You are on page 1of 12

B: Adamjee Nagar Pump Station

Part-1: Civil Works


Unit Rate Amount
Sl No. Description of Items Unit
Quantity In Figure In Words In Figure In Words
1 2 3 4 5 6=5 7=3X5 8=7
1 Site preparation by manually removing all miscellaneous 16500.00 sqm 15 247500
04-180 objectional materials from entire site and removing soil upto 15cm
depth including uprooting stumps, jungle clearing, leveling dressing Two Hundred Forty Seven Thousand
etc. complete as per direction of Engineer in charge. Fifteen Taka
Five Hundred Taka

2 Construction of B.M. Pillars at site with first class brick in cement 8.00 Each 1305 10440
04-120 mortar (1:4) of size 38cmx38x=cmx75cm on cement concrete
(1:2:4) base of size 50cmx50cmx7.5cm with 12mm thick cement
plastering (1:2) on exposed surfaces of pillar and cement mortar on
top (1:2), with inscription of "BWDB" with 25cm of the pillar bellow
ground level etc. complete inluding ramming the backfill and the #NAME? #NAME?
cost of all materials as per direction of Engineer in charge.

3 Earth work by manual labour with clayey soil (minimum 30% clay, 17587.50 Cum 380 6683250
16-220 0-40% slit and 0-30% sand) in construction of cross bundh/ring
bundh as per design and specification with all leads and lifts
throwing the earth in layers not exceeding 150mm in thickness,
including breaking clods rough dressing clearing the jungle
removing stumps dug bailing and 75mm cambering etc. complete #NAME? #NAME?
as per direction of Engineer in charge.

4 (a) Extra rate for every additional lead of 15m or part thereof beyond 17587.50 Pldcum 24 422100
16-190 the intial lead of 30m upto a maximum of 19 leads (3m neglected)
for all kinds of earth work. (7 Nos lead)
#NAME? #NAME?

4 (b) Extra rate for every additional lift of 1.0m or part thereof beyond 8793.75 pltcum 66 580387.5
16-200 the intial lift of 1.5m (30cm neglected) for all kinds of earth work.
(3 Nos Lift)
#NAME? #NAME?
Unit Rate Amount
Sl No. Description of Items Unit
Quantity In Figure In Words In Figure In Words
1 2 3 4 5 6=5 7=3X5 8=7
5 Bailing out of water with all leads and lifts by manual labour or 97892.46 cum 25 2447311.5
12-310-20 pump with all arrangements for protection of ring bund and side
slopes of foundation pit against erosion or washout etc. complete
actual volume of work will be measured by sounding method
before starting the work as per direction of Engineer in charge. #NAME? #NAME?
By pump

6 Supplying at site U-shape hot rolled steel sheet pile of different 107.04 MT 125300 13412112
04-120 section of Phosphorus=0.04% (Maximum), Sulphur=0.04%
(Maximum), Tensile strength=> 490 N/mm2, Yield strength =>296
N/mm2, Elongation=15% (Minimum) including all taxes, freights,
incidental charges etc. complete as per direction of the Engineer #NAME? #NAME?
-in- charge

U-shape, hot-rolled steel sheet pile width= 400mm to 600mm:


height=> 100mm, Thickness>= 10.5mm (Web Thickness>= 10.5mm
44-240-10 FlangeThickness>= 10.5mm) Thickness shall be same for the whole
section.

7 Driving steel sheet piles of various sections and weights of any type 991.14 sqm 1900 1883166
44-290 of soil, by mechanical device including handling and placing in
position including supply of all materials and equipments related
with driving of sheet of piles including correcting leaning beyond
tolerance and other defects etc. complete (measurement will be #NAME? #NAME?
taken on projected with x height) as per direction of engineer in
charge.
Unit Rate Amount
Sl No. Description of Items Unit
Quantity In Figure In Words In Figure In Words
1 2 3 4 5 6=5 7=3X5 8=7

44-240-10 U-type or any other type: Upto 12.50m depth.


