Professional Documents
Culture Documents
102 2GR
Date : 31.07.2019 - 02.08.2019 103 1GR 1GR
1st DAY
Item Responsible Person Name
9 10 11 12 13 14 15 16 17
開会 / Opening
Gurpreet Singh,T.Shigaki,
⑰ Process Quality Control M.Nakayama ,Rajan , Saket ,
Amit , Gurupartap
Closure of meeting
1st Half 2nd Half 1st Half 2nd Half
102 2GR
Date : 31.07.2019 - 02.08.2019 103 1GR 1GR
1st DAY
Item Responsible Person Name
9 10 11 12 13 14 15 16 17
開会 / Opening
Gurpreet Singh,T.Shigaki,
⑰ Process Quality Control M.Nakayama ,Rajan , Saket ,
Amit , Gurupartap
Closure of meeting
1st Half 2nd Half 1st Half 2nd Half
1 7
11 25
12 26
13 27
14 28
15 ⑧ Manufacturing 29
2 Equipment Control
16 30
17 31
18 32
19 33
2 ⑦ Process Control 91
# HONDA QAV Observation Sheet
# Audit Date : 31.07.2019 to 02.08.2019
Audit Observation
Electricity target not achieved last year & during deciding next year target
production plan not considered so current year target also not achieved.
The breakdown target for 2018-19 is 5.42 hr. in one month for line 100, this target
was not achieved for last year for 4 months, for next year 2019-2020 this target is
reduced by 5% this target is also not achieved for May 2019
Preventive maintenance fixture actual dimensions are being recorded for 25 +/- 0.5
=> 25mm mentioned Master list for jig to be validated is not alliable.
After preventive maintenance how the IPP parts are checked by quality team.
Procedure "Business of Process for spare part management and control " ADSNI 07
-MMD -02 is checked. This procedure is general procedure for spare parts and not
address as how to handle critical spares.
Preventive maintenance check sheet format is not having the control or checkpoint
to include the A and B check sheet for quality confirmation.
For overhauling the criteria for judgment of heater overhauling to be done or not is
not clear in procedure.
For PM mostly generic check sheet is followed for all machines however for some
special machine extra parameters are added.( Special Check sheet for vacuum
achievement m/c) Master list for which machine generic check sheet to be used
and for which machine special check sheet to be used is not clear or summarized.
Rod adjustment vacuum pressure adjusted due to part problem of Rod height
NG,tolerance was -66.7 +/- 2.7 adjusted actual from -66.8 to -69 kpa but this
tolerance is not validated ( There was breakdown for 28 Min).
Assy Stage - Master Sample used for doing calibration at startup does not have the
value for the parameters which it is introduce to be used.
Root Cause Action Plan Resp.
MMD
MMD
MMD
MMD
MMD
MMD
MMD
MMD
MMD
MMD
MMD
CFT
Tar. Date
14-Aug-19
14-Aug-19
14-Aug-19
14-Aug-19
14-Aug-19
14-Aug-19
14-Aug-19
14-Aug-19
14-Aug-19
14-Aug-19
14-Aug-19
HONDA AUDIT OBSERVATION
SR .NO STATUS OBSERVATION ROOT CAUSE ACTION PLAN DEPT DATE August-19 September-19
W1 W2 W3 W4 W5 W1 W2
Electricity Electricity Consumption Trend
Electricity target not achieved last year & during Consumption Trend Change AS per Production
1 deciding next year target production plan not Is Not As per Volume MMD 14-Aug-19
considered so current year target also not Production Volume
achieved.
Last Year 4 Month & brake down target Rule to Be
The breakdown target for 2018-19 is 5.42 hr. in May 2019 nalysis Decide And Addition in
one month for line 100, this target was not Report Submit procedure
2 achieved for last year for 4 months, for next MMD 14-Aug-19
year 2019-2020 this target is reduced by 5% this
target is also not achieved for May 2019
preventive Check 1-PM Check Jig Master List Make
Preventive maintenance fixture actual sheet Checking 2- Jig Cheking Sheet Make
dimensions are being recorded for 25 +/- 0.5 => Method Is Not
3 MMD 14-Aug-19
25mm mentioned Master list for jig to be Avalible
validated is not alliable.
currently rule Is not add in procedure & preventive
After preventive maintenance how the IPP parts avalible Check sheet how many part
4 check MMD 14-Aug-19
are checked by quality team.
PLAN
ACTUAL