Se ha utilizado como base para la elaboración de esta hoja de cálculo al API STANDARD
650 , ELEVENTH EDITION, , JUNE 2.007.
RECOMENDACIONES:
1) - Se deben de llenar todas las celdas en amarillo..
2) - La relación h1 / (r*t1)0.5 permite determinar tres valores de t2 - Estos valores se
calculan los tres automáticamente. En las celdas G335 y G336 se deben traspasar
manualmente el valor de t2 ,correspondiente a la fórmula de t2 , que exige la relación .
3) - La celda P950 debe ser llenada manualmente, dependiendo del diámetro del tanque.
10/15/2019
DATE : 9/25/2001
Customer :
Contractor :
Design :
Elabored :
Checked :
Approved :
DATA.
Design Condition : x
Test Condition : x
1 lbf/in2 = 0.00689473
CALCULATION NOTE.
V1 - ( t1 ) C.A. = 0.0630 in. HT(1) = 8.78
1.60 mm. 2.68
Material : A 633 Grade D Mod
Minimum Yield Strength : 50,000
YS =
344.74
Minimum Tensile Strength : 75,000
TS =
517.10
Product Design Stress : 30,000
Sd =
206.84
Hydrostatic Test Stress : 32,142
St =
221.61
Preliminary Values.
Design Conditions. tpd = 1.6798
42.67
1 - For the design conditions , t1d need not to be greater than tpd.
t1d = 1.6436
41.74
2 - For the hydrostatic test condition , t1t need not be greater than tpt.
t1t = 1.5543
39.47
Note : By Item 5.6.4.2 the required shell thickness for each shell course
shall be the greater of the design shell thickness plus any corrosion or
the hydrostatic test shell thickness , but the total shell thickness shall not
be less than the shell thickness required by 5.6.1.1 , 5.6.1.3 and 5.6.1.4
-
1- Unless otherwise specified by the purchaser, the nominal tank diameter shall be the
centerline diameter of the bottom shell-course plates.
2- Nominal plate thickness refers to the tank shell as constructed. The thickness specified
are based on erection requirements.
3- When specified by the purchaser , plate with a minimum nominal thickness of 6
millimeters may be substituted for 1/4-inch plate.
4- For diameters less than 15 m ( 50 ft ) but greater than 3.2 m ( 10.5 ft ) , the minimum
thickness of the lowest shell course only is increased to 6 mm ( 1/4" ).
5.6.1.3 The calculated stress for each shell course shall not be greater than the stress
permitted for the particular material used for the course. No shell course shall be thinner
than the course above it.
5.6.1.4 The tank shell shall be checked for stability against buckling from the design wind
speed in accordance with 5.9.7 . If required for stability , intermediate girders ,
increased shell-plate thickness , or both shall be used.
TEST CONDITIONS
V2 - ( t2 )
h1 / ( r t1 )0.5 = 1.982
NOTE :
If the value of the ratio is less than or equal to 1.375 : t2 = t1
If the value of the ratio is greater than 1.375 but less than 2.625 :
Item 5.6.4.6 To calculate the upper-course thicknesses for both the design condition and the hydrostatic
test conditon, a preliminary value tu for the upper-course thickness shall be calculated using the formulas
in 5.6.3.2 excluding any corrosion allowance, and then the distance x of the variable design point from the
bottom of the course shall be calculated using the lowest value obtained from the following:
Item 5.6.4.7 The minimum thickness tx for the upper shell courses shall be calculated for both the design
condition (tdx) and the hydrostatic test condition (tx) using the minimum value of x obtained from 5.6.4.6 :
Item 5.6.4.8 The steps described in 5.6.4.6 and 5.6.4.7 shall be repeated using the claculated value of tx
as tu until there is little difference between the calculated values of tx in succesion (repeating the steps
twice is normally sufficient ) . Repeating the steps provides a more exact location of the design point for
the course under consideration and, consequently , a more accuarate shell thickness.
