You are on page 1of 29

ASME Certified Yankee Dryer

King Hardware
May 3rd, 2010
King Hardware
 King Hardware is a dedicated ASME &
PED certified Dryer Cylinder manufacturer
for more than 20 years.

 With 300 plus employees and 10,000


tons of annual production capabilities

 Well known in Europe, Asia & Africa for


delivering products with good quality,
competitive prices and short delivery time.

 Other product lines include Former


Cylinders, Calendar Rolls, Press Rolls,
Mill Rolls, Felt Rolls and Suction Couch
Rolls
Why ASME ?

 The American Society of Mechanical Engineers


Boilers and Pressure Vessels Codes except for
Transportation Tanks (hereafter as ‘ASME Codes’)
have been adopted as boilers and pressure vessels
safety rules by almost all states of US and provinces
of Canada.

 It is mandatory that all boilers and pressure vessels,


which are used in North America and in the scope of
ASME Codes, shall be designed, fabricated and
inspected in accordance with ASME Codes and
stamped ASME Code Symbol stamps.
Why ASME?
 It is not a mandatory requirement for the boilers
and pressure vessels, which are neither used in
North America nor in the scope of ASME Code, to
bear ASME Code symbols.

 However, above mentioned boilers and pressure


vessels may be stamped ASME Code Symbols in the
following cases providing that they are designed,
fabricated and inspected in conformity with ASME
Codes:
 that required by the end user;
 or that required by the local Jurisdiction in the locations where
the boilers or pressure vessels are used (e. g. Australia, South
America).
King Hardware

ASME Certified Process

1. Design
2. Fabrication
3. Examination
4. Inspection
5. Testing
6. Stamping
ASME Certified Process

1. Design
 Assure the drawing, design
calculation and material selected
meet the requirement of ASME
VIII-1

 Check the service restriction


and pressure-temperature
limitations according to the
ASME VIII-1
ASME Certified Process

1. Design
Key Specifications:
• Diameter: up to 3,660 mm
• Face Length: up to 8,000 mm
• Operation Speed: up to 1200 MPM
• Operation Pressure: up to 10 BAR

ASME Requirements:
• Break Test: 6 x Operation Pressure
e.g.. 6x 150 psi= 900 psi (60
BAR)
• Hydrostatic Test: e.g.. 25 bar x 2 Hours,
w/o Leakage
ASME Certified Process

1. Design – Key Components Selection

Bolts:
• Material: Cr/Mo Alloy
• Strength: 10.8 class
• Suppliers: Taiwan

Gasket Seals:
• Material: Patented
• Strength: 28 BAR
• Suppliers: Europe
ASME Certified Process

2. Fabrication- Side Cover

Self-hardening mold:
 Smooth Surface
 Accurate Dimensions
 Easy to Clean
ASME Certified Process

2. Fabrication- Side Cover

Gasket sealing
Casting Machinery
Drilling
ASME Certified Process

2. Fabrication- Side Cover

Journal Grinding Hand Hole Finishing


ASME Certified Process

2. Fabrication – Body

Casting
( Casting Material: Drilling
Comply with the ASME VIII-1 UG-7 ).

Inner Finishing
ASME Certified Process

2. Fabrication – Body

Inner Machinery Outer Machinery


ASME Certified Process

2. Fabrication – Body

Surface Grinding Balance Machinery


ASME Certified Process

2. Fabrication – Body

Balancing
ASME Certified Process

3. Examination

 Examine all materials before fabrication


1. Assure the required thickness
2. Maintain traceability to the material identification

 Examine cylinder and cover sections


1. Assure properly formed to the specified shapes
2. Within the permissible tolerances
ASME Certified Process

3. Examination

 Examine parts as fabrication progresses,


1. Material marking,
2. Dimensional geometries are maintained

 No welding repair were permitted


ASME Certified Process

4. Inspection

Check Dimensions
ASME Certified Process

4. Inspection

Metallographic Surface Inspection


Inspection Roughness ﹤ 0.4 Ra
ASME Certified Process

4. Inspection

Dynamic Balancing
ASME Certified Process

5. Test
 Some parts of dryer cylinder is difficult to
determine the maximum allowable working
pressure or thickness

 When a proof test is considered necessary,


the Manufacturer has the responsibility of
performing the test in the presence of the AI.

The test shall be acceptable to the AI and a


test report shall be made available to the AI.
ASME Certified Process

5. Test – Break Test

 Comply with ASME VIII-1

Spec: 6 x Operation Pressure

Example: 6 x 150 psi= 900 psi


(60 BAR)
ASME Certified Process

5. Test – Hydrostatic Test


 Comply with ASME VIII-1

← 28 bar x 2 Hours,
w/o Leakage
ASME Certified Process

6. ASME Certificate

 Preparing required Data


Report and having it
certified by the Inspector

 Issued by ASME
authorized agency
ASME Certified Process

6. Stamping the Code Symbol

 Applying the required U symbol


stamping and nameplate to the
cylinder

 Assure it is applied to proper


vessel
King Hardware

Final Assembly (w/ Bearings)


King Hardware

Pack and Delivery on Time (﹤ 90 days)


King Hardware

 Happy + Satisfying Customers 


King Hardware is your Best Partner.
Thank You !

You might also like