB SAND 70.07 0.00
S4000-C3S2-SUB STONE 90.39 0.00
S4000-C3S2-SUB SIKA 204 0.00 0.00
S4000-C3S2-SUB SIKA 3006 ES 0.00 0.00
S4000-C3S1-SUB O-BASF 8320 354.65 0.00
S4000-C3S1-SUB
S4000-C3S1-SUB
S4000-C3S1-SUB CP-03&04
28006-C4ML-SUB
28006-C4ML-SUB UCY BP-01 UCY BP-02
28006-C4ML-SUB CEMENT 37.28 24.95
28006-C4ML-SUB SAND 76.27 112.60
28001-SP-A-SUP STONE 92.79 141.77
28001-SP-A-SUP SIKA 204 0.00 0.00
28001-SP-A-SUP SIKA 3006 ES 60.17 244.81
28001-SP-A-SUP O-BASF 8320 270.82 198.00
S4000-C4S7-SUB SIKA LATEX POWER 0.00 0.00
S4000-C4S7-SUB
S4000-C4S7-SUB
S4000-C4S7-SUB
S4000-C3S3-SUB
S4000-C3S3-SUB
S4000-C3S3-SUB
S4000-C3S3-SUB
CP-07
CP-07
CP-07
CP-07
CP-0602
CP-0603
CP-0604
CP-0605

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 89.70 0 89.70
CP-07 86.5 0.00 86.50
CP-0602 0 77.5 77.50

total
133.35 tons
258.94 tons
324.95 tons
0.00 kg
304.98 kg
823.47 kg
0.00 kg

total
35.65 tons
0.00 tons
0.00 tons
0.00 kg
0.00 kg
0.00 kg

total
35.47 tons
70.07 tons
90.39 tons
0.00 kg
0.00 kg
354.65 kg
total
62.23 tons
188.87 tons
234.56 tons
0.00 kg
304.98 kg
468.82 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 10/03/2021
Summary RQ
DATE Plant RQ NO Material QTY
10/03/2021 UCY BP-01 286457 CEMENT 1.23
10/03/2021 UCY BP-01 286458 SAND 2.5
10/03/2021 UCY BP-01 286459 STONE 3.14
10/03/2021 UCY BP-01 286460 O-BASF 8320 12.3
10/03/2021 UCY BP-01 286461 CEMENT 3.68
10/03/2021 UCY BP-01 286462 SAND 7.11
10/03/2021 UCY BP-01 286463 STONE 7.78
10/03/2021 UCY BP-01 286464 O-BASF 8320 34.5
10/03/2021 UCY BP-02 286465 CEMENT 3.82
10/03/2021 UCY BP-02 286466 SAND 6.93
10/03/2021 UCY BP-02 286467 STONE 8.57
10/03/2021 UCY BP-02 286468 SIKA 3006 ES 22.91
10/03/2021 UCY BP-02 286469 CEMENT 7.4
10/03/2021 UCY BP-02 286470 SAND 13.44
10/03/2021 UCY BP-02 286471 STONE 16.64
10/03/2021 UCY BP-02 286472 SIKA 3006 ES 44.43
10/03/2021 UCY BP-02 286473 CEMENT 1.72
10/03/2021 UCY BP-02 286474 SAND 3.68
10/03/2021 UCY BP-02 286475 STONE 4.41
10/03/2021 UCY BP-02 286476 O-BASF 8320 15.5
10/03/2021 UCY BP-02 286477 CEMENT 0.42
10/03/2021 UCY BP-02 286478 SAND 0.84
10/03/2021 UCY BP-02 286479 STONE 1.03
10/03/2021 UCY BP-02 286480 O-BASF 8320 4.2
10/03/2021 UCY BP-02 286481 CEMENT 2.52
10/03/2021 UCY BP-02 286482 SAND 5.03
10/03/2021 UCY BP-02 286483 STONE 6.2
10/03/2021 UCY BP-02 286484 O-BASF 8320 25.2
10/03/2021 UCY BP-01 CEMENT 37.93
10/03/2021 UCY BP-01 SAND 77.05
10/03/2021 UCY BP-01 STONE 96.76
10/03/2021 UCY BP-01 O-BASF 8320 379.25
10/03/2021 UCY BP-02 CEMENT 2.05
10/03/2021 UCY BP-02 SAND 4.08
10/03/2021 UCY BP-02 STONE 5.22
10/03/2021 UCY BP-02 O-BASF 8320 20.5
10/03/2021 UCY BP-02 CEMENT 38.87
10/03/2021 UCY BP-02 SAND 69.46
10/03/2021 UCY BP-02 STONE 88.73
10/03/2021 UCY BP-02 SIKA 3006 ES 233.22
Record BY
Operator
21
SUBJOB RECORDER
11303-LAB CEMENT 99.64 tons
11303-LAB SAND 190.12 tons
11303-LAB STONE 238.48 tons
11303-LAB SIKA 204 0.00 kg
S4000-C3S4-SUB SIKA 3006 ES 300.56 kg
S4000-C3S4-SUB O-BASF 8320 491.45 kg
S4000-C3S4-SUB SIKA LATEX POWER 0.00 kg
S4000-C3S4-SUB
20103-TRAFFICM UCY BP-01 UCY BP-02
20103-TRAFFICM CEMENT 42.84 56.80
20103-TRAFFICM SAND 86.66 103.46
20103-TRAFFICM STONE 107.68 130.80
28001-SP-A-SUP SIKA 204 0.00 0.00
28001-SP-A-SUP SIKA 3006 ES 0.00 300.56
28001-SP-A-SUP O-BASF 8320 426.05 65.40
28001-SP-A-SUP SIKA LATEX POWER 0.00 0.00
28003-C3ML-SUB
28003-C3ML-SUB CP-0602
28003-C3ML-SUB
28003-C3ML-SUB UCY BP-01 UCY BP-02
33003-C3S4-ARC CEMENT 0.00 38.87
33003-C3S4-ARC SAND 0.00 69.46
33003-C3S4-ARC STONE 0.00 88.73
33003-C3S4-ARC SIKA 204 0.00 0.00
S4000-C2S2-SUB SIKA 3006 ES 0.00 233.22
S4000-C2S2-SUB O-BASF 8320 0.00 0.00
S4000-C2S2-SUB
S4000-C2S2-SUB
CP-07 CP-07
CP-07
CP-07 UCY BP-01 UCY BP-02
CP-07 CEMENT 37.93 2.05
CP-07 SAND 77.05 4.08
CP-07 STONE 96.76 5.22
CP-07 SIKA 204 0.00 0.00
CP-07 SIKA 3006 ES 0.00 0.00
CP-0602 O-BASF 8320 379.25 20.50
CP-0602
CP-0602
CP-0602 CP-03&04
UCY BP-01 UCY BP-02
CEMENT 4.91 15.88
SAND 9.61 29.92
STONE 10.92 36.85
SIKA 204 0.00 0.00
SIKA 3006 ES 0.00 67.34
O-BASF 8320 46.80 44.90
SIKA LATEX POWER 0.00 0.00

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 11.00 35.6 46.60
CP-07 92.5 5.00 97.50
CP-0602 0 84.5 84.50

total
99.64 tons
190.12 tons
238.48 tons
0.00 kg
300.56 kg
491.45 kg
0.00 kg

total
38.87 tons
69.46 tons
88.73 tons
0.00 kg
233.22 kg
0.00 kg

total
39.98 tons
81.13 tons
101.98 tons
0.00 kg
0.00 kg
399.75 kg
total
20.79 tons
39.53 tons
47.77 tons
0.00 kg
67.34 kg
91.70 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 11/03/2021
Summary RQ
DATE Plant RQ NO Material QTY
11/03/2021 UCY BP-01 286501 CEMENT 8.32
11/03/2021 UCY BP-01 286502 SAND 8.77
11/03/2021 UCY BP-01 286503 STONE 18.72
11/03/2021 UCY BP-01 286504 O-BASF 8320 9.2
11/03/2021 UCY BP-01 286505 SIKA 3006 ES 44.44
11/03/2021 UCY BP-01 286506 CEMENT 2.44
11/03/2021 UCY BP-01 286507 SAND 2.33
11/03/2021 UCY BP-01 286508 STONE 5.48
11/03/2021 UCY BP-01 286509 SIKA 3006 ES 14.62
11/03/2021 UCY BP-01 286510 CEMENT 0.86
11/03/2021 UCY BP-01 286511 SAND 2.18
11/03/2021 UCY BP-01 286512 STONE 2.52
11/03/2021 UCY BP-01 286513 O-BASF 8320 8.64
11/03/2021 UCY BP-01 286514 CEMENT 2.07
11/03/2021 UCY BP-01 286515 SAND 3.78
11/03/2021 UCY BP-01 286516 STONE 4.66
11/03/2021 UCY BP-01 286517 O-BASF 8320 20.7
11/03/2021 UCY BP-01 286518 CEMENT 19.11
11/03/2021 UCY BP-01 286519 SAND 38.4
11/03/2021 UCY BP-01 286520 STONE 47.09
11/03/2021 UCY BP-01 286521 O-BASF 8320 191.1
11/03/2021 UCY BP-02 286522 CEMENT 14.23
11/03/2021 UCY BP-02 286523 SAND 35.68
11/03/2021 UCY BP-02 286524 STONE 43.52
11/03/2021 UCY BP-02 286525 SIKA 204 196
11/03/2021 UCY BP-02 286526 CEMENT 3.67
11/03/2021 UCY BP-02 286527 SAND 7.08
11/03/2021 UCY BP-02 286528 STONE 7.74
11/03/2021 UCY BP-02 286529 O-BASF 8320 34.5
11/03/2021 UCY BP-02 286530 CEMENT 1.72
11/03/2021 UCY BP-02 286531 SAND 3.69
11/03/2021 UCY BP-02 286532 STONE 4.41
11/03/2021 UCY BP-02 286533 O-BASF 8320 15.5
11/03/2021 UCY BP-02 286534 CEMENT 0.46
11/03/2021 UCY BP-02 286535 SAND 0.84
11/03/2021 UCY BP-02 286536 STONE 1.03
11/03/2021 UCY BP-02 286537 O-BASF 8320 4.6
11/03/2021 UCY BP-02 286538 CEMENT 1.5
11/03/2021 UCY BP-02 286539 SAND 6.16
11/03/2021 UCY BP-02 286540 STONE 6.82
11/03/2021 UCY BP-02 286541 O-BASF 8320 14.95
11/03/2021 UCY BP-02 286542 CEMENT 1.2
11/03/2021 UCY BP-02 286543 SAND 2.18
11/03/2021 UCY BP-02 286544 STONE 2.68
11/03/2021 UCY BP-02 286545 SIKA 3006 ES 7.18
11/03/2021 UCY BP-02 286546 CEMENT 1.38
11/03/2021 UCY BP-02 286547 SAND 2.51
11/03/2021 UCY BP-02 286548 STONE 3.1
11/03/2021 UCY BP-02 286549 SIKA 3006 ES 8.28
11/03/2021 UCY BP-02 286550 CEMENT 19.11
11/03/2021 UCY BP-02 286551 SAND 38.4
11/03/2021 UCY BP-02 286552 STONE 47.09
11/03/2021 UCY BP-02 286553 O-BASF 8320 191.1
11/03/2021 UCY BP-01 CEMENT 13.74
11/03/2021 UCY BP-01 SAND 27.34
11/03/2021 UCY BP-01 STONE 34.97
11/03/2021 UCY BP-01 O-BASF 8320 137.35
11/03/2021 UCY BP-02 CEMENT 28.7
11/03/2021 UCY BP-02 SAND 58.24
11/03/2021 UCY BP-02 STONE 73.22
11/03/2021 UCY BP-02 O-BASF 8320 287
11/03/2021 UCY BP-01 CEMENT 48.66
11/03/2021 UCY BP-01 SAND 86.36
11/03/2021 UCY BP-01 STONE 111.3
11/03/2021 UCY BP-01 O-BASF 8320 292.00
11/03/2021 UCY BP-02 CEMENT 19.09
11/03/2021 UCY BP-02 SAND 34.07
11/03/2021 UCY BP-02 STONE 43.66
11/03/2021 UCY BP-02 SIKA 3006 ES 114.54

Record BY
Operator
21
SUBJOB RECORDER
28001-SP-A-SUP CEMENT 186.26 tons
28001-SP-A-SUP SAND 358.01 tons
28001-SP-A-SUP STONE 458.01 tons
28001-SP-A-SUP SIKA 204 196.00 kg
28001-SP-A-SUP SIKA 3006 ES 189.06 kg
20103-TRAFFICM O-BASF 8320 1206.64 kg
20103-TRAFFICM SIKA LATEX POWER 0.00 kg
20103-TRAFFICM
20103-TRAFFICM UCY BP-01 UCY BP-02
28006-C3ML-SUB CEMENT 95.20 91.06
28006-C3ML-SUB SAND 169.16 188.85
28006-C3ML-SUB STONE 224.74 233.27
28006-C3ML-SUB SIKA 204 0.00 196.00
24000-C3ML-SUB SIKA 3006 ES 59.06 130.00
24000-C3ML-SUB O-BASF 8320 658.99 547.65
24000-C3ML-SUB SIKA LATEX POWER 0.00 0.00
24000-C3ML-SUB
S4000-C4S6-SUB CP-0602
S4000-C4S6-SUB
S4000-C4S6-SUB UCY BP-01 UCY BP-02
S4000-C4S6-SUB CEMENT 48.66 19.09
31002-C3S2-SUB SAND 0.00 34.07
31002-C3S2-SUB STONE 0.00 43.66
31002-C3S2-SUB SIKA 204 0.00 0.00
31002-C3S2-SUB SIKA 3006 ES 0.00 114.54
S4000-C3S4-SUB O-BASF 8320 0.00 0.00
S4000-C3S4-SUB
S4000-C3S4-SUB
S4000-C3S4-SUB CP-07
28003-C3ML-SUB
28003-C3ML-SUB UCY BP-01 UCY BP-02
28003-C3ML-SUB CEMENT 13.74 28.70
28003-C3ML-SUB SAND 27.34 58.24
24000-C3ML-SUB STONE 34.97 73.22
24000-C3ML-SUB SIKA 204 0.00 0.00
24000-C3ML-SUB SIKA 3006 ES 0.00 0.00
24000-C3ML-SUB O-BASF 8320 137.35 287.00
S4000-C3S1-SUB
S4000-C3S1-SUB
S4000-C3S1-SUB CP-03&04
S4000-C3S1-SUB
28001-SP-A-SUP UCY BP-01 UCY BP-02
28001-SP-A-SUP CEMENT 32.80 43.27
28001-SP-A-SUP SAND 141.82 96.54
28001-SP-A-SUP STONE 189.77 116.39
20103-TRAFFICM SIKA 204 0.00 196.00
20103-TRAFFICM SIKA 3006 ES 59.06 15.46
20103-TRAFFICM O-BASF 8320 521.64 260.65
20103-TRAFFICM SIKA LATEX POWER 0.00 0.00
S4000-C4S6-SUB
S4000-C4S6-SUB
S4000-C4S6-SUB
S4000-C4S6-SUB
CP-07
CP-07
CP-07
CP-07
CP-07
CP-07
CP-07
CP-07
CP-0602
CP-0603
CP-0604
CP-0605
CP-0602
CP-0602
CP-0602
CP-0602

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 75.50 111.3 186.80
CP-07 33.5 70.00 103.50
CP-0602 105.8 41.5 147.30

total
186.26 tons
358.01 tons
458.01 tons
196.00 kg
189.06 kg
1206.64 kg
0.00 kg

total
67.75 tons
34.07 tons
43.66 tons
0.00 kg
114.54 kg
0.00 kg

total
42.44 tons
85.58 tons
108.19 tons
0.00 kg
0.00 kg
424.35 kg
total
76.07 tons
238.36 tons
306.16 tons
196.00 kg
74.52 kg
782.29 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 12/03/2021
Summary RQ
DATE Plant RQ NO Material QTY
12/03/2021 UCY BP-01 286554 CEMENT 35.49
12/03/2021 UCY BP-01 286555 SAND 71.32
12/03/2021 UCY BP-01 286556 STONE 87.63
12/03/2021 UCY BP-01 286557 O-BASF 8320 354.9
12/03/2021 UCY BP-02 286558 CEMENT 2.07
12/03/2021 UCY BP-02 286559 SAND 3.76
12/03/2021 UCY BP-02 286560 STONE 4.64
12/03/2021 UCY BP-02 286561 SIKA 3006 ES 12.42
12/03/2021 UCY BP-02 286562 CEMENT 1.72
12/03/2021 UCY BP-02 286563 SAND 3.68
12/03/2021 UCY BP-02 286564 STONE 4.41
12/03/2021 UCY BP-02 286565 O-BASF 8320 15.5
12/03/2021 UCY BP-02 286566 CEMENT 90.09
12/03/2021 UCY BP-02 286567 SAND 181.04
12/03/2021 UCY BP-02 286568 STONE 222.44
12/03/2021 UCY BP-02 286569 O-BASF 8320 900.9
12/03/2021 UCY BP-01 CEMENT 5.95
12/03/2021 UCY BP-01 SAND 11.92
12/03/2021 UCY BP-01 STONE 15.15
12/03/2021 UCY BP-01 O-BASF 8320 59.45
12/03/2021 UCY BP-02 CEMENT 13.12
12/03/2021 UCY BP-02 SAND 26.3
12/03/2021 UCY BP-02 STONE 33.44
12/03/2021 UCY BP-02 O-BASF 8320 131.2
12/03/2021 UCY BP-01 CEMENT 60.63
12/03/2021 UCY BP-01 SAND 107.94
12/03/2021 UCY BP-01 STONE 138.65
12/03/2021 UCY BP-01 SIKA 3006 ES 363.77
Record BY
Operator
21
SUBJOB RECORDER
S4000-C4S5-SUB CEMENT 209.07 tons
S4000-C4S5-SUB SAND 405.96 tons
S4000-C4S5-SUB STONE 506.36 tons
S4000-C4S5-SUB SIKA 204 0.00 kg
20103-TRAFFICM SIKA 3006 ES 376.19 kg
20103-TRAFFICM O-BASF 8320 1461.95 kg
20103-TRAFFICM SIKA LATEX POWER 0.00 kg
20103-TRAFFICM
28003-C3ML-SUB UCY BP-01 UCY BP-02
28003-C3ML-SUB CEMENT 102.07 107.00
28003-C3ML-SUB SAND 191.18 214.78
28003-C3ML-SUB STONE 241.43 264.93
S4000-C4S5-SUB SIKA 204 0.00 0.00
S4000-C4S5-SUB SIKA 3006 ES 363.77 12.42
S4000-C4S5-SUB O-BASF 8320 414.35 1047.60
S4000-C4S5-SUB SIKA LATEX POWER 0.00 0.00
CP-07
CP-07 CP-0602
CP-07
CP-07 UCY BP-01 UCY BP-02
CP-07 CEMENT 60.63 0.00
CP-07 SAND 107.94 0.00
CP-07 STONE 138.65 0.00
CP-07 SIKA 204 0.00 0.00
CP-0602 SIKA 3006 ES 363.77 0.00
CP-0602 O-BASF 8320 0.00 0.00
CP-0602
CP-0602
CP-07

UCY BP-01 UCY BP-02


CEMENT 5.95 13.12
SAND 11.92 26.30
STONE 15.15 33.44
SIKA 204 0.00 0.00
SIKA 3006 ES 0.00 0.00
O-BASF 8320 59.45 131.20

CP-03&04
UCY BP-01 UCY BP-02
CEMENT 35.49 93.88
SAND 71.32 188.48
STONE 87.63 231.49
SIKA 204 0.00 0.00
SIKA 3006 ES 0.00 12.42
O-BASF 8320 354.90 916.40
SIKA LATEX POWER 0.00 0.00

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 84.50 223.2 307.70
CP-07 14.5 32.00 46.50
CP-0602 131.8 0 131.80

total
209.07 tons
405.96 tons
506.36 tons
0.00 kg
376.19 kg
1461.95 kg
0.00 kg

total
60.63 tons
107.94 tons
138.65 tons
0.00 kg
363.77 kg
0.00 kg

total
19.07 tons
38.22 tons
48.59 tons
0.00 kg
0.00 kg
190.65 kg
total
129.37 tons
259.80 tons
319.12 tons
0.00 kg
12.42 kg
1271.30 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 13/03/2021
Summary RQ
DATE Plant RQ NO Material QTY
13/3/2021 UCY BP-01 286570 CEMENT 13.65
13/3/2021 UCY BP-01 286571 SAND 27.27
13/3/2021 UCY BP-01 286572 STONE 33.51
13/3/2021 UCY BP-01 286573 O-BASF 8320 136.5
13/3/2021 UCY BP-01 286574 CEMENT 9.47
13/3/2021 UCY BP-01 286575 SAND 19.26
13/3/2021 UCY BP-01 286576 STONE 22.68
13/3/2021 UCY BP-01 286577 O-BASF 8320 92.4
13/3/2021 UCY BP-02 286578 CEMENT 13.65
13/3/2021 UCY BP-02 286579 SAND 27.43
13/3/2021 UCY BP-02 286580 STONE 33.7
13/3/2021 UCY BP-02 286581 O-BASF 8320 136.5
13/3/2021 UCY BP-02 286582 CEMENT 1.38
13/3/2021 UCY BP-02 286583 SAND 2.51
13/3/2021 UCY BP-02 286584 STONE 3.09
13/3/2021 UCY BP-02 286585 SIKA 3006 ES 8.28
13/3/2021 UCY BP-02 286586 CEMENT 8.37
13/3/2021 UCY BP-02 286587 SAND 15.2
13/3/2021 UCY BP-02 286588 STONE 18.76
13/3/2021 UCY BP-02 286589 SIKA 3006 ES 50.23
13/3/2021 UCY BP-02 286590 CEMENT 0.46
13/3/2021 UCY BP-02 286591 SAND 0.84
13/3/2021 UCY BP-02 286592 STONE 1.03
13/3/2021 UCY BP-02 286593 O-BASF 8320 4.6
13/3/2021 UCY BP-02 286594 CEMENT 1.72
13/3/2021 UCY BP-02 286595 SAND 3.68
13/3/2021 UCY BP-02 286596 STONE 4.4
13/3/2021 UCY BP-02 286597 O-BASF 8320 15.5
13/3/2021 UCY BP-02 286598 CEMENT 0.77
13/3/2021 UCY BP-02 286600 SAND 1.94
13/3/2021 UCY BP-02 286485 STONE 2.25
13/3/2021 UCY BP-02 286486 O-BASF 8320 7.74
13/3/2021 UCY BP-02 CEMENT 27.88
13/3/2021 UCY BP-02 SAND 56.03
13/3/2021 UCY BP-02 STONE 70.99
13/3/2021 UCY BP-02 O-BASF 8320 278.8
13/3/2021 UCY BP-01 CEMENT 33.58
13/3/2021 UCY BP-01 SAND 59.86
13/3/2021 UCY BP-01 STONE 76.94
13/3/2021 UCY BP-01 SIKA 3006 ES 201.48
Record BY
Operator
21
SUBJOB RECORDER
S4000-C4S5-SUB CEMENT 110.93 tons
S4000-C4S5-SUB SAND 214.02 tons
S4000-C4S5-SUB STONE 267.35 tons
S4000-C4S5-SUB SIKA 204 0.00 kg
S4000-C3S2-SUB SIKA 3006 ES 259.99 kg
S4000-C3S2-SUB O-BASF 8320 672.04 kg
S4000-C3S2-SUB SIKA LATEX POWER 0.00 kg
S4000-C3S2-SUB
S4000-C4S5-SUB UCY BP-01 UCY BP-02
S4000-C4S5-SUB CEMENT 56.70 54.23
S4000-C4S5-SUB SAND 106.39 107.63
S4000-C4S5-SUB STONE 133.13 134.22
20103-TRAFFICM SIKA 204 0.00 0.00
20103-TRAFFICM SIKA 3006 ES 201.48 58.51
20103-TRAFFICM O-BASF 8320 228.90 443.14
20103-TRAFFICM SIKA LATEX POWER 0.00 0.00
28001-SP-A-SUP
28001-SP-A-SUP CP-0602
28001-SP-A-SUP
28001-SP-A-SUP UCY BP-01 UCY BP-02
S4000-C4S1-SUB CEMENT 33.58 0.00
S4000-C4S1-SUB SAND 59.86 0.00
S4000-C4S1-SUB STONE 76.94 0.00
S4000-C4S1-SUB SIKA 204 0.00 0.00
28003-C3ML-SUB SIKA 3006 ES 201.48 0.00
28003-C3ML-SUB O-BASF 8320 0.00 0.00
28003-C3ML-SUB
28003-C3ML-SUB
20106-TRAFFICM CP-07
20106-TRAFFICM
20106-TRAFFICM UCY BP-01 UCY BP-02
20106-TRAFFICM CEMENT 0.00 27.88
CP-07 SAND 0.00 56.03
CP-07 STONE 0.00 70.99
CP-07 SIKA 204 0.00 0.00
CP-07 SIKA 3006 ES 0.00 0.00
CP-0602 O-BASF 8320 0.00 278.80
CP-0602
CP-0602
CP-0602 CP-03&04
UCY BP-01 UCY BP-02
CEMENT 23.12 26.35
SAND 46.53 51.60
STONE 56.19 63.23
SIKA 204 0.00 0.00
SIKA 3006 ES 0.00 58.51
O-BASF 8320 228.90 164.34
SIKA LATEX POWER 0.00 0.00

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 0.00 61.05 61.05
CP-07 0 68.00 68.00
CP-0602 73 0 73.00

total
110.93 tons
214.02 tons
267.35 tons
0.00 kg
259.99 kg
672.04 kg
0.00 kg

total
33.58 tons
59.86 tons
76.94 tons
0.00 kg
201.48 kg
0.00 kg

total
27.88 tons
56.03 tons
70.99 tons
0.00 kg
0.00 kg
278.80 kg
total
49.47 tons
98.13 tons
119.42 tons
0.00 kg
58.51 kg
393.24 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 14/03/2021
Summary RQ
DATE Plant RQ NO Material QTY
14/3/2021 UCY BP-01 286701 CEMENT 1.3
14/3/2021 UCY BP-01 286702 SAND 3.06
14/3/2021 UCY BP-01 286703 STONE 5.17
14/3/2021 UCY BP-01 286704 O-BASF 8320 10.4
14/3/2021 UCY BP-02 286705 CEMENT 9.47
14/3/2021 UCY BP-02 286706 SAND 19.28
14/3/2021 UCY BP-02 286707 STONE 22.77
14/3/2021 UCY BP-02 286708 O-BASF 8320 92.4
14/3/2021 UCY BP-02 286709 CEMENT 26.27
14/3/2021 UCY BP-02 286710 SAND 52.88
14/3/2021 UCY BP-02 286711 STONE 64.17
14/3/2021 UCY BP-02 286712 O-BASF 8320 260.4
14/3/2021 UCY BP-02 286713 CEMENT 1.38
14/3/2021 UCY BP-02 286714 SAND 2.51
14/3/2021 UCY BP-02 286715 STONE 3.1
14/3/2021 UCY BP-02 286716 SIKA 3006 ES 8.28
14/3/2021 UCY BP-02 286717 CEMENT 8.14
14/3/2021 UCY BP-02 286718 SAND 14.8
14/3/2021 UCY BP-02 286719 STONE 18.28
14/3/2021 UCY BP-02 286720 SIKA 3006 ES 48.85
14/3/2021 UCY BP-02 286721 CEMENT 1.72
14/3/2021 UCY BP-02 286722 SAND 3.69
14/3/2021 UCY BP-02 286723 STONE 4.41
14/3/2021 UCY BP-02 286724 O-BASF 8320 15.5
14/3/2021 UCY BP-02 286725 CEMENT 0.92
14/3/2021 UCY BP-02 286726 SAND 3.78
14/3/2021 UCY BP-02 286727 STONE 4.2
14/3/2021 UCY BP-02 286728 O-BASF 8320 9.2
14/3/2021 UCY BP-01 CEMENT 3.08
14/3/2021 UCY BP-01 SAND 6.19
14/3/2021 UCY BP-01 STONE 7.89
14/3/2021 UCY BP-01 O-BASF 8320 29.94
14/3/2021 UCY BP-02 CEMENT 41.21
14/3/2021 UCY BP-02 SAND 82.51
14/3/2021 UCY BP-02 STONE 105.02
14/3/2021 UCY BP-02 O-BASF 8320 412.05
14/3/2021 UCY BP-01 CEMENT 33.72
14/3/2021 UCY BP-01 SAND 60.4
14/3/2021 UCY BP-01 STONE 76.97
14/3/2021 UCY BP-01 SIKA 3006 ES 202.31
14/3/2021 UCY BP-02 CEMENT 9.43
14/3/2021 UCY BP-02 SAND 16.89
14/3/2021 UCY BP-02 STONE 21.53
14/3/2021 UCY BP-02 SIKA 3006 ES 56.58

Record BY
Operator
21
SUBJOB RECORDER
S4000-C3S1-SUB CEMENT 136.64 tons
S4000-C3S1-SUB SAND 265.99 tons
S4000-C3S1-SUB STONE 333.51 tons
S4000-C3S1-SUB SIKA 204 0.00 kg
S4000-C3S2-SUB SIKA 3006 ES 316.02 kg
S4000-C3S2-SUB O-BASF 8320 829.89 kg
S4000-C3S2-SUB SIKA LATEX POWER 0.00 kg
S4000-C3S2-SUB
S4000-C3S3-SUB UCY BP-01 UCY BP-02
S4000-C3S3-SUB CEMENT 38.10 98.54
S4000-C3S3-SUB SAND 69.65 196.34
S4000-C3S3-SUB STONE 90.03 243.48
20103-TRAFFICM SIKA 204 0.00 0.00
20103-TRAFFICM SIKA 3006 ES 202.31 113.71
20103-TRAFFICM O-BASF 8320 40.34 789.55
20103-TRAFFICM SIKA LATEX POWER 0.00 0.00
28001-SP-A-SUP
28001-SP-A-SUP CP-0602
28001-SP-A-SUP
28001-SP-A-SUP UCY BP-01 UCY BP-02
28003-C3ML-SUB CEMENT 33.72 9.43
28003-C3ML-SUB SAND 60.40 16.89
28003-C3ML-SUB STONE 76.97 21.53
28003-C3ML-SUB SIKA 204 0.00 0.00
S4000-C3S1-SUB SIKA 3006 ES 202.31 56.58
S4000-C3S1-SUB O-BASF 8320 0.00 0.00
S4000-C3S1-SUB
S4000-C3S1-SUB
CP-07 CP-07
CP-07
CP-07 UCY BP-01 UCY BP-02
CP-07 CEMENT 3.08 41.21
CP-07 SAND 6.19 82.51
CP-07 STONE 7.89 105.02
CP-07 SIKA 204 0.00 0.00
CP-07 SIKA 3006 ES 0.00 0.00
CP-0602 O-BASF 8320 29.94 412.05
CP-0602
CP-0602
CP-0602 CP-03&04
CP-0602
CP-0602 UCY BP-01 UCY BP-02
CP-0602 CEMENT 1.30 47.90
CP-0602 SAND 3.06 96.94
STONE 5.17 116.93
SIKA 204 0.00 0.00
SIKA 3006 ES 0.00 57.13
O-BASF 8320 10.40 377.50
SIKA LATEX POWER 0.00 0.00

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 4.00 113.9 117.90
CP-07 7.5 100.50 108.00
CP-0602 73.3 20.5 93.80

total
136.64 tons
265.99 tons
333.51 tons
0.00 kg
316.02 kg
829.89 kg
0.00 kg

total
43.15 tons
77.29 tons
98.50 tons
0.00 kg
258.89 kg
0.00 kg

total
44.29 tons
88.70 tons
112.91 tons
0.00 kg
0.00 kg
441.99 kg
total
49.20 tons
100.00 tons
122.10 tons
0.00 kg
57.13 kg
387.90 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 15/03/2021
Summary RQ
DATE Plant RQ NO Material QTY
15/3/2021 UCY BP-01 286729 CEMENT 0.294
15/3/2021 UCY BP-01 286730 SAND 0.59
15/3/2021 UCY BP-01 286731 STONE 0.72
15/3/2021 UCY BP-01 286732 O-BASF 8320 2.94
15/3/2021 UCY BP-01 286733 CEMENT 1.05
15/3/2021 UCY BP-01 286734 SAND 2.1
15/3/2021 UCY BP-01 286735 STONE 2.58
15/3/2021 UCY BP-01 286736 O-BASF 8320 10.5
15/3/2021 UCY BP-01 286737 CEMENT 0.63
15/3/2021 UCY BP-01 286738 SAND 1.26
15/3/2021 UCY BP-01 286739 STONE 1.55
15/3/2021 UCY BP-01 286740 O-BASF 8320 6.3
15/3/2021 UCY BP-01 286741 CEMENT 1.38
15/3/2021 UCY BP-01 286742 SAND 2.5
15/3/2021 UCY BP-01 286743 STONE 3.1
15/3/2021 UCY BP-01 286744 O-BASF 8320 13.8
15/3/2021 UCY BP-01 286745 CEMENT 1.72
15/3/2021 UCY BP-01 286746 SAND 3.68
15/3/2021 UCY BP-01 286747 STONE 4.41
15/3/2021 UCY BP-01 286748 O-BASF 8320 15.5
15/3/2021 UCY BP-01 286749 CEMENT 0.79
15/3/2021 UCY BP-01 286750 SAND 1.98
15/3/2021 UCY BP-01 286751 STONE 2.31
15/3/2021 UCY BP-01 286752 O-BASF 8320 7.92
15/3/2021 UCY BP-01 286753 CEMENT 1.93
15/3/2021 UCY BP-01 286754 SAND 3.52
15/3/2021 UCY BP-01 286755 STONE 4.33
15/3/2021 UCY BP-01 286756 SIKA 3006 ES 11.59
15/3/2021 UCY BP-02 286757 CEMENT 2.3
15/3/2021 UCY BP-02 286758 SAND 4.58
15/3/2021 UCY BP-02 286759 STONE 4.64
15/3/2021 UCY BP-02 286760 O-BASF 8320 20.7
15/3/2021 UCY BP-02 286761 CEMENT 1.38
15/3/2021 UCY BP-02 286762 SAND 2.5
15/3/2021 UCY BP-02 286763 STONE 3.1
15/3/2021 UCY BP-02 286764 SIKA 3006 ES 8.28
15/3/2021 UCY BP-02 286765 CEMENT 6.21
15/3/2021 UCY BP-02 286766 SAND 11.26
15/3/2021 UCY BP-02 286767 STONE 13.95
15/3/2021 UCY BP-02 286768 SIKA 3006 ES 37.26
15/3/2021 UCY BP-02 286769 CEMENT 1.75
15/3/2021 UCY BP-02 286770 SAND 4.36
15/3/2021 UCY BP-02 286771 STONE 5.45
15/3/2021 UCY BP-02 286772 SIKA 204 24.5
15/3/2021 UCY BP-02 CEMENT 36.7
15/3/2021 UCY BP-02 SAND 73.93
15/3/2021 UCY BP-02 STONE 93.17
15/3/2021 UCY BP-02 O-BASF 8320 366.95
15/3/2021 UCY BP-01 CEMENT 50.97
15/3/2021 UCY BP-01 SAND 90.86
15/3/2021 UCY BP-01 STONE 116.78
15/3/2021 UCY BP-01 SIKA 3006 ES 305.81
15/3/2021 UCY BP-02 CEMENT 10.12
15/3/2021 UCY BP-02 SAND 18.04
15/3/2021 UCY BP-02 STONE 23.17
15/3/2021 UCY BP-02 SIKA 3006 ES 60.72

Record BY
Operator
21
SUBJOB RECORDER
S4000-C3S1-SUB CEMENT 117.22 tons
S4000-C3S1-SUB SAND 221.16 tons
S4000-C3S1-SUB STONE 279.26 tons
S4000-C3S1-SUB SIKA 204 24.50 kg
33003-C3S1-SUB SIKA 3006 ES 423.66 kg
33003-C3S1-SUB O-BASF 8320 444.61 kg
33003-C3S1-SUB SIKA LATEX POWER 0.00 kg
33003-C3S1-SUB
S400-C3S2-SUB UCY BP-01 UCY BP-02
S400-C3S2-SUB CEMENT 58.76 58.46
S400-C3S2-SUB SAND 106.49 114.67
S400-C3S2-SUB STONE 135.78 143.48
S4000-C3S2-SUB SIKA 204 0.00 24.50
S4000-C3S2-SUB SIKA 3006 ES 317.40 106.26
S4000-C3S2-SUB O-BASF 8320 56.96 387.65
S4000-C3S2-SUB SIKA LATEX POWER 0.00 0.00
28003-C3ML-SUB
28003-C3ML-SUB CP-0602
28003-C3ML-SUB
28003-C3ML-SUB UCY BP-01 UCY BP-02
20406-TRAFFICM CEMENT 50.97 10.12
20406-TRAFFICM SAND 90.86 18.04
20406-TRAFFICM STONE 116.78 23.17
20406-TRAFFICM SIKA 204 0.00 0.00
28001-SP-A-SUP SIKA 3006 ES 305.81 60.72
28001-SP-A-SUP O-BASF 8320 0.00 0.00
28001-SP-A-SUP
28001-SP-A-SUP
S4000-C3S4-SUB CP-07
S4000-C3S4-SUB
S4000-C3S4-SUB UCY BP-01 UCY BP-02
S4000-C3S4-SUB CEMENT 0.00 36.70
20103-TRAFFICM SAND 0.00 73.93
20103-TRAFFICM STONE 0.00 93.17
20103-TRAFFICM SIKA 204 0.00 0.00
20103-TRAFFICM SIKA 3006 ES 0.00 0.00
28001-SP-A-SUP O-BASF 8320 0.00 366.95
28001-SP-A-SUP
28001-SP-A-SUP
28001-SP-A-SUP CP-03&04
33003-C3S3-ARC
33003-C3S3-ARC UCY BP-01 UCY BP-02
33003-C3S3-ARC CEMENT 7.79 11.64
33003-C3S3-ARC SAND 15.63 22.70
CP-07 STONE 19.00 27.14
CP-07 SIKA 204 0.00 24.50
CP-07 SIKA 3006 ES 11.59 45.54
CP-07 O-BASF 8320 56.96 20.70
CP-0602 SIKA LATEX POWER 0.00 0.00
CP-0602
CP-0602
CP-0602
CP-0602
CP-0602
CP-0602
CP-0602

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 0.00 26.5 26.50
CP-07 0 89.50 89.50
CP-0602 110.8 22 132.80

total
117.22 tons
221.16 tons
279.26 tons
24.50 kg
423.66 kg
444.61 kg
0.00 kg

total
61.09 tons
108.90 tons
139.95 tons
0.00 kg
366.53 kg
0.00 kg

total
36.70 tons
73.93 tons
93.17 tons
0.00 kg
0.00 kg
366.95 kg
total
19.43 tons
38.33 tons
46.14 tons
24.50 kg
57.13 kg
77.66 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 16/03/2021
Summary RQ
DATE Plant RQ NO Material QTY
16/3/2021 UCY BP-01 286773 CEMENT 1.84
16/3/2021 UCY BP-01 286774 SAND 7.57
16/3/2021 UCY BP-01 286775 STONE 8.4
16/3/2021 UCY BP-01 286776 O-BASF 8320 18.4
16/3/2021 UCY BP-01 286777 CEMENT 0.92
16/3/2021 UCY BP-01 286778 SAND 1.67
16/3/2021 UCY BP-01 286779 STONE 2.07
16/3/2021 UCY BP-01 286780 O-BASF 8320 9.2
16/3/2021 UCY BP-01 286781 CEMENT 1.72
16/3/2021 UCY BP-01 286782 SAND 3.69
16/3/2021 UCY BP-01 286783 STONE 4.41
16/3/2021 UCY BP-01 286784 O-BASF 8320 15.5
16/3/2021 UCY BP-01 286785 CEMENT 1.38
16/3/2021 UCY BP-01 286786 SAND 2.51
16/3/2021 UCY BP-01 286787 STONE 3.1
16/3/2021 UCY BP-01 286788 SIKA 3006 ES 8.28
16/3/2021 UCY BP-01 286789 CEMENT 7.82
16/3/2021 UCY BP-01 286790 SAND 14.21
16/3/2021 UCY BP-01 286791 STONE 17.58
16/3/2021 UCY BP-01 286792 SIKA 3006 ES 46.92
16/3/2021 UCY BP-01 286793 CEMENT 18.705
16/3/2021 UCY BP-01 286794 SAND 37.76
16/3/2021 UCY BP-01 286795 STONE 45.5
16/3/2021 UCY BP-01 286796 O-BASF 8320 184.8
16/3/2021 UCY BP-02 286797 CEMENT 2.76
16/3/2021 UCY BP-02 286798 SAND 5.41
16/3/2021 UCY BP-02 286799 STONE 5.69
16/3/2021 UCY BP-02 286800 O-BASF 8320 25.3
16/3/2021 UCY BP-02 286487 CEMENT 2.1
16/3/2021 UCY BP-02 286488 SAND 5.23
16/3/2021 UCY BP-02 286489 STONE 6.53
16/3/2021 UCY BP-02 286490 SIKA 204 29.4
16/3/2021 UCY BP-02 CEMENT 36.7
16/3/2021 UCY BP-02 SAND 73.93
16/3/2021 UCY BP-02 STONE 93.71
16/3/2021 UCY BP-02 O-BASF 8320 366.95
16/3/2021 UCY BP-02 CEMENT 53.59
16/3/2021 UCY BP-02 SAND 94.95
16/3/2021 UCY BP-02 STONE 122.91
16/3/2021 UCY BP-02 SIKA 3006 ES 482.31
Record BY
Operator
21
SUBJOB RECORDER
S4000-C3S1-SUB CEMENT 127.54 tons
S4000-C3S1-SUB SAND 246.93 tons
S4000-C3S1-SUB STONE 309.90 tons
S4000-C3S1-SUB SIKA 204 29.40 kg
S4000-C3S3-SUB SIKA 3006 ES 537.51 kg
S4000-C3S3-SUB O-BASF 8320 620.15 kg
S4000-C3S3-SUB SIKA LATEX POWER 0.00 kg
S4000-C3S3-SUB
28003-C3ML-SUB UCY BP-01 UCY BP-02
28003-C3ML-SUB CEMENT 32.39 95.15
28003-C3ML-SUB SAND 67.41 179.52
28003-C3ML-SUB STONE 81.06 228.84
20103-TRAFFICM SIKA 204 0.00 29.40
20103-TRAFFICM SIKA 3006 ES 55.20 482.31
20103-TRAFFICM O-BASF 8320 227.90 392.25
20103-TRAFFICM SIKA LATEX POWER 0.00 0.00
28001-SP-A-SUP
28001-SP-A-SUP CP-0602
28001-SP-A-SUP
28001-SP-A-SUP UCY BP-01 UCY BP-02
S4000-C3S2-SUB CEMENT 0.00 53.59
S4000-C3S2-SUB SAND 0.00 94.95
S4000-C3S2-SUB STONE 0.00 122.91
S4000-C3S2-SUB SIKA 204 0.00 0.00
S4000-C3S4-SUB SIKA 3006 ES 0.00 482.31
S4000-C3S4-SUB O-BASF 8320 0.00 0.00
S4000-C3S4-SUB
S4000-C3S4-SUB
31002-C3S3-ARC CP-07
31002-C3S3-ARC
31002-C3S3-ARC UCY BP-01 UCY BP-02
31002-C3S3-ARC CEMENT 0.00 36.70
CP-07 SAND 0.00 73.93
CP-07 STONE 0.00 93.71
CP-07 SIKA 204 0.00 0.00
CP-07 SIKA 3006 ES 0.00 0.00
CP-0602 O-BASF 8320 0.00 366.95
CP-0602
CP-0602
CP-0602 CP-03&04
UCY BP-01 UCY BP-02
CEMENT 32.39 4.86
SAND 67.41 10.64
STONE 81.06 12.22
SIKA 204 0.00 29.40
SIKA 3006 ES 55.20 0.00
O-BASF 8320 227.90 25.30
SIKA LATEX POWER 0.00 0.00

