BAR BENDING SCHEDULE RFI No: Date:

Drawing No: KMRL162-SQM1-G-S-02-01 Location: PC 5 (On grid B-B1/1-7) Structure: Pile


Di
length Total cutting length Dia wis
a No Nos Tota Cuttin Bend Total
SI Spacin Bar after
Shape of of per l g correctio cutting
No g No correctio 8 10 12 16 20
Ba set set Nos length n Length
n
r
Column C1 (Upto 9.25 Lvl) - 55 Nos

Main bar

10 10 16 1 9 9 3.624 0.000 3.624 32.616 0.000 0.000 0.000 32.616 0.000


3.62

Main bar

10 10 16 1 9 9 3.624 0.000 3.624 32.616 0.000 0.000 0.000 32.616 0.000


3.62

Confined Reinforcement I

0.690
11 0.075 11 0.240 0.240 8 1 18 18 2.060 0.080 1.980 35.640 35.640 0.000 0.000 0.000 0.000
0.690

Confined Reinforcement II

0.120
12 0.075 12 0.240 0.240 8 1 18 18 0.920 0.080 0.840 15.120 15.120 0.000 0.000 0.000 0.000
0.120

For URC Construction (P) Limited 1 of 6 For GC/EMBYE


BAR BENDING SCHEDULE RFI No: Date:

Drawing No: KMRL162-SQM1-G-S-02-01 Location: PC 5 (On grid B-B1/1-7) Structure: Pile


Di
length Total cutting length Dia wis
a No Nos Tota Cuttin Bend Total
SI Spacin Bar after
12 0.075 12 Shape of of per l g correctio
8 1 18 18 0.920 0.080 correctio 0.840 cutting
15.120 15.120 0.000 0.000 0.000 0.000
No g No 8 10 12 16 20
Ba set set Nos length n Length
n
r

Confined Reinforcement III


0.080

13 0.075 13 0.240 8 1 36 36 0.600 0.060 0.540 19.440 19.440 0.000 0.000 0.000 0.000

0.08

Confined Reinforcement III

0.080
0.075 0.690 8 1 18 18 1.050 0.060 0.990 17.820 17.820 0.000 0.000 0.000 0.000

0.08

NON Confined Reinforcement I

0.690
11 0.15 11 0.240 0.240 8 1 9 9 2.060 0.064 1.996 17.964 17.964 0.000 0.000 0.000 0.000
0.690

Confined Reinforcement II

0.120
12 0.15 12 0.240 0.240 8 1 9 9 0.920 0.064 0.856 7.704 7.704 0.000 0.000 0.000 0.000
0.120

For URC Construction (P) Limited 2 of 6 For GC/EMBYE


BAR BENDING SCHEDULE RFI No: Date:

Drawing No: KMRL162-SQM1-G-S-02-01 Location: PC 5 (On grid B-B1/1-7) Structure: Pile


Di
length Total cutting length Dia wis
a No Nos Tota Cuttin Bend Total
SI Spacin Bar after
12 0.15 12 Shape of
8 1 of per
9 l g correctio
9 0.920 0.064 correctio
0.856 cutting
7.704 7.704 0.000 0.000 0.000 0.000
No g No 8 10 12 16 20
Ba set set Nos length n Length
n
r

Confined Reinforcement III


0.080

13 0.075 13 0.240 8 1 18 18 0.600 0.060 0.540 9.720 9.720 0.000 0.000 0.000 0.000

0.08

Confined Reinforcement III

0.080
0.075 0.690 8 1 9 9 1.050 0.060 0.990 8.910 8.910 0.000 0.000 0.000 0.000

0.08

132.318 0.000 0.000 65.232 0.000


Total Length in (metre)

0.395 0.617 0.888 1.580 2.467


Unit weight of bar in kg

52.266 0.000 0.000 103.067 0.000


Total Weight of Bar in kg

Grand Total 155.332 kg

For URC Construction (P) Limited 3 of 6 For GC/EMBYE


09.11.2017

Structure: Pile cap


Total cutting length Dia wise

25 32

0.000 0.000

0.000 0.000

0.000 0.000

0.000 0.000

For URC Construction (P) Limited 4 of 6 For GC/EMBYE


09.11.2017

Structure: Pile cap


Total cutting length Dia wise
0.000
25 0.000
32

0.000 0.000

0.000 0.000

0.000 0.000

0.000 0.000

For URC Construction (P) Limited 5 of 6 For GC/EMBYE


09.11.2017

Structure: Pile cap


Total cutting length Dia wise
0.000
25 0.000
32

0.000 0.000

0.000 0.000

0.000 0.000

3.853 6.320

0.000 0.000

For URC Construction (P) Limited 6 of 6 For GC/EMBYE