H* = 57.07
17.40
FIRST TRIAL
ttx = 1.3735
34.89
tl = 1.5543
39.47
tu = ttx 1.3735
34.89
K = tl / tu 1.1314 K = tl / tu 1.1316
K0.5 = 1.0637 S.I. Units. K0.5 = 1.0638
C= 0.0634 C= 0.0635
(r*tu)0.5 = 49.9550
1268.89
x1 = 44.3979
1127.05
43.52 x2 = 43.5167
1103.22 1103.22
x3 = 60.9451
1548.05
x= 43.5167
1103.22
x / 12 = 3.6264
x / 1000 = 1.10
With this value of ttx , start the second trial. ttx = 1.3091
33.25
SECOND TRIAL.
tu = ttx 1.3091
33.25
tl = 1.5543
39.47
K = tl / tu 1.1872 K = tl / tu 1.1873
K =
0.5
1.0896 S.I. Units. K0.5 = 1.0896
C= 0.0889 C= 0.0890
(r*tu)0.5 = 48.7710
1238.72
x1 = 49.2448
1250.55
49.24 x2 = 60.9204
1250.55 1546.66
x3 = 59.5006
1511.24
x= 49.2448
1250.55
x / 12 = 4.1037
x / 1000 = 1.25
With this value of ttx , start the third trial. ttx = 1.2974
32.95
THIRD TRIAL.
tu = ttx 1.2974
32.95
tl = 1.5543
39.47
K = tl / tu 1.1980 K = tl / tu 1.1980
K =
0.5
1.0945 S.I. Units. K =
0.5
1.0945
C= 0.0938 C= 0.0937
(r *tu)0.5 = 48.5527
1233.11
x1 = 50.1613
1274.12
50.16 x2 = 64.2004
1274.12 1631.01
x3 = 59.2343
1504.39
x= 50.1613
1274.12
x / 12 = 4.1801
x / 1000 = 1.27
#1 #2 #3
1.5543 1.4287 1.2956
Ratio 39.47 36.28 32.90
1.982 ≤ 1.375 >1,375<2,625 ≥ 2.625
t2 = 1.4287
36.28
H* = 49.07
14.96
FIRST TRIAL
ttx = 1.1775
29.91
tl = 1.4287
36.28
tu = ttx 1.1775
29.91
K = tl / tu 1.2129 K = tl / tu 1.2133
K =
0.5
1.1013 S.I. Units. K =
0.5
1.1015
C= 0.1004 C= 0.1006
(r*tu)0.5 = 46.2541
1174.91
x1 = 47.1649
1197.19
47.16 x2 = 59.2184
1197.19 1501.54
x3 = 56.4300
1433.40
x= 47.16
1197.19
x / 12 = 3.9304
x / 1000 = 1.20
SECOND TRIAL.
tu = ttx 1.1057
28.08
tl = 1.4287
36.28
K = tl / tu 1.2920 K = tl / tu 1.2921
K =
0.5
1.1367 S.I. Units. K0.5 = 1.1367
C= 0.1345 C= 0.1345
(r*tu)0.5 = 44.8221
1138.39
x1 = 52.6832
1337.95
52.68 x2 = 79.1930
1337.95 2011.06
x3 = 54.6830
1388.83
x= 52.6832
1337.95
x / 12 = 4.3903
x / 1000 = 1.34
With this value of ttx , start the third trial. ttx = 1.0945
27.79
THIRD TRIAL.
tu = ttx 1.0945
27.79
tl = 1.4287
36.28
(r*tu)0.5 = 44.5932
1132.55
x1 = 53.5904
1361.09
53.59 x2 = 82.4642
1361.09 2094.50
x3 = 54.4037
1381.71
x= 53.5904
1361.09
x / 12 = 4.4659
x / 1000 = 1.36
H* = 40.29
12.28
FIRST TRIAL
ttx = 0.9625
24.45
tl = 1.0926
27.75
tu = ttx 0.9625
24.45
K = tl / tu 1.1347 K = tl / tu 1.1351
K =
0.5
1.0652 S.I. Units. K =
0.5
1.0654
C= 0.0650 C= 0.0652
(r*tu)0.5 = 41.8192
1062.30
x1 = 35.5934
903.31
31.51 x2 = 31.5114
797.85 797.85
x3 = 51.0194
1296.01
x= 31.5114
797.85
x / 12 = 2.6260
x / 1000 = 0.80
With this value of ttx , start the second trial. ttx = 0.9227
23.44
SECOND TRIAL.
tu = ttx 0.9227
23.44
tl = 1.0926
27.75
K = tl / tu 1.1839 K = tl / tu 1.1841
K0.5 = 1.0881 S.I. Units. K0.5 = 1.0882
S.I. Units.
