5

A B C D E F

12.70 F
1.00 11.70 1.00

A
1.00

1.00
1 TOP OF BEAM

STEP DN
16 3 GRND FIN. CEI. LN.
15

4.00
PRE-PAINTED GUTTER
PRE-PAINTED GUTTER 14
13 121 " Ø B.I. PIPE HANDRAIL
ASPHALT SHINGLE RIDGE CAP 112 " Ø B.I. PIPE HANDRAIL & 12 (VERIFY COLOR TO ARCHITECT)
16MM Ø ROUND BAR (PLAIN)
2 GUARDRAILS (VERIFY COLOR
11
11.20

11.20
9.20

TO ARCHITECT) 10 16MM Ø ROUND BAR (PLAIN)


3

W-1
50MM THK. SOLID WOOD TREAD 9 4 GUARDRAILS (VERIFY COLOR
TO ARCHITECT)
IN DUCO PAINT FINISH 8 16 2ND FIN. FL. LN.
(VERIFY COLOR TO ARCHITECT)
15

5.00
7
4 14
6 13 GRND FIN. CEI. LN.
CONCRETE BEAM 12
5 11
10
4 9
3 8
5 2 7

1.20
6.60
1.00

1 6
5
6 CONCRETE STRINGER
5 50MM THK. SOLID WOOD TREAD
4
3
FLASHING
IN DUCO PAINT FINISH
(VERIFY COLOR TO ARCHITECT)
SUNKEN GUTTER ASPHALT ROOF SHINGLES PLAN GRND. FIN. FL. LN.

7
4.50

SECTION THRU "A"

A3 SCALE A3 SCALE
ROOF PLAN 1 1: 100 MTS STAIR DETAIL 2 1: 50 MTS

APEX LINE OF ROOF APEX LINE OF ROOF


2.00

2.00

2.00

2.00
CONCRETE KEYSTONE
SEE TRUSS DETAIL SEE TRUSS DETAIL
10MMTHK TEMPERED GLASS
TOP OF BEAM SHOWER ENCLOSURE TOP OF BEAM
2ND FIN. CEI. LN. W-5 W-8 W-5 2ND FIN. CEI. LN.
30X30CM MOSAIC W-1 20X20CM CERAMIC
WALL TILES WALL TILES
3.00

3.00

3.00

3.00

3.00
2.70

2.70
2.70

2.70
10MMTHK TEMPERED GLASS
20X20CM CERAMIC
SHOWER ENCLOSURE FALSE COLUMN
8.70

8.70
8.75

TOILET & BATH FALSE COLUMN (BORDER) WALL TILES MASTER'S T&B GUEST BEDROOM T&B WORKING
30X30CM MASAIC 16 2ND FIN. FL. LN. SPACE 2ND FIN. FL. LN.
4.00

(BASE) WALL TILES 15


14
13
12 GRND FIN. CEI. LN. W-7
W-4 GRND FIN. CEI. LN.
11
10
9
3.00

50MM GROOVE LINE

1.80
8
2.60
3.40

3.40
7
3.00

3.00

3.00
SPACED @ 0.80M BW
2.85

2.85
6

2.70
D 5 W-7
2 4
LIVING AREA 3 30X30CM CERAMIC WALL TILES
0.75

2
DINING AREA 1
BACKSPLASH DIRTY KITCHEN KITCHEN DINING AREA LANAI DECO STONE CLADDING

1.00
GRND. FIN. FL. LN. GRND. FIN. FL. LN.
0.75

-0.05mts

112 " Ø B.I. PIPE HANDRAIL NATURAL GROUND LINE


STREET LINE

16MM Ø ROUND BAR (PLAIN) GUARDRAILS GRAPHICOTE BACKSPLASH

A3 SCALE A3 SCALE
LONGITUDINAL SECTION THRU "A" 3 1: 100 MTS CROSS SECTION THRU "B" 4 1: 100 MTS
Designer: Architect: R.A. 9266, Art 3, Sec 20 Professional Electrical Engineer: Project Title: Checked by: Approved by: Revisions: Sheet Contents: Sheet no:
Drawings and Specifications duly signed, stamped or
AR. RODOLFO A. NIDOY II, UAP, RMP sealed, as instruments of service, are the intellectual A3
SED PROBUILD CONCEPTS INC. Registered Architect properties and documents of the ARCHITECT, wether the ROOF PLAN
INTERIORS | ARCHITECTURE | CONSTRUCTION
object for which they are made is executed or not. It shall Civil Engineer MR. WILLEM KLERK & MRS. NOR-AIN KLERK STAIR DETAIL
D:\RHEAN\MACAPILI RESIDENCE\CAD\sed new logo.jpg
D:\SED RHEAN\MACAPILI RESIDENCE\WORKING DRAWINGS FOR APPROVAL REVISION\sed new logo.jpg
PRC No.: 33939 Validity: 10-12-2020
be unlawful for any person, without the consent of the PROPOSED TWO (2) STOREY RESIDENCE Drawn/ Cadd by:
Owner/ Client/ Authorized Person LONGITUDINAL SECTION THRU "A"
Project no:
NO. 22 KATIPUNAN, WHITEPLAINS, IAPOA No.: 29378 O.R No: 204927 Date: 070218 architect, or author of said documents for use in the PRC No.: Validity:
QUEZON CITY, PHILIPPINES
CROSS SECTION THRU "B"
PTR No.: 7348891 Date Issued: 01-07-2018 repetition of and for other project or buildings, whether PTR No.: Date Issued: ARCHRAN & MJLBP Address: LOT 12 BLOCK 23 RHONE COR. ORLEANS ST.,