You are on page 1of 4

MAESTRO OIL & GAS SOLUTIONS

PROJECT: LPG RECEIPT, STORAGE & DISPATCH AND


BOTTLING FACILITY AT TANZANIA
IOT DESIGN & ENGINEERING LTD.

REV.: O1
INSTRUMENT PROCESS DATASHEET FOR RESTRICTION
ORIFICE ISSUE DATE : 09/05/2012
DISCIPLINE : PROCESS

DOC NO. : 11C1A34-01-DS-RO-031 SHEET NO : 2 OF 4

1 TAG NO. 03-RO-1401 03-RO-1501 03-RO-1701


2 SERVICE INSTRUMENT AIR INSTRUMENT AIR INSTRUMENT AIR
3 LOCATION 15-AI-1467-J3A 15-AI-1532-J3A 15-AI-1702-J3A
4 FLUID AIR AIR AIR
5 FLUID STATE GAS GAS GAS
6 OPERATING CONDITIONS
7 TEMPERATURE, OC 45 45 45
8 PRESSURE AT INLET, kg/cm 2g 4 4 4
9 FLOW RATE @ P&T
10 NORMAL, kg/hr
11 MINIMUM, kg/hr
12 MAXIMUM, kg/hr 146 146 146
13 ELEMENT PRESSURE DROP, kg/cm 2 1 1 1
14 LIQUID PROPERTIES @ P&T
15 DENSITY, kg/m3
16 VISCOSITY CP
17 GAS & VAPOUR PROPERTIES @ P&T
18 MOLECULAR WEIGHT 29 29 29
19 COMPRESSIBILITY FACTOR 1 1 1
20 VISCOSITY CP 0.02 0.02 0.02
21 CP/CV 1.41 1.14 1.41
22 TYPE OF FLOWMETER
23 CORROSIVE CONSTITUENTS
24 VAC POSSIBILITY
25 DESIGN CONDITIONS
26 DESIGN TEMPERATURE, OC 65 65 65
27 DESIGN PRESSURE, kg/cm 2g 10.5 10.5 10.5
28 ALARM SET POINT VALUES
29 LOW
30 HIGH
31 LOW LOW
32 HIGH HIGH
33 NOTE NO.

NOTES:

O1 ISSUED FOR COMMENT DD AB PB 9/5/2012


REV DESCRIPTION PREPARED CHECKED APPROVED DATE

This document is the property of M/s. IOTDE and must not be copied, used reproduced without written permission from M/s IOTDE.
MAESTRO OIL & GAS SOLUTIONS

PROJECT: LPG RECEIPT, STORAGE & DISPATCH AND


BOTTLING FACILITY AT TANZANIA
IOT DESIGN & ENGINEERING LTD.

REV.: O1
INSTRUMENT PROCESS DATASHEET FOR RESTRICTION
ORIFICE ISSUE DATE : 09/05/2012
DISCIPLINE : PROCESS

DOC NO. : 11C1A34-01-DS-RO-031 SHEET NO : 3 OF 4

1 TAG NO. 03-RO-1702 03-RO-1703 03-RO-1704


2 SERVICE INSTRUMENT AIR INSTRUMENT AIR INSTRUMENT AIR
3 LOCATION 15-AI-1703-J3A 15-AI-1704-J3A 15-AI-1705-J3A
4 FLUID AIR AIR AIR
5 FLUID STATE GAS GAS GAS
6 OPERATING CONDITIONS
7 TEMPERATURE, OC 45 45 45
8 PRESSURE AT INLET, kg/cm 2g 4 4 4
9 FLOW RATE @ P&T
10 NORMAL, kg/hr
11 MINIMUM, kg/hr
12 MAXIMUM, kg/hr 146 146 146
13 ELEMENT PRESSURE DROP, kg/cm 2 1 1 1
14 LIQUID PROPERTIES @ P&T
15 DENSITY, kg/m3
16 VISCOSITY CP
17 GAS & VAPOUR PROPERTIES @ P&T
18 MOLECULAR WEIGHT 29 29 29
19 COMPRESSIBILITY FACTOR 1 1 1
20 VISCOSITY CP 0.02 0.02 0.02
21 CP/CV 1.41 1.14 1.41
22 TYPE OF FLOWMETER
23 CORROSIVE CONSTITUENTS
24 VAC POSSIBILITY
25 DESIGN CONDITIONS
26 DESIGN TEMPERATURE, OC 65 65 65
27 DESIGN PRESSURE, kg/cm 2g 10.5 10.5 10.5
28 ALARM SET POINT VALUES
29 LOW
30 HIGH
31 LOW LOW
32 HIGH HIGH
33 NOTE NO.

NOTES:

O1 ISSUED FOR COMMENT DD AB PB 9/5/2012


REV DESCRIPTION PREPARED CHECKED APPROVED DATE

This document is the property of M/s. IOTDE and must not be copied, used reproduced without written permission from M/s IOTDE.
MAESTRO OIL & GAS SOLUTIONS

PROJECT: LPG RECEIPT, STORAGE & DISPATCH AND


BOTTLING FACILITY AT TANZANIA
IOT DESIGN & ENGINEERING LTD.

REV.: O1
INSTRUMENT PROCESS DATASHEET FOR RESTRICTION
ORIFICE ISSUE DATE : 09/05/2012
DISCIPLINE : PROCESS

DOC NO. : 11C1A34-01-DS-RO-031 SHEET NO : 4 OF 4

1 TAG NO. 03-RO-2002


2 SERVICE INSTRUMENT AIR
3 LOCATION 15-AI-2042-J3A
4 FLUID AIR
5 FLUID STATE GAS
6 OPERATING CONDITIONS
O
7 TEMPERATURE, C 45
8 PRESSURE AT INLET, kg/cm 2g 4
9 FLOW RATE @ P&T
10 NORMAL, kg/hr
11 MINIMUM, kg/hr
12 MAXIMUM, kg/hr 146
2
13 ELEMENT PRESSURE DROP, kg/cm 1
14 LIQUID PROPERTIES @ P&T
15 DENSITY, kg/m3
16 VISCOSITY CP
17 GAS & VAPOUR PROPERTIES @ P&T
18 MOLECULAR WEIGHT 29
19 COMPRESSIBILITY FACTOR 1
20 VISCOSITY CP 0.02
21 CP/CV 1.41
22 TYPE OF FLOWMETER
23 CORROSIVE CONSTITUENTS
24 VAC POSSIBILITY
25 DESIGN CONDITIONS
26 DESIGN TEMPERATURE, OC 65
2
27 DESIGN PRESSURE, kg/cm g 10.5
28 ALARM SET POINT VALUES
29 LOW
30 HIGH
31 LOW LOW
32 HIGH HIGH
33 NOTE NO.

NOTES:

O1 ISSUED FOR COMMENT DD AB PB 9/5/2012


REV DESCRIPTION PREPARED CHECKED APPROVED DATE

This document is the property of M/s. IOTDE and must not be copied, used reproduced without written permission from M/s IOTDE.