C= 0.0874 C= 0.0876
(r*tu)0.5 = 40.9448
1040.00
x1 = 38.5241
978.06
38.52 x2 = 42.3367
978.06 1073.95
x3 = 49.9527
1268.79
x= 38.5241
978.06
x / 12 = 3.2103
x / 1000 = 0.98
With this value of ttx , start the third trial. ttx = 0.9084
23.07
THIRD TRIAL.
tu = ttx 0.9084
23.07
tl = 1.0926
27.75
K = tl / tu 1.2028 K = tl / tu 1.2028
K =
0.5
1.0967 S.I. Units. K =
0.5
1.0967
C= 0.0959 C= 0.0959
(r*tu)0.5 = 40.6260
1031.80
x1 = 39.6213
1006.25
39.62 x2 = 46.3733
1006.25 1177.67
x3 = 49.5637
1258.80
x= 39.6213
1006.25
x / 12 = 3.3018
x / 1000 = 1.01
H* = 31.52
9.61
FIRST TRIAL.
ttx = 0.7475
18.99
tl = 0.9061
23.01
tu = ttx 0.7475
18.99
K = tl / tu 1.2122 K = tl / tu 1.2122
K =
0.5
1.1010 S.I. Units. K =
0.5
1.1010
C= 0.1001 C= 0.1001
(r*tu)0.5 = 36.8543
936.24
x1 = 34.5903
878.68
34.59 x2 = 37.8410
878.68 961.16
x3 = 44.9623
1142.21
x= 34.5903
878.68
x / 12 = 2.8825
x / 1000 = 0.88
With this value of ttx , start the second trial. ttx = 0.7014
17.81
SECOND TRIAL.
tu = ttx 0.7014
17.81
tl = 0.9061
23.01
K = tl / tu 1.2919 K = tl / tu 1.2918
K =
0.5
1.1366 S.I. Units. K0.5 = 1.1366
C= 0.1344 C= 0.1344
(r*tu)0.5 = 35.6995
906.66
x1 = 38.0413
966.22
38.04 x2 = 50.8268
966.22 1291.11
x3 = 43.5534
1106.13
x= 38.0413
966.22
x / 12 = 3.1701
x / 1000 = 0.97
With this value of ttx , start the third trial. ttx = 0.6944
17.63
THIRD TRIAL.
tu = ttx 0.6944
17.63
tl = 0.9061
23.01
K = tl / tu 1.3050 K = tl / tu 1.3049
K =
0.5
1.1423 S.I. Units. K0.5 = 1.1423
C= 0.1399 C= 0.1399
(r*tu)0.5 = 35.5198
902.10
x1 = 38.5944
980.25
38.59 x2 = 52.8979
980.25 1343.65
x3 = 43.3342
1100.57
x= 38.5944
980.25
x / 12 = 3.2162
x / 1000 = 0.98
H* = 22.74
6.93
FIRST TRIAL.
tu = ttx ttx = 0.5326
13.53
tl = 0.6933
17.60
K = tl / tu 1.3008 K = tl / tu 1.3017
K =
0.5
1.1405 S.I. Units. K0.5 = 1.1409
C= 0.1381 C= 0.1385
(r*tu)0.5 = 31.1069
790.31
x1 = 31.0720
788.48
31.07 x2 = 37.8024
788.48 957.48
x3 = 37.9504
964.18
x= 31.0720
788.48
x / 12 = 2.5893
x / 1000 = 0.79
With this value of ttx , start the second trial. ttx = 0.4936
12.54
SECOND TRIAL.
tu = ttx 0.4936
12.54
tl = 0.6933
17.60
K = tl / tu 1.4042 K = tl / tu 1.4044
K =
0.5
1.1850 S.I. Units. K =
0.5
1.1851
C= 0.1798 C= 0.1799
(r*tu)0.5 = 29.9484
760.65
x1 = 33.9762
862.83
33.98 x2 = 49.0866
862.83 1246.36
x3 = 36.5370
927.99
x= 33.9762
862.83
x / 12 = 2.8314
x / 1000 = 0.86
With this value of ttx ,start the third trial. ttx = 0.4877
12.39
THIRD TRIAL.