8 Lay-out of building works as per approved plan with 3782.24 sqm 50 189112
64-100 50mmx50mmx300mm wooden pegs, nails, nylon ropes, checking
the dimensions, marking the excavation edges with chalik power
and maintaining the centre line pegs till completion of foundation
works upto a safe level etc. complete includeing the cost of all #NAME? #NAME?
materials as per direction of Engineer in charge

9 Earth work by carried earth by truck/boat or any other means


16-360 supplied at contractor's own cost (including royalty) in
constructing/ resectioning of the embankment/ canal bank/ road
etc. in clayey soil (minimum 30% clay, 0-40% silt and 0-30% sand)
beyond the initial lead of 300m including throwing the spoils to a
profile in layers not exceeding 150mm in thickness, breaking clods,
benching the side slopes, stripping the base of embankment and
borrow pit area, dug bailling, cutting tree upto 200mm girth with
uprooting stumps,clearing jungles, bail out of water, rough dressing
and 150mm cambering at the centre of the crest etc. complete as
per design, specification and direction of Engineer in charge.

300m to 1.00km. 116835.59 Cum 390 45565880.1

16-360-10 #NAME? #NAME?

1.00km to 5.00km (Extra rate) 116835.59 Cum 100 11683559


16-360-20 #NAME? #NAME?
Unit Rate Amount
Sl No. Description of Items Unit
Quantity In Figure In Words In Figure In Words
1 2 3 4 5 6=5 7=3X5 8=7
10 Construction of R.C.C cast in situ bored piles in 1:1.5:3 upto
44-120 requried depth in all types of soils including driling and driving &
extracting temporary steel causing upto requried depth where
necessary with bentonite circulation, casting concrete with cement,
sand (FM>=2.50) and 20mm down graded shingles in leanest mix.
1:1.5:3 having minimum 28 day cylinder strength of 22.0N/mm2
including the cost of all materials, labour, equipments and all
incidental charges excluding the cost of M.S. work for
reinforcement etc. complete in all respect (measurement will be
given from the bottom of pile cap) as per design, drawing,
specification and direction of Engineer in charge.

600mm dia 20037.10 M 4840 96979564


44-120-30 Four Thousand Eight #NAME?
Hundred Forty Taka

11 Labour for breaking of head of cast situ bored pile/precuts pile 218.95 Cum 3550 777272.5
44-140 upto required length by any means and removing the dismantled
materials such as concrete to a safe distance including scrapping
and removing concrete from steel/ M.S. rods, all sorts of handling,
stacking the same properly after clearing, leveling and dressing the Three Thousand Five Seven Hundred Seventy Seven
site and clearing the river bed etc. complete as per direction of Thousand Two Hundred Seventy
Hundred Fifty Taka
Engineer in charge. Two Taka and Fifty Paisa

12 Providing and making joint of welding of minimum 300mmlength 14860.80 M 472.83 7026632.064
44-160 at the lapping portion of main reinforcements by electric arc
weldin for construction of cast in situ bored of pile carefully with
highly oxidized electrodes making the joint prominent, including
the of cost of all materials labour tools, plants and equipments cost
of power etc. complete in all respect as per direction of Engineer in #NAME? #NAME?
charge.
Unit Rate Amount
Sl No. Description of Items Unit
Quantity In Figure In Words In Figure In Words
1 2 3 4 5 6=5 7=3X5 8=7
13 Providing and making point welding at contact point of the sprial 827675 Point 4 3310700
44-150 binders at 0.5m intervals with the main inforcements by electric
arc welding and the rest to be binding with G.I. wire for
construction of cast insitu bored pile carefully with highly oxidised
eletrodes making the point including the cost of all materials,
labour, tools, plants and equiments, cost of power etc. complete in #NAME? #NAME?
all respect as per direction of Engineer in charge.

14 Carrying out pile load test with at least 2 times of designed load for
44-180 precast or cast in situ pile at sites, according to the ASTM standard
specification including the cost of installation of all kind of
equipment, materials labour technical manpower etc. for
conducting load tests and removing the installations and applied
load after test etc. complete as per direction Engineer in charge.

Design load upto 75.00 tonne 2.00 Each 274951 549902

44-180-30 #NAME? #NAME?

