Professional Documents
Culture Documents
Lead - 68 KM - Kodad BOQ (05!10!2018) Final
Lead - 68 KM - Kodad BOQ (05!10!2018) Final
KODADA MUNICIPALITY
DATA BASED ON - 2018 - 2019 SSR
DETAILED & ABSTRACT ESTIMATION
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
1 BLD-CSTN-2-1 (9): Earth work excavation and depositing on bank for all lifts
and with an initial lead of 10m including all operational, incidental, labour
charges such as shoring ,sheeting, planking, strutting, etc. complete for
finished item of work including seigniorage excluding dewatering charges etc
as per SS - 20 B (APSS 308). Data- Bld -
1
a For Lamp Post 1 x 1 0.45 0.45 1.000 0.20
0.20 Cum 369.10 1 Cum
2 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level :
Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate:
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work.for foundation and under flooring bed. Data- Bld -
12
For Lamp Post 1 x 1 0.45 0.45 1.000 0.20
Total Qty 0.20 Cum 3785.55 1 Cum
3 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain
Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work with nomonal reinforcement Data- Bld -
18
a For Lamp Post 1 x 2 0.30 0.300 0.300 0.05
0.05 Cum 5044.84 1 Cum
Total of A+B+C+D+E
0.7855 Say Rs.
447524687.xlsx-Excavation data 1
Page 2 of 2191
Amount
74.00
757.00
252.00
1083.00
0.01 Lakhs
447524687.xlsx-Excavation data 2
Page 3 of 2191 Main sheet
Main sheet
Page 4 of 2191 Main sheet
Main sheet
Page 5 of 2191 Main sheet
Main sheet
Page 6 of 2191 Main sheet
PSC-NC R1+R2
BWSC R1+R2+R3.
Main sheet
Page 7 of 2191 Main sheet
CI & DI
CI Spe
Main sheet
Page 8 of 2191 Main sheet
AC pipes W x 0.85 x IC
HDPE-80
HDPE-100
PVC
Main sheet
Page 9 of 2191
KODADA MUNICIPALITY
#REF!
S No Measurements
Description Nos Qty Rate Per
L B D
A Formation of CC Road
Total Earth work excavation quantity including Rock for sectioning and
* levelling the ground along the alignment.
for widening the existing 6.00m wide CC Road to 11.00m 1 x 2 60.00 4.10 0.400 196.80
Ch.60m to 1500m for formation of 11.00m wide CC Road 1 x 1 1740.00 12.20 0.400 8491.20
8688.00 Cum
1 Earthwork excavation in soils upto SDR by mechanical means including
trimming bottom and side slopes in accordance with requirements of lines ,
grades and cross sections etc., complete for finished item of work for
trench cutting as per MoRT&H specification 301(5th Revision) and as data-
directed by the Engineer-in-Charge MoRTH--Sn.3
EWE in ordinary soils for levelling the land along the alignment - 90% 7819.00 Cum 56.00 1 Cum
2 Excavation for roadway in ordinary rock with hydraulic excavator of 0.9
cum bucket capacity including cutting and loading in tippers, transporting
to embankment site with all lifts and lead beyond 100 m & upto 1000 m,
trimming bottom and side slopes in accordance with requirements of lines,
grades and cross-sections as per Technical Specification Clause 302.3.5
MORD / 301 MORTH
EWE in rocky soils- ordinary rock by Hydraulic excavator 8% 695.00 Cum #REF! 1 Cum
3 Excavation for roadway in hard rock (blasting prohibited) with rock
breakers including breaking rock, loading in tippers and disposal with initial
lift of 3 mts and lead upto 1000 metres, trimming bottom and side slopes in
accordance with requirements of lines, grades and cross- sections as per
Technical Specification Clause 302.3.5 MORD / 301 MORTH
EWE in in hard rock requiring blasting by mechanical means 2% 174.00 Cum #REF! 1 Cum
S No Measurements
Description Nos Qty Rate Per
L B D
4 Granular sub-base/base/surface course with local materials (Table 400.13)
by mix in place method normal Construction of granular sub-base by
providing local material spreading in uniform layers with motor grader on
prepared surface, mixing by mix in place method with rotavator at once
and compacting with smooth wheel roller to achieve the desired density data- road-
complete as per Clause 401.4 as per Technical Specification Clause 408 Sn.76
MORD.
for widening the existing 6.00m wide CC Road to 11.00m 1 x 2 60.00 4.10 0.10 49.20
Ch.60m to 1500m for formation of 11.00m wide CC Road 1 x 1 1740.00 12.20 0.10 2122.80
2172.00 Cum 902.30 1 Cum
S No Measurements
Description Nos Qty Rate Per
L B D
5 Providing Dry lean cement concrete Sub- base over a prepared sub-grade
with coarse and fine aggregate conforming to IS: 383, the size of coarse
aggregate not exceeding 25 mm, aggregate cement ratio not to exceed
15:1, aggregate gradation after blending to be as per table 600-1, cement
content not to be less than 150 kg/ cum, optimum moisture content to be
determined during trial length construction, concrete strength not to be
less than 10 Mpa at 7 days, mixed in a batching plant, transported to site,
laid with a paver with electronic sensor, compacting with 8-10 tonnes
vibratory roller, finishing and curing complete for finished item of work as
per MoRT&H (5th Revision) specification 1500,1700 & 601 (5th Revision)
and as directed by the Engineer-in-Charge for base coarse below CC
Pavement. data- road-
Sn.20
for widening the existing 6.00m wide CC Road to 11.00m 1 x 2 60.00 4.10 0.10 49.20
Ch.60m to 1500m for formation of 11.00m wide CC Road 1 x 1 1740.00 12.20 0.10 2122.80
2172.00 Cum 2883.22 1 Cum
6 Construction of un-reinforced, dowel jointed, plain cement concrete
pavement over a prepared sub base with 43 grade cement @ 400 kg per
cum, coarse and fine aggregate conforming to IS 383, maximum size of
coarse aggregate not exceeding 25 mm, mixed in a batching and mixing
plant as per approved mix design, transported to site, laid with a fixed form
or slip form paver, spread, compacted and finished in a continuous
operation including provision of contraction, expansion, construction and
longitudinal joints, joint filler, separation membrane, sealant primer, joint
sealant, debonding strip, dowel bar, tie rod, admixtures as approved,
curing compound, finishing to lines and grades as per drawing complete
for finished item of work as per MoRT&H (5th Revision) specification
1500,1700 & 602 (5th Revision) and as directed by the Engineer-in- data- road-
Charge Sn.21
for widening the existing 6.00m wide CC Road to 11.00m 1 x 2 60.00 4.10 0.200 98.40
Ch.60m to 1500m for formation of 11.00m wide CC Road 1 x 1 1740.00 12.20 0.200 4245.60
4344.00 Cum 5743.89 1 Cum
S No Measurements
Description Nos Qty Rate Per
L B D
7 Forming earthen shoulders with selective soils obtained from side earth
having MDD of not less than 1.75 gms/cc by mechnical means with all
leads and lifts including pre-watering of soil at borrow area, removal of top
soil, excavation of soils at borrowed area, conveyance of soil, depositing
the soils on the embankment, spreading soils, breaking clods, sectioning
and consolidation with vibratory road roller @ OMC to meet requirement of
table 300-2 of MORT&H including all hire and operational charges of T&P ,
complete for finished item of work as per MORT&H specification 305 (5th data- road-
revision) (Payment will be made based on levels for finished item of work) Sn.54
S No Measurements
Description Nos Qty Rate Per
L B D
B Construction of Median with CRS Walls 1.20 m wide
1 BLD-CSTN-2-2(10):Earth work excavation in Ordinary soils by
Mechcanical Means-Upto 3 m depth for foundations and depositing on
bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting,
etc. complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308).
for construction of CRS walls on both sides of the Median 1 x 2 1800.00 0.50 0.40 720.00
720.00 Cum 105.85 1 Cum
2 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level:
Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate:
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work.for foundation and under flooring bed.
below CC walls on both sidesof the Median 1 x 2 1800.00 0.50 0.10 180.00 Cum 3785.55 1 Cum
3 BLD-CSTN-6-5-(60) : Construction of CRS Masonary 1st Sort in Cement
Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance
of all materials like Cement, Sand , Water, Granite Stones, including
Seigniorage Charges on all Materials, ,labour charges for cutting Stones
to required size and shape, mixing of Cement Mortor, Construction,
Scaffolding Charges curing etc., complete for finished item of Work .
CRS walls on both sides of the Median 0.36m below GL and 0.75m
1 x 2 1800.00 0.300 1.05 1134.00 Cum 4605.86 1 Cum
above GL
4 BLD-CSTN-7-3-(74) : Providing raised or Cut Cement Pointing on coursed
or Ashlar stone masonry or concrete block walling in white cement mortar
1 : 3 (1 white cement : 3 marble dust).including cost & conveyance of all
materials to site , seignaiorage charges on all materials, labour charges
on all materials, curing etc., Complete for finished item of work
on outer sides of the CRS walls above GL ( 0.75 sides) 1 x 2 1800.00 0.75 2700.00 Sqm 234.88 1 Sqm
S No Measurements
Description Nos Qty Rate Per
L B D
5 BLD-CSTN-3-21 - (33) - Damp proof course 50mm thick with cement data- road-
concrete (1:2:4 Nominal mix), using 12mm hard broken stone aggregate Sn.51
including cost of all materials, seigniorage charges, excluding conveyance
charges of materials, including the cost of machinery, labour charges,
mixing, placing in position, leveling, vibrating, curing etc. complete for
finished item of work. (Using concrete mixer)
Coping over the CRS walls 1 x 2 1800.00 0.35 1260.00 Sqm 264.23 1 Sqm
6 BLD-CSTN-2-9 (17) : Filling with useful available excavated earth
(excluding rock) in trenches, sides of foundations and basement with initial
lead in layers not exceeding 15 cm thick, consolidating each deposited
layer by watering and ramming including cost and conveyance of water to
work site and all operational, incidental, labour charges, hire charges of T
& P etc., complete for finished item of work. (APSS NO. 309 & 310) data- road-
Sn.74
for filling in side the median with available excavated earth. 1 x 1 1800.00 0.60 0.60 648.00 Cum 29.94 1 Cum
7 Imporatation of good quality red earth congenial for plants grouth of light
textured, crystalline, porous and friable, generally acidic or neutral but not
alkaline, fertile, cost, transportation, loading, unloading etc complete
for filling in side the median with red earth ( Top Layer) 1 x 1 1800.00 0.60 0.15 162.00 Cum 1231.59 1 Cum
8 RBR-HRTC-1: Spreading of sludge farm yard manure or/ and good earth
data- road-
in required thickness (cost of sludge, farm yard manure or/and good earth
Sn.75
to be paid for separately) as per Specification 307 MORTH
Quantity as per collection 162.00 Cum 0.00 1 Cum
B. Cost of Median
Say Rs.
C Construction of Foot paths
9 BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual
Means- for structures in all types of soil as per drawing and technical
specifications and depositing on bank for all lifts and with an initial lead of
10m including all operational, incidental, labour charges such as shoring
,sheeting, planking, strutting, etc. complete for finished item of work
including seigniorage excluding dewatering charges etc as per SS - 20 B
(APSS 308).
for Footpath walls 2 x 2 1800.00 0.25 0.20 360.00 Cum 210.92 1 Cum
S No Measurements
Description Nos Qty Rate Per
L B D
10 RBR-TSRA-29 : Cast in Situ Cement Concrete M20 Kerb: Construction of
cement concrete kerb with top and bottom width 115 and 165 mm
respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation
150 mm thick, foundation having 50 mm projection beyond kerb stone,
kerb stone laid with kerb laying machine, foundation concrete laid
manually, all complete as per clause 408 MORTH
Filling in footpaths below CC Blocks 1 x 2 1800.00 1.70 0.075 459.00 Cum 3680.73 1 Cum
13 RBR-CCPV-13 - ii: Providing and Laying of Interlocking Concrete Block
Pavements using precast concrete blocks for paving of M-35 grade and
thickness not less than 60 mm for Light traffic areas conforming to IS
15658:2006 in all shapes and designs as per the manufacturer's
Specification including cost and conveyance of all material and all labour
charges etc,. complete.
S No Measurements
Description Nos Qty Rate Per
L B D
15 Supply and fixing in position of MS Gratings in Drain CC walls including
cost and conveyance of all material and all labour charges etc,. Complete.
MS Grating of 0.30m x 0.15m size @ every 10m on both sides 2 x 180 0.30 0.15 16.20 Sqm
MS Gratings @ 1.20 Kg/ 0.45 Sqm 19.44 Kg 78.52 1 Kg
16 TBSP-H.I-01:Supplying and fixing of SWR PVC pipes (as per ISI
standards) 4 Kg/Sq.cm. and fixing including cost and conveyance of all
materials to site, labour charges etc.complete for finished item of work.
90mm dia PVC 4 Kg cm2 pipe 2 x 180 2.25 810.00 Rmt 141.01 1 Rmt
C. Cost of Footpaths
Say Rs.
S No Measurements
Description Nos Qty Rate Per
L B D
D Construction of CC Drain
1 BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual
Means- for structures in all types of soil as per drawing and technical
specifications and depositing on bank for all lifts and with an initial lead of
10m including all operational, incidental, labour charges such as shoring
,sheeting, planking, strutting, etc. complete for finished item of work
including seigniorage excluding dewatering charges etc as per SS - 20 B
for CC Drains
(APSS 308). on both sides of the road 1 x 2 1800.00 1.10 1.05 4158.00
for RCC culverts 1 x 12 10.00 1.20 1.25 180.00
4338.00 Cum 210.92 1 Cum
2 RBR-FNDN-4 : B-i : .Providing concrete for plain/reinforced concrete in
open foundations using 40 mm nominal size Graded hard stone
aggregate, mechanically mixed, placed in foundation and compacted by
vibration including curing for 14 days complete as per drawings and
technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500,
1700 & 2100 MORTH. : P.C.C grade M 15 (Design Mix) MORTH 12.8 A
using 40 mm Graded Metal
for CC Drains on both sides of the road 1 x 2 1800.00 1.10 0.10 396.00
for RCC culverts 1 x 12 10.00 1.20 0.15 21.60
417.60 Cum 4733.96 1 Cum
3 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and
10mm size HBG crushed stone aggregate (Coarse aggregate conforming
to table 1000-1 and fine aggregate conforming to table 1000-2) including
cost and conveyance of all materials to site and all labour charges for
machine mixing,laying in position, Compacting , Vibrating and curing
including all other incidental and all other operational charges of T&P
required etc., complete as per MoRT&H Specification 1500,1700, 2100
(5th Revision) for footings and Raft foundation .
S No Measurements
Description Nos Qty Rate Per
L B D
4 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and
10mm size HBG crushed stone aggregate (Coarse aggregate conforming
to table 1000-1 and fine aggregate conforming to table 1000-2) including
cost and conveyance of all materials to site and all labour charges for
machine mixing, laying in position,Compacting, Vibrating and curing
including all other incidental and all other operational charges of T&P
required etc., complete as per MoRT&H Specification 1500,1700, 2200
(5th Revision) for Sub structure .
S No Measurements
Description Nos Qty Rate Per
L B D
Deduct Drain vent Qty -379.80
Deduct Drain Qty -1 x 2 1800.00 1.00 0.60 -2160.00
Deduct Culvert Qty -1 x 12 10.00 1.10 0.60 -79.20
for filling in side the foot paths with available excavated earth. 1301.40 Cum 29.94 1 Cum
8 Providing HYSD bars ( Fe-415 ) of different diameters, wrought and put up
bars of all diameters including cost and conveyance of steel to site and all
labour charges for fabrication of reinforcement including cutting, bending,
binding rods, tying grills, placing them in position etc., complete including
cost and conveyance of binding wire and all handling charges and
operational charges etc., and including over lapping welding if required
etc., complete for all R.C.C items for finished item of work as per standard
drawings, as per the directions of the Engineer-in-Charge and as per
MoRT&H specification 1600 & 2200 (5th revision) and as per I.S.1786
of 1985 for Sub structure of R.C.C items.
Steel for RCC culvert slabs @ 120Kgs for Cum of RCC 26.40 120.00 Kg/cum 3168.00 kg 56.71 1 kg
D. Cost of CC Drains
Say Rs.
E Providing Central Lighting
1 ELEC-7.2.3 : Fabrication, Transportation and supply of hot-dip galvanized
Octogonal Pole with BSEN -10025 grade S 355 JO steel plate for shaft, IS
2062 for base plate with door opening arrangement, including the supply
of suitable boards with bakelite sheet and MCB's as per IS specification
suitable to withstand the wind speed of 180 KMPH for 9mtrs height Pole
having dimensions Bottom 155mm, Top 70mm with 3mm thick, base
plate 260 x260 x16mm and 4 Nos of M24 x 750 long 'J' bolts along with
template ofMakes: Bajaj / Valmont / TRANSRAIL
1 x 51 51 Nos #REF! 1 Nos
2 ELEC-7.3.3 : Fabrication, Transportation and supply of of 1.5mtrs
sword type decorative double arm bracket with dooms either sides
complete with all accessories with MS galvanized 50mm dia Pipe.
1 x 51 51 Nos #REF! 1 Nos
S No Measurements
Description Nos Qty Rate Per
L B D
3 ELEC-7.9.3 : Foundation and erection charges with special T&P, for
9.00Mtrs / 10Mtrs long Octagonal / Conical pole duly erecting on base
plate duly providing 4 Nos foundation bolts with nuts with providing of
0.60Mtr x 0.60Mtrs x 1.40 Mtr size M20 cc work vibrated concreting mixing
with necessary steel (15kgs) reinforcement as directed by the field
engineers during execution including all labour charges and cost and
conveyance of materials etc. complete
1 x 51 51 Nos #REF! 1 Nos
4 ELEC-4.1.10 : Supply of 10 Sqmm 4 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part
- I) of Makes : RPG / Finolex / Paragon / V-Guard / Fortune Art / Suncab /
Finecab / Gemscab / Payal.
4 Core 10 Sqmm 1 x 1 1785 1785 Rmt #REF! 1 Rmt
5 ELEC-4.1.12 : Supply of 16 Sqmm 4 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part
- I) ofMakes : RPG / Finolex / Paragon / V-Guard / Fortune Art / Suncab /
Finecab / Gemscab / Payal.
4 Core 16 Sqmm 1 x 1 128 128 Rmt #REF! 1 Rmt
6 ELEC-4.8.2 : Supply and Transportation of Outer dia 63mm and Inner dia
51mm double walled corrugated HDPE duct made as per specification
BSEN - 500 86/IS 14930 Part-II. Makes:DURA LINE (Dura Guard) or its
equivalent make.
51mm dia DWC pipe 1 x 1 1785 1785 Rmt #REF! 1 Rmt
7 Supply and erection of the feeder pillar box of MS sheet of 14 SWG 110 X
700 X 250 mm in size and painted with 2 coats of red oxide and two coats
of synthetic enamel paint of light gray shade (or power coated). The FPB
should be out door type, dust and vermin proof, confirming to IP – 55
degree of protection as per IS – 2147. The inner door of the box should be
having an interlocking arrangement. Single compression cable glands and
crimping type lugs shall be carried out with copper standard conductor,
flexible PVC insulated 1100 V grade wire. The FPB should consists the
following.
LS
S No Measurements
Description Nos Qty Rate Per
L B D
a) Out door with concealed hinges and neoprene sponge gasket.
b) Hinged inner door.
c) MS bracket for pad locking facility with Canopy.
d) 3 Nos siemen’s type door lock with key on outer door.
e) Dancer notice plate.
f) MS base channel 50 x 50 x 3 mm thick and 2 Nos thumb screws.
g)1 No Micro processed based electronic timer.
h) 3 Nos 63 A HRC fuses EE or equivalent make. LS
k) 4 Nos 60 A TPN MCB’s as out going MDS / Havell’s
l) 4 Nos 25 x 6mm thick alluminium bus bars for R.Y.B phases and neutral
mounted rigidly on suitable insulators.
m)1 No 110 A Contactor (ML – 6) L&T make.
n) 1 No kaycee make auto / mannual switch.
o) Removable undrilled MS painted cable gland plate.
p) MS base plate for mounting switch gear components.
q) 4 Nos foundation holes in base channel to suit M 12 foundation bolts.
r) 4 Nos 4 way terminal blocks for outgoing cricuits open barrier type
balson / Everest / Essen or equivalent make (1 No. 100 A four way
terminal block for incoming open barriers type or balson / everest / essen
or equivalent make.
s) 2 Nos earthing studs (M10) with nut and spring washer etc,.
S No Measurements
Description Nos Qty Rate Per
L B D
40mm Nominal Bore medium grade G.I.Pipe 1 x 1 102.00 102 Rmt #REF! 1 Rmt
S No Measurements
Description Nos Qty Rate Per
L B D
12 ELEC-3.5.1: Supply & Installtion of Automatic Street Light Control System
with Optical Sensor, Low volatage / High voltage trip and reset, operating
voltage 150 - 280V AC, 50 HZ with suitable SMC enclousure of IP 54
protection, MCBs and contactor suitable to control the load of 3 KW of
single phase load with necessary clamping arrangements. Makes :
Swadeep Nature Switch / Light Mate.
1 x 1 1 No #REF! 1 No
13 BLD-ELEC-5-1-1 : Providing independent earthing for sophisticated
equipment like computer medical Equipment, Electronic Gadgets etc., with
600mm x 600mm x3.15 mm thick copper plate rigidly fixed to the 40mm
dia GI pipe of 2.5 Mtrs. Length and 19mm dia ‘B’ class GI pipe of 0.3 M
long connected with reducer providing GI funnel covers with wire mesh of
suitable size staggered holes of 16 Nos of 12mm dia to the earht
electrode, enclosed in a CC chamber of 400mm x 400mm x 400mm
covered with reinforced cement concrete cover and all labour charges
RCC slab cover duly filing salt and charcoal in layers from the bottom of
the earth pit, giving earth connections from the electrodes to GI strip 25 x
6 x 200mm length provided with holes GI washers, boths and labour 1 x 3 3 Nos 3906.33 1 Nos
charges etc., complete.
14 BLD-ELEC-7-4-2 : Supply and erection of Integral street light luminaire of
150W MH lamp fitting comprises of single piece die cast Aluminium body
with copper wound ballast and capacitor, Ignitor, with pot optics including
150W MH lamp etc., complete.
150W MH lamps 2 x 51 102 Nos 5538.73 1 Nos
15 Laying of PVC armoured under ground cable in existing duct as directed
by the department including cost and conveyance of all materials and
labour charges etc., complete.
Armoured cable 1 x 1 1964 1964 Rmt 15.00 1 Rmt
16 Laying of 63mm and Inner dia 51 mm double walled corrugated HDPE
as directed by the department including cost and conveyance of all
materials and labour charges etc., complete.
Laying DWC pipe in Median 1 x 1 1785 1785 Rmt 15.00 1 Rmt
17 Supply of 6-32A !OKA SP MCB, C/D Curve ISI Mark. Makes : Legrand-
DX3 / Schneider-Acti9 / Siemens / L&T / Exora. As per SSR No:
ELEC2.9.1, SI.4No:
Supply of 63A Way282
Connector 1 x 102 102 Nos #REF! 1 Nos
18 Supply and Run of No.8 SWG G.1 wire including cost of all accessories
and labour charges etc., complete.
1 x 459 459 Rmt #REF! 1 Rmt
S No Measurements
Description Nos Qty Rate Per
L B D
19 Fabrication supply and errection of water tight M.S junction Box 260 x 300
x 140 mm (depth) size and 16 guage MS sheet with fixing arrangements,
with necessary holes for cable entry and exit from the box. The box shall
be provided with cover and hinges on one side and bolting at other end.
The box shall be fixed by clamps fabricated from 25mm x 3mm MS flat.
The box consisting of 2 Nos of MCB and 1 No of 60 AMPS ‘L’ way
consider doubl arm and box shall be painted with one coat of Red Oxide
and two coats aluminium paint including transportation etc., complete for
finished item of work.
1 x 4 4 Nos 5751.83 1 No
E. Cost of Central Lighting Rs.
Say
Total of A+B+C+D+ E
Say
ADA MUNICIPALITY
#REF!
Amount
437864.00
#REF!
#REF!
Amount
1959796.00
Amount
6262354.00
24951458.00
Amount
73451.00
#REF!
#REF!
Amount
76212.00
681399.00
5223045.00
634176.00
Amount
332930.00
19401.00
199518.00
0.00
7166681.00
71.67 Lakhs
75931.00
Amount
2060928.00
13500.00
1689455.00
3636500.00
161096.00
Amount
1526.00
114218.00
7753154.00
77.53 Lakhs
Amount
914971.00
1976902.00
1490369.00
Amount
5125013.00
118509.00
969822.00
Amount
38964.00
179657.00
10814207.00
108.14 Lakhs
#REF!
#REF!
Amount
#REF!
#REF!
#REF!
#REF!
Amount
96000.00
#REF!
#REF!
#REF!
Amount
#REF!
Amount
#REF!
11718.99
564950.46
29460.00
26775.00
#REF!
#REF!
Amount
23007.32
#REF!
#REF!
#REF!
#REF!
Improvement of Two Lane Road at NH-16 to Housing Board Colony park with Central
Lighting, Median and Side drains
Amount in Lakhs
#REF!
47.32
66.37
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
KODADA MUNICIPALITY
Improvement of Four Lane Road from Ambedkar Circle Junction to Gol Bunglow via
Municipal Office with Central Lighting
Sub - Total - B
Total cost of the Project Rs.
Say
ghting
Amount in Lakhs
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
6.27
#REF!
#REF!
#REF!
Page 45 of 2191
KODADA MUNICIPALITY
Improvement of Four Lane Road from Ambedkar Circle Junction to Gol Bunglow via Municipal Office with Central Lighting
S No Measurements
Description Nos Qty Rate Per
LB D
A BT Road on both sides of the existing CC road
* Total Earth work excavation quantity including Rock for sectioning
and levelling the ground along the alignment.
Ch-500m to 2000m 1 x 2 1500.00 2.95 0.475 4203.75 Cum
1 Earthwork excavation in soils upto SDR by mechanical means
including trimming bottom and side slopes in accordance with
requirements of lines , grades and cross sections etc., complete for
finished item of work for trench cutting as per MoRT&H specification data-
301(5th Revision) and as directed by the Engineer-in-Charge MoRTH--Sn.3
EWE in ordinary soils for levelling the land along the alignment - 90% 3783 Cum 56.00 1 Cum
2 Excavation for roadway in ordinary rock with hydraulic excavator of
0.9 cum bucket capacity including cutting and loading in tippers,
transporting to embankment site with all lifts and lead beyond 100 m
& upto 1000 m, trimming bottom and side slopes in accordance with
requirements of lines, grades and cross-sections as per Technical
Specification Clause 302.3.5 MORD / 301 MORTH
EWE in rocky soils- ordinary rock by Hydraulic excavator 8% 336 Cum #REF! 1 Cum
3 Excavation for roadway in hard rock (blasting prohibited) with rock
breakers including breaking rock, loading in tippers and disposal with
initial lift of 3 mts and lead upto 1000 metres, trimming bottom and
side slopes in accordance with requirements of lines, grades and
cross- sections as per Technical Specification Clause 302.3.5
MORD / 301 MORTH
EWE in in hard rock requiring blasting by mechanical means 2% 84 Cum #REF! 1 Cum
S No Measurements
Description Nos Qty Rate Per
LB D
4 Granular sub-base/base/surface course with local materials (Table
400.13) by mix in place method normal Construction of granular sub-
base by providing local material spreading in uniform layers with
motor grader on prepared surface, mixing by mix in place method
with rotavator at once and compacting with smooth wheel roller to
achieve the desired density complete as per Clause 401.4 as per data- road-
Technical Specification Clause 408 MORD. Sn.76
for formation of new BT Road on both sides of median 1 x 2 1500.00 2.95 0.20 1770
1770 Cum 902.30 1 Cum
5 Providing, Laying, Spreading and compacting graded HBG crushed
stone aggregate to Wet Mix macadem specification including cost,
seignorage of all materials and including premixing the material with
water at OMC in Mechanical mix plant carriage of mixed material by
tipper to site , laying in uniform layers with paver in base courses on
well prepared surface and compacting with Vibratory roller to acheive
the desired density etc., as directed by the Engineer-in-Charge and
as per MoRT&H specification.406 (5th revision) for finished item of data- road-
work. (Payment based on levels for finished item of work) Sn.8
S No Measurements
Description Nos Qty Rate Per
LB D
7 Providing and laying of Dense Graded Bituminous Macadam with
100 - 120 TPH batch type hot mix plant producing an average output
of 75 tones per hour using hard blasted granite crushed aggregates
of Grading - II as per table 500-10 of MoRT&H Specification 505
(5th revision) premixed with bituminous binder of VG 30 grade @
4.50% of weight of total mixture, transported to site, laid over a
previously prepared surface with a hydrostatic paver finisher with
sensor control to the required grade, level and alignment and rolled
as per Clauses 501.6 and 501.7 to achieve the desired compaction
for finished item of work as directed by the Engineer-in-Charge
including hire and operational charges all T&P and all other
contingent charges necessary including cost of (excluding
seigniorage) charges of all materials etc., complete in all respects as
directed by Engineer-in-Charge and as per MoRT&H specification
No. 505 (5th Revision) data- road-
Sn.14
over existing and proposed roads on left side of the meridian 1 x 2 1500.00 2.85 0.050 427.50
427.50 Cum 7736.39 1 Cum
S No Measurements
Description Nos Qty Rate Per
LB D
8 Providing and applying tack coat with bitumen emulsion (RS-1) Bulk
using emulsion pressure distributor at the rate of 0.20 kg per sqm on
the prepared bituminous/granular surface cleaned with mechanical data- road-
Sn.10
broom as per MoRTH. specification No 503 (5th Rivision)
over existing and proposed roads on left side of the meridian 1 x 2 1500.00 2.75 8250.00
8250.00 Sqm 8.71 1 Sqm
9 Providing 25 mm thick compacted Semi-Dense Bituminous Concrete
by hot mix plant using hard blasted granite crushed aggregates of
Grading -2 as per table 500-15 of specification 508 of MoRT&H (4th
Revision), premixed with bituminous binder 60/70 grade @ 5% of mix
and filler, transporting the hot mix to work site, laying with mechanical
paver finisher to the required grade, level and alignment, rolling with
smooth wheeled,vibratory and tandem rollers to achieve the desired
compaction as per MoRT&H Specification 508 (4th Revision)
complete for finished item of work in all respects as directed by
data- road-
Engineer-in-charge.
Sn.15
over existing and proposed roads on left side of the meridian 1 x 1 1500.00 11.00 0.025 412.50
412.50 Cum 7804.55 1 Cum
10 RBR-TSRA-12 : Road Marking with Hot Applied Thermoplastic
Compound with Reflectorising Glass Beads on Bituminous Surface :
Providing and laying of hot applied thermoplastic compound 2.5 mm
thick including reflectorising glass beads @ 250 gms per sqm area,
thickness of 2.5 mm is exclusive of surface applied glass beads as
per IRC:35 .The finished surface to be level, uniform and free from data- road-
streaks and holes as per Specification 803 MORTH Sn.77
S No Measurements
Description Nos Qty Rate Per
LB D
Zebra lines for Crossing 6 x 12 72
2072 Nos 416.98 1 Nos
12 Forming earthen shoulders with selective soils obtained from side
earth having MDD of not less than 1.75 gms/cc by mechnical means
with all leads and lifts including pre-watering of soil at borrow area,
removal of top soil, excavation of soils at borrowed area, conveyance
of soil, depositing the soils on the embankment, spreading soils,
breaking clods, sectioning and consolidation with vibratory road roller
@ OMC to meet requirement of table 300-2 of MORT&H including all
hire and operational charges of T&P , complete for finished item of
work as per MORT&H specification 305 (5th revision) (Payment will
be made based on levels for finished item of work)
data- road-
Sn.54
ng
Amount
211848.00
#REF!
#REF!
Amount
1597071.00
4423385.00
295413.00
Amount
3307307.00
Amount
71858.00
3219377.00
427195.00
Amount
863983.00
40806.00
#REF!
#REF!
KODADA MUNICIPALITY
Construction of Divider and central lighting
Improvement of Four Lane Road from Ambedkar Circle Junction to Gol Bunglow via Municipal Office with Central Lighting
S No Measurements
Description Nos Qty Rate Per
LB D
A Construction of CC Road Divider
1 BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual
Means- for structures in all types of soil as per drawing and technical
specifications and depositing on bank for all lifts and with an initial
lead of 10m including all operational, incidental, labour charges such
as shoring ,sheeting, planking, strutting, etc. complete for finished
item of work including seigniorage excluding dewatering charges etc data- Sewer-
as per SS - 20 B (APSS 308). Sn.15
for Laying Road devider 1 x #REF! 0.90 0.35 0.10 #REF! Cum 3680.73 1 Cum
3 Vibrated cement concrete M 15 Grade Concrete using 40mm ,
20mm and 10mm size HBG crushed stone aggregate (Coarse
aggregate conforming to table 1000-1 and fine aggregate conforming
to table 1000-2) including cost and conveyance of all materials to
site and all labour charges , centering, machine mixing, laying in
position,Compacting, Vibrating and curing including all other
incidental and all other operational charges of T&P required etc.,
complete as per MoRT&H Specification 1500,1700, 2200 (5th
data- road-
Revision) for Dividers . Sn.48
447524687.xlsx - 2. CC Divider-Ambedkar
Page 56 of 2191
S No Measurements
Description Nos Qty Rate Per
LB D
Road Divider of 0.90m length & 0.30m wide ( up to 0.3m height) 1 x #REF! 0.90 0.300 0.30 #REF!
Road Divider of 0.90m length & 0.30m wide ( 0.3m to 0.5m height) 1 x #REF! 0.90 0.250 0.15 #REF!
#REF! Cum 3924.09 1 Cum
4 Plastering in CM (1:5) 12 mm thick including cost and conveyance of
all materials, labour charges , curing etc complete for finished item of data- road-
work as directed by the Engineer -in-Charge Sn.50
Both sides of the Divider ( Length wise) up to 0.3m height 2 x #REF! 0.90 0.30 #REF!
Sloped portion including Top 1 x #REF! 0.90 0.55 #REF!
#REF! Sqm 76.97 1 Sqm
5 Painting two coats with synthetic enamel paint in all shades on new data- road-
plastered concrete surfaces as directed by the Engineer-in- charge. Sn.51
447524687.xlsx - 2. CC Divider-Ambedkar
Page 57 of 2191
Amount
#REF!
#REF!
447524687.xlsx - 2. CC Divider-Ambedkar
Page 58 of 2191
Amount
#REF!
#REF!
#REF!
#REF!
#REF!
447524687.xlsx - 2. CC Divider-Ambedkar
KODADA MUNICIPALITY
Improvement of Four Lane Road from Ambedkar Circle Junction to Gol Bunglow via
Municipal Office with Central Lighting, Median and Side drains
Amount in Lakhs
#REF!
52.16
69.63
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Page 61 of 2191
KODADA MUNICIPALITY
Improvement of Four Lane Road from Ambedkar Circle Junction to Gol Bunglow via Municipal Office with Central Lighting, Median and Side drains
S No Measurements
Description Nos Qty Rate Per
LB D
A Formation of BT Road
* Total Earth work excavation quantity including Rock for sectioning
and levelling the ground along the alignment. as per LS
1 x 1 1156.00 30.50 0.200 7051.60 Cum
1 Earthwork excavation in soils upto SDR by mechanical means
including trimming bottom and side slopes in accordance with
requirements of lines , grades and cross sections etc., complete for
finished item of work for trench cutting as per MoRT&H specification data-
301(5th Revision) and as directed by the Engineer-in-Charge MoRTH--Sn.3
EWE in ordinary soils for levelling the land along the alignment - 80% 5641 Cum 56.00 1 Cum
2 Excavation for roadway in ordinary rock with hydraulic excavator of
0.9 cum bucket capacity including cutting and loading in tippers,
transporting to embankment site with all lifts and lead beyond 100 m
& upto 1000 m, trimming bottom and side slopes in accordance with
requirements of lines, grades and cross-sections as per Technical
Specification Clause 302.3.5 MORD / 301 MORTH
EWE in rocky soils- ordinary rock by Hydraulic excavator 15% 1058 Cum #REF! 1 Cum
3 Excavation for roadway in hard rock (blasting prohibited) with rock
breakers including breaking rock, loading in tippers and disposal with
initial lift of 3 mts and lead upto 1000 metres, trimming bottom and
side slopes in accordance with requirements of lines, grades and
cross- sections as per Technical Specification Clause 302.3.5
MORD / 301 MORTH
EWE in in hard rock requiring blasting by mechanical means 5% 353 Cum #REF! 1 Cum
S No Measurements
Description Nos Qty Rate Per
LB D
4
Forming embankment with Side earth by mechanical means upto
SDR including pre-watering of soil , removal of top soil, excavation of
soils , depositing the soils on the embankment, spreading soil,
breaking clods, sectioning , grading and consolidation with 8 to 10
Tonnes Vibratory Road Roller @ OMC to meet requirement of table
300-2 of MoRT&H, including all hire and operational charges of
T&P, complete for finished item of work as per MoRT&H
specification 305 (5th revision) (Payment will be made based on
level for finished item of work).
Total Filling Quantity 1 x 1 1156.00 30.50 0.100 3525.80 Cum 146.00 1 Cum
5 Granular sub-base/base/surface course with local materials (Table
400.13) by mix in place method normal Construction of granular sub-
base by providing local material spreading in uniform layers with
motor grader on prepared surface, mixing by mix in place method
with rotavator at once and compacting with smooth wheel roller to
achieve the desired density complete as per Clause 401.4 as per data- road-
Technical Specification Clause 408 MORD. Sn.76
for formation of new BT Road on both sides of median 1 x 2 1156.00 7.70 0.20 3560
3560 Cum 902.30 1 Cum
6 Providing, Laying, Spreading and compacting graded HBG crushed
stone aggregate to Wet Mix macadem specification including cost,
seignorage of all materials and including premixing the material with
water at OMC in Mechanical mix plant carriage of mixed material by
tipper to site , laying in uniform layers with paver in base courses on
well prepared surface and compacting with Vibratory roller to acheive
the desired density etc., as directed by the Engineer-in-Charge and
as per MoRT&H specification.406 (5th revision) for finished item of data- road-
work. (Payment based on levels for finished item of work) Sn.8
S No Measurements
Description Nos Qty Rate Per
LB D
for formation of Shoulders 1 x 2 1156.00 7.70 17802.40
17802.40 Sqm 33.38 1 Sqm
8 Providing and laying of Dense Graded Bituminous Macadam with
100 - 120 TPH batch type hot mix plant producing an average output
of 75 tones per hour using hard blasted granite crushed aggregates
of Grading - II as per table 500-10 of MoRT&H Specification 505
(5th revision) premixed with bituminous binder of VG 30 grade @
4.50% of weight of total mixture, transported to site, laid over a
previously prepared surface with a hydrostatic paver finisher with
sensor control to the required grade, level and alignment and rolled
as per Clauses 501.6 and 501.7 to achieve the desired compaction
for finished item of work as directed by the Engineer-in-Charge
including hire and operational charges all T&P and all other
contingent charges necessary including cost of (excluding
seigniorage) charges of all materials etc., complete in all respects as
directed by Engineer-in-Charge and as per MoRT&H specification
No. 505 (5th Revision) data- road-
Sn.14
over existing and proposed roads on left side of the meridian 1 x 2 1156.00 7.60 0.075 1317.84
1317.84 Cum 7736.39 1 Cum
9 Providing and applying tack coat with bitumen emulsion (RS-1) Bulk
using emulsion pressure distributor at the rate of 0.20 kg per sqm on
the prepared bituminous/granular surface cleaned with mechanical data- road-
Sn.10
broom as per MoRTH. specification No 503 (5th Rivision)
over existing and proposed roads on left side of the meridian 1 x 2 1156.00 7.50 17340.00
17340.00 Sqm 8.71 1 Sqm
10 Providing 25 mm thick compacted Semi-Dense Bituminous Concrete
by hot mix plant using hard blasted granite crushed aggregates of
Grading -2 as per table 500-15 of specification 508 of MoRT&H (4th
Revision), premixed with bituminous binder 60/70 grade @ 5% of mix
and filler, transporting the hot mix to work site, laying with mechanical
paver finisher to the required grade, level and alignment, rolling with
smooth wheeled,vibratory and tandem rollers to achieve the desired
compaction as per MoRT&H Specification 508 (4th Revision)
complete for finished item of work in all respects as directed by
data- road-
Engineer-in-charge.
Sn.15
over existing and proposed roads on left side of the meridian 1 x 2 1156.00 7.50 0.025 433.50
433.50 Cum 7804.55 1 Cum
447524687.xlsx - 2. BT Road-Ambedkar junction
Page 64 of 2191
S No Measurements
Description Nos Qty Rate Per
LB D
11 RBR-TSRA-12 : Road Marking with Hot Applied Thermoplastic
Compound with Reflectorising Glass Beads on Bituminous Surface :
Providing and laying of hot applied thermoplastic compound 2.5 mm
thick including reflectorising glass beads @ 250 gms per sqm area,
thickness of 2.5 mm is exclusive of surface applied glass beads as
per IRC:35 .The finished surface to be level, uniform and free from data- road-
streaks and holes as per Specification 803 MORTH Sn.77
S No Measurements
Description Nos Qty Rate Per
LB D
Say Rs.
S No Measurements
Description Nos Qty Rate Per
LB D
B Construction of Median with CRS Walls 3.00 m wide
14 BLD-CSTN-2-2(10):Earth work excavation in Ordinary soils by
Mechcanical Means-Upto 3 m depth for foundations and depositing
on bank for all lifts and with an initial lead of 10m including all
operational, incidental, labour charges such as shoring ,sheeting,
planking, strutting, etc. complete for finished item of work including
seigniorage excluding dewatering charges etc as per SS - 20 B
for construction
(APSS 308). of CRS walls on both sides of the Median 1 x 2 1156.00 0.50 0.40 462.40
462.40 Cum 105.85 1 Cum
15 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth
Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine
aggregate: coarse aggregate ) using 40mm size Hard Granite
Machine Crushed Metal including cost and conveyance of all
materials like cement, sand, coarse aggregate water etc., to site ,
seigniorage charges on all materials, labour charges , for mixing ,
laying, concrete , ramming in 15 cm layers, finishing top surface to
the required level curing etc., complete for finished item of work.for
foundation and under flooring bed.
below CC walls on both sidesof the Median 1 x 2 1156.00 0.50 0.10 115.60 Cum 3785.55 1 Cum
16 BLD-CSTN-6-5-(60) : Construction of CRS Masonary 1st Sort in
Cement Mortor ( 1:6 ) Prop using hard granite stone including cost &
Conveyance of all materials like Cement, Sand , Water, Granite
Stones, including Seigniorage Charges on all Materials, ,labour
charges for cutting Stones to required size and shape, mixing of
Cement Mortor, Construction, Scaffolding Charges curing etc.,
complete for finished item of Work .
CRS walls on both sides of the Median 0.36m below GL and 0.75m
1 x 2 1156.00 0.300 1.11 769.90 Cum 4605.86 1 Cum
above GL
17 BLD-CSTN-7-3-(74) : Providing raised or Cut Cement Pointing on
coursed or Ashlar stone masonry or concrete block walling in white
cement mortar 1 : 3 (1 white cement : 3 marble dust).including cost &
conveyance of all materials to site , seignaiorage charges on all
materials, labour charges on all materials, curing etc., Complete for
finished item of work
on outer sides of the CRS walls above GL ( 0.75 sides) 1 x 2 1156.00 0.75 1734.00 Sqm 234.88 1 Sqm
S No Measurements
Description Nos Qty Rate Per
LB D
18 BLD-CSTN-3-21 - (33) - Damp proof course 50mm thick with cement data- road-
concrete (1:2:4 Nominal mix), using 12mm hard broken stone Sn.51
aggregate including cost of all materials, seigniorage charges,
excluding conveyance charges of materials, including the cost of
machinery, labour charges, mixing, placing in position, leveling,
vibrating, curing etc. complete for finished item of work. (Using
concrete mixer)
Coping over the CRS walls 1 x 2 1156.00 0.35 809.20 Sqm 264.23 1 Sqm
19 BLD-CSTN-2-9 (17) : Filling with useful available excavated earth
(excluding rock) in trenches, sides of foundations and basement with
initial lead in layers not exceeding 15 cm thick, consolidating each
deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental,
labour charges, hire charges of T & P etc., complete for finished item data- road-
of work. (APSS NO. 309 & 310) Sn.74
for filling in side the median with available excavated earth. 1 x 1 1156.00 2.40 0.60 1664.64 Cum 29.94 1 Cum
20 Imporatation of good quality red earth congenial for plants grouth of
light textured, crystalline, porous and friable, generally acidic or
neutral but not alkaline, fertile, cost, transportation, loading,
unloading etc complete
for filling in side the median with red earth ( Top Layer) 1 x 1 1156.00 2.40 0.15 416.16 Cum 1231.59 1 Cum
21 RBR-HRTC-1: Spreading of sludge farm yard manure or/ and good
earth in required thickness (cost of sludge, farm yard manure or/and data- road-
Sn.75
good earth to be paid for separately) as per Specification 307
MORTH
Quantity as per collection 416.16 Cum 0.00 1 Cum
A. Cost of Median
Say Rs.
C Construction of CC Drain
22 BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual
Means- for structures in all types of soil as per drawing and technical
specifications and depositing on bank for all lifts and with an initial
lead of 10m including all operational, incidental, labour charges such
as shoring ,sheeting, planking, strutting, etc. complete for finished
item of work including seigniorage excluding dewatering charges etc
for CC SS
as per Drains
- 20on both sides
B (APSS of the road
308). 1 x 2 1156.00 1.10 1.05 2670.36
for RCC culverts 1 x 8 10.00 1.20 1.25 120.00
2790.36 Cum 210.92 1 Cum
S No Measurements
Description Nos Qty Rate Per
LB D
23 RBR-FNDN-4 : B-i : .Providing concrete for plain/reinforced concrete
in open foundations using 40 mm nominal size Graded hard stone
aggregate, mechanically mixed, placed in foundation and compacted
by vibration including curing for 14 days complete as per drawings
and technical specifications Clause 802, 803, 1202 & 1203 MORD
and 1500, 1700 & 2100 MORTH. : P.C.C grade M 15 (Design Mix)
MORTH 12.8 A using 40 mm Graded Metal
for CC Drains on both sides of the road 1 x 2 1156.00 1.10 0.10 254.32
for RCC culverts 1 x 8 10.00 1.20 0.15 14.40
268.72 Cum 4733.96 1 Cum
24 Vibrated cement concrete M 15 Grade Concrete using 40mm ,
20mm and 10mm size HBG crushed stone aggregate (Coarse
aggregate conforming to table 1000-1 and fine aggregate conforming
to table 1000-2) including cost and conveyance of all materials to
site and all labour charges for machine mixing,laying in position,
Compacting , Vibrating and curing including all other incidental and
all other operational charges of T&P required etc., complete as per
MoRT&H Specification 1500,1700, 2100 (5th Revision) for footings
and Raft foundation .
S No Measurements
Description Nos Qty Rate Per
LB D
26 Vibrated reinforced cement concrete M 20 grade using 20mm &
10mm HBG crushed stone aggregate (Coarse aggregate conforming
to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost, conveyance of all materials to site and labour
charges, centering, machine mixing, laying, vibrating, curing etc.,
including other incidental hire and operational charges of all T&P as
per approved drawings and as directed during execution but
excluding cost of steel and its fabrication charges for finished item as
per MoRT&H specification 1500,1600,1700 & 2200 (5th revision )
and as directed by the Engineer-in-Charge for Cover slabs over
side drains
RCC slabs over culverts 1 x 8 10.00 1.10 0.200 17.60 Cum 4488.99 1 Cum
27 Plastering in CM (1:5) 12 mm thick including cost and conveyance of
all materials , labour charges , curing etc complete for finished item
of work as directed by the Engineer -in-Charge
Drain inner walls 2 x 2 1156.00 1.600 7398.40
Drain bottom 2 x 1 1156.00 0.30 693.60
8092.00 Sqm 76.97 1 Sqm
28 BLD-CSTN-2-9 (17) : Filling with useful available excavated earth
(excluding rock) in trenches, sides of foundations and basement with
initial lead in layers not exceeding 15 cm thick, consolidating each
deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental,
labour charges, hire charges of T & P etc., complete for finished item data- road-
of work. (APSS NO. 309 & 310) Sn.74
S No Measurements
Description Nos Qty Rate Per
LB D
29 Providing HYSD bars ( Fe-415 ) of different diameters, wrought and
put up bars of all diameters including cost and conveyance of steel to
site and all labour charges for fabrication of reinforcement including
cutting, bending, binding rods, tying grills, placing them in position
etc., complete including cost and conveyance of binding wire and all
handling charges and operational charges etc., and including over
lapping welding if required etc., complete for all R.C.C items for
finished item of work as per standard drawings, as per the directions
of the Engineer-in-Charge and as per MoRT&H specification 1600 &
2200 (5th revision) and as per I.S.1786 of 1985 for Sub structure
of R.C.C items.
Steel for RCC culvert slabs @ 120Kgs for Cum of RCC 17.60 120.00 Kg/cum 2112.00 kg 56.71 1 kg
Cost of Drains
Say Rs.
D Providing Central Lighting
30 ELEC-7.2.3 : Fabrication, Transportation and supply of hot-dip
galvanized Octogonal Pole with BSEN -10025 grade S 355 JO steel
plate for shaft, IS 2062 for base plate with door opening
arrangement, including the supply of suitable boards with bakelite
sheet and MCB's as per IS specification suitable to withstand the
wind speed of 180 KMPH for 9mtrs height Pole having dimensions
Bottom 155mm, Top 70mm with 3mm thick, base plate 260 x260
x16mm and 4 Nos of M24 x 750 long 'J' bolts along with template
ofMakes: Bajaj / Valmont / TRANSRAIL 1 x 33 33 Nos #REF! 1 Nos
31 ELEC-7.3.3 : Fabrication, Transportation and supply of of
1.5mtrs sword type decorative double arm bracket with dooms
either sides complete with all accessories with MS galvanized
50mm dia Pipe.
1 x 33 33 Nos #REF! 1 Nos
32 ELEC-7.9.3 : Foundation and erection charges with special T&P, for
9.00Mtrs / 10Mtrs long Octagonal / Conical pole duly erecting on
base plate duly providing 4 Nos foundation bolts with nuts with
providing of 0.60Mtr x 0.60Mtrs x 1.40 Mtr size M20 cc work vibrated
concreting mixing with necessary steel (15kgs) reinforcement as
directed by the field engineers during execution including all labour
charges and cost and conveyance of materials etc. complete
1 x 33 33 Nos #REF! 1 Nos
S No Measurements
Description Nos Qty Rate Per
LB D
33 ELEC-4.1.10 : Supply of 10 Sqmm 4 Core XLPE insulated, 1100V
grade armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) of Makes : RPG / Finolex / Paragon / V-Guard /
Fortune Art / Suncab / Finecab / Gemscab / Payal.
4 Core 10 Sqmm 1 x 1 1155 1155 Rmt #REF! 1 Rmt
34 ELEC-4.1.12 : Supply of 16 Sqmm 4 Core XLPE insulated, 1100V
grade armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) ofMakes : RPG / Finolex / Paragon / V-Guard /
Fortune Art / Suncab / Finecab / Gemscab / Payal.
4 Core 16 Sqmm 1 x 1 83 83 Rmt #REF! 1 Rmt
35 ELEC-4.8.2 : Supply and Transportation of Outer dia 63mm and
Inner dia 51mm double walled corrugated HDPE duct made as per
specification BSEN - 500 86/IS 14930 Part-II. Makes:DURA LINE
(Dura Guard) or its equivalent make.
51mm dia DWC pipe 1 x 1 1155 1155 Rmt #REF! 1 Rmt
S No Measurements
Description Nos Qty Rate Per
LB D
36 Supply and erection of the feeder pillar box of MS sheet of 14 SWG
110 X 700 X 250 mm in size and painted with 2 coats of red oxide
and two coats of synthetic enamel paint of light gray shade (or power
coated). The FPB should be out door type, dust and vermin proof,
confirming to IP – 55 degree of protection as per IS – 2147. The
inner door of the box should be having an interlocking arrangement.
Single compression cable glands and crimping type lugs shall be
carried out with copper standard conductor, flexible PVC insulated
1100
a) OutVdoor
grade wire.
with The FPBhinges
concealed shouldandconsists the following.
neoprene sponge gasket.
b) Hinged inner door.
c) MS bracket for pad locking facility with Canopy.
d) 3 Nos siemen’s type door lock with key on outer door.
e) Dancer notice plate.
f) MS base channel 50 x 50 x 3 mm thick and 2 Nos thumb screws.
g)1 No Micro processed based electronic timer.
h) 3 Nos 63 A HRC fuses EE or equivalent make. LS
k) 4 Nos 60 A TPN MCB’s as out going MDS / Havell’s
l) 4 Nos 25 x 6mm thick alluminium bus bars for R.Y.B phases and
neutral mounted rigidly on suitable insulators.
m)1 No 110 A Contactor (ML – 6) L&T make.
n) 1 No kaycee make auto / mannual switch.
o) Removable undrilled MS painted cable gland plate.
p) MS base plate for mounting switch gear components.
q) 4 Nos foundation holes in base channel to suit M 12 foundation
bolts.
r) 4 Nos 4 way terminal blocks for outgoing cricuits open barrier type
balson / Everest / Essen or equivalent make (1 No. 100 A four way
terminal block for incoming open barriers type or balson / everest /
essen or equivalent make.
s) 2 Nos earthing studs (M10) with nut and spring washer etc,.
3 Core x 2.5 Sqmm FRLS armoured copper cabl 1 x 1 743 743 Rmt #REF! 1 Rmt
38 ELEC-4.4.1 : Supply and fixing of crimping type copper lugs
confirming to I.S specifications for cable upto 16 Sq.mm including
nuts and bolts with connections
Copper lugs 1 x 264 264 Nos #REF! 1 Nos
447524687.xlsx - 2. BT Road-Ambedkar junction
Page 73 of 2191
S No Measurements
Description Nos Qty Rate Per
LB D
39 ELEC-4.3.5 : Supply and Fixing of single compression brass cable
glands for 4 core XLPE armoured cable up to 16.0 Sq.mm with
brass washers complete.
Brass cable glands 1 x 4 4 Nos #REF! 1 Nos
40 ELEC-9.1.56 : Supply and laying of 40mm Nominal Bore medium
grade G.I.Pipe including cost and conveyance etc, complete.
40mm Nominal Bore medium grade G.I.Pipe 1 x 1 66 66 Rmt #REF! 1 Rmt
41 ELEC-3.5.1: Supply & Installtion of Automatic Street Light Control
System with Optical Sensor, Low volatage / High voltage trip and
reset, operating voltage 150 - 280V AC, 50 HZ with suitable SMC
enclousure of IP 54 protection, MCBs and contactor suitable to
control the load of 3 KW of single phase load with necessary
clamping arrangements. Makes : Swadeep Nature Switch / Light
Mate. 1 x 1 1 No #REF! 1 No
42 BLD-ELEC-5-1-1 : Providing independent earthing for sophisticated
equipment like computer medical Equipment, Electronic Gadgets
etc., with 600mm x 600mm x3.15 mm thick copper plate rigidly fixed
to the 40mm dia GI pipe of 2.5 Mtrs. Length and 19mm dia ‘B’ class
GI pipe of 0.3 M long connected with reducer providing GI funnel
covers with wire mesh of suitable size staggered holes of 16 Nos of
12mm dia to the earht electrode, enclosed in a CC chamber of
400mm x 400mm x 400mm covered with reinforced cement concrete
cover and all labour charges RCC slab cover duly filing salt and
charcoal in layers from the bottom of the earth pit, giving earth
connections from the electrodes to GI strip 25 x 6 x 200mm length 1 x 2 2 Nos 3906.33 1 Nos
provided with holes GI washers, boths and labour charges etc.,
43 BLD-ELEC-7-4-2 : Supply and erection of Integral street light
complete.
luminaire of 150W MH lamp fitting comprises of single piece die cast
Aluminium body with copper wound ballast and capacitor, Ignitor,
with pot optics including 150W MH lamp etc., complete.
150W MH lamps 2 x 33 66 Nos 5538.73 1 Nos
44 Laying of PVC armoured under ground cable in existing duct as
directed by the department including cost and conveyance of all
materials and labour charges etc., complete.
Armoured cable 1 x 1 1271 1271 Rmt 15.00 1 Rmt
45 Laying of 63mm and Inner dia 51 mm double walled corrugated
HDPE as directed by the department including cost and conveyance
of all materials and labour charges etc., complete.
Laying DWC pipe in Median 1 x 1 1155 1155 Rmt 15.00 1 Rmt
S No Measurements
Description Nos Qty Rate Per
LB D
46 Supply of 6-32A !OKA SP MCB, C/D Curve ISI Mark. Makes :
Legrand- DX3 / Schneider-Acti9 / Siemens / L&T / Exora. As per SSR
No: ELEC2.9.1,
Supply of 63A 4 SI.
Way No: 282
Connector 1 x 66 66 Nos #REF! 1 Nos
47 Supply and Run of No.8 SWG G.1 wire including cost of all
accessories and labour charges etc., complete .
1 x 297 297 Rmt #REF! 1 Rmt
48 Fabrication supply and errection of water tight M.S junction Box 260
x 300 x 140 mm (depth) size and 16 guage MS sheet with fixing
arrangements, with necessary holes for cable entry and exit from the
box. The box shall be provided with cover and hinges on one side
and bolting at other end. The box shall be fixed by clamps fabricated
from 25mm x 3mm MS flat. The box consisting of 2 Nos of MCB and
1 No of 60 AMPS ‘L’ way consider doubl arm and box shall be
painted with one coat of Red Oxide and two coats aluminium paint
including transportation etc., complete for finished item of work. 1 x 3 3 Nos 5751.83 1 No
Total Amount Rs.
Say
Total of A+B+C+D
Say
nd Side drains
Amount
315896.00
#REF!
#REF!
Amount
514767.00
3212621.00
8897951.00
Amount
594244.00
10195324.00
151031.00
3383272.00
447524687.xlsx - 2. BT Road-Ambedkar junction
Page 78 of 2191
Amount
481296.00
2922196.00
31448.00
#REF!
Amount
#REF!
Amount
48945.00
437610.00
3546052.00
407282.00
Amount
213815.00
49839.00
512538.00
0.00
5216081.00
52.16 Lakhs
588543.00
Amount
1272110.00
959048.00
3296145.00
Amount
79006.00
622841.00
25067.00
Amount
119772.00
6962532.00
69.63 Lakhs
#REF!
#REF!
#REF!
Amount
#REF!
#REF!
#REF!
Amount
64000.00
#REF!
#REF!
447524687.xlsx - 2. BT Road-Ambedkar junction
Page 87 of 2191
Amount
#REF!
#REF!
#REF!
7812.66
365556.18
19065.00
17325.00
Amount
#REF!
#REF!
17255.49
#REF!
#REF!
#REF!
#REF!
KODADA MUNICIPALITY
Improvement of Two Lane Road at NH-16 to Housing Board Colony park with Central Lighting, Median and Side drains
S No Measurements
Description Nos Qty Rate Per
LB D
A Formation of BT Road
* Total Earth work excavation quantity including Rock for sectioning
and levelling the ground along the alignment. as per LS
1 x 1 1098.00 18.00 0.200 3952.80 Cum
1 Earthwork excavation in soils upto SDR by mechanical means
including trimming bottom and side slopes in accordance with
requirements of lines , grades and cross sections etc., complete for
finished item of work for trench cutting as per MoRT&H specification data-
301(5th Revision) and as directed by the Engineer-in-Charge MoRTH--Sn.3
EWE in ordinary soils for levelling the land along the alignment - 80% 3162 Cum 56.00 1 Cum
2 Excavation for roadway in ordinary rock with hydraulic excavator of
0.9 cum bucket capacity including cutting and loading in tippers,
transporting to embankment site with all lifts and lead beyond 100 m
& upto 1000 m, trimming bottom and side slopes in accordance with
requirements of lines, grades and cross-sections as per Technical
Specification Clause 302.3.5 MORD / 301 MORTH
EWE in rocky soils- ordinary rock by Hydraulic excavator 15% 593 Cum #REF! 1 Cum
3 Excavation for roadway in hard rock (blasting prohibited) with rock
breakers including breaking rock, loading in tippers and disposal with
initial lift of 3 mts and lead upto 1000 metres, trimming bottom and
side slopes in accordance with requirements of lines, grades and
cross- sections as per Technical Specification Clause 302.3.5
MORD / 301 MORTH
EWE in in hard rock requiring blasting by mechanical means 5% 198 Cum #REF! 1 Cum
S No Measurements
Description Nos Qty Rate Per
LB D
4
Forming embankment with Side earth by mechanical means upto
SDR including pre-watering of soil , removal of top soil, excavation of
soils , depositing the soils on the embankment, spreading soil,
breaking clods, sectioning , grading and consolidation with 8 to 10
Tonnes Vibratory Road Roller @ OMC to meet requirement of table
300-2 of MoRT&H, including all hire and operational charges of
T&P, complete for finished item of work as per MoRT&H
specification 305 (5th revision) (Payment will be made based on
level for finished item of work).
Total Filling Quantity 1 x 1 1098.00 18.00 0.100 1976.40 Cum 146.00 1 Cum
5 Granular sub-base/base/surface course with local materials (Table
400.13) by mix in place method normal Construction of granular sub-
base by providing local material spreading in uniform layers with
motor grader on prepared surface, mixing by mix in place method
with rotavator at once and compacting with smooth wheel roller to
achieve the desired density complete as per Clause 401.4 as per data- road-
Technical Specification Clause 408 MORD. Sn.76
for formation of new BT Road on both sides of median 1 x 2 1098.00 5.70 0.20 2503
2503 Cum 902.30 1 Cum
6 Providing, Laying, Spreading and compacting graded HBG crushed
stone aggregate to Wet Mix macadem specification including cost,
seignorage of all materials and including premixing the material with
water at OMC in Mechanical mix plant carriage of mixed material by
tipper to site , laying in uniform layers with paver in base courses on
well prepared surface and compacting with Vibratory roller to acheive
the desired density etc., as directed by the Engineer-in-Charge and
as per MoRT&H specification.406 (5th revision) for finished item of data- road-
work. (Payment based on levels for finished item of work) Sn.8
S No Measurements
Description Nos Qty Rate Per
LB D
for formation of Shoulders 1 x 2 1098.00 5.70 12517.20
12517.20 Sqm 33.38 1 Sqm
8 Providing and laying of Dense Graded Bituminous Macadam with
100 - 120 TPH batch type hot mix plant producing an average output
of 75 tones per hour using hard blasted granite crushed aggregates
of Grading - II as per table 500-10 of MoRT&H Specification 505
(5th revision) premixed with bituminous binder of VG 30 grade @
4.50% of weight of total mixture, transported to site, laid over a
previously prepared surface with a hydrostatic paver finisher with
sensor control to the required grade, level and alignment and rolled
as per Clauses 501.6 and 501.7 to achieve the desired compaction
for finished item of work as directed by the Engineer-in-Charge
including hire and operational charges all T&P and all other
contingent charges necessary including cost of (excluding
seigniorage) charges of all materials etc., complete in all respects as
directed by Engineer-in-Charge and as per MoRT&H specification
No. 505 (5th Revision) data- road-
Sn.14
over existing and proposed roads on left side of the meridian 1 x 2 1098.00 5.60 0.075 922.32
922.32 Cum 7736.39 1 Cum
9 Providing and applying tack coat with bitumen emulsion (RS-1) Bulk
using emulsion pressure distributor at the rate of 0.20 kg per sqm on
the prepared bituminous/granular surface cleaned with mechanical data- road-
Sn.10
broom as per MoRTH. specification No 503 (5th Rivision)
over existing and proposed roads on left side of the meridian 1 x 2 1098.00 5.50 12078.00
12078.00 Sqm 8.71 1 Sqm
10 Providing 25 mm thick compacted Semi-Dense Bituminous Concrete
by hot mix plant using hard blasted granite crushed aggregates of
Grading -2 as per table 500-15 of specification 508 of MoRT&H (4th
Revision), premixed with bituminous binder 60/70 grade @ 5% of mix
and filler, transporting the hot mix to work site, laying with mechanical
paver finisher to the required grade, level and alignment, rolling with
smooth wheeled,vibratory and tandem rollers to achieve the desired
compaction as per MoRT&H Specification 508 (4th Revision)
complete for finished item of work in all respects as directed by
data- road-
Engineer-in-charge.
Sn.15
over existing and proposed roads on left side of the meridian 1 x 2 1098.00 5.50 0.025 301.95
301.95 Cum 7804.55 1 Cum
447524687.xlsx - 3. BT Road-2 lane-HB Colony
Page 92 of 2191
S No Measurements
Description Nos Qty Rate Per
LB D
11 RBR-TSRA-12 : Road Marking with Hot Applied Thermoplastic
Compound with Reflectorising Glass Beads on Bituminous Surface :
Providing and laying of hot applied thermoplastic compound 2.5 mm
thick including reflectorising glass beads @ 250 gms per sqm area,
thickness of 2.5 mm is exclusive of surface applied glass beads as
per IRC:35 .The finished surface to be level, uniform and free from data- road-
streaks and holes as per Specification 803 MORTH Sn.77
S No Measurements
Description Nos Qty Rate Per
LB D
Say Rs.
S No Measurements
Description Nos Qty Rate Per
LB D
B Construction of Median with CRS Walls 2.00 m wide
14 BLD-CSTN-2-2(10):Earth work excavation in Ordinary soils by
Mechcanical Means-Upto 3 m depth for foundations and depositing
on bank for all lifts and with an initial lead of 10m including all
operational, incidental, labour charges such as shoring ,sheeting,
planking, strutting, etc. complete for finished item of work including
seigniorage excluding dewatering charges etc as per SS - 20 B
for construction
(APSS 308). of CRS walls on both sides of the Median 1 x 2 1098.00 0.50 0.40 439.20
439.20 Cum 105.85 1 Cum
15 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth
Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine
aggregate: coarse aggregate ) using 40mm size Hard Granite
Machine Crushed Metal including cost and conveyance of all
materials like cement, sand, coarse aggregate water etc., to site ,
seigniorage charges on all materials, labour charges , for mixing ,
laying, concrete , ramming in 15 cm layers, finishing top surface to
the required level curing etc., complete for finished item of work.for
foundation and under flooring bed.
below CC walls on both sidesof the Median 1 x 2 1098.00 0.50 0.10 109.80 Cum 3785.55 1 Cum
16 BLD-CSTN-6-5-(60) : Construction of CRS Masonary 1st Sort in
Cement Mortor ( 1:6 ) Prop using hard granite stone including cost &
Conveyance of all materials like Cement, Sand , Water, Granite
Stones, including Seigniorage Charges on all Materials, ,labour
charges for cutting Stones to required size and shape, mixing of
Cement Mortor, Construction, Scaffolding Charges curing etc.,
complete for finished item of Work .
CRS walls on both sides of the Median 0.36m below GL and 0.75m
1 x 2 1098.00 0.300 1.11 731.27 Cum 4605.86 1 Cum
above GL
17 BLD-CSTN-7-3-(74) : Providing raised or Cut Cement Pointing on
coursed or Ashlar stone masonry or concrete block walling in white
cement mortar 1 : 3 (1 white cement : 3 marble dust).including cost &
conveyance of all materials to site , seignaiorage charges on all
materials, labour charges on all materials, curing etc., Complete for
finished item of work
on outer sides of the CRS walls above GL ( 0.75 sides) 1 x 2 1098.00 0.75 1647.00 Sqm 234.88 1 Sqm
S No Measurements
Description Nos Qty Rate Per
LB D
18 BLD-CSTN-3-21 - (33) - Damp proof course 50mm thick with cement data- road-
concrete (1:2:4 Nominal mix), using 12mm hard broken stone Sn.51
aggregate including cost of all materials, seigniorage charges,
excluding conveyance charges of materials, including the cost of
machinery, labour charges, mixing, placing in position, leveling,
vibrating, curing etc. complete for finished item of work. (Using
concrete mixer)
Coping over the CRS walls 1 x 2 1098.00 0.35 768.60 Sqm 264.23 1 Sqm
19 BLD-CSTN-2-9 (17) : Filling with useful available excavated earth
(excluding rock) in trenches, sides of foundations and basement with
initial lead in layers not exceeding 15 cm thick, consolidating each
deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental,
labour charges, hire charges of T & P etc., complete for finished item data- road-
of work. (APSS NO. 309 & 310) Sn.74
for filling in side the median with available excavated earth. 1 x 1 1098.00 1.40 0.60 922.32 Cum 29.94 1 Cum
20 Imporatation of good quality red earth congenial for plants grouth of
light textured, crystalline, porous and friable, generally acidic or
neutral but not alkaline, fertile, cost, transportation, loading,
unloading etc complete
for filling in side the median with red earth ( Top Layer) 1 x 1 1098.00 1.40 0.15 230.58 Cum 1231.59 1 Cum
21 RBR-HRTC-1: Spreading of sludge farm yard manure or/ and good
earth in required thickness (cost of sludge, farm yard manure or/and data- road-
Sn.75
good earth to be paid for separately) as per Specification 307
MORTH
Quantity as per collection 230.58 Cum 0.00 1 Cum
A. Cost of Median
Say Rs.
C Construction of CC Drain
22 BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual
Means- for structures in all types of soil as per drawing and technical
specifications and depositing on bank for all lifts and with an initial
lead of 10m including all operational, incidental, labour charges such
as shoring ,sheeting, planking, strutting, etc. complete for finished
item of work including seigniorage excluding dewatering charges etc
for CC SS
as per Drains
- 20on both sides
B (APSS of the road
308). 1 x 2 1098.00 1.10 1.05 2536.38
for RCC culverts 1 x 8 10.00 1.20 1.25 120.00
2656.38 Cum 210.92 1 Cum
S No Measurements
Description Nos Qty Rate Per
LB D
23 RBR-FNDN-4 : B-i : .Providing concrete for plain/reinforced concrete
in open foundations using 40 mm nominal size Graded hard stone
aggregate, mechanically mixed, placed in foundation and compacted
by vibration including curing for 14 days complete as per drawings
and technical specifications Clause 802, 803, 1202 & 1203 MORD
and 1500, 1700 & 2100 MORTH. : P.C.C grade M 15 (Design Mix)
MORTH 12.8 A using 40 mm Graded Metal
for CC Drains on both sides of the road 1 x 2 1098.00 1.10 0.10 241.56
for RCC culverts 1 x 8 10.00 1.20 0.15 14.40
255.96 Cum 4733.96 1 Cum
24 Vibrated cement concrete M 15 Grade Concrete using 40mm ,
20mm and 10mm size HBG crushed stone aggregate (Coarse
aggregate conforming to table 1000-1 and fine aggregate conforming
to table 1000-2) including cost and conveyance of all materials to
site and all labour charges for machine mixing,laying in position,
Compacting , Vibrating and curing including all other incidental and
all other operational charges of T&P required etc., complete as per
MoRT&H Specification 1500,1700, 2100 (5th Revision) for footings
and Raft foundation .
S No Measurements
Description Nos Qty Rate Per
LB D
26 Vibrated reinforced cement concrete M 20 grade using 20mm &
10mm HBG crushed stone aggregate (Coarse aggregate conforming
to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost, conveyance of all materials to site and labour
charges, centering, machine mixing, laying, vibrating, curing etc.,
including other incidental hire and operational charges of all T&P as
per approved drawings and as directed during execution but
excluding cost of steel and its fabrication charges for finished item as
per MoRT&H specification 1500,1600,1700 & 2200 (5th revision )
and as directed by the Engineer-in-Charge for Cover slabs over
side drains
RCC slabs over culverts 1 x 8 10.00 1.10 0.200 17.60 Cum 4488.99 1 Cum
27 Plastering in CM (1:5) 12 mm thick including cost and conveyance of
all materials , labour charges , curing etc complete for finished item
of work as directed by the Engineer -in-Charge
Drain inner walls 2 x 2 1098.00 1.600 7027.20
Drain bottom 2 x 1 1098.00 0.30 658.80
7686.00 Sqm 76.97 1 Sqm
28 BLD-CSTN-2-9 (17) : Filling with useful available excavated earth
(excluding rock) in trenches, sides of foundations and basement with
initial lead in layers not exceeding 15 cm thick, consolidating each
deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental,
labour charges, hire charges of T & P etc., complete for finished item data- road-
of work. (APSS NO. 309 & 310) Sn.74
S No Measurements
Description Nos Qty Rate Per
LB D
29 Providing HYSD bars ( Fe-415 ) of different diameters, wrought and
put up bars of all diameters including cost and conveyance of steel to
site and all labour charges for fabrication of reinforcement including
cutting, bending, binding rods, tying grills, placing them in position
etc., complete including cost and conveyance of binding wire and all
handling charges and operational charges etc., and including over
lapping welding if required etc., complete for all R.C.C items for
finished item of work as per standard drawings, as per the directions
of the Engineer-in-Charge and as per MoRT&H specification 1600 &
2200 (5th revision) and as per I.S.1786 of 1985 for Sub structure
of R.C.C items.
Steel for RCC culvert slabs @ 120Kgs for Cum of RCC 17.60 120.00 Kg/cum 2112.00 kg 56.71 1 kg
Cost of Drains
Say Rs.
D Providing Central Lighting
30 ELEC-7.2.3 : Fabrication, Transportation and supply of hot-dip
galvanized Octogonal Pole with BSEN -10025 grade S 355 JO steel
plate for shaft, IS 2062 for base plate with door opening
arrangement, including the supply of suitable boards with bakelite
sheet and MCB's as per IS specification suitable to withstand the
wind speed of 180 KMPH for 9mtrs height Pole having dimensions
Bottom 155mm, Top 70mm with 3mm thick, base plate 260 x260
x16mm and 4 Nos of M24 x 750 long 'J' bolts along with template
ofMakes: Bajaj / Valmont / TRANSRAIL 1 x 31 31 Nos #REF! 1 Nos
31 ELEC-7.3.3 : Fabrication, Transportation and supply of of
1.5mtrs sword type decorative double arm bracket with dooms
either sides complete with all accessories with MS galvanized
50mm dia Pipe.
1 x 31 31 Nos #REF! 1 Nos
32 ELEC-7.9.3 : Foundation and erection charges with special T&P, for
9.00Mtrs / 10Mtrs long Octagonal / Conical pole duly erecting on
base plate duly providing 4 Nos foundation bolts with nuts with
providing of 0.60Mtr x 0.60Mtrs x 1.40 Mtr size M20 cc work vibrated
concreting mixing with necessary steel (15kgs) reinforcement as
directed by the field engineers during execution including all labour
charges and cost and conveyance of materials etc. complete
1 x 31 31 Nos #REF! 1 Nos
S No Measurements
Description Nos Qty Rate Per
LB D
33 ELEC-4.1.10 : Supply of 10 Sqmm 4 Core XLPE insulated, 1100V
grade armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) of Makes : RPG / Finolex / Paragon / V-Guard /
Fortune Art / Suncab / Finecab / Gemscab / Payal.
4 Core 10 Sqmm 1 x 1 1085 1085 Rmt #REF! 1 Rmt
34 ELEC-4.1.12 : Supply of 16 Sqmm 4 Core XLPE insulated, 1100V
grade armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) ofMakes : RPG / Finolex / Paragon / V-Guard /
Fortune Art / Suncab / Finecab / Gemscab / Payal.
4 Core 16 Sqmm 1 x 1 78 78 Rmt #REF! 1 Rmt
35 ELEC-4.8.2 : Supply and Transportation of Outer dia 63mm and
Inner dia 51mm double walled corrugated HDPE duct made as per
specification BSEN - 500 86/IS 14930 Part-II. Makes:DURA LINE
(Dura Guard) or its equivalent make.
51mm dia DWC pipe 1 x 1 1085 1085 Rmt #REF! 1 Rmt
S No Measurements
Description Nos Qty Rate Per
LB D
36 Supply and erection of the feeder pillar box of MS sheet of 14 SWG
110 X 700 X 250 mm in size and painted with 2 coats of red oxide
and two coats of synthetic enamel paint of light gray shade (or power
coated). The FPB should be out door type, dust and vermin proof,
confirming to IP – 55 degree of protection as per IS – 2147. The
inner door of the box should be having an interlocking arrangement.
Single compression cable glands and crimping type lugs shall be
carried out with copper standard conductor, flexible PVC insulated
1100
a) OutVdoor
grade wire.
with The FPBhinges
concealed shouldandconsists the following.
neoprene sponge gasket.
b) Hinged inner door.
c) MS bracket for pad locking facility with Canopy.
d) 3 Nos siemen’s type door lock with key on outer door.
e) Dancer notice plate.
f) MS base channel 50 x 50 x 3 mm thick and 2 Nos thumb screws.
g)1 No Micro processed based electronic timer.
h) 3 Nos 63 A HRC fuses EE or equivalent make. LS
k) 4 Nos 60 A TPN MCB’s as out going MDS / Havell’s
l) 4 Nos 25 x 6mm thick alluminium bus bars for R.Y.B phases and
neutral mounted rigidly on suitable insulators.
m)1 No 110 A Contactor (ML – 6) L&T make.
n) 1 No kaycee make auto / mannual switch.
o) Removable undrilled MS painted cable gland plate.
p) MS base plate for mounting switch gear components.
q) 4 Nos foundation holes in base channel to suit M 12 foundation
bolts.
r) 4 Nos 4 way terminal blocks for outgoing cricuits open barrier type
balson / Everest / Essen or equivalent make (1 No. 100 A four way
terminal block for incoming open barriers type or balson / everest /
essen or equivalent make.
s) 2 Nos earthing studs (M10) with nut and spring washer etc,.
3 Core x 2.5 Sqmm FRLS armoured copper cabl 1 x 1 698 698 Rmt #REF! 1 Rmt
38 ELEC-4.4.1 : Supply and fixing of crimping type copper lugs
confirming to I.S specifications for cable upto 16 Sq.mm including
nuts and bolts with connections
Copper lugs 1 x 248 248 Nos #REF! 1 Nos
447524687.xlsx - 3. BT Road-2 lane-HB Colony
Page 101 of 2191
S No Measurements
Description Nos Qty Rate Per
LB D
39 ELEC-4.3.5 : Supply and Fixing of single compression brass cable
glands for 4 core XLPE armoured cable up to 16.0 Sq.mm with
brass washers complete.
Brass cable glands 1 x 4 4 Nos #REF! 1 Nos
40 ELEC-9.1.56 : Supply and laying of 40mm Nominal Bore medium
grade G.I.Pipe including cost and conveyance etc, complete.
40mm Nominal Bore medium grade G.I.Pipe 1 x 1 62 62 Rmt #REF! 1 Rmt
41 ELEC-3.5.1: Supply & Installtion of Automatic Street Light Control
System with Optical Sensor, Low volatage / High voltage trip and
reset, operating voltage 150 - 280V AC, 50 HZ with suitable SMC
enclousure of IP 54 protection, MCBs and contactor suitable to
control the load of 3 KW of single phase load with necessary
clamping arrangements. Makes : Swadeep Nature Switch / Light
Mate. 1 x 1 1 No #REF! 1 No
42 BLD-ELEC-5-1-1 : Providing independent earthing for sophisticated
equipment like computer medical Equipment, Electronic Gadgets
etc., with 600mm x 600mm x3.15 mm thick copper plate rigidly fixed
to the 40mm dia GI pipe of 2.5 Mtrs. Length and 19mm dia ‘B’ class
GI pipe of 0.3 M long connected with reducer providing GI funnel
covers with wire mesh of suitable size staggered holes of 16 Nos of
12mm dia to the earht electrode, enclosed in a CC chamber of
400mm x 400mm x 400mm covered with reinforced cement concrete
cover and all labour charges RCC slab cover duly filing salt and
charcoal in layers from the bottom of the earth pit, giving earth
connections from the electrodes to GI strip 25 x 6 x 200mm length 1 x 2 2 Nos 3906.33 1 Nos
provided with holes GI washers, boths and labour charges etc.,
43 BLD-ELEC-7-4-2 : Supply and erection of Integral street light
complete.
luminaire of 150W MH lamp fitting comprises of single piece die cast
Aluminium body with copper wound ballast and capacitor, Ignitor,
with pot optics including 150W MH lamp etc., complete.
150W MH lamps 2 x 31 62 Nos 5538.73 1 Nos
44 Laying of PVC armoured under ground cable in existing duct as
directed by the department including cost and conveyance of all
materials and labour charges etc., complete.
Armoured cable 1 x 1 1194 1194 Rmt 15.00 1 Rmt
45 Laying of 63mm and Inner dia 51 mm double walled corrugated
HDPE as directed by the department including cost and conveyance
of all materials and labour charges etc., complete.
Laying DWC pipe in Median 1 x 1 1085 1085 Rmt 15.00 1 Rmt
S No Measurements
Description Nos Qty Rate Per
LB D
46 Supply of 6-32A !OKA SP MCB, C/D Curve ISI Mark. Makes :
Legrand- DX3 / Schneider-Acti9 / Siemens / L&T / Exora. As per SSR
No: ELEC2.9.1,
Supply of 63A 4 SI.
Way No: 282
Connector 1 x 62 62 Nos #REF! 1 Nos
47 Supply and Run of No.8 SWG G.1 wire including cost of all
accessories and labour charges etc., complete .
1 x 279 279 Rmt #REF! 1 Rmt
48 Fabrication supply and errection of water tight M.S junction Box 260
x 300 x 140 mm (depth) size and 16 guage MS sheet with fixing
arrangements, with necessary holes for cable entry and exit from the
box. The box shall be provided with cover and hinges on one side
and bolting at other end. The box shall be fixed by clamps fabricated
from 25mm x 3mm MS flat. The box consisting of 2 Nos of MCB and
1 No of 60 AMPS ‘L’ way consider doubl arm and box shall be
painted with one coat of Red Oxide and two coats aluminium paint
including transportation etc., complete for finished item of work. 1 x 3 3 Nos 5751.83 1 No
Total Amount Rs.
Say
Total of A+B+C+D
Say
Amount
177072.00
#REF!
#REF!
Amount
288554.00
2258854.00
6256316.00
Amount
417824.00
7135427.00
105199.00
2356584.00
447524687.xlsx - 3. BT Road-2 lane-HB Colony
Page 106 of 2191
Amount
453244.00
2777087.00
29870.00
#REF!
Amount
#REF!
Amount
46489.00
415653.00
3368127.00
386847.00
Amount
203087.00
27614.00
283980.00
0.00
4731797.00
47.32 Lakhs
560284.00
Amount
1211704.00
913528.00
3137265.00
Amount
79006.00
591591.00
23869.00
Amount
119772.00
6637019.00
66.37 Lakhs
#REF!
#REF!
#REF!
Amount
#REF!
#REF!
#REF!
Amount
64000.00
#REF!
#REF!
447524687.xlsx - 3. BT Road-2 lane-HB Colony
Page 115 of 2191
Amount
#REF!
#REF!
#REF!
7812.66
343401.26
17910.00
16275.00
Amount
#REF!
#REF!
17255.49
#REF!
#REF!
#REF!
#REF!
Development of Roads and Providing Central Lighting under TUFIDC Assistance in Kodada Municip
Probable
S.No Description of Item Rate UOP
Qty
Quantity UOM
(I)Laying of BT Roads, including traffic sign,
marking and other appurenaces at various
localities
Excavation for roadwork in soil with hydraulic
excavator of 0.9 cum bucket capacity including
cutting and loading in tippers, trimming bottom and
side slopes, in accordance with requirements of lines,
1 26077.37 Cum grades and cross-sections, and transporting to the 84.62 Cum
embankment location with all lifts and lead upto 1000
m as per Technical Specification Clause 302.3 MORD
/ 301 MORTH
Construction of Culvert
RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00
Mts depth below GL by Manual means: Earthwork
excavation in all kinds of soil for Pipe line trenches as
per drawings and technical specifications including
setting out, construction of shoring and bracing,
removal of stumps and other deleterious material ,
dressing of sides and bottom as per Technical
Specification 305 MoRD / 304 MoRTH and as
directed by the departmental officer including
protecting the existing utility services wherever it is
11 581.18 cum possible during the execution and taking all 210.92 cum
precautionary measures in the restricted areas for
laying sewer/water pipe lines including divertion of
traffic and backfilling in trenches with excavated
suitable material and disposal of remaining earth
upto a lead of 50 m, including all incidental and
operational charges etc., complete by manual
means.
b) Cautionary signs
Providing and fixing Cautionary / Warning sign boards
size 900 mm equilateral triangle made out of Type –
XI of ASTMD 4956-09 wide angle cube cornered
micro Prismatic Retro reflective sheeting and
confirming to IRC 67:2012 for full background of
White colour and letters/logos
done by screen printing in Black colour, boarders by
screen printing in Red colour and fixed over 4MM
Aluminium Composite Material sheet having minimum
0.5 mm thick Aluminium skin on both sides with back
side painted grey colour and fixed over back support
frame of M.S angle 25x25x3mm all round and fixing
with 35x35x4mm and mounted on a MS angle post of
size 75x75x6mm with clear height of not less than 2.1
m from the ground level to the bottom of the board.
25 10.00 No The signpost should be painted with one coat of red 6226.00 No
oxide paint and 2 coats of synthetic enamel paint
Black and White colour with bands of 30cm of height.
The signpost shall be firmly fixed with MS base angle
35x35x4 mm in to the ground by M-15 Concrete
foundation of size 450x450x600mm including cost
and conveyance of all materials ,equipment,
machinery and labour with all leads and lift, loading
chages necessary for satisfactory completion of the
work as directed by Engineer -in-Charge.
Supplying and installation of Hazard Marker using
M.S. angle of size 55x55x6mm and 120cm high
above ground level painted with two coats of black &
white stripes of 15cm wide with firstquality synthetic
enamel paint over one coat of appropriate primer of
approvedbrand,colour, with 30cm x 90cm Type – XI of
ASTMD 4956-09 wide angle cube cornered micro
Prismatic Retro reflective sheeting of Yellow colour
and confirming to IRC 67:2012 fixed over 3MM
Alluminium Composite Material having minimum 0.30
mm thick Aluminium skin on both sides with standard
supports consisting of alternately black and Yellow
with black stripes in screen printing sloping downward
at an angle of 45 degrees towards the side of the
obstruction onwhich the traffic is to pass and buried
26 6.00 No into the ground in a trench of size 30cm x 30cm and 4003.00 No
50cm depth filled with CC M-20 including cost and
conveyance of all materials, equipment, machinery
and labour with all leads and lifts, loading and un-
loading charges necessary for successfull completion
of the work on any road in division as directed by
Engineer-in-Charge andconforming to IRC 67-2012
&MORT&H specification No.805 and approved
drawings etc., complete for finished item of work.
Amount
2,206,667.05
1459435.50
939306.15
13106131.27
22109635.15
1171278.95
439112.95
22437682.26
15202737.61
283683.40
122581.43
10544.00
25400.16
88996.03
459323.28
1041723.24
269350.92
1285701.52
12761.28
62801.77
13835.22
547258.74
161988.00
22296.00
62260.00
24018.00
45200.00
20676.00
184920.00
1801200.00
3580022.88
119591.64
4463632.52
19750143.23
4200547.68
355320.00
1180683.00
7631120.66
2288070.16
2848784.50
13549352.80
806121.20
149238.80
1759349.64
411492.20
199962.40
429938.87
1891021.20
551667.80
87273.44
197193.08
42506.40
161922.32
18085.12
31918.66
777216.83
697341.12
2825993.88
48801.48
20351.30
4013.32
2360.19
8631.72
35767.91
63256.88
4450.51
3239.55
13348.15
3251.65
4236.97
261540.80
2588836.39
3205028.37
1774688.00
420592.50
313456.50
480748.00
631522.70
166512140.80
19981457.00
166512.00
1665121.00
832561.00
832561.00
3330243.00
3330243.00
166512.00
30305210.00
196817350.80
1355742.00
500000.00
426907.20
2282649.2
199100000.00
1991.00 Lakhs
Page 153 of 2191 General Abstract
Kodada Municipality
Development of Roads and Providing Central Lighting under TUFIDC Assistance in
Kodada Municipality
GENERAL ABSTRACT
S.No Description of Items Quantity Amount in Rs.
1 Laying of BT Roads, at various localities 8530 Rmt 85618505.88
4 Widening of Existing BT Road with CC Road on Both Sides in 1640 Rmt 4401623.27
Kattakommu Gudem Road
5 Junction improvements at Khammam cross road and Rajiv 2 Nos 142556.85
chowk
6 Providing Footpaths in various roads 3100 Rmt 9676413.26
The govt. Vide Go.MS. No-495 Dept, Dt: 25.06.2018 of MA & UD Department have accorded
permission to TUFIDC for an amount of Rs.2500.00 lakhs to Kodad Municipality for taken up
1 infrastructure development works with funding pattern from TUFIDC grants as per the guide
lines in GO.MS.No51 MA & UD Dept. Dt:13.03.2018.
3 Revised Technical Sanction is accorded for the above work for an aamount of Rs. 1991.00
Lakhs and registered under ENC (PH) R.No:94/2018-19; Dt 5/10/2018 in supercession of
TS.No.ENC.R.No.75/2018-19; dt 18.08.2018.
Sd/-
Engineer-in-Chief(P.H)
//ATTESTED//
Executive Engineer(P.H)
BT road 9
1 GSB 10106.8 Cum GSB/WMM 21678.8 14453
2 WMM 11572 Cum
3 DMB 3446 Cum DMB/BC 5275 3517
4 BC 1829 Cum
Central Divider
M20 4408 Cum PCC M15 grade and above 4408 2939
Lighting
No of poles 398 Nos No of poles 398 265
LED/ 398 Nos Lights 398 265
166216311.53 55405437
0 0
1.BT roads
KODADA MUNICIPALITY
1) NAME OF WORK : DEVELOPMENT OF BT ROADS UNDER TUFIDC ASSISTANCE IN KODADA MUNICIPALITY
BILL OF QUANTITIES
ESTIMATE AMOUNT Rs.
Sl
Description of item Quantity Rate Per
No
1 2 3 4 5
1 Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket
capacity including cutting and loading in tippers, trimming bottom and side
slopes, in accordance with requirements of lines, grades and cross-sections,
and transporting to the embankment location with all lifts and lead upto 1000
m as per Technical Specification Clause 302.3 MORD / 301 MORTH
Sl
Description of item Quantity Rate Per
No
1 2 3 4 5
5 Providing, laying, spreading and compacting graded stone aggregate to wet
mix macadam specification including premixing the material with water at
OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to
site, laying in uniform layers in sub-base/base course on a well prepared
sub-base and compacting with smooth wheel roller of 80 to 100kN /
Vibratory Roller 80-100 kN weight to achieve the desired density including
lighting, barricading and maintenance of diversion, etc as per Tables 400.11
& 400.12 and Technical Specification Clause 406 MORD / MORTH.
Sl
Description of item Quantity Rate Per
No
1 2 3 4 5
8 Providing and laying bituminous macadam with 100-120 TPH / 40-60 TPH
hot mix plant producing an average output of 75 tonnes/ 37.50 t per hour
using crushed aggregates of specified grading premixed with bituminous
binder 3.3% , transported to site, laid over a previously prepared surface
with paver finisher to the required grade, level and alignment and rolled as
per clauses 501.6 and 501.7 to achieve the desired compaction as per Tech.
specification No. 504 MORTH.
Sl
Description of item Quantity Rate Per
No
1 2 3 4 5
9 Providing and laying bituminous concrete with 100-120 TPH batch type hot
mix plant producing an average output of 75 tonnes per hour using crushed
aggregates of specified grading, premixed with bituminous binder @ 5.4 to
5.6 per cent of mix and filler, transporting the hot mix to work site, laying
with a hydrostatic paver finisher with sensor control to the required grade,
level and alignment, rolling with smooth wheeled, vibratory and tandem
rollers to achieve the desired compaction as per MORTH specification
clause No. 509 complete
10 Providing and filling with gravel brought from out side and labouur charges
for filling and spreading in layers of not more than 150mm thick each or as
directed by engineer-in-charge during execution, watering, compacting each
layer, labour charges for all operations, all water leads etc complete.
Sl
Description of item Quantity Rate Per
No
1 2 3 4 5
Name of Work: Construction of Box Culverts at Various places in
Kodad Municipality
11 RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by
Manual means: Earthwork excavation in all kinds of soil for Pipe line
trenches as per drawings and technical specifications including setting out,
construction of shoring and bracing, removal of stumps and other
deleterious material , dressing of sides and bottom as per Technical
Specification 305 MoRD / 304 MoRTH and as directed by the departmental
officer including protecting the existing utility services wherever it is possible
during the execution and taking all precautionary measures in the restricted
areas for laying sewer/water pipe lines including divertion of traffic and
backfilling in trenches with excavated suitable material and disposal of
remaining earth upto a lead of 50 m, including all incidental and operational
charges etc., complete by manual means.
Sl
Description of item Quantity Rate Per
No
1 2 3 4 5
27.90 cum 910.40 1 cum
14 BLD-CSTN-3-5 (22) : Plain Cement concrete nominal mix (1:4:8) prop
(Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite
Machine Crushed Metal including cost and conveyance of all materials like
cement, sand, coarse aggregate water etc., to site, labour charges , for
mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to
the required level curing etc., complete for finished item of work.for
foundation and under flooring bed.
Sl
Description of item Quantity Rate Per
No
1 2 3 4 5
16 BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix
Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size
graded machine crushed hard granite metal (coarse aggregate) from
approved quarry including cost and conveyance of all materials like cement,
fine aggregate (sand) coarse aggregate, water etc., to site including all
operational, incidental and labour charges such as weigh batching, machine
mixing, laying concrete, vibrating, curing, centering and suttering charges
etc.,complete but excluding seignorage charges, cost of steel and its
fabrication charges for finished item of work (APSS No. 402) with minimum
cement content as per IS code.
Sl
Description of item Quantity Rate Per
No
1 2 3 4 5
a Side wall 90.72 cum 11482.84 1 cum
b Top slab 400mm thick 36.00 cum 7481.97 1 cum
17 BLD-CSTN-4-1-(34) : Providing High Yield Strength Deformed (HYSD)/
Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 500
grade as per IS 1786-1979) of different diameters for RCC works , including
labour charges for straightening, cutting, bending to required sizes and
shapes, placing in position with cover blocks of approved materials and size
and tying and lap-splicing with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and drawings, including cost
and conveyance of steel bars, including all wastages such as overlaps,
couplings, chairs, spacer bars including cost and conveyance of binding
wire, cover blocks and all incidental, operational, labour charges such as
cutting, bending, placing in position, tying complete for finished item of work
in all floors.( APSS No.126
18712.00 kg 68.71 1 kg
18 Supplying and fixing of 110mm dia PVC pipes for weep holes including
material, labour charges like cutting size, fixing in side wall etc as directed
by Engineer- in- charge
48.00 mts 265.86 1 mt
19 Carting of surplus excavated rock/Soil within a lead of 5Km from the site to a
distance suitable including loading charges, cost & conveyance, dumping,
labour charges and other incidental and operational charges etc., complete.
Sl
Description of item Quantity Rate Per
No
1 2 3 4 5
20 BLD-CSTN-2-8 (16) : Filling with gravel with initial lead in layers not
exceeding 15 cm thick, consolidating each deposited layer by watering and
ramming including cost and conveyance of water to work site and all
operational, incidental, labour charges, hire charges of T & P etc., complete
for finished item of work. (APSS NO. 309 & 310)
Sl
Description of item Quantity Rate Per
No
1 2 3 4 5
Name of Work : Providing Traffic sign, Marking & Other Appurenances for
B.T Roads at Various locations in Kodada Municipality
21 Pavement markings with hot applied thermoplastic material complete as per
drawing and Technical Specifications clause 803.
a) Lane / Centre line / Edge marking / and Pedestrian passage / Arrows all
819.36 Sqm 667.91 1 Sqm
other road marking etc.
22
Supplying and fixing sign boards complete as per Technical Specifications
clause 801 and as directed by engineer, including the cost of posts, fixtures,
foundation, fitting & fixing. Sheeting will be retro-reflective tyupe of high
intensity grade and messages/borders will be screen printed.
Sl
Description of item Quantity Rate Per
No
1 2 3 4 5
Sl
Description of item Quantity Rate Per
No
1 2 3 4 5
b) Cautionary signs
Sl
Description of item Quantity Rate Per
No
1 2 3 4 5
Providing and fixing Cautionary / Warning sign boards size 900 mm
equilateral triangle made out of Type – XI of ASTMD 4956-09 wide angle
cube cornered micro Prismatic Retro reflective sheeting and confirming to
IRC 67:2012 for full background of White colour and letters/logos
done by screen printing in Black colour, boarders by screen printing in Red
colour and fixed over 4MM Aluminium Composite Material sheet having
minimum 0.5 mm thick Aluminium skin on both sides with back side painted
grey colour and fixed over back support frame of M.S angle 25x25x3mm all
round and fixing with 35x35x4mm and mounted on a MS angle post of size
75x75x6mm with clear height of not less than 2.1 m from the ground level 10.00 each 6,226.00 1 each
to the bottom of the board. The signpost should be painted with one coat of
red oxide paint and 2 coats of synthetic enamel paint Black and White colour
with bands of 30cm of height. The signpost shall be firmly fixed with MS
base angle 35x35x4 mm in to the ground by M-15 Concrete foundation of
size 450x450x600mm including cost and conveyance of all materials
,equipment, machinery and labour with all leads and lift, loading chages
necessary for satisfactory completion of the work as directed by Engineer
-in-Charge.
Sl
Description of item Quantity Rate Per
No
1 2 3 4 5
Supplying and installation of Hazard Marker using M.S. angle of size
55x55x6mm and 120cm high above ground level painted with two coats of
black & white stripes of 15cm wide with firstquality synthetic enamel paint
over one coat of appropriate primer of approvedbrand,colour, with 30cm x
90cm Type – XI of ASTMD 4956-09 wide angle cube cornered micro
Prismatic Retro reflective sheeting of Yellow colour and confirming to IRC
67:2012 fixed over 3MM Alluminium Composite Material having minimum
0.30 mm thick Aluminium skin on both sides with standard supports
consisting of alternately black and Yellow with black stripes in screen
printing sloping downward at an angle of 45 degrees towards the side of the 6.00 each 4,003.00 1 each
obstruction onwhich the traffic is to pass and buried into the ground in a
trench of size 30cm x 30cm and 50cm depth filled with CC M-20 including
cost and conveyance of all materials, equipment, machinery and labour with
all leads and lifts, loading and un-loading charges necessary for successfull
completion of the work on any road in division as directed by Engineer-in-
Charge andconforming to IRC 67-2012 &MORT&H specification No.805 and
approved drawings etc., complete for finished item of work.
Sl
Description of item Quantity Rate Per
No
1 2 3 4 5
Supply and Application of Alluminium Backed flexible prismatic sheeting
(AFP) which shall be of 1ft width Sq ft) and laminated at the back with a 50
micron thick Aluminum (Al) foil with pressure sensitive adhesive and liner.
Further, this flexible prismatic sheeting shall have screen printed arrow/slant
line pattern in black color on top in a continuous roll format. Neither AFP
sheeting nor the flexible prismatic sheeting used in it shall crack when slowly
bent in 1 second time around a 1/8th inch mandrel after being conditioned
for 24hrs at 0°C and tested as per section S2.2.2. of ASTM D 4956-09. The
AFP sheeting, with the liner removed, shall be applied with aneoprene 100.00 Sft 452.00 1 Sft
contact adhesive with Polychloroprene as base, viscosity of 200-450 cps and
solid content of 20-30%. Once applied, the edges of the product shall be
sealed all around with a two-part epoxy based structural adhesive and shall
be extremely resistant to peel-off. A test report from institutes like
ARAI/CRRI confirming to above
mentioned flexibility and ASTM-D4956-09 Type-VI retro reflectivity
performance of the flexible prismatic sheeting used in AFP shall be
submitted by the tenderer during prequalification and supply of material.
c) Mandatory signs, size
Sl
Description of item Quantity Rate Per
No
1 2 3 4 5
Providing and fixing Mandatory / Regulatory sign boards size 600 mm
circle made out of Type – XI of ASTMD 4956-09 wide angle cube cornered
micro Prismatic Retro reflective sheeting and confirming to IRC 67:2012 for
full background of White colour and letters/logos done by screen printing in
Black colour, boarders by screen printing in Red colour and fixed over 3MM
Alluminium Composite Material sheet having minimum 0.30mm thick
Aluminium skin on both sides with back side painted grey colour and fixed
over back support frame of M.S angle
25x25x3mm all round and fixing with 35x35x4mm and mounted on a MS
angle post of size 75x75x6mm with clear height of not less than 2.1 m from 4.00 each 5,169.00 1 each
the ground level to the bottom of the board. The signpost should be painted
with one coat of red oxide paint and 2 coats of synthetic enamel paint Black
and White colour with bands of 30cm of height. The signpost shall be firmly
fixed with MS base angle 35x35x4 mm in to the ground by M-15 Concrete
foundation of size450x450x600mm including cost and conveyance of all
materials ,equipment, machinery and labour with all leads and lift, loading
charges necessary for satisfactory completion of the work as directed by
Engineer -in-Charge.
Sl
Description of item Quantity Rate Per
No
1 2 3 4 5
23 Supplying and installation of delineators (Roadway indicators) not less
than 800mm high above ground level. The delineator shall have a core
and shell construction which shall be made of tough, high impact resistant,
injection-molded, thermoplastic outer body. The inner core shall consist of
powder coated or painted Mild steel of minimum thickness 1.0mm. The
delineator should have top retro-reflective unit consisting of white color
micro prismatic non metallic retro-reflective sheeting of minimum exposed
area of 125 cm2 and bottom retroreflective unit consisting of red color micro 120.00 each 1,541.00 1 each
prismatic non metallic retro-reflective sheeting of minimum exposed area of
35 cm2 confirming to ASTM D4956 type XI standards. The delineators shall
be fixed to the ground by inserting the root of the delineator up to the
marked portion and by firm concrete filling as per the instructions by
engineer in-charge.
Sl
Description of item Quantity Rate Per
No
1 2 3 4 5
24 Supplying & Fixing of Moulded Shanks Raised Pavement Markers made
of plastic body moulded from HIPS(HIImpact Polysterene) or ABS or ASA
( Acrylic Strene Acrylonitrite and reflective panels with micro prismatic lens
capable of providing total internal reflection of the light entering the lens
face and shall support a load of 13635 kg tested in accordance to ASTM D
4280 Type H and complying to Specifications of Category A ofMORTH
Circular No RW/NH/33023/10-97 – DO III Dt 11.06. 1997. The height and
width shall not exceed 20 mm and 130 mm with minimum reflective area of
13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. 5,700.00 each 316.00 1 each
The strength of detachment of the integrated cylindrical shanks, (of
diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm)
from the body is to be a minimum value of 700 Kgs. Fixing will be by drilling
holes on the road for the twin shanks to go inside, without nails and using
epoxy resin based adhesive as per manufacturer’s recommendation and
complete as directed by the engineer.
KODADA MUNICIPALITY
F BT ROADS UNDER TUFIDC ASSISTANCE IN KODADA MUNICIPALITY
BILL OF QUANTITIES
1033.98 Lakhs
Amount
2206667.05
1459435.50
939306.15
13106131.27
Page 175 of 2191
1.BT roads
Amount
22109635.15
1171278.95
439112.95
Amount
22437682.26
Amount
15202737.61
283683.40
79355670.29
Amount
122581.43
10544.00
Amount
6
25400.16
88996.03
459323.28
Amount
Amount
6
1041723.24
269350.92
1285701.52
12761.28
62801.77
Amount
13835.22
3393018.85
Amount
547,258.74
Amount
161,988.00
Amount
22,296.00
Amount
62,260.00
Amount
24,018.00
Amount
45,200.00
Amount
20,676.00
Amount
184,920.00
Amount
1,801,200.00
2869816.74
85618505.88
Kodada Municipality
Constructing Divider in Various Roads in Kodada Municipality
DETAILED AND ABSTRACT ESTIMATE
S.no Description of Item Nos L B D Qty Rate Per
1 Suryapet bypass road (KLR avenue) to Vijyawada 5700.00 mts
bypass road
2 Khammam road in kodad town.From khammam 1000.00 mts
cross road to RTA office.
3 Mellacheruvu road kodad town.From khammam 1500.00 mts
cross road to vijyawada bypass.
above G.L 300mm thick to 230mm thick 1 x 2 9450.00 0.27 0.450 2253.8
1x 1 9450.00 9450.0
9450.0 Rmt 124.94 1 Rmt
TOTAL Rs:
Page 199 of 2191 2.Dividers
Kodada Municipality
vider in Various Roads in Kodada Municipality
AILED AND ABSTRACT ESTIMATE
Amount
3580022.88
Page 200 of 2191 2.Dividers
Amount
119591.64
0.00
4463632.52
Page 201 of 2191 2.Dividers
Amount
19750143.23
4200547.68
Page 202 of 2191 2.Dividers
Amount
355320.00
1180683.00
33649940.95
336.50 Lakhs
Page 203 of 2191 3.central lighting
KODAD MUNICIPALITY
Name of the Work::Providing Double Arm Central Lighting at various places in Kodad Municipality
1 ELEC-7.2.1 (b) Fabrication, Transportation and supply of hot-dip galvanized Octogonal Pole with
BSEN - 10025 grade S 355 JO steel plate for shaft, IS 2062 for base plate with door
opening arrangement, including the supply of suitable boards with bakelite sheet and
MCB's as per IS specification suitable to withstand the wind speed of 180 KMPH for 9
Mtrs height Pole having dimensions Bottom 155mm, Top 70mm with 3mm thick, base
plate 260 x 260 x 16mm and 4 Nos of M24 x 750mm long 'J' bolts along with
template. Makes: BAJAJ / VALMONT / TRANSRAIL / SKIPPER / UTKARSH /
LAASMA
5 ELEC-7.5.2 b Supply and fixing of suitable out door feeder piller box of size made with 14 SWG CRCA sheet
with double door arrangement, making powder coating after processing of 7 Tank process, lock
and key,hinges, rubber gasket, danger board,suitable angle iron stand for mounting the feeder
pillar with cement concrete, including Supply and fixing of Legrand / Schnieder make as out
goings, indication lamps, din channel, 6 Sqmm 3 core copper cable for invidual light control,
connectors, gland plates and provision for 3 phase energy meter etc., complete for finished item
of work and suitable wiring provision for connecting the nature switch with following.(63A, 4 Pole
isolator as incomer, 6 Nos 6-32A SP MCBs)
6 Std DATA 5.1.1 Providing independent earthling by excavating a trench to a depth of 2.1 M in all soils,
as per size specified in the Data, using 40mm dia 'B' class GI pipe of 2.5 Mtrs length
with necessary accessories with hume pipe ring duly providing staggered holes
including filling with equal proportion of Salt and Charcoal in layers and all labour
charges etc., complete for small quarters. for each piller
box
40.00 3730.97 No.s 149238.80
7 ELEC-4.8.1 (b) Supply and Transportation incluiding Earth work excavation and laying charges of
Outer dia 63mm and Inner dia 51mm double walled corrugated HDPE duct made as
per specification BSEN - 500 86/IS 14930 Part-II. Makes:DURA LINE (Dura Guard) or
its equivalent make.51mm dia DWC pipe
9 ELEC- 3.5.2(d) Supply and fixing of Automatic Street Light Control System with Optical Sensor, Low
volatage / High voltage trip and reset, operating voltage 380 - 450 V AC, 50 HZ with
suitable SMC enclousure of IP 54 protection, MCBs of Legrand / Schneider / L&T /
Siemens of 10KA C/D curve and Contactor suitable to control the load of 12KW three
phase load with necessary clamping arrangements. Makes : Swadeep Nature Switch /
Light Mate / L&T / Siemens / Bajaj.
10 15.6.1 Supplying and erecting of 50Sq.mm 3 ½ core PVC armoured U.G cable 1100V grade with ISI
mark following strand/solid aluminium conductor by making trench in soil up to 0.9m deep
embedding the cable complete with sand bed of 20cm, thick layers and bricks placed on top of
the cable width wise all over the run and backfilling the excavated earth without stones and hard
materials and making the surface proper, 8 SWG GI wire including glands, lugs, including
crimping job, to be laid partly in trench, partly in ground with cable indicators at 8 Meter interval
etc, complete as directed by site In-Charge for service connections etc., complete. (Asian /
Universal / Paragon/ Finolex / Polycab / Powerflex) from feeder pillars to Meter box.and as per
the directions of the Engineer.
11 ELEC-4.1.1 (F) Supply and laying of 16 Sqmm 4 Core XLPE insulated, 1100V grade armoured
alluminium cable as per specification confirming to IS:7098 (Part - I). Makes : Torrent /
Universal / Unicab / Polycab / Havells / Gloster / KEI or equivalent
12 ELEC-1.5.6(b) Supply and laying of 4.0 Sqmm (56/0.3) 2 Core PVC Insulated, Flexible Armouring
Flexible Copper cable as per IS 7098 / Part-I / 1988 including all transportation
charges etc complete. Makes : Finolex / RR kabel / avells / Polycab / RPG / KEI /
Nakoda / Gemni / HPL / Gloster
Page 206 of 2191 3.central lighting
13 ELEC-2.13.1 Supply and fixing of 6-32A 10KA SP MCB, C/D Curve ISI Mark. Makes : Legrand-DX3 /
(458(a)) Schneider-Acti9 / Siemens / L&T,Exora.
15 ELEC- 4.4.1 Supply and fixing of heavy duty long barrel copper lugs confirming to I.S
specifications suitable for 16 sqmm cable etc complete with nuts, bolts and washers.
Makes: DMI / Jainson / Dowels
17 ELEC- 4.4.1 Supply of heavy duty long barrel copper lugs confirming to I.S specifications
suitable for 16 sqmm cable etc complete with nuts, bolts and washers. Makes:
DMI / Jainson / Dowels
Widening of Existing CC Road with CC Road on Both Sides in Kattakommu Gudem Road under TUFIDC Assistance in Kod
Kodada Municipality
Junction improvement at Khammam cross roads and Rajiv chowk in Kodada Municipality
DETAILED AND ABSTRACT ESTIMATE
S.no Description of Item Nos L B D Qty Rate Per
1 khammam cross road in kodad town. 6.00 dia
2 Rajiv chowk in kodad town 6.00 dia
Earth work 1 x 1 16.96 0.60 0.550
PCC (1:4:8)prop 1 x 1 16.96 0.60 0.100
2x 1 16.96 33.9
33.9 Rmt 124.94 1 Rmt
TOTAL Rs:
217 of 2191 5.jun imp
Kodada Municipality
m cross roads and Rajiv chowk in Kodada Municipality
D AND ABSTRACT ESTIMATE
Amount
4013.32
2360.19
218 of 2191 5.jun imp
8631.72
35767.91
63256.88
219 of 2191 5.jun imp
4450.51
3239.55
220 of 2191 5.jun imp
13348.15
3251.65
4236.97
142556.85
Page 221 of 2191 6.pathway
Kodad Municipality
odad Municipality
1 Cum 261540.80
1 Cum 2588836.39
Page 226 of 2191 6.pathway
Per Amount
1 Sqm 3205028.37
Page 227 of 2191 6.pathway
Per Amount
1 rmt 1774688.00
1 Sqm 420592.50
1 Sqm 313456.50
1 Each 480748.00
Page 228 of 2191 6.pathway
Per Amount
1 No.s 631522.70
9676413.26
Total 9676413.26
e estimation Rs. Say 96.76 Lakhs
229 of 2191 BT Rd - Det
1 2 3
1 Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket
capacity including cutting and loading in tippers, trimming bottom and side
slopes, in accordance with requirements of lines, grades and cross-sections,
and transporting to the embankment location with all lifts and lead upto 1000
m as per Technical Specification Clause 302.3 MORD / 301 MORTH
Sl
No Description of item Quantity
1 2 3
20%
i) Road No.1(A): Widening of BT Road from Red Chillies Restaurant to HP Petrol 4650.00
Bunk in Suryapet Road in Kodada Municipality
ii) Road No.2: Widening of BT Road from Khammam Cross Roads to NH-65 in 2392.50
Gudibanda Road in Kodada Municipality
iii) Road No.3: Widening of BT Road from Khammam Cross Roads to Pichaiah 1650.00
Bricks factory at RTA Office Road in Kodada Municipality
Road No.4: Widening of BT Road from Rajiv Chowk to NH-65 at Huzurnagar 2033.75
Road in Kodada Municipality
Road No.5: Laying of BT Road from Ananthagiri Road to Lakshmipuram 845.84
Village in Kodada Municipality
11572.09 Cum
231 of 2191 BT Rd - Det
Sl
No Description of item Quantity
1 2 3
6 Providing and applying with prime coat with Bitumen Emulsion (RS-I)@ 0.60
kg / sqm on prepares surface of granular surface including cost and
conveyance of all materials to work site and laid on prepared surface and
including clearing the road surface and spraying primer etc., complete for
finished item of work as per MoRT&H Specification 502 (5th Revision) and as
directed by the Engineer-in-charge.
i) Road No.1(A): Widening of BT Road from Red Chillies Restaurant to HP Petrol 18600.00
Bunk in Suryapet Road in Kodada Municipality
ii) Road No.2: Widening of BT Road from Khammam Cross Roads to NH-65 in 9570.00
Gudibanda Road in Kodada Municipality
iii) Road No.3: Widening of BT Road from Khammam Cross Roads to Pichaiah 6600.00
Bricks factory at RTA Office Road in Kodada Municipality
Road No.4: Widening of BT Road from Rajiv Chowk to NH-65 at Huzurnagar 8135.00
Road in Kodada Municipality
Road No.5: Laying of BT Road from Ananthagiri Road to Lakshmipuram 3759.50
Village in Kodada Municipality
46664.50 Sqm
7 Providing and applying tack coat with bitumen emulsion RS-1 using Bitumen
pressure distributor at the rate of 0.20 Kgs per sqm on the prepared
bituminous/granular surface cleaned with mechanical broom for finished item
of work as per MoRT&H Specification 503 (5th revision) and as directed by
the Engineer-in-Charge.
ii) Road No.2: Widening of BT Road from Khammam Cross Roads to NH-65 in 9570.00
Gudibanda Road in Kodada Municipality
iii) Road No.3: Widening of BT Road from Khammam Cross Roads to Pichaiah 6600.00
Bricks factory at RTA Office Road in Kodada Municipality
Road No.4: Widening of BT Road from Rajiv Chowk to NH-65 at Huzurnagar 8135.00
Road in Kodada Municipality
Sl
No Description of item Quantity
1 2 3
8 Providing and laying of 50 mm thick Dense Graded Bituminous Macadam
(DBM) grading - II with with 40-60 TPH hot mix plant producing an output of
37.50 t per hour using BT 60/70 grade @ 4.50% crushed aggregates of
specified grading premixed with bituminous binder, transported to site, laid
over a previously prepared surface with paver finisher to the required grade,
level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the
desired compaction as per Tech. specification No. 504 MORTH for finished
item of work as directed by the Engineer-in-Charge including hire and
operational charges all T&P and all other contingent charges necessary
including cost of (excluding seigniorage) charges of all materials etc.,
complete (Excluding VAT Charges)
i) Road No.1(A): Widening of BT Road from Red Chillies Restaurant to HP Petrol 1488.00
Bunk in Suryapet Road in Kodada Municipality
ii) Road No.2: Widening of BT Road from Khammam Cross Roads to NH-65 in 478.50
Gudibanda Road in Kodada Municipality
iii) Road No.3: Widening of BT Road from Khammam Cross Roads to Pichaiah 330.00
Bricks factory at RTA Office Road in Kodada Municipality
Road No.4: Widening of BT Road from Rajiv Chowk to NH-65 at Huzurnagar 650.80
Road in Kodada Municipality
Road No.5: Laying of BT Road from Ananthagiri Road to Lakshmipuram 188.08
Village in Kodada Municipality
Quantity as per separate sheet 3135.38
Add Camber correction 10% 313.54
3448.92 Cum
i) Road No.1(A): Widening of BT Road from Red Chillies Restaurant to HP Petrol 744.00
Bunk in Suryapet Road in Kodada Municipality
ii) Road No.2: Widening of BT Road from Khammam Cross Roads to NH-65 in 382.80
Gudibanda Road in Kodada Municipality
iii) Road No.3: Widening of BT Road from Khammam Cross Roads to Pichaiah 264.00
Bricks factory at RTA Office Road in Kodada Municipality
Road No.4: Widening of BT Road from Rajiv Chowk to NH-65 at Huzurnagar 325.40
Road in Kodada Municipality
Road No.5: Laying of BT Road from Ananthagiri Road to Lakshmipuram 112.89
Village in Kodada Municipality
233 of 2191 BT Rd - Det
Sl
No Description of item Quantity
1 2 3
1829.09 Cum
10 Providing and filling with gravel brought from out side and labouur charges
for filling and spreading in layers of not more than 150mm thick each or as
directed by engineer-in-charge during execution, watering, compacting each
layer, labour charges for all operations, all water leads etc complete.
i) Road No.1(A): Widening of BT Road from Red Chillies Restaurant to HP Petrol 700.00
Bunk in Suryapet Road in Kodada Municipality
ii) Road No.2: Widening of BT Road from Khammam Cross Roads to NH-65 in 290.00
Gudibanda Road in Kodada Municipality
iii) Road No.3: Widening of BT Road from Khammam Cross Roads to Pichaiah 200.00
Bricks factory at RTA Office Road in Kodada Municipality
Road No.4: Widening of BT Road from Rajiv Chowk to NH-65 at Huzurnagar 240.00
Road in Kodada Municipality
1430.00 Cum
234 of 2191 Rd-1
Road No.1(A): Widening of BT Road from Red Chillies Restaurant to HP Petrol Bunk in Suryapet Road in Kodada
Earth work excavation for widening portion Loosening GSB WMM DBM
Exist RD Prop RD of Soil (cum) (cum) (cum)
Width (m) Avg Width (m) Prime &
Length
CH Sum of Tack Coat
(m) Avg. Width Depth Qty (Sqm)
(m) (cum) 300 THK
23.00' 44.60' Lef Right Lef Right (m) 0.200 0.250 0.080
CUM
1(A): Widening of BT Road from Red Chillies Restaurant to HP Petrol Bunk in Suryapet Road
50 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
100 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
150 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
200 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
250 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
300 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
350 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
400 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
450 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
500 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
550 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
600 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
650 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
700 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
750 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
800 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
850 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
234 - of - 2191
235 of 2191 Rd-1
Earth work excavation for widening portion Loosening GSB WMM DBM
Exist RD Prop RD of Soil (cum) (cum) (cum)
Width (m) Avg Width (m) Prime &
Length
CH Sum of Tack Coat
(m) Avg. Width Depth Qty (Sqm)
(m) (cum) 300 THK
23.00' 44.60' Lef Right Lef Right (m) 0.200 0.250 0.080
CUM
900 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
950 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
1000 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
1050 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
1100 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
1150 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
1200 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
1250 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
1300 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
1350 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
1400 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
1450 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
1500 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
1550 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
1600 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
1650 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
1700 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
1750 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
1800 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
1850 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
235 - of - 2191
236 of 2191 Rd-1
Earth work excavation for widening portion Loosening GSB WMM DBM
Exist RD Prop RD of Soil (cum) (cum) (cum)
Width (m) Avg Width (m) Prime &
Length
CH Sum of Tack Coat
(m) Avg. Width Depth Qty (Sqm)
(m) (cum) 300 THK
23.00' 44.60' Lef Right Lef Right (m) 0.200 0.250 0.080
CUM
1900 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
1950 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
2000 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40
236 - of - 2191
237 of 2191 Rd-1
Earth work excavation for widening portion Loosening GSB WMM DBM
Exist RD Prop RD of Soil (cum) (cum) (cum)
Width (m) Avg Width (m) Prime &
Length
CH Sum of Tack Coat
(m) Avg. Width Depth Qty (Sqm)
(m) (cum) 300 THK
23.00' 44.60' Lef Right Lef Right (m) 0.200 0.250 0.080
CUM
1 (B): Widening of BT Road from Khammam cross road to NH-65 in Sri rangapuram road.
50 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40
100 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40
150 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40
200 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40
250 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40
300 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40
350 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40
400 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40
450 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40
500 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40
550 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40
600 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40
650 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40
700 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40
750 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40
800 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40
850 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40
900 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40
237 - of - 2191
238 of 2191 Rd-1
Earth work excavation for widening portion Loosening GSB WMM DBM
Exist RD Prop RD of Soil (cum) (cum) (cum)
Width (m) Avg Width (m) Prime &
Length
CH Sum of Tack Coat
(m) Avg. Width Depth Qty (Sqm)
(m) (cum) 300 THK
23.00' 44.60' Lef Right Lef Right (m) 0.200 0.250 0.080
CUM
950 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40
1000 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40
1050 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40
1100 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40
1150 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40
1200 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40
1250 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40
1300 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40
1350 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40
1400 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40
1450 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40
1500 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40
238 - of - 2191
239 of 2191 Rd-1
0.50 0.50
239 - of - 2191
240 of 2191 Rd-1
240 - of - 2191
241 of 2191 Rd-1
528.00 400.00
241 - of - 2191
242 of 2191 Rd-1
0.50 0.50
242 - of - 2191
243 of 2191 Rd-1
216.00 300.00
744.00 700.00
243 - of - 2191
244 of 2191 Rd-2
Road No.2: Widening of BT Road from Khammam Cross Roads to NH-65 in Gudibanda Road in Kodada Mun
Earth work excavation for widening portion Loosening GSB WMM DBM
Exist RD Prop RD of Soil (cum) (cum) Prime & (cum)
Length Width (m) Avg Width (m)
CH Sum of Tack Coat
(m)
Avg. Width Depth Qty (Sqm)
(m) (cum)
Lef Right Lef Right (m) 300 THK 0.200 0.250 0.050
50 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50
100 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50
150 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50
200 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50
250 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50
300 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50
350 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50
400 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50
450 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50
500 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50
550 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50
600 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50
650 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50
700 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50
750 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50
800 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50
850 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50
900 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50
245 of 2191 Rd-2
Earth work excavation for widening portion Loosening GSB WMM DBM
Exist RD Prop RD of Soil (cum) (cum) Prime & (cum)
Length Width (m) Avg Width (m)
CH Sum of Tack Coat
(m)
Avg. Width Depth Qty (Sqm)
(m) (cum)
Lef Right Lef Right (m) 300 THK 0.200 0.250 0.050
950 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50
1000 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50
1050 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50
1100 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50
1150 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50
1200 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50
1250 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50
1300 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50
1350 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50
1400 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50
1450 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50
0.50 0.50
382.80 290.00
248 of 2191 Rd-3
Road No.3: Widening of BT Road from Khammam Cross Roads to Pichaiah Bricks factory at RTA Office Road in K
50 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50
100 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50
150 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50
200 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50
250 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50
300 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50
350 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50
400 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50
450 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50
500 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50
550 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50
600 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50
650 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50
700 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50
750 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50
800 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50
850 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50
900 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50
950 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50
249 of 2191 Rd-3
1000 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50
0.50 0.50
Gravel filling
BC Qty
(cum) (cum)
Width (m) Avg Width (m) Sum of
Avg. Width
0.040 Lef Right Lef Right (m) 0.200
264.00 200.00
252 of 2191 Rd-4
Road No.4: Widening of BT Road from Rajiv Chowk to NH-65 at Huzurnagar Road in Kodada Munici
50 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60
100 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60
150 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60
200 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60
250 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60
300 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60
350 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60
400 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60
450 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60
500 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60
550 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60
600 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60
650 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60
700 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60
750 6.70 13.60 50.00 3.45 3.45 3.45 3.45 4.00 0.570 114.00 60.00 40.00 50.00 200.00 16.00
800 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60
850 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60
900 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60
950 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60
253 of 2191 Rd-4
1000 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60
1050 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60
1100 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60
1150 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60
1200 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60
1250 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60
1300 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60
1350 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60
1400 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60
1450 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60
1500 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60
1550 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60
0.50 0.50
Gravel filling
BC Qty
(cum) (cum)
Width (m) Avg Width (m) Sum of
Avg. Width
0.040 Lef Right Lef Right (m) 0.200
325.40 240.00
256 of 2191 Rd-5
Road No.5: Laying of BT Road from Ananthagiri Road to Lakshmipuram Village in Kodada Municipality
50 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48
100 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48
150 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48
200 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48
250 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48
300 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48
350 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48
400 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48
450 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48
500 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48
550 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48
600 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48
650 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48
700 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48
750 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48
800 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48
850 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48
900 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48
950 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48
257 of 2191 Rd-5
1000 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48
1030 0.00 3.65 30.00 1.83 1.83 1.83 1.83 3.65 0.455 49.82 32.85 16.43 24.64 109.50 5.48 3.29
0.38 0.38
Gravel filling
Qty
(cum)
Width (m) Avg Width (m) Sum of
Avg. Width
Lef Right Lef Right (m) 0.000
0.00
260 of 2191 Culvert
187.12 100.00
Size
Depth Quantity
3.15 581.18
581.18 Cum
200.00 Hphr
0.400 50.40
10.00
60.40 Cum
266 of 2191 Culvert
2.400 86.40
1.200 4.32 Cum
90.72 Cum
2.000 36.00
36.00 Cum
48.00
48.00 mts
348.71 Cum
267 of 2191 Culvert
69.74
69.74 cum
Page 268 of 2191 Lead
KODADA MUNICIPALITY
DATA BASED ON - 2018 - 2019 SSR
Sep-18
Statement showing the cost of Materials for the year 2018-19
1 Fine aggregate Sand for filling 36.c 1 Cum 570.00 570.00 68 Km 832.80
2 Fine aggregate sand for Concrete & Filtering items 36.b 1 Cum 570.00 570.00 68 Km 832.80
3 Fine aggregate sand for Mortar, Plastering & Sand blasting 36.a 1 Cum 760.00 760.00 68 Km 832.80
4 Crushed stone sand / Rock sand 4.75mm to 2.36 mm 94 1 Cum 550.00 550.00 10 Km 125.60
5 Gravel including stacking 34 1 Cum 98.00 98.00 5 Km 57.10
6 Quarry rubbish 35 1 Cum 77.00 77.00 5 Km 57.10
7 Earth Cost or compensation 102 20 1 Cum 65.00 65.00 5 Km 57.10
8 Red earth Cost 102 20 1 Cum 98.00 98.00 5 Km 57.10
B STONE FOR MASONRY WORK 0.00
8 Un Coursed rubble stone 79 14 1 Cum 340.00 340.00 10 Km 126.80
9 Randam Rubble stone 22.g 32 1 Cum 239.00 239.00 10 Km 126.80
10 Coursed rubble stone 23.a 12 1 Cum 249.00 249.00 10 Km 126.80
11 Rough stone 20 x 20 x 75 cm -33 Nos - 25/- 825.00 825.00 10 Km 126.80
12 Bond stones ( 600 x 200 x 200 mm ) - Rs.29/- - 41 Nos 1189.00 1189.00 10 Km 126.80
13 Coursed rubble stone 30 x 30 x 45 cm (Rs-20/each) -24 Nos/m 3 13 12 1 Cum 480.00 67.00 480.00 10 Km 126.80
14 Coursed rubble stone 30 x 30 x 60 cm (Rs-28/each)-18 Nos/m 3 14 12 1 Cum 504.00 67.00 504.00 10 Km 126.80
15 Through stones 20 x 20 x 30 to 45 cm long (Rs-23/each )-55 Nos/m 3 75 14 1 Cum 1265.00 67.00 1265.00 10 Km 126.80
16 Through stones 25 x 25 x 45 to 60 cm long (Rs-39/each)-26 Nos/m 3 76 14 1 Cum 1014.00 67.00 1014.00 10 Km 126.80
17 Through stones 30 x 30 x 65 to 75 cm long (Rs-59/each)-14 Nos/m 3 76 22 1 Cum 826.00 67.00 826.00 10 Km 126.80
18 Crushed stone sand / Rock sand 4.75mm to 2.36 mm 94 33 1 Cum 550.00 67.00 550.00 10 Km 126.80
19 Coarse aggregate 10-4.75 mm 7 17 1 Cum 760.00 67.00 190.00 -9.90 1007.10 10 Km 126.80
Page 269 of 2191 Lead
20 Coarse aggregate 20-10 mm 8 17 1 Cum 990.00 67.00 247.50 -9.90 1294.60 10 Km 126.80
21 Coarse aggregate 40-20 mm 9 17 1 Cum 890.00 67.00 222.50 -9.90 1169.60 10 Km 126.80
22 Coarse aggregate 80-40 mm 10 17 1 Cum 510.00 67.00 127.50 -9.90 694.60 10 Km 126.80
23 Jeddy Stone 450 mm to 600 mm thick 1 Cum 179.00 67.00 44.75 -9.90 280.85 10 Km 126.80
Page 270 of 2191 Lead
BRICKS 0.00
65 Bricks (23 x11 x 7 cm) 2nd class -Non Modular TBSC-A.I-01 1 Nos 5.70 5.70 0.00
66 Modular Bricks 19 x 9 x 9 cms TBSC-A.I-02 1 Nos 6.70 6.70 0.00
67 Fly ash cement / lime solid blocks of 75 kg/sq.cm -290 x 225 x 140 TBSC-A.II-01 1 Nos 25.00 25.00 0.00
mm
68 Fly ash cement / lime solid blocks of 75 kg/sq.cm -290 x 200 x 140 TBSC-A.II-02 1 Nos 23.00 23.00 0.00
mm
69 Fly ash cement / lime solid blocks of 75 kg/sq.cm -290 x 150 x 140 TBSC-A.II-03 1 Nos 20.00 20.00 0.00
mm
70 Fly ash cement / lime solid blocks of 75 kg/sq.cm -290 x 112 / 100 x TBSC-A.II-04 1 Nos 14.00 14.00 0.00
140 mm
71 Fly ash cement / lime solid blocks of 75 kg/sq.cm -225 x 100 x 60 TBSC-A.II-05 1 Nos 8.00 8.00 0.00
mm
72 Fly ash cement / lime solid blocks of 75 kg/sq.cm - 145 x 225 x 140 TBSC-A.II-06 1 Nos 15.00 15.00 0.00
mm
73 Fly ash cement / lime solid blocks of 75 kg/sq.cm -145 x 200 x 140 TBSC-A.II-07 1 Nos 12.00 12.00 0.00
mm
72 Fly ash cement / lime solid blocks of 50 kg/sq.cm -290 x 225 x 140 TBSC-A.II-08 1 Nos 24.00 24.00 0.00
mm
73 Fly ash cement / lime solid blocks of 50 kg/sq.cm -290 x 200 x 140 TBSC-A.II-09 1 Nos 19.00 19.00 0.00
mm
74 Fly ash cement / lime solid blocks of 50 kg/sq.cm -290 x 150 x 140 TBSC-A.II-10 1 Nos 20.00 20.00 0.00
mm
Page 274 of 2191 Lead
75 Fly ash cement / lime solid blocks of 50 kg/sq.cm -290 x 112 / 100 x TBSC-A.II-11 1 Nos 11.00 11.00 0.00
140 mm
76 Fly ash cement / lime solid blocks of 50 kg/sq.cm -225 x 100 x 60 TBSC-A.II-12 1 Nos 6.00 6.00 0.00
mm
77 Fly ash cement / lime solid blocks of 50 kg/sq.cm - 145 x 225 x 140 TBSC-A.II-06 1 Nos 12.00 12.00 0.00
mm
78 Fly ash cement / lime solid blocks of 50 kg/sq.cm -145 x 200 x 140 TBSC-A.II-07 1 Nos 11.00 11.00 0.00
mm
1 The aggregate rates are inclusive of blasting charges of Rs.70/cum and 25% machine crushing charges. However , if the metal is obtained from hand broken , the blasting and cru
be deducted. The aggregate shall be HB Stone of Granite, Dolamite, Dolerite and Trap.( Quartzite and Basalt with aggregate Impact of Less than 20)
1 Bitumen 80/ 100 grade bulk at chennai ( VG-10 ) 32430 0 32430 0.00 chennai 545
2 Bitumen 60/70 grade bulk at chennai ( VG- 30 ) 37620 0 37620 0.00 chennai 545
3 Bitumen emulsion -RS (Rapid setting) - Bulk chennai 29280 0 29280 0.00 chennai 545
4 Bitumen emulsion -RS-1 (Rapid setting) - Bulk 26804 0 26804 0.00 Irrungattukottai 653
5 Bitumen emulsion -RS-2 (Rapid setting) - Bulk 27781 0 27781 0.00 Irrungattukottai 653
6 Bitumen emulsion -MS-(Medium setting) at Haldia - Bulk 26140 0 26140 0.00 Haldia 653
7 Bitumen emulsion -SS (Slow setting) - Bulk 26495 0 26495 0.00 Irrungattukottai 653
8 Bitumen emulsion -SS-1 (Slow setting) -chennai - Bulk 44800 0 44800 0.00 chennai 545
9 Bitumen emulsion -SS-2 (Slow setting) -chennai - Bulk 30940 0 30940 0.00 chennai 545
Note: Bitumen rate based on the HPCL -Price List for Oct-2017 and Emulsion rate based on Hindusthan Coal price list for Oct-17
Page 275 of 2191 Lead
MUNICIPALITY
ON - 2018 - 2019 SSR
Sep-18
t of Materials for the year 2018-19
Lead Charges
Total cost
in Rs.
Exclud'g
CP
733.00 1303.00
733.00 1303.00
733.00 1493.00
110.55 660.55
50.26 148.26
50.26 127.26
50.26 115.26
50.26 148.26
111.60 451.60
111.60 350.60
111.60 360.60
111.60 936.60
111.60 1300.60
111.60 591.60
111.60 615.60
111.60 1376.60
111.60 1125.60
111.60 937.60
111.60 661.60
111.60 1118.70
Page 277 of 2191 Lead
Lead Charges
Total cost
in Rs.
Exclud'g
CP
111.60 1406.20
111.60 1281.20
111.60 806.20
111.60 392.45
Page 278 of 2191 Lead
Lead Charges
Total cost
in Rs.
Exclud'g
CP
111.60 599.95
111.60 978.70
111.60 1031.45
111.60 1084.64
111.60 859.33
111.60 831.20
111.60 774.95
111.60 779.95
111.60 774.95
111.60 614.95
111.60 774.95
111.60 761.20
111.60 774.95
111.60 859.33
111.60 981.41
111.60 943.70
111.60 1024.95
111.60 897.86
111.60 2156.20
111.60 1084.95
111.60 859.95
111.60 774.95
111.60 993.70
111.60 1156.20
111.60 1194.95
Page 279 of 2191 Lead
Lead Charges
Total cost
in Rs.
Exclud'g
CP
111.60 1043.70
111.60 943.70
111.60 774.95
111.60 1131.61
111.60 864.95
110.55 945.40
111.60 989.33
111.60 958.16
111.60 1056.61
111.60 928.24
111.60 972.14
111.60 899.40
111.60 735.36
111.60 671.20
111.60 859.33
111.60 831.20
111.60 884.33
111.60 920.79
111.60 993.70
111.60 1060.79
111.60 1084.64
111.60 989.33
111.60 1175.58
111.60 1156.20
111.60 1043.70
Page 280 of 2191 Lead
Lead Charges
Total cost
in Rs.
Exclud'g
CP
111.60 774.95
111.60 774.95
111.60 943.70
111.60 1043.70
111.60 1194.95
111.60 1156.20
111.60 818.70
111.60 718.70
111.60 668.70
111.60 618.70
111.60 531.20
111.60 799.95
111.60 989.95
111.60 1144.95
111.60 1256.20
1172.83
111.60 1206.20
111.60 799.95
111.60 709.95
111.60 666.20
111.60 618.70
111.60 529.95
111.60 463.70
111.60 258.70
Page 281 of 2191 Lead
Lead Charges
Total cost
in Rs.
Exclud'g
CP
0.00 5.70
0.00 6.70
0.00 25.00
0.00 23.00
0.00 20.00
0.00 14.00
0.00 8.00
0.00 15.00
0.00 12.00
0.00 24.00
0.00 19.00
0.00 20.00
Page 282 of 2191 Lead
Lead Charges
Total cost
in Rs.
Exclud'g
CP
0.00 11.00
0.00 6.00
0.00 12.00
0.00 11.00
ng charges. However , if the metal is obtained from hand broken , the blasting and crushing charges shall
zite and Basalt with aggregate Impact of Less than 20)
MEN RATES
Lead
Charges Total cost
in Rs./ 1 MT
Incl. CP
817.50 33247.50
817.50 38437.50
817.50 30097.50
979.50 27783.50
979.50 28760.50
979.50 27119.50
979.50 27474.50
817.50 45617.50
817.50 31757.50
on Hindusthan Coal price list for Oct-17
KODADA MUNICIPALITY
DATA BASED ON SSR 2018-19 ( BASED ON MoRTH 5th Revision )
1 Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and
05
loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and
cross-sections, and transporting to the embankment location with all lifts and lead upto 1000 m as per
Technical Specification Clause 302.3 MORD / 301 MORTH
Unit = cum
Taking output = 360 cum
a) Labour
0 day Mate 510.00 day
2.080 day Mazdoor (Unskilled) 510.00 day
20% Add 20% MA on Labour charges
b) Machinery
3.60 hour Hydraulic excavator 0.9 cum bucket capacity @ 100 cum/ 2967.90 hour
hour
ii Unit = cum
Taking output = 600 cum
a) Labour
day Mate 540.00 day
3.120 day Mazdoor (Unskilled) 510.00 day
b) Machinery
9.000 hour Tractor with Tipper attachment 568.232
6.000 hour Motor grader for grading 3601.92
4.000 hour Water tanker 6 kl capacity 698.88
8.600 hour Three wheel 80-100 kN Static Roller @70 cum per hour
OR
7.500 hour Vibratory road roller 8-10 tonnes @ 80 cum per hour 2878.90
Per 1Cum
5 Construction of Granular sub-base by providing well graded/ close graded HBG material confirming to Grading
Table 400-1 including cost and conveyance of all materials to work site and spreading in uniform layers with motor g
or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at
and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as
MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge.
Unit = cum
Taking output = 225 cum
(A) Labour
0.48 nos. Mate 0.00 day
2.00 nos. Mazdoor skilled 540.00 day
10.00 nos. Mazdoor 510.00 day
Total
(B) Machinery
9.00 hr Wet mix plant of 75 tonne hr. capacity 1843.52 hr
6.00 hr Electric generating set 125 KVA 1478.40 hr
6.00 hr front end loader 1 cum capacity 1843.52 hr
6.00 hr Mechanical Paver finisher 100 TPH 2518.88 hr
3.90 hr Vibratory roller 8-10 T 2878.90 hr
3.00 hr Water tanker 698.88 hr
7920.00 Tkm Tipper (495Tonnes* 16kms) 6.00 Tkl
Total
(C) Material
89.10 cum 45 to 22.40mm IRC&MoRT&H HBG M/C metal@ 30% 1056.61 cum
118.80 cum 22.4 to 2.36 mm IRC&MoRT&H HBG M/C metal@40% 945.40 cum
89.10 cum 2.36 mm to 75 micron @ 30% (2.36mm & below) 774.95 cum
18.00 kl Water 98.00 kl
Total
Rate per 225 Cum
13.615% c&d) Overheads & Contractors Profit
9 Providing and applying prime coat with bitumen emulsion (SS2) Bulk using emulsion pressure distributor on prep
surface of granular base including clearing of road surface and spraying emulsion at the rate of 0.60 kg/sqm
emulsion pressure distributor for finished item of work etc., complete as per MoRT&H Specification 502 (5th revision
as directed by the Engineer-in-charge
Unit = Sqm
Taking output = 3500 sqm
a) Labour
0.080 day Mate 540.00 day
2.000 day Mazdoor 510.00 day
b) Machinery
2.800 hr Mechanical broom @ 1250 sqm per hour 399.84 hour
2.800 hr Air compressor 250 cfm 588.40 hour
2.000 hr Emulsion pressure distributor @ 1750 sqm per hour 963.20 hour
1.000 hr Water tanker 6 KL capacity @ 1 trip per hour 698.88 hour
c) Material
2.100 MT Bitumen emulsion @ 0.6 kg per sqm 45617.50 MT
6.000 Kl Cost of water 98.00 kl
a+b+c
Rate per 3500 Sqm
13.615% c&d) Overheads & Contractors Profit
10 Providing and applying tack coat with bitumen Emulsion (RS1) (Bulk) using Emulsion pressure distributor at the ra
0.20 kgs per sqm on the prepared bituminous surface cleaned with mechanical broom for finished item of work a
MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.
unit = Sqm
Taking output = 3500 sqm
(A) Labour
0.08 nos Mate 540.00 day
2.00 nos Mazdoor 510.00 day
Total
(B) Machinery
2.80 hr Mechanical broom Hydraulic @ 1250 sqm/hr. 399.84 hr
2.80 hr Air compressor 250 cfm 588.40 hr
2.00 hr Emulsion pressure distributor @1750 sqm/hr 963.20 hr
Total
(C) Material
0.70 MT Bitumen Emulsion @ 0.20 Kgs/sqm 30097.50 MT
Total
a+b+c
Rate per 3500 Sqm
13.615% c&d) Overheads & Contractors Profit
13 Providing and laying of Bituminous Macadam with 100 -120 TPH hot mix plant producing an average output
tonnes per hour using hard blasted granite crushed aggregates of Grading - II as per table 500-7 of MoR
specificaion 504 (5th Revision) premixed with bituminous binder of VG-30 grade @ 3.4 % by weight of total mix
transported to site, laid over a previously prepared surface with Hydrostatic paver finisher with sensor control t
required grade, level and alignment and rolled as per Clauses 501.6 and 501.7 to achieve the desired compactio
finished item of work as directed by the Engineer-in-Charge including hire and opeational charges all T&P and all
contingent charges necessary , complete and as per MoRTH specification No. 504 (5th Revision) .
ii) Aggregate
Total weight of mix = 450 tonnes
weight of bitumen - 15.3 tonnes
Weight of aggregate = 450-15.3 = 434.7 tonnes
Taking density of aggregate = 1.5 tonne/cum
Volume of aggregate = 289.8 cum
Grading - II (19 mm nominal size)
116.04 Cum of 25-10mm @ 40%
115.92 cum IRC & MORT&H HBG M/C chips 25 to 10mm @ 40% 1084.64 cum
115.92 cum IRC &MORT&H HBG M/C chips 10 to 5mm @ 40% 859.33 cum
57.96 cum IRC &MORT&H HBG M/C chips 5mm and below @ 20% 864.95 cum
Total
Rate per 205 Cum
13.615% c&d) Overheads & Contractors Profit
14 Providing and laying of Dense Graded Bituminous Macadam with 100 - 120 TPH batch type hot mix plant producin
average output of 75 tones per hour using hard blasted granite crushed aggregates of Grading - II as per table 50
of MoRT&H Specification 505 (5th revision) premixed with bituminous binder of VG 30 grade @ 4.50% of weight of
mixture, transported to site, laid over a previously prepared surface with a hydrostatic paver finisher with sensor cont
the required grade, level and alignment and rolled as per Clauses 501.6 and 501.7 to achieve the desired compactio
finished item of work as directed by the Engineer-in-Charge including hire and operational charges all T&P and all
contingent charges necessary including cost of (excluding seigniorage) charges of all materials etc., complete
respects as directed by Engineer-in-Charge and as per MoRT&H specification No. 505 (5th Revision)
3.90 hour Vibratory roller 8 tones for intermediate rolling 2878.90 hour
3.90 hour Finish rolling with 6-8 tones smooth wheeled tandem roller 1843.52 hour
7200.00 TKl Tipper 6.00 TKl
TOTAL B=
(C) Material
20.25 MT Wt. of Bitumen = 450 x 4.5/100 = 20.25 MT 38437.50 1.00
ii) Aggregate
TOTAL weight of mix = 450 tones
weight of bitumen = 450*4.5 / 100 = 20.25 tones
Weight of aggregate = 450-20.25 = 429.75 tones
Taking density of aggregate = 1.5 ton/cum
Volume of aggregate = 286.50 cum
Grading - II (19 mm nominal size)
85.95 cum IRC & MORT&H HBG M/C chips 25-10 mm @ 30 % 1084.64 cum
80.22 cum IRC & MORT&H HBG M/c Chips 10 - 5 mm @ 28 % 859.33 cum
114.60 cum IRC & MoRTH HBG M/C Chips 5mm & below @ 40 % 864.95 cum
5.73 cum Filler @ 2% of weight of aggregates. 614.95 cum
TOTAL C=
(A + B +C)
Rate per 195 Cum
13.615% c&d) Overheads & Contractors Profit
15 Providing and laying of Bituminous Concrete with 100 - 120 TPH batch type hot mix plant producing an average o
of 75 tones per hour using hard blasted granite crushed aggregates of Grading – II as per Table 500-17 of specific
507 of MoRT&H (5th revision), premixed with Bituminous binder of VG 30 Grade @ 5.4 % of mix and filler, transpo
the hot mix to work site, laying with hydrostatic sensor paver finisher to the required grade, level and alignment, r
with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification
(5th revision) complete for finished item of work in all respects as directed by Engineer-in-Charge
16 Providing , laying of close graded premix surfacing material ( Mixed seal surfacing) of 20 mm thickness by ho
plant using hard blasted granite crushed aggregates of 13.2 mm to 0.09 mm (Type 'B') as per table 500-1
specification 508 of MoRT&H (5th Revision), premixed with bituminous binder VG-30 (60/70) grade @ 19.00 Kg p
Sqm area, including cost of all materials and transporting the hot mix to work site, laying with mechanical paver fin
to the required grade, level and alignment, rolling with smooth wheeled roller 8 to 10 Tonnes as per MoRT&H
Revision) Specification No. 508 complete for finished item of work in all respects as directed by Engineer-in-charge.
5.00 nos. Skilled Mazdoor for checking line and levels. 540.00 day
Total
(B) Machinary
12.00 hr Hot mix plant 40 to 60 TPH 21414.40 hr
6.00 hr Generator 250 KVA 2072.00 hr
6.00 hr Front end loader 1 cum capacity 1843.52 hr
6.00 hr Paver finisher hydrostatic with sensor control 3426.65 hr
6.00 hr Smooth wheeled roller 8-10 Tonnes 1342.30 hr
17 Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone aggregate and fine aggre
conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, cente
machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P
complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed b
Engineer-in-Charge for base coarse below CC Pavement.
Unit = cum
Taking output = 15 cum
(A) Labour
0.64 nos Mate 540.00 day
1.00 nos Mason 540.00 day
15.00 nos Mazdoor 510.00 day
Total
(B) Material
13.50 cum Cost of 40mm SS-5 HBG M/C metal 799.95 cum
6.75 cum Sand 1303.00 cum
2.43 MT Cement at site 4600.00 MT
Total
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
2.00 hr Water tanker 6 KL 698.88 hr
Total
Rate per 15 Cum
13.615% c&d) Overheads & Contractors Profit
18 Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone aggregate and fine aggre
conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, cente
machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P
complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed b
Engineer-in-Charge for base coarse below CC Pavement.
Unit = Page331of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.64 nos Mate 540.00 day
1.00 nos Mason 540.00 day
15.00 nos Mazdoor 510.00 day
Total
(B) Material
13.50 cum Cost of 40mm SS-5 HBG M/C metal 799.95 cum
6.75 cum Sand 1303.00 cum
3.45 MT Cement at site 4600.00 MT
Total
© Machinery
1 RBR-CCPV-5: Construction of un-reinforced, plain cement concrete pavement, thickness as per design, ov
prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and
aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and approp
weigh batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing o
mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the con
with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation inclu
provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, near approa
to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, c
compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification C
1501 MORD.
Unit = cum
75.00 Cum Taking output = 75 cum (172.50 t)
(100 x 3.75 x 0.200)
a) Labour
0.00 day Mate 0
5.00 day Mason (1st class) 564
5.00 day Mason (2nd class) 540
150.00 day Mazdoor (Unskilled) 510
6.00 day Mazdoor (Skilled) 540
2.00 day Surveyor 0
6.00 day Mazdoor (Semi-Skilled) 510
1.00 day Blacksmith for cutting of dowel bars including removal of 0
burrs, fabrications & fixing of dowel bars.
b) Machinery
36.00 hour Concrete mixer 0.28 / 0.4 cum capacity (6 mixers) with weigh 397.5
batcher and suitable capacity calibrated water tank
9.00 hour Needle vibrator 0
9.00 hour Screed vibrator 0
9.00 hour Plate vibrator 374.2
4.00 hour Concrete joint cutting machine for initial & final cuts 0
5.00 hour Water tanker 6 kl capacity 698.88
2.00 hour Air Compressor (1 hour initial + 1 hour final) 0
c) Material
67.50 cum Crushed stone coarse aggregates, grading will be as per 1131.61
Clause 1501.2.4.1 (Table 1500.1) of specifications @ 0.90
cum/cum of concrete (25 mm & 12.5 mm blending)
33.75 cum Sand as per IS:383 and conforming to Clause 1500.2.4.2 @ 1303.00
0.45 cum/cum of concrete
26.25 t Cement @ 310 kg/cum of concrete 4750
412.50 sqm Polythene sheet 125 micron(ply) 17
Mild steel dowel bar 25 mm dia of grade S 240. 500 mm long
20 Nos. at culvert/bridge slab and at construction joint
including 5 per cent wastage.
0.118 t (4 x 20 x 0.500) + 5 per cent wastage = 42 m @ 2.80 kg per 0
m = 117.6 kg.
5.00 kg Bitumen primer @ 200 ml per joint for 23 joints -BMT-H.94 0
19.00 litre Bituminous sealant 800 ml per joint for 23 joints 600
Road data- MoRTH-5th Revision 447524687.xlsx 291
Quantity Description of Item Rate per
90.00 m Jute rope 12 mm dia including 5 per cent wastage 8.3
90.00 m Debonding strips 3.75 m (length) x 10 mm (width) x 5 mm 10
(thick) cut-out of rubber filler board or similar material
including 5 per cent wastage
483.00 No. Polythene sheathing, covering 2/3rd dowel bars (20x23) and 0
tight fit including 5 per cent wastage
122.00 litre Plasticizer 0.5 per cent by weight of cement - BMT-H.64 0
131.25 litre Curing compound (if used) @ 0.33 litre per sqm 0
18.00 kl Water for curing 0
3.00 sqm Joint filler board 20 mm thick as per IS:1838 818
(4 x 3.75 x 0.200 = 3 sqm) TBSC-Q.VIII-02
19 Vibrated cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggre
conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materia
site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental
operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500, 1700,
& 2702 (5th Revision) and as directed by the Engineer-in-Charge for C.C Pavement.
Unit = cum
Taking output = 15 cum
(A) Labour
0.86 nos Mate 540.00 day
1.50 nos Mason 540.00 day
20.00 nos Mazdoor 510.00 day
Total
(B) Material
8.10 cum Cost of 20mm SS-5 HBG M/C metal 1256.20 cum
5.40 cum Cost of 10mm SS-5 HBG M/C metal 989.95 cum
6.75 cum Sand 1303.00 cum
6.00 MT Cement at site 4600.00 MT
Total
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
Total
Total of A+B+C
(D) Form work
3.50 % Form work @ 3.50% on (A)+(B)+( C) 71279.40 Cum
Rate per 15 Cum
13.615% c&d) Overheads & Contractors Profit
Unit = cum
Taking output = 450 cum (990 Tonnes)
(A) Labour
1.12 nos Mate 540.00 day
6.00 nos Mazdoor Skilled 540.00 day
22.00 nos Mazdoor 510.00 day
Total
(B) Material
405.00 cum Crushed stone coarse aggregate of 25 mm and 12.5 mm 1175.58 cum
nominal sizes graded as per table 600-1 @ 0.90 cum/cum of
concrete conforming to clause 602.2.4.
(Average of 25 mm and 12 mm SS-5 HBG m/c metal)
203.00 cum Coarse Sand as per IS: 383 @ 0.45 cum/cum of concrete 1303.00 cum
67.50 MT Cement @ 150 kg/cum of concrete 4600.00 MT
(c) Machinery
6.00 hour Front end loader 1 cum bucket capacity 1843.52 hour
6.00 hour Cement concrete batch mix plant @ 75 cum per hour 1329.60 hour
6.00 hour Electric generator 100 KVA 1261.12 hour
6.00 hour Paver with electronic sensor 3426.65 hour
8.00 hour Vibratory roller 8-10 t capacity 2878.90 hour
8.00 hour Water tanker 6 KL capacity 698.88 hour
Total
Rate per 450 Cum
13.615% c&d) Overheads & Contractors Profit
21 Construction of un-reinforced, dowel jointed, plain cement concrete pavement M30 grade over a prepared sub base
43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggre
not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid w
fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contrac
expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debon
strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing com
for finished item of work as per MoRT&H (5th Revision) specification 1500,1700 & 602 (5th Revision) and as dir
by the Engineer-in-Charge
Unit = Cum
Taking output = 75 cum (172.5 tonne)
(A) Labour
day Mate 540.00 day
5 Day Mason (1st Class) 564.00 day
5 Day Mason (2nd Class) 540.00 day
150 Day Mazdoor (Unskilled) 510.00 day
6 Day Mazdoor (Skilled) 540.00 day
2 Day Surveyor 0.00 day
6 Day Mazdoor (Semi-Skilled) 510.00 day
1 Day Blacksmith for cutting of dowel bars including 0.00 day
removal of burrs, fabrications & fixing of dowel bars.
Road data- MoRTH-5th Revision 447524687.xlsx 293
Quantity Description of Item Rate per
(B) Machinery
36 Hour Concrete mixer 397.50 Hour
9 Hour Needle vibrator Hour
9 Hour Screed vibrator Hour
9 Hour Plate vibrator/Plate Compacter 48.00 Hour
5 Hour water tanker 6 kl capacity 698.88 Hour
2 Hour Air Compressor (1 hour intial + 1 hour final) 588.40 Hour
(C ) Material
67.5 Cum Crushed stone coarse aggregates, grading will be as per Cum
clause 1501.2.4.1 (Table 1500.1 ) of specification @ 0.90
cum/cum of concrete (20 mm & 12 mm belnding)
44.55 Cum 20mm metal 1256.20 Cum
22.95 Cum 12.0mm metal 1144.95 Cum
33.75 Cum sand as per IS:383 and conforming to clause 1303.00 Cum
26.25 t 1500.2.4.2
Cement @ @ 4000.45 cum/cum
kg/cum of concrete
of concrete 4600.00 t
412.5 sqm Polythene sheet 125 micron 17.00 sqm
0 0 Mild Stell dowel bar 25 mm dia of grade S 240.500 mm long 0
20 nos.at culve/bridge slab and at construction joint including
0.118 t 5 per cent wastage
(4x20x0.500)+5percent wastage=42m@2.80kg per t
5 kg m=117.6kg
Bitumen primer @ 200 ml per joint for 23 joints 78.00 kg
19 lts Bitumen sealant 800 ml per joint for 23 joint 109.00 lts
90 mt Jute rope 12 mm diaincluding 5 per cen wastage 0.00 mt
90 mt Debonding strips 3.75 m ( lengh) x 10 mm (Width) x 5 mm 0.00 mt
483 No (thick)
Polythene cut-out of rubber
sheathig, filler board
covering 2/3rd or similar
dowel basmaterial
(20x23) and 0.00 No
including
tight fit 5 per
includingcent
5 wastage
per cent wastage
18 Kl Water for curing 98.00 Kl
3 sqm Joint filler board 12.7mm / 18 mm thick as per 729.00 sqm
IS:1838(4x3.75x0.200 = 3 sqm)
d) Formwork @ 3% of (a+b+c)
Sub Total
13.615% ADD 13.615% Contrator profit.
Unit = cum
Taking output = 75 cum (172.50 t)
(100 x 3.75 x 0.200)
131.25 litre Curing compound (if used) @ 0.33 litre per sqm litre
18.00 kl Water for curing 98.00 kl
3.00 sqm Joint filler board 20 mm thick as per IS:1838 1022 sqm
(4 x 3.75 x 0.200 = 3 sqm)
d) Formwork @ 3% of (a+b+c) 3%
(B) Machinery
6.00 hr Hydraulic Excavator 1 cum bucket capacity @ 60 cum per 2967.90 hr
hour
Rate per 240 Cum
13.615% c&d) Overheads & Contractors Profit
23 Providing first class bedding with Granular material below the pipes of Hume pipe culverts suitably compac
rammed including cost and conveyance of materials to site etc., complete as per drawing and MoRT&H Specifica
2900 ( 5th Revision) and as directed by the Engineer-in-Charge.
Unit = cum
Taking output = 10 cum
(A) Labour
0.28 nos Mate 540.00 day
7.00 nos Mazdoor 0.00 day
Total
(B) Material
12.00 cum Cost of Granular material ( Gravel) 148.26 cum
Total
© Machinery
2.50 hr Plate compactor/Power rammer 53.76 hr
0.05 hr Water tanker 6 KL capacity 698.88 hr
Total
Rate per 10 Cum
13.615% c&d) Overheads & Contractors Profit
24 Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone aggregate and fine aggre
conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, cente
machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P
complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed b
Engineer-in-Charge for foundation.
Unit = cum
Taking output = 15 cum
(A) Labour
0.64 nos Mate 540.00 day
1.00 nos Mason 510.00 day
15.00 nos Mazdoor 0.00 day
Total
(B) Material
13.50 cum Cost of 40mm SS-5 HBG M/C metal 799.95 cum
6.75 cum Sand 1256.20 cum
3.45 MT Cement at site 1144.95 MT
Total
© Machinery
25 Providing Vibrated Cement Concrete (1:3:6) using 40mm size HBG crushed stone aggregate and fine aggre
conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, cente
machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P
complete for finished item of work as per MoRT&H specification 1500,1700, 2200 (5th Revision) and as directed b
Engineer-in-Charge for Body walls.
Unit = cum
Taking output = 15 cum
(A) Labour
0.64 nos Mate 540.00 day
1.00 nos Mason 510.00 day
15.00 nos Mazdoor 0.00 day
Total
(B) Material
13.50 cum Cost of 40mm SS-5 HBG M/C metal 799.95 cum
6.75 cum Sand 1256.20 cum
3.45 MT Cement at site 1144.95 MT
Total
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
2.00 hr Water tanker 6 KL capacity 698.88 hr
Total of A+B+C
(D) Form work
10.00 % Form work @ 10% on (A)+(B)+( C) 33370.92 Cum
Rate per 15 Cum
13.615% c&d) Overheads & Contractors Profit
26 Providing, laying Reinforced cement concrete Hume pipes of 1000mm / 800 mm / 600 mm Dia., NP-3 class for
culverts including cost and conveyance of Pipes etc., complete and Labour charges for laying, jointing of 1000 mm
mm / 600 mm dia. R.C.C Hume pipes in position including lifting, aligning, lowering and hoisting etc., as per drawing
as per MoRT&H Specification 2900, 2905 and 2906 (5th Revision) and IRC Special Publication No: 13 and as dire
by the Engineer-in-Charge for finished item of work.
Unit = metre
Taking output = 12.5 metre
600 mm Dia.,
(A) Labour
0.14 nos Mate 540.00 day
0.50 nos Mason 510.00 day
3.00 nos Mazdoor 0.00 day
Total
(B) Material
12.50 RM Cost of 600mm Dia., pipes ( As per Analysis sheet) 2530.23 RM
Total
Rate per 12.5 Rmt
13.615% c&d) Overheads & Contractors Profit
800 mm Dia.,
(A) Labour
0.18 nos Mate 540.00 nos.
0.50 nos Mason 510.00 nos.
4.00 nos Mazdoor 0.00 nos.
Total
(B) Material
12.50 RM Cost of 800mm Dia., pipes 4108.89 RM
Total
Rate per 12.5 Rmt
13.615% c&d) Overheads & Contractors Profit
1000 mm Dia.
(A) Labour
0.18 nos Mate 540.00 day
0.50 nos Mason 510.00 day
4.00 nos Mazdoor 0.00 day
Total
(B) Material
12.50 RM Cost of 1000mm Dia., pipes 6415.58 RM
Total
Rate per 12.5 Rmt
13.615% c&d) Overheads & Contractors Profit
27 Providing, laying Reinforced cement concrete Hume pipes of 1000mm / 800 mm / 600 mm Dia., NP-4 class for
culverts including cost and conveyance of Pipes etc., complete and Labour charges for laying, jointing of 1000 mm
mm / 600 mm dia. R.C.C Hume pipes in position including lifting, aligning, lowering and hoisting etc., as per drawing
as per MoRT&H Specification 2900, 2905 and 2906 (5th Revision) and IRC Special Publication No: 13 and as dire
by the Engineer-in-Charge for finished item of work.
800 mm Dia.,
(A) Labour
0.18 nos Mate 540.00 nos.
0.50 nos Mason 510.00 nos.
4.00 nos Mazdoor 0.00 nos.
1000 mm Dia.
(A) Labour
0.18 nos Mate 540.00 day
0.50 nos Mason 510.00 day
4.00 nos Mazdoor 0.00 day
Total
(B) Material
12.50 RM Cost of 1000mm Dia., pipes 8481.20 RM
Total
Rate per 12.5 Rmt
13.615% c&d) Overheads & Contractors Profit
28 Filling in between body walls with gravel including cost and conveyance of all materials to site etc., complete as
Clause 710.1.4 of IRC : 78 and as per MoRT&H Specification No. 2200 & 2907 (5th Revision) and as per Drawing
technical specifications for finished item of work.
Unit = cum, Page 462 of MoRT&H SDB
Taking output = 10 cum
(A) Labour
0.28 nos Mate 540.00 day
7.00 nos Mazdoor 0.00 day
Total
(B) Material
12.00 cum Cost of Gravel 148.26 cum
Total
© Machinery
2.50 hr Plate compactor/Power rammer/road roller 53.76 hr
0.05 hr Water tanker 6 KL capacity 698.88 hr
Total
Rate per 10 Cum
13.615% c&d) Overheads & Contractors Profit
29 Providing SS Revetment 300 mm thick including cost and conveyance of materials to site and including labour cha
for packing the stones for revetment etc., complete for finished item of work as per MoRT&H specification 2504
revision ) and as directed by the Engineer-in-Charge for Pitching of slopes
(A) LabourPage 522 of MoRT&H SDB
0.04 nos Mate 540.00 day
0.35 nos Mason 510.00 day
0.75 nos Mazdoor for laying stones, filling quarry spalls 0.00 day
Total
(B) Material
1.00 cum Cost of SS Revetment 300 mm 258.70 cum
Road data- MoRTH-5th Revision 447524687.xlsx 299
Quantity Description of Item Rate per
0.20 cum Cost of stone spalls 127.26 cum
Total
Rate per 1 Cum
13.615% c&d) Overheads & Contractors Profit
30 Providing and laying filter material with Gravel underneath pitching in slopes including cost and conveyan
materials to site including labour charges etc., complete for finished item of work as per MoRT&H Specification 250
Revision) and as directed by the Engineer-in-Charge
Unit = cum, Page 523 of MoRT&H SDB
Taking output = 1 Cum
(A) Labour
0.05 nos Mate 540.00 day
0.25 nos Mazdoor skilled 510.00 day
1.00 nos Mazdoor for laying stones, filling quarry spalls 0.00 day
Total
(B) Material
1.20 cum Cost of gravel 148.26 cum
Rate per 1 Cum
13.615% c&d) Overheads & Contractors Profit
31 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggre
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost
conveyance of all materials to site and all labour charges for machine mixing,laying in position, Compacting , Vibr
and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoR
Specification 1500,1700, 2100 (5th Revision) for footings and Raft foundation .
Unit = cum, Page 335 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos Mate 540.00 day
1.50 nos Mason 510.00 day
20.00 nos Mazdoor 0.00 day
Total
(B) Material
8.10 cum Cost of 40mm SS-5 HBG M/C metal 799.95 cum
4.05 cum Cost of 20mm SS-5 HBG M/C metal 1256.20 cum
Road data- MoRTH-5th Revision 447524687.xlsx 300
Quantity Description of Item Rate per
1.35 cum Cost of 10mm SS-5 HBG M/C metal 989.95 cum
6.75 cum Sand 1303.00 cum
4.13 MT Cement at site 4600.00 MT
Total
(C) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
Total of (A)+(B)+( C)
(D) Form work
4.00 % Form work @ 4% on (A)+(B)+( C) 49815.09 Cum
Rate per 15 Cum
13.615% c&d) Overheads & Contractors Profit
32 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggre
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost
conveyance of all materials to site and all labour charges for machine mixing, laying in position,Compacting, Vibr
and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoR
Specification 1500,1700, 2200 (5th Revision) for Sub structure .
Unit = cum, Page 335,455 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos Mate 540.00 day
1.50 nos Mason 510.00 day
20.00 nos Mazdoor 0.00 day
Total
(B) Material
8.10 cum Cost of 40mm SS-5 HBG M/C metal 799.95 cum
4.05 cum Cost of 20mm SS-5 HBG M/C metal 1256.20 cum
1.35 cum Cost of 10mm SS-5 HBG M/C metal 989.95 cum
6.75 cum Sand 1303.00 cum
4.13 MT Cement at site 4600.00 MT
Total
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
Total of (A)+(B)+( C)
(D) Form work
10.00 % Form work @ 10% on (A)+(B)+( C) 49815.09 Cum
Rate per 15 Cum
13.615% c&d) Overheads & Contractors Profit
33 Vibrated reinforced cement concrete M 20 grade using 20mm & 10mm HBG crushed stone aggregate (Co
aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance
materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incid
hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding co
steel and its fabrication charges for finished item as per MoRT&H specification 1500,1600,1700 & 2100 (5th revis
and as directed by the Engineer-in-Charge for for foundations
35 Vibrated reinforced cement concrete M 20 grade using 20mm & 10mm HBG crushed stone aggregate (Co
aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance
materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incid
hire and operational charges of all T&P etc., complete as per approved drawings and as directed during executio
excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1600,1700 &
(5th revision ) and as directed by the Engineer-in-Charge for Deck slab
(B) Material
8.10 cum Cost of 20mm SS-5 HBG M/C metal 1256.20 cum
5.40 cum Cost of 10mm SS-5 HBG M/C metal 989.95 cum
6.75 cum Sand 1303.00 cum
6.10 MT Cement at site 4600.00 MT
Total
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 1007.20 hr
2.25 nos Labour for cleaning deck slab concrete 0.00 day
Rate per 15 Cum
13.615% c&d) Overheads & Contractors Profit
37 Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBG crushed stone aggregate (Co
aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance
materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incid
and operational charges of all T&P etc., complete for finished item of work as per Approved drawing but excluding
of steel and its fabrication charges as per MoRT&H specification 1500, 1600,1700, & 2704 (5th Revision) an
directed by the Engineer-in-Charge for Approach slab.
(B) Material
8.10 cum Cost of 20mm SS-5 HBG M/C metal 1256.20 cum
5.40 cum Cost of 10mm SS-5 HBG M/C metal 989.95 cum
6.75 cum Sand 1303.00 cum
6.05 MT Cement at site 4600.00 MT
Total
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 1007.20 hr
Total
Total of (A)+(B)+( C)
(D) Form work
2.00 % Form work @ 2% on (A)+(B)+( C) 62254.40 Cum
38 Construction of precast VRCC railing of M20 grade using HBG crushed stone aggregate of size not exceeding 12
and fine aggregate conforming to table 1000-2 true to line and grade, tolerance of vertical RCC post not to exceed
500, centre to centre spacing between vertical posts not to exceed 2000mm, leaving adequate space between ve
posts for expansion including cost, conveyance of all materials to site and labour charges, centering, machine m
laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved draw
and as directed during execution but excluding cost of steel and its fabrication charges as per approved drawings
technical specifications for finished item of work as per MoRT&H Specification 2703, 1500, 1600, 1700 (5th Revision
39 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggre
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost
conveyance of all materials to site and all labour charges for machine mixing,laying in position, Compacting , Vibr
and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoR
Specification 1500,1700, 2100,2700 (5th Revision) for levelling course
Unit = cum, Page 335,500 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos Mate 540.00 day
1.50 nos Mason 510.00 day
20.00 nos Mazdoor 0.00 day
Total
(B) Material
8.10 cum Cost of 40mm SS-5 HBG M/C metal 799.95 cum
4.05 cum Cost of 20mm SS-5 HBG M/C metal 1256.20 cum
1.35 cum Cost of 10mm SS-5 HBG M/C metal 989.95 cum
6.75 cum Sand 1303.00 cum
4.13 MT Cement at site 4600.00 MT
Total
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 33 KVA 842.20 hr
Total
Rate per 15 Cum
13.615% c&d) Overheads & Contractors Profit
40 Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm size grouted with 0.20 cum o
(1:4:8) including cost and conveyance of materials to site and including labour charges for packing the stone
revetment etc., complete for finished item of work as per MoRT&H specification 2504 ( 5th revision ) and as directe
the Engineer-in-Charge for quadrential revetment.
Cost of CC(1:4:8), Page 331,522 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.64 nos Mate 540.00 day
1.00 nos Mason 510.00 day
15.00 nos Mazdoor 0.00 day
Total
(B) Material
13.50 cum Cost of 40mm SS-5 HBG M/C metal 799.95 cum
6.75 cum Sand 1303.00 cum
2.43 MT Cement at site 4600.00 MT
Total
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 33 KVA 842.20 hr
2.00 hr Water tanker 6 KL capacity 698.88 hr
Total
Cost per 15 cum
Rate for 1 cum
Cost of Grouted Revetment
Unit = Cum
41 Back filling behind Abutments with gravel including cost ,conveyance of all materials to site etc., complete as
Clause 710.1.4 of IRC : 78 and as per MoRT&H Specification No. 2200 (5th Revision) and as per Drawing and tech
specifications for finished item of work
Unit = cum, Page 335,500 of MoRT&H SDB
Taking output = 10 cum
(A) Labour
0.28 nos Mate 540.00 day
7.00 nos Mazdoor 0.00 day
Total
(B) Material
12.00 cum Cost of Granular material 148.26 cum
Total
© Machinery
2.50 hr Plate compactor/Power rammer/road roller 1303.00 hr
0.05 hr Water tanker 6 KL capacity 698.88 hr
Total
Rate per 10 Cum
13.615% c&d) Overheads & Contractors Profit
Rate per 10 Cum
Rate per 1 Cum
42 Providing and laying of filter media using 50% of 150 mm IRC soling stone and 50 % of 40 mm HBG m
satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to athickness of not less than 60
with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind
abutment, wing wall and return wall to the full height compacted to a firm condition including cost and conveyance an
labour charges as directed by the departmental officers as per drawing and Technical specifications as per c
710.1.1 of IRC:78 and Clause 2200 of MoRT&H (5th Revision) for finished item of work.
Unit = cum, Page 463 of MoRT&H SDB
Taking output = 10 cum
(A) Labour
0.32 nos Mate 540.00 day
7.00 nos Mazdoor for filling watering, ramming etc 0.00 day
1.00 nos Mazdoor skilled 540.00 day
Total
(B) Material
Filter media of stone aggregate conforming
to clause 2504.2.2 of MoRT&H
6.00 cum Cost of 150mm size IRC soling stone (HBG) 258.70 cum
6.00 cum Cost of 40mm size IRC HBG metal 799.95 cum
Total
(C) Machinery
43 Providing HYSD bars ( Fe-415 ) of different diameters, wrought and put up bars of all diameters including cost
conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding
tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling cha
and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for fini
item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specific
1600 & 2300 (5th revision) and as per I.S.1786 of 1985 for Super structure of R.C.C items.
44 Providing HYSD bars ( Fe-415 ) of different diameters, wrought and put up bars of all diameters including cost
conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding
tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling cha
and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for fini
item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specific
1600 & 2200 (5th revision) and as per I.S.1786 of 1985 for Sub structure of R.C.C items.
46 Providing Uncoated Mild Steel bars ( Fe-250 ) of different diameters, wrought and put up bars of all diameters inclu
cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, ben
binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire an
handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R
items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and a
MoRT&H specification 1600 & 2200 (5th revision) and as per I.S.1786 of 1985 .
47 Sand filling in foundation including cost and conveyence of all materials to site and watering, tamping etc., comple
finshed item of work as per MoRT&H specification 304 (5th Revision) and as directed by the Engineer - in - Charge.
