Professional Documents
Culture Documents
(Ref # 96718)
LOT WMF 03
(Koidu Government Hospital)
November 2015
Project Partners:
Ministry of Health and Sanitation (MoHS)
Funding source:
Department for International Development (DFID)
CONTENTS
PART C1...................................................................................................................................... 3
C1.1: Background and Brief ....................................................................................................... 3
C1.2: Employer’s Roel and Responsibility ................................................................................. 3
C1.3: Contractor’s Obligation ...................................................................................................................... 3
C1.4: The existing Facilities (to be rehabilitated) ...................................................................... 3
C1.5: Site Management and Controls ......................................................................................... 3
C1.6: Security of Contractors Personnel’s and Construction Equipment’s ............................. 4
C1.7: Cooperation with other partners ...................................................................................... 4
PART C2...................................................................................................................................... 6
C2.1: Site Information ................................................................................................................. 6
PART C3...................................................................................................................................... 7
C3.1: Scope of Work (SoW) ........................................................................................................ 7
ANNEX
Annex B.2.a – Design for New Waste Management Facility
Annex B.2.b – Detailed Bill of Quantities (only for one New Waste Management Facility –
not including the rehabilitation works)
PART C1
C1.1 Background and Brief
The project is located within: Koidu Government Hospital.
The Scope of Works covers the construction or rehabilitation of existing Waste Management
Facility (WMF) and construction of a low fuel consumption De Montfort Mark 9 Incinerator
(which refractory brick and related mortar will be provided by UNOPS).
The WMF shall serve as the unit for temporary storage of all types of waste (already segregated
from the hospital) in different boxes for further processing or disposal. The generic waste shall be
disposed off-site, including hazard waste which shall be disposed by a specialist firm. The
incinerator shall serve the function of burning the clinical and biomedical waste at a high
temperature for disposal into ash pits, including disposal of residual sharps into the sharp pits.
The placenta pits shall function for the disposal of such waste that cannot be incinerated. A water
point and floor drain will be install for the routine cleaning of this area. A concrete rectangular
drainage and apron shall be built around the perimeter of the entire facility. The whole area shall
be fence off with steel chain link fence and a gate as security measure and to ensure limited
access to the site by only authorized personnel.
The Contractor will be responsible to carry out all the needed works, in a workmanlike manner,
making sure that the structure can cope with his function in a correct way.
Scope of Works for Construction and Rehabilitation of Waste Management Facility – LOT WMF 03 Page 3 of 10
A floor slab approximately 8m x 8m, sandcrete solid dwarf walls topped by steel mesh,
timber trusses and corrugated iron roofing sheets.
A “Saubatech” Incinerator (metal)
At least 2Nr temporary waste storage boxes constructed within the structure with 100mm
thick solid sandcrete blocks dwarf wall and a timber door.
Ash pit with a reinforced concrete suspended slab and a rectangular opening (manhole)
Placenta pit with a reinforced concrete suspended slab and a rectangular opening
(manhole)
Main entrance – timber door
External perimeter wall - dwarf sandcrete block wall – 150mm thick
Steel mesh with timber (hardwood) frame in opening atop of external dwarf wall.
Temporary storage sandcrete block wall – 100mm thick
C.I sheet roofing member
Timber trusses (wall plates, purlin and rafters etc.)
Structural members – columns, ring beam and floor slab (suspended over pits)
Scope of Works for Construction and Rehabilitation of Waste Management Facility – LOT WMF 03 Page 4 of 10
Contractor and as much as possible to minimize interference with the smooth running and
operation of the hospital activities during construction and other related activities.
The Contractor shall also cooperate with Contractors, persons and workmen appointed by
UNOPS who may be employed in the execution of a project or operating at or near the site of any
Works in connection with this project.
Scope of Works for Construction and Rehabilitation of Waste Management Facility – LOT WMF 03 Page 5 of 10
PART C2
C2.1 Site Information
Scope of Works for Construction and Rehabilitation of Waste Management Facility – LOT WMF 03 Page 6 of 10
PART C3
C3.1 Scope of Work (SoW)
Preliminaries
1. Site establishment and de-establishment:
Allow for assembling before commencement and dismantling after practical completion
of work, all temporary site utilities and facilities.
Rehabilitation Works
1. Repair cracks on both internal and external wall:
Hack out on sandcrete wall along all cracks on sandcrete walls internally and externally;
75mm wide x 25mm deep and fill with anti-crack mesh then refill (plaster) with 1:4
cement mortar mix.
2. Replace damaged wooden doors (2No. for inside storage boxes and 1No. for WMF
entrance) with steel grille doors complete with ironmongery:
Carefully remove damaged wooden panel door and store for possible re-use by Client.
Fabricate new steel grill door and install complete with all ironmongery (i.e. locks,
hinges, bolts etc.).
3. Repair damages to metal grille (mesh) atop of dwarf wall:
Inspect metal mesh and remove damaged section (whole grid including wooden frame if
necessary) and replace with new metal mesh making good all works disturbed.
4. Repair leakages to roof i.e. to CI sheets:
Inspect roof (C.I sheets) for leakages and apply roof sealant if applicable, if required,
carefully remove damaged roofing sheet and replace with new sheet of same specification
making good all works disturbed.
