Professional Documents
Culture Documents
TAHUN 2021
Pada hari ini Senin tanggal Enam Belas bulan Agustus tahun Dua Ribu Dua Puluh Satu (16-08-2021), menunjuk Perjanjian Kerjasama Nomor : 007.PJ/HKM.00.01/PUSMANPRO/2019 Tentang : Pengadaan Jasa Konsultansi Tenaga Ahli Quality Control Proyek PLTU
Sulsel Barru 2, maka sesuai dengan Biodata Calon Tenaga Ahli yang disampaikan PT. Sucofindo (Persero) Cabang Jakarta, bersama ini disampaikan hasil verifikasi kualifikasi calon Tenaga Ahli sebagai berikut:
KOE BULAN
BULAN
NO PERUSAHAAN JABATAN/POSISI JOBDESK LOKASI AWAL AKHIR FISIE PENGALAMAN X KETERANGAN
PENGALAMAN
N KOEFISIEN
Equipment:
Switchgear MVE-1200-610, Exciter-Rotor, Cabinet MV side 7,2 kV
Responsible FAT Switchgear MVE-1200-610, Exciter-Rotor, Cabinet MV
side 7,2 kV
TUV Rheinland STEP Insternational GmbH, • Low voltage motor test
1 Technical Inspector Germany 1/31/2016 8/1/2021 67.00 0 0.0 CV
Germany • cable connections
• power circuit as per electrical drawing, including terminations etc,
• Check all control connections,
• Isolator / earthing switch mechanism
• Final Check
Equipment:
Technical Inspector
Solar Panel of SMA Technology AG, Inverter SC 2200 & MV Block (70
MWp Kogoshima Photovoltaic Power Plant and 75 MWp Kalkbut
Photovoltaic Power Plant)
Responsible FAT Solar Panel, Inverter SC 2200 & MV Block
KSI Worldwide Quality Services GmbH,
2 Technical Inspector • Checking of supply voltages and control level Germany 7/31/2012 1/1/2016 42.00 0 0.0 CV
Germany • Insulation resistance test
• Efficiency max Test
• Burn-in test
• Push emergengy button test
• THDv and THDi
National certification for products bound for middle eastern countries.
Equipment:
3 GL Germany Technical Inspector SPX Flow Technology Norderstedt GmbH, Metering Pump Germany 4/30/2012 7/1/2012 3.00 1 3.0 CV
FAT and Final Inspection
Equipment: posco HARTMANN VALVES GmbH
4 TÜV Nord INCOK Technical Inspector Germany 11/30/2011 4/1/2012 5.00 1 5.0 CV
FAT of Manual Severe Ball Valve, Power Plant Ball Valves
Equipment: Voith Turbo BHS Gertriebe GmbH/BHS Gear Box
5 PERMALIT, Austria Technical Inspector Austria 1/31/2011 11/1/2011 10.00 1 10.0 CV
FAT and Final of Gear Box
Equipment ; MV GIS Switchgear panels Type ZX2
Responsible FAT MV GIS Switchgear panels Type ZX2
• Testing of the dielectical strength of the panel (testing voltage
ABB AG Calor EMAG Oberhausen Strasse
6 Technical Inspector according product card) Germany 1/31/2010 1/1/2011 12.00 0 0.0 CV
33, 40472 RatingenGermany
• Measuring of the partial discharge according to the specification.
• Testing of the isolation distances of the disconnector switch (open
position of switches).
Equipment ; KSB, Centrifugal pump // TBCR-PO-MEC-012
7 IIS Indian Inspection Services Technical Inspector India 6/30/2009 12/31/2010 19.00 1 19.0 CV
FAT and Final of centrifugal pumps
1
BERITA ACARA VERIFIKASI KUALIFIKASI CALON TENAGA AHLI
TAHUN 2021
Pada hari ini Senin tanggal Enam Belas bulan Agustus tahun Dua Ribu Dua Puluh Satu (16-08-2021), menunjuk Perjanjian Kerjasama Nomor : 007.PJ/HKM.00.01/PUSMANPRO/2019 Tentang : Pengadaan Jasa Konsultansi Tenaga Ahli Quality Control Proyek PLTU
Sulsel Barru 2, maka sesuai dengan Biodata Calon Tenaga Ahli yang disampaikan PT. Sucofindo (Persero) Cabang Jakarta, bersama ini disampaikan hasil verifikasi kualifikasi calon Tenaga Ahli sebagai berikut:
Demikian Berita Acara Verifikasi Kualifikasi Calon ini dibuat dan disepakati untuk dipergunakan sebagaimana mestinya.
PT PLN (PERSERO) PUSAT MANAJEMEN PROYEK
DIREKSI PEKERJAAN 1 DARU HANDOYO 1. ..................................
ANGGOTA 2 HADIANSYAH KAUSAR 2. ......................................
ANGGOTA 3 M. BAHRUN IDRIS 3. ..................................
ANGGOTA 4 FEBRIYANTO 4. ......................................