Unit = cum Page 422 of MoRT&H SDB
g output = 1 cum
(A) Labour
0.01 day Mate 540.00 day
0.30 day Mazdoor 0.00 day
(B) Material
1.20 Cum Sand for filling 1303.00 cum
Total of (A)+(B)
13.615% c & d) Overheads & Contractors Profit
Rate per 1 Cum
Total of A+B+C
(D) Form work
4.00 % Form work @4% on (A)+(B)+( C) 49815.09
Total of A+B+C+D
13.615% c & d) Overheads & Contractors Profit
Rate for 15 Cum
Rate per 1 Cum
49 Vibrated reinforced cement concrete M 20 grade using 20mm & 10mm HBG crushed stone aggregate (Co
aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance
materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incid
hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding co
steel and its fabrication charges for finished item as per MoRT&H specification 1500,1600,1700 & 2200 (5th revis
and as directed by the Engineer-in-Charge for Cover slabs over side drains
50 Plastering in CM (1:5) 12 mm thick including cost and conveyance of all materials , labour charges , curing etc
complete for finished item of work as directed by the Engineer -in-Charge
Unit = 10 sqm Page 452 & 333 of MoRT&H SDB
output = 10 sqm
(A) Labour
0.04 day Mate 540.00 day
0.50 day Mason 510.00 day
0.50 day Mazdoor 0.00 day
(B) Material
0.144 Cum Cement Mortar (1:5) 2783.55 Cum
Total of A+B
13.615% c & d) Overheads & Contractors Profit
Rate for 10 Sqm
Rate per 1 Sqm
Sub-Analysis
Cement Mortar (1:5)
(a) Material
0.303 MT Cement 4600.00 1393.80
1.05 cum Sand for Mortar 1303.00 1368.15
(b) Labour
0.04 day Mate 540.00 21.60
0.90 day Mazdoor 0.00 0.00
Rate per cum 2783.55
51 Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfa
(A) Labour
0.12 day Mate 540.00 day
2.00 day Painter 648.00 day
1.00 day Mazdoor 0.00 day
(B) Material
6.00 Litres Paint Confirming to requirement of clause 803.3 190.00 Lit
Total of A+B
13.615% c & d) Overheads & Contractors Profit
Rate for 10 Sqm
Rate per 1 Sqm
52 Providing 25.4 mm thick Mastic pads for Expansion joints etc., complete for finished item of work.
53 Providing 12.7 mm thick Mastic pads for Expansion joints etc., complete for finished item of work.
54 Forming earthen shoulders with selective soils obtained from side earth having MDD of not less than 1.75 gms/c
mechnical means with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavati
soils at borrowed area, conveyance of soil, depositing the soils on the embankment, spreading soils, breaking c
sectioning and consolidation with vibratory road roller @ OMC to meet requirement of table 300-2 of MORT&H inclu
all hire and operational charges of T&P , complete for finished item of work as per MORT&H specification 305
revision) (Payment will be made based on levels for finished item of work)
Unit = cum
Taking output = 100 cum
(A) Labour
0.02 nos Mate 510.00 day
0.50 nos Mason unskilled 0.00 day
Total
(B) Material
1.67 hr Hydraulic Excavator 1 cum bucket capacity @ 60 cum per 2967.90 hr
hour
0.00 t.km Tipper 6.00 cum
Add 10% extra towards cost of carriage to cover cost of
0.50 hr loading
Dozer 80and
HPunloading
for spreading @ 200 cum per hour 2661.20 hr
4.00 hr Water tanker 6 KL 698.88 hr
1.00 hr Vibratory roller 8T 2878.90 hr
Total
6.00 hr Generator set 35 KVA 0.00 hr
Total of A+B
13.615% c & d) Overheads & Contractors Profit
Rate for 100 Cum
Rate per 1 Cum
55 Forming shoulders with borrowed useful seclected earth having MDD of not less than 1.75 gms/cc from outside
boundary by mechnical means with all leads and lifts including pre-watering of soil at borrow area, removal of top
excavation of soils at borrowed area, conveyance of soil, depositing the soils on the embankment, spreading
breaking clods, sectioning and consolidation with vibratory road roller @ OMC to meet requirement of table 300
MORT&H including all hire and operational charges of T&P , complete for finished item of work as per MOR
specification 305 (5th revision) (Payment will be made based on levels for finished item of work)
Unit = cum
Taking output = 100 cum
(A) Labour
0.04 nos Mate 510.00 day
1.00 nos Mason unskilled 0.00 day
Total
(B) Material
1.67 hr Hydraulic Excavator 1 cum bucket capacity @ 60 cum per 2967.90 hr
hour
1600.00 t.km Tipper ( 160 x 10Hrs ) 6.00 cum
Add 10% extra towards cost of carriage to cover cost of
loading and unloading
56 Dismantling of existing structures like culverts , bridges, retaining walls and other structures comprising of mas
cement, concrete, wood work , steel work, including T&P and scaffolding wherever necessary sorting the disma
material, disposal of unserviceable materials and stacking the materials with all lifts and lead of 1000 m ( By Mecha
means in Cement concrete grade M-15 & M-20) as per MoRTH specification 202 , 2.4 II (A) (5th revision)
57 Dismantling of existing structures like Stone Masonry in Cement Mortar by mechanical means including T&P
scaffolding wherever necessary sorting the dismantled material, disposal of unserviceable materials and stackin
materials with all lifts and lead of 1000 m as per MoRTH specification 202 , 2.4 III (B) (5th revision)
Page 23,24,25 of MoRT&H SDB
Unit = cum
Taking output = 1.25 cum
(A) Labour
0.03 nos Mate 540.00 day
0.75 nos Mazdoor for loading and unloding 0.00 day
Total
(B) Machinery
0.27 hour Tractor Trally 345.00 hr
Total
Total of A+B
13.615% c & d) Overheads & Contractors Profit
Rate for 1.25 Cum
Rate per 1 Cum
58 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and trees
upto 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of service
material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not excee
150 mm thickness by mechanical means in area of light jungle.
Unit = 1 sqm Page 22 & 23 of MoRT&H SDB
tput = 1 Hectare
(A) Labour
0.16 day Mate 540.00 day
4.00 day Mazdoor 0.00 day
Total
(B) Machinery
10.00 hr Dozer 80 HP with attachment for removal of trees & stumps. 2661.20 hr
59 Picking the existing BT surface 40 mm deep removal of picked up chips to road side spreading old useful metal to
surface , hand packing sectioning to propoer camber etc., including cost and conveyance of stone dust blindage @
cum /10 Sqm and spreading including watering rolling with 8 to 10 t capacity power roller complete for finished ite
work as directed by the Engineer-in-Charge
1.000 Sqm Picking rate as per SSR 2016-17 70.00 10 sqm
0.025 Cum Cost of Stone Dust for blindage 663.83 Cum
0.025 Cum Spreading charges of stone dust 230.00 10 Cum
1.000 Sqm Hire chages of Power Roller 6.65 Sqm
60 Dismantling of flexible pavements by mechanical means and disposal of dismantled materials up to a lead of
metres, stacking serviceable and unserviceable materials separately as directed by the Engineer-in-Charge and a
MoRTH specification 202 II (5th revision)
Page 23,24,25 of MoRT&H SDB
Unit = cum
Taking output = 1.00 cum
(A) Labour
0.01 nos Mate 540.00 day
0.30 nos Mazdoor 0.00 day
Total
(B) Machinery
0.38 hour Tractor Trally 345.00 hr
0.017 hour Farm tractor with ripper @ 60 cum per hour 588.40 hr
Total
Total of A+B
13.615% c & d) Overheads & Contractors Profit
Rate for 1.00 Cum
Rate per 1 Cum
61 Providing weep holes in VCC Abutments, Return walls and wing walls with 100mm Diameter AC pipe extending thr
the full width of the structure at 1.00m C/C in both horizontal and vertical direction so that the weep holes in
horizontal direction is staggered from the weep holes laying above and below lines as shown in drawing including
and conveyance of the A.C pipes and labour charges for cutting to required length, placing the pipe with a slope of a
1V : 20H towards stream side face etc., complete for finished item of work for weep holes as per MoRT&H specific
2706 & 2200 (5th Revision)
Labour
0.04 nos Mate 540.00 day
0.90 nos Mazdoor 0.00 day
(B) Labour
0.03 nos Mate 540.00 day
0.50 nos Mason 648.00 day
0.25 nos Mazdoor 0.00 day
Total
Rate per 30 Rmt
13.615% c&d) Overheads & Contractors Profit
62 Supplying and laying of seperation membrane 125 micron and as per ISI standard specification duly fixing over CC(1
including cost, conveyance of all materials etc., complete and as directed by the Engineer-in-Charge during executi
work.
Rate as per SoR 2017-18
Rate per 1 Sqm
63 Excavation in hilly areas in hard rock requiring blasting by mechanical means for road cutting ., complete inclu
trimming of slopes for finished item of work as per MoRT&H specification 301(5th Revision) and as directed b
Engineer-in-Charge duly disposing of excavated earth on valley side.
(B) Machinery
6.00 hr Dozer 80 HP (D -80 A 12) @ 28.32 cum/hr 2661.20 hr
5.00 hr Air complressor 250 cfm with 2 jack hammer @ 20 cum/hr 588.40 cum
(C) Material
35.00 kg Gelatine 80 per cent ( Explosive small dia) Sno.26-Irrigation 75.00 Kg
140.00 Nos Electric detonators @ 1 Detonator for 2 Gelatine sticks of 8.00 No
125 gms each
Total of A+B + C
13.615% c & d) Overheads & Contractors Profit
Rate for 170 Cum
Rate per 1 Cum
64 Supplying and fixing of CI Drainage spouts complete as per MoRT&H specification No. 2705 (5th Revision) and a
drawing Sd/205
Unit = 1 No.
(A) Labour
For fabrication
0.02 nos Mate 540.00 day
0.02 nos Skilled (Blaksmith, Welder etc.) 600.00 day
0.02 nos Mazdoor 0.00 day
5.00 % Add 5% for cost of material & labour for Electrodes, cutting 1275.60
gas, Anti corrossive bituminous paint, Mild steel grating etc.,
Total of A+B + C
13.615% c & d) Overheads & Contractors Profit
Rate for 1No
65 Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less
40 kg each complete as per drawing and MoRTH specification 2503.2 (5th revision)
Unit = 1 Cum
(A) Labour
0.04 nos Mate 540.00 day
0.35 nos Mason 540.00 day
0.75 nos Mazdoor 0.00 day
(B) Material
1.00 cum Cost of Jeddy Stone 450 mm to 600 mm thick 392.45 cum
0.20 cum Cost of Stone spalls 127.26 cum
Total of A+B
13.615% c & d) Overheads & Contractors Profit
Rate for 170 Cum
Rate per 1 Cum
72 Providing B.T. patch work for pot holes using 40 to 45mm HBG metal with required quantity of 10 to 12mm size
key chips and 42 Kgs of 80/100 grade bitumen per one cum of work for filling the pot holes including removal of l
material in the pot holes trimming the edges to provide form vertical faces cleaning applying tack coat filling the pot h
compacting and finishing including cost and conveyance of materials, T&P charges and all labour charges fo
operations etc., complete for finished item of work as directed by the Engineer-in-charge in the following reaches.
Unit : Cum
Taking out put = 1 Cum
(A) Labour
2.86 day Mazdoor unskilled 0.00 day
(B) Machinery
0.27 hr Power road roller 8 T for initial breakdown rolling 1342.30 hr
(C) Material
1.20 cum 40 mm IRC HBG m/c Chips 799.95 cum
0.13 cum 9.5 to 11.2 mm IRC HBG m/c Chips 962.83 cum
0.042 MT 80/100 grade Bitumen 32828.85 MT
Total of A+B + C
73 Providing B.T. patch work for pot holes using 20 mm HBG machine crushed metal with required quantity of
12mm size HBG key chips and 80/100 grade bitumen at 72 Kgs / 1 cum of work for filling the pot holes inclu
removal of loose material in the pot holes, trimming the edges to provide form vertical faces, cleaning, applying tack
filling the pot holes compacting with power Road roller of 8 to 10 T and finishing including cost and conveyan
materials T&P charges and all labour charges for all operations etc., complete for finished item of work as directed b
Engineer-in-charge in the following reaches.
Unit : Cum
Taking out put = 1 Cum
(A) Labour
2.86 day Mazdoor unskilled 0.00 day
(B) Machinery
0.27 hr Power road roller 8 T for initial breakdown rolling 1342.30 hr
(C) Material
1.20 cum 20 mm IRC HBG m/c Chips 1256.20 cum
0.13 cum 9.5 to 11.2 mm IRC HBG m/c Chips 962.83 cum
0.072 MT 80/100 grade Bitumen 32828.85 MT
Total of A+B + C
13.615% c & d) Overheads & Contractors Profit
Rate for 170 Cum
Rate per 1 Cum
74 Imporatation of good quality red earth congenial for plants grouth of light textured, crystalline, porous and fri
generally acidic or neutral but not alkaline, fertile, cost, transportation, loading, unloading etc complete
1.00 cum Good red earth 115.26 cum
13.615% c & d) Overheads & Contractors Profit
Rate per 1 Cum
75 Spreading of sludge farm yard manure or/ and good earth in required thickness (cost of sludge, farm yard manure o
good earth to be paid for separately) Specification 307 MORTH
Unit = cum
Taking output = 15 cum
a) Labour
0 No Mate 540.00 day
1.040 No Mazdoor (Unskilled) 0.00 day
76 Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Constructi
granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, m
by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired de
complete as per Clause 401.4 as per Technical Specification Clause 408 MORD.
77 RBR-TSRA-12 : Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Bead
Bituminous Surface : Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflecto
glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IR
.The finished surface to be level, uniform and free from streaks and holes as per Specification 803 MORTH
Unit = sqm
Taking output = 600 sqm
a) Labour
0.00 Nos Mate 540.00 day
0.78 Nos Mazdoor 510.00 day
b) Machinery
10.00 hour Road marking machine @ 60 sqm per hour 124.32 hour
0.50 hour Tractor-trolley 464.80 hour
c) Material
1500.00 Litre Hot applied thermoplastic compound 211 Litre
150.00 kg Reflectorising glass beads 229 kg
79 RBR-FNDN-4 : B-i : .Providing concrete for plain/reinforced concrete in open foundations using 40 mm nominal
Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curin
14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 17
2100 MORTH. : P.C.C grade M 15 (Design Mix) MORTH 12.8 A using 40 mm Graded Metal
Unit = cum
(a) Material
0.275 MT Cement 4600.00 MT
0.45 cum Coarse sand 1303.00 cum
0.54 cum 40 mm aggregate 799.95 cum
0.27 cum 20 mm aggregate 1256.20 cum
0.09 cum 10 mm aggregate 989.95 cum
(b) Labour
0.00 day Mate 540.00 day
0.10 day Mason (1st Class) 600.00 day
1.39 day Mazdoor (Unskilled) 510.00 day
(c) Machinery
0.40 hour Concrete mixer 0.4/0.28 cum capacity 472.60 hour
0.40 hour Generator 33 KVA 842.20 hour
80 RBR-FNDN-4 : G : .Providing concrete for Reinforced concrete in open foundations using 20 mm nominal size Gr
hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14
complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 &
MORTH. : R.C.C. grade M 30 Design Mix, using 20 mm Graded Metal (MORTH 12.8 G) for Base slab of Box cul
Unit = cum
(a) Material
0.407 MT Cement 4600.00 MT
0.45 cum Coarse sand 1303.00 cum
0.54 cum 20 mm aggregate 1256.20 cum
0.36 cum 10 mm aggregate 989.95 cum
(b) Labour
0.00 day Mate 540.00 day
0.10 day Mason (1st Class) 600.00 day
1.39 day Mazdoor (Unskilled) 510.00 day
(c) Machinery
0.40 hour Concrete mixer 0.4/0.28 cum capacity 472.60 hour
0.40 hour Generator 33 KVA 842.20 hour
Unit = cum
(a) Material
0.41 MT Cement 4600.00 MT
0.45 cum Coarse sand 1303.00 cum
0.54 cum 20 mm aggregate 1256.20 cum
0.36 cum 10 mm aggregate 989.95 cum
(b) Labour
0.00 day Mate 540.00 day
0.10 day Mason (1st Class) 600.00 day
1.39 day Mazdoor (Unskilled) 510.00 day
(c) Machinery
0.40 hour Concrete mixer 0.4/0.28 cum capacity 472.60 hour
0.40 hour Generator 33 KVA 842.20 hour
82 Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate (Co
aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance
materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incid
hire and operational charges of all T&P etc., complete as per approved drawings and as directed during executio
excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1600,1700 &
(5th revision ) and as directed by the Engineer-in-Charge for Deck slab
Amount
h hydraulic excavator of 0.9 cum bucket capacity including cutting and
and side slopes, in accordance with requirements of lines, grades and
the embankment location with all lifts and lead upto 1000 m as per
3 MORD / 301 MORTH
0.00
1060.80
###
10684.44
0.00
15066.00
0.00
26811.24
3650.35
30461.59
84.62
0.00
1591.20
5114.09
21611.52
2795.52
###
21591.75
2352.00
55056.08
7495.89
62551.97
104.25
91.3
-34.2
0.00
57.10
###
ding well graded/ close graded HBG material confirming to Grading - III
all materials to work site and spreading in uniform layers with motor grader
mixing by mix in place method with Rotavator / approved means at OMC
eve the desired density etc., complete for finished item of work as per
nd as directed by the Engineer-in-charge.
0.00
1296.00
4080.00
5376.00
21611.52
5671.68
2096.64
17273.40
0.00
0.00
0.00
46653.24
115493.95
37197.60
156229.92
1764.00
310685.47
362714.71
49383.61
412098.32
1373.66
0.00
1080.00
5100.00
6180.00
###
16591.68
8870.40
11061.12
15113.28
11227.71
2096.64
47520.00
112480.83
94143.95
112313.52
69048.05
1764.00
277269.52
395930.35
53905.92
449836.27
1999.27
###
43.20
1020.00
1063.20
1119.55
1647.52
1926.40
698.88
5392.35
95796.75
588.00
96384.75
102840.30
102840.30
14001.71
43.20
1020.00
1063.20
1119.55
1647.52
1926.40
4693.47
21068.25
21068.25
26824.92
26824.92
3652.21
30477.13
8.71
dam with 100 -120 TPH hot mix plant producing an average output of 75
e crushed aggregates of Grading - II as per table 500-7 of MoRT&H
ith bituminous binder of VG-30 grade @ 3.4 % by weight of total mixture,
epared surface with Hydrostatic paver finisher with sensor control to the
ed as per Clauses 501.6 and 501.7 to achieve the desired compaction for
neer-in-Charge including hire and opeational charges all T&P and all other
as per MoRTH specification No. 504 (5th Revision) .
453.60
8160.00
2700.00
11313.60
162429.12
1294.48
20559.91
12432.00
11061.12
5234.97
11227.71
7189.73
43200.00
588093.75
###
###
###
###
###
125731.47
99613.53
50132.50
863571.25
1149513.89
156506.32
1306020.21
6370.83
inous Macadam with 100 - 120 TPH batch type hot mix plant producing an
rd blasted granite crushed aggregates of Grading - II as per table 500-10
premixed with bituminous binder of VG 30 grade @ 4.50% of weight of total
usly prepared surface with a hydrostatic paver finisher with sensor control to
olled as per Clauses 501.6 and 501.7 to achieve the desired compaction for
neer-in-Charge including hire and operational charges all T&P and all other
of (excluding seigniorage) charges of all materials etc., complete in all
nd as per MoRT&H specification No. 505 (5th Revision)
2700.00
11313.60
162429.12
20559.91
12432.00
11061.12
5234.97
11227.71
7189.73
43200.00
273334.56
778359.38
###
93224.81
68935.45
99123.27
3523.66
1043166.57
1327814.73
1327814.73
180781.98
1508596.71
7736.39
e with 100 - 120 TPH batch type hot mix plant producing an average output
te crushed aggregates of Grading – II as per Table 500-17 of specification
h Bituminous binder of VG 30 Grade @ 5.4 % of mix and filler, transporting
tic sensor paver finisher to the required grade, level and alignment, rolling
ollers to achieve the desired compaction as per MoRT&H Specification 507
ork in all respects as directed by Engineer-in-Charge
453.60
8160.00
162429.12
20559.91
12432.00
11061.12
5234.97
11227.71
7189.73
230134.56
###
###
934031.25
###
###
###
84603.62
60969.46
105553.31
3490.46
1188648.10
1430096.26
1430096.26
194707.61
1624803.87
8506.83
453.60
7140.00
2700.00
10293.60
256972.80
12432.00
11061.12
20559.91
8053.80
748570.31
244738.33
993308.64
1302388.27
177320.16
1479708.43
144.36
mix using 40mm size HBG crushed stone aggregate and fine aggregate
ding cost, conveyance of all materials to site and labour charges, centering,
c., including all other incidental and operational charges of all T&P etc.,
T&H specification 1500,1700, 2100 (5th Revision) and as directed by the
C Pavement.
345.60
540.00
7650.00
8535.60
10799.33
8795.25
11178.00
30772.58
2835.60
5053.20
1397.76
9286.56
48594.74
6616.17
55210.91
3680.73
mix using 40mm size HBG crushed stone aggregate and fine aggregate
ding cost, conveyance of all materials to site and labour charges, centering,
c., including all other incidental and operational charges of all T&P etc.,
T&H specification 1500,1700, 2100 (5th Revision) and as directed by the
C Pavement.
345.60
540.00
7650.00
8535.60
10799.33
8795.25
15870.00
35464.58
0.00
0.00
0.00
472.60
472.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
729.00
0.00
0.00
510.00
0.00
0.00
0.00
0.00
600.00
Road data- MoRTH-5th Revision 447524687.xlsx 330
Amount
0.00
10.00
0.00
0.00
0.00
0.00
0.00
3.00%
464.40
810.00
10200.00
11474.40
10175.22
5345.73
8795.25
27600
51916.2
2835.60
5053.20
7888.80
71279.40
2494.78
73774.18
10044.35
83818.53
5587.90
604.80
3240.00
11220.00
15064.80
476109.90
264509.00
310500.00
1051118.90
###
11061.12
7977.60
7566.72
20559.91
23031.20
5591.04
75787.59
1141971.29
155479.39
1297450.68
2883.22
plain cement concrete pavement M30 grade over a prepared sub base with
nd fine aggregate conforming to IS 383, maximum size of coarse aggregate
nd mixing plant as per approved mix design, transported to site, laid with a
ed and finished in a continuous operation including provision of contraction,
s, joint filler, separation membrane, sealant primer, joint sealant, debonding
ed, curing compound, finishing to lines and grades as per drawing complete
Revision) specification 1500,1700 & 602 (5th Revision) and as directed
0.00
2820.00
2700.00
76500.00
3240.00
0.00
3060.00
0.00
14310.00
0.00
0.00
432.00
3494.40
1176.80
19413.20
0.00
55963.71
26276.60
43976.25
120750.00
7012.50
0.00
0.00
390.00
2071.00
0.00
0.00
0.00
1764.00
2187.00
260391.06
368124.26
11043.73
379167.99
51623.72
430791.71
5743.89
0.00
2820.00
2700.00
76500.00
3060.00
1800.00
3240.00
564.00
0.00
17013.60
1950.30
3150.00
0.00
0.00
3494.40
3228.80
0.00
0.00
42396.75
34348.50
7012.50
0.00
153.23
0.00
1482.00
0.00
0.00
0.00
0.00
0.00
1764.00
3066.00
209744.08
6292.32
216036.40
29413.36
245449.76
3272.66
172.80
0.00
172.80
17807.40
17980.20
2448.00
20428.20
85.12
151.20
0.00
151.20
1779.12
1779.12
134.40
34.94
169.34
2099.66
285.87
2385.53
238.55
mix using 40mm size HBG crushed stone aggregate and fine aggregate
ding cost, conveyance of all materials to site and labour charges, centering,
c., including all other incidental and operational charges of all T&P etc.,
T&H specification 1500,1700, 2100 (5th Revision) and as directed by the
345.60
510.00
0.00
855.60
10799.33
8479.35
3950.08
23228.76
) using 40mm size HBG crushed stone aggregate and fine aggregate
ding cost, conveyance of all materials to site and labour charges, centering,
., including all other incidental and operational charges of all T&P etc.,
T&H specification 1500,1700, 2200 (5th Revision) and as directed by the
345.60
510.00
0.00
855.60
10799.33
8479.35
3950.08
23228.76
2835.60
5053.20
1397.76
9286.56
33370.92
3337.09
36708.01
4997.80
41705.81
2780.39
e Hume pipes of 1000mm / 800 mm / 600 mm Dia., NP-3 class for pipe
pes etc., complete and Labour charges for laying, jointing of 1000 mm / 800
ition including lifting, aligning, lowering and hoisting etc., as per drawing and
nd 2906 (5th Revision) and IRC Special Publication No: 13 and as directed
work.
###
###
75.60
255.00
0.00
330.60
31627.88
31627.88
31958.48
4351.15
36309.63
97.20
255.00
0.00
352.20
51361.13
51361.13
51713.33
7040.77
58754.10
4700.33
###
97.20
255.00
0.00
352.20
80194.75
80194.75
80546.95
10966.47
91513.42
7321.07
e Hume pipes of 1000mm / 800 mm / 600 mm Dia., NP-4 class for pipe
pes etc., complete and Labour charges for laying, jointing of 1000 mm / 800
ition including lifting, aligning, lowering and hoisting etc., as per drawing and
nd 2906 (5th Revision) and IRC Special Publication No: 13 and as directed
work.
75.60
255.00
0.00
330.60
36640.38
36640.38
36970.98
5033.60
42004.58
3360.37
97.20
255.00
0.00
62625.88
62625.88
62978.08
8574.47
71552.55
5724.20
97.20
255.00
0.00
352.20
106015.00
106015.00
106367.20
14481.89
120849.09
9667.93
cluding cost and conveyance of all materials to site etc., complete as per
T&H Specification No. 2200 & 2907 (5th Revision) and as per Drawing and
ork.
151.20
0.00
151.20
1779.12
1779.12
134.40
34.94
169.34
2099.66
285.87
2385.53
238.55
uding cost and conveyance of materials to site and including labour charges
omplete for finished item of work as per MoRT&H specification 2504 ( 5th
Charge for Pitching of slopes
21.60
178.50
0.00
200.10
258.70
Road data- MoRTH-5th Revision 447524687.xlsx 338
Amount
25.45
284.15
484.25
65.93
550.18
550.18
per I cum
21.60
178.50
0.00
200.10
133.40
258.70
25.45
284.15
417.55
56.85
474.40
474.40
27.00
127.50
0.00
154.50
177.91
332.41
45.26
377.67
377.67
crete using 40mm , 20mm and 10mm size HBG crushed stone aggregate
0-1 and fine aggregate conforming to table 1000-2) including cost and
bour charges for machine mixing,laying in position, Compacting , Vibrating
ll other operational charges of T&P required etc., complete as per MoRT&H
for footings and Raft foundation .
464.40
765.00
0.00
1229.40
6479.60
5087.61
Road data- MoRTH-5th Revision 447524687.xlsx 339
Amount
1336.43
8795.25
18998.00
40696.89
2835.60
5053.20
7888.80
49815.09
1992.60
51807.69
7053.62
58861.31
3924.09
crete using 40mm , 20mm and 10mm size HBG crushed stone aggregate
0-1 and fine aggregate conforming to table 1000-2) including cost and
abour charges for machine mixing, laying in position,Compacting, Vibrating
ll other operational charges of T&P required etc., complete as per MoRT&H
for Sub structure .
464.40
765.00
0.00
1229.40
6479.60
5087.61
1336.43
8795.25
18998.00
40696.89
2835.60
5053.20
7888.80
49815.09
4981.51
54796.60
7460.56
62257.16
4150.48
grade using 20mm & 10mm HBG crushed stone aggregate (Coarse
e aggregate conforming to table 1000-2) including cost, conveyance of all
ng, machine mixing, laying, vibrating, curing etc., including other incidental
r approved drawings and as directed during execution but excluding cost of
em as per MoRT&H specification 1500,1600,1700 & 2100 (5th revision )
r for foundations
464.40
765.00
10175.22
5345.73
8795.25
23552.00
47868.20
2835.60
5053.20
7888.80
56986.40
2279.46
59265.86
8069.05
67334.91
4488.99
0.00
51.00
0.00
51.00
753.72
296.99
586.35
1577.80
3214.86
189.04
402.88
591.92
3857.78
525.24
4383.02
154.31
4012.09
546.25
4558.34
4558.34
grade using 20mm & 10mm HBG crushed stone aggregate (Coarse
e aggregate conforming to table 1000-2) including cost, conveyance of all
ng, machine mixing, laying, vibrating, curing etc., including other incidental
complete as per approved drawings and as directed during execution but
ges for finished item as per MoRT&H specification 1500,1600,1700 & 2300
eer-in-Charge for Deck slab
0.00
51.00
0.00
51.00
678.35
356.38
586.35
1596.20
3217.28
189.04
402.88
154.41
4014.61
546.59
4561.20
4561.20
486.00
765.00
0.00
1251.00
10175.22
5345.73
8795.25
28060.00
52376.20
2835.60
6043.20
8878.80
0.00
62506.00
8510.19
71016.19
4734.41
grade using 20mm & 10mm HBG crushed stone aggregate (Coarse
e aggregate conforming to table 1000-2) including cost, conveyance of all
g, machine mixing, laying, vibrating, curing etc., including all other incidental
plete for finished item of work as per Approved drawing but excluding cost
MoRT&H specification 1500, 1600,1700, & 2704 (5th Revision) and as
ach slab.
464.40
765.00
0.00
1229.40
###
###
10175.22
5345.73
8795.25
27830.00
52146.20
2835.60
6043.20
8878.80
62254.40
1245.09
464.40
765.00
0.00
1229.40
9274.10
5345.73
8795.25
23552.00
46967.08
2835.60
6043.20
8878.80
57075.28
6849.03
63924.31
8703.29
72627.60
4841.84
1879.12
278.80
278.80
cum
cum
###
cum
cum
rete using 40mm , 20mm and 10mm size HBG crushed stone aggregate
0-1 and fine aggregate conforming to table 1000-2) including cost and
bour charges for machine mixing,laying in position, Compacting , Vibrating
ll other operational charges of T&P required etc., complete as per MoRT&H
ision) for levelling course
464.40
765.00
0.00
1229.40
6479.60
5087.61
1336.43
8795.25
18998.00
40696.89
2835.60
5053.20
7888.80
49815.09
6782.32
56597.41
3773.16
stone (HBG) of not less than 300 mm size grouted with 0.20 cum of CC
materials to site and including labour charges for packing the stones for
work as per MoRT&H specification 2504 ( 5th revision ) and as directed by
ment.
345.60
510.00
0.00
855.60
10799.33
8795.25
11178.00
30772.58
2835.60
5053.20
1397.76
9286.56
40914.74
2727.65
21.60
178.50
0.00
200.10
sand
545.53
350.60
896.13
1096.23
149.25
1245.48
1245.48
151.20
0.00
151.20
1779.12
1779.12
3257.50
34.94
3292.44
5222.76
711.08
5933.84
593.38
172.80
0.00
540.00
712.80
1552.20
4799.70
6351.90
diameters, wrought and put up bars of all diameters including cost and
ges for fabrication of reinforcement including cutting, bending, binding rods,
lete including cost and conveyance of binding wire and all handling charges
ver lapping welding if required etc., complete for all R.C.C items for finished
r the directions of the Engineer-in-Charge and as per MoRT&H specification
786 of 1985 for Super structure of R.C.C items.
237.60
1692.00
0.00
1929.60
48300.00
400.00
48700.00
50629.60
6893.22
57522.82
57.52
diameters, wrought and put up bars of all diameters including cost and
ges for fabrication of reinforcement including cutting, bending, binding rods,
lete including cost and conveyance of binding wire and all handling charges
ver lapping welding if required etc., complete for all R.C.C items for finished
r the directions of the Engineer-in-Charge and as per MoRT&H specification
786 of 1985 for Sub structure of R.C.C items.
183.60
1128.00
0.00
1311.60
48300.00
300.00
48600.00
49911.60
6795.46
56707.06
56.71
216.00
1128.00
0.00
1344.00
48300.00
300.00
48600.00
49944.00
6799.88
56743.88
56.74
151.20
846.00
0.00
997.20
48300.00
300.00
48600.00
49597.20
6752.66
56349.86
56.35
conveyence of all materials to site and watering, tamping etc., complete for
ation 304 (5th Revision) and as directed by the Engineer - in - Charge.
5.40
0.00
5.40
1563.60
1569.00
213.62
1782.62
1 cum
464.40
765.00
0.00
1229.40
6479.60
5087.61
1336.43
8795.25
18998.00
40696.89
2835.60
5053.20
7888.80
49815.09
1992.60
51807.69
7053.62
58861.31
3924.09
1 Cum
grade using 20mm & 10mm HBG crushed stone aggregate (Coarse
ne aggregate conforming to table 1000-2) including cost, conveyance of all
ng, machine mixing, laying, vibrating, curing etc., including other incidental
r approved drawings and as directed during execution but excluding cost of
em as per MoRT&H specification 1500,1600,1700 & 2200 (5th revision )
r Cover slabs over side drains
464.40
765.00
0.00
1229.40
10175.22
5345.73
8795.25
23552.00
47868.20
2835.60
5053.20
7888.80
56986.40
2279.46
21.60
255.00
0.00
276.60
400.83
677.43
92.23
769.66
76.97
###
###
64.80
1296.00
0.00
1360.80
1140.00
2500.80
340.48
2841.28
71.03
991.000
1Sqm
ls obtained from side earth having MDD of not less than 1.75 gms/cc by
ding pre-watering of soil at borrow area, removal of top soil, excavation of
depositing the soils on the embankment, spreading soils, breaking clods,
ad roller @ OMC to meet requirement of table 300-2 of MORT&H including
omplete for finished item of work as per MORT&H specification 305 (5th
vels for finished item of work)
10.20
0.00
10.20
4956.39
0.00
0.00
1330.60
2795.52
2878.90
11961.41
0.00
11971.61
1629.93
13601.54
136.02
clected earth having MDD of not less than 1.75 gms/cc from outside road
and lifts including pre-watering of soil at borrow area, removal of top soil,
eyance of soil, depositing the soils on the embankment, spreading soils,
with vibratory road roller @ OMC to meet requirement of table 300-2 of
charges of T&P , complete for finished item of work as per MORT&H
be made based on levels for finished item of work)
20.40
0.00
20.40
4956.39
9600.00
960.00
1330.60
2795.52
2878.90
22521.41
0.00
22541.81
3069.07
10.80
162.00
0.00
172.80
910.33
93.15
1003.48
1176.28
160.15
1336.43
1069.14
1 Cum
e Masonry in Cement Mortar by mechanical means including T&P and
dismantled material, disposal of unserviceable materials and stacking the
per MoRTH specification 202 , 2.4 III (B) (5th revision)
16.20
0.00
16.20
93.15
93.15
109.35
14.89
124.24
99.39
1 Cum
uprooting rank vegetation, grass, bushes, shrubs, sapling and trees girth
earlier and disposal of unserviceable materials and stacking of serviceable
of 1000 m including removal and disposal of top organic soil not exceeding
ea of light jungle.
86.40
0.00
86.40
26612.00
7.00
16.596
0.000
0.000
23.60
23.60
5.40
0.00
5.40
131.10
10.00
141.10
146.50
19.95
166.45
166.45
turn walls and wing walls with 100mm Diameter AC pipe extending through
in both horizontal and vertical direction so that the weep holes in each
ep holes laying above and below lines as shown in drawing including cost
charges for cutting to required length, placing the pipe with a slope of about
plete for finished item of work for weep holes as per MoRT&H specification
2346.00
1368.15
3714.15
21.60
0.00
21.60
9198.00
292.00
390.00
186.79
10066.79
16.20
324.00
0.00
340.20
10406.99
1416.91
11823.90
394.13
e 125 micron and as per ISI standard specification duly fixing over CC(1:4:8)
c., complete and as directed by the Engineer-in-Charge during execution of
17.00
17.00
264.60
0.00
1296.00
169.50
1730.10
15967.20
2942.00
18909.20
2625.00
1120.00
3745.00
24384.30
3319.92
27704.22
162.97
complete as per MoRT&H specification No. 2705 (5th Revision) and as per
10.80
12.00
0.00
22.80
5.40
5.40
0.00
10.80
33.60
178.00
536.00
138.00
390.00
1242.00
63.78
1339.38
1395.78
190.04
1585.82
bed for protection against scour with stone boulders weighing not less than
TH specification 2503.2 (5th revision)
21.60
189.00
0.00
210.60
392.45
25.45
417.90
628.50
85.57
714.07
714.07
0.00
0.00
362.42
362.42
959.94
125.17
1378.81
2463.92
2826.34
0.00
0.00
362.42
362.42
1507.44
125.17
1632.61
3265.22
3627.64
493.90
4121.54
4121.54
genial for plants grouth of light textured, crystalline, porous and friable,
ile, cost, transportation, loading, unloading etc complete
115.26
15.69
130.95
d good earth in required thickness (cost of sludge, farm yard manure or/and
ation 307 MORTH
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1339.20
21611.52
40269.00
4140.00
3494.40
69514.92
22772.74
141684.48
2940.00
167397.22
238251.34
32437.92
270689.26
902.30
0.00
397.80
397.80
1243.20
232.40
1475.60
316500.00
34350.00
350850.00
352723.40
48023.29
400746.69
667.91
with Lens Reflector : Providing and fixing of road stud 100 x 100 mm die
of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic
of 600 mm and bedded in a suitable bituminous grout or epoxy mortar, all as
0.00
530.40
16200.00
1620
18350.40
2498.41
20848.81
1265.00
586.35
431.97
339.17
89.10
0.00
60.00
708.90
189.04
336.88
4006.41
160.26
4166.67
567.29
4733.96
4733.96
1872.20
586.35
678.35
356.38
0.00
60.00
708.90
189.04
336.88
4788.10
167.58
4955.68
674.72
5630.40
5630.40
1872.20
586.35
678.35
356.38
0.00
60.00
708.90
189.04
336.88
4788.10
478.81
5266.91
717.09
5984.00
5984.00
grade using 20mm & 10mm HBG crushed stone aggregate (Coarse
e aggregate conforming to table 1000-2) including cost, conveyance of all
ng, machine mixing, laying, vibrating, curing etc., including other incidental
complete as per approved drawings and as directed during execution but
ges for finished item as per MoRT&H specification 1500,1600,1700 & 2300
eer-in-Charge for Deck slab
464.40
900.00
10200.00
11564.40
10175.22
5345.73
8795.25
28060.00
52376.20
2835.60
RBR- Loosening of the ground upto a level of 300 mm below the subgrade level, watered, grad
2 EECD- compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construc
16-ii per Technical Specification Clause 303.5.2 MORD / 305 MORTH.
Unit = cum
Taking output = 600 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 3.12
b) Machinery
Tractor with ripper attachment hour 9.00
Motor grader for grading hour 6.00
Water tanker 6 kl capacity hour 4.00
Three wheel 80-100 kN Static Roller @70 hour 8.60
cum per hour
OR
Vibratory road roller 8-10 tonnes @ 80 cum hour 7.50
per hour
c) Material
Water kl 24.00
Providing, laying, spreading and compacting graded stone aggregate to wet mix ma
specification including premixing the material with water at OMC in mechanical mixer (Pu
RBR- carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base cour
5 SBBS- well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vib
11 Roller 80-100 kN weight to achieve the desired density including lighting, barricadi
maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification
406 MORD / MORTH.
B R&B and Urban Area Works :
Unit = cum
Taking output = 225 cum (495 tonnes)
a) Labour
Mate day -
Mazdoor skilled day 2.48
Mazdoor day 10.00
b) Machinery
Wet mix plant of 75 tonne hourly capacity hour 9.00
Electric generator 125 KVA hour 6.00
Front end loader 1 cum capacity hour 6.00
Paver finisher hour 6.00
Vibratory roller 8 - 10 tonne hour 3.90
or
Smooth 3 wheeled steel roller @ 8-10 tonnes. hour
22.50
Water tanker 6 KL capacity hour 3.00
Tipper 10t (495Tonnes* 10kms) t.km 4950.00
c) Material ( Table 400-11)
45 mm to 22.4 mm@ 30 per cent cum 89.10
22.4 mm to 2.36 mm @ 40 per cent cum 118.80
2.36 mm to 75 micron@ 30 per cent cum 89.10
Cost of water KL 18.00
c) Material
Bitumen emulsion @ 0.6 kg per sqm t 2.100
Requirement of Water KL 6.000
Providing and laying bituminous macadam with 100-120 TPH / 40-60 TPH hot mi
producing an average output of 75 tonnes/ 37.50 t per hour using crushed aggregates of sp
grading premixed with bituminous binder, transported to site, laid over a previously pr
RBR- surface with paver finisher to the required grade, level and alignment and rolled as per
BASC-
3=ii 501.6 and 501.7 to achieve the desired compaction as per Tech. specification No. 504 MOR
Unit = cum
Taking output = 205 cum (450 tonnes)(VG-
30)
a) Labour
Mate day -
Mazdoor working with HMP, mechanical day 14.00
broom, paver, roller, asphalt cutter and
assistance for setting out lines, levels and
layout of construction
Skilled mazdoor for checking line & levels day 5.84
b) Machinery
Batch mix HMP 100-120 TPH @ 75 tonne hour 6.00
per hour actual output
OR
HMP 40-60 TPH @ 17 cum (37.5 Tonnes) / hour
hour 12.00
Air compressor 250 cfm hour 2.20
Paver finisher 100 TPH hour 6.00
Generator 250 KVA hour 6.00
Front end loader 1 cum bucket capacity hour 6.00
Smooth wheeled roller 8-10 tonnes for initial hour 3.90
break down rolling.
Vibratory roller 8 tonnes for intermediate hour 3.90
rolling.
Finish rolling with 6-8 tonnes smooth wheeled hour 3.90
tandem roller.
c) Material
i) Bitumen@ 3.3 per cent of mix t 14.85
weight of mix = 205 x 2.2 = 450 tonne
ii) Aggregate
Total weight of mix = 450 tonnes
Weight of bitumen = 14.85 tonnes
Weight of aggregate = 450 -14.85 = 435.15
tonnes
Taking density of aggregate = 1.5 ton/cum
Unit = cum
Taking output = 191 cum (450 tonnes)(VG-
30)
a) Labour
Mate day -
Mazdoor (Unskilled) working with HMP, day 16.000
mechanical broom, paver, roller, asphalt
cutter and assistance for setting out lines,
levels and layout of construction
Skilled mazdoor for checking line & levels day 5.840
b) Machinery
Batch mix HMP @ 75 tonne per hour hour 6.000
Paver finisher hydrostatic with sensor control hour 6.000
@ 75 cum per hour
Generator 250 KVA hour 6.000
Front end loader 1 cum bucket capacity hour 6.000
Tipper 10 tonne capacity t.km 4500.000
Add 10 per cent of cost of carriage to cover
cost of loading and unloading
Smooth wheeled roller 8-10 tonnes for initial hour 3.900
break down rolling.
Vibratory roller 8 tonnes for intermediate hour 3.900
rolling.
Finish rolling with 6-8 tonnes smooth wheeled hour 3.900
tandem roller.
c) Material
i) Bitumen@ 5 per cent of weight of mix t 22.500
ii) Aggregate
Total weight of mix = 450 tonnes
Weight of bitumen = 22.5 tonnes
Weight of aggregate = 450 -22.50 = 427.50
tonnes
Taking density of aggregate = 1.5 ton/cum
Manufacture, Supply and Delivery of Unplasticised PVCs Pipes for potable water su
conforming to IS : 4985/2000 (3rd revision) with bell ends (Socket) as per specification i
10 Grey/Natural Ivory Grey/ Any other Color (except White) inclusive of transportation to th
divisional stores anywhere in TG excluding Taxes.
510.00 1060.80
2967.90 10684.44
1004.40 15066.00
26811.24
3650.35
30461.59
84.62
510.00 1591.20
568.23 5114.07
3601.92 21611.52
698.88 2795.52
21591.75
2878.90
98.00 2352.00
55056.06
7495.88
62551.94
104.25
57.10
123.00
180.10
540 1296
510 4080
3601.92 21611.52
2878.9 17273.40
472.64 5671.68
698.88 2096.64
0.00 0.00
0.00 0.00
859.33 115493.95
774.95 37197.60
774.95 156229.92
98 1764.00
362714.71
49383.61
412098.32
1373.66
1843.52 16591.68
1478.40 8870.4
1843.52 11061.12
2518.88 15113.28
2878.90 11227.71
0 0
698.88 2096.64
6 29700
1056.61 94143.95
945.40 112313.52
774.95 69048.05
98.00 1764.00
378369.55
51515.01
429884.56
1910.60
510.00 1060.80
399.84 1119.55
1358.70 3804.36
1677.76 3355.52
698.88 698.88
31757.50 66690.75
98.00 588.00
77317.86
10526.83
87844.69
25.10
sqm as per clause 502.8. Payment shall
on between this quantity and the actual
RS-1)using emulsion pressure distributor
uminous/granular surface cleaned with
TH
510.00 1060.80
399.84 1119.55
1358.70 3804.36
963.20 1926.40
30097.50 21068.25
28979.36
3945.54
32924.90
9.41
510.00 7140.00
540.00 3153.60
0.00 0.00
21414.40 256972.80
1358.70 2989.14
2518.88 15113.28
2072.00 12432.00
1843.52 11061.12
1342.30 5234.97
2878.90 11227.71
1843.52 7189.73
38437.50 570796.88
1156.20 33541.36
1194.95 34665.50
1043.70 30277.74
943.70 27376.74
0.00
943.70 54753.47
774.95 44962.60
0.00
774.95 22481.30
774.95 22481.30
1173851.23
159819.85
1333671.08
6505.71
y for 3 hours as per norms of output, but
ot mix
se. Theplant and
actual paver will
quantity will take six hours
depend upon
r miscellaneous duties at site including
f the
of contractor.
Mechanical broom and 2 mazdoors for
in the cost of tack coat.
TPH batch type hot mix plant producing
ggregates of specified grading, premixed
ller, transporting the hot mix to work site,
ontrol to the required grade, level and
tandem rollers to achieve the desired
omplete
510.00 8160.00
540.00 3153.60
0.00
24268.16 145608.96
3426.65 20559.90
2072.00 12432.00
1843.52 11061.12
6.00 27000.00
1342.30 5234.97
2878.90 11227.71
1843.52 7189.73
38437.50 864843.75
993.70 84961.35
859.33 61227.26
774.95 94970.12
4600.00 39652.00
1397282.47
190240.01
1587522.48
8311.64
rs as per norms of output, but the same
se.plant
Theand paver
actual will take
quantity six hours
will depend for
upon
miscellaneous duties at site including
n the
f contractor. broom and 2 mazdoors
of mechanical
eofused
tack for
coat.
construction i.e. 37.5-25 mm,
dingly the quantities
calculated from the should be amended
total weight of dry
eight of filler will also be 2 per cent by
sides of foundations and basement with
ng each deposited layer by watering and
site and all operational, incidental, labour
em of work. (APSS NO. 309 & 310)
Cum
148.26 889.56
540.00 0.00
510.00 158.10
1047.66
142.638909
1190.30
198.38
198.38
234 234
31.8591
265.86
375 of 2191 3. Cental Light
KODADA MUNICIPALITY
Construction of Divider and central lighting
Estimate for providing Central lighting in the Median
S.No Description of Work Nos L Qty Rate Per Amount
40mm Nominal Bore medium grade G.I.Pipe 1 x 1 500 500 Rmt 477.18 1 Rmt 238590.00
12 ELEC-3.5.1: Supply & Installtion of Automatic Street Light
Control System with Optical Sensor, Low volatage / High voltage
trip and reset, operating voltage 150 - 280V AC, 50 HZ with
suitable SMC enclousure of IP 54 protection, MCBs and contactor
suitable to control the load of 3 KW of single phase load with
necessary clamping arrangements. Makes : Swadeep Nature
Switch / Light Mate.
1 x 5 5 No 31812.20 1 No 159061.00
379 of 2191 3. Cental Light
180W Street light lamps 2 x 250 500 Nos 19574.73 1 Nos 9787365.00
380 of 2191 3. Cental Light
18 Supply of 63A 4 Way Connector 1 x 500 500 Nos 219.28 1 Nos 109640.00
19 Supply and Run of No.8 SWG G.1 wire including cost of all
accessories
and labour charges etc., complete.
1 x 2250 2250 Rmt 50.00 1 Rmt 112500.00
20 Fabrication supply and errection of water tight M.S junction Box
260 x 300 x 140 mm (depth) size and 16 guage MS sheet with
fixing arrangements, with necessary holes for cable entry and
exit from the box. The box shall be provided with cover and
hinges on one side and bolting at other end. The box shall be
fixed by clamps fabricated from 25mm x 3mm MS flat. The box
consisting of 2 Nos of MCB and 1 No of 60 AMPS ‘L’ way
consider doubl arm and box shall be painted with one coat of
Red Oxide and two coats aluminium paint including
transportation etc., complete for finished item of work.
Input
381 of 2191 3. Cental Light
21 Painting with Aluminium paint Two Coats - Old Iron Work : in all
to give an even shade after thourughly brushing the surface to
remove all dirt and remains of loose powdered materials,
including cost and conveyance of all materials to work site and
all operational, incidental, labour charges etc. complete for
finished item of work
a) Material
ELEC- 63mm and Inner dia 51mm double walled mts 1.00 117
117.00
4.8.1 (b) corrugated HDPE duct
Excavation of earth 100 x 0.3 X 0.9 m cum 0.23 185.64 41.77
Pipe laying cost mt 1.00 18 18.00
176.77
Add over heads & contractor profit @ 0.14 24.07
Total Rs 200.84
Supply and Transportation of Outer dia 50 mm
and Inner dia 38 mm double walled corrugated
HDPE duct made as per specification BSEN -
8 500 86/IS 14930 Part-II. Makes:DURA LINE
(Dura Guard) or its equivalent make.51mm dia
DWC pipe
a) Material
ELEC- 50mm and Inner dia 38mm double walled mts 1.00 91
91.00
4.8.1 (a) corrugated HDPE duct
91.00
Add over heads & contractor profit @ 0.14 12.39
Total Rs 103.39
Supply and fixing of Automatic Street Light
Control System with Optical Sensor, Low
volatage / High voltage trip and reset, operating
voltage 380 - 450 V AC, 50 HZ with suitable
SMC enclousure of IP 54 protection, MCBs of
ELEC- Legrand / Schneider / L&T / Siemens of 10KA
9
3.5.2(d) C/D curve and Contactor suitable to control the
load of 12KW three phase load with necessary
clamping arrangements. Makes : Swadeep
Nature Switch / Light Mate / L&T / Siemens /
Bajaj.
12 KW 1 17600.00 no 17,600.00
a) Material
Excavation of earth 100 x 0.3 X 0.9 m cum 27.00 185.64 5,012.28
TBSC-A.I- Cost of bricks (Civil SSR) 23 x 11 x 7 1000 0.92
01 Nos
NOS 519.00 5.7 2,958.30
Cost of sand (Civil SSR) cum 6.00 570 3,420.00
Cement (Civil SSR) Kg 25.00 4.75 118.75
ELEC- Cable root Indicators of size 152mm round / each 12.00 88
1,056.00
9.1.25 102mm x 102mm /
50Sq.mm 3 ½ core PVC armoured U.G cable mts 100.00 266
ELEC-4.1.2 1100V grade with ISI mark following strand/solid
(801)i)
26,600.00
aluminium conductor
Transportation charges of bricks and sand LS 1.00 10 10.00
b) Labour charges for laying cable.
Man Mazdoor for spreading the sand and back each 2.50 425
1,062.50
filling the excavated soil.
Skilled Electrician day 1.00 540 540.00
Helper day 2.00 450 900.00
dayindicators
Man Mazdoor for concreting and embedding of cable way 2.00 425
850.00
Sundires and Rounding off
Add labour allowance 0.2 3352.5 670.50
43,198.33
Add contractor profit 14% 0.13615 5,881.45
Rate per each 49,079.78
Rate per 100mts 490.80
Supply and laying of 16 Sqmm 4 Core XLPE
insulated, 1100V grade armoured alluminium
ELEC- cable as per specification confirming to IS:7098
11
4.1.1 (F) (Part - I). Makes : Torrent / Universal / Unicab /
Polycab / Havells / Gloster / KEI or equivalent
2 Cutting open C.C. road surface including stacking of excavated materials for pipe line trench work. as directed by the
departmental officers.
Rate as per PH SSR item no 25b,Pg.6 1 Cum 2169.00 1 Cum
Add for Municipal Allowance at 20% on 60% 0% 2169.00
Overheads & Contractors Profit 13.615%
Total
VAT & Labour cess. 0%
Rate per 1 Cum Rs
3 Cutting open water bound macadam road including soiling and stacking of excavated materials for pipe line trench
work. as directed by the departmental officers.
Rate as per PH SSR item no 25 c,Pg.6 1 Cum 267.00 1 Cum
Add for Municipal Allowance at 20% on 60% 0% 267.00
Overheads & Contractors Profit 13.615%
Total
VAT & Labour cess. 0%
Rate per 1 Cum Rs
4 BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and
depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such
as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308).
Ordinary Soil-Manual Means-Upto 3 m out put 10.00 Cum
depth
a) Labour
Mate (Labour -R&B-Second Class S.No-71) 0 day 540.00 1 day
Mazdoor (Labour -Irrigation-Unskilled-S.No.3) 3.64 day. 510.00 1 day.
exclud-MA
Add Labour component @ 0%
Sub total
extra for foundations @ 0%
Sub - Total
c&d) Overheads & Contractors Profit 13.615%
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/10
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 1 Cum excluding Dewatering Rs
Page 390 of 2191 data-Bld-18-19
5 BLD-CSTN-2-8 (16) : Filling with HBG chips 2.36mm and below in trenches, sides of foundations and basement with
initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including
cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc.,
complete for finished item of work. (APSS NO. 309 & 310)
Sand Filling out put 6.00 Cum
a) Material
Stone crusher dust finer than 3mm (C-Mat-S.No1) 6.00 Cum 774.95 1 Cum
Sand Filling in Foundations
b) Labour
Mate (Labour -R&B-Second Class S.No-71) 0.00 day 540.00 1 day
Mazdoor (Labour-Irrigation-Unskilled S.No1) 0.31 day 510.00 1 day
Sub Total
b&c) Overheads & Contractors Profit 13.615%
Cost for 6 cum = a+b+c
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per cum = (a+b+c)/6
Rate per 1 Cum
5 BLD-CSTN-2-8 (16) : Filling with gravel in trenches, sides of foundations and basement with initial lead in layers
not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete
for finished item of work. (APSS NO. 309 & 310)
Quarry rubish out put 6.00 Cum
a) Material
gravel (C-Mat-S.No6) 6.00 Cum 148.26 1 Cum
b) Labour
Mate (Labour -R&B-Second Class S.No-71) 0.00 day 540.00 1 day
Stone dust filling
6 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix
(1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage
charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top
surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:
Cement-(C.Memo.No.146/Cement&Steel 162.00 Kg 4.60 1 Kg
Coarse aggregate 20mm metal ( C-Mat- S.No-58) 0.90 Cum 1256.20 1 Cum
Fine aggregate (Sand) ( C-Mat-S.N.2 ) 0.45 Cum 1303.00 1 Cum
Water (including for curing) -M-189-a. irrigation 1.20 Kl 98.00 1 Kl
SSR
B.MACHINARY
Page 391 of 2191 data-Bld-18-19
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity 1 hour 397.50 1 hour
(Hire Charges-Irrigation S.No16)
C. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11) 0.10 day 564.00 1 day
Mazdoor (Labour-Irrigation-Unskilled S.No1) 1.39 day 510.00 1 day
Sub - Total Rs
c.Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Add Labour Cess @ 0%
Grand Total
Rate per One Cum Rs
7 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete M20 grade nominal
mix(Cement : fine aggregate: coarse aggregate ) using Coarse aggregate 20mm size graded Metal including cost
and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all
materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the
required level curing etc., complete for finished item of work with nomonal reinforcement
Unit : 1cum
A. MATERIALS:
Cement-(C.Memo.No.146/Cement&Steel 330.00 Kg 4.60 1 Kg
Coarse aggregate 20mm graded (C-Mat-S.No:48) 0.90 Cum 1172.83 1 Cum
Fine aggregate (Sand) ( C-Mat-S.N.2 ) 0.45 Cum 1303.00 1 Cum
Water (including for curing) -M-189-a. irrigation 1.20 Kl 98.00 1 Kl
SSR
B.MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity 1 hour 397.50 1 hour
(Hire Charges-Irrigation S.No16)
B. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11) 0.10 day 564.00 1 day
Mazdoor (Labour-Irrigation-Unskilled S.No1) 1.39 day 510.00 1 day
Sub - Total Rs
c.Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Add Labour Cess @ 0%
Grand Total
Rate per One Cum Rs
Divider base slab
basic rate 1.00 cum 4440.29
Add centering charges @ 4%
8 BLD-CSTN-3-12-(29) Using Concrete mixture up to Plinth Level : Plain Cement concrete (M 15) Nominal Mix
1:2.5:5 (Cement : fine aggregate: coarse aggregate ) using 40, 20 & 10mm size Hard Granite Machine Crushed
Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site ,
seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers,
finishing top surface to the required level curing etc., complete for finished item of work.
Unit : 1cum
A. MATERIALS:
Cement-(C.Memo.No.146/Cement&Steel 275.00 Kg 4.60 1 Kg
Coarse aggregate 40mm metal ( C-Mat- S.No-58) 0.54 Cum 799.95 1 Cum
Coarse aggregate 20mm metal (C-Mat-S.No:56) 0.27 Cum 1256.20 1 Cum
Coarse aggregate 10mm metal (C-Mat-S.No:54) 0.09 Cum 989.95 1 Cum
Fine aggregate (Sand) ( C-Mat-S.N.2 ) 0.48 Cum 1303.00 1 Cum
Water (including for curing) -M-189-a. irrigation 1.20 Kl 98.00 1 Kl
SSR
B.MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity 1 hour 397.50 1 hour
(Hire Charges-Irrigation S.No16)
Add labour allowance on crew charges 1 hour 0.00 1 hour
B. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11) 0.10 day 564.00 1 day
Mazdoor (Labour-Irrigation-Unskilled S.No1) 1.39 day 510.00 1 day
Sub - Total Rs
c.Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Add Labour Cess @ 0%
Grand Total
Rate per One Cum Rs
1 BLD-CSTN-3-12-(29) Using Concrete mixture up to Plinth Level : Plain Cement concrete (M 15) Nominal Mix
1:2.5:5 (Cement : fine aggregate: coarse aggregate ) using 20mm graded metal of Hard Granite Machine Crushed
Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site ,
seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers,
finishing top surface to the required level curing etc., complete for finished item of work.
Unit : 1cum
A. MATERIALS:
Cement-(C.Memo.No.146/Cement&Steel 275.00 Kg 4.60 1 Kg
Coarse aggregate 20mm metal (C-Mat-S.No:56) 0.27 Cum 1172.83 1 Cum
B. LABOUR: 0.48 Cum 1303.00 1 Cum
Mason 1st class (labour-Irrigation.S.N.11) 1.20 Kl 98.00 1 Kl
B.MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity 1 hour 397.50 1 hour
(Hire Charges-Irrigation S.No16)
Add labour allowance on crew charges 1 hour 0.00 1 hour
B. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11) 0.10 day 564.00 1 day
Mazdoor (Labour-Irrigation-Unskilled S.No1) 1.39 day 510.00 1 day
Sub - Total Rs
c.Overheads & Contractors Profit 13.615%
Sub - Total
Page 393 of 2191 data-Bld-18-19
Add VAT @ 0%
Add Labour Cess @ 0%
Grand Total
Rate per One Cum Rs
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity 1.000 hour 397.50 1 hour
(Hire Charges-Irrigation S.No16)
a Footings
M-20 Nominal mix 1.00 Cum 5935.18 1 Cum
Centering charges ,Pg No.108 to 111 of Bld.SSR 1.00 Cum 288.00 1 Cum
b Pedastals
M-20 Nominal mix 1.00 Cum 5935.18 1 Cum
Page 394 of 2191 data-Bld-18-19
Centering charges ,Pg No.108 to 111 of Bld.SSR 1.00 Cum 328.00 1 Cum
Labour charges Pg No.108 to 111 of Bld.SSR 1.00 Cum 1004.00 1 Cum
Add Labour component on Labour charges @ 1.00 Cum 1004.00 1 Cum
Sub - Total
Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per One Cum Rs
c Plinth beams
M-20 Nominal mix 1.00 Cum 5935.18 1 Cum
Centering charges ,Pg No.108 to 111 of Bld.SSR 1.00 Cum 1390.00 1 Cum
Labour charges Pg No.108 to 111 of Bld.SSR 1.00 Cum 1521.00 1 Cum
Add Labour component @ 1.00 Cum 1521.00 1 Cum
Sub - Total
Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per One Cum Rs
12 BLD-CSTN-3-13- ( 30 ) - B- Nominal mix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate)
corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate)
from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all
operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work, but including centering and shuttering
charges for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS - WOODEN SCAFFOLDING
A. MATERIALS:
Coarse aggregate 20mm graded (C-Mat-S.No:48) 0.90 cum 1172.83 1 cum
Sand - (C-Mat-S.No:2) 0.45 cum 1303.00 1 cum
Cement-(C.Memo.No.146/Cement&Steel 400.00 Kgs 4.60 1 Kgs
Sub Total of - A
B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11) 0.167 day 564.00 1 day
2nd Class Mason ( labour-Irri-Semi skilled-S.N.35) 0.167 day 540.00 1 day
Mazdoor (Both Men & Women) (Labour -Irrigation- 4.700 day 510.00 1 day
Unskilled-S.No.3)
Sub Total of - B
C. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity 1.00 hour 397.50 1 hour
(Hire Charges-Irrigation S.No16)
Add labour allowance on crew charges 1 hour 0.00 1 hour
13 BLD-CSTN-3-13- ( 30 ) - C - Nominal mix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate)
corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate)
from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all
operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work, but including centering and shuttering
charges for RCC SLABS, BEAMS -WOODEN SCAFFOLDING
RCC M20 for Sun shades of 0.60M width, 75mm th. at fixed end and 50mm th. at free end - up to 3.66m above GL
e
M-20 Nominal mix 0.0625 Cum 5144.97 1 Cum
Centering charges ,Pg No.108 to 111 of Bld.SSR 1.00 Sqm 156.00 1 Sqm
Labour charges Pg No.108 to 111 of Bld.SSR 1.00 Sqm 192.00 1 Sqm
Add Labour component @ 20%
Rs
Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per One Sqm Rs
a Footings
RCC-M-25- Design Mix 1.00 Cum 6974.12 1 Cum
Centering charges ,Pg No.108 to 111 of Bld.SSR 1.00 Cum 288.00 1 Cum
Labour charges Pg No.108 to 111 of Bld.SSR 1.00 Cum 631.00 1 Cum
Add Labour component on Labour charges @ 1.00 Cum 631.00 1 Cum
Sub - Total
Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per One Cum Rs
b Pedastals
RCC-M-25- Design Mix 1.00 Cum 6974.12 1 Cum
Centering charges ,Pg No.108 to 111 of Bld.SSR 1.00 Cum 328.00 1 Cum
Labour charges Pg No.108 to 111 of Bld.SSR 1.00 Cum 1004.00 1 Cum
Add Labour component @ 1.00 Cum 1004.00 1 Cum
Sub - Total
Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Add Labour Cess @ 0%
Page 402 of 2191 data-Bld-18-19
Rate per One Cum Rs
c Plinth beams
RCC-M-25- Design Mix 1.00 Cum 6974.12 1 Cum
Centering charges ,Pg No.108 to 111 of Bld.SSR 1.00 Cum 1390.00 1 Cum
Labour charges Pg No.108 to 111 of Bld.SSR 1.00 Cum 1521.00 1 Cum
Add Labour component @ 1.00 Cum 1521.00 1 Cum
Sub - Total
Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per One Cum Rs
14 BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using
WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved
quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site , sales & other taxes on all materials including all operational, incidental and labour charges such as
weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but
excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with
minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS.
Note : 1) The cement content is adopted as 350Kg/cum for estimating purpose only.The exact quantities will be as
per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in
cost shall be deducted.
15 BLD-CSTN-3-16-(31)-C : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH
BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved
quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering,
shuttering charges etc.,complete but excluding cost of steel and its fabrication charges (APSS No. 402) with
minimum cement content as per IS code for finished item of work. for RCC SLABS, BEAMS ( using Steel
Scaffolding ) Note : 1) The cement content is adopted as 350Kg/cum for estimating purpose only.The exact
quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/
Cum the defference in cost shall be deducted.
A RCC Dome
i RCC Dome up to 3.66 Mts height
RCC-M-25- Design Mix 1.00 Cum 5254.37 1 Cum
Material Hire Charges for centering & Scaffolding 1.00 Cum 3833.00 1 Cum
Labour Charges for centering & Scaffolding 1.00 Cum 3496.00 1 Cum
Add Labour component @ 20%
Sub - Total Rs
Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per One Cum Rs
Page 404 of 2191 data-Bld-18-19
(BLD Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with 20mm size graded machine
- crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved
CST quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc.,
N-3- to site and sales & other taxes on all materials , centering using Steel scaffolding pipes , jack props , wallers , Foot
17) plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh
batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding
cost of steel and its fabrication charges for finished item of work (APSS No. 402)
FOUNDATIONS , PLINTH , PEDESTALS ( Below Plinth)
A.MATERIALS :
4600.00
Cement 380.00 Kgs 1000 Kgs
20mm HBG graded metal 0.80 Cum 1172.83 1 Cum
Sand 0.40 Cum 1303.00 1 Cum
B.LABOUR :
1st class Mason 0.133 Nos 470.00 1 Each
2nd class Mason 0.267 Nos 450.00 1 Each
Mazdoor (both men&women) 4.600 Nos 425.00 1 Each
Add for MA @ 20% 0.20 2137.66
C.MACHINERY :
Concrete mixture 1.333 hours 397.50 1 hour
Needle vibrator 40mm ( petrol ) 1.333 hours 205.00 1 hour
Water(including for curing) 1.20 kl 98.00 1 kl
Rate per 1 cum
a Footings
Rate for Design mix M 25 1.00 Cum 6693.38 1 Cum
Hire charges of centering and scaffolding 1.00 Cum 0.00 1 Cum
Labour charges 1.00 Cum 0.00 1 Cum
Add for MA @ 20% 0.20 0.00
B RCC SLABS
B-I RCC Slabs up to 3.66 Mts unsupported height above GL
i RCC M 25 Slabs 50 mm Thick 0.05
RCC-M-25- Design Mix 1.00 Cum 5254.37 1 Cum
Material Hire Charges for centering & Scaffolding 20.00 Sqm 236.00 1 Sqm
Labour Charges for centering & Scaffolding 20.00 Sqm 215.00 1 Sqm
Add Labour component @ 20%
Sub - Total Rs
Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per One Cum Rs
16 BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild
steel (MS) steel bars ( Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour
charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of
approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement
work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages
such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all
incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other
taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126
Unit = t
(a) Material
HYSD bars including 5 per cent for overlaps and 1.05 Ton 46000.00 1 Ton
wastage -(ENC-PH.Memo.No.146/Cement
Binding wire- SSR (Irrigation) item No 3, & Steel / 6.00 kg 50.00 1 kg
T1 / 2013-14)
Sub-Total -A
B) LABOUR for cutting, bending, shifting to site,
tying, lap splicing and placing in position
Bar bender (Labour-Irrigation-Skilled-S.N.1) 10.00 day 678.00 1 day
Mazdoor (Unskilled) 10.00 day 510.00 1 day
Sub-Total -B
Total of A+B
(d) Contractor’s profit on (a+b+c) 13.615%
Rate per t = a+b+c+d 1 MT
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per One MT Sub Total:
Rate per One Kg Rs.
Rate for other Floors 1F 2F 3F
Basic rate per 10 Sqm 60480.00 60480.00 60480.00
For Lift Charges of Labour, increase @ 10% on 1188.00 2376.00 3564.00
labour charges of respective item for each upper
floor on Ground Floor Rate - Add Area Allowances
as applicable on labour charges vide Pg.131 of
Bld.Std.data
Total 61668.00 62856.00 64044.00
Material Hire Charges for centering & Scaffolding 8396.10 8557.84 8719.59
sub total 70064.10 71413.84 72763.59
Add VAT @ 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00
Rate per 1MT 70064.10 71413.84 72763.59
Rate per 1 Kg 70.06 71.41 72.76
MASONRY
Page 412 of 2191 data-Bld-18-19
17 BLD-CSTN-5-1 (39) ; Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor
1:3 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of
Seigniorage charges on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift
charges , curing charges etc., complete for finished item of work
A. MATERIALS:
Cement (ENC-PH.Memo.No.146/Cement & Steel / 96.00 Kg 4.60 1 Kg
T1)
Bricks traditional size 23 x 11 x 7 cms 2nd class 512 Nos 5.70 1 Nos
Ground moulded size 23x11x7 Cm - (1:6)
( C-Mat-S.No.63)
Sand - (C-Mat-S.No:2) 0.20 Cum 1303.00 1 Cum
Sub Total of - A
B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11) 0.24 day. 564.00 1 day.
2nd Class Mason ( labour-Irri-Semi skilled-S.N.35) 0.56 day. 540.00 1 day.
Mazdoor (Both Men & Women) (Labour -Irrigation- 1.89 day. 510.00 1 day.
Unskilled-S.No.3)
Sub Total of - B
Total A+B Rs
c.Overheads & Contractors Profit 13.615%
Sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Grand Total
Rate per One Cum Rs
18 BLD-CSTN-5-2 (40) : Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor
1:4 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of
Seigniorage charges on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift
charges , curing charges etc., complete for finished item of work
A. MATERIALS:
Cement (ENC-PH.Memo.No.146/Cement & Steel / 72.00 Kg 4.60 1 Kg
ulded size 23x11x7 Cm - (1:4)
T1 / 2013-14)
Bricks traditional size 23 x 11 x 7 cms 2nd class 512 Nos 5.70 1 Nos
(Sand
C-Mat-S.No.63)
- (C-Mat-S.No:2) 0.20 Cum 1303.00 1 Cum
Sub Total of - A
B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11) 0.24 day. 564.00 1 day.
2nd Class Mason ( labour-Irri-Semi skilled-S.N.35) 0.56 day. 540.00 1 day.
Mazdoor (Both Men & Women) (Labour -Irrigation- 1.89 day. 510.00 1 day.
Unskilled-S.No.3)
Ground moulded size 23x
Page 413 of 2191 data-Bld-18-19
Sub Total of - B
Total A+B Rs
c.Overheads & Contractors Profit 13.615%
Sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Grand Total
Rate per One Cum Rs
18 BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor
1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of
Seigniorage charges on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift
charges , curing charges etc., complete for finished item of work
A. MATERIALS:
Cement (ENC-PH.Memo.No.146/Cement & Steel / 48.00 Kg 4.60 1 Kg
Ground moulded size 23x11x7 Cm - (1:6)
T1 / 2013-14)
Bricks traditional size 23 x 11 x 7 cms 2nd class 512 Nos 5.70 1 Nos
(Sand
C-Mat-S.No.63)
- (C-Mat-S.No:2) 0.20 Cum 1303.00 1 Cum
Sub Total of - A
B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11) 0.24 day. 564.00 1 day.
2nd Class Mason ( labour-Irri-Semi skilled-S.N.35) 0.56 day. 540.00 1 day.
Mazdoor (Both Men & Women) (Labour -Irrigation- 1.89 day. 510.00 1 day.
Unskilled-S.No.3)
Total A+B Rs
c.Overheads & Contractors Profit 13.615%
Sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Grand Total
Rate per One Cum Rs
19 BLD-CSTN-5-17-(55): Brick Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 225 x
140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and
stone dust including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing
etc., cpomplete with a compresive strength not lessthan 50 kg/sqm for walls for Superstructure Walls.
A. MATERIALS:
Flyash Blocks size 29 x 22.5 x 14 cms (C-Mat- 99 Nos 23.00 1 Nos
S.N.66)
Cost of Cement Mortar ( 1:6 ) -Mortars-(g) 0.10 Cum 2773.65 1 Cum
Flyash blocks - 290 x 225 x 140 mm - (1:6)
B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11) 0.42 day. 564.00 1 day.
2nd Class Mason ( labour-R&B-Semi skilled- 0.92 day. 540.00 1 day.
S.N.44)
Mazdoor (Both Men & Women) (Labour -Irrigation- 2.80 day. 510.00 1 day.
Unskilled-S.No.3)
Total A+B Rs
c.Overheads & Contractors Profit 13.615%
Sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Grand Total
Rate per One Cum Rs
20 BLD-CSTN-5-17-(55): Brick Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 200 x
140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and
stone dust including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing
etc., cpomplete with a compresive strength not lessthan 50 kg/sqm for walls for Superstructure Walls.
A. MATERIALS:
m - (1:6)
Page 415 of 2191 data-Bld-18-19
Flyash Blocks size 29 x 20 x 14 cms (C-Mat, 111 Nos 20.00 1 Nos
B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11) 0.42 day. 564.00 1 day.
2nd Class Mason ( labour-R&B-Semi skilled- 0.92 day. 540.00 1 day.
S.N.44)
Mazdoor (Both Men & Women) (Labour -Irrigation- 2.80 day. 510.00 1 day.
Unskilled-S.No.3)
Total A+B Rs
c.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Grand Total
Rate per One Cum Rs
21 BLD-CSTN-5-17-(55): Brick Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 150 x
140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and
stone dust including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing
etc., cpomplete with a compresive strength not lessthan 50 kg/sqm for walls for Superstructure Walls.
A. MATERIALS:
Flyash blocks - 290 x 150 x 140 mm - (1:6)
B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11) 0.42 day. 564.00 1 day.
2nd Class Mason ( labour-R&B-Semi skilled- 0.92 day. 540.00 1 day.
S.N.44)
Mazdoor (Both Men & Women) (Labour -Irrigation- 2.80 day. 510.00 1 day.
Unskilled-S.No.3)
Total A+B Rs
c.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Grand Total
Flyash bl
Page 416 of 2191 data-Bld-18-19
Rate per One Cum Rs
S.No.69)
Cost of Cement Mortar ( 1:6 ) ( Mortars-g) 0.10 Cum 2773.65 1 Cum
B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11) 0.42 day. 564.00 1 day.
2nd Class Mason ( labour-R&B-Semi skilled- 0.92 day. 540.00 1 day.
S.N.44)
Mazdoor (Both Men & Women) (Labour -Irrigation- 2.80 day. 510.00 1 day.
Unskilled-S.No.3)
Total A+B Rs
c.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Grand Total
Rate per One Cum Rs
19 BLD-CSTN-5-11 (49) : 11.5 cm wide Brick masonry for super-structure on ground floor in cm (1:3) using second class
traditional size bricks including cost of all materials, seigniorage charges, labour and all operations for constructing
half brick masonry, mixing cement mortar, curing etc., complete for finished item of work, but excluding conveyance
charges of materials.
A. MATERIALS:
Bricks traditional size 23 x 11 x 7 cms 2nd class 565 Nos 5.70 1 Nos
Cement 106.00 Kg 4.60 1 Kg
11.5 cm wide Brick masonry - (1:3)
B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11) 0.60 day. 564.00 1 day.
2nd Class Mason ( labour-R&B-Semi skilled- 0.60 day. 540.00 1 day.
S.N.44)
Mazdoor (Both Men & Women) (Labour -Irrigation- 2.75 day. 510.00 1 day.
Unskilled-S.No.3)
(BLD Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with 20mm size graded machine
- crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved
CST quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc.,
N-3- to site and sales & other taxes on all materials , centering using Steel scaffolding pipes , jack props , wallers , Foot
17) plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh
batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding
cost of steel and its fabrication charges for finished item of work (APSS No. 402)
FOUNDATIONS , PLINTH , PEDESTALS ( Below Plinth)
A.MATERIALS :
a Footings
Rate for Design mix M 25 1.00 Cum 6693.38 1 Cum
Hire charges of centering and scaffolding 1.00 Cum 0.00 1 Cum
Labour charges 1.00 Cum 0.00 1 Cum
Add for MA @ 20% 0.20 0.00
20 BLD-CSTN-6-5-(60) : Construction of CRS Masonary 1st Sort in Cement Mortor ( 1:6 ) Prop using hard granite
stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage
Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor,
Construction, Scaffolding Charges curing etc., complete for finished item of Work .
A. MATERIALS:
Cement 67.20 Kg 4.60 1 Kg
Coursed Rubble Stone 0.94 Cum 615.60 1 Cum
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum 0.16 Cum 1300.60 1 Cum
Fine aggregate (Sand) 0.28 Cum 1303.00 1 Cum
B. LABOUR:
Mason 1st class 2.50 day 564.00 1 day
Mazdoor (unskilled) 2.32 day 510.00 1 day
Total A+B Rs
C.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per One Cum Rs
Page 419 of 2191 data-Bld-18-19
20 BLD-CSTN-6-6-(61) : Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite
stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage
Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor,
Construction, Scaffolding Charges curing etc., complete for finished item of Work .
A. MATERIALS:
Cement 76.80 Kg 4.60 1 Kg
Coursed Rubble Stone 0.94 Cum 615.60 1 Cum
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum 0.16 Cum 1300.60 1 Cum
Fine aggregate (Sand) 0.32 Cum 1303.00 1 Cum
B. LABOUR:
Mason 1st class 1.50 day 564.00 1 day
Mazdoor (unskilled) 2.32 day 510.00 1 day
Total A+B Rs
C.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per One Cum Rs
21 BLD-CSTN-6-12-(67) : Construction of RR Masonary in Cement Mortor ( 1:6 ) Prop using hard granite stone
including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage
Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor
,Construction, Scaffolding Charges curing etc., complete for finished item of Work .
A. MATERIALS:
Cement 79.20 Kg 4.60 1 Kg
Coursed Rubble Stone 0.44 Cum 615.60 1 Cum
Rough Stone 0.50 Cum 350.60 1 Cum
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum 0.16 Cum 1300.60 1 Cum
Fine aggregate (Sand) 0.33 Cum 1303.00 1 Cum
B. LABOUR:
Mason 1st class 1.20 day 564.00 1 day
Mazdoor (unskilled) 2.00 day 510.00 1 day
Total A+B Rs
C.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per One Cum Rs
21 BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone
including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage
Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor
,Construction, Scaffolding Charges curing etc., complete for finished item of Work .
A. MATERIALS:
Cement 59.40 Kg 4.60 1 Kg
Coursed Rubble Stone 0.44 Cum 615.60 1 Cum
Rough Stone 0.50 Cum 350.60 1 Cum
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum 0.16 Cum 1300.60 1 Cum
Fine aggregate (Sand) 0.33 Cum 1303.00 1 Cum
B. LABOUR:
Mason 1st class 1.20 day 564.00 1 day
Page 420 of 2191 data-Bld-18-19
Mazdoor (unskilled) 2.00 day 510.00 1 day
Total A+B Rs
C.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per One Cum Rs
Page 421 of 2191 data-Bld-18-19
22 BLD-CSTN-7-3-(74) : Providing raised Cement Pointing to RR Masonary in Cement Mortor (1:3) Prop . for including
cost & conveyance of all materials to site , seignaiorage charges on all materials, labour charges on all materials,
curing etc., Complete for finished item of work
A. MATERIALS:
Cement 28.80 Kg 4.60 1 Kg
Fine aggregate (Sand) 0.06 Cum 1303.00 1 Cum
B. LABOUR:
Mason 2nd class 0.50 day 540.00 1 day
Mazdoor (unskilled) 0.74 day 510.00 1 day
Total Rs
C.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs
23 BLD-CSTN-7-3-(74) : Providing raised or Cut Cement Pointing on coursed or Ashlar stone masonry or concrete block
walling in white cement mortar 1 : 3 (1 white cement : 3 marble dust).including cost & conveyance of all materials to
site , seignaiorage charges on all materials, labour charges on all materials, curing etc., Complete for finished item of
work
A. MATERIALS:
Cement mortar ( 1:4) 0.038 Cum 3325.65 1 Cum
B. LABOUR:
Mason 2nd class 1.46 day 540.00 1 day
Mazdoor (unskilled) 2.26 day 510.00 1 day
Total Rs
C.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs
Page 422 of 2191 data-Bld-18-19
23 BLD-CSTN-8-1-(76) : Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and
conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all
operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for
finished item of work. (As per SS 903). per 10 Sqm.( only for Ceiling)
A. MATERIALS:
Cement Mortor (1:3) 0.15 Cum 3877.65 1 Cum
B. LABOUR:
Mason 1st class 0.60 day 564.00 1 day
Mazdoor (unskilled) 0.96 day 510.00 1 day
Sub-Total of Labour
Total A+B Rs
C.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs
24 BLD-CSTN-8-2-(77) : Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and
conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all
operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for
finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:4) 0.15 Cum 3325.65 1 Cum
B. LABOUR:
Mason 1st class 0.60 day 564.00 1 day
Mazdoor (unskilled) 0.96 day 510.00 1 day
Sub-Total of Labour
Total A+B
C.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Page 423 of 2191 data-Bld-18-19
Rate per 1 Sqm Rs
25 BLD-CSTN-8-4-(79): Plastering with 12mm thick in single coat in CM (1:6) finished smooth including cost and
conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all
operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for
finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:6) 0.15 Cum 2773.65 1 Cum
B. LABOUR:
Mason 1st class 0.60 day 564.00 1 day
Mazdoor (unskilled) 0.96 day 510.00 1 day
Sub-Total of Labour
Total A+B Rs
C.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs
26 BLD-CSTN-8-6-(81) : Plastering with 15mm thick in single coat in CM (1:4) finished smooth including cost and
conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all
operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for
finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:4) 0.19 Cum 3325.65 1 Cum
B. LABOUR:
Mason 1st class 0.60 day 564.00 1 day
Mazdoor (unskilled) 0.96 day 510.00 1 day
Sub-Total of Labour
Total A+B Rs
C.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs
27 BLD-CSTN-8-7-(82) : Plastering with 20mm thick in single coat in CM (1:4) finished smooth including cost and
conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all
operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for
finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:4) 0.21 Cum 3325.65 1 Cum
B. LABOUR:
Mason 1st class 0.94 day 564.00 1 day
Mazdoor (unskilled) 1.60 day 510.00 1 day
Sub-Total of Labour
Total A+B Rs
C.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Page 425 of 2191 data-Bld-18-19
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs
25 BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of
4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand ,
Water, etc., to site, seigniorage charges, all operational, including charges, labour charges for mixing mortar,
finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished
item of work of uneven surfaces of walls. (External walls)
Unit = 10 sqm
A. MATERIALS:
Base Coat in CM(1:6), 16 mm thick
Cement 43.00 Kg 4.60 1 Kg
Fine aggregate (Sand) 0.18 Cum 1303.00 1 Cum
Top Coat in CM(1:4), 4 mm thick
Cement 14.50 Kg 4.60 1 Kg
Fine aggregate (Sand) 0.04 Cum 1303.00 1 Cum
Sub-Total- for Cost of Material
B. LABOUR:
Mason 1st class 0.63 day 564.00 1 day
Mason 2nd class 1.47 day 540.00 1 day
Mazdoor (unskilled) 3.90 day 510.00 1 day
Sub-Total- for Cost of Labour
Total Rs
C.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs
26 BLD-CSTN-8-10 - (85) : Plastering 12mm thick two coats with base coat of 8mm thick in C.M. (1:5) and top coat of
4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand ,
Water, etc., to site, seigniorage charges, all operational, including charges, labour charges for mixing mortar,
finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished
item of work.
Unit = 10 sqm
A. MATERIALS:
Base Coat in CM (1:5), 8 mm thick
Cement 31.70 Kg 4.60 1 Kg
Fine aggregate (Sand) 0.11 Cum 1303.00 1 Cum
Top Coat in CM (1:4), 4 mm thick
Cement 19.20 Kg 4.60 1 Kg
Fine aggregate (Sand) 0.04 Cum 1303.00 1 Cum
Sub-Total- for Cost of Material
B. LABOUR:
Mason 1st class 0.63 day 564.00 1 day
Mason 2nd class 1.47 day 540.00 1 day
Mazdoor (unskilled) 3.90 day 510.00 1 day
Sub-Total- for Cost of Labour
Total Rs
C.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs
27 BLD-CSTN-8-11-(86) : RCM facia 5cm thick in CM (1:3) for drop walls, fins with rabbit wire mesh & nominal
reinforcement as directed by Engineer-in-charge with dubara sponge finishing, including cost & conveyance of all
materials to site, seigniorage charges, sales & other taxes on all materials, operational & incidental, cost and
conveyance of cement, wire mesh, water to work site, centering, scaffolding and form work, lift charges etc., complete
for finished items of work but excluding cost of steel & its fabrication charges, for finished item of work. (APSS No.403
& 903)
Unit - 10 sqm
A) MATERIALS
Rabbit wire mesh - TBSC-E.I-12 13.30 sqm 19.00 1 sqm
Cement Mortar 1:3 for 25 mm thick 0.25 cum 3877.65 1 cum
Dry Cement for making Lumps 50.00 kg 4.60 1 kg
12 mm plastering 2 coats in 1:4 & 1:2 cm both 21.80 sqm 1409.65 10 sqm
sides Excluding HYSD Steel/ Mild steel & Binding
wire Sub-Total- for Cost of Material
B) LABOUR CHARGES
1st Class Mason 8.00 day 564.00 1 day
Miller Operator 1.00 day 540.00 1 day
Mazdoor (unskilled) 10.00 day 510.00 1 day
Sub-Total- for Cost of Labour
c) Machinery
Machine Mixing Mortar with Miller - Hire charges 2.00 Hrs 303.10 1 Hrs
Total Rs
over heads & contractors profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs
26 BLD-CSTN-9-1-(99) : Flooring with Polished Shabad stones 1st class 15 to 18 mm thick (Tandur Stone slabs)
set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like
consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like
cement, sand, and water and flooring stones etc., complete, including seigniorage charges, labour charges for
dressing of flooring stones etc., complete for finished item of work, including the cost and conveyance of all materials.
Unit = 10 sqm
A. MATERIALS:
Polished Shahabad / Tandur stone slabs of all 11.00 sqm 164.00 1 sqm
sizes between 15 -18mm thickness - TBSC-B.I-03
Cement for CM (1:8) proportion for base coat 21.60 kg. 4.60 1 kg.
Cement for slurry 33.00 kg. 4.60 1 kg.
Cement for jointing 20.00 kg. 4.60 1 kg.
Sand for CM (1:8) proportion (C-Mat-Sn.3) 0.12 cum 1303.00 1 cum
Sub-Total- for Cost of Material
B. LABOUR:
Mason 1st class 3.10 day 564.00 1 day
Mason 2 class
nd
1.10 day 540.00 1 day
Mazdoor (unskilled) 0.86 day 510.00 1 day
Sub-Total- for Cost of Labour
Sub-Total
Add water charges 1% 1.00%
Grand Total Rs
over heads & contractors profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs
Page 429 of 2191 data-Bld-18-19
Rate for other Floors 1F 2F 3F
Basic rate per 10 Sqm 5135.37 5135.37 5135.37
For Lift Charges of Labour, increase @ 10% on
labour
Total charges of respective item for each upper 5135.37 5135.37 5135.37
floor on Ground Floor Rate - Add Area Allowances
Overheads & Contractors
as applicable Profit @ 0.13615
on labour charges vide Pg.131 of 699.18 699.18 699.18
sub total
Bld.Std.data 5834.55 5834.55 5834.55
Add VAT @ 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00
Rate per 10 Sqm 5834.55 5834.55 5834.55
Rate per 1 Sqm 583.46 583.46 583.46
27 BLD-CSTN-9-1-(99) - A : Flooring with Polished Bethamcherla coloured stone minimum 25 mm thick (0.254M
x 0.254M) set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of
honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all
materials like cement, sand, and water and flooring stones etc., complete, including seigniorage charges, labour
charges for dressing of flooring stones etc., complete for finished item of work, including the cost and conveyance of
all materials.
Unit = 10 sqm
A. MATERIALS:
Polished Bethamcherla coloured stone 22 to 25 11.00 sqm 273.00 1 sqm
mm thick of all sizes - TBSC-B.I-09
Cement for CM (1:8) proportion for base coat 21.60 kg. 4.60 1 kg.
Cement for slurry 33.00 kg. 4.60 1 kg.
Cement for jointing 20.00 kg. 4.60 1 kg.
Sand for CM (1:8) proportion (C-Mat-Sn.3) 0.12 cum 1303.00 1 cum
Sub-Total- for Cost of Material
B. LABOUR:
Mason 1st class 3.10 day 564.00 1 day
Mason 2 class
nd
1.10 day 540.00 1 day
Mazdoor (unskilled) 0.86 day 510.00 1 day
Sub-Total- for Cost of Labour
Sub-Total
Add water charges 1% 1.00%
Grand Total Rs
over heads & contractors profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs
28 BLD-CSTN-9-2-(100) : Flooring with 50 mm thick Rough Cuddapah/ Shahbad stones, set over base coat of
cement mortar (1 : 8) 12 mm thick over CC bed already laid or RCC roof slab, including pointing with cement mortar
1:3 duly filling joints nearly, including cost of all materials like flooring stone, cement, sand, and water etc., complete,
including seigniorage charges, labour charges for dressing of flooring stones etc., complete for finished item of
work,including the cost and conveyance of all materials.
A. MATERIALS:
Kadapa slabs of 50 mm thick of all sizes -TBSC- 10.50 Sqm 110.00 1 Sqm
B.I-05
Cement for CM (1:8) proportion for base coat 21.60 Kg 4.60 1 Kg
Cement for CM 1:3 proportion for pointing 9.60 Kg 4.60 1 Kg
Sand for CM (1:8) proportion 0.12 Cum 1493.00 1 Cum
Sand for CM (1:3) proportion 0.02 Cum 1493.00 1 Cum
Sub-Total- for Cost of Material
B. LABOUR:
Mason 1st class 0.960 day 564.00 1 day
Mason 2nd class 2.240 day 540.00 1 day
Mazdoor (unskilled) 3.30 day 510.00 1 day
Sub-Total- for Cost of Labour
Total Rs
over heads & contractors profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs
29 BLD-CSTN-9-4-(102) : Flooring with precast terrazzo chequered tiles conforming to IS: 13801 Supplying
precast terrazzo chequered tiles conforming to IS:13801 using marble aggregates of size 10mm, sand, marble
powder, white cement pigments etc., with terrazzo topping not less than 6 mm of tiles overall size not less than
20 mm thick any coloured shades. set over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid
or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed with
neat cement to full depth mixed with pigment of matching shade including cost of all materials like cement, sand
water and tiles etc., complete, including seigniorage charges, complete for finished item of work, including the cost
and conveyance of all materials.
Unit = 10 sqm
A. MATERIALS:
Chequerred terrazzo tiles of 20 mm thick --TBSC- 10.50 sqm 285.00 1 sqm
C.VII-03
Cement for CM (1:6) proportion for base coat 28.80 kg. 4.60 1 kg.
Cement for slurry 33.00 kg. 4.60 1 kg.
Cement for jointing & pointing 6.00 kg. 4.60 1 kg.
Pigment 0.00 kg. 1 kg.
Sand for CM (1:6) proportion 0.12 cum 1493.00 1 cum
Sub-Total- for Cost of Material
B. MACHINERY
Nill
C. LABOUR
Mason 2nd class 0.960 day 540.00 1 day
Man mazdoor 2.240 day 510.00 1 day
Mazdoor (unskiled) 3.30 day 510.00 1 day
Sub-Total- for Cost of Labour
Page 431 of 2191 data-Bld-18-19
Add water charges 1% 1.00%
Total Rs
over heads & contractors profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs
30 BLD-CSTN-9-5-(103) :Flooring with Ordinary Soluble salt porcelain vitrified tiles screen printed and
polished of size 400 x 400 mm and thickness between 8-9 mm 1st quality conforming to IS:13711,
IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base
coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of
honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with
pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including
seigniorage charges, etc., complete for finished item of work, including the cost and conveyance of all materials.
Unit = 10 sqm
A. MATERIALS:
Vitrified tiles of 1st quality of size- medium shade 10.50 sqm 0.00 1 sqm
-400 x 400 x 8 to 9mm -TBSC-C.II-01
Cement for CM (1:8) for base coat 21.60 kg. 4.60 1 kg.
Cement for slurry 33.00 kg. 4.60 1 kg.
Cement for Pointing with CM (1:3) 6.000 kg. 4.60 1 kg.
Sand for CM (1:8) 0.12 cum 1493.00 1 cum
Sand for pointing 0.020 cum 1493.00 1 cum
Sub-Total- for Cost of Material
B. LABOUR
Mason 1st class 0.96 day 564.00 1 day
Mason 2nd class 2.24 day 540.00 1 day
Mazdoor (unskiled) 3.30 day 510.00 1 day
Sub-Total- for Cost of Labour
27 BLD-CSTN-9-5-(103) : Flooring with Nano polished /stain free soluble salt porcelain vitrified tiles screen
printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711,
IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of
cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey
like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment
of matching shade, including cost of all materials like cement, sand water and tiles etc. including seigniorage charges,
etc., complete for finished item of work, including the cost and conveyance of all materials.
Unit = 10 sqm
A. MATERIALS:
Nano polished Vitrified tiles of size--600 x 600 mm 10.50 sqm 421.00 1 sqm
x 8-10 mm thickness - TBSC-C.II-03
Cement for CM (1:8) for base coat 21.60 kg. 4.60 1 kg.
Cement for slurry 33.00 kg. 4.60 1 kg.
Cement for Pointing with CM (1:3) 6.000 kg. 4.60 1 kg.
Sand for CM (1:8) 0.12 cum 1493.00 1 cum
Sand for pointing 0.020 cum 1493.00 1 cum
Sub-Total- for Cost of Material
B. LABOUR
Mason 1st class 0.96 day 564.00 1 day
Mason 2nd class 2.24 day 540.00 1 day
Mazdoor (unskiled) 3.30 day 510.00 1 day
Sub-Total- for Cost of Labour
28 BLD-CSTN-9-5-(103) : Flooring with Double charged / multi charged stain free full body porcelain vitrified
tiles with double layer pigment of size 800 x 800 mm and thickness between 9-11 mm 1st quality
conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and
designs, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab,
including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement
paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and
tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, including the cost and
conveyance of all materials.
Unit = 10 sqm
A. MATERIALS:
Double charged Vitrified polished floor tiles of size 10.50 sqm 600.00 1 sqm
800 x 800 x 9-11 mm thickness - TBSC-C.II-06
Cement for CM (1:8) for base coat 21.60 kg. 4.60 1 kg.
Cement for slurry 33.00 kg. 4.60 1 kg.
Cement for Pointing with CM (1:3) 6.000 kg. 4.60 1 kg.
Sand for CM (1:8) 0.12 cum 1493.00 1 cum
Sand for pointing 0.020 cum 1493.00 1 cum
Sub-Total- for Cost of Material
B. LABOUR
Mason 1st class 0.96 day 564.00 1 day
Mason 2nd class 2.24 day 540.00 1 day
Mazdoor (unskiled) 3.30 day 510.00 1 day
Sub-Total- for Cost of Labour
28 BLD-CSTN-9-6-(104) : Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300
mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630
(Parts 1 to 15) of any colour and finish in all shades and design, set over base coat of cement mortar (1:8),
12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency
spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching
shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges,
etc., complete for finished item of work,including the cost and conveyance of all materials.
Unit = 10 sqm
A. MATERIALS:
Ceramic floor tiles - 7-8mm thick - TBSC-C.I-01 10.50 sqm 300.00 1 sqm
Cement for CM (1:8) for base coat 21.60 kg. 4.60 1 kg.
Cement for slurry 33.00 kg. 4.60 1 kg.
White cement - TBSC-R.I-01 2.00 kg. 29.00 1 kg.
Sand for CM (1:8) 0.12 cum 1303.00 1 cum
Sub-Total- for Cost of Material
B. LABOUR
Mason 1st class 0.96 Nos 564.00 1 Nos
Mason 2 class
nd
2.24 Nos 540.00 1 Nos
Mazdoor (unskiled) 3.30 Nos 510.00 1 Nos
Sub-Total- for Cost of Labour
Sub total of Material and Labour
Add water charges 1% 1.00%
Grand Total Rs
over heads & contractors profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs
Unit = 10 sqm
A. MATERIALS:
Ceramic floor tiles - 600 x 600 mm and thickness 10.50 sqm 485.00 1 sqm
between 8-10 mm - TBSC-C.I-04
Cement for CM (1:8) for base coat 21.60 kg. 4.60 1 kg.
Cement for slurry 33.00 kg. 4.60 1 kg.
White cement - TBSC-R.I-01 2.00 kg. 29.00 1 kg.
Sand for CM (1:8) 0.12 cum 1303.00 1 cum
Sub-Total- for Cost of Material
B. LABOUR
Mason 1st class 0.96 Nos 564.00 1 Nos
Mason 2 class
nd
2.24 Nos 540.00 1 Nos
Mazdoor (unskiled) 3.30 Nos 510.00 1 Nos
Sub-Total- for Cost of Labour
Sub total of Material and Labour
Add water charges 1% 1.00%
Grand Total Rs
over heads & contractors profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs
29 BLD-CSTN-9-7-(105) :Flooring with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than
black / premium colours slabs set over base coat of cement mortar (1:8), 20 mm thick over CC bed already laid or
RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with
white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement,
sand water and tilesetc., complete, including seigniorage charges, labour charges for dressing of tilesetc., complete
for finished item of work,including the cost and conveyance of all materials.
Unit = 10 sqm
A. MATERIALS:
Page 436 of 2191 data-Bld-18-19
High polished granite 16 to 18 mm thick slab other 10.50 sqm 3118.00 1 sqm
than black - TBSC-B.III-01
Cement for CM (1:8) for base coat 36.00 kg. 4.60 1 kg.
Cement for slurry 33.00 kg. 4.60 1 kg.
White cement for jointing & pointing 6.00 kg. 29.00 1 kg.
Cement for jointing kg.
Sand for CM (1:8) 0.20 cum 1303.00 1 cum
Sub-Total- for Cost of Material
B. LABOUR
Mason 1st class 3.00 day 564.00 1 day
Mason 2nd class 1.00 day 540.00 1 day
Mazdoor (unskiled) 8.00 day 510.00 1 day
Sub-Total- for Cost of Labour
Sub total of Material and Labour
Add water charges 1% 1.00%
Grand Total
over heads & contractors profit 13.615%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total cost for 10 sqm
Rate per 10 Sqm
Rate per 1 Sqm Rs
Amount
asphalt concrete upto 75 mm thick ) including water bound macadam and
e trench work. as directed by the departmental officers.
1042.00
0.00
141.87
1183.87
0.00
1183.87
tacking of excavated materials for pipe line trench work. as directed by the
2169.00
0.00
295.31
2464.31
0.00
2464.31
including soiling and stacking of excavated materials for pipe line trench
ers.
267.00
0.00
36.35
303.35
0.00
303.35
0.00
1856.40
0.00
1856.40
0.00
1856.40
252.75
2109.15
210.92
0.00
0.00
210.92
Page 438 of 2191 data-Bld-18-19
s 2.36mm and below in trenches, sides of foundations and basement with
hick, consolidating each deposited layer by watering and ramming including
and all operational, incidental, labour charges, hire charges of T & P etc.,
NO. 309 & 310)
4649.70
0.00
158.10
4807.80
654.58
5462.38
0.00
0.00
5462.38
910.40
910.40
889.56
0.00
158.10
1047.66
142.64
1190.30
0.00
0.00
1190.30
198.38
198.38
xture all works up to Plinth Level: Plain Cement concrete nominal mix
arse aggregate ) using 20mm size Hard Granite Machine Crushed Metal
erials like cement, sand, coarse aggregate water etc., to site , seigniorage
s , for mixing , laying, concrete , ramming in 15 cm layers, finishing top
mplete for finished item of work.for foundation and under flooring bed.
745.20
1130.58
586.35
117.60
Page 439 of 2191 data-Bld-18-19
397.50
56.40
708.90
3742.53
509.55
4252.08
0.00
0.00
4252.08
4252.08
1518.00
1055.54
586.35
117.60
397.50
56.40
708.90
4440.29
604.55
5044.84
0.00
0.00
5044.84
5044.84
4440.29
177.61
4617.90
630.34
5248.25
4440.29
444.03
4884.32
666.71
Page 440 of 2191 data-Bld-18-19
5551.03
ixture up to Plinth Level : Plain Cement concrete (M 15) Nominal Mix
aggregate ) using 40, 20 & 10mm size Hard Granite Machine Crushed
all materials like cement, sand, coarse aggregate water etc., to site ,
abour charges , for mixing , laying, concrete , ramming in 15 cm layers,
uring etc., complete for finished item of work.
1265.00
431.97
339.17
89.10
625.44
117.60
397.50
0.00
56.40
708.90
4031.08
548.83
4579.91
0.00
0.00
4579.91
4579.91
1265.00
316.66
625.44
117.60
397.50
0.00
56.40
708.90
3487.50
474.82
3962.32
Page 441 of 2191 data-Bld-18-19
0.00
0.00
3962.32
3962.32
S (Below Plinth)
1055.54
586.35
1518.00
75.01
144.18
1836.00
397.50
205.00
117.60
5935.18
5935.18
288.00
631.00
126.20
6980.38
950.38
7930.76
0.00
0.00
7930.76
5935.18
Page 442 of 2191 data-Bld-18-19
328.00
1004.00
200.80
7467.98
1016.77
8484.75
0.00
0.00
8484.75
5935.18
1390.00
1521.00
304.20
9150.38
1245.82
10396.20
0.00
0.00
10396.20
CC WALLS IN BUILDINGS
1055.54
586.35
1840.00
3481.89
94.19
90.18
2397.00
2581.37
397.50
0.00
205.00
0.00
117.60
720.10
Page 443 of 2191 data-Bld-18-19
6783.36
923.55
7706.91
0.00
0
7706.91
7706.91
6783.36
238.00
1757.00
8778.36
1195.17
9973.53
0.00
0.00
9973.53
6783.36
790.00
1251.00
8824.36
1201.44
10025.80
0.00
0.00
10025.80
Page 444 of 2191 data-Bld-18-19
AFFOLDING
1055.54
586.35
1840.00
3481.89
37.79
71.82
1275.00
1384.61
106.13
54.74
117.60
278.47
5144.97
700.49
5845.46
0
0
5845.46
5845.50
Page 445 of 2191 data-Bld-18-19
m
5144.97
1580.00
1670.00
334.00
8728.97
1188.45
9917.42
0
0
9917.42
9917.45
m
5144.97
1264.00
1336.00
267.20
8012.17
1090.86
9103.03
0
0
9103.03
9103.05
Page 446 of 2191 data-Bld-18-19
m
5144.97
1053.86
1113.89
222.78
7535.50
1025.96
8561.46
0
0
8561.46
8561.50
5144.97
1395.00
1473.00
294.60
Page 447 of 2191 data-Bld-18-19
8307.57
1131.08
9438.65
0
0
9438.65
9438.65
75mm th. at fixed end and 50mm th. at free end - up to 3.66m above GL
321.56
156.00
192.00
38.40
707.96
96.39
804.35
0
0
804.35
804.35
Page 448 of 2191 data-Bld-18-19
Page 449 of 2191 data-Bld-18-19
S (Below Plinth)
938.26
521.20
1748.00
75.01
144.18
2346.00
810.60
273.27
117.60
6974.12
6974.12
0.00
0.00
6974.12
949.53
7923.65
0.00
0.00
7923.65
6974.12
328.00
1004.00
200.80
8506.92
1158.22
9665.14
0.00
0.00
Page 450 of 2191 data-Bld-18-19
9665.14
6974.12
1390.00
1521.00
304.20
10189.32
1387.28
11576.60
0.00
0.00
11576.60
938.26
521.20
1748.00
3207.46
94.19
90.18
2856.00
3040.37
810.60
273.27
117.60
1201.47
7449.30
7449.30
2657.50
10106.80
1376.04
11482.84
0.00
0.00
Page 451 of 2191 data-Bld-18-19
11482.84
938.26
521.20
1748.00
3207.46
37.79
71.82
1569.27
1678.88
187.29
63.14
117.60
368.03
5254.37
715.38
5969.75
0
0
5969.75
5969.75
5254.37
3833.00
3496.00
699.20
13282.57
1808.42
15090.99
0.00
0.00
15090.99
Page 452 of 2191 data-Bld-18-19
crete M 25 grade corresponding to IS 456 with 20mm size graded machine
gate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved
l materials like cement, fine aggregate (sand) coarse aggregate, water etc.,
erials , centering using Steel scaffolding pipes , jack props , wallers , Foot
tc., including all operational, incidental and labour charges such as weigh
e, curing etc., and overheads & contractors profit complete but excluding
finished item of work (APSS No. 402)
1748.00
938.26
521.20
62.51
120.15
1955.00
427.53
529.87
273.27
117.60
6693.38
6693.38
0.00
0.00
0.00
6693.38
911.30
7604.69
7604.69
m
5254.37
4720.00
4300.00
14274.37
1943.46
16217.83
0.00
0.00
16217.83
m
5254.37
3145.88
Page 453 of 2191 data-Bld-18-19
2865.95
11266.20
1533.89
12800.09
0.00
0.00
12800.09
m
5254.37
2360.00
2150.00
9764.37
1329.42
11093.79
0.00
0.00
11093.79
Page 454 of 2191 data-Bld-18-19
m
5254.37
1888.00
1720.00
344.00
9206.37
1253.45
10459.82
0.00
0.00
10459.82
m
5254.37
0.00
0.00
5254.37
715.38
5969.75
0.00
0.00
5969.75
Page 455 of 2191 data-Bld-18-19
m
5254.37
635.00
580.00
116.00
6585.37
896.6
7481.97
0.00
0.00
7481.97
7481.97
26.92
24.59
7533.49
0.00
7533.49
m
5254.37
1387.53
1267.62
7909.52
1076.88
8986.40
0.00
Page 456 of 2191 data-Bld-18-19
0.00
8986.40
m
5254.37
1215.00
1110.00
222.00
7801.37
1062.16
8863.53
0.00
0.00
8863.53
8863.53
Page 457 of 2191 data-Bld-18-19
m
5254.37
972.00
888.00
177.60
7291.97
992.80
8284.77
0.00
0.00
8284.77
m
5254.37
782.32
714.56
142.91
6894.16
938.64
7832.80
0.00
0.00
7832.80
5254.37
2085.00
1903.00
9242.37
1258.35
10500.72
Page 458 of 2191 data-Bld-18-19
0.00
0.00
10500.72
10500.72
221.01
201.72
10923.45
0.00
10923.45
328.40
233.00
248.00
809.40
110.2
919.60
0.00
0.00
919.60
919.60
Page 459 of 2191 data-Bld-18-19
48300.00
300.00
48600.00
6780.00
5100.00
11880.00
60480.00
8234.35
68714.35
0.00
0.00
68714.00
68.71
MASONRY
Page 460 of 2191 data-Bld-18-19
Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor
of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of
uding all labour charges like mixing Cement Mortor, scaffoding charges lift
finished item of work
441.60
2918.40
260.60
3620.60
135.36
302.40
963.90
1401.66
5022.26
683.78
5706.04
0.00
0.00
5706.04
5706.04
331.20
2918.40
260.60
3510.20
135.36
302.40
963.90
Page 461 of 2191 data-Bld-18-19
1401.66
4911.86
668.75
5580.61
0.00
0.00
5580.61
5580.61
220.80
2918.40
260.60
3399.80
135.36
302.40
963.90
1401.66
4801.46
653.72
5455.18
0.00
0.00
5455.18
5455.18
Page 462 of 2191 data-Bld-18-19
in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 225 x
blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and
of all materials, labour charges, seiniorage charges, scaffolding and curing
not lessthan 50 kg/sqm for walls for Superstructure Walls.
2277.00
277.37
2554.37
236.88
496.80
1428.00
2161.68
4716.05
642.09
5358.14
0.00
0.00
5358.14
5358.14
in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 200 x
blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and
of all materials, labour charges, seiniorage charges, scaffolding and curing
not lessthan 50 kg/sqm for walls for Superstructure Walls.
Page 463 of 2191 data-Bld-18-19
2220.00
277.37
2497.37
236.88
496.80
1428.00
2161.68
4659.05
634.33
5293.38
0
0
5293.38
5293.40
in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 150 x
blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and
of all materials, labour charges, seiniorage charges, scaffolding and curing
not lessthan 50 kg/sqm for walls for Superstructure Walls.
2072.00
277.37
2349.37
236.88
496.80
1428.00
2161.68
4511.05
614.18
5125.23
0.00
0.00
5125.23
Page 464 of 2191 data-Bld-18-19
5125.23
in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 112/100
d blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and
of all materials, labour charges, seiniorage charges, scaffolding and curing
not lessthan 50 kg/sqm for walls for Superstructure Walls.
1584.00
277.37
1861.37
236.88
496.80
1428.00
2161.68
4023.05
547.74
4570.79
0.00
0.00
4570.79
4570.79
Page 465 of 2191 data-Bld-18-19
3220.50
487.60
286.66
3994.76
338.40
324.00
1402.50
2064.90
6059.66
68.34
6128.00
834.33
6962.33
0.00
0.00
6962.33
1748.00
Page 466 of 2191 data-Bld-18-19
938.26
521.20
62.51
120.15
1955.00
427.53
529.87
273.27
117.60
6693.38
6693.38
0.00
0.00
0.00
6693.38
911.30
7604.69
7604.69
RS Masonary 1st Sort in Cement Mortor ( 1:6 ) Prop using hard granite
materials like Cement, Sand , Water, Granite Stones, including Seigniorage
for cutting Stones to required size and shape, mixing of Cement Mortor,
tc., complete for finished item of Work .
309.12
578.66
208.10
364.84
1410.00
1183.20
4053.92
551.94
4605.86
0.00
0.00
4605.86
Page 467 of 2191 data-Bld-18-19
S Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite
materials like Cement, Sand , Water, Granite Stones, including Seigniorage
for cutting Stones to required size and shape, mixing of Cement Mortor,
tc., complete for finished item of Work .
353.28
578.66
208.10
416.96
846.00
1183.20
3586.20
488.26
4074.46
0.00
0.00
4074.46
364.32
270.86
175.30
208.10
429.99
676.80
1020.00
3145.37
428.24
3573.61
0.00
0.00
3573.61
273.24
270.86
175.30
208.10
429.99
676.80
Page 468 of 2191 data-Bld-18-19
1020.00
3054.29
415.84
3470.13
0.00
0.00
3470.13
Page 469 of 2191 data-Bld-18-19
66.24
44.79
270.00
377.40
758.43
103.26
861.69
0.00
0.00
861.69
86.17
132.48
78.18
270.00
377.40
858.06
116.82
974.88
0.00
0.00
974.88
97.49
126.37
788.40
1152.60
2067.37
281.47
2348.84
0.00
0.00
2348.84
234.88
Page 470 of 2191 data-Bld-18-19
581.65
338.40
489.60
828.00
1409.65
191.92
1601.57
0.00
0.00
1601.57
160.16
498.85
338.40
489.60
828.00
1326.85
180.65
1507.50
0.00
0.00
1507.50
Page 471 of 2191 data-Bld-18-19
150.75
416.05
338.40
489.60
828.00
1244.05
169.38
1413.43
0.00
0.00
1413.43
141.34
Page 472 of 2191 data-Bld-18-19
631.87
338.40
489.60
828.00
1459.87
198.76
1658.63
0.00
0.00
1658.63
165.86
698.39
530.16
816.00
1346.16
2044.55
278.37
2322.92
0.00
0.00
Page 473 of 2191 data-Bld-18-19
2322.92
232.29
ck two coats with base coat of 16mm thick in C.M. (1:6) and top coat of
e finishing including cost & conveyance of all materials like cement, Sand ,
s, all operational, including charges, labour charges for mixing mortar,
including cutting grooves where ever necessary etc., complete for finished
External walls)
197.80
234.54
66.70
52.12
551.16
355.32
793.80
1989.00
3138.12
3689.28
502.3
4191.58
0.00
0.00
4191.58
419.16
Page 474 of 2191 data-Bld-18-19
thick two coats with base coat of 8mm thick in C.M. (1:5) and top coat of
e finishing including cost & conveyance of all materials like cement, Sand ,
s, all operational, including charges, labour charges for mixing mortar,
including cutting grooves where ever necessary etc., complete for finished
145.82
143.33
88.32
52.12
429.59
355.32
793.80
1989.00
3138.12
3567.71
485.74
4053.45
0.00
0.00
4053.45
405.35
Page 475 of 2191 data-Bld-18-19
hick in CM (1:3) for drop walls, fins with rabbit wire mesh & nominal
charge with dubara sponge finishing, including cost & conveyance of all
ales & other taxes on all materials, operational & incidental, cost and
o work site, centering, scaffolding and form work, lift charges etc., complete
st of steel & its fabrication charges, for finished item of work. (APSS No.403
252.70
969.41
230.00
3073.04
4525.15
4512.00
540.00
5100.00
10152.00
606.20
15283.35
2080.83
17364.18
0.00
0.00
17364.18
1736.42
1045.00
99.36
151.80
92.00
156.36
1544.52
1748.40
594.00
438.60
2781.00
4325.52
43.26
4368.78
594.81
4963.59
0.00
0.00
4963.59
496.36
1804.00
99.36
151.80
92.00
156.36
2303.52
1748.40
594.00
438.60
2781.00
5084.52
50.85
5135.37
699.18
5834.55
0.00
0.00
5834.55
583.46
Page 477 of 2191 data-Bld-18-19
3003.00
99.36
151.80
92.00
156.36
3502.52
1748.40
594.00
438.60
2781.00
6283.52
62.84
6346.36
864.06
7210.42
0.00
0.00
7210.42
721.04
Page 478 of 2191 data-Bld-18-19
1155.00
99.36
44.16
179.16
29.86
1507.54
541.44
1209.60
1683.00
3434.04
4941.58
672.8
5614.38
0.00
0.00
5614.38
561.44
2992.50
132.48
151.80
27.60
0.00
179.16
3483.54
518.40
1142.40
1683.00
3343.80
6827.34
Page 479 of 2191 data-Bld-18-19
68.27
6895.61
938.84
7834.45
0.00
0.00
7834.45
783.45
0.00
99.36
151.80
27.60
179.16
29.86
487.78
541.44
1209.60
1683.00
3434.04
3921.82
39.22
3961.04
539.3
4500.34
0.00
0.00
Page 480 of 2191 data-Bld-18-19
4500.34
450.03
ano polished /stain free soluble salt porcelain vitrified tiles screen
hickness between 8-10 mm 1st quality conforming to IS:13711,
ny colour and finish in all shades and designs, set over base coat of
C bed already laid or RCC roof slab, including neat cement slurry of honey
m & jointed neatly with white cement paste to full depth mixed with pigment
terials like cement, sand water and tiles etc. including seigniorage charges,
luding the cost and conveyance of all materials.
4420.50
99.36
151.80
27.60
179.16
29.86
4908.28
541.44
1209.60
1683.00
3434.04
8342.32
83.42
8425.74
1147.16
9572.90
0.00
0.00
9572.90
957.29
Page 481 of 2191 data-Bld-18-19
uble charged / multi charged stain free full body porcelain vitrified
ze 800 x 800 mm and thickness between 9-11 mm 1st quality
:13630 (Parts 1 to 15) of any colour and finish in all shades and
mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab,
consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement
matching shade, including cost of all materials like cement, sand water and
charges, etc., complete for finished item of work, including the cost and
6300.00
99.36
151.80
27.60
179.16
29.86
6787.78
541.44
1209.60
1683.00
3434.04
10221.82
102.22
10324.04
1405.62
11729.66
0.00
0.00
11729.66
1172.97
Page 482 of 2191 data-Bld-18-19
-skid red or white full body Ceramic floor tiles of size 300 x 300
m 1st quality conforming to IS:13711, IS:13712, IS:13630
ish in all shades and design, set over base coat of cement mortar (1:8),
r RCC roof slab, including neat cement slurry of honey like consistency
tly with white cement paste to full depth mixed with pigment of matching
ement, sand water and tiles etc., complete, including seigniorage charges,
uding the cost and conveyance of all materials.
3150.00
99.36
151.80
58.00
156.36
3615.52
541.44
1209.60
1683.00
3434.04
7049.56
70.5
7120.06
969.4
8089.46
0.00
0.00
8089.46
808.95
Page 483 of 2191 data-Bld-18-19
-skid red or white full body Ceramic floor tiles of scratch free-
inish of size 600 x 600 mm and thickness between 8-10 mm 1st
2, IS:13630 (Parts 1 to 15) of any colour and finish in all shades
ent mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab,
consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement
matching shade, including cost of all materials like cement, sand water and
charges, etc., complete for finished item of work,including the cost and
5092.50
99.36
151.80
58.00
156.36
5558.02
541.44
1209.60
1683.00
3434.04
8992.06
89.92
9081.98
1236.51
10318.49
0.00
0.00
10318.49
1031.85
165.60
151.80
174.00
260.60
33491.00
1692.00
540.00
4080.00
6312.00
39803.00
63.12
39866.12
5427.77
45293.89
0.00
0.00
45293.89
45293.89
4529.39
Page 485 of 2191 Earthing
Kodad Municipality
DATA BASED ON - 2018-2019 SSR
EARTH WORK EXCAVATION
1 BLD-CSTN-2-1 (9): Earth work excavation for foundations and depositing on bank for all lifts and with an
including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. co
item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).
Kodad Municipality
A BASED ON - 2018-2019 SSR
ion for foundations and depositing on bank for all lifts and with an initial lead of 10m
our charges such as shoring ,sheeting, planking, strutting, etc. complete for finished
uding dewatering charges etc as per SS - 20 B (APSS 308).
1 day 0.00
1 day. 1547.00
309.40
1856.40
0.00
1856.40
0
1856.40
185.64
Rs 185.64
Aluminium paint data
Unit: 10 sqm
A. MATERIALS :
kg/Lt 2.100 258.00 541.8
B. LABOUR
Painter day 1.100 540.00 594
Add labour allowance @ 0.200 594.00 118.8
Sundries including brushes, soap, putty LS 1
etc.,
Total cost for 10 sqm 1255.6
Add overheads & contractor profit @ 13.615% 170.95
1426.55
Rate per one Sqm 142.66
Aluminium paint data
/sqm
drip irrigation data
DRIP IRRIGATION
S.NO
12b pH Lowering, Laying, jointing of PVC/HDPE/MDPE pipes as per BIS
SoR No.7634 part-III/75 for PVC and BIS No.7634 part-II/75 for
HDPE pipes including earth work excavation and testing to
1 hydralic test pressure including cost of water with a water lead
of 500m
etc., complete.including all material ,labour chaarges
DRIP IRRIGATION
37.00
18.00
350.00
405.00
55.14
460.14
1045.00
142.28
1187.28
491 of 2191 cc data
1 2 3 4 5 6 7
1 RBR-EECD-5 Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with
initial lif of 3 mts and lead upto 50 m as per Technical Specification Clause 302.3 MORD
5 Unit = cum
Taking output = 120 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 46.800 510.00 23868.00
23868.00
Overheads & Contractors Profit 13.615% 3249.63
Cost of 120 cum 27117.63
Rate per cum = (a+b+c)/120 225.99
2 RBR-FNDN-2 Filling (Quarry Rubbish) in foundation trenches as per drawing and technical specification Clause
305.3.9 MORD & 304 MORTH
3 III Gravel filling in foundation trenches as per the drawing and technical specification clause 305.3.9
MORD & 304 MORTH
Unit = cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 0.31 510.00 158.10
492 of 2191 cc data
RBR-FNDN-2 Supply and filling with HBG chips 2.36mm and below from approved quarry including cost
and conveyance, watering, tamping including all labour charges
Quarry dust
Unit = cum
Taking output = 6 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 0.31 510.00 158.10
Total 910.400
Rs.910.4/1 cum
493 of 2191 cc data
KODADA MUNICIPALITY
Data for providing Central double arm Lighting system with 12.0 mts hot-dip galvanized Octogonal
with 180 W LED luminaries
1 26877.0
9 Add over heads & contractor profit @ 13.615%
Total Rs
2 ELEC-7.3.7 Fabrication, Transportation and supply of 1.5mtrs
decorative galvanized Single arm bracket with PU paint complete
with all accessories with MS galvanized 50mm dia Pipe.
1 3885.0
9 Add over heads & contractor profit @ 13.615%
Total Rs
Fabrication, Transportation and supply of of 1.5 Mtr sword type or
any decorative double arm bracket with doomscomplete with all
accessories with MS galvanized 50mm dia Pipe.
1 5060.0
Add over heads & contractor profit @ 13.615%
Total Rs
496 of 2191 CL data
3 ELEC- Foundation and erection charges with special T&P, for 12Mtrs long
7.10.3 Octagonal / Conical pole duly erecting on base plate duly providing
4 Nos foundation bolts with nuts with providing of
0.67Mtrx0.67Mtrsx1.50 Mtr size M20 cc work vibrated concreting
mixing with necessary steel (20kgs) reinforcement as directed by
the field engineers during execution including all labour charges
and cost and conveyance of materials etc. complete.
1 7875.0
9 Add over heads & contractor profit @ 13.615%
Total Rs
3 ELEC- ELEC-4.1.10 : Supply of 10 Sqmm 4 Core XLPE insulated, 1100V
4.1.10 grade armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) of Makes : RPG / Finolex / Paragon / V-Guard /
Fortune Art / Suncab / Finecab / Gemscab / Payal.
1 140.0
Add over heads & contractor profit @ 13.615%
Total Rs
5 ELEC-4.1.1 Supply of 16 Sqmm 4 Core XLPE insulated, 1100V grade armoured
alluminium cable as per specification confirming to IS:7098 (Part -
I). Makes : Torrent / Universal / Unicab / Polycab / Havells / Gloster
/ KEI or equivalent
1 154
Add over heads & contractor profit @ 13.615%
Total Rs
5 ELEC-4.8.1 ELEC-4.8.1 : Supply and Transportation of Outer dia 63mm and
Inner dia 51mm double walled corrugated HDPE duct made as per
specification BSEN - 500 86/IS 14930 Part-II. Makes:DURA LINE
(Dura Guard) or its equivalent make.
1 117
Add over heads & contractor profit @ 13.615%
Total Rs
5 ELEC-1.6.4 ELEC-1.6.4 :Supply of 3 Core x 2.5 Sqmm FRLS armoured copper
cable as per IS. 7098 / Part-I / 1988 including all taxes etc.,
complete of make Universal/ CCI /Unicab/Polycab / Finolex / KEI /
Havells.
1 85.63
Add over heads & contractor profit @ 13.615%
Total Rs
497 of 2191 CL data
1 20
Add over heads & contractor profit @ 13.615%
Total Rs
5 ELEC-4.3.5 ELEC-4.3.5 : Supply and Fixing of double compression brass
cable glands for 4 core XLPE armoured cable up to 16.0 Sq.mm
with brass washers complete.
1 10
Add over heads & contractor profit @ 13.615%
Total Rs
5 TBSP-G.I- ELEC-9.1.56 : Supply and laying of 40mm Nominal Bore medium
11 grade G.I.Pipe including cost and conveyance etc, complete.
1 420
Add over heads & contractor profit @ 13.615%
Total Rs
5 ELEC-3.5.1 ELEC-3.5.1: Supply & Installtion of 25KW Automatic Street Light
Control System with Optical Sensor, Low volatage / High voltage
trip and reset, operating voltage 150 - 280V AC, 50 HZ with
suitable SMC enclousure of IP 54 protection, MCBs and contactor
suitable to control the load of 3 KW of single phase load with
necessary clamping arrangements. Makes : Swadeep Nature
Switch / Light Mate.
1 28000
Add over heads & contractor profit @ 13.615%
Total Rs
498 of 2191 CL data
1 113778
Add over heads & contractor profit @ 13.615%
Total Rs
4 ELEC- Supply and transportation of ......... LED Street light Body made of
3.11.1 high grade pressure die – cast Aluminium alloy with corrosion
resistant powder coat, having protective toughened glass cover,
Less Glare, IP 66 (Silicon gasket ensures Optical & Electrical
compartments are IP 66) protected, wide operating voltage range,
P.F > 0.90, System having efficacy >100 lumens/watt, with Ingress
protection IP66, Driver surge protection more than 4KV,
THD<15%, CCT: 3000- 6500K as desired by the department and as
per IS, CRI>80, Inbuilt Electrical protections like Over voltage,
short circuit, Over load, Open Circuit, Miswiring, etc complete with
5 years warranty .LUMINAIRE MAKE : PHILIPS / OSRAM / GE /
CROMPTON / BAJAJ / SCHREDER / VIN / HALONIX /HAVELLS / HPL
/ SURYA / SYSKA. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA
/ OSRAM / SAMSUNG / LG LEDs.
90 W 1 10562.0
9 Add over heads & contractor profit @ 13.615%
Total Rs
120 W 1 12884.0
Add over heads & contractor profit @ 13.615%
Total Rs
180 W 1 17229.0
Add over heads & contractor profit @ 13.615%
Total Rs
4 ELEC-2.9.1 Supply of 6-32 V, 10KA, SP MCB C/D Curve ISI Mark.
Makes : Legrand-DX3 / Schneider-Acti9 / Siemens / L&T Exora /
Cabtree.
1.00 17659.0
9 Add over heads & contractor profit @ 13.615%
Total Rs
13.5.1 Supply and fixing of 300mm x 260mm x 140mm No.16 gauge
BLD-ELEC-13-5
CRCA sheet box with hinged door and locking arrangements and
din channel for fixing 2Nos MCBs duly powder coated with
matching colour of poles including fixing with necessary
arrangments etc., complete.
a) Material
300x260x140mm 16 guage CRCA box finished of item (as per sqm 0.35
14.1.2)
MCB No 2.00
Sundries as rounding off
Sub total
add for over heads @ 13.615%
Sub Total
500 of 2191 CL data
8 ELEC-1.5.8 Supply of 4.0 Sqmm (56/0.3) 3 Core PVC Insulated and FRLS
Round Sheathed Multi Core Bright Annealed Bare Copper Conductor
Heavy Duty Industrial Cables for Voltage Grade upto 1100 Volts as
per IS: 694:1990 including all transportation charges etc complete.
Makes : Finolex / RR kabel / Havells / Polycab / RPG / KEI / Nakoda
/ Sun cab / Sudhakar / Powerflex/Gemni
KODADA MUNICIPALITY
per Amount
each 26877.00
3659.3
30536.30
each 3885.00
528.94
4413.94
each 5060.00
688.92
5748.92
502 of 2191 CL data
each 7875.00
1072.18
8947.18
mt 140.00
19.06
159.06
rmt 154.00
20.97
174.97
rmt 117.00
15.93
132.93
rmt 85.63
11.66
97.29
503 of 2191 CL data
Each 20.00
2.72
22.72
Each 10.00
1.36
11.36
mt 420.00
57.18
477.18
No 28000.00
3812.2
31812.20
504 of 2191 CL data
No 113778.00
15490.87
129268.87
each 10562.00
1438.02
12000.02
each 12884.00
1754.16
14638.16
each 17229.00
2345.73
19574.73
each 193.00
505 of 2191 CL data
26.28
219.28
each 193.00
26.28
219.28
each 193.00
26.28
219.28
each 17659.00
2404.27
20063.27
5753.81 2013.83
512.00 1024.00
200
3237.83
440.83
3678.66
506 of 2191 CL data
rmt 132.00
17.97
149.97
0.0014997
15.0015
rmt 47.00
Standard Data - Electrical Items For Buildings
Inde
x- Spe No. Description Unit Qty Rate Rs. Per
code
ELEC-1.4.22 30mm Screws No.8, 100 Nos 200 Nos 89.00 100
ELEC-1.1.34 20mm Saddles MS, 100 Nos 200 Nos 211.00 100
ELEC-1.1.6 20mm 1,2,3 & 4 way Junction box, Dozen 12 Nos 27.00 1
1.1.2 Supply and Fixing of 25mm dia 16 SWG (ISI MARK) MS Surface pipe duly threading at Joints with
accessories fixing on T.W. Seperators with chromium plated base saddles and No.18 SWG MS box for ru
including cost of Cement, all materials, accessories and all labour charges etc., complete.
ELEC-1.1.7 25mm 1,2,3 & 4 way Junction box, Dozen 6.00 Nos 28.80 1
1.1.3 Supply and Fixing of 32mm dia 16 SWG (ISI MARK) MS Surface pipe duly threading at Joints with
accessories fixing on T.W. Seperators with chromium plated base saddles and No.18 SWG MS box for ru
including cost of Cement, all materials, accessories and all labour charges etc., complete.
Unit = 1Metre
Taking Output = 100 M 100 m
a) Material
ELEC-1.1.3 32mm dia 16 SWG MS conduit, 100 M 100 m 178.50 1
ELEC-8.1.8 T.W seperators, 100 Nos 150 Nos 165.00 100
ELEC-1.4.37 38mm Screws No.8, 100 Nos 150 Nos 96.00 100
ELEC-8.1.9 Rawal Plugs, 100 Nos 150 Nos 28.00 100
ELEC-1.4.34 12mm Screws, 100 Nos 300 Nos 59.00 100
ELEC-1.1.41 32mm Saddles MS, 100 Nos 150 Nos 244.00 100
ELEC-1.2.35 32mm 1,2,3 & 4 way Junction box, Dozen 6 Nos 26.00 12
ELEC-1.1.16 32mm dia HG bends, Dozen 12 Nos 58.00 12
Cement (As per civil SSR) kg 12.5 Kg 4.60 1
b) Labour charges :
Skilled Electrician day 3.00 day 648.00 1
Semi skilled Electrician day 3.00 day 540.00 1
Helpers day 3.00 day 540.00 1
Sundries
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = Total/100
BLD-ELEC-1-2.1
1.2.2 Supply and Fixing of 25mm dia 16 SWG (ISI MARK) MS concealed conduit, duly threadig at Joints in S
wall with required accessories including chiselling the wall and necessary Masonary and all labour ch
complete for run of mains.
Cement kg 50 Kg 4.60 1
b) Labour charges :
Skilled Electrician day 3 day 648.00 1
Semi skilled Electrician day 3 day 540.00 1
Helpers day 3 day 540.00 1
Mason Ist class day 3 day 564.00 1
Sundries
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
NOTE : For Laying MS Concealed Conduit
pipe in roof Slab, deduct the Cost of Cement
and U' Nails.
1.3 P.V.C. Conduit (Surface)
1.3.1 Supply and Fixing of 20mm dia 1.5mm thick
BLD-ELEC-1-3-1
ELEC-1.2.26 20mm 1,2,3 & 4 way Junction box, Each 12 Nos 17.00 1
Cement kg 25 Kg 4.60 1
b) Labour charges :
Skilled Electrician day 2 day 648.00 1
Semi skilled Electrician day 2 day 540.00 1
Helpers day 2 day 540.00 1
Sundries
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
1.3.2 Supply and Fixing of 25mm dia 1.5mm thick
BLD-ELEC-1-3-2
Cement kg 25 Kg 4.60 1
b) Labour charges :
Skilled Electrician day 2 day 648.00 1
Semi skilled Electrician day 2 day 540.00 1
Helpers day 2 day 540.00 1
Sundries
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
1.3.3 Supply and Fixing of 32mm dia 2.5mm thick
BLD-ELEC-1-3-3
ELEC-1.2.28 32mm 1,2,3, & 4 way Junction boxes, Each 12 Nos 34.00 1
Cement kg 25 Kg 4.60 1
b) Labour charges :
Skilled Electrician day 2 day 648.00 1
Semi skilled Electrician day 2 day 540.00 1
Helpers day 2 day 540.00 1
Sundries
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
1.3.4 Supply and Fixing of 40mm dia 2.5mm thick
BLD-ELEC-1-3-4
Cement kg 25 Kg 4.60 1
b) Labour charges :
Skilled Electrician day 2 day 648.00 1
Semi skilled Electrician day 2 day 540.00 1
Helpers day 2 day 540.00 1
Sundries
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
1.3.5 Supply and Fixing of 50mm dia 2.5mm thick
BLD-ELEC-1-3-5
ELEC-1.2.30 50mm 1,2,3, & 4 way Junction boxes, Each 12 Nos 51.00 1
Cement kg 25 Kg 4.60 1
b) Labour charges :
Skilled Electrician day 2 day 648.00 1
Semi skilled Electrician day 2 day 540.00 1
Helpers day 2 day 540.00 1
Sundries
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
1.4 P.V.C. Conduit (Concealed)
1.4.1 (a) Supply and Fixing of 20mm dia 2mm thick
BLD-ELEC-1-4-1a
ELEC-1.2.31 20mm dia 1,2,3 & 4 way deep Junction Box, Each 12 Nos 22.00 1
Cement kg 50 Kg 4.60 1
b) Labour charges :
Skilled Electrician day 2 day 648.00 1
Semi skilled Electrician day 2 day 540.00 1
Helpers day 2 day 540.00 1
Mason Ist class day 2 day 564.00 1
Sundries
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
(b) Supply and Fixing of 20mm dia 1.5mm thick
P.V.C. pipe (ISI MARK) concealed in wall
BLD-ELEC-1-4-1b
Cement kg 50 Kg 4.60 1
b) Labour charges :
Skilled Electrician day 2 day 648.00 1
Semi skilled Electrician day 2 day 540.00 1
Helpers day 2 day 540.00 1
Mason Ist class day 2 day 564.00 1
Sundries
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
BLD-ELEC-1-4-2B
ELEC-1.2.32 25mm dia 1,2,3 & 4 way deep Junction Box, Each 12 Nos 25.00 100
b) Labour charges :
Skilled Electrician day 1 day 648.00 1
Semi skilled Electrician day 1 day 540.00 1
Helpers day 2 day 540.00 1
Sundries such as screws, Rawal Plugs, LS
Gutting, Cement, Sand and Rounding off.
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
1.5.3 Supply and Laying of P.V.C casing and
caping (ISI MARK) with double locking
BLD-ELEC-1-5-3
a) Material
ELEC-1.5.1 14/0.3mm PVC FR flexible copper wire, 100 M 100 m 1051.00 100
ELEC-1.4.12 25 x 20 cms (10" x8") Decolam Board sqm 0.05 Nos 73.00 1
b) Labour charges :
Skilled Electrician day 0.60 day 648.00 1
Semi skilled Electrician day 1.20 day 540.00 1
Helpers day 0.60 day 540.00 1
C) Cost for 6 Points
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Point = C/6
2.1.2 Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm)
P.V.C. insulated F.R flexible copper cable
(ISI MARK) in existing pipe with 6A switch,
BLD-ELEC-2-1-2
a) Material
ELEC-1.5.1 14/0.3mm PVC FR flexible copper wire, 100 M 100 m 1051.00 100
ELEC-1.7.1 6A Switch, each 7 Nos 18.00 1
ELEC-1.7.13 6A 2 way Ceiling Rose, ELEC-1.7.15 each 7 Nos 21.00 1
ELEC-1.4.19 25 x 20 cms (10" x8") Hylam sheet 3mm sqm 0.05 Nos 73.00 1
thick,
b) Labour charges :
Skilled Electrician day 0.70 day 648.00 1
Semi skilled Electrician day 1.40 day 540.00 1
Helpers day 0.70 day 540.00 1
C) Cost for 7 Points
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Point = C/7
2.1.3 Wiring with 2 of 14/0.3mm (1.0 Sq.mm)
BLD-ELEC-2-1-3 P.V.C. insulated F.R. flexible copper cable
(ISI MARK) in existing pipe with 6A switch
control and 3/2 pin sockets fixing on
separate board including all labour charges
etc., complete.
b) Labour charges :
Skilled Electrician day 1.50 day 648.00 1
Semi skilled Electrician day 1.50 day 540.00 1
Helpers day 1.50 day 540.00 1
C) Cost for 15 Points
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Points = C/15
2.1.4 Supply and fixing of 6A 3 pin wall plug
BLD-ELEC-2-1-4
b) Labour charges :
Skilled Electrician day 0.05 day 648.00 1
Helpers day 0.05 day 540.00 1
b) Labour charges :
Semi Skilled Electrician day 0.125 day 648.00 1
Mason 2nd class day 0.125 day 540.00 1
Welder 2nd Class day 0.125 day 540.00 1
b) Labour charges :
Skilled Electrician day 0.05 day 648.00 1
Helpers day 0.05 day 540.00 1
b) Labour charges :
Skilled Electrician day 0.05 day 648.00 1
Helpers day 0.05 day 540.00 1
b) Labour charges :
Skilled Electrician day 0.062 day 648.00 1
Helpers day 0.062 day 540.00 1
b) Labour charges :
Skilled Electrician day 0.062 day 648.00 1
Helpers day 0.062 day 540.00 1
b) Labour charges :
Skilled Electrician day 0.062 day 648.00 1
Helpers day 0.062 day 540.00 1
copper cable
3.1.1 Supply and run of 2 of 14/0.3mm (1.0
Sq.mm) F.R P.V.C. insulated flexible copper
cable in existing pipe for mains inlcuding all
labour charges etc., complete.
b) Labour charges :
Skilled Electrician day 0.34 day 648.00 1
Semi Skilled Electrician day 1.00 day 540.00 1
Helpers day 0.34 day 540.00 1
Sundries
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
Note : Labour Charges considered for 150 M / day
3.1.3 Supply and run of 2 of 22/0.3mm (1.5
BLD-ELEC-3-1-3
b) Labour charges :
Skilled Electrician day 0.67 day 648.00 1
Semi Skilled Electrician day 2.00 day 540.00 1
Helpers day 0.67 day 540.00 1
Sundries
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
Note : Labour Charges considered for 150 M / day
3.1.4 Supply and run of 2 of 36/0.3mm (2.5
BLD-ELEC-3-1-4
Sq.mm) F.R P.V.C. insulated flexible copper
cable in existing pipe for mains inlcuding all
labour charges etc., complete.
b) Labour charges :
Skilled Electrician day 0.67 day 648.00 1
Semi Skilled Electrician day 2.00 day 540.00 1
Helpers day 0.67 day 540.00 1
Sundries
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
Note : Labour Charges considered for 150 M / day
3.1.4 (a) Supply and run of 1 of 36/0.3mm (2.5
BLD-ELEC-3-1-4
b) Labour charges :
Skilled Electrician day 0.34 day 648.00 1
Semi Skilled Electrician day 1.00 day 540.00 1
Helpers day 0.34 day 540.00 1
Sundries
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
Note : Labour Charges considered for 150 M / day
3.1.5 Supply and run of 2 of 56/0.3mm (4 Sq.mm)
BLD-ELEC-3-1-5
b) Labour charges :
Skilled Electrician day 0.167 day 648.00 1
Semi Skilled Electrician day 0.167 day 540.00 1
Helpers day 0.333 day 540.00 1
Sundries such as hardware etc., LS
b) Labour charges :
Skilled Electrician day 0.167 day 648.00 1
Semi Skilled Electrician day 0.167 day 540.00 1
Helpers day 0.333 day 540.00 1
Sundries such as hardware etc., LS
ELEC-2.5.3 Supply of 125A to 200A HRC Fuse Links of makes L & T each 1 Nos 248.00 1
/ G E/ C & S / Standard / HPL / Havells.
b) Labour charges :
Skilled Electrician day 0.167 day 648.00 1
Semi Skilled Electrician day 0.167 day 540.00 1
Helpers day 0.333 day 540.00 1
Sundries such as hardware etc., LS
b) Labour charges :
Skilled Electrician day 0.200 day 648.00 1
Semi Skilled Electrician day 0.400 day 540.00 1
Helpers day 0.400 day 540.00 1
Sundries such as hardware etc., LS
b) Labour charges :
Skilled Electrician day 0.20 day 648.00 1
Semi Skilled Electrician day 0.40 day 540.00 1
Helpers day 0.40 day 540.00 1
Sundries such as hardware etc., LS
b) Labour charges :
Skilled Electrician day 0.25 day 648.00 1
Semi Skilled Electrician day 0.5 day 540.00 1
Helpers day 0.5 day 540.00 1
Sundries such as hardware etc., LS
b) Labour charges :
Skilled Electrician day 0.25 day 648.00 1
Semi Skilled Electrician day 0.5 day 540.00 1
Helpers day 0.5 day 540.00 1
Sundries such as hardware etc., LS
IS 13947-3-1993.
4.2.1 Supply and erection of Panel mounting
cubical type L.T heavy duty ON LOAD
change over switch of 60 / 63A, 4 pole,
415V, 50 Hz. with all accessories etc.,
complete on existing control panel.
Taking Output = each 1 No
a) Material
ELEC-2.2.1 60 / 63A, 4 Pole, 415V, 50 Hz. On load each 1 Nos 4135.00 1
cubical type C.O.S,
b) Labour charges :
Skilled Electrician day 0.167 day 648.00 1
Semi Skilled Electrician day 0.167 day 540.00 1
Helpers day 0.333 day 540.00 1
outgoing.
Taking Output = each 1 No
a) Material
ELEC-2.12.3 SPN 12 way D.B with IP-20 Protection each 1 Nos 1045.00 1
suitable for single phase ECCB / RCCB/ DP
Isolator.
ELEC-2.10.2 40A D.P.Isolator / ECCB / RCCB, each 1 Nos 367.00 1
b) Labour charges :
Skilled Electrician day 0.50 day 648.00 1
Semi Skilled Electrician day 1.00 day 540.00 1
Helpers day 1.00 day 540.00 1
Sundries, suchas T.W plugs, Screws, LS
Cement etc,
a) Material
ELEC-2.12.25 8 Way TPN Vertical DB with IP -42 (Metal Nos 1 Nos 9823.00 1
door) protection suitable for 125A, 4 Pole,
16kA MCCB as incomer.
ELEC-2.8.6 125 Amps, 4 Pole , 25 kA MCCB, Nos 1 Nos 8700.00 1
a) Material
ELEC-2.12.26 1 Phase Distribution board with 20A plug Nos 1 Nos 901.00 1
and socket.
ELEC-2.9.1 10/16/20A SP MCB, Nos 1 Nos 201.00 1
b) Labour charges :
Skilled Electrician Nos 0.25 day 648.00 1
Semi skilled Electrician Nos 0.25 day 540.00 1
Helpers Nos 0.25 day 540.00 1
Sundries such as Cement, Sand, T.W. Plugs, LS
Screws etc.,
a) Material
ELEC-2.12.27 Distribution board with TP. 20A Plug and Each 1 Nos 1700.00 1
Socket .
ELEC-2.9.5 32A TP MCB, 10 kA, Each 1 Nos 955.00 1
b) Labour charges :
Skilled Electrician Nos 0.33 day 648.00 1
Semi skilled Electrician Nos 0.33 day 540.00 1
Helpers Nos 0.33 day 540.00 1
Sundries such as Cement, T.W. Plugs,
Screws etc.,
a) Material
Earth Work Excavation of Hard gravel Soil cum 0.85 cum 122.30 1
with small boulder for trench 1st step of size
1.5 x 0.6 x 0.9 m (5'x2'x3') - Sump data
ELEC-9.1.44 & 25 x 6 mm (1"X 1/4") G.I Flat duly drilled Each 1 Nos 16.32 1
ELEC-9.1.34
12mm holes (4 Nos) of 200 mm (8") length
(@1.20Kg/Rmt) =0.2x1.2=0.24Kg -
ELEC-9.1.57 Drilling of 16 Nos through holes of 12mm dia Each 16 Nos 6.00 1
to G.I pipe,
ELEC-9.1.58 G.I Nuts, Bolts an Washers, Set 4 Set 11.00 1
a) Material
Earth work excavation of hard gravel soil cum 1.27 cum 122.30 1
with small boulders for trench 1st step of
size 1.5 x 0.9 x 0.9 m (5'x3'x3')
Earth work hard disintegrated rock and cum 1.87 cum 620.55 1
boulders for trench 2nd Step of size 1.2 x
0.9 x 1.65 m (Civil SSR-16) (4'x3'x5.5')
25% extra for trenches and narrow Pit, back
filling and blending.
Laying C.C bed in Cement mortar with 1: 2:4 cum 0.90 cum 4352.74 1
with 20 mm HBG Stone Metal (Civil SSR).
Bld Upto 3 f Masonary through with brick Masonry with cum 0.23 cum 3526.80 1
5.1.39
CM 1:3
Mortars Cement plastering inside through with 1:3 sqm 2.09 Sqm 3487.19 10
Cement mortar, 12 mm thick (Civil SSR).
ELEC-9.1.55 40mm dia G.I pipe Class 'B' (Civil SSR), Mtr 2.50 m 355.00 1
ELEC-8.1.62
BMW-F.81 20.mm dia G.I pipe, Mtr 0.30 m 192.00 1
40mm x 19mm reducer (Pudu SSR ) Each 1.00 Nos 63.00 1
ELEC-9.1.28 G.I Funel covered with wire mesh, ELEC- Each 1.00 Nos 83.00 1
8.1.36
ELEC-9.1.44 & 25mm x 6mm x 200 mm length G.I Strip Each 1.00 Nos 16.32 1
ELEC-9.1.34
(Flat) with 4 Nos. Holes of 12mm dia.
ELEC-9.1.57 Drilling of staggered holes of 12mm dia to Each 16.00 Nos 6.00 1
G.I pipe.
G.I Bolts, Nuts and Washers.BMS- Set 4.00 Set 11.00 1
W.63,BMS-W.65
ELEC-9.1.9 Hard Coke, kg 4.00 Kg 15.00 1
ELEC-9.1.10 Salt, kg 20.00 Kg 10.00 1
Cost Iron cover 400 mm x 400mm x 50mm. L.S 1 Nos 400.00 1
a) Material
Earth work excavation of hard gravel soil cum 1.27 cum 122.30 1
with small boulders for trench 1st step of
size 1.5 x 0.9 x 0.9 m (5'x3'x3')
Earth work hard disintegrated rock and cum 1.87 cum 620.55 1
boulders for trench 2nd Step of size 1.2 x
0.9 x 1.65 m (Civil SSR-16) (4'x3'x5.5')
25% extra for trenches and narrow Pit, back
filling and blending.
Laying C.C bed in Cement mortar with 1: 2:4 cum 0.90 cum 4352.74 1
with 20 mm HBG Stone Metal (Civil SSR).
Masonary through with brick Masonry with cum 0.23 cum 3526.80 1
CM 1:3
Cement plastering inside through with 1:3 sqm 2.09 Sqm 3487.19 10
Cement mortar, 12 mm thick (Civil SSR).
ELEC-9.1.55 40mm dia G.I pipe Class 'B' (Civil SSR), Mtr 2.50 m 355.00 1
19mm dia G.I pipe, BMW-F.81 Mtr 0.30 m 192.00 1
(Pudu SSR ) 40mm x 19mm reducer Each 1.00 Nos 63.00 1
ELEC-9.1.28 G.I Funel covered with wire mesh, Each 1.00 Nos 83.00 1
ELEC-9.1.44 & E25mm x 6mm x 200 mm length G.I Strip Each 1.00 Nos 16.32 1
(Flat) with 4 Nos. Holes of 12mm dia.-
ELEC-9.1.34 600mm x600mm x 3.15mm thick copper kg 10.00 Kg 605.00 1
plate,
ELEC-9.1.57 Drilling of staggered holes of 12mm dia to Each 16.00 Nos 6.00 1
G.I pipe.
G.I Bolts, Nuts and Washers.BMS- Set 4.00 Set 11.00 1
W.63,BMS-W.65
ELEC-8.1.16 Hard Coke, kg 4.00 Kg 15.00 1
ELEC-8.1.17 Salt, kg 20.00 Kg 10.00 1
Cost Iron cover 400 mm x 400mm x 50mm. L.S 1 Nos 400.00 1
b) labour charges
Helpers day 2 day 540.00 1
Sundries.
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
5.2.2 Supply and Run of No.10 SWG G.I wire 100 m
BLD-ELEC-5-2-2
ELEC-8.1.45 40mm x 6mm G.I Strip 100 M Length (1.88 kg 188 Kg 68.00 1
Kg / Mtr) -
b) labour charges
Skilled Electrician Nos 2 day 648.00 1
Helper Nos 2 day 540.00 1
Sundries such as T&P.
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
5.2.7 Supply and Run of 50mm x 6mm G.I Strip 100 m
BLD-ELEC-5-2-7
a) Material
ELEC-1.6.1 2.5 Sq.mm WPSC Aluminium cable, 100 M 200 m 737.00 100
ELEC-9.1.39 No.10 SWG G.I wire. (0.026 Kg / Mtr) Length kg 6.70 Kg 68.00 1
100 RM,
ELEC-9.1.11 PVC Cleats, 100 Nos 100 Nos 330.00 100
b) labour charges
Skilled Electrician day 1 Nos 648.00 1
Semi skilled day 1 Nos 540.00 1
Helper day 1 Nos 540.00 1
Sundries such as insulation tapes and
rounding off
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
6.1.2 Supply and Run of 2 of 6 Sq.mm WPSC 100 m
Aluminium cable along with No.10 SWG G.I
bearer wire through PVC cleats with all
BLD-ELEC-6-1-2
ELEC-9.1.39 No.10 SWG G.I wire. (0.026 Kg / Mtr) Length kg 6.70 Kg 68.00 1
100 RM,
ELEC-9.1.11 PVC Cleats, 100 Nos 100 Nos 330.00 100
b) labour charges
Skilled Electrician day 1 Nos 648.00 1
Semi skilled day 1 Nos 540.00 1
Helper day 1 Nos 540.00 1
Sundries such as insulation tapes and
rounding off
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
6.1.3 Supply and Run of 2 of 10 Sq.mm WPSC 100 m
Aluminium cable along with No.10 SWG G.I
bearer wire through PVC cleats with all
BLD-ELEC-6-1-3
ELEC-9.1.39 No.10 SWG G.I wire. (0.026 Kg / Mtr )Length kg 6.7 Kg 68.00 1
100 RM,
ELEC-9.1.11 PVC Cleats, 100 Nos 100 Nos 330.00 100
b) labour charges
Skilled Electrician day 1 Nos 648.00 1
Semi skilled day 1 Nos 540.00 1
Helper day 1 Nos 540.00 1
Sundries such as insulation tapes and
rounding off
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
6.1.4 Supply and Run of 4 of 6 Sq.mm WPSC 100 m
Aluminium cable along with No.10 SWG G.I
bearer wire on both sides through PVC
BLD-ELEC-6-1-4
a) Material
ELEC-1.6.2 6 Sq.mm WPSC Aluminium cable, 100 M 400 m 1497.00 100
ELEC-9.1.39 No.10 SWG GI Wire (6.7kg x 2) Length 200 kg 13.4 Kg 68.00 1
RM,
ELEC-9.1.13 Binding wire, kg 0.25 Kg 61.00 1
ELEC-9.1.12 PVC Cleats / Separters 4 W. 100 Nos 100 Nos 440.00 100
b) labour charges
Skilled Electrician day 2 Nos 648.00 1
Semi skilled day 2 Nos 540.00 1
Helper day 2 Nos 540.00 1
Sundries such as insulation tapes and
rounding off
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
6.1.5 Supply and Run of 4 of 10 Sq.mm WPSC 100 m
Aluminium cable along with No.10 SWG G.I
bearer wire on both sides through PVC
BLD-ELEC-6-1-5
a) Material
ELEC-1.6.3 10 Sq.mm WPSC Aluminium cable 100 M 400 m 1611.00 100
Cable
6.2.1 Supply and Run of 1 of 6 Sq.mm WPTC 100 m
Aluminium cable along with No.10 SWG G.I
bearer wire through PVC cleats with all
accessories including labour charges etc.,
complete.
a) Material
ELEC-1.6.5 6 Sq.mm (7/18) wptc Aluminium cable, 100 M 100 m 3017.00 100
ELEC-9.1.17 M.S Clamp 25mm x 6mm with bolts and each 1 Nos 200.00 1
nuts,
ELEC-7.15.5 Pin insulators 100 x 80 mm (4"x3 1/2"), each 3 Nos 90.00 1
a) Material
ELEC-9.1.17 Stay rod of 16mm dia (7/8 SWG) 1560mm each 1 Nos 200.00 1
length with bolts and nuts with switch plate.
ELEC-9.1.16 Stay tight set (Jum Bracket 300mm), pair 1 Pair 300.00 1
b) labour charges
Skilled Electrician. day 0.5 Nos 648.00 1
Man Mazdoor day 1 Nos 540.00 1
a) Material
ELEC-8.1.32 50 x 50 x 6 mm (2"x2"x1/4") Angle Iron of kg 5.32 kg #REF! 1
1.52 Mtr length,
38 x 38 x 6 mm (1.5"x1.5"x1/4") Angle Iron kg 1.57 kg #REF! 1
of 0.45 Mtr
Special Flat Iron Clamp 25x6mm with bolts each 1 Nos 200.00 1
and nuts, ELEC-8.1.24
ELEC-8.1.45 No.8 SWG G.I wire 8m Length, kg 0.80 kg #REF! 1
b) labour charges
Skilled Electrician day 0.25 day 648.00 1
Semi skilled day 0.25 day 540.00 1
Helper day 0.50 day 540.00 1
Sundires such as bolts, nuts including
soldering.
a) Material
ELEC-7.15.11 7/2.5 AAAC / Weasel (34 Sq.mm), km 1000 m 15383.00 1000
ELEC-6.5.12 7/2.5 AAAC for binding and Jumpering. km 100 m 15383.00 1000
ELEC-9.1.17 Aluminium Clamps, each 10 Nos 200.00 1
b) labour charges
Skilled Electrician day 2 day 648.00 1
Helper day 8 day 540.00 1
For special T&P LS
Sundires and rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per km
BLD-ELEC-6-3-5C
a) Material
PVC spacer suitable for 3 to 5 conductos. each 1 1
b) labour charges
Helper day 0.2 #REF! 1
Special T&P. LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per km
Note : 1. Labour Charges considered for 5 jobs / day
BLD-ELEC-6-3-7 6.3.7 Excavation of hard rock or Bituminous road
(BT) by chiselling for preparing pit for poles /
stay / earth plates / laying pipes, including
clearing the site by removing debris and
making the site to original position.
a) Material
Cutting B.T road surface (As per Civil SSR) cum 1 cum 518.00 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
BLD-ELEC-6-3-8A
Total
Rate per cum
6.3.8 (c) CRS Masonry in CM (1:6) 2nd Sort
Unit = 1cum
a) Material
Coursed Rubble Stone cum 0.94 18.00 1
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = cum 0.16
0.16cum
Cement Mortar 1:6 cum 0.32 2095.19 1
b) labour charges
Mason 1st class day 0.45 #REF! 1
Mason 2nd class day 1.05 #REF! 1
Mazdoor (unskilled) day 2.32 Err:509 1
Add 25% extra on labour for isolated work
Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per cum
6.3.9 (a) Supply Transportation and unloading the
BLD-ELEC-6-3-9A
a) Material
9.1 Mtr PSCC pole of 300 Kg working load each 1 0
Transportation Charges @ 5% of Cost
Helper for Unloading day 0.5 540.00 1
Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : 1. Unloading Charges considered for 12 jobs / 6
6.3.9 (b) Helpers
Supply /Transportation
day and unloading the
BLD-ELEC-6-3-9B
a) Material
ELEC-7.15.12 9.1 Mtr PSCC pole of 280 Kg working load each 1 3129.00 1
a) Material
8 Mtr PSCC pole of 200 Kg working load each 1 1665.00 1
Transportation Charges @ 5% of Cost
Helper for Unloading day 0.5 540.00 1
Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : 1. Unloading Charges considered for 12 jobs / 6
Helpers / day
6.3.9 (d) Supply, Transportation and unloading the
BLD-ELEC-6-3-9D 8.0mtr long PSCC poles with 140kg working
load at site in good condition for H.T. / L.T.
lines support including cost and conveyance
of all materials and labour charges etc.,
complete.
a) Material
ELEC-7.15.13 8 Mtr PSCC pole of 140 Kg working load each 1 1665.00 1
a) Material
ELEC-7.15.14 175mm x 85mm, 9.0 Mtr long R.S.Joist (1mt kg 176.4 50.00 1
= 19.6 Kg)
Transportation Charges @ 5% of Cost
Helper for Unloading day 0.33 540.00 1
Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : 1. Unloading Charges considered for 20 jobs / 6
6.3.10 (b) HelpersTransportation
Supply / day and unloading the RS
BLD-ELEC-6-3-10B
a) Material
ELEC-7.15.14 150mm x 75mm, 8.0 Mtr long R.S.Joist (1mt kg 120 50.00 1
= 15.0 Kg)
Transportation Charges @ 5% of Cost
Helper for Unloading day 0.33 540.00 1
Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : 1. Unloading Charges considered for 20 jobs / 6
7 Helpers
STREET/ day
LIGHT LUMINARIES (BLD-ELEC-
7)
7.1 FLOURESCENT LUMINAIRE
BLD-ELEC-7-1-1 7.1.1 Supply of 1x40W weatherproof flourescent
streetlight fitting comprising canopy of sheet
Aluminium in stove enamel finish with
copper / VPIT ballast, capacitor, tube and
starter etc., complete.
a) Material
ELEC-3.1.1 1x40W WP flourscent street light fitting. each 1 1260.00 1
a) Material
ELEC-3.3.4 125W MV Lamp fitting single piece die cast each 1 652.00 1
Aluminium body with copper wound ballast
and capacitor
ELEC3.4.41 125W MV lamp each 1 #REF! 1
Sundries and rounding off
Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
7.3 High Pressure Sodium Vapour (S.V.)
LUMINAIRE
7.3.1 Supply of Integral street light luminaire of
BLD-ELEC-7-3-1
a) Material
ELEC-3.1.4 70W HPSV Lamp fitting single piece die cast each 1 2570.00 1
Aluminium body with copper wound ballast
and capacitor, Ignitor, with pot optics
a) Material
ELEC-3.1.14 150W HPSV Lamp fitting single piece die each 1 #REF!
cast Aluminium body with copper wound
ballast and capacitor, Ignitor, with pot optics
a) Material
ELEC-3.1.17 250W HPSV Lamp fitting single piece die each 1 #REF! 1
cast Aluminium body with copper wound
ballast and capacitor, Ignitor, with pot optics
of makes Wipro / G.E./ Phillips
(ELEC-3.4.13) 250W HPSV lamp of makes Wipro / G.E./ each 1 #REF! 1
Phillips / Osram.
Sundries and rounding off
Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
7.4 METAL HALIDE LUMINAIRE
7.4.1 Supply of Integral street light luminaire of
BLD-ELEC-7-4-1
a) Material
ELEC-3.1.4 70W MH Lamp fitting single piece die cast each 1 2570.00 1
Aluminium body with copper wound ballast
and capacitor, Ignitor, with pot optics
a) Material
ELEC-3.1.6 150W MH Lamp fitting single piece die cast each 1 3975.00 1
Aluminium body with copper wound ballast
and capacitor, Ignitor, with pot optics
a) Material
ELEC-3.1.8 250W MH Lamp fitting single piece die cast each 1 4340.00 1
Aluminium body with copper wound ballast
and capacitor, Ignitor, with pot optics of
makes Wipro / G.E./ Phillips.
ELEC-3.4.21 250W MH lamp each 1 1350.00 1
a) Material
ELEC-3.1.8 250W IP-65 MH Lamp fitting single piece each 1 4340.00 1
die cast Aluminium body with copper wound
ballast and capacitor makes Wipro / G.E./
Phillips
ELEC-3.4.22 Lamp cost of 250W MH lamp each 1 1100.00 1
a) Material
ELEC-3.2.1 1X18W CFL Lamp fitting each 1 1838.00 1
a) Material
125W HPMV post top Lamp fitting each 1 #REF! 1
ELEC-3.4.42 Cost of 125W HPMV post top LAMP each 1 #REF! 1
Sundries and rounding off
Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
7.5.3 Supply of 70W HPSV integral post top
BLD-ELEC-7-5-3
a) Material
ELEC-3.2.2 70W HPSV post top Lamp fitting each 1 3822.00 1
a) Material
ELEC-3.1.32 250W MH flood light fitting each 1 #REF! 1
ELEC-3.4.22 250W MH lamp. each 1 1100.00 1
a) Material
ELEC-3.1.10 400W MH flood light fitting each 1 5765.00 1
a) Material
ELEC-1.1.1 20mm dia No.16 gauge MS conduit pipe . M 1 99.00 1
ELEC-1.6.8 23/0060 twin core flexible copper cable each 1 1040.00 1
Anchor screws / Hooks / Sockets & Check each 2 1
b) Labour charges
Skilled Electrician/carpenter day 0.166 Err:509 1
Semi skilled Electrician / Helper day 0.166 Err:509 1
Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 6
fixtures / day .
7.9.5 Fixing of 40W street light luminaire to the
BLD-ELEC-7-9
a) Material
ELEC-9.1.55 40mm G.I pipe for Bracket M 1 355.00 1
b) Labour charges
Skilled Electrician day 0.04 Err:509 1
Helper day 0.04 Err:509 1
Sundires LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 25Jobs per Day
BLD-ELEC-8.1
b) Labour charges
Skilled Electrician day 0.05 Err:509 1
Helper day 0.05 Err:509 1
Sundires
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 20
Jobs / Day
8.1.4 Supply and fixing of Bulk head fitting with
BLD-ELEC-8.1
b) Labour charges
Skilled Electrician day 0.083 Err:509 1
Helper day 0.083 Err:509 1
Sundires such as TW block / screws, cement
etc.,
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 12
Jobs / Day
Bldngs_Elec-8-2
8.2 Flourescent Luminaire
8.2.1 Supply and transportation of 1x11 W mirror
BLD-ELEC-8.2
a) Material
ELEC-3.6.2 1x11W M.O. fitting each 1 578.00 1
a) Material
ELEC-3.6.4 1x40/36 box type T.L fitting each 1 766.00 1
a) Material
ELEC-3.6.6 2x40/36 box type T.L fitting each 1 1173.00 1
a) Material
ELEC-3.6.7 2x36/40 Surface M.O.L fitting each 1 2300.00 1
a) Material
ELEC-3.6.7 2x36/40 Recessed M.O. L fitting each 1 2300.00 1
a) Material
2x11W CFL recessed M.O.L fitting each 1
11W cfl each 2
Sundries and rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
8.4.5 Supply and transportation of 2x36w CFL
BLD-ELEC-8.4
a) Material
ELEC-3.6.36 1x28w pendant T5 lugs fitting each 1 540.00 1
a) Material
2x28w T5 M.O. fitting each 1
28w T5 FTL each 2
Sundries and rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
8.6 C.F.L. Down Lights
8.6.1 Supply and transportation of recessed
BLD-ELEC-8.6
a) Material
ELEC-3.6.10 1x18W CFL Down light fitting each 1 750.00 1
a) Material
ELEC-3.1.10 70W M.H down light fitting each 1 #REF! 1
ELEC-3.3.7 70W M.H lamp each 1 #REF! 1
Sundries and rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
BLD-ELEC-8.6 8.6.6 Supply and Transportation of Ceiling / Wall
mounted Circular 1x13W luminaire with
decorative acrylic diffuser and 1 No. 13W
CFL lamp (circular type) etc., complete.
a) Material
1x13W Circular CFL fitting each 1
13W CFL each 1
Sundries and rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
8.6.7 Supply and Transportation of Ceiling / Wall
BLD-ELEC-8.6
a) Material
2x13W Circular CFL fitting each 1
13W CFL each 2
Sundries and rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
8.7 HALOGEN DOWN LIGHTERS
8.7.1 Supply and Transportation of recess
BLD-ELEC-8.7
a) Material
1.5 Ton A.C Unit
ADD : Duties & Taxes as applicable
Transportation on Material 2%
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
9.1.1(b) Supply and Transportation of Window
mounted type, Room Air-Conditioner 2.0 Ton
BLD-ELEC-9-1
a) Material
2.0 Ton A.C Unit 0.00
ADD : Duties & Taxes as applicable
Transportation on Material 2%
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
9.1.2 (a) Supply and Transportation of 1.5 Ton Split
type Air-Conditiner, fitted with Hermetically
sealed compressor, Operating on refrigerant
R-22 / Non - CFC High wall mounting
BLD-ELEC-9-1-2A
a) Material
ELEC-6.1.1f 2.0 Ton Split ABS Plastic Cabin A.C Unit 56490.00 1
ADD : Duties & Taxes as applicable
Transportation on Material 2%
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
9.1.3 Installation Charges for 1/0 / 1.5 / 2.0 Ton
BLD-ELEC-9-1
a) Material
Well seasoned wooden frame for Window cum 0.018
A.C Units
b) Labour charges for fabrication &
Fixing
Carpenter day 0.5 #REF! 1
Mason day 0.5 #REF! 1
Helper day 0.5 #REF! 1
Making necessary provision in wall / window LS
with Hardware
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
9.1.6 Supply, Fabrication and installation of 38 x
38 x 6 mm (1.5" x 1 1/2" x 1/4") M.S. angle
BLD-ELEC-9-1
a) Material
38 x 38 x 6 mm (1.5" x 1 /12" x 1/4") angle kg 10.5
iron frame, 13 M length (1 Mtr = 3.5 Kgs)
a) Material
ELEC-6.6.5 Supply of 1/6th H.P multispeed Fan Motor each 1 1590.00 1
for 1.0 / 1.5 / 2.0 T A.C.Unit.
b) Labour charges
Skilled Electrician day 0.5 Err:509 1
Helper day 0.5 Err:509 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
BLD-ELEC-9-2
a) Material
ELEC-6.6.8 Starting capacitor of 80 to 120 mfd. each 1 200.00 1
a) Material
ELEC-6.6.24 ----- capacity refrigerator cost each 1 3750.00 1
a) Material
ELEC-6.8.2 0.5 KVA Stabilizer each 1 810.00 1
b) Labour Charges
Semi skilled Electrician day 0.044 Err:509 1
Helper day 0.044 Err:509 1
Transportation Charges on Unit Cost 2%
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 23 jobs /
day
9.6.2 Supply and erecting fully automatic line
voltage stabilizer for operation on input
voltage 200 to 250V. rated for 1 KVA
maximum load and time delay model with
BLD-ELEC-9-6
a) Material
ELEC-6.8.3 1 KVA Stabilizer each 1 1805.00 1
b) Labour Charges
Semi skilled Electrician day 0.044 Err:509 1
Helper day 0.044 Err:509 1
Transportation Charges on Unit Cost 2%
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 23 jobs /
day
9.6.3 Supply and erecting fully automatic line
voltage stabilizer for operation on input
voltage 200 to 250V. rated for 3 KVA / 4 KVA
/ 5 KVA maximum load and time delay model
with Volt meter, selector switch, 6A / 16A
BLD-ELEC-9-6
a) Material
ELEC-6.8.5 3 KVA / 4 KVA / 5 KVA Stabilizer each 1 2250.00 1
b) Labour Charges
Skilled Electrician day 0.1 Err:509 1
Helper day 0.1 Err:509 1
Transportation Charges on Unit Cost 2%
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 10 jobs /
day
9.7 Fans
9.7.2A Supply and Fixing of 1200 mm (48") sweep
230V, A.C 50 Hz.Ceiling fan with 3 Blades
and double ball bearings with all standard
accessoriesand 400W Mini Modular Stepped
type Electronic Regulator with Cover Frame
BLD-ELEC-9-7-2
a) Material
(ELEC-5.1.1) 1200 mm (48") Ceiling Fan without each 1 1760.00
Regulator.of makes Crompton High Speed /
Bajaj Ultima / Havells Velocity / Usha Astra /
Orient Summer Pride.
ELEC-1.8.12 Supply and fixing of 400W Mini Modular each 1 240.00
Stepped type Electronic Regulator with
Cover Frame of makes Anchor / Gold
Medal / Million / Vimal / Maru / Milltec.
Transportation Charges on Unit Cost 1%
Supply and erecting fan hook of 12/15mm each 1 97.40
dia M.S. rod / bar grouted in RCC slab with
making the slab as origin
Supply and erecting 19/20mm steel tube each 1 28.85
down rod of one meter length
add labour charges for fixing
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
9.7.2B Supply and Fixing of 1400 mm (48") sweep
230V, A.C 50 Hz.Ceiling fan with 3 Blades
and double ball bearings with all standard
accessoriesand 400W Mini Modular Stepped
BLD-ELEC-9-7-2B
a) Material
ELEC-5.1.3 1400 mm (48") Ceiling Fan without each 1 1840.00
Regulator.of makes Crompton High Speed /
Bajaj Ultima / Havells Velocity / Usha Astra /
Orient Summer Pride.
ELEC-1.8.12 Supply and fixing of 400W Mini Modular each 1 240.00
Stepped type Electronic Regulator with
Cover Frame of makes Anchor / Gold
Medal / Million / Vimal / Maru / Milltec.
Transportation Charges on Unit Cost 1%
Supply and erecting fan hook of 12/15mm each 1 97.40
dia M.S. rod / bar grouted in RCC slab with
making the slab as origin
Supply and erecting 19/20mm steel tube each 1 28.85
down rod of one meter length
add labour charges for fixing
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
9.7.7 Supply and erecting wall mounting fan
BLD-ELEC-9-7
a) Material
ELEC-5.1.10 300mm (12") / 375 mm (15") H.D. Exhaust each 1 1350.00 1
Fan
Transportation Charges on Unit Cost 1%
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
BLD-ELEC-9-7
a) Material
(ELEC-1.8.14) Resistance type Regulator of makes M 1 0.00
Anchor / Gold Medal / Million /
b) Labour charges.
Semi skilled Electrician day 0.1 #REF! 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 10 jobs /
day
BLD-ELEC-9-7
9.7.34 helpers
Removing the ceiling fan and refixing after
overhauling and greasing the bearings and
replacement of wire leads etc complete
a) Material
ELEC-1.6.8 23/0060 twin core wire M 1 #REF! 1
b) Labour charges.
Removing and refixing of ceiling fan after
overhauling
Semi skilled Electrician day 0.166 #REF! 1
Helper day 0.166 #REF! 1
sundries LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 6 jobs /
day
9.7.35 Labour Charges
BLD-ELEC-9-7
b) Labour charges.
Skilled Electrician day 0.25 Err:509 1
Helper day 0.25 Err:509 1
Mason day 0.25 Err:509 1
Sundries such as Sand, Bolt, Nuts etc., LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note :1. Labour is Considered for 6 jobs /
day
2. Cost of louver shutter may be added if
required.
3. If hole is already made available, labour
charges of Mason shall be deleted.
10 WATER HEATERS
10.1.2 Supply and Transportation of stove
enamelled storage / pressure type vertical /
Horizontal water heater with copper tank
25 / 35 / 50 Ltrs. Capacity with non return
valve on inlet side and dead weight pressure
BLD-ELEC-10-1
a) Material
ELEC-5.2.2 25 / 35 / 50 Ltrs. Water Heater each 1 10900.00 1
ELEC-9.1.5 50 / 100 mm (2" / 4") long bolt and nut with each 4 13.00 1
washers
ELEC-9.1.48 Towards wooden plugs, cement etc., LS 6.60
b) Labour charges.
Skilled Electrician day 0.25 Err:509 1
Helper day 0.5 Err:509 1
Semi skilled Mason day 0.25 Err:509 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 4 jobs /
day
10.2 INSTANT WATER HEATERS
10.2.1 Supply and erecting ISI Mark 3KW Instant
Water heater with multiple safety system,
rust free ABS plastic body, 230V, 50Hz..,
A.C. supply with inlet and outlet connections
BLD-ELEC-10-2
a) Material
3KW Instant Water Heater each 1
Transportation Charges on Unit Cost 2%
ELEC-5.3.4 Hose pipe PVC/ Nylon each 2 #REF!
ELEC-8.1.54 T.W getting Bolt / Nuts, Cement, Sand etc. LS #REF!
b) Labour charges.
Skilled Electrician day 0.25 Err:509 1
Helper day 0.25 Err:509 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 4 jobs /
day
10.4 REPAIRS TO WATER HEATERS.
BLD-ELEC-10-3
b) Labour charges.
Skilled Electrician day 0.2 Err:509 1
Sundries and rounding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 5 jobs /
day
BLD-ELEC-10-3
a) Material
ELEC-5.9.1 0.5HP, 230V, single phase A.C 50Hz. 1440 each 1 5145.00 1
RPM with all accessories. Including all taxes
a) Material
ELEC-5.9.1 1 HP, 230V, single phase A.C 50Hz. 1440 each 1 7455.00 1
RPM with all accessories. Including all taxes
a) Material
ELEC-5.9.1 1.5 HP, 230V, single phase A.C 50Hz. 1440 each 1 9975.00 1
RPM with all accessories. Including all taxes
a) Material
ELEC-5.9.1 2 HP, 230V, single phase A.C 50Hz. 1440 each 1 14700.00 1
RPM with all accessories. Including all taxes
a) Material
ELEC-5.9.1 3 phase, 3 HP, 415V, 50Hz., 2880 RPM each 1 19950.00 1
centrifugal Water pump with all taxes
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 1 Err:509 1
Helper day 1 Err:509 1
Plumber day 1 Err:509 1
Sundries and rounding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.1.6 Supply and erecting approved make
centrifugal water pump with impeller, priming
funnel cork, companion metallic flanges, with
bolts and nuts and mounted on a common
shaft of high efficient squirrel cage Induction
BLD-ELEC-11-1
a) Material
3 phase, 7.5 HP, 415V, 50Hz., 2880 RPM each 1
centrifugal mono block pump with all taxes
a) Material
3 phase, 10 HP, 415V, 50Hz., 2880 RPM each 1 0.00
centrifugal mono block pump with all taxes
a) Material
3 phase, 15 HP, 415V, 50Hz., 2880 RPM each 1 0.00
centrifugal Water pump with all taxes
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 1 Err:509 1
Helper day 3 Err:509 1
Plumber day 1 Err:509 1
Sundries and rounding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.2 EJECTO PUMPS
11.2.1 Supply and erecting Ejecto type water pump
single phase, 0.5HP single stage with brass
venturi and having suction pipe 40mm dia,
BLD-ELEC-11-2
a) Material
0.5 HP, single phase, 230V, 50Hz. Ejecto each 1
type pump set. Including all taxes
M.S clamps suitable for 40mmx32mm pipes each 2
with nuts and bolts.
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Electrician day 0.5 Err:509 1
Helper day 1 Err:509 1
Fitter day 0.5 Err:509 1
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
11.2.2 Supply and erecting Ejecto type water pump
single phase, 1.0HP single stage with brass
venturi and having suction pipe 40mm dia,
BLD-ELEC-11-2
a) Material
1.0 HP, single phase, 230V, 50Hz. Ejecto each 1
type pump set. Including all taxes
M.S clamps suitable for 40mmx32mm pipes each 2
with nuts and bolts.
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Electrician day 0.5 Err:509 1
Helper day 1 Err:509 1
Fitter day 0.5 Err:509 1
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
11.2.3 Supply and erecting Ejecto type water pump
single phase, 1.5HP single stage with brass
venturi and having suction pipe 40mm dia,
BLD-ELEC-11-2
a) Material
1.5 HP, single phase, 230V, 50Hz. Ejecto each 1
type pump set. Including all taxes
M.S clamps suitable for 40mmx32mm pipes each 2
with nuts and bolts.
