K E Y C O N TAC T S :
SITE DESCRIPTION
In June of 2018, the Massachusetts Department of Environmental Protection (MassDEP) Z A N E T TA P U R N E L L
responded to a neighbor’s complaint regarding an excessive volume of dust generated U.S. EPA Community Involvement
from the Healy School building demolition. MassDEP inspected the Site following the Coordinator
demolition activities, observed the demolition activities and collected debris samples 617-918-1306
which indicated elevated levels of asbestos and metals. purnell.zanetta@epa.gov
E PA’ S I N V O LV E M E N T L E A R N M O R E AT:
EPA has been involved with the Site since MassDEP’s referral in February of 2019. response.epa.gov/
formerhealyschool
continued >>
October 2019
NEXT S TEPS/WHAT TO EXPECT
EPA’s goal for community involvement and segregation of hazardous waste free could become airborne during cleanup
is to provide the public with accurate, debris; repairing all response-related activities. If monitors detect airborne
timely, accessible, and understandable damage; and demobilization from Site. contamination, all work will be stopped,
information about the project as it and actions taken to evaluate and
moves forward. EPA and its contractors will begin address the issue. One may expect to see
mobilizing to the Site the week of heavy equipment, workers in protective
The Removal Action activities that will October 20th, 2019. EPA will generally clothing (i.e., white suits), and trucks
be performed include: mobilization of work from 7am to 5pm. The Removal occasionally which may have a slight
personnel and equipment; performing Action is expected to take 3 to 6 effect on traffic. EPA will coordinate with
air monitoring during working hours; months. Throughout the work day, EPA the City of Fall River to determine the
removing and disposing of building will be monitoring air and dust at the most appropriate route for truck traffic.
debris contaminated with metals and or Site for the safety of site workers and Contaminated soil will be secured on
asbestos; provisions for demolition of the the surrounding community. Monitoring site temporarily while awaiting shipment
interior standing portions of the building, stations setup at the site are purposed offsite to an EPA-approved facility.
onsite decontamination of larger debris, to measure particulate material that