19/09/2019 MSP CLASS TEST – 1 (Time – 1 Hour)

Student Name - _______________________________

Enrolment No - ______________________

(Assume suitable data if required)

SWIMMING POOL
UNDERGROUND WATER TANK
RCC ROAD
Q-1.
Project Start Date – 1/10/2019. List down activities (Minimum – 30) with
proper WBS and Predecessors/constraint. Give appropriate durations,
show critical activities and project summery task, do bar style for the
same. Hire three Engineers for different phase (Pre-construction Phase
– JAY, Construction Phase – VAIBHAV, Finishing Phase – RAKESH) and
give them responsibility for relevant activities, also check the billing for
the same. Show Billing, Responsibility and Phase columns.
(15 Marks)
Q-2.
Setup the Calendar as follows: (5 Marks)
A. Project Calendar (Your Enrolment No.) with 9 hours working time for
Saturday as a Half Day and Sunday as a non-working day.
B. Holidays:
1. Half day on 7th October for only 1 year.
2. 2nd October for 2 Years.
3. 2nd Wednesday of Every 1 Month for 1 year.
4. Every 15th of Month is Holiday.
5. Diwali and Holi Vacation.