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Electrician day 0.5 Err:509 1
Helper day 1 Err:509 1
Fitter day 0.5 Err:509 1
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
11.2.4 Supply and erecting Ejecto type water pump
single phase, 2.0HP single stage with brass
venturi and having suction pipe 40mm dia,
BLD-ELEC-11-2
a) Material
2.0 HP, single phase, 230V, 50Hz. Ejecto each 1
type pump set. Including all taxes
M.S clamps suitable for 40mmx32mm pipes each 2
with nuts and bolts.
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Electrician day 0.5 #REF! 1
Helper day 1 #REF! 1
Fitter day 0.5 #REF! 1
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
11.2.6 Supply and erecting Ejecto type water pump
3 phase, 3 HP single stage with brass
BLD-ELEC-11-2
a) Material
3.0 HP, single phase, 230V, 50Hz. Ejecto each 1
type pump set. Including all taxes
M.S clamps suitable for 40mmx32mm pipes each 2
with nuts and bolts.
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Electrician day 0.5 #REF! 1
Helper day 1 #REF! 1
Fitter day 0.5 #REF! 1
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
11.2.7 Supply and erecting Ejecto type water pump
3 phase, 5 HP single stage with brass
BLD-ELEC-11-2
a) Material
3Ph, 5 HP 415V, 50Hz. Ejecto pump set with each 1
all taxes
M.S clamps suitable for Air and delivery each 2
pipes with nuts and bolts.
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 0.5 #REF! 1
Helper day 1.5 #REF! 1
Plumber day 0.5 #REF! 1
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
Bldngs_Elec-11-3
11.3 SUBMERSIBLE PUMPS (Bore well type)
a) Material
1HP, Single Phase 18 stage submerisible each 1
pump set including all taxes
Special M.S. clamps with bolts and nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 0.5 #REF! 1
Helper day 1 #REF! 1
Plumber day 0.5 #REF! 1
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
11.3.1 (b) Supply and erecting, ISI mark submersible
1.5 HP, Single Phase 20 stages pumpset
suitable for 106 / 156mm dia borewell with
high quality water resistant and dynamically
balanced bronze impeller with stainless steel
shaft sleeves, pump coupling and pivot of
BLD-ELEC-11-3
a) Material
1.5HP, Single Phase 20 stage submerisible each 1
pump set including all taxes
Special M.S. clamps with bolts and nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 0.5 #REF! 1
Helper day 1 #REF! 1
Plumber day 0.5 #REF! 1
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
11.3.1 (c) Supply and erecting, ISI mark submersible
2.0 HP, Single Phase 30 stages pumpset
suitable for 106 / 156mm dia borewell with
high quality water resistant and dynamically
balanced bronze impeller with stainless steel
shaft sleeves, pump coupling and pivot of
BLD-ELEC-11-3
a) Material
2HP, Single Phase 30 stage submerisible each 1
pump set including all taxes
Special M.S. clamps with bolts and nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 0.5 #REF! 1
Helper day 1 #REF! 1
Plumber day 0.5 #REF! 1
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
11.3.2 Supply and erecting, ISI mark submersible
2.0 HP, 3 Phase, 3 stages pumpset suitable
for 156mm dia borewell with high quality
water resistant and dynamically balanced
bronze impeller with stainless steel shaft
sleeves, pump coupling and pivot of 3 phase
BLD-ELEC-11-3
a) Material
2HP, 3 Ph 3 stage submerisible pump set each 1
including all taxes
Special M.S. clamps with bolts and nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 1 #REF! 1
Helper day 2 #REF! 1
Plumber day 1 #REF! 1
Hire charges of tripod with winch 50% of
Labour charges
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.3.3 Supply and erecting, ISI mark submersible
3.0 HP,3 Phase, 4 stages pumpset suitable
for 156mm dia borewell with high quality
wear resistance and dynamically balanced
bronze impeller with stainless steel shaft
sleeves, pump coupling and pivot of 3 phase
BLD-ELEC-11-3
a) Material
3HP, 3 Ph 4 stage submerisible pump set. each 1
Including all taxes
Special M.S. clamps with bolts and nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 1 #REF! 1
Helper day 2 #REF! 1
Plumber day 1 #REF! 1
Hire charges of tripod with winch 50% of
Labour charges
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.3.4 Supply and erecting, ISI mark submersible 3
HP, 3 Phase, 6 stages pumpset suitable for
156mm dia borewell with high quality wear
resistance and dynamically balanced bronze
impeller with stainless steel shaft sleeves,
pump coupling and pivot of 3 phase 415V ,
BLD-ELEC-11-3
a) Material
3HP, 3 Ph 6 stage submerisible pump set. each 1
Including all taxes
Special M.S. clamps with bolts and nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 1 #REF! 1
Helper day 2 #REF! 1
Plumber day 1 #REF! 1
Hire charges of tripod with winch 50% of
Labour charges
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.3.5 Supply and erecting, ISI mark submersible 3
HP, 3 Phase, 8 stages pumpset suitable for
156mm dia borewell with high quality wear
resistance and dynamically balanced bronze
impeller with stainless steel shaft sleeves,
pump coupling and pivot of 3 phase 415V ,
BLD-ELEC-11-3
a) Material
3HP, 3 Ph 6 stage submerisible pump set. each 1
Including all taxes
Special M.S. clamps with bolts and nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 1 #REF! 1
Helper day 2 #REF! 1
Plumber day 1 #REF! 1
Hire charges of tripod with winch 50% of
Labour charges
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.3.6 Supply and erecting, ISI mark submersible 3
HP, 3 Phase, 9 stages pumpset suitable for
156mm dia borewell with high quality wear
resistance and dynamically balanced bronze
impeller with stainless steel shaft sleeves,
pump coupling and pivot of 3 phase 415V ,
BLD-ELEC-11-3
a) Material
3HP, 3 Ph 6 stage submerisible pump set each 1
Including all taxes
Special M.S. clamps with bolts and nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 1 #REF! 1
Helper day 2 #REF! 1
Plumber day 1 #REF! 1
Hire charges of tripod with winch 50% of
Labour charges
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.3.7 Supply and erecting, ISI mark submersible 4
HP, 3 Phase, 6 stages pumpset suitable for
156mm dia borewell with high quality wear
resistance and dynamically balanced bronze
impeller with stainless steel shaft sleeves,
pump coupling and pivot of 3 phase 415V,
BLD-ELEC-11-3
a) Material
4HP, 3 Ph 6 stage submerisible pump set each 1
including all taxes
Special M.S. clamps with bolts and nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 1 #REF! 1
Helper day 2 #REF! 1
Plumber day 1 #REF! 1
Hire charges of tripod with winch 50% of
Labour charges
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.3.8 Supply and erecting, ISI mark submersible 4
HP, 3 Phase, 12 stages pumpset suitable for
156mm dia borewell with high quality wear
resistance and dynamically balanced bronze
impeller with stainless steel shaft sleeves,
pump coupling and pivot of 3 phase 415V,
BLD-ELEC-11-3
a) Material
4HP, 3 Ph 12 stages submerisible pump set each 1
Including all taxes
Special M.S. clamps with bolts and nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 1 #REF! 1
Helper day 2 #REF! 1
Plumber day 1 #REF! 1
Hire charges of tripod with winch 50% of
Labour charges
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.3.10 Supply and erecting, ISI mark submersible 5
HP, 3 Phase, 8 stages pumpset suitable for
156mm dia borewell with high quality wear
resistance and dynamically balanced bronze
impeller with stainless steel shaft sleeves,
pump coupling and pivot of 3 phase 415V,
BLD-ELEC-11-3
a) Material
Cost of 3 Ph, 5 HP, 8 St. S.M pumpset each 1
Special Clamps with Bolts & Nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 2 #REF! 1
Helper day 3 #REF! 1
Plumber day 1 #REF! 1
Hire charges of tripod with winch 50% of
Labour charges
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.3.11 Supply and erecting, ISI mark submersible 5
HP, 3 Phase, 13 stages pumpset suitable for
156mm dia borewell with high quality wear
resistance and dynamically balanced bronze
impeller with stainless steel shaft sleeves,
pump coupling and pivot of 3 phase 415V ,
BLD-ELEC-11-3
a) Material
Cost of 3 Ph, 5 HP, 8 St. S.M pumpset each 1
Special Clamps with Bolts & Nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 2 #REF! 1
Helper day 3 #REF! 1
Plumber day 1 #REF! 1
Hire charges of tripod with winch 50% of
Labour charges
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.3.12 Supply and erecting, ISI mark submersible
7.5 HP,3 Phase, 6 stages pumpset suitable
for 156mm dia borewell with high quality
wear resistance and dynamically balanced
bronze impeller with stainless steel shaft
sleeves, pump coupling and pivot of 3 phase
BLD-ELEC-11-3
a) Material
3 Ph, 7.5 HP, 6 St. S.M pumpset each 1
Special Clamps with Bolts & Nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 2 #REF! 1
Helper day 3 #REF! 1
Plumber day 1 #REF! 1
Hire charges of tripod with winch 50% of
Labour charges
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.3.13 Supply and erecting, ISI mark submersible
7.5 HP, 3 Phase, 12 stages pumpset
suitable for 156mm dia borewell with high
quality wear resistance and dynamically
balanced bronze impeller with stainless steel
shaft sleeves, pump coupling and pivot of 3
BLD-ELEC-11-3
a) Material
3 Ph, 7.5 HP, 12 St. S.M pumpset each 1
Special Clamps with Bolts & Nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 2 #REF! 1
Helper day 3 #REF! 1
Plumber day 1 #REF! 1
Hire charges of tripod with winch 50% of
Labour charges
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.3.15 Supply and erecting, ISI mark submersible
10 HP,3 Phase, 12 stages pumpset suitable
for 156mm dia borewell with high quality
wear resistance and dynamically balanced
bronze impeller with stainless steel shaft
sleeves, pump coupling and pivot of 3 phase
BLD-ELEC-11-3
a) Material
Cost of 3 Ph,10 H.P 12St. S.M pumpset each 1
Special Clamps with Bolts & Nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 2 #REF! 1
Helper day 3 #REF! 1
Plumber day 1 #REF! 1
Hire charges of tripod with winch 50% of
Labour charges
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.3.16 Supply and erecting, ISI mark submersible
10 HP,3 Phase,16 stages pumpset suitable
for 156mm dia borewell with high quality
wear resistance and dynamically balanced
bronze impeller with stainless steel shaft
sleeves, pump coupling and pivot of 3 phase
BLD-ELEC-11-3
a) Material
Cost of 3 Ph,10 H.P 16 St. S.M pumpset each 1
Special Clamps with Bolts & Nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 2 #REF! 1
Helper day 3 #REF! 1
Plumber day 1 #REF! 1
Hire charges of tripod with winch 50% of
Labour charges
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.3.17 Supply and erecting, ISI mark submersible
15 HP, 3 Phase, 15 stages pumpset suitable
for 156mm dia borewell with high quality
wear resistance and dynamically balanced
bronze impeller with stainless steel shaft
sleeves, pump coupling and pivot of 3 phase
BLD-ELEC-11-3
a) Material
Cost of 3 Ph,15 H.P 15 St. S.M pumpset each 1
Special Clamps with Bolts & Nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 2 #REF! 1
Helper day 4 #REF! 1
Plumber day 1 #REF! 1
Hire charges of tripod with winch 50% of
Labour charges
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.4 SUB MERSIBLE PUMPS (OPEN WELL)
11.4.1 Supply and erecting ISI make submersible
pumpset suitable for erection in open well
with water resistant dynamically balanced
impeller with stainless steel shaft sleeves,
pump coupling and pivot with squirrel cage
Induction Motor of 3 phase, 415V, 50Hz..,
A.C.Supply, heavy copper windings with
BLD-ELEC-11-4
a) Material
ELEC-5.7.5 3 Ph, 3HP Submersible motor each 1 17850.00 1
a) Material
ELEC-5.8.4 3 Ph, 5HP Submersible motor each 1 21000.00 1
a) Material
ELEC-5.8.6 3 Ph, 7.5HP Submersible motor each 1 25000.00 1
a) Material
ELEC-5.8.7 3 Ph, 10 HP Submersible motor each 1 33600.00 1
a) Material
Rate as per Civil SSR, since it is a Civil
item.
11.5.2 Supplying and erecting D.O.L Starter 250V,
Single phase, 50Hz. With SS enclouser
comprising of contactor with bi-metalic relay
with necessary push buttons, transportation
and all labour charges etc., complete .
a) Material
ELEC-5.4.1 D.O.L. Starter 1Ph, 250V each 1 780.00 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 3 jobs /
day
11.5.2(a) Supplying and erecting D.O.L Starter 400V,
BLD-ELEC-11-5
a) Material
ELEC-5.4.2 D.O.L. Starter 3Ph, 415V upto 3/4/5HP each 1 1450.00 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 3 jobs /
day
11.5.3 Supply and fixing of approved make semi
automatic hand operated 3ph, 415V star -
BLD-ELEC-11-5
a) Material
Semi automatic 3Ph, Induction motor with each 1
enclosure (Including of all taxes with
Transportation)
b) Labour charges for fixing and giving
connections.
Skilled Electrician day 0.5 #REF! 1
Helper day 0.5 #REF! 1
Sunries such, as bolts, nuts and rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
11.5.4 Supply and fixing of approved make semi
automatic hand operated 3ph, 415V star -
BLD-ELEC-11-5
a) Material
Deduct
Cost of semi Automatic star - Delta starter each 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
11.5.5 Supply and fixing of approved make
automatic operated 3ph, 415V star - delta
BLD-ELEC-11-5
a) Material
Cost of semi Automatic star - Delta starter each 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
11.5.6 Supply and fixing of approved make semi
automatic hand operated 3ph, 415V star -
BLD-ELEC-11-5
a) Material
Cost of semi Automatic star - Delta starter each 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
11.5.7 Supply and erecting directly operated single
BLD-ELEC-11-5
a) Material
Single phase parameter upto 45A (Including each 1
all taxes and Transportation)
b) Labour charges.
Skilled Electrician day 0.2 #REF! 1
Helper day 0.2 #REF! 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 5 jobs /
day
12 Bus Bars
For details, Please see after Chapter 20.
a) Material
ELEC-7.1.1 Cost of swaged pole each 1 No 71.00 1
Bldngs_Elec-13-2
13.2 Garden Posts
13.2.1 Fabrication and Supply of M.S. Poles for
garden posts with 'B' class 4mtrs long
BLD-ELEC-13-2
a) Material
4Mtrs 'B' Class M.S. pipe of 60.25mm dia Kg 24.8
with base plate and suitable pole cap
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
13.2.2 Fabrication and Supply of M.S. Poles for
garden posts with 'B' class 6 mtrs long
BLD-ELEC-13-2
a) Material
ELEC-7.1.2 6Mtrs 'B' Class M.S. pipe of 60.25mm dia Kg 37.2 65.00 1
with base plate and suitable pole cap -
Sub total
add for over heads @ 13.6%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
13.3 Brackets
13.3.1 Supply and fixing of 50mm dia 0.5 mtrs
BLD-ELEC-13-3
a) Material
Pit excavation 156 Cmx 60Cmx60cm.(Civil S cum 0.54
C.C.work for pit 1:3:6 (Civil SSR) cum 0.54
Couping 1:2:4 (Civil SSR) cum 0.054
Painting with red oxid and enamel paint. M 6.2
Coil earthing each 1
b) Labour charges
Skilled Electrician day 0.33 #REF! 1
Helper day 2.67 #REF! 1
Mason day 0.33 #REF! 1
Hire charges for Spl.T&P 40% on labour cost
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 3 jobs /
day
13.4.2(a) Erection charges for 9 mtrs to 11 mtrs long
swaged pole including excavation of pit, coil
BLD-ELEC-13-4
a) Material
Pit excavation 156 Cmx 60Cmx60cm.(Civil S cum 0.72
C.C.work for pit 1:3:6 (Civil SSR) cum 0.72
Couping 1:2:4 (Civil SSR) cum 0.054
Painting with red oxid and enamel paint. M 8.35
Coil earthing each 1
b) Labour charges
Skilled Electrician day 0.33 #REF! 1
Helper day 2.67 #REF! 1
Mason day 0.33 #REF! 1
Hire charges for Spl.T&P 40% on labour cost
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 3 jobs /
day
13.4.2(b) Erection charges for 12 Mts to 14Mts long
swaged pole including excavation of pit, coil
BLD-ELEC-13-4
a) Material
Pit excavation 2.0x1.0x1.0Mtr cum 2
1:3:6 CC Work cum 2
couping 1:2:4 cum 0.054
Painting with red oxid and alluminum paint. M 12
a) Material
Pit excavation 2.30x1.0x1.0Mtr cum 2.3
1:3:6 CC Work cum 2.3
couping 1:2:4 cum 0.054
Painting with red oxid and alluminum paint. M 14
a) Material
Painting with red oxid and enamel paint. M 6.2
Coil earthing each 1
3 Nos, 25 x 6 mm MS Special Clamps of 1 M Kg 3.54
Length each @ 1.18 Kg
VCC M 15 Concrete 0.5 x 0.3 x 0.9 cum 0.135
b) Labour charges
Skilled Electrician day 0.33 #REF! 1
Helper day 2.67 #REF! 1
Mason day 0.33 #REF! 1
Fanrication of clamps kgs 3.54
Hire charges for Spl.T&P 20% on labour cost
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 3 jobs /
day
13.4.5 Erection charges for 4 Mtrs. Long MS / GI
BLD-ELEC-13-4
a) Material
Pit excavation (0.4x0.4x1.0 mtr) cum 0.16
Painting with red oxide and enamel paint. M 2.5
1:3:6 C.C work. cum 0.16
b) Labour charges
Mason day 0.2 #REF! 1
Helper day 0.4 #REF! 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 5 jobs /
day
13.4.6 Erection charges for 6Mtrs. Long MS / GI
BLD-ELEC-13-4
a) Material
9.1.50 Pit excavation ( 0.45x0.45x1.25) cum 0.25 220.00 1
1: 3: 6 C.C. work cum 0.25 4420.33 1
Painting with red oxide and enamel paint M 4.75 0.20 63.75 1
b) Labour charges
Mason day 0.2 #REF! 1
Helper day 0.4 #REF! 1
Sub total
add for over heads @ 13.6%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 5 jobs /
day
13.4.7 Fabrication, supply and fixing of luminaire
carriage, made with 50mm dia M.S. 'B' class
pipe, moulded to 6 feet dia ring wheel, and
40mm dia M.S support pieces on 4 sides
inside the wheel and necessary size of M.S
BLD-ELEC-13-4
a) Material
300x260x140mm 16 guage CRCA box sqm 0.35 13500.97
finished of item (as per 14.1.2)
MCB No 2.00 512.00
Sundries as rounding off
Sub total
add for over heads @ 0%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
13.5.2 Supply and fixing of 300mm x 180mm x
140mm No.16 gauge CRCA sheet box with
hinged door and locking arrangements and
BLD-ELEC-13-5
a) Material
300x180x140mm 16 guage CRCA sheet box as sqm 0.29 4030.00 1
Sundries as rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
13.5.3 Supply and fixing of 1 No.10A SP MCB in
BLD-ELEC-13-5 existing M.S. box with Din channel, 4way
63A connector including cost & conveyance
of all materials and labour charges etc.,
complete.
a) Material
(ELEC-2.9.2) 10A SP MCB each 1 #REF! 1
a) Material
(ELEC-2.9.2) 10A SP MCB each 2 #REF! 1
Transportation charges 2%
Fabrication including cutting, bending, 30%
drilling and Dust proof arrnagments etc.,
Cleaning of cubicals in seven tank process 40%
a) Material
ELEC-7.12.5 Frequency meter Analog / Degital inclusive each 1 4556.00 1
of all Taxes.
b) Labour charges for fixing and
connections.
Skilled Electrician day 0.2 Err:509 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
14.2.4 Supply and erection of power factor meter, 3
BLD-ELEC-14-2
a) Material
ELEC-7.12.7 L.T. 3 Ph. Multifunction energy meter each 1 10023.00 1
Analog / Degital inclusive of all Taxes.-
b) Labour charges for fixing and
connections.
Skilled Electrician day 0.33 Err:509 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 3 jobs /
day
BLD-ELEC-14-2
a) Material
ELEC-7.12.8 Selector switch for Ammeter / Voltmeter. each 1 175.00 1
day
14.2.7 Supply and erection of LED indicator lamps
on the existing box / panel board.
a) Material
ELEC-7.12.9 LED indicator lamp Analog each 1 135.00 1
a) Material
ELEC-7.12.11 cost of single phase energy meter - each 1 1050.00 1
a) Material
ELEC-7.12.12 Cost of three phase energy meter each 1 3037.00 1
a) Material
Brass cable gland suitabtle for 4core 16 each 1 0
Sq.mm / 3.5 core 25 Sq.mm armoured cable
a) Material
Brass cable gland suitabtle for 3.5core 35 each 1 0
Sq.mm / 3 core 50 Sq.mm armoured cable
day
(b) 25 Sq.mm to 50 Sq.mm
a) Material
ELEC-4.5.2 Epoxy straight joint 25 to 50 Sq.mm with each 1 1545.00 1
accessories
b) Labour charges
Semi Skilled Electrician day 0.5 Err:509 1
Helper day 0.5 Err:509 1
Sundries
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
BLD-ELEC-15-5 day
(c ) 70 Sq.mm to 95 Sq.mm
a) Material
ELEC-4.4.18 Epoxy straight joint 70 to 95 Sq.mm with each 1 #REF! 1
accessories
b) Labour charges
Semi Skilled Electrician day 0.5 Err:509 1
Helper day 0.5 Err:509 1
Sundries
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
BLD-ELEC-15-5
day
(d) 75Sq.mm to 185 Sq.mm
a) Material
ELEC-4.4.18 Epoxy straight joint 120 to 185 Sq.mm with each 1 2230.00 1
accessories
b) Labour charges
Semi Skilled Electrician day 0.5 Err:509 1
Helper day 0.5 Err:509 1
Sundries
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs / day
BLD-ELEC-15-5
b) Labour charges
Skilled Electrician day 1 Err:509 1
Helper day 1 Err:509 1
Sundries
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
BLD-ELEC-15-5
b) Labour charges
Skilled Electrician day 1 Err:509 1
Helper day 1 Err:509 1
Sundries
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Bldngs_Elec-15-4
15.6 Labour Charges Laying of Cable including cost of all Materials other than Cable
15.6.1 Earth work excavation of Trench in hard ground soil, laying of U.G cables upto 50 Sq,mm on sand cushio
BLD-ELEC-15-5
a) Material
ELEC-9.1.50 Excavation of earth 100 x 0.3 X 0.9 m cum 27 220.00 1
15.6.2 Earth work excavation of Trench in hard ground soil, laying of U.G cables from 70 sqmm to 400 Sq,mm o
BLD-ELEC-15-5
a) Material
ELEC-8.1.56 Excavation of earth 100 x 0.3 X 0.9 m cum 27 220.00 1
ELEC-8.1.58 Cost of bricks (Civil SSR) 1000 0.92 3819.00 1000
Nos
ELEC-8.1.57 Cost of sand (Civil SSR) cum 6 594.00 1
ELEC-8.1.54 Cement (Civil SSR) Kg 25 6.60 1
ELEC-8.1.30 Cost of cable route indicator each 12 90.00 1
Transportation charges of bricks and sand LS
b) Labour charges for laying cable.
Man Mazdoor for spreading the sand and each 2.5 510.00 1
back filling the excavated soil.
Skilled Electrician day 1.6 648.00 1
Helper day 3.3 540.00 1
Man Mazdoor for concreting and embedding day 2 510.00 1
of cable way indicators
Sundires and Rounding off
Sub total
add for over heads @ 13.62%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per 60mts
Rate per 1 Rmt
Note :1. Labour Charges Considered for 60 Mts / day
2. Cables shall be at a depth of not less than 600 mm in a trench. Sand filling shall be provi
bottom of trench
3. Only the cost ofbefore
cableslaying
may bethe cable.
added forBricks shall
finished be provided on either side of the laid ca
item.
15.6.3 Labour charges for run of U.G cable on
wall / existing pipe with necessary fixing
BLD-ELEC-15-5
a) Material
Wooden separators each 200 1
saddles of required size 100 nos 2 1
12mm screws 100 nos 4 1
ELEC-8.1.41 No.10 SWG GI wire kg 7 #REF! 1
b) Labour charges
Skilled Electrician day 1 Err:509 1
Helper day 4 Err:509 1
Sundires such as Cement, Sand etc.,
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour Charges Considered for
100 Mts / day
15.6.4 Supply and laying of one number double
walled corrugated (DWC) HDPE pipe of
following sizes having corrugation on the
outer wall and plain surface inner wall
BLD-ELEC-15-5
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre
Bldngs_Elec-16
16 TEMPORARY ILLUMINATION
BLD-ELEC-16.1
a) Material
20KVA Air Cooled, 3Ph, 451V, 50Hz., D.G.Set. each 1 0
a) Material
3Ph, 415V, 50Hz., 25 KVA Air Cooled each 1
D.G.Set
Erection and commissioning charges @ 10%
10% of the cost of the set.
Transportation at 2% on unit cost 2%
Sundires and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
17.1.3 (d) Supply, Transportation , erection of 3 Ph Air-
BLD-ELEC-16.1
a) Material
ELEC-11.1.1c 40KVA, 3Ph,415V,D.G.Set each 1 617400.00 1
Erection and commissioning charges @ 10%
10% of the cost of the set.
Transportation at 2% on unit cost 2%
Sundires and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
17.1.3 (f) Supply, Transportation, erection of 3 Ph Air-
BLD-ELEC-16.1
a) Material
ELEC-11.1.2a 63KVA, 3Ph, 415V, D.G Set each 1 810000.00 1
Erection and commissioning charges @ 10% of the cost of the
10%
set.
Transportation at 2% 2%
Sundires and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
17.1.3 (h) Supply, Transportation , erection of 3 Phase
BLD-ELEC-16.1
a) Material
ELEC-10.1.4 63KVA, 3Ph, 415V, D.G Set each 1 #REF! 1
Cost of Acoustic enclosure each 1
Erection and commissioning charges :
the cost of the DG set. 10%
cost of acoustic enclosure 5%
Transportation at 2% 2%
Sundires and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
17.1.3 (i) Supply, Transportation , erection of 3 Phase
BLD-ELEC-16.1
a) Material
ELEC-11.1.2b 125KVA, Water Cooled, 3Ph, 415V D.G.Set. each 1 1100000.00 1
a) Material
630A, 415V Fixed type 3 pole ACB each 1
Shunt release each 1
U/V release each 1
Earth fault release each 1
Transportation @ 2% on Unit Cost 2%
b) Labour charges for installation @ 5% 5%
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
17.3.8 Supply and errecting Air circuit Breaker
(ACB) manually operated non drawout type
with 6 way secondary isolating contacts
necessary micro switches for over load and
short circuit indicator, door interlocking,
BLD-ELEC-16.3
a) Material
800A, 415V Fixed type 3 pole ACB each 1
Shunt release Coil. each 1
U/V release Coil. each 1
Earth fault release each 1
Transportation @ 2% on Unit Cost 2%
b) Labour charges for installation @ 5% 5%
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
17.3.9 Supply and errecting Air circuit Breaker
(ACB) manually operated non drawout type
with 6 way secondary isolating contacts
necessary micro switches for over load and
short circuit indicator, door interlocking,
BLD-ELEC-16.3
a) Material
1000A, 415V, Fixed type 3 pole ACB. each 1
Shunt release each 1
U/V release each 1
Earth fault release each 1
Transportation @ 2% on Unit Cost 2%
b) Labour charges for installation @ 5% 5%
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Bldngs_Elec-17-4
17.4 SUB - STATION EQUIPMENT
BLD-ELEC-16.4
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
BLD-ELEC-16.4
a) Material
ELEC-7.13.4 Transformer Oil having Dielectric strength of L 1 500.00 1
50 KV
Sundries and rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Lt
17.4.7 Providing floor mounting stand for keeping
BLD-ELEC-16.4
a) Material
1500mm length, 900mm height Floor kg 17.5
mounting stand fabricated with 40x40x6mm
angle iron welded with 4 Nos Hooks. (1Mtr =
3.5Kg) (5x3.5Kgs = 17.5Kgs)
a) Material
50x50x6mm Angle Iron (1 Mt. = 4.37 Kg) 4.8 kg 20.97
m Length
25x6mm M.S Flat (1 Mt. 1.18 Kg) 3.6 M kg 4.25
length
Chain link Mesh (Civil SSR) sqm 2.4
Fabrication of Frame with angles, Flat and kg 25.22
chain link mesh
C.C.Work M 15 using 20 mm metal (15 x 15 cum 0.018
x 40) x 2 As per Civil SSR
Painting with one coat of red oxide and two sqm 5.88
coat of alluminium paint.
Sundires and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
17.4.11 Supply and erecting 50x50x6mm angle iron
as corner support to be fixed away from the
BLD-ELEC-16.4
a) Material
50x50x6mm Angle. (1 mt. 4.37 Kg) 2m kg 8.74
Length
C.C.Work M 15 using 20 mm metal (15 x 15 cum 0.018
x 40) x 2 As per Civil SSR
Painting with one coat of red oxide and two 10%
coats of Aluminium paint (on cost of Item 1)
a) Material
38.1mm dia B Class G.I pipe. RM 14
(1.85 x 4 Nos + 1.5x 4Nos = 13.4 Mt or say
14 Mtrs.) ( civil SSR)
25x6mm M.S. Flat (1.18 Kgs / Mt) 17 M kg 20.06
length
1000x50mm Channle (1mt = 8.74 Kg) 5 M kg 43.7
length
4 Nos x 2.38M Length, 40 x 40 x 6 mm M.S. kg 33.32
Angle Iron ( 1 Mtr = 3.5 Kg) 9.52 M length
On site.
a) Material
Labour charges for filterations at site
Rate per Each
17.5.1 (b) Filteration of transformer oil as per ISS for
removal of moisture, carbon slurry etc. by
means of circulating oil through vaccum
pump from heating elements and filters to
withstand the dielectric strength of the oil
above 40KV beyond one minute tested in oil
testing Kit.
At Factory.
a) Material
Labour charges for filterations at site
Rate per Each
17.5.3 Carryout routine maintenance, servicing
and testing of 630A to 1000A L.T.ACB by
BLD-ELEC-16.5
a) Material
ELEC-6.4.1 Removing the existing ACB and servicing #REF!
and testing of 630A to 1000A L.T.ACB.
Clearing of fixed contacts, moving contacts
and arcchutes
Refix the ACB inposition and testing and
commissioning charges.
b) Labour charges for entire job
Skilled Electrician day 3 #REF! 1
Semi Skilled Electrician day 3 #REF! 1
Helper day 6 #REF! 1
Sundries and Rounding
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note :Job requires 3 days. Keeping this labour
17.5.4 arrived.
Carryout routine maintenance and servicing
of LT.Cubical panel board having
approximately 15 to 22 Nos of switches by
cleaning with power blower and servicing the
BLD-ELEC-16.5
a) Material
ELEC-6.4.2 Removing all the doors of switches, busbar #REF! 1
chamber and back doors.
Clearing by using power blower.
Tightening all the terminations and cleaning
and servicing the contacts of switches.
a) Material
ELEC-7.15.1 Cost of 11 KV 5KA metal oxide lighting each 1 1500.00 1
arrester.
b) Labour charges for erection.
Skilled Electrician day 0.33 648.00 1
Helper day 0.33 540.00 1
Sundries
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is considered for 3 jobs / day
BLD-ELEC-16.6
a) Material
Err:509 Lightning protective system with all standard each 1 Err:509 1
accessories such as metallic globe, finials
etc.,
25.4 mm B Class GI Pipe, ISI Mark M 3
b) Labour charges
i) for fixing the System on G.I pipe.
ii) for fixing on top of the building with C.C
work / Clamping arrangement.
Skilled Electrician day 1 648.00 1
Helper day 1 540.00 1
Sundries and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
17.6.10 Supply and erecting approved made 11KV,
BLD-ELEC-16.6 400A A.B switch with all standard
accessories etc., complelte with cost and
conveyance of all materials and labour
charges.
a) Material
ELEC-7.15.6 Cost of 11KV, 400A A.B switch wth all each 1 7000.00 1
standard accessories.
b) Labour charges for erection.
Skilled Electrician day 1 648.00 1
Semi Skilled Electrician day 1 540.00 1
Helper day 1 540.00 1
Sundries and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
17.6.11 Supply and erecting approved made 11KV,
BLD-ELEC-16.6
a) Material
ELEC-7.15.9 Cost of 11KV, H.G. fuse set wth all standard each 1 4000.00 1
accessories.
b) Labour charges for erection.
Skilled Electrician day 1 648.00 1
Helper day 1 540.00 1
Sundries and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
17.6.14 Supply and erecting of bank of metalised
polypropylene condensors with the standard
capacities of 2,3,5,7,10,12.5 and 15 KVAR
BLD-ELEC-16.6
a) Material
ELEC-7.13.33 Cost of MPP capacitor operation on 3 Ph. Kvar 1 350.00 1
415V.
b) Labour charges for erection.
Skilled Electrician day 0.04 648.00 1
Helper day 0.08 540.00 1
Sundries and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Kvar
Note : Labour considered for 25 jobs / day
17.6.15 Supply and erecting of bank of mixdielectric
condensors with the standard capacities of
2,3,5,7,10,12.5 and 15 KVAR units for PF
BLD-ELEC-16.6
a) Material
Cost of of mixed Dielectric capacitor Kvar 1
operation on 3 Ph. 415V.
b) Labour charges for erection.
Skilled Electrician day 0.04 648.00 1
Helper day 0.08 540.00 1
Sundries and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Kvar
Note : Labour considered for 25 jobs / day
Bldngs_Elec-18
18 Repairs to Motors and Rewinding
Datas of 11.6.1 to 11.6.4 are hold good and
be adopted.
18.1.1 Rewinding the motor of the table / pedestal /
BLD-ELEC-16.6
a) Material
ELEC-9.1.38 Copper enamelled winding wire of fine kg 0.3 701.00 1
quality.
Labour charges towards removing 50%
unserviceable winding wire and cleaning. (on
cost of winding wire)
Labour charges towards rewinding the coils 100%
complete with connections etc., complete.
(on cost of winding wire)
Sundries such as sleeves cotton tape, 40%
minolex paper, solution etc., with
transportion charges.
ELEC-9.1.47 Less cost towards old winding wire kg 0.3 165.00 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
18.1.2 Rewinding the motor of the ceiling fan of
BLD-ELEC-17-1
a) Material
ELEC-9.1.38 35 / 36 Copper enamelled winding wire of kg 0.2 701.00 1
fine quality.
Labour charges towards removing 50%
unserviceable winding wire and cleaning. (on
cost of winding wire)
Labour charges towards rewinding the coils 100%
complete with connections etc., complete.
(on cost of winding wire)
Sundries such as sleeves cotton tape, 40%
minolex paper, solution etc., with
transportion charges.
ELEC-8.1.44 Less cost towards old winding wire kg 0.2 165.00 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
18.1.3 Rewinding the motor of the exhaust fan of
BLD-ELEC-17-1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
18.1.4 Rewinding the motor of the exhaust fan of
BLD-ELEC-17-1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
18.1.5 Rewinding of electric motor upto 1 HP single
BLD-ELEC-17-1 phase upto 1400 RPM of all types and
makes with copper wire, overhauling with
minor repairs, testing for the original speed
and no load consumption .
a) Material
ELEC-9.1.38 Suitable guage copper winding wire fine kg 2.7 701.00 1
quality
Labour charges towards removing of old 5%
unserviceable winding wire.(on cost of
winding wire)
Labour charges towards rewinding copper 12%
coils complete with connections.(on cost of
winding wire)
Sundries such as sleeves, cotton tape, 2%
minolex paper solution etc., with
transportation.
ELEC-8.1.44 Less cost towards old winding wire kg 2.7 165.00 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
18.1.6 Rewinding of electric motor 2 HP single
BLD-ELEC-17-1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
18.1.7 Rewinding of electric motor 3 HP three
BLD-ELEC-17-1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
18.1.8 Rewinding of electric motor 5 HP three
BLD-ELEC-17-1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
18.1.9 Rewinding of electric motor 7.5 HP three
BLD-ELEC-17-1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
18.1.10 Rewinding of electric motor 10 HP three
BLD-ELEC-17-1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
18.1.11 Rewinding of electric motor 12.50 HP three
BLD-ELEC-17-1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
18.1.12 Rewinding of electric motor 15 HP three
BLD-ELEC-17-1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
18.1.13 Rewinding of electric motor 20 HP three
BLD-ELEC-17-1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
18.1.14 Rewinding of submersible motor upto 15 HP
BLD-ELEC-17-1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Bldngs_Elec-18-2
18.2 Bearings
BLD-ELEC-17-2
a) Material
ELEC-5.11.2 Ball Bearings suitable for 2 to 3 HP Motor each 1 231.00 1
inclusive of taxes
Labour charges for removing the existing 50%
unserviceable bearing and fixing the new
ball bearing with special T&P. (on cost of Ball
Bearing)
Transportation and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
18.2.3 Replacing the existing bearing of approved
BLD-ELEC-17-2
a) Material
ELEC-5.11.3 Ball Bearings suitable for 5 to 7.5 HP Motor each 1 306.00 1
inclusive of taxes
Labour charges for removing the existing 50%
unserviceable bearing and fixing the new
ball bearing with special T&P. (on cost of Ball
Bearing)
Transportation and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
18.2.4 Replacing the existing bearing of approved
BLD-ELEC-17-2
a) Material
ELEC-5.11.4 Ball Bearings suitable for 10 to 12.5 HP each 1 319.00 1
Motor inclusive of taxes
Labour charges for removing the existing 50%
unserviceable bearing and fixing the new
ball bearing with special T&P. (on cost of Ball
Bearing)
Transportation and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
18.2.5 Replacing the existing bearing of approved
BLD-ELEC-17-2
a) Material
ELEC-5.11.5 Ball Bearings suitable for 15 to 20 HP Motor each 1 489.00 1
inclusive of taxes
Labour charges for removing the existing 50%
unserviceable bearing and fixing the new
ball bearing with special T&P. (on cost of Ball
Bearing)
Transportation and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
BLD-ELEC-17-2
a) Material
ELEC-5.11.7 Cost of GM / Bush / Rubber / Ring washer each 1 40.00 1
etc.,
Labour charges for removing the existing 50%
unserviceable bush/ ring washer and fixing
the new with special T&P.(on cost of
material)
Rounding Off
Sub Total
Overheads & Contractors Profit 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
BLD-ELEC-17-2
Rounding Off
Sub Total
Overheads & Contractors Profit 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour considered for 10 jobs /
day
- Electrical Items For Buildings
SWG (ISI Mark) MS Surface conduit pipe duly threading at Joints with all
Separators with chromium plated base saddles and No.18 SWG MS box for
cluding cost of Cement, all materials, accessories and all labour charges etc.,
m 9900.00
Nos 330.00
Nos 178.00
Nos 56.00
Nos 236.00
Nos 422.00
Nos 324.00
Nos 280.80
No 219.00
Kg 57.50
day 1944.00
day 1620.00
day 1620.00
0.00
17187.30
2340.05
19527.35
0.00
0.00
19527.35
195.27
SWG (ISI MARK) MS Surface pipe duly threading at Joints with all required
s with chromium plated base saddles and No.18 SWG MS box for run of mains
s, accessories and all labour charges etc., complete.
m 12675.00
Nos 247.50
Nos 144.00
Nos 42.00
Nos 177.00
Nos 330.00
Nos 172.80
Nos 309.60
Kg 57.50
day 1944.00
day 1620.00
day 1620.00
0.00
19339.40
2633.06
21972.46
0.00
0.00
21972.46
219.72
SWG (ISI MARK) MS Surface pipe duly threading at Joints with all required
s with chromium plated base saddles and No.18 SWG MS box for run of mains
s, accessories and all labour charges etc., complete.
m 17850.00
Nos 247.50
Nos 144.00
Nos 42.00
Nos 177.00
Nos 366.00
Nos 13.00
Nos 58.00
Kg 57.50
day 1944.00
day 1620.00
day 1620.00
0.00
24139.00
3286.52
27425.52
0.00
0.00
27425.52
274.26
SWG (ISI Mark) MS concealed conduit, duly threadig at Joints, on wall with
ling the wall for light, Fan and separate plug point including necessary sheet
nd all labour charges etc. complete.
m 9900.00
Nos 88.00
Nos 213.00
Nos 280.80
Kg 57.50
day 1944.00
day 1620.00
day 1620.00
day 1692.00
17415.30
2371.09
19786.39
0.00
0.00
19786.39
197.86
WG (ISI MARK) MS concealed conduit, duly threadig at Joints in Slab and on
ding chiselling the wall and necessary Masonary and all labour charges etc.
m 12675.00
Nos 88.00
Nos 852.00
Nos 309.60
Kg 230.00
day 1944.00
day 1620.00
day 1620.00
day 1692.00
0
21030.60
2863.32
23893.92
0.00
0.00
23893.92
238.94
m 17850.00
Nos 88.00
Nos 1488.00
Nos 696.00
Kg 230.00
day 1944.00
day 1620.00
day 1620.00
day 1692.00
27228.00
3707.09
30935.09
0.00
0.00
30935.09
309.35
m 1910.00
Nos 56.00
Nos 192.00
Nos 422.00
Nos 204.00
Nos 48.00
Nos 552.00
Kg 115.00
day 1296.00
day 1080.00
day 1080.00
0
6955.00
946.92
7901.92
0.00
0.00
7901.92
79.02
m 2540.00
Nos 56.00
Nos 192.00
Nos 422.00
Nos 228.00
Nos 72.00
Kg 115.00
day 1296.00
day 1080.00
day 1080.00
7081.00
964.08
8045.08
0.00
0.00
8045.08
80.45
m 3690.00
Nos 56.00
Nos 192.00
Nos 819.00
Nos 408.00
Nos 192.00
Kg 115.00
day 1296.00
day 1080.00
day 1080.00
8928.00
1215.55
10143.55
0.00
0.00
10143.55
101.44
m 4250.00
Nos 56.00
Nos 192.00
Nos 1410.00
Nos 444.00
Nos 228.00
Kg 115.00
day 1296.00
day 1080.00
day 1080.00
10151.00
1382.06
11533.06
0.00
0.00
11533.06
115.33
m 8140.00
Nos 56.00
Nos 192.00
Nos 1785.00
Nos 612.00
Nos 336.00
Kg 115.00
day 1296.00
day 1080.00
day 1080.00
14692.00
2000.32
16692.32
0.00
0.00
16692.32
166.92
m 2420.00
Nos 88.00
Nos 219.00
Nos 264.00
Nos 48.00
Kg 230.00
day 1296.00
day 1080.00
day 1080.00
day 1128.00
7853.00
1069.19
8922.19
0.00
0.00
8922.19
89.22
m 1910.00
Nos 88.00
Nos 219.00
Nos 264.00
Nos 48.00
Kg 230.00
day 1296.00
day 1080.00
day 1080.00
day 1128.00
7343.00
999.75
8342.75
0.00
0.00
8342.75
83.43
m 3180.00
Nos 88.00
Nos 300.00
Nos 72.00
Kg 230.00
day 1296.00
day 1080.00
day 1080.00
day 1128.00
0
8454.00
1151.01
9605.01
0.00
0.00
9605.01
96.05
m 2540.00
Nos 88.00
Nos 300.00
Nos 72.00
Kg 230.00
day 1296.00
day 1080.00
day 1080.00
day 1128.00
7814.00
1063.88
8877.88
0.00
0.00
8877.88
88.78
m 3180.00
Nos 3.00
Nos 72.00
day 1296.00
day 1080.00
day 1080.00
6711.00
913.70
7624.70
0.00
0.00
7624.70
76.25
m 2540.00
day 648.00
day 540.00
day 1080.00
12.70
4820.70
656.34
5477.04
0.00
0.00
5477.04
54.77
m 3180.00
day 648.00
day 540.00
day 1080.00
15.90
5463.90
743.91
6207.81
0.00
0.00
6207.81
62.08
m 3690.00
day 648.00
day 540.00
day 1080.00
18.45
5976.45
813.69
6790.14
0.00
0.00
6790.14
67.90
m 6350.00
day 648.00
day 540.00
day 1080.00
31.75
8649.75
1177.66
9827.41
0.00
0.00
9827.41
98.27
m 1051.00
Nos 108.00
Nos 126.00
Nos 3.65
day 388.80
day 648.00
day 324.00
2649.45
360.72
3010.17
0.00
0.00
3010.17
501.70
m 1051.00
Nos 126.00
Nos 147.00
Nos 3.65
day 453.60
day 756.00
day 378.00
2915.25
396.91
3312.16
0.00
0.00
3312.16
473.17
m 1051.00
Nos 270.00
Nos 405.00
day 972.00
day 810.00
day 810.00
4318.00
587.90
4905.90
0.00
0.00
4905.90
327.06
Nos 27.00
Nos 18.00
day 43.42
day 36.18
124.60
16.96
141.56
0.00
0.00
141.56
141.56
Nos 44.00
Nos 65.00
day 64.80
day 54.00
227.80
31.01
258.81
0.00
0.00
258.81
258.81
Nos 30.00
Nos 44.00
Nos 65.00
day 64.80
day 54.00
day 54.00
311.80
42.45
354.25
0.00
0.00
354.25
354.25
Nos 32.00
Nos 115.00
day 32.40
day 27.00
206.40
28.10
234.50
0.00
0.00
234.50
234.50
Nos 32.00
Nos -21.00
day 32.40
day 27.00
70.40
9.58
79.98
0.00
0.00
79.98
79.98
Nos 250.00
Nos 90.00
day 81.00
day 67.50
day 67.50
556.00
75.70
631.70
0.00
0.00
631.70
631.70
Nos 21.00
Nos 3.64
day 32.40
day 27.00
84.04
84.04
Nos 18.00
Nos 17.00
Nos 32.00
Nos 11.00
day 32.40
day 27.00
137.40
18.71
156.11
0.00
0.00
156.11
156.11
Nos 45.00
Nos 14.00
day 40.18
day 33.48
132.66
18.06
150.72
0.00
0.00
150.72
150.72
Nos 102.00
Nos 25.00
day 40.18
day 33.48
200.66
27.32
227.98
0.00
0.00
227.98
227.98
Nos 240.00
Nos 44.00
day 40.18
day 33.48
357.66
48.70
406.36
0.00
0.00
406.36
406.36
m 2102.00
day 434.16
day 1080.00
day 361.80
3977.96
541.60
4519.56
0.00
0.00
4519.56
45.20
m 1051.00
day 220.32
day 540.00
day 183.60
1994.92
271.61
2266.53
0.00
0.00
2266.53
22.67
m 3110.00
day 434.16
day 1080.00
day 361.80
4985.96
678.84
5664.80
0.00
0.00
5664.80
56.65
m 5020.00
day 434.16
day 1080.00
day 361.80
6895.96
938.88
7834.84
0.00
0.00
7834.84
78.35
m 2510.00
day 220.32
day 540.00
day 183.60
3453.92
470.25
3924.17
0.00
0.00
3924.17
39.24
m 7666.00
day 648.00
day 1620.00
day 540.00
10474.00
1426.04
11900.04
0.00
0.00
11900.04
119.00
m 11656.00
day 648.00
day 1620.00
day 540.00
14464.00
1969.27
16433.27
0.00
0.00
16433.27
164.33
m 18060.00
day 648.00
day 1620.00
day 540.00
20868.00
2841.18
23709.18
0.00
0.00
23709.18
237.09
m 28560.00
day 648.00
day 1620.00
day 540.00
31368.00
4270.75
35638.75
0.00
0.00
35638.75
356.39
Nos 1351.00
Nos 50.00
day 108.22
day 90.18
day 179.82
6.76
1785.98
243.16
2029.14
0.00
0.00
2029.14
2029.14
Nos 2329.00
Nos 77.00
day 108.22
day 90.18
day 179.82
11.65
2795.87
380.66
3176.53
0.00
0.00
3176.53
3176.53
Nos 5578.00
Nos 248.00
day 108.22
day 90.18
day 179.82
27.89
6232.11
848.50
7080.61
0.00
0.00
7080.61
7080.61
Nos 7280.00
Nos 248.00
day 129.60
day 216.00
day 216.00
36.40
8126.00
1106.35
9232.35
0.00
0.00
9232.35
9232.35
Nos 8740.00
Nos 363.00
day 129.60
day 216.00
day 216.00
43.70
9708.30
1321.79
11030.09
0.00
0.00
11030.09
11030.09
Nos 13445.00
Nos 704.00
day 162.00
day 270.00
day 270.00
67.23
14918.23
2031.12
16949.35
0.00
0.00
16949.35
16949.35
Nos 22759.00
Nos 1425.00
day 162.00
day 270.00
day 270.00
113.80
24999.80
3403.72
28403.52
0.00
0.00
28403.52
28403.52
Nos 4135.00
day 108.22
day 90.18
day 179.82
4513.22
614.47
5127.69
0.00
0.00
5127.69
5127.69
Nos 7828.00
day 108.22
day 90.18
day 179.82
39.14
8245.36
1122.61
9367.97
0.00
0.00
9367.97
9367.97
Nos 10474.00
day 129.60
day 216.00
day 216.00
52.37
11087.97
1509.63
12597.60
0.00
0.00
12597.60
12597.60
Nos 14884.00
day 129.60
day 216.00
day 216.00
74.42
15520.02
2113.05
17633.07
0.00
0.00
17633.07
17633.07
Nos 22712.00
day 162.00
day 270.00
day 270.00
113.56
23527.56
3203.28
26730.84
0.00
0.00
26730.84
26730.84
Nos 27012.00
day 162.00
day 270.00
day 270.00
135.06
27849.06
3791.65
31640.71
0.00
0.00
31640.71
31640.71
Nos 0.00
day 0.00
day 0.00
day 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Nos 0.00
day 0.00
day 0.00
day 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Nos 6060.00
day 108.22
day 90.18
day 179.82
30.30
6468.52
880.69
7349.21
0.00
0.00
7349.21
7349.21
Nos 6813.00
day 108.22
day 90.18
day 179.82
34.07
7225.29
983.72
8209.01
0.00
0.00
8209.01
8209.01
Nos 7194.00
day 108.22
day 90.18
day 179.82
35.97
7608.19
1035.86
8644.05
0.00
0.00
8644.05
8644.05
Nos 8700.00
day 108.22
day 90.18
day 179.82
43.50
9121.72
1241.92
10363.64
0.00
0.00
10363.64
10363.64
Nos 16025.00
day 129.60
day 216.00
day 216.00
80.13
16666.73
2269.18
18935.91
0.00
0.00
18935.91
18935.91
Nos 20818.00
day 129.60
day 216.00
day 216.00
104.09
21483.69
2925.00
24408.69
0.00
0.00
24408.69
24408.69
Nos 26208.00
day 129.60
day 216.00
day 216.00
131.04
26900.64
3662.52
30563.16
0.00
0.00
30563.16
30563.16
Nos 760.00
Nos 367.00
Nos 804.00
day 324.00
day 270.00
day 540.00
9.66
3074.66
418.61
3493.27
0.00
0.00
3493.27
3493.27
Nos 800.00
Nos 367.00
Nos 1206.00
day 324.00
day 270.00
day 540.00
11.87
3518.87
479.09
3997.96
0.00
0.00
3997.96
3997.96
Nos 1045.00
Nos 367.00
Nos 1608.00
day 324.00
day 270.00
day 540.00
15.10
4169.10
567.62
4736.72
0.00
0.00
4736.72
4736.72
Nos 990.00
Nos 367.00
Nos 804.00
day 324.00
day 270.00
day 540.00
10.81
3305.81
450.09
3755.90
0.00
0.00
3755.90
3755.90
Nos 1245.00
Nos 367.00
Nos 1206.00
day 324.00
day 270.00
day 540.00
14.09
3966.09
539.98
4506.07
0.00
0.00
4506.07
4506.07
Nos 1505.00
Nos 367.00
Nos 1608.00
day 324.00
day 270.00
day 540.00
17.40
4631.40
630.57
5261.97
0.00
0.00
5261.97
5261.97
Nos 1500.00
Nos 367.00
Nos 2412.00
day 324.00
day 540.00
day 540.00
21.40
5704.40
776.65
6481.05
0.00
0.00
6481.05
6481.05
Nos 1500.00
Nos 890.00
Nos 2412.00
day 324.00
day 540.00
day 540.00
24.01
6230.01
848.22
7078.23
0.00
0.00
7078.23
7078.23
Nos 3750.00
Nos 956.00
Nos 3618.00
day 324.00
day 540.00
day 540.00
41.62
9769.62
1330.13
11099.75
0.00
0.00
11099.75
11099.75
Nos 2491.00
Nos 814.00
Nos 2412.00
day 324.00
day 540.00
day 540.00
28.59
7149.59
973.42
8123.01
0.00
0.00
8123.01
8123.01
Nos 2491.00
Nos 890.00
Nos 2412.00
day 324.00
day 540.00
day 540.00
28.97
7225.97
983.82
8209.79
0.00
0.00
8209.79
8209.79
Nos 7770.00
Nos 0.00
Nos 3618.00
day 324.00
day 540.00
day 540.00
56.94
12848.94
1749.38
14598.32
0.00
0.00
14598.32
14598.32
Nos 0.00
Nos 0.00
Nos 0.00
Nos 0.00
day 0.00
day 0.00
day 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Nos 0.00
Nos 0.00
Nos 0.00
Nos 0.00
day 0.00
day 0.00
day 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Nos 6045.00
Nos 890.00
Nos 0.00
Nos 1206.00
day 324.00
day 540.00
day 540.00
40.71
9585.71
1305.09
10890.80
0.00
0.00
10890.80
10890.80
Nos 9823.00
Nos 956.00
Nos 3820.00
Nos 1608.00
day 324.00
day 540.00
day 540.00
81.04
17692.04
2408.77
20100.81
0.00
0.00
20100.81
20100.81
Nos 6045.00
Nos 890.00
Nos 1101.00
Nos 2412.00
day 324.00
day 540.00
day 540.00
52.24
11904.24
1620.76
13525.00
0.00
0.00
13525.00
13525.00
Nos 9823.00
Nos 956.00
Nos 1464.00
Nos 2412.00
day 648.00
day 540.00
day 540.00
73.28
16456.28
2240.52
18696.80
0.00
0.00
18696.80
18696.80
Nos 9823.00
Nos 8700.00
Nos 3820.00
Nos 2412.00
day 648.00
day 540.00
day 540.00
123.78
26606.78
3622.51
30229.29
0.00
0.00
30229.29
30229.29
Nos 901.00
Nos 201.00
day 162.00
day 135.00
day 135.00
5.51
1539.51
209.60
1749.11
0.00
0.00
1749.11
1749.11
Nos 1700.00
Nos 955.00
day 213.84
day 178.20
day 178.20
13.28
3238.52
440.92
3679.44
0.00
0.00
3679.44
3679.44
cum 103.96
cum 558.50
165.62
m 887.50
Nos 16.32
Nos 96.00
Set 44.00
Nos 220.00
Kg 600.00
Kg 200.00
day 270.00
day 270.00
6.32
3438.22
468.11
3906.33
0.00
0.00
3906.33
3906.33
cum 155.32
cum 1160.43
328.94
cum 3917.47
cum 811.16
Sqm 728.82
m 887.50
m 57.60
Nos 63.00
Nos 83.00
Nos 16.32
Nos 96.00
Set 44.00
Kg 60.00
Kg 200.00
No 400.00
Nos 648.00
6.24
9663.80
1315.73
10979.53
0.00
0.00
10979.53
10979.53
cum 155.32
cum 1160.43
328.94
cum 3917.47
cum 811.16
Sqm 728.82
m 887.50
m 57.60
Nos 63.00
Nos 83.00
Nos 16.32
Kg 6050.00
Nos 96.00
Set 44.00
Kg 60.00
Kg 200.00
No 400.00
Nos 648.00
36.49
15744.05
2143.55
17887.60
0.00
0.00
17887.60
17887.60
Kg 707.20
Nos 66.00
day 1080.00
1853.20
252.31
2105.51
0.00
0.00
2105.51
21.06
Kg 455.60
Nos 66.00
day 1080.00
1601.60
218.06
1819.66
0.00
0.00
1819.66
18.2
Kg 299.20
Nos 66.00
day 1080.00
1445.20
196.76
1641.96
0.00
0.00
1641.96
16.42
Kg 176.80
Nos 66.00
day 1080.00
1322.80
180.10
1502.90
0.00
0.00
1502.90
15.03
Kg 8024.00
day 1296.00
day 1080.00
10400.00
1415.96
11815.96
0.00
0.00
11815.96
118.16
Kg 12784.00
day 1296.00
day 1080.00
15160.00
2064.03
17224.03
0.00
0.00
17224.03
172.24
Kg 16048.00
day 1296.00
day 1080.00
18424.00
2508.43
20932.43
0.00
0.00
20932.43
209.32
Kg 31895.50
day 648.00
day 540.00
day 540.00
33623.50
4577.84
38201.34
0.00
0.00
38201.34
382.01
Kg 8096.55
day 648.00
day 540.00
day 540.00
9824.55
1337.61
11162.16
0.00
0.00
11162.16
111.62
Kg 1694.00
day 648.00
day 540.00
day 540.00
3422.00
465.91
3887.91
0.00
0.00
3887.91
38.88
Kg 40111.50
day 1080.00
day 1080.00
42271.50
5755.26
48026.76
0.00
0.00
48026.76
480.27
Kg 102668.50
day 1080.00
day 1080.00
104828.50
14272.40
119100.90
0.00
0.00
119100.90
1191.01
m 1474.00
Kg 455.60
Nos 330.00
day 648.00
day 540.00
day 540.00
11.30
3998.90
544.45
4543.35
0.00
0.00
4543.35
45.43
m 2994.00
Kg 455.60
Nos 330.00
day 648.00
day 540.00
day 540.00
18.90
5526.50
752.43
6278.93
0.00
0.00
6278.93
62.79
m 3222.00
Kg 455.60
Nos 330.00
day 648.00
day 540.00
day 540.00
20.04
5755.64
783.63
6539.27
0.00
0.00
6539.27
65.39
m 5988.00
Kg 911.20
Kg 15.25
Nos 440.00
day 1296.00
day 1080.00
day 1080.00
36.77
10847.22
1476.85
12324.07
0.00
0.00
12324.07
123.24
m 6444.00
Kg 911.20
Kg 15.25
Nos 440.00
day 1296.00
day 1080.00
day 1080.00
39.05
11305.50
1539.24
12844.74
0.00
0.00
12844.74
128.45
m 10772.00
Kg 911.20
Kg 15.25
Nos 440.00
day 1296.00
day 1080.00
day 1080.00
60.69
15655.14
2131.45
17786.59
0.00
0.00
17786.59
177.87
m 3017.00
Kg 455.60
Nos 34.00
Nos 110.00
day 648.00
day 540.00
day 540.00
5344.60
727.67
6072.27
0.00
0.00
6072.27
60.72
m 3629.00
Kg 455.60
Nos 34.00
Nos 110.00
day 648.00
day 540.00
day 540.00
5956.60
810.99
6767.59
0.00
0.00
6767.59
67.68
m 6034.00
Kg 455.60
Nos 68.00
Nos 110.00
day 648.00
day 540.00
day 540.00
8395.60
1143.06
9538.66
0.00
0.00
9538.66
95.39
m 7258.00
Kg 455.60
Nos 68.00
Nos 110.00
day 648.00
day 540.00
day 540.00
9619.60
1309.71
10929.31
0.00
0.00
10929.31
109.29
m 5386.00
Kg 455.60
Nos 68.00
Nos 110.00
day 648.00
day 540.00
day 540.00
7747.60
1054.84
8802.44
0.00
0.00
8802.44
8802.44
88.02
kg 1067.50
Nos 36.00
Nos 200.00
Nos 270.00
Nos 25.00
7.99
day 81.00
day 67.50
1754.99
238.94
1993.93
0.00
0.00
1993.93
1993.93
kg 532.50
Nos 24.00
Nos 200.00
Nos 90.00
Nos 25.00
4.36
day 64.80
day 54.00
994.66
135.42
1130.08
0.00
0.00
1130.08
1130.08
Nos 200.00
Pair 300.00
Cum 486.64
Cum 82.55
Nos 200.00
Nos 75.00
Nos 324.00
Nos 540.00
2208.19
300.65
2508.84
0.00
0.00
2508.84
2508.84
kg #REF!
kg #REF!
Nos 200.00
kg #REF!
day 162.00
day 135.00
day 270.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
m #REF!
m 1424.30
Nos #REF!
day 1296.00
day 4320.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
m 15383.00
m 1538.30
Nos 2000.00
day 1296.00
day 4320.00
24537.30
3340.75
27878.05
0.00
0.00
27878.05
27878.05
m 25013.00
m 2501.30
Nos 2000.00
day 1296.00
day 4320.00
35130.30
4782.99
39913.29
0.00
0.00
39913.29
39913.29
Nos 0
day #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
cum 518.00
cum 0.00
518.00
70.53
588.53
0
0
588.53
Nos 1955.33
419.04
day Err:509
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
356.04
day #REF!
day #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
16.92
670.46
day #REF!
day #REF!
day Err:509
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
day 270.00
270.00
36.76
306.76
0
0
306.76
306.76
No 3129.00
156.45
day 270.00
3555.45
484.07
4039.52
0
0
4039.52
4039.52
No 1665.00
83.25
day 270.00
2018.25
274.78
2293.03
0
0
2293.03
2293.03
No 1665.00
83.25
day 270.00
2018.25
274.78
2293.03
0
0
2293.03
2293.03
8820.00
441.00
day 178.2
9439.20
1285.15
10724.35
0
0
10724.35
10724.35
6000
300
day 178.2
6478.2
882.01
7360.21
0
0
7360.21
7360.21
No 1260.00
No 45.00
1305.00
177.68
1482.68
0
0
1482.68
1482.68
No 643.00
No #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
No 652.00
No #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
No 2570.00
No 400.00
2970.00
0
0
0
2970.00
#REF!
#DIV/0!
#REF!
#REF!
#REF!
#REF!
#REF!
No #REF!
No #REF!
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
No 2570.00
No #REF!
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
No 3975.00
No 900.00
0.00
4875.00
663.73
5538.73
0.00
0.00
5538.73
5538.73
No 4340.00
No 1350.00
0.00
5690.00
774.69
6464.69
0.00
0.00
6464.69
6464.69
No 4340.00
No 1100.00
0.00
5440.00
740.66
6180.66
0.00
0.00
6180.66
6180.66
No 1838.00
No 678.00
0.00
2516.00
342.55
2858.55
0.00
0.00
2858.55
2858.55
No #REF!
No #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
No 3822.00
No #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
No #REF!
No #REF!
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
No #REF!
No #REF!
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
No #REF!
No #REF!
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
No 536.00
No 60.00
0.00
596.00
81.15
677.15
0.00
0.00
677.15
677.15
No 1071.00
No 80.00
0.00
1151.00
156.71
1307.71
0.00
0.00
1307.71
1307.71
No #REF!
No 1100.00
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
No 5765.00
No 1400.00
0.00
7165.00
975.51
8140.51
0.00
0.00
8140.51
8140.51
No 1040.00
No 0.56
No 1.18
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 1040.00
No 0.56
No 1.18
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 1040.00
No 0.56
No 1.18
No 14.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 99.00
No 1040.00
No 0.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 354.00
No 2080.00
day Err:509
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 354.00
No 2080.00
day Err:509
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 1040.00
day Err:509
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 355.00
No 1300.00
day Err:509
day Err:509
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 215.00
No
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 385.00
No
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No #REF!
No 12.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 350.00
No
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 578.00
578.00
78.69
656.69
0
0
656.69
656.69
No 766.00
No 45.00
0.00
811.00
110.42
921.42
0
0
921.42
921.42
Err:509
Err:509
No 1173.00
No 76.00
1249.00
170.05
1419.05
0
0
1419.05
1419.05
No 146.00
No 38.00
184.00
25.05
209.05
0
0
209.05
209.05
No 1615.00
No 76.00
1691.00
230.23
1921.23
0
0
1921.23
1921.23
No 2300.00
No 76.00
2376.00
323.49
2699.49
0
0
2699.49
2699.49
No 2300.00
No 76.00
2376.00
323.49
2699.49
0
0
2699.49
2699.49
No 540.00
No 120.00
660.00
89.86
749.86
0
0
749.86
749.86
Nos 750.00
Nos 115.00
day Err:509
day Err:509
Err:509
Err:509
No #REF!
No #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
No #REF!
No 0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
No #REF!
No 0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
No 50250.00
1005.00
51255.00
6978.37
58233.37
0
0
58233.37
58233.37
No 56490.00
1129.80
57619.80
7844.94
65464.74
0
0
65464.74
65464.74
day
day
day
day
day
day
Mtr 1000
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 8150.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 9250.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 1590.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 156.00
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 410.00
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 200.00
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 242.00
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 225.00
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 485.00
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 225.00
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 475.00
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 3750.00
75.00
75.00
3900.00
530.99
4430.99
0
0
4430.99
4430.99
No 810.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 1805.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 2250.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
1760.00
240.00
18.00
97.40
28.85
72.00
2216.25
1840.00
240.00
18.00
97.40
28.85
Err:509
Err:509
Err:509
Err:509
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 2714.00
54.28
2768.28
376.9
3145.18
0
0
3145.18
3145.18
No 1265.00
13.00
1278.00
174.00
1452.00
0.00
0.00
1452.00
1452.00
No 1350.00
14.00
1364.00
185.71
1549.71
0.00
0.00
1549.71
1549.71
0.00
10.00
day 39.51
day 47.87
97.40
0.00
day 28.84
28.85
0.00
day #REF!
#REF!
day #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
No #REF!
day #REF!
day #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
M 10.40
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
m 10.40
Kg 165.00
day Err:509
day Err:509
day Err:509
20.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 10900.00
218
11118.00
1513.72
12631.72
0
0
12631.72
12631.72
No 330.00
No 52.00
6.60
day Err:509
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
day
day
No 400.00
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 275.00
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 275.00
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 5145.00
102.90
day Err:509
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 7455.00
149.10
day Err:509
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 9975.00
199.50
day Err:509
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 14700.00
294.00
day Err:509
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 19950.00
399.00
day Err:509
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 24150.00
483.00
day Err:509
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
No 17850.00
60
358.2
day Err:509
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 21000.00
60.00
421.2
day Err:509
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 25000.00
60.00
501.2
day Err:509
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 33600.00
60.00
673.2
day Err:509
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 780.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 1450.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
day
day
day
day
day
day
day
day
day
day
No 71.00
Kg 0.00
Km 0.00
1.50
1.50
1.50
1.50
1.75
1.75
2.00
2.00
2.40
2.40
2.70
2.70
3.10
3.10
4.00
4.00
4.50
4.50
Total cost of
pole
11
Kg 2418.0
2418.0
329.21
2747.2
2747.21
2747.21
Kg 165.8
Kg 351.0
10
day 129.6
day 129.6
786.0
107.01
892.96
892.96
892.96
day
day
day
day
No
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
cum 55
cum 1105.08
Sqm 302.82
day #REF!
day #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
day
day
4725.34
1024.00
2.49
5751.83
sqm 1168.7
1168.70
159.12
1327.82
1327.82
1327.82
No #REF!
1.00
day #REF!
#REF!
No
day
sq. #DIV/0!
inch
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
sq.ft 456.18
9.12
136.85
182.47
182.47
136.85
1103.94
150.3
1254.24
0
0
1254.24
1254.24
13500.97
sq. #REF!
inch
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
No 2500.00
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 2500.00
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 4556.00
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 2700.00
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 10023.00
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 175.00
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 135.00
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 450.00
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 1050.00
day Err:509
0.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 3037.00
day Err:509
0.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Deleted
day
Deleted
Deleted
Deleted
Deleted
Deleted
Deleted
Deleted
Deleted
No 327.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 491.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 578.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 654.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 22.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 30.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 33.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 40.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 55.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 65.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 88.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 104.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 149.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 215.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 284.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 418.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 12.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 14.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 17.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 20.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 25.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 27.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 35.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 40.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 46.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 71.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 92.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 119.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 1300.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 1545.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No #REF!
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 2230.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 4000.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No #REF!
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 5425.00
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 5940.00
3.51
No 3564.00
No 165.00
No 1080.00
day 1275.00
day 648.00
day 1080.00
day 1020.00
14775.51
2011.69
16787.20
0
0
16787.20
16787.20
167.87
No 5940.00
3.51
No 3564.00
No 165.00
No 1080.00
day 1275.00
day 1036.80
day 1782.00
day 1020.00
15866.31
2160.2
18026.51
0
0
18026.51
18026.51
180.27
ed for 60 Mts / day
not less than 600 mm in a trench. Sand filling shall be provided at the
e cable.
added forBricks shall
finished be provided on either side of the laid cable. Sand
item.
No
No
No
No
day
day
commissioning of following specifications of D.G. Set consists of Engine and
d
RD by/ means of flexible
CROMPTON cooping
on D.G.S & Dwith guard make.
approved and mounted on a common
The alternator base
of the output
15V, 50
AVES Hz., A.C., 0.8
/ CUMMINS P.f lagging
/ ASHOK LEY at 1500orRPM.
LAND DGS&DThe approved.
alternator is self excited,
Diesel Engine
et at 1500 RPM
fabricated withwith class A2
16 SWG Governing
CRCA so asThe
sheet steel. to enable
control the alternator
panel shall betototally
give
loor mounted2. /Ammeter
wall mounted type and
with Selector shall be comprising the following
Switch
ating 4. P.F. Meter and frequency Meter
6. KWH Meter of required rating
coustic enclosure (sound proof enclosure cum container) for the above Genset
c enclosure shall consists of self supporting frame work put together with help
and dismantling. The vertical and Horizontal structure 8is to be fabricated with
Deleted
Deleted
Deleted
Deleted
No 617400.00
61740.00
12348.00
691488.00
94146.09
785634.09
0
0
785634.09
785634.09
No 617400.00
61740.00
12348.00
691488.00
94146.09
785634.09
0
0
785634.09
785634.09
No 810000.00
81000.00
16200.00
907200.00
123515.28
1030715.28
0
0
1030715.28
1030715.28
No
0
0.00
0
0
0.00
0.00
No 1100000.00
110000.00
22000.00
1232000.00
167736.8
1399736.80
0
0
1399736.80
1399736.80
No
0
0.00
0
0
0.00
0.00
No 400000.00
8000.00
40000.00
448000.00
60995.2
508995.20
0
0
508995.20
508995.20
No 645000.00
12900.00
64500.00
722400.00
98354.76
820754.76
0
0
820754.76
820754.76
No 735000.00
14700.00
73500.00
823200.00
112078.68
935278.68
0
0
935278.68
935278.68
No 910000.00
18200.00
91000.00
1019200.00
138764.08
1157964.08
0
0
1157964.08
1157964.08
No 200.00
200.00
27.23
227.23
0
0
227.23
227.23
No 1100.00
1100.00
149.77
1249.77
0
0
1249.77
1249.77
No 500.00
500.00
68.08
568.08
0
0
568.08
568.08
day
day
day
day
day
No
day
day
day
No 1500.00
day 213.84
day 178.20
1894.04
257.87
2153.91
0
0
2153.91
2153.91
No 600.00
day 81.00
day 135.00
818.00
111.37
931.37
0
0
931.37
931.37
No 300.00
day 81.00
day 135.00
518.00
70.53
590.53
0
0
590.53
590.53
No 675.00
day 81.00
day 135.00
893.00
121.58
1016.58
0
0
1016.58
1016.58
No Err:509
day 648.00
day 540.00
1190.00
162.02
1354.02
0
0
1354.02
1354.02
No 7000.00
day 648.00
day 540.00
day 540.00
1730.00
235.54
1967.54
0
0
1967.54
1967.54
No 6100.00
day 648.00
day 540.00
day 540.00
1730.00
235.54
1967.54
0
0
1967.54
1967.54
No 5900.00
day 648.00
day 540.00
day 540.00
1730.00
235.54
1967.54
0
0
1967.54
1967.54
No 4000.00
day 648.00
day 540.00
0.00
5190.00
706.62
5898.62
0
0
5898.62
5898.62
KVAR 350.00
day 25.92
day 43.20
0.00
421.12
57.34
480.46
0
0
480.46
480.46
day 25.92
day 43.20
Kg 210.30
105.15
210.30
84.12
Kg 49.50
659.37
89.77
751.14
0
0
751.14
751.14
Kg 140.20
70.10
140.20
56.08
Kg 33.00
439.58
59.85
501.43
0
0
501.43
501.43
Kg 35.05
17.53
35.05
14.02
Kg 8.25
109.90
14.96
126.86
0
0
126.86
126.86
Kg 315.45
157.73
315.45
126.18
Kg 74.25
989.06
134.66
1125.72
0
0
1125.72
1125.72
Kg 1892.70
94.64
227.12
4.54
Kg 445.50
2664.50
362.77
3029.27
0
0
3029.27
3029.27
Kg 2243.20
112.16
269.18
5.38
Kg 528.00
3157.92
429.95
3589.87
0
0
3589.87
3589.87
Kg 3154.50
157.73
378.54
7.57
Kg 742.50
4440.84
604.62
5047.46
0
0
5047.46
5047.46
Kg 3995.70
199.79
479.48
9.59
Kg 940.50
5625.06
765.85
6392.91
0
0
6392.91
6392.91
Kg 4556.50
227.83
546.78
10.94
Kg 1072.50
6414.55
873.34
7289.89
0
0
7289.89
7289.89
Kg 7010.00
350.50
841.20
16.82
Kg 1650.00
9868.52
1343.6
11214.12
0
0
11214.12
11214.12
Kg 8412.00
420.60
1009.44
20.19
Kg 1980.00
11842.23
1612.32
13456.55
0
0
13456.55
13456.55
Kg 10515.00
525.75
1261.80
25.24
Kg 2475.00
14802.79
2015.4
16820.19
0
0
16820.19
16820.19
Kg 12618.00
630.90
1514.16
30.28
Kg 2970.00
17763.34
2418.48
20183.82
0
0
20183.82
20183.82
Kg 13068.00
1306.80
1960.20
98.01
Kg 2970.00
19403.01
2641.72
22046.73
0
0
22046.73
22046.73
No 179.00
89.50
268.50
36.56
305.06
0
0
305.06
305.06
No 231.00
115.50
346.50
47.18
393.68
0
0
393.68
393.68
No 306.00
153.00
459.00
62.49
521.49
0
0
521.49
521.49
No 319.00
159.5
478.50
65.15
543.65
0
0
543.65
543.65
No 489.00
244.50
733.50
99.87
833.37
0
0
833.37
833.37
No 84.00
42.00
126.00
17.15
143.15
0
0
143.15
143.15
No 40.00
20.00
60.00
8.17
68.17
0
0
68.17
68.17
No 38.00
No 54
92.00
12.53
104.53
0
0.00
104.53
104.53
CEMENT MORTARS WITH OP CEMENT
KODADA MUNICIPALITY
DATA BASED ON - 2016 - 2017 SSR
Sep-18
Qty Rate Per
a CEMENT MORTAR (1:1)
Cement 1440 Kg 4.600 1 Kg
Fine aggregate sand for Mortar 1.05 Cum 1493.00 1 Cum
Man mazdoor 0.2 Nos 510.00 1 Nos
Rate per cu.m. Rs
Mortars,
Rate per cu.m. Rs
Mortars,
Amount
6624.00
1567.65
102.00
8293.65
4416.00
1567.65
102.00
6085.65
3312.00
1567.65
102.00
4981.65
2208.00
1567.65
102.00
3877.65
1656.00
1567.65
102.00
3325.65
1324.80
1567.65
102.00
2994.45
1104.00
1567.65
102.00
2773.65
828.00
1567.65
102.00
Mortars,
2497.65
Mortars,
869 of 2191 data-Parks-new
KODADA MUNICIPALITY
DATA BASED ON - 2018 - 2019 SSR
2 RBR-HRTC-2 : Grassing with 'Doobs' grass including watering and maintenance of the lawn for 30 days or more till
the grass forms a thick lawn free from weeds and fit for moving including supplying good earth if needed - as per
Specification 307 MORTH
Unit = sqm
Taking output = 100 sqm 100 Sqm
(i) In rows 15 cm apart in either direction
a) Labour
Mate 0.170 day 540.00 1 day
Mazdoor (Unskilled) for grassing 0.920 day 510.00 1 day
Mazdoor (Unskilled) for maintenance for 30 days 1.000 day 510.00 1 day
b) Machinery
Water tanker 6 KL capacity 0.50 hour 698.88 1 hour
c) Material
Doob grass -M-112 -Irrigation SSR (2015-16) 100.00 kg 6.00 1 kg
Total
d&e) Overheads & Contractors Profit 13.615%
Cost for 100 sqm = a+b+c+d+e
Rate per sqm= (a+b+c+d+e)/100
(ii) In rows 7.5 cm apart in either direction
a) Labour
Mate 0.00 day 540.00 1 day
Mazdoor (Unskilled) for grassing. 1.47 day 510.00 1 day
Mazdoor (Unskilled) for maintenance for 30 days 1.00 day 510.00 1 day
b) Machinery
Water tanker 6 KL capacity 0.75 hour 698.88 1 hour
c) Material
Doob grass -M-112 -Irrigation SSR 200.00 kg 6.00 1 kg
3 RBR-HRTC-3 : Making lawns including ploughing and breaking of clod, removal of rubbish, dressing and
supplying doobs grass roots and planting at 15 cm apart, including supplying and spreading of farm yard manure at
rate of 0.18 cum per 100 sqm- as per Specification 307 MORTH
Unit = sqm
Taking output = 100 sqm 100 Sqm
870 of 2191 data-Parks-new
a) Labour
Mate 0.00 day 540.00 1 day
Mazdoor (Unskilled) for preparation of ground 0.65 day 510.00 1 day
Mali for fetching doobs grass roots and grassing at 15 cm 1.00 day 540.00 1 day
apart
b) Machinery
Water tanker 6 KL capacity 0.50 hour 698.88 1 hour
Tractor with tiller 0.01 hour 464.80 1 hour
c) Material
Supply of farm yard manure at site of work ( HMDA FSR 0.18 cum 1183.00 1 cum
2014-15, item no.10, Pg.32
Fine grass -M-113 -Irrigation SSR (2015-16) 100.00 kg 8.00 1 kg
d&e) Overheads & Contractors Profit
13.615%
Cost for 100 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/100
b) Machinery
Water tanker6 KL capacity 6.00 hour 698.88 1 hour
c) Material
Plants - M-100 - Irrigation SSR(2015-2016) 200.00 each 40.00 1 each
Shrubs - M-166 - Irrigation SSR (2015-2016) 800.00 each 15.00 1 each
Manure sludge/Farm yard manure (-rate as per Yanam PSR 63.64 cum 1183.00 1 cum
2013-14, S.No.83, Code No.0160, Pg.64)
5 RBR-HRTC-5 ; Turfing lawns with fine grassing including ploughing, dressing including breaking of clods, removal
of rubbish, dressing and supplying doobs grass roots at 10 cm apart, including supplying and spreading of farm yard
manure at rate of 0.6 cum per 100 sqm - as per Specification 307 MORTH
871 of 2191 data-Parks-new
Unit = sqm
Taking output = 100 sqm 100 Sqm
a) Labour
Mate 0.00 day 540.00 1 day
Mazdoor (Unskilled) for preparation of ground 1.25 day 510.00 1 day
Mali for fetching doobs grass roots hedges and grassing at 1.50 day 540.00 1 day
10 cm apart
b) Machinery
Water tanker6 KL capacity 0.50 hour 698.88 1 hour
Tractor with tiller 0.01 hour 464.80 1 hour
c) Material
Supply of farm yard manure at site of work @ 0.6 cum per 0.60 cum 1183.00 1 cum
100sqm - ( HMDA FSR 2014-15, item no.10, Pg.32
Fine grass 100.00 kg 8.00 1 kg
9 RBR-HRTC-9: Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground,
mixing the soil with decayed farm yard/sludge manure, planting the saplings, backfilling the trench, watering, fixing
the tree guard and maintaining the plants for one year- as per Specification 307 MORTH
Unit = Each
Taking output = 10 trees 10 Nos
a) Labour
Mate - day
Mazdoor (Unskilled) for planting 3.70 day 510.00 1 day
Mazdoor (Unskilled) for maintenance for one year 15.00 day 510.00 1 day
b) Machinery
Water tanker 6 KL capacity 2.00 hour 698.88 1 hour
c) Material
Sapling 2 m high 25 mm dia 10.00 each 20.00 1 each
Farm yard manure - -( HMDA FSR 2014-15, item no.10, 0.94 cum 1183.00 1 cum
Pg.32
Pesticide ( Neem seed Granules) as per quotation 0.50 kg 454.00 1 kg
Cost of water 12.00 KL 98.00 1 KL
Unit = Each
Taking output = one tree guard
a) Labour
Mate day 0.00 1 day
Blacksmith 0.250 day 564.00 1 day
Mazdoor (Unskilled) 0.300 day 510.00 1 day
b) Material
MS iron 25 x 6 mm 19.200 kg 44.50 1 kg
MS iron 25 x 3 mm 9.600 kg 44.50 1 kg
Add 5 per cent of cost of material for riveting, bolting and
welding accessories
c) Machinery
Tractor-trolley 0.040 hour 464.80 1 hour
872 of 2191 data-Parks-new
d) Painting
Painting two coats including priming 1.770 sqm 112.35 1 sqm
38 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix m-20
(Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage
charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top
surface to the required level curing etc., complete for finished item of work with nomonal reinforcement
Unit : 1cum
A. MATERIALS:
873 of 2191 data-Parks-new
39 BLD-CSTN-6-12-(67) : Construction of RR Masonary in Cement Mortor ( 1:6 ) Prop using hard granite stone
including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage
Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor
,Construction, Scaffolding Charges curing etc., complete for finished item of Work .
A. MATERIALS:
Cement 79.20 Kg 4.60 1 Kg
Coursed Rubble Stone ( C-Mat- Sn.10) 0.44 Cum 615.60 1 Cum
Rough Stone ( C-Mat- Sn.8) 0.50 Cum 936.60 1 Cum
Bond Stones 7Nos 0.24x0.24x0.39 =0.16cum( C-Mat- 0.16 Cum 1300.60 1 Cum
Sn.12)
Fine aggregate (Sand) 0.33 Cum 1303.00 1 Cum
B. LABOUR:
Mason 1st class 1.20 day 564.00 1 day
Mazdoor (unskilled) 2.00 day 510.00 1 day
Total A+B Rs
C.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per One Cum Rs
40 BLD-CSTN-6-6-(61) : Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite
stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage
Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor,
Construction, Scaffolding Charges curing etc., complete for finished item of Work .
A. MATERIALS:
Cement 76.80 Kg 4.60 1 Kg
Coursed Rubble Stone 0.94 Cum 615.60 1 Cum
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum 0.16 Cum 1300.60 1 Cum
Fine aggregate (Sand) 0.32 Cum 1303.00 1 Cum
B. LABOUR:
Mason 1st class 1.50 day 564.00 1 day
Mazdoor (unskilled) 2.32 day 510.00 1 day
Total A+B Rs
C.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per One Cum Rs
874 of 2191 data-Parks-new
41 BLD-CSTN-7-3-(74) : Providing raised Cement Pointing to RR Masonary in Cement Mortor (1:3) Prop . for including
cost & conveyance of all materials to site , seignaiorage charges on all materials, labour charges on all materials,
curing etc., Complete for finished item of work
A. MATERIALS:
Cement 28.80 Kg 4.60 1 Kg
Fine aggregate (Sand) 0.06 Cum 1303.00 1 Cum
B. LABOUR:
Mason 2nd class ( Labour-Irrigation-Semi skilled-Sn.35) 0.50 day 540.00 1 day
Mazdoor (unskilled) 0.74 day 510.00 1 day
Total Rs
C.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs
42 BLD-CSTN-8-2-(77) : Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and
conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all
operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for
finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:4) 0.15 Cum 3325.65 1 Cum
B. LABOUR:
Mason 1st class 0.60 day 564.00 1 day
Mazdoor (unskilled) 0.96 day 510.00 1 day
Total A+B
C.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs
43 BLD-CSTN-11-4- (161) : White washing one coat with whiting of approved quality to give an even shade after
thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all
materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but
excluding conveyance charges of materials
Whiting / White Cement - TBSC-R.I-01 1.20 Kg 29.00 1 Kg
Gum, conjee water, or prickly pear juice including necessary LS
fire wood
Brick Layers / Painter ( Labour-Irrigation-Skilled-Sn.11) 0.11 day 564.00 1 day
Mazdoor (unskilled) 0.22 day 510.00 1 day
44 BLD-CSTN-2-9 (17) : Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations
and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering
and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire
charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
Earth filling (ordinary soil) out put 6.00 Cum
b) Labour
Mate (Labour -R&B-Second Class S.No-71) 0.00 day 0.00 1 day
Mazdoor (Labour-Irrigation-Unskilled S.No1) 0.31 day 510.00 1 day
b&c) Overheads & Contractors Profit 13.615%
Re filling
45 RBR-CCPV-13 - ii: Providing and Laying of Interlocking Concrete Block Pavements using precast concrete blocks for
paving of M-30 grade and thickness not less than 50 mm for Non traffic areas conforming to IS 15658:2006 in all
shapes and designs as per the manufacturer's Specification including cost and conveyance of all material and all
labour charges etc,. complete.
Unit = sqm
Taking output = 225 sqm
a) Labour
Mate - day
Mazdoor (Unskilled) 15.90 day 510.00 1 day
Mason (2nd class) 7.00 day 540.00 1 day
b) Machinery
Water tanker 6 kl capacity 2.00 hour 698.88 1 hour
c) Material
i)Supply of CC Blocks - M30 (TBSC-C.IX-02)94 225.00 sqm 304.00 1 sqm
(ii) Edge blocks 60 m x 2 120.00 m 199.81 1m
(iii) Sand as per Table 1500.5 ( C-Mat-Sn.1) 5.42 cum 1303.00 1 cum
Bed = 603x75x 0.03 = 6.75 cum
Joints = 60x0.08 = 0.48 cum
(iv) Water for wetting of bedding sand 3.00 kl 98.00 1 kl
* 2. Edge blocks may be cast-in-situ. Brick masonry toe wall or CC block 300 mm x 300 mm x 150 mm or any other
shape can also be used and their cost shall be analysed/included accordingly
Cost of CC 1:2:4 without CP 1 Cum 4735.83
size of Edge Block 500 mm x 300 mm x 150 mm
Qty of each block of1.00 m length 0.045 Cum 4735.83 1 Cum
Overheads & Contractors Profit 13.615%
total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate for 1 Rmt
876 of 2191 data-Parks-new
46 BLD-CSTN-12-12-(193): Painting with Synthetic Enamel paints - One Coat - for New Wood Work, Old Wood Work &
New Iron Work including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and
all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).
Synthetic Enamel paint (at 20 sqm / litre as per British 1.10 Ltr 251.00 1 Ltr
Paints (I) Ltd. [ TBSC-G.V-02 ]
1st Class Painter 1.1 day. 648.00 1 day.
2nd Class Painter 0 day. 540.00 1 day.
Sundries including brushes, soap, putty etc.,
Total Rs
over heads & contractors profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs
46 RBR-TSRA-29 : Cast in Situ Cement Concrete M20 Kerb: Construction of cement concrete kerb with top and bottom
width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick,
foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation
concrete laid manually, all complete as per clause 408 MORTH
Unit = Running metre
Taking output = 360 metre
Using Concrete Mixer
Cement Concrete
Cement concrete of grade M20 = 12.60 cum
Cement concrete of grade M10 for base= 11.61 cum
Total Concrete = 24.21 cu.m
a) Labour
Mate - day
Mason 2.00 day 540.00 1 day
Mazdoor 16.72 day 510.00 1 day
b) Machinery
Kerb casting machine @ 60 metres/hour 6.00 hour 348.32 1 hour
Concrete mixer 0.48/0.28 cum capacity(16) 12.00 hour 397.50 1 hour
Water tanker 6 KL capacity 5.00 hour 698.88 1 hour
c) Material
Crushed stone aggregate 20 mm nominal size 59 % 21.79 cum 1256.20 1 cum
Coarse sand 30 per cent 10.90 cum 1303.00 1 cum
Cement 11 per cent 5.70 t 4600.00 1t
Cost of water 30.00 KL 98.00 1 KL
ODADA MUNICIPALITY
ASED ON - 2018 - 2019 SSR
Amount in
Rs.
530.4
72.21
602.61
40.20
ss including watering and maintenance of the lawn for 30 days or more till
eds and fit for moving including supplying good earth if needed - as per
91.8
469.2
510.00
349.44
600.00
2020.44
275.08
2295.52
23.00
0
749.7
510.00
524.16
1200.00
2983.86
406.25
3390.11
33.90
e has been provided for every 10 mazdoors as maintenance of grass and
0
331.5
540.00
349.44
4.65
212.94
800.00
2238.53
304.78
2543.31
25.40
6732.00
4193.28
8000.00
12000.00
75286.12
227.00
3528.00
109966.40
14971.93
124938.35
124.94
Turfing of slopes (rough grassing) for a period of one year including
TH
5400.00
10483.20
8820.00
24703.20
3363.34
28066.54
280.70
0.00
637.50
810.00
349.44
4.65
709.80
800.00
3311.39
450.85
3762.24
37.60
d side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground,
dge manure, planting the saplings, backfilling the trench, watering, fixing
r one year- as per Specification 307 MORTH
1887.00
7650.00
1397.76
200.00
1112.02
227.00
1176.00
13649.78
1858.42
15508.20
1550.80
cm dia and 2 metre high above ground level formed of 4 Nos (25 x 6 mm)
to 3 Nos (25 x 6 mm) iron rings in two halves, bolted together with 8 mm
two coats with paint of approved brand over a coat of priming, complete
0.00
141.00
153.00
854.40
427.20
18.59
880 of 2191 data-Parks-new
198.86
1793.05
244.12
2037.17
be measured and paid separately as per design .
e chapter as Traffic signs.
in central divider portion with initial lead in layers not exceeding 15 cm
y watering and ramming including cost and conveyance of water to work
charges, hire charges of T & P etc., complete for finished item of work.
3294.00
0.00
158.10
3452.10
470
3922.10
0.00
0.00
3922.10
653.68
653.68
ture all works up to Plinth Level: Plain Cement concrete nominal mix
rse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
als like cement, sand, coarse aggregate water etc., to site , seigniorage
, for mixing , laying, concrete , ramming in 15 cm layers, finishing top
mplete for finished item of work.for foundation and under flooring bed.
745.20
719.96
586.35
117.60
397.50
56.40
708.90
3331.91
453.64
3785.55
0.00
0.00
3785.55
1518.00
1265.58
671.85
117.60
397.50
56.40
708.90
4735.83
644.78
5380.61
0.00
0.00
5380.61
5380.61
364.32
270.86
468.30
208.10
429.99
676.80
1020.00
3438.37
468.13
3906.50
0.00
0.00
3906.50
Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite
aterials like Cement, Sand , Water, Granite Stones, including Seigniorage
or cutting Stones to required size and shape, mixing of Cement Mortor,
c., complete for finished item of Work .
353.28
578.66
208.10
416.96
846.00
1183.20
3586.20
488.26
4074.46
0.00
0.00
4074.46
882 of 2191 data-Parks-new
132.48
78.18
270.00
377.40
858.06
116.82
974.88
0.00
0.00
974.88
97.49
498.85
338.40
489.60
1326.85
180.65
1507.50
0.00
0.00
1507.50
150.75
34.80
10.00
62.04
112.20
219.04
1.10
220.14
29.97
250.11
0.00
0.00
250.11
250.11
25.01
883 of 2191 data-Parks-new
0.00
158.10
21.53
179.63
0.00
0.00
179.63
29.94
29.94
8109.00
3780.00
1397.76
68400.00
23977.20
7062.26
294.00
113020.22
15387.70
128407.92
0.00
0.00
128407.92
570.70
213.11
29.01
242.12
0.00
0.00
242.12
884 of 2191 data-Parks-new
hetic Enamel paints - One Coat - for New Wood Work, Old Wood Work &
nce of all materials to site, sales & other taxes, incidental, operational and
item of work. (APSS No. 1201, 1207 & 1212).
276.10
712.80
0.00
0.00
988.90
134.64
1123.54
0.00
0.00
1123.54
112.35
ete M20 Kerb: Construction of cement concrete kerb with top and bottom
mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick,
ond kerb stone, kerb stone laid with kerb laying machine, foundation
clause 408 MORTH
1080.00
8527.20
2089.92
4770.00
3494.40
27372.60
14202.70
26220.00
2940.00
90696.82
12348.37
103045.19
0.00
0.00
103045.19
286.24
Ref. to SSR Description of Item
Pg.No S.No. Item No
IRRIGATION SSR
STATEMENT OF RATES FOR MATERIALS FOR THE YEAR : 2018-19 GENERAL GUIDE LINES FOR REVI
1 Average of the prevailing market rates, ignoring freak rates, shall be the criteria for fixing
2 market rates for materials.
3 The rates for materials shall be inclusive of all taxes, duties and other local levies.
4 The rates for materials shall be exclusive of seigniorage charges wherever applicable.
5 The rates for materials, except those for which lead charges are admissible as per the
statement of lead charges, shall be for all leads.
6 The rates provided for useful rubble / stone chips from excavation shall be at dump yard.
11 1 Acetylene gas
11 2 Asphalt 80/ 100 Grade
11 3 Binding wire
11 4 Burnt stone slab 10 cm thick
11 5 Ordinary Portland Cement (43/53 GRADE) * As per Monthly rates
Portland Pozzolana Cement *(Note: As per Monthly rate fixed by Sub-Committee
Portland Slag Cement *(Note: As per Monthly
11 6 rate fixed by
Chequered Sub-Committee)
plate
11 7 Coarse aggregate 10-4.75 mm(excluding seigniorage charges)
11 8 Coarse aggregate 20-10 mm(excluding seigniorage charges)
11 9 Coarse aggregate 40-20 mm(excluding seigniorage charges)
11 10 Coarse aggregate 80-40 mm(excluding seigniorage charges)
The aggregate rates mentioned above (from Sl.No.7 to Sl.No.10) are exclusive of
Seigniorage charges but including blasting charges of Rs.70/cum and 25% machine
crushing charges. However, if the metal is obtained from hand broken,
the blasting and crushing charges shall be deducted. The aggregate shall be HB
Stone of Granite, Dolamite, Dolerite and Trap. (Quartzite and Basalt with aggregate
impact of less than 20)
11 11 Coir brush
12 Copper sheet 16 SWG
12 13 Coursed rubble stone 30 x 30 x 45 cm(excluding Seigniorage charges)
12 14 Coursed rubble stone 30 x 30 x 60 cm(excluding Seigniorage charges) --Rs.28 each
12 15 Curing Compound
12 16 D - cord
12 17 Delay - noiseless trunk
12 18 Detonating fuse coil
12 19 Detonating shock tube / Cord relays
12 20 Detonator delay type
12 21 Detonator electric
12 22 Detonator ordinary
12 23 Empty cement bag
12 24 Explosive ANFO
12 25 Explosive ANFO high strength booster
12 26 Explosive small dia ( Kelvex-220 or equivalent)
12 27 (a)Fine aggregate/ sand(un- screened) for concrete items & filter items) (excluding
Seigniorage charges)
12 (b) Sand for filling(excluding Seigniorage charges)
12 29 Geo-textile ( filter fabric ) 160 gsm
12 30 Geo-textile ( filter fabric ) 200 gsm
12 31 Geo-textile ( filter fabric ) 250 gsm
12 32 G I Pipe 100 mm dia B Class
12 33 G I Pipe 15 mm dia A class
12 34 G I pipe 25 mm dia A class
12 35 G I pipe 40 mm dia B class
12 36 G I pipe 50 mm dia A class
13 37 G I Pipe 80 mm dia B Class
13 38 G.I Bolts / Nuts and Washers
13 39.a G.I sheet ( plain )
39.b G.I sheet (corrugated)
13 40 Hariyala turfing sods
13 41 Hectometer stone one line dressed
13 42 Hemp yarn
13 43 Honne wood planks
13 44 Hume pipe with collar 150 mm dia
13 45 Hume pipe with collar 300 mm dia
13 46 J- Bolts 30 cm long
13 47 Jungle wood planks
13 48 Khandki stone 15 to 20 cm height
13 49 Khandki stone 20 to 25 cm height
13 50 Khandki stone 25 to 30 cm height
13 51 Kilometer stone one line dressed
13 52 LDPE sheet ( Geo membrane ) 500 micron thick
13 53 LDPE sheet ( Geo membrane ) 750 micron thick
13 54 LDPE sheet ( Geo membrane ) 1000 micron thick
13 55 M S Bolts / Nuts / Washers
13 56 Murum(including loading charges but excluding Seigniorage charges )
13 57 Oxalic acid
13 58 Oxygen gas
13 59 PVC sealing strip
13 60 PVC water stopper 310 mm wide
13 61 PVC pipe of 100 mm dia
13 62 ( a) Reinforcement steel TATA,SAIL,VSP,Jindal as approved by Ministry of
63 ( b) Steel
BIS approved secondary producers confirming to IS:1786-2008 must have valid
13 63 licence and well
Resin bond established
Cement capsule TMT process of either Thermax, Tempcore, Evcon Turbo
& Turboquench
14 64 Rough stone 20 x 20 x 75 cm ( excluding Seigniorage Charges)
14 65.a Shahabad stone slab (excluding seigniorage charges and loading
charges)
65.b Shahabad stone slab with out polishing (excluding seigniorage charges and loading
charges)
14 66 Stone chips ( at dump yard / Spoil)(excluding seigniorage charges and loading
charges)
14 67 Stone chips ( at quarry )(excluding seigniorage charges and loading charges)
14 68 Structural steel angle / channel / beam / bars (including loading
charges)
14 69 Structural steel plate / flats (including loading charges)
14 70 Super Plasticizer ( Conplast RP-264 or equivalent )
14 71 Synthetic Enamel paint 1st quality
14 72 Synthetic adhesive ( Resin + Hardener )
14 73 Tar felt joint filler board 12 mm thick
14 74 Tar felt joint filler board 20 mm thick
14 75 Through stones 20 x 20 x 30 to 45 cm long (excluding seigniorage charges and loading
charges)
14 76 Through stones 25 x 25 x 45 to 60 cm long excluding seigniorage charges and loading
charges)
14 77 Through stones 30 x 30 x 65 to 75 cm long(excluding seigniorage
charges and loading charges)
14 78 Un-coursed rubble stones ( at dump yard /Spoil )(including
seigniorage charges and loading charges)
14 79 Un-coursed rubble stones ( at quarry )(excluding seigniorage charges and loading
charges)
14 80 Water proofing compound
14 81 Welding electrodes 4 mm dia
14 82 Wire brush
15 83 Wire mesh 20 gauge
15 84 Zinc chromate red oxide primer paint
15 85 inorganic zinc silicate
15 86 solvent less coal tar epoxy paint
15 87 Zinc phosphate primer
15 88 Allkyd based iron oxide paint
15 89 a) Cost of hdpe (80mm dia)
15 b) light black MS casing pipe
15 90 80mm steel
welded dia (4mm thick) 100X100X5 mm size
wire fabric
15 91 Protecitive mastic
15 92 Solventless coal tar epoxy (brown)
93 Excavaton of drain with Excavator
94 Crushed stone sand/Rock sand 4.75mm to 2.36 mm as per IS 383 (1970) (excluding
Seigniorage charges)
95 Fly ash conforming to IS: 3812 ( Part II & I)
96 Benching old embankment slopes 0.45 X 0.45 M
97 Laying of Sand Bags in the stipulated places including cost of empty cement bag, sand,
thread, stitching charges and labour charges etc., with 13.615% overhead charges and
contractors profit.
98 Rough stone for revetment 225mm thick ( including Loading charges but excluding
Seigniorage charges)
99 Eradication of Weed growth from Drains, Canals by spraying Chemicals
100 Thinner
101 Credit for excavated rock found suitable for use
102 Earth Cost or compensation for earth taken from private land (Excluding Seigniorage
Charges)
ADDITIONAL MATERIALS FOR GATES & HOISTS FOR THE YEAR : 201
Sl No. DESCRIPTION OF MATERIAL
R & B SoR
RATES OF MATERIALS
(A) STONE AND ROAD MATERIALS
ROUGH STONE QUARRIED INCLUDING WEDGING, BREAKING, BURNING,
SPLITING AND STACKING
1 22.a For R.R Masonary Work (other than Granite, Dolomite and Trap)
2 b.I For SS Revetment work 225 mm
3 b.ii For SS Revetment work 300 mm
4 b.iii For SS Revetment work450 mm
5 c Jeddy Stone above 450 mm to 600 mm
6 d I. Laterite for revetment 225 mm
7 d II. Laterite for revetment 300 mm
8 d.iii Granite for SS revetment 225 mm
9 d.iv Granite for SS revetment 300 mm
Note:- Only when other granite is not available
10 e Laterite for masonry
11 f Cyclopean stones above 0.2 cum
12 g For R.R.Masonry works ( granite, dolamite and trap variety)
13 NOTE:- For items 22 (a) to 22 © and 22 (g) add extra Rs. /cum, wherever quarrying
is done by blasting
COURSED RUBBLE STONE QUARRYING WEDGING, BREAKING, BURNING AND
SPLITTING INCLUDING STACKING FOR SS FIRST SORT WORKS
14 23.a Granite, Dolamite and trap
15 b For other varieties
16 27 Granite stone slabs for culverts, lintels and copings (3 faces dressed coarsed rubble
masonry)
17 NOTE: - For items 23 (a), 23 (b) and 27 add extra Rs. Per Cum, wherever quarrying
is done by blasting
18 28 Bond stones ( 600 x 200 x 200 mm )
19 b Chainage stones and Centre line stones (750x150x150xmm)
19 29(a) Kilometer stones (1100x370x250mm)
b 5 th Kilometer stones (1520x520x250mm)
NOTE: (1) The rates are inclusive of sales tax. 2)As per the rates applicable to the District. 3) Least of the (1) and
(2 ) above may be allowed 4) The price of cement will be reviewed and fixed on monthly basis and rates will be
communicated separately.
98 a Labour for mixing cement mortar
99 b Mixing of cement mortar by machine
100 c Grinding lime mortar or Surkhi mortar
101 d Shell lime slaked and screened
102 e White cement
(D) MORTARS
103 43 to 45 Items 43 to 45
b. Excavation of pipe line trenches for drainage and water supply in rock requiring blasting
with initial lead and lift including cost of blasting materials where the depth is less than
1.5 times the width, in places where there is no habitation.
c. Cutting rock for pipe line trenches by hammers, nuckles and chisels including stacking
where the depth is 1.5 times or more than the width.
d. Cutting rock for pipe line trenches by hammers, nuckles and chisels including stacking
where the depth is less than 1.5 times the width.
e. Cutting rock for works other than pipe lines trenches by hammers, nuckles and chisels
including stacking.
DIAMETER OF PIPE/Fittings in mm :
80mm to 1000mm dia
8. b. Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with flanged ends
carefully into trench and laying them true to alignment and gradient including all
sundries but excluding cost and conveyance of pipes from source of supply. (Reference
to specifications. BIS No.3114/1994)
DIAMETER OF PIPE/Fittings in mm :
80mm to 750mm dia
800
900
1000
1100
1200
9. a. Jointing CI /DI pipes & fittings with s/s ends including cost of pig lead,hemp yarn and
sundries such as cost of fuel for melting lead, filling with water with lead up to 500m
and testing to required pressure complete. (Reference to specifications. BIS
No.3114/94/12288:1997)
DIAMETER OF PIPE/Fittings in mm :
80mm to 800mm
900
1000
1100
1200
9. b. Jointing C.I., D.I. pipes and fittings with rubber gasket (push-on-joint),excluding the cost
of the gasket but including all sundries filling with water, with a water lead up to
500m and testing to required pressure, etc. complete (Reference to
specifications IS 3114/1994/12888/1997)
DIAMETER OF PIPE/Fittings in mm :
80mm to 1000mm dia
10 Jointing CI pipes, fittings and valves with flanged ends including cost of jointing
materials such as bolts, rubber insertion, white lead including filling with water, with lead
up to 500 meters and testing to required pressure complete. (Reference to
specifications. BIS No.3114/1994.)
DIAMETER OF PIPE/Fittings/ valve in mm :
80mm to 750mm dia
800
900
1000
1100
1200
11a Lowering the RCC plain ended pipes carefully into the trench laying them true to
alignment and gradient, jointing RCC pipes with cement joints including curing, the
cost of jointing materials i.e., Cement Mortar (1:1.5), hemp yarn etc., and testing
including filling with water with a water lead up to 500 metres excluding cost of rubber
rings as per BIS No.783/85.
a G.I. PIPES :
DIA in mm
15mm to 150mm
b Lowering, Laying, jointing of PVC/HDPE/MDPE pipes as per BIS No.7634 part-III/75
for PVC and BIS No.7634 part-II/75 for HDPE pipes including earth work excavation
and testing to hydralic test pressure including cost of water with a water lead of 500m
etc., complete.
DIA in mm
20
25
32
40
50
NOTE :- (i) The above rates are applicable for the works in istrict only.
(ii) If the depth of excavation is more than 0.5 m separate rates to be worked out.
13 Lowering and laying in ready made trench true to alignment and gradient, jointing, and
testing of Stone ware pipes including cost of jointing material such as cement mortar
(1:1) proportion and hemp yarn but excluding cost and conveyance of pipe.
(Reference to specifications BIS No. 6530/72)
DIA of Pipes in mm .
100mm to 450mm
14 Lowering, laying, jointing and testing to hydraulic test pressure including cost of
water with minimum water lead of 500m for UPVC pressure pipes in ready made
trenches true to alignment and gradient including all sundries but excluding cost &
conveyance of pipes from source of supply and jointing materials as per BIS No.7634 -
Part III - 1975
DIA of Pipes in mm .
63mm to 315mm
15 Laying and jointing of HDPE pipes in ready made trench by butt fusion welding as
per IS:7634 – part-II/1975 as amended from time to time to the alignment and
gradient and testing the pipeline to the required pressure.
Outer Dia of pipes in MM
63mm dia OD
75mm dia OD
90mm dia OD
110mm dia OD
125mm dia OD
140mm dia OD
160mm dia OD
180mm dia OD
200mm dia OD
225mm dia OD
250mm dia OD
280mm dia OD
315mm dia OD
355mm dia OD
400mm dia OD
450mm dia OD
NOTE:- For item 9 to 16 the element of testing charges is to be considered as
20% of the combined rate for laying, jointing and testing. This 20% shall be
released only after satisfactory testing of the pipe line to the required pressure.
16 Lowering, keeping in position and fixing C.I. sluice valves (with cap / with hand wheel &
Reflex valves) excluding cost of bolts, nuts, rubber insertion, sluice valve and tail
pieces
Dia of Valve in mm.
80mm to 600mm
17 Labour charges for fixing Air valves including boring the mains and threading the bore
fixing nipple etc., complete.
Dia of Air valve in mm.
25
40
50
80
18 Labour charges for fixing Kinetic Air Valves with isolating Sluice valves, Double Air
valves/ Air Cushion valve excluding cost of jointing materials such as bolts, nuts and
rubber insertions etc., complete.
Dia of Air valve in mm.
80mm dia (Double Air valves)
100mm dia (Double Air valves)
125mm dia (Double Air valves)
150mm dia (Double Air valves)
200mm dia (Double Air valves)
19 Uprooting C.I./ DI Pipes by melting the lead, loosening the joints, scraping the pipes,
hoisting and keeping within a lead of 10 m but excluding earth work excavation and
refilling.
80mm to 600mm
20 Uprooting of RCC pipes including breaking the collars, loosening the joint, separating
the pipes, hoisting and keeping within a lead of 10 m but excluding earthwork
excavation and refilling.
100mm to 300mm
21 Removing old G.I. pipes and specials / fittings and cleaning, scraping the pipes,
hoisting and keeping with in 50m lead but excluding earth work excavation of trenches
and refilling.
Dia of Pipes in mm
15mm to 50mm
22 Cutting C.I./ DI Pipes without water in mains. Dia of pipes in mm.
Dia of Pipes in mm
80mm to 600mm
700mm dia
750mm dia
800mm dia
900mm dia
1000mm dia
1100mm dia
1200mm dia
23 Cutting A.C. Pipes without water in mains. Dia of pipes in mm.
Dia of Pipes in mm
80mm dia
100mm dia
125mm dia
150mm dia
200mm dia
250mm dia
300mm dia
350mm dia
400mm dia
450mm dia
500mm dia
600mm dia
24 Drilling and tapping CI/ DI / GI Main and fixing brass screw down ferrule and plug.
10 mm to 20mm
25 mm to 40mm
6 25 Cutting road surface including stacking of excavated materials for pipe line trench work.
a) Cutting open B.T. road surface (as well as asphalt concrete up to 75 mm thick)
including water bound macadam
b) Cutting open C.C. road surface
c) Cutting open water bound macadam road including soiling
26 Bailing out water.(For PH item)
a) Bailing out water from the pipe line trenches with oil engine driven pump sets,
including hire charges, fuel charges and wages for Driver and Helper.
b) Bailing out water from the pipe line trenches with Electric Driven pump set including
hire charges, current charges and wages for
Driver and Helper.
NOTE:- The rate is payable on the total H.P. hours ignoring fractions less than 0.5
HP hour and rounding off 0.5 HP hour or more to the next higher integer.
7 30 Laying and jointing perforated RCC pipes inclusive of bailing out water and
jointing with cement fillets and all other incidental charges for infiltration gallery
inclusive of bailing out water by pumping to keep the trench reasonably dry to facilitate
the work excluding cost of perforated pipes and collars.
per every 25 mm dia/Per.
7 31 Centering and scaffolding charges for RCC members including all materials
and labour charges for forming and dismantling.
a) for R C C Elevated Service Reservoir of staging up to 15 metre below L W L.
33 Labour charges for fixing ventilating shafts complete with all accessories.
34 Labour charges for fixing water closets including fixing of foot rests (for all sizes).
35 Labour charges for fixing of flushing cistern including fixing of flush pipes, lead pipe,
jointing etc., complete
36 Labour charges for fixing wash hand basin including fixing of inlet and waste pipe
connections etc., complete
37 Fixing urinal with inlet and waste pipe connections etc., complete.
38 Refilling the trench for pipe line with excavated earth including watering and
tamping etc., complete
39 a) Extra allowance for isolated scattered works viz., valve pits /chambers, public
fountains, meter pits and manholes, delivery cistern etc., complete.
39 b) Repairs to the existing mains, interconnections, replacement of valves/specials
etc., including the cutting ,jointing, bailing out of water, drying, earth work
excavation etc., complete.
40 Removal of wet silt and sludge from sullage drains, with aid of baskets and vessels,
etc with initial lift of 3 m and lead of 50 m.
41 Well sinking in sandy and other loose soils under water either by manual labour, divers,
or dredgers, weighting the top of staining to assist sinking etc., including dewatering
and other incidental charges such as hire charges for mechanical equipment etc
Up to 2 m below GL/m
From 2 to 4 m below GL/m
From 4 to 6 m below GL/m
From 6 to 8 m below GL/m
From 8 to 10 m below GL/m
Note:-Below 10 m for every metre depth or part thereof add Rs.250/- per
m. For higher dia, observed data is to be prepared and got approved.
42 Sinking in Hard strata other than rock but in soils like limestone,gravel, clay under water
including, pumping dewatering, hire charges for mechanical equipment etc., complete.
7) The above rates shall be increased / decreased due to increase/decrease in the cost
of cement by
Basic rate x (Rc-4750)/4750 x 0.069
Rc = Rate of Cement (Rs per MT) at the time of preparation of estimate.
8) The above rates shall be increased / decreased due to increase/decrease in the cost
of Steel by
Basic rate x (Rs-47000)/47000 x 0.135
Rs = Rate of Steel (Rs per MT) at the time of preparation of estimate.
The above formula applicable only for preparation of estimate. The price adjustment
shall be adopted on the actual consumtion of Steel and Cement.
9) Rate inclusive of three coats of epoxy paint Food Grade of best quality to inner
surface of the Reservoir including roof.
9.b) Rate inclusive of 2 coats of weather proof emulsion painting for external surfaces,
lettering, all required fixtures, Pipes,Pipe specials, valves of DI material, Valve
chambers etc., for pipe connections including cost of pipes,specials and valves as per
departmental directions and drawings
10) The above rates adopted for a wind pressure upto "250 kg/sq m". For every 100
kg/sqm decrease in wind pressure, the rate shall be decreased by 5%
11).a. The Basic rate is adopted by considering the design for Seismic forces for
Zone-II only of seismic zones.
11.b). The basic rates shall be increased by 15 % for Zone-III of seismic zones.
ix) Construction of R.C.C valve chambers as per Standard Drawings with RCC cover
slab fixed with CI/DI manhole Frame & Cover with lock and Key arrangement.The Mix
shall not be less than VRCC M 20 grade with 150mm thick side walls, 150mm thick top
slab, 150mm thick base slab over base course of 100mm thick (1:4:8) prop.
x) Balcony of 1.00 m width at floor slab level / middle ring beam level by using Stainless
Steel pipe of grade 304 hand railing up to 1.20 m height, with top railing of 40mm dia
pipe & middle railing of 25mm dia and verticals with 40mm dia at an interval not more
than of 1.00m c/c.
xi) Water Level Indicator of reputed make – Digital type (1 No) and Conventional type
(1 No)
xii) Lightening Arrestor with all its accessories complete including earthing,with relevant
IS Codes - 1 No.
44 Rates for OHSRs/ELSRs including fixtures with a staging of 12 m for Zone-II
Seismic analysis.
a Up to 10,000 Litres capacity
b 15,000 Litres capacity
c 20,000 Litres capacity
d 40,000 Litres capacity
e 60,000 Litres capacity
f 1,00,000 Litres capacity
g 1,20,000 Litres capacity
h 1,50,000 Litres capacity
i 2,00,000 Litres capacity
j 2,50,000 Litres capacity
k 3,00,000 Litres capacity
l 4,00,000 Litres capacity
m 4,50,000 Litres capacity
NOTE:-1) For intermediate ranges proportional rates may be adopted.All VRCC shall
be in M30 grade design mix.
2)The above rates are applicable for Elevated Level Services Reservoirs / OHSRs with
RAFT FOUNDATION and a rate of Rs.4750/- per tonne for cement and Rs.47000/- per
tonne for steel. for the month of May 2018
3) For every metre of staging less than 12 m, the rate shall be reduced by Rs.0.05
paise per litre per every metre of difference in staging
4) For every metre of staging above 12 m , the rate shall be increase by Rs.0.10 paise
per litre per every metre of additional in staging
5)The above rates shall be increased / decreased due to increase / decrease in the
cost of cement by
Basic Rate x (Rc-4750)/4750 x 0.069
Rc = Rate of cement (Rs per MT) at the time of preparation of estimate
6)The above rates shall be increased / decreased due to increase / decrease in the
cost of steel by
Basic Rate x (Rs-47000)/47000 x 0.135
Rs = Rate of steel (Rs per MT) (Fe-500/500D/550D from Primary Producers) at the
time of preparation of estimate.
The above formula applicable only for preparation of estimate. The price adjustment
shall be adopted on the actual consumtion of Steel and Cement.
7) Rate inclisive of three coates of epoxy paint to inner surface of the reservoir
including roof dome.
8) The above rates be adopted for estimate purposes for construction of ELSR for a
finished work including 2 coats of wheather proof emulsion painting for external
surfaces, lettering, all required fixtures, pipes, bends, valves etc., for pipe connections
but excluding cost of pipes,bends and valves as per departmental designs and
drawings.
9) The above rates are applicable for wind pressures upto 250 kg / sq m .For
decrease in wind presure the rate has to be decreased by 5% per every
100kg/sqm. If the ELSR / OHSR is to be designed for seismic forces also, cost
shall be arrived by working out detailed quantities based on the designs
10) For Tribal/Agency area, the above rates shall be increased by 5%.
11) If the ELSR is to be designed for seismic forces a) The above rates are applied
upto Zone-II of Seismic Zone. b) for Zone-III earth quake the above rates are to be
increased by 15%.
12) Fixtures include :
a) RCC or Aluminium ladder inside 0.60 m wide.
b) spiral staircase on the outside shall be provided upto 200KL ELSR. Above 200KL
ELSR Capacity dog legged staircase shall be provided with staircase flight width of
1.0mts and landing width of 1.20mts with S.S railing upto 1.0 height.
c) Lightening arrestor, including conductor and earthing etc.
d) RCC ventilators with copper or stainless steel fly proof mesh.
e) D.I Manholes frame and cover 0.60x0.60 m as per IS specifications (light duty) - 2
Nos.
f) Water level indicator of good quality with ebonite/ copper float approved pattern - 1
No.
g) The ladder shall be with M.S ladder and Verticals with HDPE of 10kg/Sqcm shall be
provided for single column OHSRs only.
h) Minimum staging for all ELSR/OHSR shall be 12.0mts.
i) The increase in staging shall be at 1.0mt interval.
j) The railing provided to the gallery and stair case shall be with stainless steel of grade
304 for a height of 1.00mts.
k). The dog legged staircase shall be enclosed with brick/CRS wall on three sides and
front side with M.S collapsible gate upto 1st brace level from ground level to prevent
unauthorized entry.
l). D.I swan neck ventilators shall be provided in top dome and slab.
m). The above rates are exclusive of all inlet, out let conenction and valves. All valves
near inlet, out let and for scour of ELSRs shall be D.I valves.
n) The above rates are exclusive of all inlet, outlet connection and valves. All
valves near inlet, out let and for scour of ELSRs shall be D.I valves.
45 Construction of Rapid Gravity Filtration Plant including all civil, mechanical and
electrical works using sand as filter media, duly following relavant IS codes in
the design of plant components including trial running for 90 days etc., complete
1) 2.0 Mld
2) 5.0 Mld
3) 10.0 Mld
4) 20.0 Mld
5) 30.00 Mld and above
NOTE :-
a) For intermediate ranges proportional rates may be adopted
b) The above rates are arrived with base rate of Cement Rs.5500/- per MT & Steel for
Rs.47000/- per MT for the month of May 2016
c)The above rates shall be increased / decreased due to increase / decrease in the
cost of cement by
Basic Rate x (Rc-4750)/4750 x 0.069
Rc = Rate of cement (Rs per MT) at the time of preparation of estimate only
d)The above rates shall be increased / decreased due to increase / decrease in the
cost of steel by
Basic Rate x (Rs-47000)/47000 x 0.135
Rs = Rate of steel (Rs per MT) (Fe-500/500D/550D from Primary Producers) at the
time of preparation of estimate.
e) For rural areas an extra allowance of 10% shall be given on basic rate.
The components of the Filtration Plant are as follows.
A) Civil Works: (All works of VRCC Shall be in M30 design mix)
1). Stilling Chamber and Areation cascade
2) Settling chamber shall be provided for 10 MLD and above capacities of
WTP for a minimum of 1 hour capacity
3). Raw water channel with Stainless Steel Weir of SS304L Grade material and also
with digital flow meters
4) Flash Mixer chamber with Flash mixing arrangements including SS shaft & SS
Blades with gear wheel arrangements etc, Using 304L Grade Steel.
5) Clariflucculator / Flocculation tanks with the components of central driven circular
clarifier with scrapper & bridge arrangements made with Stainless Steel Grade 304 L
tubes /angulars for durability & chemical resistant with wheel arrangements etc,.
6) Filter house, Chemical house, Alum store, Laboratory room , Chlorination plant room,
toilet etc. (All structures shall be provided RCC roof only).Chemical house &
Chlorinator rooms are to be isolated.
7) Wash water tank of suitable capacity shall be constructed at minimum clearance of
2.00m, above the roof slab of Filter beds / any other structure.
8) All the Doors and Windows shall be of Aluminium.The entrance door shall
be minimum size of 2.40 X 2.40 mts.
9) All pipes and valves in Plant shall be of D.I. materials. All the Connecting pipes of
the plant coponents such as from Flash mixer to Clarifloculator/ Clarifier/Flocculation
tank, to Filter beds, sludge disposal pipes shall be of D.I. material. The size of sludge
disposal pipe shall be minimum of 450 mm dia with D.I D/F pipe.
10) The Pipe gallery way for Clear water/ Back wash water/ pipe connections shall be
suffuiciently spaced for easy operation & maintenance and inspection .
11) The bottom level of the wash water control chamber must be above G.L so as to
dispose the wash water and sludge from Clariflocculator by gravity to disposal point.
Additional specificaions
12) Railing for all the components (Clarifloculator, Filter House, Staircase etc,.) shall be
provided with Stainless Steel of grade 304 for a height of 1.00m, with 40mm dia pipe
for top horizotals,25mm dia for middle row and 40mm dia verticals spaced at interval of
not more than 1.00m c/c.
13) Inspection / Path ways in filter beds : Middle pathway: Minimum of 1.50m,Side
pathway: Minimum of 1.20m.
14) Flooring in the buildings (Filter house, Chemical House, Chlorinator Room,
Laboratory) shall be provided with Non-skid tiles of approved make & quality , as per
standard specifications.
15) The basement of the Filtration plant building shall be minimum of 1.20m above the
existing nearby Road top level.
16) Minimum head room of 2.00m shall be provided , at the alum mixing chambers in
alum store for inspection & maintenance
17) The minimum width of entrance hall for the Filter House shall be 4.50m , and
Laboratory, of min size .of 3.30 X 4.50m .
18) High efficient Air Blowers shall be installed to the design requirement with low noise
pollution , environmental pollution as per PCB guide lines & Testing of blowers as per
I.S norms at site.
19) UPVC pipes shall be provided for water drain.Filter pipe manifolds shall be
assembled with HDPE pipes.
20) Alum storage capacity shall be designed for minimum period of 90 days.
Consumables shall be provided for 2115 Running Hours of WTP.
21) Chlorinator : Vaccum type chlorinator shall be provided with following
specifications:
a) Vaccum operated solution feeding type Vaccum Regulator, Rotometer, Rate setting
Valve, built-in NRV, Gas Overflow out let by manifolding to mount the system with the
unit.
b) The unit shall consists of Ejector with necessary accessories such as Check Valve,
Drain Valve and Vacum relief Valves - for control of chlorinator dosage.
c) The Accessories and manifolds shall be chlorine resistant and made of corbon steel
seam less pipes, copper tube with brass fittings of suitable size & dimensions, with
diaphram sealed chlorine pressure gauge arrangements
10) Instruments :
- Chlorine Leak Detector Double Alarm sensor with Audio alarm in Building
& Panel : Make : Toshcon Jesco , Alarm Pre Set Level : 2 PPM (low) , 5 PPM
(High) , Type : Electrochemical , Display : 7 Segment LED , Cabinet :
Polycarbonate , Transmission Output : 4-20 mA
11) Safety Equipments :
- Cannsiter Type Respirator with full face Coverage : Make : Grouptech ,
Accessories : Full Face Mask
-Ammonia Bottle with leak torch : Quantity : 500 ml , Make : Merck/Equ
- Gloves , Rubber Boots , apron , Google and Helmet : Size : Universal
- Emergency Eye wash shower and Basin : Make : J.K Enterprises, MOC: G.I
, ABS Plastic , Required Water Pressure : 1 Bar , Inlet Connection : 1.25 ‘’ - Self
Contained Breathing apparatus Complete with Warning Whistle ( Type
Full face) : Make : Group Tech , Accessories : Storage Bag, Carrying Harness
, Demand Valve type Full face mask , Warning Whistle , Duration : 30 mins
- Emergency Kit B : Make : J.K Enterprises , Type : B for Tonner
8) Spares & Tools and the same shall be handed over after 2 years defect
liability period.
9) Gaseous Chlorination with cylinders has to provided with protection measures.
C) Electrical Equipment
1) Necessary power supply wiring to motors and switches bus bar connections
as per IE Rules
2) Internal wiring and illumination and fittings and fixtures for internal and
external lighting exhaust fans, ceiling fans etc.
3) Erecting mechanical and electrical equipment, trial run for 90 days 23.50
hours per day testing the treated water for efficient standards and maintenance
of records and imparting training to staff
4) Supply of 6 - Seap of completion plans and maintenance manual and
brochures.
5) All cables shall be with of copper material, Cable ducts shall be covered
with MS / Aluminum chequed plate
6) Yard lighting shall be provided at 6 locations with required fixtures
D ) Equipment for Flow measurements
1) Equipment for Flow of Conductivity, Turbidity, Ph value, Residual Chlorine with
recording & data storage facility (Computer based) & Alarm by SMS or other methods.
2) Off - Site Supervisory and Data Acquisition (OSSADA) system for Raw water &
Clear water flows by installing Digital Flow meters to measure the flows at Raw water
Channel and at each filter bed individually and combined for measuring the quantities
of water treated with a facility to record and store the readings & also to send
messages to the assigned designatories about the variations/ defficiencies in the flow
including alerts for back wash requirements of filter beds, and recovery of data for the
past 360 days. All the Digital Flow Meters & Pressure Gauges shall be provided of
standard approved make. The equipment shall have the following specifications, but
not limited to:
Hardware:
i) Wall mounted Sensor House for measuring Raw water & Clear water flow from Filter
bed out lets with accessories consists of
ii) Electrode Type: General type, Scraper type or replaceable type Electorde made with
material of SS external Ultra Touch Sensors as per requirement.
iii) Customised Application Requirement : Sensors with Interface logic control board
with serial interfaces, including accessories such as Add-on port, external DC Power
Socket, On - sensor Board Buffer, Timer, RS485 Communication, Analog to Digital
Sensing Sensor Circuit, 32 Sensors Sensing Tags, Interval Power Supply System ,
LCD 16c/2L, Filter Bed Working Status Indication LED, Filter Bed Wash Indication
Button and memory of Data Storage for 30Days , status of Filter Bed Level indicator,
Rating, Reading on LCB Display, Menu Driven Data for sending to Onsite Big Display,
operated with Battery Power of any reputed make or any equalent make.
iv) Customised Application Requirement: Power Sensors Interface logic control board
with support 8 Power Sensing tags, Central System Interfacing Communication, On -
board analog to Digit Convert Integrate Circuit of any reputed make or any equalent
make.
v) Customised Application Requirement: Centralized System with two serial interfaces,
3 Nos of Add-On ports, One external DC Power Socket, On - Board Buffer, On - Board
Timer, On - Board RS485 Communication, On - Board RS 232 Communication, On -
Board GPRS/GSM Module, On - Board Voice Chip, On - Board Power Sensing Module,
LCD 16c/2L, Filter Bed Wash Precaution Indication with Stop Button, Memory of Data
Storage for 30 Days, Total Bed Rating, Reading display on LCD Display, Menu Driven,
Menu Navigate Keypad, sendind data to the Web Server, Communication with GPRS ,
operated with Battery Power of any reputed make or any equalent make.
Software:
The software shall be designed with Web Domain with Data Base Server and Web
Name as per the directions of the Departmental Authorities
The application of Software for Web design & Desktop shall meet the following
requirements:
Onsite Display: Letters with size of 1.5’ seven Sigment LED Display with Interface for
each Filter Bed, for Onsite Display, by displaying the Bed Leves, Ratings, Readings in
3 Columns , for each bed of the plant in succesive rows and cumulative results at the
bottom of the screen.
Off Site Display: Letters with size of 1.5’ seven Sigment LED Display with Interface
GPRS/GSM Modules Offsite Display, with Display of Bed Total Rating, Total
Cumulative Reading as specified on On-site Display Features.
The system shall have also the features of Onsite Bed Wash Voice Precautions for
Bed Levels, Readings, Ratings, Bed Capacity Readings and Ratings and Bed Low
Level Triggering, before & after Bed wash.
The software shall also have the features of sending messages to the mobiles of the
Departmental designatories indicating Bed Low Levels,Power Supply timings, Bed
Wash timings and its status, Power Supply timings and its status Grid View Table,
Motor Working time and its status Grid View Table, all trigger events and schedule
information and including all Snap View Reports, all Daily, Monthly, Yearly Reports, all
Power Working Reports, all Power Events Information etc,.
JUNE 2018-19
325.00 1 cum
40.00 1 Kg
50.00 1 Kg
200.00 1 sqm
4750.00 1 tonne
4650.00 1 tonne
4500.00 1 tonne
53.00 1 Kg
760.00 1 cum
990.00 1 cum
890.00 1 cum
510.00 1 cum
42.00 1 Each
600.00 1 kg
20.00 1 Each
28.00 1 Each
119.00 1 ltr
8.00 1 Rm
17.00 1 Each
7.00 1 Rm
30.00 1 Rm
15.00 1 Each
8.00 1 Each
6.00 1 Each
5.00 1 Each
55.00 1 kg
70.00 1 kg
75.00 1 kg
1 cum
570.00
760.00 1 cum
34.00 1 sqm
42.00 1 sqm
51.00 1 sqm
675.00 1 Rm
80.00 1 Rm
128.00 1 Rm
211.00 1 Rm
245.00 1 Rm
422.00 1 Rm
84.00 1 kg
51000.00 1 tonne
54500.00 1 tonne
32.00 1 sqm
270.00 1 Each
72.00 1 kg
62000.00 1 cum
260.00 1 Rm
519.00 1 Rm
34.00 1 Each
26000.00 1 cum
13.00 1 Each
16.00 1 Each
18.00 1 Each
490.00 1 Each
84.00 1 sqm
118.00 1 sqm
160.00 1 sqm
70.00 1 kg
200.00 1 cum
85.00 1 ltr
40.00 1 cum
41.00 1 Rm
415.00 1 Rm
152.00 1 Rm
47000.00 1 tonne
38.00 1 Each
25.00 1 Each
1 sqm
200.00
1 sqm
150.00
1 cum
185.00
360.00 1 cum
1 tonne
43000.00
43000.00 1 tonne
55.00 1 kg
190.00 1 ltr
278.00 1 Kg
379.00 1 sqm
580.00 1 sqm
1 Each
23.00
1 Each
39.00
1 Each
59.00
1 cum
170.00
1 cum
340.00
79.00 1 kg
11.00 1 Each
35.00 1 Each
215.00 1 sqm
135.00 1 ltr
476.00 1 ltr
206.00 1 ltr
159.00 1 ltr
151.00 1 ltr
169.00 1 Rm
574.00 1 Rm
155.00 1 Kg
401.00 1 Ltr
206.00 1 Ltr
38.00 1 cum
1 cum
500.00
550.00 1 cum
6.00 1 Rmt
1 Bag
30.00
1 cum
200.00
3.00 1 sqm
71.00 1 Liter
200.00 1 cum
1 cum
65.00
R GATES & HOISTS FOR THE YEAR : 2018-19
S. Rate for 2018-19 UNIT
211.00 1 kg
363.00 1 kg
105.00 1 kg
312.00 1 kg
844.00 1 kg
844.00 1 kg
72.00 1 kg
207.00 1 kg
194.00 1 kg
156.00 1 kg
135.00 1 ltr
211.00 1 ltr
224.00 1 kg
148.00 1 kg
169.00 1 Rm
139.00 1 Rm
658.00 1 Rm
793.00 1 Rm
1266.00 1 Rm
1941.00
1097.00 1 Rm
1688.00
1603.00 1 Rm
2700.00 1 Rm
3544.00
2532.00 1 Rm
3376.00
253.00 1 kg
1 Each
17.00
23.00 1 Each
203.00 1 kg
167.00 1 kg
587.00 1 ltr
For 1 Each
establishing 1 Each
Electrical sub
stations at the 1 Each
projects sites 1 Each
wherever
necessary, the 1 Each
rates approved 1 Set
by
1 1000
APTRANSCO
may be 1mRm
followed.
rates approved
by
APTRANSCO
may be
followed. 1 Rm
1 Rm
1 Rm
2200000.00 1 Each
90000.00 1 Each
710000.00 1 Each
950000.00 1 Each
865000.00 1 Each
1085000.00 1 Each
1120000.00 1 Each
1370000.00 1 Each
5475000.00 1 Each
1200000.00 1 Each
4245000.00 1 Each
5425000.00 1 Each
530000.00 1 Each
30000.00 1 Each
56000.00 1 Each
15500.00 1 Each
150000.00 1 Each
145000.00 1 Each
260000.00 1 Each
255000.00 1 Each
2361000.00 1 Each
3855000.00 1 Each
90000.00 1 Each
1150000.00 1 Each
522000.00 1 Each
744000.00 1 Each
2120000.00 1 Each
34000.00 1 Each
24500.00 1 Each
60000.00 1 Each
55000.00 1 Each
190000.00 1 Each
100000.00 1 Each
1100000.00 1 Each
1350000.00 1 Each
90000.00 1 Each
1500000.00 1 Each
90000.00 1 Each
500000.00 1 Each
150000.00 1 Each
280000.00 1 Each
2280000.00 1 Each
70000.00 1 Each
14500.00 1 Each
13500.00 1 Each
16500.00 1 Each
15500.00 1 Each
780000.00 1 Each
450000.00 1 Each
590000.00 1 Each
85000.00 1 Each
17500.00 1 Each
52000.00 1 Each
925000.00 1 Each
3750000.00 1 Each
6380000.00 1 Each
653000.00 1 Each
1645000.00 1 Each
90000.00 1 Each
260000.00 1 Each
7650000.00 1 Each
450000.00 1 Each
1475000.00 1 Each
90000.00 1 Each
2240000.00 1 Each
90000.00 1 Each
56000.00 1 Each
260000.00 1 Each
2950000.00 1 Each
650000.00 1 Each
1440000.00 1 Each
90000.00 1 Each
48000.00 1 Each
375000.00 1 Each
14300000.00 1 Each
190000.00 1 Each
10200000.00 1 Each
190000.00 1 Each
490000.00 1 Each
8861.00 1 Each
9283.00 1 Each
10970.00 1 Each
11814.00 1 Each
2110.00 1 Rm
4641.00 1 Each
5823.00 1 Each
675.00 1 Each
24051.00 1 Each
47257.00 1 tonne
5063.00 1 Each
4219.00 1 Each
10127.00 1 Each
11814.00 1 Each
15190.00 1 Set
224.00 1 Rm
155.00 1 Rm
217.00 1 Rm
370.00 1 KVA /
72.17 1 month
ltr
10.00 1 Kwhr
0.00 %
0.00 %/
annum
%/
0.90
230.00 1 annum
ltr
79.43 1 ltr
84.00 1 kg
As per RTA 1 annum
94.00 1 kg
30.00 1 ltr
23.00 1 kg
20.00 LS
143.00 1 Rm
16.00 LS
17.00 LS
17.00 LS
17.00 LS
17.00 LS
17.00 LS
14250.00 1 Each
232.00 1 Kg
7800.00 1 Each
150.00 LS
ES AND HOISTS FOR THE YEAR : 2018-19
192000.00 1 Each
104000.00 1 Each
73000.00 1 Each
62000.00 1 Each
29000.00 1 Each
20000.00 1 Each
10500.00 1 Each
170.00 1 Kg
27000.00 1 Each
200000.00 1 Each
32500.00 1 Each
56000.00 LS
4620.00 1 Each
2018-19
152.00 1 Cum
152.00 1 Cum
156.00 1 Cum
129.00 1 Cum
179.00 1 Cum
112.00 1 Cum
131.00 1 Cum
146.00 1 Cum
148.00 1 Cum
129.00 1 Cum
241.00 1 Cum
1 Cum
1 Cum
67.00
249.00 1 Cum
179.00 1 Cum
1 Cum
1642.00
1 Cum
67.00
29.00 1 each
35.00 1 each
Based on detailed
analysis as per
MoRTH Data
67.00 1 each
97.00 1 each
67.00 1 each
8.00 1 each
9.00 1 each
505.00 1 Cum
657.00 1 Cum
781.00 1 Cum
870.00 1 Cum
830.00 1 Cum
505.00 1 Cum
433.00 1 Cum
398.00 1 Cum
360.00 1 Cum
289.00 1 Cum
236.00 1 Cum
1 Cum
67.00
1 Cum
25%
1 Cum
9.90
1 Cum
17.00
117.00 1 Cum
105.00 1 Cum
83.00 1 Cum
74.00 1 Cum
69.00 1 Cum
485.00 1 Cum
485.00 1 Cum
620.00 1 Cum
700.00 1 Cum
821.00 1 Cum
790.00 1 Cum
520.00 1 Cum
440.00 1 Cum
400.00 1 Cum
360.00 1 Cum
290.00 1 Cum
1 Cum
67.00
1 Cum
25%
1 Cum
9.90
1 Cum
17.00
367.00 1 Cum
367.00 1 Cum
344.00 1 Cum
344.00 1 Cum
278.00 1 Cum
278.00 1 Cum
273.00 1 Cum
162.00 1 Cum
162.00 1 Cum
143.00 1 Cum
143.00 1 Cum
135.00 1 Cum
135.00 1 Cum
111.00 1 Cum
111.00 1 Cum
87.00 1 Cum
87.00 1 Cum
96.00 1 Cum
71.00 1 Cum
90.00 1 Cum
1 Cum
67.00
63.00 1 Cum
39.00 1 Cum
52.00 1 Cum
40.00 1 Cum
46.00 1 Cum
40.00 1 Cum
34.00 1 Cum
30.00 1 Cum
1 Cum
16.00
1 Cum
98.00 1 Cum
77.00 1 Cum
485.00 1 Cum
760.00 1 Cum
570.00 1 Cum
570.00 1 Cum
1 Cum
33.00
Based on detailed
analysis as per data
89.00 1 Cum
893.00 1 Cum
1 Kg
detailed 1 Sqm
analysis as 1 Sqm
per 1 Sqm
1 Sqm
3.50
18.00 1 Each
42.00 1 Each
44.00 1 Each
46.00 1 Each
23.00 1 Each
33.00 1 Each
1 Each
23.00
29.00 1 Each
29.00 1 Each
44.00 1 Each
71.00 1 Each
1 Each
23.00
31.00 1 Each
39.00 1 Each
2.00 1 Sqm
2.90 1 Sqm
1 Sqm
3.30
1 Sqm
1.80
3.60 1 Sqm
3.10 1 Sqm
3.40 1 Sqm
3.50 1 Sqm
4.80 1 Sqm
1 Sqm
1.30
59.00 1 Cum
as per MoRTH
118.00 1 Rmt
124.00 1 Rmt
143.00 1 Rmt
133.00 1 Rmt
144.00 1 Rmt
157.00 1 Rmt
84.00 1 Rmt
105.00 1 Rmt
131.00 1 Rmt
61.00 1 Kg
8.30 1 Rmt
10.00 1 Rmt
66.00 1 Liter
17.00 1 Sqm
73.00 1 Kl
98.00 1 Kl
ms 2018-2019
Unit
To follow the
relevant items
of Irrigation
work items as
per Standard
data
To follow as per
Standard data
585.00 1 Rmt
759.00 1 Rmt
987.00 1 Rmt
1216.00 1 Rmt
1446.00 1 Rmt
To follow as per
Standard data
13178.00 1 Joint
14758.00 1 Joint
16315.00 1 Joint
17851.00 1 Joint
To follow as per
Standard data 1 Joint
To follow as per
Standard data 1 Joint
5645.00 1 Joint
6698.00 1 Joint
7754.00 1 Joint
8834.00 1 Joint
9945.00 1 Joint
23.00 1 Rmt
To follow as per 1 Rmt
Standard data
372.00 1 Rmt
446.00 1 Rmt
534.00 1 Rmt
639.00 1 Rmt
To follow as per
Standard data 1 Rmt
36.00 1 Rmt
37.00 1 Rmt
42.00 1 Rmt
42.00 1 Rmt
42.00 1 Rmt
To follow as per
Standard data 1 Rmt
To follow as per
Standard data 1 Rmt
39.00 1 Rmt
43.00 1 Rmt
48.00 1 Rmt
59.00 1 Rmt
70.00 1 Rmt
74.00 1 Rmt
80.00 1 Rmt
88.00 1 Rmt
96.00 1 Rmt
106.00 1 Rmt
112.00 1 Rmt
124.00 1 Rmt
192.00 1 Rmt
214.00 1 Rmt
238.00 1 Rmt
265.00 1 Rmt
To follow as per
Standard data 1 Each
267.00 1 Each
311.00 1 Each
462.00 1 Each
506.00 1 Each
550.00 1 Each
To follow as per
Standard data
35.00 1 No
35.00 1 No
35.00 1 No
35.00 1 No
37.00 1 No
59.00 1 No
59.00 1 No
74.00 1 No
81.00 1 No
102.00 1 No
113.00 1 No
124.00 1 No
To follow as per 1 No
Standard data 1 No
1042.00 1 Cum
2169.00 1 Cum
267.00 1 Cum
57.00 1 HP/ho
ur
42.00 1 HP/ho
ur
46.00 1 Rmt
3953.00 1 Sqm
473.00 1 Sqm
2986.00 1 Sqm
2659.00 1 Sqm
1628.00 1 Sqm
3238.00
893.00 1 Sqm
1332.00 1 Sqm
1463.00 1 Sqm
4141.00
525.00 1 Sqm
162.00 1 Cum
49.00 1 Cum
1 Each
1 Each
10 Cum
317.00 1 Cum
Observed Data
17.50 1 litre
14.23 1 litre
13.14 1 litre
12.42 1 litre
11.77 1 litre
5500
81.17 1 litre
0.00 1 litre
48.27 1 litre
38.36 1 litre
28.51 1 litre
25.20 1 litre
22.02 1 litre
20.02 1 litre
18.88 1 litre
18.30 1 litre
17.72 1 litre
15.49 1 litre
13.80 1 litre
4.81 1 litre
3.85 1 litre
3.30 1 litre
2.82 1 litre
2.49 1 litre
//
ATTESTE
D //
Page 941 of 2191
Basic Rate of
Labour wide MA on LC @ Total
SNo. CATEGORY OF WORKER Pg.
5 to 9 20%
I. SKILLED CATEGORY:
1 Bar bender 565.00 113.00 678.00
2 Black smith / Tin smith / Rivetor 470.00 94.00 564.00
3 Blaster 565.00 113.00 678.00
4 Carpenter Cl- I 565.00 113.00 678.00
5 Electrician ( Licensed ) 540.00 108.00 648.00
6 Fitter Cl- I 540.00 108.00 648.00
7 Floor Polisher / Tile Layer 470.00 94.00 564.00
8 Foreman 540.00 108.00 648.00
9 Gauge reader 470.00 94.00 564.00
10 Maistry / Work Inspector with Non-technical Qualification 113.00 678.00
565.00
SSLC/SSC/HSC
11 Mason Cl- I / Brick layer Cl- I 470.00 94.00 564.00
12 Mechanic Cl- I 500.00 100.00 600.00
13 Operator Air compressor / DG set 500.00 100.00 600.00
14 Operator Batching plant 540.00 108.00 648.00
15 Operator Bus/Ambulance/ Lorry/ Tanker 540.00 108.00 648.00
16 Operator Concrete / Asphalt mixer 500.00 100.00 600.00
17 Operator Concrete / Asphalt paver 500.00 100.00 600.00
18 Operator Concrete pump / Placer/ ice plant 500.00 100.00 600.00
19 Operator Core drilling machine 540.00 108.00 648.00
20 Operator Crane/ Tower crane/ Cable way 540.00 108.00 648.00
21 Operator Drilling jumbo / Loco / Winch 500.00 100.00 600.00
22 Operator Grouting/ Guniting/ Shotcreting 500.00 100.00 600.00
23 Operator Jackhammer/Pneumatic tamper 500.00 100.00 600.00
24 Operator Pump / Ventilation fan 500.00 100.00 600.00
25 Operator Lathe/Drilling/Shearing machine 540.00 108.00 648.00
26 Operator Bending / Planing machine 500.00 100.00 600.00
27 Operator Road roller 540.00 108.00 648.00
28 Operator Shovel / Scraper / Dozer 540.00 108.00 648.00
29 Operator Spillway / Sluice gate 500.00 100.00 600.00
30 Operator Crusher / Conveyor / Mucker 500.00 100.00 600.00
31 Operator Tipper / Dumper / Transit mixer 540.00 108.00 648.00
32 Operator Concrete vibrator 500.00 100.00 600.00
33 Operator Vibratory plain / pad foot roller 500.00 100.00 600.00
34 Operator Wagon drill / Drifter 540.00 108.00 648.00
35 Painter Cl- I 540.00 108.00 648.00
36 Plumber / Pipe fitter 540.00 108.00 648.00
37 Sarang / Khalasi 500.00 100.00 600.00
38 Spun pipe moulder 500.00 100.00 600.00
39 Stone chiseller CI- I / Stone cutter Cl- l 500.00 100.00 600.00
40 Struct. steel Fabricator / Marker / Erector 580.00 116.00 696.00
41 Welder / Gas Cutter 500.00 100.00 600.00
42 Welder (X-ray quality) 540.00 108.00 648.00
HIRE CHARGES OF PLANT & MACHINERY( IRRIGATION ) FOR THE YEAR : 2017-18
S.No Description of machinery Unit Hire charge in Fuel charge
Rs in Rs
1 2 3 4 5
1 Agitator car / Transit mixer 2 cum Hour 739.60 1091.60
2 Air compressor 5 cmm ( electric ) Hour 101.00 302.10
3 Air compressor 7 cmm ( diesel ) Hour 228.50 893.10
4 Air compressor 7 cmm ( electric ) Hour 123.00 402.80
5 Air compressor 8.5 cmm ( diesel) Hour 260.90 1116.40
HIRE CHARGES OF PLANT& MACHNIERY FOR ROAD & BRIDGE WORKS FOR THE YEAR 2017
Note: The above hire charges of machinery & plant includes crew, oils, conveyance of machinery to site and all oth
charges.
new
direct rate
EAR : 2017-18
Crew Total in Rs
Charge in
Rs.
6 7
308.90 2140.10
185.30 588.40
237.10 1358.70
185.30 711.10
237.10 1614.40
185.30 848.20
197.60 1441.00
257.40 2661.20
370.60 608.10
370.60 1138.50
370.60 1329.60
148.20 320.80
0.00 5.40
0.00 15.20
0.00 5.30
247.00 397.50
247.00 341.30
247.00 534.30
247.00 423.60
474.20 800.60
197.60 1292.60
308.90 920.70
148.20 1007.20
148.20 1431.80
185.30 1214.80
124.80 232.20
93.60 141.20
124.80 337.70
93.60 189.30
124.80 567.40
93.60 283.90
386.10 698.90
197.60 616.70
247.10 1326.60
0.00 99.80
296.40 375.30
247.00 352.90
148.20 1576.10
370.50 390.40
177.80 205.00
177.80 191.80
177.80 216.70
177.80 196.90
237.10 479.20
154.40 374.20
97.50 264.90
296.40 315.70
0.00 11.20
0.00 11.80
247.10 1342.30
257.40 1804.40
257.40 2967.90
0.00 79.40
193.10 1004.40
0.00 66.60
205.90 1245.80
0.00 4737.50
193.10 969.20
193.10 1127.90
210.60 276.70
32.30 221.90
296.40 2878.90
308.90 486.40
193.10 961.90
0.00 122.40
296.40 638.70
345.00
584.10 3577.30
584.10 2766.80
118.70
Sl NAME OF THE STRUCTURAL Material Hire Labour charges Centring Charges for
MEMBER charges 2018-19
1 2 3 4 5
HIRE CHARGES FOR CENTERING & SCAFFOLDING - Unsupported Height upto 3.66 M
Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc.,
K SLABS - above 300 mm thick Rs. 254.00 Rs. 232.00 Rs. 486.00
L WAFFLE - (GRID) SLABS (Rib Rs. Rs. 1641.00
Beams with Slabs) 858.00 Rs. 783.00
M PERGOLA SLABS (Only Rib Beams) Rs. 602.00 Rs. 549.00 Rs. 1151.00
N ARCH BEAMS - up to 1.5 M Span Rs. 2370.00 Rs. 2163.00 Rs. 4533.00
O ARCH BEAMS - above 1.5 M Span Rs. 2404.00 Rs. 2193.00 Rs. 4597.00
P DOME SLABS Rs. 3833.00 Rs. 3496.00 Rs. 7329.00
Q HELICAL STAIRCASES Rs. 292.00 Rs. 267.00 Rs. 559.00
R SHEAR WALLS, RCC WALLS,
WATER TANK WALLS Rs. 1206.00 Rs. 1653.00 Rs. 2859.00
Cent'g--18-19
Cent'g--18-19
L PERGOLA SLABS (Only Rib Beams) Rs. 403.00 Rs. 425.00 Rs. 828.00
M ARCH BEAMS - up to 1.5 M Span Rs. 1586.00 Rs. 1675.00 Rs. 3261.00
N ARCH BEAMS - above 1.5 M Span Rs. 1609.00 Rs. 1698.00 Rs. 3307.00
O DOME SLABS Rs. 2566.00 Rs. 2708.00 Rs. 5274.00
P HELICAL STAIRCASES Rs. 196.00 Rs. 207.00 Rs. 403.00
Q SHEAR WALLS, RCC WALLS, Rs.
WATER TANK WALLS
Note : For Shear Walls, RCC Walls, Water Tank walls the centring charges are for both faces (back and front)
HIRE CHARGES FOR ACCESS SCAFFOLDING - up to 3.66 M using Casuarinas Ballies, Bamboos, Wooden Reape
Runners, Wood Posts, Wall Plates etc., for BRICK MASONRY/ STONE MASONRY/ WALL PUTTY/ TEXTURE PAINTS
- 1 sqm
Cent'g--18-19
Cent'g--18-19
HIRE CHARGES FOR ACCESS SCAFFOLDING - up to 3.66 M using Casuarinas Ballies, Bamboos, Wooden Reape
Runners, Wood Posts, Wall Plates etc., for PLASTERING to WALLS - 1 sqm
A 1st - Floor Rs. 1.03 Rs. 7.95 Rs. 8.98
B 2nd - Floor Rs. 1.03 Rs. 11.38 Rs. 12.41
C 3rd - Floor Rs. 1.03 Rs. 14.80 Rs. 15.83
D 4th - Floor Rs. 1.03 Rs. 18.24 Rs. 19.27
E 5th - Floor Rs. 1.03 Rs. 21.67 Rs. 22.70
F 6th - Floor Rs. 1.03 Rs. 25.11 Rs. 26.14
G 7th - Floor Rs. 1.03 Rs. 28.54 Rs. 29.57
H 8th - Floor Rs. 1.03 Rs. 31.96 Rs. 32.99
I 9th - Floor Rs. 1.03 Rs. 35.40 Rs. 36.43
J 10th - Floor Rs. 1.03 Rs. 38.83 Rs. 39.86
K 11th - Floor Rs. 1.03 Rs. 42.26 Rs. 43.29
L 12th - Floor Rs. 1.03 Rs. 45.69 Rs. 46.72
M 13th - Floor Rs. 1.03 Rs. 49.12 Rs. 50.15
N 14th - Floor Rs. 1.03 Rs. 52.55 Rs. 53.58
O 15th - Floor Rs. 1.03 Rs. 56.00 Rs. 57.03
HIRE CHARGES FOR STAGE SCAFFOLDING - up to 3.66 M using Casuarinas Ballies, Bamboos, Wooden Reaper
Runners, Wood Posts, Wall Plates etc., for CEILING PLASTERING - 1 sqm
A 1st - Floor Rs. 2.46 Rs. 15.91 Rs. 18.37
B 2nd - Floor Rs. 2.46 Rs. 22.57 Rs. 25.03
C 3rd - Floor Rs. 2.46 Rs. 29.23 Rs. 31.69
D 4th - Floor Rs. 2.46 Rs. 35.90 Rs. 38.36
E 5th - Floor Rs. 2.46 Rs. 42.56 Rs. 45.02
F 6th - Floor Rs. 2.46 Rs. 49.22 Rs. 51.68
G 7th - Floor Rs. 2.46 Rs. 55.89 Rs. 58.35
H 8th - Floor Rs. 2.46 Rs. 62.55 Rs. 65.01
I 9th - Floor Rs. 2.46 Rs. 69.22 Rs. 71.68
J 10th - Floor Rs. 2.46 Rs. 75.88 Rs. 78.34
K 11th - Floor Rs. 2.46 Rs. 82.54 Rs. 85.00
L 12th - Floor Rs. 2.46 Rs. 89.21 Rs. 91.67
M 13th - Floor Rs. 2.46 Rs. 95.80 Rs. 98.26
N 14th - Floor Rs. 2.46 Rs. 102.53 Rs. 104.99
O 15th - Floor Rs. 2.46 Rs. 109.20 Rs. 111.66
Cent'g--18-19
Cent'g--18-19
Note:- For RCC ELSR of staging above 15 m, the % increase in these rates shall be as follows.
15-18 m ---
18 - 21m ---
21- 24 m ---
24 -27m ---
above 27m ---
CENTERING & SCAFFOLDING CHARGES- FLOOR WISE RATES for Steel scaffo
for unsupported height 3.66 M for the year 2018-19 (Pg
CHAJJA SLABS -
Floor LINTELS SUN- COLUMNS BEAMS Up to 150
SHADES mm thick
Cent'g--18-19
Cent'g--18-19
CHAJJA SLABS -
Floor LINTELS SUN- COLUMNS BEAMS Up to 150
SHADES mm thick
CENTERING & SCAFFOLDING CHARGES- FLOOR WISE RATES for Casurina Ballies, Bam
Steel Centring Plates etc., for unsupported height 3.66
SLABS -
CHAJJASU
Floor LINTELS COLUMNS BEAMS Up to 150
N-SHADES
mm thick
Cent'g--18-19
Cent'g--18-19
Note: - Centering & scaffolding charges for steel scaffolding with pipes, jack props, steel centering plates for unsuppor
than the basic material hire charges and relevant labour charges of the applicable floor and item
Cent'g--18-19
Cent'g--18-19
Unit of
Measurem't
per 1 cum
per 1 cum
per 1 cum
per 1 cum
upto 3.66 M
ng Plates,etc.,
per 1 cum
per 1 sqm
per 1 cum
per 1 cum
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 cum
per 1 cum
per 1 cum
per 1 sqm
per 1 sqm
o 3.66 M
ates etc.,
per 1 cum
per 1 sqm
per 1 cum
per 1 cum
per 1 sqm 145.21739 159.74
per 1 sqm
per 1 sqm
per 1 sqm
Cent'g--18-19
Cent'g--18-19
per 1 sqm
per 1 cum
per 1 cum
per 1 cum
per 1 sqm
d front)
Cent'g--18-19
Cent'g--18-19
Cent'g--18-19
Cent'g--18-19
6 - 17
per 1 sqm
per 1 sqm
per 1 sqm
per 1 cum
per 1 cum
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
ws.
9%
15%
21%
27%
30%
WAFFLE -
WALLS, WATER
TANK WALLS
SLABS - (GRID)
SLABS - PERGOL ARCH ARCH
above 150 SLABS HELICAL
above A SLABS BEAMS - BEAMS - DOME
mm - Up to (Rib STAIR-
300 mm (Only Rib up to 1.5 above 1.5 SLABS
300 mm Beams CASES
thick Beams) M Span M Span
thick with
Slabs)
Cent'g--18-19
Cent'g--18-19
WALLS, WATER
TANK WALLS
SLABS - (GRID)
SLABS - PERGOL ARCH ARCH
above 150 SLABS HELICAL
above A SLABS BEAMS - BEAMS - DOME
mm - Up to (Rib STAIR-
300 mm (Only Rib up to 1.5 above 1.5 SLABS
300 mm Beams CASES
thick Beams) M Span M Span
thick with
Slabs)
urina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates,
pported height 3.66 M for the year 2018-19
WAFFLE -
SLABS - (GRID)
SLABS - PERGOL ARCH ARCH
above 150 SLABS HELICAL
above A SLABS BEAMS - BEAMS - DOME
mm - Up to (Rib STAIR-
300 mm (Only Rib up to 1.5 above 1.5 SLABS
300 mm Beams CASES
thick Beams) M Span M Span
thick with
163.00 170.00 Slabs)
575.00 403.00 1586.00 1609.00 2566.00 196.00
172.00 180.00 607.00 425.00 1675.00 1698.00 2708.00 207.00
335.00 350.00 1182.00 828.00 3261.00 3307.00 5274.00 403.00
Cent'g--18-19
Cent'g--18-19
g plates for unsupported heights of every 610 mm height above 3.66 M may be allowed at 16.666% more
Cent'g--18-19
Cent'g--18-19
1144
1255
1368.0
1501
Cent'g--18-19
Page 968 of 2191
KODADA MUNICIPALITY
DATA BASED ON - 2016 - 2017 SSR
WATER SUPPLY AND SANITARY ITEMS
Ref. to SSR
S.N Description Qty Rate Unit
Code No
1 TBSP-A.I-01: Supplying, laying, jointing and testing 101.6 mm SWG SP-1 pipes of ISI make conformin
to ISI 651 & 4127 with airtight cement joints in CM 1.5:1 prop. Including excavation of trenches an
socket pits in any soil (except rock requiring blasting) up to 1524 mm(5'0") depth and refilling wi
watering and tamping.
1 TBSP-A.I-02: Supplying, laying, jointing and testing 101.6 mm SWG SP-1 pipes of ISI make conformin
to ISI 651 & 4127 with airtight cement joints in CM 1:5:10 prop. including excavation of trenches an
socket pits in any soil (except rock requiring blasting) up to 914.4 mm (3'0") depth and refilling wi
watering and tamping.
2 TBSP-A.I-03: Supplying, laying, jointing and testing 152.4 mm SWG SP-1 pipes of ISI make conformin
to ISI 651 & 4127 with airtight cement joints in CM 1.5:10 prop. including excavation of trenches an
socket pits in any soil (except rock requiring blasting) up to 1524 mm(5'0") depth and refilling wi
watering and tamping.
152.4 mm (6") dia SWG pipe upto 5' depth
TBSP-A.I-03 Rate per 1 RM 1 Rmt 708.00 1 Rmt
labour charges only for laying, jointing and testing 20% 313.00
TBSP-A.III-02
SWG pipes
2 TBSP-A.I-04: Supplying, laying, jointing and testing 152.4 mm SWG SP-1 pipes of ISI make conformin
to ISI 651 & 4127 with airtight cement joints in CM 1.5:10 prop. including excavation of trenches an
socket pits in any soil (except rock requiring blasting) up to 914.4 mm (3'0") depth and refilling wi
watering and tamping.
Rate per 1 RM
3 TBSP-A.I-05: Supplying , laying, jointing and testing 152.4 mm CC bed 1:2:4 Prop: using 19.05 m
gauge graded granite metal chips and cradling 101.6 mm SWG pipe line all round to have 76.2 m
thick cover over the sockets.
TBSP-A.I-05 SSR item No. 5 1.00 Rmt 138.00 1 Rmt
BMW-A.08 labour charges only 20% 0.00
Total
Over heads and Contractors profit @ 14% 13.615%
Total
Rate per 1 RM
4 TBSP-A.I-06: Supplying, laying, jointing and testing 152.4 mm CC bed 1:2:4 Prop: using 19.05 m
gauge graded granite metal chips and cradling 152.4 mm SWG pipe line all round to have 76.2 m
thick cover over the sockets.
TBSP-A.I-06 SSR item No.6 1.00 Rmt 237.00 1 Rmt
BMW-A.10 Add Municipal allowance on Labour component- 20% 0.00 1 Rmt
Total
Over heads and Contractors profit @ 13.615% 13.615%
Total
Rate per 1 RM
5 TBSP-B.I-01: Constructing 904.0 mm (3’0”) dia solid block masonry inspection chamber as per IS
4111: Part-1:1986 with cement mortar (1:6) prop using fly-ash blocks of 225 mm thick from approve
source having a minimum crushing strength of 10 N/sq.mm including plastering with cement mortar 1
prop; ½” thick both inside and outside fitted with 20” dia RCC manhole covers and frames includin
excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying ceme
concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 m
thick as per Standard specification and including cost and conveyance of all materials like cemen
sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental an
operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc
complete for finished item of work as per Standard specification.
chamber 3' dia and upto 3' depth - Fly- ash bricks
TBSP-B.I-01 Rate as per SSR item - 74 1 No. 7338.00 Each
Over heads and Contractors profit @ 13.615% 13.615%
Total
Rate per 1 No
6 TBSP-B.I-02: Constructing 904.0 mm (3’0”) dia solid block masonry inspection chamber as per IS
4111: Part-1:1986 with cement mortar (1:6) prop using fly-ash blocks of 225 mm thick from approve
source having a minimum crushing strength of 10 N/sq.mm including plastering with cement mortar 1
prop; ½” thick both inside and outside fitted with 20” dia RCC manhole covers and frames includin
excavating pits up to a depth of 1524 mm (5'-0") in all sorts of soils (excluding rock) and laying ceme
concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 m
thick as per Standard specification and including cost and conveyance of all materials like cemen
sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental an
operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc
complete for finished item of work as per Standard specification.
chamber 3' dia and upto 5' depth - Fly- ash bricks
TBSP-B.I-02 Rate as per SSR item -75 1 No. 11694.00 Each
Over heads and Contractors profit @ 13.615% 13.615%
Total
Rate per 1 No
3 TBSP-B.I-03: Constructing 904.0 mm (3’0”) dia brick masonry inspection chamber as per IS - 4111: Par
1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approve
source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1
prop; ½” thick both inside and outside fitted with 20” dia RCC manhole covers and frames includin
excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying ceme
concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 m
thick as per Standard specification and including cost and conveyance of all materials like cemen
sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental an
operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc
complete for finished item of work as per Standard specification.
4 TBSP-B.I-04: Constructing 904.0 mm (3’0”) dia brick masonry inspection chamber as per IS - 4111: Par
1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approve
source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1
prop; ½” thick both inside and outside fitted with 20” dia RCC manhole covers and frames includin
excavating pits up to a depth of 1524 mm (5'-0") in all sorts of soils (excluding rock) and laying ceme
concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 m
thick as per Standard specification and including cost and conveyance of all materials like cemen
sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental an
operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc
complete for finished item of work as per Standard specification.
5 TBSP-B.II-01: Constructing 914.4 mm x 457.2 mm (3'0"x1'6") brick in CM 1:6 prop. Masonry Inspectio
chamber up to 914.4 mm (3'0") and fitted with light weight 914.4 mm x 457.2 mm (3'0"x1'6") C.I fram
and cover of 40 Kg.
TBSP-B.II-01 Rate as per SSR item -78 1 No. 6324.00 Each
Over heads and Contractors profit @ 13.615% 13.615%
Total
Rate per 1 No
6 TBSP-B.II-02: Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspectio
chamber up to 914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I fram
and cover of 20 Kg.
TBSP-B.II-02 Rate as per SSR item -79 1 No. 3813.00 Each
Over heads and Contractors profit @ 13.615% 13.615%
Total
Rate per 1 No
7 TBSP-B.III-01: Making drainage connection in the existing inspection chamber including all repairs
TBSP-B.III-01 Rate as per SSR item-91 1 No. 130.00 1 Each
Add Municipal allowance on Labour component- 20% 0.00
BMW-B.08
SSR item-85
Total
Over heads and Contractors profit @ 13.615% 13.615%
Total
Rate per 1 No
5 TBSP-C.II-30 :TBSP-A.I-09: Supplying & fixing 150 mm x 100 mm SWG gully traps conforming to IS
651 & 4127 with C.I Grating & Cost. Brick masonry in CM 1:6 prop. Intermediate chamber and fitted wi
304.8 mm x 288.6mm (12"x9") C.I Frame and hinged cover
TBSP-A.I-09 Rate as per SSR Item No.9 1 No. 619.00 1 Each
Over heads and Contractors profit @ 13.615% 13.615%
Total
Rate per 1 No
6 TBSP-C.II-30: Supplying & fixing CI floor traps 1st quality ISI marked conforming to IS:172
1979 with C.P. Grating fixing with white cement as per site requirements with standard
practice for nominal dia 75 mm (3") and grating size 100 mm dia of weight not less than 4.0 Kgs
TBSP-C.II-30 Rate as per SSR item-127 1 No. 326.00 1 Each
BMW-C.42 Add Municipal allowance on Labour 20% 0.00
Observed Data
7 TBSP-E.I-01:Providing and fixing 23" (584.2mm) long white glazed Indian WC Orissa pan
parry/Neycer/HSW make with P or S trap with brick masonry seat, CC squatting plate and 10 lit capaci
PVC slimline low level flush tank of approved make with internal components and fixed with woode
gutties as approved by Engineer-in-charge with required size nails, 15mm PVC connections 31.75 m
brass plumber union nuts, 32mm dia long CP bend and 12.70 mm (1/2")NP stop cock, heavy duty (30
grams), P trap or S trap of Indian W.C. shall be encased on CC (1:2:4) 6” alround well above the joint
stop leakage at the joint etc., complete including cost and conveyance of all materials to site, cost of C
bed, labour charges and seigniorage charges etc., complete for finished item of work.
8 TBSP-E.I-01:Providing and fixing 23" (584.2mm) long white glazed Indian WC Orissa pan
parry/Neycer/HSW make with P or S trap with brick masonry seat, CC squatting plate as approved b
Engineer-in-charge, W.C. shall be encased on CC (1:2:4) 6” alround well above the joint to stop leakag
at the joint etc., complete including cost and conveyance of all materials to site, cost of CC bed, labo
charges and segniorage charges etc., complete for finished item of work.
Rate per 1 No
Observed Data
8 TBSP-E.II-02:Supply & fixing white glazed European water closet with variety as approved b
Engineer-in-charge, P" or S" trap with 4" CI outlet pipe of approved make, plastic seat and lid for EW
and rubber buffers as per ISI 2548 1963 with and low down porcelain flushing tank with
lid 10 Lit Capacity with internal components and fixed with wooden gutties with required size nail
32mm dia short CP bend, 15 mm PVC connections with brass union nuts and 12.70 mm (1/2")NP sto
cock heavy duty (300 grams), complete including cost and conveyance of all materials to site, f
finished item of work for all floors.
TBSP-E.II-02 European Water Closet white glazed with 'S' trap 1 No 1619.00 1 Each
-146
Add Municipal allowance on Labour -SSR item- 20% 287.00
TBSP-E.VIII-06
293
TBSP-E.V-01 S & F fixing of plastic seat and lid -S.No. 266 1 No 734.00 1 Each
Add Municipal allowance on Labour -SSR item- 20% 83.00
TBSP-E.VIII-07
294
S & F slim line porcelein flush tank 10 Ltrs. 1 No 2089.00 1 Each
TBSP-E.IV-01
capacity of approved make - Sl.No.263
Add Municipal allowance on Labour -SSR item- 20% 572.00
TBSP-E.VIII-04
291
S & F of 15 mm PVC connection with brass union 1 No 101.00 1 Each
TBSP-J.I-32
nuts - Sl.No.644
BMW-I.49 Add Municipal allowance on Labour 20% 0.00
S&F 15 mm nominal size brass concealed stop 1 No 224.00 1 Each
TBSP-F.IV-02 valve screw type with internal /external
threaded conforming to IS 8931
BMW-E.02 Add Municipal allowance on Labour 20% 0.00
TBSP-F.VII-36 Cost of CP bend as per S.No. No.382 1 No 159.00 1 Each
S & F 76.2 x 101.6 mm teak wood block 2 Nos 24.00 1 Each
TBSP-J.I-31
-S.No.643
BMW-I.43 Add Municipal allowance on Labour - 20% 0.00
Rate per 1 No
9 TBSP-E.II-04:Supply, Installation and commissioning approved make floor mounted EWC (su
CASCADE model 'P' or 'S' trap with dual flush porcelain cistern fixed on EWC with all internal parts
dual flush cistern, ultra solid seat cover of approved make with rubber buffer and cap 15 mm ang
stop cock 450 mm long PVC inter connection pipe wall flanges all of approved make et
complete for finished item of work in all respects: White Colour
Rate per 1 No
10 TBSP-E.II-05:Supply, Installation and commissioning approved make floor mounted EWC (su
CASCADE model 'P' or 'S' trap with dual flush porcelain cistern fixed on EWC with all internal parts
dual flush cistern, ultra solid seat cover of approved make with rubber buffer and cap 15 mm ang
stop cock 450 mm long PVC inter connection pipe wall flanges all of approved make et
complete for finished item of work in all respects: Coloured - Grade - I/ Grade - II
Rate per 1 No
10 TBSP-E.II-06: Supply, Installation and commissioning approved make floor mounted EWC (su
CASCADE model 'P' or 'S' trap with dual flush porcelain cistern fixed on EWC with all internal parts
dual flush cistern, ultra solid seat cover of approved make with rubber buffer and cap 15 mm ang
stop cock 450 mm long PVC inter connection pipe wall flanges all of approved make et
complete for finished item of work in all respects: Special Colour - Grade - III
Rate per 1 No
11 TBSP-E.VI-01: Supplying & Fixing 660 x 460 mm - Indian make Flat Back Wash Hand Bas
(HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubb
plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 an
fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seik
Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden bloc
Single C.P. Pillar cock
Rate per 1 No
12 TBSP-E.VI-02:Supplying & Fixing 630 x 450 mm - Indian make Flat Back Wash Hand Bas
(HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubb
plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 an
fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seik
Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block
Single C.P. Pillar cock
Rate per 1 No
11 TBSP-E.VI-03: Supplying & Fixing 630 x 450 mm Indian make Flat Back Wash Hand Bas
(HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubb
plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 an
fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seik
Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block:
Double C.P. Pillar cock
Rate per 1 No
12 TBSP-E.VI-04: Supplying & Fixing 550 x 400 mm -Indian make Flat Back Wash Hand Bas
(HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubb
plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 an
fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seik
Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block
Single C.P. Pillar cock
Rate per 1 No
Observed Data
12 TBSP-E.VI-05: Supplying & Fixing 550 x 400 mm Indian make Flat Back Wash Hand Bas
(HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubb
plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 an
fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seik
Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block:
Single C.P. Pillar cock
Rate per 1 No
Observed Data
13 TBSP-E.VI-06: Supplying & Fixing 450 x 300 mm - Indian make Flat Back Wash Hand Bas
(HSW/Parryware/Neycer) 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubb
plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 an
fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seik
Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden bloc
Single C.P. Pillar cock
Rate per 1 No
14 TBSP-E.VI-07: Supplying & Fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neyce
1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nomin
size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nomin
bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso o
equivalent complete with standard CI brackets including wooden block: 450 x 300 mm - Doub
C.P. Pillar cock
Rate per 1 No
15 TBSP-E.VI-11:Supply, installing and commissioning Oval shape basin white glazed 520 x 410mm
approved make with 1 No 31.75mm CP bottle trap with extention pipe, 12.70mm single NP pillar coc
(400) grams 1 st quality, 1 No. 32mm dia CP waste coupling, CI brackets, 1 No. 12.7mm NP stop coc
(300 grams), 1 No.12.70mm PVC connection with brass union nuts, brass plumber union nut
Chiselling brick masonry wall, wooden blocks & nails including cost and conveyance of all materials
site, labour charges etc. complete for finished item of work.
TBSP-E.VI-11 Cost of Oval shape Wash hand basin- S.No. 278 1 No. 2250.00 1 Each
TBSP-F.IV- S&F 15 mm nominal size brass concealed stop 1 No. 551.00 1 Each
05 valve screw type with internal /external
threaded conforming to IS 8931
S& F 38.1 mm dia PVC solid waste pipe outlet- 1 No. 89.00 1 Each
TBSP-H.II-05
S.No.508
TBSP-H.II-04 Cost of 31.75 waste water pipe - S.No.507 1 No. 26.00 1 Each
S & F of 15 mm PVC connection with brass union 1 No. 101.00 1 Each
TBSP-J.I-32
nuts - Sl.No.644
Chiselling the brick masonry wall and repairs as 1 Rmt 30.00 1 Rmt
TBSP-J.I-05
directed by the department
Rate per 1 No
15 TBSP-E.VII-02:Supplying & Fixing white glazed flat back half stall urinals of size 410 x 265 x 30
mm with internal flushing rim fixed with screws complete,1st quality ISI marked variety, as approved b
Engineer-in-charge, 12.7mm PVC connections with brass plumber union nuts, 12.70mm push cock 1
quality of approved make including 32mm dia. PVC waste pipe including cost and conveyance of a
materials to site, labour charges etc., complete for finished item of work for all floors.
TBSP-E.VII-02 Rate as per SSR item 285 1 No 2300.00 1 Each
15mm PVC connections with brass plumber union 1 No 101.00 1 Each
TBSP-J.I-32
nuts - S.No.644
BMW-I.49 Add Municipal allowance on Labour - 20% 0.00
S&F of 15 mm brass body CP finish self closing 1 No 246.00 1 Each
TBSP-F.III-01
tap push type conforming to IS 1711
Supply & Fixing 40 mm nominal size dia PVC 1 No 89.00 1 Each
TBSP-H.II-05
solid waste
S&F 76.2 x 101.6 mm teak wood block complete 2 No 24.00 1 Each
TBSP-J.I-31
Rate per 1 No
Observed Data
15 TBSP-E.VII-03:Supplying & Fixing white glazed flat back half stall urinals of size 590 x 375 x 39
mm with internal flushing rim fixed with screws complete,1st quality ISI marked variety, as approved b
Engineer-in-charge, 15 mm PVC connections with brass plumber union nuts, S&F of 15 mm brass bod
CP finish self closing tap push type conforming to IS 1711 1st quality of approved make including 40 m
dia. PVC waste pipe including cost 76.2 x 101.6 mm teak wood block and conveyance of all materials
site, labour charges etc., complete for finished item of work for all floors.
Rate per 1 No
16 Supplying & Fixing white glazed squatting type urinal 1st quality ISI marked variety, as approved b
Engineer-in-charge, 15mm PVC connections with brass plumber union nuts, 12.70mm push cock 1
quality of approved make i including cost and conveyance of all materials to site, labour charges etc
complete for finished item of work for all floors.