5. Empty pit and thoroughly clean, repair crack in wall, floor and suspended slab of pit:
Adhering to the standards for disposal of medical waste, carefully empty out all existing
pits and dispose off-site. Thoroughly clean entire area of pits. Inspect walls, floors and
Scope of Works for Construction and Rehabilitation of Waste Management Facility – LOT WMF 03 Page 7 of 10
suspended slab of pits for any cracks and repair (as per method provided in activity
3.1.3.1 above)
6. Re-paint all block wall, concrete surface and selected woodwork (internally and
externally) with an additional coat of approved paint including scraping of worn out
layers of existing paint:
Scrape off final worn out coat of all painted block walls, concrete surfaces and selected
wood works and prepare and apply one (or two) coat of superior quality (enamel or
emulsion) paint as approved by Supervising Engineer as per technical specification.
New Works
All new works shall be carried out as specified in the Technical Specification for the new
facility. (See Annex B.3)
1. Fabricate and install composite metal cover 600mm x 600mm in opening/manhole for
pits:
(Section 07 – Metal Work):
Fabricate composite metal cover for manhole of pits with 25mm x 25mm RHS as frame
and braces, 1.5mm steel plate cover, and 25mm diameter pipe as handle, the whole
fabricated and finish with three coats of red oxide anti-corrosive paint.
2. Construct external and upgrade internal temporary waste storage boxes:
(Section 01, 02, 03, 04, 05, 06, 07, 10 & 11):
Construct outside existing waste management facility in location specified by supervising
Engineer, 2Nr temporary waste storage boxes on either side of the main entrance, 1.8m
long x 1.8 m wide x 2.8m high with 100mm thick solid sandcrete block wall at 1.5m high,
atop is timber frame with steel mesh at 1.3m high to underneath of ring beam.
3. Provide and install Water Point i.e. standing tap and a durable flexible hose (at least 20m
long). Including connection to the nearest water source.
(Section 08 – Plumbing Installation):
Install galvanized metal tap complete with all pipe, elbows, tees, reducers, coupling and
valves and connect to an existing (closest) water source. Excavate trench and conceal all
pipes (HDPE) from WMF to source at least 200mm below ground level.
4. Install 2Nr light points and a single switch and connect to closest electrical source
complete with all conduits, cables and fittings.
(Section 09 – Electrical Installation):
Supply and connect 2Nr energy power saving light points and fittings including switches
(6Amp, 1gang 1way switch) and accessories by approved an manufacturer, including all
necessary assembling fixing accessories connections, flexible cords, jambs, concealing all
electrical cables in PVC conduit. Allow for the connection to the closest power source or
distribution board.
5. Install floor drain within structure.
(Section 08 – Plumbing Installation):
Construct weep hole (with 50mm diameter PVC pipes) at intervals of 1m, between floor
slab and walls to allow flow of water from within the facility into the newly constructed
drainage.
6. Construct new De Montfort Mark 9 incinerator (complete as per technical specification
and construction guidelines) including reinforced concrete slab.
(Section 03 – Concrete Work and Section 04 – Masonry 8.0)
Scope of Works for Construction and Rehabilitation of Waste Management Facility – LOT WMF 03 Page 8 of 10
7. Construct plain in-situ concrete apron 600mm wide x 150mm thick around perimeter of
structure and 3m in-front of structure.
(Section 12 – External Works):
Excavate ground around waste management facility (not exceeding 200mm), backfill and
compact selected hardcore materials, an average of 100mm thick, and construct using
250mm thick plain in-situ 1:2:4 mix concrete apron 900mm wide around building except
3m wide in front of building where waste management boxes will be constructed.
Including all formworks.
8. Construct extension for incinerator and new pit including suspended reinforced concrete
slab and manhole.
(Section 01, 02, 03, 04, 05, 06, 07, 10 & 11):
Create opening (900mm wide) from the side of existing WMF as access to newly
constructed extension (4m x 4m) as space for housing new De Montfort Mark 9
incinerator and waste disposal pit (1.5m wide and 1.5m long x 1.5m deep – with
suspended reinforced slab and 600mm x 600mm manhole and metal cover). The whole
works shall include, foundation and earth works, concrete and masonry work, roofing, in-
situ finishes and painting.
9. Construct rectangular concrete drainage:
(Section 12 – External Works):
Construct rectangular concrete drainage (600mm wide x 600mm deep) around perimeter
of structure along apron – with slope of 1.5% including soak away pit 1m x 1m x 1.2m
deep.
10. Construct chain-link fence with gate around WMF at an offset of approximately 600mm
from the concrete apron.
(Section 07 – Metal Work):
Provide and install steel chain-link fence of 4mm diameter gauge, with height of 2800mm
and average length 3000mm complete 50mm diameter steel pipe for use as chain link
fence columns installed in concrete bases at intervals of 3000m and with pipe length of
2900mm high. Fabricate and install steel gate from 50mm diameter pipes as frame
complete with mesh and, hinges and bolts - Double Leaves - Double Swing: 1500mm
wide x 2400mm high.
11. Construct concrete walkway (access for wheeled bins) from WMF to the nearest hospital
facility.
(Section 03 – Concrete Work):
Excavate in ground trench not exceeding 250mm deep x 1000mm wide. Backfill and
compacted selected hardcore aggregate and average of 100mm high. Construct using
200mm thick plain in-situ 1:2:4 mix concrete. Including all formworks.
Scope of Works for Construction and Rehabilitation of Waste Management Facility – LOT WMF 03 Page 9 of 10