KODADA MUNICIPALITY
DATA BASED ON - 2018 - 2019 SSR
DETAILED & ABSTRACT ESTIMATION
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
1 BLD-CSTN-2-1 (9): Earth work excavation and depositing on bank for all lifts
and with an initial lead of 10m including all operational, incidental, labour
charges such as shoring ,sheeting, planking, strutting, etc. complete for
finished item of work including seigniorage excluding dewatering charges etc
as per SS - 20 B (APSS 308). Data- Bld -
1
a For Lamp Post 1 x 1 0.45 0.45 1.000 0.20
0.20 Cum 369.10 1 Cum
2 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level :
Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate:
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work.for foundation and under flooring bed. Data- Bld -
12
For Lamp Post 1 x 1 0.45 0.45 1.000 0.20
Total Qty 0.20 Cum 3785.55 1 Cum
3 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain
Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work with nomonal reinforcement Data- Bld -
18
a For Lamp Post 1 x 2 0.30 0.300 0.300 0.05
0.05 Cum 5044.84 1 Cum
Total of A+B+C+D+E
0.7855 Say Rs.

447524687.xlsx-Excavation data 1
Page 2 of 2191

Amount

74.00

757.00

252.00
1083.00
0.01 Lakhs

447524687.xlsx-Excavation data 2
Page 3 of 2191 Main sheet

Name of the ULB KODADA MUNICIPALITY


Name of the Scheme Construction of Divider and central lighting

Municipal allowence on Labour Component 20%


SBC - T/Sqm 15
Wind Pressure in Miles/Second 44 Kodada
Wind Pressure in Kg/Sqm 200
Sesmic Zone Zone-II
Water charges - Urban 98.00
Rural area allowence for WTP 0%

Leads for the Material as per Lead statement


Sand for filling 15 Km
Sand for Concrete 68 Km
Sand for Mortar 68 Km
Mooram & Gravel 5 Km
Stone 10 Km
Metal 10 Km
Bricks 5 Km
DI pipes 615 kms

SSR Data Based on 2018-19 SSR


Month Sep-18

Material cost ( Telangana State )


Description as per SSR Ref Market Rate Unit
for
1 Cement Telangana Sep-18
OPCement- 43/53 grade 4600.00 Pg-11 4600.00 MT
Portland Pozzolana Cement 4500.00 4500.00 MT
Portland Slag Cement 4200.00 4200.00 MT
2 STEEL
a 6mm MS rods 46000.00 Pg-20/ PH 46000.00 MT
b M.S.Flats 44500.00 SN.69/ Pg.22 44500.00 MT
c Mild Steel, structural steel, i.e. 44500.00 SN.68/ Pg.22 44500.00 MT
Angles,channels and "I" sections
d MS.Plates 47500.00 47500.00 MT
3 TMT/HYSD bars
Fe-500/500D/550D
From - TATA, SAIL, VSP, JINDAL 46000.00 SN.62/ Pg.14 46000.00 MT
4 HSCR steel Bars-Fe-500 MT
PUBLIC HEALTH ITEMS
5 PC drawn wire/HT wire 3mm 57000.00 Pg-35/ PH 57000.00 MT
6 PC drawn wire/HT wire 4mm 56000.00 56000.00 MT
7 HR sheet in coils 1.6mm 51000.00 Pg-38/ PH 51000.00 MT

8 HR sheet in coils 2.0mm 50000.00 50000.00 MT


9 5.5/6.0mm MS wire rod coil 0.00 Pg-40/ PH MT

Main sheet
Page 4 of 2191 Main sheet

10 Foundry grade Pig Iron(3.00 to 2.24) 35000.00 Pg-62/ PH 35000.00 MT


excluding taxes
Coke (as per 2014-15 SSR) 4500.00 Pg-70/ PH 4500.00 MT

Main sheet
Page 5 of 2191 Main sheet

Other rates SoR


Fiber 78500 2018-19
resin cost for PE - 80 grade 98750 2018-19
resin cost for PE- 100 grade 114900 2018-19
resin cost for PVC pipe 78860 2018-19
Taxes ;ST,CED etc,.
Sales Tax 0.00%
Central Excise Duty 0.00%
APGST (on Valves etc,.) 0.00%
Over heads & Contractors Profit 13.615%
VAT 0.00%
Labour cess 0.00%
Total of VAT & LC 0.00%
cost variation during execution 0.00%

Structural steel fabrication SN.15/ Pg.23 1 Kg


Water charges (Rural) - Irri-SoR- 73.00 M-189 1 Kl
Water charges (Urban) - Irri-SoR- 98.00 M-189 1 Kl
Gelatin 80 per cent - M-104
Electric Detonators @ 1 detonator for 2
gelatine sticks of 285 gm each -M-094

Main sheet
Page 6 of 2191 Main sheet

Material cost ( Telangana State )


Used for Farmule

RCC pipes R1+R2

PSC-NC R1+R2

PSC-C & R1+R2+R3.


BWSC

BWSC R1+R2+R3.

Main sheet
Page 7 of 2191 Main sheet

CI & DI

CI Spe

Main sheet
Page 8 of 2191 Main sheet

AC pipes W x 0.85 x IC
HDPE-80
HDPE-100
PVC

Main sheet
Page 9 of 2191

KODADA MUNICIPALITY

Construction of Divider and central lighting

#REF!

S No Measurements
Description Nos Qty Rate Per
L B D
A Formation of CC Road
Total Earth work excavation quantity including Rock for sectioning and
* levelling the ground along the alignment.
for widening the existing 6.00m wide CC Road to 11.00m 1 x 2 60.00 4.10 0.400 196.80
Ch.60m to 1500m for formation of 11.00m wide CC Road 1 x 1 1740.00 12.20 0.400 8491.20
8688.00 Cum
1 Earthwork excavation in soils upto SDR by mechanical means including
trimming bottom and side slopes in accordance with requirements of lines ,
grades and cross sections etc., complete for finished item of work for
trench cutting as per MoRT&H specification 301(5th Revision) and as data-
directed by the Engineer-in-Charge MoRTH--Sn.3

EWE in ordinary soils for levelling the land along the alignment - 90% 7819.00 Cum 56.00 1 Cum
2 Excavation for roadway in ordinary rock with hydraulic excavator of 0.9
cum bucket capacity including cutting and loading in tippers, transporting
to embankment site with all lifts and lead beyond 100 m & upto 1000 m,
trimming bottom and side slopes in accordance with requirements of lines,
grades and cross-sections as per Technical Specification Clause 302.3.5
MORD / 301 MORTH
EWE in rocky soils- ordinary rock by Hydraulic excavator 8% 695.00 Cum #REF! 1 Cum
3 Excavation for roadway in hard rock (blasting prohibited) with rock
breakers including breaking rock, loading in tippers and disposal with initial
lift of 3 mts and lead upto 1000 metres, trimming bottom and side slopes in
accordance with requirements of lines, grades and cross- sections as per
Technical Specification Clause 302.3.5 MORD / 301 MORTH

EWE in in hard rock requiring blasting by mechanical means 2% 174.00 Cum #REF! 1 Cum

447524687.xlsx - 1. CC Road- HB Colony


Page 10 of 2191

S No Measurements
Description Nos Qty Rate Per
L B D
4 Granular sub-base/base/surface course with local materials (Table 400.13)
by mix in place method normal Construction of granular sub-base by
providing local material spreading in uniform layers with motor grader on
prepared surface, mixing by mix in place method with rotavator at once
and compacting with smooth wheel roller to achieve the desired density data- road-
complete as per Clause 401.4 as per Technical Specification Clause 408 Sn.76
MORD.
for widening the existing 6.00m wide CC Road to 11.00m 1 x 2 60.00 4.10 0.10 49.20
Ch.60m to 1500m for formation of 11.00m wide CC Road 1 x 1 1740.00 12.20 0.10 2122.80
2172.00 Cum 902.30 1 Cum

447524687.xlsx - 1. CC Road- HB Colony


Page 11 of 2191

S No Measurements
Description Nos Qty Rate Per
L B D
5 Providing Dry lean cement concrete Sub- base over a prepared sub-grade
with coarse and fine aggregate conforming to IS: 383, the size of coarse
aggregate not exceeding 25 mm, aggregate cement ratio not to exceed
15:1, aggregate gradation after blending to be as per table 600-1, cement
content not to be less than 150 kg/ cum, optimum moisture content to be
determined during trial length construction, concrete strength not to be
less than 10 Mpa at 7 days, mixed in a batching plant, transported to site,
laid with a paver with electronic sensor, compacting with 8-10 tonnes
vibratory roller, finishing and curing complete for finished item of work as
per MoRT&H (5th Revision) specification 1500,1700 & 601 (5th Revision)
and as directed by the Engineer-in-Charge for base coarse below CC
Pavement. data- road-
Sn.20

for widening the existing 6.00m wide CC Road to 11.00m 1 x 2 60.00 4.10 0.10 49.20
Ch.60m to 1500m for formation of 11.00m wide CC Road 1 x 1 1740.00 12.20 0.10 2122.80
2172.00 Cum 2883.22 1 Cum
6 Construction of un-reinforced, dowel jointed, plain cement concrete
pavement over a prepared sub base with 43 grade cement @ 400 kg per
cum, coarse and fine aggregate conforming to IS 383, maximum size of
coarse aggregate not exceeding 25 mm, mixed in a batching and mixing
plant as per approved mix design, transported to site, laid with a fixed form
or slip form paver, spread, compacted and finished in a continuous
operation including provision of contraction, expansion, construction and
longitudinal joints, joint filler, separation membrane, sealant primer, joint
sealant, debonding strip, dowel bar, tie rod, admixtures as approved,
curing compound, finishing to lines and grades as per drawing complete
for finished item of work as per MoRT&H (5th Revision) specification
1500,1700 & 602 (5th Revision) and as directed by the Engineer-in- data- road-
Charge Sn.21

for widening the existing 6.00m wide CC Road to 11.00m 1 x 2 60.00 4.10 0.200 98.40
Ch.60m to 1500m for formation of 11.00m wide CC Road 1 x 1 1740.00 12.20 0.200 4245.60
4344.00 Cum 5743.89 1 Cum

447524687.xlsx - 1. CC Road- HB Colony


Page 12 of 2191

S No Measurements
Description Nos Qty Rate Per
L B D
7 Forming earthen shoulders with selective soils obtained from side earth
having MDD of not less than 1.75 gms/cc by mechnical means with all
leads and lifts including pre-watering of soil at borrow area, removal of top
soil, excavation of soils at borrowed area, conveyance of soil, depositing
the soils on the embankment, spreading soils, breaking clods, sectioning
and consolidation with vibratory road roller @ OMC to meet requirement of
table 300-2 of MORT&H including all hire and operational charges of T&P ,
complete for finished item of work as per MORT&H specification 305 (5th data- road-
revision) (Payment will be made based on levels for finished item of work) Sn.54

for formation of Shoulders 1 x 2 1800.00 1.00 0.15 540.00


540.00 Cum 136.02 1 Cum
Cost of CC Road
Say Rs.

447524687.xlsx - 1. CC Road- HB Colony


Page 13 of 2191

S No Measurements
Description Nos Qty Rate Per
L B D
B Construction of Median with CRS Walls 1.20 m wide
1 BLD-CSTN-2-2(10):Earth work excavation in Ordinary soils by
Mechcanical Means-Upto 3 m depth for foundations and depositing on
bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting,
etc. complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308).
for construction of CRS walls on both sides of the Median 1 x 2 1800.00 0.50 0.40 720.00
720.00 Cum 105.85 1 Cum
2 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level:
Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate:
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work.for foundation and under flooring bed.

below CC walls on both sidesof the Median 1 x 2 1800.00 0.50 0.10 180.00 Cum 3785.55 1 Cum
3 BLD-CSTN-6-5-(60) : Construction of CRS Masonary 1st Sort in Cement
Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance
of all materials like Cement, Sand , Water, Granite Stones, including
Seigniorage Charges on all Materials, ,labour charges for cutting Stones
to required size and shape, mixing of Cement Mortor, Construction,
Scaffolding Charges curing etc., complete for finished item of Work .

CRS walls on both sides of the Median 0.36m below GL and 0.75m
1 x 2 1800.00 0.300 1.05 1134.00 Cum 4605.86 1 Cum
above GL
4 BLD-CSTN-7-3-(74) : Providing raised or Cut Cement Pointing on coursed
or Ashlar stone masonry or concrete block walling in white cement mortar
1 : 3 (1 white cement : 3 marble dust).including cost & conveyance of all
materials to site , seignaiorage charges on all materials, labour charges
on all materials, curing etc., Complete for finished item of work

on outer sides of the CRS walls above GL ( 0.75 sides) 1 x 2 1800.00 0.75 2700.00 Sqm 234.88 1 Sqm

447524687.xlsx - 1. CC Road- HB Colony


Page 14 of 2191

S No Measurements
Description Nos Qty Rate Per
L B D
5 BLD-CSTN-3-21 - (33) - Damp proof course 50mm thick with cement data- road-
concrete (1:2:4 Nominal mix), using 12mm hard broken stone aggregate Sn.51
including cost of all materials, seigniorage charges, excluding conveyance
charges of materials, including the cost of machinery, labour charges,
mixing, placing in position, leveling, vibrating, curing etc. complete for
finished item of work. (Using concrete mixer)

Coping over the CRS walls 1 x 2 1800.00 0.35 1260.00 Sqm 264.23 1 Sqm
6 BLD-CSTN-2-9 (17) : Filling with useful available excavated earth
(excluding rock) in trenches, sides of foundations and basement with initial
lead in layers not exceeding 15 cm thick, consolidating each deposited
layer by watering and ramming including cost and conveyance of water to
work site and all operational, incidental, labour charges, hire charges of T
& P etc., complete for finished item of work. (APSS NO. 309 & 310) data- road-
Sn.74

for filling in side the median with available excavated earth. 1 x 1 1800.00 0.60 0.60 648.00 Cum 29.94 1 Cum
7 Imporatation of good quality red earth congenial for plants grouth of light
textured, crystalline, porous and friable, generally acidic or neutral but not
alkaline, fertile, cost, transportation, loading, unloading etc complete
for filling in side the median with red earth ( Top Layer) 1 x 1 1800.00 0.60 0.15 162.00 Cum 1231.59 1 Cum
8 RBR-HRTC-1: Spreading of sludge farm yard manure or/ and good earth
data- road-
in required thickness (cost of sludge, farm yard manure or/and good earth
Sn.75
to be paid for separately) as per Specification 307 MORTH
Quantity as per collection 162.00 Cum 0.00 1 Cum
B. Cost of Median
Say Rs.
C Construction of Foot paths
9 BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual
Means- for structures in all types of soil as per drawing and technical
specifications and depositing on bank for all lifts and with an initial lead of
10m including all operational, incidental, labour charges such as shoring
,sheeting, planking, strutting, etc. complete for finished item of work
including seigniorage excluding dewatering charges etc as per SS - 20 B
(APSS 308).

for Footpath walls 2 x 2 1800.00 0.25 0.20 360.00 Cum 210.92 1 Cum

447524687.xlsx - 1. CC Road- HB Colony


Page 15 of 2191

S No Measurements
Description Nos Qty Rate Per
L B D
10 RBR-TSRA-29 : Cast in Situ Cement Concrete M20 Kerb: Construction of
cement concrete kerb with top and bottom width 115 and 165 mm
respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation
150 mm thick, foundation having 50 mm projection beyond kerb stone,
kerb stone laid with kerb laying machine, foundation concrete laid
manually, all complete as per clause 408 MORTH

for Footpath walls 2 x 2 1800.00 7200.00 Rmt 286.24 1 Rmt


11 BLD-CSTN-2-9 (17) : Filling with useful available excavated earth
(excluding rock) in trenches, sides of foundations and basement with initial
lead in layers not exceeding 15 cm thick, consolidating each deposited
layer by watering and ramming including cost and conveyance of water to
work site and all operational, incidental, labour charges, hire charges of T
& P etc., complete for finished item of work. (APSS NO. 309 & 310)

Filling in footpaths 1 x 2 1800.00 1.67 0.075 450.90 Cum 29.94 1 Cum


12 Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG
crushed stone aggregate and fine aggregate conforming to table 1000-2 of
MoRT&H including cost, conveyance of all materials to site and labour
charges, centering, machine mixing, laying, Vibrating, curing etc.,
including all other incidental and operational charges of all T&P etc.,
complete for finished item of work as per MoRT&H specification
1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-
Charge for base coarse.

Filling in footpaths below CC Blocks 1 x 2 1800.00 1.70 0.075 459.00 Cum 3680.73 1 Cum
13 RBR-CCPV-13 - ii: Providing and Laying of Interlocking Concrete Block
Pavements using precast concrete blocks for paving of M-35 grade and
thickness not less than 60 mm for Light traffic areas conforming to IS
15658:2006 in all shapes and designs as per the manufacturer's
Specification including cost and conveyance of all material and all labour
charges etc,. complete.

for Foot paths 1 x 2 1800.00 1.77 6372.00 Sqm 570.70 1 Sqm


14 Painting two coats after filling the surface with synthetic enamel paint in all
shades on new plastered concrete surfaces
for CC Kerb walls- above ground level (0.2+0.115)m 2 x 2 1800.00 0.32 2268.00 Sqm 71.03 1 Sqm

447524687.xlsx - 1. CC Road- HB Colony


Page 16 of 2191

S No Measurements
Description Nos Qty Rate Per
L B D
15 Supply and fixing in position of MS Gratings in Drain CC walls including
cost and conveyance of all material and all labour charges etc,. Complete.

MS Grating of 0.30m x 0.15m size @ every 10m on both sides 2 x 180 0.30 0.15 16.20 Sqm
MS Gratings @ 1.20 Kg/ 0.45 Sqm 19.44 Kg 78.52 1 Kg
16 TBSP-H.I-01:Supplying and fixing of SWR PVC pipes (as per ISI
standards) 4 Kg/Sq.cm. and fixing including cost and conveyance of all
materials to site, labour charges etc.complete for finished item of work.

90mm dia PVC 4 Kg cm2 pipe 2 x 180 2.25 810.00 Rmt 141.01 1 Rmt
C. Cost of Footpaths
Say Rs.

447524687.xlsx - 1. CC Road- HB Colony


Page 17 of 2191

S No Measurements
Description Nos Qty Rate Per
L B D
D Construction of CC Drain
1 BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual
Means- for structures in all types of soil as per drawing and technical
specifications and depositing on bank for all lifts and with an initial lead of
10m including all operational, incidental, labour charges such as shoring
,sheeting, planking, strutting, etc. complete for finished item of work
including seigniorage excluding dewatering charges etc as per SS - 20 B
for CC Drains
(APSS 308). on both sides of the road 1 x 2 1800.00 1.10 1.05 4158.00
for RCC culverts 1 x 12 10.00 1.20 1.25 180.00
4338.00 Cum 210.92 1 Cum
2 RBR-FNDN-4 : B-i : .Providing concrete for plain/reinforced concrete in
open foundations using 40 mm nominal size Graded hard stone
aggregate, mechanically mixed, placed in foundation and compacted by
vibration including curing for 14 days complete as per drawings and
technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500,
1700 & 2100 MORTH. : P.C.C grade M 15 (Design Mix) MORTH 12.8 A
using 40 mm Graded Metal

for CC Drains on both sides of the road 1 x 2 1800.00 1.10 0.10 396.00
for RCC culverts 1 x 12 10.00 1.20 0.15 21.60
417.60 Cum 4733.96 1 Cum
3 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and
10mm size HBG crushed stone aggregate (Coarse aggregate conforming
to table 1000-1 and fine aggregate conforming to table 1000-2) including
cost and conveyance of all materials to site and all labour charges for
machine mixing,laying in position, Compacting , Vibrating and curing
including all other incidental and all other operational charges of T&P
required etc., complete as per MoRT&H Specification 1500,1700, 2100
(5th Revision) for footings and Raft foundation .

Below Vent portion of CC Drains 1 x 2 1800.00 1.00 0.10 360.00


Below Vent portion of Culvers 1 x 12 10.00 1.10 0.15 19.80
379.80 Cum 3924.09 1 Cum

447524687.xlsx - 1. CC Road- HB Colony


Page 18 of 2191

S No Measurements
Description Nos Qty Rate Per
L B D
4 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and
10mm size HBG crushed stone aggregate (Coarse aggregate conforming
to table 1000-1 and fine aggregate conforming to table 1000-2) including
cost and conveyance of all materials to site and all labour charges for
machine mixing, laying in position,Compacting, Vibrating and curing
including all other incidental and all other operational charges of T&P
required etc., complete as per MoRT&H Specification 1500,1700, 2200
(5th Revision) for Sub structure .

Drain walls 2 x 2 1800.00 0.275 0.600 1188.00


Culvert Walls 2 x 12 10.00 0.325 0.600 46.80
1234.80 Cum 4150.48 1 Cum
5 Vibrated reinforced cement concrete M 20 grade using 20mm & 10mm
HBG crushed stone aggregate (Coarse aggregate conforming to table
1000-1 and fine aggregate conforming to table 1000-2) including cost,
conveyance of all materials to site and labour charges, centering, machine
mixing, laying, vibrating, curing etc., including other incidental hire and
operational charges of all T&P as per approved drawings and as directed
during execution but excluding cost of steel and its fabrication charges for
finished item as per MoRT&H specification 1500,1600,1700 & 2200 (5th
revision ) and as directed by the Engineer-in-Charge for Cover slabs over
side drains
RCC slabs over culverts 1 x 12 10.00 1.10 0.200 26.40 Cum 4488.99 1 Cum
6 Plastering in CM (1:5) 12 mm thick including cost and conveyance of all
materials , labour charges , curing etc complete for finished item of work
as directed by the Engineer -in-Charge
Drain inner walls 2 x 2 1800.00 1.600 11520.00
Drain bottom 2 x 1 1800.00 0.3 1080.00
12600.00 Sqm 76.97 1 Sqm
7 BLD-CSTN-2-9 (17) : Filling with useful available excavated earth
(excluding rock) in trenches, sides of foundations and basement with initial
lead in layers not exceeding 15 cm thick, consolidating each deposited
layer by watering and ramming including cost and conveyance of water to
work site and all operational, incidental, labour charges, hire charges of T data- road-
& P etc., complete for finished item of work. (APSS NO. 309 & 310) Sn.74

Total EWE Qty 4338.00 Cum


Deduct CC Bed Qty -417.60

447524687.xlsx - 1. CC Road- HB Colony


Page 19 of 2191

S No Measurements
Description Nos Qty Rate Per
L B D
Deduct Drain vent Qty -379.80
Deduct Drain Qty -1 x 2 1800.00 1.00 0.60 -2160.00
Deduct Culvert Qty -1 x 12 10.00 1.10 0.60 -79.20
for filling in side the foot paths with available excavated earth. 1301.40 Cum 29.94 1 Cum
8 Providing HYSD bars ( Fe-415 ) of different diameters, wrought and put up
bars of all diameters including cost and conveyance of steel to site and all
labour charges for fabrication of reinforcement including cutting, bending,
binding rods, tying grills, placing them in position etc., complete including
cost and conveyance of binding wire and all handling charges and
operational charges etc., and including over lapping welding if required
etc., complete for all R.C.C items for finished item of work as per standard
drawings, as per the directions of the Engineer-in-Charge and as per
MoRT&H specification 1600 & 2200 (5th revision) and as per I.S.1786
of 1985 for Sub structure of R.C.C items.

Steel for RCC culvert slabs @ 120Kgs for Cum of RCC 26.40 120.00 Kg/cum 3168.00 kg 56.71 1 kg
D. Cost of CC Drains
Say Rs.
E Providing Central Lighting
1 ELEC-7.2.3 : Fabrication, Transportation and supply of hot-dip galvanized
Octogonal Pole with BSEN -10025 grade S 355 JO steel plate for shaft, IS
2062 for base plate with door opening arrangement, including the supply
of suitable boards with bakelite sheet and MCB's as per IS specification
suitable to withstand the wind speed of 180 KMPH for 9mtrs height Pole
having dimensions Bottom 155mm, Top 70mm with 3mm thick, base
plate 260 x260 x16mm and 4 Nos of M24 x 750 long 'J' bolts along with
template ofMakes: Bajaj / Valmont / TRANSRAIL
1 x 51 51 Nos #REF! 1 Nos
2 ELEC-7.3.3 : Fabrication, Transportation and supply of of 1.5mtrs
sword type decorative double arm bracket with dooms either sides
complete with all accessories with MS galvanized 50mm dia Pipe.
1 x 51 51 Nos #REF! 1 Nos

447524687.xlsx - 1. CC Road- HB Colony


Page 20 of 2191

S No Measurements
Description Nos Qty Rate Per
L B D
3 ELEC-7.9.3 : Foundation and erection charges with special T&P, for
9.00Mtrs / 10Mtrs long Octagonal / Conical pole duly erecting on base
plate duly providing 4 Nos foundation bolts with nuts with providing of
0.60Mtr x 0.60Mtrs x 1.40 Mtr size M20 cc work vibrated concreting mixing
with necessary steel (15kgs) reinforcement as directed by the field
engineers during execution including all labour charges and cost and
conveyance of materials etc. complete
1 x 51 51 Nos #REF! 1 Nos
4 ELEC-4.1.10 : Supply of 10 Sqmm 4 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part
- I) of Makes : RPG / Finolex / Paragon / V-Guard / Fortune Art / Suncab /
Finecab / Gemscab / Payal.
4 Core 10 Sqmm 1 x 1 1785 1785 Rmt #REF! 1 Rmt
5 ELEC-4.1.12 : Supply of 16 Sqmm 4 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part
- I) ofMakes : RPG / Finolex / Paragon / V-Guard / Fortune Art / Suncab /
Finecab / Gemscab / Payal.
4 Core 16 Sqmm 1 x 1 128 128 Rmt #REF! 1 Rmt
6 ELEC-4.8.2 : Supply and Transportation of Outer dia 63mm and Inner dia
51mm double walled corrugated HDPE duct made as per specification
BSEN - 500 86/IS 14930 Part-II. Makes:DURA LINE (Dura Guard) or its
equivalent make.
51mm dia DWC pipe 1 x 1 1785 1785 Rmt #REF! 1 Rmt
7 Supply and erection of the feeder pillar box of MS sheet of 14 SWG 110 X
700 X 250 mm in size and painted with 2 coats of red oxide and two coats
of synthetic enamel paint of light gray shade (or power coated). The FPB
should be out door type, dust and vermin proof, confirming to IP – 55
degree of protection as per IS – 2147. The inner door of the box should be
having an interlocking arrangement. Single compression cable glands and
crimping type lugs shall be carried out with copper standard conductor,
flexible PVC insulated 1100 V grade wire. The FPB should consists the
following.

LS

447524687.xlsx - 1. CC Road- HB Colony


Page 21 of 2191

S No Measurements
Description Nos Qty Rate Per
L B D
a) Out door with concealed hinges and neoprene sponge gasket.
b) Hinged inner door.
c) MS bracket for pad locking facility with Canopy.
d) 3 Nos siemen’s type door lock with key on outer door.
e) Dancer notice plate.
f) MS base channel 50 x 50 x 3 mm thick and 2 Nos thumb screws.
g)1 No Micro processed based electronic timer.
h) 3 Nos 63 A HRC fuses EE or equivalent make. LS
k) 4 Nos 60 A TPN MCB’s as out going MDS / Havell’s
l) 4 Nos 25 x 6mm thick alluminium bus bars for R.Y.B phases and neutral
mounted rigidly on suitable insulators.
m)1 No 110 A Contactor (ML – 6) L&T make.
n) 1 No kaycee make auto / mannual switch.
o) Removable undrilled MS painted cable gland plate.
p) MS base plate for mounting switch gear components.
q) 4 Nos foundation holes in base channel to suit M 12 foundation bolts.
r) 4 Nos 4 way terminal blocks for outgoing cricuits open barrier type
balson / Everest / Essen or equivalent make (1 No. 100 A four way
terminal block for incoming open barriers type or balson / everest / essen
or equivalent make.
s) 2 Nos earthing studs (M10) with nut and spring washer etc,.

1 x 3 3 job 32000 1 job


8 ELEC-10.7.51 :Supply of 3 Core x 2.5 Sqmm FRLS armoured copper
cable as per IS. 7098 / Part-I / 1988 including all taxes etc., complete of
make Universal/ CCI /Unicab/Polycab / Finolex / KEI / Havells.
3 Core x 2.5 Sqmm FRLS armoured copper cabl 1 x 1 1148 1148 Rmt #REF! 1 Rmt
9 ELEC-4.4.1 : Supply and fixing of crimping type copper lugs confirming to
I.S specifications for cable upto 16 Sq.mm including nuts and bolts with
connections
Copper lugs 1 x 408 408 Nos #REF! 1 Nos
10 ELEC-4.3.5 : Supply and Fixing of single compression brass cable glands
for 4 core XLPE armoured cable up to 16.0 Sq.mm with brass washers
complete.
Brass cable glands 1 x 6 6 Nos #REF! 1 Nos
11 ELEC-9.1.56 : Supply and laying of 40mm Nominal Bore medium grade
G.I.Pipe including cost and conveyance etc, complete.

447524687.xlsx - 1. CC Road- HB Colony


Page 22 of 2191

S No Measurements
Description Nos Qty Rate Per
L B D
40mm Nominal Bore medium grade G.I.Pipe 1 x 1 102.00 102 Rmt #REF! 1 Rmt

447524687.xlsx - 1. CC Road- HB Colony


Page 23 of 2191

S No Measurements
Description Nos Qty Rate Per
L B D
12 ELEC-3.5.1: Supply & Installtion of Automatic Street Light Control System
with Optical Sensor, Low volatage / High voltage trip and reset, operating
voltage 150 - 280V AC, 50 HZ with suitable SMC enclousure of IP 54
protection, MCBs and contactor suitable to control the load of 3 KW of
single phase load with necessary clamping arrangements. Makes :
Swadeep Nature Switch / Light Mate.
1 x 1 1 No #REF! 1 No
13 BLD-ELEC-5-1-1 : Providing independent earthing for sophisticated
equipment like computer medical Equipment, Electronic Gadgets etc., with
600mm x 600mm x3.15 mm thick copper plate rigidly fixed to the 40mm
dia GI pipe of 2.5 Mtrs. Length and 19mm dia ‘B’ class GI pipe of 0.3 M
long connected with reducer providing GI funnel covers with wire mesh of
suitable size staggered holes of 16 Nos of 12mm dia to the earht
electrode, enclosed in a CC chamber of 400mm x 400mm x 400mm
covered with reinforced cement concrete cover and all labour charges
RCC slab cover duly filing salt and charcoal in layers from the bottom of
the earth pit, giving earth connections from the electrodes to GI strip 25 x
6 x 200mm length provided with holes GI washers, boths and labour 1 x 3 3 Nos 3906.33 1 Nos
charges etc., complete.
14 BLD-ELEC-7-4-2 : Supply and erection of Integral street light luminaire of
150W MH lamp fitting comprises of single piece die cast Aluminium body
with copper wound ballast and capacitor, Ignitor, with pot optics including
150W MH lamp etc., complete.
150W MH lamps 2 x 51 102 Nos 5538.73 1 Nos
15 Laying of PVC armoured under ground cable in existing duct as directed
by the department including cost and conveyance of all materials and
labour charges etc., complete.
Armoured cable 1 x 1 1964 1964 Rmt 15.00 1 Rmt
16 Laying of 63mm and Inner dia 51 mm double walled corrugated HDPE
as directed by the department including cost and conveyance of all
materials and labour charges etc., complete.
Laying DWC pipe in Median 1 x 1 1785 1785 Rmt 15.00 1 Rmt
17 Supply of 6-32A !OKA SP MCB, C/D Curve ISI Mark. Makes : Legrand-
DX3 / Schneider-Acti9 / Siemens / L&T / Exora. As per SSR No:
ELEC2.9.1, SI.4No:
Supply of 63A Way282
Connector 1 x 102 102 Nos #REF! 1 Nos
18 Supply and Run of No.8 SWG G.1 wire including cost of all accessories
and labour charges etc., complete.
1 x 459 459 Rmt #REF! 1 Rmt

447524687.xlsx - 1. CC Road- HB Colony


Page 24 of 2191

S No Measurements
Description Nos Qty Rate Per
L B D
19 Fabrication supply and errection of water tight M.S junction Box 260 x 300
x 140 mm (depth) size and 16 guage MS sheet with fixing arrangements,
with necessary holes for cable entry and exit from the box. The box shall
be provided with cover and hinges on one side and bolting at other end.
The box shall be fixed by clamps fabricated from 25mm x 3mm MS flat.
The box consisting of 2 Nos of MCB and 1 No of 60 AMPS ‘L’ way
consider doubl arm and box shall be painted with one coat of Red Oxide
and two coats aluminium paint including transportation etc., complete for
finished item of work.

1 x 4 4 Nos 5751.83 1 No
E. Cost of Central Lighting Rs.
Say
Total of A+B+C+D+ E
Say

447524687.xlsx - 1. CC Road- HB Colony


Page 25 of 2191

ADA MUNICIPALITY

Divider and central lighting

#REF!

Amount

437864.00

#REF!

#REF!

447524687.xlsx - 1. CC Road- HB Colony


Page 26 of 2191

Amount

1959796.00

447524687.xlsx - 1. CC Road- HB Colony


Page 27 of 2191

Amount

6262354.00

24951458.00

447524687.xlsx - 1. CC Road- HB Colony


Page 28 of 2191

Amount

73451.00
#REF!
#REF!

447524687.xlsx - 1. CC Road- HB Colony


Page 29 of 2191

Amount

76212.00

681399.00

5223045.00

634176.00

447524687.xlsx - 1. CC Road- HB Colony


Page 30 of 2191

Amount

332930.00

19401.00

199518.00

0.00
7166681.00
71.67 Lakhs

75931.00

447524687.xlsx - 1. CC Road- HB Colony


Page 31 of 2191

Amount

2060928.00

13500.00

1689455.00

3636500.00

161096.00

447524687.xlsx - 1. CC Road- HB Colony


Page 32 of 2191

Amount

1526.00

114218.00
7753154.00
77.53 Lakhs

447524687.xlsx - 1. CC Road- HB Colony


Page 33 of 2191

Amount

914971.00

1976902.00

1490369.00

447524687.xlsx - 1. CC Road- HB Colony


Page 34 of 2191

Amount

5125013.00

118509.00

969822.00

447524687.xlsx - 1. CC Road- HB Colony


Page 35 of 2191

Amount

38964.00

179657.00
10814207.00
108.14 Lakhs

#REF!

#REF!

447524687.xlsx - 1. CC Road- HB Colony


Page 36 of 2191

Amount

#REF!

#REF!

#REF!

#REF!

447524687.xlsx - 1. CC Road- HB Colony


Page 37 of 2191

Amount

96000.00

#REF!

#REF!

#REF!

447524687.xlsx - 1. CC Road- HB Colony


Page 38 of 2191

Amount
#REF!

447524687.xlsx - 1. CC Road- HB Colony


Page 39 of 2191

Amount

#REF!

11718.99

564950.46

29460.00

26775.00

#REF!

#REF!

447524687.xlsx - 1. CC Road- HB Colony


Page 40 of 2191

Amount

23007.32
#REF!
#REF!
#REF!
#REF!

447524687.xlsx - 1. CC Road- HB Colony


KODADA MUNICIPALITY

Construction of Divider and central lighting

Improvement of Two Lane Road at NH-16 to Housing Board Colony park with Central
Lighting, Median and Side drains

S.No Description of work Quantity

1 Formation of 5.50m wide BT Roads on both sides of 1098.00 Rmt


the Median.

2 Construction of 2 m wide Median in CR Stone 1098.00 Rmt


3 Construction of CC Drains along the Road 2196.00 Rmt
4 Providing Central lighting in the Median 31 Nos
Sub- Total - A
5 Provision towards NAC @ 0.5%
6 Works contract GST 12%
7 Consultancy charges for preparation of Detailed
project report including Estimations and Designs,
Construction supervision and monitoring & TPQC
etc, @ 4%
8 Provision for Seignorage charges
9 Provision for contingencies for Unforeseen items of
works etc,.
Sub - Total - B
Total cost of the Project Rs.
Say
ghting

d Colony park with Central


s

Amount in Lakhs

#REF!

47.32
66.37
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!

#REF!

#REF!
#REF!
KODADA MUNICIPALITY

Construction of Divider and central lighting

Improvement of Four Lane Road from Ambedkar Circle Junction to Gol Bunglow via
Municipal Office with Central Lighting

S.No Description of work Quantity

1 Widening and laying BT road of 2.75m wide on both 1500.00 Rmt


sides of the existing 5.40m wide CC road

2 Construction of Road Dividers 1500.00 Rmt


3 Providing Central lighting in the Median #REF! Nos
Sub- Total - A
4 Provision towards NAC @ 0.5%
5 Works contract GST 12%
6 Consultancy charges for preparation of Detailed
project report including Estimations and Designs,
Construction supervision and monitoring & TPQC
etc, @ 4%
7 Provision for Seignorage charges
8 Provision for contingencies for Unforeseen items of
works etc,.
9 Provision for Cutting the BT/ CC Road portion for
fixing of Dividers and erection of Poles etc, and
redoing etc,. Complete.

Sub - Total - B
Total cost of the Project Rs.
Say
ghting

unction to Gol Bunglow via


ing

Amount in Lakhs

#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!

6.27

#REF!

#REF!
#REF!
Page 45 of 2191

KODADA MUNICIPALITY

Construction of Divider and central lighting

Improvement of Four Lane Road from Ambedkar Circle Junction to Gol Bunglow via Municipal Office with Central Lighting
S No Measurements
Description Nos Qty Rate Per
LB D
A BT Road on both sides of the existing CC road
* Total Earth work excavation quantity including Rock for sectioning
and levelling the ground along the alignment.
Ch-500m to 2000m 1 x 2 1500.00 2.95 0.475 4203.75 Cum
1 Earthwork excavation in soils upto SDR by mechanical means
including trimming bottom and side slopes in accordance with
requirements of lines , grades and cross sections etc., complete for
finished item of work for trench cutting as per MoRT&H specification data-
301(5th Revision) and as directed by the Engineer-in-Charge MoRTH--Sn.3

EWE in ordinary soils for levelling the land along the alignment - 90% 3783 Cum 56.00 1 Cum
2 Excavation for roadway in ordinary rock with hydraulic excavator of
0.9 cum bucket capacity including cutting and loading in tippers,
transporting to embankment site with all lifts and lead beyond 100 m
& upto 1000 m, trimming bottom and side slopes in accordance with
requirements of lines, grades and cross-sections as per Technical
Specification Clause 302.3.5 MORD / 301 MORTH
EWE in rocky soils- ordinary rock by Hydraulic excavator 8% 336 Cum #REF! 1 Cum
3 Excavation for roadway in hard rock (blasting prohibited) with rock
breakers including breaking rock, loading in tippers and disposal with
initial lift of 3 mts and lead upto 1000 metres, trimming bottom and
side slopes in accordance with requirements of lines, grades and
cross- sections as per Technical Specification Clause 302.3.5
MORD / 301 MORTH

EWE in in hard rock requiring blasting by mechanical means 2% 84 Cum #REF! 1 Cum

447524687.xlsx - 1.Widening to 2 lane-Ambedkar


Page 46 of 2191

S No Measurements
Description Nos Qty Rate Per
LB D
4 Granular sub-base/base/surface course with local materials (Table
400.13) by mix in place method normal Construction of granular sub-
base by providing local material spreading in uniform layers with
motor grader on prepared surface, mixing by mix in place method
with rotavator at once and compacting with smooth wheel roller to
achieve the desired density complete as per Clause 401.4 as per data- road-
Technical Specification Clause 408 MORD. Sn.76

for formation of new BT Road on both sides of median 1 x 2 1500.00 2.95 0.20 1770
1770 Cum 902.30 1 Cum
5 Providing, Laying, Spreading and compacting graded HBG crushed
stone aggregate to Wet Mix macadem specification including cost,
seignorage of all materials and including premixing the material with
water at OMC in Mechanical mix plant carriage of mixed material by
tipper to site , laying in uniform layers with paver in base courses on
well prepared surface and compacting with Vibratory roller to acheive
the desired density etc., as directed by the Engineer-in-Charge and
as per MoRT&H specification.406 (5th revision) for finished item of data- road-
work. (Payment based on levels for finished item of work) Sn.8

WMM for Road portion


for formation of Shoulders 1 x 2 1500.00 2.95 0.25 2212.50
2212.50 Cum 1999.27 1 Cum
6 Providing and applying prime coat with bitumen emulsion (SS-1) Bulk
using emulsion pressure distributor on prepared surface of granular
base including cleaning of road surface and spraying primer at the
rate of 0.70 kg/sqm using using emulsion pressure distributor as per data- road-
MoRTH Specification 502 ( 5th Revision) and as directed by the Sn.9
Engineer- in - charge.
over WMM Surface
for formation of Shoulders 1 x 2 1500.00 2.95 8850.00
8850.00 Sqm 33.38 1 Sqm

447524687.xlsx - 1.Widening to 2 lane-Ambedkar


Page 47 of 2191

S No Measurements
Description Nos Qty Rate Per
LB D
7 Providing and laying of Dense Graded Bituminous Macadam with
100 - 120 TPH batch type hot mix plant producing an average output
of 75 tones per hour using hard blasted granite crushed aggregates
of Grading - II as per table 500-10 of MoRT&H Specification 505
(5th revision) premixed with bituminous binder of VG 30 grade @
4.50% of weight of total mixture, transported to site, laid over a
previously prepared surface with a hydrostatic paver finisher with
sensor control to the required grade, level and alignment and rolled
as per Clauses 501.6 and 501.7 to achieve the desired compaction
for finished item of work as directed by the Engineer-in-Charge
including hire and operational charges all T&P and all other
contingent charges necessary including cost of (excluding
seigniorage) charges of all materials etc., complete in all respects as
directed by Engineer-in-Charge and as per MoRT&H specification
No. 505 (5th Revision) data- road-
Sn.14

over existing and proposed roads on left side of the meridian 1 x 2 1500.00 2.85 0.050 427.50
427.50 Cum 7736.39 1 Cum

447524687.xlsx - 1.Widening to 2 lane-Ambedkar


Page 48 of 2191

S No Measurements
Description Nos Qty Rate Per
LB D
8 Providing and applying tack coat with bitumen emulsion (RS-1) Bulk
using emulsion pressure distributor at the rate of 0.20 kg per sqm on
the prepared bituminous/granular surface cleaned with mechanical data- road-
Sn.10
broom as per MoRTH. specification No 503 (5th Rivision)
over existing and proposed roads on left side of the meridian 1 x 2 1500.00 2.75 8250.00
8250.00 Sqm 8.71 1 Sqm
9 Providing 25 mm thick compacted Semi-Dense Bituminous Concrete
by hot mix plant using hard blasted granite crushed aggregates of
Grading -2 as per table 500-15 of specification 508 of MoRT&H (4th
Revision), premixed with bituminous binder 60/70 grade @ 5% of mix
and filler, transporting the hot mix to work site, laying with mechanical
paver finisher to the required grade, level and alignment, rolling with
smooth wheeled,vibratory and tandem rollers to achieve the desired
compaction as per MoRT&H Specification 508 (4th Revision)
complete for finished item of work in all respects as directed by
data- road-
Engineer-in-charge.
Sn.15

over existing and proposed roads on left side of the meridian 1 x 1 1500.00 11.00 0.025 412.50
412.50 Cum 7804.55 1 Cum
10 RBR-TSRA-12 : Road Marking with Hot Applied Thermoplastic
Compound with Reflectorising Glass Beads on Bituminous Surface :
Providing and laying of hot applied thermoplastic compound 2.5 mm
thick including reflectorising glass beads @ 250 gms per sqm area,
thickness of 2.5 mm is exclusive of surface applied glass beads as
per IRC:35 .The finished surface to be level, uniform and free from data- road-
streaks and holes as per Specification 803 MORTH Sn.77

Edge Lines 1 x 2 1500.00 0.10 300.00


Centre Line 1 x 2 1500.00 0.10 300.00
Zebra lines for Crossing 6 x 6 11.00 0.10 39.60
639.60 Sqm 667.91 1 Sqm
11 RBR-TSRA-28 : Road Markers/Road Stud with Lens Reflector :
Providing and fixing of road stud 100 x 100 mm die cast in aluminum,
resistant to corrosive effect of salt and grit, fitted with lense reflectors,
installed in concrete or asphaltic surface by drilling holes 30 mm upto
a depth of 600 mm and bedded in a suitable bituminous grout or data- road-
epoxy mortar, all as per BS:873 (Part 4) 1973. Sn.78

Edge Lines ( 2 sides Edge lines-2 x 2 = 4 Nos) 4 x 500 2000

447524687.xlsx - 1.Widening to 2 lane-Ambedkar


Page 49 of 2191

S No Measurements
Description Nos Qty Rate Per
LB D
Zebra lines for Crossing 6 x 12 72
2072 Nos 416.98 1 Nos
12 Forming earthen shoulders with selective soils obtained from side
earth having MDD of not less than 1.75 gms/cc by mechnical means
with all leads and lifts including pre-watering of soil at borrow area,
removal of top soil, excavation of soils at borrowed area, conveyance
of soil, depositing the soils on the embankment, spreading soils,
breaking clods, sectioning and consolidation with vibratory road roller
@ OMC to meet requirement of table 300-2 of MORT&H including all
hire and operational charges of T&P , complete for finished item of
work as per MORT&H specification 305 (5th revision) (Payment will
be made based on levels for finished item of work)
data- road-
Sn.54

for formation of Shoulders 1 x 2 1500.00 1.00 0.10 300.00


300.00 Cum 136.02 1 Cum
Cost of BT Road
Say Rs.

447524687.xlsx - 1.Widening to 2 lane-Ambedkar


Page 50 of 2191

ng

Amount

211848.00

#REF!

#REF!

447524687.xlsx - 1.Widening to 2 lane-Ambedkar


Page 51 of 2191

Amount

1597071.00

4423385.00

295413.00

447524687.xlsx - 1.Widening to 2 lane-Ambedkar


Page 52 of 2191

Amount

3307307.00

447524687.xlsx - 1.Widening to 2 lane-Ambedkar


Page 53 of 2191

Amount

71858.00

3219377.00

427195.00

447524687.xlsx - 1.Widening to 2 lane-Ambedkar


Page 54 of 2191

Amount

863983.00

40806.00
#REF!
#REF!

447524687.xlsx - 1.Widening to 2 lane-Ambedkar


Page 55 of 2191

KODADA MUNICIPALITY
Construction of Divider and central lighting

Improvement of Four Lane Road from Ambedkar Circle Junction to Gol Bunglow via Municipal Office with Central Lighting

S No Measurements
Description Nos Qty Rate Per
LB D
A Construction of CC Road Divider
1 BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual
Means- for structures in all types of soil as per drawing and technical
specifications and depositing on bank for all lifts and with an initial
lead of 10m including all operational, incidental, labour charges such
as shoring ,sheeting, planking, strutting, etc. complete for finished
item of work including seigniorage excluding dewatering charges etc data- Sewer-
as per SS - 20 B (APSS 308). Sn.15

for Laying Road devider 1 x #REF! 0.90 0.35 0.15 #REF!


#REF! Cum 210.92 1 Cum
2 Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size
HBG crushed stone aggregate and fine aggregate conforming to
table 1000-2 of MoRT&H including cost, conveyance of all materials
to site and labour charges, centering, machine mixing, laying,
Vibrating, curing etc., including all other incidental and operational
charges of all T&P etc., complete for finished item of work as per
MoRT&H specification 1500,1700, 2100 (5th Revision) and as
directed by the Engineer-in-Charge for base coarse below CC data- road-
Pavement. Sn.17

for Laying Road devider 1 x #REF! 0.90 0.35 0.10 #REF! Cum 3680.73 1 Cum
3 Vibrated cement concrete M 15 Grade Concrete using 40mm ,
20mm and 10mm size HBG crushed stone aggregate (Coarse
aggregate conforming to table 1000-1 and fine aggregate conforming
to table 1000-2) including cost and conveyance of all materials to
site and all labour charges , centering, machine mixing, laying in
position,Compacting, Vibrating and curing including all other
incidental and all other operational charges of T&P required etc.,
complete as per MoRT&H Specification 1500,1700, 2200 (5th
data- road-
Revision) for Dividers . Sn.48

447524687.xlsx - 2. CC Divider-Ambedkar
Page 56 of 2191

S No Measurements
Description Nos Qty Rate Per
LB D
Road Divider of 0.90m length & 0.30m wide ( up to 0.3m height) 1 x #REF! 0.90 0.300 0.30 #REF!
Road Divider of 0.90m length & 0.30m wide ( 0.3m to 0.5m height) 1 x #REF! 0.90 0.250 0.15 #REF!
#REF! Cum 3924.09 1 Cum
4 Plastering in CM (1:5) 12 mm thick including cost and conveyance of
all materials, labour charges , curing etc complete for finished item of data- road-
work as directed by the Engineer -in-Charge Sn.50

Both sides of the Divider ( Length wise) up to 0.3m height 2 x #REF! 0.90 0.30 #REF!
Sloped portion including Top 1 x #REF! 0.90 0.55 #REF!
#REF! Sqm 76.97 1 Sqm
5 Painting two coats with synthetic enamel paint in all shades on new data- road-
plastered concrete surfaces as directed by the Engineer-in- charge. Sn.51

as per Plastering Area #REF! Sqm 71.03 1 Sqm


A. Cost of Median
Say Rs.

447524687.xlsx - 2. CC Divider-Ambedkar
Page 57 of 2191

Amount

#REF!

#REF!

447524687.xlsx - 2. CC Divider-Ambedkar
Page 58 of 2191

Amount

#REF!

#REF!

#REF!
#REF!
#REF!

447524687.xlsx - 2. CC Divider-Ambedkar
KODADA MUNICIPALITY

Construction of Divider and central lighting

Improvement of Four Lane Road from Ambedkar Circle Junction to Gol Bunglow via
Municipal Office with Central Lighting, Median and Side drains

S.No Description of work Quantity

1 Formation of 7.50m wide BT Roads on both sides of 1156.00 Rmt


the Median.

2 Construction of 2 m wide Median in CR Stone 1156.00 Rmt


3 Construction of CC Drains along the Road 2312.00 Rmt
4 Providing Central lighting in the Median 33 Nos
Sub- Total - A
5 Provision towards NAC @ 0.5%
6 Works contract GST 12%
7 Consultancy charges for preparation of Detailed
project report including Estimations and Designs,
Construction supervision and monitoring & TPQC
etc, @ 4%
8 Provision for Seignorage charges
9 Provision for contingencies for Unforeseen items of
works etc,.
Sub - Total - B
Total cost of the Project Rs.
Say
ghting

unction to Gol Bunglow via


and Side drains

Amount in Lakhs

#REF!

52.16
69.63
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!

#REF!

#REF!
#REF!
Page 61 of 2191

KODADA MUNICIPALITY

Construction of Divider and central lighting

Improvement of Four Lane Road from Ambedkar Circle Junction to Gol Bunglow via Municipal Office with Central Lighting, Median and Side drains
S No Measurements
Description Nos Qty Rate Per
LB D
A Formation of BT Road
* Total Earth work excavation quantity including Rock for sectioning
and levelling the ground along the alignment. as per LS
1 x 1 1156.00 30.50 0.200 7051.60 Cum
1 Earthwork excavation in soils upto SDR by mechanical means
including trimming bottom and side slopes in accordance with
requirements of lines , grades and cross sections etc., complete for
finished item of work for trench cutting as per MoRT&H specification data-
301(5th Revision) and as directed by the Engineer-in-Charge MoRTH--Sn.3

EWE in ordinary soils for levelling the land along the alignment - 80% 5641 Cum 56.00 1 Cum
2 Excavation for roadway in ordinary rock with hydraulic excavator of
0.9 cum bucket capacity including cutting and loading in tippers,
transporting to embankment site with all lifts and lead beyond 100 m
& upto 1000 m, trimming bottom and side slopes in accordance with
requirements of lines, grades and cross-sections as per Technical
Specification Clause 302.3.5 MORD / 301 MORTH
EWE in rocky soils- ordinary rock by Hydraulic excavator 15% 1058 Cum #REF! 1 Cum
3 Excavation for roadway in hard rock (blasting prohibited) with rock
breakers including breaking rock, loading in tippers and disposal with
initial lift of 3 mts and lead upto 1000 metres, trimming bottom and
side slopes in accordance with requirements of lines, grades and
cross- sections as per Technical Specification Clause 302.3.5
MORD / 301 MORTH

EWE in in hard rock requiring blasting by mechanical means 5% 353 Cum #REF! 1 Cum

447524687.xlsx - 2. BT Road-Ambedkar junction


Page 62 of 2191

S No Measurements
Description Nos Qty Rate Per
LB D
4
Forming embankment with Side earth by mechanical means upto
SDR including pre-watering of soil , removal of top soil, excavation of
soils , depositing the soils on the embankment, spreading soil,
breaking clods, sectioning , grading and consolidation with 8 to 10
Tonnes Vibratory Road Roller @ OMC to meet requirement of table
300-2 of MoRT&H, including all hire and operational charges of
T&P, complete for finished item of work as per MoRT&H
specification 305 (5th revision) (Payment will be made based on
level for finished item of work).
Total Filling Quantity 1 x 1 1156.00 30.50 0.100 3525.80 Cum 146.00 1 Cum
5 Granular sub-base/base/surface course with local materials (Table
400.13) by mix in place method normal Construction of granular sub-
base by providing local material spreading in uniform layers with
motor grader on prepared surface, mixing by mix in place method
with rotavator at once and compacting with smooth wheel roller to
achieve the desired density complete as per Clause 401.4 as per data- road-
Technical Specification Clause 408 MORD. Sn.76

for formation of new BT Road on both sides of median 1 x 2 1156.00 7.70 0.20 3560
3560 Cum 902.30 1 Cum
6 Providing, Laying, Spreading and compacting graded HBG crushed
stone aggregate to Wet Mix macadem specification including cost,
seignorage of all materials and including premixing the material with
water at OMC in Mechanical mix plant carriage of mixed material by
tipper to site , laying in uniform layers with paver in base courses on
well prepared surface and compacting with Vibratory roller to acheive
the desired density etc., as directed by the Engineer-in-Charge and
as per MoRT&H specification.406 (5th revision) for finished item of data- road-
work. (Payment based on levels for finished item of work) Sn.8

WMM for Road portion


for formation of Shoulders 1 x 2 1156.00 7.70 0.25 4450.60
4450.60 Cum 1999.27 1 Cum
7 Providing and applying prime coat with bitumen emulsion (SS-1) Bulk
using emulsion pressure distributor on prepared surface of granular
base including cleaning of road surface and spraying primer at the
rate of 0.70 kg/sqm using using emulsion pressure distributor as per data- road-
MoRTH Specification 502 ( 5th Revision) and as directed by the Sn.9
Engineer- in - charge.
over WMM Surface
447524687.xlsx - 2. BT Road-Ambedkar junction
Page 63 of 2191

S No Measurements
Description Nos Qty Rate Per
LB D
for formation of Shoulders 1 x 2 1156.00 7.70 17802.40
17802.40 Sqm 33.38 1 Sqm
8 Providing and laying of Dense Graded Bituminous Macadam with
100 - 120 TPH batch type hot mix plant producing an average output
of 75 tones per hour using hard blasted granite crushed aggregates
of Grading - II as per table 500-10 of MoRT&H Specification 505
(5th revision) premixed with bituminous binder of VG 30 grade @
4.50% of weight of total mixture, transported to site, laid over a
previously prepared surface with a hydrostatic paver finisher with
sensor control to the required grade, level and alignment and rolled
as per Clauses 501.6 and 501.7 to achieve the desired compaction
for finished item of work as directed by the Engineer-in-Charge
including hire and operational charges all T&P and all other
contingent charges necessary including cost of (excluding
seigniorage) charges of all materials etc., complete in all respects as
directed by Engineer-in-Charge and as per MoRT&H specification
No. 505 (5th Revision) data- road-
Sn.14

over existing and proposed roads on left side of the meridian 1 x 2 1156.00 7.60 0.075 1317.84
1317.84 Cum 7736.39 1 Cum
9 Providing and applying tack coat with bitumen emulsion (RS-1) Bulk
using emulsion pressure distributor at the rate of 0.20 kg per sqm on
the prepared bituminous/granular surface cleaned with mechanical data- road-
Sn.10
broom as per MoRTH. specification No 503 (5th Rivision)
over existing and proposed roads on left side of the meridian 1 x 2 1156.00 7.50 17340.00
17340.00 Sqm 8.71 1 Sqm
10 Providing 25 mm thick compacted Semi-Dense Bituminous Concrete
by hot mix plant using hard blasted granite crushed aggregates of
Grading -2 as per table 500-15 of specification 508 of MoRT&H (4th
Revision), premixed with bituminous binder 60/70 grade @ 5% of mix
and filler, transporting the hot mix to work site, laying with mechanical
paver finisher to the required grade, level and alignment, rolling with
smooth wheeled,vibratory and tandem rollers to achieve the desired
compaction as per MoRT&H Specification 508 (4th Revision)
complete for finished item of work in all respects as directed by
data- road-
Engineer-in-charge.
Sn.15

over existing and proposed roads on left side of the meridian 1 x 2 1156.00 7.50 0.025 433.50
433.50 Cum 7804.55 1 Cum
447524687.xlsx - 2. BT Road-Ambedkar junction
Page 64 of 2191

S No Measurements
Description Nos Qty Rate Per
LB D
11 RBR-TSRA-12 : Road Marking with Hot Applied Thermoplastic
Compound with Reflectorising Glass Beads on Bituminous Surface :
Providing and laying of hot applied thermoplastic compound 2.5 mm
thick including reflectorising glass beads @ 250 gms per sqm area,
thickness of 2.5 mm is exclusive of surface applied glass beads as
per IRC:35 .The finished surface to be level, uniform and free from data- road-
streaks and holes as per Specification 803 MORTH Sn.77

Edge Lines 1 x 2 1156.00 0.10 231.20


Centre Line 1 x 2 1156.00 0.10 231.20
Divider side line 1 x 2 1156.00 0.10 231.20
Zebra lines for Crossing 6 x 6 7.50 0.10 27.00
720.60 Sqm 667.91 1 Sqm
12 RBR-TSRA-28 : Road Markers/Road Stud with Lens Reflector :
Providing and fixing of road stud 100 x 100 mm die cast in aluminum,
resistant to corrosive effect of salt and grit, fitted with lense reflectors,
installed in concrete or asphaltic surface by drilling holes 30 mm upto
a depth of 600 mm and bedded in a suitable bituminous grout or data- road-
epoxy mortar, all as per BS:873 (Part 4) 1973. Sn.78

Edge Lines ( 2 sides Edge lines-2 x 2 = 4 Nos) 4 x 1156 4624


Centre Line ( on both sides of median) 2 x 1156 2312
Zebra lines for Crossing 6 x 12 72
7008 Nos 416.98 1 Nos
13 Forming earthen shoulders with selective soils obtained from side
earth having MDD of not less than 1.75 gms/cc by mechnical means
with all leads and lifts including pre-watering of soil at borrow area,
removal of top soil, excavation of soils at borrowed area, conveyance
of soil, depositing the soils on the embankment, spreading soils,
breaking clods, sectioning and consolidation with vibratory road roller
@ OMC to meet requirement of table 300-2 of MORT&H including all
hire and operational charges of T&P , complete for finished item of
work as per MORT&H specification 305 (5th revision) (Payment will
be made based on levels for finished item of work)
data- road-
Sn.54

for formation of Shoulders 1 x 2 1156.00 1.00 0.10 231.20


231.20 Cum 136.02 1 Cum
Cost of BT Road

447524687.xlsx - 2. BT Road-Ambedkar junction


Page 65 of 2191

S No Measurements
Description Nos Qty Rate Per
LB D
Say Rs.

447524687.xlsx - 2. BT Road-Ambedkar junction


Page 66 of 2191

S No Measurements
Description Nos Qty Rate Per
LB D
B Construction of Median with CRS Walls 3.00 m wide
14 BLD-CSTN-2-2(10):Earth work excavation in Ordinary soils by
Mechcanical Means-Upto 3 m depth for foundations and depositing
on bank for all lifts and with an initial lead of 10m including all
operational, incidental, labour charges such as shoring ,sheeting,
planking, strutting, etc. complete for finished item of work including
seigniorage excluding dewatering charges etc as per SS - 20 B
for construction
(APSS 308). of CRS walls on both sides of the Median 1 x 2 1156.00 0.50 0.40 462.40
462.40 Cum 105.85 1 Cum
15 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth
Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine
aggregate: coarse aggregate ) using 40mm size Hard Granite
Machine Crushed Metal including cost and conveyance of all
materials like cement, sand, coarse aggregate water etc., to site ,
seigniorage charges on all materials, labour charges , for mixing ,
laying, concrete , ramming in 15 cm layers, finishing top surface to
the required level curing etc., complete for finished item of work.for
foundation and under flooring bed.
below CC walls on both sidesof the Median 1 x 2 1156.00 0.50 0.10 115.60 Cum 3785.55 1 Cum
16 BLD-CSTN-6-5-(60) : Construction of CRS Masonary 1st Sort in
Cement Mortor ( 1:6 ) Prop using hard granite stone including cost &
Conveyance of all materials like Cement, Sand , Water, Granite
Stones, including Seigniorage Charges on all Materials, ,labour
charges for cutting Stones to required size and shape, mixing of
Cement Mortor, Construction, Scaffolding Charges curing etc.,
complete for finished item of Work .

CRS walls on both sides of the Median 0.36m below GL and 0.75m
1 x 2 1156.00 0.300 1.11 769.90 Cum 4605.86 1 Cum
above GL
17 BLD-CSTN-7-3-(74) : Providing raised or Cut Cement Pointing on
coursed or Ashlar stone masonry or concrete block walling in white
cement mortar 1 : 3 (1 white cement : 3 marble dust).including cost &
conveyance of all materials to site , seignaiorage charges on all
materials, labour charges on all materials, curing etc., Complete for
finished item of work

on outer sides of the CRS walls above GL ( 0.75 sides) 1 x 2 1156.00 0.75 1734.00 Sqm 234.88 1 Sqm

447524687.xlsx - 2. BT Road-Ambedkar junction


Page 67 of 2191

S No Measurements
Description Nos Qty Rate Per
LB D
18 BLD-CSTN-3-21 - (33) - Damp proof course 50mm thick with cement data- road-
concrete (1:2:4 Nominal mix), using 12mm hard broken stone Sn.51
aggregate including cost of all materials, seigniorage charges,
excluding conveyance charges of materials, including the cost of
machinery, labour charges, mixing, placing in position, leveling,
vibrating, curing etc. complete for finished item of work. (Using
concrete mixer)

Coping over the CRS walls 1 x 2 1156.00 0.35 809.20 Sqm 264.23 1 Sqm
19 BLD-CSTN-2-9 (17) : Filling with useful available excavated earth
(excluding rock) in trenches, sides of foundations and basement with
initial lead in layers not exceeding 15 cm thick, consolidating each
deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental,
labour charges, hire charges of T & P etc., complete for finished item data- road-
of work. (APSS NO. 309 & 310) Sn.74

for filling in side the median with available excavated earth. 1 x 1 1156.00 2.40 0.60 1664.64 Cum 29.94 1 Cum
20 Imporatation of good quality red earth congenial for plants grouth of
light textured, crystalline, porous and friable, generally acidic or
neutral but not alkaline, fertile, cost, transportation, loading,
unloading etc complete
for filling in side the median with red earth ( Top Layer) 1 x 1 1156.00 2.40 0.15 416.16 Cum 1231.59 1 Cum
21 RBR-HRTC-1: Spreading of sludge farm yard manure or/ and good
earth in required thickness (cost of sludge, farm yard manure or/and data- road-
Sn.75
good earth to be paid for separately) as per Specification 307
MORTH
Quantity as per collection 416.16 Cum 0.00 1 Cum
A. Cost of Median
Say Rs.
C Construction of CC Drain
22 BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual
Means- for structures in all types of soil as per drawing and technical
specifications and depositing on bank for all lifts and with an initial
lead of 10m including all operational, incidental, labour charges such
as shoring ,sheeting, planking, strutting, etc. complete for finished
item of work including seigniorage excluding dewatering charges etc
for CC SS
as per Drains
- 20on both sides
B (APSS of the road
308). 1 x 2 1156.00 1.10 1.05 2670.36
for RCC culverts 1 x 8 10.00 1.20 1.25 120.00
2790.36 Cum 210.92 1 Cum

447524687.xlsx - 2. BT Road-Ambedkar junction


Page 68 of 2191

S No Measurements
Description Nos Qty Rate Per
LB D
23 RBR-FNDN-4 : B-i : .Providing concrete for plain/reinforced concrete
in open foundations using 40 mm nominal size Graded hard stone
aggregate, mechanically mixed, placed in foundation and compacted
by vibration including curing for 14 days complete as per drawings
and technical specifications Clause 802, 803, 1202 & 1203 MORD
and 1500, 1700 & 2100 MORTH. : P.C.C grade M 15 (Design Mix)
MORTH 12.8 A using 40 mm Graded Metal

for CC Drains on both sides of the road 1 x 2 1156.00 1.10 0.10 254.32
for RCC culverts 1 x 8 10.00 1.20 0.15 14.40
268.72 Cum 4733.96 1 Cum
24 Vibrated cement concrete M 15 Grade Concrete using 40mm ,
20mm and 10mm size HBG crushed stone aggregate (Coarse
aggregate conforming to table 1000-1 and fine aggregate conforming
to table 1000-2) including cost and conveyance of all materials to
site and all labour charges for machine mixing,laying in position,
Compacting , Vibrating and curing including all other incidental and
all other operational charges of T&P required etc., complete as per
MoRT&H Specification 1500,1700, 2100 (5th Revision) for footings
and Raft foundation .

Vent portion of CC Drains 1 x 2 1156.00 1.00 0.10 231.20


Vent portion of Culvers 1 x 8 10.00 1.10 0.15 13.20
244.40 Cum 3924.09 1 Cum
25 Vibrated cement concrete M 15 Grade Concrete using 40mm ,
20mm and 10mm size HBG crushed stone aggregate (Coarse
aggregate conforming to table 1000-1 and fine aggregate conforming
to table 1000-2) including cost and conveyance of all materials to
site and all labour charges for machine mixing, laying in
position,Compacting, Vibrating and curing including all other
incidental and all other operational charges of T&P required etc.,
complete as per MoRT&H Specification 1500,1700, 2200 (5th
Revision) for Sub structure .

Drain walls 2 x 2 1156.00 0.275 0.600 762.96


Culvert Walls 2 x 8 10.00 0.325 0.600 31.20
794.16 Cum 4150.48 1 Cum

447524687.xlsx - 2. BT Road-Ambedkar junction


Page 69 of 2191

S No Measurements
Description Nos Qty Rate Per
LB D
26 Vibrated reinforced cement concrete M 20 grade using 20mm &
10mm HBG crushed stone aggregate (Coarse aggregate conforming
to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost, conveyance of all materials to site and labour
charges, centering, machine mixing, laying, vibrating, curing etc.,
including other incidental hire and operational charges of all T&P as
per approved drawings and as directed during execution but
excluding cost of steel and its fabrication charges for finished item as
per MoRT&H specification 1500,1600,1700 & 2200 (5th revision )
and as directed by the Engineer-in-Charge for Cover slabs over
side drains
RCC slabs over culverts 1 x 8 10.00 1.10 0.200 17.60 Cum 4488.99 1 Cum
27 Plastering in CM (1:5) 12 mm thick including cost and conveyance of
all materials , labour charges , curing etc complete for finished item
of work as directed by the Engineer -in-Charge
Drain inner walls 2 x 2 1156.00 1.600 7398.40
Drain bottom 2 x 1 1156.00 0.30 693.60
8092.00 Sqm 76.97 1 Sqm
28 BLD-CSTN-2-9 (17) : Filling with useful available excavated earth
(excluding rock) in trenches, sides of foundations and basement with
initial lead in layers not exceeding 15 cm thick, consolidating each
deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental,
labour charges, hire charges of T & P etc., complete for finished item data- road-
of work. (APSS NO. 309 & 310) Sn.74

Total EWE Qty 2790.36 Cum


Deduct CC Bed Qty -268.72
Deduct Drain vent Qty -244.40
Deduct Drain Qty -1 x 2 1156.00 1.00 0.60 -1387.20
Deduct Culvert Qty -1 x 8 10.00 1.10 0.60 -52.80
for filling in side the foot paths with available excavated earth. 837.24 Cum 29.94 1 Cum

447524687.xlsx - 2. BT Road-Ambedkar junction


Page 70 of 2191

S No Measurements
Description Nos Qty Rate Per
LB D
29 Providing HYSD bars ( Fe-415 ) of different diameters, wrought and
put up bars of all diameters including cost and conveyance of steel to
site and all labour charges for fabrication of reinforcement including
cutting, bending, binding rods, tying grills, placing them in position
etc., complete including cost and conveyance of binding wire and all
handling charges and operational charges etc., and including over
lapping welding if required etc., complete for all R.C.C items for
finished item of work as per standard drawings, as per the directions
of the Engineer-in-Charge and as per MoRT&H specification 1600 &
2200 (5th revision) and as per I.S.1786 of 1985 for Sub structure
of R.C.C items.

Steel for RCC culvert slabs @ 120Kgs for Cum of RCC 17.60 120.00 Kg/cum 2112.00 kg 56.71 1 kg
Cost of Drains
Say Rs.
D Providing Central Lighting
30 ELEC-7.2.3 : Fabrication, Transportation and supply of hot-dip
galvanized Octogonal Pole with BSEN -10025 grade S 355 JO steel
plate for shaft, IS 2062 for base plate with door opening
arrangement, including the supply of suitable boards with bakelite
sheet and MCB's as per IS specification suitable to withstand the
wind speed of 180 KMPH for 9mtrs height Pole having dimensions
Bottom 155mm, Top 70mm with 3mm thick, base plate 260 x260
x16mm and 4 Nos of M24 x 750 long 'J' bolts along with template
ofMakes: Bajaj / Valmont / TRANSRAIL 1 x 33 33 Nos #REF! 1 Nos
31 ELEC-7.3.3 : Fabrication, Transportation and supply of of
1.5mtrs sword type decorative double arm bracket with dooms
either sides complete with all accessories with MS galvanized
50mm dia Pipe.
1 x 33 33 Nos #REF! 1 Nos
32 ELEC-7.9.3 : Foundation and erection charges with special T&P, for
9.00Mtrs / 10Mtrs long Octagonal / Conical pole duly erecting on
base plate duly providing 4 Nos foundation bolts with nuts with
providing of 0.60Mtr x 0.60Mtrs x 1.40 Mtr size M20 cc work vibrated
concreting mixing with necessary steel (15kgs) reinforcement as
directed by the field engineers during execution including all labour
charges and cost and conveyance of materials etc. complete
1 x 33 33 Nos #REF! 1 Nos

447524687.xlsx - 2. BT Road-Ambedkar junction


Page 71 of 2191

S No Measurements
Description Nos Qty Rate Per
LB D
33 ELEC-4.1.10 : Supply of 10 Sqmm 4 Core XLPE insulated, 1100V
grade armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) of Makes : RPG / Finolex / Paragon / V-Guard /
Fortune Art / Suncab / Finecab / Gemscab / Payal.
4 Core 10 Sqmm 1 x 1 1155 1155 Rmt #REF! 1 Rmt
34 ELEC-4.1.12 : Supply of 16 Sqmm 4 Core XLPE insulated, 1100V
grade armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) ofMakes : RPG / Finolex / Paragon / V-Guard /
Fortune Art / Suncab / Finecab / Gemscab / Payal.
4 Core 16 Sqmm 1 x 1 83 83 Rmt #REF! 1 Rmt
35 ELEC-4.8.2 : Supply and Transportation of Outer dia 63mm and
Inner dia 51mm double walled corrugated HDPE duct made as per
specification BSEN - 500 86/IS 14930 Part-II. Makes:DURA LINE
(Dura Guard) or its equivalent make.
51mm dia DWC pipe 1 x 1 1155 1155 Rmt #REF! 1 Rmt

447524687.xlsx - 2. BT Road-Ambedkar junction


Page 72 of 2191

S No Measurements
Description Nos Qty Rate Per
LB D
36 Supply and erection of the feeder pillar box of MS sheet of 14 SWG
110 X 700 X 250 mm in size and painted with 2 coats of red oxide
and two coats of synthetic enamel paint of light gray shade (or power
coated). The FPB should be out door type, dust and vermin proof,
confirming to IP – 55 degree of protection as per IS – 2147. The
inner door of the box should be having an interlocking arrangement.
Single compression cable glands and crimping type lugs shall be
carried out with copper standard conductor, flexible PVC insulated
1100
a) OutVdoor
grade wire.
with The FPBhinges
concealed shouldandconsists the following.
neoprene sponge gasket.
b) Hinged inner door.
c) MS bracket for pad locking facility with Canopy.
d) 3 Nos siemen’s type door lock with key on outer door.
e) Dancer notice plate.
f) MS base channel 50 x 50 x 3 mm thick and 2 Nos thumb screws.
g)1 No Micro processed based electronic timer.
h) 3 Nos 63 A HRC fuses EE or equivalent make. LS
k) 4 Nos 60 A TPN MCB’s as out going MDS / Havell’s
l) 4 Nos 25 x 6mm thick alluminium bus bars for R.Y.B phases and
neutral mounted rigidly on suitable insulators.
m)1 No 110 A Contactor (ML – 6) L&T make.
n) 1 No kaycee make auto / mannual switch.
o) Removable undrilled MS painted cable gland plate.
p) MS base plate for mounting switch gear components.
q) 4 Nos foundation holes in base channel to suit M 12 foundation
bolts.
r) 4 Nos 4 way terminal blocks for outgoing cricuits open barrier type
balson / Everest / Essen or equivalent make (1 No. 100 A four way
terminal block for incoming open barriers type or balson / everest /
essen or equivalent make.
s) 2 Nos earthing studs (M10) with nut and spring washer etc,.

1 x 2 2 job 32000 1 job


37 ELEC-10.7.51 :Supply of 3 Core x 2.5 Sqmm FRLS armoured copper
cable as per IS. 7098 / Part-I / 1988 including all taxes etc., complete
of make Universal/ CCI /Unicab/Polycab / Finolex / KEI / Havells.

3 Core x 2.5 Sqmm FRLS armoured copper cabl 1 x 1 743 743 Rmt #REF! 1 Rmt
38 ELEC-4.4.1 : Supply and fixing of crimping type copper lugs
confirming to I.S specifications for cable upto 16 Sq.mm including
nuts and bolts with connections
Copper lugs 1 x 264 264 Nos #REF! 1 Nos
447524687.xlsx - 2. BT Road-Ambedkar junction
Page 73 of 2191

S No Measurements
Description Nos Qty Rate Per
LB D
39 ELEC-4.3.5 : Supply and Fixing of single compression brass cable
glands for 4 core XLPE armoured cable up to 16.0 Sq.mm with
brass washers complete.
Brass cable glands 1 x 4 4 Nos #REF! 1 Nos
40 ELEC-9.1.56 : Supply and laying of 40mm Nominal Bore medium
grade G.I.Pipe including cost and conveyance etc, complete.
40mm Nominal Bore medium grade G.I.Pipe 1 x 1 66 66 Rmt #REF! 1 Rmt
41 ELEC-3.5.1: Supply & Installtion of Automatic Street Light Control
System with Optical Sensor, Low volatage / High voltage trip and
reset, operating voltage 150 - 280V AC, 50 HZ with suitable SMC
enclousure of IP 54 protection, MCBs and contactor suitable to
control the load of 3 KW of single phase load with necessary
clamping arrangements. Makes : Swadeep Nature Switch / Light
Mate. 1 x 1 1 No #REF! 1 No
42 BLD-ELEC-5-1-1 : Providing independent earthing for sophisticated
equipment like computer medical Equipment, Electronic Gadgets
etc., with 600mm x 600mm x3.15 mm thick copper plate rigidly fixed
to the 40mm dia GI pipe of 2.5 Mtrs. Length and 19mm dia ‘B’ class
GI pipe of 0.3 M long connected with reducer providing GI funnel
covers with wire mesh of suitable size staggered holes of 16 Nos of
12mm dia to the earht electrode, enclosed in a CC chamber of
400mm x 400mm x 400mm covered with reinforced cement concrete
cover and all labour charges RCC slab cover duly filing salt and
charcoal in layers from the bottom of the earth pit, giving earth
connections from the electrodes to GI strip 25 x 6 x 200mm length 1 x 2 2 Nos 3906.33 1 Nos
provided with holes GI washers, boths and labour charges etc.,
43 BLD-ELEC-7-4-2 : Supply and erection of Integral street light
complete.
luminaire of 150W MH lamp fitting comprises of single piece die cast
Aluminium body with copper wound ballast and capacitor, Ignitor,
with pot optics including 150W MH lamp etc., complete.
150W MH lamps 2 x 33 66 Nos 5538.73 1 Nos
44 Laying of PVC armoured under ground cable in existing duct as
directed by the department including cost and conveyance of all
materials and labour charges etc., complete.
Armoured cable 1 x 1 1271 1271 Rmt 15.00 1 Rmt
45 Laying of 63mm and Inner dia 51 mm double walled corrugated
HDPE as directed by the department including cost and conveyance
of all materials and labour charges etc., complete.
Laying DWC pipe in Median 1 x 1 1155 1155 Rmt 15.00 1 Rmt

447524687.xlsx - 2. BT Road-Ambedkar junction


Page 74 of 2191

S No Measurements
Description Nos Qty Rate Per
LB D
46 Supply of 6-32A !OKA SP MCB, C/D Curve ISI Mark. Makes :
Legrand- DX3 / Schneider-Acti9 / Siemens / L&T / Exora. As per SSR
No: ELEC2.9.1,
Supply of 63A 4 SI.
Way No: 282
Connector 1 x 66 66 Nos #REF! 1 Nos
47 Supply and Run of No.8 SWG G.1 wire including cost of all
accessories and labour charges etc., complete .
1 x 297 297 Rmt #REF! 1 Rmt
48 Fabrication supply and errection of water tight M.S junction Box 260
x 300 x 140 mm (depth) size and 16 guage MS sheet with fixing
arrangements, with necessary holes for cable entry and exit from the
box. The box shall be provided with cover and hinges on one side
and bolting at other end. The box shall be fixed by clamps fabricated
from 25mm x 3mm MS flat. The box consisting of 2 Nos of MCB and
1 No of 60 AMPS ‘L’ way consider doubl arm and box shall be
painted with one coat of Red Oxide and two coats aluminium paint
including transportation etc., complete for finished item of work. 1 x 3 3 Nos 5751.83 1 No
Total Amount Rs.
Say
Total of A+B+C+D
Say

447524687.xlsx - 2. BT Road-Ambedkar junction


Page 75 of 2191

nd Side drains

Amount

315896.00

#REF!

#REF!

447524687.xlsx - 2. BT Road-Ambedkar junction


Page 76 of 2191

Amount

514767.00

3212621.00

8897951.00

447524687.xlsx - 2. BT Road-Ambedkar junction


Page 77 of 2191

Amount

594244.00

10195324.00

151031.00

3383272.00
447524687.xlsx - 2. BT Road-Ambedkar junction
Page 78 of 2191

Amount

481296.00

2922196.00

31448.00
#REF!

447524687.xlsx - 2. BT Road-Ambedkar junction


Page 79 of 2191

Amount
#REF!

447524687.xlsx - 2. BT Road-Ambedkar junction


Page 80 of 2191

Amount

48945.00

437610.00

3546052.00

407282.00

447524687.xlsx - 2. BT Road-Ambedkar junction


Page 81 of 2191

Amount

213815.00

49839.00

512538.00

0.00
5216081.00
52.16 Lakhs

588543.00

447524687.xlsx - 2. BT Road-Ambedkar junction


Page 82 of 2191

Amount

1272110.00

959048.00

3296145.00

447524687.xlsx - 2. BT Road-Ambedkar junction


Page 83 of 2191

Amount

79006.00

622841.00

25067.00

447524687.xlsx - 2. BT Road-Ambedkar junction


Page 84 of 2191

Amount

119772.00
6962532.00
69.63 Lakhs

#REF!

#REF!

#REF!

447524687.xlsx - 2. BT Road-Ambedkar junction


Page 85 of 2191

Amount

#REF!

#REF!

#REF!

447524687.xlsx - 2. BT Road-Ambedkar junction


Page 86 of 2191

Amount

64000.00

#REF!

#REF!
447524687.xlsx - 2. BT Road-Ambedkar junction
Page 87 of 2191

Amount

#REF!

#REF!

#REF!

7812.66

365556.18

19065.00

17325.00

447524687.xlsx - 2. BT Road-Ambedkar junction


Page 88 of 2191

Amount

#REF!

#REF!

17255.49
#REF!
#REF!
#REF!
#REF!

447524687.xlsx - 2. BT Road-Ambedkar junction


Page 89 of 2191

KODADA MUNICIPALITY

Construction of Divider and central lighting

Improvement of Two Lane Road at NH-16 to Housing Board Colony park with Central Lighting, Median and Side drains
S No Measurements
Description Nos Qty Rate Per
LB D
A Formation of BT Road
* Total Earth work excavation quantity including Rock for sectioning
and levelling the ground along the alignment. as per LS
1 x 1 1098.00 18.00 0.200 3952.80 Cum
1 Earthwork excavation in soils upto SDR by mechanical means
including trimming bottom and side slopes in accordance with
requirements of lines , grades and cross sections etc., complete for
finished item of work for trench cutting as per MoRT&H specification data-
301(5th Revision) and as directed by the Engineer-in-Charge MoRTH--Sn.3

EWE in ordinary soils for levelling the land along the alignment - 80% 3162 Cum 56.00 1 Cum
2 Excavation for roadway in ordinary rock with hydraulic excavator of
0.9 cum bucket capacity including cutting and loading in tippers,
transporting to embankment site with all lifts and lead beyond 100 m
& upto 1000 m, trimming bottom and side slopes in accordance with
requirements of lines, grades and cross-sections as per Technical
Specification Clause 302.3.5 MORD / 301 MORTH
EWE in rocky soils- ordinary rock by Hydraulic excavator 15% 593 Cum #REF! 1 Cum
3 Excavation for roadway in hard rock (blasting prohibited) with rock
breakers including breaking rock, loading in tippers and disposal with
initial lift of 3 mts and lead upto 1000 metres, trimming bottom and
side slopes in accordance with requirements of lines, grades and
cross- sections as per Technical Specification Clause 302.3.5
MORD / 301 MORTH

EWE in in hard rock requiring blasting by mechanical means 5% 198 Cum #REF! 1 Cum

447524687.xlsx - 3. BT Road-2 lane-HB Colony


Page 90 of 2191

S No Measurements
Description Nos Qty Rate Per
LB D
4
Forming embankment with Side earth by mechanical means upto
SDR including pre-watering of soil , removal of top soil, excavation of
soils , depositing the soils on the embankment, spreading soil,
breaking clods, sectioning , grading and consolidation with 8 to 10
Tonnes Vibratory Road Roller @ OMC to meet requirement of table
300-2 of MoRT&H, including all hire and operational charges of
T&P, complete for finished item of work as per MoRT&H
specification 305 (5th revision) (Payment will be made based on
level for finished item of work).
Total Filling Quantity 1 x 1 1098.00 18.00 0.100 1976.40 Cum 146.00 1 Cum
5 Granular sub-base/base/surface course with local materials (Table
400.13) by mix in place method normal Construction of granular sub-
base by providing local material spreading in uniform layers with
motor grader on prepared surface, mixing by mix in place method
with rotavator at once and compacting with smooth wheel roller to
achieve the desired density complete as per Clause 401.4 as per data- road-
Technical Specification Clause 408 MORD. Sn.76

for formation of new BT Road on both sides of median 1 x 2 1098.00 5.70 0.20 2503
2503 Cum 902.30 1 Cum
6 Providing, Laying, Spreading and compacting graded HBG crushed
stone aggregate to Wet Mix macadem specification including cost,
seignorage of all materials and including premixing the material with
water at OMC in Mechanical mix plant carriage of mixed material by
tipper to site , laying in uniform layers with paver in base courses on
well prepared surface and compacting with Vibratory roller to acheive
the desired density etc., as directed by the Engineer-in-Charge and
as per MoRT&H specification.406 (5th revision) for finished item of data- road-
work. (Payment based on levels for finished item of work) Sn.8

WMM for Road portion


for formation of Shoulders 1 x 2 1098.00 5.70 0.25 3129.30
3129.30 Cum 1999.27 1 Cum
7 Providing and applying prime coat with bitumen emulsion (SS-1) Bulk
using emulsion pressure distributor on prepared surface of granular
base including cleaning of road surface and spraying primer at the
rate of 0.70 kg/sqm using using emulsion pressure distributor as per data- road-
MoRTH Specification 502 ( 5th Revision) and as directed by the Sn.9
Engineer- in - charge.
over WMM Surface
447524687.xlsx - 3. BT Road-2 lane-HB Colony
Page 91 of 2191

S No Measurements
Description Nos Qty Rate Per
LB D
for formation of Shoulders 1 x 2 1098.00 5.70 12517.20
12517.20 Sqm 33.38 1 Sqm
8 Providing and laying of Dense Graded Bituminous Macadam with
100 - 120 TPH batch type hot mix plant producing an average output
of 75 tones per hour using hard blasted granite crushed aggregates
of Grading - II as per table 500-10 of MoRT&H Specification 505
(5th revision) premixed with bituminous binder of VG 30 grade @
4.50% of weight of total mixture, transported to site, laid over a
previously prepared surface with a hydrostatic paver finisher with
sensor control to the required grade, level and alignment and rolled
as per Clauses 501.6 and 501.7 to achieve the desired compaction
for finished item of work as directed by the Engineer-in-Charge
including hire and operational charges all T&P and all other
contingent charges necessary including cost of (excluding
seigniorage) charges of all materials etc., complete in all respects as
directed by Engineer-in-Charge and as per MoRT&H specification
No. 505 (5th Revision) data- road-
Sn.14

over existing and proposed roads on left side of the meridian 1 x 2 1098.00 5.60 0.075 922.32
922.32 Cum 7736.39 1 Cum
9 Providing and applying tack coat with bitumen emulsion (RS-1) Bulk
using emulsion pressure distributor at the rate of 0.20 kg per sqm on
the prepared bituminous/granular surface cleaned with mechanical data- road-
Sn.10
broom as per MoRTH. specification No 503 (5th Rivision)
over existing and proposed roads on left side of the meridian 1 x 2 1098.00 5.50 12078.00
12078.00 Sqm 8.71 1 Sqm
10 Providing 25 mm thick compacted Semi-Dense Bituminous Concrete
by hot mix plant using hard blasted granite crushed aggregates of
Grading -2 as per table 500-15 of specification 508 of MoRT&H (4th
Revision), premixed with bituminous binder 60/70 grade @ 5% of mix
and filler, transporting the hot mix to work site, laying with mechanical
paver finisher to the required grade, level and alignment, rolling with
smooth wheeled,vibratory and tandem rollers to achieve the desired
compaction as per MoRT&H Specification 508 (4th Revision)
complete for finished item of work in all respects as directed by
data- road-
Engineer-in-charge.
Sn.15

over existing and proposed roads on left side of the meridian 1 x 2 1098.00 5.50 0.025 301.95
301.95 Cum 7804.55 1 Cum
447524687.xlsx - 3. BT Road-2 lane-HB Colony
Page 92 of 2191

S No Measurements
Description Nos Qty Rate Per
LB D
11 RBR-TSRA-12 : Road Marking with Hot Applied Thermoplastic
Compound with Reflectorising Glass Beads on Bituminous Surface :
Providing and laying of hot applied thermoplastic compound 2.5 mm
thick including reflectorising glass beads @ 250 gms per sqm area,
thickness of 2.5 mm is exclusive of surface applied glass beads as
per IRC:35 .The finished surface to be level, uniform and free from data- road-
streaks and holes as per Specification 803 MORTH Sn.77

Edge Lines 1 x 2 1098.00 0.10 219.60


Centre Line 1 x 2 1098.00 0.10 219.60
Divider side line 1 x 2 1098.00 0.10 219.60
Zebra lines for Crossing 6 x 6 5.50 0.10 19.80
678.60 Sqm 667.91 1 Sqm
12 RBR-TSRA-28 : Road Markers/Road Stud with Lens Reflector :
Providing and fixing of road stud 100 x 100 mm die cast in aluminum,
resistant to corrosive effect of salt and grit, fitted with lense reflectors,
installed in concrete or asphaltic surface by drilling holes 30 mm upto
a depth of 600 mm and bedded in a suitable bituminous grout or data- road-
epoxy mortar, all as per BS:873 (Part 4) 1973. Sn.78

Edge Lines ( 2 sides Edge lines-2 x 2 = 4 Nos) 4 x 1098 4392


Centre Line ( on both sides of median) 2 x 1098 2196
Zebra lines for Crossing 6 x 12 72
6660 Nos 416.98 1 Nos
13 Forming earthen shoulders with selective soils obtained from side
earth having MDD of not less than 1.75 gms/cc by mechnical means
with all leads and lifts including pre-watering of soil at borrow area,
removal of top soil, excavation of soils at borrowed area, conveyance
of soil, depositing the soils on the embankment, spreading soils,
breaking clods, sectioning and consolidation with vibratory road roller
@ OMC to meet requirement of table 300-2 of MORT&H including all
hire and operational charges of T&P , complete for finished item of
work as per MORT&H specification 305 (5th revision) (Payment will
be made based on levels for finished item of work)
data- road-
Sn.54

for formation of Shoulders 1 x 2 1098.00 1.00 0.10 219.60


219.60 Cum 136.02 1 Cum
Cost of BT Road

447524687.xlsx - 3. BT Road-2 lane-HB Colony


Page 93 of 2191

S No Measurements
Description Nos Qty Rate Per
LB D
Say Rs.

447524687.xlsx - 3. BT Road-2 lane-HB Colony


Page 94 of 2191

S No Measurements
Description Nos Qty Rate Per
LB D
B Construction of Median with CRS Walls 2.00 m wide
14 BLD-CSTN-2-2(10):Earth work excavation in Ordinary soils by
Mechcanical Means-Upto 3 m depth for foundations and depositing
on bank for all lifts and with an initial lead of 10m including all
operational, incidental, labour charges such as shoring ,sheeting,
planking, strutting, etc. complete for finished item of work including
seigniorage excluding dewatering charges etc as per SS - 20 B
for construction
(APSS 308). of CRS walls on both sides of the Median 1 x 2 1098.00 0.50 0.40 439.20
439.20 Cum 105.85 1 Cum
15 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth
Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine
aggregate: coarse aggregate ) using 40mm size Hard Granite
Machine Crushed Metal including cost and conveyance of all
materials like cement, sand, coarse aggregate water etc., to site ,
seigniorage charges on all materials, labour charges , for mixing ,
laying, concrete , ramming in 15 cm layers, finishing top surface to
the required level curing etc., complete for finished item of work.for
foundation and under flooring bed.
below CC walls on both sidesof the Median 1 x 2 1098.00 0.50 0.10 109.80 Cum 3785.55 1 Cum
16 BLD-CSTN-6-5-(60) : Construction of CRS Masonary 1st Sort in
Cement Mortor ( 1:6 ) Prop using hard granite stone including cost &
Conveyance of all materials like Cement, Sand , Water, Granite
Stones, including Seigniorage Charges on all Materials, ,labour
charges for cutting Stones to required size and shape, mixing of
Cement Mortor, Construction, Scaffolding Charges curing etc.,
complete for finished item of Work .

CRS walls on both sides of the Median 0.36m below GL and 0.75m
1 x 2 1098.00 0.300 1.11 731.27 Cum 4605.86 1 Cum
above GL
17 BLD-CSTN-7-3-(74) : Providing raised or Cut Cement Pointing on
coursed or Ashlar stone masonry or concrete block walling in white
cement mortar 1 : 3 (1 white cement : 3 marble dust).including cost &
conveyance of all materials to site , seignaiorage charges on all
materials, labour charges on all materials, curing etc., Complete for
finished item of work

on outer sides of the CRS walls above GL ( 0.75 sides) 1 x 2 1098.00 0.75 1647.00 Sqm 234.88 1 Sqm

447524687.xlsx - 3. BT Road-2 lane-HB Colony


Page 95 of 2191

S No Measurements
Description Nos Qty Rate Per
LB D
18 BLD-CSTN-3-21 - (33) - Damp proof course 50mm thick with cement data- road-
concrete (1:2:4 Nominal mix), using 12mm hard broken stone Sn.51
aggregate including cost of all materials, seigniorage charges,
excluding conveyance charges of materials, including the cost of
machinery, labour charges, mixing, placing in position, leveling,
vibrating, curing etc. complete for finished item of work. (Using
concrete mixer)

Coping over the CRS walls 1 x 2 1098.00 0.35 768.60 Sqm 264.23 1 Sqm
19 BLD-CSTN-2-9 (17) : Filling with useful available excavated earth
(excluding rock) in trenches, sides of foundations and basement with
initial lead in layers not exceeding 15 cm thick, consolidating each
deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental,
labour charges, hire charges of T & P etc., complete for finished item data- road-
of work. (APSS NO. 309 & 310) Sn.74

for filling in side the median with available excavated earth. 1 x 1 1098.00 1.40 0.60 922.32 Cum 29.94 1 Cum
20 Imporatation of good quality red earth congenial for plants grouth of
light textured, crystalline, porous and friable, generally acidic or
neutral but not alkaline, fertile, cost, transportation, loading,
unloading etc complete
for filling in side the median with red earth ( Top Layer) 1 x 1 1098.00 1.40 0.15 230.58 Cum 1231.59 1 Cum
21 RBR-HRTC-1: Spreading of sludge farm yard manure or/ and good
earth in required thickness (cost of sludge, farm yard manure or/and data- road-
Sn.75
good earth to be paid for separately) as per Specification 307
MORTH
Quantity as per collection 230.58 Cum 0.00 1 Cum
A. Cost of Median
Say Rs.
C Construction of CC Drain
22 BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual
Means- for structures in all types of soil as per drawing and technical
specifications and depositing on bank for all lifts and with an initial
lead of 10m including all operational, incidental, labour charges such
as shoring ,sheeting, planking, strutting, etc. complete for finished
item of work including seigniorage excluding dewatering charges etc
for CC SS
as per Drains
- 20on both sides
B (APSS of the road
308). 1 x 2 1098.00 1.10 1.05 2536.38
for RCC culverts 1 x 8 10.00 1.20 1.25 120.00
2656.38 Cum 210.92 1 Cum

447524687.xlsx - 3. BT Road-2 lane-HB Colony


Page 96 of 2191

S No Measurements
Description Nos Qty Rate Per
LB D
23 RBR-FNDN-4 : B-i : .Providing concrete for plain/reinforced concrete
in open foundations using 40 mm nominal size Graded hard stone
aggregate, mechanically mixed, placed in foundation and compacted
by vibration including curing for 14 days complete as per drawings
and technical specifications Clause 802, 803, 1202 & 1203 MORD
and 1500, 1700 & 2100 MORTH. : P.C.C grade M 15 (Design Mix)
MORTH 12.8 A using 40 mm Graded Metal

for CC Drains on both sides of the road 1 x 2 1098.00 1.10 0.10 241.56
for RCC culverts 1 x 8 10.00 1.20 0.15 14.40
255.96 Cum 4733.96 1 Cum
24 Vibrated cement concrete M 15 Grade Concrete using 40mm ,
20mm and 10mm size HBG crushed stone aggregate (Coarse
aggregate conforming to table 1000-1 and fine aggregate conforming
to table 1000-2) including cost and conveyance of all materials to
site and all labour charges for machine mixing,laying in position,
Compacting , Vibrating and curing including all other incidental and
all other operational charges of T&P required etc., complete as per
MoRT&H Specification 1500,1700, 2100 (5th Revision) for footings
and Raft foundation .

Vent portion of CC Drains 1 x 2 1098.00 1.00 0.10 219.60


Vent portion of Culvers 1 x 8 10.00 1.10 0.15 13.20
232.80 Cum 3924.09 1 Cum
25 Vibrated cement concrete M 15 Grade Concrete using 40mm ,
20mm and 10mm size HBG crushed stone aggregate (Coarse
aggregate conforming to table 1000-1 and fine aggregate conforming
to table 1000-2) including cost and conveyance of all materials to
site and all labour charges for machine mixing, laying in
position,Compacting, Vibrating and curing including all other
incidental and all other operational charges of T&P required etc.,
complete as per MoRT&H Specification 1500,1700, 2200 (5th
Revision) for Sub structure .

Drain walls 2 x 2 1098.00 0.275 0.600 724.68


Culvert Walls 2 x 8 10.00 0.325 0.600 31.20
755.88 Cum 4150.48 1 Cum

447524687.xlsx - 3. BT Road-2 lane-HB Colony


Page 97 of 2191

S No Measurements
Description Nos Qty Rate Per
LB D
26 Vibrated reinforced cement concrete M 20 grade using 20mm &
10mm HBG crushed stone aggregate (Coarse aggregate conforming
to table 1000-1 and fine aggregate conforming to table 1000-2)
including cost, conveyance of all materials to site and labour
charges, centering, machine mixing, laying, vibrating, curing etc.,
including other incidental hire and operational charges of all T&P as
per approved drawings and as directed during execution but
excluding cost of steel and its fabrication charges for finished item as
per MoRT&H specification 1500,1600,1700 & 2200 (5th revision )
and as directed by the Engineer-in-Charge for Cover slabs over
side drains
RCC slabs over culverts 1 x 8 10.00 1.10 0.200 17.60 Cum 4488.99 1 Cum
27 Plastering in CM (1:5) 12 mm thick including cost and conveyance of
all materials , labour charges , curing etc complete for finished item
of work as directed by the Engineer -in-Charge
Drain inner walls 2 x 2 1098.00 1.600 7027.20
Drain bottom 2 x 1 1098.00 0.30 658.80
7686.00 Sqm 76.97 1 Sqm
28 BLD-CSTN-2-9 (17) : Filling with useful available excavated earth
(excluding rock) in trenches, sides of foundations and basement with
initial lead in layers not exceeding 15 cm thick, consolidating each
deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental,
labour charges, hire charges of T & P etc., complete for finished item data- road-
of work. (APSS NO. 309 & 310) Sn.74

Total EWE Qty 2656.38 Cum


Deduct CC Bed Qty -255.96
Deduct Drain vent Qty -232.80
Deduct Drain Qty -1 x 2 1098.00 1.00 0.60 -1317.60
Deduct Culvert Qty -1 x 8 10.00 1.10 0.60 -52.80
for filling in side the foot paths with available excavated earth. 797.22 Cum 29.94 1 Cum

447524687.xlsx - 3. BT Road-2 lane-HB Colony


Page 98 of 2191

S No Measurements
Description Nos Qty Rate Per
LB D
29 Providing HYSD bars ( Fe-415 ) of different diameters, wrought and
put up bars of all diameters including cost and conveyance of steel to
site and all labour charges for fabrication of reinforcement including
cutting, bending, binding rods, tying grills, placing them in position
etc., complete including cost and conveyance of binding wire and all
handling charges and operational charges etc., and including over
lapping welding if required etc., complete for all R.C.C items for
finished item of work as per standard drawings, as per the directions
of the Engineer-in-Charge and as per MoRT&H specification 1600 &
2200 (5th revision) and as per I.S.1786 of 1985 for Sub structure
of R.C.C items.

Steel for RCC culvert slabs @ 120Kgs for Cum of RCC 17.60 120.00 Kg/cum 2112.00 kg 56.71 1 kg
Cost of Drains
Say Rs.
D Providing Central Lighting
30 ELEC-7.2.3 : Fabrication, Transportation and supply of hot-dip
galvanized Octogonal Pole with BSEN -10025 grade S 355 JO steel
plate for shaft, IS 2062 for base plate with door opening
arrangement, including the supply of suitable boards with bakelite
sheet and MCB's as per IS specification suitable to withstand the
wind speed of 180 KMPH for 9mtrs height Pole having dimensions
Bottom 155mm, Top 70mm with 3mm thick, base plate 260 x260
x16mm and 4 Nos of M24 x 750 long 'J' bolts along with template
ofMakes: Bajaj / Valmont / TRANSRAIL 1 x 31 31 Nos #REF! 1 Nos
31 ELEC-7.3.3 : Fabrication, Transportation and supply of of
1.5mtrs sword type decorative double arm bracket with dooms
either sides complete with all accessories with MS galvanized
50mm dia Pipe.
1 x 31 31 Nos #REF! 1 Nos
32 ELEC-7.9.3 : Foundation and erection charges with special T&P, for
9.00Mtrs / 10Mtrs long Octagonal / Conical pole duly erecting on
base plate duly providing 4 Nos foundation bolts with nuts with
providing of 0.60Mtr x 0.60Mtrs x 1.40 Mtr size M20 cc work vibrated
concreting mixing with necessary steel (15kgs) reinforcement as
directed by the field engineers during execution including all labour
charges and cost and conveyance of materials etc. complete
1 x 31 31 Nos #REF! 1 Nos

447524687.xlsx - 3. BT Road-2 lane-HB Colony


Page 99 of 2191

S No Measurements
Description Nos Qty Rate Per
LB D
33 ELEC-4.1.10 : Supply of 10 Sqmm 4 Core XLPE insulated, 1100V
grade armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) of Makes : RPG / Finolex / Paragon / V-Guard /
Fortune Art / Suncab / Finecab / Gemscab / Payal.
4 Core 10 Sqmm 1 x 1 1085 1085 Rmt #REF! 1 Rmt
34 ELEC-4.1.12 : Supply of 16 Sqmm 4 Core XLPE insulated, 1100V
grade armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) ofMakes : RPG / Finolex / Paragon / V-Guard /
Fortune Art / Suncab / Finecab / Gemscab / Payal.
4 Core 16 Sqmm 1 x 1 78 78 Rmt #REF! 1 Rmt
35 ELEC-4.8.2 : Supply and Transportation of Outer dia 63mm and
Inner dia 51mm double walled corrugated HDPE duct made as per
specification BSEN - 500 86/IS 14930 Part-II. Makes:DURA LINE
(Dura Guard) or its equivalent make.
51mm dia DWC pipe 1 x 1 1085 1085 Rmt #REF! 1 Rmt

447524687.xlsx - 3. BT Road-2 lane-HB Colony


Page 100 of 2191

S No Measurements
Description Nos Qty Rate Per
LB D
36 Supply and erection of the feeder pillar box of MS sheet of 14 SWG
110 X 700 X 250 mm in size and painted with 2 coats of red oxide
and two coats of synthetic enamel paint of light gray shade (or power
coated). The FPB should be out door type, dust and vermin proof,
confirming to IP – 55 degree of protection as per IS – 2147. The
inner door of the box should be having an interlocking arrangement.
Single compression cable glands and crimping type lugs shall be
carried out with copper standard conductor, flexible PVC insulated
1100
a) OutVdoor
grade wire.
with The FPBhinges
concealed shouldandconsists the following.
neoprene sponge gasket.
b) Hinged inner door.
c) MS bracket for pad locking facility with Canopy.
d) 3 Nos siemen’s type door lock with key on outer door.
e) Dancer notice plate.
f) MS base channel 50 x 50 x 3 mm thick and 2 Nos thumb screws.
g)1 No Micro processed based electronic timer.
h) 3 Nos 63 A HRC fuses EE or equivalent make. LS
k) 4 Nos 60 A TPN MCB’s as out going MDS / Havell’s
l) 4 Nos 25 x 6mm thick alluminium bus bars for R.Y.B phases and
neutral mounted rigidly on suitable insulators.
m)1 No 110 A Contactor (ML – 6) L&T make.
n) 1 No kaycee make auto / mannual switch.
o) Removable undrilled MS painted cable gland plate.
p) MS base plate for mounting switch gear components.
q) 4 Nos foundation holes in base channel to suit M 12 foundation
bolts.
r) 4 Nos 4 way terminal blocks for outgoing cricuits open barrier type
balson / Everest / Essen or equivalent make (1 No. 100 A four way
terminal block for incoming open barriers type or balson / everest /
essen or equivalent make.
s) 2 Nos earthing studs (M10) with nut and spring washer etc,.

1 x 2 2 job 32000 1 job


37 ELEC-10.7.51 :Supply of 3 Core x 2.5 Sqmm FRLS armoured copper
cable as per IS. 7098 / Part-I / 1988 including all taxes etc., complete
of make Universal/ CCI /Unicab/Polycab / Finolex / KEI / Havells.

3 Core x 2.5 Sqmm FRLS armoured copper cabl 1 x 1 698 698 Rmt #REF! 1 Rmt
38 ELEC-4.4.1 : Supply and fixing of crimping type copper lugs
confirming to I.S specifications for cable upto 16 Sq.mm including
nuts and bolts with connections
Copper lugs 1 x 248 248 Nos #REF! 1 Nos
447524687.xlsx - 3. BT Road-2 lane-HB Colony
Page 101 of 2191

S No Measurements
Description Nos Qty Rate Per
LB D
39 ELEC-4.3.5 : Supply and Fixing of single compression brass cable
glands for 4 core XLPE armoured cable up to 16.0 Sq.mm with
brass washers complete.
Brass cable glands 1 x 4 4 Nos #REF! 1 Nos
40 ELEC-9.1.56 : Supply and laying of 40mm Nominal Bore medium
grade G.I.Pipe including cost and conveyance etc, complete.
40mm Nominal Bore medium grade G.I.Pipe 1 x 1 62 62 Rmt #REF! 1 Rmt
41 ELEC-3.5.1: Supply & Installtion of Automatic Street Light Control
System with Optical Sensor, Low volatage / High voltage trip and
reset, operating voltage 150 - 280V AC, 50 HZ with suitable SMC
enclousure of IP 54 protection, MCBs and contactor suitable to
control the load of 3 KW of single phase load with necessary
clamping arrangements. Makes : Swadeep Nature Switch / Light
Mate. 1 x 1 1 No #REF! 1 No
42 BLD-ELEC-5-1-1 : Providing independent earthing for sophisticated
equipment like computer medical Equipment, Electronic Gadgets
etc., with 600mm x 600mm x3.15 mm thick copper plate rigidly fixed
to the 40mm dia GI pipe of 2.5 Mtrs. Length and 19mm dia ‘B’ class
GI pipe of 0.3 M long connected with reducer providing GI funnel
covers with wire mesh of suitable size staggered holes of 16 Nos of
12mm dia to the earht electrode, enclosed in a CC chamber of
400mm x 400mm x 400mm covered with reinforced cement concrete
cover and all labour charges RCC slab cover duly filing salt and
charcoal in layers from the bottom of the earth pit, giving earth
connections from the electrodes to GI strip 25 x 6 x 200mm length 1 x 2 2 Nos 3906.33 1 Nos
provided with holes GI washers, boths and labour charges etc.,
43 BLD-ELEC-7-4-2 : Supply and erection of Integral street light
complete.
luminaire of 150W MH lamp fitting comprises of single piece die cast
Aluminium body with copper wound ballast and capacitor, Ignitor,
with pot optics including 150W MH lamp etc., complete.
150W MH lamps 2 x 31 62 Nos 5538.73 1 Nos
44 Laying of PVC armoured under ground cable in existing duct as
directed by the department including cost and conveyance of all
materials and labour charges etc., complete.
Armoured cable 1 x 1 1194 1194 Rmt 15.00 1 Rmt
45 Laying of 63mm and Inner dia 51 mm double walled corrugated
HDPE as directed by the department including cost and conveyance
of all materials and labour charges etc., complete.
Laying DWC pipe in Median 1 x 1 1085 1085 Rmt 15.00 1 Rmt

447524687.xlsx - 3. BT Road-2 lane-HB Colony


Page 102 of 2191

S No Measurements
Description Nos Qty Rate Per
LB D
46 Supply of 6-32A !OKA SP MCB, C/D Curve ISI Mark. Makes :
Legrand- DX3 / Schneider-Acti9 / Siemens / L&T / Exora. As per SSR
No: ELEC2.9.1,
Supply of 63A 4 SI.
Way No: 282
Connector 1 x 62 62 Nos #REF! 1 Nos
47 Supply and Run of No.8 SWG G.1 wire including cost of all
accessories and labour charges etc., complete .
1 x 279 279 Rmt #REF! 1 Rmt
48 Fabrication supply and errection of water tight M.S junction Box 260
x 300 x 140 mm (depth) size and 16 guage MS sheet with fixing
arrangements, with necessary holes for cable entry and exit from the
box. The box shall be provided with cover and hinges on one side
and bolting at other end. The box shall be fixed by clamps fabricated
from 25mm x 3mm MS flat. The box consisting of 2 Nos of MCB and
1 No of 60 AMPS ‘L’ way consider doubl arm and box shall be
painted with one coat of Red Oxide and two coats aluminium paint
including transportation etc., complete for finished item of work. 1 x 3 3 Nos 5751.83 1 No
Total Amount Rs.
Say
Total of A+B+C+D
Say

447524687.xlsx - 3. BT Road-2 lane-HB Colony


Page 103 of 2191

Amount

177072.00

#REF!

#REF!

447524687.xlsx - 3. BT Road-2 lane-HB Colony


Page 104 of 2191

Amount

288554.00

2258854.00

6256316.00

447524687.xlsx - 3. BT Road-2 lane-HB Colony


Page 105 of 2191

Amount

417824.00

7135427.00

105199.00

2356584.00
447524687.xlsx - 3. BT Road-2 lane-HB Colony
Page 106 of 2191

Amount

453244.00

2777087.00

29870.00
#REF!

447524687.xlsx - 3. BT Road-2 lane-HB Colony


Page 107 of 2191

Amount
#REF!

447524687.xlsx - 3. BT Road-2 lane-HB Colony


Page 108 of 2191

Amount

46489.00

415653.00

3368127.00

386847.00

447524687.xlsx - 3. BT Road-2 lane-HB Colony


Page 109 of 2191

Amount

203087.00

27614.00

283980.00

0.00
4731797.00
47.32 Lakhs

560284.00

447524687.xlsx - 3. BT Road-2 lane-HB Colony


Page 110 of 2191

Amount

1211704.00

913528.00

3137265.00

447524687.xlsx - 3. BT Road-2 lane-HB Colony


Page 111 of 2191

Amount

79006.00

591591.00

23869.00

447524687.xlsx - 3. BT Road-2 lane-HB Colony


Page 112 of 2191

Amount

119772.00
6637019.00
66.37 Lakhs

#REF!

#REF!

#REF!

447524687.xlsx - 3. BT Road-2 lane-HB Colony


Page 113 of 2191

Amount

#REF!

#REF!

#REF!

447524687.xlsx - 3. BT Road-2 lane-HB Colony


Page 114 of 2191

Amount

64000.00

#REF!

#REF!
447524687.xlsx - 3. BT Road-2 lane-HB Colony
Page 115 of 2191

Amount

#REF!

#REF!

#REF!

7812.66

343401.26

17910.00

16275.00

447524687.xlsx - 3. BT Road-2 lane-HB Colony


Page 116 of 2191

Amount

#REF!

#REF!

17255.49
#REF!
#REF!
#REF!
#REF!

447524687.xlsx - 3. BT Road-2 lane-HB Colony


SCHEDULE - 'A'
BILL OF QUANTITIES - ( PART - I )

Development of Roads and Providing Central Lighting under TUFIDC Assistance in Kodada Municip

Probable
S.No Description of Item Rate UOP
Qty
Quantity UOM
(I)Laying of BT Roads, including traffic sign,
marking and other appurenaces at various
localities
Excavation for roadwork in soil with hydraulic
excavator of 0.9 cum bucket capacity including
cutting and loading in tippers, trimming bottom and
side slopes, in accordance with requirements of lines,
1 26077.37 Cum grades and cross-sections, and transporting to the 84.62 Cum
embankment location with all lifts and lead upto 1000
m as per Technical Specification Clause 302.3 MORD
/ 301 MORTH

Loosening of the ground upto a level of 300 mm


below the subgrade level, watered, graded and
compacted in layers to meet requirement of Tables
2 13999.38 Cum 300.1 and 300.2 for subgrade construction as per 104.25 Cum
Technical Specification Clause 303.5.2 MORD / 305
MORTH. RBR-EECD-16

Conveyance of excavated earth up to 5.00 km


3 5215.47 Cum including loading, unloading and conveyance ,etc, 180.10 Cum
complete.
Construction of granular sub-base by providing
coarse graded material grade-III , spreading in
uniform layers with motor grader on prepared surface,
mixing by mix in place method with rotavator at OMC,
4 9541.03 Cum and compacting with vibratory roller to achieve the 1373.66 Cum
desired density, complete as per clause 401 MORTH.