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 0.00 12 12.00
CP-07 0 89.50 89.50
CP-0602 116.5 0 116.50

total
127.54 tons
246.93 tons
309.90 tons
29.40 kg
537.51 kg
620.15 kg
0.00 kg

total
53.59 tons
94.95 tons
122.91 tons
0.00 kg
482.31 kg
0.00 kg

total
36.70 tons
73.93 tons
93.71 tons
0.00 kg
0.00 kg
366.95 kg
total
37.25 tons
78.05 tons
93.28 tons
29.40 kg
55.20 kg
253.20 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 17/03/2021
Summary RQ
DATE Plant RQ NO Material QTY
17/3/2021 UCY BP-01 282793 CEMENT 0.92
17/3/2021 UCY BP-01 282794 SAND 3.78
17/3/2021 UCY BP-01 282795 STONE 4.2
17/3/2021 UCY BP-01 282796 O-BASF 8320 9.2
17/3/2021 UCY BP-01 282797 CEMENT 1.72
17/3/2021 UCY BP-01 282798 SAND 3.68
17/3/2021 UCY BP-01 282799 STONE 4.41
17/3/2021 UCY BP-01 282800 O-BASF 8320 15.5
17/3/2021 UCY BP-01 286491 CEMENT 1.01
17/3/2021 UCY BP-01 286492 SAND 1.84
17/3/2021 UCY BP-01 286493 STONE 2.27
17/3/2021 UCY BP-01 286494 SIKA 3006 ES 6.07
17/3/2021 UCY BP-02 286495 CEMENT 3.22
17/3/2021 UCY BP-02 286496 SAND 6.25
17/3/2021 UCY BP-02 286497 STONE 6.74
17/3/2021 UCY BP-02 286498 O-BASF 8320 29.9
17/3/2021 UCY BP-02 286499 CEMENT 1.38
17/3/2021 UCY BP-02 286500 SAND 2.51
17/3/2021 UCY BP-02 280699 STONE 3.1
17/3/2021 UCY BP-02 280700 SIKA 3006 ES 8.28
17/3/2021 UCY BP-02 - CEMENT 34.44
17/3/2021 UCY BP-02 - SAND 69.64
17/3/2021 UCY BP-02 - STONE 87.53
17/3/2021 UCY BP-02 - O-BASF 8320 344.4
17/3/2021 UCY BP-02 - CEMENT 62.77
17/3/2021 UCY BP-02 - SAND 183.64
17/3/2021 UCY BP-02 - STONE 144.52
17/3/2021 UCY BP-02 - SIKA 3006 ES 6.12
Record BY
Operator
21
SUBJOB RECORDER
S4000-C3S1-SUB CEMENT 105.46 tons
S4000-C3S1-SUB SAND 271.34 tons
S4000-C3S1-SUB STONE 252.77 tons
S4000-C3S1-SUB SIKA 204 0.00 kg
28003-C3ML-SUB SIKA 3006 ES 20.47 kg
28003-C3ML-SUB O-BASF 8320 399.00 kg
28003-C3ML-SUB SIKA LATEX POWER 0.00 kg
28003-C3ML-SUB
28001-SP-A-SUP UCY BP-01 UCY BP-02
28001-SP-A-SUP CEMENT 3.65 101.81
28001-SP-A-SUP SAND 9.30 262.04
28001-SP-A-SUP STONE 10.88 241.89
S4000-C3S4-SUB SIKA 204 0.00 0.00
S4000-C3S4-SUB SIKA 3006 ES 6.07 14.40
S4000-C3S4-SUB O-BASF 8320 24.70 374.30
S4000-C3S4-SUB SIKA LATEX POWER 0.00 0.00
20103-TRAFFICM
20103-TRAFFICM CP-0602
20103-TRAFFICM
20103-TRAFFICM UCY BP-01 UCY BP-02
CP-07 CEMENT 0.00 62.77
CP-07 SAND 0.00 183.64
CP-07 STONE 0.00 144.52
CP-07 SIKA 204 0.00 0.00
CP-0602 SIKA 3006 ES 0.00 6.12
CP-0602 O-BASF 8320 0.00 0.00
CP-0602
CP-0602
CP-07

UCY BP-01 UCY BP-02


CEMENT 0.00 34.44
SAND 0.00 69.64
STONE 0.00 87.53
SIKA 204 0.00 0.00
SIKA 3006 ES 0.00 0.00
O-BASF 8320 0.00 344.40

CP-03&04
UCY BP-01 UCY BP-02
CEMENT 3.65 4.60
SAND 9.30 8.76
STONE 10.88 9.84
SIKA 204 0.00 0.00
SIKA 3006 ES 6.07 8.28
O-BASF 8320 24.70 29.90
SIKA LATEX POWER 0.00 0.00

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 0.00 10 10.00
CP-07 0 84.00 84.00
CP-0602 136.9 0 136.90

total
105.46 tons
271.34 tons
252.77 tons
0.00 kg
20.47 kg
399.00 kg
0.00 kg

total
62.77 tons
183.64 tons
144.52 tons
0.00 kg
6.12 kg
0.00 kg

total
34.44 tons
69.64 tons
87.53 tons
0.00 kg
0.00 kg
344.40 kg
total
8.25 tons
18.06 tons
20.72 tons
0.00 kg
14.35 kg
54.60 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 18/03/2021
Summary RQ
DATE Plant RQ NO Material QTY
18/3/2021 UCY BP-01 288801 CEMENT 2.26
18/3/2021 UCY BP-01 288802 SAND 4.84
18/3/2021 UCY BP-01 288803 STONE 5.76
18/3/2021 UCY BP-01 288804 O-BASF 8320 20.3
18/3/2021 UCY BP-01 288805 CEMENT 1.23
18/3/2021 UCY BP-01 288806 SAND 2.64
18/3/2021 UCY BP-01 288807 STONE 3.14
18/3/2021 UCY BP-01 288808 O-BASF 8320 11.07
18/3/2021 UCY BP-01 288809 CEMENT 0.92
18/3/2021 UCY BP-01 288810 SAND 1.68
18/3/2021 UCY BP-01 288811 STONE 2.06
18/3/2021 UCY BP-01 288812 O-BASF 8320 9.2
18/3/2021 UCY BP-01 288813 CEMENT 0.92
18/3/2021 UCY BP-01 288814 SAND 3.8
18/3/2021 UCY BP-01 288815 STONE 4.19
18/3/2021 UCY BP-01 288816 O-BASF 8320 9.2
18/3/2021 UCY BP-01 288817 CEMENT 2.1
18/3/2021 UCY BP-01 288818 SAND 5.18
18/3/2021 UCY BP-01 288819 STONE 6.53
18/3/2021 UCY BP-01 288820 O-BASF 8320 29.4
18/3/2021 UCY BP-02 288821 CEMENT 15.35
18/3/2021 UCY BP-02 288822 SAND 31.11
18/3/2021 UCY BP-02 288823 STONE 37.15
18/3/2021 UCY BP-02 288824 O-BASF 8320 151.2
18/3/2021 UCY BP-02 288825 CEMENT 0.92
18/3/2021 UCY BP-02 288826 SAND 1.68
18/3/2021 UCY BP-02 288827 STONE 2.06
18/3/2021 UCY BP-02 288828 O-BASF 8320 9.2
18/3/2021 UCY BP-02 288829 CEMENT 1.26
18/3/2021 UCY BP-02 288830 SAND 3.17
18/3/2021 UCY BP-02 288831 STONE 3.67
18/3/2021 UCY BP-02 288832 O-BASF 8320 12.6
18/3/2021 UCY BP-02 288833 CEMENT 0.92
18/3/2021 UCY BP-02 288834 SAND 1.68
18/3/2021 UCY BP-02 288835 STONE 2.06
18/3/2021 UCY BP-02 288836 SIKA 3006 ES 5.52
18/3/2021 UCY BP-02 288837 CEMENT 1.11
18/3/2021 UCY BP-02 288838 SAND 2.38
18/3/2021 UCY BP-02 288839 STONE 2.83
18/3/2021 UCY BP-02 288840 O-BASF 8320 9.96
18/3/2021 UCY BP-01 CEMENT 7.38
18/3/2021 UCY BP-01 SAND 14.9
18/3/2021 UCY BP-01 STONE 18.65
18/3/2021 UCY BP-01 O-BASF 8320 73.8
18/3/2021 UCY BP-02 CEMENT 28.5
18/3/2021 UCY BP-02 SAND 57.89
18/3/2021 UCY BP-02 STONE 72.35
18/3/2021 UCY BP-02 O-BASF 8320 284.95
18/3/2021 UCY BP-01 CEMENT 32.2
18/3/2021 UCY BP-01 SAND 56.84
18/3/2021 UCY BP-01 STONE 73.99
18/3/2021 UCY BP-01 O-BASF 8481 289.8
18/3/2021 UCY BP-02 CEMENT 6.6
18/3/2021 UCY BP-02 SAND 13.74
18/3/2021 UCY BP-02 STONE 17.18
18/3/2021 UCY BP-02 SIKA 3006 ES 46.2

Record BY
Operator
21
SUBJOB RECORDER
28003-C3ML-SUB CEMENT 101.67 tons
28003-C3ML-SUB SAND 201.53 tons
28003-C3ML-SUB STONE 251.62 tons
28003-C3ML-SUB SIKA 204 0.00 kg
20103-TRAFFICM SIKA 3006 ES 51.72 kg
20103-TRAFFICM O-BASF 8320 620.88 kg
20103-TRAFFICM O-BASF 8481 289.80 kg
20103-TRAFFICM
28006-C3ML-SUB UCY BP-01 UCY BP-02
28006-C3ML-SUB CEMENT 47.01 54.66
28006-C3ML-SUB SAND 89.88 111.65
28006-C3ML-SUB STONE 114.32 137.30
S4000-C3S1-SUB SIKA 204 0.00 0.00
S4000-C3S1-SUB SIKA 3006 ES 0.00 51.72
S4000-C3S1-SUB O-BASF 8320 152.97 467.91
S4000-C3S1-SUB O-BASF 8481 289.80 0.00
31002-C3S3-SUB
31002-C3S3-SUB CP-0602
31002-C3S3-SUB
31002-C3S3-SUB UCY BP-01 UCY BP-02
S4000-C3S2-SUB CEMENT 32.20 6.60
S4000-C3S2-SUB SAND 56.84 13.74
S4000-C3S2-SUB STONE 73.99 17.18
S4000-C3S2-SUB SIKA 204 0.00 0.00
28006-C3ML-SUB SIKA 3006 ES 0.00 46.20
28006-C3ML-SUB O-BASF 8320 0.00 0.00
28006-C3ML-SUB O-BASF 8481 289.80 0.00
28006-C3ML-SUB
20106-TRAFFICM CP-07
20106-TRAFFICM
20106-TRAFFICM UCY BP-01 UCY BP-02
20106-TRAFFICM CEMENT 7.38 28.50
28001-SP-A-SUP SAND 14.90 57.89
28001-SP-A-SUP STONE 18.65 72.35
28001-SP-A-SUP SIKA 204 0.00 0.00
28001-SP-A-SUP SIKA 3006 ES 0.00 0.00
20103-TRAFFICM O-BASF 8320 73.80 284.95
20103-TRAFFICM
20103-TRAFFICM
20103-TRAFFICM CP-03&04
CP-07
CP-07 UCY BP-01 UCY BP-02
CP-07 CEMENT 7.43 19.56
CP-07 SAND 18.14 40.02
CP-07 STONE 21.68 47.77
CP-07 SIKA 204 0.00 0.00
CP-07 SIKA 3006 ES 0.00 5.52
CP-07 O-BASF 8320 79.17 182.96
CP-0602 SIKA LATEX POWER 0.00 0.00
CP-0602
CP-0602
CP-0602
CP-0602
CP-0602
CP-0602
CP-0602

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 20.50 46.7 67.20
CP-07 18 69.50 87.50
CP-0602 70 16.5 86.50

total
101.67 tons
201.53 tons
251.62 tons
0.00 kg
51.72 kg
620.88 kg
289.80 kg

total
38.80 tons
70.58 tons
91.17 tons
0.00 kg
46.20 kg
0.00 kg
289.80 kg

total
35.88 tons
72.79 tons
91.00 tons
0.00 kg
0.00 kg
358.75 kg
total
26.99 tons
58.16 tons
69.45 tons
0.00 kg
5.52 kg
262.13 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 19/03/2021
Summary RQ
DATE Plant RQ NO Material QTY
19/3/2021 UCY BP-01 288841 CEMENT 0.82
19/3/2021 UCY BP-01 288842 SAND 1.75
19/3/2021 UCY BP-01 288843 STONE 2.1
19/3/2021 UCY BP-01 288844 O-BASF 8320 7.38
19/3/2021 UCY BP-01 288845 CEMENT 0.37
19/3/2021 UCY BP-01 288846 SAND 0.67
19/3/2021 UCY BP-01 288847 STONE 0.83
19/3/2021 UCY BP-01 288848 SIKA 3006 ES 2.21
19/3/2021 UCY BP-02 288849 CEMENT 1.23
19/3/2021 UCY BP-02 288850 SAND 2.63
19/3/2021 UCY BP-02 288851 STONE 3.15
19/3/2021 UCY BP-02 288852 O-BASF 8320 11.07
19/3/2021 UCY BP-02 288853 CEMENT 1.35
19/3/2021 UCY BP-02 288854 SAND 2.89
19/3/2021 UCY BP-02 288855 STONE 3.46
19/3/2021 UCY BP-02 288856 SIKA 204 12.18
19/3/2021 UCY BP-02 288857 CEMENT 2.76
19/3/2021 UCY BP-02 288858 SAND 5
19/3/2021 UCY BP-02 288859 STONE 6.2
19/3/2021 UCY BP-02 288860 O-BASF 8320 27.6
19/3/2021 UCY BP-02 288861 CEMENT 0.55
19/3/2021 UCY BP-02 288862 SAND 1
19/3/2021 UCY BP-02 288863 STONE 1.24
19/3/2021 UCY BP-02 288864 O-BASF 8320 5.52
19/3/2021 UCY BP-02 288865 CEMENT 1.26
19/3/2021 UCY BP-02 288866 SAND 2.51
19/3/2021 UCY BP-02 288867 STONE 3.1
19/3/2021 UCY BP-02 288868 O-BASF 8320 12.6
19/3/2021 UCY BP-02 288869 CEMENT 1.5
19/3/2021 UCY BP-02 288870 SAND 6.14
19/3/2021 UCY BP-02 288871 STONE 6.82
19/3/2021 UCY BP-02 288872 O-BASF 8320 14.95
19/3/2021 UCY BP-02 288873 CEMENT 16.81
19/3/2021 UCY BP-02 288874 SAND 33.91
19/3/2021 UCY BP-02 288875 STONE 42.85
19/3/2021 UCY BP-02 288876 O-BASF 8320 168.1
19/3/2021 UCY BP-01 CEMENT 42.83
19/3/2021 UCY BP-01 SAND 75.78
19/3/2021 UCY BP-01 STONE 98.13
19/3/2021 UCY BP-01 O-BASF 8481 385.43
19/3/2021 UCY BP-02
19/3/2021 UCY BP-02
19/3/2021 UCY BP-02
19/3/2021 UCY BP-02

Record BY
Operator
21
SUBJOB RECORDER
24000-C3ML-SUB CEMENT 69.48 tons
24000-C3ML-SUB SAND 132.28 tons
24000-C3ML-SUB STONE 167.88 tons
24000-C3ML-SUB SIKA 204 12.18 kg
28001-SP-A-SUP SIKA 3006 ES 2.21 kg
28001-SP-A-SUP O-BASF 8320 247.22 kg
28001-SP-A-SUP SIKA LATEX POWER 0.00 kg
28001-SP-A-SUP
20103-TRAFFICM UCY BP-01 UCY BP-02
20103-TRAFFICM CEMENT 44.02 25.46
20103-TRAFFICM SAND 78.20 54.08
20103-TRAFFICM STONE 101.06 66.82
28003-C3ML-SUB SIKA 204 0.00 12.18
28003-C3ML-SUB SIKA 3006 ES 2.21 0.00
28003-C3ML-SUB O-BASF 8320 7.38 239.84
28003-C3ML-SUB SIKA LATEX POWER 0.00 0.00
S4000-C3S2-SUB
S4000-C3S2-SUB CP-0602
S4000-C3S2-SUB
S4000-C3S2-SUB UCY BP-01 UCY BP-02
S4000-C3S1-SUB CEMENT 42.83 0.00
S4000-C3S1-SUB SAND 75.78 0.00
S4000-C3S1-SUB STONE 98.13 0.00
S4000-C3S1-SUB SIKA 204 0.00 0.00
33003-C3S4-ARC SIKA 3006 ES 0.00 0.00
33003-C3S4-ARC O-BASF 8320 0.00 0.00
33003-C3S4-ARC
33003-C3S4-ARC
S4000-C3S1-SUB CP-07
S4000-C3S1-SUB
S4000-C3S1-SUB UCY BP-01 UCY BP-02
S4000-C3S1-SUB CEMENT 0.00 16.81
CP-07 SAND 0.00 33.91
CP-07 STONE 0.00 42.85
CP-07 SIKA 204 0.00 0.00
CP-07 SIKA 3006 ES 0.00 0.00
CP-0602 O-BASF 8320 0.00 168.10
CP-0602
CP-0602
CP-0602 CP-03&04
CP-0602
CP-0602 UCY BP-01 UCY BP-02
CP-0602 CEMENT 1.19 8.65
CP-0602 SAND 2.42 20.17
STONE 2.93 23.97
SIKA 204 0.00 12.18
SIKA 3006 ES 2.21 0.00
O-BASF 8320 7.38 71.74
SIKA LATEX POWER 0.00 0.00

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 0.00 23 23.00
CP-07 0 41.00 41.00
CP-0602 93.1 44 137.10

total
69.48 tons
132.28 tons
167.88 tons
12.18 kg
2.21 kg
247.22 kg
0.00 kg

total
42.83 tons
75.78 tons
98.13 tons
0.00 kg
0.00 kg
0.00 kg

total
16.81 tons
33.91 tons
42.85 tons
0.00 kg
0.00 kg
168.10 kg
total
9.84 tons
22.59 tons
26.90 tons
12.18 kg
2.21 kg
79.12 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 20/03/2021
Summary RQ
DATE Plant RQ NO Material QTY
20/3/2021 UCY BP-01 288901 CEMENT 2.34
20/3/2021 UCY BP-01 288902 SAND 4.98
20/3/2021 UCY BP-01 288903 STONE 5.98
20/3/2021 UCY BP-01 288904 O-BASF 8320 21.03
20/3/2021 UCY BP-01 288905 CEMENT 2.17
20/3/2021 UCY BP-01 288906 SAND 4.63
20/3/2021 UCY BP-01 288907 STONE 5.56
20/3/2021 UCY BP-01 288908 O-BASF 8320 19.56
20/3/2021 UCY BP-01 288909 CEMENT 0.84
20/3/2021 UCY BP-01 288910 SAND 1.68
20/3/2021 UCY BP-01 288911 STONE 2.07
20/3/2021 UCY BP-01 288912 O-BASF 8320 8.4
20/3/2021 UCY BP-01 288913 CEMENT 1.15
20/3/2021 UCY BP-01 288914 SAND 2.09
20/3/2021 UCY BP-01 288915 STONE 2.58
20/3/2021 UCY BP-01 288916 O-BASF 8320 11.5
20/3/2021 UCY BP-01 288917 CEMENT 1.5
20/3/2021 UCY BP-01 288918 SAND 6.16
20/3/2021 UCY BP-01 288919 STONE 6.82
20/3/2021 UCY BP-01 288920 O-BASF 8320 14.95
20/3/2021 UCY BP-01 288921 CEMENT 0.47
20/3/2021 UCY BP-01 288922 SAND 1.18
20/3/2021 UCY BP-01 288923 STONE 1.36
20/3/2021 UCY BP-01 288924 O-BASF 8320 4.68
20/3/2021 UCY BP-02 288925 CEMENT 15.19
20/3/2021 UCY BP-02 288926 SAND 34.36
20/3/2021 UCY BP-02 288927 STONE 40.41
20/3/2021 UCY BP-02 288928 O-BASF 8320 149.55
20/3/2021 UCY BP-01 CEMENT 9.43
20/3/2021 UCY BP-01 SAND 19.18
20/3/2021 UCY BP-01 STONE 24.04
20/3/2021 UCY BP-01 O-BASF 8320 94.3
20/3/2021 UCY BP-02 CEMENT 9.02
20/3/2021 UCY BP-02 SAND 18.35
20/3/2021 UCY BP-02 STONE 22.99
20/3/2021 UCY BP-02 O-BASF 8320 90.2
20/3/2021 UCY BP-01 CEMENT 25.31
20/3/2021 UCY BP-01 SAND 47.78
20/3/2021 UCY BP-01 STONE 60.46
20/3/2021 UCY BP-01 O-BASF 8481 230.48
Record BY
Operator
21
SUBJOB RECORDER
20103-TRAFFICM CEMENT 67.42 tons
20103-TRAFFICM SAND 140.39 tons
20103-TRAFFICM STONE 172.27 tons
20103-TRAFFICM SIKA 204 0.00 kg
28003-C3ML-SUB SIKA 3006 ES 0.00 kg
28003-C3ML-SUB O-BASF 8320 414.17 kg
28003-C3ML-SUB SIKA LATEX POWER 0.00 kg
28003-C3ML-SUB
33003-C3S1-ARC UCY BP-01 UCY BP-02
33003-C3S1-ARC CEMENT 43.21 24.21
33003-C3S1-ARC SAND 87.68 52.71
33003-C3S1-ARC STONE 108.87 63.40
28006-C3ML-SUB SIKA 204 0.00 0.00
28006-C3ML-SUB SIKA 3006 ES 0.00 0.00
28006-C3ML-SUB O-BASF 8320 174.42 239.75
28006-C3ML-SUB SIKA LATEX POWER 0.00 0.00
S4000-C3S1-SUB
S4000-C3S1-SUB CP-0602
S4000-C3S1-SUB
S4000-C3S1-SUB UCY BP-01 UCY BP-02
20106-TRAFFICM CEMENT 25.31 0.00
20106-TRAFFICM SAND 47.78 0.00
20106-TRAFFICM STONE 60.46 0.00
20106-TRAFFICM SIKA 204 0.00 0.00
S4000-C3S2-SUB SIKA 3006 ES 0.00 0.00
S4000-C3S2-SUB O-BASF 8320 0.00 0.00
S4000-C3S2-SUB
S4000-C3S2-SUB
CP-07 CP-07
CP-07
CP-07 UCY BP-01 UCY BP-02
CP-07 CEMENT 9.43 9.02
CP-07 SAND 19.18 18.35
CP-07 STONE 24.04 22.99
CP-07 SIKA 204 0.00 0.00
CP-07 SIKA 3006 ES 0.00 0.00
CP-0602 O-BASF 8320 94.30 90.20
CP-0602
CP-0602
CP-0602 CP-03&04
UCY BP-01 UCY BP-02
CEMENT 8.47 15.19
SAND 20.72 34.36
STONE 24.37 40.41
SIKA 204 0.00 0.00
SIKA 3006 ES 0.00 0.00
O-BASF 8320 80.12 149.55
SIKA LATEX POWER 0.00 0.00

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 23.30 39.5 62.80
CP-07 23 22.00 45.00
CP-0602 52.4 0 52.40

total
67.42 tons
140.39 tons
172.27 tons
0.00 kg
0.00 kg
414.17 kg
0.00 kg

total
25.31 tons
47.78 tons
60.46 tons
0.00 kg
0.00 kg
0.00 kg

total
18.45 tons
37.53 tons
47.03 tons
0.00 kg
0.00 kg
184.50 kg
total
23.66 tons
55.08 tons
64.78 tons
0.00 kg
0.00 kg
229.67 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 21/03/2021
Summary RQ
DATE Plant RQ NO Material QTY
21/3/2021 UCY BP-01 288929 CEMENT 1.23
21/3/2021 UCY BP-01 288930 SAND 2.63
21/3/2021 UCY BP-01 288931 STONE 3.14
21/3/2021 UCY BP-01 288932 O-BASF 8320 11.07
21/3/2021 UCY BP-01 288933 CEMENT 0.41
21/3/2021 UCY BP-01 288934 SAND 0.88
21/3/2021 UCY BP-01 288935 STONE 1.05
21/3/2021 UCY BP-01 288936 O-BASF 8320 3.69
21/3/2021 UCY BP-01 288937 CEMENT 15.35
21/3/2021 UCY BP-01 288938 SAND 31.04
21/3/2021 UCY BP-01 288939 STONE 37.15
21/3/2021 UCY BP-01 288940 O-BASF 8320 151.2
21/3/2021 UCY BP-02 288941 CEMENT 6.32
21/3/2021 UCY BP-02 288942 SAND 12.98
21/3/2021 UCY BP-02 288943 STONE 14.96
21/3/2021 UCY BP-02 288944 O-BASF 8320 60.9
21/3/2021 UCY BP-02 288945 CEMENT 1.23
21/3/2021 UCY BP-02 288946 SAND 2.63
21/3/2021 UCY BP-02 288947 STONE 3.14
21/3/2021 UCY BP-02 288948 O-BASF 8320 11.07
21/3/2021 UCY BP-02 288949 CEMENT 1.35
21/3/2021 UCY BP-02 288950 SAND 2.9
21/3/2021 UCY BP-02 288951 STONE 3.46
21/3/2021 UCY BP-02 288952 O-BASF 8320 12.18
21/3/2021 UCY BP-02 288953 CEMENT 15.78
21/3/2021 UCY BP-02 288954 SAND 34.72
21/3/2021 UCY BP-02 288955 STONE 41.9
21/3/2021 UCY BP-02 288956 O-BASF 8320 157.75
21/3/2021 UCY BP-02 288957 CEMENT 0.92
21/3/2021 UCY BP-02 288958 SAND 1.67
21/3/2021 UCY BP-02 288959 STONE 2.06
21/3/2021 UCY BP-02 288960 O-BASF 8320 9.2
21/3/2021 UCY BP-02 288961 CEMENT 0.69
21/3/2021 UCY BP-02 288962 SAND 1.26
21/3/2021 UCY BP-02 288963 STONE 1.55
21/3/2021 UCY BP-02 288964 O-BASF 8320 6.9
21/3/2021 UCY BP-02 288965 CEMENT 0.63
21/3/2021 UCY BP-02 288966 SAND 1.26
21/3/2021 UCY BP-02 288967 STONE 1.55
21/3/2021 UCY BP-02 288968 O-BASF 8320 6.3
21/3/2021 UCY BP-01 CEMENT 7.38
21/3/2021 UCY BP-01 SAND 14.69
21/3/2021 UCY BP-01 STONE 18.77
21/3/2021 UCY BP-01 O-BASF 8320 73.8
21/3/2021 UCY BP-02 CEMENT 33
21/3/2021 UCY BP-02 SAND 66.98
21/3/2021 UCY BP-02 STONE 84.12
21/3/2021 UCY BP-02 O-BASF 8320 330.05
21/3/2021 UCY BP-01 CEMENT 60.26
21/3/2021 UCY BP-01 SAND 106.5
21/3/2021 UCY BP-01 STONE 138.47
21/3/2021 UCY BP-01 O-BASF 8481 542.34
21/3/2021 UCY BP-02 CEMENT 6.28
21/3/2021 UCY BP-02 SAND 12.98
21/3/2021 UCY BP-02 STONE 16.2
21/3/2021 UCY BP-02 O-BASF 8481 43.96

Record BY
Operator
21
SUBJOB RECORDER
20103-TRAFFICM CEMENT 150.83 tons
20103-TRAFFICM SAND 293.12 tons
20103-TRAFFICM STONE 367.52 tons
20103-TRAFFICM SIKA 204 0.00 kg
28003-C3ML SUB SIKA 3006 ES 0.00 kg
28003-C3ML SUB O-BASF 8320 834.11 kg
28003-C3ML SUB SIKA LATEX POWER 0.00 kg
28003-C3ML SUB
S4000-C3S1-SUB UCY BP-01 UCY BP-02
S4000-C3S1-SUB CEMENT 84.63 66.20
S4000-C3S1-SUB SAND 155.74 137.38
S4000-C3S1-SUB STONE 198.58 168.94
S4000-C3S2-SUB SIKA 204 0.00 0.00
S4000-C3S2-SUB SIKA 3006 ES 0.00 0.00
S4000-C3S2-SUB O-BASF 8320 239.76 594.35
S4000-C3S2-SUB SIKA LATEX POWER 0.00 0.00
20103-TRAFFICM
20103-TRAFFICM CP-0602
20103-TRAFFICM
20103-TRAFFICM UCY BP-01 UCY BP-02
28003-C3ML SUB CEMENT 60.26 6.28
28003-C3ML SUB SAND 106.50 12.98
28003-C3ML SUB STONE 138.47 16.20
28003-C3ML SUB SIKA 204 0.00 0.00
S4000-C3S1-SUB SIKA 3006 ES 0.00 0.00
S4000-C3S1-SUB O-BASF 8320 0.00 0.00
S4000-C3S1-SUB
S4000-C3S1-SUB
28006-C3ML-SUB CP-07
28006-C3ML-SUB
28006-C3ML-SUB UCY BP-01 UCY BP-02
28006-C3ML-SUB CEMENT 7.38 33.00
S4000-C3S3-SUB SAND 14.69 66.98
S4000-C3S3-SUB STONE 18.77 84.12
S4000-C3S3-SUB SIKA 204 0.00 0.00
S4000-C3S3-SUB SIKA 3006 ES 0.00 0.00
33003-C3S2-ARC O-BASF 8320 73.80 330.05
33003-C3S2-ARC
33003-C3S2-ARC
33003-C3S2-ARC CP-03&04
CP-07
CP-07 UCY BP-01 UCY BP-02
CP-07 CEMENT 16.99 26.92
CP-07 SAND 34.55 57.42
CP-07 STONE 41.34 68.62
CP-07 SIKA 204 0.00 0.00
CP-07 SIKA 3006 ES 0.00 0.00
CP-07 O-BASF 8320 165.96 264.30
CP-0602 SIKA LATEX POWER 0.00 0.00
CP-0602
CP-0602
CP-0602
CP-0602
CP-0602
CP-0602
CP-0602

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 40.50 66.8 107.30
CP-07 18 80.50 98.50
CP-0602 131 15.7 146.70

total
150.83 tons
293.12 tons
367.52 tons
0.00 kg
0.00 kg
834.11 kg
0.00 kg

total
66.54 tons
119.48 tons
154.67 tons
0.00 kg
0.00 kg
0.00 kg

total
40.38 tons
81.67 tons
102.89 tons
0.00 kg
0.00 kg
403.85 kg
total
43.91 tons
91.97 tons
109.96 tons
0.00 kg
0.00 kg
430.26 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 22/03/2021
Summary RQ
DATE Plant RQ NO Material QTY
22/3/2021 UCY BP-01 288972 CEMENT 0.5
22/3/2021 UCY BP-01 288973 SAND 1.27
22/3/2021 UCY BP-01 288974 STONE 1.46
22/3/2021 UCY BP-01 288975 O-BASF 8320 5.04
22/3/2021 UCY BP-02 288976 CEMENT 1.97
22/3/2021 UCY BP-02 288977 SAND 4.22
22/3/2021 UCY BP-02 288978 STONE 5.05
22/3/2021 UCY BP-02 288979 O-BASF 8320 17.71
22/3/2021 UCY BP-02 288980 CEMENT 2.34
22/3/2021 UCY BP-02 288981 SAND 5.02
22/3/2021 UCY BP-02 288982 STONE 5.99
22/3/2021 UCY BP-02 288983 O-BASF 8320 21.04
22/3/2021 UCY BP-02 288984 CEMENT 2.3
22/3/2021 UCY BP-02 288985 SAND 9.5
22/3/2021 UCY BP-02 288986 STONE 10.46
22/3/2021 UCY BP-02 288987 O-BASF 8320 23
22/3/2021 UCY BP-02 288988 CEMENT 2.1
22/3/2021 UCY BP-02 288989 SAND 4.21
22/3/2021 UCY BP-02 288990 STONE 5.17
22/3/2021 UCY BP-02 288991 O-BASF 8320 21
22/3/2021 UCY BP-02 288992 CEMENT 9.05
22/3/2021 UCY BP-02 288993 SAND 18.48
22/3/2021 UCY BP-02 288994 STONE 21.74
22/3/2021 UCY BP-02 288995 O-BASF 8320 88.2
22/3/2021 UCY BP-02 288996 CEMENT 21.84
22/3/2021 UCY BP-02 288997 SAND 43.79
22/3/2021 UCY BP-02 288998 STONE 53.82
22/3/2021 UCY BP-02 288999 O-BASF 8320 218.4
22/3/2021 UCY BP-02 CEMENT 19.68
22/3/2021 UCY BP-02 SAND 39.98
22/3/2021 UCY BP-02 STONE 50.21
22/3/2021 UCY BP-02 O-BASF 8320 196.8
22/3/2021 UCY BP-02 CEMENT 74.46
22/3/2021 UCY BP-02 SAND 133.64
22/3/2021 UCY BP-02 STONE 172.57
22/3/2021 UCY BP-02 O-BASF 8481 657.64
Record BY
Operator
21
SUBJOB RECORDER
20106-TRAFFICM CEMENT 134.24 tons
20106-TRAFFICM SAND 260.11 tons
20106-TRAFFICM STONE 326.47 tons
20106-TRAFFICM SIKA 204 0.00 kg
28003-C3ML-SUB SIKA 3006 ES 0.00 kg
28003-C3ML-SUB O-BASF 8320 591.19 kg
28003-C3ML-SUB SIKA LATEX POWER 0.00 kg
28003-C3ML-SUB
20103-TRAFFICM UCY BP-01 UCY BP-02
20103-TRAFFICM CEMENT 0.50 133.74
20103-TRAFFICM SAND 1.27 258.84
20103-TRAFFICM STONE 1.46 325.01
S4000-C3S1-SUB SIKA 204 0.00 0.00
S4000-C3S1-SUB SIKA 3006 ES 0.00 0.00
S4000-C3S1-SUB O-BASF 8320 5.04 586.15
S4000-C3S1-SUB SIKA LATEX POWER 0.00 0.00
33003-C3S1-ARC
33003-C3S1-ARC CP-0602
33003-C3S1-ARC
33003-C3S1-ARC UCY BP-01 UCY BP-02
S4000-C3S2-SUB CEMENT 0.00 74.46
S4000-C3S2-SUB SAND 0.00 133.64
S4000-C3S2-SUB STONE 0.00 172.57
S4000-C3S2-SUB SIKA 204 0.00 0.00
S4000-C4S8-SUB SIKA 3006 ES 0.00 0.00
S4000-C4S8-SUB O-BASF 8320 0.00 0.00
S4000-C4S8-SUB
S4000-C4S8-SUB
CP-07 CP-07
CP-08
CP-09 UCY BP-01 UCY BP-02
CP-10 CEMENT 0.00 19.68
CP-0602 SAND 0.00 0.00
CP-0602 STONE 0.00 0.00
CP-0602 SIKA 204 0.00 0.00
CP-0602 SIKA 3006 ES 0.00 0.00
O-BASF 8320 0.00 0.00

CP-03&04
UCY BP-01 UCY BP-02
CEMENT 0.50 39.60
SAND 1.27 125.20
STONE 1.46 152.44
SIKA 204 0.00 0.00
SIKA 3006 ES 0.00 0.00
O-BASF 8320 5.04 586.15
SIKA LATEX POWER 0.00 0.00

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 0.00 99 99.00
CP-07 0 48.00 48.00
CP-0602 163.9 0 163.90

total
134.24 tons
260.11 tons
326.47 tons
0.00 kg
0.00 kg
591.19 kg
0.00 kg

total
74.46 tons
133.64 tons
172.57 tons
0.00 kg
0.00 kg
0.00 kg

total
19.68 tons
0.00 tons
0.00 tons
0.00 kg
0.00 kg
0.00 kg
total
40.10 tons
126.47 tons
153.90 tons
0.00 kg
0.00 kg
591.19 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 23/03/2021
Summary RQ
DATE Plant RQ NO Material QTY
23/3/2021 UCY BP-01 289001 CEMENT 1.64
23/3/2021 UCY BP-01 289002 SAND 3.5
23/3/2021 UCY BP-01 289003 STONE 4.19
23/3/2021 UCY BP-01 289004 O-BASF 8320 14.76
23/3/2021 UCY BP-01 289005 CEMENT 1.11
23/3/2021 UCY BP-01 289006 SAND 2.37
23/3/2021 UCY BP-01 289007 STONE 2.83
23/3/2021 UCY BP-01 289008 O-BASF 8320 9.96
23/3/2021 UCY BP-01 289009 CEMENT 0.92
23/3/2021 UCY BP-01 289010 SAND 1.67
23/3/2021 UCY BP-01 289011 STONE 2.06
23/3/2021 UCY BP-01 289012 O-BASF 8320 9.2
23/3/2021 UCY BP-01 289013 CEMENT 0.46
23/3/2021 UCY BP-01 289014 SAND 0.84
23/3/2021 UCY BP-01 289015 STONE 1.03
23/3/2021 UCY BP-01 289016 O-BASF 8320 4.6
23/3/2021 UCY BP-01 289017 CEMENT 1.38
23/3/2021 UCY BP-01 289018 SAND 2.5
23/3/2021 UCY BP-01 289019 STONE 3.1
23/3/2021 UCY BP-01 289020 O-BASF 8320 13.8
23/3/2021 UCY BP-01 289021 CEMENT 0.69
23/3/2021 UCY BP-01 289022 SAND 2.83
23/3/2021 UCY BP-01 289023 STONE 3.15
23/3/2021 UCY BP-01 289024 O-BASF 8320 6.9
23/3/2021 UCY BP-01 289025 CEMENT 2.07
23/3/2021 UCY BP-01 289026 SAND 8.51
23/3/2021 UCY BP-01 289027 STONE 9.43
23/3/2021 UCY BP-01 289028 O-BASF 8320 20.7
23/3/2021 UCY BP-01 289029 CEMENT 0.42
23/3/2021 UCY BP-01 289030 SAND 0.84
23/3/2021 UCY BP-01 289031 STONE 1.03
23/3/2021 UCY BP-01 289032 O-BASF 8320 4.2
23/3/2021 UCY BP-01 289033 CEMENT 0.83
23/3/2021 UCY BP-01 289034 SAND 1.5
23/3/2021 UCY BP-01 289035 STONE 1.86
23/3/2021 UCY BP-01 289036 SIKA 3006 ES 4.97
23/3/2021 UCY BP-02 289037 CEMENT 16.16
23/3/2021 UCY BP-02 289038 SAND 40.48
23/3/2021 UCY BP-02 289039 STONE 49.37
23/3/2021 UCY BP-02 289040 SIKA 204 222.95
23/3/2021 UCY BP-02 289041 CEMENT 1.11
23/3/2021 UCY BP-02 289042 SAND 2.37
23/3/2021 UCY BP-02 289043 STONE 2.83
23/3/2021 UCY BP-02 289044 O-BASF 8481 9.96
23/3/2021 UCY BP-02 289045 CEMENT 1.15
23/3/2021 UCY BP-02 289046 SAND 4.73
23/3/2021 UCY BP-02 289047 STONE 5.24
23/3/2021 UCY BP-02 289048 O-BASF 8481 11.5
23/3/2021 UCY BP-02 CEMENT 27.88
23/3/2021 UCY BP-02 SAND 56.79
23/3/2021 UCY BP-02 STONE 70.93
23/3/2021 UCY BP-02 O-BASF 8481 278.8
23/3/2021 UCY BP-01 CEMENT 64.71
23/3/2021 UCY BP-01 SAND 115.49
23/3/2021 UCY BP-01 STONE 149.86
23/3/2021 UCY BP-01 O-BASF 8481 571.87
23/3/2021 UCY BP-02 CEMENT 5.44
23/3/2021 UCY BP-02 SAND 11.25
23/3/2021 UCY BP-02 STONE 14.2
23/3/2021 UCY BP-02 O-BASF 8481 38.08

Record BY
Operator
21
SUBJOB RECORDER
24000-C3ML-SUB CEMENT 125.97 tons
24000-C3ML-SUB SAND 255.67 tons
24000-C3ML-SUB STONE 321.11 tons
24000-C3ML-SUB SIKA 204 222.95 kg
20103-TRAFFICM SIKA 3006 ES 4.97 kg
20103-TRAFFICM O-BASF 8320 84.12 kg
20103-TRAFFICM SIKA LATEX POWER 0.00 kg
20103-TRAFFICM
28006-C3ML-SUB UCY BP-01 UCY BP-02
28006-C3ML-SUB CEMENT 74.23 51.74
28006-C3ML-SUB SAND 140.05 115.62
28006-C3ML-SUB STONE 178.54 142.57
S4000-C3S4-SUB SIKA 204 0.00 222.95
S4000-C3S4-SUB SIKA 3006 ES 4.97 0.00
S4000-C3S4-SUB O-BASF 8320 84.12 0.00
S4000-C3S4-SUB SIKA LATEX POWER 0.00 0.00
S4000-C3S2-SUB
S4000-C3S2-SUB CP-0602
S4000-C3S2-SUB
S4000-C3S2-SUB UCY BP-01 UCY BP-02
S4000-C3S1-SUB CEMENT 64.71 5.44
S4000-C3S1-SUB SAND 115.49 11.25
S4000-C3S1-SUB STONE 149.86 14.20
S4000-C3S1-SUB SIKA 204 0.00 0.00
S4000-C3S3-SUB SIKA 3006 ES 0.00 0.00
S4000-C3S3-SUB O-BASF 8320 0.00 0.00
S4000-C3S3-SUB
S4000-C3S3-SUB
S4000-C3S1-SUB CP-07
S4000-C3S1-SUB
S4000-C3S1-SUB UCY BP-01 UCY BP-02
S4000-C3S1-SUB CEMENT 0.00 27.88
28001-SP-A-SUP SAND 0.00 56.79
28001-SP-A-SUP STONE 0.00 70.93
28001-SP-A-SUP SIKA 204 0.00 0.00
28001-SP-A-SUP SIKA 3006 ES 0.00 0.00
31002-C3S1-ARC O-BASF 8320 0.00 0.00
31002-C3S1-ARC
31002-C3S1-ARC
31002-C3S1-ARC CP-03&04
20103-TRAFFICM
20103-TRAFFICM UCY BP-01 UCY BP-02
20103-TRAFFICM CEMENT 9.52 18.42
20103-TRAFFICM SAND 24.56 47.58
S4000-C3S3-SUB STONE 28.68 57.44
S4000-C3S3-SUB SIKA 204 0.00 222.95
S4000-C3S3-SUB SIKA 3006 ES 4.97 0.00
S4000-C3S3-SUB O-BASF 8320 84.12 0.00
CP-07 SIKA LATEX POWER 0.00 0.00
CP-07
CP-07
CP-07
CP-0602
CP-0602
CP-0602
CP-0602
CP-0602
CP-0602
CP-0602
CP-0602

