Project Title: Extension of
220kV & 33kV GIS and addition Document/Drawing Approval
of Third Power Transformer at Routing Slip among TRANSCO
220/34.5kV AL Foah Grid Engineers
Station and all related
modifications works
Total Accumulated
Date of Delay in
1st Delay in
Previous Resubmission of the
Submission Resubmission of
Revision previous Revision
the DTS versions
2)
Date
Date DTS Initial Final
E&C/ Discipline Name DTS Comments
Received Signature Signature
Cleared
( ) Civil Yes No
( ) MEP Yes No
( ) Protection and
Control
Yes No
( ) Plant Yes No
( ) OHL/Cables Yes No
( ) Telecom/
FOC
Yes No
( ) SCADA/
Metering
Yes No
4)
Date DTS Received
Designation Name Date DTS Cleared Signature
back
Mr. Engr. Faraj Mubarak
Project Manager
Hamad
5) To be filled by the project Manager
Deviation Form Project Manager
AP NA Date Remarks
Required Signature
Yes No
REVISIONS
CLIENT:
SNC-LAVALIN
Abu Dhabi Mall -Trade Center Building
2nd Floor, East Tower
P. O. Box 109247, Abu Dhabi-UAE
PROJECT TITLE: 220/33KV -EXTENSION OF GIS & ADDITION OF THIRD POWER TRANSFORMER IN AL
FOAH GRID - SUBSTATION
CONTENTS
1. Activity
2. Description of work
3. Terminology
4. Significant hazards identified
5. Roles & responsibility
6. Sequence of activities
7. Requirements
7.1. Plans /records and job instructions (documentations)
7.2. Trainings
7.3. On site risk assessment
7.4. PPE (personal protective equipment)
7.5. Equipment and tools required
7.6. Additional requirements
MS for 220KV OHL Feeder (D09, D10 & D04,D06) BCPU Replacement
& associated Modification, Testing & commissioning works
1) Activity:
BCU Replacement and associated Modification & Pre-commissioning checks
2) Description of Work
Purpose:
As per Contract No: N12628.1, 220/33kV GIS Bay Extension and Addition of Third Power Transformer at
Al Foah Grid Substation-Alain.
SCOPE:
· Remove the Existing BCU and Hand over to Transco stores through Transco Handing
over Procedure.
· Installation, Testing and commissioning of New BCU’s in (D09,D10 & D04,D06) LCC
Panels.
· Installation, Testing and commissioning of New 7VE61(applicable only for =D09/D10)
· Related Wiring Modifications in LCC Panels.
· Establish the Communication with SCMS via IEC 61850 and Testing of all the signals.
· Additional control cables laying, glanding, dressing, termination, marking etc.,
· All the modifications will be done as per the approved drawings.
· Electric Shock.
· Paint Spilling
5.1 · Obtain PTW for LCC Panel D05 / D08 – Power Action BY
Transformer Feeders. Competent Person
MS for 220KV OHL Feeder (D09, D10 & D04,D06) BCPU Replacement
& associated Modification, Testing & commissioning works
§ Site In-Charge
o Convey the message to all concerns
o Ensuring the relevant documents and resources.
§ Engineer
o Ensure workers on site are not exposed to danger when working on or near live electrical
systems and equipment.
o Ensuring the controls at work spots in person.
o Verifying the % compliance as per risk assessment.
o Ensuring the emergency preparedness.
o Ensures availability of the necessary resources.
o Ensuring un-authorized Entry
o Placing warning tapes and warning boards in the work environment.
o Placing Fire Extinguisher at test place.
o Arranging all needed test equipments.
§ Workmen
o Wearing appropriate PPEs.
o Understanding and following the instructions given by line staff.
o No horseplay and shortcuts.
· Safety Officer
o Assisting the line staffs for managing HSE efficiently.
o Ensuring the compliance of Legal / Owner / Engineer requirements.
6) Sequence of Activities
· Avail Safety Documents for the work to be carried out.
· Work area must be clearly identified by Red & White Tap.