Providing, laying, spreading and compacting graded


stone aggregate to wet mix macadam specification
including premixing the material with water at OMC in
mechanical mixer (Pug Mill), carriage of mixed
material by tipper to site, laying in uniform layers in
sub-base/base course on a well prepared sub-base
and compacting with smooth wheel roller of 80 to
5 11572.09 Cum 100kN / Vibratory Roller 80-100 kN weight to achieve 1910.60 Cum
the desired density including lighting, barricading and
maintenance of diversion, etc as per Tables 400.11 &
400.12 and Technical Specification Clause 406
MORD / MORTH.
Providing and applying primer coat with bitumen
emulsion (SS2) on prepared surface of granular Base
including clearing of road surface and spraying primer
6 46664.50 Sqm at the rate of 0.60 kg/sqm using mechanical means 25.10 Sqm
as per Tech. specification No 502 MORTH.

Providing and applying tack coat with bitumen


emulsion (RS-1)using emulsion pressure distributor at
the rate of 0.20 kg per sqm on the prepared
7 46664.50 Sqm bituminous/granular surface cleaned with mechanical 9.41 Sqm
broom as per Tech. specification No 503 MORTH

Providing and laying bituminous macadam with 100-


120 TPH / 40-60 TPH hot mix plant producing an
average output of 75 tonnes/ 37.50 t per hour using
crushed aggregates of specified grading premixed
with bituminous binder 3.3% , transported to site, laid
8 3448.92 Cum over a previously prepared surface with paver finisher 6505.71 Cum
to the required grade, level and alignment and rolled
as per clauses 501.6 and 501.7 to achieve the
desired compaction as per Tech. specification No. 504
MORTH.

Providing and laying bituminous concrete with 100-


120 TPH batch type hot mix plant producing an
average output of 75 tonnes per hour using crushed
aggregates of specified grading, premixed with
bituminous binder @ 5.4 to 5.6 per cent of mix and
filler, transporting the hot mix to work site, laying with
a hydrostatic paver finisher with sensor control to the
9 1829.09 Cum 8311.64 Cum
required grade, level and alignment, rolling with
smooth wheeled, vibratory and tandem rollers to
achieve the desired compaction as per MORTH
specification clause No. 509 complete

Providing and filling with gravel brought from out side


and labouur charges for filling and spreading in layers
of not more than 150mm thick each or as directed by
10 1430.00 Cum engineer-in-charge during execution, watering, 198.38 Cum
compacting each layer, labour charges for all
operations, all water leads etc complete.

Construction of Culvert
RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00
Mts depth below GL by Manual means: Earthwork
excavation in all kinds of soil for Pipe line trenches as
per drawings and technical specifications including
setting out, construction of shoring and bracing,
removal of stumps and other deleterious material ,
dressing of sides and bottom as per Technical
Specification 305 MoRD / 304 MoRTH and as
directed by the departmental officer including
protecting the existing utility services wherever it is
11 581.18 cum possible during the execution and taking all 210.92 cum
precautionary measures in the restricted areas for
laying sewer/water pipe lines including divertion of
traffic and backfilling in trenches with excavated
suitable material and disposal of remaining earth
upto a lead of 50 m, including all incidental and
operational charges etc., complete by manual
means.

Dewatering pipe line trenches etc, duly bailing out


water from the pipe line trenches with oil engine
driven pumpsets, including hire charges, fuel charges
and wages for Driver and Helper and all other
12 200.00 1 Hphr incidental and operational charges including suction 52.72 1 Hphr
and delivery hose, lead of drain in to natural drain etc,
complete.

BLD-CSTN-2-8 (16): Collection, Supply and filling


with HBG stone chips 2.36 mm & below from
approved quarry to work site and stacking at work site
to Dept. gauge for premeasurements including cost
13 27.90 cum and convenyance of all material and all labour 910.40 cum
charges etc. complete as per standard specifications.
Clause 305.3.9 MORD & 304 MORTH

BLD-CSTN-3-5 (22) : Plain Cement concrete nominal


mix (1:4:8) prop (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine
Crushed Metal including cost and conveyance of all
materials like cement, sand, coarse aggregate water
etc., to site, labour charges , for mixing , laying,
14 20.93 cum concrete , ramming in 15 cm layers, finishing top 4252.08 cum
surface to the required level curing etc., complete for
finished item of work.for foundation and under
flooring bed.
BLD-CSTN-3-14-(31) - A : Supply and placing of the
M-25 Design Mix Concrete corresponding to IS 456
using WEIGH BATCHER with 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
including all operational, incidental and labour
charges such as weigh batching, machine mixing,
15 60.40 cum laying concrete, vibrating, curing, centering and 7604.69 cum
suttering charges etc.,complete but excluding
seignorage charges, cost of steel and its fabrication
charges for finished item of work (APSS No. 402)
with minimum cement content as per IS code-Base
slab.

BLD-CSTN-3-14-(31) - A : Supply and placing of the


M-25 Design Mix Concrete corresponding to IS 456
using WEIGH BATCHER with 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
including all operational, incidental and labour
charges such as weigh batching, machine mixing,
laying concrete, vibrating, curing, centering and
suttering charges etc.,complete but excluding
seignorage charges, cost of steel and its fabrication
charges for finished item of work (APSS No. 402)
with minimum cement content as per IS code.

16 90.72 cum Side wall 11482.84 cum


17 36.00 cum Top slab 400mm thick 7481.97 cum
BLD-CSTN-4-1-(34) : Providing High Yield Strength
Deformed (HYSD)/ Thermo Mechanically Treated
(TMT) / Mild steel (MS) steel bars (Fe 500 grade as
per IS 1786-1979) of different diameters for RCC
works , including labour charges for straightening,
cutting, bending to required sizes and shapes,
placing in position with cover blocks of approved
materials and size and tying and lap-splicing with
binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and
18 18712.00 kg drawings, including cost and conveyance of steel 68.71 kg
bars, including all wastages such as overlaps,
couplings, chairs, spacer bars including cost and
conveyance of binding wire, cover blocks and all
incidental, operational, labour charges such as
cutting, bending, placing in position, tying complete
for finished item of work in all floors.( APSS No.126
Supplying and fixing of 110mm dia PVC pipes for
weep holes including material, labour charges like
19 48.00 mts cutting size, fixing in side wall etc as directed by 265.86 mts
Engineer- in- charge
Carting of surplus excavated rock/Soil within a lead of
5Km from the site to a distance suitable including
20 348.71 cum loading charges, cost & conveyance, dumping, labour 180.10 cum
charges and other incidental and operational charges
etc., complete.

BLD-CSTN-2-8 (16) : Filling with gravel with initial


lead in layers not exceeding 15 cm thick,
consolidating each deposited layer by watering and
ramming including cost and conveyance of water to
21 69.74 cum work site and all operational, incidental, labour 198.38 cum
charges, hire charges of T & P etc., complete for
finished item of work. (APSS NO. 309 & 310)

Road Markings and Safety sign Boards


Pavement markings with hot applied thermoplastic
material complete as per drawing and Technical
22 819.36 Sqm Specifications clause 803.a) Lane / Centre line / 667.91 Sqm
Edge marking / and Pedestrian passage / Arrows all
other road marking etc.

Providing and fixing junction boards of size


1500x1200mm madeout of type XI of ASTMD 4956-
09 wide angle cube cornered micro Prismatic Retro
reflective sheeting and confiriming to IRC 67:2012 for
full backround of Green colour & white Letters and
fixed over 4MM Alluminium Composite Material sheet
having minimum 0.5 mm thick Aluminium skin on both
sides with back side painted grey colour and fixed
over back support frame of M.S angle 25X2X3mm all
round and fixing with 5x35x4mm and mounted on a
MS angle post of size 75x75x6mm with clear height of
not less than 2.1 m from the ground level to the
bottom of the board. the signpost should be painted
with one coat of red oxide paint and 2 coats of
23 6.00 No synthetic enamel paint black and white colour with 26998.00 No
bands of 30cm of height . The signposts shall be
firmly fixed with MS base angle 35x35x4 mm in to the
ground by M-15 concrete foundation of size
450x450x600mm including cost and conveyance of
alla materials, equipment, machinery and labour with
all leads and lift , loading charges necessary for
satisfactory completion of the work as directed by
Engineer-in-charge.
Providing and fixing Village/town name board size
600x800 mm made out of Type – XI of ASTMD 4956-
09 wide angle cube cornered micro Prismatic Retro
reflective sheeting and confirming to IRC 67:2012 for
full background of Green Colour & White Letters and
fixed over 3MM Alluminium Composite Material sheet
having minimum 0.30mm thick Aluminium skin on
both sides with back side painted grey colour and
fixed over back support frame of M.S angle
25x25x3mm all round and fixing with 35x35x4mm and
mounted on a MS angle post of size
75x75x6mm with clear height of not less than 2.1 m
from the ground level to the bottom of the board. The
signpost should be painted with one coat of red oxide
24 3.00 No paint and 2 coats of synthetic enamel paint Black and 7432.00 No
White colour with bands of 30cm of height. The
signpost shall be firmly fixed with MS base angle
35x35x4 mm in to the ground by M-15 Concrete
foundation of size450x450x600mm including cost and
conveyance of all materials ,equipment, machinery
andlabour with all leads and lift, loading charges
necessary for satisfactory completion of the workas
directed by Engineer –in-Charge.

b) Cautionary signs
Providing and fixing Cautionary / Warning sign boards
size 900 mm equilateral triangle made out of Type –
XI of ASTMD 4956-09 wide angle cube cornered
micro Prismatic Retro reflective sheeting and
confirming to IRC 67:2012 for full background of
White colour and letters/logos
done by screen printing in Black colour, boarders by
screen printing in Red colour and fixed over 4MM
Aluminium Composite Material sheet having minimum
0.5 mm thick Aluminium skin on both sides with back
side painted grey colour and fixed over back support
frame of M.S angle 25x25x3mm all round and fixing
with 35x35x4mm and mounted on a MS angle post of
size 75x75x6mm with clear height of not less than 2.1
m from the ground level to the bottom of the board.
25 10.00 No The signpost should be painted with one coat of red 6226.00 No
oxide paint and 2 coats of synthetic enamel paint
Black and White colour with bands of 30cm of height.
The signpost shall be firmly fixed with MS base angle
35x35x4 mm in to the ground by M-15 Concrete
foundation of size 450x450x600mm including cost
and conveyance of all materials ,equipment,
machinery and labour with all leads and lift, loading
chages necessary for satisfactory completion of the
work as directed by Engineer -in-Charge.
Supplying and installation of Hazard Marker using
M.S. angle of size 55x55x6mm and 120cm high
above ground level painted with two coats of black &
white stripes of 15cm wide with firstquality synthetic
enamel paint over one coat of appropriate primer of
approvedbrand,colour, with 30cm x 90cm Type – XI of
ASTMD 4956-09 wide angle cube cornered micro
Prismatic Retro reflective sheeting of Yellow colour
and confirming to IRC 67:2012 fixed over 3MM
Alluminium Composite Material having minimum 0.30
mm thick Aluminium skin on both sides with standard
supports consisting of alternately black and Yellow
with black stripes in screen printing sloping downward
at an angle of 45 degrees towards the side of the
obstruction onwhich the traffic is to pass and buried
26 6.00 No into the ground in a trench of size 30cm x 30cm and 4003.00 No
50cm depth filled with CC M-20 including cost and
conveyance of all materials, equipment, machinery
and labour with all leads and lifts, loading and un-
loading charges necessary for successfull completion
of the work on any road in division as directed by
Engineer-in-Charge andconforming to IRC 67-2012
&MORT&H specification No.805 and approved
drawings etc., complete for finished item of work.

Supply and Application of Alluminium Backed flexible


prismatic sheeting (AFP) which shall be of 1ft width
Sq ft) and laminated at the back with a 50 micron
thick Aluminum (Al) foil with pressure sensitive
adhesive and liner. Further, this flexible prismatic
sheeting shall have screen printed arrow/slant line
pattern in black color on top in a continuous roll
format. Neither AFP sheeting nor the flexible prismatic
sheeting used in it shall crack when slowly bent in 1
second time around a 1/8th inch mandrel after being
conditioned for 24hrs at 0°C and tested as per section
S2.2.2. of ASTM D 4956-09. The AFP sheeting, with
the liner removed, shall be applied with aneoprene
contact adhesive with Polychloroprene as base,
27 100.00 Sft viscosity of 200-450 cps and solid content of 20-30%. 452.00 Sft
Once applied, the edges of the product shall be
sealed all around with a two-part epoxy based
structural adhesive and shall be extremely resistant to
peel-off. A test report from institutes like ARAI/CRRI
confirming to above
mentioned flexibility and ASTM-D4956-09 Type-VI
retro reflectivity performance of the flexible prismatic
sheeting used in AFP shall be submitted by the
tenderer during prequalification and supply of
material.
c) Mandatory signs, size
Providing and fixing Mandatory / Regulatory sign
boards size 600 mm circle made out of Type – XI of
ASTMD 4956-09 wide angle cube cornered micro
Prismatic Retro reflective sheeting and confirming to
IRC 67:2012 for full background of White colour and
letters/logos done by screen printing in Black colour,
boarders by screen printing in Red colour and fixed
over 3MM Alluminium Composite Material sheet
having minimum 0.30mm thick Aluminium skin on
both sides with back side painted grey colour and
fixed over back support frame of M.S angle
25x25x3mm all round and fixing with 35x35x4mm and
mounted on a MS angle post of size 75x75x6mm with
clear height of not less than 2.1 m from the ground
level to the bottom of the board. The signpost should
be painted with one coat of red oxide paint and 2
28 4.00 No coats of synthetic enamel paint Black and White 5169.00 No
colour with bands of 30cm of height. The signpost
shall be firmly fixed with MS base angle 35x35x4 mm
in to the ground by M-15 Concrete foundation of
size450x450x600mm including cost and conveyance
of all materials ,equipment, machinery and labour with
all leads and lift, loading charges necessary for
satisfactory completion of the work as directed by
Engineer -in-Charge.

Supplying and installation of delineators (Roadway


indicators) not less than 800mm high above ground
level. The delineator shall have a core and shell
construction which shall be made of tough, high
impact resistant, injection-molded, thermoplastic outer
body. The inner core shall consist of powder coated or
painted Mild steel of minimum thickness 1.0mm. The
delineator should have top retro-reflective unit
consisting of white color micro prismatic non metallic
retro-reflective sheeting of minimum exposed area of
125 cm2 and bottom retroreflective unit consisting of
29 120.00 No red color micro prismatic non metallic retro-reflective 1541.00 No
sheeting of minimum exposed area of 35 cm2
confirming to ASTM D4956 type XI standards. The
delineators shall be fixed to the ground by inserting
the root of the delineator up to the marked portion and
by firm concrete filling as per the instructions by
engineer in-charge.
Supplying & Fixing of Moulded Shanks Raised
Pavement Markers made of plastic body moulded
from HIPS(HIImpact Polysterene) or ABS or ASA
( Acrylic Strene Acrylonitrite and reflective panels with
micro prismatic lens capable of providing total internal
reflection of the light entering the lens face and shall
support a load of 13635 kg tested in accordance to
ASTM D 4280 Type H and complying to
Specifications of Category A ofMORTH Circular No
RW/NH/33023/10-97 – DO III Dt 11.06. 1997. The
height and width shall not exceed 20 mm and 130
mm with minimum reflective area of 13 Sqcm on each
side and the slope to the base shall be 35 +/- 5
30 5700.00 No degree. The strength of detachment of the integrated 316.00 No
cylindrical shanks, (of diameter not less than 19 +/- 2
mm and height not less than 30+/- 2 mm) from the
body is to be a minimum value of 700 Kgs. Fixing will
be by drilling holes on the road for the twin shanks to
go inside, without nails and using epoxy resin based
adhesive as per manufacturer’s recommendation and
complete as directed by the engineer.

(II)Construction of Divider in Various Roads in


Kodada Municipality

Cutting open BT road surface (as well as asphalt


concrete upto 75 mm thick ) including water bound
macadam and stacking of excavated materials for
31 3024.00 cum 1183.87 cum
pipe line trench work. as directed by the departmental
officers.

BLD-CSTN-2-1 (9): Earth work excavation in Ordinary


Soil by Manual Means-Upto 3 m depth for foundations
and depositing on bank for all lifts and with an initial
lead of 10m including all operational, incidental,
labour charges such as shoring ,sheeting, planking,
32 567.00 cum strutting, etc. complete for finished item of work 210.92 cum
including seigniorage excluding dewatering charges
etc as per SS - 20 B (APSS 308).

BLD-CSTN-3-11-(28) Plain Cement concrete M20


grade nominal mix(Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine
Crushed Graded Metal including cost and
conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , labour charges , for
mixing , laying, concrete , ramming in 15 cm layers,
33 850.50 cum 5248.25 cum
finishing top surface to the required level curing etc.,
complete for finished item of work with nomonal
reinforcement for base
BLD-CSTN-3-11-(28) Using Concrete mixture up to
Plinth Level : Plain Cement concrete M20 grade
nominal mix(Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine
Crushed Graded Metal including cost and
conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , labour charges , for
34 3557.93 cum 5551.03 cum
mixing , laying, concrete , ramming in 15 cm layers,
finishing top surface to the required level curing etc.,
complete for finished item of work with nomonal
reinforcement for side wall

BLD-CSTN-2-8 (16) : Filling with red earth in


central divider portion with initial lead in layers not
exceeding 15 cm thick, consolidating each deposited
layer by watering and ramming including cost and
35 6426.00 Cum conveyance of water to work site and all operational, 653.68 Cum
incidental, labour charges, hire charges of T & P etc.,
complete for finished item of work. (APSS NO. 309 &
310)

RBR-HRTC-5 ; Turfing lawns with fine grassing


including ploughing, dressing including breaking of
clods, removal of rubbish, dressing and supplying
doobs grass roots at 10 cm apart, including supplying
36 9450.00 sqm and spreading of farm yard manure at rate of 0.6 cum 37.60 sqm
per 100 sqm - as per Specification 307 MORTH

RBR-HRTC-8 : Planting flowering plants and shrubs


37 9450.00 Rmt in central verge as per Specification 307 MORTH 124.94 Rmt

(III) Providing Double Arm Central Lighting at


various places in Kodad Municipality
Fabrication, Transportation and supply of hot-dip
galvanized Octogonal Pole with BSEN - 10025 grade
S 355 JO steel plate for shaft, IS 2062 for base plate
with door opening arrangement, including the supply
of suitable boards with bakelite sheet and MCB's as
per IS specification suitable to withstand the wind
speed of 180 KMPH for 9 Mtrs height Pole having
38 398.00 No.s dimensions Bottom 155mm, Top 70mm with 3mm 19173.67 each
thick, base plate 260 x 260 x 16mm and 4 Nos of M24
x 750mm long 'J' bolts along with template. Makes:
BAJAJ / VALMONT / TRANSRAIL / SKIPPER /
UTKARSH / LAASMA

Fabrication, Transportation and supply of MS


galvanized 50mm dia Pipe 1.5 Mtr sword type or any
39 398.00 No.s decorative double arm bracket with dooms etc 5748.92 each
complete with all accessories
Foundation and erection charges with special T&P, for
9.00Mtrs / 10Mtrs long Octagonal / Conical pole duly
erecting on base plate duly providing 4 Nos
foundation bolts with nuts with providing of
0.60Mtrx0.60Mtrsx1.40 Mtr size M20 cc work vibrated
concreting mixing with necessary steel (15kgs)
reinforcement as directed by the field engineers
40 398.00 No.s during execution including all labour charges and cost 7157.75 each
and conveyance of materials etc. complete. as
directed by the field engineers during execution
including all labour charges and cost and conveyance
of materials etc. complete.

Supply and transportation of 150Watts LED Street


light Body made of high grade pressure die – cast
Aluminium alloy with corrosion resistant powder coat,
having protective toughened glass cover, Less Glare,
IP 66 (Silicon gasket sures Optical & Electrical
compartments are IP 66) protected, wide operating
voltage range, P.F > 0.90, System having efficacy
>100 lumens/watt, with Ingress protection IP66,
Driver surge protection more than 4KV, THD<15%,
CCT: 3000- 6500K as desired by the department and
as per IS, CRI>80, Inbuilt Electrical protections like
41 796.00 No.s Over voltage, short circuit, Over load, Open Circuit, 17021.80 each
Miswiring, etc complete with 5 years warranty.
LUMINAIRE MAKE : PHILIPS / OSRAM / GE /
CROMPTON / BAJAJ / SCHREDER / VIN / HALONIX
/ HAVELLS / HPL / SURYA / SYSKA. LED MAKE :
PHILIPS LUMILEDS / CREE / NICHIA / OSRAM /
SAMSUNG / LG LEDs.

Supply and fixing of suitable out door feeder piller box


of size made with 14 SWG CRCA sheet with double
door arrangement, making powder coating after
processing of 7 Tank process, lock and key,hinges,
rubber gasket, danger board,suitable angle iron
stand for mounting the feeder pillar with cement
concrete, including Supply and fixing of Legrand /
Schnieder make as out goings, indication lamps, din
42 40.00 No.s channel, 6 Sqmm 3 core copper cable for invidual 20153.03 each
light control, connectors, gland plates and provision
for 3 phase energy meter etc., complete for finished
item of work and suitable wiring provision for
connecting the nature switch with following.(63A, 4
Pole isolator as incomer, 6 Nos 6-32A SP MCBs)
Providing independent earthling by excavating a
trench to a depth of 2.1 M in all soils, as per size
specified in the Data, using 40mm dia 'B' class GI
pipe of 2.5 Mtrs length with necessary accessories
43 40.00 No.s with hume pipe ring duly providing staggered holes 3730.97 each
including filling with equal proportion of Salt and
Charcoal in layers and all labour charges etc.,
complete for small quarters.

Supply and Transportation incluiding Earth work


excavation and laying charges of Outer dia 63mm
and Inner dia 51mm double walled corrugated HDPE
duct made as per specification BSEN - 500 86/IS
44 8760.00 Rmt 200.84 Rmt
14930 Part-II. Makes:DURA LINE (Dura Guard) or its
equivalent make.51mm dia DWC pipe

Supply and Transportation of Outer dia 50 mm and


Inner dia 38 mm double walled corrugated HDPE duct
made as per specification BSEN - 500 86/IS 14930
45 3980.00 Rmt Part-II. Makes:DURA LINE (Dura Guard) or its 103.39 Rmt
equivalent make.51mm dia DWC pipe

Supply and fixing of Automatic Street Light Control


System with Optical Sensor, Low volatage / High
voltage trip and reset, operating voltage 380 - 450 V
AC, 50 HZ with suitable SMC enclousure of IP 54
protection, MCBs of Legrand / Schneider / L&T /
Siemens of 10KA C/D curve and Contactor suitable to
46
control the load of 12KW three phase load with
necessary clamping arrangements. Makes : Swadeep
Nature Switch / Light Mate / L&T / Siemens / Bajaj.

10.00 Nos 19996.24 Nos


Supplying and erecting of 50Sq.mm 3 ½ core PVC
armoured U.G cable 1100V grade with ISI mark
following strand/solid aluminium conductor by making
trench in soil up to 0.9m deep embedding the cable
complete with sand bed of 20cm, thick layers and
bricks placed on top of the cable width wise all over
the run and backfilling the excavated earth without
stones and hard materials and making the surface
proper, 8 SWG GI wire including glands, lugs,
47 876.00 Rmt including crimping job, to be laid partly in trench, 490.80 Rmt
partly in ground with cable indicators at 8 Meter
interval etc, complete as directed by site In-Charge
for service connections etc., complete. (Asian /
Universal / Paragon/ Finolex / Polycab / Powerflex)
from feeder pillars to Meter box.and as per the
directions of the Engineer.
Supply and laying of 16 Sqmm 4 Core XLPE
insulated, 1100V grade armoured alluminium cable as
per specification confirming to IS:7098 (Part - I).
48 8760.00 Rmt 215.87 Rmt
Makes : Torrent / Universal / Unicab / Polycab /
Havells / Gloster / KEI or equivalent

Supply and laying of 4.0 Sqmm (56/0.3) 2 Core PVC


Insulated, Flexible Armouring Flexible Copper cable
as per IS 7098 / Part-I / 1988 including all
49 transportation charges etc complete. Makes :
Finolex / RR kabel / avells / Polycab / RPG / KEI /
Nakoda / Gemni / HPL / Gloster

3980.00 Rmt 138.61 Rmt


Supply and fixing of 6-32A 10KA SP MCB, C/D Curve
50 ISI Mark. Makes : Legrand-DX3 / Schneider-Acti9 /
Siemens / L&T,Exora.
398.00 no's 219.28 each
Supply and fixing of single compression brass cable
glands for 3 1/2 core XLPE armoured cable up to
51 50Sq.mm with brass washers complete

796.00 no's 25 Sqmm to 50.0 Sq.mm 3.5 Core 247.73 each


Supply and fixing of heavy duty long barrel copper
lugs confirming to I.S specifications suitable for 16
52 sqmm cable etc complete with nuts, bolts and
washers. Makes: DMI / Jainson / Dowels
796.00 no's 16 sqmm 53.40 each
Supply of single compression brass cable glands for 4
53 core XLPE armoured cable up to 16.0 Sq.mm with
brass washers complete
796.00 no's 203.42 each
Supply of heavy duty long barrel copper lugs
confirming to I.S specifications suitable for 16 sqmm
54 cable etc complete with nuts, bolts and washers.
Makes: DMI / Jainson / Dowels

796.00 no'sup to 16 sqmm 22.72 each


(IV) Laying CC Road
Removal of unsuitable / Unserviceable soil including
excavation by mechanical means, loading and
disposal upto 1000 m lead including compaction upto
OMC, ground supporting embankment subgrade
55 377.20 Cum replacement by suitable soil as per Clause 303.5.2 84.62 Cum
as per Technical Specification Clause 302.3.11 MORD
/ 301 MORTH and directed by Engineer-in-Charge

56 Construction of granular sub-base by providing


coarse graded material grade-III , spreading in
uniform layers with motor grader on prepared surface,
mixing by mix in place method with rotavator at OMC,
565.80 Cum and compacting with vibratory roller to achieve the 1373.66 Cum
desired density, complete as per clause 401 MORTH.
57 Providing Plain Cement Concrete (1:4:8) mix using
20mm size HBG crushed stone aggregate and fine
aggregate conforming to table 1000-2 of MoRT&H
including cost, conveyance of all materials to site and
labour charges, centering, machine mixing, laying,
Vibrating, curing etc., including all other incidental and
operational charges of all T&P etc., complete for
164.00 Cum finished item of work as per MoRT&H specification 4252.08 Cum
1500, 1700, 2100 (5th Revision) and as directed by
the Engineer-in-Charge for base coarse below CC
Pavement.

58 Construction of plain cement concrete pavement


150mm thickness as per design, over a prepared sub
base, with 43 grade cement or any other type as per
Clause 1501.2.2 M30 (Grade), coarse and fine
aggregates conforming to IS : 383, maximum in a
concrete mixer of not less than 0.2 cum capacity and
appropeiate weigh batcher using approved mix
design, laid in approved fixed side formwork (steel
channel, laying and fixing of 125 micron thick
polythene film, wedges, steel plates including levelling
the formwork as per drawing), spreading the concrete
with sholvels, rakes, compacted using needle,
scareed and plate vibrators and finished in continuous
492.00 Cum operation including provision of contraction and 5743.89 Cum
expansion, construction joints, applying debonding
strips, primer, sealant, dowel bars, near approaches
to bridge / culvert and construction joints, admixtures
as approved, curing of concrete slabs for 21- days,
curing compound (where specified) and water
finishing to lines and grade as per drawing and
Technical Specification Clause 1501 MORD.

59 BLD-CSTN-2-8 (16) : Filling with gravel with initial


lead in layers not exceeding 15 cm thick,
consolidating each deposited layer by watering and
ramming including cost and conveyance of water to
246.00 Cum work site and all operational, incidental, labour 198.38 Cum
charges, hire charges of T & P etc., complete for
finished item of work. (APSS NO. 309 & 310)

60 Conveyance of excavated earth up to 5.00km lead


113.00 Cum including loading unloading & Conveyance charges 180.10 Cum
etc.
(V) Junction Improvements
61 Cutting open BT road surface (as well as asphalt
concrete upto 75 mm thick ) including water bound
3.39 cum macadam and stacking of excavated materials for 1183.87 cum
pipe line trench work. as directed by the
departmental officers.
62 BLD-CSTN-2-1 (9): Earth work excavation in Ordinary
Soil by Manual Means-Upto 3 m depth for foundations
and depositing on bank for all lifts and with an initial
lead of 10m including all operational, incidental,
11.19 cum labour charges such as shoring ,sheeting, planking, 210.92 cum
strutting, etc. complete for finished item of work
excluding dewatering charges etc as per SS - 20 B
(APSS 308).

63 BLD-CSTN-3-5 (22) - Plain Cement concrete nominal


mix (1:4:8) prop (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine
Crushed Metal including cost and conveyance of all
materials like cement, sand, coarse aggregate water
etc., to site , labour charges , for mixing , laying,
2.03 cum concrete , ramming in 15 cm layers, finishing top 4252.08 cum
surface to the required level curing etc., complete for
finished item of work.for foundation and under
flooring bed.

64 BLD-CSTN-6-12-(67) : Construction of RR Masonary


in Cement Mortor ( 1:6 ) Prop using hard granite
stone including cost & Conveyance of all materials like
Cement, Sand , Water, Granite Stones, labour
9.16 cum charges for cutting Stones to required size and 3906.50 cum
shape, mixing of Cement Mortor ,Construction,
Scaffolding Charges curing etc., complete for finished
item of Work .

65 BLD-CSTN-6-6-(61) : Construction of CRS Masonary


1st Sort in Cement Mortor ( 1:6 ) Prop using hard
granite stone including cost & Conveyance of all
materials like Cement, Sand , Water, Granite
13.73 cum Stones, ,labour charges for cutting Stones to 4605.86 cum
required size and shape, mixing of Cement Mortor,
Construction, Scaffolding Charges curing etc.,
complete for finished item of Work .

66 Vibrated reinforced cement concrete M 20 grade


using 20mm graded HBG crushed stone aggregate
(Coarse aggregate conforming to table 1000-1 and
fine aggregate conforming to table 1000-2) including
cost, conveyance of all materials to site and labour
charges, centering, machine mixing, laying, vibrating,
curing etc., including other incidental hire and
operational charges of all T&P as per approved
0.85 Cum drawings and as directed during execution but 5248.25 Cum
excluding cost of steel and its fabrication charges for
finished item as per MoRT&H specification
1500,1600,1700 & 2200 (5th revision ) and as
directed by the Engineer-in-Charge for Bed blocks &
Backing walls (Sub-structure)
67 BLD-CSTN-2-8 (16) : Filling with gravel with initial
lead in layers not exceeding 15 cm thick,
consolidating each deposited layer by watering and
ramming including cost and conveyance of water to
16.33 Cum work site and all operational, incidental, labour 198.38 Cum
charges, hire charges of T & P etc., complete for
finished item of work. (APSS NO. 309 & 310)

68 BLD-CSTN-2-8 (16) : Filling with red earth in


central divider portion with initial lead in layers not
exceeding 15 cm thick, consolidating each deposited
layer by watering and ramming including cost and
20.42 Cum conveyance of water to work site and all operational, 653.68 Cum
incidental, labour charges, hire charges of T & P etc.,
complete for finished item of work. (APSS NO. 309 &
310)

69 RBR-HRTC-5 ; Turfing lawns with fine grassing


including ploughing, dressing including breaking of
clods, removal of rubbish, dressing and supplying
86.48 sqm doobs grass roots at 10 cm apart, including supplying 37.60 sqm
and spreading of farm yard manure at rate of 0.6
cum per 100 sqm - as per Specification 307 MORTH

70 RBR-HRTC-8 : Planting flowering plants and shrubs in


33.91 Rmt central verge as per Specification 307 MORTH 124.94 Rmt

(VI) Providing footpaths


71 RBR-FNDN-1 -manual means : Earthwork excavation
for structures in all types of soil as per drawing and
technical specifications including setting out,
construction of shoring and bracing, removal of
1240.00 Cum stumps and other deleterious material and disposal 210.92 Cum
upto a lead of 50 m, dressing of sides and bottom
and backfilling in trenches with excavated suitable
material as per Technical Specification 305 MORD /
304 MORTH.

72 BLD-CSTN-3-5 (22) - Plain Cement concrete nominal


mix (1:4:8) prop (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine
Crushed Metal including cost and conveyance of all
materials like cement, sand, coarse aggregate water
608.84 Cum etc., to site , charges on all materials, labour 4252.08 Cum
charges , for mixing , laying, concrete , ramming in
15 cm layers, finishing top surface to the required
level curing etc., complete for finished item of work.
73 RBR-CCPV-13 - ii: Providing and Laying of
Interlocking Concrete Block Pavements using precast
concrete blocks for paving of M-30 grade and
thickness not less than 50 mm for Non traffic areas
5615.96 Sqm conforming to IS 15658:2006 in all shapes and 570.70 Sqm
designs as per the manufacturer's Specification
including cost and conveyance of all material and all
labour charges etc,. complete.

74 RBR-TSRA-29 : Cast in Situ Cement Concrete M20


Kerb: Construction of cement concrete kerb with top
and bottom width 115 and 165 mm respectively, 250
mm high in M 20 grade PCC on M-10 grade
6200.00 rmt foundation 150 mm thick, foundation having 50 mm 286.24 rmt
projection beyond kerb stone, kerb stone laid with
kerb laying machine, foundation concrete laid
manually, all complete as per clause 408 MORTH

75 BLD-CSTN-8-2-(77) : Plastering with 12mm thick in


single coat in CM (1:4) finished smooth including cost
and conveyance of all materials to site, charges on
all materials, finishing, curing, scaffolding and all
2790.00 Sqm operational, incidental, labour charges etc., including 150.75 Sqm
cutting grooves where ever necessary etc., complete
for finished item of work. (As per SS 903).

76 Painting to M20 kerb walls with 2 - coats of ready


mixed first quality synthetic enamel paint ( ready
mixed Synthetic Enamel paints in all shades Grade - II
having VOC (Volatile Organic Compound ) content
2790.00 Sqm less than 50 grams/ Lit.) of approved brand and 112.35 Sqm
shade over an existing steel primer, including cost
and conveyance of all materials to work site and all
operational, incidental, labour charges etc., complete
- BLD-CSTN-10-12-v

77 RBR-HRTC-9: Planting of trees by the road side


(Avenue trees) in 0.60 m dia holes, 1 m deep dug in
the ground, mixing the soil with decayed farm
yard/sludge manure, planting the saplings, backfilling
310.00 Each 1550.80 Each
the trench, watering, fixing the tree guard and
maintaining the plants for one year- as per
Specification 307 MORTH

78 Providing and fixing MS iron tree guard 60 cm dia and


2 metre high above ground level formed of 4 Nos (25
x 6 mm) and 8 Nos (25 x 3 mm) vertical MS riveted to
3 Nos (25 x 6 mm) iron rings in two halves, bolted
310.00 No.s together with 8 mm dia and 30 mm long bolts 2037.17 each
including painting two coats with paint of approved
brand over a coat of priming, complete in all respects.

Sub Total (A)


Provisions
79 provision for GST @ 12.00%
80 Provision towards NAC @ 0.10%
81 Add Labour Cess @ 1.00%
82 Provision towards QC @ 0.50%
83 Provision towards seiniorage charges @ 0.50%
84 Provision for A & S Charges @ 2.00%
85 Provision for Guarantee Commission @ 2.00%
86 Provision towards TUFIDC service charges @ 0.10%
Sub-Total. B
Provision towards Consultancy charges for Preparation of DPRs includingSub Total ( A ) +( B )
87 18% GST 0.69%
88 Provision towards Shifting of Electirc poles
89 L.S for Unforseen items
Sub-Total.C
Total Project Cost ( A+B+C )
Say
SCHEDULE - 'A'
OF QUANTITIES - ( PART - I )

ntral Lighting under TUFIDC Assistance in Kodada Municipality

Amount

2,206,667.05

1459435.50

939306.15

13106131.27

22109635.15
1171278.95

439112.95

22437682.26

15202737.61

283683.40
122581.43

10544.00

25400.16

88996.03
459323.28

1041723.24
269350.92

1285701.52
12761.28

62801.77

13835.22

547258.74

161988.00
22296.00

62260.00
24018.00

45200.00
20676.00

184920.00
1801200.00

3580022.88

119591.64

4463632.52
19750143.23

4200547.68

355320.00

1180683.00

7631120.66

2288070.16
2848784.50

13549352.80

806121.20
149238.80

1759349.64

411492.20

199962.40

429938.87
1891021.20

551667.80

87273.44

197193.08

42506.40

161922.32

18085.12

31918.66

777216.83
697341.12

2825993.88

48801.48

20351.30

4013.32
2360.19

8631.72

35767.91

63256.88

4450.51
3239.55

13348.15

3251.65

4236.97

261540.80

2588836.39
3205028.37

1774688.00

420592.50

313456.50

480748.00

631522.70

166512140.80

19981457.00
166512.00
1665121.00
832561.00
832561.00
3330243.00
3330243.00
166512.00
30305210.00
196817350.80
1355742.00
500000.00
426907.20
2282649.2
199100000.00
1991.00 Lakhs
Page 153 of 2191 General Abstract

Kodada Municipality
Development of Roads and Providing Central Lighting under TUFIDC Assistance in
Kodada Municipality

GENERAL ABSTRACT
S.No Description of Items Quantity Amount in Rs.
1 Laying of BT Roads, at various localities 8530 Rmt 85618505.88

2 Construction of Median with CC including greenary at various 9450 Rmt 33649940.95


localities
3 Providing Central lighting with LED at various roads 398 Nos 33023100.59

4 Widening of Existing BT Road with CC Road on Both Sides in 1640 Rmt 4401623.27
Kattakommu Gudem Road
5 Junction improvements at Khammam cross road and Rajiv 2 Nos 142556.85
chowk
6 Providing Footpaths in various roads 3100 Rmt 9676413.26

Sub-Total. A Rs. 166512140.80

7 provision for GST @ 12% 19981457.00

8 Provision towards NAC @ 0.10% 166512.00

9 Add Labour Cess @ 1.00% 1665121.00

10 Provision towards QC @ 0.50% 832561.00

11 Provision towards seiniorage charges @ 0.50% 832561.00

12 Provision for A & S Charges @ 2.0% 3330243.00

13 Provision for Guarantee Commission @ 2.0% 3330243.00

14 Provision towards TUFIDC service charges @ 0.10% 166512.00

Sub-Total. B Rs. 30305210.00

Sub Total ( A ) +( B ) 196817350.80

15 Provision towards Consultancy charges for Preparation of DPRs 0.69% 1355742.00


including 18% GST

16 Provision towards Shifting of Electirc poles 500000.00

17 L.S for Unforseen items


426907.20
Sub-Total.C Rs. 2282649.20

Total Project Cost ( A+B+C ) Rs. 199100000.00


Say Rs. 1991.00 Lakhs
Page 154 of 2191 General Abstract

The govt. Vide Go.MS. No-495 Dept, Dt: 25.06.2018 of MA & UD Department have accorded
permission to TUFIDC for an amount of Rs.2500.00 lakhs to Kodad Municipality for taken up
1 infrastructure development works with funding pattern from TUFIDC grants as per the guide
lines in GO.MS.No51 MA & UD Dept. Dt:13.03.2018.

2 the DistrictCollector & magistrate Suryapet vide Proceeding No.MCK/E1/224/2017-18 have


accorded administrative sanction for phase-i works for an amount of Rs. 2500.00 lakhs . In this
annexure of the proceeding at Sno. 01 an amount of Rs. 1991.00 lakhs is proposed for the
work of "Development of roads & central lighting in kodad Municipality".

3 Revised Technical Sanction is accorded for the above work for an aamount of Rs. 1991.00
Lakhs and registered under ENC (PH) R.No:94/2018-19; Dt 5/10/2018 in supercession of
TS.No.ENC.R.No.75/2018-19; dt 18.08.2018.

Sd/-
Engineer-in-Chief(P.H)
//ATTESTED//

Executive Engineer(P.H)
BT road 9
1 GSB 10106.8 Cum GSB/WMM 21678.8 14453
2 WMM 11572 Cum
3 DMB 3446 Cum DMB/BC 5275 3517
4 BC 1829 Cum
Central Divider
M20 4408 Cum PCC M15 grade and above 4408 2939
Lighting
No of poles 398 Nos No of poles 398 265
LED/ 398 Nos Lights 398 265

Finacial 166216311.53 110810874

Solvency 166216311.53 55405437.177

M20 AND ABOVE 5088.4 5088.4 3392


9
10106.83 GSB/WMM 21678.92 14453
11572.09
3448.92 DMB/BC 5278.01 3519
1829.09

4408.43 PCC M15 gr 4408.425 2939

398.00 No of poles 398 265


Lights 0 0

1108.109 166216311.53 1.11E+08 1108.109

166216311.53 55405437

0 0
1.BT roads

KODADA MUNICIPALITY
1) NAME OF WORK : DEVELOPMENT OF BT ROADS UNDER TUFIDC ASSISTANCE IN KODADA MUNICIPALITY
BILL OF QUANTITIES
ESTIMATE AMOUNT Rs.
Sl
Description of item Quantity Rate Per
No
1 2 3 4 5
1 Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket
capacity including cutting and loading in tippers, trimming bottom and side
slopes, in accordance with requirements of lines, grades and cross-sections,
and transporting to the embankment location with all lifts and lead upto 1000
m as per Technical Specification Clause 302.3 MORD / 301 MORTH

26077.37 Cum 84.62 1 Cum


2 Loosening of the ground upto a level of 300 mm below the subgrade level,
watered, graded and compacted in layers to meet requirement of Tables
300.1 and 300.2 for subgrade construction as per Technical Specification
Clause 303.5.2 MORD / 305 MORTH. RBR-EECD-16

13999.38 Cum 104.25 1 Cum

3 Conveyance of excavated earth up to 5.00 km including loading, unloading


5215.47 Cum 180.10 1 Cum
and conveyance ,etc, complete.

4 Construction of granular sub-base by providing coarse graded material


grade-III , spreading in uniform layers with motor grader on prepared
surface, mixing by mix in place method with rotavator at OMC, and
compacting with vibratory roller to achieve the desired density, complete as
per clause 401 MORTH.

9541.03 Cum 1373.66 1 Cum


Page 157 of 2191
1.BT roads

Sl
Description of item Quantity Rate Per
No
1 2 3 4 5
5 Providing, laying, spreading and compacting graded stone aggregate to wet
mix macadam specification including premixing the material with water at
OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to
site, laying in uniform layers in sub-base/base course on a well prepared
sub-base and compacting with smooth wheel roller of 80 to 100kN /
Vibratory Roller 80-100 kN weight to achieve the desired density including
lighting, barricading and maintenance of diversion, etc as per Tables 400.11
& 400.12 and Technical Specification Clause 406 MORD / MORTH.

11572.09 Cum 1910.60 1 Cum

6 Providing and applying primer coat with bitumen emulsion (SS2) on


prepared surface of granular Base including clearing of road surface and
spraying primer at the rate of 0.60 kg/sqm using mechanical means as per
Tech. specification No 502 MORTH.

46664.50 Sqm 25.10 1 Sqm

7 Providing and applying tack coat with bitumen emulsion (RS-1)using


emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared
bituminous/granular surface cleaned with mechanical broom as per Tech.
specification No 503 MORTH

46664.50 Sqm 9.41 1 Sqm

Page 158 of 2191


1.BT roads

Sl
Description of item Quantity Rate Per
No
1 2 3 4 5
8 Providing and laying bituminous macadam with 100-120 TPH / 40-60 TPH
hot mix plant producing an average output of 75 tonnes/ 37.50 t per hour
using crushed aggregates of specified grading premixed with bituminous
binder 3.3% , transported to site, laid over a previously prepared surface
with paver finisher to the required grade, level and alignment and rolled as
per clauses 501.6 and 501.7 to achieve the desired compaction as per Tech.
specification No. 504 MORTH.

3448.92 Cum 6505.71 1 Cum

Page 159 of 2191


1.BT roads

Sl
Description of item Quantity Rate Per
No
1 2 3 4 5
9 Providing and laying bituminous concrete with 100-120 TPH batch type hot
mix plant producing an average output of 75 tonnes per hour using crushed
aggregates of specified grading, premixed with bituminous binder @ 5.4 to
5.6 per cent of mix and filler, transporting the hot mix to work site, laying
with a hydrostatic paver finisher with sensor control to the required grade,
level and alignment, rolling with smooth wheeled, vibratory and tandem
rollers to achieve the desired compaction as per MORTH specification
clause No. 509 complete

1829.09 Cum 8311.64 1 Cum

10 Providing and filling with gravel brought from out side and labouur charges
for filling and spreading in layers of not more than 150mm thick each or as
directed by engineer-in-charge during execution, watering, compacting each
layer, labour charges for all operations, all water leads etc complete.

1430.00 Cum 198.38 1 Cum


Sub Total (A) Rs.

Page 160 of 2191


1.BT roads

Sl
Description of item Quantity Rate Per
No
1 2 3 4 5
Name of Work: Construction of Box Culverts at Various places in
Kodad Municipality
11 RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by
Manual means: Earthwork excavation in all kinds of soil for Pipe line
trenches as per drawings and technical specifications including setting out,
construction of shoring and bracing, removal of stumps and other
deleterious material , dressing of sides and bottom as per Technical
Specification 305 MoRD / 304 MoRTH and as directed by the departmental
officer including protecting the existing utility services wherever it is possible
during the execution and taking all precautionary measures in the restricted
areas for laying sewer/water pipe lines including divertion of traffic and
backfilling in trenches with excavated suitable material and disposal of
remaining earth upto a lead of 50 m, including all incidental and operational
charges etc., complete by manual means.

581.18 cum 210.92 1 cum


12 Dewatering pipe line trenches etc, duly bailing out water from the pipe line
trenches with oil engine driven pumpsets, including hire charges, fuel
charges and wages for Driver and Helper and all other incidental and
operational charges including suction and delivery hose, lead of drain in to
natural drain etc, complete.

200.00 Hphr 52.72 1 Hphr


13 BLD-CSTN-2-8 (16): Collection, Supply and filling with HBG stone chips
2.36 mm & below from approved quarry to work site and stacking at work
site to Dept. gauge for premeasurements including cost and convenyance
of all material and all labour charges etc. complete as per standard
specifications. Clause 305.3.9 MORD & 304 MORTH

Page 161 of 2191


1.BT roads

Sl
Description of item Quantity Rate Per
No
1 2 3 4 5
27.90 cum 910.40 1 cum
14 BLD-CSTN-3-5 (22) : Plain Cement concrete nominal mix (1:4:8) prop
(Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite
Machine Crushed Metal including cost and conveyance of all materials like
cement, sand, coarse aggregate water etc., to site, labour charges , for
mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to
the required level curing etc., complete for finished item of work.for
foundation and under flooring bed.

20.93 cum 4252.08 1 cum


15 BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix
Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size
graded machine crushed hard granite metal (coarse aggregate) from
approved quarry including cost and conveyance of all materials like cement,
fine aggregate (sand) coarse aggregate, water etc., to site including all
operational, incidental and labour charges such as weigh batching, machine
mixing, laying concrete, vibrating, curing, centering and suttering charges
etc.,complete but excluding seignorage charges, cost of steel and its
fabrication charges for finished item of work (APSS No. 402) with minimum
cement content as per IS code-Base slab.

base slab 60.40 cum 7604.69 1 cum

Page 162 of 2191


1.BT roads

Sl
Description of item Quantity Rate Per
No
1 2 3 4 5
16 BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix
Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size
graded machine crushed hard granite metal (coarse aggregate) from
approved quarry including cost and conveyance of all materials like cement,
fine aggregate (sand) coarse aggregate, water etc., to site including all
operational, incidental and labour charges such as weigh batching, machine
mixing, laying concrete, vibrating, curing, centering and suttering charges
etc.,complete but excluding seignorage charges, cost of steel and its
fabrication charges for finished item of work (APSS No. 402) with minimum
cement content as per IS code.

Page 163 of 2191


1.BT roads

Sl
Description of item Quantity Rate Per
No
1 2 3 4 5
a Side wall 90.72 cum 11482.84 1 cum
b Top slab 400mm thick 36.00 cum 7481.97 1 cum
17 BLD-CSTN-4-1-(34) : Providing High Yield Strength Deformed (HYSD)/
Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 500
grade as per IS 1786-1979) of different diameters for RCC works , including
labour charges for straightening, cutting, bending to required sizes and
shapes, placing in position with cover blocks of approved materials and size
and tying and lap-splicing with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and drawings, including cost
and conveyance of steel bars, including all wastages such as overlaps,
couplings, chairs, spacer bars including cost and conveyance of binding
wire, cover blocks and all incidental, operational, labour charges such as
cutting, bending, placing in position, tying complete for finished item of work
in all floors.( APSS No.126

18712.00 kg 68.71 1 kg
18 Supplying and fixing of 110mm dia PVC pipes for weep holes including
material, labour charges like cutting size, fixing in side wall etc as directed
by Engineer- in- charge
48.00 mts 265.86 1 mt
19 Carting of surplus excavated rock/Soil within a lead of 5Km from the site to a
distance suitable including loading charges, cost & conveyance, dumping,
labour charges and other incidental and operational charges etc., complete.

348.71 cum 180.10 1 cum

Page 164 of 2191


1.BT roads

Sl
Description of item Quantity Rate Per
No
1 2 3 4 5
20 BLD-CSTN-2-8 (16) : Filling with gravel with initial lead in layers not
exceeding 15 cm thick, consolidating each deposited layer by watering and
ramming including cost and conveyance of water to work site and all
operational, incidental, labour charges, hire charges of T & P etc., complete
for finished item of work. (APSS NO. 309 & 310)

69.74 cum 198.38 1 cum


Sub Total (B) Rs.

Page 165 of 2191


1.BT roads

Sl
Description of item Quantity Rate Per
No
1 2 3 4 5

Name of Work : Providing Traffic sign, Marking & Other Appurenances for
B.T Roads at Various locations in Kodada Municipality
21 Pavement markings with hot applied thermoplastic material complete as per
drawing and Technical Specifications clause 803.
a) Lane / Centre line / Edge marking / and Pedestrian passage / Arrows all
819.36 Sqm 667.91 1 Sqm
other road marking etc.

22
Supplying and fixing sign boards complete as per Technical Specifications
clause 801 and as directed by engineer, including the cost of posts, fixtures,
foundation, fitting & fixing. Sheeting will be retro-reflective tyupe of high
intensity grade and messages/borders will be screen printed.

a) Informatory signs size: As per R&B approved rates

Page 166 of 2191


1.BT roads

Sl
Description of item Quantity Rate Per
No
1 2 3 4 5

Providing and fixing junction boards of size 1500x1200mm madeout of


type XI of ASTMD 4956-09 wide angle cube cornered micro Prismatic Retro
reflective sheeting and confiriming to IRC 67:2012 for full backround of
Green colour & white Letters and fixed over 4MM Alluminium Composite
Material sheet having minimum 0.5 mm thick Aluminium skin on both sides
with back side painted grey colour and fixed over back support frame of M.S
angle 25X2X3mm all round and fixing with 5x35x4mm and mounted on a
MS angle post of size 75x75x6mm with clear height of not less than 2.1 m
6.00 each 26,998.00 1 each
from the ground level to the bottom of the board. the signpost should be
painted with one coat of red oxide paint and 2 coats of synthetic enamel
paint black and white colour with bands of 30cm of height . The signposts
shall be firmly fixed with MS base angle 35x35x4 mm in to the ground by M-
15 concrete foundation of size 450x450x600mm including cost and
conveyance of alla materials, equipment, machinery and labour with all
leads and lift , loading charges necessary for satisfactory completion of the
work as directed by Engineer-in-charge.

Page 167 of 2191


1.BT roads

Sl
Description of item Quantity Rate Per
No
1 2 3 4 5

Providing and fixing Village/town name board size 600x800 mm


made out of Type – XI of ASTMD 4956-09 wide angle cube cornered micro
Prismatic Retro reflective sheeting and confirming to IRC 67:2012 for full
background of Green Colour & White Letters and fixed over 3MM Alluminium
Composite Material sheet having minimum 0.30mm thick Aluminium skin on
both sides with back side painted grey colour and fixed over back support
frame of M.S angle 25x25x3mm all round and fixing with 35x35x4mm and
mounted on a MS angle post of size
75x75x6mm with clear height of not less than 2.1 m from the ground level 3.00 each 7,432.00 1 each
to the bottom of the board. The signpost should be painted with one coat of
red oxide paint and 2 coats of synthetic enamel paint Black and White colour
with bands of 30cm of height. The signpost shall be firmly fixed with MS
base angle 35x35x4 mm in to the ground by M-15 Concrete foundation of
size450x450x600mm including cost and conveyance of all materials
,equipment, machinery andlabour with all leads and lift, loading charges
necessary for satisfactory completion of the workas directed by Engineer –
in-Charge.

b) Cautionary signs

Page 168 of 2191


1.BT roads

Sl
Description of item Quantity Rate Per
No
1 2 3 4 5
Providing and fixing Cautionary / Warning sign boards size 900 mm
equilateral triangle made out of Type – XI of ASTMD 4956-09 wide angle
cube cornered micro Prismatic Retro reflective sheeting and confirming to
IRC 67:2012 for full background of White colour and letters/logos
done by screen printing in Black colour, boarders by screen printing in Red
colour and fixed over 4MM Aluminium Composite Material sheet having
minimum 0.5 mm thick Aluminium skin on both sides with back side painted
grey colour and fixed over back support frame of M.S angle 25x25x3mm all
round and fixing with 35x35x4mm and mounted on a MS angle post of size
75x75x6mm with clear height of not less than 2.1 m from the ground level 10.00 each 6,226.00 1 each
to the bottom of the board. The signpost should be painted with one coat of
red oxide paint and 2 coats of synthetic enamel paint Black and White colour
with bands of 30cm of height. The signpost shall be firmly fixed with MS
base angle 35x35x4 mm in to the ground by M-15 Concrete foundation of
size 450x450x600mm including cost and conveyance of all materials
,equipment, machinery and labour with all leads and lift, loading chages
necessary for satisfactory completion of the work as directed by Engineer
-in-Charge.

Page 169 of 2191


1.BT roads

Sl
Description of item Quantity Rate Per
No
1 2 3 4 5
Supplying and installation of Hazard Marker using M.S. angle of size
55x55x6mm and 120cm high above ground level painted with two coats of
black & white stripes of 15cm wide with firstquality synthetic enamel paint
over one coat of appropriate primer of approvedbrand,colour, with 30cm x
90cm Type – XI of ASTMD 4956-09 wide angle cube cornered micro
Prismatic Retro reflective sheeting of Yellow colour and confirming to IRC
67:2012 fixed over 3MM Alluminium Composite Material having minimum
0.30 mm thick Aluminium skin on both sides with standard supports
consisting of alternately black and Yellow with black stripes in screen
printing sloping downward at an angle of 45 degrees towards the side of the 6.00 each 4,003.00 1 each
obstruction onwhich the traffic is to pass and buried into the ground in a
trench of size 30cm x 30cm and 50cm depth filled with CC M-20 including
cost and conveyance of all materials, equipment, machinery and labour with
all leads and lifts, loading and un-loading charges necessary for successfull
completion of the work on any road in division as directed by Engineer-in-
Charge andconforming to IRC 67-2012 &MORT&H specification No.805 and
approved drawings etc., complete for finished item of work.

Page 170 of 2191


1.BT roads

Sl
Description of item Quantity Rate Per
No
1 2 3 4 5
Supply and Application of Alluminium Backed flexible prismatic sheeting
(AFP) which shall be of 1ft width Sq ft) and laminated at the back with a 50
micron thick Aluminum (Al) foil with pressure sensitive adhesive and liner.
Further, this flexible prismatic sheeting shall have screen printed arrow/slant
line pattern in black color on top in a continuous roll format. Neither AFP
sheeting nor the flexible prismatic sheeting used in it shall crack when slowly
bent in 1 second time around a 1/8th inch mandrel after being conditioned
for 24hrs at 0°C and tested as per section S2.2.2. of ASTM D 4956-09. The
AFP sheeting, with the liner removed, shall be applied with aneoprene 100.00 Sft 452.00 1 Sft
contact adhesive with Polychloroprene as base, viscosity of 200-450 cps and
solid content of 20-30%. Once applied, the edges of the product shall be
sealed all around with a two-part epoxy based structural adhesive and shall
be extremely resistant to peel-off. A test report from institutes like
ARAI/CRRI confirming to above
mentioned flexibility and ASTM-D4956-09 Type-VI retro reflectivity
performance of the flexible prismatic sheeting used in AFP shall be
submitted by the tenderer during prequalification and supply of material.
c) Mandatory signs, size

Page 171 of 2191


1.BT roads

Sl
Description of item Quantity Rate Per
No
1 2 3 4 5
Providing and fixing Mandatory / Regulatory sign boards size 600 mm
circle made out of Type – XI of ASTMD 4956-09 wide angle cube cornered
micro Prismatic Retro reflective sheeting and confirming to IRC 67:2012 for
full background of White colour and letters/logos done by screen printing in
Black colour, boarders by screen printing in Red colour and fixed over 3MM
Alluminium Composite Material sheet having minimum 0.30mm thick
Aluminium skin on both sides with back side painted grey colour and fixed
over back support frame of M.S angle
25x25x3mm all round and fixing with 35x35x4mm and mounted on a MS
angle post of size 75x75x6mm with clear height of not less than 2.1 m from 4.00 each 5,169.00 1 each
the ground level to the bottom of the board. The signpost should be painted
with one coat of red oxide paint and 2 coats of synthetic enamel paint Black
and White colour with bands of 30cm of height. The signpost shall be firmly
fixed with MS base angle 35x35x4 mm in to the ground by M-15 Concrete
foundation of size450x450x600mm including cost and conveyance of all
materials ,equipment, machinery and labour with all leads and lift, loading
charges necessary for satisfactory completion of the work as directed by
Engineer -in-Charge.

Page 172 of 2191


1.BT roads

Sl
Description of item Quantity Rate Per
No
1 2 3 4 5
23 Supplying and installation of delineators (Roadway indicators) not less
than 800mm high above ground level. The delineator shall have a core
and shell construction which shall be made of tough, high impact resistant,
injection-molded, thermoplastic outer body. The inner core shall consist of
powder coated or painted Mild steel of minimum thickness 1.0mm. The
delineator should have top retro-reflective unit consisting of white color
micro prismatic non metallic retro-reflective sheeting of minimum exposed
area of 125 cm2 and bottom retroreflective unit consisting of red color micro 120.00 each 1,541.00 1 each
prismatic non metallic retro-reflective sheeting of minimum exposed area of
35 cm2 confirming to ASTM D4956 type XI standards. The delineators shall
be fixed to the ground by inserting the root of the delineator up to the
marked portion and by firm concrete filling as per the instructions by
engineer in-charge.

Page 173 of 2191


1.BT roads

Sl
Description of item Quantity Rate Per
No
1 2 3 4 5
24 Supplying & Fixing of Moulded Shanks Raised Pavement Markers made
of plastic body moulded from HIPS(HIImpact Polysterene) or ABS or ASA
( Acrylic Strene Acrylonitrite and reflective panels with micro prismatic lens
capable of providing total internal reflection of the light entering the lens
face and shall support a load of 13635 kg tested in accordance to ASTM D
4280 Type H and complying to Specifications of Category A ofMORTH
Circular No RW/NH/33023/10-97 – DO III Dt 11.06. 1997. The height and
width shall not exceed 20 mm and 130 mm with minimum reflective area of
13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. 5,700.00 each 316.00 1 each
The strength of detachment of the integrated cylindrical shanks, (of
diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm)
from the body is to be a minimum value of 700 Kgs. Fixing will be by drilling
holes on the road for the twin shanks to go inside, without nails and using
epoxy resin based adhesive as per manufacturer’s recommendation and
complete as directed by the engineer.

Sub Total (C) Rs.

Total (A+B+C) Rs.

Page 174 of 2191


1.BT roads

KODADA MUNICIPALITY
F BT ROADS UNDER TUFIDC ASSISTANCE IN KODADA MUNICIPALITY
BILL OF QUANTITIES
1033.98 Lakhs

Amount

2206667.05

1459435.50

939306.15

13106131.27
Page 175 of 2191
1.BT roads

Amount

22109635.15

1171278.95

439112.95

Page 176 of 2191


1.BT roads

Amount

22437682.26

Page 177 of 2191


1.BT roads

Amount

15202737.61

283683.40
79355670.29

Page 178 of 2191


1.BT roads

Amount

122581.43

10544.00

Page 179 of 2191


1.BT roads

Amount

6
25400.16

88996.03

459323.28

Page 180 of 2191


1.BT roads

Amount

Page 181 of 2191


1.BT roads

Amount

6
1041723.24
269350.92

1285701.52

12761.28

62801.77

Page 182 of 2191


1.BT roads

Amount

13835.22
3393018.85

Page 183 of 2191


1.BT roads

Amount

547,258.74

Page 184 of 2191


1.BT roads

Amount

161,988.00

Page 185 of 2191


1.BT roads

Amount

22,296.00

Page 186 of 2191


1.BT roads

Amount

62,260.00

Page 187 of 2191


1.BT roads

Amount

24,018.00

Page 188 of 2191


1.BT roads

Amount

45,200.00

Page 189 of 2191


1.BT roads

Amount

20,676.00

Page 190 of 2191


1.BT roads

Amount

184,920.00

Page 191 of 2191


1.BT roads

Amount

1,801,200.00

2869816.74

85618505.88

Page 192 of 2191


Page 195 of 2191 2.Dividers

Kodada Municipality
Constructing Divider in Various Roads in Kodada Municipality
DETAILED AND ABSTRACT ESTIMATE
S.no Description of Item Nos L B D Qty Rate Per
1 Suryapet bypass road (KLR avenue) to Vijyawada 5700.00 mts
bypass road
2 Khammam road in kodad town.From khammam 1000.00 mts
cross road to RTA office.
3 Mellacheruvu road kodad town.From khammam 1500.00 mts
cross road to vijyawada bypass.

4 Huzurnagar road in kodad town.From Rajiv chowk 1500.00 mts


to vijyawada bypass.

Dedcutions for U-turns and near junctions 1 x 1 -250.00


Earth work 1 x 1 9450.00 1.60 0.050
PCC (1:3:6)prop 1 x 1
Central Dividers for CC Roads
1 Cutting open BT road surface (as well as asphalt
concrete upto 75 mm thick ) including water bound
macadam and stacking of excavated materials for
pipe line trench work. as directed by the
departmental officers.
1 x 2 9450.0 1.60 0.100 3024.0
3024.0 cum 1183.87 1 cum
2 BLD-CSTN-2-1 (9): Earth work excavation in
Ordinary Soil by Manual Means-Upto 3 m depth for
foundations and depositing on bank for all lifts and
with an initial lead of 10m including all operational,
incidental, labour charges such as shoring
,sheeting, planking, strutting, etc. complete for
finished item of work including seigniorage
excluding dewatering charges etc as per SS - 20 B
(APSS 308).
Page 196 of 2191 2.Dividers

S.no Description of Item Nos L B D Qty Rate Per


by Manual 1 x 2 9450.0 0.60 0.050 567.0
567.0 cum 210.92 1 cum
3 BLD-CSTN-3-5 (22) -Using Concrete mixture all
works up to Plinth Level: Plain Cement concrete
nominal mix (1:4:8) prop (Cement : fine
aggregate: coarse aggregate ) using 20mm size
Hard Granite Machine Crushed Metal including cost
and conveyance of all materials like cement, sand,
coarse aggregate water etc., to site , seigniorage
charges on all materials, labour charges , for
mixing , laying, concrete , ramming in 15 cm
layers, finishing top surface to the required level
curing etc., complete for finished item of work.for
foundation and under flooring bed.

1 x 2 0.00 0.45 0.0 cum 4252.08 1 cum


4 BLD-CSTN-3-11-(28) Plain Cement concrete M20
grade nominal mix(Cement : fine aggregate:
coarse aggregate ) using 20mm size Hard Granite
Machine Crushed Graded Metal including cost and
conveyance of all materials like cement, sand,
coarse aggregate water etc., to site , labour
charges , for mixing , laying, concrete , ramming in
15 cm layers, finishing top surface to the required
level curing etc., complete for finished item of work
with nomonal reinforcement for base

Below GL- for base slab 1 x 2 9450.00 0.30 0.150 850.5


850.5 cum 5248.25 1 Cum
Page 197 of 2191 2.Dividers

S.no Description of Item Nos L B D Qty Rate Per


5 BLD-CSTN-3-11-(28) Using Concrete mixture up to
Plinth Level : Plain Cement concrete M20 grade
nominal mix(Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine
Crushed Graded Metal including cost and
conveyance of all materials like cement, sand,
coarse aggregate water etc., to site , labour
charges , for mixing , laying, concrete , ramming in
15 cm layers, finishing top surface to the required
level curing etc., complete for finished item of work
with nomonal reinforcement for side wall

above G.L 300mm thick 1 x 2 9450.00 0.30 0.230 1304.1

above G.L 300mm thick to 230mm thick 1 x 2 9450.00 0.27 0.450 2253.8

3557.9 cum 5551.03 1 cum


6 BLD-CSTN-2-8 (16) : Filling with red earth in
central divider portion with initial lead in layers not
exceeding 15 cm thick, consolidating each
deposited layer by watering and ramming including
cost and conveyance of water to work site and all
operational, incidental, labour charges, hire
charges of T & P etc., complete for finished item of
work. (APSS NO. 309 & 310)

Inside devider portion 1x 1 9450.00 1.00 0.68 6426.0


6426.0 Cum 653.68 1 Cum
7 RBR-HRTC-5 ; Turfing lawns with fine grassing
including ploughing, dressing including breaking of
clods, removal of rubbish, dressing and supplying
doobs grass roots at 10 cm apart, including
supplying and spreading of farm yard manure at
rate of 0.6 cum per 100 sqm - as per Specification
307 MORTH
Page 198 of 2191 2.Dividers

S.no Description of Item Nos L B D Qty Rate Per


1x 1 9450.00 1.00 9450.0
9450.0 sqm 37.60 1 sqm
8 RBR-HRTC-8 : Planting flowering plants and shrubs
in central verge as per Specification 307 MORTH

1x 1 9450.00 9450.0
9450.0 Rmt 124.94 1 Rmt
TOTAL Rs:
Page 199 of 2191 2.Dividers

Kodada Municipality
vider in Various Roads in Kodada Municipality
AILED AND ABSTRACT ESTIMATE
Amount

3580022.88
Page 200 of 2191 2.Dividers

Amount

119591.64

0.00

4463632.52
Page 201 of 2191 2.Dividers

Amount

19750143.23

4200547.68
Page 202 of 2191 2.Dividers

Amount

355320.00

1180683.00
33649940.95
336.50 Lakhs
Page 203 of 2191 3.central lighting

KODAD MUNICIPALITY

Name of the Work::Providing Double Arm Central Lighting at various places in Kodad Municipality

DETAILED AND ABSTRACT ESTIMATE


Sl.No SSR No Description of Item Qty Rate per Amount
Total Length = 8760 rmts 398.00 Nos

1 ELEC-7.2.1 (b) Fabrication, Transportation and supply of hot-dip galvanized Octogonal Pole with
BSEN - 10025 grade S 355 JO steel plate for shaft, IS 2062 for base plate with door
opening arrangement, including the supply of suitable boards with bakelite sheet and
MCB's as per IS specification suitable to withstand the wind speed of 180 KMPH for 9
Mtrs height Pole having dimensions Bottom 155mm, Top 70mm with 3mm thick, base
plate 260 x 260 x 16mm and 4 Nos of M24 x 750mm long 'J' bolts along with
template. Makes: BAJAJ / VALMONT / TRANSRAIL / SKIPPER / UTKARSH /
LAASMA

398.00 19173.67 No.s 7631120.66


2 ELEC-7.3.2(d) Fabrication, Transportation and supply of MS galvanized 50mm dia Pipe 1.5 Mtr
sword type or any decorative double arm bracket with dooms etc complete with all
accessories
398.00 5748.92 No.s 2288070.16
3 ELEC-7.10.3 Foundation and erection charges with special T&P, for 9.00Mtrs / 10Mtrs long Octagonal /
Conical pole duly erecting on base plate duly providing 4 Nos foundation bolts with nuts with
providing of 0.60Mtrx0.60Mtrsx1.40 Mtr size M20 cc work vibrated concreting mixing with
necessary steel (15kgs) reinforcement as directed by the field engineers during execution
including all labour charges and cost and conveyance of materials etc. complete. as directed by
the field engineers during execution including all labour charges and cost and conveyance of
materials etc. complete.

398.00 7157.75 No.s 2848784.50


Page 204 of 2191 3.central lighting

Sl.No SSR No Description of Item Qty Rate per Amount


4 ELEC-3.11.1(k) Supply and transportation of 150Watts LED Street light Body made of high grade pressure die
– cast Aluminium alloy with corrosion resistant powder coat, having protective toughened glass
cover, Less Glare, IP 66 (Silicon gasket sures Optical & Electrical compartments are IP 66)
protected, wide operating voltage range, P.F > 0.90, System having efficacy >100 lumens/watt,
with Ingress protection IP66, Driver surge protection more than 4KV, THD<15%, CCT: 3000-
6500K as desired by the department and as per IS, CRI>80, Inbuilt Electrical protections like
Over voltage, short circuit, Over load, Open Circuit, Miswiring, etc complete with 5 years
warranty. LUMINAIRE MAKE : PHILIPS / OSRAM / GE / CROMPTON / BAJAJ / SCHREDER /
VIN / HALONIX / HAVELLS / HPL / SURYA / SYSKA. LED MAKE : PHILIPS LUMILEDS / CREE
/ NICHIA / OSRAM / SAMSUNG / LG LEDs.

796.00 17021.80 No.s 13549352.80

5 ELEC-7.5.2 b Supply and fixing of suitable out door feeder piller box of size made with 14 SWG CRCA sheet
with double door arrangement, making powder coating after processing of 7 Tank process, lock
and key,hinges, rubber gasket, danger board,suitable angle iron stand for mounting the feeder
pillar with cement concrete, including Supply and fixing of Legrand / Schnieder make as out
goings, indication lamps, din channel, 6 Sqmm 3 core copper cable for invidual light control,
connectors, gland plates and provision for 3 phase energy meter etc., complete for finished item
of work and suitable wiring provision for connecting the nature switch with following.(63A, 4 Pole
isolator as incomer, 6 Nos 6-32A SP MCBs)

40.00 20153.03 No.s 806121.20

6 Std DATA 5.1.1 Providing independent earthling by excavating a trench to a depth of 2.1 M in all soils,
as per size specified in the Data, using 40mm dia 'B' class GI pipe of 2.5 Mtrs length
with necessary accessories with hume pipe ring duly providing staggered holes
including filling with equal proportion of Salt and Charcoal in layers and all labour
charges etc., complete for small quarters. for each piller
box
40.00 3730.97 No.s 149238.80
7 ELEC-4.8.1 (b) Supply and Transportation incluiding Earth work excavation and laying charges of
Outer dia 63mm and Inner dia 51mm double walled corrugated HDPE duct made as
per specification BSEN - 500 86/IS 14930 Part-II. Makes:DURA LINE (Dura Guard) or
its equivalent make.51mm dia DWC pipe

8760.00 200.84 rmt 1759349.64


Page 205 of 2191 3.central lighting

Sl.No SSR No Description of Item Qty Rate per Amount


8 ELEC-4.8.1 (a) Supply and Transportation of Outer dia 50 mm and Inner dia 38 mm double walled
corrugated HDPE duct made as per specification BSEN - 500 86/IS 14930 Part-II.
Makes:DURA LINE (Dura Guard) or its equivalent make.51mm dia DWC pipe
for each pole
10 mts
3980.00 103.39 rmt 411492.20

9 ELEC- 3.5.2(d) Supply and fixing of Automatic Street Light Control System with Optical Sensor, Low
volatage / High voltage trip and reset, operating voltage 380 - 450 V AC, 50 HZ with
suitable SMC enclousure of IP 54 protection, MCBs of Legrand / Schneider / L&T /
Siemens of 10KA C/D curve and Contactor suitable to control the load of 12KW three
phase load with necessary clamping arrangements. Makes : Swadeep Nature Switch /
Light Mate / L&T / Siemens / Bajaj.

10.00 19996.24 each 199,962.40

10 15.6.1 Supplying and erecting of 50Sq.mm 3 ½ core PVC armoured U.G cable 1100V grade with ISI
mark following strand/solid aluminium conductor by making trench in soil up to 0.9m deep
embedding the cable complete with sand bed of 20cm, thick layers and bricks placed on top of
the cable width wise all over the run and backfilling the excavated earth without stones and hard
materials and making the surface proper, 8 SWG GI wire including glands, lugs, including
crimping job, to be laid partly in trench, partly in ground with cable indicators at 8 Meter interval
etc, complete as directed by site In-Charge for service connections etc., complete. (Asian /
Universal / Paragon/ Finolex / Polycab / Powerflex) from feeder pillars to Meter box.and as per
the directions of the Engineer.

876.00 490.80 rmt 429938.87

11 ELEC-4.1.1 (F) Supply and laying of 16 Sqmm 4 Core XLPE insulated, 1100V grade armoured
alluminium cable as per specification confirming to IS:7098 (Part - I). Makes : Torrent /
Universal / Unicab / Polycab / Havells / Gloster / KEI or equivalent

8760.00 215.87 rmt 1891021.20

12 ELEC-1.5.6(b) Supply and laying of 4.0 Sqmm (56/0.3) 2 Core PVC Insulated, Flexible Armouring
Flexible Copper cable as per IS 7098 / Part-I / 1988 including all transportation
charges etc complete. Makes : Finolex / RR kabel / avells / Polycab / RPG / KEI /
Nakoda / Gemni / HPL / Gloster
Page 206 of 2191 3.central lighting

Sl.No SSR No Description of Item Qty Rate per Amount


3980.00 138.61 rmt 551667.80

13 ELEC-2.13.1 Supply and fixing of 6-32A 10KA SP MCB, C/D Curve ISI Mark. Makes : Legrand-DX3 /
(458(a)) Schneider-Acti9 / Siemens / L&T,Exora.

398.00 219.28 each 87273.44


14 ELEC-4.3.1 Supply and fixing of single compression brass cable glands for 3 1/2 core XLPE
(827,c) armoured cable up to 50Sq.mm with brass washers complete

796.00 247.73 each 197193.08

15 ELEC- 4.4.1 Supply and fixing of heavy duty long barrel copper lugs confirming to I.S
specifications suitable for 16 sqmm cable etc complete with nuts, bolts and washers.
Makes: DMI / Jainson / Dowels

796.00 53.40 each 42506.40


16 ELEC-4.3.1 Supply of single compression brass cable glands for 4 core XLPE armoured
(827,b) cable up to 16.0 Sq.mm with brass washers complete

796.00 203.42 each 161922.32

17 ELEC- 4.4.1 Supply of heavy duty long barrel copper lugs confirming to I.S specifications
suitable for 16 sqmm cable etc complete with nuts, bolts and washers. Makes:
DMI / Jainson / Dowels

up to 16 sqmm 796.00 22.72 each 18085.12


total: Rs. 33023100.59
207 of 2191 4.CC road

Widening of Existing CC Road with CC Road on Both Sides in Kattakommu Gudem Road under TUFIDC Assistance in Kod

Detail Cum Abstract Estimate


S. DESCRIPTION NOS. MEASUREMENTS QUANTITY
No. L B D

Kattakommu gudem road 1640.00 2.00


1640.00
Thickness of CC (1:4:8) prop 0.050
Expansion joint c/c 40.00
Thickness of M30 rich mix 0.150
Thickness odf Quarry dust 0.15
1 Removal of unsuitable / Unserviceable soil including excavation
by mechanical means, loading and disposal upto 1000 m lead
including compaction upto OMC, ground supporting
embankment subgrade replacement by suitable soil as per
Clause 303.5.2 as per Technical Specification Clause 302.3.11
MORD / 301 MORTH and directed by Engineer-in-Charge

Kattakommu gudem road 1 x 1 1640.0 2.30 0.100 377.20


377.20 Cum
2 Construction of granular sub-base by providing coarse graded
material grade-III , spreading in uniform layers with motor
grader on prepared surface, mixing by mix in place method with
rotavator at OMC, and compacting with vibratory roller to
achieve the desired density, complete as per clause 401 MORTH.

Kattakommu gudem road 1 x 1 1640 2.30 0.150 565.80


565.80 Cum
208 of 2191 4.CC road

3 Providing Plain Cement Concrete (1:4:8) mix using 20mm size


HBG crushed stone aggregate and fine aggregate conforming to
table 1000-2 of MoRT&H including cost, conveyance of all
materials to site and labour charges, centering, machine mixing,
laying, Vibrating, curing etc., including all other incidental and
operational charges of all T&P etc., complete for finished item of
work as per MoRT&H specification 1500, 1700, 2100 (5th
Revision) and as directed by the Engineer-in-Charge for base
coarse below CC Pavement.

Kattakommu gudem road 1 x 1 1640 2.00 0.050 164.00


164.00 Cum
4 Construction of plain cement concrete pavement 150mm
thickness as per design, over a prepared sub base, with 43 grade
cement or any other type as per Clause 1501.2.2 M30 (Grade),
coarse and fine aggregates conforming to IS : 383, maximum in
a concrete mixer of not less than 0.2 cum capacity and
appropeiate weigh batcher using approved mix design, laid in
approved fixed side formwork (steel channel, laying and fixing of
125 micron thick polythene film, wedges, steel plates including
levelling the formwork as per drawing), spreading the concrete
with sholvels, rakes, compacted using needle, scareed and plate
vibrators and finished in continuous operation including provision
of contraction and expansion, construction joints, applying
debonding strips, primer, sealant, dowel bars, near approaches
to bridge / culvert and construction joints, admixtures as
approved, curing of concrete slabs for 21- days, curing
compound (where specified) and water finishing to lines and
grade as per drawing and Technical Specification Clause 1501
MORD.

Kattakommu gudem road 1 x 1 1640 2.00 0.150 492.00


492.00 Cum
209 of 2191 4.CC road

5 BLD-CSTN-2-8 (16) : Filling with gravel with initial lead in


layers not exceeding 15 cm thick, consolidating each deposited
layer by watering and ramming including cost and conveyance of
water to work site and all operational, incidental, labour charges,
hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310)

Kattakommu gudem road 1 x 2 1640 0.50 0.150 246.00


246.00 Cum
6 Conveyance of excavated earth up to 5.00km lead including
loading unloading & Conveyance charges etc.

Earth worh Qty @ 30 % of 377.20 113.00 Cum


210 of 2191 4.CC road

s in Kattakommu Gudem Road under TUFIDC Assistance in Kodada Municipality

ail Cum Abstract Estimate


Rate Per Amount

84.62 Cum 31918.66

1373.66 Cum 777216.83


211 of 2191 4.CC road

4252.08 Cum 697341.12

5743.89 Cum 2825993.88


212 of 2191 4.CC road

198.38 Cum 48801.48

180.10 Cum 20351.30

Amount Rs. 4401623.27


213 of 2191 5.jun imp

Kodada Municipality
Junction improvement at Khammam cross roads and Rajiv chowk in Kodada Municipality
DETAILED AND ABSTRACT ESTIMATE
S.no Description of Item Nos L B D Qty Rate Per
1 khammam cross road in kodad town. 6.00 dia
2 Rajiv chowk in kodad town 6.00 dia
Earth work 1 x 1 16.96 0.60 0.550
PCC (1:4:8)prop 1 x 1 16.96 0.60 0.100

Central Dividers for CC Roads


1 Cutting open BT road surface (as well as asphalt
concrete upto 75 mm thick ) including water bound
macadam and stacking of excavated materials for
pipe line trench work. as directed by the departmental
officers.
2 x 1 16.96 0.100 3.4
3.4 cum 1183.87 1 cum
2 BLD-CSTN-2-1 (9): Earth work excavation in Ordinary
Soil by Manual Means-Upto 3 m depth for foundations
and depositing on bank for all lifts and with an initial
lead of 10m including all operational, incidental,
labour charges such as shoring ,sheeting, planking,
strutting, etc. complete for finished item of work
excluding dewatering charges etc as per SS - 20 B
(APSS 308).

by Manual 2 x 1 16.96 0.60 0.550 11.2

11.2 cum 210.92 1 cum


214 of 2191 5.jun imp

3 BLD-CSTN-3-5 (22) - Plain Cement concrete nominal


mix (1:4:8) prop (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine
Crushed Metal including cost and conveyance of all
materials like cement, sand, coarse aggregate water
etc., to site , labour charges , for mixing , laying,
concrete , ramming in 15 cm layers, finishing top
surface to the required level curing etc., complete for
finished item of work.for foundation and under
flooring bed.

2 x 1 16.96 0.60 0.100 2.03 cum 4252.08 1 cum


4 BLD-CSTN-6-12-(67) : Construction of RR Masonary
in Cement Mortor ( 1:6 ) Prop using hard granite
stone including cost & Conveyance of all materials like
Cement, Sand , Water, Granite Stones, labour charges
for cutting Stones to required size and shape, mixing
of Cement Mortor ,Construction, Scaffolding Charges
curing etc., complete for finished item of Work .

Below GL- for CRS 2 x 1 16.96 0.60 0.450 9.2


9.2 cum 3906.50 1 cum
5 BLD-CSTN-6-6-(61) : Construction of CRS Masonary
1st Sort in Cement Mortor ( 1:6 ) Prop using hard
granite stone including cost & Conveyance of all
materials like Cement, Sand , Water, Granite
Stones, ,labour charges for cutting Stones to
required size and shape, mixing of Cement Mortor,
Construction, Scaffolding Charges curing etc.,
complete for finished item of Work .

Above GL. 2 x 1 16.96 0.45 0.900 13.7


13.7 cum 4605.86 1 cum
215 of 2191 5.jun imp

6 Vibrated reinforced cement concrete M 20 grade


using 20mm graded HBG crushed stone aggregate
(Coarse aggregate conforming to table 1000-1 and
fine aggregate conforming to table 1000-2) including
cost, conveyance of all materials to site and labour
charges, centering, machine mixing, laying, vibrating,
curing etc., including other incidental hire and
operational charges of all T&P as per approved
drawings and as directed during execution but
excluding cost of steel and its fabrication charges for
finished item as per MoRT&H specification
1500,1600,1700 & 2200 (5th revision ) and as
directed by the Engineer-in-Charge for Bed blocks &
Backing walls (Sub-structure)

Benching 2 x 1 16.96 0.50 0.050 0.8


0.8 Cum 5248.25 1 kg
7 BLD-CSTN-2-8 (16) : Filling with gravel with initial
lead in layers not exceeding 15 cm thick, consolidating
each deposited layer by watering and ramming
including cost and conveyance of water to work site
and all operational, incidental, labour charges, hire
charges of T & P etc., complete for finished item of
work. (APSS NO. 309 & 310)

Inside devider portion 2x 1 8.01 2.55 0.40 16.3


16.3 Cum 198.38 1 Cum
8 BLD-CSTN-2-8 (16) : Filling with red earth in
central divider portion with initial lead in layers not
exceeding 15 cm thick, consolidating each deposited
layer by watering and ramming including cost and
conveyance of water to work site and all operational,
incidental, labour charges, hire charges of T & P etc.,
complete for finished item of work. (APSS NO. 309 &
310)
216 of 2191 5.jun imp

Inside devider portion 2x 1 8.01 2.55 0.50 20.4


20.4 Cum 653.68 1 Cum
9 RBR-HRTC-5 ; Turfing lawns with fine grassing
including ploughing, dressing including breaking of
clods, removal of rubbish, dressing and supplying
doobs grass roots at 10 cm apart, including supplying
and spreading of farm yard manure at rate of 0.6 cum
per 100 sqm - as per Specification 307 MORTH

2x 1 16.96 2.55 86.5


86.5 sqm 37.60 1 sqm
10 RBR-HRTC-8 : Planting flowering plants and shrubs in
central verge as per Specification 307 MORTH

2x 1 16.96 33.9
33.9 Rmt 124.94 1 Rmt
TOTAL Rs:
217 of 2191 5.jun imp

Kodada Municipality
m cross roads and Rajiv chowk in Kodada Municipality
D AND ABSTRACT ESTIMATE
Amount

4013.32

2360.19
218 of 2191 5.jun imp

8631.72

35767.91

63256.88
219 of 2191 5.jun imp

4450.51

3239.55
220 of 2191 5.jun imp

13348.15

3251.65

4236.97
142556.85
Page 221 of 2191 6.pathway

Kodad Municipality

Providing Footpaths in Various Roads in Kodad Municipality


Providing Footpaths
S.N. Description of Item Nos L B D Quantity Unit Rate
1 RBR-FNDN-1 -manual means : Earthwork excavation for structures in
all types of soil as per drawing and technical specifications including
setting out, construction of shoring and bracing, removal of stumps
and other deleterious material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with
excavated suitable material as per Technical Specification 305
MORD / 304 MORTH. Data- Bld,
S.No. 7
2m wide Pathways 1 x 1 3100.00 2.00 0.20 1240.00
1240.00 Cum 210.92
2 BLD-CSTN-3-5 (22) - Plain Cement concrete nominal mix (1:4:8) prop
(Cement : fine aggregate: coarse aggregate ) using 20mm size Hard
Granite Machine Crushed Metal including cost and conveyance of all
materials like cement, sand, coarse aggregate water etc., to site ,
charges on all materials, labour charges , for mixing , laying,
concrete , ramming in 15 cm layers, finishing top surface to the
required level curing etc., complete for finished item of work.

2m wide Pathways 1 x 1 3100.00 2.00 0.100 620.00


Deduction for Planting Trees @ 10 mtrs c/c(pi*d^2/4*th) 1 x 1 310.00 0.36 0.100 11.16
(3.141/4*0.6^2*0.1)
608.84 Cum 4252.08
3 RBR-CCPV-13 - ii: Providing and Laying of Interlocking Concrete Block
Pavements using precast concrete blocks for paving of M-30 grade
and thickness not less than 50 mm for Non traffic areas conforming
to IS 15658:2006 in all shapes and designs as per the manufacturer's
Specification including cost and conveyance of all material and all
labour charges etc,. complete. Data- Bld ,
S.No 38
Page 222 of 2191 6.pathway

S.N. Description of Item Nos L B D Quantity Unit Rate


2m wide Pathways 1 x 1 3100.00 2.00 6200.00
Deduction for Planting Trees(pi*d)(3.141*0.6) 1 x 1 310.00 1.88 584.04
5615.96 Sqm 570.70
Page 223 of 2191 6.pathway

S.N. Description of Item Nos L B D Quantity Unit Rate


4 RBR-TSRA-29 : Cast in Situ Cement Concrete M20 Kerb: Construction
of cement concrete kerb with top and bottom width 115 and 165 mm
respectively, 250 mm high in M 20 grade PCC on M-10 grade
foundation 150 mm thick, foundation having 50 mm projection
beyond kerb stone, kerb stone laid with kerb laying machine,
foundation concrete laid manually, all complete as per clause 408
MORTH Data- Bld ,
S.No 19
Curb wall as per requirement 1 x 2 3100.00 6200.00 rmt 286.24
5 BLD-CSTN-8-2-(77) : Plastering with 12mm thick in single coat in CM
(1:4) finished smooth including cost and conveyance of all materials
to site, charges on all materials, finishing, curing, scaffolding and all
operational, incidental, labour charges etc., including cutting grooves
where ever necessary etc., complete for finished item of work. (As
per SS 903).

1 x 2 3100.00 0.45 2790.00 Sqm 150.75


6 Painting to M20 kerb walls with 2 - coats of ready mixed first quality
synthetic enamel paint ( ready mixed Synthetic Enamel paints in all
shades Grade - II having VOC (Volatile Organic Compound ) content
less than 50 grams/ Lit.) of approved brand and shade over an
existing steel primer, including cost and conveyance of all materials to
work site and all operational, incidental, labour charges etc.,
complete - BLD-CSTN-10-12-v

outer sides of curb wall above GL 1 x 2 3100.00 0.45 2790.00


Total 2790.00 Sqm 112.35
RBR-HRTC-9: Planting of trees by the road side (Avenue trees) in
0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with
decayed farm yard/sludge manure, planting the saplings, backfilling
7
the trench, watering, fixing the tree guard and maintaining the plants
for one year- as per Specification 307 MORTH

1 x 1 310.00 310.00 Each 1550.80


Page 224 of 2191 6.pathway

S.N. Description of Item Nos L B D Quantity Unit Rate


Providing and fixing MS iron tree guard 60 cm dia and 2 metre high
above ground level formed of 4 Nos (25 x 6 mm) and 8 Nos (25 x 3
mm) vertical MS riveted to 3 Nos (25 x 6 mm) iron rings in two
8 halves, bolted together with 8 mm dia and 30 mm long bolts
including painting two coats with paint of approved brand over a coat
of priming, complete in all respects.
1 x 1 310.00 310.00 No.s 2037.17

Total cost of the estimation Rs.


Page 225 of 2191 6.pathway

odad Municipality

n Various Roads in Kodad Municipality


Providing Footpaths
Per Amount

1 Cum 261540.80

1 Cum 2588836.39
Page 226 of 2191 6.pathway

Per Amount

1 Sqm 3205028.37
Page 227 of 2191 6.pathway

Per Amount

1 rmt 1774688.00

1 Sqm 420592.50

1 Sqm 313456.50

1 Each 480748.00
Page 228 of 2191 6.pathway

Per Amount

1 No.s 631522.70
9676413.26

Total 9676413.26
e estimation Rs. Say 96.76 Lakhs
229 of 2191 BT Rd - Det

NAME OF WORK : DEVELOPMENT OF BT ROADS UNDER TUFIDC ASSISTANCE IN


KODADA MUNICIPALITY

Estimated Cost Rs.


DETAILED ESTIAMTE
Sl
No Description of item Quantity

1 2 3
1 Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket
capacity including cutting and loading in tippers, trimming bottom and side
slopes, in accordance with requirements of lines, grades and cross-sections,
and transporting to the embankment location with all lifts and lead upto 1000
m as per Technical Specification Clause 302.3 MORD / 301 MORTH

i) Road No.1(A): Widening of BT Road from Red Chillies Restaurant to HP Petrol


10602.00
Bunk in Suryapet Road in Kodada Municipality
ii) Road No.2: Widening of BT Road from Khammam Cross Roads to NH-65 in
5167.80
Gudibanda Road in Kodada Municipality
iii) Road No.3: Widening of BT Road from Khammam Cross Roads to Pichaiah
3960.00
Bricks factory at RTA Office Road in Kodada Municipality
iv) Road No.4: Widening of BT Road from Rajiv Chowk to NH-65 at Huzurnagar
4636.95
Road in Kodada Municipality
v) Road No.5: Laying of BT Road from Ananthagiri Road to Lakshmipuram
1710.62
Village in Kodada Municipality
26077.37 Cum
2 Loosening of the ground upto a level of 300 mm below the subgrade level,
watered, graded and compacted in layers to meet requirement of Tables
300.1 and 300.2 for subgrade construction as per Technical Specification
Clause 303.5.2 MORD / 305 MORTH. RBR-EECD-16

i) Road No.1(A): Widening of BT Road from Red Chillies Restaurant to HP Petrol


5580.00
Bunk in Suryapet Road in Kodada Municipality
ii) Road No.2: Widening of BT Road from Khammam Cross Roads to NH-65 in
2871.00
Gudibanda Road in Kodada Municipality
iii) Road No.3: Widening of BT Road from Khammam Cross Roads to Pichaiah
1980.00
Bricks factory at RTA Office Road in Kodada Municipality
iv) Road No.4: Widening of BT Road from Rajiv Chowk to NH-65 at Huzurnagar
2440.50
Road in Kodada Municipality
v) Road No.5: Laying of BT Road from Ananthagiri Road to Lakshmipuram
1127.88
Village in Kodada Municipality
13999.38 Cum

3 Conveyance of excavated earth up to 5.00 km lead including loading and


unloading chargs etc
@ 20 % excavated soils 5215.47 Cum
230 of 2191 BT Rd - Det

Sl
No Description of item Quantity

1 2 3
20%

4 Construction of granular sub-base by providing Grade III with a minimum


CBR Value 10 by well graded material of 9.50mm to 4.75mm @66% and
2.36mm below @ 34%, spreading in uniform layers with motor grader on
prepared surface, mixing by mix in place method with rotavator at OMC, and
compacting with Vibratory Roller 80 to 100 KN to achieve the desired
density, complete as per Technical Specification Clause 401 MORD / MORTH.

i) Road No.1(A): Widening of BT Road from Red Chillies Restaurant to HP Petrol


3720.00
Bunk in Suryapet Road in Kodada Municipality
ii) Road No.2: Widening of BT Road from Khammam Cross Roads to NH-65 in
1914.00
Gudibanda Road in Kodada Municipality
iii) Road No.3: Widening of BT Road from Khammam Cross Roads to Pichaiah
1716.00
Bricks factory at RTA Office Road in Kodada Municipality
iv) Road No.4: Widening of BT Road from Rajiv Chowk to NH-65 at Huzurnagar
1627.00
Road in Kodada Municipality
v) Road No.5: Laying of BT Road from Ananthagiri Road to Lakshmipuram
564.03
Village in Kodada Municipality
9541.03 Cum

5 Providing, laying, spreading and compacting graded stone aggregate to wet


mix macadam (WMM) specification including premixing the material with
water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by
tipper to site, laying in uniform layers in sub-base/base course on a well
prepared sub-base and compacting with smooth wheel roller of 80 to 100kN /
Vibratory Roller 80-100 kN weight to achieve the desired density including
lighting, barricading and maintenance of diversion, etc as per Tables 400.11 &
400.12 and Technical Specification Clause 406 MORD / MORTH.

i) Road No.1(A): Widening of BT Road from Red Chillies Restaurant to HP Petrol 4650.00
Bunk in Suryapet Road in Kodada Municipality
ii) Road No.2: Widening of BT Road from Khammam Cross Roads to NH-65 in 2392.50
Gudibanda Road in Kodada Municipality
iii) Road No.3: Widening of BT Road from Khammam Cross Roads to Pichaiah 1650.00
Bricks factory at RTA Office Road in Kodada Municipality
Road No.4: Widening of BT Road from Rajiv Chowk to NH-65 at Huzurnagar 2033.75
Road in Kodada Municipality
Road No.5: Laying of BT Road from Ananthagiri Road to Lakshmipuram 845.84
Village in Kodada Municipality
11572.09 Cum
231 of 2191 BT Rd - Det

Sl
No Description of item Quantity

1 2 3
6 Providing and applying with prime coat with Bitumen Emulsion (RS-I)@ 0.60
kg / sqm on prepares surface of granular surface including cost and
conveyance of all materials to work site and laid on prepared surface and
including clearing the road surface and spraying primer etc., complete for
finished item of work as per MoRT&H Specification 502 (5th Revision) and as
directed by the Engineer-in-charge.

i) Road No.1(A): Widening of BT Road from Red Chillies Restaurant to HP Petrol 18600.00
Bunk in Suryapet Road in Kodada Municipality
ii) Road No.2: Widening of BT Road from Khammam Cross Roads to NH-65 in 9570.00
Gudibanda Road in Kodada Municipality
iii) Road No.3: Widening of BT Road from Khammam Cross Roads to Pichaiah 6600.00
Bricks factory at RTA Office Road in Kodada Municipality
Road No.4: Widening of BT Road from Rajiv Chowk to NH-65 at Huzurnagar 8135.00
Road in Kodada Municipality
Road No.5: Laying of BT Road from Ananthagiri Road to Lakshmipuram 3759.50
Village in Kodada Municipality
46664.50 Sqm

7 Providing and applying tack coat with bitumen emulsion RS-1 using Bitumen
pressure distributor at the rate of 0.20 Kgs per sqm on the prepared
bituminous/granular surface cleaned with mechanical broom for finished item
of work as per MoRT&H Specification 503 (5th revision) and as directed by
the Engineer-in-Charge.

For DBM & BC


i) Road No.1(A): Widening of BT Road from Red Chillies Restaurant to HP Petrol 18600.00
Bunk in Suryapet Road in Kodada Municipality

ii) Road No.2: Widening of BT Road from Khammam Cross Roads to NH-65 in 9570.00
Gudibanda Road in Kodada Municipality

iii) Road No.3: Widening of BT Road from Khammam Cross Roads to Pichaiah 6600.00
Bricks factory at RTA Office Road in Kodada Municipality

Road No.4: Widening of BT Road from Rajiv Chowk to NH-65 at Huzurnagar 8135.00
Road in Kodada Municipality

Road No.5: Laying of BT Road from Ananthagiri Road to Lakshmipuram 3759.50


Village in Kodada Municipality
46664.50 Sqm
232 of 2191 BT Rd - Det

Sl
No Description of item Quantity

1 2 3
8 Providing and laying of 50 mm thick Dense Graded Bituminous Macadam
(DBM) grading - II with with 40-60 TPH hot mix plant producing an output of
37.50 t per hour using BT 60/70 grade @ 4.50% crushed aggregates of
specified grading premixed with bituminous binder, transported to site, laid
over a previously prepared surface with paver finisher to the required grade,
level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the
desired compaction as per Tech. specification No. 504 MORTH for finished
item of work as directed by the Engineer-in-Charge including hire and
operational charges all T&P and all other contingent charges necessary
including cost of (excluding seigniorage) charges of all materials etc.,
complete (Excluding VAT Charges)

i) Road No.1(A): Widening of BT Road from Red Chillies Restaurant to HP Petrol 1488.00
Bunk in Suryapet Road in Kodada Municipality
ii) Road No.2: Widening of BT Road from Khammam Cross Roads to NH-65 in 478.50
Gudibanda Road in Kodada Municipality
iii) Road No.3: Widening of BT Road from Khammam Cross Roads to Pichaiah 330.00
Bricks factory at RTA Office Road in Kodada Municipality
Road No.4: Widening of BT Road from Rajiv Chowk to NH-65 at Huzurnagar 650.80
Road in Kodada Municipality
Road No.5: Laying of BT Road from Ananthagiri Road to Lakshmipuram 188.08
Village in Kodada Municipality
Quantity as per separate sheet 3135.38
Add Camber correction 10% 313.54
3448.92 Cum

9 Providing 30 mm thick compacted Bituminous Concrete with 100-120 TPH


Batch Mix type using HBG/HBT crushed aggregates of Grading-2 as per table
500-17 of specification 507 of MoRT&H (5th revision), premixed with Bitumen
binder VG 30 Grade @ 5.4 % of mix and filler, transporting the hot mix to
work site, laying with Hydrostatic sensor paver finisher to the required grade,
level and alignment, rolling with smooth wheeled, vibratory and tandem
rollers to achieve the desired compaction as per MoRT&H Specification 507
(5th revision) complete for finished item of work in all respects as directed by
Engineer-in-Charge (Payment will be made based on levels for finished item
of work) (Excluding VAT Charges) (RBR-BASC-9)

i) Road No.1(A): Widening of BT Road from Red Chillies Restaurant to HP Petrol 744.00
Bunk in Suryapet Road in Kodada Municipality
ii) Road No.2: Widening of BT Road from Khammam Cross Roads to NH-65 in 382.80
Gudibanda Road in Kodada Municipality
iii) Road No.3: Widening of BT Road from Khammam Cross Roads to Pichaiah 264.00
Bricks factory at RTA Office Road in Kodada Municipality
Road No.4: Widening of BT Road from Rajiv Chowk to NH-65 at Huzurnagar 325.40
Road in Kodada Municipality
Road No.5: Laying of BT Road from Ananthagiri Road to Lakshmipuram 112.89
Village in Kodada Municipality
233 of 2191 BT Rd - Det

Sl
No Description of item Quantity

1 2 3
1829.09 Cum
10 Providing and filling with gravel brought from out side and labouur charges
for filling and spreading in layers of not more than 150mm thick each or as
directed by engineer-in-charge during execution, watering, compacting each
layer, labour charges for all operations, all water leads etc complete.

i) Road No.1(A): Widening of BT Road from Red Chillies Restaurant to HP Petrol 700.00
Bunk in Suryapet Road in Kodada Municipality

ii) Road No.2: Widening of BT Road from Khammam Cross Roads to NH-65 in 290.00
Gudibanda Road in Kodada Municipality

iii) Road No.3: Widening of BT Road from Khammam Cross Roads to Pichaiah 200.00
Bricks factory at RTA Office Road in Kodada Municipality

Road No.4: Widening of BT Road from Rajiv Chowk to NH-65 at Huzurnagar 240.00
Road in Kodada Municipality

1430.00 Cum
234 of 2191 Rd-1

Road No.1(A): Widening of BT Road from Red Chillies Restaurant to HP Petrol Bunk in Suryapet Road in Kodada

Earth work excavation for widening portion Loosening GSB WMM DBM
Exist RD Prop RD of Soil (cum) (cum) (cum)
Width (m) Avg Width (m) Prime &
Length
CH Sum of Tack Coat
(m) Avg. Width Depth Qty (Sqm)
(m) (cum) 300 THK
23.00' 44.60' Lef Right Lef Right (m) 0.200 0.250 0.080
CUM

1(A): Widening of BT Road from Red Chillies Restaurant to HP Petrol Bunk in Suryapet Road

0 7.00 13.60 3.30 3.30

50 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

100 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

150 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

200 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

250 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

300 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

350 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

400 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

450 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

500 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

550 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

600 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

650 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

700 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

750 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

800 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

850 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

234 - of - 2191
235 of 2191 Rd-1

Earth work excavation for widening portion Loosening GSB WMM DBM
Exist RD Prop RD of Soil (cum) (cum) (cum)
Width (m) Avg Width (m) Prime &
Length
CH Sum of Tack Coat
(m) Avg. Width Depth Qty (Sqm)
(m) (cum) 300 THK
23.00' 44.60' Lef Right Lef Right (m) 0.200 0.250 0.080
CUM

900 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

950 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

1000 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

1050 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

1100 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

1150 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

1200 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

1250 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

1300 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

1350 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

1400 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

1450 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

1500 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

1550 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

1600 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

1650 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

1700 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

1750 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

1800 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

1850 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

235 - of - 2191
236 of 2191 Rd-1

Earth work excavation for widening portion Loosening GSB WMM DBM
Exist RD Prop RD of Soil (cum) (cum) (cum)
Width (m) Avg Width (m) Prime &
Length
CH Sum of Tack Coat
(m) Avg. Width Depth Qty (Sqm)
(m) (cum) 300 THK
23.00' 44.60' Lef Right Lef Right (m) 0.200 0.250 0.080
CUM

1900 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

1950 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

2000 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.570 188.10 99.00 66.00 82.50 330.00 26.40

Total Qty: 7524.00 3960.00 2640.00 3300.00 13200.00 1056.00

236 - of - 2191
237 of 2191 Rd-1

Earth work excavation for widening portion Loosening GSB WMM DBM
Exist RD Prop RD of Soil (cum) (cum) (cum)
Width (m) Avg Width (m) Prime &
Length
CH Sum of Tack Coat
(m) Avg. Width Depth Qty (Sqm)
(m) (cum) 300 THK
23.00' 44.60' Lef Right Lef Right (m) 0.200 0.250 0.080
CUM

1 (B): Widening of BT Road from Khammam cross road to NH-65 in Sri rangapuram road.

