Signal Signal

Cluster Type Signals Cluster Type


Signals
Peak Hour Traffic Volume (PCU) xxx Morning peak hour
traffic volume
BRT
R

S7 S5,S6

S8
BRT
Evening peak hour
P10 6
A

BRT
(xxx) traffic volume
7 G

8 P7 Afternoon peak

P9
[xxx]

P8
S2, S9 P1-P10 hour traffic volume

S5
S10

2190 (1196) 1861


5
S1, S10 Pole Type Pole No. 401 (150) [258]
P6
219 (177) [206]
S6 Towards Towards
9 S4,S7 1,6,9,5
PCMC 1 (5) [6]
Nashik
S5
S3, S8
Chowk 1102 (850) [1686] Phata
P5
3, 4, 8 879 (480) [932]
S4
4

1336 (818) [1929]


R

323 (446) 1105


S3
P1 A
1 P4
3 G 2,7

0 (0) [0]
P2

P3
S1 2 R
S2

A Legend:
G S - Signal Cluster
P - Pedestrian Signal Cluster Towards Bhosri MIDC
- Signal Pole

PHASES PHASE 1 PHASE 2 PHASE 3 PHASE 4 PHASE 5 PHASE 6 PHASE 7 PHASE 8

From From
NASHIKH PHATA WAKAD

PLAN NO. 1 TIMES OF OPERATION= AM CYCLE LENGTH= 90 sec. OFFSET= 00 sec. COORDINATED JUNCTIONS: NA
Green Yellow All Red Green Yellow All Red Green Yellow All Red Green Yellow All Red Green Yellow All Red
TIME (sec.) 26 3 1 6 3 1 16 3 1 6 3 1 16 3 1
CUMULATIVE
26 29 30 36 39 40 56 59 60 66 69 70 86 89 90
TIME (sec.)

PLAN NO. 2 TIMES OF OPERATION= PM CYCLE LENGTH= 90 sec. OFFSET= 00 sec. COORDINATED JUNCTIONS: NA
Green Yellow All Red Green Yellow All Red Green Yellow All Red Green Yellow All Red Green Yellow All Red
TIME (sec.) 26 3 1 6 3 1 16 3 1 6 3 1 16 3 1
CUMULATIVE
26 29 30 36 39 40 56 59 60 66 69 70 86 89 90
TIME (sec.)

PLAN NO. 3 TIMES OF OPERATION= OFF PEAK CYCLE LENGTH= 90 sec. OFFSET= 00 sec. COORDINATED JUNCTIONS: NA
Green Yellow All Red Green Yellow All Red Green Yellow All Red Green Yellow All Red Green Yellow All Red
TIME (sec.)
26 3 1 6 3 1 16 3 1 6 3 1 16 3 1
CUMULATIVE
TIME (sec.) 26 29 30 36 39 40 56 59 60 66 69 70 86 89 90

INTERSECTION NAME= STATE TRANSPORT TRAINING INSTITUTE SHEET NO. 12

RENOVATION OF TRAFFIC SIGNAL SYSTEM ON NASHIK PHATA - WAKAD BRTS CORRIDOR, PCMC