17 TBSP-E.VI-13:S & F of stainless steel sink with drain board of size 914.4 mm x 457.2mm, 1mm thick
Indian make on cantilever brackets with including 32mm C.P. waste coupling, supplying and fixing PV
waste pipe of required length including chasing brick masonry wall and making good restoring to origin
surfaces etc., complete.for finished item of work in all floors
17 TBSP-F.VII-21:S & F brass soap dish heavy type approved make with NP screws etc., comple
including cost and conveyance of all materials, labour charges for finished item of work in all floors
Rate as per SSR item.367 (-with 7 years 1 No 514.00 1 Each
TBSP-F.VII-21
warranty:)
Over heads and Contractors profit @ 13.615% 13.615% 514.00
18 TBSP-J.I-35: Supplying and fixing TV shape mirror with plastic frame size 609.6 mm x 457 .2 mm
19 TBSP-J.I-25:S & F 25mm dia 0.60 mtrs. Long aluminium anodized towel rods with brackets etc
including cost and conveyance of all materials, labour charges etc., complete for finished item of work.
TBSP-J.I-25 Rate as per SSR S.No.637 1 No. 149.00 1 Each
TBSP-F.VIII-04 Labour charges only 20% 99.00
20 TBSP-F.VI-06:Supply & fixing overhead shower rose with revolving joint and 150 mm long swivel show
arm Jaquar make queen series. with 7 years warranty: Chrome plated / Jupiter Aqua Lines-JAL
equivalent seriesincluding cost and conveyance of all materials to work site all labour charges for fixin
etc., complete
TBSP-F.VI-06 Rate as per SSR 344 1 No. 1361.00 1 Each
Over heads and Contractors profit @ 13.615% 14% 1361.00
20 TBSP-F.I-02:S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight with
quarter turn spindle with either internal or external threaded connection conforming to IS 8931
300 grams
12.7 mm N.P bib tap heavy duty - SSR S.No.301 1 No. 543.00 1 Each
TBSP-F.I-02
21 TBSP-F.I-01: S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw
type (full turn) with internal /external threaded connection conforming to IS 8931
250 gms
12.7 mm N.P bib tap heavy duty - SSR S.No.300 1 No. 223.00 1 Each
TBSP-F.I-01
23 TBSP-D.I-01:Supplying and fixing of CI pipes ISI marked (IS No. 1729) variety with cement caulke
joints and fixing all special such as plug bends, off sets, single junctions, double junctions as per si
requirement including painting black with Japan paint and fixing with necessary wooden blocks fixed
the masonry walls in CM (1.5:1) and including fixing of MS clamps if necessary with required number
Bombay nails including cost and conveyance of all materials to site, labour charges etc.complete f
finished item of work at all floor levels. (APSS No. 1302 1319 & 1326)
24 TBSP-J.I-30:Supplying and fixing A.C Cowls first quality including cost and conveyance of all material
all labour charges , etc. complete for finished item of work
23 TBSP-G.I-01:Supplying & fixing GI pipe Medium Grade as per IS 1239 ISI mark in ground or on wa
including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc
with necessary excavation in all types of soils except rock requiring blasting, refilling, chasing mason
walls and making good the walls & floors to the originals, surface and fixing MS clamps of TW block o
walls, including cost and conveyance of all materials and labour charges complete for finished item
work.
15 mm dia nominal bore
TBSP-G.I-01 Rate as per SSR 1.00 RM 166.00 RM
BMW-F.80 Labour charges only 20% 0.00
For 1 RM
Over heads and Contractors profit @ 13.615% 166.00
TBSP-G.I-13:S & F 65 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 123
with GI fittings such as elbows tees couplings, nipples, plugs including excavation for trenches and
refilling the trenches complete except for GI bends union and GI connectors with checkout an
socket Tata or Zenith make or equivalent
24 TBSP-G.III-01:Supplying & Fixing Gun metal Gate (GM peet) valve as per IS - 778 Class of approve
type including cost and conveyance of all materials & labour charges at all levels in all floors f
following.(Bronze)
23 TBSP-G.III-09:Supplying & fixing Gunmetal (GM) Horizontal Check (Non return) Valve as per IS-77
I-class heavy duty of approved type including cost and conveyance of all materials & labour charges
all levels in all floors for following.
24 TBSP-G.III-14:Supplying & fixing Gunmetal (GM) Vertical Check (Non return) Valve as per IS-778
class heavy duty of approved type including cost and conveyance of all materials & labour charges at a
levels in all floors for following.(Bronze)
25 TBSP-G.III-20:Supplying & fixing Gunmetal (GM) Ball valve with SS Ball and SS Spindle as per IS
Class - I, Indian make heavy type of approved type including cost and conveyance of all materials
labour charges at all levels in all floors for following.
25 TBSP-H.II-01:Providing and placing on terrace (at all floor levels)polyetheylene water storage tank wi
double layer approved brand and manufacture with cover and suitable locking arrangement and makin
necessary holes for inlet and outlets and over flow pipes but without fittings and base support for tanks
Observed Data
26 TBSP-E.VI-09:Supplying & Fixing Indian make white glazed vitreous china porcelain sink conforming
IS:2556-Part-5-1994 on cantilever brackets with waste fittings like rubber plug, chain, 32 mm nomin
size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 : 600 x 400 x 250 complete f
finished item of work in all floors.
27 TBSP-E.VI-10:Supplying & Fixing Indian make white glazed vitreous china porcelain sink conforming
IS:2556-Part-5-1994 on cantilever brackets with waste fittings like rubber plug, chain, 32 mm nomina
size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 : 750 x 450 x 250 etc. comple
for finished item of work in all floors.
28 TBSP-E.VI-16:Supplying & Fixing 609.6 x 457.2 x 254 mm RCC terrazzo finished sink (or constructe
at site with 50.8mm thick) brass plug and chain including CI cantilever brackets etc. complete f
finished item of work in all floors.
27 TBSP-J.I-05:Supplying and fixing of 20 mm marble partitioins of size 4' 0" x 2' 0" for urinals includin
rounding edges, three sides, fixing, polishing, etc. complete for finished item of work
Rate as per Quotation 0.72 Sqm 712.80 Sqm
TBSP-J.I-05 Chiselling the brick masonry wall (184) 1.2 RM 30.00 RM
Labour charges for fixing 1.2 RM 0.00 RM
28 TBSP-E.VII-04:Supplying & fixing 4" x 24" (101.6x609.6mm) white glazed porcelain channel fixed
brick masonry white cement pointing including fixing in CM ( 1 1/2:1) to the required slopes includin
cost and conveyance of all materials and labour charges for finished item of work etc. complete
TBSP-E.VII-04 Rate as per SSR 287 1 No 449.00 1 Each
Over heads and Contractors profit @ 13.615% 449.00
Rate for Each of 0.6096 m
Rate per 1 Rm
Rate per 1 Rm
29 TBSP-F.VII-06:S & F 32 mm C.P waste coupling and 32mm dia PVC waste pipe including cost an
conveyance of all materials and labour charges for finished item of work etc. complete
30 TBSP-B.II-04:Construction of brick masonry support for GI pipe of size 304.80 x 228.60 x 228.60 mm
CM (1:6) prop including plastering with 12mm thick in CM (1:5) prop including all labour charges et
complete for finished item of work.
TBSP-B.II-04 Rate as per SSR 1 No 76.00 1 Each
BMW-I.64 Labour charges only 20% 0.00
31 TBSP-F.VI-01:Providing and fixing of 12.70 mm x 152.00mm CP shower rose heavy 1st quality
approved make including cost and conveyance of all materials to work site all labour chages for fixin
etc. complete(Iron body)
TBSP-F.VI-01 Rate as per SSR S.No.339 1 No 169.00 1 Each
BMW-F.101 Labour charges only 20% 0.00
33 TBSP-H.I-01:Supplying and fixing of SWR PVC pipes (as per ISI standards) 4 Kg/Sq.cm. and fixing a
special such as plain bends, off sets, door bends, single junctions, double junctions as per si
requirement, fixing with PVC clamps if necessary with required number of Bombay nails including co
and conveyance of all materials to site, labour charges etc.complete for finished item of work at all flo
levels. (APSS No. 1302 1319 & 1326)
Rate per 1 RM
say
For 90mm dia per 6 RM
TBSP-H.I-02 Cost of PVC pipe (346) - 3 M long 6.00 Rmt 401.00 3 Rmt
Labour charges for laying, fixing and 6.00 Rmt 0.00 1 Rmt
BMW-G.152
commissioning the PVC pipes
TBSP-H.I-20 Cost of PVC pipe (363) - 0.60 M long 2 Nos. 111.00 1 Each
TBSP-H.II-14 Cost of Door bend (516) 1 No. 94.00 1 Each
TBSP-H.II-11 Cost of Plain bend (513) 1 No. 70.00 1 Each
TBSP-H.II-38 Cost of Single Y junction (540) 1 No. 148.00 1 Each
TBSP-H.II-54 Cost of PVC cowl ( 556) 1 No. 17.00 1 Each
TBSP-G.II-21 Cost of PVC clamps (426) 3 Nos. 30.00 1 Each
BMW-F.96 Labour charges 3 Nos. 0.00 1 Each
Rate per 1 RM
say
Rate per 1 RM
say
34 TBSP-A.II-43:Supply, delivery and fixing in position of SWG Tee with length of barrel 60 cm for - 300
300 including cost and conveyance of all material and all labour charges etc, complete.
Supply of SWG Junctions (T's & Y's) conforming 1 No. 1985.00 1 Each
TBSP-A.II-43 to IS standards with length of barrel 60 cm for -
300 x 300
Labour charges for fixing and laying the SWG 1 No. 33.00 1 Each
TBSP-A.III-05 Junctions/ Plugs/ Bends of any dia with airtight
cement joints as per standard practice
PPR PIPES
35 Supply of 20mm x 2.8mm PN 16/PPR pipe 1.00 RM 60.00 1 RM
TBSP-J.III-22
conforming to DIN Standards 8077/8078
Labour charges for laying, joining, welding, fixing 1.00 RM 34.00 1 RM
and commissioning the PPR pipes including all
specials such as couplers/ bends/ tees etc
TBSP-H.IV-02 including fixing necessary fittings like bends,
plugs, couplers, junctions, tees, etc with welding
the joint as per standard practice - up to 40
mm dia
ODADA MUNICIPALITY
ASED ON - 2016 - 2017 SSR
PPLY AND SANITARY ITEMS
Amount
g, jointing and testing 101.6 mm SWG SP-1 pipes of ISI make conforming
t cement joints in CM 1.5:1 prop. Including excavation of trenches and
pt rock requiring blasting) up to 1524 mm(5'0") depth and refilling with
491.00
62.60
553.60
66.85
620.45
620.45
g, jointing and testing 101.6 mm SWG SP-1 pipes of ISI make conforming
t cement joints in CM 1:5:10 prop. including excavation of trenches and
t rock requiring blasting) up to 914.4 mm (3'0") depth and refilling with
423.00
50.40
473.40
64.45
537.85
537.85
g, jointing and testing 152.4 mm SWG SP-1 pipes of ISI make conforming
t cement joints in CM 1.5:10 prop. including excavation of trenches and
pt rock requiring blasting) up to 1524 mm(5'0") depth and refilling with
708.00
62.60
770.60
96.39
866.99
866.99
g, jointing and testing 152.4 mm SWG SP-1 pipes of ISI make conforming
t cement joints in CM 1.5:10 prop. including excavation of trenches and
t rock requiring blasting) up to 914.4 mm (3'0") depth and refilling with
630.00
50.40
680.40
92.64
773.04
773.04
ng, jointing and testing 152.4 mm CC bed 1:2:4 Prop: using 19.05 mm
hips and cradling 101.6 mm SWG pipe line all round to have 76.2 mm
138.00
0.00
138.00
18.79
156.79
156.79
237.00
0.00
237.00
32.27
269.27
269.27
7338.00
999.07
8337.07
8337.07
11694.00
1592.14
13286.14
13286.14
4.0 mm (3’0”) dia brick masonry inspection chamber as per IS - 4111: Part-
:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved
shing strength of 5 N/sq.mm including plastering with cement mortar 1:3
d outside fitted with 20” dia RCC manhole covers and frames including
of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement
using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm
cation and including cost and conveyance of all materials like cement,
te, cost of seigniorage charges on all materials and all incidental and
ke mixing cement mortar, constructing masonry, lift charges, curing etc.,
ork as per Standard specification.
7321.00
996.75
8317.75
8317.75
4.0 mm (3’0”) dia brick masonry inspection chamber as per IS - 4111: Part-
1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved
shing strength of 5 N/sq.mm including plastering with cement mortar 1:3
d outside fitted with 20” dia RCC manhole covers and frames including
of 1524 mm (5'-0") in all sorts of soils (excluding rock) and laying cement
using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm
cation and including cost and conveyance of all materials like cement,
te, cost of seigniorage charges on all materials and all incidental and
ke mixing cement mortar, constructing masonry, lift charges, curing etc.,
ork as per Standard specification.
11649.00
1586.01
13235.01
13235.01
6324.00
861.01
7185.01
7185.01
3813.00
519.14
4332.14
4332.14
130.00
17.70
147.70
147.70
upplying & fixing 150 mm x 100 mm SWG gully traps conforming to ISI
Cost. Brick masonry in CM 1:6 prop. Intermediate chamber and fitted with
C.I Frame and hinged cover
619.00
84.28
703.28
703.28
865.00
81.80
271.00
81.00
2089.00
114.40
101.00
0.00
224.00
0.00
63.00
159.00
48.00
0.00
4097.20
557.83
4655.03
4655.03
865.00
81.80
271.00
81.00
1298.80
176.83
1475.63
1475.63
1619.00
57.40
734.00
16.60
2089.00
114.40
101.00
0.00
224.00
0.00
159.00
48.00
0.00
5162.40
702.86
5865.26
5865.26
7986.00
1087.29
9073.29
9073.29
11672.00
1589.14
13261.14
13261.14
14866.00
2024.01
16890.01
16890.01
Fixing 660 x 460 mm - Indian make Flat Back Wash Hand Basin
quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber
ize C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and
Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/
alent complete with standard CI brackets including wooden block:
2237.00
1036.00
445.62
3718.62
3718.62
xing 630 x 450 mm - Indian make Flat Back Wash Hand Basin
quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber
ize C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and
Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/
alent complete with standard CI brackets including wooden block:
1981.00
1036.00
410.76
3427.76
3427.76
Fixing 630 x 450 mm Indian make Flat Back Wash Hand Basin
quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber
ize C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and
Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/
lent complete with standard CI brackets including wooden block: -
2428.00
1036.00
471.62
3935.62
3935.62
Fixing 550 x 400 mm -Indian make Flat Back Wash Hand Basin
quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber
ize C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and
Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/
alent complete with standard CI brackets including wooden block:
1469.00
1036.00
341.06
2846.06
2846.06
Fixing 550 x 400 mm Indian make Flat Back Wash Hand Basin
quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber
ize C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and
Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/
lent complete with standard CI brackets including wooden block: -
1789.00
1036.00
384.62
3209.62
3209.62
Fixing 450 x 300 mm - Indian make Flat Back Wash Hand Basin
quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber
ize C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and
Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/
alent complete with standard CI brackets including wooden block:
1278.00
1036.00
315.05
2629.05
2629.05
xing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer)
56-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal
pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal
ap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or
andard CI brackets including wooden block: 450 x 300 mm - Double
1661.00
1036.00
367.20
3064.20
3064.20
2250.00
551.00
89.00
26.00
101.00
30.00
3047.00
414.85
3461.85
3461.85
xing white glazed flat back Bowl urinals of size 440 mm x 265 mm x 315
ixed with screws complete,1st quality ISI marked variety, as approved by
VC connections with brass plumber union nuts, S&F of 15 mm brass body
type conforming to IS 1711 1st quality of approved make including 40 mm
cost 76.2 x 101.6 mm teak wood block and conveyance of all materials to
lete for finished item of work for all floors.
767.00
32.60
101.00
0.00
246.00
89.00
48.00
0.00
1283.60
174.76
1458.36
1458.36
xing white glazed flat back half stall urinals of size 410 x 265 x 305
fixed with screws complete,1st quality ISI marked variety, as approved by
PVC connections with brass plumber union nuts, 12.70mm push cock 1st
uding 32mm dia. PVC waste pipe including cost and conveyance of all
s etc., complete for finished item of work for all floors.
2300.00
101.00
0.00
246.00
89.00
48.00
0.00
2784.00
379.04
3163.04
3163.04
xing white glazed flat back half stall urinals of size 590 x 375 x 390
fixed with screws complete,1st quality ISI marked variety, as approved by
VC connections with brass plumber union nuts, S&F of 15 mm brass body
type conforming to IS 1711 1st quality of approved make including 40 mm
cost 76.2 x 101.6 mm teak wood block and conveyance of all materials to
lete for finished item of work for all floors.
2555.00
101.00
0.00
246.00
89.00
48.00
0.00
3039.00
413.76
3452.76
3452.76
350.00
101.00
0.00
246.00
697.00
94.90
791.90
791.90
ss steel sink with drain board of size 914.4 mm x 457.2mm, 1mm thick of
ckets with including 32mm C.P. waste coupling, supplying and fixing PVC
ncluding chasing brick masonry wall and making good restoring to original
shed item of work in all floors
6224.00
81.80
89.00
6394.80
870.65
7265.45
7265.45
soap dish heavy type approved make with NP screws etc., complete
of all materials, labour charges for finished item of work in all floors
514.00
69.98
583.98
584.00
466.00
0.00
466.00
63.45
529.45
529.45
a 0.60 mtrs. Long aluminium anodized towel rods with brackets etc.,
of all materials, labour charges etc., complete for finished item of work.
149.00
19.80
168.80
22.98
191.78
191.78
overhead shower rose with revolving joint and 150 mm long swivel shower
es. with 7 years warranty: Chrome plated / Jupiter Aqua Lines-JALor
and conveyance of all materials to work site all labour charges for fixing
1361.00
185.30
1546.30
1546.30
ass body CP finish bib tap of not less than 300 grams weight with
er internal or external threaded connection conforming to IS 8931
543.00
73.93
616.93
616.93
brass body CP finish bib tap of not less than 300 grams weight screw
external threaded connection conforming to IS 8931
223.00
0.00
223.00
30.36
253.36
253.36
2914.00
396.74
3310.74
3310.74
xing of CI pipes ISI marked (IS No. 1729) variety with cement caulked
ch as plug bends, off sets, single junctions, double junctions as per site
black with Japan paint and fixing with necessary wooden blocks fixed in
1) and including fixing of MS clamps if necessary with required number of
and conveyance of all materials to site, labour charges etc.complete for
r levels. (APSS No. 1302 1319 & 1326)
4946.67
49.20
489.00
19.60
403.00
9.80
365.00
15.60
6297.87
629.79
85.75
715.53
715.53
6583.33
49.20
765.00
19.60
489.00
9.80
429.00
15.60
8360.53
836.05
113.83
949.88
949.88
ng A.C Cowls first quality including cost and conveyance of all materials,
ete for finished item of work
44.00
0.00
44.00
5.99
49.99
49.99
65.00
0.00
65.00
8.85
138.85
138.85
brass body CP finish self closing tap push including cost and
all labour charges etc,.
246.00
10.20
256.20
34.88
291.08
291.08
166.00
0.00
166.00
22.60
188.60
188.60
190.00
0.00
190.00
25.87
215.87
215.87
250.00
0.00
250.00
34.04
284.04
284.04
347.00
0.00
347.00
47.24
394.24
394.24
392.00
0.00
392.00
53.37
445.37
445.37
428.00
0.00
428.00
58.27
486.27
486.27
ominal Bore GI pipe Medium Grade properties & weight as per IS 1239
s tees couplings, nipples, plugs including excavation for trenches and
ete except for GI bends union and GI connectors with checkout and
equivalent
802.00
802.00
109.19
911.19
911.19
ing Gun metal Gate (GM peet) valve as per IS - 778 Class of approved
eyance of all materials & labour charges at all levels in all floors for
577.00
0.00
577.00
78.56
655.56
655.56
778.00
0.00
778.00
105.92
883.92
883.92
1119.00
0.00
1119.00
152.35
1271.35
1271.35
1700.00
0.00
1700.00
231.46
1931.46
1931.46
2297.00
0.00
2297.00
312.74
2609.74
2609.74
3365.00
0.00
3365.00
458.14
3823.14
3823.00
5196.00
0.00
5196.00
707.44
5903.44
5903.44
426.00
0.00
426.00
58.00
484.00
484.00
623.00
0.00
623.00
84.82
707.82
707.82
973.00
0.00
973.00
132.47
1105.47
1105.47
1428.00
0.00
1428.00
194.42
1622.42
1622.42
1981.00
0.00
1981.00
269.71
2250.71
2250.71
402.00
0.00
402.00
54.73
456.73
456.73
522.00
0.00
522.00
71.07
593.07
593.07
790.00
0.00
790.00
107.56
897.56
897.56
1088.00
0.00
1088.00
148.13
1236.13
1236.13
1315.00
0.00
1315.00
179.04
1494.04
1494.04
2086.00
0.00
2086.00
284.01
2370.01
2370.00
188.00
0.00
188.00
25.60
213.60
213.60
273.00
0.00
273.00
37.17
310.17
310.17
384.00
0.00
384.00
52.28
436.28
436.28
681.00
0.00
681.00
92.72
773.72
773.72
937.00
0.00
937.00
127.57
1064.57
1064.57
1408.00
0.00
1408.00
191.70
1599.70
1600.00
acing on terrace (at all floor levels)polyetheylene water storage tank with
nd manufacture with cover and suitable locking arrangement and making
utlets and over flow pipes but without fittings and base support for tanks
7.00
0.00
7.00
0.95
7.95
7.95
ing Indian make white glazed vitreous china porcelain sink conforming to
ever brackets with waste fittings like rubber plug, chain, 32 mm nominal
pipe thread conforming to IS:2963-1979 : 600 x 400 x 250 complete for
s.
4087.00
81.80
26.00
4194.80
571.12
4765.92
4765.92
ing Indian make white glazed vitreous china porcelain sink conforming to
ver brackets with waste fittings like rubber plug, chain, 32 mm nominal
ipe thread conforming to IS:2963-1979 : 750 x 450 x 250 etc. complete
oors.
4599.00
81.80
26.00
4706.80
640.83
5347.63
5347.63
ing 609.6 x 457.2 x 254 mm RCC terrazzo finished sink (or constructed
ass plug and chain including CI cantilever brackets etc. complete for
s.
652.00
0.00
26.00
678.00
92.31
770.31
770.31
ing of 20 mm marble partitioins of size 4' 0" x 2' 0" for urinals including
xing, polishing, etc. complete for finished item of work
513.22
36.00
0.00
36.00
4.90
40.90
40.90
C.P waste coupling and 32mm dia PVC waste pipe including cost and
d labour charges for finished item of work etc. complete
212.00
0.00
26.00
238.00
32.40
270.40
270.40
169.00
0.00
169.00
23.01
192.01
192.01
551.00
0.00
551.00
75.02
626.02
626.02
ing of SWR PVC pipes (as per ISI standards) 4 Kg/Sq.cm. and fixing all
, off sets, door bends, single junctions, double junctions as per site
lamps if necessary with required number of Bombay nails including cost
s to site, labour charges etc.complete for finished item of work at all floor
& 1326)
504.00
0.00
134.00
67.00
50.00
94.00
14.00
90.00
0.00
953.00
129.75
1082.75
180.50
180.50
802.00
0.00
222.00
94.00
70.00
148.00
17.00
90.00
0.00
1443.00
196.46
1639.46
273.17
273.17
958.00
0.00
278.00
107.00
83.00
170.00
19.00
90.00
0.00
1705.00
232.14
1937.14
322.83
322.83
and fixing in position of SWG Tee with length of barrel 60 cm for - 300 x
ance of all material and all labour charges etc, complete.
1985.00
33.00
2018.00
274.75
2292.75
60.00
34.00
6.80
100.80
13.72
114.52
Note : The basic item rates provided in the schedule of rates include 50 m (conveyance by manual means) or 1 km (conveyance by mechanical means) as initial lead and no lead
charges shall be allowed where the source of material is within the initial lead specified in item rate. Additional lead charges shall be allowed for the lead exceeding initial lead
specified in the item rate
LOADING,
d unloading )
Bulk
1.32
2.63
3.95
5.26
6.58
7.89
9.21
10.53
11.84
13.16
14.47
15.79
17.11
18.42
19.74
21.05
22.37
23.68
25.00
26.32
27.63
28.95
30.26
31.58
men per MT/Km
Bulk
32.89
34.21
35.53
36.84
38.16
39.47
40.79
42.11
43.42
44.74
46.05
47.37
48.68
50.00
51.32
52.63
53.95
55.26
56.58
57.89
59.21
60.53
61.84
63.16
64.47
65.79
67.11
68.42
69.74
71.05
men per MT/Km
Bulk
72.37
73.68
75.00
76.32
77.63
78.95
80.26
81.58
82.89
84.21
85.53
86.84
88.16
89.47
90.79
92.11
93.42
94.74
96.05
97.37
98.68
100.00
101.32
102.63
103.95
105.26
106.58
107.89
109.21
110.53
men per MT/Km
Bulk
111.84
113.16
114.47
115.79
117.11
118.42
119.74
121.05
122.37
123.68
125.00
126.32
127.63
128.95
130.26
131.58
132.89
134.21
135.53
136.84
138.16
139.47
140.79
142.11
143.42
144.74
146.05
147.37
148.68
150.00
men per MT/Km
Bulk
151.32
152.63
153.95
155.26
156.58
157.89
159.21
160.53
161.84
163.16
164.47
165.13
165.79
167.11
168.42
169.74
171.05
172.37
173.68
175.00
176.32
177.63
178.95
180.26
181.58
182.89
184.21
185.53
186.84
188.16
men per MT/Km
Bulk
189.47
190.79
192.11
193.42
194.74
196.05
197.37
198.68
200.00
201.32
202.63
203.95
205.26
206.58
207.89
209.21
210.53
211.84
213.16
214.47
215.79
217.11
218.42
219.74
221.05
222.37
223.68
225.00
226.32
227.63
men per MT/Km
Bulk
228.95
230.26
231.58
232.89
234.21
235.53
236.84
238.16
239.47
240.79
242.11
243.42
244.74
246.05
247.37
248.68
250.00
251.32
252.63
253.95
255.26
256.58
257.89
259.21
260.53
261.84
263.16
264.47
265.79
267.11
men per MT/Km
Bulk
268.42
269.74
271.05
272.37
273.68
275.00
276.32
277.63
278.95
280.26
281.58
282.89
284.21
285.53
286.84
288.16
289.47
290.79
292.11
293.42
294.74
296.05
297.37
298.68
300.00
301.32
302.63
303.95
305.26
306.58
men per MT/Km
Bulk
307.89
309.21
310.53
311.84
313.16
314.47
315.79
317.11
318.42
319.74
321.05
322.37
323.68
325.00
326.32
327.63
328.95
330.26
331.58
332.89
334.21
335.53
336.84
Sl.
No
Description Qty Rate Unit Amount
1 Drilling of Bore well by down the hole hammer (DTH) drilling to finished dia of 163 mm in all formations to the
depth specified and reaming the bores to the required dia flushing the bore walls at an average pressure of 7
kg/cm2 (100 PSI) conducting yield test, inclusive of transportation from point to point, crew charges, cost of
consumables, shifting of Rig and all other charges etc,.The bore wells should be true & vertical and work should be
carried out to the satisfaction of the department and carried out as per IS 2800 I & II / 1979 and amendments if
any from time to time, the rate is including all taxes etc,. complete as applicable.
Rate as per the Rate contract by the SE (RWS) RR District vide Agreement No. TO/08/2011-12, Dt.03.08.2010
Rate up to 90.00 Mts. Depth 1 Rmt 305.00 1 Rmt 305.00
for every 1.00m length after 90.00m @10% extra 1.1 Rmt 305.00 1 Rmt 335.50
2 Supply and fixing of 180 mm dia PVC casing pipe 6kg/cm2 including cost and conveyance of all materials, labour
charges etc., complete for finished item of works.
Rate worked out as per 2009-10 SSR 1 Rmt 574.80 1 Rmt 574.80
3 Supply and delivery,of submersible pumpsets suitable to 150mm dia
Borewell coupled with motors Single phase 2880 RPM 340V(-15%+10%
range-290 to 375 Volts) / 3 Phase 2880 RPM 400V(-15%+10% range-340
to 440 Volts) of reputed make with minimum overall efficiency of 40% at
the duty point with Radial / mixed flow with a trail run of One week.The
pumpset should confirm to IS 8034/2002 & 9283/1995 with up to date
amendments with ISI mark and a guarantee period of 18 months from the
date of installation. The rates are inclusive of , transportation, installation,
errection of pumpsets but excluding APGST, duties and accessories etc,
complete.
up to 7.50 HP with DOL starter and suitable range of 1 No 6110.00 1 Each 6110.00
capacitor and swith fuse unit including all accessories
above 7.50 and up to 10.00 HP with fully atomatic star 1 No 6800.00 1 Each 6800.00
delta starter and suitable range of capacitor and swith
fuse unit including all accessories
above 10.00 HP with fully atomatic star delta starter and 1 No 10000.00 1 Each 10000.00
suitable range of capacitor and swith fuse unit including
all accessories
5 Supply abd delivery of PVC insulated and PV sheated flexible 3 core flat
type submersible cables suitable for submersible pumpsets conductors
composed of ennealed high conductivity copper wire, conforming to IS 694
with its revisions and ammendments from time to time and delivery at site
of installation of pumpset including central excise duty freight and transit
insurances etc., complete (in small quantities) but exclussive APGST
Rate worked out as per 2009-10 SSR 1 Rmt 104.30 1 Rmt 104.30
18 Lowering, laying, jointing & testing of HDPE Pipe line laid to true alignment
and gradiant to hydraulic field test pressure per IS code including cost of
water with minimum water lead of 500m (Labour charges only) Outer dia
of pipes in mm.
Rate as per GHMC Bore well rates 1 Job 700.00 1 Job 700.00
Rate as per 2009-10 SSr as per data sheet 1 Rmt 104.30 1 Rmt 104.30
25 Lowering, laying, jointing & testing of HDPE Pipe line laid to true alignment
and gradiant to hydraulic field test pressure per IS code including cost of
water with minimum water lead of 500m (Labour charges only) Outer dia
of pipes in mm.
Rate as per 2009-10 SSR as per Lowering sheet 1 Rmt 35.15 1 Rmt 35.15
PRICE SCHEDULE
AGREEMENT NO:TO/08/2011-12, DATED : 03.08.2010
Name of the work:- Drilling of 163mm (6 1/2") dia Bore wells in Ranga Reddy District
Name of the Bore well Firm: M/s. Shiva Drillers, Saidabad, Hyderabad
Cost of 180mm dia/6kgf. UPVC casing pipes for bore wells for
potable water supply confiming to ISI.12818/1992 as amended from 1.00 Rmt.
to time including transporation etc., QC inspection should be carried (One
2 out by the concerned Deputy Executive engineer and Section As per Current SSR with condition of Price variation
Running
Officer, QC Certificate should be produced for making payment meter only)
inculding insertion of casing.
Drilling of Bore wells by down the hole hammer, (DTH) drilling using
combination of 8" to 11" dia Drill Bits in all formations to the using
depth60 m in collasable Soils and reaming the bore to the required
dia flushing the bore walls at an average pressure of 7kg/Cm2 (100
PSI) conducting yield test, inclusive of transportation form point to
point, crew charges, consumables, shifting of Rig and all other 1.00 Rmt.
charges etc., in all over the District. The borewells should be true & (One
3 Rs.535.00 Five hundred and thirty five only
vertical and work should be caried out to the satisfaction of the Running
department and carried out as per IS-2800 Part-1 7 II/ 1979 and meter only)
amendments if andy from time to time . The rate is inculding all
taxes etc., complete as applicable.
Slotted casing Pipe for Combination Rig PVC casing pipes for bore
wells for potable water supply confirming to ISI 12818/1992 as
amended from time to time including transportaion etc., QC 1.00 Rmt.
inspection should be carried out by the concerned Deputy (One As per Current SSR with condition of Price and 10% extra
4
Executive Engineer and section Officer, QC Ceritificate should be Running for slotting
produced for making payment including inseration of casing meter only)
.
KODADA MUNICIPALITY
GENERAL ABSTRACT
Sub-Total. A Rs.
7 Add VAT @ 5%
9 Provision towards QC @ 1%
Sub-Total. B Rs.
Say Rs.
nicipality
Amount in Rs.
#REF!
2072032.02
340771.59
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Page 1036 of 2191
KODADA MUNICIPALITY
Improvement of Ambedkar Junction in Boduppal Municipality
DETAILED & ABSTRACT ESTIMATION
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
A Road Work
1 RBR-STCL-3 : Cutting of trees, including cutting of trunks, branches and
removal of stumps & roots, refilling, compaction of backfilling and stacking of
serviceable material by manual means with all lifts as per Technical
Specification Clause 201MORD / MORTH
for widening of the existing road 1 x 8 8 Nos #REF! 1 Nos
2 RBR-STCL-5 : Dismantling of existing structures like culverts, bridges,
retaining walls and other structure comprising of masonry, cement concrete,
wood work, steel work, including T&P and scaffolding wherever necessary,
sorting the dismantled material, disposal of unserviceable material and
stacking the serviceable material with all lifts and lead of 1000 m as per
Technical Specification Clause 202 MORD / MORTH- By Manual Means
a Cement Concrete M15 & M20 1 x 5 5.00 2.00 0.150 7.50 Cum #REF! 1 Cum
b Reinforced Cement Concrete and prestressed Concrete 1 x 5 4.00 1.00 0.200 4.00 Cum #REF! 1 Cum
3 RBR-STCL-7 ;Dismantling of existing structures like culverts, bridges, retaining
walls and other structure comprising of stone masonry, including disposal of
unserviceable material and stacking the serviceable material with all lifts and
lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH ,
Rubble Stone Masonry in Cement Mortar
existing pedastal of Ambedkar statue ( below and above GL ) pi*r 2*h 1 x 1 3.14 1.85 2.75 15.97
existing pedastal 1st step ( below and above GL ) 1 x 1 2.45 2.45 2.75 16.51
existing pedastal 2nd step ( below and above GL ) 1 x 1 1.90 1.90 1.20 4.33
Compound wall of existing G+4 building at the corners 1 x 1 22.20 0.45 0.60 5.99
foundations of existing structures 1 x 1 11.40 0.45 0.60 3.08
other structures 1 x 4 6.00 0.60 0.60 8.64
54.52 Cum #REF! 1 Cum
4 Dismantling of existing structures like culverts, bridges, retaining walls and
other structures comprising of brick masonry, including disposal of
unserviceable material and stacking the serviceable material with all lifts and
lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH
Compound wall of existing G+4 building at the corners 1 x 1 15.20 0.23 1.80 6.29
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
Compound wall of existing G+4 building at the corners 1 x 1 22.20 0.23 1.80 9.19
foundations of existing structures 1 x 1 11.40 0.23 3.05 8.00
other structures 1 x 4 6.00 0.23 3.05 16.84
40.32 Cum #REF! 1 Cum
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
5 RBR-STCL-8 : Dismantling of flexible pavements and disposal of dismantled
materials upto a lead of 1000 m, stacking serviceable and unserviceable
materials separately as per Technical Specification Clause 202 MORD /
MORTH
a Bituminous Courses - By machanical means.
Ch.0m to turning in the right side for widening of the existing road 1 x 1 47.00 2.50 0.100 11.75
for providing mediun and road from chainage 0.00m to 35.00m 1 x 1 35.00 2.05 0.100 7.18
for Mediun -2, from ch.0.00m to 22.00m 1 x 1 22.00 1.25 0.100 2.75
for Mediun -2, from ch.22.00m to 75.00m 1 x 1 53.00 1.25 0.100 6.63
28.31 Cum #REF! 1 Cum
b Granular Courses - by manual means
Ch.0m to turning in the right side for widening of the existing road 1 x 1 47.00 2.50 0.400 47.00
for providing mediun and road from chainage 0.00m to 35.00m 1 x 1 35.00 2.05 0.400 28.70
for Mediun -2, from ch.0.00m to 22.00m 1 x 1 22.00 1.25 0.400 11.00
for Mediun -2, from ch.22.00m to 75.00m 1 x 1 53.00 1.25 0.400 26.50
113.20 Cum #REF! 1 Cum
6 RBR-EECD-5 : Earthwork excavation for road way in soil by mechanical
means including cutting and pushing the earth to side of embankment upto a
lead of 100 metres including trimming bottom and side slopes in accordance
with requirements of lines, grades and cross sections etc., complete for
finished item of work for trench cutting as per MOR&H specification No.301
and as directed by the Engineer-in-Charge
for widening of road - Area- 1 1 x 1 42.50 7.20 0.45 137.70
for widening of road - Area- 2 1 x 1 29.00 4.20 0.45 54.81
for widening of road - Area- 3 1 x 1 29.00 1.20 0.45 15.66
for widening of road - Area- 4 1 x 1 67.50 3.50 0.45 106.31
for widening of road - Area- 5 1 x 1 50.00 1.95 0.45 43.88
for widening of road - Area- 6 1 x 1 12.50 2.20 0.45 12.38
for widening of road - Area- 7 1 x 1 11.00 1.70 0.45 8.42
379.16 Cum #REF! 1 Cum
7 RBR-SBBS-12 : Granular sub-base/base/surface course with local materials
(Table 400.13) by mix in place method normal Construction of granular sub-
base by providing local material spreading in uniform layers with motor grader
on prepared surface, mixing by mix in place method with rotavator at once and
compacting with smooth wheel roller to achieve the desired density complete
as per Clause 401.4 as per Technical Specification Clause 408 MORD.
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
for widening of road - Area- 4 1 x 1 67.50 3.40 0.225 51.64
for widening of road - Area- 5 1 x 1 50.00 1.85 0.225 20.81
for widening of road - Area- 6 1 x 1 12.50 2.10 0.225 5.91
for widening of road - Area- 7 1 x 1 11.00 1.60 0.225 3.96
184.14 Cum #REF! 1 Cum
8 RBR-SBBS-11 : Providing, laying, spreading and compacting graded stone
aggregate to wet mix macadam specification including premixing the material
with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material
by tipper to site, laying in uniform layers in sub-base/base course on a well
prepared sub-base and compacting with smooth wheel roller of 80 to 100kN /
Vibratory Roller 80-100 kN weight to achieve the desired density including
lighting, barricading and maintenance of diversion, etc as per Tables 400.11 &
400.12 and Technical Specification Clause 406 MORD / MORTH.
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
10 RBR-BASC-7: Providing and laying dense graded bituminous macadam with
100-120 TPH batch type HMP producing an average output of 75 tonnes per
hour using crushed aggregates of specified grading, premixed with bituminous
binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the
hot mix to work site, laying with a hydrostatic paver finisher with sensor control
to the required grade, level and alignment, rolling with smooth wheeled,
vibratory and tandem rollers to achieve the desired compaction as per MoRTH
specification clause No. 507 complete in all respects.
B Foot paths
13 BLD-CSTN-2-1 (9): Earth work excavation and depositing on bank for all lifts
and with an initial lead of 10m including all operational, incidental, labour
charges such as shoring ,sheeting, planking, strutting, etc. complete for
finished item of work including seigniorage excluding dewatering charges etc
as per SS - 20 B (APSS 308). Data- Bld -
3
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
a For foot paths
Length and areas as per drawing
for sectioning & levelling of the ground - Area - A 1 x 1 110.00 3.00 0.15 49.50
for sectioning & levelling of the ground - Area - B 1 x 1 383.60 3.00 0.15 172.62
for sectioning & levelling of the ground - Area - C 1 x 1 154.80 3.00 0.15 69.66
for sectioning & levelling of the ground - Area - D 1 x 1 71.60 2.00 0.15 21.48
for sectioning & levelling of the ground - Area - E 1 x 1 30.60 2.00 0.15 9.18
for mediun area - 1 1 x 1 35.00 1.25 0.15 6.56
for mediun area - 2 1 x 1 22.00 2.20 0.15 7.26
1 x 1 53.00 1.25 0.15 9.94
for the foundation of Ambedkar statue ( pi x r 2 x h ) ( 1.7m dia) 1 x 1 3.14 0.72 1.35 3.05
around the pedastal for ramp ( 2 x pi x r x t x h ) 1 x 6.28 2.00 1.00 0.20 2.51
for foundation of Kerb in area - A 1 x 2 40.00 0.215 0.30 5.16
for foundation of Kerb in area - B 1 x 2 119.60 0.215 0.30 15.43
for foundation of Kerb in area - C 1 x 2 56.40 0.215 0.30 7.28
for foundation of Kerb in area - D 1 x 2 38.00 0.215 0.30 4.90
for foundation of Kerb in area - E 1 x 2 17.30 0.215 0.30 2.23
for mediun area - 1 1 x 2 40.00 0.215 0.30 5.16
for mediun area - 2 1 x 2 80.00 0.215 0.30 10.32
Total Qty 402.24 Cum 210.92 1 Cum
14 BLD-CSTN-2-8 (16) : Filling with Stone dust in trenches, sides of foundations
and basement with initial lead in layers not exceeding 15 cm thick,
consolidating each deposited layer by watering and ramming including cost
and conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work. (APSS
NO. 309 & 310)
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
for foundation of Kerb in area - B 1 x 2 119.60 0.215 0.10 5.14
for foundation of Kerb in area - C 1 x 2 56.40 0.215 0.10 2.43
for foundation of Kerb in area - D 1 x 2 38.00 0.215 0.10 1.63
for foundation of Kerb in area - E 1 x 2 17.30 0.215 0.10 0.74
for mediun area - 1 1 x 2 40.00 0.215 0.10 1.72
for mediun area - 2 1 x 2 80.00 0.215 0.10 3.44
Total Qty 249.23 Cum 910.40 1 Cum
15 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain
Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse
aggregate ) using 40mm size Hard Granite Machine Crushed Metal including
cost and conveyance of all materials like cement, sand, coarse aggregate
water etc., to site , seigniorage charges on all materials, labour charges , for
mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the
required level curing etc., complete for finished item of work.for foundation and
under flooring bed.
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
for foundation of Kerb in area - D 1 x 2 38.00 76.00
for foundation of Kerb in area - E 1 x 2 17.30 34.60
for mediun area - 1 1 x 2 40.00 80.00
for mediun area - 2 1 x 2 80.00 160.00
782.60 Rmt 286.24 1 Rmt
17 BLD-CSTN-9-4-(102) : Flooring with precast terrazzo chequered tiles
conforming to IS: 13801 Supplying precast terrazzo chequered tiles
conforming to IS:13801 using marble aggregates of size 10mm, sand, marble
powder, white cement pigments etc., with terrazzo topping not less than 6 mm
of tiles overall size not less than 20 mm thick any coloured shades. set over
base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or
RCC roof slab, including near cement slurry of honey like consistency spread
@ 3.3.kgs per sqm & jointed with neat cement to full depth mixed with pigment
of matching shade including cost of all materials like cement, sand water and
tiles etc., complete, including seigniorage charges, complete for finished item
of work, including the cost and conveyance of all materials.
for pedastal of Ambedkar statue below GL 1 x 1 3.14 0.62 1.05 2.04 Cum 3470.13 1 Cum
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
19 BLD-CSTN-6-6-(61) : Construction of CRS Masonary 2nd Sort in Cement
Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all
materials like Cement, Sand , Water, Granite Stones, including Seigniorage
Charges on all Materials, ,labour charges for cutting Stones to required size
and shape, mixing of Cement Mortor, Construction, Scaffolding Charges
curing etc., complete for finished item of Work .
for Pedastal of Ambedkar statue above GL 1 x 1 3.14 0.64 2.00 4.02 Cum
around the pedastal for ramp ( 2 x pi x r x t x h ) 1 x 6.28 2.00 1.00 0.30 3.77 Cum
7.79 Cum 4074.46 1 Cum
20 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain
Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top
surface to the required level curing etc., complete for finished item of work with
nomonal reinforcement
over pedastal for the foundation of the statue 1 x 1 3.14 0.64 0.20 0.40
around the pedastal for ramp ( 2 x pi x r x t x h ) 1 x 6.28 2.00 1.00 0.10 1.26
1.66 Cum 5044.84 1 Cum
21 Cladding to External walls with Granite stone tiles 8 mm thick (mirror polished
of all shades) using cement compatible bonding agent having acrylic emulsion
base set over 12mm thick CM (1:3) base coat and neat grey cement slurry of
honey like consistency spread at the rate of 3.3 kg.s per sq.mt including fixing
with MS clits with anticorrosive coating hold fasts and using Janatha paste and
jointed with white cement paste mixed with pigment of matching shade to
match the shade of granite slabs including cost and conveyance of all
materials and water to work site, including cost of seigniorage charges on all
materials and all operational, incidental, and labour charges such as mixing
mortar, fixing in position, including lift charges, curing, including cutting the
brick masonry walls and redoing the same such that the top surface of tiles is
to be flushed with plastered surface etc., complete for finished item of work.
(APSS No.701 & 707)
around the pedastal of Ambedkar statue ( 2pi x r x h ) 1 x 6.28 0.80 2.000 10.05
around the platform ( 2pi x r x h ) 1 x 6.28 1.80 0.300 3.39
13.44 Sqm 1458.57 1 Sqm
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
22 BLD-CSTN-9-7-(105) :Flooring with High Polished Granite 16 to 18 mm thick
up to 8'-00 (2.43 M) other than black / premium colours slabs set over base
coat of cement mortar (1:8), 20 mm thick over CC bed already laid or RCC
roof slab, including neat cement slurry of honey like consistency spread @
3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment
of matching shade to full depth, including cost of all materials like cement,
sand water and tilesetc., complete, including seigniorage charges, labour
charges for dressing of tilesetc., complete for finished item of work,including
the cost and conveyance of all materials.
23 Imporatation of good quality red earth congenial for plants grouth of light
textured, crystalline, porous and friable, generally acidic or neutral but not
alkaline, fertile, cost, transportation, loading, unloading etc complete
75% of the Total Qty 110.43 75% 83.00 Cum 1231.59 1 Cum
24 Supply at site of work well decayed farm yard manure, from any available
source, approved by the engineer in charge including screening and stacking
25% of the Total Qty 110.43 25% 28.00 Cum 1344.07 1 Cum
25 RBR-HRTC-1: Spreading of sludge farm yard manure or/ and good earth in
required thickness (cost of sludge, farm yard manure or/and good earth to be
paid for separately) as per Specification 307 MORTH
in side Greenary area and Mediuns 110.43 Cum 40.20 1 Cum
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
26 Based on Item No.2 of HMDA (FSR), Pg.31 -CARPET GRASS-KOREAN /
MEXICAN : Making lawns by Dressing the surface to the desired shape, laying
6" layer of fine red soil, covered with a thin layer of sand, watering, rolling with
hand roller (4" thckness after rolling), including the cost of red earth, sand and
labour charges and the cost of fertlizers, chemical and grass etc,. complete as
per standard practice.
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
27 Planting Speciman plants including digging of pits 60cm. Cubes, loosening of
15cm. Bottom red soil, filling with soil with 10 kg Compost + 100 DAP per pit
staking gap filling with in two month after planting.
Golden bamboo 8” 1 x 5 5 Nos 1483.91 1 No
Fercaria 2” 1 x 5 5 Nos 2069.03 1 No
Ficus 4” (Verites). 1 x 5 5 Nos 1199.88 1 No
Bottle Bush 1 x 5 5 Nos 1313.49 1 No
Sub- Total for Greenary - C
Say Rs.
DA MUNICIPALITY
ar Junction in Boduppal Municipality
ABSTRACT ESTIMATION
Amount
#REF!
#REF!
#REF!
#REF!
Amount
#REF!
Amount
#REF!
#REF!
#REF!
Amount
#REF!
#REF!
#REF!
Amount
#REF!
#REF!
#REF!
#REF!
Amount
84840.46
Amount
226898.99
661335.59
Amount
224011.00
712156.05
7079.07
Amount
31740.04
8374.43
19603.18
Amount
65993.21
30000.00
2072032.02
102221.97
37633.96
4439.29
Amount
166144.82
Amount
7419.55
10345.15
5999.40
6567.45
340771.59
#REF!
#REF!
#REF!
#REF!
Estimate for providing of Central lighting in side the Median
S.No Description of Work Nos L Qty Rate Per
1 Earth work excavation of Trench in hard ground soil, laying of U.G cables upto 50 Sq,mm on sand cushion covering the cable with bricks and back filling of Trench duly providin
2 Material and labour for Cement Concrete (1:2:4) Type B2 using 20 mm graded stone aggregate
as in foundations and coping of poles complete all as specified and as directed by Project
Manager
1 x 40 40 Cum 7376.60 1 Cum
3 ELEC-7.2.3 : Fabrication, Transportation and supply of hot-dip galvanized Octogonal Pole with
BSEN -10025 grade S 355 JO steel plate for shaft, IS 2062 for base plate with door opening
arrangement, including the supply of suitable boards with bakelite sheet and MCB's as per IS
specification suitable to withstand the wind speed of 180 KMPH for 9mtrs height Pole having
dimensions Bottom 155mm, Top 70mm with 3mm thick, base plate 260 x260 x16mm and 4 Nos
of M24 x 750 long 'J' bolts along with template of Makes: Bajaj / Valmont / TRANSRAIL
5 Fabrication supply and errection of water tight M.S junction Box 260 x 300 x 140 mm (depth) size
and 16 guage MS sheet with fixing arrangements, with necessary holes for cable entry and exit
from the box. The box shall be provided with cover and hinges on one side and bolting at other
end. The box shall be fixed by clamps fabricated from 25mm x 3mm MS flat. The box consisting of
2 Nos of MCB and 1 No of 60 AMPS ‘L’ way consider doubl arm and box shall be painted with one
coat of Red Oxide and two coats aluminium paint including transportation etc., complete for
finished item of work.
6 Providing independent earthing for sophisticated equipment like computer medical Equipment,
Electronic Gadgets etc., with 600mm x 600mm x3.15 mm thick copper plate rigidly fixed to the
40mm dia GI pipe of 2.5 Mtrs. Length and 19mm dia ‘B’ class GI pipe of 0.3 M long connected
with reducer providing GI funnel covers with wire mesh of suitable size staggered holes of 16 Nos
of 12mm dia to the earht electrode, enclosed in a CC chamber of 400mm x 400mm x 400mm
covered with reinforced cement concrete cover and all labour charges RCC slab cover duly filing
salt and charcoal in layers from the bottom of the earth pit, giving earth connections from the
electrodes to GI strip 25 x 6 x 200mm length provided with holes GI washers, boths and labour
charges etc., complete.
LS
9 CC (1:2:4) prop. providing CC blocks of size 0.45 x 1.20 mts. base and 0.45 mt. As high tapered
to 0.35 to a hight 0.3 mts. from base and 0.23 mts. from 0.35 to top of the block for road divider
using 20mm HG machine crushed metal machine mixing and vibrating and laying in the steel
certering box including all cost and conveyance of all materials and labour charges and curing
etc., complete.
1 x 1 1 No 509.19 1 Each
10 ELEC-3.5.1: Supply & Installtion of Automatic Street Light Control System with Optical Sensor,
Low volatage / High voltage trip and reset, operating voltage 150 - 280V AC, 50 HZ with suitable
SMC enclousure of IP 54 protection, MCBs and contactor suitable to control the load of 3 KW of
single phase load with necessary clamping arrangements. Makes : Swadeep Nature Switch /
Light Mate.
LS provisions Each
Total Amount Rs.
SAY
1 Fabrication, Transportation and supply of hot-dip galvanized Octogonal Pole with BSEN - 10025 7.2.3
grade S 355 JO steel plate for shaft, IS 2062 for base plate with door opening arrangement,
including the supply of suitable boards with bakelite sheet and MCB's as per IS specification
suitable to withstand the wind speed of 180 KMPH for 9 Mtrs height Pole having dimensions
Bottom 155 mm,. Top 70mm with 3mm thick, base plate 220 x 220 x12mm and 4 Nos of M24 x
750 long 'J' bolts along with template of Makes : Surya / LAASMA
#REF!
#REF!
of Central lighting in side the Median
Amount
295064.00
496906.56
118160.00
209415.17
39765.25
Amount
224321.37
Amount
15426.00
443098.40
Amount
96000.00
Amount
509.19
200000.00
2138665.94
21.39 Lakhs
3 ELEC-1.1.3 Supply of ISI, 32mm dia,16 guage thickness MS conduit pipe 1 Mtr
of makes NAI / Bharath / GB.
4 ELEC-1.1.4 Supply of ISI, 38mm dia, 16 guage thickness MS conduit pipe 1 Mtr
of makes NAI / Bharath / GB.
5 ELEC-1.1.5 Supply of ISI, 50mm dia,16 guage thickness MS conduit pipe 1 Mtr
of makes NAI / Bharath / GB.
30 ELEC-1.1.30 Supply of MS Inspection 10 Guage G.I. checknut size 25mm. 100 Nos
31 ELEC-1.1.31 Supply of MS Inspection 10 Guage G.I. checknut size 32mm. 100 Nos
33 ELEC-1.1.33 Supply of MS Inspection 10 Guage G.I. checknut size 50mm. 100 Nos
53 ELEC-1.2.2 Supply of ISI 20mm outer dia heavy (2.10mm thickness) 1 Mtr
grade with IS:9537 part 3 regid PVC pipe of makes
Sudhakar / Maco Plast / Modi.
54 ELEC-1.2.3 Supply of ISI 25mm outer dia medium (1.80mm thickness) 1 Mtr
grade with IS:9537 part 3 regid PVC pipe of makes
Sudhakar / Maco Plast / Modi.
55 ELEC-1.2.4 Supply of ISI 25mm outer dia heavy (2.20mm thickness) 1 Mtr
grade with IS:9537 part 3 regid PVC pipe of makes
Sudhakar / Maco Plast / Modi.
56 ELEC-1.2.5 Supply of ISI 32mm outer dia medium (2.10mm thickness) 1 Mtr
grade with IS:9537 part 3 regid PVC pipe of makes
Sudhakar / Maco Plast / Modi.
57 ELEC-1.2.6 Supply of ISI 40mm outer dia medium (2.30mm thickness) 1 Mtr
grade with IS:9537 part 3 regid PVC pipe of makes
Sudhakar / Maco Plast / Modi.
58 ELEC-1.2.7 Supply of ISI 50mm outer dia medium (2.85mm thickness) 1 Mtr
grade with IS:9537 part 3 regid PVC pipe of makes
Sudhakar / Maco Plast / Modi.
59 ELEC-1.2.8 Supply of Non - ISI 19mm 1.50mm thick regid PVC pipe of 1 Mtr
makes Million Plast / Sudhakar / Durga / Nandi / Sunlight /
Besto Plast.
60 ELEC-1.2.9 Supply of Non - ISI 25mm 1.80mm thick regid PVC pipe of 1 Mtr
makes Million Plast / Sudhakar / Durga / Nandi / Sunlight /
Besto Plast.
61 ELEC-1.2.10 Supply of Non - ISI 19/20mm width and 12.5mm height 1 Mtr
Casing and Caping makes :Modi with ISI
62 ELEC-1.2.11 Supply of Non - ISI 25mm width and 12.5mm height Casing 1 Mtr
and Caping makes :Modi with ISI
63 ELEC-1.2.12 Supply of Non - ISI 32mm width and 12.5mm height Casing 1 Mtr
and Caping makes :Modi with ISI
64 ELEC-1.2.13 Supply of Non - ISI 38/40mm width and 12.5mm height 1 Mtr
Casing and Caping makes :Modi with ISI
65 ELEC-1.2.14 Supply of Non - ISI 19/20mm width and 12.5mm height 1 Mtr
Casing and Caping makes :Dimond / Durga
66 ELEC-1.2.15 Supply of Non - ISI 25mm width and 12.5mm height Casing 1 Mtr
and Caping makes :Dimond / Durga
METALLIC BOXES
106 ELEC-1.3.7 Supply of 4" x 4" Metal Box 1 No
SWITCH BOARDS
119 ELEC-1.4.8 Supply of Decolam Board of Size 4" x 4" 1 No
137 ELEC-1.5.1 Supply of 14/0.3mm (1.0 Sqmm) FRLS / HFFR PVC 100 Mtrs
insulated 1100V grade as perIS:694/1990 specification for
Copper cable of makes Finolex / RR kabel / Havells
ELEC-1.5.2 Supply of 22/0.3mm (1.5 Sqmm) FRLS / HFFR PVC 100 Mtrs
insulated 1100V grade as perIS:694/1990 specification for
Copper cable of makes Finolex / RR kabel / Havells
ELEC-1.5.3 Supply of 36/0.3mm (2.5 Sqmm) FRLS / HFFR PVC 100 Mtrs
insulated 1100V grade as perIS:694/1990 specification for
Copper cable of makes Finolex / RR kabel /Havells
138 ELEC-1.5.4 Supply of 56/0.3mm (4.0 Sqmm) FRLS / HFFR PVC 100 Mtrs
insulated 1100V grade as perIS:694/1990 specification for
Copper cable of makes Finolex / RR kabel /Havells
ELEC-1.5.5 Supply of 84/0.3mm (6.0 Sqmm) FRLS / HFFR PVC 100 Mtrs
insulated 1100V grade as perIS:694/1990 specification for
Copper cable of makes Finolex / RR kabel / Havells
ELEC-1.5.6 Supply of 140/0.3mm (10.0 Sqmm) PVC FRLS / HFFR 100 Mtrs
insulated flexible Copper cable of makes Finolex / RR kabel /
Havells
139 ELEC-1.5.7 Supply of 126/0.4mm (16.0 Sqmm) PVC FRLS / HFFR 100 Mtrs
insulated flexible Copper cable of makes Finolex / RR kabel /
Havells
ELEC-1.5.8 Supply of 14/0.3mm (1.0 Sqmm) FRLS PVC insulated 1100V 100 Mtrs
grade as perIS:694/1990 specification for Copper cable of
makes Ploycab / Havells / Sun Cab / Gold Medal / Million /
Fortune Art / Paragon / HPL / L&T / Power Flex / RPG /
Anchor / Bonton.
ELEC-1.5.9 Supply of 22/0.3mm (1.5 Sqmm) FRLS PVC insulated 1100V 100 Mtrs
grade as perIS:694/1990 specification for Copper cable of
makes Ploycab / Havells / Sun Cab / Gold Medal / Million /
Fortune Art / Paragon / HPL / L&T / Power Flex / RPG /
Anchor / Bonton.
140 ELEC-1.5.10 Supply of 36/0.3mm (2.5 Sqmm) FRLS PVC insulated 1100V 100 Mtrs
grade as perIS:694/1990 specification for Copper cable of
makes Ploycab / Havells / Sun Cab / Gold Medal / Million /
Fortune Art / Paragon / HPL / L&T / Power Flex / RPG /
Anchor / Bonton.
ELEC-1.5.11 Supply of 56/0.3mm (4.0 Sqmm) FRLS PVC insulated 1100V 100 Mtrs
grade as perIS:694/1990 specification for Copper cable of
makes Ploycab / Havells / Sun Cab / Gold Medal / Million /
Fortune Art / Paragon / HPL / L&T / Power Flex / RPG /
Anchor / Bonton.
ELEC-1.5.12 Supply of 84/0.3mm (6.0 Sqmm) FRLS PVC insulated 1100V 100 Mtrs
grade as perIS:694/1990 specification for Copper cable of
makes Ploycab / Havells / Sun Cab / Gold Medal / Million /
Fortune Art / Paragon / HPL / L&T / Power Flex / RPG /
Anchor / Bonton.
141 ELEC-1.5.13 Supply of 140/0.3mm (10.0 Sqmm) FRLS PVC insulated 100 Mtrs
flexible Copper cable of makes Ploycab / Havells / Sun Cab /
Gold Medal / Million / Fortune Art / Paragon / HPL / L&T /
Power Flex / RPG / Anchor / Bonton.
ELEC-1.5.14 Supply of 126/0.4mm (16.0 Sqmm) PVC FRLS insulated 100 Mtrs
flexible Copper cable of makes Ploycab / Havells / Sun Cab /
Gold Medal / Million / Fortune Art / Paragon / HPL / L&T /
Power Flex / RPG / Anchor / Bonton.
ELEC-1.5.15 Supply of 14/0.3mm (1.0 Sqmm) FR / FRLS PVC insulated 100 Mtrs
1100V grade as perIS:694/1990 specification for Copper
cable of makes Pawancab / Nakoda / Star / Milltec / Fine
Cab / Payal / Sunlight / Bentec / Gemscab / Vimal / V-Guard /
Standard / Gloster.
142 ELEC-1.5.16 Supply of 22/0.3mm (1.5 Sqmm)FR / FRLS PVC insulated 100 Mtrs
1100V grade as perIS:694/1990 specification for Copper
cable of makes Pawancab / Nakoda / Star / Milltec / Fine
Cab / Payal / Sunlight / Bentec / Gemscab / Vimal / V-Guard /
Standard / Gloster.
ELEC-1.5.17 Supply of 36/0.3mm (2.5 Sqmm) FR / FRLS PVC insulated 100 Mtrs
1100V grade as perIS:694/1990 specification for Copper
cable of makes Pawancab / Nakoda / Star / Milltec / Fine
Cab / Payal / Sunlight / Bentec / Gemscab / Vimal / V-Guard /
Standard / Gloster.
ELEC-1.5.18 Supply of 56/0.3mm (4.0 Sqmm) FR / FRLS PVC insulated 100 Mtrs
1100V grade as perIS:694/1990 specification for Copper
cable of makes Pawancab / Nakoda / Star / Milltec / Fine
Cab / Payal / Sunlight / Bentec / Gemscab / Vimal / V-Guard /
Standard / Gloster.
143 ELEC-1.5.19 Supply of 84/0.3mm (6.0 Sqmm) FR / FRLS PVC insulated 100 Mtrs
1100V grade as perIS:694/1990 specification for Copper
cable of makes Pawancab / Nakoda / Star / Milltec / Fine
Cab / Payal / Sunlight / Bentec / Gemscab / Vimal / V-Guard /
Standard / Gloster.
ELEC-1.5.20 Supply of 140/0.3mm (10.0 Sqmm) FR / FRLS PVC insulated 100 Mtrs
1100V grade as perIS:694/1990 specification for Copper
cable of makes Pawancab / Nakoda / Star / Milltec / Fine
Cab / Payal / Sunlight / Bentec / Gemscab / Vimal / V-Guard /
Standard / Gloster.
ELEC-1.5.21 Supply of 126/0.4mm (16.0 Sqmm) FR / FRLS PVC insulated 100 Mtrs
1100V grade as perIS:694/1990 specification for Copper
cable of makes Pawancab / Nakoda / Star / Milltec / Fine
Cab / Payal / Sunlight / Bentec / Gemscab / Vimal / V-Guard /
Standard / Gloster.
ELEC-1.6.2 Supply of 6 Sqmm WPSC (Weather Proof Single Core) ISI 100 Mtrs
Alluminium Wire of makes Polycab / V-Guard / Million /
Payal / Nakoda / Vimal.
ELEC-1.6.3 Supply of 10 Sqmm WPSC (Weather Proof Single Core) ISI 100 Mtrs
Alluminium Wire of makes Polycab / Gold Medal / Million /
Payal / Nakoda.
ELEC-1.6.4 Supply of 16 Sqmm WPSC (Weather Proof Single Core) ISI 100 Mtrs
Alluminium Wire of makes Polycab / Gold Medal / Million /
Payal / Nakoda.
ELEC-1.6.5 Supply of 6 Sqmm WPTC (Weather Proof Twin Core) ISI 100 Mtrs
Alluminium Wire of makes Polycab / V-Guard / Million / Payal /
Nakoda / Vimal.
ELEC-1.6.6 Supply of 10 Sqmm WPTC (Weather Proof Twin Core) ISI 100 Mtrs
Alluminium Wire of makes Polycab / Gold Medal / Million /
Payal / Nakoda.
ELEC-1.6.7 Supply of 16 Sqmm WPTC (Weather Proof Twin Core) ISI 100 Mtrs
Alluminium Wire of makes Polycab / Gold Medal / Million /
Payal / Nakoda.
ELEC-1.6.8 Supply of 23 / 0060 twin core twisted / flat heavy Copper wire 100 Mtrs
of makes Polycab / Gold Medal / Million / Payal /Nakoda.
ELEC-1.6.9 Supply of 3 Core 1.5 Sqmm Flat Copper cable of ISI for 100 Mtrs
Submersible Motors of makes Polycab / Gold Medal /
Million / Payal / Nakoda.
ELEC-1.6.10 Supply of 3 Core 2.5 Sqmm Flat Copper cable as per IS 100 Mtrs
694:1990 for Submersible Motors of makes Polycab / Gold
Medal / Million / Payal / Havells / Nakoda.
ELEC-1.6.11 Supply of 3 Core 4.0 Sqmm Flat Copper cable as per IS 100 Mtrs
694:1990 for Submersible Motors of makes Polycab / Gold
Medal / Million / Payal / Havells / Nakoda.
ELEC-1.6.12 Supply of 3 Core 6.0 Sqmm Flat Copper cable as per IS 100 Mtrs
694:1990 for Submersible Motors of makes Polycab / Gold
Medal / Million / Payal / Havells / Nakoda.
ELEC-1.6.13 Supply of 3 Core 10.0 Sqmm Flat Copper cable as per IS 100 Mtrs
694:1990 for Submersible Motors of makes Polycab / Gold
Medal / Million / Payal / Havells / Nakoda.
ELEC-1.6.14 Supply of 3 Core 1.5 Sqmm Flat Copper cable of ISI for 100 Mtrs
Submersible Motors of makes Finolex / RR Kabel / Havells /
Vimal
ELEC-1.6.15 Supply of 3 Core 2.5 Sqmm Flat Copper cable as per IS 100 Mtrs
694:1990 for Submersible Motors of makes Finolex / RR
Kabel / Havells / Vimal
ELEC-1.6.16 Supply of 3 Core 4.0 Sqmm Flat Copper cable as per IS 100 Mtrs
694:1990 for Submersible Motors of makes Finolex / RR
Kabel / Havells / Vimal
ELEC-1.6.17 Supply of 3 Core 6.0 Sqmm Flat Copper cable as per IS 100 Mtrs
694:1990 for Submersible Motors of makes Finolex / RR
Kabel / Havells / Vimal
ELEC-1.6.18 Supply of 3 Core 10.0 Sqmm Flat Copper cable as per IS 100 Mtrs
694:1990 for Submersible Motors of makes Finolex / RR
Kabel / Havells / Vimal
26 ELEC-1.7.4 Supply of 6A 3/2 pin flush type Socket with shutter of makes 1 No
Gold Medal Olive/ Million Zoom /Anchor Penta Cherry.
30 ELEC-1.7.8 Supply of 16A flush type Swich of makes Gold Medal Olive 1 No
/Million Zoom / Anchor Penta Cherry.
31 ELEC-1.7.9 Supply of 16A flush type Socket with shutter of makes Gold 1 No
Medal Olive / Million Zoom / Anchor Penta Cherry.
33 ELEC-1.7.11 Supply of 16A Triangle Plug Top of makes Gold Medal Olive 1 No
/ Million Zoom / Anchor Penta Cherry.
100 ELEC-1.9.22 Supply of 6A / 10A Modular Bell Push with Neon Indicator 1 No
of Cabtree Thames Platinum / GM / Million / Anchor Roma
viola / Toyoma / L&T / Fortune Art / CPL.
101 ELEC-1.9.23 Supply of 16A / 10A Modular Flush Fuse with Neon 1 No
Indicator of Cabtree Thames Platinum / GM / Million /
Anchor Roma viola / Toyoma / L&T / Fortune Art / CPL.
102 ELEC-1.9.24 Supply of 16A / 20A 1 Way Modular Switch of Cabtree 1 No
Thames Platinum / GM / Million / Anchor Roma viola /
Toyoma / L&T / Fortune Art / CPL.
SECTION - 2
2.1 PANEL MOUNTING SWITCH DISCONNECTOR FUSE
UNITS ( SDFU ) AS PER IS: 13947
123 ELEC-2.1.1 Supply of 32A TPN Switch Disconnector Fuse Unit Cubical 1 No
type without fuses of makes L&T/ G E / C&S / ABB /
SIEMENS
124 ELEC-2.1.2 Supply of 63A TPN Switch Disconnector Fuse Unit Cubical 1 No
type without fuses of makes L&T / G E / C&S / ABB /
SIEMENS
125 ELEC-2.1.3 Supply of 125A TPN Switch Disconnector Fuse Unit Cubical 1 No
type without fuses of makes L&T / G E / C&S / ABB /
SIEMENS
126 ELEC-2.1.4 Supply of 200A TPN Switch Disconnector Fuse Unit Cubical 1 No
type without fuses of makes L&T/ G E / C&S / ABB /
SIEMENS
127 ELEC-2.1.5 Supply of 250A TPN Switch Disconnector Fuse Unit Cubical 1 No
type without fuses of makes L&T / G E / C&S / ABB /
SIEMENS
128 ELEC-2.1.6 Supply of 400A TPN Switch Disconnector Fuse Unit Cubical 1 No
type without fuses of makes L&T / G E / C&S / ABB /
SIEMENS
129 ELEC-2.1.7 Supply of 630A TPN Switch Disconnector Fuse Unit Cubical 1 No
type without fuses of makes L&T / G E / C&S / ABB /
SIEMENS
130 ELEC-2.1.8 Supply of 32A TPN Switch Disconnector Fuse Unit Cubical 1 No
type without fuses of makes Standard / Crystal / Havells /
HPL.
131 ELEC-2.1.9 Supply of 63A TPN Switch Disconnector Fuse Unit Cubical 1 No
type without fuses of makes Standard / Crystal / Havells /
HPL.
132 ELEC-2.1.10 Supply of 125A TPN Switch Disconnector Fuse Unit Cubical 1 No
type without fuses of makes Standard / Crystal / Havells /
HPL.
133 ELEC-2.1.11 Supply of 200A TPN Switch Disconnector Fuse Unit Cubical 1 No
type without fuses of makes Standard / Crystal / Havells /
HPL.
134 ELEC-2.1.12 Supply of 250A TPN Switch Disconnector Fuse Unit Cubical 1 No
type without fuses of makes Standard / Crystal / Havells /
HPL.
135 ELEC-2.1.13 Supply of 400A TPN Switch Disconnector Fuse Unit Cubical 1 No
type without fuses of makes Standard / Crystal / Havells /
136 ELEC-2.1.14 Supply of 630A TPN Switch Disconnector Fuse Unit Cubical 1 No
type without fuses of makes Standard / Crystal / Havells /
HPL.
138 ELEC-2.2.2 Supply of 125A 4 Pole Change Over Switch on Load with 1 No
open Execution of makes HPL Socomec / L & T
139 ELEC-2.2.3 Supply of 200A 4 Pole Change Over Switch on Load with 1 No
open Execution of makes HPL Socomec / L & T
140 ELEC-2.2.4 Supply of 250A 4 Pole Change Over Switch on Load with 1 No
open Execution of makes HPL Socomec / L & T
141 ELEC-2.2.5 Supply of 400A 4 Pole Change Over Switch on Load with 1 No
open Execution of makes HPL Socomec / L & T
142 ELEC-2.2.6 Supply of 630A 4 Pole Change Over Switch on Load with 1 No
open Execution of makes HPL Socomec / L & T
143 ELEC-2.2.7 Supply of 63A 4 Pole Change Over Switch on Load with 1 No
open Execution of makes ABB / GE / SIEMENS / Standard /
Crystal / Havells.
144 ELEC-2.2.8 Supply of 125A 4 Pole Change Over Switch on Load with 1 No
open Execution of makes ABB / GE / SIEMENS / Standard /
Crystal / Havells.
145 ELEC-2.2.9 Supply of 200A 4 Pole Change Over Switch on Load with 1 No
open Execution of makes ABB / GE / SIEMENS / Standard /
Crystal / Havells.
146 ELEC-2.2.10 Supply of 250A 4 Pole Change Over Switch on Load with 1 No
open Execution of makes ABB / GE / SIEMENS / Standard /
Crystal / Havells.
147 ELEC-2.2.11 Supply of 400A 4 Pole Change Over Switch on Load with 1 No
open Execution of makes ABB / GE / SIEMENS / Standard /
Crystal / Havells.
148 ELEC-2.2.12 Supply of 630A 4 Pole Change Over Switch on Load with 1 No
open Execution of makes ABB / GE / SIEMENS / Standard /
Crystal / Havells.
149 ELEC-2.2.13 Supply of 32A 4 Pole Change Over Switch on Load with 1 No
open Execution of makes ABB / GE / SIEMENS / Standard /
Crystal / Havells.
151 ELEC-2.3.2 Supply of 63A 415V FP Off load Changeover Switch in sheet 1 No
steel enclosure of makes HPL / Havells / Standard. / Crystal.
153 ELEC-2.3.4 Supply of 32A 240V DP Off load Changeover Switch in sheet 1 No
steel enclosure of makes Million / Sputnik / Sunlight /
Bentec / Gold Medal / Star.
154 ELEC-2.3.5 Supply of 63A 415V FP Off load Changeover Switch in sheet 1 No
steel enclosure of makes Million / Sputnik / Sunlight /
Bentec / Gold Medal / Star.
155 ELEC-2.3.6 Supply of 100A 415V FP Off load Changeover Switch in 1 No
sheet steel enclosure of makes Million / Sputnik / Sunlight /
Bentec / Gold Medal.
169 ELEC-2.5.2 Supply of 32A to 63A HRC Fuse Links of makes L & T / G E / 1 No
C & S / Standard / HPL / Havells.
170 ELEC-2.5.3 Supply of 125A to 200A HRC Fuse Links of makes L & T / G 1 No
E/ C & S / Standard / HPL / Havells.
171 ELEC-2.5.4 Supply of 250A to 350A HRC Fuse Links of makes L & T / G 1 No
E/ C & S / Standard / HPL / Havells.
172 ELEC-2.5.5 Supply of 400A HRC Fuse Links of makes L & T / G E / C & 1 No
S/ Standard / HPL / Havells.
173 ELEC-2.5.6 Supply of 630A HRC Fuse Links of makes L & T / G E / C & S 1 No
/ Standard / HPL / Havells.
178 ELEC-2.6.5 Supply of 200A 415V Porcelain Rewirable Fuse Units with 1 No
extension strip of makes Gold Medal / Million /HPL /
Sputnik / Vimal / Standard / Star / Sunlight / Crystal / Bentec
179 ELEC-2.6.6 Supply of 300A 415V Porcelain Rewirable Fuse Units with 1 No
extension strip of makes Gold Medal / Million /HPL / Sputnik /
Vimal / Standard / Star/ Sunlight / Crystal /Bentec
200 ELEC-2.8.17 Supply of 630A 4 Pole, 50kA Air Circuit Breaker electrically 1 No
fixed Confirms to IS 13947-2, IEC 60947-2 and BS-EN 60947
with Micro processer based having over load, shot circuit and
earth fault Protection of Siemens / L&T make.
201 ELEC-2.8.18 Supply of 630A 3 Pole, 50kA Air Circuit Breaker electrically 1 No
drawout Confirms to IS 13947-2, IEC 60947-2 and BS-EN
60947 with Micro processer based having over load, shot
circuit and earth fault Protection of Siemens / L&T make.
202 ELEC-2.8.19 Supply of 630A 4 Pole, 50kA Air Circuit Breaker electrically 1 No
drawout Confirms to IS 13947-2, IEC 60947-2 and BS-EN
60947 with Micro processer based having over load, shot
circuit and earth fault Protection of Siemens / L&T make.
203 ELEC-2.8.20 Supply of 800A 3 Pole, 50kA Air Circuit Breaker electrically 1 No
drawout Confirms to IS 13947-2, IEC 60947-2 and BS-EN
60947 with Micro processer based having over load, shot
circuit and earth fault protection of makes Siemens / L&T /
Schneider make.
204 ELEC-2.8.21 Supply of 800A 4 Pole, 50kA Air Circuit Breaker electrically 1 No
drawout Confirms to IS 13947-2, IEC 60947-2 and BS-EN
60947 with Micro processer based having over load, shot
circuit and earth fault protection of makes Siemens / L&T /
Schneider make.
205 ELEC-2.8.22 Supply of 1000A 3 Pole, 50kA Air Circuit Breaker electrically 1 No
drawout Confirms to IS 13947-2, IEC 60947-2 and BS-EN
60947 with Micro processer based having over load, shot
circuit and earth fault protection of makes Siemens / L&T /
Schneider / ABB make.
206 ELEC-2.8.23 Supply of 1000A 4 Pole, 50kA Air Circuit Breaker electrically 1 No
drawout Confirms to IS 13947-2, IEC 60947-2 and BS-EN
60947 with Micro processer based having over load, shot
circuit and earth fault protection of makes Siemens / L&T /
Schneider / ABB make.
207 ELEC-2.8.24 Supply of 630A 3 Pole, 50kA Air Circuit Breaker electrically 1 No
fixed Confirms to IS 13947-2, IEC 60947-2 and BS-EN 60947
with Micro processer based having over load, shot circuit and
earth fault Protection of ABB / Legrand / HPL / Indo
Asian make.
208 ELEC-2.8.25 Supply of 630A 3 Pole, 50kA Air Circuit Breaker electrically 1 No
drawout Confirms to IS 13947-2, IEC 60947-2 and BS-EN
60947 with Micro processer based having over load, shot
circuit and earth fault Protection of ABB / Legrand / HPL / Indo
Asian make.
209 ELEC-2.8.26 Supply of 630A 4 Pole, 50kA Air Circuit Breaker electrically 1 No
fixed Confirms to IS 13947-2, IEC 60947-2 and BS-EN
60947 with Micro processer based having over load, shot
circuit and earth fault Protection of ABB / Legrand / HPL / Indo
Asian make.
210 ELEC-2.8.27 Supply of 630A 4 Pole, 50kA Air Circuit Breaker electrically 1 No
drawout Confirms to IS 13947-2, IEC 60947-2 and BS-EN
60947 with Micro processer based having over load, shot
circuit and earth fault Protection of ABB / Legrand / HPL / Indo
Asian make.
211 ELEC-2.8.28 Supply of 800A 3 Pole, 50kA Air Circuit Breaker electrically 1 No
drawout Confirms to IS 13947-2, IEC 60947-2 and BS-EN
60947 with Micro processer based having over load, shot
circuit and earth fault protection of makes ABB / GE / Legrand
/ HPL make.
212 ELEC-2.8.29 Supply of 800A 4 Pole, 50kA Air Circuit Breaker electrically 1 No
drawout Confirms to IS 13947-2, IEC 60947-2 and BS-EN
60947 with Micro processer based having over load, shot
circuit and earth fault protection of makes ABB / GE / Legrand
/ HPL make.
214 ELEC-2.8.31 Supply and Fixing of Spring suspension hanger for rising Main 1 No
for 400A / 800A Raising Mains. Makes:- Legrand / L&T /
Seimens / Schiender / GE make)
215 ELEC-2.8.32 Supply and Fixing of Suspension brackets for rising main for 1 No
400A / 800A Raising Mains Makes:- Legrand / L&T / Seimens
/ Schiender / GE make)
216 ELEC-2.8.33 Supply and Fixing of 800 Amps Horizontal / Vertical bends 1 No
Makes:- Legrand / L&T / Seimens / Schiender / GE make)
217 ELEC-2.8.34 Supply and Fixing of Adopter box for 400A / 800A Raising 1 No
Mains Makes:- Legrand / L&T / Seimens / Schiender / GE
make)
218 ELEC-2.8.35 Supply and Fixing of 800 Amps Copper Flexibles for three 1 No
phases and neutral Makes:- Legrand / L&T / Seimens /
Schiender / GE make)
219 ELEC-2.8.36 Supply, instalation, testing and commisioning of 400 Amp, 1 No
50KA breaking capacity (100% Neutral busbar) air
insulated compact Raising mains system made of CRCA
sheet steel encloser of thickness not less than 1.5 mm having
degree of protection of IP 55 as per 2127. wall strapes, fully
PVC insulated four strip ALUMINIUM busbar in convinent
sections including required end feed unit, end cover units
suitable for 415 volts 3 phase, 4 wire, 50 Hz A.C. System,
etc., Makes:- Legrand / L&T / Seimens /Schiender / GE make)
220 ELEC-2.8.37 Supply and Fixing of 400 Amps Horizontal / Vertical bends 1 No
Makes:- Legrand / L&T / Seimens / Schiender / GE make)
221 ELEC-2.8.38 Supply and Fixing of 400 Amps Copper Flexibles for three 1 No
phases and neutral Makes:- Legrand / L&T / Seimens /
Schiender / GE make)
222 ELEC-2.8.39 Supply and Fixing of 400 Amps Tap off box Makes:- 1 No
Legrand / L&T / Seimens / Schiender / GE make)
223 ELEC-2.8.40 Supply and Fixing of 250 Amps Tap off box Makes:- 1 No
Legrand / L&T / Seimens / Schiender / GE make)
224
2.9 MCBs (AS PER IS:8828)
225 ELEC-2.9.1 Supply of 6-32A 10KA SP MCB, C/D Curve ISI Mark of make 1 No
Legrand / Schneider.
226 ELEC-2.9.2 Supply of 40-63A 10KA SP MCB, C/D Curve ISI Mark of make 1 No
Legrand / Schneider.
227 ELEC-2.9.3 Supply of 6-32A 10KA DP MCB, C/D Curve ISI Mark of make 1 No
Legrand / Schneider.
228 ELEC-2.9.4 Supply of 40-63A 10KA DP MCB, C/D Curve ISI Mark of make 1 No
Legrand / Schneider.
229 ELEC-2.9.5 Supply of 6-32A 10KA TP MCB, C/D Curve ISI Mark of make 1 No
Legrand / Schneider.
230 ELEC-2.9.6 Supply of 40-63A 10KA TP MCB, C/D Curve ISI Mark of make 1 No
Legrand / Schneider.
231 ELEC-2.9.7 Supply of 6-32A 10KA FP MCB, C/D Curve ISI Mark of make 1 No
Legrand / Schneider.
232 ELEC-2.9.8 Supply of 40-63A FP MCB, C/D Curve ISI Mark of make 1 No
Legrand / Schneider.
233 ELEC-2.9.9 Supply of 6-32A 10KA SP MCB, C/D Curve ISI Mark of make 1 No
L&T Exora / Siemens / GE / ABB / Standard / Havells / HPL /
Indo Asian / Toyoma.
234 ELEC-2.9.10 Supply of 40-63A 10KA SP MCB, C/D Curve ISI Mark of make 1 No
L&T Exora / Siemens / GE / ABB / Standard / Havells / HPL /
Indo Asian / Toyoma.
235 ELEC-2.9.11 Supply of 6-32A 10KA DP MCB, C/D Curve ISI Mark of make 1 No
L&T Exora / Siemens / GE / ABB / Standard / Havells / HPL /
Indo Asian / Toyoma.
236 ELEC-2.9.12 Supply of 40-63A 10KA DP MCB, C/D Curve ISI Mark of make 1 No
L&T Exora / Hager / Siemens / GE / ABB / Standard / Havells
/ HPL / Indo Asian / Toyoma.
237 ELEC-2.9.13 Supply of 6-32A 10KA TP MCB, C/D Curve ISI Mark of make 1 No
L&T Exora / Hager / Siemens / GE / ABB / Standard /
Havells / HPL / Indo Asian / Toyoma.
238 ELEC-2.9.14 Supply of 40-63A 10KA TP MCB, C/D Curve ISI Mark of make 1 No
L&T Exora / Hager / Siemens / GE / ABB / Standard /
Havells / HPL / Indo Asian / Toyoma.
239 ELEC-2.9.15 Supply of 6-32A 10KA FP MCB, C/D Curve ISI Mark of make 1 No
L&T Exora / Hager / Siemens / GE / ABB / Standard /
Havells / HPL / Indo Asian / Toyoma.
240 ELEC-2.9.16 Supply of 40 - 63A 10KA FP MCB, C/D Curve ISI Mark of 1 No
make L&T Exora / Hager / Siemens / GE / ABB / Standard /
Havells / HPL / Indo Asian / Toyoma.
241 ELEC-2.9.17 Supply of 6-32A 10KA SP MCB, C/D Curve ISI Mark of make 1 No
Gold Medal / Milltec / Sputnik / Crystal / Bentec.
242 ELEC-2.9.18 Supply of 40-63A 10KA SP MCB, C/D Curve ISI Mark of make 1 No
Gold Medal / Milltec / Sputnik / Crystal / Bentec.
243 ELEC-2.9.19 Supply of 6-32A 10KA DP MCB, C/D Curve ISI Mark of make 1 No
Gold Medal / Milltec / Sputnik / Crystal / Bentec.
244 ELEC-2.9.20 Supply of 40-63A 10KA DP MCB, C/D Curve ISI Mark C- 1 No
Curve of make Gold Medal / Milltec / Sputnik / Crystal /
Bentec.
245 ELEC-2.9.21 Supply of 6-32A 10KA TP MCB, C/D Curve ISI Mark of make 1 No
Gold Medal / Milltec / Sputnik / Crystal / Bentec.
246 ELEC-2.9.22 Supply of 40 - 63A 10KA TP MCB, C/D Curve ISI Mark of 1 No
make Gold Medal / Milltec / Sputnik / Crystal / Bentec.
247 ELEC-2.9.23 Supply of 6-32A 10KA FP MCB, C/D Curve ISI Mark of make 1 No
Gold Medal / Milltec / Sputnik / Crystal / Bentec.
248 ELEC-2.9.24 Supply of 40 - 63A 10KA FP MCB, C/D Curve ISI Mark of 1 No
make Gold Medal / Milltec / Sputnik / Crystal / Bentec.
2.10 ISOLATORS
249 ELEC-2.10.1 Supply of 32A DP Isolator of make Legrand / Schneider. 1 No
279 ELEC-2.11.9 Supply of 40A 2 Pole RCCB 30mA, of makes L&T Exora / 1 No
Siemens / GE / ABB / Standard / Havells / HPL / Indo Asian /
Toyoma.
280 ELEC-2.11.10 Supply of 63A 2 Pole RCCB 30mA, of makes L&T Exora / 1 No
Siemens / GE / ABB / Standard / Havells / HPL / Indo Asian /
Toyoma.
281 ELEC-2.11.11 Supply of 40A 2 Pole RCCB 100mA, of makes L&T Exora / 1 No
Siemens / GE / ABB / Standard / Havells / HPL / Indo Asian /
Toyoma.
282 ELEC-2.11.12 Supply of 63A 2 Pole RCCB 100mA, of makes L&T Exora / 1 No
Siemens / GE / ABB / Standard / Havells / HPL / Indo Asian /
Toyoma.
283 ELEC-2.11.13 Supply of 40A 4 Pole RCCB 30mA, of makes L&T Exora / 1 No
Siemens / GE / ABB / Standard / Havells / HPL / Indo Asian /
Toyoma.
284 ELEC-2.11.14 Supply of 40A 4 Pole RCCB 30mA, of makes L&T Exora / 1 No
Siemens / GE / ABB / Standard / Havells / HPL / Indo Asian /
Toyoma.
285 ELEC-2.11.15 Supply of 40A 4 Pole RCCB 100mA, of makes L&T Exora / 1 No
Siemens / GE / ABB / Standard / Havells / HPL / Indo Asian /
Toyoma.
286 ELEC-2.11.16 Supply of 63A 4 Pole RCCB 100mA, of makes L&T Exora / 1 No
Siemens / GE / ABB / Standard / Havells / HPL / Indo Asian /
Toyoma.
287 ELEC-2.11.17 Supply of MCB type Change Over Switch 20A Double Pole 2 1 No
way 400V AC suitable to fix on Din Channel of makes
Legrand / Schneider.
SECTION - 3
3.1 STREET LIGHT LUMINAIRES
331 ELEC-3.1.1 Supply of 1 x 36/40 W fluorescent street light luminaire with 1 No
sheet alluminium housing and UV stabilised acrylic cover
with all standard accessories etc of makes Wipro / G.E. /
Phillips / Bajaj / Crompton.
341 ELEC-3.1.12 Supply of 500W Hallozen Flood light luminaire with cast 1 No
alluminium housing and tough end glass cover with all
standard accessories of makes Elton / RK / Style Lamp /
Mahita Electro / Capart / Akhil.
342 ELEC-3.1.13 Supply of 1000W Hallozen Flood light luminaire with cast 1 No
alluminium housing and tough end glass cover with all
standard accessories of makes Elton / RK / Style Lamp /
Mahita Electro / Capart / Akhil.
343 ELEC-3.1.14 Supply of 1 x 26W CFL well glass, low bay luminaire with die 1 No
cast alluminium housing epoxy gray powder coated built in
Electronic ballast with gink plated wire guard and eye bolt of
make Wipro / GE / Phillips / Crompton / Bajaj.
345 ELEC-3.2.2 Supply of 70W SV / MH integral HID lamp post top lantern 1 No
BJDPTI 70SV/ MH LPF or its equivalent with diamond /
Mushroom /Spherical diffuser etc complete with all
accessories of makes Wipro / Phillips / Bajaj / Crompton /
Surya / HPL.
3.4 LAMPS
368 ELEC-3.4.1 Supply of 500W Hallozen Lamp with ISI mark of makes 1 No
Wipro / G.E. / Phillips / Osram/Crompton / Bajaj / Surya /
HPL / Havells.
369 ELEC-3.4.2 Supply of 500W Hallozen Lamp with ISI mark of makes Elton 1 No
/ Style Lamp / Mahita Electro / Capart
370 ELEC-3.4.3 Supply of 1000W Hallozen Lamp with ISI mark of makes 1 No
Wipro / G.E. / Phillips / Osram/Crompton / Bajaj / Surya /
HPL / Havells.
371 ELEC-3.4.4 Supply of 1000W Hallozen Lamp with ISI mark of makes 1 No
Elton / Style Lamp / Mahita Electro / Capart
372 ELEC-3.4.5 Supply of 70W SV Lamp with ISI mark of makes Wipro / 1 No
G.E. / Phillips / Osram/Crompton / Bajaj / Surya / HPL /
Havells.
373 ELEC-3.4.6 Supply of 70W SV Lamp with ISI mark of makes Elton / Style 1 No
Lamp / Mahita Electro / Capart
374 ELEC-3.4.7 Supply of 150W SV Lamp with ISI mark of makes Wipro / 1 No
G.E. / Phillips / Osram/Crompton / Bajaj / Surya / HPL /
Havells.
375 ELEC-3.4.8 Supply of 150W SV Lamp with ISI mark of makes Elton / 1 No
Style Lamp / Mahita Electro / Capart
376 ELEC-3.4.9 Supply of 250W SV Lamp with ISI mark of makesWipro / G.E. 1 No
/ Phillips / Osram/Crompton / Bajaj / Surya / HPL / Havells.
377 ELEC-3.4.10 Supply of 250W SV Lamp with ISI mark of makes Elton / Style 1 No
Lamp / Mahita Electro / Capart
378 ELEC-3.4.11 Supply of 400W SV Lamp with ISI mark of makesWipro / G.E. 1 No
/ Phillips / Osram/Crompton / Bajaj / Surya / HPL / Havells.
379 ELEC-3.4.12 Supply of 400W SV Lamp with ISI mark of makes Elton / 1 No
Style Lamp / Mahita Electro / Capart
380 ELEC-3.4.13 Supply of 70W double end MH Lamp with ISI mark of makes 1 No
Wipro / G.E. / Phillips / Osram/Crompton / Bajaj / Surya /
HPL / Havells.
381 ELEC-3.4.14 Supply of 70W double end MH Lamp with ISI mark of makes 1 No
Elton / Style Lamp / Mahita Electro / Capart
382 ELEC-3.4.15 Supply of 150W double end MH Lamp with ISI mark of 1 No
makes Wipro / G.E. / Phillips / Osram/Crompton / Bajaj /
Surya / HPL / Havells.
383 ELEC-3.4.16 Supply of 150W double end MH Lamp with ISI mark of 1 No
makes Elton / Style Lamp / Mahita Electro / Capart
384 ELEC-3.4.17 Supply of 70W MH Lamp with ISI mark of makes Crompton 1 No
/ Bajaj / Surya / HPL / Havells.
385 ELEC-3.4.18 Supply of 70W MH Lamp with ISI mark of makes Elton / 1 No
Style Lamp / Mahita Electro / Capart
386 ELEC-3.4.19 Supply of 150W MH Lamp with ISI mark of makes Wipro / 1 No
G.E. / Phillips / Osram/Crompton / Bajaj / Surya / HPL /
Havells.
387 ELEC-3.4.20 Supply of 150W MH Lamp with ISI mark of makes Elton / 1 No
Style Lamp / Mahita Electro / Capart
388 ELEC-3.4.21 Supply of 250W MH Lamp with ISI mark of makesWipro / G.E. 1 No
/ Phillips / Osram/Crompton / Bajaj / Surya / HPL / Havells.
389 ELEC-3.4.22 Supply of 250W MH Lamp with ISI mark of makes Elton / 1 No
Style Lamp / Mahita Electro / Capart
390 ELEC-3.4.23 Supply of 400W MH Lamp with ISI mark of makes Wipro / 1 No
G.E. / Phillips / Osram/Crompton / Bajaj / Surya / HPL /
Havells.
391 ELEC-3.4.24 Supply of 400W MH Lamp with ISI mark of makes Elton / 1 No
Style Lamp / Mahita Electro / Capart
393 ELEC-3.5.2 Supply of Automatic Street Light Control System with Optical 1 No
Sensor, Low volatage / High voltage trip and reset, operating
voltage 150 - 280V AC, 50 HZ with suitable SMC enclousure
of IP 54 protection, MCBs and contactor suitable to control the
load of 5 KW of single phase load with necessary clamping
arrangements. Makes : Swadeep Nature Switch / Light Mate.
394 ELEC-3.5.3 Supply of Automatic Street Light Control System with Optical 1 No
Sensor, Low volatage / High voltage trip and reset, operating
voltage 150 - 280V AC, 50 HZ with suitable SMC enclousure
of IP 54 protection, MCBs and contactor suitable to control the
load of 8 KW of single phase load with necessary clamping
arrangements. Makes : Swadeep Nature Switch / Light Mate.
395 ELEC-3.5.4 Supply of Automatic Street Light Control System with Optical 1 No
Sensor, Low volatage / High voltage trip and reset, operating
voltage 150 - 280V AC, 50 HZ with suitable SMC enclousure
of IP 54 protection, MCBs and contactor suitable to control the
load of 5 KW of Three phase load with necessary clamping
arrangements. Makes : Swadeep Nature Switch / Light Mate.
396 ELEC-3.5.5 Supply of Automatic Street Light Control System with Optical 1 No
Sensor, Low volatage / High voltage trip and reset, operating
voltage 150 - 280V AC, 50 HZ with suitable SMC enclousure
of IP 54 protection, MCBs and contactor suitable to control the
load of 8 KW of Three phase load with necessary clamping
arrangements. Makes : Swadeep Nature Switch / Light Mate.
397 ELEC-3.5.6 Supply of Automatic Street Light Control System with Optical 1 No
Sensor, Low volatage / High voltage trip and reset, operating
voltage 150 - 280V AC, 50 HZ with suitable SMC enclousure
of IP 54 protection, MCBs and contactor suitable to control the
load of 12 KW of Three phase load with necessary clamping
arrangements. Makes : Swadeep Nature Switch / Light Mate.
399 ELEC-3.6.2 Supply of 1 x 11W Mirror light with all standard accessories 1 No
diffuser of makes Surya / Havells / HPL / Fortune Art
400 ELEC-3.6.3 Supply of 1 x 36/40W Box type tube light luminaire powder 1 No
coated CRCA sheet steel housing with Electronic Ballast
Chokes and all standard accessoriesof makes Wipro / G.E. /
Phillips / Crompton / Bajaj .
401 ELEC-3.6.4 Supply of 1 x 36/40W Box type tube light luminaire powder 1 No
coated CRCA sheet steel housing with Electronic Ballast
Chokes and all standard accessoriesof makes Surya /
Havells / HPL / Fortune Art
402 ELEC-3.6.5 Supply of 2 x 36/40W Box type tube light luminaire powder 1 No
coated CRCA sheet steel housing with Electronic Ballast
Chokes and all standard accessoriesof makes Wipro / G.E. /
Phillips / Crompton / Bajaj.
403 ELEC-3.6.6 Supply of 2 x 36/40W Box type tube light luminaire powder 1 No
coated CRCA sheet steel housing with Electronic Ballast
Chokes and all standard accessoriesof makes Surya /
Havells / HPL / Fortune Art
406 ELEC-3.6.9 Supply of 2 x 36W CFL Direct / Indirect Recessed low glare 1 No
Mirror Optic luminaire comprising bright anodised alluminium
reflector with Electronic Ballst of makes Wipro / G.E. /
Phillips / Thorn / Crompton / Bajaj.
407 ELEC-3.6.10 Supply of 1 x 18W CFL Direct / Indirect Recessed low glare 1 No
Mirror Optic luminaire comprising bright anodised alluminium
reflector with Electronic Ballst of makes Wipro / G.E. /
Phillips / Thorn / Crompton / Bajaj.
408 ELEC-3.6.11 Supply of 9/13W VPIT Ballast for CFL with ISI mark. Makes : 1 No
Phillips / Crompton / Bajaj / Surya / HPL / Havells
409 ELEC-3.6.12 Supply of 9/13W VPIT Ballast for CFL with ISI mark. Makes : 1 No
Fortune Art / Style Lamp / Mahita Electro / Capart
410 ELEC-3.6.13 Supply of 18W VPIT Ballast for CFL with ISI 1 No
mark.
Makes : Phillips / Crompton / Bajaj / Surya /
HPL / Havells
411 ELEC-3.6.14 Supply of 18W VPIT Ballast for CFL with ISI 1 No
mark.
Makes : Fortune Art / Style Lamp / Mahita
Electro / Capart
412 ELEC-3.6.15 Supply of 20W / 40W Copper Wound 1 No
Ballast.
Makes : Phillips / Crompton / Bajaj / Surya /
HPL / Havells
413 ELEC-3.6.16 Supply of 20W / 40W Copper Wound 1 No
Ballast.
Makes : Fortune Art / Style Lamp / Mahita
Electro / Capart
414 ELEC-3.6.17 Supply of 18/20W VPIT Ballast. 1 No
Makes : Phillips / Crompton / Bajaj / Surya /
HPL / Havells
415 ELEC-3.6.18 Supply of 18/20W VPIT Ballast. 1 No
Makes : Fortune Art / Style Lamp / Mahita
Electro / Capart
416 ELEC-3.6.19 Supply of 36/40W VPIT Ballast of makes 1 No
Phillips / Crompton / Bajaj / Surya.
Makes : Phillips / Crompton / Bajaj / Surya /
HPL / Havells
417 ELEC-3.6.20 Supply of 36/40W VPIT Ballast of makes 1 No
Phillips / Crompton / Bajaj / Surya.
Makes : Fortune Art / Style Lamp / Mahita
Electro / Capart
418 ELEC-3.6.21 Supply of 40W Starter of makes Phillips / 1 No
Crompton / Bajaj / Surya.
Makes : Phillips / Crompton / Bajaj / Surya / HPL / Havells
419 ELEC-3.6.22 Supply of 40W Starter of makes Phillips / 1 No
Crompton / Bajaj / Surya.
Makes : Phillips / Crompton / Bajaj / Surya / HPL / Havells
420 ELEC-3.6.23 Supply of Rotor holder(FTL). 1 No
Makes : Phillips / Crompton / Bajaj / Surya / HPL / Havells.
428 ELEC-3.6.31 Supply of 36W Electronic Ballast with total hormonic distortion 1 No
is less than 10% for FTL.
Makes : Phillips / Crompton / Bajaj / Surya / HPL / Havells
429 ELEC-3.6.32 Supply of 36W Electronic ballast with power factor greater 1 No
than 0.9 to 0.95 suitable for FTL. Make : Crompton Model
No.EBN 136D / Bajaj Model No.BJHF 136 / Havells LHBF
27904025 or its equivalent.
ELEC-3.11.2a 20W 1 No
ELEC-3.11.2b 30W 1 No
ELEC-3.11.2c 43/45W 1 No
ELEC-3.11.2d 60/65W 1 No
ELEC-3.11.2e 72W 1 No
ELEC-3.11.2f 90W 1 No
ELEC-3.11.2g 120W 1 No
ELEC-3.11.2h 150W 1 No
ELEC-3.11.2i 180W 1 No
ELEC-3.11.2j 210W 1 No
ELEC-3.11.3 Supply and transportation of ......... .LED
Street light Luminaire made of pressure die
cast aluminum body with powder coated,
having protective toughened glass (Silicon
gasket ensures Optical & Electrical
compartments are IP 66 )protected, Supply
Input voltage 120 - 270 V AC, P.F ≥ 0.90,
high power LED's having efficacy ≥100
lumens/watt, System efficacy ≥85lm/W and
junction temperature < 70°C, with Ingress
protection IP65, Driver surge protection
4KV, external Surge protection ≥ 5KV with
optics distribution Type II medium,
THD<10% at 110 Volts AC, driver efficiency
≥90%, w, CCT: 3000K - 5700K, minimum
CRI≥70, etc., complete.
LUMINAIRE MAKE : STANJO / COSMO /
TRINIC / VRILISO / KASHYAP BLU / PROLITE
/ SCINTILLA.
LED MAKE : PHILIPS LUMILEDS / CREE /
NICHIA / OSRAM / SAMSUNG / LG LEDs.
ELEC-3.11.3a 20W 1 No
ELEC-3.11.3b 30W 1 No
ELEC-3.11.3c 43/45W 1 No
ELEC-3.11.3d 60/65W 1 No
ELEC-3.11.3e 90W 1 No
ELEC-3.11.3f 120W 1 No
ELEC-3.11.3g 150W 1 No
ELEC-3.11.3h 180W 1 No
ELEC-3.11.3i 210W 1 No
ELEC-3.11.4a 60W 1 No
ELEC-3.11.4b 90W 1 No
ELEC-3.11.4c 120W 1 No
ELEC-3.11.5a 60W 1 No
ELEC-3.11.5b 90W 1 No
ELEC-3.11.5c 120W 1 No
ELEC-3.13.1a 80W 1 No
ELEC-3.13.1b 120W 1 No
ELEC-3.13.2a 150W 1 No
ELEC-3.13.2b 200W 1 No
SECTION - 4
4.1 U.G. CABLES
1 ELEC-4.1.1 Supply of 4 Sqmm 2 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) of Makes : Torrent / Universal / Unicab /
Polycab / Havells / Gloster / KEI.
14 ELEC-4.1.14 Supply of 25 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) ofMakes : RPG / Finolex / Paragon / V-
Guard
/ Fortune Art / Suncab / Finecab / Gemscab
/ Payal.
15 ELEC-4.1.15 Supply of 35 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming
to IS:7098 (Part - I) of Makes : Torrent / Universal / Unicab /
Polycab / Havells / Gloster / KEI.
16 ELEC-4.1.16 Supply of 35 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) of Makes : RPG / Finolex / Paragon / V-
Guard
/ Fortune Art / Suncab / Finecab / Gemscab
/ Payal.
19 ELEC-4.1.19 Supply of 70 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) of Makes : Torrent / Universal / Unicab /
Polycab / Havells / Gloster / KEI.
20 ELEC-4.1.20 Supply of 70 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming
to IS:7098 (Part - I) of Makes : RPG / Finolex / V-Guard /
Gloster /
Suncab / Finecab / Gemscab
21 ELEC-4.1.21 Supply of 95 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) ofMakes : Torrent / Universal / Unicab /
Polycab / Havells / Gloster / KEI.
22 ELEC-4.1.22 Supply of 95 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming
to IS:7098 (Part - I) ofMakes : RPG / Finolex / V-Guard /
Gloster /
Suncab / Finecab / Gemscab
23 ELEC-4.23 Supply of 120 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) ofMakes : Torrent / Universal / Unicab /
Polycab / Havells / Gloster / KEI.
24 ELEC-4.1.24 Supply of 120 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) ofMakes : RPG / Finolex / V-Guard /
Gloster /
Suncab / Finecab / Gemscab
25 ELEC-4.1.25 Supply of 150 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) of Makes : Torrent / Universal / Unicab /
Polycab / Havells / Gloster / KEI.
26 ELEC-4.1.26 Supply of 150 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) ofMakes : RPG / Finolex / V-Guard /
Gloster /
Suncab / Finecab / Gemscab
27 ELEC-4.1.27 Supply of 185 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming
to IS:7098 (Part - I) ofMakes : Torrent / Universal / Unicab /
Polycab / Havells / Gloster / KEI.
28 ELEC-4.1.28 Supply of 185 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) of Makes : RPG / V-Guard.
29 ELEC-4.1.29 Supply of 240 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) ofMakes : Torrent / Universal / Unicab /
Polycab / Havells / Gloster / KEI.
30 ELEC-4.1.30 Supply of 240 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) of Makes : RPG / V-Guard.
31 ELEC-4.1.31 Supply of 300 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) of Makes : Torrent / Universal / Unicab /
Polycab / Havells / Gloster / KEI.
32 ELEC-4.1.32 Supply of 300 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) of Makes : RPG / V-Guard.
33 ELEC-4.1.33 Supply of 400 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) ofMakes : Torrent / Universal / Unicab /
Polycab / Havells / Gloster / KEI.
34 ELEC-4.1.34 Supply of 400 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) of Makes : RPG / V-Guard.
35 4.2 11 KV H.T. XLPE CABLES
36 ELEC-4.2.1 Supply of 3 Core 11 KV 35 Sqmm HT XLPE (E) armoured 1 RM
Cable, as per IS specification confirming to IS 7098/II/85 with
latest ammendments. Makes Torrent / Universal / CCI
/ Polycab / KEI / Unicab.
51 4.4 LUGS
52 ELEC-4.4.1 Supply and fixing of crimping type copper lugs confirming to 1 No
I.S specifications for cable upto 16 Sq.mm including nuts and
bolts with connections.
96 ELEC-4.8.2 Supply and Transportation of Outer dia 63mm and Inner dia 1 Mtr
51mm double walled corrugated HDPE duct made as per
specification BSEN - 500 86/IS 14930 Part-II. Makes:DURA
LINE (Dura Guard) or its equivalent make.
97 ELEC-4.8.3 Supply and Transportation of Outer dia 78mm and Inner dia 1 Mtr
63mm double walled corrugated HDPE duct made as per
specification BSEN - 500 86/IS 14930 Part-II. Makes:DURA
LINE (Dura Guard) or its equivalent make.
98 ELEC-4.8.4 Supply and Transportation of Outer dia 90mm and Inner dia 1 Mtr
76mm double walled corrugated HDPE duct made as per
specification BSEN - 500 86/IS 14930 Part-II. Makes:DURA
LINE (Dura Guard) or its equivalent make.
99 ELEC-4.8.5 Supply and Transportation of Outer dia 120mm and Inner dia 1 Mtr
103.50mm double walled corrugated HDPE duct made as per
specification BSEN - 500 86/IS 14930 Part-II. Makes:DURA
LINE (Dura Guard) or its equivalent make.
100 ELEC-4.8.6 Supply and Transportation of Outer dia 160mm and Inner dia 1 Mtr
136mm double walled corrugated HDPE duct made as per
specification BSEN - 500 86/IS 14930 Part-II. Makes:DURA
LINE (Dura Guard) or its equivalent make.
101 ELEC-4.8.7 Supply and Transportation of Outer dia 180mm and Inner dia 1 Mtr
152mm double walled corrugated HDPE duct made as per
specification BSEN - 500 86/IS 14930 Part-II. Makes:DURA
LINE (Dura Guard) or its equivalent make.
102 ELEC-4.8.8 Supply and Transportation of Outer dia 200mm and Inner dia 1 Mtr
170mm double walled corrugated HDPE duct made as per
specification BSEN - 500 86/IS 14930 Part-II. Makes:DURA
LINE (Dura Guard) or its equivalent make.
105 ELEC-4.9.2 Supply and Installation of 600mm x 50mm x 2mm thick GI 1 Mtr
perforated cable tray with cover along with required angle
supports, with coupler plates, Anchor bolts and nuts etc
complete and the tray should be fitted on the wall / Ceiling
etc. complete.
106 ELEC-4.9.3 Supply and Installation of 450mm x 50mm x 2mm thick GI 1 Mtr
perforated cable tray with cover along with required angle
supports, with coupler plates, Anchor bolts and nuts etc
complete and the tray should be fitted on the wall / Ceiling
etc. complete.
107 ELEC-4.9.4 Supply and Installation of 300mm x 50mm x 2mm thick GI 1 Mtr
perforated cable tray with cover along with required angle
supports, with coupler plates, Anchor bolts and nuts etc
complete and the tray should be fitted on the wall / Ceiling
etc. complete.
108 ELEC-4.9.5 Supply and Installation of 150mm x 50mm x 2mm thick 1 Mtr
GI perforated cable tray with cover along with required
angle supports, with coupler plates, Anchor bolts and
nuts etc complete and the tray should be fitted on the
wall / Ceiling etc. complete.
109 ELEC-4.9.6 Supply and Installation of 150mm x 50mm x 2mm 1 Mtr
thick GI Ladder type cable tray along with required
angle supports, with coupler plates, Anchor bolts and
nuts etc complete and the tray should be fitted on the
wall / Ceiling etc. complete.
110 ELEC-4.9.7 Supply and Installation of 300mm x 50mm x 2mm thick 1 Mtr
GI Ladder type cable tray along with required angle
supports, with coupler plates, Anchor bolts and nuts etc
complete and the tray should be fitted on the wall / Ceiling
etc. complete.
111 ELEC-4.9.8 Supply and Installation of 600mm x 75mm x 2mm 1 Mtr
thick GI Ladder type cable tray along with required
angle supports, with coupler plates, Anchor bolts and
nuts etc complete and the tray should be fitted on the
wall / Ceiling etc. complete.
112 Note: Perforated cable trays provided without cover 30%
may be deducted from above rates.
113 SECTION - 5
114 5.1 FANS
115 ELEC-5.1.1 Supply of 48" (1200mm) Sweep ISI mark Ceiling Fan as per 1 No
IS 374 - 1979 and, with double ball bearings but without
Regulator of makes Crompton / Bajaj Kassels 50 / Usha
atom
116 ELEC-5.1.2 Supply of 48" (1200mm) Sweep 5 Star rated Ceiling Fan 1 No
without Regulator of makes Crompton High Speed Decora /
Bajaj Regal star / Havells Fusion 50 / Orient Summer Crown /
Usha technix decorative
117 ELEC-5.1.3 Supply of 56" (1400mm) Sweep ISI mark Ceiling Fan as per 1 No
IS 374 - 1979 and, with double ball bearings but without
Regulator of makes Crompton / Bajaj Kassels 50 / Usha atom
118 ELEC-5.1.4 Supply of 56" (1400mm) Sweep 4/5 Star rated Ceiling Fan 1 No
without Regulator of makes Crompton / Bajaj Elegance Star /
Usha / Havells.
124 ELEC-5.1.10 Supply of 12" (300mm) Light duty exhaust fan with wire guard 1 No
etc complete of makes Crompton / Bajaj Bahar WG / Havells
Ventil Air-DB / Orient hill air.
125 ELEC-5.1.11 Supply of 9" (225mm), Light duty exhaust fan with double ball 1 No
bearing and wire guard etc complete of makes Crompton /
Bajaj Bahar WG / Havells Ventil Air-DS / Orient hill air.
126 ELEC-5.1.12 Supply of 12" (300mm) ISI, 900 RPM Heavy duty exhaust fan 1 No
with metallic blades with Mark of makes Crompton /
Almounard / Havells Turbo Force.
127 ELEC-5.1.13 Supply of 15" (375mm) ISI, 900 RPM Heavy duty exhaust fan 1 No
with metallic blades with Mark of makes Crompton /
Almounard / Havells Turbo Force
128 ELEC-5.1.14 Supply of 18" (450mm) ISI, 900 RPM Heavy duty exhaust fan 1 No
with metallic blades with Mark of makes Crompton /
Almounard / Havells Turbo Force
139 ELEC-5.4.2 Supply & Fixing of D.O.L Starter 415V, 3 phase, 50Hz.. 1 No
enclosed with no volt coil and overload protection with
necessary materials, etc., complete suitableupto
7.5.HP.Makes:Siemens / Crompton / L&T.
140 ELEC-5.4.3 Supply & Fixing of D.O.L Starter 415V, 3 phase, 50Hz.. 1 No
enclosed with no volt coil, overload protection and single
phase preventor , etc., complete suitable upto 10.0.HP.
Makes:Siemens / Crompton / L&T.
154 ELEC-5.6.2 Supply and Transportation of 3.00HP Star rated 5-10 Stage 1 No
Three phase ISI submersible motor pumpset suitable for 6"
Bore well.Makes: Varuna / Flowell / Waterman / Techno /
Mahavir / Unitech / Fitwell / Lubi / Falcon / Sterling
155 ELEC-5.6.3 Supply and Transportation of 5.00HP Star rated 5-10 Stage 1 No
Three phase ISI submersible motor pumpset suitable for 6"
Bore well. Makes: Kirloskar / Crompton / Texmo / CRI
/ KSB / Aryan Varsha
156 ELEC-5.6.4 Supply and Transportation of 5.00HP Star rated 5-10 Stage 1 No
Three phase ISI submersible motor pumpset suitable for 6"
Bore well.Makes: Varuna / Flowell / Waterman / Techno /
Mahavir / Unitech / Fitwell / Lubi / Falcon / Sterling
157 ELEC-5.6.5 Supply and Transportation of 5.00HP Star rated 12-16 Stage 1 No
Three phase ISI submersible motor pumpset suitable for 6"
Bore well. Makes: Kirloskar / Crompton / Texmo / CRI
/ KSB / Aryan Varsha
158 ELEC-5.6.6 Supply and Transportation of 5.00HP Star rated 12-16 Stage 1 No
Three phase ISI submersible motor pumpset suitable for 6"
Bore well.Makes: Varuna / Flowell / Waterman / Techno /
Mahavir / Unitech / Fitwell / Lubi / Falcon / Sterling
159 ELEC-5.6.7 Supply and Transportation of 7.5.00HP Star rated 5-10 Stage 1 No
Three phase ISI submersible motor pumpset suitable for 6"
Bore well. Makes: Kirloskar / Crompton / Texmo / CRI
/ KSB / Aryan Varsha
160 ELEC-5.6.8 Supply and Transportation of 7.5.00HP Star rated 5-10 Stage 1 No
Three phase ISI submersible motor pumpset suitable for 6"
Bore well.Makes: Varuna / Flowell / Waterman / Techno /
Mahavir / Unitech / Fitwell / Lubi / Falcon / Sterling
165 ELEC-5.6.13 Supply and Transportation of 10.00HP Star rated 5-10 Stage 1 No
Three phase ISI submersible motor pumpset suitable for 6"
Bore well. Makes: Kirloskar / Crompton / Texmo / CRI
/ KSB / Aryan Varsha
166 ELEC-5.6.14 Supply and Transportation of 10.00HP Star rated 5-10 Stage 1 No
Three phase ISI submersible motor pumpset suitable for 6"
Bore well.Makes: Varuna / Flowell / Waterman / Techno /
Mahavir / Unitech / Fitwell / Lubi / Falcon / Sterling
167 ELEC-5.6.15 Supply and Transportation of10.00HP Star rated 12-16 Stage 1 No
Three phase ISI submersible motor pumpset suitable for 6"
Bore well. Makes: Kirloskar / Crompton / Texmo / CRI
/ KSB / Aryan Varsha
168 ELEC-5.6.16 Supply and Transportation of 10.00HP Star rated 12-16 Stage
Three phase ISI submersible motor pumpset suitable for 6"
Bore well.Makes: Varuna / Flowell / Waterman / Techno /
Mahavir / Unitech / Fitwell / Lubi / Falcon / Sterling
169 ELEC-5.6.17 Supply and Transportation of 10.00HP Star rated 20-24 Stage
Three phase ISI submersible motor pumpset suitable for 6"
Bore well.Makes: Varuna / Flowell / Waterman / Techno /
Mahavir / Unitech / Fitwell / Lubi / Falcon / Sterling
170 ELEC-5.6.18 Supply and Transportation of 10.00HP Star rated 20-24 Stage
Three phase ISI submersible motor pumpset suitable for 6"
Bore well. Makes: Kirloskar / Crompton / Texmo / CRI
/ KSB / Aryan Varsha
171 ELEC-5.6.19 Supply and Transportation of 12.50HP Star rated 8-12 Stage
Three phase ISI submersible motor pumpset suitable for 6"
Bore well. Makes: Kirloskar / Crompton / Texmo / CRI
/ KSB / Aryan Varsha
174 ELEC-5.6.22 Supply and Transportation of 12.50HP Star rated 12-16 Stage
Three phase ISI submersible motor pumpset suitable for 6"
Bore well.Makes: Varuna / Flowell / Waterman / Techno /
Mahavir / Unitech / Fitwell / Lubi / Falcon / Sterling
175 ELEC-5.6.23 Supply and Transportation of 15.00HP Star rated 8-12 Stage
Three phase ISI submersible motor pumpset suitable for 6"
Bore well. Makes: Kirloskar / Crompton / Texmo / CRI
/ KSB / Aryan Varsha
176 ELEC-5.6.24 Supply and Transportation of 15.00HP Star rated 8-12 Stage
Three phase ISI submersible motor pumpset suitable for 6"
Bore well.Makes: Varuna / Flowell / Waterman / Techno /
Mahavir / Unitech / Fitwell / Lubi / Falcon / Sterling
181 ELEC-5.7.2 Supply and Transportation of 1.00HP Single phase open well 1 No
ISI submersible motor pumpset. Makes: Kirloskar /
Crompton / CRI / L&T / Texmo / Varsha.
182 ELEC-5.7.3 Supply and Transportation of 1.50HP Single phase open well 1 No
ISI submersible motor pumpset. Makes: Kirloskar /
Crompton / CRI / L&T / Texmo / Varsha.
183 ELEC-5.7.4 Supply and Transportation of 1.50HP Single phase open well 1 No
ISI submersible motor pumpset. Makes: Kirloskar /
Crompton / CRI / L&T / Texmo / Varsha.
184 ELEC-5.7.5 Supply and Transportation of 3.00HP Single phase open well 1 No
ISI submersible motor pumpset. Makes: Kirloskar /
Crompton / CRI / L&T / Texmo / Varsha.
185 ELEC-5.7.6 Supply and Transportation of 3.00HP Single phase open well 1 No
ISI submersible motor pumpset. Makes: Kirloskar /
Crompton / CRI / L&T / Texmo / Varsha.
187 ELEC-5.8.1 Supply and Transportation of 3.00HP Three phase open well 1 No
ISI submersible motor pumpset.(65x50) Makes:
Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.
188 ELEC-5.8.2 Supply and Transportation of 3.00HP Three phase open well
ISI submersible motor pumpset.(65x50) Makes:
Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.
189 ELEC-5.8.3 Supply and Transportation of 5.00HP Three phase open well 1 No
ISI submersible motor pumpset.(75x65) Makes:
Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.
190 ELEC-5.8.4 Supply and Transportation of 5.00HP Three phase open well
ISI submersible motor pumpset.(75x65) Makes:
Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.
191 ELEC-5.8.5 Supply and Transportation of 7.50HP Three phase open well 1 No
ISI submersible motor pumpset.(100x75) Makes:
Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.
192 ELEC-5.8.6 Supply and Transportation of 7.50HP Three phase open well
ISI submersible motor pumpset.(100x75) Makes:
Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.
197 ELEC-5.9.2 Supply and Transportation of 0.5HP Single phase ISI Mono
block motor pumpset (25x25mm). Makes: Kirloskar /
Crompton / CRI / L&T / Texmo / Varsha.
198 ELEC-5.9.1 Supply and Transportation of 1.0HP Single phase ISI Mono 1 No
block motor pumpset (25x25mm). Makes: Kirloskar /
Crompton / CRI / L&T / Texmo / Varsha.
199 ELEC-5.9.1 Supply and Transportation of 1.0HP Single phase ISI Mono 1 No
block motor pumpset (25x25mm). Makes: Kirloskar /
Crompton / CRI / L&T / Texmo / Varsha.
200 ELEC-5.9.1 Supply and Transportation of 1.5HP Single phase ISI Mono 1 No
block motor pumpset (32x25mm). Makes: Kirloskar /
Crompton / CRI / L&T / Texmo / Varsha.
201 ELEC-5.9.1 Supply and Transportation of 1.5HP Single phase ISI Mono 1 No
block motor pumpset (32x25mm). Makes: Aryan varsha /
Flowell/ Waterman
202 ELEC-5.9.1 Supply and Transportation of 1.02HP Single phase ISI self 1 No
priming Mono block IP44 motor pumpset (40x40mm).
Makes: Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.
203 ELEC-5.9.1 Supply and Transportation of 1.02HP Single phase ISI self 1 No
priming Mono block IP44 motor pumpset (40x40mm).
Makes: Aryan varsha / Flowell/ Waterman
204 ELEC-5.9.1 Supply and Transportation of 2.00HP Three phase ISI self 1 No
priming Mono block IP44 motor pumpset (40x40mm).
Makes: Kirloskar / Crompton / CRI / Texmo / CRL / KSB
205 ELEC-5.9.1 Supply and Transportation of 2.00HP Three phase ISI self 1 No
priming Mono block IP44 motor pumpset (40x40mm).
Makes: Aryan varsha / Flowell/ Waterman
206 ELEC-5.9.1 Supply and Transportation of 3.00HP Three phase ISI self 1 No
priming Mono block IP44 motor pumpset (50x50mm). Makes:
Kirloskar / Crompton / CRI / Texmo / CRL / KSB
207 ELEC-5.9.1 Supply and Transportation of 3.00HP Three phase ISI self 1 No
priming Mono block IP44 motor pumpset (50x50mm). Makes:
Aryan varsha / Flowell/ Waterman
208 ELEC-5.9.1 Supply and Transportation of 5.00HP Three phase ISI self
priming Mono block IP44 motor pumpset (80x80mm).
Makes: Kirloskar / Crompton / CRI / Texmo / CRL / KSB
209 ELEC-5.9.1 Supply and Transportation of 5.00HP Three phase ISI self 1 No
priming Mono block IP44 motor pumpset (80x80mm).
Makes:Aryan varsha / Flowell/ Waterman
ELEC-5.12.2a OD 42mm
ELEC-5.12.2b OD 48mm
ELEC-5.12.2c OD 60mm
ELEC-5.12.2d OD 75mm
ELEC-5.12.2e OD 80mm
ELEC-5.12.3 Supply, Transportation and fixing of
following galvanised GI bends heavy duty
with threaded at both ends for installing the
pump set including cost and conveyance of
all materials, taxes etc., complete
ELEC-5.12.3a 50mm dia 90 degree bend with length of
20cm (Center to face)
ELEC-5.12.3b 65mm dia 90 degree bend with length of
20cm (Center to face)
ELEC-5.12.3c 80mm dia 90 degree bend with length of
20cm (Center to face)
ELEC-5.12.4 Supply, Transportation and fixing of
following MS threaded Flanges 2 Nos with
nuts and bolts including cost and
conveyance of all materials, taxes etc.,
complete
ELEC-5.12.4a 50mm dia MS flanges set (2 Nos) 150mm
dia OD, 12mm thick each flange with
required dia bolts and nuts
ELEC-5.12.4b 65mm dia MS flanges set (2 Nos) 165mm
dia OD, 12mm thick each flange with
required dia bolts and nuts
ELEC-5.12.4c 80mm dia MS flanges set (2 Nos) 175mm
dia OD, 12mm thick each flange with
required dia bolts and nuts
ELEC-5.12.5 Supply, Transportation and fixing of MS
Clamp set with nuts and bolts.
ELEC-5.12.5a 50mm dia, 450mm length, 12mm thickness
and 75mm wide with required nuts and
bolts.
ELEC-5.12.5b 65mm dia, 450mm length, 12mm thickness
and 75mm wide with required nuts and
bolts.
ELEC-5.12.5c 80mm dia, 450mm length, 12mm thickness
and 75mm wide with required nuts and
bolts
ELEC-5.12.5d 150mm dia galvanised bore cover with bolts
and nuts.
ELEC-5.12.5e 150mm dia stainless steel bore cover with
bolts and nuts
266 ELEC-6.3.1.a. Single Phase R-22 Makes: 2.2TR Daikin / 2.0TR 'O' Genral 1 No
AUG25AB
267 ELEC-6.3.1.b 3.0TR Three Phase capable of delivering 36000 BTU/hr 1 No
and above with operating on refrigerant R-22 makes
Makes: 'O' Genral
268 ELEC-6.3.1.c 3.5TR Three Phase capable of delivering 42000 BTU/hr 1 No
and above with operating on refrigerant R-22 Makes: 'O'
General
269 ELEC-6.3.1.d 3.3TR Three Phase capable of delivering 42000 BTU/hr 1 No
and above with operating on refrigerant R-22 Makes: Daikin
271 ELEC-6.3.1.f 4.1TR Three Phase capable of delivering 48000 BTU/hr and 1 No
above with operating on refrigerant R-22 Makes: Daikin / 'O'
Genral
272 ELEC-6.3.1.g 4.0TR Three Phase capable of delivering 48000 BTU/hr and 1 No
above with operating on refrigerant R-22 Makes: Carrier /
Blue Star
273 ELEC-6.3.1.h 3.0TR Three Phase capable of delivering 36000 BTU/hr and 1 No
above with operating on refrigerant R-410 Makes:Carrier /
Blue Star.
274 ELEC-6.3.1.i 3.0TR Three Phase capable of delivering 36000 BTU/hr and 1 No
above with operating on refrigerant R-410 Makes:Toshibha /
O General (Inverter Technology)
275 ELEC-6.3.1.j 4.0TR Three Phase capable of delivering 48000 BTU/hr and 1 No
above with operating on refrigerant R-410 Makes: Carrier /
Blue Star
276 ELEC-6.3.1.k 4.0TR Three Phase capable of delivering 48000 BTU/hr and 1 No
above with operating on refrigerant R-410 Makes:Toshibha /
O General (Inverter Technology)
#REF! 6.4 TOWER MODEL TYPE AC UNITS
#REF! ELEC-6.4.1 Supply of Slim line / Tower Model/Verticool type split AC
unit with indoor unit and floor mounted outdoor
condencing unit Hermetically sealed Scroll compressor
suitable for operation on AC supply capable of performing
cooling dehumidifying air circulating and filtering with
cooling and condensing units etc complete with cordless
remote control
#REF! ELEC-6.4.1.a 3.0TR Three Phase capable of delivering 36000 BTU/hr and 1 No
above with operating on refrigerant R-22 Makes: Voltas
#REF! ELEC-6.4.1.b 3.5TR Three Phase capable of delivering 42000 BTU/hr and 1 No
above with operating on refrigerant R-22 Makes: Blue Star
#REF! ELEC-6.5.1 Supply of INVERTER Model Heat Cool type split AC unit
with high wall mounted Single Split indoor unit and
outdoor condencing unit Hermetically sealed compressor
suitable for operation on 230V, 50Hz, 1Phase AC supply
capable of performing Heat cool dehumidi -fying air circulating
and filtering with cooling and condensing units duly insulated
and 3 core copper flexible chord of required length etc.
complete.
214 ELEC-6.6.2 Providing 2 runs of Copper tubes for suction and discharge 1 Mtr
between indoor and outdoor unit for split Air-Conditioner
including foaming etc., complete.
215 ELEC-6.6.3 Supply of 1.0 / 1.5 Ton brand new Rotary type sealed 1 No
compressor.
216 ELEC-6.6.4 Supply of 2.0 Ton brand new Rotary type sealed 1 No
compressor.
217 ELEC-6.6.5 Multi speed Fan Motor suitable for 1.0 / 1.5 / 2.0 Ton 1 No
Window A.C.Unit of makes Crompton / AU.
218 ELEC-6.6.6 Fan motor capacitor 6 mfd by new capacitor for A.C 1 No
machine of 1.0 1.5 / Ton Capacity.
219 ELEC-6.6.7 Thermostat switch suitable for 1.0 / 1.5 / 2.0 Ton A.C.Unit. 1 No
223 ELEC-6.6.11 Filter and capillary tube including welding etc., complete for 1 No
1.0 / 1.5 / 2.0 Ton A.C.Unit.
224 ELEC-6.6.12 Air filter suitable for 1.50 Ton Window A.C.Unit P.V.C./ 1 No
NYLON.
225 ELEC-6.6.13 Air filter suitable for 1.50 Ton Split A.C.Unit P.V.C. / NYLON. 1 No
226 ELEC-6.6.14 Rewiring the entire Window type 1.50 Ton A.C.unit with 2.5 1 No
Sq.mm Flexible copper cable and putting the same in
working conditions.
227 ELEC-6.6.15 Overhauling and servicing the Window type 1.0 / 1.5 Ton A.C. 1 No
Machine by Cleaning the condensor cooling Coil etc., by
blower and oiling the Fan Motor and Cleaning all parts and
putting the machine in working condition.
229 ELEC-6.6.17 Grill of 1.0 / 1.5 ton A.C. Machine (for assembled Units). 1 No
230 ELEC-6.6.18 Grill of 1.0 / 1.5 ton A.C. Machine of branded units. 1 No
232 ELEC-6.6.20 Flushing the line, leak testing, leak stopping, vaccumming, 1 No
dehydrating and charging the gas in the refrigeration
system for 1.0/ 1.5 /2.0 Ton Window A.C.Unit.
233 ELEC-6.6.21 Flushing the line, leak testing, leak stopping, vaccumming, 1 No
dehydrating and charging the gas in the refrigeration
system for 1.5 /2.0 Ton Split A.C.Unit.
234 ELEC-6.6.22 Spray painting of Refrigerator using good quality paint after 1 No
scraping the surface etc.
235 ELEC-6.6.23 New sealed compressor of 1/8 HP suitable for 165 to 185 1 No
Ltrs. Capacity Refrigerator.
236 ELEC-6.6.24 Sealed compressor of 1/6 HP suitable for 285 / 310 Ltrs. 1 No
Capacity Refrigerator.
237 ELEC-6.6.25 Supply of fan motor by new 1/10 t0 1/12 H.P 1250 RPM fan 1 No
motor for Water Cooler of 80-150 Ltrs.
243 ELEC-6.6.31 Installation of 1.5 / 2.0 / 3.0 TR Tower type Split Air 1 No
Conditioners.
7.3 BRACKETS
#REF! ELEC-7.3.1 Fabrication, Transportation and supply of 1.0 Mtr Length 1 No
Single Arm Bracket made with MS galvanized 40mm / 50mm
dia Pipe.
#REF! ELEC-7.3.2 Fabrication, Transportation and supply of 1.50 Mtr 1 No
Length Single Arm Bracket made with MS galvanized
40mm / 50mm dia Pipe.
#REF! ELEC-7.3.3 Fabrication, Transportation and supply of of 1.5mtrs 1 No
sword type decorative double arm bracket with dooms
either sides complete with all accessories with MS
galvanized 50mm dia Pipe.
#REF! ELEC-7.3.4 Fabrication, Transportation and supply of 1.5mtrs decorative 1 No
galvanized Single arm bracket with PU paint complete with all
accessories with MS galvanized 50mm dia Pipe
7.10 G R P POLES
ELEC-7.10.1 Supply and transportation of following glass reinforced
polymer (GRP) composite type Conical pole with single arm
bracket of length 1Mtr and internal junction box including
labour charges etc., complete.
Makes: Bajaj / Kemrock / Sumip.
ELEC-7.10.1a 3.00 Mtrs height, Bottom dia 143mm, Top 76mm, AV 1 No
thickness 6mm and to withstand maximum wind velocity
155Km/Hr
ELEC-7.10.1b 4.00 Mtrs height, Bottom dia 143mm, Top 76mm, 1 No
AV thickness 6mm and to withstand maximum wind
velocity 155Km/Hr
#REF! ELEC-7.10.1c 6.00 Mtrs height, Bottom dia 143mm, Top 76mm, 1 No
AV thickness 6mm and to withstand maximum wind
velocity 155Km/Hr
#REF! ELEC-7.10.1d 8.00 Mtrs height, Bottom dia 193mm, Top 76mm, 1 No
AV thickness 6mm and to withstand maximum wind
velocity 155Km/Hr
#REF! ELEC-7.10.1e 10.00 Mtrs height, Bottom dia 227mm, Top 76mm, AV 1 No
thickness 6mm and to withstand maximum wind velocity
155Km/Hr
#REF! ELEC-7.10.2 Supply and transportation of base bracket suitable for
glass reinforced polymer (GRP) composite type pole including
labour charges etc., complete. Makes: Bajaj / Kemrock /
Sumip.
#REF! ELEC-7.10.2a For 3.00 Mtrs Pole 1 No
#REF! ELEC-7.10.2b For 4.00 Mtrs Pole 1 No
#REF! ELEC-7.10.2c For 6.00 Mtrs Pole 1 No
#REF! ELEC-7.10.2d For 8.00 Mtrs Pole 1 No
#REF! ELEC-7.10.2e For 10.00 Mtrs Pole 1 No
#REF! 7.11 CONTROL PANEL BOARD
#REF! ELEC-7.11.1 Fabrication and erection of 14SWG CRCA sheet steel 1 sq.
enclosure for power control cubicle panel / boxes etc., Mtr
including cutting, bending drilling, welding and reveting
etc., complete with cleaning with 7 tank process and painting
with powder coating including cost and conveyance of all
materials and labour charges.
#REF! ELEC-6.2.2 Fabrication and erection of 16 SWG CRCA sheet steel 1 sq.
enclosure for power control cubicle panel / boxes etc., Mtr
including cutting, bending drilling, welding and reveting
etc., complete with cleaning with 7 tank process and painting
with powder coating including cost and conveyance of all
materials and labour charges.
#REF! ELEC-6.2.3 Fabrication and erection of 18SWG CRCA sheet steel 1 sq.
enclosure for power control cubicle panel / boxes etc., Mtr
including cutting, bending drilling, welding and reveting etc.,
complete with cleaning with 7 tank process and painting with
powder coating including cost and conveyance of all
materials and labour charges.
#REF! ELEC-7.12.3 Supply and erection of 0-100 /200 /400 /600 /1000 Digital 1 No
Ammeter of size 96x96mm on existing box/panel board
including connections etc., complete. CONZERVE/
ELMEASURE/ MECO/ HPL MAKE.
#REF! ELEC-7.12.4 Supply and erection of 0-100/ 200 / 400 / 600 /1000 Analog 1 No
Ammeter of size 96x96mm on existing box / panel board
including connections etc., complete. CONZERVE/
ELMEASURE/ MECO/ HPL MAKE.
#REF! ELEC-7.12.6 Supply and erection of Digital power factor meter, 3 phase, 4 1 No
wire balanced or unabalanced load 5A, 415V of size
96x96mm on existing box / panel board including connections
etc.,complete.CONZERVE/ELMEASURE/MECO/ HP MAKE.
#REF! ELEC-7.12.8 Supply and erection of selector switch for voltmeter / Ammeter 1 No
on the existing box / panel including connections etc.,
complete. L&T / C&S / SALZAR / HPL MAKE.
#REF! ELEC-7.12.9 Supply and erection of LED indicator lamps on the existing 1 No
box / panel board.L&T / C&S / SALZAR / HPL MAKE.
#REF! ELEC-7.12.10 Supply and erection of LT current transformer with bar primary 1 No
100/5A to 1000 / 5A ratio in the existing box / panel including
connections etc., complete. KAPPA MAKE.
#REF! ELEC-7.12.13 Supply and fixing of 8 Stage APFC Relay with connection etc 1 No
complete.(L&T / Siemens / EPCOS / Schneider / Elmeasure)
#REF! ELEC-7.12.14 Supply and fixing of 14 Stage APFC Relay with connection 1 No
etc complete.(L&T/ Siemens / EPCOS/ Schneider
/Elmeasure)
#REF! ELEC-7.13.5 Removing the existing transformer from the plinth / Pole and 1 No
refixing the standby transformer of following capacity
including connections etc., complete.- Upto 315 KVA
#REF! ELEC-7.13.6 Removing the existing transformer from the plinth / Pole and 1 No
refixing the standby transformer of following capacity
including connections etc., complete. -500 / 1000 KVA
#REF! ELEC-7.13.7 Replacing old and unserviceable gasket of top cover plate of 1 No
transformer having following capacity. -Upto 315 KVA
#REF! ELEC-7.13.8 Replacing old and unserviceable gasket of top cover plate of 1 No
transformer having following capacity. -500 / 1000 KVA
#REF! ELEC-7.13.11 Replacing old and unserviceable gasket of L.T bushing for 1 No
the following transformer capacity. Upto 315 KVA
#REF! ELEC-7.13.12 Replacing old and unserviceable gasket of L.T bushing for 1 No
the following transformer capacity. 500 / 1000 KVA
#REF! ELEC-7.13.16 Painting with 2 coats Zinchromate red oxide duly scraping 1 No
existing paint followed by 2 coats of hammerton grey paint
etc., complete. -Upto 500 KVA
#REF! ELEC-7.13.17 Painting with 2 coats Zinchromate red oxide duly scraping 1 No
existing paint followed by 2 coats of hammerton grey paint
etc., complete. - 630 / 1000 KVA
#REF! ELEC-7.13.23 Replacing L.T bushing metal parts for distribution Transformer 1 No
by new one for the following capacities. -250 / 315 KVA
#REF! ELEC-7.13.24 Replacing L.T bushing metal parts for distribution Transformer 1 No
by new one for the following capacities. -500 KVA
#REF! ELEC-7.13.25 Replacing L.T bushing metal parts for distribution Transformer 1 No
by new one for the following capacities. -1000 KVA
#REF! ELEC-7.13.26 Drying the repaired transformer with appropriate heat / air of 1 No
following capacity of transformers. -Upto 315 KVA
#REF! ELEC-7.13.27 Drying the repaired transformer with appropriate heat / air of 1 No
following capacity of transformers. -500 / 1000KVA
#REF! ELEC-7.13.30 Transformer oild tested as per IS-335 - 1972 (per Ltr) 1 Ltr
#REF! ELEC-7.13.31 Filteration of transformer oil as per ISS specifications filters to 1 Ltr
die electric strength above 40 K. V at site. (per Ltr)
#REF! ELEC-7.13.32 Filteration of transformer oil as per ISS specifications filters to 1 Ltr
die electric strength above 40 K. V at workshop (per Ltr)
#REF! ELEC-7.13.33 Supply of MPP type heavy duty capacitor of operating 1 KVAR
voltage not less than 480V and losses not more than 0.35W
per KVAR and inrush current withstand capability 300 times
the rated current. Makes:L&T/Siemens/Schneider/Eplos.
7.14 TRANSFORMERS
#REF! ELEC-7.14.1 Supply, transportation and delivery at site of 3 Phase, 50 Hz,
oil immersed and naturally cooled, outdoor / Indoor type
copper wound transformer designed and manufactured as
per IS 2026-1977 and 1st filling of oil as per IS 335 of 1993,
connected delta on primary side and Star on secondary side
with additional neutral brought out on load side, 1100V /
(433V / 415V) with HV tapping + or - 2.5% contineously rated
for full load and temporature rise not exceeding 50°C in oil
and 55°C rise by th resistance of the winding after contineous
run on full load rating complete with the following standard
mountings. Makes: Kirloskar / Vijay Electricals / PETE /
Esennar
#REF! ELEC-7.15.2 Supply and erecting porcelain disc type insulator suitable for 1 No
11KV line with suitable hardware on existing cross arms.
#REF! ELEC-7.15.3 Supply and erecting porcelain pin type insulator suitable for 1 No
11KV line with suitable hardware on existing cross arms.
#REF! ELEC-7.15.4 Supply and erecting porcelain post type insulator suitable for 1 No
11KV line with suitable hardware on existing cross arms.
#REF! ELEC-7.15.5 Supply and erecting porcelain pin/shackle type insulator 1 No
suitable for L. T.
#REF! ELEC-7.15.6 Approved made 11KV, 400A A.B switch with all standard 1 No
accessories etc., complete with cost and conveyance of all
materials.
#REF! ELEC-7.15.7 Approved made 11KV, 200A A.B switch with all standard 1 No
accessories etc.,complete with cost and conveyance of all
materials.
#REF! ELEC-7.15.8 Approved made 11KV, 200A A.B switch (tilting) with all 1 No
standard accessories etc., complete with cost and
conveyance of all materials.
#REF! ELEC-7.15.9 11KV, H.G fuse set including all standard accessories etc., 1 No
complete with cost and conveyance of all materials.
#REF! ELEC-7.15.12 Supply of 9.1 Mtr PSCC Pole 280 Kg Working load. 1 No
#REF! ELEC-7.15.13 Supply of 8.0 Mtr PSCC Pole 140 Kg Working load. 1 No
#REF! ELEC-7.15.19 Supply of down conductor of 1x70sqmm single core PVC 1 Mtr
insulated unarmoured copper conductor cable of ISI mark
(Make: Polycab /Havells / RPG / RR Kabel)
#REF! ELEC-8.1.14 Supply of 100 Pair raiser cable for telephone makes 1 Mtrs
Finolex / Delton / Surabi / Polycab.
#REF! ELEC-8.1.15 Supply of 10 Pair telephone Copper wire of makes Finolex / 1 Mtr
Delton / Surabi / Polycab / Nakoda.
#REF! ELEC-8.1.16 Supply of 20 Pair telephone Copper wire of makes Finolex / 1 Mtr
Delton / Surabi / Polycab / Nakoda.
#REF! ELEC-8.1.17 Supply of 50 Pair telephone Copper wire of makes Finolex / 1 Mtr
Delton / Surabi / Polycab.
#REF! ELEC-8.1.18 Supply of 10 pair Telephone distribution box with back mount 1 No
frame, krone connector, powder coated metal body
with lock and key arrangement.
#REF! ELEC-8.1.19 Supply of 20 pair Telephone distribution box with back mount 1 No
frame, krone connector, powder coated metal body with lock
and key arrangement.
#REF! ELEC-8.1.20 Supply of 50 pair Telephone distribution box with back mount 1 No
frame, krone connector, powder coated metal body with lock
and key arrangement.
#REF! ELEC-8.1.21 Supply of 200 pair Telephone distribution box with back 1 No
mount frame, krone connector, powder coated metal body
with lock and key arrangement.
#REF! ELEC-8.1.22 Supply of 6U floor mounting net work rack with power 1 No
spike including all accessories of make HCL / Vall.
#REF! ELEC-8.1.23 Supply of 9U floor mounting net work rack with power 1 No
spike including all accessories of make HCL / Vall.
#REF! ELEC-8.1.24 Supply of 12U floor mounting net work rack with power 1 No
spike including all accessories of make HCL / Vall.
#REF! ELEC-8.1.25 Supply of 15U floor mounting net work rack with power 1 No
spike including all accessories of make HCL / Vall.
#REF! ELEC-8.1.26 Supply of 17U floor mounting net work rack with power 1 No
spike including all accessories of make HCL / Vall.
#REF! ELEC-8.1.27 Supply of 42U floor mounting net work rack with power 1 No
spike including all accessories of make HCL / Vall.
#REF! ELEC-8.1.28 Supply of 6 Core (Indoor/ Out door),Single mode armourd, 1 Mtrs
Optic fibre cable of makes D Link / AMP / Molex / Legrand /
Krone.
#REF! ELEC-8.1.29 Supply of 12 Core (Indoor / Out door), Single mode armourd, 1 Mtrs
Optic fibre cable of makes D Link / AMP / Molex / Legrand /
Krone.
#REF! ELEC-8.1.30 Supply of 6 port fibre distribution unit. (FDU / LIU) loaded 1 No
with couplers etc complete of makes D Link / AMP / Molex
/Legrand / Krone.
#REF! ELEC-8.1.31 Supply of 12 port fibre distribution unit. (FDU / LIU) loaded 1 No
with couplers etc complete of makes D Link / AMP / Molex /
Legrand / Krone.
#REF! ELEC-8.1.32 Supply of Subscriber connector (SC) to SC / LC patch card 1 No
of 1 Mtr length of makes D Link / AMP / Molex /
Legrand / Krone.
#REF! ELEC-8.1.33 Supply of Pigtails for fibre core connectivity of makes D Link / 1 No
AMP / Molex / Legrand / Krone.
#REF! ELEC-8.1.34 Supply of Cat 6 RJ-45 information outlets including Single 1 No
face plate of makes D Link / AMP / Molex / Legrand / Krone.
#REF! ELEC-9.1.16 Stay tight set (Jum bracket 300 mm) Pair
#REF! ELEC-9.1.26 Acrylic Cover of size 4" x 7" for night lamps. 1 No
#REF! ELEC-9.1.36 PVC Insulated copper winding wire of fine quality (per K. G) 1 Kg
#REF! ELEC-9.1.43 6.2 Volt series bulb with navar plate(25 Nos.) 25 Nos
#REF! ELEC-9.1.46 Supply and fixing of 6mm thick Alluminium Chekered plate. 1 Kg
#REF! ELEC-9.1.50 Earth work excacvation including all soils for trench, Pole Pit 1 Cum
and Earth Pit.
#REF! ELEC-9.1.57 Drilling of 16 Nos through holes of 12mm dia to G.I pipe 1 No
#REF! ELEC-9.1.61 2" thick CC cover for hume pipe ring with handle. 1 No
#REF! ELEC-9.1.62 Supply of Saddle / Clamps suitable for fixing 2 Core 4 to 10 100 Nos
Sqmm Cable.
#REF! ELEC-9.1.63 Supply of Saddle / Clamps suitable for fixing 4 Core 4 & 6 100 Nos
Sqmm Cable.
#REF! ELEC-9.1.64 Supply of Saddle / Clamps suitable for fixing 4 Core 10 & 16 100 Nos
Sqmm Cable.
#REF! ELEC-9.1.65 Supply of Saddle / Clamps suitable for fixing 3.5 Core 25 & 35 100 Nos
Sqmm Cable.
#REF! ELEC-9.1.66 Supply of Saddle / Clamps suitable for fixing 3.5 Core 50 100 Nos
Sqmm Cable.
#REF! ELEC-9.1.67 Supply of Saddle / Clamps suitable for fixing 3.5 Core 70 & 95 100 Nos
Sqmm Cable.
#REF! ELEC-9.1.68 Supply of Saddle / Clamps suitable for fixing 3.5 Core 120 to 100 Nos
185 Sqmm Cable.
#REF! ELEC-9.1.69 Supply of Saddle / Clamps suitable for fixing 3.5 Core 240 & 100 Nos
300 Sqmm Cable.
#REF! ELEC-9.1.70 Supply of Saddle / Clamps suitable for fixing 3.5 Core 400 100 Nos
Sqmm Cable.
#REF! ELEC-9.1.71 Supply and fixing of anchor fastner with fan hook/ providing 1 No
MS fan hook with grouting and cement plastering
ELEC-9.1.72 Supply and fixing of PVC synthetic 1 No
elastomer electrically insulated mat with
class A insulation conforming to IS: 15652-
2006 having 2mm thickness upto 3.3KV
ELEC-9.1.73 Supply and fixing of PVC synthetic 1 No
elastomer electrically insulated mat with
Class B insulation conforming to IS: 15652-
2006 having 2.5mm thickness upto 11KV
ELEC-9.1.74 Supply and fixing of PVC synthetic 1 No
elastomer electrically insulated mat with
ClassC insulation conforming to IS: 15652-
2006 having 3mm thickness upto 33KV
ELEC-9.1.75 Supply of round bottom G.I sheet bucket of 1 No
9 Ltrs. Capacity as per IS:2546 made out of
24 gauge GI sheet with extra handle at
bottom duly painted inside and red out side
with printed with FIRE Mark for stand and
hook and filled with sand and arranged to
existing stand or hook. ( MR )
#REF! ELEC-10.1.3 Supply and fixing of Wireless Siren Strobe external wireless 1 No
siren - a fully supervised power code outdoor (IP55)
wireless Siren and strobe light. Designed for external
installation.Wire - Free connection between control panel and
siren. Convenient rapid no- mess installation. Separate fire
alarm signals, 98db Piezo siren and high power strobe light.
Weather resistant, IP55, 2-way communication for local and
remote diagnostics. Plug-in power supply, NIMH rechargeable
back-up power battery, transmits status, tamper, low- battery,
supervisory and AC loss messages to the control panel, Tri-
State tamper switch identifies screw manipulation removal of
cover or playing from the wall.(Cease Fire / Visonic /
Honeywell / Secutron) Including transportation, all taxes and
all labour charges etc complete.
#REF! ELEC-10.2.15 Supply and fixing of addressable wall mounting strobes cum 1 No
hooters including the cost of mounting accessories complete
as per specifications and as required including testing and
commissioning. (Makes: Notifier / Edwards).
#REF! ELEC-10.2.16 Supply and fixing of addressable wall mounting strobes cum 1 No
hooters including the cost of mounting accessories complete
as per specifications and as required including testing and
commissioning. (Makes: Siemens / Morley Bosch).
#REF! ELEC-10.3.8 Supply and installation of Repeater panel including the cost 1 No
of mounting accessories complete as per specifications and
as required. (Makes: System Censor / Ravel / Pinnacle)
#REF! ELEC-10.3.13 Supply and installation of plug -in type photo electric smoke 1 No
detectors including the cost of base plate. 75mm dia MS
outlet box for fixing of the detector base. Mounting
accessories etc complete and as per specifications and
as required. (Makes: System Censor / Ravel / Pinnacle)
#REF! ELEC-10.3.14 Supply and installation of plug -in type rate of rise cum fixed 1 No
temperature heat detectors including the cost of base
plate.75mm dia MS outlet box for fixing of the detector base,
mounting accessories etc., complete as per specifications
and as required. (Makes: System Censor /Ravel /Pinnacle)
#REF! ELEC-10.5.9 Supply and fixing of 4Nos of 9 Ltrs capacity round bottom 1 Set
sand buckets along with bucket sand, Fire buckets with
round bottom type enamel painted, white inside & red out
side and letter FIRE inblack out side & Handle with
mounting bracket.
#REF! ELEC-10.5.10 Supply anmd fixing of Fire bucket stand fabricated by 1 Set
M.S. angles to install for two numbers of buckets as per local
fire officers standards.
10.6 WATER MIST FIRE EXTINGUISHERS
ELEC-10.6.1 Extinguisher : Gross Weight – 23.9 kg.,
Weight of the empty firefighting system
without compressed air bottle and bottle
valve- 14.9 kg., Can Height – 560
MM,Diameter – 204MM, Weight of the gun-
1.9kg, Nominal charge- 9 Ltr., Recoil –
approx. 10N, Extinguishing Media Flow –
0.23 L/ sec, Water Discharge Hose – 13
MM, Discharge time minimum 25 Secs,
Range minimum 10 Meters, Compressed
Air to Gun – 10 MM, Applicable on Class A,
B, C & Electrically started Fires, ARating-
27A, BRating-233B, Compressed air bottle
(volume/pressure) - 2L / 300bar, Operating
pressure(dynamic)-approx 5.0 bar, Lancing
distance of the extinguishing agent-in spray
Approx. 7.0 m, in jet mode Approx, 12.0 m.
Operation time- approx 40 sec,
Extinguishing enhancement agent- Foam
Additive, CE and ERDA approved, Sheet
Metal Thickness – 1.5MM, 1 Year
Warranty.
Makes: Cease Fire or Equivalent
#REF! a)End suction back pull out centrifugal pump, Std fitted with
BRONZE IMPELLER & gland packing ,capacity 137 Cum/hr
(2280 LPM) at total head 70 mwc at operating speed 2900
rpm. Pump duty as per TAC
#REF! b) 45KW / 60 HP, 3000 srpm, TEFC (IP55) Horizontal foot
mounted, squirrel cage induction motor, suitable for 415
volts +/- 10%, 3 Ph, 50 Hz +/-5%, a.c.supply.
Class ‘F’ insulated and suitable for ambient temperature
up to 50 deg C. Motor in frame SC 225 M frame
#REF! ELEC-10.7.27 Supplying and fixing First -Aid Hose Reel with MS 1 No
construction spray painted in Post office Red, Conforming to
Is 884 with upto date amendments, complete with the
following as required.
#REF! a) 36.6 Mtr Long 20mm (Nominal internal) dia water hose
Thermoplastic / Textile reinforced / Rubber braided /
Polypropylene Type - 2 as per IS:12585 Make: Eversafe/
Reliance/ Newage/ SRI
#REF! b) 20mm (Nominal internal) dia gun metal globe valve and
nozzle. Make: Newage/ Winco/ Padmini
#REF! d) Connections from riser with 25mm dia stop valve (gun
metal) & MS pipe.
#REF! ELEC-10.7.28 Supplying and fixing of hose cabinet of size 750mm X 1 No
600mm x 250mm made of No 16 gauge SWG CRCA sheet
with 6mm thick glazed glass door including necessary
locking arrangement suitable to accommodate 2 Nos 15 mtr
long Hose pipe, 1 No branch pipe, mounted on wall OR raised
brick platform and duly painted with Post office red externally
and white internally with synthetic enamel paint complete in all
respect, for external hydrant as required.
#REF! ELEC-10.7.29 Supply and fixing 63mm dia Gun metal branch pipe with 1 No
20mm (Nominal internal diameter) size Gun metal / SS nozzle
conforming to IS 903, suitable for instantaneous connection to
interconnect hose pipe coupling as required. Make: Newage/
Winco/ Padmini
#REF! ELEC-10.7.30 Supply and fixing 4 way fire brigade connection of cast iron 1 No
body with 4 Nos Gun metal Male instantaneous inlet
couplings complete with cap and chain as required for
150mm dia MS pipe connection, conforming to IS 904 as
required.
#REF! ELEC-10.7.31 Supply and fixing 2 way fire brigade connection of cast iron 1 No
body with 2 Nos Gun metal Male instantaneous inlet
couplings complete with cap and chain as required for
100mm dia MS pipe connection, conforming to IS 904 as
required.
#REF! ELEC-10.7.32 Supply and fixing air vessel made of 250 mm dia, 8 mm thick 1 No
MS sheet, 1200mm in height with air release valve on top
and flanged connection to riser, drain arrangement with
25mm dia Gun metal wheel valve, with required accessories,
pressure gauge and painting with synthetic enamel paint of
approved shade as required.
#REF! ELEC-10.7.36 Providing and fixing Flow Switches in 100mm dia MS pipe. 1 No
Makes : System Sensor / Switzer / Approved makes
#REF! ELEC-10.7.37 Providing and fixing Flow Switches in 150 mm dia MS pipe. 1 No
Makes : System Sensor / Switzer / Approved makes
#REF! ELEC-10.7.38 Supply, installation, testing and commissioning of Bourden 1 No
type, stainless steel dial type pressure gauge with isolation
valve and pipe having calibration of 0-16 kg/cm2. MAKE:
HGURU/FIEBIG and Approved makes
#REF! ELEC-10.7.47 Supply and laying of 300mm dia NP2 RCC Hume pipe with AS per
Collars for Road crossings Civil
SSR
#REF! ELEC-10.7.48 Supplying and wrapping the anticorrosive material for
buried pipes with coating of Primer and wrapping with 4 mm
thick polymer corrosion resistant tape as per IS : 10221 with
15 mm overlap as per specificatios.
#REF! ELEC-10.7.52 Supply of 4 Core x 1.5Sqmm FRLS armoured copper cable as 1 Mtr
per IS. 7098 / Part-I / 1988 including all taxes etc., complete
of make Universal/ CCI /Unicab /Polycab /Finolex /KEI /
Havells.
#REF! ELEC-10.7.53 Supply of 4 Core x 2.5Sqmm FRLS armoured copper cable as 1 Mtr
per IS. 7098 / Part-I / 1988 including all taxes etc., complete
of make Universal/ CCI /Unicab/Polycab / Finolex / KEI /
Havells.
#REF! ELEC-10.7.54 Supply of 8 Core x 2.5Sqmm FRLS armoured copper cable as 1 Mtr
per IS. 7098 / Part-I / 1988 including all taxes etc., complete
of make Universal /CCI /Unicab / Polycab / Finolex /KEI /
Havells.
#REF! ELEC-10.7.55 Supply of 10 Core x 1.5Sqmm FRLS armoured copper cable 1 Mtr
as per IS. 7098 / Part-I / 1988 including all taxes etc.,
complete of make Universal/CCI / Unicab /Polycab /Finolex
/KEI /Havells.
#REF! ELEC-12.1.2 Supply and installation of 1400 VA,24 VDC home UPS 1 No
system pure sine wave out put, single phase input / Single
phase output. Makes: Servomax / Top Power / Amar Raja
#REF! ELEC-12.1.3 Supply and installation of 2000VA, 36VDC home UPS system
pure sine wave out put, single phase input / Single phase
output. Makes: Servomax / Top Power /Amar Raja /Samhitha.
All the items to be used on work are of first quality & ISI and as approved by the Engineer In charge of the wo
Supply Rates for all the materials are based on market rates plus Sales Tax/ Material VAT.
Works Contract VAT for General/ Composition Scheme on finished items may be allowed as applicable.
SOR Rates for Building items are purely for guidance for the officers for preparation of estimates vide para.113
APPWD code. Authority who prepares the estimate is however responsible for proper rates as envisaged in p
JUNE
Basic Rate
SS Rate for
201718
99.00
126.75
178.50
307.90
386.00
27.00
28.80
79.10
113.25
221.25
71.00
124.00
152.35
23.40
25.80
58.00
90.00
190.00
25.80
27.80
78.60
94.80
194.40
20.70
22.00
60.10
78.10
176.00
217.30
276.70
562.00
843.40
1333.50
211.00
220.00
409.50
705.00
892.50
116.00
149.00
244.00
326.00
420.00
60.00
72.00
165.00
300.00
172.00
488.60
254.00
379.00
19.10
24.20
25.40
31.80
42.50
58.40
81.40
18.50
24.30
25.40
31.80
36.90
63.50
17.30
18.50
3.70
4.90
6.10
12.20
19.40
11.00
14.00
28.00
30.00
61.00
17.00
19.00
34.00
37.00
51.00
22.00
25.00
40.00
43.00
64.00
4.00
6.00
16.00
19.00
28.00
4.00
57.00
80.00
96.00
130.00
170.00
209.00
53.00
63.00
79.00
105.00
184.00
236.00
10.00
18.00
22.00
30.00
48.00
73.00
109.00
14.00
25.00
33.00
44.00
73.00
109.00
164.00
53.00
51.00
182.00
262.00
327.00
59.00
72.00
89.00
96.00
108.00
131.00
1051.00
1555.00
2510.00
3833.00
5828.00
9030.00
14280.00
924.00
1358.00
2195.00
3360.00
5250.00
7980.00
13230.00
797.00
1150.00
1856.00
2783.00
4305.00
6825.00
10500.00
170.00
240.00
340.00
470.00
42.00
67.00
90.00
140.00
100.00
155.00
200.00
250.00
57.00
97.00
128.00
170.00
219.00
346.00
74.00
112.00
170.00
270.00
400.00
520.00
850.00
1274.00
1688.00
2380.00
121.00
170.00
240.00
332.01
141.80
202.61
250.00
354.00
140.00
206.00
292.00
450.00
761.25
1175.54
1611.75
2287.50
3518.44
737
1497.00
1611.00
2693.00
3017.00
3629.00
6804.00
1040.00
5430.00
8340.00
12510.00
18430.00
29960.00
5717.00
8778.00
13167.00
19404.00
31532.00
18.00
21.00
20.00
27.00
20.00
35.00
21.00
65.00
65.00
102.00
50.00
220.00
21.00
20.00
17.00
48.00
26.00
32.00
106.00
50.00
45.00
102.00
240.00
450.00
21.00
310.00
410.00
15.00
19.00
15.00
20.00
18.00
28.00
18.00
55.00
55.00
85.00
44.00
180.00
16.00
85.00
23.00
26.00
24.00
35.00
28.00
26.00
28.00
39.00
80.00
110.00
49.00
240.00
54.00
35.00
40.00
92.00
101.00
93.00
141.00
117.00
137.00
126.00
126.00
138.00
138.00
188.00
196.00
158.00
473.00
100.00
98.00
63.00
75.00
64.00
93.00
75.00
90.00
83.00
83.00
95.00
91.00
133.00
135.00
65.00
375.00
65.00
64.00
65.00
77.00
89.00
130.00
172.00
210.00
56.00
69.00
81.00
108.00
137.00
167.00
1351.00
2329.00
5578.00
7280.00
8740.00
13445.00
22759.00
1129.00
1692.00
3827.00
5783.00
6521.00
9960.00
16538.00
4135.00
7828.00
10474.00
14884.00
22712.00
27012.00
3749.00
7283.00
9639.00
13709.00
21313.00
25597.00
1438.00
1318.00
4594.00
7006.00
760.00
2670.00
5019.00
936.00
1446.00
3302.00
6148.00
6190.00
9025.00
620.00
1033.00
2350.00
4579.00
4730.00
7747.00
50.00
77.00
248.00
363.00
704.00
1425.00
99.00
123.00
259.00
484.00
891.00
1182.00
8000.00
15000.00
6400.00
12000.00
6060.00
7194.00
16025.00
21690.00
6813.00
8700.00
20818.00
26208.00
4229.00
5530.00
14823.00
5668.00
7270.00
18010.00
19000.00
22890.00
104444.00
129841.00
139793.00
173174.00
147276.00
182744.00
154780.00
194892.00
94000.00
125813.00
116857.00
155832.00
132548.00
164470.00
13328.00
5385.00
4665.00
34800.00
15000.00
46550.00
10413.00
32750.00
40850.00
44550.00
41600.00
201.00
423.00
595.00
962.00
955.00
1477.00
1281.00
1899.00
162.00
356.00
512.00
701.00
818.00
1134.00
1062.00
1424.00
121.00
221.00
335.00
501.00
612.00
945.00
787.00
1112.00
338.00
367.00
488.00
624.00
725.00
814.00
890.00
956.00
318.00
334.00
411.00
585.00
590.00
678.00
734.00
918.00
215.00
258.00
345.00
383.00
428.00
572.00
2700.00
3300.00
2900.00
3135.00
3300.00
3330.00
3515.00
4000.00
2152.00
2902.00
2118.00
2780.00
2118.00
2558.00
2947.00
1880.00
760.00
800.00
1045.00
990.00
1245.00
1505.00
463.00
606.00
695.00
800.00
1130.00
1350.00
328.00
446.00
547.00
551.00
756.00
957.00
1500.00
3750.00
2491.00
7770.00
6045.00
7843.00
9823.00
901.00
1700.00
2000.00
1395.00
2200.00
3500.00
5600.00
6825.00
1275.00
1650.00
2530.00
3240.00
5170.00
450.00
925.00
1500.00
250.00
366.00
590.00
1200.00
1500.00
1260.00
990.00
3265.00
2570.00
4790.00
3975.00
5500.00
4340.00
7575.00
5765.00
14770.00
536.00
1071.00
2025.00
1838.00
3822.00
709.00
643.00
775.00
652.00
643.00
615.00
1005.00
902.00
1428.00
1223.00
2089.00
1696.00
180.00
95.00
160.00
190.00
260.00
415.00
460.00
2450.00
3350.00
4200.00
108.00
60.00
130.00
80.00
495.00
400.00
710.00
600.00
770.00
680.00
840.00
780.00
605.00
530.00
900.00
800.00
890.00
850.00
990.00
900.00
1350.00
1100.00
1540.00
1400.00
11000.00
11500.00
13100.00
14400.00
14900.00
18000.00
678.00
578.00
813.00
766.00
1222.00
1173.00
2300.00
3400.00
3749.00
750.00
126.00
110.00
120.00
110.00
160.00
146.00
160.00
145.00
210.00
170.00
11.00
8.00
21.00
17.00
53.00
42.00
32.00
25.00
15.00
12.00
614.00
275.00
1615.00
4300.00
850.00
540.00
350.00
215.00
385.00
12.00
11.00
41.00
45.00
38.00
120.00
75.00
80.00
105.00
115.00
160.00
135.00
115.00
125.00
135.00
110.00
180.00
170.00
200.00
200.00
1060.00
800.00
800.00
600.00
540.00
1600.00
1000.00
1300.00
1150.00
2350.00
1960.00
1610.00
1260.00
1170.00
1050.00
2890.00
2210.00
1610.00
1870.00
1660.00
1520.00
1400.00
1200.00
1100.00
1300.00
1100.00
1000.00
5350.00
4760.00
4420.00
5180.00
4420.00
4160.00
5780.00
5350.00
475.00
150.00
70.00
175.00
250.00
299.00
250.00
5000.00
8400.00
8600.00
14400.00
14600.00
19000.00
23000.00
25500.00
28500.00
33320.00
4900.00
6430.00
8075.00
10200.00
12410.00
14025.00
19550.00
21675.00
24225.00
28320.00
4420.00
5780.00
7310.00
9180.00
12620.00
16150.00
19550.00
21670.00
24225.00
10620.00
14870.00
19970.00
8920.00
13170.00
16570.00
250.00
235.00
375.00
350.00
580.00
545.00
700.00
660.00
420.00
395.00
890.00
840.00
1700.00
1600.00
15800.00
17900.00
20500.00
22000.00
4400.00
5200.00
5800.00
6400.00
92.00
78.00
108.00
93.00
129.00
112.00
130.00
112.00
147.00
128.00
162.00
140.00
207.00
180.00
247.00
212.00
326.00
280.00
421.00
363.00
547.00
472.00
669.00
579.00
762.00
658.00
934.00
806.00
1185.00
1023.00
1449.00
1251.00
1815.00
1568.00
603.00
683.00
816.00
972.00
1104.00
1248.00
1475.00
1680.00
1900.00
327.00
491.00
578.00
654.00
94.00
138.00
264.00
22.00
30.00
33.00
40.00
55.00
65.00
88.00
104.00
149.00
215.00
284.00
418.00
12.00
14.00
17.00
20.00
25.00
27.00
35.00
40.00
46.00
71.00
92.00
119.00
1300.00
1545.00
2230.00
4000.00
5425.00
15070.00
18095.00
23018.00
8211.00
8321.00
8925.00
9500.00
12452.00
12562.00
13750.00
14200.00
97.00
124.00
152.00
163.00
254.00
376.00
494.00
576.00
1300.00
960.00
845.00
725.00
400.00
200.00
300.00
550.00
1760.00
2220.00
1840.00
2160.00
2352.00
2714.00
6000.00
6600.00
1550.00
1350.00
1265.00
2645.00
3220.00
4100.00
9300.00
10900.00
400.00
275.00
275.00
165.00
780.00
1450.00
2490.00
14700.00
14000.00
16800.00
16000.00
17325.00
16500.00
21000.00
20000.00
25200.00
24000.00
31500.00
28350.00
35500.00
31950.00
39900.00
35910.00
39300.00
35370.00
43500.00
39150.00
44600.00
40140.00
46000.00
41400.00
47500.00
42750.00
54000.00
48600.00
46000.00
41400.00
56000.00
50400.00
60000.00
54000.00
62000.00
55800.00
11550.00
11000.00
13125.00
12500.00
17850.00
17000.00
17850.00
17000.00
22050.00
21000.00
26250.00
25000.00
33600.00
32000.00
5145.00
4900.00
7455.00
7100.00
9975.00
9500.00
12600.00
12000.00
14700.00
14000.00
19950.00
19000.00
24150.00
23000.00
4800.00
179.00
231.00
306.00
319.00
489.00
84.00
40.00
38.00
795069.00
380.00
450.00
650.00
780.00
1000.00
1100.00
1300.00
1490.00
1600.00
2000.00
175.00
240.00
300.00
209.00
350.00
380.00
200.00
300.00
400.00
150.00
300.00
42990.00
39600.00
53490.00
46990.00
50250.00
56490.00
54500.00
59990.00
53550.00
58990.00
65910.00
69295.00
82000.00
130090.00
137940.00
131800.00
125000.00
150970.00
115000.00
116300.00
155170.00
133000.00
168190.00
80000.00
82500.00
58380.00
68838.00
1000.00
1000.00
8150.00
9250.00
1590.00
156.00
410.00
200.00
242.00
225.00
485.00
225.00
475.00
325.00
400.00
560.00
427.00
1700.00
115.00
1500.00
2100.00
720.00
3100.00
3750.00
1590.00
125.00
40.00
1500.00
400.00
3000.00
2500.00
2000.00
1500.00
1750.00
110000.00
130000.00
180000.00
81.90
75.00
60.00
675.00
4800.00
4000.00
990.00
810.00
1805.00
1615.00
2250.00
2070.00
3000.00
2850.00
3600.00
3425.00
71.00
65.00
65.00
10647.00
9147.00
15722.00
13507.00
17000.00
14098.00
25040.00
22536.00
1215.00
1604.00
3800.00
4500.00
1500
2700.00
4950.00
8500.00
103354.00
88790.00
134879.00
121391.00
168256.00
151430.00
28884.00
30473.00
28073.00
35794.00
45551.00
14580.00
13122.00
16740.00
15066.00
1220.00
1750.00
2385.00
2830.00
3200.00
4500.00
6000.00
7500.00
8908.00
11168.00
14275.00
18795.00
27268.00
1650.00
1650.00
1980.00
2310.00
5500.00
4340.00
4030.00
3565.00
2500.00
450.00
2500.00
450.00
4556.00
2700.00
10023.00
175.00
135.00
450.00
1050.00
3037.00
13600.00
16900.00
4000.00
2500.00
4350.00
500.00
2500.00
3500.00
750.00
1050.00
300.00
550.00
700.00
1450.00
590.00
390.00
300.00
3000.00
4000.00
350.00
380.00
165.00
175.00
300.00
500.00
1300.00
2000.00
3000.00
4200.00
4500.00
6800.00
120.00
8.00
5.00
350.00
165000.00
180000.00
295000.00
325000.00
375000.00
550000.00
400000.00
645000.00
735000.00
910000.00
1500.00
600.00
300.00
675.00
90.00
7000.00
6100.00
5900.00
4000.00
25013.00
15383.00
3129.00
1665.00
50.00
128000.00
31200.00
16000.00
11500.00
410.00
1010.00
2800.00
2300.00
4400.00
340.00
15600.00
6700.00
1235.00
12500.00
220.00
200.00
6500.00
3680.00
387.00
40.00
76.00
195.00
650.00
990.00
2070.00
7900.00
4700.00
5580.00
6484.00
7348.00
10125.00
32000.00
75.00
105.00
7500.00
9500.00
2000.00
350.00
250.00
460.00
605.00
1035.00
435.00
560.00
1010.00
340.00
430.00
830.00
165.00
28.00
44.00
55.00
13.00
24.00
44.00
73.00
15.00
10.00
330.00
440.00
61.00
17.00
25.00
300.00
200.00
75.00
30.00
80.00
100.00
75.00
90.00
250.00
61.00
17.00
7.00
83.00
22.00
1100.00
200.00
250.00
500.00
605.00
605.00
726.00
605.00
701.00
68.00
234.00
322.00
91.00
97.00
16500.00
67.00
266.00
165.00
6.60
0.60
220.00
594.00
3819.00
226.00
242.00
355.00
381.00
6.00
11.00
220.00
275.00
121.00
249.00
249.00
314.00
382.00
545.00
605.00
726.00
908.00
1210.00
88.00
4200.00
4200.00
4200.00
355.00
1800.00
40000.00
9400.00
13200.00
6500.00
620000.00
580000.00
450000.00
410000.00
415000.00
370000.00
280000.00
250000.00
235000.00
210000.00
200000.00
190000.00
118750.00
100000.00
5770.00
4700.00
5900.00
5300.00
5800.00
5100.00
5059.00
4560.00
6175.00
5558.00
5225.00
4655.00
5225.00
4655.00
4275.00
3800.00
7500.00
9900.00
13750.00
15950.00
20350.00
22550.00
27500.00
13750.00
675.00
650.00
150.00
1800.00
1500.00
1450.00
9180.00
5900.00
6370.00
4100.00
4500.00
2900.00
7200.00
5600.00
12960.00
11000.00
23490.00
21000.00
10900.00
8200.00
1300.00
15010.00
1200.00
1000.00
183200.00
46550.00
2375.00
2755.00
3135.00
70775.00
114000.00
38000.00
66975.00
8075.00
354000.00
390000.00
446400.00
468000.00
678000.00
762000.00
268750.00
556250.00
218750.00
443750.00
161250.00
387500.00
55000.00
77860.00
62450.00
48400.00
46245.00
42542.00
3245.00
3210.00
2800.00
2400.00
1930.00
1515.00
1275.00
1000.00
895.00
750.00
675.00
600.00
530.00
512.00
400.00
330.00
300.00
270.00
8125.00
12525.00
5300.00
4350.00
3400.00
3100.00
5000.00
4000.00
3725.00
3500.00
1723.00
17007.00
11849.00
7631.00
5088.00
3812.00
3067.00
1750.00
1400.00
1250.00
6140.00
5510.00
7500.00
3250.00
2530.00
9100.00
6900.00
16000.00
490.00
1200.00
2500.00
5375
7500.00
675.00
1175.00
650.00
1250.00
1000.00
1200.00
1400.00
9500.00
24790.00
13280.00
7450.00
5100.00
45.00
40.00
30.00
60.00
95.00
125.00
120.00
165.00
275.00
235.00
385875.00
496125.00
617400.00
810000.00
1100000.00
1433250.00
2205000.00
2866500.00
9500.00
13500.00
19200.00
29400.00
39507.00
68250.00
94500.00
110250.00
185000.00
212000.00
1500.00
2875.00
5175.00
3850.00
6446.00
7970.00
9900.00
10500.00
9965.00
12750.00
Outer diameter in
Cement Cost W
Add CP & OH on
ID) x 0.785x2.1 /
than at Ends in
Cost = W x IF x
(OD+ID) x (OD-
Dia of Pipes in
Actual Rate of
Weight /Rm =
Basic Rate of
Pipe per Rmt
Thickness at
Ends in mm
charges @
x IC x 0.85
1000 (Kg.)
