Professional Documents
Culture Documents
Application Form For Accreditation From Quality Council of India
Application Form For Accreditation From Quality Council of India
I. General Information
Application as (Please tick the appropriate Category):
A. New Industrial Training Institute
Postal Address: GOVERNMENT INDUSTRIAL TRAINING INSTITUTE, SHAHGANJ, TEHSIL- BUDNI, DISTRICT- SEHORE (M.P.)
(Indicate Taluka,
District Details along
WITH Pin Code)
Pin Code: 466554
Tel. No. (With STD Code): N/A Fax No. (With STD Code): N/A
Postal Address: GOVERNMENT INDUSTRIAL TRAINING INSTITUTE, SHAHGANJ, TEHSIL- BUDNI, DISTRICT- SEHORE (M.P.)
Tel. No. (With STD Code): N/A Fax No. (with STD Code): N/A
F. Details of Any other NCVT affiliated ITI’s which are running under the same organization
Name of ITI Address DGET File Ref. No. Trade Name Number of Units Number of
students
- - - - - -
- - - - - -
- - - - - -
2. - Units: -
2. - Units: -
Reason for Shifting of Trade: Welder (Gas & Electrical) Trade is in SCVT curriculum, but not mentioned in list of NCVT curriculum.
II. (B) Trades and units or which affiliation is sought now:
No Admission is allowed in any NCVT Trade before affiliation is granted by NCVT Sub Committee
Sl No. Trades/Units for which affiliation Sought Session (Month & Year) From
Total Units = Which affiliation sought
Trades Units
(3+4+5)
1st Shift 2nd Shift 3rd Shift
1 2 3 4 5 6 7
01 Electrician 01 01 - 02 JULY 2016
02 Fitter 01 01 - 02 JULY 2016
03 Diesel Mechanic 01 - - 01 JULY 2016
04 Welder 01 - - 01 JULY 2016
II. (B) Modules and units under COE Scheme for which affiliation is sought now: NIL
Sl No. Modules/Units for which affiliation Sought Session (Month & Year) From
Total Units = Which affiliation sought
Modules Units
(3+4+5)
1st Shift 2nd Shift 3rd Shift
1 2 3 4 5 6 7
- - - - - - -
- - - - - - -
- - - - - - -
III (A). 1. Manpower
Sl Designation Name Fathers Name Date of Joining Date of Photograph Voter ID Card
No. Institute Birth (U- No./Valid I Card
Upload) (U-Upload)
1 Accountant H C HANOTIYA 08/05/2013 20/04/1959
2 Clerk SANJAY THAKUR HARBHAJAN SINGH THAKUR 28/06/2013 26/01/1983 NRA0065458
Name Secondary School/ Technical Qualifications {Degree/ Diploma, ITI, CTI} Branch year of Passing Certificate No. of Experience Details Salary Salary A/C Details Bank Name, Branch
Matric Year of enclosed certificate (Name of & A/C No. for the Staff Working since
Passing Certificate No. Establishment & Year last two years
of Experience)
Year of Certificate ITI CTI Diploma Degree 1 2 3 Bank A/C No. Branch
Passing Number Nam
(U-upload e
Copy of
certi.)
Year Certificate Year of Certificate Year of Certificate Year of Certificate Nam Post Yrs
of Number Passing Number Passing Number Passing Number e Held of
Passin (U-upload (U-upload (U-upload (U-upload Exp
g Copy of Copy of Copy of Copy of .
certi.) certi.) certi.) certi.)
K S WARKADE 1989 490581 1992 20822 2006 2601 - - - - TS 13 38450 SBI 30064132452 MANDLA
H C HANOTIYA ASSIT.
GRAD
-1
SHAILENDRA 2004 - - - - 2007 2012 TO 3 27000 SBI 30982315862 ITARSI
AGARMORE
PANKAJ PATEL TO 2 27000
DHRUV SINGH 2001 015188455 2007 07/01/3663 2014 ATI/MUM - - - - TO 3 27000 SBI 20008337460 GWALIOR
MOURY /CH-13-
14/0939
RAVINDRA 2003 03510496 2007 25612 - - - - - - TO 2 27000 SBI 32019854739 JABALPUR
PATELIYA
BHUPENDRA 2000 - - 2015 - - 2009 TO 3 27000 SBI 10794149623 BUDNI
CHANDEKAR
KAMLESH PATEL 2004 395537 - - - - - - 2012 08113060 TO 2 27000 PNB
SANJAY THAKUR 2002 02352386 - - - - 2009 9591 C.O. 2 6000 SBI 10900312140 BETUL
CUM-
CLERK
RAHUL 2005 5762188 - - - - 2010 0024828 2013 3650370 TO 2 10,000 SBI 31023299593 BETUL
BARASKER
PREM LAL UIKEY 2004 046331692 - - - - 2009 0036540 2013 3694802 TO 2 10,000 BOI 901410510001 SHAHGANJ
916
IV. (A) INFRASTRUCTURE
Details of Land & Building at the Institute: (Note: All Dimensions on the Drawing to be prepared by registered Architect should be in
MKS system.)- For details please refer Annexure G1
1. Total land area available for the institute as indicated in registration paper/relevant
documents.