· Permit shall be pasted on front and backside of the panel under outage.
· Before start of work, toolbox talk to be conducted to the Working party.
· Necessary PPE (Helmet, Safety shoes, highly visible jacket) must be warm.
· Replace the Old BCU with New One.
· Install MCB & Contactor in the LCC Panel.
· Wiring modification as per the Approved Drawings.
· Connect the all the termination as per the Drawings.
· After completion of all works. Men & Martials remove from over arena.
· Call authorizes person for cancelling the Permit.
· Cancel the safety Documents
MS for 220KV OHL Feeder (D09, D10 & D04,D06) BCPU Replacement
& associated Modification, Testing & commissioning works
Isolation Method Statement
Permit shall be pasted on front and backside of the panel under outage and the related panels as per the
below table;
=D09 / D10+S1
1. 220kV LCC Panel
=D04 / D06+S1
After completion of necessary Trip terminal/Link isolation, identify and isolate the panel DC supply by removing
respective terminals OR switching off MCBS and confirm there is no voltage.
MS for 220KV OHL Feeder (D09, D10 & D04,D06) BCPU Replacement
& associated Modification, Testing & commissioning works
WARNING
Expected measure voltage +VE & -VE volt with respect to ground after isolation at the below mentioned point is
zero in case of any voltage observed, work must be stopped
LCC Panel:
Existing
Sr. No Panel MCB/tb ref. Purpose Remarks
Drawing
AFTER COMPLETION OF NECESSARY DC ISOLATION, THE DC WIRES TO BE ISOLATED FROM MAIN-1PPROTN RELAY
WARNING: REMOVAL OF WIRING MUST BE TAKEN OUT ONE BY ONE AND INSULATED WITH INSULATION TAPE PRIOR
TO REMOVAL OF NEXT WIRE. CHECK ZERO POTENTIAL AFTER ISOLATION.
After isolation of DC MCBs/TERMINALS/links and wiring in Main-1 relay DC non availability shall be ensured.
C.3.4 Isolation of CT/VT CIRCUITS
After completion of DC isolation & DC VOLTAGE VERIFICATION at BCU, the CT and VT circuit shall be isolated
and masked only at LCC panel side as per below. Accordingly, the following table shall be filled for isolation and
masking of VT and CT circuits.
WARNING: Removal of wiring at external side and must be taken out one by one and insulated with
insulation tape prior to removal of next wire. check zero potential after isolating at both sides.
1. Dismantling of Equipment:
Once all the isolation as mentioned above is done, then list down the components which are to be dismantled as a part of
this modification scope. Removed components shall be properly packed with details of the component on the packing and
handed over to Transco Store.
Before starting the dismantling, must confirm the existing schematic for correctness. Necessary precautions shall be taken as not
to disturb other live cables.
· Remove all wirings from existing BCU (A211) Relay without disturbing ferrules.
MS for 220KV OHL Feeder (D09, D10 & D04,D06) BCPU Replacement
& associated Modification, Testing & commissioning works
· Remove BCU relay from (D09 / D10/D04/D06) + S1 PANEL & keep it safely with proper notice & this will be
handover to Transco stores as per Transco Handing over procedure
· Install the new BCU relay (6MD66) in = (D09 / D10/D04/D06) panel in place of old BCU Relay.
· Reconnect the existing wiring (No wiring changes wire will be reconnected to new Relay)
· Removing the Mimic Bottom Plate for fixing new Split synchro relay(-A250)- applicable for D09/D10
· Required cutout will prepared at site stores with proper power tools- applicable for D09/D10
· Install the new 7VE61 (A250) as per the below diagram (Front View Door) applicable for D09/D10.
· Install additional Contactor in D09 / D10 + S1 LCC panel as per the Drawings in the mentioned location.
MS for 220KV OHL Feeder (D09, D10 & D04,D06) BCPU Replacement
& associated Modification, Testing & commissioning works
· Do the necessary wiring for the Contactors as per the Drawings.