tu = ttx 0.4877
12.39
tl = 0.6933
17.60
K = tl / tu 1.4214 K = tl / tu 1.4215
K 0.5
= 1.1922 S.I. Units. K0.5 = 1.1923
C 0.1865 C 0.1865
(r*tu)0.5 = 29.7680
756.03
x1 = 34.4425
874.77
34.44 x2 = 50.8875
874.77 1292.46
x3 = 36.3169
922.36
x= 34.4425
874.77
x / 12 = 2.8702
x / 1000 = 0.87
H* = 13.94
4.25
FIRST TRIAL.
tl = 0.4868
12.36
K = tl / tu 1.5335 K = tl / tu 1.5354
K 0.5
= 1.2384 S.I. Units. K 0.5
= 1.2391
C 0.2279 C 0.2286
(r*tu)0.5 = 24.0002
609.91
x1 = 26.8769
681.97
26.88 x2 = 38.2400
681.97 968.51
x3 = 29.2803
744.09
x= 26.8769
681.97
x / 12 = 2.2397
x / 1000 = 0.68
With this value of ttx, start the second trial. ttx = 0.2867
7.28
SECOND TRIAL.
tu = ttx 0.2867
7.28
tl = 0.4868
12.36
K = tl / tu 1.6977 K = tl / tu 1.6981
K 0.5
= 1.3030 S.I. Units. K 0.5
= 1.3031
C 0.2830 C 0.2831
(r*tu)0.5 = 22.8218
579.67
x1 = 29.0796
738.48
29.08 x2 = 47.3698
738.48 1202.77
x3 = 27.8426
707.19
x= 27.8426
707.19
x / 12 = 2.3202
x / 1000 = 0.71
With this value of ttx, start the third trial. ttx = 0.2847
7.23
THIRD TRIAL.
tu = ttx 0.2847
7.23
tl = 0.4868
12.36
K = tl / tu 1.7098 K = tl / tu 1.7098
K 0.5
= 1.3076 S.I. Units. K0.5 = 1.3076
S.I. Units.
C 0.2868 C 0.2868
(r*tu)0.5 = 22.7432
577.61
x1 = 29.2302
742.41
29.23 x2 = 47.9902
742.41 1218.97
x3 = 27.7467
704.69
x= 27.7467
704.69
x / 12 = 2.3122
x / 1000 = 0.70
H* = 5.17
1.57
FIRST TRIAL.
tu = ttx ttx = 0.1458
3.72
tl = 0.2849
7.23
K = tl / tu 1.9469 K = tl / tu 1.9542
K 0.5
= 1.3953 S.I. Units. K 0.5
= 1.3979
C 0.3555 C 0.3575
(r*tu)0.5 = 16.2746
414.11
x1 = 17.0183
189.05
17.02 x2 = 22.1586
189.05 559.77
x3 = 19.8551
505.21
x= 17.0183
189.05
x / 12 = 1.4182
x / 1000 = 0.19
With this value of ttx, start the second trial. ttx = 0.1311
4.04
SECOND TRIAL.
tu = ttx 0.1311
4.04
tl = 0.2849
7.23
K = tl / tu 1.7910 K = tl / tu 2.1723
K 0.5
= 1.3383 S.I. Units. K0.5 = 1.4739
C 0.3116 C 0.4112
(r*tu)0.5 = 15.4362
431.76
x1 = 17.5735
420.40
17.57 x2 = 25.4919
420.40 490.70
x3 = 18.8321
526.74
x= 17.5735
420.40
x / 12 = 1.4645
x / 1000 = 0.42
With this value of ttx, start the third trial. ttx = 0.1295
3.36
THIRD TRIAL .
tu = ttx 0.1295
3.36
tl = 0.2849
7.23
K = tl / tu 2.1500 K = tl / tu 2.1995
K 0.5
= 1.4663 S.I. Units. K 0.5
= 1.4831
C 0.4061 C 0.4174
(r*tu)0.5 = 15.3406
394.07
x1 = 17.6375
444.99
17.64 x2 = 25.8741
444.99 639.40
x3 = 18.7155
480.76
x= 17.6375
444.99
x / 12 = 1.4698
x / 1000 = 0.44
Corrosion Allowance.
Course. Material. C.A. = C.A. =
(in.) (mm.)