0 10.00 13.60 1.80 1.80

50 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40

100 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40

150 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40

200 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40

250 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40

300 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40

350 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40

400 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40

450 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40

500 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40

550 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40

600 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40

650 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40

700 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40

750 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40

800 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40

850 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40

900 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40

237 - of - 2191
238 of 2191 Rd-1

Earth work excavation for widening portion Loosening GSB WMM DBM
Exist RD Prop RD of Soil (cum) (cum) (cum)
Width (m) Avg Width (m) Prime &
Length
CH Sum of Tack Coat
(m) Avg. Width Depth Qty (Sqm)
(m) (cum) 300 THK
23.00' 44.60' Lef Right Lef Right (m) 0.200 0.250 0.080
CUM

950 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40

1000 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40

1050 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40

1100 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40

1150 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40

1200 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40

1250 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40

1300 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40

1350 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40

1400 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40

1450 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40

1500 10.00 13.60 50.00 1.80 1.80 1.80 1.80 3.60 0.570 102.60 54.00 36.00 45.00 180.00 14.40

Total Qty: 3078.00 1620.00 1080.00 1350.00 5400.00 432.00

Total Qty: 10602.00 5580.00 3720.00 4650.00 18600.00 1488.00

238 - of - 2191
239 of 2191 Rd-1

Restaurant to HP Petrol Bunk in Suryapet Road in Kodada Municipality

BC Gravel filling Qty


(cum) Width (m) (cum)

0.040 Lef Right Lef Right Total 0.200

0.50 0.50

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

239 - of - 2191
240 of 2191 Rd-1

BC Gravel filling Qty


(cum) Width (m) (cum)

0.040 Lef Right Lef Right Total 0.200

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

240 - of - 2191
241 of 2191 Rd-1

BC Gravel filling Qty


(cum) Width (m) (cum)

0.040 Lef Right Lef Right Total 0.200

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

528.00 400.00

241 - of - 2191
242 of 2191 Rd-1

BC Gravel filling Qty


(cum) Width (m) (cum)

0.040 Lef Right Lef Right Total 0.200

0.50 0.50

7.20 0.50 0.50 0.50 0.50 1.00 10.00

7.20 0.50 0.50 0.50 0.50 1.00 10.00

7.20 0.50 0.50 0.50 0.50 1.00 10.00

7.20 0.50 0.50 0.50 0.50 1.00 10.00

7.20 0.50 0.50 0.50 0.50 1.00 10.00

7.20 0.50 0.50 0.50 0.50 1.00 10.00

7.20 0.50 0.50 0.50 0.50 1.00 10.00

7.20 0.50 0.50 0.50 0.50 1.00 10.00

7.20 0.50 0.50 0.50 0.50 1.00 10.00

7.20 0.50 0.50 0.50 0.50 1.00 10.00

7.20 0.50 0.50 0.50 0.50 1.00 10.00

7.20 0.50 0.50 0.50 0.50 1.00 10.00

7.20 0.50 0.50 0.50 0.50 1.00 10.00

7.20 0.50 0.50 0.50 0.50 1.00 10.00

7.20 0.50 0.50 0.50 0.50 1.00 10.00

7.20 0.50 0.50 0.50 0.50 1.00 10.00

7.20 0.50 0.50 0.50 0.50 1.00 10.00

7.20 0.50 0.50 0.50 0.50 1.00 10.00

242 - of - 2191
243 of 2191 Rd-1

BC Gravel filling Qty


(cum) Width (m) (cum)

0.040 Lef Right Lef Right Total 0.200

7.20 0.50 0.50 0.50 0.50 1.00 10.00

7.20 0.50 0.50 0.50 0.50 1.00 10.00

7.20 0.50 0.50 0.50 0.50 1.00 10.00

7.20 0.50 0.50 0.50 0.50 1.00 10.00

7.20 0.50 0.50 0.50 0.50 1.00 10.00

7.20 0.50 0.50 0.50 0.50 1.00 10.00

7.20 0.50 0.50 0.50 0.50 1.00 10.00

7.20 0.50 0.50 0.50 0.50 1.00 10.00

7.20 0.50 0.50 0.50 0.50 1.00 10.00

7.20 0.50 0.50 0.50 0.50 1.00 10.00

7.20 0.50 0.50 0.50 0.50 1.00 10.00

7.20 0.50 0.50 0.50 0.50 1.00 10.00

216.00 300.00

744.00 700.00

243 - of - 2191
244 of 2191 Rd-2

Road No.2: Widening of BT Road from Khammam Cross Roads to NH-65 in Gudibanda Road in Kodada Mun

Earth work excavation for widening portion Loosening GSB WMM DBM
Exist RD Prop RD of Soil (cum) (cum) Prime & (cum)
Length Width (m) Avg Width (m)
CH Sum of Tack Coat
(m)
Avg. Width Depth Qty (Sqm)
(m) (cum)
Lef Right Lef Right (m) 300 THK 0.200 0.250 0.050

0 7.00 13.60 0.00 3.300 3.300 13.600

50 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50

100 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50

150 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50

200 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50

250 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50

300 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50

350 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50

400 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50

450 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50

500 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50

550 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50

600 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50

650 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50

700 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50

750 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50

800 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50

850 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50

900 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50
245 of 2191 Rd-2

Earth work excavation for widening portion Loosening GSB WMM DBM
Exist RD Prop RD of Soil (cum) (cum) Prime & (cum)
Length Width (m) Avg Width (m)
CH Sum of Tack Coat
(m)
Avg. Width Depth Qty (Sqm)
(m) (cum)
Lef Right Lef Right (m) 300 THK 0.200 0.250 0.050

950 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50

1000 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50

1050 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50

1100 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50

1150 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50

1200 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50

1250 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50

1300 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50

1350 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50

1400 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50

1450 7.00 13.60 50.00 3.300 3.300 3.30 3.30 6.60 0.540 178.20 99.00 66.00 82.50 330.00 16.50

Total Qty: 5167.80 2871.00 1914.00 2392.50 9570.00 478.50


246 of 2191 Rd-2

oss Roads to NH-65 in Gudibanda Road in Kodada Municipality

BC Gravel filling Qty


(cum) Width (m) (cum)

0.040 Lef Right Lef Right Total 0.200

0.50 0.50

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00


247 of 2191 Rd-2

BC Gravel filling Qty


(cum) Width (m) (cum)

0.040 Lef Right Lef Right Total 0.200

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

382.80 290.00
248 of 2191 Rd-3

Road No.3: Widening of BT Road from Khammam Cross Roads to Pichaiah Bricks factory at RTA Office Road in K

EWE Loosening GSB WMM DBM


Exist RD Prop RD Prime & Tack
Length of Soil (cum) (cum) (cum)
CH Width (m) Avg Width (m) Sum of Coat
(m)
Avg. Width Depth Qty (Sqm)
(m) (cum)
Lef Right Lef Right (m) 300 THK 0.260 0.250 0.050

0 7.00 13.60 0.00 3.30 3.30

50 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50

100 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50

150 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50

200 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50

250 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50

300 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50

350 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50

400 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50

450 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50

500 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50

550 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50

600 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50

650 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50

700 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50

750 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50

800 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50

850 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50

900 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50

950 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50
249 of 2191 Rd-3

EWE Loosening GSB WMM DBM


Exist RD Prop RD Prime & Tack
Length of Soil (cum) (cum) (cum)
CH Width (m) Avg Width (m) Sum of Coat
(m)
Avg. Width Depth Qty (Sqm)
(m) (m) (cum)
Lef Right Lef Right 300 THK 0.260 0.250 0.050

1000 7.00 13.60 50.00 3.30 3.30 3.30 3.30 6.60 0.600 198.00 99.00 85.80 82.50 330.00 16.50

Total Qty: 3960.00 1980.00 1716.00 1650.00 6600.00 330.00


250 of 2191 Rd-3

oads to Pichaiah Bricks factory at RTA Office Road in Kodada Municipality


Gravel filling
BC Qty
(cum) (cum)
Width (m) Avg Width (m) Sum of
Avg. Width
0.040 Lef Right Lef Right (m) 0.200

0.50 0.50

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00

13.20 0.50 0.50 0.50 0.50 1.00 10.00


251 of 2191 Rd-3

Gravel filling
BC Qty
(cum) (cum)
Width (m) Avg Width (m) Sum of
Avg. Width
0.040 Lef Right Lef Right (m) 0.200

13.20 0.50 0.50 0.50 0.50 1.00 10.00

264.00 200.00
252 of 2191 Rd-4

Road No.4: Widening of BT Road from Rajiv Chowk to NH-65 at Huzurnagar Road in Kodada Munici

EWE Loosening GSB WMM DBM


Exist RD Prop RD Prime & Tack
Length of Soil (cum) (cum) (cum)
CH Width (m) Avg Width (m) Sum of Coat
(m)
Avg. Width Depth Qty (Sqm)
(m) (cum)
Lef Right Lef Right (m) 300 THK 0.200 0.250 0.080

0 6.70 13.60 0.00 3.45 3.45

50 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60

100 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60

150 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60

200 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60

250 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60

300 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60

350 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60

400 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60

450 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60

500 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60

550 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60

600 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60

650 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60

700 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60

750 6.70 13.60 50.00 3.45 3.45 3.45 3.45 4.00 0.570 114.00 60.00 40.00 50.00 200.00 16.00

800 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60

850 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60

900 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60

950 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60
253 of 2191 Rd-4

EWE Loosening GSB WMM DBM


Exist RD Prop RD Prime & Tack
Length of Soil (cum) (cum) (cum)
CH Width (m) Avg Width (m) Sum of Coat
(m)
Avg. Width Depth Qty (Sqm)
(m) (m) (cum)
Lef Right Lef Right 300 THK 0.200 0.250 0.080

1000 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60

1050 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60

1100 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60

1150 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60

1200 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60

1250 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60

1300 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60

1350 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60

1400 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60

1450 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60

1500 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60

1550 6.70 13.60 50.00 3.45 3.45 3.45 3.45 6.90 0.570 196.65 103.50 69.00 86.25 345.00 27.60

Total Qty: 4636.95 2440.50 1627.00 2033.75 8135.00 650.80


254 of 2191 Rd-4

Chowk to NH-65 at Huzurnagar Road in Kodada Municipality


Gravel filling
BC Qty
(cum) (cum)
Width (m) Avg Width (m) Sum of
Avg. Width
0.040 Lef Right Lef Right (m) 0.200

0.50 0.50

13.80 0.50 0.50 0.50 0.50 1.00 10.00

13.80 0.50 0.50 0.50 0.50 1.00 10.00

13.80 0.50 0.50 0.50 0.50 1.00 10.00

13.80 0.50 0.50 0.50 0.50 1.00 10.00

13.80 0.50 0.50 0.50 0.50 1.00 10.00

13.80 0.50 0.50 0.50 0.50 1.00 10.00

13.80 0.50 0.50 0.50 0.50 1.00 10.00

13.80 0.50 0.50 0.50 0.50 1.00 10.00

13.80 0.50 0.50 0.50 0.50 1.00 10.00

13.80 0.50 0.50 0.50 0.50 1.00 10.00

13.80 0.50 0.50 0.50 0.50 1.00 10.00

13.80 0.50 0.50 0.50 0.50 1.00 10.00

13.80 0.50 0.50 0.50 0.50 1.00 10.00

13.80 0.50 0.50 0.50 0.50 1.00 10.00

8.00 0.50 0.50 0.50 0.50 1.00 10.00

13.80 0.50 0.50 0.50 0.50 1.00 10.00

13.80 0.50 0.50 0.50 0.50 1.00 10.00

13.80 0.50 0.50 0.50 0.50 1.00 10.00

13.80 0.50 0.50 0.50 0.50 1.00 10.00


255 of 2191 Rd-4

Gravel filling
BC Qty
(cum) (cum)
Width (m) Avg Width (m) Sum of
Avg. Width
0.040 Lef Right Lef Right (m) 0.200

13.80 0.50 0.50 0.50 0.50 1.00 10.00

13.80 0.50 0.50 0.50 0.50 1.00 10.00

13.80 0.50 0.50 0.50 0.50 1.00 10.00

13.80 0.50 0.50 0.50 0.50 1.00 10.00

13.80 0.50 0.50 0.50 0.50 1.00 10.00

13.80 0.50 0.50 0.50 0.50 1.00 10.00

13.80 0.50 0.50 0.50 0.50 1.00 10.00

13.80 0.50 0.50 0.50 0.50 1.00 10.00

13.80 0.50 0.50 0.50 0.50 1.00 10.00

13.80 0.50 0.50 0.50 0.50 1.00 10.00

13.80 0.50 0.50 0.50 0.50 1.00 10.00

13.80 0.50 0.50 0.50 0.50 1.00 10.00

325.40 240.00
256 of 2191 Rd-5

Road No.5: Laying of BT Road from Ananthagiri Road to Lakshmipuram Village in Kodada Municipality

EWE Loosening GSB WMM DBM BC


Exist RD Prop RD Prime &
Length of Soil (cum) (cum) (cum) (cum)
CH Width (m) Avg Width (m) Sum of Tack Coat
(m)
Avg. Width Depth Qty (Sqm)
(m) (cum)
Lef Right Lef Right (m) 300 THK 0.150 0.225 0.050 0.030

0 0.00 3.65 0.00 1.83 1.83

50 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48

100 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48

150 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48

200 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48

250 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48

300 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48

350 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48

400 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48

450 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48

500 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48

550 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48

600 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48

650 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48

700 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48

750 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48

800 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48

850 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48

900 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48

950 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48
257 of 2191 Rd-5

EWE Loosening GSB WMM DBM BC


Exist RD Prop RD Prime &
Length of Soil (cum) (cum) (cum) (cum)
CH Width (m) Avg Width (m) Sum of Tack Coat
(m)
Avg. Width Depth Qty (Sqm)
(m) (m) (cum)
Lef Right Lef Right 300 THK 0.150 0.225 0.050 0.030

1000 0.00 3.65 50.00 1.83 1.83 1.83 1.83 3.65 0.455 83.04 54.75 27.38 41.06 182.50 9.13 5.48

1030 0.00 3.65 30.00 1.83 1.83 1.83 1.83 3.65 0.455 49.82 32.85 16.43 24.64 109.50 5.48 3.29

Total Qty: 1710.62 1127.88 564.03 845.84 3759.50 188.08 112.89


258 of 2191 Rd-5

i Road to Lakshmipuram Village in Kodada Municipality


Gravel filling
Qty
(cum)
Width (m) Avg Width (m) Sum of
Avg. Width
Lef Right Lef Right (m) 0.000

0.38 0.38

0.50 0.50 0.44 0.44 0.88 0.00

0.50 0.50 0.50 0.50 1.00 0.00

0.50 0.50 0.50 0.50 1.00 0.00

0.50 0.50 0.50 0.50 1.00 0.00

0.50 0.50 0.50 0.50 1.00 0.00

0.50 0.50 0.50 0.50 1.00 0.00

0.50 0.50 0.50 0.50 1.00 0.00

0.50 0.50 0.50 0.50 1.00 0.00

0.50 0.50 0.50 0.50 1.00 0.00

0.50 0.50 0.50 0.50 1.00 0.00

0.50 0.50 0.50 0.50 1.00 0.00

0.50 0.50 0.50 0.50 1.00 0.00

0.50 0.50 0.50 0.50 1.00 0.00

0.50 0.50 0.50 0.50 1.00 0.00

0.50 0.50 0.50 0.50 1.00 0.00

0.50 0.50 0.50 0.50 1.00 0.00

0.50 0.50 0.50 0.50 1.00 0.00

0.50 0.50 0.50 0.50 1.00 0.00

0.50 0.50 0.50 0.50 1.00 0.00


259 of 2191 Rd-5

Gravel filling
Qty
(cum)
Width (m) Avg Width (m) Sum of
Avg. Width
Lef Right Lef Right (m) 0.000

0.50 0.50 0.50 0.50 1.00 0.00

0.50 0.50 0.50 0.50 1.00 0.00

0.00
260 of 2191 Culvert

Construction of Box Culvert 2000x2000mm Size


DETAILED CUM ABSTRACT ESTIMATE
Sl No Description Nos Length Breath
1 RBR-FNDN-1- ( I-A-i ) In ordinary soils,
up to 3.00 Mts depth below GL by Manual
means: Earthwork excavation in all kinds of
soil for Pipe line trenches as per drawings and
technical specifications including setting out,
construction of shoring and bracing, removal of
stumps and other deleterious material ,
dressing of sides and bottom as per Technical
Specification 305 MoRD / 304 MoRTH and as
directed by the departmental officer including
protecting the existing utility services wherever
it is possible during the execution and taking
all precautionary measures in the restricted
areas for laying sewer/water pipe lines
including divertion of traffic and backfilling in
trenches with excavated suitable material and
disposal of remaining earth upto a lead of 50
m, including all incidental and operational
charges etc., complete by manual means.

Culvert portion 3x 1 15.00 4.10

2 Dewatering pipe line trenches etc, duly


bailing out water from the pipe line trenches
with oil engine driven pumpsets, including hire
charges, fuel charges and wages for Driver and
Helper and all other incidental and operational
charges including suction and delivery hose,
lead of drain in to natural drain etc, complete.
nos day hr Hp
1pumps-8hours-5Hp - 8 days 1 x 8 5.00 5
3 BLD-CSTN-2-8 (16): Collection, Supply and
filling with HBG stone chips 2.36 mm & below
from approved quarry to work site and stacking
at work site to Dept. gauge for
premeasurements including cost and
convenyance of all material and all labour
charges etc. complete as per standard
specifications. Clause 305.3.9 MORD & 304
MORTH

From 0.00 mtrs To 15 Mtrs 3x 1 15.00 3.10


261 of 2191 Culvert

4 BLD-CSTN-3-5 (22) : Plain Cement concrete


nominal mix (1:4:8) prop (Cement : fine
aggregate: coarse aggregate ) using 20mm size
Hard Granite Machine Crushed Metal including
cost and conveyance of all materials like
cement, sand, coarse aggregate water etc., to
site, labour charges , for mixing , laying,
concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc.,
complete for finished item of work.for
foundation and under flooring bed.

From 0.00 mtrs To 15 Mtrs 3 x 1 15.00 3.10

5 BLD-CSTN-3-13-(30)-C ; RCC M- 25 Nominal


mix (Cement:fine aggregate: coarse aggregate)
corresponding to Table 9 of IS 456 using 20mm
size graded machine crushed hard granite metal
(coarse aggregate) from approved quarry
including cost and conveyance of all materials
like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including
Seigniorage charges, sales & other taxes on all
materials including all operational, incidental
and labour charges such as machine mixing,
laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication
charges for finished item of work

Baseslab 3x 1 15.00 2.800


provide for haunches

6 BLD-CSTN-3-13-(30)-C ; RCC M- 25 Nominal


mix (Cement:fine aggregate: coarse aggregate)
corresponding to Table 9 of IS 456 using 20mm
size graded machine crushed hard granite metal
(coarse aggregate) from approved quarry
including cost and conveyance of all materials
like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including
Seigniorage charges, sales & other taxes on all
materials including all operational, incidental
and labour charges such as machine mixing,
laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication
charges for finished item of work
262 of 2191 Culvert

a Side walls 400mm thick 3x 2 15.000 0.400


RCC cross barrier 3x 2 3.000 0.200

b Top slab : 400mm thick 3x 1 15.000 0.400

7 BLD-CSTN-4-1-(34) : Providing High Yield


Strength Deformed (HYSD)/ Thermo
Mechanically Treated (TMT) / Mild steel (MS)
steel bars ( Fe 500 grade as per IS 1786-1979)
of different diameters for RCC works , including
labour charges for straightening, cutting,
bending to required sizes and shapes, placing
in position with cover blocks of approved
materials and size and tying and lap-splicing
with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs
and drawings, including cost and conveyance of
steel bars, including all wastages such as
overlaps, couplings, chairs, spacer bars
including cost and conveyance of binding wire,
cover blocks and all incidental, operational,
labour charges such as cutting, bending,
placing in position, tying including sales and
other taxes on all materials etc., complete for
finished item of work in all floors.( APSS No.126

187.12 100.00

8 Supplying and fixing of 100mm dia PVC pipes


for weep holes including material, labour
charges like cutting size, fixing in side wall etc
as directed by Engineer- in- charge

Drain side Wall


PVC pipe 8x 15 0.400

9 Carting of surplus excavated rock/Soil


within a lead of 5Km from the site to a distance
suitable including loading charges, cost &
conveyance, dumping, labour charges and
other incidental and operational charges etc.,
complete.
Total Earth work excavated 70% 348.71
263 of 2191 Culvert

10 Supply and filling, spreading Gravel brought


from approved quarry of good quality including
loading, unloading, conveyance charges, filling
charges, tampingh etc complete as per S.S for
finished item of work.
For side filling
264 of 2191 Culvert

Size

Depth Quantity

3.15 581.18
581.18 Cum

200.00 Hphr

0.20 27.90 Cum


27.90 Cum
265 of 2191 Culvert

0.15 20.93 Cum


20.93 Cum

0.400 50.40
10.00
60.40 Cum
266 of 2191 Culvert

2.400 86.40
1.200 4.32 Cum
90.72 Cum
2.000 36.00
36.00 Cum

kg/Cum 18712.00 kgs

48.00
48.00 mts

348.71 Cum
267 of 2191 Culvert

69.74
69.74 cum
Page 268 of 2191 Lead

KODADA MUNICIPALITY
DATA BASED ON - 2018 - 2019 SSR
Sep-18
Statement showing the cost of Materials for the year 2018-19

Ref.to SSR Machine Deduct for Lead Char


Blasting
crushing Surface
Basic rate charges-
Sl. charges- stone- Total. Lead in
Description Unit excluding Rs.70/
No. Item Rs.25% Rs.9.90 Rs. Km
Seign's [pn.66 Includ'g
No / Pg.No [p.n.66 [p.n.67
sl.no. 36] CP
Sl.No sl.no. 37] sl.no. 38]

1 Fine aggregate Sand for filling 36.c 1 Cum 570.00 570.00 68 Km 832.80
2 Fine aggregate sand for Concrete & Filtering items 36.b 1 Cum 570.00 570.00 68 Km 832.80
3 Fine aggregate sand for Mortar, Plastering & Sand blasting 36.a 1 Cum 760.00 760.00 68 Km 832.80
4 Crushed stone sand / Rock sand 4.75mm to 2.36 mm 94 1 Cum 550.00 550.00 10 Km 125.60
5 Gravel including stacking 34 1 Cum 98.00 98.00 5 Km 57.10
6 Quarry rubbish 35 1 Cum 77.00 77.00 5 Km 57.10
7 Earth Cost or compensation 102 20 1 Cum 65.00 65.00 5 Km 57.10
8 Red earth Cost 102 20 1 Cum 98.00 98.00 5 Km 57.10
B STONE FOR MASONRY WORK 0.00
8 Un Coursed rubble stone 79 14 1 Cum 340.00 340.00 10 Km 126.80
9 Randam Rubble stone 22.g 32 1 Cum 239.00 239.00 10 Km 126.80
10 Coursed rubble stone 23.a 12 1 Cum 249.00 249.00 10 Km 126.80
11 Rough stone 20 x 20 x 75 cm -33 Nos - 25/- 825.00 825.00 10 Km 126.80
12 Bond stones ( 600 x 200 x 200 mm ) - Rs.29/- - 41 Nos 1189.00 1189.00 10 Km 126.80
13 Coursed rubble stone 30 x 30 x 45 cm (Rs-20/each) -24 Nos/m 3 13 12 1 Cum 480.00 67.00 480.00 10 Km 126.80
14 Coursed rubble stone 30 x 30 x 60 cm (Rs-28/each)-18 Nos/m 3 14 12 1 Cum 504.00 67.00 504.00 10 Km 126.80
15 Through stones 20 x 20 x 30 to 45 cm long (Rs-23/each )-55 Nos/m 3 75 14 1 Cum 1265.00 67.00 1265.00 10 Km 126.80
16 Through stones 25 x 25 x 45 to 60 cm long (Rs-39/each)-26 Nos/m 3 76 14 1 Cum 1014.00 67.00 1014.00 10 Km 126.80
17 Through stones 30 x 30 x 65 to 75 cm long (Rs-59/each)-14 Nos/m 3 76 22 1 Cum 826.00 67.00 826.00 10 Km 126.80
18 Crushed stone sand / Rock sand 4.75mm to 2.36 mm 94 33 1 Cum 550.00 67.00 550.00 10 Km 126.80
19 Coarse aggregate 10-4.75 mm 7 17 1 Cum 760.00 67.00 190.00 -9.90 1007.10 10 Km 126.80
Page 269 of 2191 Lead

Ref.to SSR Machine Deduct for Lead Char


Blasting
crushing Surface
Basic rate charges-
Sl. charges- stone- Total. Lead in
Description Unit excluding Rs.70/
No. Item Rs.25% Rs.9.90 Rs. Km
Seign's [pn.66 Includ'g
No / Pg.No [p.n.66 [p.n.67
sl.no. 36] CP
Sl.No sl.no. 37] sl.no. 38]

20 Coarse aggregate 20-10 mm 8 17 1 Cum 990.00 67.00 247.50 -9.90 1294.60 10 Km 126.80
21 Coarse aggregate 40-20 mm 9 17 1 Cum 890.00 67.00 222.50 -9.90 1169.60 10 Km 126.80
22 Coarse aggregate 80-40 mm 10 17 1 Cum 510.00 67.00 127.50 -9.90 694.60 10 Km 126.80
23 Jeddy Stone 450 mm to 600 mm thick 1 Cum 179.00 67.00 44.75 -9.90 280.85 10 Km 126.80
Page 270 of 2191 Lead

Ref.to SSR Machine Deduct for Lead Char


Blasting
crushing Surface
Basic rate charges-
Sl. charges- stone- Total. Lead in
Description Unit excluding Rs.70/
No. Item Rs.25% Rs.9.90 Rs. Km
Seign's [pn.66 Includ'g
No / Pg.No [p.n.66 [p.n.67
sl.no. 36] CP
Sl.No sl.no. 37] sl.no. 38]

Sub - Base Materials - Grainte ( for Road works)-2015-16 SoR 0.00


24 Filter media/Filter Material as per Table 300-3 (MoRT&H M-012 26 1 Cum 345.00 67.00 86.25 -9.90 488.35 10 Km 126.80
25 Specification)
53 mm to 9.5 mm M-013 26 1 Cum 648.00 67.00 162.00 -9.90 867.10 10 Km 126.80
26 37.5 mm to 9.5 mm M-014 26 1 Cum 690.20 67.00 172.55 -9.90 919.85 10 Km 126.80
27 26.5 mm to 9.5 mm M-015 26 1 Cum 732.75 67.00 183.19 -9.90 973.04 10 Km 126.80
28 9.5 mm to 4.75 mm M-016 26 1 Cum 552.50 67.00 138.13 -9.90 747.73 10 Km 126.80
29 9.5 mm to 2.36 mm M-017 26 1 Cum 530.00 67.00 132.50 -9.90 719.60 10 Km 126.80
30 4.75mm to 2.36 mm M-018 26 1 Cum 485.00 67.00 121.25 -9.90 663.35 10 Km 126.80
31 4.75mm to 75 micron M-019 26 1 Cum 489.00 67.00 122.25 -9.90 668.35 10 Km 126.80
32 mm
2.36 mm M-020 26 1 Cum 485.00 67.00 121.25 -9.90 663.35 10 Km 126.80
33 Stone crusher dust finer than 3mm M-021 26 1 Cum 357.00 67.00 89.25 -9.90 503.35 10 Km 126.80
34 2.36 mm & below M-022 26 1 Cum 485.00 67.00 121.25 -9.90 663.35 10 Km 126.80
35 4.75mm to 75 M-023 26 1 Cum 474.00 67.00 118.50 -9.90 649.60 10 Km 126.80
36 micron
4.75 mm mmto 2.36 mm M-024 26 1 Cum 485.00 67.00 121.25 -9.90 663.35 10 Km 126.80
37 9.5 mm to 4.75 mm M-025 26 1 Cum 552.50 67.00 138.13 -9.90 747.73 10 Km 126.80
38 26.5 mm to 4.75 mm M-026 26 1 Cum 650.17 67.00 162.54 -9.90 869.81 10 Km 126.80
39 26.5 mm to 9.5 mm M-027 26 1 Cum 620.00 67.00 155.00 -9.90 832.10 10 Km 126.80
40 37.5 mm to 9.5 mm M-028 26 1 Cum 685.00 67.00 171.25 -9.90 913.35 10 Km 126.80
41 53 mm to 26 .5mm M-029 26 1 Cum 583.33 67.00 145.83 -9.90 786.26 10 Km 126.80
9.5 mm to 4.75 mm 1590.00 67.00 397.50 -9.90 2044.60 10 Km 126.80
25 - 10 mm 733.00 67.00 183.25 -9.90 973.35 10 Km 126.80
10 - 5 mm 553.00 67.00 138.25 -9.90 748.35 10 Km 126.80
5 mm and below 485.00 67.00 121.25 -9.90 663.35 10 Km 126.80
13.2 - 10 mm 660.00 67.00 165.00 -9.90 882.10 10 Km 126.80
25MM- 27 mm 790.00 67.00 197.50 -9.90 1044.60 10 Km 126.80
19MM- 22 mm 821.00 67.00 205.25 -9.90 1083.35 10 Km 126.80
Page 271 of 2191 Lead

Ref.to SSR Machine Deduct for Lead Char


Blasting
crushing Surface
Basic rate charges-
Sl. charges- stone- Total. Lead in
Description Unit excluding Rs.70/
No. Item Rs.25% Rs.9.90 Rs. Km
Seign's [pn.66 Includ'g
No / Pg.No [p.n.66 [p.n.67
sl.no. 36] CP
Sl.No sl.no. 37] sl.no. 38]

12MM- 14 mm 700.00 67.00 175.00 -9.90 932.10 10 Km 126.80


9.5MM- 11.2 mm 620.00 67.00 155.00 -9.90 832.10 10 Km 126.80
5MM- 7 mm 485.00 67.00 121.25 -9.90 663.35 10 Km 126.80
25mm -12mm 770.33 67.00 192.58 -9.90 1020.01 10 Km 126.80
AGGRIGATES -SS.5 - 2018-19 SoR
Aggregates below 5.6 mm M-030 26 1 Cum 557.00 67.00 139.25 -9.90 753.35 10 Km 126.80
Aggregates 22.4 mm to 2.36 mm M-031 26 1 Cum 622.20 67.00 155.55 -9.90 834.85 10 Km 125.60
Aggregates 22.4 mm to 5.6 mm M-032 26 1 Cum 656.50 67.00 164.13 -9.90 877.73 10 Km 126.80
Aggregates 45 mm to 2.8 mm M-033 26 1 Cum 631.57 67.00 157.89 -9.90 846.56 10 Km 126.80
Aggregates 45 mm to 22.4 mm M-034 27 1 Cum 710.33 67.00 177.58 -9.90 945.01 10 Km 126.80
Aggregates 53 mm to 2.8 mm M-035 27 1 Cum 607.63 67.00 151.91 -9.90 816.64 10 Km 126.80
Aggregates 53 mm to 22.4 mm M-036 27 1 Cum 642.75 67.00 160.69 -9.90 860.54 10 Km 126.80
Aggregates 63 mm to 2.8 mm M-037 27 1 Cum 584.56 67.00 146.14 -9.90 787.80 10 Km 126.80
Aggregates 63 mm to 45 mm M-038 27 1 Cum 453.33 67.00 113.33 -9.90 623.76 10 Km 126.80
Aggregates 90 mm to 45 mm M-039 27 1 Cum 402.00 67.00 100.50 -9.90 559.60 10 Km 126.80
Aggregates 10 mm to 5 mm M-040 27 1 Cum 552.50 67.00 138.13 -9.90 747.73 10 Km 126.80
Aggregates 11.2 mm to 0.09 mm M-041 27 1 Cum 530.00 67.00 132.50 -9.90 719.60 10 Km 126.80
Aggregates 13.2 mm to 0.09 mm M-042 27 1 Cum 572.50 67.00 143.13 -9.90 772.73 10 Km 126.80
Aggregates 13.2 mm to 5.6 mm M-043 27 1 Cum 601.67 67.00 150.42 -9.90 809.19 10 Km 126.80
Aggregates 13.2 mm to 10 mm M-044 27 1 Cum 660.00 67.00 165.00 -9.90 882.10 10 Km 126.80
Aggregates 20 mm to 10 mm M-045 27 1 Cum 713.67 67.00 178.42 -9.90 949.19 10 Km 126.80
Aggregates 25 mm to 10 mm M-046 27 1 Cum 732.75 67.00 183.19 -9.90 973.04 10 Km 126.80
Aggregates 19 mm to 6 mm M-047 27 1 Cum 656.50 67.00 164.13 -9.90 877.73 10 Km 126.80
Aggregates 37.5 mm to 19 mm M-048 27 1 Cum 805.50 67.00 201.38 -9.90 1063.98 10 Km 126.80
Aggregates 37.5 mm to 25 mm M-049 27 1 Cum 790.00 67.00 197.50 -9.90 1044.60 10 Km 126.80
Aggregates 13.2/12.5 mm nominal size M-050 27 1 Cum 700.00 67.00 175.00 -9.90 932.10 10 Km 126.80
Page 272 of 2191 Lead

Ref.to SSR Machine Deduct for Lead Char


Blasting
crushing Surface
Basic rate charges-
Sl. charges- stone- Total. Lead in
Description Unit excluding Rs.70/
No. Item Rs.25% Rs.9.90 Rs. Km
Seign's [pn.66 Includ'g
No / Pg.No [p.n.66 [p.n.67
sl.no. 36] CP
Sl.No sl.no. 37] sl.no. 38]

IRC & MORTH AGGREGATE : ( GARNITE, TRAP, DOLERITE ANDDOLAMITE) 0.00


42 2.36 to 5 mm size 33.a 26 1 Cum 485.00 67.00 121.25 -9.90 663.35 10 Km 126.80
43 5 to 7mm size 33.b 26 1 Cum 485.00 67.00 121.25 -9.90 663.35 10 Km 126.80
44 9.5 to 11.2mm size 33.c 26 1 Cum 620.00 67.00 155.00 -9.90 832.10 10 Km 126.80
45 12mm to 14 mm size 33.d 26 1 Cum 700.00 67.00 175.00 -9.90 932.10 10 Km 126.80
46 19 mm to 22 mm size 33.e 26 1 Cum 821.00 67.00 205.25 -9.90 1083.35 10 Km 126.80
47 25 mm to 27 mm size 33.f 26 1 Cum 790.00 67.00 197.50 -9.90 1044.60 10 Km 126.80
48 40 mm to 45 mm size 33.g 26 1 Cum 520.00 67.00 130.00 -9.90 707.10 10 Km 126.80
49 50 mm to 55 mm size 33.h 26 1 Cum 440.00 67.00 110.00 -9.90 607.10 10 Km 126.80
50 60 mm to 63 mm size 33.i 26 1 Cum 400.00 67.00 100.00 -9.90 557.10 10 Km 126.80
51 65 mm size 33.j 26 1 Cum 360.00 67.00 90.00 -9.90 507.10 10 Km 126.80
52 75 mm size 33.k 26 1 Cum 290.00 67.00 72.50 -9.90 419.60 10 Km 126.80
HARD BROKEN STONE OF GRANITE, TRAP AND DOLERITE AS PER -IS 383,1970 0.00
53 6mm size 33.a 26 1 Cum 505.00 67.00 126.25 -9.90 688.35 10.00 126.80
54 10mm size -(IS383,1970 33.b 26 1 Cum 657.00 67.00 164.25 -9.90 878.35 10.00 126.80
55 12mm size - (IS383,1970 33.c 26 1 Cum 781.00 67.00 195.25 -9.90 1033.35 10.00 126.80
56 20mm size - (IS383,1970 33.d 26 1 Cum 870.00 67.00 217.50 -9.90 1144.60 10.00 126.80
20mm graded metal ( 20mm-70%,12mm-10%,10mm-10%,6mm- 0.00
57 10%)
25mm size - (IS383,1970 33.e 27 1 Cum 830.00 67.00 207.50 -9.90 1094.60 10.00 126.80
58 40mm size - (IS383,1970 33.f 27 1 Cum 505.00 67.00 126.25 -9.90 688.35 10.00 126.80
59 50mm size - (IS383,1970 33.g 27 1 Cum 433.00 67.00 108.25 -9.90 598.35 10.00 126.80
60 60mm size - (IS383,1970 33.h 27 1 Cum 398.00 67.00 99.50 -9.90 554.60 10.00 126.80
61 65mm size - (IS383,1970 33.i 27 1 Cum 360.00 67.00 90.00 -9.90 507.10 10.00 126.80
62 75mm size - (IS383,1970 33.j 27 1 Cum 289.00 67.00 72.25 -9.90 418.35 10.00 126.80
63 75 to 100mm size - (IS383,1970 33.k 27 1 Cum 236.00 67.00 59.00 -9.90 352.10 10.00 126.80
64 Soling stone of 150 mm size of granite, trap and Dolamite 33.Z3 1 Cum 90.00 67.00 -9.90 147.10 10.00 126.80
varieties.
Page 273 of 2191 Lead

Ref.to SSR Machine Deduct for Lead Char


Blasting
crushing Surface
Basic rate charges-
Sl. charges- stone- Total. Lead in
Description Unit excluding Rs.70/
No. Item Rs.25% Rs.9.90 Rs. Km
Seign's [pn.66 Includ'g
No / Pg.No [p.n.66 [p.n.67
sl.no. 36] CP
Sl.No sl.no. 37] sl.no. 38]

BRICKS 0.00
65 Bricks (23 x11 x 7 cm) 2nd class -Non Modular TBSC-A.I-01 1 Nos 5.70 5.70 0.00
66 Modular Bricks 19 x 9 x 9 cms TBSC-A.I-02 1 Nos 6.70 6.70 0.00
67 Fly ash cement / lime solid blocks of 75 kg/sq.cm -290 x 225 x 140 TBSC-A.II-01 1 Nos 25.00 25.00 0.00
mm
68 Fly ash cement / lime solid blocks of 75 kg/sq.cm -290 x 200 x 140 TBSC-A.II-02 1 Nos 23.00 23.00 0.00
mm
69 Fly ash cement / lime solid blocks of 75 kg/sq.cm -290 x 150 x 140 TBSC-A.II-03 1 Nos 20.00 20.00 0.00
mm
70 Fly ash cement / lime solid blocks of 75 kg/sq.cm -290 x 112 / 100 x TBSC-A.II-04 1 Nos 14.00 14.00 0.00
140 mm
71 Fly ash cement / lime solid blocks of 75 kg/sq.cm -225 x 100 x 60 TBSC-A.II-05 1 Nos 8.00 8.00 0.00
mm
72 Fly ash cement / lime solid blocks of 75 kg/sq.cm - 145 x 225 x 140 TBSC-A.II-06 1 Nos 15.00 15.00 0.00
mm
73 Fly ash cement / lime solid blocks of 75 kg/sq.cm -145 x 200 x 140 TBSC-A.II-07 1 Nos 12.00 12.00 0.00
mm
72 Fly ash cement / lime solid blocks of 50 kg/sq.cm -290 x 225 x 140 TBSC-A.II-08 1 Nos 24.00 24.00 0.00
mm
73 Fly ash cement / lime solid blocks of 50 kg/sq.cm -290 x 200 x 140 TBSC-A.II-09 1 Nos 19.00 19.00 0.00
mm
74 Fly ash cement / lime solid blocks of 50 kg/sq.cm -290 x 150 x 140 TBSC-A.II-10 1 Nos 20.00 20.00 0.00
mm
Page 274 of 2191 Lead

Ref.to SSR Machine Deduct for Lead Char


Blasting
crushing Surface
Basic rate charges-
Sl. charges- stone- Total. Lead in
Description Unit excluding Rs.70/
No. Item Rs.25% Rs.9.90 Rs. Km
Seign's [pn.66 Includ'g
No / Pg.No [p.n.66 [p.n.67
sl.no. 36] CP
Sl.No sl.no. 37] sl.no. 38]

75 Fly ash cement / lime solid blocks of 50 kg/sq.cm -290 x 112 / 100 x TBSC-A.II-11 1 Nos 11.00 11.00 0.00
140 mm
76 Fly ash cement / lime solid blocks of 50 kg/sq.cm -225 x 100 x 60 TBSC-A.II-12 1 Nos 6.00 6.00 0.00
mm
77 Fly ash cement / lime solid blocks of 50 kg/sq.cm - 145 x 225 x 140 TBSC-A.II-06 1 Nos 12.00 12.00 0.00
mm
78 Fly ash cement / lime solid blocks of 50 kg/sq.cm -145 x 200 x 140 TBSC-A.II-07 1 Nos 11.00 11.00 0.00
mm
1 The aggregate rates are inclusive of blasting charges of Rs.70/cum and 25% machine crushing charges. However , if the metal is obtained from hand broken , the blasting and cru
be deducted. The aggregate shall be HB Stone of Granite, Dolamite, Dolerite and Trap.( Quartzite and Basalt with aggregate Impact of Less than 20)

2 Seignorage charges vide GO Ms.No.67, Dt. 26-09-2015


BITUMEN RATES
Basic Sub- Lead in
CED @ GST @
Sno Cost Total Km
Materials
.
0.00% 18.00%

1 Bitumen 80/ 100 grade bulk at chennai ( VG-10 ) 32430 0 32430 0.00 chennai 545
2 Bitumen 60/70 grade bulk at chennai ( VG- 30 ) 37620 0 37620 0.00 chennai 545
3 Bitumen emulsion -RS (Rapid setting) - Bulk chennai 29280 0 29280 0.00 chennai 545
4 Bitumen emulsion -RS-1 (Rapid setting) - Bulk 26804 0 26804 0.00 Irrungattukottai 653
5 Bitumen emulsion -RS-2 (Rapid setting) - Bulk 27781 0 27781 0.00 Irrungattukottai 653
6 Bitumen emulsion -MS-(Medium setting) at Haldia - Bulk 26140 0 26140 0.00 Haldia 653
7 Bitumen emulsion -SS (Slow setting) - Bulk 26495 0 26495 0.00 Irrungattukottai 653
8 Bitumen emulsion -SS-1 (Slow setting) -chennai - Bulk 44800 0 44800 0.00 chennai 545
9 Bitumen emulsion -SS-2 (Slow setting) -chennai - Bulk 30940 0 30940 0.00 chennai 545
Note: Bitumen rate based on the HPCL -Price List for Oct-2017 and Emulsion rate based on Hindusthan Coal price list for Oct-17
Page 275 of 2191 Lead

Ref.to SSR Machine Deduct for Lead Char


Blasting
crushing Surface
Basic rate charges-
Sl. charges- stone- Total. Lead in
Description Unit excluding Rs.70/
No. Item Rs.25% Rs.9.90 Rs. Km
Seign's [pn.66 Includ'g
No / Pg.No [p.n.66 [p.n.67
sl.no. 36] CP
Sl.No sl.no. 37] sl.no. 38]

70% of 20mm metal 0.70 1256.20 879.34


10% of 12mm metal 0.10 1144.95 114.50
10% of 10mm metal 0.10 989.95 99.00
10% of 6mm metal 0.10 799.95 80.00
1172.83
Page 276 of 2191 Lead

MUNICIPALITY
ON - 2018 - 2019 SSR
Sep-18
t of Materials for the year 2018-19

Lead Charges

Total cost
in Rs.
Exclud'g
CP

733.00 1303.00
733.00 1303.00
733.00 1493.00
110.55 660.55
50.26 148.26
50.26 127.26
50.26 115.26
50.26 148.26

111.60 451.60
111.60 350.60
111.60 360.60
111.60 936.60
111.60 1300.60
111.60 591.60
111.60 615.60
111.60 1376.60
111.60 1125.60
111.60 937.60
111.60 661.60
111.60 1118.70
Page 277 of 2191 Lead

Lead Charges

Total cost
in Rs.
Exclud'g
CP

111.60 1406.20
111.60 1281.20
111.60 806.20
111.60 392.45
Page 278 of 2191 Lead

Lead Charges

Total cost
in Rs.
Exclud'g
CP

111.60 599.95
111.60 978.70
111.60 1031.45
111.60 1084.64
111.60 859.33
111.60 831.20
111.60 774.95
111.60 779.95
111.60 774.95
111.60 614.95
111.60 774.95
111.60 761.20
111.60 774.95
111.60 859.33
111.60 981.41
111.60 943.70
111.60 1024.95
111.60 897.86
111.60 2156.20
111.60 1084.95
111.60 859.95
111.60 774.95
111.60 993.70
111.60 1156.20
111.60 1194.95
Page 279 of 2191 Lead

Lead Charges

Total cost
in Rs.
Exclud'g
CP

111.60 1043.70
111.60 943.70
111.60 774.95
111.60 1131.61

111.60 864.95
110.55 945.40
111.60 989.33
111.60 958.16
111.60 1056.61
111.60 928.24
111.60 972.14
111.60 899.40
111.60 735.36
111.60 671.20
111.60 859.33
111.60 831.20
111.60 884.33
111.60 920.79
111.60 993.70
111.60 1060.79
111.60 1084.64
111.60 989.33
111.60 1175.58
111.60 1156.20
111.60 1043.70
Page 280 of 2191 Lead

Lead Charges

Total cost
in Rs.
Exclud'g
CP

111.60 774.95
111.60 774.95
111.60 943.70
111.60 1043.70
111.60 1194.95
111.60 1156.20
111.60 818.70
111.60 718.70
111.60 668.70
111.60 618.70
111.60 531.20

111.60 799.95
111.60 989.95
111.60 1144.95
111.60 1256.20
1172.83
111.60 1206.20
111.60 799.95
111.60 709.95
111.60 666.20
111.60 618.70
111.60 529.95
111.60 463.70
111.60 258.70
Page 281 of 2191 Lead

Lead Charges

Total cost
in Rs.
Exclud'g
CP

0.00 5.70
0.00 6.70
0.00 25.00
0.00 23.00
0.00 20.00
0.00 14.00
0.00 8.00
0.00 15.00
0.00 12.00
0.00 24.00
0.00 19.00

0.00 20.00
Page 282 of 2191 Lead

Lead Charges

Total cost
in Rs.
Exclud'g
CP

0.00 11.00
0.00 6.00
0.00 12.00
0.00 11.00
ng charges. However , if the metal is obtained from hand broken , the blasting and crushing charges shall
zite and Basalt with aggregate Impact of Less than 20)

MEN RATES
Lead
Charges Total cost
in Rs./ 1 MT
Incl. CP

817.50 33247.50
817.50 38437.50
817.50 30097.50
979.50 27783.50
979.50 28760.50
979.50 27119.50
979.50 27474.50
817.50 45617.50
817.50 31757.50
on Hindusthan Coal price list for Oct-17
KODADA MUNICIPALITY
DATA BASED ON SSR 2018-19 ( BASED ON MoRTH 5th Revision )

Name of Work :- Construction of Divider and central lighting

Quantity Description of Item Rate per


RBR-EECD-

1 Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and
05

loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and
cross-sections, and transporting to the embankment location with all lifts and lead upto 1000 m as per
Technical Specification Clause 302.3 MORD / 301 MORTH

Unit = cum
Taking output = 360 cum
a) Labour
0 day Mate 510.00 day
2.080 day Mazdoor (Unskilled) 510.00 day
20% Add 20% MA on Labour charges
b) Machinery
3.60 hour Hydraulic excavator 0.9 cum bucket capacity @ 100 cum/ 2967.90 hour
hour

3.60 hour Add labour allowance on crew charges @ 0.00 hour


15.00 hour Tipper 5.5 cum capacity, 4 trips per hour 1004.40 hour

15.00 hour Add labour allowance on crew charges @ 0.00 hour

13.615% c&d) Overheads & Contractors Profit


Cost for 360 cum = a+b+c+d
Rate per cum = (a+b+c+d)/360
RBR-EECD-16

2 Loosening of the ground upto a level of 300 mm below the


subgrade level, watered, graded and compacted in layers to
meet requirement of Tables 300.1 and 300.2 for subgrade
construction as per Technical Specification Clause 303.5.2
MORD / 305 MORTH.

ii Unit = cum
Taking output = 600 cum
a) Labour
day Mate 540.00 day
3.120 day Mazdoor (Unskilled) 510.00 day

b) Machinery
9.000 hour Tractor with Tipper attachment 568.232
6.000 hour Motor grader for grading 3601.92
4.000 hour Water tanker 6 kl capacity 698.88
8.600 hour Three wheel 80-100 kN Static Roller @70 cum per hour
OR
7.500 hour Vibratory road roller 8-10 tonnes @ 80 cum per hour 2878.90

Road data- MoRTH-5th Revision 447524687.xlsx 283


Quantity Description of Item Rate per
c) Material
24.000 kl Water 98.00

13.615% d&e) Overheads & Contractors Profit


Cost for 600 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/600
3 Conveyance of excavated earth up to 5.00km lead
including loading and unloading etc
5KMS conveyance charges
Dedcut 1km lead
Loading charges

Per 1Cum
5 Construction of Granular sub-base by providing well graded/ close graded HBG material confirming to Grading
Table 400-1 including cost and conveyance of all materials to work site and spreading in uniform layers with motor g
or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at
and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as
MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge.

Grading-III ( For CBR value 20%)


I) Mix in place method
Unit = Cum
Taking output = 300 cum
(A) Labour
0.48 day Mate 0.00 day
2.40 day Mazdoor skilled 540.00 day
8.00 day Mazdoor unskilled 510.00 day
Total
(B) Machinery
6.00 hr Motor grader 3.35M Blade @50 cum/Hr 3601.92 hr
12.00 hr Tractor with Rotavator 472.64 hr
3.00 hr Water tanker 6 KL 698.88 hr
6.00 hr Vibratory roller 8T 2878.90 hr
6.00 hr labour allowance on crew charges 0.00
or
30.00 hr Three wheel 80-100 kN static roller @ 10 cum per hour 2878.90
30.00 hr labour allowance on crew charges 296.40
Total
(C) Material
Granular sub-base material as per Table 400-1 of MORT&H
134.40 cum 9.5 mm to 4.75 mm @ 35 per cent 859.33 Cum
48.00 cum 4.75 mm to 2.36 mm @ 12.5 per cent 774.95 Cum
201.60 2.36 mm below @ 52.5 per cent 774.95 Cum
18.00 kl Water 98.00 kl
Total
Rate per 300 Cum
13.615% c&d) Overheads & Contractors Profit

Rate per 1 cum

Road data- MoRTH-5th Revision 447524687.xlsx 284


Quantity Description of Item Rate per
8 Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadem specifica
5th Revision) as per Table 400-13, including cost of all materials and including premixing the material with wa
OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with paver in
courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directe
the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work.

Unit = cum
Taking output = 225 cum
(A) Labour
0.48 nos. Mate 0.00 day
2.00 nos. Mazdoor skilled 540.00 day
10.00 nos. Mazdoor 510.00 day
Total
(B) Machinery
9.00 hr Wet mix plant of 75 tonne hr. capacity 1843.52 hr
6.00 hr Electric generating set 125 KVA 1478.40 hr
6.00 hr front end loader 1 cum capacity 1843.52 hr
6.00 hr Mechanical Paver finisher 100 TPH 2518.88 hr
3.90 hr Vibratory roller 8-10 T 2878.90 hr
3.00 hr Water tanker 698.88 hr
7920.00 Tkm Tipper (495Tonnes* 16kms) 6.00 Tkl
Total
(C) Material
89.10 cum 45 to 22.40mm IRC&MoRT&H HBG M/C metal@ 30% 1056.61 cum
118.80 cum 22.4 to 2.36 mm IRC&MoRT&H HBG M/C metal@40% 945.40 cum
89.10 cum 2.36 mm to 75 micron @ 30% (2.36mm & below) 774.95 cum
18.00 kl Water 98.00 kl
Total
Rate per 225 Cum
13.615% c&d) Overheads & Contractors Profit

Rate per 1 cum

9 Providing and applying prime coat with bitumen emulsion (SS2) Bulk using emulsion pressure distributor on prep
surface of granular base including clearing of road surface and spraying emulsion at the rate of 0.60 kg/sqm
emulsion pressure distributor for finished item of work etc., complete as per MoRT&H Specification 502 (5th revision
as directed by the Engineer-in-charge
Unit = Sqm
Taking output = 3500 sqm
a) Labour
0.080 day Mate 540.00 day
2.000 day Mazdoor 510.00 day

b) Machinery
2.800 hr Mechanical broom @ 1250 sqm per hour 399.84 hour
2.800 hr Air compressor 250 cfm 588.40 hour
2.000 hr Emulsion pressure distributor @ 1750 sqm per hour 963.20 hour
1.000 hr Water tanker 6 KL capacity @ 1 trip per hour 698.88 hour

c) Material
2.100 MT Bitumen emulsion @ 0.6 kg per sqm 45617.50 MT
6.000 Kl Cost of water 98.00 kl

a+b+c
Rate per 3500 Sqm
13.615% c&d) Overheads & Contractors Profit

Road data- MoRTH-5th Revision 447524687.xlsx 285


Quantity Description of Item Rate per

Rate per 1 Sqm

10 Providing and applying tack coat with bitumen Emulsion (RS1) (Bulk) using Emulsion pressure distributor at the ra
0.20 kgs per sqm on the prepared bituminous surface cleaned with mechanical broom for finished item of work a
MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.

unit = Sqm
Taking output = 3500 sqm
(A) Labour
0.08 nos Mate 540.00 day
2.00 nos Mazdoor 510.00 day
Total
(B) Machinery
2.80 hr Mechanical broom Hydraulic @ 1250 sqm/hr. 399.84 hr
2.80 hr Air compressor 250 cfm 588.40 hr
2.00 hr Emulsion pressure distributor @1750 sqm/hr 963.20 hr
Total
(C) Material
0.70 MT Bitumen Emulsion @ 0.20 Kgs/sqm 30097.50 MT
Total
a+b+c
Rate per 3500 Sqm
13.615% c&d) Overheads & Contractors Profit

Rate per 1 Sqm

13 Providing and laying of Bituminous Macadam with 100 -120 TPH hot mix plant producing an average output
tonnes per hour using hard blasted granite crushed aggregates of Grading - II as per table 500-7 of MoR
specificaion 504 (5th Revision) premixed with bituminous binder of VG-30 grade @ 3.4 % by weight of total mix
transported to site, laid over a previously prepared surface with Hydrostatic paver finisher with sensor control t
required grade, level and alignment and rolled as per Clauses 501.6 and 501.7 to achieve the desired compactio
finished item of work as directed by the Engineer-in-Charge including hire and opeational charges all T&P and all
contingent charges necessary , complete and as per MoRTH specification No. 504 (5th Revision) .

Unit = cum Page 125,126,127 of MoRT&H SDB


Taking out put = 205 cum (450 tonne)
(A) Labour
0.84 nos. Mate 540.00 nos.
16.00 nos. Mazdoor working with HMP, mechanical broom, paver, roller, 510.00 nos.
asphalt cutter and assistance for setting out lines, levels and
layout of construction
5.00 nos. Mazdoor skilled 540.00 nos.
Total
(B) Machinery
6.00 hr Batch mix Hot mix plant @ 100 - 120 TPH 27071.52 hr
2.20 hr Air Compressor 250 cfm 588.40 hr
6.00 hr Hydrostatic Paver finisher with sensor control 3426.65 hr
6.00 hr Generator 250 KVA 2072.00 hr
6.00 hr Front end loader 1 cum bucket capacity 1843.52 hr
3.90 hr Smooth wheeled roller 8-10 tonnes for initial break down 1342.30 hr
rolling
3.90 hr Vibratory roller 8 tonnes for intermediate rolling 2878.90 hr
3.90 hr Finish rolling with 6-8 tonnes smooth wheeled tandem roller. 1843.52 hr

7200.00 TKl Tipper @16 6.00 TKl

Road data- MoRTH-5th Revision 447524687.xlsx 286


Quantity Description of Item Rate per
Total
(C) Material
15.30 MT Bitumen VG-30 @ 3.4 % of weight of mix = 205x2.2=450 38437.50 MT
tonne

ii) Aggregate
Total weight of mix = 450 tonnes
weight of bitumen - 15.3 tonnes
Weight of aggregate = 450-15.3 = 434.7 tonnes
Taking density of aggregate = 1.5 tonne/cum
Volume of aggregate = 289.8 cum
Grading - II (19 mm nominal size)
116.04 Cum of 25-10mm @ 40%
115.92 cum IRC & MORT&H HBG M/C chips 25 to 10mm @ 40% 1084.64 cum
115.92 cum IRC &MORT&H HBG M/C chips 10 to 5mm @ 40% 859.33 cum
57.96 cum IRC &MORT&H HBG M/C chips 5mm and below @ 20% 864.95 cum
Total
Rate per 205 Cum
13.615% c&d) Overheads & Contractors Profit

Rate per 1 Cum

14 Providing and laying of Dense Graded Bituminous Macadam with 100 - 120 TPH batch type hot mix plant producin
average output of 75 tones per hour using hard blasted granite crushed aggregates of Grading - II as per table 50
of MoRT&H Specification 505 (5th revision) premixed with bituminous binder of VG 30 grade @ 4.50% of weight of
mixture, transported to site, laid over a previously prepared surface with a hydrostatic paver finisher with sensor cont
the required grade, level and alignment and rolled as per Clauses 501.6 and 501.7 to achieve the desired compactio
finished item of work as directed by the Engineer-in-Charge including hire and operational charges all T&P and all
contingent charges necessary including cost of (excluding seigniorage) charges of all materials etc., complete
respects as directed by Engineer-in-Charge and as per MoRT&H specification No. 505 (5th Revision)

Page 132,133 of MoRT&H SDB


Unit = cum
Taking out put = 195 cum (450 ton)
(A) Labour

Road data- MoRTH-5th Revision 447524687.xlsx 287


Quantity Description of Item Rate per
0.84 nos. Mate 540.00 nos.
16.00 nos. Mazdoor working with HMP, mechanical broom, paver, roller, 510.00 nos.
asphalt cutter and assistance for setting out lines, levels and
layout of construction.
5.00 nos. Mazdoor skilled 540.00 nos.
TOTAL
(B) Machinery
6.00 hour Batch mix Hot Mix Plant @ 75 Tonne per hour 27071.52 hour
6.00 hour Paver finisher hydrostatic with sensor control 3426.65 hour
6.00 hour Generator 250 KVA 2072.00 hour
6.00 hour Front end loader 1 cum bucket capacity 1843.52 hour
3.90 hour Smooth wheeled roller 8-10 tonesfor initial break down rolling 1342.30 hour

3.90 hour Vibratory roller 8 tones for intermediate rolling 2878.90 hour
3.90 hour Finish rolling with 6-8 tones smooth wheeled tandem roller 1843.52 hour
7200.00 TKl Tipper 6.00 TKl
TOTAL B=
(C) Material
20.25 MT Wt. of Bitumen = 450 x 4.5/100 = 20.25 MT 38437.50 1.00
ii) Aggregate
TOTAL weight of mix = 450 tones
weight of bitumen = 450*4.5 / 100 = 20.25 tones
Weight of aggregate = 450-20.25 = 429.75 tones
Taking density of aggregate = 1.5 ton/cum
Volume of aggregate = 286.50 cum
Grading - II (19 mm nominal size)
85.95 cum IRC & MORT&H HBG M/C chips 25-10 mm @ 30 % 1084.64 cum
80.22 cum IRC & MORT&H HBG M/c Chips 10 - 5 mm @ 28 % 859.33 cum
114.60 cum IRC & MoRTH HBG M/C Chips 5mm & below @ 40 % 864.95 cum
5.73 cum Filler @ 2% of weight of aggregates. 614.95 cum
TOTAL C=
(A + B +C)
Rate per 195 Cum
13.615% c&d) Overheads & Contractors Profit

Rate per 1 Cum

15 Providing and laying of Bituminous Concrete with 100 - 120 TPH batch type hot mix plant producing an average o
of 75 tones per hour using hard blasted granite crushed aggregates of Grading – II as per Table 500-17 of specific
507 of MoRT&H (5th revision), premixed with Bituminous binder of VG 30 Grade @ 5.4 % of mix and filler, transpo
the hot mix to work site, laying with hydrostatic sensor paver finisher to the required grade, level and alignment, r
with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification
(5th revision) complete for finished item of work in all respects as directed by Engineer-in-Charge

Page 138,139,140 of MoRT&H SDB


Unit = cum
Taking output = 191 cum (450 tones.)
(A) Labour
0.84 nos. Mate 540.00 nos.
16.00 nos. Mazdoor working with HMP, Mechanical broom, paver, roller, 510.00 nos.
asphalt cutter and assistance for setting outlines, levels and
layout of construction.

Road data- MoRTH-5th Revision 447524687.xlsx 288


Quantity Description of Item Rate per
5.00 nos. Skilled Mazdoor for checking line and levels. 540.00 nos.
TOTAL A=
(B) Machinery
6.00 hour Batch mix Hot Mix Plant @ 75 Tonne per hour 27071.52 hour
6.00 hour Paver finisher hydrostatic with sensor control 3426.65 hour
6.00 hour Generator 250 KVA 2072.00 hour
6.00 hour Front end loader 1 cum capacity 1843.52 hour
3.90 hour Power road roller 8 ton for initial break down rolling 1342.30 hour
3.90 hour Vibratory roller 8 ton for intermediate rolling 2878.90 hour
3.90 hour Finish rolling with 6-8 ton. smooth wheeled tandem roller 1843.52 hour
TOTAL B=
(C) Material
Bitumen VG 30 @ 5.40 %
24.30 MT Wi. of Bitumen = 450 x 5.4 / 100 = 24.30 MT 38437.50 MT
ii) Aggregate
TOTAL weight of mix = 450 tones
Weight of bitumen - 24.30 tones
Weight of aggregate = 450-24.30 = 425.70 tones
Taking density of aggregate = 1.5 ton/cum
Volume of aggregate = 283.8 cum
Grading - II (13 mm nominal size)
85.14 cum IRC & MORT&H HBG M/C chips 13.2-10 mm @30% - 993.70 cum
70.95 cum IRC & MORTH HBG M/C Chips 10 - 5 mm @ 25 % - 859.33 cum
122.034 cum IRC & MORTH HBG M/C Chips 5 mm & below @ 43% 864.95 cum
5.676 cum Filler @ 2% of weight of aggregates. 614.95 cum
TOTAL C=
(A + B +C)
Rate per 191 Cum
13.615% c&d) Overheads & Contractors Profit

Rate per 1 Cum

16 Providing , laying of close graded premix surfacing material ( Mixed seal surfacing) of 20 mm thickness by ho
plant using hard blasted granite crushed aggregates of 13.2 mm to 0.09 mm (Type 'B') as per table 500-1
specification 508 of MoRT&H (5th Revision), premixed with bituminous binder VG-30 (60/70) grade @ 19.00 Kg p
Sqm area, including cost of all materials and transporting the hot mix to work site, laying with mechanical paver fin
to the required grade, level and alignment, rolling with smooth wheeled roller 8 to 10 Tonnes as per MoRT&H
Revision) Specification No. 508 complete for finished item of work in all respects as directed by Engineer-in-charge.

Unit = sqm Page 146,147 of MoRT&H SDB


0 sqm (205 cum)
(A) Labour
0.84 nos. Mate 540.00 day
14.00 nos. Mazdoor working with HMP, road sweeper, paver and roller 510.00 day

5.00 nos. Skilled Mazdoor for checking line and levels. 540.00 day
Total
(B) Machinary
12.00 hr Hot mix plant 40 to 60 TPH 21414.40 hr
6.00 hr Generator 250 KVA 2072.00 hr
6.00 hr Front end loader 1 cum capacity 1843.52 hr
6.00 hr Paver finisher hydrostatic with sensor control 3426.65 hr
6.00 hr Smooth wheeled roller 8-10 Tonnes 1342.30 hr

Road data- MoRTH-5th Revision 447524687.xlsx 289


Quantity Description of Item Rate per
Total
(C) Material
19.475 M.T (i) Bitumen VG-30 Grade @ 19.00 kg per 10 sqm 38437.50 MT
(ii) Aggregate
276.75 cum For Type 'B' HBG M/C aggregates 13.2mm to 0.09mm @ 884.33 cum
0.27 cum per 10 sqm
Total
Rate per 10250 Sqm
13.615% c&d) Overheads & Contractors Profit

Rate per 1 Sqm

17 Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone aggregate and fine aggre
conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, cente
machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P
complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed b
Engineer-in-Charge for base coarse below CC Pavement.

Unit = cum
Taking output = 15 cum
(A) Labour
0.64 nos Mate 540.00 day
1.00 nos Mason 540.00 day
15.00 nos Mazdoor 510.00 day
Total
(B) Material
13.50 cum Cost of 40mm SS-5 HBG M/C metal 799.95 cum
6.75 cum Sand 1303.00 cum
2.43 MT Cement at site 4600.00 MT
Total
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
2.00 hr Water tanker 6 KL 698.88 hr
Total
Rate per 15 Cum
13.615% c&d) Overheads & Contractors Profit

Rate per 1 Cum

18 Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone aggregate and fine aggre
conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, cente
machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P
complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed b
Engineer-in-Charge for base coarse below CC Pavement.
Unit = Page331of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.64 nos Mate 540.00 day
1.00 nos Mason 540.00 day
15.00 nos Mazdoor 510.00 day
Total
(B) Material
13.50 cum Cost of 40mm SS-5 HBG M/C metal 799.95 cum
6.75 cum Sand 1303.00 cum
3.45 MT Cement at site 4600.00 MT
Total
© Machinery

Road data- MoRTH-5th Revision 447524687.xlsx 290


Quantity Description of Item Rate per
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
2.00 hr Water tanker 6 KL 698.88 hr
Total
Rate per 15 Cum
13.615% c&d) Overheads & Contractors Profit

Rate per 1 Cum

1 RBR-CCPV-5: Construction of un-reinforced, plain cement concrete pavement, thickness as per design, ov
prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and
aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and approp
weigh batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing o
mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the con
with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation inclu
provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, near approa
to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, c
compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification C
1501 MORD.

Unit = cum
75.00 Cum Taking output = 75 cum (172.50 t)
(100 x 3.75 x 0.200)
a)  Labour
0.00 day Mate 0
5.00 day Mason (1st class) 564
5.00 day Mason (2nd class) 540
150.00 day Mazdoor (Unskilled) 510
6.00 day Mazdoor (Skilled) 540
2.00 day Surveyor 0
6.00 day Mazdoor (Semi-Skilled) 510
1.00 day Blacksmith for cutting of dowel bars including removal of 0
burrs, fabrications & fixing of dowel bars.
b) Machinery
36.00 hour Concrete mixer 0.28 / 0.4 cum capacity (6 mixers) with weigh 397.5
batcher and suitable capacity calibrated water tank
9.00 hour Needle vibrator 0
9.00 hour Screed vibrator 0
9.00 hour Plate vibrator 374.2
4.00 hour Concrete joint cutting machine for initial & final cuts 0
5.00 hour Water tanker 6 kl capacity 698.88
2.00 hour Air Compressor (1 hour initial + 1 hour final) 0
c) Material
67.50 cum Crushed stone coarse aggregates, grading will be as per 1131.61
Clause 1501.2.4.1 (Table 1500.1) of specifications @ 0.90
cum/cum of concrete (25 mm & 12.5 mm blending)

33.75 cum Sand as per IS:383 and conforming to Clause 1500.2.4.2 @ 1303.00
0.45 cum/cum of concrete
26.25 t Cement @ 310 kg/cum of concrete 4750
412.50 sqm Polythene sheet 125 micron(ply) 17
Mild steel dowel bar 25 mm dia of grade S 240. 500 mm long
20 Nos. at culvert/bridge slab and at construction joint
including 5 per cent wastage.
0.118 t (4 x 20 x 0.500) + 5 per cent wastage = 42 m @ 2.80 kg per 0
m = 117.6 kg.
5.00 kg Bitumen primer @ 200 ml per joint for 23 joints -BMT-H.94 0

19.00 litre Bituminous sealant 800 ml per joint for 23 joints 600
Road data- MoRTH-5th Revision 447524687.xlsx 291
Quantity Description of Item Rate per
90.00 m Jute rope 12 mm dia including 5 per cent wastage 8.3
90.00 m Debonding strips 3.75 m (length) x 10 mm (width) x 5 mm 10
(thick) cut-out of rubber filler board or similar material
including 5 per cent wastage
483.00 No. Polythene sheathing, covering 2/3rd dowel bars (20x23) and 0
tight fit including 5 per cent wastage
122.00 litre Plasticizer 0.5 per cent by weight of cement - BMT-H.64 0
131.25 litre Curing compound (if used) @ 0.33 litre per sqm 0
18.00 kl Water for curing 0
3.00 sqm Joint filler board 20 mm thick as per IS:1838 818
(4 x 3.75 x 0.200 = 3 sqm) TBSC-Q.VIII-02

d) Formwork @ 3% of (a+b+c) 0.03

hour e&f) Overheads & Contractors Profit


Cost for 75 cum = a+b+c+d+e+f
Rate per cum = (a+b+c+d+e+f)/75
0 0%
Rate per 1 Cum

19 Vibrated cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggre
conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materia
site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental
operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500, 1700,
& 2702 (5th Revision) and as directed by the Engineer-in-Charge for C.C Pavement.

Unit = cum
Taking output = 15 cum
(A) Labour
0.86 nos Mate 540.00 day
1.50 nos Mason 540.00 day
20.00 nos Mazdoor 510.00 day
Total

(B) Material
8.10 cum Cost of 20mm SS-5 HBG M/C metal 1256.20 cum
5.40 cum Cost of 10mm SS-5 HBG M/C metal 989.95 cum
6.75 cum Sand 1303.00 cum
6.00 MT Cement at site 4600.00 MT
Total
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
Total
Total of A+B+C
(D) Form work
3.50 % Form work @ 3.50% on (A)+(B)+( C) 71279.40 Cum
Rate per 15 Cum
13.615% c&d) Overheads & Contractors Profit

Rate per 1 Cum

Road data- MoRTH-5th Revision 447524687.xlsx 292


Quantity Description of Item Rate per
20 Providing Dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate confor
to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggre
gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moi
content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mix
a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory r
finishing and curing complete for finished item of work as per MoRT&H (5th Revision) specification 1500,1700 & 601
Revision) and as directed by the Engineer-in-Charge for base coarse below CC Pavement.

Unit = cum
Taking output = 450 cum (990 Tonnes)
(A) Labour
1.12 nos Mate 540.00 day
6.00 nos Mazdoor Skilled 540.00 day
22.00 nos Mazdoor 510.00 day
Total
(B) Material
405.00 cum Crushed stone coarse aggregate of 25 mm and 12.5 mm 1175.58 cum
nominal sizes graded as per table 600-1 @ 0.90 cum/cum of
concrete conforming to clause 602.2.4.
(Average of 25 mm and 12 mm SS-5 HBG m/c metal)
203.00 cum Coarse Sand as per IS: 383 @ 0.45 cum/cum of concrete 1303.00 cum
67.50 MT Cement @ 150 kg/cum of concrete 4600.00 MT

(c) Machinery
6.00 hour Front end loader 1 cum bucket capacity 1843.52 hour
6.00 hour Cement concrete batch mix plant @ 75 cum per hour 1329.60 hour
6.00 hour Electric generator 100 KVA 1261.12 hour
6.00 hour Paver with electronic sensor 3426.65 hour
8.00 hour Vibratory roller 8-10 t capacity 2878.90 hour
8.00 hour Water tanker 6 KL capacity 698.88 hour
Total
Rate per 450 Cum
13.615% c&d) Overheads & Contractors Profit

Rate per 1 Cum

21 Construction of un-reinforced, dowel jointed, plain cement concrete pavement M30 grade over a prepared sub base
43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggre
not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid w
fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contrac
expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debon
strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing com
for finished item of work as per MoRT&H (5th Revision) specification 1500,1700 & 602 (5th Revision) and as dir
by the Engineer-in-Charge

Unit = Cum
Taking output = 75 cum (172.5 tonne)
(A) Labour
day Mate 540.00 day
5 Day Mason (1st Class) 564.00 day
5 Day Mason (2nd Class) 540.00 day
150 Day Mazdoor (Unskilled) 510.00 day
6 Day Mazdoor (Skilled) 540.00 day
2 Day Surveyor 0.00 day
6 Day Mazdoor (Semi-Skilled) 510.00 day
1 Day Blacksmith for cutting of dowel bars including 0.00 day
removal of burrs, fabrications & fixing of dowel bars.
Road data- MoRTH-5th Revision 447524687.xlsx 293
Quantity Description of Item Rate per

(B) Machinery
36 Hour Concrete mixer 397.50 Hour
9 Hour Needle vibrator Hour
9 Hour Screed vibrator Hour
9 Hour Plate vibrator/Plate Compacter 48.00 Hour
5 Hour water tanker 6 kl capacity 698.88 Hour
2 Hour Air Compressor (1 hour intial + 1 hour final) 588.40 Hour

(C ) Material
67.5 Cum Crushed stone coarse aggregates, grading will be as per Cum
clause 1501.2.4.1 (Table 1500.1 ) of specification @ 0.90
cum/cum of concrete (20 mm & 12 mm belnding)
44.55 Cum 20mm metal 1256.20 Cum
22.95 Cum 12.0mm metal 1144.95 Cum
33.75 Cum sand as per IS:383 and conforming to clause 1303.00 Cum
26.25 t 1500.2.4.2
Cement @ @ 4000.45 cum/cum
kg/cum of concrete
of concrete 4600.00 t
412.5 sqm Polythene sheet 125 micron 17.00 sqm
0 0 Mild Stell dowel bar 25 mm dia of grade S 240.500 mm long 0
20 nos.at culve/bridge slab and at construction joint including
0.118 t 5 per cent wastage
(4x20x0.500)+5percent wastage=42m@2.80kg per t
5 kg m=117.6kg
Bitumen primer @ 200 ml per joint for 23 joints 78.00 kg
19 lts Bitumen sealant 800 ml per joint for 23 joint 109.00 lts
90 mt Jute rope 12 mm diaincluding 5 per cen wastage 0.00 mt
90 mt Debonding strips 3.75 m ( lengh) x 10 mm (Width) x 5 mm 0.00 mt
483 No (thick)
Polythene cut-out of rubber
sheathig, filler board
covering 2/3rd or similar
dowel basmaterial
(20x23) and 0.00 No
including
tight fit 5 per
includingcent
5 wastage
per cent wastage
18 Kl Water for curing 98.00 Kl
3 sqm Joint filler board 12.7mm / 18 mm thick as per 729.00 sqm
IS:1838(4x3.75x0.200 = 3 sqm)

d) Formwork @ 3% of (a+b+c)
Sub Total
13.615% ADD 13.615% Contrator profit.

Rate per 1 Cum

RBR-CCPV-5 Cement Concrete Pavement


Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavem
thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2
(Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cu
capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel chan
laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per draw
spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in
continuous operation including provision of contraction and expansion, construction joints, applying debonding strip
primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curi
concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawi
and Technical Specification Clause 1501 MORD.

Unit = cum
Taking output = 75 cum (172.50 t)
(100 x 3.75 x 0.200)

Road data- MoRTH-5th Revision 447524687.xlsx 294


Quantity Description of Item Rate per
a)  Labour
day Mate 540.00 day
5.00 day Mason (1st class) 564.00 day
5.00 day Mason (2nd class) 540.00 day
150.00 day Mazdoor (Unskilled) 510.00 day
6.00 day Mazdoor (Skilled) 510.00 day
2.00 day Surveyor 900.00 day
6.00 day Mazdoor (Semi-Skilled) 540.00 day
1.00 day Blacksmith for cutting of dowel bars including removal of 564.00 day
burrs, fabrications & fixing of dowel bars.
b) Machinery
36.00 hour Concrete mixer 0.28 / 0.4 cum capacity (6 mixers) with weigh 472.6 hour
batcher and suitable capacity calibrated water tank
9.00 hourNeedle vibrator 216.70 hour
9.00 hourScreed vibrator 350 hour
9.00 hourPlate vibrator hour
4.00 hourConcrete joint cutting machine for initial & final cuts hour
5.00 hourWater tanker 6 kl capacity 698.88 hour
2.00 hourAir Compressor (1 hour initial + 1 hour final) 1614.40 hour
c) Material
67.50 cum Crushed stone coarse aggregates, grading will be as per 0.00 cum
Clause 1501.2.4.1 (Table 1500.1) of specifications @ 0.90
cum/cum of concrete (25 mm & 12.5 mm blending)
33.75 cum Sand as per IS:383 and conforming to Clause 1500.2.4.2 @ 1256.20 cum
0.45 cum/cum of concrete
30.00 t Cement @ 400 kg/cum of concrete 1144.95 t
412.50 sqm Polythene sheet 125 micron 17.00 sqm
Mild steel dowel bar 25 mm dia of grade S 240. 500 mm long
20 Nos. at culvert/bridge slab and at construction joint
including 5 per cent wastage.

0.118 t (4 x 20 x 0.500) + 5 per cent wastage = 42 m @ 2.80 kg per 1303.00 t


m = 117.6 kg.
5.00 kg Bitumen primer @ 200 ml per joint for 23 joints 0.00 kg
19.00 litre Bituminous sealant 800 ml per joint for 23 joints 78.00 litre
90.00 m Jute rope 12 mm dia including 5 per cent wastage m
90.00 m Debonding strips 3.75 m (length) x 10 mm (width) x 5 mm m
(thick) cut-out of rubber filler board or similar material
including 5 per cent wastage
483.00 No. Polythene sheathing, covering 2/3rd dowel bars (20x23) and No.
tight fit including 5 per cent wastage
122.00 litre Plasticizer 0.5 per cent by weight of cement litre

131.25 litre Curing compound (if used) @ 0.33 litre per sqm litre
18.00 kl Water for curing 98.00 kl
3.00 sqm Joint filler board 20 mm thick as per IS:1838 1022 sqm
(4 x 3.75 x 0.200 = 3 sqm)

d) Formwork @ 3% of (a+b+c) 3%

13.615% e&f) Overheads & Contractors Profit


Cost for 75 cum = a+b+c+d+e+f
Rate per cum = (a+b+c+d+e+f)/75

Road data- MoRTH-5th Revision 447524687.xlsx 295


Quantity Description of Item Rate per
22 Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing
technical specification including setting out, construction of shoring and bracing, removal of stumps and other delete
matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete for finished
of work, excluding seigniorage charges, as per MoRT&H specification 304 (5th Revision) and as directed b
Engineer-in-Charge
Unit : Cum
Taking out put = 240 Cum
(A) Labour
0.32 day Mate 540.00 day
8.00 day Mazdoor unskilled 0.00 day

(B) Machinery
6.00 hr Hydraulic Excavator 1 cum bucket capacity @ 60 cum per 2967.90 hr
hour
Rate per 240 Cum
13.615% c&d) Overheads & Contractors Profit

Rate per 1 Cum

23 Providing first class bedding with Granular material below the pipes of Hume pipe culverts suitably compac
rammed including cost and conveyance of materials to site etc., complete as per drawing and MoRT&H Specifica
2900 ( 5th Revision) and as directed by the Engineer-in-Charge.
Unit = cum
Taking output = 10 cum
(A) Labour
0.28 nos Mate 540.00 day
7.00 nos Mazdoor 0.00 day
Total

(B) Material
12.00 cum Cost of Granular material ( Gravel) 148.26 cum
Total
© Machinery
2.50 hr Plate compactor/Power rammer 53.76 hr
0.05 hr Water tanker 6 KL capacity 698.88 hr
Total
Rate per 10 Cum
13.615% c&d) Overheads & Contractors Profit

Rate per 1 Cum

24 Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone aggregate and fine aggre
conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, cente
machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P
complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed b
Engineer-in-Charge for foundation.

Unit = cum
Taking output = 15 cum
(A) Labour
0.64 nos Mate 540.00 day
1.00 nos Mason 510.00 day
15.00 nos Mazdoor 0.00 day
Total
(B) Material
13.50 cum Cost of 40mm SS-5 HBG M/C metal 799.95 cum
6.75 cum Sand 1256.20 cum
3.45 MT Cement at site 1144.95 MT
Total
© Machinery

Road data- MoRTH-5th Revision 447524687.xlsx 296


Quantity Description of Item Rate per
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
2.00 hr Water tanker 6 KL capacity 698.88 hr
Total
Rate per 15 Cum
13.615% c&d) Overheads & Contractors Profit

Rate per 1 Cum

25 Providing Vibrated Cement Concrete (1:3:6) using 40mm size HBG crushed stone aggregate and fine aggre
conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, cente
machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P
complete for finished item of work as per MoRT&H specification 1500,1700, 2200 (5th Revision) and as directed b
Engineer-in-Charge for Body walls.

Unit = cum
Taking output = 15 cum
(A) Labour
0.64 nos Mate 540.00 day
1.00 nos Mason 510.00 day
15.00 nos Mazdoor 0.00 day
Total
(B) Material
13.50 cum Cost of 40mm SS-5 HBG M/C metal 799.95 cum
6.75 cum Sand 1256.20 cum
3.45 MT Cement at site 1144.95 MT
Total
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
2.00 hr Water tanker 6 KL capacity 698.88 hr

Total of A+B+C
(D) Form work
10.00 % Form work @ 10% on (A)+(B)+( C) 33370.92 Cum
Rate per 15 Cum
13.615% c&d) Overheads & Contractors Profit

Rate per 1 Cum

26 Providing, laying Reinforced cement concrete Hume pipes of 1000mm / 800 mm / 600 mm Dia., NP-3 class for
culverts including cost and conveyance of Pipes etc., complete and Labour charges for laying, jointing of 1000 mm
mm / 600 mm dia. R.C.C Hume pipes in position including lifting, aligning, lowering and hoisting etc., as per drawing
as per MoRT&H Specification 2900, 2905 and 2906 (5th Revision) and IRC Special Publication No: 13 and as dire
by the Engineer-in-Charge for finished item of work.

Unit = metre
Taking output = 12.5 metre
600 mm Dia.,
(A) Labour
0.14 nos Mate 540.00 day
0.50 nos Mason 510.00 day
3.00 nos Mazdoor 0.00 day
Total
(B) Material
12.50 RM Cost of 600mm Dia., pipes ( As per Analysis sheet) 2530.23 RM
Total
Rate per 12.5 Rmt
13.615% c&d) Overheads & Contractors Profit

Road data- MoRTH-5th Revision 447524687.xlsx 297


Quantity Description of Item Rate per
Rate per 1 Rmt

800 mm Dia.,
(A) Labour
0.18 nos Mate 540.00 nos.
0.50 nos Mason 510.00 nos.
4.00 nos Mazdoor 0.00 nos.
Total
(B) Material
12.50 RM Cost of 800mm Dia., pipes 4108.89 RM
Total
Rate per 12.5 Rmt
13.615% c&d) Overheads & Contractors Profit

Rate per 1 Rmt

1000 mm Dia.
(A) Labour
0.18 nos Mate 540.00 day
0.50 nos Mason 510.00 day
4.00 nos Mazdoor 0.00 day
Total
(B) Material
12.50 RM Cost of 1000mm Dia., pipes 6415.58 RM
Total
Rate per 12.5 Rmt
13.615% c&d) Overheads & Contractors Profit

Rate per 1 Rmt

27 Providing, laying Reinforced cement concrete Hume pipes of 1000mm / 800 mm / 600 mm Dia., NP-4 class for
culverts including cost and conveyance of Pipes etc., complete and Labour charges for laying, jointing of 1000 mm
mm / 600 mm dia. R.C.C Hume pipes in position including lifting, aligning, lowering and hoisting etc., as per drawing
as per MoRT&H Specification 2900, 2905 and 2906 (5th Revision) and IRC Special Publication No: 13 and as dire
by the Engineer-in-Charge for finished item of work.

Unit = metre, Page 272,273 of MoRT&H SDB


Taking output = 12.5 metre
600 mm Dia.,
(A) Labour
0.14 nos Mate 540.00 day
0.50 nos Mason 510.00 day
3.00 nos Mazdoor 0.00 day
Total
(B) Material
12.50 RM Cost of 600mm Dia., pipes 2931.23 RM
Total
Rate per 12.5 Rmt
13.615% c&d) Overheads & Contractors Profit

Rate per 1 Rmt

800 mm Dia.,
(A) Labour
0.18 nos Mate 540.00 nos.
0.50 nos Mason 510.00 nos.
4.00 nos Mazdoor 0.00 nos.

Road data- MoRTH-5th Revision 447524687.xlsx 298


Quantity Description of Item Rate per
Total
(B) Material
12.50 RM Cost of 800mm Dia., pipes 5010.07 RM
Total
Rate per 12.5 Rmt
13.615% c&d) Overheads & Contractors Profit

Rate per 1 Rmt

1000 mm Dia.
(A) Labour
0.18 nos Mate 540.00 day
0.50 nos Mason 510.00 day
4.00 nos Mazdoor 0.00 day
Total
(B) Material
12.50 RM Cost of 1000mm Dia., pipes 8481.20 RM
Total
Rate per 12.5 Rmt
13.615% c&d) Overheads & Contractors Profit

Rate per 1 Rmt

28 Filling in between body walls with gravel including cost and conveyance of all materials to site etc., complete as
Clause 710.1.4 of IRC : 78 and as per MoRT&H Specification No. 2200 & 2907 (5th Revision) and as per Drawing
technical specifications for finished item of work.
Unit = cum, Page 462 of MoRT&H SDB
Taking output = 10 cum
(A) Labour
0.28 nos Mate 540.00 day
7.00 nos Mazdoor 0.00 day
Total
(B) Material
12.00 cum Cost of Gravel 148.26 cum
Total
© Machinery
2.50 hr Plate compactor/Power rammer/road roller 53.76 hr
0.05 hr Water tanker 6 KL capacity 698.88 hr
Total
Rate per 10 Cum
13.615% c&d) Overheads & Contractors Profit

Rate per 1 Cum

29 Providing SS Revetment 300 mm thick including cost and conveyance of materials to site and including labour cha
for packing the stones for revetment etc., complete for finished item of work as per MoRT&H specification 2504
revision ) and as directed by the Engineer-in-Charge for Pitching of slopes
(A) LabourPage 522 of MoRT&H SDB
0.04 nos Mate 540.00 day
0.35 nos Mason 510.00 day
0.75 nos Mazdoor for laying stones, filling quarry spalls 0.00 day
Total
(B) Material
1.00 cum Cost of SS Revetment 300 mm 258.70 cum
Road data- MoRTH-5th Revision 447524687.xlsx 299
Quantity Description of Item Rate per
0.20 cum Cost of stone spalls 127.26 cum
Total
Rate per 1 Cum
13.615% c&d) Overheads & Contractors Profit

Rate per 1 Cum

29 a. Rate for appron 550.18 per I cum

29 bRate for Rock toe


Page 522 of MoRT&H SDB
(A) Labour
0.04 nos Mate 540.00 day
0.35 nos Mason 510.00 day
0.75 nos Mazdoor for laying stones, filling quarry spalls 0.00 day
Total
2/3 of Labour charges
(B) Material
1.00 cum Cost of SS Revetment 300 mm 258.70 cum
0.20 cum Cost of stone spalls 127.26 cum
Total
Rate per 1 Cum
13.615% c&d) Overheads & Contractors Profit

Rate per 1 Cum

30 Providing and laying filter material with Gravel underneath pitching in slopes including cost and conveyan
materials to site including labour charges etc., complete for finished item of work as per MoRT&H Specification 250
Revision) and as directed by the Engineer-in-Charge
Unit = cum, Page 523 of MoRT&H SDB
Taking output = 1 Cum
(A) Labour
0.05 nos Mate 540.00 day
0.25 nos Mazdoor skilled 510.00 day
1.00 nos Mazdoor for laying stones, filling quarry spalls 0.00 day
Total
(B) Material
1.20 cum Cost of gravel 148.26 cum
Rate per 1 Cum
13.615% c&d) Overheads & Contractors Profit

Rate per 1 Cum

31 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggre
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost
conveyance of all materials to site and all labour charges for machine mixing,laying in position, Compacting , Vibr
and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoR
Specification 1500,1700, 2100 (5th Revision) for footings and Raft foundation .
Unit = cum, Page 335 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos Mate 540.00 day
1.50 nos Mason 510.00 day
20.00 nos Mazdoor 0.00 day
Total
(B) Material
8.10 cum Cost of 40mm SS-5 HBG M/C metal 799.95 cum
4.05 cum Cost of 20mm SS-5 HBG M/C metal 1256.20 cum
Road data- MoRTH-5th Revision 447524687.xlsx 300
Quantity Description of Item Rate per
1.35 cum Cost of 10mm SS-5 HBG M/C metal 989.95 cum
6.75 cum Sand 1303.00 cum
4.13 MT Cement at site 4600.00 MT
Total
(C) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr

Total of (A)+(B)+( C)
(D) Form work
4.00 % Form work @ 4% on (A)+(B)+( C) 49815.09 Cum
Rate per 15 Cum
13.615% c&d) Overheads & Contractors Profit

Rate per 1 Cum

32 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggre
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost
conveyance of all materials to site and all labour charges for machine mixing, laying in position,Compacting, Vibr
and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoR
Specification 1500,1700, 2200 (5th Revision) for Sub structure .
Unit = cum, Page 335,455 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos Mate 540.00 day
1.50 nos Mason 510.00 day
20.00 nos Mazdoor 0.00 day
Total
(B) Material
8.10 cum Cost of 40mm SS-5 HBG M/C metal 799.95 cum
4.05 cum Cost of 20mm SS-5 HBG M/C metal 1256.20 cum
1.35 cum Cost of 10mm SS-5 HBG M/C metal 989.95 cum
6.75 cum Sand 1303.00 cum
4.13 MT Cement at site 4600.00 MT
Total
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr

Total of (A)+(B)+( C)
(D) Form work
10.00 % Form work @ 10% on (A)+(B)+( C) 49815.09 Cum
Rate per 15 Cum
13.615% c&d) Overheads & Contractors Profit

Rate per 1 Cum

33 Vibrated reinforced cement concrete M 20 grade using 20mm & 10mm HBG crushed stone aggregate (Co
aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance
materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incid
hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding co
steel and its fabrication charges for finished item as per MoRT&H specification 1500,1600,1700 & 2100 (5th revis
and as directed by the Engineer-in-Charge for for foundations

Unit = cum, Page 472,457 of MoRT&H SDB


Taking output = 15 cum
(A) Labour
0.86 nos Mate 540.00 day
1.50 nos Mason 510.00 day

Road data- MoRTH-5th Revision 447524687.xlsx 301


Quantity Description of Item Rate per
20.00 nos Mazdoor 0.00 day
Total
(B) Material
8.10 cum Cost of 20mm SS-5 HBG M/C metal 1256.20 cum
5.40 cum Cost of 10mm SS-5 HBG M/C metal 989.95
6.75 cum Sand 1303.00 cum
5.12 MT Cement at site 4600.00 MT
Total
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
Total
Total of (A)+(B)+( C)
(D) Form work
4.00 % Form work @ 4% on (A)+(B)+( C) 56986.40 Cum
Rate per 15 Cum
13.615% c&d) Overheads & Contractors Profit

Rate per 1 Cum

Road data- MoRTH-5th Revision 447524687.xlsx 302


Quantity Description of Item Rate per
34 Plain cement concrete M 20 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate confor
to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site
labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and opera
charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel an
fabrication charges for finished item as per MoRT&H specification 1500,1600,1700 & 2200 (5th revision ) and
directed by the Engineer-in-Charge for Bed blocks & Backing walls (Sub-structure)

Unit = cum, Page 472,457 of MoRT&H SDB


Taking output = cum
(A) Labour
nos Mate 540.00 day
0.10 nos Mason 510.00 day
1.39 nos Mazdoor 0.00 day
Total
(B) Material
0.60 cum Cost of 20mm SS-5 HBG M/C metal 1256.20 cum
0.30 cum Cost of 10mm SS-5 HBG M/C metal 989.95
0.45 cum Sand 1303.00 cum
0.343 MT Cement at site 4600.00 MT
Total
© Machinery
0.40 hr Concrete mixer 0.4/0.28 cum 472.60 hr
0.40 hr Generator set 30 KVA 1007.20 hr
Total
Total of (A)+(B)+( C)
13.615% c&d) Overheads & Contractors Profit@13.615%

(D) Form work


4.00 % Form work @ 4% on (A)+(B)+( C) 3857.78 Cum
Rate per 1 Cum
13.615% c&d) Overheads & Contractors Profit

Rate per 1 Cum

35 Vibrated reinforced cement concrete M 20 grade using 20mm & 10mm HBG crushed stone aggregate (Co
aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance
materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incid
hire and operational charges of all T&P etc., complete as per approved drawings and as directed during executio
excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1600,1700 &
(5th revision ) and as directed by the Engineer-in-Charge for Deck slab

Unit = cum, Page 472 of MoRT&H SDB


Taking output = cum
(A) Labour
nos Mate 540.00 day
0.10 nos Mason 510.00 day
1.39 nos Mazdoor 0.00 day
Total
(B) Material
0.54 cum Cost of 20mm SS-5 HBG M/C metal 1256.20 cum
0.36 cum Cost of 10mm SS-5 HBG M/C metal 989.95
0.45 cum Sand 1303.00 cum
0.347 MT Cement at site 4600.00 MT
Total
© Machinery
0.40 hr Concrete mixer 0.4/0.28 cum 472.60 hr
0.40 hr Generator set 35 KVA 1007.20 hr

Road data- MoRTH-5th Revision 447524687.xlsx 303


Quantity Description of Item Rate per
Total
Total of (A)+(B)+( C)

(D) Form work


4.00 % Form work @ 20% on (A)+(B)+( C) 3860.20 Cum
Rate per 1 Cum
13.615% c&d) Overheads & Contractors Profit

Rate per 1 Cum

Road data- MoRTH-5th Revision 447524687.xlsx 304


Quantity Description of Item Rate per
36 Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate (Co
aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance
materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incid
and operational charges of all T&P etc., complete for finished item of work as per drawing BD/1-69( A) but exclu
cost of steel and its fabrication charges as per MoRT&H specification 1500, 1600,1700, & 2702 (5th Revision)
as directed by the Engineer-in-Charge for wearing coat over Deck slab.

Unit = cum, Page 477,492 of MoRT&H SDB


Taking output = 15 cum
(A) Labour
0.90 nos Mate 540.00 day
1.50 nos Mason 510.00 day
21.00 nos Mazdoor 0.00 day
Total

(B) Material
8.10 cum Cost of 20mm SS-5 HBG M/C metal 1256.20 cum
5.40 cum Cost of 10mm SS-5 HBG M/C metal 989.95 cum
6.75 cum Sand 1303.00 cum
6.10 MT Cement at site 4600.00 MT
Total
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 1007.20 hr

2.25 nos Labour for cleaning deck slab concrete 0.00 day
Rate per 15 Cum
13.615% c&d) Overheads & Contractors Profit

Rate per 1 Cum

37 Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBG crushed stone aggregate (Co
aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance
materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incid
and operational charges of all T&P etc., complete for finished item of work as per Approved drawing but excluding
of steel and its fabrication charges as per MoRT&H specification 1500, 1600,1700, & 2704 (5th Revision) an
directed by the Engineer-in-Charge for Approach slab.

Unit = cum, Page 340,501 of MoRT&H SDB


Taking output = 15 cum
(A) Labour
0.86 nos Mate 540.00 day
1.50 nos Mason 510.00 day
20.00 nos Mazdoor 0.00 day
Total

(B) Material
8.10 cum Cost of 20mm SS-5 HBG M/C metal 1256.20 cum
5.40 cum Cost of 10mm SS-5 HBG M/C metal 989.95 cum
6.75 cum Sand 1303.00 cum
6.05 MT Cement at site 4600.00 MT
Total
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 1007.20 hr
Total
Total of (A)+(B)+( C)
(D) Form work
2.00 % Form work @ 2% on (A)+(B)+( C) 62254.40 Cum

Road data- MoRTH-5th Revision 447524687.xlsx 305


Quantity Description of Item Rate per
Rate per 15 Cum
13.615% c&d) Overheads & Contractors Profit

Rate per 1 Cum

38 Construction of precast VRCC railing of M20 grade using HBG crushed stone aggregate of size not exceeding 12
and fine aggregate conforming to table 1000-2 true to line and grade, tolerance of vertical RCC post not to exceed
500, centre to centre spacing between vertical posts not to exceed 2000mm, leaving adequate space between ve
posts for expansion including cost, conveyance of all materials to site and labour charges, centering, machine m
laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved draw
and as directed during execution but excluding cost of steel and its fabrication charges as per approved drawings
technical specifications for finished item of work as per MoRT&H Specification 2703, 1500, 1600, 1700 (5th Revision

Unit = 1 RM, Page 472,497 of MoRT&H SDB


Hand rails without foot paths
Material
M20 grade VRCC
No. of vertical end posts = 2 x 0.30x 0.20 x0.77 = 0.0924 cum
Internal vertical posts = 3x0.18x0.20x0.77 = 0.0832 cum
hand rail in2 tier =6.74-(2x0.3+3x0.18)=5.60 RM
quantity of RCC = 2x5.60x0.115x0.165 = 0.2125 cum
Total Concrete = 0.3881 cum
VRCC M 20 Grade
(A) Labour
0.86 nos Mate 540.00 day
1.50 nos Mason 510.00 day
20.00 nos Mazdoor 0.00 day
Total
(B) Material
8.10 cum Cost of 12mm SS-5 HBG M/C metal 1144.95 cum
5.40 cum Cost of 10mm SS-5 HBG M/C metal 989.95 cum
6.75 cum Sand 1303.00 cum
5.12 MT Cement at site 4600.00 MT
Total
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 1007.20 hr
Total
Total of (A)+(B)+( C)
(D) Form work
12.00 % Form work @ 12% on (A)+(B)+( C) 57075.28 Cum
Rate per 1 Cum
13.615% c&d) Overheads & Contractors Profit

Rate per 15 Cum


Cost of Railing for one side
0.3881 Cum Cost per - 6.74 Rmt. 4841.84 cum
Cost per 1 RM =
Rate to be adopted

Hand rails without foot paths (Output =12.719 RM)


Material
M20 grade VRCC
No. of vertical end posts = 2 x 0.30x 0.20 x0.77 = 0.092
Internal vertical posts = 6x0.18x0.20x0.77 = 0.166
hand rail in2 tier =12.719-(2x0.3+6x0.18)=11.04 RM
quantity of RCC = 2x11.04x0.115x0.165 = 0.419
Total Concrete = 0.678

Road data- MoRTH-5th Revision 447524687.xlsx 306


Quantity Description of Item Rate per
Cost of Railing for one side
0.6776 Cum Cost per - 12.719 Rmt. 4841.84 cum
Cost per 1 RM =
Rate to be adopted

39 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggre
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost
conveyance of all materials to site and all labour charges for machine mixing,laying in position, Compacting , Vibr
and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoR
Specification 1500,1700, 2100,2700 (5th Revision) for levelling course
Unit = cum, Page 335,500 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos Mate 540.00 day
1.50 nos Mason 510.00 day
20.00 nos Mazdoor 0.00 day
Total
(B) Material
8.10 cum Cost of 40mm SS-5 HBG M/C metal 799.95 cum
4.05 cum Cost of 20mm SS-5 HBG M/C metal 1256.20 cum
1.35 cum Cost of 10mm SS-5 HBG M/C metal 989.95 cum
6.75 cum Sand 1303.00 cum
4.13 MT Cement at site 4600.00 MT
Total
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 33 KVA 842.20 hr
Total
Rate per 15 Cum
13.615% c&d) Overheads & Contractors Profit

Rate per 1 Cum

40 Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm size grouted with 0.20 cum o
(1:4:8) including cost and conveyance of materials to site and including labour charges for packing the stone
revetment etc., complete for finished item of work as per MoRT&H specification 2504 ( 5th revision ) and as directe
the Engineer-in-Charge for quadrential revetment.
Cost of CC(1:4:8), Page 331,522 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.64 nos Mate 540.00 day
1.00 nos Mason 510.00 day
15.00 nos Mazdoor 0.00 day
Total
(B) Material
13.50 cum Cost of 40mm SS-5 HBG M/C metal 799.95 cum
6.75 cum Sand 1303.00 cum
2.43 MT Cement at site 4600.00 MT
Total
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 33 KVA 842.20 hr
2.00 hr Water tanker 6 KL capacity 698.88 hr
Total
Cost per 15 cum
Rate for 1 cum
Cost of Grouted Revetment
Unit = Cum

Road data- MoRTH-5th Revision 447524687.xlsx 307


Quantity Description of Item Rate per
Taking output = 1 cum
(A) Labour
0.04 nos Mate 540.00 day
0.35 nos Mason 510.00 day
0.75 nos Mazdoor for laying stones, filling quarry spalls 0.00 day
Total
(B) Material
0.20 cum Cost of CC(1:4:8) 2727.65 cum
1.00 cum Cost of Rough stone HBG 300mm thick 350.60 cum
Total
Rate per 1 Cum
13.615% c&d) Overheads & Contractors Profit

Rate per 1 Cum

41 Back filling behind Abutments with gravel including cost ,conveyance of all materials to site etc., complete as
Clause 710.1.4 of IRC : 78 and as per MoRT&H Specification No. 2200 (5th Revision) and as per Drawing and tech
specifications for finished item of work
Unit = cum, Page 335,500 of MoRT&H SDB
Taking output = 10 cum
(A) Labour
0.28 nos Mate 540.00 day
7.00 nos Mazdoor 0.00 day
Total

(B) Material
12.00 cum Cost of Granular material 148.26 cum
Total
© Machinery
2.50 hr Plate compactor/Power rammer/road roller 1303.00 hr
0.05 hr Water tanker 6 KL capacity 698.88 hr
Total
Rate per 10 Cum
13.615% c&d) Overheads & Contractors Profit
Rate per 10 Cum
Rate per 1 Cum

42 Providing and laying of filter media using 50% of 150 mm IRC soling stone and 50 % of 40 mm HBG m
satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to athickness of not less than 60
with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind
abutment, wing wall and return wall to the full height compacted to a firm condition including cost and conveyance an
labour charges as directed by the departmental officers as per drawing and Technical specifications as per c
710.1.1 of IRC:78 and Clause 2200 of MoRT&H (5th Revision) for finished item of work.
Unit = cum, Page 463 of MoRT&H SDB
Taking output = 10 cum
(A) Labour
0.32 nos Mate 540.00 day
7.00 nos Mazdoor for filling watering, ramming etc 0.00 day
1.00 nos Mazdoor skilled 540.00 day
Total

(B) Material
Filter media of stone aggregate conforming
to clause 2504.2.2 of MoRT&H
6.00 cum Cost of 150mm size IRC soling stone (HBG) 258.70 cum
6.00 cum Cost of 40mm size IRC HBG metal 799.95 cum
Total
(C) Machinery

Road data- MoRTH-5th Revision 447524687.xlsx 308


Quantity Description of Item Rate per
0.06 hr Water tanker 6 KL capacity 698.88 hr
Total
Total of (A)+(B)+( C)
13.615% c&d) Overheads & Contractors Profit
Rate per 10 Cum
Rate per 1 Cum

43 Providing HYSD bars ( Fe-415 ) of different diameters, wrought and put up bars of all diameters including cost
conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding
tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling cha
and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for fini
item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specific
1600 & 2300 (5th revision) and as per I.S.1786 of 1985 for Super structure of R.C.C items.

Unit = MT, Page 489,490 of MoRT&H SDB


Taking output = 1 MT
(A) Labour
0.44 nos Mate 540.00 day
3.00 nos Black smith 564.00 day
8.00 nos Mazdoor 0.00 day
Total
(B) Material
1.05 MT HYSD bars including overlaps 46000.00 MT
8.00 Kg Binding wire 50.00 Kg
Total
Total of (A)+(B)
13.615% c & d) Overheads & Contractors Profit
Rate per 1 MT
Rate per 1 Kg

44 Providing HYSD bars ( Fe-415 ) of different diameters, wrought and put up bars of all diameters including cost
conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding
tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling cha
and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for fini
item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specific
1600 & 2200 (5th revision) and as per I.S.1786 of 1985 for Sub structure of R.C.C items.

Unit = MT, Page 459,460 of MoRT&H SDB


Taking output = 1 MT
(A) Labour
0.34 nos Mate 540.00 day
2.00 nos Black smith 564.00 day
6.50 nos Mazdoor 0.00 day
Total
(B) Material
1.05 MT HYSD bars including overlaps 46000.00 MT
6.00 Kg Binding wire 50.00 Kg
Total
Total of (A)+(B)
13.615% c & d) Overheads & Contractors Profit
Rate per 1 MT
Rate per 1 Kg

Road data- MoRTH-5th Revision 447524687.xlsx 309


Quantity Description of Item Rate per
45 Providing HYSD bars ( Fe-415 ) of different diameters, wrought and put up bars of all diameters including cost
conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding
tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling cha
and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for fini
item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specific
1600 & 2100 (5th revision) and as per I.S.1786 of 1985 for foundations of R.C.C items.

Unit = MT, Page 448 of MoRT&H SDB


Taking output = 1 MT
(A) Labour
0.40 nos Mate 540.00 day
2.00 nos Black smith 564.00 day
6.00 nos Mazdoor 0.00 day
Total
(B) Material
1.05 MT HYSD bars including overlaps 46000.00 MT
6.00 Kg Binding wire 50.00 Kg
Total
Total of (A)+(B)
13.615% c & d) Overheads & Contractors Profit
Rate per 1 MT
Rate per 1 Kg

46 Providing Uncoated Mild Steel bars ( Fe-250 ) of different diameters, wrought and put up bars of all diameters inclu
cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, ben
binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire an
handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R
items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and a
MoRT&H specification 1600 & 2200 (5th revision) and as per I.S.1786 of 1985 .

Unit = MT, Page 460 of MoRT&H SDB


Taking output = 1 MT
(A) Labour
0.28 nos Mate 540.00 day
1.50 nos Black smith 564.00 day
5.50 nos Mazdoor 0.00 day
Total
(B) Material
1.05 MT Mild steel bars including overlaps 46000.00 MT
6.00 Kg Binding wire 50.00 Kg
Total
Total of (A)+(B)
13.615% c & d) Overheads & Contractors Profit
Rate per 1 MT
Rate per 1 Kg

47 Sand filling in foundation including cost and conveyence of all materials to site and watering, tamping etc., comple
finshed item of work as per MoRT&H specification 304 (5th Revision) and as directed by the Engineer - in - Charge.
Unit = cum Page 422 of MoRT&H SDB
g output = 1 cum
(A) Labour
0.01 day Mate 540.00 day
0.30 day Mazdoor 0.00 day

(B) Material
1.20 Cum Sand for filling 1303.00 cum
Total of (A)+(B)
13.615% c & d) Overheads & Contractors Profit
Rate per 1 Cum

Road data- MoRTH-5th Revision 447524687.xlsx 310


Quantity Description of Item Rate per
48 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggre
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost
conveyance of all materials to site and all labour charges , centering, machine mixing, laying in position,Compa
Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete a
MoRT&H Specification 1500,1700, 2200 (5th Revision) for Dividers .
Unit = Page 335,455 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos Mate 540.00 day
1.50 nos Mason 510.00 day
20.00 nos Mazdoor 0.00 day
Total
(B) Material
8.10 cum Cost of 40mm SS-5 HBG M/C metal 799.95 cum
4.05 cum Cost of 20mm SS-5 HBG M/C metal 1256.20 cum
1.35 cum Cost of 10mm SS-5 HBG M/C metal 989.95 cum
6.75 cum Sand 1303.00 cum
4.13 MT Cement at site 4600.00 MT
Total
(C) Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr

Total of A+B+C
(D) Form work
4.00 % Form work @4% on (A)+(B)+( C) 49815.09
Total of A+B+C+D
13.615% c & d) Overheads & Contractors Profit
Rate for 15 Cum
Rate per 1 Cum

49 Vibrated reinforced cement concrete M 20 grade using 20mm & 10mm HBG crushed stone aggregate (Co
aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance
materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incid
hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding co
steel and its fabrication charges for finished item as per MoRT&H specification 1500,1600,1700 & 2200 (5th revis
and as directed by the Engineer-in-Charge for Cover slabs over side drains

Unit = Page 472,457 of MoRT&H SDB


Taking output = 15 cum
(A) Labour
0.86 nos Mate 540.00 day
1.50 nos Mason 510.00 day
20.00 nos Mazdoor 0.00 day
Total
(B) Material
8.10 cum Cost of 20mm SS-5 HBG M/C metal 1256.20 cum
5.40 cum Cost of 10mm SS-5 HBG M/C metal 989.95 cum
6.75 cum Sand 1303.00 cum
5.12 MT Cement at site 4600.00 MT
Total
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr
6.00 hr Generator set 35 KVA 842.20 hr
Total
Total of A+B+C
(D) Form work
4.00 % Form work @ 4% on (A)+(B)+( C) 56986.40

Road data- MoRTH-5th Revision 447524687.xlsx 311


Quantity Description of Item Rate per
Total of A+B+C+D
13.615% c & d) Overheads & Contractors Profit
Rate for 15 Cum
Rate per 1 Cum

50 Plastering in CM (1:5) 12 mm thick including cost and conveyance of all materials , labour charges , curing etc
complete for finished item of work as directed by the Engineer -in-Charge
Unit = 10 sqm Page 452 & 333 of MoRT&H SDB
output = 10 sqm

(A) Labour
0.04 day Mate 540.00 day
0.50 day Mason 510.00 day
0.50 day Mazdoor 0.00 day

(B) Material
0.144 Cum Cement Mortar (1:5) 2783.55 Cum
Total of A+B
13.615% c & d) Overheads & Contractors Profit
Rate for 10 Sqm
Rate per 1 Sqm

Sub-Analysis
Cement Mortar (1:5)
(a) Material
0.303 MT Cement 4600.00 1393.80
1.05 cum Sand for Mortar 1303.00 1368.15

(b) Labour
0.04 day Mate 540.00 21.60
0.90 day Mazdoor 0.00 0.00
Rate per cum 2783.55

51 Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfa

Unit = 1 sqm Page 220 of MoRT&H SDB


Taking output = 40 sqm

(A) Labour
0.12 day Mate 540.00 day
2.00 day Painter 648.00 day
1.00 day Mazdoor 0.00 day

(B) Material
6.00 Litres Paint Confirming to requirement of clause 803.3 190.00 Lit
Total of A+B
13.615% c & d) Overheads & Contractors Profit
Rate for 10 Sqm
Rate per 1 Sqm

52 Providing 25.4 mm thick Mastic pads for Expansion joints etc., complete for finished item of work.

Rate as per Buildings AP SSR 2017-18 (BMS - W .20)

53 Providing 12.7 mm thick Mastic pads for Expansion joints etc., complete for finished item of work.

Road data- MoRTH-5th Revision 447524687.xlsx 312


Quantity Description of Item Rate per
Rate as per Buildings SSR 2017-18 (BMS - W.21)

54 Forming earthen shoulders with selective soils obtained from side earth having MDD of not less than 1.75 gms/c
mechnical means with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavati
soils at borrowed area, conveyance of soil, depositing the soils on the embankment, spreading soils, breaking c
sectioning and consolidation with vibratory road roller @ OMC to meet requirement of table 300-2 of MORT&H inclu
all hire and operational charges of T&P , complete for finished item of work as per MORT&H specification 305
revision) (Payment will be made based on levels for finished item of work)
Unit = cum
Taking output = 100 cum
(A) Labour
0.02 nos Mate 510.00 day
0.50 nos Mason unskilled 0.00 day
Total

(B) Material
1.67 hr Hydraulic Excavator 1 cum bucket capacity @ 60 cum per 2967.90 hr
hour
0.00 t.km Tipper 6.00 cum
Add 10% extra towards cost of carriage to cover cost of
0.50 hr loading
Dozer 80and
HPunloading
for spreading @ 200 cum per hour 2661.20 hr
4.00 hr Water tanker 6 KL 698.88 hr
1.00 hr Vibratory roller 8T 2878.90 hr
Total
6.00 hr Generator set 35 KVA 0.00 hr
Total of A+B
13.615% c & d) Overheads & Contractors Profit
Rate for 100 Cum
Rate per 1 Cum

55 Forming shoulders with borrowed useful seclected earth having MDD of not less than 1.75 gms/cc from outside
boundary by mechnical means with all leads and lifts including pre-watering of soil at borrow area, removal of top
excavation of soils at borrowed area, conveyance of soil, depositing the soils on the embankment, spreading
breaking clods, sectioning and consolidation with vibratory road roller @ OMC to meet requirement of table 300
MORT&H including all hire and operational charges of T&P , complete for finished item of work as per MOR
specification 305 (5th revision) (Payment will be made based on levels for finished item of work)

Unit = cum
Taking output = 100 cum
(A) Labour
0.04 nos Mate 510.00 day
1.00 nos Mason unskilled 0.00 day
Total
(B) Material
1.67 hr Hydraulic Excavator 1 cum bucket capacity @ 60 cum per 2967.90 hr
hour
1600.00 t.km Tipper ( 160 x 10Hrs ) 6.00 cum
Add 10% extra towards cost of carriage to cover cost of
loading and unloading

0.50 hr Dozer 80 HP for spreading @ 200 cum per hour 2661.20 hr


4.00 hr Water tanker 6 KL 698.88 hr
1.00 hr Vibratory roller 8T 2878.90 hr
Total
6.00 hr Generator set 35 KVA 0.00 hr
Total of A+B
13.615% c & d) Overheads & Contractors Profit

Road data- MoRTH-5th Revision 447524687.xlsx 313


Quantity Description of Item Rate per
Rate for 100 Cum
Rate per 1 Cum

56 Dismantling of existing structures like culverts , bridges, retaining walls and other structures comprising of mas
cement, concrete, wood work , steel work, including T&P and scaffolding wherever necessary sorting the disma
material, disposal of unserviceable materials and stacking the materials with all lifts and lead of 1000 m ( By Mecha
means in Cement concrete grade M-15 & M-20) as per MoRTH specification 202 , 2.4 II (A) (5th revision)

Page 23,24,25 of MoRT&H SDB


Unit = cum
Taking output = 1.25 cum
(A) Labour
0.02 nos Mate 540.00 day
0.25 nos Mazdoor for pneumatic breaker 648.00 day
0.25 nos Mazdoor for loading and unloding 0.00 day
Total
(B) Machinery
0.67 hour Air Compressor 250 cfm with 2 leads of Pneumatic breaker 1358.70 hr
@ 1.5 cum per hour
0.27 hour Tractor Trally 345.00 hr
Total
Total of A+B
13.615% c & d) Overheads & Contractors Profit
Rate for 1.25 Cum
Rate per 1 Cum

57 Dismantling of existing structures like Stone Masonry in Cement Mortar by mechanical means including T&P
scaffolding wherever necessary sorting the dismantled material, disposal of unserviceable materials and stackin
materials with all lifts and lead of 1000 m as per MoRTH specification 202 , 2.4 III (B) (5th revision)
Page 23,24,25 of MoRT&H SDB
Unit = cum
Taking output = 1.25 cum
(A) Labour
0.03 nos Mate 540.00 day
0.75 nos Mazdoor for loading and unloding 0.00 day
Total
(B) Machinery
0.27 hour Tractor Trally 345.00 hr
Total
Total of A+B
13.615% c & d) Overheads & Contractors Profit
Rate for 1.25 Cum
Rate per 1 Cum

58 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and trees
upto 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of service
material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not excee
150 mm thickness by mechanical means in area of light jungle.
Unit = 1 sqm Page 22 & 23 of MoRT&H SDB
tput = 1 Hectare
(A) Labour
0.16 day Mate 540.00 day
4.00 day Mazdoor 0.00 day
Total
(B) Machinery
10.00 hr Dozer 80 HP with attachment for removal of trees & stumps. 2661.20 hr

Road data- MoRTH-5th Revision 447524687.xlsx 314


Quantity Description of Item Rate per
1.00 hr Tractor-Trolley 345.00 cum
Total
Total of A+B
13.615% c & d) Overheads & Contractors Profit
Rate for 10000 Sqm
Rate per 1 Sqm

59 Picking the existing BT surface 40 mm deep removal of picked up chips to road side spreading old useful metal to
surface , hand packing sectioning to propoer camber etc., including cost and conveyance of stone dust blindage @
cum /10 Sqm and spreading including watering rolling with 8 to 10 t capacity power roller complete for finished ite
work as directed by the Engineer-in-Charge
1.000 Sqm Picking rate as per SSR 2016-17 70.00 10 sqm
0.025 Cum Cost of Stone Dust for blindage 663.83 Cum
0.025 Cum Spreading charges of stone dust 230.00 10 Cum
1.000 Sqm Hire chages of Power Roller 6.65 Sqm

Rate per 1 Sqm

60 Dismantling of flexible pavements by mechanical means and disposal of dismantled materials up to a lead of
metres, stacking serviceable and unserviceable materials separately as directed by the Engineer-in-Charge and a
MoRTH specification 202 II (5th revision)
Page 23,24,25 of MoRT&H SDB
Unit = cum
Taking output = 1.00 cum
(A) Labour
0.01 nos Mate 540.00 day
0.30 nos Mazdoor 0.00 day
Total
(B) Machinery
0.38 hour Tractor Trally 345.00 hr
0.017 hour Farm tractor with ripper @ 60 cum per hour 588.40 hr
Total
Total of A+B
13.615% c & d) Overheads & Contractors Profit
Rate for 1.00 Cum
Rate per 1 Cum

61 Providing weep holes in VCC Abutments, Return walls and wing walls with 100mm Diameter AC pipe extending thr
the full width of the structure at 1.00m C/C in both horizontal and vertical direction so that the weep holes in
horizontal direction is staggered from the weep holes laying above and below lines as shown in drawing including
and conveyance of the A.C pipes and labour charges for cutting to required length, placing the pipe with a slope of a
1V : 20H towards stream side face etc., complete for finished item of work for weep holes as per MoRT&H specific
2706 & 2200 (5th Revision)

Unit = Page 461,333 of MoRT&H SDB


Taking output = 30 RM
Cement Mortor (1:3) (Out put = 1Cum)
Material
0.51 MT Cost of Cement 4600.00 MT
1.05 cum Cost of Sand 1303.00 cum

Labour
0.04 nos Mate 540.00 day
0.90 nos Mazdoor 0.00 day

Road data- MoRTH-5th Revision 447524687.xlsx 315


Quantity Description of Item Rate per
Cost per 1 Cum
(A) Material
31.50 RM Cost of 100 mm Dia., AC pipe 292.00 RM
10.00 nos collors for AC pipe 29.20 each
30.00 nos MS clamps 13.00 each
0.05 cum Cement mortor (1:3) 3735.75 cum

(B) Labour
0.03 nos Mate 540.00 day
0.50 nos Mason 648.00 day
0.25 nos Mazdoor 0.00 day
Total
Rate per 30 Rmt
13.615% c&d) Overheads & Contractors Profit

Rate per 1 Rmt

62 Supplying and laying of seperation membrane 125 micron and as per ISI standard specification duly fixing over CC(1
including cost, conveyance of all materials etc., complete and as directed by the Engineer-in-Charge during executi
work.
Rate as per SoR 2017-18
Rate per 1 Sqm

63 Excavation in hilly areas in hard rock requiring blasting by mechanical means for road cutting ., complete inclu
trimming of slopes for finished item of work as per MoRT&H specification 301(5th Revision) and as directed b
Engineer-in-Charge duly disposing of excavated earth on valley side.