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 0.00 53.7 53.70
CP-07 0 68.00 68.00
CP-0602 141.9 13.6 155.50

total
125.97 tons
255.67 tons
321.11 tons
222.95 kg
4.97 kg
84.12 kg
0.00 kg

total
70.15 tons
126.74 tons
164.06 tons
0.00 kg
0.00 kg
0.00 kg

total
27.88 tons
56.79 tons
70.93 tons
0.00 kg
0.00 kg
0.00 kg
total
27.94 tons
72.14 tons
86.12 tons
222.95 kg
4.97 kg
84.12 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 24/03/2021
Summary RQ
DATE Plant RQ NO Material QTY
24/3/2021 UCY BP-01 289049 CEMENT 1.72
24/3/2021 UCY BP-01 289050 SAND 3.68
24/3/2021 UCY BP-01 289051 STONE 4.41
24/3/2021 UCY BP-01 289052 O-BASF 8320 15.5
24/3/2021 UCY BP-01 289053 CEMENT 1.23
24/3/2021 UCY BP-01 289054 SAND 2.63
24/3/2021 UCY BP-01 289055 STONE 3.14
24/3/2021 UCY BP-01 289056 O-BASF 8320 11.07
24/3/2021 UCY BP-01 289057 CEMENT 0.84
24/3/2021 UCY BP-01 289058 SAND 1.68
24/3/2021 UCY BP-01 289059 STONE 2.07
24/3/2021 UCY BP-01 289060 O-BASF 8320 8.4
24/3/2021 UCY BP-01 289061 CEMENT 16.17
24/3/2021 UCY BP-01 289062 SAND 32.38
24/3/2021 UCY BP-01 289063 STONE 39.85
24/3/2021 UCY BP-01 289064 O-BASF 8320 161.7
24/3/2021 UCY BP-02 289065 CEMENT 1.11
24/3/2021 UCY BP-02 289066 SAND 2.36
24/3/2021 UCY BP-02 289067 STONE 2.83
24/3/2021 UCY BP-02 289068 O-BASF 8320 9.96
24/3/2021 UCY BP-02 289069 CEMENT 0.41
24/3/2021 UCY BP-02 289070 SAND 0.88
24/3/2021 UCY BP-02 289071 STONE 1.05
24/3/2021 UCY BP-02 289072 O-BASF 8320 3.69
24/3/2021 UCY BP-02 289073 CEMENT 5.78
24/3/2021 UCY BP-02 289074 SAND 14.37
24/3/2021 UCY BP-02 289075 STONE 17.9
24/3/2021 UCY BP-02 289076 SIKA 204 80.85
24/3/2021 UCY BP-02 289077 CEMENT 1.5
24/3/2021 UCY BP-02 289078 SAND 6.14
24/3/2021 UCY BP-02 289079 STONE 6.81
24/3/2021 UCY BP-02 289080 O-BASF 8320 14.95
24/3/2021 UCY BP-02 289081 CEMENT 1.04
24/3/2021 UCY BP-02 289082 SAND 1.88
24/3/2021 UCY BP-02 289083 STONE 2.32
24/3/2021 UCY BP-02 289084 O-BASF 8320 10.35
24/3/2021 UCY BP-02 289085 CEMENT 0.21
24/3/2021 UCY BP-02 289086 SAND 0.42
24/3/2021 UCY BP-02 289087 STONE 0.52
24/3/2021 UCY BP-02 289088 O-BASF 8320 2.1
24/3/2021 UCY BP-02 289089 CEMENT 8.19
24/3/2021 UCY BP-02 289090 SAND 16.4
24/3/2021 UCY BP-02 289091 STONE 20.18
24/3/2021 UCY BP-02 289092 O-BASF 8320 81.9
24/3/2021 UCY BP-02 289093 CEMENT 0.23
24/3/2021 UCY BP-02 289094 SAND 0.8
24/3/2021 UCY BP-01 CEMENT 3.49
24/3/2021 UCY BP-01 SAND 6.96
24/3/2021 UCY BP-01 STONE 8.84
24/3/2021 UCY BP-01 O-BASF 8320 34.85
24/3/2021 UCY BP-02 CEMENT 7.38
24/3/2021 UCY BP-02 SAND 14.74
24/3/2021 UCY BP-02 STONE 18.72
24/3/2021 UCY BP-02 O-BASF 8320 73.8
24/3/2021 CEMENT 23.3
24/3/2021 SAND 42.99
24/3/2021 STONE 55.43
24/3/2021 O-BASF 8481 197.14
24/3/2021 CEMENT 38.96
24/3/2021 SAND 68.78
STONE 89.44
O-BASF 8481 350.66

Record BY
Operator
21
SUBJOB RECORDER
28003-C3ML-SUB CEMENT 111.56 tons
28003-C3ML-SUB SAND 217.09 tons
28003-C3ML-SUB STONE 273.51 tons
28003-C3ML-SUB SIKA 204 80.85 kg
20103-TRAFFICM SIKA 3006 ES 0.00 kg
20103-TRAFFICM O-BASF 8320 428.27 kg
20103-TRAFFICM SIKA LATEX POWER 0.00 kg
20103-TRAFFICM
33003-C3S4-SUB UCY BP-01 UCY BP-02
33003-C3S4-SUB CEMENT 23.45 25.85
33003-C3S4-SUB SAND 47.33 57.99
33003-C3S4-SUB STONE 58.31 70.33
S4000-C4S6-SUB SIKA 204 0.00 80.85
S4000-C4S6-SUB SIKA 3006 ES 0.00 0.00
S4000-C4S6-SUB O-BASF 8320 231.52 196.75
S4000-C4S6-SUB SIKA LATEX POWER 0.00 0.00
20103-TRAFFICM
20103-TRAFFICM CP-0602
20103-TRAFFICM
20103-TRAFFICM UCY BP-01 UCY BP-02
28003-C3ML-SUB CEMENT 0.00 0.00
28003-C3ML-SUB SAND 0.00 0.00
28003-C3ML-SUB STONE 0.00 0.00
28003-C3ML-SUB SIKA 204 0.00 0.00
31002-C3S1-ARC SIKA 3006 ES 0.00 0.00
31002-C3S1-ARC O-BASF 8320 0.00 0.00
31002-C3S1-ARC
31002-C3S1-ARC
S4000-C3S1-SUB CP-07
S4000-C3S1-SUB
S4000-C3S1-SUB UCY BP-01 UCY BP-02
S4000-C3S1-SUB CEMENT 3.49 7.38
28006-C3ML-SUB SAND 6.96 14.74
28006-C3ML-SUB STONE 8.84 18.72
28006-C3ML-SUB SIKA 204 0.00 0.00
28006-C3ML-SUB SIKA 3006 ES 0.00 0.00
S4000-C3S4-SUB O-BASF 8320 34.85 73.80
S4000-C3S4-SUB
S4000-C3S4-SUB
S4000-C3S4-SUB CP-03&04
S4000-C4S6-SUB
S4000-C4S6-SUB UCY BP-01 UCY BP-02
S4000-C4S6-SUB CEMENT 19.96 18.47
S4000-C4S6-SUB SAND 40.37 43.25
31002-C3S1-ARC STONE 49.47 51.61
31002-C3S1-ARC SIKA 204 0.00 80.85
CP-07 SIKA 3006 ES 0.00 0.00
CP-07 O-BASF 8320 196.67 122.95
CP-07 SIKA LATEX POWER 0.00 0.00
CP-07
CP-07
CP-07
CP-07
CP-07
CP-0602
CP-0602
CP-0602
CP-0602
CP-0602
CP-0602
CP-0602
CP-0602

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 47.70 49.45 97.15
CP-07 8.5 18.00 26.50
CP-0602 52.7 84.7 137.40

total
49.30 tons
105.32 tons
128.64 tons
80.85 kg
0.00 kg
428.27 kg
0.00 kg

total
0.00 tons
0.00 tons
0.00 tons
0.00 kg
0.00 kg
0.00 kg

total
10.87 tons
21.70 tons
27.56 tons
0.00 kg
0.00 kg
108.65 kg
total
38.43 tons
83.62 tons
101.08 tons
80.85 kg
0.00 kg
319.62 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 25/03/2021
Summary RQ
DATE Plant RQ NO Material QTY
25/3/2021 UCY BP-01 288873 CEMENT 27.53
25/3/2021 UCY BP-01 288874 SAND 68.58
25/3/2021 UCY BP-01 288875 STONE 84.79
25/3/2021 UCY BP-01 288876 SIKA 204 382.2
25/3/2021 UCY BP-02 288877 CEMENT 1.23
25/3/2021 UCY BP-02 288878 SAND 2.64
25/3/2021 UCY BP-02 288879 STONE 3.15
25/3/2021 UCY BP-02 288880 O-BASF 8320 11.07
25/3/2021 UCY BP-02 288881 CEMENT 2.17
25/3/2021 UCY BP-02 288882 SAND 4.66
25/3/2021 UCY BP-02 288883 STONE 5.56
25/3/2021 UCY BP-02 288884 O-BASF 8320 19.56
25/3/2021 UCY BP-02 288885 CEMENT 1.15
25/3/2021 UCY BP-02 288886 SAND 2.11
25/3/2021 UCY BP-02 288887 STONE 2.57
25/3/2021 UCY BP-02 288888 O-BASF 8320 11.5
25/3/2021 UCY BP-02 288889 CEMENT 0.97
25/3/2021 UCY BP-02 288890 SAND 2.93
25/3/2021 UCY BP-02 288891 STONE 3.34
25/3/2021 UCY BP-02 288892 O-BASF 8320 9.66
25/3/2021 UCY BP-02 288893 CEMENT 2.76
25/3/2021 UCY BP-02 288894 SAND 5.44
25/3/2021 UCY BP-02 288895 STONE 5.66
25/3/2021 UCY BP-02 288896 O-BASF 8320 25.3
25/3/2021 UCY BP-02 288897 CEMENT 0.84
25/3/2021 UCY BP-02 288898 SAND 1.68
25/3/2021 UCY BP-02 288899 STONE 2.07
25/3/2021 UCY BP-02 288900 O-BASF 8320 8.4
25/3/2021 UCY BP-02 289101 CEMENT 0.84
25/3/2021 UCY BP-02 289102 SAND 1.69
25/3/2021 UCY BP-02 289103 STONE 2.06
25/3/2021 UCY BP-02 289104 O-BASF 8320 8.4
25/3/2021 UCY BP-02 289105 CEMENT 0.97
25/3/2021 UCY BP-02 289106 SAND 2.3
25/3/2021 UCY BP-02 289107 STONE 3.87
25/3/2021 UCY BP-02 289108 O-BASF 8320 7.8
25/3/2021 UCY BP-02 289109 CEMENT 5.72
25/3/2021 UCY BP-02 289110 SAND 21
25/3/2021 UCY BP-02 289111 STONE 25.21
25/3/2021 UCY BP-02 289112 O-BASF 8320 54.25
25/3/2021 UCY BP-02 289113 CEMENT 0.43
25/3/2021 UCY BP-02 289114 SAND 1.09
25/3/2021 UCY BP-02 289115 STONE 1.26
25/3/2021 UCY BP-02 289116 O-BASF 8320 4.32
25/3/2021 UCY BP-01 CEMENT 9.84
25/3/2021 UCY BP-01 SAND 20.04
25/3/2021 UCY BP-01 STONE 25.1
25/3/2021 UCY BP-01 O-BASF 8320 98.4
25/3/2021 UCY BP-02 CEMENT 33.21
25/3/2021 UCY BP-02 SAND 67.64
25/3/2021 UCY BP-02 STONE 84.73
25/3/2021 UCY BP-02 O-BASF 8320 332.1
25/3/2021 UCY BP-01 CEMENT 42.92
25/3/2021 UCY BP-01 SAND 76.5
25/3/2021 UCY BP-01 STONE 98.34
25/3/2021 UCY BP-01 SIKA 3006 ES 257.51
25/3/2021 UCY BP-02 CEMENT 20.6
25/3/2021 UCY BP-02 SAND 39.3
25/3/2021 UCY BP-02 STONE 50.08
25/3/2021 UCY BP-02 O-BASF 8481 97.91
25/3/2021 UCY BP-02 SIKA 3006 ES 46.37

Record BY
Operator
21
SUBJOB RECORDER
33003-C3S4-SUB CEMENT 151.18 tons
33003-C3S4-SUB SAND 317.60 tons
33003-C3S4-SUB STONE 397.79 tons
33003-C3S4-SUB SIKA 204 382.20 kg
20103-TRAFFICM SIKA 3006 ES 303.88 kg
20103-TRAFFICM O-BASF 8320 590.76 kg
20103-TRAFFICM SIKA LATEX POWER 0.00 kg
20103-TRAFFICM
28003-C3ML-SUB UCY BP-01 UCY BP-02
28003-C3ML-SUB CEMENT 80.29 70.89
28003-C3ML-SUB SAND 165.12 152.48
28003-C3ML-SUB STONE 208.23 189.56
28006-C3ML-SUB SIKA 204 382.20 0.00
28006-C3ML-SUB SIKA 3006 ES 257.51 46.37
28006-C3ML-SUB O-BASF 8320 98.40 492.36
28006-C3ML-SUB SIKA LATEX POWER 0.00 0.00
S4000-C3S4-SUB
S4000-C3S4-SUB CP-0602
S4000-C3S4-SUB
S4000-C3S4-SUB UCY BP-01 UCY BP-02
S4000-C3S3-SUB CEMENT 42.92 20.60
S4000-C3S3-SUB SAND 76.50 39.30
S4000-C3S3-SUB STONE 98.34 50.08
S4000-C3S3-SUB SIKA 204 0.00 0.00
33003-C3S2-ARC SIKA 3006 ES 257.51 0.00
33003-C3S2-ARC O-BASF 8320 0.00 0.00
33003-C3S2-ARC
33003-C3S2-ARC
33003-C3S3-ARC CP-07
33003-C3S3-ARC
33003-C3S3-ARC UCY BP-01 UCY BP-02
33003-C3S3-ARC CEMENT 9.84 33.21
S4000-C3S1-SUB SAND 20.04 67.64
S4000-C3S1-SUB STONE 25.10 84.73
S4000-C3S1-SUB SIKA 204 0.00 0.00
S4000-C3S1-SUB SIKA 3006 ES 0.00 0.00
S4000-C3S2-SUB O-BASF 8320 98.40 332.10
S4000-C3S2-SUB
S4000-C3S2-SUB
S4000-C3S2-SUB CP-03&04
20106-TRAFFICM
20106-TRAFFICM UCY BP-01 UCY BP-02
20106-TRAFFICM CEMENT 27.53 17.08
20106-TRAFFICM SAND 68.58 45.54
CP-07 STONE 84.79 54.75
CP-07 SIKA 204 382.20 0.00
CP-07 SIKA 3006 ES 0.00 46.37
CP-07 O-BASF 8320 0.00 160.26
CP-07 SIKA LATEX POWER 0.00 0.00
CP-07
CP-07
CP-07
CP-0602
CP-0602
CP-0602
CP-0602
CP-0602
CP-0602
CP-0602
CP-0602
CP-0603

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 78.50 51.2 129.70
CP-07 24 81.00 105.00
CP-0602 93.3 47.7 141.00

total
151.18 tons
317.60 tons
397.79 tons
382.20 kg
303.88 kg
590.76 kg
0.00 kg

total
63.52 tons
115.80 tons
148.42 tons
0.00 kg
257.51 kg
0.00 kg

total
43.05 tons
87.68 tons
109.83 tons
0.00 kg
0.00 kg
430.50 kg
total
44.61 tons
114.12 tons
139.54 tons
382.20 kg
46.37 kg
160.26 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 26/03/2021
Summary RQ
DATE Plant RQ NO Material QTY
26/3/2021 UCY BP-01 289117 CEMENT 1.23
26/3/2021 UCY BP-01 289118 SAND 2.64
26/3/2021 UCY BP-01 289119 STONE 3.16
26/3/2021 UCY BP-01 289120 O-BASF 8320 11.07
26/3/2021 UCY BP-01 289121 CEMENT 0.41
26/3/2021 UCY BP-01 289122 SAND 0.88
26/3/2021 UCY BP-01 289123 STONE 1.05
26/3/2021 UCY BP-01 289124 O-BASF 8320 3.69
26/3/2021 UCY BP-01 289125 CEMENT 3.22
26/3/2021 UCY BP-01 289126 SAND 13.3
26/3/2021 UCY BP-01 289127 STONE 14.74
26/3/2021 UCY BP-01 289128 O-BASF 8320 32.2
26/3/2021 UCY BP-01 289129 CEMENT 2.96
26/3/2021 UCY BP-01 289130 SAND 6.29
26/3/2021 UCY BP-01 289131 STONE 6.73
26/3/2021 UCY BP-01 289132 O-BASF 8320 27.3
26/3/2021 UCY BP-02 289133 CEMENT 2.73
26/3/2021 UCY BP-02 289134 SAND 5.49
26/3/2021 UCY BP-02 289135 STONE 6.73
26/3/2021 UCY BP-02 289136 O-BASF 8320 27.3
Record BY
Operator
21
SUBJOB RECORDER
20103-TRAFFICM CEMENT 10.55 tons
20103-TRAFFICM SAND 28.60 tons
20103-TRAFFICM STONE 32.41 tons
20103-TRAFFICM SIKA 204 0.00 kg
28003-C3ML-SUB SIKA 3006 ES 0.00 kg
28003-C3ML-SUB O-BASF 8320 101.56 kg
28003-C3ML-SUB SIKA LATEX POWER 0.00 kg
28003-C3ML-SUB
S4000-C3S1-SUB UCY BP-01 UCY BP-02
S4000-C3S1-SUB CEMENT 7.82 2.73
S4000-C3S1-SUB SAND 23.11 5.49
S4000-C3S1-SUB STONE 25.68 6.73
S4000-C3S3-SUB SIKA 204 0.00 0.00
S4000-C3S3-SUB SIKA 3006 ES 0.00 0.00
S4000-C3S3-SUB O-BASF 8320 74.26 27.30
S4000-C3S3-SUB SIKA LATEX POWER 0.00 0.00
S4000-C3S3-SUB
S4000-C3S3-SUB CP-0602
S4000-C3S3-SUB
S4000-C3S3-SUB UCY BP-01 UCY BP-02
CEMENT 0.00 0.00
SAND 0.00 0.00
STONE 0.00 0.00
SIKA 204 0.00 0.00
SIKA 3006 ES 0.00 0.00
O-BASF 8320 0.00 0.00

CP-07

UCY BP-01 UCY BP-02


CEMENT 0.00 0.00
SAND 0.00 0.00
STONE 0.00 0.00
SIKA 204 0.00 0.00
SIKA 3006 ES 0.00 0.00
O-BASF 8320 0.00 0.00

CP-03&04
UCY BP-01 UCY BP-02
CEMENT 7.82 2.73
SAND 23.11 5.49
STONE 25.68 6.73
SIKA 204 0.00 0.00
SIKA 3006 ES 0.00 0.00
O-BASF 8320 74.26 27.30
SIKA LATEX POWER 0.00 0.00

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 0.00
CP-07 0.00
CP-0602 0.00

total
10.55 tons
28.60 tons
32.41 tons
0.00 kg
0.00 kg
101.56 kg
0.00 kg

total
0.00 tons
0.00 tons
0.00 tons
0.00 kg
0.00 kg
0.00 kg

total
0.00 tons
0.00 tons
0.00 tons
0.00 kg
0.00 kg
0.00 kg
total
10.55 tons
28.60 tons
32.41 tons
0.00 kg
0.00 kg
101.56 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 27/03/2021
Summary RQ
DATE Plant RQ NO Material QTY
27/3/2021 UCY BP-01 289137 CEMENT 1.29
27/3/2021 UCY BP-01 289138 SAND 2.35
27/3/2021 UCY BP-01 289139 STONE 2.9
27/3/2021 UCY BP-01 289140 SIKA 3006 ES 7.73
27/3/2021 UCY BP-01 289141 CEMENT 0.21
27/3/2021 UCY BP-01 289142 SAND 0.42
27/3/2021 UCY BP-01 289143 STONE 0.52
27/3/2021 UCY BP-01 289144 O-BASF 8320 2.1
27/3/2021 UCY BP-01 289145 CEMENT 54.6
27/3/2021 UCY BP-01 289146 SAND 110.24
27/3/2021 UCY BP-01 289147 STONE 134.16
27/3/2021 UCY BP-01 289148 O-BASF 8320 546
27/3/2021 UCY BP-02 289149 CEMENT 9.96
27/3/2021 UCY BP-02 289150 SAND 25.56
27/3/2021 UCY BP-02 289151 STONE 28.81
27/3/2021 UCY BP-02 289152 SIKA 204 129.85
27/3/2021 UCY BP-02 289153 CEMENT 1.23
27/3/2021 UCY BP-02 289154 SAND 2.64
27/3/2021 UCY BP-02 289155 STONE 3.16
27/3/2021 UCY BP-02 289156 O-BASF 8320 11.07
27/3/2021 UCY BP-02 289157 CEMENT 0.41
27/3/2021 UCY BP-02 289158 SAND 0.88
27/3/2021 UCY BP-02 289159 STONE 1.05
27/3/2021 UCY BP-02 289160 O-BASF 8320 3.69
27/3/2021 UCY BP-02 289161 CEMENT 1.04
27/3/2021 UCY BP-02 289162 SAND 1.89
27/3/2021 UCY BP-02 289163 STONE 2.33
27/3/2021 UCY BP-02 289164 O-BASF 8320 10.35
27/3/2021 UCY BP-02 289165 CEMENT 0.32
27/3/2021 UCY BP-02 289166 SAND 1.33
27/3/2021 UCY BP-02 289167 STONE 1.47
27/3/2021 UCY BP-02 289168 O-BASF 8320 3.22
27/3/2021 UCY BP-02 289169 CEMENT 0.58
27/3/2021 UCY BP-02 289170 SAND 2.37
27/3/2021 UCY BP-02 289171 STONE 2.63
27/3/2021 UCY BP-02 289172 O-BASF 8320 5.75
27/3/2021 UCY BP-02 289173 CEMENT 2.76
27/3/2021 UCY BP-02 289174 SAND 11.39
27/3/2021 UCY BP-02 289175 STONE 12.64
27/3/2021 UCY BP-02 289176 O-BASF 8320 27.6
27/3/2021 UCY BP-02 289177 CEMENT 46.41
27/3/2021 UCY BP-02 289178 SAND 93.7
27/3/2021 UCY BP-02 289179 STONE 114.04
27/3/2021 UCY BP-02 289180 O-BASF 8320 464.1
27/3/2021 UCY BP-01 CEMENT 9.02
27/3/2021 UCY BP-01 SAND 17.91
27/3/2021 UCY BP-01 STONE 22.92
27/3/2021 UCY BP-01 SIKA 204 99.22
27/3/2021 UCY BP-02 CEMENT 30.75
27/3/2021 UCY BP-02 SAND 62.4
27/3/2021 UCY BP-02 STONE 79.05
27/3/2021 UCY BP-02 O-BASF 8320 202.95
27/3/2021 UCY BP-02 SIKA 204 135.3
27/3/2021 UCY BP-02 CEMENT 0.69
27/3/2021 UCY BP-02 SAND 1.19
27/3/2021 UCY BP-02 STONE 1.59
27/3/2021 UCY BP-02 O-BASF 8481 6.21

Record BY
Operator
21
SUBJOB RECORDER
28001-TRAFFICM CEMENT 159.27 tons
28001-TRAFFICM SAND 334.27 tons
28001-TRAFFICM STONE 407.27 tons
28001-TRAFFICM SIKA 204 364.37 kg
S4000-C3S1-SUB SIKA 3006 ES 7.73 kg
S4000-C3S1-SUB O-BASF 8320 1276.83 kg
S4000-C3S1-SUB SIKA LATEX POWER 0.00 kg
S4000-C3S1-SUB
S4000-C4S5-SUB UCY BP-01 UCY BP-02
S4000-C4S5-SUB CEMENT 65.12 94.15
S4000-C4S5-SUB SAND 130.92 203.35
S4000-C4S5-SUB STONE 160.50 246.77
31002-C3S1-ARC SIKA 204 99.22 265.15
31002-C3S1-ARC SIKA 3006 ES 7.73 0.00
31002-C3S1-ARC O-BASF 8320 548.10 728.73
31002-C3S1-ARC SIKA LATEX POWER 0.00 0.00
20103-TRAFFICM
20103-TRAFFICM CP-0602
20103-TRAFFICM
20103-TRAFFICM UCY BP-01 UCY BP-02
28003-C3ML-SUB CEMENT 0.00 0.69
28003-C3ML-SUB SAND 0.00 1.19
28003-C3ML-SUB STONE 0.00 1.59
28003-C3ML-SUB SIKA 204 0.00 0.00
28006-C3ML-SUB SIKA 3006 ES 0.00 0.00
28006-C3ML-SUB O-BASF 8320 0.00 0.00
28006-C3ML-SUB
28006-C3ML-SUB
20106-TRAFFICM CP-07
20106-TRAFFICM
20106-TRAFFICM UCY BP-01 UCY BP-02
20106-TRAFFICM CEMENT 9.02 30.75
S4000-C3S4-SUB SAND 17.91 62.40
S4000-C3S4-SUB STONE 22.92 79.05
S4000-C3S4-SUB SIKA 204 99.22 135.30
S4000-C3S4-SUB SIKA 3006 ES 0.00 0.00
S4000-C3S1-SUB O-BASF 8320 0.00 202.95
S4000-C3S1-SUB
S4000-C3S1-SUB
S4000-C3S1-SUB CP-03&04
S4000-C4S5-SUB
S4000-C4S5-SUB UCY BP-01 UCY BP-02
S4000-C4S5-SUB CEMENT 56.10 62.71
S4000-C4S5-SUB SAND 113.01 139.76
CP-07 STONE 137.58 166.13
CP-07 SIKA 204 0.00 129.85
CP-07 SIKA 3006 ES 7.73 0.00
CP-07 O-BASF 8320 548.10 525.78
CP-07 SIKA LATEX POWER 0.00 0.00
CP-07
CP-07
CP-07
CP-07
CP-0602
CP-0602
CP-0602
CP-0602

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 133.30 160.65 293.95
CP-07 22 75.00 97.00
CP-0602 0 1.5 1.50

total
159.27 tons
334.27 tons
407.27 tons
364.37 kg
7.73 kg
1276.83 kg
0.00 kg

total
0.69 tons
1.19 tons
1.59 tons
0.00 kg
0.00 kg
0.00 kg

total
39.77 tons
80.31 tons
101.97 tons
234.52 kg
0.00 kg
202.95 kg
total
118.81 tons
252.77 tons
303.71 tons
129.85 kg
7.73 kg
1073.88 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 28/03/2021
Summary RQ
DATE Plant RQ NO Material QTY
28/3/2021 UCY BP-01 289181 CEMENT 1.29
28/3/2021 UCY BP-01 289182 SAND 2.38
28/3/2021 UCY BP-01 289183 STONE 2.91
28/3/2021 UCY BP-01 289184 SIKA 3006 ES 7.73
28/3/2021 UCY BP-01 289185 CEMENT 62.79
28/3/2021 UCY BP-01 289186 SAND 124.68
28/3/2021 UCY BP-01 289187 STONE 153.84
28/3/2021 UCY BP-01 289188 O-BASF 8320 627.9
28/3/2021 UCY BP-02 289189 CEMENT 1.23
28/3/2021 UCY BP-02 289190 SAND 2.68
28/3/2021 UCY BP-02 289191 STONE 3.17
28/3/2021 UCY BP-02 289192 O-BASF 8320 11.07
28/3/2021 UCY BP-02 289193 CEMENT 0.41
28/3/2021 UCY BP-02 289194 SAND 0.89
28/3/2021 UCY BP-02 289195 STONE 1.06
28/3/2021 UCY BP-02 289196 O-BASF 8320 3.69
28/3/2021 UCY BP-02 289197 CEMENT 0.46
28/3/2021 UCY BP-02 289198 SAND 0.85
28/3/2021 UCY BP-02 289199 STONE 1.04
28/3/2021 UCY BP-02 289200 O-BASF 8320 4.6
28/3/2021 UCY BP-02 289801 CEMENT 6.21
28/3/2021 UCY BP-02 289802 SAND 25.97
28/3/2021 UCY BP-02 289803 STONE 28.49
28/3/2021 UCY BP-02 289804 O-BASF 8320 62.1
28/3/2021 UCY BP-02 289805 CEMENT 8.19
28/3/2021 UCY BP-02 289806 SAND 12.26
28/3/2021 UCY BP-02 289807 STONE 20.07
28/3/2021 UCY BP-02 289808 O-BASF 8320 81.9
28/3/2021 UCY BP-02 289809 CEMENT 0.84
28/3/2021 UCY BP-02 289810 SAND 1.67
28/3/2021 UCY BP-02 289811 STONE 2.06
28/3/2021 UCY BP-02 289812 O-BASF 8320 8.4
28/3/2021 UCY BP-02 289813 CEMENT 0.29
28/3/2021 UCY BP-02 289814 SAND 0.58
28/3/2021 UCY BP-02 289815 STONE 0.72
28/3/2021 UCY BP-02 289816 O-BASF 8320 2.94
28/3/2021 UCY BP-02 289817 CEMENT 62.79
28/3/2021 UCY BP-02 289818 SAND 124.68
28/3/2021 UCY BP-02 289819 STONE 153.84
28/3/2021 UCY BP-02 289820 O-BASF 8320 627.9
28/3/2021 UCY BP-02 CEMENT 16.2
28/3/2021 UCY BP-02 SAND 32.63
28/3/2021 UCY BP-02 STONE 41.48
28/3/2021 UCY BP-02 O-BASF 8320 98.4
28/3/2021 UCY BP-02 SIKA 204 69.91
28/3/2021 UCY BP-01 CEMENT 35
28/3/2021 UCY BP-01 SAND 65.84
27/3/2021 UCY BP-01 STONE 83.68
27/3/2021 UCY BP-01 SIKA 3006 ES 175.34

Record BY
Operator
21
SUBJOB RECORDER
28001-SP-A-SUP CEMENT 195.70 tons
28001-SP-A-SUP SAND 395.11 tons
28001-SP-A-SUP STONE 492.36 tons
28001-SP-A-SUP SIKA 204 69.91 kg
S4000-C4S5-SUB SIKA 3006 ES 183.07 kg
S4000-C4S5-SUB O-BASF 8320 1528.90 kg
S4000-C4S5-SUB SIKA LATEX POWER 0.00 kg
S4000-C4S5-SUB
20103-TRAFFICM UCY BP-01 UCY BP-02
20103-TRAFFICM CEMENT 99.08 96.62
20103-TRAFFICM SAND 192.90 202.21
20103-TRAFFICM STONE 240.43 251.93
28003-C3ML-SUB SIKA 204 0.00 69.91
28003-C3ML-SUB SIKA 3006 ES 183.07 0.00
28003-C3ML-SUB O-BASF 8320 627.90 901.00
28003-C3ML-SUB SIKA LATEX POWER 0.00 0.00
S4000-C3S3-SUB
S4000-C3S3-SUB CP-0602
S4000-C3S3-SUB
S4000-C3S3-SUB UCY BP-01 UCY BP-02
S4000-C3S2-SUB CEMENT 35.00 0.00
S4000-C3S2-SUB SAND 65.84 0.00
S4000-C3S2-SUB STONE 83.68 0.00
S4000-C3S2-SUB SIKA 204 0.00 0.00
S4000-C4S5-SUB SIKA 3006 ES 175.34 0.00
S4000-C4S5-SUB O-BASF 8320 0.00 0.00
S4000-C4S5-SUB
S4000-C4S5-SUB
33003-C3S2-ARC CP-07
33003-C3S2-ARC
33003-C3S2-ARC UCY BP-01 UCY BP-02
33003-C3S2-ARC CEMENT 0.00 16.20
S4000-C3S1-SUB SAND 0.00 32.63
S4000-C3S1-SUB STONE 0.00 41.48
S4000-C3S1-SUB SIKA 204 0.00 69.91
S4000-C3S1-SUB SIKA 3006 ES 0.00 0.00
S4000-C4S9-SUB O-BASF 8320 0.00 98.40
S4000-C4S9-SUB
S4000-C4S9-SUB
S4000-C4S9-SUB CP-03&04
CP-07
CP-07 UCY BP-01 UCY BP-02
CP-07 CEMENT 64.08 80.42
CP-07 SAND 127.06 169.58
CP-07 STONE 156.75 210.45
CP-0602 SIKA 204 0.00 0.00
CP-0602 SIKA 3006 ES 7.73 0.00
CP-0602 O-BASF 8320 627.90 802.60
CP-0602 SIKA LATEX POWER 0.00 0.00

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 0.00 203.7 203.70
CP-07 0 39.50 39.50
CP-0602 79.3 0 79.30

total
195.70 tons
395.11 tons
492.36 tons
69.91 kg
183.07 kg
1528.90 kg
0.00 kg

total
35.00 tons
65.84 tons
83.68 tons
0.00 kg
175.34 kg
0.00 kg

total
16.20 tons
32.63 tons
41.48 tons
69.91 kg
0.00 kg
98.40 kg
total
144.50 tons
296.64 tons
367.20 tons
0.00 kg
7.73 kg
1430.50 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 29/03/2021
Summary RQ
DATE Plant RQ NO Material QTY
29/3/2021 UCY BP-01 289821 CEMENT 1.29
29/3/2021 UCY BP-01 289822 SAND 2.35
29/3/2021 UCY BP-01 289823 STONE 2.89
29/3/2021 UCY BP-01 289824 SIKA 3006 ES 7.73
29/3/2021 UCY BP-02 289825 CEMENT 3.03
29/3/2021 UCY BP-02 289826 SAND 7.77
29/3/2021 UCY BP-02 289827 STONE 8.7
29/3/2021 UCY BP-02 289828 SIKA 204 39.2
29/3/2021 UCY BP-02 289829 CEMENT 1.23
29/3/2021 UCY BP-02 289830 SAND 2.64
29/3/2021 UCY BP-02 289831 STONE 3.14
29/3/2021 UCY BP-02 289832 O-BASF 8320 11.07
29/3/2021 UCY BP-02 289833 CEMENT 4.52
29/3/2021 UCY BP-02 289834 SAND 16.37
29/3/2021 UCY BP-02 289835 STONE 19.82
29/3/2021 UCY BP-02 289836 O-BASF 8320 42.6
29/3/2021 UCY BP-02 289837 CEMENT 0.88
29/3/2021 UCY BP-02 289838 SAND 3.62
29/3/2021 UCY BP-02 289839 STONE 3.98
29/3/2021 UCY BP-02 289840 O-BASF 8320 8.74
29/3/2021 UCY BP-02 289841 CEMENT 2.42
29/3/2021 UCY BP-02 289842 SAND 9.98
29/3/2021 UCY BP-02 289843 STONE 10.99
29/3/2021 UCY BP-02 289844 O-BASF 8320 24.15
29/3/2021 UCY BP-02 289845 CEMENT 1.61
29/3/2021 UCY BP-02 289846 SAND 2.94
29/3/2021 UCY BP-02 289847 STONE 3.61
29/3/2021 UCY BP-02 289848 O-BASF 8320 16.1
29/3/2021 UCY BP-02 289849 CEMENT 0.84
29/3/2021 UCY BP-02 289850 SAND 1.69
29/3/2021 UCY BP-02 289851 STONE 2.06
29/3/2021 UCY BP-02 289852 O-BASF 8320 8.4
29/3/2021 UCY BP-02 289853 CEMENT 0.84
29/3/2021 UCY BP-02 289854 SAND 1.69
29/3/2021 UCY BP-02 289855 STONE 2.06
29/3/2021 UCY BP-02 289856 O-BASF 8320 8.4
29/3/2021 UCY BP-02 289857 CEMENT 1.05
29/3/2021 UCY BP-02 289858 SAND 2.11
29/3/2021 UCY BP-02 289859 STONE 2.58
29/3/2021 UCY BP-02 289860 O-BASF 8320 10.5
29/3/2021 UCY BP-02 289861 CEMENT 1.26
29/3/2021 UCY BP-02 289862 SAND 2.53
29/3/2021 UCY BP-02 289863 STONE 3.09
29/3/2021 UCY BP-02 289864 O-BASF 8320 12.6
29/3/2021 UCY BP-02 289865 CEMENT 1.44
29/3/2021 UCY BP-02 289866 SAND 3.63
29/3/2021 UCY BP-02 289867 STONE 4.19
29/3/2021 UCY BP-02 289868 O-BASF 8320 14.4
29/3/2021 UCY BP-02 CEMENT 13.04
29/3/2021 UCY BP-02 SAND 26.52
29/3/2021 UCY BP-02 STONE 38.23
29/3/2021 UCY BP-02 O-BASF 8320 130.38
29/3/2021 UCY BP-01 CEMENT 54.56
29/3/2021 UCY BP-01 SAND 99.04
29/3/2021 UCY BP-01 STONE 126.38
29/3/2021 UCY BP-01 SIKA 3006 ES 320.52

Record BY
Operator
21
SUBJOB RECORDER
28001-SP-A-SUP CEMENT 88.01 tons
28001-SP-A-SUP SAND 182.88 tons
28001-SP-A-SUP STONE 231.72 tons
28001-SP-A-SUP SIKA 204 39.20 kg
33003-C3S2-ARC SIKA 3006 ES 328.25 kg
33003-C3S2-ARC O-BASF 8320 287.34 kg
33003-C3S2-ARC SIKA LATEX POWER 0.00 kg
33003-C3S2-ARC
20103-TRAFFICM UCY BP-01 UCY BP-02
20103-TRAFFICM CEMENT 55.85 32.16
20103-TRAFFICM SAND 101.39 81.49
20103-TRAFFICM STONE 129.27 102.45
S4000-C3S2-SUB SIKA 204 0.00 39.20
S4000-C3S2-SUB SIKA 3006 ES 328.25 0.00
S4000-C3S2-SUB O-BASF 8320 0.00 287.34
S4000-C3S2-SUB SIKA LATEX POWER 0.00 0.00
S4000-C3S4-SUB
S4000-C3S4-SUB CP-0602
S4000-C3S4-SUB
S4000-C3S4-SUB UCY BP-01 UCY BP-02
S4000-C3S3-SUB CEMENT 54.56 0.00
S4000-C3S3-SUB SAND 99.04 0.00
S4000-C3S3-SUB STONE 126.38 0.00
S4000-C3S3-SUB SIKA 204 0.00 0.00
28006-C3ML-SUB SIKA 3006 ES 320.52 0.00
28006-C3ML-SUB O-BASF 8320 0.00 0.00
28006-C3ML-SUB
28006-C3ML-SUB
33003-C3S2-ARC CP-07
33003-C3S2-ARC
33003-C3S2-ARC UCY BP-01 UCY BP-02
33003-C3S2-ARC CEMENT 0.00 13.04
33003-C3S4-ARC SAND 0.00 26.52
33003-C3S4-ARC STONE 0.00 38.23
33003-C3S4-ARC SIKA 204 0.00 0.00
33003-C3S4-ARC SIKA 3006 ES 0.00 0.00
33003-C3S3-ARC O-BASF 8320 0.00 130.38
33003-C3S3-ARC
33003-C3S3-ARC
33003-C3S3-ARC CP-03&04
33003-C3S1-ARC
33003-C3S1-ARC UCY BP-01 UCY BP-02
33003-C3S1-ARC CEMENT 1.29 19.12
33003-C3S1-ARC SAND 2.35 54.97
20106-TRAFFICM STONE 2.89 64.22
20106-TRAFFICM SIKA 204 0.00 39.20
20106-TRAFFICM SIKA 3006 ES 7.73 0.00
20106-TRAFFICM O-BASF 8320 0.00 156.96
CP-07 SIKA LATEX POWER 0.00 0.00
CP-07
CP-07
CP-07
CP-0602
CP-0602
CP-0602
CP-0602

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 0.00 60.8 60.80
CP-07 0 31.80 31.80
CP-0602 120.1 120.10

total
88.01 tons
182.88 tons
231.72 tons
39.20 kg
328.25 kg
287.34 kg
0.00 kg

total
54.56 tons
99.04 tons
126.38 tons
0.00 kg
320.52 kg
0.00 kg

total
13.04 tons
26.52 tons
38.23 tons
0.00 kg
0.00 kg
130.38 kg
total
20.41 tons
57.32 tons
67.11 tons
39.20 kg
7.73 kg
156.96 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 30/03/2021
Summary RQ
DATE Plant RQ NO Material QTY
30/3/2021 UCY BP-02 CEMENT 46.74
30/3/2021 UCY BP-02 SAND 95.08
30/3/2021 UCY BP-02 STONE 119.13
30/3/2021 UCY BP-02 O-BASF 8320 467.4
30/3/2021 UCY BP-01 CEMENT 7.38
30/3/2021 UCY BP-01 SAND 15.01
30/3/2021 UCY BP-01 STONE 18.81
30/3/2021 UCY BP-01 O-BASF 8320 73.81
Record BY
Operator
21
SUBJOB RECORDER
CP-07 CEMENT 54.12 tons
CP-07 SAND 110.09 tons
CP-07 STONE 137.94 tons
CP-07 SIKA 204 0.00 kg
CP-07 SIKA 3006 ES 0.00 kg
CP-07 O-BASF 8320 541.21 kg
CP-07 SIKA LATEX POWER 0.00 kg
CP-07
UCY BP-01 UCY BP-02
CEMENT 7.38 46.74
SAND 15.01 95.08
STONE 18.81 119.13
SIKA 204 0.00 0.00
SIKA 3006 ES 0.00 0.00
O-BASF 8320 73.81 467.40
SIKA LATEX POWER 0.00 0.00

CP-0602

UCY BP-01 UCY BP-02


CEMENT 0.00 0.00
SAND 0.00 0.00
STONE 0.00 0.00
SIKA 204 0.00 0.00
SIKA 3006 ES 0.00 0.00
O-BASF 8320 0.00 0.00

CP-07

UCY BP-01 UCY BP-02


CEMENT 7.38 46.74
SAND 15.01 95.08
STONE 18.81 119.13
SIKA 204 0.00 0.00
SIKA 3006 ES 0.00 0.00
O-BASF 8320 73.81 467.40

CP-03&04
UCY BP-01 UCY BP-02
CEMENT 0.00 0.00
SAND 0.00 0.00
STONE 0.00 0.00
SIKA 204 0.00 0.00
SIKA 3006 ES 0.00 0.00
O-BASF 8320 0.00 0.00
SIKA LATEX POWER 0.00 0.00

Check by
Plant Engineer

Check by
Engineer THAI
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 0 0 0.00
CP-07 18 114.00 132.00
CP-0602 0 0 0.00

total
54.12 tons
110.09 tons
137.94 tons
0.00 kg
0.00 kg
541.21 kg
0.00 kg

total
0.00 tons
0.00 tons
0.00 tons
0.00 kg
0.00 kg
0.00 kg

total
54.12 tons
110.09 tons
137.94 tons
0.00 kg
0.00 kg
541.21 kg
total
0.00 tons
0.00 tons
0.00 tons
0.00 kg
0.00 kg
0.00 kg
0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 31/03/2021
Summary RQ
DATE Plant RQ NO Material QTY
31/3/2021 UCY BP-01 289869 CEMENT 2.46
31/3/2021 UCY BP-01 289870 SAND 5.26
31/3/2021 UCY BP-01 289871 STONE 6.29
31/3/2021 UCY BP-01 289872 O-BASF 8320 22.14
31/3/2021 UCY BP-01 289873 CEMENT 2.76
31/3/2021 UCY BP-01 289874 SAND 11.36
31/3/2021 UCY BP-01 289875 STONE 12.59
31/3/2021 UCY BP-01 289876 O-BASF 8320 27.6
31/3/2021 UCY BP-01 289877 CEMENT 3.11
31/3/2021 UCY BP-01 289878 SAND 12.77
31/3/2021 UCY BP-01 289879 STONE 14.16
31/3/2021 UCY BP-01 289880 O-BASF 8320 31.05
31/3/2021 UCY BP-01 289881 CEMENT 0.72
31/3/2021 UCY BP-01 289882 SAND 1.81
31/3/2021 UCY BP-01 289883 STONE 2.1
31/3/2021 UCY BP-01 289884 O-BASF 8320 7.2
31/3/2021 UCY BP-01 289885 CEMENT 2.99
31/3/2021 UCY BP-01 289886 SAND 12.3
31/3/2021 UCY BP-01 289887 STONE 13.64
31/3/2021 UCY BP-01 289888 O-BASF 8320 29.9
31/3/2021 UCY BP-01 289889 CEMENT 0.69
31/3/2021 UCY BP-01 289890 SAND 1.25
31/3/2021 UCY BP-01 289891 STONE 1.55
31/3/2021 UCY BP-01 289892 SIKA 3006 ES 4.14
31/3/2021 UCY BP-02 289893 CEMENT 11.15
31/3/2021 UCY BP-02 289894 SAND 22.64
31/3/2021 UCY BP-02 289895 STONE 26.86
31/3/2021 UCY BP-02 289896 O-BASF 8320 109.20
31/3/2021 UCY BP-01 CEMENT 9.23
31/3/2021 UCY BP-01 SAND 18.61
31/3/2021 UCY BP-01 STONE 23.33
31/3/2021 UCY BP-01 O-BASF 8320 92.25
31/3/2021 UCY BP-02 CEMENT 33.93
31/3/2021 UCY BP-02 SAND 68.27
31/3/2021 UCY BP-02 STONE 86.56
31/3/2021 UCY BP-02 O-BASF 8320 339.28
31/3/2021 UCY BP-01 CEMENT 58.89
31/3/2021 UCY BP-01 SAND 98.52
31/3/2021 UCY BP-01 STONE 125.09
31/3/2021 UCY BP-01 SIKA 3006 ES 315.30
1