0 V8 A 283 Grade C 0.0630 1.60
0 V7 A 633 Grade D Mod 0.0630 1.60
0 V6 A 633 Grade D Mod 0.0630 1.60
0 V5 A 633 Grade D Mod 0.0630 1.60
0 V4 A 633 Grade D Mod 0.0630 1.60
0 V3 A 633 Grade D Mod 0.0630 1.60
0 V2 A 633 Grade D Mod 0.0630 1.60
0 V1 A 633 Grade D Mod 0.0630 1.60
ft.
m.
in.
mm.
ft.
m.
ft.
m.
°C
°C
°C
mbar
mbar
mbar
Mpa.
ft.
m.
lbf/in2
Mpa.
lbf/in2
Mpa.
lbf/in2
Mpa.
lbf/in2
Mpa.
in.
mm.
in.
mm.
in.
mm.
in.
mm.
in.
mm.
in.
mm.
in.
mm.
in.
mm.
in.
mm.
in.
mm.
oint Method.
hickness at design points
actual circumferential shell
s not specified that the 1 -
s : ( L/H ) <= ( 1000/6 ) or in
DESIGN CONDITIONS.
V2 - ( t2 )
in.
mm.
in.
mm.
in.
mm.
h1 / ( r t1 )0.5 =
#1
#2
#3
ft. V2 - ( t2 )
m.
lbf/in2
Mpa.
lbf/in2
Mpa.
lbf/in2
Mpa.
lbf/in2
Mpa.
ft.
m.
FIRST TRIAL
in.
mm.
in.
mm.
in.
mm.
K = tl / tu 1.1304
U.S. Units. K0.5 = 1.0632 S.I. Units.
C= 0.0630
in.
mm.
in.
mm.
in. 43.20
mm. 1095.10
in.
mm.
in.
mm.
ft.
m.
in.
mm.
K = tl / tu 1.1861
U.S. Units. K0.5 = 1.0891 S.I. Units.
C= 0.0884
in.
mm.
in.
mm.
in. 49.41
mm. 1254.62
in.
mm.
in.
mm.
ft.
m.
THIRD TRIAL.
in.
mm.
in.
mm.
K = tl / tu 1.1972
U.S. Units. K =
0.5
1.0942 S.I Units.
C= 0.0934
in.
mm.
in.
mm.
in. 50.35
mm. 1278.81
in.
mm.
in. 0
mm.
ft.
m.
#1
in. 1.5806
mm. Ratio 40.14
1.965 ≤ 1.375
in.
mm.
ft. V3 - (t3)
m.
lbf/in2
Mpa.
lbf/in2
Mpa.
lbf/in2
Mpa.
lbf/in2
Mpa.
ft.
m.
FIRST TRIAL
in.
mm.
in.
mm.
in.
mm.
K = tl / tu 1.2152
U.S. Units. K =
0.5
1.1024 S.I Units.
C= 0.1004
in.
mm.
in.
mm.
in. 47.61
mm. 1203.55
in.
mm.
in.
mm.
ft.
m.
SECOND TRIAL.
in.
mm.
in.
mm.
K = tl / tu 1.2951
U.S. Units. K0.5 = 1.1380 S.I Units.
C= 0.1357
in.
mm.
in.
mm.
in. 53.19
mm. 1350.06
in.
mm.
in.
mm.
ft.
m.
THIRD TRIAL.
in.
mm.
in.
mm.
K = tl /tu 1.3090
U.S. Units. K =
0.5
1.1441 S.I Units.
C= 0.1415
in.
mm.
in.
mm.
in. 54.11
mm. 1374.14
in.
mm.
in.
mm.
ft.
m.
lbf/in2
Mpa.
lbf/in2
Mpa.
lbf/in2
Mpa.
lbf/in2
Mpa.
ft.
mm.
FIRST TRIAL
in.
mm.
in.
mm.
in.
mm.
K = tl / tu 1.1336
U.S. Units. K =
0.5
1.0647 S.I Units.
C= 0.0645
in.
mm.
in.
mm.
in. 31.26
mm. 791.65
in.
mm.
in.
mm.
ft.
m.
SECOND TRIAL.
in.
mm.
in.
mm.
K = tl / tu 1.1821
U.S. Units. K0.5 = 1.0873 S.I Units.
U.S. Units. S.I Units.
C= 0.0866
in.
mm.
in.
mm.
in. 38.63
mm. 980.73
in.
mm.
in.
mm.
ft.
m.
