You are on page 1of 19

CERINS CO.

, LTD
B-905, Woolim Blue 9 Business Center,
583, Yangcheon-ro, Gangseo-gu, Seoul, Republic of Korea
Tel: +82 2 337 4611 / e-mail: kor@cerins.net
CURRICULUM VITAE
NAME Qian Yihao
LOCATION China
EDUCATION Shanxi University of Science and Technology (Aug. 2006– Jul. 2010)- Applied Chemistry
Wuhan University of Technology (Aug. 2012– Jul. 2016)- Electrical automation and mech
anics
BIRTH OCTOBER, 1989
LANGUAGE Chinese – Mother Language
English-Spoken: Good/ Written: Good / Reading: Good (CET-4)
Years of 11 Years
Experience
QUALIFICATION Qualification Certificate China equipment engineer(APEC)
China Equipment Supervision Association (annual training)
SUMMARY 11 years’ work experiences in In the third-party inspection and trading company of power
transmission and transformation and electrical equipment, there are more than 11 years of
experience in transformers, combined electrical appliances, and grid operation inspection and
commissioning. We have rich field experience in mechanical equipment such as stacker and
reclaimer, oil pipeline. He has rich knowledge in equipment test witness and document review.

Not only very familiar with quality control and quality assurance essentials, but also proficient
in the use of national or international standards and regulations, including ISO, API, ASME,
AWS, ASNT, ASTM, GB, NB/T

In transformers, combined electrical appliances, wind turbines, towers, mainframes,


photovoltaic modules, inverters, cables, batteries, pumps, pipes and fittings, valves, forged
shafts, motors, tower interiors, steel structures, pipes, pipe racks , Cables, pressure vessels,
boilers, cooling tower fans, seamless pipes, and chimneys. and many more.

Perform various inspections and expedited activities on supplier facilities during manufacturing,
manufacturing and operational testing to verify that the supplier meets the purchase order and
project specifications. Cooperation, diligence, and commitment to the highest quality work.

Good team work spirit in different big projects.

Familiar with IEC、ISO、IEEE、 ASME

Good control the quality and progress. Flexible coordinating ability for the relation of
contractors/subcontractors and owner.
EXPERIENCES Professional Experience Details in Annex 1.

1
CERINS CO., LTD
B-905, Woolim Blue 9 Business Center,
583, Yangcheon-ro, Gangseo-gu, Seoul, Republic of Korea
Tel: +82 2 337 4611 / e-mail: kor@cerins.net
ANNEX 1.
PROFESSIONAL EXPERIENCE DETAILS
MAJOR PROJECTS WORKED:

Company Name: The 14th Bureau of China Water Resources Administration


Position: Supervision Engineer
Project name: Madagascar Hydropower Station No. 4 generator set and supporting equipment
November 2020 to December 2020
Location: Kunming
Responsibilities: Witness of factory test of generator set
Company Name: Huaneng Co., Ltd.
Conduct production liaison meetings and prepare meeting minutes
View product design drawings and inspect factory production lines against drawings
View relevant national standards, industry standards, and IEC standards. Check factory production proc
ess and factory production key point control according to standards
Witness the raw materials and purchase equipment, certificate and inspection report
Witness all production processes and suggest corrective quality issues
Witness FAT check
Final inspection/protection and marking inspection
Witness packaging and shipping load inspection
Comment on MTR and FAT files.
Write a supervisory summary report

Position: Supervision Engineer


Project name:Inspection of blades and complete equipment for Rudonghai 300MW wind power project;
July 2020 to October 2020
Location:Qingdao
Responsibilities:
Blade and other complete inspections for wind power projects
Importance of blades: It is one of the important components for wind turbines to convert wind energy into
mechanical energy. It is the basis for obtaining higher wind energy utilization coefficient and economic
benefits. The condition of the blades directly affects the performance and power generation efficiency of
the whole machine, and the blades bear Large load, harsh operating environment, wind, sun, rain forest,
lightning strike, corrosion, etc. will have a huge impact on the life of the blade
Fan blade inspection items and standards:
IEC 61400-23:
Static inspection, fatigue inspection, strength inspection, infrared imaging analysis, acoustic analysis,
ultrasonic inspection, blade surface quality control, etc.
Check factory production process and factory production key point control according to standard
Witness raw materials and purchased equipment, certificates and inspection reports
Witness all production processes and raise corrective quality issues
Witness FAT inspection
Final inspection/protection and marking inspection
Witness packaging and shipping load inspection
Comment on MTR and FAT files.
Write a summary report on supervision

Company Name: Dalian Huarui Heavy Industry Group Co., Ltd.


Position: Supervision Engineer
Project name: Australia Eliwana Mine Project
2
CERINS CO., LTD
B-905, Woolim Blue 9 Business Center,
583, Yangcheon-ro, Gangseo-gu, Seoul, Republic of Korea
Tel: +82 2 337 4611 / e-mail: kor@cerins.net
June 2020 to July 2020
Location: Dalian
Project scope: Stacker and reclaimer
Responsibilities:
Overall assembly and testing of Stacker and reclaimer
1. First inspection, in-process inspection and ex-factory inspection of the outsourcing factory, the products
are: frequency conversion cabinet, power cabinet, UPS, operating box, PLC cabinet and 10KV
transformer, according to the Australian/New Zealand standard.
2. Review project documents, including raw material reports, test reports, instrument inspection reports,
drawings and change records, technical q&A materials, project specifications, etc.
3. Inspection of final assembly plant, including
A. Installation inspection: installation of electromechanical equipment, bridge mounting, cable laying, cable
end connection, torque, cable insulation, lighting, hydraulic pressure, lubrication, water system, electrical
room installation, air conditioning system, grounding system.
B. Debugging: electrical room inspection, mechanical and electrical equipment function inspection, PLC
digital and analog sampling function test, reducer torque and temperature rise inspection, fire control
system, vehicle mechanism joint debugging, etc.
C. Data audit: inspection card audit, technical drawing change tracking, etc.