SUBJOB RECORDER
20103-TRAFFICM CEMENT
20103-TRAFFICM SAND
20103-TRAFFICM STONE
20103-TRAFFICM SIKA 204
S4000-C3S1-SUB SIKA 3006 ES
S4000-C3S1-SUB O-BASF 8320
S4000-C3S1-SUB SIKA LATEX POWER
S4000-C3S1-SUB
S4000-C3S2-SUB
S4000-C3S2-SUB CEMENT
S4000-C3S2-SUB SAND
S4000-C3S2-SUB STONE
20106-TRAFFICM SIKA 204
20106-TRAFFICM SIKA 3006 ES
20106-TRAFFICM O-BASF 8320
20106-TRAFFICM SIKA LATEX POWER
S4000-C3S2-SUB
S4000-C3S2-SUB CP-0602
S4000-C3S2-SUB
S4000-C3S2-SUB
28001-SP-A-SUP CEMENT
28001-SP-A-SUP SAND
28001-SP-A-SUP STONE
28001-SP-A-SUP SIKA 204
S4000-C3S2-SUB SIKA 3006 ES
S4000-C3S2-SUB O-BASF 8320
S4000-C3S2-SUB
S4000-C3S2-SUB
CP-07 CP-07
CP-07
CP-07
CP-07 CEMENT
CP-07 SAND
CP-07 STONE
CP-07 SIKA 204
CP-07 SIKA 3006 ES
CP-0602 O-BASF 8320
CP-0602
CP-0602
CP-0602 CP-03&04
CEMENT
SAND
STONE
SIKA 204
SIKA 3006 ES
O-BASF 8320
SIKA LATEX POWER
QUANTITY
125.93 tons - UCY BP-01 UCY BP-02 total
252.79 tons CP-03&04 48 26.5 74.50
312.17 tons CP-07 22.5 82.75 105.25
0.00 kg CP-0602 118.9 0 118.90
319.44 kg
658.62 kg
0.00 kg

UCY BP-01 UCY BP-02 total


80.85 45.08 125.93 tons
161.88 90.91 252.79 tons
198.75 113.42 312.17 tons
0.00 0.00 0.00 kg
319.44 0.00 319.44 kg
210.14 448.48 658.62 kg
0.00 0.00 0.00 kg

UCY BP-01 UCY BP-02 total


58.89 0.00 58.89 tons
98.52 0.00 98.52 tons
125.09 0.00 125.09 tons
0.00 0.00 0.00 kg
315.30 0.00 315.30 kg
0.00 0.00 0.00 kg

UCY BP-01 UCY BP-02 total


9.23 33.93 43.16 tons
18.61 68.27 86.88 tons
23.33 86.56 109.89 tons
0.00 0.00 0.00 kg
0.00 0.00 0.00 kg
92.25 339.28 431.53 kg
UCY BP-01 UCY BP-02 total
12.73 11.15 23.88 tons
44.75 22.64 67.39 tons
50.33 26.86 77.19 tons
0.00 0.00 0.00 kg
4.14 0.00 4.14 kg
117.89 109.20 227.09 kg
0.00 0.00 0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 01/04/2021
Summary RQ
DATE Plant RQ NO Material QTY
1/4/2021 UCY BP-01 289093 CEMENT 1.23
1/4/2021 UCY BP-01 289094 SAND 2.63
1/4/2021 UCY BP-01 289095 STONE 3.15
1/4/2021 UCY BP-01 289096 O-BASF 8320 11.07
1/4/2021 UCY BP-01 289097 CEMENT 12.83
1/4/2021 UCY BP-01 289098 SAND 25.94
1/4/2021 UCY BP-01 289099 STONE 30.99
1/4/2021 UCY BP-01 289100 O-BASF 8320 126
1/4/2021 UCY BP-02 289901 CEMENT 3.97
1/4/2021 UCY BP-02 289902 SAND 10.74
1/4/2021 UCY BP-02 289903 STONE 13.9
1/4/2021 UCY BP-02 289904 O-BASF 8320 37.4
1/4/2021 UCY BP-02 289905 CEMENT 3.12
1/4/2021 UCY BP-02 289906 SAND 10.6
1/4/2021 UCY BP-02 289907 STONE 12.03
1/4/2021 UCY BP-02 289908 O-BASF 8320 31.2
1/4/2021 UCY BP-02 289909 CEMENT 3.45
1/4/2021 UCY BP-02 289910 SAND 14.16
1/4/2021 UCY BP-02 289911 STONE 15.75
1/4/2021 UCY BP-02 289912 O-BASF 8320 34.5
1/4/2021 UCY BP-02 289913 CEMENT 0.82
1/4/2021 UCY BP-02 289914 SAND 1.75
1/4/2021 UCY BP-02 289915 STONE 2.1
1/4/2021 UCY BP-02 289916 O-BASF 8320 7.38
1/4/2021 UCY BP-02 289917 CEMENT 1.23
1/4/2021 UCY BP-02 289918 SAND 2.63
1/4/2021 UCY BP-02 289919 STONE 3.15
1/4/2021 UCY BP-02 289920 O-BASF 8320 11.07
1/4/2021 UCY BP-02 289921 CEMENT 0.63
1/4/2021 UCY BP-02 289922 SAND 1.25
1/4/2021 UCY BP-02 289923 STONE 1.55
1/4/2021 UCY BP-02 289924 O-BASF 8320 6.30
1/4/2021 UCY BP-02 CEMENT 37.43
1/4/2021 UCY BP-02 SAND 75.41
1/4/2021 UCY BP-02 STONE 95.04
1/4/2021 UCY BP-02 O-BASF 8320 374.33
1/4/2021 UCY BP-01 CEMENT 62.97
1/4/2021 UCY BP-01 SAND 112.39
1/4/2021 UCY BP-01 STONE 144.29
1/4/2021 UCY BP-01 SIKA 3006 ES 377.84
1/4/2021 UCY BP-02 CEMENT 6.80
1/4/2021 UCY BP-02 SAND 14.33
1/4/2021 UCY BP-02 STONE 17.92
1/4/2021 UCY BP-02 SIKA 3006 ES 30.60
021

SUBJOB RECORDER
20103-TRAFFICM CEMENT
20103-TRAFFICM SAND
20103-TRAFFICM STONE
20103-TRAFFICM SIKA 204
S4000-C3S2-SUB SIKA 3006 ES
S4000-C3S2-SUB O-BASF 8320
S4000-C3S2-SUB SIKA LATEX POWER
S4000-C3S2-SUB
S4000-C3S2-SUB
S4000-C3S2-SUB CEMENT
S4000-C3S2-SUB SAND
S4000-C3S2-SUB STONE
S4000-C3S3-SUB SIKA 204
S4000-C3S3-SUB SIKA 3006 ES
S4000-C3S3-SUB O-BASF 8320
S4000-C3S3-SUB SIKA LATEX POWER
S4000-C3S1-SUB
S4000-C3S1-SUB CP-0602
S4000-C3S1-SUB
S4000-C3S1-SUB
28003-C3ML-SUB CEMENT
28003-C3ML-SUB SAND
28003-C3ML-SUB STONE
28003-C3ML-SUB SIKA 204
20103-TRAFFICM SIKA 3006 ES
20103-TRAFFICM O-BASF 8320
20103-TRAFFICM
20103-TRAFFICM
S4000-C3S3-SUB CP-07
S4000-C3S3-SUB
S4000-C3S3-SUB
S4000-C3S3-SUB CEMENT
CP-07 SAND
CP-07 STONE
CP-07 SIKA 204
CP-07 SIKA 3006 ES
CP-0602 O-BASF 8320
CP-0602
CP-0602
CP-0602 CP-03&04
CP-0602
CP-0602
CP-0602
CP-0602

CEMENT
SAND
STONE
SIKA 204
SIKA 3006 ES
O-BASF 8320
SIKA LATEX POWER
QUANTITY
134.48 tons - UCY BP-01 UCY BP-02 total
271.83 tons CP-03&04 0 45.5 45.50
339.87 tons CP-07 0 91.30 91.30
0.00 kg CP-0602 136.9 17 153.90
408.44 kg
639.25 kg
0.00 kg

UCY BP-01 UCY BP-02 total


77.03 57.45 134.48 tons
140.96 130.87 271.83 tons
178.43 161.44 339.87 tons
0.00 0.00 0.00 kg
377.84 30.60 408.44 kg
137.07 502.18 639.25 kg
0.00 0.00 0.00 kg

UCY BP-01 UCY BP-02 total


62.97 6.80 69.77 tons
112.39 14.33 126.72 tons
144.29 17.92 162.21 tons
0.00 0.00 0.00 kg
377.84 30.60 408.44 kg
0.00 0.00 0.00 kg

UCY BP-01 UCY BP-02 total


0.00 37.43 37.43 tons
0.00 75.41 75.41 tons
0.00 95.04 95.04 tons
0.00 0.00 0.00 kg
0.00 0.00 0.00 kg
0.00 374.33 374.33 kg
UCY BP-01 UCY BP-02 total
14.06 13.22 27.28 tons
28.57 41.13 69.70 tons
34.14 48.48 82.62 tons
0.00 0.00 0.00 kg
0.00 0.00 0.00 kg
137.07 127.85 264.92 kg
0.00 0.00 0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 02/04/2021
Summary RQ
DATE Plant RQ NO Material QTY
2/4/2021 UCY BP-01 289926 CEMENT 6.47
2/4/2021 UCY BP-01 289927 SAND 15.06
2/4/2021 UCY BP-01 289928 STONE 18.97
2/4/2021 UCY BP-01 289929 O-BASF 8320 59.45
2/4/2021 UCY BP-01 289930 CEMENT 1.73
2/4/2021 UCY BP-01 289931 SAND 7.1
2/4/2021 UCY BP-01 289932 STONE 7.86
2/4/2021 UCY BP-01 289933 O-BASF 8320 17.25
2/4/2021 UCY BP-01 289934 CEMENT 2.46
2/4/2021 UCY BP-01 289935 SAND 5.27
2/4/2021 UCY BP-01 289936 STONE 3.69
2/4/2021 UCY BP-01 289937 O-BASF 8320 22.14
2/4/2021 UCY BP-01 289938 CEMENT 0.41
2/4/2021 UCY BP-01 289939 SAND 0.88
2/4/2021 UCY BP-01 289940 STONE 1.05
2/4/2021 UCY BP-01 289941 O-BASF 8320 3.69
2/4/2021 UCY BP-01 289942 CEMENT 0.63
2/4/2021 UCY BP-01 289943 SAND 1.26
2/4/2021 UCY BP-01 289944 STONE 1.58
2/4/2021 UCY BP-01 289945 SIKA 204 6.3
2/4/2021 UCY BP-02 289946 CEMENT 17.03
2/4/2021 UCY BP-02 289947 SAND 42.66
2/4/2021 UCY BP-02 289948 STONE 52.27
2/4/2021 UCY BP-02 289949 SIKA 204 235.2
2/4/2021 UCY BP-02 CEMENT 15.99
2/4/2021 UCY BP-02 SAND 32.37
2/4/2021 UCY BP-02 STONE 40.48
2/4/2021 UCY BP-02 O-BASF 8320 159.90
2/4/2021 UCY BP-01 CEMENT 41.86
2/4/2021 UCY BP-01 SAND 74.62
2/4/2021 UCY BP-01 STONE 96.55
2/4/2021 UCY BP-01 SIKA 3006 ES 251.16
021
SUBJOB RECORDER
S4000-C3S1-SUB CEMENT 86.58
S4000-C3S1-SUB SAND 179.22
S4000-C3S1-SUB STONE 222.45
S4000-C3S1-SUB SIKA 204 241.50
S4000-C3S2-SUB SIKA 3006 ES 251.16
S4000-C3S2-SUB O-BASF 8320 262.43
S4000-C3S2-SUB SIKA LATEX POWER 0.00
S4000-C3S2-SUB
20103-TRAFFICM UCY BP-01
20103-TRAFFICM CEMENT 53.56
20103-TRAFFICM SAND 104.19
20103-TRAFFICM STONE 129.70
24000-C3ML-SUB SIKA 204 6.30
24000-C3ML-SUB SIKA 3006 ES 251.16
24000-C3ML-SUB O-BASF 8320 102.53
24000-C3ML-SUB SIKA LATEX POWER 0.00
11301-LAB
11301-LAB CP-0602
11301-LAB
11301-LAB UCY BP-01
31002-C3S4-SUB CEMENT 41.86
31002-C3S4-SUB SAND 74.62
31002-C3S4-SUB STONE 96.55
31002-C3S4-SUB SIKA 204 0.00
CP-07 SIKA 3006 ES 251.16
CP-07 O-BASF 8320 0.00
CP-07
CP-07
CP-0602 CP-07
CP-0602
CP-0602 UCY BP-01
CP-0602 CEMENT 0.00
SAND 0.00
STONE 0.00
SIKA 204 0.00
SIKA 3006 ES 0.00
O-BASF 8320 0.00

CP-03&04
UCY BP-01
CEMENT 11.70
SAND 29.57
STONE 33.15
SIKA 204 6.30
SIKA 3006 ES 0.00
O-BASF 8320 102.53
SIKA LATEX POWER 0.00
QUANTITY
tons - UCY BP-01 UCY BP-02 total
tons CP-03&04 0 48.5 48.50
tons CP-07 0 39.00 39.00
kg CP-0602 91 0 91.00
kg
kg
kg

UCY BP-02 total


33.02 86.58 tons
75.03 179.22 tons
92.75 222.45 tons
235.20 241.50 kg
0.00 251.16 kg
159.90 262.43 kg
0.00 0.00 kg

UCY BP-02 total


0.00 41.86 tons
0.00 74.62 tons
0.00 96.55 tons
0.00 0.00 kg
0.00 251.16 kg
0.00 0.00 kg

UCY BP-02 total


15.99 15.99 tons
32.37 32.37 tons
40.48 40.48 tons
0.00 0.00 kg
0.00 0.00 kg
159.90 159.90 kg
UCY BP-02 total
17.03 28.73 tons
42.66 72.23 tons
52.27 85.42 tons
235.20 241.50 kg
0.00 0.00 kg
0.00 102.53 kg
0.00 0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 03/04/2021
Summary RQ
DATE Plant RQ NO Material QTY
3/4/2021 UCY BP-01 289950 CEMENT 1.7
3/4/2021 UCY BP-01 289951 SAND 3.73
3/4/2021 UCY BP-01 289952 STONE 3.61
3/4/2021 UCY BP-01 289953 O-BASF 8320 14.7
3/4/2021 UCY BP-01 289954 CEMENT 0.63
3/4/2021 UCY BP-01 289955 SAND 1.26
3/4/2021 UCY BP-01 289956 STONE 1.55
3/4/2021 UCY BP-01 289957 O-BASF 8320 6.3
3/4/2021 UCY BP-01 289958 CEMENT 0.792
3/4/2021 UCY BP-01 289959 SAND 1.99
3/4/2021 UCY BP-01 289960 STONE 2.3
3/4/2021 UCY BP-01 289961 O-BASF 8320 7.92
3/4/2021 UCY BP-02 289962 CEMENT 1.23
3/4/2021 UCY BP-02 289963 SAND 2.63
3/4/2021 UCY BP-02 289964 STONE 3.14
3/4/2021 UCY BP-02 289965 O-BASF 8320 11.07
3/4/2021 UCY BP-02 CEMENT 28.29
3/4/2021 UCY BP-02 SAND 57.68
3/4/2021 UCY BP-02 STONE 71.97
3/4/2021 UCY BP-02 O-BASF 8320 282.9
3/4/2021 UCY BP-02 CEMENT 51.52
3/4/2021 UCY BP-02 SAND 92.73
3/4/2021 UCY BP-02 STONE 117.82
3/4/2021 UCY BP-02 SIKA 3006 ES 309.12
04/2021
SUBJOB RECORDER
S4000-C3S3-SUB CEMENT
S4000-C3S3-SUB SAND
S4000-C3S3-SUB STONE
S4000-C3S3-SUB SIKA 204
S4000-C3S2-SUB SIKA 3006 ES
S4000-C3S2-SUB O-BASF 8320
S4000-C3S2-SUB SIKA LATEX POWER
S4000-C3S2-SUB
20106-TRAFFICM
20106-TRAFFICM CEMENT
20106-TRAFFICM SAND
20106-TRAFFICM STONE
20106-TRAFFICM SIKA 204
20106-TRAFFICM SIKA 3006 ES
20106-TRAFFICM O-BASF 8320
20106-TRAFFICM SIKA LATEX POWER
CP-07
CP-07 CP-0602
CP-07
CP-07
CP-0602 CEMENT
CP-0602 SAND
CP-0602 STONE
CP-0602 SIKA 204
SIKA 3006 ES
O-BASF 8320

CP-07

CEMENT
SAND
STONE
SIKA 204
SIKA 3006 ES
O-BASF 8320

CP-03&04
CEMENT
SAND
STONE
SIKA 204
SIKA 3006 ES
O-BASF 8320
SIKA LATEX POWER
QUANTITY
84.16 tons - UCY BP-01 UCY BP-02 total
160.02 tons CP-03&04 0 3 3.00
200.39 tons CP-07 0 69.00 69.00
0.00 kg CP-0602 112 0 112.00
309.12 kg
322.89 kg
0.00 kg

UCY BP-01 UCY BP-02 total


3.12 81.04 84.16 tons
6.98 153.04 160.02 tons
7.46 192.93 200.39 tons
0.00 0.00 0.00 kg
0.00 309.12 309.12 kg
28.92 293.97 322.89 kg
0.00 0.00 0.00 kg

UCY BP-01 UCY BP-02 total


0.00 51.52 51.52 tons
0.00 92.73 92.73 tons
0.00 117.82 117.82 tons
0.00 0.00 0.00 kg
0.00 309.12 309.12 kg
0.00 0.00 0.00 kg

UCY BP-01 UCY BP-02 total


0.00 28.29 28.29 tons
0.00 57.68 57.68 tons
0.00 71.97 71.97 tons
0.00 0.00 0.00 kg
0.00 0.00 0.00 kg
0.00 282.90 282.90 kg
UCY BP-01 UCY BP-02 total
3.12 1.23 4.35 tons
6.98 2.63 9.61 tons
7.46 3.14 10.60 tons
0.00 0.00 0.00 kg
0.00 0.00 0.00 kg
28.92 11.07 39.99 kg
0.00 0.00 0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 04/04/2021
Summary RQ
DATE Plant RQ NO Material QTY
4/4/2021 UCY BP-01 289966 CEMENT 5.94
4/4/2021 UCY BP-01 289967 SAND 16.67
4/4/2021 UCY BP-01 289968 STONE 20.63
4/4/2021 UCY BP-01 289969 O-BASF 8320 57.1
4/4/2021 UCY BP-01 289970 CEMENT 0.63
4/4/2021 UCY BP-01 289971 SAND 1.26
4/4/2021 UCY BP-01 289972 STONE 1.55
4/4/2021 UCY BP-01 289973 O-BASF 8320 6.3
4/4/2021 UCY BP-02 289974 CEMENT 1.38
4/4/2021 UCY BP-02 289975 SAND 2.89
4/4/2021 UCY BP-02 289976 STONE 2.58
4/4/2021 UCY BP-02 289977 O-BASF 8320 11.5
4/4/2021 UCY BP-02 289978 CEMENT 7.59
4/4/2021 UCY BP-02 289979 SAND 15.9
4/4/2021 UCY BP-02 289980 STONE 17.53
4/4/2021 UCY BP-02 289981 O-BASF 8320 71.4
4/4/2021 UCY BP-02 289982 CEMENT 2.46
4/4/2021 UCY BP-02 289983 SAND 5.27
4/4/2021 UCY BP-02 289984 STONE 6.28
4/4/2021 UCY BP-02 289985 O-BASF 8320 22.14
4/4/2021 UCY BP-02 CEMENT 16.81
4/4/2021 UCY BP-02 SAND 33.99
4/4/2021 UCY BP-02 STONE 42.72
4/4/2021 UCY BP-02 O-BASF 8320 168.1
4/4/2021 CEMENT 31.14
4/4/2021 SAND 57.31
4/4/2021 STONE 73.08
4/4/2021 O-BASF 8320 178.66
SUBJOB RECORDER
S4000-C3S2-SUB CEMENT 65.95
S4000-C3S2-SUB SAND 133.29
S4000-C3S2-SUB STONE 164.37
S4000-C3S2-SUB SIKA 204 0.00
S4000-C3S1-SUB SIKA 3006 ES 0.00
S4000-C3S1-SUB O-BASF 8320 515.20
S4000-C3S1-SUB SIKA LATEX POWER 0.00
S4000-C3S1-SUB
S4000-C3S4-SUB UCY BP-01
S4000-C3S4-SUB CEMENT 6.57
S4000-C3S4-SUB SAND 17.93
S4000-C3S4-SUB STONE 22.18
S4000-C3S2-SUB SIKA 204 0.00
S4000-C3S2-SUB SIKA 3006 ES 0.00
S4000-C3S2-SUB O-BASF 8320 63.40
S4000-C3S2-SUB SIKA LATEX POWER 0.00
20103-TRAFFCM
20103-TRAFFCM CP-0602
20103-TRAFFCM
20103-TRAFFCM UCY BP-01
CP-07 CEMENT 0.00
CP-07 SAND 0.00
CP-07 STONE 0.00
CP-07 SIKA 204 0.00
CP-0602 SIKA 3006 ES 0.00
CP-0602 O-BASF 8320 0.00
CP-0602
CP-0602
CP-07

UCY BP-01
CEMENT 0.00
SAND 0.00
STONE 0.00
SIKA 204 0.00
SIKA 3006 ES 0.00
O-BASF 8320 0.00

CP-03&04
UCY BP-01
CEMENT 6.57
SAND 17.93
STONE 22.18
SIKA 204 0.00
SIKA 3006 ES 0.00
O-BASF 8320 63.40
SIKA LATEX POWER 0.00
QUANTITY
tons - UCY BP-01 UCY BP-02 total
tons CP-03&04 0 27 27.00
tons CP-07 0 41.00 41.00
kg CP-0602 69.5 0 69.50
kg
kg
kg

UCY BP-02 total


28.24 34.81 tons
58.05 75.98 tons
69.11 91.29 tons
0.00 0.00 kg
0.00 0.00 kg
273.14 336.54 kg
0.00 0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
UCY BP-02 total CP-07
0.00 0.00 tons O-BASF 8320
0.00 0.00 tons
0.00 0.00 tons
0.00 0.00 kg
0.00 0.00 kg
0.00 0.00 kg

UCY BP-02 total


16.81 16.81 tons
33.99 33.99 tons
42.72 42.72 tons
0.00 0.00 kg
0.00 0.00 kg
168.10 168.10 kg
UCY BP-02 total
11.43 18.00 tons
24.06 41.99 tons
26.39 48.57 tons
0.00 0.00 kg
0.00 0.00 kg
105.04 168.44 kg
0.00 0.00 kg
UCY BP 05/04/2021
Summary RQ
DATE Plant RQ NO Material QTY
5/4/2021 UCY BP-02 289986 CEMENT 12.83
5/4/2021 UCY BP-02 289987 SAND 26.09
5/4/2021 UCY BP-02 289988 STONE 30.93
5/4/2021 UCY BP-02 289989 O-BASF 8320 126
5/4/2021 UCY BP-02 289990 CEMENT 2.46
5/4/2021 UCY BP-02 289991 SAND 5.29
5/4/2021 UCY BP-02 289992 STONE 6.28
5/4/2021 UCY BP-02 289993 O-BASF 8320 22.14
5/4/2021 UCY BP-02 289994 CEMENT 0.72
5/4/2021 UCY BP-02 289995 SAND 1.82
5/4/2021 UCY BP-02 289996 STONE 2.09
5/4/2021 UCY BP-02 289997 O-BASF 8320 7.2
5/4/2021 UCY BP-02 289998 CEMENT 0.33
5/4/2021 UCY BP-02 289999 SAND 0.77
5/4/2021 UCY BP-02 290000 STONE 1.29
5/4/2021 UCY BP-02 290001 O-BASF 8320 2.6
5/4/2021 UCY BP-02 290002 CEMENT 0.42
5/4/2021 UCY BP-02 290003 SAND 0.84
5/4/2021 UCY BP-02 290004 STONE 1.03
5/4/2021 UCY BP-02 290005 O-BASF 8320 4.2
5/4/2021 UCY BP-02 290006 CEMENT 1.09
5/4/2021 UCY BP-02 290007 SAND 2.19
5/4/2021 UCY BP-02 290008 STONE 2.68
5/4/2021 UCY BP-02 290009 O-BASF 8320 10.92
5/4/2021 UCY BP-02 CEMENT 22.14
5/4/2021 UCY BP-02 SAND 44.93
5/4/2021 UCY BP-02 STONE 56.27
5/4/2021 UCY BP-02 O-BASF 8320 221.40
5/4/2021 UCY BP-01 CEMENT 61.47
5/4/2021 UCY BP-01 SAND 111.01
5/4/2021 UCY BP-01 STONE 141.86
5/4/2021 UCY BP-01 SIKA 3006 ES 363.90
1
SUBJOB RECORDER
S4000-C3S2-SUB CEMENT 101.46
S4000-C3S2-SUB SAND 192.94
S4000-C3S2-SUB STONE 242.43
S4000-C3S2-SUB SIKA 204 0.00
20103-TRAFFICM SIKA 3006 ES 363.90
20103-TRAFFICM O-BASF 8320 394.46
20103-TRAFFICM SIKA LATEX POWER 0.00
20103-TRAFFICM
24000-C3ML-SUB UCY BP-01
24000-C3ML-SUB CEMENT 61.47
24000-C3ML-SUB SAND 111.01
24000-C3ML-SUB STONE 141.86
S4000-C3S1-SUB SIKA 204 0.00
S4000-C3S1-SUB SIKA 3006 ES 363.90
S4000-C3S1-SUB O-BASF 8320 0.00
S4000-C3S1-SUB SIKA LATEX POWER 0.00
S4000-C3S3-SUB
S4000-C3S3-SUB CP-0602
S4000-C3S3-SUB
S4000-C3S3-SUB UCY BP-01
33003-C3S4-ARC CEMENT 61.47
33003-C3S4-ARC SAND 111.01
33003-C3S4-ARC STONE 141.86
33003-C3S4-ARC SIKA 204 0.00
CP-07 SIKA 3006 ES 363.90
CP-07 O-BASF 8320 0.00
CP-07
CP-07
CP-0602 CP-07
CP-0602
CP-0602 UCY BP-01
CP-0602 CEMENT 0.00
SAND 0.00
STONE 0.00
SIKA 204 0.00
SIKA 3006 ES 0.00
O-BASF 8320 0.00

CP-03&04
UCY BP-01
CEMENT 0.00
SAND 0.00
STONE 0.00
SIKA 204 0.00
SIKA 3006 ES 0.00
O-BASF 8320 0.00
SIKA LATEX POWER 0.00
QUANTITY
tons - UCY BP-01 UCY BP-02 total
tons CP-03&04 0 43.1 43.10
tons CP-07 0 54.00 54.00
kg CP-0602 134.7 0 134.70
kg
kg
kg

UCY BP-02 total


39.99 101.46 tons
81.93 192.94 tons
100.57 242.43 tons
0.00 0.00 kg
0.00 363.90 kg
394.46 394.46 kg
0.00 0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
UCY BP-02 total CP-07
0.00 61.47 tons O-BASF 8320
0.00 111.01 tons
0.00 141.86 tons
0.00 0.00 kg
0.00 363.90 kg
0.00 0.00 kg

UCY BP-02 total


22.14 22.14 tons
44.93 44.93 tons
56.27 56.27 tons
0.00 0.00 kg
0.00 0.00 kg
221.40 221.40 kg
UCY BP-02 total
17.85 17.85 tons
37.00 37.00 tons
44.30 44.30 tons
0.00 0.00 kg
0.00 0.00 kg
173.06 173.06 kg
0.00 0.00 kg
UCY BP 06/04/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
6/4/2021 UCY BP-01 290010 CEMENT 11.15 S4000-C3S2-SUB
6/4/2021 UCY BP-01 290011 SAND 22.69 S4000-C3S2-SUB
6/4/2021 UCY BP-01 290012 STONE 26.78 S4000-C3S2-SUB
6/4/2021 UCY BP-01 290013 O-BASF 8320 109.2 S4000-C3S2-SUB
6/4/2021 UCY BP-01 290014 CEMENT 1.47 28001-SP-A-SUP
6/4/2021 UCY BP-01 290015 SAND 2.68 28001-SP-A-SUP
6/4/2021 UCY BP-01 290016 STONE 3.3 28001-SP-A-SUP
6/4/2021 UCY BP-01 290017 SIKA 3006 ES 8.83 28001-SP-A-SUP
6/4/2021 UCY BP-02 290018 CEMENT 1.38 S4000-C3S1-SUB
6/4/2021 UCY BP-02 290019 SAND 5.69 S4000-C3S1-SUB
6/4/2021 UCY BP-02 290020 STONE 6.28 S4000-C3S1-SUB
6/4/2021 UCY BP-02 290021 O-BASF 8320 13.8 S4000-C3S1-SUB
6/4/2021 UCY BP-02 290022 CEMENT 2.46 20103-TRAFFICM
6/4/2021 UCY BP-02 290023 SAND 5.27 20103-TRAFFICM
6/4/2021 UCY BP-02 290024 STONE 6.28 20103-TRAFFICM
6/4/2021 UCY BP-02 290025 O-BASF 8320 22.14 20103-TRAFFICM
6/4/2021 UCY BP-02 290026 CEMENT 1.46 S4000-C3S4-SUB
6/4/2021 UCY BP-02 290027 SAND 3.45 S4000-C3S4-SUB
6/4/2021 UCY BP-02 290028 STONE 5.8 S4000-C3S4-SUB
6/4/2021 UCY BP-02 290029 O-BASF 8320 11.7 S4000-C3S4-SUB
6/4/2021 UCY BP-02 290030 CEMENT 1.05 33003-C3S1-ARC
6/4/2021 UCY BP-02 290031 SAND 2.61 33003-C3S1-ARC
6/4/2021 UCY BP-02 290032 STONE 3.26 33003-C3S1-ARC
6/4/2021 UCY BP-02 290033 SIKA 204 14.7 33003-C3S1-ARC
6/4/2021 UCY BP-01 CEMENT 38.95 CP-07
6/4/2021 UCY BP-01 SAND 78.47 CP-07
6/4/2021 UCY BP-01 STONE 99.18 CP-07
6/4/2021 UCY BP-01 O-BASF 8320 389.50 CP-07
6/4/2021 UCY BP-02 CEMENT 15.91 CP-07
6/4/2021 UCY BP-02 SAND 32.05 CP-07
6/4/2021 UCY BP-02 STONE 40.51 CP-07
6/4/2021 UCY BP-02 O-BASF 8320 159.08 CP-07
6/4/2021 UCY BP-01 CEMENT 5.40 CP-0602
6/4/2021 UCY BP-01 SAND 11.15 CP-0602
6/4/2021 UCY BP-01 STONE 14.05 CP-0602
6/4/2021 UCY BP-01 SIKA 3006 ES 24.30 CP-0602
6/4/2021 UCY BP-02 CEMENT 55.20 CP-0602
6/4/2021 UCY BP-02 SAND 98.88 CP-0602
6/4/2021 UCY BP-02 STONE 126.48 CP-0602
6/4/2021 UCY BP-02 SIKA 3006 ES 331.20 CP-0602
RECORDER QUANTITY
CEMENT 134.43 tons -
SAND 262.94 tons CP-03&04
STONE 331.92 tons CP-07
SIKA 204 14.70 kg CP-0602
SIKA 3006 ES 364.33 kg
O-BASF 8320 705.42 kg
SIKA LATEX POWER 0.00 kg

UCY BP-01UCY BP-02 total


CEMENT 56.97 77.46 134.43 tons
SAND 114.99 147.95 262.94 tons
STONE 143.31 188.61 331.92 tons
SIKA 204 0.00 14.70 14.70 kg
SIKA 3006 ES 33.13 331.20 364.33 kg
O-BASF 8320 498.70 206.72 705.42 kg
SIKA LATEX POWER 0.00 0.00 0.00 kg

CP-0602

UCY BP-01UCY BP-02 total


CEMENT 5.40 55.20 60.60 tons
SAND 11.15 98.88 110.03 tons
STONE 14.05 126.48 140.53 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 24.30 331.20 355.50 kg
O-BASF 8320 0.00 0.00 0.00 kg

CP-07

UCY BP-01UCY BP-02 total


CEMENT 38.95 15.91 54.86 tons
SAND 78.47 32.05 110.52 tons
STONE 99.18 40.51 139.69 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 0.00 0.00 0.00 kg
O-BASF 8320 389.50 159.08 548.58 kg

CP-03&04
UCY BP-01UCY BP-02 total
CEMENT 12.62 6.35 18.97 tons
SAND 25.37 17.02 42.39 tons
STONE 30.08 21.62 51.70 tons
SIKA 204 0.00 14.70 14.70 kg
SIKA 3006 ES 8.83 0.00 8.83 kg
O-BASF 8320 109.20 47.64 156.84 kg
SIKA LATEX POWER 0.00 0.00 0.00 kg
QUANTITY
UCY BP-01 UCY BP-02 total
30 19.5 49.20
95 38.80 133.80
13.5 120 133.50

SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 07/04/2021
Summary RQ
DATE Plant RQ NO Material QTY
7/4/2021 UCY BP-01 290034 CEMENT 11.15
7/4/2021 UCY BP-01 290035 SAND 22.69
7/4/2021 UCY BP-01 290036 STONE 26.81
7/4/2021 UCY BP-01 290037 O-BASF 8320 109.2
7/4/2021 UCY BP-02 290038 CEMENT 1.61
7/4/2021 UCY BP-02 290039 SAND 3.31
7/4/2021 UCY BP-02 290040 STONE 3.09
7/4/2021 UCY BP-02 290041 O-BASF 8320 13.8
7/4/2021 UCY BP-02 290042 CEMENT 2.52
7/4/2021 UCY BP-02 290043 SAND 5.05
7/4/2021 UCY BP-02 290044 STONE 6.19
7/4/2021 UCY BP-02 290045 O-BASF 8320 25.2
7/4/2021 UCY BP-02 290046 CEMENT 1.05
7/4/2021 UCY BP-02 290047 SAND 2.11
7/4/2021 UCY BP-02 290048 STONE 2.58
7/4/2021 UCY BP-02 290049 O-BASF 8320 10.5
7/4/2021 UCY BP-02 290050 CEMENT 0.84
7/4/2021 UCY BP-02 290051 SAND 1.68
7/4/2021 UCY BP-02 290052 STONE 2.06
7/4/2021 UCY BP-02 290053 O-BASF 8320 8.4
7/4/2021 UCY BP-02 290054 CEMENT 0.42
7/4/2021 UCY BP-02 290055 SAND 0.84
7/4/2021 UCY BP-02 290056 STONE 1.03
7/4/2021 UCY BP-02 290057 O-BASF 8320 4.2
7/4/2021 UCY BP-02 290058 CEMENT 1.38
7/4/2021 UCY BP-02 290059 SAND 2.51
7/4/2021 UCY BP-02 290060 STONE 3.10
7/4/2021 UCY BP-02 290061 O-BASF 8320 13.80
7/4/2021 UCY BP-02 290062 CEMENT 1.60
7/4/2021 UCY BP-02 290063 SAND 3.52
7/4/2021 UCY BP-02 290064 STONE 5.54
7/4/2021 UCY BP-02 290065 O-BASF 8320 13.70
7/4/2021 UCY BP-02 290066 CEMENT 2.46
7/4/2021 UCY BP-02 290067 SAND 5.27
7/4/2021 UCY BP-02 290068 STONE 6.28
7/4/2021 UCY BP-02 290069 O-BASF 8320 22.14
7/4/2021 UCY BP-02 290070 CEMENT 2.07
7/4/2021 UCY BP-02 290071 SAND 8.53
7/4/2021 UCY BP-02 290072 STONE 9.42
7/4/2021 UCY BP-02 290073 O-BASF 8320 20.70
7/4/2021 UCY BP-02 290074 CEMENT 1.75
7/4/2021 UCY BP-02 290075 SAND 3.18
7/4/2021 UCY BP-02 290076 STONE 3.92
7/4/2021 UCY BP-02 290077 SIKA 3006 ES 10.48
7/4/2021 UCY BP-01 CEMENT 38.75
7/4/2021 UCY BP-01 SAND 78.44
7/4/2021 UCY BP-01 STONE 98.56
7/4/2021 UCY BP-01 O-BASF 8320 387.45
7/4/2021 UCY BP-02 CEMENT 1.64
7/4/2021 UCY BP-02 SAND 3.30
7/4/2021 UCY BP-02 STONE 4.15
7/4/2021 UCY BP-02 O-BASF 8320 16.40
7/4/2021 CEMENT
7/4/2021 SAND
7/4/2021 STONE
7/4/2021 O-BASF 8320
7/4/2021
21
SUBJOB RECORDER
S4000-C3S2-SUB CEMENT 67.24
S4000-C3S2-SUB SAND 140.43
S4000-C3S2-SUB STONE 172.73
S4000-C3S2-SUB SIKA 204 0.00
S4000-C3S4-SUB SIKA 3006 ES 10.48
S4000-C3S4-SUB O-BASF 8320 645.49
S4000-C3S4-SUB SIKA LATEX POWER 0.00
S4000-C3S4-SUB
33003-C3S1-ARC UCY BP-01
33003-C3S1-ARC CEMENT 49.90
33003-C3S1-ARC SAND 101.13
33003-C3S1-ARC STONE 125.37
33003-C3S2-ARC SIKA 204 0.00
33003-C3S2-ARC SIKA 3006 ES 0.00
33003-C3S2-ARC O-BASF 8320 496.65
33003-C3S2-ARC SIKA LATEX POWER 0.00
33003-C3S4-ARC
33003-C3S4-ARC CP-0602
33003-C3S4-ARC
33003-C3S4-ARC UCY BP-01
S4000-C3S3-SUB CEMENT 0.00
S4000-C3S3-SUB SAND 0.00
S4000-C3S3-SUB STONE 0.00
S4000-C3S3-SUB SIKA 204 0.00
28006-C3ML-SUB SIKA 3006 ES 0.00
28006-C3ML-SUB O-BASF 8320 0.00
28006-C3ML-SUB
28006-C3ML-SUB
S4000-C3S1-SUB CP-07
S4000-C3S1-SUB
S4000-C3S1-SUB UCY BP-01
S4000-C3S1-SUB CEMENT 38.75
20103-TRAFFICM SAND 78.44
20103-TRAFFICM STONE 98.56
20103-TRAFFICM SIKA 204 0.00
20103-TRAFFICM SIKA 3006 ES 0.00
S4000-C3S2-SUB O-BASF 8320 387.45
S4000-C3S2-SUB
S4000-C3S2-SUB
S4000-C3S2-SUB CP-03&04
28001-SP-A-SUP
28001-SP-A-SUP UCY BP-01
28001-SP-A-SUP CEMENT 11.15
28001-SP-A-SUP SAND 22.69
CP-07 STONE 26.81
CP-07 SIKA 204 0.00
CP-07 SIKA 3006 ES 0.00
CP-07 O-BASF 8320 109.20
CP-07 SIKA LATEX POWER 0.00
CP-07
CP-07
CP-07
CP-0602
CP-0603
CP-0604
CP-0605
QUANTITY
tons - UCY BP-01 UCY BP-02 total
tons CP-03&04 27 41.3 67.80
tons CP-07 94.5 4.00 98.50
kg CP-0602 0.00
kg
kg
kg

UCY BP-02 total


17.34 67.24 tons
39.30 140.43 tons
47.36 172.73 tons
0.00 0.00 kg
10.48 10.48 kg
148.84 645.49 kg
0.00 0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
UCY BP-02 total CP-07
0.00 0.00 tons O-BASF 8320
0.00 0.00 tons
0.00 0.00 tons
0.00 0.00 kg
0.00 0.00 kg
0.00 0.00 kg

UCY BP-02 total


1.64 40.39 tons
3.30 81.74 tons
4.15 102.71 tons
0.00 0.00 kg
0.00 0.00 kg
16.40 403.85 kg
UCY BP-02 total
15.70 26.85 tons
36.00 58.69 tons
43.21 70.02 tons
0.00 0.00 kg
10.48 10.48 kg
132.44 241.64 kg
0.00 0.00 kg
SIKA 3006 ES