2. Whether own or rented building (enclose proof of ownership/ lease deed/rent OWNED
agreement (Upload)
3. Date of occupation 12/12/2015
7. Name of Architect
Note: - Layout of Institute should clearly indicate the workshop for all trade/units/modules, class rooms, I.T. Lab, Principal Room, Drawing
Room (if required) etc. with its dimensions in MKS System.
IV (B). Area available in the Workshops (For details please refer Annexure G2):
Name of the Maximum no. of units in one WORKSHOP
Trade/Module shift only
Required as per NCVT norms (Sq. M) Actually available (Sq M)
Electrician 01 98
Fitter 01 88
Diesel Mechanic 01 210 (Including Parking Area)
Welder 01 80
(Note: Upload front view of Institute, Classrooms photographs, Workshop photographs)
- Number of Floors in the Institute: - 02
- Workshops Roof ( Please tick the appropriate category): - Pitched Roof ( )/ Flat RCC Roof ( √ )
- No. of Washrooms in Institute: - 08
IV (C) POWER SUPPLY (For Details please refer Annex G3):
1. Electrical Connection issued in the name of (i) For existing institute: electricity bill indicating connected load is
2. Electrical Connection issuing authority required to be produced (details of existing trades, units should
3. Date o Connection also form part of the inspection report to assess the required
electrical load. (upload Electricity Bill Indicating connection load)
4. Whether three phase connection
(ii) For new institute: Installation report/ Meter sealing report
5. K. No. of the Connection indicating sanctioned load or if meter sealing report does not have
6. Meter Seal No. sanctioned load, copy of the sanctioned load, proof of payment of
7. Trade (Existing) : N/A Maxi no. of units Power supply required dues for the same along with meter sealing report should be
Trade (New): 04 in one shift as per norms in kW produced/ submitted.
Electrician 01 5.2 (for 2 units in 1 shift) (Upload relevant documents)
Fitter 01 3.51 (iii) where the institute is in the rented/leased building, the electric
connection should be in the name of the owner of the institute/
Diesel Mechanic 01 4.8
management agreement between landlord and the institute/
Welder 01 16 management/ society as the case may be, should be produced
Total electrical Load 19.51 along with the current bill (Upload)
Power supply available in the Institute (iv)Declaration by the owner of the institute that the sanction load
is for ITI only / shared with any other. (Upload)
IV. (D) TOOL, EQUIPMENT & MACHINARIES
(Note: Only new tools, Equipment and machinery to be purchased for new trade /expansion of trade / module wise/ sector wise in case of COE
scheme are required to be given in the following format in the standard tool list available in the syllabus of each trade / module (COE and
available on the DGET website –http//dget.nic.in/welcome/cts/tradeslist.html and www.dget.nic.in /http:// dget.nic.in/coe/welcome.html
S Name of the tools, equipment & Number of tools, Total no of tools Total no of tools & Total no Cost of the tool,
No machinery as per syllabus equipment & and equipment equipment required actually equipments &
machinery required required for the for the total units available for machinery with
for instructor & total units for which affiliation all the units Bill no and
trainees for one unit already affiliated is sought supplier details
as per NCVT norms
syllabus
1 2 3 4 5 6 7
IV (E) Tool, equipment and machineries (General machineries costing above Rs. 10,000)(Please submit the information trade wise/module
wise.)
S Name of the Make Year of Purchased Bill no ( Bill date Vat no Tin no Identification Photograph
No tools, manufacturing from ie copy of bill no punched with
equipment & supplier to be (Yes /No) principal
machinery as address along uploaded) (upload)
per syllabus with tel no
Additional Information Required From Existing Affiliated Institute
I. Whether previously granted affiliation in any trade/module:- NO
If so, particulars to be given as under: N/A
S No. Trade/ Trade/Module/Units Total Total Month DGE&T reference Remarks
Module Units no. of & Year which affiliation
Units (3+5+7) Trainees of Start granted with date
on Roll of (State/UT/Directorate’
(4+6+8) Session s ref/No. Not be
quoted)
1st No. of 2nd No. of 3rd No. of
shift trainees shift trainees shift trainees
on Roll on Roll on Roll
1 2 3 4 5 6 7 8 9 10 11
- - - - - - - - - - - - -
Mobile no.
Email id:
III Upload the copy of Quality System Manual
Declaration
We have carefully read and understand all NABET criteria for accreditation of Government and Private Industrial Training institute
seeking NCVT affiliation. The conformity with requirements of the accreditation criteria i.e. eligibility of staff, infrastructure,
machines, tools, and equipments etc has been verified by us at our end. We confirm that the information provided in support of this
application is correct to the best of our knowledge and belief.
We authorize NABET to make any enquiry as deemed fit as part of the reviewing process. We understand that in case any
information is found to be incorrect, it may result in rejection of this application and/or disqualification. We authorize NABET to
utilize the information provided in this application for legal, research, training, sharing with DGE&T and peer international members
and/or for any other purpose as may be deemed fit by NABET.
If accredited, we commit to notify NABET immediately of any changes in the status where information regarding such changes, if
declared may affect the consideration for accreditation of the institute.
Signature
Name (Authorized Signatory)
Designation
Institute Name
Date