I declare that the work submitted for this practical application assessment ie. the completed observation sheets
and the report to management, is my own work. I recognise that contravention of this statement constitutes
malpractice and may result in my being subject to the penalties set out in the NEBOSH Malpractice policy.
Signature _________________________________
Date 29.08.2018
I declare that the work marked is identical to that received from the candidate. I recognise that contravention of
this statement constitutes malpractice and may result in my being subject to the penalties set out in the NEBOSH
Malpractice policy.
Signature _________________________________
Date _________________________________
I declare that I have marked this work and am both qualified and approved by NEBOSH to do so. I recognise
that contravention of this statement constitutes malpractice and may result in my being subject to the penalties
set out in the NEBOSH Malpractice policy.
Signature _________________________________
Date _________________________________
NB: This declaration must be completed in full, submitted and retained with the
candidate’s script. If this declaration is not submitted the candidate’s result may be
declared void.
APPENDIX 3
NEBOSH
Maximum
Assessor’s moderated
marks
Criteria available
marks awarded marks
(if different)
The mark sheet must be retained by the Course Provider and sent to NEBOSH only if requested.
Sheet number 1 of 12
Place inspected: Oasis Constructions India Pvt Ltd Date of inspection 18/ 08 / 20118
Sheet number 2 of 12
Place inspected: Oasis Constructions India Pvt Ltd Date of inspection 18/ 08 / 2018
Observations Control measures Timescale
Hazards and consequences Immediate and longer term actions
Sheet number 3 of 12
Place inspected: Oasis Constructions India Pvt Ltd Date of inspection 18/ 08 / 2018
Sheet number 4 of 12
Place inspected: Oasis Constructions India Pvt Ltd Date of inspection 18/ 08 / 2018
Sheet number 5 of 12
Place inspected: Oasis Constructions India Pvt Ltd Date of inspection 18/ 08 / 2018
Sheet number 6 of 12
Place inspected: Oasis Constructions India Pvt Ltd Date of inspection 18/ 08 / 2018
Sheet number 7 of 12
Place inspected: Oasis Constructions India Pvt Ltd Date of inspection 18/ 08 / 2018
Observations Control measures Timescale
Hazards and consequences Immediate and longer term actions
16.Environmental Hazard: Immediate actions:
Water gets stagnated in the waste All the water stagnated in the drums Immediate
drums due to rain and causing breeding should be drained immediately.
of mosquito and bacteria like vibrio
cholerae. Longer term actions:
a) All the drums should be kept in indoor 1 week
Consequences: so the rain water won’t get stagnated.
Severe ill-health such as dengue and
malaria due to mosquito and b) Frequent health monitoring to be
waterborne diseases may be occurred. scheduled. Continuous
process
Immediate actions:
17.Vehicle hazard: The truck should be stopped
The contract truck driver found driving immediately. Immediate
vehicle using mobile phone.
Longer term actions:
Consequences: a) A safe driving policy have to be
It would lead to accidents and results scheduled 1 week
in life and property loss.
b) Training should be provided to the
employee. Continuous
process
Immediate actions:
18.Fire Hazard: Fire watcher to be deployed.
Hot work was performed near wood Immediate
patches without basic first aid Longer term actions:
extinguishers and without fire a) Adequate fire watcher to be
watchers. purchased. 5 days
Consequences:
Causes fire accident b) Wood patches to be removed and
work permit protocols to be 2 days
implemented
APPENDIX 4
Sheet number 8 of 12
Place inspected: Oasis Constructions India Pvt Ltd Date of inspection 18/ 08 / 2018
Sheet number 9 of 12
Place inspected: Oasis Constructions India Pvt Ltd Date of inspection 18/ 08 / 2018
Location: Oasis Constructions India Pvt Ltd _ Date of review 18 /09 /2018
The inspection was carried out on 14 th August 2018, from 10:00 AM to 04:00 PM. We
inspected all the working areas of the industry such as construction area, machine operating
area, packing area, storage area, first aid room. The total employees involved were 90. The
working area was provided with appropriate and suitable access and other proper welfare
amenities such as access to drinking water, sanitary facilities, first aid, and safe assembly
zone. There was a Separate Diesel generator to provide power source.
The inspection been conducted with the vision to capture hazards and risks associated with all
available activity, by direct observation, interaction with employees and verifying reports,
Also concerned for legal achievements.
.
APPENDIX 5
Location: Oasis Constructions India Pvt Ltd _ Date of review 18 /09 /2018
Executive Summary
I thank the management of Oasis constructions India Private Limited for providing me an
opportunity to visit their organization in the aspect of health and safety. This observing visit
helps me to enhance my skill sets.
Oasis construction possesses good safety culture throughout all its process and employees. It
majorly concerned the legal enhancements, to avoid legal non – compliance. Safety has given
prior importance than productions, even found violations and neglecting among contractors.
During observations we found some major hazards, which the management have to give
much priority to avoid the risks of such hazards by the recommendations provided in the
report. The hazards highlighted in the report should get much priority to remain safe within
the organization.
The following are the major hazards which create unsafe movements within the industry.
These hazards often being violate some legislation rules framed by legal authorities.
Fire Hazard
Electrical hazard
Ergonomic Hazard
Chemical Hazard
Fall from height hazard
Machinery hazard
APPENDIX 5
Location: Oasis Constructions India Pvt Ltd _ Date of review 18 /09 /2018
APPENDIX 5
Location: Oasis Constructions India Pvt Ltd _ Date of review 18 /09 /2018
Electrical Hazard
While walk around in work process area, found grinding operation in an area. Portable
grinding machine was used for grinding operation. Here we found the cable of the portable
grinding machine been damaged and the inner core was projected outside.
This unsafe condition will result in electrocution, which causes fatal in case of direct contact
with cables.
