Professional Documents
Culture Documents
1. Large generator units connected to the transmission system are replaced by small units
connected to the ___________.
a. Renewable b. Integrated c. Distributed system d. None of them
2. Nuclear power stations will be built near the _______ or near large rivers
a. Mountain b. Coast c. Population d All of the above
3. The primary aims are related to the customer : reliability of supply, voltage quality, and the
_______.
a. Terrif b. Frequency c. Tripping d. Interruption
4. The performance index decreases with the _________ amount of distributed generation.
a. Equal b. No changes c. Decreasing d. Increasing
5. Electrical protection to detect if a section of the distribution network has become isolated or
_________
a. Islanded b. Tripped c. Faulted d. All of them
6. Fault calculation programs are used to calculate the _____________ that would occur for
different network configurations and fault location.
a. Fault Voltage b. Fault severity c. Fault current d. Mal tripping
7. If a load is capacitive, the reactive power that it produces must be _________ by the generator.
a. Consumed b. Absorbed c. Ejected d. Both a & b
8. On-load tap changing transformers, voltage regulators and a static VAr compensator (SVC)
attempt to maintain the __________.
a. Current b. Voltage c. Frequency d. None of them
9. The transformer size is often ______ the load size, so the hosting capacity is about 20% of the
total load connected to the HV/MV transformer.
a. Twice b. Thrice c. Fourth times d. Five times
12. The internal EMF is induced in the stator windings of the synchronous generator by the rotation
of the rotor ________ created by the field winding
a. Magnetic field b. Flux c. Excitation d. None
15. A disadvantage of inverse-time overcurrent protection is that the fault-clearing time can
become very long for low _____________.
a. Fault current b. Break current c. Make current d. Rated current