Add ST @
Transport
CED @
S N0
0.15
mm
mm
mm
pipe
W IC IF 10% 13.615% 0.00% 0%
1 80 mm dia 9.50 11.50 103.00 6.94 203.00 -1.210 0.000 201.79 20.18 27.47 0 0.00 249.44
2 100 mm dia 10.00 12.00 124.00 8.86 267.00 -1.550 0.000 265.45 26.55 36.14 0 0.00 328.14
3 125 mm dia 11.00 13.00 151.00 11.83 348.00 -2.070 0.000 345.93 34.59 47.10 0 0 427.62
4 150 mm dia 13.00 15.00 180.00 16.32 489.00 -2.860 0.000 486.14 48.61 66.19 0 0 600.94
5 200 mm dia 16.50 18.50 237.00 26.65 809.00 -4.670 0.000 804.33 80.43 109.51 0 0 994.27
6 250 mm dia 17.00 19.00 288.00 33.70 1026.00 -5.900 0.000 1020.10 102.01 138.89 0 0 1261.00
7 300 mm dia 20.00 22.00 344.00 46.71 1435.00 -8.180 0.000 1426.82 142.68 194.26 0 0 1763.76
8 350 mm dia 21.00 23.00 396.00 56.57 1747.00 -9.910 0.000 1737.09 173.71 236.50 0 0 2147.30
9 400 mm dia 24.00 26.00 452.00 73.04 2271.00 -12.790 0.000 2258.21 225.82 307.46 0 0 2791.49
10 450 mm dia 26.50 28.50 507.00 89.92 2701.00 -15.750 0.000 2685.25 268.53 365.60 0 0 3319.38
11 500 mm dia 29.00 31.00 562.00 108.54 3331.00 -19.010 0.000 3311.99 331.20 450.93 0 0 4094.12
12 600 mm dia 35.00 37.00 674.00 155.41 4737.00 -27.210 0.000 4709.79 470.98 641.24 0 0 5822.01
13 700 mm dia 37.00 39.00 778.00 190.05 6238.00 -33.280 0.000 6204.72 620.47 844.77 0 0 7669.96
14 750 mm dia 39.50 41.50 833.00 216.59 7108.00 -37.930 0.000 7070.07 707.01 962.59 0 0 8739.67
15 800 mm dia 42.50 44.50 889.00 247.80 8132.00 -43.390 0.000 8088.61 808.86 1101.26 0 0 9998.73
16 850 mm dia 45.00 47.00 944.00 278.00 9124.00 -48.680 0.000 9075.32 907.53 1235.60 0 0 11218.45
17 900 mm dia 47.50 49.50 999.00 309.92 10171.00 -54.270 0.000 10116.73 1011.67 1377.39 0 0 12505.79
18 1000 mm dia 53.00 55.00 1110.00 382.62 12555.00 -67.000 0.000 12488.00 1248.80 1700.24 0 0 15437.04
2 AC Class -20 : per RMT Sep-18
Market 4600.00 Market 78500.00
Cement Rate as per SSR 4806.00 Fiber Rate as per SSR 78500.00
Variation -0.21 Variation 0.000
Add CP & OH on
Variation in fiber
Thickness other
ID) x 0.785x2.1 /
W
than at Ends in
Outer diameter
(OD+ID) x (OD-
Dia of Pipes in
Actual Rate of
Basic Rate of
Weight /Rm =
W x IC x 0.85
Thickness at
Total cost of
Ends in mm
Cement Cost
charges @
x IF x 0.15
1000 (Kg.)
Add ST @
Transport
CED @
in mm
S N0
Pipe
pipe
mm
mm
Cost =
W IC IF 13.615% 0.00% 0%
1 80 mm dia 11.00 13.00 106.00 7.97 223.00 -1.400 0.000 221.81 22.30 30.20 0.00 0.00 274.31
2 100 mm dia 13.50 15.50 131.00 11.80 340.00 -2.070 0.000 338.24 34.00 46.05 0.00 0.00 418.29
3 125 mm dia 14.00 16.00 157.00 14.88 432.00 -2.600 0.000 429.79 43.20 58.52 0.00 0.00 531.51
4 150 mm dia 16.50 18.50 187.00 20.56 610.00 -3.600 0.000 606.94 61.00 82.63 0.00 0.00 750.57
5 200 mm dia 22.00 24.00 248.00 35.45 1037.00 -6.210 0.000 1031.72 103.70 140.47 0.00 0.00 1275.89
6 250 mm dia 23.00 25.00 300.00 45.33 1331.00 -7.940 0.000 1324.25 133.10 180.30 0.00 0.00 1637.65
7 300 mm dia 27.00 29.00 358.00 62.91 1871.00 -11.020 0.000 1861.63 187.10 253.46 0.00 0.00 2302.19
8 350 mm dia 27.50 29.50 409.00 73.82 2273.00 -12.930 0.000 2262.01 227.30 307.97 0.00 0.00 2797.28
9 400 mm dia 32.00 34.00 468.00 97.30 2974.00 -17.040 0.000 2959.52 297.40 402.94 0.00 0.00 3659.86
10 450 mm dia 35.50 37.50 525.00 120.55 3587.00 -21.110 0.000 3569.06 358.70 485.93 0.00 0.00 4413.69
11 500 mm dia 39.00 41.00 582.00 146.26 4384.00 -25.610 0.000 4362.23 438.40 593.92 0.00 0.00 5394.55
12 600 mm dia 46.00 48.00 696.00 205.10 6190.00 -35.910 0.000 6159.48 619.00 838.61 0.00 0.00 7617.09
13 700 mm dia 50.00 52.00 804.00 257.85 8460.00 -45.150 0.000 8421.62 846.00 1146.60 0.00 0.00 10414.22
14 750 mm dia 54.00 56.00 862.00 297.63 9767.00 -52.110 0.000 9722.71 976.70 1323.75 0.00 0.00 12023.16
15 800 mm dia 57.50 59.50 919.00 337.22 11066.00 -59.050 0.000 11015.81 1106.60 1499.80 0.00 0.00 13622.21
16 850 mm dia 61.00 63.00 976.00 379.28 12448.00 -66.410 0.000 12391.55 1244.80 1687.11 0.00 0.00 15323.46
17 900 mm dia 64.50 66.50 1033.00 423.81 13908.00 -74.210 0.000 13844.92 1390.80 1884.99 0.00 0.00 17120.71
18 1000 mm dia 71.50 73.50 1147.00 520.28 17074.00 -91.100 0.000 16996.57 1707.40 2314.08 0.00 0.00 21018.05
A.C. COUPLINGS - for Class - 15 Pipes
1.A MANUFACTURE AS PER MANUFACTURERS SPECIFICATION (MAZZA PROCESS) AND SUPPLY OF A.C. COUPLINGS EXCLUDING COST OF
TO SUIT AC PRESSURE PIPES INCLUDING COST OF MATERIAL, INCIDENTAL HANDLING, PACKING TRANSPORTATION AND UNLOADING
RISK , EXCISE DUTY, VAT AND OTHER GOVT. LEVIES.
W x IF
Variation in Cement
Cost W x IC x 0.85
Dia of collor in mm
OD+ID) x (OD-ID) x
Thickness at Ends
Outer diameter in
Inner diameter in
Variation in fiber
Weight /Each =
Actual Rate of
each coupling
Add CP & OH
Total cost of
/1000 (Kg.)
per each
Add ST @
Coupling
Length
CED @
in mm
x 0.15
mm
mm
SN
Cost =
W IC IF 13.615% 0.00% 0%
1 80 mm dia 16.50 103.50 136.50 160.00 2.089 96.00 -0.370 0.000 95.63 13.02 0 0.00 108.65
2 100 mm dia 17.00 125.00 159.00 160.00 2.547 123.00 -0.450 0.000 122.55 16.69 0 0.00 139.24
3 125 mm dia 18.00 151.00 187.00 160.00 3.209 155.00 -0.560 0.000 154.44 21.03 0 0.00 175.47
4 150 mm dia 20.00 180.50 220.50 160.00 4.231 180.00 -0.740 0.000 179.26 24.41 0 0.00 203.67
5 200 mm dia 23.50 237.50 284.50 180.00 7.280 331.00 -1.270 0.000 329.73 44.89 0 0.00 374.62
6 250 mm dia 24.00 288.50 336.50 180.00 8.902 387.00 -1.560 0.000 385.44 52.48 0 0.00 437.92
7 300 mm dia 27.00 344.50 398.50 180.00 11.905 506.00 -2.080 0.000 503.92 68.61 0 0.00 572.53
8 350 mm dia 29.50 396.00 455.00 180.00 14.899 654.00 -2.610 0.000 651.39 88.69 0 0.00 740.08
9 400 mm dia 32.50 452.00 517.00 220.00 22.843 1009.00 -4.000 0.000 1005.00 136.83 0 0.00 1141.83
10 450 mm dia 35.00 502.00 572.00 220.00 27.266 1208.00 -4.770 0.000 1203.23 163.82 0 0.00 1367.05
11 500 mm dia 37.50 558.50 633.50 220.00 32.423 1440.00 -5.680 0.000 1434.32 195.28 0 0.00 1629.60
12 600 mm dia 43.50 669.50 756.50 220.00 44.994 1776.00 -7.880 0.000 1768.12 240.73 0 0.00 2008.85
13 700 mm dia 45.50 773.00 864.00 220.00 54.026 2335.00 -9.460 0.000 2325.54 316.62 0 0.00 2642.16
14 750 mm dia 48.00 828.00 924.00 220.00 60.998 2635.00 -10.680 0.000 2624.32 357.30 0 0.00 2981.62
15 800 mm dia 51.00 884.00 986.00 220.00 69.176 2989.00 -12.110 0.000 2976.89 405.30 0 0.00 3382.19
16 850 mm dia 53.50 939.00 1046.00 220.00 77.029 3330.00 -13.490 0.000 3316.51 451.54 0 0.00 3768.05
17 900 mm dia 56.00 994.00 1106.00 220.00 85.300 3684.00 -14.940 0.000 3669.06 499.54 0 0.00 4168.60
18 1000 mm dia 61.50 1105.00 1228.00 220.00 104.071 4497.00 -18.220 0.000 4478.78 609.79 0 0.00 5088.57
A.C. COUPLINGS - for Class - 20 Pipes
2 MANUFACTURE AS PER MANUFACTURERS SPECIFICATION (MAZZA PROCESS) AND SUPPLY OF A.C. COUPLINGS EXCLUDING COST O
TO SUIT AC PRESSURE PIPES INCLUDING COST OF MATERIAL, INCIDENTAL HANDLING, PACKING TRANSPORTATION AND UNLOADING
RISK , EXCISE DUTY, VAT AND OTHER GOVT. LEVIES.
(OD-ID) x Length x
W x IF x 0.15
W x IC x 0.85
Add CP & OH
Add ST @
coupling
Length
CED @
each
SN
W IC IF 13.62% 0.00% 0%
1 80 mm dia 18.00 105.50 141.50 160.00 2.35 102.00 -0.410 0.000 101.59 13.83 0 0.00 115.42
2 100 mm dia 20.50 130.50 171.50 160.00 3.27 134.00 -0.570 0.000 133.43 18.17 0 0.00 151.60
3 125 mm dia 21.00 156.50 198.50 160.00 3.93 169.00 -0.690 0.000 168.31 22.92 0 0.00 191.23
4 150 mm dia 23.50 187.00 234.00 160.00 5.22 226.00 -0.910 0.000 225.09 30.65 0 0.00 255.74
5 200 mm dia 29.00 246.50 304.50 180.00 9.48 365.00 -1.660 0.000 363.34 49.47 0 0.00 412.81
6 250 mm dia 30.00 298.50 358.50 180.00 11.70 490.00 -2.050 0.000 487.95 66.43 0 0.00 554.38
7 300 mm dia 34.00 356.50 424.50 180.00 15.76 656.00 -2.760 0.000 653.24 88.94 0 0.00 742.18
8 350 mm dia 36.00 409.00 481.00 180.00 19.01 845.00 -3.330 0.000 841.67 114.59 0 0.00 956.26
9 400 mm dia 40.50 467.00 548.00 220.00 29.82 1316.00 -5.220 0.000 1310.78 178.46 0 0.00 1489.24
10 450 mm dia 44.00 519.00 607.00 220.00 35.94 1592.00 -6.290 0.000 1585.71 215.89 0 0.00 1801.60
11 500 mm dia 47.50 576.50 671.50 220.00 43.00 1924.00 -7.530 0.000 1916.47 260.93 0 0.00 2177.40
12 600 mm dia 54.50 690.50 799.50 220.00 58.90 2231.00 -10.310 0.000 2220.69 302.35 0 0.00 2523.04
13 700 mm dia 58.50 799.00 916.00 220.00 72.77 3145.00 -12.740 0.000 3132.26 426.46 0 0.00 3558.72
14 750 mm dia 62.50 857.00 982.00 220.00 83.37 3601.00 -14.600 0.000 3586.40 488.29 0 0.00 4074.69
15 800 mm dia 66.00 914.00 1046.00 220.00 93.83 4052.00 -16.430 0.000 4035.57 549.44 0 0.00 4585.01
16 850 mm dia 69.50 971.00 1110.00 220.00 104.91 4533.00 -18.370 0.000 4514.63 614.67 0 0.00 5129.30
17 900 mm dia 73.00 1028.00 1174.00 220.00 116.60 5040.00 -20.420 0.000 5019.58 683.42 0 0.00 5703.00
18 1000 mm dia 80.00 1142.00 1302.00 220.00 141.82 6127.00 -24.830 0.000 6102.17 830.81 0 0.00 6932.98
SCHEDULE OF RATE FOR SUPLY OF RUBBER RINGS MANUFACTURED AS PER BIS:
5382/1988 WITH BIS MARK EMBOSSED PER EACH SET SUITABLE FOR A.C. COUPLINGS
INCLUDING COST OF MATERIAL, INCIDENTAL, HANDLING, PACKING, TRANSPORTATION
AND UNLOADING AT SITE TRANSIT RISK ETC.,
Rate including
Over heads
Over heads
Add VAT @
0%
0.00 221.97 249.44
0.00 292.00 328.14
0.00 380.52 427.62
0.00 534.75 600.94
0.00 884.76 994.27
0.00 1122.11 1261.00
0.00 1569.50 1763.76
0.00 1910.80 2147.30
0.00 2484.03 2791.49
0.00 2953.78 3319.38
0.00 3643.19 4094.12
0.00 5180.77 5822.01
0.00 6825.19 7669.96
0.00 7777.08 8739.67
0.00 8897.47 9998.73
0.00 9982.85 11218.45
0.00 11128.40 12505.79
0.00 13736.80 15437.04
Rate excluding
Rate including
Over heads
Over heads
Add VAT @
0%
0.00 244.11 274.31
0.00 372.24 418.29
0.00 472.99 531.51
0.00 667.94 750.57
0.00 1135.42 1275.89
0.00 1457.35 1637.65
0.00 2048.73 2302.19
0.00 2489.31 2797.28
0.00 3256.92 3659.86
0.00 3927.76 4413.69
0.00 4800.63 5394.55
0.00 6778.48 7617.09
0.00 9267.62 10414.22
0.00 10699.41 12023.16
0.00 12122.41 13622.21
0.00 13636.35 15323.46
0.00 15235.72 17120.71
0.00 18703.97 21018.05
UDING COST OF RUBBER RINGS
ND UNLOADING AT SITE TRANSIT
heads
0%
0.00 95.63 108.65
0.00 122.55 139.24
0.00 154.44 175.47
0.00 179.26 203.67
0.00 329.73 374.62
0.00 385.44 437.92
0.00 503.92 572.53
0.00 651.39 740.08
0.00 1005.00 1141.83
0.00 1203.23 1367.05
0.00 1434.32 1629.60
0.00 1768.12 2008.85
0.00 2325.54 2642.16
0.00 2624.32 2981.62
0.00 2976.89 3382.19
0.00 3316.51 3768.05
0.00 3669.06 4168.60
0.00 4478.78 5088.57
UDING COST OF RUBBER RINGS
ND UNLOADING AT SITE TRANSIT
Rate excluding Over
heads
heads
0%
0.00 101.59 115.42
0.00 133.43 151.60
0.00 168.31 191.23
0.00 225.09 255.74
0.00 363.34 412.81
0.00 487.95 554.38
0.00 653.24 742.18
0.00 841.67 956.26
0.00 1310.78 1489.24
0.00 1585.71 1801.60
0.00 1916.47 2177.40
0.00 2220.69 2523.04
0.00 3132.26 3558.72
0.00 3586.40 4074.69
0.00 4035.57 4585.01
0.00 4514.63 5129.30
0.00 5019.58 5703.00
0.00 6102.17 6932.98
Page 1379 of 2191
Manufacture,supply and delivery of RCC Plain Ended Pipes confirming to B.I.S. 458/2003 ex-Factory, ( Rate per Meter of effective length
including Transportation, Central Excice Duty, Sales Tax but Excluding VAT etc.complete.
Cost of RCC Plain Ended NP2 & NP3 Pipes & Conveyance Charges - 2017-18
Basic Rate up
Rate for
Rate of Cement Variation Variation Actual to 5 Rate
Dia of MS rods every Add over
S Pipe per required in in MS Rate of Kms Total lead Add VAT & excluding
Pipes in required additional 1 heads on Sub-total
N0 Rmt per 1 Cement rods Pipe per Lead charges LC @ Over
mm per 1 Rmt KM lead or pipe
Rmt Cost Cost Rmt heads
part thereof
( Table-1) (Table-6)
P1 Wc R1 Ws R2 R1+R2 13.62% 0%
1 100mm 165.00 3.60 -0.74 0.77 10.29 174.55 4.60 0.15 5.35 23.76 203.66 0.00 179.90
2 150mm 198.00 3.60 -0.74 0.83 11.09 208.35 6.90 0.30 8.40 28.37 245.12 0.00 216.75
3 200mm 239.00 7.20 -1.48 0.97 12.96 250.48 9.20 0.30 10.70 34.10 295.28 0.00 261.18
4 225mm 258.00 7.20 -1.48 1.05 14.03 270.55 10.40 0.46 12.70 36.84 320.09 0.00 283.25
5 250mm 275.00 7.20 -1.48 1.17 15.64 289.16 11.60 0.46 13.90 39.37 342.43 0.00 303.06
6 300mm 395.00 10.80 -2.22 1.57 20.98 413.76 16.20 0.61 19.25 56.33 489.34 0.00 433.01
7 350mm 494.00 14.40 -2.97 1.91 25.53 516.56 23.10 1.39 30.05 70.33 616.94 0.00 546.61
8 400mm 568.00 14.40 -2.97 2.27 30.34 595.37 25.40 1.53 33.05 81.06 709.48 0.00 628.42
9 450mm 694.00 18.00 -3.71 2.75 36.75 727.04 33.50 1.85 42.75 98.99 868.78 0.00 769.79
10 500mm 760.00 21.60 -4.45 3.24 43.30 798.85 35.80 2.15 46.55 108.76 954.16 0.00 845.40
11 600mm 1134.00 32.40 -6.67 4.25 56.80 1184.13 52.00 3.38 68.90 161.22 1414.25 0.00 1253.03
12 700mm 1447.00 43.20 -8.90 5.82 77.78 1515.88 65.80 4.77 89.65 206.39 1811.92 0.00 1605.53
13 800mm 1767.00 50.40 -10.38 7.93 105.98 1862.60 77.40 4.77 101.25 253.59 2217.44 0.00 1963.85
14 900mm 2214.00 68.00 -14.01 10.47 139.92 2339.91 88.90 4.77 112.75 318.58 2771.24 0.00 2452.66
15 1000mm 2690.00 80.00 -16.48 12.45 166.38 2839.90 131.70 9.83 180.85 386.65 3407.40 0.00 3020.75
16 1100mm 3207.00 96.00 -19.78 14.50 193.78 3381.00 144.40 9.83 193.55 460.32 4034.87 0.00 3574.55
17 1200mm 3818.00 112.00 -23.07 17.23 230.26 4025.19 164.00 10.46 216.30 548.03 4789.52 0.00 4241.49
18 1400mm 5196.00 140.00 -28.84 23.21 310.18 5477.34 197.50 10.46 249.80 745.74 6472.88 0.00 5727.14
19 1600mm 6007.00 168.00 -34.61 28.92 386.49 6358.88 228.70 10.46 281.00 865.76 7505.64 0.00 6639.88
20 1800mm 7883.00 216.00 -44.50 36.26 484.58 8323.08 263.30 10.46 315.60 1133.19 9771.87 0.00 8638.68
Basic Rate up
Rate for
Rate of Cement Variation Variation Actual to 5 Rate
Dia of MS rods every Add over
Pipe per required in in MS Rate of Kms Total lead Add VAT & excluding
S N Pipes in required additional 1 heads on Sub-total
Rmt per 1 Cement rods Pipe per Lead charges LC @ Over
mm per 1 Rmt KM lead or pipe cost
Rmt Cost Cost Rmt heads
part thereof
( Table-1) (Table-6)
P1 Wc R1 Ws R2 R1+R2 13.62% 0%
1 300mm 901.00 14.40 -2.97 2.58 34.48 932.51 45.00 1.24 51.20 126.96 1110.67 0.00 983.71
2 350mm 1122.00 25.20 -5.19 3.73 49.85 1166.66 48.50 1.39 55.45 158.84 1380.95 0.00 1222.11
3 400mm 1240.00 32.40 -6.67 4.08 54.53 1287.86 57.80 1.85 67.05 175.34 1530.25 0.00 1354.91
4 450mm 1419.00 39.60 -8.16 4.57 61.07 1471.91 62.40 2.15 73.15 200.40 1745.46 0.00 1545.06
5 500mm 1537.00 46.80 -9.64 5.60 74.84 1602.20 68.10 2.15 78.85 218.14 1899.19 0.00 1681.05
7 600mm 2306.00 57.60 -11.87 8.19 109.45 2403.58 102.80 4.77 126.65 327.25 2857.48 0.00 2530.23
9 700mm 2849.00 75.60 -15.57 11.45 153.02 2986.45 114.30 5.54 142.00 406.61 3535.06 0.00 3128.45
10 800mm 3754.00 97.20 -20.02 15.70 209.81 3943.79 137.40 5.54 165.10 536.95 4645.84 0.00 4108.89
11 900mm 4698.00 124.00 -25.54 20.96 280.11 4952.57 180.20 10.46 232.50 674.29 5859.36 0.00 5185.07
12 1000mm 5856.00 160.00 -32.96 24.18 323.14 6146.18 217.10 10.46 269.40 836.80 7252.38 0.00 6415.58
13 1100mm 6875.00 184.00 -37.90 30.25 404.26 7241.36 235.60 11.38 292.50 985.91 8519.77 0.00 7533.86
14 1200mm 8084.00 208.00 -42.85 37.12 496.07 8537.22 263.30 11.38 320.20 1162.34 10019.76 0.00 8857.42
15 1400mm 10428.00 272.00 -56.03 49.76 664.99 11036.96 358.10 11.84 417.30 1502.68 12956.94 0.00 11454.26
16 1600mm 13465.00 364.00 -74.98 68.95 921.45 14311.47 429.70 11.84 488.90 1948.51 16748.88 0.00 14800.37
17 1800mm 17778.00 448.00 -92.29 96.46 1289.09 18974.80 572.90 16.61 655.95 2583.42 22214.17 0.00 19630.75
Basic Rate up
Rate for
Rate of Cement Variation Variation Actual to 5 Rate
Dia of MS rods every Add over
Pipe per required in in MS Rate of Kms Total lead Add VAT & excluding
S N Pipes in required additional 1 heads on Sub-total
Rmt per 1 Cement rods Pipe per Lead charges LC @ Over
mm per 1 Rmt KM lead or pipe cost
Rmt Cost Cost Rmt heads
part thereof
( Table-1) (Table-6)
P1 Wc R1 Ws R2 R1+R2 86576.15% 0%
1 300mm 915.00 10.80 -2.22 2.53 33.81 946.59 45.00 1.24 51.20 128.88 1126.67 0.00 997.79
2 350mm 1141.00 14.40 -2.97 3.15 42.10 1180.13 48.50 1.39 55.45 160.67 1396.25 0.00 1235.58
3 400mm 1265.00 14.40 -2.97 3.83 51.18 1313.21 57.80 1.85 67.05 178.79 1559.05 0.00 1380.26
4 450mm 1434.00 18.00 -3.71 4.64 62.01 1492.30 62.40 2.15 73.15 203.18 1768.63 0.00 1565.45
5 500mm 1757.00 21.60 -4.45 5.50 73.50 1826.05 68.10 2.15 78.85 248.62 2153.52 0.00 1904.90
7 600mm 2704.00 28.80 -5.93 7.97 106.51 2804.58 102.80 4.77 126.65 381.84 3313.07 0.00 2931.23
9 700mm 3595.00 32.40 -6.67 10.37 138.58 3726.91 114.30 5.54 142.00 507.42 4376.33 0.00 3868.91
10 800mm 4678.00 43.20 -8.90 13.16 175.87 4844.97 137.40 5.54 165.10 659.64 5669.71 0.00 5010.07
11 900mm 5823.00 60.00 -12.36 16.34 218.37 6029.01 180.20 10.46 232.50 820.85 7082.36 0.00 6261.51
12 1000mm 7954.00 72.00 -14.83 20.40 272.63 8211.80 217.10 10.46 269.40 1118.04 9599.24 0.00 8481.20
13 1100mm 9193.00 88.00 -18.13 24.64 329.29 9504.16 235.60 11.38 292.50 1293.99 11090.65 0.00 9796.66
14 1200mm 10735.00 104.00 -21.42 28.58 381.94 11095.52 263.30 11.38 320.20 1510.66 12926.38 0.00 11415.72
15 1400mm 14789.00 0.00 0.00 0.00 0.00 14789.00 358.10 11.84 417.30 2013.52 17219.82 0.00 15206.30
16 1600mm 17647.00 0.00 0.00 0.00 0.00 17647.00 429.70 11.84 488.90 2402.64 20538.54 0.00 18135.90
17 1800mm 23573.00 0.00 0.00 0.00 0.00 23573.00 572.90 16.61 655.95 3209.46 27438.41 0.00 24228.95
3
Manufacture,supply and delivery of RCC Collars confirming to B.I.S. 458/ 2003 (RATE PER EACH
COLLAR ) suitable for RCC Plain Ended Pipes including Transportation,Central Excice Duty, Sales Tax but
Excluding VAT etc.complete.
20 1800mm 2079.00 6.80 -0.001 9.67 0.129 2079.13 283.07 0.00 0.00 2079.13
4 Manufacture,supply and delivery of RCC Collars confirming to B.I.S. 458/ 2003 (RATE PER EACH
COLLAR ) suitable for RCC Plain Ended Pipes including Transportation,Central Excice Duty, Sales Tax but
Excluding VAT etc.complete. ( for NP 3 pipes )
Collars for NP3 Pipes 9/1/2018
2* ∏ 360 up to 800
6.286 400 above 800
NP 2 Class PE Pipes Collars for NP 2 Class PE Pipes
1 0.10 0.025 0.06 0.01 3.60 0.77 0.10 0.13 0.15 0.025 0.72 0.15
2 0.15 0.025 0.09 0.01 3.60 0.83 0.15 0.18 0.15 0.025 0.72 0.16
3 0.20 0.025 0.11 0.02 7.20 0.97 0.20 0.23 0.15 0.025 0.72 0.18
4 0.225 0.025 0.13 0.02 7.20 1.05 0.225 0.25 0.15 0.025 0.72 0.20
5 0.25 0.025 0.14 0.02 7.20 1.17 0.25 0.28 0.15 0.025 0.72 0.22
6 0.30 0.030 0.17 0.03 10.80 1.57 0.30 0.33 0.15 0.03 1.08 0.24
7 0.35 0.032 0.19 0.04 14.40 1.91 0.35 0.38 0.15 0.032 1.08 0.33
8 0.40 0.032 0.22 0.04 14.40 2.27 0.40 0.43 0.15 0.032 1.08 0.36
9 0.45 0.035 0.24 0.05 18.00 2.75 0.45 0.488 0.20 0.035 1.80 0.38
10 0.50 0.035 0.27 0.06 21.60 3.24 0.50 0.538 0.20 0.035 1.80 0.55
11 0.60 0.045 0.32 0.09 32.40 4.25 0.60 0.638 0.20 0.04 2.16 0.75
12 0.70 0.05 0.38 0.12 43.20 5.82 0.70 0.738 0.20 0.04 2.16 1.28
13 0.80 0.05 0.43 0.14 50.40 7.93 0.80 0.838 0.20 0.045 2.52 2.08
14 0.90 0.055 0.48 0.17 68.00 10.47 0.90 0.938 0.20 0.05 3.20 2.28
15 1.00 0.06 0.53 0.2 80.00 12.45 1.00 1.038 0.20 0.055 3.60 2.58
16 1.10 0.065 0.58 0.24 96.00 14.50 1.10 1.138 0.20 0.06 4.00 3.72
17 1.20 0.07 0.64 0.28 112.00 17.23 1.20 1.238 0.20 0.065 4.40 4.44
18 1.40 0.075 0.74 0.35 140.00 23.21 1.40 1.438 0.20 0.075 5.20 5.58
19 1.60 0.08 0.84 0.42 168.00 28.92 1.60 1.638 0.20 0.08 5.60 7.22
20 1.80 0.09 0.95 0.54 216.00 36.26 1.80 1.838 0.20 0.09 6.80 9.67
21 2.00 0.10 1.05 0.66 264.00 50.42 2.00 2.038 0.20 0.10 7.60 13.15
22 2.20 0.11 1.16 0.80 320.00 61.65 2.20 2.238 0.20 0.11 8.80 14.30
Vide Page No.7 of IS 458.2003 IS 458 -2003 Pg.28
2* ∏ 360 up to 800
6.286 400 above 800
NP 3 Class Pipes Collars for NP 3 Class PE Pipes
1 0.30 0.04 0.17 0.04 14.40 2.58 0.30 0.33 0.15 0.03 1.08 0.33
2 0.35 0.055 0.20 0.07 25.20 3.73 0.35 0.39 0.15 0.035 1.08 0.36
3 0.40 0.06 0.23 0.09 32.40 4.08 0.40 0.44 0.20 0.035 1.80 0.38
4 0.45 0.065 0.26 0.11 39.60 4.57 0.45 0.49 0.20 0.035 1.80 0.55
5 0.50 0.07 0.29 0.13 46.80 5.60 0.50 0.54 0.20 0.04 2.16 0.75
6 0.60 0.075 0.34 0.16 57.60 8.19 0.60 0.64 0.20 0.04 2.16 1.28
7 0.70 0.085 0.39 0.21 75.60 11.45 0.70 0.74 0.20 0.045 2.52 2.08
8 0.80 0.095 0.45 0.27 97.20 15.70 0.80 0.84 0.20 0.05 3.20 2.28
9 0.90 0.10 0.50 0.31 124.00 20.96 0.90 0.94 0.20 0.055 3.60 2.58
10 1.00 0.115 0.56 0.4 160.00 24.18 1.00 1.04 0.20 0.06 4.00 3.72
11 1.10 0.12 0.61 0.46 184.00 30.25 1.10 1.14 0.20 0.065 4.40 4.44
12 1.20 0.125 0.66 0.52 208.00 37.12 1.20 1.24 0.20 0.075 5.20 5.58
13 1.40 0.14 0.77 0.68 272.00 49.76 1.40 1.44 0.20 0.08 5.60 7.22
14 1.60 0.165 0.88 0.91 364.00 68.95 1.60 1.64 0.20 0.09 6.80 9.67
15 1.80 0.18 0.99 1.12 448.00 96.46 1.80 1.84 0.20 0.10 7.60 13.15
16 2.00 0.19 1.1 1.31 524.00 107.26 2.00 2.04 0.20 0.11 8.80 14.30
17 2.20 0.21 1.21 1.6 640.00 142.66
18 2.40 0.225 1.31 1.85 740.00 190.64
Vide Page No.8 of IS 458.2003 Vide Page No.8 of IS 458.1988 - Note.2
2* ∏ 360 up to 800
6.286 400 above 800
NP 4 Class Pipes Collars for NP 4 Class PE Pipes
1 0.30 0.03 0.17 0.03 10.80 2.53 0.30 0.33 0.15 0.03 1.08 0.33
2 0.35 0.032 0.19 0.04 14.40 3.15 0.35 0.39 0.15 0.035 1.08 0.36
3 0.40 0.032 0.22 0.04 14.40 3.83 0.40 0.44 0.20 0.035 1.80 0.38
4 0.45 0.035 0.24 0.05 18.00 4.64 0.45 0.49 0.20 0.035 1.80 0.55
5 0.50 0.035 0.27 0.06 21.60 5.50 0.50 0.54 0.20 0.04 2.16 0.75
6 0.60 0.04 0.32 0.08 28.80 7.97 0.60 0.64 0.20 0.04 2.16 1.28
7 0.70 0.04 0.37 0.09 32.40 10.37 0.70 0.74 0.20 0.045 2.52 2.08
8 0.80 0.045 0.42 0.12 43.20 13.16 0.80 0.84 0.20 0.05 3.20 2.28
9 0.90 0.05 0.48 0.15 60.00 16.34 0.90 0.94 0.20 0.055 3.60 2.58
10 1.00 0.055 0.53 0.18 72.00 20.40 1.00 1.04 0.20 0.06 4.00 3.72
11 1.10 0.06 0.58 0.22 88.00 24.64 1.10 1.14 0.20 0.065 4.40 4.44
12 1.20 0.065 0.63 0.26 104.00 28.58 1.20 1.24 0.20 0.075 5.20 5.58
13 1.40 1.40 1.44 0.20 0.08 5.60 7.22
14 1.60 1.60 1.64 0.20 0.09 6.80 9.67
15 1.80 1.80 1.84 0.20 0.10 7.60 13.15
16 2.00 2.00 2.04 0.20 0.11 8.80 14.30
17 2.20
18 2.40
Vide Page No.9 of IS 458.2003 Vide Page No.8 of IS 458.1988 - Note.2
Rate
including
Over heads
203.66
245.12
295.28
320.09
342.43
489.34
616.94
709.48
868.78
954.16
1414.25
1811.92
2217.44
2771.24
3407.40
4034.87
4789.52
6472.88
7505.64
9771.87
Rate
including
Over heads
1110.67
1380.95
1530.25
1745.46
1899.19
2857.48
3535.06
4645.84
5859.36
7252.38
8519.77
10019.76
12956.94
16748.88
22214.17
Rate
including
Over heads
1126.67
1396.25
1559.05
1768.63
2153.52
3313.07
4376.33
5669.71
7082.36
9599.24
11090.65
12926.38
CIVIL ITEMS
Sl. No. ITEM CODE DESCRIPTION OF THE ITEM
A SECTION BRICKS & BUILDING BLOCKS
I SUB-SECTION ORDINARY CLAY BRICKS
1 TBSC-A.I-01 Common burnt clay bricks of class as per Table -1 of IS: 1077-1992 Non-Modular or
traditional size 23 x 11 x 7 cm (ex-quarry price - excluding cost of conveyance, loading
& unloading)
2 TBSC-A.I-02 Common burnt clay bricks of class as per Table -1 of IS: 1077-1992 Modular or
traditional size 19 x 9 x 9 cm (ex-quarry price - excluding cost of conveyance, loading
& unloading)
II SUB-SECTION FLY-ASH CEMENT / LIME SOLID BLOCKS
3 TBSC-A.II-01 Fly ash cement / lime solid blocks with compressive strength of 75 kg/sq.cm -
IS:12894-1990 - CLASS - 7.5 (ex-quarry price - excluding cost of conveyance, loading
& unloading) 290 x 225 x 140 mm
4 TBSC-A.II-02 Fly ash cement / lime solid blocks with compressive strength of 75 kg/sq.cm -
IS:12894-1990 - CLASS - 7.5 (ex-quarry price - excluding cost of conveyance, loading
& unloading) 290 x 200 x 140 mm
5 TBSC-A.II-03 Fly ash cement / lime solid blocks with compressive strength of 75 kg/sq.cm -
IS:12894-1990 - CLASS - 7.5 (ex-quarry price - excluding cost of conveyance, loading
& unloading) 290 x 150 x 140 mm
6 TBSC-A.II-04 Fly ash cement / lime solid blocks with compressive strength of 75 kg/sq.cm -
IS:12894-1990 - CLASS - 7.5 (ex-quarry price - excluding cost of conveyance, loading
& unloading) 290 x 112 / 100 x 140 mm
7 TBSC-A.II-05 Fly ash cement / lime solid blocks with compressive strength of 75 kg/sq.cm -
IS:12894-1990 - CLASS - 7.5 (ex-quarry price - excluding cost of conveyance, loading
& unloading) 225 x 100 x 60 mm
8 TBSC-A.II-06 Fly ash cement / lime solid blocks with compressive strength of 75 kg/sq.cm -
IS:12894-1990 - CLASS - 7.5 (ex-quarry price - excluding cost of conveyance, loading
& unloading) 145 x 225 x 140 mm
9 TBSC-A.II-07 Fly ash cement / lime solid blocks with compressive strength of 75 kg/sq.cm -
IS:12894-1990 - CLASS - 7.5 (ex-quarry price - excluding cost of conveyance, loading
& unloading) 145 x 200 x 140 mm
10 TBSC-A.II-08 Fly ash cement / lime solid blocks with compressive strength of 50 kg/sq.cm -
IS:12894-1990 - CLASS - 5 (ex-quarry price - excluding cost of conveyance, loading &
unloading) 290 x 225 x 140 mm
11 TBSC-A.II-09 Fly ash cement / lime solid blocks with compressive strength of 50 kg/sq.cm -
IS:12894-1990 - CLASS - 5 (ex-quarry price - excluding cost of conveyance, loading &
unloading) 290 x 200 x 140 mm
12 TBSC-A.II-10 Fly ash cement / lime solid blocks with compressive strength of 50 kg/sq.cm -
IS:12894-1990 - CLASS - 5 (ex-quarry price - excluding cost of conveyance, loading &
unloading) 290 x 150 x 140 mm
13 TBSC-A.II-11 Fly ash cement / lime solid blocks with compressive strength of 50 kg/sq.cm -
IS:12894-1990 - CLASS - 5 (ex-quarry price - excluding cost of conveyance, loading &
unloading) 290 x 112/100 x 140 mm
14 TBSC-A.II-12 Fly ash cement / lime solid blocks with compressive strength of 50 kg/sq.cm -
IS:12894-1990 - CLASS - 5 (ex-quarry price - excluding cost of conveyance, loading &
unloading) 225 x 100 x 60 mm
15 TBSC-A.II-13 Fly ash cement / lime solid blocks with compressive strength of 50 kg/sq.cm -
IS:12894-1990 - CLASS - 5 (ex-quarry price - excluding cost of conveyance, loading &
unloading) 145 x 225 x 140 mm
16 TBSC-A.II-14 Fly ash cement / lime solid blocks with compressive strength of 50 kg/sq.cm -
IS:12894-1990 - CLASS - 5 (ex-quarry price - excluding cost of conveyance, loading &
unloading) 145 x 200 x 140 mm
III SUB-SECTION AUTOCLAVED CONCRETE BLOCKS
17 TBSC-A.III-01 Supply of Aerated (Cellular) Autoclaved Concrete Blocks conforming to IS:2185
(Part-3) - 1984 and IS:6441-1972 of Compressive strength 3 N/mm2 (landing cost of
conveyance, loading & unloading) of Aerocon / Airolite or equivalent products 600 x
200 x 100 mm
18 TBSC-A.III-02 Supply of Aerated (Cellular) Autoclaved Concrete Blocks conforming to IS:2185
(Part-3) - 1984 and IS:6441-1972 of Compressive strength 3 N/mm2 (landing cost of
conveyance, loading & unloading) of Aerocon / Airolite or equivalent products 600 x
200 x 150 mm
19 TBSC-A.III-03 Supply of Aerated (Cellular) Autoclaved Concrete Blocks conforming to IS:2185
(Part-3) - 1984 and IS:6441-1972 of Compressive strength 3 N/mm2 (landing cost of
conveyance, loading & unloading) of Aerocon / Airolite or equivalent products 600 x
200 x 200 mm
20 TBSC-A.III-04 Supply of Aerated (Cellular) Autoclaved Concrete Blocks conforming to IS:2185
(Part-3) - 1984 and IS:6441-1972 of Compressive strength 3 N/mm2 (landing cost of
conveyance, loading & unloading) of Aerocon / Airolite or equivalent products 600 x
200 x 230 mm
43 TBSC-C.II-02 Supply of soluble salt porcelain vitrified tiles screen printed and polised of size 600 x
600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711,
IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades and designs
44 TBSC-C.II-03 Supply of Nano polished / stain free soluble salt porcelain vitrified tiles screen printed
and polised of size 600 x 600 mm and thickness between 8-10 mm 1st quality
conforming to IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in
all shades and designs
45 TBSC-C.II-04 Supply of Nano polished soluble salt porcelain vitrified tiles screen printed and polised
of size 800 x 800 mm and thickness between 9-11 mm 1st quality conforming to
IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades
and designs
46 TBSC-C.II-05 Supply of Double charged / multi charged stain free full body porcelain vitrified tiles
with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1st
quality conforming to IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and
finish in all shades and designs
47 TBSC-C.II-06 Supply of Double charged / multi charged stain free full body porcelain vitrified tiles
with double layer pigment of size 800 x 800 mm and thickness between 9-11 mm 1st
quality conforming to IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and
finish in all shades and designs
48 TBSC-C.II-07 Supply of Double charged / multi charged stain free full body porcelain vitrified tiles
with double layer pigment of size 1000 x 1000 mm and thickness between 12-15 mm
1st quality conforming to IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour
and finish in all shades and designs
49 TBSC-C.II-08 Supply of digital / polished glazed full body porcelain vitrified tiles with any type of
design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch
less, stain free and of size 800 x 800 mm and thickness between 9-11 mm 1st quality
conforming to IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in
all shades and designs
50 TBSC-C.II-09 Supply of digital / polished glazed full body porcelain vitrified tiles with any type of
design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch
less, stain free and of size 900 x 900 mm and thickness between 9-11 mm 1st quality
conforming to IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in
all shades and designs
51 TBSC-C.II-10 Supply of digital / polished glazed full body porcelain vitrified tiles with any type of
design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch
less, stain free and of size 1000 x 1000 mm and thickness between 12-15 mm 1st
quality conforming to IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and
finish in all shades and designs
52 TBSC-C.II-11 Supply of digital / polished glazed full body porcelain vitrified tiles with any type of
design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch
less, stain free and of size 1200 x 600 mm and thickness between 12-15 mm 1st
quality conforming to IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and
finish in all shades and designs
53 TBSC-C.II-12 Supply of full body heavy duty industrial variety porcelain vitrified tiles of size 300 x
300 / 200 x 100 mm and thickness between 10-12 mm 1st quality conforming to
IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades
and designs
54 TBSC-C.II-13 Supply of full body heavy duty industrial variety / tact porcelain vitrified tiles of size 300
x 300 / 200 x 100 mm and thickness between 12-15 mm 1st quality conforming to
IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades
and designs
55 TBSC-C.II-14 Supply of full body heavy duty industrial variety porcelain vitrified tiles of size 300 x
300 / 200 x 100 mm and thickness between 18-20 mm 1st quality conforming to
IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades
and designs
56 TBSC-C.II-15 Supply of full body heavy duty industrial variety porcelain vitrified tiles of size 400 x
400 mm and thickness between 10-12 mm 1st quality conforming to IS:13711,
IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades and designs
57 TBSC-C.II-16 Supply of full body heavy duty industrial variety porcelain vitrified tiles of size 600 x
600 mm and thickness between 10-12 mm 1st quality conforming to IS:13711,
IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades and designs
59 TBSC-C.III-02 Supply of glazed red or white full body ceramic wall tiles of size 300 x 450 / 320 x 400
mm and thickness between 6 mm 1st quality conforming to IS:13711, IS:13712, IS:
13630 (Parts 1 to 15) of any colour and finish in all shades and designs
60 TBSC-C.III-03 Supply of glazed red or white full body ceramic wall tiles of size 300 x 600 mm and
thickness between 6-8 mm 1st quality conforming to IS:13711, IS:13712, IS: 13630
(Parts 1 to 15) of any colour and finish in all shades and designs
IV SUB-SECTION PORCELAIN WALL TILES
61 TBSC-C.IV-01 Supply of glazed full body porcelain wall tiles of size 300 x 600 mm with any type of
design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch
less, stain free and thickness between 6-8 mm 1st quality conforming to IS:13711,
IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades and designs
62 TBSC-C.IV-02 Supply of digital / polished glazed full body porcelain wall tiles of size 300 x 600 mm
with any type of design texture such as marble finish, wooden, bamboo, stone finishes
etc., scratch less, stain free and thickness between 6-8 mm 1st quality conforming to
IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades
and designs
63 TBSC-C.IV-03 Supply of digital / polished glazed full body porcelain highliter wall tiles of size 300 x
600 mm with any type of design texture such as marble finish, wooden, bamboo,
stone finishes etc., scratch less, stain free and thickness between 6-8 mm 1st quality
conforming to IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in
all shades and designs
64 TBSC-C.IV-04 Supply of screen printed glazed full body porcelain wall tiles of size 300 x 600 mm with
any type of design texture such as marble finish, wooden, bamboo, stone finishes etc.,
scratch less, stain free and thickness between 6-8 mm 1st quality conforming to
IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades
and designs
65 TBSC-C.IV-05 Supply of glazed full body porcelain wall tiles of size 400 x 600 mm with any type of
design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch
less, stain free and thickness between 6-8 mm 1st quality conforming to IS:13711,
IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades and designs
66 TBSC-C.IV-06 Supply of glazed full body porcelain wall tiles of size 600 x 800 mm with any type of
design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch
less, stain free and thickness between 7-9 mm 1st quality conforming to IS:13711,
IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades and designs
67 TBSC-C.IV-07 Supply of glazed full body porcelain premium plain design highliter combination floor
and wall tiles set with floor tiles of thickness 14-16 mm of thickness 8-10 mm but
excluding highlighters 1st quality conforming to IS:13711, IS:13712, IS: 13630 (Parts 1
to 15) of any colour and finish in all shades and designs
68 TBSC-C.IV-08 Supply of glazed full body porcelain premium plain design highliter combination floor
and wall tiles set with floor tiles of thickness 14-16 mm of thickness 8-10 mm but
including highlighters 1st quality conforming to IS:13711, IS:13712, IS: 13630 (Parts 1
to 15) of any colour and finish in all shades and designs
69 TBSC-C.IV-09 Providing and fixing wall dado with epoxy emulsion grout / synthetic / resin based
adhesive in specified thick and pointing with specified colour epoxy grout excluding
cost of tiles
70 TBSC-C.IV-10 Providing and fixing wall dado with cement based adhesive in specified thick and
pointing with specified colour epoxy grout excluding cost of tiles
71 TBSC-C.IV-11 Providing and fixing flooring with full depth jointing and pointing to the Vitrified/
Ceramic Tile flooring in specified thick for tiles of any sizes with epoxy emulsion grout/
synthetic/ resin adhesive in width of 3-5 mm with Nylon spacers excluding cost of tiles
72 TBSC-C.IV-12 Providing and fixing flooring with full depth jointing and pointing to the Vitrified/
Ceramic Tile flooring in specified thick for tiles of any sizes with cement based
adhesive in width of 3-5 mm with Nylon spacers excluding cost of tiles
73 TBSC-C.IV-13 Providing and fixing flooring with full depth jointing and pointing to the Marble / Granite
flooring for any sizes with epoxy emulsion grout/ synthetic/ resin adhesive in width of
3-5 mm excluding cost of tiles
74 TBSC-C.IV-14 Providing and fixing flooring with full depth jointing and pointing to the Marble / Granite
flooring for any sizes with cement based adhesive in width of 3-5 mm excluding cost of
tiles
V SUB-SECTION GLASS MOSAIC TILES
75 TBSC-C.V-01 Supply of glazed full body glass mosaic tiles of 20 x 20 x 4 mm thick in specified
pattern 1st Quality of any colour and design
76 TBSC-C.V-02 Providing Glass Mosaic tiles using specified pattern fixing in specified thick epoxy
emulsion grout of epoxy resins and filler powder of approved colour grout including all
taxes excluding cost of tiles
77 TBSC-C.V-03 Providing Glass Mosaic tiles using specified pattern fixing in specified thick
cementitious powder mix cement grout and approved colour grout including all taxes
excluding cost of tiles
VI SUB-SECTION WALL CLADDING TILES
78 TBSC-C.VI-01 Supply of glazed full body porcelain tiles for external cladding purposes of any size
and thickness between 6-10 mm 1st quality conforming to IS:13711, IS:13712, IS:
13630 (Parts 1 to 15) of any colour and finish in all shades and designs
79 TBSC-C.VI-02 Supply of glazed red or white full body ceramic tiles for external cladding purposes of
any size and thickness between 5-7 mm 1st quality conforming to IS:13711, IS:13712,
IS: 13630 (Parts 1 to 15) of any colour and finish in all shades and designs
80 TBSC-C.VI-03 Supply of glazed red or white full body ceramic tiles for external cladding purposes of
any size and thickness between 10-12 mm 1st quality conforming to IS:13711,
IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades and designs
81 TBSC-C.VI-04 Supply of glazed red or white full body ceramic tiles for external cladding purposes of
any size and thickness between 18-20 mm 1st quality conforming to IS:13711,
IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades and designs
83 TBSC-C.VII-02 Supplying precast terrazzo plain tiles conforming to IS:13801 using marble aggregates
of size 10mm, sand, marble powder, white cement pigments etc., with terrazzo topping
not less than 6 mm of tiles overall size not less than 20 mm thick any coloured
shades.
84 TBSC-C.VII-03 Supplying precast terrazzo chequered tiles conforming to IS:13801 using marble
aggregates of size 10mm, sand, marble powder, white cement pigments etc., with
terrazzo topping not less than 6 mm of tiles overall size not less than 20 mm thick any
coloured shades.
VIII SUB-SECTION CEMENT CONCRETE FLOOR TILES (PLAIN & CHEQURED)
85 TBSC-C.VIII-01 Supplying Plain Cement Concrete general purpose tiles conforming to IS: 13801 using
aggregates, cement, pigments of size 300 x 300 mm and thickness 20 mm of any
shades
86 TBSC-C.VIII-02 Supplying Chequered Cement Concrete general purpose tiles conforming to IS: 13801
using aggregates, cement, pigments of size 300 x 300 mm and thickness 20 mm of
any shades
87 TBSC-C.VIII-03 Supplying Plain Cement Concrete general purpose tiles conforming to IS: 13801 using
aggregates, cement, pigments of size 300 x 300 mm and thickness 25 mm of any
shades
88 TBSC-C.VIII-04 Supplying Chequered Cement Concrete general purpose tiles conforming to IS: 13801
using aggregates, cement, pigments of size 300 x 300 mm and thickness 25 mm of
any shades
89 TBSC-C.VIII-05 Supplying Plain Cement Concrete general purpose tiles conforming to IS: 13801 using
aggregates, cement, pigments of size 400 x 400 mm and thickness 25 mm of any
shades
90 TBSC-C.VIII-06 Supplying Chequered Cement Concrete general purpose tiles conforming to IS: 13801
using aggregates, cement, pigments of size 400 x 400 mm and thickness 25 mm of
any shades
91 TBSC-C.VIII-07 Supply of high strength Cement Concrete Plain Step tiles with edge half rounded and
grooved conforming to IS:13801 using aggregates, cement, pigments of regular
colour, design and of 25 mm thickness
92 TBSC-C.VIII-08 Supply of high strength Cement Concrete terrazzo/pre-polished/ chequered Step tiles
with edge rounded and grooved conforming to IS:13801 using aggregates, cement,
pigments of regular colour, design and of 25 mm thickness
IX SUB-SECTION PRE-CAST CONCRETE BLOCK FOR PAVING
93 TBSC-C.IX-01 Suppply of precast concrete blocks for paving of M-30 grade and thickness not less
than 50 mm for Non-traffic areas conforming to IS 15658:2006 in all shapes and
designs as per the manufacturer's Specification
94 TBSC-C.IX-02 Suppply of precast concrete blocks for paving of M-35 grade and thickness not less
than 60 mm for Light traffic areas conforming to IS 15658:2006 in all shapes and
designs as per the manufacturer's Specification
95 TBSC-C.IX-03 Suppply of precast concrete blocks for paving of M-40 grade and thickness not less
than 80 mm for Medium traffic areas conforming to IS 15658:2006 in all shapes and
designs as per the manufacturer's Specification
96 TBSC-C.IX-04 Suppply of precast concrete blocks for paving of M-50 grade and thickness not less
than 100 mm for Heavy traffic areas conforming to IS 15658:2006 in all shapes and
designs as per the manufacturer's Specification
97 TBSC-C.IX-05 Suppply of precast concrete blocks for paving of M-55 grade and thickness not less
than 120 mm for Very Heavy traffic areas conforming to IS 15658:2006 in all shapes
and designs as per the manufacturer's Specification
98 TBSC-C.IX-06 Labour Charges for laying & fixing of precast concrete blocks for paving of all grades,
any thickness, all sizes & shapes including all labour charges for loading & unloading,
laying to desired lines and levels complete excluding cost of cement, sand, water,
electricity etc
X SUB-SECTION VINYL FLOORING
99 TBSC-C.X-01 Vinyl Flooring Sheets/ Tiles having a nominal total thickness of 2 mm with a wearing
surface impregnated polyurethane homogeneous mixture of PVC, Plasticizers,
Urethane, colour pigments with wearing resistance and Fire Resistance as per
standards
100 TBSC-C.X-02 Vinyl Composition Floor Tiles of size 305 x 305 mm having an overall thickness of 2
mm with a wearing surface impregnated polyurethane homogeneous mixture of PVC,
Plasticizers, Urethane, colour pigments with wearing resistance and Fire Resistance
as per standards
101 TBSC-C.X-03 Vinyl Flooring Sheets/ Tiles having a nominal total thickness of 1.5 mm with a wearing
surface impregnated polyurethane homogeneous mixture of PVC, Plasticizers,
Urethane, colour pigments with wearing resistance and Fire Resistance as per
standards
138 TBSC-E.I.02 Supplying & fixing collapsible steel shutters with vertical, double channel of 20 x10x2
mm of 100 mm centre ,Bracers with flat iron 40x40x6 mm with 38 mm dia steel
pulleys, the top, bottom and side vertical frames of the collapsible gate with
65x65mmx8mm MS Angle and middle guide rail at site height with 65mmx8mm MS
flat for the pulleys to guide and fixed with necessary hold fasts, bolts, nuts, rivets,
locking arrangements, stoppers, handles, all accessories all fixtures and painted
with one coat of approved steel primer etc., complete for finished item of work as
per special spn 1105
139 TBSC-E.I.03 Expanded metal sheets as per IS-412-1962- Light Weight-25 mm (SWM) x 75 mm
(LWM) 3.25 mm Wide and 1.25 mm thick
140 TBSC-E.I.04 Expanded metal sheets as per IS-412-1962- Light Weight-20 mm(SWM)x60
mm(LWM) 2.50 mm Wide and 1.25 mm thick
141 TBSC-E.I.05 Expanded metal sheets as per IS-412-1962- Light Weight-20 mm(SWM)x50
mm(LWM) 2.50 mm Wide and 1.25 mm thick
142 TBSC-E.I.06 Expanded metal sheets as per IS-412-1962- Medium Weight-25 mm(SWM)x75
mm(LWM) 3.25 mm Wide and 1.60 mm thick
143 TBSC-E.I.07 Expanded metal sheets as per IS-412-1962- Medium Weight-20 mm(SWM)x60
mm(LWM) 2.50 mm Wide and 1.60 mm thick
144 TBSC-E.I.08 Expanded metal sheets as per IS-412-1962- Medium Weight-20 mm(SWM)x50
mm(LWM) 2.50 mm Wide and 1.60 mm thick
145 TBSC-E.I.09 Expanded metal sheets as per IS-412-1962- Heavy Weight-25 mm(SWM)x75
mm(LWM) 3.25 mm Wide and 2.24 mm thick
146 TBSC-E.I.10 Expanded metal sheets as per IS-412-1962- Heavy Weight-20 mm(SWM)x60
mm(LWM) 2.50 mm Wide and 2.24 mm thick
147 TBSC-E.I.11 Expanded metal sheets as per IS-412-1962- Heavy Weight-20 mm(SWM)x50
mm(LWM) 2.50 mm Wide and 2.24 mm thick
148 TBSC-E.I.12 Rabbit wire mesh (chicken mesh) of not less than 30 gauge
149 TBSC-E.I.13 Country Nails
150 TBSC-E.I.14 Wire Nails
151 TBSC-E.I.15 Mild Steel Tubes & pipes of all diameters as per IS-1161
II SUB-SECTION GALVANIZED STEEL MATERIAL
152 TBSC-E.II.01 Supplying Galvanized Steel Barbed wire conforming to IS 278 - 1978 : Type A - IOWA
Type Designation as per standard specification
153 TBSC-E.II.02 Supplying Galvanized Steel Barbed wire conforming to IS 278 - 1978 : Type B - IOWA
Type Designation as per standard specification
154 TBSC-E.II.03 Galvanized Iron fly proof wire mesh of not less than 20 gauge
155 TBSC-E.II.04 Hot dipped Galvanised Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-
1979: 2"x2" (50 mm x 50 mm) - 8 Gauge
156 TBSC-E.II.05 Hot dipped Galvanised Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-
1979: 2½"x2½" (63 mm x 63 mm) - 8 Gauge
157 TBSC-E.II.06 Hot dipped Galvanised Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-
1979: 3"x3" (76 mm x 76 mm) - 8 Gauge
158 TBSC-E.II.07 Hot dipped Galvanised Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-
1979: 4"x4" (102 mm x 102 mm) - 8 Gauge
159 TBSC-E.II.08 Hot dipped Galvanised Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979
- PVC Coated - 2"x2" (50 mm x 50 mm) - 8 Gauge
160 TBSC-E.II.09 Hot dipped Galvanised Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979
- PVC Coated - 2½"x2½" (63 mm x 63 mm) - 8 Gauge
161 TBSC-E.II.10 Hot dipped Galvanised Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979
- PVC Coated - 3"x3" (76 mm x 76 mm) - 8 Gauge
162 TBSC-E.II.11 Hot dipped Galvanised Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979
- PVC Coated - 4"x4" (102 mm x 102 mm) - 8 Gauge
III SUB-SECTION STAINLESS STEEL MATERIAL
163 TBSC-E.III.01 Stainless Steel Tubes, sections, plates, sheets & pipes of all sizes & diameters for -
304 Grade
164 TBSC-E.III.02 Stainless steel fly proof wire mesh of not less than 20 gauge
330 TBSC-J.III.02 5 Ply - 6 mm thick One side Teak Veneer Decorated Plywood conforming to (IS:1328)
331 TBSC-J.III.03 5 Ply - 9 mm thick One side Teak Veneer Decorated Plywood conforming to (IS:1328)
332 TBSC-J.III.04 9 Ply - 13 mm thick One side Teak Veneer Decorated Plywood conforming to (IS:1328)
333 TBSC-J.III.05 5 Ply - 9 mm thick Both sides Teak Veneer Decorated Plywood conforming to
(IS:1328)
334 TBSC-J.III.06 9 Ply - 12 mm thick Both sides Teak Veneer Decorated Plywood conforming to
(IS:1328)
IV SUB-SECTION LAMINATES
335 TBSC-J.IV.01 Melamine Laminate Sheets - Glossy Finish: 1.00 mm thick
336 TBSC-J.IV.02 Melamine Laminate Sheets - Glossy Finish: 1.50 mm thick
337 TBSC-J.IV.03 Melamine Laminate Sheets - Glossy Finish: 1.80 mm thick
338 TBSC-J.IV.04 Melamine Laminate Sheets - Mat Finish: 1.00 mm thick
339 TBSC-J.IV.05 Melamine Laminate Sheets - Mat Finish: 1.50 mm thick
340 TBSC-J.IV.06 Melamine Laminate Sheets - Mat Finish: 1.80 mm thick
V SUB-SECTION COMMERCIAL VENNERS
341 TBSC-J.V.01 Teak Veneer Lamination - 4 mm thick - Pencil Grains
342 TBSC-J.V.02 Teak Veneer Lamination - 4 mm thick - Natural Grains
K CEILINGS, WALL PARTITIONS & WALL LININGS
(Landing cost - including cost of conveyance, loading & unloading)
I SUB-SECTION FALSE CEILINGs - TILES / SHEETS
343 TBSC-K.I.01 Gypsum Board tiles of size notless than 0.595 M x 0.595 M of 12.5 mm thick as per IS
2095 -1992
344 TBSC-K.I.02 Gypsum Board tiles of size notless than 0.595 M x 0.595 M of 9 mm thick as per IS
2095 -1992
345 TBSC-K.I.03 Gypsum Board Plain sheet 12.5 mm thick as per IS 2095 -1993
346 TBSC-K.I.05 14 mm - Armstrong Mineral Fiber sheet 600 x 600 of beauty-Sky (Board / Tegular)
Edge tiles with a Humidity Resistance of 80% RH, Average NRC 0.50, Light
Reflectance >80%, Thermal Conductivity λ = 0.052 to 0.057 w/mk, Fire Performance
Class 0/Class 1
347 TBSC-K.I.06 15 mm - Armstrong Mineral Fiber sheet 600 x 600 of fissured-ANF (Board / Tegular)
Edge tiles with a Humidity Resistance of 90% RH, Average NRC 0.50, Light
Reflectance >80%, Thermal Conductivity λ = 0.052 to 0.057 w/mk, Fire Performance
Class 0/Class 1
348 TBSC-K.I.07 16 mm - Armstrong Tegular Edge 600 x 600 of MINATUFF (Board / Tegular/ Micro
look) Edge tiles with a Humidity Resistance of 99% RH, Average NRC 0.60, Light
Reflectance >88%, Thermal Conductivity λ = 0.052 to 0.057 w/mk, Fire
Performance Class 0/Class 1
349 TBSC-K.I.08 Designer ceiling Cement Boards -thickness 3.2 mm
350 TBSC-K.I.09 High pressure steam cured Cement Boards 4 mm thick
351 TBSC-K.I.10 High pressure steam cured Cement Boards 6 mm thick
352 TBSC-K.I.11 High pressure steam cured Cement Boards 8 mm thick
353 TBSC-K.I.12 High pressure steam cured Cement Boards 10 mm thick
354 TBSC-K.I.13 High pressure steam cured Cement Boards 12 mm thick
355 TBSC-K.I.14 High pressure steam cured Cement Boards 14 mm thick
356 TBSC-K.I.15 High pressure steam cured Cement Boards 16 mm thick
357 TBSC-K.I.16 High pressure steam cured Cement Boards 18 mm thick
358 TBSC-K.I.17 High pressure steam cured Cement Boards 20 mm thick
359 TBSC-K.I.18 High pressure steam cured designer Cement Boards 4 mm thick
360 TBSC-K.I.19 High pressure steam cured designer Cement Boards 6 mm thick
361 TBSC-K.I.20 Calcium Silicate Boards - 6mm thick
362 TBSC-K.I.21 Calcium Silicate Boards - 8mm thick
363 TBSC-K.I.22 Calcium Silicate Boards - 10mm thick
364 TBSC-K.I.23 Calcium Silicate Boards - 12mm thick
365 TBSC-K.I.24 Supply of Thermocole 12 mm thick sheets
366 TBSC-K.I.25 Supply of Thermocole 19 mm thick sheets
367 TBSC-K.I.26 Supplying and fixing of false ceiling using Plaster of paris Boards 12 mm thick with
standard GI ceiling angles, sections perimeter channels including cost and
conveyance of all materials and labour
368 TBSC-K.I.27 Supplying and fixing of false ceiling using Plaster of paris Boards 10 mm thick with
standard GI ceiling angles, sections perimeter channels including cost and
conveyance of all materials and labour charges etc complete
369 TBSC-K.I.28 Supply and fixing false ceiling using 8mm with thick Cement Bonded particle boards
conforming to (IS 14276) with galvanized and pre-painted steel T section of size
24mm x 38mm x 0.3mm for main T duty pre-punched to accept cross T section
of size 24mm x 30mm x 0.3mm duly punched at both ends for insertion into main
T. The grid size will be 610mm x 610mm. The frame work (grid) is suspended to the
roof by using G.I flat of 0.60mm or 14-gauge G.I wire with necessary fixers to the
roof and frame work. The cost is inclusive of necessary hardware, labor, one coat of
primer (Both side) and two coats of smooth finish on visible side.
370 TBSC-K.I.29 Providing and fixing false ceiling consisting of 600mmX600mm, Solid PVC insulation
panels having wall thickness of 1mm thick plain PVC rigid foam sheet and EPS as
defined in of desired thickness depending on insulation required shall be insert in a
frame work made using anodized aluminium Tee section of sizes 1”X1” (25X25mm, 19
gauge or 1mm thick) in square pattern of grid sizes of 2’X2’ (600X600mm). The
aluminium framework is supported from the ceiling with the help of G.I. hook and G.I.
wire/6mm.M.S. rods of required sizes to maintain proper level etc. the aluminium
framework is supported on side wall with the use of aluminium 1”X1” (25X25mm)
angles, complete as per direction of Engineer-in-Charge & drawing
371 TBSC-K.I.30 Supply and fixing of PVC false ceiling on MS/GI made skeleton framework. The frame
shall be 24 X 48mm MS tube section fixed along with the wall. The entire frame work
shall be concealed with PVC section having overall dimensions of 6 X 250mm with a
wall thickness of 1mm ± 0.3mm with tongue and groove system, provided with
necessary arrangements for electrical connections, complete, for finished item of work.
373 15 mm - Micro Look Edge 600 x 600 of Board / Tegular/ Micro look Edge
tiles with a Humidity Resistance of 95% RH, Average NRC 0.90, Light
Reflectance >88%, Thermal Conductivity λ = 0.032 w/mk, Fire Performance
Class 0/Class 1suitable for Green Building application, with Recycled content of
88% (FG)
374 16 mm - Tegular Edge 600 x 600 of Board / Tegular/ Micro look Edge tiles with a
Humidity Resistance of 99% RH, Average NRC 0.55, Light Reflectance >84%,
Thermal Conductivity λ = 0.052 to 0.057 w/mk, Fire Performance Class 0/Class 1
375 Providing & Fixing of Lay-in-metal plain ceiling System consisting of 600 x
600mm Lay in GI tiles of pre coated galvanised steel in 0.5 mm thickness in
white colour to be laid on grid systems with 15mm
376 Providing & Fixing of GI Lay in Standard Perforated (2.5mm diameter-16%
open area) metal ceiling consisting of 600 x 600 mm Lay in tiles of pre coated
galvanized steel in 0.5 mm thickness in Global white color acoustical fleece hot
pressed to the back of the perforated tile to be laid on grid systems with 0.5 mm
thickness in white colour with 15mm wide T - section flanges but excluding cost
of Grid systems and having rotary stitching on the Main Runner, 1200 mm
& 600 mm Cross Tees and the tiles with NRC of 0.70, Fire Performance of
Class A2-s1.d0 as per EN13501 standard in module size of 600 X 600 mm
suitable for Green Building application, with Recycled content of 25%
complete for finished item of work
400 TBSC-K.III.03 Supply and fixing of wall lining fixing to GI channels of perimeter channel 30mm x
27mm x 0.55 thick and ceiling channels of 51.1mm x 26mm x 10.5mm x 0.55mm
thick and fixing and finishing using joint compound and glass fibre tape complete finish
as per specification without painting for finished item of work: using 8mmthick
Calcium silicate boards
401 TBSC-K.III.04 Supply and fixing of wall lining fixing to GI channels of perimeter channel 30mm x
27mm x 0.55 thick and ceiling channels of 51.1mm x 26mm x 10.5mm x 0.55mm
thick and fixing and finishing using joint compound and glass fibre tape complete finish
as per specification without painting for finished item of work: Using 10mm thick
Calcium silicate boards
402 TBSC-K.III.05 Supply and fixing of wall lining fixing to GI channels of perimeter channel 30mm x
27mm x 0.55 thick and ceiling channels of 51.1mm x 26mm x 10.5mm x 0.55mm
thick and fixing and finishing using joint compound and glass fibre tape complete finish
as per specification without painting for finished item of work: Using 12mm thick
Calcium silicate boards
403 TBSC-K.III.06 Supply and fixing of cement board (conforming to IS:14862:2000) wall panelling with
frame work made of GI stud profile of size 48 x 40 x 10 x 0.55 mm thick placed at
every 610 mm C/C intervals fixed vertically in between floor and roof ‘U’ track of size
50 x 30 x 0.6 mm thick duly fixed with self-tapping, self-embedding screws fixed
around at every 300 mm (centres) leaving a 3 mm gap. The Gap will be covered with
a decorative beading or jointing compound. Surface will be given a smooth finish with
one coat of primer - With 8 mm Cement Bonded Board
404 TBSC-K.III.07 Supply and fixing of cement board (conforming to IS:14862:2000) wall panelling with
frame work made of GI stud profile of size 48 x 40 x 10 x 0.55 mm thick placed at
every 610 mm C/C intervals fixed vertically in between floor and roof ‘U’ track of size
50 x 30 x 0.6 mm thick duly fixed with self-tapping, self-embedding screws fixed
around at every 300 mm (centres) leaving a 3 mm gap. The Gap will be covered with
a decorative beading or jointing compound. Surface will be given a smooth finish with
one coat of primer - With 10 mm Cement Bonded Board
405 TBSC-K.III.08 Supply and fixing Cement Bonded Particle Board conforming to (IS 14276) wall
paneling using 10 mm Cement Bonded Particle Board conforming to IS 14276 with
frame work made of GI stud section of size 48mm x 35mm x 0.55mm thick placed at
every 610 mm C/C intervals vertically and at 1200mm internals horizontally fixed to the
wall by means of self expansion screws and caps and Cement Bonded Particle Board
conforming to IS 14276 is to be fixed to frame by means of self taping screws placed
at every 300 mm intervals leaving 3mm gap between two panels. The cost inclusive of
one coat of synthetic plastered primer and two coats of synthetic smooth finished putty
and cost & conveyance of all materials, labor charges etc. complete as per the
direction of Engineer in charge.
406 TBSC-K.III.09 Supply and fixing of Cement Bonded Pre-Laminated Particle Board wall paneling
using 12 mm Cement Bonded Pre-Laminated Particle with frame work made of G.I
stud section of size 48mm x 35mm x 0.55mm thick placed at every 610mm intervals
vertically and at 1200mm internals horizontally fixed to the wall by means of self
expansion screws and caps. Cement Bonded Pre-Laminated Particle is to be fixed to
frame by means of self-taping screws placed at every 300mm intervals leaving 3mm
gap between two panels. The cost inclusive of Conveyance of materials, Labor
charges etc., complete as per the direction of Engineer in charge
407 TBSC-K.III.10 Providing and fixing plain PVC rigid foam sheet wall panelling of thickness 5mm
consisting of panels having size 1220mm X2440mm stuck on inner frame work of
25mm wide strips of 5mm thick PVC rigid foam sheet. The strips should have in their
centre a grove of 6mm width and 2mm depth for sinking the head of the screw used to
fix the strips to the wall and should be placed vertically at equal intervals of
405/407mm centre to c entre. The PVC strips shall be fixed to the wall using 65mm
long M.S. screws through the groove in the strip by using PVC fasteners. The distance
between two screws shall not be more than 300mm. a groove of 2mm may be left
at the joint of two panels for aesthetic looks. This framework is done for making
existing wall surface in ensured level and for sticking the wall panelling sheet (panel)
on it with a strips of 5mm thick PVC sheet of width 75mm feathered at the edges
provided at the places where two panels are joined, using solvent cement, complete
as per direction of Engineer-in-Charge, manufacture’s specification & drawing
408 TBSC-K.III.11 Providing and fixing INSULATED PVC WALL panelling shall consist of PVC insulated
panels having wall thickness of 1mm /1.5mm/2mm PVC sheet and the desired
thickness of EPS (dependent on the insulation required) screwed into the wall using
screws of adequate length. The screws shall be placed at a distance of 150mm and
shall be 25mm from the edge of the insulated panel on all from sides of the panel. The
PVC strips of 5mm thick PVC sheet of width 75mm feathered at the edges shall be
stuck using solvent cement adhesive at the places where two panels are joined, so a
to cover the screw of both the panels, using solvent cement. 90 heat bent strips of
5mm thick PVC sheets of width 75mm X75mm feathered at the edges shall be stuck
at wall joints / pillars etc., complete as per direction of Engineer-in-Charge,
manufacture’s specification & drawing
409 TBSC-K.III.12 Supply and fixing of wall panelling on the framework of wooded rippers of 24 X 24mm
of required size. The entire framework shall be panelled with PVC section having
overall dimensions of 6 X 250mm with a wall thickness of 1mm ± 0.3mm. The panels
are joined with tongue and groove system. Necessary cut-outs for electrical
connections to be provided at required places complete, for finished item of work.
413 TBSC-K.IV.03 Supply and Fixing 66mm thick metal stud partition screw fixed to either side of 48mm
studs of 0.55mm thick with 50mm floor and ceiling channel 0.55mm and the joints duly
finished with joining compound, glass fibre tape and two coats dry wall top coat as per
specification finished Item of work - Using 10mm thick Calcium silicate boards
414 TBSC-K.IV.04 Supply and Fixing 66mm thick metal stud partition screw fixed to either side of 48mm
studs of 0.55mm thick with 50mm floor and ceiling channel 0.55mm and the joints duly
finished with joining compound, glass fibre tape and two coats dry wall top coat as per
specification finished Item of work - Using 12mm thick Calcium silicate boards
415 TBSC-K.IV.05 Supply and Fixing 66mm thick metal stud partition using 2 layers of 12mm thick
Calcium silicate boards screw fixed to either side to 48mm studs of 0.55mm thick with
50mm floor and ceiling channel 0.55mm.The boards joints are to be staggered to
avoid through passage. Ceramic wool of 50mm thick, 64kg/m3 density is to be placed
in cavity of the partition. The joints duly finished with joining compound, glass
fibre tape and two coats dry wall top coat as per specification with out painting for
finished item of work
416 TBSC-K.IV.06 Supply and fixing double skin Cement board (conforming to IS: 14862:2000) partition
with Frame work made of GI stud profile of size 48x40x10x 0.55 mm thick placed at
every 610 mm C/C intervals and 1220 mm horizontal intervals duly fixed with self-
expansion screws, the cement board of 8 mm thick cladded around with self-tapping
self-embedding screws fixed at every 300 mm (centres) leaving a 3 mm gap will be
covered with a decorative moulding surface will be given a smooth finish with one
cement primer. The rate is inclusive of cost and conveyance of all materials and
labour charges etc., complete.
417 TBSC-K.IV.07 Providing and fixing of 50 mm thick SOLID WALL PANEL Sandwich panels made of
light Weight FRACC two 5 mm thick non- asbestos fibre reinforced cement sheets
(conforming to IS: 14862:2000) on either side of the lightweight concrete core
composed of Portland cement binders with tongue and groove arrangement. The
bottom of the panel shall be fixed to the floor channel made up of 1 mm thick GI
channels of size 28x52x31 mm fixed to the existing floor with 6x60mm nylon self
expansion screws at 600 mm C/C and top of the panel fixed with ceiling channel made
out of 0.8 mm thick GI Channel of size 31x52x31 mm duly fixed to the existing ceiling
with 6x60mm nylon self expansion screws at 600 mm C/C. All the tongue and
groove joints of the panels have to be properly cleaned and both the panels
have to be fixed by applying the mixture of fly ash and sodium silicate in between
and Everest jointing compound all the exposed joints. The rate includes cost of 50 mm
SOLID WALL PANELS, G.l. Floor and ceiling channel. The panels can be flushed by
using paper tape and Everest jointing compound all complete
418 TBSC-K.IV.08 Providing and fixing of 75 mm thick SOLID WALL PANEL Sandwich panels made of
light Weight FRACC two 5 mm thick non- asbestos fibre reinforced cement sheets
(conforming to IS: 14862:2000) on either side of the lightweight concrete core
composed of Portland cement binders with tongue and groove arrangement. The
bottom of the panel shall be fixed to the floor channel made up of 1 mm thick GI
channels of size 28x77x31 mm fixed to the existing floor with 6x60mm nylon self
expansion screws at 600 mm C/C and top of the panel fixed with ceiling channel made
out of 0.8 mm thick GI Channel of size 31x77x31 mm duly fixed to the existing ceiling
with 6x60mm nylon self expansion screws at 600 mm C/C. All the tongue and
groove joints of the panels have to be properly cleaned and both the panels
have to be fixed by applying the mixture of fly ash and sodium silicate in between
and Everest jointing compound all the exposed joints. The rate includes cost of 75 mm
SOLID WALL PANELS, G.l. Floor and ceiling channel. The panels can be flushed by
using paper tape and Everest jointing compound all complete
419 TBSC-K.IV.09 Providing and fixing of 50 mm thick partition with composite panel comprise of two 5
mm thick non- asbestos fibre reinforced cement sheets (conforming to IS:
14862:2000) on either side of the lightweight concrete core composed of Portland
cement binders with tongue and groove arrangement. The bottom of the panel shall
be fixed to the floor channel made up of 1 mm thick GI channels of size 28x52x31
mm fixed to the existing floor with 6x60mm nylon self expansion screws at 600 mm
C/C and top of the panel fixed with ceiling channel made out of 0.8 mm thick GI
Channel of size 31x52x31 mm duly fixed to the existing ceiling with 6x60mm nylon
self expansion screws at 600 mm C/C. All the tongue and groove joints of the
panels have to be properly cleaned and both the panels have to be fixed by
applying the mixture of fly ash and sodium silicate in between and Everest jointing
compound all the exposed joints. The rate includes cost of 50 mm SOLID WALL
PANELS, G.l. Floor and ceiling channel.
420 TBSC-K.IV.10 Providing and fixing of 75 mm thick partition with composite panel comprise of two 5
mm thick non- asbestos fibre reinforced cement sheets (conforming to IS:
14862:2000) on either side of the lightweight concrete core composed of Portland
cement binders with tongue and groove arrangement. The bottom of the panel shall
be fixed to the floor channel made up of 1 mm thick GI channels of size 28x77x31
mm fixed to the existing floor with 6x60mm nylon self expansion screws at 600 mm
C/C and top of the panel fixed with ceiling channel made out of 0.8 mm thick GI
Channel of size 31x77x31 mm duly fixed to the existing ceiling with 6x60mm nylon
self expansion screws at 600 mm C/C. All the tongue and groove joints of the
panels have to be properly cleaned and both the panels have to be fixed by
applying the mixture of fly ash and sodium silicate in between and Everest jointing
compound all the exposed joints. The rate includes cost of 75 mm SOLID WALL
PANELS, G.l. Floor and ceiling channel.
421 TBSC-K.IV-11 Supply and fixing double skin partition using with 10 mm Cement Bonded
Particle Board conforming to IS 14276 made out of G.I. track section of
size 50mm x 35mm x 0.55 mm for fixing to the roof and floor and stud
section of size 48mm x 35mm x 0.55mm placed in track section vertically at
610mm intervals and at 1200mm intervals horizontally fixed to the wall by
means of self expansion screws and caps to the wall and roof the panel is to be
fixed both sides of frame work by using self taping screws fixed at every 300mm
intervals to the frame work leaving 3 mm gap between two panels. The
cost inclusive with one coat of synthetic primer and two coats of synthetic
plaster smooth finish and cost and conveyance of all materials to site, labor
charges etc., complete as per the direction of Engineer in charge.
422 TBSC-K.IV-12 Supply and fixing of Cement Bonded Prelaminated Particle Board double
skin partition using with 10 mm Cement Bonded Prelaminated Particle Board
made out of G.I track section of size 50 mm x 35mm x 0.55mm for fixing to the
roof and floor and stud section of size 48mm x 35mm x 0.55mm placed
in track section vertically at 610mm intervals and at 1200mm internals
horizontally. The frame is fixed by means of self expansion screws and
caps to the wall / roof. Cement Bonded Prelaminated Particle Board is to be
fixed both sides of the frame work by using 2mm thick electro plated CR flat
section leaving 3mm gap between two panels. The cost inclusive of cost and
conveyance of all materials to sites, other materials incidentals and labour charges
as per the direction of Engineer in charges.
423 TBSC-K.IV-13 Supply and fixing of Cement Bonded Prelaminated Particle Board
aluminum glazed partitions using 10MM Cement Bonded Prelaminated Particle
Board and 5.00 mm thick plain glass to full height. Using with Cement Bonded
Prelaminated Particle Board to a height of 0.91 meter at bottom panel and
remaining height with glass and aluminum sections anodized to 12 to 15
microns and of sections of size 37mm x 62mm and 1.5mm thickness with
one meter centre to centre duly fixed with clip beading on both sides
including fixing the frame to pillars by M.S. flats, bolts and nuts including cost
and conveyance of all materials etc., complete as directed during execution.
424 TBSC-K.IV-14 Providing and fixing 50mm thick SEMI HEIGHT SOLID PVC PARTITION
consisting of 49mm sandwich PVC panel made out of 36mm high density
expanded polystyrene sheet (E.P.S.-Thermocol) stuck on both side with 2mm
thick plain/printed /prelam PVC rigid foam sheets reinforced with frame work
made from 35mm X 5mm M.S. Angle. In between two M.S. Angles 5mm thick plain /
printed /prelam heat molded PVC ‘C’ channel of size 50 X 100mm with feathered
edges shall be fixed on the floor & 50 X 75mm with feathered edges
plain/printed /prelam PVC ‘C’ channel. In between adjoining EPS sandwiched
PVC partitions panel 5mm thick X 75mm width plain / printed / prelam PVC
sheet feathered at edges shall be stuck on front & back face using solvent
cement etc. in places where two partitions meet to from an ‘L’ shape the panels
are joined 5mm thick plain/printed / prelam heat molded PVC ‘L’ section of size
75mmX75mm with feathered edges shall be fixed on front & back side. This is
done to maintain the symmetry of design. An additional 5mm thick PVC strip of
40mm width is to be stuck on the interior side of the ‘C’ Channel using PVC solvent
adhesive, complete as per direction of Engineer-in-Charge, manufacture’s
425 TBSC-K.IV-15 Supply and fixing of PVC Double Skin Partition. The entire framework shall be
carried out by mild steel section having overall dimensions of 24 X 48mm with a wall
thickness of 1.2mm. The entire framework shall be concealed with PVC section
having overall dimensions of 6 X 250mm with a wall thickness of 1mm ± 0.3mm
both sides. Glass provision /Door provision can be provided along the partition
wherever required. Partitions can be made full or half as per requirement
complete, for finished item of work.
426 TBSC-K.IV-16 Supply and fixing double skin cement based Board partition with Frame work
made of GI stud profile of size 48x40x 10x 0.6 mm thick placed at every 610
mm C/C intervals and 915 mm horizontal intervals duly fixed with self
expansion screws, the Cement Bonded Board of 8 mm thick cladded around
with self tapping self embedding screws fixed at every 300 mm (centres) leaving
a 3 mm gap between two panels of width 2’- 0”(610 mm). The Gap will be
covered with a decorative molding surface will be given a smooth finish over
cement primer. The rate Inclusive of cost and conveyance of all materials
and labour charges etc., Complete. DOUBLE SKIN PARTITION
427 TBSC-K.IV-17 Supply and fixing of partitions made of seccolor pre- painted steel (base steel
as per IS 513 of 0.58 mm thick ‘D’ quality, galvanized as per IS 277 with Zinc
of 120 GSM). Primer coated with epoxy primer of 5-7 microns thick, finish
painted with a polyester paint of 12-16 microns thick alkyd backer. Section for
outer frame should be 46 x 52mm, section for shutter should be 46 x 46mm,
section for mullion should be 46 x 70mm, section for beading should be 18x25mm
and section for middle and bottom rail (Lock Rail and Kick Rail) of size should be
23x130mm. The partition should be paneled with 9mm pre-laminated particle
board to a height of 0.91m from the bottom, and remaining height with 5mm thick
plain glass With Ethyl Propylene Diametermine Monomer (EPDM) Gaskets. The
sections are to be cut to length, mitre joined with corner bracket Centre mullions are
to be fixed using mullion cap. Gaskets made of Ethyl Propylene Diametermine
Monomer (EPDM). Corner brackets made of CRCA with zinc phosphate. Mullion
caps made of Glass filled nylon. The above frames should be fixed to the
concrete / masonry wall by means of self expanding screws, and complete for
428 TBSC-K.IV-18 Supply and fixing of partitions made of seccolor pre- painted steel (base steel
as per IS 513 of 0.58 mm thick ‘D’ quality, galvanized as per IS 277 with Zinc
of 120 GSM). Primer coated with epoxy primer of 5-7 microns thick, finish
painted with a polyester paint of 12-16 microns thick alkyd backer. Section for
outer frame should be 46x52mm, section for shutter should be 46 x 46mm,
section for mullion should be 46 x 70mm, section for beading should be
18x25mm and section for middle and bottom rail (Lock Rail and Kick Rail) of size
should be 23x130mm. The partition should be paneled with 9mm pre-laminated
particle board to a height of 0.91m from the bottom, and remaining height with
5mm thick plain glass With Ethyl Propylene Diametermine Monomer (EPDM)
Gaskets. The sections are to be cut to length, mitre joined with corner bracket Centre
mullions are to be fixed using mullion cap. Gaskets made of Ethyl Propylene
Diametermine Monomer (EPDM). Corner brackets made of CRCA with zinc
phosphate. Mullion caps made of Glass filled nylon. The above frames should
be fixed to the concrete / masonry wall by means of self expanding screws, and
complete for finished item of work Fixed Partition with Door: Outer frame section size
428 TBSC-L.I-02 Powder Coated Mild Steel Hallow single rebate door frames manufactured using
cold roll formed process steel sheet of 1.25 mm thick bright (Cold Rolled
Close Annealed (CRCA) and profile size of 105 x 60 mm conforming to
IS 4351 - 2003 including pretreatment, Galvanized as per IS:277, zinc
phosphating finished with Thermosetting Polyurethane paint of Aliphatic Grade
providing high levels of scratch resistance and durability / Epoxy polyester powder
for powder coating paint thickness 60 – 65 microns (Dry film thickness) Stainless
Steel Ball Bearing Butt Hinges 3mm thick fixed flush to the frame with Hinges,
Base Ties, Holdfast Lugs, Mortar Guards, shock absorbers and provision for
Tower Bolts, Aldrops, Lock & Strike plates etc. for both single and double shutter
doors
429 TBSC-L.I-03 Providing and fixing factory made polyvinyl chloride (PVC) Door Frame of
the size 50 x 47mm with a wall thickness of 5mm, made out of extruded 10
mm rigid PVC foam sheet, mitre cut at two corners and joined with 2nos. of
150mm long brackets of 15x15mm M.S. square tube. The two vertical door
profiles are to be reinforced with 19x19mm M.S. Square tube of 19 gauge. The
door frame shall be fixed to the wall using 65/100mm long M.S. Screws
through the frame by using PVC fasteners. A minimum of 4nos. of screws to be
provided for each vertical member & minimum 2nos. for horizontal member etc.
complete as per manufacturers specification and direction of Engineer-in-Charge
for finished item of work
430 TBSC-L.I-04 SUPPLY & FIXING SINGLE SIDE PRELAM SOLID PANEL PVC DOOR FRAME
(CHOUKHAT) Providing and fixing factory made Pac single side Prelam door
frame of the size 50 X 47 mm with a wall thickness of 5mm, made out of extruded
5mm rigid Pac single side prelam sheet, meter cut at two corners and
joined with 2nos. of 150mm long brackets of 15 x 15mm MS. Square tube. The
two vertical door profiles are to be reinforced with 19 X 19mm MS. square
tube of 19guage. The door frame shall be fixed to the wall using 65/100mm
long MS. Screws through the frame by using Pac fasteners. a minimum of
4nos. of screws to be provided for each vertical member and minimum 2nos. for
horizontal member etc. complete as per manufacture specification and direction
of Engineer-in-charge.
431 TBSC-L.I-05 Supply and fixing of door frame made of hollow extruded PVC section having
dimensions of 40 X 57mm with the wall thickness of 2mm +/- 0.2mm duly
reinforced with seasoned wood plank at the hinges side.The door frame top 2
corners shall be metri-cut/ welded. PVC DOOR FRAME.
432 TBSC-L.I-06 Supply and fixing of door frame made of hollow extruded PVC section having
dimensions of 40 X 46 mm with the wall thickness of 2mm +/- 0.2mm duly reinforced
with seasoned wood plank at the hinges side. The door frame top 2 corners shall be
mitre cut/welded
433 TBSC-L.I-07 Supply & fixing of Door frames made of all formed sections of 1.25mm thick CRCA
section, size should be 50x60mm with 32mm rebate. The corner of the frame
should be welded. The frame should be painted with one coat of primer and finished
painted with pure polyester paint. The frame should be provided with approved
quality butt hinges of 3 Nos. complete for finished item.: Single shutter 3'-0" x 7'-0"
( 914.4 x 2133.6mm ) outer frame section size of 50 x 60 mm
434 TBSC-L.I-08 Supply & fixing of Door frames made of all formed sections of 1.25mm thick CRCA
section, size should be 50x60mm with 32mm rebate.The corner of the frame
should be welded. The frame should be painted with one coat of primer and
finished painted with pure polyester paint. The frame should be provided with
approved quality butt hinges of 3 Nos. complete for finished item.: Double shutter 5'-
0" x 7'-0" (1524 x 2133.6mm) outer frame section size of 50 x 60 mm
435 TBSC-L.I-09 Supplying & fixing of Door frame made of roll formed section of 1.25 mm thick
CRCA section, size should be 50 x 75 mm with 32 mm rebate. The corner of the
frame should be welded. The frame should be painted with one coat of primer and
finished painted with pure polyester paint. The frame should be provided with
approved quality butt hinges of 3 Nos. Complete for finished item of work.: Single
shutter 3'-0" x 7'-0" (914.4x2133.6mm) outer frame section size of 50 x 75 mm
436 TBSC-L.I-10 Supplying & fixing of Door frame made of roll formed section of 1.25 mm thick
CRCA section, size should be 50 x 75 mm with 32 mm rebate. The corner of the
frame should be welded. The frame should be painted with one coat of primer and
finished painted with pure polyester paint. The frame should be provided with
approved quality butt hinges of 3 Nos. Complete for finished item of work.: Single
shutter 5'-0" x 7'-0" (1524x2133.6mm) outer frame section size of 50 x 75 mm
437 TBSC-L.I-11 Providing and fixing door frames fabricated from sections made of galvanized steel
powder coated (base steel as per IS 513, galvanized as per IS 277 with zinc of 120
grams / square metre), the factory made section are powder coated with pure
polyester powder of 50-60 microns thick with total coated thickness of 1.25
mm, size of door frame section is of 105 x 60 mm with a rebate of 38 mm
to accommodate 35 mm thick door shutter, with groove to insert gasket in
the frame section, frame section filled with polyurethane foam, cut to length, and
joined by way of welding, each frame provided with: a) 2mm thick MS powder
coated butt hinges of 100 mm long – 3 Nos. for single shutter, 6 Nos. for double
shutter. b) CRCA electroplates stiffeners of 6 Nos – 3 in each vertical. c) 40 mm x
200 mm x 1.2 mm hold fasts screwed to stiffeners – 6 Nos. with split end tail.
d) Nylon Aldrop Receiver – 1 No. for single shutter frame. e) Tie Rod – 1 No
438 TBSC-L.I-12 Providing and fixing of door frames factory made, internal door frames
without threshold, fabricated from pre painted cold roll formed section 100 mm x
60 mm made of galvanized (base steel as per IS-513 ‘D’ quality galvanized as
per IS-277 with Zinc of 120 Gms/sqm) steel colour coated sections with total
coated thickness of 1 mm primer coated with epoxy primer of 5-7 microns
thick finish painted with polyester paint of 12- 16 microns and back coated with
alkyd backer of 5-7 microns, the frame section filled with polyurethane (PU Foam)
of 40 kg/Cum and the sections cut to length and mitre joined by means of
1.25 mm thick CRCA electroplated corner brackets of size 75 x 75 mm and 1.25
mm thick electroplated stiffeners of size 150 mm for fixing hold fasts and
hinges with MS Powder coated fittings a) 6 Nos M.S. Z Type hold fasts made of 30
mm x 3 mm MS flat of 230 mm long, 3 Nos Each size expandable PVC
covered screw type fasteners b) 2.5 mm x 300 mm long ‘T’ hinges /2.5 mm x 50
mm x 50 mm x 100 mm two way but hinges (3 Nos for single leaf or 2 Nos for
Double leaf/leaf) c) 12 mm Diameter MS tie rod at bottom with necessary size of nuts
on either side.
439 TBSC-L.I-14 Supply and fixing of factory made Bathroom door frames without threshold,
fabricated from pre-painted cold roll formed section 50mm x 50 mm made of
galvanized steel as per IS – 513 ‘D’ quality, galvanized as per IS-277 steel colour
coated sections primer coated with epoxy primer finish painted with polyester
paint the frame section filled with polyurethane (P.U. Foam) of 40 Kg/Cum; and
the sections joined by means of 1.25mm thick CRCA electroplated corner
brackets of size 75 x 75 mm and 1.25mm thick electroplated stiffeners of size
150mm for fixing hold fasts and hinges together with the following MS Power
coated fitting (Supply and fixing) of approved make. a) 6 Nos M.S. Z. Type
hold fasts made of 30mm x 3 mm MS flat of 230mm long, 3 Nos each side
expandable PVC covered screw type fasteners b) 2.5mm x 300 mm long ‘T’
hinges / 2.5mm x 50 mm x 100mm two way but hinges (3 Nos for single leaf or 2
Nos for Double leaf /leaf )c) 12 mm Diameter MS tie rod at bottom with necessary
size of nuts on either side.
440 TBSC-L.I-16 Supply of factory made Precast Reinforced Cement concrete door frame of with
overall dimension of 60 x 100 mm for single shutter door (+/-2mm) three nos, of
6mm dia steel bars are used for longitudinal reinforcement for each vertical and
horizontal member and are held firmly by 3mm dia ties spaced at not more than
300mm c/c Polymer wonder blocks are provided in the frames for tower bolt and
hinges provisions made in the frame for aldrops provisions are made in the
vertical member for fixing of 3 nos.hold-fasts with 8 mm dia bolts and the frame
surface shall be smooth without any voids and shall confirm to IS 6523
complete finished item including all taxes as per specifications & the directions of
the Engineer-in- Charge.
441 TBSC-L.I-18 Supply of factory made Precast Reinforced Cement concrete double door frame of
the door frame shall have overall dimension of 60 x 125 for single shutter door(+/-
2mm) four nos, of 6mm dia steel bars are used for longitudinal reinforcement for
Each vertical and horizontal member and are held firmly by 3mm dia ties spaced at
not more than 300mm c/c Polymer wonder blocks for fixing of towerbolt and
hinges with provision for aldrops and 3 nos. hold-fasts with 8mm dia bolts and the
frame surface shall be smooth without any voids and shall confirm to IS 6523
complete finished item including all taxes as per specifications & the directions of
the Engineer-in-Charge.
442 TBSC-L.I-20 Fixing of precast RCC frames (Precast RCC framed members to be supplied at
site) including assembling the members for door frames fixing to MS masonry
or RCC wall face including providing and fixing Six no. hold-fasts of MS
Flat 40x5mm and length 40cm per frame embedding in cement concrete
blocks of size 30x10x15 cm of mix (1 cement:3 Coarse sand: 6 graded stone
aggregate 20 mm nominal size) complete as per specification & the directions of
the Engineer-in-Charge
452 TBSC-L.II-10 Flush door shutters, solid bond wood block board type with teak veneer on one face
and commercial ply on another face (lipping): 30mm thick conforming to IS:2202
453 TBSC-L.II-11 Flush door shutters, solid bond wood block board type
with teak veneer on one face and commercial ply on
another face (lipping): 35 mm thick conforming to
IS:2202
454 TBSC-L.II-12 Flush door shutters, solid bond wood block board type
with teak veneer on one face and commercial ply on
another face (lipping): 40 mm thick conforming to
IS:2202
455 TBSC-L.II-13 Supply and fixing of Cement Bonded Prelaminated
Particle Board single door shutter using 16MM Cement
Bonded Prelaminated Particle Board with all round
section “U” size of mm thick galvanized pre-painted cold
rolled steel profiles Cement Bonded Prelaminated
Particle Board with necessary screws fixed at every 1’0”
( 304.8mm) intervals. The cost inclusive of MS Nickel
coated 250mm long Aldrops 2 no’s , MS powder coated
250mm long tower bolt 1 no’s, 2no’s MS powder coated
125mm long grip handle, 1 no’s M.S.P.C. Door stopper.
Including cost and conveyance of all materials at site
labour charges etc., complete finished item of work.
456 TBSC-L.II-14 Supply and fixing of Cement Bonded Prelaminated
Particle Board double door shutter using 16MM Cement
Bonded Prelaminated Particle Board with all round “U”
section size of 20mm x 18mm x 20mm made from
0.6mm thick galvanized pre-painted cold rolled steel
profiles with Cement Bonded Prelaminated Particle
Board separating two shutter with 30mm x 20mm x
30mm stepped lipping with necessary screws fixed at
every 1’0” (304.8mm) intervals. The cost inclusive of MS
Nickel coated 250mm long Aldrops 2no’s, MS powder
coated 125mm long grip handle, 2 no’s M.S.P.C. Door
stopper. Including cost and conveyance of all materials
at site labour charges etc., complete finished item of
work.
460 TBSC-L.II-18 Supply and fixing door shutter with frame made out of
PVC section and panels conforming to IS:10151-1982
having panel sizes of 100 mm x 30 mm with self
extruded grooves at 40 mm x 50 mm grooves on front
face and the infill panel dimension is 610 mm x 20 mm
seamless hallow multi chambered PVC single panel for finished item of work
461 TBSC-L.II-19 Molded panel solid core flush doors using water-
resistant hardwood fibre HDF / MDF fibre boards skins
of 2.5 mm thick of 30 mm thick
462 TBSC-L.II-20 Molded panel solid core flush doors using water- resistant hard wood fibre HDF /
MDF fibre boards skins of 2.5 mm thick 35 mm thick
463 TBSC-L.II-21 Solid core membrane flush doors using rigid PVC membrane of 0.3mm thick of
different elegant shades doors - 30 mm thick
464 TBSC-L.II-22 Solid core membrane flush doors using rigid PVC membrane of 0.3mm thick of
different elegant shades doors - 35 mm thick
465 TBSC-L.II-23 Providing and fixing 35mm thick FACTORY MADE MOULDED DOOR SHUTTER
consisting of solid core single leaf flush door of 30mm thickness, lipped with
15mm ( 5mm X 3 ) thick X 30mm width on one stiles and top rails and 10mm
(5mm X 2 ) thick X 30mm width on the other stiles and bottom rails. The
inner panel laminated with 2mm thick termite proof, water proof and fire
resistant molded Pac sheet with 2,4,6 raised panel design in different panel
and / or prelam colours on one side after routing the molded design on flush
door and 2mm prelam Pac sheet on other side using rubber adhesive on
flush door and solvent cement adhesive on Pac lipping etc. complete as per
direction of Engineer-in-Charge, manufacture specification and drawing.
466 TBSC-L.II-24 Supply & Fixing SOLID STEEL DOOR shutter made out of G I Precoated Sheet with
an average wall thickness of 0.35 mm on both sides. MS Tube having dimensions
of 19 x 19 mm is inserted along the hinge side of the door, core of the door
shutter filled with High Density Polyurethane foam injected with the help of
hydraulic injection method, four sides of the door covered with G I Precoated Sheet
and the hardware locations reinforced with suitable wooden blocks as per drawing
and stickers indicating location of the hardware pasted at appropriate places, etc
complete
467 TBSC-L.II-25 Providing of 35mm thick Factory made Prelaminated ABS (Acrolynitrile Butadyne
Styrene) Door shutter moulded in different designs, consisting of all round Frame
made out of water proof solid foam PVC bar of size 20x32mm, reinforced by 32x
32mm - 2 nos. for vertical made out of LVL (Laminated Veneer Lumber),
core material of 32 mm thick high density craft paper honey comb board,
sandwiched on both sides with prelaminated ABS sheet thickness of
1.5mm . PVC edge banding of size 0.45mm on the vertical sides for each
shutter and ISI make S.S round lock complete for finished item of work
468 TBSC-L.II-26 Supply and fixing of Cement Bonded Prelaminated Particle Board door shutter
conforming to IS-14276 made out of U sections of size 12 x 18 x 12 made
from 0.6mm thick PPS sections with 16 mm Cement Bonded Prelaminated Particle
Board with necessary screws fixed at every 1’.0”interwells. The hardware
consists of 12 mm dia x 200mm long Aluminium Aldrops – 2 Nos. 125 mm long
Handle- 2 Nos. 3 mm x 12 mm x 180 mm long 304 SS hinges- 3 Nos with pole
receiver of 10mm dia pole X40mm long welded on 2mm X40mm(ss304) plates
works as receiver for RT patte hinges. The cost is inclusive of all
incidentals, labour transportation charges.
471 TBSC-L.III-05 Providing and fixing 30mm thick FACTORY MADE WIRE
MESH SOLID PVC DOOR SHUTTER consisting of frame
made out of M.S. tubes of 19 gauge thickness and size of
19mmX19mm for stiles and 15mm for top, lock &
bottom rails. MS. Frame shall have a coat of steel
primers of approved make and manufacture.
19mmX19mm M.S. square tubes shall be covered with
5mm thick heat molded “” PVC ‘C’ channel of size 30mm
thickness, 90mm width out of which 75mm shall be flat
and 15mm shall be flat and 15mm shall be bent in 900
on the inner side to from top and bottom rail land
130mm wide PVC sheet out of which 100mm shall be
flat and 154mm shall be bent in 900 on both side to
from lock rail, 10mm(5mmX2) thick, 20mm wide cross
PVC sheet as gap insert for top rail & bottom rail. Panel
will be of G.I. wire mesh of 24gauge to be fitted in by ’C’
channel of size 35mm X10mm on the either side in the
stiles. The inner side ‘C’ channel is fixed by
19mmX19mm MS. Tube on both sides with screws. The
wire mesh in top bottom & lock rail is sealed with15mm
X 15mm tube with G.I. wire 10mm(5mmX2) thick PVC
strip of 25mm width is to be stuck& nails on both side of
G.I. wire mesh interior at the top, bottom & lock rail. An
additional 5mm thick PVC strip of 20mm width is to be
stuck on the interior side of the ‘C’ channel using PVC
solvent cement adhesive etc. complete as per direction
of Engineer-in-charge, manufacturer’s specification &
drawings
472 TBSC-L.III-06 Providing and fixing door & shutter of which frame
made from 1.2 mm powder coated cold rolled steel
profiles of overall section size of 60 mm x 45 mm with
21 mm rebate for shutter with necessary stiffeners
hinges and screws with Cement bonded Particle BOARD
(IS 14862) shutter with all-round style “U” lipping of
size 15 x 18 x 15 mm made from 0.8 mm thick CRCA
powder coated steel profile with 16 mm thick Cement
bonded Particle board with necessary screws fixed at
every 1’-0” interval 250 mm long Aldrops 2 nos. M.S.
nickel coated 250 mm long 1 no. M.S. Tower Bolts
including cost and conveyance, one coat of primer, 2
coats of luppum and 2 coats of synthetic enamel paint as
per approved colour, labour charges etc.
473 TBSC-L.III-07 Doors Frames (Colour Coated Steel Sections) & Shutter
using Cement Bonded Particle Board as per IS 14276
(Cement Bonded Particle Board conforming to IS
14276): Providing and fixing of door frame made from
cold roll formed sections made of galvanized (Base steel
as per IS277 with zinc of 120 Gms/sqm) colour coated
steel sections with total coated thickness of 1mm,
primer coated with epoxy primer coat of 5-7 microns
thick, finish paint with polyester paint of 12-16 microns.
The Section for door frame is to be filled with
polyurethane (P.U) form of 40kg/m3. Overall size of
frame section should be of 50mm x 50mm. With
necessary corner brackets, stiffeners, hinges, and
screws. Cement Bonded particle board shutter (Cement
Bonded Particle Board conforming to IS 14276) “Single
Leaf” with all round styles “U” section of size 12m x 18m
x 12mm made from 0.6 mm thick galvanized, colour
coated cold rolled steel profiles with 16mm thick
Cement Bonded particle Board (Cement Bonded Particle
Board conforming to IS 14276) with necessary screws
fixed at every 1’-0” (304.8mm) intervals. The cost
inclusive of MS nickel coated Aldrop of size 250mm long
2nos. 200mm long tower bolt 1no., 125mm handles
2nos., cost and conveyance of all materials at site and
applying one coat primer , one coat of luppum and two
coats of synthetic enamel paint as per approved design
for finished item of work
479 TBSC-L.III-13 Supplying and fixing door shutter, with shutter frame
and infill panel made from PVC material conforming to
IS: 10151-1982, the shutter frame made out of PVC
extruded sections having overall dimension of 47 mm x
33 mm with wall thickness of 1.2mm + 0.3mm with
usual process variation, the shutter frame with tapered
shape to provide better grip to the infill panel end to
drain out the water The Infill panel is made out of PVC
Sections having Overall Dimensions of 200 mm x 20 mm
with wall thickness of 1mm + 0.2mm, the shutter frames
mitre cut and joined at the corner, by providing
Polymeric “ L” type corners to take hardware & fixtures
fixed with 10-20mm counter sunk fully threaded
parallel shank steel screws, all the hardware locations
reinforced with special polymeric bars as per drawings,
stickers showing locations of different hardware pasted
on the shutter, the infill panels joined by tongue and
groove method.
480 TBSC-L.III-14 Supply and fixing of door shutters made of rigid PVC
extruded hollow section of 20mm X 200 mm with the
wall thickness of 1.0mm +/- 0.1mm equally divided into
4 no's with tongue and groove locking arrangements.
The shutter frame is made of 30mm X 79mm with the
wall thickness of 1.5mm +/-0.15mm section mitre-cut
and joined at 4 corners with 125mm X 225mm plastic
brackets. The shutter shall be horizontally reinforced
with 2 no's of 8mm PVC rods. Teak wood batons shall be
reinforced inside the door shutter during the fabrication
of the door shutter at those points wherever the
hardware is fixed onto the door shutter.
481 TBSC-L.III-15 Providing & fixing 30 mm thick solid panel PVC door
shutter consisting of frame made out of 19 gauge M.S
tube of 19 x 19 mm for stiles, top & bottom rail, with a
coat of primer of approved make. M.S. Frame covered
with 5 mm thick heat molded PVC “C” channel of size of
30 x 50 mm forming stiles, 5 mm thick 75 mm wide
PVC sheet for top, lock & bottom rail on either side 20
mm wide cross PVC sheet as gap insert for top & bottom
rail, paneling of 10mm(+/-)( 5mm+5mm)” thick PVC
sheet fitted in the M.S. frame welded /sealed to the
stiles, on either side joined together with solvent
cement adhesive etc., additional 5 mm thick PVC strip of
20 mm width stuck on the interior side of the C channel
using solvent cement, complete as per direction of
Engineer–in–charge, manufacturers specification.
485 TBSC-L.III-19 Providing & Fixing of Scientific Doors with metal door
frames and door shutters made of galvanize steel (base
steel as per IS 513 of 0.58 mm thick D quality,
galvanized as per IS 277 with Zinc of 120 GSM)coated
with Zinc Phosphate Primer to receive any paint on site
or finished with Thermosetting Polyurethane paint of
Aliphatic Grade providing high levels of scratch
resistance and durability/Epoxy polyester powder for
powder coating paint thickness 50-60 microns (Dry film
thickness) outer frame section of 100 x 58 mm x 1.2 mm
thick, shutter section of 0.80 mm thick galvanized steel
sheet pressed (roll formed) for 46mm thick fully flush,
double skin door shell seam joints at stile edges, in-fill of
honeycomb kraft paper used to give the required
rigidity and effective acoustic insulation with 6” Tower
bolt – 1 No., 6” D handles – 2 Nos., 10” Aldrop – 1 No.,
Butt Hinges – 3 Nos, Mortise Lock of approved quality –
1 No, frames fixed to the concrete/masonry wall by
means of self expanding screws complete for finished
item of work for Single leaf Door
486 TBSC-L.III-20 Providing & Fixing of Scientific Doors with metal door
frames and door shutters made of galvanize steel (base
steel as per IS 513 of 0.58 mm thick D quality,
galvanized as per IS 277 with Zinc of 120 GSM). coated
with Zinc Phosphate Primer to receive any paint on site
or finished with Thermosetting Polyurethane paint of
Aliphatic Grade providing high levels of scratch
resistance and durability/Epoxy polyester powder for
powder coating paint thickness 50-60 microns (Dry film
thickness) outer frame section of 100 x 58 mm x 1.2 mm
thick, shutter section of 0.80 mm thick galvanized steel
sheet pressed (roll formed) for 46mm thick fully flush,
double skin door shell seam joints at stile edges, in-fill of
honeycomb kraft paper used to give the required
rigidity and effective acoustic insulation with 6” Tower
bolt – 2 Nos., 6” D handles – 2 Nos., 10” Aldrop – 1 No.,
Butt Hinges – 6 Nos, Mortise Lock of approved quality –
1 No, frames fixed to the concrete/masonry wall by
means of self expanding screws complete for finished
item of work for Double leaf Door
487 TBSC-L.III-21 Supply & Fixing of Stainless steel doors, frames &
shutters made of stainless steel grade 304 of hairline
finish, frame with 1.2mm thick formed to single rebate
profile of size 100 mm X 58 mm and filled with in-fill
Polyurethane foam, the Door Shutters are with 0.80 mm
thick Stainless steel Sheet formed to provide a 46 mm
thick fully flush, double skin door shell with Lock Seam
joints at stile edges, fitted with in-fill of Honeycomb
Kraft Paper, the Shutter provided with 6 MM clear float
vision glass in Circular, Square or Rectangular shapes,
Stainless Steel Ball Bearing Butt Hinges 3 mm thick fixed
flush to the frame and shutter (Profile 102x76x3mm
thick).Mortise Sash Lock with Lever Handles, Mortise
Dead Bolt, etc for industrial, commercial, residential,
clean room applications
488 TBSC-L.III-22 Supply & Fixing of Powder Coated Fire Rated doors,
frames & shutters made of Skin pass galvanized Iron
sheet conforming to Base Steel as per IS 513 “D” Quality,
Galvanized as per IS 277 with Hot Zinc Coating of 120
grams / Sq.Mtr with powder coating of thickness 60-65
Microns, frame with 1.2mm thick Skin pass Galvanized
Iron sheet formed to double rebate profile of size 143
mm X 58 mm with maximum bending radius of 1.4 mm
and filled with in-fill Polyurethane foam, the Door
Shutters are with 0.80 mm thick Skin pass Galvanized
Iron Sheet formed to provide a 46 mm thick fully flush,
double skin door shell with Lock Seam joints at stile
edges, fitted with in-fill of Honeycomb Kraft Paper and
coated with polyester powders of Pure polyester/
epoxy polyester or polyurethane powder for powder
coating of thickness 60 – 65 microns and are coated
with Zinc Phosphate Primer to receive any paint on site
or finished with Thermosetting Polyurethane paint of
Aliphatic Grade providing high levels of scratch
resistance and durability, the Shutter provided with 6
MM clear float vision glass in Circular, Square or
Rectangular shapes, Stainless Steel Ball Bearing Butt
Hinges 3 mm thick fixed flush to the frame and shutter
(Profile 102x76x3mm thick).Mortise Sash Lock with
Lever Handles, Mortise Dead Bolt, etc for 120 minutes
Fire Rated door conforming to IS:3614 (Part2) 1992
489 TBSC-L.III-23 Supply & Fixing of Powder Coated Fire Rated doors,
frames & shutters made of Skin pass galvanized Iron
sheet conforming to Base Steel as per IS 513 “D” Quality,
Galvanized as per IS 277 with Hot Zinc Coating of 120
grams / Sq.Mtr with powder coating of thickness 60-65
Microns, frame with 1.2mm thick Skin pass Galvanized
Iron sheet formed to double rebate profile of size 143
mm X 58 mm with maximum bending radius of 1.4 mm
and filled with in-fill Polyurethane foam, the Door
Shutters are with 0.80 mm thick Skin pass Galvanized
Iron Sheet formed to provide a 46 mm thick fully flush,
double skin door shell with Lock Seam joints at stile
edges, fitted with in-fill of Honeycomb Kraft Paper and
coated with polyester powders of Pure polyester/
epoxy polyester or polyurethane powder for powder
coating of thickness 60 – 65 microns and are coated
with Zinc Phosphate Primer to receive any paint on site
or finished with Thermosetting Polyurethane paint of
Aliphatic Grade providing high levels of scratch
resistance and durability, the Shutter provided with 6
MM clear float vision glass in Circular, Square or
Rectangular shapes, Stainless Steel Ball Bearing Butt
Hinges 3 mm thick fixed flush to the frame and shutter
(Profile 102x76x3mm thick).Mortise Sash Lock with
Lever Handles, Mortise Dead Bolt, etc for 60 minutes
Fire Rated door conforming to IS:3614 (Part2) 1992
490 TBSC-L.III-23 Supply & Fixing of Stainless steel Fire Rated doors, frames & shutters made of
Stainless steel of 304 grade hairline finish, frame with 1.2mm thick Stainless steel of
304 grade hairline finish sheet formed to double rebate profile of size 143 mm X 58
mm with maximum bending radius of 1.4 mm and filled with in-fill Polyurethane
foam, the Door Shutters are with 0.80mm thick Stainless steel of 304 grade hairline
finish Sheet formed to provide a 46 mm thick fully flush, double skin door shell
with Lock Seam joints at stile edges, fitted with in- fill of Honeycomb Kraft Paper and
coated with polyester powders of Pure polyester/ epoxy polyester or polyurethane
powder for powder coating of thickness 60 – 65 microns and are coated with
Zinc Phosphate Primer to receive any paint on site or finished with Thermosetting
Polyurethane paint of Aliphatic Grade providing high levels of scratch resistance
and durability, the Shutter provided with 6 MM clear float vision glass in
Circular, Square or Rectangular shapes, Stainless Steel Ball Bearing Butt Hinges 3
mm thick fixed flush to the frame and shutter (Profile 102 x 76 x 3mm
thick).Mortise Sash Lock with Lever Handles, Mortise Dead Bolt, etc for 120
491 TBSC-L.III-24 Supply & Fixing of Stainless steel Fire Rated doors,
frames & shutters made of Stainless steel of 304 grade
hairline finish, frame with 1.2mm thick Stainless steel of
304 grade hairline finish sheet formed to double rebate
profile of size 143 mm X 58 mm with maximum bending
radius of 1.4 mm and filled with in-fill Polyurethane
foam, the Door Shutters are with 0.80 mm thick
Stainless steel of 304 grade hairline finish Sheet formed
to provide a 46 mm thick fully flush, double skin door
shell with Lock Seam joints at stile edges, fitted with in-
fill of Honeycomb Kraft Paper and coated with polyester
powders of Pure polyester/ epoxy polyester or
polyurethane powder for powder coating of thickness
60 – 65 microns and are coated with Zinc Phosphate
Primer to receive any paint on site or finished with
Thermosetting Polyurethane paint of Aliphatic Grade
providing high levels of scratch resistance and
durability, the Shutter provided with 6 MM clear float
vision glass in Circular, Square or Rectangular shapes,
Stainless Steel Ball Bearing Butt Hinges 3 mm thick fixed
flush to the frame and shutter (Profile 102x76x3mm
thick).Mortise Sash Lock with Lever Handles, Mortise
Dead Bolt, etc for 60 minutes Fire Rated door
conforming to IS:3614 (Part2) 1992
492 TBSC-L.III-25 Supply & Fixing of Lead Lined Clean room doors frames
and shutters made of Skin pass galvanized Iron sheet
(Conform to Base Steel as per IS 513 “D” Quality,
Galvanized as per IS 277 with Hot Zinc Coating of 120
grams / Sq.Mtr).with powder coating of thickness 60-65
Microns, frame of 1.60mm thick galvanized steel sheet
(Conform to IS 277) formed to Single/double rebate
profile of size 100mm X 58mm/ 143x58mm, door
frames with a single / multi Layer of Lead sheet varying
thickness from 3mm /1mm to 2mm depends on
radiation level, the shutter with 1.2 mm thick
Galvanized Steel Sheet (Conform to IS 277) formed to
provide a 46mm thick fully flush, double skin door shell
with Lock Seam joints at stile edges with a single / multi
Layer of Lead sheet varying thickness from 3mm /1mm
to 2mm depends on radiation level, the lead sheets
extend the full width and height of the door, Lead
thickness is equal to the shielding in the adjacent wall,
the door frames and door shutters are coated with
polyester powders of Pure polyester/ epoxy polyester
or polyurethane powder for powder coating of
thickness 60 – 65 microns, coated with Zinc Phosphate
Primer to receive any paint on site or finished with
Thermosetting Polyurethane paint of Aliphatic Grade
providing high levels of scratch resistance and
durability, hardware with Stainless Steel Ball Bearing
Butt Hinges 3 mm thick fixed flush to the frame and
shutter etc complete for finished item
493 TBSC-L.III-26 Supply & Fixing of Lead Lined Stainless steel Clean room
door frames and shutters made of Stainless steel grade
of 304 hairline finish, frame with 1.60mm (16SWG)
thick hairline finish Stainless steel grade of 304 formed
to Single/double rebate profile of size 100 mm x 58mm/
143 x 58 mm, door frames with a single / multi Layer of
Lead sheet varying thickness from 3mm /1mm to 2mm
depends on radiation level, the shutter with 1.2 mm
thick hairline finish Stainless steel grade of 304 formed
to provide a 46mm thick fully flush, double skin door
shell with Lock Seam joints at stile edges with a single /
multi Layer of Lead sheet varying thickness from 3mm
/1mm to 2mm depends on radiation level. The lead
sheets extend the full width and height of the door. Lead
thickness is to be equal to the shielding in the adjacent
wall. Hardware can be provided with Stainless Steel Ball
Bearing Butt Hinges 3 mm thick fixed flush to the frame
and shutter etc complete for finished item of work
494 TBSC-L.III-27 Providing of Factory made prelaminated FPVC (Foamed Polyvinyl Chloride)
Door frame of the size 105x40mm with a wall thickness of 10mm made out of
extruded rigid FPVC profile mitre joined with 6 Nos. of 50mm long screw. The
door frame shall be fixed to the wall by using 80mm long screws through the frame
with the help of PVC fasteners of 3 no's to be provided for each vertical member, GI
stiffeners of ("U" channel of size 29x9x1mm, 150mm long) -3 no's at hinge point,
Frame reinforcement of("U" GI channel of size 46x22x.06mm),Bottom tie rod of
("U" GI channel size of 15x15x1mm) etc. complete as per manufacturers
specification for finished item of work. Maximum door frame size : 980
x 2070 including providing of 35mm thick Factory made Prelaminated ABS
(Acrolynitrile Butadyne Styrene) Door shutter moulded in different designs,
consisting of all round Frame made out of water proof solid foam PVC bar of
size 20x32mm, reinforced by 32x 32mm - 2 nos. for vertical made out of
LVL (Laminated Veneer Lumber), core material of 32 mm thick high density craft
paper honey comb board, sandwiched on both sides with prelaminated ABS
sheet thickness of 1.5mm . PVC edge banding of size 0.45mm on the vertical
495 TBSC-L.III-28 Providing of Factory made prelaminated FPVC (Foamed Polyvinyl Chloride) Door
frame of the size105x40mm with a wall thickness of 10mm made outof extruded rigid
FPVC profile mitre joined with 6 Nos. of 50mm long screw. The door frame shall
befixed to the wall by using 80mm long screws through the frame with the help of PVC
fasteners of 3 no's to be provided for each vertical member, GI stiffeners of ("U"
channel of size 29x9x1mm, 150mm long) -3 no's at hinge point, Frame reinforcement
of("U" GI channel of size 46x22x.06mm),Bottom tie rod of ("U"GI channel size of
15x15x1mm) etc. complete as per manufacturers specification for finished item of
work. Maximum door frame size : 980 x 2070 including providing of 35mm thick
Factory made Prelaminated ABS (Acrolynitrile Butadyne Styrene) Door shutter
moulded in different designs, consisting of all round Frame made out of water proof
solid foam PVC bar of size 20x32mm, reinforced by 32x 32mm - 2 nos. for vertical
made out of LVL (Laminated Veneer Lumber), core material of 32 mm thick high
density craft paper honey comb board, sandwiched on both sides with prelaminated
ABS sheet thickness of 1.5mm . PVC edge banding of size 0.45mm on the vertical
sides. Hardware made out of steel coated butterfly hinges - 3 Nos. for each shutter
and ISI make S.S round lock completes for finished item of work. Maximum shutter
496 TBSC-L.III-29 size of : 910 xand
Supplying 2030fixing
mm of Unplasticised Poly Vinyl Chloride (UPVC) sliding
doors three track - three glass shutters sliding duly manufactured using UPVC
reinforced profiles of 108.0 mm x 49 mm x 2.25 mm for outer frames, 85 mm x
41 mm x 2.25 mm for sliding door shutter frames capable of mounting
single glazing system, structurally reinforced with reinforced with 35mm x 10mm
x 1.5mm thick with hot dip galvanized up to 50 microns of minimum thickness
of 1.2 mm prefabricated & welded through fusion welding the window sash shall be
fitted with 5 mm thick clear float glass of reputed make and fixed with with uPVC
glazing bead of 22.5mm x 18mm with “C” or “R” type inner and outer
EPDM weathering seal resistant accessories like clipping locking system made
of aluminium 1 No., per set of sashes and the system is to be installed at the
site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at
site etc., including cost and conveyance of all materials, accessories,
labour charges for transportation, erection at site with templates for
casement sizing complete for finished item of work
496 TBSC-L.IV-03 Supply and fixing of PVC cupboards for kitchen and
bedrooms shall be made out of multi chambered PVC
sections having overall dimensions of 20 X 762mm with
a wall thickness of 1.2mm ± 0.3mm. The cabinets shall
be made as per the requirements of the room with
groove system. The PVC section surface shall be plain
and laminated finish to have good look, completed, for finished item of work for
PVC CABINETS
TBSC-L.IV-04 Supply and fixing of cupboard shutter using teakwood scantling of size 50 mm x 50
mm teakwood as outer frame and 50 mm x 30 mm of size teakwood for shutter
frames, 8mm thick Bison Lam as panel to each shutter consist of 2 Nos 75mm long
tower bolt –2 nos 75 mm big handle the and other shutter will have 1 no of cupboard
lack , 1 No of 75 mm long handle and 75 mm x 10mm x 1mm thick SS hinges- 2 Nos
for each shutter. The above frame will be fixed to the wall with screws, the rate
inclusive of screws,handle, etc., complete at site of work
M SECTION WINDOWS
(Landing cost - including cost of conveyance, loading & unloading)
I SUB-SECTION OPENABLE WINDOWS
497 TBSC-M.I-01 Supply and fixing of pre-painted steel casement/ openable windows base steel as
per IS 513 of - 0.58 mm thick 'D quality, galvanized as per IS 277, finish painted
with a polyester paint, section for outer frame of 46 x 52 mm section for shutter of
46 x 46 mm section for mullion 46 x 70 mm, and section for beading 18 x 25mm
panelled with 5mm thick plain float glass fitted with EPDM gaskets,handle made of
high grade aluminium powder coated frames fixed to the concrete / masonry wall
by means of self expanding screws including 10 mm square guard bars @ 150 mm
pitch for Windows: Double shutter for sizes 2'0 x 4'0 (609.6 x1219.2 mm ) 3'-0
x 4'-0 (914.4mm x 1219.2 mm) without mullion section
498 TBSC-M.I-02 Supply and fixing of pre-painted steel casement/ openable windows base steel as
per IS 513 of - 0.58 mm thick 'D quality, galvanized as per IS 277, finish painted
with a polyester paint, section for outer frame of 46 x 52 mm section for shutter of
46 x 46 mm section for mullion 46 x 70mm, and section for beading 18 x
25 mm panelled with 5 mm thick plain float glass fitted with EPDM gaskets,
handle made of high grade aluminium powder coated frames fixed to the
concrete /masonry wall by means of self expanding screws including 10
mm square guard bars @ 150 mm pitch for Windows: Double shutter with mullion
section for sizes 3'-0 x 4'-0 (914.4mm x 1219.2 mm) and 4'-0 x 4 '-0
(1219.2x1219.2mm)
499 TBSC-M.I-03 Supply and fixing of pre-painted steel casement/ openable windows base steel as
per IS 513 of - 0.58 m thick 'D quality, galvanized as per IS 277, finis painted with
a polyester paint, section for outer frame of 46 x 52mm section for shutter of 46 x 46
mm section for mullion 46 x 70 mm, and section for beading 18 x 25 mm panelled
with 5 mm thick plain float glass fitted with EPDM gaskets, handle made of high
grade aluminium powder coated frames fixed to the concrete /masonry wall by
means of self expanding screws including 10 mm square guard bars @ 150 mm
pitch for Windows: Double shutter 4'-0 x 4 '-0 (1219.2x12.19.2mm) without Mullion
section
507 TBSC-M.I-11 Providing & Fixing of Openable Windows with Fly-mesh made of pre-painted steel as
per IS 513 of 0.58 mm thick galvanized as per IS 277 finish painted with a polyester
paint and the section for outer frame of 72 x 55mm, centre mullion of 72 x
50mm, section for fixed glass beading section of 12 x 12 mm and section for
shutters of 48 x 25 mm and outer frame & mullion sections with rebate for glazed
shutters, fly mesh and a 20 mm provision for guard bars/grills and fly mesh
shutter section of 20 x 40 mm, stay, handles, latch 2 Nos of heavy duty
stainless steel pivot hinges per shutter and panelled with 5mm thick plain float
glass and S.S. Mesh for fly mesh shutter (304 grade), fitted using rubber
gaskets including fixing the windows in the concrete /masonry wall by means of
self expanding screws, including 10mm Square guard bars with 6” (152.4mm)
pitch , complete for a size 6’0”x4’0” (1828.8mm x1219.2mm)
532 TBSC-M.II-12
533 TBSC-M.II-13 Providing and Fixing Pre painted Steel Sliding Windows / Doors - 3 track
sliding window /doors shutter with mesh shutter – (2 - glass shutters and 1 -
mesh shutter) fabricated from Roll formed sections made of galvanized Steel
colour coated/powder coated (Base Steel as per IS 513 ‘D’ quality,
galvanized as per IS 277 with zinc of 120 GM/Sq.mtr) with total coated thickness
of 0.58mm. Primer coat with epoxy primer of 5-7 microns thick, finish
painted with a polyester paint of 12-16 microns thick and back coated with Alkyd
backer of 5-7 microns or powder coated with pure polyester powder up to 50- 60
microns thick. Section for external frame should be of 44 x 107mm .Section for
glass shutter and mesh shutter in case of door should be of 35 x 67 mm
Section for euro groove should be 25 x 31mm (Aluminium/ Plastic) (in
case of window sections should be 35 x 49 mm and 25 x 24 mm and 30 x 41
mm) and Lap Strip should be of 39 x 41mm (30 x 41 mm & Touch lock for window )
(Aluminium/ Plastic. The doors/ windows should be panelled with 5mm thick
plain float glass. Corner bracket for internal and external frame made of
glass filled nylon. Gaskets are to be made of Ethyl Propylene Diamine
Monomer (EPDM).The sections are to be cut to length, joined and
assembled by means of corner bracket. The above frames should be fixed to
534 TBSC-M.II-14 Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) 2 Track–2
Panel Sliding windows duly manufactured using UPVC reinforced profiles of 60
mm x 49 mm x 2.20 mm for outer frames, 62 mm x 41 mm x 2.20 mm for
sliding shutter frames capable of mounting single glazing system,
structurally reinforced with 30 mm 15 mm x 1.5 mm with hot dip galvanized up
to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded
through fusion welding. The window sash shall be fitted with 5 mm thick clear
float glass of reputed make duly fixed with Grey colour TPV Gasket for
sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System
shall have single point locking with Touch Lock and the system is to be installed
at the site using anchor fasteners, silicon
rubber sealant, easy glazing/ deglazing at site etc., including cost and
conveyance of all materials, accessories, labour charges for
transportation, erection at site complete for finished item of work.
535 TBSC-M.II-15 Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) 2 Track–2
Panel Sliding windows with mesh duly manufactured using UPVC reinforced
profiles of 91 mm x 49 mm x 2.20 mm for outer frames, 62 mm x 41 mm
x 2.20 mm for sliding shutter frames capable of mounting single glazing
system, structurally reinforced with 30 mm 15 mm x 1.5 mm with hot dip galvanized
up to 50 microns of minimum thickness of 1.0/1.2 mm and the shutter of fly
screen with fibre mesh shall be made of size 21mm x 58mm extruded
uPVC window profile section of white colour having outer wall thickness of
2.2mm (± 0.3mm) provided with reinforcement of minimum 1.5mm thick
G/J/U/S/O type GI section duly mitred cut and thermal welded at all corners
and prefabricated & welded through fusion welding. The window sash shall be
fitted with 5 mm thick clear float glass of reputed make & Glazing bead
shall be co-extruded with Grey colour soft PVC. System shall have single
point locking with Touch Lock and the system is to be installed at the site
using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site
etc., including cost and conveyance of all materials, accessories, labour
III SUB-SECTION VENTILLATORS
533 TBSC-M.III-01 Supply and fixing of pre-painted steel top hung and fixed
louvered ventilators made of pre - painted steel as per
IS 513 of -0.58 mm thick 'D quality, galvanized as per IS
277, finish painted with a polyester paint & 4 mm
pinhead glass for ventilators with EPDM Gasket with
handle made of high grade aluminium powder coated
and nylon receiver, corner brackets made of CRCA with
Zinc Phosphate, Mullion caps made of glass filled nylon,
frames fixed to the concrete /masonry wall by means of
self expanding screws including 10 mm square guard
bars with 6 pitch complete for finished item of work for
(i) Ventilators: Top Hung 2 '-0 x 2'-0 (609.6x609.6mm)
outer frame section size of 46mm x 52 mm shutter
frame section size of 46mm x 46 mm and (ii)
Ventilators: Top Hung 4 '-0 x 2'-0 (1219.2x609.6mm)
outer frame section size of 46 x 52 m shutter frame
section size of 46 x 46 mm Mullion section size of 46 x
70 mm and (iii) Ventilators: Top Hung 4 '-0 x 3'-0
(1219.2x914.4mm) outer frame section size of 46 x 52m
m shutter frame section size of 46 x 46 mm Mullion
section size of 46 x 70 mm
534 TBSC-M.III-02 Supply and fixing of pre-painted steel top hung and fixed
louvered ventilators made of pre - painted steel as per
IS 513 of -0.58 mm thick 'D quality, galvanized as per IS
277, finish painted with a polyester paint & 4 mm
pinhead glass for ventilators with EPDM Gasket with
handle made of high grade aluminium powder coated
and nylon receiver, corner brackets made of CRCA with
Zinc Phosphate, Mullion caps made of glass filled nylon,
frames fixed to the concrete /masonry wall by means of
self expanding screws including 10 mm square guard
bars with 6 pitch complete for finished item of work for
(i) Ventilators: Fixed louvers 2'-0 x 2'-0
(609.6x609.6mm)(Box section) outer frame section size
of 33 x 56 mm and (ii) Ventilators: Fixed louvers 4'-0 x
2'-0 (1219.2 x 609.6 mm) (Box section) outer frame
section size of 33 x 56 mm Mullion section size of 33 x
56 mm and (iii) Ventilators: Fixed louvers 4'-0 x 3'-0
(1219.2 x 914.4 mm) (Box section) outer frame section
size of 33 x 56 mm Mullion section size of 33 x 56 mm
545 TBSC-N.I-05 Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) Fixed
Glazing/ Window duly manufactured using UPVC reinforced profiles of 60
mm x 60 mm x 2.60 mm for frames and the mullion sections are of 60 mm x 82
mm x 2.60 mm frames are structurally reinforced with hot dip galvanized up to 50
microns of size 35 mm x 28 mm of thickness 1.5 mm the sash shall be fitted
with 5 mm thick clear float glass of reputed make duly fixed with EPDM
weathering seal resistant and glazing bead 34.5 mm x 18 mm including cost
and conveyance of all materials, accessories, labour charges for
transportation, erection at site with templates for casement sizing complete for
finished item of work
615 TBSC-P.VI-03 Providing and fixing Aluminium Extruded Section Body Tubular Type Hydraulic
Door Closer (IS: 3564) with double speed adjustment with necessary
accessories and screws etc. complete (Type-2: for width of doors 701 to 850
mm)
616 TBSC-P.VI-04 Providing and fixing Aluminium Extruded Section Body Tubular Type Hydraulic Door
Closer (IS:3564) with double speed adjustment with necessary accessories and
screws etc. complete (Type-3: for width of doors 851 to 1000 mm)
620 TBSC-P.VII-04 Providing and fixing double action brass cast hydraulic
floor spring (IS:6315-Table 1) for doors including cost
of cutting floors as required, embedding in floors and
S.S. cover plates with brass pivot and single piece M.S.
Sheet outer box with slide plate etc. complete (door
weight capacity up to 80 Kgs)
621 TBSC-P.VII-05 Providing of brass cast body Floor Spring IS: 6315 sleek
in size with the S.S. / Brass Cover plates of Length 320
mm x Breadth 130 mm size along with the Top Patch,
Bottom Patch, Door Lock and Pivot with Double
Cylinder etc. complete for Heavy duty Glass doors.
VIII SUB-SECTION MORTICE LOCKS
622 TBSC-P.VIII-01 Heavy duty mortice lock 6/7 levers (IS:2209) with PC or
CP handles complete set
623 TBSC-P.VIII-02 Heavy duty mortice lock 6/7 levers (IS:2209) with brass
heavy handles
IX SUB-SECTION OTHER ACCESSORIES
624 TBSC-P.IX-01 Brass Door Stoppers
625 TBSC-P.IX-02 MS-Powder Coated - Door Stoppers
626 TBSC-P.IX-03 Heavy duty Aluminium Door stopper
627 TBSC-P.IX-04 Rubber/ Nylon door stop bushes
628 TBSC-P.IX-05 Supply & fixing drapery rods (25.4 mm) 1" x 21 G
Powder coated with PVC rings
629 TBSC-P.IX-06 Supply & fixing drapery bracket - brass powder coated
630 TBSC-P.IX-07 Nylon rollers for sliding glasses/ alluminium windows
631 TBSC-P.IX-08 MS Z Hold fasts - 300 mm long of 40 x 40 x 5 mm ISA
632 TBSC-P.IX-09 Magnetic Catchers
Q SECTION CONSTRUCTION CHEMICALS & ADMIXTURES
Approved brands, area of application, dosage etc have been appended to
this SoR for the guidance for preparation of estimates only. However,
literature for usage/ application of construction/ water proofing
materials, epoxies etc, may be obtained from the manufacturers, while in
execution.
I SUB-SECTION PLASTICIZERS
633 TBSC-Q.I-01 Concrete Plasticizers and Water reducing admixture Conforming to IS:9103-1999
634 TBSC-Q.I-02 Early High Strength, High water retention, polycarboxylic plasticizers Conforming to
IS:9103-1999
635 TBSC-Q.I-03 High performance super plasticizer and water reducing
admixture Conforming to IS: 9103-1999
636 TBSC-Q.I-04 Super plasticizer for high range water reducing
admixture Conforming to IS: 9103-1999
637 TBSC-Q.I-05 Super plasticizer, high range water reducing and
retarding admixture complying with IS: 9103-1999
638 TBSC-Q.I-06 Plasticizer for accelerator for sprayed concrete
Conforming to IS: 9103-1999.
639 TBSC-Q.I-07 High Early Strength Concrete Admixture for Road Repairs
II SUB-SECTION WATER PROOFING COMPOUNDS
639 TBSC-Q.II-01 Integral Cement Waterproofing Liquid Conforming to IS: 2645-2003
640 TBSC-Q.II-02 High durable cementitious acrylic based waterproofing systems
641 TBSC-Q.II-03 Acrylic Polymer Elastomeric Cementitious Water proof Coatings
642 TBSC-Q.II-04 Single component, elastomeric waterproof membrane coating
643 TBSC-Q.II-05 Quick setting, rapid hardening and water proofing compound Conforming to
IS: I.S. 2645-2003
644 TBSC-Q.II-06 Highly Flexible Water proof Acrylic Elastomeric bituminous Blended Coatings
645 TBSC-Q.II-07 Two part system of fibre reinforced Acrylic Cementitious Water proofing coating.
646 TBSC-Q.II-08 High strength cellulose fibre reinforced acrylic elastomeric liquid membrane
waterproof coating -
647 TBSC-Q.II-09 High Strength Acrylic Penetrative U,V. Resistant concrete road top coatings.
648 TBSC-Q.II-10 High performance polyurethane blended with bituminous Membrane coating
( Complies with ASTM C - 836 )
649 TBSC-Q.II-11 Nano Technology water based transparent silicon water repellent
Providing and applying Brushbond ( two component acrylic polymer modified
elastomeric waterproofing membrane which consists of Brushbond powder and
Brushbond liquid acrylic emulsion) for a minimum 2mm thickness coating. (Work shall
be executed as per manufacturer’s specification and instructions.
III SUB-SECTION BONDING AGENTS/ ADHESIVES
645 TBSC-Q.III-01 Acrylic based Bonding adhesive
646 TBSC-Q.III-02 Styrene butadiene rubber based bonding agent
647 TBSC-Q.III-03 Two Parts system of Epoxy Bonding adhesive Conforming to ASTM-C 881
648 TBSC-Q.III-04 Liquid Polymer additive for cement & concrete mixes
649 TBSC-Q.III-05 Polymer cementitious additive for fixing tiles/ stones etc
650 TBSC-Q.III-06 Highly multi purpose Roads Grade concrete bonding agent
IV SUB-SECTION ANTI-CORROSIVE AGENTS
648 TBSC-Q.IV-01 Acrylic based Anti corrosive coating
649 TBSC-Q.IV-02 Rust converter –rust encapsulating coating for steel
650 TBSC-Q.IV-03 High range of reinforcement / steel protector against
corrosion zinc rich epoxy resin primer
651 TBSC-Q.IV-04 Anti corrosion CRPPC (Corrosion Resistant) inhibitive admixture
V SUB-SECTION GROUTS
652 TBSC-Q.V-01 High Power Polyester Resin Anchor Grout Conforming to ASTM-827
653 TBSC-Q.V-02 Non-shrink Free flow high strength precision grout Conforming to BS 1881 Part
1161983.
654 TBSC-Q.V-03 Low viscosity Epoxy resin injection grout
655 TBSC-Q.V-04 Three component epoxy grout Conforming to IS: ASTM 827 (Three components)
656 TBSC-Q.V-05 Expansive acqua -reactive water barrier and grouting
VI SUB-SECTION MISCELLANEOUS CHEMICALS
656 TBSC-Q.VI-01 Mould / Shutter releasing oil
657 TBSC-Q.VI-02 Non oxidizing, heavy duty metallic Floor Hardeners
658 TBSC-Q.VI-03 Non-metallic Floor Hardeners
659 TBSC-Q.VI-04 High Strength, Non shrink Micro Concrete for structural repair product.
660 TBSC-Q.VI-05 Structural graded polymer modified reinstatement concrete / mortar(Two Part System)
681 TBSC-Q.VII-08 Pressure grouting the drilled holes with neat cement
slurry or with approved epoxy bonding agent using
pump
682 TBSC-Q.VII-09 Providing multi-coloured silicon fluorocarbon spray coating of thickness 1mm for
exterior & interior wall finishes to give Natural Granite appearance
comprising of 4 coats including application of primer, waterproof coat, Multi colour
texture & finally UV resistant with repellent clear coat of low VOC, non-
toxic, Green Building compliant material
683 TBSC-Q.VII-10 Providing and applying epoxy based anti skid coat over existing RCC/Concrete
flooring surfaces of 2mm thickness for wear & tear protection in three part
applications containing low solvent-coloured, epoxy resin based coating with
thyrotrophic properties specially formulated for application in Car Parks
having Mechanical / Physical Properties such as 1. Abrasion Resistance ~
0.8mm thickness loss (According to IS 1237 – 1980 and IS 9162 - 1979) 2.
Chemical Resistance to many chemicals 3.Thermal Resistance Exposure with Dry
heat Permanent +50°C
684 TBSC-Q.VII-11 Providing and applying epoxy resin based self levelling Conductive
Floor System of 2mm thick Antistatic (ESD) Flooring System comprising of
1 coat of Primer followed by Application of copper tape and 1 layer of SL
Conductive Undercoat and 1 layer of SL Conductive Top coat with Compressive
strength after 7 days at +30° C: 50 N/mm2 and Flexural strength after 7
days at +30° C: approx. 5N/mm2 and Tensile strength after 7 days at +30°
C: 16 N/mm2 with a Surface resistance When measured for surface
resistance in accordance with BS 2050: 1978 (A-1984) and DIN EN 1081, the
static Conductive topping including under coat shall be less than 25k Ω.
685 TBSC-Q.VII-12 Providing and applying food grade epoxy based water proof coat over
existing RCC/Concrete flooring surfaces in three part applications containing low
solvent-coloured, epoxy resin based coating with low VOC properties specially
formulated for food grade application for potable water storage tanks in
ambient temperatures
722 TBSC-R.I-29 U' Tracks & 'H' Section:- Bottom & Top 'U' Tracks are
made of 1.25 mm thick 120 GSM G.I. Sheet of
size24x51x26 mm size.
723 TBSC-R.I-30 G I ‘H’ Section is made up of forming width of 275
mm single sheet roll formed in the shape of “H”
section without any welding joint. 40mm width for
flanges and 51 mm for web to hold 50 mm Sandwich
panel
724 TBSC-R.I-31 Sandwich Panel joinery is made up of couplers or
equivalent made from 0.6 mm G.I. roll formed section
to hold 2 Nos of 10 mm board on both sides with 25
mm Thermocol in between.
725 TBSC-R.I-32 150 mm X 150 mm X 2.0 mm size M. S. Corner Cover
Plate
726 TBSC-R.I-33 Window:- windows are made up of 51 x51 mm step
'U' section made from 1.25 thick MS Cold rolled Steel
Sheet and Windows Shutters & Grill are made of
48x25mm mm size pre painted section with 4 mm
glass complete with necessary hardware. Grills are
made from 8 mm square rod at 100 mm spacing.
727 TBSC-R.I-34 Door Frames :-51 X 51 Stepped ' U' section made from 1.25 mm thick C.R.
section with a 32 mm rebate for 30 mm flush door and Door Shutters with 30 mm
thick block board / flush doors with boiling water proof plywood complete with
necessary Hard ware.
TBSC-R.I-35 Ventilators:- Ventilators are made of 51x51 mm step
728 'U' section made From 1.25 mm thick C.R. sheet with
fixed louvers and glass.
729 TBSC-R.I-36 Painting:-1) Steel structure is to be painted with 2
coats of Grade I enamel paint.
730 TBSC-R.I-37 2) Exterior walls are painted with one coast of
primer and 2 coats of exterior emulsion paint .
731 TBSC-R.I-38 3) Interiors are painted with 1+2 coat of O.B.D.
TBSC-R.I-39 Toilets: - Toilets are provided as per plan with a
provision for fixing the wash basin, W.C. etc only is
732 made with M.S. steel section secured to the walls
with toilet bracket provision excluding cost of WC/
Wash basin etc
TBSC-R.I-40 Sun shades: - Sun shades will be provided wherever
necessary with 300 mm more than the width of
window. 25x25 mm angle frame to cover 450 mm in
733 the front and the sides. 10mm cement bonded
particle board will be fixed on the frame work and
sealed with green paste or equivalent.
TBSC-R.I-41 Roofing: - Roofing will be provided with 0.5mm thick
galvanized / pre painted G.I. profiled sheets fixed to
the purlins with 14 size self drilling screws with
734 neoprene washer. Side laps are stitched with self
tapping / drilling screws. End laps are to be sealed
with 25x3 mm Butyl tape. The sheets are provided
with anti capillary grove.
805 TBSC-T.I-50 Labour charges for wrought and put up including fixing in position for Other than
teakwood Swing ventilators glazed including outer frame and shutter frame
806 TBSC-T.I-51 Labour charges for wrought and put up including fixing in position for Other than
teakwood Weld mesh doors and windows including outer frame and shutter frame
807 TBSC-T.I-52 Labour charges for wrought and put up including fixing in position for Other than
teakwood G.I or .AC sheet door & windows including outer frame and
shutter frame
808 TBSC-T.I-53 Dressing faces of granite stone (double line dressing)
809 TBSC-T.I-54 Dressing faces of other than granite stone(double line dressing)
820 TBSC-T.I-55 Labour charges for removing and refixing with complete servicing of the MS Windows
U SECTION DISMANTLING
810 TBSC-U.I-01 Stone masonry in cement mortar
811 TBSC-U.I-02 Terracing work in roofs or floors
812 TBSC-U.I-03 Flat stones in roof or floors including lifting
813 TBSC-U.I-04 Pan tiled or Mangalore tiled roof without roof timbers.
814 TBSC-U.I-05 Flat and pan tiles or Mangalore tiles over flat tiles without roof timbers
815 TBSC-U.I-06 Wrought and framed timber in roofs or floors
816 TBSC-U.I-07 Old lime mortar plaster
817 TBSC-U.I-08 Old cement mortar plaster
818 TBSC-U.I-09 Dry rough stone revetment for aprons and stacking within 40 M lead
819 TBSC-U.I-10 Revetment for aprons and stacking grouted within 40 lead
820 TBSC-U.I-11 Kadapa slabs or Shahabad stone slabs flooring on sand bed
821 TBSC-U.I-12 Through scraping of old plastered surface
822 TBSC-U.I-13 Washing of plastered surface with soap, soda and water (or with soda lime and
water)
823 TBSC-U.I-14 Clean removal of lime plaster from walls and raking out joints 20 mm deep or from
terraced roof and raking out joints up to 50 mm deep
824 TBSC-U.I-15 Clean removal of cement plaster from walls and raking out joints 20 mm deep or
from terraced roof and raking out joints from 50 mm to 100 mm deep
S - SoR : 2018 - 2019
CIVIL ITEMS
SS Rate for 2018-
19
Each
5.70
Each
6.70
Each
25.00
Each
23.00
Each
20.00
Each
14.00
Each
8.00
Each
15.00
Each
12.00
Each
24.00
Each
19.00
Each
20.00
Each
11.00
Each
6.00
Each
12.00
Each
11.00
Each
47.00
Each
69.00
Each
93.00
Each
106.00
Sqm 95.00
Sqm 123.00
Sqm
164.00
Sqm 95.00
Sqm 110.00
Sqm 137.00
Sqm 164.00
Sqm
382.00
Sqm
273.00
Sqm
661.00
Sqm
534.00
Sqm
907.00
Sqm 432.00
Sqm
3118.00
Sqm
2709.00
Sqm 2303.00
Sqm 1057.00
Sqm
300.00
Sqm
310.00
Sqm
485.00
Sqm
485.00
Sqm
Sqm
421.00
Sqm
421.00
Sqm
500.00
Sqm
550.00
Sqm
600.00
Sqm
700.00
Sqm
650.00
Sqm
800.00
Sqm
1000.00
Sqm
750.00
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
300.00
Sqm
400.00
Sqm
550.00
Sqm
550.00
Sqm
500.00
Sqm
500.00
Sqm
550.00
Sqm
650.00
Sqm
Sqm
Sqm
Sqm
300.00
Sqm
152.00
Sqm
317.00
Sqm
160.00
Sqm
633.00
Sqm
320.00
Sqm
Sqm
Sqm
Sqm
550.00
Sqm
480.00
Sqm
520.00
Sqm
Sqm
261.00
Sqm
278.00
Sqm
285.00
Sqm
245.00
Sqm
258.00
Sqm
261.00
Sqm
274.00
Sqm
285.00
Sqm
300.00
Sqm
427.00
Sqm
449.00
Sqm
304.00
Sqm
328.00
Sqm
470.00
Sqm
518.00
Sqm
589.00
Sqm
181.00
Sqm
771.00
Sqm
528.00
Sqm
383.00
Cum 72620.00
Cum 80689.00
Cum 88759.00
Cum 1,45,240.00
Cum 1,25,068.00
Cum 1,33,137.00
Cum 1,41,206.00
Cum 1,57,344.00
Cum 1,71,857.00
Cum 1,76,765.00
Cum 1,85,920.00
Cum 2,01,319.00
Cum 46071.00
Cum 66803.00
Cum 44785.00
Cum 59715.00
Sqm 220.00
Sqm 158.00
Sqm 164.00
Kg
60.00
Sqm
387.00
Sqm
377.00
Sqm
339.00
Sqm
319.00
Rmt
260.00
Rmt
232.00
Sqm
300.00
Sqm
380.00
Sqm
1276.00
Rmt
127.00
Each 5.00
Each 6.00
Each 6.00
Each 10.00
Each 2.00
Each 2.00
Each
2.00
Sqm
3890.00
Sqm
3403.00
Sqm
160.00
Sqm
160.00
Sqm
160.00
Sqm
218.00
Sqm
218.00
Sqm
218.00
Sqm
249.00
Sqm
249.00
Sqm
249.00
Sqm 19.00
Kg 61.00
Kg 61.00
Kg 61.00
Kg
90.00
Kg
90.00
Sqm 236.00
Sqm
519.00
Sqm
411.00
Sqm
351.00
Sqm
261.00
Sqm
626.00
Sqm
519.00
Sqm
428.00
Sqm
334.00
Kg
387.00
Sqm 522.00
Sqm 400.00
Sqm 507.00
Sqm 629.00
Sqm 845.00
Sqm 890.00
Sqm 1067.00
Sqm 300.00
Sqm 390.00
Sqm 467.00
Sqm 584.00
Sqm 700.00
Sqm 1002.00
Sqm 1168.00
Sqm 1402.00
Sqm 539.00
Sqm 678.00
Sqm 812.00
Sqm 938.00
Sqm 1251.00
Sqm 1500.00
Sqm 1749.00
Kg 150.00
Kg 191.00
Kg 41.00
Kg
64.00
liter 129.00
liter 185.00
liter 144.00
Kg 144.00
Kg 144.00
Kg 103.00
liter 144.00
liter 101.00
liter 58.00
liter 133.00
liter 272.00
liter 188.00
Kg 572.00
Kg 224.00
liter 516.00
Kg 22.00
Kg 43.00
Kg 82.00
Kg 51.00
liter
195.00
liter
204.00
liter
225.00
liter
245.00
liter
430.00
liter
251.00
liter
191.00
Kg
37.00
Kg
47.00
liter 317.00
liter 645.00
liter 788.00
liter 258.00
Sqm 613.00
Sqm 696.00
Sqm 806.00
Sqm 914.00
Sqm 1519.00
Sqm 706.00
Sqm 806.00
Sqm 933.00
Sqm 1033.00
Sqm 1941.00
Sqm 229.00
Sqm 338.00
Sqm 431.00
Sqm 279.00
Sqm 398.00
Sqm 354.00
Sqm 373.00
Sqm 423.00
Sqm 566.00
Sqm 720.00
Sqm 803.00
Sqm 1140.00
Sqm 1377.00
Sqm 1503.00
Sqm 507.00
Sqm 590.00
Sqm 782.00
Sqm 983.00
Sqm 1100.00
Sqm 1466.00
Sqm 1825.00
Sqm 2156.00
Sqm 342.00
Sqm 389.00
Sqm 481.00
Sqm 578.00
Sqm 880.00
Sqm 1040.00
Sqm 447.00
Sqm 481.00
Sqm 631.00
Sqm 792.00
Sqm 1040.00
Sqm 1200.00
Sqm 536.00
Sqm 606.00
Sqm 705.00
Sqm 792.00
Sqm 1145.00
Sqm 1221.00
Sqm 616.00
Sqm 692.00
Sqm 783.00
Sqm 916.00
Sqm 1221.00
Sqm 1297.00
Sqm 612.00
Sqm 692.00
Sqm 792.00
Sqm 995.00
Sqm 1221.00
Sqm 1297.00
Sqm 692.00
Sqm 783.00
Sqm 926.00
Sqm 1012.00
Sqm 1281.00
Sqm 1374.00
Sqm 145.00
Sqm 207.00
Sqm 266.00
Sqm 306.00
Sqm 382.00
Sqm 426.00
Sqm 485.00
Sqm 550.00
Sqm 583.00
Sqm 225.00
Sqm 303.00
Sqm 382.00
Sqm 464.00
Sqm 625.00
Sqm 752.00
Sqm 952.00
Sqm 1142.00
Sqm 1523.00
Sqm 526.00
Sqm 568.00
Sqm 610.00
Sqm 667.00
Sqm 741.00
Sqm
971.00
Sqm
1166.00
Sqm 369.00
Sqm 408.00
Sqm 479.00
Sqm 479.00
Sqm 601.00
Sqm 885.00
Sqm 867.00
Sqm 422.00
Sqm 495.00
Sqm 617.00
Sqm 583.00
Sqm 762.00
Sqm 1093.00
Sqm 1097.00
Sqm
546.00
Sqm
711.00
Sqm
912.00
Sqm
1161.00
Sqm
1190.00
Sqm
1387.00
Sqm 366.00
Sqm 524.00
Sqm 575.00
Sqm 389.00
Sqm 541.00
Sqm 583.00
Sqm 409.00
Sqm 752.00
Sqm
255.00
Sqm
249.00
Sqm 225.00
Sqm
535.00
Sqm
626.00
Sqm
674.00
Sqm 235.00
Sqm 126.00
Sqm 189.00
Sqm 251.00
Sqm 314.00
Sqm 376.00
Sqm 439.00
Sqm 503.00
Sqm 564.00
Sqm 628.00
Sqm 185.00
Sqm 272.00
Sqm 209.00
Sqm 279.00
Sqm 349.00
Sqm 418.00
Sqm 24.00
Sqm 42.00
Sqm
400.00
Sqm
333.00
Sqm
1140.00
Sqm
1224.00
Sqm
1359.00
Sqm
1403.00
Sqm
622.00
Sqm
677.00
Sqm
969.00
Rmt 67.00
Rmt 78.00
Rmt 77.00
Rmt 67.00
Rmt 38.00
Rmt 34.00
Rmt 50.00
Rmt 37.00
Rmt 45.00
Rmt 41.00
Rmt 42.00
Rmt 24.00
Rmt 31.00
Each 3.00
Each 3.00
Each 3.00
Each 3.00
Each 3.00
Kg 27.00
Rmt 5.00
liter 129.00
Each 3.00
Rmt 11.00
Rmt 10.00
Sqm
1642.00
Sqm
3169.00
Sqm
694.00
Sqm
765.00
Sqm
834.00
Sqm
836.00
Sqm
962.00
Sqm
1504.00
Sqm
2117.00
Sqm
1883.00
Sqm
1982.00
Sqm
1287.00
Sqm
1108.00
Sqm
1170.00
Sqm
1310.00
Sqm
1448.00
Sqm
3888.00
Sqm
1459.00
Sqm
1506.00
Sqm
1797.00
Sqm
1506.00
Sqm
1797.00
Sqm
2197.00
Sqm
3027.00
Sqm
3490.00
Sqm
2675.00
Sqm
2258.00
Sqm
1263.00
Sqm
4466.00
Sqm
5093.00
Rmt
343.00
Rmt
631.00
Rmt
295.00
Rmt
308.00
Rmt
231.00
Rmt
182.00
Rmt
199.00
Rmt
199.00
Rmt
225.00
Rmt
225.00
Rmt
688.00
Rmt
431.00
Rmt
389.00
Rmt
300.00
Rmt
390.00
Rmt
227.00
Sqm
1731.00
Sqm
1817.00
Sqm
1984.00
Sqm
987.00
Sqm
1192.00
Sqm
1349.00
Sqm
1528.00
Sqm
1901.00
Sqm
1848.00
Sqm
2046.00
Sqm
2231.00
Sqm
2550.00
Sqm
2222.00
Sqm
2822.00
Sqm
2174.00
Sqm
1496.00
Sqm
1281.00
Sqm
2367.00
Sqm
1491.00
Sqm
1630.00
Sqm
1211.00
Sqm
1341.00
Sqm
2630.00
Sqm
1342.00
Sqm
6185.00
Sqm
2382.00
Sqm
2142.00
Sqm
2448.00
Sqm
2222.00
Sqm
2245.00
Sqm
1995.00
Sqm
1762.00
Sqm
3486.00
Sqm
5669.00
Sqm
6377.00
Sqm
7048.00
Sqm
6103.00
Sqm
7989.00
Sqm
941.00
Sqm
1744.00
Sqm
2748.00
Sqm
2362.00
Rmt
545.00
Sqm
11110.00
Sqm
10256.00
Sqm
10940.00
Sqm
20830.00
Sqm
13193.00
Sqm
12499.00
Sqm
20830.00
Sqm
18161.00
Sqm
14956.00
Sqm
23608.00
7605.00
3410.00
8306.00
Sqm
2131.00
Sqm
3502.00
Sqm
3934.00
Sqm
3928.00
Sqm
6300.00
Sqm
6664.00
Sqm
6481.00
Sqm
5937.00
Sqm
5755.00
Sqm
6118.00
Sqm
5391.00
Sqm
7632.00
Sqm
7996.00
Sqm
7270.00
Sqm
6361.00
Sqm
4753.00
Sqm
5075.00
Sqm
5395.00
Sqm
4753.00
Sqm
6731.00
Sqm
7051.00
Sqm
6411.00
Sqm
5670.00
Sqm
5080.00
Sqm
7124.00
Sqm
6549.00
Sqm
5867.00
Sqm
7032.00
7236.00
7,236.00
7236.00
7236.00
7236.00
Sqm
6765.00
Sqm
5289.00
Sqm
5865.00
Sqm
6195.00
Sqm
6784.00
Sqm
5556.00
Sqm
6080.00
Sqm 6,080.00
Sqm
6375.00
Sqm
5980.00
Sqm 6,657.00
Sqm Deleted
7481.00
6557.00
7590.00
Sqm
6907.00
Sqm
4725.00
Sqm
6088.00
Sqm
4167.00
Sqm
7532.00
Sqm
5075.00
Sqm 5,990.00
Sqm 8,428.00
Sqm
5997.00
Sqm
5089.00
Sqm
2938.00
Sqm
3511.00
Sqm
4403.00
Sqm
7270.00
Sqm 5,875.00
Sqm
6259.00
Each 161.00
Each 236.00
Each 315.00
Each 391.00
Each 481.00
Each 44.00
Each 52.00
Each 66.00
Each 79.00
Each 96.00
Each 109.00
Each 288.00
Each 376.00
Each 24.00
Each 35.00
Each 52.00
Each 68.00
Each 85.00
Each 84.00
Each 98.00
Each 147.00
Each 196.00
Each 245.00
Each 293.00
Each 66.00
Each 218.00
Each 264.00
Each 348.00
Each 49.00
Each 64.00
Each 77.00
Each 93.00
Each 11.00
Each 21.00
Each 31.00
Each 40.00
Each 131.00
Each 203.00
Each 213.00
Rmt
32.00
Each 41.00
Each 300.00
Each 63.00
Each 93.00
Each 119.00
Each 148.00
Each 44.00
Each 52.00
Each 74.00
Each 87.00
Each 31.00
Each 45.00
Each 304.00
Each 412.00
Each 743.00
Each 948.00
Each 1483.00
Each 316.00
Each 836.00
Each 64.00
Each 96.00
Each 114.00
Each 140.00
Each 157.00
Each 1164.00
Each 2243.00
Each 3194.00
Each 166.00
Each 192.00
Each 210.00
Each 105.00
Each 137.00
Each 164.00
Each 236.00
Each 279.00
Each 306.00
Each 584.00
Each 672.00
Each 886.00
Each 96.00
Each 105.00
Each 114.00
Each 53.00
Each 66.00
Each
939.00
Each
1086.00
Each
1162.00
Each
1220.00
Each
1734.00
Each
4114.00
Each
3435.00
Each
2554.00
Each
11346.00
Each
848.00
Each
2181.00
Each 180.00
Each 45.00
Each 58.00
Each 10.00
Rmt
116.00
Pair 410.00
Each 14.00
Each 32.00
Each 14.00
Ltr
182.00
Kg
128.00
Kg
86.00
Kg
96.00
Kg
105.00
Kg
78.00
26.00
Ltr 191.00
Kg 122.00
Ltr 318.00
Ltr 386.00
Ltr
73.00
Ltr 272.00
Kg 131.00
Ltr
279.00
Ltr 306.00
Ltr
568.00
Ltr 655.00
sqm
200.00
Ltr 136.00
Kg 409.00
Kg 790.00
Ltr 218.00
Kg 197.00
Ltr 197.00
Ltr 318.00
Ltr 436.00
Kg
680.00
Ltr 314.00
Kg 272.00
Kg
31.00
Kg 726.00
Kg 146.00
Kg 941.00
Ltr 132.00
Kg 34.00
Kg 28.00
Kg 33.00
Kg
78.00
Kg 862.00
Kg 327.00
No. 662.00
Kg 409.00
Kg 304.00
Kg 78.00
Ltr 590.00
Kg 318.00
Kg 91.00
Kg 109.00
Kg 78.00
Ltr 109.00
Ltr 207.00
Kg
262.00
Kg
393.00
Kg
87.00
Kg 42.00
Sqm
270.00
Sqm
374.00
Sqm
509.00
Sqm
405.00
Sqm
374.00
Sqm
592.00
Rmt
675.00
Each
52.00
1440.00
680.00
1400.00
280.00
Sqm
729.00
Sqm
818.00
Sqm
1022.00
Sqm
293.00
Sqm
366.00
Sqm
729.00
Rmt
12.00
Rmt
14.00
Rmt
17.00
Rmt
24.00
Rmt
30.00
Kg 29.00
Cum
608.00
Kg
292.00
Kg
30.00
Kg
18.00
Kg
211.00
Sqm
299.00
Sqm
760.00
Sqm
724.00
Sqm
1229.00
Rmt 3.00
Each 134.00
Each 31.00
Sqm
352.00
Sqm
402.00
Sqm
454.00
Sqm
2345.00
Sqm
2557.00
Sqm
2868.00
Sqm
343.00
Sqm
479.00
Sqm
562.00
Sqm 274.00
Sqm
1009.00
Rmt
395.00
Sqm
1987.00
Rmt
671.00
Rmt
1430.00
Rmt
155.00
Sqm
254.00
Sqm
301.00
Sqm
362.00
Sqm
4163.00
Sqm
3984.00
Sqm
4459.00
Each
113.00
Each
101.00
Sqm 88.00
Each
953.00
Each
3211.00
Each
725.00
Each 3.00
Each 3.00
Cum 3.00
Rmt
7.00
Rmt
8.00
Each 110.00
Each 274.00
Rmt 381.00
Each
46.00
64.00
Each
32.00
Each
78.00
Hr 279.00
Hr 130.00
Hr 121.00
Hr 140.00
Each
76.00
Each
126.00
Each 221.00
Each 11.00
Rmt 442.00
Sqm 1671.00
Kg 126.00
Each 135.00
Hr
356.00
Hr
5.00
Cum
269.00
Cum
318.00
Cum
371.00
Cum
427.00
Cum
664.00
Cum
802.00
Sqm
1134.00
Sqm
1696.00
Sqm
524.00
Rmt
117.00
Rmt
353.00
Rmt
458.00
Rmt
18.00
Rmt
55.00
Rmt 62.00
Kg
29.00
Kg
4.00
Kg
26.00
Kg
23.00
Kg
146.00
Sqm
1953.00
Sqm
1063.00
Sqm
1315.00
Sqm
1643.00
Sqm
426.00
Sqm
318.00
Sqm
2003.00
Sqm
1858.00
Sqm
1661.00
Sqm
1299.00
Sqm
938.00
Sqm
1254.00
Sqm
1932.00
Sqm
1320.00
Sqm
1577.00
Sqm
974.00
Sqm
1255.00
Sqm
670.00
Sqm
750.00
Sqm
1676.00
Sqm
1592.00
Sqm
1389.00
Sqm
1087.00
Sqm
854.00
Sqm
1078.00
Sqm
1616.00
Sqm
1105.00
Sqm
1319.00
Sqm
911.00
Sqm
1147.00
Sqm
587.00
Sqm
666.00
Sqm 195.00
Sqm 121.00
Sqm
415.00
Cum 442.00
Sqm 18.00
Sqm 16.00
Sqm 14.00
Sqm 16.00
Cum 230.00
Sqm 4.00
Sqm 5.00
Cum 72.00
Cum 54.00
Sqm 7.00
Sqm 4.00
Sqm
1.00
Sqm
4.00
Sqm
5.00
WATER SUPPLY & SANITARY ITEMS
1 2 3
A SECTION S.W.G. PIPES&FITTINGS
1 SUB-SECTION SUPPLY & LAYING OF S.W.G. PIPES
1 TBSP-A.I-01 Supplying, laying, jointing and testing 101.6 mm SWG SP-1 pipes of ISI make
conforming to ISI 651 & 4127 with airtight cement joints in CM 1.5:1
prop. Including excavation of trenches and socket pits in any soil (except
rock requiring blasting) up to 1524 mm(5'0") depth and refilling with watering
and tamping.
2 TBSP-A.I-02 Supplying, laying, jointing and testing 101.6 mm SWG SP-1 pipes of ISI make
conforming to ISI 651 & 4127 with airtight cement joints in CM 1:5:1 prop.
including excavation of trenches and socket pits in any soil (except rock requiring
blasting) up to 914.4 mm (3'0") depth and refilling with watering and tamping.
3 TBSP-A.I-03 Supplying, laying, jointing and testing 152.4 mm SWG SP-1 pipes of ISI make
conforming to ISI 651 & 4127 with air tight cement joints in CM 1.5:1 prop.
including excavation of trenches and socket pits in any soil (except rock
requiring blasting) up to 1524 mm(5'0") depth and refilling with watering and
tamping.
4 TBSP-A.I-04 Supplying, laying, jointing and testing 152.4 mm SWG SP-1 pipes of ISI make
conforming to ISI 651 & 4127 with airtight cement joints in CM1.5:1 prop.
including excavation of trenches and socket pits in any soil (except rock requiring
blasting) up to 914.4 mm (3'0")) depth and refilling with watering and tamping.
5 TBSP-A.I-05 Providing 152.4 mm CC bed 1:2:4 Prop: using 19.05 mm gauge graded granite
metal chips and cradling 101.6 mm SWG pipe line all round to have 75 mm
nominal size thick cover over the sockets including cost & conveyance of all
materials and all labour charges.
6 TBSP-A.I-06 Providing 152.4mm CC bed 1:2:4 Prop: using 19.05 mm gauge graded granite
metal chips and cradling 152.4 mm SWG pipe line all round to have 75 mm
nominal size thick cover over the sockets including cost & conveyance of all
materials and all labour charges.
7 TBSP-A.I-07 Supplying & Laying 101.6 mm SWG channels with cement mortar joints with
suitable brick masonry for fixing the channels in position
8 TBSP-A.I-08 Supplying & Laying 152.4 mm SWG channels with cement mortar joints with
suitable brick masonry for fixing the channels in position
9 TBSP-A.I-09 Supplying & fixing 150 mm x 100 mm SWG gully traps conforming to ISI
651 & 4127 with C.I Grating & Cost. Brick masonry in CM 1:6 prop. Intermediate
chamber and fitted with 304.8 mm x 288.6mm (12"x9") C.I Frame and hinged
cover
II SUB-SECTION S.W.G. PIPES&FITTINGS
10 TBSP-A.II-01 Supply of SWG SP-1 pipe conforming to ISI 651 - 4" dia (101.6mm)
11 TBSP-A.II-02 Supply of SWG SP-1 pipe conforming to ISI 651 - 6" dia (152.4mm)
12 TBSP-A.II-03 Supply of SWG SP-1 pipe conforming to ISI 651 - 8" dia (203.2mm)
13 TBSP-A.II-04 Supply of SWG SP-1 pipe conforming to ISI 651 - 10" dia (254 mm)
14 TBSP-A.II-05 Supply of SWG SP-1 pipe conforming to ISI 651 - 12" dia (300 mm)
15 TBSP-A.II-06 Supply of SWG SP-1 pipe conforming to ISI 651 - 14" dia (350 mm)
16 TBSP-A.II-07 Supply of SWG SP-2 pipe conforming to ISI 651 - 4" dia (101.6mm)
17 TBSP-A.II-08 Supply of SWG SP-2 pipe conforming to ISI 651 - 6" dia (152.4mm)
18 TBSP-A.II-09 Supply of SWG SP-2 pipe conforming to ISI 651 - 8" dia (203.2mm)
19 TBSP-A.II-10 Supply of SWG SP-2 pipe conforming to ISI 651 - 10" dia (254 mm)
20 TBSP-A.II-11 Supply of SWG SP-2 pipe conforming to ISI 651 - 12" dia (300 mm)
21 TBSP-A.II-12 Supply of SWG SP-2 pipe conforming to ISI 651 - 14" dia (350 mm)
22 TBSP-A.II-13 Supply of SWG SP-2 pipe conforming to ISI 651 - 16" dia (400 mm)
23 TBSP-A.II-14 Supply of SWG SP-2 pipe conforming to ISI 651 - 18" dia (450 mm)
24 TBSP-A.II-15 Supply of SWG SP-3 pipe conforming to ISI 651 - 4" dia (101.6mm)
25 TBSP-A.II-16 Supply of SWG SP-3 pipe conforming to ISI 651 - 6" dia (152.4mm)
26 TBSP-A.II-17 Supply of SWG SP-3 pipe conforming to ISI 651 - 8" dia (203.2mm)
27 TBSP-A.II-18 Supply of SWG SP-3 pipe conforming to ISI 651 - 10" dia (254 mm)
28 TBSP-A.II-19 Supply of SWG SP-3 pipe conforming to ISI 651 - 12" dia (300 mm)
29 TBSP-A.II-20 Supply of SWG SP-3 pipe conforming to ISI 651 - 14" dia (350 mm)
30 TBSP-A.II-21 Supply of SWG SP-2 pipe conforming to ISI 651 - 16" dia (400 mm)
31 TBSP-A.II-22 Supply of SWG SP-3 pipe conforming to ISI 651 - 18" dia (450 mm)
32 TBSP-A.II-23 Supply of SWG Bends conforming to IS standards -100 mm dia
33 TBSP-A.II-24 Supply of SWG Bends conforming to IS standards -150 mm dia
34 TBSP-A.II-25 Supply of SWG Bends conforming to IS standards -200 mm dia
35 TBSP-A.II-26 Supply of SWG Bends conforming to IS standards -250 mm dia
36 TBSP-A.II-27 Supply of SWG Bends conforming to IS standards -300 mm dia
37 TBSP-A.II-28 Supply of SWG Bends conforming to IS standards -350 mm dia
38 TBSP-A.II-29 Supply of SWG Junctions (T's & Y's) conforming to IS standards with length
of barrel 60 cm for - 100 x 100
39 TBSP-A.II-30 Supply of SWG Junctions (T's & Y's) conforming to IS standards with length of
barrel 60 cm for - 150 x 100
40 TBSP-A.II-31 Supply of SWG Junctions (T's & Y's) conforming to IS standards with length of
barrel 60 cm for - 150 x 150
41 TBSP-A.II-32 Supply of SWG Junctions (T's & Y's) conforming to IS standards with
length of barrel 60 cm for - 200 x 100
42 TBSP-A.II-33 Supply of SWG Junctions (T's & Y's) conforming to IS standards with
length of barrel 60 cm for - 200 x 150
43 TBSP-A.II-34 Supply of SWG Junctions (T's & Y's) conforming to IS standards with
length of barrel 60 cm for - 200 x 200
44 TBSP-A.II-35 Supply of SWG Junctions (T's & Y's) conforming to IS standards with
length of barrel 60 cm for - 250 x 100
45 TBSP-A.II-36 Supply of SWG Junctions (T's & Y's) conforming to IS standards with
length of barrel 60 cm for - 250 x 150
46 TBSP-A.II-37 Supply of SWG Junctions (T's & Y's) conforming to IS standards with
length of barrel 60 cm for - 250 x 200
47 TBSP-A.II-38 Supply of SWG Junctions (T's & Y's) conforming to IS standards with
length of barrel 60 cm for - 250 x 250
48 TBSP-A.II-39 Supply of SWG Junctions (T's & Y's) conforming to IS standards with
length of barrel 60 cm for - 300 x 100
49 TBSP-A.II-40 Supply of SWG Junctions (T's & Y's) conforming to IS standards with
length of barrel 60 cm for - 300 x 150
50 TBSP-A.II-41 Supply of SWG Junctions (T's & Y's) conforming to IS standards with
length of barrel 60 cm for - 300 x 200
51 TBSP-A.II-42 Supply of SWG Junctions (T's & Y's) conforming to IS standards with
length of barrel 60 cm for - 300 x 250
52 TBSP-A.II-43 Supply of SWG Junctions (T's & Y's) conforming to IS standards with
length of barrel 60 cm for - 300 x 300
53 TBSP-A.II-44 Supply of SWG Junctions (T's & Y's) conforming to IS standards with
length of barrel 60 cm for - 350 x 100
54 TBSP-A.II-45 Supply of SWG Junctions (T's & Y's) conforming to IS standards with
length of barrel 60 cm for - 350 x 150
55 TBSP-A.II-46 Supply of SWG Junctions (T's & Y's) conforming to IS standards with
length of barrel 60 cm for - 350 x 200
56 TBSP-A.II-47 Supply of SWG Junctions (T's & Y's) conforming to IS standards with
length of barrel 60 cm for - 350 x 250
57 TBSP-A.II-48 Supply of SWG Junctions (T's & Y's) conforming to IS standards with
length of barrel 60 cm for - 350 x 300
58 TBSP-A.II-49 Supply of SWG Junctions (T's & Y's) conforming to IS standards with
length of barrel 60 cm for - 350 x 350
59 TBSP-A.II-50 Supply of SWG Plugs conforming to IS standards for 100 mm dia
60 TBSP-A.II-51 Supply of SWG Plugs conforming to IS standards for 150 mm dia
61 TBSP-A.II-52 Supply of SWG Plugs conforming to IS standards for 200 mm dia
62 TBSP-A.II-53 Supply of SWG Plugs conforming to IS standards for 250 mm dia
63 TBSP-A.II-54 Supply of SWG Plugs conforming to IS standards for 300 mm dia
64 TBSP-A.II-55 Supply of SWG Plugs conforming to IS standards for 350 mm dia
65 TBSP-A.II-56 Supply of SWG Gully Traps (Round & Square) conforming to IS standards 150 x 100
mm
66 TBSP-A.II-57 Supply of SWG Saddles conforming to IS standards 150 x 100 mm
67 TBSP-A.II-58 Supply of SWG Saddles conforming to IS standards 200 x 100 mm
68 TBSP-A.II-59 Supply of SWG Saddles conforming to IS standards 250 x 100 mm
TBSP-A.II-60 Supply of SWG Rubber Rings, glue & Fixing Charges confirming to IS standards
150mm
TBSP-A.II-61 Supply of SWG Rubber Rings, glue & Fixing Charges confirming to IS standards
200mm
TBSP-A.II-62 Supply of SWG Rubber Rings, glue & Fixing Charges confirming to IS standards
250mm
TBSP-A.II-63 Supply of SWG Rubber Rings, glue & Fixing Charges confirming to IS standards
300mm
III SUB-SECTION LABOUR CHARGES FOR SWG WORKS
69 TBSP-A.III-01 Labour charges only for laying, jointing and testing SWG pipes of any dia
with airtight cement joints including excavation of trenches and socket pits in
any soil up to 914.4 mm (3'0") depth (except rock requiring blasting) and
refilling with watering and tamping.