Unit : Cum Page 86 of MoRT&H SDB


Taking out put = 170 Cum
(A) Labour
0.49 day Mate 540.00 day
10.00 day Mazdoor 0.00 day
2.00 day Driller 648.00 day
0.25 day Blaster 678.00 day

(B) Machinery
6.00 hr Dozer 80 HP (D -80 A 12) @ 28.32 cum/hr 2661.20 hr
5.00 hr Air complressor 250 cfm with 2 jack hammer @ 20 cum/hr 588.40 cum

(C) Material
35.00 kg Gelatine 80 per cent ( Explosive small dia) Sno.26-Irrigation 75.00 Kg
140.00 Nos Electric detonators @ 1 Detonator for 2 Gelatine sticks of 8.00 No
125 gms each
Total of A+B + C
13.615% c & d) Overheads & Contractors Profit
Rate for 170 Cum
Rate per 1 Cum

64 Supplying and fixing of CI Drainage spouts complete as per MoRT&H specification No. 2705 (5th Revision) and a
drawing Sd/205
Unit = 1 No.
(A) Labour
For fabrication
0.02 nos Mate 540.00 day
0.02 nos Skilled (Blaksmith, Welder etc.) 600.00 day
0.02 nos Mazdoor 0.00 day

Road data- MoRTH-5th Revision 447524687.xlsx 316


Quantity Description of Item Rate per
For fixing in position
0.01 nos Mate 540.00 day
0.01 nos Mason 540.00 day
0.20 nos Mazdoor 0.00 day

Total labour cost


(B) Material
4.00 Kg Corrosion resistant structural steel including 5% wastage 44.50 Kg
2.00 nos GI Pipe 100 mm dia 268.00 each
6.00 nos GI Cowl 10 mm dia 23.00 each
2.00 nos Galvonized MS Flat Clamo 195.00 each

5.00 % Add 5% for cost of material & labour for Electrodes, cutting 1275.60
gas, Anti corrossive bituminous paint, Mild steel grating etc.,

Total of A+B + C
13.615% c & d) Overheads & Contractors Profit
Rate for 1No

65 Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less
40 kg each complete as per drawing and MoRTH specification 2503.2 (5th revision)
Unit = 1 Cum
(A) Labour
0.04 nos Mate 540.00 day
0.35 nos Mason 540.00 day
0.75 nos Mazdoor 0.00 day

(B) Material
1.00 cum Cost of Jeddy Stone 450 mm to 600 mm thick 392.45 cum
0.20 cum Cost of Stone spalls 127.26 cum

Total of A+B
13.615% c & d) Overheads & Contractors Profit
Rate for 170 Cum
Rate per 1 Cum

72 Providing B.T. patch work for pot holes using 40 to 45mm HBG metal with required quantity of 10 to 12mm size
key chips and 42 Kgs of 80/100 grade bitumen per one cum of work for filling the pot holes including removal of l
material in the pot holes trimming the edges to provide form vertical faces cleaning applying tack coat filling the pot h
compacting and finishing including cost and conveyance of materials, T&P charges and all labour charges fo
operations etc., complete for finished item of work as directed by the Engineer-in-charge in the following reaches.

Unit : Cum
Taking out put = 1 Cum
(A) Labour
2.86 day Mazdoor unskilled 0.00 day

(B) Machinery
0.27 hr Power road roller 8 T for initial breakdown rolling 1342.30 hr

(C) Material
1.20 cum 40 mm IRC HBG m/c Chips 799.95 cum
0.13 cum 9.5 to 11.2 mm IRC HBG m/c Chips 962.83 cum
0.042 MT 80/100 grade Bitumen 32828.85 MT

Total of A+B + C

Road data- MoRTH-5th Revision 447524687.xlsx 317


Quantity Description of Item Rate per
13.615% c & d) Overheads & Contractors Profit
Rate for 170 Cum
Rate per 1 Cum

73 Providing B.T. patch work for pot holes using 20 mm HBG machine crushed metal with required quantity of
12mm size HBG key chips and 80/100 grade bitumen at 72 Kgs / 1 cum of work for filling the pot holes inclu
removal of loose material in the pot holes, trimming the edges to provide form vertical faces, cleaning, applying tack
filling the pot holes compacting with power Road roller of 8 to 10 T and finishing including cost and conveyan
materials T&P charges and all labour charges for all operations etc., complete for finished item of work as directed b
Engineer-in-charge in the following reaches.

Unit : Cum
Taking out put = 1 Cum
(A) Labour
2.86 day Mazdoor unskilled 0.00 day

(B) Machinery
0.27 hr Power road roller 8 T for initial breakdown rolling 1342.30 hr

(C) Material
1.20 cum 20 mm IRC HBG m/c Chips 1256.20 cum
0.13 cum 9.5 to 11.2 mm IRC HBG m/c Chips 962.83 cum
0.072 MT 80/100 grade Bitumen 32828.85 MT

Total of A+B + C
13.615% c & d) Overheads & Contractors Profit
Rate for 170 Cum
Rate per 1 Cum

74 Imporatation of good quality red earth congenial for plants grouth of light textured, crystalline, porous and fri
generally acidic or neutral but not alkaline, fertile, cost, transportation, loading, unloading etc complete
1.00 cum Good red earth 115.26 cum
13.615% c & d) Overheads & Contractors Profit
Rate per 1 Cum

75 Spreading of sludge farm yard manure or/ and good earth in required thickness (cost of sludge, farm yard manure o
good earth to be paid for separately) Specification 307 MORTH
Unit = cum
Taking output = 15 cum
a) Labour
0 No Mate 540.00 day
1.040 No Mazdoor (Unskilled) 0.00 day

13.62% b&c) Overheads & Contractors Profit


Cost for 15 cum= a+b+c
Rate per 1 Cum

76 Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Constructi
granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, m
by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired de
complete as per Clause 401.4 as per Technical Specification Clause 408 MORD.

Using naturally occurring gravel & stone dust


Unit = cum
Taking output = 300 cum 300 Cum
a)  Labour
0.00 Nos Mate 540.00 day
2.48 Nos Mazdoor (Skilled) 540.00 day

Road data- MoRTH-5th Revision 447524687.xlsx 318


Quantity Description of Item Rate per
10.00 Nos Mazdoor (Unskilled) 0.00 day
Total - (A)
b) Machinery
6.00 hour Motor grader 110 HP 50 cum per hour 3601.92 hour
30.00 hour Three wheel 80-100 kN static roller @10 cum per hour 1342.30 hour
12.00 hour Tractor with rotavator 25 cum per hour 345.00 hour
5.00 hour Water tanker 6 kl capacity 698.88 hour
Total - (B)
c) Material
384.00 cum Naturally occurring Material (Local materials as per Table
400.13)
153.60 cum Gravel @ 40% 148.26 cum
230.40 cum Stone Dust @ 60% 614.95 cum
30.00 kl Water 98.00 kl
Total - (C)
Sub- Total of A+B+C
13.62% b&c) Overheads & Contractors Profit
Cost for 300 cum
Rate per 1 Cum

77 RBR-TSRA-12 : Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Bead
Bituminous Surface : Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflecto
glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IR
.The finished surface to be level, uniform and free from streaks and holes as per Specification 803 MORTH

Unit = sqm
Taking output = 600 sqm
a) Labour
0.00 Nos Mate 540.00 day
0.78 Nos Mazdoor 510.00 day

b) Machinery
10.00 hour Road marking machine @ 60 sqm per hour 124.32 hour
0.50 hour Tractor-trolley 464.80 hour

c) Material
1500.00 Litre Hot applied thermoplastic compound 211 Litre
150.00 kg Reflectorising glass beads 229 kg

Sub- Total of A+B+C


13.615% d&e) Overheads & Contractors Profit
Cost for 600 sqm = a+b+c+d+e
Rate per sqm = a+b+c+d+e)/600
78 RBR-TSRA-28 : Road Markers/Road Stud with Lens Reflector : Providing and fixing of road stud 100 x 100 mm
cast in aluminum, resistant to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asp
surface by drilling holes 30 mm upto a depth of 600 mm and bedded in a suitable bituminous grout or epoxy mortar,
per BS:873 (Part 4) 1973.
Unit = each
Taking output = 50 Nos.
a) Labour
0.00 Nos Mate 540.00 day
1.04 Nos Mazdoor (Unskilled) 510.00 day
b) Material
50.00 Nos Aluminum studs 100x100 mm fitted with lense reflectors 324.00 Each
Add 10 per cent of cost of material for fixing and installation.

13.615% d&e) Overheads & Contractors Profit


Cost for 50 studs = a+b+c+d

Road data- MoRTH-5th Revision 447524687.xlsx 319


Quantity Description of Item Rate per
Rate per stud = (a+b+c+d)/50
Rate per each

79 RBR-FNDN-4 : B-i : .Providing concrete for plain/reinforced concrete in open foundations using 40 mm nominal
Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curin
14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 17
2100 MORTH. : P.C.C grade M 15 (Design Mix) MORTH 12.8 A using 40 mm Graded Metal

Unit = cum
(a) Material
0.275 MT Cement 4600.00 MT
0.45 cum Coarse sand 1303.00 cum
0.54 cum 40 mm aggregate 799.95 cum
0.27 cum 20 mm aggregate 1256.20 cum
0.09 cum 10 mm aggregate 989.95 cum
(b) Labour
0.00 day Mate 540.00 day
0.10 day Mason (1st Class) 600.00 day
1.39 day Mazdoor (Unskilled) 510.00 day
(c) Machinery
0.40 hour Concrete mixer 0.4/0.28 cum capacity 472.60 hour
0.40 hour Generator 33 KVA 842.20 hour

4.00% d) Formwork @ 4% on cost of material, labour and


machinery (a+b+c)

13.615% e&f) Overheads & Contractors Profit


Rate per cum = a+b+c+d+e+f
Rate per 1 Cum

80 RBR-FNDN-4 : G : .Providing concrete for Reinforced concrete in open foundations using 20 mm nominal size Gr
hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14
complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 &
MORTH. : R.C.C. grade M 30 Design Mix, using 20 mm Graded Metal (MORTH 12.8 G) for Base slab of Box cul

Unit = cum
(a) Material
0.407 MT Cement 4600.00 MT
0.45 cum Coarse sand 1303.00 cum
0.54 cum 20 mm aggregate 1256.20 cum
0.36 cum 10 mm aggregate 989.95 cum
(b) Labour
0.00 day Mate 540.00 day
0.10 day Mason (1st Class) 600.00 day
1.39 day Mazdoor (Unskilled) 510.00 day
(c) Machinery
0.40 hour Concrete mixer 0.4/0.28 cum capacity 472.60 hour
0.40 hour Generator 33 KVA 842.20 hour

3.50% d) Formwork @ 3.5% on cost of material, labour and


machinery (a+b+c)

13.615% e&f) Overheads & Contractors Profit


Rate per cum = a+b+c+d+e+f
Rate per 1 Cum

Road data- MoRTH-5th Revision 447524687.xlsx 320


Quantity Description of Item Rate per
81 RBR-FNDN-5 : G : .Providing concrete for Reinforced concrete in sub structure using 20 mm nominal size Gr
hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14
complete as per drawings and Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 &
MORTH : R.C.C. grade M 30 Design Mix, using 20 mm Graded Metal (MORTH 12.8 G) for Walls of Box culvert

Unit = cum
(a) Material
0.41 MT Cement 4600.00 MT
0.45 cum Coarse sand 1303.00 cum
0.54 cum 20 mm aggregate 1256.20 cum
0.36 cum 10 mm aggregate 989.95 cum
(b) Labour
0.00 day Mate 540.00 day
0.10 day Mason (1st Class) 600.00 day
1.39 day Mazdoor (Unskilled) 510.00 day
(c) Machinery
0.40 hour Concrete mixer 0.4/0.28 cum capacity 472.60 hour
0.40 hour Generator 33 KVA 842.20 hour

10.00% d) Formwork @ 4% on cost of material, labour and


machinery (a+b+c)

13.615% e&f) Overheads & Contractors Profit


Rate per cum = a+b+c+d+e+f
Rate per 1 Cum

82 Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate (Co
aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance
materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incid
hire and operational charges of all T&P etc., complete as per approved drawings and as directed during executio
excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1600,1700 &
(5th revision ) and as directed by the Engineer-in-Charge for Deck slab

Unit = cum, Page 472 of MoRT&H SDB


Taking output = 15 cum
(A) Labour
0.86 nos Mate 540.00 day
1.50 nos Mason 600.00 day
20.00 nos Mazdoor 510.00 day
Total
(B) Material
8.10 cum Cost of 20mm SS-5 HBG M/C metal 1256.20 cum
5.40 cum Cost of 10mm SS-5 HBG M/C metal 989.95 cum
6.75 cum Sand 1303.00 cum
6.10 MT Cement at site 4600.00 MT
Total
© Machinery
6.00 hr Concrete mixer 0.4/0.28 cum 472.60 hr

Road data- MoRTH-5th Revision 447524687.xlsx 321


KODADA MUNICIPALITY
R 2018-19 ( BASED ON MoRTH 5th Revision )

Construction of Divider and central lighting

Amount
h hydraulic excavator of 0.9 cum bucket capacity including cutting and
and side slopes, in accordance with requirements of lines, grades and
the embankment location with all lifts and lead upto 1000 m as per
3 MORD / 301 MORTH

0.00
1060.80
###

10684.44

0.00
15066.00

0.00
26811.24
3650.35
30461.59
84.62

0.00
1591.20

5114.09
21611.52
2795.52
###

21591.75

Road data- MoRTH-5th Revision 447524687.xlsx 322


Amount

2352.00
55056.08
7495.89
62551.97
104.25

91.3
-34.2
0.00
57.10
###
ding well graded/ close graded HBG material confirming to Grading - III
all materials to work site and spreading in uniform layers with motor grader
mixing by mix in place method with Rotavator / approved means at OMC
eve the desired density etc., complete for finished item of work as per
nd as directed by the Engineer-in-charge.

0.00
1296.00
4080.00
5376.00

21611.52
5671.68
2096.64
17273.40
0.00

0.00
0.00
46653.24

115493.95
37197.60
156229.92
1764.00
310685.47
362714.71
49383.61
412098.32
1373.66

Road data- MoRTH-5th Revision 447524687.xlsx 323


Amount
graded HBG crushed stone aggregate to Wet Mix macadem specification (
ng cost of all materials and including premixing the material with water at
xed material by tipper to site , laying in uniform layers with paver in base
cting with Vibratory roller to acheive the desired density etc., as directed by
specification.406 (5th revision) for finished item of work.

0.00
1080.00
5100.00
6180.00
###
16591.68
8870.40
11061.12
15113.28
11227.71
2096.64
47520.00
112480.83

94143.95
112313.52
69048.05
1764.00
277269.52
395930.35
53905.92
449836.27
1999.27

men emulsion (SS2) Bulk using emulsion pressure distributor on prepared


of road surface and spraying emulsion at the rate of 0.60 kg/sqm using
of work etc., complete as per MoRT&H Specification 502 (5th revision) and

###

43.20
1020.00
1063.20

1119.55
1647.52
1926.40
698.88
5392.35

95796.75
588.00
96384.75
102840.30
102840.30
14001.71

Road data- MoRTH-5th Revision 447524687.xlsx 324


Amount
116842.01
33.38

en Emulsion (RS1) (Bulk) using Emulsion pressure distributor at the rate of


us surface cleaned with mechanical broom for finished item of work as per
as directed by the Engineer-in-Charge.

43.20
1020.00
1063.20

1119.55
1647.52
1926.40
4693.47

21068.25
21068.25
26824.92
26824.92
3652.21
30477.13
8.71

dam with 100 -120 TPH hot mix plant producing an average output of 75
e crushed aggregates of Grading - II as per table 500-7 of MoRT&H
ith bituminous binder of VG-30 grade @ 3.4 % by weight of total mixture,
epared surface with Hydrostatic paver finisher with sensor control to the
ed as per Clauses 501.6 and 501.7 to achieve the desired compaction for
neer-in-Charge including hire and opeational charges all T&P and all other
as per MoRTH specification No. 504 (5th Revision) .

453.60
8160.00

2700.00
11313.60

162429.12
1294.48
20559.91
12432.00
11061.12
5234.97

11227.71
7189.73

43200.00

Road data- MoRTH-5th Revision 447524687.xlsx 325


Amount
274629.04

588093.75

###
###

###
###

###
125731.47
99613.53
50132.50
863571.25
1149513.89
156506.32
1306020.21
6370.83

inous Macadam with 100 - 120 TPH batch type hot mix plant producing an
rd blasted granite crushed aggregates of Grading - II as per table 500-10
premixed with bituminous binder of VG 30 grade @ 4.50% of weight of total
usly prepared surface with a hydrostatic paver finisher with sensor control to
olled as per Clauses 501.6 and 501.7 to achieve the desired compaction for
neer-in-Charge including hire and operational charges all T&P and all other
of (excluding seigniorage) charges of all materials etc., complete in all
nd as per MoRT&H specification No. 505 (5th Revision)

Road data- MoRTH-5th Revision 447524687.xlsx 326


Amount
453.60
8160.00

2700.00
11313.60

162429.12
20559.91
12432.00
11061.12
5234.97

11227.71
7189.73
43200.00
273334.56

778359.38

###
93224.81
68935.45
99123.27
3523.66
1043166.57
1327814.73
1327814.73
180781.98
1508596.71
7736.39

e with 100 - 120 TPH batch type hot mix plant producing an average output
te crushed aggregates of Grading – II as per Table 500-17 of specification
h Bituminous binder of VG 30 Grade @ 5.4 % of mix and filler, transporting
tic sensor paver finisher to the required grade, level and alignment, rolling
ollers to achieve the desired compaction as per MoRT&H Specification 507
ork in all respects as directed by Engineer-in-Charge

453.60
8160.00

Road data- MoRTH-5th Revision 447524687.xlsx 327


Amount
2700.00
11313.60

162429.12
20559.91
12432.00
11061.12
5234.97
11227.71
7189.73
230134.56
###
###
934031.25
###
###
###

84603.62
60969.46
105553.31
3490.46
1188648.10
1430096.26
1430096.26
194707.61
1624803.87
8506.83

rfacing material ( Mixed seal surfacing) of 20 mm thickness by hot mix


aggregates of 13.2 mm to 0.09 mm (Type 'B') as per table 500-19 of
premixed with bituminous binder VG-30 (60/70) grade @ 19.00 Kg per 10
transporting the hot mix to work site, laying with mechanical paver finisher
rolling with smooth wheeled roller 8 to 10 Tonnes as per MoRT&H (5th
finished item of work in all respects as directed by Engineer-in-charge.

453.60
7140.00

2700.00
10293.60

256972.80
12432.00
11061.12
20559.91
8053.80

Road data- MoRTH-5th Revision 447524687.xlsx 328


Amount
309079.63

748570.31

244738.33

993308.64
1302388.27
177320.16
1479708.43
144.36

mix using 40mm size HBG crushed stone aggregate and fine aggregate
ding cost, conveyance of all materials to site and labour charges, centering,
c., including all other incidental and operational charges of all T&P etc.,
T&H specification 1500,1700, 2100 (5th Revision) and as directed by the
C Pavement.

345.60
540.00
7650.00
8535.60

10799.33
8795.25
11178.00
30772.58

2835.60
5053.20
1397.76
9286.56
48594.74
6616.17
55210.91
3680.73

mix using 40mm size HBG crushed stone aggregate and fine aggregate
ding cost, conveyance of all materials to site and labour charges, centering,
c., including all other incidental and operational charges of all T&P etc.,
T&H specification 1500,1700, 2100 (5th Revision) and as directed by the
C Pavement.

345.60
540.00
7650.00
8535.60

10799.33
8795.25
15870.00
35464.58

Road data- MoRTH-5th Revision 447524687.xlsx 329


Amount
2835.60
5053.20
1397.76
9286.56
53286.74
7254.99
60541.73
4036.12
1 Cum
d, plain cement concrete pavement, thickness as per design, over a
or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine
m in a concrete mixer of not less than 0.2 cum capacity and appropeiate
aid in approved fixed side form work (steel channel, laying and fixing of 125
tes including levelling the formwork as per drawing), spreading the concrete
, scareed and plate vibrators and finished in continuous operation including
truction joints, applying debonding strips, primer, sealant, near approaches
admixtures as approved, curing of concrete slabs for 14- days, curing
ing to lines and grade as per drawing and Technical Specification Clause

0.00
0.00
0.00
472.60
472.60
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
729.00
0.00

0.00

510.00

0.00
0.00

0.00

0.00

600.00
Road data- MoRTH-5th Revision 447524687.xlsx 330
Amount
0.00
10.00

0.00

0.00
0.00
0.00
0.00

3.00%

ng 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate


e conforming to table 1000-2) including cost, conveyance of all materials to
e mixing, laying, vibrating, curing etc., including all other incidental and
for finished item of work as per MoRT&H specification 1500, 1700, 2100
e Engineer-in-Charge for C.C Pavement.

464.40
810.00
10200.00
11474.40

10175.22
5345.73
8795.25
27600
51916.2

2835.60
5053.20
7888.80
71279.40

2494.78
73774.18
10044.35
83818.53
5587.90

Road data- MoRTH-5th Revision 447524687.xlsx 331


Amount
ase over a prepared sub-grade with coarse and fine aggregate conforming
exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate
00-1, cement content not to be less than 150 kg/ cum, optimum moisture
nstruction, concrete strength not to be less than 10 Mpa at 7 days, mixed in
a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller,
of work as per MoRT&H (5th Revision) specification 1500,1700 & 601 (5th
-Charge for base coarse below CC Pavement.

604.80
3240.00
11220.00
15064.80

476109.90

264509.00
310500.00
1051118.90
###
11061.12
7977.60
7566.72
20559.91
23031.20
5591.04
75787.59
1141971.29
155479.39
1297450.68
2883.22

plain cement concrete pavement M30 grade over a prepared sub base with
nd fine aggregate conforming to IS 383, maximum size of coarse aggregate
nd mixing plant as per approved mix design, transported to site, laid with a
ed and finished in a continuous operation including provision of contraction,
s, joint filler, separation membrane, sealant primer, joint sealant, debonding
ed, curing compound, finishing to lines and grades as per drawing complete
Revision) specification 1500,1700 & 602 (5th Revision) and as directed

0.00
2820.00
2700.00
76500.00
3240.00
0.00
3060.00
0.00

Road data- MoRTH-5th Revision 447524687.xlsx 332


Amount
88320

14310.00
0.00
0.00
432.00
3494.40
1176.80
19413.20

0.00

55963.71
26276.60
43976.25
120750.00
7012.50
0.00

0.00
390.00
2071.00
0.00
0.00
0.00
1764.00
2187.00

260391.06
368124.26
11043.73
379167.99
51623.72
430791.71
5743.89

at expansion and construction joint only, plain cement concrete pavement,


base, with 43 grade cement or any other type as per Clause 1501.2.2 M30
orming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum
g approved mix design, laid in approved fixed side formwork (steel channel,
e film, wedges, steel plates including levelling the formwork as per drawing),
es, compacted using needle, scareed and plate vibrators and finished in
contraction and expansion, construction joints, applying debonding strips,
to bridge / culvert and construction joints, admixtures as approved, curing of
nd (where specified) and water finishing to lines and grade as per drawing
nical Specification Clause 1501 MORD.

Road data- MoRTH-5th Revision 447524687.xlsx 333


Amount

0.00
2820.00
2700.00
76500.00
3060.00
1800.00
3240.00
564.00

0.00
17013.60

1950.30
3150.00
0.00
0.00
3494.40
3228.80
0.00
0.00

42396.75

34348.50
7012.50
0.00

153.23

0.00
1482.00
0.00
0.00

0.00

0.00

0.00
1764.00
3066.00

209744.08
6292.32
216036.40
29413.36
245449.76
3272.66

Road data- MoRTH-5th Revision 447524687.xlsx 334


Amount
by mechanical means for foundations of structures as per drawing and
onstruction of shoring and bracing, removal of stumps and other deleterious
the excavation earth to the extent required etc., complete for finished item
per MoRT&H specification 304 (5th Revision) and as directed by the

172.80
0.00
172.80

17807.40

17980.20
2448.00
20428.20
85.12

ar material below the pipes of Hume pipe culverts suitably compacted /


aterials to site etc., complete as per drawing and MoRT&H Specification
ngineer-in-Charge.

151.20
0.00
151.20

1779.12
1779.12

134.40
34.94
169.34
2099.66
285.87
2385.53
238.55

mix using 40mm size HBG crushed stone aggregate and fine aggregate
ding cost, conveyance of all materials to site and labour charges, centering,
c., including all other incidental and operational charges of all T&P etc.,
T&H specification 1500,1700, 2100 (5th Revision) and as directed by the

345.60
510.00
0.00
855.60

10799.33
8479.35
3950.08
23228.76

Road data- MoRTH-5th Revision 447524687.xlsx 335


Amount
2835.60
5053.20
1397.76
9286.56
33370.92
4543.45
37914.37
2527.62

) using 40mm size HBG crushed stone aggregate and fine aggregate
ding cost, conveyance of all materials to site and labour charges, centering,
., including all other incidental and operational charges of all T&P etc.,
T&H specification 1500,1700, 2200 (5th Revision) and as directed by the

345.60
510.00
0.00
855.60

10799.33
8479.35
3950.08
23228.76

2835.60
5053.20
1397.76
9286.56
33370.92

3337.09
36708.01
4997.80
41705.81
2780.39

e Hume pipes of 1000mm / 800 mm / 600 mm Dia., NP-3 class for pipe
pes etc., complete and Labour charges for laying, jointing of 1000 mm / 800
ition including lifting, aligning, lowering and hoisting etc., as per drawing and
nd 2906 (5th Revision) and IRC Special Publication No: 13 and as directed
work.

###
###

75.60
255.00
0.00
330.60

31627.88
31627.88
31958.48
4351.15
36309.63

Road data- MoRTH-5th Revision 447524687.xlsx 336


Amount
2904.77

97.20
255.00
0.00
352.20

51361.13
51361.13
51713.33
7040.77
58754.10
4700.33

###

97.20
255.00
0.00
352.20

80194.75
80194.75
80546.95
10966.47
91513.42
7321.07

e Hume pipes of 1000mm / 800 mm / 600 mm Dia., NP-4 class for pipe
pes etc., complete and Labour charges for laying, jointing of 1000 mm / 800
ition including lifting, aligning, lowering and hoisting etc., as per drawing and
nd 2906 (5th Revision) and IRC Special Publication No: 13 and as directed
work.

75.60
255.00
0.00
330.60

36640.38
36640.38
36970.98
5033.60
42004.58
3360.37

97.20
255.00
0.00

Road data- MoRTH-5th Revision 447524687.xlsx 337


Amount
352.20

62625.88
62625.88
62978.08
8574.47
71552.55
5724.20

97.20
255.00
0.00
352.20

106015.00
106015.00
106367.20
14481.89
120849.09
9667.93

cluding cost and conveyance of all materials to site etc., complete as per
T&H Specification No. 2200 & 2907 (5th Revision) and as per Drawing and
ork.

151.20
0.00
151.20

1779.12
1779.12

134.40
34.94
169.34
2099.66
285.87
2385.53
238.55

uding cost and conveyance of materials to site and including labour charges
omplete for finished item of work as per MoRT&H specification 2504 ( 5th
Charge for Pitching of slopes

21.60
178.50
0.00
200.10

258.70
Road data- MoRTH-5th Revision 447524687.xlsx 338
Amount
25.45
284.15
484.25
65.93
550.18
550.18

per I cum

21.60
178.50
0.00
200.10
133.40

258.70
25.45
284.15
417.55
56.85
474.40
474.40

ravel underneath pitching in slopes including cost and conveyance of


., complete for finished item of work as per MoRT&H Specification 2504 (5th
Charge

27.00
127.50
0.00
154.50

177.91
332.41
45.26
377.67
377.67

crete using 40mm , 20mm and 10mm size HBG crushed stone aggregate
0-1 and fine aggregate conforming to table 1000-2) including cost and
bour charges for machine mixing,laying in position, Compacting , Vibrating
ll other operational charges of T&P required etc., complete as per MoRT&H
for footings and Raft foundation .

464.40
765.00
0.00
1229.40

6479.60
5087.61
Road data- MoRTH-5th Revision 447524687.xlsx 339
Amount
1336.43
8795.25
18998.00
40696.89

2835.60
5053.20
7888.80
49815.09

1992.60
51807.69
7053.62
58861.31
3924.09

crete using 40mm , 20mm and 10mm size HBG crushed stone aggregate
0-1 and fine aggregate conforming to table 1000-2) including cost and
abour charges for machine mixing, laying in position,Compacting, Vibrating
ll other operational charges of T&P required etc., complete as per MoRT&H
for Sub structure .

464.40
765.00
0.00
1229.40

6479.60
5087.61
1336.43
8795.25
18998.00
40696.89

2835.60
5053.20
7888.80
49815.09

4981.51
54796.60
7460.56
62257.16
4150.48

grade using 20mm & 10mm HBG crushed stone aggregate (Coarse
e aggregate conforming to table 1000-2) including cost, conveyance of all
ng, machine mixing, laying, vibrating, curing etc., including other incidental
r approved drawings and as directed during execution but excluding cost of
em as per MoRT&H specification 1500,1600,1700 & 2100 (5th revision )
r for foundations

464.40
765.00

Road data- MoRTH-5th Revision 447524687.xlsx 340


Amount
0.00
1229.40

10175.22
5345.73
8795.25
23552.00
47868.20

2835.60
5053.20
7888.80
56986.40

2279.46
59265.86
8069.05
67334.91
4488.99

Road data- MoRTH-5th Revision 447524687.xlsx 341


Amount
mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming
ng to table 1000-2) including cost, conveyance of all materials to site and
aying, vibrating, curing etc., including other incidental hire and operational
ngs and as directed during execution but excluding cost of steel and its
MoRT&H specification 1500,1600,1700 & 2200 (5th revision ) and as
locks & Backing walls (Sub-structure)

0.00
51.00
0.00
51.00

753.72
296.99
586.35
1577.80
3214.86

189.04
402.88
591.92
3857.78
525.24
4383.02

154.31
4012.09
546.25
4558.34
4558.34

grade using 20mm & 10mm HBG crushed stone aggregate (Coarse
e aggregate conforming to table 1000-2) including cost, conveyance of all
ng, machine mixing, laying, vibrating, curing etc., including other incidental
complete as per approved drawings and as directed during execution but
ges for finished item as per MoRT&H specification 1500,1600,1700 & 2300
eer-in-Charge for Deck slab

0.00
51.00
0.00
51.00

678.35
356.38
586.35
1596.20
3217.28

189.04
402.88

Road data- MoRTH-5th Revision 447524687.xlsx 342


Amount
591.92
3860.20

154.41
4014.61
546.59
4561.20
4561.20

Road data- MoRTH-5th Revision 447524687.xlsx 343


Amount
grade using 20mm & 10mm HBG crushed stone aggregate (Coarse
e aggregate conforming to table 1000-2) including cost, conveyance of all
g, machine mixing, laying, vibrating, curing etc., including all other incidental
mplete for finished item of work as per drawing BD/1-69( A) but excluding
er MoRT&H specification 1500, 1600,1700, & 2702 (5th Revision) and
aring coat over Deck slab.

486.00
765.00
0.00
1251.00

10175.22
5345.73
8795.25
28060.00
52376.20

2835.60
6043.20
8878.80
0.00
62506.00
8510.19
71016.19
4734.41

grade using 20mm & 10mm HBG crushed stone aggregate (Coarse
e aggregate conforming to table 1000-2) including cost, conveyance of all
g, machine mixing, laying, vibrating, curing etc., including all other incidental
plete for finished item of work as per Approved drawing but excluding cost
MoRT&H specification 1500, 1600,1700, & 2704 (5th Revision) and as
ach slab.

464.40
765.00
0.00
1229.40
###
###
10175.22
5345.73
8795.25
27830.00
52146.20

2835.60
6043.20
8878.80
62254.40

1245.09

Road data- MoRTH-5th Revision 447524687.xlsx 344


Amount
63499.49
8645.46
72144.95
4809.66

0 grade using HBG crushed stone aggregate of size not exceeding 12 mm


-2 true to line and grade, tolerance of vertical RCC post not to exceed 1 in
al posts not to exceed 2000mm, leaving adequate space between vertical
nce of all materials to site and labour charges, centering, machine mixing,
ncidental hire and operational charges of all T&P as per approved drawings
ng cost of steel and its fabrication charges as per approved drawings and
rk as per MoRT&H Specification 2703, 1500, 1600, 1700 (5th Revision)

464.40
765.00
0.00
1229.40

9274.10
5345.73
8795.25
23552.00
46967.08

2835.60
6043.20
8878.80
57075.28

6849.03
63924.31
8703.29
72627.60
4841.84

1879.12
278.80
278.80

cum
cum
###
cum
cum

Road data- MoRTH-5th Revision 447524687.xlsx 345


Amount
###
3280.83
257.95
257.95

rete using 40mm , 20mm and 10mm size HBG crushed stone aggregate
0-1 and fine aggregate conforming to table 1000-2) including cost and
bour charges for machine mixing,laying in position, Compacting , Vibrating
ll other operational charges of T&P required etc., complete as per MoRT&H
ision) for levelling course

464.40
765.00
0.00
1229.40

6479.60
5087.61
1336.43
8795.25
18998.00
40696.89

2835.60
5053.20
7888.80
49815.09
6782.32
56597.41
3773.16

stone (HBG) of not less than 300 mm size grouted with 0.20 cum of CC
materials to site and including labour charges for packing the stones for
work as per MoRT&H specification 2504 ( 5th revision ) and as directed by
ment.

345.60
510.00
0.00
855.60

10799.33
8795.25
11178.00
30772.58

2835.60
5053.20
1397.76
9286.56
40914.74
2727.65

Road data- MoRTH-5th Revision 447524687.xlsx 346


Amount

21.60
178.50
0.00
200.10
sand
545.53
350.60
896.13
1096.23
149.25
1245.48
1245.48

including cost ,conveyance of all materials to site etc., complete as per


&H Specification No. 2200 (5th Revision) and as per Drawing and technical

151.20
0.00
151.20

1779.12
1779.12

3257.50
34.94
3292.44
5222.76
711.08
5933.84
593.38

50% of 150 mm IRC soling stone and 50 % of 40 mm HBG metal


e 2504.2.2 of MoRT&H specifications to athickness of not less than 600mm
er size towards the wall and provided over the entire surface behind the
height compacted to a firm condition including cost and conveyance and all
mental officers as per drawing and Technical specifications as per clause
&H (5th Revision) for finished item of work.

172.80
0.00
540.00
712.80

1552.20
4799.70
6351.90

Road data- MoRTH-5th Revision 447524687.xlsx 347


Amount
41.93
41.93
7106.63
967.57
8074.20
807.42

diameters, wrought and put up bars of all diameters including cost and
ges for fabrication of reinforcement including cutting, bending, binding rods,
lete including cost and conveyance of binding wire and all handling charges
ver lapping welding if required etc., complete for all R.C.C items for finished
r the directions of the Engineer-in-Charge and as per MoRT&H specification
786 of 1985 for Super structure of R.C.C items.

237.60
1692.00
0.00
1929.60

48300.00
400.00
48700.00
50629.60
6893.22
57522.82
57.52

diameters, wrought and put up bars of all diameters including cost and
ges for fabrication of reinforcement including cutting, bending, binding rods,
lete including cost and conveyance of binding wire and all handling charges
ver lapping welding if required etc., complete for all R.C.C items for finished
r the directions of the Engineer-in-Charge and as per MoRT&H specification
786 of 1985 for Sub structure of R.C.C items.

183.60
1128.00
0.00
1311.60

48300.00
300.00
48600.00
49911.60
6795.46
56707.06
56.71

Road data- MoRTH-5th Revision 447524687.xlsx 348


Amount
diameters, wrought and put up bars of all diameters including cost and
ges for fabrication of reinforcement including cutting, bending, binding rods,
lete including cost and conveyance of binding wire and all handling charges
ver lapping welding if required etc., complete for all R.C.C items for finished
r the directions of the Engineer-in-Charge and as per MoRT&H specification
786 of 1985 for foundations of R.C.C items.

216.00
1128.00
0.00
1344.00

48300.00
300.00
48600.00
49944.00
6799.88
56743.88
56.74

) of different diameters, wrought and put up bars of all diameters including


labour charges for fabrication of reinforcement including cutting, bending,
ition etc., complete including cost and conveyance of binding wire and all
c., and including over lapping welding if required etc., complete for all R.C.C
ard drawings, as per the directions of the Engineer-in-Charge and as per
ion) and as per I.S.1786 of 1985 .

151.20
846.00
0.00
997.20

48300.00
300.00
48600.00
49597.20
6752.66
56349.86
56.35

conveyence of all materials to site and watering, tamping etc., complete for
ation 304 (5th Revision) and as directed by the Engineer - in - Charge.

5.40
0.00
5.40

1563.60
1569.00
213.62
1782.62
1 cum

Road data- MoRTH-5th Revision 447524687.xlsx 349


Amount
crete using 40mm , 20mm and 10mm size HBG crushed stone aggregate
0-1 and fine aggregate conforming to table 1000-2) including cost and
abour charges , centering, machine mixing, laying in position,Compacting,
ntal and all other operational charges of T&P required etc., complete as per
Revision) for Dividers .

464.40
765.00
0.00
1229.40

6479.60
5087.61
1336.43
8795.25
18998.00
40696.89

2835.60
5053.20
7888.80
49815.09

1992.60
51807.69
7053.62
58861.31
3924.09
1 Cum
grade using 20mm & 10mm HBG crushed stone aggregate (Coarse
ne aggregate conforming to table 1000-2) including cost, conveyance of all
ng, machine mixing, laying, vibrating, curing etc., including other incidental
r approved drawings and as directed during execution but excluding cost of
em as per MoRT&H specification 1500,1600,1700 & 2200 (5th revision )
r Cover slabs over side drains

464.40
765.00
0.00
1229.40

10175.22
5345.73
8795.25
23552.00
47868.20

2835.60
5053.20
7888.80
56986.40

2279.46

Road data- MoRTH-5th Revision 447524687.xlsx 350


Amount
59265.86
8069.05
67334.91
4488.99
1 Cum
g cost and conveyance of all materials , labour charges , curing etc
by the Engineer -in-Charge

21.60
255.00
0.00
276.60

400.83
677.43
92.23
769.66
76.97

###
###

h synthetic enamel paint in all shades on new plastered concrete surfaces

64.80
1296.00
0.00
1360.80

1140.00
2500.80
340.48
2841.28
71.03

nsion joints etc., complete for finished item of work.

991.000
1Sqm

nsion joints etc., complete for finished item of work.

Road data- MoRTH-5th Revision 447524687.xlsx 351


Amount
568.000
1Sqm

ls obtained from side earth having MDD of not less than 1.75 gms/cc by
ding pre-watering of soil at borrow area, removal of top soil, excavation of
depositing the soils on the embankment, spreading soils, breaking clods,
ad roller @ OMC to meet requirement of table 300-2 of MORT&H including
omplete for finished item of work as per MORT&H specification 305 (5th
vels for finished item of work)

10.20
0.00
10.20

4956.39

0.00
0.00
1330.60
2795.52
2878.90
11961.41
0.00
11971.61
1629.93
13601.54
136.02

clected earth having MDD of not less than 1.75 gms/cc from outside road
and lifts including pre-watering of soil at borrow area, removal of top soil,
eyance of soil, depositing the soils on the embankment, spreading soils,
with vibratory road roller @ OMC to meet requirement of table 300-2 of
charges of T&P , complete for finished item of work as per MORT&H
be made based on levels for finished item of work)

20.40
0.00
20.40

4956.39

9600.00
960.00

1330.60
2795.52
2878.90
22521.41
0.00
22541.81
3069.07

Road data- MoRTH-5th Revision 447524687.xlsx 352


Amount
25610.88
256.11

verts , bridges, retaining walls and other structures comprising of masonry,


ncluding T&P and scaffolding wherever necessary sorting the dismantled
and stacking the materials with all lifts and lead of 1000 m ( By Mechanical
0) as per MoRTH specification 202 , 2.4 II (A) (5th revision)

10.80
162.00
0.00
172.80

910.33

93.15
1003.48
1176.28
160.15
1336.43
1069.14
1 Cum
e Masonry in Cement Mortar by mechanical means including T&P and
dismantled material, disposal of unserviceable materials and stacking the
per MoRTH specification 202 , 2.4 III (B) (5th revision)

16.20
0.00
16.20

93.15
93.15
109.35
14.89
124.24
99.39
1 Cum
uprooting rank vegetation, grass, bushes, shrubs, sapling and trees girth
earlier and disposal of unserviceable materials and stacking of serviceable
of 1000 m including removal and disposal of top organic soil not exceeding
ea of light jungle.

86.40
0.00
86.40

26612.00

Road data- MoRTH-5th Revision 447524687.xlsx 353


Amount
345.00
26957.00
27043.40
3681.96
30725.36
3.07
1 Sqm
removal of picked up chips to road side spreading old useful metal to road
camber etc., including cost and conveyance of stone dust blindage @ 0.25
ng rolling with 8 to 10 t capacity power roller complete for finished item of

7.00
16.596
0.000
0.000
23.60
23.60

hanical means and disposal of dismantled materials up to a lead of 1000


ble materials separately as directed by the Engineer-in-Charge and as per

5.40
0.00
5.40

131.10
10.00
141.10
146.50
19.95
166.45
166.45

turn walls and wing walls with 100mm Diameter AC pipe extending through
in both horizontal and vertical direction so that the weep holes in each
ep holes laying above and below lines as shown in drawing including cost
charges for cutting to required length, placing the pipe with a slope of about
plete for finished item of work for weep holes as per MoRT&H specification

2346.00
1368.15
3714.15

21.60
0.00
21.60

Road data- MoRTH-5th Revision 447524687.xlsx 354


Amount
3735.75

9198.00
292.00
390.00
186.79
10066.79

16.20
324.00
0.00
340.20
10406.99
1416.91
11823.90
394.13

e 125 micron and as per ISI standard specification duly fixing over CC(1:4:8)
c., complete and as directed by the Engineer-in-Charge during execution of

17.00
17.00

ng blasting by mechanical means for road cutting ., complete including


as per MoRT&H specification 301(5th Revision) and as directed by the
ed earth on valley side.

264.60
0.00
1296.00
169.50
1730.10

15967.20
2942.00
18909.20

2625.00
1120.00
3745.00
24384.30
3319.92
27704.22
162.97

complete as per MoRT&H specification No. 2705 (5th Revision) and as per

10.80
12.00
0.00
22.80

Road data- MoRTH-5th Revision 447524687.xlsx 355


Amount

5.40
5.40
0.00
10.80
33.60

178.00
536.00
138.00
390.00
1242.00
63.78

1339.38
1395.78
190.04
1585.82

bed for protection against scour with stone boulders weighing not less than
TH specification 2503.2 (5th revision)

21.60
189.00
0.00
210.60

392.45
25.45
417.90
628.50
85.57
714.07
714.07

ng 40 to 45mm HBG metal with required quantity of 10 to 12mm size HBG


en per one cum of work for filling the pot holes including removal of loose
o provide form vertical faces cleaning applying tack coat filling the pot holes
d conveyance of materials, T&P charges and all labour charges for all
work as directed by the Engineer-in-charge in the following reaches.

0.00
0.00

362.42
362.42

959.94
125.17
1378.81
2463.92
2826.34

Road data- MoRTH-5th Revision 447524687.xlsx 356


Amount
384.81
3211.15
3211.15

ing 20 mm HBG machine crushed metal with required quantity of 10 to


de bitumen at 72 Kgs / 1 cum of work for filling the pot holes including
mming the edges to provide form vertical faces, cleaning, applying tack coat,
Road roller of 8 to 10 T and finishing including cost and conveyance of
s for all operations etc., complete for finished item of work as directed by the

0.00
0.00

362.42
362.42

1507.44
125.17
1632.61
3265.22
3627.64
493.90
4121.54
4121.54

genial for plants grouth of light textured, crystalline, porous and friable,
ile, cost, transportation, loading, unloading etc complete
115.26
15.69
130.95

d good earth in required thickness (cost of sludge, farm yard manure or/and
ation 307 MORTH

0.00
0.00
0.00
0.00
0.00
0.00

ocal materials (Table 400.13) by mix in place method normal Construction of


spreading in uniform layers with motor grader on prepared surface, mixing
e and compacting with smooth wheel roller to achieve the desired density
al Specification Clause 408 MORD.

0.00
1339.20

Road data- MoRTH-5th Revision 447524687.xlsx 357


Amount
0.00
1339.20

21611.52
40269.00
4140.00
3494.40
69514.92

22772.74
141684.48
2940.00
167397.22
238251.34
32437.92
270689.26
902.30

pplied Thermoplastic Compound with Reflectorising Glass Beads on


of hot applied thermoplastic compound 2.5 mm thick including reflectorising
ness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35
free from streaks and holes as per Specification 803 MORTH

0.00
397.80
397.80

1243.20
232.40
1475.60

316500.00
34350.00
350850.00
352723.40
48023.29
400746.69
667.91
with Lens Reflector : Providing and fixing of road stud 100 x 100 mm die
of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic
of 600 mm and bedded in a suitable bituminous grout or epoxy mortar, all as

0.00
530.40

16200.00
1620

18350.40
2498.41
20848.81

Road data- MoRTH-5th Revision 447524687.xlsx 358


Amount
416.98
416.98
###
plain/reinforced concrete in open foundations using 40 mm nominal size
mixed, placed in foundation and compacted by vibration including curing for
cal specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 &
ix) MORTH 12.8 A using 40 mm Graded Metal

1265.00
586.35
431.97
339.17
89.10

0.00
60.00
708.90

189.04
336.88
4006.41
160.26

4166.67
567.29
4733.96
4733.96

einforced concrete in open foundations using 20 mm nominal size Graded


aced in foundation and compacted by vibration including curing for 14 days
cifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100
sing 20 mm Graded Metal (MORTH 12.8 G) for Base slab of Box culvert

1872.20
586.35
678.35
356.38

0.00
60.00
708.90

189.04
336.88
4788.10
167.58

4955.68
674.72
5630.40
5630.40

Road data- MoRTH-5th Revision 447524687.xlsx 359


Amount
Reinforced concrete in sub structure using 20 mm nominal size Graded
aced in foundation and compacted by vibration including curing for 14 days
2, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200
ing 20 mm Graded Metal (MORTH 12.8 G) for Walls of Box culvert

1872.20
586.35
678.35
356.38

0.00
60.00
708.90

189.04
336.88
4788.10
478.81

5266.91
717.09
5984.00
5984.00

grade using 20mm & 10mm HBG crushed stone aggregate (Coarse
e aggregate conforming to table 1000-2) including cost, conveyance of all
ng, machine mixing, laying, vibrating, curing etc., including other incidental
complete as per approved drawings and as directed during execution but
ges for finished item as per MoRT&H specification 1500,1600,1700 & 2300
eer-in-Charge for Deck slab

464.40
900.00
10200.00
11564.40

10175.22
5345.73
8795.25
28060.00
52376.20

2835.60

Road data- MoRTH-5th Revision 447524687.xlsx 360


Sno. Code Description Units
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity in
RBR- cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirem
1 EECD-
5 lines, grades and cross-sections, and transporting to the embankment location with all li
lead upto 1000 m as per Technical Specification Clause 302.3 MORD / 301 MORTH
Unit = cum
Taking output = 360 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 2.08
b) Machinery
Hydraulic excavator 0.9 cum bucket capacity hour
3.60
@ 100 cum/ hour
Tipper 5.5 cum capacity, 4 trips per hour hour 15.00

c&d) Overheads & Contractors Profit 13.62%


Cost for 360 cum = a+b+c+d
Rate per cum = (a+b+c+d)/360

RBR- Loosening of the ground upto a level of 300 mm below the subgrade level, watered, grad
2 EECD- compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construc
16-ii per Technical Specification Clause 303.5.2 MORD / 305 MORTH.
Unit = cum
Taking output = 600 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 3.12
b) Machinery
Tractor with ripper attachment hour 9.00
Motor grader for grading hour 6.00
Water tanker 6 kl capacity hour 4.00
Three wheel 80-100 kN Static Roller @70 hour 8.60
cum per hour
OR
Vibratory road roller 8-10 tonnes @ 80 cum hour 7.50
per hour
c) Material
Water kl 24.00

d&e) Overheads & Contractors Profit 13.615%


Cost for 600 cum = a+b+c+d+e (Vibratory
Roller)
Rate per cum = (a+b+c+d+e)/600

Conveyence of excavated earth up to 5.00


3 km lead including loading and unloading
charges etc.
conveyence charges
loading charges by manual

Granular Sub-Base with Coarse Graded


4
Material (Table:- 400- 2)
Construction of Granular sub-base by providing coarse graded material grade-III , sprea
RBR-SBBS-1-1-A- uniform layers with motor grader on prepared surface, mixing by mix in place method with ro
iii at OMC, and compacting with vibratory roller to achieve the desired density, complete
clause 401 MORTH.
Unit = cum
Taking output = 300 cum
a) Labour
Mate day -
Mazdoor skilled day 2.40
Mazdoor day 8.00
b) Machinery
Mortar Grader 110 HP @ 50 cum per hour hour 6.00
Three wheel 80-100 kN static roller @ 10 30.00
cum per hour
OR

Vibratory roller 8 -10 tonne hour 6.00


Tractor with Rotavator 25 cum per hour 12.00
Water tanker 6 KL capacity hour 3.00
c) Material
well graded/ close graded sub-base Materials
per table 400-1
9.5 mm to 4.75 mm @ 66 per cent cum 255.00
2.36 mm below @ 34 per cent (Dust) cum 129.00
OR
9.5 mm to 4.75 mm @ 35 per cent 134.40
4.75mm to 2.36mm @12.5 per cent 48.00
2.36 mm below @ 52.5 per cent 201.60
Cost of water KL 18.00

d&e) Overheads & Contractors Profit 13.62%


Cost for 300 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/300
Note : Any one of the grading for material
may be adopted as per design

Providing, laying, spreading and compacting graded stone aggregate to wet mix ma
specification including premixing the material with water at OMC in mechanical mixer (Pu
RBR- carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base cour
5 SBBS- well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vib
11 Roller 80-100 kN weight to achieve the desired density including lighting, barricadi
maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification
406 MORD / MORTH.
B R&B and Urban Area Works :
Unit = cum
Taking output = 225 cum (495 tonnes)
a) Labour
Mate day -
Mazdoor skilled day 2.48
Mazdoor day 10.00
b) Machinery
Wet mix plant of 75 tonne hourly capacity hour 9.00
Electric generator 125 KVA hour 6.00
Front end loader 1 cum capacity hour 6.00
Paver finisher hour 6.00
Vibratory roller 8 - 10 tonne hour 3.90
or
Smooth 3 wheeled steel roller @ 8-10 tonnes. hour
22.50
Water tanker 6 KL capacity hour 3.00
Tipper 10t (495Tonnes* 10kms) t.km 4950.00
c) Material ( Table 400-11)
45 mm to 22.4 mm@ 30 per cent cum 89.10
22.4 mm to 2.36 mm @ 40 per cent cum 118.80
2.36 mm to 75 micron@ 30 per cent cum 89.10
Cost of water KL 18.00

d&e) Overheads & Contractors Profit 13.62%


Cost for 225 cum = a+b+c+d+e (Smooth
Roller)
Rate per cum = (a+b+c+d+e)/225
Note : 1. Though vibratory roller is required only for 3
hours as per
2. As three wheelednorms, the steel
smooth samerollers
is required to be
are commonly
available at site for 6 hours to match
in use, the same has been provided as an alternative with other
machines.
which The
canand usage
be applying rates
used if the of vibratory
thickness roller may
of individual be
layer
Providing
multiplied with a factor primer
of 0.65 coat with bitumen emulsion (SS2) on prepared surface of g
RBR- does not exceed 100 mm.
6 BASC- Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm
1(b) mechanical means as per Tech. specification No 502 MORTH.
Unit = sqm
Taking output = 3500 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 2.080
b) Machinery
Mechanical broom @ 1250 sqm per hour hour 2.800
Air compressor 250 cfm hour 2.800
Bitumen pressure distributor @ 1750 sqm per hour 2.000
hour
Water tanker 6 KL capacity @ 1 trip per hour hour 1.000

c) Material
Bitumen emulsion @ 0.6 kg per sqm t 2.100
Requirement of Water KL 6.000

d&e) Overheads & Contractors Profit 13.615%


Cost for 3500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/3500
Note : Bitumen primer has been provided @ 0.60 kg per sqm as per clause 502.8. Payme
be made with adjustment, plus or minus, for the variation between this quantity and the
Providing and applying tack coat with bitumen emulsion (RS-1)using emulsion pressure dis
RBR-
7 BASC- at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleane
2(5) mechanical broom as per Tech. specification No 503 MORTH
Unit = sqm
Taking output = 3500 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 2.080
b) Machinery
Mechanical broom @ 1250 sqm per hour hour 2.800
Air compressor 250 cfm hour 2.800
Emulsion pressure distributor @ 1750 sqm hour 2.000
per hour
c) Material
Bitumen emulsion @ 0.2 kg per sqm t 0.700

d&e) Overheads & Contractors Profit 13.615%


Cost for 3500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/3500

Providing and laying bituminous macadam with 100-120 TPH / 40-60 TPH hot mi
producing an average output of 75 tonnes/ 37.50 t per hour using crushed aggregates of sp
grading premixed with bituminous binder, transported to site, laid over a previously pr
RBR- surface with paver finisher to the required grade, level and alignment and rolled as per
BASC-
3=ii 501.6 and 501.7 to achieve the desired compaction as per Tech. specification No. 504 MOR
Unit = cum
Taking output = 205 cum (450 tonnes)(VG-
30)
a) Labour
Mate day -
Mazdoor working with HMP, mechanical day 14.00
broom, paver, roller, asphalt cutter and
assistance for setting out lines, levels and
layout of construction
Skilled mazdoor for checking line & levels day 5.84
b) Machinery
Batch mix HMP 100-120 TPH @ 75 tonne hour 6.00
per hour actual output
OR
HMP 40-60 TPH @ 17 cum (37.5 Tonnes) / hour
hour 12.00
Air compressor 250 cfm hour 2.20
Paver finisher 100 TPH hour 6.00
Generator 250 KVA hour 6.00
Front end loader 1 cum bucket capacity hour 6.00
Smooth wheeled roller 8-10 tonnes for initial hour 3.90
break down rolling.
Vibratory roller 8 tonnes for intermediate hour 3.90
rolling.
Finish rolling with 6-8 tonnes smooth wheeled hour 3.90
tandem roller.
c) Material
i) Bitumen@ 3.3 per cent of mix t 14.85
weight of mix = 205 x 2.2 = 450 tonne
ii) Aggregate
Total weight of mix = 450 tonnes
Weight of bitumen = 14.85 tonnes
Weight of aggregate = 450 -14.85 = 435.15
tonnes
Taking density of aggregate = 1.5 ton/cum

Volume of aggregate = 290.1 cum


Grading II (19 mm nominal size)
116.04 Cum of 25-10mm @ 40%
25 to 27mm IRC HBGM/C metal @ 40% cum 29.01
19 to 22mm IRC HBGM/C metal @ 10% cum 29.01
12 to 14mm IRC HBGM/C metal @ 10% cum 29.01
9.5 to 11.2mm IRC HBGM/C metal @ 10% cum 29.01

116.04 Cum of 10-5mm @ 40%


9.5 to 11.2mm IRC HBGM/C metal @ 20% cum 58.02

5 to 7mm IRC HBGM/C metal @ 20% cum 58.02


58.02 Cum of 5mm below @ 20%
5 to 7mm IRC HBGM/C metal @ 10% cum 29.01
2.36mm & below @ 10% cum 29.01
* Any one of the alternative may be adopted
as per approved design

d&e) Overheads & Contractors Profit 0.136


Cost for 205 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/205
Note in MORTH : 1. Although the rollers are required only for 3 hours as per norms of out
the same have
2. Quantity to be available
of Bitumen has beenat site
takenforfor
sixanalysis
hours aspurpose.
the hot mix
Theplant and
actual paver will
quantity willtake si
depen
job
3. mix formula.
Labour for traffic control, watch and ward and other miscellaneous duties at site in
sundries
4. In case BM been
have is laidincluded in administrative
over freshly overheads
laid tack coat, provisionof
ofthe contractor.
Mechanical broom and 2 mazd
the same shall be deleted as the same has been included in the cost of tack coat.
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant pro
an average output of 75 tonnes per hour using crushed aggregates of specified grading, pr
with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to wo
laying with a hydrostatic paver finisher with sensor control to the required grade, lev
alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the
compaction as per MORTH specification clause No. 509 complete

Unit = cum
Taking output = 191 cum (450 tonnes)(VG-
30)
a) Labour
Mate day -
Mazdoor (Unskilled) working with HMP, day 16.000
mechanical broom, paver, roller, asphalt
cutter and assistance for setting out lines,
levels and layout of construction
Skilled mazdoor for checking line & levels day 5.840
b) Machinery
Batch mix HMP @ 75 tonne per hour hour 6.000
Paver finisher hydrostatic with sensor control hour 6.000
@ 75 cum per hour
Generator 250 KVA hour 6.000
Front end loader 1 cum bucket capacity hour 6.000
Tipper 10 tonne capacity t.km 4500.000
Add 10 per cent of cost of carriage to cover
cost of loading and unloading
Smooth wheeled roller 8-10 tonnes for initial hour 3.900
break down rolling.
Vibratory roller 8 tonnes for intermediate hour 3.900
rolling.
Finish rolling with 6-8 tonnes smooth wheeled hour 3.900
tandem roller.
c) Material
i) Bitumen@ 5 per cent of weight of mix t 22.500

ii) Aggregate
Total weight of mix = 450 tonnes
Weight of bitumen = 22.5 tonnes
Weight of aggregate = 450 -22.50 = 427.50
tonnes
Taking density of aggregate = 1.5 ton/cum

Volume of aggregate = 285 cum


Grading - II-13 mm (Nominal Size)
13.2 - 10 mm 30 per cent cum 85.500
10 - 5 mm 25 per cent cum 71.250
5 mm and below43 per cent cum 122.550
Filler @ 2 per cent of weight of aggregates. t 8.620
(Cement) 12 mm thick
Any one of the alternative may be adopted
as per approved design
(ii) For Grading-II(13 mm nominal size)
d&e) Overheads & Contractors Profit 13.615%
Cost for 191 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/191
Note : 1. Although the rollers are required only for 3 hours as per norms of output, but th
have to beofavailable
2.Quantity Bitumenathas sitebeen
for six hours
taken as the hot
for analysis mix plant
purpose. Theand paver
actual will take
quantity six ho
will depen
job Labour
3. mix formula.
for traffic control, watch and ward and other miscellaneous duties at site in
sundries
4. In case BC been
have is laidincluded in administrative
over freshly overheads
laid tack coat, of the
provision contractor. broom and 2 ma
of mechanical
shall
5. Thebeindividual
deleted as the same
density has been
for each size included in the to
of aggregates cost
beofused
tack for
coat.
construction i.e. 37.5-2
25-10
6. Themm etc. should
individual be foundof
percentage in aggregates
the laboratory and accordingly
should the quantities
be calculated from the should be am
total weight
aggregates i.e.. excluding the weight of bitumen. The weight of filler will also be 2 per c
BLD-CSTN-2-8 (16) : Filling with gravel in trenches, sides of foundations and baseme
initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by water
ramming including cost and conveyance of water to work site and all operational, incidental
charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 31

out put 6.00


a) Material
gravel (C-Mat-S.No6) 6.00 Cum
b) Labour
Mate (Labour -R&B-Second Class S.No-71) 0.00 day
Mazdoor (Labour-Irrigation-Unskilled S.No1) 0.31 day
Sub Total
b&c) Overheads & Contractors Profit 13.615%
Cost for 6 cum = a+b+c
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per cum = (a+b+c)/6
Rate per 1 Cum

Manufacture, Supply and Delivery of Unplasticised PVCs Pipes for potable water su
conforming to IS : 4985/2000 (3rd revision) with bell ends (Socket) as per specification i
10 Grey/Natural Ivory Grey/ Any other Color (except White) inclusive of transportation to th
divisional stores anywhere in TG excluding Taxes.

110 mm dia 6Kgs/cm2


1 Rmt
Contractors Profit 13.62%
Rate Amount
of 0.9 cum bucket capacity including
opes, in accordance with requirements of
embankment location with all lifts and
2.3 MORD / 301 MORTH

510.00 1060.80

2967.90 10684.44

1004.40 15066.00
26811.24
3650.35
30461.59
84.62

he subgrade level, watered, graded and


and 300.2 for subgrade construction as
MORTH.

510.00 1591.20

568.23 5114.07
3601.92 21611.52
698.88 2795.52

21591.75
2878.90

98.00 2352.00
55056.06
7495.88

62551.94
104.25

57.10
123.00
180.10

graded material grade-III , spreading in


ng by mix in place method with rotavator
e the desired density, complete as per

540 1296
510 4080

3601.92 21611.52

2878.9 17273.40
472.64 5671.68
698.88 2096.64

0.00 0.00
0.00 0.00

859.33 115493.95
774.95 37197.60
774.95 156229.92
98 1764.00
362714.71
49383.61
412098.32
1373.66

one aggregate to wet mix macadam


at OMC in mechanical mixer (Pug Mill),
orm layers in sub-base/base course on a
wheel roller of 80 to 100kN / Vibratory
sity including lighting, barricading and
0.12 and Technical Specification Clause
540 1339.20
510 5100.00

1843.52 16591.68
1478.40 8870.4
1843.52 11061.12
2518.88 15113.28
2878.90 11227.71

0 0
698.88 2096.64
6 29700

1056.61 94143.95
945.40 112313.52
774.95 69048.05
98.00 1764.00
378369.55
51515.01

429884.56
1910.60

n (SS2) on prepared surface of granular


rimer at the rate of 0.60 kg/sqm using
TH.

510.00 1060.80

399.84 1119.55
1358.70 3804.36
1677.76 3355.52

698.88 698.88

31757.50 66690.75
98.00 588.00
77317.86
10526.83
87844.69
25.10
sqm as per clause 502.8. Payment shall
on between this quantity and the actual
RS-1)using emulsion pressure distributor
uminous/granular surface cleaned with
TH

510.00 1060.80

399.84 1119.55
1358.70 3804.36
963.20 1926.40

30097.50 21068.25
28979.36
3945.54
32924.90
9.41

120 TPH / 40-60 TPH hot mix plant


ur using crushed aggregates of specified
o site, laid over a previously prepared
nd alignment and rolled as per clauses
Tech. specification No. 504 MORTH.

510.00 7140.00

540.00 3153.60

0.00 0.00

21414.40 256972.80
1358.70 2989.14
2518.88 15113.28
2072.00 12432.00
1843.52 11061.12
1342.30 5234.97

2878.90 11227.71

1843.52 7189.73

38437.50 570796.88

1156.20 33541.36
1194.95 34665.50
1043.70 30277.74
943.70 27376.74

0.00
943.70 54753.47

774.95 44962.60
0.00
774.95 22481.30
774.95 22481.30
1173851.23

159819.85
1333671.08
6505.71
y for 3 hours as per norms of output, but
ot mix
se. Theplant and
actual paver will
quantity will take six hours
depend upon
r miscellaneous duties at site including
f the
of contractor.
Mechanical broom and 2 mazdoors for
in the cost of tack coat.
TPH batch type hot mix plant producing
ggregates of specified grading, premixed
ller, transporting the hot mix to work site,
ontrol to the required grade, level and
tandem rollers to achieve the desired
omplete

510.00 8160.00

540.00 3153.60
0.00
24268.16 145608.96
3426.65 20559.90

2072.00 12432.00
1843.52 11061.12
6.00 27000.00

1342.30 5234.97

2878.90 11227.71

1843.52 7189.73

38437.50 864843.75

993.70 84961.35
859.33 61227.26
774.95 94970.12
4600.00 39652.00
1397282.47

190240.01
1587522.48
8311.64
rs as per norms of output, but the same
se.plant
Theand paver
actual will take
quantity six hours
will depend for
upon
miscellaneous duties at site including
n the
f contractor. broom and 2 mazdoors
of mechanical
eofused
tack for
coat.
construction i.e. 37.5-25 mm,
dingly the quantities
calculated from the should be amended
total weight of dry
eight of filler will also be 2 per cent by
sides of foundations and basement with
ng each deposited layer by watering and
site and all operational, incidental, labour
em of work. (APSS NO. 309 & 310)

Cum

148.26 889.56

540.00 0.00
510.00 158.10
1047.66
142.638909
1190.30

198.38
198.38

Pipes for potable water supplies


(Socket) as per specification in light
clusive of transportation to the sub-

234 234
31.8591
265.86
375 of 2191 3. Cental Light

KODADA MUNICIPALITY
Construction of Divider and central lighting
Estimate for providing Central lighting in the Median
S.No Description of Work Nos L Qty Rate Per Amount

1 ELEC-7.2.3 : Fabrication, Transportation and supply of hot-dip


galvanized Octogonal Pole with BSEN -10025 grade S 355 JO
steel plate for shaft, IS 2062 for base plate with door opening
arrangement, including the supply of suitable boards with
bakelite sheet and MCB's as per IS specification suitable to
withstand the wind speed of 180 KMPH for 12 mtrs height Pole
having dimensions Bottom 155mm, Top 70mm with 3mm
thick, base plate 260 x260 x16mm and 4 Nos of M24 x 750 long
'J' bolts along with template ofMakes: Bajaj / Valmont /
TRANSRAIL

1 x 250 250 Nos 30536.30 1 Nos 7634075.00


2 ELEC-7.3.3 : Fabrication, Transportation and supply of
1.5mtrs sword type decorative double arm bracket with
dooms either sides complete with all accessories with MS
galvanized 50mm dia Pipe.
1 x 250 250 Nos 5748.92 1 Nos 1437230.00
3 ELEC-7.9.3 : Foundation and erection charges with special T&P,
for 12.00Mtrs / 10Mtrs long Octagonal / Conical pole duly
erecting on base plate duly providing 4 Nos foundation bolts
with nuts with providing of 0.60Mtr x 0.60Mtrs x 1.40 Mtr size
M20 cc work vibrated concreting mixing with necessary steel
(15kgs) reinforcement as directed by the field engineers during
execution including all labour charges and cost and conveyance
of materials etc. complete
1 x 250 250 Nos 8947.18 1 Nos 2236795.00
376 of 2191 3. Cental Light

S.No Description of Work Nos L Qty Rate Per Amount


4 ELEC-4.1.10 : Supply of 10 Sqmm 4 Core XLPE insulated,
1100V grade armoured alluminium cable as per specification
confirming to IS:7098 (Part - I) of Makes : RPG / Finolex /
Paragon / V-Guard / Fortune Art / Suncab / Finecab / Gemscab /
Payal.

4 Core 10 Sqmm 1 x 1 7500 7500 Rmt 159.06 1 Rmt 1192950.00


5 ELEC-4.1.12 : Supply of 16 Sqmm 4 Core XLPE insulated,
1100V grade armoured alluminium cable as per specification
confirming to IS:7098 (Part - I) ofMakes : RPG / Finolex /
Paragon / V-Guard / Fortune Art / Suncab / Finecab / Gemscab /
Payal.
4 Core 16 Sqmm 1 x 1 625 625 Rmt 174.97 1 Rmt 109356.25
6 ELEC-4.8.2 : Supply and Transportation of Outer dia 63mm and
Inner dia 51mm double walled corrugated HDPE duct made as
per specification BSEN - 500 86/IS 14930 Part-II. Makes:DURA
LINE (Dura Guard) or its equivalent make.
51mm dia DWC pipe 1 x 1 7500 7500 Rmt 132.93 1 Rmt 996975.00
7 Supply and erection of the feeder pillar box of MS sheet of 14
SWG 110 X 700 X 250 mm in size and painted with 2 coats of
red oxide and two coats of synthetic enamel paint of light gray
shade (or power coated). The FPB should be out door type, dust
and vermin proof, confirming to IP – 55 degree of protection as
per IS – 2147. The inner door of the box should be having an
interlocking arrangement. Single compression cable glands and
crimping type lugs shall be carried out with copper standard
conductor, flexible PVC insulated 1100 V grade wire. The FPB
should consists the following.
377 of 2191 3. Cental Light

S.No Description of Work Nos L Qty Rate Per Amount


a) Out door with concealed hinges and neoprene sponge gasket.
b) Hinged inner door.
c) MS bracket for pad locking facility with Canopy.
d) 3 Nos siemen’s type door lock with key on outer door.
e) Dancer notice plate.
f) MS base channel 50 x 50 x 3 mm thick and 2 Nos thumb
screws.
g)1 No Micro processed based electronic timer. LS
h) 3 Nos 63 A HRC fuses EE or equivalent make.
k) 4 Nos 60 A TPN MCB’s as out going MDS / Havell’s
l) 4 Nos 25 x 6mm thick alluminium bus bars for R.Y.B phases
and neutral mounted rigidly on suitable insulators.
m)1 No 110 A Contactor (ML – 6) L&T make.
n) 1 No kaycee make auto / mannual switch.
o) Removable undrilled MS painted cable gland plate.
p) MS base plate for mounting switch gear components.
q) 4 Nos foundation holes in base channel to suit M 12
foundation bolts.
r) 4 Nos 4 way terminal blocks for outgoing cricuits open barrier
type balson / Everest / Essen or equivalent make (1 No. 100 A
four way terminal block for incoming open barriers type or
balson / everest / essen or equivalent make.
s) 2 Nos earthing studs (M10) with nut and spring washer etc,.

1 x 13 13 job 20063.27 1 job 260822.51


8 ELEC-1.6.4 :Supply of 3 Core x 2.5 Sqmm FRLS armoured
copper cable as per IS. 7098 / Part-I / 1988 including all taxes
etc., complete of make Universal/ CCI /Unicab/Polycab /
Finolex / KEI / Havells.
3 Core x 2.5 Sqmm FRLS armoured copper cabl 1 x 1 5625 5625 Rmt 97.29 1 Rmt 547256.25
378 of 2191 3. Cental Light

S.No Description of Work Nos L Qty Rate Per Amount


9 ELEC-4.4.1 : Supply and fixing of crimping type copper lugs
confirming to I.S specifications for cable upto 16 Sq.mm
including nuts and bolts with connections
Copper lugs 1 x 2000 2000 Nos 22.72 1 Nos 45440.00
10 ELEC-4.3.5 : Supply and Fixing of double compression brass
cable glands for 4 core XLPE armoured cable up to 16.0 Sq.mm
with brass washers complete.

Brass cable glands 1 x 26 26 Nos 11.36 1 Nos 295.36


11 ELEC-9.1.56 : Supply and laying of 40mm Nominal Bore medium
grade G.I.Pipe including cost and conveyance etc, complete.

40mm Nominal Bore medium grade G.I.Pipe 1 x 1 500 500 Rmt 477.18 1 Rmt 238590.00
12 ELEC-3.5.1: Supply & Installtion of Automatic Street Light
Control System with Optical Sensor, Low volatage / High voltage
trip and reset, operating voltage 150 - 280V AC, 50 HZ with
suitable SMC enclousure of IP 54 protection, MCBs and contactor
suitable to control the load of 3 KW of single phase load with
necessary clamping arrangements. Makes : Swadeep Nature
Switch / Light Mate.
1 x 5 5 No 31812.20 1 No 159061.00
379 of 2191 3. Cental Light

S.No Description of Work Nos L Qty Rate Per Amount


13 Supply and installation of advanced lighting protection with 205
-580mm height and 4.60 - 4.940 kgs, and having Rod length
760mm,weight 1.795 kgs with stainless steel rod, working on
the principle of (ESE) Early Streamer Emission technology,
having a coverage radius of 79 Mts under level 1 protection and
107 Mtrs radius under level 4 protection when mounted on 5 -
15 mts height of existing lattice tower giving level 1 protection
and anticipation emission time of 60 - 72 micro seconds. The
ESE should be manufactured according to standard NFC 17-
102 : 2011 and CE certified including functional integrity etc
Complete. Make : EARTHPLUS (THUNDER GUARD) / NIMBUS /
KALRE / FOREND.

1 x 13 13 Nos 129268.87 1 Nos 1680495.31


14 Supply and transportation of 180 W LED Street light Body made
of high grade pressure die – cast Aluminium alloy with corrosion
resistant powder coat, having protective toughened glass cover,
Less Glare, IP 66 (Silicon gasket ensures Optical & Electrical
compartments are IP 66) protected, wide operating voltage
range, P.F > 0.90, System having efficacy >100 lumens/watt,
with Ingress protection IP66, Driver surge protection more than
4KV, THD<15%, CCT: 3000- 6500K as desired by the
department and as per IS, CRI>80, Inbuilt Electrical protections
like Over voltage, short circuit, Over load, Open Circuit,
Miswiring, etc complete with 5 years warranty .LUMINAIRE
MAKE : PHILIPS / OSRAM / GE / CROMPTON / BAJAJ /
SCHREDER / VIN / HALONIX /HAVELLS / HPL / SURYA / SYSKA.
LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM /
SAMSUNG / LG LEDs.

180W Street light lamps 2 x 250 500 Nos 19574.73 1 Nos 9787365.00
380 of 2191 3. Cental Light

S.No Description of Work Nos L Qty Rate Per Amount


15 Laying of PVC armoured under ground cable in existing duct as
directed by the department including cost and conveyance of all
materials and labour charges etc., complete.

Armoured cable 1 x 1 8250 8250 Rmt 15.00 1 Rmt 123750.00


16 Laying of 63mm and Inner dia 51 mm double walled
corrugated HDPE as directed by the department including cost
and conveyance of all materials and labour charges etc.,
complete.
Laying DWC pipe in Median 1 x 1 7500 7500 Rmt 47.00 1 Rmt 352500.00
17 Supply of 6-32 V, 10KA, SP MCB C/D Curve ISI Mark.Makes : 500 Nos 26.28 1 Nos 13140.00
Legrand-DX3 / Schneider-Acti9 / Siemens / L&T Exora /
1 x 500
Cabtree.

18 Supply of 63A 4 Way Connector 1 x 500 500 Nos 219.28 1 Nos 109640.00
19 Supply and Run of No.8 SWG G.1 wire including cost of all
accessories
and labour charges etc., complete.
1 x 2250 2250 Rmt 50.00 1 Rmt 112500.00
20 Fabrication supply and errection of water tight M.S junction Box
260 x 300 x 140 mm (depth) size and 16 guage MS sheet with
fixing arrangements, with necessary holes for cable entry and
exit from the box. The box shall be provided with cover and
hinges on one side and bolting at other end. The box shall be
fixed by clamps fabricated from 25mm x 3mm MS flat. The box
consisting of 2 Nos of MCB and 1 No of 60 AMPS ‘L’ way
consider doubl arm and box shall be painted with one coat of
Red Oxide and two coats aluminium paint including
transportation etc., complete for finished item of work.

1 x 17 17 Nos 3678.66 1 No 62537.28

Input
381 of 2191 3. Cental Light

S.No Description of Work Nos L Qty Rate Per Amount


No of poles ( 150mm Bottom & 70 mm top Dia ) 50 nos
dia of pole (Avg dia.= (150+70)/2=110 mm) 0.11 mtrs
Height of pole 12 mtrs
Painting area of each pole (pi x d x h) 4.14 sqm
No of Arm Brackets (1.5 mtrs length & 50mm dia) 100 nos
Painting area of each bracket (pi x d x h) 0.24 sqm
Total Area of painting of poles 207 sqm
Total Area of painting of brackets 24 sqm

21 Painting with Aluminium paint Two Coats - Old Iron Work : in all
to give an even shade after thourughly brushing the surface to
remove all dirt and remains of loose powdered materials,
including cost and conveyance of all materials to work site and
all operational, incidental, labour charges etc. complete for
finished item of work

1 x 1 231 sqm 142.66 1 sqm 32954.46

Total Amount Rs. 27133728.42


Say 271.34 Lakhs
KODADA MUNICIPALITY
Name of the Work:: Providing Double Arm Central Lighting with 12.0 mts hot-dip galvanized
Octogonal
Sl.No PoleDescription
SSR No with 180 WofLED
Item luminaries
at various places in Kodad
Qty Municipality
Rate per Amount
No of Poles 1 nos
1.50 mtrs sword type decorative Single arm 1 mtrs
bracket cable 16 sqmm 4 core
P V C insulated cable 4.0 Sqmm (56/0.3) 3 Core 1 mtrs

Armoured alluminium cable length 1 mtrs

Fabrication, Transportation and supply of hot-dip


galvanized Octogonal Pole with BSEN - 10025
grade S 355 JO steel plate for shaft, IS 2062 for
base plate with door opening arrangement,
including the supply of suitable boards with
bakelite sheet and MCB's as per IS specification
suitable to withstand the wind speed of 180
ELEC-7.2.1 KMPH for 9 Mtrs height Pole having dimensions
1
(b) Bottom 155mm, Top 70mm with 3mm thick,
base plate 260 x 260 x 16mm and 4 Nos of M24
x 750mm long 'J' bolts along with template.
Makes: BAJAJ / VALMONT / TRANSRAIL /
SKIPPER / UTKARSH / LAASMA

1 16876.00 each 16,876.00


Add over heads & contractor profit @ 0.14 2,297.67
Total Rs 19,173.67
Fabrication, Transportation and supply of MS
ELEC- galvanized 50mm dia Pipe 1.5 Mtr sword type or
2
7.3.2(d) any decorative double arm bracket with dooms
etc complete with all accessories
1 5060.00 each 5,060.00
Add over heads & contractor profit @ 0.14 688.92
Total Rs 5,748.92
Foundation and erection charges with special
T&P, for 9.00Mtrs / 10Mtrs long Octagonal /
Conical pole duly erecting on base plate duly
providing 4 Nos foundation bolts with nuts with
providing of 0.60Mtrx0.60Mtrsx1.40 Mtr size
M20 cc work vibrated concreting mixing with
necessary steel (15kgs) reinforcement as
ELEC- directed by the field engineers during execution
3
7.10.3 including all labour charges and cost and
conveyance of materials etc. complete. as
directed by the field engineers during execution
including all labour charges and cost and
conveyance of materials etc. complete.

1 6300.00 each 6,300.00


Add over heads & contractor profit @ 0.14 857.75
Total Rs 7,157.75
Supply and transportation of 150Watts LED
Street light Body made of high grade pressure
die – cast Aluminium alloy with corrosion
resistant powder coat, having protective
toughened glass cover, Less Glare, IP 66
(Silicon gasket sures Optical & Electrical
compartments are IP 66) protected, wide
operating voltage range, P.F > 0.90, System
having efficacy >100 lumens/watt, with Ingress
protection IP66, Driver surge protection more
than 4KV, THD<15%, CCT: 3000- 6500K as
ELEC- desired by the department and as per IS,
4
3.11.1(k) CRI>80, Inbuilt Electrical protections like Over
voltage, short circuit, Over load, Open Circuit,
Miswiring, etc complete with 5 years warranty.
LUMINAIRE MAKE : PHILIPS / OSRAM / GE /
CROMPTON / BAJAJ / SCHREDER / VIN /
HALONIX / HAVELLS / HPL / SURYA / SYSKA.
LED MAKE : PHILIPS LUMILEDS / CREE /
NICHIA / OSRAM / SAMSUNG / LG LEDs.

150 W 1 14982.00 each 14,982.00


Add over heads & contractor profit @ 0.14 2,039.80
Total Rs 17,021.80
120 W 1 12884.00 each 12,884.00
Add over heads & contractor profit @ 0.14 1,754.16
Total Rs 14,638.16
Supply and fixing of suitable out door feeder
piller box of size made with 14 SWG CRCA
sheet with double door arrangement, making
powder coating after processing of 7 Tank
process, lock and key,hinges, rubber gasket,
danger board,suitable angle iron stand for
mounting the feeder pillar with cement concrete,
including Supply and fixing of Legrand /
Schnieder make as out goings, indication lamps,
ELEC- din channel, 6 Sqmm 3 core copper cable for
5
7.5.2 b invidual light control, connectors, gland plates
and provision for 3 phase energy meter etc.,
complete for finished item of work and suitable
wiring provision for connecting the nature switch
with following.(63A, 4 Pole isolator as incomer, 6
Nos 6-32A SP MCBs)

63A, 4 Pole isolator as incomer, 6 Nos 6-32A SP 1 17738.00 each


17,738.00
MCBs
Add over heads & contractor profit @ 0.14 2,415.03
Total Rs 20,153.03
Providing independent earthling by excavating a
trench to a depth of 2.1 M in all soils, as per size
specified in the Data, using 40mm dia 'B' class
GI pipe of 2.5 Mtrs length with necessary
accessories with hume pipe ring duly providing
6 5.1.1
staggered holes including filling with equal
proportion of Salt and Charcoal in layers and all
labour charges etc., complete for small quarters.
a) Material
Earth Work Excavation of Hard gravel Soil with cum 0.85 185.64
small boulder for trench 1st step of size 1.5 x 157.79
0.6 x 0.9 m (5'x2'x3')
Excavation of Hard disintegrated rocks and cum 0.90 185.64
boulders for trench 2nd Step of size 1.2 x 0.6 x 167.08
1.2 m (Civil SSR) (4'x2'x4')
25% extra for narrow trench & pit and back
filling with Sand, Coke, Salt etc., and leveling
ELEC- 40mm dia 'B' Class G.I pipe Mtr 2.50 350
875.00
9.4.15
25 x 6 mm (1"X 1/4") G.I Flat duly drilled 12mm Each 1.00 50
ELEC-9.4.2 50.00
holes (4 Nos) of 200 mm (8") length
ELEC- Drilling of 16 Nos through holes of 12mm dia to Each 16.00 6
96.00
9.4.18 G.I pipe
ELEC- G.I Nuts, Bolts an Washers Set 4.00 12
48.00
9.4.19
ELEC- 18" dia hume pipe ring Each 1.00 250
250.00
9.4.20
ELEC- Hard Coke Kg 40.00 20
9.1.10
800.00
ELEC- Salt Kg 20.00 15
300.00
9.1.11
b) labour charges for fixing pipe ring and Each
connections
Semi skilled Electrician Nos 0.50 450 225.00
Helpers Nos 0.50 450 225.00
Sundries 0.2 450 90.00
3,283.87
Add contractor profit 14% 0.13615 447.10
Rate per each 3,730.97
Supply and Transportation incluiding Earth work
excavation and laying charges of Outer dia
63mm and Inner dia 51mm double walled
7 corrugated HDPE duct made as per
specification BSEN - 500 86/IS 14930 Part-II.
Makes:DURA LINE (Dura Guard) or its
equivalent make.51mm dia DWC pipe

a) Material
ELEC- 63mm and Inner dia 51mm double walled mts 1.00 117
117.00
4.8.1 (b) corrugated HDPE duct
Excavation of earth 100 x 0.3 X 0.9 m cum 0.23 185.64 41.77
Pipe laying cost mt 1.00 18 18.00
176.77
Add over heads & contractor profit @ 0.14 24.07
Total Rs 200.84
Supply and Transportation of Outer dia 50 mm
and Inner dia 38 mm double walled corrugated
HDPE duct made as per specification BSEN -
8 500 86/IS 14930 Part-II. Makes:DURA LINE
(Dura Guard) or its equivalent make.51mm dia
DWC pipe

a) Material
ELEC- 50mm and Inner dia 38mm double walled mts 1.00 91
91.00
4.8.1 (a) corrugated HDPE duct
91.00
Add over heads & contractor profit @ 0.14 12.39
Total Rs 103.39
Supply and fixing of Automatic Street Light
Control System with Optical Sensor, Low
volatage / High voltage trip and reset, operating
voltage 380 - 450 V AC, 50 HZ with suitable
SMC enclousure of IP 54 protection, MCBs of
ELEC- Legrand / Schneider / L&T / Siemens of 10KA
9
3.5.2(d) C/D curve and Contactor suitable to control the
load of 12KW three phase load with necessary
clamping arrangements. Makes : Swadeep
Nature Switch / Light Mate / L&T / Siemens /
Bajaj.

12 KW 1 17600.00 no 17,600.00

Add over heads & contractor profit @ 0.14 2,396.24


Total Rs. 19,996.24
Supplying and erecting of 50Sq.mm 3 ½ core
PVC armoured U.G cable 1100V grade with ISI
mark following strand/solid aluminium conductor
by making trench in soil up to 0.9m deep
embedding the cable complete with sand bed of
20cm, thick layers and bricks placed on top of
the cable width wise all over the run and
backfilling the excavated earth without stones
and hard materials and making the surface
proper, 8 SWG GI wire including glands, lugs,
10 15.6.1 including crimping job, to be laid partly in trench,
partly in ground with cable indicators at 8 Meter
interval etc, complete as directed by site In-
Charge for service connections etc., complete.
(Asian / Universal / Paragon/ Finolex / Polycab /
Powerflex) from feeder pillars to Meter box.and
as per the directions of the Engineer.

a) Material
Excavation of earth 100 x 0.3 X 0.9 m cum 27.00 185.64 5,012.28
TBSC-A.I- Cost of bricks (Civil SSR) 23 x 11 x 7 1000 0.92
01 Nos
NOS 519.00 5.7 2,958.30
Cost of sand (Civil SSR) cum 6.00 570 3,420.00
Cement (Civil SSR) Kg 25.00 4.75 118.75
ELEC- Cable root Indicators of size 152mm round / each 12.00 88
1,056.00
9.1.25 102mm x 102mm /
50Sq.mm 3 ½ core PVC armoured U.G cable mts 100.00 266
ELEC-4.1.2 1100V grade with ISI mark following strand/solid
(801)i)
26,600.00
aluminium conductor
Transportation charges of bricks and sand LS 1.00 10 10.00
b) Labour charges for laying cable.
Man Mazdoor for spreading the sand and back each 2.50 425
1,062.50
filling the excavated soil.
Skilled Electrician day 1.00 540 540.00
Helper day 2.00 450 900.00
dayindicators
Man Mazdoor for concreting and embedding of cable way 2.00 425
850.00
Sundires and Rounding off
Add labour allowance 0.2 3352.5 670.50
43,198.33
Add contractor profit 14% 0.13615 5,881.45
Rate per each 49,079.78
Rate per 100mts 490.80
Supply and laying of 16 Sqmm 4 Core XLPE
insulated, 1100V grade armoured alluminium
ELEC- cable as per specification confirming to IS:7098
11
4.1.1 (F) (Part - I). Makes : Torrent / Universal / Unicab /
Polycab / Havells / Gloster / KEI or equivalent

1 154.00 rmt 154.00


unskilled labour 0.08 450.00 rmt 36.00
190.00
Add over heads & contractor profit @ 0.14 25.87
Total Rs 215.87
Supply and laying of 4.0 Sqmm (56/0.3) 2 Core
PVC Insulated, Flexible Armouring Flexible
Copper cable as per IS 7098 / Part-I / 1988
ELEC- including all transportation charges etc
12
1.5.6(b) complete. Makes : Finolex / RR kabel / avells /
Polycab / RPG / KEI / Nakoda / Gemni / HPL /
Gloster

4.0 Sqmm (56/0.3) 2 Core 1 122.00 rmt 122.00


122.00
Add over heads & contractor profit @ 0.14 16.61
Total Rs. 138.61
ELEC- Supply and fixing of 6-32A 10KA SP MCB, C/D
13 2.13.1 Curve ISI Mark. Makes : Legrand-DX3 /
(458(a)) Schneider-Acti9 / Siemens / L&T,Exora.
6-32A SP MCB 1 193.00 no 193.00
Add over heads & contractor profit @ 0.14 26.28
Total Rs. 219.28
Supply and fixing of single compression brass
ELEC- cable glands for 3 1/2 core XLPE armoured
14 4.3.1 cable up to 50Sq.mm with brass washers
(827,c) complete
25 Sqmm to 50.0 Sq.mm 3.5 Core 1 123.00 no 123.00
Electrician ( Licensed ) including allowences 0.08 648.00 each 51.84
Electrician unskilled including allowences 0.08 540.00 each 43.20
218.04
Add over heads & contractor profit @ 0.14 29.69
Total Rs. 247.73
Supply and fixing of heavy duty long barrel
copper lugs confirming to I.S specifications
15 ELEC- 4.4.1 suitable for 16 sqmm cable etc complete with
nuts, bolts and washers. Makes: DMI / Jainson /
Dowels
16 sqmm 1 47.00 no 47.00
47.00
Add over heads & contractor profit @ 0.14 6.40
Total Rs. 53.40
ELEC- Supply of single compression brass cable
16 4.3.1 glands for 4 core XLPE armoured cable up to
(827,b) 16.0 Sq.mm with brass washers complete
1 84.00 no 84.00
Electrician ( Licensed ) including allowences 0.08 648.00 each 51.84
Electrician unskilled including allowences 0.08 540.00 each 43.20
179.04
Add over heads & contractor profit @ 0.14 24.38
Total Rs. 203.42
Supply of heavy duty long barrel copper lugs
confirming to I.S specifications suitable for 16
17 ELEC- 4.4.1 sqmm cable etc complete with nuts, bolts and
washers. Makes: DMI / Jainson / Dowels
up to 16 sqmm 1 20.00 no 20.00
20.00
Add over heads & contractor profit @ 0.14 2.72
Total Rs. 22.72
Page 389 of 2191 data-Bld-18-19
KODADA MUNICIPALITY
DATA BASED ON - 2018 - 2019 SSR
43344
EARTH WORK EXCAVATION
I COMMON DATA
Sn. Description Quantity Rate Unit
1 Cutting open BT road surface (as well as asphalt concrete upto 75 mm thick ) including water bound macadam and
stacking of excavated materials for pipe line trench work. as directed by the departmental officers.
Rate as per PH SSR item no 25a, Pg.6 1 Cum 1042.00 1 Cum
Add for Municipal Allowance at 20% on 60% 0% 1042.00
Overheads & Contractors Profit 13.615%
Total
VAT & Labour cess. 0%
Rate per 1 Cum Rs

2 Cutting open C.C. road surface including stacking of excavated materials for pipe line trench work. as directed by the
departmental officers.
Rate as per PH SSR item no 25b,Pg.6 1 Cum 2169.00 1 Cum
Add for Municipal Allowance at 20% on 60% 0% 2169.00
Overheads & Contractors Profit 13.615%
Total
VAT & Labour cess. 0%
Rate per 1 Cum Rs

3 Cutting open water bound macadam road including soiling and stacking of excavated materials for pipe line trench
work. as directed by the departmental officers.
Rate as per PH SSR item no 25 c,Pg.6 1 Cum 267.00 1 Cum
Add for Municipal Allowance at 20% on 60% 0% 267.00
Overheads & Contractors Profit 13.615%
Total
VAT & Labour cess. 0%
Rate per 1 Cum Rs

4 BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and
depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such
as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308).
Ordinary Soil-Manual Means-Upto 3 m out put 10.00 Cum
depth
a)  Labour
Mate (Labour -R&B-Second Class S.No-71) 0 day 540.00 1 day
Mazdoor (Labour -Irrigation-Unskilled-S.No.3) 3.64 day. 510.00 1 day.
exclud-MA
Add Labour component @ 0%
Sub total
extra for foundations @ 0%
Sub - Total
c&d) Overheads & Contractors Profit 13.615%
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/10
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 1 Cum excluding Dewatering Rs
Page 390 of 2191 data-Bld-18-19
5 BLD-CSTN-2-8 (16) : Filling with HBG chips 2.36mm and below in trenches, sides of foundations and basement with
initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including
cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc.,
complete for finished item of work. (APSS NO. 309 & 310)
Sand Filling out put 6.00 Cum
a) Material
Stone crusher dust finer than 3mm (C-Mat-S.No1) 6.00 Cum 774.95 1 Cum
Sand Filling in Foundations

b)  Labour
Mate (Labour -R&B-Second Class S.No-71) 0.00 day 540.00 1 day
Mazdoor (Labour-Irrigation-Unskilled S.No1) 0.31 day 510.00 1 day
Sub Total
b&c) Overheads & Contractors Profit 13.615%
Cost for 6 cum = a+b+c
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per cum = (a+b+c)/6
Rate per 1 Cum

5 BLD-CSTN-2-8 (16) : Filling with gravel in trenches, sides of foundations and basement with initial lead in layers
not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete
for finished item of work. (APSS NO. 309 & 310)
Quarry rubish out put 6.00 Cum
a) Material
gravel (C-Mat-S.No6) 6.00 Cum 148.26 1 Cum
b)  Labour
Mate (Labour -R&B-Second Class S.No-71) 0.00 day 540.00 1 day
Stone dust filling

Mazdoor (Labour-Irrigation-Unskilled S.No1) 0.31 day 510.00 1 day


Sub Total
b&c) Overheads & Contractors Profit 13.615%
Cost for 6 cum = a+b+c
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per cum = (a+b+c)/6
Rate per 1 Cum

6 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix
(1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage
charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top
surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

Unit : 1cum
A. MATERIALS:
Cement-(C.Memo.No.146/Cement&Steel 162.00 Kg 4.60 1 Kg
Coarse aggregate 20mm metal ( C-Mat- S.No-58) 0.90 Cum 1256.20 1 Cum
Fine aggregate (Sand) ( C-Mat-S.N.2 ) 0.45 Cum 1303.00 1 Cum
Water (including for curing) -M-189-a. irrigation 1.20 Kl 98.00 1 Kl
SSR
B.MACHINARY
Page 391 of 2191 data-Bld-18-19
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity 1 hour 397.50 1 hour
(Hire Charges-Irrigation S.No16)

C. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11) 0.10 day 564.00 1 day
Mazdoor (Labour-Irrigation-Unskilled S.No1) 1.39 day 510.00 1 day
Sub - Total Rs
c.Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Add Labour Cess @ 0%
Grand Total
Rate per One Cum Rs

7 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete M20 grade nominal
mix(Cement : fine aggregate: coarse aggregate ) using Coarse aggregate 20mm size graded Metal including cost
and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all
materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the
required level curing etc., complete for finished item of work with nomonal reinforcement

Unit : 1cum
A. MATERIALS:
Cement-(C.Memo.No.146/Cement&Steel 330.00 Kg 4.60 1 Kg
Coarse aggregate 20mm graded (C-Mat-S.No:48) 0.90 Cum 1172.83 1 Cum
Fine aggregate (Sand) ( C-Mat-S.N.2 ) 0.45 Cum 1303.00 1 Cum
Water (including for curing) -M-189-a. irrigation 1.20 Kl 98.00 1 Kl
SSR
B.MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity 1 hour 397.50 1 hour
(Hire Charges-Irrigation S.No16)

B. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11) 0.10 day 564.00 1 day
Mazdoor (Labour-Irrigation-Unskilled S.No1) 1.39 day 510.00 1 day
Sub - Total Rs
c.Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Add Labour Cess @ 0%
Grand Total
Rate per One Cum Rs
Divider base slab
basic rate 1.00 cum 4440.29
Add centering charges @ 4%

Divider side wall slab


basic rate 1.00 cum 4440.29
Add centering charges @ 10%
Page 392 of 2191 data-Bld-18-19

8 BLD-CSTN-3-12-(29) Using Concrete mixture up to Plinth Level : Plain Cement concrete (M 15) Nominal Mix
1:2.5:5 (Cement : fine aggregate: coarse aggregate ) using 40, 20 & 10mm size Hard Granite Machine Crushed
Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site ,
seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers,
finishing top surface to the required level curing etc., complete for finished item of work.

Unit : 1cum
A. MATERIALS:
Cement-(C.Memo.No.146/Cement&Steel 275.00 Kg 4.60 1 Kg
Coarse aggregate 40mm metal ( C-Mat- S.No-58) 0.54 Cum 799.95 1 Cum
Coarse aggregate 20mm metal (C-Mat-S.No:56) 0.27 Cum 1256.20 1 Cum
Coarse aggregate 10mm metal (C-Mat-S.No:54) 0.09 Cum 989.95 1 Cum
Fine aggregate (Sand) ( C-Mat-S.N.2 ) 0.48 Cum 1303.00 1 Cum
Water (including for curing) -M-189-a. irrigation 1.20 Kl 98.00 1 Kl
SSR
B.MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity 1 hour 397.50 1 hour
(Hire Charges-Irrigation S.No16)
Add labour allowance on crew charges 1 hour 0.00 1 hour

B. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11) 0.10 day 564.00 1 day
Mazdoor (Labour-Irrigation-Unskilled S.No1) 1.39 day 510.00 1 day
Sub - Total Rs
c.Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Add Labour Cess @ 0%
Grand Total
Rate per One Cum Rs

1 BLD-CSTN-3-12-(29) Using Concrete mixture up to Plinth Level : Plain Cement concrete (M 15) Nominal Mix
1:2.5:5 (Cement : fine aggregate: coarse aggregate ) using 20mm graded metal of Hard Granite Machine Crushed
Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site ,
seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers,
finishing top surface to the required level curing etc., complete for finished item of work.

Unit : 1cum
A. MATERIALS:
Cement-(C.Memo.No.146/Cement&Steel 275.00 Kg 4.60 1 Kg
Coarse aggregate 20mm metal (C-Mat-S.No:56) 0.27 Cum 1172.83 1 Cum
B. LABOUR: 0.48 Cum 1303.00 1 Cum
Mason 1st class (labour-Irrigation.S.N.11) 1.20 Kl 98.00 1 Kl
B.MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity 1 hour 397.50 1 hour
(Hire Charges-Irrigation S.No16)
Add labour allowance on crew charges 1 hour 0.00 1 hour

B. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11) 0.10 day 564.00 1 day
Mazdoor (Labour-Irrigation-Unskilled S.No1) 1.39 day 510.00 1 day
Sub - Total Rs
c.Overheads & Contractors Profit 13.615%
Sub - Total
Page 393 of 2191 data-Bld-18-19
Add VAT @ 0%
Add Labour Cess @ 0%
Grand Total
Rate per One Cum Rs

NOMINAL MIX ( With Wooden Scaffolding)


11 BLD-CSTN-3-13- ( 30 ) - A- Nominal mix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate)
corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate)
from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all
operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work, but including centering and shuttering
charges for FOUNDATIONS, PLINTH, PEDESTALS

FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth)


M-20 Nominal mix
A.MATERIAL
Coarse aggregate 20mm graded (C-Mat-S.No:48) 0.90 Cum 1172.83 1 Cum
Sand - (C-Mat-S.No:2) 0.45 Cum 1303.00 1 Cum
Cement-(C.Memo.No.146/Cement&Steel 330.00 Kg 4.60 1 Kg
B.;LABOUR
1st Class Mason (Labour-Irrigation- skilled-S.No:11) 0.133 day. 564.00 1 day.

2nd Class Mason ( labour-Irri-Semi skilled-S.N.35) 0.267 day. 540.00 1 day.


Mazdoor (Both Men & Women) (Labour -Irrigation- 3.60 day. 510.00 1 day.
Unskilled-S.No.3)
C.MACHINERY

Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity 1.000 hour 397.50 1 hour
(Hire Charges-Irrigation S.No16)

Vibrator hire charges ( hire- irrigation-S.N.41) 1.000 hour 205.00 1 hour

Water (including for curing) -M-189-a. irrigation 1.20 Kl 98.00 1 Kl


SSR BASIC COST per 1 cum Rs

a Footings
M-20 Nominal mix 1.00 Cum 5935.18 1 Cum
Centering charges ,Pg No.108 to 111 of Bld.SSR 1.00 Cum 288.00 1 Cum

Labour charges Pg No.108 to 111 of Bld.SSR 1.00 Cum 631.00 1 Cum


Add Labour component on Labour charges @ 1.00 Cum 631.00 1 Cum
Sub - Total
Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per One Cum Rs

b Pedastals
M-20 Nominal mix 1.00 Cum 5935.18 1 Cum
Page 394 of 2191 data-Bld-18-19
Centering charges ,Pg No.108 to 111 of Bld.SSR 1.00 Cum 328.00 1 Cum
Labour charges Pg No.108 to 111 of Bld.SSR 1.00 Cum 1004.00 1 Cum
Add Labour component on Labour charges @ 1.00 Cum 1004.00 1 Cum
Sub - Total
Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per One Cum Rs

c Plinth beams
M-20 Nominal mix 1.00 Cum 5935.18 1 Cum
Centering charges ,Pg No.108 to 111 of Bld.SSR 1.00 Cum 1390.00 1 Cum
Labour charges Pg No.108 to 111 of Bld.SSR 1.00 Cum 1521.00 1 Cum
Add Labour component @ 1.00 Cum 1521.00 1 Cum
Sub - Total
Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per One Cum Rs

12 BLD-CSTN-3-13- ( 30 ) - B- Nominal mix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate)
corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate)
from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all
operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work, but including centering and shuttering
charges for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS - WOODEN SCAFFOLDING

COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS

A. MATERIALS:
Coarse aggregate 20mm graded (C-Mat-S.No:48) 0.90 cum 1172.83 1 cum
Sand - (C-Mat-S.No:2) 0.45 cum 1303.00 1 cum
Cement-(C.Memo.No.146/Cement&Steel 400.00 Kgs 4.60 1 Kgs

Sub Total of - A
B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11) 0.167 day 564.00 1 day
2nd Class Mason ( labour-Irri-Semi skilled-S.N.35) 0.167 day 540.00 1 day
Mazdoor (Both Men & Women) (Labour -Irrigation- 4.700 day 510.00 1 day
Unskilled-S.No.3)
Sub Total of - B
C. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity 1.00 hour 397.50 1 hour
(Hire Charges-Irrigation S.No16)
Add labour allowance on crew charges 1 hour 0.00 1 hour

Vibrator hire charges ( hire- irrigation-S.N.41) 1.00 hour 205.00 1 hour


Add labour allowance on crew charges 1 hour 0.00 1 hour
Water (including for curing) -M-189-a. irrigation 1.20 kl 98.00 1 kl
SSR Sub Total of - C
Page 395 of 2191 data-Bld-18-19
BASIC COST per 1 cum
D. Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per One Cum Rs

a Columns up to 3.66 Mts unsupported height above GL


M-20 Nominal mix 1.00 Cum 6783.36 1 Cum
Centering charges ,Pg No.108 to 111 of Bld.SSR 1.00 Cum 238.00 1 Cum
Labour charges Pg No.108 to 111 of Bld.SSR 1.00 Cum 1757.00 1 Cum
Add Labour component @ 20%
Basic Cost Rs
Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per One Cum Rs

Rate for other Floors 1F 2F 3F


M-20 Nominal mix 6783.36 6783.36 6783.36
Material Hire Charges for centering & Scaffolding 238.00 238.00 238.00
Labour Charges for centering & Scaffolding 1757.00 1932.00 2108.00
Add extra over Labour component @ 20%
For Manual lifting of all RCC items up to 3 Floors
only: Lift Charges of Labour, increase @ 10% on
labour charges for each upper floor on Ground
Floor Rate
For Mechanical Lifting of all RCC items: Lift
Charges of Materials only, for lifting Concrete
above 6.1 M (2nd floor onwards) Winch/ Lift hire
charges shall be allowed for each additional floor
(3.66 M) over and above 2nd floor (7.32 M
Winch hire charges ( 1.333 x 543.60 )
Total 8778.36 8953.36 9129.36
Overheads & Contractors Profit @ 0.13165 1195.17 1219.00 1242.96
sub total 9973.53 10172.36 10372.32
Add VAT @ 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00
Rate per One Cum 9973.53 10172.36 10372.32

c Lintels up to 3.66 Mts unsupported height above GL


M-20 Nominal mix 1.00 Cum 6783.36 1 Cum
Centering charges ,Pg No.108 to 111 of Bld.SSR 1.00 Cum 790.00 1 Cum
Labour charges Pg No.108 to 111 of Bld.SSR 1.00 Cum 1251.00 1 Cum
Add Labour component @
Sub - Total Rs
Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per One Cum Rs
Page 396 of 2191 data-Bld-18-19
Rate for other Floors 1F 2F 3F
M-20 Nominal mix 6783.36 6783.36 6783.36
Material Hire Charges for centering & Scaffolding 790.00 790.00 790.00
Labour Charges for centering & Scaffolding 1251.00 1376.00 1500.00
Add extra over Labour component @ 20%
For Manual lifting of all RCC items up to 3 Floors
only: Lift Charges of Labour, increase @ 10% on
labour charges for each upper floor on Ground
Floor Rate
For Mechanical Lifting of all RCC items: Lift
Charges of Materials only, for lifting Concrete
above 6.1 M (2nd floor onwards) Winch/ Lift hire
charges shall be allowed for each additional floor
(3.66 M) over and above 2nd floor (7.32 M
Winch hire charges ( 1.333 x 543.60 )
Total 8824.36 8949.36 9073.36
Overheads & Contractors Profit @ 0.14 1201.44 1218.46 1235.34
sub total 10025.80 10167.82 10308.70
Add VAT @ 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00
Rate per One Cum 10025.80 10167.82 10308.70

13 BLD-CSTN-3-13- ( 30 ) - C - Nominal mix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate)
corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate)
from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all
operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work, but including centering and shuttering
charges for RCC SLABS, BEAMS -WOODEN SCAFFOLDING

RCC SLABS, BEAMS -WOODEN SCAFFOLDING


A. MATERIALS:
Coarse aggregate 20mm graded (C-Mat-S.No:48) 0.90 cum 1172.83 1 cum
Sand - (C-Mat-S.No:2) 0.45 cum 1303.00 1 cum
Cement-(C.Memo.No.146/Cement&Steel 400.00 Kgs 4.60 1 Kgs
Sub Total of - A
B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11) 0.067 day 564.00 1 day
2nd Class Mason ( labour-Irri-Semi skilled-S.N.35) 0.133 day 540.00 1 day
Mazdoor (Both Men & Women) (Labour -Irrigation- 2.500 day 510.00 1 day
Unskilled-S.No.3) Sub Total of - B
C. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity 0.267 hour 397.50 1 hour
(Hire Charges-Irrigation S.No16)
Vibrator hire charges ( hire- irrigation-S.N.41) 0.267 hour 205.00 1 hour
Water (including for curing) -M-189-a. irrigation 1.200 kl 98.00 1 kl
SSR Sub Total of - C
BASIC COST per 1 cum
Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per One Cum Rs
Page 397 of 2191 data-Bld-18-19

a RCC M 20 Slabs 100 mm Thick 0.10


R.C.C. M 20 nominal mix Per Cum 1.00 Cum 5144.97 1 Cum
Centering charges ,Pg No.108 to 111 of Bld.SSR 10.00 Sqm 158.00 1 Sqm
Labour charges Pg No.108 to 111 of Bld.SSR 10.00 Sqm 167.00 1 Sqm
Add Labour component @ 20%
Sub - Total Rs
Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per One Cum Rs

Rate for other Floors 1F 2F 3F


M-20 Nominal mix 5144.97 5144.97 5144.97
Material Hire Charges for centering & Scaffolding 1580.00 1580.00 1580.00
Labour Charges for centering & Scaffolding 1670.00 1840.00 2010.00
Add extra over Labour component @ 20%
For Manual lifting of all RCC items up to 3 Floors
only: Lift Charges of Labour, increase @ 10% on
labour charges for each upper floor on Ground
Floor Rate
For Mechanical Lifting of all RCC items: Lift
Charges of Materials only, for lifting Concrete
above 6.1 M (2nd floor onwards) Winch/ Lift hire
charges shall be allowed for each additional floor
(3.66 M) over and above 2nd floor (7.32 M
Winch hire charges ( 0.27 x 562.90 )
Total 8394.97 8564.97 8734.97
Overheads & Contractors Profit @ 0.14 1142.98 1166.12 1189.27
Sub - Total 9537.95 9731.09 9924.24
Add VAT @ 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00
Rate per One Cum 9537.95 9731.09 9924.24

b RCC M 20 Slabs 125 mm Thick 0.125


R.C.C. M 20 nominal mix Per Cum 1.00 Cum 5144.97 1 Cum
Centering charges ,Pg No.108 to 111 of Bld.SSR 8.00 Sqm 158.00 1 Sqm
Labour charges Pg No.108 to 111 of Bld.SSR 8.00 Sqm 167.00 1 Sqm
Add Labour component @ 20%
Sub - Total Rs
Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per One Cum Rs

Rate for other Floors 1F 2F 3F


M-20 Nominal mix 5144.97 5144.97 5144.97
Material Hire Charges for centering & Scaffolding 1264.00 1264.00 1264.00
Labour Charges for centering & Scaffolding 1336.00 1472.00 1608.00
Page 398 of 2191 data-Bld-18-19
Add extra over Labour component @ 20%
For Manual lifting of all RCC items up to 3 Floors
only: Lift Charges of Labour, increase @ 10% on
labour charges for each upper floor on Ground
Floor Rate
For Mechanical Lifting of all RCC items: Lift
Charges of Materials only, for lifting Concrete
above 6.1 M (2nd floor onwards) Winch/ Lift hire
charges shall be allowed for each additional floor
Winch hire
(3.66 M) charges
over ( 0.272nd
and above x 562.90 )
floor (7.32 M
Total 7744.97 7880.97 8016.97
Overheads & Contractors Profit @ 0.14 1054.48 1072.99 1091.51
Sub - Total 8799.45 8953.96 9108.48
Add VAT @ 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00
Rate per One Cum 8799.45 8953.96 9108.48
c RCC M 20 Slabs 150 mm Thick 0.15
R.C.C. M 20 nominal mix Per Cum 1.00 Cum 5144.97 1 Cum
Centering charges ,Pg No.108 to 111 of Bld.SSR 6.67 Sqm 158.00 1 Sqm
Labour charges Pg No.108 to 111 of Bld.SSR 6.67 Sqm 167.00 1 Sqm
Add Labour component @ 20%
Sub - Total Rs
Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per One Cum Rs

Rate for other Floors 1F 2F 3F


M-20 Nominal mix 5144.97 5144.97 5144.97
Material Hire Charges for centering & Scaffolding 1053.86 1053.86 1053.86
Labour Charges for centering & Scaffolding 1113.89 1227.28 1340.67
Add extra over Labour component @ 20%
For Manual lifting of all RCC items up to 3 Floors
only: Lift Charges of Labour, increase @ 10% on
labour charges for each upper floor on Ground
Floor Rate
For Mechanical Lifting of all RCC items: Lift
Charges of Materials only, for lifting Concrete
above 6.1 M (2nd floor onwards) Winch/ Lift hire
charges
Winch hireshall be allowed
charges ( 0.27 xfor each) additional floor
562.90
(3.66 M) over and above 2nd floor (7.32 M
Total 7312.72 7426.11 7539.50
Overheads & Contractors Profit @ 0.14 995.63 1011.06 1026.50
sub total 8308.35 8437.17 8566.00
Add VAT @ 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00
Rate per One Cum 8308.35 8437.17 8566.00

RCC Beams - Nominal Mix ( Wooden centering )


d RCC Beams up to 3.66 Mts height
M-20 Nominal mix 1.00 Cum 5144.97 1 Cum
Centering charges ,Pg No.108 to 111 of Bld.SSR 1.00 Cum 1395.00 1 Cum
Labour charges Pg No.108 to 111 of Bld.SSR 1.00 Cum 1473.00 1 Cum
Add Labour component @ 20%
Page 399 of 2191 data-Bld-18-19
Sub - Total Rs
Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per One Cum Rs

Rate for other Floors 1F 2F 3F


M-20 Nominal mix 5144.97 5144.97 5144.97
Material Hire Charges for centering & Scaffolding 1395.00 1395.00 1395.00
Labour Charges for centering & Scaffolding 1473.00 1620.00 1768.00
Add extra over Labour component @ 20%
For Manual lifting of all RCC items up to 3 Floors
only: Lift Charges of Labour, increase @ 10% on
labour charges for each upper floor on Ground
Floor Rate
For Mechanical Lifting of all RCC items: Lift
Charges of Materials only, for lifting Concrete
above 6.1 M (2nd floor onwards) Winch/ Lift hire
charges shall be allowed for each additional floor
(3.66 M) over and above 2nd floor (7.32 M

Winch hire charges ( 0.27 x 562.90 )


Total 8012.97 8159.97 8307.97
Overheads & Contractors Profit @ 0.14 1090.97 1110.98 1131.13
Sub - Total 9103.94 9270.95 9439.10
Add VAT @ 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00
Rate per One Cum 9103.94 9270.95 9439.10

RCC M20 for Sun shades of 0.60M width, 75mm th. at fixed end and 50mm th. at free end - up to 3.66m above GL
e
M-20 Nominal mix 0.0625 Cum 5144.97 1 Cum
Centering charges ,Pg No.108 to 111 of Bld.SSR 1.00 Sqm 156.00 1 Sqm
Labour charges Pg No.108 to 111 of Bld.SSR 1.00 Sqm 192.00 1 Sqm
Add Labour component @ 20%
Rs
Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per One Sqm Rs

Rate for other Floors 1F 2F 3F


M-20 Nominal mix 321.56 321.56 321.56
Material Hire Charges for centering & Scaffolding 156.00 156.00 156.00
Labour Charges for centering & Scaffolding 192.00 211.00 231.00
Add extra over Labour component @ 20%
For Manual lifting of all RCC items up to 3 Floors
only: Lift Charges of Labour, increase @ 10% on
labour charges for each upper floor on Ground
Floor Rate
Page 400 of 2191 data-Bld-18-19
For Mechanical Lifting of all RCC items: Lift
Charges of Materials only, for lifting Concrete
above 6.1 M (2nd floor onwards) Winch/ Lift hire
charges shall be allowed for each additional floor
(3.66 M) over and above 2nd floor (7.32 M
Winch hire charges ( 0.27 x 562.90 )
Total 669.56 688.56 708.56
Overheads & Contractors Profit @ 0.14 91.16 93.75 96.47
sub total 760.72 782.31 805.03
Add VAT @ 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00
Rate per One Cum 760.72 782.31 805.03
Page 401 of 2191 data-Bld-18-19
DESIGN MIX ( Steel Scaffolding & Concrete Mixer )
13 BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using
WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved
quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as
weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but
excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with
minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS.
Note : 1) The cement content is adopted as 350Kg/cum for estimating purpose only.The exact quantities will be as
per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in
cost shall be deducted

A FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth)


RCC-M-25- Design Mix
A) Materials
20mm HBG graded metal (C-Mat-S.No:47) 0.80 Cum 1172.83 1 Cum
Sand - (C-Mat-S.No:2) 0.40 Cum 1303.00 1 Cum
Cement (ENC-PH.Memo.No.146/Cement & Steel / 380.00 Kg 4.60 1 Kg
T1
B) Labour
1st Class Mason (Labour-Irrigation- skilled-S.No:11) 0.133 day. 564.00 1 day.
2nd Class Mason ( labour-Irri-Semi skilled-S.N.35) 0.267 day. 540.00 1 day.
Mazdoor (Both Men & Women) (Labour -Irrigation- 4.60 day. 510.00 1 day.
Unskilled-S.No.3)
C) Machinary
Batching plant 0.5 cum ( 6 Cum/hr) 1.333 hour 608.10 1 hour

Vibrator hire charges ( hire- irrigation-S.N.41) 1.333 hour 205.00 1 hour

Water (including for curing) (Irrigation SSR- 1.20 Kl 98.00 1 Kl


S.No:M189) BASIC COST per 1 cum Rs

a Footings
RCC-M-25- Design Mix 1.00 Cum 6974.12 1 Cum
Centering charges ,Pg No.108 to 111 of Bld.SSR 1.00 Cum 288.00 1 Cum
Labour charges Pg No.108 to 111 of Bld.SSR 1.00 Cum 631.00 1 Cum
Add Labour component on Labour charges @ 1.00 Cum 631.00 1 Cum
Sub - Total
Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per One Cum Rs

b Pedastals
RCC-M-25- Design Mix 1.00 Cum 6974.12 1 Cum
Centering charges ,Pg No.108 to 111 of Bld.SSR 1.00 Cum 328.00 1 Cum
Labour charges Pg No.108 to 111 of Bld.SSR 1.00 Cum 1004.00 1 Cum
Add Labour component @ 1.00 Cum 1004.00 1 Cum
Sub - Total
Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Add Labour Cess @ 0%
Page 402 of 2191 data-Bld-18-19
Rate per One Cum Rs

c Plinth beams
RCC-M-25- Design Mix 1.00 Cum 6974.12 1 Cum
Centering charges ,Pg No.108 to 111 of Bld.SSR 1.00 Cum 1390.00 1 Cum
Labour charges Pg No.108 to 111 of Bld.SSR 1.00 Cum 1521.00 1 Cum
Add Labour component @ 1.00 Cum 1521.00 1 Cum
Sub - Total
Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per One Cum Rs

14 BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using
WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved
quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site , sales & other taxes on all materials including all operational, incidental and labour charges such as
weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but
excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with
minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS.
Note : 1) The cement content is adopted as 350Kg/cum for estimating purpose only.The exact quantities will be as
per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in
cost shall be deducted.

COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS


A. MATERIALS:
20mm HBG graded metal (C-Mat-S.No:47) 0.80 cum 1172.83 1 cum
Sand - (C-Mat-S.No:2) 0.40 cum 1303.00 1 cum
Cement (ENC-PH.Memo.No.146/Cement & Steel / 380.00 Kgs 4.60 1 Kgs
T1 Sub Total of - A
B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11) 0.167 day 564.00 1 day
2nd Class Mason ( labour-Irri-Semi skilled-S.N.35) 0.167 day 540.00 1 day
Mazdoor (Both Men & Women) (Labour -Irrigation- 5.600 day 510.00 1 day
Unskilled-S.No.3) Sub Total of - B
C. MACHINERY
Batching plant 0.5 cum ( 6 Cum/hr) 1.333 hour 608.10 1 hour

Vibrator hire charges ( hire- irrigation-S.N.41) 1.333 hour 205.00 1 hour

Water (including for curing) (Irrigation SSR- 1.20 kl 98.00 1 kl


S.No:M189) Sub Total of - C
BASIC COST per 1 cum

d RCC Walls of Height up to 3.66 Mts un supported Height ( steel Scaffolding )


0.4 m thick
RCC-M-25- Design Mix 1.00 Cum 7449.30 1 Cum
Centering charges -31.b.4 ,Pg No7 of PH.SSR 2.50 Sqm 1063.00 1 Sqm
Sub - Total Rs
Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Page 403 of 2191 data-Bld-18-19
Rate per One Cum Rs

15 BLD-CSTN-3-16-(31)-C : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH
BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved
quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering,
shuttering charges etc.,complete but excluding cost of steel and its fabrication charges (APSS No. 402) with
minimum cement content as per IS code for finished item of work. for RCC SLABS, BEAMS ( using Steel
Scaffolding ) Note : 1) The cement content is adopted as 350Kg/cum for estimating purpose only.The exact
quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/
Cum the defference in cost shall be deducted.

RCC SLABS, BEAMS


A. MATERIALS:
20mm HBG graded metal (C-Mat-S.No:47) 0.80 cum 1172.83 1 Cum
Sand - (C-Mat-S.No:2) 0.40 cum 1303.00 1 Cum
Cement (ENC-PH.Memo.No.146/Cement & Steel / 380.00 Kgs 4.60 1 Cum
T1 Sub Total of - A
B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11) 0.067 day 564.00 1 Cum
2nd Class Mason ( labour-Irri-Semi skilled-S.N.35) 0.133 day 540.00 1 Cum
Mazdoor (Both Men & Women) (Labour -Irrigation- 3.077 day 510.00 1 Cum
Unskilled-S.No.3) Sub Total of - B
C. MACHINERY
Batching plant 0.5 cum ( 6 Cum/hr) 0.308 hour 608.10 1 Cum

Vibrator hire charges ( hire- irrigation-S.N.41) 0.308 hour 205.00 1 hour

Water (including for curing) (Irrigation SSR- 1.200 kl 98.00 1 Cum


S.No:M189) Sub Total of - C
BASIC COST per 1 cum
Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per One Cum Rs

A RCC Dome
i RCC Dome up to 3.66 Mts height
RCC-M-25- Design Mix 1.00 Cum 5254.37 1 Cum
Material Hire Charges for centering & Scaffolding 1.00 Cum 3833.00 1 Cum
Labour Charges for centering & Scaffolding 1.00 Cum 3496.00 1 Cum
Add Labour component @ 20%
Sub - Total Rs
Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per One Cum Rs
Page 404 of 2191 data-Bld-18-19
(BLD Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with 20mm size graded machine
- crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved
CST quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc.,
N-3- to site and sales & other taxes on all materials , centering using Steel scaffolding pipes , jack props , wallers , Foot
17) plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh
batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding
cost of steel and its fabrication charges for finished item of work (APSS No. 402)
FOUNDATIONS , PLINTH , PEDESTALS ( Below Plinth)
A.MATERIALS :
4600.00
Cement 380.00 Kgs 1000 Kgs
20mm HBG graded metal 0.80 Cum 1172.83 1 Cum
Sand 0.40 Cum 1303.00 1 Cum
B.LABOUR :
1st class Mason 0.133 Nos 470.00 1 Each
2nd class Mason 0.267 Nos 450.00 1 Each
Mazdoor (both men&women) 4.600 Nos 425.00 1 Each
Add for MA @ 20% 0.20 2137.66
C.MACHINERY :
Concrete mixture 1.333 hours 397.50 1 hour
Needle vibrator 40mm ( petrol ) 1.333 hours 205.00 1 hour
Water(including for curing) 1.20 kl 98.00 1 kl
Rate per 1 cum

a Footings
Rate for Design mix M 25 1.00 Cum 6693.38 1 Cum
Hire charges of centering and scaffolding 1.00 Cum 0.00 1 Cum
Labour charges 1.00 Cum 0.00 1 Cum
Add for MA @ 20% 0.20 0.00

Overheads&Contractors Profit @13.615% 0.13615 6693.38


Rate per 1 cum
Say

B RCC SLABS
B-I RCC Slabs up to 3.66 Mts unsupported height above GL
i RCC M 25 Slabs 50 mm Thick 0.05
RCC-M-25- Design Mix 1.00 Cum 5254.37 1 Cum
Material Hire Charges for centering & Scaffolding 20.00 Sqm 236.00 1 Sqm
Labour Charges for centering & Scaffolding 20.00 Sqm 215.00 1 Sqm
Add Labour component @ 20%
Sub - Total Rs
Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per One Cum Rs

ii RCC M 25 Slabs 75 mm Thick 0.08


RCC-M-25- Design Mix 1.00 Cum 5254.37 1 Cum
Material Hire Charges for centering & Scaffolding 13.33 Sqm 236.00 1 Sqm
Page 405 of 2191 data-Bld-18-19
Labour Charges for centering & Scaffolding 13.33 Sqm 215.00 1 Sqm
Add Labour component @ 20%
Sub - Total Rs
Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per One Cum Rs

Rate for other Floors 1F 2F 3F


RCC-M-25- Design Mix 5254.37 5254.37 5254.37
Material Hire Charges for centering & Scaffolding 3145.88 3145.88 3145.88
Labour Charges for centering & Scaffolding 2865.95 1780.00 1940.00
Add extra over Labour component @ 0.2
For Manual lifting of all RCC items up to 3 Floors
only: Lift Charges of Labour, increase @ 10% on
labour charges for each upper floor on Ground
Floor Rate
For Mechanical Lifting of all RCC items: Lift
Charges of Materials only, for lifting Concrete
above 6.1 M (2nd floor onwards) Winch/ Lift hire
charges shall be allowed at the rates as given
below:
Winch hire charges ( 0.27 x 543.6 )
Total 11266.20 10180.25 10340.25
Overheads & Contractors Profit @ 13.615 1533.89 1386.04 1407.83
sub total 12800.09 11566.29 11748.08
Add VAT @ 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00
Rate per One Cum 12800.09 11566.29 11748.08

ii RCC M 25 Slabs 100 mm Thick 0.10


RCC-M-25- Design Mix 1.00 Cum 5254.37 1 Cum
Material Hire Charges for centering & Scaffolding 10.00 Sqm 236.00 1 Sqm
Labour Charges for centering & Scaffolding 10.00 Sqm 215.00 1 Sqm
Add Labour component @ 20%
Sub - Total Rs
Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per One Cum Rs

Rate for other Floors 1F 2F 3F


RCC-M-25- Design Mix 5254.37 5254.37 5254.37
Material Hire Charges for centering & Scaffolding 2360.00 2360.00 2360.00
Labour Charges for centering & Scaffolding 2150.00 8620.00 9400.00
Add extra over Labour component @ 0.2
For Manual lifting of all RCC items up to 3 Floors
only: Lift Charges of Labour, increase @ 10% on
labour charges for each upper floor on Ground
Floor Rate
Page 406 of 2191 data-Bld-18-19
For Mechanical Lifting of all RCC items: Lift
Charges of Materials only, for lifting Concrete
above 6.1 M (2nd floor onwards) Winch/ Lift hire
charges shall be allowed at the rates as given
below:
Winch hire charges ( 0.27 x 543.6 )
Total 9764.37 16234.37 17014.37
Overheads & Contractors Profit @ 13.615 1329.42 2210.31 2316.51
sub total 11093.79 18444.68 19330.88
Add VAT @ 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00
Rate per One Cum 11093.79 18444.68 19330.88

RCC M 25 Slabs 125 mm Thick 0.13


RCC-M-25- Design Mix 1.00 Cum 5254.37 1 Cum
Material Hire Charges for centering & Scaffolding 8.00 Sqm 236.00 1 Sqm
Labour Charges for centering & Scaffolding 8.00 Sqm 215.00 1 Sqm
Add Labour component @ 20%
Sub - Total Rs
Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per One Cum Rs

Rate for other Floors 1F 2F 3F 4F 5F


RCC-M-25- Design Mix 5254.37 5254.37 5254.37 5254.37 5254.37
Material Hire Charges for centering & Scaffolding 1888.00 1888.00 1888.00 1888.00 1888.00
Labour Charges for centering & Scaffolding 1720.00 1896.00 2064.00 2240.00 2408.00
Add extra over Labour component @ 0.2 344.00 379.20 412.80 448.00 481.60
For Manual lifting of all RCC items up to 3 Floors 167.89 335.78 503.66
only: Lift Charges Lifting
For Mechanical of Labour, increase
of all RCC @ 10% Lift
items: on
labour
Charges charges for each upper floor on Ground
Winch hireofcharges
Materials only,
( 0.27 for lifting
x 543.6 ) Concrete 206.94 224.18
Floor Rate
above 6.1 M (2nd floor onwards) Winch/ Lift hire
Total 9374.26 9753.35 10122.83 10037.31 10256.15
charges shall be allowed at the rates as given
Overheads
below: & Contractors Profit @ 0.14 1276.31 1327.92 1378.22 1366.58 1396.38
sub total 10650.57 11081.27 11501.05 11403.89 11652.53
Add VAT @ 0.00 0.00 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00 0.00 0.00
Rate per One Cum 10650.57 11081.27 11501.05 11403.89 11652.53

iii RCC M 25 Slabs 400 mm Thick 0.4


RCC-M-25- Design Mix 1.00 Cum 5254.37 1 Cum
Material Hire Charges for centering & Scaffolding 0.00 Sqm 236.00 1 Sqm
Labour Charges for centering & Scaffolding 0.00 Sqm 215.00 1 Sqm
Add Labour component @ 20%
Sub - Total Rs
Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per One Cum Rs
Page 407 of 2191 data-Bld-18-19

v RCC M 25 Slabs 400 mm Thick 0.4


RCC-M-25- Design Mix 1.00 Cum 5254.37 1 Cum
Material Hire Charges for centering & Scaffolding 2.50 Sqm 254.00 1 Sqm
Labour Charges for centering & Scaffolding 2.50 Sqm 232.00 1 Sqm
Add Labour component @ 20%
Sub - Total Rs
Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per One Cum Rs

Rate for other Floors 1F 2F 3F


RCC-M-25- Design Mix 5254.37 5254.37 5254.37
Material Hire Charges for centering & Scaffolding 635.00 635.00 635.00
Labour Charges for centering & Scaffolding 1080.00 1186.67 1293.33
Add extra over Labour component @ 0.2
For Manual lifting of all RCC items up to 3 Floors
only: Lift Charges of Labour, increase @ 10% on
labour charges for each upper floor on Ground
Floor Rate
For Mechanical Lifting of all RCC items: Lift
Charges of Materials only, for lifting Concrete
above 6.1 M (2nd floor onwards) Winch/ Lift hire
charges shall be allowed at the rates as given
below:
Winch hire charges ( 0.27 x 543.6 )
Total 6969.37 7076.04 7182.70
Overheads & Contractors Profit 948.88 963.40 977.92
sub total 7918.25 8039.44 8160.62
Add VAT @ 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00
Rate per One Cum 7918.25 8039.44 8160.62
ii 150mm thick roof slab at 4.05m unsupported height above GL
Rate per One Cum for 3.66m height 1.00 Cum
Add for extra height at 16.666% on every 0.610m 0.639 16.67% = 10.6%
height above 3.66m
Add 0.106 on Centering Charges i.e 254.00 10.60%
Add 0.106 on Centering Charges i.e 232.00 10.60%

Add Labour Cess @ 0%


Rate per One Cum for 4.05m height Rs

vi RCC M 25 Slabs 175 mm Thick 0.175


RCC-M-25- Design Mix 1.00 Cum 5254.37 1 Cum
Material Hire Charges for centering & Scaffolding 5.71 Sqm 243.00 1 Sqm
Labour Charges for centering & Scaffolding 5.71 Sqm 222.00 1 Sqm
Add Labour component @
Sub - Total Rs
Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Page 408 of 2191 data-Bld-18-19
Add Labour Cess @ 0%
Rate per One Cum Rs

Rate for other Floors 1F 2F 3F


RCC-M-25- Design Mix 5254.37 5254.37 5254.37
Material Hire Charges for centering & Scaffolding 1387.53 1387.53 1387.53
Labour Charges for centering & Scaffolding 1267.62 183.00 199.00
Add extra over Labour component @ 0.2
For Manual lifting of all RCC items up to 3 Floors
only: Lift Charges of Labour, increase @ 10% on
labour charges for each upper floor on Ground
Floor Rate
For Mechanical Lifting of all RCC items: Lift
Charges of Materials only, for lifting Concrete
above 6.1 M (2nd floor onwards) Winch/ Lift hire
charges
Winch hireshall be allowed
charges at the) rates as given
( 0.27 x 543.6
below:
Total 7909.52 6824.90 6840.90
Overheads & Contractors Profit 1076.88 929.21 931.39
sub total 8986.40 7754.11 7772.29
Add VAT @ 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00
Rate per One Cum 8986.40 7754.11 7772.29

vii RCC M 25 Slabs 200 mm Thick 0.200


RCC-M-25- Design Mix 1.00 Cum 5254.37 1 Cum
Material Hire Charges for centering & Scaffolding 5.00 Sqm 243.00 1 Sqm
Labour Charges for centering & Scaffolding 5.00 Sqm 222.00 1 Sqm
Add Labour component @ 20%
Sub - Total Rs
Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per One Cum Rs
Rate for other Floors 1F 2F 3F 4F 5F
RCC-M-25- Design Mix 5254.37 5254.37 5254.37 5254.37 5254.37
Material Hire Charges for centering & Scaffolding 1215.00 1215.00 1215.00 1215.00 1215.00
Labour Charges for centering & Scaffolding 1110.00 1220.00 1330.00 1440.00 1550.00
Add extra over Labour component @ 0.2 222.00 244.00 266.00 288.00 310.00
For Manual lifting of all RCC items up to 3 Floors 167.89 335.78 503.66
only: Lift Charges of Labour, increase @ 10% on
labour charges for each upper floor on Ground
For
Floor Mechanical
Rate Lifting of all RCC items: Lift
Charges of Materials
Winch hire charges ( 0.27 only, for lifting
x 543.6 ) Concrete 206.9388 224.1837
above 6.1 M (2nd floor onwards) Winch/ Lift hire
Total 7969.26 8269.15 8569.03 8404.31 8553.55
charges shall be allowed at the rates as given
Overheads
below: & Contractors Profit @ 0.14 1085.01 1125.84 1166.67 1144.25 1164.57
sub total 9054.27 9394.99 9735.70 9548.56 9718.12
Add VAT @ 0.00 0.00 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00 0.00 0.00
Rate per One Cum 9054.27 9394.99 9735.70 9548.56 9718.12
Page 409 of 2191 data-Bld-18-19
viii RCC M 25 Slabs 250 mm Thick 0.25
RCC-M-25- Design Mix 1.00 Cum 5254.37 1 Cum
Material Hire Charges for centering & Scaffolding 4.00 Sqm 243.00 1 Sqm
Labour Charges for centering & Scaffolding 4.00 Sqm 222.00 1 Sqm
Add Labour component @ 20%
Sub - Total Rs
Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per One Cum Rs

Rate for other Floors 1F 2F 3F 4F 5F


RCC-M-25- Design Mix 5254.37 5254.37 5254.37 5254.37 5254.37
Material Hire Charges for centering & Scaffolding 972.00 972.00 972.00 972.00 972.00
Labour Charges for centering & Scaffolding 888.00 976.00 1064.00 1152.00 1240.00
Add extra over Labour component @ 0.2 177.60 195.20 212.80 230.40 248.00
For Manual lifting of all RCC items up to 3 Floors 167.89 335.78 503.66
only: Lift Charges of Labour, increase @ 10% on
labour charges for each upper floor on Ground
Floor Rate
For Mechanical Lifting of all RCC items: Lift
Charges
Winch hireofcharges
Materials only,
( 0.27 for lifting
x 543.6 ) Concrete 206.9388 224.1837
above 6.1 M (2nd floor onwards) Winch/ Lift hire
Total 7459.86 7733.35 8006.83 7815.71 7938.55
charges shall be allowed at the rates as given
Overheads
below: & Contractors Profit @ 0.14 1015.66 1052.9 1090.13 1064.11 1080.83
sub total 8475.52 8786.25 9096.96 8879.82 9019.38
Sub - Total 0.00 0.00 0.00 0.00 0.00
Add VAT @ 0.00 0.00 0.00 0.00 0.00
Rate per One Cum 8475.52 8786.25 9096.96 8879.82 9019.38

ix RCC M 25 Slabs 325 mm Thick 0.325


RCC-M-25- Design Mix 1.00 Cum 5254.37 1 Cum
Material Hire Charges for centering & Scaffolding 3.08 Sqm 254.00 1 Sqm
Labour Charges for centering & Scaffolding 3.08 Sqm 232.00 1 Sqm
Add Labour component @ 20%
Sub - Total Rs
Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per One Cum Rs

C RCC Beams: ( Steel Scaffolding )


i RCC Beams up to 3.66 Mts height
RCC-M-25- Design Mix 1.00 Cum 5254.37 1 Cum
Material Hire Charges for centering & Scaffolding 1.00 Cum 2085.00 1 Cum
Labour Charges for centering & Scaffolding 1.00 Cum 1903.00 1 Cum
Add Labour component @
Sub - Total Rs
Overheads & Contractors Profit 13.615%
Sub - Total
Page 410 of 2191 data-Bld-18-19
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per One Cum Rs

Rate for other Floors 1F 2F 3F 4F


RCC-M-25- Design Mix 5254.37 5254.37 5254.37 5254.37
Material Hire Charges for centering & Scaffolding 2085.00 2085.00 2085.00 2085.00
Labour Charges for centering & Scaffolding 1903.00 2093.00 2283.00 2474.00
For Manual lifting of all RCC items up to 3 Floors
only: Lift Charges of Labour, increase @ 10% on
labour charges for each upper floor on Ground
Floor Rate
For Mechanical Lifting of all RCC items: Lift
Charges of Materials only, for lifting Concrete
above 6.1 M (2nd floor onwards) Winch/ Lift hire
charges shall be allowed at the rates as given
below:
Winch hire charges ( 0.27 x 562.90 )
Total 9242.37 9432.37 9622.37
Overheads & Contractors Profit @ 0.13615 1258.35 1284.22 1310.09
sub total 10500.72 10716.59 10932.46
Add VAT @ 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00
Rate per One Cum 10500.72 10716.59 10932.46

ii Beams 4.05m unsupported height above GL


Rate per One Cum for 3.66m height 1.00 Cum
Add for extra height at 16.666% on every 0.610m 0.639 16.67% = 10.6%
height above 3.66m
Add 0.106 on Centering Charges i.e 2085.00 10.60%
Add 0.106 on Centering Charges i.e 1903.00 10.60%

Add Labour Cess @ 0%


Rate per One Cum for 4.05m height Rs

D RCC M -20 for Sun shades of 0.60M width,


75mm th. at fixed end and 50mm th. at free end
RCC-M-25- Design Mix 0.0625 Cum 5254.37 1 Cum
Material Hire Charges for centering & Scaffolding 1.00 Sqm 233.00 1 Sqm
Labour Charges for centering & Scaffolding 1.00 Sqm 248.00 1 Sqm
Add Labour component @ 20%
Rs
Overheads & Contractors Profit 13.615%
Sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per One Sqm Rs

Rate for other Floors 1F 2F 3F 4F


RCC-M-25- Design Mix 328.40 328.40 328.40 328.40
Material Hire Charges for centering & Scaffolding 233.00 233.00 233.00 233.00
Labour Charges for centering & Scaffolding 248.00 273.00 297.00 322.00
Page 411 of 2191 data-Bld-18-19
For Manual lifting of all RCC items up to 3 Floors
only: Lift Charges of Labour, increase @ 10% on
labour charges for each upper floor on Ground
Floor Rate
For Mechanical Lifting of all RCC items: Lift
Charges of Materials only, for lifting Concrete
above 6.1 M (2nd floor onwards) Winch/ Lift hire
charges
Winch hire shall be allowed
charges at the )rates as given
( 0.27 x 562.90
below:
Total 809.40 834.40 858.40 883.40
Overheads & Contractors Profit 110.20 113.60 116.87 120.27
sub total 919.60 948.00 975.27 1003.67
Add VAT @ 0.00 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00 0.00
Rate per One Cum 919.60 948.00 975.27 1003.67

16 BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild
steel (MS) steel bars ( Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour
charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of
approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement
work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages
such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all
incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other
taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126

Unit = t
(a) Material
HYSD bars including 5 per cent for overlaps and 1.05 Ton 46000.00 1 Ton
wastage -(ENC-PH.Memo.No.146/Cement
Binding wire- SSR (Irrigation) item No 3, & Steel / 6.00 kg 50.00 1 kg
T1 / 2013-14)
Sub-Total -A
B) LABOUR for cutting, bending, shifting to site,
tying, lap splicing and placing in position
Bar bender (Labour-Irrigation-Skilled-S.N.1) 10.00 day 678.00 1 day
Mazdoor (Unskilled) 10.00 day 510.00 1 day
Sub-Total -B
Total of A+B
(d) Contractor’s profit on (a+b+c) 13.615%
Rate per t = a+b+c+d 1 MT
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per One MT Sub Total:
Rate per One Kg Rs.
Rate for other Floors 1F 2F 3F
Basic rate per 10 Sqm 60480.00 60480.00 60480.00
For Lift Charges of Labour, increase @ 10% on 1188.00 2376.00 3564.00
labour charges of respective item for each upper
floor on Ground Floor Rate - Add Area Allowances
as applicable on labour charges vide Pg.131 of
Bld.Std.data
Total 61668.00 62856.00 64044.00
Material Hire Charges for centering & Scaffolding 8396.10 8557.84 8719.59
sub total 70064.10 71413.84 72763.59
Add VAT @ 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00
Rate per 1MT 70064.10 71413.84 72763.59
Rate per 1 Kg 70.06 71.41 72.76
MASONRY
Page 412 of 2191 data-Bld-18-19
17 BLD-CSTN-5-1 (39) ; Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor
1:3 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of
Seigniorage charges on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift
charges , curing charges etc., complete for finished item of work
A. MATERIALS:
Cement (ENC-PH.Memo.No.146/Cement & Steel / 96.00 Kg 4.60 1 Kg
T1)
Bricks traditional size 23 x 11 x 7 cms 2nd class 512 Nos 5.70 1 Nos
Ground moulded size 23x11x7 Cm - (1:6)

( C-Mat-S.No.63)
Sand - (C-Mat-S.No:2) 0.20 Cum 1303.00 1 Cum
Sub Total of - A
B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11) 0.24 day. 564.00 1 day.
2nd Class Mason ( labour-Irri-Semi skilled-S.N.35) 0.56 day. 540.00 1 day.
Mazdoor (Both Men & Women) (Labour -Irrigation- 1.89 day. 510.00 1 day.
Unskilled-S.No.3)
Sub Total of - B
Total A+B Rs
c.Overheads & Contractors Profit 13.615%
Sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Grand Total
Rate per One Cum Rs

Rate for other Floors 1F 2F 3F


Basic rate per 1Cum 5022.26 5022.26 5022.26
Material Hire Charges for Scaffolding 44.87 44.870 44.87
Labour Charges for Scaffolding 345.48 494.70 643.87
Add extra over Labour component
For Lift Charges of Labour, increase @ 10% on
labour charges of respective item for each upper
floor on Ground Floor Rate - Add Area Allowances
as applicable on labour charges vide Pg.131 of
Bld.Std.data
Total 5412.61 5561.83 5711.00
Overheads & Contractors Profit 736.93 757.24 777.55
sub total 6149.54 6319.07 6488.55
Add VAT @ 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00
Rate per One Cum 6149.54 6319.07 6488.55

18 BLD-CSTN-5-2 (40) : Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor
1:4 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of
Seigniorage charges on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift
charges , curing charges etc., complete for finished item of work
A. MATERIALS:
Cement (ENC-PH.Memo.No.146/Cement & Steel / 72.00 Kg 4.60 1 Kg
ulded size 23x11x7 Cm - (1:4)

T1 / 2013-14)
Bricks traditional size 23 x 11 x 7 cms 2nd class 512 Nos 5.70 1 Nos
(Sand
C-Mat-S.No.63)
- (C-Mat-S.No:2) 0.20 Cum 1303.00 1 Cum
Sub Total of - A
B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11) 0.24 day. 564.00 1 day.
2nd Class Mason ( labour-Irri-Semi skilled-S.N.35) 0.56 day. 540.00 1 day.
Mazdoor (Both Men & Women) (Labour -Irrigation- 1.89 day. 510.00 1 day.
Unskilled-S.No.3)
Ground moulded size 23x
Page 413 of 2191 data-Bld-18-19
Sub Total of - B
Total A+B Rs
c.Overheads & Contractors Profit 13.615%
Sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Grand Total
Rate per One Cum Rs

Rate for other Floors 1F 2F 3F


Basic rate per 1Cum 4911.86 4911.86 4911.86
Material Hire Charges for Scaffolding 44.87 44.870 44.87
Labour Charges for Scaffolding 345.48 494.70 643.87
Add extra over Labour component
For Lift Charges of Labour, increase @ 10% on
labour charges of respective item for each upper
floor on Ground Floor Rate - Add Area Allowances
as applicable on labour charges vide Pg.131 of
Bld.Std.data
Total 5302.21 5451.43 5600.60
Overheads & Contractors Profit @ 0.14 721.90 742.21 762.52
sub total 6024.11 6193.64 6363.12
Add VAT @ 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00
Rate per One Cum 6024.11 6193.64 6363.12

18 BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor
1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of
Seigniorage charges on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift
charges , curing charges etc., complete for finished item of work
A. MATERIALS:
Cement (ENC-PH.Memo.No.146/Cement & Steel / 48.00 Kg 4.60 1 Kg
Ground moulded size 23x11x7 Cm - (1:6)

T1 / 2013-14)
Bricks traditional size 23 x 11 x 7 cms 2nd class 512 Nos 5.70 1 Nos
(Sand
C-Mat-S.No.63)
- (C-Mat-S.No:2) 0.20 Cum 1303.00 1 Cum
Sub Total of - A
B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11) 0.24 day. 564.00 1 day.
2nd Class Mason ( labour-Irri-Semi skilled-S.N.35) 0.56 day. 540.00 1 day.
Mazdoor (Both Men & Women) (Labour -Irrigation- 1.89 day. 510.00 1 day.
Unskilled-S.No.3)
Total A+B Rs
c.Overheads & Contractors Profit 13.615%
Sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Grand Total
Rate per One Cum Rs

Rate for other Floors 1F 2F 3F


Basic rate per 1Cum 4801.46 4801.46 4801.46
Material Hire Charges for Scaffolding 44.87 44.870 44.87
Labour Charges for Scaffolding 345.48 494.70 643.87
Page 414 of 2191 data-Bld-18-19
For Lift Charges of Labour, increase @ 10% on
labour
Total charges of respective item for each upper 5191.81 5341.03 5490.20
floor on Ground Floor Rate - Add Area Allowances
Overheads & Contractors
as applicable Profit
on labour charges vide Pg.131 of 706.86 727.18 747.49
sub total
Bld.Std.data 5898.67 6068.21 6237.69
Add VAT @ 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00
Rate per One Cum 5898.67 6068.21 6237.69

19 BLD-CSTN-5-17-(55): Brick Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 225 x
140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and
stone dust including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing
etc., cpomplete with a compresive strength not lessthan 50 kg/sqm for walls for Superstructure Walls.
A. MATERIALS:
Flyash Blocks size 29 x 22.5 x 14 cms (C-Mat- 99 Nos 23.00 1 Nos
S.N.66)
Cost of Cement Mortar ( 1:6 ) -Mortars-(g) 0.10 Cum 2773.65 1 Cum
Flyash blocks - 290 x 225 x 140 mm - (1:6)

B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11) 0.42 day. 564.00 1 day.
2nd Class Mason ( labour-R&B-Semi skilled- 0.92 day. 540.00 1 day.
S.N.44)
Mazdoor (Both Men & Women) (Labour -Irrigation- 2.80 day. 510.00 1 day.
Unskilled-S.No.3)

Total A+B Rs
c.Overheads & Contractors Profit 13.615%
Sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Grand Total
Rate per One Cum Rs

Rate for other Floors 1F 2F 3F 4F 5F


Basic rate per 1Cum 4716.05 4716.05 4716.05 4716.05 4716.05
Material Hire Charges for Scaffolding 45.87 45.870 45.87 45.87 45.87
Labour Charges for Scaffolding 353.16 505.69 658.18 810.71 963.20
Add extra over Labour component 70.63 101.14 131.64 162.14 192.64
For Lift Charges of Labour, increase @ 10% on
labour charges of respective item for each upper
floor on Ground Floor Rate - Add Area Allowances
as applicable on labour charges vide Pg.131 of
Bld.Std.data
Total 5185.71 5368.75 5551.74 5734.77 5917.76
Overheads & Contractors Profit @ 0.14 706.03 730.96 755.87 780.79 805.70
sub total 5891.74 6099.71 6307.61 6515.56 6723.46
Add VAT @ 0.00 0.00 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00 0.00 0.00
Rate per One Cum 5891.74 6099.71 6307.61 6515.56 6723.46

20 BLD-CSTN-5-17-(55): Brick Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 200 x
140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and
stone dust including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing
etc., cpomplete with a compresive strength not lessthan 50 kg/sqm for walls for Superstructure Walls.
A. MATERIALS:
m - (1:6)
Page 415 of 2191 data-Bld-18-19
Flyash Blocks size 29 x 20 x 14 cms (C-Mat, 111 Nos 20.00 1 Nos

Flyash blocks - 290 x 200 x 140 mm - (1:6)


S.No.67)
Cost of Cement Mortar ( 1:6) - ( Mortars-S.No.h) 0.10 Cum 2773.65 1 Cum

B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11) 0.42 day. 564.00 1 day.
2nd Class Mason ( labour-R&B-Semi skilled- 0.92 day. 540.00 1 day.
S.N.44)
Mazdoor (Both Men & Women) (Labour -Irrigation- 2.80 day. 510.00 1 day.
Unskilled-S.No.3)
Total A+B Rs
c.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Grand Total
Rate per One Cum Rs

Rate for other Floors 1F 2F 3F 4F 5F


Basic rate per 1Cum 4659.05 4659.05 4659.05 4659.05 4659.05
Material Hire Charges for Scaffolding 51.6 51.600 51.6 51.6 51.6
Labour Charges for Scaffolding 397.30 568.90 740.45 912.05 1083.60
Add extra over Labour component 79.46 113.78 148.09 182.41 216.72
For Lift Charges of Labour, increase @ 10% on 216.17 432.34 648.50 864.67 1080.84
labour charges of respective item for each upper
floor on Ground Floor Rate - Add Area Allowances
as applicable on labour charges vide Pg.131 of
Bld.Std.data
Total 5403.58 5825.67 6247.69 6669.78 7091.81
Overheads & Contractors Profit 735.70 793.16 850.62 908.09 965.55
sub total 6139.28 6618.83 7098.31 7577.87 8057.36
Add VAT @ 0.00 0.00 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00 0.00 0.00
Rate per One Cum 6139.28 6618.83 7098.31 7577.87 8057.36

21 BLD-CSTN-5-17-(55): Brick Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 150 x
140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and
stone dust including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing
etc., cpomplete with a compresive strength not lessthan 50 kg/sqm for walls for Superstructure Walls.

A. MATERIALS:
Flyash blocks - 290 x 150 x 140 mm - (1:6)

Flyash Blocks size 29 x 15 x 14 cms (C-Mat, 148 Nos 14.00 1 Nos


S.No.68)
Cost of Cement Mortar ( 1:6 ) 0.10 Cum 2773.65 1 Cum

B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11) 0.42 day. 564.00 1 day.
2nd Class Mason ( labour-R&B-Semi skilled- 0.92 day. 540.00 1 day.
S.N.44)
Mazdoor (Both Men & Women) (Labour -Irrigation- 2.80 day. 510.00 1 day.
Unskilled-S.No.3)
Total A+B Rs
c.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Grand Total
Flyash bl
Page 416 of 2191 data-Bld-18-19
Rate per One Cum Rs

Rate for other Floors 1F 2F 3F 4F 5F


Basic rate per 1Cum 4511.05 4511.05 4511.05 4511.05 4511.05
Material Hire Charges for Scaffolding 68.80 68.80 68.80 68.80 68.80
Labour Charges for Scaffolding 529.73 758.53 987.27 1216.07 1444.80
Add extra over Labour component 105.95 151.71 197.45 243.21 288.96
For Lift Charges of Labour, increase @ 10% on 216.17 432.34 648.50 864.67 1080.84
labour charges of respective item for each upper
floor on Ground Floor Rate - Add Area Allowances
as applicable on labour charges vide Pg.131 of
Bld.Std.data
Total 5431.70 5922.43 6413.07 6903.80 7394.45
Overheads & Contractors Profit 739.53 806.34 873.14 939.95 1006.75
sub total 6171.23 6728.77 7286.21 7843.75 8401.20
Add VAT @ 0.00 0.00 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00 0.00 0.00
Rate per One Cum 6171.23 6728.77 7286.21 7843.75 8401.20
22 BLD-CSTN-5-17-(55): Brick Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 112/100
x 140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and
stone dust including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing
etc., cpomplete with a compresive strength not lessthan 50 kg/sqm for walls for Superstructure Walls.
A. MATERIALS:
Flyash Blocks size 29 x 10 x 14 cms (C-Mat, 198 Nos 8.00 1 Nos
Flyash blocks - 290 x 100 x 140 mm - (1:6)

S.No.69)
Cost of Cement Mortar ( 1:6 ) ( Mortars-g) 0.10 Cum 2773.65 1 Cum

B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11) 0.42 day. 564.00 1 day.
2nd Class Mason ( labour-R&B-Semi skilled- 0.92 day. 540.00 1 day.
S.N.44)
Mazdoor (Both Men & Women) (Labour -Irrigation- 2.80 day. 510.00 1 day.
Unskilled-S.No.3)

Total A+B Rs
c.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Grand Total
Rate per One Cum Rs

Rate for other Floors 1F 2F 3F 4F 5F


Basic rate per 1Cum 4023.05 4023.05 4023.05 4023.05 4023.05
Material Hire Charges for Scaffolding 92.14 92.14 92.14 92.14 92.14
Labour Charges for Scaffolding 709.46 1015.89 1322.23 1628.66 1935.00
Add extra over Labour component 141.89 203.18 264.45 325.73 387.00
For Lift Charges of Labour, increase @ 10% on 216.17 432.34 648.50 864.67 1080.84
labour charges of respective item for each upper
floor on Ground Floor Rate - Add Area Allowances
as applicable on labour charges vide Pg.131 of
Bld.Std.data
Total 5182.71 5766.60 6350.37 6934.25 7518.03
Overheads & Contractors Profit 705.63 785.12 864.60 944.10 1023.58
sub total 5888.34 6551.72 7214.97 7878.35 8541.61
Add VAT @ 0.00 0.00 0.00 0.00 0.00
Page 417 of 2191 data-Bld-18-19
Add Labour Cess @ 0.00 0.00 0.00 0.00 0.00
Rate per One Cum 5888.34 6551.72 7214.97 7878.35 8541.61

19 BLD-CSTN-5-11 (49) : 11.5 cm wide Brick masonry for super-structure on ground floor in cm (1:3) using second class
traditional size bricks including cost of all materials, seigniorage charges, labour and all operations for constructing
half brick masonry, mixing cement mortar, curing etc., complete for finished item of work, but excluding conveyance
charges of materials.
A. MATERIALS:
Bricks traditional size 23 x 11 x 7 cms 2nd class 565 Nos 5.70 1 Nos
Cement 106.00 Kg 4.60 1 Kg
11.5 cm wide Brick masonry - (1:3)

Fine aggregate (Sand) 0.22 Cum 1303.00 1 Cum

B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11) 0.60 day. 564.00 1 day.
2nd Class Mason ( labour-R&B-Semi skilled- 0.60 day. 540.00 1 day.
S.N.44)
Mazdoor (Both Men & Women) (Labour -Irrigation- 2.75 day. 510.00 1 day.
Unskilled-S.No.3)

Add Water charges@ 1% 1%


Total A+B Rs
c.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs

Rate for other Floors 1F 2F 3F


Basic rate per 1Cum 6128.00 6128.00 6128.00
Material Hire Charges for Scaffolding 89.74 89.74 89.74
Labour Charges for Scaffolding 690.96 989.39 1287.74
For Lift Charges of Labour, increase @ 10% on
labour charges of respective item for each upper
floor on Ground Floor Rate - Add Area Allowances
as applicable on labour charges vide Pg.131 of
Bld.Std.data
Total 6908.70 7207.13 7505.48
Overheads & Contractors Profit @ 0.13615 940.62 981.25 1021.87
sub total 7849.32 8188.38 8527.35
Add VAT @ 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00
Rate per One Cum 7849.32 8188.38 8527.35

(BLD Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with 20mm size graded machine
- crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved
CST quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc.,
N-3- to site and sales & other taxes on all materials , centering using Steel scaffolding pipes , jack props , wallers , Foot
17) plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh
batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding
cost of steel and its fabrication charges for finished item of work (APSS No. 402)
FOUNDATIONS , PLINTH , PEDESTALS ( Below Plinth)
A.MATERIALS :

Cement 380.00 Kgs 4600.00 1000 Kgs


Page 418 of 2191 data-Bld-18-19
20mm HBG graded metal 0.80 Cum 1172.83 1 Cum
Sand 0.40 Cum 1303.00 1 Cum
B.LABOUR :
1st class Mason 0.133 Nos 470.00 1 Each
2nd class Mason 0.267 Nos 450.00 1 Each
Mazdoor (both men&women) 4.600 Nos 425.00 1 Each
Add for MA @ 20% 0.20 2137.66
C.MACHINERY :
Concrete mixture 1.333 hours 397.50 1 hour
Needle vibrator 40mm ( petrol ) 1.333 hours 205.00 1 hour
Water(including for curing) 1.20 kl 98.00 1 kl
Rate per 1 cum

a Footings
Rate for Design mix M 25 1.00 Cum 6693.38 1 Cum
Hire charges of centering and scaffolding 1.00 Cum 0.00 1 Cum
Labour charges 1.00 Cum 0.00 1 Cum
Add for MA @ 20% 0.20 0.00

Overheads&Contractors Profit @13.615% 0.13615 6693.38


Rate per 1 cum
Say

20 BLD-CSTN-6-5-(60) : Construction of CRS Masonary 1st Sort in Cement Mortor ( 1:6 ) Prop using hard granite
stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage
Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor,
Construction, Scaffolding Charges curing etc., complete for finished item of Work .

A. MATERIALS:
Cement 67.20 Kg 4.60 1 Kg
Coursed Rubble Stone 0.94 Cum 615.60 1 Cum
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum 0.16 Cum 1300.60 1 Cum
Fine aggregate (Sand) 0.28 Cum 1303.00 1 Cum
B. LABOUR:
Mason 1st class 2.50 day 564.00 1 day
Mazdoor (unskilled) 2.32 day 510.00 1 day
Total A+B Rs
C.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per One Cum Rs
Page 419 of 2191 data-Bld-18-19
20 BLD-CSTN-6-6-(61) : Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite
stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage
Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor,
Construction, Scaffolding Charges curing etc., complete for finished item of Work .
A. MATERIALS:
Cement 76.80 Kg 4.60 1 Kg
Coursed Rubble Stone 0.94 Cum 615.60 1 Cum
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum 0.16 Cum 1300.60 1 Cum
Fine aggregate (Sand) 0.32 Cum 1303.00 1 Cum
B. LABOUR:
Mason 1st class 1.50 day 564.00 1 day
Mazdoor (unskilled) 2.32 day 510.00 1 day
Total A+B Rs
C.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per One Cum Rs

21 BLD-CSTN-6-12-(67) : Construction of RR Masonary in Cement Mortor ( 1:6 ) Prop using hard granite stone
including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage
Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor
,Construction, Scaffolding Charges curing etc., complete for finished item of Work .

A. MATERIALS:
Cement 79.20 Kg 4.60 1 Kg
Coursed Rubble Stone 0.44 Cum 615.60 1 Cum
Rough Stone 0.50 Cum 350.60 1 Cum
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum 0.16 Cum 1300.60 1 Cum
Fine aggregate (Sand) 0.33 Cum 1303.00 1 Cum
B. LABOUR:
Mason 1st class 1.20 day 564.00 1 day
Mazdoor (unskilled) 2.00 day 510.00 1 day
Total A+B Rs
C.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per One Cum Rs

21 BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone
including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage
Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor
,Construction, Scaffolding Charges curing etc., complete for finished item of Work .

A. MATERIALS:
Cement 59.40 Kg 4.60 1 Kg
Coursed Rubble Stone 0.44 Cum 615.60 1 Cum
Rough Stone 0.50 Cum 350.60 1 Cum
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum 0.16 Cum 1300.60 1 Cum
Fine aggregate (Sand) 0.33 Cum 1303.00 1 Cum
B. LABOUR:
Mason 1st class 1.20 day 564.00 1 day
Page 420 of 2191 data-Bld-18-19
Mazdoor (unskilled) 2.00 day 510.00 1 day
Total A+B Rs
C.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per One Cum Rs
Page 421 of 2191 data-Bld-18-19

POINTING AND PLASTERING


22 BLD-CSTN-7-1-(72) : Providing flush Cement Pointing to CRS Masonary in Cement Mortor (1:3) Prop . for including
cost & conveyance of all materials to site , seignaiorage charges on all materials, labour charges on all materials,
curing etc., Complete for finished item of work
A. MATERIALS:
Cement 14.40 Kg 4.60 1 Kg
Fine aggregate (Sand) (C-Mat-Sn.3) 0.03 Cum 1493.00 1 Cum
B. LABOUR:
Mason 2nd class 0.50 day 540.00 1 day
Mazdoor (unskilled) 0.74 day 510.00 1 day
Total Rs
C.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs

22 BLD-CSTN-7-3-(74) : Providing raised Cement Pointing to RR Masonary in Cement Mortor (1:3) Prop . for including
cost & conveyance of all materials to site , seignaiorage charges on all materials, labour charges on all materials,
curing etc., Complete for finished item of work
A. MATERIALS:
Cement 28.80 Kg 4.60 1 Kg
Fine aggregate (Sand) 0.06 Cum 1303.00 1 Cum
B. LABOUR:
Mason 2nd class 0.50 day 540.00 1 day
Mazdoor (unskilled) 0.74 day 510.00 1 day
Total Rs
C.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs

23 BLD-CSTN-7-3-(74) : Providing raised or Cut Cement Pointing on coursed or Ashlar stone masonry or concrete block
walling in white cement mortar 1 : 3 (1 white cement : 3 marble dust).including cost & conveyance of all materials to
site , seignaiorage charges on all materials, labour charges on all materials, curing etc., Complete for finished item of
work
A. MATERIALS:
Cement mortar ( 1:4) 0.038 Cum 3325.65 1 Cum
B. LABOUR:
Mason 2nd class 1.46 day 540.00 1 day
Mazdoor (unskilled) 2.26 day 510.00 1 day
Total Rs
C.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs
Page 422 of 2191 data-Bld-18-19

23 BLD-CSTN-8-1-(76) : Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and
conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all
operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for
finished item of work. (As per SS 903). per 10 Sqm.( only for Ceiling)
A. MATERIALS:
Cement Mortor (1:3) 0.15 Cum 3877.65 1 Cum
B. LABOUR:
Mason 1st class 0.60 day 564.00 1 day
Mazdoor (unskilled) 0.96 day 510.00 1 day
Sub-Total of Labour
Total A+B Rs
C.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs

Rate for other Floors 1F 2F 3F


Basic rate per 1Cum 1409.65 1409.65 1409.65
Material Hire Charges for Scaffolding ( for Ceiling) 24.60 24.60 24.60
Labour Charges for Scaffolding ( for Ceiling) 159.10 225.70 292.30
Add extra over Labour component
For Lift Charges of Labour, increase @ 10% on
labour charges of respective item for each upper
floor on Ground Floor Rate - Add Area Allowances
as applicable on labour charges vide Pg.131 of
Bld.Std.data
Total 1593.35 1659.95 1726.55
Overheads & Contractors Profit @ 0.13615 216.93 226.00 235.07
sub total 1810.28 1885.95 1961.62
Add VAT @ 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00
Rate per 10 Sqm 1810.28 1885.95 1961.62
Rate per 1 Sqm 181.03 188.60 196.16

24 BLD-CSTN-8-2-(77) : Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and
conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all
operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for
finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:4) 0.15 Cum 3325.65 1 Cum
B. LABOUR:
Mason 1st class 0.60 day 564.00 1 day
Mazdoor (unskilled) 0.96 day 510.00 1 day
Sub-Total of Labour
Total A+B
C.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Page 423 of 2191 data-Bld-18-19
Rate per 1 Sqm Rs

Rate for other Floors 1F 2F 3F


Basic rate per 1Cum 1326.85 1326.85 1326.85
Material Hire Charges for Scaffolding 10.30 10.30 10.30
Labour Charges for Scaffolding 79.50 113.80 148.00
Add extra over Labour component
For Lift Charges of Labour, increase @ 10% on
labour charges of respective item for each upper
floor on Ground Floor Rate - Add Area Allowances
as applicable on labour charges vide Pg.131 of
Total 1416.65 1450.95 1485.15
Bld.Std.data
Overheads & Contractors Profit @ 0.13615 192.88 197.55 202.20
sub total 1609.53 1648.50 1687.35
Add VAT @ 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00
Rate per 10 Sqm 1609.53 1648.50 1687.35
Rate per 1 Sqm 160.95 164.85 168.74

25 BLD-CSTN-8-4-(79): Plastering with 12mm thick in single coat in CM (1:6) finished smooth including cost and
conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all
operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for
finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:6) 0.15 Cum 2773.65 1 Cum
B. LABOUR:
Mason 1st class 0.60 day 564.00 1 day
Mazdoor (unskilled) 0.96 day 510.00 1 day
Sub-Total of Labour
Total A+B Rs
C.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs

Rate for other Floors 1F 2F 3F 4F 5F


Basic rate per 1Cum 1244.05 1244.05 1244.05 1244.05 1244.05
Material Hire Charges for Scaffolding 10.30 10.30 10.30 10.30 10.30
Labour Charges for Scaffolding 79.50 113.80 148.00 182.40 216.70
Add extra over Labour component 15.90 22.76 29.60 36.48 43.34
For Lift Charges of Labour, increase @ 10% on 82.80 165.60 248.40 331.20 414.00
labour charges of respective item for each upper
floor on Ground Floor Rate - Add Area Allowances
as applicable on labour charges vide Pg.131 of
Bld.Std.data
Total 1432.55 1556.51 1680.35 1804.43 1928.39
Overheads & Contractors Profit @ 0.13615 195.04 211.92 228.78 245.67 262.55
sub total 1627.59 1768.43 1909.13 2050.10 2190.94
Add VAT @ 0.00 0.00 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00 0.00 0.00
Rate per 10 Sqm 1627.59 1768.43 1909.13 2050.10 2190.94
Page 424 of 2191 data-Bld-18-19
Rate per 1 Sqm 162.76 176.84 190.91 205.01 219.09

26 BLD-CSTN-8-6-(81) : Plastering with 15mm thick in single coat in CM (1:4) finished smooth including cost and
conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all
operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for
finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:4) 0.19 Cum 3325.65 1 Cum
B. LABOUR:
Mason 1st class 0.60 day 564.00 1 day
Mazdoor (unskilled) 0.96 day 510.00 1 day
Sub-Total of Labour
Total A+B Rs
C.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs

Rate for other Floors 1F 2F 3F 4F 5F


Basic rate per 1Cum 1459.87 1459.87 1459.87 1459.87 1459.87
Material Hire Charges for Scaffolding 10.30 10.30 10.30 10.30 10.30
Labour Charges for Scaffolding 79.50 113.80 148.00 182.40 216.70
Add extra over Labour component 15.90 22.76 29.60 36.48 43.34
For Lift Charges of Labour, increase @ 10% on 82.80 165.60 248.40 331.20 414.00
labour charges of respective item for each upper
floor on Ground Floor Rate - Add Area Allowances
as applicable on labour charges vide Pg.131 of
Bld.Std.data
Total 1648.37 1772.33 1896.17 2020.25 2144.21
Overheads & Contractors Profit @ 0.13615 224.43 241.30 258.16 275.06 291.93
sub total 1872.80 2013.63 2154.33 2295.31 2436.14
Add VAT @ 0.00 0.00 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00 0.00 0.00
Rate per 10 Sqm 1872.80 2013.63 2154.33 2295.31 2436.14
Rate per 1 Sqm 187.28 201.36 215.43 229.53 243.61

27 BLD-CSTN-8-7-(82) : Plastering with 20mm thick in single coat in CM (1:4) finished smooth including cost and
conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all
operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for
finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:4) 0.21 Cum 3325.65 1 Cum
B. LABOUR:
Mason 1st class 0.94 day 564.00 1 day
Mazdoor (unskilled) 1.60 day 510.00 1 day
Sub-Total of Labour
Total A+B Rs
C.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Page 425 of 2191 data-Bld-18-19
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs

Rate for other Floors 1F 2F 3F 4F 5F


Basic rate per 1Cum 2044.55 2044.55 2044.55 2044.55 2044.55
Material Hire Charges for Scaffolding 10.30 10.30 10.30 10.30 10.30
Labour Charges for Scaffolding 79.50 113.80 148.00 182.40 216.70
Add extra over Labour component 15.90 22.76 29.60 36.48 43.34
For Lift Charges of Labour, increase @ 10% on 134.62 269.23 403.85 538.46 673.08
labour charges of respective item for each upper
floor on Ground Floor Rate - Add Area Allowances
as applicable on labour charges vide Pg.131 of
Bld.Std.data
Total 2284.87 2460.64 2636.30 2812.19 2987.97
Overheads & Contractors Profit @ 0.13615 311.09 335.02 358.93 382.88 406.81
sub total 2595.96 2795.66 2995.23 3195.07 3394.78
Add VAT @ 0.00 0.00 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00 0.00 0.00
Rate per 10 Sqm 2595.96 2795.66 2995.23 3195.07 3394.78
Rate per 1 Sqm 259.60 279.57 299.52 319.51 339.48

25 BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of
4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand ,
Water, etc., to site, seigniorage charges, all operational, including charges, labour charges for mixing mortar,
finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished
item of work of uneven surfaces of walls. (External walls)

Unit = 10 sqm
A. MATERIALS:
Base Coat in CM(1:6), 16 mm thick
Cement 43.00 Kg 4.60 1 Kg
Fine aggregate (Sand) 0.18 Cum 1303.00 1 Cum
Top Coat in CM(1:4), 4 mm thick
Cement 14.50 Kg 4.60 1 Kg
Fine aggregate (Sand) 0.04 Cum 1303.00 1 Cum
Sub-Total- for Cost of Material
B. LABOUR:
Mason 1st class 0.63 day 564.00 1 day
Mason 2nd class 1.47 day 540.00 1 day
Mazdoor (unskilled) 3.90 day 510.00 1 day
Sub-Total- for Cost of Labour
Total Rs
C.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs

Rate for other Floors 1F 2F 3F


Basic rate per 1Cum 3689.28 3689.28 3689.28
Material Hire Charges for Scaffolding 10.30 10.30 10.30
Labour Charges for Scaffolding 79.50 113.80 148.00
Add extra over Labour component
Page 426 of 2191 data-Bld-18-19
For Lift Charges of Labour, increase @ 10% on
labour charges of respective item for each upper
floor on Ground Floor Rate - Add Area Allowances
as applicable on labour charges vide Pg.131 of
Total 3779.08 3813.38 3847.58
Bld.Std.data
Overheads & Contractors Profit @ 0.13615 514.52 519.19 523.85
sub total 4293.60 4332.57 4371.43
Add VAT @ 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00
Rate per 10 Sqm 4293.60 4332.57 4371.43
Rate per 1 Sqm 429.36 433.26 437.14

26 BLD-CSTN-8-10 - (85) : Plastering 12mm thick two coats with base coat of 8mm thick in C.M. (1:5) and top coat of
4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand ,
Water, etc., to site, seigniorage charges, all operational, including charges, labour charges for mixing mortar,
finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished
item of work.
Unit = 10 sqm
A. MATERIALS:
Base Coat in CM (1:5), 8 mm thick
Cement 31.70 Kg 4.60 1 Kg
Fine aggregate (Sand) 0.11 Cum 1303.00 1 Cum
Top Coat in CM (1:4), 4 mm thick
Cement 19.20 Kg 4.60 1 Kg
Fine aggregate (Sand) 0.04 Cum 1303.00 1 Cum
Sub-Total- for Cost of Material
B. LABOUR:
Mason 1st class 0.63 day 564.00 1 day
Mason 2nd class 1.47 day 540.00 1 day
Mazdoor (unskilled) 3.90 day 510.00 1 day
Sub-Total- for Cost of Labour
Total Rs
C.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs

Rate for other Floors 1F 2F 3F 4F 5F


Basic rate per 1Cum 3567.71 3567.71 3567.71 3567.71 3567.71
Material Hire Charges for Scaffolding 10.30 10.30 10.30 10.30 10.30
Labour Charges for Scaffolding 79.50 113.80 148.00 182.40 216.70
Add extra over Labour component 15.90 22.76 29.60 36.48 43.34
For Lift Charges of Labour, increase @ 10% on 313.81 627.62 941.44 1255.25 1569.06
labour charges of respective item for each upper
floor on Ground Floor Rate - Add Area Allowances
as applicable on labour charges vide Pg.131 of
Bld.Std.data
Total 3987.22 4342.19 4697.05 5052.14 5407.11
Overheads & Contractors Profit @ 0.13615 542.86 591.19 639.50 687.85 736.18
sub total 4530.08 4933.38 5336.55 5739.99 6143.29
Add VAT @ 0.00 0.00 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00 0.00 0.00
Rate per 10 Sqm 4530.08 4933.38 5336.55 5739.99 6143.29
Page 427 of 2191 data-Bld-18-19
Rate per 1 Sqm 453.01 493.34 533.66 574.00 614.33

27 BLD-CSTN-8-11-(86) : RCM facia 5cm thick in CM (1:3) for drop walls, fins with rabbit wire mesh & nominal
reinforcement as directed by Engineer-in-charge with dubara sponge finishing, including cost & conveyance of all
materials to site, seigniorage charges, sales & other taxes on all materials, operational & incidental, cost and
conveyance of cement, wire mesh, water to work site, centering, scaffolding and form work, lift charges etc., complete
for finished items of work but excluding cost of steel & its fabrication charges, for finished item of work. (APSS No.403
& 903)
Unit - 10 sqm
A) MATERIALS
Rabbit wire mesh - TBSC-E.I-12 13.30 sqm 19.00 1 sqm
Cement Mortar 1:3 for 25 mm thick 0.25 cum 3877.65 1 cum
Dry Cement for making Lumps 50.00 kg 4.60 1 kg
12 mm plastering 2 coats in 1:4 & 1:2 cm both 21.80 sqm 1409.65 10 sqm
sides Excluding HYSD Steel/ Mild steel & Binding
wire Sub-Total- for Cost of Material
B) LABOUR CHARGES
1st Class Mason 8.00 day 564.00 1 day
Miller Operator 1.00 day 540.00 1 day
Mazdoor (unskilled) 10.00 day 510.00 1 day
Sub-Total- for Cost of Labour
c) Machinery
Machine Mixing Mortar with Miller - Hire charges 2.00 Hrs 303.10 1 Hrs
Total Rs
over heads & contractors profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs

Rate for other Floors 1F 2F 3F 4F 5F


Basic rate per 10 Sqm 15283.35 15283.35 15283.35 15283.35 15283.35
For Lift Charges of Labour, increase @ 10% on 1015.20 2030.40 3045.60 4060.80 5076.00
labour charges of respective item for each upper
floor on Ground Floor Rate - Add Area Allowances
as applicable on labour charges vide Pg.131 of
Bld.Std.data
Total 16298.55 17313.75 18328.95 19344.15 20359.35
Overheads & Contractors Profit @ 0.13615 2219.05 2357.27 2495.49 2633.71 2771.93
sub total 18517.60 19671.02 20824.44 21977.86 23131.28
Add VAT @ 0.00 0.00 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00 0.00 0.00
Rate per 10 Sqm 18517.60 19671.02 20824.44 21977.86 23131.28
Rate per 1 Sqm 1851.76 1967.10 2082.44 2197.79 2313.13

FLOORING, DADOING, CLADING & SKIRTING


28 BLD-CSTN-9-1-(99) : Flooring with Polished Shabad stones 1st class 25 to 30 mm thick (Tandur Stone slabs)
set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like
consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like
cement, sand, and water and flooring stones etc., complete, including seigniorage charges, labour charges for
dressing of flooring stones etc., complete for finished item of work, including the cost and conveyance of all materials.
Unit = 10 sqm
Page 428 of 2191 data-Bld-18-19
A. MATERIALS:
Polished Shahabad / Tandur stone slabs of all 11.00 sqm 95.00 1 sqm
sizes between 25 -30mm thickness - TBSC-B.I-07
Cement for CM (1:8) proportion for base coat 21.60 kg. 4.60 1 kg.
Cement for slurry 33.00 kg. 4.60 1 kg.
Cement for jointing 20.00 kg. 4.60 1 kg.
Sand for CM (1:8) proportion (C-Mat-Sn.3) 0.12 cum 1303.00 1 cum
Sub-Total- for Cost of Material
B. LABOUR:
Mason 1st class 3.10 day 564.00 1 day
Mason 2 class
nd
1.10 day 540.00 1 day
Mazdoor (unskilled) 0.86 day 510.00 1 day
Sub-Total- for Cost of Labour
Sub-Total
Add water charges 1% 1.00%
Grand Total Rs
over heads & contractors profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs

26 BLD-CSTN-9-1-(99) : Flooring with Polished Shabad stones 1st class 15 to 18 mm thick (Tandur Stone slabs)
set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like
consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like
cement, sand, and water and flooring stones etc., complete, including seigniorage charges, labour charges for
dressing of flooring stones etc., complete for finished item of work, including the cost and conveyance of all materials.
Unit = 10 sqm
A. MATERIALS:
Polished Shahabad / Tandur stone slabs of all 11.00 sqm 164.00 1 sqm
sizes between 15 -18mm thickness - TBSC-B.I-03
Cement for CM (1:8) proportion for base coat 21.60 kg. 4.60 1 kg.
Cement for slurry 33.00 kg. 4.60 1 kg.
Cement for jointing 20.00 kg. 4.60 1 kg.
Sand for CM (1:8) proportion (C-Mat-Sn.3) 0.12 cum 1303.00 1 cum
Sub-Total- for Cost of Material
B. LABOUR:
Mason 1st class 3.10 day 564.00 1 day
Mason 2 class
nd
1.10 day 540.00 1 day
Mazdoor (unskilled) 0.86 day 510.00 1 day
Sub-Total- for Cost of Labour
Sub-Total
Add water charges 1% 1.00%
Grand Total Rs
over heads & contractors profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs
Page 429 of 2191 data-Bld-18-19
Rate for other Floors 1F 2F 3F
Basic rate per 10 Sqm 5135.37 5135.37 5135.37
For Lift Charges of Labour, increase @ 10% on
labour
Total charges of respective item for each upper 5135.37 5135.37 5135.37
floor on Ground Floor Rate - Add Area Allowances
Overheads & Contractors
as applicable Profit @ 0.13615
on labour charges vide Pg.131 of 699.18 699.18 699.18
sub total
Bld.Std.data 5834.55 5834.55 5834.55
Add VAT @ 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00
Rate per 10 Sqm 5834.55 5834.55 5834.55
Rate per 1 Sqm 583.46 583.46 583.46

27 BLD-CSTN-9-1-(99) - A : Flooring with Polished Bethamcherla coloured stone minimum 25 mm thick (0.254M
x 0.254M) set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of
honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all
materials like cement, sand, and water and flooring stones etc., complete, including seigniorage charges, labour
charges for dressing of flooring stones etc., complete for finished item of work, including the cost and conveyance of
all materials.
Unit = 10 sqm
A. MATERIALS:
Polished Bethamcherla coloured stone 22 to 25 11.00 sqm 273.00 1 sqm
mm thick of all sizes - TBSC-B.I-09
Cement for CM (1:8) proportion for base coat 21.60 kg. 4.60 1 kg.
Cement for slurry 33.00 kg. 4.60 1 kg.
Cement for jointing 20.00 kg. 4.60 1 kg.
Sand for CM (1:8) proportion (C-Mat-Sn.3) 0.12 cum 1303.00 1 cum
Sub-Total- for Cost of Material
B. LABOUR:
Mason 1st class 3.10 day 564.00 1 day
Mason 2 class
nd
1.10 day 540.00 1 day
Mazdoor (unskilled) 0.86 day 510.00 1 day
Sub-Total- for Cost of Labour
Sub-Total
Add water charges 1% 1.00%
Grand Total Rs
over heads & contractors profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs

Rate for other Floors 1F 2F 3F 4F 5F


Basic rate per 10 Sqm 6346.36 6346.36 6346.36 6346.36 6346.36
For Lift Charges of Labour, increase @ 10% on 278.10 556.20 834.30 1112.40 1390.50
labour charges of respective item for each upper
floor on Ground Floor Rate - Add Area Allowances
as applicable on labour charges vide Pg.131 of
Bld.Std.data
Total 6624.46 6902.56 7180.66 7458.76 7736.86
Overheads & Contractors Profit @ 0.13615 901.92 939.78 977.65 1015.51 1053.37
sub total 7526.38 7842.34 8158.31 8474.27 8790.23
Add VAT @ 0.00 0.00 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00 0.00 0.00
Rate per 10 Sqm 7526.38 7842.34 8158.31 8474.27 8790.23
Page 430 of 2191 data-Bld-18-19
Rate per 1 Sqm 752.64 784.23 815.83 847.43 879.02

28 BLD-CSTN-9-2-(100) : Flooring with 50 mm thick Rough Cuddapah/ Shahbad stones, set over base coat of
cement mortar (1 : 8) 12 mm thick over CC bed already laid or RCC roof slab, including pointing with cement mortar
1:3 duly filling joints nearly, including cost of all materials like flooring stone, cement, sand, and water etc., complete,
including seigniorage charges, labour charges for dressing of flooring stones etc., complete for finished item of
work,including the cost and conveyance of all materials.
A. MATERIALS:
Kadapa slabs of 50 mm thick of all sizes -TBSC- 10.50 Sqm 110.00 1 Sqm
B.I-05
Cement for CM (1:8) proportion for base coat 21.60 Kg 4.60 1 Kg
Cement for CM 1:3 proportion for pointing 9.60 Kg 4.60 1 Kg
Sand for CM (1:8) proportion 0.12 Cum 1493.00 1 Cum
Sand for CM (1:3) proportion 0.02 Cum 1493.00 1 Cum
Sub-Total- for Cost of Material
B. LABOUR:
Mason 1st class 0.960 day 564.00 1 day
Mason 2nd class 2.240 day 540.00 1 day
Mazdoor (unskilled) 3.30 day 510.00 1 day
Sub-Total- for Cost of Labour
Total Rs
over heads & contractors profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs

29 BLD-CSTN-9-4-(102) : Flooring with precast terrazzo chequered tiles conforming to IS: 13801 Supplying
precast terrazzo chequered tiles conforming to IS:13801 using marble aggregates of size 10mm, sand, marble
powder, white cement pigments etc., with terrazzo topping not less than 6 mm of tiles overall size not less than
20 mm thick any coloured shades. set over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid
or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed with
neat cement to full depth mixed with pigment of matching shade including cost of all materials like cement, sand
water and tiles etc., complete, including seigniorage charges, complete for finished item of work, including the cost
and conveyance of all materials.
Unit = 10 sqm
A. MATERIALS:
Chequerred terrazzo tiles of 20 mm thick --TBSC- 10.50 sqm 285.00 1 sqm
C.VII-03
Cement for CM (1:6) proportion for base coat 28.80 kg. 4.60 1 kg.
Cement for slurry 33.00 kg. 4.60 1 kg.
Cement for jointing & pointing 6.00 kg. 4.60 1 kg.
Pigment 0.00 kg. 1 kg.
Sand for CM (1:6) proportion 0.12 cum 1493.00 1 cum
Sub-Total- for Cost of Material
B. MACHINERY
Nill
C. LABOUR
Mason 2nd class 0.960 day 540.00 1 day
Man mazdoor 2.240 day 510.00 1 day
Mazdoor (unskiled) 3.30 day 510.00 1 day
Sub-Total- for Cost of Labour
Page 431 of 2191 data-Bld-18-19
Add water charges 1% 1.00%
Total Rs
over heads & contractors profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs

Rate for other Floors 1F 2F 3F 4F 5F


Basic rate per 10 Sqm 6895.61 6895.61 6895.61 6895.61 6895.61
For Lift Charges of Labour, increase @ 10% on 334.38 668.76 1003.14 1337.52 1671.90
labour charges of respective item for each upper
floor on Ground Floor Rate - Add Area Allowances
as applicable on labour charges vide Pg.131 of
Bld.Std.data
Total 7229.99 7564.37 7898.75 8233.13 8567.51
over heads & contractors profit 984.36 1029.89 1075.41 1120.94 1166.47
sub total 8214.35 8594.26 8974.16 9354.07 9733.98
Add VAT @ 0.00 0.00 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00 0.00 0.00
Rate per 10 Sqm 8214.35 8594.26 8974.16 9354.07 9733.98
Rate per 1 Sqm 821.44 859.43 897.42 935.41 973.40

30 BLD-CSTN-9-5-(103) :Flooring with Ordinary Soluble salt porcelain vitrified tiles screen printed and
polished of size 400 x 400 mm and thickness between 8-9 mm 1st quality conforming to IS:13711,
IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base
coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of
honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with
pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including
seigniorage charges, etc., complete for finished item of work, including the cost and conveyance of all materials.
Unit = 10 sqm
A. MATERIALS:
Vitrified tiles of 1st quality of size- medium shade 10.50 sqm 0.00 1 sqm
-400 x 400 x 8 to 9mm -TBSC-C.II-01
Cement for CM (1:8) for base coat 21.60 kg. 4.60 1 kg.
Cement for slurry 33.00 kg. 4.60 1 kg.
Cement for Pointing with CM (1:3) 6.000 kg. 4.60 1 kg.
Sand for CM (1:8) 0.12 cum 1493.00 1 cum
Sand for pointing 0.020 cum 1493.00 1 cum
Sub-Total- for Cost of Material
B. LABOUR
Mason 1st class 0.96 day 564.00 1 day
Mason 2nd class 2.24 day 540.00 1 day
Mazdoor (unskiled) 3.30 day 510.00 1 day
Sub-Total- for Cost of Labour

Add water charges 1% 1.00%


Sub- Total
over heads & contractors profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Page 432 of 2191 data-Bld-18-19
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs

Rate for other Floors 1F 2F 3F 4F 5F


Basic rate per 10 Sqm 3961.04 3961.04 3961.04 3961.04 3961.04
For Lift Charges of Labour, increase @ 10% on 343.40 686.81 1030.21 1373.62 1717.02
labour charges of respective item for each upper
floor on Ground Floor Rate - Add Area Allowances
as applicable on labour charges vide Pg.131 of
Bld.Std.data
sub total 4304.44 4647.85 4991.25 5334.66 5678.06
over heads & contractors profit 586.05 632.80 679.56 726.31 773.07
sub total 4890.49 5280.65 5670.81 6060.97 6451.13
Add VAT @ 0.00 0.00 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00 0.00 0.00
Rate per 10 Sqm 4890.49 5280.65 5670.81 6060.97 6451.13
Rate per 1 Sqm 489.05 528.07 567.08 606.10 645.11

27 BLD-CSTN-9-5-(103) : Flooring with Nano polished /stain free soluble salt porcelain vitrified tiles screen
printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711,
IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of
cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey
like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment
of matching shade, including cost of all materials like cement, sand water and tiles etc. including seigniorage charges,
etc., complete for finished item of work, including the cost and conveyance of all materials.

Unit = 10 sqm
A. MATERIALS:
Nano polished Vitrified tiles of size--600 x 600 mm 10.50 sqm 421.00 1 sqm
x 8-10 mm thickness - TBSC-C.II-03
Cement for CM (1:8) for base coat 21.60 kg. 4.60 1 kg.
Cement for slurry 33.00 kg. 4.60 1 kg.
Cement for Pointing with CM (1:3) 6.000 kg. 4.60 1 kg.
Sand for CM (1:8) 0.12 cum 1493.00 1 cum
Sand for pointing 0.020 cum 1493.00 1 cum
Sub-Total- for Cost of Material
B. LABOUR
Mason 1st class 0.96 day 564.00 1 day
Mason 2nd class 2.24 day 540.00 1 day
Mazdoor (unskiled) 3.30 day 510.00 1 day
Sub-Total- for Cost of Labour

Add water charges 1% 1.00%


Grand Total
over heads & contractors profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs

Rate for other Floors 1F 2F 3F


Basic rate per 10 Sqm 8425.74 8425.74 8425.74
Page 433 of 2191 data-Bld-18-19
For Lift Charges of Labour, increase @ 10% on
labour charges of respective item for each upper
floor on Ground Floor Rate - Add Area Allowances
as applicable on labour charges vide Pg.131 of
Bld.Std.data
Total 8425.74 8425.74 8425.74
over heads & contractors profit 1147.16 1147.16 1147.16
sub total 9572.90 9572.90 9572.90
Add VAT @ 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00
Rate per 10 Sqm 9572.90 9572.90 9572.90
Rate per 1 Sqm 957.29 957.29 957.29

28 BLD-CSTN-9-5-(103) : Flooring with Double charged / multi charged stain free full body porcelain vitrified
tiles with double layer pigment of size 800 x 800 mm and thickness between 9-11 mm 1st quality
conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and
designs, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab,
including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement
paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and
tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, including the cost and
conveyance of all materials.

Unit = 10 sqm
A. MATERIALS:
Double charged Vitrified polished floor tiles of size 10.50 sqm 600.00 1 sqm
800 x 800 x 9-11 mm thickness - TBSC-C.II-06
Cement for CM (1:8) for base coat 21.60 kg. 4.60 1 kg.
Cement for slurry 33.00 kg. 4.60 1 kg.
Cement for Pointing with CM (1:3) 6.000 kg. 4.60 1 kg.
Sand for CM (1:8) 0.12 cum 1493.00 1 cum
Sand for pointing 0.020 cum 1493.00 1 cum
Sub-Total- for Cost of Material
B. LABOUR
Mason 1st class 0.96 day 564.00 1 day
Mason 2nd class 2.24 day 540.00 1 day
Mazdoor (unskiled) 3.30 day 510.00 1 day
Sub-Total- for Cost of Labour

Add water charges 1% 1.00%


Grand Total
over heads & contractors profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs

Rate for other Floors 1F 2F 3F 4F 5F


Basic rate per 10 Sqm 10324.04 10324.04 10324.04 10324.04 10324.04
For Lift Charges of Labour, increase @ 10% on 343.40 686.81 1030.21 1373.62 1717.02
labour charges of respective item for each upper
floor on Ground Floor Rate - Add Area Allowances
as applicable on labour charges vide Pg.131 of
Bld.Std.data
Total 10667.44 11010.85 11354.25 11697.66 12041.06
Page 434 of 2191 data-Bld-18-19
over heads & contractors profit 1452.37 1499.13 1545.88 1592.64 1639.39
sub total 12119.81 12509.98 12900.13 13290.30 13680.45
Add VAT @ 0.00 0.00 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00 0.00 0.00
Rate per 10 Sqm 12119.81 12509.98 12900.13 13290.30 13680.45
Rate per 1 Sqm 1211.98 1251.00 1290.01 1329.03 1368.05

28 BLD-CSTN-9-6-(104) : Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300
mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630
(Parts 1 to 15) of any colour and finish in all shades and design, set over base coat of cement mortar (1:8),
12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency
spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching
shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges,
etc., complete for finished item of work,including the cost and conveyance of all materials.

Unit = 10 sqm
A. MATERIALS:
Ceramic floor tiles - 7-8mm thick - TBSC-C.I-01 10.50 sqm 300.00 1 sqm
Cement for CM (1:8) for base coat 21.60 kg. 4.60 1 kg.
Cement for slurry 33.00 kg. 4.60 1 kg.
White cement - TBSC-R.I-01 2.00 kg. 29.00 1 kg.
Sand for CM (1:8) 0.12 cum 1303.00 1 cum
Sub-Total- for Cost of Material
B. LABOUR
Mason 1st class 0.96 Nos 564.00 1 Nos
Mason 2 class
nd
2.24 Nos 540.00 1 Nos
Mazdoor (unskiled) 3.30 Nos 510.00 1 Nos
Sub-Total- for Cost of Labour
Sub total of Material and Labour
Add water charges 1% 1.00%
Grand Total Rs
over heads & contractors profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs

Rate for other Floors 1F 2F 3F


Basic rate per 10 Sqm 7120.06 7120.06 7120.06
For Lift Charges of Labour, increase @ 10% on
labour charges of respective item for each upper
floor on Ground Floor Rate - Add Area Allowances
as applicable on labour charges vide Pg.131 of
Bld.Std.data
Total 7120.06 7120.06 7120.06
over heads & contractors profit 969.40 969.40 969.40
sub total 8089.46 8089.46 8089.46
Add VAT @ 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00
Rate per 10 Sqm 8089.46 8089.46 8089.46
Rate per 1 Sqm 808.95 808.95 808.95
Page 435 of 2191 data-Bld-18-19
29 BLD-CSTN-9-6-(104) : Flooring with Non-skid red or white full body Ceramic floor tiles of scratch free-
stain free and scratch free-nano finish of size 600 x 600 mm and thickness between 8-10 mm 1st
quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades
and designs, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab,
including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement
paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and
tiles etc., complete, including seigniorage charges, etc., complete for finished item of work,including the cost and
conveyance of all materials.

Unit = 10 sqm
A. MATERIALS:
Ceramic floor tiles - 600 x 600 mm and thickness 10.50 sqm 485.00 1 sqm
between 8-10 mm - TBSC-C.I-04
Cement for CM (1:8) for base coat 21.60 kg. 4.60 1 kg.
Cement for slurry 33.00 kg. 4.60 1 kg.
White cement - TBSC-R.I-01 2.00 kg. 29.00 1 kg.
Sand for CM (1:8) 0.12 cum 1303.00 1 cum
Sub-Total- for Cost of Material
B. LABOUR
Mason 1st class 0.96 Nos 564.00 1 Nos
Mason 2 class
nd
2.24 Nos 540.00 1 Nos
Mazdoor (unskiled) 3.30 Nos 510.00 1 Nos
Sub-Total- for Cost of Labour
Sub total of Material and Labour
Add water charges 1% 1.00%
Grand Total Rs
over heads & contractors profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs

Rate for other Floors 1F 2F 3F 4F 5F


Basic rate per 10 Sqm 9081.98 9081.98 9081.98 9081.98 9081.98
For Lift Charges of Labour, increase @ 10% on 343.40 686.81 1030.21 1373.62 1717.02
labour charges of respective item for each upper
floor on Ground Floor Rate - Add Area Allowances
Total 9425.38 9768.79 10112.19 10455.60 10799.00
as applicable on labour charges vide Pg.131 of
over heads
Bld.Std.data& contractors profit 1283.27 1330.02 1376.77 1423.53 1470.28
sub total 10708.65 11098.81 11488.96 11879.13 12269.28
Add VAT @ 0.00 0.00 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00 0.00 0.00
Rate per 10 Sqm 10708.65 11098.81 11488.96 11879.13 12269.28
Rate per 1 Sqm 1070.87 1109.88 1148.90 1187.91 1226.93

29 BLD-CSTN-9-7-(105) :Flooring with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than
black / premium colours slabs set over base coat of cement mortar (1:8), 20 mm thick over CC bed already laid or
RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with
white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement,
sand water and tilesetc., complete, including seigniorage charges, labour charges for dressing of tilesetc., complete
for finished item of work,including the cost and conveyance of all materials.

Unit = 10 sqm
A. MATERIALS:
Page 436 of 2191 data-Bld-18-19
High polished granite 16 to 18 mm thick slab other 10.50 sqm 3118.00 1 sqm
than black - TBSC-B.III-01
Cement for CM (1:8) for base coat 36.00 kg. 4.60 1 kg.
Cement for slurry 33.00 kg. 4.60 1 kg.
White cement for jointing & pointing 6.00 kg. 29.00 1 kg.
Cement for jointing kg.
Sand for CM (1:8) 0.20 cum 1303.00 1 cum
Sub-Total- for Cost of Material
B. LABOUR
Mason 1st class 3.00 day 564.00 1 day
Mason 2nd class 1.00 day 540.00 1 day
Mazdoor (unskiled) 8.00 day 510.00 1 day
Sub-Total- for Cost of Labour
Sub total of Material and Labour
Add water charges 1% 1.00%
Grand Total
over heads & contractors profit 13.615%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total cost for 10 sqm
Rate per 10 Sqm
Rate per 1 Sqm Rs

Rate for other Floors 1F 2F 3F


Basic rate per 10 Sqm 39866.12 39866.12 39866.12
For Lift Charges of Labour, increase @ 10% on
labour charges of respective item for each upper
floor
Total on Ground Floor Rate - Add Area Allowances 39866.12 39866.12 39866.12
as applicable on labour charges vide Pg.131 of
over heads & contractors profit
Bld.Std.data 5427.77 5427.77 5427.77
sub total 45293.89 45293.89 45293.89
Add VAT @ 0.00 0.00 0.00
Add Labour Cess @ 0.00 0.00 0.00
Rate per 10 Sqm 45293.89 45293.89 45293.89
Rate per 1 Sqm 4529.39 4529.39 4529.39
Page 437 of 2191 data-Bld-18-19
KODADA MUNICIPALITY
BASED ON - 2018 - 2019 SSR
43344

Amount
asphalt concrete upto 75 mm thick ) including water bound macadam and
e trench work. as directed by the departmental officers.
1042.00
0.00
141.87
1183.87
0.00
1183.87

tacking of excavated materials for pipe line trench work. as directed by the

2169.00
0.00
295.31
2464.31
0.00
2464.31

including soiling and stacking of excavated materials for pipe line trench
ers.
267.00
0.00
36.35
303.35
0.00
303.35

in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and


initial lead of 10m including all operational, incidental, labour charges such
etc. complete for finished item of work including seigniorage excluding
APSS 308).

0.00
1856.40
0.00
1856.40
0.00
1856.40
252.75
2109.15
210.92
0.00
0.00
210.92
Page 438 of 2191 data-Bld-18-19
s 2.36mm and below in trenches, sides of foundations and basement with
hick, consolidating each deposited layer by watering and ramming including
and all operational, incidental, labour charges, hire charges of T & P etc.,
NO. 309 & 310)

4649.70

0.00
158.10
4807.80
654.58
5462.38
0.00
0.00
5462.38
910.40
910.40

in trenches, sides of foundations and basement with initial lead in layers


g each deposited layer by watering and ramming including cost and
perational, incidental, labour charges, hire charges of T & P etc., complete
& 310)

889.56

0.00
158.10
1047.66
142.64
1190.30
0.00
0.00
1190.30
198.38
198.38

xture all works up to Plinth Level: Plain Cement concrete nominal mix
arse aggregate ) using 20mm size Hard Granite Machine Crushed Metal
erials like cement, sand, coarse aggregate water etc., to site , seigniorage
s , for mixing , laying, concrete , ramming in 15 cm layers, finishing top
mplete for finished item of work.for foundation and under flooring bed.

745.20
1130.58
586.35
117.60
Page 439 of 2191 data-Bld-18-19
397.50

56.40
708.90
3742.53
509.55
4252.08
0.00
0.00
4252.08
4252.08

xture up to Plinth Level : Plain Cement concrete M20 grade nominal


egate ) using Coarse aggregate 20mm size graded Metal including cost
nt, sand, coarse aggregate water etc., to site , seigniorage charges on all
laying, concrete , ramming in 15 cm layers, finishing top surface to the
hed item of work with nomonal reinforcement

1518.00
1055.54
586.35
117.60

397.50

56.40
708.90
4440.29
604.55
5044.84
0.00
0.00
5044.84
5044.84

4440.29
177.61
4617.90
630.34
5248.25

4440.29
444.03
4884.32
666.71
Page 440 of 2191 data-Bld-18-19
5551.03
ixture up to Plinth Level : Plain Cement concrete (M 15) Nominal Mix
aggregate ) using 40, 20 & 10mm size Hard Granite Machine Crushed
all materials like cement, sand, coarse aggregate water etc., to site ,
abour charges , for mixing , laying, concrete , ramming in 15 cm layers,
uring etc., complete for finished item of work.

1265.00
431.97
339.17
89.10
625.44
117.60

397.50

0.00

56.40
708.90
4031.08
548.83
4579.91
0.00
0.00
4579.91
4579.91

ixture up to Plinth Level : Plain Cement concrete (M 15) Nominal Mix


aggregate ) using 20mm graded metal of Hard Granite Machine Crushed
all materials like cement, sand, coarse aggregate water etc., to site ,
abour charges , for mixing , laying, concrete , ramming in 15 cm layers,
uring etc., complete for finished item of work.

1265.00
316.66
625.44
117.60

397.50

0.00

56.40
708.90
3487.50
474.82
3962.32
Page 441 of 2191 data-Bld-18-19
0.00
0.00
3962.32
3962.32

ix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate)


20mm size graded machine crushed hard granite metal (coarse aggregate)
conveyance of all materials like cement, fine aggregate (sand) coarse
ng Seigniorage charges, sales & other taxes on all materials including all
es such as machine mixing, laying concrete, curing etc.,complete but
charges for finished item of work, but including centering and shuttering
DESTALS

S (Below Plinth)

1055.54
586.35
1518.00

75.01

144.18
1836.00

397.50

205.00

117.60
5935.18

5935.18
288.00

631.00
126.20
6980.38
950.38
7930.76
0.00
0.00
7930.76

5935.18
Page 442 of 2191 data-Bld-18-19
328.00
1004.00
200.80
7467.98
1016.77
8484.75
0.00
0.00
8484.75

5935.18
1390.00
1521.00
304.20
9150.38
1245.82
10396.20
0.00
0.00
10396.20

ix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate)


20mm size graded machine crushed hard granite metal (coarse aggregate)
conveyance of all materials like cement, fine aggregate (sand) coarse
ng Seigniorage charges, sales & other taxes on all materials including all
es such as machine mixing, laying concrete, curing etc.,complete but
charges for finished item of work, but including centering and shuttering
TANKS, RCC WALLS IN BUILDINGS - WOODEN SCAFFOLDING

CC WALLS IN BUILDINGS

1055.54
586.35
1840.00

3481.89

94.19
90.18
2397.00

2581.37

397.50

0.00

205.00
0.00
117.60
720.10
Page 443 of 2191 data-Bld-18-19
6783.36
923.55
7706.91
0.00
0
7706.91
7706.91

6783.36
238.00
1757.00

8778.36
1195.17
9973.53
0.00
0.00
9973.53

6783.36
790.00
1251.00

8824.36
1201.44
10025.80
0.00
0.00
10025.80
Page 444 of 2191 data-Bld-18-19

ix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate)


20mm size graded machine crushed hard granite metal (coarse aggregate)
conveyance of all materials like cement, fine aggregate (sand) coarse
ng Seigniorage charges, sales & other taxes on all materials including all
es such as machine mixing, laying concrete, curing etc.,complete but
charges for finished item of work, but including centering and shuttering
EN SCAFFOLDING

AFFOLDING

1055.54
586.35
1840.00
3481.89

37.79
71.82
1275.00
1384.61

106.13

54.74
117.60
278.47
5144.97
700.49
5845.46
0
0
5845.46
5845.50
Page 445 of 2191 data-Bld-18-19

m
5144.97
1580.00
1670.00
334.00
8728.97
1188.45
9917.42
0
0
9917.42
9917.45

m
5144.97
1264.00
1336.00
267.20
8012.17
1090.86
9103.03
0
0
9103.03
9103.05
Page 446 of 2191 data-Bld-18-19

m
5144.97
1053.86
1113.89
222.78
7535.50
1025.96
8561.46
0
0
8561.46
8561.50

5144.97
1395.00
1473.00
294.60
Page 447 of 2191 data-Bld-18-19
8307.57
1131.08
9438.65
0
0
9438.65
9438.65

75mm th. at fixed end and 50mm th. at free end - up to 3.66m above GL

321.56
156.00
192.00
38.40
707.96
96.39
804.35
0
0
804.35
804.35
Page 448 of 2191 data-Bld-18-19
Page 449 of 2191 data-Bld-18-19

lacing of the M-25 Design Mix Concrete corresponding to IS 456 using


ed machine crushed hard granite metal (coarse aggregate) from approved
all materials like cement, fine aggregate (sand) coarse aggregate, water
materials including all operational, incidental and labour charges such as
ncrete, vibrating, curing, centering and suttering charges etc.,complete but
l and its fabrication charges for finished item of work (APSS No. 402) with
or PLINTH, PEDESTALS and FOOTINGS.
as 350Kg/cum for estimating purpose only.The exact quantities will be as
e cement content is found to be less than 350 Kgs/ Cum the defference in

S (Below Plinth)

938.26
521.20
1748.00

75.01
144.18
2346.00

810.60

273.27

117.60
6974.12

6974.12
0.00
0.00

6974.12
949.53
7923.65
0.00
0.00
7923.65

6974.12
328.00
1004.00
200.80
8506.92
1158.22
9665.14
0.00
0.00
Page 450 of 2191 data-Bld-18-19
9665.14

6974.12
1390.00
1521.00
304.20
10189.32
1387.28
11576.60
0.00
0.00
11576.60

placing of the M-25 Design Mix Concrete corresponding to IS 456 using


ed machine crushed hard granite metal (coarse aggregate) from approved
all materials like cement, fine aggregate (sand) coarse aggregate, water
materials including all operational, incidental and labour charges such as
ncrete, vibrating, curing, centering and suttering charges etc.,complete but
el and its fabrication charges for finished item of work (APSS No. 402) with
or COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS.
as 350Kg/cum for estimating purpose only.The exact quantities will be as
e cement content is found to be less than 350 Kgs/ Cum the defference in

S, RCC WALLS IN BUILDINGS

938.26
521.20
1748.00
3207.46

94.19
90.18
2856.00
3040.37

810.60

273.27

117.60
1201.47
7449.30

7449.30
2657.50
10106.80
1376.04
11482.84
0.00
0.00
Page 451 of 2191 data-Bld-18-19
11482.84

ng of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH


ed machine crushed hard granite metal (coarse aggregate) from approved
all materials like cement, fine aggregate (sand) coarse aggregate, water
charges, sales & other taxes on all materials including all operational,
gh batching, machine mixing, laying concrete, vibrating, curing, centering,
cluding cost of steel and its fabrication charges (APSS No. 402) with
e for finished item of work. for RCC SLABS, BEAMS ( using Steel
tent is adopted as 350Kg/cum for estimating purpose only.The exact
per mix design, if the cement content is found to be less than 350 Kgs/
ed.

938.26
521.20
1748.00
3207.46

37.79
71.82
1569.27
1678.88

187.29

63.14

117.60
368.03
5254.37
715.38
5969.75
0
0
5969.75
5969.75

5254.37
3833.00
3496.00
699.20
13282.57
1808.42
15090.99
0.00
0.00
15090.99
Page 452 of 2191 data-Bld-18-19
crete M 25 grade corresponding to IS 456 with 20mm size graded machine
gate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved
l materials like cement, fine aggregate (sand) coarse aggregate, water etc.,
erials , centering using Steel scaffolding pipes , jack props , wallers , Foot
tc., including all operational, incidental and labour charges such as weigh
e, curing etc., and overheads & contractors profit complete but excluding
finished item of work (APSS No. 402)

1748.00
938.26
521.20

62.51
120.15
1955.00
427.53

529.87
273.27
117.60
6693.38

6693.38
0.00
0.00
0.00
6693.38
911.30
7604.69
7604.69

m
5254.37
4720.00
4300.00

14274.37
1943.46
16217.83
0.00
0.00
16217.83

m
5254.37
3145.88
Page 453 of 2191 data-Bld-18-19
2865.95

11266.20
1533.89
12800.09
0.00
0.00
12800.09

m
5254.37
2360.00
2150.00

9764.37
1329.42
11093.79
0.00
0.00
11093.79
Page 454 of 2191 data-Bld-18-19

m
5254.37
1888.00
1720.00
344.00
9206.37
1253.45
10459.82
0.00
0.00
10459.82

m
5254.37
0.00
0.00

5254.37
715.38
5969.75
0.00
0.00
5969.75
Page 455 of 2191 data-Bld-18-19

m
5254.37
635.00
580.00
116.00
6585.37
896.6
7481.97
0.00
0.00
7481.97

7481.97

26.92
24.59
7533.49
0.00
7533.49

m
5254.37
1387.53
1267.62

7909.52
1076.88
8986.40
0.00
Page 456 of 2191 data-Bld-18-19
0.00
8986.40

m
5254.37
1215.00
1110.00
222.00
7801.37
1062.16
8863.53
0.00
0.00
8863.53
8863.53
Page 457 of 2191 data-Bld-18-19
m
5254.37
972.00
888.00
177.60
7291.97
992.80
8284.77
0.00
0.00
8284.77

m
5254.37
782.32
714.56
142.91
6894.16
938.64
7832.80
0.00
0.00
7832.80

5254.37
2085.00
1903.00

9242.37
1258.35
10500.72
Page 458 of 2191 data-Bld-18-19
0.00
0.00
10500.72

10500.72

221.01
201.72
10923.45
0.00
10923.45

328.40
233.00
248.00

809.40
110.2
919.60
0.00
0.00
919.60
919.60
Page 459 of 2191 data-Bld-18-19

d Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild


per IS 1786-1979) of different diameters for RCC works , including labour
g to required sizes and shapes, placing in position with cover blocks of
d lap-splicing with binding wire of 18 SWG, forming grills for reinforcement
ngs, including cost and conveyance of steel bars, including all wastages
r bars including cost and conveyance of binding wire, cover blocks and all
ch as cutting, bending, placing in position, tying including sales and other
shed item of work in all floors.( APSS No.126

48300.00
300.00
48600.00

6780.00
5100.00
11880.00
60480.00
8234.35
68714.35
0.00
0.00
68714.00
68.71

MASONRY
Page 460 of 2191 data-Bld-18-19
Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor
of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of
uding all labour charges like mixing Cement Mortor, scaffoding charges lift
finished item of work

441.60
2918.40

260.60
3620.60

135.36
302.40
963.90

1401.66
5022.26
683.78
5706.04
0.00
0.00
5706.04
5706.04

Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor


of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of
uding all labour charges like mixing Cement Mortor, scaffoding charges lift
finished item of work

331.20
2918.40
260.60
3510.20

135.36
302.40
963.90
Page 461 of 2191 data-Bld-18-19
1401.66
4911.86
668.75
5580.61
0.00
0.00
5580.61
5580.61

Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor


of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of
uding all labour charges like mixing Cement Mortor, scaffoding charges lift
finished item of work

220.80
2918.40
260.60
3399.80

135.36
302.40
963.90
1401.66
4801.46
653.72
5455.18
0.00
0.00
5455.18
5455.18
Page 462 of 2191 data-Bld-18-19

in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 225 x
blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and
of all materials, labour charges, seiniorage charges, scaffolding and curing
not lessthan 50 kg/sqm for walls for Superstructure Walls.

2277.00
277.37
2554.37

236.88
496.80
1428.00

2161.68
4716.05
642.09
5358.14
0.00
0.00
5358.14
5358.14

in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 200 x
blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and
of all materials, labour charges, seiniorage charges, scaffolding and curing
not lessthan 50 kg/sqm for walls for Superstructure Walls.
Page 463 of 2191 data-Bld-18-19
2220.00
277.37
2497.37

236.88
496.80
1428.00
2161.68
4659.05
634.33
5293.38
0
0
5293.38
5293.40

in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 150 x
blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and
of all materials, labour charges, seiniorage charges, scaffolding and curing
not lessthan 50 kg/sqm for walls for Superstructure Walls.

2072.00
277.37
2349.37

236.88
496.80
1428.00
2161.68
4511.05
614.18
5125.23
0.00
0.00
5125.23
Page 464 of 2191 data-Bld-18-19
5125.23

in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 112/100
d blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and
of all materials, labour charges, seiniorage charges, scaffolding and curing
not lessthan 50 kg/sqm for walls for Superstructure Walls.

1584.00
277.37
1861.37

236.88
496.80
1428.00

2161.68
4023.05
547.74
4570.79
0.00
0.00
4570.79
4570.79
Page 465 of 2191 data-Bld-18-19

masonry for super-structure on ground floor in cm (1:3) using second class


materials, seigniorage charges, labour and all operations for constructing
curing etc., complete for finished item of work, but excluding conveyance

3220.50
487.60
286.66
3994.76

338.40
324.00
1402.50

2064.90
6059.66
68.34
6128.00
834.33
6962.33
0.00
0.00
6962.33

crete M 25 grade corresponding to IS 456 with 20mm size graded machine


gate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved
l materials like cement, fine aggregate (sand) coarse aggregate, water etc.,
erials , centering using Steel scaffolding pipes , jack props , wallers , Foot
tc., including all operational, incidental and labour charges such as weigh
e, curing etc., and overheads & contractors profit complete but excluding
finished item of work (APSS No. 402)

1748.00
Page 466 of 2191 data-Bld-18-19
938.26
521.20

62.51
120.15
1955.00
427.53

529.87
273.27
117.60
6693.38

6693.38
0.00
0.00
0.00
6693.38
911.30
7604.69
7604.69

RS Masonary 1st Sort in Cement Mortor ( 1:6 ) Prop using hard granite
materials like Cement, Sand , Water, Granite Stones, including Seigniorage
for cutting Stones to required size and shape, mixing of Cement Mortor,
tc., complete for finished item of Work .

309.12
578.66
208.10
364.84

1410.00
1183.20
4053.92
551.94
4605.86
0.00
0.00
4605.86
Page 467 of 2191 data-Bld-18-19
S Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite
materials like Cement, Sand , Water, Granite Stones, including Seigniorage
for cutting Stones to required size and shape, mixing of Cement Mortor,
tc., complete for finished item of Work .

353.28
578.66
208.10
416.96

846.00
1183.20
3586.20
488.26
4074.46
0.00
0.00
4074.46

RR Masonary in Cement Mortor ( 1:6 ) Prop using hard granite stone


rials like Cement, Sand , Water, Granite Stones, including Seigniorage
for cutting Stones to required size and shape, mixing of Cement Mortor
etc., complete for finished item of Work .

364.32
270.86
175.30
208.10
429.99

676.80
1020.00
3145.37
428.24
3573.61
0.00
0.00
3573.61

RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone


rials like Cement, Sand , Water, Granite Stones, including Seigniorage
for cutting Stones to required size and shape, mixing of Cement Mortor
etc., complete for finished item of Work .

273.24
270.86
175.30
208.10
429.99

676.80
Page 468 of 2191 data-Bld-18-19
1020.00
3054.29
415.84
3470.13
0.00
0.00
3470.13
Page 469 of 2191 data-Bld-18-19

OINTING AND PLASTERING


ent Pointing to CRS Masonary in Cement Mortor (1:3) Prop . for including
, seignaiorage charges on all materials, labour charges on all materials,
ork

66.24
44.79

270.00
377.40
758.43
103.26
861.69
0.00
0.00
861.69
86.17

ment Pointing to RR Masonary in Cement Mortor (1:3) Prop . for including


, seignaiorage charges on all materials, labour charges on all materials,
ork

132.48
78.18

270.00
377.40
858.06
116.82
974.88
0.00
0.00
974.88
97.49

Cut Cement Pointing on coursed or Ashlar stone masonry or concrete block


ite cement : 3 marble dust).including cost & conveyance of all materials to
, labour charges on all materials, curing etc., Complete for finished item of

126.37

788.40
1152.60
2067.37
281.47
2348.84
0.00
0.00
2348.84
234.88
Page 470 of 2191 data-Bld-18-19

mm thick in single coat in CM (1:3) finished smooth including cost and


gniorage charges on all materials, finishing, curing, scaffolding and all
tc., including cutting grooves where ever necessary etc., complete for
r 10 Sqm.( only for Ceiling)

581.65

338.40
489.60
828.00
1409.65
191.92
1601.57
0.00
0.00
1601.57
160.16

mm thick in single coat in CM (1:4) finished smooth including cost and


gniorage charges on all materials, finishing, curing, scaffolding and all
tc., including cutting grooves where ever necessary etc., complete for
r 10 Sqm.

498.85

338.40
489.60
828.00
1326.85
180.65
1507.50
0.00
0.00
1507.50
Page 471 of 2191 data-Bld-18-19
150.75

mm thick in single coat in CM (1:6) finished smooth including cost and


gniorage charges on all materials, finishing, curing, scaffolding and all
tc., including cutting grooves where ever necessary etc., complete for
r 10 Sqm.

416.05

338.40
489.60
828.00
1244.05
169.38
1413.43
0.00
0.00
1413.43
141.34
Page 472 of 2191 data-Bld-18-19

mm thick in single coat in CM (1:4) finished smooth including cost and


gniorage charges on all materials, finishing, curing, scaffolding and all
tc., including cutting grooves where ever necessary etc., complete for
r 10 Sqm.

631.87

338.40
489.60
828.00
1459.87
198.76
1658.63
0.00
0.00
1658.63
165.86

mm thick in single coat in CM (1:4) finished smooth including cost and


gniorage charges on all materials, finishing, curing, scaffolding and all
tc., including cutting grooves where ever necessary etc., complete for
r 10 Sqm.

698.39

530.16
816.00
1346.16
2044.55
278.37
2322.92
0.00
0.00
Page 473 of 2191 data-Bld-18-19
2322.92
232.29

ck two coats with base coat of 16mm thick in C.M. (1:6) and top coat of
e finishing including cost & conveyance of all materials like cement, Sand ,
s, all operational, including charges, labour charges for mixing mortar,
including cutting grooves where ever necessary etc., complete for finished
External walls)

197.80
234.54

66.70
52.12
551.16

355.32
793.80
1989.00
3138.12
3689.28
502.3
4191.58
0.00
0.00
4191.58
419.16
Page 474 of 2191 data-Bld-18-19

thick two coats with base coat of 8mm thick in C.M. (1:5) and top coat of
e finishing including cost & conveyance of all materials like cement, Sand ,
s, all operational, including charges, labour charges for mixing mortar,
including cutting grooves where ever necessary etc., complete for finished

145.82
143.33

88.32
52.12
429.59

355.32
793.80
1989.00
3138.12
3567.71
485.74
4053.45
0.00
0.00
4053.45
405.35
Page 475 of 2191 data-Bld-18-19

hick in CM (1:3) for drop walls, fins with rabbit wire mesh & nominal
charge with dubara sponge finishing, including cost & conveyance of all
ales & other taxes on all materials, operational & incidental, cost and
o work site, centering, scaffolding and form work, lift charges etc., complete
st of steel & its fabrication charges, for finished item of work. (APSS No.403

252.70
969.41
230.00
3073.04

4525.15

4512.00
540.00
5100.00
10152.00

606.20
15283.35
2080.83
17364.18
0.00
0.00
17364.18
1736.42

NG, DADOING, CLADING & SKIRTING


hed Shabad stones 1st class 25 to 30 mm thick (Tandur Stone slabs)
y laid CC bed / RCC Roof Slab, including neat cement slurry of honey like
& Jointed with neat cement to full depth including cost of all materials like
ones etc., complete, including seigniorage charges, labour charges for
or finished item of work, including the cost and conveyance of all materials.
Page 476 of 2191 data-Bld-18-19

1045.00

99.36
151.80
92.00
156.36
1544.52

1748.40
594.00
438.60
2781.00
4325.52
43.26
4368.78
594.81
4963.59
0.00
0.00
4963.59
496.36

hed Shabad stones 1st class 15 to 18 mm thick (Tandur Stone slabs)


y laid CC bed / RCC Roof Slab, including neat cement slurry of honey like
& Jointed with neat cement to full depth including cost of all materials like
ones etc., complete, including seigniorage charges, labour charges for
or finished item of work, including the cost and conveyance of all materials.

1804.00

99.36
151.80
92.00
156.36
2303.52

1748.40
594.00
438.60
2781.00
5084.52
50.85
5135.37
699.18
5834.55
0.00
0.00
5834.55
583.46
Page 477 of 2191 data-Bld-18-19

ished Bethamcherla coloured stone minimum 25 mm thick (0.254M


over already laid CC bed / RCC Roof Slab, including neat cement slurry of
s per sqm. & Jointed with neat cement to full depth including cost of all
nd flooring stones etc., complete, including seigniorage charges, labour
., complete for finished item of work, including the cost and conveyance of

3003.00

99.36
151.80
92.00
156.36
3502.52

1748.40
594.00
438.60
2781.00
6283.52
62.84
6346.36
864.06
7210.42
0.00
0.00
7210.42
721.04
Page 478 of 2191 data-Bld-18-19

mm thick Rough Cuddapah/ Shahbad stones, set over base coat of


C bed already laid or RCC roof slab, including pointing with cement mortar
of all materials like flooring stone, cement, sand, and water etc., complete,
harges for dressing of flooring stones etc., complete for finished item of
all materials.

1155.00

99.36
44.16
179.16
29.86
1507.54

541.44
1209.60
1683.00
3434.04
4941.58
672.8
5614.38
0.00
0.00
5614.38
561.44

cast terrazzo chequered tiles conforming to IS: 13801 Supplying


ming to IS:13801 using marble aggregates of size 10mm, sand, marble
terrazzo topping not less than 6 mm of tiles overall size not less than
ver base coat of cement mortar (1:6) 12 mm thick over CC bed already laid
slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed with
ment of matching shade including cost of all materials like cement, sand
eigniorage charges, complete for finished item of work, including the cost

2992.50
132.48
151.80
27.60
0.00
179.16
3483.54

518.40
1142.40
1683.00
3343.80
6827.34
Page 479 of 2191 data-Bld-18-19
68.27
6895.61
938.84
7834.45
0.00
0.00
7834.45
783.45

nary Soluble salt porcelain vitrified tiles screen printed and


thickness between 8-9 mm 1st quality conforming to IS:13711,
of any colour and finish in all shades and designs, set over base
over CC bed already laid or RCC roof slab, including neat cement slurry of
per sqm & jointed neatly with white cement paste to full depth mixed with
of all materials like cement, sand water and tiles etc., complete, including
shed item of work, including the cost and conveyance of all materials.

0.00

99.36
151.80
27.60
179.16
29.86
487.78

541.44
1209.60
1683.00
3434.04
3921.82
39.22
3961.04
539.3
4500.34
0.00
0.00
Page 480 of 2191 data-Bld-18-19
4500.34
450.03

ano polished /stain free soluble salt porcelain vitrified tiles screen
hickness between 8-10 mm 1st quality conforming to IS:13711,
ny colour and finish in all shades and designs, set over base coat of
C bed already laid or RCC roof slab, including neat cement slurry of honey
m & jointed neatly with white cement paste to full depth mixed with pigment
terials like cement, sand water and tiles etc. including seigniorage charges,
luding the cost and conveyance of all materials.

4420.50

99.36
151.80
27.60
179.16
29.86
4908.28

541.44
1209.60
1683.00
3434.04
8342.32
83.42
8425.74
1147.16
9572.90
0.00
0.00
9572.90
957.29
Page 481 of 2191 data-Bld-18-19

uble charged / multi charged stain free full body porcelain vitrified
ze 800 x 800 mm and thickness between 9-11 mm 1st quality
:13630 (Parts 1 to 15) of any colour and finish in all shades and
mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab,
consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement
matching shade, including cost of all materials like cement, sand water and
charges, etc., complete for finished item of work, including the cost and

6300.00

99.36
151.80
27.60
179.16
29.86
6787.78

541.44
1209.60
1683.00
3434.04
10221.82
102.22
10324.04
1405.62
11729.66
0.00
0.00
11729.66
1172.97
Page 482 of 2191 data-Bld-18-19

-skid red or white full body Ceramic floor tiles of size 300 x 300
m 1st quality conforming to IS:13711, IS:13712, IS:13630
ish in all shades and design, set over base coat of cement mortar (1:8),
r RCC roof slab, including neat cement slurry of honey like consistency
tly with white cement paste to full depth mixed with pigment of matching
ement, sand water and tiles etc., complete, including seigniorage charges,
uding the cost and conveyance of all materials.

3150.00
99.36
151.80
58.00
156.36
3615.52

541.44
1209.60
1683.00
3434.04
7049.56
70.5
7120.06
969.4
8089.46
0.00
0.00
8089.46
808.95
Page 483 of 2191 data-Bld-18-19
-skid red or white full body Ceramic floor tiles of scratch free-
inish of size 600 x 600 mm and thickness between 8-10 mm 1st
2, IS:13630 (Parts 1 to 15) of any colour and finish in all shades
ent mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab,
consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement
matching shade, including cost of all materials like cement, sand water and
charges, etc., complete for finished item of work,including the cost and

5092.50

99.36
151.80
58.00
156.36
5558.02

541.44
1209.60
1683.00
3434.04
8992.06
89.92
9081.98
1236.51
10318.49
0.00
0.00
10318.49
1031.85

Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than


base coat of cement mortar (1:8), 20 mm thick over CC bed already laid or
y of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with
f matching shade to full depth, including cost of all materials like cement,
ng seigniorage charges, labour charges for dressing of tilesetc., complete
and conveyance of all materials.
Page 484 of 2191 data-Bld-18-19
32739.00

165.60
151.80
174.00

260.60
33491.00

1692.00
540.00
4080.00
6312.00
39803.00
63.12
39866.12
5427.77
45293.89
0.00
0.00
45293.89
45293.89
4529.39
Page 485 of 2191 Earthing

Kodad Municipality
DATA BASED ON - 2018-2019 SSR
EARTH WORK EXCAVATION

1 BLD-CSTN-2-1 (9): Earth work excavation for foundations and depositing on bank for all lifts and with an
including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. co
item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).