O-BASF 8320
UCY BP 08/04/2021
Summary RQ
DATE Plant RQ NO Material QTY
8/4/2021 UCY BP-01 CEMENT 1.46
8/4/2021 UCY BP-01 SAND 3.46
8/4/2021 UCY BP-01 STONE 5.83
8/4/2021 UCY BP-01 O-BASF 8320 11.7
8/4/2021 UCY BP-01 CEMENT 1.23
8/4/2021 UCY BP-01 SAND 2.64
8/4/2021 UCY BP-01 STONE 3.14
8/4/2021 UCY BP-01 O-BASF 8320 11.07
8/4/2021 UCY BP-02 CEMENT 9.14
8/4/2021 UCY BP-02 SAND 19.53
8/4/2021 UCY BP-02 STONE 21.72
8/4/2021 UCY BP-02 O-BASF 8320 86.93
8/4/2021 UCY BP-02 CEMENT 11.475
8/4/2021 UCY BP-02 SAND 23.51
8/4/2021 UCY BP-02 STONE 28.02
8/4/2021 UCY BP-02 O-BASF 8320 111.8
8/4/2021 UCY BP-02 CEMENT 2.3
8/4/2021 UCY BP-02 SAND 9.5
8/4/2021 UCY BP-02 STONE 10.45
8/4/2021 UCY BP-02 O-BASF 8320 23
8/4/2021 UCY BP-02 CEMENT 1.27
8/4/2021 UCY BP-02 SAND 5.22
8/4/2021 UCY BP-02 STONE 5.75
8/4/2021 UCY BP-02 O-BASF 8320 12.65
8/4/2021 UCY BP-02 CEMENT 1.23
8/4/2021 UCY BP-02 SAND 2.64
8/4/2021 UCY BP-02 STONE 3.14
8/4/2021 UCY BP-02 O-BASF 8320 11.07
8/4/2021 UCY BP-02 CEMENT 1.70
8/4/2021 UCY BP-02 SAND 3.10
8/4/2021 UCY BP-02 STONE 3.80
8/4/2021 UCY BP-02 SIKA 3006 ES 10.21
8/4/2021 UCY BP-02 CEMENT 0.84
8/4/2021 UCY BP-02 SAND 1.69
8/4/2021 UCY BP-02 STONE 2.06
8/4/2021 UCY BP-02 O-BASF 8320 8.40
8/4/2021 UCY BP-01 CEMENT 52.07
8/4/2021 UCY BP-01 SAND 105.41
8/4/2021 UCY BP-01 STONE 132.21
8/4/2021 UCY BP-01 O-BASF 8320 520.70
8/4/2021 UCY BP-02 CEMENT 4.72
8/4/2021 UCY BP-02 SAND 9.55
8/4/2021 UCY BP-02 STONE 11.97
8/4/2021 UCY BP-02 O-BASF 8320 47.15
8/4/2021 UCY BP-02 CEMENT 51.31
8/4/2021 UCY BP-02 SAND 93.60
8/4/2021 UCY BP-02 STONE 119.47
8/4/2021 UCY BP-02 O-BASF 8320 298.86
021
SUBJOB RECORDER
S4000-C3S4-SUB CEMENT 138.75
S4000-C3S4-SUB SAND 279.85
S4000-C3S4-SUB STONE 347.56
S4000-C3S4-SUB SIKA 204 0.00
20103-TRAFFICM SIKA 3006 ES 10.21
20103-TRAFFICM O-BASF 8320 1143.33
20103-TRAFFICM SIKA LATEX POWER 0.00
20103-TRAFFICM
S4000-C3S4-SUB UCY BP-01
S4000-C3S4-SUB CEMENT 54.76
S4000-C3S4-SUB SAND 111.51
S4000-C3S4-SUB STONE 141.18
S4000-C3S2-SUB SIKA 204 0.00
S4000-C3S2-SUB SIKA 3006 ES 0.00
S4000-C3S2-SUB O-BASF 8320 543.47
S4000-C3S2-SUB SIKA LATEX POWER 0.00
S4000-C3S3-SUB
S4000-C3S3-SUB CP-0602
S4000-C3S3-SUB
S4000-C3S3-SUB UCY BP-01
S4000-C3S1-SUB CEMENT 0.00
S4000-C3S1-SUB SAND 0.00
S4000-C3S1-SUB STONE 0.00
S4000-C3S1-SUB SIKA 204 0.00
20103-TRAFFICM SIKA 3006 ES 0.00
20103-TRAFFICM O-BASF 8320 0.00
20103-TRAFFICM
20103-TRAFFICM
28001-SP-A-SUP CP-07
28001-SP-A-SUP
28001-SP-A-SUP UCY BP-01
28001-SP-A-SUP CEMENT 52.07
33003-C3S2-ARC SAND 105.41
33003-C3S2-ARC STONE 132.21
33003-C3S2-ARC SIKA 204 0.00
33003-C3S2-ARC SIKA 3006 ES 0.00
CP-07 O-BASF 8320 520.70
CP-07
CP-07
CP-07 CP-03&04
CP-07
CP-07 UCY BP-01
CP-07 CEMENT 2.69
CP-07 SAND 6.10
CP-0602 STONE 8.97
CP-0602 SIKA 204 0.00
CP-0602 SIKA 3006 ES 0.00
CP-0602 O-BASF 8320 22.77
SIKA LATEX POWER 0.00
QUANTITY
tons - UCY BP-01 UCY BP-02 total
tons CP-03&04 7.5 73.8 81.30
tons CP-07 127 11.50 138.50
kg CP-0602 113.5 113.50
kg
kg
kg

UCY BP-02 total


83.99 138.75 tons
168.34 279.85 tons
206.38 347.56 tons
0.00 0.00 kg
10.21 10.21 kg
599.86 1143.33 kg
0.00 0.00 kg
SIKA 204
SIKA 3006 ES
CP-0602
UCY BP-02 total CP-07
51.31 51.31 tons O-BASF 8320
93.60 93.60 tons
119.47 119.47 tons
0.00 0.00 kg
0.00 0.00 kg
298.86 298.86 kg

UCY BP-02 total


4.72 56.79 tons
9.55 114.96 tons
11.97 144.18 tons
0.00 0.00 kg
0.00 0.00 kg
47.15 567.85 kg
UCY BP-02 total
27.96 30.65 tons
65.19 71.29 tons
74.94 83.91 tons
0.00 0.00 kg
10.21 10.21 kg
253.85 276.62 kg
0.00 0.00 kg
UCY BP 09/04/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
9/4/2021 UCY BP-01 CEMENT 1.7 28001-SP-A-SUP
9/4/2021 UCY BP-01 SAND 3.11 28001-SP-A-SUP
9/4/2021 UCY BP-01 STONE 3.81 28001-SP-A-SUP
9/4/2021 UCY BP-01 SIKA 3006 ES 10.21 28001-SP-A-SUP
9/4/2021 UCY BP-01 CEMENT 1.3 S4000-C3S4-SUB
9/4/2021 UCY BP-01 SAND 3.08 S4000-C3S4-SUB
9/4/2021 UCY BP-01 STONE 5.18 S4000-C3S4-SUB
9/4/2021 UCY BP-01 O-BASF 8320 10.4 S4000-C3S4-SUB
9/4/2021 UCY BP-01 CEMENT 60.06 S4000-C4S8-SUB
9/4/2021 UCY BP-01 SAND 120.84 S4000-C4S8-SUB
9/4/2021 UCY BP-01 STONE 148.01 S4000-C4S8-SUB
9/4/2021 UCY BP-01 O-BASF 8320 600.6 S4000-C4S8-SUB
9/4/2021 UCY BP-02 CEMENT 2.46 20103-TRAFFICM
9/4/2021 UCY BP-02 SAND 5.3 20103-TRAFFICM
9/4/2021 UCY BP-02 STONE 6.27 20103-TRAFFICM
9/4/2021 UCY BP-02 O-BASF 8320 22.14 20103-TRAFFICM
9/4/2021 UCY BP-02 CEMENT 2.88 S4000-C3S3-SUB
9/4/2021 UCY BP-02 SAND 11.9 S4000-C3S3-SUB
9/4/2021 UCY BP-02 STONE 13.06 S4000-C3S3-SUB
9/4/2021 UCY BP-02 O-BASF 8320 28.75 S4000-C3S3-SUB
9/4/2021 UCY BP-02 CEMENT 73.71 S4000-C4S8-SUB
9/4/2021 UCY BP-02 SAND 148.3 S4000-C4S8-SUB
9/4/2021 UCY BP-02 STONE 181.64 S4000-C4S8-SUB
9/4/2021 UCY BP-02 O-BASF 8320 737.1 S4000-C4S8-SUB
9/4/2021 UCY BP-02 CEMENT 1.23 CP-07
9/4/2021 UCY BP-02 SAND 2.45 CP-07
9/4/2021 UCY BP-02 STONE 3.12 CP-07
9/4/2021 UCY BP-02 O-BASF 8320 12.30 CP-07
9/4/2021 UCY BP-01 CEMENT 14.75 CP-0602
9/4/2021 UCY BP-01 SAND 27.63 CP-0602
9/4/2021 UCY BP-01 STONE 35.12 CP-0602
9/4/2021 UCY BP-01 SIKA 3006 ES 81.90 CP-0602
RECORDER
CEMENT 158.09 tons -
SAND 322.61 tons CP-03&04
STONE 396.21 tons CP-07
SIKA 204 0.00 kg CP-0602
SIKA 3006 ES 92.11 kg
O-BASF 8320 1411.29 kg
SIKA LATEX POWER 0.00 kg

UCY BP-01 UCY BP-02 total


CEMENT 77.81 80.28 158.09 tons
SAND 154.66 167.95 322.61 tons
STONE 192.12 204.09 396.21 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 92.11 0.00 92.11 kg
O-BASF 8320 611.00 800.29 1411.29 kg
SIKA LATEX POWER 0.00 0.00 0.00 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 14.75 0.00 14.75 tons
SAND 27.63 0.00 27.63 tons
STONE 35.12 0.00 35.12 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 81.90 0.00 81.90 kg
O-BASF 8320 0.00 0.00 0.00 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 0.00 1.23 1.23 tons
SAND 0.00 2.45 2.45 tons
STONE 0.00 3.12 3.12 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 0.00 0.00 0.00 kg
O-BASF 8320 0.00 12.30 12.30 kg

CP-03&04
UCY BP-01 UCY BP-02 total
CEMENT 63.06 79.05 142.11 tons
SAND 127.03 165.50 292.53 tons
STONE 157.00 200.97 357.97 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 10.21 0.00 10.21 kg
O-BASF 8320 611.00 787.99 1398.99 kg
SIKA LATEX POWER 0.00 0.00 0.00 kg
QUANTITY
UCY BP-01 UCY BP-02 total
0 194 194.00
0 3.00 3.00
33.5 0 33.50

SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 10/04/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
10/4/2021 UCY BP-01 CEMENT 2.46 20103-TRAFFICM
10/4/2021 UCY BP-01 SAND 5.27 20103-TRAFFICM
10/4/2021 UCY BP-01 STONE 6.28 20103-TRAFFICM
10/4/2021 UCY BP-01 O-BASF 8320 22.14 20103-TRAFFICM
10/4/2021 UCY BP-01 CEMENT 0.82 28001-SP-A-SUP
10/4/2021 UCY BP-01 SAND 1.76 28001-SP-A-SUP
10/4/2021 UCY BP-01 STONE 2.09 28001-SP-A-SUP
10/4/2021 UCY BP-01 O-BASF 8320 7.38 28001-SP-A-SUP
10/4/2021 UCY BP-01 CEMENT 0.63 S4000-C3S3-SUB
10/4/2021 UCY BP-01 SAND 1.26 S4000-C3S3-SUB
10/4/2021 UCY BP-01 STONE 1.55 S4000-C3S3-SUB
10/4/2021 UCY BP-01 O-BASF 8320 6.3 S4000-C3S3-SUB
10/4/2021 UCY BP-01 CEMENT 4.55 S4000-C3S2-SUB
10/4/2021 UCY BP-01 SAND 9.56 S4000-C3S2-SUB
10/4/2021 UCY BP-01 STONE 11.09 S4000-C3S2-SUB
10/4/2021 UCY BP-01 O-BASF 8320 42.5 S4000-C3S2-SUB
10/4/2021 UCY BP-01 CEMENT 0.69 33003-C3ML-SUB
10/4/2021 UCY BP-01 SAND 2.84 33003-C3ML-SUB
10/4/2021 UCY BP-01 STONE 3.14 33003-C3ML-SUB
10/4/2021 UCY BP-01 O-BASF 8320 6.9 33003-C3ML-SUB
10/4/2021 UCY BP-02 CEMENT 9.36 S4000-C3S4-SUB
10/4/2021 UCY BP-02 SAND 18.94 S4000-C3S4-SUB
10/4/2021 UCY BP-02 STONE 22.26 S4000-C3S4-SUB
10/4/2021 UCY BP-02 O-BASF 8320 91.3 S4000-C3S4-SUB
10/4/2021 UCY BP-02 CEMENT 1.96 S4000-C3S3-SUB
10/4/2021 UCY BP-02 SAND 8.05 S4000-C3S3-SUB
10/4/2021 UCY BP-02 STONE 8.90 S4000-C3S3-SUB
10/4/2021 UCY BP-02 O-BASF 8320 19.55 S4000-C3S3-SUB
10/4/2021 UCY BP-02 CEMENT 43.05 CP-07
10/4/2021 UCY BP-02 SAND 86.94 CP-07
10/4/2021 UCY BP-02 STONE 109.31 CP-07
10/4/2021 UCY BP-02 O-BASF 8320 430.50 CP-07
10/4/2021 UCY BP-01 CEMENT 35.88 CP-0602
10/4/2021 UCY BP-01 SAND 64.27 CP-0602
10/4/2021 UCY BP-01 STONE 82.21 CP-0602
10/4/2021 UCY BP-01 O-BASF 8320 215.28 CP-0602
RECORDER
CEMENT 99.40 tons -
SAND 198.89 tons CP-03&04
STONE 246.83 tons CP-07
SIKA 204 0.00 kg CP-0602
SIKA 3006 ES 0.00 kg
O-BASF 8320 841.85 kg
SIKA LATEX POWER 0.00 kg

UCY BP-01 UCY BP-02 total


CEMENT 45.03 54.37 99.40 tons
SAND 84.96 113.93 198.89 tons
STONE 106.36 140.47 246.83 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 0.00 0.00 0.00 kg
O-BASF 8320 300.50 541.35 841.85 kg
SIKA LATEX POWER 0.00 0.00 0.00 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 35.88 0.00 35.88 tons
SAND 64.27 0.00 64.27 tons
STONE 82.21 0.00 82.21 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 0.00 0.00 0.00 kg
O-BASF 8320 215.28 0.00 215.28 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 0.00 43.05 43.05 tons
SAND 0.00 86.94 86.94 tons
STONE 0.00 109.31 109.31 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 0.00 0.00 0.00 kg
O-BASF 8320 0.00 430.50 430.50 kg

CP-03&04
UCY BP-01 UCY BP-02 total
CEMENT 9.15 11.32 20.47 tons
SAND 20.69 26.99 47.68 tons
STONE 24.15 31.16 55.31 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 0.00 0.00 0.00 kg
O-BASF 8320 85.22 110.85 196.07 kg
SIKA LATEX POWER 0.00 0.00 0.00 kg
QUANTITY
UCY BP-01 UCY BP-02 total
0 30 30.00
0 105.00 105.00
78 0 78.00

SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 11/04/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB RECORDER
11/4/2021 UCY BP-01 290166 CEMENT 1.23 20103-TRAFFICM
11/4/2021 UCY BP-01 290167 SAND 2.63 20103-TRAFFICM
11/4/2021 UCY BP-01 290168 STONE 3.15 20103-TRAFFICM
11/4/2021 UCY BP-01 290169 O-BASF 8320 11.07 20103-TRAFFICM
11/4/2021 UCY BP-02 290170 CEMENT 8.21 S4000-C3S4-SUB
11/4/2021 UCY BP-02 290171 SAND 16.82 S4000-C3S4-SUB
11/4/2021 UCY BP-02 290172 STONE 19.67 S4000-C3S4-SUB
11/4/2021 UCY BP-02 290173 O-BASF 8320 79.8 S4000-C3S4-SUB
11/4/2021 UCY BP-02 290174 CEMENT 1.23 20103-TRAFFICM
11/4/2021 UCY BP-02 290175 SAND 2.63 20103-TRAFFICM
11/4/2021 UCY BP-02 290176 STONE 3.15 20103-TRAFFICM
11/4/2021 UCY BP-02 290177 O-BASF 8320 11.07 20103-TRAFFICM
11/4/2021 UCY BP-02 290178 CEMENT 0.41 28001-SP-A-SUP
11/4/2021 UCY BP-02 290179 SAND 0.88 28001-SP-A-SUP
11/4/2021 UCY BP-02 290180 STONE 1.05 28001-SP-A-SUP
11/4/2021 UCY BP-02 290181 O-BASF 8320 3.69 28001-SP-A-SUP
11/4/2021 UCY BP-02 290182 CEMENT 0.69 33003-C3ML-SUB
11/4/2021 UCY BP-02 290183 SAND 2.84 33003-C3ML-SUB
11/4/2021 UCY BP-02 290184 STONE 3.15 33003-C3ML-SUB
11/4/2021 UCY BP-02 290185 O-BASF 8320 6.9 33003-C3ML-SUB
11/4/2021 UCY BP-02 290186 CEMENT 1.17 S4000-C3S2-SUB
11/4/2021 UCY BP-02 290187 SAND 2.45 S4000-C3S2-SUB
11/4/2021 UCY BP-02 290188 STONE 3.36 S4000-C3S2-SUB
11/4/2021 UCY BP-02 290189 O-BASF 8320 11 S4000-C3S2-SUB
11/4/2021 UCY BP-02 290190 CEMENT 0.42 S4000-C3S1-SUB
11/4/2021 UCY BP-02 290191 SAND 0.84 S4000-C3S1-SUB
11/4/2021 UCY BP-02 290192 STONE 1.04 S4000-C3S1-SUB
11/4/2021 UCY BP-02 290193 O-BASF 8320 4.20 S4000-C3S1-SUB
11/4/2021 UCY BP-02 290194 CEMENT 1.89 33003-C3S1-ARC
11/4/2021 UCY BP-02 290195 SAND 3.79 33003-C3S1-ARC
11/4/2021 UCY BP-02 290196 STONE 4.66 33003-C3S1-ARC
11/4/2021 UCY BP-02 290197 O-BASF 8320 18.90 33003-C3S1-ARC
11/4/2021 UCY BP-02 CEMENT 46.54 CP-07
11/4/2021 UCY BP-02 SAND 94.21 CP-07
11/4/2021 UCY BP-02 STONE 118.15 CP-07
11/4/2021 UCY BP-02 O-BASF 8320 465.35 CP-07
11/4/2021 UCY BP-01 CEMENT 60.72 CP-0602
11/4/2021 UCY BP-01 SAND 109.30 CP-0602
11/4/2021 UCY BP-01 STONE 138.86 CP-0602
11/4/2021 UCY BP-01 SIKA 3006 ES 364.32 CP-0602
11/4/2021 UCY BP-02 CEMENT 5.44 CP-0602
11/4/2021 UCY BP-02 SAND 11.56 CP-0602
11/4/2021 UCY BP-02 STONE 14.56 CP-0602
11/4/2021 UCY BP-02 SIKA 3006 ES 14.31 CP-0602
QUANTITY
CEMENT 127.95 tons - UCY BP-01
SAND 247.95 tons CP-03&04 0
STONE 310.80 tons CP-07 0
SIKA 204 0.00 kg CP-0602 132
SIKA 3006 ES 378.63 kg
O-BASF 8320 611.98 kg
SIKA LATEX POWER 0.00 kg

UCY BP-01 UCY BP-02 total


CEMENT 61.95 66.00 127.95 tons
SAND 111.93 136.02 247.95 tons
STONE 142.01 168.79 310.80 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 364.32 14.31 378.63 kg
O-BASF 8320 11.07 600.91 611.98 kg
SIKA LATEX POWER 0.00 0.00 0.00 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 60.72 5.44 66.16 tons
SAND 109.30 11.56 120.86 tons
STONE 138.86 14.56 153.42 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 364.32 14.31 378.63 kg
O-BASF 8320 0.00 0.00 0.00 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 0.00 46.54 46.54 tons
SAND 0.00 94.21 94.21 tons
STONE 0.00 118.15 118.15 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 0.00 0.00 0.00 kg
O-BASF 8320 0.00 465.35 465.35 kg

CP-03&04
UCY BP-01 UCY BP-02 total
CEMENT 1.23 14.02 15.25 tons
SAND 2.63 30.25 32.88 tons
STONE 3.15 36.08 39.23 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 0.00 0.00 0.00 kg
O-BASF 8320 11.07 135.56 146.63 kg
SIKA LATEX POWER 0.00 0.00 0.00 kg
UCY BP-02 total
35 35.00
113.50 113.50
13.6 145.60

SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 12/04/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
12/4/2021 UCY BP-01 283001 CEMENT 1.7 S4000-C3S4-SUB
12/4/2021 UCY BP-01 283002 SAND 4.36 S4000-C3S4-SUB
12/4/2021 UCY BP-01 283003 STONE 6.86 S4000-C3S4-SUB
12/4/2021 UCY BP-01 283004 O-BASF 8320 14 S4000-C3S4-SUB
12/4/2021 UCY BP-01 283005 CEMENT 0.69 28006-C3ML-SUB
12/4/2021 UCY BP-01 283006 SAND 1.25 28006-C3ML-SUB
12/4/2021 UCY BP-01 283007 STONE 1.55 28006-C3ML-SUB
12/4/2021 UCY BP-01 283008 O-BASF 8320 6.9 28006-C3ML-SUB
12/4/2021 UCY BP-01 283009 CEMENT 0.46 28004-C3ML-SUB
12/4/2021 UCY BP-01 283010 SAND 0.83 28004-C3ML-SUB
12/4/2021 UCY BP-01 283011 STONE 1.03 28004-C3ML-SUB
12/4/2021 UCY BP-01 283012 O-BASF 8320 4.6 28004-C3ML-SUB
12/4/2021 UCY BP-01 283013 CEMENT 0.84 24000-C3ML-SUB
12/4/2021 UCY BP-01 283014 SAND 1.92 24000-C3ML-SUB
12/4/2021 UCY BP-01 283015 STONE 2.31 24000-C3ML-SUB
12/4/2021 UCY BP-01 283016 O-BASF 8320 8.01 24000-C3ML-SUB
12/4/2021 UCY BP-01 283017 CEMENT 0.41 28001-SP-A-SUP
12/4/2021 UCY BP-01 283018 SAND 0.84 28001-SP-A-SUP
12/4/2021 UCY BP-01 283019 STONE 1.05 28001-SP-A-SUP
12/4/2021 UCY BP-01 283020 O-BASF 8320 3.69 28001-SP-A-SUP
12/4/2021 UCY BP-01 283021 CEMENT 1.23 20103-TRAFFICM
12/4/2021 UCY BP-01 283022 SAND 2.53 20103-TRAFFICM
12/4/2021 UCY BP-01 283023 STONE 3.15 20103-TRAFFICM
12/4/2021 UCY BP-01 283024 O-BASF 8320 11.07 20103-TRAFFICM
12/4/2021 UCY BP-02 283025 CEMENT 32.08 31002-C3S4-ARC
12/4/2021 UCY BP-02 283026 SAND 79.97 31002-C3S4-ARC
12/4/2021 UCY BP-02 283027 STONE 98.74 31002-C3S4-ARC
12/4/2021 UCY BP-02 283028 SIKA 204 445.90 31002-C3S4-ARC
12/4/2021 UCY BP-02 283029 CEMENT 1.23 20103-TRAFFICM
12/4/2021 UCY BP-02 283030 SAND 2.53 20103-TRAFFICM
12/4/2021 UCY BP-02 283031 STONE 3.15 20103-TRAFFICM
12/4/2021 UCY BP-02 283032 O-BASF 8320 11.07 20103-TRAFFICM
12/4/2021 UCY BP-02 283033 CEMENT 0.35 S4000-C3S1-SUB
12/4/2021 UCY BP-02 283034 SAND 1.41 S4000-C3S1-SUB
12/4/2021 UCY BP-02 283035 STONE 1.57 S4000-C3S1-SUB
12/4/2021 UCY BP-02 283036 O-BASF 8320 3.45 S4000-C3S1-SUB
12/4/2021 UCY BP-02 283037 CEMENT 0.69 28006-C3ML-SUB
12/4/2021 UCY BP-02 283038 SAND 1.25 28006-C3ML-SUB
12/4/2021 UCY BP-02 283039 STONE 1.55 28006-C3ML-SUB
12/4/2021 UCY BP-02 283040 O-BASF 8320 6.90 28006-C3ML-SUB
12/4/2021 UCY BP-01 CEMENT 37.72 CP-07
12/4/2021 UCY BP-01 SAND 75.90 CP-07
12/4/2021 UCY BP-01 STONE 95.96 CP-07
12/4/2021 UCY BP-01 O-BASF 8320 377.20 CP-07
12/4/2021 UCY BP-02 CEMENT 1.85 CP-07
12/4/2021 UCY BP-02 SAND 3.71 CP-07
12/4/2021 UCY BP-02 STONE 4.68 CP-07
12/4/2021 UCY BP-02 O-BASF 8320 18.45 CP-07
12/4/2021 UCY BP-01 CEMENT 13.97 CP-0602
12/4/2021 UCY BP-01 SAND 26.42 CP-0602
12/4/2021 UCY BP-01 STONE 33.41 CP-0602
12/4/2021 UCY BP-01 SIKA 3006 ES 77.70 CP-0602
RECORDER
CEMENT 93.22 tons -
SAND 202.92 tons CP-03&04
STONE 255.01 tons CP-07
SIKA 204 445.90 kg CP-0602
SIKA 3006 ES 77.70 kg
O-BASF 8320 465.34 kg
SIKA LATEX POWER 0.00 kg

UCY BP-01 UCY BP-02 total


CEMENT 57.02 36.20 93.22 tons
SAND 114.05 88.87 202.92 tons
STONE 145.32 109.69 255.01 tons
SIKA 204 0.00 445.90 445.90 kg
SIKA 3006 ES 77.70 0.00 77.70 kg
O-BASF 8320 425.47 39.87 465.34 kg
SIKA LATEX POWER 0.00 0.00 0.00 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 13.97 0.00 13.97 tons
SAND 26.42 0.00 26.42 tons
STONE 33.41 0.00 33.41 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 77.70 0.00 77.70 kg
O-BASF 8320 0.00 0.00 0.00 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 37.72 1.85 39.57 tons
SAND 75.90 3.71 79.61 tons
STONE 95.96 4.68 100.64 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 0.00 0.00 0.00 kg
O-BASF 8320 377.20 18.45 395.65 kg

CP-03&04
UCY BP-01 UCY BP-02 total
CEMENT 5.33 34.35 39.68 tons
SAND 11.73 85.16 96.89 tons
STONE 15.95 105.01 120.96 tons
SIKA 204 0.00 445.90 445.90 kg
SIKA 3006 ES 0.00 0.00 0.00 kg
O-BASF 8320 48.27 21.42 69.69 kg
SIKA LATEX POWER 0.00 0.00 0.00 kg
QUANTITY
UCY BP-01 UCY BP-02 total
14.2 97.5 14.20
92 4.50 96.50
31.7 0 31.70

SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 13/04/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
13/4/2021 UCY BP-01 293042 CEMENT 2.46 20103-TRAFFICM
13/4/2021 UCY BP-01 293043 SAND 5.26 20103-TRAFFICM
13/4/2021 UCY BP-01 293044 STONE 6.29 20103-TRAFFICM
13/4/2021 UCY BP-01 293045 O-BASF 8320 22.14 20103-TRAFFICM
13/4/2021 UCY BP-01 293046 CEMENT 5.69 S4000-C3S3-SUB
13/4/2021 UCY BP-01 293047 SAND 11.77 S4000-C3S3-SUB
13/4/2021 UCY BP-01 293048 STONE 13.42 S4000-C3S3-SUB
13/4/2021 UCY BP-01 293049 O-BASF 8320 54.6 S4000-C3S3-SUB
13/4/2021 UCY BP-01 293050 CEMENT 70.98 S4000-C4S9-SUB
13/4/2021 UCY BP-01 293051 SAND 142.64 S4000-C4S9-SUB
13/4/2021 UCY BP-01 293052 STONE 174.41 S4000-C4S9-SUB
13/4/2021 UCY BP-01 293053 O-BASF 8320 709.8 S4000-C4S9-SUB
13/4/2021 UCY BP-02 293054 CEMENT 5.9 S4000-C3S2-SUB
13/4/2021 UCY BP-02 293055 SAND 19.8 S4000-C3S2-SUB
13/4/2021 UCY BP-02 293056 STONE 22.46 S4000-C3S2-SUB
13/4/2021 UCY BP-02 293057 O-BASF 8320 58.95 S4000-C3S2-SUB
13/4/2021 UCY BP-02 293058 CEMENT 4.2 S4000-C3S3-SUB
13/4/2021 UCY BP-02 293059 SAND 8.44 S4000-C3S3-SUB
13/4/2021 UCY BP-02 293060 STONE 10.3 S4000-C3S3-SUB
13/4/2021 UCY BP-02 293061 O-BASF 8320 42 S4000-C3S3-SUB
13/4/2021 UCY BP-02 293062 CEMENT 49.14 S4000-C4S9-SUB
13/4/2021 UCY BP-02 293063 SAND 98.75 S4000-C4S9-SUB
13/4/2021 UCY BP-02 293064 STONE 120.51 S4000-C4S9-SUB
13/4/2021 UCY BP-02 293065 O-BASF 8320 491.4 S4000-C4S9-SUB
13/4/2021 UCY BP-01 CEMENT 27.06 CP-07
13/4/2021 UCY BP-01 SAND 54.78 CP-07
13/4/2021 UCY BP-01 STONE 68.90 CP-07
13/4/2021 UCY BP-01 O-BASF 8320 270.60 CP-07
13/4/2021 UCY BP-02 CEMENT 9.84 CP-07
13/4/2021 UCY BP-02 SAND 19.92 CP-07
13/4/2021 UCY BP-02 STONE 25.06 CP-07
13/4/2021 UCY BP-02 O-BASF 8320 98.40 CP-07
13/4/2021 UCY BP-01 CEMENT 4.64 CP-0602
13/4/2021 UCY BP-01 SAND 9.78 CP-0602
13/4/2021 UCY BP-01 STONE 12.25 CP-0602
13/4/2021 UCY BP-01 SIKA 3006 ES 20.88 CP-0602
13/4/2021 UCY BP-02 CEMENT 39.56 CP-0602
13/4/2021 UCY BP-02 SAND 70.61 CP-0602
13/4/2021 UCY BP-02 STONE 90.82 CP-0602
13/4/2021 UCY BP-02 SIKA 3006 ES 237.36 CP-0602
RECORDER
CEMENT 219.47 tons
SAND 441.75 tons
STONE 544.42 tons
SIKA 204 0.00 kg
SIKA 3006 ES 258.24 kg
O-BASF 8320 1747.89 kg
SIKA LATEX POWER 0.00 kg

UCY BP-01 UCY BP-02 total


CEMENT 110.83 108.64 219.47
SAND 224.23 217.52 441.75
STONE 275.27 269.15 544.42
SIKA 204 0.00 0.00 0.00
SIKA 3006 ES 20.88 237.36 258.24
O-BASF 8320 1057.14 690.75 1747.89
SIKA LATEX POWER 0.00 0.00 0.00

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 4.64 39.56 44.20
SAND 9.78 70.61 80.39
STONE 12.25 90.82 103.07
SIKA 204 0.00 0.00 0.00
SIKA 3006 ES 20.88 237.36 258.24
O-BASF 8320 0.00 0.00 0.00

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 27.06 9.84 36.90
SAND 54.78 19.92 74.70
STONE 68.90 25.06 93.96
SIKA 204 0.00 0.00 0.00
SIKA 3006 ES 0.00 0.00 0.00
O-BASF 8320 270.60 98.40 369.00

CP-03&04
UCY BP-01 UCY BP-02 total
CEMENT 79.13 59.24 138.37
SAND 159.67 126.99 286.66
STONE 194.12 153.27 347.39
SIKA 204 0.00 0.00 0.00
SIKA 3006 ES 0.00 0.00 0.00
O-BASF 8320 786.54 592.35 1378.89
SIKA LATEX POWER 0.00 0.00 0.00
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 188.5 148.5 337.00
CP-07 66 24.00 90.00
CP-0602 11.6 86 97.60

tons
tons
tons
kg
kg
kg
kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
tons O-BASF 8320
tons
tons
kg
kg
kg

tons
tons
tons
kg
kg
kg
tons
tons
tons
kg
kg
kg
kg
UCY BP 14/04/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
14/4/2021 UCY BP-02 293066 CEMENT 1.45 S4000-C3S4-SUB
14/4/2021 UCY BP-02 293067 SAND 3.38 S4000-C3S4-SUB
14/4/2021 UCY BP-02 293068 STONE 3.11 S4000-C3S4-SUB
14/4/2021 UCY BP-02 293069 O-BASF 8320 12.19 S4000-C3S4-SUB
14/4/2021 UCY BP-02 293070 CEMENT 0.84 33003-C3S1-ARC
14/4/2021 UCY BP-02 293071 SAND 1.68 33003-C3S1-ARC
14/4/2021 UCY BP-02 293072 STONE 2.07 33003-C3S1-ARC
14/4/2021 UCY BP-02 293073 O-BASF 8320 8.4 33003-C3S1-ARC
14/4/2021 UCY BP-02 293074 CEMENT 0.42 33003-C3S3-ARC
14/4/2021 UCY BP-02 293075 SAND 0.84 33003-C3S3-ARC
14/4/2021 UCY BP-02 293076 STONE 1.03 33003-C3S3-ARC
14/4/2021 UCY BP-02 293077 O-BASF 8320 4.2 33003-C3S3-ARC
14/4/2021 UCY BP-02 293078 CEMENT 2.76 S4000-C3S3-SUB
14/4/2021 UCY BP-02 293079 SAND 11.35 S4000-C3S3-SUB
14/4/2021 UCY BP-02 293080 STONE 12.59 S4000-C3S3-SUB
14/4/2021 UCY BP-02 293081 O-BASF 8320 27.6 S4000-C3S3-SUB
14/4/2021 UCY BP-02 293082 CEMENT 1.23 20103-TRAFFICM
14/4/2021 UCY BP-02 293083 SAND 2.63 20103-TRAFFICM
14/4/2021 UCY BP-02 293084 STONE 3.15 20103-TRAFFICM
14/4/2021 UCY BP-02 293085 O-BASF 8320 11.07 20103-TRAFFICM
14/4/2021 UCY BP-02 293086 CEMENT 0.49 28001-SP-A-SUP
14/4/2021 UCY BP-02 293087 SAND 1.05 28001-SP-A-SUP
14/4/2021 UCY BP-02 293088 STONE 1.26 28001-SP-A-SUP
14/4/2021 UCY BP-02 293089 O-BASF 8320 4.43 28001-SP-A-SUP
14/4/2021 UCY BP-01 CEMENT 8.61 CP-07
14/4/2021 UCY BP-01 SAND 17.41 CP-07
14/4/2021 UCY BP-01 STONE 21.88 CP-07
14/4/2021 UCY BP-01 O-BASF 8320 86.10 CP-07
14/4/2021 UCY BP-02 CEMENT 3.52 CP-0602
14/4/2021 UCY BP-02 SAND 7.47 CP-0602
14/4/2021 UCY BP-02 STONE 9.24 CP-0602
14/4/2021 UCY BP-02 SIKA 3006 ES 15.84 CP-0602
RECORDER
CEMENT 19.32 tons -
SAND 45.81 tons CP-03&04
STONE 54.33 tons CP-07
SIKA 204 0.00 kg CP-0602
SIKA 3006 ES 15.84 kg
O-BASF 8320 153.99 kg
SIKA LATEX POWER 0.00 kg

UCY BP-01 UCY BP-02 total


CEMENT 8.61 10.71 19.32 tons
SAND 17.41 28.40 45.81 tons
STONE 21.88 32.45 54.33 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 0.00 15.84 15.84 kg
O-BASF 8320 86.10 67.89 153.99 kg
SIKA LATEX POWER 0.00 0.00 0.00 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 0.00 3.52 3.52 tons
SAND 0.00 7.47 7.47 tons
STONE 0.00 9.24 9.24 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 0.00 15.84 15.84 kg
O-BASF 8320 0.00 0.00 0.00 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 8.61 0.00 8.61 tons
SAND 17.41 0.00 17.41 tons
STONE 21.88 0.00 21.88 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 0.00 0.00 0.00 kg
O-BASF 8320 86.10 0.00 86.10 kg

CP-03&04
UCY BP-01 UCY BP-02 total
CEMENT 0.00 7.19 7.19 tons
SAND 0.00 20.93 20.93 tons
STONE 0.00 23.21 23.21 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 0.00 0.00 0.00 kg
O-BASF 8320 0.00 67.89 67.89 kg
SIKA LATEX POWER 0.00 0.00 0.00 kg
QUANTITY
UCY BP-01 UCY BP-02 total
0 0 0.00
21 0.00 21.00
8.8 0 8.80

SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 15/04/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
15/4/2021 UCY BP-01 293089 CEMENT 1.23 20103-TRFFICM
15/4/2021 UCY BP-01 293090 SAND 2.64 20103-TRFFICM
15/4/2021 UCY BP-01 293091 STONE 3.15 20103-TRFFICM
15/4/2021 UCY BP-01 293092 O-BASF 8320 11.07 20103-TRFFICM
15/4/2021 UCY BP-01 293093 CEMENT 13.86 S4000-C3S2-SUB
15/4/2021 UCY BP-01 293094 SAND 28.41 S4000-C3S2-SUB
15/4/2021 UCY BP-01 293095 STONE 33.84 S4000-C3S2-SUB
15/4/2021 UCY BP-01 293096 O-BASF 8320 136.32 S4000-C3S2-SUB
15/4/2021 UCY BP-02 293097 CEMENT 2.25 S4000-C3S1-SUB
15/4/2021 UCY BP-02 293098 SAND 7.77 S4000-C3S1-SUB
15/4/2021 UCY BP-02 293099 STONE 9.15 S4000-C3S1-SUB
15/4/2021 UCY BP-02 293100 O-BASF 8320 21.75 S4000-C3S1-SUB
15/4/2021 UCY BP-02 293101 CEMENT 1.46 S4000-C3S3-SUB
15/4/2021 UCY BP-02 293102 SAND 3.45 S4000-C3S3-SUB
15/4/2021 UCY BP-02 293103 STONE 5.82 S4000-C3S3-SUB
15/4/2021 UCY BP-02 293104 O-BASF 8320 11.7 S4000-C3S3-SUB
15/4/2021 UCY BP-02 293105 CEMENT 1.72 28003-C3ML-SUB
15/4/2021 UCY BP-02 293106 SAND 3.69 28003-C3ML-SUB
15/4/2021 UCY BP-02 293107 STONE 4.41 28003-C3ML-SUB
15/4/2021 UCY BP-02 293108 O-BASF 8320 15.5 28003-C3ML-SUB
15/4/2021 UCY BP-02 293109 CEMENT 0.49 28001-SP-A-SUP
15/4/2021 UCY BP-02 293110 SAND 1.05 28001-SP-A-SUP
15/4/2021 UCY BP-02 293111 STONE 1.26 28001-SP-A-SUP
15/4/2021 UCY BP-02 293112 O-BASF 8320 4.43 28001-SP-A-SUP
15/4/2021 UCY BP-02 293113 CEMENT 0.25 S4000-C3S4-SUB
15/4/2021 UCY BP-02 293114 SAND 1.04 S4000-C3S4-SUB
15/4/2021 UCY BP-02 293115 STONE 1.16 S4000-C3S4-SUB
15/4/2021 UCY BP-02 293116 O-BASF 8320 2.53 S4000-C3S4-SUB
15/4/2021 UCY BP-01 CEMENT 35.67 CP-07
15/4/2021 UCY BP-01 SAND 71.95 CP-07
15/4/2021 UCY BP-01 STONE 90.92 CP-07
15/4/2021 UCY BP-01 O-BASF 8320 356.70 CP-07
15/4/2021 UCY BP-02 CEMENT 11.48 CP-07
15/4/2021 UCY BP-02 SAND 23.16 CP-07
15/4/2021 UCY BP-02 STONE 29.26 CP-07
15/4/2021 UCY BP-02 O-BASF 8320 114.80 CP-07
15/4/2021 UCY BP-01 CEMENT 3.61 CP-0602
15/4/2021 UCY BP-01 SAND 7.45 CP-0602
15/4/2021 UCY BP-01 STONE 9.29 CP-0602
15/4/2021 UCY BP-01 SIKA 3006 ES 15.84 CP-0602
15/4/2021 UCY BP-02 CEMENT 47.38 CP-0602
15/4/2021 UCY BP-02 SAND 84.98 CP-0602
15/4/2021 UCY BP-02 STONE 108.77 CP-0602
15/4/2021 UCY BP-02 SIKA 3006 ES 284.28 CP-0602
RECORDER
CEMENT 119.40 tons -
SAND 235.59 tons CP-03&04
STONE 297.03 tons CP-07
SIKA 204 0.00 kg CP-0602
SIKA 3006 ES 300.12 kg
O-BASF 8320 674.80 kg
SIKA LATEX POWER 0.00 kg

UCY BP-01 UCY BP-02 total


CEMENT 54.37 65.03 119.40 tons
SAND 110.45 125.14 235.59 tons
STONE 137.20 159.83 297.03 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 15.84 284.28 300.12 kg
O-BASF 8320 504.09 170.71 674.80 kg
SIKA LATEX POWER 0.00 0.00 0.00 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 3.61 47.38 50.99 tons
SAND 7.45 84.98 92.43 tons
STONE 9.29 108.77 118.06 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 15.84 284.28 300.12 kg
O-BASF 8320 0.00 0.00 0.00 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 35.67 11.48 47.15 tons
SAND 71.95 23.16 95.11 tons
STONE 90.92 29.26 120.18 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 0.00 0.00 0.00 kg
O-BASF 8320 356.70 114.80 471.50 kg

CP-03&04
UCY BP-01 UCY BP-02 total
CEMENT 15.09 6.17 21.26 tons
SAND 31.05 17.00 48.05 tons
STONE 36.99 21.80 58.79 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 0.00 0.00 0.00 kg
O-BASF 8320 147.39 55.91 203.30 kg
SIKA LATEX POWER 0.00 0.00 0.00 kg
QUANTITY
UCY BP-01 UCY BP-02 total
36.2 19.5 55.70
87 28.00 115.00
8.8 103 111.80

SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 16/04/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
16/4/2021 UCY BP-01 293117 CEMENT 3.03 S4000-C3S3-SUB
16/4/2021 UCY BP-01 293118 SAND 10.66 S4000-C3S3-SUB
16/4/2021 UCY BP-01 293119 STONE 12.02 S4000-C3S3-SUB
16/4/2021 UCY BP-01 293120 O-BASF 8320 30.25 S4000-C3S3-SUB
16/4/2021 UCY BP-01 293121 CEMENT 1.68 S4000-C3S1-SUB
16/4/2021 UCY BP-01 293122 SAND 3.36 S4000-C3S1-SUB
16/4/2021 UCY BP-01 293123 STONE 4.13 S4000-C3S1-SUB
16/4/2021 UCY BP-01 293124 O-BASF 8320 16.8 S4000-C3S1-SUB
16/4/2021 UCY BP-01 293125 CEMENT 0.63 S4000-C3S4-SUB
16/4/2021 UCY BP-01 293126 SAND 1.26 S4000-C3S4-SUB
16/4/2021 UCY BP-01 293127 STONE 1.55 S4000-C3S4-SUB
16/4/2021 UCY BP-01 293128 O-BASF 8320 6.3 S4000-C3S4-SUB
16/4/2021 UCY BP-01 293129 CEMENT 1.23 20103-TRAFFICM
16/4/2021 UCY BP-01 293130 SAND 2.63 20103-TRAFFICM
16/4/2021 UCY BP-01 293131 STONE 3.14 20103-TRAFFICM
16/4/2021 UCY BP-01 293132 O-BASF 8320 11.07 20103-TRAFFICM
16/4/2021 UCY BP-01 293133 CEMENT 1.72 28003-C3ML-SUB
16/4/2021 UCY BP-01 293134 SAND 3.68 28003-C3ML-SUB
16/4/2021 UCY BP-01 293135 STONE 4.4 28003-C3ML-SUB
16/4/2021 UCY BP-01 293136 O-BASF 8320 15.5 28003-C3ML-SUB
16/4/2021 UCY BP-02 293137 CEMENT 12.25 31002-C4S7-ARC
16/4/2021 UCY BP-02 293138 SAND 30.52 31002-C4S7-ARC
16/4/2021 UCY BP-02 293139 STONE 38.15 31002-C4S7-ARC
16/4/2021 UCY BP-02 293140 SIKA 204 171.5 31002-C4S7-ARC
16/4/2021 UCY BP-01 CEMENT 0.82 CP-07
16/4/2021 UCY BP-01 SAND 1.64 CP-07
16/4/2021 UCY BP-01 STONE 2.08 CP-07
16/4/2021 UCY BP-01 O-BASF 8320 8.20 CP-07
16/4/2021 UCY BP-02 CEMENT 19.68 CP-07
16/4/2021 UCY BP-02 SAND 39.74 CP-07
16/4/2021 UCY BP-02 STONE 50.06 CP-07
16/4/2021 UCY BP-02 O-BASF 8320 196.80 CP-07
16/4/2021 UCY BP-01 CEMENT 32.43 CP-0602
16/4/2021 UCY BP-01 SAND 58.09 CP-0603
16/4/2021 UCY BP-01 STONE 74.31 CP-0604
16/4/2021 UCY BP-01 SIKA 3006 ES 194.58 CP-0605
RECORDER
CEMENT 73.47 tons -
SAND 151.58 tons CP-03&04
STONE 189.84 tons CP-07
SIKA 204 171.50 kg CP-0602
SIKA 3006 ES 194.58 kg
O-BASF 8320 284.92 kg
SIKA LATEX POWER 0.00 kg