THIRD TRIAL.
in.
mm.
in.
mm.
K = tl / tu 1.2019
U.S. Units. K =
0.5
1.0963 S.I Units.
C= 0.0955
in.
mm.
in.
mm.
in. 39.78
mm. 1010.24
in.
mm.
in.
mm.
ft.
m.
ft. V5 - (t5)
m.
lbf/in2
Mpa.
lbf/in2
Mpa.
lbf/in2
Mpa.
lbf/in2
Mpa.
ft.
m.
FIRST TRIAL.
in.
mm.
in.
mm.
in.
mm.
K = tl / tu 1.2111
U.S. Units. K =
0.5
1.1005 S.I Units.
C= 0.0996
in.
mm.
in.
mm.
in. 34.77
mm. 882.33
in.
mm.
in.
mm.
ft.
m.
SECOND TRIAL.
in.
mm.
in.
mm.
K = tl / tu 1.2920
U.S. Units. K0.5 = 1.1366 S.I Units.
C= 0.1344
in.
mm.
in.
mm.
in. 31.26
mm. 794.02
in.
mm.
in.
mm.
ft.
m.
THIRD TRIAL.
in.
mm.
in.
mm.
K = tl / tu 1.2790
U.S. Units. K0.5 = 1.1309 S.I Units.
C= 0.1290
in.
mm.
in.
mm.
in. 37.69
mm. 957.16
in.
mm.
in.
mm.
ft.
m.
ft. V6 - (t6)
m.
lbf/in2
Mpa.
lbf/in2
Mpa.
lbf/in2
Mpa.
lbf/in2
Mpa.
ft.
m.
FIRST TRIAL.
in. tu = tdx
mm.
in.
mm.
K = tl / tu 1.3043
U.S. Units. K0.5 = 1.1420 S.I Units.
C= 0.1396
in.
mm.
in.
mm.
in. 31.37
mm. 795.98
in.
mm.
in.
mm.
ft.
m.
SECOND TRIAL.
in.
mm.
in.
mm.
K = tl / tu 1.4097
U.S. Units. K =
0.5
1.1873 S.I Units.
C= 0.2224
in.
mm.
in.
mm.
in. 37.85
mm. 961.13
in.
mm.
in.
mm.
ft.
m.
THIRD TRIAL.
in.
mm.
in.
mm.
K = tl / tu 1.4425
U.S. Units. K0.5 = 1.2011 S.I Units.
C 0.1945
in.
mm.
in.
mm.
in. 35.20
mm. 893.93
in.
mm.
in.
mm.
ft.
m.
ft. V7 - (t7)
m.
lbf/in2
Mpa.
lbf/in2
Mpa.
lbf/in2
Mpa.
lbf/in2
Mpa.
ft.
m.
FIRST TRIAL.
in. tu = tdx
mm.
in.
mm.
K = tl / tu 1.5287
U.S. Units. K 0.5
= 1.2364 S.I Units.
C 0.2262
in.
mm.
in.
mm.
in. 26.91
mm. 682.92
in.
mm.
in.
mm.
ft.
m.
SECOND TRIAL.
in.
mm.
in.
mm.
K = tl / tu 1.6928
U.S. Units. K 0.5
= 1.3011 S.I Units.
C 0.2815
in.
mm.
in.
mm.
in. 29.12
mm. 739.45
in.
mm.
in.
mm.
ft.
m.
THIRD TRIAL.
in.
mm.
in.
mm.
K = tl / tu 1.7074
U.S. Units. K0.5 = 1.3067 S.I Units.
U.S. Units. S.I Units.
C 0.2861
in.
mm.
in.
mm.
in. 29.30
mm. 741.38
in.
mm.
in.
mm.
ft.
m.
ft. V8 - (t8)
m.
lbf/in2
Mpa.
lbf/in2
Mpa.
lbf/in2
Mpa.
lbf/in2
Mpa.
in.
mm.
FIRST TRIAL.
in. tu = tdx
mm.
in.
mm.
K = tl / tu 1.8542
U.S. Units. K 0.5
= 1.3617 S.I Units.
C 0.3300
in.
mm.
in.
mm.
in. 16.83
mm. 176.53
in.
mm.
in.
mm.
ft.
m.
SECOND TRIAL.
in.
mm.
in.
mm.
K = tl / tu 1.6904
U.S. Units. K0.5 = 1.3002 S.I Units.
