METHOD OF STATEMENT
FOR OVECURRENT & E/F
PROTECTION
AURA ENGINEERING LLC

CONTENTS

DESCRIPTION PAGE NO.

1.0 Purpose 03

2.0 Scope 03

3.0 References 03

4.0 Manpower 03

5.0 Procedure 03

6.0 OCEF Relay testing 03

7.0 Safety Precautions and Measures 05

8.0 Responsibilities 05

9.0 Emergency 06

10.0 Records 06

2|Page
METHOD OF STATEMENT
FOR OVECURRENT & E/F
PROTECTION
AURA ENGINEERING LLC

1.0 Purpose
This method statement will give a brief step to be carried out for testing and commissioning
of OCEF relays.
2.0 Scope
This procedure describes the method to be adopted for:
 Testing of over current earth fault relays
3.0 Reference
 Approved schematic drawing
 Project HSE Plan
 Project Quality Plan
 Tender Specification
4.0 Man power
a) Project Engineer (permit holder) - 01
b) Testing Engineer (DCRP) - 01
c) HSE Officer - 01
d) Technician - 01
5.0 Procedure
 Ensure that all reference documents are available at site.
 Ensure that valid permits are obtained from concerned authorities wherever
applicable.
 Ensure only trained persons shall operate the power tools.
 Ensure all concerned personals shall use PPE and all other items are required.
 Ensure adequate lighting is provided in the working area at night time.
 Ensure service area/work area openings are provided with barricade, tape and safety
nets.
6.0 Over current & E/F protection:
 The approved settings are uploaded in the relay.
 The output relays and opto inputs are configured as per scheme diagram.
 The logic and LEDs are configured as per scheme requirement.
Measurements:
 The voltage & current connections are made from the kit to test plug of the relay.
 The kit is switched ON.
3|Page
METHOD OF STATEMENT
FOR OVECURRENT & E/F
PROTECTION
AURA ENGINEERING LLC

 Quick CMC module is opened.

The 3ɸ voltages and current are injected as given below:


 VR - 63.5V ∟0⁰ IR - 1A ∟0⁰
 VY - 63.5V ∟-120⁰ IY - 1A ∟-120⁰
 VB - 63.5V ∟+120⁰ IB - 1A ∟+120⁰
 The voltage and current readings are taken from the measurements menu and
compared with CT & VT ratio adopted.
Over current pick up:
 The E/F fault function is disabled in the relay OMICRON kit is switched ON.
 Quick CMC module is opened.
 Slowly rise Rɸ current till the relay O/C function pickup.
 Note the reading.
 Similarly Yɸ & Bɸ pickup values are noted.
 Inject 2 times current and note the relay trip time.
 Inject 5 times current and note the relay trip time.
Earth fault Pick up:
 Enable Earth fault function in the relay.
 Switch ON OMICRON kit.
 Open quick CMC module.
 Rise Rɸ current till E/F picks up.
 Note the readings.
 Inject 2 times current.
 Note the relay trip time.
 Inject 5 times current.
 Note the relay trip time.

4|Page
METHOD OF STATEMENT
FOR OVECURRENT & E/F
PROTECTION
AURA ENGINEERING LLC

7.0 Safety Precautions and Measures


7.1 Control Measures
 Calibration/fitness certificates shall be provided for all equipment to be used for the
testing work.
 HSE officer will ensure all the labour/Site staff shall be wearing proper PPE inside
site.
 All worker/Site staff/visitors shall be allowed only after wearing appropriate PPE in
the site.
 No work shall be carried out night without prior approval of Owner/Engineer.
7.2Safety Provision
The following safety and precautionary measures will be taken prior to start of the
activity.
 Tool box talk shall be conducted and all workers who shall be involved in the
transformer testing works shall be well oriented to the nature of work.
 Ensure the work force deployed for these activities are having adequate skill and
undergone required HSE training.
 Ensure required LOA/PTW is available at site before starting the job.
 All equipment’s, tools & tackles shall be checked by HSEA before starting the job.
 Segregated access for equipment and workers shall be provided.
 Ensure enough drinking water is available at work site.
 Ensure work crew is provided with adequate transportation facilities.
 Ensure all employees are clear about their job, tasks and hazards involved.
 Ensure all the testing kits and tools to be used are in good working condition.
8.0 Responsibilities
 Project Manager is over all responsible for Safety, Quality and Progress of the
Project.
 Safety Engineer Will Monitor all works are being carried out in accordance with
the safety requirements on site.

5|Page
METHOD OF STATEMENT
FOR OVECURRENT & E/F
PROTECTION
AURA ENGINEERING LLC

 Testing Engineer shall be responsible for the site testing activities and
implementation of all testing plans.

9.0 Emergency
In case of Emergency,
 Stop the work.
 Alert the nearby workers to reach to the nearest assembly point
 Do not to get panic and do not run.
 Inform the site HSE officer and other key personnel from the emergency contacts
numbers displayed in the site.
 Call emergency services (9999) if required.
 Supervisor shall make head count and report.
10.0 Records
 SAT(Site acceptance test) reports
 Quality Records
 Inspection forms