UCY BP-01 UCY BP-02 total


CEMENT 41.54 31.93 73.47 tons
SAND 81.32 70.26 151.58 tons
STONE 101.63 88.21 189.84 tons
SIKA 204 0.00 171.50 171.50 kg
SIKA 3006 ES 194.58 0.00 194.58 kg
O-BASF 8320 88.12 196.80 284.92 kg
SIKA LATEX POWER 0.00 0.00 0.00 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 32.43 0.00 32.43 tons
SAND 0.00 0.00 0.00 tons
STONE 0.00 0.00 0.00 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 0.00 0.00 0.00 kg
O-BASF 8320 0.00 0.00 0.00 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 0.82 19.68 20.50 tons
SAND 1.64 39.74 41.38 tons
STONE 2.08 50.06 52.14 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 0.00 0.00 0.00 kg
O-BASF 8320 8.20 196.80 205.00 kg

CP-03&04
UCY BP-01 UCY BP-02 total
CEMENT 8.29 12.25 20.54 tons
SAND 79.68 30.52 110.20 tons
STONE 99.55 38.15 137.70 tons
SIKA 204 0.00 171.50 171.50 kg
SIKA 3006 ES 194.58 0.00 194.58 kg
O-BASF 8320 79.92 0.00 79.92 kg
SIKA LATEX POWER 0.00 0.00 0.00 kg
QUANTITY
UCY BP-01 UCY BP-02 total
24.2 35 59.20
2 48.00 50.00
70.5 0 70.50

SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 17/04/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB RECORDER
17/4/2021 UCY BP-01 293141 CEMENT 7.49 S4000-C3S2-SUB
17/4/2021 UCY BP-01 293142 SAND 15.07 S4000-C3S2-SUB
17/4/2021 UCY BP-01 293143 STONE 17.56 S4000-C3S2-SUB
17/4/2021 UCY BP-01 293144 O-BASF 8320 72.6 S4000-C3S2-SUB
17/4/2021 UCY BP-01 293145 CEMENT 4.46 S4000-C3S1-SUB
17/4/2021 UCY BP-01 293146 SAND 12.56 S4000-C3S1-SUB
17/4/2021 UCY BP-01 293147 STONE 14.59 S4000-C3S1-SUB
17/4/2021 UCY BP-01 293148 O-BASF 8320 44.55 S4000-C3S1-SUB
17/4/2021 UCY BP-01 293149 CEMENT 0.42 S4000-C3S3-SUB
17/4/2021 UCY BP-01 293150 SAND 0.84 S4000-C3S3-SUB
17/4/2021 UCY BP-01 293151 STONE 1.03 S4000-C3S3-SUB
17/4/2021 UCY BP-01 293152 O-BASF 8320 4.2 S4000-C3S3-SUB
17/4/2021 UCY BP-02 293153 CEMENT 2.13 28003-C3ML-SUB
17/4/2021 UCY BP-02 293154 SAND 4.57 28003-C3ML-SUB
17/4/2021 UCY BP-02 293155 STONE 5.45 28003-C3ML-SUB
17/4/2021 UCY BP-02 293156 O-BASF 8320 19.19 28003-C3ML-SUB
17/4/2021 UCY BP-02 293157 CEMENT 1.23 20103-TRAFFICM
17/4/2021 UCY BP-02 293158 SAND 2.63 20103-TRAFFICM
17/4/2021 UCY BP-02 293159 STONE 3.15 20103-TRAFFICM
17/4/2021 UCY BP-02 293160 O-BASF 8320 11.07 20103-TRAFFICM
17/4/2021 UCY BP-02 293161 CEMENT 0.81 S4000-C3S4-SUB
17/4/2021 UCY BP-02 293162 SAND 1.91 S4000-C3S4-SUB
17/4/2021 UCY BP-02 293163 STONE 3.23 S4000-C3S4-SUB
17/4/2021 UCY BP-02 293164 O-BASF 8320 6.5 S4000-C3S4-SUB
17/4/2021 UCY BP-01 CEMENT 35.59 CP-07
17/4/2021 UCY BP-01 SAND 71.61 CP-07
17/4/2021 UCY BP-01 STONE 90.88 CP-07
17/4/2021 UCY BP-01 O-BASF 8320 355.88 CP-07
QUANTITY
CEMENT 52.13 tons - UCY BP-01
SAND 109.19 tons CP-03&04
STONE 135.89 tons CP-07
SIKA 204 0.00 kg CP-0602
SIKA 3006 ES 0.00 kg
O-BASF 8320 513.99 kg
SIKA LATEX POWER 0.00 kg

UCY BP-01 UCY BP-02 total


CEMENT 47.96 4.17 52.13 tons
SAND 100.08 9.11 109.19 tons
STONE 124.06 11.83 135.89 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 0.00 0.00 0.00 kg
O-BASF 8320 477.23 36.76 513.99 kg
SIKA LATEX POWER 0.00 0.00 0.00 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 0.00 0.00 0.00 tons
SAND 0.00 0.00 0.00 tons
STONE 0.00 0.00 0.00 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 0.00 0.00 0.00 kg
O-BASF 8320 0.00 0.00 0.00 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 35.59 0.00 35.59 tons
SAND 71.61 0.00 71.61 tons
STONE 90.88 0.00 90.88 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 0.00 0.00 0.00 kg
O-BASF 8320 355.88 0.00 355.88 kg

CP-03&04
UCY BP-01 UCY BP-02 total
CEMENT 12.37 4.17 16.54 tons
SAND 28.47 9.11 37.58 tons
STONE 33.18 11.83 45.01 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 0.00 0.00 0.00 kg
O-BASF 8320 121.35 36.76 158.11 kg
SIKA LATEX POWER 0.00 0.00 0.00 kg
UCY BP-02 total
0.00
0.00
0.00

SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 18/04/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
18/4/2021 UCY BP-01 293165 CEMENT 2.54 S4000-C3S3-SUB
18/4/2021 UCY BP-01 293166 SAND 5.44 S4000-C3S3-SUB
18/4/2021 UCY BP-01 293167 STONE 5.67 S4000-C3S3-SUB
18/4/2021 UCY BP-01 293168 O-BASF 8320 23.1 S4000-C3S3-SUB
18/4/2021 UCY BP-01 293169 CEMENT 1.47 S4000-C3S2-SUB
18/4/2021 UCY BP-01 293170 SAND 2.96 S4000-C3S2-SUB
18/4/2021 UCY BP-01 293171 STONE 3.61 S4000-C3S2-SUB
18/4/2021 UCY BP-01 293172 O-BASF 8320 14.7 S4000-C3S2-SUB
18/4/2021 UCY BP-01 293173 CEMENT 8.71 S4000-C3S4-SUB
18/4/2021 UCY BP-01 293174 SAND 17.66 S4000-C3S4-SUB
18/4/2021 UCY BP-01 293175 STONE 22.16 S4000-C3S4-SUB
18/4/2021 UCY BP-01 293176 O-BASF 8320 86.06 S4000-C3S4-SUB
18/4/2021 UCY BP-01 293177 CEMENT 1.38 28006-C3ML-SUB
18/4/2021 UCY BP-01 293178 SAND 2.52 28006-C3ML-SUB
18/4/2021 UCY BP-01 293179 STONE 3.09 28006-C3ML-SUB
18/4/2021 UCY BP-01 293180 O-BASF 8320 13.8 28006-C3ML-SUB
18/4/2021 UCY BP-01 293181 CEMENT 0.86 20106-TRAFFICM
18/4/2021 UCY BP-01 293182 SAND 2.18 20106-TRAFFICM
18/4/2021 UCY BP-01 293183 STONE 2.51 20106-TRAFFICM
18/4/2021 UCY BP-01 293184 O-BASF 8320 8.64 20106-TRAFFICM
18/4/2021 UCY BP-01 293185 CEMENT 6.48 31002-C4S7-ARC
18/4/2021 UCY BP-01 293186 SAND 16.08 31002-C4S7-ARC
18/4/2021 UCY BP-01 293187 STONE 20.07 31002-C4S7-ARC
18/4/2021 UCY BP-01 293188 SIKA 204 90.65 31002-C4S7-ARC
18/4/2021 UCY BP-02 293189 CEMENT 2.97 S4000-C3S4-SUB
18/4/2021 UCY BP-02 293190 SAND 6.66 S4000-C3S4-SUB
18/4/2021 UCY BP-02 293191 STONE 6.19 S4000-C3S4-SUB
18/4/2021 UCY BP-02 293192 O-BASF 8320 25.2 S4000-C3S4-SUB
18/4/2021 UCY BP-02 293193 CEMENT 5.87 S4000-C3S2-SUB
18/4/2021 UCY BP-02 293194 SAND 24.23 S4000-C3S2-SUB
18/4/2021 UCY BP-02 293195 STONE 26.70 S4000-C3S2-SUB
18/4/2021 UCY BP-02 293196 O-BASF 8320 58.65 S4000-C3S2-SUB
18/4/2021 UCY BP-02 293197 CEMENT 0.33 S4000-C3S1-SUB
18/4/2021 UCY BP-02 293198 SAND 0.77 S4000-C3S1-SUB
18/4/2021 UCY BP-02 293199 STONE 1.29 S4000-C3S1-SUB
18/4/2021 UCY BP-02 293200 O-BASF 8320 2.60 S4000-C3S1-SUB
18/4/2021 UCY BP-02 293201 CEMENT 1.23 20103-TRAFFICM
18/4/2021 UCY BP-02 293202 SAND 2.64 20103-TRAFFICM
18/4/2021 UCY BP-02 293203 STONE 3.14 20103-TRAFFICM
18/4/2021 UCY BP-02 293204 O-BASF 8320 11.07 20103-TRAFFICM
18/4/2021 UCY BP-02 293205 CEMENT 1.72 28003-C3ML-SUB
18/4/2021 UCY BP-02 293206 SAND 3.70 28003-C3ML-SUB
18/4/2021 UCY BP-02 293207 STONE 4.40 28003-C3ML-SUB
18/4/2021 UCY BP-02 293208 O-BASF 8320 15.50 28003-C3ML-SUB
18/4/2021 UCY BP-02 293209 CEMENT 0.49 28001-SP-A-SUP
18/4/2021 UCY BP-02 293210 SAND 1.06 28001-SP-A-SUP
18/4/2021 UCY BP-02 293211 STONE 1.25 28001-SP-A-SUP
18/4/2021 UCY BP-02 293212 O-BASF 8320 4.43 28001-SP-A-SUP
18/4/2021 UCY BP-01 CEMENT 36.29 CP-07
18/4/2021 UCY BP-01 SAND 73.63 CP-07
18/4/2021 UCY BP-01 STONE 91.77 CP-07
18/4/2021 UCY BP-01 O-BASF 8320 362.85 CP-07
18/4/2021 UCY BP-02 CEMENT 0.41 CP-07
18/4/2021 UCY BP-02 SAND 0.82 CP-07
18/4/2021 UCY BP-02 STONE 1.04 CP-07
18/4/2021 UCY BP-02 O-BASF 8320 4.10 CP-07
18/4/2021 UCY BP-02 CEMENT 49.01 CP-0602
18/4/2021 UCY BP-02 SAND 89.26 CP-0602
18/4/2021 UCY BP-02 STONE 118.07 CP-0602
18/4/2021 UCY BP-02 SIKA 3006 ES 287.17 CP-0602
RECORDER
CEMENT 119.76 tons
SAND 249.61 tons
STONE 310.96 tons
SIKA 204 90.65 kg
SIKA 3006 ES 287.17 kg
O-BASF 8320 630.70 kg
SIKA LATEX POWER 0.00 kg

UCY BP-01 UCY BP-02 total


CEMENT 57.73 62.03 119.76
SAND 120.47 129.14 249.61
STONE 148.88 162.08 310.96
SIKA 204 90.65 0.00 90.65
SIKA 3006 ES 0.00 287.17 287.17
O-BASF 8320 509.15 121.55 630.70
SIKA LATEX POWER 0.00 0.00 0.00

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 0.00 49.01 49.01
SAND 0.00 89.26 89.26
STONE 0.00 118.07 118.07
SIKA 204 0.00 0.00 0.00
SIKA 3006 ES 0.00 287.17 287.17
O-BASF 8320 0.00 0.00 0.00

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 36.29 0.41 36.70
SAND 73.63 0.82 74.45
STONE 91.77 1.04 92.81
SIKA 204 0.00 0.00 0.00
SIKA 3006 ES 0.00 0.00 0.00
O-BASF 8320 362.85 4.10 366.95

CP-03&04
UCY BP-01 UCY BP-02 total
CEMENT 21.44 12.61 34.05
SAND 46.84 39.06 85.90
STONE 57.11 42.97 100.08
SIKA 204 90.65 0.00 90.65
SIKA 3006 ES 0.00 0.00 0.00
O-BASF 8320 146.30 117.45 263.75
SIKA LATEX POWER 0.00 0.00 0.00
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 54.5 41.9 96.40
CP-07 88.5 1.00 89.50
CP-0602 0 107.7 107.70

tons
tons
tons
kg
kg
kg
kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
tons O-BASF 8320
tons
tons
kg
kg
kg

tons
tons
tons
kg
kg
kg
tons
tons
tons
kg
kg
kg
kg
UCY BP 19/04/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
19/4/2021 UCY BP-01 293214 CEMENT 1.23 20103-TRAFFICM
19/4/2021 UCY BP-01 293215 SAND 2.64 20103-TRAFFICM
19/4/2021 UCY BP-01 293216 STONE 3.14 20103-TRAFFICM
19/4/2021 UCY BP-01 293217 O-BASF 8320 11.07 20103-TRAFFICM
19/4/2021 UCY BP-01 293218 CEMENT 1.72 28003-C3ML-SUB
19/4/2021 UCY BP-01 293219 SAND 3.7 28003-C3ML-SUB
19/4/2021 UCY BP-01 293220 STONE 4.39 28003-C3ML-SUB
19/4/2021 UCY BP-01 293221 O-BASF 8320 15.5 28003-C3ML-SUB
19/4/2021 UCY BP-01 293222 CEMENT 1.97 S4000-C3S2-SUB
19/4/2021 UCY BP-01 293223 SAND 5.91 S4000-C3S2-SUB
19/4/2021 UCY BP-01 293224 STONE 6.76 S4000-C3S2-SUB
19/4/2021 UCY BP-01 293225 O-BASF 8320 19.7 S4000-C3S2-SUB
19/4/2021 UCY BP-01 293226 CEMENT 0.23 8532 I
19/4/2021 UCY BP-01 293227 SAND 0.95 8532 I
19/4/2021 UCY BP-01 293228 STONE 1.05 8532 I
19/4/2021 UCY BP-01 293229 O-BASF 8320 2.3 8532 I
19/4/2021 UCY BP-01 293230 CEMENT 0.49 28001-SP-A-SUP
19/4/2021 UCY BP-01 293231 SAND 1.06 28001-SP-A-SUP
19/4/2021 UCY BP-01 293232 STONE 1.26 28001-SP-A-SUP
19/4/2021 UCY BP-01 293233 O-BASF 8320 4.43 28001-SP-A-SUP
19/4/2021 UCY BP-02 293234 CEMENT 13.67 S4000-C3S3-SUB
19/4/2021 UCY BP-02 293235 SAND 26.94 S4000-C3S3-SUB
19/4/2021 UCY BP-02 293236 STONE 32.96 S4000-C3S3-SUB
19/4/2021 UCY BP-02 293237 O-BASF 8320 134.4 S4000-C3S3-SUB
19/4/2021 UCY BP-02 293238 CEMENT 1.03 S4000-C3S2-SUB
19/4/2021 UCY BP-02 293239 SAND 2.72 S4000-C3S2-SUB
19/4/2021 UCY BP-02 293240 STONE 3.22 S4000-C3S2-SUB
19/4/2021 UCY BP-02 293241 O-BASF 8320 6.5 S4000-C3S2-SUB
19/4/2021 UCY BP-02 293242 CEMENT 5.88 S4000-C3S1-SUB
19/4/2021 UCY BP-02 293243 SAND 11.79 S4000-C3S1-SUB
19/4/2021 UCY BP-02 293244 STONE 14.42 S4000-C3S1-SUB
19/4/2021 UCY BP-02 293245 O-BASF 8320 58.80 S4000-C3S1-SUB
19/4/2021 UCY BP-01 CEMENT 37.52 CP-07
19/4/2021 UCY BP-01 SAND 75.95 CP-07
19/4/2021 UCY BP-01 STONE 95.25 CP-07
19/4/2021 UCY BP-01 O-BASF 8320 375.15 CP-07
19/4/2021 UCY BP-02 CEMENT 2.46 CP-07
19/4/2021 UCY BP-02 SAND 4.96 CP-07
19/4/2021 UCY BP-02 STONE 6.22 CP-07
19/4/2021 UCY BP-02 O-BASF 8320 24.60 CP-07
19/4/2021 UCY BP-02 CEMENT 28.73 CP-0602
19/4/2021 UCY BP-02 SAND 52.50 CP-0602
19/4/2021 UCY BP-02 STONE 66.86 CP-0602
19/4/2021 UCY BP-02 SIKA 3006 ES 167.58 CP-0602
RECORDER
CEMENT 94.93 tons -
SAND 189.12 tons CP-03&04
STONE 235.53 tons CP-07
SIKA 204 0.00 kg CP-0602
SIKA 3006 ES 167.58 kg
O-BASF 8320 652.45 kg
SIKA LATEX POWER 0.00 kg

UCY BP-01 UCY BP-02 total


CEMENT 43.16 51.77 94.93 tons
SAND 90.21 98.91 189.12 tons
STONE 111.85 123.68 235.53 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 0.00 167.58 167.58 kg
O-BASF 8320 428.15 224.30 652.45 kg
SIKA LATEX POWER 0.00 0.00 0.00 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 0.00 28.73 28.73 tons
SAND 0.00 52.50 52.50 tons
STONE 0.00 66.86 66.86 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 0.00 167.58 167.58 kg
O-BASF 8320 0.00 0.00 0.00 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 37.52 2.46 39.98 tons
SAND 75.95 4.96 80.91 tons
STONE 95.25 6.22 101.47 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 0.00 0.00 0.00 kg
O-BASF 8320 375.15 24.60 399.75 kg

CP-03&04
UCY BP-01 UCY BP-02 total
CEMENT 5.64 20.58 26.22 tons
SAND 14.26 41.45 55.71 tons
STONE 16.60 50.60 67.20 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 0.00 0.00 0.00 kg
O-BASF 8320 53.00 199.70 252.70 kg
SIKA LATEX POWER 0.00 0.00 0.00 kg
QUANTITY
UCY BP-01 UCY BP-02 total
15.9 49.5 65.40
91.5 6.00 97.50
0 63.5 63.50

SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 20/04/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
20/4/2021 UCY BP-01 293246 CEMENT 2.54 S4000-C3S4-SUB
20/4/2021 UCY BP-01 293247 SAND 5.45 S4000-C3S4-SUB
20/4/2021 UCY BP-01 293248 STONE 5.7 S4000-C3S4-SUB
20/4/2021 UCY BP-01 293249 O-BASF 8320 23.1 S4000-C3S4-SUB
20/4/2021 UCY BP-01 293250 CEMENT 1.58 11303-LAB
20/4/2021 UCY BP-01 293251 SAND 3.87 11303-LAB
20/4/2021 UCY BP-01 293252 STONE 4.93 11303-LAB
20/4/2021 UCY BP-01 293253 SIKA 204 22.05 11303-LAB
20/4/2021 UCY BP-02 293254 CEMENT 2.75 S4000-C3S4-SUB
20/4/2021 UCY BP-02 293255 SAND 5.87 S4000-C3S4-SUB
20/4/2021 UCY BP-02 293256 STONE 6.18 S4000-C3S4-SUB
20/4/2021 UCY BP-02 293257 O-BASF 8320 25.2 S4000-C3S4-SUB
20/4/2021 UCY BP-02 293258 CEMENT 1.67 S4000-C3S1-SUB
20/4/2021 UCY BP-02 293259 SAND 3.47 S4000-C3S1-SUB
20/4/2021 UCY BP-02 293260 STONE 4.59 S4000-C3S1-SUB
20/4/2021 UCY BP-02 293261 O-BASF 8320 16.04 S4000-C3S1-SUB
20/4/2021 UCY BP-02 293262 CEMENT 2.76 S4000-C3S3-SUB
20/4/2021 UCY BP-02 293263 SAND 11.42 S4000-C3S3-SUB
20/4/2021 UCY BP-02 293264 STONE 12.55 S4000-C3S3-SUB
20/4/2021 UCY BP-02 293265 O-BASF 8320 27.6 S4000-C3S3-SUB
20/4/2021 UCY BP-02 293266 CEMENT 0.74 28001-SP-A-SUP
20/4/2021 UCY BP-02 293267 SAND 1.59 28001-SP-A-SUP
20/4/2021 UCY BP-02 293268 STONE 1.89 28001-SP-A-SUP
20/4/2021 UCY BP-02 293269 O-BASF 8320 6.64 28001-SP-A-SUP
20/4/2021 UCY BP-02 293270 CEMENT 1.23 20103-TRAFFICM
20/4/2021 UCY BP-02 293271 SAND 2.65 20103-TRAFFICM
20/4/2021 UCY BP-02 293272 STONE 3.13 20103-TRAFFICM
20/4/2021 UCY BP-02 293273 O-BASF 8320 11.07 20103-TRAFFICM
20/4/2021 UCY BP-02 293274 CEMENT 1.72 28003-C3ML-SUB
20/4/2021 UCY BP-02 293275 SAND 3.71 28003-C3ML-SUB
20/4/2021 UCY BP-02 293276 STONE 4.39 28003-C3ML-SUB
20/4/2021 UCY BP-02 293277 O-BASF 8320 15.50 28003-C3ML-SUB
20/4/2021 UCY BP-01 CEMENT 44.53 CP-07
20/4/2021 UCY BP-01 SAND 90.25 CP-07
20/4/2021 UCY BP-01 STONE 112.62 CP-07
20/4/2021 UCY BP-01 O-BASF 8320 445.26 CP-07
20/4/2021 UCY BP-02 CEMENT 47.59 CP-0602
20/4/2021 UCY BP-02 SAND 86.29 CP-0602
20/4/2021 UCY BP-02 STONE 110.03 CP-0602
20/4/2021 UCY BP-02 SIKA 3006 ES 280.74 CP-0602
RECORDER
CEMENT 107.11 tons
SAND 214.57 tons
STONE 266.01 tons
SIKA 204 22.05 kg
SIKA 3006 ES 280.74 kg
O-BASF 8320 570.41 kg
SIKA LATEX POWER 0.00 kg

UCY BP-01 UCY BP-02 total


CEMENT 48.65 58.46 107.11
SAND 99.57 115.00 214.57
STONE 123.25 142.76 266.01
SIKA 204 22.05 0.00 22.05
SIKA 3006 ES 0.00 280.74 280.74
O-BASF 8320 468.36 102.05 570.41
SIKA LATEX POWER 0.00 0.00 0.00

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 0.00 47.59 47.59
SAND 0.00 86.29 86.29
STONE 0.00 110.03 110.03
SIKA 204 0.00 0.00 0.00
SIKA 3006 ES 0.00 280.74 280.74
O-BASF 8320 0.00 0.00 0.00

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 44.53 0.00 44.53
SAND 90.25 0.00 90.25
STONE 112.62 0.00 112.62
SIKA 204 0.00 0.00 0.00
SIKA 3006 ES 0.00 0.00 0.00
O-BASF 8320 445.26 0.00 445.26

CP-03&04
UCY BP-01 UCY BP-02 total
CEMENT 4.12 10.87 14.99
SAND 9.32 28.71 38.03
STONE 10.63 32.73 43.36
SIKA 204 22.05 0.00 22.05
SIKA 3006 ES 0.00 0.00 0.00
O-BASF 8320 23.10 102.05 125.15
SIKA LATEX POWER 0.00 0.00 0.00
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 10.5 0 10.50
CP-07 108.6 0.00 108.60
CP-0602 0 104.5 104.50

tons
tons
tons
kg
kg
kg
kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
tons O-BASF 8320
tons
tons
kg
kg
kg

tons
tons
tons
kg
kg
kg
tons
tons
tons
kg
kg
kg
kg
UCY BP 21/04/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB RECORDER
21/4/2021 UCY BP-01 293278 CEMENT 1.3 S4000-C3S3-SUB
21/4/2021 UCY BP-01 293279 SAND 3.06 S4000-C3S3-SUB
21/4/2021 UCY BP-01 293280 STONE 5.14 S4000-C3S3-SUB
21/4/2021 UCY BP-01 293281 O-BASF 8320 10.4 S4000-C3S3-SUB
21/4/2021 UCY BP-01 293282 CEMENT 1.64 28001-SP-A-SUP
21/4/2021 UCY BP-01 293283 SAND 3.52 28001-SP-A-SUP
21/4/2021 UCY BP-01 293284 STONE 4.18 28001-SP-A-SUP
21/4/2021 UCY BP-01 293285 O-BASF 8320 14.76 28001-SP-A-SUP
21/4/2021 UCY BP-01 293286 CEMENT 17.64 S4000-C3S2-SUB
21/4/2021 UCY BP-01 293287 SAND 35.28 S4000-C3S2-SUB
21/4/2021 UCY BP-01 293288 STONE 43.43 S4000-C3S2-SUB
21/4/2021 UCY BP-01 293289 O-BASF 8320 176.4 S4000-C3S2-SUB
21/4/2021 UCY BP-01 293290 CEMENT 0.42 S4000-C3S1-SUB
21/4/2021 UCY BP-01 293291 SAND 0.84 S4000-C3S1-SUB
21/4/2021 UCY BP-01 293292 STONE 1.04 S4000-C3S1-SUB
21/4/2021 UCY BP-01 293293 O-BASF 8320 4.2 S4000-C3S1-SUB
21/4/2021 UCY BP-01 293294 CEMENT 8.19 S4000-C4S7-SUB
21/4/2021 UCY BP-01 293295 SAND 16.38 S4000-C4S7-SUB
21/4/2021 UCY BP-01 293296 STONE 20.16 S4000-C4S7-SUB
21/4/2021 UCY BP-01 293297 O-BASF 8320 81.9 S4000-C4S7-SUB
21/4/2021 UCY BP-02 293298 CEMENT 1.46 S4000-C3S3-SUB
21/4/2021 UCY BP-02 293299 SAND 3.45 S4000-C3S3-SUB
21/4/2021 UCY BP-02 293300 STONE 5.79 S4000-C3S3-SUB
21/4/2021 UCY BP-02 293301 O-BASF 8320 11.7 S4000-C3S3-SUB
21/4/2021 UCY BP-02 293302 CEMENT 1.98 S4000-C3S1-SUB
21/4/2021 UCY BP-02 293303 SAND 7.31 S4000-C3S1-SUB
21/4/2021 UCY BP-02 293304 STONE 8.71 S4000-C3S1-SUB
21/4/2021 UCY BP-02 293305 O-BASF 8320 18.85 S4000-C3S1-SUB
21/4/2021 UCY BP-02 293306 CEMENT 1.23 20103-TRAFFICM
21/4/2021 UCY BP-02 293307 SAND 2.64 20103-TRAFFICM
21/4/2021 UCY BP-02 293308 STONE 3.14 20103-TRAFFICM
21/4/2021 UCY BP-02 293309 O-BASF 8320 11.07 20103-TRAFFICM
21/4/2021 UCY BP-02 293310 CEMENT 0.72 20106-TRAFFICM
21/4/2021 UCY BP-02 293311 SAND 1.81 20106-TRAFFICM
21/4/2021 UCY BP-02 293312 STONE 2.09 20106-TRAFFICM
21/4/2021 UCY BP-02 293313 O-BASF 8320 7.20 20106-TRAFFICM
21/4/2021 UCY BP-02 293314 CEMENT 9.03 S4000-C3S2-SUB
21/4/2021 UCY BP-02 293315 SAND 18.67 S4000-C3S2-SUB
21/4/2021 UCY BP-02 293316 STONE 22.86 S4000-C3S2-SUB
21/4/2021 UCY BP-02 293317 O-BASF 8320 86.30 S4000-C3S2-SUB
21/4/2021 UCY BP-02 293318 CEMENT 21.84 S4000-C3S4-SUB
21/4/2021 UCY BP-02 293319 SAND 43.68 S4000-C3S4-SUB
21/4/2021 UCY BP-02 293320 STONE 53.77 S4000-C3S4-SUB
21/4/2021 UCY BP-02 293321 O-BASF 8320 218.40 S4000-C3S4-SUB
21/4/2021 UCY BP-01 CEMENT 27.47 CP-07
21/4/2021 UCY BP-01 SAND 55.21 CP-07
21/4/2021 UCY BP-01 STONE 69.81 CP-07
21/4/2021 UCY BP-01 O-BASF 8320 274.70 CP-07
21/4/2021 UCY BP-02 CEMENT 3.53 CP-07
21/4/2021 UCY BP-02 SAND 7.06 CP-07
21/4/2021 UCY BP-02 STONE 8.92 CP-07
21/4/2021 UCY BP-02 O-BASF 8320 35.26 CP-07
21/4/2021 UCY BP-02 CEMENT 3.52 CP-0602
21/4/2021 UCY BP-02 SAND 7.43 CP-0602
21/4/2021 UCY BP-02 STONE 9.25 CP-0602
21/4/2021 UCY BP-02 SIKA 3006 ES 15.84 CP-0602
QUANTITY
CEMENT 99.97 tons - UCY BP-01
SAND 206.34 tons CP-03&04 70.5
STONE 258.29 tons CP-07 67
SIKA 204 0.00 kg CP-0602 0
SIKA 3006 ES 15.84 kg
O-BASF 8320 951.14 kg
SIKA LATEX POWER 0.00 kg

UCY BP-01 UCY BP-02 total


CEMENT 56.66 43.31 99.97 tons
SAND 114.29 92.05 206.34 tons
STONE 143.76 114.53 258.29 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 0.00 15.84 15.84 kg
O-BASF 8320 562.36 388.78 951.14 kg
SIKA LATEX POWER 0.00 0.00 0.00 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 0.00 3.52 3.52 tons
SAND 0.00 7.43 7.43 tons
STONE 0.00 9.25 9.25 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 0.00 15.84 15.84 kg
O-BASF 8320 0.00 0.00 0.00 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 27.47 3.53 31.00 tons
SAND 55.21 7.06 62.27 tons
STONE 69.81 8.92 78.73 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 0.00 0.00 0.00 kg
O-BASF 8320 274.70 35.26 309.96 kg

CP-03&04
UCY BP-01 UCY BP-02 total
CEMENT 29.19 36.26 65.45 tons
SAND 59.08 77.56 136.64 tons
STONE 73.95 96.36 170.31 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 0.00 0.00 0.00 kg
O-BASF 8320 287.66 353.52 641.18 kg
SIKA LATEX POWER 0.00 0.00 0.00 kg
QUANTITY
UCY BP-02 total
91.5 162.00
8.60 75.60
8.8 8.80

SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 22/04/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
22/4/2021 UCY BP-01 293342 CEMENT 4.85 S4000-C3S1-SUB
22/4/2021 UCY BP-01 293343 SAND 10.04 S4000-C3S1-SUB
22/4/2021 UCY BP-01 293344 STONE 11.37 S4000-C3S1-SUB
22/4/2021 UCY BP-01 293345 O-BASF 8320 46.2 S4000-C3S1-SUB
22/4/2021 UCY BP-01 293346 CEMENT 13.24 S4000-C3S3-SUB
22/4/2021 UCY BP-01 293347 SAND 26.84 S4000-C3S3-SUB
22/4/2021 UCY BP-01 293348 STONE 32.02 S4000-C3S3-SUB
22/4/2021 UCY BP-01 293349 O-BASF 8320 130.2 S4000-C3S3-SUB
22/4/2021 UCY BP-01 293350 CEMENT 1.38 26101 C3ML-SUB
22/4/2021 UCY BP-01 293351 SAND 2.51 26101 C3ML-SUB
22/4/2021 UCY BP-01 293352 STONE 3.1 26101 C3ML-SUB
22/4/2021 UCY BP-01 293353 O-BASF 8320 13.8 26101 C3ML-SUB
22/4/2021 UCY BP-01 293354 CEMENT 4.2 S4000-C4S7-SUB
22/4/2021 UCY BP-01 293355 SAND 10.38 S4000-C4S7-SUB
22/4/2021 UCY BP-01 293356 STONE 13.09 S4000-C4S7-SUB
22/4/2021 UCY BP-01 293357 SIKA 204 58.8 S4000-C4S7-SUB
22/4/2021 UCY BP-02 293358 CEMENT 2.75 S4000-C3S4-SUB
22/4/2021 UCY BP-02 293359 SAND 5.84 S4000-C3S4-SUB
22/4/2021 UCY BP-02 293360 STONE 6.19 S4000-C3S4-SUB
22/4/2021 UCY BP-02 293361 O-BASF 8320 25.2 S4000-C3S4-SUB
22/4/2021 UCY BP-02 293362 CEMENT 1.23 20103-TRAFFICM
22/4/2021 UCY BP-02 293363 SAND 2.63 20103-TRAFFICM
22/4/2021 UCY BP-02 293364 STONE 3.15 20103-TRAFFICM
22/4/2021 UCY BP-02 293365 O-BASF 8320 11.07 20103-TRAFFICM
22/4/2021 UCY BP-02 293366 CEMENT 0.41 28001-SP-A-SUP
22/4/2021 UCY BP-02 293367 SAND 0.88 28001-SP-A-SUP
22/4/2021 UCY BP-02 293368 STONE 1.05 28001-SP-A-SUP
22/4/2021 UCY BP-02 293369 O-BASF 8320 3.69 28001-SP-A-SUP
22/4/2021 UCY BP-02 293370 CEMENT 1.72 28003-C3ML-SUB
22/4/2021 UCY BP-02 293371 SAND 3.69 28003-C3ML-SUB
22/4/2021 UCY BP-02 293372 STONE 4.41 28003-C3ML-SUB
22/4/2021 UCY BP-02 293373 O-BASF 8320 15.50 28003-C3ML-SUB
22/4/2021 UCY BP-02 293374 CEMENT 0.71 S4000-C3S1-SUB
22/4/2021 UCY BP-02 293375 SAND 1.43 S4000-C3S1-SUB
22/4/2021 UCY BP-02 293376 STONE 1.76 S4000-C3S1-SUB
22/4/2021 UCY BP-02 293377 O-BASF 8320 7.14 S4000-C3S1-SUB
22/4/2021 UCY BP-01 CEMENT 30.14 CP-07
22/4/2021 UCY BP-01 SAND 61.01 CP-07
22/4/2021 UCY BP-01 STONE 76.22 CP-07
22/4/2021 UCY BP-01 O-BASF 8320 301.35 CP-07
22/4/2021 UCY BP-02 CEMENT 47.13 CP-0602
22/4/2021 UCY BP-02 SAND 85.46 CP-0602
22/4/2021 UCY BP-02 STONE 108.89 CP-0602
22/4/2021 UCY BP-02 SIKA 3006 ES 277.98 CP-0602
RECORDER QUANTITY
CEMENT 107.76 tons -
SAND 210.71 tons CP-03&04
STONE 261.25 tons CP-07
SIKA 204 58.80 kg CP-0602
SIKA 3006 ES 277.98 kg
O-BASF 8320 554.15 kg
SIKA LATEX POWER 0.00 kg

UCY BP-01 UCY BP-02 total


CEMENT 53.81 53.95 107.76 tons
SAND 110.78 99.93 210.71 tons
STONE 135.80 125.45 261.25 tons
SIKA 204 58.80 0.00 58.80 kg
SIKA 3006 ES 0.00 277.98 277.98 kg
O-BASF 8320 491.55 62.60 554.15 kg
SIKA LATEX POWER 0.00 0.00 0.00 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 0.00 47.13 47.13 tons
SAND 0.00 85.46 85.46 tons
STONE 0.00 108.89 108.89 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 0.00 277.98 277.98 kg
O-BASF 8320 0.00 0.00 0.00 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 30.14 0.00 30.14 tons
SAND 61.01 0.00 61.01 tons
STONE 76.22 0.00 76.22 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 0.00 0.00 0.00 kg
O-BASF 8320 301.35 0.00 301.35 kg

CP-03&04
UCY BP-01 UCY BP-02 total
CEMENT 23.67 6.82 30.49 tons
SAND 49.77 14.47 64.24 tons
STONE 59.58 16.56 76.14 tons
SIKA 204 58.80 0.00 58.80 kg
SIKA 3006 ES 0.00 0.00 0.00 kg
O-BASF 8320 190.20 62.60 252.80 kg
SIKA LATEX POWER 0.00 0.00 0.00 kg
QUANTITY
UCY BP-01 UCY BP-02 total
58.0 0 58.00
73.5 0.00 73.50
0 103.5 103.50

SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 23/04/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
23/4/2021 UCY BP-01 293322 CEMENT 2.46 20103-TRAFICM
23/4/2021 UCY BP-01 293323 SAND 5.25 20103-TRAFICM
23/4/2021 UCY BP-01 293324 STONE 6.29 20103-TRAFICM
23/4/2021 UCY BP-01 293325 O-BASF 8320 22.14 20103-TRAFICM
23/4/2021 UCY BP-01 293326 CEMENT 0.65 S4000-C3S1-SUB
23/4/2021 UCY BP-01 293327 SAND 1.52 S4000-C3S1-SUB
23/4/2021 UCY BP-01 293328 STONE 2.58 S4000-C3S1-SUB
23/4/2021 UCY BP-01 293329 O-BASF 8320 5.2 S4000-C3S1-SUB
23/4/2021 UCY BP-01 293330 CEMENT 1.7 S4000-C3S4-SUB
23/4/2021 UCY BP-01 293331 SAND 3.73 S4000-C3S4-SUB
23/4/2021 UCY BP-01 293332 STONE 3.62 S4000-C3S4-SUB
23/4/2021 UCY BP-01 293333 O-BASF 8320 14.7 S4000-C3S4-SUB
23/4/2021 UCY BP-01 293334 CEMENT 60.06 S4000-C4S6-SUB
23/4/2021 UCY BP-01 293335 SAND 119.84 S4000-C4S6-SUB
23/4/2021 UCY BP-01 293336 STONE 147.71 S4000-C4S6-SUB
23/4/2021 UCY BP-01 293337 O-BASF 8320 600.6 S4000-C4S6-SUB
23/4/2021 UCY BP-02 293338 CEMENT 68.25 S4000-C4S6-SUB
23/4/2021 UCY BP-02 293339 SAND 136.18 S4000-C4S6-SUB
23/4/2021 UCY BP-02 293340 STONE 167.86 S4000-C4S6-SUB
23/4/2021 UCY BP-02 293341 O-BASF 8320 682.5 S4000-C4S6-SUB
23/4/2021 UCY BP-01 CEMENT 1.85 CP-07
23/4/2021 UCY BP-01 SAND 3.71 CP-07
23/4/2021 UCY BP-01 STONE 4.76 CP-07
23/4/2021 UCY BP-01 O-BASF 8320 18.45 CP-07
RECORDER
CEMENT 134.97 tons
SAND 270.23 tons
STONE 332.82 tons
SIKA 204 0.00 kg
SIKA 3006 ES 0.00 kg
O-BASF 8320 1343.59 kg
SIKA LATEX POWER 0.00 kg

UCY BP-01 UCY BP-02 total


CEMENT 66.72 68.25 134.97
SAND 134.05 136.18 270.23
STONE 164.96 167.86 332.82
SIKA 204 0.00 0.00 0.00
SIKA 3006 ES 0.00 0.00 0.00
O-BASF 8320 661.09 682.50 1343.59
SIKA LATEX POWER 0.00 0.00 0.00

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 0.00 0.00 0.00
SAND 0.00 0.00 0.00
STONE 0.00 0.00 0.00
SIKA 204 0.00 0.00 0.00
SIKA 3006 ES 0.00 0.00 0.00
O-BASF 8320 0.00 0.00 0.00

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 1.85 0.00 1.85
SAND 3.71 0.00 3.71
STONE 4.76 0.00 4.76
SIKA 204 0.00 0.00 0.00
SIKA 3006 ES 0.00 0.00 0.00
O-BASF 8320 18.45 0.00 18.45

CP-03&04
UCY BP-01 UCY BP-02 total
CEMENT 64.87 68.25 133.12
SAND 130.34 136.18 266.52
STONE 160.20 167.86 328.06
SIKA 204 0.00 0.00 0.00
SIKA 3006 ES 0.00 0.00 0.00
O-BASF 8320 642.64 682.50 1325.14
SIKA LATEX POWER 0.00 0.00 0.00
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 155.0 0 155.00
CP-07 4.5 0.00 4.50
CP-0602 0 0 0.00

tons
tons
tons
kg
kg
kg
kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
tons O-BASF 8320
tons
tons
kg
kg
kg

tons
tons
tons
kg
kg
kg
tons
tons
tons
kg
kg
kg
kg
UCY BP 24/04/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
24/4/2021 UCY BP-01 293378 CEMENT 1.68 S4000-C3S1-SUB
24/4/2021 UCY BP-01 293379 SAND 3.35 S4000-C3S1-SUB
24/4/2021 UCY BP-01 293380 STONE 4.13 S4000-C3S1-SUB
24/4/2021 UCY BP-01 293381 O-BASF 8320 16.8 S4000-C3S1-SUB
24/4/2021 UCY BP-01 293382 CEMENT 3.24 S4000-C3S3-SUB
24/4/2021 UCY BP-01 293383 SAND 6.86 S4000-C3S3-SUB
24/4/2021 UCY BP-01 293384 STONE 9.68 S4000-C3S3-SUB
24/4/2021 UCY BP-01 293385 O-BASF 8320 30.1 S4000-C3S3-SUB
24/4/2021 UCY BP-01 293386 CEMENT 0.82 28001-SP-A-SUP
24/4/2021 UCY BP-01 293387 SAND 1.75 28001-SP-A-SUP
24/4/2021 UCY BP-01 293388 STONE 2.1 28001-SP-A-SUP
24/4/2021 UCY BP-01 293389 O-BASF 8320 7.38 28001-SP-A-SUP
24/4/2021 UCY BP-02 293390 CEMENT 3.38 S4000-C3S3-SUB
24/4/2021 UCY BP-02 293391 SAND 7.08 S4000-C3S3-SUB
24/4/2021 UCY BP-02 293392 STONE 7.74 S4000-C3S3-SUB
24/4/2021 UCY BP-02 293393 O-BASF 8320 31.5 S4000-C3S3-SUB
24/4/2021 UCY BP-02 293394 CEMENT 2.31 S4000-C3S2-SUB
24/4/2021 UCY BP-02 293395 SAND 4.61 S4000-C3S2-SUB
24/4/2021 UCY BP-02 293396 STONE 5.68 S4000-C3S2-SUB
24/4/2021 UCY BP-02 293397 O-BASF 8320 23.1 S4000-C3S2-SUB
24/4/2021 UCY BP-02 293398 CEMENT 1.18 S4000-C3S1-SUB
24/4/2021 UCY BP-02 293399 SAND 2.34 S4000-C3S1-SUB
24/4/2021 UCY BP-02 293400 STONE 2.9 S4000-C3S1-SUB
24/4/2021 UCY BP-02 294401 O-BASF 8320 11.76 S4000-C3S1-SUB
24/4/2021 UCY BP-02 294402 CEMENT 2.46 20103-TRAFFICM
24/4/2021 UCY BP-02 294403 SAND 5.29 20103-TRAFFICM
24/4/2021 UCY BP-02 294404 STONE 6.28 20103-TRAFFICM
24/4/2021 UCY BP-02 294405 O-BASF 8320 22.14 20103-TRAFFICM
24/4/2021 UCY BP-02 294406 CEMENT 1.72 28003-C3ML-SUB
24/4/2021 UCY BP-02 294407 SAND 3.70 28003-C3ML-SUB
24/4/2021 UCY BP-02 294408 STONE 4.39 28003-C3ML-SUB
24/4/2021 UCY BP-02 294409 O-BASF 8320 15.50 28003-C3ML-SUB
24/4/2021 UCY BP-02 294410 CEMENT 1.15 28006-C3ML-SUB
24/4/2021 UCY BP-02 294411 SAND 2.08 28006-C3ML-SUB
24/4/2021 UCY BP-02 294412 STONE 2.58 28006-C3ML-SUB
24/4/2021 UCY BP-02 294413 O-BASF 8320 11.50 28006-C3ML-SUB
24/4/2021 UCY BP-01 CEMENT 1.85 CP-07
24/4/2021 UCY BP-01 SAND 3.70 CP-07
24/4/2021 UCY BP-01 STONE 4.70 CP-07
24/4/2021 UCY BP-01 O-BASF 8320 18.45 CP-07
24/4/2021 UCY BP-02 CEMENT 12.06 CP-07
24/4/2021 UCY BP-02 SAND 25.25 CP-07
24/4/2021 UCY BP-02 STONE 31.78 CP-07
24/4/2021 UCY BP-02 O-BASF 8320 125.05 CP-07
24/4/2021 UCY BP-02 CEMENT 29.68 CP-0602
24/4/2021 UCY BP-02 SAND 54.26 CP-0602
24/4/2021 UCY BP-02 STONE 68.91 CP-0602
24/4/2021 UCY BP-02 SIKA 3006 ES 173.58 CP-0602
RECORDER
CEMENT 61.53 tons -
SAND 120.27 tons CP-03&04
STONE 150.87 tons CP-07
SIKA 204 0.00 kg CP-0602
SIKA 3006 ES 173.58 kg
O-BASF 8320 313.28 kg
SIKA LATEX POWER 0.00 kg