Company Name: Zhuji Feida Environmental Protection Co., Ltd.


Position: Supervision Engineer
Project name: South Korean rectifier and thermal power plant alarm system
June 2020
Location: Zhuji, Zhejiang
Project scope: rectifier and alarm system of thermal power plant
Responsibilities:
Production and testing of rectifiers and alarm systems in thermal power plants
Hold production liaison meetings and prepare meeting minutes
View product design drawings and check the factory production line according to the drawings
View relevant national standards, industry standards and IEC standards. Check factory production
process and factory production key point control according to standard
Witness raw materials and purchased equipment, certificates and inspection reports
Witness all production processes and raise corrective quality issues
Witness FAT inspection
Final inspection/protection and marking inspection
Witness packaging and shipping load inspection
Comment on MTR and FAT files.
Write a summary report on supervision

Company Name: Huaneng Co., Ltd.


Position: Supervision Engineer
Project name:Blade and other complete inspections of the Guazhou North Bridge Wind Power Project in
Gansu
May 2020 to June 2020
Location: Dalian
Responsibilities:
Blade and other complete inspections for wind power projects
Fan blade inspection items and standards:
IEC 61400-23:
Static inspection, fatigue inspection, strength inspection, infrared imaging analysis, acoustic analysis,
ultrasonic inspection, blade surface quality control, etc.
Check factory production process and factory production key point control according to standard
Witness raw materials and purchased equipment, certificates and inspection reports
Witness all production processes and raise corrective quality issues
Witness FAT inspection
Final inspection/protection and marking inspection
3
CERINS CO., LTD
B-905, Woolim Blue 9 Business Center,
583, Yangcheon-ro, Gangseo-gu, Seoul, Republic of Korea
Tel: +82 2 337 4611 / e-mail: kor@cerins.net
Witness packaging and shipping load inspection
Comment on MTR and FAT files.
Write a summary report on supervision

Company Name: Xi'an Xidian Transformer Co., Ltd.


Position: Supervision Engineer
Project Name: 220KV Substation in Zimbabwe
May 2020
Location: Xi'an
Project scope: 220KV transformer
Responsibilities:
Transformer production and testing
Hold production liaison meetings and prepare meeting minutes
View product design drawings and check the factory production line according to the drawings
View relevant national standards, industry standards and IEC standards. Check factory production
process and factory production key point control according to standard
Witness raw materials and purchased equipment, certificates and inspection reports
Witness all production processes and raise corrective quality issues
Witness FAT inspection
Final inspection/protection and marking inspection
Witness packaging and shipping load inspection
Comment on MTR and FAT files.
Write a summary report on supervision

Company Name: Guangzhou ABB Transformer Co., Ltd.


Position: Supervision Engineer
Project Name: Iraq 110KV Mobile Substation
April 2020 to May 2020
Location: Zhongshan, Guangzhou
Project scope: 110KV transformer
Responsibilities:
Transformer production and testing
Hold production liaison meetings and prepare meeting minutes
View product design drawings and check the factory production line according to the drawings
View relevant national standards, industry standards and IEC standards. Check factory production
process and factory production key point control according to standard
Witness raw materials and purchased equipment, certificates and inspection reports
Witness all production processes and raise corrective quality issues
Witness FAT inspection
Final inspection/protection and marking inspection
Witness packaging and shipping load inspection
Comment on MTR and FAT files.
Write a summary report on supervision

Company Name: Xi'an ABB Capacitor Co., Ltd.


Position: Supervision Engineer
Project Name: Capacitor Project of Mexico ABB Co., Ltd.
March 2020 to April 2020
Location: Xi'an
Project Scope: Capacitor
Capacitor production and testing
Responsibilities:
Production and testing process inspection of fire alarm system in thermal power plant
Responsibilities:
Hold production liaison meetings and prepare meeting minutes
4
CERINS CO., LTD
B-905, Woolim Blue 9 Business Center,
583, Yangcheon-ro, Gangseo-gu, Seoul, Republic of Korea
Tel: +82 2 337 4611 / e-mail: kor@cerins.net
View product design drawings and check the factory production line according to the drawings
View relevant national standards, industry standards and IEC standards. Check factory production
process and factory production key point control according to standard
Witness raw materials and purchased equipment, certificates and inspection reports
Witness all production processes and raise corrective quality issues
Witness FAT inspection
Final inspection/protection and marking inspection
Witness packaging and shipping load inspection
Comment on MTR and FAT files.
Write a summary report on supervision

Company Name: Shanghai Rockwell Electric Co, Ltd.