At the moment we captured the hazard, advised the supervisor to carry the work after
interchanging the cables of the grinding machine. To avoid these circumstances in future, we
have to adopt double insulated cables. Also the work permit procedure to be followed. Each
and every portable machine should be applied for Portable Appliances Test.
By implementing the above said recommendations, we assure that the electrical hazard can be
avoided, by that the accident through electrical hazard should be stopped completely. This
adoption of the recommendations should improve moral value of the organization among the
society and among employees within the organization. While considering the legal reason,
hereby we ensure the applying of all the recommendations to cast out the electrical hazard,
legal compliance would be achieved and it will hike the legal reputations of organization.
The capital cost required to interchange double insulated cables will be INR 50000 and
application of Portable appliances test will cost INR 15000 per year. While comparing the
indirect accidental cost, it is very low.
APPENDIX 5
UNIT GC3 – THE HEALTH AND Candidate report template
SAFETY PRACTICAL APPLICATION
Location: Oasis Constructions India Pvt Ltd _ Date of review 18 /09 /2018
The brick carrying works were performed by employees manually and it has been prolonged
for a long time. As the duration of lifting the bricks for a long while it would result in
ergonomic disorders such as back pain, work related upper limb disorders. Also in another
working area, noticed that employees deployed in bench top rotary grinder, were seated in
non-ergonomic chairs, this would cause adverse health effects.
This long duration of work breaches the legal law “The Factories act, 1948, Every adult
should work only 9 hours per day”.
Here the laying of lifting of brick breaches the standard. We request the management to adopt
automatic brick lifting machines and conveyors to avoid ergonomically hazard. Also for
rotary grinder the management should provide ergonomic certified chairs (BIFMA). Also
frequent medical surveillance should be implemented.
By the successful implementation of the above said recommendations, the safety culture of
the organization is improved. Also it will give a greater moral reputation to the organization.
By implementation of all the ergonomic recommendations the company can avoid legal
prohibition and prosecution by enforcement bodies. If any accident occurs, it will affect the
economical wealth of organization, so the application of remedies improves economic value.
The total cost to be spend for remedies would be, for automatic and brick lifting machine it
costs around INR 1,50,000 and ergonomic chairs costs INR 50,000. These will enhance the
safety culture.
APPENDIX 5
Location: Oasis Constructions India Pvt Ltd _ Date of review 18 /09 /2018
Chemical Hazard
While walk around in the organization, it has been found that the process chemicals like poly
urethane was kept in a open area without any indication and labels. Also in spray painting
area, the operations were carried without any safety precautions. This will adversely affect
health and environment. In contact with such chemical causes, skin irritations, rashes and
inhalation will results in asthma.
This activity strictly violates the law, “The OSHA MSDS regulation”.
This law, recommend strictly to follow the rules said in MSDS. The failure of this law should
result in legal non-compliance. To avoid the adverse health effects of such chemicals, we
strongly recommend, separate chemical storage area with fire proof materials. Also the
MSDS(Material Safety Data Sheet) should be displayed. Also for painting area, appropriate
personal protective equipments such as chemical rate gloves like nitrile gloves, neoprene
gloves and chemical handling masks. This would avoid direct contact with chemicals.
By stong implementation of such appliances, the moral value of the organization will be
enriched among employees and society. Also the legal non-compliance can be avoided. Also
the economic value of organization remains saved.
APPENDIX 5
Location: Oasis Constructions India Pvt Ltd _ Date of review 18 /09 /2018
This is a strong unsafe practice, in case of any incident will result in fatal. This could be
strongly avoided. This also breach the legal standard of, “Indian Safety Standard IS 3521:
1999”.
We strongly recommend the organization to place guard rails around the mobile elevated
work platform to avoid accident. Also we recommend all the safety gadgets to be wear before
entering into the work. Permit to work system to be followed keenly. Frequent inspections
should be in place. Height safety protocol and training should be imparted.
By applying all the safety measures such as placing of safety rail guards and providing safety
gadgets, will improve moral, legal and economic culture of the organization. Overall safety
score of the organization will be increased.
The total cost required to place guards will be INR 50,000. It is very low when compared to
the accidental cost.
APPENDIX 5
Location: Oasis Constructions India Pvt Ltd _ Date of review 18 /09 /2018
Machinery hazard
The portable cutting machine used to cut the rod doesn’t possess safety guards and deadman
switch. In operation of such machines, in case of machine blade failure, the breakage of blade
will hit the physical body of the operator. Also the equipment without deadman switch will
result in incident in case of emergency. It can’t be stopped immediately. This would create the
adverse effects such as physical injury, cut injury.
This activity violates the rule, “R118 – Guarding of machinery recommendation, 1963”
The violation of this rule will result in legal non – compliance.
The application of these remedies will improve the moral, legal and economical values of the
organization. Also it will safeguard employees.
The total cost required to implement this was INR 15,000. This is comparatively low when
compared to accidental cost.
APPENDIX 5
Location: Oasis Constructions India Pvt Ltd _ Date of review 18 /09 /2018
Conclusions
Hereby, I thank the management of Oasis Constructions India Private Limited, for providing
me a great opportunity to inspect the workplace area to identify the hazards, and to interact
with employees to gather the information to safety.
By the direct inspection, been found the major finding such as Fire hazard, chemical hazard,
electrical hazard, ergonomic hazard, machinery hazard, fall from height hazard.
For each of this hazards, the risk level exist within the hazards were identified like, fire and
explosions, work related upper limb disorder, physical injury, fatal.
The remedies to overcome the hazards with cost estimation been provided. By
implementation of such remedy will improve the moral value, legal compliance and
economic health of organization
APPENDIX 5
Location: Oasis Constructions India Pvt Ltd _ Date of review 18 /09 /2018