Jerryboy Bolante's individual time record from September 25 to October 9, 2019 shows that he spent his time supervising various construction projects for Hypig Genetics Inc. such as installing a waterline and weighing scale, checking road elevations, and finalizing sewerage plans. He monitored work in Angat Marketing and at the meat cutting plant. On October 9th, he revised bills of materials for a road based on a plan from Dina and created a bill for a gate. The time record was acknowledged by Jerryboy Bolante and approved by the Managing Director.
Jerryboy Bolante's individual time record from September 25 to October 9, 2019 shows that he spent his time supervising various construction projects for Hypig Genetics Inc. such as installing a waterline and weighing scale, checking road elevations, and finalizing sewerage plans. He monitored work in Angat Marketing and at the meat cutting plant. On October 9th, he revised bills of materials for a road based on a plan from Dina and created a bill for a gate. The time record was acknowledged by Jerryboy Bolante and approved by the Managing Director.
Jerryboy Bolante's individual time record from September 25 to October 9, 2019 shows that he spent his time supervising various construction projects for Hypig Genetics Inc. such as installing a waterline and weighing scale, checking road elevations, and finalizing sewerage plans. He monitored work in Angat Marketing and at the meat cutting plant. On October 9th, he revised bills of materials for a road based on a plan from Dina and created a bill for a gate. The time record was acknowledged by Jerryboy Bolante and approved by the Managing Director.
Payroll Period Employee No: HGI342 From: 9/25/2019 Employee Name: Jerryboy Bolante To: 10/9/2019
Date Time In Time Out Location In Location Out Remarks
9/25/2019 8:00:00 AM 5:00:00 PM No Location Submitted No Location Submitted PDD Meeting 9/26/2019 8:00:00 AM 5:00:00 PM No Location Submitted No Location Submitted Supervise Angat Marketing Check the elevation of road for canal 23 Getha Rd, Tarlac City, 2300 Tarlac, Unnamed Road, Angat, Bulacan, outflow going to creek, Check the 9/27/2019 7:54:23 AM 5:42:18 PM Philippines Philippines elevation of road for outflow of water going to creek Unnamed Road, Angat, Bulacan, Scope of work in additional work in 9/28/2019 7:19:21 AM 5:21:45 PM No Location Submitted Philippines angat marketing. Supervise installation of waterline in 9/30/2019 7:21:35 AM 7:19:29 PM No Location Submitted No Location Submitted angat marketing Unnamed Road, Angat, Bulacan, Make rs for access road of angat and 10/1/2019 6:26:26 AM 6:40:43 PM No Location Submitted Philippines supervise marketing Check elevation of road access using 10/2/2019 7:26:18 AM 8:34:54 PM No Location Submitted No Location Submitted autolevel and follow up materials in atis farm Get elevation of road as per new 10/3/2019 7:28:47 AM 8:41:48 PM No Location Submitted No Location Submitted design and plot it in autocad for design of slope Make estimate and rs for materials that being use from angat marketing of qa room and changing room of 10/4/2019 7:52:43 AM 11:26:01 PM No Location Submitted No Location Submitted meat cutting plant.And make initial request for shower room and rain canal Baloganon, Masinloc, Zambales, Supervise installation of weighing 10/5/2019 6:28:25 AM 10:10:26 PM No Location Submitted Philippines scale Monitor accomplishments of angat 10/7/2019 7:40:05 AM 5:00:00 PM No Location Submitted No Location Submitted marketing.ty
Finalize sewerage to sir bert,
10/8/2019 8:15:44 AM 6:00:00 PM No Location Submitted No Location Submitted estimate materials for sewerage of angat marketing Remark revise bom for road as per Unnamed Road, Pandi, Bulacan, 10/9/2019 8:09:27 AM 5:28:15 PM No Location Submitted plan of ma'am Dina and make bom Philippines for gate
Acknowledge by: Checked by: Noted by:
JERRYBOY BOLANTE NICOLE CLAUDETTE UMBAC ARCH. DINA G. SY