Position: Supervision Engineer
Project name: Iraqi 220KV thermal power plant fire alarm system
January 2020 to February 2020
Location: Shanghai
Project Scope: Fire Alarm System
Production and testing process inspection of fire alarm system in thermal power plant
Responsibilities:
Hold production liaison meetings and prepare meeting minutes
View product design drawings and check the factory production line according to the drawings
View relevant national standards, industry standards and IEC standards. Check factory production
process and factory production key point control according to standard
Witness raw materials and purchased equipment, certificates and inspection reports
Witness all production processes and raise corrective quality issues
Witness FAT inspection
Final inspection/protection and marking inspection
Witness packaging and shipping load inspection
Comment on MTR and FAT files.
Write a summary report on supervision

Company Name: Huaneng Co., Ltd.


Position: Supervision Engineer
Project name:CGN Wind Power Project Yuncheng Shiliping Blades and Complete Equipment
December2019-January 2020
Location: Guangzhou
Responsibilities:
Blade and other complete inspections for wind power projects
Fan blade inspection items and standards:
IEC 61400-23:
Static inspection, fatigue inspection, strength inspection, infrared imaging analysis, acoustic analysis,
ultrasonic inspection, blade surface quality control, etc.
Check factory production process and factory production key point control according to standard
Witness raw materials and purchased equipment, certificates and inspection reports
Witness all production processes and raise corrective quality issues
Witness FAT inspection
Final inspection/protection and marking inspection
Witness packaging and shipping load inspection
Comment on MTR and FAT files.
Write a summary report on supervision

Company Name: Henan Zhongheng Electric Co., Ltd.


Position: Supervising Engineer
Project:Longyuan Hunan Baolian Longhui 35KV Box Transformer
5
CERINS CO., LTD
B-905, Woolim Blue 9 Business Center,
583, Yangcheon-ro, Gangseo-gu, Seoul, Republic of Korea
Tel: +82 2 337 4611 / e-mail: kor@cerins.net
November 2019-January 2020
Location: Hunan
Project scope:35KV box transformer
It includes transformers, tap-changers, 35kV plug-in fuse fuses, pressure relief valves, high and low voltage
bushings, load switches, current transformers, circuit breakers, surge protectors, etc. The complete set of
equipment includes complete sets of equipment such as rectifiers, high-voltage cables and photovoltaic panels.

Responsibilities:
Hold production liaison meeting and prepare meeting minutes
View product design drawings and check factory production lines based on the drawings
View relevant national standards, industry standards and IEC standards. Check the factory production
process and factory production key point control according to standards
Witness raw materials and purchased equipment, certificates and inspection reports
Witness all production processes and raise corrective quality issues
Witness FAT inspection
Final inspection / protection and marking inspection
Witness packaging and transportation load inspection
Comment on MTR and FAT files.
Write a summary report of supervision, a weekly project progress quality report and a summary of su
pervision work, and submit the audit data of the main components to the owner, and the audit result re
port of the factory test.

Company Name: Chint Intelligent Electric Northwest Industria.


Position: Supervising Engineer
Project:Central American Mexico SESELEC AM2 copensation programm
copensation programmLocation: Xi'an
October 2019
High-voltage shunt capacitor compensation device
Complete equipment, capacitor unit, reactor, current transformer, circuit breaker Responsibilities:
Conduct production liaison meetings and prepare meeting minutes
View product design drawings and inspect factory production lines against drawings
View relevant national standards, industry standards, and IEC standards. Check factory production proc
ess and factory production key point control according to standards
Witness the raw materials and purchase equipment, certificate and inspection report
Witness all production processes and suggest corrective quality issues
Witness FAT check
Final inspection/protection and marking inspection
Witness packaging and shipping load inspection
Comment on MTR and FAT files.
Write a supervisory summary report

Company Name: Guangzhou Zhongche Junfa Electric Co., Ltd.


Position: Supervising Engineer
Project: Longyuan Hunan Longhui Baolian Photovoltaic Project
Location: Guangzhou, Guangdong
August-September 2019
Equipment specifications: 50MWp photovoltaic power station (including American box transformer
35KV, string inverter, cable, 10KV switch cabinet and other equipment)
Responsibilities:
Conduct production liaison meetings and prepare meeting minutes
View product design drawings and inspect factory production lines against drawings
6
CERINS CO., LTD
B-905, Woolim Blue 9 Business Center,
583, Yangcheon-ro, Gangseo-gu, Seoul, Republic of Korea
Tel: +82 2 337 4611 / e-mail: kor@cerins.net
View relevant national standards, industry standards, and IEC standards. Check factory production proc
ess and factory production key point control according to standards
Witness the raw materials and purchase equipment, certificate and inspection report
Witness all production processes and suggest corrective quality issues
Witness FAT check
Final inspection/protection and marking inspection
Witness packaging and shipping load inspection
Comment on MTR and FAT files.
Write a supervisory summary report

Company Name: Guangdong Jiangmen Haihong Electric Co., Ltd.


Position: Supervising Engineer
Project: Guangdong Yudian Shaoguan Power Plant Ash Field Photovoltaic Project
Location: Jiangmen, Guangdong
May-July 2019
Equipment specifications: 60MWp photovoltaic power station (including American box transformer
35KV, string inverter, 80kW, cable, 10KV switch cabinet and other equipment)
Responsibilities:
Conduct production liaison meetings and prepare meeting minutes
View product design drawings and inspect factory production lines against drawings
View relevant national standards, industry standards, and IEC standards. Check factory production proc
ess and factory production key point control according to standards
Witness the raw materials and purchase equipment, certificate and inspection report
Witness all production processes and suggest corrective quality issues
Witness FAT check
Final inspection/protection and marking inspection
Witness packaging and shipping load inspection
Comment on MTR and FAT files.
Write a supervisory summary report

Company Name: Nanyang Jinguan Electric Co., Ltd.


