BY : HASNA SALSABILA
1 SURVEY AND
HANDOVER SITE
4 WEEKLY CONTROLING
5 INTERNAL CHECKLIST
3 GROUND BREAK
6 CONSTRUCTION
HANDOVER
PRE CONSTRUCTION
1
o Hal-hal yang perlu diperhatikan :
SURVEY AND Arah saluran air, listrik, jalur transportasi
HANDOVER SITE Potensial cut & fill
dllll
SURVEY AND
HANDOVER SITE
2
KICK OFF MEETING
CONSTRUCTION PROSSES
3
• Penetapan time schedule
GROUND BREAK • Arahan metode kerja &
logistik
• Arahan laporan kerja proyek
• Komitmen K3
• Pengesahan shop drawing
4 • Dokumentasi :
• MOM Weekly meeting
• Wheater report
WEEKLY CONTROLING
• Risk Identification
• Site Instruction/ Scheduling
CONSTRUCTION PROSSES
• Update schedule material
GROUND BREAK SBO ke QS :
LAMPIRAN
• Weekly Progress Report for
project by LL :
4 LAMPIRAN
WEEKLY CONTROLING • Hasil test beton dan baja
untuk project by LL :
LAMPIRAN
PASCA- CONSTRUCTION
5
• Walk Thru Inspection
CHECKLIST • Pemeriksaan shop drawing
dan laporan mutu
• Pelaksanaan Test Com ME :
Alnor, Megger, dll
• Dokumen :
CONSTRUCTION • Check list dari walk thru
HANDOVER
inspection
• Hasil Test Com ME
LAMPIRAN PRA NSO
SHELL KM21
•
6 •
•
Dokumen :
VO
As Built Drawing
• Permit Docs
CONSTRUCTION
• Final report project by kontraktor
HANDOVER
• BAST, Surat garansi
• Jadwal retensi
• LAMPIRAN HANDOVER ASSET
• LAMPIRAN HANDOVER QS