· Install the additional MCBs in the LCC Panel as per the Drawings for Fdr(=D09/D10)
· Install the additional MCBs in the LCC Panel as per the Drawings for Fdr(=D04/D06)
MS for 220KV OHL Feeder (D09, D10 & D04,D06) BCPU Replacement
& associated Modification, Testing & commissioning works
LCC Panel:
Existing
Sr. No Panel MCB Ref. Purpose remarks
Drawing
Note: SAT Protocol will be submitted separately the above Pre-commissioning works
B) Restoration Procedure:
After completion of all above mentioned activities, the Feeder will be ready for Restoration.
a) After completion of all the activities CT/VT circuit should be normalized.
b) After completion of all the activities un-masking to be carried out on all the related areas.
c) Removal of Barrication.
d) Final Checks
· After completion of all modification and testing works, cleaning has to be carried out
in and around the panels.
· Ensure the tightness of the modified circuit terminals and CT/VT Circuits.
· Ensure no alarm persisting in the LCC Annunciator/BCU/SCMS and the same needs
to be confirmed with LDC.
· Keep the Red mark up drawings for the particular feeders available at site.
MS for 220KV OHL Feeder (D09, D10 & D04,D06) BCPU Replacement
& associated Modification, Testing & commissioning works
· All the warning tape and Permit copy shall be removed.
· After satisfactory completion of final checks. LDC & Authorized Person Shall be
Informed about the Completion of Modification work and the Work Permit shall be
Cleared with Authorized Person.
8) Requirements
7.1 Plan, records and job instruction(documents)
7.2 Training
· Electrical Safety.
· Risk assessment shall be reviewed site specifically prior to work starts to ensure
the existing controls are adequate.
7.4 PPEs
Equipment / tools
§ Digital Multimeter
§ Wires, lugs and ferrules
§ Insulated Hand Tools.
§ Hydraulic Cutting tools
· First aid facilities with trained first aider and fire fighter shall be made available.
9) HSE & SAFETY PRECATIONS:
· Ensure all the employees and workmen have put on their PPEs at site.
· Put CO2 system is in manual mode before entering into GIS/Control rooms.
MS for 220KV OHL Feeder (D09, D10 & D04,D06) BCPU Replacement
& associated Modification, Testing & commissioning works
· Instruct all technicians on the correct and safe way of handling various types of materials.
· Explain to the workmen the hazards to be faced while carrying out the job and the control measures to
be followed.
Ø In case of fire
· Follow Transco’s approved emergency procedure as per HSE Plan.
11) References
12) Attachments:
MS for 220KV OHL Feeder (D09, D10 & D04,D06) BCPU Replacement
& associated Modification, Testing & commissioning works
RISK ASSESSMENT
Project: N-12628.1 220/33kV AL FOAH GRID SUBSTATION
D09 / D10 + S1 – LCC Modification and associated works
Type of Type Of
Sl.No Identified Risks Control Measures Remarks
protection risk
1) Un identification of the feeder a) Identification of the Feeder =D09 / D10 + S1 LCC Panel
Probability
1 2 3 4 5
Severity People Assets Environment Reputation Unlikely Remote Likely Probable Frequent
Multiple fatalities
Extensive International
5. Catastrophic or permanent total
disabilities
damage
Massive effect
impact 5 10 15 20 25
single fatality or
4. Severe permanent total
disability
Major damage Major effect National impact 4 8 12 16 20
Major injury or Considerable
3. Critical health effects
Local damage Localized effect
impact 3 6 9 12 15
Minor injury or
2. Marginal health effects
Minor damage Minor effect Minor impact 2 4 6 8 10
slight injury or
1. Negligible health effects
Slight damage Slight effect Slight impact 1 2 3 4 5
(Unacceptable high)
This level of risk exposes the Company to intolerable losses to people, assets, environment or reputation.
10-25 High Risk
The hazard should be eliminated or its risk reduced to tolerable levels immediately. Action must be taken
immediately to lower the risk.