Position: Supervising Engineer
Project: KAFUE GORGE LOWER HYDROELECTRIC PROJECT 330kV arrester and other equipment
Location: Nanyang, Henan
April 2019
Equipment specifications: 330KV arrester 24 sets,11kV fuse and arrester 13 sets
Responsibilities:
Conduct production liaison meetings and prepare meeting minutes
View product design drawings and inspect factory production lines against drawings
View relevant national standards, industry standards, and IEC standards. Check factory production proc
ess and factory production key point control according to standards
Witness the raw materials and purchase equipment, certificate and inspection report
Witness all production processes and suggest corrective quality issues
Witness FAT check
Final inspection/protection and marking inspection
Witness packaging and shipping load inspection

7
CERINS CO., LTD
B-905, Woolim Blue 9 Business Center,
583, Yangcheon-ro, Gangseo-gu, Seoul, Republic of Korea
Tel: +82 2 337 4611 / e-mail: kor@cerins.net
Comment on MTR and FAT files.
Write a supervisory summary report

Company Name: Chongqing Sichuan Instrument Automation Co., Ltd.


Position: Supervising Engineer
Project: Zhuhai LNG Cabin Sampling and Analysis System Test
Location: Chongqing
March 2019
Equipment Specifications: LNG Cabin Sampling and Analysis System (co-designed and developed
by CNOOC Guangdong Zhuhai Jinwan LNG Co., Ltd. and Chongqing Chuanyi Automation Co., Lt
d.)
Responsibilities:
Conduct production liaison meetings and prepare meeting minutes
View product design drawings and inspect factory production lines against drawings
View relevant national standards, industry standards, and IEC standards. Check factory production proc
ess and factory production key point control according to standards
Witness the raw materials and purchase equipment, certificate and inspection report
Witness all production processes and suggest corrective quality issues
Witness FAT check
Final inspection/protection and marking inspection
Witness packaging and shipping load inspection
Comment on MTR and FAT files.
Write a supervisory summary report

Company Name: Xi'an Xidian High Voltage Switch Co., Ltd.


Position: Supervising Engineer
Project: Indonesian Dexin Iron and Steel Co., Ltd. Annual production of 3.5 million tons of steel
construction project 2 × 100MW gas generator set 2 × 335t / h gas boiler
Location: Xi'an, Shaanxi
February 2019
Equipment specifications: 150kV GIS and accessories 4 interval (model ZF1-252kV)
Responsibilities:
Conduct production liaison meetings and prepare meeting minutes
View product design drawings and inspect factory production lines against drawings
View relevant national standards, industry standards, and IEC standards. Check factory production proc
ess and factory production key point control according to standards
Witness the raw materials and purchase equipment, certificate and inspection report
Witness all production processes and suggest corrective quality issues
Witness FAT check
Final inspection/protection and marking inspection
Witness packaging and shipping load inspection
Comment on MTR and FAT files.
Write a supervisory summary report

Company Name: Huaneng Co., Ltd.


Position: Supervision Engineer
Project name:nspection of blades and complete sets of equipment for the 100MWp photovoltaic station

8
CERINS CO., LTD
B-905, Woolim Blue 9 Business Center,
583, Yangcheon-ro, Gangseo-gu, Seoul, Republic of Korea
Tel: +82 2 337 4611 / e-mail: kor@cerins.net
project in Dabaodang Town, Shenmu, Shaanxi,
January2019to February 2020
Location: Dalian
Responsibilities:
Blade and other complete inspections for wind power projects
Fan blade inspection items and standards:
IEC 61400-23:
Static inspection, fatigue inspection, strength inspection, infrared imaging analysis, acoustic analysis,
ultrasonic inspection, blade surface quality control, etc.
Check factory production process and factory production key point control according to standard
Witness raw materials and purchased equipment, certificates and inspection reports
Witness all production processes and raise corrective quality issues
Witness FAT inspection
Final inspection/protection and marking inspection
Witness packaging and shipping load inspection
Comment on MTR and FAT files.
Write a summary report on supervision

Company Name: Anzhixin Equipment Inspection Company


Position: Supervising Engineer
Project: Guangdong Yudian Shaoguan Power Plant Ash Field Photovoltaic Project
Location: Hengyang, Hunan
January 2019
Equipment specifications: European box transformer
YBW-40.5-2200 2 sets
YBW-40.5-2200 12 sets
YBW-40.5-2200 2 sets
YBW-40.5-1600 1 set
Responsibilities:
Conduct production liaison meetings and prepare meeting minutes
View product design drawings and inspect factory production lines against drawings
View relevant national standards, industry standards, and IEC standards. Check factory production proc
ess and factory production key point control according to standards
Witness the raw materials and purchase equipment, certificate and inspection report
Witness all production processes and suggest corrective quality issues
Witness FAT check
Final inspection/protection and marking inspection
Witness packaging and shipping load inspection
Comment on MTR and FAT files.
Write a supervisory summary report

