You are on page 1of 1

SCHEDULE OF COLUMNS SCHEDULE OF BEAMS

COLUMN COLUMN DIM. BEAM BEAM DIM. REINFORCEMENT


MARK COLUMN REINFORCEMENT DETAILS
b (mm) d (mm) MARK b (mm) d (mm) @ END SUPPORT @ MID SPAN

C1 300 200 RB 200 300

NOTE: NOTE:
150mm TOWARDS MID HEIGHT, Fy = 275MPa (PNS GRADE 275) AND REST @ 150mm TOWARDS MID SPAN, Fy = 275MPa (PNS
GRADE 275)

SCHEDULE OF FOOTINGS
FOOTING FOOTING DIMENSION DEPTH REINFORCEMENT
MARK X (mm) Y (mm) Z (mm) (mm) (BOTHWAYS)

F1 1200 1200 300 1000

You might also like