15 Drilling for Cast in situ Pile (600mm dia) in all types of soil including 6135.80 M 1088 6675750.4
Analysis driving & extracting temporary steel casing upto required depth
rate(GCB P. where necessary with bentonite circulation as per design drawing,
House specification and direction of Engineer in charge. #NAME? #NAME?
0.700)

16 Earth work in excavation of foundation trenches in all kinds of soils 35923.09 Cum 320 11495388.8
16-150 including leveling dressing placing removal of spoils to a safe
distance with initial lead of 30m and lift of 1.5m as per direction of Three Hundred
#NAME?
Engineer in charge. Twenty Taka

17 Extra rate for every additional lead of 15m or part thereof beyond 35923.09 Pldcum 24 862154.16
16-190 the initial lead of 30m upto a maximum of 19 leads (3m neglected) #NAME? #NAME?
for all kinds of earth work. (5 nos lead)
Unit Rate Amount
Sl No. Description of Items Unit
Quantity In Figure In Words In Figure In Words
1 2 3 4 5 6=5 7=3X5 8=7
18 Extra rate for every additional lift of 1.0m or part thereof beyond 17961.55 pltcum 66 1185462.3
16-200 the initial lift of 1.5m (30cm neglected) for all kinds of earth work.
(4 nos lift) #NAME? #NAME?

19 Cement concrete work in leanest mix. 1:3:6 with sand of FM>=1.5


28-120 in foundation or floor including breaking, screening, grading and
washing aggregates with clear water, mixing laying in position
consolidation to levels curing, including supply of all materials,
excluding the cost of formworks etc. complete as per direction of
Engineer in charge.

With 25mm down graded stone chips. 382.49 Cum 9250 3538032.5
28-120-20 #NAME? #NAME?

20 Reinforced cement concrete work in leanest mix. 1:1.5:3, with


Analysis 20mm down graded coarse aggregates and sand of FM>2.0 to
rate FM<=2.5, to attain a minimum 28 day cylinder strength of 24.0
N/mm2, including breaking, screening, grading, washing aggregates
with clear water, mixing, laying in forms, consolidation to levels,
curing, including supply of all materials, exluding cost of M.S. work
for reinforcements and formworks etc. complete and as per
direction of Engineer in charge.

with stone chips 6632.24 cum 13134 87107840.16

#NAME? #NAME?
Unit Rate Amount
Sl No. Description of Items Unit
Quantity In Figure In Words In Figure In Words
1 2 3 4 5 6=5 7=3X5 8=7
21 Formwork for centering and water tight shuttering as per drawing
36-150 with 12/14 BWG M.S. sheet, fitted and fixed with 40mm x 40mm x
6mm M.S. angle frame and 25mm x 6mm F.I. bar stiffener, with
necessary fabrication welding, making the forms including fitting,
fixing of steel forms with necessary ties, battens, struts, nut &
bolts, 38mm dia GI pipe/100mm dia bamboo/bullah propsrubber
pad etc. as desired shape and size including leveling and removing
the forms after specified period including the cost of all materials
as per direction of Engineer in charge.

Vertical and inclined walls, columns, piers with 60-80mm dia 8837.32 sqm 392 3464229.44
barrack bamboo props.
36-150-10 #NAME? #NAME?

Footing, footing beams, grade beams, foundation slab with 60- 776.07 sqm 392 304219.44
36-150-60 80mm dia barrack bamboo props. #NAME? #NAME?

22 Formwork for centering and water tight shuttering as per drawing


36-170 with 14 BWG MS sheet fitted and fixed with 40mm x 40mm x 6mm
MS angle frame and 25mm x 6mm FI bar stiffener with necessary
fabrication, welding and making the frames including fitting, fixing
the steel form with necessary ties, battens, struts, nuts & bolts,
props etc. as per desied shape and size including levelling and
removing the forms after specified period including the cost of all
materials etc. complete as per direction of Engineer in charge.