Company Name:Anzhixin Equipment inspection company


Position: Supervising Engineer
Project: Guangzhou Development Taishan Fishery Photovoltaic Industrial Park Phase II Project
Location: Xiamen Kehua Hengsheng Co., Ltd.
October to December 2019
Equipment Specifications: Photovoltaic grid-connected inverter
SPI36K-B (1 set)
1.25MW photovoltaic grid-connected inverter (2 sets) DC input circuit number 10 channels 1 set;
2 sets; three-phase three-wire
Specification model: SPI1250K-B-H
2.5MW Photovoltaic Grid-Connected Inverter (16 sets) Contains 2 SPI1250K-B-H inverters, 10 sets
9
CERINS CO., LTD
B-905, Woolim Blue 9 Business Center,
583, Yangcheon-ro, Gangseo-gu, Seoul, Republic of Korea
Tel: +82 2 337 4611 / e-mail: kor@cerins.net
of DC input channels, 1 set of three-phase three-wire
Specification model: SPI2500K-B-H
Responsibilities:
Open quality meeting and write a meeting minutes
View product design drawings
View relevant national standards, industry standards
Witness the physical and ex-certificate of raw materials and purchased equipment
Witness all production processes and propose rectification of quality issues
Witness FAT inspection
Final inspection/protection and marking inspection
Witness Packing & shipping loading inspection
Review MTR & FAT doc.
Expediting the vendor documents submitting
write the supervision summary report

Company name: Sungrow Power Supply Co., Ltd.


Position: supervisory engineer
Project: China power construction group guizhou engineering co., LTD. 37.625 MW photovoltaic p
overty alleviation project
Cooperation project location: hefei
In January 2019
28 sets of 1260kW centralized inverter
Responsibilities:
Open quality meeting and write a meeting minutes
View product design drawings
View relevant national standards, industry standards
Witness the physical and ex-certificate of raw materials and purchased equipment
Witness all production processes and propose rectification of quality issues
Witness FAT inspection
Final inspection/protection and marking inspection
Witness Packing & shipping loading inspection
Review MTR & FAT doc.
Expediting the vendor documents submitting
write the supervision summary report

Company Name: Shangdu Fusheng Solar Technology Co., Ltd.


Position: Supervision Engineer
Project: 37.625MW Photovoltaic Poverty Alleviation Project of China Power Construction Group G
uizhou Engineering Co., Ltd.
Location: Hefei Sunshine Power Supply
June-August 2018
Equipment specifications: 28 sets (DC input circuit number 18 channels 1 set; DC input circuit n
umber 16 channels 27 sets) 1260kW centralized inverter
Responsibilities:
Open quality meeting and write a meeting minutes
View product design drawings
View relevant national standards, industry standards
Witness the physical and ex-certificate of raw materials and purchased equipment
Witness all production processes and propose rectification of quality issues
Witness FAT inspection
Final inspection/protection and marking inspection
Witness Packing & shipping loading inspection
10
CERINS CO., LTD
B-905, Woolim Blue 9 Business Center,
583, Yangcheon-ro, Gangseo-gu, Seoul, Republic of Korea
Tel: +82 2 337 4611 / e-mail: kor@cerins.net
Review MTR & FAT doc.
Expediting the vendor documents submitting
write the supervision summary report

Company Name: Shangdu Fusheng Solar Technology Co., Ltd.


Position: Supervision Engineer
Project: 37.625MW Photovoltaic Poverty Alleviation Project of China Power Construction Group G
uizhou Engineering Co., Ltd.
Location: Hefei Sunshine Power Supply
June-August 2018
Equipment specifications: 28 sets (DC input circuit number 18 channels 1 set; DC input circuit n
umber 16 channels 27 sets) 1260kW centralized inverter
Responsibilities:
Open quality meeting and write a meeting minutes
View product design drawings
View relevant national standards, industry standards
Witness the physical and ex-certificate of raw materials and purchased equipment
Witness all production processes and propose rectification of quality issues
Witness FAT inspection
Final inspection/protection and marking inspection
Witness Packing & shipping loading inspection
Review MTR & FAT doc.
Expediting the vendor documents submitting
write the supervision summary report

Name of Company: ITT


Position: piping & welding Inspector &expeditor
Project: KUWAIT AL-ZONE REFINERY PROJECT(HEATING FURNANCE/DCUTS / DAMPER / TU
BE SHEET / GAS PANNEL)
Location:Shang Hai
May.2018
Responsibilities:
Open quality meeting and write a meeting minutes
View product design drawings
View relevant national standards, industry standards
Witness the physical and ex-certificate of raw materials and purchased equipment
Witness all production processes and propose rectification of quality issues
Witness FAT inspection
Final inspection/protection and marking inspection
Witness Packing & shipping loading inspection
Review MTR & FAT doc.
Expediting the vendor documents submitting
write the supervision summary report

Position: QC Engineer
Project (Name, Location): Akkudrin Jeganza Kazakhstan comprehensive treatment of oil field natural gas
Product:In total 51 Pressure Vessels fabricated as per ASME VIII-1 without U stamp, 78 Pressure Ves
sel Skids fabricated.
April. 2018
Responsibilities:

11
CERINS CO., LTD
B-905, Woolim Blue 9 Business Center,
583, Yangcheon-ro, Gangseo-gu, Seoul, Republic of Korea
Tel: +82 2 337 4611 / e-mail: kor@cerins.net
Review WPS/PQR and quality procedure document
Reviewed the construction document, including but not limited to the ITP, WPS, welder qualification, ND
T personal qualification.
Material test and certificate(chemical composition analysis and mechanical property performance)
Positive material identification(PMI) of main parts
NDT witness and review reports
Hydrostatic test , injection test,leaking test
Conveyor no-loading running test,bulk machine running test
Visual inspection and dimension check after welding

