AGRO ENGINEERING WORKS

FEASIBILITY STUDY AND RISK ASSESMENT


ENQUIRY NO: Part Name: PAGE : 1 OF
CUSTOMER: Part No: DATE:
SR. NO. Feasibility Concerned YES NO REMARKS
1 Is the design a new concept to the company?

2 Are new materials used in this product?

Are new type of tooling needed for producing this


3 product?
Are all special charecterstics identified in the
4 drawing?

5 Is AGRO ENGINEERING WORKS drawing required?

Are any new standard /test specification required


6 from customer /supplier? Following are some
standard:-

a Customer specific requirements

b Customer Standard

C Material Standard

d Weld Test Specification

Are additional resource (both people and


7 equipment) needed for this design or additional
training required?

Do we need to develop special test equipment ?


8 Do we require customer approval for this
equipments?

9 Any other servicebility requirements?

Are degisn changes pending from customer at the


10 custmer end?

11 Is prototype parts needed?

12 Any other specific requirement?

Have e faced quality /warrenty problems in


13 similler products ?
Is the components/assy secsitive to customer 's
14 plant process or assy?
Are unique in process and final inspection gauge
15 required ? Can we develop these?

Will any new or existing prcesses which are


16 generating special charecterstics controlled by
control charts?
AGRO ENGINEERING WORKS

FEASIBILITY STUDY AND RISK ASSESMENT


ENQUIRY NO: Part Name: PAGE : 1 OF
CUSTOMER: Part No: DATE:
SR. NO. Feasibility Concerned YES NO REMARKS
Are current processes which are generating
17 special charecterstics contoller by controlled
charts?

If yes to above question , is the capability value


18 Cpk>=1.33?
Are any special characterstics generated at the
19 subcontractor end?

If yes, to above question , have you visited them


20 and inform them about the quality requirements
of the capability indices and ppap documents?

Do we require any approval on the drwings or


22 specific from the customer?
Is there any new tooling require fro making this
23 product? Is the lead time for tool making sufficient
for the launch?

24 Can 100% delivery requirements to be meet?

25 Are all supplier identified for this new product/

Is there any new product tecknology or process


26 require for the selected suppliers?
Do select suppliers have delivery issue on current
27 product?
Are proto type sources diffrnt from the regular
28 production sources ?
Are there custmer approved sub contracts neede
29 for this products?

30 Is this a new product for the subcontracts?

Are there any safety ergonomics or environmental


31 concerns ?
Is the shop space currently availble for making this
32 product?
Does the floor layout unable smooth material flow
33 to avoid mix up and unnecessary travel?

34 Is returnable packing Required by customer ?

Conclusion

1 CFT Members :

2 Projects feasible: YES NO


AGRO ENGINEERING WORKS

FEASIBILITY STUDY AND RISK ASSESMENT


ENQUIRY NO: Part Name: PAGE : 1 OF
CUSTOMER: Part No: DATE:
SR. NO. Feasibility Concerned YES NO REMARKS

Condition for Acceptance / Regret

3 Costing Quotation Required


Yes No

DATE: Signature(team leader CFT)