Job Number Sheet

Job Title
Client
Calcs by Checked by Date

Continuous Beam: beam wall (Code of Practice : BS8110 - 1997)


3/30/2023 6:23:24 PM C01

Input Tables
fcu (MPa) 30
fy (MPa) 460
fyv (MPa) 460
% Redistribution 0
(O)ptimised or (D)ownward redistribution D
Top Cover :Reinforcement centre (mm) 60
Bottom Cover :Reinforcement centre (mm) 60
Dead load factor 1.4
Live load factor 1.6
Concrete density (kN/m3) 24
% of live load considered as permament 25
Ø (Creep coefficient) 2
Ecs (Shrinkage strain) 300E-6

Bw D Bf-top Hf-top Bf-bottom Hf-bottom Y-offset Web Flange


Section number (mm) (mm) (mm) (mm) (mm) (mm) (mm) offset offset

1 300 1000

Span Section Section Section


number length (m) number left number right

1 5.6 1

Support Code Column below Code Column above Code


number C,F F,P F,P
D (mm) B (mm) H (mm) D (mm) B (mm) H (mm)
2 F

Load W-left W-right a b P a M a Load


Case Span (kN/m) (kN/m) (m) (m) (kN) (m) (kNm) (m) Description

D 1 0 33.27
0 19 3.7
27.8

Span M left M right


number kNm kNm
200
100
100

-200
-400
-600
-800
.050
.100
.150
.200
.250
-100
-200
-300
1.50
1.00
.500
.400
.300
.200
.100

-300
-200
-100
.200 .200 .200 .200 .200 .200

.400 .400 .400 .400 .400 .400

SHEAR: X-X
.600 .600 .600 .600 .600 .600

MOMENTS: X-X
.800 .800 .800 .800 .800 .800

Shear Reinforcement: X-X


1.00 1.00 1.00 1.00 1.00 1.00

Bending Reinforcement: X-X


1.20 1.20 1.20 1.20 1.20 1.20
Client

1.40 1.40 1.40 1.40 1.40 1.40


Job Title

Calcs by
Job Number

1.60 1.60 1.60 1.60 1.60 1.60


Elastic Deflections (Alternate spans loaded)

1.80 1.80 1.80 1.80 1.80 1.80

2.00 2.00 2.00 2.00 2.00 2.00

2.20 2.20 2.20 2.20 2.20 2.20

2.40 2.40 2.40 2.40 2.40 2.40

2.60 2.60 2.60 2.60 2.60 2.60


Long-term Deflections (All spans loaded - using entered reinforcement)
2.80 2.80 2.80 2.80 2.80 2.80

3.00 3.00 3.00 3.00 3.00 3.00

3.20 3.20 3.20 3.20 3.20 3.20


Checked by

Deflection, Shear, Moment and Steel diagrams. Span 1

3.40 3.40 3.40 3.40 3.40 3.40

3.60 3.60 3.60 3.60 3.60 3.60

3.80 3.80 3.80 3.80 3.80 3.80

4.00 4.00 4.00 4.00 4.00 4.00

4.20 4.20 4.20 4.20 4.20 4.20

4.40 4.40 4.40 4.40 4.40 4.40

4.60 4.60 4.60 4.60 4.60 4.60

4.80 4.80 4.80 4.80 4.80 4.80


Date

5.00 5.00 5.00 5.00 5.00 5.00

5.20 5.20 5.20 5.20 5.20 5.20

5.40 5.40 5.40 5.40 5.40 5.40


Sheet

V max = -300.4kN @ 5.60m


Def max = 1.831mm @ 2.40m

As max = -771.1mm2 @ 5.60m


M max = -301.7kNm @ 5.60m

Asv max = .2739mm²/mm @ 0.00m


Def max = .4105mm @ 2.50m

5.60 5.60 5.60 5.60 5.60 5.60