Blasting and painting inspection


Sign release note after final inspection

Project:Rajamandala Hydroelectric Power Project 1×47MW


Position: Inspector engineer
Item:Transformer test
Manufacturer:Nantong Hyosung
March. 2018
Responsibility:
Pre-production meeting with manufacturer for inspection testing plan
Review fabrication process control and inspection, production schedule
Client technical requirements interpretation
Manufacturer detail design and engineering review to client’s Requirements
Fabrication process control and approved procedure implementation surveillance
Key testing witness
Review of WPS, PQR, and Welding quality Control
Dimension check and visual inspection
Comprehensive inspection and expediting report
Technical support to client rep. Visit to manufacturer
Corrective action recommendation to both client and manufacturer for quality problem and
project delay

Position: Inspector engineer


Location_65 MWP HN Ge Er MU Solar PV Project: Ge Er MU Electricity Generating Co., Ltd.(Qin
g Hai province)
Date: Feb. 2018-Apr. 2018
Equipment: Solar PV Module
Responsibility:
Review project specification, procedures and ITP
Raw material certificates review and endorsement:
Cell / Cell connector / Glass / EVA / Back sheet / Frame / Silicone for frame / Silicone for
J-Box bottom / Junction box / Process Card
Verification above material manufacturers to be applied as per approved BOM
FAT witness as per QAP and AQL:
Appearance / Dimensions / HI-pot & Insulation / Flash test and IV data measurement / EL
Testing / Wet Leakage / Labeling details and label rubbing test / Packing and Marking

Project:Ning Xia flow line


Position: Inspector
Item:seamless pipe
Manufacturer: Shanghai SI Yuan
Oct. 2017-Jan. 2018
Responsibility:
12
CERINS CO., LTD
B-905, Woolim Blue 9 Business Center,
583, Yangcheon-ro, Gangseo-gu, Seoul, Republic of Korea
Tel: +82 2 337 4611 / e-mail: kor@cerins.net
Pre-production meeting with manufacturer for inspection testing plan
Review fabrication process control and inspection, production schedule
Client technical requirements interpretation
Manufacturer detail design and engineering review to client’s Requirements
Fabrication process control and approved procedure implementation surveillance
Key testing witness
Review of WPS, PQR, and Welding quality Control
Dimension check and visual inspection
Comprehensive inspection and expediting report
Technical support to client rep. Visit to manufacturer
Corrective action recommendation to both client and manufacturer for quality problem and
project delay

Project:Transformer(700000/750kVA)
Client: Yongxin Vietnam power plant
Vendor:Hengyang Tebiandiangong Electric Co., Ltd
Date:2017.08—2018.04

Manufacturer: Shanghai XD
Position: Inspector
March. 2017-June. 2017
Project:Ning Xia Electrified Wire Netting
Responsibility:
Pre-production meeting with manufacturer for inspection testing plan
Review fabrication process control and inspection, production schedule
Client technical requirements interpretation
Manufacturer detail design and engineering review to client’s Requirements
Fabrication process control and approved procedure implementation surveillance
Key testing witness
Review of WPS, PQR, and Welding quality Control
Dimension check and visual inspection
Comprehensive inspection and expediting report
Technical support to client rep. Visit to manufacturer
Corrective action recommendation to both client and manufacturer for quality problem and
project delay

Project: Yue Quan


Jun. 2016- Apirl. 2017
Inspector
VISUAL & Dimension inspection
Witness hydrostatic test valve function test of low temperature helium leak test, etc
Witness FAT inspection
Witness Packing inspection
Document review and signature.
complete FAT report sent to the customer

Project:Xiang Yang
Position: Inspection engineer
Supplier: XD line
Oct. 2016- Dec. 2016
Responsibility:
Witness shell’s hydrostatic test
Witness valve body- stainless steel PMI test

13
CERINS CO., LTD
B-905, Woolim Blue 9 Business Center,
583, Yangcheon-ro, Gangseo-gu, Seoul, Republic of Korea
Tel: +82 2 337 4611 / e-mail: kor@cerins.net
Witness FAT inspection
VISUAL & Dimension inspection
Witness hydrostatic test valve function test of low temperature helium leak test, etc.
Witness Packing inspection & Ship-marking & products tag plate marking
Document review
Complete FAT IR report & Release report & Flash report etc.

Owner: Ning Xia WU Zhong


Position: Inspection engineer
Product: MANUNAL Valve
Supplier: XD line
Apr 2015-Jun 2016
Responsibility:
Expediting the raw material purchasing
Expediting the vendor documents submitting
Witness pressure test
PMI test
Witness anti-static test
Witness visual and dimension inspection
Painting inspection
Final inspection/protection and marking inspection
Packing inspection
Review RT&PT report
Review MTR

Date:2015.09-2016.09
Project:Wolong substation 500KVGIS
Client: State Grid Hubei Electric Power Company
Vendor:Xian XD Swithgear Electric Co., Ltd
Position: Inspector

Date:2014.07-2015.03
Project:Qixiang substation 500KVGIS
Client: State Grid Ninxia Electric Power Company
Vendor:ABB Electric control equipment Co., ltd.
Position: Inspector