Deck slab, operation deck slab, top slab of barrel, above 6.5m 3318.11 Sqm 392 1300699.12
36-170-10 height with >= 125mm dia local hard wood bullah props. #NAME? #NAME?
Unit Rate Amount
Sl No. Description of Items Unit
Quantity In Figure In Words In Figure In Words
1 2 3 4 5 6=5 7=3X5 8=7
23 From work for centering water tigt shuttering as per drawing with
36-300 wooden planks of different thickness including supply of polythene
sheet (1KG covering 6.5 sqm) for making shuttering leakproof for
all sorts of R.C.C. works in building construction including fitting,
fixing by nail, tie rods, nuts and bolts to desired shape and size
including levelling and removing the forms etc. after specified
period including the cost of all materials as per direction Engineer
in charge.

Tie beam, lintel etc. with 40mm thick wooden planks with 51- 157.35 Sqm 392 61681.2
36-300-40 60mm dia barrack bamboo props. #NAME? #NAME?

24 M.S. Work for reinforcement with deformed M.S. bar, y=414/mm2,


76-120 (made from billet) in RCC works, including local handling, cutting,
forging, bending, cleaningand fabrication with supply of deformed
M.S. bar in different sizes and binding with 22 to 18 gages G.I. wire
etc. complete including the cost of all materials as per direction of
Engineer in charge.

8mm dia to 30mm dia 1731475.79 kg 88 152369869.52

76-120-10 #NAME? #NAME?

25 Back filling hydraulic structures including all leads and lifts in


16-540 150mm layer including watering ramming, compacting to 30%
relative density etc. complete by compator any other suitable
method as per direction of Engineer in charge.

Sand of FM>= 0.80 9370.33 Cum 860 8058483.8


16-540-20 #NAME? #NAME?

26 Earth work by manual labour in all kinds of soil in removing the 8137.50 Cum 380 3092250
16-240 cross bundh/ring bundh, including all leads and lifts complete and
placing the spoils to a safe distance (minimum 15m apart from the
bank) as per direction of Engineer in charge. #NAME? #NAME?
Unit Rate Amount
Sl No. Description of Items Unit
Quantity In Figure In Words In Figure In Words
1 2 3 4 5 6=5 7=3X5 8=7
27 Manufacturing and suplying C.C blocks in leanest mix. 1:3.5.5, with
40-200 cement, sand (FM>= 1.5) and shingles (40mm down graded), to
attain a 28 days cylinder strength of 10.5 N/mm2 including grading
washing shingles, mixing, laying in forms consolidation, curing for
at least 21 days including preparation of platform shutterring and
stacking in measurable stacks etc. complete including supply of all
materials (steel shutter to be used) as per direction of Engineer in
charge.

Block size 40cm x 40cm x 20cm 2946 Each 415 1222590


40-200-40 #NAME? #NAME?

28 Labour charge for protective works in laying CC blocks of different


40-220 sizes including preparation of base watering and ramming of base
etc. complete as per direction of Engineer in charge.

Within 200m 94.27 cum 2200 207394


40-220-10 #NAME? #NAME?

29 Supplying and laying dry 1st class or pick jhama chips as filter in
40-610 two layers (rop and bottom) as per specific size, range and
gradation, including breaking chips, grading, preparation of surface,
compacting each layer etc. complete with supply of all materials
and as per direction of Engineer in charge.

Well graded between 40mm to 20mm size 48.95 cum 5049 247148.55
40-610-20 #NAME? #NAME?

40-610-30 Well graded between 20mm to 5mm size 48.95 cum 2203 107836.85
#NAME? #NAME?
Unit Rate Amount
Sl No. Description of Items Unit
Quantity In Figure In Words In Figure In Words
1 2 3 4 5 6=5 7=3X5 8=7
30 Suppling and laying sand as filter layres as per specific size ranges
40-650 and gradation including preparation of surface, compacting in layer
etc. complete with supply of all materials and as per direction of
Engineer in charge.