Ordinary Soil-Manual Means-Upto 3 m out put 10.00 Cum


depth
a)  Labour
Mate (Labour -R&B-Second Class S.No-71) 0 day 500.00
Mazdoor (Labour -Irrigation-Unskilled-S.No.3) 3.64 day. 425.00
exclud-MA
Add Labour component @ 20%
Sub total
extra for foundations @ 75%
Sub - Total
c&d) Overheads & Contractors Profit 0.000%
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/10
Rate per 1 Cum excluding Dewatering
Page 486 of 2191 Earthing

Kodad Municipality
A BASED ON - 2018-2019 SSR

ion for foundations and depositing on bank for all lifts and with an initial lead of 10m
our charges such as shoring ,sheeting, planking, strutting, etc. complete for finished
uding dewatering charges etc as per SS - 20 B (APSS 308).

1 day 0.00
1 day. 1547.00
309.40
1856.40
0.00
1856.40
0
1856.40
185.64
Rs 185.64
Aluminium paint data

vi Painting with Aluminium paint Two


Coats - Old Iron Work : in all to give
an even shade after thourughly
brushing the surface to remove all
dirt and remains of loose powdered
BLD- materials, including cost and
CSTN-10- conveyance of all materials to work
10 site and all operational, incidental,
labour charges etc. complete for
finished item of work

Unit: 10 sqm
A. MATERIALS :
kg/Lt 2.100 258.00 541.8
B. LABOUR
Painter day 1.100 540.00 594
Add labour allowance @ 0.200 594.00 118.8
Sundries including brushes, soap, putty LS 1
etc.,
Total cost for 10 sqm 1255.6
Add overheads & contractor profit @ 13.615% 170.95
1426.55
Rate per one Sqm 142.66
Aluminium paint data

/sqm
drip irrigation data

DRIP IRRIGATION

S.NO
12b pH Lowering, Laying, jointing of PVC/HDPE/MDPE pipes as per BIS
SoR No.7634 part-III/75 for PVC and BIS No.7634 part-II/75 for
HDPE pipes including earth work excavation and testing to
1 hydralic test pressure including cost of water with a water lead
of 500m
etc., complete.including all material ,labour chaarges

25mm dia HDPE pipe Basic rate rmt

12mm dia HDPE pipe Basic rate rmt

Drip Irrigation Drip Emitters (quotation) each

Add overheads ,contractor profit @ 13.62%

Rate per one Rmt

ELEC- Supply, installation, testing and commissioning of 25mm dia each


2 10.7.39 Gate valve Makes : Zoloto / Leader / Approved makes

Add overheads ,contractor profit @ 13.62%

Rate per each one


drip irrigation data

DRIP IRRIGATION

37.00

18.00

350.00

405.00
55.14

460.14

1045.00

142.28

1187.28
491 of 2191 cc data

Sl.No Index-code Description Unit Quantity Rate Rs. Amount Rs.

1 2 3 4 5 6 7
1 RBR-EECD-5 Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with
initial lif of 3 mts and lead upto 50 m as per Technical Specification Clause 302.3 MORD

5 Unit = cum
Taking output = 120 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 46.800 510.00 23868.00

23868.00
Overheads & Contractors Profit 13.615% 3249.63
Cost of 120 cum 27117.63
Rate per cum = (a+b+c)/120 225.99

2 RBR-FNDN-2 Filling (Quarry Rubbish) in foundation trenches as per drawing and technical specification Clause
305.3.9 MORD & 304 MORTH

2-I Quarry Rubbish filling


Unit = cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 0.31 510.00 158.10
Add 20% Municipal area allowance on 31.62
labour charges
189.72
b) Material
Quarry Rubbish cum 6.00 127.26 763.56
953.28
Overheads & Contractors Profit 129.79
Rate per cum = a+b+c+d 1083.07
180.51 /Cum
II Sand Filling
Unit = cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 0.31 510.00 158.10
Add 20% Municipal area allowance on 31.62
labour charges
189.72
b) Material
Sand filling cum 6.00 1303.00 7818.00
8007.72
c&d) Overheads & Contractors Profit 1090.25
Rate per cum = a+b+c+d 9097.98
1516.33 /Cum

3 III Gravel filling in foundation trenches as per the drawing and technical specification clause 305.3.9
MORD & 304 MORTH
Unit = cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 0.31 510.00 158.10
492 of 2191 cc data

Add 20% Municipal area allowance on


labour charges
158.10
b) Material
Gravel cum 6.00 148.26 889.56
1047.66
Overheads & Contractors Profit 142.64
Rate per cum = a+b+c+d 1190.30
/Cum 198.38
RBR-EECD- Removal of unsuitable / Unserviceable soil including excavation,
7(Ch 3) loading and disposal upto 1000 m lead including compaction upto
OMC , ground supporting embankment subgrade replacement by
suitable soil as per Clause 303.5.2 as per Technical Specification
Clause 302.3.11 MORD / 301 MORTH and directed by Engineer-in-
Charge
Unit = cum
Taking output = 360 cum
a)  Labour
Mate day -
Mazdoor (Unskilled) day 2.080 510 1060.80
b) Machinery
Excavator 0.90 cum bucket hour 3.60 2967.9 10684.44
capacity @ 100 cum per hour
Tipper 5.5 cum capacity, 4 trips hour 15.00 1004.4 15066.00
per hour
26811.24
c&d) Overheads & Contractors Profit 13.62% 3650.35
Cost for 360 cum = a+b+c+d 30461.59
Rate per cum = (a+b+c+d)/360 84.62

RBR-FNDN-2 Supply and filling with HBG chips 2.36mm and below from approved quarry including cost
and conveyance, watering, tamping including all labour charges

Quarry dust
Unit = cum
Taking output = 6 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 0.31 510.00 158.10

b) Materials Cum 6.00 774.95 4649.7


4807.8
Overheads & Contractors Profit @ 13.615% 654.59
Cost for 6 cum = a+b+c Total 5462.39
Rate per cum = (a+b+c) 910.40

Total 910.400
Rs.910.4/1 cum
493 of 2191 cc data

SNO 238 R&B Polythene sheet 125 micron sno sqm 1 17


152 R&B
Add CP 13.615% 2.31
19.31
Supply and laying of expansion joints with 25.4mm thick
Mastic pad, sealing with bituminous hot sealing compound
(Grade 'A' ISI Polysnlphider) including cost and conveyance
of all materials such as filler materials etc complete.
sqm 1 1022.0 1022.0
Overheads & Contractors Profit @ 13.615% 139.15
1161.2

Providing Plain Cement Concrete (1:4:8) mix using 20mm size


HBG crushed stone aggregate and fine aggregate conforming to
table 1000-2 of MoRT&H including cost, conveyance of all
materials to site and labour charges, centering, machine mixing,
laying, Vibrating, curing etc., including all other incidental and
operational charges of all T&P etc., complete for finished item of
BLD-CSTN-2-7work as per MoRT&H specification 1500, 1700, 2100 (5th
Revision) and as directed by the Engineer-in-Charge for base
coarse below CC Pavement.

Cement kg 162.00 4.60 745.20


Coarse aggregate 20 mm cum 0.90 1256.20 1130.58
Fine aggregate (Sand) cum 0.45 1303.00 586.35
Seigniorage charges for C.A cum 0.90 0.00 0.00
Seigniorage charges for F.A cum 0.45 0.00 0.00
Water (including for curing) kl 1.20 98.00 117.60
B. MACHINERY 2579.73
Concrete Mixer 10 / 7 cft (0.2 / 0.8 hour 1.00 397.50 397.50
cum)
labourcapacity
allowance on crew charges hour 1.00 247.00 49.40
446.90
C. LABOUR:
Mason 1st class day 0.10 600.00 60.00
Mazdoor (unskilled) day 1.39 510.00 708.90
768.90
Sub Total 3795.53
Overheads & Contractors Profit @ 13.615% 516.76
4262.89
4262.89
495 of 2191 CL data

KODADA MUNICIPALITY

Data for providing Central double arm Lighting system with 12.0 mts hot-dip galvanized Octogonal
with 180 W LED luminaries

Sl.No SSR No Description of Item Qty Rate


input
No of Poles 1 nos
1.50 mtrs sword type decorative double arm bracket cable 16 1 mtrs
sqmm 4 core

P V C insulated cable 4.0 Sqmm (56/0.3) 3 Core 1 mtrs

Armoured alluminium cable length 1 mtrs

1 ELEC-7.2.1 Fabrication, Transportation and supply of hot-dip galvanized


Octogonal Pole with BSEN - 10025 grade S 355 JO steel plate for
shaft, IS 2062 for base plate with door opening arrangement,
including the supply of suitable boards with bakelite sheet and
MCB's as per IS specification suitable to withstand the wind speed
of 180 KMPH for 12 Mtrs height Pole having dimensions Bottom
200mm, Top 90mm with 4mm thick, base plate 320 x320 x20mm
and 4 Nos of M24 x850mm long 'J' bolts along with template

1 26877.0
9 Add over heads & contractor profit @ 13.615%
Total Rs
2 ELEC-7.3.7 Fabrication, Transportation and supply of 1.5mtrs
decorative galvanized Single arm bracket with PU paint complete
with all accessories with MS galvanized 50mm dia Pipe.

1 3885.0
9 Add over heads & contractor profit @ 13.615%
Total Rs
Fabrication, Transportation and supply of of 1.5 Mtr sword type or
any decorative double arm bracket with doomscomplete with all
accessories with MS galvanized 50mm dia Pipe.
1 5060.0
Add over heads & contractor profit @ 13.615%
Total Rs
496 of 2191 CL data

3 ELEC- Foundation and erection charges with special T&P, for 12Mtrs long
7.10.3 Octagonal / Conical pole duly erecting on base plate duly providing
4 Nos foundation bolts with nuts with providing of
0.67Mtrx0.67Mtrsx1.50 Mtr size M20 cc work vibrated concreting
mixing with necessary steel (20kgs) reinforcement as directed by
the field engineers during execution including all labour charges
and cost and conveyance of materials etc. complete.

1 7875.0
9 Add over heads & contractor profit @ 13.615%
Total Rs
3 ELEC- ELEC-4.1.10 : Supply of 10 Sqmm 4 Core XLPE insulated, 1100V
4.1.10 grade armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) of Makes : RPG / Finolex / Paragon / V-Guard /
Fortune Art / Suncab / Finecab / Gemscab / Payal.

1 140.0
Add over heads & contractor profit @ 13.615%
Total Rs
5 ELEC-4.1.1 Supply of 16 Sqmm 4 Core XLPE insulated, 1100V grade armoured
alluminium cable as per specification confirming to IS:7098 (Part -
I). Makes : Torrent / Universal / Unicab / Polycab / Havells / Gloster
/ KEI or equivalent

1 154
Add over heads & contractor profit @ 13.615%
Total Rs
5 ELEC-4.8.1 ELEC-4.8.1 : Supply and Transportation of Outer dia 63mm and
Inner dia 51mm double walled corrugated HDPE duct made as per
specification BSEN - 500 86/IS 14930 Part-II. Makes:DURA LINE
(Dura Guard) or its equivalent make.

1 117
Add over heads & contractor profit @ 13.615%
Total Rs
5 ELEC-1.6.4 ELEC-1.6.4 :Supply of 3 Core x 2.5 Sqmm FRLS armoured copper
cable as per IS. 7098 / Part-I / 1988 including all taxes etc.,
complete of make Universal/ CCI /Unicab/Polycab / Finolex / KEI /
Havells.

1 85.63
Add over heads & contractor profit @ 13.615%
Total Rs
497 of 2191 CL data

5 ELEC-4.4.1 ELEC-4.4.1 : Supply and fixing of crimping type copper lugs


confirming to I.S specifications for cable upto 16 Sq.mm including
nuts and bolts with connections

1 20
Add over heads & contractor profit @ 13.615%
Total Rs
5 ELEC-4.3.5 ELEC-4.3.5 : Supply and Fixing of double compression brass
cable glands for 4 core XLPE armoured cable up to 16.0 Sq.mm
with brass washers complete.

1 10
Add over heads & contractor profit @ 13.615%
Total Rs
5 TBSP-G.I- ELEC-9.1.56 : Supply and laying of 40mm Nominal Bore medium
11 grade G.I.Pipe including cost and conveyance etc, complete.

1 420
Add over heads & contractor profit @ 13.615%
Total Rs
5 ELEC-3.5.1 ELEC-3.5.1: Supply & Installtion of 25KW Automatic Street Light
Control System with Optical Sensor, Low volatage / High voltage
trip and reset, operating voltage 150 - 280V AC, 50 HZ with
suitable SMC enclousure of IP 54 protection, MCBs and contactor
suitable to control the load of 3 KW of single phase load with
necessary clamping arrangements. Makes : Swadeep Nature
Switch / Light Mate.

1 28000
Add over heads & contractor profit @ 13.615%
Total Rs
498 of 2191 CL data

5 ELEC-5.1.1 Supply and installation of advanced lighting protection with 205


-580mm height and 4.60 - 4.940 kgs, and having Rod length
760mm,weight 1.795 kgs with stainless steel rod, working on the
principle of (ESE) Early Streamer Emission technology, having a
coverage radius of 79 Mts under level 1 protection and 107 Mtrs
radius under
level 4 protection when mounted on 5 - 15 mts height of existing
lattice tower giving level 1 protection and anticipation emission time
of 60 - 72 micro seconds. The ESE should be manufactured
according to standard NFC 17-102 : 2011 and CE certified
including functional integrity etc Complete. Make : EARTHPLUS
(THUNDER
GUARD) / NIMBUS / KALRE / FOREND.

1 113778
Add over heads & contractor profit @ 13.615%
Total Rs
4 ELEC- Supply and transportation of ......... LED Street light Body made of
3.11.1 high grade pressure die – cast Aluminium alloy with corrosion
resistant powder coat, having protective toughened glass cover,
Less Glare, IP 66 (Silicon gasket ensures Optical & Electrical
compartments are IP 66) protected, wide operating voltage range,
P.F > 0.90, System having efficacy >100 lumens/watt, with Ingress
protection IP66, Driver surge protection more than 4KV,
THD<15%, CCT: 3000- 6500K as desired by the department and as
per IS, CRI>80, Inbuilt Electrical protections like Over voltage,
short circuit, Over load, Open Circuit, Miswiring, etc complete with
5 years warranty .LUMINAIRE MAKE : PHILIPS / OSRAM / GE /
CROMPTON / BAJAJ / SCHREDER / VIN / HALONIX /HAVELLS / HPL
/ SURYA / SYSKA. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA
/ OSRAM / SAMSUNG / LG LEDs.

90 W 1 10562.0
9 Add over heads & contractor profit @ 13.615%
Total Rs

120 W 1 12884.0
Add over heads & contractor profit @ 13.615%
Total Rs
180 W 1 17229.0
Add over heads & contractor profit @ 13.615%
Total Rs
4 ELEC-2.9.1 Supply of 6-32 V, 10KA, SP MCB C/D Curve ISI Mark.
Makes : Legrand-DX3 / Schneider-Acti9 / Siemens / L&T Exora /
Cabtree.

6-23CB MCB 1 193.0


499 of 2191 CL data

Add over heads & contractor profit @ 13.615%


Total Rs
4 ELEC-2.9.1 Supply of 63A 4 Way Connector

6-23CB MCB 1 193.0


Add over heads & contractor profit @ 13.615%
Total Rs
4 ELEC-2.9.1 Supply and Run of No.8 SWG G.1 wire including cost of all
accessories
and labour charges etc., complete.

6-23CB MCB 1 193.0


Add over heads & contractor profit @ 13.615%
Total Rs
6 ELEC-7.5.2 Supply and fixing of suitable out door feeder piller box of size made
b with 14 SWG CRCA sheet with double door arrangement, making
powder coating after processing of 7 Tank process, lock and key,
hinges, rubber gasket, danger board,suitable angle iron stand for
mounting the feeder pillar with cement concrete, including Supply
and fixing of Legrand / Schnieder make 40 A-63A, 4 pole MCB As
incomer,6-32A SP MCB 6 no. as out goings, indication lamps, din
channel, 6 Sqmm 3 core copper cable for invidual light control,
connectors, gland plates and provision for 3 phase energy meter
etc., complete for finished item of
work and suitable wiring provision for connecting the nature switch
with following. 40A-63A, 4pole MCB as incomer,
6no.s6-32A SPMCB as outgoings.

1.00 17659.0
9 Add over heads & contractor profit @ 13.615%
Total Rs
13.5.1 Supply and fixing of 300mm x 260mm x 140mm No.16 gauge
BLD-ELEC-13-5

CRCA sheet box with hinged door and locking arrangements and
din channel for fixing 2Nos MCBs duly powder coated with
matching colour of poles including fixing with necessary
arrangments etc., complete.
a) Material
300x260x140mm 16 guage CRCA box finished of item (as per sqm 0.35
14.1.2)
MCB No 2.00
Sundries as rounding off
Sub total
add for over heads @ 13.615%
Sub Total
500 of 2191 CL data

8 ELEC-1.5.8 Supply of 4.0 Sqmm (56/0.3) 3 Core PVC Insulated and FRLS
Round Sheathed Multi Core Bright Annealed Bare Copper Conductor
Heavy Duty Industrial Cables for Voltage Grade upto 1100 Volts as
per IS: 694:1990 including all transportation charges etc complete.
Makes : Finolex / RR kabel / Havells / Polycab / RPG / KEI / Nakoda
/ Sun cab / Sudhakar / Powerflex/Gemni

4.0 Sqmm (56/0.3) 3 Core 1 132

9 Add over heads & contractor profit @ 13.615%


Total Rs.

8 ELEC-1.5.8 Laying of 63mm and Inner dia 51 mm double walled


corrugated HDPE as directed by the department including
cost and conveyance of all materials and labour charges etc.,
complete.

laying charges as per karnataka ssr 1 47


501 of 2191 CL data

KODADA MUNICIPALITY

ighting system with 12.0 mts hot-dip galvanized Octogonal Pole


with 180 W LED luminaries

per Amount

each 26877.00
3659.3
30536.30

each 3885.00
528.94
4413.94

each 5060.00
688.92
5748.92
502 of 2191 CL data

each 7875.00
1072.18
8947.18

mt 140.00
19.06
159.06

rmt 154.00
20.97
174.97

rmt 117.00
15.93
132.93

rmt 85.63
11.66
97.29
503 of 2191 CL data

Each 20.00
2.72
22.72

Each 10.00
1.36
11.36

mt 420.00
57.18
477.18

No 28000.00
3812.2
31812.20
504 of 2191 CL data

No 113778.00
15490.87
129268.87

each 10562.00
1438.02
12000.02

each 12884.00
1754.16
14638.16
each 17229.00
2345.73
19574.73

each 193.00
505 of 2191 CL data

26.28
219.28

each 193.00
26.28
219.28

each 193.00
26.28
219.28

each 17659.00
2404.27
20063.27

5753.81 2013.83

512.00 1024.00
200
3237.83
440.83
3678.66
506 of 2191 CL data

rmt 132.00

17.97
149.97
0.0014997

15.0015

rmt 47.00
Standard Data - Electrical Items For Buildings
Inde
x- Spe No. Description Unit Qty Rate Rs. Per
code

BLD- 1 Conduit Laying


ELE
C-1
1 MS / PVC / Trunks Coduit Laying
BLD-ELEC-1-1.1

1.1 M.S.CONDUIT (Surface)


1.1.1 Supply and Fixing of 20mm dia 16 SWG (ISI Mark) MS Surface conduit pipe duly threading at Joi
required accessories fixing on T.W. Separators with chromium plated base saddles and No.18 SWG M
light, fan and separate plug points including cost of Cement, all materials, accessories and all labour ch
complete.
Taking Output = 100 M 100 m
a) Material
ELEC-1.1.1 20mm dia 16 SWG MS conduit , 100 M 100 m 99.00 1

ELEC-9.1.1 T.W seperators, 100 Nos 200 Nos 165.00 100

ELEC-1.4.22 30mm Screws No.8, 100 Nos 200 Nos 89.00 100

ELEC-9.1.2 Rawal Plugs, 100 Nos 200 Nos 28.00 100

ELEC-1.4.20 12mm Screws, 100 Nos 400 Nos 59.00 100

ELEC-1.1.34 20mm Saddles MS, 100 Nos 200 Nos 211.00 100

ELEC-1.1.6 20mm 1,2,3 & 4 way Junction box, Dozen 12 Nos 27.00 1

ELEC-1.1.14 20mm dia HG bends, Dozen 12 Nos 23.40 1

ELEC-1.4.12 200mm x 250mm sheet metal deep box, Each 3 No 73.00 1

Cement (As per civil SSR) kg 12.5 Kg 4.60 1


b) Labour charges :
Skilled Electrician day 3 day 648.00 1
Semi skilled Electrician day 3 day 540.00 1
Helpers day 3 day 540.00 1
Sundries
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = Total/100
BLD-ELEC-1-1.2

1.1.2 Supply and Fixing of 25mm dia 16 SWG (ISI MARK) MS Surface pipe duly threading at Joints with
accessories fixing on T.W. Seperators with chromium plated base saddles and No.18 SWG MS box for ru
including cost of Cement, all materials, accessories and all labour charges etc., complete.

Taking Output = 100 M 100 m


a) Material
ELEC-1.1.2 25mm dia 16 SWG MS conduit, 100 M 100 m 126.75 1

ELEC-8.1.8 T.W seperators, 100 Nos 150 Nos 165.00 100


ELEC-1.4.23 38mm Screws No.8, 100 Nos 150 Nos 96.00 100

ELEC-8.1.9 Rawal Plugs, 100 Nos 150 Nos 28.00 100


ELEC-1.4.34 12mm Screws, 100 Nos 300 Nos 59.00 100
ELEC-1.1.35 25mm Saddles MS, 100 Nos 150 Nos 220.00 100

ELEC-1.1.7 25mm 1,2,3 & 4 way Junction box, Dozen 6.00 Nos 28.80 1

ELEC-1.1.15 25mm dia HG bends, Dozen 12.00 Nos 25.80 1

Cement (As per civil SSR) kg 12.50 Kg 4.60 1


b) Labour charges :
Skilled Electrician day 3.00 day 648.00 1
Semi skilled Electrician day 3.00 day 540.00 1
Helpers day 3.00 day 540.00 1
Sundries
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = Total/100
BLD-ELEC-1-1.3

1.1.3 Supply and Fixing of 32mm dia 16 SWG (ISI MARK) MS Surface pipe duly threading at Joints with
accessories fixing on T.W. Seperators with chromium plated base saddles and No.18 SWG MS box for ru
including cost of Cement, all materials, accessories and all labour charges etc., complete.

Unit = 1Metre
Taking Output = 100 M 100 m
a) Material
ELEC-1.1.3 32mm dia 16 SWG MS conduit, 100 M 100 m 178.50 1
ELEC-8.1.8 T.W seperators, 100 Nos 150 Nos 165.00 100
ELEC-1.4.37 38mm Screws No.8, 100 Nos 150 Nos 96.00 100
ELEC-8.1.9 Rawal Plugs, 100 Nos 150 Nos 28.00 100
ELEC-1.4.34 12mm Screws, 100 Nos 300 Nos 59.00 100
ELEC-1.1.41 32mm Saddles MS, 100 Nos 150 Nos 244.00 100

ELEC-1.2.35 32mm 1,2,3 & 4 way Junction box, Dozen 6 Nos 26.00 12
ELEC-1.1.16 32mm dia HG bends, Dozen 12 Nos 58.00 12
Cement (As per civil SSR) kg 12.5 Kg 4.60 1
b) Labour charges :
Skilled Electrician day 3.00 day 648.00 1
Semi skilled Electrician day 3.00 day 540.00 1
Helpers day 3.00 day 540.00 1
Sundries
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = Total/100
BLD-ELEC-1-2.1

1.2 MS Conduit Concealed


1.2.1 Supply and Fixing of 20mm dia 16 SWG (ISI Mark) MS concealed conduit, duly threadig at Joints, o
required accessories including chiselling the wall for light, Fan and separate plug point including neces
metal deep boxes, masonsary work and all labour charges etc. complete.
Taking Output = 100 M 100 m
a) Material
ELEC-1.1.1 20mm dia 16 SWG MS conduit pipe, 100 M 100 m 99.00 1
ELEC-9.1.3 U' Nails, 100 Nos 200 Nos 44.00 100
ELEC-1.1.11 200mm x 250mm sheet metal deep box, Each 3 Nos 71.00 1
ELEC-1.1.14 20mm dia HG bends, Dozen 12 Nos 23.40 1
Cement kg 12.5 Kg 4.60 1
b) Labour charges :
Skilled Electrician day 3 day 648.00 1
Semi skilled Electrician day 3 day 540.00 1
Helpers day 3 day 540.00 1
Mason Ist class day 3 day 564.00 1
Sundries
C) Cost for 100 RM
add for over heads @ 13.62%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = Total/100
BLD-ELEC-1-2.2

1.2.2 Supply and Fixing of 25mm dia 16 SWG (ISI MARK) MS concealed conduit, duly threadig at Joints in S
wall with required accessories including chiselling the wall and necessary Masonary and all labour ch
complete for run of mains.

Taking Output = 100 M 100 m


a) Material
ELEC-1.1.2 25mm dia 16 SWG MS conduit, 100 M 100 m 126.75 1

ELEC-8.1.10 U' Nails, 100 Nos 200 Nos 44.00 100


ELEC-1.1.11 25 mm Deep Junction Box, Dozen 12 Nos 71.00 1
ELEC-1.1.15 25mm HG bends, Dozen 12 Nos 25.80 1
Cement kg 50 Kg 4.60 1
b) Labour charges :
Skilled Electrician day 3 day 648.00 1
Semi skilled Electrician day 3 day 540.00 1
Helpers day 3 day 540.00 1
Mason Ist class day 3 day 564.00 1
Sundries
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = Total/100
1.2.3 Supply and Fixing of 32mm dia 16 SWG (ISI
Mark) MS concealed conduit, duly threadig
BLD-ELEC-1-2.3

at Joints in Slab and on wall with required


accessories including chiselling the wall and
necessary Masonary and all labour charges
etc. complete for run of mains.

Taking Output = 100 M 100 m


a) Material
ELEC-1.1.3 32mm dia 16 SWG MS conduit pipe, 100 M 100 m 178.50 1

ELEC-9.1.3 U' Nails, 100 Nos 200 Nos 44.00 100

ELEC-1.1.12 32 mm Deep Junction Box, Dozen 12 Nos 124.00 1

ELEC-1.1.16 32mm dia HG bends, Dozen 12 Nos 58.00 1

Cement kg 50 Kg 4.60 1
b) Labour charges :
Skilled Electrician day 3 day 648.00 1
Semi skilled Electrician day 3 day 540.00 1
Helpers day 3 day 540.00 1
Mason Ist class day 3 day 564.00 1
Sundries
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
NOTE : For Laying MS Concealed Conduit
pipe in roof Slab, deduct the Cost of Cement
and U' Nails.
1.3 P.V.C. Conduit (Surface)
1.3.1 Supply and Fixing of 20mm dia 1.5mm thick
BLD-ELEC-1-3-1

surface P.V.C. pipe (ISI MARK) with all


accessories fixing on chromium plated
metallic base saddles and decolam board for
switches for Light, Fan and separate plug
point including all labour charges etc.,
complete.

Taking Output = 100 M 100 m


a) Material
ELEC-1.2.1 20mm dia 1.5mm thick PVC pipe, 100 M 100 m 19.10 1

ELEC-8.1.9 Rawal Plugs, 100 Nos 200 Nos 28.00 100


ELEC-1.4.37 35mm Screws No.8, 100 Nos 200 Nos 96.00 100
ELEC-1.1.34 Chromium Plated saddles with base, Each 200 Nos 211.00 100

ELEC-1.2.26 20mm 1,2,3 & 4 way Junction box, Each 12 Nos 17.00 1

ELEC-1.2.36 20mm PVC Bends, Each 12 Nos 4.00 1

ELEC-1.3.11 8" x10" Decolam Board, Each 3 Nos 184.00 1

Cement kg 25 Kg 4.60 1
b) Labour charges :
Skilled Electrician day 2 day 648.00 1
Semi skilled Electrician day 2 day 540.00 1
Helpers day 2 day 540.00 1
Sundries
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
1.3.2 Supply and Fixing of 25mm dia 1.5mm thick
BLD-ELEC-1-3-2

surface P.V.C. pipe (ISI MARK) with all


accessories fixing on chromium plated
metallic base saddles including all labour
charges etc., complete for run of mains.
Taking Output = 100 M 100 m
a) Material
ELEC-1.2.3 25mm dia 1.8mm thick PVC pipe, 100 M 100 m 25.40 1

ELEC-8.1.9 Rawal Plugs, 100 Nos 200 Nos 28.00 100


ELEC-1.4.37 35mm Screws No.8, 100 Nos 200 Nos 96.00 100
ELEC-1.1.34 Chromium Plated saddles with base, Each 200 Nos 211.00 100
ELEC-1.2.27 25mm 1,2,3, & 4 way Junction boxes, Each 12 Nos 19.00 1

ELEC-1.2.37 25mm PVC Bends, Each 12 Nos 6.00 1

Cement kg 25 Kg 4.60 1
b) Labour charges :
Skilled Electrician day 2 day 648.00 1
Semi skilled Electrician day 2 day 540.00 1
Helpers day 2 day 540.00 1
Sundries
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
1.3.3 Supply and Fixing of 32mm dia 2.5mm thick
BLD-ELEC-1-3-3

surface P.V.C. pipe (ISI Mark) with all


accessories fixing on chromium plated
metallic base saddles including all labour
charges etc., complete for run of mains
Taking Output = 100 M 100 m
a) Material
ELEC-1.2.12 32mm dia 2.5mm thick PVC pipe, 100 M 100 m 36.90 1

ELEC-8.1.9 Rawal Plugs, 100 Nos 200 Nos 28.00 100


ELEC-1.4.37 35mm Screws No.8, 100 Nos 200 Nos 96.00 100
ELEC-1.1.36 Chromium Plated saddles with base, Each 200 Nos 409.50 100

ELEC-1.2.28 32mm 1,2,3, & 4 way Junction boxes, Each 12 Nos 34.00 1

ELEC-1.2.38 32mm PVC Bends, Each 12 Nos 16.00 1

Cement kg 25 Kg 4.60 1
b) Labour charges :
Skilled Electrician day 2 day 648.00 1
Semi skilled Electrician day 2 day 540.00 1
Helpers day 2 day 540.00 1
Sundries
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
1.3.4 Supply and Fixing of 40mm dia 2.5mm thick
BLD-ELEC-1-3-4

surface P.V.C. pipe (ISI MARK) with all


accessories fixing on chromium plated
metallic base saddles including all labour
charges etc., complete for run of mains.
Taking Output = 100 M 100 m
a) Material
ELEC-1.2.5 40mm dia 2.5mm thick PVC pipe, 100 M 100 m 42.50 1

ELEC-8.1.9 Rawal Plugs, 100 Nos 200 Nos 28.00 100


ELEC-1.4.37 35mm Screws No.8, 100 Nos 200 Nos 96.00 100
ELEC-1.1.37 Chromium Plated saddles with base, Each 200 Nos 705.00 100
ELEC-1.2.29 40mm 1,2,3, & 4 way Junction boxes, Each 12 Nos 37.00 1

ELEC-1.2.39 40mm PVC Bends, Each 12 Nos 19.00 1

Cement kg 25 Kg 4.60 1
b) Labour charges :
Skilled Electrician day 2 day 648.00 1
Semi skilled Electrician day 2 day 540.00 1
Helpers day 2 day 540.00 1
Sundries
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
1.3.5 Supply and Fixing of 50mm dia 2.5mm thick
BLD-ELEC-1-3-5

surface P.V.C. pipe (ISI MARK) with all


accessories fixing on chromium plated
metallic base saddles including all labour
charges etc., complete for run of mains.
Taking Output = 100 M 100 m
a) Material
ELEC-1.2.7 50mm dia 2.5mm thick PVC pipe, 100 M 100 m 81.40 1

ELEC-8.1.9 Rawal Plugs, 100 Nos 200 Nos 28.00 100


ELEC-1.4.37 35mm Screws No.8, 100 Nos 200 Nos 96.00 100
ELEC-1.1.38 Chromium Plated saddles with base, Each 200 Nos 892.50 100

ELEC-1.2.30 50mm 1,2,3, & 4 way Junction boxes, Each 12 Nos 51.00 1

ELEC-1.2.40 50mm PVC Bends, Each 12 Nos 28.00 1

Cement kg 25 Kg 4.60 1
b) Labour charges :
Skilled Electrician day 2 day 648.00 1
Semi skilled Electrician day 2 day 540.00 1
Helpers day 2 day 540.00 1
Sundries
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
1.4 P.V.C. Conduit (Concealed)
1.4.1 (a) Supply and Fixing of 20mm dia 2mm thick
BLD-ELEC-1-4-1a

P.V.C. pipe (ISI MARK) concealed in wall


with all required accessories including
masonary work for light, fan and separate
plug point with well seasoned wooden deep
box including all labour charges etc.,
complete.

Taking Output = 100 M 100 m


a) Material
ELEC-1.2.2 20mm dia 2.1mm thick PVC pipe, 100 M 100 m 24.20 1

ELEC-8.1.10 U' Links, 100 Nos 200 Nos 44.00 100


ELEC-1.4.12 10" x 8" Wooden deep box, Each 3 Nos 73.00 1

ELEC-1.2.31 20mm dia 1,2,3 & 4 way deep Junction Box, Each 12 Nos 22.00 1

ELEC-1.2.36 20mm PVC Bends, Each 12 Nos 4.00 1

Cement kg 50 Kg 4.60 1
b) Labour charges :
Skilled Electrician day 2 day 648.00 1
Semi skilled Electrician day 2 day 540.00 1
Helpers day 2 day 540.00 1
Mason Ist class day 2 day 564.00 1
Sundries
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
(b) Supply and Fixing of 20mm dia 1.5mm thick
P.V.C. pipe (ISI MARK) concealed in wall
BLD-ELEC-1-4-1b

with all required accessories including


masonary work for light, fan and separate
plug point with well seasoned wooden deep
box including all labour charges etc.,
complete.

Taking Output = 100 M 100 m


a) Material
ELEC-1.2.1 20mm dia 1.5mm thick PVC pipe, 100 M 100 m 19.10 1

ELEC-8.1.10 U' Links, 100 Nos 200 Nos 44.00 100


ELEC-1.4.12 10" x 8" Wooden deep box, Each 3 Nos 73.00 1
ELEC-1.2.33 20mm dia 1,2,3 & 4 way deep Junction Box, Each 12 Nos 22.00 1

ELEC-1.2.43 20mm PVC Bends, Each 12 Nos 4.00 1


Cement kg 50 Kg 4.60 1
b) Labour charges :
Skilled Electrician day 2 day 648.00 1
Semi skilled Electrician day 2 day 540.00 1
Helpers day 2 day 540.00 1
Mason Ist class day 2 day 564.00 1
Sundries
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
BLD-ELEC-1-4-2A

1.4.2 (a) Supply and Fixing of 25mm dia 2mm thick


PVC pipe (ISI MARK) concealed in wall with
all required accessories including masonary
work and labour charges etc., complete.

Taking Output = 100 M 100 m


a) Material
ELEC-1.2.4 25mm dia 2.2mm thick PVC pipe, 100 M 100 m 31.80 1
ELEC-8.1.10 U' Links, 100 Nos 200 Nos 44.00 100
ELEC-1.2.32 25mm 1,2,3, & 4 way Junction boxes, Each 12 Nos 25.00 1

ELEC-1.2.37 25mm PVC Bends, Each 12 Nos 6.00 1

Cement kg 50 Kg 4.60 1
b) Labour charges :
Skilled Electrician day 2 day 648.00 1
Semi skilled Electrician day 2 day 540.00 1
Helpers day 2 day 540.00 1
Mason Ist class day 2 day 564.00 1
Sundries
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
BLD-ELEC-1-4-2B

(b) Supply and Fixing of 25mm dia 1.5mm thick


PVC pipe (ISI MARK) concealed in wall with
all required accessories including masonary
work and labour charges etc., complete.

Taking Output = 100 M 100 m


a) Material
ELEC-1.2.3 25mm dia 1.5mm thick PVC pipe, 100 M 100 m 25.40 1

ELEC-8.1.10 U' Links, 100 Nos 200 Nos 44.00 100


ELEC-1.2.34 25mm 1,2,3, & 4 way Junction boxes, Each 12 Nos 25.00 1
ELEC-1.2.44 25mm PVC Bends, Each 12 Nos 6.00 1
Cement kg 50 Kg 4.60 1
b) Labour charges :
Skilled Electrician day 2 day 648.00 1
Semi skilled Electrician day 2 day 540.00 1
Helpers day 2 day 540.00 1
Mason Ist class day 2 day 564.00 1
Sundries
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
BLD-ELEC-1-4-2C

1-4-2C Supply and Fixing of 25mm dia 2mm thick


PVC pipe (ISI MARK) concealed in Roof
Slabs with all required accessories including
masonary work and labour charges etc.,
complete.
Taking Output = 100 M 100 m
a) Material
ELEC-1.2.4 25mm dia 2mm thick PVC pipe, 100 M 100 m 31.80 1

ELEC-1.2.32 25mm dia 1,2,3 & 4 way deep Junction Box, Each 12 Nos 25.00 100

ELEC-1.2.44 25mm PVC Bends, Each 12 Nos 6.00 1


b) Labour charges :
Skilled Electrician day 2 day 648.00 1
Semi skilled Electrician day 2 day 540.00 1
Helpers day 2 day 540.00 1
Sundries
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
Note : 1. If 25mm dia PVC / MS pipes are
used for light / fan point, add the cost of
sheet metal / well seasoned wooden board /
box.
1.5 P.V.C. Casing and Caping
1.5.1 Supply and Laying of P.V.C casing and
BLD-ELEC-1-5-1

caping (ISI MARK) with double locking


arrangments with groover trunking of size
not below 12.5mm height 19/20mm size with
all accessories, duly sealed at points and
erected on Wall / Ceiling including cost of all
materials and labour charges complete.

Taking Output = 100 M 100 m


a) Material
ELEC-1.2.10 19mm / 20mm x 12.5 mm height Casing and 100 M 100 m 25.40 1
Caping,
b) Labour charges :
Skilled Electrician day 1 day 648.00 1
Semi skilled Electrician day 1 day 540.00 1
Helpers day 2 day 540.00 1
Sundries such as screws, Rawal Plugs, LS
Gutting, Cement, Sand and Rounding off.
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
1.5.2 Supply and Laying of P.V.C casing and
caping (ISI MARK) with double locking
BLD-ELEC-1-5-2

arrangments with groover trunking of size


not below 12.5mm height 25mm size with all
accessories, duly sealed at points and
erected on Wall / Ceiling including cost of all
materials and labour charges complete.

Taking Output = 100 M 100 m


a) Material
ELEC-1.2.11 25mm x 12.5 mm height Casing and Caping, 100 M 100 m 31.80 1

b) Labour charges :
Skilled Electrician day 1 day 648.00 1
Semi skilled Electrician day 1 day 540.00 1
Helpers day 2 day 540.00 1
Sundries such as screws, Rawal Plugs, LS
Gutting, Cement, Sand and Rounding off.
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
1.5.3 Supply and Laying of P.V.C casing and
caping (ISI MARK) with double locking
BLD-ELEC-1-5-3

arrangments with groover trunking of size


not below 12.5mm height 31/32mm size with
all accessories, duly sealed at points and
erected on Wall / Ceiling including cost of all
materials and labour charges complete.

Taking Output = 100 M 100 m


a) Material
ELEC-1.2.12 30 / 32mm x 12.5 mm height Casing and 100 M 100 m 36.90 1
Caping,
b) Labour charges :
Skilled Electrician day 1 day 648.00 1
Semi skilled Electrician day 1 day 540.00 1
Helpers day 2 day 540.00 1
Sundries such as screws, Rawal Plugs, LS
Gutting, Cement, Sand and Rounding off.
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
1.5.4 Supply and Laying of P.V.C casing and
caping (ISI MARK) with double locking
BLD-ELEC-1-5-3

arrangments with groover trunking of size


not below 12.5mm height 38/40 size with all
accessories, duly sealed at points and
erected on Wall / Ceiling including cost of all
materials and labour charges complete.

Taking Output = 100 M 100 m


a) Material
ELEC-1.2.13 38 / 40mm x 12.5 mm height Casing and 100 M 100 m 63.50 1
Caping,
b) Labour charges :
Skilled Electrician day 1 day 648.00 1
Semi skilled Electrician day 1 day 540.00 1
Helpers day 2 day 540.00 1
Sundries such as screws, Rawal Plugs, LS
Gutting, Cement, Sand and Rounding off.
C) Cost for 6 Points
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
2 Wiring - (BLD-ELEC-2 )
2.1 Copper Wiring
2.1.1 Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm)
Fire Retardant (FR) P.V.C. insulated flexible
BLD-ELEC-2-1-1

copper cable (ISI MARK) in existing pipe


with 6A switch, Ceiling rose and 3mm thick
hylam sheet covering to switch control box
including all labour charges etc., complete
for light, bell, fan and exhaust fan points in
Non-Residential Buildings

Taking Output = 6 Points 6 Points

a) Material
ELEC-1.5.1 14/0.3mm PVC FR flexible copper wire, 100 M 100 m 1051.00 100

ELEC-1.7.1 6A Switch, each 6 Nos 18.00 1

ELEC-1.7.13 6A 2 way Ceiling Rose each 6 Nos 21.00 1

ELEC-1.4.12 25 x 20 cms (10" x8") Decolam Board sqm 0.05 Nos 73.00 1

b) Labour charges :
Skilled Electrician day 0.60 day 648.00 1
Semi skilled Electrician day 1.20 day 540.00 1
Helpers day 0.60 day 540.00 1
C) Cost for 6 Points
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Point = C/6
2.1.2 Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm)
P.V.C. insulated F.R flexible copper cable
(ISI MARK) in existing pipe with 6A switch,
BLD-ELEC-2-1-2

Ceiling rose and 3mm thick hylam sheet


covering to switch control box including all
labour charges etc., complete for light, bell,
fan and exhaust fan points in Residential
Buildings.

Taking Output = 7 Points 7 Points

a) Material
ELEC-1.5.1 14/0.3mm PVC FR flexible copper wire, 100 M 100 m 1051.00 100
ELEC-1.7.1 6A Switch, each 7 Nos 18.00 1
ELEC-1.7.13 6A 2 way Ceiling Rose, ELEC-1.7.15 each 7 Nos 21.00 1
ELEC-1.4.19 25 x 20 cms (10" x8") Hylam sheet 3mm sqm 0.05 Nos 73.00 1
thick,
b) Labour charges :
Skilled Electrician day 0.70 day 648.00 1
Semi skilled Electrician day 1.40 day 540.00 1
Helpers day 0.70 day 540.00 1
C) Cost for 7 Points
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Point = C/7
2.1.3 Wiring with 2 of 14/0.3mm (1.0 Sq.mm)
BLD-ELEC-2-1-3 P.V.C. insulated F.R. flexible copper cable
(ISI MARK) in existing pipe with 6A switch
control and 3/2 pin sockets fixing on
separate board including all labour charges
etc., complete.

Taking Output = 15 Points 15 Point


s
a) Material
ELEC-1.5.1 14/0.3mm PVC FR flexible copper wire, 100 M 100 m 1051.00 100
ELEC-1.7.1 6A Switch, each 15 Nos 18.00 1
ELEC-1.7.4 6A 3 pin / 2 Pin Socket, each 15 Nos 27.00 1

b) Labour charges :
Skilled Electrician day 1.50 day 648.00 1
Semi skilled Electrician day 1.50 day 540.00 1
Helpers day 1.50 day 540.00 1
C) Cost for 15 Points
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Points = C/15
2.1.4 Supply and fixing of 6A 3 pin wall plug
BLD-ELEC-2-1-4

socket with 6A switch control on a common


switch board with earth continuity including
wire leads, earth connections along with all
labour charges etc., complete.

Taking Output = each 1 No


a) Material
ELEC-1.7.4 6A 3 pin / 2 Pin Socket, each 1 Nos 27.00 1
ELEC-1.7.1 6A Switch, each 1 Nos 18.00 1
b) Labour charges :
Skilled Electrician day 0.067 day 648.00 1
Helpers day 0.067 day 540.00 1

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges proposed for 1point
considering 15 per day
2.1.5 Supply and fixing of 16A 3pin / 6A 3pin plug
BLD-ELEC-2-1-5

socket with indicator lamp and 16Amps fuse


unit and 16 Amps switch control (5 in one)
on decolam sheet covered board including
earth connection and all labour charges etc.,
complete on wall.

Taking Output = each 1 No


a) Material
ELEC-1.4.11 20 x 15 cms (8" x6") Decolam sheet covered each 1 Nos 44.00 1
board,
ELEC-1.7.9 16A 3 pin / 6A 3pin Plug socket with shutter each 1 Nos 65.00 1
(5 in 1),
b) Labour charges :
Skilled Electrician day 0.10 day 648.00 1
Helpers day 0.10 day 540.00 1

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges proposed for 1point
considering 10 per day
2.1.6 Supply and Fixing of 16A 3pin and 6A 3pin
plug socket with indicator lamp and 16A fuse
BLD-ELEC-2-1-6

unit and 16A switch control (5 in 1) duly


recessed in wall with wooden deep box of 6"
x8" x2 1/2" size covered with hylam sheet
including earth connections and all labour
charges etc., complete.

Taking Output = each 1 No


a) Material
ELEC-1.4.4 20 x 15 cms (8" x6") Wooden deep box, each 1 Nos 30.00 1
ELEC-1.4.11 21.6 x 16.6 cms (8.5 x 6.5") 3mm thick each 1 Nos 44.00 1
Decolam Board
ELEC-1.7.9 16A 3 pin / 6A 3pin plug socket (5 in 1), each 1 Nos 65.00 1
b) Labour charges :
Skilled Electrician day 0.10 day 648.00 1
Semi Skilled Electrician day 0.10 day 540.00 1
Helpers day 0.10 day 540.00 1

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges proposed for 10 jobs
per day
BLD-ELEC-2-1-7

2.1.7 Supply and fixing of CFL holder in lieu of


ceiling rose of light point complete with all
connections and all labour charges with 18W
CFL (for new installation).
Taking Output = each 1 No
a) Material
ELEC-3.6.27 CFL holder each 1 Nos 32.00 1

ELEC-3.7.10 18W CFL each 1 Nos 115.00 1

b) Labour charges :
Skilled Electrician day 0.05 day 648.00 1
Helpers day 0.05 day 540.00 1

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : 1. The Cost of Ceiling Rose may be
deducted in view of holder.
2. Labour Charges proposed for 20 jobs per
day
BLD-ELEC-2-1-8

2.1.8 Supply and fixing of CFL holder / angle


holder on existing block, but without bulb
including all connections etc., complete (For
replacement).
Taking Output = each 1 No
a) Material
ELEC-3.6.27 CFL holder each 1 Nos 32.00 1

ELEC-1.7.13 Less : Cost of ceiling Rose, -1 Nos 21.00 1


b) Labour charges :
Skilled Electrician day 0.05 day 648.00 1
Helpers day 0.05 day 540.00 1

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
NOTE : Labour Charges proposed for 20
jobs per day
2.1.9 Supply and fixing of 0.5mtr length angle iron
BLD-ELEC-2-1-9

upright of size 40mmx40mmx6mm with eye


bolt and shackle insulator with accessories
and all labour charges etc., complete.

Taking Output = each 1 No


a) Material
ELEC-9.1.24 40 mm x 40 mm x 6 mm angle iron with I bolt. set 1 nos 250.00 1

ELEC-7.15.5 Supply and erecting porcelain pin/shackle each 1 Nos 90.00 1


type insulator suitable for L. T.

b) Labour charges :
Semi Skilled Electrician day 0.125 day 648.00 1
Mason 2nd class day 0.125 day 540.00 1
Welder 2nd Class day 0.125 day 540.00 1

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
NOTE : Labour Charges proposed for 8 jobs per day
2.1.10
BLD-ELEC-2-1-10

Supply and fixing of bed light transformer


with M.C. holders including giving
connections and cost of all accessories and
all labour charges etc., complete with bulb.

Taking Output = each


a) Material
Bed light transformer
ELEC-1.7.25 M.C.holder, each 1 Nos 21.00 1

ELEC-9.1.42 6.2V bulb, each 1 Nos 3.64 1

b) Labour charges :
Skilled Electrician day 0.05 day 648.00 1
Helpers day 0.05 day 540.00 1

Rate per each


NOTE : Labour Charges proposed for 20
jobs per day
2.1.11 Supply and fixing of night lamp fixed at 30
BLD-ELEC-2-1-11

cms height from floor level with 100 x 178 x


20 mm (4"x7"x3/4") wooden deep box,
acrylic cover and batten holder including
cost of all accessories and labour charges
etc., complete with bulb.

Taking Output = each 1 No


a) Material
ELEC-1.4.2 100 x 178 (4"x7") wooden deep box, each 1 Nos 18.00 1

ELEC-9.1.26 Acrylic cover, each 1 Nos 17.00 1

ELEC-3.6.27 Batten/CFL holder, each 1 Nos 32.00 1


ELEC-3.7.2 Zero watt bulb, each 1 Nos 11.00 1

b) Labour charges :
Skilled Electrician day 0.05 day 648.00 1
Helpers day 0.05 day 540.00 1

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
NOTE : Labour Charges proposed for 20
jobs per day
2.1.12
BLD-ELEC-2-1-12

Supply and fixing of buzzer / Calling bell on


100 x 100 mm (4"x4") decolam block
including giving connections, cost of all
accessories and labour charges etc.,
complete.
Taking Output = each 1 No
a) Material
ELEC-1.7.21 Buzzer, each 1 Nos 45.00 1

ELEC-1.4.8 100 x 100 mm (4"x4") decolam block, each 1 Nos 14.00 1

b) Labour charges :
Skilled Electrician day 0.062 day 648.00 1
Helpers day 0.062 day 540.00 1

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
NOTE : Labour Charges proposed for 16
BLD-ELEC-2-1-13 jobs per day
2.1.13 Supply and fixing of ding dong bell on 100 x
178 mm (4"x7") decolam block including
giving connections cost of all accessories
and all labour charges etc., complete.
Taking Output = each 1 No
a) Material
ELEC-1.7.22 Ding Dong bell, each 1 Nos 102.00 1

ELEC-1.4.9 100 x 178 mm (4"x7") Decolam block, each 1 Nos 25.00 1

b) Labour charges :
Skilled Electrician day 0.062 day 648.00 1
Helpers day 0.062 day 540.00 1

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
NOTE : Labour Charges proposed for 16
jobs per day
2.1.14
BLD-ELEC-2-1-14

Supply and fixing of Electronic musical bell


on 150 x 200 mm (6"x8") decolam block
including giving connections cost of all
accessories and all labour charges etc.,
complete.
Taking Output = each 1 No
a) Material
ELEC-1.7.23 Electronic Musical bell, Nos 1 Nos 240.00 1

ELEC-1.4.11 150 x 200 mm (6"x8") Decolam block, Nos 1 Nos 44.00 1

b) Labour charges :
Skilled Electrician day 0.062 day 648.00 1
Helpers day 0.062 day 540.00 1

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
NOTE : Labour Charges proposed for 16
jobs per day
3 RUN OF MAINS - ( BLD-ELEC-3 )
3.1 Wiring with F.R P.V.C. insulated flexible
BLD-ELEC-3-1-1

copper cable
3.1.1 Supply and run of 2 of 14/0.3mm (1.0
Sq.mm) F.R P.V.C. insulated flexible copper
cable in existing pipe for mains inlcuding all
labour charges etc., complete.

Taking Output = 100 M 100 m


a) Material
ELEC-1.5.1 14/0.3mm FR PVC copper wire, 100 M 200 m 1051.00 100
b) Labour charges :
Skilled Electrician day 0.67 day 648.00 1
Semi Skilled Electrician day 2.00 day 540.00 1
Helpers day 0.67 day 540.00 1
Sundries
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
Note : Labour Charges considered for 150 M / day
3.1.2 Supply and run of 1 of 14 /0.3mm (1.0
BLD-ELEC-3-1-2

Sq.mm) FR P.V.C. insulated flexible copper


cable in existing pipe for earth continuity
including all labour charges etc., complete.

Taking Output = 100 M 100 m


a) Material
ELEC-1.5.1 14/0.3mm FR PVC copper wire, 100 M 100 m 1051.00 100

b) Labour charges :
Skilled Electrician day 0.34 day 648.00 1
Semi Skilled Electrician day 1.00 day 540.00 1
Helpers day 0.34 day 540.00 1
Sundries
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
Note : Labour Charges considered for 150 M / day
3.1.3 Supply and run of 2 of 22/0.3mm (1.5
BLD-ELEC-3-1-3

Sq.mm) F.R P.V.C. insulated flexible copper


cable in existing pipe for mains inlcuding all
labour charges etc., complete.

Taking Output = 100 M 100 m


a) Material
ELEC-1.5.2 22/0.3mm (1.5Sq mm) FR PVC copper wire, 100 M 200 m 1555.00 100

b) Labour charges :
Skilled Electrician day 0.67 day 648.00 1
Semi Skilled Electrician day 2.00 day 540.00 1
Helpers day 0.67 day 540.00 1
Sundries
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
Note : Labour Charges considered for 150 M / day
3.1.4 Supply and run of 2 of 36/0.3mm (2.5
BLD-ELEC-3-1-4
Sq.mm) F.R P.V.C. insulated flexible copper
cable in existing pipe for mains inlcuding all
labour charges etc., complete.

Taking Output = 100 M 100 m


a) Material
ELEC-1.5.3 36/0.3mm (2.5 sqmm) FR PVC copper wire, 100 M 200 m 2510.00 100

b) Labour charges :
Skilled Electrician day 0.67 day 648.00 1
Semi Skilled Electrician day 2.00 day 540.00 1
Helpers day 0.67 day 540.00 1
Sundries
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
Note : Labour Charges considered for 150 M / day
3.1.4 (a) Supply and run of 1 of 36/0.3mm (2.5
BLD-ELEC-3-1-4

Sq.mm) F.R P.V.C. insulated flexible copper


cable in existing pipe for earth continuity
inlcuding all labour charges etc., complete.

Taking Output = 100 M 100 m


a) Material
ELEC-1.5.10 36/0.3mm (2.5 sqmm) FR PVC copper wire, 100 M 100 m 2510.00 100

b) Labour charges :
Skilled Electrician day 0.34 day 648.00 1
Semi Skilled Electrician day 1.00 day 540.00 1
Helpers day 0.34 day 540.00 1
Sundries
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
Note : Labour Charges considered for 150 M / day
3.1.5 Supply and run of 2 of 56/0.3mm (4 Sq.mm)
BLD-ELEC-3-1-5

FR P.V.C. insulated flexible copper cable in


existing pipe for mains inlcuding all labour
charges etc., complete.

Taking Output = 100 M 100 m


a) Material
ELEC-1.5.4 56 /0.3mm (4 sqmm)FR PVC flexible copper 100 M 200 m 3833.00 100
wire,
b) Labour charges :
Skilled Electrician day 1.00 day 648.00 1
Semi Skilled Electrician day 3.00 day 540.00 1
Helpers day 1.00 day 540.00 1
Sundries
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
Note : Labour Charges considered for 100 M / day
3.1.6 Supply and run of 2 of 84/0.3mm (6.0
BLD-ELEC-3-1-6

Sq.mm) FR P.V.C. insulated flexible copper


cable in existing pipe for mains inlcuding all
labour charges etc., complete.

Taking Output = 100 M 100 m


a) Material
ELEC-1.5.5 84 /0.3mm (6 Sq.mm) FR PVC flexible 100 M 200 m 5828.00 100
copper wire.
b) Labour charges :
Skilled Electrician day 1.00 day 648.00 1
Semi Skilled Electrician day 3.00 day 540.00 1
Helpers day 1.00 day 540.00 1
Sundries
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
Note : Labour Charges considered for 100 M / day
3.3.7 Supply and run of 2 of 140 /0.3mm (10
BLD-ELEC-3-1-7

Sq.mm) F.R PVC insulated flexible copper


cable in existing pipe for mains including all
labour charges etc., complete.

Taking Output = 100 M 100 m


a) Material
ELEC-1.5.6 140/0.3 (10 Sq.mm) FR PVC flexible copper 100 M 200 m 9030.00 100
wire,
b) Labour charges :
Skilled Electrician day 1 day 648.00 1
Semi Skilled Electrician day 3 day 540.00 1
Helpers day 1 day 540.00 1
Sundries
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
Note : Labour Charges considered for 100 M / day
3.3.8 Supply and run of 2 of 126 /0.4mm (16
BLD-ELEC-3-1-8 Sq.mm) F.R PVC insulated flexible copper
cable in existing pipe for mains including all
labour charges etc., complete.

Taking Output = 100 M 100 m


a) Material
ELEC-1.5.7 126/0.4mm (16 Sq.mm) FR PVC flexible 100 M 200 m 14280.00 100
copper wire,
b) Labour charges :
Skilled Electrician day 1 day 648.00 1
Semi Skilled Electrician day 3 day 540.00 1
Helpers day 1 day 540.00 1
Sundries
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
Note : Labour Charges considered for 100 M / day
BLD-ELEC-4-1-1
4 SWITCH GEAR & MCB DISTRIBUTION
BOARDS. (BLD-ELEC-4)

4.1 Panel Mounting Cubical type SDF


4.1.1 Supply and erection of Panel mounting
cubical type 30 / 32A TPN 415V, 50 Hz.
switch disconnector fuse unit complete with
front drive mechanism with door inter lock,
padlocking arrangement etc., complete with
fuse links on existing control panel.

Taking Output = each 1 No


a) Material
ELEC-2.1.1 30 / 32A TPN 415V, 50 Hz. switchs each 1 Nos 1351.00 1
Disconnector fuse unit with HRC fuses.
ELEC-2.5.1 HRC fuse each 1 Nos 50.00 1

b) Labour charges :
Skilled Electrician day 0.167 day 648.00 1
Semi Skilled Electrician day 0.167 day 540.00 1
Helpers day 0.333 day 540.00 1
Sundries such as hardware etc., LS

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 6 jobs / day
4.1.2 Supply and erection of Panel mounting
BLD-ELEC-4-1-2

cubical type 60 / 63A TPN 415V, 50 Hz.


switch disconnector fuse unit complete with
front drive mechanism with door inter lock,
padlocking arrangement etc., complete with
fuse links on existing control panel.

Taking Output = each 1 No


a) Material
ELEC-2.1.2 60 / 63A TPN 415V, 50 Hz. switchs each 1 Nos 2329.00 1
Disconnector fuse unit with HRC fuses.
ELEC-2.5.2 Supply of 32A to 63A HRC Fuse Links of each 1 Nos 77.00 1
makes L & T / G E /
C & S / Standard / HPL / Havells.

b) Labour charges :
Skilled Electrician day 0.167 day 648.00 1
Semi Skilled Electrician day 0.167 day 540.00 1
Helpers day 0.333 day 540.00 1
Sundries such as hardware etc., LS

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 6 jobs / day
4.1.3 Supply and erection of Panel mounting
BLD-ELEC-4-1-3 cubical type 100A TPN 415V, 50 Hz. switch
disconnector fuse unit complete with front
drive mechanism with door inter lock,
padlocking arrangement etc., complete with
fuse links on existing control panel.

Taking Output = each 1 No


a) Material
ELEC-2.1.3 Supply of 125A TPN Switch Disconnector Fuse Unit each 1 Nos 5578.00 1
Cubical
type without fuses of makes L&T / G E / C&S /
ABB / SIEMENS

ELEC-2.5.3 Supply of 125A to 200A HRC Fuse Links of makes L & T each 1 Nos 248.00 1
/ G E/ C & S / Standard / HPL / Havells.

b) Labour charges :
Skilled Electrician day 0.167 day 648.00 1
Semi Skilled Electrician day 0.167 day 540.00 1
Helpers day 0.333 day 540.00 1
Sundries such as hardware etc., LS

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 6 jobs / day
4.1.4 Supply and erection of Panel mounting
cubical type 200A TPN 415V, 50 Hz. switch
BLD-ELEC-4-1-4

disconnector fuse unit complete with front


drive mechanism with door inter lock,
padlocking arrangement etc., complete with
fuse links on existing control panel.

Taking Output = each 1 No


a) Material
ELEC-2.1.4 200A TPN 415V, 50 Hz. switchs each 1 Nos 7280.00 1
Disconnector fuse unit with HRC fuses..
ELEC-2.5.3 Supply of 125A to 200A HRC Fuse Links of each 1 Nos 248.00 1
makes L & T / G E/ C & S / Standard / HPL /
Havells.

b) Labour charges :
Skilled Electrician day 0.200 day 648.00 1
Semi Skilled Electrician day 0.400 day 540.00 1
Helpers day 0.400 day 540.00 1
Sundries such as hardware etc., LS

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 5 jobs / day
4.1.5 Supply and erection of Panel mounting
BLD-ELEC-4-1-5 cubical type 250A TPN 415V, 50 Hz. switch
disconnector fuse unit complete with front
drive mechanism with door inter lock,
padlocking arrangement etc., complete with
fuse links on existing control panel.

Taking Output = each 1 No


a) Material
ELEC-2.1.5 250A TPN 415V, 50 Hz. switchs each 1 Nos 8740.00 1
Disconnector fuse unit with HRC fuses.
ELEC-2.5.4 Supply of 250A to 350A HRC Fuse Links of each 1 Nos 363.00 1
makes L & T / G E/ C & S / Standard / HPL /
Havells.

b) Labour charges :
Skilled Electrician day 0.20 day 648.00 1
Semi Skilled Electrician day 0.40 day 540.00 1
Helpers day 0.40 day 540.00 1
Sundries such as hardware etc., LS

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 5 jobs
/ day
4.1.6 Supply and erection of Panel mounting
cubical type 400A TPN 415V, 50 Hz. switch
BLD-ELEC-4-1-6

disconnector fuse unit complete with front


drive mechanism with door inter lock,
padlocking arrangement etc., complete with
fuse links on existing control panel.

Taking Output = each 1 No


a) Material
ELEC-2.1.6 400A TPN 415V, 50 Hz. switchs each 1 Nos 13445.00 1
Disconnector fuse unit with HRC fuses.
ELEC-2.5.5 Supply of 400A HRC Fuse Links of makes L & T / G E / each 1 Nos 704.00 1
C & S/ Standard / HPL / Havells.

b) Labour charges :
Skilled Electrician day 0.25 day 648.00 1
Semi Skilled Electrician day 0.5 day 540.00 1
Helpers day 0.5 day 540.00 1
Sundries such as hardware etc., LS

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 4 jobs
/ day
4.1.7 Supply and erection of Panel mounting
BLD-ELEC-4-1-7 cubical type 630A TPN 415V, 50 Hz. switch
disconnector fuse unit complete with front
drive mechanism with door inter lock,
padlocking arrangement etc., complete with
fuse links on existing control panel.

Taking Output = each 1 No


a) Material
ELEC-2.1.7 630A TPN 415V, 50 Hz. switchs each 1 Nos 22759.00 1
Disconnector fuse unit
ELEC-2.5.6 Supply of 630A HRC Fuse Links of makes L & T / G E / each 1 Nos 1425.00 1
C & S / Standard / HPL / Havells.

b) Labour charges :
Skilled Electrician day 0.25 day 648.00 1
Semi Skilled Electrician day 0.5 day 540.00 1
Helpers day 0.5 day 540.00 1
Sundries such as hardware etc., LS

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 4 jobs / day
4.2 Panel Mounting Cubical type, 4pole
onload change over switch confirming to
BLD-ELEC-4-2-1

IS 13947-3-1993.
4.2.1 Supply and erection of Panel mounting
cubical type L.T heavy duty ON LOAD
change over switch of 60 / 63A, 4 pole,
415V, 50 Hz. with all accessories etc.,
complete on existing control panel.
Taking Output = each 1 No
a) Material
ELEC-2.2.1 60 / 63A, 4 Pole, 415V, 50 Hz. On load each 1 Nos 4135.00 1
cubical type C.O.S,
b) Labour charges :
Skilled Electrician day 0.167 day 648.00 1
Semi Skilled Electrician day 0.167 day 540.00 1
Helpers day 0.333 day 540.00 1

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 6 jobs / day
4.2.2 Supply and erection of Panel mounting
BLD-ELEC-4-2-2

cubical type L.T heavy duty ON LOAD


change over switch of 125A, 4 pole, 415V,
50 Hz. with all accessories etc., complete on
existing control panel.
Taking Output = each 1 No
a) Material
ELEC-2.2.2 125A, 4 Pole, 415V, 50 Hz. On load cubical each 1 Nos 7828.00 1
type C.O.S,
b) Labour charges :
Skilled Electrician day 0.167 day 648.00 1
Semi Skilled Electrician day 0.167 day 540.00 1
Helpers day 0.333 day 540.00 1
Sundries such as hardware etc., LS

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 6 jobs / day
4.2.3 Supply and erection of Panel mounting
BLD-ELEC-4-2-3

cubical type L.T heavy duty ON LOAD


change over switch of 200A, 4 pole, 415V,
50 Hz. with all accessories etc., complete on
existing control panel.
Taking Output = each 1 No
a) Material
ELEC-2.2.3 200A, 4 Pole, 415V, 50 Hz. On load cubical each 1 Nos 10474.00 1
type C.O.S,
b) Labour charges :
Skilled Electrician day 0.200 day 648.00 1
Semi Skilled Electrician day 0.400 day 540.00 1
Helpers day 0.400 day 540.00 1
Sundries such as hardware etc., LS

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 5 jobs / day
4.2.4 Supply and erection of Panel mounting
BLD-ELEC-4-2-4

cubical type L.T heavy duty ON LOAD


change over switch of 250A, 4 pole, 415V,
50 Hz. with all accessories etc., complete on
existing control panel.
Taking Output = each 1 No
a) Material
ELEC-2.2.4 250A, 4 Pole, 415V, 50 Hz. On load cubical each 1 Nos 14884.00 1
type C.O.S,
b) Labour charges :
Skilled Electrician day 0.200 day 648.00 1
Semi Skilled Electrician day 0.400 day 540.00 1
Helpers day 0.400 day 540.00 1
Sundries such as hardware etc., LS

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 5 jobs / day
BLD-ELEC-4-2-5 4.2.5 Supply and erection of Panel mounting
cubical type L.T heavy duty ON LOAD
change over switch of 400A, 4 pole, 415V,
50 Hz. with all accessories etc., complete on
existing control panel.
Taking Output = each 1 No
a) Material
ELEC-2.2.5 400A, 4 Pole, 415V, 50 Hz. On load cubical each 1 Nos 22712.00 1
type C.O.S,
b) Labour charges :
Skilled Electrician day 0.250 day 648.00 1
Semi Skilled Electrician day 0.500 day 540.00 1
Helpers day 0.500 day 540.00 1
Sundries such as hardware etc., LS

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 4 jobs / day
4.2.6 Supply and erection of Panel mounting
BLD-ELEC-4-2-6

cubical type L.T heavy duty ON LOAD


change over switch of 630A, 4 pole, 415V,
50 Hz. with all accessories etc., complete on
existing control panel.
Taking Output = each 1 No
a) Material
ELEC-2.2.6 630A, 4 Pole, 415V, 50 Hz. On load cubical each 1 Nos 27012.00 1
type C.O.S,
b) Labour charges :
Skilled Electrician day 0.250 day 648.00 1
Semi Skilled Electrician day 0.500 day 540.00 1
Helpers day 0.500 day 540.00 1
Sundries such as hardware etc., LS

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 4 jobs / day
4.2.7 Supply and erection of Panel mounting
BLD-ELEC-4-2-7

cubical type L.T heavy duty ON LOAD


change over switch of 800A, 4 pole, 415V,
50 Hz. with all accessories etc., complete on
existing control panel.
Taking Output = each 1 No
a) Material
ELEC-2.8.22 800A, 4 Pole, 415V, 50 Hz. On load cubical each 1 Nos 1
type C.O.S,
b) Labour charges :
Skilled Electrician day 1.00 day 1
Semi Skilled Electrician day 1.00 day 1
Helpers day 1.00 day 1
Sundries such as hardware etc., LS

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
4.2.8 Supply and erection of Panel mounting
cubical type L.T heavy duty ON LOAD
change over switch of 1060A, 4 pole, 415V,
50 Hz. with all accessories etc., complete on
existing control panel.
Taking Output = each 1 No
a) Material
ELEC-2.2.8 1060A, 4 Pole, 415V, 50 Hz. On load cubical each 1 Nos 0.00 1
type C.O.S,
b) Labour charges :
Skilled Electrician day 1.00 day 0.00 1
Semi Skilled Electrician day 1.00 day 0.00 1
Helpers day 1.00 day 0.00 1
Sundries such as hardware etc., LS

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
4.3 Panel Mounting Moulded Case Circute
Breakers (MCCBs)
BLD-ELEC-4-3-1

4.3.1 Supply and erection of Panel mounting 60 /


63A, 3 Pole, 10 /16kA, MCCB with thermal
magnetic setting / Microprocessor based
release arrangement with all connections
etc., complete on existing panel.

Taking Output = each 1 No


a) Material
ELEC-2.8.1 60 / 63A, 3 Pole, 10 / 16kA, MCCB. each 1 Nos 6060.00 1
b) Labour charges :
Skilled Electrician day 0.167 day 648.00 1
Semi Skilled Electrician day 0.167 day 540.00 1
Helpers day 0.333 day 540.00 1
Sundries such as hardware etc., LS

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 6 jobs / day
4.3.2 Supply and erection of Panel mounting 60 /
BLD-ELEC-4-3-2 63A, 4 Pole, 10 / 16kA, MCCB with thermal
magnetic setting / Microprocessor based
release arrangement with all connections
etc., complete on existing panel.

Taking Output = each 1 No


a) Material
ELEC-2.8.5 Cost of 60 / 63A, 4 Pole Panel mounting each 1 Nos 6813.00 1
10 / 16 kA, MCCB,
b) Labour charges :
Skilled Electrician day 0.167 day 648.00 1
Semi Skilled Electrician day 0.167 day 540.00 1
Helpers day 0.333 day 540.00 1
Sundries such as hardware etc., LS

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 6 jobs / day
4.3.3 Supply and erection of Panel mounting
BLD-ELEC-4-3-3

125A, 3 Pole, 25kA, MCCB with thermal


magnetic setting / Microprocessor based
release arrangement with all connections
etc., complete on existing panel.
Taking Output = each 1 No
a) Material
ELEC-2.8.2 Cost of 125A, 3 Pole, 25 kA panel mounting each 1 Nos 7194.00 1
MCCB.
b) Labour charges :
Skilled Electrician day 0.167 day 648.00 1
Semi Skilled Electrician day 0.167 day 540.00 1
Helpers day 0.333 day 540.00 1
Sundries such as hardware etc., LS

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 6 jobs / day
4.3.4 Supply and erection of Panel mounting
BLD-ELEC-4-3-4

125A, 4 Pole, 25kA, MCCB with thermal


magnetic setting / Microprocessor based
release arrangement with all connections
etc., complete on existing panel.

Taking Output = each 1 No


a) Material
ELEC-2.8.6 Cost of 125A, 4 Pole, 25 kA panel mounting each 1 Nos 8700.00 1
MCCB.
b) Labour charges :
Skilled Electrician day 0.167 day 648.00 1
Semi Skilled Electrician day 0.167 day 540.00 1
Helpers day 0.333 day 540.00 1
Sundries such as hardware etc., LS

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 6 jobs / day
4.3.5 Supply and erection of Panel mounting
BLD-ELEC-4-3-5

250A, 3 Pole, 35 / 36kA, MCCB with thermal


magnetic setting / Microprocessor based
release arrangement with all connections
etc., complete on existing panel.

Taking Output = each 1 No


a) Material
ELEC-2.8.3 250A, 3 Pole, 36/35kA panel mounting each 1 Nos 16025.00 1
MCCB,
b) Labour charges :
Skilled Electrician day 0.200 day 648.00 1
Semi Skilled Electrician day 0.400 day 540.00 1
Helpers day 0.400 day 540.00 1
Sundries such as hardware etc., LS

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each

4.3.6 Supply and erection of Panel mounting


BLD-ELEC-4-3-6

250A, 4 Pole, 35 / 36kA, MCCB with thermal


magnetic setting / Microprocessor based
release arrangement with all connections
etc., complete on existing panel.

Taking Output = each 1 No


a) Material
ELEC-2.8.7 250A, 4 Pole, 36/35kA panel mounting each 1 Nos 20818.00 1
MCCB,
b) Labour charges :
Skilled Electrician day 0.200 day 648.00 1
Semi Skilled Electrician day 0.400 day 540.00 1
Helpers day 0.400 day 540.00 1
Sundries such as hardware etc., LS

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 5 jobs / day
4.3.7 Supply and erection of Panel mounting
BLD-ELEC-4-3-7 400A, 4 Pole, 35 /36kA, MCCB with thermal
magnetic setting / Microprocessor based
release arrangement with all connections
etc., complete on existing panel.

Taking Output = each 1 No


a) Material
ELEC-2.8.8 400A, 4 Pole, 36/35kA panel mounting each 1 Nos 26208.00 1
MCCB,
b) Labour charges :
Skilled Electrician day 0.200 day 648.00 1
Semi Skilled Electrician day 0.400 day 540.00 1
Helpers day 0.400 day 540.00 1
Sundries such as hardware etc., LS

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 5 jobs / day
4.4 DISTRIBUTION BOARDS
4.4.1 Supply and fixing SPN Distribution board
BLD-ELEC-4-4-1A

with IP-20 protection suitable for single


phase Earth Leakage Circute Braker (ELCB)
/ Residual Current Circute Braker (RCCB) /
Double Pole (DP) Isolator as incomer and
10kA SP MCBs as out going including
internal connections and labour charges for
surface / flush mounting etc., complete.

A 40A DP Isolator / RCCB / ELCB - 1 No for


incomer, 6-32A SP MCBs - 4Nos for
outgoing.
Taking Output = each 1 No
a) Material
ELEC-2.9.1 SPN 4way D.B with IP-20 Protection suitable each 1 Nos 760.00 1
for single phase ECCB / RCCB/ DP Isolator.

ELEC-2.10.2 40A D.P.Isolator / ECCB / RCCB, each 1 Nos 367.00 1

ELEC-2.9.1 10 kA - 6-32A range SP MCBs, each 4 Nos 201.00 1


b) Labour charges :
Skilled Electrician day 0.500 day 648.00 1
Semi Skilled Electrician day 0.500 day 540.00 1
Helpers day 1.000 day 540.00 1
Sundries such as hardware, cement etc, LS

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 2 jobs / day
4-4-1B 40A DP Isolator / RCCB / ELCB - 1 No for
BLD-ELEC-4-4-1B incomer, 6-32A SP MCBs - 6Nos for
outgoing.
Taking Output = each 1 No
a) Material
ELEC-2.12.2 SPN 8way D.B with IP-20 Protection suitable each 1 Nos 800.00 1
for single phase ECCB / RCCB/ DP Isolator.

ELEC-2.10.2 40A D.P.Isolator / ECCB / RCCB, each 1 Nos 367.00 1

ELEC-2.9.1 10 kA - 6-32A range SP MCBs, each 6 Nos 201.00 1


b) Labour charges :
Skilled Electrician day 0.50 day 648.00 1
Semi Skilled Electrician day 0.50 day 540.00 1
Helpers day 1.00 day 540.00 1
Sundries such as hardware, cement etc, LS

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 2 jobs / day
C 40A DP Isolator / RCCB / ELCB - 1 No for
incomer, 6-32A SP MCBs - 8Nos for
BLD-ELEC-4-4-1C

outgoing.
Taking Output = each 1 No
a) Material
ELEC-2.12.3 SPN 12 way D.B with IP-20 Protection each 1 Nos 1045.00 1
suitable for single phase ECCB / RCCB/ DP
Isolator.
ELEC-2.10.2 40A D.P.Isolator / ECCB / RCCB, each 1 Nos 367.00 1

ELEC-2.9.1 10 kA - 6-32A range SP MCBs, each 8 Nos 201.00 1


b) Labour charges :
Skilled Electrician day 0.50 day 648.00 1
Semi Skilled Electrician day 0.50 day 540.00 1
Helpers day 1.00 day 540.00 1
Sundries such as hardware, cement etc, LS

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 2 jobs / day
4.4.2 Supply and fixing SPN Distribution board
with IP-42 protection (Metal Door) suitable
for single phase ELCB / RCCB/DP Isolator
BLD-ELEC-4-4-2A

as incomer and 10kA SP MCBs as outing


going including internal connection and
labour charges for surface / flush mounting
etc., complete.

A 40A DP Isolator/ RCCB / ELCB - 1 No for


incomer, 6-32A SP MCBs - 4Nos for
outgoing.
Taking Output = each 1 No
a) Material
ELEC-2.12.4 SPN 4 way D.B with IP-42 Protection (MD) each 1 Nos 990.00 1
suitable for single phase ECCB / RCCB/ DP
Isolator.
ELEC-2.10.2 40A D.P.Isolator / ECCB / RCCB, each 1 Nos 367.00 1

ELEC-2.9.1 10 kA - 6-32A range SP MCBs, each 4 Nos 201.00 1


b) Labour charges :
Skilled Electrician day 0.50 day 648.00 1
Semi Skilled Electrician day 0.50 day 540.00 1
Helpers day 1.00 day 540.00 1
Sundries such as hardware, cement etc, LS

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
BLD-ELEC-4-4-2B

Note : Labour Charges considered for 2 jobs / day


B 40A DP Isolator / RCCB / ELCB - 1 No for
incomer, 6-32A SP MCBs - 6Nos for
outgoing.
Taking Output = each 1 No
a) Material
ELEC-2.12.5 SPN 8 way D.B with IP-42 Protection (MD) each 1 Nos 1245.00 1
suitable for single phase ECCB / RCCB/ DP
Isolator
ELEC-2.10.2 40A D.P.Isolator / ECCB / RCCB, each 1 Nos 367.00 1

ELEC-2.9.1 10 kA - 6-32A range SP MCBs, each 6 Nos 201.00 1


b) Labour charges :
Skilled Electrician day 0.50 day 648.00 1
Semi Skilled Electrician day 0.50 day 540.00 1
Helpers day 1.00 day 540.00 1
Sundries such as hardware, cement etc, LS

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
BLD-ELEC-4-4-2C

Note : Labour Charges considered for 2 jobs / day


C 40A DP Isolator/ RCCB / ELCB - 1 No for
incomer, 6-32A SP MCBs - 8 Nos for
outgoing.
Taking Output = each 1 No
a) Material
ELEC-2.12.6 SPN 12 way D.B with IP-42 Protection (MD) each 1 Nos 1505.00 1
suitable for single phase ECCB / RCCB/ DP
Isolator.
ELEC-2.10.2 40A D.P.Isolator / ECCB / RCCB, each 1 Nos 367.00 1

ELEC-2.9.1 10 kA - 6-32A range SP MCBs, each 8 Nos 201.00 1


b) Labour charges :
Skilled Electrician day 0.50 day 648.00 1
Semi Skilled Electrician day 0.50 day 540.00 1
Helpers day 1.00 day 540.00 1
Sundries such as hardware, cement etc, LS

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 2 jobs / day
4.4.3 Supply and fixing TPN Distribution board
with IP-20 protection suitable for 3 phase
ELCB / RCCB / FP Isolator as incomer and
BLD-ELEC-4-4-3A

10kA SP MCBs as outing going including


internal connection and labour charges for
surface / flush mounting etc., complete.

A 40A FP Isolator/ RCCB / ELCB - 1 No for


incomer, 10kA-6-32A SP MCBs -
12Nos for outgoing.
Taking Output = each 1 No
a) Material
ELEC-2.12.19 4way TPN, D.B with IP-20 Protection each 1 Nos 1500.00 1
suitable for 3 phase ELCB / RCCB/ FP
Isolator as incommer.
ELEC-2.10.11 40A D.P.Isolator / ECCB / RCCB, each 1 Nos 367.00 1
ELEC-2.9.1 10 kA - 6-32A range SP MCBs, each 12 Nos 201.00 1
b) Labour charges :
Skilled Electrician day 0.50 day 648.00 1
Semi Skilled Electrician day 1.00 day 540.00 1
Helpers day 1.00 day 540.00 1
Sundries such as TW Plugs, Screws Cement LS
etc,

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
BLD-ELEC-4-4-3B

Note : Labour Charges considered for 2 jobs / day


B 63A FP Isolator - 1 No for incomer, 10kA-
6-32A SP MCBs - 12Nos for outgoing.

Taking Output = each 1 No


a) Material
ELEC-2.12.19 4way TPN, D.B with IP-20 Protection each 1 Nos 1500.00 1
suitable for 3 phase ELCB / RCCB/ FP
Isolator as incommer.
ELEC-2.10.7 63A, 4 Pole Isolator / ELCB / RCCB, each 1 Nos 890.00 1

ELEC-2.9.1 10 kA - 6-32A range SP MCBs, each 12 Nos 201.00 1


b) Labour charges :
Skilled Electrician day 0.50 day 648.00 1
Semi Skilled Electrician day 1.00 day 540.00 1
Helpers day 1.00 day 540.00 1
Sundries such as TW Plugs, Screws Cement LS
etc,

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
BLD-ELEC-4-4-3C

Note : Labour Charges considered for 2 jobs / day


C 100A FP Isolator - 1 No for incomer, 10kA-
6-32A SP MCBs - 18Nos for outgoing.

Taking Output = each 1 No


a) Material
ELEC-2.12.20 8 way TPN, D.B with IP-20 Protection each 1 Nos 3750.00 1
suitable for 3 phase ELCB / RCCB/ FP
Isolator as incommer.ELEC-2.12.57
ELEC-2.10.8 100A, 4 Pole Isolator / ELCB / RCCB, each 1 Nos 956.00 1

ELEC-2.9.1 10 kA - 6-32A range SP MCBs, each 18 Nos 201.00 1


b) Labour charges :
Skilled Electrician day 0.50 day 648.00 1
Semi Skilled Electrician day 1.00 day 540.00 1
Helpers day 1.00 day 540.00 1
Sundries such as TW Plugs, Screws Cement LS
etc,

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 2 jobs / day
4.4.4 Supply and fixing TPN Distribution board
with IP-42 protection (Metal Door) suitable
for 3 phase ELCB / RCCB / FP Isolator as
BLD-ELEC-4-4-4A

incomer and 10kA SP MCBs as outing going


including internal connection and labour
charges for surface / flush mounting etc.,
complete.

A 40A FP Isolator - 1 No for incomer, 10kA-


6-32A SP MCBs - 12Nos for outgoing.

Taking Output = each 1 No


a) Material
ELEC-2.12.21 4way TPN, D.B with IP-42 Protection (MD) each 1 Nos 2491.00 1
suitable for 3 phase ELCB / RCCB/ FP
Isolator as incommer.
ELEC-2.10.6 40A, 4 Pole Isolator / ELCB / RCCB, each 1 Nos 814.00 1

ELEC-2.9.1 10 kA - 6-32A range SP MCBs, each 12 Nos 201.00 1


b) Labour charges :
Skilled Electrician day 0.50 day 648.00 1
Semi Skilled Electrician day 1.00 day 540.00 1
Helpers day 1.00 day 540.00 1
Sundries such as TW Plugs, Screws Cement LS
etc,

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
BLD-ELEC-4-4-4B

Note : Labour Charges considered for 2 jobs / day


B 63A FP Isolator - 1 No for incomer, 10kA-
6-32A SP MCBs - 12Nos for outgoing.

Taking Output = each 1 No


a) Material
ELEC-2.12.59 4way TPN, D.B with IP-42 Protection (MD) each 1 Nos 2491.00 1
suitable for 3 phase ELCB / RCCB/ FP
Isolator as incommer.
ELEC-2.10.7 63A, 4 Pole Isolator / ELCB / RCCB, each 1 Nos 890.00 1

ELEC-2.9.1 10 kA - 6-32A range SP MCBs, each 12 Nos 201.00 1


b) Labour charges :
Skilled Electrician day 0.50 day 648.00 1
Semi Skilled Electrician day 1.00 day 540.00 1
Helpers day 1.00 day 540.00 1
Sundries such as TW Plugs, Screws Cement LS
etc,

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
BLD-ELEC-4-4-4C

Note : Labour Charges considered for 2 jobs / day


C 80A FP Isolator - 1 No for incomer, 6-32A
SP MCBs - 18Nos for outgoing.
Taking Output = each 1 No
a) Material
ELEC-2.12.22 8 way TPN, D.B with IP-42 Protection (MD) each 1 Nos 7770.00 1
suitable for 3 phase ELCB / RCCB/ FP
Isolator as incommer. ELEC-2.12.60
ELEC-2.10.26 80A, 4 Pole Isolator / ELCB / RCCB, each 1 Nos 0.00 1
ELEC-2.9.1 10 kA - 6-32A range SP MCBs, each 18 Nos 201.00 1
b) Labour charges :
Skilled Electrician day 0.50 day 648.00 1
Semi Skilled Electrician day 1.00 day 540.00 1
Helpers day 1.00 day 540.00 1
Sundries such as TW Plugs, Screws Cement LS
etc,

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 2 jobs / day
4.4.5 Supply and fixing TPN - Vertical type
BLD-ELEC-4-4-5A Distribution board with IP - 20 Protection
suitable for 3 phase ELCB / RCCB / FP
Isolator as incomer and 10 kA TP / SP MCBs
as outing going including internal connection
and labour charges for surface / flush
mounting etc., complete.

A Incomer : 63A FP Isolator / ELCB / RCCB

Outgoing : 32A TP MCBs 2 Nos and 6-


32A SP MCBs 6 Nos
a) Material
4way TPN - Vertical type DB with IP-20 Nos 1 Nos 1
protection suitable for 3 Phase ELCB /
RCCB / 4 Pole Isolator as in commer and TP
/ SP MCBs as outgoing with Bus-bar
arrangment etc., ELEC-2.12.63
ELEC-2.10.7 63Apms, 4 Pole Isolator / ELCB / RCCB Nos 1 Nos 1

ELEC-2.9.13 32A TP MCBs, Nos 2 Nos 1


ELEC-2.9.1 10 kA - 6-32A range SP MCBs, Nos 6 Nos 1
b) Labour charges :
Skilled Electrician day 0.50 day 648.00 1
Semi Skilled Electrician day 1.00 day 540.00 1
Helpers day 1.00 day 540.00 1
Sundries, suchas T.W plugs, Screws, LS
Cement etc,

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
BLD-ELEC-4-4-5B

Note : Labour Charges considered for 2 jobs / day


B Incomer : 80A FP Isolator / ELCB / RCCB

Outgoing : 32A TP MCBs 4 Nos and 6-


32A SP MCBs 12Nos
a) Material
ELEC-2.9.1 8way TPN - Vertical type DB with IP-20 Nos 1 Nos #REF! 1
protection suitable for 3 Phase ELCB /
RCCB / 4 Pole Isolator as in commer and TP
/ SP MCBs as outgoing with Bus-bar
arrangment etc.,ELEC-2.9.1
ELEC-2.10.8 100 Apms, 4 Pole Isolator / ELCB / RCCB, Nos 1 Nos 956.00 1

ELEC-2.9.13 32A TP MCBs, Nos 4 Nos 0.00 1


ELEC-2.9.1 10 kA - 6-32A range SP MCBs, Nos 8 Nos 0.00 1
b) Labour charges :
Skilled Electrician day 0.50 day 648.00 1
Semi Skilled Electrician day 1.00 day 540.00 1
Helpers day 1.00 day 540.00 1
Sundries, suchas T.W plugs, Screws, LS
Cement etc,

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 2 jobs / day
4.4.6 Supply and fixing TPN - Vertical type
Distribution board with IP - 43 Protection
BLD-ELEC-4-4-6A

(Metal Door) suitable for 3 phase ELCB /


RCCB / FP Isolator as incomer and 10 kA TP
/ SP MCBs as outing going including internal
connection and labour charges for surface /
flush mounting etc., complete.

A Incomer : 63A FP Isolator/ ELCB / RCCB

Outgoing : 32A TP MCBs 2 Nos and 6-


32A SP MCBs 6 Nos
a) Material
ELEC-2.12.23 4way TPN - Vertical type DB with IP-42 Nos 1 Nos 6045.00 1
(Metal Door) protection suitable for 3 Phase
ELCB / RCCB / 4 Pole Isolator as in commer
and TP / SP MCBs as outgoing with Bus-bar
arrangment etc.,
ELEC-2.10.7 63Apms, 4 Pole Isolator / ELCB / RCCB, Nos 1 Nos 890.00 1

ELEC-2.9.13 32A TP MCBs, Nos 2 Nos 0.00 1


ELEC-2.9.1 10 kA - 6-32A range SP MCBs, Nos 6 Nos 201.00 1

b) Labour charges :
Skilled Electrician day 0.50 day 648.00 1
Semi Skilled Electrician day 1.00 day 540.00 1
Helpers day 1.00 day 540.00 1
Sundries, suchas T.W plugs, Screws, LS
Cement etc,

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
BLD-ELEC-4-4-6B

Note : Labour Charges considered for 2 jobs / day


B Incomer : 80A FP Isolator/ ELCB / RCCB

Outgoing : 32A TP MCBs 4 Nos and 6-


32A SP MCBs 12 Nos
a) Material
ELEC-2.12.25 8way TPN - Vertical type DB with IP-42 Nos 1 Nos 9823.00 1
(MD) protection suitable for 3 Phase ELCB /
RCCB / 4 Pole Isolator as in commer and TP
/ SP MCBs as outgoing with Bus-bar
arrangment etc.,
ELEC-2.10.8 100 Apms, 4 Pole Isolator / ELCB / RCCB, Nos 1 Nos 956.00 1

ELEC-2.9.5 32A TP MCBs, Nos 4 Nos 955.00 1

ELEC-2.9.1 10 kA - 6-32A range SP MCBs, Nos 8 Nos 201.00 1


b) Labour charges :
Skilled Electrician day 0.50 day 648.00 1
Semi Skilled Electrician day 1.00 day 540.00 1
Helpers day 1.00 day 540.00 1
Sundries, suchas T.W plugs, Screws, LS
Cement etc,

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 2 jobs / day
4.4.7 Supply and fixing 7 Segment, TPN
Distribution board with IP-42 Protection
(Metal door) with phase segregation and
separation between incoming and outgoing
BLD-ELEC-4-4-7A

suitable for 3 Phase ELCB / RCCB / FP


Isolator as incomer and DP Isolator / RCCB
for phase control with 10kA SP MCCB as
outgoing including internal connection and
labour charges for surface / flush mounting
etc., complete.

A Incomer : 63A FP Isolator/ ELCB /


RCCB
Phase Control : 40A DP Isolator 3
Nos
Outgoing : 10kA 6-32A SP MCBs
12 Nos
a) Material
ELEC-2.12.23 7 Segment, TPN Distribution 4Way DB with Nos 1 Nos 6045.00 1
IP-42 (Metal Door) protection with phase
segregation and seperation between
incomming an outgoing.
ELEC-2.10.7 63Apms, 4 Pole Isolator / ELCB / RCCB, Nos 1 Nos 890.00 1

ELEC-2.10.2 40A DP Isolator, Nos 3 Nos 367.00 1

ELEC-2.9.1 10 kA - 6-32A range SP MCBs, Nos 12 Nos 201.00 1


b) Labour charges :
Skilled Electrician day 0.50 day 648.00 1
Semi Skilled Electrician day 1.00 day 540.00 1
Helpers day 1.00 day 540.00 1
Sundries such as T.W. Plugs, Screws, LS
Cement etc.,

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
BLD-ELEC-4-4-7B

Note : Labour Charges considered for 2 jobs / day


B Incomer : 80A FP Isolator/ ELCB /
RCCB
Phase Control : 63A DP Isolator 3
Nos
Outgoing : 10kA-6-32A SP MCBs
24 Nos
a) Material
ELEC-2.12.33 7 Segment, TPN Distribution 8 Way DB with Nos 1 Nos 9823.00 1
IP-42 (Metal Door) protection with phase
segregation and seperation between
incomming an outgoing.
ELEC-2.10.26 100 Apms, 4 Pole Isolator / ELCB / RCCB, Nos 1 Nos 956.00 1

ELEC-2.10.3 63A DP Isolator, Nos 3 Nos 488.00 1

ELEC-2.9.1 10 kA - 6-32A range SP MCBs, Nos 12 Nos 201.00 1


b) Labour charges :
Skilled Electrician day 1.00 day 648.00 1
Semi Skilled Electrician day 1.00 day 540.00 1
Helpers day 1.00 day 540.00 1
Sundries such as T.W. Plugs, Screws, LS
Cement etc.,

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 2 jobs / day
4.4.8 Supply and fixing TPN - Vertical type
Distribution board with IP -42 Protection
BLD-ELEC-4-4-8

(Metal Door) with 125A, 4Pole 25 kA MCCB


as incomer with 4Nos 32A TP MCBs and 12
Nos. 10 kA SPMCBs as outgoing including
internal connection and labour charges for
surface / flush mounting etc., complete.

a) Material
ELEC-2.12.25 8 Way TPN Vertical DB with IP -42 (Metal Nos 1 Nos 9823.00 1
door) protection suitable for 125A, 4 Pole,
16kA MCCB as incomer.
ELEC-2.8.6 125 Amps, 4 Pole , 25 kA MCCB, Nos 1 Nos 8700.00 1

ELEC-2.9.5 10 kA, 32A TP MCBs: Nos 4 Nos 955.00 1

ELEC-2.9.1 10 kA - 6-32A range SP MCBs, Nos 12 Nos 201.00 1


b) Labour charges :
Skilled Electrician day 1.00 day 648.00 1
Semi Skilled Electrician day 1.00 day 540.00 1
Helpers day 1.00 day 540.00 1
Sundries such as T.W. Plugs, Screws, LS
Cement etc.,

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : 1. Labour Charges considered for 2
jobs / day
2. If the Distribution Boards from Item No.
4.4.1 to 4.4.8 proposed for concealing, add
the following:
a 1No. Semi skilled mason
b 1/4 bag cement
BLD-ELEC-4-4-9 4.4.9 Supply and fixing Distribution board with
20A single phase plug and Socket, in sheet
steel enclosure with 10/16/20A SP MCB
including internal connection and labour
charges for surface / flush mounting etc.,
complete

a) Material
ELEC-2.12.26 1 Phase Distribution board with 20A plug Nos 1 Nos 901.00 1
and socket.
ELEC-2.9.1 10/16/20A SP MCB, Nos 1 Nos 201.00 1

b) Labour charges :
Skilled Electrician Nos 0.25 day 648.00 1
Semi skilled Electrician Nos 0.25 day 540.00 1
Helpers Nos 0.25 day 540.00 1
Sundries such as Cement, Sand, T.W. Plugs, LS
Screws etc.,

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : 1. Labour Charges considered for 4
jobs / day
2. For concealing, add the following:
a 1No. Semi skilled mason
b 1/4 bag cement
4.4.10 Supply and fixing Distribution board with
BLD-ELEC-4-4-10

20A 3 phase plug and Socket, in sheet steel


enclosure with 16/20A TP MCB including
internal connection and labour charges for
surface / flush mounting etc., complete.

a) Material
ELEC-2.12.27 Distribution board with TP. 20A Plug and Each 1 Nos 1700.00 1
Socket .
ELEC-2.9.5 32A TP MCB, 10 kA, Each 1 Nos 955.00 1

b) Labour charges :
Skilled Electrician Nos 0.33 day 648.00 1
Semi skilled Electrician Nos 0.33 day 540.00 1
Helpers Nos 0.33 day 540.00 1
Sundries such as Cement, T.W. Plugs,
Screws etc.,

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : 1. Labour Charges considered for 3
jobs / day
2. For concealing, add the following:
a 1No. Semi skilled mason
b 1/4 bag cement
5 EARTHING - (BLD-ELEC-5)
5.1 EARTHING
5.1.1 Providing independent earthling by
excavating a trench to a depth of 2.1 M in all
BLD-ELEC-5-1-1

soils, as per size specified in the Data, using


40mm dia 'B' class GI pipe of 2.5 Mtrs length
with necessary accessories with hume pipe
ring duly providing staggered holes
including filling with equal proportion of Salt
and Charcoal in layers and all labour
charges etc., complete for small quarters.

a) Material
Earth Work Excavation of Hard gravel Soil cum 0.85 cum 122.30 1
with small boulder for trench 1st step of size
1.5 x 0.6 x 0.9 m (5'x2'x3') - Sump data

Excavation of Hard disteggrated rocks and cum 0.90 cum 620.55 1


boulders for trench 2nd Step of size 1.2 x
0.6 x 1.2 m (Civil SSR) (4'x2'x4') - Sump
data
25% extra for narrow trench & pit and back
filling with Sand, Coke, Salt etc., and
leveling
ELEC-9.1.55 40mm dia 'B' Class G.I pipe, Mtr 2.50 m 355.00 1

ELEC-9.1.44 & 25 x 6 mm (1"X 1/4") G.I Flat duly drilled Each 1 Nos 16.32 1
ELEC-9.1.34
12mm holes (4 Nos) of 200 mm (8") length
(@1.20Kg/Rmt) =0.2x1.2=0.24Kg -
ELEC-9.1.57 Drilling of 16 Nos through holes of 12mm dia Each 16 Nos 6.00 1
to G.I pipe,
ELEC-9.1.58 G.I Nuts, Bolts an Washers, Set 4 Set 11.00 1

ELEC-9.1.59 18" dia hume pipe ring, Each 1 Nos 220.00 1

ELEC-9.1.9 Hard Coke, Kg 40 Kg 15.00 1

ELEC-9.1.10 Salt, Kg 20 Kg 10.00 1

b) labour charges for fixing pipe ring and Each


connections
Semi skilled Electrician Nos 0.5 day 540.00 1
Helpers Nos 0.5 day 540.00 1
Sundries

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
5.1.2 Providing independent earthing for Important
equipment with 40mm dia 'B' class 2.5m
long G.I pipe and 19mm dia 'B' class G.I
pipe of 0.3mtr. long connected with reducer
providing G.I funnel with mesh enclosed in
C.C.Chamber of 400m x 400m x 400mm
BLD-ELEC-5-1-2

with R.C.C. Slab cover duly providing


staggered holes filling with salt and charcoal
from the bottom of the pipe giving earth
connection from electrode through G.I strip
of 25 x 6mm x 200mm length with all
accessories and labour charges complete,
as per IS specifications 732/1982 (Part II)

a) Material
Earth work excavation of hard gravel soil cum 1.27 cum 122.30 1
with small boulders for trench 1st step of
size 1.5 x 0.9 x 0.9 m (5'x3'x3')
Earth work hard disintegrated rock and cum 1.87 cum 620.55 1
boulders for trench 2nd Step of size 1.2 x
0.9 x 1.65 m (Civil SSR-16) (4'x3'x5.5')
25% extra for trenches and narrow Pit, back
filling and blending.
Laying C.C bed in Cement mortar with 1: 2:4 cum 0.90 cum 4352.74 1
with 20 mm HBG Stone Metal (Civil SSR).

Bld Upto 3 f Masonary through with brick Masonry with cum 0.23 cum 3526.80 1
5.1.39
CM 1:3
Mortars Cement plastering inside through with 1:3 sqm 2.09 Sqm 3487.19 10
Cement mortar, 12 mm thick (Civil SSR).
ELEC-9.1.55 40mm dia G.I pipe Class 'B' (Civil SSR), Mtr 2.50 m 355.00 1
ELEC-8.1.62
BMW-F.81 20.mm dia G.I pipe, Mtr 0.30 m 192.00 1
40mm x 19mm reducer (Pudu SSR ) Each 1.00 Nos 63.00 1
ELEC-9.1.28 G.I Funel covered with wire mesh, ELEC- Each 1.00 Nos 83.00 1
8.1.36
ELEC-9.1.44 & 25mm x 6mm x 200 mm length G.I Strip Each 1.00 Nos 16.32 1
ELEC-9.1.34
(Flat) with 4 Nos. Holes of 12mm dia.
ELEC-9.1.57 Drilling of staggered holes of 12mm dia to Each 16.00 Nos 6.00 1
G.I pipe.
G.I Bolts, Nuts and Washers.BMS- Set 4.00 Set 11.00 1
W.63,BMS-W.65
ELEC-9.1.9 Hard Coke, kg 4.00 Kg 15.00 1
ELEC-9.1.10 Salt, kg 20.00 Kg 10.00 1
Cost Iron cover 400 mm x 400mm x 50mm. L.S 1 Nos 400.00 1

b) labour charges for fixing pipe


Skilled Electrician Nos 1.00 Nos 648.00 1
Sundries such as Lugs and Saddles

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
5.1.3 Providing independent earthing for
Sophisticated Electronic equipment with
600mm x 600mm x 3.15mm thick copper
plate rigidly fixed to 40mm dia G.I Pipe of
0.3mtr. length connected with reducer
BLD-ELEC-5-1-3

providing G.I funnel with wiremesh as per


National Electric Code including
C.C.Chamber of size 400m x 400m x
400mm covered with R.C.C. Slab filling with
salt and charcoal giving earth connection
from electrode G.I strip of 25mm x 6mm x
200mm length with all accessories and
labour charges complete as per IS
specification 732/1982 (Part II).

a) Material
Earth work excavation of hard gravel soil cum 1.27 cum 122.30 1
with small boulders for trench 1st step of
size 1.5 x 0.9 x 0.9 m (5'x3'x3')
Earth work hard disintegrated rock and cum 1.87 cum 620.55 1
boulders for trench 2nd Step of size 1.2 x
0.9 x 1.65 m (Civil SSR-16) (4'x3'x5.5')
25% extra for trenches and narrow Pit, back
filling and blending.
Laying C.C bed in Cement mortar with 1: 2:4 cum 0.90 cum 4352.74 1
with 20 mm HBG Stone Metal (Civil SSR).

Masonary through with brick Masonry with cum 0.23 cum 3526.80 1
CM 1:3
Cement plastering inside through with 1:3 sqm 2.09 Sqm 3487.19 10
Cement mortar, 12 mm thick (Civil SSR).
ELEC-9.1.55 40mm dia G.I pipe Class 'B' (Civil SSR), Mtr 2.50 m 355.00 1
19mm dia G.I pipe, BMW-F.81 Mtr 0.30 m 192.00 1
(Pudu SSR ) 40mm x 19mm reducer Each 1.00 Nos 63.00 1
ELEC-9.1.28 G.I Funel covered with wire mesh, Each 1.00 Nos 83.00 1
ELEC-9.1.44 & E25mm x 6mm x 200 mm length G.I Strip Each 1.00 Nos 16.32 1
(Flat) with 4 Nos. Holes of 12mm dia.-
ELEC-9.1.34 600mm x600mm x 3.15mm thick copper kg 10.00 Kg 605.00 1
plate,
ELEC-9.1.57 Drilling of staggered holes of 12mm dia to Each 16.00 Nos 6.00 1
G.I pipe.
G.I Bolts, Nuts and Washers.BMS- Set 4.00 Set 11.00 1
W.63,BMS-W.65
ELEC-8.1.16 Hard Coke, kg 4.00 Kg 15.00 1
ELEC-8.1.17 Salt, kg 20.00 Kg 10.00 1
Cost Iron cover 400 mm x 400mm x 50mm. L.S 1 Nos 400.00 1

b) labour charges for fixing pipe


Skilled Electrician Nos 1 Nos 648.00 1
Sundries such as Lugs and Saddles

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
5.2 G.I Wire and Strip
BLD-ELEC-5-2-1
BLD-ELEC-5-2-1
5.2.1 Supply and Run of No.8 SWG G.I wire 100 m
including cost of all accessories and labour
charges etc., complete.
a) Material
ELEC-9.1.39 No.8 SWG G.I wire 100 M Length (0.104 Kg 10.40 Kg 68.00 1
Kg / Mtr) -
ELEC-9.1.3 U' Nails, 100Nos 150.00 Nos 44.00 100

b) labour charges
Helpers day 2 day 540.00 1
Sundries.
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
5.2.2 Supply and Run of No.10 SWG G.I wire 100 m
BLD-ELEC-5-2-2

including cost of all accessories and labour


charges etc., complete.
a) Material
ELEC-8.1.45 No.10 SWG G.I wire 100 M Length (0.067 Kg 6.70 Kg 68.00 1
Kg / Mtr)--
U' Nails 100Nos 150 Nos 44.00 100
b) labour charges
Helpers day 2 day 540.00 1
Sundries.
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
5.2.3 Supply and Run of No.12 SWG G.I wire 100 m
BLD-ELEC-5-2-3

including cost of all accessories and labour


charges etc., complete.
a) Material
-ELEC-8.1.45 No.12 SWG G.I wire 100 M Length (0.044 Kg 4.40 Kg 68.00 1
Kg / Mtr)
U' Nails 100Nos 150 Nos 44.00 100
b) labour charges
Helpers day 2 day 540.00 1
Sundries.
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
5.2.4 Supply and Run of No.14 SWG G.I wire 100 m
BLD-ELEC-5-2-4

including cost of all accessories and labour


charges etc., complete.
a) Material
ELEC-8.1.45 No.14 SWG G.I wire 100 M Length (0.026 Kg 2.60 Kg 68.00 1
Kg / Mtr)--
BLD-ELEC
U' Nails 100Nos 150 Nos 44.00 100
b) labour charges
Helpers day 2 day 540.00 1
Sundries.
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
5.2.5 Supply and Run of 25mm x 6mm G.I Strip 100 m
BLD-ELEC-5-2-5

including cost of all accessories and labour


charges etc., complete.
a) Material
ELEC-8.1.45 25mm x 6mm G.I Strip 100 M Length (1.18 kg 118 Kg 68.00 1
Kg / Mtr) -
b) labour charges
Skilled Electrician Nos 2 day 648.00 1
Helper Nos 2 day 540.00 1
Sundries such as T&P.
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
5.2.6 Supply and Run of 40mm x 6mm G.I Strip 100 m
including cost of all accessories and labour
charges etc., complete
a) Material
BLD-ELEC-5-2-6

ELEC-8.1.45 40mm x 6mm G.I Strip 100 M Length (1.88 kg 188 Kg 68.00 1
Kg / Mtr) -
b) labour charges
Skilled Electrician Nos 2 day 648.00 1
Helper Nos 2 day 540.00 1
Sundries such as T&P.
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
5.2.7 Supply and Run of 50mm x 6mm G.I Strip 100 m
BLD-ELEC-5-2-7

including cost of all accessories and labour


charges etc., complete.
a) Material
ELEC-8.1.45 50mm x 6mm G.I Strip 100 M Length (2.36 kg 236 Kg 68.00 1
Kg / Mtr),
b) labour charges
Skilled Electrician Nos 2 day 648.00 1
Helper Nos 2 day 540.00 1
Sundries such as T&P.
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
5.3 Copper wire and Strip
BLD-ELEC-5-3-1

5.3.1 Supply and Run of Zero gauge copper wire 100 m


including cost of all accessories and labour
charges etc., complete
a) Material
ELEC-9.1.38 O' SWG Copper wire (0.455 Kg/Mtr.) 100 M Kg 45.5 Kg 701.00 1
Length,
b) labour charges
Skilled Electrician Nos 1 Nos 648.00 1
Semi skilled Electrician Nos 1 Nos 540.00 1
Helper Nos 1 Nos 540.00 1
Sundries such as T&P and rounding off
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
5.3.2 Supply and Run of No. 8 SWG copper wire 100 m
BLD-ELEC-5-3-2

including cost of all accessories and labour


charges etc., complete.
a) Material
ELEC-8.1.41 8 SWG Copper wire (0.1155 Kg/Mtr.) 100 M Kg 11.55 Kg 701.00 1
Length,
b) labour charges
Skilled Electrician Nos 1 Nos 648.00 1
Semi skilled Electrician Nos 1 Nos 540.00 1
Helper Nos 1 Nos 540.00 1
Sundries such as T&P and rounding off
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
5.3.3 Supply and Run of No. 14 SWG copper wire 100 m
BLD-ELEC-5-3-3

including cost of all accessories and labour


charges etc., complete
a) Material
ELEC-9.1.37 14 SWG Copper wire (0.028 Kg/Mtr.) 100 M Kg 2.80 Kg 605.00 1
Length,
b) labour charges
Skilled Electrician Nos 1 Nos 648.00 1
Semi skilled Electrician Nos 1 Nos 540.00 1
Helper Nos 1 Nos 540.00 1
Sundries such as T&P and rounding off
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
BLD-ELEC-5-3-4 5.3.4 Supply and Run of 25mm x 3mm copper 100 m
strip including cost of all accessories and
labour charges etc., complete.
a) Material
ELEC-9.1.34 25mmx 3mm Copper strip (0.663 Kg / Mtr) Kg 66.30 Kg 605.00 1
100 M Length -
b) labour charges
Skilled Electrician Nos 2 Nos 540.00 1
Helper Nos 2 Nos 540.00 1
Sundries and rounding off
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
5.3.5 Supply and Run of 32mm x 6mm copper LS 100 m
BLD-ELEC-5-3-5

strip including cost of all accessories and


labour charges etc., complete.
a) Material
ELEC-8.1.40 32mmx 6mm Copper strip (1.697 Kg / Mtr) Kg 169.70 Kg 605.00 1
100 M Length -
b) labour charges
Skilled Electrician Nos 2 Nos 540.00 1
Helper Nos 2 Nos 540.00 1
Sundries and rounding off
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
6
SERVICE MAINS & LTOH Lines- (BLD-
ELEC-6)
6.1 WPSC (Weather Prrof Single Core)
(PVC Cleats)
BLD-ELEC-6-1-1

6.1.1 Supply and Run of 2 of 2.5 Sq.mm WPSC 100 m


(Whether Proof Single Core) Aluminium
cable along with No.10 SWG G.I bearer wire
through PVC cleats with all accessories
including labour charges etc., complete for
service mains.

a) Material
ELEC-1.6.1 2.5 Sq.mm WPSC Aluminium cable, 100 M 200 m 737.00 100

ELEC-9.1.39 No.10 SWG G.I wire. (0.026 Kg / Mtr) Length kg 6.70 Kg 68.00 1
100 RM,
ELEC-9.1.11 PVC Cleats, 100 Nos 100 Nos 330.00 100

b) labour charges
Skilled Electrician day 1 Nos 648.00 1
Semi skilled day 1 Nos 540.00 1
Helper day 1 Nos 540.00 1
Sundries such as insulation tapes and
rounding off
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
6.1.2 Supply and Run of 2 of 6 Sq.mm WPSC 100 m
Aluminium cable along with No.10 SWG G.I
bearer wire through PVC cleats with all
BLD-ELEC-6-1-2

accessories including labour charges etc.,


complete for service mains.
a) Material
ELEC-1.6.2 6 Sq.mm WPSC Aluminium cable, 100 M 200 m 1497.00 100

ELEC-9.1.39 No.10 SWG G.I wire. (0.026 Kg / Mtr) Length kg 6.70 Kg 68.00 1
100 RM,
ELEC-9.1.11 PVC Cleats, 100 Nos 100 Nos 330.00 100
b) labour charges
Skilled Electrician day 1 Nos 648.00 1
Semi skilled day 1 Nos 540.00 1
Helper day 1 Nos 540.00 1
Sundries such as insulation tapes and
rounding off
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
6.1.3 Supply and Run of 2 of 10 Sq.mm WPSC 100 m
Aluminium cable along with No.10 SWG G.I
bearer wire through PVC cleats with all
BLD-ELEC-6-1-3

accessories including labour charges etc.,


complete for service mains.
a) Material
ELEC-1.6.3 10 Sq.mm WPSC Aluminium cable, 100 M 200 m 1611.00 100

ELEC-9.1.39 No.10 SWG G.I wire. (0.026 Kg / Mtr )Length kg 6.7 Kg 68.00 1
100 RM,
ELEC-9.1.11 PVC Cleats, 100 Nos 100 Nos 330.00 100
b) labour charges
Skilled Electrician day 1 Nos 648.00 1
Semi skilled day 1 Nos 540.00 1
Helper day 1 Nos 540.00 1
Sundries such as insulation tapes and
rounding off
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
6.1.4 Supply and Run of 4 of 6 Sq.mm WPSC 100 m
Aluminium cable along with No.10 SWG G.I
bearer wire on both sides through PVC
BLD-ELEC-6-1-4

cleats with all accessories including labour


charges etc., complete for service mains.

a) Material
ELEC-1.6.2 6 Sq.mm WPSC Aluminium cable, 100 M 400 m 1497.00 100
ELEC-9.1.39 No.10 SWG GI Wire (6.7kg x 2) Length 200 kg 13.4 Kg 68.00 1
RM,
ELEC-9.1.13 Binding wire, kg 0.25 Kg 61.00 1

ELEC-9.1.12 PVC Cleats / Separters 4 W. 100 Nos 100 Nos 440.00 100

b) labour charges
Skilled Electrician day 2 Nos 648.00 1
Semi skilled day 2 Nos 540.00 1
Helper day 2 Nos 540.00 1
Sundries such as insulation tapes and
rounding off
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
6.1.5 Supply and Run of 4 of 10 Sq.mm WPSC 100 m
Aluminium cable along with No.10 SWG G.I
bearer wire on both sides through PVC
BLD-ELEC-6-1-5

cleats with all accessories including labour


charges etc., complete for service mains.

a) Material
ELEC-1.6.3 10 Sq.mm WPSC Aluminium cable 100 M 400 m 1611.00 100

ELEC-9.1.39 No.10 SWG GI Wire (6.7kg x 2) Length 200 kg 13.4 Kg 68.00 1


RM,
ELEC-9.1.13 Binding wire, kg 0.25 Kg 61.00 1
ELEC-9.1.12 PVC Cleats / Separters 4 W. 100 Nos 100 Nos 440.00 100
b) labour charges
Skilled Electrician day 2 Nos 648.00 1
Semi skilled day 2 Nos 540.00 1
Helper day 2 Nos 540.00 1
Sundries such as insulation tapes and
rounding off
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
6.1.6 Supply and Run of 4 of 16 Sq.mm WPSC 100 m
BLD-ELEC-6-1-6

Aluminium cable along with No.10 SWG G.I


bearer wire through PVC cleats with all
accessories including labour charges etc.,
complete for service mains.
a) Material
ELEC-1.6.4 16 Sq.mm WPSC Aluminium cable, 100 M 400 m 2693.00 100

ELEC-9.1.39 No.10 SWG GI Wire (6.7kg x 2) Length 200 kg 13.40 Kg 68.00 1


RM,
ELEC-9.1.13 Binding wire, kg 0.25 Kg 61.00 1
ELEC-9.1.12 PVC Cleats / Separters 4 W. 100 Nos 100 Nos 440.00 100
b) labour charges
Skilled Electrician day 2 Nos 648.00 1
Semi skilled day 2 Nos 540.00 1
Helper day 2 Nos 540.00 1
Sundries such as insulation tapes and
rounding off
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
6.2 WPTC (Weather Prrof Twin Core)
BLD-ELEC-6-2-1

Cable
6.2.1 Supply and Run of 1 of 6 Sq.mm WPTC 100 m
Aluminium cable along with No.10 SWG G.I
bearer wire through PVC cleats with all
accessories including labour charges etc.,
complete.
a) Material
ELEC-1.6.5 6 Sq.mm (7/18) wptc Aluminium cable, 100 M 100 m 3017.00 100

ELEC-9.1.39 No.10 G.I wire. Length 100 RM, 5 kg 6.70 Kg 68.00 1


ELEC-9.1.14 Insulation tapes, each 2 Nos 17.00 1
ELEC-9.1.4 Aluminium link clips, (144 Nos Box) box 2 Nos 55.00 1
b) labour charges
Skilled Electrician day 1 Nos 648.00 1
Semi skilled day 1 Nos 540.00 1
Helper day 1 Nos 540.00 1
Sundries and rounding off
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
6.2.2 Supply and Run of 1 of 10 Sq.mm WPTC 100 m
BLD-ELEC-6-2-2

Aluminium cable along with No.10 SWG G.I


bearer wire through PVC cleats with all
accessories including labour charges etc.,
complete.
a) Material
ELEC-1.6.6 10 Sq.mm (7/18) wptc Aluminium cable, 100 M 100 m 3629.00 100

ELEC-9.1.39 No.10 G.I wire. Length 100 RM, kg 6.70 Kg 68.00 1


ELEC-9.1.14 Insulation tapes, each 2 Nos 17.00 1
ELEC-9.1.4 Aluminium link clips, (144 Nos Box) box 2 Nos 55.00 1
b) labour charges
Skilled Electrician day 1 Nos 648.00 1
Semi skilled day 1 Nos 540.00 1
Helper day 1 Nos 540.00 1
Sundries and rounding off
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
6.2.3 Supply and Run of 2 of 6 Sq.mm WPTC 100 m
BLD-ELEC-6-2-3

Aluminium cable along with No.10 SWG G.I


bearer wire through PVC cleats with all
accessories including labour charges etc.,
complete.
a) Material
ELEC-1.6.5 6 Sq.mm (7/18) wptc Aluminium cable, 100 M 200 m 3017.00 100

ELEC-9.1.39 No.10 G.I wire. Length 100 RM, kg 6.70 Kg 68.00 1


ELEC-9.1.14 Insulation tapes, each 4 Nos 17.00 1
ELEC-9.1.4 Aluminium link clips(144 Nos Box) box 2 Nos 55.00 1
b) labour charges
Skilled Electrician day 1 Nos 648.00 1
Semi skilled day 1 Nos 540.00 1
Helper day 1 Nos 540.00 1
Sundries and rounding off
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
6.2.4 Supply and Run of 2 of 10 Sq.mm WPTC 100 m
BLD-ELEC-6-2-4

Aluminium cable along with No.10 SWG G.I


bearer wire through PVC cleats with all
accessories including labour charges etc.,
complete
a) Material
ELEC-1.6.6 10 Sq.mm (7/18) wptc Aluminium cable, 100 M 200 m 3629.00 100

ELEC-9.1.39 No.10 G.I wire. Length 100 RM, kg 6.7 Kg 68.00 1


ELEC-9.1.14 Insulation tapes, each 4 Nos 17.00 1
ELEC-9.1.4 Aluminium link clips, (144 Nos Box) box 2 Nos 55.00 1
b) labour charges
Skilled Electrician day 1 Nos 648.00 1
Semi skilled day 1 Nos 540.00 1
Helper day 1 Nos 540.00 1
Sundries and rounding off
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre = C/100
6.2.5 Supply and Run of 2 of 16 Sq.mm WPTC 100 m
BLD-ELEC-6-2-5 Aluminium cable along with No.10 SWG G.I
bearer wire through PVC cleats with all
accessories including labour charges etc.,
complete.
a) Material
ELEC-1.6.4 16 Sq.mm (7/18) wptc Aluminium cable, 100 M 200 m 2693.00 100

ELEC-9.1.39 No.10 G.I wire. Length 100 RM, kg 6.7 Kg 68.00 1


ELEC-9.1.14 Insulation tapes, each 4 Nos 17.00 1
ELEC-9.1.4 Aluminium link clips (144 Nos Box) box 2 Nos 55.00 1
b) labour charges
Skilled Electrician day 1 Nos 648.00 1
Semi skilled day 1 Nos 540.00 1
Helper day 1 Nos 540.00 1
Sundries and rounding off
C) Cost for 100 RM
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total

Rate per Metre = C/100


6.3 L.T.O.H. Lines
BLD-ELEC-6-3-1

6.3.1 Supply and fixing of 3 phase, 4 wire angle


iron cross arm with 3 Nos shackle / pin
insulators for phases and C.I knob for
neutral including cost and conveyance of all
materials.
a) Material
ELEC-9.1.24 Angle Iron 38 x 38 x 6 mm (1.5"x1.5"x1/4"), kg 4.27 kg 250.00 1

ELEC-9.1.57 Drilling Holes, each 6 Nos 6.00 1

ELEC-9.1.17 M.S Clamp 25mm x 6mm with bolts and each 1 Nos 200.00 1
nuts,
ELEC-7.15.5 Pin insulators 100 x 80 mm (4"x3 1/2"), each 3 Nos 90.00 1

ELEC-9.1.15 C.I Nob, each 1 Nos 25.00 1

Cutting of angle Iron and Welding including LS


cost of flat Iron etc.,
b) labour charges
Skilled Electrician day 0.125 day 648.00 1
Semi skilled day 0.125 day 540.00 1

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : 1. Labour Charges considered for 8
jobs / day
6.3.2 Supply and fixing of single phase, 2 wire
BLD-ELEC-6-3-2 angle iron cross arm with 1 Nos shackle / pin
insulators for phases and C.I knob for
neutral including cost and conveyance of all
materials.
a) Material
ELEC-8.1.31 Angle Iron 38 x 38 x 6 mm (1.5"x1.5"x1/4" kg 2.13 kg 250.00 1
(0.61 mt),
ELEC-8.1.63 Drilling Holes, each 4 Nos 6.00 1
ELEC-8.1.24 M.S Clamp 25mm x 6mm with bolts and each 1 Nos 200.00 1
nuts,
ELEC-6.5.5 Pin insulators 100 x 80 mm (4"x3 1/2"), each 1 Nos 90.00 1
ELEC-8.1.22 C.I Nob, each 1 Nos 25.00 1
Cutting of angle Iron and Welding including LS
cost of flat Iron sundires.
b) labour charges
Skilled Electrician day 0.10 day 648.00 1
Semi skilled day 0.10 day 540.00 1

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : 1. Labour Charges considered for 10
jobs / day
6.3.3 Supply and fixing of stayset with 7/8 SWG
BLD-ELEC-6-3-3

(10to 15m long) guy insulator with concreting


1:3:6 incluidng excavation of pit and back
filling including cost and conveyance of all
materials and labolur charges etc., complete.

a) Material
ELEC-9.1.17 Stay rod of 16mm dia (7/8 SWG) 1560mm each 1 Nos 200.00 1
length with bolts and nuts with switch plate.