Date:2014.07-2015.03
Project:Qixiang substation 500KVGIS
Client: State Grid Ninxia Electric Power Company
Vendor:ABB Electric control equipment Co., ltd.
Position: Inspector
Job Description:
Review raw material certificate, audit manufacturer’s quality system and sub-vendor,
Review calibration certification of manufacture’s equipment & gauge, review quality certificate and test reports.
Assembly inspection of circuit breaker, insulating, isolating switch, earthing switch, busbar, connecting cylinder,
elbows, bushing and etc
Inspection of visual inspection, control wiring check, SF6 gas leakage tests, SF6 gas pressure switch test,
Measurement of the resistance of the main circuit, Power frequency withstand voltage test, Dielectric test on

14
CERINS CO., LTD
B-905, Woolim Blue 9 Business Center,
583, Yangcheon-ro, Gangseo-gu, Seoul, Republic of Korea
Tel: +82 2 337 4611 / e-mail: kor@cerins.net
secondary circuit, Partial discharge test, Polarity check of CT, Pressure test of enclosure, CB test (Name-plate
check, Coil check, Operation test, Checking of anti-pump device, Timing test), DS/EC/FES test (Name-plate
check , Operation test , Timing test), CT test (Verification of terminal marking , Polarity test , Excitation
characteristics measurement) auxiliary electrical test.
Supervision of delivery test contains: open & close requirement, mechanical operation, Insulation resistance
contact resistance & power frequency voltage withstand test.
Witness install of short circuit connector, grounding wire, shells, pump the vacuum, actuating mechanism,
control circuit, Inspect dimension, nameplate, paint and marking.

Date: 2015.03—2015.08
Project:Zhejiang Xinjiang Akesu textile industrial city thermal power plant project /main transformer
(SFP-420000/220, 420MVA)
Client: Xinjiang zheneng Akesu Energy Development Co. Ltd.
Vendor: Xi’an XD Transformer Co., Ltd (XB)
Position: Inspector
Job Description:

Job DeTank manufacturing


Quality certificate materials list review,
Welding inspection, review WPS and PQR, check the welding consumables and welder personnel
Appearance inspection& Dimensional inspection
Tank test including gas leakage test, Mechanical Strength Test
Clamp manufacturing
Raw material check, sand blasting result check and visual and dimensional inspection
Tank shield manufacturing
Core assembly
Raw material check, Silicon steel shear, Fold assembly of iron core
Coil manufacturing
Winding manufacturing, Winding press and treatment, Coil assembly
Insulating part assembly
Active part assembly
Leading wire assembly
Dry of active part
General assembly
Core and coil inspection
Routine test
Winding resistance measurement
Winding Ratios Test Procedure
Connection group label test
Winding insulation resistance measurement
Winding dielectric loss and capacitance measurement
No Load Loss Test
Short circuit impedance and load loss measurement
Switching Impulse Test
9. Lightening Impulse Test
10. Separate Source Voltage Withstand Test
11. Long time induced voltage test
12. Dissolved gas analysis
13. On load tap changer test
14. Insulation oil test
15. Bushing current transformer test
t. Type test
1. Neutral full wave Lightening Impulse test
2. Lightning impact test at the end of line
3. Temperature rise test
U. Special test
1. ACSD
2. Long time overcurrent test
15
CERINS CO., LTD
B-905, Woolim Blue 9 Business Center,
583, Yangcheon-ro, Gangseo-gu, Seoul, Republic of Korea
Tel: +82 2 337 4611 / e-mail: kor@cerins.net
3. Sound level measurement
4. Zero impedance measurement
5. Radio interference measurement
6. Absorbing power measurement of Fan and motor
v. Measure winding frequency characteristics
w. Oil flow electrification test
x. Review Final Data Report
y. Preservation and Packing
z1. Marking
z2. Loading Inspection
z3. Shipping Document Control

scription:
Date: 2013.12—2014.7
Project:Ningxia Yellow River Substation Expansion Project/main transformer 750kV (ODFPS-700000/
750, 700/700/233)
Client: State Grid Ningxia Electric Power Company
Vendor: Xi’an XD Transformer Co., Ltd (XB)
Position: Inspector

Job Description:
Factory audit
Confirmed production environment management system
Confirmed quality management system
Review the raw material test report, certificate, including insulative material, silicon steel sheet, bushing,
switchgearetc.
Tank manufacturing
Quality certificate materials list review,
Welding inspection, review WPS and PQR, check the welding consumables and welder personnel
Appearance inspection& Dimensional inspection
Tank test including gas leakage test, Mechanical Strength Test
Clamp manufacturing
Raw material check, sand blasting result check and visual and dimensional inspection
Tank shield manufacturing
Core assembly
Raw material check, Silicon steel shear, Fold assembly of iron core
Coil manufacturing
Winding manufacturing, Winding press and treatment, Coil assembly
Insulating part assembly
Active part assembly
Leading wire assembly
Dry of active part
General assembly
Core and coil inspection
Routine test
Winding resistance measurement
Winding Ratios Test Procedure
Connection group label test
Winding insulation resistance measurement
Winding dielectric loss and capacitance measurement
No Load Loss Test
Short circuit impedance and load loss measurement
Switching Impulse Test
9. Lightening Impulse Test
10. Separate Source Voltage Withstand Test
11. Long time induced voltage test
16
CERINS CO., LTD
B-905, Woolim Blue 9 Business Center,
583, Yangcheon-ro, Gangseo-gu, Seoul, Republic of Korea
Tel: +82 2 337 4611 / e-mail: kor@cerins.net
12. Dissolved gas analysis
13. On load tap changer test
14. Insulation oil test
15. Bushing current transformer test
Type test
1. Neutral full wave Lightening Impulse test
2. Lightning impact test at the end of line
3. Temperature rise test
U. Special test
1. ACSD
2. Long time overcurrent test
3. Sound level measurement
4. Zero impedance measurement
5. Radio interference measurement
6. Absorbing power measurement of Fan and motor
v. Measure winding frequency characteristics
w. Oil flow electrification test
x. Review Final Data Report
y. Preservation and Packing
z1. Marking
z2. Loading Inspection
z3. Shipping Document Control

