Upstream/Midstream
lahad datu
Berth
Upstream/Midstream
Project Status
kimanis
Key outcomes of the EPP / KPIs What needs to be done?
• Availability of natural gas supply at SOGIP and spur the huge potential of petro-chemical • Continue with the construction
industry • Continue with land acquisition and networking with Land and Survey Department of Sabah,
• Transfer of technology and knowledge to local manpower and contractors who are involved UPEN Sabah and District Offices
with this project
• Spurring the economy along the pipeline
Upstream/Midstream
Mitigation Plan
• Proper feasibility study on designing the GSP
• Collaboration effort between SEC, PETRONAS and
SOGT
Sabah State Authorities (i.e. Sabah Land and Survey
Department and UPEN Sabah)
GSP
SSGP
Sales will be
transmitted
Bintulu
DOWNSTREAM
Natural Gas
Fuel
Kimanis Power Plant will address the (60 mmscfd)
kimanis
DOWNSTREAM
Key Challenges
• POIC policy not to sell sea front land and project owner
plan to purchase the land for jetty and port to lower
the project cost and ensure the security of long term
investment
• POIC policy for them to build and operate the jetty vs
project owner plan to self build and self operate the jetty
to reduce cost
• Lengthy negotiation period on Power Purchase
Agreement (PPA)
Mitigation Plan
• Work on the agreed price for both parties whether on
selling/purchasing or leasing the land
• Speed up state government decision on the ownership of
the jetty
• Intervention from MPRC, state government into the
negotiation of PPA to speed up the decision
• Proper education planning to prepare and develop the
skilled and semi skilled manpower
DOWNSTREAM
infrastructure for 3,000 Acres of • Fully equipped logistics facility for storage,
transportation, freight forwarding, procurement,
Key Challenges
Industrial Land customs, immigration clearance, agency related
services • Lack of basic infrastructure and public amenities
• Supply base function: purpose-built base with such as road, drainage, water & electricity.
office space, workshops, warehouse complex • Identify new potential private sector to utilise
and open yard ammonia.
• Storage of OCTG, tubular and heavy equipment • Need of investment package to attract investors
• ROW for utilities
Key Challenges • Better road condition and port facilities to export
end products. Accommodation and commercial
• Identify new potential private sector to utilise facilities.
gas, ammonia and urea. • Guaranteed gas supply
• Need of investment package to attract investors
• ROW for utilities
• Better road condition and port facilities to export Mitigation Plan
end products. Accommodation and commercial • To construct basic infrastructures such as site
facilities formation, road, drainage & water reticulation.
Phase 2 Development Plan Phase 3 Development Plan • To provide water supply - 20mld
Mitigation Plan • To provide electricity supply- 18 MW
• Provide 90mmscfd of gas
• To construct basic infrastructures such as road
SOGIP & drainage.
• To provide water supply
OIL, GAS & ENERGY SECTOR
Upstream/Midstream
SSGP