ELEC-9.1.16 Stay tight set (Jum Bracket 300mm), pair 1 Pair 300.00 1

Stay wire 7/20 weighing 4kgs each 1


Bld upto 3f Cement Concrete 1:3:6 (As per Civil SSR) cum 0.142 Cum 3427.06 1
3.10.27
Excavation of pit and back filling 1.5 x 0.75 x cum 0.675 Cum 122.30 1
0.6 m (5'x2.5'x2')
ELEC-9.1.17 Stay clamp with bolts and nuts, set 1 Nos 200.00 1

ELEC-9.1.18 L.T guy insulator, each 1 Nos 75.00 1

b) labour charges
Skilled Electrician. day 0.5 Nos 648.00 1
Man Mazdoor day 1 Nos 540.00 1

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : 1. Labour Charges considered for 2
jobs / day
6.3.4 Supply and fixing of over head line
horizontal type safety device with angle iron
BLD-ELEC-6-3-4

cross arm of size 50 x 50 x 6 mm, 1.52m


length projection from pole with 38 x 38 x 6
mm (1 1/2"x1 1/2" x 1/4") angle iron arm
including G.I wire for earth continuity and
cost of all accessories labour charges etc.,
complete.

a) Material
ELEC-8.1.32 50 x 50 x 6 mm (2"x2"x1/4") Angle Iron of kg 5.32 kg #REF! 1
1.52 Mtr length,
38 x 38 x 6 mm (1.5"x1.5"x1/4") Angle Iron kg 1.57 kg #REF! 1
of 0.45 Mtr
Special Flat Iron Clamp 25x6mm with bolts each 1 Nos 200.00 1
and nuts, ELEC-8.1.24
ELEC-8.1.45 No.8 SWG G.I wire 8m Length, kg 0.80 kg #REF! 1
b) labour charges
Skilled Electrician day 0.25 day 648.00 1
Semi skilled day 0.25 day 540.00 1
Helper day 0.50 day 540.00 1
Sundires such as bolts, nuts including
soldering.

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : 1. Labour Charges considered for 4
jobs / day
6.3.5 OH Conductors
6.3.5 (a) Supply and erecting 7/2.00 AAAC (All
BLD-ELEC-6-3-5

Aluminium Annealed Conductor) / Squirrel


(20 Sq.mm) conductor for Overhead line
with stringing, binding and suitable size of
clamps for Jumpering etc., complete
a) Material
ELEC-6.5.12 7/2.0 AAAC (Squirrel), km 1000 m #REF! 1000
7/2.0 AAAC for binding and Jumpering. km 100 m 14243.00 1000
ELEC-8.1.24 Aluminium Clamps, each 10 Nos #REF! 1
b) labour charges
Skilled Electrician day 2 day 648.00 1
Helper day 8 day 540.00 1
For special T&P LS
Sundires and rounding off

add for over heads @ 14%


Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per km
BLD-ELEC-6-3-5B
6.3.5 (b) Supply and erecting 7/2.50 AAAC / Weasel
(34 Sq.mm) conductor for Overhead line with
stringing, binding and suitable size of clamps
for Jumpering etc., complete.

a) Material
ELEC-7.15.11 7/2.5 AAAC / Weasel (34 Sq.mm), km 1000 m 15383.00 1000

ELEC-6.5.12 7/2.5 AAAC for binding and Jumpering. km 100 m 15383.00 1000
ELEC-9.1.17 Aluminium Clamps, each 10 Nos 200.00 1

b) labour charges
Skilled Electrician day 2 day 648.00 1
Helper day 8 day 540.00 1
For special T&P LS
Sundires and rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per km
BLD-ELEC-6-3-5C

6.3.5 (c) Supply and erecting 7/3.15 AAAC / Rabbit


(55 Sq.mm) conductor for Overhead line with
stringing, binding and suitable size of clamps
for Jumpering etc., complete.
a) Material
ELEC-7.15.10 7/3.15 AAAC / Rabbit (55 Sq.mm), km 1000 m 25013.00 1000

7/3.15 AAAC for binding and Jumpering. km 100 m 25013.00 1000


ELEC-9.1.17 Aluminium Clamps, each 10 Nos 200.00 1
b) labour charges
Skilled Electrician day 2 day 648.00 1
Helper day 8 day 540.00 1
For special T&P LS
Sundires and rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per km
BLD-ELEC-6-3-6

6.3.6 Supply and erecting of fibre / PVC spacers


for L.T Overhead line of 3 to 5 conductors.

a) Material
PVC spacer suitable for 3 to 5 conductos. each 1 1
b) labour charges
Helper day 0.2 #REF! 1
Special T&P. LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per km
Note : 1. Labour Charges considered for 5 jobs / day
BLD-ELEC-6-3-7 6.3.7 Excavation of hard rock or Bituminous road
(BT) by chiselling for preparing pit for poles /
stay / earth plates / laying pipes, including
clearing the site by removing debris and
making the site to original position.

a) Material
Cutting B.T road surface (As per Civil SSR) cum 1 cum 518.00 1

Excavation of WBM under B.T cum 1 cum 1

Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
BLD-ELEC-6-3-8A

Note : Rate shall be as per Civil SSR


6.3.8 (a) Brick Masonry in CM (1:6) with country
Bricks traditional size 23 x 11 x 7 cms
Unit = 1cum
a) Material
ELEC-9.1.52 Bricks traditional size 23 x 11 x 7 cms 2nd Nos 512 3819.00 1,000
class
Cement Mortar 1:6 cum 0.20 2095.19 1
b) labour charges
Mason 1st class day 0.24 Err:509 1
Mason 2nd class day 0.56 Err:509 1
Mazdoor (unskilled) day 1.88 Err:509 1
Scaffolding charges
Add 25% extra on labour for isolated work
Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
BLD-ELEC-6-3-8B

Rate per cum


6.3.8 (b) Plastering with CM (1:5), 12 mm thick
Unit = 10 sqm
a) Material
Cement Mortor (1:5) cum 0.15 2373.59 1
b) labour charges
Mason 1st class day 0.6 #REF! 1
Mazdoor (unskilled) day 0.96 #REF! 1
Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
BLD-ELEC-6-3-8C

Total
Rate per cum
6.3.8 (c) CRS Masonry in CM (1:6) 2nd Sort
Unit = 1cum
a) Material
Coursed Rubble Stone cum 0.94 18.00 1
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = cum 0.16
0.16cum
Cement Mortar 1:6 cum 0.32 2095.19 1
b) labour charges
Mason 1st class day 0.45 #REF! 1
Mason 2nd class day 1.05 #REF! 1
Mazdoor (unskilled) day 2.32 Err:509 1
Add 25% extra on labour for isolated work
Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per cum
6.3.9 (a) Supply Transportation and unloading the
BLD-ELEC-6-3-9A

9.1mtr long PSCC poles with 300kg working


load at site in good condition for H.T. / L.T.
lines support including cost and conveyance
of all materials and labour charges etc.,
complete.

a) Material
9.1 Mtr PSCC pole of 300 Kg working load each 1 0
Transportation Charges @ 5% of Cost
Helper for Unloading day 0.5 540.00 1
Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : 1. Unloading Charges considered for 12 jobs / 6
6.3.9 (b) Helpers
Supply /Transportation
day and unloading the
BLD-ELEC-6-3-9B

9.1mtr long PSCC poles with 280kg working


load at site in good condition for H.T. / L.T.
lines support including cost and conveyance
of all materials and labour charges etc.,
complete.

a) Material
ELEC-7.15.12 9.1 Mtr PSCC pole of 280 Kg working load each 1 3129.00 1

Transportation Charges @ 5% of Cost


Helper for Unloading day 0.5 540.00 1
Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : 1. Unloading Charges considered for 12 jobs / 6
6.3.9 (c) Helpers /Transportation
Supply day and unloading the
BLD-ELEC-6-3-9C

8.0mtr long PSCC poles with 200kg working


load at site in good condition for H.T. / L.T.
lines support including cost and conveyance
of all materials and labour charges etc.,
complete.

a) Material
8 Mtr PSCC pole of 200 Kg working load each 1 1665.00 1
Transportation Charges @ 5% of Cost
Helper for Unloading day 0.5 540.00 1
Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : 1. Unloading Charges considered for 12 jobs / 6
Helpers / day
6.3.9 (d) Supply, Transportation and unloading the
BLD-ELEC-6-3-9D 8.0mtr long PSCC poles with 140kg working
load at site in good condition for H.T. / L.T.
lines support including cost and conveyance
of all materials and labour charges etc.,
complete.

a) Material
ELEC-7.15.13 8 Mtr PSCC pole of 140 Kg working load each 1 1665.00 1

Transportation Charges @ 5% of Cost


Helper for Unloading day 0.5 540.00 1
Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : 1. Unloading Charges considered for 12 jobs / 6
6.3.10 (a) Helpers / day
Supply Transportation and unloading the RS
BLD-ELEC-6-3-10A

Joist of 9.0 mtr long 175mm x 85mm size at


site in good condition for H.T. / L.T. lines
support including cost and conveyance of all
materials and labour charges etc., complete.

a) Material
ELEC-7.15.14 175mm x 85mm, 9.0 Mtr long R.S.Joist (1mt kg 176.4 50.00 1
= 19.6 Kg)
Transportation Charges @ 5% of Cost
Helper for Unloading day 0.33 540.00 1
Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : 1. Unloading Charges considered for 20 jobs / 6
6.3.10 (b) HelpersTransportation
Supply / day and unloading the RS
BLD-ELEC-6-3-10B

Joist of 8.0 mtr long 150mm x 75mm size at


site in good condition for H.T. / L.T. lines
support including cost and conveyance of all
materials and labour charges etc., complete.

a) Material
ELEC-7.15.14 150mm x 75mm, 8.0 Mtr long R.S.Joist (1mt kg 120 50.00 1
= 15.0 Kg)
Transportation Charges @ 5% of Cost
Helper for Unloading day 0.33 540.00 1
Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : 1. Unloading Charges considered for 20 jobs / 6
7 Helpers
STREET/ day
LIGHT LUMINARIES (BLD-ELEC-
7)
7.1 FLOURESCENT LUMINAIRE
BLD-ELEC-7-1-1 7.1.1 Supply of 1x40W weatherproof flourescent
streetlight fitting comprising canopy of sheet
Aluminium in stove enamel finish with
copper / VPIT ballast, capacitor, tube and
starter etc., complete.
a) Material
ELEC-3.1.1 1x40W WP flourscent street light fitting. each 1 1260.00 1

ELEC-3.7.4 Lamp cost of 40W each 1 45.00 1

Sundries and rounding off


Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
BLD-ELEC-7-1-2

7.1.2 Supply of 2x36W CFL (Compacted


Flourescent Lamp), Street light fitting with all
standard accessories and 2 Nos 11W CFL,
Lamp etc., complete.
a) Material
ELEC-3.6.9 2x36W CFL street light fitting. each 1 3749.00

ELEC-3.7.12 Cost of 11W CFL each 1 135.00

Sundries and rounding off


add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total

Rate per each


BLD-ELEC-7-1-3

7.1.3 Supply of 1x18W CFL, Street light fitting


with all standard accessories and 1 No 18W
CFL lamp etc., complete.
a) Material
1x18W CFL street light flourscent fitting. each 1 750.00
ELEC-3.7.10 Lamp cost of 1x18W CFL each 1 115.00

Sundries and rounding off


add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
7.2 Mercury Vapour (M.V.) LUMINAIRE
BLD-ELEC-7-2-1

7.2.1 Supply of single piece die cast Aluminium


body with 80W mercury vapour luminaire
with copper wound ballast and capacitor
including 80W M.V.Lamp etc., complete.
a) Material
ELEC-3.3.2 80W MV Lamp fitting single piece die cast each 1 643.00 1
Aluminium body with copper wound ballast
and capacitor
ELEC3.4.38 80W MV lamp each 1 #REF! 1
Sundries and rounding off
Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
7.2.2 Supply of single piece die cast Aluminium
BLD-ELEC-7-2-2

body with 125W M.V. luminaire with copper


wound ballast and capacitor including 125W
HPMV lamp etc., complete.

a) Material
ELEC-3.3.4 125W MV Lamp fitting single piece die cast each 1 652.00 1
Aluminium body with copper wound ballast
and capacitor
ELEC3.4.41 125W MV lamp each 1 #REF! 1
Sundries and rounding off
Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
7.3 High Pressure Sodium Vapour (S.V.)
LUMINAIRE
7.3.1 Supply of Integral street light luminaire of
BLD-ELEC-7-3-1

70W HPSV lamp fitting comprises of single


piece die cast Aluminium body with copper
wound ballast and capacitor, Ignitor, with
pot optics including 70W HPSV lamp etc.,
complete.

a) Material
ELEC-3.1.4 70W HPSV Lamp fitting single piece die cast each 1 2570.00 1
Aluminium body with copper wound ballast
and capacitor, Ignitor, with pot optics

ELEC-3.4.6 70W HPSV lamp each 1 400.00 1

Sundries and rounding off


add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
7.3.2 Supply of Integral street light luminaire of
BLD-ELEC-7-3-2

150W HPSV lamp fitting comprises of single


piece die cast Aluminium body with copper
wound ballast and capacitor, Ignitor, with
pot optics including 150W HPSV lamp etc.,
complete.

a) Material
ELEC-3.1.14 150W HPSV Lamp fitting single piece die each 1 #REF!
cast Aluminium body with copper wound
ballast and capacitor, Ignitor, with pot optics

156W HPSV lamp each 1


Sundries and rounding off
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
7.3.3 Supply of Integral street light luminaire of
BLD-ELEC-7-3-3

250W HPSV lamp fitting comprises of single


piece die cast Aluminium body with copper
wound ballast and capacitor, Ignitor, with
pot optics including 250W HPSV lamp etc.,
complete.

a) Material
ELEC-3.1.17 250W HPSV Lamp fitting single piece die each 1 #REF! 1
cast Aluminium body with copper wound
ballast and capacitor, Ignitor, with pot optics
of makes Wipro / G.E./ Phillips
(ELEC-3.4.13) 250W HPSV lamp of makes Wipro / G.E./ each 1 #REF! 1
Phillips / Osram.
Sundries and rounding off
Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
7.4 METAL HALIDE LUMINAIRE
7.4.1 Supply of Integral street light luminaire of
BLD-ELEC-7-4-1

70W MH lamp fitting comprises of single


piece die cast Aluminium body with copper
wound ballast and capacitor, Ignitor, with
pot optics including 70W MH lamp etc.,
complete

a) Material
ELEC-3.1.4 70W MH Lamp fitting single piece die cast each 1 2570.00 1
Aluminium body with copper wound ballast
and capacitor, Ignitor, with pot optics

3.4.8 70W MH lamp each 1 #REF! 1


Sundries and rounding off
Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
7.4.2 Supply of Integral street light luminaire of
BLD-ELEC-7-4-2 150W MH lamp fitting comprises of single
piece die cast Aluminium body with copper
wound ballast and capacitor, Ignitor, with
pot optics including 150W MH lamp etc.,
complete.

a) Material
ELEC-3.1.6 150W MH Lamp fitting single piece die cast each 1 3975.00 1
Aluminium body with copper wound ballast
and capacitor, Ignitor, with pot optics

ELEC-3.4.15 150W MH lamp each 1 900.00 1


Sundries and rounding off
Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
7.4.3 Supply of Integral street light luminaire of
BLD-ELEC-7-4-3

250W MH lamp fitting comprises of single


piece die cast Aluminium body with copper
wound ballast and capacitor, Ignitor, with
pot optics including 250W MH lamp etc.,
complete.

a) Material
ELEC-3.1.8 250W MH Lamp fitting single piece die cast each 1 4340.00 1
Aluminium body with copper wound ballast
and capacitor, Ignitor, with pot optics of
makes Wipro / G.E./ Phillips.
ELEC-3.4.21 250W MH lamp each 1 1350.00 1

Sundries and rounding off


Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
7.4.4 Supply of integral street light luminaire of
BLD-ELEC-7-4-4

250W MH with IP-65 protection, POT optics


comprises of single piece die cast Aluminium
body with copper wound ballast and
capacitor with 250W MH lamp etc.,
complete.

a) Material
ELEC-3.1.8 250W IP-65 MH Lamp fitting single piece each 1 4340.00 1
die cast Aluminium body with copper wound
ballast and capacitor makes Wipro / G.E./
Phillips
ELEC-3.4.22 Lamp cost of 250W MH lamp each 1 1100.00 1

Sundries and rounding off


Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
7.5 POST TOP LUMINAIRE
7.5.1 Supply of post top luminaire of mushroom
BLD-ELEC-7-5-1

type with clear acrylic cover and comprises


of control gear capsule die cast Aluminium
alloy with VPIT / copper ballast suitable for
1X18W CFL with lamp etc., complete.

a) Material
ELEC-3.2.1 1X18W CFL Lamp fitting each 1 1838.00 1

ELEC-3.6.1 18W CFL Lamp each 1 678.00 1

Sundries and rounding off


Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
7.5.2 Supply of 125W HPMV integral post top
BLD-ELEC-7-5-2

luminaire with Aluminium canopy and acrylic


diffuser with all standard accessories and
125W HPMV lamp etc., complete.

a) Material
125W HPMV post top Lamp fitting each 1 #REF! 1
ELEC-3.4.42 Cost of 125W HPMV post top LAMP each 1 #REF! 1
Sundries and rounding off
Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
7.5.3 Supply of 70W HPSV integral post top
BLD-ELEC-7-5-3

luminaire with Aluminium canopy and acrylic


diffuser with all standard accessories and
70W HPSV lamp etc., complete.

a) Material
ELEC-3.2.2 70W HPSV post top Lamp fitting each 1 3822.00 1

Cost of 70W HPSV post top lamp each 1 #REF! 1


Sundries and rounding off
Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
BLD-ELEC-7-5-4
7.5.4 Supply of diamond / sphere type 80W HPMV
post top lantern luminaire with all standard
accessories including 80W M.V. lamp etc.,
complete
a) Material
ELEC-3.3.2 80W HPMV post top diamond / sphere type each 1 #REF! 1
Lamp fitting
ELEC-3.4.38 80W HPMV post top diamond / sphere type each 1 #REF! 1
Lamp
Sundries and rounding off
Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
BLD-ELEC-7-5-6

7.5.6 Supply of diamond / sphere type 125W


HPMV post top lantern luminaire with all
standard accessories including 125W M.V.
lamp etc., complete.
a) Material
ELEC-3.3.4 125W HPMV post top Lamp fitting each 1 #REF! 1
ELEC-3.4.40 125W HPMV post top Lamp each 1 #REF! 1
Sundries and rounding off
Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
7.5.7 Supply of diamond / sphere type 70W HPSV
BLD-ELEC-7-5

post top lantern luminaire with all standard


accessories including 70W S.V. lamp etc.,
complete.
a) Material
ELEC-3.1.12 70W HPSV diamond / sphere post top each 1 #REF! 1
Lamp fitting
ELEC-3.4.9 70W HPSV diamond / sphere post top each 1 #REF! 1
Lamp
Sundries and rounding off
Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
7.6 Well Glass Luminaires
BLD-ELEC-7-6

7.6.1 Supply of 80W M.V integral wellglass


luminaries with all standard accessories and
80W MV lamp etc., complete.
a) Material
80W MV wellglass luminaries each 1
80W MV wellglass luminaries lamp each 1
Sundries and rounding off
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
BLD-ELEC-7-6

7.6.2 Supply of 70W S.V. integral wellglass


luminaries with all standard accessories and
70W S.V. lamp etc., complete.
a) Material
70W SV wellglass luminaires each 1
70W SV wellglass luminaries. each 1
Sundries and rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
7.7 Flood Light Luminaires
BLD-ELEC-7-7-1

7.7.1 Supply of 500W Halogen fitting with all


accessories including 500W Halogen lamp
etc., complete.
a) Material
ELEC-3.1.13 500W halogen lamp fitting. each 1 536.00 1

ELEC-3.4.2 500W halogen lamp each 1 60.00 1

Sundries and rounding off


Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
BLD-ELEC-7-7

7.7.2 Supply of 1000W Halogen fitting with all


accessories including 1000W Halogen lamp
etc., complete.
a) Material
ELEC-3.1.14 1000W halogen lamp fitting. each 1 1071.00 1

ELEC-3.4.4 1000W halogen lamp each 1 80.00 1

Sundries and rounding off


Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
7.7.3 Supply of integral type flood light metal
halide luminaire of 250W comprising of die
cast Aluminium housing and a heat resistant
BLD-ELEC-7-7

toughned glass firmly fixed by means of


gasket and toggles with IP-65 protection
incluidng control gear housing and all
accessories with 250W MH-T lamp etc.,
complete.

a) Material
ELEC-3.1.32 250W MH flood light fitting each 1 #REF! 1
ELEC-3.4.22 250W MH lamp. each 1 1100.00 1

Sundries and rounding off


Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
7.7.4 Supply of integral type flood light metal
halide luminaire of 400W comprising of die
BLD-ELEC-7-7.4

cast Aluminium housing and a heat resistant


toughned glass firmly fixed by means of
gasket and toggles with IP-65 protection
incluidng control gear housing and all
accessories with 400W MH-T lamp etc.,
complete.

a) Material
ELEC-3.1.10 400W MH flood light fitting each 1 5765.00 1

ELEC-3.4.24 400W MH flood light lamps each 1 1400.00 1

Sundries and rounding off


Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
7.8 Labour Charges
7.8.1 Fixing of CFL luminaire (Down lights / Mirror
BLD-ELEC-7-8

optic / Ornamental type fitting with all


necessary accessories in false ceiling / on
wall including giving connections and all
labour charges etc., complete.
a) Material
ELEC-1.6.8 23/0060 twin core flexible copper cable M 1 1040.00 1

ELEC-9.1.2 rawal plugs each 2 0.28 1

ELEC-1.4.20 screws each 2 0.59 1

Aluminium flat / cement and sand etc., LS


labour charges.
b) Labour charges.
Skilled Electrician/carpenter day 0.066 Err:509 1
Semi skilled Electrician / Helper day 0.066 Err:509 1
Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for15 fixtures / day .
7.9.2 Fixing of 70W MH down light and control
BLD-ELEC-7-8

gear box with necessary accessories in false


ceiling including giving connections and all
labour charges etc., complete.
a) Material
ELEC-1.6.8 23/0060 twin core flexible copper cable M 1 1040.00 1
ELEC-9.1.2 rawal plugs each 2 0.28 1
ELEC-1.4.20 screws each 2 0.59 1
Aluminium flat / cement and sand etc., LS
labour charges.
b) Labour charges
Skilled Electrician/carpenter day 0.125 Err:509 1
Semi skilled Electrician / Helper day 0.125 Err:509 1
Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 8
fixtures / day .
7.9.3 Fixing of 40W tube light luminaire on wall /
BLD-ELEC-7-8

Ceiling with / TW round blocks with all


accessories including giving connections
and all labour charges etc., complete.
a) Material
ELEC-1.6.8 23/0060 twin core flexible copper cable M 1 1040.00 1
ELEC-9.1.2 rawal plugs each 2 0.28 1
ELEC-1.4.20 screws each 2 0.59 1
ELEC-9.1.27 T.W round blocks each 2 7.00 1
Cement and sand etc., LS
b) Labour charges
Skilled Electrician/carpenter day 0.1 Err:509 1
Semi skilled Electrician / Helper day 0.1 Err:509 1
Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 10 fixtures /
7.9.4 day
Fixing. of 40W tube lights with 1/2 Mtr conduit
BLD-ELEC-7-9

suspension arrangements from ceiling with


hooks etc., including giving connections and
all labour charges etc., complete.

a) Material
ELEC-1.1.1 20mm dia No.16 gauge MS conduit pipe . M 1 99.00 1
ELEC-1.6.8 23/0060 twin core flexible copper cable each 1 1040.00 1
Anchor screws / Hooks / Sockets & Check each 2 1

b) Labour charges
Skilled Electrician/carpenter day 0.166 Err:509 1
Semi skilled Electrician / Helper day 0.166 Err:509 1
Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 6
fixtures / day .
7.9.5 Fixing of 40W street light luminaire to the
BLD-ELEC-7-9

wall with 1.0 Mtr., 25mm dia GI pipe bracket


and anti tilting MS flat etc., including giving
connections and labour charges etc.,
complete.
a) Material
BMW-F.83 25mm dia G.I pipe M 1 354.00 1
ELEC-1.6.8 23/0060 twin core flexible copper cable M 2 1040.00 1
Pipe bending charges LS
M.S flat and welding charges LS
b) Labour charges
Skilled Electrician/carpenter day 0.2 Err:509 1
Mason day 0.2 Err:509 1
Semi skilled Electrician / Helper day 0.2 Err:509 1
Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 5
fixtures / day .
7.9.6 Fixing of CFL street light luminary with 1.0
BLD-ELEC-7-9

Mtr., 25mm dia GI pipe bracket and anti


tilting MS flat etc., including giving
connections and labour charges etc.,
complete.
a) Material
BMW-F.83 25mm dia G.I pipe M 1 354.00 1
ELEC-1.6.8 23/0060 twin core flexible copper cable M 2 1040.00 1
Pipe bending charges LS
M.S flat and welding charges LS
b) Labour charges
Skilled Electrician/carpenter day 0.125 Err:509 1
Mason day 0.125 Err:509 1
Helper day 0.125 Err:509 1
Sub Total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 8
fixtures / day .
7.9.7 Fixing of mirror optic tube light luminaire in
BLD-ELEC-7-9

false ceiling / pop with necessary


arrangment including giving connections and
all labour charges etc., complete.
a) Material
ELEC-1.6.8 23/0060 twin core flexible copper cable M 1 1040.00 1
Aluminium flat (as per requirment) LS
b) Labour charges for cutting P.O.P / false
ceiling and Fixing MOT
Skilled Electrician day 0.125 Err:509 1
Carpenter day 0.125 Err:509 1
Semi skilled Electrician / Helper day 0.125 Err:509 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 8 Nos MOT lights
7.9.8 Fixing of MV / SV/MH luminaire on wall with
1.0mt 40mm dia GI pipe bracket and anti-
BLD-ELEC-7-9

tilting MS flat, 2.5 Sq.mm flexible copper


cable etc.,including all labour charges for
mason work and giving connections etc.,
complete.

a) Material
ELEC-9.1.55 40mm G.I pipe for Bracket M 1 355.00 1

ELEC-6.6.14 2.5 Sq.mm flexible copper cable M 4 325.00 1

Pipe bending charges LS


b) Labour charges for Antitiling MS flat /
welding charges & fixing
Skilled Electrician day 0.25 Err:509 1
Carpenter day 0.25 Err:509 1
Helper day 0.25 Err:509 1
Welder day 0.25 Err:509 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 4Nos MV / SV / M
8 INTERNAL LUMINAIRE
BLD-ELEC-8.1

8.1.1 Supply and fixing of single fancy bracket


with glass shade and bulb of approved
colour and quality etc., by field officers
a) Material
Err:509 Single Fancy bracket each 1 215.00 1
ELEC-3.7.1 60W Bulb each 1 12.00 1

b) Labour charges
Skilled Electrician day 0.04 Err:509 1
Helper day 0.04 Err:509 1
Sundires LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 25Jobs per Day
BLD-ELEC-8.1

8.1.2 Supply and fixing of double fancy bracket


with glass shade and bulb of approved
colour and quality etc., by field officers.
a) Material
Err:509 Double Fancy bracket each 1 385.00 1
ELEC-3.7.1 60W Bulb each 2 12.00 1
b) Labour charges
Skilled Electrician day 0.05 Err:509 1
Helper day 0.05 Err:509 1
Sundires
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for
20Jobs /Day
8.1.3 Supply and fixing 10" ceiling fittings with
BLD-ELEC-8.1

glass doom and bulb apporved by dept.,


officers including giving connection etc.,
complete.
a) Material
ELEC-8.1.6 10" Ceiling fitting with glass doom each 1 #REF! 1
ELEC-3.7.1 60W Bulb each 1 12.00 1

b) Labour charges
Skilled Electrician day 0.05 Err:509 1
Helper day 0.05 Err:509 1
Sundires
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 20
Jobs / Day
8.1.4 Supply and fixing of Bulk head fitting with
BLD-ELEC-8.1

cast Aluminium enamel painted body with


water tight, clear glass with wire guard
hinged with lock and key arrangements etc.,
complete with lamp.
a) Material
ELEC-3.6.39 Bulkhead fitting each 1 350.00 1
ELEC-3.7.1 60W Bulb each 1 12.00 1

b) Labour charges
Skilled Electrician day 0.083 Err:509 1
Helper day 0.083 Err:509 1
Sundires such as TW block / screws, cement
etc.,
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Note : Labour Charges considered for 12
Jobs / Day
Bldngs_Elec-8-2
8.2 Flourescent Luminaire
8.2.1 Supply and transportation of 1x11 W mirror
BLD-ELEC-8.2

light with all standard accessories diffuser


and 1No 11W CFL lamp etc., complete

a) Material
ELEC-3.6.2 1x11W M.O. fitting each 1 578.00 1

ELEC-3.7.8 Cost of C.F.L. each 1 80.00

Sundries and rounding off


Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
8.2.2 Supply and Transportation and fixing on
wall / ceiling of 1x36/40W box type tube light
BLD-ELEC-8.2

luminaire with copper / VPIT Choke,


condensor, starters etc., and 1No 36/40W
tube etc., complete.with all standard
accessories of makes Wipro / G.E./ Phillips.

a) Material
ELEC-3.6.4 1x40/36 box type T.L fitting each 1 766.00 1

ELEC-3.7.4 36/40 Tube each 1 45.00 1

Sundries and rounding off


Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Add Fixing charges
8.2.3 Supply and transportation of 2x36/40W box
BLD-ELEC-8.2 type tube light luminaire with 2Nos copper /
VPIT chokes, starters, with condensor and
2Nos 36/40W tube etc., complete.with all
standard accessories of makes Wipro / G.E./
Phillips.

a) Material
ELEC-3.6.6 2x40/36 box type T.L fitting each 1 1173.00 1

ELEC-3.7.5 36/40 FTL each 2 38.00 1

Sundries and rounding off


Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
8.2.4 Supply and Transportation of 1x40W patty
BLD-ELEC-8.2

type tube light luminaire with copper choke,


starter etc., including 1No 40W tube etc.,
complete.
a) Material
ELEC-3.6.16 1x40 patty type T.L. fitting each 1 146.00 1

ELEC-3.7.5 40W FTL each 1 38.00 1

Sundires and rounding off


Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
Bldngs_Elec-8-3
8.3 INDUSTRIAL luminaire
8.3.1 Supply and Transportation of white vitreous
BLD-ELEC-8.3.

1x36 / 40W industrial box type luminaire with


Copper / VPIT Choke, Condensor, Starters
etc., with reflector including 1No 40W tube
etc., complete.
a) Material
1x36/40W Industrial box type T.L. fitting each 1
36/40W FTL each 1
Sundries and rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
8.3.2 Supply and Transportation of white vitreous
2x36 / 40W industrial box type luminaire with
BLD-ELEC-8.3.

2Nos Copper / VPIT Choke, Condensor,


Starters etc.,complete with reflector
including 2Nos 40W tube etc., complete.
BLD-ELE
a) Material
ELEC-3.6.35 2x36/40W Industrial box type T.L. fitting each 1 1615.00 1
ELEC-3.7.5 36/40W FTL each 2 38.00 1

Sundries and rounding off


Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
8.4 MIRROR OPTIC luminaire
8.4.1 Supply and Transportation of 2x36 / 40W
surface mounting mirror optic luminaire with
BLD-ELEC-8.4

powder coated CRCA sheet steel housing


with Aluminium mirror reflectors with VPIT
chokes, Starters, Condensor etc., complete
with 2Nos 36/40W tubes etc.,complete.

a) Material
ELEC-3.6.7 2x36/40 Surface M.O.L fitting each 1 2300.00 1

ELEC-3.7.5 40/36 FTL each 2 38.00 1

Sundries and rounding off


Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
8.4.2 Supply and transportation of 2x36/40W
recessed mounting mirror optic (darklite)
BLD-ELEC-8.4

luminaire with powder coated CRCA sheet


steel housing with Aluminium mirror reflector
with VPIT Chokes, Starter, Condensor etc.,
complete with 2Nos 36/40W tubes etc.,
complete.

a) Material
ELEC-3.6.7 2x36/40 Recessed M.O. L fitting each 1 2300.00 1

ELEC-3.7.5 36/40 FTL each 2 38.00 1

Sundries and rounding off


Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
8.4.3 Supply and transportation of 2x11W surface
mounting mirror optic luminaire with powder
BLD-ELEC-8.4

coated CRCA sheet steel housing with


Aluminium mirror refector with VPIT Chokes
and 2Nos 11W CFL lamps etc., complete.
BLD-ELE
a) Material
2x11W CFL surface M.O.L fitting each 1
11W CFL each 2
Sundries and rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
8.4.4 Supply and transportation of 2x11W
Recessed type luminaire with powder coated
BLD-ELEC-8.4

CRCA sheet steel housing with Aluminium


mirror refector with VPIT Chokes and 2Nos
11W CFL lamps etc., complete.

a) Material
2x11W CFL recessed M.O.L fitting each 1
11W cfl each 2
Sundries and rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
8.4.5 Supply and transportation of 2x36w CFL
BLD-ELEC-8.4

paralite louvre (P5) recessed low glare


mirror optic luminaire comprising bright
anodised Aluminium reflector with VPIT
Chokes and 36w CFL lamps.
a) Material
ELEC-3.6.40 2x36 CFL PS paralite Louvars fitting each 1 #REF!
36w CFL each 2
Sundries and rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
8.4.6 Supply and transportation of 3x36w CFL
BLD-ELEC-8.4

paralite louvre (P5) recessed low glare


mirror optic luminaire comprising bright
anodised Aluminium reflector with VPIT
Chokes and 3x36w CFL lamps.
a) Material
ELEC-3.6.42 3x36 CFL PS paralite Louvars fitting each 1
36w CFL each 3
Sundries and rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
8.5 T- 5 Luminaires.
8.5.1 Supply and transportation of 1X28W
BLD-ELEC-8.5-1

surface pendant mounting T- 5 extruded


Aluminium with Aluminium reflector luminaire
with all standard accessories and
connections etc., complete with 1 No. 28 W
tube

a) Material
ELEC-3.6.36 1x28w pendant T5 lugs fitting each 1 540.00 1

ELEC-3.7.6 28w T5 FTL each 1 120.00 1

Sundries and rounding off


Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
8.5.2 Supply and transportation of 2X28W
BLD-ELEC-8.5

recessed With 2 Nos. pendant mounting low


glare T- 5 mirror optic luminaire with
electronic Ballasts etc., complete 28w tubes.

a) Material
2x28w T5 M.O. fitting each 1
28w T5 FTL each 2
Sundries and rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
8.6 C.F.L. Down Lights
8.6.1 Supply and transportation of recessed
BLD-ELEC-8.6

mounting 1x13W CFL down light with all


standard accessories with 1No. 13W CFL
lamp (D type) etc., complete.
a) Material
1x13W CFL Down light fitting each 1
13W CFL each 1
Sundries and rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
8.6.2 Supply and transportation of recessed
BLD-ELEC-8.6

mounting 2x13W CFL down light with all


standard accessories with 2No. 13W CFL
lamp etc., complete.
a) Material
2x13W CFL Down light fitting each 1
13W CFL each 2
Sundries and rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
8.6.3 Supply and transportation of recessed
BLD-ELEC-8-6-3

mounting 1x18W CFL down light with all


standard accessories with 1No. 18W CFL
lamp etc., complete.

a) Material
ELEC-3.6.10 1x18W CFL Down light fitting each 1 750.00 1

ELEC-3.7.10 18W CFL each 1 115.00 1

Sundries and rounding off


Skilled Electrician day 0.05 Err:509 1
Helper day 0.05 Err:509 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
8.6.4 Supply and transportation of recessed
BLD-ELEC-8.6

mounting 2x18W CFL down light with all


standard accessories with 2No. 18W CFL
lamp etc., complete.
a) Material
2x18W CFL Down light fitting each 1
18W CFL each 2
Sundries and rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
8.6.5 Supply and Transportation recess mounting
BLD-ELEC-8.6

70W metal hallide down lighter with control


gear and 1No 70W M.H lamp etc., complete.

a) Material
ELEC-3.1.10 70W M.H down light fitting each 1 #REF! 1
ELEC-3.3.7 70W M.H lamp each 1 #REF! 1
Sundries and rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
BLD-ELEC-8.6 8.6.6 Supply and Transportation of Ceiling / Wall
mounted Circular 1x13W luminaire with
decorative acrylic diffuser and 1 No. 13W
CFL lamp (circular type) etc., complete.

a) Material
1x13W Circular CFL fitting each 1
13W CFL each 1
Sundries and rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
8.6.7 Supply and Transportation of Ceiling / Wall
BLD-ELEC-8.6

mounted Circular 2x13W luminaire with


decorative acrylic diffuser and 2 No. 13W
CFL lamp (circular type) etc., complete.

a) Material
2x13W Circular CFL fitting each 1
13W CFL each 2
Sundries and rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
8.7 HALOGEN DOWN LIGHTERS
8.7.1 Supply and Transportation of recess
BLD-ELEC-8.7

mounting 12v, 50w adjustable halogen down


light with white / colour Shade including
transformer and 1No 50w halogen lamp etc.,
complete.
a) Material
ELEC-3.6.58 50w Halogen recessed mounting each 1 #REF! 1
50w Halogen bulb each 1 1
Sundries and rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
8.7.2 Supply and Transportation of recess
BLD-ELEC-8.7

mounting 12v, 50w Zoom type halogen down


light with white / colour Shade including
transformer and 1No 50w halogen lamp etc.,
complete.
a) Material
ELEC-3.6.60 50w Halogen zoom type down light. each 1 #REF! 1
50w Halogen bulb each 1 1
Sundries and rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
9 AIR CONDITIONING & REFRIGERATION
9.1 Air-Conditioners
9.1.1(a) Supply and Transportation of Window
BLD-ELEC-9-1

mounted type, Room Air-Conditioner 1.5 Ton


confirming to IS : 1391, Suitable for
operation on 230V + 10% 50 Hz.., Single
phase, A.C. Supply capable for performing
Cooling, Dehumidifying, Air Circulating,
Filtering and Ventilation etc., complete.

a) Material
1.5 Ton A.C Unit
ADD : Duties & Taxes as applicable
Transportation on Material 2%
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
9.1.1(b) Supply and Transportation of Window
mounted type, Room Air-Conditioner 2.0 Ton
BLD-ELEC-9-1

confirming to IS : 1391, Suitable for


operation on 230V + 10% 50 Hz.., Single
phase, A.C. Supply capable for performing
Cooling, Dehumidifying, Air Circulating,
Filtering and Ventilation etc., complete.

a) Material
2.0 Ton A.C Unit 0.00
ADD : Duties & Taxes as applicable
Transportation on Material 2%
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per each
9.1.2 (a) Supply and Transportation of 1.5 Ton Split
type Air-Conditiner, fitted with Hermetically
sealed compressor, Operating on refrigerant
R-22 / Non - CFC High wall mounting
BLD-ELEC-9-1-2A

confirming to IS : 1391, suitable for


operation on 230V, 50 Hz.., Single phase,
A.C Supply capable of performing Cooling,
Dehumidifying, Air Circulating, Filtering with
cooling and condensing units, with 5 Mtr of
required size of copper piping duly insulated
and 3 core copper flexible chord of required
length etc., complete.
a) Material
ELEC-6.1.1e 1.5 Ton Split A.C Unit ABS (Plastic Cabin) 50250.00 1

ADD : Duties & Taxes as applicable


Transportation on Material 2%
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
9.1.2 (b) Supply and Transportation of 2.0 Ton Split
type Air-Conditiner, fitted with Hermetically
sealed compressor, Operating on refrigerant
R-22 / Non - CFC High wall mounting
confirming to IS : 1391, suitable for
operation on 230V, 50 Hz.., Single phase,
BLD-ELEC-9-1

A.C Supply capable of performing Cooling,


Dehumidifying, Air Circulating, Filtering with
cooling and condensing units, with 5 Mtr of
required size of copper piping duly insulated
and 3 core copper flexible chord of required
length etc., complete.

a) Material
ELEC-6.1.1f 2.0 Ton Split ABS Plastic Cabin A.C Unit 56490.00 1
ADD : Duties & Taxes as applicable
Transportation on Material 2%
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
9.1.3 Installation Charges for 1/0 / 1.5 / 2.0 Ton
BLD-ELEC-9-1

Window type room Air-Conditioner with


insulating foam, testing and commissioning
etc., complete.
a) Material
Installation Charges of Window type
A.C.Unit. (as per observed Data)
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
9.1.4 Installation Charges for 1.5 / 2.0 Ton Split
BLD-ELEC-9-1

Air-Conditioner with foam, insulation for


copper pipings connected for the Indoor and
outdoor unit including testing and
commissioning etc., complete.
a) Material
Installation Charges of 1/5 / 2.0 Ton Split
A.C.Unit. (As per observed Data )
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
9.1.5 Supply, Fabrication and installation of well
seasoned T.W. frame of size 685 x 483 mm
(27" x 19") ( with section size of 75 x 100
BLD-ELEC-9-1

mm (3" x 4" T.W.)) for 1.0 / 1.5 / 2.0 Ton


Window A.C.Unit duly making necessary
provision in the wall / Window with cost and
conveyance of all materials etc., complete

a) Material
Well seasoned wooden frame for Window cum 0.018
A.C Units
b) Labour charges for fabrication &
Fixing
Carpenter day 0.5 #REF! 1
Mason day 0.5 #REF! 1
Helper day 0.5 #REF! 1
Making necessary provision in wall / window LS
with Hardware
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
9.1.6 Supply, Fabrication and installation of 38 x
38 x 6 mm (1.5" x 1 1/2" x 1/4") M.S. angle
BLD-ELEC-9-1

Iron frame suitable for condensing Unit for


Split A.C including 2 Coats of Red oxide the
followed by 2 coats enamel paint etc.,
complete.

a) Material
38 x 38 x 6 mm (1.5" x 1 /12" x 1/4") angle kg 10.5
iron frame, 13 M length (1 Mtr = 3.5 Kgs)

Fabrication charges including Painting kg 10.5


b) Labour charges for Fixing
Carpenter day 0.25 #REF! 1
Mason day 0.25 #REF! 1
Helper day 0.25 #REF! 1
Sundires such as cement etc. LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 4 jobs /
day
9.1.7 Supply and Installation of copper tubing
BLD-ELEC-9-1 between indoor and outdoor unit for split Air-
Conditioner including foaming etc.,
complete.
a) Material
ELEC-6.6.2 Copper tubing between indoor and outdoor 1000.00 1
units inlcuding foaming
b) Labour charges for cutting, bending,
welding etc.,
Welder day 0.04 Err:509 1
Helper day 0.04 Err:509 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre
Note : Labour is Considered for 25 M /
day
9.2 REPAIRS TO AIR - CONDITIONERS
BLD-ELEC-9-2

9.2.1 Replacement of defective compressor by


supply of 1.0 / 1.5 Ton brand new sealed
compressor ISI Mark
a) Material
ELEC-6.6.3 Supply of brand new.1/ 1.5 Ton compressor each 1 8150.00 1
ISI Mark
b) Labour charges
Skilled Electrician day 0.5 Err:509 1
Helper day 0.5 Err:509 1
Transportation on Material 2%
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
BLD-ELEC-9-2

9.2.2 Replacement of defective compressor by


supply of 2.0 Ton brand new sealed
compressor ISI Mark
a) Material
ELEC-6.6.4 Supply of brand new 2.0 Ton compressor by each 1 9250.00 1
brand new ISI Mark
b) Labour charges
Skilled Electrician day 0.5 Err:509 1
Helper day 0.5 Err:509 1
Transportation on Material 2%
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
9.2.3 Replacement of old and Unserviceable Fan
BLD-ELEC-9-2

Motor by supply and Installation of new 1/6th


H.P multi speed Fan Motor suitable for 1.0 /
1.5 / 2.0 Ton Window A.C.Unit.

a) Material
ELEC-6.6.5 Supply of 1/6th H.P multispeed Fan Motor each 1 1590.00 1
for 1.0 / 1.5 / 2.0 T A.C.Unit.
b) Labour charges
Skilled Electrician day 0.5 Err:509 1
Helper day 0.5 Err:509 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
BLD-ELEC-9-2

9.2.5 Replacement of Unserviceable fan motor


capacitor 6 mfd by new capacitor for A.C
machine of 1.0 1.5 / Ton Capacity.
a) Material
ELEC-6.6.6 6 MFD motor capacitor each 1 156.00 1

b) Labour charges for removing old one


& fixing
Semi skilled Electrician day 0.2 Err:509 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 5 jobs /
day
9.2.6 Replacement of Unserviceable Thermostat
BLD-ELEC-9-2

switch by supply and installation of new


thermostat switch suitable for 1.0 / 1.5 / 2.0
Ton A.C.Unit.
a) Material
ELEC-6.6.7 Thermostat switch for 1.0 / 1.5 / 2.0 Ton each 1 410.00 1
A.C.Unit.
b) Labour charges for removing old one
& fixing
Semi skilled Electrician day 0.2 Err:509 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 5 jobs /
day
9.2.7 Replacement of Unserviceable starting
BLD-ELEC-9-2

capacitor of 80 to 120 mfd. By new


approved make capacitor suitable for
compressor motor of 1.0 / 1.5 Ton A.C. Unit.

a) Material
ELEC-6.6.8 Starting capacitor of 80 to 120 mfd. each 1 200.00 1

b) Labour charges for removing old one


& fixing
Semi skilled Electrician day 0.2 Err:509 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 5 jobs /
day
9.2.8 Replacement of unserviceable running
BLD-ELEC-9-2

capacitor of 36 mfd by new approved make


capacitor suitable for compressor motor of
1.0 / 1.5 Ton A.C.Unit.
a) Material
ELEC-6.6.9 Running capacitor 36 mfd each 1 242.00 1

b) Labour charges for removing old one


& fixing
Semi skilled Electrician day 0.2 Err:509 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 5 jobs /
day
9.2.9 Replacement of Unserviceable relay by new
BLD-ELEC-9-2

approved make having pickup voltage 220


Volts and dropout voltage 120 Volts suitable
for 1.0 / 1.50 Ton A.C. Unit.
a) Material
ELEC-6.6.10 Relay having pickup 220V and dropout each 1 225.00 1
voltage 120V
b) Labour charges for removing old one
& fixing
Semi skilled Electrician day 0.2 Err:509 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 5 jobs /
day
9.2.10 Replacement of Unserviceable filter and
BLD-ELEC-9-2

capillary tube by supply and installation of


new filter and capillary tube including
welding et., complete for 1.0 / 1.5 / 2.0 Ton
A.C.Unit.
a) Material
ELEC-6.6.11 Filter and capillary tube for 1.0 / 1.5/2.0 Ton each 1 485.00 1
A.C.Unit
b) Labour charges for removing old one
& fixing
Semi skilled Electrician day 0.2 Err:509 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 5 jobs /
day
BLD-ELEC-9-2

9.2.11 Replacement of Unserviceable air filter by


new air filter suitable for 1.50 Ton A.C.Unit
P.V.C. / NYLON for Window A.C.
a) Material
ELEC-6.6.12 PVC / Nylon Air Filter for Window type each 1 225.00 1
A.C.Unit.
b) Labour charges for removing old one
& fixing
Semi skilled Electrician day 0.2 Err:509 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 5 jobs /
day
BLD-ELEC-9-2

9.2.11(a) Replacement of Unserviceable air filter by


new air filter suitable for 1.50 Ton A.C.Unit
P.V.C. / NYLON for Split A.C.
a) Material
ELEC-6.6.12 PVC / Nylon Air Filter for Split type A.C.Unit. each 1 475.00 1

b) Labour charges for removing old one


& fixing
Semi skilled Electrician day 0.2 Err:509 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 5 jobs /
day
9.3 Refrigerators
9.3.1 Supply Refrigerator domestic type approved
make 285 to 310 Ltrs. Storage capacity,
suitable for operation on 230 /250 Volts 50
Hz.. complete with automatic temparture
BLD-ELEC-9-3

control confirming to IS specifications No.


1476 / 79 with one year guarantee for seale
unit in refrigeration system including cost
and conveyance of all materials and labour
charges etc., complete.

a) Material
ELEC-6.6.24 ----- capacity refrigerator cost each 1 3750.00 1

Transportation @ 2% of Unit Cost 2%


Loading, Unloading & Instalation @ 2% of 2%
Unit Cost
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
9.6 Stabilizers
9.6.1 Supply and erecting fully automatic line
voltage stabilizer for operation on input
voltage 200 to 250V. rated for 0.5 KVA
maximum load and time delay model with
BLD-ELEC-9-6

Volt meter, selector switch, 6A / 16A flush


type, 5 pin socket for out put and with 3 core
flexible chord and 3 pin 6/16A plug top
suitable for refrigerator for continuous
operation including cost and conveyance of
all mateials and all labour charges etc.,
complete.

a) Material
ELEC-6.8.2 0.5 KVA Stabilizer each 1 810.00 1

b) Labour Charges
Semi skilled Electrician day 0.044 Err:509 1
Helper day 0.044 Err:509 1
Transportation Charges on Unit Cost 2%
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 23 jobs /
day
9.6.2 Supply and erecting fully automatic line
voltage stabilizer for operation on input
voltage 200 to 250V. rated for 1 KVA
maximum load and time delay model with
BLD-ELEC-9-6

Volt meter, selector switch, 6A / 16A flush


type, 5 pin socket for out put and with 3 core
flexible chord and 3 pin 6/16A plug top
suitable for refrigerator for continuous
operation including cost and conveyance of
all mateials and all labour charges etc.,
complete.

a) Material
ELEC-6.8.3 1 KVA Stabilizer each 1 1805.00 1

b) Labour Charges
Semi skilled Electrician day 0.044 Err:509 1
Helper day 0.044 Err:509 1
Transportation Charges on Unit Cost 2%
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 23 jobs /
day
9.6.3 Supply and erecting fully automatic line
voltage stabilizer for operation on input
voltage 200 to 250V. rated for 3 KVA / 4 KVA
/ 5 KVA maximum load and time delay model
with Volt meter, selector switch, 6A / 16A
BLD-ELEC-9-6

flush type, 5 pin socket for out put and with 3


core flexible chord and 3 pin 6/16A plug top
suitable for refrigerator for continuous
operation including cost and conveyance of
all mateials and all labour charges etc.,
complete.

a) Material
ELEC-6.8.5 3 KVA / 4 KVA / 5 KVA Stabilizer each 1 2250.00 1

b) Labour Charges
Skilled Electrician day 0.1 Err:509 1
Helper day 0.1 Err:509 1
Transportation Charges on Unit Cost 2%
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 10 jobs /
day
9.7 Fans
9.7.2A Supply and Fixing of 1200 mm (48") sweep
230V, A.C 50 Hz.Ceiling fan with 3 Blades
and double ball bearings with all standard
accessoriesand 400W Mini Modular Stepped
type Electronic Regulator with Cover Frame
BLD-ELEC-9-7-2

including providing fan hook of 12/15mm dia


M.S. rod / bar grouted in RCC slab with
making the slab as original and 19/20mm
steel tube down rod of one meter length with
bolts & nuts duly painted with matching
colour of fan etc,. complete

a) Material
(ELEC-5.1.1) 1200 mm (48") Ceiling Fan without each 1 1760.00
Regulator.of makes Crompton High Speed /
Bajaj Ultima / Havells Velocity / Usha Astra /
Orient Summer Pride.
ELEC-1.8.12 Supply and fixing of 400W Mini Modular each 1 240.00
Stepped type Electronic Regulator with
Cover Frame of makes Anchor / Gold
Medal / Million / Vimal / Maru / Milltec.
Transportation Charges on Unit Cost 1%
Supply and erecting fan hook of 12/15mm each 1 97.40
dia M.S. rod / bar grouted in RCC slab with
making the slab as origin
Supply and erecting 19/20mm steel tube each 1 28.85
down rod of one meter length
add labour charges for fixing
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
9.7.2B Supply and Fixing of 1400 mm (48") sweep
230V, A.C 50 Hz.Ceiling fan with 3 Blades
and double ball bearings with all standard
accessoriesand 400W Mini Modular Stepped
BLD-ELEC-9-7-2B

type Electronic Regulator with Cover Frame


including providing fan hook of 12/15mm dia
M.S. rod / bar grouted in RCC slab with
making the slab as original and 19/20mm
steel tube down rod of one meter length with
bolts & nuts duly painted with matching
colour of fan etc,. complete

a) Material
ELEC-5.1.3 1400 mm (48") Ceiling Fan without each 1 1840.00
Regulator.of makes Crompton High Speed /
Bajaj Ultima / Havells Velocity / Usha Astra /
Orient Summer Pride.
ELEC-1.8.12 Supply and fixing of 400W Mini Modular each 1 240.00
Stepped type Electronic Regulator with
Cover Frame of makes Anchor / Gold
Medal / Million / Vimal / Maru / Milltec.
Transportation Charges on Unit Cost 1%
Supply and erecting fan hook of 12/15mm each 1 97.40
dia M.S. rod / bar grouted in RCC slab with
making the slab as origin
Supply and erecting 19/20mm steel tube each 1 28.85
down rod of one meter length
add labour charges for fixing
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
9.7.7 Supply and erecting wall mounting fan
BLD-ELEC-9-7

400mm (16") / 450 mm (18") sweep A.C.


50Hz.. 1350 r.p.m oscillating type with
regulator.
a) Material
ELEC-5.1.5 400mm (16") / 450 mm (18") wall mounting each 1 2352.00
Fan
b) Labour Charges
Semi Skilled Electrician day 0.1 Err:509 1
Helper day 0.1 Err:509 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 10 jobs /
day
BLD-ELEC-9-7

9.7.10 Supply of pedastal fan (16") 400mm, 250


Volts, 50Hz. oscillating type complete with all
standard accessories.
a) Material
ELEC-5.1.6 400mm (16") Pedastal Fan each 1 2714.00 1

Transportation Charges on Unit Cost 2%


Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
9.7.16 EXHAUST FANS
BLD-ELEC-9-7-16

Supply of fresh air exhaust fan of light duty


250V A.C.50Hz.. 225 mm (9") 1350 R.P.M
Metallic body plastic blades, wire mesh, etc.,
complete.
a) Material
ELEC-5.1.11 225 mm (9") L.D. Exhaust Fan each 1 1265.00 1

Transportation Charges on Unit Cost 1%


Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
9.7.18 Supply of fresh air exhaust fan of Heavy
BLD-ELEC-9-7-18

duty 250V A.C.50Hz.. 300mm size (12") /


375 mm (15") 900 R.P.M etc., complete.

a) Material
ELEC-5.1.10 300mm (12") / 375 mm (15") H.D. Exhaust each 1 1350.00 1
Fan
Transportation Charges on Unit Cost 1%
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
BLD-ELEC-9-7

9.7.24 Supply and erecting fan hook of 12/15mm


dia M.S. rod / bar grouted in RCC slab with
making the slab as original.
a) Material
ELEC-5.5.27 12/15mm plain M.S rod for Fan hook each 1 0.00
Cement, Sand and Rounding off LS
b) Labour charges for grouting in RCC
slab, Fixing of Fan hook with masonary
work.
Mason day 0.166 238.00 1
Helper day 0.166 288.40 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 6 jobs /
day
9.7.25 Supply and erecting 19/20mm steel tube
BLD-ELEC-9-7

down rod of one meter length with bolts &


nuts duly painted with matching colour of
fan complete
a) Material
ELEC-5.5.28 19/20mm steel tube down rod with bolts & M 1 0.00
nuts for fan with maching colour.(ELEC-
5.5.28)
b) Labour charges for Fixing
Helper day 0.1 288.40 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 10 jobs /
day
9.7.26 Supply and erecting resistance type
BLD-ELEC-9-7

regulator for ceiling fans 900/1200/1400mm


sweep complete erected on existing board.

a) Material
(ELEC-1.8.14) Resistance type Regulator of makes M 1 0.00
Anchor / Gold Medal / Million /
b) Labour charges.
Semi skilled Electrician day 0.1 #REF! 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 10 jobs /
day
BLD-ELEC-9-7

9.7.33 Cleaning of Ceiling fan in existing position .

Labour charges for cleaning greasing /


oilingoverhauling
Helper day 0.2 #REF! 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Note : Labour is Considered for 10 jobs / day by 2
BLD-ELEC-9-7

9.7.34 helpers
Removing the ceiling fan and refixing after
overhauling and greasing the bearings and
replacement of wire leads etc complete
a) Material
ELEC-1.6.8 23/0060 twin core wire M 1 #REF! 1
b) Labour charges.
Removing and refixing of ceiling fan after
overhauling
Semi skilled Electrician day 0.166 #REF! 1
Helper day 0.166 #REF! 1
sundries LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 6 jobs /
day
9.7.35 Labour Charges
BLD-ELEC-9-7

Labour charges for Fixing of Ceiling fan and


regulator including transportation and giving
connections with twin core wire etc.,
complete.
a) Material
ELEC-1.6.8 23/0060 Twin Core wire M 1 1040.00 100

Unforseen item works, such as painting to LS


down rod, screws etc.,
b) Labour charges.
Skilled Electrician day 0.125 Err:509 1
Helper day 0.125 Err:509 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 8 fans /
day
9.7.36 Labour charges for fixing of Exhaust fan in
BLD-ELEC-9-7

wall with necessary connections and


masonary work of making hole, finishing
etc., complete
a) Material
ELEC-1.6.8 23/0060 Twin flat wire M 1 1040.00 100

ELEC-9.1.48 Cement kg 25 6.60 1

b) Labour charges.
Skilled Electrician day 0.25 Err:509 1
Helper day 0.25 Err:509 1
Mason day 0.25 Err:509 1
Sundries such as Sand, Bolt, Nuts etc., LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note :1. Labour is Considered for 6 jobs /
day
2. Cost of louver shutter may be added if
required.
3. If hole is already made available, labour
charges of Mason shall be deleted.
10 WATER HEATERS
10.1.2 Supply and Transportation of stove
enamelled storage / pressure type vertical /
Horizontal water heater with copper tank
25 / 35 / 50 Ltrs. Capacity with non return
valve on inlet side and dead weight pressure
BLD-ELEC-10-1

reducing valve on outlet side 230/ 250V,


single phase 2000 watts heating element,
thermostat control, fusible plug, pilot lamp
etc., erected and tested complete with ISI
specifications etc., including all materials,
transportation, and labour charges complete.

a) Material
ELEC-5.2.2 25 / 35 / 50 Ltrs. Water Heater each 1 10900.00 1

Transportation Charges on Unit Cost 2%


Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
10.1.5 Labour charges for erection of storage water
BLD-ELEC-10-1

heater with 2Nos Nylon / PVC / Metalic hose


pipe etc., on wall duly making necessary
fixing arrangments including connections
etc., complete.
a) Material
ELEC-5.3.4 Flexible Nylon / PVC / Metallic hose pipe each 2 165.00 1

ELEC-9.1.5 50 / 100 mm (2" / 4") long bolt and nut with each 4 13.00 1
washers
ELEC-9.1.48 Towards wooden plugs, cement etc., LS 6.60
b) Labour charges.
Skilled Electrician day 0.25 Err:509 1
Helper day 0.5 Err:509 1
Semi skilled Mason day 0.25 Err:509 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 4 jobs /
day
10.2 INSTANT WATER HEATERS
10.2.1 Supply and erecting ISI Mark 3KW Instant
Water heater with multiple safety system,
rust free ABS plastic body, 230V, 50Hz..,
A.C. supply with inlet and outlet connections
BLD-ELEC-10-2

with pvc/ nylon / metallic hose pipe,


thermostat control and thermal cutoff with 3
core P.V.C. flexible wire leads duly tested
including cost of all materials and all labour
charges etc., complete.

a) Material
3KW Instant Water Heater each 1
Transportation Charges on Unit Cost 2%
ELEC-5.3.4 Hose pipe PVC/ Nylon each 2 #REF!
ELEC-8.1.54 T.W getting Bolt / Nuts, Cement, Sand etc. LS #REF!

b) Labour charges.
Skilled Electrician day 0.25 Err:509 1
Helper day 0.25 Err:509 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 4 jobs /
day
10.4 REPAIRS TO WATER HEATERS.
BLD-ELEC-10-3

10.4.1 Replacement of unserviceable heating


element by new one for 1.5 / 2.0 / 3.0 Kw
water heater
a) Material
ELEC-5.3.1 2/3 KW heating Element each 1 400.00 1

b) Labour charges.
Skilled Electrician day 0.2 Err:509 1
Sundries and rounding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 5 jobs /
day
BLD-ELEC-10-3

10.4.2 Replacement of Unserviceable thermostat


by new thermostat with range 30 to 90 C.
adjustable and suitable for 25 to 50 Ltrs.
Capacity.
a) Material
ELEC-5.3.2 Thermostat range 30-90 Degree suitable for each 1 275.00 1
25 to 50 Ltrs.
b) Labour charges.
Skilled Electrician day 0.2 Err:509 1
Sundries and rounding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
BLD-ELEC-10-3

10.4.5 Replacing unserviceable pressure release


valve by new water heater of 15 to 50
Ltrs.capacity.
a) Material
ELEC-5.3.3 Pressure release valve for 15 to 50 Ltrs each 1 275.00 1
water heater
b) Labour charges.
Skilled Electrician day 0.2 Err:509 1
Sundries and rounding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11 WATER PUMPS
11.1 Mono-Block Pumps
11.1.1 Supply and erecting approved make
centrifugal water pump with impeller, priming
funnel cork, companion metallic flanges, with
bolts and nuts and mounted on a common
shaft of high efficient squirrel cage Induction
BLD-ELEC-11-1

motor totally enclosed and fan cooled type


suitable to operate on 230V, Single phase,
50Hz.. 1440 RPM A.C.Supply of 0.5HP
exculding suction / delivery pipe with nuts
duly grouted on existing C.C foundation and
bolts, spring washers of requisite size for
monoblock motor and pump (IS : 9079).

a) Material
ELEC-5.9.1 0.5HP, 230V, single phase A.C 50Hz. 1440 each 1 5145.00 1
RPM with all accessories. Including all taxes

Transportation Charges on Unit Cost 2%


b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 0.5 Err:509 1
Helper day 1 Err:509 1
Plumber day 0.5 Err:509 1
Sundries and rounding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
11.1.2 Supply and erecting approved make
centrifugal water pump with impeller, priming
funnel cork, companion metallic flanges, with
bolts and nuts and mounted on a common
shaft of high efficient squirrel cage Induction
BLD-ELEC-11-1

motor totally enclosed and fan cooled type


suitable to operate on 230V, Single phase,
50Hz.. 1440 RPM A.C.Supply of 1HP
exculding suction / delivery pipe with nuts
duly grouted on existing C.C foundation and
bolts, spring washers of requisite size for
monoblock motor and pump (IS : 9079).

a) Material
ELEC-5.9.1 1 HP, 230V, single phase A.C 50Hz. 1440 each 1 7455.00 1
RPM with all accessories. Including all taxes

Transportation Charges on Unit Cost 2%


b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 0.5 Err:509 1
Helper day 1 Err:509 1
Plumber day 0.5 Err:509 1
Sundries and rounding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.1.3 Supply and erecting approved make
centrifugal water pump with impeller, priming
funnel cork, companion metallic flanges, with
bolts and nuts and mounted on a common
shaft of high efficient squirrel cage Induction
motor totally enclosed and fan cooled type
BLD-ELEC-11-1

suitable to operate on 230V, Single phase,


50Hz.. 1440 RPM A.C.Supply of 1.5 HP
exculding suction / delivery pipe with nuts
duly grouted on existing C.C foundation and
bolts, spring washers of requisite size for
monoblock motor and pump (IS : 9079).

a) Material
ELEC-5.9.1 1.5 HP, 230V, single phase A.C 50Hz. 1440 each 1 9975.00 1
RPM with all accessories. Including all taxes

Transportation Charges on Unit Cost 2%


b) Labour charges.
Skilled Fitter day 0.5 Err:509 1
Helper day 1 Err:509 1
Plumber day 0.5 Err:509 1
Sundries and rounding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.1.4 Supply and erecting approved make
centrifugal water pump with impeller, priming
funnel cork, companion metallic flanges, with
bolts and nuts and mounted on a common
shaft of high efficient squirrel cage Induction
motor totally enclosed and fan cooled type
BLD-ELEC-11-1

suitable to operate on 230V, Single phase,


50Hz.. 1440 RPM A.C.Supply of 2.0 HP
exculding suction / delivery pipe with nuts
duly grouted on existing C.C foundation and
bolts, spring washers of requisite size for
monoblock motor and pump (IS : 9079).

a) Material
ELEC-5.9.1 2 HP, 230V, single phase A.C 50Hz. 1440 each 1 14700.00 1
RPM with all accessories. Including all taxes

Transportation Charges on Unit Cost 2%


b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 0.5 Err:509 1
Helper day 1 Err:509 1
Plumber day 0.5 Err:509 1
Sundries and rounding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.1.5 Supply and erecting approved make
centrifugal water pump with impeller, priming
funnel cork, companion metallic flanges, with
bolts and nuts and mounted on a common
shaft of high efficient squirrel cage Induction
BLD-ELEC-11-1

motor totally enclosed and fan cooled type


suitable to operate on 415V, 3 phase, 50Hz..
2880 RPM A.C.Supply of 3.0HP exculding
suction / delivery pipe with nuts duly grouted
on existing C.C foundation and bolts, spring
washers of requisite size for monoblock
motor and pump (IS : 9079).

a) Material
ELEC-5.9.1 3 phase, 3 HP, 415V, 50Hz., 2880 RPM each 1 19950.00 1
centrifugal Water pump with all taxes
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 1 Err:509 1
Helper day 1 Err:509 1
Plumber day 1 Err:509 1
Sundries and rounding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.1.6 Supply and erecting approved make
centrifugal water pump with impeller, priming
funnel cork, companion metallic flanges, with
bolts and nuts and mounted on a common
shaft of high efficient squirrel cage Induction
BLD-ELEC-11-1

motor totally enclosed and fan cooled type


suitable to operate on 415V, 3 phase, 50Hz..
2880 RPM A.C.Supply of 5HP exculding
suction / delivery pipe with nuts duly grouted
on existing C.C foundation and bolts, spring
washers of requisite size for monoblock
motor and pump (IS : 9079).
a) Material
ELEC-5.9.1 3 phase, 5 HP, 415V, 50Hz., 2880 RPM each 1 24150.00 1
centrifugal Water pump with all taxes
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 1 Err:509 1
Helper day 1 Err:509 1
Plumber day 1 Err:509 1
Sundries and rounding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.1.7 Supply and erecting approved make
centrifugal water pump with impeller, priming
funnel cork, companion metallic flanges, with
bolts and nuts and mounted on a common
shaft of high efficient squirrel cage Induction
BLD-ELEC-11-1

motor totally enclosed and fan cooled type


suitable to operate on 415V, 3 phase, 50Hz..
2880 RPM A.C.Supply of 7.5HP exculding
suction / delivery pipe with nuts duly grouted
on existing C.C foundation and bolts, spring
washers of requisite size for monoblock
motor and pump (IS : 9079).

a) Material
3 phase, 7.5 HP, 415V, 50Hz., 2880 RPM each 1
centrifugal mono block pump with all taxes

Transportation Charges on Unit Cost 2%


b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 1 #REF! 1
Helper day 1 #REF! 1
Plumber day 1 #REF! 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Sundries and rounding off LS
Rate per Each
11.1.8 Supply and erecting approved make
centrifugal water pump with impeller, priming
funnel cork, companion metallic flanges, with
bolts and nuts and mounted on a common
shaft of high efficient squirrel cage Induction
BLD-ELEC-11-1

motor totally enclosed and fan cooled type


suitable to operate on 415V, 3 phase, 50Hz..
2880 RPM A.C.Supply of 10HP exculding
suction / delivery pipe with nuts duly grouted
on existing C.C foundation and bolts, spring
washers of requisite size for monoblock
motor and pump (IS : 9079).

a) Material
3 phase, 10 HP, 415V, 50Hz., 2880 RPM each 1 0.00
centrifugal mono block pump with all taxes

Transportation Charges on Unit Cost 2%


b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 1 Err:509 1
Helper day 1 Err:509 1
Plumber day 1 Err:509 1
Sundries and rounding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.1.9 Supply and erecting approved make
centrifugal water pump with impeller, priming
funnel cork, companion metallic flanges, with
bolts and nuts and mounted on a common
shaft of high efficient squirrel cage Induction
BLD-ELEC-11-1

motor totally enclosed and fan cooled type


suitable to operate on 415V, 3 phase, 50Hz..
2880 RPM A.C.Supply of 15HP exculding
suction / delivery pipe with nuts duly grouted
on existing C.C foundation and bolts, spring
washers of requisite size for monoblock
motor and pump (IS : 9079).

a) Material
3 phase, 15 HP, 415V, 50Hz., 2880 RPM each 1 0.00
centrifugal Water pump with all taxes
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 1 Err:509 1
Helper day 3 Err:509 1
Plumber day 1 Err:509 1
Sundries and rounding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.2 EJECTO PUMPS
11.2.1 Supply and erecting Ejecto type water pump
single phase, 0.5HP single stage with brass
venturi and having suction pipe 40mm dia,
BLD-ELEC-11-2

pressure pipe 32mm dia and delivery pipe


32mm dia, with maximum discharge head of
80 feet including transportation of all
materials and labour charges etc., complete.

a) Material
0.5 HP, single phase, 230V, 50Hz. Ejecto each 1
type pump set. Including all taxes
M.S clamps suitable for 40mmx32mm pipes each 2
with nuts and bolts.
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Electrician day 0.5 Err:509 1
Helper day 1 Err:509 1
Fitter day 0.5 Err:509 1
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
11.2.2 Supply and erecting Ejecto type water pump
single phase, 1.0HP single stage with brass
venturi and having suction pipe 40mm dia,
BLD-ELEC-11-2

pressure pipe 32mm dia and delivery pipe


32mm dia, with maximum discharge head of
80feet including transportation of all
materials and labour charges etc., complete.

a) Material
1.0 HP, single phase, 230V, 50Hz. Ejecto each 1
type pump set. Including all taxes
M.S clamps suitable for 40mmx32mm pipes each 2
with nuts and bolts.
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Electrician day 0.5 Err:509 1
Helper day 1 Err:509 1
Fitter day 0.5 Err:509 1
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
11.2.3 Supply and erecting Ejecto type water pump
single phase, 1.5HP single stage with brass
venturi and having suction pipe 40mm dia,
BLD-ELEC-11-2

pressure pipe 32mm dia and delivery pipe


32mm dia, with maximum discharge head of
80 feet including transportation of all
materials and labour charges etc., complete.

a) Material
1.5 HP, single phase, 230V, 50Hz. Ejecto each 1
type pump set. Including all taxes
M.S clamps suitable for 40mmx32mm pipes each 2
with nuts and bolts.
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Electrician day 0.5 Err:509 1
Helper day 1 Err:509 1
Fitter day 0.5 Err:509 1
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
11.2.4 Supply and erecting Ejecto type water pump
single phase, 2.0HP single stage with brass
venturi and having suction pipe 40mm dia,
BLD-ELEC-11-2

pressure pipe 32mm dia and delivery pipe


32mm dia, with maximum discharge head of
80 feet including transportation of all
materials and labour charges etc., complete.

a) Material
2.0 HP, single phase, 230V, 50Hz. Ejecto each 1
type pump set. Including all taxes
M.S clamps suitable for 40mmx32mm pipes each 2
with nuts and bolts.
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Electrician day 0.5 #REF! 1
Helper day 1 #REF! 1
Fitter day 0.5 #REF! 1
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
11.2.6 Supply and erecting Ejecto type water pump
3 phase, 3 HP single stage with brass
BLD-ELEC-11-2

venturi and having suction pipe, pressure


pipe and delivery pipe, with maximum
discharge head of 80 feet , including
transportation, and all materials all labour
charges etc., complete.

a) Material
3.0 HP, single phase, 230V, 50Hz. Ejecto each 1
type pump set. Including all taxes
M.S clamps suitable for 40mmx32mm pipes each 2
with nuts and bolts.
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Electrician day 0.5 #REF! 1
Helper day 1 #REF! 1
Fitter day 0.5 #REF! 1
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
11.2.7 Supply and erecting Ejecto type water pump
3 phase, 5 HP single stage with brass
BLD-ELEC-11-2

venturi and having suction pipe, pressure


pipe and delivery pipe, with maximum
discharge head of 80', including
transportation, and all materials all labour
charges etc., complete.

a) Material
3Ph, 5 HP 415V, 50Hz. Ejecto pump set with each 1
all taxes
M.S clamps suitable for Air and delivery each 2
pipes with nuts and bolts.
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 0.5 #REF! 1
Helper day 1.5 #REF! 1
Plumber day 0.5 #REF! 1
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
Bldngs_Elec-11-3
11.3 SUBMERSIBLE PUMPS (Bore well type)

11.3.1 (a) Supply and erecting, ISI mark submersible


1.0 HP,Single Phase 18stages pumpset
suitable for 106 / 156mm dia borewell with
high quality water resistant and dynamically
balanced bronze impeller with stainless steel
shaft sleeves, pump coupling and pivot of
BLD-ELEC-11-3

Single phase 250V, 50Hz.. A.C. power


supply copper winding with water proof
insulation and high precision strength not to
be effected by chemical in water and
suitable bronze bearings with nut and bolts
etc., with necessary H-type clamp of
suitable size and strength.

a) Material
1HP, Single Phase 18 stage submerisible each 1
pump set including all taxes
Special M.S. clamps with bolts and nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 0.5 #REF! 1
Helper day 1 #REF! 1
Plumber day 0.5 #REF! 1
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
11.3.1 (b) Supply and erecting, ISI mark submersible
1.5 HP, Single Phase 20 stages pumpset
suitable for 106 / 156mm dia borewell with
high quality water resistant and dynamically
balanced bronze impeller with stainless steel
shaft sleeves, pump coupling and pivot of
BLD-ELEC-11-3

Single phase 250V , 50Hz.. A.C. power


supply copper winding with water proof
insulation and high precision strength not to
be effected by chemical in water and
suitable bronze bearings with nut and bolts
etc., with necessary H-type clamp of
suitable size and strength.

a) Material
1.5HP, Single Phase 20 stage submerisible each 1
pump set including all taxes
Special M.S. clamps with bolts and nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 0.5 #REF! 1
Helper day 1 #REF! 1
Plumber day 0.5 #REF! 1
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
11.3.1 (c) Supply and erecting, ISI mark submersible
2.0 HP, Single Phase 30 stages pumpset
suitable for 106 / 156mm dia borewell with
high quality water resistant and dynamically
balanced bronze impeller with stainless steel
shaft sleeves, pump coupling and pivot of
BLD-ELEC-11-3

Single phase 250V , 50Hz.. A.C. power


supply copper winding with water proof
insulation and high precision strength not to
be effected by chemical in water and
suitable bronze bearings with nut and bolts
etc., with necessary H-type clamp of
suitable size and strength.

a) Material
2HP, Single Phase 30 stage submerisible each 1
pump set including all taxes
Special M.S. clamps with bolts and nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 0.5 #REF! 1
Helper day 1 #REF! 1
Plumber day 0.5 #REF! 1
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
11.3.2 Supply and erecting, ISI mark submersible
2.0 HP, 3 Phase, 3 stages pumpset suitable
for 156mm dia borewell with high quality
water resistant and dynamically balanced
bronze impeller with stainless steel shaft
sleeves, pump coupling and pivot of 3 phase
BLD-ELEC-11-3

415V , 50Hz.. A.C. power supply copper


winding with water proof insulation and high
precision strength not to be effected by
chemical in water and suitable bronze
bearings with nut and bolts etc., with
necessary H-type clamp of suitable size and
strength.

a) Material
2HP, 3 Ph 3 stage submerisible pump set each 1
including all taxes
Special M.S. clamps with bolts and nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 1 #REF! 1
Helper day 2 #REF! 1
Plumber day 1 #REF! 1
Hire charges of tripod with winch 50% of
Labour charges
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.3.3 Supply and erecting, ISI mark submersible
3.0 HP,3 Phase, 4 stages pumpset suitable
for 156mm dia borewell with high quality
wear resistance and dynamically balanced
bronze impeller with stainless steel shaft
sleeves, pump coupling and pivot of 3 phase
BLD-ELEC-11-3

415V , 50Hz.. A.C. power supply copper


winding with water proof insulation and high
precision strength not to be effected by
chemical in water and suitable bronze
bearings with nut and bolts etc., with
necessary H-type clamp of suitable size and
strength.

a) Material
3HP, 3 Ph 4 stage submerisible pump set. each 1
Including all taxes
Special M.S. clamps with bolts and nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 1 #REF! 1
Helper day 2 #REF! 1
Plumber day 1 #REF! 1
Hire charges of tripod with winch 50% of
Labour charges
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.3.4 Supply and erecting, ISI mark submersible 3
HP, 3 Phase, 6 stages pumpset suitable for
156mm dia borewell with high quality wear
resistance and dynamically balanced bronze
impeller with stainless steel shaft sleeves,
pump coupling and pivot of 3 phase 415V ,
BLD-ELEC-11-3

50Hz.. A.C. power supply copper winding


with water proof insulation and high
precision strength not to be effected by
chemical in water and suitable bronze
bearings with nut and bolts etc., with
necessary H-type clamp of suitable size and
strength.

a) Material
3HP, 3 Ph 6 stage submerisible pump set. each 1
Including all taxes
Special M.S. clamps with bolts and nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 1 #REF! 1
Helper day 2 #REF! 1
Plumber day 1 #REF! 1
Hire charges of tripod with winch 50% of
Labour charges
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.3.5 Supply and erecting, ISI mark submersible 3
HP, 3 Phase, 8 stages pumpset suitable for
156mm dia borewell with high quality wear
resistance and dynamically balanced bronze
impeller with stainless steel shaft sleeves,
pump coupling and pivot of 3 phase 415V ,
BLD-ELEC-11-3

50Hz.. A.C. power supply copper winding


with water proof insulation and high
precision strength not to be effected by
chemical in water and suitable bronze
bearings with nut and bolts etc., with
necessary H-type clamp of suitable size and
strength.

a) Material
3HP, 3 Ph 6 stage submerisible pump set. each 1
Including all taxes
Special M.S. clamps with bolts and nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 1 #REF! 1
Helper day 2 #REF! 1
Plumber day 1 #REF! 1
Hire charges of tripod with winch 50% of
Labour charges
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.3.6 Supply and erecting, ISI mark submersible 3
HP, 3 Phase, 9 stages pumpset suitable for
156mm dia borewell with high quality wear
resistance and dynamically balanced bronze
impeller with stainless steel shaft sleeves,
pump coupling and pivot of 3 phase 415V ,
BLD-ELEC-11-3

50Hz.. A.C. power supply copper winding


with water proof insulation and high
precision strength not to be effected by
chemical in water and suitable bronze
bearings with nut and bolts etc., with
necessary H-type clamp of suitable size and
strength.

a) Material
3HP, 3 Ph 6 stage submerisible pump set each 1
Including all taxes
Special M.S. clamps with bolts and nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 1 #REF! 1
Helper day 2 #REF! 1
Plumber day 1 #REF! 1
Hire charges of tripod with winch 50% of
Labour charges
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.3.7 Supply and erecting, ISI mark submersible 4
HP, 3 Phase, 6 stages pumpset suitable for
156mm dia borewell with high quality wear
resistance and dynamically balanced bronze
impeller with stainless steel shaft sleeves,
pump coupling and pivot of 3 phase 415V,
BLD-ELEC-11-3

50Hz.. A.C. power supply copper winding


with water proof insulation and high
precision strength not to be effected by
chemical in water and suitable bronze
bearings with nut and bolts etc., with
necessary H-type clamp of suitable size and
strength.

a) Material
4HP, 3 Ph 6 stage submerisible pump set each 1
including all taxes
Special M.S. clamps with bolts and nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 1 #REF! 1
Helper day 2 #REF! 1
Plumber day 1 #REF! 1
Hire charges of tripod with winch 50% of
Labour charges
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.3.8 Supply and erecting, ISI mark submersible 4
HP, 3 Phase, 12 stages pumpset suitable for
156mm dia borewell with high quality wear
resistance and dynamically balanced bronze
impeller with stainless steel shaft sleeves,
pump coupling and pivot of 3 phase 415V,
BLD-ELEC-11-3

50Hz.. A.C. power supply copper winding


with water proof insulation and high
precision strength not to be effected by
chemical in water and suitable bronze
bearings with nut and bolts etc., with
necessary H-type clamp of suitable size and
strength.

a) Material
4HP, 3 Ph 12 stages submerisible pump set each 1
Including all taxes
Special M.S. clamps with bolts and nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 1 #REF! 1
Helper day 2 #REF! 1
Plumber day 1 #REF! 1
Hire charges of tripod with winch 50% of
Labour charges
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.3.10 Supply and erecting, ISI mark submersible 5
HP, 3 Phase, 8 stages pumpset suitable for
156mm dia borewell with high quality wear
resistance and dynamically balanced bronze
impeller with stainless steel shaft sleeves,
pump coupling and pivot of 3 phase 415V,
BLD-ELEC-11-3

50Hz.. A.C. power supply copper winding


with water proof insulation and high
precision strength not to be effected by
chemical in water and suitable bronze
bearings with nut and bolts etc., with
necessary H-type clamp of suitable size and
strength.

a) Material
Cost of 3 Ph, 5 HP, 8 St. S.M pumpset each 1
Special Clamps with Bolts & Nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 2 #REF! 1
Helper day 3 #REF! 1
Plumber day 1 #REF! 1
Hire charges of tripod with winch 50% of
Labour charges
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.3.11 Supply and erecting, ISI mark submersible 5
HP, 3 Phase, 13 stages pumpset suitable for
156mm dia borewell with high quality wear
resistance and dynamically balanced bronze
impeller with stainless steel shaft sleeves,
pump coupling and pivot of 3 phase 415V ,
BLD-ELEC-11-3

50Hz.. A.C. power supply copper winding


with water proof insulation and high
precision strength not to be effected by
chemical in water and suitable bronze
bearings with nut and bolts etc., with
necessary H-type clamp of suitable size and
strength.

a) Material
Cost of 3 Ph, 5 HP, 8 St. S.M pumpset each 1
Special Clamps with Bolts & Nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 2 #REF! 1
Helper day 3 #REF! 1
Plumber day 1 #REF! 1
Hire charges of tripod with winch 50% of
Labour charges
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.3.12 Supply and erecting, ISI mark submersible
7.5 HP,3 Phase, 6 stages pumpset suitable
for 156mm dia borewell with high quality
wear resistance and dynamically balanced
bronze impeller with stainless steel shaft
sleeves, pump coupling and pivot of 3 phase
BLD-ELEC-11-3

415V, 50Hz.. A.C. power supply copper


winding with water proof insulation and high
precision strength not to be effected by
chemical in water and suitable bronze
bearings with nut and bolts etc., with
necessary H-type clamp of suitable size and
strength.

a) Material
3 Ph, 7.5 HP, 6 St. S.M pumpset each 1
Special Clamps with Bolts & Nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 2 #REF! 1
Helper day 3 #REF! 1
Plumber day 1 #REF! 1
Hire charges of tripod with winch 50% of
Labour charges
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.3.13 Supply and erecting, ISI mark submersible
7.5 HP, 3 Phase, 12 stages pumpset
suitable for 156mm dia borewell with high
quality wear resistance and dynamically
balanced bronze impeller with stainless steel
shaft sleeves, pump coupling and pivot of 3
BLD-ELEC-11-3

phase 415V , 50Hz.. A.C. power supply


copper winding with water proof insulation
and high precision strength not to be
effected by chemical in water and suitable
bronze bearings with nut and bolts etc., with
necessary H-type clamp of suitable size and
strength.

a) Material
3 Ph, 7.5 HP, 12 St. S.M pumpset each 1
Special Clamps with Bolts & Nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 2 #REF! 1
Helper day 3 #REF! 1
Plumber day 1 #REF! 1
Hire charges of tripod with winch 50% of
Labour charges
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.3.15 Supply and erecting, ISI mark submersible
10 HP,3 Phase, 12 stages pumpset suitable
for 156mm dia borewell with high quality
wear resistance and dynamically balanced
bronze impeller with stainless steel shaft
sleeves, pump coupling and pivot of 3 phase
BLD-ELEC-11-3

415V, 50Hz.. A.C. power supply copper


winding with water proof insulation and high
precision strength not to be effected by
chemical in water and suitable bronze
bearings with nut and bolts etc., with
necessary H-type clamp of suitable size and
strength.

a) Material
Cost of 3 Ph,10 H.P 12St. S.M pumpset each 1
Special Clamps with Bolts & Nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 2 #REF! 1
Helper day 3 #REF! 1
Plumber day 1 #REF! 1
Hire charges of tripod with winch 50% of
Labour charges
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.3.16 Supply and erecting, ISI mark submersible
10 HP,3 Phase,16 stages pumpset suitable
for 156mm dia borewell with high quality
wear resistance and dynamically balanced
bronze impeller with stainless steel shaft
sleeves, pump coupling and pivot of 3 phase
BLD-ELEC-11-3

415V, 50Hz.. A.C. power supply copper


winding with water proof insulation and high
precision strength not to be effected by
chemical in water and suitable bronze
bearings with nut and bolts etc., with
necessary H-type clamp of suitable size and
strength.

a) Material
Cost of 3 Ph,10 H.P 16 St. S.M pumpset each 1
Special Clamps with Bolts & Nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 2 #REF! 1
Helper day 3 #REF! 1
Plumber day 1 #REF! 1
Hire charges of tripod with winch 50% of
Labour charges
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.3.17 Supply and erecting, ISI mark submersible
15 HP, 3 Phase, 15 stages pumpset suitable
for 156mm dia borewell with high quality
wear resistance and dynamically balanced
bronze impeller with stainless steel shaft
sleeves, pump coupling and pivot of 3 phase
BLD-ELEC-11-3

415V, 50Hz.. A.C. power supply copper


winding with water proof insulation and high
precision strength not to be effected by
chemical in water and suitable bronze
bearings with nut and bolts etc., with
necessary H-type clamp of suitable size and
strength.

a) Material
Cost of 3 Ph,15 H.P 15 St. S.M pumpset each 1
Special Clamps with Bolts & Nuts each 2
Transportation Charges on Unit Cost 2%
b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 2 #REF! 1
Helper day 4 #REF! 1
Plumber day 1 #REF! 1
Hire charges of tripod with winch 50% of
Labour charges
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.4 SUB MERSIBLE PUMPS (OPEN WELL)
11.4.1 Supply and erecting ISI make submersible
pumpset suitable for erection in open well
with water resistant dynamically balanced
impeller with stainless steel shaft sleeves,
pump coupling and pivot with squirrel cage
Induction Motor of 3 phase, 415V, 50Hz..,
A.C.Supply, heavy copper windings with
BLD-ELEC-11-4

water proof insulation and high precision


strength not to be effected by chemicals in
water with suitable bronze bearings, 3 HP
pump erected with necessary H-type
clamps of suitable size and strength
including cost of all materials, Transportation
and labour charges etc., complete.

a) Material
ELEC-5.7.5 3 Ph, 3HP Submersible motor each 1 17850.00 1

ELEC-10.7.48c Special clamps with nut and bolis each 2 30.00 1

MS Girders across the open well to support


delivery pipe clamps (as per requirement)

Transportation Charges on Unit Cost 2%


b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 1 Err:509 1
Helper day 2 Err:509 1
Plumber day 1 Err:509 1
Hire charges of tripod with winch 50% of
Labour charges
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.4.2 Supply and erecting ISI make submersible
pumpset suitable for erection in open well
with water resistant dynamically balanced
impeller with stainless steel shaft sleeves,
pump coupling and pivot with squirrel cage
Induction Motor of 3 phase, 415V, 50Hz..,
A.C.Supply, heavy copper windings with
BLD-ELEC-11-4

water proof insulation and high precision


strength not to be effected by chemicals in
water with suitable bronze bearings, 5 HP
pump erected with necessary H-type
clamps of suitable size and strength
including cost of all materials, Transportation
and labour charges etc., complete.

a) Material
ELEC-5.8.4 3 Ph, 5HP Submersible motor each 1 21000.00 1

ELEC-10.7.48c Special clamps with nut and bolis each 2 30.00 1


MS Girders across the open well to support
delivery pipe clamps (as per requirement)

Transportation Charges on Unit Cost 2%


b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 1 Err:509 1
Helper day 2 Err:509 1
Plumber day 1 Err:509 1
Hire charges of tripod with winch 50% of
Labour charges
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.4.3 Supply and erecting ISI make submersible
pumpset suitable for erection in open well
with water resistant dynamically balanced
impeller with stainless steel shaft sleeves,
pump coupling and pivot with squirrel cage
Induction Motor of 3 phase, 415V, 50Hz..,
A.C.Supply, heavy copper windings with
BLD-ELEC-11-4

water proof insulation and high precision


strength not to be effected by chemicals in
water with suitable bronze bearings, 7.5 HP
pump erected with necessary H-type
clamps of suitable size and strength
including cost of all materials, Transportation
and labour charges etc., complete.

a) Material
ELEC-5.8.6 3 Ph, 7.5HP Submersible motor each 1 25000.00 1

ELEC-10.7.48c Special clamps with nut and bolis each 2 30.00 1


MS Girders across the open well to support
delivery pipe clamps (as per requirement)

Transportation Charges on Unit Cost 2%


b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 1 Err:509 1
Helper day 2 Err:509 1
Plumber day 1 Err:509 1
Hire charges of tripod with winch 50% of
Labour charges
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
11.4.4 Supply and erecting ISI make submersible
pumpset suitable for erection in open well
with water resistant dynamically balanced
impeller with stainless steel shaft sleeves,
pump coupling and pivot with squirrel cage
Induction Motor of 3 phase, 415V, 50Hz..,
A.C.Supply, heavy copper windings with
BLD-ELEC-11-4

water proof insulation and high precision


strength not to be effected by chemicals in
water with suitable bronze bearings, 10 HP
pump erected with necessary H-type
clamps of suitable size and strength
including cost of all materials, Transportation
and labour charges etc., complete.

a) Material
ELEC-5.8.7 3 Ph, 10 HP Submersible motor each 1 33600.00 1

ELEC-10.7.48c Special clamps with nut and bolis each 2 30.00 1


MS Girders across the open well to support
delivery pipe clamps (as per requirement)

Transportation Charges on Unit Cost 2%


b) Labour charges for erection of pump
set including pipe connection for suction
& delivery
Skilled Fitter day 1 Err:509 1
Helper day 3 Err:509 1
Plumber day 1 Err:509 1
Hire charges of tripod with winch 50% of
Labour charges
Sundries and rouding off LS
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note:- Above rates of pumpsets are exculding
11.5 suction & delivery pipes
ACCESSORIES
11.5.1 Providing cement concrete with 1:2:4
BLD-ELEC-11-5

foundation for pump and motor with required


size and length of foundation bolts and nuts
including cost and conveyance of all
materials and labour charges etc.,
complete.

a) Material
Rate as per Civil SSR, since it is a Civil
item.
11.5.2 Supplying and erecting D.O.L Starter 250V,
Single phase, 50Hz. With SS enclouser
comprising of contactor with bi-metalic relay
with necessary push buttons, transportation
and all labour charges etc., complete .

a) Material
ELEC-5.4.1 D.O.L. Starter 1Ph, 250V each 1 780.00 1

b) Labour charges for fixing and giving


connections.
Skilled Electrician day 0.33 Err:509 1
Helper day 0.33 Err:509 1
Sunries such, as bolts, nuts and rounding off

Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 3 jobs /
day
11.5.2(a) Supplying and erecting D.O.L Starter 400V,
BLD-ELEC-11-5

3 phase, 50Hz. enclosed with no volt coil


and overload protection with necessary
materials, transportation and all labour
charges etc., complete suitable upto 3/4/5
HP.

a) Material
ELEC-5.4.2 D.O.L. Starter 3Ph, 415V upto 3/4/5HP each 1 1450.00 1

b) Labour charges for fixing and giving


connections.
Skilled Electrician day 0.33 Err:509 1
Helper day 0.33 Err:509 1
Sunries such, as bolts, nuts and rounding off

Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 3 jobs /
day
11.5.3 Supply and fixing of approved make semi
automatic hand operated 3ph, 415V star -
BLD-ELEC-11-5

delta started suitable from 7.5 HP upto 15


HP motor totally enclosed with over load
protection and No-volt relay etc., to
complete including Transportation and all
labour charges.

a) Material
Semi automatic 3Ph, Induction motor with each 1
enclosure (Including of all taxes with
Transportation)
b) Labour charges for fixing and giving
connections.
Skilled Electrician day 0.5 #REF! 1
Helper day 0.5 #REF! 1
Sunries such, as bolts, nuts and rounding off

Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
11.5.4 Supply and fixing of approved make semi
automatic hand operated 3ph, 415V star -
BLD-ELEC-11-5

delta started suitable upto 15 to 25 HP motor


totally enclosed with over load protection
and No-volt relay etc., to complete including
Transportation and all labour charges.

a) Material
Deduct
Cost of semi Automatic star - Delta starter each 1

Semi automatic 3Ph, Induction motor with each 1


enclosure (Including of all taxes with
Transportation)
b) Labour charges.
Skilled Electrician day 0.5 #REF! 1
Helper day 0.5 #REF! 1
Sunries such, as bolts, nuts and rounding off

Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
11.5.5 Supply and fixing of approved make
automatic operated 3ph, 415V star - delta
BLD-ELEC-11-5

started suitable 10 to 12.5 HP automatic


star delta starter motor totally enclosed with
over load protection and No-volt relay to
complete including Transportation and all
labour charges .

a) Material
Cost of semi Automatic star - Delta starter each 1

Semi automatic 3Ph, Induction motor with each 1


enclosure (Including of all taxes with
Transportation)
b) Labour charges.
Skilled Electrician day 0.5 #REF! 1
Helper day 0.5 #REF! 1
Sunries such, as bolts, nuts and rounding off

Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
11.5.6 Supply and fixing of approved make semi
automatic hand operated 3ph, 415V star -
BLD-ELEC-11-5

delta started suitable for 15 HP fully


automatic star delta motor totally enclosed
with over load protection and No-volt relay
to complete including Transportation and all
labour charges.

a) Material
Cost of semi Automatic star - Delta starter each 1

Semi automatic 3Ph, Induction motor with each 1


enclosure (Including of all taxes with
Transportation)
b) Labour charges.
Skilled Electrician day 0.5 #REF! 1
Helper day 0.5 #REF! 1
Sunries such, as bolts, nuts and rounding off

Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
11.5.7 Supply and erecting directly operated single
BLD-ELEC-11-5

phasing preventer connected to A.C. supply


upto 45A range with guarantee to operate on
single phase for one Year.

a) Material
Single phase parameter upto 45A (Including each 1
all taxes and Transportation)
b) Labour charges.
Skilled Electrician day 0.2 #REF! 1
Helper day 0.2 #REF! 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 5 jobs /
day
12 Bus Bars
For details, Please see after Chapter 20.

13 SWAGED POLES (Confirming to IS


2713 / 1980).
13.1 Fabrication, supply and transportation of
swaged poles up to site confirming to IS
BLD-ELEC-13-1

2713 / 1980 specifications. The pole should


be painted with primary coat of red oxide
and black bituminous paint up to ground
level with base plate, including cost of all
materials etc., complete.

a) Material
ELEC-7.1.1 Cost of swaged pole each 1 No 71.00 1

Add: Labour for handling Kg 213 Kg 0 1


Transportation charges, loading unloading
as per Common SSR taking 250Km as
average load considering fabrication point at
hyd and Visakhapatnam.
Transportation charges upto 250Km Km/ton 60 Km 0.00 60
Breakup.
P.No. 156 of Common SSR (Civil)
Upto 20 Km
163.80 / Tonne
Upto 50 Km 3.40 x 10
Upto 80 Km 2.80 x 50
Beyond 106 Km 2.20 x 156
Loading 50 / Tonne
Unloading 00 / Tonne
Stacking 00 / Tonne
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Kg

D A T A F O R M . S S W A G E D P O L E S C O N F I R M I N G TO I.S : 2713 /1980

Data Specification of pole as per IS 2713 / Planting Length of Sections In Mtrs.


No.
1980 & Overall length of pole. depth in Bottom Middle
1 2 mtrs.4 5a 5b
3
1 13.1.1 410 SP.2 7 Mtrs. 1.25 4.00 1.50
2 13.1.2 410 SP.3 7 Mtrs. 1.25 4.00 1.50
3 13.1.3 410 SP.5 7.5 Mtrs. 1.25 4.50 1.50
4 13.1.4 410 SP.6 7.5 Mtrs. 1.25 4.50 1.50
5 13.1.5 410 SP.11 8 Mtrs. 1.50 4.50 1.75
6 13.1.6 410 SP.12 8 Mtrs. 1.50 4.50 1.75
7 13.1.7 410 SP.26 9 Mtrs. 1.50 5.00 2.00
8 13.1.8 410 SP.27 9 Mtrs. 1.50 5.00 2.00
9 13.1.9 410 SP.41 10 Mtrs. 1.80 5.20 2.40
10 13.1.10 410 SP.42 10 Mtrs. 1.80 5.20 2.40
11 13.1.11 410 SP.50 11 Mtrs. 1.80 5.60 2.70
12 13.1.12 410 SP.51 11 Mtrs. 1.80 5.60 2.70
13 13.1.13 410 SP.59 12 Mtrs. 2.00 5.80 3.10
14 13.1.14 410 SP.60 12 Mtrs. 2.00 5.80 3.10
15 13.1.15 410 SP.73 14.5 Mtrs. 2.00 6.50 4.00
16 13.1.16 410 SP.74 14.5 Mtrs. 2.00 6.50 4.00
17 13.1.17 410 SP.77 16 Mtrs. 2.30 7.00 4.50
18 13.1.18 410 SP.78 16 Mtrs. 2.30 7.00 4.50
O.D and thickness Weight of Pole Weight Total Rate/ Kg
in Kgs
Bottom Middle Top of weight in including
6a 6b 6c 7 Base8 Kgs. 9 Transportat
10
1 114.3x4.5 88.9x4.05 76.1x3.25 73 5 78
2 114.3x5.4 88.9x4.85 76.1x3.25 85 5 90
3 114.3x4.5 88.9x4.05 76.1x3.25 79 5 84
4 114.3x5.4 88.9x4.85 76.1x3.25 93 5 98
5 114.3x4.5 88.9x4.05 76.1x3.25 83 5 88
6 114.3x5.4 88.9x4.85 76.1x3.25 97 5 102
7 114.3x45 88.9x4.05 76.1x3.25 92 5 97
8 114.3x5.4 88.9x4.85 76.1x3.25 108 5 113
9 139.7x4.85 114.3x4.5 88.9x3.25 135 5 140
10 139.7x5.4 114.3x4.5 88.9x3.25 144 5 149
11 139.7x4.85 114.3x4.5 88.9x3.25 147 5 152
12 139.7x5.4 114.3x4.5 88.9x3.25 164 5 169
13 165.1x4.85 139.7x4.5 114.3x3.65 197 5 202
14 165.1x5.4 139.7x4.5 114.3x3.65 208 5 213
15 193.7x5.4 165.1x4.85 139.7x4.50 312 10 322
16 193.7x5.9 165.1x5.4 139.7x4.50 336 10 346
17 193.7x5.4 165.1x4.85 139.7x4.50 341 10 351
18 193.7x5.9 165.1x5.4 139.7x4.50 367 10 377

Bldngs_Elec-13-2
13.2 Garden Posts
13.2.1 Fabrication and Supply of M.S. Poles for
garden posts with 'B' class 4mtrs long
BLD-ELEC-13-2

60.25mm outer dia with base plate and


suitable pole cap including cost and
conveyance of all material including fixing of
luminaire and labour charges etc., complete.

a) Material
4Mtrs 'B' Class M.S. pipe of 60.25mm dia Kg 24.8
with base plate and suitable pole cap
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
13.2.2 Fabrication and Supply of M.S. Poles for
garden posts with 'B' class 6 mtrs long
BLD-ELEC-13-2

60.25mm outer dia with base plate and


suitable pole cap including cost and
conveyance of all material including fixing of
luminaire and labour charges etc., complete.

a) Material
ELEC-7.1.2 6Mtrs 'B' Class M.S. pipe of 60.25mm dia Kg 37.2 65.00 1
with base plate and suitable pole cap -
Sub total
add for over heads @ 13.6%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
13.3 Brackets
13.3.1 Supply and fixing of 50mm dia 0.5 mtrs
BLD-ELEC-13-3

single arm M.S. pipe bracket with sleeve and


fasteners with necessary angle including
painting etc., complete on existing pole
including fixing of luminaire.
a) Material
ELEC-7.1.3 0.5Mtr length 50mm 'B' class pipe. Kg 2.55 65.00 1
45cm length , 10cm dia and cap. Kg 5.4 65.00 1
Painting with red oxid and enamel paint. job 1
b) Labour charges for fixing with Spl. T &
P
Skilled Electrician day 0.2 648.00 1
Fitter day 0.2 648.00 1
Sub total
add for over heads @ 13.6%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 5 jobs /
day
13.3.2 Supply and fixing of 50mm dia 0.5 mtrs
BLD-ELEC-13-3

double arm M.S. pipe bracket with sleeve


and fasteners with necessary angle
including painting etc., complete on existing
pole including fixing of luminaire
a) Material
2 x 0.5Mtr length 50mm 'B' class pipe. Kg 5.1
45cm length , 10cm dia and cap. Kg 5.4
Painting with red oxid and enamel paint. job 1
b) Labour charges for fixing with Spl. T &
P
Skilled Electrician day 0.33 #REF! 1
Fitter day 0.33 #REF! 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 3 jobs /
day
13.3.3 Supply and fixing of 50mm dia 0.5 mtrs
BLD-ELEC-13-3

triple arm M.S. pipe bracket with sleeve and


fasteners with necessary angle including
painting etc., complete on existing pole
including fixing of luminaire.
a) Material
3 x 0.5Mtr length 50mm 'B' class pipe. Kg 7.65
45cm length , 10cm dia and cap. Kg 5.4
Painting with red oxid and enamel paint. job 1
b) Labour charges for fixing with Spl. T &
P
Skilled Electrician day 0.5 #REF! 1
Fitter day 0.5 #REF! 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
13.3.4 Supply and fixing of 50mm dia 1 mtrs single
BLD-ELEC-13-3

arm M.S. pipe bracket with sleeve and


fasteners with necessary angle including
painting etc., complete on existing pole
including fixing of luminaire
a) Material
ELEC-6.1.8 1Mtr length 50mm 'B' class M.S pipe. Kg 5.1 #REF! 1
45cm length , 10cm dia and cap. Kg 5.4
Painting with red oxid and anamel paint. job 1
b) Labour charges for fixing with Spl. T &
P
Skilled Electrician day 0.2 #REF! 1
Fitter day 0.2 #REF! 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 5 jobs /
day
13.3.5 Supply and fixing of 50mm dia 1 mtrs
BLD-ELEC-13-3

double arm M.S. pipe bracket with sleeve


and fasteners with necessary angle
including painting etc., complete on existing
pole including fixing of luminaire.
a) Material
ELEC-6.1.10 2 x 1Mtr length 50mm 'B' class M.S pipe. Kg 10.2 #REF!
45cm length , 10cm dia and cap. Kg 5.4
Painting with red oxid and anamel paint. job 1
b) Labour charges for fixing with Spl. T &
P
Skilled Electrician day 0.33 #REF! 1
Helper day 0.33 #REF! 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 3 jobs /
day
13.3.6 Supply and fixing of 50mm dia 1 mtrs triple
BLD-ELEC-13-3

arm M.S. pipe bracket with sleeve and


fasteners with necessary angle including
painting etc., complete on existing pole
including fixing of luminaire.
a) Material
3 x 1Mtr length 50mm 'B' class M.S pipe. Kg 15.3 0.00
45cm length , 10cm dia and cap. Kg 5.4
Painting with red oxid and anamel paint. job 1
b) Labour charges for fixing with Spl. T &
P
Skilled Electrician day 0.5 #REF! 1
Helper day 0.5 #REF! 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
13.3.7 Supply and fixing of 50mm dia 1.5 mtrs
BLD-ELEC-13-3

single arm M.S. pipe bracket with sleeve and


fasteners with necessary angle including
painting etc., complete on existing pole
including fixing of luminaire.
a) Material
ELEC-6.1.9 1.5 Mtr length 50mm 'B' class M.S pipe. Kg 7.65 #REF!
45cm length , 10cm dia and cap. Kg 5.4
Painting with red oxid and anamel paint. job 1
b) Labour charges for fixing with Spl. T &
P
Skilled Electrician day 0.2 #REF! 1
Helper day 0.2 #REF! 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 5 jobs /
day
13.3.8 Supply and fixing of 50mm dia 1.5 mtrs
BLD-ELEC-13-3

double arm M.S. pipe bracket with sleeve


and fasteners with necessary angle
including painting etc., complete on existing
pole including fixing of luminaire.
a) Material
ELEC-6.1.11 2 x 1.5Mtr length 50mm 'B' class M.S pipe. Kg 15.3 #REF!

