Professional Documents
Culture Documents
AR-28
1 2 3 4 5 6
23650
100 1058 750 1065 750 2830 750 1065 750 1645 750 1065 750 1545 750 1065 750 2145 750 3417
225 10000 225 3000 225 5100 225 1800 225 2400 225
W1 W1 W1 W1 W1 W1 W1 W1 W1
A A
225
225
375
10000 3000 5100
900
1075
1075
1300
D2
TOIL.
750
W1
900
2158 D2
225
225
600
900
1075
1075
1300
D2
BATH.
750
W1
750
W1
400
5450
5000
5000
5000
B B
225
675
SALON POOL HOUSE
4100
900
D2
6825
1065
+750MM
750
+750MM 600mm X 600mm vitrified tlies laid W1
600mm X 600mm vitrified tlies laid on 40mm floor screed. CLOAK.
2400
2400
2625
on 40mm floor screed.
CONFERENCE HALL +750MM
8225
8000
8000
W1
1500
on 40mm floor screed.
10300
2450
on 40mm floor screed.
C C
225
D1 D2
1445
W1
618
900
960
1116
1341
+600MM
600mm X 600mm vitrified tlies laid
950
750
475
W1
D D
225
on 40mm floor screed.
900
1434
1659
1532
2100
3035 1024 1882 1024 2686
1615
2682
E E
225
225
D1 D1
3475
3475
3035 3930 3035 2180
1075
1250
ENTRANCE.
1725
1500
1500
1500
1500
1725
7500
125475
600
F F
225
225
1200
350
350
4500
2
AR-28
300
225 10000 225 3000 225 5100 225 1800 225 2400 225
23750
1 2 3 4 5 6
GROUND FLOOR.
notes 1. drawings not to be scaled, use dimension given. CHECKED ARC. A. J. NTEKOP
N0 DATE DESCRIPTION BY PROJECT TITLE ; PROPOSED RESIDENTIAL CLIENT ; MR. EKERETE GABRIEL SHEET
NO
2. all dimensions are to the nearest mm & must be read with actual dimension on site. DEVELOPMENT. DATE OCTOBER 2019.
3. all details to be read along withrelavant engineer detail ONNA LOCAL GOVERNMENT SCALE 1 : 100
AREA.,AKWA-IBOM STATE.
4. no alteration shall be made on the drawings without the consent of the architect
PROJECT LOCATION ; DESIGNED ; CREWLINE LIMITED.
DRAWN
PROJECT NO
CREWLINE LIMITED
AR-26
Project Number
2 3 4 5
600
G.L. G.L.
1200
2100
F E D C B A
1523
1523
- ALUMINIUM RIDGE CAP
- 0.55mm GUAGE LONG SPAN ALUMINIUM
ROOFING SHEETS ON
75 X 50m TIMBER75 X 50m TIMBER PURLINS @ 900mm c/c ON
4724
150 X 50mm TIMBER RAFTERS @ 1200mm CENTRES.
2 Section 2
1 : 100 40°
3201
40°
3781
9674
9674
280 300
300
452
B.H. B.H.
720
740
280mm x 600mm CONCRETE
40
FASCIA. 600 POP CEILING WITH CORNICE MADE OF
700
(Colour: White gloss paint finish) PLASTER BOARD (GYPSIUM BOARD)
SUSPENDED ON POP YARN STRINGERS
3600
3920
4650
75mm WIDE by 160mm THICK CONCRETE COPING
1800
2860
(Colour: White gloss paint finish)
2160
POOL HOUSE.
600
GROUND FLOOR. GROUND FLOOR.
600 150
750 750
750
450
G.L. G.L.
0 0
2100
2100
FOUNDATION TYPE/DESIGN
(see structural drawing for structural
detailes)
SECTION C-C
notes 1. drawings not to be scaled, use dimension given. CHECKED ARC. A. J. NTEKOP
N0 DATE DESCRIPTION BY PROJECT TITLE ; PROPOSED RESIDENTIAL CLIENT ; MR. EKERETE GABRIEL SHEET
NO
2. all dimensions are to the nearest mm & must be read with actual dimension on site. DEVELOPMENT. DATE OCTOBER 2019.
3. all details to be read along withrelavant engineer detail ONNA LOCAL GOVERNMENT SCALE As indicated
AREA.,AKWA-IBOM STATE.
4. no alteration shall be made on the drawings without the consent of the architect
PROJECT LOCATION ; DESIGNED ; CREWLINE LIMITED.
DRAWN
PROJECT NO
CREWLINE LIMITED
AR-28
Project Number