70 TBSP-A.III-02 Labour charges only for laying, jointing and testing SWG pipes of any dia with
airtight cement joints including excavation of trenches and socket pits in any
soil up to 1524 mm (5'-0") depth (except rock requiring blasting)
and refilling with watering and tamping.
71 TBSP-A.III-03 Labour charges only for laying 101.6 mm SWG channels with cement mortar
joints with suitable brick masonry for fixing the channels in position
72 TBSP-A.III-04 Labour charges only for laying 152.4 mm SWG channels with cement mortar
joints with suitable brick masonry for fixing the channels in position
73 TBSP-A.III-05 Labour charges only for fixing and laying the SWG Junctions/ Plugs / Bends of
any dia with airtight cement joints as per standard practice
B SECTION MANHOLES & INSPECTION CHAMBERS - AS PER - IS 4111 : Part 1 : 1986
I SUB-SECTION MANHOLES
74 TBSP-B.I-01 Constructing 904.0mm (3’0”) dia solid block masonry inspection chamber as
per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using fly-ash blocks
of 225 mm thick from approved source having a minimum crushing strength
of 10 N/sq.mm including plastering with cement mortar 1:3 prop; ½” thick both
inside and outside fitted with 20” dia RCC manhole covers and frames
including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils
(excluding rock) and laying cement concrete (1:4:8) 150 mm thick using
40 mm HBG Metal and P.C.C.1:2:4 benching and channel 100 mm thick as per
Standard specification and including cost and conveyance of all materials like
cement, sand, bricks, water etc., to site, cost of seigniorage charges on all
materials and all incidental and operational, labour charges like mixing
cement mortar, constructing masonry, lift charges, curing etc., complete for
finished item of work as per Standard specification.
75 TBSP-B.I-02 Constructing 904.0 mm (3’0”) dia solid block masonry inspection chamber as
per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using fly-ash blocks
of 225 mm thick from approved source having a minimum crushing strength of
10 N/sq.mm including plastering with cement mortar 1:3 prop; ½” thick both
inside and outside fitted with 20” dia RCC manhole covers and frames
including excavating pits up to a depth of 1524 mm (5'-0") in all sorts of
soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using
40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per
Standard specification and including cost and conveyance of all materials like
cement, sand, bricks, water etc., to site, cost of seigniorage charges on all
materials and all incidental and operational, labour charges like mixing
cement mortar, constructing masonry, lift charges, curing etc., complete for
finished item of work as per Standard
specification.
76 TBSP-B.I-03 Constructing 904.0mm (3’0”) dia brick masonry inspection chamber as per IS -
4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks
of 225 mm thick from approved source having a minimum crushing strength of
5 N/sq.mm including plastering with cement mortar 1:3 prop; ½” thick both inside
and outside fitted with 20” dia RCC manhole covers and frames including
excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding
rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG
Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard
specification and including cost and conveyance of all materials like cement,
sand, bricks, water etc., to site, cost of seigniorage charges on all materials
and all incidental and operational, labour charges like mixing cement mortar,
constructing masonry, lift charges, curing etc., complete for finished item of
work as per Standard specification.
77 TBSP-B.I-04 Constructing 904.0mm (3’0”) dia brick masonry inspection chamber as per IS -
4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks
of 225 mm thick from approved source having a minimum crushing strength of
5 N/sq.mm including plastering with cement mortar 1:3 prop; ½” thick both inside
and outside fitted with 20” dia RCC manhole covers and frames including
excavating pits up to a depth of 1524 mm (5'-0") in all sorts of soils (excluding
rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG
Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard
specification and including cost and conveyance of all materials like cement,
sand, bricks, water etc., to site, cost of seigniorage charges on all materials
and all incidental and operational, labour charges like mixing cement mortar,
constructing masonry, lift charges, curing etc., complete for finished item of work
as per Standard specification.
93 TBSP-C.I-02 Supplying and fixing of C.I. soil pipes ISI marked conforming to IS:1729-1979 of
approved make with cement caulked joints and fixing as per site requirements
including painting black with Japan paint and fixing with necessary wooden
blocks fixed in the masonry walls in cement mortar (1½:1) including fixing of
M.S. clamps if necessary with required no. of Bombay nails etc., complete
for 4" dia (101.6mm) Single Socket
94 TBSP-C.I-03 Supplying and fixing of C.I. soil pipes ISI marked conforming to IS:1729-
1979 of approved make with cement caulked joints and fixing as per site
requirements including painting black with Japan paint and fixing with
necessary wooden blocks fixed in the masonry walls in cement mortar (1½:1)
including fixing of M.S. clamps if necessary with required no. of Bombay nails
etc., complete for 6" dia (152.4mm) Single Socket
95 TBSP-C.I-04 Supplying and fixing of C.I. soil pipes ISI marked conforming to IS:1729-1979 of
approved make with cement caulked joints and fixing as per site requirements
including painting black with Japan paint and fixing with necessary wooden
blocks fixed in the masonry walls in cement mortar (1½:1) including fixing of
M.S. clamps if necessary with required no. of Bombay nails etc., complete
for 3" dia (75 mm nominal size) Double Socket
96 TBSP-C.I-05 Supplying and fixing of C.I. soil pipes ISI marked conforming to IS:1729-1979 of
approved make with cement caulked joints and fixing as per site requirements
including painting black with Japan paint and fixing with necessary wooden
blocks fixed in the masonry walls in cement mortar (1½:1) including fixing of
M.S. clamps if necessary with required no. of Bombay nails etc., complete
for 4" dia (101.6mm) Double Socket
97 TBSP-C.I-06 Supplying and fixing of C.I. soil pipes ISI marked conforming to IS:1729-1979
of approved make with cement caulked joints and fixing as per site requirements
including painting black with Japan paint and fixing with necessary wooden
blocks fixed in the masonry walls in cement mortar (1½:1) including fixing of
M.S. clamps if necessary with required no. of Bombay nails etc., complete
for 6" dia (152.4mm) Double Socket
106 TBSP-C.II-09 Supplying and fixing of 152.4 mm (6") CI soil single junction with plug
: conforming to IS:1729-1979 with cement caulked joints and fixing
107 TBSP-C.II-10 Supplying and fixing of 75 mm nominal size (3") CI soil plain single junction
: conforming to IS:1729-1979 with cement caulked joints and fixing
108 TBSP-C.II-11 Supplying and fixing of 101.6 mm (4") CI soil plain single junction conforming
to IS:1729-1979 with cementcaulked joints and fixing.
109 TBSP-C.II-12 Supplying and fixing of 152.4 mm (6") CI soil plain single junction conforming
to IS:1729-1979 with cement caulked joints and fixing.
110 TBSP-C.II-13 Supplying and Fixing of 75 mm nominal size (3") CI soil Double junction with
plug : conforming to IS:1729-1979 with cement caulked joints and fixing
111 TBSP-C.II-14 Supplying and Fixing of 101.6 mm (4") CI soil Double junction with plug :
conforming to IS:1729-1979 with cement caulked joints and fixing
112 TBSP-C.II-15 Supplying and Fixing of 152.4 mm (6") CI soil Double junction with plug :
conforming to IS:1729-1979 with cement caulked joints and fixing
113 TBSP-C.II-16 Supplying and Fixing of 75 mm nominal size (3") CI soil plain Double junction :
conforming to IS:1729-1979 with cement caulked joints and fixing
114 TBSP-C.II-17 Supplying and Fixing of 101.6 mm (4") CI soil plain Double junction conforming to
IS:1729-1979 with cement caulked joints and fixing
115 TBSP-C.II-18 Supplying and Fixing of 152.4 mm (6") CI soil plain Double junction conforming to
IS:1729-1979 with cement caulked joints and fixing.
116 TBSP-C.II-19 Supplying and Fixing of 75mm C.I. Offsets Ist quality conforming to IS:1729-
1979 with cement caulked joints and fixing -for 76.20 mm (3") C.I. Pipe
117 TBSP-C.II-20 Supplying and Fixing of 75mm C.I. Offsets Ist quality conforming to IS:1729-
1979 with cement caulked joints and fixing -for 101.6 mm (4") C.I. Pipe
118 TBSP-C.II-21 Supplying and Fixing of 75mm C.I. Offsets Ist quality
conforming to IS:1729-1979 with cement caulked joints
and fixing -for 152.4 mm (6") C.I. Pipe
119 TBSP-C.II-22 Supplying and Fixing of 115 mm C.I. Offsets Ist quality
conforming to IS:1729-1979 with cement caulked joints
and fixing - for 76.20 mm (3") C.I. Pipe
120 TBSP-C.II-23 Supplying and Fixing of 115 mm C.I. Offsets Ist quality
conforming to IS:1729-1979 with cement caulked joints
and fixing - for 101.6 mm (4") C.I. Pipe
121 TBSP-C.II-24 Supplying and Fixing of 115mm C.I. Off sets Ist quality conforming to IS:1729-
1979 with cement caulked joints and fixing - for 152.4 mm (6") C.I. Pipe
122 TBSP-C.II-25 Supplying and Fixing of 150 mm C.I. Offsets Ist quality conforming to
IS:1729-1979 with cement caulked joints and fixing for 76.20 mm (3") C.I. Pipe
123 TBSP-C.II-26 Supplying and Fixing of 150 mm C.I. Offsets Ist quality conforming to
IS:1729-1979 with cement caulked joints and fixing for 101.6 mm (4") C.I. Pipe
124 TBSP-C.II-27 Supplying and Fixing of 150 mm C.I. Offsets Ist quality conforming to
IS:1729-1979 with cement caulked joints and fixing for 152.4 mm (6") C.I. Pipe
125 TBSP-C.II-28 Supplying & fixing CI floor traps 1st quality ISI marked conforming to
IS:1729-1979 with C.P. Grating fixing with white cement as per site
requirements with standard practice for nominal dia 75 mm (3") and grating size
165 mm dia of weight not less than 5.5 Kgs
126 TBSP-C.II-29 Supplying & fixing CI floor traps 1st quality ISI marked with C.P.Grating fixing
with white cement as per site requirements with standard practice for nominal dia
100 mm (4") and grating size 100 mm dia of weight not less than 6 Kgs
127 TBSP-C.II-30 Supplying & fixing CI floor traps 1st quality ISI marked conforming to
IS:1729-1979 with C.P. Grating fixing with white cement as per site
requirements with standard practice for nominal dia 75 mm (3") and grating
size 100 mm dia of weight not less than 4.0 Kgs
128 TBSP-C.II-31 Supplying & fixing CI Collars (double socket) Ist quality ISI marked conforming to
IS:1729-1979 with cement caulked joints and fixing as per site requirements
with standard practice for 76.20 mm (3") C.I. Pipe
129 TBSP-C.II-32 Supplying & fixing CI Collars (double socket) Ist quality ISI marked conforming to
IS:1729-1979 with cement caulked joints and fixing as per site requirements with
standard practice for 101.6 mm (4") C.I. Pipe
130 TBSP-C.II-33 Supplying & fixing CI Collars (double socket) Ist quality ISI marked conforming to
IS:1729-1979 with cement caulked joints and fixing as per site requirements with
standard practice for 152.4 mm (6") C.I. Pipe
134 TBSP-C.III-04 Labour charges only fixing CI soil Double junctions with cement caulked joints
and fixing as per site requirements with standard practice
135 TBSP-C.III-05 Labour charges only fixing CI soil Collars, Bends, Offsets etc. with cement
caulked joints and fixing as per site requirements with standard practice
136 TBSP-C.III-06 Labour charges only for fixing CI Nahany/ Floor traps with C.P. Grating fixing
with white cement as per site requirements with standard practice
137 TBSP-C.III-07 Boxing of Nahany traps in RCC floors
138 TBSP-C.III-08 Boxing of W.C Traps in R.C.C floors
D SECTION CENTRIFUGAL CAST IRON PIPES&FITTNGS AS PER IS: 3989 - 1984
I SUB-SECTION SUPPLY OF CENTRIFUGAL CI PIPES
139 TBSP-D.I-01 75 mm dia CI (spun) soils Waste & Ventilating pipe (3 M)
140 TBSP-D.I-02 100 mm dia CI (spun) soils Waste & Ventilating pipe (3 M)
141 TBSP-D.I-03 150 mm dia CI (spun) soils Waste & Ventilating pipe (3 M)
142 TBSP-D.I-04 75 mm dia CI (spun) soils Waste & Ventilating pipe (3 M) Double socket
143 TBSP-D.I-05 100 mm dia CI (spun) soils Waste & Ventilating pipe (3 M) Double socket
144 TBSP-D.I-06 75 mm dia 9'-0" (2743.2 mm) CI (Spun) pipes
145 TBSP-D.I-07 100 mm dia 9'-0" (2743.2 mm) CI (Spun) pipes
146 TBSP-D.I-08 75 mm dia 8'-0" (2438.4 mm) CI (Spun) pipes
147 TBSP-D.I-09 100 mm dia 8'-0" (2438.4 mm) CI (Spun) pipes
148 TBSP-D.I-10 75 mm dia 6'-0" (1828.8 mm) CI (Spun) pipes
149 TBSP-D.I-11 100 mm dia 6'-0" (1828.8 mm) CI (Spun) pipes
150 TBSP-D.I-12 75 mm dia 6'-0" (1828.8 mm) Double Socket CI (Spun) pipes
151 TBSP-D.I-13 100 mm dia 6'-0" (1828.8 mm) Double Socket CI (Spun) pipes
II SUB-SECTION SUPPLY OF C.I. SPUN FITTINGS
152 TBSP-D.II-01 75 mm dia Cut pipes (pieces) 1 foot (304.8 mm) CI (Spun) fittings
153 TBSP-D.II-02 100 mm dia Cut pipes (pieces) 1 foot (304.8 mm) CI (Spun) fittings
154 TBSP-D.II-03 75 mm dia Cut pipes (pieces) 1'.6" (457.2 mm) CI (Spun) fittings
155 TBSP-D.II-04 100 mm dia Cut pipes (pieces) 1'.6" (457.2 mm) CI (Spun) fittings
156 TBSP-D.II-05 150 mm dia Cut pipes (pieces) 1'.6" (457.2 mm) CI (Spun) fittings
157 TBSP-D.II-06 75 mm dia Cut pipes (pieces ) 2 feet (609.6 mm) CI (Spun) fittings
158 TBSP-D.II-07 100 mm dia Cut pipes (pieces ) 2 feet (609.6 mm) CI (Spun) fittings
159 TBSP-D.II-08 150 mm dia Cut pipes (pieces ) 2 feet (609.6 mm) CI (Spun) fittings
160 TBSP-D.II-09 75 mm dia Cut pipes (pieces ) 3 feet (914.4 mm) CI (Spun) fittings
161 TBSP-D.II-10 100 mm dia Cut pipes (pieces ) 3 feet (914.4 mm) CI (Spun) fittings
162 TBSP-D.II-11 75 mm dia Cut pipes (pieces ) 4 feet (1219.2 mm) CI (Spun) fittings
163 TBSP-D.II-12 100 mm dia Cut pipes (pieces ) 4 feet (1219.2 mm) CI (Spun) fittings
164 TBSP-D.II-13 75 mm dia Plain Bend - CI (Spun) fittings
165 TBSP-D.II-14 100 mm dia Plain Bend - CI (Spun) fittings
166 TBSP-D.II-15 150 mm dia Plain Bend - CI (Spun) fittings
167 TBSP-D.II-16 75 mm dia Door Bend - CI (Spun) fittings
168 TBSP-D.II-17 100 mm dia Door Bend - CI (Spun) fittings
169 TBSP-D.II-18 150 mm dia Door Bend - CI (Spun) fittings
170 TBSP-D.II-19 75 mm dia Plain Bend 45 Degrees - CI (Spun) fittings
171 TBSP-D.II-20 100 mm dia Plain Bend 45 Degrees - CI (Spun) fittings
172 TBSP-D.II-21 150 mm dia Plain Bend 45 Degrees - CI (Spun) fittings
173 TBSP-D.II-22 75 mm dia Door Bend 45 Degrees - CI (Spun) fittings
263 TBSP-E.IV-01 Supplying & Fixing low down porcelain flushing tank with lid 10 Lit Capacity with
internal components
264 TBSP-E.IV-02 Supplying & Fixing internal cistern fittings for dual flush cisterns
265 TBSP-E.IV-03 Supplying & Fixing ultra slim concealed flushing cistern of HDPE body and of
size 460 x 450 x 80 mm with internal component for wall mounted Wash down
WC
V SUB-SECTION PLASTIC SEATS FOR WATER CLOSETS
266 TBSP-E.V-01 Supplying and Fixing best Indian make plastic seat and lid for European water
closets with rubber or plastic Buffers as per IS 2548-1996
267 TBSP-E.V-02 Supplying and Fixing best Indian make plastic soft closing seat and lid for
European water closets with rubber or plastic Buffers as per IS 2548-1996
SUB-
VI SECTION WASH HAND BASINS
268 TBSP-E.VI-01 Supplying & Fixing Indian make Flat Back Wash Hand
Basin 1st quality conforming to IS:2556-Part-4:1972 with
waste fittings like rubber plug, chain, 32 mm nominal size
C.P. Fitting with parallel pipe thread conforming to
IS:2963-1979 and fitted with 15 mm nominal bore
Chromium Plated Pillar Tap of 1st quality Indian make
400 grams complete with standard CI brackets including
wooden block: 660 x 460 mm - Single C.P. Pillar cock
269 TBSP-E.VI-02 Supplying & Fixing Indian make Flat Back Wash Hand
Basin 1st quality conforming to IS:2556-Part-4:1972 with
waste fittings like rubber plug, chain, 32 mm nominal size
C.P. Fitting with parallel pipe thread conforming to
IS:2963-1979 and fitted with 15 mm nominal bore
Chromium Plated Pillar Tap of 1st quality Indian make
400 grams complete with standard CI brackets including
wooden block: 630 x 450 mm - Single C.P. Pillar cock
270 TBSP-E.VI-03 Supplying & Fixing Indian make Flat Back Wash Hand
Basin 1st quality conforming to IS:2556-Part-4:1972 with
waste fittings like rubber plug, chain, 32 mm nominal size
C.P. Fitting with parallel pipe thread conforming to
IS:2963-1979 and fitted with 15 mm nominal bore
Chromium Plated Pillar Tap of 1st quality Indian make
400 grams complete with standard CI brackets including
wooden block: 630 x 450 mm - Double C.P. Pillar cock
271 TBSP-E.VI-04 Supplying & Fixing Indian make Flat Back Wash Hand
Basin 1st quality conforming to IS:2556-Part-4:1972 with
waste fittings like rubber plug, chain, 32 mm nominal size
C.P. Fitting with parallel pipe thread conforming to
IS:2963-1979 and fitted with 15 mm nominal bore
Chromium Plated Pillar Tap of 1st quality Indian make
400 grams complete with standard CI brackets including
wooden block: 550 x 400 mm - Single C.P. Pillar cock
272 TBSP-E.VI-05 Supplying & Fixing Indian make Flat Back Wash Hand
Basin 1st quality conforming to IS:2556-Part-4:1972 with
waste fittings like rubber plug, chain, 32 mm nominal size
C.P. Fitting with parallel pipe thread conforming to
IS:2963-1979 and fitted with 15 mm nominal bore
Chromium Plated Pillar Tap of 1st quality Indian make
400 grams complete with standard CI brackets including
wooden block: 550 x 400 mm - Double C.P. Pillar cock
273 TBSP-E.VI-06 Supplying & Fixing Indian make Flat Back Wash Hand
Basin 1st quality conforming to IS:2556-Part-4:1972 with
waste fittings like rubber plug, chain, 32 mm nominal size
C.P. Fitting with parallel pipe thread conforming to
IS:2963-1979 and fitted with 15 mm nominal bore
Chromium Plated Pillar Tap of 1st quality Indian make
400 grams complete with standard CI brackets including
wooden block: 450 x 300 mm - Single C.P. Pillar cock
274 TBSP-E.VI-07 Supplying & Fixing Indian make Flat Back Wash Hand
Basin 1st quality conforming to IS:2556-Part-4:1972 with
waste fittings like rubber plug, chain, 32 mm nominal size
C.P. Fitting with parallel pipe thread conforming to
IS:2963-1979 and fitted with 15 mm nominal bore
Chromium Plated Pillar Tap of 1st quality Indian make
400 grams complete with standard CI brackets including
wooden block: 450 x 300 mm - Double C.P. Pillar cock
275 TBSP-E.VI-08 Supplying & Fixing Indian make below counter Wash
Hand Basin 1st quality with waste fittings like rubber
plug, chain, 32 mm nominal size C.P. Fitting with parallel
pipe thread conforming to IS:2963-1979 and fitted with
15 mm nominal bore Chromium Plated Pillar Tap of 1st
quality Indian make 400 grams complete with standard CI
brackets including wooden block with single CP pillar cock
276 TBSP-E.VI-09 Supplying & Fixing Indian make white glazed vitreous
china porcelain sink conforming to IS:2556-Part-5-1994
on cantilever brackets with waste fittings like rubber plug,
chain, 32 mm nominal size C.P. Fitting with parallel pipe
thread conforming to IS:2963-1979 : 600 x 400 x 250
277 TBSP-E.VI-10 Supplying & Fixing Indian make white glazed vitreous
china porcelain sink conforming to IS:2556-Part-5-1994
on cantilever brackets with waste fittings like rubber plug,
chain, 32 mm nominal size C.P. Fitting with parallel pipe
thread conforming to IS:2963-1979 : 750 x 450 x 250
278 TBSP-E.VI-11 Supplying & fixing oval shape basin white 520x410mm/ 540 x 450 mm
279 TBSP-E.VI-12 Supplying and Fixing Pedestal for Wash Hand Basin
280 TBSP-E.VI-13 Supplying & fixing stainless steel sink size 36" x 18" (914.4x457.2mm)
1 mm thick with accessories
281 TBSP-E.VI-14 Supplying & fixing SINGLE BOWL stainless steel sink size
24"x18"x8 " (609.6 x 457.2 x 203.2mm) 1 mm thick with
accessories
282 TBSP-E.VI-15 Supplying & fixing stainless steel sink size 20" x18" x 8 "
(508x457.2x203.2mm) 1 mm thick with accessories
283 TBSP-E.VI-16 S&F 609.6 x 457.2 x 254 mm RCC terrazzo finished sink
(or constructed at site with 50.8mm thick) brass plug and
chain including CI cantilever brackets
VII SUB-SECTION URINALS
284 TBSP-E.VII-01 Supplying & Fixing white glazed flat back Bowl urinals of
size 440 mm x 265 mm x 315 mm with internal flushing
rim fixed with screws complete Indian make conforming
to IS:2556-1995
285 TBSP-E.VII-02 Supplying & Fixing white glazed flat back half stall urinals
1st quality conforming to IS:2556-1995 with standard C.P.
Spreader fixed with screws complete Indian make : 410 x
265 x 305 mm
286 TBSP-E.VII-03 Supplying & Fixing white glazed flat back half stall urinals
1st quality conforming to IS:2556-1995 with standard C.P.
Spreader fixed with screws complete Indian make : 590 x
375 x 390 mm
287 TBSP-E.VII-04 Supplying & fixing 4 " x 24 " (101.6x609.6mm) white
glazed porcelain channel fixed in brick masonry white
cement pointing.
VIII SUB-SECTION LABOUR CHARGES FOR SANITARY WARE
288 TBSP-E.VIII-01 Labour charges only for fixing Indian pattern W.C with "P" or "S" trap
289 TBSP-E.VIII-02 Labour charges only Fixing Orissa pan W.C with "P" or "S" trap
290 TBSP-E.VIII-03 Labour charges only for fixing porcelain foot rest for squatting I.W.C.
(Rectangular pair)
291 TBSP-E.VIII-04 Labour charges only for fixing low down porcelain flushing tank with
internal components
292 TBSP-E.VIII-05 Labour charges only for fixing internal cistern fittings of any flushing tank
293 TBSP-E.VIII-06 Labour charges only for fixing European Water Closet with 'P' or 'S' trap as per
standard practice
294 TBSP-E.VIII-07 Labour charges only for fixing plastic seat and lid for European water
closet
295 TBSP-E.VIII-08 Labour charges only for fixing Indian make Flat Back Wash Hand Basin
with waste fittings like rubber plug, chain, 32 mm nominal size C.P.
Fitting Pillar Taps complete with standard CI brackets including wooden
block
296 TBSP-E.VIII-09 Labour charges only for fixing pedestal for wash hand basin
297 TBSP-E.VIII-10 Labour charges only for fixing bottle trap to the wash hand basin
298 TBSP-E.VIII-11 Labour charges only Fixing flat back Bowl/ Half stall urinals with fixing
C.P. Spreader and screws complete
299 TBSP-E.VIII-12 Labour charges only for fixing Vitreous china porcelain sinks with waste
fittings, rubber plug, chain, cantilever brackets etc.
F SECTION CP FITTINGS (Materials shall be procured from the list of approved Brands/
Manufacturers/ Suppliers)
I SUB-SECTION TAPS&FAUCETS - BIB TAPS
300 TBSP-F.I-01 S&F of 15 mm brass body CP finish bib tap of not less than
300 grams weight screw type (full turn) with internal /
external threaded connection conforming to IS 8931
301 TBSP-F.I-02 S&F of 15 mm brass body CP finish bib tap of not less than
300 grams weight with quarter turn spindle with either
internal or external threaded connection conforming to IS
8931
302 TBSP-F.I-03 S&F of 15 mm brass body premium variety Chromium
Plated finish bib tap with wall flange of not less than 500
grams weight with quarter turn spindle with either
internal or external threaded connection conforming to IS
8931 and with 7 - 10 years warranty
303 TBSP-F.I-04 S&F of 15 mm brass body premium variety Chromium Plated finish bib tap
angular shape with wall flange of not less than 500 grams weight with quarter turn
spindle with either internal or external threaded connection
conforming to IS 8931 and with 7 - 10 years warranty
304 TBSP-F.I-05 S&F of 15 mm brass body CP finish two way bib tap of not less than 400 grams
weight with quarter turn spindle internal/ external threaded connection
conforming to IS 8931
305 TBSP-F.I-06 S&F of 15 mm brass body premium variety Chromium
Plated finish two way bib tap with flange of not less than
500 grams weight with quarter turn spindle internal/
external threaded connection conforming to IS 8931 and
with 7 - 10 years warranty
306 TBSP-F.I-07 S&F of Chromium plated finish brass body quarter turn Bibcock cum Health
Faucet with 1m long tube and wall hook with 7 - 10 years warranty
307 TBSP-F.I-08 S&F of 15 mm brass body CP finish long body bib tap of not less than 400
grams weight with quarter turn spindle internal / external threaded connection
conforming to IS 8931
II SUB-SECTION TAPS&FAUCETS - PILLAR TAPS
308 TBSP-F.II-01 S&F of 15 mm brass body CP finish pillar tap of not less than 300 grams
weight screw type (full turn) conforming to IS 8931
309 TBSP-F.II-02 S&F of 15 mm brass body CP finish pillar tap of not less than 500 grams
weight quarter turn spindle conforming to
IS 8931
310 TBSP-F.II-03 S&F of 15 mm brass body Premium variety Chromium plated finish pillar
cock with aerator of not less than 500 grams weight quarter turn spindle
conforming to IS 8931 and with a warranty of 7-10 years
311 TBSP-F.II-04 S&F of 15 mm brass body Premium variety Chromium plated finish long
neck pillar cock with aerator of not less than 500 grams weight quarter turn
spindle conforming to IS 8931 and with a warranty of 7-10 years
312 TBSP-F.II-05 S&F of 15 mm brass body Premium variety Chromium
plated finish single lever pillar cock with aerator of not
less than 500 grams weight quarter turn spindle
conforming to IS 8931 and with a warranty of 7-10 years
313 TBSP-F.II-06 S&F premium make Sensotronic sensor faucet for wash basin, and with 7 -
10 years warranty
314 TBSP-F.II-07 S&F premium make Sensotronic concealed type flushing valve for urinal
complete set with installation box with control cock, and with 7 - 10 years
warranty
315 TBSP-F.II-08 S&F premium make Auto closing system pillar cock for wash basin, and with
7 - 10 years warranty
316 TBSP-F.II-09 S&F premium make Auto Closing system Bibcock, and with 7 - 10 years
warranty
III SUB-SECTION TAPS&FAUCETS - OTHER TAPS & SPOUTS
317 TBSP-F.III-01 S&F of 15 mm brass body CP finish self closing tap push
type conforming to IS 1711
318 TBSP-F.III-02 S&F of 15 mm brass body CP finish self closing tap lift
type conforming to IS 1711
319 TBSP-F.III-03 S&F of 15 mm brass body Premium variety Chromium
plated finish Swan neck tap with right/left hand operating
knob with aerator of not less than 500 grams weight
quarter turn spindle conforming to IS 8931 and with a
warranty of 10 years
320 TBSP-F.III-04 S&F of 15 mm brass body CP finish wall mounted sink
spout with connecting legs & wall flanges swinging nozzle
conforming to IS 8931 and with a warranty of 10 years
321 TBSP-F.III-05 S&F of 15 mm brass body CP finish wall mounted sink
spout with connecting legs & wall flanges fixed nozzle
conforming to IS 8931 and with a warranty of 10 years
322 TBSP-F.III-06 S&F of 15 mm bath tub spout minimum 180 mm
projection with diverter system
323 TBSP-F.III-07 S&F of 15 mm bath tub spout with tip ton minimum 180 mm projection with diverter
system
IV SUB-SECTION STOP & ANGLE VALVES
324 TBSP-F.IV-01 S&F 15 mm nominal size CP finish brass stop valve screw type with internal
/external threaded conforming to IS 8931
325 TBSP-F.IV-02 S&F 15 mm nominal size brass concealed stop valve screw type with internal
/external threaded conforming to IS 8931
326 TBSP-F.IV-03 S&F 15 mm nominal size CP finish brass angled stop valve screw type with
internal /external threaded conforming to IS 8931
327 TBSP-F.IV-04 S&F of 15 mm CP finish brass stop valve of not less than 400 grams weight quarter
turn spindle with internal threaded conforming to IS 8931
328 TBSP-F.IV-05 S&F of 15 mm CP finish brass concealed stop valve of not less than 400 grams
weight quarter turn spindle conforming to IS 8931
329 TBSP-F.IV-06 S&F of 15 mm CP finish brass concealed stop valve of not less than 400 grams
weight with adjustable wall flange and quarter turn spindle conforming to IS 8931
and with 7 - 10 years warranty
330 TBSP-F.IV-07 S&F of 15 mm brass angle stop valve of quarter turn spindle type of not less than
400 grams weight with internal threaded conforming to IS 8931
V SUB-SECTION COMBINATION FAUCETS
330 TBSP-F.V-01 S&F of 15 mm CP finish brass body wall mixer with hand shower with center
distance 150 mm conforming to IS 8931
331 TBSP-F.V-02 S&F of 15 mm CP finish brass body wall mixer conforming to IS 8931 with center
distance 150 mm conforming to IS 8931
332 TBSP-F.V-03 S&F of 15 mm premium variety Chromium plated finish brass body wall mixer with
hand shower with a provision for over head shower with 115 mm long bend pipe on
upper side, connecting legs & wall flanges conforming to IS 8931 with 7 - 10 years
warranty
333 TBSP-F.V-04 S&F of 15 mm brass forged body concealed diverter with regular flow
334 TBSP-F.V-05 S&F of 15 mm brass forged body concealed diverter with high flow
335 TBSP-F.V-06 S&F of 15 mm brass forged body concealed diverter forged body with 3 way in let
336 TBSP-F.V-07 S&F of 15 mm central hole Chromium plated finish brass body basin mixer 450 mm
long pipe for hot & cold water mixing conforming to IS 8931 and with 7 - 10 years
warranty
337 TBSP-F.V-08 S&F of 15 mm central hole Chromium plated finish brass body single lever basin
mixer 450 mm long breaded pipe for hot & cold water mixing conforming to IS 8931
and with 7 - 10 years warranty
338 TBSP-F.V-09 S&F of 15 mm central hole Chromium plated finish brass body sink mixer with
swinging cascade round shape spout (wall/ table mounted model) with connecting
legs & wall flanges conforming to IS 8931 and with 7 - 10 years warranty
343 TBSP-F.VI-05 S&F 15 mm nominal size CP finish brass over head shower arm of 450 mm long
with 90 degree bend & wall flange suitable for rain shower
344 TBSP-F.VI-06 S&F 15 mm nominal size Chromium plated finish brass over head shower arm of
450 mm long with 90 degree bend & wall flange suitable for rain shower and with 7 -
10 years warranty
345 TBSP-F.VI-07 S&F 15 mm nominal size over head 5 flow round massage shower
346 TBSP-F.VI-08 S&F 15 mm nominal size 5 flow hand shower with rubbit cleaning system and 1.5 m
long flexible hose and wall hook.
VII SUB-SECTION MISCELLANEOUS CP FITTINGS
347 TBSP-F.VII-01 S&F of 15 mm Stainless steel flexible hose 1.0 m long for hand shower / health
faucet with brass nuts
348 TBSP-F.VII-02 S&F of 15 mm CP finish brass body health faucet gun
349 TBSP-F.VII-03 S&F CP finish brass bottle trap 250 mm long with wall connection pipe & wall Flange
350 TBSP-F.VII-04 S&F CP finish brass bottle trap 190mm long with wall connection pipe & wall Flange
351 TBSP-F.VII-05 S&F PVC bottle trap with wall connection pipe
352 TBSP-F.VII-06 S&F CP finish brass body 32 mm dia nominal size waste coupling with half/full
thread & brass check nut conforming to IS 2963: 1979
353 TBSP-F.VII-07 S&F CP finish brass body 32 mm dia nominal size waste coupling with half/ full
thread & brass body check nut and chain & plug conforming to IS 2963: 1979
354 TBSP-F.VII-08 S&F CP finish brass body 32 mm dia nominal size waste coupling doom type with
half/ full thread & brass body check nut conforming to IS 2963: 1979
355 TBSP-F.VII-09 S&F brass body CP spreader for urinals
356 TBSP-F.VII-10 S&F CP finish steel towel rod of 600 mm long and 20 mm dia with brackets
357 TBSP-F.VII-11 S&F CP finish brass towel rod 600 mm long and 20 mm dia with brackets
358 TBSP-F.VII-12 S&F of Towel rod 24 " premium make powder coated stainless steel body with 7 - 10
years warranty
359 TBSP-F.VII-13 S&F CP finish brass wall mounted towel ring
360 TBSP-F.VII-14 S&F of Chromium plated finish stainless steel body Towel Ring with 7 - 10 years
warranty
361 TBSP-F.VII-15 S&F of powder coated brass body finish Towel ring premium make with 7 - 10 years
warranty
362 TBSP-F.VII-16 S&F of Chromium plated finish stainless steel body towel rail 24'' with 7 - 10 years
warranty
363 TBSP-F.VII-17 S&F powder coated stainless steel body wall mounted towel rack 600 mm long
364 TBSP-F.VII-18 S&F CP finish brass metal body single coat hook
365 TBSP-F.VII-19 S&F CP finish brass robe hook
366 TBSP-F.VII-20 Supply & Fixing Double coat hook with 7 - 10 years warranty
367 TBSP-F.VII-21 S&F CP finish brass soap dish
368 TBSP-F.VII-22 S&F Stainless steel liquid soap container wall mounted and bottle type
369 TBSP-F.VII-23 S&F premium make wall mirror with provision for over head shower and 115 mm
long bend pipe with wall flange and with 7 - 10 years warranty
370 TBSP-F.VII-24 S&F premium make wall mirror with provision for over head shower and 115 mm
long bend pipe with wall flange powder coated with 7 - 10 years warranty
371 TBSP-F.VII-25 S&F of Chromium plated finish stainless steel body Toilet paper holder with 7 - 10
years warranty
372 TBSP-F.VII-26 S&F Stainless steel 4" dia round Grating with frame for nahany or floor trap cover
with or without hole
373 TBSP-F.VII-27 S&F Stainless steel 5" square Grating with frame for nahany or floor trap cover with
or without hole
374 TBSP-F.VII-28 S&F Stainless steel 4" dia round Grating for nahany or floor trap cover with
cockroach trap with or without hole
375 TBSP-F.VII-29 S&F Stainless steel 5" square Grating for nahany or floor trap cover with cockroach
trap with or without hole
376 TBSP-F.VII-30 S&F brass body plumber union of size 31.75 mm dia with check nut
377 TBSP-F.VII-31 S&F brass body plumber union of size 38.1 mm dia with check nut
378 TBSP-F.VII-32 S&F 4" dia CP thimble pipe: 150 mm long
379 TBSP-F.VII-33 S&F 4" dia CP thimble pipe: 220 mm long
380 TBSP-F.VII-34 S&F 4" dia CP thimble pipe: 300 mm long
381 TBSP-F.VII-35 S&F CP long bend
382 TBSP-F.VII-36 S&F CP short bend
383 TBSP-F.VII-37 Supply & fixing of LLC handle set 1st quality
384 TBSP-F.VII-38 S & F premium make copper pipe 450 mm long with nuts & washers with 7 - 10
years warranty
385 TBSP-F.VII-39 S & F premium make copper pipe 450 mm long with nuts & washers power colour
coated and with 7 - 10 years warranty
386 TBSP-F.VII-40 S&F of Chromium plated finish stainless steel body Tumbler holder with 7 - 10 years
warranty
387 TBSP-F.VII-41 S&F of Chromium plated finish stainless steel body Glass shelf 22'' with 7 - 10 years
warranty
VIII SUB-SECTION LABOUR CHARGES
388 TBSP-F.VIII-01 Labour charges for fixing all types of CP TapS&Faucets
389 TBSP-F.VIII-02 Labour charges for fixing all types of CP Stop & Angle Valves
390 TBSP-F.VIII-03 Labour charges for fixing all types of wall combination taps, mixers & diverters
391 TBSP-F.VIII-04 Labour charges for fixing all types of miscellaneous CP fittings
392 TBSP-F.VIII-05 Mechanical Cleaning of water sumps with pumps & UV disinfecting
SECTION G.I. PIPES&FITTINGS (Materials shall be procured from the list of
G approved Brands/ Manufacturers/ Suppliers)
I SUB-SECTION G.I. PIPES
393 TBSP-G.I-01 S&F 15 mm Nominal Bore GI pipe Light Grade properties & weight as per IS
1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour
charges complete
394 TBSP-G.I-02 S&F 20 mm Nominal Bore GI pipe Light Grade properties & weight as per IS
1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour
charges complete
395 TBSP-G.I-03 S&F 25 mm Nominal Bore GI pipe Light Grade properties
& weight as per IS 1239 ISI mark with GI fittings including
the cost of pipe & its fittings & labour charges complete
396 TBSP-G.I-04 S&F 32 mm Nominal Bore GI pipe Light Grade properties
& weight as per IS 1239 ISI mark with GI fittings including
the cost of pipe & its fittings & labour charges complete
397 TBSP-G.I-05 S&F 40 mm Nominal Bore GI pipe Light Grade properties
& weight as per IS 1239 ISI mark with GI fittings including
the cost of pipe & its fittings & labour charges complete
398 TBSP-G.I-06 S&F 50 mm Nominal Bore GI pipe Light Grade properties
& weight as per IS 1239 ISI mark with GI fittings including
the cost of pipe & its fittings & labour charges complete
399 TBSP-G.I-07 S&F 15 mm Nominal Bore GI pipe Medium Grade
properties & weight as per IS 1239 ISI mark with GI
fittings including the cost of pipe & its fittings & labour
charges complete
400 TBSP-G.I-08 S&F 20 mm Nominal Bore GI pipe Medium Grade
properties & weight as per IS 1239 ISI mark with GI
fittings including the cost of pipe & its fittings & labour
charges complete
401 TBSP-G.I-09 S&F 25 mm Nominal Bore GI pipe Medium Grade
properties & weight as per IS 1239 ISI mark with GI
fittings including the cost of pipe & its fittings & labour
402 TBSP-G.I-10 S&F 32 mm Nominal Bore GI pipe Medium Grade
charges complete
properties & weight as per IS 1239 ISI mark with GI
fittings including the cost of pipe & its fittings & labour
403 TBSP-G.I-11 S&F
charges40complete
mm Nominal Bore GI pipe Medium Grade
properties & weight as per IS 1239 ISI mark with GI
fittings including the cost of pipe & its fittings & labour
404 TBSP-G.I-12 S&F 50 mm Nominal Bore GI pipe Medium Grade
charges complete
properties & weight as per IS 1239 ISI mark with GI
fittings including the cost of pipe & its fittings & labour
405 TBSP-G.I-13 S&F 65 mm Nominal Bore GI pipe Medium Grade
charges complete
properties & weight as per IS 1239 ISI mark with GI
fittings including the cost of pipe & its fittings & labour
charges complete
684 TBSP-J.III-15 Supply of 32mm x 2.9mm PN 10/PPR pipe conforming to DIN Standards
8077/8079
685 TBSP-J.III-16 Supply of 40mm x 3.7mm PN 10/PPR pipe conforming to DIN Standards
8077/8079
686 TBSP-J.III-17 Supply of 50mm x 4.6mm PN 10/PPR pipe conforming to DIN Standards
8077/8080
687 TBSP-J.III-18 Supply of 63mm x 5.8mm PN 10/PPR pipe conforming to DIN Standards
8077/8081
688 TBSP-J.III-19 Supply of 75mm x 6.8mm PN 10/PPR pipe conforming to DIN Standards
8077/8082
689 TBSP-J.III-20 Supply of 90mm x 8.2mm PN 10/PPR pipe conforming to DIN Standards
8077/8083
690 TBSP-J.III-21 Supply of 110mm x 10mm PN 10/PPR pipe conforming to DIN Standards
8077/8084
691 TBSP-J.III-22 Supply of 20mm x 2.8mm PN 16/PPR pipe conforming to DIN Standards
8077/8078
692 TBSP-J.III-23 Supply of 25mm x 3.5mm PN 16/PPR pipe conforming to DIN Standards
8077/8078
693 TBSP-J.III-24 Supply of 32mm x 4.4mm PN 16/PPR pipe conforming to DIN Standards
8077/8079
694 TBSP-J.III-25 Supply of 40mm x 5.5mm PN 16/PPR pipe conforming to DIN Standards
8077/8079
695 TBSP-J.III-26 Supply of 50mm x 6.9mm PN 16/PPR pipe conforming to DIN Standards
8077/8080
696 TBSP-J.III-27 Supply of 63mm x 8.6mm PN 16/PPR pipe conforming to DIN Standards
8077/8081
697 TBSP-J.III-28 Supply of 75mm x 10.3mm PN 16/PPR pipe conforming to DIN Standards
8077/8082
698 TBSP-J.III-29 Supply of 90mm x 12.3mm PN 16/PPR pipe conforming to DIN Standards
8077/8083
699 TBSP-J.III-30 Supply of 110mm x 15.1mm PN 16/PPR pipe conforming to DIN Standards
8077/8084
700 TBSP-J.III-31 Supply of 20mm x 3.4mm PN 20/PPR pipe conforming to DIN Standards
8077/8078
701 TBSP-J.III-32 Supply of 25mm x 4.2mm PN 20/PPR pipe conforming to DIN Standards
8077/8078
702 TBSP-J.III-33 Supply of 32mm x 5.4mm PN 20/PPR pipe conforming to DIN Standards
8077/8079
703 TBSP-J.III-34 Supply of 40mm x 6.7mm PN 20/PPR pipe conforming to DIN Standards
8077/8079
704 TBSP-J.III-35 Supply of 50mm x 8.3mm PN 20/PPR pipe conforming to DIN Standards
8077/8080
705 TBSP-J.III-36 Supply of 63mm x 10.5mm PN 20/PPR pipe conforming to DIN Standards
8077/8081
706 TBSP-J.III-37 Supply of 75mm x 12.5mm PN 20/PPR pipe conforming to DIN Standards
8077/8082
707 TBSP-J.III-38 Supply of 90mm x 15mm PN 20/PPR pipe conforming to DIN Standards
8077/8083
708 TBSP-J.III-39 Supply of 110mm x 18.3mm PN 20/PPR pipe conforming to DIN Standards
8077/8084
709 TBSP-J.III-40 Supply of 20mm PPR Socket conforming to DIN Standards 8077/8084
710 TBSP-J.III-41 Supply of 25mm PPR Socket conforming to DIN Standards 8077/8085
711 TBSP-J.III-42 Supply of 32mm PPR Socket conforming to DIN Standards 8077/8086
712 TBSP-J.III-43 Supply of 40mm PPR Socket conforming to DIN Standards 8077/8087
713 TBSP-J.III-44 Supply of 50mm PPR Socket conforming to DIN Standards 8077/8088
714 TBSP-J.III-45 Supply of 63mm PPR Socket conforming to DIN Standards 8077/8089
715 TBSP-J.III-46 Supply of 75mm PPR Socket conforming to DIN Standards 8077/8090
716 TBSP-J.III-47 Supply of 90mm PPR Socket conforming to DIN Standards 8077/8091
717 TBSP-J.III-48 Supply of 110mm PPR Socket conforming to DIN Standards 8077/8092
718 TBSP-J.III-49 Supply of 32mm PPR Core Flange conforming to DIN Standards 8077/8086
719 TBSP-J.III-50 Supply of 40mm PPR Core Flange conforming to DIN Standards 8077/8087
720 TBSP-J.III-51 Supply of 50mm PPR Core Flange conforming to DIN Standards 8077/8088
721 TBSP-J.III-52 Supply of 63mm PPR Core Flange conforming to DIN Standards 8077/8089
722 TBSP-J.III-53 Supply of 75mm PPR Core Flange conforming to DIN Standards 8077/8090
723 TBSP-J.III-54 Supply of 90mm PPR Core Flange conforming to DIN Standards 8077/8091
724 TBSP-J.III-55 Supply of 110mm PPR Core Flange conforming to DIN Standards 8077/8092
725 TBSP-J.III-56 Supply of 20mm PPR Elbow conforming to DIN Standards 8077/8084
726 TBSP-J.III-57 Supply of 25mm PPR Elbow conforming to DIN Standards 8077/8085
727 TBSP-J.III-58 Supply of 32mm PPR Elbow conforming to DIN Standards 8077/8086
728 TBSP-J.III-59 Supply of 40mm PPR Elbow conforming to DIN Standards 8077/8087
729 TBSP-J.III-60 Supply of 50mm PPR Elbow conforming to DIN Standards 8077/8088
730 TBSP-J.III-61 Supply of 63mm PPR Elbow conforming to DIN Standards 8077/8089
731 TBSP-J.III-62 Supply of 75mm PPR Elbow conforming to DIN Standards 8077/8090
732 TBSP-J.III-63 Supply of 90mm PPR Elbow conforming to DIN Standards 8077/8091
733 TBSP-J.III-64 Supply of 110mm PPR Elbow conforming to DIN Standards 8077/8092
734 TBSP-J.III-65 Supply of 20mm PPR Tee conforming to DIN Standards 8077/8084
735 TBSP-J.III-66 Supply of 25mm PPR Tee conforming to DIN Standards 8077/8085
736 TBSP-J.III-67 Supply of 32mm PPR Tee conforming to DIN Standards 8077/8086
737 TBSP-J.III-68 Supply of 40mm PPR Tee conforming to DIN Standards 8077/8087
738 TBSP-J.III-69 Supply of 50mm PPR Tee conforming to DIN Standards 8077/8088
739 TBSP-J.III-70 Supply of 63mm PPR Tee conforming to DIN Standards 8077/8089
740 TBSP-J.III-71 Supply of 75mm PPR Tee conforming to DIN Standards 8077/8090
741 TBSP-J.III-72 Supply of 90mm PPR Tee conforming to DIN Standards 8077/8091
742 TBSP-J.III-73 Supply of 110mm PPR Tee conforming to DIN Standards 8077/8092
743 TBSP-J.III-74 Supply of 20mm PPR End Cap conforming to DIN Standards 8077/8084
744 TBSP-J.III-75 Supply of 25mm PPR End Cap conforming to DIN Standards 8077/8085
745 TBSP-J.III-76 Supply of 32mm PPR End Cap conforming to DIN Standards 8077/8086
746 TBSP-J.III-77 Supply of 40mm PPR End Cap conforming to DIN Standards 8077/8087
747 TBSP-J.III-78 Supply of 50mm PPR End Cap conforming to DIN Standards 8077/8088
748 TBSP-J.III-79 Supply of 63mm PPR End Cap conforming to DIN Standards 8077/8089
749 TBSP-J.III-80 Supply of 75mm PPR End Cap conforming to DIN Standards 8077/8090
750 TBSP-J.III-81 Supply of 90mm PPR End Cap conforming to DIN Standards 8077/8091
751 TBSP-J.III-82 Supply of 110mm PPR End Cap conforming to DIN Standards 8077/8092
752 TBSP-J.III-83 Supply of 25mm x 20mm PPR Reducer conforming to DIN Standards 8077/8092
753 TBSP-J.III-84 Supply of 32mm x 25mm PPR Reducer conforming to DIN Standards 8077/8092
754 TBSP-J.III-85 Supply of 32mm x 20mm PPR Reducer conforming to DIN Standards 8077/8092
755 TBSP-J.III-86 Supply of 40mm x 32mm PPR Reducer conforming to DIN Standards 8077/8092
756 TBSP-J.III-87 Supply of 40mm x 25mm PPR Reducer conforming to DIN Standards 8077/8092
757 TBSP-J.III-88 Supply of 40mm x 20mm PPR Reducer conforming to DIN Standards 8077/8092
758 TBSP-J.III-89 Supply of 50mm x 20mm PPR Reducer conforming to DIN Standards 8077/8092
759 TBSP-J.III-90 Supply of 50mm x 25mm PPR Reducer conforming to DIN Standards 8077/8092
760 TBSP-J.III-91 Supply of 50mm x 32mm PPR Reducer conforming to DIN Standards 8077/8092
761 TBSP-J.III-92 Supply of 50mm x 40mm PPR Reducer conforming to DIN Standards 8077/8092
762 TBSP-J.III-93 Supply of 63mm x 20mm PPR Reducer conforming to DIN Standards 8077/8092
763 TBSP-J.III-94 Supply of 63mm x 25mm PPR Reducer conforming to DIN Standards 8077/8092
764 TBSP-J.III-95 Supply of 63mm x 32mm PPR Reducer conforming to DIN Standards 8077/8092
765 TBSP-J.III-96 Supply of 63mm x 40mm PPR Reducer conforming to DIN Standards 8077/8092
766 TBSP-J.III-97 Supply of 63mm x 50mm PPR Reducer conforming to DIN Standards 8077/8092
767 TBSP-J.III-98 Supply of 75mm x 40mm PPR Reducer conforming to DIN Standards 8077/8092
768 TBSP-J.III-99 Supply of 75mm x 50mm PPR Reducer conforming to DIN Standards 8077/8092
769 TBSP-J.III-100 Supply of 75mm x 63mm PPR Reducer conforming to DIN Standards 8077/8092
770 TBSP-J.III-101 Supply of 90mm x 63mm PPR Reducer conforming to DIN Standards 8077/8092
771 TBSP-J.III-102 Supply of 90mm x 75mm PPR Reducer conforming to DIN Standards 8077/8092
772 TBSP-J.III-103 Supply of 110mm x 63mm PPR Reducer conforming to DIN Standards 8077/8092
773 TBSP-J.III-104 Supply of 110mm x 75mm PPR Reducer conforming to DIN Standards 8077/8092
774 TBSP-J.III-105 Supply of 110mm x 90mm PPR Reducer conforming to DIN Standards 8077/8092
775 TBSP-J.III-106 Supply of 25mm x 20mm x 25mm PPR Reducer Tee conforming to
DIN Standards 8077/8092
776 TBSP-J.III-107 Supply of 32mm x 25mm x 32mm PPR Reducer Tee conforming to
DIN Standards 8077/8092
777 TBSP-J.III-108 Supply of 32mm x 20mm x 32mm PPR Reducer Tee
conforming to DIN Standards 8077/8092
778 TBSP-J.III-109 Supply of 40mm x 20mm x 40mm PPR Reducer Tee
conforming to DIN Standards 8077/8092
779 TBSP-J.III-110 Supply of 40mm x 25mm x 40mm PPR Reducer Tee
conforming to DIN Standards 8077/8092
780 TBSP-J.III-111 Supply of 40mm x 32mm x 40mm PPR Reducer Tee
conforming to DIN Standards 8077/8092
781 TBSP-J.III-112 Supply of 50mm x 20mm x 50mm PPR Reducer Tee
conforming to DIN Standards 8077/8092
782 TBSP-J.III-113 Supply of 50mm x 25mm x 50mm PPR Reducer Tee
conforming to DIN Standards 8077/8092
783 TBSP-J.III-114 Supply of 50mm x 32mm x 50mm PPR Reducer Tee
conforming to DIN Standards 8077/8092
784 TBSP-J.III-115 Supply of 50mm x 40mm x 50mm PPR Reducer Tee
conforming to DIN Standards 8077/8092
785 TBSP-J.III-116 Supply of 63mm x 20mm x 63mm PPR Reducer Tee
conforming to DIN Standards 8077/8092
786 TBSP-J.III-117 Supply of 63mm x 25mm x 63mm PPR Reducer Tee
conforming to DIN Standards 8077/8092
787 TBSP-J.III-118 Supply of 63mm x 32mm x 63mm PPR Reducer Tee
conforming to DIN Standards 8077/8092
788 TBSP-J.III-119 Supply of 63mm x 40mm x 63mm PPR Reducer Tee
conforming to DIN Standards 8077/8092
789 TBSP-J.III-120 Supply of 63mm x 50mm x 63mm PPR Reducer Tee
conforming to DIN Standards 8077/8092
790 TBSP-J.III-121 Supply of 75mm x 50mm x 75mm PPR Reducer Tee
conforming to DIN Standards 8077/8092
791 TBSP-J.III-122 Supply of 75mm x 63mm x 75mm PPR Reducer Tee
conforming to DIN Standards 8077/8092
792 TBSP-J.III-123 Supply of 90mm x 50mm x 90mm PPR Reducer Tee
conforming to DIN Standards 8077/8092
793 TBSP-J.III-124 Supply of 90mm x 63mm x 90mm PPR Reducer Tee
conforming to DIN Standards 8077/8092
794 TBSP-J.III-125 Supply of 110mm x 75mm x 110mm PPR Reducer Tee
conforming to DIN Standards 8077/8092
795 TBSP-J.III-126 Supply of 110mm x 90mm x 110mm PPR Reducer Tee
conforming to DIN Standards 8077/8092
796 TBSP-J.III-127 Supply of 20mm x ½” PPR Female Threaded Adaptor
conforming to DIN Standards 8077/8092
797 TBSP-J.III-128 Supply of 25mm x ½” PPR Female Threaded Adaptor
conforming to DIN Standards 8077/8092
798 TBSP-J.III-129 Supply of 25mm x ¾” PPR Female Threaded Adaptor
conforming to DIN Standards 8077/8092
799 TBSP-J.III-130 Supply of 32mm x ½” PPR Female Threaded Adaptor
conforming to DIN Standards 8077/8092
800 TBSP-J.III-131 Supply of 32mm x ¾” PPR Female Threaded Adaptor
conforming to DIN Standards 8077/8092
801 TBSP-J.III-132 Supply of 32mm x 1" PPR Female Threaded Adaptor
conforming to DIN Standards 8077/8092
802 TBSP-J.III-133 Supply of 40mm x 1¼” PPR Female Threaded Adaptor
conforming to DIN Standards 8077/8092
803 TBSP-J.III-134 Supply of 50mm x 1½” PPR Female Threaded Adaptor
conforming to DIN Standards 8077/8092
804 TBSP-J.III-135 Supply of 63mm x 2" PPR Female Threaded Adaptor
conforming to DIN Standards 8077/8092
805 TBSP-J.III-136 Supply of 75mm x 2½”PPR Female Threaded Adaptor
conforming to DIN Standards 8077/8092
806 TBSP-J.III-137 Supply of 20mm x ½” PPR Male Threaded Adaptor
conforming to DIN Standards 8077/8092
807 TBSP-J.III-138 Supply of 25mm x ½” PPR Male Threaded Adaptor
conforming to DIN Standards 8077/8092
808 TBSP-J.III-139 Supply of 25mm x ¾” PPR Male Threaded Adaptor
conforming to DIN Standards 8077/8092
809 TBSP-J.III-140 Supply of 32mm x ¾” PPR Male Threaded Adaptor
conforming to DIN Standards 8077/8092
810 TBSP-J.III-141 Supply of 32mm x 1" PPR Male Threaded Adaptor
conforming to DIN Standards 8077/8092
811 TBSP-J.III-142 Supply of 40mm x 1¼” PPR Male Threaded Adaptor
conforming to DIN Standards 8077/8092
812 TBSP-J.III-143 Supply of 50mm x 1½” PPR Male Threaded Adaptor
conforming to DIN Standards 8077/8092
813 TBSP-J.III-144 Supply of 63mm x 2" PPR Male Threaded Adaptor
conforming to DIN Standards 8077/8092
814 TBSP-J.III-145 Supply of 75mm x 2½”PPR Male Threaded Adaptor
conforming to DIN Standards 8077/8092
815 TBSP-J.III-146 Supply of 20mm x ½” PPR Female Threaded Elbow
conforming to DIN Standards 8077/8092
837 TBSP-J.III-168 Supply of 32mm x 1" PPR Male Threaded Tee conforming
to DIN Standards 8077/8092
850 TBSP-J.III-181 Supply of 20mm PPR Union conforming to DIN Standards 8077/8092
851 TBSP-J.III-182 Supply of 25mm PPR Union conforming to DIN Standards 8077/8092
852 TBSP-J.III-183 Supply of 32mm PPR Union conforming to DIN Standards 8077/8092
853 TBSP-J.III-184 Supply of 20mm PPR Ball Valve conforming to DIN Standards 8077/8092
854 TBSP-J.III-185 Supply of 25mm PPR Ball Valve conforming to DIN Standards 8077/8092
855 TBSP-J.III-186 Supply of 32mm PPR Ball Valve conforming to DIN Standards 8077/8092
856 TBSP-J.III-187 Supply of 40mm PPR Ball Valve conforming to DIN Standards 8077/8092
857 TBSP-J.III-188 Supply of 50mm PPR Ball Valve conforming to DIN Standards 8077/8092
858 TBSP-J.III-189 Supply of 63mm PPR Ball Valve conforming to DIN Standards 8077/8092
859 TBSP-J.III-190 Supply of 75mm PPR Ball Valve conforming to DIN Standards 8077/8092
860 TBSP-J.III-191 Supply of 90mm PPR Ball Valve conforming to DIN Standards 8077/8092
861 TBSP-J.III-192 Supply of 20mm PPR Clamp conforming to DIN Standards 8077/8092
862 TBSP-J.III-193 Supply of 25mm PPR Clamp conforming to DIN Standards 8077/8092
863 TBSP-J.III-194 Supply of 32mm PPR Clamp conforming to DIN Standards 8077/8092
864 TBSP-J.III-195 Supply of 40mm PPR Clamp conforming to DIN Standards 8077/8092
NOTE
1 All the items to be used on work are of first quality & ISI and as approved by the Engineer In charge of the
2 RATES
Note: All the prices of the material given in this section are landing costs, including material
VAT,
a) loading,
Supply cost
Rates for of
all conveyance, unloading
the materials are & stacking
based on at site.
market rates plus Sales Tax/ Material VAT.
3 b) Works Contract VAT for General/ Composition Scheme on finished items may be allowed as
applicable.
LABOUR charges have been increased based on the Common SoR
Coloured porcelain items: 50% extra may be allowed on basic cost of white porcelain items
excluding
SoR Ratesfittings
for sanitary & water supply items are purely for the guidance of the officers in preparation
of estimates vide Para 113 of APPWD code. Authority who prepares the estimate is however
responsible for proper rates as envisaged in Para 45 of APPWD code.
September 2018-19
4 5
Unit Rate
1 RM 491.00
1 RM 423.00
1 RM 708.00
1 RM 630.00
1 RM 138.00
1 RM 237.00
1 RM 95.00
1 RM 178.00
Each 619.00
1 RM 188.00
1 RM 326.00
1 RM 504.00
1 RM 922.00
1 RM 1330.00
1 RM 1810.00
1 RM 233.00
1 RM 346.00
1 RM 622.00
1 RM 977.00
1 RM 1502.00
1 RM 1947.00
1 RM 2242.00
1 RM 2863.00
1 RM 297.00
1 RM 431.00
1 RM 763.00
1 RM 1159.00
1 RM 1619.00
1 RM 2055.00
1 RM 2365.00
1 RM 3219.00
1 RM 95.00
Each 176.00
Each 330.00
Each 668.00
Each 849.00
Each 1060.00
Each 182.00
Each 268.00
Each 292.00
Each 416.00
Each 487.00
Each 558.00
Each 657.00
Each 866.00
Each 1071.00
Each 1283.00
Each 935.00
Each 1197.00
Each 1468.00
Each 1724.00
Each 1985.00
Each 1166.00
Each 1496.00
Each 1823.00
Each 2150.00
Each 2480.00
Each 2805.00
Each 35.00
Each 67.00
Each 125.00
Each 217.00
Each 343.00
Each 430.00
Each 264.00
Each 193.00
Each 330.00
Each 534.00
Each 40.00
Each 58.00
Each 78.00
Each 130.00
1 RM 252.00
1 RM 313.00
1 RM 40.00
1 RM 54.00
Each 33.00
Each 7338.00
Each 11694.00
Each 7321.00
Each 11,649.00
Each 6324.00
Each 3813.00
Each 473.00
Each 76.00
Each 732.00
Each 124.00
Each 20.00
Each 50.00
Each 2013.00
Each 2998.00
Each 65.00
Each 1295.00
Each 2674.00
Each 130.00
1 RM 751.00
1 RM 988.00
1 RM 1580.00
1 RM 822.00
1 RM 1097.00
1 RM 1821.00
Each 293.00
Each 372.00
Each 617.00
Each 363.00
Each 450.00
Each 983.00
Each 457.00
Each 715.00
Each 1695.00
Each 384.00
Each 526.00
Each 1262.00
Each 696.00
Each 846.00
Each 1977.00
Each 602.00
Each 790.00
Each 1851.00
Each 295.00
Each 412.00
Each 899.00
Each 351.00
Each 468.00
Each 921.00
Each 406.00
Each 526.00
Each 1070.00
Each 533.00
Each 653.00
Each 326.00
Each 179.00
Each 225.00
Each 645.00
1 RM 246.00
Each 78.00
Each 98.00
Each 106.00
Each 49.00
Each 64.00
Each 207.00
Each 415.00
Each 1484.00
Each 1975.00
Each 3620.00
Each 1647.00
Each 2222.00
Each 1334.00
Each 1782.00
Each 1194.00
Each 1587.00
Each 971.00
Each 1267.00
Each 1021.00
Each 1267.00
Each 354.00
Each 407.00
Each 508.00
Each 583.00
Each 1112.00
Each 699.00
Each 772.00
Each 1393.00
Each 1072.00
Each 1447.00
Each 1180.00
Each 1766.00
Each 365.00
Each 429.00
Each 1022.00
Each 377.00
Each 489.00
Each 1118.00
Each 365.00
Each 429.00
Each 1022.00
Each 377.00
Each 489.00
Each 1118.00
Each 742.00
Each 866.00
Each 388.00
Each 496.00
Each 1053.00
Each 489.00
Each 659.00
Each 1360.00
Each 576.00
Each 765.00
Each 1436.00
Each 576.00
Each 765.00
Each 1685.00
Each 631.00
Each 844.00
Each 1816.00
Each 668.00
Each 898.00
Each 744.00
Each 937.00
Each 744.00
Each 937.00
Each 785.00
Each 1017.00
Each 460.00
Each 538.00
Each 1093.00
Each 315.00
Each 382.00
Each 785.00
Each 278.00
Each 315.00
Each 707.00
Each 403.00
Each 489.00
Each 987.00
Each 440.00
Each 576.00
Each 1149.00
Each 926.00
Each 996.00
Each 532.00
Each 724.00
Each 965.00
Each 576.00
Each 790.00
Each 905.00
Each 905.00
Each 562.00
Each 770.00
Each 481.00
Each 750.00
Each 750.00
Each 750.00
Each 750.00
Each 794.00
Each 794.00
Each 848.00
Each 1110.00
Each 1203.00
Each 1272.00
Each 1554.00
Each 1611.00
Each 2263.00
Each 1799.00
Each 2486.00
Each 1799.00
Each 2486.00
Each 2006.00
Each 2730.00
Each 865.00
Each 865.00
Each 1306.00
Each 1373.00
Pair 210.00
Each 271.00
Each 81.00
Each 1534.00
Each 1619.00
Each 5440.00
Each 7986.00
Each 11672.00
Each 14866.00
Each 8478.00
Each 11352.00
Each 13392.00
Each 2089.00
Each 1442.00
Each 3246.00
Each 734.00
Each 1460.00
Each 2237.00
Each 1981.00
Each 2428.00
Each 1469.00
Each 1789.00
Each 1278.00
Each 1661.00
Each 3491.00
Each 4087.00
Each 4599.00
Each 2250.00
Each 1036.00
Each 6224.00
Each 4907.00
Each 4448.00
Each 652.00
Each 767.00
Each 2300.00
Each 2555.00
Each 449.00
Each 328.00
Each 409.00
Pair 75.00
Each 572.00
Each 285.00
Each 287.00
Each 83.00
Each 409.00
Each 148.00
Each 57.00
Each 163.00
Each 409.00
Each 223.00
Each 543.00
Each 771.00
Each 1088.00
Each 776.00
Each 997.00
Each 2914.00
Each 694.00
Each 568.00
Each 734.00
Each 748.00
Each 997.00
Each 1088.00
Each 13176.00
Each 13176.00
Each 2183.00
Each 2291.00
Each 246.00
Each 216.00
Each 1452.00
Each 2086.00
Each 1270.00
Each 1183.00
Each 1591.00
Each 210.00
Each 224.00
Each 215.00
Each 710.00
Each 551.00
Each 862.00
Each 551.00
Each 2527.00
Each 1947.00
Each 3310.00
Each 3065.00
Each 3975.00
Each 3811.00
Each 2846.00
Each 2902.00
Each 2539.00
Each 169.00
Each 162.00
Each 155.00
Each 522.00
Each 1119.00
Each 1361.00
Each 792.00
Each 1632.00
Each 232.00
Each 191.00
Each 862.00
Each 866.00
Each 129.00
Each 212.00
Each 231.00
Each 274.00
Each 141.00
Each 360.00
Each 971.00
Each 2938.00
Each 560.00
Each 911.00
Each 1880.00
Each 1470.00
Each 3085.00
Each 368.00
Each 286.00
Each 680.00
Each 514.00
Each 409.00
Each 4996.00
Each 7858.00
Each 792.00
Each 58.00
Each 69.00
Each 150.00
Each 156.00
Each 63.00
Each 68.00
Each 375.00
Each 560.00
Each 748.00
Each 317.00
Each 159.00
Each 72.00
Each 380.00
Each 735.00
Each 991.00
Each 1948.00
Each 51.00
Each 99.00
Each 175.00
Each 99.00
1000 29.00
1 RM 166.00
1 RM 190.00
1 RM 250.00
1 RM 347.00
1 RM 392.00
1 RM 428.00
1 RM 184.00
1 RM 204.00
1 RM 268.00
1 RM 375.00
1 RM 420.00
1 RM 452.00
1 RM 802.00
Each 41.00
Each 49.00
Each 74.00
Each 92.00
Each 110.00
Each 136.00
Each 82.00
Each 50.00
Each 74.00
Each 73.00
Each 422.00
Each 346.00
Each 224.00
Each 2.00
Each 4.00
Each 4.00
Each 4.00
Each 12.00
Each 19.00
Each 25.00
Each 30.00
Each 43.00
Each 62.00
Each 73.00
Each 577.00
Each 778.00
Each 1119.00
Each 1700.00
Each 2297.00
Each 3365.00
Each 5196.00
Each 7702.00
Each 426.00
Each 623.00
Each 973.00
Each 1428.00
Each 1981.00
Each 402.00
Each 522.00
Each 790.00
Each 1088.00
Each 1315.00
Each 2086.00
Each 188.00
Each 273.00
Each 384.00
Each 681.00
Each 937.00
Each 1408.00
Each 1223.00
Each 1556.00
Each 168.00
Each 96.00
Each 62.00
Each 252.00
Each 401.00
Each 479.00
Each 285.00
Each 454.00
Each 556.00
Each 177.00
Each 274.00
Each 341.00
Each 190.00
Each 291.00
Each 352.00
Each 131.00
Each 200.00
Each 241.00
Each 110.00
Each 162.00
Each 209.00
Each 67.00
Each 111.00
Each 139.00
Each 1140.00
Each 428.00
Each 689.00
Each 819.00
Each 469.00
Each 742.00
Each 904.00
Each 281.00
Each 436.00
Each 520.00
Each 300.00
Each 454.00
Each 561.00
Each 203.00
Each 315.00
Each 383.00
Each 175.00
Each 257.00
Each 310.00
Each 113.00
Each 176.00
Each 225.00
Each 1864.00
1 Lit 7.00
Each 75.00
Each 47.00
Each 26.00
Each 89.00
Each 210.00
Each 1439.00
Each 1690.00
Each 814.00
Each 50.00
Each 70.00
Each 83.00
Each 67.00
Each 94.00
Each 107.00
Each 39.00
Each 54.00
Each 70.00
Each 67.00
Each 97.00
Each 117.00
Each 59.00
Each 89.00
Each 108.00
Each 72.00
Each 108.00
Each 129.00
Each 124.00
Each 181.00
Each 257.00
Each 198.00
Each 283.00
Each 292.00
Each 73.00
Each 117.00
Each 135.00
Each 94.00
Each 148.00
Each 170.00
Each 101.00
Each 157.00
Each 177.00
Each 131.00
Each 204.00
Each 229.00
Each 35.00
Each 50.00
Each 57.00
Each 59.00
Each 57.00
Each 79.00
Each 10.00
Each 14.00
Each 17.00
Each 19.00
Each 11.00
Each 14.00
Each 14.00
Each 15.00
Each 17.00
Each 18.00
Each 35.00
Each 187.00
Each 206.00
Each 236.00
Each 217.00
Each 225.00
Each 327.00
Each 111.00
Each 87.00
Each 108.00
Each 53.00
Each 101.00
Each 143.00
Each 111.00
Each 24.00
Each 39.00
Each 150.00
Each 116.00
Each 137.00
Each 145.00
Each 57.00
Each 64.00
Each 73.00
Each 53.00
Each 61.00
Each 64.00
Each 9.00
Each 10.00
Each 11.00
Each 10.00
Each 11.00
Each 14.00
Each 69.00
Each 90.00
Each 222.00
Each 30.00
Each 65.00
Each 117.00
Each 217.00
Each 295.00
Each 15.00
Each 25.00
Each 59.00
Each 115.00
Each 225.00
1 RM 76.00
1 RM 34.00
1 RM 57.00
Each 56.00
Each 11.00
Each 30.00
1 Rm 142.00
1 Rm 30.00
Each 96.00
Each 852.00
Each 93.00
Each 243.00
Each 219.00
Mr. 67.00
Mr. 75.00
Mr. 111.00
Rm 141.00
Rm 164.00
Each 46.00
Each 46.00
Each 46.00
Each 46.00
Each 107.00
Each 72.00
Each 47.00
Each 72.00
Each 38.00
Each 149.00
Each 129.00
Each 190.00
Each 63.00
Each 65.00
Each 44.00
Each 24.00
Each 101.00
1 RM 38.00
Each 23.00
Each 466.00
Each 10.00
Each 14.00
Each 71.00
Each 110.00
Each 198.00
1 RM 142.00
1 RM 177.00
1 RM 222.00
1 RM 298.00
1 RM 391.00
1 RM 497.00
1 RM 206.00
1 RM 247.00
1 RM 305.00
1 RM 402.00
1 RM 521.00
1 RM 659.00
1 RM 169.00
1 RM 200.00
1 RM 243.00
1 RM 314.00
1 RM 401.00
1 RM 128.00
1 RM 146.00
1 RM 193.00
1 RM 263.00
1 RM 327.00
1 RM 477.00
1 RM 141.00
1 RM 172.00
1 RM 206.00
1 RM 281.00
1 RM 348.00
1 RM 508.00
1 RM 44.00
1 RM 66.00
1 RM 105.00
1 RM 163.00
1 RM 292.00
1 RM 458.00
1 RM 637.00
1 RM 873.00
1 RM 1294.00
1 RM 60.00
1 RM 93.00
1 RM 148.00
1 RM 228.00
1 RM 408.00
1 RM 641.00
1 RM 907.00
1 RM 1293.00
1 RM 1935.00
1 RM 70.00
1 RM 107.00
1 RM 173.00
1 RM 266.00
1 RM 471.00
1 RM 743.00
1 RM 1054.00
1 RM 1432.00
1 RM 2255.00
1 RM 10.00
1 RM 14.00
1 RM 19.00
1 RM 33.00
1 RM 64.00
1 RM 122.00
1 RM 185.00
1 RM 355.00
1 RM 631.00
Each 38.00
Each 61.00
Each 79.00
Each 126.00
Each 147.00
Each 373.00
Each 482.00
Each 17.00
Each 20.00
Each 39.00
Each 68.00
Each 128.00
Each 249.00
Each 402.00
Each 748.00
Each 1388.00
Each 15.00
Each 26.00
Each 46.00
Each 82.00
Each 146.00
Each 295.00
Each 577.00
Each 837.00
Each 1449.00
Each 7.00
Each 10.00
Each 19.00
Each 33.00
Each 58.00
Each 122.00
Each 204.00
Each 325.00
Each 643.00
Each 12.00
Each 20.00
Each 19.00
Each 34.00
Each 33.00
Each 32.00
Each 50.00
Each 51.00
Each 52.00
Each 52.00
Each 113.00
Each 113.00
Each 114.00
Each 114.00
Each 115.00
Each 168.00
Each 169.00
Each 213.00
Each 408.00
Each 432.00
Each 544.00
Each 633.00
Each 683.00
Each 32.00
Each 56.00
Each 57.00
Each 92.00
Each 93.00
Each 96.00
Each 133.00
Each 134.00
Each 138.00
Each 139.00
Each 384.00
Each 386.00
Each 391.00
Each 397.00
Each 403.00
Each 542.00
Each 551.00
Each 730.00
Each 776.00
Each 1323.00
Each 1376.00
Each 102.00
Each 105.00
Each 183.00
Each 186.00
Each 193.00
Each 297.00
Each 439.00
Each 613.00
Each 816.00
Each 1572.00
Each 158.00
Each 163.00
Each 238.00
Each 249.00
Each 462.00
Each 541.00
Each 756.00
Each 1163.00
Each 1861.00
Each 109.00
Each 114.00
Each 176.00
Each 169.00
Each 197.00
Each 328.00
Each 163.00
Each 179.00
Each 237.00
Each 228.00
Each 491.00
Each 106.00
Each 115.00
Each 193.00
Each 203.00
Each 228.00
Each 320.00
Each 164.00
Each 176.00
Each 252.00
Each 257.00
Each 272.00
Each 501.00
Each 423.00
Each 633.00
Each 845.00
Each 1184.00
Each 1904.00
Each 3024.00
Each 485.00
Each 645.00
Each 845.00
Each 1057.00
Each 2009.00
Each 3384.00
Each 93.00
Each 108.00
Each 178.00
Each 169.00
Each 223.00
Each 233.00
Each 478.00
Each 556.00
Each 900.00
Each 1481.00
Each 2115.00
Each 10.00
Each 13.00
Each 15.00
Each 17.00
quality & ISI and as approved by the Engineer In charge of the work.
Rate as per PH SSR item no 25a, Pg.6 1 Sqm #REF! 10 Sqm #REF!
Add for Municipal Allowance at 20% #REF!
Overheads & Contractors Profit 13.615% #REF!
Total #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Sqm Rs #REF!
2 Cutting open C.C. road surface including stacking of excavated materials for pipe line trench work. as directed by the
departmental officers.
Rate as per PH SSR item no 25b,Pg.6 1 Cum #REF! 1 Cum #REF!
Add for Municipal Allowance at 20% #REF!
Overheads & Contractors Profit 13.615% #REF!
Total #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Cum Rs #REF!
3 Cutting open water bound macadam road including soiling and stacking of excavated materials for pipe line trench
work. as directed by the departmental officers.
Rate as per PH SSR item no 25 c,Pg.6 1 Cum #REF! 1 Cum #REF!
Add for Municipal Allowance at 20% #REF!
Overheads & Contractors Profit 13.615% #REF!
Total #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Cum Rs #REF!
1 RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation
in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out,
construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom
as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including
protecting the existing utility services wherever it is possible during the execution and taking all precautionary
measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in
trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all
incidental and operational charges etc., complete for Pipe Line trenches by manual means.
Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD and 301.2.1 of MORT&H
In ordinary soils, by Manual means for Pipe line Trenches
i up to 3.00 Mts depth below GL out put 10.00 Cum
a) Labour
Mate ( Labour- R&B-S.N.71) 0 Nos. 540.00 1 Each 0.00
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 3.64 Nos. 510.00 1 Each 1856.40
1856.40
c&d) Overheads & Contractors Profit @ 13.615% 252.75
add extra for pipe line trenches @ 75% 1392.30
Cost for 240 cum = a+b+c+d 3501.45
Rate per cum = (a+b+c+d)/10 350.15
VAT & Labour cess. 0% 0.00
a Rate per 1 Cum excluding Dewatering Rs 350.15
447524687.xlsx - data-Road
Add extra for Dewatering @ 5% 5%
Page 1604 of 2191 17.51
b Rate per 1 Cum including Dewatering Rs 367.66
2 RBR-FNDN-1- (I-B-i) - In ordinary soils up to 3.00 Mts depth below GL by Mechanical means: Earthwork
excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting
out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and
bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting
the existing utility services wherever it is possible during the execution and taking all precautionary measures in the
restricted areas for laying sewer/water lines including divertion of traffic and backfilling in trenches with excavated
suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational
charges etc., complete for Pipe Lines by mechanical means.
3 RBR-FNDN-1- (II-B) - Ordinary rock (not requiring blasting) -up to 3.00Mts. below GL by Machanical means:
Excavation in Ordinary Rock for Pipe line trenches as per drawings and technical specifications including setting out,
construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom
as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including
protecting the existing utility services wherever it is possible during the execution and taking all precautionary
measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and disposal of rock
upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by
machanical means.
4 RBR-FNDN-1- (IV) - Hard rock (blasting prohibited) -up to 3.00Mts. below GL: Excavation in Hard Rock in
habitant areas where conventional blasting can not be done for Pipe line trenches as per drawings and technical
specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious
material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by
the departmental officer including protecting the existing utility services wherever it is possible during the execution
and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of
traffic and disposal of rock upto a lead of 50 m, including all incidental and operational charges etc., complete
5 RBR-FNDN-1-A-i -manual means : Earthwork excavation for structures in all types of soils up to 3.00 Mts
depth below GL by manual means as per drawing and technical specifications including setting out, construction
of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing
of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305
MORD / 304 MORTH. for Sumps,Thrust blocks, Chambers and Man Holes etc. by manual means,
Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD and 301.2.1 of MORT&H
Ordinary Soils : for Sumps, Thrust Blocks and Man Holes etc,.
up to 3.00 Mts depth below GL out put 10.00 Cum
a) Labour
Mate ( Labour- R&B-S.N.71) 0 Nos. 540.00 1 Each 0.00
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 3.64 Nos. 510.00 1 Each 1856.40
Sub total 1856.40
c&d) Overheads & Contractors Profit 13.615% 252.75
Cost for 240 cum = a+b+c+d 2109.15
Rate per cum = (a+b+c+d)/10 210.92
VAT & Labour cess. 0% 0.00
a Rate per 1 Cum excluding Dewatering Rs 210.92
Add extra for Dewatering @ 5% 5% 10.55
b Rate per 1 Cum including Dewatering Rs 221.47
6 PHE-SHST-25: Providing shoring and shrutting for excavation of trenches for laying pipe lines including cost and
conveyance of all materials, labour charges and removal of shoring and shuttering at appropriate places as directed
by the departmental officers with all incidental and ooperational charges etc, complete.
a Single staging from 0’ to 8’-0” ( 0 to 2.5 Metre)
Depth not exceeding 1.5 M
Details of cost for an area 30 M long and 1.5 M
deep.
Area = 30 x 1.5 = 45 sqm
(a) Labour
Carpenter 2nd class ( Labour-Irrigation-Semi skilled- 0.570 day 540.00 1 day 307.80
S.N.17)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 1.100 day 510.00 1 day 561.00
b) Material
Polling boards and ballies sqm
Requirement for 45 sqm :
Polling Boards of 250 mm x 35 mm (40 x 1.5 x 0.25 0.110 cum #REF! 1 cum #REF!
x 0.038) -(Pg.310 of Irri.SSR-Sn.-47-Pg.13 Jungle
wood planks)
Ballies 125 mm dia 1.5 mts long (60 x p x (0.125)2 / 0.160 cum 3825.00 1 cum 612.00
4 x 1.5
BMC-X.05- Pg.No.104 of Bld.SSR-Casuarina Balli
Props - 3" to 4" dia - 12'-0" Height( Approx 9 Nos of
Ballies equals to 0.16Cum, cost of each balli =Rs.
68 (9x68 =612 )or 3825 for 1 Cum
Deduct–Credit for materials after use @ 80% of the #REF!
cost of materials =0.8 x X
c) Machinery
Total #REF!
Overheads & Contractors Profit 13.615% #REF!
447524687.xlsx - data-Road
(d) Cost for 45 sqm (a+b+c) Page 1606 of 2191 #REF!
Rate per each sqm = d/45 #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Sqm #REF!
b Double staging from 8’ to 14 ( 2.5 to 4.5 Metre)
Depth not exceeding 1.5 M
Details of cost for an area 30 M long and 1.5 M
deep.
Area = 30 x 1.5 = 45 Sqm
(a) Labour
Carpenter 2nd class ( Labour-Irrigation-Semi 0.500 day 540.00 1 day 270.00
skilled-S.N.17)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 1.320 day 510.00 1 day 673.20
b) Material
Polling boards and ballies sqm
Requirement for 45 sqm :
Polling Boards of 250 mm x 35 mm (40 x 1.5 x 0.25 0.110 cum #REF! 1 cum #REF!
x 0.038 = 0.57 cum)
Ballies 125 mm dia 1.5 mts long (60 x p x (0.125)2 / 0.220 cum 3825.00 1 cum 841.50
4 x 1.5 = 1.1Pg.No.104
BMC-X.05- cum of Bld.SSR-Casuarina Balli
Props - 3" to 4" dia - 12'-0" Height( Approx 9 Nos of
Ballies equals to 0.16Cum, cost of each balli =Rs.
68 (9x68 =612 )or 3825 for 1 Cum
Deduct–Credit for materials after use @ 80% of the #REF!
cost of materials =0.8 x X
c) Machinery
Total #REF!
Overheads & Contractors Profit 13.615% #REF!
(d) Cost for 45 sqm (a+b+c) #REF!
Rate per each sqm = d/45 #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Sqm #REF!
c Triple staging beyond 14’ for every 2 meter (beyond 4.5 M) Add for every 2 Mts (difference of single and double
staging) for staging beyond 4.5 mts.
Rate for 6.50m #REF!
Rate for 8.50m #REF!
Rate for 10.50m #REF!
7 PHE-BHLW-26 : Barricading, hoarding, lighting and watching etc., for water supply and sewerage works for trenches
of depths upto 6’-0” (2 Meter) below G.L
Taking output 3 Rmt
Material
Bamboos of 1 ½ ”dia 2.5 M long (5 ft c/c = 3 x 2.5) - 7.50 rmt #REF! 2.44 rmt #REF!
BMC-X.12 -Sl.No.1024, Pg.104 of Bld.SSR
Bamboos of 1 ½ ”dia 3.66 M long (5 ft c/c = 3x 10.98 rmt #REF! 2.44 rmt #REF!
3.66) - BMC-X.12 -Sl.No.1024, Pg.104 of Bld.SSR
447524687.xlsx - data-Road
Rate per 1 Rmt Page 1607 of 2191 #REF!
8 BLD-CSTN-2-8 (16) : Collection ,Supply and filling of Sand from approved quarry to work site and stacking at work
site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour charges etc.
complete as per standard specifications. Clause 305.3.9 MORD & 304 MORTH
Sand Filling out put 6.00 Cum
a) Material
Sand (C-Mat-Lead statement-S.No.1) 6.00 Cum 1303.00 1 Cum 7818.00
b) Labour
Mate ( Labour- R&B-S.N.71) 0.00 Nos 540.00 1 Nos 0.00
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 0.31 Nos 510.00 1 Nos 158.10
Sub Total 7976.10
b&c) Overheads & Contractors Profit 13.615% 1085.95
Cost for 6 cum = a+b+c 9062.05
Rate per cum = (a+b+c)/6 1510.34
VAT & Labour cess. 0% 0.00
Rate per 1 Cum 1510.34
9 BLD-CSTN-2-8 (16): Collection ,Supply and filling of Stone dust from approved quarry to work site and stacking at
work site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour
charges etc. complete as per standard specifications. Clause 305.3.9 MORD & 304 MORTH
Stone dust Filling out put 6.00 Cum
a) Material
Stone dust Filling (C-Mat-Lead statement-S.No.23) 6.00 Cum 618.70 1 Cum 3712.20
b) Labour
Mate ( Labour- R&B-S.N.71) 0.00 Nos 540.00 1 Nos 0.00
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 0.31 Nos 510.00 1 Nos 158.10
Sub Total 3870.30
b&c) Overheads & Contractors Profit 13.615% 526.94
Cost for 6 cum = a+b+c 4397.24
Rate per cum = (a+b+c)/6 732.87
VAT & Labour cess. 0% 0.00
Rate per 1 Cum 732.87
10 BLD-CSTN-2-8 (16) : Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not
exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance
of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished
item of work. (APSS NO. 309 & 310)
out put 6.00 Cum
Cost of Gravel ( C-Mat - Sn.5) 6.00 Cum 127.26 1 Cum 763.56
a) Labour
Mate ( Labour- R&B-S.N.71) 0.00 Nos 540.00 1 Nos 0.00
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 0.31 Nos 510.00 1 Nos 158.10
921.66
b&c) Overheads & Contractors Profit 13.615% 125.48
Cost for 6 cum = a+b+c 1047.14
Rate per cum = (a+b+c)/6 174.52
VAT & labour cess 0% 0.00
Rate per 1 Cum 174.52
11 BLD-CSTN-2-9 (17); Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations
and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering
and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire
charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
2 Carting of surplus excavated rock from the site to a distance suitable including loading, unloading charges, cost &
conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete.
a Rock/CC
Page No.328 of SSR, Conveyance rates - 5.00 Km 1 cum 57.10 1 Cum 57.10
VAT & Labour cess. 0% 0.00
Rate per 1 Cum Rs 57.10
b Earth
Page No.124 of SSR, Conveyance rates - 5.00 Km 1 cum 57.10 1 Cum 57.10
VAT & Labour cess. 0% 0.00
Rate per 1 Cum Rs 57.10
3 Bailing out water from the pipe line trenches with oil engine driven pump sets, including hire charges, fuel charges
and wages for Driver and Helper etc, complete,
Basic rate (item No.26/(a)/Pg 6 of PH SSR (PH 1 Hp.hr #REF! 1 Hp.hr #REF!
items)
Total Rs #REF!
Overheads & Contractors Profit 13.615% #REF!
#REF!
VAT & Labour cess. 0% #REF!
Rate per 1HPhr Rs #REF!
4 RBR-STCL-7 : Dismantling Stone Masonry as per Technical Specification Clause 202 : Dismantling of existing
structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal
of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical
Specification Clause 202 MORD / MORTH - Rubble Stone Masonry in Cement Mortar
Rubble Stone Masonry in Cement Mortar Unit 1.25 Cum
a) labour
Mate 0.000 day 540.00 1 day 0.00
Mazdoor (Unskilled) 0.780 day 510.00 1 day 397.80
b) Machinery
Tractor with trolley 3t 0.270 hour 464.80 1 hour 125.50
Total Rs 523.30
C.Overheads & Contractors Profit 14% 71.25
Total for 1.25 Cum 594.55
Total for 1 Cum 475.64
VAT & Labour cess. 0% 0.00
Rate per 1 Cum Rs 475.64
5 RBR-STCL-5 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising
of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the
dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of
1000 m as per Technical Specification Clause 202 MORD / MORTH
A Lime Concrete & CC upto M10 (Manual means) Unit 1.25 Cum
a) labour
Mate 0.000 day 540.00 1 day 0.00
Mazdoor (unskilled) 1.040 day 510.00 1 Cum 530.40
b) Machinery
447524687.xlsx - data-Road
Tractor with trolley 3t Page 1609 of0.270
2191 hour 464.80 1 hour 125.50
Total 655.90
C.Overheads & Contractors Profit 14% 89.3
Total for 1.25 Cum 745.20
Total for 1 Cum 596.16
VAT & Labour cess. 0% 0.00
Rate per 1 Cum Rs 596.16
B Cement Concrete M15 & M20 (Manual means) Unit 1.25 Cum
a) labour
Mate 0.000 day 540.00 1 day 0.00
Mazdoor (unskilled) 1.300 day 510.00 1 Cum 663.00
b) Machinery
Tractor with trolley 3t 0.270 hour 464.80 1 hour 125.50
Total 788.50
C.Overheads & Contractors Profit 14% 107.35
Total for 1.25 Cum 895.85
Total for 1 Cum 716.68
VAT & Labour cess. 0% 0.00
Rate per 1 Cum Rs 716.68
6 PHE-URCI-19 : Uprooting of C.I. pipes by melting lead, loosening the joints, separating the pipes, hoisting and
keeping within a lead of 10 metres but excluding earth work excavation and refilling
Details of cost for 40.26 m
a 80mm dia metre
(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9) 0.500 day 540.00 1 day 270.00
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 4.000 day 510.00 1 day 2040.00
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood (local market rate) 0.373 Qtl 750.00 1 Qtl 279.75
Kerosene oil (local market rate) 0.379 litre 25.00 1 litre 9.48
(c) Total = a+b 2599.23
(d) Overheads & Contractors Profit 14% 353.89
(e) Cost for 40.26 m (c+d) 2953.12
Rate per each m = e/40.26 73.35
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt Rs 73.35
d 200mm dia
(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9) 1.100 day 540.00 1 day 594.00
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 6.500 day 510.00 1 day 3315.00
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood (local market rate) 0.840 Qtl 750.00 1 Qtl 630.00
Kerosene oil (local market rate) 0.757 litre 25.00 1 litre 18.93
(c) Total = a+b 4557.93
(d) Overheads & Contractors Profit 14% 620.56
(e) Cost for 40.26 m (c+d) 5178.49
Rate per each m = e/40.26 128.63
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt Rs 128.63
e 250mm dia
(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9) 1.300 day 540.00 1 day 702.00
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 7.500 day 510.00 1 day 3825.00
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood 1.026 Qtl 750.00 1 Qtl 769.50
Kerosene oil 1.137 litre 25.00 1 litre 28.41
(c) Total = a+b 5324.91
(d) Overheads & Contractors Profit 14% 724.99
(e) Cost for 40.26 m (c+d) 6049.90
Rate per each m = e/40.26 150.27
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt Rs 150.27
f 300mm dia
447524687.xlsx - data-Road
(a) Labour Page 1611 of 2191
Assistant fitter (labour-Irri-Semi skilled.S.N.9) 1.500 day 540.00 1 day 810.00
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 8.500 day 510.00 1 day 4335.00
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood 1.120 Qtl 750.00 1 Qtl 840.00
Kerosene oil 1.515 litre 25.00 1 litre 37.88
(c) Total = a+b 6022.88
(d) Overheads & Contractors Profit 14% 820.02
(e) Cost for 40.26 m (c+d) 6842.90
Rate per each m = e/40.26 169.97
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt Rs 169.97
g 350mm dia
(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9) 1.750 day 540.00 1 day 945.00
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 9.500 day 510.00 1 day 4845.00
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood 1.231 Qtl 750.00 1 Qtl 923.25
Kerosene oil 1.515 litre 25.00 1 litre 37.88
(c) Total = a+b 6751.13
(d) Overheads & Contractors Profit 14% 919.17
(e) Cost for 40.26 m (c+d) 7670.30
Rate per each m = e/40.26 190.52
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt Rs 190.52
h 400mm dia
(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9) 2.000 day 540.00 1 day 1080.00
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 10.500 day 510.00 1 day 5355.00
b) Material
For breacking lead coulked joints, melting lead
etc.,
Fuel wood 1.306 Qtl 750.00 1 Qtl 979.50
Kerosene oil 1.894 litre 25.00 1 litre 47.35
(c) Total = a+b 7461.85
(d) Overheads & Contractors Profit 14% 1015.93
(e) Cost for 40.26 m (c+d) 8477.78
Rate per each m = e/40.26 210.58
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt Rs 210.58
i 450mm dia
(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9) 2.250 day 540.00 1 day 1215.00
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 11.500 day 510.00 1 day 5865.00
b) Material
For breacking lead coulked joints, melting lead
etc.,
Fuel wood 1.400 Qtl 750.00 1 Qtl 1050.00
Kerosene oil 2.273 litre 25.00 1 litre 56.83
(c) Total = a+b 8186.83
(d) Overheads & Contractors Profit 14% 1114.64
(e) Cost for 40.26 m (c+d) 9301.47
447524687.xlsx - data-Road
Rate per each m = e/40.26 Page 1612 of 2191 231.04
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt Rs 231.04
j 500mm dia
(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9) 2.500 day 540.00 1 day 1350.00
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 12.500 day 510.00 1 day 6375.00
b) Material
For breacking lead coulked joints, melting lead
etc.,
Fuel wood 1.492 Qtl 750.00 1 Qtl 1119.00
Kerosene oil 2.652 litre 25.00 1 litre 66.30
(c) Total = a+b 8910.30
(d) Overheads & Contractors Profit 14% 1213.14
(e) Cost for 40.26 m (c+d) 10123.44
Rate per each m = e/40.26 251.45
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt Rs 251.45
k 600mm dia
(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9) 3.000 day 540.00 1 day 1620.00
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 14.500 day 510.00 1 day 7395.00
b) Material
For breacking lead coulked joints, melting lead
etc.,
Fuel wood 1.580 Qtl 750.00 1 Qtl 1185.00
Kerosene oil 3.410 litre 25.00 1 litre 85.25
(c) Total = a+b 10285.25
(d) Overheads & Contractors Profit 14% 1400.34
(e) Cost for 40.26 m (c+d) 11685.59
Rate per each m = e/40.26 290.25
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt Rs 290.25
7 PHE-URRC-20: Uprooting of R.C.C. Pipes including breaking the collars, loosing the joint, scraping the pipe, hoisting
and keeping within a lead of 10 M but excluding earthwork excavation and refilling
Taking output 10.00 Rmt
a 100mm dia
(a) Labour
Fitter 2nd class (labour-Irri-Semi skilled.S.N.9) 0.100 day 540.00 1 day 54.00
Man mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 0.400 day 510.00 1 day 204.00
Women mazdoor ( Labour-Irrigation-Unskilled- 0.450 day 510.00 1 day 229.50
S.N.4) 487.50
(b) Overheads & Contractors Profit 14% 66.37
(c) Cost for 10 Rmt (a+b) 553.87
Rate per each Rmt = c/10 55.39
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt Rs 55.39
b 150mm dia
(a) Labour
Fitter 2nd class (labour-Irri-Semi skilled.S.N.9) 0.100 day 540.00 1 day 54.00
Man mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 0.490 day 510.00 1 day 249.90
Women mazdoor ( Labour-Irrigation-Unskilled- 0.560 day 510.00 1 day 285.60
S.N.4) 589.50
(b) Overheads & Contractors Profit 14% 80.26
447524687.xlsx - data-Road
(c) Cost for 10 Rmt (a+b) Page 1613 of 2191 669.76
Rate per each Rmt = c/10 66.98
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt Rs 66.98
c 225mm dia
(a) Labour
Fitter 2nd class (labour-Irri-Semi skilled.S.N.9) 0.100 day 540.00 1 day 54.00
Man mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 0.490 day 510.00 1 day 249.90
Women mazdoor ( Labour-Irrigation-Unskilled- 0.670 day 510.00 1 day 341.70
S.N.4) 645.60
(b) Overheads & Contractors Profit 14% 87.9
(c) Cost for 10 Rmt (a+b) 733.50
Rate per each Rmt = c/10 73.35
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt Rs 73.35
d 300mm dia
(a) Labour
Fitter 2nd class (labour-Irri-Semi skilled.S.N.9) 0.100 day 540.00 1 day 54.00
Man mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 0.490 day 510.00 1 day 249.90
Women mazdoor ( Labour-Irrigation-Unskilled- 0.790 day 510.00 1 day 402.90
S.N.4) 706.80
(b) Overheads & Contractors Profit 14% 96.23
(c) Cost for 10 Rmt (a+b) 803.03
Rate per each Rmt = c/10 80.30
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt Rs 80.30
8 PHE-URSW-21: Uprooting of old S.W. pipes including breaking of joints and bed concrete stacking of useful
materials near the site with in 50m lead and disposal of un serviceable materials in to municipal dumps excluding the
cost of earth work excavation. (Reference to specifications BIS No.)
Details of cost for 10 m
a 100mm dia metre
(a) Labour
Man mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 0.490 day 510.00 1 day 249.90
Women mazdoor ( Labour-Irrigation-Unskilled- 0.360 day 510.00 1 day 183.60
S.N.4) 433.50
(b) Overheads & Contractors Profit 14% 59.02
(c) Cost for 10 m (a+b) 492.52
Rate per each m =c/10 49.25
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt 49.25
447524687.xlsx - data-Road
c 200mm dia metre Page 1614 of 2191
(a) Labour
Man mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 0.490 day 510.00 1 day 249.90
Women mazdoor ( Labour-Irrigation-Unskilled- 0.510 day 510.00 1 day 260.10
S.N.4) 510.00
(b) Overheads & Contractors Profit 14% 69.44
(c) Cost for 10 m (a+b) 579.44
Rate per each m =c/10 57.94
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt 57.94
9 Providing temparary water supply house service connections with ISI mark GI pipes and fittings so as not to disturb
the existing water supply connections during earth work excavation for trenches and during laying of new mains in
including cost and conveyance of all materials, labour charges and with all incidental and operational charges etc.,
complete.
a 15mm Nominal bore GI pipe water supply line
S & F 15 mm Nominal Bore GI pipe Medium Grade 1 Rmt #REF! 1 Rmt #REF!
properties & weight as per IS 1239 ISI mark with GI
fittings (BMW-F.67,Sn.278) -2014-15 SSR
Add Municipal Allowence labour charges( as per 20% #REF! #REF!
-BMW-F.68 - Sn.269) -2014-15 SSR
Supply of 19/20mm PVC Flexible Pipe. as per 1 Rmt #REF! 1 Rmt #REF!
2014-15- SSR item ELEC-1.2.23, Sn.74
#REF!
c&d) Overheads & Contractors Profit 14% #REF!
Total #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!
d a) S& F 32 mm Nominal Bore GI pipe Light Grade properties & weight as per IS 1239 ISI mark with GI fittings
including the cost of pipe & its fittings & labour charges complete
32mm Nominal bore GI pipe water supply line
S & F 32 mm Nominal Bore GI pipe Medium Grade 1 Rmt #REF! 1 Rmt #REF!
properties & weight as per IS 1239 ISI mark with GI
fittings (BMW-F.73,Sn.284) 2014-15 SSR
Add Municipal Allowence labour charges( as per 20% #REF! #REF!
-BMW-F.74 - Sn.284) -2014-15 SSR
Supply of 19/20mm PVC Flexible Pipe. as per 1 Rmt #REF! 1 Rmt #REF!
2014-15- SSR item ELEC-1.2.23, Sn.74
#REF!
c&d) Overheads & Contractors Profit 14% #REF!
Total #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!
e a) S& F 40 mm Nominal Bore GI pipe Light Grade properties & weight as per IS 1239 ISI mark with GI fittings
including the cost of pipe & its fittings & labour charges complete
40mm Nominal bore GI pipe water supply line
S & F 40 mm Nominal Bore GI pipe Medium Grade 1 Rmt #REF! 1 Rmt #REF!
properties & weight as per IS 1239 ISI mark with GI
fittings (BMW-F.75,Sn.286) 2014-15- SSR
Add Municipal Allowence labour charges( as per 20% #REF! #REF!
-BMW-F.76 - Sn.287) -2014-15 SSR
Supply of 19/20mm PVC Flexible Pipe. as per 1 Rmt #REF! 1 Rmt #REF!
2014-15 SSR item ELEC-1.2.23, Sn.74
#REF!
c&d) Overheads & Contractors Profit 14% #REF!
Total #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!
f a) S& F 50 mm Nominal Bore GI pipe Light Grade properties & weight as per IS 1239 ISI mark with GI fittings
including the cost of pipe & its fittings & labour charges complete
50mm Nominal bore GI pipe water supply line
S & F 50 mm Nominal Bore GI pipe Medium Grade 1 Rmt #REF! 1 Rmt #REF!
properties & weight as per IS 1239 ISI mark with GI
fittings (BMW-F.77,Sn.288) 2014-15 SSR
447524687.xlsx - data-Road
Add Municipal Allowence labour charges( as per 20%
Page 1616 of 2191 #REF! #REF!
-BMW-F.78 - Sn.289) -2014-15 SSR
Supply of 19/20mm PVC Flexible Pipe. as per 1 Rmt #REF! 1 Rmt #REF!
2014-15 SSR item ELEC-1.2.23, Sn.74
#REF!
c&d) Overheads & Contractors Profit 14% #REF!
Total #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!
10 Providing temporary U PVC rider mains for sewage connections so as not to distrub the existing sewerage
connections during earth work excavation for trenches and during laying of new mains including cost and
conveyance of all materials, labour charges and with all incidental and operational charges etc., complete.
110mm dia U PVC 4 kg/SqCm
110mm dia PVC pipe as per data sheet 1 Rmt 215.43 1 Rmt 215.43
Lowering charges 1 Rmt 25.75 1 Rmt 25.75
Earth work Excavation charges -1x0.6*0.6 = 0.36 0.36 Cum 132.49 1 Cum 47.70
cum 288.88
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt including 14% CP Rs 336.58
11 BLD-CSTN-3-7-Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:5:10)
prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including
cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on
all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the
required level curing etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:
Cement (ENC-PH.Memo.No.146/Cement & Steel / 129.60 Kg 4.600 1 Kg 596.16
T1
Coarse aggregate 40mm graded ( C-Mat- S.No-57) 0.90 Cum Err:509 1 Cum Err:509
Fine aggregate (Sand) ( C-Mat-S.N.2 ) 0.45 Cum 1303.00 1 Cum 586.35
Water (including for curing) -M-189-b. irrigation 1.20 Kl 98.00 1 Kl 117.60
SSR
B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity 1 hour 397.50 1 hour 397.50
(Hire
C. charges-Irrigation- S.N.16)
LABOUR:
Mason 1st class (labour-Irrigation.S.N.11) 0.10 Nos 564.00 1 Nos 56.40
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 1.39 Nos 510.00 1 Nos 708.90
Sub- Total Rs Err:509
d) Overheads & Contractors Profit 14% Err:509
Rate per cu.m. Rs Err:509
VAT & labour cess 0% Err:509
Rate per 1 Cum Err:509
12 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix
(1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage
charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top
surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:
Cement-(ENC-PH.Memo.No.146/Cement&Steel / 162.00 Kg 4.60 1 Kg 745.20
T1
Coarse aggregate 40mm graded ( C-Mat- S.No-57) 0.90 Cum Err:509 1 Cum Err:509
Fine aggregate (Sand) ( C-Mat-S.N.2 ) 0.45 Cum 1303.00 1 Cum 586.35
Water (including for curing) -M-189-b. irrigation 1.20 Kl #REF! 1 Kl #REF!
SSR
B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity 1 hour 397.50 1 hour 397.50
(Hire
C. charges-Irrigation- S.N.16)
LABOUR:
447524687.xlsx - data-Road
Mason 1st class (labour-Irrigation.S.N.11) 0.10 Nos
Page 1617 of 2191 564.00 1 Nos 56.40
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 1.39 Nos 510.00 1 Nos 708.90
Grand Total Rs Err:509
Overheads & Contractors Profit 14% Err:509
Rate per cu.m. Rs Err:509
VAT & Labour cess. 0% Err:509
Rate per 1 Cum Rs Err:509
13 BLD-CSTN-3-10- ( 27 ) Hand mixing : Plain Cement concrete nominal mix (1:3:6) prop (Cement : fine aggregate:
coarse aggregate ) using 20mm size Hard Granite Machine Crushed Metal including cost and conveyance of all
materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing
etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:
Water (including for curing) -M-189-b. irrigation SSR 220.00 Kg 4.60 1 Kg 1012.00
Coarse aggregate 20mm graded (C-Mat-Sn.48) 0.90 Cum Err:509 1 Cum Err:509
Fine aggregate (Sand) 0.45 Cum 1303.00 1 Cum 586.35
Water (including for curing) 1.20 Kl #REF! 1 Kl #REF!
B. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11) 0.10 day 564.00 1 day 56.40
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 2.36 day 510.00 1 day 1203.60
Sub - Total Rs Err:509
c.Overheads & Contractors Profit 14% Err:509
Rate per cu.m. Rs Err:509
VAT & Labour cess. 0% Err:509
Rate per 1 Cum Rs Err:509
14 BLD-CSTN -3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix M-20
(Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage
charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top
surface to the required level curing etc., complete for finished item of work with nomonal reinforcement
PCC -M-20
Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1 330.00 Kg 4.60 1 Kg 1518.00
20mm HBG graded metal- ( as per Lead S.No-49) 0.90 Cum Err:509 1 Cum Err:509
Sand (C-Mat-Lead statement-S.No.1) 0.45 Cum 1303.00 1 Cum 586.35
Water (including for curing) -M-189-b. irrigation 1.20 Kl #REF! 1 Kl #REF!
SSR
Mason 1st class (labour-Irrigation.S.N.11) 0.10 Nos. 564.00 1 Each 56.40
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 1.39 Nos. 510.00 1 Each 708.90
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity 1.00 hour 397.50 1 hour 397.50
(Hire charges-Irrigation- S.N.16) Err:509
VAT & Labour cess. 0% Err:509
BASIC COST per 1 cum Rs Err:509
15 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix M-30 (Cement :
fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost
and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all
materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the
required level curing etc., complete for finished item of work with nomonal reinforcement for Road restoration.
PCC -M-30
Cement-(ENC-PH.Memo.No.146/Cement&Steel / 400.00 Kg 4.60 1 Kg 1840.00
T1
20mm HBG graded metal- ( as per Lead S.No-49) 0.90 Cum 1406.20 1 Cum 1265.58
Sand (C-Mat-Lead statement-S.No.1) 0.45 Cum 1303.00 1 Cum 586.35
Water (including for curing) -M-189-b. irrigation 1.20 Kl #REF! 1 Kl #REF!
SSR
Mason 1st class (labour-Irrigation.S.N.11) 0.10 Nos. 564.00 1 Each 56.40
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 1.39 Nos. 510.00 1 Each 708.90
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity 1.00 hour 397.50 1 hour 397.50
(Hire charges-Irrigation- S.N.16) #REF!
Overheads & Contractors Profit 14% #REF!
#REF!
VAT & Labour cess. 0% #REF!
BASIC COST per 1 cum Rs #REF!
16 BLD-CSTN-3-12-(29) Using Concrete mixture : Plain Cement concrete (M 15) Nominal Mix 1:2.5:5 (Cement : fine
aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and
conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all
materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the
required level curing etc., complete for finished item of work with nomonal reinforcement
447524687.xlsx - data-Road
Unit : 1cum Page 1619 of 2191
A. MATERIALS:
Cement-(ENC-PH.Memo.No.146/Cement&Steel / 330.00 Kg 4.60 1 Kg 1518.00
T1
20mm HBG graded metal- ( as per Lead S.No-49) 0.90 Cum Err:509 1 Cum Err:509
Sand (C-Mat-Lead statement-S.No.1) 0.45 Cum 1303.00 1 Cum 586.35
Water (including for curing) -M-189-b. irrigation 1.20 Kl #REF! 1 Kl #REF!
SSR
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity 1 hour 397.50 1 hour 397.50
B. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11) 0.10 day 564.00 1 day 56.40
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 1.39 day 510.00 1 day 708.90
Sub - Total Rs Err:509
c.Overheads & Contractors Profit 14% Err:509
Grand Total Err:509
VAT & Labour cess. 0% Err:509
Rate per 1 Rmt Err:509
447524687.xlsx - data-Road
18 BLD-CSTN-6-4: Plastering with 12mm thick Page in single coat in CM (1:4) finished smooth including cost and
1620 of 2191
conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all
operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for
finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:4) 0.15 Cum 3325.65 1 Cum 498.85
B. LABOUR:
Mason 1st class (labour-Irri-Skilled .S.N.11) 0.60 Nos 564.00 1 Nos 338.40
Mazdoor (irri-Un skilled-Sn.3) 0.96 Nos 510.00 1 Nos 489.60
Total A+B 1326.85
C.Overheads & Contractors Profit 14% 180.65
Grand Total 1507.50
VAT & Labour cess. 0% 0.00
Rate per 10 Sqm Rs 1507.50
19 BLD-CSTN-8-8-(83) : Plastering with 20mm thick in single coat in CM (1:3) finished smooth including cost and
conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all
operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for
finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:3) 0.21 Cum 3877.65 1 Cum 814.31
B. LABOUR:
Mason 1st class (labour-Irri-Skilled .S.N.11) 0.94 Nos 564.00 1 day 530.16
Mazdoor (irri-Un skilled-Sn.3) 0.16 Nos 510.00 1 day 81.60
Total A+B 1426.07
C.Overheads & Contractors Profit 13.62% 194.16
Sub-Total 1620.23
VAT & labour cess 0% 0.00
Rate per 10 Sqm Rs 1620.23
20 BLD-CSTN-10-25-(148) : Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick
with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials,
seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and labour
charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab
etc,, complete for finished item of work
Unit = 10 sqm
A. MATERIALS:
Cement Mortal 1:3 0.210 Nos 3877.65 1 Nos 814.31
Water proof compound -BMT-H.01- item no.241 2.000 Kg #REF! 1 Kg #REF!
B. LABOUR
Mason 1st class (labour-Irri-Skilled .S.N.11) 0.660 Nos 564.00 1 Nos 372.24
2nd Class Mason (labour-Irri-Semi skilled.S.N.35) 1.540 Nos 540.00 1 Nos 831.60
Mazdoor (Both Men and Women) (irri-Un skilled- 3.70 Nos 510.00 1 Nos 1887.00
Sn.3)
Total Rs #REF!
over heads & contractors profit 14% #REF!
Total cost for 10 sqm #REF!
VAT & labour cess 0% #REF!
Rate per 10 Sqm Rs #REF!
21 BLD-CSTN-9-5: White washing two coats with whiting of approved quality to give an even shade after thoroughly
brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour
charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding
conveyance charges of materials
Whiting / White Cement -BMS-W.68-item-1012 2.00 Kg #REF! 1 Kg #REF!
Gum, conjee water, or prickly pear juice including LS 10.00
necessary fire wood
Brick Layers / Painter ( labour - Irri-Skilled-Sn.11) 0.21 Nos 564.00 1 Nos 118.44
Mazdoor (Both Men and Women) (irri-Un skilled- 0.32 Nos 510.00 1 Nos 163.20
Sn.3) #REF!
447524687.xlsx - data-Road
Sundries including brushes, ladders, etc., 1%
Page 1621 of 2191 #REF!
Rs #REF!
over heads & contractors profit 14% #REF!
Sub-Total #REF!
VAT & labour cess 0% #REF!
Rate per 10 Sqm Rs #REF!
22 BLD-CSTN-12-12-(193): Painting with Synthetic Enamel paints - One Coat - for New Wood Work, Old Wood Work &
New Iron Work including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and
all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).
Synthetic Enamel paint (at 20 sqm / litre as per 0.70 Ltr #REF! 1 Ltr #REF!
British Paints (I) Ltd.- (BMT-J.31-Sn-400)
1st Class Painter (I. Skilled Labour-Irrigation-Sn.35) 0.21 day. 648.00 1 day. 136.08
2nd Class Painter (II. Semi skilled Labour-Irri- 0.49 day. 540.00 1 day. 264.60
Sn.37)
Sundries including brushes, soap, putty etc., 0.00
Total Rs #REF!
over heads & contractors profit 14% #REF!
Total cost for 10 sqm #REF!
VAT & Labour cess. 0% #REF!
Rate per 10 Sqm Rs #REF!
23 BLD-CSTN-4-1-(34) : Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild
steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including
labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks
of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all
wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover
blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including
sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126
Unit = t
(a) Material
HYSD bars including 5 per cent for overlaps and 1.05 Ton Err:509 1 Ton Err:509
wastage
Binding wire- SSR (Irrigation) item No 3, Pg 11 6.00 kg #REF! 1 kg #REF!
B) LABOUR for cutting, bending, shifting to site,
tying, lap splicing and placing in position
Blacksmith/ Bar bender ( Labour-Irrigation-Skilled- 10.00 day 678.00 1 day 6780.00
Sn.1)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 10.00 day 510.00 1 day 5100.00
Sundries on Material
Err:509
(c) Overheads on (a+b)
(d) Contractor’s profit on (a+b+c) 14% Err:509
Rate per t = a+b+c+d 1 MT Err:509
VAT & Labour cess. 0% Err:509
Rate per One MT Sub Total: Err:509
Rate per One Kg Rs. Err:509
A Lowering of DI pipes
Sub Analysis for Lowering
Lowering C.I. Pipes, A class and specials with s/s ends carefully into trench and laying them true to alignment and
* gradient including all sundries but excluding cost and conveyance of pipes from source of supply. (Reference to
specifications. BIS No.3114/94)
Assumtion 10 m
200 mm dia CI pipes 5m long (class ‘A’)
Weight = 2 x 257 kgs = 514 kgs = 5.14 quintal
(a) LABOUR:
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36) 0.102 day 648.00 1 day 66.10
447524687.xlsx - data-Road
Plumber 2nd class ( Labour-Irrigation-S.Skilled-
Page 1622 of0.238
2191 day 540.00 1 day 128.52
Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 1.330 day 510.00 1 day 678.30
(b) Cost for 10 metres 872.92
Rate per metre = b/10 87.29
Rate for 1 kg = b/514 1.698
25 PHE-LCIS-1 : Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with s/s ends carefully into trenches
and laying them true to alignment and gradient including all sundries but excluding cost and conveyance of pipes
from source of supply (Ref to specifications. BIS No.3114/1994)
Note : The Labour charges for cost of Lowering & Laying per 1 kg weight shall be as per sub-analysis made
for 200 mm dia CI Pipes S/s ends.
Details of cost for 5m
a Lowering 80 mm dia DI pipe
Weight of 5m length = (79 +85.5 + 92)/3 = 85.5 kgs
(a) Labour charges for laying 85.500 Kg 1.698 1 Kg 145.18
(b) Overheads & Contractors Profit 14% 19.77
(c) Cost for 5 metres = a+b 164.95
Rate per metre = c/5 32.99
VAT & Labour cess. 0% 0.00
Rate per each cut Rs 32.99
B Jointing of DI pipes
Sub Analysis : (Basic Data) for Jointing of DI Pipes
*
OBSERVED DATA FOR TESTING OF 450 MM DIA PSC MAIN : Pumping main to Hydralic field test pressure
including transportation of Water with minimum lead of 500 M
(Length = 500 Mts) taking out put / 500 Mts. Unit = 1 Rmt.
Labour
Fitters (2 x 3 days)
Fitters I Class ( Labour-Irrigation-Skilled-Sn.6) 3.000 day 648.00 1 day 1944.00
447524687.xlsx - data-Road
Fitters II Class ( Labour-Irrigation-semi Skilled-Sn.9)
Page 1625 of3.000
2191 day 540.00 1 day 1620.00
Machinery
Hire chargers for Hydralic field test pressure testing 3.000 days 1200.00 1 days 3600.00
including transportation of water @ Rs. 1200/-
(1000+200) / day
Materials
Pressure guage 0.050 Nos 500.00 1 Nos25.00
3/4" G.I. Pipe (20 mm) ( excluding labour charges) 3.000 RM #REF! 1 RM#REF!
Specials 1 Ls 500.00 1 Ls
500.00
Dummies 0.100 No. 1500.00 1 Each
150.00
Diesel (2 Lts. / Hr) 30 Hrs.(item No.4 of Pg.22-Irri. SSR) 60.000 Lts. #REF! 1 Lts.
#REF!
(T) Total Rate per 500 Mts. #REF!
(r) Rate per 1 Rmt for 450 mm dia #REF!
(R) Rate per 1 Rmt for 10 mm dia = (10/450) x r #REF!
Note : Proportionate Testing Charges may be arrived, keeping the diametre of pipe based on this analysis,
for an varities of pipes for various Dia Pipes.
26 PHE-JCIR-4 : Jointing C.I., D.I. pipes and fittings with rubber gasket (push-on-joint), excluding the cost of the
gasket but including all sundries filling with water, with a water lead up to 500m and testing to required pressure, etc.
complete Reference to specifications IS 3114/1994/12888/1987
Note : Rubber Gaskets shall be added seperately.
447524687.xlsx - data-Road
(e) Add for water charges @ 1% on LabourPage& 1627 of 2191 #REF!
Testing Charges
(f) Total = d+e+f #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!
447524687.xlsx - data-Road
(e) Add for water charges @ 1% on LabourPage& 1628 of 2191 #REF!
Testing Charges
(f) Total = d+e+f #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!
447524687.xlsx - data-Road
(e) Add for water charges @ 1% on LabourPage& 1629 of 2191 #REF!
Testing Charges
(f) Total = d+e+f #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!
447524687.xlsx - data-Road
(e) Add for water charges @ 1% on LabourPage& 1630 of 2191 #REF!
Testing Charges
(f) Total = d+e+f #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!
447524687.xlsx - data-Road
c) Testing Page 1631 of 2191
Testing of Pipelines with required pressure (as per 50.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e+f #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!
27 PHE-JCIF-5 : Jointing CI pipes, fittings and valves with flanged ends including cost of jointing materials
such as bolts, rubber insertion, white lead including filling with water, with lead up to 500 meters and testing to
required pressure complete. (Reference to specifications. BIS No.3114/1994.)
Details of cost for 10 joints
a 80 mm dia 80 mm dia
a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36) 0.090 day 648.00 1 day 58.32
Plumber 2nd class ( Labour-Irrigation-S.Skilled- 0.210 day 540.00 1 day 113.40
Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 0.800 day 510.00 1 day 408.00
579.72
b) Material
Bolts and nuts 16mm dia 60mm long ( Sn.5-Table- 6.800 kg 123.00 1 kg 836.40
31,Pg.82-2014-15)
Rubber insertion 5mm thick (Sn-4-Table-31,Pg.82- 2.125 kg 103.00 1 kg 218.88
2014-15)
White lead -
c) Testing
Testing of Pipelines with required pressure as per 27.500 rm #REF! 1 rm #REF!
relevant IS Specification including filling with water
with a water lead upto 500 M, including hire
charges of testing equipment, labour and Materials
needed for testing (as per Sub Analysis 2 A)
447524687.xlsx - data-Road
(e) Add for water charges @ 1% on LabourPage & 1632 of 2191 #REF!
Testing Charges
(f) Total = d+e #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each joint Rs #REF!
447524687.xlsx - data-Road
(h) Cost for 10 joints (f+g) Page 1635 of 2191 #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each joint Rs #REF!
447524687.xlsx - data-Road
c) Testing Page 1636 of 2191
Testing of Pipelines (as per Sub Analysis 2 A) 27.50 rm #REF! 1 rm #REF!
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e+f #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each joint Rs #REF!
447524687.xlsx - data-Road
VAT & Labour cess. 0%
Page 1637 of 2191 #REF!
Rate per each joint Rs #REF!
28 BMW-G.01: Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer
approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet &
outlets and over flow pipes but without fittings & base support for tanks
Rate as per BMW-G.01 Sn.335 of 2014-15 -B. SSR 1.00 Lit #REF! 1 Kg #REF!
labour charges-BMW-G.02, S.n.336-B.SSR 20% #REF! #REF!
Total #REF!
Overheads & Contractors Profit 14% #REF!
Total #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Lit Rs #REF!
29 PHE-CCIP-23 : Cutting C.I./ DI Pipes without water in mains where ever required (.Dia of pipes in mm.)
Details of cost for one cutting
a Cutting C.I./ DI Pipe -80 mm dia
(a) Labour
Asst. Fitter / Plumber 2nd class 0.060 day 540.00 1 day 32.40
Man mazdoor 0.060 day 510.00 1 day 30.60
63.00
(b) Overheads & Contractors Profit 14% 8.58
Rate per each m 71.58
VAT & Labour cess. 0% 0.00
Rate per each cut Rs 71.58
447524687.xlsx - data-Road
j Cutting C.I./ DI Pipe - 400 mm dia Page 1639 of 2191
(a) Labour
Asst. Fitter / Plumber 2nd class 0.400 day 540.00 1 day 216.00
Man mazdoor 0.400 day 510.00 1 day 204.00
420.00
(b) Overheads & Contractors Profit 14% 57.18
Rate per each m 477.18
VAT & Labour cess. 0% 0.00
Rate per each cut Rs 477.18
30 Railway crossing/Road crossing/Canal crossing by adopting trenchless technology tunneling work through
specialized pipe jacking method by erecting the equipment to true to the alignment and gradient, by hydraulic pipe
jacking technique complete including tunneling, excavation in all types of soils including hard rock and construction of
RCC chambers suitable to casing pipe pits, and conveyance charges of machinery and other required materials but
excluding cost of encasing pipe, in co-ordination with the concerned authorities as per approved drawings and
directed by the Engineer-in – Charge.
a 800 mm dia
Basic Rate as per table.33 of PH SSR 1 Rmt 26000.00 1 Rmt 26000.00
Cost of 800 mm dia MS pipe-10mm thick 1 Rmt 19113.12 1 Rmt 19113.12
45113.12
Overheads & Contractors Profit 14% 6142.15
51255.27
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt 51255.27
b 900 mm dia
Basic Rate as per table.33 of PH SSR 1 Rmt 27300.00 1 Rmt 27300.00
Cost of 900 mm dia MS pipe-10mm thick 1 Rmt 21355.70 1 Rmt 21355.70
48655.70
Overheads & Contractors Profit 14% 6624.47
55280.17
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt 55280.17
c 1000 mm dia
Basic Rate as per table.33 of PH SSR 1 Rmt 28600.00 1 Rmt 28600.00
Cost of 1000 mm dia MS pipe-10mm thick 1 Rmt 23917.46 1 Rmt 23917.46
52517.46
Overheads & Contractors Profit 14% 7150.25
59667.71
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt 59667.71
d 1100 mm dia
Basic Rate as per table.33 of PH SSR 1 Rmt 29900.00 1 Rmt 29900.00
Cost of 1100 mm dia MS pipe-10mm thick 1 Rmt 27901.65 1 Rmt 27901.65
447524687.xlsx - data-Road
Page 1641 of 2191 57801.65
Overheads & Contractors Profit 14% 7869.69
65671.34
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt 65671.34
e 1200 mm dia
Basic Rate as per table.33 of PH SSR 1 Rmt 31200.00 1 Rmt 31200.00
Cost of 1200 mm dia MS pipe-10mm thick 1 Rmt 31361.23 1 Rmt 31361.23
62561.23
Overheads & Contractors Profit 14% 8517.71
71078.94
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt 71078.94
f 1300 mm dia
Basic Rate as per table.33 of PH SSR 1 Rmt 32500.00 1 Rmt 32500.00
Cost of 1300 mm dia MS pipe-10mm thick 1 Rmt 34182.37 1 Rmt 34182.37
66682.37
Overheads & Contractors Profit 14% 9078.80
75761.17
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt 75761.17
g 1400 mm dia
Basic Rate as per table.33 of PH SSR 1 Rmt 35100.00 1 Rmt 35100.00
Cost of 1400 mm dia MS pipe-10mm thick 1 Rmt 36421.42 1 Rmt 36421.42
71521.42
Overheads & Contractors Profit 14% 9737.64
81259.06
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt 81259.06
g 1500 mm dia
Basic Rate as per table.33 of PH SSR 1 Rmt 39000.00 1 Rmt 39000.00
Cost of 1500 mm dia MS pipe-10mm thick 1 Rmt 38990.24 1 Rmt 38990.24
77990.24
Overheads & Contractors Profit 14% 10618.37
88608.61
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt 88608.61
OBSERVED DATA
31 Providing, Laying & Jointing of the following DI pipes of K7 class as per ISI with spigot and socket ends, with all
necessary fittings as per IS 3114, including cost of DI pipes and specials and rubber rings, lowering, laying, jointing
and testing to required pressure including cost and conveyance of all materials to the site, labour charges etc., etc.
complete. ( Rates are inclusive of CP & OH )
a 100mm dia.DI K7 class (per Rmt)
Basic rate of DI pipe as per separate sheet 1 Rmt 1234.31 1 Rmt 1234.31
Cost of Rubber gasket ( Rate/5.50Rmt) 0.18 No 128.73 1 No 23.43
Lowering Charges as per data-34.b 1 Rmt 41.93 1 Rmt 41.93
Jointing charges ( Rate/5.50 Rmt) 0.18 No #REF! 1 No #REF!
Total #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!
447524687.xlsx - data-Road
VAT & Labour cess. 0%
Page 1642 of 2191 #REF!
Rate per 1 Rmt Rs #REF!
447524687.xlsx - data-Road
32 Observed data based on IRR-CCDW1-8 : Providing and
Page 1643 fixing 1.50 m long 16mm dia cold twisted deformed steel
of 2191
Anchor rods with 0.75m length driven in to the hole drilled in bed rock and remaining length embedded in concrete/
masonry including cost of all materials, machinary, labour, drilling and cleaning hole, driving Anchore rod, grouting
hole with thick cement slurry etc, with intial lead up to 50m and all lifts.
Unit - 10 Nos 16 mm dia
A) MATERIALS
16mm dia Steel (including 5% Wastage) 10 Nos of 23.70 Kg 44.50 1 Kg 1054.65
1.50m length
Drilling of 20mm dia holes by Pneumatic 7.5 Rmt #REF! 1 Rmt #REF!
Compressor Sl No.141 - R & B SSR-2013-14
( 10Nos x 0.75m)
Grouting 20mm dia holes with neat cement slurry 7.5 Rmt #REF! 1 Rmt #REF!
Sl No.144 Pg No. 19 - R & B SSR-2013-14
( 10Nos x 0.75m)
B) LABOUR CHARGES
Bar Bender 0.50 day 678.00 1 day 339.00
Mason 2nd class 0.50 day 540.00 1 day 270.00
Mazdoor (unskilled) 1.00 day 510.00 1 day 510.00
Rate per 10 Nos Rs #REF!
Rate per 1 Nos Rs #REF!
Rate per Each Rs #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 No #REF!
33 Laying of Service lines for facilitating connections to properties including cost and conveyance of all material and all
labour charges etc, complete.
a AC Service Lines - with 100mm dia AC class 15 p Unit 100 m
Rate of AC 100mm dia pipe as per work sheet 100 Rmt #REF! 1 Rmt #REF!
Rate of 100mm dia Coupling for 90% the pipe 23 Nos #REF! 1 Nos #REF!
Length
Rubber ring to suit AC 100mm dia coupling 23 Nos #REF! 1 Nos #REF!
Rate of 100mm dia CID Joints for 10% the pipe 3 No 3.8 Kg #REF! 1 Kg #REF!
Length @ 3.80 Kg/each
Earth work Excavation -100 x 0.5 x1.10 55.00 Cum 132.49 1 Cum 7286.95
Sand / stone dust Bedding : 100 x 0.5 x 0.10 5.00 Cum 732.87 1 Cum 3664.35
Lowering and Jointing Charges 100.00 Rmt 73.70 1 Rmt 7370.00
Rate per 100 Rmt #REF!
Rate per 1 Rmt #REF!
Add for Specials and fittings etc at 2% #REF!
#REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt #REF!
b HDPE Service Line - with 110mm dia -PE.100, 6Kg pipe Unit 100 m
Rate of 110mm OD -HDPE 6 Kg/Sqcm -PE-100 100 Rmt 432.17 1 Rmt 43217.44
pipe as per work sheet
Earth work Excavation -100 x 0.5 x1.10 55.00 Cum 132.49 1 Cum 7286.95
Sand Bedding : 100 x 0.5 x 0.10 5.00 Cum 732.87 1 Cum 3664.35
Lowering and Jointing Charges 100.00 Rmt 68.40 1 Rmt 6840.00
Rate per 100 Rmt 61008.74
Rate per 1 Rmt 610.09
Add for Specials and fittings etc at 2% 12.00
622.09
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt 622.09
Unit = each
447524687.xlsx - data-Road
Taking output = 30 Nos. Page 1644 of 2191 30 Nos
a) labour
Mate day 540.00 1 day 0.00
Mazdoor (Unskilled) 10.480 day 510.00 1 day 5344.80
Electrician / Lineman 2.000 day 648.00 1 day 1296.00
b) Machinery
Tractor with trolley 3t 1.500 hour 464.80 1 hour 697.20
7338.00
c&d) Overheads & Contractors Profit 14% 999.07
Cost for 30 poles = a+b+c+d 8337.07
Rate per pole = (a+b+c+d)/30 277.90
VAT & Labour cess. 0% 0.00
Rate per each 277.90
33 Shifting and errection of electric poles, telephone poles coming across the proposed alignment of the pipeline
including cost and conveyance of all material and all labour charges etc,. Complete.
Removal of telephone/electric poles 1 No 277.90 1 No 277.90
PSCC Pole (8.0 m) - 140 Kg WL (as per electrical 1 No 2585.00 1 No 2585.00
cost data (APSEB) for the year 2013-14 under
centralised material for RE and distribution works
vide Pg.1-5, S.N-14)
CC (1:4:8) for foundation (pi x r2 x h ) = 3.14 x (0.30)2 x 0.750.21 Cum Err:509 1 Cum Err:509
CC (1:2:4) for support above GL (pi x r h ) = 3.14
2x
0.10 Cum Err:509 1 Cum Err:509
x (0.25)2 x 0.50
Err:509
Erection charges of Electrical pole LS 337.2
Rate per each Err:509
34 Shifting of under ground cables coming across the proposed alignment of the pipeline including Earth work
excavation, shifting of cables and backfilling etc, complete.
RBR-FNDN-1- (i-B) - EWE In ordinary soils, by 0.3375 Cum 132.49 1 Cum 44.72
Mechanical means per 1 Rmt - 1 x0.45 x 0.75 =
0.3375 cum
Labour charges for shifting the cable and repairs etc LS 13.42
Rate per 1 Rmt 58.14
35 Manufacturing ,Supplying and errection of air valve gaurd cabins of size 0.90 x0.90 x 0.90 m made with 4 nos vertical
and 8 nos horizontal MS flats of size 50x8 mm and 12mm dia MS round bars fixed at 10 cm c/c with door and
locking arrangements as per approved drawing and as directed by the departmental officers and painting both sides
with anti corrossive paint two coats over one coat of primery coat including cost of all materials , fabrication ,welding ,
transportation to site, all taxes and duties,fixing in position duly embodying in CC(1:4:8) prop , and all other
incidental and operational charges etc complete for finished item of work.
4 RBR-FNDN-1- (I-B-i) - In ordinary soils up to 3.00 Mts depth below GL by Mechanical means: Earthwork
excavation in all kinds of soils as per drawing and technical specifications including setting out, construction of
shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of
sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305
MORD / 304 MORTH. for Sumps,Thrust blocks, Chambers and Man Holes etc. by mechanical means.
5 RBR-FNDN-1- (III) - Hard rock (require blasting) -up to 3.00Mts. below GL: Excavation in Hard rockas per
drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps
and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in
trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH. for
Sumps,Thrust blocks, Chambers and Man Holes etc. by mechanical means. .
Upto 3 m depth including 1.5 m depth in hard rock
up to 3.00 Mts depth below GL out put 10.0 Cum
a) Labour
Mate ( Labour- R&B-S.N.71)
Driller ( Labour - R&B- Sn.31) 0.50 Nos. 660.00 1 Each 330.00
Blaster ( Labour-Irrigation-Skilled-Sn.3) 0.25 Nos. 678.00 1 Each 169.50
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 8.35 Nos. 510.00 1 Each 4258.50
b) Machinery
Air compressor 210 cfm / 250 cfm with 2 jack hammers 1.00 hours 1358.70 1 hours 1358.70
for drilling at 15 cum per hour (Hire-Irri-Sn.3)
c) Materials
Gelatin 80%, (Pg 30 of Irrigation items - M - 104 ) 3.50 No #REF! 1 No #REF!
447524687.xlsx - data-Road
Detonator electric, (Pg 29 of Irrigation SoR - MPage
- 1646 of14.00
2191 Nos #REF! 100 Nos #REF!
094) Sub total #REF!
c&d) Overheads & Contractors Profit 14% #REF!
Cost for 240 cum = a+b+c+d #REF!
Rate per cum = (a+b+c+d)/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Cum excluding Dewatering Rs #REF!
6 RBR-EECD-9 -ii-B : :Excavation in hard rock (blasting prohibited) with rock breakers including breaking rock, loading
in tippers and disposal with initial lift of 3 mts and lead upto 1000 metres, trimming bottom and side slopes in
accordance with requirements of lines, grades and cross- sections as per Technical Specification Clause 302.3.5
MORD / 301 MORTH , by Machanical means for Sumps, Thrust Blocks and Man Holes etc,.
7 BLD-CSTN-2-8 (16) : Collection ,Supply and filling of Sand from approved quarry to work site and stacking at work
site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour charges etc.
complete as per standard specifications. Clause 305.3.9 MORD & 304 MORTH
Sand Filling out put 6.00 Cum
a) Material
Sand (C-Mat-Lead statement-S.No.1) 6.00 Cum 1303.00 1 Cum 7818.00
b) Labour
Mate ( Labour- R&B-S.N.71) 0.00 Nos 540.00 1 Nos 0.00
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 0.31 Nos 510.00 1 Nos 158.10
Sub Total 7976.10
b&c) Overheads & Contractors Profit 14% 1085.95
Cost for 6 cum = a+b+c 9062.05
Rate per cum = (a+b+c)/6 1510.34
VAT & Labour cess. 0% 0.00
Rate per 1 Cum 1510.34
8 BLD-CSTN-3-7-Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:5:10)
prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including
cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on
all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the
required level curing etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:
Cement (ENC-PH.Memo.No.146/Cement & Steel / 129.60 Kg 4.600 1 Kg 596.16
T1
Coarse aggregate 40mm graded ( C-Mat- S.No-57) 0.90 Cum Err:509 1 Cum Err:509
Fine aggregate (Sand) ( C-Mat-S.N.2 ) 0.45 Cum 1303.00 1 Cum 586.35
Water (including for curing) -M-189-b. irrigation 1.20 Kl 98.00 1 Kl 117.60
SSR
B. MACHINERY
447524687.xlsx - data-Road
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity
Page 1647 of 21911 hour 397.50 1 hour 397.50
(Hire charges-Irrigation-
C. LABOUR: S.N.16)
Mason 1st class (labour-Irrigation.S.N.11) 0.10 Nos 564.00 1 Nos 56.40
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 1.39 Nos 510.00 1 Nos 708.90
Sub- Total Rs Err:509
d) Overheads & Contractors Profit 14% Err:509
Rate per cu.m. Rs Err:509
VAT & labour cess 0% Err:509
Rate per 1 Cum Err:509
9 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix
(1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage
charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top
surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:
Cement-(ENC-PH.Memo.No.146/Cement&Steel / 162.00 Kg 4.60 1 Kg 745.20
T1
Coarse aggregate 40mm graded ( C-Mat- S.No-57) 0.90 Cum 799.95 1 Cum 719.96
Fine aggregate (Sand) ( C-Mat-S.N.2 ) 0.45 Cum 1303.00 1 Cum 586.35
Water (including for curing) -M-189-b. irrigation 1.20 Kl 98.00 1 Kl 117.60
SSR
B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity 1 hour 397.50 1 hour 397.50
(Hire charges-Irrigation- S.N.16)
C. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11) 0.10 Nos 564.00 1 Nos 56.40
Man mazdoor 1.39 Nos 510.00 1 Nos 708.90
Grand Total Rs 3331.91
Overheads & Contractors Profit 14% 453.64
Rate per cu.m. Rs 3785.55
VAT & Labour cess. 0% 0.00
Rate per 1 Cum Rs 3785.55
10 BLD-CSTN-3-10- ( 27 ) Hand mixing : Plain Cement concrete nominal mix (1:3:6) prop (Cement : fine aggregate:
coarse aggregate ) using 20mm size Hard Granite Machine Crushed Metal including cost and conveyance of all
materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing
etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:
Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1 220.00 Kg 4.60 1 Kg 1012.00
Coarse aggregate 20mm graded (C-Mat-Sn.48) 0.90 Cum Err:509 1 Cum Err:509
Fine aggregate (Sand) 0.45 Cum 1303.00 1 Cum 586.35
Water (including for curing) 1.20 Kl 98.00 1 Kl 117.60
B. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11) 0.10 day 564.00 1 day 56.40
Man mazdoor 2.36 day 510.00 1 day 1203.60
Sub - Total Rs Err:509
c.Overheads & Contractors Profit 14% Err:509
Rate per cu.m. Rs Err:509
VAT & Labour cess. 0% Err:509
Rate per 1 Cum Rs Err:509
447524687.xlsx - data-Road
3 BLD-CSTN-3-14-(31)-A: Supply and placing of Page the1648
M-30 Design Mix Concrete corresponding to IS 456 using
of 2191
WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from
approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement
content as per IS code . for FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth)
4 BLD-CSTN-3-14-(31)-B: Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using
WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from
approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement
content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS
Vibrator hire charges ( Hire charges-irrigation. 1.333 hour 205.00 1 hour 273.27
Sn.41)
Water (including for curing) -M-189-b. irrigation 1.20 Kl 98.00 1 Kl 117.60
SSR
BASIC COST per 1 cum Rs 7728.00
Columns up to 3.66 Mts unsupported height above GL
RCC - M-30 Grade of Mix 1.00 Cum 7728.00 1 Cum 7728.00
Material charges for Centering & Scaffolding, Pg 1.00 Cum 355.00 1 Cum 355.00
No.84 to 89 (Steel scaffolding)
Labour charges for Centering & Scaffolding,Pg 1.00 Cum 2268.00 1 Cum 2268.00
No.84 to 89
Add Labour component @ 20% 453.60
Basic Cost Rs 10804.60
Overheads & Contractors Profit 13.615% 1471.05
447524687.xlsx - data-Road
Page 1649 of 2191 12275.65
VAT & labour cess 0% 0.00
Rate per One Cum Rs 12275.65
Rs 11267.79
Overheads & Contractors Profit 13.615% 1534.11
Total 12801.90
VAT & labour cess 0% 0.00
Rate per One Cum Rs 12801.90
Rs 13043.00
Overheads & Contractors Profit 13.615% 1775.8
Total 14818.80
VAT & labour cess 0% 0.00
Rate per One Cum Rs 14818.80
Rs 15245.12
Overheads & Contractors Profit 13.615% 2075.62
Total 17320.74
VAT & labour cess 0% 0.00
Rate per One Cum Rs 17320.74
447524687.xlsx - data-Road
Page 1650 of 2191 Rs 13730.88
Overheads & Contractors Profit 13.615% 1869.46
Total 15600.34
VAT & labour cess 0% 0.00
Rate per One Cum Rs 15600.34
Rs 13136.00
Overheads & Contractors Profit 13.615% 1788.47
Total 14924.47
VAT & labour cess 0% 0.00
Rate per One Cum Rs 14924.47
5 BLD-CSTN-3-14-(31)-C : Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using
WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from
approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement
content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering,
laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item
of work. for RCC SLABS, BEAMS
i RCC Slabs
A RCC M 30 Slabs up to 3.66 Mts height
RCC M 30 Slabs up to 3.66m Height &
a 100 mm
Thickness of
Cost of M- 30 grade mix 1.00 Cum 5533.07 1 Cum 5533.07
Centering charges ,Pg No.84 to 89 10.00 Sqm 236.00 1 Sqm 2360.00
Labour charges,Pg No.84 to 89 10.00 Sqm 215.00 1 Sqm 2150.00
Add Labour component @ 20% 430.00
Rs 10473.07
Overheads & Contractors Profit 13.615% 1425.91
Total 11898.98
VAT & labour cess 0% 0.00
Rate per One Cum Rs 11898.98
6 Suply, delivery and fixing of C.I. heavy weight manhole frame and cover in the roof slab incuding labour charges for
fixing and all incidental and operational charges as directed by the Engineer in Charge..
Weight of C.I. heavy weight manhole frame and 1 Kg 103.820 1 Kg 103.82
cover 90 Kg each( 2 x 90 ) = 180 Kg- rate as per CI
specials vide This data book
Total Rs 103.82
Overheads & Contractors Profit 14% 14.14
Total 117.96
447524687.xlsx - data-Road
VAT & labour cess 0%
Page 1652 of 2191 0.00
Cost of Man hole frame in Kg Rs 117.96
7 Manufacturing, supply and erection of 600 mm width ladders with 50X50X6 mm MS angles 2 nos verticals and
horizontals fixed at 25 cm c/c as per aprooved drawing and as directed by the departmental officers and painting
both sides with anti corrosive paint two coats over one coat of primary coat including cost of all materials fabrication,
welding transportation to site, all taxex and duties, fixing in position duly embodying in CC (1:1.5:3) prop., and all
other incidental and operational charges etc., complete for finished item of work.
Cost of ladder of 4.0 m
Weight of 50x50x6mm MS channels =(14.50 Rmt x 61.05 kg
4.42 kg/Rmt =
total 61.05 kg
6" dia (152.4mm) Double Socket - TBSP-C.I-02 1 Rmt 998.00 1 Rmt 998.00
Pg,... of the 2015-16- B.SSR -
Earth work excavation (1.00x0.45x0.45 =0.2025 0.2025 Cum 185.64 1 Cum 37.59
Cum
Rate )per 15.00 Rmt 1035.59
Rate per 1 Rmt 1035.59
Overheads & Contractors Profit 141.00
1176.59
VAT & labour cess 0% 0.00
Rate per 1 Rmt 1176.59
7 Supply, delivery and fixing of 110mm dia PVC vent pipe including vent cowl, cost of material and labour charges etc.,
complete for fixing it to the septic tank for 15m height above GL
Cost of 110mm dia PVC Pipe.of 3.00 Mts length 1 No 484.00 3 Rmt 161.33
B.SSR 2015-16-sani. Item No. TBSP-H.I-03
Rate for 15 Rmt PVC pipe 15 Rmt 161.33 1 Rmt 2419.95
Rate for vent cowl SSR item: TBSP-H.II-55 1 No 19.00 1 Each 19.00
PVC Pipe clip SSR item - TBSP-H.II-61 10 No 18.00 1 Each 180.00
Labour charges for laying, fixing and 15 Rmt 70.00 1 Rmt 1050.00
commissioning the PVC pipes including couplers/
bends/ tees etc any diameter including fixing
necessary fittings like bends, plugs, couplers,
junctions, tees, etc with solvent jointing as per
standard practice, as per item No. TBSP-H.IV-01
C. LABOUR:
Mason 1st class (labour-Irri-Skilled .S.N.11) 0.10 Nos 564.00 1 Nos 56.40
Mazdoor (irri-Un skilled-Sn.3) 1.39 Nos 510.00 1 Nos 708.90
Total Rs 4391.58
Overheads & Contractors Profit 13.615% 597.91
Total 4989.49
VAT & labour cess 0% 0.00
Rate per cu.m. Rs 4989.49
a CC (1:2:4) for 1.50m dia, 50mm thick ring of
0.30m height
Qty of Ring = 2 x pi x r x t x h
Basic Rate per Cum. 0.072 Cum 4989.49 1 Cum 359.24
Centering Charges for Bed Blocks and Bands 0.072 Cum 64.00 1 Cum 4.61
Labour charges for Bed blocks-Pg-84 to 89 0.072 Cum 325.00 1 Cum 23.40
Add Labour component @ 20% 4.68
add steel @ 40 Kg/ Cum (6mm rods) 2.88 Kg 46.00 1 Kg 132.48
Total Rs 524.41
VAT & labour cess 0% 0.00
Rate per each ring Rs 524.41
9 BLD-CSTN-3-11-(28)-Using Concrete mixture up to Plinth Level ; Plain Cement concrete nominal mix M-20 prop
(Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage
charges on all materials, labour charges , for mixing , laying, concrete , ramming in layers, finishing to required
level, curing etc., complete for finished item of work with nomonal reinforcement
Unit : 1cum
A. MATERIALS:
Cement-(ENC-PH.Memo.No.146/Cement&Steel / 330.00 Kg 4.60 1 Kg 1518.00
T1
20mm Graded Metal (C-Mat- Sn.49) 0.90 Cum 1406.20 1 Cum 1265.58
Sand (C-Mat-Lead statement-S.No.1) 0.45 Cum 1303.00 1 Cum 586.35
Water (including for curing) -M-189-b. irrigation 1.20 Kl 98.00 1 Kl 117.60
SSR
B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity 1 hour 397.50 1 hour 397.50
447524687.xlsx - data-Road
C. LABOUR: Page 1654 of 2191
Mason 1st class (labour-Irri-Skilled .S.N.11) 0.10 Nos 564.00 1 Nos 56.40
Mazdoor (irri-Un skilled-Sn.3) 1.39 Nos 510.00 1 Nos 708.90
Total Rs 4650.33
Overheads & Contractors Profit 13.615% 633.14
Total 5283.47
VAT & labour cess 0% 0.00
Rate per cu.m. Rs 5283.47
10 Supply and delivery of 6mm thick rubber packing confirming to IS including cost and conveyance, packing,
farwarding, transit risk etc.complete including all taxes and duties but excluding VAT.
Cost as per SSR- PH Items-Pg … Table.No.31- 1 Kg 103.00 1 Kg 103.00
Sn.4
over heads & contractors profit 14.42
VAT & labour cess 0% 0.00
Rate per 1 Kg Rs 117.42
11 Supply and delivery of MS Bolts and Nuts with double washers confirming to IS specification including cost and
conveyance, packing, farwarding, transit risk etc.complete including all taxes and duties but excluding VAT..
Cost as per SSR- PH Items-Pg … 1 Kg 123.00 1 Kg 85.00
Table.No.31.Sn.5
over heads & contractors profit 11.90
VAT & labour cess 0% 0.00
Rate per 1 Kg Rs 96.90
447524687.xlsx - data-Road
12 BLD-CSTN-4-1-(34) : Providing High Yield Strength Deformed
Page 1655 of 2191 (HYSD)/ Thermo Mechanically Treated (TMT) / Mild
steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including
labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks
of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all
wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover
blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including
sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126
Unit = t
(a) Material
HYSD bars including 5 per cent for overlaps and 1.05 Ton Err:509 1 Ton Err:509
wastage
Binding wire- SSR (Irrigation) item No 3, Pg 11 6.00 kg #REF! 1 kg #REF!
B) LABOUR for cutting, bending, shifting to site,
tying, lap splicing and placing in position
Blacksmith/ Bar bender ( Labour-Irrigation-Skilled- 10.00 day 678.00 1 day 6780.00
Sn.1)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 10.00 day 510.00 1 day 5100.00
Sundries on Material
Err:509
(c) Overheads on (a+b)
(d) Contractor’s profit on (a+b+c) 14% Err:509
Rate per t = a+b+c+d 1 MT Err:509
VAT & Labour cess. 0% Err:509
Rate per One MT Sub Total: Err:509
Rate per One Kg Rs. Err:509
13 BLD-CSTN-8-1-(76) : Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and
conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all
operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for
finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:3) 0.15 Cum 3877.65 1 Cum 581.65
B. LABOUR:
Mason 1st class (labour-Irri-Skilled .S.N.11) 0.60 Nos 564.00 1 Nos 338.40
Mazdoor (irri-Un skilled-Sn.3) 0.96 Nos 510.00 1 Nos 489.60
Total A+B 1409.65
C.Overheads & Contractors Profit 14% 191.92
Sub-Total 1601.57
VAT & labour cess 0% 0.00
Rate per 10 Sqm Rs 1601.57
14 BLD-CSTN-9-5: White washing two coats with whiting of approved quality to give an even shade after thoroughly
brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour
charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding
conveyance charges of materials
Whiting / White Cement -BMS-W.68-item- 2.00 Kg #REF! 1 Kg #REF!
Gum, conjee water, or prickly pear juice including LS 10.00
necessary fire wood
Brick Layers / Painter ( labour - Irri-Skilled-Sn.11) 0.21 Nos 564.00 1 Nos 118.44
Mazdoor (irri-Un skilled-Sn.3) 0.32 Nos 510.00 1 Nos 163.20
#REF!
Sundries including brushes, ladders, etc., 1% #REF!
Rs #REF!
over heads & contractors profit 14% #REF!
Sub-Total #REF!
VAT & labour cess 0% #REF!
Rate per 10 Sqm Rs #REF!
447524687.xlsx - data-Road
15 BLD-CSTN-12-12-(193): Painting with Synthetic Enamel paints
Page 1656 of 2191 - One Coat - for New Wood Work, Old Wood Work &
New Iron Work including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and
all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).
Synthetic Enamel paint (at 20 sqm / litre as per 0.70 Ltr #REF! 1 Ltr #REF!
British Paints (I) Ltd.- (BMT-J.31-Sn-400)
1st Class Painter (I. Skilled Labour-Irrigation-Sn.35) 0.21 day. 648.00 1 day. 136.08
2nd Class Painter (II. Semi skilled Labour-Irri- 0.49 day. 540.00 1 day. 264.60
Sn.37)
Sundries including brushes, soap, putty etc., 0.00
Total Rs #REF!
over heads & contractors profit 14% #REF!
Total cost for 10 sqm #REF!
VAT & Labour cess. 0% #REF!
Rate per 10 Sqm Rs #REF!
16 BLD-CSTN-2-9 (17); Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations
and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering
and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire
charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
17 Carting of surplus excavated rock from the site to a distance suitable including loading, unloading charges, cost &
conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete.
a Rock/CC
Page No.328 of SSR, Conveyance rates - 5.00 Km 1 cum 57.10 1 Cum 57.10
VAT & Labour cess. 0% 0.00
Rate per 1 Cum Rs 57.10
b Earth
Page No.124 of SSR, Conveyance rates - 5.00 Km 1 cum 57.10 1 Cum 57.10
VAT & Labour cess. 0% 0.00
Rate per 1 Cum Rs 57.10
18 BLD-CSTN-9-5-(103): Flooring with Glass Mosaic Tiles Group 1 series or equivalent quality 20x20x4 mm
thick , set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including
neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to
full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc.,
complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of
conveyance of all materials.
Unit = 10 sqm
A. MATERIALS:
Supply of glazed full body glass mosaic tiles of 20 x 10.50 sqm 0.00 1 sqm 0.00
20 x 4 mm thick in specified pattern 1st Quality of
any colour and design TBSC-C.VI-01
Cement for CM (1:8) for base coat 21.60 kg. 4.60 1 kg. 99.36
Cement for slurry 33.00 kg. 4.60 1 kg. 151.80
Cement for Pointing with CM (1:3) 6.000 kg. 4.60 1 kg. 27.60
Sand for CM (1:8) 0.12 cum 1493.00 1 cum 179.16
Sand for pointing 0.020 cum 1493.00 1 cum 29.86
B. LABOUR
Mason 1st class (labour-Irri-Skilled .S.N.11) 0.96 day 564.00 1 day 541.44
447524687.xlsx - data-Road
2nd Class Mason (labour-Irri-Semi skilled.S.N.35) 2.24
Page 1657 of 2191 day 540.00 1 day 1209.60
Mazdoor (Both Men and Women) (irri-Un skilled- 3.30 day 510.00 1 day 1683.00
Sn.3) 3921.82
Add water charges 1% 1% 39.22
for fixing labour charges 0.00 1 sqm 0.00
Grand Total 3961.04
over heads & contractors profit 14% 539.3
Total cost for 10 sqm 4500.34
VAT & labour cess 0% 0.00
Rate per 10 Sqm Rs 4500.34
b 1.00 Mts to 2.00 Mts depth below GL out put 10.00 Cum
Basic Rate as per PH SSR item No. 30 10 Cum #REF! 10 Cum #REF!
Overheads & Contractors Profit #REF!
Cost for 10 cum #REF!
Rate per cum =/10 #REF!
VAT & labour cess etc,. 0% #REF!
Rate per 1 Cum Rs #REF!
c 2.00 Mts to 5.00 Mts depth below GL out put 10.00 Cum
Basic Rate as per PH SSR item No. 30 10 Cum #REF! 10 Cum #REF!
Overheads & Contractors Profit #REF!
Cost for 10 cum #REF!
Rate per cum =/10 #REF!
VAT & labour cess etc,. 0% #REF!
Rate per 1 Cum Rs #REF!
447524687.xlsx - data-Road
f Beyond 5 m deep under water for every Depth
Page 1658 of 2191 8.00 m
additional 1 m depth over item 'c'
7.00 Mts to 8.00m 1 Cum #REF! 1 Cum #REF!
for extra depth beyond 5.00 Mts 3.00 Mts #REF! 1 Mts #REF!
#REF!
Overheads & Contractors Profit #REF!
Cost for 10 cum #REF!
Rate per cum =/10 #REF!
VAT & labour cess etc,. 0% #REF!
Rate per 1 Cum Rs #REF!
2 Laying and jointing perforated RCC pipes inclusive of bailing out water and jointing with cement fillets and all other
incidental charges for infiltration gallery inclusive of bailing out water by pumping to keep the trench reasonably dry to
facilitate the work excluding cost of perforated pipes and collars.
a Dia of the pipe in mm 300 mm
Rate as per the PH SSR item No. 30 for every 25 mm #REF! 1 Rmt #REF!
Overheads & Contractors Profit #REF!
Total #REF!
VAT & labour cess etc,. 0% #REF!
Rate per 1 Rmt Rs #REF!
3 Lowering the RCC plain ended pipes carefully into the trench laying them true to alignment and gradient, jointing
RCC pipes with cement joints including curing, the cost of jointing materials i.e., Cement Mortar (1:1.5), hemp yarn
etc., and testing including filling with water with a water lead upto 500 metres excluding cost of rubber rings as per
BIS No.783/85.
a Dia of the pipe in mm 300 mm
Rate as per the PH SSR item No. 30 for every 25 mm #REF! 1 Rmt #REF!
447524687.xlsx - data-Road
Overheads & Contractors Profit Page 1659 of 2191 #REF!
Total #REF!
VAT & labour cess etc,. 0% #REF!
Rate per 1 Rmt Rs #REF!
4 RBR-FNDN-2; Collection ,Supply and filling of 40 mm metal from approved quarry to work site and stacking at work
site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour charges etc.
complete as per standard specifications.
40 mm Metal Filling out put 6.00 Cum
a) Material
40mm size HG metal ( C-Mat - Sn. 57) 6.00 Cum Err:509 1 Cum Err:509
b) Labour
Mate ( Labour- R&B-S.N.71) 0.00 Nos 540.00 1 Nos 0.00
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 0.31 Nos 510.00 1 Nos 158.10
Sub Total Err:509
b&c) Overheads & Contractors Profit 14% Err:509
Cost for 6 cum = a+b+c Err:509
Rate per cum = (a+b+c)/6 Err:509
VAT & labour cess etc,. 0% Err:509
Rate per 1 Cum Err:509
5 RBR-FNDN-2 ; Collection ,Supply and filling of 20 to 12mm metal from approved quarry to work site and stacking at
work site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour
charges etc. complete as per standard specifications.
20 to 12mm Metal Filling out put 6.00 Cum
a) Material
20 to 12mm size HG metal ( C-Mat- Sn. 47 ) 6.00 Cum Err:509 1 Cum Err:509
b) Labour
Mate ( Labour- R&B-S.N.71) 0.00 Nos 540.00 1 Nos 0.00
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 0.31 Nos 510.00 1 Nos 158.10
Sub Total Err:509
b&c) Overheads & Contractors Profit 14% Err:509
Cost for 6 cum = a+b+c Err:509
Rate per cum = (a+b+c)/6 Err:509
VAT & labour cess etc,. 0% Err:509
Rate per 1 Cum Err:509
6 RBR-FNDN-2: Collection ,Supply and filling of 12 to 6 mm metal from approved quarry to work site and stacking at
work site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour
charges etc. complete as per standard specifications.
12 to 6 mm Metal Filling out put 6.00 Cum
a) Material
12 to 6mm size HG metal ( C- Mat - Sn . 42 ) 6.00 Cum 463.70 1 Cum 2782.20
b) Labour
Mate ( Labour- R&B-S.N.71) 0.00 Nos 540.00 1 Nos 0.00
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 0.31 Nos 510.00 1 Nos 158.10
Sub Total 2940.30
b&c) Overheads & Contractors Profit 14% 400.32
447524687.xlsx - data-Road
Cost for 6 cum = a+b+c Page 1660 of 2191 3498.72
Rate per cum = (a+b+c)/6 583.12
VAT & labour cess etc,. 0% 0.00
Rate per 1 Cum 583.12
7 RBR-FNDN-2: Collection ,Supply and filling of Coarsed sand from approved quarry to work site and stacking at
work site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour
charges etc. complete as per standard specifications.
Coarsed sand Filling out put 6.00 Cum
a) Material
Coarsed sand ( C- Mat - Sn. 1) 6.00 Cum 1303.00 1 Cum 7818.00
b) Labour
Mate ( Labour- R&B-S.N.71) 0.00 Nos 540.00 1 Nos 0.00
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 0.31 Nos 510.00 1 Nos 158.10
Sub Total 7976.10
b&c) Overheads & Contractors Profit 14% 1085.95
Cost for 6 cum = a+b+c 9220.15
Rate per cum = (a+b+c)/6 1536.69
VAT & labour cess etc,. 0% 0.00
Rate per 1 Cum 1536.69
8 RBR-FNDN-2 : Collection ,Supply and filling of Fine sand from approved quarry to work site and stacking at work
site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour charges etc.
complete as per standard specifications.
Fine sand Filling out put 6.00 Cum
a) Material
Fine sand ( C- Mat - Sn. 2) 6.00 Cum 1303.00 1 Cum 7818.00
b) Labour
Mate ( Labour- R&B-S.N.71) 0.00 Nos 540.00 1 Nos 0.00
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 0.31 Nos 510.00 1 Nos 158.10
Sub Total 7976.10
b&c) Overheads & Contractors Profit 14% 1085.95
Cost for 6 cum = a+b+c 9220.15
Rate per cum = (a+b+c)/6 1536.69
VAT & labour cess etc,. 0% 0.00
Rate per 1 Cum 1536.69
9 RBR-FNDN-2 : Collection ,Supply and filling of Filter media from approved quarry to work site and stacking at work
site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour charges etc.
complete as per standard specifications.
Filter media Filling out put 6.00 Cum
a) Material
Filter media ( C- Mat - Sn. 14) 6.00 Cum 774.95 1 Cum 4649.70
b) Labour
Mate ( Labour- R&B-S.N.71) 0.00 Nos 540.00 1 Nos 0.00
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 0.31 Nos 510.00 1 Nos 158.10
Sub Total 4807.80
b&c) Overheads & Contractors Profit 14% 654.58
Cost for 6 cum = a+b+c 5620.48
Rate per cum = (a+b+c)/6 936.75
VAT & labour cess etc,. 0% 0.00
Rate per 1 Cum 936.75
Ordinary Soils : for Sumps, intake wells, Thrust Blocks and Man Holes etc,.
By Manual means
up to 3.00 Mts depth below GL out put 10.00 Cum
a) Labour
447524687.xlsx - data-Road
Mate ( Labour- R&B-S.N.71) Page 1661 of 21910 Nos. 540.00 1 Each 0.00
Mazdoor (Unskilled) ( Labour-Irrigation-Unskilled- 3.64 Nos. 510.00 1 Each 1856.40
S.N.3)
Sub total 1856.40
c&d) Overheads & Contractors Profit 13.615% 252.75
Cost for 240 cum = a+b+c+d 2109.15
Rate per cum = (a+b+c+d)/10 210.92
VAT & labour cess 0% 0.00
- 0% 0.00
Rate per 1 Cum excluding Dewatering Rs 210.92
11 RBR-FNDN-1-(i-B-i) : Earthwork in excavation for structures as per drawing and technical specifications Clause
305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material
and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable
material as per Technical Specification 305 MORD / 304 MORTH - in Ordinary soil - by Machanical means
12 RBR-FNDN-1-(i-B-ii) : Earthwork in excavation for structures as per drawing and technical specifications Clause
305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material
and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable
material as per Technical Specification 305 MORD / 304 MORTH - in Ordinary soil
13 RBR-FNDN-1-(i-B-iii) : Earthwork in excavation for structures as per drawing and technical specifications Clause
305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material
and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable
material as per Technical Specification 305 MORD / 304 MORTH - in Ordinary soil
14 RBR-FNDN-1 - B -III - Earthwork in excavation for structures as per drawing and technical specifications Clause
305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material
and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable
material as per Technical Specification 305 MORD / 304 MORTH - Ordinary Soils : for Sumps, Thrust Blocks and
Man Holes etc,.Hard rock (requiring blasting) - Upto 3 m depth
11 RBR-EECD-9 -ii-B : :Excavation in hard rock (blasting prohibited) with rock breakers including breaking rock, loading
in tippers and disposal with initial lift of 3 mts and lead upto 1000 metres, trimming bottom and side slopes in
accordance with requirements of lines, grades and cross- sections as per Technical Specification Clause 302.3.5
MORD / 301 MORTH , by Machanical means for Sumps, Thrust Blocks and Man Holes etc,.
out put 36.00 Cum
a) Labour
Mate ( Labour- R&B-S.N.71) 0.000 day 540.00 1 day 0.00
Mazdoor (Unskilled) ( Labour-Irrigation-Unskilled- 10.400 day 510.00 1 day 5304.00
S.N.3)
b) Machinery
Hydraulic excavator 0.9 cum with rock breaker 6.000 hour 2967.90 1 hour 17807.40
attachment @ 6 cum per hour
Tipper 5.5 cum-1 trip per hour ( R&B-Hire-Sn.6) 6.50 hour 924.10 1 hour 6006.65
Credit for excavated rock found suitable for use @ -18.00 cum 65.00 1 cum -1170.00
50 per cent of excavated quantity -M-089-Pg.29 -
Irri SSR
Total 27948.05
d) Overheads & Contractors Profit 13.615% 3805.13
31753.18
Rate per cum = a+b+c+d+e)/36 882.03
Add extra for Dewatering @ 5% 5% 44.10
Rate per 1 Cum excluding Dewatering 926.13
447524687.xlsx - data-Road
12 RBR-FNDN-1- (IV) - Hard rock (blasting prohibited)
Page 1663 of-up
2191to 3.00Mts. below GL: Excavation in Hard Rock in
habitant areas where conventional blasting can not be done as per drawings and technical specifications including
setting out, construction of shoring and bracing, dressing of sides and bottom as per Technical Specification 305
MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services
wherever it is possible during the execution and taking all precautionary measures in the restricted areas etc,
complete.
out put 10.00 Cum
a) Labour
Mate ( Labour- R&B-S.N.71) 0.00 Nos 540.00 1 Nos 0.00
Mazdoor (Unskilled) ( Labour-Irrigation-Unskilled- 5.20 Nos 510.00 1 Nos 2652.00
S.N.3)
b) Machinery
Air compressor 210 cfm / 250 cfm with 2 jack 6.00 hour 1358.70 1 hour 8152.20
hammers ( Hire charges- Irrigation-S.N.3)
sub total ; a+b 10804.20
c&d) Overheads & Contractors Profit 14% 1470.99
Cost for 10 cum = a+b+c+d 12275.19
Rate per cum = a+b+c+d+e)/10 1227.52
VAT & Labour cess. 0% 0.00
a Rate per 1 Cum excluding Dewatering 1227.52
Add extra for Dewatering @ 5% 5% 61.38
b Rate per 1 Cum including Dewatering Rs 1288.90
14 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix
(1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage
charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top
surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:
Cement (ENC-PH.Memo.146/Cement&Steel / T1 / 162.00 Kg 4.600 1 Kg 745.20
Coarse aggregate 40mm graded ( as per Lead 0.90 Cum 1256.20 1 Cum 1130.58
statement. Sn.35)
Fine aggregate (Sand) ( Lead statement-S.N.2 ) 0.45 Cum 1303.00 1 Cum 586.35
Water (including for curing) -M-189- SSR- irrigation 1.20 Kl 98.00 1 Kl 117.60
items 2579.73
B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity 1 hour 397.50 1 hour 397.50
(Hire charges-Irrigation- S.N.16)
397.50
C. LABOUR:
Mason 1st class(labour-Irrigation.S.N.11) 0.10 Nos 564.00 1 Nos 56.40
Mazdoor (irri-Un skilled-Sn.3) 1.39 Nos 510.00 1 Nos 708.90
765.30
Total Rs 3742.53
c&d) Overheads & Contractors Profit 14% 509.55
Rate per cu.m. Rs 4252.08
VAT & labour cess etc,. 0% 0.00
Rate per 1 Cum up to 3.00m initial depth below GL Rs 4252.08
447524687.xlsx - data-Road
Basic
Page 1664 of 2191 No. of Delift OH& CP VAT & Total
B Depth of CC (1:5:10) from Ground Level Cost Delifts charges @ LC
#REF! 14% 0%
a Rate per 3 to 4.00 m depth from GL 3742.53 1.00 #REF! #REF! #REF! #REF!
b Rate per 4 to 5.00 m depth from GL 3742.53 2.00 #REF! #REF! #REF! #REF!
c Rate per 5 to 6.00 m depth from GL 3742.53 3.00 #REF! #REF! #REF! #REF!
d Rate per 6 to 7.00 m depth from GL 3742.53 4.00 #REF! #REF! #REF! #REF!
e Rate per 7 to 8.00 m depth from GL 3742.53 5.00 #REF! #REF! #REF! #REF!
f Rate per 8 to 9.00 m depth from GL 3742.53 6.00 #REF! #REF! #REF! #REF!
g Rate per 9 to 10.00 m depth from GL 3742.53 7.00 #REF! #REF! #REF! #REF!
h Rate per 10 to 11.00 m depth from GL 3742.53 8.00 #REF! #REF! #REF! #REF!
i Rate per 11 to 12.00 m depth from GL 3742.53 9.00 #REF! #REF! #REF! #REF!
j Rate per 12 to 13.00 m depth from GL 3742.53 10.00 #REF! #REF! #REF! #REF!
k Rate per 13 to 14.00 m depth from GL 3742.53 11.00 #REF! #REF! #REF! #REF!
l Rate per 14 to 15.00 m depth from GL 3742.53 12.00 #REF! #REF! #REF! #REF!
m Rate per 15 to 16.00 m depth from GL 3742.53 13.00 #REF! #REF! #REF! #REF!
n Rate per 16 to 17.00 m depth from GL 3742.53 14.00 #REF! #REF! #REF! #REF!
o Rate per 17 to 18.00 m depth from GL 3742.53 15.00 #REF! #REF! #REF! #REF!
p Rate per 18 to 19.00 m depth from GL 3742.53 16.00 #REF! #REF! #REF! #REF!
q Rate per 19 to 20.00 m depth from GL 3742.53 17.00 #REF! #REF! 0.0 #REF!