UCY BP-01 UCY BP-02 total


CEMENT 7.59 53.94 61.53 tons
SAND 15.66 104.61 120.27 tons
STONE 20.61 130.26 150.87 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 0.00 173.58 173.58 kg
O-BASF 8320 72.73 240.55 313.28 kg
SIKA LATEX POWER 0.00 0.00 0.00 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 0.00 29.68 29.68 tons
SAND 0.00 54.26 54.26 tons
STONE 0.00 68.91 68.91 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 0.00 173.58 173.58 kg
O-BASF 8320 0.00 0.00 0.00 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 1.85 12.06 13.91 tons
SAND 3.70 25.25 28.95 tons
STONE 4.70 31.78 36.48 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 0.00 0.00 0.00 kg
O-BASF 8320 18.45 125.05 143.50 kg

CP-03&04
UCY BP-01 UCY BP-02 total
CEMENT 5.74 12.20 17.94 tons
SAND 11.96 25.10 37.06 tons
STONE 15.91 29.57 45.48 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 0.00 0.00 0.00 kg
O-BASF 8320 54.28 115.50 169.78 kg
SIKA LATEX POWER 0.00 0.00 0.00 kg
QUANTITY
UCY BP-01 UCY BP-02 total
14.5 29 43.50
4.5 30.50 35.00
0 65.5 65.50

SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 25/04/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
25/4/2021 UCY BP-01 294414 CEMENT 2.54 S4000-C3S3-SUB
25/4/2021 UCY BP-01 294415 SAND 5.44 S4000-C3S3-SUB
25/4/2021 UCY BP-01 294416 STONE 5.68 S4000-C3S3-SUB
25/4/2021 UCY BP-01 294417 O-BASF 8320 23.1 S4000-C3S3-SUB
25/4/2021 UCY BP-01 294418 CEMENT 2.76 S4000-C3S4-SUB
25/4/2021 UCY BP-01 294419 SAND 6.24 S4000-C3S4-SUB
25/4/2021 UCY BP-01 294420 STONE 5.67 S4000-C3S4-SUB
25/4/2021 UCY BP-01 294421 O-BASF 8320 23.1 S4000-C3S4-SUB
25/4/2021 UCY BP-01 294422 CEMENT 1.23 20103-TRAFFICM
25/4/2021 UCY BP-01 294423 SAND 2.63 20103-TRAFFICM
25/4/2021 UCY BP-01 294424 STONE 3.14 20103-TRAFFICM
25/4/2021 UCY BP-01 294425 O-BASF 8320 11.07 20103-TRAFFICM
25/4/2021 UCY BP-01 294426 CEMENT 18.2 33003-C3S4-SUB
25/4/2021 UCY BP-01 294427 SAND 45.24 33003-C3S4-SUB
25/4/2021 UCY BP-01 294428 STONE 56.63 33003-C3S4-SUB
25/4/2021 UCY BP-01 294429 SIKA 204 254.8 33003-C3S4-SUB
25/4/2021 UCY BP-01 294430 CEMENT 0.42 S4000-C3S2-SUB
25/4/2021 UCY BP-01 294431 SAND 0.84 S4000-C3S2-SUB
25/4/2021 UCY BP-01 294432 STONE 1.03 S4000-C3S2-SUB
25/4/2021 UCY BP-01 294433 O-BASF 8320 4.2 S4000-C3S2-SUB
25/4/2021 UCY BP-02 294434 CEMENT 2.76 S4000-C3S2-SUB
25/4/2021 UCY BP-02 294435 SAND 11.33 S4000-C3S2-SUB
25/4/2021 UCY BP-02 294436 STONE 12.56 S4000-C3S2-SUB
25/4/2021 UCY BP-02 294437 O-BASF 8320 27.6 S4000-C3S2-SUB
25/4/2021 UCY BP-02 294438 CEMENT 2.76 S4000-C3S3-SUB
25/4/2021 UCY BP-02 294439 SAND 10.61 S4000-C3S3-SUB
25/4/2021 UCY BP-02 294440 STONE 11.83 S4000-C3S3-SUB
25/4/2021 UCY BP-02 294441 O-BASF 8320 27.68 S4000-C3S3-SUB
25/4/2021 UCY BP-02 294442 CEMENT 1.72 28003-C3ML-SUB
25/4/2021 UCY BP-02 294443 SAND 3.70 28003-C3ML-SUB
25/4/2021 UCY BP-02 294444 STONE 4.40 28003-C3ML-SUB
25/4/2021 UCY BP-02 294445 O-BASF 8320 15.50 28003-C3ML-SUB
25/4/2021 UCY BP-02 294446 CEMENT 0.82 28001-SP-A-SUP
25/4/2021 UCY BP-02 294447 SAND 1.76 28001-SP-A-SUP
25/4/2021 UCY BP-02 294448 STONE 2.10 28001-SP-A-SUP
25/4/2021 UCY BP-02 294449 O-BASF 8320 7.38 28001-SP-A-SUP
25/4/2021 UCY BP-02 294450 CEMENT 1.23 20103-TRAFFICM
25/4/2021 UCY BP-02 294451 SAND 2.64 20103-TRAFFICM
25/4/2021 UCY BP-02 294452 STONE 3.14 20103-TRAFFICM
25/4/2021 UCY BP-02 294453 O-BASF 8320 11.07 20103-TRAFFICM
25/4/2021 UCY BP-02 294454 CEMENT 8.19 S4000-C4S8-SUB
25/4/2021 UCY BP-02 294455 SAND 16.44 S4000-C4S8-SUB
25/4/2021 UCY BP-02 294456 STONE 20.12 S4000-C4S8-SUB
25/4/2021 UCY BP-02 294457 O-BASF 8320 81.90 S4000-C4S8-SUB
25/4/2021 UCY BP-01 CEMENT 17.02 CP-07
25/4/2021 UCY BP-01 SAND 34.11 CP-07
25/4/2021 UCY BP-01 STONE 43.41 CP-07
25/4/2021 UCY BP-01 O-BASF 8320 170.15 CP-07
25/4/2021 UCY BP-02 CEMENT 7.38 CP-07
25/4/2021 UCY BP-02 SAND 14.90 CP-07
25/4/2021 UCY BP-02 STONE 18.76 CP-07
25/4/2021 UCY BP-02 O-BASF 8320 73.80 CP-07
25/4/2021 UCY BP-02 CEMENT 39.17 CP-0602
25/4/2021 UCY BP-02 SAND 71.65 CP-0602
25/4/2021 UCY BP-02 STONE 90.79 CP-0602
25/4/2021 UCY BP-02 SIKA 3006 ES 229.74 CP-0602
RECORDER
CEMENT 106.20 tons
SAND 227.53 tons
STONE 279.26 tons
SIKA 204 254.80 kg
SIKA 3006 ES 229.74 kg
O-BASF 8320 476.55 kg
SIKA LATEX POWER 0.00 kg

UCY BP-01 UCY BP-02 total


CEMENT 42.17 64.03 106.20
SAND 94.50 133.03 227.53
STONE 115.56 163.70 279.26
SIKA 204 254.80 0.00 254.80
SIKA 3006 ES 0.00 229.74 229.74
O-BASF 8320 231.62 244.93 476.55
SIKA LATEX POWER 0.00 0.00 0.00

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 0.00 39.17 39.17
SAND 0.00 71.65 71.65
STONE 0.00 90.79 90.79
SIKA 204 0.00 0.00 0.00
SIKA 3006 ES 0.00 229.74 229.74
O-BASF 8320 0.00 0.00 0.00

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 17.02 7.38 24.40
SAND 34.11 14.90 49.01
STONE 43.41 18.76 62.17
SIKA 204 0.00 0.00 0.00
SIKA 3006 ES 0.00 0.00 0.00
O-BASF 8320 170.15 73.80 243.95

CP-03&04
UCY BP-01 UCY BP-02 total
CEMENT 25.15 17.48 42.63
SAND 60.39 46.48 106.87
STONE 72.15 54.15 126.30
SIKA 204 254.80 0.00 254.80
SIKA 3006 ES 0.00 0.00 0.00
O-BASF 8320 61.47 171.13 232.60
SIKA LATEX POWER 0.00 0.00 0.00
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 68.5 52 120.50
CP-07 41.5 18.00 59.50
CP-0602 0 86.3 86.30

tons
tons
tons
kg
kg
kg
kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
tons O-BASF 8320
tons
tons
kg
kg
kg

tons
tons
tons
kg
kg
kg
tons
tons
tons
kg
kg
kg
kg
UCY BP 26/04/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
26/4/2021 UCY BP-01 294458 CEMENT 0.35 33003-C3S1-ARC
26/4/2021 UCY BP-01 294459 SAND 0.87 33003-C3S1-ARC
26/4/2021 UCY BP-01 294460 STONE 1.09 33003-C3S1-ARC
26/4/2021 UCY BP-01 294461 SIKA 204 4.9 33003-C3S1-ARC
26/4/2021 UCY BP-01 294462 CEMENT 1.23 20103-TRAFFICM
26/4/2021 UCY BP-01 294463 SAND 2.63 20103-TRAFFICM
26/4/2021 UCY BP-01 294464 STONE 3.15 20103-TRAFFICM
26/4/2021 UCY BP-01 294465 O-BASF 8320 11.07 20103-TRAFFICM
26/4/2021 UCY BP-01 294466 CEMENT 1.72 28003-C3ML-SUB
26/4/2021 UCY BP-01 294467 SAND 3.67 28003-C3ML-SUB
26/4/2021 UCY BP-01 294468 STONE 4.4 28003-C3ML-SUB
26/4/2021 UCY BP-01 294469 O-BASF 8320 15.5 28003-C3ML-SUB
26/4/2021 UCY BP-01 294470 CEMENT 1.14 S4000-C3S4-SUB
26/4/2021 UCY BP-01 294471 SAND 2.69 S4000-C3S4-SUB
26/4/2021 UCY BP-01 294472 STONE 4.51 S4000-C3S4-SUB
26/4/2021 UCY BP-01 294473 O-BASF 8320 9.1 S4000-C3S4-SUB
26/4/2021 UCY BP-02 294474 CEMENT 5.69 S4000-C3S3-SUB
26/4/2021 UCY BP-02 294475 SAND 11.69 S4000-C3S3-SUB
26/4/2021 UCY BP-02 294476 STONE 13.43 S4000-C3S3-SUB
26/4/2021 UCY BP-02 294477 O-BASF 8320 54.6 S4000-C3S3-SUB
26/4/2021 UCY BP-02 294478 CEMENT 18.71 S4000-C3S2-SUB
26/4/2021 UCY BP-02 294479 SAND 37.67 S4000-C3S2-SUB
26/4/2021 UCY BP-02 294480 STONE 45.45 S4000-C3S2-SUB
26/4/2021 UCY BP-02 294481 O-BASF 8320 184.8 S4000-C3S2-SUB
26/4/2021 UCY BP-02 294482 CEMENT 2.52 33003-C3S3-ARC
26/4/2021 UCY BP-02 294483 SAND 5.03 33003-C3S3-ARC
26/4/2021 UCY BP-02 294484 STONE 6.2 33003-C3S3-ARC
26/4/2021 UCY BP-02 294485 O-BASF 8320 25.2 33003-C3S3-ARC
26/4/2021 UCY BP-01 CEMENT 44.90 CP-07
26/4/2021 UCY BP-01 SAND 90.45 CP-07
26/4/2021 UCY BP-01 STONE 114.10 CP-07
26/4/2021 UCY BP-01 O-BASF 8320 448.95 CP-07
26/4/2021 UCY BP-02 CEMENT 1.11 CP-07
26/4/2021 UCY BP-02 SAND 2.22 CP-07
26/4/2021 UCY BP-02 STONE 2.79 CP-07
26/4/2021 UCY BP-02 O-BASF 8320 11.07 CP-07
26/4/2021 UCY BP-01 CEMENT 3.48 CP-0602
26/4/2021 UCY BP-01 SAND 7.33 CP-0602
26/4/2021 UCY BP-01 STONE 9.17 CP-0602
26/4/2021 UCY BP-01 SIKA 3006 ES 15.66 CP-0602
26/4/2021 UCY BP-02 CEMENT 28.52 CP-0602
26/4/2021 UCY BP-02 SAND 50.90 CP-0602
26/4/2021 UCY BP-02 STONE 65.35 CP-0602
26/4/2021 UCY BP-02 SIKA 3006 ES 171.12 CP-0602
RECORDER
CEMENT 109.37 tons
SAND 215.15 tons
STONE 269.64 tons
SIKA 204 4.90 kg
SIKA 3006 ES 186.78 kg
O-BASF 8320 760.29 kg
SIKA LATEX POWER 0.00 kg

UCY BP-01 UCY BP-02 total


CEMENT 52.82 56.55 109.37
SAND 107.64 107.51 215.15
STONE 136.42 133.22 269.64
SIKA 204 4.90 0.00 4.90
SIKA 3006 ES 15.66 171.12 186.78
O-BASF 8320 484.62 275.67 760.29
SIKA LATEX POWER 0.00 0.00 0.00

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 3.48 28.52 32.00
SAND 7.33 50.90 58.23
STONE 9.17 65.35 74.52
SIKA 204 0.00 0.00 0.00
SIKA 3006 ES 15.66 171.12 186.78
O-BASF 8320 0.00 0.00 0.00

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 44.90 1.11 46.01
SAND 90.45 2.22 92.67
STONE 114.10 2.79 116.89
SIKA 204 0.00 0.00 0.00
SIKA 3006 ES 0.00 0.00 0.00
O-BASF 8320 448.95 11.07 460.02

CP-03&04
UCY BP-01 UCY BP-02 total
CEMENT 4.44 26.92 31.36
SAND 9.86 54.39 64.25
STONE 13.15 65.08 78.23
SIKA 204 4.90 0.00 4.90
SIKA 3006 ES 0.00 0.00 0.00
O-BASF 8320 35.67 264.60 300.27
SIKA LATEX POWER 0.00 0.00 0.00
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 11.7 64 75.70
CP-07 109.5 2.70 112.20
CP-0602 8.7 62 70.70

tons
tons
tons
kg
kg
kg
kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
tons O-BASF 8320
tons
tons
kg
kg
kg

tons
tons
tons
kg
kg
kg
tons
tons
tons
kg
kg
kg
kg
UCY BP 27/04/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB RECORDER
27/4/2021 UCY BP-01 294486 CEMENT 0.49 S4000-C3S3-SUB
27/4/2021 UCY BP-01 294487 SAND 1.15 S4000-C3S3-SUB
27/4/2021 UCY BP-01 294488 STONE 1.94 S4000-C3S3-SUB
27/4/2021 UCY BP-01 294489 O-BASF 8320 3.9 S4000-C3S3-SUB
27/4/2021 UCY BP-01 294490 CEMENT 23.81 S4000-C3S1-SUB
27/4/2021 UCY BP-01 294491 SAND 47.91 S4000-C3S1-SUB
27/4/2021 UCY BP-01 294492 STONE 57.93 S4000-C3S1-SUB
27/4/2021 UCY BP-01 294493 O-BASF 8320 6.89 S4000-C3S1-SUB
27/4/2021 UCY BP-01 294494 SIKA 204 228.9 S4000-C3S1-SUB
27/4/2021 UCY BP-01 294495 CEMENT 0.46 28003-C3ML-SUB
27/4/2021 UCY BP-01 294496 SAND 0.84 28003-C3ML-SUB
27/4/2021 UCY BP-01 294497 STONE 1.03 28003-C3ML-SUB
27/4/2021 UCY BP-01 294498 SIKA 204 4.6 28003-C3ML-SUB
27/4/2021 UCY BP-01 294499 CEMENT 1.23 20103-TRAFFICM
27/4/2021 UCY BP-01 294500 SAND 2.64 20103-TRAFFICM
27/4/2021 UCY BP-01 294501 STONE 3.14 20103-TRAFFICM
27/4/2021 UCY BP-01 294502 SIKA 204 11.07 20103-TRAFFICM
27/4/2021 UCY BP-01 294503 CEMENT 5.46 S4000-C4S5-SUB
27/4/2021 UCY BP-01 294504 SAND 10.96 S4000-C4S5-SUB
27/4/2021 UCY BP-01 294505 STONE 13.4 S4000-C4S5-SUB
27/4/2021 UCY BP-01 294506 SIKA 204 54.6 S4000-C4S5-SUB
27/4/2021 UCY BP-02 294507 CEMENT 3.88 S4000-C3S4-SUB
27/4/2021 UCY BP-02 294508 SAND 10.03 S4000-C3S4-SUB
27/4/2021 UCY BP-02 294509 STONE 10.9 S4000-C3S4-SUB
27/4/2021 UCY BP-02 294510 SIKA 204 36.5 S4000-C3S4-SUB
27/4/2021 UCY BP-02 294511 CEMENT 0.84 33003-C3S3-ARC
27/4/2021 UCY BP-02 294512 SAND 1.68 33003-C3S3-ARC
27/4/2021 UCY BP-02 294513 STONE 2.06 33003-C3S3-ARC
27/4/2021 UCY BP-02 294514 SIKA 204 8.4 33003-C3S3-ARC
27/4/2021 UCY BP-02 294515 CEMENT 0.67 33003-C3S4-ARC
27/4/2021 UCY BP-02 294516 SAND 1.34 33003-C3S4-ARC
27/4/2021 UCY BP-02 294517 STONE 1.65 33003-C3S4-ARC
27/4/2021 UCY BP-02 294518 SIKA 204 6.72 33003-C3S4-ARC
27/4/2021 UCY BP-02 294519 CEMENT 1.23 20103-TRAFFICM
27/4/2021 UCY BP-02 294520 SAND 2.63 20103-TRAFFICM
27/4/2021 UCY BP-02 294521 STONE 3.14 20103-TRAFFICM
27/4/2021 UCY BP-02 294522 SIKA 204 11.07 20103-TRAFFICM
27/4/2021 UCY BP-02 294523 CEMENT 0.82 28001-SP-A-SUP
27/4/2021 UCY BP-02 294524 SAND 1.75 28001-SP-A-SUP
27/4/2021 UCY BP-02 294525 STONE 2.10 28001-SP-A-SUP
27/4/2021 UCY BP-02 294526 SIKA 204 7.38 28001-SP-A-SUP
27/4/2021 UCY BP-02 294527 CEMENT 1.72 28003-C3ML-SUB
27/4/2021 UCY BP-02 294528 SAND 3.68 28003-C3ML-SUB
27/4/2021 UCY BP-02 294529 STONE 4.40 28003-C3ML-SUB
27/4/2021 UCY BP-02 294530 SIKA 204 15.50 28003-C3ML-SUB
27/4/2021 UCY BP-02 294531 CEMENT 2.42 S4000-C3S2-SUB
27/4/2021 UCY BP-02 294532 SAND 9.92 S4000-C3S2-SUB
27/4/2021 UCY BP-02 294533 STONE 11.00 S4000-C3S2-SUB
27/4/2021 UCY BP-02 294534 SIKA 204 24.15 S4000-C3S2-SUB
27/4/2021 UCY BP-02 294535 CEMENT 0.93 S4000-C3S3-SUB
27/4/2021 UCY BP-02 294536 SAND 3.78 S4000-C3S3-SUB
27/4/2021 UCY BP-02 294537 STONE 4.19 S4000-C3S3-SUB
27/4/2021 UCY BP-02 294538 SIKA 204 9.20 S4000-C3S3-SUB
27/4/2021 UCY BP-02 294539 CEMENT 5.46 S4000-C4S5-SUB
27/4/2021 UCY BP-02 294540 SAND 10.96 S4000-C4S5-SUB
27/4/2021 UCY BP-02 294541 STONE 13.40 S4000-C4S5-SUB
27/4/2021 UCY BP-02 294542 SIKA 204 54.60 S4000-C4S5-SUB
27/4/2021 UCY BP-01 CEMENT 28.91 CP-07
27/4/2021 UCY BP-01 SAND 58.23 CP-07
27/4/2021 UCY BP-01 STONE 73.46 CP-07
27/4/2021 UCY BP-01 SIKA 204 317.96 CP-07
27/4/2021 UCY BP-02 CEMENT 9.43 CP-07
27/4/2021 UCY BP-02 SAND 18.10 CP-07
27/4/2021 UCY BP-02 STONE 23.97 CP-07
27/4/2021 UCY BP-02 SIKA 204 103.73 CP-07
27/4/2021 UCY BP-02 CEMENT 2.20 CP-0602
27/4/2021 UCY BP-02 SAND 4.15 CP-0602
27/4/2021 UCY BP-02 STONE 5.81 CP-0602
27/4/2021 UCY BP-02 SIKA 204 9.90 CP-0602
CEMENT 89.96 tons -
SAND 189.75 tons CP-03&04
STONE 233.52 tons CP-07
SIKA 204 904.28 kg CP-0602
SIKA 3006 ES 0.00 kg
O-BASF 8320 10.79 kg
SIKA LATEX POWER 0.00 kg

UCY BP-01 UCY BP-02 total


CEMENT 60.36 29.60 89.96 tons
SAND 121.73 68.02 189.75 tons
STONE 150.90 82.62 233.52 tons
SIKA 204 617.13 287.15 904.28 kg
SIKA 3006 ES 0.00 0.00 0.00 kg
O-BASF 8320 10.79 0.00 10.79 kg
SIKA LATEX POWER 0.00 0.00 0.00 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 0.00 2.20 2.20 tons
SAND 0.00 4.15 4.15 tons
STONE 0.00 5.81 5.81 tons
SIKA 204 0.00 9.90 9.90 kg
SIKA 3006 ES 0.00 0.00 0.00 kg
O-BASF 8320 0.00 0.00 0.00 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 28.91 9.43 38.34 tons
SAND 58.23 18.10 76.33 tons
STONE 73.46 23.97 97.43 tons
SIKA 204 317.96 103.73 421.69 kg
SIKA 3006 ES 0.00 0.00 0.00 kg
O-BASF 8320 0.00 0.00 0.00 kg

CP-03&04
UCY BP-01 UCY BP-02 total
CEMENT 31.45 17.97 49.42 tons
SAND 63.50 45.77 109.27 tons
STONE 77.44 52.84 130.28 tons
SIKA 204 299.17 173.52 472.69 kg
SIKA 3006 ES 0.00 0.00 0.00 kg
O-BASF 8320 10.79 0.00 10.79 kg
SIKA LATEX POWER 0.00 0.00 0.00 kg
QUANTITY
UCY BP-01 UCY BP-02 total
75.1 51.3 126.44
70.5 23.00 93.50
5.5 5.50

SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 28/04/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
28/4/2021 UCY BP-01 294543 CEMENT 7.08 S4000-C3S1-SUB
28/4/2021 UCY BP-01 294544 SAND 14.43 S4000-C3S1-SUB
28/4/2021 UCY BP-01 294545 STONE 16.83 S4000-C3S1-SUB
28/4/2021 UCY BP-01 294546 O-BASF 8320 46.2 S4000-C3S1-SUB
28/4/2021 UCY BP-01 294547 SIKA 204 22.26 S4000-C3S1-SUB
28/4/2021 UCY BP-01 294548 CEMENT 0.58 S4000-C3S3-SUB
28/4/2021 UCY BP-01 294549 SAND 2.37 S4000-C3S3-SUB
28/4/2021 UCY BP-01 294550 STONE 2.63 S4000-C3S3-SUB
28/4/2021 UCY BP-01 294551 O-BASF 8320 5.75 S4000-C3S3-SUB
28/4/2021 UCY BP-01 294552 CEMENT 1.52 S4000-C3S4-SUB
28/4/2021 UCY BP-01 294553 SAND 6.24 S4000-C3S4-SUB
28/4/2021 UCY BP-01 294554 STONE 6.93 S4000-C3S4-SUB
28/4/2021 UCY BP-01 294555 O-BASF 8320 11.5 S4000-C3S4-SUB
28/4/2021 UCY BP-01 294556 SIKA 204 3.68 S4000-C3S4-SUB
28/4/2021 UCY BP-02 294557 CEMENT 8.7 S4000-C3S3-SUB
28/4/2021 UCY BP-02 294558 SAND 17.95 S4000-C3S3-SUB
28/4/2021 UCY BP-02 294559 STONE 21.51 S4000-C3S3-SUB
28/4/2021 UCY BP-02 294560 SIKA 204 83.7 S4000-C3S3-SUB
28/4/2021 UCY BP-02 294561 CEMENT 1.7 S4000-C3S4-SUB
28/4/2021 UCY BP-02 294562 SAND 3.75 S4000-C3S4-SUB
28/4/2021 UCY BP-02 294563 STONE 3.61 S4000-C3S4-SUB
28/4/2021 UCY BP-02 294564 SIKA 204 14.7 S4000-C3S4-SUB
28/4/2021 UCY BP-02 294565 CEMENT 1.26 S4000-C3S2-SUB
28/4/2021 UCY BP-02 294566 SAND 2.53 S4000-C3S2-SUB
28/4/2021 UCY BP-02 294567 STONE 3.09 S4000-C3S2-SUB
28/4/2021 UCY BP-02 294568 SIKA 204 12.6 S4000-C3S2-SUB
28/4/2021 UCY BP-02 294569 CEMENT 1.72 28003-C3ML-SUB
28/4/2021 UCY BP-02 294570 SAND 3.69 28003-C3ML-SUB
28/4/2021 UCY BP-02 294571 STONE 4.41 28003-C3ML-SUB
28/4/2021 UCY BP-02 294572 SIKA 204 15.50 28003-C3ML-SUB
28/4/2021 UCY BP-02 294573 CEMENT 0.57 28001-SP-A-SUP
28/4/2021 UCY BP-02 294574 SAND 1.23 28001-SP-A-SUP
28/4/2021 UCY BP-02 294575 STONE 1.47 28001-SP-A-SUP
28/4/2021 UCY BP-02 294576 SIKA 204 5.17 28001-SP-A-SUP
28/4/2021 UCY BP-02 294577 CEMENT 1.23 20103-TRAFFICM
28/4/2021 UCY BP-02 294578 SAND 2.63 20103-TRAFFICM
28/4/2021 UCY BP-02 294579 STONE 3.15 20103-TRAFFICM
28/4/2021 UCY BP-02 294580 SIKA 204 11.07 20103-TRAFFICM
28/4/2021 UCY BP-01 CEMENT 7.50 CP-07
28/4/2021 UCY BP-01 SAND 15.06 CP-07
28/4/2021 UCY BP-01 STONE 19.07 CP-07
28/4/2021 UCY BP-01 SIKA 204 82.53 CP-07
28/4/2021 UCY BP-02 CEMENT 4.92 CP-07
28/4/2021 UCY BP-02 SAND 9.88 CP-07
28/4/2021 UCY BP-02 STONE 12.50 CP-07
28/4/2021 UCY BP-02 SIKA 204 54.12 CP-07
28/4/2021 UCY BP-02 CEMENT 2.20 CP-0602
28/4/2021 UCY BP-02 SAND 4.65 CP-0602
28/4/2021 UCY BP-02 STONE 5.81 CP-0602
28/4/2021 UCY BP-02 SIKA 3006 ES 9.90 CP-0602
RECORDER
CEMENT 38.98 tons
SAND 84.41 tons
STONE 101.01 tons
SIKA 204 305.33 kg
SIKA 3006 ES 9.90 kg
O-BASF 8320 63.45 kg
SIKA LATEX POWER 0.00 kg

UCY BP-01 UCY BP-02


CEMENT 16.68 22.30 total
SAND 38.10 46.31 38.98
STONE 45.46 55.55 84.41
SIKA 204 108.47 196.86 101.01
SIKA 3006 ES 0.00 9.90 305.33
O-BASF 8320 63.45 0.00 9.90
SIKA LATEX POWER 0.00 0.00 63.45
0.00
CP-0602

UCY BP-01 UCY BP-02


CEMENT 0.00 2.20 total
SAND 0.00 4.65 2.20
STONE 0.00 5.81 4.65
SIKA 204 0.00 0.00 5.81
SIKA 3006 ES 0.00 9.90 0.00
O-BASF 8320 0.00 0.00 9.90
0.00

CP-07

UCY BP-01 UCY BP-02


CEMENT 7.50 4.92 total
SAND 15.06 9.88 12.42
STONE 19.07 12.50 24.94
SIKA 204 82.53 54.12 31.57
SIKA 3006 ES 0.00 0.00 136.65
O-BASF 8320 0.00 0.00 0.00
0.00

CP-03&04
UCY BP-01 UCY BP-02
CEMENT 9.18 15.18 total
SAND 23.04 31.78 24.36
STONE 26.39 37.24 54.82
SIKA 204 25.94 142.74 63.63
SIKA 3006 ES 0.00 0.00 168.68
O-BASF 8320 63.45 0.00 0.00
SIKA LATEX POWER 0.00 0.00 63.45
0.00
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 25.9 36.6 62.50
CP-07 18.3 12.00 30.30
CP-0602 0 5.5 5.50

tons
tons
tons
kg
kg
kg
kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
tons O-BASF 8320
tons
tons
kg
kg
kg

tons
tons
tons
kg
kg
kg
tons
tons
tons
kg
kg
kg
kg
UCY BP 29/04/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
29/4/2021 UCY BP-01 294601 CEMENT 3.75 S4000-C3S1-SUB
29/4/2021 UCY BP-01 294602 SAND 8.88 S4000-C3S1-SUB
29/4/2021 UCY BP-01 294603 STONE 13.57 S4000-C3S1-SUB
29/4/2021 UCY BP-01 294604 SIKA 204 37.5 S4000-C3S1-SUB
29/4/2021 UCY BP-01 294605 CEMENT 2.33 S4000-C3S2-SUB
29/4/2021 UCY BP-01 294606 SAND 4.88 S4000-C3S2-SUB
29/4/2021 UCY BP-01 294607 STONE 6.71 S4000-C3S2-SUB
29/4/2021 UCY BP-01 294608 SIKA 204 22 S4000-C3S2-SUB
29/4/2021 UCY BP-01 294609 CEMENT 1.15 S4000-C3S4-SUB
29/4/2021 UCY BP-01 294610 SAND 4.73 S4000-C3S4-SUB
29/4/2021 UCY BP-01 294611 STONE 5.25 S4000-C3S4-SUB
29/4/2021 UCY BP-01 294612 SIKA 204 11.5 S4000-C3S4-SUB
29/4/2021 UCY BP-01 294613 CEMENT 2.46 20103-TRAFFICM
29/4/2021 UCY BP-01 294614 SAND 5.26 20103-TRAFFICM
29/4/2021 UCY BP-01 294615 STONE 6.3 20103-TRAFFICM
29/4/2021 UCY BP-01 294616 O-BASF 8320 11.07 20103-TRAFFICM
29/4/2021 UCY BP-01 294617 SIKA 204 11.07 20103-TRAFFICM
29/4/2021 UCY BP-01 294618 CEMENT 1.72 28003-C3ML-SUB
29/4/2021 UCY BP-01 294619 SAND 3.68 28003-C3ML-SUB
29/4/2021 UCY BP-01 294620 STONE 4.41 28003-C3ML-SUB
29/4/2021 UCY BP-01 294621 SIKA 204 15.5 28003-C3ML-SUB
29/4/2021 UCY BP-01 294622 CEMENT 0.82 28001-SP-A-SUP
29/4/2021 UCY BP-01 294623 SAND 1.76 28001-SP-A-SUP
29/4/2021 UCY BP-01 294624 STONE 2.09 28001-SP-A-SUP
29/4/2021 UCY BP-01 294625 SIKA 204 7.38 28001-SP-A-SUP
29/4/2021 UCY BP-01 CEMENT 3.69 CP-07
29/4/2021 UCY BP-01 SAND 7.41 CP-07
29/4/2021 UCY BP-01 STONE 9.39 CP-07
29/4/2021 UCY BP-01 SIKA 204 40.59 CP-07
29/4/2021 UCY BP-01 CEMENT 2.46 CP-07
29/4/2021 UCY BP-01 SAND 4.94 CP-07
29/4/2021 UCY BP-01 STONE 6.26 CP-07
29/4/2021 UCY BP-01 O-BASF 8320 24.60 CP-07
29/4/2021 UCY BP-02 CEMENT 4.92 CP-07
29/4/2021 UCY BP-02 SAND 9.88 CP-07
29/4/2021 UCY BP-02 STONE 12.52 CP-07
29/4/2021 UCY BP-02 O-BASF 8320 49.20 CP-07
29/4/2021 UCY BP-01 CEMENT 2.96 CP-0602
29/4/2021 UCY BP-01 SAND 6.23 CP-0602
29/4/2021 UCY BP-01 STONE 7.01 CP-0602
29/4/2021 UCY BP-01 SIKA 3006 ES 13.32 CP-0602
RECORDER
CEMENT 26.26 tons -
SAND 57.65 tons CP-03&04
STONE 73.51 tons CP-07
SIKA 204 145.54 kg CP-0602
SIKA 3006 ES 13.32 kg
O-BASF 8320 84.87 kg
SIKA LATEX POWER 0.00 kg

UCY BP-01 UCY BP-02 total


CEMENT 21.34 4.92 26.26 tons
SAND 47.77 9.88 57.65 tons
STONE 60.99 12.52 73.51 tons
SIKA 204 145.54 0.00 145.54 kg
SIKA 3006 ES 13.32 0.00 13.32 kg
O-BASF 8320 35.67 49.20 84.87 kg
SIKA LATEX POWER 0.00 0.00 0.00 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 2.96 0.00 2.96 tons
SAND 6.23 0.00 6.23 tons
STONE 7.01 0.00 7.01 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 13.32 0.00 13.32 kg
O-BASF 8320 0.00 0.00 0.00 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 6.15 4.92 11.07 tons
SAND 12.35 9.88 22.23 tons
STONE 15.65 12.52 28.17 tons
SIKA 204 40.59 0.00 40.59 kg
SIKA 3006 ES 0.00 0.00 0.00 kg
O-BASF 8320 24.60 49.20 73.80 kg

CP-03&04
UCY BP-01 UCY BP-02 total
CEMENT 12.23 0.00 12.23 tons
SAND 29.19 0.00 29.19 tons
STONE 38.33 0.00 38.33 tons
SIKA 204 104.95 0.00 104.95 kg
SIKA 3006 ES 0.00 0.00 0.00 kg
O-BASF 8320 11.07 0.00 11.07 kg
SIKA LATEX POWER 0.00 0.00 0.00 kg
QUANTITY
UCY BP-01 UCY BP-02 total
36.2 0 36.20
15 12.00 27.00
7.4 7.40

SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 30/04/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
30/4/2021 UCY BP-02 294531 CEMENT 0.21 S4000-C3ML-SUB
30/4/2021 UCY BP-02 294532 SAND 0.42 S4000-C3ML-SUB
30/4/2021 UCY BP-02 294533 STONE 0.52 S4000-C3ML-SUB
30/4/2021 UCY BP-02 294534 O-BASF 8320 2.1 S4000-C3ML-SUB
30/4/2021 UCY BP-02 CEMENT 14.35 CP-07
30/4/2021 UCY BP-02 SAND 28.81 CP-07
30/4/2021 UCY BP-02 STONE 36.47 CP-07
30/4/2021 UCY BP-02 O-BASF 8320 143.5 CP-07
30/4/2021 UCY BP-02 CEMENT 21.94 CP-07
30/4/2021 UCY BP-02 SAND 44.03 CP-07
30/4/2021 UCY BP-02 STONE 55.75 CP-07
30/4/2021 UCY BP-02 SIKA 204 241.29 CP-07
RECORDER
CEMENT 36.50 tons
SAND 73.26 tons
STONE 92.74 tons
SIKA 204 241.29 kg
SIKA 3006 ES 0.00 kg
O-BASF 8320 145.60 kg
SIKA LATEX POWER 0.00 kg

UCY BP-01 UCY BP-02 total


CEMENT 0.00 36.50 36.50
SAND 0.00 73.26 73.26
STONE 0.00 92.74 92.74
SIKA 204 0.00 241.29 241.29
SIKA 3006 ES 0.00 0.00 0.00
O-BASF 8320 0.00 145.60 145.60
SIKA LATEX POWER 0.00 0.00 0.00

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 0.00 0.00 0.00
SAND 0.00 0.00 0.00
STONE 0.00 0.00 0.00
SIKA 204 0.00 0.00 0.00
SIKA 3006 ES 0.00 0.00 0.00
O-BASF 8320 0.00 0.00 0.00

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 0.00 36.29 36.29
SAND 0.00 72.84 72.84
STONE 0.00 92.22 92.22
SIKA 204 0.00 241.29 241.29
SIKA 3006 ES 0.00 0.00 0.00
O-BASF 8320 0.00 143.50 143.50

CP-03&04
UCY BP-01 UCY BP-02 total
CEMENT 0.00 0.21 0.21
SAND 0.00 0.42 0.42
STONE 0.00 0.52 0.52
SIKA 204 0.00 0.00 0.00
SIKA 3006 ES 0.00 0.00 0.00
O-BASF 8320 0.00 2.10 2.10
SIKA LATEX POWER 0.00 0.00 0.00
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 0.0 0.5 0.50
CP-07 0 88.50 88.50
CP-0602 0 0 0.00

tons
tons
tons
kg
kg
kg
kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
tons O-BASF 8320
tons
tons
kg
kg
kg

tons
tons
tons
kg
kg
kg
tons
tons
tons
kg
kg
kg
kg
UCY BP 01/05/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
1/5/2021 UCY BP-02 294585 CEMENT 5.87 S4000-C3S2-SUB
1/5/2021 UCY BP-02 294586 SAND 13.84 S4000-C3S2-SUB
1/5/2021 UCY BP-02 294587 STONE 15.53 S4000-C3S2-SUB
1/5/2021 UCY BP-02 294588 SIKA 204 56.35 S4000-C3S2-SUB
1/5/2021 UCY BP-02 294589 CEMENT 5.27 S4000-C3S1-SUB
1/5/2021 UCY BP-02 294590 SAND 10.86 S4000-C3S1-SUB
1/5/2021 UCY BP-02 294591 STONE 12.37 S4000-C3S1-SUB
1/5/2021 UCY BP-02 294592 SIKA 204 50.4 S4000-C3S1-SUB
1/5/2021 UCY BP-02 294593 CEMENT 2.95 S4000-C3S4-SUB
1/5/2021 UCY BP-02 294594 SAND 6.24 S4000-C3S4-SUB
1/5/2021 UCY BP-02 294595 STONE 6.7 S4000-C3S4-SUB
1/5/2021 UCY BP-02 294596 SIKA 204 27.3 S4000-C3S4-SUB
1/5/2021 UCY BP-02 294597 CEMENT 1.61 28006-C3ML-SUB
1/5/2021 UCY BP-02 294598 SAND 2.92 28006-C3ML-SUB
1/5/2021 UCY BP-02 294599 STONE 3.61 28006-C3ML-SUB
1/5/2021 UCY BP-02 294600 SIKA 204 16.1 28006-C3ML-SUB
1/5/2021 UCY BP-02 294626 CEMENT 2.76 S4000-C3S3-SUB
1/5/2021 UCY BP-02 294627 SAND 11.33 S4000-C3S3-SUB
1/5/2021 UCY BP-02 294628 STONE 12.56 S4000-C3S3-SUB
1/5/2021 UCY BP-02 294629 SIKA 204 27.6 S4000-C3S3-SUB
1/5/2021 UCY BP-02 294630 CEMENT 1.93 S4000-C4S7-SUB
1/5/2021 UCY BP-02 294631 SAND 4.79 S4000-C4S7-SUB
1/5/2021 UCY BP-02 294632 STONE 5.99 S4000-C4S7-SUB
1/5/2021 UCY BP-02 294633 SIKA 204 26.95 S4000-C4S7-SUB
RECORDER
CEMENT 20.39 tons
SAND 49.98 tons
STONE 56.76 tons
SIKA 204 204.70 kg
SIKA 3006 ES 0.00 kg
O-BASF 8320 0.00 kg
SIKA LATEX POWER 0.00 kg

UCY BP-01 UCY BP-02 total


CEMENT 0.00 20.39 20.39
SAND 0.00 49.98 49.98
STONE 0.00 56.76 56.76
SIKA 204 0.00 204.70 204.70
SIKA 3006 ES 0.00 0.00 0.00
O-BASF 8320 0.00 0.00 0.00
SIKA LATEX POWER 0.00 0.00 0.00

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 0.00 0.00 0.00
SAND 0.00 0.00 0.00
STONE 0.00 0.00 0.00
SIKA 204 0.00 0.00 0.00
SIKA 3006 ES 0.00 0.00 0.00
O-BASF 8320 0.00 0.00 0.00

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 0.00 0.00 0.00
SAND 0.00 0.00 0.00
STONE 0.00 0.00 0.00
SIKA 204 0.00 0.00 0.00
SIKA 3006 ES 0.00 0.00 0.00
O-BASF 8320 0.00 0.00 0.00