C 0.2807
in.
mm.
in.
mm.
in. 17.37
mm. 414.94
in.
mm.
in.
mm.
ft.
m.
THIRD TRIAL .
in.
mm.
in.
mm.
K = tl / tu 2.0379
U.S. Units. K 0.5
= 1.4276 S.I Units.
C 0.3790
in.
mm.
in.
mm.
in. 17.43
mm. 440.07
in.
mm.
in.
mm.
ft.
m.
h1 / ( r t1 )0.5 = 1.9652
H* = 57.07 ft.
17.40 m.
tl = 1.5806 in.
40.14 mm.
K = tl / tu 1.1306
K0.5 = 1.0633 U.S. Units.
C= 0.0631
tl = 1.5806 in.
40.14 mm.
K = tl / tu 1.1862
K0.5 = 1.0891 U.S. Units.
C= 0.0885
tl = 1.5806 in.
40.14 mm.
K = tl / tu 1.1972
K =
0.5
1.0942 U.S. Units.
C= 0.0934
#2 #3
1.4569 1.3187
37.00 33.49
≥ 2.625
t2 = 1.4569
37.00
tl = 1.4569 in.
37.00 mm.
K = tl / tu 1.2156
K =
0.5
1.1025 U.S. Units.
C= 0.1016
tl = 1.4569 in.
37.00 mm.
K = tl / tu 1.2956
K0.5 = 1.1382 U.S. Units.
C= 0.1360
tl = 1.4569 in.
37.00 mm.
K = tl /tu 1.3091
K =
0.5
1.1442 U.S. Units.
C= 0.1416
tl = 1.1110 in.
28.21 mm.
K = tl / tu 1.1340
K =
0.5
1.0649 U.S. Units.
C= 0.0647
tl = 1.1110 in.
28.21 mm.
K = tl / tu 1.1824
K0.5 = 1.0874 U.S. Units.
U.S. Units.
C= 0.0868
tl = 1.1110 in.
28.21 mm.
K = tl / tu 1.2019
K =
0.5
1.0963 U.S. Units.
C= 0.0955
tl = 0.9220 in.
23.41 mm.
K = tl / tu 1.2117
K =
0.5
1.1008 U.S. Units.
C= 0.0999
tl = 0.9220 in.
23.41 mm.
K = tl / tu 1.1733
K0.5 = 1.0832 U.S. Units.
C= 0.0827
tl = 0.9220 in.
23.41 mm.
K = tl / tu 1.2790
K0.5 = 1.1309 U.S. Units.
C= 0.1290
tl = 0.7075 in.
17.97 mm.
K = tl / tu 1.3052
K0.5 = 1.1425 U.S. Units.
C= 0.1400
tl = 0.7075 in.
17.97 mm.
K = tl / tu 1.4099
K =
0.5
1.1874 U.S. Units.
C= 0.2225
tl = 0.7075 in.
17.97 mm.
K = tl / tu 1.4426
K0.5 = 1.2011 U.S. Units.
C 0.1945
tl = 0.4939 in.
12.54 mm.
K = tl / tu 1.5305
K 0.5
= 1.2372 U.S. Units.
C 0.2268
(r*tu)0.5 = 24.2132 in.
615.32 mm.
x1 = 26.9145 in.
682.92 mm.
x2 = 37.9513 in.
961.17 mm.
x3 = 29.5402 in.
750.69 mm.
x= 26.9145 in.
682.92 mm.
x / 12 = 2.2429 ft.
x / 1000 = 0.68 m.
tl = 0.4939 in.
12.54 mm.
K = tl / tu 1.6931
K 0.5
= 1.3012 U.S. Units.
C 0.2816
tl = 0.4939 in.
12.54 mm.
K = tl / tu 1.7074
K0.5 = 1.3067 U.S. Units.
U.S. Units.
C 0.2861
tl = 0.2895 in.
7.36 mm.
K = tl / tu 1.8582
K 0.5
= 1.3631 U.S. Units.
C 0.3311
tl = 0.2895 in.
7.36 mm.
K = tl / tu 2.0570
K0.5 = 1.4342 U.S. Units.
C 0.3838
tl = 0.2895 in.
7.36 mm.
K = tl / tu 2.0817
K 0.5
= 1.4428 U.S. Units.
C 0.3898