15 BLD-CSTN-3-14-(31)-A: Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using
WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from
approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement
content as per IS code . for FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth)
16 BLD-CSTN-3-14-(31)-B : Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using
WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from
approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement
content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS
Depth of RCC M-30 for Base slab from Ground Basic No. of Delift OH& CP VAT & Total
A Cost Delifts charges @ LC
Level
#REF! 14% 0%
a Rate per 19 to 20.00 m depth from GL Err:509 17.00 #REF! #REF! #REF! #REF!
b Rate per 18 to 19.00 m depth from GL Err:509 16.00 #REF! #REF! #REF! #REF!
c Rate per 17 to 18.00 m depth from GL Err:509 15.00 #REF! #REF! #REF! #REF!
d Rate per 16 to 17.00 m depth from GL Err:509 14.00 #REF! #REF! #REF! #REF!
e Rate per 15 to 16.00 m depth from GL Err:509 13.00 #REF! #REF! #REF! #REF!
f Rate per 14 to 15.00 m depth from GL Err:509 12.00 #REF! #REF! #REF! #REF!
g Rate per 13 to 14.00 m depth from GL Err:509 11.00 #REF! #REF! #REF! #REF!
h Rate per 12 to 13.00 m depth from GL Err:509 10.00 #REF! #REF! #REF! #REF!
i Rate per 11 to 12.00 m depth from GL Err:509 9.00 #REF! #REF! #REF! #REF!
j Rate per 10 to 11.00 m depth from GL Err:509 8.00 #REF! #REF! #REF! #REF!
k Rate per 9 to 10.00 m depth from GL Err:509 7.00 #REF! #REF! #REF! #REF!
l Rate per 8 to 9.00 m depth from GL Err:509 6.00 #REF! #REF! #REF! #REF!
m Rate per 7 to 8.00 m depth from GL Err:509 5.00 #REF! #REF! #REF! #REF!
n Rate per 6 to 7.00 m depth from GL Err:509 4.00 #REF! #REF! #REF! #REF!
o Rate per 5 to 6.00 m depth from GL Err:509 3.00 #REF! #REF! #REF! #REF!
p Rate per 4 to 5.00 m depth from GL Err:509 2.00 #REF! #REF! #REF! #REF!
q Rate per 3 to 4.00 m depth from GL Err:509 1.00 #REF! #REF! 0.0 #REF!
ii Vertical walls of circular faces for Intake well with extra lifts above Ground Level
a Rate per up to 3 m height above GL 450 mm
M-30 GRADE OF MIX 1.00 Cum Err:509 1 Cum Err:509
Lifting of cement concrete for RCC elevated 1.00 Cum #REF! 1 Cum #REF!
reservoir. For every 1m height or part thereof over
the initial lift of 3 m ( item 32. a. of PH SSR - Pg.8
Depth of RCC M-30 for Base slab from Ground Basic Cost No. of Delift OH& CP VAT & Total
A Delifts charges @ LC
Level
#REF! 14% 0%
a Rate per 3 to 4.00 m depth from GL Err:509 1.00 #REF! #REF! #REF! #REF!
b Rate per 4 to 5.00 m depth from GL Err:509 2.00 #REF! #REF! #REF! #REF!
c Rate per 5 to 6.00 m depth from GL Err:509 3.00 #REF! #REF! #REF! #REF!
d Rate per 6 to 7.00 m depth from GL Err:509 4.00 #REF! #REF! #REF! #REF!
e Rate per 7 to 8.00 m depth from GL Err:509 5.00 #REF! #REF! #REF! #REF!
f Rate per 8 to 9.00 m depth from GL Err:509 6.00 #REF! #REF! #REF! #REF!
g Rate per 9 to 10.00 m depth from GL Err:509 7.00 #REF! #REF! #REF! #REF!
h Rate per 10 to 11.00 m depth from GL Err:509 8.00 #REF! #REF! #REF! #REF!
i Rate per 11 to 12.00 m depth from GL Err:509 9.00 #REF! #REF! #REF! #REF!
j Rate per 12 to 13.00 m depth from GL Err:509 10.00 #REF! #REF! #REF! #REF!
k Rate per 13 to 14.00 m depth from GL Err:509 11.00 #REF! #REF! #REF! #REF!
l Rate per 14 to 15.00 m depth from GL Err:509 12.00 #REF! #REF! #REF! #REF!
m Rate per 15 to 16.00 m depth from GL Err:509 13.00 #REF! #REF! #REF! #REF!
n Rate per 16 to 17.00 m depth from GL Err:509 14.00 #REF! #REF! #REF! #REF!
o Rate per 17 to 18.00 m depth from GL Err:509 15.00 #REF! #REF! #REF! #REF!
p Rate per 18 to 19.00 m depth from GL Err:509 16.00 #REF! #REF! #REF! #REF!
q Rate per 19 to 20.00 m depth from GL Err:509 17.00 #REF! #REF! 0.0 #REF!
ii Vertical walls of circular faces for Intake well with extra lifts above Ground Level
a Rate per up to 3 m height above GL 250 mm
M-30 GRADE OF MIX 1.00 Cum Err:509 1 Cum Err:509
Lifting of cement concrete for RCC elevated 1.00 Cum #REF! 1 Cum #REF!
reservoir. For every 1m height or part thereof over
the initial lift of 3 m ( item 32. a. of PH SSR - Pg.8 )
17 BLD-CSTN-3-14-(31)-C: Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using WEIGH
BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved
quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement
content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering,
laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item
of work. for RCC SLABS, BEAMS
447524687.xlsx - data-Road
Rate per One Cum Page 1670 of 2191 Rs Err:509
a for Footings
R.C.C. M 20 Per Cum 1.00 Cum Err:509 1 Cum Err:509
Centering charges ,Pg No. 106 to 108 of Bld. Items 1.00 Cum 288.00 1 Cum 288.00
Labour charges,Pg No. 106 to 108 of Bld. Items 1.00 Cum 631.00 1 Cum 631.00
Add Labour component @ 20% 126.20
Err:509
Overheads & Contractors Profit 14% Err:509
Err:509
VAT & labour cess etc,. 0% Err:509
Rate per 1 Cum Rs Err:509
b Pedastals
R.C.C. M 20 Per Cum 1.00 Cum Err:509 1 Cum Err:509
Centering charges ,Pg No. 106 to 108 of Bld. Items 1.00 Cum 328.00 1 Cum 328.00
Labour charges,Pg No. 106 to 108 of Bld. Items 1.00 Cum 1004.00 1 Cum 1004.00
Add Labour component @ 20% 200.80
Sub - Total Err:509
Overheads & Contractors Profit 14% Err:509
Err:509
447524687.xlsx - data-Road
VAT & labour cess etc,. 0%
Page 1671 of 2191 Err:509
Rate per One Cum Rs Err:509
c Plinth beams
R.C.C. M 20 Per Cum 1.00 Cum Err:509 1 Cum Err:509
Centering charges ,Pg No. 106 to 108 of Bld. Items 1.00 Cum 1390.00 1 Cum 1390.00
Labour charges,Pg No. 106 to 108 of Bld. Items 1.00 Cum 1521.00 1 Cum 1521.00
Add Labour component @ 20% 304.20
Sub - Total Err:509
Overheads & Contractors Profit 14% Err:509
Err:509
VAT & labour cess etc,. 0% Err:509
Total Err:509
Rate per One Cum Rs Err:509
19 BLD-CSTN-3-14-(31)-B: Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using
WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from
approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement
content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS
Vibrator hire charges ( Hire -irrigation -41) 1.333 hour 205.00 1 hour 273.27
1083.87
Water (including for curing) -M-189- SSR- irrigation 1.20 Kl 98.00 1 Kl 117.60
items
BASIC COST per 1 cum Rs Err:509
447524687.xlsx - data-Road
Rate per One Cum for 3.66m height 1.00 Cum
Page 1672 of 2191 Err:509
Add for extra height at 16.666% on every 0.610m 0.557 16.67% = 9.30%
height above 3.66m
Add 0.093 on Centering Charges i.e 355.00 9.30% 33.02
Add 0.093 on Centering Charges i.e 2268.00 9.30% 210.92
Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum for 4.00m height Rs Err:509
447524687.xlsx - data-Road
Centering charges ,Pg No.340 of Bld.SSR for 1673 of13.14
Page 2191 sqm 1332.00 1 Cum 17499.28
ELSRs
Add for extra height 9.0% 1574.94
Basic Cost Rs Err:509
Overheads & Contractors Profit @ 14% 14.00% Err:509
Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum Rs Err:509
Labour charges,Pg No. 106 to 108 of Bld. Items 1.00 Cum 1615.00 1 Cum 1615.00
Add Labour component @ 20% 323.00
Sub - Total Rs Err:509
Overheads & Contractors Profit 14% Err:509
Err:509
VAT & labour cess etc,. 0% Err:509
Total Err:509
Rate per One Cum Rs Err:509
Labour charges,Pg No. 106 to 108 of Bld. Items 1.00 Cum Err:509 1 Cum Err:509
Add Labour component @ 20% Err:509
Sub - Total Rs Err:509
Overheads & Contractors Profit 14% Err:509
Err:509
VAT & labour cess etc,. 0% Err:509
Total Err:509
Rate per One Cum Rs Err:509
20 BLD-CSTN-3-14-(31)-C : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using
WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from
approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement
content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering,
laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item
of work. for RCC SLABS, BEAMS
447524687.xlsx - data-Road
Vibrator hire charges ( Hire -irrigation -41) Page 1674 of0.308
2191 hour 205.00 1 hour 63.14
250.43
Water (including for curing) -M-189- SSR- irrigation 1.200 Kl 98.00 1 Kl 117.60
items
BASIC COST per 1 cum Rs Err:509
Labour charges,Pg No. 106 to 108 of Bld. Items 8.000 Sqm 215.00 1 Sqm 1720.00
Add Labour component @ 20% 344.00
Rs Err:509
Overheads & Contractors Profit 14% Err:509
Total Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum for 3.66m height Rs Err:509
h RCC M 20 Beams at 15m Height 0.23 0.45 m size 9.66 Sqm 1.36m
Cost of M- 20 grade mix 1.00 Cum Err:509 1 Cum Err:509
Centering charges for Columns and Beams ,Pg 13.14 sqm 1332.00 1 Cum 17499.28
No.7-31.a (7) for ELSRs- PH SSR
447524687.xlsx - data-Road
Basic Cost
Page 1679 of 2191 Rs Err:509
Overheads & Contractors Profit @ 14% 14.00% Err:509
Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum Rs Err:509
i RCC M 20 Beams from 15.00 m. to 18.00m 0.23 0.45 m size 9.66 Sqm 1.36m
Rate per One Cum 1.00 Cum Err:509 1 Cum Err:509
Centering charges for Columns and Beams ,Pg 13.14 sqm 1332.00 1 Cum 17499.28
No.7-31.a (7) for ELSRs- PH SSR
Add for extra height 9.0% 1574.94
Basic Cost Rs Err:509
Overheads & Contractors Profit @ 14% 14.00% Err:509
Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum Rs Err:509
12 BLD-CSTN-8-11-(86): RCM facia 5cm thick in CM (1:3) for drop walls, fins with rabbit wire mesh & nominal
reinforcement as directed by Engineer-in-charge with dubara sponge finishing, including cost & conveyance of all
materials to site, seigniorage charges, sales & other taxes on all materials, operational & incidental, cost and
conveyance of cement, wire mesh, water to work site, centering, scaffolding and form work, lift charges etc.,
complete for finished items of work but excluding cost of steel & its fabrication charges, for finished item of work.
(APSS No.403 & 903)
Unit - 10 sqm
A) MATERIALS
Rabbit wire mesh (1.0 M panna for 0.6 M drop) 13.30 sqm 19.00 1 sqm 252.70
BMT-F.28- Sn-156- Pg.No…... of Bld.SSR.
Cement Mortar 1:3 for 25 mm thick (Mortars-" d ") 0.25 cum 1 cum 969.41
3877.65
Dry Cement for making Lumps 50.00 kg 4.60 1 kg 230.00
12 mm Plastering 2 coats in 1:4 & 1:2 cm both 21.80 sqm 1409.65 10 sqm 3073.04
sides Excluding HYSD Steel/ Mild steel & Binding
wire
B) LABOUR CHARGES
Mason 1st class (labour-Irrigation.S.N.11) 8.00 day 564.00 1 day 4512.00
447524687.xlsx - data-Road
Miller Operator (labour-Irrigation.S.N.16) 1.00 day
Page 1680 of 2191 444.00 1 day 444.00
Mazdoor (irri-Un skilled-Sn.3) 10.00 day 510.00 1 day 5100.00
c) Machinery
Machine Mixing Mortar with Miller - (Hire charges 2.00 Hrs 397.50 1 Hrs 795.00
-Irrigation-S.No.16)
Total Rs 15376.15
over heads & contractors profit 13.615% 2093.46
Grand Total for 10 Sqm 17469.61
Rate per 1 sqm Rs 1746.96
VAT & labour cess etc,. 0% 0.00
Rate per 1 Sqm Rs 1746.96
13 BLD-CSTN-8-1-(76) : Plastering with 12mm thick in single coat in CM (1:3) using Sulphate Resistant Cementm
finished smooth including cost and conveyance of all materials to site, seigniorage charges on all materials,
finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever
necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:3) (Mortars-" d ") 0.150 Cum 3877.65 1 Cum 581.65
B. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11) 0.600 Nos 564.00 1 Nos 338.40
Mazdoor (irri-Un skilled-Sn.3) 0.960 Nos 510.00 1 Nos 489.60
Total A+B 1409.65
C.Overheads & Contractors Profit 13.615% 191.92
Grand Total 1601.57
VAT & labour cess etc,. 0% 0.00
Rate per 10 Sqm Rs 1601.57
Rate for other Floors 1F 2F 3F 4F 5F
Basic rate per 1Cum 1601.57 1601.57 1601.57 1601.57 1601.57
Material Hire Charges for Scaffolding (Pg.No.108- 10.30 10.30 10.30 10.30 10.30
Bld.SSR)
Labour Charges for Scaffolding (Pg.No.108- 79.50 113.80 148.00 182.40 216.70
Bld.SSR)
Add extra over Labour component 15.90 22.76 29.60 36.48 43.34
For Material lift Charges & Labour rate for 39.75 79.50 119.25 159.00
scaffolding above 7.32 M - increase @ 50%
Total 1707.27 1788.18 1868.97 1950.00 2030.91
14 BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of
4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand ,
Water, etc., to site, seigniorage charges, all operational, including charges, labour charges for mixing mortar,
finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished
item of work of uneven surfaces of walls. (External walls)
Unit = 10 sqm
A. MATERIALS:
Base Coat in CM(1:6), 16 mm thick
cement (ENC-PH.Memo.No.146/Cement &Steel 43.00 Kg 4.60 1 Kg 197.80
/T1)
Sand ( Lead statement-S.N.3 ) 0.18 Cum 1493.00 1 Cum 268.74
Top Coat in CM(1:4), 4 mm thick
cement (ENC-PH.Memo.No.146/Cement &Steel 14.50 Kg 4.60 1 Kg 66.70
/T1)
Sand ( Lead statement-S.N.3 ) 0.04 Cum 1493.00 1 Cum 59.72
B. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11) 0.63 day 564.00 1 day 355.32
2nd Class Mason (labour-Irrigation.S.N.35) 1.47 day 540.00 1 day 793.80
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 3.90 day 510.00 1 day 1989.00
Total 3731.08
C.Overheads & Contractors Profit 14% 0.00
3731.08
VAT & labour cess etc,. 0% 0.00
Rate per 10 Sqm Rs 3731.08
15 BLD-CSTN-8-8-(83) ; Plastering with 20mm thick in single coat in CM (1:3) finished smooth including cost and
conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all
operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for
finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:3) (Mortars-" d ") 0.21 Cum 3877.65 1 Cum 814.31
B. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11) 0.94 Nos 564.00 1 Nos 530.16
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 0.16 Nos 510.00 1 Nos 81.60
Total A+B 1426.07
C.Overheads & Contractors Profit 14% 194.16
Grand Total 1620.23
VAT & labour cess etc,. 0% 0.00
Rate per 10 Sqm Rs 1620.23
Rate for other Floors 1F 2F 3F 4F 5F
Basic rate per 1Cum 1620.23 1620.23 1620.23 1620.23 1620.23
Material Hire Charges for Scaffolding (Pg.108 of 10.30 10.30 10.30 10.30 10.30
Bld.SSR)
Labour Charges for Scaffolding (Pg.108 of 79.50 79.50 79.50 79.50 79.50
Bld.SSR)
Add extra over Labour component 15.90 15.90 15.90 15.90 15.90
For Material lift Charges & Labour rate for 39.75 79.50 119.25 159.00
scaffolding above 7.32 M - increase @ 50%
Total 1725.93 1765.68 1805.43 1845.18 1884.93
16 Suply, delivery and fixing of C.I. heavy weight manhole frame and cover in the roof slab incuding labour charges for
fixing and all incidental and operational charges as directed by the Engineer in Charge..
Weight of C.I. heavy weight manhole frame and 1 Kg 103.820 1 Kg 103.82
cover 90 Kg each( 2 x 90 ) = 180 Kg- rate as per CI
specials vide This data book
Total Rs 103.82
Cost of Man hole frame in Kg Rs 103.82
17 IRR-DAW-2-12: Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N /
sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates including cost of
all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position,
levelling, vibrating, finishing, curing etc.,complete for RCC ornamental parapet consisting of 35 cm x 20 cm kerb,
35 cm x 35 cm x 1 m pillars spaced approximately at 3.5 m apart, 20 cm x 15 cm posts 80 cm height approximately
30 cm c / c with 12.5 cm thick and 35 cm wide coping slab for posts and pillars with top edges of kerb and coping
chamferred or rounded as directed etc., complete ( excluding cost of providing and placing reinforcement steel and
gate ) with initial lead upto 1 km and all lifts. ( Cement content : 300 kg / cum with use of super plasticiser(0.4% by
wt. of cement, CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.44 cum)
Unit 36 Rmt
A. MATERIALS:
Cement mix 2450 kg 4.60 1 kg 11270.00
Cenent for incidentals @ 5 kg / cum 35.00 kg 4.60 1 kg 161.00
Coarse aggregate 20-10 mm ( C-Mat-Sn.47) 3.64 cum Err:509 1 cum Err:509
Coarse aggregate 10-4.75 mm ( C-Mat-Sn.58) 1.96 cum Err:509 1 cum Err:509
Fine aggregate ( screened ) ( C-Mat-Sn.3) 3.08 cum 1493.00 1 cum 4598.44
Super plasticiser - (Irri. SSR. Sn.70, Pg. 14) 9.80 kg #REF! 1 kg #REF!
Use rate of shuttering (rate as per Sub- data) 115.00 sqm Err:509 1 sqm Err:509
Scaffolding of shuttering @ 15% Err:509
447524687.xlsx - data-Road
Sundries 2.00 LS
Page 1682 of 2191 30.00
Err:509
B. MACHINERY:
Concrete mixer 300 / 200 ltr ( ele 8.00 Hour 608.10 1 Hour 4864.80
Needle vibrator 40 mm ( ele ) 8.00 Hour 205.00 1 Hour 1640.00
10 hp pump ( ele ) 0.50 Hour 189.30 1 Hour 94.65
6599.45
C. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11) 2.00 Day 564.00 1 Day 1128.00
work inspector ( Labour - irrigation- Sn. 10 ) 1.00 Day 678.00 1 Day 678.00
mazdoor ( Labour - Irrigation- Un skilled Sn.3)
for batching cement ( cement handling ) 2.00 Day 510.00 1 Day 1020.00
for batching other materials 9.00 Day 510.00 1 Day 4590.00
for loading mortar pans 4.00 Day 510.00 1 Day 2040.00
for laying & packing concrete 2.00 Day 510.00 1 Day 1020.00
for conveying concrete 7.00 Day 510.00 1 Day 3570.00
for curing & miscellaneous 2.00 Day 510.00 1 Day 1020.00
Labour for shuttering ( Rate as per Sub-data) 115.00 sqm 119.16 1 sqm 13703.40
Labour for scaffolding @ 15% 2055.51
30824.91
Total of A+B+C Err:509
D. Add for contractor's profit and overheads on 14% Err:509
(A+B+C) Err:509 Err:509
VAT & labour cess etc,. 0% Err:509
Err:509
Rate per 1 Rmt Err:509
18 RBR-SPST-8: Providing fitting and fixing mild steel railing complete as per drawing and technical specifications
Clause 1208.2 MORD / 1900 & 2703 MORTH.
Unit = Running m
Taking output = 100 m (2 x 50 m span) 100 m
(a) Material
IS MC 100=2.806x1.05=2.946 t 2.946 t 44500 1t 131097.00
MS Flats = 0.964x1.05 =1.012 t 1.01 t 44500 1t 44945.00
MS bars = 0.17x1.05=0.18 t 0.18 t 44500 1t 8010.00
MS bolts, nuts and washers, Sn-55, Pg.13-Irri.SSR 150.00 kg #REF! 1 kg #REF!
(b) Labour
Mate - day
Blacksmith ( Labour-Skilled-Irrigation-Sn.2) 30.00 day 564.00 1 day 16920.00
Mazdoor (Unskilled) 42.80 day 510.00 1 day 21828.00
(c) Add 5 percent of (a) for painting one shop coat 5.00% #REF! #REF!
with red oxide primer and three coats of synthetic
enamel paint.
(d) Add for cost of concrete for fixing vertical post in 1.00% #REF! #REF!
the preformed recess @ 1 per cent of (a)
(e) Add for electricity charges, welding and drilling 1.00% #REF! #REF!
equipment, electrodes and other consumables @ 1
per cent of (a)
#REF!
f&g) Overheads & Contractors Profit 14% #REF!
Cost for 100 m = (a+b+c+d+e+f+g) #REF!
Rate per m = (a+b+c+d+e+f+g)/100 #REF!
VAT & labour cess etc,. 0% #REF!
Rate per Rmt Rs #REF!
Note : A typical drawing for MS railing has been followed for estimate purpose. Rate may be worked out as per
design to be followed
19 Supply and Fixing in position of MS heavy structural steel including cost and conveyance of all material , labour
charges for fabrication and fixing in postion etc,. Complete.
447524687.xlsx - data-Road
Cost of Mild Steel, structural steel, i.e. Page 1683 of 21911 Kg 44.50 1 Kg 44.50
Angles,channels and "I" sections
Transportation of material for 20.00Km lead 1 Kg 371.17 1000 Kg 0.37
Labour charges for fabrication -BMM-V.16 - Sn-936 1 Kg #REF! 1 Kg #REF!
Add Municipal allowence on labour component 20% #REF!
Labour charges for fixing - BMM-V.17 - Sn.937 1 Kg #REF! 1 Kg #REF!
Add Municipal allowence on labour component 20% #REF!
#REF!
over heads & contractors profit 14% #REF!
#REF!
VAT & labour cess etc,. 0% #REF!
Rate per 1 Kg Rs #REF!
20 BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor
1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of
Seigniorage charges on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift
charges , curing charges etc., complete for finished item of work
A. MATERIALS:
Ground moulded size 23x11x7 Cm - (1:6)
21 Supply and fixing in position of Casuarina Balli Props of size - 4" to 8" dia - 20'-0" Height including fixing in required
position, driving in to the ground up to a depth of 1/4th length of the balli and tying with nylon ropes etc etc, complete
BMC-X.06 : Basic cost Sl.No 964 of Pg No.90 1 No #REF! 1 No #REF!
Add labour charges @ 20% of the balli cost #REF!
Add for Nylon ropes etc @ 5% #REF!
Rate per 1 No #REF!
22 Supply and fixing in position of Casuarina Balli Props - 3" to 4" dia - 12'-0" Height including fixing in required
position, driving in to the ground up to a depth of 1/4th length of the balli and tying with nylon ropes etc etc, complete
447524687.xlsx - data-Road
Filling and Laying in position of Sand Bags in the
Page 1684 of 2191
stipulated places including cost of empty cement
bag, sand, thread, stiching charges and labour
charges with 14%overhead charges and 30 bags #REF! 1 Each #REF!
contractors profits - Irrigation SSR - under
Miscellaneous Items, Sn. 2 of Pg.35
24 Observed data based on IRR-CCDW1-8 : Providing and fixing 1.50 m long cold twisted deformed steel Anchor
rods with 0.75m length driven in to the hole drilled in bed rock and remaining length embedded in concrete/ masonry
including cost of all materials, machinary, labour, drilling and cleaning hole, driving Anchore rod, grouting hole with
thick cement slurry etc, with intial lead up to 50m and all lifts.
b Unit - 10 Nos 16 mm dia
A) MATERIALS
16mm dia Steel (including 5% Wastage) 10 Nos of 23.70 Kg 44.50 1 Kg 1054.65
1.50m length ( 10x1.5x1.58) = 23.70 Kg
Drilling of 20mm dia holes by Pneumatic 10 Nos #REF! 1 Nos #REF!
Compressor Sl No.141 Pg No. 19 of R & B SoR
Grouting 20mm dia holes with neat cement slurry 10 Nos #REF! 1 Nos #REF!
Sl No.144 Pg No. 19 of R & B SoR
B) LABOUR CHARGES
Bar Bender ( Labour-Skilled-Irri.SSR, Sn.1) 0.50 day 678.00 1 day 339.00
2nd Class Mason (labour-Irrigation.S.N.35) 0.50 day 540.00 1 day 270.00
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 1.00 day 510.00 1 day 510.00
Rate per 10 Nos Rs #REF!
Rate per 1 Nos Rs #REF!
VAT & Labour cess 0% #REF!
Rate per Each Rs #REF!
25 Providing, erecting triple spur gear type Chain Pulley Block suitable for capacity as below with 6 m lift complete with
load chain and hand chain suitable for above lift, tested to 50% over load as per IS 3832 carrying ISI mark.
3 Tonne Capacity ( Rate as per Maharastra ( MJP 1 No 21841.00 1 No 21841.00
Elec & Mech. CSR-2012-13 - section -4, LF 1-3 )
Erection charges 1 job 291.00 1 job 291.00
22132.00
c.Overheads & Contractors Profit 14% 3013
25145.00
VAT & Labour cess 0% 0.00
Grand Total 25145.00
Rate per Each Rs 25145.00
26 Supply delivery and installation of mannually cleaned Stainless Steel bars ( screening confriming to IS6280 as per
drawing) to fit in 45cms clhanned with 0.6 m depth and angle of screen tto flows with c/c distance of 30mm for
coarse screen and 20mm for fine screen . includiong cost and conveyance of all material installation, transportation
all labour charges, including fabrication charges etc complete and directed by Engineer - in charge
27 RBR-FNDN-4 - G: Providing concrete for plain/reinforced concrete in open foundations using 20 mm nominal size
Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing
for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500,
1700 & 2100 MORTH.
R.C.C. grade M 35 Design Mix using 20 mm Graded Metal (MORTH 12.8.H)
Case 1 : Using Concrete Mixer
Unit = cum
(a) Material
Cement 0.422 MT 4600.00 1 MT 1941.20
Coarse sand ( C-mat- Sn.2) 0.45 cum 1303.00 1 cum 586.35
20 mm aggregate ( C-mat- Sn.55) 0.54 cum Err:509 1 cum Err:509
10 mm aggregate ( C-mat- Sn.53) 0.36 cum Err:509 1 cum Err:509
(b) Labour
Mate - day
Mason (1st Class) 0.10 day 564.00 1 day 56.40
Mazdoor (Unskilled) 1.39 day 510.00 1 day 708.90
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity 0.40 hour 397.50 1 hour 159.00
Generator 33 KVA 0.40 hour 1007.20 1 hour 402.88
Total of a+b+c Err:509
(d) Formwork @ 3% on (a+b+c) 3.00% Err:509
Err:509
e&f) Overheads & Contractors Profit 14% Err:509
Cost for 1 Cum = a+b+c+d+e+f Err:509
VAT & Labour cess 0% Err:509
Rate per Cum Rs Err:509
28 RBR-FNDN-11: Providing and Laying Cutting Edge of Mild Steel weighing 40 kg per metre for Well Foundation
complete as per Drawing and Technical Specification 1204, 1900 MORTH.
Unit = 1 MT
Taking output = 1 MT
a) Material
Structural steel in plates, angles, etc including 5 per 1.05 MT 44500.00 1 MT 46725.00
cent wastage
Nuts & bolts ( MS- Sl No.55 of Pg 13 -irrigation 20.00 Kg #REF! 1 Kg #REF!
items)
b) Labour
(for cutting, bending, making holes, joining, welding
and erecting in position)
Mate - day
Fitter ( S.N. 6 of Irrigation labour) 5.50 day 648.00 1 day 3564.00
Blacksmith ( S.N. 2 of Irrigation labour) 5.50 day 564.00 1 day 3102.00
Welder ( S.N. 41 of Irrigation labour) 5.50 day 600.00 1 day 3300.00
Mazdoor (Unskilled) 17.82 day 510.00 1 day 9088.20
Electrodes, cutting gas and other consumables @ 4672.5
10 per cent of cost of (a) above
Handling loading and unloading on (a) RBR-LUCC-5 1.05 MT 155.14 1 MT 162.90
Hire charges of Welding machine on (a) (irr-Hire- 20.00 hour 122.40 1 hour 2448.00
66)
Total Rs #REF!
Overheads & Contractors Profit 14% #REF!
Grand Total #REF!
VAT & Labour cess 0% #REF!
Rate per MT Rs #REF!
447524687.xlsx - data-Road
29 RBR-FNDN-12 A-iii : Plain/Reinforced Cement Concrete,
Page 1686 ofin2191
Well Foundation complete as per Drawing and Technical
Specification 1200, 1500 & 1700 MORTH. For Well Curb
Unit = 1 cum
Taking output = 1 cum
RCC M35 Grade
Same as for 4(H) except for formwork which shall
be@ 20 per cent of the cost of concrete instead of
3.0
Caseper1 cent.
: Using Concrete Mixer /Batching plant
as per Item. No.32 rate per Cum- Basic Cost of 1.00 cum Err:509 1 cum Err:509
Labour, Material & Machinery (a+b+c)
d) formwork @ 20 per cent of the cost of 20.00% Err:509
concrete Err:509
Overheads & Contractors Profit 14% Err:509
Grand Total Err:509
VAT & Labour cess 0% Err:509
Rate per Rmt Rs Err:509
30 RBR-FNDN-12 B-VIII: Plain/Reinforced Cement Concrete, in Well Foundation complete as per Drawing and
Technical Specification 1200, 1500 & 1700 MORTH. For Well Staining
Unit = 1 cum
Taking out put = 1 cum
RCC M35 Grade
Same as for 4 (H) except for formwork which shall
be @ 10 per cent of the cost of concrete instead of
3 per cent
Case 1 : Using Concrete Mixer /Batching plant
as per Item. No.32 rate per Cum- Basic Cost of 1.00 cum Err:509 1 cum Err:509
Labour, Material & Machinery (a+b+c)
d) formwork @ 20 per cent of the cost of 10.00% Err:509
concrete Err:509
Overheads & Contractors Profit 14% Err:509
Grand Total Err:509
VAT & Labour cess 0% Err:509
Rate per Rmt Rs Err:509
31 RBR-FNDN-12 C - iv : Plain/Reinforced Cement Concrete, in Well Foundation complete as per Drawing and
Technical Specification 1200, 1500 & 1700 MORTH. for Bottom Plug
Case 1 : Using Concrete Mixer
Unit = 1 cum - PCC Grade M35 Design Mix
Taking output = 15 cum
a) Material
Cement 6.29 MT 4600.00 1 MT 28934.00
Coarse sand 6.75 cum 1303.00 1 cum 8795.25
40 mm Aggregate 5.40 cum 1256.20 1 cum 6783.48
20 mm Aggregate 5.40 cum Err:509 1 cum Err:509
10 mm Aggregate 2.70 cum Err:509 1 cum Err:509
Admixture -(M-180) - Pg.34 of Irri-SoR 21.60 Kg #REF! 1 Kg #REF!
b) Labour
Mate - day
Mason 1.50 day 564.00 1 day 846.00
Mazdoor (Unskilled) 20.90 day 510.00 1 day 10659.00
c) Machinery
Concrete mixer (cap. 0.40/0.28 cum) 6.00 hour 397.50 1 hour 2385.00
Generator 33 KVA 6.00 hour 1007.20 1 hour 6043.20
Light Crane of 3 tonnes capacity for handling 6.00 hour 394.24 1 hour 2365.44
tremie pipe ( Hire-R&B - Sn.34)
Add 5 per cent of cost of material and labour Err:509
towards cost of forming sump, protective bunds,
chiselling and making arrangements for under
water concreting with tremie pipe.
Err:509
447524687.xlsx - data-Road
Overheads & Contractors Profit 14%
Page 1687 of 2191 Err:509
Err:509
VAT & Labour cess 0% Err:509
cost of 15 cum = a+b+c+d+e Err:509
Rate per cum = (a+b+c+d+e)/15 Rs Err:509
32 RBR-FNDN-12 F - iv : Plain/Reinforced Cement Concrete, in Well Foundation complete as per Drawing and
Technical Specification 1200, 1500 & 1700 MORTH. for Well Cap
Case 1 : Using Concrete Mixer
Unit = 1 cum - PCC Grade M35 Design Mix
Taking output = 15 cum
a) Material
Cement 6.33 MT 4600.00 1 MT 29118.00
Coarse sand 6.75 cum 1303.00 1 cum 8795.25
20 mm Aggregate 8.10 cum Err:509 1 cum Err:509
10 mm Aggregate 5.40 cum Err:509 1 cum Err:509
b) Labour
Mate - day 0.00
Mason 1.50 day 564.00 1 day 846.00
Mazdoor (Unskilled) 20.86 day 510.00 1 day 10638.60
c) Machinery
Concrete mixer (cap. 0.40/0.28 cum) 6.00 hour 397.50 1 hour 2385.00
Generator 33 KVA 6.00 hour 1007.20 1 hour 6043.20
Err:509
Formwork @ 3 per cent of (a+b+c) 3.00% Err:509
Err:509
d&e) Overheads & Contractors Profit 14% Err:509
Err:509
VAT & Labour cess 0% Err:509
cost of 15 cum = a+b+c+d+e Err:509
Rate per cum = (a+b+c+d+e)/15 Rs Err:509
33 RBR-FNDN-13 : A : Sinking of 6 m external diameter well (other than pneumatic method of sinking) through all types
of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical
specifications 1207 MORTH. Depth of sinking is reckoned from bed level.
Note : To arrive proportionate quantities keeping
the cross sectional area & depth (22/7xd2xh) for
lesser diametre wells than 6m
Unit = Running Meter.
Taking output = 1 m
Diameter of well - 6 m.
Sandy Soil
a Depth below bed level upto 3.0 M
Rate of sinking = 0.50 m per hour.
a) Labour
Mate - day
Sinker ( skilled ) ( R&B - Labour-Skilled-Sn.13) 1.00 day 678.00 1 day 678.00
Sinking helper( semi-skilled ) ( Irri- Labour-S.S- 2.12 day 540.00 1 day 1144.80
Sn.4)
b) Machinery
Hire & running charges of crane with grab bucket of 2.00 hour 2419.20 1 hour 4838.40
0.75 cum capacity and accessories.( R&B-Sn.35-d)
Consumables in sinking @10 per cent of (b) 10.00% 483.84
7145.04
Overheads & Contractors Profit 1000.31
Grand Total 8145.35
VAT & Labour cess 0% 0.00
Rate per Rmt Rs 8145.35
34 in accordance with RBR-FNDN-13 : A : Sinking of 5.10 m external diameter well (other than pneumatic method of
sinking) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as
per drawing and technical specifications 1207 MORTH. Depth of sinking is reckoned from bed level.
Note : To arrive proportionate quantities keeping
the cross sectional area & depth (22/7xd2xh) for
lesser diametre wells than 6m
Unit = Running Meter.
Taking output = 1 m
Diameter of well - 5.1 m. 5.10 m dia
Sandy Soil
a Depth below bed level upto 3.0 M
Rate of sinking = 0.50 m per hour.
a) Labour
Mate - day
Sinker ( skilled ) 0.85 day 678.00 1 day 576.30
Sinking helper ( semi-skilled ) 1.80 day 540.00 1 day 972.00
b) Machinery
Hire & running charges of crane with grab bucket of 1.70 hour 2419.20 1 hour 4112.64
0.75 cum capacity and accessories.
Consumables in sinking @10 per cent of (b) 10.00% 411.26
6072.20
Overheads & Contractors Profit 850.11
Grand Total 6922.31
VAT & Labour cess 0% 0.00
Rate per Rmt Rs 6922.31
35 RBR-FNDN-14 : A: Sinking of 7 m external diameter well (other than pneumatic method of sinking) through all types
of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical
specifications 1207 MORTH. Depth of sinking is reckoned from bed level.
Unit = Running Meter.
Taking output = 1 m
Diameter of well - 7 m.
Clayee Soil
a Depth below bed level upto 3.0 M
Rate of sinking = 0.30 m per hour.
a) Labour
Mate - day
Sinker ( skilled ) 1.50 day 678.00 1 day 1017.00
Sinking helper ( semi-skilled ) 3.18 day 540.00 1 day 1717.20
b) Machinery
Hire & running charges of crane with grab bucket of 4.50 hour 2419.20 1 hour 10886.40
0.75 cum capacity and accessories.
Consumables in sinking @10 per cent of (b) 10.00% 1088.64
14709.24
Overheads & Contractors Profit 2059.29
Grand Total 16768.53
VAT & Labour cess 0% 0.00
Rate per Rmt Rs 16768.53
36 RBR-FNDN-30: Driven precast vertical M 35 grade with a minimum cement content of 420 kg / cum R.C.C piles
excluding reinforcement - 500 mm diameter pile (using crane, vibrating pile driving hammer with power unit)
including the cost of materials, labour and transportation cost @ 1% of material and machinery as per Drawing and &
Technical Specification in Section 1100 & 1700 MORTH
Pile Diameter = 500 mm
Unit = Running Meter
Taking output = 60 m
a) Materials
RCC Grade M35 11.78 cum Err:509 1 cum Err:509
Rate for concrete may be adopted same as for
bottom plug vide item no. 12( F ) (IV)
b ) Material Pile shoes
a) C.I Shoes -M-080, Pg No.29 of irri.SoR 240.00 Kg #REF! 1 Kg #REF!
b) M.S. shoes -Yanam-PSR-2013-14, Pg.68 105.00 Kg 54.00 1 Kg 5670.00
c) Steel helmet and cushion block on top of pile 30.00 Kg 54.00 1 Kg 1620.00
head during driving.-M-173, Pg No.33
c) Machinery
Crane 20 t capacity 6.00 hour 885.92 1 hour 5315.52
Vibrating Pile driving hammer complete with power 6.00 hour 35420.00 1 hour 212520.00
unit and accessories.( Rate adopted from Yanam
-PSR-2013-14-Code No.0027, Sn.18, Pg.1)
d) Labour
Mate/Supervisor - day
Mazdoor (Unskilled) 3.12 day 510.00 1 day 1591.20
Add 1 per cent of (a+b+c) for carriage of piles 1% on Rs. #REF! #REF!
from casting yard to work site and stacking, and
other imponderables during installation.
#REF!
e&f) Overheads & Contractors Profit 14% #REF!
Cost for 60 m = a+b+c+d+e+f #REF!
Rate per metre (a+b+c+d+e+f)/60 #REF!
VAT & Labour cess 0% #REF!
Rate per Rmt Rs #REF!
37 RBR-FNDN-39 - 39.i : Cement Concrete for Reinforced Concrete in Pile Cap complete as per Drawing and Technical
Specifications in Section 1100, 1500 & 1700 MORTH
A. RCC Grade M20 (Design Mix)
Unit = cum
Taking output = 15 cum
Using Concrete Mixer
a) Material
Cement 5.12 t 4600.00 1t 23552.00
Coarse sand 6.75 cum 1303.00 1 cum 8795.25
447524687.xlsx - data-Road
20 mm Aggregate Page 1691 of 8.10
2191cum Err:509 1 cum Err:509
10 mm Aggregate 5.40 cum Err:509 1 cum Err:509
b) Labour
Mate - day
Mason 1.50 day 564.00 1 day 846.00
Mazdoor (Unskilled) for concreting 20.90 day 510.00 1 day 10659.00
Mazdoor (Unskilled) for breaking pile head, 1.00 day 510.00 1 day 510.00
bending bars, cleaning etc.
c) Machinery
Concrete mixer (cap. 0.40/0.28 cum) 6.00 hour 397.50 1 hour 2385.00
Generator (capacity 33 KVA) 6.00 hour 1007.20 1 hour 6043.20
Err:509
Formwork @ 4 per cent on cost of concrete i.e. 4% Err:509
cost of a) Material, b) Labour and
c) Machinery
Sub - Total Err:509
d&e) Overheads & Contractors Profit 14% Err:509
Err:509
VAT & Labour cess 0% Err:509
Cost for 15 cum = a+b+c+d+e Rs Err:509
Rate per metre (a+b+c+d+e)/15 Err:509
38 RBR-FNDN-7 : Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and
technical specifications Clauses 1000 and 1202 MORD & 1100, 1600 MORTH for Bars below 36 mm dia including
over laps and wastage, where they are not welded.
Unit = t
(a) Material
HYSD bars including 5 per cent for overlaps and 1.05 t Err:509 1t Err:509
wastage
Binding wire 6.00 kg #REF! 1 kg #REF!
(b) Labour for cutting, bending, shifting to site,
tying and placing in position
Mate - day
Blacksmith 2.00 day 564.00 1 day 1128.00
Mazdoor (Unskilled) 6.40 day 510.00 1 day 3264.00
Err:509
c&d) Overheads & Contractors Profit 14% Err:509
Rate per 1 MT( = a+b+c+d) Err:509
VAT & Labour cess 0% Err:509
Err:509
Rate per 1 Kg Err:509
39 RBR-FNDN-10-A : Providing and Constructing Temporary Island 16 m diameter for Construction of Well Foundation
for 8m dia. Well as per Tech. Specification 1203 MORTH.
A Assuming depth of water 1.0 m and height of
island to be 1.25 m.
Unit = 1 No
Taking output = 1 No.
a) Material
Earth (compacted) 251.20 cum 115.26 1 cum 28953.31
Sand bags 750.00 each #REF! 1 each #REF!
b) Labour
Mate - day
Mazdoor for filling sand bags, stitching and placing 15.40 day 1 day 7854.00
510.00
c) Machinery
Crane with grab 1 cum capacity (Hire- R&B-Sn.35) 20.00 hour 1 hour 79116.80
3955.84
#REF!
Consumables @ 2.5 per cent of (c) above 2.50% #REF!
#REF!
d&e) Overheads & Contractors Profit 14% #REF!
Rate per No. (a+b+c+d+e) #REF!
447524687.xlsx - data-Road
Note : It is assumed that earth will be available within the
Pageworking space of crane with grab bucket.
1692 of 2191
C RBR-FNDN-10-C:Providing and constructing one span service road to reach island location from one pier location to
another pier location as per Tech. Specification 1203 MORTH.
Assuming span length 30 m, width of service road
10m and depth of water 1m
Unit = 1 meter
Taking output = 30 metre
a) Material
Earth 450.00 cum 115.26 1 cum 51867.00
Sand bags 300.00 each #REF! 1 each #REF!
b) Labour
Mate - day 0.00
Mazdoor (Unskilled) for filling sand bags, stitching 6.24 day 510.00 1 day 3182.40
and placing
c) Machinery
Front end Loader 1 cum capacity 27.00 hour 1843.52 1 hour 49775.04
Tipper 5.5 cum capacity 28.00 hour 924.10 1 hour 25874.80
#REF!
d&e) Overheads & Contractors Profit 14% #REF!
Cost for 30 m = (a+b+c+d+e) #REF!
Rate per m = (a+b+c+d+e)/30 #REF!
40 Providing and fixing M.S.chequerred plate flooring of 6mm thickness supported on M.S.Girders including welding,
cutting and fabricating the plates to the required square or rounding shape, making holes in the plate, including
providing and applying 3 coats of anti corrosive paint, etc.complete as directed by Engineer-in-charge.
6mm thick M.S.chequerred plate @ 56.15 Kg/Sqm 56.15 Kg #REF! 1 Kg #REF!
41 in accordance with IRR-PMW-3-18 : Providing two coats of painting 100 micron dry film thickness each coat to
embedded parts / gates with cold applied coal tar epoxy paint of approved quality including removing rust, cleaning
surface, cost of all materials, labour, scaffolding etc., all lifts.complete with all leads and all lifts.
Unit 100 Sqm
Coal tar epoxy paint - irrigation SSR-86, Pg.15 34.00 ltr #REF! 1 ltr #REF!
Sundries ( rust remover / brush etc ) as per Irri. data 4.00 LS 30.00 1 No 120.00
Add for scaffolding / ladder etc @ 10% #REF!
Painter Class-II ( Labour-Irri-Semi skilled-Sn.37) 13.00 Day 540.00 1 No 7020.00
mazdoor 6.00 Day 510.00 1 No 3060.00
Cost for 100 Sqm = #REF!
Rate per Sqm = (a+b+c+d+e)/100 #REF!
d&e) Overheads & Contractors Profit 14% #REF!
Rate per 1 Sqm #REF!
42 Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together through
their entire length and jointed together at the ends by end-locks, mounted on specially designed pipe shaft of 50mm
dia nominal bore MS B class pipe with brackets, plates, guide channels, stoppers, bottom locking plates and
arrangements for inside & outside locking with push-pull operations including cost of hood cover and springs
complete, painted with one coat of approved steel primer, locks, ball bearings, all accessories etc complete for
finished item of work as per special spn: 1108
Rate as per SSR Item No. 156,Pg 18 -BMT-F.29 1.00 Sqm #REF! 1 Sqm #REF!
over heads & contractors profit 14% #REF!
Sub-Total #REF!
VAT & Labour cess 0% #REF!
447524687.xlsx - data-Road
Rate per 1 Sqm Page 1693 of 2191 Rs #REF!
43 BMT-P.25: NCL or Equivalent ECO 3000 SERIES WINDOWS (SUITABLE FOR RESIDENTIAL BUILDINGS WITH
GRILL PROVISION) Providing and Fixing of windows made of pre-painted steel (Base steel as per IS 513 of 0.6mm
thick galvanized as per IS 277 with Zinc of 120 GSM). Primer coated with epoxy primer of 5-7 microns thick, finish
painted with a polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd backer. Section for
outer frame should be of 48x50mm, centre mullion should be of 48x50mm, section for shutter should be of 47x20mm
and Fixed glass beading section should be of 12x12mm. Outer frame and mullions to have rebate for Glazed shutter
and a 20mm provision for Guard bars/Grills. The sections are to be cut to length metre joined with corner bracket.
Centre mullion is to be fixed with mullion cap. Seccolor Handle, seccolor stay, 2 nos. of Stainless Steel heavy duty
Pivot hinges shall be provided per shutter. The windows should be panelled with 5mm thick plain float glass. Rubber
Gaskets are provided all around the glass. The above frames should be fixed to the concrete/masonry wall by means
of self expanding screws, Including 10mm Square guard bars with 6” (152.4mm) pitch etc., complete for finished item
of work.
a Double shutter Window with vertical member 4’0” x 4’0” (1219.2mm x 1219.2mm) outer frame section size of
48x50mm shutter frame section size of 47x20mm and mullion section should be of 48x50mm.
Rate as per SSR Item No. 742 Pg 62 -BMT-P.25 1 Sqm #REF! 1 Sqm #REF!
over heads & contractors profit 14% #REF!
Sub-Total #REF!
VAT & Labour cess 0% #REF!
Rate per 1 Sqm Rs #REF!
b Centre fixed both side openable shutter window 5’0”x4’0” (1524mm x1219.2mm). Outer frame section size of
48x50mm. Shutter frame section size of 47x20mm. Mullion section size of 48x50mm. Fixed beading section size of
12x12mm.
Rate as per SSR Item No. 743 Pg 62 -BMT-P.26 1 Sqm #REF! 1 Sqm #REF!
over heads & contractors profit 14% #REF!
Sub-Total #REF!
VAT & Labour cess 0% #REF!
Rate per 1 Sqm Rs #REF!
44 Supplying and fixing of MS Grill for windows using 25mm x 6mm MS flat alround and 10mm MS square bars
horizontally at 125mm centre to centre and vertically at 30cm centre to centre including fixing with 4 Nos of MS Z
holdfasts (2 on each side) duly making cutting brick masonry, fixing and making to original surface neatly and
painting grill with one coat of red oxide primer including and conveyance of all materials ,cutting, bending, welding
including all operational charges and all labour charges etc., complete for finished item of work.
For MS Grill 1.50 x 1.50 = 2.25 Sqm
Quantity Anailysis
25mm x 6mm MS flat alround @ 1.20 Kg/Rmt
Vertical Flat 2 Nos 1.50 3.00
Horizontal Flat 2 Nos 1.50 3.00
Z Holdfasts 4 Nos 0.45 2.00
8.00 Rmt
8.00 Rmt 1.20 Kg/Rmt 9.60 Kgs
10mm M.S square bars @ 0.78 kg /Rmt
Vertical bars 5 Nos 1.50 8.00 Rmt
Horizontal bars 12 Nos 1.50 18.00 Rmt
26.00 Rmt
26.00 Rmt 0.78 Kg/Rmt 20.28 Kgs
29.88 Kgs
Cost Analysis
Cost of 25X 6mm MS Flat 9.60 Kgs 44.50 1 Kg 427.20
Cost of 10mm MS squre bars 20.28 Kgs 44.50 1 Kg 902.46
Labour charges for fabricating steel and fixing in 29.88 Kgs #REF! 1 Kg #REF!
positioncharges
Labour as per SSR ItemIron
for fixing No.BMM-V.14-824
Doors, Iron Windows 29.88 Kgs #REF! 1 Kg #REF!
and
M.A on Labour component @ BMM-V.15-825.Pg-
Window Grills in position- 20% #REF!
68 Rate per 29.88 Kgs Rs. #REF!
Rate per 1 Sqm #REF!
Rate per 1 Kg Rs. #REF!
447524687.xlsx - data-Road
45 BLD-CSTN-9-13-(111): Gronolithie Concrete Flooring 202191
Page 1694 of mm thick with (1:1:2), using 6mm to 12 mm size hard
granite machine crushed metal laid over CC bed already laid or RCC roof slab, in alternate panels of size not
exceeding 1.50 m x 1.50 m and finishing the top surface to required smoothness and slopes and thread lining
including cost of all materials like cement, metal, sand and water etc., complete, including seigniorage charges, etc.,
complete for finished item of work.
A. MATERIALS:
6mm to 12 mm H.G. Metal (Machine crushed) 0.17 Cum 1118.70 1 Cum 190.18
Cement 120.00 Kg 4.60 1 Kg 552.00
Sand 0.085 Cum 1303.00 1 Cum 110.76
B. LABOUR:
Mason 1st class 1.25 day 564.00 1 day 705.00
Mason 2nd class 0.06 day 540.00 1 day 32.40
Mazdoor (unskiled) 3.00 day 510.00 1 day 1530.00
Rs 3120.34
Add water charges 1% 1.00% 31.20
Total 3151.54
over heads & contractors profit 14% 441.22
Sub-Total 3592.76
Add Labour Cess @ 0% 0.00
Rate per 10 Sqm Rs 3592.76
46 BLD-CSTN-11-4- (161) : White washing one coat with whiting of approved quality to give an even shade after
thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all
materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but
excluding conveyance charges of materials
Whiting / White Cement - BMS-W.68 1.20 Kg #REF! 1 Kg #REF!
Gum, conjee water, or prickly pear juice including LS 10.00
necessary fire wood
Brick Layers / Painter 0.11 day 564.00 1 day 62.04
Mazdoor (unskilled) 0.22 day 510.00 1 day 112.20
#REF!
Sundries including brushes, ladders, etc., 0.50% #REF!
#REF!
over heads & contractors profit 14% #REF!
Sub-Total #REF!
Add Labour Cess @ 0% #REF!
Rate per 10 Sqm Rs #REF!
Rate per 1Sqm Rs #REF!
47 Manufacturing, supply and erection of 600 mm width ladders with 50X50X6 mm MS angles 2 nos verticals and
horizontals fixed at 25 cm c/c as per aprooved drawing and as directed by the departmental officers and painting
both sides with anti corrosive paint two coats over one coat of primary coat including cost of all materials fabrication,
welding transportation to site, all taxex and duties, fixing in position duly embodying in CC (1:1.5:3) prop., and all
other incidental and operational charges etc., complete for finished item of work.
Cost of ladder of 4.0 m
Weight of 50x50x6mm MS channels =(14.50 Rmt x 61.05 kg
4.42 kg/Rmt =
total 61.05 kg
Data for Summer Storage Tank & Waste Water Treatment Plant works
1 IRR-CAW-1-1: Excavation in all kinds of soil including boulders upto 0.3 m diameter for canal, seating of
embankment, filter drains / catch water drains etc., including dressing bed and sides to required level and profile,
cost of all materials, machinery, labour, placing the excavated soil neatly in dump area or for the formation of service
road / embankment as directed etc., complete with initial lead upto 1 km and all lifts.
Tippers 5 cum capacity 6 Nos ( S.N.55 - Hire- 48.00 Hour 1004.40 1 Hour 48211.20
Irrigation)
Total hire charges of Machinery 71954.40
C. LABOUR:
work inspector (S.No.10 - Labour- Skilled - 1.00 Day 678.00 1 Day 678.00
irrigation)
mazdoor (S.No.3 - Labour- Un Skilled - irrigation) 30.00 Day 510.00 1 Day 15300.00
2 IRR-CAW-1-2: Excavation in all kinds of soil including boulders upto 0.3 m diameter for canal, seating of
embankment, filter drains / catch water drains etc., including dressing bed and sides to required level and profile,
cost of all materials, machinery, labour, placing the excavated soil neatly in dump area or for the formation of service
road / embankment as directed etc., complete with initial lead upto 10m and lift up to 3m.
Unit 440 Cum
A. MATERIALS:
Nil 0.00
B. MACHINERY:
Shovel 0.50 cum capacity ( S.N.52 - Hire-Irrigation) 8.00 Hour 1804.40 1 Hour 14435.20
447524687.xlsx - data-Road
3 IRR-CAW-4-1: Providing impervious hearting embankment with soil collected in embankment area in heaps as part
Page 1697 of 2191
of disposal of excavated soil from canal including cost of all materials,machinery, labour, all operations such as
sortingout, spreading in layer of 25 cm before compaction, breaking clods,sectioning, watering and compacting each
layer to density control of not less than 98 percent or as stipulated by sheep's foot / pad foot roller etc., complete with
lead upto 1 km for water.
4 IRR-CAW-7-1: Providing cohesive non-swelling ( CNS ) soil lining to canals using soil from approved borrow area
including spreading soil in layers of thickness not more than 15 cm, breaking clods, watering, compacting to density
control of not less than 98 percent or as stipulated, dressing to required profile etc., complete with initial lead upto 1
km and all lifts.
Unit 394 Cum
A. MATERIALS:
Seioniorage charges for soil 394.00 Cum 22.00 1 Cum 8668.00
B. MACHINERY:
Shovel 0.50 cum capacity ( S.N.52 - Hire-Irrigation) 8.00 Hour 1804.40 1 Hour 14435.20
447524687.xlsx - data-Road
5 IRR-CAW-7-32: Providing and fixing LDPE sheetPage for1698
bed and sides of canal including cost of all materials, labour,
of 2191
laying, joining etc., complete with all leads and lifts. Using 1000 micron thick LDPE sheet.including providing average
75 mm thick unscreened sand backing to LDPE sheet.
6 IRR-CAW-7-30: Providing and fixing LDPE sheet for bed and sides of canal including cost of all materials, labour,
laying, joining etc., complete with all leads and lifts. Using 500 micron thick LDPE sheet.including providing average
75 mm thick unscreened sand backing to LDPE sheet.
Unit 250 Sqm
A. MATERIALS:
LDPE sheet 500 micron thick ,Sl.No-52, Pg-13 of 275.00 Sqm #REF! 1 Sqm #REF!
the SSR (2014-15)
Bitumen 85 / 25 and 80 / 100 Gr (HPCL Rate) 4.00 Kg 33.25 1 Kg 133.00
Sand unscreened ( S.No.1 of C-mat) 18.75 Cum 1303.00 1 Cum 24431.25
Total cost of Materials #REF!
B. MACHINERY:
Total hire charges of Machinery 0.00
C. LABOUR:
Joining & laying @ 10 % of sheet cost 10% #REF!
mazdoor for Sand Filling (S.No.3 - Labour- Un 6.00 Day 510.00 1 Day 3060.00
Skilled - irrigation)
mazdoor for Sheeting (S.No.3 - Labour- US - 1.00 Day 510.00 1 Day 510.00
irrigation)
Cost of Labour #REF!
Total of A+B+C #REF!
D. Add for contractor's profit and overheads on 14% #REF!
(A+B+C)
Total cost for 250 Sqm #REF!
Add VAT & LC @ 0% #REF!
#REF!
Rate per 1 Sqm #REF!
7 IRR-CAW-7-8 : Providing and laying 100 mm thick in situ M-15 (28 days cube compressive strength not less than
15 N /Sqmm ) grade cement concrete with 20 mm down size approved, clean, hard, graded aggregates for canal
lining using, vibrating, cylinder type mechanical paver including cost of all materials, machinery, labour, cleaning,
batching, mixing, placing in position, finishing, forming contraction joints, fixing PVC joint sealing strips, curing,
shifting of paver from one side to othere side of canal etc., complete with initial lead upto 1 Km and all lifts.
Mechanical paver ( S.N.24 - Hire-R&B -2013-14) 8.00 Hour 2518.88 1 Hour 20151.04
DG set for batching plant 50 KVA ( S.N.25 - Hire- 8.00 Hour 1431.80 1 Hour 11454.40
Irrigation)
DG set for paver 30 KVA ( S.N.24 - Hire-Irrigation) 8.00 Hour 1007.20 1 Hour 8057.60
Shovel 0.5 cum / Loader ( S.N.52 - Hire-Irrigation) 2.00 Hour 1804.40 1 Hour 3608.80
8 IRR-CAW-7-7: Providing and laying 80 mm thick in situ M-15 (28 days cube compressive strength not less than 15
N /Sqmm ) grade cement concrete with 20 mm down size approved, clean, hard, graded aggregates for canal lining
using, vibrating, cylinder type mechanical paver including cost of all materials, machinery, labour, cleaning, batching,
mixing, placing in position, finishing, forming contraction joints, fixing PVC joint sealing strips, curing, shifting of paver
from one side to othere side of canal etc., complete with initial lead upto 1 Km and all lifts.
Mechanical paver ( S.N.24 - Hire-R&B -2013-14) 8.00 Hour 2518.88 1 Hour 20151.04
DG set for batching plant 50 KVA ( S.N.25 - Hire- 8.00 Hour 1431.80 1 Hour 11454.40
Irrigation)
DG set for paver 30 KVA ( S.N.24 - Hire-Irrigation) 8.00 Hour 1007.20 1 Hour 8057.60
Shovel 0.5 cum / Loader ( S.N.52 - Hire-Irrigation) 2.00 Hour 1804.40 1 Hour 3608.80
447524687.xlsx - data-Road
Water tanker ( S.N.65 - Hire-Irrigation) 8.00 Hour
Page 1700 of 2191 961.90 1 Hour 7695.20
Pump 5 hp (diesel) 2 Nos. 4 hrs each ( S.N.27 - 8.00 Hour 232.20 1 Hour 1857.60
Hire-Irrigation)
B Total hire charges of Machinery 103709.44
Mason Class I (S.No.11 - Labour- Skilled - 2.00 Day 564.00 1 Day 1128.00
irrigation)
Mechanic (S.No.12 - Labour- Skilled - irrigation) 1.00 Day 600.00 1 Day 600.00
Fitter (S.No.6 - Labour- Skilled - irrigation) 1.00 Day 648.00 1 Day 648.00
Electrician (S.No.5 - Labour- Skilled - irrigation) 1.00 Day 648.00 1 Day 648.00
work inspector (S.No.10 - Labour- Skilled - 2.00 Day 678.00 1 Day 1356.00
irrigation)
mazdoor ( BP site ) (S.No.3 - Labour- US - 5.00 Day 510.00 1 Day 2550.00
irrigation)
mazdoor ( Paver site ) (S.No.3 - Labour- US - 10.00 Day 510.00 1 Day 5100.00
irrigation)
C Total cost of Labour 12030.00
Total of A+B+C Err:509
D. Add for contractor's profit and overheads on 14% Err:509
(A+B+C)
Total cost for 960 Sqm Err:509
Add VAT & LC @ 0% Err:509
Err:509
Rate per 1 Sqm Err:509
9 IRR-CAW-7-6: Providing and laying 75 mm thick in situ M-15 (28 days cube compressive strength not less than 15
N /Sqmm ) grade cement concrete with 20 mm down size approved, clean, hard, graded aggregates for canal lining
using, vibrating, cylinder type mechanical paver including cost of all materials, machinery, labour, cleaning, batching,
mixing, placing in position, finishing, forming contraction joints, fixing PVC joint sealing strips, curing, shifting of paver
from one side to othere side of canal etc., complete with initial lead upto 1 Km and all lifts.
Unit 960 Sqm
Cement 43 Gr ( CE-PH-Memo) 23760.00 Kg 4.60 1 Kg 109296.00
Coarse aggregate 20-10 mm (S.No.52 of C-Mat) 41.18 cum Err:509 1 cum Err:509
Coarse aggregate 10 to 4.75 mm (S.No.51 of C- 22.18 cum Err:509 1 cum Err:509
Mat)
Fine aggregate (Screened) (S.No.3 of C-Mat) 35.64 cum 1493.00 1 cum 53210.52
Super plasticiser -(S.n.70- Pg-14 - Irrigation SSR) 95.04 kg #REF! 1 kg #REF!
Mechanical paver ( S.N.24 - Hire-R&B -2013-14) 8.00 Hour 2518.88 1 Hour 20151.04
DG set for batching plant 50 KVA ( S.N.25 - Hire- 8.00 Hour 1431.80 1 Hour 11454.40
Irrigation)
DG set for paver 30 KVA ( S.N.24 - Hire-Irrigation) 8.00 Hour 1007.20 1 Hour 8057.60
Shovel 0.5 cum / Loader ( S.N.52 - Hire-Irrigation) 2.00 Hour 1804.40 1 Hour 3608.80
10 IRR-CAW-5-4: Providing and constructing dry rubble rock-toe using rubble and stone chips from approved source
including cost of all materials, machinery, labour, hand packing rubble and stone chips, finishing top and sides to
required slopes etc., complete with initial lead upto 50 m and all lifts.
Unit 100 Cum
Rubble (S.No.8 of C-Mat) 100.00 Cum 350.60 1 Cum 35060.00
Stone chips (S.No.5 of C-Mat) 15.00 cum 127.26 1 cum 1908.90
Sundries 2.00 30.00 1 0 60.00
A Total cost of Materials 37028.90
work inspector (S.No.10 - Labour- Skilled - Day 678.00 1 Day 678.00
irrigation) 1.00
Mason Class-II (S.No.35 - Labour- S.Skilled - 7.00 Day 540.00 1 Day 3780.00
irrigation)
mazdoor (S.No.3 - Labour- US - irrigation) 19.00 Day 510.00 1 Day 9690.00
B Total cost of Labour 14148.00
Total of A+B 51176.90
C. Add for contractor's profit and overheads on 14% 6967.73
(A+B)
Total cost for 100 Cum 58144.63
Add VAT & LC @ 0% 0.00
58144.63
Rate per 1 Cum 581.40
11 IRR-CAW-8-14: Providing 10 cm Thick approved type gross turfing to the side slopes of canal including cost of all
materials ,labour,watering for minimum 15 days etc.,,complete. with initial lead upto 50 m and all lifts ( WITHOUT
USING SAND)
Unit 100 Sqm
Turfing sods ( S.No.40- Pg.13 of 2014-15 SSR) 100.00 sqm #REF! 1 sqm #REF!
irrigation
Sand unscreened ( S.No.1 of C-mat) 0.00 cum 1303.00 1 cum 0.00
A Total cost of Materials #REF!
Cartman with double bullock cart (S.No.80 - Day 600.00 1 Day 1200.00
Labour- others(D) - R&B) 2.00
mazdoor (S.No.3 - Labour- US - irrigation) 7.00 Day 510.00 1 Day 3570.00
B Total cost of Labour 4770.00
Total of A+B #REF!
C. Add for contractor's profit and overheads on 14% #REF!
(A+B)
Total cost for 100 Sqm #REF!
Add VAT & LC @ 0% #REF!
#REF!
Rate per 1 Sqm #REF!
12 IRR-CAW-7-5 : Providing, fabricating and placing in position reinforcement steel bars for RCC works including
cleaning, straightening, cutting, bending, hooking, lapping, tying with 1.25 mm dia.soft annealed steel wire, welding
wherever required including cost of all materials, machinery,labour etc., complete with initial lead upto 50 and all lifts.
Unit 1000 Kg
Reinforcement .Steel with 5 % wastage ( CE-PH- 1050.00 kg Err:509 1 kg Err:509
Memo)
Binding wire 1.25 mm dia. S.No.3, Pg.11-2014-15 8.00 kg #REF! 1 kg #REF!
SSR
Sundries ( chairs / spacers etc ) 10.00 LS 30.00 300.00
A Total cost of Materials Err:509
Bar bender (S.No.1 - Labour- Skilled - irrigation) 6.00 Day 678.00 1 Day 4068.00
mazdoor (S.No.3 - Labour- US - irrigation) 11.00 Day 510.00 1 Day 5610.00
B Total cost of Labour 9678.00
Total of A+B Err:509
C. Add for contractor's profit and overheads on 14% Err:509
(A+B)
Total cost for 1000 Kg Err:509
Add VAT & LC @ 0% Err:509
447524687.xlsx - data-Road
Page 1702 of 2191 Err:509
Rate per 1 Kg Err:509
13 IRR-CAW-7-34: Providing and fixing 20 mm thick 100 mm depth tarfelt expansion joint filler boards for cement
concrete lining of canal including cost of all materials, labour etc., complete with all leads and lifts.
Unit 100 Rmt
Tarfelt joint filler board 20 mm thick,Sl.No.74,Pg.14- #REF! 1 Sqm #REF!
irri 10.00 Sqm
Total cost of Materials #REF!
Carpenter Cl- II (S.No.4 - Labour-SemiSkilled - 1.00 Day 540.00 1 Day 540.00
irrigation)
mazdoor (S.No.3 - Labour- US - irrigation) 1.00 Day 510.00 1 Day 510.00
Total cost of Labour 1050.00
Total of A+B #REF!
C. Add for contractor's profit and overheads on 14% #REF!
(A+B)
Total cost for 100 Rmt #REF!
Add VAT & LC @ 0% #REF!
#REF!
Rate per 1Rmt #REF!
14 IRR-CAW-7-36: Providing and forming 35 mm wide and 10 mm thick construction / contraction joints for concrete
lining by mastic filler including cost of all materials, labour etc., complete with all leads and lifts.
Unit 100 Rmt
Asphalt 80/100 Gr, - S.No.2, Pg.11-Irrigation 2014- 35.00 Kg #REF! 1 Kg #REF!
15
Sand ( screened ) (S.No.3 of C-Mat) 0.04 Cum 1493.00 1 Cum 59.72
A Total cost of Materials #REF!
Mason Class-II (S.No.35 - Labour- S.Skilled - 0.50 Day 540.00 1 Day 270.00
irrigation)
mazdoor (S.No.3 - Labour- US - irrigation) 1.00 Day 510.00 1 Day 510.00
B Total cost of Labour 780.00
Total of A+B #REF!
C. Add for contractor's profit and overheads on 14% #REF!
(A+B)
Total cost for 100 Rmt #REF!
Add VAT & LC @ 0% #REF!
#REF!
Rate per 1 Rmt #REF!
15 RBR-PTWK-12: (11) : Construction of toe walls for protection of slopes in PCC M -10 Grade as per drawing and
technical specifications Clause 1302.5 MORD
Unit 1 Cum
P.C.C grade M 10 - Machine Mixed
Nominal mix 1:3:6
(a) Material
Cement (CE-PH-memo) 0.220 t 4600.00 1t 1012.00
Coarse sand (S.No.2 of C-Mat) 0.45 cum 1303.00 1 cum 586.35
40 mm aggregate (S.No.57 of C-Mat) 0.570 cum Err:509 1 cum Err:509
20 mm aggregate (S.No.55 of C-Mat) 0.280 cum Err:509 1 cum Err:509
10 mm aggregate (S.No.53 of C-Mat) 0.050 cum Err:509 1 cum Err:509
(b) Labour
Mate - day
Mason(1st Class) (S.No.11 - Labour- Skilled - 0.10 day 564.00 1 day 56.40
irrigation)
Mazdoor (Unskilled) (S.No.3 - Labour- US - 1.39 day 510.00 1 day 708.90
irrigation)
(c) Machinery
Mechanical concrete mixer 0.4/0.28 cum capacity 0.40 hour 397.50 1 hour 159.00
fitted with water measuring device and preferably
also with load cell. ( S.N.17 - Hire-Irrigation)
Err:509
(d) Formwork @ 4% on cost of material, labour Err:509
and machinery (a+b+c)
Err:509
447524687.xlsx - data-Road
e&f) Overheads & Contractors Profit 14%
Page 1703 of 2191 Err:509
Rate per cum = a+b+c+d+e+f Err:509
Add VAT & LC @ 0% Err:509
Err:509
Rate per 1 Cum Err:509
16 Augoring and boring of holes in site for Bored cast-in-situ R.C.C. Piles for building foundations in loamy,
clayey soils like Black cotton soils and ordinary soils without under reams as per IS 2911 - 1980 as per approved
designs including all operations, incidental, labour charges, hire charges of machinery, augur bore drill and shell
equipment, etc, complete for all depths and for finished item of work for piles of following diameters -
17 Augoring and boring of holes in site for Bored cast-in-situ R.C.C. Piles for building foundations in loamy,
clayey soils like Black cotton soils and ordinary soils without under reams as per IS 2911 - 1980 as per approved
designs including all operations, incidental, labour charges, hire charges of machinery, augur bore drill and shell
equipment, etc, complete for all depths and for finished item of work for piles of following diameters -
18 BLD-CSTN-3-14-(31) - A ; Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using
WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from
approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement
content as per IS code fo FOUNDATIONS, PLINTH, PEDESTALS
447524687.xlsx - data-Road
Vibrator hire charges ( Hire - Irrigation-41) Page 1704 of1.333
2191 hour 205.00 1 hour 273.27
Water (including for curing) - M-189. irrigation. 1.20 Kl 98.00 1 Kl 117.60
Pg.34 Err:509
Add VAT @ 0% Err:509
BASIC COST per 1 cum Rs Err:509
c Plinth beams
M-20 -Grade of Mix 1.00 Cum Err:509 1 Cum Err:509
Centering charges ,Pg No.106 to 111 of Bld.SSR 1.00 Cum 1390.00 1 Cum 1390.00
Labour charges Pg No.106 to 111 of Bld.SSR 1.00 Cum 1521.00 1 Cum 1521.00
Add Labour component @ 20% 304.20
Sub - Total Err:509
Overheads & Contractors Profit 14% Err:509
Sub - Total Err:509
Add VAT @ 0% Err:509
Add Labour Cess @ 14% Err:509
Rate per One Cum Rs Err:509
19 BLD-CSTN-3-15- ( 31 ) -B : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using
WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from
approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement
content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS.
20 BLD-CSTN-3-7-(24) Using Concrete mixture all works up to Plinth Level ; Plain Cement concrete nominal mix
(1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage
charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top
surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:
Cement 129.60 Kg 4.60 1 Kg 596.16
Coarse aggregate 40mm graded 0.90 Cum Err:509 1 Cum Err:509
Fine aggregate (Sand) 0.45 Cum 1303.00 1 Cum 586.35
Water (including for curing) 1.20 Kl 98.00 1 Kl 117.60
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity 1 hour 397.50 1 hour 397.50
B. LABOUR:
Mason 1st class 0.10 day 564.00 1 day 56.40
Mazdoor (unskilled) 1.39 day 510.00 1 day 708.90
Sub - Total Rs Err:509
c.Overheads & Contractors Profit 14% Err:509
Add VAT @ 0% Err:509
Add Labour Cess @ 14% Err:509
Grand Total Err:509
Rate per One Cum Rs Err:509
21 BLD-CSTN-5-2 (40) : Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor
1:4 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of
Seigniorage charges on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift
charges , curing charges etc., complete for finished item of work
A. MATERIALS:
Cement 72.00 Kg 4.60 1 Kg 331.20
Ground moulded size 23x11x7 Cm - (1:4)
Bricks traditional size 23 x 11 x 7 cms 2nd class 512 Nos 5.70 1000 Nos 2.92
Fine aggregate (Sand) 0.20 Cum 1303.00 1 Cum 260.60
Sub Total of - A 594.72
B. LABOUR:
Mason 1st class 0.24 day. 564.00 1 day. 135.36
Mason 2nd class 0.56 day. 540.00 1 day. 302.40
Mazdoor (unskilled) 1.89 day. 510.00 1 day. 963.90
Sub Total of - B 1401.66
Total A+B Rs 1996.38
c.Overheads & Contractors Profit 14% 271.81
Add VAT @ 0% 0.00
Add Labour Cess @ 14% 271.81
Grand Total 2540.00
Rate per One Cum Rs 2540.00
22 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level: Plain Cement concrete nominal mix m-20
(Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage
charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top
surface to the required level curing etc., complete for finished item of work with nomonal reinforcement
Unit : 1cum
A. MATERIALS:
Cement 330.00 Kg 4.60 1 Kg 1518.00
Coarse aggregate 20mm graded 0.90 Cum Err:509 1 Cum Err:509
Fine aggregate (Sand) 0.45 Cum 1303.00 1 Cum 586.35
Water (including for curing) 1.20 Kl 98.00 1 Kl 117.60
447524687.xlsx - data-Road
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity Page 1706 of 21911 hour 397.50 1 hour 397.50
B. LABOUR:
Mason 1st class 0.10 day 564.00 1 day 56.40
Mazdoor (unskilled) 1.39 day 510.00 1 day 708.90
Sub - Total Rs Err:509
c.Overheads & Contractors Profit 14% Err:509
Add VAT @ 0% Err:509
Add Labour Cess @ 14% Err:509
Grand Total Err:509
Rate per One Cum Rs Err:509
23 BLD-CSTN-8-1-(76): Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and
conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all
operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for
finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:3) 0.15 Cum 3877.65 1 Cum 581.65
B. LABOUR:
Mason 1st class 0.60 day 564.00 1 day 338.40
Mazdoor (unskilled) 0.96 day 510.00 1 day 489.60
Total A+B Rs 1409.65
C.Overheads & Contractors Profit 14% 191.92
1601.57
Add VAT @ 0% 0.00
Rate per 10 Sqm Rs 1601.57
24 Supply and fixing of 40 mm thick polished black Kadapa stone for Baffle wall including labour charges for lifting and
fixing the stone in position at all levels:
Kadapa slab 40 mm thick and size not less than 1.05 Sqm #REF! 1 Sqm #REF!
0.457 M x 0.457 M (BMT-B.01) item 22 Pg.
Labour charges for lifting & fixing in position @ 20% #REF!
#REF!
over heads & contractors profit 14% #REF!
sub total #REF!
Add VAT @ 0% #REF!
Rate per 1 Sqm Rs #REF!
25 Carting of surplus excavated rock from the site to a distance suitable including loading, unloading charges, cost &
conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete.
a Rock/CC
Page No.328 of SSR, Conveyance rates - 5.00 Km 1 cum 57.10 1 Cum 57.10
VAT & Labour cess. 0% 0.00
Rate per 1 Cum Rs 57.10
b Earth
Page No.124 of SSR, Conveyance rates - 5.00 Km 1 cum 57.10 1 Cum 57.10
VAT & Labour cess. 0% 0.00
Rate per 1 Cum Rs 57.10
26 Bailing out water from the pipe line trenches with oil engine driven pump sets, including hire charges, fuel charges
and wages for Driver and Helper etc, complete,
Basic rate (item No.26/(a)/Pg 6 of PH SSR (PH 1 Hp.hr #REF! 1 Hp.hr #REF!
items)
Total Rs #REF!
Overheads & Contractors Profit 14% #REF!
VAT & Labour cess. 0% #REF!
Rate per 1HPhr Rs #REF!
447524687.xlsx - data-Road
24 RBR-FNDN-4-C-ii ; Providing concrete for plain/reinforced concrete in open foundations using 20 mm & 10mm
Page 1707 of 2191
nominal size/ Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration
including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
MORD and 1500, 1700 & 2100 MORTH.
Unit 1 Cum
R.C.C grade M 20 (Design Mix) using 20 mm
Graded Metal (MORTH)
CASE I : Using Concrete Mixer
Unit = cum
(a) Material
Cement 0.35 t 4600.00 1t 1596.20
Coarse sand 0.45 cum 1303.00 1 cum 586.35
20 mm aggregate 0.54 cum Err:509 1 cum Err:509
10 mm aggregate 0.36 cum Err:509 1 cum Err:509
(b) Labour
Mate - day
Mason (1st Class) 0.10 day 564.00 1 day 56.40
Mazdoor (Unskilled) 1.39 day 510.00 1 day 708.90
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity 0.40 hr/cum 397.50 1 hr/cum 159.00
Generator 33 KVA 0.40 hour 1007.20 1 hour 402.88
Err:509
(d) Formwork @ 4% on (a+b+c) - 4% Err:509
Err:509
e&f) Overheads & Contractors Profit 14% Err:509
Rate per cum = a+b+c+d+e+f Err:509
Add VAT @ 0% Err:509
Rate per 1 Cum Err:509
25 RBR-FNDN-4-C-ii : Providing concrete for plain/reinforced concrete in open foundations using 20 mm & 10mm
nominal size/ Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration
including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
MORD and 1500, 1700 & 2100 MORTH. ( With Form work)
Unit 1 Cum
R.C.C grade M 20 (Design Mix) using 20 mm
Graded Metal (MORTH)
CASE I : Using Concrete Mixer
Unit = cum
(a) Material
Cement 0.35 t 4600.00 1t 1596.20
Coarse sand 0.45 cum 1303.00 1 cum 586.35
20 mm aggregate 0.54 cum Err:509 1 cum Err:509
10 mm aggregate 0.36 cum Err:509 1 cum Err:509
(b) Labour
Mate - day
Mason (1st Class) 0.10 day 564.00 1 day 56.40
Mazdoor (Unskilled) 1.39 day 510.00 1 day 708.90
(c) Machinery 0.00
Concrete mixer 0.4/0.28 cum capacity 0.40 hr/cum 397.50 1 hr/cum 159.00
Generator 33 KVA 0.40 hour 1007.20 1 hour 402.88
Err:509
(d) Formwork @ 4% on (a+b+c) - 4% Err:509
Err:509
e&f) Overheads & Contractors Profit 14% Err:509
Rate per cum = a+b+c+d+e+f Err:509
Add VAT @ 0% Err:509
Add Labour Cess @ 0% Err:509
Rate per 1 Cum Err:509
447524687.xlsx - data-Road
26 Supply and placing of the Design Mix ConcretePage corresponding
1708 of 2191 to IS 456 using WEIGH BATCHER / MIXER with
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including
seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges
such as weigh batching, machine mixing, pouring concrete by tremmy, curing etc., complete but excluding cost of
steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS
code from standard suppliers approved by the department including tremmy pumping, laying concrete, curing etc.
complete but excluding cost of steel and its fabrication charges for finished item of work
BORED CAST-IN-SITU UNDER REAMED PILES including Bore pile stem and under ream bulbs
ANY GRADE OF MIX AND UP TO 700 mm dia
Unit : 1cum
A. MATERIALS:
Cement 0.40 MT 4600.00 1 MT 1840.00
20mm HBG graded metal 0.80 cum Err:509 1 cum Err:509
Sand 0.40 cum 1303.00 1 cum 521.20
Water (including for curing) 1.20 kl 98.00 1 kl 117.60
B. LABOUR:
1st Class Mason 0.10 hour 564.00 1 hour 56.40
2nd Class Mason 0.20 hour 540.00 1 hour 108.00
Mazdoor (Both Men & Women) 3.45 day 510.00 1 day 1759.50
C. MACHINERY
Weigh Batcher Hire charges (Machine mixing) 1.00 day 397.50 1 day 397.50
charges Err:509
e&f) Overheads & Contractors Profit 14% Err:509
Err:509
Add VAT @ 0% Err:509
Rate per 1 Err:509
27 Manufacture,supply and delivery of RCC Socket and Spigot Pipes confirming to B.I.S. 458/2003 ex-Factory, ( Rate
per Meter of effective length) including Transportation,Central Excice Duty, Sales Tax but Excluding VAT
etc.complete.
RCC NP2 S/S pipe - 300mm dia
Basic Rate of RCC NP2 S/S pipe as per Table - 3 1 Rmt 435.00 1 Rmt 435.00
P1
of SSR Pg No.21 (PH-SSR )
C1 SSR Rate of Cement / MT 1 MT 4600.00
C2 Market Rate of Cement / MT 1 MT 4600.00
Wc Cement required per 1 Rmt 10.80 Kg
R1 Variation in Cement Cost ( 4100-4000)/1000*3.6 0.00
S1 SSR Rate of MS rods / MT 1 MT 46000.00
S2 Market Rate of MS rods/ MT 1 MT 46000.00
Ws MS rods required per 1 Rmt 1.57 Kg 0.00
Variation in MS rods Cost ( 42500-
R2 41000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 ) 435.00
Total lead 10 Km
Rate up to 5 Kms Lead 4.00 4.00
Rate for every additional 1 KM lead or part thereof 0.12 0.60
28 Manufacture,supply and delivery of Rubber rings to suit RCC Socket and Spigot Pipes confirming to B.I.S. 5382/
1985 (RATE PER EACH RUBBER RING) including Transportation,Central Excice Duty, Sales Tax but Excluding VAT
etc.complete.
Rubber Ring to suit RCC NP2 S/S pipe - 300mm
dia
Basic Rate of RCC NP2 S/S pipe as per Table - 5 1 No 101.00 1 No 101.00
of SSR Pg No.23 (part - IV )
Add over heads 13.62% 13.75
Add CED @ 12.36% 0.00% 0.00
447524687.xlsx - data-Road
Add ST @ 5% 0.00%
Page 1709 of 2191 0.00
Cost of Each Rubber Ring 114.75
*
OBSERVED DATA FOR TESTING OF 450 MM DIA PSC MAIN : Pumping main to Hydralic field test pressure
including transportation of Water with minimum lead of 500 M
(Length = 500 Mts) taking out put / 500 Mts. Unit
= 1 Rmt.
Labour
Fitters (2 x 3 days)
Fitters I Class 3.000 day 564.00 1 day 1692.00
Fitters II Class 3.000 day 540.00 1 day 1620.00
Machinery
Hire chargers for Hydralic field test pressure testing 3.000 days 1200.00 1 days 3600.00
including transportation of water @ Rs. 1200/-
(1000+200) / day
Materials
Pressure guage 0.050 Nos 500.00 1 Nos 25.00
3/4" G.I. Pipe (20 mm) cost vide ( BMW-F.81 - BMW- 3.000 RM #REF! 1 RM #REF!
Specials 1 Ls 500.00 1 Ls 500.00
Dummies 0.100 No. 1500.00 1 Each 150.00
Diesel (2 Lts. / Hr) 30 Hrs.(item No.4 of Pg.22) 60.000 Lts. #REF! 1 Lts. #REF!
(T) Total Rate per 500 Mts. #REF!
(r) Rate per 1 Rmt for 450 mm dia #REF!
(R) Rate per 1 Rmt for 10 mm dia = (10/450) x r #REF!
28 Lowering the RCC S/S pipes carefully into ready made the trenches laying them true to alignment and gradient,
jointing with rubber rings and testing including filling with water with a water lead upto 500 meters including cost of
rubber rings as per BIS No. 783/1985
300 mm dia 300 mm dia
a) Labour
Mason 1st class 1.750 day 564.00 1 day 987.00
Mason 2nd class 4.140 day 540.00 1 day 2235.60
Man mazdoor 11.600 day 510.00 1 day 5916.00
Woman mazdoor(water carrier) 2.300 day 510.00 1 day 1173.00
10311.60
b) Material
Rubber rings conforming BIS 5382/1985-including 40.000 each 101.00 1 each 4040.00
CED & ST but excluding Contractors profit
c) Testing
Testing of Pipelines with required pressure as per 100.000 rm 1 rm 0.00
relevant IS Specification including filling with water
with a water lead upto 500 M, including hire
charges of testing equipment, labour and Materials
needed for testing (as per Sub Analysis 2 A)
Total cost for 300mm dia RCC NP2 class pipe including lowering, laying and jointing/ 1 Rmt 663.06
29 Providing pumping mains with the following DI pipes of K9 class as per ISI with spigot and socket ends, with all
necessary fittings as per IS 3114, including cost of DI pipes and specials and rubber rings, lowering, laying, jointing
and testing to required pressure including cost and conveyance of all materials to the site, labour charges etc., etc.
complete. ( Rates are inclusive of CP & OH )
a 100mm dia.DI K9 class (per Rmt)
Basic rate of DI pipe as per separate sheet 1 Rmt 1262.27 1 Rmt 1262.27
447524687.xlsx - data-Road
Cost of Rubber gasket ( Rate/5.00Rmt) 0.20 No
Page 1710 of 2191 105.91 1 No 21.18
Lowering Charges as per PH data 1 Rmt 28.24 1 Rmt 28.24
Jointing charges ( Rate/5.00 Rmt) 0.20 No 87.85 1 No 17.57
Total 1329.26
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt Rs 1329.26
447524687.xlsx - data-Road
VAT & Labour cess. 0%
Page 1711 of 2191 #REF!
Rate per 1 Rmt Rs #REF!
30 Providing road crossing pipes with R.C.C. NP 2 class socket and spigot pipes conforming to B.I.S. 458/1988
(rate for meter for effective length) including earth work excavation, Lowering the RCC pipes carefully into the
trenches, laying them true to the alignment and gradient, jointing with rubber rings and refilling the trenches with
excavated soils etc., including cost and conveyance of all material and all labour charges and all taxes like ,CED, ST
etc., but excluding VAT,
Dia of the Pipe 300 mm
Output 10.00 Rmt
cost of RCC Pipe as per data sheet 10.00 Rmt 498.83 1 Rmt 4988.30
Lowering and jointing charges 10.00 Rmt 164.23 1 Rmt 1642.30
6630.60
Sub Total 6630.60
Overheads & Contractors Profit 0.00% 0.00
Cost for 10.00 Rmt 6630.60
Rate per 1 Rmt 663.06
Rate per 1 Rmt Rs 663.06
31 Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with socket spigot ends confirming to
I.S.: 8329/2000 in standard working lengths of 4,5,5.5 & 6 meterfor classification K7/ K9 suitable for push on joint
( Rubber Gasket D jointing) with cement mortar lining inside the pipes with out side Zinc coating. Rates are including
Transportationand CED and ST etc,. complete.
DI K9 S/S pipe - 300mm dia P2 = P1+ (R2 - R1)/ 1000 x M x 0.96
Basic Rate of DI K9 S/S pipe as per Table - 22 (1) 1 Rmt 3561.00 1 Rmt 3561.00
P1
of SSR Pg No.101 (part - IV )
C1 SSR Rate of Pig Iron / MT 1 MT 35000.00
C2 Market Rate of Pig Iron / MT 1 MT 35000.00
Wc Weight of Pipe per 1 Rmt 54.18 Kg
Variation in Pig Iron Cost ( 27500- 0.00
R1 27500)/1000*13.27
Actual Rate of Pipe per Rmt (R1+R2 ) 3561.00
Total lead 150 Km
Rate for every 1 KM lead 0.66 99.00
Cost of pipe per 1 Rmt including transport 3660.00
Add over heads on pipe 13.62% 498.31
Add CED @ 12.36% 0.00% 0.00
Add ST @ 5% 0.00% 0.00
Cost of pipe per 1 Rmt 4158.31
447524687.xlsx - data-Road
32 Manufacture as per bis 12820/89 with S.B.R. quality
Page rubber confirming to BIS: 5382/85, supply and delivery of rubber
1712 of 2191
gaskets suitable for C.I/ D.I. S/S pipes anywhere in A.P. including cost of material, loading, incidental handling with
companys standard packing, transportation, unloading & stacking, central excise duty but excluding VAT etc.,
complete.
Rubber Gasket to suit 100mm DI S/S pipe
-100mm
Basic Rate diaas per Table - 24 of SSR Pg No.108 1 No 295.00 1 No 295.00
(part - IV )
Add over heads 14% 40.16
Add CED @ 12.36% 0.00% 0.00
Add ST @ 5% 0% 0.00
Cost of Each Rubber Ring 335.16
33 Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with socket spigot ends confirming to
I.S.: 8329/2000 in standard working lengths of 4,5,5.5 & 6 meterfor classification K7/ K9 suitable for push on joint
( Rubber Gasket D jointing) with cement mortar lining inside the pipes with out side Zinc coating. Rates are including
Transportationand CED and ST etc,. complete.
DI K9 S/S pipe - 350mm dia P2 = P1+ (R2 - R1)/ 1000 x M x 0.96
Basic Rate of DI K9 S/S pipe as per Table - 22 (1) 1 Rmt 4438.00 1 Rmt 4438.00
P1
of SSR Pg No.101 (part - IV )
C1 SSR Rate of Pig Iron / MT 1 MT 35000.00
C2 Market Rate of Pig Iron / MT 1 MT 35000.00
Wc Weight of Pipe per 1 Rmt 67.45 Kg
R1 Variation in Pig Iron Cost ( 29750- 0.00
29500)/1000*13.27
Actual Rate of Pipe per Rmt (R1+R2 ) 4438.00
Total lead 150 Km
Rate for every 1 KM lead 0.88 132.00
Cost of pipe per 1 Rmt including transport 4570.00
Add over heads on pipe 14% 622.21
Add CED @ 12.36% 0.00% 0.00
Add ST @ 5% 0% 0.00
Cost of pipe per 1 Rmt 5192.21
34 Manufacture as per bis 12820/89 with S.B.R. quality rubber confirming to BIS: 5382/85, supply and delivery of rubber
gaskets suitable for C.I/ D.I. S/S pipes anywhere in A.P. including cost of material, loading, incidental handling with
companys standard packing, transportation, unloading & stacking, central excise duty but excluding VAT etc.,
complete.
Rubber Gasket to suit 350mm DI S/S pipe
-350mm
Basic Rate diaas per Table - 24 of SSR Pg No.108 1 No 374.00 1 No 374.00
(part - IV )
Add over heads 14% 50.92
Add CED @ 12.36% 0.00% 0.00
Add ST @ 5% 0% 0.00
Cost of Each Rubber Ring 424.92
35 Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with socket spigot ends confirming to
I.S.: 8329/2000 in standard working lengths of 4,5,5.5 & 6 meterfor classification K7/ K9 suitable for push on joint
( Rubber Gasket D jointing) with cement mortar lining inside the pipes with out side Zinc coating. Rates are including
Transportationand CED and ST etc,. complete.
DI K9 S/S pipe - 400mm dia P2 = P1+ (R2 - R1)/ 1000 x M x 0.96
Basic Rate of DI K9 S/S pipe as per Table - 22 (1) 1 Rmt 5350.00 1 Rmt 5350.00
P1
of SSR Pg No.101 (part - IV )
C1 SSR Rate of Pig Iron / MT 1 MT 35000.00
C2 Market Rate of Pig Iron / MT 1 MT 35000.00
Wc Weight of Pipe per 1 Rmt 80.91 Kg
Variation in Pig Iron Cost ( 29750- 0.00
R1 29500)/1000*13.27
Actual Rate of Pipe per Rmt (R1+R2 ) 5350.00
Total lead 150 Km
Rate for every 1 KM lead 0.99 148.50
Cost of pipe per 1 Rmt including transport 5498.50
Add over heads on pipe 13.62% 748.62
Add CED @ 12.36% 0.00% 0.00
Add ST @ 5% 0.00% 0.00
447524687.xlsx - data-Road
Cost of pipe per 1 Rmt Page 1713 of 2191 6247.12
36 Manufacture as per bis 12820/89 with S.B.R. quality rubber confirming to BIS: 5382/85, supply and delivery of rubber
gaskets suitable for C.I/ D.I. S/S pipes anywhere in A.P. including cost of material, loading, incidental handling with
companys standard packing, transportation, unloading & stacking, central excise duty but excluding VAT etc.,
complete.
Rubber Gasket to suit 400mm DI S/S pipe
Basic Rate as per Table - 24 of SSR Pg No.108 1 No 408.00 1 No 408.00
(part - IV )
Add over heads 14% 55.55
Add CED @ 12.36% 0% 0.00
Add ST @ 5% 0% 0.00
Cost of Each Rubber Ring 463.55
37 Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with socket spigot ends confirming to
I.S.: 8329/2000 in standard working lengths of 4,5,5.5 & 6 meterfor classification K7/ K9 suitable for push on joint
( Rubber Gasket D jointing) with cement mortar lining inside the pipes with out side Zinc coating. Rates are including
Transportationand CED and ST etc,. complete.
DI K9 S/S pipe - 450mm dia P2 = P1+ (R2 - R1)/ 1000 x M x 0.96
Basic Rate of DI K9 S/S pipe as per Table - 22 (1) 1 Rmt 6401.00 1 Rmt 6401.00
P1 of SSR Pg No.101 (part - IV )
C1 SSR Rate of Pig Iron / MT 1 MT 35000.00
C2 Market Rate of Pig Iron / MT 1 MT 35000.00
Wc Weight of Pipe per 1 Rmt 96.36 Kg
Variation in Pig Iron Cost ( 29750- 0.00
R1
29500)/1000*13.27
Actual Rate of Pipe per Rmt (R1+R2 ) 6401.00
Total lead 150 Km
Rate for every 1 KM lead 1.21 181.50
Cost of pipe per 1 Rmt including transport 6582.50
Add over heads on pipe 14% 896.21
Add CED @ 12.36% 0.00% 0.00
Add ST @ 5% 0% 0.00
Cost of pipe per 1 Rmt 7478.71
38 Manufacture as per bis 12820/89 with S.B.R. quality rubber confirming to BIS: 5382/85, supply and delivery of rubber
gaskets suitable for C.I/ D.I. S/S pipes anywhere in A.P. including cost of material, loading, incidental handling with
companys standard packing, transportation, unloading & stacking, central excise duty but excluding VAT etc.,
complete.
Rubber Gasket to suit 450mm DI S/S pipe
Basic Rate as per Table - 24 of SSR Pg No.108 1 No 439.00 1 No 439.00
(part - IV )
Add over heads 14% 59.77
Add CED @ 12.36% 0.00% 0.00
Add ST @ 5% 0% 0.00
Cost of Each Rubber Ring 498.77
39 Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with socket spigot ends confirming to
I.S.: 8329/2000 in standard working lengths of 4,5,5.5 & 6 meterfor classification K7/ K9 suitable for push on joint
( Rubber Gasket D jointing) with cement mortar lining inside the pipes with out side Zinc coating. Rates are including
Transportationand CED and ST etc,. complete.
DI K9 S/S pipe - 500mm dia P2 = P1+ (R2 - R1)/ 1000 x M x 0.96
Basic Rate of DI K9 S/S pipe as per Table - 22 (1) 1 Rmt 7447.00 1 Rmt 7447.00
P1
of SSR Pg No.101 (part - IV )
C1 SSR Rate of Pig Iron / MT 1 MT 35000.00
C2 Market Rate of Pig Iron / MT 1 MT 35000.00
Wc Weight of Pipe per 1 Rmt 112.00 Kg
R1 Variation in Pig Iron Cost ( 29750- 0.00
29500)/1000*13.27
Actual Rate of Pipe per Rmt (R1+R2 ) 7447.00
Total lead 150 Km
Rate for every 1 KM lead 1.43 214.50
Cost of pipe per 1 Rmt including transport 7661.50
447524687.xlsx - data-Road
Add over heads on pipe 14%
Page 1714 of 2191 1043.11
Add CED @ 12.36% 0.00% 0.00
Add ST @ 5% 0% 0.00
Cost of pipe per 1 Rmt 8704.61
40 Manufacture as per bis 12820/89 with S.B.R. quality rubber confirming to BIS: 5382/85, supply and delivery of rubber
gaskets suitable for C.I/ D.I. S/S pipes anywhere in A.P. including cost of material, loading, incidental handling with
companys standard packing, transportation, unloading & stacking, central excise duty but excluding VAT etc.,
complete.
Rubber Gasket to suit 500mm DI S/S pipe
Basic Rate as per Table - 24 of SSR Pg No.108 1 No 609.00 1 No 609.00
(part - IV )
Add over heads 14% 82.92
Add CED @ 12.36% 0.00% 0.00
Add ST @ 5% 0% 0.00
Cost of Each Rubber Ring 691.92
Sub Analysis
*
Lowering C.I. Pipes, A class and specials with s/s
ends carefully into trench and laying them true to
alignment and gradient including all sundries but
excluding cost and conveyance of pipes from
source of supply. (Reference to specifications. BIS
No.3114/94)
Assumtion 10 m
200 mm dia CI pipes 5m long (class ‘A’)
Weight = 2 x 257 kgs = 514 kgs = 5.14 quintal
(a) LABOUR: (including LC)
Plumber 1st class 0.102 day 648.00 1 day 66.10
Plumber 2nd class 0.238 day 540.00 1 day 128.52
Man mazdoor 1.330 day 510.00 1 day 678.30
(b) Cost for 10 metres 872.92
Rate per metre = b/10 87.29
Rate for 1 kg = b/514 1.700
41 PHE-LCIS-1 : Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with s/s ends carefully into trenches
and laying them true to alignment and gradient including all sundries but excluding cost and conveyance of pipes
from source of supply (Ref to specifications. BIS No.3114/1994)
Note : The Labour charges for cost of Lowering & Laying per 1 kg weight shall be as per sub-analysis made for 200
mm dia CI Pipes S/s ends.
Details of cost for 5m
*
OBSERVED DATA FOR TESTING OF 450 MM DIA PSC MAIN : Pumping main to Hydralic field test pressure
including transportation of Water with minimum lead of 500 M
(Length = 500 Mts) taking out put / 500 Mts. Unit = 1 Rmt.
Labour : ( including LC)
Fitters (2 x 3 days)
Fitters I Class ( Labour-Skilled- Irrigation-Sn.6) 3.000 day 648.00 1 day 1944.00
Fitters II Class 3.000 day 540.00 1 day 1620.00
Machinery
Hire chargers for Hydralic field test pressure testing 3.000 days 1200.00 1 days 3600.00
including transportation of water @ Rs. 1200/-
(1000+200) / day
Materials
Pressure guage 0.050 Nos 500.00 1 Nos 25.00
3/4" G.I. Pipe (20 mm) (168-33.00) 3.000 RM #REF! 1 RM #REF!
Specials 1 Ls 500.00 1 Ls 500.00
Dummies 0.100 No. 1500.00 1 Each 150.00
Diesel (2 Lts. / Hr) 30 Hrs.(item No.4 of Pg.22) 60.000 Lts. #REF! 1 Lts. #REF!
(T) Total Rate per 500 Mts. #REF!
(r) Rate per 1 Rmt for 450 mm dia #REF!
(R) Rate per 1 Rmt for 10 mm dia = (10/450) x r #REF!
Note : Proportionate Testing Charges may be arrived, keeping the diametre of pipe based on this analysis, for an
varities of pipes for various Dia Pipes.
42 PHE-JCIR-4 : Jointing C.I., D.I. pipes and fittings with rubber gasket (push-on-joint), excluding the cost of the
gasket but including all sundries filling with water, with a water lead up to 500m and testing to required pressure, etc.
complete Reference to specifications IS 3114/1994/12888/1987
Note : Rubber Gaskets shall be added seperately.
447524687.xlsx - data-Road
(g) Overheads & Contractors Profit 14%
Page 1717 of 2191 #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!
43 Centrifugally cast (spun) Ductile Iron fittings conforming to IS:9523/2000 having dimentions as per table. the rates
mentioned here under are for fittings, Zinc coated externally with inside mortar lining (with finishing as per class 13/
IS 9523/2000) ( ex-works) including transportation, taxes and duties etc.
3 Cutting open water bound macadam road including soiling and stacking of excavated materials for pipe line trench
work. as directed by the departmental officers.
Rate as per PH-SSR item no 25 c,Pg.6 1 Cum #REF! 1 Cum #REF!
Add for Municipal Allowance at 20% #REF!
Overheads & Contractors Profit 14% #REF!
447524687.xlsx - data-Road
Total Page 1719 of 2191 #REF!
Add Sundries #REF!
Rate per 1 Cum Rs #REF!
Add VAT & Labour cess etc. @ 0% #REF!
Rate per 1 Cum #REF!
4 RBR-FNDN-1- (I-A-i) In ordinary soils, by Manual means: Earthwork excavation in all kinds of soil for Pipe line
trenches as per drawings and technical specifications including setting out, construction of shoring and bracing,
removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 304
MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is
possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water
lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of
remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Lines
by manual means.
Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD and 301.2.1 of MORT&H
I-A In ordinary soils, by Manual means for Pipe line Trenches
i up to 3.00 Mts depth below GL out put 10.00 Cum
a) Labour
Mate ( Labour- R&B-S.N.71) 0 Nos. 540.00 1 Each 0.00
Mazdoor (Unskilled) ( Labour-Irrigation-Unskilled- 3.64 Nos. 510.00 1 Each 1856.40
S.N.3) 1856.40
c&d) Overheads & Contractors Profit @ 14% 252.75
add extra for pipe line trenches @ 75% 1392.3
Cost for 240 cum = a+b+c+d 3501.45
Rate per cum = (a+b+c+d)/10 350.15
Rate per 1 Cum excluding Dewatering Rs 350.15
Add VAT & Labour cess etc. @ 0% 0.00
Rate per 1 Cum excluding Dewatering 350.15
5 RBR-FNDN-1- (I-B-i) - In ordinary soils, by Mechanical means : Earthwork excavation in all kinds of soil for
Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and
bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical
Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility
services wherever it is possible during the execution and taking all precautionary measures in the restricted areas
for laying sewer/water lines including divertion of traffic and backfilling in trenches with excavated suitable material
and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete
for Pipe Lines by mechanical means.
I-B In ordinary soils by Mechanical means for Pipe line trenches
i up to 3.00 Mts depth below GL out put 240.0 Cum
a) Labour
Mate ( Labour- R&B-S.N.71) 0 Nos. 540.00 1 Each 0.00
Mazdoor (Unskilled) ( Labour-Irrigation-Unskilled- 8.32 Nos. 510.00 1 Each 4243.20
S.N.3)
b) Machinery
Hydraulic Excavator 1 cum bucket capacity ( R& B 6.00 hours 2967.90 1 hours 17807.40
SSR Hire charges, item No.4)
Sub total 22050.60
c&d) Overheads & Contractors Profit 14% 3087.08
Cost for 240 cum = a+b+c+d 25137.68
Rate per cum = (a+b+c+d)/240 104.74
Rate per 1 Cum excluding Dewatering Rs 104.74
Add VAT & Labour cess etc. @ 0% 0.00
Rate per 1 Cum excluding Dewatering 104.74
Note: The cost of shoring and shuttering, where needed, may be added on cost of excavation for open foundation.
447524687.xlsx - data-Road
6 RBR-FNDN-1- (ii-A) - In ordinary soils, by Manual Page 1720means
of 2191 : Earthwork excavation in all kinds of soil for Pipe
line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing,
removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 304
MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is
possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water
lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of
remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Lines
by Manual means- from 3.00m to 6.00m below ground Level.
i RBR-FNDN--ii-A- 3.00 Mts to 6.00 Mts depth below GL out put 10.00 Cum
a) Labour
Mate ( Labour- R&B-S.N.71) 0 Nos. 540.00 1 Each 0.00
Mazdoor (Unskilled) ( Labour-Irrigation-Unskilled- 4.68 Nos. 510.00 1 Each 2386.80
S.N.3) 2386.80
c&d) Overheads & Contractors Profit @ 14% 334.15
add extra for pipe line trenches @ 75% 1790.1
Cost for 240 cum = a+b+c+d 4511.05
Rate per cum = (a+b+c+d)/10 451.11
Rate per 1 Cum excluding Dewatering Rs 451.11
Add VAT & Labour cess etc. @ 0% 0.00
Rate per 1 Cum excluding Dewatering 451.11
7 RBR-FNDN-1- (ii-A) - In ordinary soils, by Mechanical means : Earthwork excavation in all kinds of soil for
Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and
bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical
Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility
services wherever it is possible during the execution and taking all precautionary measures in the restricted areas
for laying sewer/water lines including divertion of traffic and backfilling in trenches with excavated suitable material
and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete
for Pipe Lines by mechanical means - from 3.00m to 6.00m below ground Level.
ii RBR-FNDN--ii-B- 3.00 Mts to 6.00 Mts depth below GL out put 210.0 Cum
a) Labour
Mate ( Labour- R&B-S.N.71) 0 Nos. 540.00 1 Each 0.00
Mazdoor (Unskilled) ( Labour-Irrigation-Unskilled- 8.32 Nos. 510.00 1 Each 4243.20
S.N.3)
b) Machinery
Hydraulic Excavator 1 cum bucket capacity 6 hours 2967.90 1 hours 17807.40
Sub total 22050.60
c&d) Overheads & Contractors Profit 3087.08
Cost for 240 cum = a+b+c+d 25137.68
Rate per cum = (a+b+c+d)/240 119.7
Rate per 1 Cum excluding Dewatering Rs 119.70
Add VAT & Labour cess etc. @ 0% 0.00
Rate per 1 Cum excluding Dewatering 119.70
RBR-FNDN-B-iii- above 6.00 Mts depth below
iii out put 180.0 Cum
GL
a) Labour
Mate 0 Nos. 540.00 1 Each 0.00
Mazdoor (Unskilled) 10.40 Nos. 510.00 1 Each 5304.00
b) Machinery
Hydraulic Excavator 1 cum bucket capacity 6 hours 2967.90 1 hours 17807.40
Sub total 23111.40
c&d) Overheads & Contractors Profit 3235.6
Cost for 240 cum = a+b+c+d 26347.00
Rate per cum = (a+b+c+d)/240 146.37
Rate per 1 Cum excluding Dewatering Rs 146.37
Add VAT & Labour cess etc. @ 0% 0.00
Rate per 1 Cum excluding Dewatering 146.37
447524687.xlsx - data-Road
8 RBR-FNDN-1- (iii) - In hard rock require blasting: Excavation
Page 1721 of 2191 in rocky soils by Machine require blasting :
Earthwork excavation in hard rock such as sheet rock and boulders required blasting for pipe line trenches
including, cost of blasting materials, duly taking all precautionary measures including all incidental and operational
charges etc., complete.
Upto 3 m depth including 1.5 m depth in hard rock out put 10.00 Cum
Unit = cum
Taking output = 10 cum
a) Labour
Mate ( Labour- R&B-S.N.71) 0.00 Nos 540.00
Driller (labour R&B- S.N.31) 0.50 Nos 660.00 1 Nos 330.00
Blaster (labour -Irrigation-Skilled- S.N.3) 0.25 Nos 678.00 1 Nos 169.50
Mazdoor (Unskilled) ( Labour-Irrigation-Unskilled- 8.35 Nos 510.00 1 Nos 4258.50
S.N.3)
b) Machinery
Air compressor 210 cfm / 250 cfm with 2 jack 1 hour 1358.70 1 hour 1358.70
hammers ( Hire charges- Irrigation-S.N.3)
c) Materials
Gelatin 80 per cent -( M-104 -Irrigation SSR ), 3.50 No #REF! 1 No #REF!
pg.30
Electric Detonators @ 1 detonator for 2 gelatine 14.00 Nos #REF! 100 Nos #REF!
sticks of 285 gm each -(M-094 -Irrigation SSR)
Sub total #REF!
d) Overheads & Contractors Profit 14% #REF!
Cost for 10 cum = a+b+c+d #REF!
Cost for 1 cum #REF!
Rate per 1 Cum excluding Dewatering Rs #REF!
Add VAT & Labour cess etc. @ 0% #REF!
Rate per 1 Cum excluding Dewatering #REF!
Note : 1. Cost of dewatering @ 5 per cent of (a+b) may be added, where required as per site
condition.
2. No limitation of depth in MORTH
9 RBR-FNDN-1- (iv) - In hard rock blasting prohibited: Excavation in Hard rock (blasting prohibited) Upto 3 m
depth including 1.5 m depth in hard rock : Earthwork excavation in hard rock such as sheet rock and boulders in
habitant areas where conventional blasting can not be done for pipe line trenches, including all incidental and
operational charges etc., complete.
out put 10.00 Cum
a) Labour
Mate 0.00 Nos 540.00 1 Nos 0.00
Mazdoor (Unskilled) 5.20 Nos 510.00 1 Nos 2652.00
b) Machinery
Air compressor 210 cfm / 250 cfm with 2 jack 6.00 hour 1358.70 1 hour 8152.20
hammers of pneumatic breaker at 1 cum per hour
sub total ; a+b 10804.20
c&d) Overheads & Contractors Profit 14% 1512.59
Cost for 10 cum = a+b+c+d 12316.79
Rate per cum = a+b+c+d+e)/10 1231.68
Rate per 1 Cum excluding Dewatering 1231.68
Add VAT & Labour cess etc. @ 0% 0.00
Rate per 1 Cum excluding Dewatering 1231.68
10 RBR-FNDN-1 -manual means : Earthwork excavation for structures in all types of soil as per drawing and technical
specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious
material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated
suitable material as per Technical Specification 305 MORD / 304 MORTH. for Sumps,Thrust blocks, Chambers
and Man Holes etc. by manual means,
Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD and 301.2.1 of MORT&H
Ordinary Soils : for Sumps, Thrust Blocks and Man Holes etc,.
up to 3.00 Mts depth below GL out put 10.00 Cum
a) Labour
Mate 0 Nos. 540.00 1 Each 0.00
Mazdoor (Unskilled) 3.64 Nos. 510.00 1 Each 1856.40
447524687.xlsx - data-Road
Sub total Page 1722 of 2191 1856.40
c&d) Overheads & Contractors Profit 14% 259.9
Cost for 240 cum = a+b+c+d 2116.30
Rate per cum = (a+b+c+d)/10 211.63
Rate per 1 Cum excluding Dewatering Rs 211.63
Add VAT & Labour cess etc. @ 0% 0.00
Rate per 1 Cum excluding Dewatering 211.63
11 Carting of surplus excavated rock from the site to a suitable distance including loading, unloading charges, cost &
conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete.
a Rock/CC
Page No.328 of SSR, Conveyance rates - 5.00 Km 1 cu.m. 57.10 1 Cum 57.10
Add Sundries 0.00
Rate per 1 Cum Rs 57.10
Add VAT & Labour cess etc. @ 0% 0.00
Rate per 1 Cum 57.10
b Earth
Page No.124 of SSR, Conveyance rates - 5.00 Km 1 cu.m. 57.10 1 Cum 57.10
Add Sundries 0.00
Rate per 1 Cum Rs 57.10
Add VAT & Labour cess etc. @ 0% 0.00
Rate per 1 Cum 57.10
12 RBR-FNDN-2 : Collection, Supply and filling of Sand from approved quarry to work site and stacking at work site to
Dept. gauge for premeasurements including cost and convenyance of all material and all labour charges etc.
complete as per standard specifications. Clause 305.3.9 MORD & 304 MORTH
a) Labour
Mate 0.00 Nos 540.00 1 Nos 0.00
Mazdoor (Unskilled) 0.31 Nos 510.00 1 Nos 158.10
b) Material
Sand (C-Mat-Lead statement-S.No.1) 6.00 Cum 1303.00 1 Cum 7818.00
Sub total a+b 7976.10
c&d) Overheads & Contractors Profit 14% 1116.65
Rate per cum = a+b+c+d 9092.75
Rate per 6 Cum 9092.75
Rate per 1 Cum 1515.46
Add VAT & Labour cess etc. @ 0% 0.00
Rate per 1 Cum 1515.46
13 RBR-FNDN-2: Collection ,Supply and filling of Stone dust from approved quarry to work site and stacking at work
site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour charges etc.
complete as per standard specifications. Clause 305.3.9 MORD & 304 MORTH
Stone dust Filling out put 6.00 Cum
a) Material
Stone dust Filling (C-Mat-Lead statement-S.No.23) 6.00 Cum 618.70 1 Cum 3712.20
b) Labour
Mate ( Labour- R&B-S.N.71) 0.00 Nos 540.00 1 Nos 0.00
Mazdoor (Unskilled) ( Labour-Irrigation-Unskilled- 0.31 Nos 510.00 1 Nos 158.10
S.N.3)
Sub Total 3870.30
b&c) Overheads & Contractors Profit 14% 526.94
Cost for 6 cum = a+b+c 4397.24
Rate per cum = (a+b+c)/6 732.87
VAT & Labour cess. 0% 0.00
Rate per 1 Cum 732.87
14 Supply and delivery of Salt Glazed Pipes of ISI make conforming to ISI 651 including cost and conveyance of
pipes i.e laoding at factory, transporation, unloading at site and stacking etc, complete
Cost of the pipes as per Pg. 114 of Sanitary and water supply section BSSR 2013-14
a 150mm dia SWG - SP-1
447524687.xlsx - data-Road
Supply of SWG SP-1 pipe conforming to ISI 651 -Page 1723 of 21911 Rmt #REF! 1 Rmt #REF!
6" dia (152.4mm) BMW-A.16/Pg-114
c&d) Overheads & Contractors Profit 14% #REF!
Total Rs. Per 1 Rmt #REF!
Add VAT & Labour cess etc. @ 0% #REF!
Rate per 1 Rmt #REF!
15 PHE - LJSW-13: Lowering and laying in ready made trench true to alignment and gradient, jointing, and testing of
stone ware pipes including cost of jointing material such as cement mortar (1:1) proportion and hemp yarn but
excluding cost and conveyance of pipe. (Reference to specifications BIS No. 6530/72)
Detail cost for 30 meters
447524687.xlsx - data-Road
SWG -SP-1,2 &3 Pipes Page 1724 of 2191
a 150 mm dia - SWG
(a) Labour
Mason 1st class(labour-Irrigation.S.N.11) 0.900 day 564.00 1 day 507.60
2nd Class Mason (labour-Irrin-Semi Skilled. Sn.35) 2.100 day 540.00 1 day 1134.00
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled- 4.000 day 510.00 1 day 2040.00
S.N.4) 1.000 day 510.00 1 day 510.00
b) Material 4191.60
150 mm dia SW pipe 60cm long 50.000 each 0.00
Cement for 50 joints =0.045 cum 0.097 t 4.60 1t 0.45
Sand = 0.045 cum ( C-Mat-Sn.3- sand for Mortar)
Spun yarn = 0.09x50=4.50 (Table -31 -S.No.3) Pg- 0.068 cum 1493.00 1 cum 101.52
82 9.000 kgs 128.00 1 kgs 1152.00
(c) Total
(d) Add =fora+b
water charges @ 1% on Labour & 5445.57
Testing Charges 41.92
(e) Total = c+d 5487.49
(f) Overheads & Contractors Profit 14% 747.12
(g) Cost for 30 m (e+f) 6234.61
Rate per metre = g/30 207.82
Rate per 1 RM 207.85
Add VAT & Labour cess etc. @ 0% 0.00
Rate per 1 Rmt 207.85
16 Manufacture,supply and delivery of RCC Socket and Spigot Pipes confirming to B.I.S. 458/2003 ex-Factory, ( Rate
per Meter of effective length) including Transportation, Central Excice Duty, Sales Tax etc.complete.
a RCC NP3 S/S pipe - 300mm dia
P1 Basic Rate of RCC NP3 S/S pipe as per Table - 3 1 Rmt 1049.00 1 Rmt 1049.00
C1 of
SSRSSR
Rate of Cement / MT 1 MT 4600.00
C2 Market Rate of Cement / MT 1 MT 4600.00
Wc Cement required per 1 Rmt 14.40 Kg
R1 Variation in Cement Cost ( 4000-5600)/1000*3.6 0.00
S1 SSR Rate of MS rods / MT 1 MT 46000.00
S2 Market Rate of MS rods/ MT 1 MT 46000.00
447524687.xlsx - data-Road
Ws MS rods required per 1 Rmt 3.03 Kg
Page 1727 of 2191 0.00
R2 Variation in MS rods Cost ( 41000-
43000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 ) 1049.00
Total lead 10 Km
Rate up to 5 Kms Lead 46.00 46.00
Rate for every additional 1 KM lead or part thereof 1.45 7.25
Cost of pipe per 1 Rmt including transport 1102.25
Add over heads & CP on pipe 14% 150.07
Add CED @ 12.36% 0.00% 0.00
Add ST @ 5% 0.00% 0.00
Cost of pipe per 1 Rmt 1252.32
Add VAT & Labour cess etc. @ 0% 0.00
Cost of pipe per 1 Rmt 1252.32
447524687.xlsx - data-Road
C2 Market Rate of Cement / MT Page 1731 of 21911 MT 4600.00
Wc Cement required per 1 Rmt 64.80 Kg
R1 Variation in Cement Cost ( 4000-5600)/1000*3.6 0.00
S1 SSR Rate of MS rods / MT 1 MT 46000.00
S2 Market Rate of MS rods/ MT 1 MT 46000.00
Ws MS rods required per 1 Rmt 9.19 Kg 0.00
R2 Variation in MS rods Cost ( 41000-
43000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 ) 2695.00
Total lead 10 Km
Rate up to 5 Kms Lead 101.00 101.00
Rate for every additional 1 KM lead or part thereof 4.84 24.20
Cost of pipe per 1 Rmt including transport 2820.20
Add over heads & CP on pipe 14.00% 394.83
Add CED @ 12.36% 12.36% 333.10
Add ST @ 5% 5.00% 134.75
Cost of pipe per 1 Rmt 3682.88
Add VAT & Labour cess etc. @ 0% 0.00
Cost of pipe per 1 Rmt 3682.88
17 Manufacture,supply and delivery of Rubber rings to suit RCC Socket and Spigot Pipes confirming to B.I.S. 5382/
1985 (RATE PER EACH RUBBER RING) including Transportation,Central Excice Duty, Sales Tax but Excluding VAT
etc.complete.
A Dia of the Rubber Ring Basic CED @ ST @ Sub- OH& CP Total
Cost Total @
12.36% 5% 14%
RCC NP2 S/S pipe - 80mm dia 26.00 3.21 1.30 30.51 3.64 34.15
RCC NP2 S/S pipe - 100mm dia 32.00 3.96 1.60 37.56 4.48 42.04
RCC NP2 S/S pipe - 150mm dia 57.00 7.05 2.85 66.90 7.98 74.88
RCC NP2 S/S pipe - 200mm dia 67.00 8.28 3.35 78.63 9.38 88.01
RCC NP2 S/S pipe - 225mm dia 74.00 9.15 3.70 86.85 10.36 97.21
RCC NP2 S/S pipe - 250mm dia 83.00 10.26 4.15 97.41 11.62 109.03
RCC NP2 S/S pipe - 300mm dia 101.00 12.48 5.05 118.53 14.14 132.67
RCC NP2 S/S pipe - 350mm dia 117.00 14.46 5.85 137.31 16.38 153.69
RCC NP2 S/S pipe - 400mm dia 129.00 15.94 6.45 151.39 18.06 169.45
RCC NP2 S/S pipe - 450mm dia 146.00 18.05 7.30 171.35 20.44 191.79
RCC NP2 S/S pipe - 500mm dia 191.00 23.61 9.55 224.16 26.74 250.90
RCC NP2 S/S pipe - 600mm dia 251.00 31.02 12.55 294.57 35.14 329.71
RCC NP2 S/S pipe - 700mm dia 341.00 42.15 17.05 400.20 47.74 447.94
RCC NP2 S/S pipe - 800mm dia 433.00 53.52 21.65 508.17 60.62 568.79
B Dia of the Rubber Ring Basic Cost CED @ ST @ Sub- OH& CP Total
Total @
12.36% 5% 14%
RCC NP3 S/S pipe - 300mm dia 130.00 16.07 6.50 152.57 18.20 170.77
RCC NP3 S/S pipe - 350mm dia 155.00 19.16 7.75 181.91 21.70 203.61
RCC NP3 S/S pipe - 400mm dia 176.00 21.75 8.80 206.55 24.64 231.19
RCC NP3 S/S pipe - 450mm dia 200.00 24.72 10.00 234.72 28.00 262.72
RCC NP3 S/S pipe - 500mm dia 229.00 28.3 11.45 268.75 32.06 300.81
RCC NP3 S/S pipe - 600mm dia 333.00 41.16 16.65 390.81 46.62 437.43
RCC NP3 S/S pipe - 700mm dia 398.00 49.19 19.90 467.09 55.72 522.81
RCC NP3 S/S pipe - 800mm dia 483.00 59.7 24.15 566.85 67.62 634.47
RCC NP3 S/S pipe - 900mm dia 653.00 80.71 32.65 766.36 91.42 857.78
RCC NP3 S/S pipe - 1000mm dia 788.00 97.4 39.40 924.80 110.32 1035.12
*
OBSERVED DATA FOR TESTING OF 450 MM DIA PSC MAIN : Pumping main to Hydralic field test pressure
including transportation of Water with minimum lead of 500 M
(Length = 500 Mts) taking out put / 500 Mts. Unit = 1 Rmt.
Labour
Fitters (2 x 3 days) (including LC)
Fitters I Class ( Labour-Irrigation-Skilled-Sn.6) 3.000 day 648.00 1 day 1944.00
Fitters II Class ( Labour-Irrigation-semi Skilled-Sn.9) 3.000 day 540.00 1 day 1620.00
Machinery
Hire chargers for Hydralic field test pressure testing 3.000 days 1200.00 1 days 3600.00
including transportation of water @ Rs. 1200/-
(1000+200) / day
Material
Pressure guage 0.050 Nos 500.00 1 Nos 25.00
3/4" G.I. Pipe (20 mm) cost vide ( BMW-F.81 - 3.000 RM #REF! 1 RM #REF!
BMW-F.82 ) - sanitary SSR
Specials 1 Ls 500.00 1 Ls 500.00
Dummies 0.100 No. 1500.00 1 Each 150.00
Diesel (2 Lts. / Hr) 30 Hrs.(item No.4 of Pg.22) 60.000 Lts. #REF! 1 Lts. #REF!
(T) Total Rate per 500 Mts. #REF!
(r) Rate per 1 Rmt for 450 mm dia #REF!
(R) Rate per 1 Rmt for 10 mm dia = (10/450) x r #REF!
447524687.xlsx - data-Road
18 PHE-LRCS-6 : Lowering the RCC S/S pipes carefully Page 1733into the trenches laying them true to alignment and gradient,
of 2191
jointing with rubber rings and testing including filling with water with a water lead upto 500 meters including cost of
rubber rings as per BIS No. 783/1985 - RCC-NP2
Unit= 1 rmt
Taking out put 100 rmt
a Lowering - RCC S/S pipes - 80 mm dia -NP-2 80 mm dia
a) Labour
Mason 1st class(labour-Irrigation.S.N.11) 0.780 day 564.00 1 day 439.92
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 1.800 day 540.00 1 day 972.00
35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 5.000 day 510.00 1 day 2550.00
Woman mazdoor (Labour-Irrigation-Unskilled- 1.300 day 510.00 1 day 663.00
S.N.4) 4624.92
b) Material
Rubber rings conforming BIS 5382/1985-including 50.000 each 30.51 1 each 1525.50
CED & ST
c) Testing
Testing of Pipelines with required pressure as per 100.000 rm #REF! 1 rm #REF!
relevant IS Specification including filling with water
with a water lead upto 500 M, including hire
charges of testing equipment, labour and Materials
needed for testing (as per Sub Analysis 2 A)
19 PHE-LRCS-6 : Lowering the RCC S/S pipes carefully into the trenches laying them true to alignment and gradient,
jointing with rubber rings and testing including filling with water with a water lead upto 500 meters including cost of
rubber rings as per BIS No. 783/1985 - RCC-NP3
447524687.xlsx - data-Road
Unit= 1 rmt Page 1738 of 2191
Taking out put 100 rmt
a Lowering - RCC S/S pipes -300 mm dia - NP-3 300 mm dia
a) Labour
Mason 1st class (labour-Irrigation.S.N.11) 1.750 day 564.00 1 day 987.00
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 4.140 day 540.00 1 day 2235.60
35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 11.600 day 510.00 1 day 5916.00
Woman mazdoor (Labour-Irrigation-Unskilled- 2.300 day 510.00 1 day 1173.00
S.N.4) 10311.60
b) Material
Rubber rings conforming BIS 5382/1985-including CED & 40.000 each 152.57 1 each 6102.80
ST
c) Testing
Testing of Pipelines with required pressure as per 100.000 rm #REF! 1 rm #REF!
relevant IS Specification including filling with water
with a water lead upto 500 M, including hire
charges of testing equipment, labour and Materials
needed for testing (as per Sub Analysis 2 A)
a) Labour
Mason 1st class (labour-Irrigation.S.N.11) 1.900 day 564.00 1 day 1071.60
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 4.500 day 540.00 1 day 2430.00
35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 12.700 day 510.00 1 day 6477.00
Woman mazdoor (Labour-Irrigation-Unskilled- 2.400 day 510.00 1 day 1224.00
S.N.4) 11202.60
b) Material
Rubber rings conforming BIS 5382/1985-including CED & 40.000 each 181.91 1 each 7276.40
ST
c) Testing
Testing of Pipelines (as per Sub Analysis 2 A) 100.000 rm #REF! 1 rm #REF!
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 100 rmt (f+g) #REF!
Rate per rmt = h/100 #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!
a) Labour
Mason 1st class (labour-Irrigation.S.N.11) 2.100 day 564.00 1 day 1184.40
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 4.900 day 540.00 1 day 2646.00
35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 13.900 day 510.00 1 day 7089.00
Woman mazdoor (Labour-Irrigation-Unskilled- 2.900 day 510.00 1 day 1479.00
S.N.4) 12398.40
b) Material
447524687.xlsx - data-Road
Rubber rings conforming BIS 5382/1985-including CEDPage
& 1739 40.000
of 2191 each 206.55 1 each 8262.00
ST
c) Testing
Testing of Pipelines (as per Sub Analysis 2 A) 100.000 rm #REF! 1 rm #REF!
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 100 rmt (f+g) #REF!
Rate per rmt = h/100 #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!
a) Labour
Mason 1st class (labour-Irrigation.S.N.11) 2.250 day 564.00 1 day 1269.00
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 5.250 day 540.00 1 day 2835.00
35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 15.000 day 510.00 1 day 7650.00
Woman mazdoor (Labour-Irrigation-Unskilled- 3.300 day 510.00 1 day 1683.00
S.N.4) 13437.00
b) Material
Rubber rings conforming BIS 5382/1985-including CED & 40.000 each 234.72 1 each 9388.80
ST
c) Testing
Testing of Pipelines with required pressure (as per 100.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 100 rmt (f+g) #REF!
Rate per rmt = h/100 #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!
a) Labour
Mason 1st class (labour-Irrigation.S.N.11) 2.430 day 564.00 1 day 1370.52
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 5.670 day 540.00 1 day 3061.80
35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 16.200 day 510.00 1 day 8262.00
Woman mazdoor (Labour-Irrigation-Unskilled- 3.300 day 510.00 1 day 1683.00
S.N.4) 14377.32
b) Material
Rubber rings conforming BIS 5382/1985-including CED & 40.000 each 268.75 1 each 10750.00
ST
c) Testing
Testing of Pipelines with required pressure (as per 100.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 100 rmt (f+g) #REF!
Rate per rmt = h/100 #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!
447524687.xlsx - data-Road
a) Labour Page 1740 of 2191
Mason 1st class (labour-Irrigation.S.N.11) 2.750 day 564.00 1 day 1551.00
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 6.450 day 540.00 1 day 3483.00
35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 16.300 day 510.00 1 day 8313.00
Woman mazdoor (Labour-Irrigation-Unskilled- 3.300 day 510.00 1 day 1683.00
S.N.4) 15030.00
b) Material
Rubber rings conforming BIS 5382/1985-including CED & 40.000 each 390.81 1 each 15632.40
ST
c) Testing
Testing of Pipelines with required pressure (as per 100.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 100 rmt (f+g) #REF!
Rate per rmt = h/100 #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!
15 Manufacture as per company’s standard specifications, supply and delivery of encapsulated plastic steps for man
holes anywhere in A.P. including cost of materials packing as per company’s standards, loading, transportation,
unloading and stacking at site of work etc, complete but excluding taxes such as sales tax, C.E.D and others etc., as
applicable.
Table 29, Pg No.82 of the SSR 1 No 166.00 1 each 166.00
Add CED @ 0.00% 0.00
Add ST @ 0.00% 0.00
Total Rs 166.00
Overheads & Contractors Profit on basic cost 13.615% 22.60
Rate per each 188.60
Add VAT & Labour cess etc. @ 0% 0.00
Rate per each 188.60
447524687.xlsx - data-Road
CONVEYANCE CHARGES OF MATERIALS AS PER SoR 2018-19 (COMMON TO ALL DEPARTMENTS).
LEAD, LIFT, LOADING AND UNLOADING CHARGES FOR MATERIALS FOR THE YEAR: 2018-19
( Pg. ….. to ….. of Bld.Items )
1. For total lead up to 150 m (including initial lead ) lead charges by head load only shall be adopted irrespective of
mode of conveyance.
2. For total lead exceeding 150 m conveyance by mechanical means only shall be adopted irrespective of mode of
conveyance.
3. The rates for loading at quarry including idle hire charges of trucks and hire charges
per for each kilometer and up to 5 km are cumulative and inclusive of total charges for
Preceding lead.
4. Unless otherwise specified lead charges for Earth / Sand / Gravel / Aggregates and Stones are for loose volume
and not for compacted or in-situ volume.
5. The rates for lift charges, lead charges, hire charges are cumulative and inclusive of rates for preceding lift, lead
and hire charges.
6. Lift charges are not payable where conveyance of materials is by mechanical means to final placing point.
7. Loading and unloading charges are not payable for conveyance by head load.
8. Loading charges are not payable for conveyance by mechanical means for disposal of
excavated materials beyond initial lead of 50 m wherever specified.
9. Loading and unloading charges are not payable for conveyance by mechanical means for disposal of excavated
materials beyond initial lead of 1 km wherever specified.
10. The rates for unloading of materials except earth, sand, gravel, coarse aggregate, rubble, size stone and cut
stone are inclusive of stacking.
11. Hire charges are per 1KM for tippers and trucks for transport of materials from work site to dump yard and other
places are cumulative& includes previous km up to 5 kms
12. For detailed calculations, refer to the Lead & Lift charges (Common to all Departments) chapter of Irrigation &
CAD works (Part-1), A.P. Revised Standard data. The lead & lift charges are inclusive of 13.615% Contractors profit
and Overhead charges.
A. (LEAD) CONVEYANCE CHARGES FOR MATERIALS BY HEAD LOAD FOR THE YEAR: 2016-17
COM-LDLFT-1
Total lead up to 50 m
1 (covered by item rate) initial lead initial lead initial lead
Note 1. No loading or unloading charges are admissible for conveyance by head load.
s: 2. For total lead exceeding 150 m conveyance charges by mechanical means only shall be adopted irrespective of
mode of conveyance.
3.The lead & lift charges are inclusive of 13.615% Contractor Profit and Over Head charges
B. COM-LDLFT-2: ( LEAD) CONVEYANCE CHARGES FOR MACHINERY PER KILOMETER FOR TRANSPORTING MA
TIPPERS AND TRUCKS EXCLUDING LOADING, UNLOADING AND IDLE HIRE CHARGES OF MACHINERY FOR
2017-18
( No loading and unloading charges allowed for machinery loading and unloading )
Lead up to 1 km
1 34.20 33.00 20.60 48.60
Lead up to 2 km
2 47.90 46.20 28.90 68.00
Lead up to 3 km
3 63.90 63.90 39.90 94.00
Lead up to 4 km
4 77.60 77.60 48.50 114.10
Lead up to 5 km
5 91.30 91.30 57.10 134.30
for Every km beyond
6 5 km up to 30 km 13.70 13.70 8.60 20.10
for Every km beyond
7 30 km 11.40 11.40 7.10 16.80
Note: The lead & lift charges are inclusive of 13.615% Contractor Profit and Over Head charges
C. COM-LDLFT-3 : LOADING AND UNLOADING CHARGES BY MANUAL MEANS
( idle hire charges of trucks are not added
Rubble/ size
Earth / Sand
stone/ cut stone/
/Gravel Murrum/ / cement in steel in
Sl Description of item Coarse
Surki/ Rs/tonne Rs./tonne
No. aggregate, Lime
Rs / cum
in Rs/cum
Loading
1 22.90 45.80 75.50 90.50
Unloading
2 11.45 22.90 75.50 90.50
Note: The lead & lift charges are inclusive of 13.615% Contractor Profit and Over Head charges
D.COM-LDLFT-4 : LOADING AND UNLOADING CHARGES BY MANUAL MEANS (including idle hire charges of
trucks )
Rubble/ size
Earth / Sand /Gravel stone/ cut stone/
cement in steel in
S Description of item Murrum/ / Surki/ Coarse
Rs/tonne Rs./tonne
No. Rs / cum aggregate, Lime
in Rs/cum
Loading
1 123.00 145.90 185.60 200.60
Unloading
2 44.70 72.95 185.60 200.60
Note: The lead & lift charges are inclusive of 13.615% Contractor Profit and Over Head charges
Loading
1 55.50 110.60
Unloading
2 17.30 17.30
PCC
Earth / Sand /Gravel Cement
slab/Shahbad
Total lift Murrum/ Lime/ /Reinforce-
slab / CC block/
SNo ( Total lift includes Surki/ Size stone / ment steel Str
BS slab /
. initial lift ) Cut stone Rubble / steel
Laterite/ Wood
Coarse aggregate Rs / tonne
Rs / cum
Rs / cum
Note: The lead & lift charges are inclusive of 13.615% Contractor Profit and Over Head charges
DEPARTMENTS).
YEAR: 2018-19
adopted irrespective of
irrespective of mode of
r disposal of excavated
YEAR: 2016-17
adopted irrespective of
Head charges
FOR TRANSPORTING MATERIALS BY
S OF MACHINERY FOR THE YEAR:
and unloading )
(Lead)
charges for
(Lead)
trucks and
charges for
tippers per
trucks per
cu.meter
1000 nos. of
water/
bricks
1000 litres
20.50 55.10
28.70 77.10
38.30 102.80
46.40 124.80
54.60 146.80
8.20 22.00
6.80 18.40
brick work
Rs/1000
No
62.90
62.90
rges
brick work
Rs/1000
No
244.60
244.60
rges
L MEANS
rges
KODADA MUNICIPALITY
GENERAL ABSTRACT
Sub-Total. A Rs.
2 Add VAT @ 5%
4 Provision towards QC @ 1%
Sub-Total. B Rs.
Say Rs.
r Amrut
Amount in Rs.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Page 1750 of 2191
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
4 BLD-CSTN-3-6 ( 23 ) -Hand mixing up to Plinth Level : Plain Cement
concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse
aggregate ) using 40mm size Hard Granite Machine Crushed Metal including
cost and conveyance of all materials like cement, sand, coarse aggregate
water etc., to site , seigniorage charges on all materials, labour charges ,
for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface
to the required level curing etc., complete for finished item of work.for
foundation and under flooring bed. Data- Bld -
15
a For levelling the walking track between walls 1 x 1 285.30 2.00 0.100 57.06
Total Qty 57.06 Cum 3726.65 1 Cum
5 RBR-CCPV-13 - ii: Providing and Laying of Interlocking Concrete Block
Pavements using PHOENIX or equivalent high strength Cement Concrete
interlocking Regular Pavers of 50 mm thickness of M- 40 Grade of which top
12 mm thick shall be for colour pigmentation with imported colours and
white cement to get required reflective glazing inclusive of all taxes - as per
drawing and Technical Specification Clause 1504 MORD Data- Bld -
124
a For Walking Track/ Path ways 1 x 1 285.30 2.00 570.60
Total Qty 570.60 Sqm 570.70 1 Sqm
Sub- Total for Path ways -A
C Greenary & Play Area
6 RBR-HRTC-5: Making lawns including ploughing and breaking of clod,
removal of rubbish, dressing and supplying doobs grass roots and planting at
15 cm apart, including supplying and spreading of farm yard manure at rate
Data -Parks
of 0.18 cum per 100 sqm including maintaning for 1 year. -5
Area as per Drawing (4x 166.5) +(2x30) 1 x 1 722.00
722.00 Sqm 37.60 1 Sqm
7 RBR-HRTC-8: Planting ( Running metres 200 plants and 800 shrubs in two
rows in one km length of road where width of verge is 3m and above.)as per Data -Parks
Specification 307 MORTH -8
Area as per Drawing 1 x 4 51.00 204
204.00 Rmt 124.94 1 Rmt
8 RBR-HRTC-9: Planting of trees by the road side (Avenue trees) in 0.60 m dia
holes, 1 m deep dug in the ground, mixing the soil with decayed farm
yard/sludge manure, planting the saplings, backfilling the trench, watering,
Data -Parks
fixing the tree guard and maintaining the plants for one year -9
Ornamental trees along the compound wall in side the park 1 x 28 28.00 Nos 1550.80 1 Nos
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
9 RBR-HRTC-7: Planting permanent hedges including digging of trenches, 60
cm wide and 45 cm deep, refilling the excavated earth mixed with farmyard
manure, supplied at the rate of 4.65 cum per 100 metres and supplying and
planting hedge plants at 30 cm apart, and maintaining for 1 year Data -Parks
- 7 (a)
as per Drawing along the compound wall 1 x 1 167 167.00 Rmt 222.40 1 Rmt
10 Planting Speciman plants including digging of pits 60cm. Cubes, loosening of
15cm. Bottom red soil, filling with soil with 10 kg Compost + 100 DAP per pit
staking gap filling with in two month after planting.
Golden bamboo 8” 1 x 5 5 Nos 862.50 1 No
Fercaria 2” 1 x 5 5 Nos 1437.50 1 No
Ficus 4” (Verites). 1 x 5 5 Nos 575.00 1 No
Bottle Bush 1 x 5 5 Nos 690.00 1 No
Sub- Total for Greenary - B
C Children Play Area
11 BLD-CSTN-2-1 (9) : Earth work excavation for foundations and depositing on
bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308). Data- Bld -
3
for foundations of Slide and Ladder 1 x 3 0.60 0.60 0.75 0.81
for foundations of Swing Two seater 1 x 2 0.60 0.60 0.75 0.54
for foundations of Spiral Swing 1 x 1 0.75 0.75 0.75 0.42
for foundations of Sea-Saw 4 seater 1 x 1 0.75 0.75 0.75 0.42
for foundations of Merry go round 1 x 1 0.75 0.75 0.90 0.51
for Idle Park bench 6 x 4 0.45 0.45 0.45 2.19
for filling Sand 1 x 1 36.00 4.40 0.30 47.52
52.41 Cum 210.92 1 Cum
12 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating
each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310)
Filling sand - Children play area 1 x 1 36.0 4.40 0.30 47.52 Cum 910.40 1 Cum
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
13 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level :
Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate:
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of Data- Bld -
work.for foundation and under flooring bed. 15
for foundations of Slide and Ladder 1 x 3 0.60 0.60 0.75 0.81
for foundations of Swing Two seater 1 x 2 0.60 0.60 0.75 0.54
for foundations of Spiral Swing 1 x 1 0.75 0.75 0.75 0.42
for foundations of Sea-Saw 4 seater 1 x 1 0.75 0.75 0.75 0.42
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
for foundations of Merry go round 1 x 1 0.75 0.75 0.90 0.51
for Idle Park bench 6 x 4 0.45 0.45 0.45 2.19
4.89 Cum 3785.55 1 Cum
14 Providing Children play equipment of standard make including cost and
conveyance of all material and all labour charges, all operational and
incidental charges etc complete.
Slide and Ladder 8 feet 1 x 1 1 No 18083.00 1 No
Swing Two seater 1 x 1 1 No 15087.00 1 No
Spiral Swing 1 x 1 1 No 18618.00 1 No
Sea-Saw 4 seater 1 x 1 1 No 13482.00 1 No
Merry go round 1 x 2 2 No 17013.00 1 No
Providing seating area development by providing cast Iron /Cement seats
as directed by Engineer incharge etc, complete.
Idle Park bench 1 x 6 6 No 13418.00 1 No
Sub- Total for Children Play area - C
D Garden Posts with LED Lamps
15 ELEC-13.2.2 : Fabrication and Supply of M.S. Poles for garden posts with 'B' ele ssr-7-
class 6 mtrs long 60.25mm outer dia with base plate and suitable pole cap 10-1 d
including cost and conveyance of all material including fixing of luminaire and
labour charges etc., complete. 6Mtrs 'B' Class M.S. pipe of 60.25mm dia with
base plate and suitable pole cap
Along the Path ways as per requirement 1 x 13 13 Nos #REF! 1 each
16 Supply and fixing of 50mm dia 0.5 mtrs single arm M.S. pipe bracket with
sleeve and fasteners with necessary angle including painting etc., complete
on existing pole including fixing of luminaire.
1 x 13 13 Nos #REF! 1 each
17 13.4.6 : Erection charges for 6Mtrs. Long MS / GI Garden post including
excavation of pit, concreting 1:3:6 and painting including cost and
conveyance of all materials including fixing of luminaire and labour charges
etc., complete.
Along the Path ways as per requirement 1 x 13 13 Nos #REF! 1 each
18 Supply and fixing of 300mm x 180mm x 140mm No.16 gauge CRCA sheet
box with hinged door and locking arrangements and din channel for fixing
2Nos MCBs duly powder coated with matching colour of poles including
fixing with necessary arrangments etc., complete.
1 x 13 13 Nos #REF! 1 each
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
Supply and fixing of 6-32A 10KA DP MCB, C/D Curve ISI Mark of make
Legrand / Schneider.
1 x 13 13 Nos #REF! 1 each
19 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain
Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of Data- Bld -
work with nomonal reinforcement Pi r2 d 18
a for Coping of Lamp post above GL 1 x 13 3.14 0.04 0.45 0.73 Cum 5044.84 1 Cum
20 ELEC-3.11.1: Supply and transportation of ......... LED Street light Body ele ssr-3-9-
made of high grade pressure die – cast Aluminum alloy with corrosion 15
resistant powder coat, having protective toughened glass cover, Less Glare,
IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66)
protected, universal Voltage 100 - 270 V AC, P.F, ≥ 0.90, high power LED's
having efficacy ≥130 lumens/watt, and junction temperature < 75°C, with
Ingress protection IP66, Driver surge protection 4KV, with optics distribution
Type II medium, THD<10% at 110 Volts AC, driver efficiency ≥90%, CCT:
5600K, minimum CRI≥80, Inbuilt Electrical protections like Over voltage,
short circuit, Over load, Open Circuit, Miswiring, Intelligent pole mounting
option provides flexibility of vertical or horizontal pole mounting option
complete, with Top Openable Maintenance and Manufacture has to submit
LM79,LM80 & Photobiological Safety Report. Luminaire Performance
Complies to IS10322 (Part 5/Sec 3) & IEC 60598-1,IEC 60529 and ISO
certified company. LUMINAIRE MAKE : PHILIPS / OSRAM / GE /
CROMPTON / BAJAJ / SCHREDER / VIN / HALONIX / HAVELLS / HPL.
LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG /
LG LEDs.
Along the Path ways as per requirement 1 x 13 13.00 Nos #REF! 1 each
21 BLD-ELEC-3-1-4 : Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C.
insulated flexible copper cable in existing pipe for mains inlcuding all labour
charges etc., complete.
1 x 13 5.00 65.00 Rmt #REF! 1 Rmt
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
22 BLD-ELEC-3-1-2 : Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C.
insulated flexible copper cable in existing pipe for earth continuity including
all labour charges etc., complete.
1 x 13 5.00 65.00 Rmt #REF! 1 Rmt
23 ELEC-4.1.3 : Supply of 6 Sqmm 2 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part -
I) of Makes : Torrent / Universal / Unicab / Polycab / Havells / Gloster / KEI
Under ground Cable connecting all poles and extra for pole to panel 1 x 13 40.00 520.00 Rmt #REF! 1 Rmt
24 ELEC-4.1.5 : Supply of 10 Sqmm 4 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part -
I) of Makes : Torrent / Universal / Unicab / Polycab / Havells / Gloster / KEI.
from Panel to incomming 1 x 1 30.00 30.00 Rmt #REF! 1 Rmt
25 ELEC-15.6.1 : Earth work excavation of Trench in hard ground soil, laying of
U.G cables upto 50 Sq,mm on sand cushion covering the cable with bricks
and back filling of Trench duly providing route indicator embedded in C.C
including cost and conveyance of materials and labour charges etc.,
complete.
for under ground Cabling 1 x 13 30.00 390.00 Rmt #REF! 1 Rmt
26 Supply, Transportation, fabrication and erection of following guage CRCA
sheet steel enclosure for power control cubicle panel / boxes etc., including
cutting, bending drilling, welding and reveting etc., complete with cleaning
with 7 tank process and painting with powder coating including cost and
conveyance of all materials and labour charges.
1 No of 0.9m x 1.20m size Box 1 x 1 1.200 0.900 1.08 Sqm #REF! 1 Sqm
27 BLD-ELEC-4-1-3: Supply and erection of Panel mounting cubical type ( 100
to 250A ) TPN 415V, 50 Hz. switch disconnector fuse unit complete with front
drive mechanism with door inter lock, padlocking arrangement etc., complete
with fuse links on existing control panel.
1 x 1 1.00 Nos #REF! 1 each
28 BLD-ELEC-4-3-3: Supply and erection of Panel mounting 125A, 4 Pole,
25kA, MCCB with thermal magnetic setting / Microprocessor based release
arrangement with all connections etc., complete on existing panel.
1 x 1 1.00 Nos #REF! 1 each
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
29 ELEC-3.5.1: Supply of Automatic Street Light Control System with Optical
Sensor, Low volatage / High voltage trip and reset, operating voltage 150 -
280V AC, 50 HZ with suitable SMC enclousure of IP 54 protection, MCBs
and contactor suitable to control the load of 3 KW of single phase load with
necessary clamping arrangements. Makes : Swadeep Nature Switch / Light
Mate.
1 x 1 1.00 Nos #REF! 1 each
30 BLD-ELEC-5-1-1 : Providing independent earthling by excavating a trench to
a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm
dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume
pipe ring duly providing staggered holes including filling with equal
proportion of Salt and Charcoal in layers and all labour charges etc.,
complete for small quarters.
Amount
29486.62
163329.00
51947.42
Amount
212642.65
325641.42
783047.11
27147.20
25487.76
43422.40
Amount
37140.80
4312.50
7187.50
2875.00
3450.00
151023.16
11054.32
43262.21
Amount
Amount
18511.34
18083.00
15087.00
18618.00
13482.00
34026.00
80508.00
252631.87
#REF!
#REF!
#REF!
#REF!
Amount
#REF!
3683.00
#REF!
#REF!
Amount
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Amount
#REF!
#REF!
#REF!
#REF!
550000.00
#REF!
KODADA MUNICIPALITY
Construction of Toilets
ABSTRACT AND DETAILED ESTIMATE
S.N. Description of Item Nos L B D Quantity Rate Per
A EWE for footings : A1,B1,A2,B2 1 x 4 1.30 1.30 1.80 12.17
12.17 Cum
1 RBR-FNDN-1-A-i -manual means : Earthwork excavation for structures in all types of
soils up to 3.00 Mts depth below GL as per drawing and technical specifications
including setting out, construction of shoring and bracing, removal of stumps and
other deleterious material and disposal upto a lead of 50 m, dressing of sides and
bottom and backfilling in trenches with excavated suitable material as per Technical Bld up to 3F
Specification 305 MORD / 304 MORTH. for Sumps,Thrust blocks, Chambers and S.No 7
Man
in all Holes etc.
types of by manual
soils means,
for footings 80 % 9.74 Cum 221.47 1 Cum
2 BLD-CSTN-2-7 - (15) - Hard rock (blasting prohibited)-Upto 3 m depth
Earth work excavation and depositing on bank for all lifts and with an initial lead of
10m including all operational, incidental, labour charges such as shoring ,sheeting,
planking, strutting, etc. complete for finished item of work including seigniorage
excluding dewatering charges etc as per SS - 20 B (APSS 308). Bld up to 3F
S.No 6
in Hard rocky soils 20 % 2.43 Cum 1893.14 1 Cum
B Earth work excavation for fundation of Walls
Toilet - long walls 1 x 2 4.90 0.45 0.40 1.76
Toilet - short walls 1 x 3 3.02 0.45 0.40 1.63
Toilets - inner short walls 1 x 2 1.93 0.45 0.40 0.69
Toilets - inner Long walls 1 x 1 5.05 0.45 0.40 0.91
4.99 Cum
3 BLD-CSTN-2-1 (9): Earth work excavation for foundations and depositing on bank
for all lifts and with an initial lead of 10m including all operational, incidental, labour
charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item
of work including seigniorage excluding dewatering charges etc as per SS - 20 B
(APSS 308). Bld up to 3F
S.No 1
in all types of soils 80 % 3.99 Cum Err:509 1 Cum
Total Rs.
Total Cost Say Rs.
A MUNICIPALITY
uction of Toilets
D DETAILED ESTIMATE
Amount
2157.00
4600.00
Err:509
Amount
1893.00
Amount
12379.00
46.00
Amount
11489.00
3673.00
15165.00
13394.00
Amount
5643.00
Amount
13133.00
11551.00
#REF!
Amount
4360.00
#REF!
#REF!
Amount
22314.00
9415.00
6736.00
Amount
2210.00
Amount
1463.00
2369.00
26996.00
Amount
29027.00
Amount
7598.00
5622.00
Amount
14996.00
11058.00
1238.00
Amount
20014.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
GENERAL ABSTRACT
Sub-Total. A Rs.
2 Add VAT @ 5%
4 Provision towards QC @ 1%
Sub-Total. B Rs.
Say Rs.
r Amrut
Amount in Rs.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
KODADA MUNICIPALITY
GENERAL ABSTRACT
Sub-Total. A Rs.
2 Add VAT @ 5%
4 Provision towards QC @ 1%
Sub-Total. B Rs.
Say Rs.
r Amrut
Amount in Rs.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Page 1798 of 2191
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
4 BLD-CSTN-3-13- ( 30 ) - A- Nominal mix: RCC M- 20 Nominal mix
(Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS
456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and
its fabrication charges for finished item of work, but including centering and
shuttering charges for FOUNDATIONS, PLINTH, PEDESTALS
a Footings for Main Gate pillars 1 x 2 1.30 1.30 0.20 0.68 Cum 7930.76 1 Cum
b Pedastals for Gate pillars 1 x 2 0.45 0.45 0.90 0.36 Cum 8484.75 1 Cum
5 BLD-CSTN-3-13- ( 30 ) - B- Nominal mix: RCC M- 20 Nominal mix
(Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS
456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and
its fabrication charges for finished item of work, but including centering and
shuttering charges for COLUMNS, LINTELS, WATER TANKS, RCC WALLS
IN BUILDINGS - WOODEN SCAFFOLDING
for Gate pillars 1 x 2 0.30 0.30 2.70 0.49 Cum 9973.53 1 Cum
6 BLD-CSTN-6-12-(67) : Construction of RR Masonary in Cement Mortor
( 1:8 ) Prop using hard granite stone including cost & Conveyance of all
materials like Cement, Sand , Water, Granite Stones, including Seigniorage
Charges on all Materials, ,labour charges for cutting Stones to required size
and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges
curing etc., complete for finished item of Work .
For Foundations below GL
for Compound Wall 1 x 1 41.50 0.60 0.50 12.45
12.45 Cum 3470.13 1 Cum
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
7 BLD-CSTN-6-5-(60) : Construction of CRS Masonary 1st Sort in Cement
Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of
all materials like Cement, Sand , Water, Granite Stones, labour charges for
cutting Stones to required size and shape, mixing of Cement Mortor,
Construction, Scaffolding Charges curing etc., complete for finished item of
Work .
Compound Wall Front side excluding gate 1 x 1 37.50 0.45 0.60 10.13
for pillars for fixing MS grills in front side at every 3.00m C/C 1 x 15 0.45 0.45 1.50 4.56
Deduction for CRS pillars from wall -1 x 15 0.45 0.45 0.60 -1.82
Net Qty 12.87 Cum 4074.46 1 Cum
8 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level
Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work with nomonal reinforcement
Over CRS Walls in front side for fixing the Grills (0.15+0.2)/2 2 x 13 3.00 0.225 0.175 3.07
Over CRS Pillars in front side 1 x 15 0.45 0.45 0.075 0.23
3.30 Cum 5044.84 1 Cum
9 BLD-CSTN-7-1-(72) : Providing flush Cement Pointing to CRS Masonary in
Cement Mortor (1:3) Prop . for including cost & conveyance of all materials
to site , seignaiorage charges on all materials, labour charges on all
materials, curing etc., Complete for finished item of work
Both sides of CRS walls
Compound Wall Front side excluding gate 1 x 2 37.50 0.60 45.00
for pillars for fixing MS grills in front side at every 3.00m C/C 15 x 4 0.45 1.50 40.50
85.50 Sqm 86.17 1 Sqm
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
10 BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/
Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe
500 grade as per IS 1786-1979) of different diameters for RCC works ,
including labour charges for straightening, cutting, bending to required sizes
and shapes, placing in position with cover blocks of approved materials and
size and tying and lap-splicing with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and drawings, including cost
and conveyance of steel bars, including all wastages such as overlaps,
couplings, chairs, spacer bars including cost and conveyance of binding
wire, cover blocks and all incidental, operational, labour charges such as
cutting, bending, placing in position, tying including sales and other taxes on
all materials etc., complete for finished item of work in all floors.( APSS
No.126
For Footing & Pedastals 1.04 Cum 40.00 Kg/Cum 41.60
For Columns 0.49 Cum 125.00 Kg/Cum 61.25
102.85 Kg 68.71 1 Kg
11 Supplying and fixing of MS Grills as per Drawings including fixing with 4 Nos
of MS Z holdfasts (2 on each side) duly making cutting masonry, fixing and
making to original surface neatly and painting gate with one coat of red oxide
primer including cost and conveyance of all materials,Locking arrangment,
Ornamental pieces etc ,cutting, bending, welding including all operational
charges and all labour charges etc., complete for finished item of work.
MS Grills for compound wall @ 45 Kg/each ( 2.5 x1.35m) 1 x 13 45.00 Kg/each 585.00 Kg 88.05 1 Kg
Sub- Total for Compound wall - A
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
B Children Play Area
12 BLD-CSTN-2-1 (9) : Earth work excavation for foundations and depositing on
bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308). Data- Bld -
3
for foundations of Slide and Ladder 1 x 3 0.60 0.60 0.75 0.81
for foundations of Swing Two seater 1 x 2 0.60 0.60 0.75 0.54
for foundations of Spiral Swing 1 x 1 0.75 0.75 0.75 0.42
for foundations of Sea-Saw 4 seater 1 x 1 0.75 0.75 0.75 0.42
for foundations of Merry go round 1 x 1 0.75 0.75 0.90 0.51
for Idle Park bench 2 x 4 0.45 0.45 0.45 0.73
for filling Sand 1 x 1 21.50 14.10 0.30 90.95
94.38 Cum #REF! 1 Cum
13 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating
each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310)
Filling sand - Children play area 1 x 1 21.5 14.10 0.30 90.95 Cum 910.40 1 Cum
14 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level :
Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate:
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work.for foundation and under flooring bed. Data- Bld -
15
for foundations of Slide and Ladder 1 x 3 0.60 0.60 0.75 0.81
for foundations of Swing Two seater 1 x 2 0.60 0.60 0.75 0.54
for foundations of Spiral Swing 1 x 1 0.75 0.75 0.75 0.42
for foundations of Sea-Saw 4 seater 1 x 1 0.75 0.75 0.75 0.42
for foundations of Merry go round 1 x 1 0.75 0.75 0.90 0.51
for Idle Park bench 2 x 4 0.45 0.45 0.45 0.73
3.43 Cum 3785.55 1 Cum
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
15 Providing Children play equipment of standard make including cost and
conveyance of all material and all labour charges, all operational and
incidental charges etc complete.
Slide and Ladder 8 feet 1 x 1 1 No 18083.00 1 No
Swing Two seater 1 x 1 1 No 15087.00 1 No
Spiral Swing 1 x 1 1 No 18618.00 1 No
Sea-Saw 4 seater 1 x 1 1 No 13482.00 1 No
Merry go round 1 x 2 2 No 17013.00 1 No
Providing seating area development by providing cast Iron /Cement seats
as directed by Engineer incharge etc, complete.
Idle Park bench 1 x 2 2 No 13418.00 1 No
Sub- Total for Children Play area - D
E Garden Posts with LED Lamps
16 ELEC-13.2.2 : Fabrication and Supply of M.S. Poles for garden posts with 'B' ele ssr-7-
class 6 mtrs long 60.25mm outer dia with base plate and suitable pole cap 10-1 d
including cost and conveyance of all material including fixing of luminaire and
labour charges etc., complete. 6Mtrs 'B' Class M.S. pipe of 60.25mm dia with
base plate and suitable pole cap
Along the Path ways as per requirement 1 x 10 10 Nos #REF! 1 each
17 Supply and fixing of 50mm dia 0.5 mtrs single arm M.S. pipe bracket with
sleeve and fasteners with necessary angle including painting etc., complete
on existing pole including fixing of luminaire.
1 x 10 10 Nos #REF! 1 each
18 13.4.6 : Erection charges for 6Mtrs. Long MS / GI Garden post including
excavation of pit, concreting 1:3:6 and painting including cost and
conveyance of all materials including fixing of luminaire and labour charges
etc., complete.
Along the Path ways as per requirement 1 x 10 10 Nos #REF! 1 each
19 Supply and fixing of 300mm x 180mm x 140mm No.16 gauge CRCA sheet
box with hinged door and locking arrangements and din channel for fixing
2Nos MCBs duly powder coated with matching colour of poles including
fixing with necessary arrangments etc., complete.
1 x 10 10 Nos #REF! 1 each
20 Supply and fixing of 6-32A 10KA DP MCB, C/D Curve ISI Mark of make
Legrand / Schneider.
1 x 10 10 Nos #REF! 1 each
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
21 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain
Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of Data- Bld -
work with nomonal reinforcement Pi r2 d 18
a for Coping of Lamp post above GL 1 x 10 3.14 0.04 0.45 0.57 Cum 5044.84 1 Cum
22 ELEC-3.11.1: Supply and transportation of ......... LED Street light Body ele ssr-3-9-
made of high grade pressure die – cast Aluminum alloy with corrosion 15
resistant powder coat, having protective toughened glass cover, Less Glare,
IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66)
protected, universal Voltage 100 - 270 V AC, P.F, ≥ 0.90, high power LED's
having efficacy ≥130 lumens/watt, and junction temperature < 75°C, with
Ingress protection IP66, Driver surge protection 4KV, with optics distribution
Type II medium, THD<10% at 110 Volts AC, driver efficiency ≥90%, CCT:
5600K, minimum CRI≥80, Inbuilt Electrical protections like Over voltage,
short circuit, Over load, Open Circuit, Miswiring, Intelligent pole mounting
option provides flexibility of vertical or horizontal pole mounting option
complete, with Top Openable Maintenance and Manufacture has to submit
LM79,LM80 & Photobiological Safety Report. Luminaire Performance
Complies to IS10322 (Part 5/Sec 3) & IEC 60598-1,IEC 60529 and ISO
certified company. LUMINAIRE MAKE : PHILIPS / OSRAM / GE /
CROMPTON / BAJAJ / SCHREDER / VIN / HALONIX / HAVELLS / HPL.
LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG /
LG LEDs.
Along the Path ways as per requirement 1 x 10 10.00 Nos #REF! 1 each
23 BLD-ELEC-3-1-4 : Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C.
insulated flexible copper cable in existing pipe for mains inlcuding all labour
charges etc., complete.
1 x 10 5.00 50.00 Rmt #REF! 1 Rmt
24 BLD-ELEC-3-1-2 : Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C.
insulated flexible copper cable in existing pipe for earth continuity including
all labour charges etc., complete.
1 x 10 5.00 50.00 Rmt #REF! 1 Rmt
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
25 ELEC-4.1.3 : Supply of 6 Sqmm 2 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part -
I) of Makes : Torrent / Universal / Unicab / Polycab / Havells / Gloster / KEI
Under ground Cable connecting all poles and extra for pole to panel 1 x 10 40.00 400.00 Rmt #REF! 1 Rmt
26 ELEC-4.1.5 : Supply of 10 Sqmm 4 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part -
I) of Makes : Torrent / Universal / Unicab / Polycab / Havells / Gloster / KEI.
from Panel to incomming 1 x 1 30.00 30.00 Rmt #REF! 1 Rmt
27 ELEC-15.6.1 : Earth work excavation of Trench in hard ground soil, laying of
U.G cables upto 50 Sq,mm on sand cushion covering the cable with bricks
and back filling of Trench duly providing route indicator embedded in C.C
including cost and conveyance of materials and labour charges etc.,
complete.
for under ground Cabling 1 x 10 30.00 300.00 Rmt #REF! 1 Rmt
28 Supply, Transportation, fabrication and erection of following guage CRCA
sheet steel enclosure for power control cubicle panel / boxes etc., including
cutting, bending drilling, welding and reveting etc., complete with cleaning
with 7 tank process and painting with powder coating including cost and
conveyance of all materials and labour charges.
1 No of 0.9m x 1.20m size Box 1 x 1 1.200 0.900 1.08 Sqm #REF! 1 Sqm
29 BLD-ELEC-4-1-3: Supply and erection of Panel mounting cubical type ( 100
to 250A ) TPN 415V, 50 Hz. switch disconnector fuse unit complete with front
drive mechanism with door inter lock, padlocking arrangement etc., complete
with fuse links on existing control panel.
1 x 1 1.00 Nos #REF! 1 each
30 BLD-ELEC-4-3-3: Supply and erection of Panel mounting 125A, 4 Pole,
25kA, MCCB with thermal magnetic setting / Microprocessor based release
arrangement with all connections etc., complete on existing panel.
1 x 1 1.00 Nos #REF! 1 each
31 ELEC-3.5.1: Supply of Automatic Street Light Control System with Optical
Sensor, Low volatage / High voltage trip and reset, operating voltage 150 -
280V AC, 50 HZ with suitable SMC enclousure of IP 54 protection, MCBs
and contactor suitable to control the load of 3 KW of single phase load with
necessary clamping arrangements. Makes : Swadeep Nature Switch / Light
Mate.
1 x 1 1.00 Nos #REF! 1 each
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
32 BLD-ELEC-5-1-1 : Providing independent earthling by excavating a trench to
a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm
dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume
pipe ring duly providing staggered holes including filling with equal
proportion of Salt and Charcoal in layers and all labour charges etc.,
complete for small quarters.
Amount
3797.00
3786.00
11016.00
Amount
5393.00
3055.00
4887.00
43203.00
Amount
52438.00
16648.00
7368.00
Amount
7067.00
51509.00
210167.00
Amount
#REF!
82800.88
12984.44
Amount
18083.00
15087.00
18618.00
13482.00
34026.00
26836.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Amount
2876.00
#REF!
#REF!
#REF!
Amount
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Amount
#REF!
#REF!
#REF!
400000.00
#REF!
GENERAL ABSTRACT
Sub-Total. A Rs.
2 Add VAT @ 5%
4 Provision towards QC @ 1%
Sub-Total. B Rs.
Say Rs.
Amrut
Amount in Rs.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Page 1818 of 2191
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
4 BLD-CSTN-3-13- ( 30 ) - A- Nominal mix: RCC M- 20 Nominal mix
(Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS
456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and
its fabrication charges for finished item of work, but including centering and
shuttering charges for FOUNDATIONS, PLINTH, PEDESTALS
a Footings for Main Gate pillars 1 x 2 1.30 1.30 0.20 0.68 Cum 7930.76 1 Cum
b Pedastals for Gate pillars 1 x 2 0.45 0.45 0.90 0.36 Cum 8484.75 1 Cum
5 BLD-CSTN-3-13- ( 30 ) - B- Nominal mix: RCC M- 20 Nominal mix
(Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS
456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and
its fabrication charges for finished item of work, but including centering and
shuttering charges for COLUMNS, LINTELS, WATER TANKS, RCC WALLS
IN BUILDINGS - WOODEN SCAFFOLDING
for Gate pillars 1 x 2 0.30 0.30 2.70 0.49 Cum 9973.53 1 Cum
6 BLD-CSTN-6-12-(67) : Construction of RR Masonary in Cement Mortor
( 1:8 ) Prop using hard granite stone including cost & Conveyance of all
materials like Cement, Sand , Water, Granite Stones, including Seigniorage
Charges on all Materials, ,labour charges for cutting Stones to required size
and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges
curing etc., complete for finished item of Work .
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
7 BLD-CSTN-6-5-(60) : Construction of CRS Masonary 1st Sort in Cement
Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of
all materials like Cement, Sand , Water, Granite Stones, labour charges for
cutting Stones to required size and shape, mixing of Cement Mortor,
Construction, Scaffolding Charges curing etc., complete for finished item of
Work .
Compound Wall Front side excluding gate 1 x 1 6.00 0.45 0.60 1.62
for pillars for fixing MS grills in front side at every 3.00m C/C 1 x 3 0.45 0.45 1.50 0.91
Deduction for CRS pillars from wall -1 x 3 0.45 0.45 0.60 -0.36
Net Qty 2.17 Cum 4074.46 1 Cum
8 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level
Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work with nomonal reinforcement
Over CRS Walls in front side for fixing the Grills (0.15+0.2)/2 2 x 2 3.00 0.225 0.175 0.47
Over CRS Pillars in front side 1 x 3 0.45 0.45 0.075 0.05
0.52 Cum 5044.84 1 Cum
9 BLD-CSTN-7-1-(72) : Providing flush Cement Pointing to CRS Masonary in
Cement Mortor (1:3) Prop . for including cost & conveyance of all materials
to site , seignaiorage charges on all materials, labour charges on all
materials, curing etc., Complete for finished item of work
Both sides of CRS walls
Compound Wall Front side excluding gate 1 x 2 6.00 0.60 7.20
for pillars for fixing MS grills in front side at every 3.00m C/C 3 x 4 0.45 1.50 8.10
15.30 Sqm 86.17 1 Sqm
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
10 BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/
Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe
500 grade as per IS 1786-1979) of different diameters for RCC works ,
including labour charges for straightening, cutting, bending to required sizes
and shapes, placing in position with cover blocks of approved materials and
size and tying and lap-splicing with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and drawings, including cost
and conveyance of steel bars, including all wastages such as overlaps,
couplings, chairs, spacer bars including cost and conveyance of binding
wire, cover blocks and all incidental, operational, labour charges such as
cutting, bending, placing in position, tying including sales and other taxes on
all materials etc., complete for finished item of work in all floors.( APSS
No.126
For Footing & Pedastals 1.04 Cum 40.00 Kg/Cum 41.60
For Columns 0.49 Cum 125.00 Kg/Cum 61.25
102.85 Kg 68.71 1 Kg
11 Supplying and fixing of MS Grills as per Drawings including fixing with 4 Nos
of MS Z holdfasts (2 on each side) duly making cutting masonry, fixing and
making to original surface neatly and painting gate with one coat of red oxide
primer including cost and conveyance of all materials,Locking arrangment,
Ornamental pieces etc ,cutting, bending, welding including all operational
charges and all labour charges etc., complete for finished item of work.
MS Grills for compound wall @ 45 Kg/each ( 2.5 x1.35m) 1 x 2 45.00 Kg/each 90.00 Kg 88.05 1 Kg
Sub- Total for Compound wall - A
B Path ways
12 BLD-CSTN-2-1 (9): Earth work excavation and depositing on bank for all lifts
and with an initial lead of 10m including all operational, incidental, labour
charges such as shoring ,sheeting, planking, strutting, etc. complete for
finished item of work including seigniorage excluding dewatering charges etc
as per SS - 20 B (APSS 308). Data- Bld -
3
a For Walking Track/ Path ways
Length of path ways-
for sectioning and levelling the ground for Pathways 1 x 1 160.00 2.00 0.200 64.00
for kerbing walls on both sides of the path ways 1 x 2 160.00 0.30 0.150 14.40
Total Qty 78.40 Cum 210.92 1 Cum
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
13 RBR-TSRA-29 : Cast in Situ Cement Concrete M20 Kerb: Construction of
cement concrete kerb with top and bottom width 115 and 165 mm
respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150
mm thick, foundation having 50 mm projection beyond kerb stone, kerb
stone laid with kerb laying machine, foundation concrete laid manually, all
complete as per clause 408 MORTH data-
parks-22
for Kerbing of Pathways 1 x 2 160.00 320.00
320.00 Rmt 286.24 1 Rmt
14 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating
each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310) Data- Bld -
10
For levelling the track between walls 1 x 1 160.00 2.00 0.100 32.00
32.00 Cum 910.40 1 Cum
15 BLD-CSTN-3-6 ( 23 ) -Hand mixing up to Plinth Level : Plain Cement
concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse
aggregate ) using 40mm size Hard Granite Machine Crushed Metal including
cost and conveyance of all materials like cement, sand, coarse aggregate
water etc., to site , seigniorage charges on all materials, labour charges ,
for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface
to the required level curing etc., complete for finished item of work.for
foundation and under flooring bed. Data- Bld -
15
a For levelling the walking track between walls 1 x 1 160.00 2.00 0.100 32.00
Total Qty 32.00 Cum 3726.65 1 Cum
16 RBR-CCPV-13 - ii: Providing and Laying of Interlocking Concrete Block
Pavements using PHOENIX or equivalent high strength Cement Concrete
interlocking Regular Pavers of 50 mm thickness of M- 40 Grade of which top
12 mm thick shall be for colour pigmentation with imported colours and
white cement to get required reflective glazing inclusive of all taxes - as per
drawing and Technical Specification Clause 1504 MORD Data- Bld -
124
a For Walking Track/ Path ways 1 x 1 160.00 2.00 320.00
Total Qty 320.00 Sqm 570.70 1 Sqm
Sub- Total for Path ways -B
C Greenary & Play Area
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
17 RBR-STCL-2 : Clearing and grubbing road land including uprooting wild
vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm,
removal of stumps of such trees cut earlier and disposal of unserviceable
materials and stacking of serviceable material to be used or auctioned, upto
a lead of 1000 m including removal and disposal of top organic soil not
exceeding 150 mm in thickness as per Technical Specification Clause 201
MORD / MORTH.
for clearing the site ( Area as o\per Drawing) 1 x 1 1600.00 1600.0 Sqm 22.92 10 Sqm
18 RBR-EECD-5 : ii: Excavation for roadway in soil by mechanical means
including cutting and pushing the earth to site of embankment upto a
distance of 100 m, including trimming bottom and side slopes in accordance
with requirements of lines, grades and cross-sections as per Technical
Specification Clause 302.3 MORD / 301 MORTH.
1 x 1 1600.00 0.250 400.00 Cum 46.65 1 Cum
19 Based on Item No.2 of HMDA (FSR), Pg.31 - FISCUE / SHADE GRASS
(Dibbling) : Making lawns by Dressing the surface to the desired shape,
laying 6" layer of fine red soil, covered with a thin layer of sand watering,
rolling with hand roller (4" thckness after rolling), including the cost of red
earth, sand and labour charges and the cost of fertlizers, chemical and grass
etc,. complete as per standard practice. Data -Parks
- 22
Area as per Drawing 1 x 1 1600.00
1600.00 Sqm 385.15 1 Sqm
20 Based on Item No.6.a of HMDA (FSR), Pg.31 -Ground Covers : Bed
preparation 6" layer of soil mixture 3:1:1 ratio red soil, farmyard manure and
river sand and application of fertolizers (@ 20 gms/pit/sqmt), smooth surface
as per design including cost of soil mixture, filling of the soil mixture and
internal transportation. Data -Parks
-8
Area as per Drawing 1 x 1 107.00 107.0
107.00 Rmt 280.63 1 Rmt
21 RBR-HRTC-9: Planting of trees by the road side (Avenue trees) in 0.60 m dia
holes, 1 m deep dug in the ground, mixing the soil with decayed farm
yard/sludge manure, planting the saplings, backfilling the trench, watering,
Data -Parks
fixing the tree guard and maintaining the plants for one year -9
Ornamental trees along the compound wall in side the park 1 x 60 60.00 Nos 1550.80 1 Nos
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
22 Based on Item No.3.c of HMDA (FSR), Pg.31- Hedge/shrub planting: Digging
the trench of size 15cm depth, refilling the trench with red soil including cost
of red soil and farmyard manure at 4:1 ratio internal transportation of plants
and planting the plants including the application of fertilizers and perticides Data -Parks
26
etc., (A 20 gms/pit/sqmt) complete but excluding the cost of the fertilizers @
as
20 per Drawing along
gms/pit/sqmt) the compound
and plant material wall 1 x 1 60 60.00 Rmt 264.72 1 Rmt
23 Planting Speciman plants including digging of pits 60cm. Cubes, loosening of
15cm. Bottom red soil, filling with soil with 10 kg Compost + 100 DAP per pit
staking gap filling with in two month after planting.
Golden bamboo 8” 1 x 4 4 Nos 1483.91 1 No
Fercaria 2” 1 x 4 4 Nos 2069.03 1 No
Ficus 4” (Verites). 1 x 3 3 Nos 1199.88 1 No
Bottle Bush 1 x 3 3 Nos 1313.49 1 No
Sub- Total for Greenary - C
D Children Play Area
24 BLD-CSTN-2-1 (9) : Earth work excavation for foundations and depositing on
bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308). Data- Bld -
3
for foundations of Slide and Ladder 1 x 3 0.60 0.60 0.75 0.81
for foundations of Swing Two seater 1 x 2 0.60 0.60 0.75 0.54
for foundations of Spiral Swing 1 x 1 0.75 0.75 0.75 0.42
for foundations of Sea-Saw 4 seater 1 x 1 0.75 0.75 0.75 0.42
for foundations of Merry go round 1 x 1 0.75 0.75 0.90 0.51
for Idle Park bench 6 x 4 0.45 0.45 0.45 2.19
for filling Sand 1 x 1 21.50 14.10 0.30 90.95
95.84 Cum 210.92 1 Cum
25 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating
each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310)
Filling sand - Children play area 1 x 1 21.5 14.10 0.30 90.95 Cum 910.40 1 Cum
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
26 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level :
Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate:
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work.for foundation and under flooring bed. Data- Bld -
15
for foundations of Slide and Ladder 1 x 3 0.60 0.60 0.75 0.81
for foundations of Swing Two seater 1 x 2 0.60 0.60 0.75 0.54
for foundations of Spiral Swing 1 x 1 0.75 0.75 0.75 0.42
for foundations of Sea-Saw 4 seater 1 x 1 0.75 0.75 0.75 0.42
for foundations of Merry go round 1 x 1 0.75 0.75 0.90 0.51
for Idle Park bench 6 x 4 0.45 0.45 0.45 2.19
4.89 Cum 3785.55 1 Cum
27 Providing Children play equipment of standard make including cost and
conveyance of all material and all labour charges, all operational and
incidental charges etc complete.
Slide and Ladder 8 feet 1 x 1 1 No 18083.00 1 No
Swing Two seater 1 x 1 1 No 15087.00 1 No
Spiral Swing 1 x 1 1 No 18618.00 1 No
Sea-Saw 4 seater 1 x 1 1 No 13482.00 1 No
Merry go round 1 x 2 2 No 17013.00 1 No
Providing seating area development by providing cast Iron /Cement seats
as directed by Engineer incharge etc, complete.
Idle Park bench 1 x 6 6 No 13418.00 1 No
Sub- Total for Children Play area - D
E Garden Posts with LED Lamps
28 ELEC-13.2.2 : Fabrication and Supply of M.S. Poles for garden posts with 'B' ele ssr-7-
class 6 mtrs long 60.25mm outer dia with base plate and suitable pole cap 10-1 d
including cost and conveyance of all material including fixing of luminaire and
labour charges etc., complete. 6Mtrs 'B' Class M.S. pipe of 60.25mm dia with
base plate and suitable pole cap
Along the Path ways as per requirement 1 x 5 5 Nos #REF! 1 each
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
29 Supply and fixing of 50mm dia 0.5 mtrs single arm M.S. pipe bracket with
sleeve and fasteners with necessary angle including painting etc., complete
on existing pole including fixing of luminaire.
1 x 5 5 Nos #REF! 1 each
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
30 13.4.6 : Erection charges for 6Mtrs. Long MS / GI Garden post including
excavation of pit, concreting 1:3:6 and painting including cost and
conveyance of all materials including fixing of luminaire and labour charges
etc., complete.
Along the Path ways as per requirement 1 x 5 5 Nos #REF! 1 each
31 Supply and fixing of 300mm x 180mm x 140mm No.16 gauge CRCA sheet
box with hinged door and locking arrangements and din channel for fixing
2Nos MCBs duly powder coated with matching colour of poles including
fixing with necessary arrangments etc., complete.
1 x 5 5 Nos #REF! 1 each
32 Supply and fixing of 6-32A 10KA DP MCB, C/D Curve ISI Mark of make
Legrand / Schneider.
1 x 5 5 Nos #REF! 1 each
33 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain
Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of Data- Bld -
work with nomonal reinforcement Pi r2 d 18
a for Coping of Lamp post above GL 1 x 5 3.14 0.04 0.45 0.28 Cum 5044.84 1 Cum
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
34 ELEC-3.11.1: Supply and transportation of ......... LED Street light Body ele ssr-3-9-
made of high grade pressure die – cast Aluminum alloy with corrosion 15
resistant powder coat, having protective toughened glass cover, Less Glare,
IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66)
protected, universal Voltage 100 - 270 V AC, P.F, ≥ 0.90, high power LED's
having efficacy ≥130 lumens/watt, and junction temperature < 75°C, with
Ingress protection IP66, Driver surge protection 4KV, with optics distribution
Type II medium, THD<10% at 110 Volts AC, driver efficiency ≥90%, CCT:
5600K, minimum CRI≥80, Inbuilt Electrical protections like Over voltage,
short circuit, Over load, Open Circuit, Miswiring, Intelligent pole mounting
option provides flexibility of vertical or horizontal pole mounting option
complete, with Top Openable Maintenance and Manufacture has to submit
LM79,LM80 & Photobiological Safety Report. Luminaire Performance
Complies to IS10322 (Part 5/Sec 3) & IEC 60598-1,IEC 60529 and ISO
certified company. LUMINAIRE MAKE : PHILIPS / OSRAM / GE /
CROMPTON / BAJAJ / SCHREDER / VIN / HALONIX / HAVELLS / HPL.
LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG /
LG LEDs.
Along the Path ways as per requirement 1 x 5 5.00 Nos #REF! 1 each
35 BLD-ELEC-3-1-4 : Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C.
insulated flexible copper cable in existing pipe for mains inlcuding all labour
charges etc., complete.
1 x 5 5.00 25.00 Rmt #REF! 1 Rmt
36 BLD-ELEC-3-1-2 : Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C.
insulated flexible copper cable in existing pipe for earth continuity including
all labour charges etc., complete.
1 x 5 5.00 25.00 Rmt #REF! 1 Rmt
37 ELEC-4.1.3 : Supply of 6 Sqmm 2 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part -
I) of Makes : Torrent / Universal / Unicab / Polycab / Havells / Gloster / KEI
Under ground Cable connecting all poles and extra for pole to panel 1 x 5 40.00 200.00 Rmt #REF! 1 Rmt
38 ELEC-4.1.5 : Supply of 10 Sqmm 4 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part -
I) of Makes : Torrent / Universal / Unicab / Polycab / Havells / Gloster / KEI.
from Panel to incomming 1 x 1 30.00 30.00 Rmt #REF! 1 Rmt
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
39 ELEC-15.6.1 : Earth work excavation of Trench in hard ground soil, laying of
U.G cables upto 50 Sq,mm on sand cushion covering the cable with bricks
and back filling of Trench duly providing route indicator embedded in C.C
including cost and conveyance of materials and labour charges etc.,
complete.
for under ground Cabling 1 x 5 30.00 150.00 Rmt #REF! 1 Rmt
40 Supply, Transportation, fabrication and erection of following guage CRCA
sheet steel enclosure for power control cubicle panel / boxes etc., including
cutting, bending drilling, welding and reveting etc., complete with cleaning
with 7 tank process and painting with powder coating including cost and
conveyance of all materials and labour charges.
1 No of 0.9m x 1.20m size Box 1 x 1 1.200 0.900 1.08 Sqm #REF! 1 Sqm
41 BLD-ELEC-4-1-3: Supply and erection of Panel mounting cubical type ( 100
to 250A ) TPN 415V, 50 Hz. switch disconnector fuse unit complete with front
drive mechanism with door inter lock, padlocking arrangement etc., complete
with fuse links on existing control panel.
1 x 1 1.00 Nos #REF! 1 each
42 BLD-ELEC-4-3-3: Supply and erection of Panel mounting 125A, 4 Pole,
25kA, MCCB with thermal magnetic setting / Microprocessor based release
arrangement with all connections etc., complete on existing panel.
1 x 1 1.00 Nos #REF! 1 each
43 ELEC-3.5.1: Supply of Automatic Street Light Control System with Optical
Sensor, Low volatage / High voltage trip and reset, operating voltage 150 -
280V AC, 50 HZ with suitable SMC enclousure of IP 54 protection, MCBs
and contactor suitable to control the load of 3 KW of single phase load with
necessary clamping arrangements. Makes : Swadeep Nature Switch / Light
Mate.
1 x 1 1.00 Nos #REF! 1 each
44 BLD-ELEC-5-1-1 : Providing independent earthling by excavating a trench to
a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm
dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume
pipe ring duly providing staggered holes including filling with equal
proportion of Salt and Charcoal in layers and all labour charges etc.,
complete for small quarters.
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
45 Water fall Type fountain: (FRP) location :to be located on the two supporting
stone masanry pillars for projected height of 20 feet & width 10 feet with MS
angle for load bearing and water turf (over head tank) to be fabricated in
stainless steel size 8 ft lenght x 3 ft width x 3 ft. height and duly connected
with flexible pipe/GI pipe from the bottom collection & commisioning etc,.
including all civil works etc,. complete.
Amount
1687.00
1893.00
3861.00
Amount
5393.00
3055.00
4887.00
10410.00
Amount
8842.00
2623.00
1318.00
Amount
7067.00
7925.00
58961.00
16536.13
Amount
91597.00
29132.80
119252.80
182624.00
439142.73
Amount
3667.20
18660.00
616240.00
30027.41
93048.00
Amount
15883.20
5935.64
8276.12
3599.64
3940.47
776950.48
20214.57
82800.88
Amount
18511.34
18083.00
15087.00
18618.00
13482.00
34026.00
80508.00
301330.79
#REF!
Amount
#REF!
Amount
#REF!
#REF!
#REF!
1413.00
Amount
#REF!
#REF!
#REF!
#REF!
#REF!
Amount
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Amount
200000.00
#REF!
GENERAL ABSTRACT
Sub-Total. A Rs.
2 Add VAT @ 5%
4 Provision towards QC @ 1%
Sub-Total. B Rs.
Say Rs.
r Amrut
Amount in Rs.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Page 1846 of 2191
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
4 BLD-CSTN-3-13- ( 30 ) - A- Nominal mix: RCC M- 20 Nominal mix
(Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS
456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and
its fabrication charges for finished item of work, but including centering and
shuttering charges for FOUNDATIONS, PLINTH, PEDESTALS
a Footings for Main Gate pillars 1 x 2 1.30 1.30 0.20 0.68 Cum 7930.76 1 Cum
b Pedastals for Gate pillars 1 x 2 0.45 0.45 0.90 0.36 Cum 8484.75 1 Cum
5 BLD-CSTN-3-13- ( 30 ) - B- Nominal mix: RCC M- 20 Nominal mix
(Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS
456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and
its fabrication charges for finished item of work, but including centering and
shuttering charges for COLUMNS, LINTELS, WATER TANKS, RCC WALLS
IN BUILDINGS - WOODEN SCAFFOLDING
for Gate pillars 1 x 2 0.30 0.30 2.70 0.49 Cum 9973.53 1 Cum
6 BLD-CSTN-6-12-(67) : Construction of RR Masonary in Cement Mortor
( 1:8 ) Prop using hard granite stone including cost & Conveyance of all
materials like Cement, Sand , Water, Granite Stones, including Seigniorage
Charges on all Materials, ,labour charges for cutting Stones to required size
and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges
curing etc., complete for finished item of Work .
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
7 BLD-CSTN-6-5-(60) : Construction of CRS Masonary 1st Sort in Cement
Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of
all materials like Cement, Sand , Water, Granite Stones, labour charges for
cutting Stones to required size and shape, mixing of Cement Mortor,
Construction, Scaffolding Charges curing etc., complete for finished item of
Work .
Compound Wall Front side excluding gate 1 x 1 6.00 0.45 0.60 1.62
for pillars for fixing MS grills in front side at every 3.00m C/C 1 x 3 0.45 0.45 1.50 0.91
Deduction for CRS pillars from wall -1 x 3 0.45 0.45 0.60 -0.36
Net Qty 2.17 Cum 4074.46 1 Cum
8 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level
Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work with nomonal reinforcement
Over CRS Walls in front side for fixing the Grills (0.15+0.2)/2 2 x 2 3.00 0.225 0.175 0.47
Over CRS Pillars in front side 1 x 3 0.45 0.45 0.075 0.05
0.52 Cum 5044.84 1 Cum
9 BLD-CSTN-7-1-(72) : Providing flush Cement Pointing to CRS Masonary in
Cement Mortor (1:3) Prop . for including cost & conveyance of all materials
to site , seignaiorage charges on all materials, labour charges on all
materials, curing etc., Complete for finished item of work
Both sides of CRS walls
Compound Wall Front side excluding gate 1 x 2 6.00 0.60 7.20
for pillars for fixing MS grills in front side at every 3.00m C/C 3 x 4 0.45 1.50 8.10
15.30 Sqm 86.17 1 Sqm
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
10 BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/
Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe
500 grade as per IS 1786-1979) of different diameters for RCC works ,
including labour charges for straightening, cutting, bending to required sizes
and shapes, placing in position with cover blocks of approved materials and
size and tying and lap-splicing with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and drawings, including cost
and conveyance of steel bars, including all wastages such as overlaps,
couplings, chairs, spacer bars including cost and conveyance of binding
wire, cover blocks and all incidental, operational, labour charges such as
cutting, bending, placing in position, tying including sales and other taxes on
all materials etc., complete for finished item of work in all floors.( APSS
No.126
For Footing & Pedastals 1.04 Cum 40.00 Kg/Cum 41.60
For Columns 0.49 Cum 125.00 Kg/Cum 61.25
102.85 Kg 68.71 1 Kg
11 Supplying and fixing of MS Grills as per Drawings including fixing with 4 Nos
of MS Z holdfasts (2 on each side) duly making cutting masonry, fixing and
making to original surface neatly and painting gate with one coat of red oxide
primer including cost and conveyance of all materials,Locking arrangment,
Ornamental pieces etc ,cutting, bending, welding including all operational
charges and all labour charges etc., complete for finished item of work.
MS Grills for compound wall @ 45 Kg/each ( 2.5 x1.35m) 1 x 2 45.00 Kg/each 90.00 Kg 88.05 1 Kg
Sub- Total for Compound wall - A
B Path ways
12 BLD-CSTN-2-1 (9): Earth work excavation and depositing on bank for all lifts
and with an initial lead of 10m including all operational, incidental, labour
charges such as shoring ,sheeting, planking, strutting, etc. complete for
finished item of work including seigniorage excluding dewatering charges etc
as per SS - 20 B (APSS 308). Data- Bld -
3
a For Walking Track/ Path ways
Length of path ways-
for sectioning and levelling the ground for Pathways 1 x 1 135.00 2.00 0.200 54.00
for kerbing walls on both sides of the path ways 1 x 2 135.00 0.30 0.150 12.15
Total Qty 66.15 Cum 210.92 1 Cum
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
13 RBR-TSRA-29 : Cast in Situ Cement Concrete M20 Kerb: Construction of
cement concrete kerb with top and bottom width 115 and 165 mm
respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150
mm thick, foundation having 50 mm projection beyond kerb stone, kerb
stone laid with kerb laying machine, foundation concrete laid manually, all
complete as per clause 408 MORTH data-
parks-22
for Kerbing of Pathways 1 x 2 135.00 270.00
270.00 Rmt 286.24 1 Rmt
14 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating
each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310) Data- Bld -
10
For levelling the track between walls 1 x 1 135.00 2.00 0.100 27.00
27.00 Cum 910.40 1 Cum
15 BLD-CSTN-3-6 ( 23 ) -Hand mixing up to Plinth Level : Plain Cement
concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse
aggregate ) using 40mm size Hard Granite Machine Crushed Metal including
cost and conveyance of all materials like cement, sand, coarse aggregate
water etc., to site , seigniorage charges on all materials, labour charges ,
for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface
to the required level curing etc., complete for finished item of work.for
foundation and under flooring bed. Data- Bld -
15
a For levelling the walking track between walls 1 x 1 135.00 2.00 0.100 27.00
Total Qty 27.00 Cum 3726.65 1 Cum
16 RBR-CCPV-13 - ii: Providing and Laying of Interlocking Concrete Block
Pavements using PHOENIX or equivalent high strength Cement Concrete
interlocking Regular Pavers of 50 mm thickness of M- 40 Grade of which top
12 mm thick shall be for colour pigmentation with imported colours and
white cement to get required reflective glazing inclusive of all taxes - as per
drawing and Technical Specification Clause 1504 MORD Data- Bld -
124
a For Walking Track/ Path ways 1 x 1 135.00 2.00 270.00
Total Qty 270.00 Sqm 570.70 1 Sqm
Sub- Total for Path ways -B
C Greenary & Play Area
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
17 RBR-STCL-2 : Clearing and grubbing road land including uprooting wild
vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm,
removal of stumps of such trees cut earlier and disposal of unserviceable
materials and stacking of serviceable material to be used or auctioned, upto
a lead of 1000 m including removal and disposal of top organic soil not
exceeding 150 mm in thickness as per Technical Specification Clause 201
MORD / MORTH.
for clearing the site ( Area as o\per Drawing) 1 x 1 720.00 720.0 Sqm 22.92 10 Sqm
18 RBR-EECD-5 : ii: Excavation for roadway in soil by mechanical means
including cutting and pushing the earth to site of embankment upto a
distance of 100 m, including trimming bottom and side slopes in accordance
with requirements of lines, grades and cross-sections as per Technical
Specification Clause 302.3 MORD / 301 MORTH.
1 x 1 720.00 0.250 180.00 Cum 46.65 1 Cum
19 Based on Item No.2 of HMDA (FSR), Pg.31 - FISCUE / SHADE GRASS
(Dibbling) : Making lawns by Dressing the surface to the desired shape,
laying 6" layer of fine red soil, covered with a thin layer of sand watering,
rolling with hand roller (4" thckness after rolling), including the cost of red
earth, sand and labour charges and the cost of fertlizers, chemical and grass
etc,. complete as per standard practice. Data -Parks
- 22
Area as per Drawing 1 x 1 720.00
720.00 Sqm 385.15 1 Sqm
20 Based on Item No.6.a of HMDA (FSR), Pg.31 -Ground Covers : Bed
preparation 6" layer of soil mixture 3:1:1 ratio red soil, farmyard manure and
river sand and application of fertolizers (@ 20 gms/pit/sqmt), smooth surface
as per design including cost of soil mixture, filling of the soil mixture and
internal transportation. Data -Parks
-8
Area as per Drawing 1 x 1 48.00 48.0
48.00 Rmt 280.63 1 Rmt
21 RBR-HRTC-9: Planting of trees by the road side (Avenue trees) in 0.60 m dia
holes, 1 m deep dug in the ground, mixing the soil with decayed farm
yard/sludge manure, planting the saplings, backfilling the trench, watering,
Data -Parks
fixing the tree guard and maintaining the plants for one year -9
Ornamental trees along the compound wall in side the park 1 x 41 41.00 Nos 1550.80 1 Nos
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
22 Based on Item No.3.c of HMDA (FSR), Pg.31- Hedge/shrub planting: Digging
the trench of size 15cm depth, refilling the trench with red soil including cost
of red soil and farmyard manure at 4:1 ratio internal transportation of plants
and planting the plants including the application of fertilizers and perticides Data -Parks
26
etc., (A 20 gms/pit/sqmt) complete but excluding the cost of the fertilizers @
as
20 per Drawing along
gms/pit/sqmt) the compound
and plant material wall 1 x 1 41 41.00 Rmt 264.72 1 Rmt
23 Planting Speciman plants including digging of pits 60cm. Cubes, loosening of
15cm. Bottom red soil, filling with soil with 10 kg Compost + 100 DAP per pit
staking gap filling with in two month after planting.
Golden bamboo 8” 1 x 4 4 Nos 1483.91 1 No
Fercaria 2” 1 x 4 4 Nos 2069.03 1 No
Ficus 4” (Verites). 1 x 3 3 Nos 1199.88 1 No
Bottle Bush 1 x 3 3 Nos 1313.49 1 No
Sub- Total for Greenary - C
D Children Play Area
24 BLD-CSTN-2-1 (9) : Earth work excavation for foundations and depositing on
bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308). Data- Bld -
3
for foundations of Slide and Ladder 1 x 3 0.60 0.60 0.75 0.81
for foundations of Swing Two seater 1 x 2 0.60 0.60 0.75 0.54
for foundations of Spiral Swing 1 x 1 0.75 0.75 0.75 0.42
for foundations of Sea-Saw 4 seater 1 x 1 0.75 0.75 0.75 0.42
for foundations of Merry go round 1 x 1 0.75 0.75 0.90 0.51
for Idle Park bench 6 x 4 0.45 0.45 0.45 2.19
for filling Sand 1 x 1 21.50 14.10 0.30 90.95
95.84 Cum 210.92 1 Cum
25 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating
each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310)
Filling sand - Children play area 1 x 1 21.5 14.10 0.30 90.95 Cum 910.40 1 Cum
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
26 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level :
Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate:
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work.for foundation and under flooring bed. Data- Bld -
15
for foundations of Slide and Ladder 1 x 3 0.60 0.60 0.75 0.81
for foundations of Swing Two seater 1 x 2 0.60 0.60 0.75 0.54
for foundations of Spiral Swing 1 x 1 0.75 0.75 0.75 0.42
for foundations of Sea-Saw 4 seater 1 x 1 0.75 0.75 0.75 0.42
for foundations of Merry go round 1 x 1 0.75 0.75 0.90 0.51
for Idle Park bench 6 x 4 0.45 0.45 0.45 2.19
4.89 Cum 3785.55 1 Cum
27 Providing Children play equipment of standard make including cost and
conveyance of all material and all labour charges, all operational and
incidental charges etc complete.
Slide and Ladder 8 feet 1 x 1 1 No 18083.00 1 No
Swing Two seater 1 x 1 1 No 15087.00 1 No
Spiral Swing 1 x 1 1 No 18618.00 1 No
Sea-Saw 4 seater 1 x 1 1 No 13482.00 1 No
Merry go round 1 x 2 2 No 17013.00 1 No
Providing seating area development by providing cast Iron /Cement seats
as directed by Engineer incharge etc, complete.
Idle Park bench 1 x 6 6 No 13418.00 1 No
Sub- Total for Children Play area - D
E Garden Posts with LED Lamps
28 ELEC-13.2.2 : Fabrication and Supply of M.S. Poles for garden posts with 'B' ele ssr-7-
class 6 mtrs long 60.25mm outer dia with base plate and suitable pole cap 10-1 d
including cost and conveyance of all material including fixing of luminaire and
labour charges etc., complete. 6Mtrs 'B' Class M.S. pipe of 60.25mm dia with
base plate and suitable pole cap
Along the Path ways as per requirement 1 x 5 5 Nos #REF! 1 each
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
29 Supply and fixing of 50mm dia 0.5 mtrs single arm M.S. pipe bracket with
sleeve and fasteners with necessary angle including painting etc., complete
on existing pole including fixing of luminaire.
1 x 5 5 Nos #REF! 1 each
30 13.4.6 : Erection charges for 6Mtrs. Long MS / GI Garden post including
excavation of pit, concreting 1:3:6 and painting including cost and
conveyance of all materials including fixing of luminaire and labour charges
etc., complete.
Along the Path ways as per requirement 1 x 5 5 Nos #REF! 1 each
31 Supply and fixing of 300mm x 180mm x 140mm No.16 gauge CRCA sheet
box with hinged door and locking arrangements and din channel for fixing
2Nos MCBs duly powder coated with matching colour of poles including
fixing with necessary arrangments etc., complete.
1 x 5 5 Nos #REF! 1 each
32 Supply and fixing of 6-32A 10KA DP MCB, C/D Curve ISI Mark of make
Legrand / Schneider.
1 x 5 5 Nos #REF! 1 each
33 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain
Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of Data- Bld -
work with nomonal reinforcement Pi r2 d 18
a for Coping of Lamp post above GL 1 x 5 3.14 0.04 0.45 0.28 Cum 5044.84 1 Cum
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
34 ELEC-3.11.1: Supply and transportation of ......... LED Street light Body ele ssr-3-9-
made of high grade pressure die – cast Aluminum alloy with corrosion 15
resistant powder coat, having protective toughened glass cover, Less Glare,
IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66)
protected, universal Voltage 100 - 270 V AC, P.F, ≥ 0.90, high power LED's
having efficacy ≥130 lumens/watt, and junction temperature < 75°C, with
Ingress protection IP66, Driver surge protection 4KV, with optics distribution
Type II medium, THD<10% at 110 Volts AC, driver efficiency ≥90%, CCT:
5600K, minimum CRI≥80, Inbuilt Electrical protections like Over voltage,
short circuit, Over load, Open Circuit, Miswiring, Intelligent pole mounting
option provides flexibility of vertical or horizontal pole mounting option
complete, with Top Openable Maintenance and Manufacture has to submit
LM79,LM80 & Photobiological Safety Report. Luminaire Performance
Complies to IS10322 (Part 5/Sec 3) & IEC 60598-1,IEC 60529 and ISO
certified company. LUMINAIRE MAKE : PHILIPS / OSRAM / GE /
CROMPTON / BAJAJ / SCHREDER / VIN / HALONIX / HAVELLS / HPL.
LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG /
LG LEDs.
Along the Path ways as per requirement 1 x 5 5.00 Nos #REF! 1 each
35 BLD-ELEC-3-1-4 : Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C.
insulated flexible copper cable in existing pipe for mains inlcuding all labour
charges etc., complete.
1 x 5 5.00 25.00 Rmt #REF! 1 Rmt
36 BLD-ELEC-3-1-2 : Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C.
insulated flexible copper cable in existing pipe for earth continuity including
all labour charges etc., complete.
1 x 5 5.00 25.00 Rmt #REF! 1 Rmt
37 ELEC-4.1.3 : Supply of 6 Sqmm 2 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part -
I) of Makes : Torrent / Universal / Unicab / Polycab / Havells / Gloster / KEI
Under ground Cable connecting all poles and extra for pole to panel 1 x 5 40.00 200.00 Rmt #REF! 1 Rmt
38 ELEC-4.1.5 : Supply of 10 Sqmm 4 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part -
I) of Makes : Torrent / Universal / Unicab / Polycab / Havells / Gloster / KEI.
from Panel to incomming 1 x 1 30.00 30.00 Rmt #REF! 1 Rmt
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
39 ELEC-15.6.1 : Earth work excavation of Trench in hard ground soil, laying of
U.G cables upto 50 Sq,mm on sand cushion covering the cable with bricks
and back filling of Trench duly providing route indicator embedded in C.C
including cost and conveyance of materials and labour charges etc.,
complete.
for under ground Cabling 1 x 5 30.00 150.00 Rmt #REF! 1 Rmt
40 Supply, Transportation, fabrication and erection of following guage CRCA
sheet steel enclosure for power control cubicle panel / boxes etc., including
cutting, bending drilling, welding and reveting etc., complete with cleaning
with 7 tank process and painting with powder coating including cost and
conveyance of all materials and labour charges.
1 No of 0.9m x 1.20m size Box 1 x 1 1.200 0.900 1.08 Sqm #REF! 1 Sqm
41 BLD-ELEC-4-1-3: Supply and erection of Panel mounting cubical type ( 100
to 250A ) TPN 415V, 50 Hz. switch disconnector fuse unit complete with front
drive mechanism with door inter lock, padlocking arrangement etc., complete
with fuse links on existing control panel.
1 x 1 1.00 Nos #REF! 1 each
42 BLD-ELEC-4-3-3: Supply and erection of Panel mounting 125A, 4 Pole,
25kA, MCCB with thermal magnetic setting / Microprocessor based release
arrangement with all connections etc., complete on existing panel.
1 x 1 1.00 Nos #REF! 1 each
43 ELEC-3.5.1: Supply of Automatic Street Light Control System with Optical
Sensor, Low volatage / High voltage trip and reset, operating voltage 150 -
280V AC, 50 HZ with suitable SMC enclousure of IP 54 protection, MCBs
and contactor suitable to control the load of 3 KW of single phase load with
necessary clamping arrangements. Makes : Swadeep Nature Switch / Light
Mate.
1 x 1 1.00 Nos #REF! 1 each
44 BLD-ELEC-5-1-1 : Providing independent earthling by excavating a trench to
a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm
dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume
pipe ring duly providing staggered holes including filling with equal
proportion of Salt and Charcoal in layers and all labour charges etc.,
complete for small quarters.
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
45 Water fall Type fountain: (FRP) location :to be located on the two supporting
stone masanry pillars for projected height of 20 feet & width 10 feet with MS
angle for load bearing and water turf (over head tank) to be fabricated in
stainless steel size 8 ft lenght x 3 ft width x 3 ft. height and duly connected
with flexible pipe/GI pipe from the bottom collection & commisioning etc,.
including all civil works etc,. complete.
Amount
1687.00
1893.00
3861.00
Amount
5393.00
3055.00
4887.00
10410.00
Amount
8842.00
2623.00
1318.00
Amount
7067.00
7925.00
58961.00
13952.36
Amount
77285.00
24580.80
100619.55
154089.00
370526.71
Amount
1650.24
8397.00
277308.00
13470.24
63582.80
Amount
10853.52
5935.64
8276.12
3599.64
3940.47
386966.43
20214.57
82800.88
Amount
18511.34
18083.00
15087.00
18618.00
13482.00
34026.00
80508.00
301330.79
#REF!
Amount
#REF!
#REF!
#REF!
#REF!
1413.00
Amount
#REF!
#REF!
#REF!
#REF!
#REF!
Amount
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Amount
200000.00
#REF!
GENERAL ABSTRACT
Sub-Total. A Rs.
2 Add VAT @ 5%
4 Provision towards QC @ 1%
Sub-Total. B Rs.
Say Rs.
r Amrut
Amount in Rs.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Page 1872 of 2191
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
4 BLD-CSTN-3-13- ( 30 ) - A- Nominal mix: RCC M- 20 Nominal mix
(Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS
456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and
its fabrication charges for finished item of work, but including centering and
shuttering charges for FOUNDATIONS, PLINTH, PEDESTALS
a Footings for Main Gate pillars 1 x 2 1.30 1.30 0.20 0.68 Cum 7930.76 1 Cum
b Pedastals for Gate pillars 1 x 2 0.45 0.45 0.90 0.36 Cum 8484.75 1 Cum
5 BLD-CSTN-3-13- ( 30 ) - B- Nominal mix: RCC M- 20 Nominal mix
(Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS
456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and
its fabrication charges for finished item of work, but including centering and
shuttering charges for COLUMNS, LINTELS, WATER TANKS, RCC WALLS
IN BUILDINGS - WOODEN SCAFFOLDING
for Gate pillars 1 x 2 0.30 0.30 2.70 0.49 Cum 9973.53 1 Cum
6 BLD-CSTN-6-12-(67) : Construction of RR Masonary in Cement Mortor
( 1:8 ) Prop using hard granite stone including cost & Conveyance of all
materials like Cement, Sand , Water, Granite Stones, including Seigniorage
Charges on all Materials, ,labour charges for cutting Stones to required size
and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges
curing etc., complete for finished item of Work .
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
7 BLD-CSTN-6-5-(60) : Construction of CRS Masonary 1st Sort in Cement
Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of
all materials like Cement, Sand , Water, Granite Stones, labour charges for
cutting Stones to required size and shape, mixing of Cement Mortor,
Construction, Scaffolding Charges curing etc., complete for finished item of
Work .
Compound Wall Front side excluding gate 1 x 1 6.00 0.45 0.60 1.62
for pillars for fixing MS grills in front side at every 3.00m C/C 1 x 3 0.45 0.45 1.50 0.91
Deduction for CRS pillars from wall -1 x 3 0.45 0.45 0.60 -0.36
Net Qty 2.17 Cum 4074.46 1 Cum
8 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level
Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work with nomonal reinforcement
Over CRS Walls in front side for fixing the Grills (0.15+0.2)/2 2 x 2 3.00 0.225 0.175 0.47
Over CRS Pillars in front side 1 x 3 0.45 0.45 0.075 0.05
0.52 Cum 5044.84 1 Cum
9 BLD-CSTN-7-1-(72) : Providing flush Cement Pointing to CRS Masonary in
Cement Mortor (1:3) Prop . for including cost & conveyance of all materials
to site , seignaiorage charges on all materials, labour charges on all
materials, curing etc., Complete for finished item of work
Both sides of CRS walls
Compound Wall Front side excluding gate 1 x 2 6.00 0.60 7.20
for pillars for fixing MS grills in front side at every 3.00m C/C 3 x 4 0.45 1.50 8.10
15.30 Sqm 86.17 1 Sqm
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
10 BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/
Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe
500 grade as per IS 1786-1979) of different diameters for RCC works ,
including labour charges for straightening, cutting, bending to required sizes
and shapes, placing in position with cover blocks of approved materials and
size and tying and lap-splicing with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and drawings, including cost
and conveyance of steel bars, including all wastages such as overlaps,
couplings, chairs, spacer bars including cost and conveyance of binding
wire, cover blocks and all incidental, operational, labour charges such as
cutting, bending, placing in position, tying including sales and other taxes on
all materials etc., complete for finished item of work in all floors.( APSS
No.126
For Footing & Pedastals 1.04 Cum 40.00 Kg/Cum 41.60
For Columns 0.49 Cum 125.00 Kg/Cum 61.25
102.85 Kg 68.71 1 Kg
11 Supplying and fixing of MS Grills as per Drawings including fixing with 4 Nos
of MS Z holdfasts (2 on each side) duly making cutting masonry, fixing and
making to original surface neatly and painting gate with one coat of red oxide
primer including cost and conveyance of all materials,Locking arrangment,
Ornamental pieces etc ,cutting, bending, welding including all operational
charges and all labour charges etc., complete for finished item of work.
MS Grills for compound wall @ 45 Kg/each ( 2.5 x1.35m) 1 x 2 45.00 Kg/each 90.00 Kg 88.05 1 Kg
Sub- Total for Compound wall - A
B Path ways
12 BLD-CSTN-2-1 (9): Earth work excavation and depositing on bank for all lifts
and with an initial lead of 10m including all operational, incidental, labour
charges such as shoring ,sheeting, planking, strutting, etc. complete for
finished item of work including seigniorage excluding dewatering charges etc
as per SS - 20 B (APSS 308). Data- Bld -
3
a For Walking Track/ Path ways
Length of path ways-
for sectioning and levelling the ground for Pathways 1 x 1 54.00 2.00 0.200 21.60
for kerbing walls on both sides of the path ways 1 x 2 54.00 0.30 0.150 4.86
Total Qty 26.46 Cum 210.92 1 Cum
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
13 RBR-TSRA-29 : Cast in Situ Cement Concrete M20 Kerb: Construction of
cement concrete kerb with top and bottom width 115 and 165 mm
respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150
mm thick, foundation having 50 mm projection beyond kerb stone, kerb
stone laid with kerb laying machine, foundation concrete laid manually, all
complete as per clause 408 MORTH data-
parks-22
for Kerbing of Pathways 1 x 2 54.00 108.00
108.00 Rmt 286.24 1 Rmt
14 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating
each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310) Data- Bld -
10
For levelling the track between walls 1 x 1 54.00 2.00 0.100 10.80
10.80 Cum 910.40 1 Cum
15 BLD-CSTN-3-6 ( 23 ) -Hand mixing up to Plinth Level : Plain Cement
concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse
aggregate ) using 40mm size Hard Granite Machine Crushed Metal including
cost and conveyance of all materials like cement, sand, coarse aggregate
water etc., to site , seigniorage charges on all materials, labour charges ,
for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface
to the required level curing etc., complete for finished item of work.for
foundation and under flooring bed. Data- Bld -
15
a For levelling the walking track between walls 1 x 1 54.00 2.00 0.100 10.80
Total Qty 10.80 Cum 3726.65 1 Cum
16 RBR-CCPV-13 - ii: Providing and Laying of Interlocking Concrete Block
Pavements using PHOENIX or equivalent high strength Cement Concrete
interlocking Regular Pavers of 50 mm thickness of M- 40 Grade of which top
12 mm thick shall be for colour pigmentation with imported colours and
white cement to get required reflective glazing inclusive of all taxes - as per
drawing and Technical Specification Clause 1504 MORD Data- Bld -
124
a For Walking Track/ Path ways 1 x 1 54.00 2.00 108.00
Total Qty 108.00 Sqm 570.70 1 Sqm
Sub- Total for Path ways -B
C Greenary & Play Area
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
17 RBR-STCL-2 : Clearing and grubbing road land including uprooting wild
vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm,
removal of stumps of such trees cut earlier and disposal of unserviceable
materials and stacking of serviceable material to be used or auctioned, upto
a lead of 1000 m including removal and disposal of top organic soil not
exceeding 150 mm in thickness as per Technical Specification Clause 201
MORD / MORTH.
for clearing the site ( Area as o\per Drawing) 1 x 1 210.00 210.0 Sqm 22.92 10 Sqm
18 RBR-EECD-5 : ii: Excavation for roadway in soil by mechanical means
including cutting and pushing the earth to site of embankment upto a
distance of 100 m, including trimming bottom and side slopes in accordance
with requirements of lines, grades and cross-sections as per Technical
Specification Clause 302.3 MORD / 301 MORTH.
1 x 1 210.00 0.250 52.50 Cum 46.65 1 Cum
19 Based on Item No.2 of HMDA (FSR), Pg.31 - FISCUE / SHADE GRASS
(Dibbling) : Making lawns by Dressing the surface to the desired shape,
laying 6" layer of fine red soil, covered with a thin layer of sand watering,
rolling with hand roller (4" thckness after rolling), including the cost of red
earth, sand and labour charges and the cost of fertlizers, chemical and grass
etc,. complete as per standard practice. Data -Parks
- 22
Area as per Drawing 1 x 1 210.00
210.00 Sqm 385.15 1 Sqm
20 Based on Item No.6.a of HMDA (FSR), Pg.31 -Ground Covers : Bed
preparation 6" layer of soil mixture 3:1:1 ratio red soil, farmyard manure and
river sand and application of fertolizers (@ 20 gms/pit/sqmt), smooth surface
as per design including cost of soil mixture, filling of the soil mixture and
internal transportation. Data -Parks
-8
Area as per Drawing 1 x 1 14.00 14.0
14.00 Rmt 280.63 1 Rmt
21 RBR-HRTC-9: Planting of trees by the road side (Avenue trees) in 0.60 m dia
holes, 1 m deep dug in the ground, mixing the soil with decayed farm
yard/sludge manure, planting the saplings, backfilling the trench, watering,
Data -Parks
fixing the tree guard and maintaining the plants for one year -9
Ornamental trees along the compound wall in side the park 1 x 21 21.00 Nos 1550.80 1 Nos
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
22 Based on Item No.3.c of HMDA (FSR), Pg.31- Hedge/shrub planting: Digging
the trench of size 15cm depth, refilling the trench with red soil including cost
of red soil and farmyard manure at 4:1 ratio internal transportation of plants
and planting the plants including the application of fertilizers and perticides Data -Parks
26
etc., (A 20 gms/pit/sqmt) complete but excluding the cost of the fertilizers @
as
20 per Drawing along
gms/pit/sqmt) the compound
and plant material wall 1 x 1 21 21.00 Rmt 264.72 1 Rmt
23 Planting Speciman plants including digging of pits 60cm. Cubes, loosening of
15cm. Bottom red soil, filling with soil with 10 kg Compost + 100 DAP per pit
staking gap filling with in two month after planting.
Golden bamboo 8” 1 x 4 4 Nos 1483.91 1 No
Fercaria 2” 1 x 4 4 Nos 2069.03 1 No
Ficus 4” (Verites). 1 x 3 3 Nos 1199.88 1 No
Bottle Bush 1 x 3 3 Nos 1313.49 1 No
Sub- Total for Greenary - C
D Children Play Area
24 BLD-CSTN-2-1 (9) : Earth work excavation for foundations and depositing on
bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308). Data- Bld -
3
for foundations of Slide and Ladder 0 x 3 0.60 0.60 0.75 0.00
for foundations of Swing Two seater 0 x 2 0.60 0.60 0.75 0.00
for foundations of Spiral Swing 0 x 1 0.75 0.75 0.75 0.00
for foundations of Sea-Saw 4 seater 1 x 1 0.75 0.75 0.75 0.42
for foundations of Merry go round 1 x 1 0.75 0.75 0.90 0.51
for Idle Park bench 6 x 4 0.45 0.45 0.45 2.19
for filling Sand 1 x 1 21.50 14.10 0.30 90.95
94.07 Cum 210.92 1 Cum
25 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating
each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310)
Filling sand - Children play area 1 x 1 21.5 14.10 0.30 90.95 Cum 910.40 1 Cum
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
26 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level :
Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate:
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work.for foundation and under flooring bed. Data- Bld -
15
for foundations of Slide and Ladder 0 x 3 0.60 0.60 0.75 0.00
for foundations of Swing Two seater 0 x 2 0.60 0.60 0.75 0.00
for foundations of Spiral Swing 0 x 1 0.75 0.75 0.75 0.00
for foundations of Sea-Saw 4 seater 1 x 1 0.75 0.75 0.75 0.42
for foundations of Merry go round 1 x 1 0.75 0.75 0.90 0.51
for Idle Park bench 6 x 4 0.45 0.45 0.45 2.19
3.12 Cum 3785.55 1 Cum
27 Providing Children play equipment of standard make including cost and
conveyance of all material and all labour charges, all operational and
incidental charges etc complete.
Slide and Ladder 8 feet 0 x 1 0 No 18083.00 1 No
Swing Two seater 0 x 1 0 No 15087.00 1 No
Spiral Swing 0 x 1 0 No 18618.00 1 No
Sea-Saw 4 seater 1 x 1 1 No 13482.00 1 No
Merry go round 1 x 2 2 No 17013.00 1 No
Providing seating area development by providing cast Iron /Cement seats
as directed by Engineer incharge etc, complete.
Idle Park bench 1 x 6 6 No 13418.00 1 No
Sub- Total for Children Play area - D
E Garden Posts with LED Lamps
28 ELEC-13.2.2 : Fabrication and Supply of M.S. Poles for garden posts with 'B' ele ssr-7-
class 6 mtrs long 60.25mm outer dia with base plate and suitable pole cap 10-1 d
including cost and conveyance of all material including fixing of luminaire and
labour charges etc., complete. 6Mtrs 'B' Class M.S. pipe of 60.25mm dia with
base plate and suitable pole cap
Along the Path ways as per requirement 1 x 2 2 Nos #REF! 1 each
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
29 Supply and fixing of 50mm dia 0.5 mtrs single arm M.S. pipe bracket with
sleeve and fasteners with necessary angle including painting etc., complete
on existing pole including fixing of luminaire.
1 x 2 2 Nos #REF! 1 each
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
30 13.4.6 : Erection charges for 6Mtrs. Long MS / GI Garden post including
excavation of pit, concreting 1:3:6 and painting including cost and
conveyance of all materials including fixing of luminaire and labour charges
etc., complete.
Along the Path ways as per requirement 1 x 2 2 Nos #REF! 1 each
31 Supply and fixing of 300mm x 180mm x 140mm No.16 gauge CRCA sheet
box with hinged door and locking arrangements and din channel for fixing
2Nos MCBs duly powder coated with matching colour of poles including
fixing with necessary arrangments etc., complete.
1 x 2 2 Nos #REF! 1 each
32 Supply and fixing of 6-32A 10KA DP MCB, C/D Curve ISI Mark of make
Legrand / Schneider.
1 x 2 2 Nos #REF! 1 each
33 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain
Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of Data- Bld -
work with nomonal reinforcement Pi r2 d 18
a for Coping of Lamp post above GL 1 x 2 3.14 0.04 0.45 0.11 Cum 5044.84 1 Cum
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
34 ELEC-3.11.1: Supply and transportation of ......... LED Street light Body ele ssr-3-9-
made of high grade pressure die – cast Aluminum alloy with corrosion 15
resistant powder coat, having protective toughened glass cover, Less Glare,
IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66)
protected, universal Voltage 100 - 270 V AC, P.F, ≥ 0.90, high power LED's
having efficacy ≥130 lumens/watt, and junction temperature < 75°C, with
Ingress protection IP66, Driver surge protection 4KV, with optics distribution
Type II medium, THD<10% at 110 Volts AC, driver efficiency ≥90%, CCT:
5600K, minimum CRI≥80, Inbuilt Electrical protections like Over voltage,
short circuit, Over load, Open Circuit, Miswiring, Intelligent pole mounting
option provides flexibility of vertical or horizontal pole mounting option
complete, with Top Openable Maintenance and Manufacture has to submit
LM79,LM80 & Photobiological Safety Report. Luminaire Performance
Complies to IS10322 (Part 5/Sec 3) & IEC 60598-1,IEC 60529 and ISO
certified company. LUMINAIRE MAKE : PHILIPS / OSRAM / GE /
CROMPTON / BAJAJ / SCHREDER / VIN / HALONIX / HAVELLS / HPL.
LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG /
LG LEDs.
Along the Path ways as per requirement 1 x 2 2.00 Nos #REF! 1 each
35 BLD-ELEC-3-1-4 : Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C.
insulated flexible copper cable in existing pipe for mains inlcuding all labour
charges etc., complete.
1 x 2 5.00 10.00 Rmt #REF! 1 Rmt
36 BLD-ELEC-3-1-2 : Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C.
insulated flexible copper cable in existing pipe for earth continuity including
all labour charges etc., complete.
1 x 2 5.00 10.00 Rmt #REF! 1 Rmt
37 ELEC-4.1.3 : Supply of 6 Sqmm 2 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part -
I) of Makes : Torrent / Universal / Unicab / Polycab / Havells / Gloster / KEI
Under ground Cable connecting all poles and extra for pole to panel 1 x 2 40.00 80.00 Rmt #REF! 1 Rmt
38 ELEC-4.1.5 : Supply of 10 Sqmm 4 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part -
I) of Makes : Torrent / Universal / Unicab / Polycab / Havells / Gloster / KEI.
from Panel to incomming 1 x 1 30.00 30.00 Rmt #REF! 1 Rmt
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
39 ELEC-15.6.1 : Earth work excavation of Trench in hard ground soil, laying of
U.G cables upto 50 Sq,mm on sand cushion covering the cable with bricks
and back filling of Trench duly providing route indicator embedded in C.C
including cost and conveyance of materials and labour charges etc.,
complete.
for under ground Cabling 1 x 2 30.00 60.00 Rmt #REF! 1 Rmt
40 Supply, Transportation, fabrication and erection of following guage CRCA
sheet steel enclosure for power control cubicle panel / boxes etc., including
cutting, bending drilling, welding and reveting etc., complete with cleaning
with 7 tank process and painting with powder coating including cost and
conveyance of all materials and labour charges.
1 No of 0.9m x 1.20m size Box 1 x 1 1.200 0.900 1.08 Sqm #REF! 1 Sqm
41 BLD-ELEC-4-1-3: Supply and erection of Panel mounting cubical type ( 100
to 250A ) TPN 415V, 50 Hz. switch disconnector fuse unit complete with front
drive mechanism with door inter lock, padlocking arrangement etc., complete
with fuse links on existing control panel.
1 x 1 1.00 Nos #REF! 1 each
42 BLD-ELEC-4-3-3: Supply and erection of Panel mounting 125A, 4 Pole,
25kA, MCCB with thermal magnetic setting / Microprocessor based release
arrangement with all connections etc., complete on existing panel.
1 x 1 1.00 Nos #REF! 1 each
43 ELEC-3.5.1: Supply of Automatic Street Light Control System with Optical
Sensor, Low volatage / High voltage trip and reset, operating voltage 150 -
280V AC, 50 HZ with suitable SMC enclousure of IP 54 protection, MCBs
and contactor suitable to control the load of 3 KW of single phase load with
necessary clamping arrangements. Makes : Swadeep Nature Switch / Light
Mate.
1 x 1 1.00 Nos #REF! 1 each
44 BLD-ELEC-5-1-1 : Providing independent earthling by excavating a trench to
a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm
dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume
pipe ring duly providing staggered holes including filling with equal
proportion of Salt and Charcoal in layers and all labour charges etc.,
complete for small quarters.
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
45 Water fall Type fountain: (FRP) location :to be located on the two supporting
stone masanry pillars for projected height of 20 feet & width 10 feet with MS
angle for load bearing and water turf (over head tank) to be fabricated in
stainless steel size 8 ft lenght x 3 ft width x 3 ft. height and duly connected
with flexible pipe/GI pipe from the bottom collection & commisioning etc,.
including all civil works etc,. complete.
Amount
1687.00
1893.00
3861.00
Amount
5393.00
3055.00
4887.00
10410.00
Amount
8842.00
2623.00
1318.00
Amount
7067.00
7925.00
58961.00
5580.94
Amount
30914.00
9832.32
40247.82
61635.60
148210.68
Amount
481.32
2449.13
80881.50
3928.82
32566.80
Amount
5559.12
5935.64
8276.12
3599.64
3940.47
144688.11
19841.24
82800.88
Amount
11810.92
0.00
0.00
0.00
13482.00
34026.00
80508.00
242469.04
#REF!
Amount
#REF!
Amount
#REF!
#REF!
#REF!
555.00
Amount
#REF!
#REF!
#REF!
#REF!
#REF!
Amount
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Amount
200000.00
#REF!
GENERAL ABSTRACT
Sub-Total. A Rs.
2 Add VAT @ 5%
4 Provision towards QC @ 1%
Sub-Total. B Rs.
Say Rs.
r Amrut
Amount in Rs.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Page 1900 of 2191
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
4 BLD-CSTN-3-13- ( 30 ) - A- Nominal mix: RCC M- 20 Nominal mix
(Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS
456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and
its fabrication charges for finished item of work, but including centering and
shuttering charges for FOUNDATIONS, PLINTH, PEDESTALS
a Footings for Main Gate pillars 1 x 2 1.30 1.30 0.20 0.68 Cum 7930.76 1 Cum
b Pedastals for Gate pillars 1 x 2 0.45 0.45 0.90 0.36 Cum 8484.75 1 Cum
5 BLD-CSTN-3-13- ( 30 ) - B- Nominal mix: RCC M- 20 Nominal mix
(Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS
456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and
its fabrication charges for finished item of work, but including centering and
shuttering charges for COLUMNS, LINTELS, WATER TANKS, RCC WALLS
IN BUILDINGS - WOODEN SCAFFOLDING
for Gate pillars 1 x 2 0.30 0.30 2.70 0.49 Cum 9973.53 1 Cum
6 BLD-CSTN-6-12-(67) : Construction of RR Masonary in Cement Mortor
( 1:8 ) Prop using hard granite stone including cost & Conveyance of all
materials like Cement, Sand , Water, Granite Stones, including Seigniorage
Charges on all Materials, ,labour charges for cutting Stones to required size
and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges
curing etc., complete for finished item of Work .
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
7 BLD-CSTN-6-5-(60) : Construction of CRS Masonary 1st Sort in Cement
Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of
all materials like Cement, Sand , Water, Granite Stones, labour charges for
cutting Stones to required size and shape, mixing of Cement Mortor,
Construction, Scaffolding Charges curing etc., complete for finished item of
Work .
Compound Wall Front side excluding gate 1 x 1 6.00 0.45 0.60 1.62
for pillars for fixing MS grills in front side at every 3.00m C/C 1 x 3 0.45 0.45 1.50 0.91
Deduction for CRS pillars from wall -1 x 3 0.45 0.45 0.60 -0.36
Net Qty 2.17 Cum 4074.46 1 Cum
8 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level
Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work with nomonal reinforcement
Over CRS Walls in front side for fixing the Grills (0.15+0.2)/2 2 x 2 3.00 0.225 0.175 0.47
Over CRS Pillars in front side 1 x 3 0.45 0.45 0.075 0.05
0.52 Cum 5044.84 1 Cum
9 BLD-CSTN-7-1-(72) : Providing flush Cement Pointing to CRS Masonary in
Cement Mortor (1:3) Prop . for including cost & conveyance of all materials
to site , seignaiorage charges on all materials, labour charges on all
materials, curing etc., Complete for finished item of work
Both sides of CRS walls
Compound Wall Front side excluding gate 1 x 2 6.00 0.60 7.20
for pillars for fixing MS grills in front side at every 3.00m C/C 3 x 4 0.45 1.50 8.10
15.30 Sqm 86.17 1 Sqm
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
10 BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/
Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe
500 grade as per IS 1786-1979) of different diameters for RCC works ,
including labour charges for straightening, cutting, bending to required sizes
and shapes, placing in position with cover blocks of approved materials and
size and tying and lap-splicing with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and drawings, including cost
and conveyance of steel bars, including all wastages such as overlaps,
couplings, chairs, spacer bars including cost and conveyance of binding
wire, cover blocks and all incidental, operational, labour charges such as
cutting, bending, placing in position, tying including sales and other taxes on
all materials etc., complete for finished item of work in all floors.( APSS
No.126
For Footing & Pedastals 1.04 Cum 40.00 Kg/Cum 41.60
For Columns 0.49 Cum 125.00 Kg/Cum 61.25
102.85 Kg 68.71 1 Kg
11 Supplying and fixing of MS Grills as per Drawings including fixing with 4 Nos
of MS Z holdfasts (2 on each side) duly making cutting masonry, fixing and
making to original surface neatly and painting gate with one coat of red oxide
primer including cost and conveyance of all materials,Locking arrangment,
Ornamental pieces etc ,cutting, bending, welding including all operational
charges and all labour charges etc., complete for finished item of work.
MS Grills for compound wall @ 45 Kg/each ( 2.5 x1.35m) 1 x 2 45.00 Kg/each 90.00 Kg 88.05 1 Kg
Sub- Total for Compound wall - A
B Path ways
12 BLD-CSTN-2-1 (9): Earth work excavation and depositing on bank for all lifts
and with an initial lead of 10m including all operational, incidental, labour
charges such as shoring ,sheeting, planking, strutting, etc. complete for
finished item of work including seigniorage excluding dewatering charges etc
as per SS - 20 B (APSS 308). Data- Bld -
3
a For Walking Track/ Path ways
Length of path ways-
for sectioning and levelling the ground for Pathways 1 x 1 185.00 2.00 0.200 74.00
for kerbing walls on both sides of the path ways 1 x 2 185.00 0.30 0.150 16.65
Total Qty 90.65 Cum 210.92 1 Cum
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
13 RBR-TSRA-29 : Cast in Situ Cement Concrete M20 Kerb: Construction of
cement concrete kerb with top and bottom width 115 and 165 mm
respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150
mm thick, foundation having 50 mm projection beyond kerb stone, kerb
stone laid with kerb laying machine, foundation concrete laid manually, all
complete as per clause 408 MORTH data-
parks-22
for Kerbing of Pathways 1 x 2 185.00 370.00
370.00 Rmt 286.24 1 Rmt
14 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating
each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310) Data- Bld -
10
For levelling the track between walls 1 x 1 185.00 2.00 0.100 37.00
37.00 Cum 910.40 1 Cum
15 BLD-CSTN-3-6 ( 23 ) -Hand mixing up to Plinth Level : Plain Cement
concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse
aggregate ) using 40mm size Hard Granite Machine Crushed Metal including
cost and conveyance of all materials like cement, sand, coarse aggregate
water etc., to site , seigniorage charges on all materials, labour charges ,
for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface
to the required level curing etc., complete for finished item of work.for
foundation and under flooring bed. Data- Bld -
15
a For levelling the walking track between walls 1 x 1 185.00 2.00 0.100 37.00
Total Qty 37.00 Cum 3726.65 1 Cum
16 RBR-CCPV-13 - ii: Providing and Laying of Interlocking Concrete Block
Pavements using PHOENIX or equivalent high strength Cement Concrete
interlocking Regular Pavers of 50 mm thickness of M- 40 Grade of which top
12 mm thick shall be for colour pigmentation with imported colours and
white cement to get required reflective glazing inclusive of all taxes - as per
drawing and Technical Specification Clause 1504 MORD Data- Bld -
124
a For Walking Track/ Path ways 1 x 1 185.00 2.00 370.00
Total Qty 370.00 Sqm 570.70 1 Sqm
Sub- Total for Path ways -B
C Greenary & Play Area
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
17 RBR-STCL-2 : Clearing and grubbing road land including uprooting wild
vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm,
removal of stumps of such trees cut earlier and disposal of unserviceable
materials and stacking of serviceable material to be used or auctioned, upto
a lead of 1000 m including removal and disposal of top organic soil not
exceeding 150 mm in thickness as per Technical Specification Clause 201
MORD / MORTH.
for clearing the site ( Area as o\per Drawing) 1 x 1 1753.00 1753.0 Sqm 22.92 10 Sqm
18 RBR-EECD-5 : ii: Excavation for roadway in soil by mechanical means
including cutting and pushing the earth to site of embankment upto a
distance of 100 m, including trimming bottom and side slopes in accordance
with requirements of lines, grades and cross-sections as per Technical
Specification Clause 302.3 MORD / 301 MORTH.
1 x 1 1753.00 0.250 438.25 Cum 46.65 1 Cum
19 Based on Item No.2 of HMDA (FSR), Pg.31 - FISCUE / SHADE GRASS
(Dibbling) : Making lawns by Dressing the surface to the desired shape,
laying 6" layer of fine red soil, covered with a thin layer of sand watering,
rolling with hand roller (4" thckness after rolling), including the cost of red
earth, sand and labour charges and the cost of fertlizers, chemical and grass
etc,. complete as per standard practice. Data -Parks
- 22
Area as per Drawing 1 x 1 1753.00
1753.00 Sqm 385.15 1 Sqm
20 Based on Item No.6.a of HMDA (FSR), Pg.31 -Ground Covers : Bed
preparation 6" layer of soil mixture 3:1:1 ratio red soil, farmyard manure and
river sand and application of fertolizers (@ 20 gms/pit/sqmt), smooth surface
as per design including cost of soil mixture, filling of the soil mixture and
internal transportation. Data -Parks
-8
Area as per Drawing 1 x 1 117.00 117.0
117.00 Rmt 280.63 1 Rmt
21 RBR-HRTC-9: Planting of trees by the road side (Avenue trees) in 0.60 m dia
holes, 1 m deep dug in the ground, mixing the soil with decayed farm
yard/sludge manure, planting the saplings, backfilling the trench, watering,
Data -Parks
fixing the tree guard and maintaining the plants for one year -9
Ornamental trees along the compound wall in side the park 1 x 63 63.00 Nos 1550.80 1 Nos
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
22 Based on Item No.3.c of HMDA (FSR), Pg.31- Hedge/shrub planting: Digging
the trench of size 15cm depth, refilling the trench with red soil including cost
of red soil and farmyard manure at 4:1 ratio internal transportation of plants
and planting the plants including the application of fertilizers and perticides Data -Parks
26
etc., (A 20 gms/pit/sqmt) complete but excluding the cost of the fertilizers @
as
20 per Drawing along
gms/pit/sqmt) the compound
and plant material wall 1 x 1 63 63.00 Rmt 264.72 1 Rmt
23 Planting Speciman plants including digging of pits 60cm. Cubes, loosening of
15cm. Bottom red soil, filling with soil with 10 kg Compost + 100 DAP per pit
staking gap filling with in two month after planting.
Golden bamboo 8” 1 x 4 4 Nos 1483.91 1 No
Fercaria 2” 1 x 4 4 Nos 2069.03 1 No
Ficus 4” (Verites). 1 x 3 3 Nos 1199.88 1 No
Bottle Bush 1 x 3 3 Nos 1313.49 1 No
Sub- Total for Greenary - C
D Children Play Area
24 BLD-CSTN-2-1 (9) : Earth work excavation for foundations and depositing on
bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308). Data- Bld -
3
for foundations of Slide and Ladder 1 x 3 0.60 0.60 0.75 0.81
for foundations of Swing Two seater 1 x 2 0.60 0.60 0.75 0.54
for foundations of Spiral Swing 1 x 1 0.75 0.75 0.75 0.42
for foundations of Sea-Saw 4 seater 1 x 1 0.75 0.75 0.75 0.42
for foundations of Merry go round 1 x 1 0.75 0.75 0.90 0.51
for Idle Park bench 6 x 4 0.45 0.45 0.45 2.19
for filling Sand 1 x 1 21.50 14.10 0.30 90.95
95.84 Cum 210.92 1 Cum
25 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating
each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310)
Filling sand - Children play area 1 x 1 21.5 14.10 0.30 90.95 Cum 910.40 1 Cum
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
26 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level :
Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate:
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work.for foundation and under flooring bed. Data- Bld -
15
for foundations of Slide and Ladder 1 x 3 0.60 0.60 0.75 0.81
for foundations of Swing Two seater 1 x 2 0.60 0.60 0.75 0.54
for foundations of Spiral Swing 1 x 1 0.75 0.75 0.75 0.42
for foundations of Sea-Saw 4 seater 1 x 1 0.75 0.75 0.75 0.42
for foundations of Merry go round 1 x 1 0.75 0.75 0.90 0.51
for Idle Park bench 6 x 4 0.45 0.45 0.45 2.19
4.89 Cum 3785.55 1 Cum
27 Providing Children play equipment of standard make including cost and
conveyance of all material and all labour charges, all operational and
incidental charges etc complete.
Slide and Ladder 8 feet 1 x 1 1 No 18083.00 1 No
Swing Two seater 1 x 1 1 No 15087.00 1 No
Spiral Swing 1 x 1 1 No 18618.00 1 No
Sea-Saw 4 seater 1 x 1 1 No 13482.00 1 No
Merry go round 1 x 2 2 No 17013.00 1 No
Providing seating area development by providing cast Iron /Cement seats
as directed by Engineer incharge etc, complete.
Idle Park bench 1 x 6 6 No 13418.00 1 No
Sub- Total for Children Play area - D
E Garden Posts with LED Lamps
28 ELEC-13.2.2 : Fabrication and Supply of M.S. Poles for garden posts with 'B' ele ssr-7-
class 6 mtrs long 60.25mm outer dia with base plate and suitable pole cap 10-1 d
including cost and conveyance of all material including fixing of luminaire and
labour charges etc., complete. 6Mtrs 'B' Class M.S. pipe of 60.25mm dia with
base plate and suitable pole cap
Along the Path ways as per requirement 1 x 6 6 Nos #REF! 1 each
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
29 Supply and fixing of 50mm dia 0.5 mtrs single arm M.S. pipe bracket with
sleeve and fasteners with necessary angle including painting etc., complete
on existing pole including fixing of luminaire.
1 x 6 6 Nos #REF! 1 each
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
30 13.4.6 : Erection charges for 6Mtrs. Long MS / GI Garden post including
excavation of pit, concreting 1:3:6 and painting including cost and
conveyance of all materials including fixing of luminaire and labour charges
etc., complete.
Along the Path ways as per requirement 1 x 6 6 Nos #REF! 1 each
31 Supply and fixing of 300mm x 180mm x 140mm No.16 gauge CRCA sheet
box with hinged door and locking arrangements and din channel for fixing
2Nos MCBs duly powder coated with matching colour of poles including
fixing with necessary arrangments etc., complete.
1 x 6 6 Nos #REF! 1 each
32 Supply and fixing of 6-32A 10KA DP MCB, C/D Curve ISI Mark of make
Legrand / Schneider.
1 x 6 6 Nos #REF! 1 each
33 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain
Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of Data- Bld -
work with nomonal reinforcement Pi r2 d 18
a for Coping of Lamp post above GL 1 x 6 3.14 0.04 0.45 0.34 Cum 5044.84 1 Cum
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
34 ELEC-3.11.1: Supply and transportation of ......... LED Street light Body ele ssr-3-9-
made of high grade pressure die – cast Aluminum alloy with corrosion 15
resistant powder coat, having protective toughened glass cover, Less Glare,
IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66)
protected, universal Voltage 100 - 270 V AC, P.F, ≥ 0.90, high power LED's
having efficacy ≥130 lumens/watt, and junction temperature < 75°C, with
Ingress protection IP66, Driver surge protection 4KV, with optics distribution
Type II medium, THD<10% at 110 Volts AC, driver efficiency ≥90%, CCT:
5600K, minimum CRI≥80, Inbuilt Electrical protections like Over voltage,
short circuit, Over load, Open Circuit, Miswiring, Intelligent pole mounting
option provides flexibility of vertical or horizontal pole mounting option
complete, with Top Openable Maintenance and Manufacture has to submit
LM79,LM80 & Photobiological Safety Report. Luminaire Performance
Complies to IS10322 (Part 5/Sec 3) & IEC 60598-1,IEC 60529 and ISO
certified company. LUMINAIRE MAKE : PHILIPS / OSRAM / GE /
CROMPTON / BAJAJ / SCHREDER / VIN / HALONIX / HAVELLS / HPL.
LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG /
LG LEDs.
Along the Path ways as per requirement 1 x 6 6.00 Nos #REF! 1 each
35 BLD-ELEC-3-1-4 : Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C.
insulated flexible copper cable in existing pipe for mains inlcuding all labour
charges etc., complete.
1 x 6 5.00 30.00 Rmt #REF! 1 Rmt
36 BLD-ELEC-3-1-2 : Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C.
insulated flexible copper cable in existing pipe for earth continuity including
all labour charges etc., complete.
1 x 6 5.00 30.00 Rmt #REF! 1 Rmt
37 ELEC-4.1.3 : Supply of 6 Sqmm 2 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part -
I) of Makes : Torrent / Universal / Unicab / Polycab / Havells / Gloster / KEI
Under ground Cable connecting all poles and extra for pole to panel 1 x 6 40.00 240.00 Rmt #REF! 1 Rmt
38 ELEC-4.1.5 : Supply of 10 Sqmm 4 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part -
I) of Makes : Torrent / Universal / Unicab / Polycab / Havells / Gloster / KEI.
from Panel to incomming 1 x 1 30.00 30.00 Rmt #REF! 1 Rmt
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
39 ELEC-15.6.1 : Earth work excavation of Trench in hard ground soil, laying of
U.G cables upto 50 Sq,mm on sand cushion covering the cable with bricks
and back filling of Trench duly providing route indicator embedded in C.C
including cost and conveyance of materials and labour charges etc.,
complete.
for under ground Cabling 1 x 6 30.00 180.00 Rmt #REF! 1 Rmt
40 Supply, Transportation, fabrication and erection of following guage CRCA
sheet steel enclosure for power control cubicle panel / boxes etc., including
cutting, bending drilling, welding and reveting etc., complete with cleaning
with 7 tank process and painting with powder coating including cost and
conveyance of all materials and labour charges.
1 No of 0.9m x 1.20m size Box 1 x 1 1.200 0.900 1.08 Sqm #REF! 1 Sqm
41 BLD-ELEC-4-1-3: Supply and erection of Panel mounting cubical type ( 100
to 250A ) TPN 415V, 50 Hz. switch disconnector fuse unit complete with front
drive mechanism with door inter lock, padlocking arrangement etc., complete
with fuse links on existing control panel.
1 x 1 1.00 Nos #REF! 1 each
42 BLD-ELEC-4-3-3: Supply and erection of Panel mounting 125A, 4 Pole,
25kA, MCCB with thermal magnetic setting / Microprocessor based release
arrangement with all connections etc., complete on existing panel.
1 x 1 1.00 Nos #REF! 1 each
43 ELEC-3.5.1: Supply of Automatic Street Light Control System with Optical
Sensor, Low volatage / High voltage trip and reset, operating voltage 150 -
280V AC, 50 HZ with suitable SMC enclousure of IP 54 protection, MCBs
and contactor suitable to control the load of 3 KW of single phase load with
necessary clamping arrangements. Makes : Swadeep Nature Switch / Light
Mate.
1 x 1 1.00 Nos #REF! 1 each
44 BLD-ELEC-5-1-1 : Providing independent earthling by excavating a trench to
a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm
dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume
pipe ring duly providing staggered holes including filling with equal
proportion of Salt and Charcoal in layers and all labour charges etc.,
complete for small quarters.
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
45 Water fall Type fountain: (FRP) location :to be located on the two supporting
stone masanry pillars for projected height of 20 feet & width 10 feet with MS
angle for load bearing and water turf (over head tank) to be fabricated in
stainless steel size 8 ft lenght x 3 ft width x 3 ft. height and duly connected
with flexible pipe/GI pipe from the bottom collection & commisioning etc,.
including all civil works etc,. complete.
Amount
1687.00
1893.00
3861.00
Amount
5393.00
3055.00
4887.00
10410.00
Amount
8842.00
2623.00
1318.00
Amount
7067.00
7925.00
58961.00
19119.90
Amount
105909.00
33684.80
137886.05
211159.00
507758.75
Amount
4017.88
20444.36
675167.95
32833.71
97700.40
Amount
16677.36
5935.64
8276.12
3599.64
3940.47
844131.29
20214.57
82800.88
Amount
18511.34
18083.00
15087.00
18618.00
13482.00
34026.00
80508.00
301330.79
#REF!
Amount
#REF!
Amount
#REF!
#REF!
#REF!
1715.00
Amount
#REF!
#REF!
#REF!
#REF!
#REF!
Amount
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Amount
200000.00
#REF!
GENERAL ABSTRACT
Sub-Total. A Rs.
2 Add VAT @ 5%
4 Provision towards QC @ 1%
Sub-Total. B Rs.
Say Rs.
r Amrut
Amount in Rs.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Page 1928 of 2191
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
4 BLD-CSTN-3-13- ( 30 ) - A- Nominal mix: RCC M- 20 Nominal mix
(Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS
456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and
its fabrication charges for finished item of work, but including centering and
shuttering charges for FOUNDATIONS, PLINTH, PEDESTALS
a Footings for Main Gate pillars 1 x 2 1.30 1.30 0.20 0.68 Cum 7930.76 1 Cum
b Pedastals for Gate pillars 1 x 2 0.45 0.45 0.90 0.36 Cum 8484.75 1 Cum
5 BLD-CSTN-3-13- ( 30 ) - B- Nominal mix: RCC M- 20 Nominal mix
(Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS
456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and
its fabrication charges for finished item of work, but including centering and
shuttering charges for COLUMNS, LINTELS, WATER TANKS, RCC WALLS
IN BUILDINGS - WOODEN SCAFFOLDING
for Gate pillars 1 x 2 0.30 0.30 2.70 0.49 Cum 9973.53 1 Cum
6 BLD-CSTN-6-12-(67) : Construction of RR Masonary in Cement Mortor
( 1:8 ) Prop using hard granite stone including cost & Conveyance of all
materials like Cement, Sand , Water, Granite Stones, including Seigniorage
Charges on all Materials, ,labour charges for cutting Stones to required size
and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges
curing etc., complete for finished item of Work .
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
7 BLD-CSTN-6-5-(60) : Construction of CRS Masonary 1st Sort in Cement
Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of
all materials like Cement, Sand , Water, Granite Stones, labour charges for
cutting Stones to required size and shape, mixing of Cement Mortor,
Construction, Scaffolding Charges curing etc., complete for finished item of
Work .
Compound Wall Front side excluding gate 1 x 1 6.00 0.45 0.60 1.62
for pillars for fixing MS grills in front side at every 3.00m C/C 1 x 3 0.45 0.45 1.50 0.91
Deduction for CRS pillars from wall -1 x 3 0.45 0.45 0.60 -0.36
Net Qty 2.17 Cum 4074.46 1 Cum
8 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level
Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work with nomonal reinforcement
Over CRS Walls in front side for fixing the Grills (0.15+0.2)/2 2 x 2 3.00 0.225 0.175 0.47
Over CRS Pillars in front side 1 x 3 0.45 0.45 0.075 0.05
0.52 Cum 5044.84 1 Cum
9 BLD-CSTN-7-1-(72) : Providing flush Cement Pointing to CRS Masonary in
Cement Mortor (1:3) Prop . for including cost & conveyance of all materials
to site , seignaiorage charges on all materials, labour charges on all
materials, curing etc., Complete for finished item of work
Both sides of CRS walls
Compound Wall Front side excluding gate 1 x 2 6.00 0.60 7.20
for pillars for fixing MS grills in front side at every 3.00m C/C 3 x 4 0.45 1.50 8.10
15.30 Sqm 86.17 1 Sqm
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
10 BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/
Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe
500 grade as per IS 1786-1979) of different diameters for RCC works ,
including labour charges for straightening, cutting, bending to required sizes
and shapes, placing in position with cover blocks of approved materials and
size and tying and lap-splicing with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and drawings, including cost
and conveyance of steel bars, including all wastages such as overlaps,
couplings, chairs, spacer bars including cost and conveyance of binding
wire, cover blocks and all incidental, operational, labour charges such as
cutting, bending, placing in position, tying including sales and other taxes on
all materials etc., complete for finished item of work in all floors.( APSS
No.126
For Footing & Pedastals 1.04 Cum 40.00 Kg/Cum 41.60
For Columns 0.49 Cum 125.00 Kg/Cum 61.25
102.85 Kg 68.71 1 Kg
11 Supplying and fixing of MS Grills as per Drawings including fixing with 4 Nos
of MS Z holdfasts (2 on each side) duly making cutting masonry, fixing and
making to original surface neatly and painting gate with one coat of red oxide
primer including cost and conveyance of all materials,Locking arrangment,
Ornamental pieces etc ,cutting, bending, welding including all operational
charges and all labour charges etc., complete for finished item of work.
MS Grills for compound wall @ 45 Kg/each ( 2.5 x1.35m) 1 x 2 45.00 Kg/each 90.00 Kg 88.05 1 Kg
Sub- Total for Compound wall - A
B Path ways
12 BLD-CSTN-2-1 (9): Earth work excavation and depositing on bank for all lifts
and with an initial lead of 10m including all operational, incidental, labour
charges such as shoring ,sheeting, planking, strutting, etc. complete for
finished item of work including seigniorage excluding dewatering charges etc
as per SS - 20 B (APSS 308). Data- Bld -
3
a For Walking Track/ Path ways
Length of path ways-
for sectioning and levelling the ground for Pathways 1 x 1 330.00 2.00 0.200 132.00
for kerbing walls on both sides of the path ways 1 x 2 330.00 0.30 0.150 29.70
Total Qty 161.70 Cum 210.92 1 Cum
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
13 RBR-TSRA-29 : Cast in Situ Cement Concrete M20 Kerb: Construction of
cement concrete kerb with top and bottom width 115 and 165 mm
respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150
mm thick, foundation having 50 mm projection beyond kerb stone, kerb
stone laid with kerb laying machine, foundation concrete laid manually, all
complete as per clause 408 MORTH data-
parks-22
for Kerbing of Pathways 1 x 2 330.00 660.00
660.00 Rmt 286.24 1 Rmt
14 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating
each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310) Data- Bld -
10
For levelling the track between walls 1 x 1 330.00 2.00 0.100 66.00
66.00 Cum 910.40 1 Cum
15 BLD-CSTN-3-6 ( 23 ) -Hand mixing up to Plinth Level : Plain Cement
concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse
aggregate ) using 40mm size Hard Granite Machine Crushed Metal including
cost and conveyance of all materials like cement, sand, coarse aggregate
water etc., to site , seigniorage charges on all materials, labour charges ,
for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface
to the required level curing etc., complete for finished item of work.for
foundation and under flooring bed. Data- Bld -
15
a For levelling the walking track between walls 1 x 1 330.00 2.00 0.100 66.00
Total Qty 66.00 Cum 3726.65 1 Cum
16 RBR-CCPV-13 - ii: Providing and Laying of Interlocking Concrete Block
Pavements using PHOENIX or equivalent high strength Cement Concrete
interlocking Regular Pavers of 50 mm thickness of M- 40 Grade of which top
12 mm thick shall be for colour pigmentation with imported colours and
white cement to get required reflective glazing inclusive of all taxes - as per
drawing and Technical Specification Clause 1504 MORD Data- Bld -
124
a For Walking Track/ Path ways 1 x 1 330.00 2.00 660.00
Total Qty 660.00 Sqm 570.70 1 Sqm
Sub- Total for Path ways -B
C Greenary & Play Area
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
17 RBR-STCL-2 : Clearing and grubbing road land including uprooting wild
vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm,
removal of stumps of such trees cut earlier and disposal of unserviceable
materials and stacking of serviceable material to be used or auctioned, upto
a lead of 1000 m including removal and disposal of top organic soil not
exceeding 150 mm in thickness as per Technical Specification Clause 201
MORD / MORTH.
for clearing the site ( Area as o\per Drawing) 1 x 1 930.00 930.0 Sqm 22.92 10 Sqm
18 RBR-EECD-5 : ii: Excavation for roadway in soil by mechanical means
including cutting and pushing the earth to site of embankment upto a
distance of 100 m, including trimming bottom and side slopes in accordance
with requirements of lines, grades and cross-sections as per Technical
Specification Clause 302.3 MORD / 301 MORTH.
1 x 1 930.00 0.250 232.50 Cum 46.65 1 Cum
19 Based on Item No.2 of HMDA (FSR), Pg.31 - FISCUE / SHADE GRASS
(Dibbling) : Making lawns by Dressing the surface to the desired shape,
laying 6" layer of fine red soil, covered with a thin layer of sand watering,
rolling with hand roller (4" thckness after rolling), including the cost of red
earth, sand and labour charges and the cost of fertlizers, chemical and grass
etc,. complete as per standard practice. Data -Parks
- 22
Area as per Drawing 1 x 1 930.00
930.00 Sqm 385.15 1 Sqm
20 Based on Item No.6.a of HMDA (FSR), Pg.31 -Ground Covers : Bed
preparation 6" layer of soil mixture 3:1:1 ratio red soil, farmyard manure and
river sand and application of fertolizers (@ 20 gms/pit/sqmt), smooth surface
as per design including cost of soil mixture, filling of the soil mixture and
internal transportation. Data -Parks
-8
Area as per Drawing 1 x 1 62.00 62.0
62.00 Rmt 280.63 1 Rmt
21 RBR-HRTC-9: Planting of trees by the road side (Avenue trees) in 0.60 m dia
holes, 1 m deep dug in the ground, mixing the soil with decayed farm
yard/sludge manure, planting the saplings, backfilling the trench, watering,
Data -Parks
fixing the tree guard and maintaining the plants for one year -9
Ornamental trees along the compound wall in side the park 1 x 45 45.00 Nos 1550.80 1 Nos
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
22 Based on Item No.3.c of HMDA (FSR), Pg.31- Hedge/shrub planting: Digging
the trench of size 15cm depth, refilling the trench with red soil including cost
of red soil and farmyard manure at 4:1 ratio internal transportation of plants
and planting the plants including the application of fertilizers and perticides Data -Parks
26
etc., (A 20 gms/pit/sqmt) complete but excluding the cost of the fertilizers @
as
20 per Drawing along
gms/pit/sqmt) the compound
and plant material wall 1 x 1 45 45.00 Rmt 264.72 1 Rmt
23 Planting Speciman plants including digging of pits 60cm. Cubes, loosening of
15cm. Bottom red soil, filling with soil with 10 kg Compost + 100 DAP per pit
staking gap filling with in two month after planting.
Golden bamboo 8” 1 x 4 4 Nos 1483.91 1 No
Fercaria 2” 1 x 4 4 Nos 2069.03 1 No
Ficus 4” (Verites). 1 x 3 3 Nos 1199.88 1 No
Bottle Bush 1 x 3 3 Nos 1313.49 1 No
Sub- Total for Greenary - C
D Children Play Area
24 BLD-CSTN-2-1 (9) : Earth work excavation for foundations and depositing on
bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308). Data- Bld -
3
for foundations of Slide and Ladder 1 x 3 0.60 0.60 0.75 0.81
for foundations of Swing Two seater 1 x 2 0.60 0.60 0.75 0.54
for foundations of Spiral Swing 1 x 1 0.75 0.75 0.75 0.42
for foundations of Sea-Saw 4 seater 1 x 1 0.75 0.75 0.75 0.42
for foundations of Merry go round 1 x 1 0.75 0.75 0.90 0.51
for Idle Park bench 6 x 4 0.45 0.45 0.45 2.19
for filling Sand 1 x 1 21.50 14.10 0.30 90.95
95.84 Cum 210.92 1 Cum
25 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating
each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310)
Filling sand - Children play area 1 x 1 21.5 14.10 0.30 90.95 Cum 910.40 1 Cum
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
26 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level :
Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate:
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work.for foundation and under flooring bed. Data- Bld -
15
for foundations of Slide and Ladder 1 x 3 0.60 0.60 0.75 0.81
for foundations of Swing Two seater 1 x 2 0.60 0.60 0.75 0.54
for foundations of Spiral Swing 1 x 1 0.75 0.75 0.75 0.42
for foundations of Sea-Saw 4 seater 1 x 1 0.75 0.75 0.75 0.42
for foundations of Merry go round 1 x 1 0.75 0.75 0.90 0.51
for Idle Park bench 6 x 4 0.45 0.45 0.45 2.19
4.89 Cum 3785.55 1 Cum
27 Providing Children play equipment of standard make including cost and
conveyance of all material and all labour charges, all operational and
incidental charges etc complete.
Slide and Ladder 8 feet 1 x 1 1 No 18083.00 1 No
Swing Two seater 1 x 1 1 No 15087.00 1 No
Spiral Swing 1 x 1 1 No 18618.00 1 No
Sea-Saw 4 seater 1 x 1 1 No 13482.00 1 No
Merry go round 1 x 2 2 No 17013.00 1 No
Providing seating area development by providing cast Iron /Cement seats
as directed by Engineer incharge etc, complete.
Idle Park bench 1 x 6 6 No 13418.00 1 No
Sub- Total for Children Play area - D
E Garden Posts with LED Lamps
28 ELEC-13.2.2 : Fabrication and Supply of M.S. Poles for garden posts with 'B' ele ssr-7-
class 6 mtrs long 60.25mm outer dia with base plate and suitable pole cap 10-1 d
including cost and conveyance of all material including fixing of luminaire and
labour charges etc., complete. 6Mtrs 'B' Class M.S. pipe of 60.25mm dia with
base plate and suitable pole cap
Along the Path ways as per requirement 1 x 11 11 Nos #REF! 1 each
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
29 Supply and fixing of 50mm dia 0.5 mtrs single arm M.S. pipe bracket with
sleeve and fasteners with necessary angle including painting etc., complete
on existing pole including fixing of luminaire.
1 x 11 11 Nos #REF! 1 each
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
30 13.4.6 : Erection charges for 6Mtrs. Long MS / GI Garden post including
excavation of pit, concreting 1:3:6 and painting including cost and
conveyance of all materials including fixing of luminaire and labour charges
etc., complete.
Along the Path ways as per requirement 1 x 11 11 Nos #REF! 1 each
31 Supply and fixing of 300mm x 180mm x 140mm No.16 gauge CRCA sheet
box with hinged door and locking arrangements and din channel for fixing
2Nos MCBs duly powder coated with matching colour of poles including
fixing with necessary arrangments etc., complete.
1 x 11 11 Nos #REF! 1 each
32 Supply and fixing of 6-32A 10KA DP MCB, C/D Curve ISI Mark of make
Legrand / Schneider.
1 x 11 11 Nos #REF! 1 each
33 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain
Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of Data- Bld -
work with nomonal reinforcement Pi r2 d 18
a for Coping of Lamp post above GL 1 x 11 3.14 0.04 0.45 0.62 Cum 5044.84 1 Cum
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
34 ELEC-3.11.1: Supply and transportation of ......... LED Street light Body ele ssr-3-9-
made of high grade pressure die – cast Aluminum alloy with corrosion 15
resistant powder coat, having protective toughened glass cover, Less Glare,
IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66)
protected, universal Voltage 100 - 270 V AC, P.F, ≥ 0.90, high power LED's
having efficacy ≥130 lumens/watt, and junction temperature < 75°C, with
Ingress protection IP66, Driver surge protection 4KV, with optics distribution
Type II medium, THD<10% at 110 Volts AC, driver efficiency ≥90%, CCT:
5600K, minimum CRI≥80, Inbuilt Electrical protections like Over voltage,
short circuit, Over load, Open Circuit, Miswiring, Intelligent pole mounting
option provides flexibility of vertical or horizontal pole mounting option
complete, with Top Openable Maintenance and Manufacture has to submit
LM79,LM80 & Photobiological Safety Report. Luminaire Performance
Complies to IS10322 (Part 5/Sec 3) & IEC 60598-1,IEC 60529 and ISO
certified company. LUMINAIRE MAKE : PHILIPS / OSRAM / GE /
CROMPTON / BAJAJ / SCHREDER / VIN / HALONIX / HAVELLS / HPL.
LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG /
LG LEDs.
Along the Path ways as per requirement 1 x 11 11.00 Nos #REF! 1 each
35 BLD-ELEC-3-1-4 : Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C.
insulated flexible copper cable in existing pipe for mains inlcuding all labour
charges etc., complete.
1 x 11 5.00 55.00 Rmt #REF! 1 Rmt
36 BLD-ELEC-3-1-2 : Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C.
insulated flexible copper cable in existing pipe for earth continuity including
all labour charges etc., complete.
1 x 11 5.00 55.00 Rmt #REF! 1 Rmt
37 ELEC-4.1.3 : Supply of 6 Sqmm 2 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part -
I) of Makes : Torrent / Universal / Unicab / Polycab / Havells / Gloster / KEI
Under ground Cable connecting all poles and extra for pole to panel 1 x 11 40.00 440.00 Rmt #REF! 1 Rmt
38 ELEC-4.1.5 : Supply of 10 Sqmm 4 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part -
I) of Makes : Torrent / Universal / Unicab / Polycab / Havells / Gloster / KEI.
from Panel to incomming 1 x 1 30.00 30.00 Rmt #REF! 1 Rmt
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
39 ELEC-15.6.1 : Earth work excavation of Trench in hard ground soil, laying of
U.G cables upto 50 Sq,mm on sand cushion covering the cable with bricks
and back filling of Trench duly providing route indicator embedded in C.C
including cost and conveyance of materials and labour charges etc.,
complete.
for under ground Cabling 1 x 11 30.00 330.00 Rmt #REF! 1 Rmt
40 Supply, Transportation, fabrication and erection of following guage CRCA
sheet steel enclosure for power control cubicle panel / boxes etc., including
cutting, bending drilling, welding and reveting etc., complete with cleaning
with 7 tank process and painting with powder coating including cost and
conveyance of all materials and labour charges.
1 No of 0.9m x 1.20m size Box 1 x 1 1.200 0.900 1.08 Sqm #REF! 1 Sqm
41 BLD-ELEC-4-1-3: Supply and erection of Panel mounting cubical type ( 100
to 250A ) TPN 415V, 50 Hz. switch disconnector fuse unit complete with front
drive mechanism with door inter lock, padlocking arrangement etc., complete
with fuse links on existing control panel.
1 x 1 1.00 Nos #REF! 1 each
42 BLD-ELEC-4-3-3: Supply and erection of Panel mounting 125A, 4 Pole,
25kA, MCCB with thermal magnetic setting / Microprocessor based release
arrangement with all connections etc., complete on existing panel.
1 x 1 1.00 Nos #REF! 1 each
43 ELEC-3.5.1: Supply of Automatic Street Light Control System with Optical
Sensor, Low volatage / High voltage trip and reset, operating voltage 150 -
280V AC, 50 HZ with suitable SMC enclousure of IP 54 protection, MCBs
and contactor suitable to control the load of 3 KW of single phase load with
necessary clamping arrangements. Makes : Swadeep Nature Switch / Light
Mate.
1 x 1 1.00 Nos #REF! 1 each
44 BLD-ELEC-5-1-1 : Providing independent earthling by excavating a trench to
a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm
dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume
pipe ring duly providing staggered holes including filling with equal
proportion of Salt and Charcoal in layers and all labour charges etc.,
complete for small quarters.
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
45 Water fall Type fountain: (FRP) location :to be located on the two supporting
stone masanry pillars for projected height of 20 feet & width 10 feet with MS
angle for load bearing and water turf (over head tank) to be fabricated in
stainless steel size 8 ft lenght x 3 ft width x 3 ft. height and duly connected
with flexible pipe/GI pipe from the bottom collection & commisioning etc,.
including all civil works etc,. complete.
Amount
1687.00
1893.00
3861.00
Amount
5393.00
3055.00
4887.00
10410.00
Amount
8842.00
2623.00
1318.00
Amount
7067.00
7925.00
58961.00
34105.76
Amount
188918.00
60086.40
245958.90
376662.00
905731.06
Amount
2131.56
10846.13
358189.50
17399.06
69786.00
Amount
11912.40
5935.64
8276.12
3599.64
3940.47
479038.83
20214.57
82800.88
Amount
18511.34
18083.00
15087.00
18618.00
13482.00
34026.00
80508.00
301330.79
#REF!
Amount
#REF!
Amount
#REF!
#REF!
#REF!
3128.00
Amount
#REF!
#REF!
#REF!
#REF!
#REF!
Amount
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Amount
200000.00
#REF!
GENERAL ABSTRACT
Sub-Total. A Rs.
2 Add VAT @ 5%
4 Provision towards QC @ 1%
Sub-Total. B Rs.
Say Rs.
Amrut
Amount in Rs.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Page 1956 of 2191
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
4 BLD-CSTN-3-13- ( 30 ) - A- Nominal mix: RCC M- 20 Nominal mix
(Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS
456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and
its fabrication charges for finished item of work, but including centering and
shuttering charges for FOUNDATIONS, PLINTH, PEDESTALS
a Footings for Main Gate pillars 1 x 2 1.30 1.30 0.20 0.68 Cum 7930.76 1 Cum
b Pedastals for Gate pillars 1 x 2 0.45 0.45 0.90 0.36 Cum 8484.75 1 Cum
5 BLD-CSTN-3-13- ( 30 ) - B- Nominal mix: RCC M- 20 Nominal mix
(Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS
456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and
its fabrication charges for finished item of work, but including centering and
shuttering charges for COLUMNS, LINTELS, WATER TANKS, RCC WALLS
IN BUILDINGS - WOODEN SCAFFOLDING
for Gate pillars 1 x 2 0.30 0.30 2.70 0.49 Cum 9973.53 1 Cum
6 BLD-CSTN-6-12-(67) : Construction of RR Masonary in Cement Mortor
( 1:8 ) Prop using hard granite stone including cost & Conveyance of all
materials like Cement, Sand , Water, Granite Stones, including Seigniorage
Charges on all Materials, ,labour charges for cutting Stones to required size
and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges
curing etc., complete for finished item of Work .
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
7 BLD-CSTN-6-5-(60) : Construction of CRS Masonary 1st Sort in Cement
Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of
all materials like Cement, Sand , Water, Granite Stones, labour charges for
cutting Stones to required size and shape, mixing of Cement Mortor,
Construction, Scaffolding Charges curing etc., complete for finished item of
Work .
Compound Wall Front side excluding gate 1 x 1 6.00 0.45 0.60 1.62
for pillars for fixing MS grills in front side at every 3.00m C/C 1 x 3 0.45 0.45 1.50 0.91
Deduction for CRS pillars from wall -1 x 3 0.45 0.45 0.60 -0.36
Net Qty 2.17 Cum 4074.46 1 Cum
8 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level
Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work with nomonal reinforcement
Over CRS Walls in front side for fixing the Grills (0.15+0.2)/2 2 x 2 3.00 0.225 0.175 0.47
Over CRS Pillars in front side 1 x 3 0.45 0.45 0.075 0.05
0.52 Cum 5044.84 1 Cum
9 BLD-CSTN-7-1-(72) : Providing flush Cement Pointing to CRS Masonary in
Cement Mortor (1:3) Prop . for including cost & conveyance of all materials
to site , seignaiorage charges on all materials, labour charges on all
materials, curing etc., Complete for finished item of work
Both sides of CRS walls
Compound Wall Front side excluding gate 1 x 2 6.00 0.60 7.20
for pillars for fixing MS grills in front side at every 3.00m C/C 3 x 4 0.45 1.50 8.10
15.30 Sqm 86.17 1 Sqm
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
10 BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/
Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe
500 grade as per IS 1786-1979) of different diameters for RCC works ,
including labour charges for straightening, cutting, bending to required sizes
and shapes, placing in position with cover blocks of approved materials and
size and tying and lap-splicing with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and drawings, including cost
and conveyance of steel bars, including all wastages such as overlaps,
couplings, chairs, spacer bars including cost and conveyance of binding
wire, cover blocks and all incidental, operational, labour charges such as
cutting, bending, placing in position, tying including sales and other taxes on
all materials etc., complete for finished item of work in all floors.( APSS
No.126
For Footing & Pedastals 1.04 Cum 40.00 Kg/Cum 41.60
For Columns 0.49 Cum 125.00 Kg/Cum 61.25
102.85 Kg 68.71 1 Kg
11 Supplying and fixing of MS Grills as per Drawings including fixing with 4 Nos
of MS Z holdfasts (2 on each side) duly making cutting masonry, fixing and
making to original surface neatly and painting gate with one coat of red oxide
primer including cost and conveyance of all materials,Locking arrangment,
Ornamental pieces etc ,cutting, bending, welding including all operational
charges and all labour charges etc., complete for finished item of work.
MS Grills for compound wall @ 45 Kg/each ( 2.5 x1.35m) 1 x 2 45.00 Kg/each 90.00 Kg 88.05 1 Kg
Sub- Total for Compound wall - A
B Path ways
12 BLD-CSTN-2-1 (9): Earth work excavation and depositing on bank for all lifts
and with an initial lead of 10m including all operational, incidental, labour
charges such as shoring ,sheeting, planking, strutting, etc. complete for
finished item of work including seigniorage excluding dewatering charges etc
as per SS - 20 B (APSS 308). Data- Bld -
3
a For Walking Track/ Path ways
Length of path ways-
for sectioning and levelling the ground for Pathways 1 x 1 220.00 2.00 0.200 88.00
for kerbing walls on both sides of the path ways 1 x 2 220.00 0.30 0.150 19.80
Total Qty 107.80 Cum 210.92 1 Cum
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
13 RBR-TSRA-29 : Cast in Situ Cement Concrete M20 Kerb: Construction of
cement concrete kerb with top and bottom width 115 and 165 mm
respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150
mm thick, foundation having 50 mm projection beyond kerb stone, kerb
stone laid with kerb laying machine, foundation concrete laid manually, all
complete as per clause 408 MORTH data-
parks-22
for Kerbing of Pathways 1 x 2 220.00 440.00
440.00 Rmt 286.24 1 Rmt
14 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating
each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310) Data- Bld -
10
For levelling the track between walls 1 x 1 220.00 2.00 0.100 44.00
44.00 Cum 910.40 1 Cum
15 BLD-CSTN-3-6 ( 23 ) -Hand mixing up to Plinth Level : Plain Cement
concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse
aggregate ) using 40mm size Hard Granite Machine Crushed Metal including
cost and conveyance of all materials like cement, sand, coarse aggregate
water etc., to site , seigniorage charges on all materials, labour charges ,
for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface
to the required level curing etc., complete for finished item of work.for
foundation and under flooring bed. Data- Bld -
15
a For levelling the walking track between walls 1 x 1 220.00 2.00 0.100 44.00
Total Qty 44.00 Cum 3726.65 1 Cum
16 RBR-CCPV-13 - ii: Providing and Laying of Interlocking Concrete Block
Pavements using PHOENIX or equivalent high strength Cement Concrete
interlocking Regular Pavers of 50 mm thickness of M- 40 Grade of which top
12 mm thick shall be for colour pigmentation with imported colours and
white cement to get required reflective glazing inclusive of all taxes - as per
drawing and Technical Specification Clause 1504 MORD Data- Bld -
124
a For Walking Track/ Path ways 1 x 1 220.00 2.00 440.00
Total Qty 440.00 Sqm 570.70 1 Sqm
Sub- Total for Path ways -B
C Greenary & Play Area
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
17 RBR-STCL-2 : Clearing and grubbing road land including uprooting wild
vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm,
removal of stumps of such trees cut earlier and disposal of unserviceable
materials and stacking of serviceable material to be used or auctioned, upto
a lead of 1000 m including removal and disposal of top organic soil not
exceeding 150 mm in thickness as per Technical Specification Clause 201
MORD / MORTH.
for clearing the site ( Area as o\per Drawing) 1 x 1 750.00 750.0 Sqm 22.92 10 Sqm
18 RBR-EECD-5 : ii: Excavation for roadway in soil by mechanical means
including cutting and pushing the earth to site of embankment upto a
distance of 100 m, including trimming bottom and side slopes in accordance
with requirements of lines, grades and cross-sections as per Technical
Specification Clause 302.3 MORD / 301 MORTH.
1 x 1 750.00 0.250 187.50 Cum 46.65 1 Cum
19 Based on Item No.2 of HMDA (FSR), Pg.31 - FISCUE / SHADE GRASS
(Dibbling) : Making lawns by Dressing the surface to the desired shape,
laying 6" layer of fine red soil, covered with a thin layer of sand watering,
rolling with hand roller (4" thckness after rolling), including the cost of red
earth, sand and labour charges and the cost of fertlizers, chemical and grass
etc,. complete as per standard practice. Data -Parks
- 22
Area as per Drawing 1 x 1 750.00
750.00 Sqm 385.15 1 Sqm
20 Based on Item No.6.a of HMDA (FSR), Pg.31 -Ground Covers : Bed
preparation 6" layer of soil mixture 3:1:1 ratio red soil, farmyard manure and
river sand and application of fertolizers (@ 20 gms/pit/sqmt), smooth surface
as per design including cost of soil mixture, filling of the soil mixture and
internal transportation. Data -Parks
-8
Area as per Drawing 1 x 1 50.00 50.0
50.00 Rmt 280.63 1 Rmt
21 RBR-HRTC-9: Planting of trees by the road side (Avenue trees) in 0.60 m dia
holes, 1 m deep dug in the ground, mixing the soil with decayed farm
yard/sludge manure, planting the saplings, backfilling the trench, watering,
Data -Parks
fixing the tree guard and maintaining the plants for one year -9
Ornamental trees along the compound wall in side the park 1 x 41 41.00 Nos 1550.80 1 Nos
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
22 Based on Item No.3.c of HMDA (FSR), Pg.31- Hedge/shrub planting: Digging
the trench of size 15cm depth, refilling the trench with red soil including cost
of red soil and farmyard manure at 4:1 ratio internal transportation of plants
and planting the plants including the application of fertilizers and perticides Data -Parks
26
etc., (A 20 gms/pit/sqmt) complete but excluding the cost of the fertilizers @
as
20 per Drawing along
gms/pit/sqmt) the compound
and plant material wall 1 x 1 41 41.00 Rmt 264.72 1 Rmt
23 Planting Speciman plants including digging of pits 60cm. Cubes, loosening of
15cm. Bottom red soil, filling with soil with 10 kg Compost + 100 DAP per pit
staking gap filling with in two month after planting.
Golden bamboo 8” 1 x 4 4 Nos 1483.91 1 No
Fercaria 2” 1 x 4 4 Nos 2069.03 1 No
Ficus 4” (Verites). 1 x 3 3 Nos 1199.88 1 No
Bottle Bush 1 x 3 3 Nos 1313.49 1 No
Sub- Total for Greenary - C
D Children Play Area
24 BLD-CSTN-2-1 (9) : Earth work excavation for foundations and depositing on
bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308). Data- Bld -
3
for foundations of Slide and Ladder 1 x 3 0.60 0.60 0.75 0.81
for foundations of Swing Two seater 1 x 2 0.60 0.60 0.75 0.54
for foundations of Spiral Swing 1 x 1 0.75 0.75 0.75 0.42
for foundations of Sea-Saw 4 seater 1 x 1 0.75 0.75 0.75 0.42
for foundations of Merry go round 1 x 1 0.75 0.75 0.90 0.51
for Idle Park bench 6 x 4 0.45 0.45 0.45 2.19
for filling Sand 1 x 1 21.50 14.10 0.30 90.95
95.84 Cum 210.92 1 Cum
25 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating
each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310)
Filling sand - Children play area 1 x 1 21.5 14.10 0.30 90.95 Cum 910.40 1 Cum
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
26 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level :
Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate:
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work.for foundation and under flooring bed. Data- Bld -
15
for foundations of Slide and Ladder 1 x 3 0.60 0.60 0.75 0.81
for foundations of Swing Two seater 1 x 2 0.60 0.60 0.75 0.54
for foundations of Spiral Swing 1 x 1 0.75 0.75 0.75 0.42
for foundations of Sea-Saw 4 seater 1 x 1 0.75 0.75 0.75 0.42
for foundations of Merry go round 1 x 1 0.75 0.75 0.90 0.51
for Idle Park bench 6 x 4 0.45 0.45 0.45 2.19
4.89 Cum 3785.55 1 Cum
27 Providing Children play equipment of standard make including cost and
conveyance of all material and all labour charges, all operational and
incidental charges etc complete.
Slide and Ladder 8 feet 1 x 1 1 No 18083.00 1 No
Swing Two seater 1 x 1 1 No 15087.00 1 No
Spiral Swing 1 x 1 1 No 18618.00 1 No
Sea-Saw 4 seater 1 x 1 1 No 13482.00 1 No
Merry go round 1 x 2 2 No 17013.00 1 No
Providing seating area development by providing cast Iron /Cement seats
as directed by Engineer incharge etc, complete.
Idle Park bench 1 x 6 6 No 13418.00 1 No
Sub- Total for Children Play area - D
E Garden Posts with LED Lamps
28 ELEC-13.2.2 : Fabrication and Supply of M.S. Poles for garden posts with 'B' ele ssr-7-
class 6 mtrs long 60.25mm outer dia with base plate and suitable pole cap 10-1 d
including cost and conveyance of all material including fixing of luminaire and
labour charges etc., complete. 6Mtrs 'B' Class M.S. pipe of 60.25mm dia with
base plate and suitable pole cap
Along the Path ways as per requirement 1 x 7 7 Nos #REF! 1 each
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
29 Supply and fixing of 50mm dia 0.5 mtrs single arm M.S. pipe bracket with
sleeve and fasteners with necessary angle including painting etc., complete
on existing pole including fixing of luminaire.
1 x 7 7 Nos #REF! 1 each
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
30 13.4.6 : Erection charges for 6Mtrs. Long MS / GI Garden post including
excavation of pit, concreting 1:3:6 and painting including cost and
conveyance of all materials including fixing of luminaire and labour charges
etc., complete.
Along the Path ways as per requirement 1 x 7 7 Nos #REF! 1 each
31 Supply and fixing of 300mm x 180mm x 140mm No.16 gauge CRCA sheet
box with hinged door and locking arrangements and din channel for fixing
2Nos MCBs duly powder coated with matching colour of poles including
fixing with necessary arrangments etc., complete.
1 x 7 7 Nos #REF! 1 each
32 Supply and fixing of 6-32A 10KA DP MCB, C/D Curve ISI Mark of make
Legrand / Schneider.
1 x 7 7 Nos #REF! 1 each
33 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain
Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of Data- Bld -
work with nomonal reinforcement Pi r2 d 18
a for Coping of Lamp post above GL 1 x 7 3.14 0.04 0.45 0.40 Cum 5044.84 1 Cum
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
34 ELEC-3.11.1: Supply and transportation of ......... LED Street light Body ele ssr-3-9-
made of high grade pressure die – cast Aluminum alloy with corrosion 15
resistant powder coat, having protective toughened glass cover, Less Glare,
IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66)
protected, universal Voltage 100 - 270 V AC, P.F, ≥ 0.90, high power LED's
having efficacy ≥130 lumens/watt, and junction temperature < 75°C, with
Ingress protection IP66, Driver surge protection 4KV, with optics distribution
Type II medium, THD<10% at 110 Volts AC, driver efficiency ≥90%, CCT:
5600K, minimum CRI≥80, Inbuilt Electrical protections like Over voltage,
short circuit, Over load, Open Circuit, Miswiring, Intelligent pole mounting
option provides flexibility of vertical or horizontal pole mounting option
complete, with Top Openable Maintenance and Manufacture has to submit
LM79,LM80 & Photobiological Safety Report. Luminaire Performance
Complies to IS10322 (Part 5/Sec 3) & IEC 60598-1,IEC 60529 and ISO
certified company. LUMINAIRE MAKE : PHILIPS / OSRAM / GE /
CROMPTON / BAJAJ / SCHREDER / VIN / HALONIX / HAVELLS / HPL.
LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG /
LG LEDs.
Along the Path ways as per requirement 1 x 7 7.00 Nos #REF! 1 each
35 BLD-ELEC-3-1-4 : Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C.
insulated flexible copper cable in existing pipe for mains inlcuding all labour
charges etc., complete.
1 x 7 5.00 35.00 Rmt #REF! 1 Rmt
36 BLD-ELEC-3-1-2 : Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C.
insulated flexible copper cable in existing pipe for earth continuity including
all labour charges etc., complete.
1 x 7 5.00 35.00 Rmt #REF! 1 Rmt
37 ELEC-4.1.3 : Supply of 6 Sqmm 2 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part -
I) of Makes : Torrent / Universal / Unicab / Polycab / Havells / Gloster / KEI
Under ground Cable connecting all poles and extra for pole to panel 1 x 7 40.00 280.00 Rmt #REF! 1 Rmt
38 ELEC-4.1.5 : Supply of 10 Sqmm 4 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part -
I) of Makes : Torrent / Universal / Unicab / Polycab / Havells / Gloster / KEI.
from Panel to incomming 1 x 1 30.00 30.00 Rmt #REF! 1 Rmt
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
39 ELEC-15.6.1 : Earth work excavation of Trench in hard ground soil, laying of
U.G cables upto 50 Sq,mm on sand cushion covering the cable with bricks
and back filling of Trench duly providing route indicator embedded in C.C
including cost and conveyance of materials and labour charges etc.,
complete.
for under ground Cabling 1 x 7 30.00 210.00 Rmt #REF! 1 Rmt
40 Supply, Transportation, fabrication and erection of following guage CRCA
sheet steel enclosure for power control cubicle panel / boxes etc., including
cutting, bending drilling, welding and reveting etc., complete with cleaning
with 7 tank process and painting with powder coating including cost and
conveyance of all materials and labour charges.
1 No of 0.9m x 1.20m size Box 1 x 1 1.200 0.900 1.08 Sqm #REF! 1 Sqm
41 BLD-ELEC-4-1-3: Supply and erection of Panel mounting cubical type ( 100
to 250A ) TPN 415V, 50 Hz. switch disconnector fuse unit complete with front
drive mechanism with door inter lock, padlocking arrangement etc., complete
with fuse links on existing control panel.
1 x 1 1.00 Nos #REF! 1 each
42 BLD-ELEC-4-3-3: Supply and erection of Panel mounting 125A, 4 Pole,
25kA, MCCB with thermal magnetic setting / Microprocessor based release
arrangement with all connections etc., complete on existing panel.
1 x 1 1.00 Nos #REF! 1 each
43 ELEC-3.5.1: Supply of Automatic Street Light Control System with Optical
Sensor, Low volatage / High voltage trip and reset, operating voltage 150 -
280V AC, 50 HZ with suitable SMC enclousure of IP 54 protection, MCBs
and contactor suitable to control the load of 3 KW of single phase load with
necessary clamping arrangements. Makes : Swadeep Nature Switch / Light
Mate.
1 x 1 1.00 Nos #REF! 1 each
44 BLD-ELEC-5-1-1 : Providing independent earthling by excavating a trench to
a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm
dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume
pipe ring duly providing staggered holes including filling with equal
proportion of Salt and Charcoal in layers and all labour charges etc.,
complete for small quarters.
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
45 Water fall Type fountain: (FRP) location :to be located on the two supporting
stone masanry pillars for projected height of 20 feet & width 10 feet with MS
angle for load bearing and water turf (over head tank) to be fabricated in
stainless steel size 8 ft lenght x 3 ft width x 3 ft. height and duly connected
with flexible pipe/GI pipe from the bottom collection & commisioning etc,.
including all civil works etc,. complete.
Amount
1687.00
1893.00
3861.00
Amount
5393.00
3055.00
4887.00
10410.00
Amount
8842.00
2623.00
1318.00
Amount
7067.00
7925.00
58961.00
22737.18
Amount
125946.00
40057.60
163972.60
251108.00
603821.38
Amount
1719.00
8746.88
288862.50
14031.50
63582.80
Amount
10853.52
5935.64
8276.12
3599.64
3940.47
399082.19
20214.57
82800.88
Amount
18511.34
18083.00
15087.00
18618.00
13482.00
34026.00
80508.00
301330.79
#REF!
Amount
#REF!
Amount
#REF!
#REF!
#REF!
2018.00
Amount
#REF!
#REF!
#REF!
#REF!
#REF!
Amount
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Amount
200000.00
#REF!
GENERAL ABSTRACT
Sub-Total. A Rs.
7 Add VAT @ 5%
9 Provision towards QC @ 1%
Sub-Total. B Rs.
Say Rs.
ut Scheme
Amount in Rs.
970327.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
152995.00
Err:509
Err:509
Err:509
KODADA MUNICIPALITY
GENERAL ABSTRACT
Sub-Total. A Rs.
3 Add VAT @ 5%
5 Provision towards QC @ 1%
Sub-Total. B Rs.
Say Rs.
Amrut
Amount in Rs.
#REF!
9457102.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Page 1986 of 2191
KODADA MUNICIPALITY
Construction of Park behind Sai Techno School at APHB Colony
DETAILED & ABSTRACT ESTIMATION
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
A Greenary & Childern's Play Area
1 RBR-HRTC-5:Making lawns including ploughing and breaking of clod,
removal of rubbish, dressing and supplying doobs grass roots and planting at
15 cm apart, including supplying and spreading of farm yard manure at rate
of 0.18 cum per 100 sqm including maintaning for 1 year. Data -Parks
-5
Area as per Drawing 1 x 1 610.00
610.00 Sqm 37.60 1 Sqm
2 BLD-CSTN-2-9 (17) : Filling with useful available excavated earth (excluding
rock) in trenches, sides of foundations and basement with initial lead in
layers not exceeding 15 cm thick, consolidating each deposited layer by
watering and ramming including cost and conveyance of water to work site
and all operational, incidental, labour charges, hire charges of T & P etc.,
complete for finished item of work. (APSS NO. 309 & 310)
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
5 RBR-HRTC-9: Planting of trees by the road side (Avenue trees) in 0.60 m dia
holes, 1 m deep dug in the ground, mixing the soil with decayed farm
yard/sludge manure, planting the saplings, backfilling the trench, watering,
Data -Parks
fixing the tree guard and maintaining the plants for one year -9
Ornamental trees 1 x 80 80.00 Nos 1550.80 1 Nos
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
6 RBR-HRTC-7: Planting permanent hedges including digging of trenches, 60
cm wide and 45 cm deep, refilling the excavated earth mixed with farmyard
manure, supplied at the rate of 4.65 cum per 100 metres and supplying and
planting hedge plants at 30 cm apart, and maintaining for 1 year Data -Parks
- 7 (a)
as per Drawing 1 x 2 192.00 Rmt 222.40 1 Rmt
7 Planting palms including digging of pits 60cm. Cubes, loosening of 15cm. As Per
Bottom red soil, filling with soil with 10 kg Compost + 100 DAP per pit staking Quotation
gap filling with in two month after planting. s
inside the Lawns and other places 2 x 32 64 Nos 350.00 1 Nos
8 Planting Speciman plants including digging of pits 60cm. Cubes, loosening of As Per
15cm. Bottom red soil, filling with soil with 10 kg Compost + 100 DAP per pit Quotation
staking gap filling with in two month after planting. s
Golden bamboo 8” 1 x 15 15 Nos 862.50 1 No
Fercaria 2” 1 x 10 10 Nos 1437.50 1 No
Ficus 4” (Verites). 1 x 10 10 Nos 575.00 1 No
Bottle Bush 1 x 10 10 Nos 690.00 1 No
9 Providing seating area development by providing cast Iron /Cement seats As Per
as directed by Engineer incharge etc, complete. Quotation
s
Idle Park bench 1 x 10 10 No 9875.00 1 No
10 See Saw 4 Seater 1 x 3 3 No 11645.00 1 No
11 Swinging Bench 1 x 3 3 No 19500.00 1 No
12 4 Way Climber 1 x 3 3 No 19080.00 1 No
13 Provision for Name Boards
Sub- Total for Greenary
Total of A+B+C
Say Rs.
ADA MUNICIPALITY
nd Sai Techno School at APHB Colony
& ABSTRACT ESTIMATION
Amount
22936.00
5479.02
60086.40
39980.80
Amount
124064.00
Amount
42700.80
3850.00
4312.50
7187.50
2875.00
3450.00
98750.00
34935.00
58500.00
57240.00
5000.00
571347.02
571347.00
5.71 Lakhs
Total weight in Kg
RATES
Cost of Mild Steel Tubes & pipes of all
diameters as per IS-1161r -SSR item No. 44.50 /Kg
fabricating all heavy steel works like
Trusses, Stanchions, Heavy Beams and
Girders etc excluding cost of fixing in
position 26.00 /Kg
Labour charges for fixing Iron Doors, Iron
Windows and 4.00 /Kg
Grills in position
ABSTRACT
Total weight
28.39
146.45
7.49
6.41
28.31
217.05
9659.00
5643.00
868.00
116.00
0.00
16286.00
Data for MS Gate
1 Supply, fabrication and fixing in position of MS sections of Horizontal member 20mm square bars of 2 Nos and
Vertical member 20mm Sqare bars c/c of 8" , for edges 2"X2" sq pipe in M.S including cost and conveyance of
all material and all labour chages etc complete.
Requirement of MS Sections of 1 Mts span
Total weight in Kg
square bars of 2 Nos and
g cost and conveyance of
Total weight
19.15
46.60
11.60
77.35
0.00
0.00
15.47
170.17
Page 1996 of 2191
SIDDIPET MUNICIPALITY
#REF!
Est-Borewells-1 1996
Page 1997 of 2191
Est-Borewells-1 1997
Page 1998 of 2191
Est-Borewells-1 1998
Page 1999 of 2191
Est-Borewells-1 1999
Page 2000 of 2191
Est-Borewells-1 2000
Page 2001 of 2191
Est-Borewells-1 2001
Page 2002 of 2191
Est-Borewells-1 2002
Page 2003 of 2191
Say Rs.
Est-Borewells-1 2003
Page 2004 of 2191
PET MUNICIPALITY
#REF!
27450.00
40260.00
#REF!
Est-Borewells-1 2004
Page 2005 of 2191
Amount
15700.00
Est-Borewells-1 2005
Page 2006 of 2191
Amount
6110.00
180.00
13530.00
Est-Borewells-1 2006
Page 2007 of 2191
Amount
#REF!
Est-Borewells-1 2007
Page 2008 of 2191
Amount
360.00
390.00
255.00
1825.00
95.00
2535.00
170.00
Est-Borewells-1 2008
Page 2009 of 2191
Amount
1050.00
Est-Borewells-1 2009
Page 2010 of 2191
Amount
1700.00
4250.00
120.00
2450.00
Err:509
Est-Borewells-1 2010
Page 2011 of 2191
Amount
Err:509
Err:509
Err:509
Err:509
Err:509
Est-Borewells-1 2011
Page 2012 of 2191
KODADA MUNICIPALITY
#REF!
S.No Description of Work Nos Length Width Depth Quantity Rate Per
6 Supply, Filling Sand in readymade trench including cost and
conveyance of all material and all labour charges etc for water
harvesting structure in complete shape.
1 x 1 3.00 3.00 0.25 2.25 Cum #REF! 1 Cum
S.No Description of Work Nos Length Width Depth Quantity Rate Per
7 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain
Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded
Metal including cost and conveyance of all materials like cement, sand,
coarse aggregate water etc., to site , seigniorage charges on all
materials, labour charges , for mixing , laying, concrete , ramming in
15 cm layers, finishing top surface to the required level curing etc.,
complete for finished item of work with nomonal reinforcement
CC Bed below Brick wall - Below Long walls 1 x 2 3.46 0.30 0.05 0.10
CC Bed below Brick wall - Below Short walls 1 x 2 2.00 0.30 0.05 0.06
0.16 Cum 5044.84 1 Cum
8 BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or
treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost
& conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to
site cost of Seigniorage charges on all materials, including all labour
charges like mixing Cement Mortor, scaffoding charges lift charges ,
curing charges etc., complete for finished item of work
S.No Description of Work Nos Length Width Depth Quantity Rate Per
10 BLD-CSTN-3-16-(31)-C; Supply and placing of the M-20 Design Mix
Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER
with 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site and including Seigniorage charges, sales & other taxes on
all materials including all operational, incidental and labour charges
such as weigh batching, machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for
finished item of work (APSS No. 402)with minimum cement content as
per IS code from standard suppliers approved by the department
including pumping, centering, shuttering, laying concrete, vibrating,
curing etc. complete but excluding cost of steel and its fabrication
charges for finished item of work. for RCC SLABS, BEAMS
RCC Precast Perforated Slabs of 100mm thick 1 x 1 3.00 3.00 0.10 0.90 Cum 11093.79 1 Cum
11 BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/
Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe
415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC
works , including labour charges for straightening, cutting, bending to
required sizes and shapes, placing in position with cover blocks of
approved materials and size and tying and lap-splicing with binding
wire of 18 SWG, forming grills for reinforcement work as per approved
designs and drawings, including cost and conveyance of steel bars,
including all wastages such as overlaps, couplings, chairs, spacer bars
including cost and conveyance of binding wire, cover blocks and all
incidental, operational, labour charges such as cutting, bending,
placing in position, tying including sales and other taxes on all materials
etc., complete for finished item of work in all floors.( APSS No.126
for RCC Precast Perforated Slabs @ 40 Kg/Cum 1 x 1 0.090 50.00 Kg/Cum 4.50 Kg 68.71 1 Kg
ODADA MUNICIPALITY
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Amount
#REF!
Amount
807.00
9328.00
1619.00
Amount
9984.00
309.00
#REF!
#REF!
GENERAL ABSTRACT
Sub-Total. A Rs.
4 Add VAT @ 5%
6 Provision towards QC @ 1%
Sub-Total. B Rs.
Say Rs.
Amount in Rs.
571347.00
1090239.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Page 2022 of 2191
KODADA MUNICIPALITY
Construction of Toilets
ABSTRACT AND DETAILED ESTIMATE
S.N. Description of Item Nos L B D Quantity Rate Per
A EWE for footings : A1,B1,A2,B2 1 x 4 1.30 1.30 1.80 12.17
12.17 Cum
1 RBR-FNDN-1-A-i -manual means : Earthwork excavation for structures in all types of
soils up to 3.00 Mts depth below GL as per drawing and technical specifications
including setting out, construction of shoring and bracing, removal of stumps and
other deleterious material and disposal upto a lead of 50 m, dressing of sides and
bottom and backfilling in trenches with excavated suitable material as per Technical Bld up to 3F
Specification 305 MORD / 304 MORTH. for Sumps,Thrust blocks, Chambers and S.No 7
Man
in all Holes etc.
types of by manual
soils means,
for footings 80 % 9.74 Cum 221.47 1 Cum
2 BLD-CSTN-2-7 - (15) - Hard rock (blasting prohibited)-Upto 3 m depth
Earth work excavation and depositing on bank for all lifts and with an initial lead of
10m including all operational, incidental, labour charges such as shoring ,sheeting,
planking, strutting, etc. complete for finished item of work including seigniorage
excluding dewatering charges etc as per SS - 20 B (APSS 308). Bld up to 3F
S.No 6
in Hard rocky soils 20 % 2.43 Cum 1893.14 1 Cum
B Earth work excavation for fundation of Walls
Toilet - long walls 1 x 2 4.90 0.45 0.40 1.76
Toilet - short walls 1 x 3 3.02 0.45 0.40 1.63
Toilets - inner short walls 1 x 2 1.93 0.45 0.40 0.69
Toilets - inner Long walls 1 x 1 5.05 0.45 0.40 0.91
4.99 Cum
3 BLD-CSTN-2-1 (9): Earth work excavation for foundations and depositing on bank
for all lifts and with an initial lead of 10m including all operational, incidental, labour
charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item
of work including seigniorage excluding dewatering charges etc as per SS - 20 B
(APSS 308). Bld up to 3F
S.No 1
in all types of soils 80 % 3.99 Cum Err:509 1 Cum
Total Rs.
Total Cost Say Rs.
A MUNICIPALITY
uction of Toilets
D DETAILED ESTIMATE
Amount
2157.00
4600.00
Err:509
Amount
1893.00
Amount
12379.00
46.00
Amount
11489.00
3673.00
15165.00
13394.00
Amount
5643.00
Amount
13133.00
11551.00
#REF!
Amount
4360.00
#REF!
#REF!
Amount
22314.00
9415.00
6736.00
Amount
2210.00
Amount
1463.00
2369.00
26996.00
Amount
29027.00
Amount
7598.00
5622.00
Amount
14996.00
11058.00
1238.00
Amount
20014.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
KODADA MUNICIPALITY
Construction of Park behind Sai Techno School at APHB Colony
Providng Jogging Tracks
S.N. Description of Item Nos L B D Quantity Unit Rate Per
1 RBR-FNDN-1 -manual means : Earthwork excavation for structures in all types of soil as
per drawing and technical specifications including setting out, construction of shoring
and bracing, removal of stumps and other deleterious material and disposal upto a lead
of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable
material as per Technical Specification 305 MORD / 304 MORTH. for Sumps,Thrust Data- Bld,
S.No. 7
blocks, column pits, Chambers and Man Holes etc. by manual means,
2m wide Jogging Tracks 1 x 1 330.00 2.40 0.20 158.40
1m wide Pathways 1 x 1 17.00 1.40 0.20 4.76
163.16 Cum 210.92 1 Cum
2 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and basement
with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer
by watering and ramming including cost and conveyance of water to work site and all
operational, incidental, labour charges, hire charges of T & P etc., complete for finished
item of work. (APSS NO. 309 & 310) Data- Bld -
10
2m wide Jogging Tracks 1 x 1 330.00 2.40 0.100 79.20
1m wide Pathways 1 x 1 17.00 1.40 0.100 2.38
81.58 Cum 910.40 1 Cum
3 BLD-CSTN-3-10- ( 27 ) Hand mixing: Plain Cement concrete nominal mix (1:3:6) prop
(Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine
Crushed Metal including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour charges , for
mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required
level curing etc., complete for finished item of work.for foundation and under flooring
bed.
2m wide Jogging Tracks 1 x 1 330.00 2.20 0.100 72.60
1m wide Pathways 1 x 1 17.00 1.20 0.100 2.04
74.64 Cum 4819.01 1 Cum
4 RBR-CCPV-13 - ii: Providing and Laying of Interlocking Concrete Block Pavements
using PHOENIX or equivalent high strength Cement Concrete interlocking Regular
Pavers of 50 mm thickness of M- 40 Grade of which top 12 mm thick shall be for colour
pigmentation with imported colours and white cement to get required reflective glazing
inclusive of all taxes - as per drawing and Technical Specification Clause 1504 MORD Data- Bld ,
S.No 38
2m wide Jogging Tracks 1 x 1 330.00 2.00 660.00
Amount
34414.00
74270.43
359691.00
Amount
386364.00
Amount
188918.00
44773.00
1809.00
1090239.43
1090239.43
10.90 Lakhs
KODADA MUNICIPALITY
Construction of Park behind Sai Techno School at APHB Colony
S.No Description of Work Nos Length Width Depth Quantity Rate Per
6 Supply, Filling Sand in readymade trench including cost and
conveyance of all material and all labour charges etc for water
harvesting structure in complete shape.
1 x 1 3.00 3.00 0.25 2.25 Cum #REF! 1 Cum
S.No Description of Work Nos Length Width Depth Quantity Rate Per
7 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain
Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded
Metal including cost and conveyance of all materials like cement, sand,
coarse aggregate water etc., to site , seigniorage charges on all
materials, labour charges , for mixing , laying, concrete , ramming in
15 cm layers, finishing top surface to the required level curing etc.,
complete for finished item of work with nomonal reinforcement
CC Bed below Brick wall - Below Long walls 1 x 2 3.46 0.30 0.05 0.10
CC Bed below Brick wall - Below Short walls 1 x 2 2.00 0.30 0.05 0.06
0.16 Cum 5044.84 1 Cum
8 BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or
treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost
& conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to
site cost of Seigniorage charges on all materials, including all labour
charges like mixing Cement Mortor, scaffoding charges lift charges ,
curing charges etc., complete for finished item of work
S.No Description of Work Nos Length Width Depth Quantity Rate Per
10 BLD-CSTN-3-16-(31)-C; Supply and placing of the M-20 Design Mix
Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER
with 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site and including Seigniorage charges, sales & other taxes on
all materials including all operational, incidental and labour charges
such as weigh batching, machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for
finished item of work (APSS No. 402)with minimum cement content as
per IS code from standard suppliers approved by the department
including pumping, centering, shuttering, laying concrete, vibrating,
curing etc. complete but excluding cost of steel and its fabrication
charges for finished item of work. for RCC SLABS, BEAMS
RCC Precast Perforated Slabs of 100mm thick 1 x 1 3.00 3.00 0.10 0.90 Cum 11093.79 1 Cum
11 BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/
Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe
415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC
works , including labour charges for straightening, cutting, bending to
required sizes and shapes, placing in position with cover blocks of
approved materials and size and tying and lap-splicing with binding
wire of 18 SWG, forming grills for reinforcement work as per approved
designs and drawings, including cost and conveyance of steel bars,
including all wastages such as overlaps, couplings, chairs, spacer bars
including cost and conveyance of binding wire, cover blocks and all
incidental, operational, labour charges such as cutting, bending,
placing in position, tying including sales and other taxes on all materials
etc., complete for finished item of work in all floors.( APSS No.126
for RCC Precast Perforated Slabs @ 40 Kg/Cum 1 x 1 0.090 50.00 Kg/Cum 4.50 Kg 68.71 1 Kg
ODADA MUNICIPALITY
behind Sai Techno School at APHB Colony
#REF!
#REF!
#REF!
#REF!
#REF!
Amount
#REF!
Amount
807.00
9328.00
1619.00
Amount
9984.00
309.00
#REF!
#REF!
GENERAL ABSTRACT
2 Construction of Toilets 2 No
Sub-Total. A Rs.
7 Add VAT @ 5%
9 Provision towards QC @ 1%
Sub-Total. B Rs.
Say Rs.
er Amrut
Amount in Rs.
113369.00
780138.00
970327.00
1607782.00
4058653.00
1926833.00
9457102.00
472855.00
94571.00
94571.00
9457.00
47286.00
141857.00
88114.00
948711.00
10405813.00
104.06 Lakhs
Page 2066 of 2191
KODADA MUNICIPALITY
Construction of Divider and central lighting
Development of Rajiv Park in Nalgonda Municipality, Under Amrut
DETAILED & ABSTRACT ESTIMATION
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
A Gate
Brick wall 1 x 1 3.94
Total length of Brick work at Gate 4.00 0.60 0.60 1.44
for gate Columns 1 x 2 1.10 0.60 0.60 0.79
2.23 Cum
1 BLD-CSTN-2-1 (9) : Earth work excavation for foundations and depositing on
bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308).
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
4 BLD-CSTN-3-13- ( 30 ) - A- Nominal mix: RCC M- 20 Nominal mix
(Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS
456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and
its fabrication charges for finished item of work, but including centering and
shuttering charges for FOUNDATIONS, PLINTH, PEDESTALS Data- Bld -
19.a,b
a Footings for Gate Columns 1 x 2 1.00 0.50 0.20 0.20 Cum 7930.76 1 Cum
b Pedastals for Gate Columns 1 x 2 0.60 0.60 0.25 0.18 Cum 8484.75 1 Cum
5 BLD-CSTN-3-13- ( 30 ) - B- Nominal mix: RCC M- 20 Nominal mix
(Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS
456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and
its fabrication charges for finished item of work, but including centering and
shuttering charges for COLUMNS, LINTELS, WATER TANKS, RCC WALLS
IN BUILDINGS - WOODEN SCAFFOLDING Data- Bld -
92
for Gate pillars 1 x 2 0.45 0.45 2.60 1.05 Cum 9973.53 1 Cum
6 BLD-CSTN-6-12-(67) : Construction of RR Masonary in Cement Mortor
( 1:8 ) Prop using hard granite stone including cost & Conveyance of all
materials like Cement, Sand , Water, Granite Stones, including Seigniorage
Charges on all Materials, ,labour charges for cutting Stones to required size
and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges
curing etc., complete for finished item of Work . Data- Bld -
31
For Foundations below GL
Brick wall 1 x 1 4.00 0.60 0.50 1.20
1.20 Cum 3470.13 1 Cum
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
7 BLD-CSTN-5-4-(42) ; Brick Masonary 2nd Class Ground moulded or
treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost &
conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site
cost of Seigniorage charges on all materials, including all labour charges
like mixing Cement Mortor, scaffoding charges lift charges , curing charges
etc., complete for finished item of work Data- Bld -
25
Brick wall 1 x 1 4.00 0.230 0.91 0.84
Brick Pillars 1 x 2 0.45 0.450 2.60 1.05
Deduct Brick Pillars -1 x 2 0.45 0.230 0.91 -0.19
Net Qty 1.70 Cum 5455.18 1 Cum
8 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level
Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work with nomonal reinforcement Data- Bld -
18
Over Brick Wall 1 x 1 4.00 0.28 0.075 0.08
Coping on Columns & Brick Pillars 1 x 4 0.45 0.45 0.075 0.06
0.14 Cum 5044.84 1 Cum
9 BLD-CSTN-8-2-(77) : Plastering with 12mm thick in single coat in CM (1:4)
finished smooth including cost and conveyance of all materials to site,
seigniorage charges on all materials, finishing, curing, scaffolding and all
operational, incidental, labour charges etc., including cutting grooves where
ever necessary etc., complete for finished item of work. (As per SS 903). per
10 Sqm. Data- Bld -
36
for exposed faces of the Columns & Pillars - Rear Side 1 x 4 0.45 0.91 1.65
For ornmental work - pillars 1 x 4 0.25 2.30 2.30
1 x 4 0.68 0.15 0.41
1 x 4 0.55 0.15 0.34
3 x 4 0.55 0.08 0.50
For Brick wall 2 x 1 4.00 0.91 7.32
Deduct Brick Pillars -1 x 4 0.90 0.91 -3.29
9.23 Sqm 150.75 1 Sqm
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
10 BLD-CSTN-11-5-(162) : White washing two coats with whiting of approved
quality to give an even shade after thoroughly brushing the surface to
remove all dirt and remains of loose powdered materials including cost of all
materials, labour charges and incidental such as scaffolding, lift charges etc.,
complete for finished item of work, but excluding conveyance charges of
materials Data- Bld -
59
Qty as per Plastering area excluding pillars 4.55
4.55 Sqm 38.97 1 Sqm
11 BLD-CSTN-11-8-(164) : Colour washing two coats with approved Colour and
quality to give an even shade after thoroughly brushing the surface to
remove all dirt and remains of loose powdered materials including cost of all
materials, labour charges and incidental such as scaffolding, lift charges etc.,
complete for finished item of work, but excluding conveyance charges of Data- Bld -
60
materials
Pillars
CladdingQty to External walls with Granite stone tiles 8 mm thick (mirror 1 x 4 0.45 2.60 4.68 Sqm 58.46 1 Sqm
12 polished of all shades) using cement compatible bonding agent having
acrylic emulsion base set over 12mm thick CM (1:3) base coat and neat grey
cement slurry of honey like consistency spread at the rate of 3.3 kg.s per
sq.mt including fixing with MS clits with anticorrosive coating hold fasts and
using Janatha paste and jointed with white cement paste mixed with pigment
of matching shade to match the shade of granite slabs including cost and
conveyance of all materials and water to work site, including cost of
seigniorage charges on all materials and all operational, incidental, and
labour charges such as mixing mortar, fixing in position, including lift
charges, curing, including cutting the brick masonry walls and redoing the Data- Bld -
same such that the top surface of tiles is to be flushed with plastered 70
surface
Claddingetc., complete&for
for Columns finished item of work.(APSS No.701 & 707)
Pillars 1 x 4 1.35 2.60 14.04
For Brick Wall 1 x 1 3.10 0.91 2.83
16.87 Sqm 1458.57 1 Sqm
13 Supply, fabrication and fixing in position of MS sections of Horizontal
member 20mm square bars of 2 Nos and Vertical member 20mm Sqare bars
c/c of 8" , for edges 2"X2" sq pipe in M.Sincluding fixing with 4 Nos of MS Z
holdfasts (2 on each side) duly making cutting brick masonry, fixing and
making to original surface neatly and painting gate with one coat of red oxide
primer including cost and conveyance of all materials,Locking arrangment,
Ornamental pieces etc ,cutting, bending, welding including all operational
charges and all labour charges etc., complete for finished item of work.
Data- Bld -
87
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
Ms Gate ( Two Wings) 1 x 2 160.00 Kg 320.00
Add extra 32.00
352.00 Kg 90.00 1 Kg
14 Supplying and fixing of MS Grills as per Drawings including fixing with 4 Nos
of MS Z holdfasts (2 on each side) duly making cutting masonry, fixing and
making to original surface neatly and painting gate with one coat of red oxide
primer including cost and conveyance of all materials,Locking arrangment,
Ornamental pieces etc ,cutting, bending, welding including all operational
charges and all labour charges etc., complete for finished item of work. Data- Bld -
72
MS Grills for compound wall @ 85Kg/each 1 x 2 85.00 Kg/each 170.00 Kg 88.05 1 Kg
15 BLD-CSTN-4-1-(34): Providing High Yield Strength Deformed (HYSD)/
Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe
500 grade as per IS 1786-1979) of different diameters for RCC works ,
including labour charges for straightening, cutting, bending to required sizes
and shapes, placing in position with cover blocks of approved materials and
size and tying and lap-splicing with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and drawings, including cost
and conveyance of steel bars, including all wastages such as overlaps,
couplings, chairs, spacer bars including cost and conveyance of binding
wire, cover blocks and all incidental, operational, labour charges such as
cutting, bending, placing in position, tying including sales and other taxes on
all materials etc., complete for finished item of work in all floors.( APSS Bld up to
No.126 3F S.No 22
Footings and pedastals 0.38 30.00 Kg/Cum 11.40
Columns 1.05 100.00 Kg/Cum 105.00
Total 116.40 Kgs
Or Say 0.12 MTs 68714.00 1 MTs
Total
Say Rs.
ADA MUNICIPALITY
f Divider and central lighting
in Nalgonda Municipality, Under Amrut
& ABSTRACT ESTIMATION
Amount
738.00
1893.00
1666.00
Amount
1586.00
1527.00
10472.00
4164.00
Amount
9274.00
706.00
1391.00
Amount
177.00
274.00
24606.08
Amount
31680.00
14969.00
8246.00
113369.08
1.13 Lakhs
KODADA MUNICIPALITY
Development of Rajiv Park in Nalgonda Municipality, Under Amrut
Construction of Toilets
ABSTRACT AND DETAILED ESTIMATE
S.N. Description of Item Nos L B D Quantity Rate Per
A EWE for footings : A1,B1,A2,B2 1 x 4 1.30 1.30 1.80 12.17
12.17 Cum
1 RBR-FNDN-1-A-i -manual means : Earthwork excavation for structures in all types of
soils up to 3.00 Mts depth below GL as per drawing and technical specifications
including setting out, construction of shoring and bracing, removal of stumps and
other deleterious material and disposal upto a lead of 50 m, dressing of sides and
bottom and backfilling in trenches with excavated suitable material as per Technical
Specification 305 MORD / 304 MORTH. for Sumps,Thrust blocks, Chambers and Bld up to 3F
S.No 7
Man Holes etc. by manual means,
in all types of soils for footings 80 % 9.74 Cum 221.47 1 Cum
2 BLD-CSTN-2-7 - (15) - Hard rock (blasting prohibited)-Upto 3 m depth
Earth work excavation and depositing on bank for all lifts and with an initial lead of
10m including all operational, incidental, labour charges such as shoring ,sheeting,
planking, strutting, etc. complete for finished item of work including seigniorage
excluding dewatering charges etc as per SS - 20 B (APSS 308). Bld up to 3F
S.No 6
in Hard rocky soils 20 % 2.43 Cum 1893.14 1 Cum
B Earth work excavation for fundation of Walls
Toilet - long walls 1 x 2 4.90 0.45 0.40 1.76
Toilet - short walls 1 x 3 3.02 0.45 0.40 1.63
Toilets - inner short walls 1 x 2 1.93 0.45 0.40 0.69
Toilets - inner Long walls 1 x 1 5.05 0.45 0.40 0.91
4.99 Cum
3 BLD-CSTN-2-1 (9): Earth work excavation for foundations and depositing on bank
for all lifts and with an initial lead of 10m including all operational, incidental, labour
charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item
of work including seigniorage excluding dewatering charges etc as per SS - 20 B
(APSS 308). Bld up to 3F
S.No 1
in all types of soils 80 % 3.99 Cum 369.10 1 Cum
Total Rs.
Total Cost Say Rs.
A MUNICIPALITY
n Nalgonda Municipality, Under Amrut
uction of Toilets
D DETAILED ESTIMATE
Amount
2157.00
4600.00
1473.00
Amount
1893.00
Amount
12379.00
46.00
Amount
11489.00
3673.00
15165.00
13394.00
Amount
5643.00
Amount
13133.00
11551.00
12978.00
Amount
4360.00
555.00
61043.00
Amount
22314.00
9415.00
6736.00
Amount
2210.00
Amount
1463.00
2369.00
26996.00
Amount
39167.00
Amount
7598.00
5622.00
Amount
14996.00
11058.00
1238.00
Amount
20014.00
346728.00
26004.60
17336.40
390069.00
390069.00
3.90 Lakhs
KODADA MUNICIPALITY
Development of Rajiv Park in Nalgonda Municipality, Under Amrut
DETAILED & ABSTRACT ESTIMATION
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
C Greenary & Childern's Play Area
1 RBR-HRTC-5:Making lawns including ploughing and breaking of clod,
removal of rubbish, dressing and supplying doobs grass roots and planting at
15 cm apart, including supplying and spreading of farm yard manure at rate
Data -Parks
of 0.18 cum per 100 sqm including maintaning for 1 year. -5
Area as per Drawing 1 x 1 4262.00
4262.00 Sqm 37.60 1 Sqm
2 BLD-CSTN-2-9 (17) : Filling with useful available excavated earth (excluding
rock) in trenches, sides of foundations and basement with initial lead in
layers not exceeding 15 cm thick, consolidating each deposited layer by
watering and ramming including cost and conveyance of water to work site
and all operational, incidental, labour charges, hire charges of T & P etc.,
complete for finished item of work. (APSS NO. 309 & 310)
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
5 RBR-HRTC-9: Planting of trees by the road side (Avenue trees) in 0.60 m dia
holes, 1 m deep dug in the ground, mixing the soil with decayed farm
yard/sludge manure, planting the saplings, backfilling the trench, watering,
Data -Parks
fixing the tree guard and maintaining the plants for one year -9
Ornamental trees 1 x 90 90.00 Nos 1550.80 1 Nos
6 RBR-HRTC-7: Planting permanent hedges including digging of trenches, 60
cm wide and 45 cm deep, refilling the excavated earth mixed with farmyard
manure, supplied at the rate of 4.65 cum per 100 metres and supplying and
planting hedge plants at 30 cm apart, and maintaining for 1 year Data -Parks
- 7 (a)
as per Drawing 1 x 3 270.00 Rmt 222.40 1 Rmt
7 Planting palms including digging of pits 60cm. Cubes, loosening of 15cm. As Per
Bottom red soil, filling with soil with 10 kg Compost + 100 DAP per pit staking Quotation
gap filling with in two month after planting. s
inside the Lawns and other places 2 x 45 90 Nos 350.00 1 Nos
8 Planting Speciman plants including digging of pits 60cm. Cubes, loosening of As Per
15cm. Bottom red soil, filling with soil with 10 kg Compost + 100 DAP per pit Quotation
staking gap filling with in two month after planting. s
Golden bamboo 8” 1 x 20 20 Nos 862.50 1 No
Fercaria 2” 1 x 20 20 Nos 1437.50 1 No
Ficus 4” (Verites). 1 x 20 20 Nos 575.00 1 No
Bottle Bush 1 x 20 20 Nos 690.00 1 No
9 Providing seating area development by providing cast Iron /Cement seats As Per
as directed by Engineer incharge etc, complete. Quotation
s
Idle Park bench 1 x 15 15 No 9875.00 1 No
10 See Saw 4 Seater 1 x 4 4 No 11645.00 1 No
11 Swinging Bench 1 x 4 4 No 19500.00 1 No
12 4 Way Climber 1 x 3 3 No 19080.00 1 No
13 Provision for Name Boards
Sub- Total for Greenary
Total
Say Rs.
ADA MUNICIPALITY
in Nalgonda Municipality, Under Amrut
& ABSTRACT ESTIMATION
Amount
160251.20
38293.26
159320.00
56223.00
Amount
139572.00
60048.00
3850.00
4312.50
7187.50
2875.00
3450.00
148125.00
46580.00
78000.00
57240.00
5000.00
970327.46
970327.00
9.70 Lakhs
KODADA MUNICIPALITY
Development of Rajiv Park in Nalgonda Municipality, Under Amrut
Providng Jogging Tracks
DETAILED & ABSTRACT ESTIMATION
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
A Jogging Tracks
1 BLD-CSTN-2-1 (9): Earth work excavation and depositing on bank for all lifts
and with an initial lead of 10m including all operational, incidental, labour
charges such as shoring ,sheeting, planking, strutting, etc. complete for
finished item of work including seigniorage excluding dewatering charges etc
as per SS - 20 B (APSS 308). Data- Bld -
1
a For Walking Track
for sectioning and levelling the ground for Pathways - 2.5m wide 1 x 1 288.00 2.90 0.150 125.28
for sectioning and levelling the ground for Jagging track - 2.5m wide 1 x 1 300.00 2.90 0.150 130.50
for kerbing walls on both sides of the path ways 1 x 1 300.00 0.30 0.150 13.50
Total Qty 269.28 Cum 369.10 1 Cum
2 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating
each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310) Data- Bld -
10
For levelling the track between walls - Pathways - 2.5m wide 1 x 1 288.00 2.90 0.075 62.64
For levelling the track between walls - Jagging track - 2.5m wide 1 x 1 300.00 2.90 0.075 65.25
127.89 Cum 910.40 1 Cum
3 BLD-CSTN-3-6 ( 23 ) -Hand mixing up to Plinth Level : Plain Cement
concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse
aggregate ) using 40mm size Hard Granite Machine Crushed Metal including
cost and conveyance of all materials like cement, sand, coarse aggregate
water etc., to site , seigniorage charges on all materials, labour charges ,
for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface
to the required level curing etc., complete for finished item of work.for
foundation and under flooring bed. Data- Bld -
15
For levelling the track between walls - Pathways - 2.5m wide 1 x 1 288.00 2.70 0.075 58.32
For levelling the track between walls - Jagging track - 2.5m wide 1 x 1 300.00 2.70 0.075 60.75
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
Total Qty 119.07 Cum 3726.65 1 Cum
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
4 RBR-CCPV-13 - ii: Providing and Laying of Interlocking Concrete Block
Pavements using PHOENIX or equivalent high strength Cement Concrete
interlocking Regular Pavers of 50 mm thickness of M- 40 Grade of which top
12 mm thick shall be for colour pigmentation with imported colours and
white cement to get required reflective glazing inclusive of all taxes - as per
Data- Bld -
drawing and Technical Specification Clause 1504 MORD 124
for Path way 1 x 1 288.00 2.50 720.00
for Jogging tracks 1 x 1 300.00 2.50 750.00
Total Qty 1470.00 Sqm 570.70 1 Sqm
5 RBR-TSRA-29 : Cast in Situ Cement Concrete M20 Kerb: Construction of
cement concrete kerb with top and bottom width 115 and 165 mm
respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150
mm thick, foundation having 50 mm projection beyond kerb stone, kerb
stone laid with kerb laying machine, foundation concrete laid manually, all
complete as per clause 408 MORTH Data- Bld ,
S.No 19
Curb wall as per requirement 1 x 1 300.00 300.00
300.00 Rmt 286.24 1 Rmt
6 BLD-CSTN-8-2-(77) ; Plastering with 12mm thick in single coat in CM (1:4)
finished smooth including cost and conveyance of all materials to site,
seigniorage charges on all materials, finishing, curing, scaffolding and all
operational, incidental, labour charges etc., including cutting grooves where Data Bld
ever necessary etc., complete for finished item of work. (As per SS 903). per S.No 42
10 Sqm.
outer sides of curb wall above GL 1 x 1 300.00 0.45 135.00
Total 135.00 Sqm 150.75 1 Sqm
Carting of surplus excavated rock from the site to a distance suitable
7
including loading, unloading charges, cost & conveyance, dumping, labour
charges, all leads & lifts and other incidental and operational charges etc.,
complete.
Carting of earth 53.86 Cum 57.10 1 Cum
Say Rs.
ADA MUNICIPALITY
in Nalgonda Municipality, Under Amrut
dng Jogging Tracks
& ABSTRACT ESTIMATION
Amount
99391.25
116431.06
Amount
443732.22
Amount
838929.00
85872.00
20351.00
3075.00
1607782.00
16.08 Lakhs
KODADA MUNICIPALITY
Development of Rajiv Park in Nalgonda Municipality, Under Amrut
Providng internal Pathways
S.N. Description of Item Nos L B D Quantity Unit Rate Per
1 RBR-FNDN-1 -manual means : Earthwork excavation for structures in all types of soil as
per drawing and technical specifications including setting out, construction of shoring
and bracing, removal of stumps and other deleterious material and disposal upto a lead
of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable
material as per Technical Specification 305 MORD / 304 MORTH. for Sumps,Thrust Data- Bld,
S.No. 7
blocks, column pits, Chambers and Man Holes etc. by manual means,
6m wide pathway as per drwg 1 x 1 438.00 6.40 0.20 560.64
for kerbing walls on both sides of the path ways 1 x 1 438.00 0.30 0.150 19.71
580.35 Cum 210.92 1 Cum
2 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and basement
with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer
by watering and ramming including cost and conveyance of water to work site and all
operational, incidental, labour charges, hire charges of T & P etc., complete for finished
item of work. (APSS NO. 309 & 310) Data- Bld -
10
6m wide pathway as per drwg 1 x 1 438.00 6.40 0.100 280.32
280.32 Cum 910.40 1 Cum
3 BLD-CSTN-3-10- ( 27 ) Hand mixing: Plain Cement concrete nominal mix (1:3:6) prop
(Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine
Crushed Metal including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour charges , for
mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required
level curing etc., complete for finished item of work.for foundation and under flooring
bed.
6m wide pathway as per drwg 1 x 1 438.00 6.20 0.100 271.56
271.56 Cum 4819.01 1 Cum
4 BLD-CSTN-9-4-(102) : Flooring with precast terrazzo chequered tiles conforming to
IS: 13801 Supplying precast terrazzo plain tiles conforming to IS:13801 using marble
aggregates of size 10mm, sand, marble powder, white cement pigments etc., with
terrazzo topping not less than 6 mm of tiles overall size not less than 20 mm thick any
coloured shades. set over base coat of cement mortar (1:6) 12 mm thick over CC bed Data- Bld ,
S.No 38
already laid or RCC roof slab, including near cement slurry of honey like consistency
6m wide@pathway
spread 3.3.kgs as
perper
sqmdrwg
& jointed with neat cement to full depth mixed with pigment of 1 x 1 438.00 6.00 2628.00
matching shade including cost of all materials like cement, sand water and tiles etc., 2628.00 Sqm 783.45 1 Sqm
complete, including seigniorage charges, complete for finished item of work, including
the cost and conveyance of all materials.
Amount
122407.00
255203.33
1308650.00
2058907.00
Amount
250746.00
59426.00
3314.00
4058653.33
4058653.33
40.59 Lakhs
KODADA MUNICIPALITY
Development of Rajiv Park in Nalgonda Municipality, Under Amrut
Providng internal Pathways
S.N. Description of Item Nos L B D Quantity Unit Rate Per
1 RBR-FNDN-1 -manual means : Earthwork excavation for structures in all types of soil as
per drawing and technical specifications including setting out, construction of shoring
and bracing, removal of stumps and other deleterious material and disposal upto a lead
of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable
material as per Technical Specification 305 MORD / 304 MORTH. for Sumps,Thrust Data- Bld,
S.No. 7
blocks, column pits, Chambers and Man Holes etc. by manual means,
2.5 m wide pathway (at train track) 1 x 1 370.00 2.90 0.15 160.95
2.5 m wide pathway (internal path way) 1 x 1 345.00 2.90 0.15 150.08
311.03 Cum 210.92 1 Cum
2 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and basement
with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer
by watering and ramming including cost and conveyance of water to work site and all
operational, incidental, labour charges, hire charges of T & P etc., complete for finished
item of work. (APSS NO. 309 & 310) Data- Bld -
10
2.5 m wide pathway (at train track) 1 x 1 370.00 2.90 0.075 80.48
2.5 m wide pathway (internal path way) 1 x 1 345.00 2.90 0.075 75.04
155.52 Cum 910.40 1 Cum
3 BLD-CSTN-3-10- ( 27 ) Hand mixing: Plain Cement concrete nominal mix (1:3:6) prop
(Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine
Crushed Metal including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour charges , for
mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required
level curing etc., complete for finished item of work.for foundation and under flooring
bed.
2.5 m wide pathway (at train track) 1 x 1 370.00 2.70 0.075 74.93
2.5 m wide pathway (internal path way) 1 x 1 345.00 2.70 0.075 69.86
144.79 Cum 4819.01 1 Cum
Amount
65602.00
141585.41
697744.00
Amount
1020126.00
1776.00
1926833.41
1926833.00
19.27 Lakhs
GENERAL ABSTRACT
447524687.xlsx-Park-Mythrivanam 2123
Page 2124 of 2191
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
10.85 Cum Err:509 1 Cum
4 BLD-CSTN-3-13- ( 30 ) - A- Nominal mix: RCC M- 20 Nominal mix
(Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS
456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and
its fabrication charges for finished item of work, but including centering and
shuttering charges for FOUNDATIONS, PLINTH, PEDESTALS Data- Bld -
19.a,b
a Footings for Gate pillars 2 x 2 1.00 1.00 0.20 0.80 Cum Err:509 1 Cum
b Pedastals for Gate pillars 1 x 2 0.60 0.60 0.65 0.47 Cum Err:509 1 Cum
5 BLD-CSTN-3-13- ( 30 ) - B- Nominal mix: RCC M- 20 Nominal mix
(Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS
456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and
its fabrication charges for finished item of work, but including centering and
shuttering charges for COLUMNS, LINTELS, WATER TANKS, RCC WALLS
IN BUILDINGS - WOODEN SCAFFOLDING Data- Bld -
92
for Gate pillars 1 x 2 0.30 0.30 2.00 0.36 Cum Err:509 1 Cum
6 BLD-CSTN-6-12-(67) : Construction of RR Masonary in Cement Mortor
( 1:8 ) Prop using hard granite stone including cost & Conveyance of all
materials like Cement, Sand , Water, Granite Stones, including Seigniorage
Charges on all Materials, ,labour charges for cutting Stones to required size
and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges
curing etc., complete for finished item of Work . Data- Bld -
31
For Foundations below GL
for Compound Wall 1 x 1 173.00 0.60 0.60 62.28
62.28 Cum Err:509 1 Cum
447524687.xlsx-Park-Mythrivanam 2124
Page 2125 of 2191
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
7 BLD-CSTN-6-6-(61) ; Construction of CRS Masonary 2nd Sort in Cement
Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of
all materials like Cement, Sand , Water, Granite Stones, including
Seigniorage Charges on all Materials, ,labour charges for cutting Stones to
required size and shape, mixing of Cement Mortor, Construction, Scaffolding
Charges curing etc., complete for finished item of Work . Data- Bld -
30
Compound Wall Front side excluding gate 1 x 1 59.30 0.45 0.45 12.01
for pillars for fixing MS grills in front side at every 3.00m C/C 1 x 20 0.45 0.45 1.80 7.29
Compound Wall South side 1 x 1 57.66 0.45 0.45 11.68
Compound Wall East side 1 x 1 50.19 0.45 0.45 10.16
Deduction for CRS pillars from wall -1 x 20 0.45 0.45 0.45 -1.82
Net Qty 39.32 Cum Err:509 1 Cum
8 BLD-CSTN-5-4-(42) ; Brick Masonary 2nd Class Ground moulded or
treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost &
conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site
cost of Seigniorage charges on all materials, including all labour charges
like mixing Cement Mortor, scaffoding charges lift charges , curing charges
etc., complete for finished item of work Data- Bld -
25
Compound Wall South side 1 x 1 57.66 0.230 1.35 17.90
Compound Wall East side 1 x 1 50.19 0.230 1.35 15.58
Add for Brick Pillars @ every 3.00m C/C 1 x 40 0.35 0.350 1.35 6.62
Deduction for Brick Pillars -1 x 40 0.35 0.23 1.35 -4.35
Net Qty 35.75 Cum Err:509 1 Cum
9 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level
Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work with nomonal reinforcement Data- Bld -
18
Over CRS Walls in front side for fixing the Grills (0.15+0.2)/2 2 x 20 3.00 0.225 0.175 4.73
Over CRS Pillars in front side 1 x 20 0.45 0.45 0.075 0.30
Over CRS walls
Compound Wall South side 1 x 1 57.66 0.45 0.05 1.30
Compound Wall East side 1 x 1 50.19 0.45 0.05 1.13
Over Brick walls with 0.025m bearing
447524687.xlsx-Park-Mythrivanam 2125
Page 2126 of 2191
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
Compound Wall South side 1 x 1 57.66 0.28 0.075 1.21
Compound Wall East side 1 x 1 50.19 0.28 0.075 1.05
Over Pillars 1 x 40 0.35 0.35 0.075 0.37
Deduct Brick Pillars portion from walls -1 x 40 0.35 0.23 0.075 -0.24
9.85 Cum Err:509 1 Cum
10 BLD-CSTN-7-3-(74): Providing raised Cement Pointing to RR Masonary in
Cement Mortor (1:3 )Prop . for including cost & conveyance of all materials
to site , seignaiorage charges on all materials, labour charges on all
materials, curing etc., Complete for finished item of work Data- Bld -
34
Both sides of CRS walls
Compound Wall Front side excluding gate 1 x 2 59.30 0.45 53.37
for pillars for fixing MS grills in front side at every 3.00m C/C 20 x 4 0.45 1.80 64.80
Compound Wall South side 1 x 2 57.66 0.45 51.89
Compound Wall East side 1 x 2 50.19 0.45 45.17
215.23 Sqm Err:509 1 Sqm
11 BLD-CSTN-8-2-(77) : Plastering with 12mm thick in single coat in CM (1:4)
finished smooth including cost and conveyance of all materials to site,
seigniorage charges on all materials, finishing, curing, scaffolding and all
operational, incidental, labour charges etc., including cutting grooves where
ever necessary etc., complete for finished item of work. (As per SS 903). per
10 Sqm. Data- Bld -
36
Both sides of Compound wall ( including DPC )
Compound Wall South side 1 x 2 57.66 1.35 155.68
Compound Wall East side 1 x 2 50.19 1.35 135.51
for exposed faces of the Brick pillars 2 x 40 0.12 1.35 12.96
over coping of Brick walls 1 x 1 107.85 0.28 30.20
334.35 Sqm Err:509 1 Sqm
12 BLD-CSTN-11-5-(162) : White washing two coats with whiting of approved
quality to give an even shade after thoroughly brushing the surface to
remove all dirt and remains of loose powdered materials including cost of all
materials, labour charges and incidental such as scaffolding, lift charges etc.,
complete for finished item of work, but excluding conveyance charges of
materials Data- Bld -
59
Qty as per Plastering area excluding pillars 334.35
Deduct Pillars plastering -2 x 40 0.35 1.35 -37.80
Qty as per Plastering area excluding pillars 296.55 Sqm Err:509 1 Sqm
447524687.xlsx-Park-Mythrivanam 2126
Page 2127 of 2191
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
13 BLD-CSTN-11-8-(164) : Colour washing two coats with approved Colour and
quality to give an even shade after thoroughly brushing the surface to
remove all dirt and remains of loose powdered materials including cost of all
materials, labour charges and incidental such as scaffolding, lift charges etc.,
complete for finished item of work, but excluding conveyance charges of Data- Bld -
60
materials
Pillars Qty 2 x 40 0.35 1.35 37.80 Sqm Err:509 1 Sqm
447524687.xlsx-Park-Mythrivanam 2127
Page 2128 of 2191
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
14 Supplying and fixing of MS Gate using 45 x 45 x 6mm MS equal angle
alround and 2 Nos 35x35x5mm Equal angles horizontal supports at 0.50m
c/c, 2.00mm MS sheet at bottom 0.30m height and 12mm MS square bars
Vertically at 125mm centre to centre including fixing with 4 Nos of MS Z
holdfasts (2 on each side) duly making cutting brick masonry, fixing and
making to original surface neatly and painting gate with one coat of red oxide
primer including cost and conveyance of all materials,Locking arrangment,
Ornamental pieces etc ,cutting, bending, welding including all operational
charges and all labour charges etc., complete for finished item of work. Data- Bld -
87
2 Wings of 90.00 Kg Each ( 1.98m x1.5m ) 2 x 2 90.00 Kg 360.00
for Wicket gate 2 x 1 50.00 Kg 100.00
MS Grills for drain out water- 2 Nos for compound wall @ 15 Kg/each 2 x 2 25.00 Kg 100.00
560.00 Kg Err:509 1 Kg
15 Supplying and fixing of MS Grills as per Drawings including fixing with 4 Nos
of MS Z holdfasts (2 on each side) duly making cutting masonry, fixing and
making to original surface neatly and painting gate with one coat of red oxide
primer including cost and conveyance of all materials,Locking arrangment,
Ornamental pieces etc ,cutting, bending, welding including all operational
charges and all labour charges etc., complete for finished item of work. Data- Bld -
72
MS Grills for compound wall @ 100 Kg/each 1 x 20 80.00 Kg/each 1600.00 Kg Err:509 1 Kg
Sub- Total for Compound wall - A
B Jogging Tracks & Path ways
1 BLD-CSTN-2-1 (9): Earth work excavation and depositing on bank for all lifts
and with an initial lead of 10m including all operational, incidental, labour
charges such as shoring ,sheeting, planking, strutting, etc. complete for
finished item of work including seigniorage excluding dewatering charges etc
as per SS - 20 B (APSS 308). Data- Bld -
1
a For Walking Track
for sectioning and levelling the ground for Pathways 1 x 1 165.00 2.20 0.200 72.60
for kerbing walls on both sides of the path ways 1 x 2 165.00 0.30 0.150 14.85
Total Qty 87.45 Cum Err:509 1 Cum
2 RBR-TSRA-29 : Cast in Situ Cement Concrete M20 Kerb: Construction of
cement concrete kerb with top and bottom width 115 and 165 mm
respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150
mm thick, foundation having 50 mm projection beyond kerb stone, kerb
stone laid with kerb laying machine, foundation concrete laid manually, all data-
complete as per clause 408 MORTH parks-22
447524687.xlsx-Park-Mythrivanam 2128
Page 2129 of 2191
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
for Kerbing of Pathways 1 x 2 165.00 330.00
330.00 Rmt Err:509 1 Rmt
447524687.xlsx-Park-Mythrivanam 2129
Page 2130 of 2191
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
3 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating
each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310) Data- Bld -
10
For levelling the track between walls 1 x 1 165.00 2.20 0.100 36.30
36.30 Cum Err:509 1 Cum
4 BLD-CSTN-3-6 ( 23 ) -Hand mixing up to Plinth Level : Plain Cement
concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse
aggregate ) using 40mm size Hard Granite Machine Crushed Metal including
cost and conveyance of all materials like cement, sand, coarse aggregate
water etc., to site , seigniorage charges on all materials, labour charges ,
for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface
to the required level curing etc., complete for finished item of work.for
foundation and under flooring bed. Data- Bld -
15
a For levelling the walking track between walls 1 x 1 165.00 2.10 0.100 34.65
Total Qty 34.65 Cum Err:509 1 Cum
5 RBR-CCPV-13 - ii: Providing and Laying of Interlocking Concrete Block
Pavements using PHOENIX or equivalent high strength Cement Concrete
interlocking Regular Pavers of 50 mm thickness of M- 40 Grade of which top
12 mm thick shall be for colour pigmentation with imported colours and
white cement to get required reflective glazing inclusive of all taxes - as per
Data- Bld -
drawing and Technical Specification Clause 1504 MORD 124
a for Jogging tracks 1 x 1 165.00 2.00 330.00
Total Qty 330.00 Sqm Err:509 1 Sqm
Sub- Total for Path ways - B
C Greenary & Play Area
1 RBR-HRTC-5:Making lawns including ploughing and breaking of clod,
removal of rubbish, dressing and supplying doobs grass roots and planting at
15 cm apart, including supplying and spreading of farm yard manure at rate
Data -Parks
of 0.18 cum per 100 sqm including maintaning for 1 year. -5
Area as per Drawing 1 x 1 673.00
Play area 1 x 1 106.00
779.00 Sqm 37.60 1 Sqm
447524687.xlsx-Park-Mythrivanam 2130
Page 2131 of 2191
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
2 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating
each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310)
Filling sand - Play Area 1 x 1 37.00 0.30 11.28 Sqm 0.00 1 Sqm
447524687.xlsx-Park-Mythrivanam 2131
Page 2132 of 2191
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
3 RBR-HRTC-8: Planting ( Running metres 200 plants and 800 shrubs in two
rows in one km length of road where width of verge is 3m and above.) and
maintaing for One year of flowering plants and shrubs in central verge as
Data -Parks
per Specification 307 MORTH -8
Area as per Drawing 1 x 1 293.00
293.00 Rmt 124.94 1 Rmt
4 RBR-HRTC-9: Planting of trees by the road side (Avenue trees) in 0.60 m dia
holes, 1 m deep dug in the ground, mixing the soil with decayed farm
yard/sludge manure, planting the saplings, backfilling the trench, watering,
Data -Parks
fixing the tree guard and maintaining the plants for one year -9
Ornamental trees 1 x 29 29.00 Nos 1550.80 1 Nos
5 RBR-HRTC-7: Planting permanent hedges including digging of trenches, 60
cm wide and 45 cm deep, refilling the excavated earth mixed with farmyard
manure, supplied at the rate of 4.65 cum per 100 metres and supplying and Data -Parks
planting hedge plants at 30 cm apart, and maintaining for 1 year - 7 (a)
as per Drawing 1 x 6 213.00 Rmt 222.40 1 Rmt
6 Planting palms including digging of pits 60cm. Cubes, loosening of 15cm.
Bottom red soil, filling with soil with 10 kg Compost + 100 DAP per pit staking
gap filling with in two month after planting.
inside the Lawns and other places 1 x 17 17 Nos 350.00 1 Nos
7 Planting Speciman plants including digging of pits 60cm. Cubes, loosening of
15cm. Bottom red soil, filling with soil with 10 kg Compost + 100 DAP per pit
staking gap filling with in two month after planting.
Golden bamboo 8” 1 x 10 10 Nos 862.50 1 No
Fercaria 2” 1 x 10 10 Nos 1437.50 1 No
Ficus 4” (Verites). 1 x 10 10 Nos 575.00 1 No
Bottle Bush 1 x 12 12 Nos 690.00 1 No
8 BLD-CSTN-2-1 (9) : Earth work excavation for foundations and depositing on
bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc.
Data- Bld -
complete for finished item of work including seigniorage excluding
1
dewatering charges etc as per SS - 20 B (APSS 308).
Around the Fountain 1 x 1 19.35 0.30 0.30 1.74
1.74 Cum Err:509 1 Cum
447524687.xlsx-Park-Mythrivanam 2132
Page 2133 of 2191
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
9 BLD-CSTN-3-6 ( 23 ) -Hand mixing up to Plinth Level : Plain Cement
concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse
aggregate ) using 40mm size Hard Granite Machine Crushed Metal including
cost and conveyance of all materials like cement, sand, coarse aggregate
water etc., to site , seigniorage charges on all materials, labour charges ,
for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface
to the required level curing etc., complete for finished item of work.for
foundation and under flooring bed. Data- Bld -
15
Wall foundations -- Around the fountation 1 x 1 19.35 0.30 0.10 0.58
Around the Fountain 0.58 Cum Err:509 1 Cum
447524687.xlsx-Park-Mythrivanam 2133
Page 2134 of 2191
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
10 BLD-CSTN-6-12-(67) : Construction of RR Masonary in Cement Mortor
( 1:8 ) Prop using hard granite stone including cost & Conveyance of all
materials like Cement, Sand , Water, Granite Stones, including Seigniorage
Charges on all Materials, ,labour charges for cutting Stones to required size
and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges
curing etc., complete for finished item of Work . Data- Bld -
38
Around the Fountain 1 x 1 19.35 0.30 0.20 1.16
1.16 Cum Err:509 1 Cum
11 BLD-CSTN-6-6-(61) ; Construction of CRS Masonary 2nd Sort in Cement
Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of
all materials like Cement, Sand , Water, Granite Stones, including
Seigniorage Charges on all Materials, ,labour charges for cutting Stones to
required size and shape, mixing of Cement Mortor, Construction, Scaffolding
Charges curing etc., complete for finished item of Work . Data- Bld -
37
Around the Fountain 1 x 1 19.35 0.30 0.60 3.48
Cladding to External walls with Granite stone tiles 8 mm thick (mirror 3.48 Cum Err:509 1 Cum
12 polished of all shades) using cement compatible bonding agent having
acrylic emulsion base set over 12mm thick CM (1:3) base coat and neat grey
cement slurry of honey like consistency spread at the rate of 3.3 kg.s per
sq.mt including fixing with MS clits with anticorrosive coating hold fasts and
using Janatha paste and jointed with white cement paste mixed with pigment
of matching shade to match the shade of granite slabs including cost and
conveyance of all materials and water to work site, including cost of
seigniorage charges on all materials and all operational, incidental, and
labour charges such as mixing mortar, fixing in position, including lift
charges, curing, including cutting the brick masonry walls and redoing the Data- Bld -
same such that the top surface of tiles is to be flushed with plastered 70
surface etc.,Fountain
Around the complete for finished item of work.(APSS No.701 & 707) 1 x 1 19.35 0.60 11.61
11.61 Sqm Err:509 1 Sqm
13 Providing seating area development by providing cast Iron /Cement seats
LS
as directed by Engineer incharge etc, complete.
Sub- Total for Greenary
Total of A+B
Total cost of the estimation Rs.
Say Rs.
447524687.xlsx-Park-Mythrivanam 2134
Page 2135 of 2191
PET MUNICIPALITY
n of Park at Mythrivanam
& ABSTRACT ESTIMATION
Amount
Err:509
Err:509
447524687.xlsx-Park-Mythrivanam 2135
Page 2136 of 2191
Amount
Err:509
Err:509
Err:509
Err:509
Err:509
447524687.xlsx-Park-Mythrivanam 2136
Page 2137 of 2191
Amount
Err:509
Err:509
447524687.xlsx-Park-Mythrivanam 2137
Page 2138 of 2191
Amount
Err:509
Err:509
Err:509
Err:509
447524687.xlsx-Park-Mythrivanam 2138
Page 2139 of 2191
Amount
Err:509
447524687.xlsx-Park-Mythrivanam 2139
Page 2140 of 2191
Amount
Err:509
Err:509
Err:509
Err:509
447524687.xlsx-Park-Mythrivanam 2140
Page 2141 of 2191
Amount
Err:509
447524687.xlsx-Park-Mythrivanam 2141
Page 2142 of 2191
Amount
Err:509
Err:509
Err:509
Err:509
29290.40
447524687.xlsx-Park-Mythrivanam 2142
Page 2143 of 2191
Amount
0.00
447524687.xlsx-Park-Mythrivanam 2143
Page 2144 of 2191
Amount
36607.42
44973.20
47371.20
5950.00
8625.00
14375.00
5750.00
8280.00
Err:509
447524687.xlsx-Park-Mythrivanam 2144
Page 2145 of 2191
Amount
Err:509
447524687.xlsx-Park-Mythrivanam 2145
Page 2146 of 2191
Amount
Err:509
Err:509
Err:509
253000.00
Err:509
Err:509
Err:509
Err:509
447524687.xlsx-Park-Mythrivanam 2146
Page 2147 of 2191
KODADA MUNICIPALITY
Construction of Park at Mythrivanam
PROVIDING Providing Parking inside the Park
S.N. Description of Item Nos L B D Quantity Unit Rate Per
1 RBR-FNDN-1 -manual means : Earthwork excavation for structures in all types of soil as
per drawing and technical specifications including setting out, construction of shoring
and bracing, removal of stumps and other deleterious material and disposal upto a lead
of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable
material as per Technical Specification 305 MORD / 304 MORTH. for Sumps,Thrust Data- Bld,
Sqm S.No. 7
blocks, column pits, Chambers and Man Holes etc. by manual means,
Parking place as per drawing 1 x 1 157.00 0.20 31.40
Drive Way 1 x 1 22.00 4.70 0.20 20.68
52.08 Cum 210.92 1 Cum
2 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and basement
with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer
by watering and ramming including cost and conveyance of water to work site and all
operational, incidental, labour charges, hire charges of T & P etc., complete for finished
item of work. (APSS NO. 309 & 310) Data- Bld -
10
Parking place as per drawing 1 x 1 157.00 0.10 15.70
For levelling the track between walls 1 x 1 22.00 4.60 0.10 10.12
25.82 Cum Err:509 1 Cum
3 BLD-CSTN-3-10- ( 27 ) Hand mixing: Plain Cement concrete nominal mix (1:3:6) prop
(Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine
Crushed Metal including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour charges , for
mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required
level curing etc., complete for finished item of work.for foundation and under flooring
bed.
Parking place as per drawing 1 x 1 157.00 0.10 15.70
Drive Way 1 x 1 22.00 4.60 0.10 10.12
25.82 Cum 4819.01 1 Cum
4 RBR-CCPV-13 - i : Providing and Laying of Interlocking Concrete Block Pavements
using PHOENIX or equivalent high strength Cement Concrete interlocking Regular
Pavers of 80 mm thickness of M- 30 Grade of which top 12 mm thick shall be for colour
pigmentation with imported colours and white cement to get required reflective glazing
inclusive of all taxes - as per drawing and Technical Specification Clause 1504 MORD Data- Bld ,
S.No 38
Parking place as per drawing 1 x 1 157.00 157.00
Amount
10985.00
Err:509
124427.00
Amount
122751.00
Amount
6297.00
1492.00
1793.00
Err:509
Err:509
Err:509
1 Solar Street Light System With Mounting Structure & Pole ( MNRE Specification
including installation / commissioning. Free delivery at site including freight &
forwarding. Insurance Standard Transit Insurance Clause.
a 2 X 11 W CFL (Single Luminaire with 2 CFL), PV Module: 120 W,Battery Capacity: Rate as per
12 V, 100 AH, Dusk to dawn automatic operation with Tubular battery with 5m pole. DGS & D. RC
Along the Path ways as per requirement 1 x 6 6 Nos 28870.00 1 each 173220.00
b 2 X 11 W CFL (Double Luminaire with 1 CFL each), PV Module: 120 W,Battery
Capacity: 12 V, 100 AH, Dusk to dawn automatic operation with Tubular battery with
5m pole.
Along the Compound wall as per requirement 1 x 5 5 Nos 32200.00 1 each 161000.00
c 1 X 11 W CFL,PV Module: 74 W,Battery Capacity: 12 V , 75 AH, Dusk to dawn
automatic operation with Tubular battery with 5m pole.
inside the premises. 1 x 5 5 Nos 20940.00 1 each 104700.00
For Earth work Excavation (seperate sheet enclosed) 1 x 16 16 Nos #REF! 1 each #REF!
Total Rs. #REF!
Total #REF!
Page 2154 of 2191
SIDDIPET MUNICIPALITY
Est-Borewells -2 2154
Page 2155 of 2191
Est-Borewells -2 2155
Page 2156 of 2191
Est-Borewells -2 2156
Page 2157 of 2191
Est-Borewells -2 2157
Page 2158 of 2191
Est-Borewells -2 2158
Page 2159 of 2191
Est-Borewells -2 2159
Page 2160 of 2191
Est-Borewells -2 2160
Page 2161 of 2191
Say Rs.
Est-Borewells -2 2161
Page 2162 of 2191
PET MUNICIPALITY
on of Park at Mythrivanam
27450.00
36600.00
#REF!
Est-Borewells -2 2162
Page 2163 of 2191
Amount
15700.00
Est-Borewells -2 2163
Page 2164 of 2191
Amount
6110.00
180.00
13530.00
Est-Borewells -2 2164
Page 2165 of 2191
Amount
#REF!
Est-Borewells -2 2165
Page 2166 of 2191
Amount
360.00
390.00
255.00
1825.00
95.00
2535.00
170.00
Est-Borewells -2 2166
Page 2167 of 2191
Amount
1050.00
Est-Borewells -2 2167
Page 2168 of 2191
Amount
1700.00
4250.00
120.00
2450.00
12316.00
Est-Borewells -2 2168
Page 2169 of 2191
Amount
20910.00
28063.00
#REF!
#REF!
Est-Borewells -2 2169
Page 2170 of 2191
SIDDIPET MUNICIPALITY
Construction of Park at Mythrivanam
S.No Description of Work Nos Length Width Depth Quantity Rate Per
6 Supply, Filling Sand in readymade trench including cost and
conveyance of all material and all labour charges etc for water
harvesting structure in complete shape. C-Mat
1 x 1 3.00 3.00 0.25 2.25 Cum #REF! 1 Cum
S.No Description of Work Nos Length Width Depth Quantity Rate Per
7 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain
Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded
Metal including cost and conveyance of all materials like cement, sand,
coarse aggregate water etc., to site , seigniorage charges on all
materials, labour charges , for mixing , laying, concrete , ramming in
15 cm layers, finishing top surface to the required level curing etc.,
complete for finished item of work with nomonal reinforcement
CC Bed below Brick wall - Below Long walls 1 x 2 3.46 0.30 0.05 0.10
CC Bed below Brick wall - Below Short walls 1 x 2 2.00 0.30 0.05 0.06
0.16 Cum 5044.84 1 Cum
8 BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or
treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost
& conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to
site cost of Seigniorage charges on all materials, including all labour
charges like mixing Cement Mortor, scaffoding charges lift charges ,
curing charges etc., complete for finished item of work
S.No Description of Work Nos Length Width Depth Quantity Rate Per
10 BLD-CSTN-3-16-(31)-C; Supply and placing of the M-20 Design Mix
Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER
with 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site and including Seigniorage charges, sales & other taxes on
all materials including all operational, incidental and labour charges
such as weigh batching, machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for
finished item of work (APSS No. 402)with minimum cement content as
per IS code from standard suppliers approved by the department
including pumping, centering, shuttering, laying concrete, vibrating,
curing etc. complete but excluding cost of steel and its fabrication
charges for finished item of work. for RCC SLABS, BEAMS
RCC Precast Perforated Slabs of 100mm thick 1 x 1 3.00 3.00 0.10 0.90 Cum 11093.79 1 Cum
11 BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/
Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe
415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC
works , including labour charges for straightening, cutting, bending to
required sizes and shapes, placing in position with cover blocks of
approved materials and size and tying and lap-splicing with binding
wire of 18 SWG, forming grills for reinforcement work as per approved
designs and drawings, including cost and conveyance of steel bars,
including all wastages such as overlaps, couplings, chairs, spacer bars
including cost and conveyance of binding wire, cover blocks and all
incidental, operational, labour charges such as cutting, bending,
placing in position, tying including sales and other taxes on all materials
etc., complete for finished item of work in all floors.( APSS No.126
for RCC Precast Perforated Slabs @ 40 Kg/Cum 1 x 1 0.090 50.00 Kg/Cum 4.50 Kg 68.71 1 Kg
DDIPET MUNICIPALITY
ction of Park at Mythrivanam
#REF!
#REF!
#REF!
#REF!
#REF!
Amount
#REF!
Amount
807.00
9328.00
1619.00
Amount
9984.00
309.00
#REF!
#REF!
Amount
42.00
91.04
482.00
760.00
Amount
286.00
68.00
11.00
1740.04
1740.04
0.02 Lakhs
Unit = cum
Taking output = 195 cum (450 tonnes)
a) Labour
Mate day -
Mazdoor (Unskilled) working with HMP, mechanical broom, day 16.000 510.000
paver, roller, asphalt cutter and assistance for setting out
lines, levels and layout of construction
Skilled mazdoor for checking line & levels day 5.840 540.000
b) Machinery
Batch mix HMP @ 75 tonne per hour hour 6.000 24268.160
Paver finisher hydrostatic with sensor control @ 75 cum per hour hour 6.000 3426.651
c) Materials
Bitumen @ 4.25 per cent of weight of mix t 19.130 31710.000
Aggregate
Total weight of mix = 450 tonnes
Weight of bitumen = 19.13 tonnes
Weight of aggregate = 450 -19.13 = 430.87 tonnes
Taking density of aggregate = 1.5 ton/cum
Volume of aggregate = 287.25 cum
Grading - II 19 mm (Nominal Size)
25 - 10 mm 30 per cent cum 86.160 1084.950
10 - 5 mm 28 per cent cum 80.430 859.950
5 mm and below 40 per cent cum 114.900 774.950
Filler @ 2 per cent of weight of aggregates (Cement). t 8.620 4750.000
Any one of the alternative may be adopted as per approved
design
Total
d&e) Overheads & Contractors Profit 13.62%
Cost for 195 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/195
14 Providing and laying of Dense Graded Bituminous Macadam with 100 - 120 TPH batch type hot mix plant producing an
average output of 75 tones per hour using hard blasted granite crushed aggregates of Grading - II as per table 500-10
of MoRT&H Specification 505 (5th revision) premixed with bituminous binder of VG 30 grade @ 4.50% of weight of total
mixture, transported to site, laid over a previously prepared surface with a hydrostatic paver finisher with sensor control
to the required grade, level and alignment and rolled as per Clauses 501.6 and 501.7 to achieve the desired compaction
for finished item of work as directed by the Engineer-in-Charge including hire and operational charges all T&P and all
other contingent charges necessary including cost of (excluding seigniorage) charges of all materials etc., complete in all
respects as directed by Engineer-in-Charge and as per MoRT&H specification No. 505 (5th Revision)
3.90 hour Vibratory roller 8 tones for intermediate rolling 2878.90 hour 11227.71
3.90 hour Finish rolling with 6-8 tones smooth wheeled tandem roller 1843.52 hour 7189.73
Unit = cum
Taking output = 191 cum (450 tonnes)
a) Labour
Mate day -
Mazdoor (Unskilled) working with HMP, mechanical broom, day 16.000 510.000
paver, roller, asphalt cutter and assistance for setting out
lines, levels and layout of construction
Skilled mazdoor for checking line & levels day 5.840 540.000
b) Machinery
Batch mix HMP @ 75 tonne per hour hour 6.000 24268.160
Paver finisher hydrostatic with sensor control @ 75 cum per hour hour 6.000 3426.651
15
Page 138,139,140 of MoRT&H SDB
Unit = cum
Taking output = 191 cum (450 tones.)
(A) Labour
0.84 nos. Mate 540 nos. 453.60
8160.00
3153.600
145608.960
20559.910
12432.000
11061.120
43200.000
5234.970
11227.710
7189.730
606612.300
93479.290
69165.780
89041.760
40945.000
1167072.130
158896.870
1325969.000
6799.840
8160.000
3153.600
145608.960
20559.910
12432.000
11061.120
5234.970
11227.710
7189.730
713475.000
84961.350
61271.440
94970.120
40945.000
1220250.910
166137.161
1386388.071
7258.580