Professional Documents
Culture Documents
1 GE-PADAPPAI H48404514-01
2 GE-PADAPPAI H48404517-01
3 GE-PADAPPAI H48404693-01
4 GE-PADAPPAI H48404691-01
7 GE-PADAPPAI F06P27Z405-01
8 GE-PADAPPAI F06P12Z812-01
9 GE-PADAPPAI F06P12Z812-02
10 Thoshiba K6112007
11 Thoshiba K6112063
12 Thoshiba K6112064
13 Thoshiba K6112016
1 GE-PADAPPAI H48119566
THOSIBA
1 M - 9139105-152 H10A30000170
2 M - 6299113 - 035 H11A30000006
3 M - 6299113 - 027 H13A30000009
4 M - 9139105 - 151 H10A30000167
5 M - 9139105 - 171 H10A20000296
TOOLS TO BE REWORK
Support NT11211-CRCA
Support NT11211-CRCA
LEVER
WASHER 5 MM
SPACER 1.50 MM
WASHER 1 MM
WASHER 5 MM
WASHER 6 MM
BLANKING,PIERCING,FORMING,SHAVING
WASHER TOOL
WASHER TOOL
WASHER TOOL
WASHER TOOL
WASHER TOOL
Failure by Status on 17-07-19 priority
60 Design Completed
Target date for Completion 16.08.19 1 ST PRIORITY
60 Target Date 25.07.19 1 ST PRIORITY
60 Target Date 25.07.19 1ST PRIORITY
NT1389 - 5052
8 GE Padappai F06P07Z010-01 U Shape Plate Bending tool
H32
9 GE Padappai H48137493-01 Support position indicator NT11211-CRCA Bending tool
10 GE Padappai H48138493-01 Bracket Position Indicator NT11211-CRCA Bending tool
11 GE Padappai H48404524-01 Control Cam is1079
16 GE Padappai H48119557-01 Lever 1 motor limit switch NT1233-SS304 Blank, Pier, Shav
Avl
Completed
Avl Completed
Avl Completed
Completed
AVL
Completed
AVL
Completed
Avl
Completed
Avl
Completed
Avl
Completed
Avl
Completed
Avl
Completed
Completed
Completed
Completed
ot piercing reference-holeCompleted
rimming both sides. Completed
5/25/2019
5/25/2019
5/25/2019
5/25/2019
SVPC COMMITMENT status as on 24.04.19 status as on 8.5.19
W12
W11
W11
W12
RM required requset given on 08.04.19
W11 for Gauge mat given
Tool completed RM required requset
W12 given on 08.04.19 for Gauge mat given
RM required requset given on 08.04.19
W11 for Gauge mat given
RM required requset given on 08.04.19
W11 for Gauge mat given
RM required requset given on 08.04.19
W11 for Gauge mat given
Tool completed RM required requset
W11 given on 08.04.19 for Gauge mat given
Tool completed RM required requset
W11 given on 08.04.19 for Gauge mat given
RM required requset
given on 08.04.19 for
Gauge
RM required requset
given on 08.04.19 for
Gauge
RM required requset
given on 08.04.19 for
Gauge mat given we comitted on 15-5
RM required requset
given on 08.04.19 for
Gauge mat given we comitted on 15-5
completed
completed
completed
we comitted on 15-5-19 completed
SAMPLE SUBMITTED
COMPLETED
SAMPLE SUBMITTED
COMPLETED