Date: 2012.9-2013.11
Vendor: Xi’an XD Transformer Co., Ltd (XB)
Item: Fancheng-500kV Shunt Reactors 3sets
Position: Inspector
Job Description:
Main raw material (Quality certificate materials list, Appearance inspection Dimensional inspection)
Main purchased parts- HV bushing, Neutral Bushing, Radiator, PRD, Valves, Gas relay, WTI, OTI, Terminal box.
Insulating part- coil paper board canister, Core limb ground shield
Tank and accessories manufacturing- Tank manufacturing, clamp manufacturing, Mounting barrel
manufacturing, Conservator manufacturing,
Coil manufacturing- Winding manufacturing, Winding press and treatment, Coil assembly
Core assembly- Silicon steel shear, Fold assembly of iron core,
Active part assembly
Leading wire assembly
Dry of active part
General assembly
Core and coil inspection
Reactor Test
Winding resistance measurement
Winding insulation resistance measurement
Winding dielectric loss and capacitance measurement
Impendence measurement
Loss measurement
Switching Impulse Test
Lightening Impulse Test
Neutral full wave Lightening Impulse Test
Separate source voltage withstand test
Induced AC voltage test
Frequency response characteristic analysis test
Insulation oil test
Vibration measurement
Excitation characteristic measurement
Zero impendence measurement
Current harmonics measurement
Acoustic sound level measurement
Absorbing power measurement of Fan and motor
17
CERINS CO., LTD
B-905, Woolim Blue 9 Business Center,
583, Yangcheon-ro, Gangseo-gu, Seoul, Republic of Korea
Tel: +82 2 337 4611 / e-mail: kor@cerins.net
Temperature rise test
Packing and delivery of product
Component and accessories checking
Accessories check and packing
Sealing and marking of packing box
Impact recorder installment

Time Period: 2012.1 - 2012.8


Name of Company: CNOOC
Position: piping & structure welding Inspector
Project: ICHTHYS
Location:Qingdao
Responsibilities:
Verify and perform material verification and ensure all material meet requirements.
Ensure all related drawings/document are properly kept for inspection use.
Monitor welder and welding operator qualification and monitor their performance.
Responsible for punch list raise and kill.
Responsible for issuing NCR and monitor the implementation of correction action and then NCR close-out.
Review and sign off inspection reports/records.
Ensure all QC reports/documents/records are kept properly and updated.
Attend weekly QC meeting with Contractor and Welders.
Record the inspection result and project status, issuing weekly and monthly inspection report to client.
Verified the pipe material using PMI, and report confirmed .
Valve install and flange control .

Time Period: Apr/2011 - Dec/2012


Name of Company: CNOOC
Position: structure& piping welding Inspector
Project:LS36-1 (Jacket and platform)
Location:Qingdao
Responsibilities:
Ensure implementation of the Contractor submitted Quality related procedures comply with applicable
specifications, standards and codes.
Ensure all related drawings/document are properly kept for inspection use.
Monitor welder and welding operator qualification and their performance.
Check the final dimension, visual and pre-erection.
Responsible for issuing NCR and monitor the close-out and implementation.
Ensure all QC reports/documents/records are kept properly and updated.
Attend weekly QC meeting with Contractor and Owner.
Record the inspection result and project status, issuing weekly and monthly inspection report to client.
Daily inspection for material receiving and traceability.
Check fit-up quality pre-welding, check dimension pre & post Welding and prepare inspection report.
Monitor welder and welding operator qualifications and their performance. Supervise WPS being carried out.
Inspect weld visual quality, and prepare the VI report.
Monitor PWHT and perform hardness test, and prepare PWHT report and Hardness Test Report.
Inspect blasting and painting quality. Record the inspection result and project status, issuing weekly and monthly
inspection report.

Time Period: Dec/2009 –Apr/2011


Name of Company: CNOOC
Position: structure& piping welding Inspector
Project: GORGON
Location:Qingdao
Responsibilities;
18
CERINS CO., LTD
B-905, Woolim Blue 9 Business Center,
583, Yangcheon-ro, Gangseo-gu, Seoul, Republic of Korea
Tel: +82 2 337 4611 / e-mail: kor@cerins.net
Ensure implementation of the Contractor submitted Quality related procedures comply with applicable
specifications, standards and codes.
Witness WPQ test, such as witness site welding, specimens’ preparation, mechanical test (tensile test and
Charpy-V impact test), hardness test and macro test.
Witness welder test and approve the welder certificates.
Verify and perform material verification and ensure all material meet the requirements, witness the specimens’
selection, mechanical test, and chemical composition test.
Ensure all related draw
spections such as material receiving, traceability, cut profile, fit up, dimension and visual inspection according to
ITP.
Monitor welder and welding operator qualification and their performance.
Monitor PWHT and perform hardness test.
Perform line check, flushing inspection, pressure test inspection and reinstatement inspection according to ISO
drawing, P&I D and test package.
Responsible for punch list raise and kill.
Responsible for issuing NCR and monitor the implementation of correction action and then NCR close-out.