CP-03&04
UCY BP-01 UCY BP-02 total
CEMENT 0.00 20.39 20.39
SAND 0.00 49.98 49.98
STONE 0.00 56.76 56.76
SIKA 204 0.00 204.70 204.70
SIKA 3006 ES 0.00 0.00 0.00
O-BASF 8320 0.00 0.00 0.00
SIKA LATEX POWER 0.00 0.00 0.00
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 0.0 0 0.00
CP-07 0 0.00 0.00
CP-0602 0 0 0.00

tons
tons
tons
kg
kg
kg
kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
tons O-BASF 8320
tons
tons
kg
kg
kg

tons
tons
tons
kg
kg
kg
tons
tons
tons
kg
kg
kg
kg
UCY BP 02/05/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
2/5/2021 UCY BP-02 294634 CEMENT 9.89 S4000-C3S3-SUB
2/5/2021 UCY BP-02 294635 SAND 20.1 S4000-C3S3-SUB
2/5/2021 UCY BP-02 294636 STONE 23.74 S4000-C3S3-SUB
2/5/2021 UCY BP-02 294637 SIKA 204 96.6 S4000-C3S3-SUB
2/5/2021 UCY BP-02 294638 CEMENT 10.72 S4000-C3S2-SUB
2/5/2021 UCY BP-02 294639 SAND 21.77 S4000-C3S2-SUB
2/5/2021 UCY BP-02 294640 STONE 25.8 S4000-C3S2-SUB
2/5/2021 UCY BP-02 294641 SIKA 204 105 S4000-C3S2-SUB
2/5/2021 UCY BP-02 294642 CEMENT 1.23 20103-TRAFFICM
2/5/2021 UCY BP-02 294643 SAND 2.63 20103-TRAFFICM
2/5/2021 UCY BP-02 294644 STONE 3.14 20103-TRAFFICM
2/5/2021 UCY BP-02 294645 SIKA 204 11.07 20103-TRAFFICM
2/5/2021 UCY BP-02 294646 CEMENT 0.82 28001-SP-A-SUP
2/5/2021 UCY BP-02 294647 SAND 1.75 28001-SP-A-SUP
2/5/2021 UCY BP-02 294648 STONE 2.1 28001-SP-A-SUP
2/5/2021 UCY BP-02 294649 SIKA 204 7.38 28001-SP-A-SUP
2/5/2021 UCY BP-02 294650 CEMENT 1.05 S4000-C4S6-SUB
2/5/2021 UCY BP-02 294651 SAND 2.1 S4000-C4S6-SUB
2/5/2021 UCY BP-02 294652 STONE 2.58 S4000-C4S6-SUB
2/5/2021 UCY BP-02 294653 SIKA 204 10.5 S4000-C4S6-SUB
2/5/2021 UCY BP-02 294654 CEMENT 0.42 S4000-C3S1-SUB
2/5/2021 UCY BP-02 294655 SAND 0.84 S4000-C3S1-SUB
2/5/2021 UCY BP-02 294656 STONE 1.03 S4000-C3S1-SUB
2/5/2021 UCY BP-02 294657 SIKA 204 4.2 S4000-C3S1-SUB
2/5/2021 UCY BP-02 CEMENT 2.46 CP-07
2/5/2021 UCY BP-02 SAND 4.93 CP-07
2/5/2021 UCY BP-02 STONE 6.21 CP-07
2/5/2021 UCY BP-02 SIKA 204 27.06 CP-07
2/5/2021 UCY BP-02 CEMENT 27.81 CP-0602
2/5/2021 UCY BP-02 SAND 50.74 CP-0602
2/5/2021 UCY BP-02 STONE 64.32 CP-0602
2/5/2021 UCY BP-02 SIKA 3006 ES 163.44 CP-0602
RECORDER
CEMENT 54.40 tons
SAND 104.86 tons
STONE 128.92 tons
SIKA 204 261.81 kg
SIKA 3006 ES 163.44 kg
O-BASF 8320 0.00 kg
SIKA LATEX POWER 0.00 kg

UCY BP-01 UCY BP-02 total


CEMENT 0.00 54.40 54.40
SAND 0.00 104.86 104.86
STONE 0.00 128.92 128.92
SIKA 204 0.00 261.81 261.81
SIKA 3006 ES 0.00 163.44 163.44
O-BASF 8320 0.00 0.00 0.00
SIKA LATEX POWER 0.00 0.00 0.00

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 0.00 27.81 27.81
SAND 0.00 50.74 50.74
STONE 0.00 64.32 64.32
SIKA 204 0.00 0.00 0.00
SIKA 3006 ES 0.00 163.44 163.44
O-BASF 8320 0.00 0.00 0.00

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 0.00 2.46 2.46
SAND 0.00 4.93 4.93
STONE 0.00 6.21 6.21
SIKA 204 0.00 27.06 27.06
SIKA 3006 ES 0.00 0.00 0.00
O-BASF 8320 0.00 0.00 0.00

CP-03&04
UCY BP-01 UCY BP-02 total
CEMENT 0.00 24.13 24.13
SAND 0.00 49.19 49.19
STONE 0.00 58.39 58.39
SIKA 204 0.00 234.75 234.75
SIKA 3006 ES 0.00 0.00 0.00
O-BASF 8320 0.00 0.00 0.00
SIKA LATEX POWER 0.00 0.00 0.00
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 0.0 57.5 57.50
CP-07 0 6.00 6.00
CP-0602 0 61.2 61.20

tons
tons
tons
kg
kg
kg
kg
SIKA 204
SIKA 3006 ES
CP-0602
CP-07
tons O-BASF 8320
tons
tons
kg
kg
kg

tons
tons
tons
kg
kg
kg
tons
tons
tons
kg
kg
kg
kg
UCY BP 03/05/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
3/5/2021 UCY BP-02 294658 CEMENT 1.23 20103-TRAFFICM
3/5/2021 UCY BP-02 294659 SAND 2.63 20103-TRAFFICM
3/5/2021 UCY BP-02 294660 STONE 3.15 20103-TRAFFICM
3/5/2021 UCY BP-02 294661 SIKA 204 11.07 20103-TRAFFICM
3/5/2021 UCY BP-02 294662 CEMENT 1.64 28003-C3ML-SUB
3/5/2021 UCY BP-02 294663 SAND 3.5 28003-C3ML-SUB
3/5/2021 UCY BP-02 294664 STONE 4.19 28003-C3ML-SUB
3/5/2021 UCY BP-02 294665 SIKA 204 14.76 28003-C3ML-SUB
3/5/2021 UCY BP-02 294666 CEMENT 2.07 S4000-C3S3-SUB
3/5/2021 UCY BP-02 294667 SAND 8.5 S4000-C3S3-SUB
3/5/2021 UCY BP-02 294668 STONE 9.44 S4000-C3S3-SUB
3/5/2021 UCY BP-02 294669 SIKA 204 20.7 S4000-C3S3-SUB
3/5/2021 UCY BP-02 294670 CEMENT 0.92 S4000-C3S1-SUB
3/5/2021 UCY BP-02 294671 SAND 3.77 S4000-C3S1-SUB
3/5/2021 UCY BP-02 294672 STONE 4.2 S4000-C3S1-SUB
3/5/2021 UCY BP-02 294673 SIKA 204 9.2 S4000-C3S1-SUB
3/5/2021 UCY BP-02 294674 CEMENT 0.42 S4000-C3S2-SUB
3/5/2021 UCY BP-02 294675 SAND 0.85 S4000-C3S2-SUB
3/5/2021 UCY BP-02 294676 STONE 1.04 S4000-C3S2-SUB
3/5/2021 UCY BP-02 294677 SIKA 204 4.2 S4000-C3S2-SUB
3/5/2021 UCY BP-02 294678 CEMENT 1.28 S4000-C3S4-SUB
3/5/2021 UCY BP-02 294679 SAND 2.91 S4000-C3S4-SUB
3/5/2021 UCY BP-02 294680 STONE 2.58 S4000-C3S4-SUB
3/5/2021 UCY BP-02 294681 SIKA 204 10.5 S4000-C3S4-SUB
3/5/2021 UCY BP-02 CEMENT 28.66 CP-07
3/5/2021 UCY BP-02 SAND 57.8 CP-07
3/5/2021 UCY BP-02 STONE 72.64 CP-07
3/5/2021 UCY BP-02 SIKA 204 289.21 CP-07
3/5/2021 UCY BP-02 CEMENT 36.25 CP-0602
3/5/2021 UCY BP-02 SAND 66.06 CP-0602
3/5/2021 UCY BP-02 STONE 84.00 CP-0602
3/5/2021 UCY BP-02 SIKA 3006 ES 212.46 CP-0602
RECORDER
CEMENT 72.47 tons
SAND 146.02 tons
STONE 181.24 tons
SIKA 204 359.64 kg
SIKA 3006 ES 212.46 kg
O-BASF 8320 0.00 kg
SIKA LATEX POWER 0.00 kg

UCY BP-01 UCY BP-02 total


CEMENT 0.00 72.47 72.47
SAND 0.00 146.02 146.02
STONE 0.00 181.24 181.24
SIKA 204 0.00 359.64 359.64
SIKA 3006 ES 0.00 212.46 212.46
O-BASF 8320 0.00 0.00 0.00
SIKA LATEX POWER 0.00 0.00 0.00

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 0.00 36.25 36.25
SAND 0.00 66.06 66.06
STONE 0.00 84.00 84.00
SIKA 204 0.00 0.00 0.00
SIKA 3006 ES 0.00 212.46 212.46
O-BASF 8320 0.00 0.00 0.00

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 0.00 28.66 28.66
SAND 0.00 57.80 57.80
STONE 0.00 72.64 72.64
SIKA 204 0.00 289.21 289.21
SIKA 3006 ES 0.00 0.00 0.00
O-BASF 8320 0.00 0.00 0.00

CP-03&04
UCY BP-01 UCY BP-02 total
CEMENT 0.00 7.56 7.56
SAND 0.00 22.16 22.16
STONE 0.00 24.60 24.60
SIKA 204 0.00 70.43 70.43
SIKA 3006 ES 0.00 0.00 0.00
O-BASF 8320 0.00 0.00 0.00
SIKA LATEX POWER 0.00 0.00 0.00
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 0.0 24 24.00
CP-07 0 69.90 69.90
CP-0602 0 79.9 79.90

tons
tons
tons
kg
kg
kg
kg

SIKA 204
tons SIKA 3006 ES
tons CP-0602
tons CP-07
kg O-BASF 8320
kg
kg

tons
tons
tons
kg
kg
kg
tons
tons
tons
kg
kg
kg
kg
UCY BP 04/05/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB RECORDER
4/5/2021 UCY BP-01 294683 CEMENT 0.81 S4000-C3S3-SUB
4/5/2021 UCY BP-01 294684 SAND 1.92 S4000-C3S3-SUB
4/5/2021 UCY BP-01 294685 STONE 3.22 S4000-C3S3-SUB
4/5/2021 UCY BP-01 294686 SIKA 204 6.5 S4000-C3S3-SUB
4/5/2021 UCY BP-01 294687 CEMENT 2.4 S4000-C3S1-SUB
4/5/2021 UCY BP-01 294688 SAND 9.3 S4000-C3S1-SUB
4/5/2021 UCY BP-01 294689 STONE 10.71 S4000-C3S1-SUB
4/5/2021 UCY BP-01 294690 SIKA 204 23.3 S4000-C3S1-SUB
4/5/2021 UCY BP-01 294691 CEMENT 0.86 28001-SP-A-SUP
4/5/2021 UCY BP-01 294692 SAND 1.85 28001-SP-A-SUP
4/5/2021 UCY BP-01 294693 STONE 2.2 28001-SP-A-SUP
4/5/2021 UCY BP-01 294694 SIKA 204 7.75 28001-SP-A-SUP
4/5/2021 UCY BP-02 294695 CEMENT 6.66 S4000-C3S1-SUB
4/5/2021 UCY BP-02 294696 SAND 13.69 S4000-C3S1-SUB
4/5/2021 UCY BP-02 294697 STONE 15.76 S4000-C3S1-SUB
4/5/2021 UCY BP-02 294698 SIKA 204 64.26 S4000-C3S1-SUB
4/5/2021 UCY BP-02 294699 CEMENT 1.27 S4000-C3S4-SUB
4/5/2021 UCY BP-02 294700 SAND 2.91 S4000-C3S4-SUB
4/5/2021 UCY BP-02 294701 STONE 2.58 S4000-C3S4-SUB
4/5/2021 UCY BP-02 294702 SIKA 204 10.5 S4000-C3S4-SUB
4/5/2021 UCY BP-02 294703 CEMENT 2.46 20103-TRAFFICM
4/5/2021 UCY BP-02 294704 SAND 5.3 20103-TRAFFICM
4/5/2021 UCY BP-02 294705 STONE 6.32 20103-TRAFFICM
4/5/2021 UCY BP-02 294706 SIKA 204 22.14 20103-TRAFFICM
4/5/2021 UCY BP-02 294707 CEMENT 0.41 28003-C3ML-SUB
4/5/2021 UCY BP-02 294708 SAND 0.88 28003-C3ML-SUB
4/5/2021 UCY BP-02 294709 STONE 1.05 28003-C3ML-SUB
4/5/2021 UCY BP-02 294710 SIKA 204 3.69 28003-C3ML-SUB
4/5/2021 UCY BP-02 294711 CEMENT 1.38 28006-C3ML
4/5/2021 UCY BP-02 294712 SAND 2.52 28006-C3ML
4/5/2021 UCY BP-02 294713 STONE 3.11 28006-C3ML
4/5/2021 UCY BP-02 294714 SIKA 204 13.80 28006-C3ML
4/5/2021 UCY BP-02 294715 CEMENT 0.63 33003-C3S2-ARC
4/5/2021 UCY BP-02 294716 SAND 1.26 33003-C3S2-ARC
4/5/2021 UCY BP-02 294717 STONE 1.54 33003-C3S2-ARC
4/5/2021 UCY BP-02 294718 SIKA 204 6.30 33003-C3S2-ARC
4/5/2021 UCY BP-02 294719 CEMENT 0.42 S4000-C3S2-SUB
4/5/2021 UCY BP-02 294720 SAND 0.84 S4000-C3S2-SUB
4/5/2021 UCY BP-02 294721 STONE 1.03 S4000-C3S2-SUB
4/5/2021 UCY BP-02 294722 SIKA 204 4.20 S4000-C3S2-SUB
4/5/2021 UCY BP-02 294723 CEMENT 1.05 33003-C3S4-ARC
4/5/2021 UCY BP-02 294724 SAND 2.10 33003-C3S4-ARC
4/5/2021 UCY BP-02 294725 STONE 2.57 33003-C3S4-ARC
4/5/2021 UCY BP-02 294726 SIKA 204 10.50 33003-C3S4-ARC
4/5/2021 UCY BP-01 CEMENT 36.70 CP-07
4/5/2021 UCY BP-01 SAND 74.29 CP-07
4/5/2021 UCY BP-01 STONE 93.00 CP-07
4/5/2021 UCY BP-01 SIKA 204 366.95 CP-07
4/5/2021 UCY BP-02 CEMENT 20.11 CP-0602
4/5/2021 UCY BP-02 SAND 37.05 CP-0602
4/5/2021 UCY BP-02 STONE 47.17 CP-0602
4/5/2021 UCY BP-02 SIKA 3006 ES 115.68 CP-0602
QUANTITY
CEMENT 75.16 tons - UCY BP-01
SAND 153.91 tons CP-03&04 14.6
STONE 190.26 tons CP-07 89.5
SIKA 204 539.89 kg CP-0602 0
SIKA 3006 ES 115.68 kg
O-BASF 8320 0.00 kg
SIKA LATEX POWER 0.00 kg

UCY BP-01 UCY BP-02 total


CEMENT 40.77 34.39 75.16 tons
SAND 87.36 66.55 153.91 tons
STONE 109.13 81.13 190.26 tons
SIKA 204 404.50 135.39 539.89 kg
SIKA 3006 ES 0.00 115.68 115.68 kg
O-BASF 8320 0.00 0.00 0.00 kg
SIKA LATEX POWER 0.00 0.00 0.00 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 0.00 20.11 20.11 tons
SAND 0.00 37.05 37.05 tons
STONE 0.00 47.17 47.17 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 0.00 115.68 115.68 kg
O-BASF 8320 0.00 0.00 0.00 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 36.70 0.00 36.70 tons
SAND 74.29 0.00 74.29 tons
STONE 93.00 0.00 93.00 tons
SIKA 204 366.95 0.00 366.95 kg
SIKA 3006 ES 0.00 0.00 0.00 kg
O-BASF 8320 0.00 0.00 0.00 kg

CP-03&04
UCY BP-01 UCY BP-02 total
CEMENT 4.07 14.28 18.35 tons
SAND 13.07 29.50 42.57 tons
STONE 16.13 33.96 50.09 tons
SIKA 204 37.55 135.39 172.94 kg
SIKA 3006 ES 0.00 0.00 0.00 kg
O-BASF 8320 0.00 0.00 0.00 kg
SIKA LATEX POWER 0.00 0.00 0.00 kg
UCY BP-02 total
0 14.60
0.00 89.50
44.8 44.80

SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320
UCY BP 05/05/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
5/5/2021 UCY BP-01 294727 CEMENT 1.23 20103-TRAFFICM
5/5/2021 UCY BP-01 294728 SAND 2.63 20103-TRAFFICM
5/5/2021 UCY BP-01 294729 STONE 3.14 20103-TRAFFICM
5/5/2021 UCY BP-01 294730 SIKA 204 11.07 20103-TRAFFICM
5/5/2021 UCY BP-01 294731 CEMENT 1.26 31002-C4S7-ARC
5/5/2021 UCY BP-01 294732 SAND 3.02 31002-C4S7-ARC
5/5/2021 UCY BP-01 294733 STONE 3.83 31002-C4S7-ARC
5/5/2021 UCY BP-01 294734 SIKA 204 17.15 31002-C4S7-ARC
5/5/2021 UCY BP-02 294735 CEMENT 3.8 S4000-C3S3-SUB
5/5/2021 UCY BP-02 294736 SAND 7.93 S4000-C3S3-SUB
5/5/2021 UCY BP-02 294737 STONE 8.77 S4000-C3S3-SUB
5/5/2021 UCY BP-02 294738 SIKA 204 35.7 S4000-C3S3-SUB
5/5/2021 UCY BP-02 294739 CEMENT 1.23 31002-C4S7-ARC
5/5/2021 UCY BP-02 294740 SAND 3.02 31002-C4S7-ARC
5/5/2021 UCY BP-02 294741 STONE 3.83 31002-C4S7-ARC
5/5/2021 UCY BP-02 294742 SIKA 204 17.15 31002-C4S7-ARC
5/5/2021 UCY BP-02 294743 CEMENT 0.41 28003-C3ML
5/5/2021 UCY BP-02 294744 SAND 0.88 28003-C3ML
5/5/2021 UCY BP-02 294745 STONE 1.05 28003-C3ML
5/5/2021 UCY BP-02 294746 SIKA 204 3.69 28003-C3ML
5/5/2021 UCY BP-02 294747 CEMENT 0.82 28001-SP-A-SUP
5/5/2021 UCY BP-02 294748 SAND 1.77 28001-SP-A-SUP
5/5/2021 UCY BP-02 294749 STONE 2.11 28001-SP-A-SUP
5/5/2021 UCY BP-02 294750 SIKA 204 7.38 28001-SP-A-SUP
5/5/2021 UCY BP-02 294751 CEMENT 1.23 20103-TRAFFICM
5/5/2021 UCY BP-02 294752 SAND 2.65 20103-TRAFFICM
5/5/2021 UCY BP-02 294753 STONE 3.16 20103-TRAFFICM
5/5/2021 UCY BP-02 294754 SIKA 204 11.07 20103-TRAFFICM
5/5/2021 UCY BP-02 294755 CEMENT 1.13 33003-C3S1-ARC
5/5/2021 UCY BP-02 294756 SAND 2.27 33003-C3S1-ARC
5/5/2021 UCY BP-02 294757 STONE 2.79 33003-C3S1-ARC
5/5/2021 UCY BP-02 294758 SIKA 204 11.34 33003-C3S1-ARC
5/5/2021 UCY BP-02 294759 CEMENT 0.63 S4000-C3S1-SUB
5/5/2021 UCY BP-02 294760 SAND 1.26 S4000-C3S1-SUB
5/5/2021 UCY BP-02 294761 STONE 1.55 S4000-C3S1-SUB
5/5/2021 UCY BP-02 294762 SIKA 204 6.30 S4000-C3S1-SUB
5/5/2021 UCY BP-02 294763 CEMENT 3.78 S4000-C3S2-SUB
5/5/2021 UCY BP-02 294764 SAND 7.55 S4000-C3S2-SUB
5/5/2021 UCY BP-02 294765 STONE 9.28 S4000-C3S2-SUB
5/5/2021 UCY BP-02 294766 SIKA 204 37.80 S4000-C3S2-SUB
5/5/2021 UCY BP-01 CEMENT 23.58 CP-07
5/5/2021 UCY BP-01 SAND 47.67 CP-07
5/5/2021 UCY BP-01 STONE 59.63 CP-07
5/5/2021 UCY BP-01 SIKA 204 235.75 CP-07
5/5/2021 UCY BP-02 CEMENT 35.67 CP-0602
5/5/2021 UCY BP-02 SAND 65.02 CP-0602
5/5/2021 UCY BP-02 STONE 82.68 CP-0602
5/5/2021 UCY BP-02 SIKA 3006 ES 209.16 CP-0602
RECORDER
CEMENT 74.77 tons
SAND 145.67 tons
STONE 181.82 tons
SIKA 204 394.40 kg
SIKA 3006 ES 209.16 kg
O-BASF 8320 0.00 kg
SIKA LATEX POWER 0.00 kg

UCY BP-01 UCY BP-02 total


CEMENT 26.07 48.70 74.77
SAND 53.32 92.35 145.67
STONE 66.60 115.22 181.82
SIKA 204 263.97 130.43 394.40
SIKA 3006 ES 0.00 209.16 209.16
O-BASF 8320 0.00 0.00 0.00
SIKA LATEX POWER 0.00 0.00 0.00

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 0.00 35.67 35.67
SAND 0.00 65.02 65.02
STONE 0.00 82.68 82.68
SIKA 204 0.00 0.00 0.00
SIKA 3006 ES 0.00 209.16 209.16
O-BASF 8320 0.00 0.00 0.00

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 23.58 0.00 23.58
SAND 47.67 0.00 47.67
STONE 59.63 0.00 59.63
SIKA 204 235.75 0.00 235.75
SIKA 3006 ES 0.00 0.00 0.00
O-BASF 8320 0.00 0.00 0.00

CP-03&04
UCY BP-01 UCY BP-02 total
CEMENT 2.49 13.03 15.52
SAND 5.65 27.33 32.98
STONE 6.97 32.54 39.51
SIKA 204 28.22 130.43 158.65
SIKA 3006 ES 0.00 0.00 0.00
O-BASF 8320 0.00 0.00 0.00
SIKA LATEX POWER 0.00 0.00 0.00
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 6.5 0 6.50
CP-07 57.5 0.00 57.50
CP-0602 0 78.6 78.60

tons
tons
tons
kg
kg
kg
kg

SIKA 204
tons SIKA 3006 ES
tons CP-0602
tons CP-07
kg O-BASF 8320
kg
kg

tons
tons
tons
kg
kg
kg
tons
tons
tons
kg
kg
kg
kg
UCY BP 06/05/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
6/5/2021 UCY BP-01 294768 CEMENT 0.63 33003-C3S2-ARC
6/5/2021 UCY BP-01 294769 SAND 1.27 33003-C3S2-ARC
6/5/2021 UCY BP-01 294770 STONE 1.56 33003-C3S2-ARC
6/5/2021 UCY BP-01 294771 SIKA 204 6.3 33003-C3S2-ARC
6/5/2021 UCY BP-01 294772 CEMENT 13.65 S4000-C4S6-SUB
6/5/2021 UCY BP-01 294773 SAND 27.39 S4000-C4S6-SUB
6/5/2021 UCY BP-01 294774 STONE 33.7 S4000-C4S6-SUB
6/5/2021 UCY BP-01 294775 SIKA 204 136.5 S4000-C4S6-SUB
6/5/2021 UCY BP-01 294776 CEMENT 1.23 20103-TRAFFICM
6/5/2021 UCY BP-01 294777 SAND 2.64 20103-TRAFFICM
6/5/2021 UCY BP-01 294778 STONE 3.15 20103-TRAFFICM
6/5/2021 UCY BP-01 294779 SIKA 204 11.07 20103-TRAFFICM
6/5/2021 UCY BP-01 294780 CEMENT 0.41 28003-C3ML-SUB
6/5/2021 UCY BP-01 294781 SAND 0.88 28003-C3ML-SUB
6/5/2021 UCY BP-01 294782 STONE 1.05 28003-C3ML-SUB
6/5/2021 UCY BP-01 294783 SIKA 204 3.69 28003-C3ML-SUB
6/5/2021 UCY BP-01 294784 CEMENT 0.69 S4000-C3S4-SUB
6/5/2021 UCY BP-01 294785 SAND 2.84 S4000-C3S4-SUB
6/5/2021 UCY BP-01 294786 STONE 3.15 S4000-C3S4-SUB
6/5/2021 UCY BP-01 294787 SIKA 204 6.9 S4000-C3S4-SUB
6/5/2021 UCY BP-02 294788 CEMENT 0.92 28001-SP-A-SUP
6/5/2021 UCY BP-02 294789 SAND 1.67 28001-SP-A-SUP
6/5/2021 UCY BP-02 294790 STONE 2.07 28001-SP-A-SUP
6/5/2021 UCY BP-02 294791 SIKA 3006 ES 5.52 28001-SP-A-SUP
6/5/2021 UCY BP-01 CEMENT 13.53 CP-07
6/5/2021 UCY BP-01 SAND 27.42 CP-07
6/5/2021 UCY BP-01 STONE 34.19 CP-07
6/5/2021 UCY BP-01 SIKA 204 135.3 CP-07
6/5/2021 UCY BP-02 CEMENT 10.05 CP-07
6/5/2021 UCY BP-02 SAND 20.36 CP-07
6/5/2021 UCY BP-02 STONE 25.38 CP-07
6/5/2021 UCY BP-02 SIKA 204 100.45 CP-07
6/5/2021 UCY BP-02 CEMENT 28.89 CP-0602
6/5/2021 UCY BP-02 SAND 52.55 CP-0602
6/5/2021 UCY BP-02 STONE 67.04 CP-0602
6/5/2021 UCY BP-02 SIKA 204 169.68 CP-0602
RECORDER
CEMENT 70.00 tons
SAND 137.02 tons
STONE 171.29 tons
SIKA 204 569.89 kg
SIKA 3006 ES 5.52 kg
O-BASF 8320 0.00 kg
SIKA LATEX POWER 0.00 kg

UCY BP-01 UCY BP-02 total


CEMENT 30.14 39.86 70.00
SAND 62.44 74.58 137.02
STONE 76.80 94.49 171.29
SIKA 204 299.76 270.13 569.89
SIKA 3006 ES 0.00 5.52 5.52
O-BASF 8320 0.00 0.00 0.00
SIKA LATEX POWER 0.00 0.00 0.00

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 0.00 28.89 28.89
SAND 0.00 52.55 52.55
STONE 0.00 67.04 67.04
SIKA 204 0.00 169.68 169.68
SIKA 3006 ES 0.00 0.00 0.00
O-BASF 8320 0.00 0.00 0.00

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 13.53 10.05 23.58
SAND 27.42 20.36 47.78
STONE 34.19 25.38 59.57
SIKA 204 135.30 100.45 235.75
SIKA 3006 ES 0.00 0.00 0.00
O-BASF 8320 0.00 0.00 0.00

CP-03&04
UCY BP-01 UCY BP-02 total
CEMENT 16.61 0.92 17.53
SAND 35.02 1.67 36.69
STONE 42.61 2.07 44.68
SIKA 204 164.46 0.00 164.46
SIKA 3006 ES 0.00 5.52 5.52
O-BASF 8320 0.00 0.00 0.00
SIKA LATEX POWER 0.00 0.00 0.00
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 41.0 2 43.00
CP-07 33 24.50 57.50
CP-0602 0 63.6 63.60

tons
tons
tons
kg
kg
kg
kg

SIKA 204
tons SIKA 3006 ES
tons CP-0602
tons CP-07
kg O-BASF 8320
kg
kg

tons
tons
tons
kg
kg
kg
tons
tons
tons
kg
kg
kg
kg
UCY BP 07/05/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
7/5/2021 UCY BP-01 294791 CEMENT 5.21 S4000-C3S3-SUB
7/5/2021 UCY BP-01 294792 SAND 10.95 S4000-C3S3-SUB
7/5/2021 UCY BP-01 294793 STONE 12.38 S4000-C3S3-SUB
7/5/2021 UCY BP-01 294794 SIKA 204 49.8 S4000-C3S3-SUB
7/5/2021 UCY BP-01 294795 CEMENT 0.3 S4000-C3S4-SUB
7/5/2021 UCY BP-01 294796 SAND 1.23 S4000-C3S4-SUB
7/5/2021 UCY BP-01 294797 STONE 1.36 S4000-C3S4-SUB
7/5/2021 UCY BP-01 294798 SIKA 204 2.99 S4000-C3S4-SUB
7/5/2021 UCY BP-01 294799 CEMENT 0.41 28003-C3ML-SUB
7/5/2021 UCY BP-01 294800 SAND 0.88 28003-C3ML-SUB
7/5/2021 UCY BP-01 296301 STONE 1.05 28003-C3ML-SUB
7/5/2021 UCY BP-01 296302 SIKA 204 3.69 28003-C3ML-SUB
7/5/2021 UCY BP-01 296303 CEMENT 1.84 28006-C3ML-SUB
7/5/2021 UCY BP-01 296304 SAND 3.34 28006-C3ML-SUB
7/5/2021 UCY BP-01 296305 STONE 4.12 28006-C3ML-SUB
7/5/2021 UCY BP-01 296306 SIKA 204 18.4 28006-C3ML-SUB
7/5/2021 UCY BP-01 296307 CEMENT 1.68 S4000-C3S2-SUB
7/5/2021 UCY BP-01 296308 SAND 3.36 S4000-C3S2-SUB
7/5/2021 UCY BP-01 296309 STONE 4.12 S4000-C3S2-SUB
7/5/2021 UCY BP-01 296310 SIKA 204 16.8 S4000-C3S2-SUB
7/5/2021 UCY BP-02 296311 CEMENT 1.23 20103-TRAFFICM
7/5/2021 UCY BP-02 296312 SAND 2.63 20103-TRAFFICM
7/5/2021 UCY BP-02 296313 STONE 3.14 20103-TRAFFICM
7/5/2021 UCY BP-02 296314 SIKA 204 11.07 20103-TRAFFICM
7/5/2021 UCY BP-02 296315 CEMENT 3.16 S4000-C3S1-SUB
7/5/2021 UCY BP-02 296316 SAND 11.68 S4000-C3S1-SUB
7/5/2021 UCY BP-02 296317 STONE 13.06 S4000-C3S1-SUB
7/5/2021 UCY BP-02 296318 SIKA 204 31.6 S4000-C3S1-SUB
7/5/2021 UCY BP-02 296319 CEMENT 4.59 S4000-C3S3-SUB
7/5/2021 UCY BP-02 296320 SAND 9.47 S4000-C3S3-SUB
7/5/2021 UCY BP-02 296321 STONE 12.50 S4000-C3S3-SUB
7/5/2021 UCY BP-02 296322 SIKA 204 44.30 S4000-C3S3-SUB
7/5/2021 UCY BP-02 296323 CEMENT 0.42 S4000-C3S2-SUB
7/5/2021 UCY BP-02 296324 SAND 0.84 S4000-C3S2-SUB
7/5/2021 UCY BP-02 296325 STONE 1.03 S4000-C3S2-SUB
7/5/2021 UCY BP-02 296326 SIKA 204 4.20 S4000-C3S2-SUB
7/5/2021 UCY BP-01 CEMENT 18.66 CP-07
7/5/2021 UCY BP-01 SAND 37.72 CP-07
7/5/2021 UCY BP-01 STONE 47.18 CP-07
7/5/2021 UCY BP-01 SIKA 204 186.55 CP-07
7/5/2021 UCY BP-02 CEMENT 1.03 CP-07
7/5/2021 UCY BP-02 SAND 2.04 CP-07
7/5/2021 UCY BP-02 STONE 2.61 CP-07
7/5/2021 UCY BP-02 SIKA 204 10.25 CP-07
7/5/2021 UCY BP-02 CEMENT 1.68 CP-0602
7/5/2021 UCY BP-02 SAND 3.54 CP-0602
7/5/2021 UCY BP-02 STONE 4.41 CP-0602
7/5/2021 UCY BP-02 SIKA 3006 ES 7.56 CP-0602
RECORDER
CEMENT 40.21 tons
SAND 87.68 tons
STONE 106.96 tons
SIKA 204 379.65 kg
SIKA 3006 ES 7.56 kg
O-BASF 8320 0.00 kg
SIKA LATEX POWER 0.00 kg

UCY BP-01 UCY BP-02 total


CEMENT 28.10 12.11 40.21
SAND 57.48 30.20 87.68
STONE 70.21 36.75 106.96
SIKA 204 278.23 101.42 379.65
SIKA 3006 ES 0.00 7.56 7.56
O-BASF 8320 0.00 0.00 0.00
SIKA LATEX POWER 0.00 0.00 0.00

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 0.00 1.68 1.68
SAND 0.00 3.54 3.54
STONE 0.00 4.41 4.41
SIKA 204 0.00 0.00 0.00
SIKA 3006 ES 0.00 7.56 7.56
O-BASF 8320 0.00 0.00 0.00

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 18.66 1.03 19.69
SAND 37.72 2.04 39.76
STONE 47.18 2.61 49.79
SIKA 204 186.55 10.25 196.80
SIKA 3006 ES 0.00 0.00 0.00
O-BASF 8320 0.00 0.00 0.00

CP-03&04
UCY BP-01 UCY BP-02 total
CEMENT 9.44 9.40 18.84
SAND 19.76 24.62 44.38
STONE 23.03 29.73 52.76
SIKA 204 91.68 91.17 182.85
SIKA 3006 ES 0.00 0.00 0.00
O-BASF 8320 0.00 0.00 0.00
SIKA LATEX POWER 0.00 0.00 0.00
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 22.8 28 50.80
CP-07 45.5 2.50 48.00
CP-0602 0 4.2 4.20

tons
tons
tons
kg
kg
kg
kg

SIKA 204
tons SIKA 3006 ES
tons CP-0602
tons CP-07
kg O-BASF 8320
kg
kg

tons
tons
tons
kg
kg
kg
tons
tons
tons
kg
kg
kg
kg
UCY BP 08/05/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
8/5/2021 UCY BP-01 296327 CEMENT 65.52 S4000-C4S6-SUB
8/5/2021 UCY BP-01 296328 SAND 130.57 S4000-C4S6-SUB
8/5/2021 UCY BP-01 296329 STONE 160.52 S4000-C4S6-SUB
8/5/2021 UCY BP-01 296330 SIKA 204 655.2 S4000-C4S6-SUB
8/5/2021 UCY BP-02 296331 CEMENT 1.35 20103-TRAFFICM
8/5/2021 UCY BP-02 296332 SAND 2.9 20103-TRAFFICM
8/5/2021 UCY BP-02 296333 STONE 3.46 20103-TRAFFICM
8/5/2021 UCY BP-02 296334 SIKA 204 12.18 20103-TRAFFICM
8/5/2021 UCY BP-02 296335 CEMENT 1.11 28001-SP-A-SUP
8/5/2021 UCY BP-02 296336 SAND 2.37 28001-SP-A-SUP
8/5/2021 UCY BP-02 296337 STONE 2.83 28001-SP-A-SUP
8/5/2021 UCY BP-02 296338 SIKA 204 9.96 28001-SP-A-SUP
8/5/2021 UCY BP-02 296339 CEMENT 0.3 S4000-C3S4-SUB
8/5/2021 UCY BP-02 296340 SAND 1.23 S4000-C3S4-SUB
8/5/2021 UCY BP-02 296341 STONE 1.36 S4000-C3S4-SUB
8/5/2021 UCY BP-02 296342 SIKA 204 2.99 S4000-C3S4-SUB
8/5/2021 UCY BP-02 296343 CEMENT 0.84 S4000-C3S1-SUB
8/5/2021 UCY BP-02 296344 SAND 1.67 S4000-C3S1-SUB
8/5/2021 UCY BP-02 296345 STONE 2.06 S4000-C3S1-SUB
8/5/2021 UCY BP-02 296346 SIKA 204 8.4 S4000-C3S1-SUB
8/5/2021 UCY BP-02 296347 CEMENT 81.9 S4000-C4S6-SUB
8/5/2021 UCY BP-02 296348 SAND 163.22 S4000-C4S6-SUB
8/5/2021 UCY BP-02 296349 STONE 200.66 S4000-C4S6-SUB
8/5/2021 UCY BP-02 296350 SIKA 204 819 S4000-C4S6-SUB
8/5/2021 UCY BP-01 CEMENT 24.19 CP-07
8/5/2021 UCY BP-01 SAND 48.44 CP-07
8/5/2021 UCY BP-01 STONE 61.48 CP-07
8/5/2021 UCY BP-01 SIKA 204 241.9 CP-07
8/5/2021 UCY BP-02 CEMENT 12.51 CP-07
8/5/2021 UCY BP-02 SAND 25.04 CP-07
8/5/2021 UCY BP-02 STONE 31.78 CP-07
8/5/2021 UCY BP-02 SIKA 204 125.05 CP-07
RECORDER
CEMENT 187.72 tons
SAND 375.44 tons
STONE 464.15 tons
SIKA 204 1874.68 kg
SIKA 3006 ES 0.00 kg
O-BASF 8320 0.00 kg
SIKA LATEX POWER 0.00 kg

UCY BP-01 UCY BP-02 total


CEMENT 89.71 98.01 187.72
SAND 179.01 196.43 375.44
STONE 222.00 242.15 464.15
SIKA 204 897.10 977.58 1874.68
SIKA 3006 ES 0.00 0.00 0.00
O-BASF 8320 0.00 0.00 0.00
SIKA LATEX POWER 0.00 0.00 0.00

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 0.00 0.00 0.00
SAND 0.00 0.00 0.00
STONE 0.00 0.00 0.00
SIKA 204 0.00 0.00 0.00
SIKA 3006 ES 0.00 0.00 0.00
O-BASF 8320 0.00 0.00 0.00

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 24.19 12.51 36.70
SAND 48.44 25.04 73.48
STONE 61.48 31.78 93.26
SIKA 204 241.90 125.05 366.95
SIKA 3006 ES 0.00 0.00 0.00
O-BASF 8320 0.00 0.00 0.00

CP-03&04
UCY BP-01 UCY BP-02 total
CEMENT 65.52 85.50 151.02
SAND 130.57 171.39 301.96
STONE 160.52 210.37 370.89
SIKA 204 655.20 852.53 1507.73
SIKA 3006 ES 0.00 0.00 0.00
O-BASF 8320 0.00 0.00 0.00
SIKA LATEX POWER 0.00 0.00 0.00
QUANTITY
- UCY BP-01 UCY BP-02 total
CP-03&04 156.0 204.3 360.30
CP-07 59 30.50 89.50
CP-0602 156 0 156.00

tons
tons
tons
kg
kg
kg
kg

SIKA 204
tons SIKA 3006 ES
tons CP-0602
tons CP-07
kg O-BASF 8320
kg
kg

tons
tons
tons
kg
kg
kg
tons
tons
tons
kg
kg
kg
kg
UCY BP 09/05/2021
Summary RQ
DATE Plant RQ NO Material QTY SUBJOB
9/5/2021 UCY BP-01 296351 CEMENT 51.87 S4000-C4S9-SUB
9/5/2021 UCY BP-01 296352 SAND 103.25 S4000-C4S9-SUB
9/5/2021 UCY BP-01 296353 STONE 126.96 S4000-C4S9-SUB
9/5/2021 UCY BP-01 296354 SIKA 204 518.7 S4000-C4S9-SUB
9/5/2021 UCY BP-01 296355 CEMENT 55.02 S4000-C4S7-SUB
9/5/2021 UCY BP-01 296356 SAND 109.51 S4000-C4S7-SUB
9/5/2021 UCY BP-01 296357 STONE 134.67 S4000-C4S7-SUB
9/5/2021 UCY BP-01 296358 SIKA 204 550.2 S4000-C4S7-SUB
9/5/2021 UCY BP-02 296359 CEMENT 0.86 S4000-C3S3-SUB
9/5/2021 UCY BP-02 296360 SAND 2.05 S4000-C3S3-SUB
9/5/2021 UCY BP-02 296361 STONE 1.54 S4000-C3S3-SUB
9/5/2021 UCY BP-02 296362 SIKA 204 6.3 S4000-C3S3-SUB
9/5/2021 UCY BP-02 296363 CEMENT 6.93 S4000-C3S1-SUB
9/5/2021 UCY BP-02 296364 SAND 13.79 S4000-C3S1-SUB
9/5/2021 UCY BP-02 296365 STONE 16.96 S4000-C3S1-SUB
9/5/2021 UCY BP-02 296366 SIKA 204 69.3 S4000-C3S1-SUB
9/5/2021 UCY BP-02 296367 CEMENT 57.33 S4000-C4S9-SUB
9/5/2021 UCY BP-02 296368 SAND 114.11 S4000-C4S9-SUB
9/5/2021 UCY BP-02 296369 STONE 140.32 S4000-C4S9-SUB
9/5/2021 UCY BP-02 296370 SIKA 204 573.3 S4000-C4S9-SUB
9/5/2021 UCY BP-02 296371 CEMENT 54.6 S4000-C4S7-SUB
9/5/2021 UCY BP-02 296372 SAND 108.68 S4000-C4S7-SUB
9/5/2021 UCY BP-02 296373 STONE 133.64 S4000-C4S7-SUB
9/5/2021 UCY BP-02 296374 SIKA 204 546 S4000-C4S7-SUB
9/5/2021 UCY BP-01 CEMENT 13.94 CP-07
9/5/2021 UCY BP-01 SAND 27.91 CP-07
9/5/2021 UCY BP-01 STONE 35.36 CP-07
9/5/2021 UCY BP-01 SIKA 204 139.4 CP-07
9/5/2021 UCY BP-02 CEMENT 11.69 CP-07
9/5/2021 UCY BP-02 SAND 23.40 CP-07
9/5/2021 UCY BP-02 STONE 29.64 CP-07
9/5/2021 UCY BP-02 SIKA 204 116.85 CP-07
9/5/2021 UCY BP-01 CEMENT 1.92 CP-0602
9/5/2021 UCY BP-01 SAND 4.06 CP-0602
9/5/2021 UCY BP-01 STONE 5.05 CP-0602
9/5/2021 UCY BP-01 SIKA 3006 ES 8.64 CP-0602
RECORDER
CEMENT 254.16 tons -
SAND 506.76 tons CP-03&04
STONE 624.14 tons CP-07
SIKA 204 2520.05 kg CP-0602
SIKA 3006 ES 8.64 kg
O-BASF 8320 0.00 kg
SIKA LATEX POWER 0.00 kg

UCY BP-01 UCY BP-02 total


CEMENT 122.75 131.41 254.16 tons
SAND 244.73 262.03 506.76 tons
STONE 302.04 322.10 624.14 tons
SIKA 204 1208.30 1311.75 2520.05 kg
SIKA 3006 ES 8.64 0.00 8.64 kg
O-BASF 8320 0.00 0.00 0.00 kg
SIKA LATEX POWER 0.00 0.00 0.00 kg

CP-0602

UCY BP-01 UCY BP-02 total


CEMENT 1.92 0.00 1.92 tons
SAND 4.06 0.00 4.06 tons
STONE 5.05 0.00 5.05 tons
SIKA 204 0.00 0.00 0.00 kg
SIKA 3006 ES 8.64 0.00 8.64 kg
O-BASF 8320 0.00 0.00 0.00 kg

CP-07

UCY BP-01 UCY BP-02 total


CEMENT 13.94 11.69 25.63 tons
SAND 27.91 23.40 51.31 tons
STONE 35.36 29.64 65.00 tons
SIKA 204 139.40 116.85 256.25 kg
SIKA 3006 ES 0.00 0.00 0.00 kg
O-BASF 8320 0.00 0.00 0.00 kg

CP-03&04
UCY BP-01 UCY BP-02 total
CEMENT 106.89 119.72 226.61 tons
SAND 212.76 238.63 451.39 tons
STONE 261.63 292.46 554.09 tons
SIKA 204 1068.90 1194.90 2263.80 kg
SIKA 3006 ES 0.00 0.00 0.00 kg
O-BASF 8320 0.00 0.00 0.00 kg
SIKA LATEX POWER 0.00 0.00 0.00 kg
QUANTITY
UCY BP-01 UCY BP-02 total
254.5 285 539.50
34 28.50 62.50
4.8 0 4.80

SIKA 204
SIKA 3006 ES
CP-0602
CP-07
O-BASF 8320