Progres Program 35.

000 MW
SUMATERA KALIMANTAN SULAWESI
285 (3%)
1.025 (11%)
2.247 (13%) 158 (5%)
218 (6%) 2.102 (27%)
150 (6%)
555 (21%) 3.310 (53%) TOTAL
INDONESIA
3.862 (40%) 9.721 (58%) 1.417 (42%) 2.947 (39%) 701(26%) 2.108 (34%)
3.920 (41%)
518 (5%) 4.822 (29%) 1.400 (42%) 2.584 (34%) 533 (20%) 815 (13%)
TOTAL 9,6 GW TOTAL 16.789 kms 165 (5%) TOTAL 7.633 kms 739 (27%) TOTAL 6.233 kms
TOTAL 3,4 GW TOTAL 2,7 GW
984 (3%)
8.430 (31%) 1.320 (28%) 2.153 (6%)
1.910 (42%)
5.360 (20%) 980 (21%) 12.006 (34%)
1.053 (23%) 17.678 (50%)
13.360 (49%) 2.430 (51%) 1.550 (35%) 2.614 (7%)
TOTAL 27.150 MVA TOTAL 4.730 MVA TOTAL 4.513 kms TOTAL 35,4 GW

15,197 (32%)
20.370 (44%)
JAWA BAGIAN BARAT 11.300 (24%)
TOTAL 46.866 kms
2.002 (35%)
3.115 (54%) 30.050 (27%)
611 (11%)
32.743 (30%)
TOTAL 5,7 GW
47.679 (43%)
TOTAL 110.472 MVA
795 (36%)
848 (39%)
535 (25%) INDEX
TOTAL 2.178 kms
PERENCANAAN
PENGADAAN
8.140 (30%) KONTRAK/PPA
BELUM KONSTRUKSI
7.168 (26%) PEMBANGKIT KONSTRUKSI
11.954 (44%) SLO/COD/KOMISIONING
TOTAL 27.262 MVA

PRA-KONSTRUKSI
KONSTRUKSI

JAWA TENGAH JAWA TIMUR, BALI & NUSA TENGGARA MALUKU & PAPUA TRANSMISI ENERGIZE/RLB/
KOMISIONING

2.110 (38%)
3.037 (48%) 136 (10%) 255 (30%) 1.595 (78%)
4.024 (34%) 105 (7%) 1.995 (35%) PRA-KONSTRUKSI
2.649 (41%) 250 (30%) 102 (5%)
7.725 (66%) 785 (55%) KONSTRUKSI
685 (11%)
1.516 (27%) 199 (24%) GARDU INDUK ENERGIZE/RLB/
52 (0%) 390 (28%) TOTAL 5.622 kms 138 (16%) 343 (17%)
TOTAL 11,8 GW TOTAL 6.371 kms TOTAL 1,4 GW TOTAL 2.040 kms KOMISIONING
TOTAL 0,8 GW

4.580 (16%) 5.210 (31%) 460 (33%) MW : Megawatt kms : kilometer-sirkit


12.907 (45%) 690 (49%) GW : Gigawatt MVA : Mega Volt Ampere
4.585 (28%) (Sama dengan
11.335 (39%) 6.790 (41%) 260 (18%) 1000 MW)

TOTAL 28.822 MVA TOTAL 16.585 MVA TOTAL 1.410 MVA

Data per 31 Agustus 2018

www.pln.co.id