Daily Report

Date: 31.03.2021
Shift: Night
1 Sending report in Line All report
2 Mixing Concrete
BP-03 58.00 CU.M
BP-04 13.00 CU.M
total 71.00 CU.M
CP-07 ……………………44.00 00.00 CU.M
CP-06 00.00 cu.m
3
3.1 Operator Name: Md Arif Hossain Sirazul Islam
3.2 Washing Pit……………………………….00

4 RECEIVING MATERIALS
4.1 CEMENT CP-3&4= 77.65 tons
4.2 Sand CP-3&4-122.70 tons
4.3 Stone CP-03&04-182.50 tons
4.4 Sika 204 From cp-3&4-0 kg
4.5 MP(8320) ……………..From UCY…00
5 Time start to work 22:02
Time start to finish 3:04

6 Machine Repair
6.1
6.2
7 Problem & Solution