Subject: ECC Application

Project : Filinvest Water Treatment Plant


INITIAL ENVIRONMENTAL EXAMINATION (IEE) CHECKLIST FORM FOR WATER SUPPLY PROJECTS
required an IEE Report / IEE Checklist for ECC Application

Item Attachments Remarks

Title of the project must be consistent to other documents submitted to the authorized agency.

1.0 Project Description

Project size parameter based on the storage capacity not in the actual supply/treatment capacity

2.0 Project Components


3.0 Environmental Impact Management Plan
Due to the relatively long operational life of the subproject,
decommissioning or closure is not envisioned in the near or medium term (e.g., 25 – 50
years). 1.Decommissioning of the facilities is a remote
possibility since this treatment plant will serve future populations and such facilities are critical for sustaining those areas,
2.residual waste cleanup is not a major concern since the facilities are not industrial manufacturing plants with potential problems for
Abandonment/Decommissioning/Rehabilitation Policies and toxic and hazardous wastes.
4.0
Generic Guidelines 3. solid wastes from decommissioning is also not a major concern since the structures are mostly made of reinforced concrete and the
solid wastes are mostly recyclable
materials such as broken concrete materials, reinforcing steel bars used in the structures, structural steel, roofing materials, electrical
wires, etc.
In case decommissioning become an option, the appropriate action plan will be
prepared in compliance with GOP regulatory requirements.
5.0 Institutional Plan for EMP Implementation
6.0 Proof of Compatibility on Existing Land Use
7.0 Proof of Authority over the Project Site
Accountability Statements of Proponent (see attached form) and
8.0 the Preparer (if any, following Annexes 2-22 of Revised
Procedural Manual for DAO 2003-30)

Photographs or plates/vicinity map of the project site showing


9.0
impact areas and affected areas and communities

Duly Accomplished Project Environmental Monitoring & Audit


10.0
Prioritization Scheme (PEMAPS) Questionnaire (see Annex 2-7d
of Revised Procedural Manual for DAO 2003-30)

(No other documents shall be required as pre-requisite to ECC applications per DENR MC 2010-14.)