(Acceptable but must be managed at ALARP)
4-9 Medium Risk (ALARP) The hazards must be managed to reduce the frequency and/or the severity of the hazardous events to
ALARP. Risk reduction measures must be planned and documented.
ALARP: Means to reduce a risk to a level which is “as low as reasonably practicable” and involves balancing reduction in risk against the time, trouble,
difficulty and cost of achieving it.
Likelihood Definitions:
Likely Frequency
Descriptor Probability
Environment Health and Safety
Frequent Continues or will happen Frequently Occurs several times a year at location 5
Probable 5- 12 times per year Occurs several times a year in similar industries in UAE 4
Likely 1-5 times per year Has occurred at least once in UAE 3
Remote Once every 5 years Has occurred in industry (world wide) 2
Unlikely Less than once every five year Never encountered in industry 1
Severity Definitions:
1 People
Severity Description
5 Multiple fatalities - from an accident or occupational illness (poisoning, cancer).
4 Single fatality or permanent total disability - from an accident or occupational illness (poisoning, cancer).
3 Major injury or health effects (including Permanent Disability) – Affecting work performance in the longer term, e.g. prolonged absence from
work. Irreversible health damage without loss of life, e.g. noise induced hearing loss, chronic back injuries.
2 Minor injury or health effects –Affecting work performance, e.g. restriction to activities (restricted work case –RWC) or need to take a time
off work to recover (lost time incident – LTI). Limited, reversible health effects, e.g. skin irritation, food poisoning.
1 Slight injury or health effects (incl. first aid case –FAC and medical treatment case –MTC). Not affecting work performance or causing
disability.
2 Assets
Severity Description
5 Extensive damage – Substantial or total loss of operation (costs in excess of AED10, 000,000).
4 Major – Partial operation loss (2 weeks shutdown, costs up to AED10, 000,000).
3 Local damage – Partial shutdown (can be restarted but costs up to AED 500,000).
2 Minor damage – Brief disruption (costs less than AED 100,000).
1 Slight damage - No disruption to operation (costs less than AED10, 000).
3 Environment
Severity Description
5 Massive effect – Persistent severe environmental damage or severe nuisance extending over a large area. In terms of commercial or recreational use or
nature conservation, a major economic loss for the company. Constant, high exceed of statutory or prescribed limits
4 Major effect – Severe environmental damage. The company is required to take extensive measures to restore polluted or damaged environment to its
original state. Extended exceed of statutory or prescribed limits
3 Localized effect – Limited loss of discharges of known toxicity. Repeated exceed of statutory or prescribed limit. Affecting neighborhood. Spontaneous
recovery of limited damage within one year.
2 Minor effect – Contamination. Damage sufficiently large to attack the environment. Single exceed of statutory or prescribed criterion. Single complaint.
No permanent effect on the environment.
1 Slight effect – Local environmental damage. Within the fence and within systems. Negligible financial consequences
4 Reputation
Severity Description
5 International impact – International public attention. Extensive adverse attention in international media. National/international policies with potentially
severe impact on access to new areas, grants of licenses and/or tax legislation.
4 National impact – National public concern. Extensive adverse attention in the national media. Regional/national policies with potentially restrictive
measures and/or impact on grant of licenses. Mobilization of action group.
3 Considerable impact – Regional public concern. Extensive adverse attention in local media. Slight national media and/or local/regional political attention.
Adverse stance of local government and/or action groups.
2 Limited impact – Some local public concern. Some local media and/or political attention with potentially adverse aspects for company operations.
1 Slight impact – Public awareness may exist, but there is no public concern
Note: Reputation also accounts for the liabilities arising from injuries and property damage to third parties
Definitions:
Hazard: Object , effect or condition with potential to cause damage people, assets and/or environment
Threat: The way how a hazard can result into an incident
Incident: Event or chain of events with have caused or could have caused injury, illness, and/or damage
Accident: An incident which resulted in injury, illness, and/or damage
Consequence: The loss that can be inflicted if the accident occurs