FM : 1.0 to 1.5 90.5 cum 980 88690


40-650-30 #NAME? #NAME?
31 Supplying and placing non-woven needle punched type geotextile
40-600 fabric as filter materials of elongation>= 40% horizontal and vertical
permeability (under 2 kn/m2 pressure)=> 2x10E-3 m/sec. for
effective erosion protection in hydraulic structures/river trainig
works including localhandling, placing in position, providing
machine seamed joints (with 100% polypropeline or nylon thread)
or 35 cm lap in dry condition or minimum 100 cm lap under water
including protecting the geotextile material from UV ray and from
any other damages including supply of all materials, labours,
equipments etc. complete as per direction of Engineer in charge.
(Geotextile delivered at site should be certified by ISO and clearly
labelled with brand name and grade printed at regular intervals
accross the body of fabric)

40-600-40 Mass=> 400gm/m2, thickness (Under 2 kpa pressure)=> 3.00mm, 808.63 Sqm 245 198114.35
EoS<= 0.08mm, strip tenstile strength=> 23 kn/m, garb strength=>
1500N, CBR puncture resistance=> 3800N. #NAME? #NAME?
Unit Rate Amount
Sl No. Description of Items Unit
Quantity In Figure In Words In Figure In Words
1 2 3 4 5 6=5 7=3X5 8=7
32 Supply and fitting and fixing 23cm wide P.V.C water stops having
76-630 minimum strength of 13.880 N/mm2 at 225% elongation and
approved quaility in contraction and expansion joints with
necessary arrangements for modification in shuttering and keeping
the water stop in position etc. complete as per design, specification
and direction of Engineer in charge.

3 blub type 564.6 M 392 221323.2

76-630-10 #NAME? #NAME?

33 Supply & fitting, fixing S.S. pipes for railings


MR

25mm dia 183.00 M 450 82350


33(a) #NAME? #NAME?
50mm dia 73.5 M 900 66150
33(b) #NAME? #NAME?
34 Cunstructing at site, cement mortar gauge on masonry wall,
04-280 including engraving in meter, decimeter & centimeter, painting and
figuring with black and red water proof paint etc. complete as per
direction of Engineer in charge.

150mm x 25mm. 24.00 M 450 10800


04-280-10 #NAME? #NAME?
35 M.S. work in plates, angles, channels, flat bars, tees etc. including 1800.00 kg 145 261000
76-170 fabricating, machining, cutting, bending, welding, forging, drilling,
revettin, embedding anchor bars, staging and fitting, fixing, local
handling etc. complete with energy consumption and supply of
labours including the cost of materials as per design, specification #NAME? #NAME?
and direction of Engineer in charge.
Unit Rate Amount
Sl No. Description of Items Unit
Quantity In Figure In Words In Figure In Words
1 2 3 4 5 6=5 7=3X5 8=7
36 Cost/charge of Dewatering operation in order to lower down 1 L.S 11050000 11050000
12-180 ground water level at least 1.0m(one meter) below the bottom face
of the C.C. work and R.C.C. work of foundation slab(s) for
contruction of Adamjee Nagar Pumping Station under Dhaka O&M
Division-1, BWDB, Dhaka during the year 2017-2019 to provide
facility and environment for construction of the civil structural
works in full as approved in the design by installation at site of
required unit (Number) of piezometers and tube wells (at least
150mm dia or as requried) with all accessories (of tube well/
piezometers etc.) and operation of the tube wells with appropriate
pump machines for the period of construction, (as per
requriement) in order to attain the stipulated level of the ground
water table including cost of all materials, equipment, tools, power,
taxes, incidental charges as may be necessary and deductable leves
pursuant to the law, etc. all complete as per direction of the
Engineer in charge. Mode of Payment as follows:
i)After completiom of Foundation Trence & Casting of Lean #NAME? #NAME?
Concrete= 30%, ii) After completiom of R.C.C. work at Foundation=
20%, iii) After completiom of R.C.C. work upto +3.50 RL= 20%, iv)
After completiom of Block Placing at U/S & D/S Slope= 20%, v)
After completiom of all related work upto ground level= 10%

37 Filling of expansion joints upto a depth of 40mm with bitumen


04-620 mixed with coarse sand (FM>= 2.5) in concrete works including
supply of all materials etc. complete as per specification and
direction of Engineer in charge.

25mm wide. 97.81 M 196 19170.76

04-620-10 #NAME? #NAME?

485067517.214

Sub-Total of part-1 #NAME?