45cm length , 10cm dia and cap. Kg 5.4


Painting with red oxid and anamel paint. job 1
b) Labour charges for fixing with Spl. T &
P
Skilled Electrician day 0.33 #REF! 1
Helper day 0.33 #REF! 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 3 jobs /
day
13.3.9 Supply and fixing of 50mm dia 1.5 mtrs
BLD-ELEC-13-3

triple arm M.S. pipe bracket with sleeve and


fasteners with necessary angle including
painting etc., complete on existing pole
including fixing of luminaire.
a) Material
3 x 1.5Mtr length 50mm 'B' class M.S pipe. Kg 22.95 0.00

45cm length , 10cm dia and cap. Kg 5.4


Painting with red oxid and anamel paint. job 1
b) Labour charges for fixing with Spl. T &
P
Skilled Electrician day 0.5 #REF! 1
Helper day 0.5 #REF! 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
13.3.10 Supply and fixing of 50mm dia 1.5 mtrs
BLD-ELEC-13-3

curved single arm M.S. pipe bracket with


sleeve and fasteners with necessary angle
including painting etc., complete on existing
pole including fixing of luminaire.
a) Material
1.5 Mtr length 50mm 'B' class M.S pipe. Kg 7.65
45cm length , 10cm dia and cap. Kg 5.4
Painting with red oxid and anamel paint. job 1
b) Labour charges for fixing with Spl. T &
P
Skilled Electrician day 0.2 #REF! 1
Helper day 0.2 #REF! 1
For Moulding & making Suitable curve on job 1
length
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 5 jobs /
day
13.3.11 Supply and fixing of 50mm dia 1.5 mtrs
BLD-ELEC-13-3

curved double arm M.S. pipe bracket with


sleeve and fasteners with necessary angle
including painting etc., complete on existing
pole including fixing of luminaire.
a) Material
2 x 1.5 Mtr length 50mm 'B' class M.S pipe. Kg 15.3

45cm length , 10cm dia and cap. Kg 5.4


Painting with red oxid and anamel paint. job 1
b) Labour charges for fixing with Spl. T &
P
Skilled Electrician day 0.33 #REF! 1
Helper day 0.33 #REF! 1
For Moulding & making Suitable curve on job 1
length
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 3 jobs /
day
13.3.12 Supply and fixing of 50mm dia 1.5 mtrs
BLD-ELEC-13-3

curved triple arm M.S. pipe bracket with


sleeve and fasteners with necessary angle
including painting etc., complete on existing
pole including fixing of luminaire.
a) Material
3 x 1.5 Mtr length 50mm 'B' class M.S pipe. Kg 22.95

45cm length , 10cm dia and cap. Kg 5.4


Painting with red oxid and anamel paint. job 1
b) Labour charges for fixing with Spl. T &
P
Skilled Electrician day 0.5 #REF! 1
Helper day 0.5 #REF! 1
For Moulding & making Suitable curve on job 1
length
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
13.4 Erection Charges for Swaged Poles
13.4.1 Erection charges for 7 mtrs. to 8 mts long
swaged pole including excavation of pit, coil
BLD-ELEC-13-4

earthing, hire charges of special T&P


painting of Pole CC 1:3:6 upto ground and
1:2:4 for Couping work, including labour and
transportation charges etc., complete

a) Material
Pit excavation 156 Cmx 60Cmx60cm.(Civil S cum 0.54
C.C.work for pit 1:3:6 (Civil SSR) cum 0.54
Couping 1:2:4 (Civil SSR) cum 0.054
Painting with red oxid and enamel paint. M 6.2
Coil earthing each 1
b) Labour charges
Skilled Electrician day 0.33 #REF! 1
Helper day 2.67 #REF! 1
Mason day 0.33 #REF! 1
Hire charges for Spl.T&P 40% on labour cost
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 3 jobs /
day
13.4.2(a) Erection charges for 9 mtrs to 11 mtrs long
swaged pole including excavation of pit, coil
BLD-ELEC-13-4

earthing, hire charges of special T&P


painting of Pole CC 1:3:6 upto ground and
1:2:4 for Couping work, including labour and
transportation charges etc., complete.

a) Material
Pit excavation 156 Cmx 60Cmx60cm.(Civil S cum 0.72
C.C.work for pit 1:3:6 (Civil SSR) cum 0.72
Couping 1:2:4 (Civil SSR) cum 0.054
Painting with red oxid and enamel paint. M 8.35
Coil earthing each 1
b) Labour charges
Skilled Electrician day 0.33 #REF! 1
Helper day 2.67 #REF! 1
Mason day 0.33 #REF! 1
Hire charges for Spl.T&P 40% on labour cost
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 3 jobs /
day
13.4.2(b) Erection charges for 12 Mts to 14Mts long
swaged pole including excavation of pit, coil
BLD-ELEC-13-4

earthing, hire charges of special T&P


(Crane)painting of Pole CC 1:3:6 upto
ground and 1:2:4 for Couping work,
including labour and transportation charges
etc., complete.

a) Material
Pit excavation 2.0x1.0x1.0Mtr cum 2
1:3:6 CC Work cum 2
couping 1:2:4 cum 0.054
Painting with red oxid and alluminum paint. M 12

Coil earthing each 1


b) Labour charges
Skilled Electrician day 0.5 #REF! 1
Helper day 4 #REF! 1
Mason day 0.5 #REF! 1
Hire charges for Spl.T&P 20% on labour cost
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
13.4.3 Erection charges for 16Mts long swaged
pole including excavation of pit, coil earthing,
BLD-ELEC-13-4

hire charges of special T&P (Crane)painting


of Pole CC 1:3:6 upto ground and 1:2:4 for
Couping work, including labour and
transportation charges etc., complete.

a) Material
Pit excavation 2.30x1.0x1.0Mtr cum 2.3
1:3:6 CC Work cum 2.3
couping 1:2:4 cum 0.054
Painting with red oxid and alluminum paint. M 14

Coil earthing each 1


b) Labour charges
Skilled Electrician day 0.5 #REF! 1
Helper day 4 #REF! 1
Mason day 0.5 #REF! 1
Hire charges for Spl.T&P 20% on labour cost
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
13.4.4 Erection charges for 7to 9Mts long swaged
pole on bridge kerb portion ( R.C.C. work
with V.C.C. M.15 concrete with 3 Nos 25x6
BLD-ELEC-13-4

mm MS Special clamps bolts with nuts and


locking nuts etc.including cost and con
veyance of all material and all labour
charges etc. complete with painting.

a) Material
Painting with red oxid and enamel paint. M 6.2
Coil earthing each 1
3 Nos, 25 x 6 mm MS Special Clamps of 1 M Kg 3.54
Length each @ 1.18 Kg
VCC M 15 Concrete 0.5 x 0.3 x 0.9 cum 0.135
b) Labour charges
Skilled Electrician day 0.33 #REF! 1
Helper day 2.67 #REF! 1
Mason day 0.33 #REF! 1
Fanrication of clamps kgs 3.54
Hire charges for Spl.T&P 20% on labour cost
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 3 jobs /
day
13.4.5 Erection charges for 4 Mtrs. Long MS / GI
BLD-ELEC-13-4

Garden post including excavation of pit,


concreting 1:3:6 and painting including cost
and conveyance of all materials including
fixing of luminaire and labour charges etc.,
complete.

a) Material
Pit excavation (0.4x0.4x1.0 mtr) cum 0.16
Painting with red oxide and enamel paint. M 2.5
1:3:6 C.C work. cum 0.16
b) Labour charges
Mason day 0.2 #REF! 1
Helper day 0.4 #REF! 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 5 jobs /
day
13.4.6 Erection charges for 6Mtrs. Long MS / GI
BLD-ELEC-13-4

Garden post including excavation of pit,


concreting 1:3:6 and painting including cost
and conveyance of all materials including
fixing of luminaire and labour charges etc.,
complete.

a) Material
9.1.50 Pit excavation ( 0.45x0.45x1.25) cum 0.25 220.00 1
1: 3: 6 C.C. work cum 0.25 4420.33 1
Painting with red oxide and enamel paint M 4.75 0.20 63.75 1
b) Labour charges
Mason day 0.2 #REF! 1
Helper day 0.4 #REF! 1
Sub total
add for over heads @ 13.6%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 5 jobs /
day
13.4.7 Fabrication, supply and fixing of luminaire
carriage, made with 50mm dia M.S. 'B' class
pipe, moulded to 6 feet dia ring wheel, and
40mm dia M.S support pieces on 4 sides
inside the wheel and necessary size of M.S
BLD-ELEC-13-4

pole cap for fixing the ring wheel on the


156mm dia M.S. pole for fixing floodlight and
gear box with suitable nut & bolts and
painted with Red Oxide and Aluminium paint
including cost & conveyance of all materials
etc., complete.
a) Material
50mm 'B' class MS pipe of 5.7mts (1Mt=5.10 Kg 29.07
40mm 'B' glass pipe MS pipe of 3.6Mtr (1Mt= Kg 13
200mm MS pipe for pole cap.C-Class (heavy Kg 13
Special bolts and nuts 6" length. each 12
Painting with red oxide and enamel paint etc., Job 1
b) Labour charges
Fitter day 0.5 #REF! 1
Helper day 4 #REF! 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
day
13.5 Accessories
13.5.1 Supply and fixing of 300mm x 260mm x
140mm No.16 gauge CRCA sheet box with
hinged door and locking arrangements and
BLD-ELEC-13-5

din channel for fixing 2Nos MCBs duly


powder coated with matching colour of poles
including fixing with necessary arrangments
etc., complete.

a) Material
300x260x140mm 16 guage CRCA box sqm 0.35 13500.97
finished of item (as per 14.1.2)
MCB No 2.00 512.00
Sundries as rounding off
Sub total
add for over heads @ 0%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
13.5.2 Supply and fixing of 300mm x 180mm x
140mm No.16 gauge CRCA sheet box with
hinged door and locking arrangements and
BLD-ELEC-13-5

din channel for fixing 1Nos MCBs duly


powder coated with matching colour of poles
including fixing with necessary arrangments
etc., complete.

a) Material
300x180x140mm 16 guage CRCA sheet box as sqm 0.29 4030.00 1
Sundries as rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
13.5.3 Supply and fixing of 1 No.10A SP MCB in
BLD-ELEC-13-5 existing M.S. box with Din channel, 4way
63A connector including cost & conveyance
of all materials and labour charges etc.,
complete.
a) Material
(ELEC-2.9.2) 10A SP MCB each 1 #REF! 1

4Way connector. each 1


b) Labour charges
Skilled Electrician day 0.066 #REF! 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 15 jobs /
day
13.5.4 Supply and fixing of 2 Nos 10A SP MCBs in
BLD-ELEC-13-5

existing M.S box with Din channel, 4way 63A


connector including cost & conveyance of all
materials and labour charges etc., complete.

a) Material
(ELEC-2.9.2) 10A SP MCB each 2 #REF! 1

4Way connector. each 1


b) Labour charges
Skilled Electrician day 0.066 #REF! 1
Sundries such as screws, tape
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
14 CONTROL PANEL AND METERING EQUIPMENT
14.1 CONTROL PANEL
14.1.1 Supply, Transportation, fabrication and
erection of following guage CRCA sheet
steel enclosure for power control cubicle
BLD-ELEC-14-1

panel / boxes etc., including cutting, bending


drilling, welding and reveting etc., complete
with cleaning with 7 tank process and
painting with powder coating including cost
and conveyance of all materials and labour
charges.

1) 14 SWG CRCA sheet steel enclosure


a) Material
ELEC-6.2.1 14 SWG (2mm) CRCA sheet - 1 sft (Wt of 8 kg 1.56
x 4 feet sheet, 50Kg)

Transportation charges on Material cost 2%


Fabrication including cutting, bending, 30%
drilling and Dust proof arrnagments etc.,
Cleaning of cubicals in seven tank process 40%

Painting with powder coating. 40%


Erection charges 30%
Sundires such as hardware etc.,
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per sft
BLD-ELEC-14-1

Rate per sqm


14.1.2 16 SWG CRCA sheet steel enclosure
a) Material
ELEC-6.2.2 16 SWG (2mm) CRCA sheet - 1sft (Wt of 8 x kg 1.218 374.54 1
4 feet sheet, 39Kg)
Transportation charges 2%
Fabrication including cutting, bending, 30%
drilling and Dust proof arrnagments etc.,
Cleaning of cubicals in seven tank process 40%

Painting with powder coating. 40%


Erection charges 30%
Sundires such as hardware etc.,
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per sft
BLD-ELEC-14-1

Rate per sqm


14.1.3 18 SWG CRCA sheet steel enclosure
a) Material
ELEC-6.2.3 18 SWG (2mm) CRCA sheet - 1 sft (Wt of 8 kg 0.937 #REF! 1
x 4 feet sheet, 30Kg)

Transportation charges 2%
Fabrication including cutting, bending, 30%
drilling and Dust proof arrnagments etc.,
Cleaning of cubicals in seven tank process 40%

Painting with powder coating. 40%


Erection charges 30%
Sundires such as hardware etc.,
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per sft
Rate per sqm
14.2 METERING EQUIPMENT
BLD-ELEC-14-2
14.2.1 Supply and erection of 0-500V Digital volt
meter of size 96x96mm on exisiting box /
panel board including connections etc.,
complete.
a) Material
ELEC-7.12.1 0-500 Voltmeter Degital inclusive of all each 1 2500.00 1
Taxes.
b) Labour charges for fixing &
Connections
Skilled Electrician day 0.2 Err:509 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 5 jobs /
day
BLD-ELEC-14-2

14.2.2 Supply and erection of 0-100 / 200 / 400 /


600 /1000 - 5A CT Digital Ammeter of size
96x96mm on existing box / panel board
including connections etc., complete.
a) Material
ELEC-7.12.3 96 x 96mm size Ammeter Degital inclusive of each 1 2500.00 1
all Taxes
b) Labour charges for fixing and
connections.
Skilled Electrician day 0.2 Err:509 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
BLD-ELEC-14-2

14.2.3 Supply and erection of frequency meter of


size 96x96mm on existing box / panel board
including connections etc., complete.

a) Material
ELEC-7.12.5 Frequency meter Analog / Degital inclusive each 1 4556.00 1
of all Taxes.
b) Labour charges for fixing and
connections.
Skilled Electrician day 0.2 Err:509 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
14.2.4 Supply and erection of power factor meter, 3
BLD-ELEC-14-2

phase, 4 wire balanced or unbalanced load


5A, 415V of size 96x96mm on existing box /
panel board including connections etc.,
complete.
BLD-ELEC-
a) Material
ELEC-7.12.6 Power Factor meter Analog / Degital each 1 2700.00 1
inclusive of all Taxes.
b) Labour charges for fixing and
connections.
Skilled Electrician day 0.2 Err:509 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
14.2.5 Supply and erection of L.T. 3phase
multifunction energy meter with 3 lines LCD
display of size 96x96mm for measuring all
BLD-ELEC-14-2

the parameters (voltage / Current / Power /


frequency / power factor / KW / KWH /
KVAR/ KVARH) on existing box panel board
including connections etc., complete.

a) Material
ELEC-7.12.7 L.T. 3 Ph. Multifunction energy meter each 1 10023.00 1
Analog / Degital inclusive of all Taxes.-
b) Labour charges for fixing and
connections.
Skilled Electrician day 0.33 Err:509 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 3 jobs /
day
BLD-ELEC-14-2

14.2.6 Supply and erection of selector switch for


voltmeter / Ammeter on the existing box /
panel including connections etc., complete.

a) Material
ELEC-7.12.8 Selector switch for Ammeter / Voltmeter. each 1 175.00 1

b) Labour charges for fixing and


connections.
Skilled Electrician day 0.2 Err:509 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 5 jobs /
BLD-ELEC-14-2

day
14.2.7 Supply and erection of LED indicator lamps
on the existing box / panel board.
a) Material
ELEC-7.12.9 LED indicator lamp Analog each 1 135.00 1

b) Labour charges for fixing and


connections.
Skilled Electrician day 0.1 Err:509 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 10 jobs /
day
BLD-ELEC-14-2

14.2.8 Supply and erection of LT current


transformer with bar primary 100/5A to
1000 / 5A ratio in the existing box / panel
including connections etc., complete.
a) Material
ELEC-7.12.10 L.T. C.T with bar primary 100 / 5A to 1000 / each 1 450.00 1
5A
b) Labour charges for fixing and
connections.
Skilled Electrician day 0.1 Err:509 1
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 10 jobs /
day
14.2.9 Supply and fixing of single phase energy
BLD-ELEC-14-2

Meter,240V AC,50 HZ as per IS13010 with


2.5-5 /5-10/10-20 Amps range with 200%
over load capacity complete with
connections etc., complete on the existing
board.

a) Material
ELEC-7.12.11 cost of single phase energy meter - each 1 1050.00 1

b) Labour charges for fixing and


connections.
Skilled Electrician day 0.33 Err:509 1
sunderies
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 3 jobs /
day
14.2.10 Supply and fixing of three phase energy
BLD-ELEC-14-2-10
Meter,415V AC,50 HZ as per IS13010 with
2.5-5 /5-10/10-20 Amps range with 200%
over load capacity complete with
connections etc., complete on the existing
board.

a) Material
ELEC-7.12.12 Cost of three phase energy meter each 1 3037.00 1

b) Labour charges for fixing and


connections.
Skilled Electrician day 0.33 Err:509 1
sunderies
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 3 jobs /
day
15 CABLES / CABLE GLANDS / LUGS
BLD-ELEC-15-3

15.3 CABLE GLANDS


15.3.1 Supply and Fixing of heavy duty flange type
brass cable glands for 2 to 4 core, 2.5
Sq.mm to 6 Sq.mm PVC armoured cable
with brass washers complete.
a) Material
Brass cable gland for 2-4 core, 2.5 Sqmm to each 1 0
6 Sq.mm armoured cable
b) Labour charges for fixing glands.
Semi skilled Electrician day 0.066 1
Sundireis and Rounding off
Rate per Each
Note : Labour is Considered for 15 jobs /
day
BLD-ELEC-15-3

15.3.2 Supply and Fixing of heavy duty flange type


brass cable glands for 2 to 4 core, 10
Sq.mm PVC armoured cable with brass
washers complete.
a) Material
Brass cable gland for 2-4 core, 10 Sqmm each 1 0
armoured cable
b) Labour charges for fixing glands.
Semi skilled Electrician day 0.066
Sundireis and Rounding off
Rate per Each
Note : Labour is Considered for 15 jobs /
day
15.3.3 Supply and Fixing of heavy duty flange type
BLD-ELEC-15-3

brass cable glands for 4 core, 16 Sq.mm /


3.5 core 25Sq.mm PVC armoured cable
with brass washers complete.

a) Material
Brass cable gland suitabtle for 4core 16 each 1 0
Sq.mm / 3.5 core 25 Sq.mm armoured cable

b) Labour charges for fixing glands.


Skilled Electrician day 0.066
Sundireis and Rounding off
Rate per Each
15.3.4 Supply and Fixing of heavy duty flange type
BLD-ELEC-15-3

brass cable glands for 3.5 core, 35 Sq.mm /


3.0 core 50Sq.mm PVC armoured cable
with brass washers complete.

a) Material
Brass cable gland suitabtle for 3.5core 35 each 1 0
Sq.mm / 3 core 50 Sq.mm armoured cable

b) Labour charges for fixing glands.


Skilled Electrician day 0.066
Sundireis and Rounding off
Rate per Each
Note : Labour is Considered for 15 jobs /
day
BLD-ELEC-15-3

15.3.5 Supply and Fixing of heavy duty flange type


brass cable glands for 3.5 core, 50 Sq.mm
PVC armoured cable with brass washers
complete.
a) Material
Brass cable gland suitabtle for 3.5core 50 each 1 0
Sq.mm armoured cable
b) Labour charges for fixing glands.
Skilled Electrician day 0.066
Sundireis and Rounding off
Rate per Each
Note : Labour is Considered for 15 jobs /
day
BLD-ELEC-15-3

15.3.6 Supply and Fixing of heavy duty flange type


brass cable glands for 3.5 core, 70 Sq.mm
PVC armoured cable with brass washers
complete.
a) Material
Brass cable gland suitabtle for 3.5core each 1 0
70Sq.mm armoured cable
b) Labour charges for fixing glands.
Skilled Electrician day 0.066
Helper day 0.066
Sundireis and Rounding off
Rate per Each
Note : Labour is Considered for 15 jobs /
day
BLD-ELEC-15-3

15.3.7 Supply and Fixing of heavy duty flange type


brass cable glands for 3.5 core, 95 Sq.mm
PVC armoured cable with brass washers
complete.
a) Material
Brass cable gland suitabtle for 3.5core 95 each 1 0
Sq.mm armoured cable
b) Labour charges for fixing glands.
Skilled Electrician day 0.066
Helper day 0.066
Sundireis and Rounding off
Rate per Each
Note : Labour is Considered for 15 jobs /
day
BLD-ELEC-15-3

15.3.8 Supply and Fixing of heavy duty flange type


brass cable glands for 3.5 core, 120 Sq.mm
PVC armoured cable with brass washers
complete.
a) Material
Brass cable gland suitabtle for 3.5core 120 each 1 0
Sq.mm armoured cable
b) Labour charges for fixing glands.
Skilled Electrician day 0.066
Helper day 0.066
Sundireis and Rounding off
Rate per Each
Note : Labour is Considered for 15 jobs /
day
BLD-ELEC-15-3

15.3.9 Supply and Fixing of heavy duty flange type


brass cable glands for 3.5 core, 150 Sq.mm
PVC armoured cable with brass washers
complete.
a) Material
Brass cable gland suitabtle for 3.5core 150 each 1 0
Sq.mm armoured cable
b) Labour charges for fixing glands.
Skilled Electrician day 0.083
Helper day 0.083
Sundireis and Rounding off
Rate per Each
Note : Labour is Considered for 12 jobs /
day
BLD-ELEC-15-3

15.3.10 Supply and Fixing of heavy duty flange type


brass cable glands for 3.5 core, 185 Sq.mm
PVC armoured cable with brass washers
complete.
a) Material
ELEC-4.3.1 Brass cable gland suitabtle for 3.5core 185 each 1 327.00 1
Sq.mm armoured cable
b) Labour charges for fixing glands.
Skilled Electrician day 0.083 Err:509 1
Helper day 0.083 Err:509 1
Sundireis and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 12 jobs /
day
BLD-ELEC-15-3

15.3.11 Supply and Fixing of heavy duty flange type


brass cable glands for 3.5 core, 240 Sq.mm
PVC armoured cable with brass washers
complete.
a) Material
ELEC-4.3.2 Brass cable gland suitabtle for 3.5core 240 each 1 491.00 1
Sq.mm armoured cable
b) Labour charges for fixing glands.
Skilled Electrician day 0.083 Err:509 1
Helper day 0.083 Err:509 1
Sundireis and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 12 jobs /
day
BLD-ELEC-15-3

15.3.12 Supply and Fixing of heavy duty flange type


brass cable glands for 3.5 core, 300 Sq.mm
PVC armoured cable with brass washers
complete.
a) Material
ELEC-4.3.4 Brass cable gland suitabtle for 3.5core 300 each 1 578.00 1
Sq.mm armoured cable
b) Labour charges for fixing glands.
Skilled Electrician day 0.1 Err:509 1
Helper day 0.1 Err:509 1
Sundries, such as insulated tape.
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 10 jobs /
day
BLD-ELEC-15-3

15.3.13 Supply and Fixing of heavy duty flange type


brass cable glands for 3.5 core, 400 Sq.mm
PVC armoured cable with brass washers
complete.
a) Material
ELEC-4.3.4 Brass cable gland suitabtle for 3.5core 400 each 1 654.00 1
Sq.mm armoured cable
b) Labour charges for fixing glands.
Skilled Electrician day 0.1 Err:509 1
Helper day 0.1 Err:509 1
Sundries, such as insulated tape.
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 10 jobs /
day
BLD-ELEC-15-4

15.4 CABLE LUGS:


15.4.1 Supply and fixing of crimping type copper
lugs confirming to I.S specifications for cable
upto 16 Sq.mm including nuts and bolts with
connections.
a) Material
ELEC-4.4.1 Copper Lugs upto 16 Sq.mm. each 1 22.00 1

b) Labour charges for crimping


Semi Skilled Electrician day 0.01 Err:509 1
Helper day 0.01 Err:509 1
Sundries such as bolts and nuts.
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 100
jobs / day
BLD-ELEC-15-4

15.4.2 Supply and fixing of crimping type copper


lugs confirming to I.S specifications for cable
of 25 Sq.mm including nuts and bolts with
connections.
a) Material
ELEC-4.4.2 Copper Lugs upto 25 Sq.mm. each 1 30.00 1

b) Labour charges for crimping


Semi Skilled Electrician day 0.01 Err:509 1
Helper day 0.01 Err:509 1
Sundries such as bolts and nuts.
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 100
jobs / day
BLD-ELEC-15-4

15.4.3 Supply and fixing of crimping type copper


lugs confirming to I.S specifications for cable
of 35 Sq.mm including nuts and bolts with
connections.
a) Material
ELEC-4.4.3 Copper Lugs up to 35 sqmm each 1 33.00 1

b) Labour charges for crimping


Semi Skilled Electrician day 0.013 Err:509 1
Helper day 0.013 Err:509 1
Sundries such as bolts and nuts.
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 75 jobs /
day
BLD-ELEC-15-4
15.4.4 Supply and fixing of crimping type copper
lugs confirming to I.S specifications for cable
of 50 Sq.mm including nuts and bolts with
connections.
a) Material
ELEC-4.4.4 Copper Lugs upto 50 Sq.mm. each 1 40.00 1

b) Labour charges for crimping


Semi Skilled Electrician day 0.013 Err:509 1
Helper day 0.013 Err:509 1
Sundries such as bolts and nuts.
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 75 jobs /
day
BLD-ELEC-15-4

15.4.5 Supply and fixing of crimping type copper


lugs confirming to I.S specifications for cable
of 70Sq.mm including nuts and bolts with
connections.
a) Material
ELEC-4.4.5 Copper Lugs upto 70 Sq.mm. each 1 55.00 1

b) Labour charges for crimping


Semi Skilled Electrician day 0.013 Err:509 1
Helper day 0.013 Err:509 1
Sundries such as bolts and nuts.
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 75 jobs /
day
BLD-ELEC-15-4

15.4.6 Supply and fixing of crimping type copper


lugs confirming to I.S specifications for cable
of 95 Sq.mm including nuts and bolts with
connections.
a) Material
ELEC-4.4.6 Copper Lugs up to 95 sqmm each 1 65.00 1

b) Labour charges for crimping


Semi Skilled Electrician day 0.016 Err:509 1
Helper day 0.016 Err:509 1
Sundries such as bolts and nuts.
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 60 jobs /
BLD-ELEC-15-4 day
15.4.7 Supply and fixing of crimping type copper
lugs confirming to I.S specifications for cable
of 120 Sq.mm including nuts and bolts with
connections.
a) Material
ELEC-4.4.7 Copper Lugs up to 120 sqmm each 1 88.00 1

b) Labour charges for crimping


Semi Skilled Electrician day 0.02 Err:509 1
Helper day 0.02 Err:509 1
Sundries such as bolts and nuts.
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 50 jobs /
day
BLD-ELEC-15-4

15.4.8 Supply and fixing of crimping type copper


lugs confirming to I.S specifications for cable
of 150 Sq.mm including nuts and bolts with
connections.
a) Material
ELEC-4.4.8 Copper Lugs up to 150 sqmm each 1 104.00 1

b) Labour charges for crimping


Semi Skilled Electrician day 0.033 Err:509 1
Helper day 0.033 Err:509 1
Sundries such as bolts and nuts.
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 30 jobs /
day
BLD-ELEC-15-4

15.4.9 Supply and fixing of crimping type copper


lugs confirming to I.S specifications for cable
of 185 Sq.mm including nuts and bolts with
connections.
a) Material
ELEC-4.4.9 Copper Lugs up to 185 sqmm each 1 149.00 1

b) Labour charges for crimping


Semi Skilled Electrician day 0.033 Err:509 1
Helper day 0.033 Err:509 1
Sundries such as bolts and nuts.
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 30 jobs /
day
BLD-ELEC-15-4

15.4.11 Supply and fixing of crimping type copper


lugs confirming to I.S specifications for cable
of 240 Sq.mm including nuts and bolts with
connections.
a) Material
ELEC-4.4.10 Copper Lugs up to 240 sqmm each 1 215.00 1

b) Labour charges for crimping


Semi Skilled Electrician day 0.04 Err:509 1
Helper day 0.04 Err:509 1
Sundries such as bolts and nuts.
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 25 jobs /
day
BLD-ELEC-15-4

15.4.12 Supply and fixing of crimping type copper


lugs confirming to I.S specifications for cable
of 300 Sq.mm including nuts and bolts with
connections.
a) Material
ELEC-4.4.12 Copper Lugs up to 300 sqmm each 1 284.00 1

b) Labour charges for crimping


Semi Skilled Electrician day 0.05 Err:509 1
Helper day 0.05 Err:509 1
Sundries such as bolts and nuts.
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 20 jobs /
day
BLD-ELEC-15-4

15.4.13 Supply and fixing of crimping type copper


lugs confirming to I.S specifications for cable
of 400 Sq.mm including nuts and bolts with
connections.
a) Material
ELEC-4.4.12 Copper Lugs up to 400 sqmm each 1 418.00 1

b) Labour charges for crimping


Semi Skilled Electrician day 0.062 Err:509 1
Helper day 0.062 Err:509 1
Sundries such as bolts and nuts.
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 16 jobs /
day
BLD-ELEC-15-4

15.4.14 Supply and fixing of crimping type Aluminium


lugs confirming to I.S specifications for
cables upto 16 Sq.mm including nuts and
bolts with connections.
a) Material
ELEC-4.4.13 Aluminium Lugs up to 16 sqmm each 1 12.00 1

b) Labour charges for crimping


Semi Skilled Electrician day 0.01 Err:509 1
Helper day 0.01 Err:509 1
Sundries such as bolts and nuts.
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 100
jobs / day
BLD-ELEC-15-4

15.4.15 Supply and fixing of crimping type Aluminium


lugs confirming to I.S specifications for cable
of 25 Sq.mm including nuts and bolts with
connections.
a) Material
ELEC-4.4.14 Aluminium Lugs up to 25 sqmm each 1 14.00 1

b) Labour charges for crimping


Semi Skilled Electrician day 0.01 Err:509 1
Helper day 0.01 Err:509 1
Sundries such as bolts and nuts.
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 100
jobs / day
BLD-ELEC-15-4

15.4.16 Supply and fixing of crimping type Aluminium


lugs confirming to I.S specifications for cable
of 35 Sq.mm including nuts and bolts with
connections.
a) Material
ELEC-4.4.15 Aluminium Lugs up to 35 sqmm each 1 17.00 1

b) Labour charges for crimping


Semi Skilled Electrician day 0.013 Err:509 1
Helper day 0.013 Err:509 1
Sundries such as bolts and nuts.
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 75 jobs /
day
BLD-ELEC-15-4

15.4.17 Supply and fixing of crimping type Aluminium


lugs confirming to I.S specifications for cable
of 50 Sq.mm including nuts and bolts with
connections.
a) Material
ELEC-4.4.16 Aluminium Lugs up to 50 sqmm each 1 20.00 1

b) Labour charges for crimping


Semi Skilled Electrician day 0.013 Err:509 1
Helper day 0.013 Err:509 1
Sundries such as bolts and nuts.
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 75 jobs /
day
BLD-ELEC-15-4

15.4.18 Supply and fixing of crimping type aluminium


lugs confirming to I.S specifications for cable
of 70 Sq.mm including nuts and bolts with
connections.
a) Material
ELEC-4.4.17 Aluminium Lugs up to 70 sqmm each 1 25.00 1

b) Labour charges for crimping


Semi Skilled Electrician day 0.013 Err:509 1
Helper day 0.013 Err:509 1
Sundries such as bolts and nuts.
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 75 jobs /
day
BLD-ELEC-15-4

15.4.19 Supply and fixing of crimping type aluminium


lugs confirming to I.S specifications for cable
of 95 Sq.mm including nuts and bolts with
connections.
a) Material
ELEC-4.418 Aluminium Lugs up to 95 sqmm each 1 27.00 1

b) Labour charges for crimping


Semi Skilled Electrician day 0.016 Err:509 1
Helper day 0.016 Err:509 1
Sundries such as bolts and nuts.
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 60 jobs /
day
BLD-ELEC-15-4

15.4.20 Supply and fixing of crimping type aluminium


lugs confirming to I.S specifications for cable
of 120 Sq.mm including nuts and bolts with
connections.
a) Material
ELEC-4.4.19 Aluminium Lugs up to 120 sqmm each 1 35.00 1

b) Labour charges for crimping


Semi Skilled Electrician day 0.02 Err:509 1
Helper day 0.02 Err:509 1
Sundries such as bolts and nuts.
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 50 jobs /
day
BLD-ELEC-15-4

15.4.21 Supply and fixing of crimping type aluminium


lugs confirming to I.S specifications for cable
of 150 Sq.mm including nuts and bolts with
connections.
a) Material
ELEC-4.4.20 Aluminium Lugs up to 150 sqmm each 1 40.00 1

b) Labour charges for crimping


Semi Skilled Electrician day 0.04 Err:509 1
Helper day 0.04 Err:509 1
Sundries such as bolts and nuts.
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 25 jobs /
day
BLD-ELEC-15-4

15.4.22 Supply and fixing of crimping type aluminium


lugs confirming to I.S specifications for cable
of 185 Sq.mm including nuts and bolts with
connections.
a) Material
ELEC-4.4.21 Aluminium Lugs up to 185 sqmm each 1 46.00 1

b) Labour charges for crimping


Semi Skilled Electrician day 0.04 Err:509 1
Helper day 0.04 Err:509 1
Sundries such as bolts and nuts.
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 25 jobs /
day
BLD-ELEC-15-4

15.4.24 Supply and fixing of crimping type aluminium


lugs confirming to I.S specifications for cable
of 240 Sq.mm including nuts and bolts with
connections.
a) Material
ELEC-4.4.22 Aluminium Lugs up to 240 sqmm each 1 71.00 1

b) Labour charges for crimping


Semi Skilled Electrician day 0.04 Err:509 1
Helper day 0.04 Err:509 1
Sundries such as bolts and nuts.
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 25 jobs /
day
BLD-ELEC-15-4

15.4.25 Supply and fixing of crimping type aluminium


lugs confirming to I.S specifications for cable
of 300 Sq.mm including nuts and bolts with
connections.
a) Material
ELEC-4.4.23 Aluminium Lugs up to 300 sqmm each 1 92.00 1

b) Labour charges for crimping


Semi Skilled Electrician day 0.05 Err:509 1
Helper day 0.05 Err:509 1
Sundries such as bolts and nuts.
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 20 jobs /
day
BLD-ELEC-15-4

15.4.26 Supply and fixing of crimping type aluminium


lugs confirming to I.S specifications for cable
of 400 Sq.mm including nuts and bolts with
connections.
a) Material
ELEC-4.4.24 Aluminium Lugs up to 400 sqmm each 1 119.00 1

b) Labour charges for crimping


Semi Skilled Electrician day 0.062 Err:509 1
Helper day 0.062 Err:509 1
Sundries such as bolts and nuts.
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 16 jobs /
day
15.5 CABLE JOINTS
15.5.1 Providing and erecting epoxy staight through
joint out door / indoor for L.T, PVC
BLD-ELEC-15-5

Armoured cable 1100V grade complete with


ferrule, bushings, accessories and suitable
clamps duly erected and connected to the
supply for the following multi core cables
including cost and conveyance of materials
and all labour charges etc., complete.

(a) 2.5 Sq.mm to 16 Sq.mm


a) Material
ELEC-4.5.1 Epoxy straight joint 2.5 to 16 Sq.mm with each 1 1300.00 1
accessories
b) Labour charges
Skilled Electrician day 0.5 Err:509 1
Helper day 0.5 Err:509 1
Sundries
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
BLD-ELEC-15-5

day
(b) 25 Sq.mm to 50 Sq.mm
a) Material
ELEC-4.5.2 Epoxy straight joint 25 to 50 Sq.mm with each 1 1545.00 1
accessories
b) Labour charges
Semi Skilled Electrician day 0.5 Err:509 1
Helper day 0.5 Err:509 1
Sundries
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
BLD-ELEC-15-5 day
(c ) 70 Sq.mm to 95 Sq.mm
a) Material
ELEC-4.4.18 Epoxy straight joint 70 to 95 Sq.mm with each 1 #REF! 1
accessories
b) Labour charges
Semi Skilled Electrician day 0.5 Err:509 1
Helper day 0.5 Err:509 1
Sundries
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs /
BLD-ELEC-15-5

day
(d) 75Sq.mm to 185 Sq.mm
a) Material
ELEC-4.4.18 Epoxy straight joint 120 to 185 Sq.mm with each 1 2230.00 1
accessories
b) Labour charges
Semi Skilled Electrician day 0.5 Err:509 1
Helper day 0.5 Err:509 1
Sundries
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is Considered for 2 jobs / day
BLD-ELEC-15-5

(e) 240 Sq.mm - 300 Sq mm


a) Material
ELEC-4.4.19 Epoxy straight joint 240 Sq.mm with accessories each 1 4000.00 1

b) Labour charges
Skilled Electrician day 1 Err:509 1
Helper day 1 Err:509 1
Sundries
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
BLD-ELEC-15-5

Rate per Each


(f) 300 Sq.mm
a) Material
ELEC-4.4.19 Epoxy straight joint 300 Sq.mm with each 1 #REF! 1
accessories
b) Labour charges
Skilled Electrician day 1 Err:509 1
Helper day 1 Err:509 1
Sundries
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
BLD-ELEC-15-5

Rate per Each


(g) 400 Sq.mm
a) Material
ELEC-4.5.5 Epoxy straight joint 400 Sq.mm with accessories each 1 5425.00 1

b) Labour charges
Skilled Electrician day 1 Err:509 1
Helper day 1 Err:509 1
Sundries
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Bldngs_Elec-15-4
15.6 Labour Charges Laying of Cable including cost of all Materials other than Cable

15.6.1 Earth work excavation of Trench in hard ground soil, laying of U.G cables upto 50 Sq,mm on sand cushio
BLD-ELEC-15-5

a) Material
ELEC-9.1.50 Excavation of earth 100 x 0.3 X 0.9 m cum 27 220.00 1

ELEC-9.1.52 Cost of bricks (Civil SSR) 1000 0.92 3819.00 1000


Nos
ELEC-9.1.51 Cost of sand (Civil SSR) cum 6 594.00 1

ELEC-9.1.48 Cement (Civil SSR) Kg 25 6.60 1

ELEC-9.1.23 Cost of cable route indicator each 12 90.00 1

Transportation charges of bricks and sand LS


b) Labour charges for laying cable.
Man Mazdoor for spreading the sand and each 2.5 510.00 1
back filling the excavated soil.
Skilled Electrician day 1 648.00 1
Helper day 2 540.00 1
Man Mazdoor for concreting and embedding of cable
day
way indicators
2 510.00 1

Sundires and Rounding off


Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per 100mts
Rate per 1 Rmt
Note : Labour Charges Considered for 100 Mts / day

15.6.2 Earth work excavation of Trench in hard ground soil, laying of U.G cables from 70 sqmm to 400 Sq,mm o
BLD-ELEC-15-5

a) Material
ELEC-8.1.56 Excavation of earth 100 x 0.3 X 0.9 m cum 27 220.00 1
ELEC-8.1.58 Cost of bricks (Civil SSR) 1000 0.92 3819.00 1000
Nos
ELEC-8.1.57 Cost of sand (Civil SSR) cum 6 594.00 1
ELEC-8.1.54 Cement (Civil SSR) Kg 25 6.60 1
ELEC-8.1.30 Cost of cable route indicator each 12 90.00 1
Transportation charges of bricks and sand LS
b) Labour charges for laying cable.
Man Mazdoor for spreading the sand and each 2.5 510.00 1
back filling the excavated soil.
Skilled Electrician day 1.6 648.00 1
Helper day 3.3 540.00 1
Man Mazdoor for concreting and embedding day 2 510.00 1
of cable way indicators
Sundires and Rounding off
Sub total
add for over heads @ 13.62%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per 60mts
Rate per 1 Rmt
Note :1. Labour Charges Considered for 60 Mts / day
2. Cables shall be at a depth of not less than 600 mm in a trench. Sand filling shall be provi
bottom of trench
3. Only the cost ofbefore
cableslaying
may bethe cable.
added forBricks shall
finished be provided on either side of the laid ca
item.
15.6.3 Labour charges for run of U.G cable on
wall / existing pipe with necessary fixing
BLD-ELEC-15-5

arrangments such as saddles,


clamps,wooden separators etc., (as directed
by departmental official) with No.10 SWG G.I
wire for eath connections for the cables.

a) Material
Wooden separators each 200 1
saddles of required size 100 nos 2 1
12mm screws 100 nos 4 1
ELEC-8.1.41 No.10 SWG GI wire kg 7 #REF! 1
b) Labour charges
Skilled Electrician day 1 Err:509 1
Helper day 4 Err:509 1
Sundires such as Cement, Sand etc.,
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour Charges Considered for
100 Mts / day
15.6.4 Supply and laying of one number double
walled corrugated (DWC) HDPE pipe of
following sizes having corrugation on the
outer wall and plain surface inner wall
BLD-ELEC-15-5

confirming to IS : 14930 Part - I and II


complete with necessary HDPE fittings for
protection of 1.1 KV grade U.G cable directly
in ground at a depth of 60Cms including
excavation and refilling the trench as
required.

a) 50mm outer dia nominal size


b) 78mm outer dia nominal size
c) 90mm outer dia nominal size
d) 120mm outer dia nominal size
a) Material
Double wall corrugated HDPE pipe confirming to IS RM
: 14930. 6

Snap-fit coupler each 1


Excavation of earth work & Refilling for a size of 1.0x0.3x0.6Mtr.
cum 0.18

Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Metre
Bldngs_Elec-16
16 TEMPORARY ILLUMINATION
BLD-ELEC-16.1

data shown seperately at the end.


17 GENERATORS AND TRANSFORMERS
Supply, Transportation, erection and commissioning of following specifications of D.G. Set consists of E
A alternator
Alternator which are directly
: KIRLOSKAR coupled by/ means
/ STAMFORD CROMPTONof flexible cooping
on D.G.S & Dwith guard make.
approved and mounted on a com
The alternator of
B rating shall
Diesel Enginebe :1 KIRLOSKAR
Ph / 3 Ph, 240V / 415V, 50
/ GREAVES Hz., A.C., 0.8
/ CUMMINS P.f lagging
/ ASHOK LEY at 1500orRPM.
LAND DGS&DThe approved.
alternator is
Dies
C start, developing
Control suitable
Panel : Control BHPshall
Panel output
be at 1500 RPM
fabricated withwith class A2
16 SWG Governing
CRCA so asThe
sheet steel. to enable
control the altern
panel sha
enclosed,
1. Voltmeterdust
withand vermin
selector proof, floor mounted2. /Ammeter
switch wall mounted type and
with Selector shall be comprising th
Switch
3. MCCB / MCB incomer of suitable rating 4. P.F. Meter and frequency Meter
5. Indication Lamp Set 6. KWH Meter of required rating
7. Instrument and control fuses.
ACOUSTIC ENCLOSURE
Supply & providing & installation of acoustic enclosure (sound proof enclosure cum container) for the abo
with the following
Construction specification.
: The panel of acoustic enclosure shall consists of self supporting frame work put togethe
17.1 of fasteners,
Generating Setswhich is for assembling and dismantling. The vertical and Horizontal structure 8is to be fab
BLD-ELEC-16.1

17.1.3 (a) Supply, Transportation, erection of 3 Ph Air-


Cooled 20KVA, D.G.Set with alternator,
Diesel Engine, Control panel etc., as per
specifications mentioned above.

a) Material
20KVA Air Cooled, 3Ph, 451V, 50Hz., D.G.Set. each 1 0

Erection and commissioning charges @ 10%


10% of the cost of the set.
Transportation at 2% on unit cost 2%
Sundires and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
17.1.3 (b) Supply, Transportation, erection of 3 Ph Air-
BLD-ELEC-16.1

Cooled 20KVA, D.G.Set with alternator,


Diesel Engine, Control panel etc., with
acoustic enclosure as per specifications
mentioned above.
a) Material
20KVA Air Cooled, 3Ph, 451V, 50Hz., each 1
D.G.Set
cost of acoustic enclosure each 1
Erection and commissioning charges :
the 10%
cost of the DG set.
cost 5%
of acoustic enclosure
Transportation at 2% on unit cost 2%
Sundires and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
17.1.3 (c) Supply, Transportation, erection of 3 Ph Air-
BLD-ELEC-16.1

Cooled 25KVA, D.G.Set with alternator,


Diesel Engine, Control panel etc., as per
specifications mentioned above.

a) Material
3Ph, 415V, 50Hz., 25 KVA Air Cooled each 1
D.G.Set
Erection and commissioning charges @ 10%
10% of the cost of the set.
Transportation at 2% on unit cost 2%
Sundires and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
17.1.3 (d) Supply, Transportation , erection of 3 Ph Air-
BLD-ELEC-16.1

Cooled 25KVA, D.G.Set with alternator,


Diesel Engine, Control panel etc., with
acoustic enclosure as per specifications
mentioned above.
a) Material
3Ph, 415V, 50Hz., 25 KVA Air Cooled each 1
D.G.Set
Cost of Acoustic enclosure each 1
Erection and commissioning charges :
the cost of the DG set. 10%
cost of acoustic enclosure 5%
Transportation at 2% on unit cost 2%
Sundires and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
17.1.3 (e) Supply, Transportation, erection of 3 Ph Air-Cooled 40KVA, D.G.Set with alternator, Diesel Engine, Contr
BLD-ELEC-16.1

a) Material
ELEC-11.1.1c 40KVA, 3Ph,415V,D.G.Set each 1 617400.00 1
Erection and commissioning charges @ 10%
10% of the cost of the set.
Transportation at 2% on unit cost 2%
Sundires and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
17.1.3 (f) Supply, Transportation, erection of 3 Ph Air-
BLD-ELEC-16.1

Cooled 40KVA, D.G.Set with alternator,


Diesel Engine, Control panel etc., with
acoustic enclosure as per specifications
mentioned above.
a) Material
ELEC-10.1.3 40KVA, 3Ph,415V,D.G.Set each 1 617400.00 1
Cost of Acoustic enclosure each 1
Erection and commissioning charges :
the cost of the DG set. 10%
cost of acoustic enclosure 5%
Transportation at 2% 2%
Sundires and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
17.1.3 (g) Supply, Transportation , erection of 3 Phase
BLD-ELEC-16.1

Water cooled / Air Cooled 63KVA, D.G.Set


with alternator, Diesel Engine, Control panel
etc., as per specifications mentioned above.

a) Material
ELEC-11.1.2a 63KVA, 3Ph, 415V, D.G Set each 1 810000.00 1
Erection and commissioning charges @ 10% of the cost of the
10%
set.

Transportation at 2% 2%
Sundires and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
17.1.3 (h) Supply, Transportation , erection of 3 Phase
BLD-ELEC-16.1

Water Cooled / Air-Cooled 63KVA, D.G.Set


with alternator, Diesel Engine, Control panel
etc., with acoustic enclosure as per
specifications mentioned above.

a) Material
ELEC-10.1.4 63KVA, 3Ph, 415V, D.G Set each 1 #REF! 1
Cost of Acoustic enclosure each 1
Erection and commissioning charges :
the cost of the DG set. 10%
cost of acoustic enclosure 5%
Transportation at 2% 2%
Sundires and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
17.1.3 (i) Supply, Transportation , erection of 3 Phase
BLD-ELEC-16.1

Water cooled 125 KVA, D.G.Set with


alternator, Diesel Engine, Control panel etc.,
as per specifications mentioned above.

a) Material
ELEC-11.1.2b 125KVA, Water Cooled, 3Ph, 415V D.G.Set. each 1 1100000.00 1

Erection and commissioning charges @ 10%


10% of the cost of the set.
Transportation at 2% 2%
Sundires and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
17.1.3 (j) Supply, Transportation, erection of 3 Phase
BLD-ELEC-16.1

Water-Cooled 125KVA, D.G.Set with


alternator, Diesel Engine, Control panel etc.,
with acoustic enclosure as per specifications
mentioned above.
a) Material
ELEC-10.1.5 125KVA, Water Cooled, 3Ph, 415V D.G.Set. each 1 #REF! 1

Cost of Acoustic enclosure each 1


Erection and commissioning charges :
the cost of the DG set. 10%
cost of acoustic enclosure 5%
Transportation at 2% 2%
Sundires and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Bldngs_Elec-17-2
17.2 Transformers
17.2.1 Supply, transportation, erection and
commissioning of following specifications of
3 Phase, 50 Hz., Oil immersed and naturally
cooled, out door / Indoor type copper wound
transformer connected delta on H.V. side
and star on L.V side with additional neutral
brought out on load side, rating 11000 / 433
BLD-ELEC-16.2

volts with HV tapping + 2.5% cotinuously


rated for full load and temparature rise not
exceeding 450 C by thermometer in oil and
500 C by the resistance of the winding after
continuous run on full load rating complete
with the following standard mounting.

(a) 63 KVA, 3Ph, aluminium wound


Tansformer, CSP type (Core Self
Protection)
a) Material
63KVA Aluminium wound CSP type each 1
Transformer

Transportation including loading and 2%


unloading
(b) Labour charges for erection and 10%
commissioning.
BLD-ELEC-16.2

Rate per Each


(b) 100 KVA, 3Ph, aluminium wound
Tansformer, CSP type
a) Material
100 KVA Aluminium wound CSP type each 1
Transformer

Transportation including loading and 2%


unloading
(b) Labour charges for erection and 10%
commissioning.
BLD-ELEC-16.2

Rate per Each


(c ) 100 KVA, 3Ph, copper wound
Tansformer
a) Material
ELEC-7.14.2a 100 KVA Copper wound Transformer each 1 400000.00 1
Transportation including loading and 2%
unloading
(b) Labour charges for erection and 10%
commissioning.
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
BLD-ELEC-16.2

(d ) 160 KVA, 3Ph, copper wound


Tansformer
a) Material
160 KVA Copper wound Transformer each 1

Transportation including loading and 2%


unloading
(b) Labour charges for erection and 10%
commissioning.
BLD-ELEC-16.2

Rate per Each


(e) 200 KVA, 3Ph, copper wound
Tansformer
a) Material
200 KVA Copper wound Transformer each 1

Transportation including loading and 2%


unloading
(b) Labour charges for erection and 10%
commissioning.
BLD-ELEC-16.2

Rate per Each


(f) 250 KVA, 3Ph, copper wound
Tansformer
a) Material
ELEC-7.14.2b 250 KVA Copper wound Transformer each 1 645000.00 1

Transportation including loading and 2%


unloading
(b) Labour charges for erection and 10%
commissioning.
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
BLD-ELEC-16.2

(g) 315 KVA, 3Ph, copper wound


Tansformer
a) Material
ELEC-7.14.2c 315 KVA Copper wound Transformer each 1 735000.00 1

Transportation including loading and 2%


unloading
(b) Labour charges for erection and 10%
commissioning.
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
BLD-ELEC-16.2

(h) 500 KVA, 3Ph, copper wound


Tansformer
a) Material
ELEC-7.14.2d 500 KVA Copper wound Transformer each 1 910000.00 1

Transportation including loading and 2%


unloading
(b) Labour charges for erection and 10%
commissioning.
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
BLD-ELEC-16.2

(i) 630 KVA, 3Ph, copper wound


Tansformer
a) Material
630 KVA Copper wound Transformer each 1

Transportation including loading and 2%


unloading
(b) Labour charges for erection and 10%
commissioning.
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
BLD-ELEC-16.2

Rate per Each


(j) 1000 KVA, 3Ph, copper wound
Tansformer
a) Material
1000 KVA Copper wound Transformer each 1

Transportation including loading and 2%


unloading
(b) Labour charges for erection and 10%
commissioning.
Rate per Each
Bldngs_Elec-17-3
17.3 CIRCUIT BREAKER
17.3.7 Supply and errecting Air circuit Breaker
(ACB) manually operated non drawout type
with 6 way secondary isolating contacts
necessary micro switches for over load and
BLD-ELEC-16.3

short circuit indicator, door interlocking,


shunt release, under voltage release as well
as 10%-20% earth fault release suitable for
operational voltage 415V, 630A, erected in
position on provided panel boards in an
approved manner with necessary material
complete

a) Material
630A, 415V Fixed type 3 pole ACB each 1
Shunt release each 1
U/V release each 1
Earth fault release each 1
Transportation @ 2% on Unit Cost 2%
b) Labour charges for installation @ 5% 5%

Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
17.3.8 Supply and errecting Air circuit Breaker
(ACB) manually operated non drawout type
with 6 way secondary isolating contacts
necessary micro switches for over load and
short circuit indicator, door interlocking,
BLD-ELEC-16.3

shunt release, under voltage release as well


as 10%-20% earth fault release suitable for
operational voltage 415V, 800A, erected in
position on provided panel boards in an
approved manner with necessary material
complete.

a) Material
800A, 415V Fixed type 3 pole ACB each 1
Shunt release Coil. each 1
U/V release Coil. each 1
Earth fault release each 1
Transportation @ 2% on Unit Cost 2%
b) Labour charges for installation @ 5% 5%

Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
17.3.9 Supply and errecting Air circuit Breaker
(ACB) manually operated non drawout type
with 6 way secondary isolating contacts
necessary micro switches for over load and
short circuit indicator, door interlocking,
BLD-ELEC-16.3

shunt release, under voltage release as well


as 10%-20% earth fault release suitable for
operational voltage 415V, 1000A, erected in
position on provided panel boards in an
approved manner with necessary material
complete.

a) Material
1000A, 415V, Fixed type 3 pole ACB. each 1
Shunt release each 1
U/V release each 1
Earth fault release each 1
Transportation @ 2% on Unit Cost 2%
b) Labour charges for installation @ 5% 5%

Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Bldngs_Elec-17-4
17.4 SUB - STATION EQUIPMENT
BLD-ELEC-16.4

17.4.1 Supply and fixing printed instructions chart


both in English and Telugu and duly framed
with front glass for treatment of person
suffering from Electric shock.
a) Material
Printed insturction chart both of size 0.9 x each 1
0.6 M in English and Telugu.
Towards making wooden frame with front 150%
glass including cost of material and labour
on unti cost of Item 1.
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
BLD-ELEC-16.4

Rate per Each


17.4.2 Supply of pair of rubber hand gloves suitable
for working 11/22 KV supply.
a) Material
ELEC-9.1.31 Rubber hand gloves suitable for working on each 1 200.00 1
11/22 KV supply
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each Pair
BLD-ELEC-16.4
17.4.3 Supply of 11KV, ISI, approved rubber mat of
thickness, required length and breadth.
a) Material
6mm thick, ISI make Rubber mat suitable for each 1
working on 11/22 KV
Sundries and rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
BLD-ELEC-16.4

Rate per sqmt


17.4.4 Supply of standard 18"x12"x8" first aid box
with all standard contents.
a) Material
ELEC-9.1.30 18" x 12" x 8" size First Aid box. each 1 1100.00 1

Set of Cotton, band aid cloth Antiseptic cream etc., set 1

Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
BLD-ELEC-16.4

17.4.5 Supply of G.I sheet bucket of round bottom


of 13 Ltrs. Capacity with printed letters and
filled with sand and arranged to existing
stand or hook.
a) Material
13 Ltrs. Capacity G.I. bucket. each 1
Painting with 2 coats of red color enamell paint on out
sqmside. 0.5

Cost of sand cum 0.13


Sundires for printing letter etc.,
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
17.4.6 Supply of Tranformer oil tested and having
BLD-ELEC-16.4

good resistance to high electric stress di-


electric strength 50KV, low viscocity, low
pour point, high flash point and excellent
thermal properties for efficient heat transfer
and cooling as per IS 335-1972.

a) Material
ELEC-7.13.4 Transformer Oil having Dielectric strength of L 1 500.00 1
50 KV
Sundries and rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Lt
17.4.7 Providing floor mounting stand for keeping
BLD-ELEC-16.4

4Nos of bucket 1500mm length, 900mm


height made out of 40x40x6mm angle iron
welded with 4 hooks and duly painted with
one coat of red lead and two coats of
enamel paint.

a) Material
1500mm length, 900mm height Floor kg 17.5
mounting stand fabricated with 40x40x6mm
angle iron welded with 4 Nos Hooks. (1Mtr =
3.5Kg) (5x3.5Kgs = 17.5Kgs)

Fabrication cost of hooks including painting 50%


(on cost of material)
Sundries and rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
17.4.8 Supply and erecting ABC Powder (stored
BLD-ELEC-16.4

pressure type) fire extinguisher 5kg


conforming to IS 2171-85 with necessary
clamps made from 50x6mm MS flat with
nuts & bolts grouted in wall complete.
a) Material
ABC Powder Stored pressure type fire each 1
extengensher of 5 Kg capacity .
50 x6mm M.S Apl. Clamps with bolt & nut. each 1

(b) Labour charges for erection.


Helper day 0.2 1
Sundires and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is considered for 5 jobs /
day
17.4.9 Supply and erecting ABC Powder (stored
BLD-ELEC-16.4

pressure type) fire extinguisher 10kg


conforming to IS 2171-85 with necessary
clamps made from 50x6mm MS flat with
nuts & bolts grouted in wall complete.
a) Material
ABC Powder Stored pressure type fire each 1
extengensher of 10 Kg capacity .
50 x6mm M.S Apl. Clamps with bolt & nut. each 1

(b) Labour charges for erection.


Helper day 0.2 1
Sundires and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is considered for 5 jobs /
day
17.4.10 Supply and erecting fencing of section
having size 2450 mm in height from ground
level and 1200mm width by using angle iron
size 50x50x6mm erected in CC foundation
15x15x40cms deep. The section of the
BLD-ELEC-16.4

frame shall be fitted with flat iron supports of


size 25x6mm on top, bottom and middle and
chain link jali of 8 SWG G.I to the angle
iron at every distance of 30 cms by iron
studs complete duly painted with one coat of
red oxide and two coats of aluminium paint.

a) Material
50x50x6mm Angle Iron (1 Mt. = 4.37 Kg) 4.8 kg 20.97
m Length
25x6mm M.S Flat (1 Mt. 1.18 Kg) 3.6 M kg 4.25
length
Chain link Mesh (Civil SSR) sqm 2.4
Fabrication of Frame with angles, Flat and kg 25.22
chain link mesh
C.C.Work M 15 using 20 mm metal (15 x 15 cum 0.018
x 40) x 2 As per Civil SSR
Painting with one coat of red oxide and two sqm 5.88
coat of alluminium paint.
Sundires and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
17.4.11 Supply and erecting 50x50x6mm angle iron
as corner support to be fixed away from the
BLD-ELEC-16.4

fence support fixed at the middle of the


fencing frame and the other side in CC
foundation of 15x15x40 cms complete duly
painted with one coat of red oxide and two
coats of aluminium paint.

a) Material
50x50x6mm Angle. (1 mt. 4.37 Kg) 2m kg 8.74
Length
C.C.Work M 15 using 20 mm metal (15 x 15 cum 0.018
x 40) x 2 As per Civil SSR
Painting with one coat of red oxide and two 10%
coats of Aluminium paint (on cost of Item 1)

Sundires and Rounding off


Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
17.4.12 Supply and erecting double leaf hinged door
each 150cms width x 185cms height using
38.1 mm dia B grade ISI marked G.I pipe
from all four sides with necessary bends with
cross supports of angle iron 40 x 40 x 6mm
with the door leaf covered with chain link
mesh of No. 8 SWG G.I wire with necessary
flat iron covering all around frame. The door
BLD-ELEC-16.4

shall have heavy latches, and side channels


of 100x50x5mm locking arrangement with
lock of medium size with duplicate keys, the
fencing completely erected with anti
corrosive red oxide paint and two coats of
prescribed enamel paint / silver paint. The
channel iron of size 100x50mm x 2.5Mtr.
length shall be provided and erected at both
sides of gate with C.C work

a) Material
38.1mm dia B Class G.I pipe. RM 14
(1.85 x 4 Nos + 1.5x 4Nos = 13.4 Mt or say
14 Mtrs.) ( civil SSR)
25x6mm M.S. Flat (1.18 Kgs / Mt) 17 M kg 20.06
length
1000x50mm Channle (1mt = 8.74 Kg) 5 M kg 43.7
length
4 Nos x 2.38M Length, 40 x 40 x 6 mm M.S. kg 33.32
Angle Iron ( 1 Mtr = 3.5 Kg) 9.52 M length

Steel Aldrop with bolts and Nuts. each 1


Chain link mesh of 8 SWg G.I (Civil SSR) sqm 5.55
Medium size lock and Key each 1
Fabrication charges including welding etc., kg 118
complete.
Painting Charges sqm
b) Labour charges for erection including 5%
cost of hinges on items 1-6.
Sundireis and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Bldngs_Elec-17-5
17.5 SUB-STATION MAINTENANCE
17.5.1 (a) Filteration of transformer oil as per ISS for
removal of moisture, carbon slurry etc. by
BLD-ELEC-16.5

means of circulating oil through vaccum


pump from heating elements and filters to
withstand the dielectric strength of the oil
above 40KV beyond one minute tested in oil
testing Kit.

On site.
a) Material
Labour charges for filterations at site
Rate per Each
17.5.1 (b) Filteration of transformer oil as per ISS for
removal of moisture, carbon slurry etc. by
means of circulating oil through vaccum
pump from heating elements and filters to
withstand the dielectric strength of the oil
above 40KV beyond one minute tested in oil
testing Kit.

At Factory.
a) Material
Labour charges for filterations at site
Rate per Each
17.5.3 Carryout routine maintenance, servicing
and testing of 630A to 1000A L.T.ACB by
BLD-ELEC-16.5

cleaning fixed contacts, moving contacts


and arcchutes including servicing and
putting the ACB in perfect working condition
after detting all relay and ON, OFF
mechanism etc.

a) Material
ELEC-6.4.1 Removing the existing ACB and servicing #REF!
and testing of 630A to 1000A L.T.ACB.
Clearing of fixed contacts, moving contacts
and arcchutes
Refix the ACB inposition and testing and
commissioning charges.
b) Labour charges for entire job
Skilled Electrician day 3 #REF! 1
Semi Skilled Electrician day 3 #REF! 1
Helper day 6 #REF! 1
Sundries and Rounding
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note :Job requires 3 days. Keeping this labour
17.5.4 arrived.
Carryout routine maintenance and servicing
of LT.Cubical panel board having
approximately 15 to 22 Nos of switches by
cleaning with power blower and servicing the
BLD-ELEC-16.5

contacts, tightning the connection of


incoming and outgoing cables, and clicking
the operating mechanism for smooth
functioning of switches and putting them in
smooth working condition.

a) Material
ELEC-6.4.2 Removing all the doors of switches, busbar #REF! 1
chamber and back doors.
Clearing by using power blower.
Tightening all the terminations and cleaning
and servicing the contacts of switches.

b) Labour charges for entire job


Skilled Electrician day 2 #REF! 1
Semi Skilled Electrician day 1 #REF! 1
Helper day 2 #REF! 1
Sundries and Rounding
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note :Job requires 3 days. Keeping this labour
Bldngs_Elec-17-6
17.6 arrived.
PROTECTIVE GEAR
17.6.1 Supply and erecting approved make 11KV,
BLD-ELEC-16.6

5KA metal oxide lightning arrestors suitable


for 11 KV supply with necessary materials
on existing cross arm.

a) Material
ELEC-7.15.1 Cost of 11 KV 5KA metal oxide lighting each 1 1500.00 1
arrester.
b) Labour charges for erection.
Skilled Electrician day 0.33 648.00 1
Helper day 0.33 540.00 1
Sundries
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is considered for 3 jobs / day
BLD-ELEC-16.6

17.6.3 Supply and erecting porcelain disc type


insulator suitable for 11KV line with suitable
hardware on existing cross arms.
a) Material
ELEC-7.15.2 Cost of porcelain disc type insulator suitable each 1 600.00 1
for 11 KV
b) Labour charges for erection.
Skilled Electrician day 0.125 648.00 1
Helper day 0.25 540.00 1
Sundries
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is considered for 8 jobs / day
BLD-ELEC-16.6

17.6.5 Supply and erecting porcelain pin type


insulator suitable for 11KV line with suitable
hardware on existing cross arms.
a) Material
ELEC-7.15.3 Cost of porcelain pin type insulator suitable each 1 300.00 1
for 11 KV
b) Labour charges for erection.
Skilled Electrician day 0.125 648.00 1
Helper day 0.25 540.00 1
Sundries
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is considered for 8 jobs / day
BLD-ELEC-16.6

17.6.6 Supply and erecting porcelain post type


insulator suitable for 11KV line with suitable
hardware on existing cross arms.
a) Material
ELEC-7.15.4 Cost of porcelain post type insulator each 1 675.00 1
suitable for 11 KV
b) Labour charges for erection.
Skilled Electrician day 0.125 648.00 1
Helper day 0.25 540.00 1
Sundries
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour is considered for 8 jobs / day
17.6.8 Supply and fixing of lightning protective
system conforming to IS : 2309 with all
BLD-ELEC-16.6

standard accessories such as metal globe


finials on the top of the builiding with 25.4
mm dia 3.0 mtrs. Length of 'B' class G.I pipe
etc., complete without down conductors and
earthing

a) Material
Err:509 Lightning protective system with all standard each 1 Err:509 1
accessories such as metallic globe, finials
etc.,
25.4 mm B Class GI Pipe, ISI Mark M 3
b) Labour charges
i) for fixing the System on G.I pipe.
ii) for fixing on top of the building with C.C
work / Clamping arrangement.
Skilled Electrician day 1 648.00 1
Helper day 1 540.00 1
Sundries and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
17.6.10 Supply and erecting approved made 11KV,
BLD-ELEC-16.6 400A A.B switch with all standard
accessories etc., complelte with cost and
conveyance of all materials and labour
charges.
a) Material
ELEC-7.15.6 Cost of 11KV, 400A A.B switch wth all each 1 7000.00 1
standard accessories.
b) Labour charges for erection.
Skilled Electrician day 1 648.00 1
Semi Skilled Electrician day 1 540.00 1
Helper day 1 540.00 1
Sundries and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
17.6.11 Supply and erecting approved made 11KV,
BLD-ELEC-16.6

200A A.B switch with all standard


accessories etc., complelte with cost and
conveyance of all materials and labour
charges.
a) Material
ELEC-7.15.7 Cost of 11KV, 200A A.B switch wth all each 1 6100.00 1
standard accessories.
b) Labour charges for erection.
Skilled Electrician day 1 648.00 1
Semi Skilled Electrician day 1 540.00 1
Helper day 1 540.00 1
Sundries and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
17.6.12 Supply and erecting approved made 11KV,
BLD-ELEC-16.6

200A (Tilting) A.B switch with all standard


accessories etc., complelte with cost and
conveyance of all materials and labour
charges.
a) Material
ELEC-7.15.8 Cost of 11kV, 200A (Tilting) A.B switch wth each 1 5900.00 1
all standard accessories.
b) Labour charges for erection.
Skilled Electrician day 1 648.00 1
Semi Skilled Electrician day 1 540.00 1
Helper day 1 540.00 1
Sundries and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
17.6.13 Supply and erecting 11KV, H.G (Horn Gap)
BLD-ELEC-16.6

fuse set including all standard accessories


etc., complete with cost and conveyance of
all materials and labour charges.

a) Material
ELEC-7.15.9 Cost of 11KV, H.G. fuse set wth all standard each 1 4000.00 1
accessories.
b) Labour charges for erection.
Skilled Electrician day 1 648.00 1
Helper day 1 540.00 1
Sundries and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
17.6.14 Supply and erecting of bank of metalised
polypropylene condensors with the standard
capacities of 2,3,5,7,10,12.5 and 15 KVAR
BLD-ELEC-16.6

units for PF correction for operation on 3


phase 50 Cycles 400 / 440V (+10%) with
externally discharging resistances, earthig
terminals etc., complete.

a) Material
ELEC-7.13.33 Cost of MPP capacitor operation on 3 Ph. Kvar 1 350.00 1
415V.
b) Labour charges for erection.
Skilled Electrician day 0.04 648.00 1
Helper day 0.08 540.00 1
Sundries and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Kvar
Note : Labour considered for 25 jobs / day
17.6.15 Supply and erecting of bank of mixdielectric
condensors with the standard capacities of
2,3,5,7,10,12.5 and 15 KVAR units for PF
BLD-ELEC-16.6

correction for operation on 3 phase 50


cycles 400/440V (+10%) with externally
discharging resistances, earthing terminals
etc., complete.

a) Material
Cost of of mixed Dielectric capacitor Kvar 1
operation on 3 Ph. 415V.
b) Labour charges for erection.
Skilled Electrician day 0.04 648.00 1
Helper day 0.08 540.00 1
Sundries and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Kvar
Note : Labour considered for 25 jobs / day
Bldngs_Elec-18
18 Repairs to Motors and Rewinding
Datas of 11.6.1 to 11.6.4 are hold good and
be adopted.
18.1.1 Rewinding the motor of the table / pedestal /
BLD-ELEC-16.6

cabin fan of all types, and makes and


overhauling including minor repairs, testing
for the original speed and consumption with
guarantee for one year including
tansporation from site and back.

a) Material
ELEC-9.1.38 Copper enamelled winding wire of fine kg 0.3 701.00 1
quality.
Labour charges towards removing 50%
unserviceable winding wire and cleaning. (on
cost of winding wire)
Labour charges towards rewinding the coils 100%
complete with connections etc., complete.
(on cost of winding wire)
Sundries such as sleeves cotton tape, 40%
minolex paper, solution etc., with
transportion charges.
ELEC-9.1.47 Less cost towards old winding wire kg 0.3 165.00 1

Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
18.1.2 Rewinding the motor of the ceiling fan of
BLD-ELEC-17-1

1200mm / 1400mm of all types and makes


and over hauling including minor repairs and
testing for original speed and consumption

a) Material
ELEC-9.1.38 35 / 36 Copper enamelled winding wire of kg 0.2 701.00 1
fine quality.
Labour charges towards removing 50%
unserviceable winding wire and cleaning. (on
cost of winding wire)
Labour charges towards rewinding the coils 100%
complete with connections etc., complete.
(on cost of winding wire)
Sundries such as sleeves cotton tape, 40%
minolex paper, solution etc., with
transportion charges.
ELEC-8.1.44 Less cost towards old winding wire kg 0.2 165.00 1

Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
18.1.3 Rewinding the motor of the exhaust fan of
BLD-ELEC-17-1

light duty 225/300mm of 900/1400 RPM of


all types and makes and over hauling
including minor repairs and testing for
original speed and consumption
a) Material
ELEC-9.1.38 23 / 24 / 28 Copper enamelled winding wire kg 0.05 701.00 1
of fine quality.
Labour charges towards removing 50%
unserviceable winding wire and cleaning. (on
cost of winding wire)
Labour charges towards rewinding the coils 100%
complete with connections etc., complete.
(on cost of winding wire)
Sundries such as sleeves cotton tape, 40%
minolex paper, solution etc., with
transportion charges.
ELEC-8.1.44 Less cost towards old winding wire kg 0.05 165.00 1

Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
18.1.4 Rewinding the motor of the exhaust fan of
BLD-ELEC-17-1

heavy duty 375mm of 900/1400 RPM of all


types and makes and over hauling including
minor repairs and testing for original speed
and consumption
a) Material
ELEC-9.1.38 23 / 24 / 28 Copper enamelled winding wire kg 0.45 701.00 1
of fine quality.
Labour charges towards removing 50%
unserviceable winding wire and cleaning. (on
cost of winding wire)
Labour charges towards rewinding the coils 100%
complete with connections etc., complete.
(on cost of winding wire)
Sundries such as sleeves cotton tape, 40%
minolex paper, solution etc., with
transportion charges.
ELEC-8.1.44 Less cost towards old winding wire kg 0.45 165.00 1

Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
18.1.5 Rewinding of electric motor upto 1 HP single
BLD-ELEC-17-1 phase upto 1400 RPM of all types and
makes with copper wire, overhauling with
minor repairs, testing for the original speed
and no load consumption .
a) Material
ELEC-9.1.38 Suitable guage copper winding wire fine kg 2.7 701.00 1
quality
Labour charges towards removing of old 5%
unserviceable winding wire.(on cost of
winding wire)
Labour charges towards rewinding copper 12%
coils complete with connections.(on cost of
winding wire)
Sundries such as sleeves, cotton tape, 2%
minolex paper solution etc., with
transportation.
ELEC-8.1.44 Less cost towards old winding wire kg 2.7 165.00 1

Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
18.1.6 Rewinding of electric motor 2 HP single
BLD-ELEC-17-1

phase 1400 RPM of all types and makes


with copper wire, overhauling with minor
repairs, testing for the original speed and no
load consumption.
a) Material
ELEC-9.1.38 Suitable guage copper winding wire fine kg 3.2 701.00 1
quality
Labour charges towards removing of old 5%
unserviceable winding wire.(on cost of
winding wire)
Labour charges towards rewinding copper 12%
coils complete with connections.(on cost of
winding wire)
Sundries such as sleeves, cotton tape, 2%
minolex paper solution etc., with
transportation.
ELEC-8.1.44 Less cost towards old winding wire kg 3.2 165.00 1

Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
18.1.7 Rewinding of electric motor 3 HP three
BLD-ELEC-17-1

phase 1400 RPM of all types and makes


with copper wire, overhauling with minor
repairs, testing for the original speed and no
load consumption .
a) Material
ELEC-9.1.38 Suitable guage copper winding wire fine kg 4.5 701.00 1
quality
Labour charges towards removing of old 5%
unserviceable winding wire.(on cost of
winding wire)
Labour charges towards rewinding copper 12%
coils complete with connections.(on cost of
winding wire)
Sundries such as sleeves, cotton tape, 2%
minolex paper solution etc., with
transportation.
ELEC-8.1.44 Less cost towards old winding wire kg 4.5 165.00 1

Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
18.1.8 Rewinding of electric motor 5 HP three
BLD-ELEC-17-1

phase 1400 RPM of all types and makes


with copper wire, overhauling with minor
repairs, testing for the original speed and no
load consumption .
a) Material
ELEC-9.1.38 Suitable guage copper winding wire fine kg 5.7 701.00 1
quality
Labour charges towards removing of old 5%
unserviceable winding wire.(on cost of
winding wire)
Labour charges towards rewinding copper 12%
coils complete with connections.(on cost of
winding wire)
Sundries such as sleeves, cotton tape, 2%
minolex paper solution etc., with
transportation.
ELEC-8.1.44 Less cost towards old winding wire kg 5.7 165.00 1

Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
18.1.9 Rewinding of electric motor 7.5 HP three
BLD-ELEC-17-1

phase 1400 RPM of all types and makes


with copper wire, overhauling with minor
repairs, testing for the original speed and no
load consumption .
a) Material
ELEC-9.1.38 Suitable guage copper winding wire fine kg 6.5 701.00 1
quality
Labour charges towards removing of old 5%
unserviceable winding wire.(on cost of
winding wire)
Labour charges towards rewinding copper 12%
coils complete with connections.(on cost of
winding wire)
Sundries such as sleeves, cotton tape, 2%
minolex paper solution etc., with
transportation.
ELEC-8.1.44 Less cost towards old winding wire kg 6.5 165.00 1

Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
18.1.10 Rewinding of electric motor 10 HP three
BLD-ELEC-17-1

phase 1400 RPM of all types and makes


with copper wire, overhauling with minor
repairs, testing for the original speed and no
load consumption .
a) Material
ELEC-9.1.38 Suitable guage copper winding wire fine kg 10 701.00 1
quality
Labour charges towards removing of old 5%
unserviceable winding wire.(on cost of
winding wire)
Labour charges towards rewinding copper 12%
coils complete with connections.(on cost of
winding wire)
Sundries such as sleeves, cotton tape, 2%
minolex paper solution etc., with
transportation.
ELEC-8.1.44 Less cost towards old winding wire kg 10 165.00 1

Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
18.1.11 Rewinding of electric motor 12.50 HP three
BLD-ELEC-17-1

phase 1400 RPM of all types and makes


with copper wire, overhauling with minor
repairs, testing for the original speed and no
load consumption .
a) Material
ELEC-9.1.38 Suitable guage copper winding wire fine kg 12 701.00 1
quality
Labour charges towards removing of old 5%
unserviceable winding wire.(on cost of
winding wire)
Labour charges towards rewinding copper 12%
coils complete with connections.(on cost of
winding wire)
Sundries such as sleeves, cotton tape, 2%
minolex paper solution etc., with
transportation.
ELEC-8.1.44 Less cost towards old winding wire kg 12 165.00 1

Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
18.1.12 Rewinding of electric motor 15 HP three
BLD-ELEC-17-1

phase 1400 RPM of all types and makes


with copper wire, overhauling with minor
repairs, testing for the original speed and no
load consumption .
a) Material
ELEC-9.1.38 Suitable guage copper winding wire fine kg 15 701.00 1
quality
Labour charges towards removing of old 5%
unserviceable winding wire.(on cost of
winding wire)
Labour charges towards rewinding copper 12%
coils complete with connections.(on cost of
winding wire)
Sundries such as sleeves, cotton tape, 2%
minolex paper solution etc., with
transportation.
ELEC-8.1.44 Less cost towards old winding wire kg 15 165.00 1

Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
18.1.13 Rewinding of electric motor 20 HP three
BLD-ELEC-17-1

phase 1400 RPM of all types and makes


with copper wire, overhauling with minor
repairs, testing for the original speed and no
load consumption.
a) Material
ELEC-9.1.38 Suitable guage copper winding wire fine kg 18 701.00 1
quality
Labour charges towards removing of old 5%
unserviceable winding wire.(on cost of
winding wire)
Labour charges towards rewinding copper 12%
coils complete with connections.(on cost of
winding wire)
Sundries such as sleeves, cotton tape, 2%
minolex paper solution etc., with
transportation.
ELEC-8.1.44 Less cost towards old winding wire kg 18 165.00 1

Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
18.1.14 Rewinding of submersible motor upto 15 HP
BLD-ELEC-17-1

three phase of all types and makes with


copper wire, overhauling with minor repairs,
testing for the original speed and no load
consumption .
a) Material
ELEC-9.1.36 PVC insulated copper winding wire of kg 18 726.00 1
suitable guage.
Labour charges towards removing of old 10%
unserviceable winding wire.(on cost of
winding wire)
Labour charges towards rewinding copper 15%
coils complete with connections.(on cost of
winding wire)
Sundries such as sleeves, cotton tape, 5%
minolex paper solution etc., with
transportation.
ELEC-8.1.44 Less cost for winding wire kg 18 165.00 1

Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Bldngs_Elec-18-2
18.2 Bearings
BLD-ELEC-17-2

18.2.1 Replacing the existing bearing of approved


make for electric motor single phase / 3
phase AC upto 1 HP of all types with due
alignment of the shaft and tested.
a) Material
ELEC-5.11.1 Ball Bearings suitable for 1 HP Motor each 1 179.00 1
inclusive of taxes
Labour charges for removing the existing 50%
unserviceable bearing and fixing the new
ball bearing with special T&P. (on cost of Ball
Bearing)
Transportation and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
18.2.2 Replacing the existing bearing of approved
BLD-ELEC-17-2

make for electric motor single phase / 3


phase AC upto 2 to 3 HP of all types with
due alignment of the shaft and tested.

a) Material
ELEC-5.11.2 Ball Bearings suitable for 2 to 3 HP Motor each 1 231.00 1
inclusive of taxes
Labour charges for removing the existing 50%
unserviceable bearing and fixing the new
ball bearing with special T&P. (on cost of Ball
Bearing)
Transportation and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
18.2.3 Replacing the existing bearing of approved
BLD-ELEC-17-2

make for electric motor single phase / 3


phase AC upto 5 to 7.5 HP of all types with
due alignment of the shaft and tested.

a) Material
ELEC-5.11.3 Ball Bearings suitable for 5 to 7.5 HP Motor each 1 306.00 1
inclusive of taxes
Labour charges for removing the existing 50%
unserviceable bearing and fixing the new
ball bearing with special T&P. (on cost of Ball
Bearing)
Transportation and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
18.2.4 Replacing the existing bearing of approved
BLD-ELEC-17-2

make for electric motor single phase / 3


phase AC upto 10 to 12.5 HP of all types
with due alignment of the shaft and tested.

a) Material
ELEC-5.11.4 Ball Bearings suitable for 10 to 12.5 HP each 1 319.00 1
Motor inclusive of taxes
Labour charges for removing the existing 50%
unserviceable bearing and fixing the new
ball bearing with special T&P. (on cost of Ball
Bearing)
Transportation and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
18.2.5 Replacing the existing bearing of approved
BLD-ELEC-17-2

make for electric motor single phase / 3


phase AC upto 15 to 20 HP of all types with
due alignment of the shaft and tested.

a) Material
ELEC-5.11.5 Ball Bearings suitable for 15 to 20 HP Motor each 1 489.00 1
inclusive of taxes
Labour charges for removing the existing 50%
unserviceable bearing and fixing the new
ball bearing with special T&P. (on cost of Ball
Bearing)
Transportation and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
BLD-ELEC-17-2

18.2.6 Replacing the ball bearing of table / cabin /


pedestal / ceiling / exhaust fan complete with
alignment of shaft and tested.
a) Material
ELEC-5.11.6 Ball Bearings suitable for table / cabin / each 1 84.00 1
ceiling / Exhaust Fan inclusive of taxes
Labour charges for removing the existing 50%
unserviceable bearing and fixing the new
ball bearing with special T&P. (on cost of Ball
Bearing)
Transportation and Rounding off
Sub total
add for over heads @ 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
BLD-ELEC-17-2

18.2.7 Replacing the ball bearing of bush /


rubber / ring washers for fan mortar
complete with alignment of shaft and tested.

a) Material
ELEC-5.11.7 Cost of GM / Bush / Rubber / Ring washer each 1 40.00 1
etc.,
Labour charges for removing the existing 50%
unserviceable bush/ ring washer and fixing
the new with special T&P.(on cost of
material)
Rounding Off
Sub Total
Overheads & Contractors Profit 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
BLD-ELEC-17-2

18.2.8 Replacing the existing capacitor of table /


cabin / pedestal / ceiling / exhaust fan
complete with wiring.
a) Material
ELEC-5.11.8 Cost of 2.5 / 3.5 mfd condensor suitable for each 1 38.00 1
ceiling / pedastal Exhaust Fan
b) Labour charges for removing and
refixing
Semi Skilled Electrician day 0.1 540.00 1

Rounding Off
Sub Total
Overheads & Contractors Profit 14%
Sub Total
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per Each
Note : Labour considered for 10 jobs /
day
- Electrical Items For Buildings

Per Amount Rs.

SWG (ISI Mark) MS Surface conduit pipe duly threading at Joints with all
Separators with chromium plated base saddles and No.18 SWG MS box for
cluding cost of Cement, all materials, accessories and all labour charges etc.,

m 9900.00

Nos 330.00

Nos 178.00

Nos 56.00

Nos 236.00

Nos 422.00

Nos 324.00

Nos 280.80

No 219.00

Kg 57.50

day 1944.00
day 1620.00
day 1620.00
0.00
17187.30
2340.05
19527.35
0.00
0.00
19527.35
195.27

SWG (ISI MARK) MS Surface pipe duly threading at Joints with all required
s with chromium plated base saddles and No.18 SWG MS box for run of mains
s, accessories and all labour charges etc., complete.

m 12675.00

Nos 247.50
Nos 144.00

Nos 42.00
Nos 177.00
Nos 330.00

Nos 172.80

Nos 309.60

Kg 57.50

day 1944.00
day 1620.00
day 1620.00
0.00
19339.40
2633.06
21972.46
0.00
0.00
21972.46
219.72
SWG (ISI MARK) MS Surface pipe duly threading at Joints with all required
s with chromium plated base saddles and No.18 SWG MS box for run of mains
s, accessories and all labour charges etc., complete.

m 17850.00
Nos 247.50
Nos 144.00
Nos 42.00
Nos 177.00
Nos 366.00

Nos 13.00
Nos 58.00
Kg 57.50

day 1944.00
day 1620.00
day 1620.00
0.00
24139.00
3286.52
27425.52
0.00
0.00
27425.52
274.26

SWG (ISI Mark) MS concealed conduit, duly threadig at Joints, on wall with
ling the wall for light, Fan and separate plug point including necessary sheet
nd all labour charges etc. complete.

m 9900.00
Nos 88.00
Nos 213.00
Nos 280.80
Kg 57.50

day 1944.00
day 1620.00
day 1620.00
day 1692.00

17415.30
2371.09
19786.39
0.00
0.00
19786.39
197.86
WG (ISI MARK) MS concealed conduit, duly threadig at Joints in Slab and on
ding chiselling the wall and necessary Masonary and all labour charges etc.

m 12675.00

Nos 88.00
Nos 852.00
Nos 309.60
Kg 230.00

day 1944.00
day 1620.00
day 1620.00
day 1692.00
0
21030.60
2863.32
23893.92
0.00
0.00
23893.92
238.94

m 17850.00

Nos 88.00

Nos 1488.00

Nos 696.00

Kg 230.00

day 1944.00
day 1620.00
day 1620.00
day 1692.00

27228.00
3707.09
30935.09
0.00
0.00
30935.09
309.35

m 1910.00

Nos 56.00
Nos 192.00
Nos 422.00

Nos 204.00

Nos 48.00

Nos 552.00

Kg 115.00

day 1296.00
day 1080.00
day 1080.00
0
6955.00
946.92
7901.92
0.00
0.00
7901.92
79.02

m 2540.00

Nos 56.00
Nos 192.00
Nos 422.00
Nos 228.00

Nos 72.00

Kg 115.00

day 1296.00
day 1080.00
day 1080.00

7081.00
964.08
8045.08
0.00
0.00
8045.08
80.45

m 3690.00

Nos 56.00
Nos 192.00
Nos 819.00

Nos 408.00

Nos 192.00

Kg 115.00

day 1296.00
day 1080.00
day 1080.00

8928.00
1215.55
10143.55
0.00
0.00
10143.55
101.44

m 4250.00

Nos 56.00
Nos 192.00
Nos 1410.00
Nos 444.00

Nos 228.00

Kg 115.00

day 1296.00
day 1080.00
day 1080.00

10151.00
1382.06
11533.06
0.00
0.00
11533.06
115.33

m 8140.00

Nos 56.00
Nos 192.00
Nos 1785.00

Nos 612.00

Nos 336.00

Kg 115.00

day 1296.00
day 1080.00
day 1080.00

14692.00
2000.32
16692.32
0.00
0.00
16692.32
166.92

m 2420.00

Nos 88.00
Nos 219.00

Nos 264.00

Nos 48.00

Kg 230.00

day 1296.00
day 1080.00
day 1080.00
day 1128.00

7853.00
1069.19
8922.19
0.00
0.00
8922.19
89.22

m 1910.00

Nos 88.00
Nos 219.00
Nos 264.00

Nos 48.00
Kg 230.00

day 1296.00
day 1080.00
day 1080.00
day 1128.00

7343.00
999.75
8342.75
0.00
0.00
8342.75
83.43

m 3180.00
Nos 88.00
Nos 300.00

Nos 72.00

Kg 230.00

day 1296.00
day 1080.00
day 1080.00
day 1128.00
0
8454.00
1151.01
9605.01
0.00
0.00
9605.01
96.05

m 2540.00

Nos 88.00
Nos 300.00
Nos 72.00
Kg 230.00

day 1296.00
day 1080.00
day 1080.00
day 1128.00

7814.00
1063.88
8877.88
0.00
0.00
8877.88
88.78

m 3180.00

Nos 3.00

Nos 72.00

day 1296.00
day 1080.00
day 1080.00

6711.00
913.70
7624.70
0.00
0.00
7624.70
76.25

m 2540.00

day 648.00
day 540.00
day 1080.00
12.70

4820.70
656.34
5477.04
0.00
0.00
5477.04
54.77

m 3180.00

day 648.00
day 540.00
day 1080.00
15.90
5463.90
743.91
6207.81
0.00
0.00
6207.81
62.08

m 3690.00

day 648.00
day 540.00
day 1080.00
18.45

5976.45
813.69
6790.14
0.00
0.00
6790.14
67.90

m 6350.00

day 648.00
day 540.00
day 1080.00
31.75

8649.75
1177.66
9827.41
0.00
0.00
9827.41
98.27
m 1051.00

Nos 108.00

Nos 126.00

Nos 3.65

day 388.80
day 648.00
day 324.00
2649.45
360.72
3010.17
0.00
0.00
3010.17
501.70

m 1051.00
Nos 126.00
Nos 147.00
Nos 3.65

day 453.60
day 756.00
day 378.00
2915.25
396.91
3312.16
0.00
0.00
3312.16
473.17
m 1051.00
Nos 270.00
Nos 405.00

day 972.00
day 810.00
day 810.00
4318.00
587.90
4905.90
0.00
0.00
4905.90
327.06

Nos 27.00
Nos 18.00

day 43.42
day 36.18
124.60
16.96
141.56
0.00
0.00
141.56
141.56

Nos 44.00

Nos 65.00
day 64.80
day 54.00
227.80
31.01
258.81
0.00
0.00
258.81
258.81

Nos 30.00
Nos 44.00

Nos 65.00

day 64.80
day 54.00
day 54.00
311.80
42.45
354.25
0.00
0.00
354.25
354.25

Nos 32.00

Nos 115.00

day 32.40
day 27.00
206.40
28.10
234.50
0.00
0.00
234.50
234.50
Nos 32.00

Nos -21.00

day 32.40
day 27.00
70.40
9.58
79.98
0.00
0.00
79.98
79.98

Nos 250.00

Nos 90.00

day 81.00
day 67.50
day 67.50
556.00
75.70
631.70
0.00
0.00
631.70
631.70
Nos 21.00

Nos 3.64

day 32.40
day 27.00
84.04
84.04

Nos 18.00

Nos 17.00

Nos 32.00
Nos 11.00

day 32.40
day 27.00
137.40
18.71
156.11
0.00
0.00
156.11
156.11

Nos 45.00

Nos 14.00

day 40.18
day 33.48
132.66
18.06
150.72
0.00
0.00
150.72
150.72
Nos 102.00

Nos 25.00

day 40.18
day 33.48
200.66
27.32
227.98
0.00
0.00
227.98
227.98

Nos 240.00

Nos 44.00

day 40.18
day 33.48
357.66
48.70
406.36
0.00
0.00
406.36
406.36

m 2102.00
day 434.16
day 1080.00
day 361.80

3977.96
541.60
4519.56
0.00
0.00
4519.56
45.20

m 1051.00

day 220.32
day 540.00
day 183.60

1994.92
271.61
2266.53
0.00
0.00
2266.53
22.67

m 3110.00

day 434.16
day 1080.00
day 361.80

4985.96
678.84
5664.80
0.00
0.00
5664.80
56.65
m 5020.00

day 434.16
day 1080.00
day 361.80

6895.96
938.88
7834.84
0.00
0.00
7834.84
78.35

m 2510.00

day 220.32
day 540.00
day 183.60

3453.92
470.25
3924.17
0.00
0.00
3924.17
39.24

m 7666.00

day 648.00
day 1620.00
day 540.00

10474.00
1426.04
11900.04
0.00
0.00
11900.04
119.00

m 11656.00

day 648.00
day 1620.00
day 540.00

14464.00
1969.27
16433.27
0.00
0.00
16433.27
164.33

m 18060.00

day 648.00
day 1620.00
day 540.00

20868.00
2841.18
23709.18
0.00
0.00
23709.18
237.09
m 28560.00

day 648.00
day 1620.00
day 540.00

31368.00
4270.75
35638.75
0.00
0.00
35638.75
356.39
Nos 1351.00

Nos 50.00

day 108.22
day 90.18
day 179.82
6.76
1785.98
243.16
2029.14
0.00
0.00
2029.14
2029.14

Nos 2329.00

Nos 77.00

day 108.22
day 90.18
day 179.82
11.65
2795.87
380.66
3176.53
0.00
0.00
3176.53
3176.53
Nos 5578.00

Nos 248.00

day 108.22
day 90.18
day 179.82
27.89
6232.11
848.50
7080.61
0.00
0.00
7080.61
7080.61

Nos 7280.00

Nos 248.00

day 129.60
day 216.00
day 216.00
36.40
8126.00
1106.35
9232.35
0.00
0.00
9232.35
9232.35
Nos 8740.00

Nos 363.00

day 129.60
day 216.00
day 216.00
43.70
9708.30
1321.79
11030.09
0.00
0.00
11030.09
11030.09

Nos 13445.00

Nos 704.00

day 162.00
day 270.00
day 270.00
67.23
14918.23
2031.12
16949.35
0.00
0.00
16949.35
16949.35
Nos 22759.00

Nos 1425.00

day 162.00
day 270.00
day 270.00
113.80
24999.80
3403.72
28403.52
0.00
0.00
28403.52
28403.52

Nos 4135.00

day 108.22
day 90.18
day 179.82
4513.22
614.47
5127.69
0.00
0.00
5127.69
5127.69
Nos 7828.00

day 108.22
day 90.18
day 179.82
39.14
8245.36
1122.61
9367.97
0.00
0.00
9367.97
9367.97

Nos 10474.00

day 129.60
day 216.00
day 216.00
52.37
11087.97
1509.63
12597.60
0.00
0.00
12597.60
12597.60

Nos 14884.00

day 129.60
day 216.00
day 216.00
74.42
15520.02
2113.05
17633.07
0.00
0.00
17633.07
17633.07
Nos 22712.00

day 162.00
day 270.00
day 270.00
113.56
23527.56
3203.28
26730.84
0.00
0.00
26730.84
26730.84

Nos 27012.00

day 162.00
day 270.00
day 270.00
135.06
27849.06
3791.65
31640.71
0.00
0.00
31640.71
31640.71

Nos 0.00

day 0.00
day 0.00
day 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Nos 0.00

day 0.00
day 0.00
day 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Nos 6060.00

day 108.22
day 90.18
day 179.82
30.30
6468.52
880.69
7349.21
0.00
0.00
7349.21
7349.21
Nos 6813.00

day 108.22
day 90.18
day 179.82
34.07
7225.29
983.72
8209.01
0.00
0.00
8209.01
8209.01

Nos 7194.00

day 108.22
day 90.18
day 179.82
35.97
7608.19
1035.86
8644.05
0.00
0.00
8644.05
8644.05

Nos 8700.00

day 108.22
day 90.18
day 179.82
43.50
9121.72
1241.92
10363.64
0.00
0.00
10363.64
10363.64

Nos 16025.00

day 129.60
day 216.00
day 216.00
80.13
16666.73
2269.18
18935.91
0.00
0.00
18935.91
18935.91

Nos 20818.00

day 129.60
day 216.00
day 216.00
104.09
21483.69
2925.00
24408.69
0.00
0.00
24408.69
24408.69
Nos 26208.00

day 129.60
day 216.00
day 216.00
131.04
26900.64
3662.52
30563.16
0.00
0.00
30563.16
30563.16

Nos 760.00

Nos 367.00

Nos 804.00

day 324.00
day 270.00
day 540.00
9.66
3074.66
418.61
3493.27
0.00
0.00
3493.27
3493.27
Nos 800.00

Nos 367.00

Nos 1206.00

day 324.00
day 270.00
day 540.00
11.87
3518.87
479.09
3997.96
0.00
0.00
3997.96
3997.96

Nos 1045.00

Nos 367.00

Nos 1608.00

day 324.00
day 270.00
day 540.00
15.10
4169.10
567.62
4736.72
0.00
0.00
4736.72
4736.72
Nos 990.00

Nos 367.00

Nos 804.00

day 324.00
day 270.00
day 540.00
10.81
3305.81
450.09
3755.90
0.00
0.00
3755.90
3755.90

Nos 1245.00

Nos 367.00

Nos 1206.00

day 324.00
day 270.00
day 540.00
14.09
3966.09
539.98
4506.07
0.00
0.00
4506.07
4506.07

Nos 1505.00

Nos 367.00

Nos 1608.00

day 324.00
day 270.00
day 540.00
17.40
4631.40
630.57
5261.97
0.00
0.00
5261.97
5261.97

Nos 1500.00

Nos 367.00
Nos 2412.00

day 324.00
day 540.00
day 540.00
21.40

5704.40
776.65
6481.05
0.00
0.00
6481.05
6481.05

Nos 1500.00

Nos 890.00

Nos 2412.00

day 324.00
day 540.00
day 540.00
24.01

6230.01
848.22
7078.23
0.00
0.00
7078.23
7078.23

Nos 3750.00

Nos 956.00

Nos 3618.00

day 324.00
day 540.00
day 540.00
41.62

9769.62
1330.13
11099.75
0.00
0.00
11099.75
11099.75

Nos 2491.00

Nos 814.00

Nos 2412.00

day 324.00
day 540.00
day 540.00
28.59

7149.59
973.42
8123.01
0.00
0.00
8123.01
8123.01

Nos 2491.00

Nos 890.00

Nos 2412.00

day 324.00
day 540.00
day 540.00
28.97

7225.97
983.82
8209.79
0.00
0.00
8209.79
8209.79

Nos 7770.00

Nos 0.00
Nos 3618.00

day 324.00
day 540.00
day 540.00
56.94

12848.94
1749.38
14598.32
0.00
0.00
14598.32
14598.32
Nos 0.00

Nos 0.00

Nos 0.00
Nos 0.00

day 0.00
day 0.00
day 0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

Nos 0.00

Nos 0.00

Nos 0.00
Nos 0.00

day 0.00
day 0.00
day 0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

Nos 6045.00

Nos 890.00

Nos 0.00
Nos 1206.00

day 324.00
day 540.00
day 540.00
40.71

9585.71
1305.09
10890.80
0.00
0.00
10890.80
10890.80

Nos 9823.00

Nos 956.00

Nos 3820.00

Nos 1608.00

day 324.00
day 540.00
day 540.00
81.04

17692.04
2408.77
20100.81
0.00
0.00
20100.81
20100.81

Nos 6045.00

Nos 890.00

Nos 1101.00

Nos 2412.00

day 324.00
day 540.00
day 540.00
52.24

11904.24
1620.76
13525.00
0.00
0.00
13525.00
13525.00
Nos 9823.00

Nos 956.00

Nos 1464.00

Nos 2412.00

day 648.00
day 540.00
day 540.00
73.28

16456.28
2240.52
18696.80
0.00
0.00
18696.80
18696.80

Nos 9823.00

Nos 8700.00

Nos 3820.00

Nos 2412.00

day 648.00
day 540.00
day 540.00
123.78

26606.78
3622.51
30229.29
0.00
0.00
30229.29
30229.29
Nos 901.00

Nos 201.00

day 162.00
day 135.00
day 135.00
5.51

1539.51
209.60
1749.11
0.00
0.00
1749.11
1749.11

Nos 1700.00

Nos 955.00

day 213.84
day 178.20
day 178.20
13.28

3238.52
440.92
3679.44
0.00
0.00
3679.44
3679.44
cum 103.96

cum 558.50

165.62

m 887.50

Nos 16.32

Nos 96.00

Set 44.00

Nos 220.00

Kg 600.00

Kg 200.00

day 270.00
day 270.00
6.32
3438.22
468.11
3906.33
0.00
0.00
3906.33
3906.33
cum 155.32

cum 1160.43

328.94

cum 3917.47

cum 811.16

Sqm 728.82

m 887.50

m 57.60
Nos 63.00
Nos 83.00

Nos 16.32

Nos 96.00

Set 44.00

Kg 60.00
Kg 200.00
No 400.00

Nos 648.00
6.24
9663.80
1315.73
10979.53
0.00
0.00
10979.53
10979.53
cum 155.32

cum 1160.43

328.94

cum 3917.47

cum 811.16

Sqm 728.82

m 887.50
m 57.60
Nos 63.00
Nos 83.00
Nos 16.32

Kg 6050.00

Nos 96.00

Set 44.00

Kg 60.00
Kg 200.00
No 400.00

Nos 648.00
36.49
15744.05
2143.55
17887.60
0.00
0.00
17887.60
17887.60
Kg 707.20

Nos 66.00

day 1080.00

1853.20
252.31
2105.51
0.00
0.00
2105.51
21.06

Kg 455.60

Nos 66.00

day 1080.00

1601.60
218.06
1819.66
0.00
0.00
1819.66
18.2

Kg 299.20

Nos 66.00

day 1080.00

1445.20
196.76
1641.96
0.00
0.00
1641.96
16.42

Kg 176.80
Nos 66.00

day 1080.00

1322.80
180.10
1502.90
0.00
0.00
1502.90
15.03

Kg 8024.00

day 1296.00
day 1080.00

10400.00
1415.96
11815.96
0.00
0.00
11815.96
118.16

Kg 12784.00

day 1296.00
day 1080.00

15160.00
2064.03
17224.03
0.00
0.00
17224.03
172.24

Kg 16048.00

day 1296.00
day 1080.00

18424.00
2508.43
20932.43
0.00
0.00
20932.43
209.32

Kg 31895.50

day 648.00
day 540.00
day 540.00

33623.50
4577.84
38201.34
0.00
0.00
38201.34
382.01

Kg 8096.55

day 648.00
day 540.00
day 540.00

9824.55
1337.61
11162.16
0.00
0.00
11162.16
111.62

Kg 1694.00

day 648.00
day 540.00
day 540.00

3422.00
465.91
3887.91
0.00
0.00
3887.91
38.88

Kg 40111.50

day 1080.00
day 1080.00

42271.50
5755.26
48026.76
0.00
0.00
48026.76
480.27

Kg 102668.50

day 1080.00
day 1080.00

104828.50
14272.40
119100.90
0.00
0.00
119100.90
1191.01

m 1474.00

Kg 455.60

Nos 330.00

day 648.00
day 540.00
day 540.00
11.30
3998.90
544.45
4543.35
0.00
0.00
4543.35
45.43

m 2994.00

Kg 455.60

Nos 330.00

day 648.00
day 540.00
day 540.00
18.90

5526.50
752.43
6278.93
0.00
0.00
6278.93
62.79

m 3222.00

Kg 455.60

Nos 330.00

day 648.00
day 540.00
day 540.00
20.04

5755.64
783.63
6539.27
0.00
0.00
6539.27
65.39
m 5988.00
Kg 911.20

Kg 15.25

Nos 440.00

day 1296.00
day 1080.00
day 1080.00
36.77

10847.22
1476.85
12324.07
0.00
0.00
12324.07
123.24

m 6444.00

Kg 911.20

Kg 15.25
Nos 440.00

day 1296.00
day 1080.00
day 1080.00
39.05

11305.50
1539.24
12844.74
0.00
0.00
12844.74
128.45
m 10772.00

Kg 911.20

Kg 15.25
Nos 440.00

day 1296.00
day 1080.00
day 1080.00
60.69

15655.14
2131.45
17786.59
0.00
0.00
17786.59
177.87

m 3017.00

Kg 455.60
Nos 34.00
Nos 110.00

day 648.00
day 540.00
day 540.00

5344.60
727.67
6072.27
0.00
0.00
6072.27
60.72

m 3629.00

Kg 455.60
Nos 34.00
Nos 110.00

day 648.00
day 540.00
day 540.00

5956.60
810.99
6767.59
0.00
0.00
6767.59
67.68

m 6034.00

Kg 455.60
Nos 68.00
Nos 110.00

day 648.00
day 540.00
day 540.00

8395.60
1143.06
9538.66
0.00
0.00
9538.66
95.39

m 7258.00

Kg 455.60
Nos 68.00
Nos 110.00

day 648.00
day 540.00
day 540.00

9619.60
1309.71
10929.31
0.00
0.00
10929.31
109.29
m 5386.00

Kg 455.60
Nos 68.00
Nos 110.00

day 648.00
day 540.00
day 540.00

7747.60
1054.84
8802.44
0.00
0.00
8802.44
8802.44
88.02

kg 1067.50

Nos 36.00

Nos 200.00

Nos 270.00

Nos 25.00

7.99

day 81.00
day 67.50
1754.99
238.94
1993.93
0.00
0.00
1993.93
1993.93
kg 532.50

Nos 24.00
Nos 200.00

Nos 90.00
Nos 25.00
4.36

day 64.80
day 54.00
994.66
135.42
1130.08
0.00
0.00
1130.08
1130.08

Nos 200.00

Pair 300.00

Cum 486.64

Cum 82.55

Nos 200.00

Nos 75.00

Nos 324.00
Nos 540.00
2208.19
300.65
2508.84
0.00
0.00
2508.84
2508.84
kg #REF!

kg #REF!

Nos 200.00

kg #REF!

day 162.00
day 135.00
day 270.00
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

m #REF!
m 1424.30
Nos #REF!

day 1296.00
day 4320.00

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
m 15383.00

m 1538.30
Nos 2000.00

day 1296.00
day 4320.00

24537.30
3340.75
27878.05
0.00
0.00
27878.05
27878.05

m 25013.00

m 2501.30
Nos 2000.00

day 1296.00
day 4320.00

35130.30
4782.99
39913.29
0.00
0.00
39913.29
39913.29

Nos 0

day #REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
cum 518.00

cum 0.00

518.00
70.53
588.53
0
0
588.53

Nos 1955.33

419.04

day Err:509
day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

356.04

day #REF!
day #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

16.92
670.46

day #REF!
day #REF!
day Err:509
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

day 270.00
270.00
36.76
306.76
0
0
306.76
306.76

No 3129.00

156.45
day 270.00
3555.45
484.07
4039.52
0
0
4039.52
4039.52
No 1665.00
83.25
day 270.00
2018.25
274.78
2293.03
0
0
2293.03
2293.03
No 1665.00

83.25
day 270.00
2018.25
274.78
2293.03
0
0
2293.03
2293.03

8820.00

441.00
day 178.2
9439.20
1285.15
10724.35
0
0
10724.35
10724.35

6000

300
day 178.2
6478.2
882.01
7360.21
0
0
7360.21
7360.21
No 1260.00

No 45.00

1305.00
177.68
1482.68
0
0
1482.68
1482.68

No 643.00
No #REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

No 652.00

No #REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

No 2570.00

No 400.00

2970.00
0
0
0
2970.00
#REF!

#DIV/0!

#REF!
#REF!
#REF!
#REF!
#REF!

No #REF!

No #REF!

0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

No 2570.00

No #REF!
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
No 3975.00

No 900.00
0.00
4875.00
663.73
5538.73
0.00
0.00
5538.73
5538.73

No 4340.00

No 1350.00

0.00
5690.00
774.69
6464.69
0.00
0.00
6464.69
6464.69

No 4340.00

No 1100.00

0.00
5440.00
740.66
6180.66
0.00
0.00
6180.66
6180.66

No 1838.00

No 678.00

0.00
2516.00
342.55
2858.55
0.00
0.00
2858.55
2858.55

No #REF!
No #REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

No 3822.00

No #REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
No #REF!

No #REF!

0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

No #REF!
No #REF!
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

No #REF!

No #REF!

0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
No 536.00

No 60.00

0.00
596.00
81.15
677.15
0.00
0.00
677.15
677.15

No 1071.00

No 80.00

0.00
1151.00
156.71
1307.71
0.00
0.00
1307.71
1307.71
No #REF!
No 1100.00

0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

No 5765.00

No 1400.00

0.00
7165.00
975.51
8140.51
0.00
0.00
8140.51
8140.51

No 1040.00

No 0.56

No 1.18

day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 1040.00
No 0.56
No 1.18

day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 1040.00
No 0.56
No 1.18
No 14.00

day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 99.00
No 1040.00
No 0.00

day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 354.00
No 2080.00

day Err:509
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 354.00
No 2080.00

day Err:509
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 1040.00

day Err:509
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 355.00

No 1300.00

day Err:509
day Err:509
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 215.00
No

day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 385.00
No

day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No #REF!
No 12.00

day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 350.00
No

day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 578.00

578.00
78.69
656.69
0
0
656.69
656.69

No 766.00

No 45.00

0.00
811.00
110.42
921.42
0
0
921.42
921.42
Err:509
Err:509
No 1173.00

No 76.00

1249.00
170.05
1419.05
0
0
1419.05
1419.05

No 146.00

No 38.00

184.00
25.05
209.05
0
0
209.05
209.05
No 1615.00
No 76.00

1691.00
230.23
1921.23
0
0
1921.23
1921.23

No 2300.00

No 76.00

2376.00
323.49
2699.49
0
0
2699.49
2699.49

No 2300.00

No 76.00

2376.00
323.49
2699.49
0
0
2699.49
2699.49
No 540.00

No 120.00

660.00
89.86
749.86
0
0
749.86
749.86
Nos 750.00

Nos 115.00

day Err:509
day Err:509

Err:509
Err:509

No #REF!
No #REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

No #REF!
No 0.00

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

No #REF!
No 0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
No 50250.00

1005.00
51255.00
6978.37
58233.37
0
0
58233.37
58233.37

No 56490.00

1129.80
57619.80
7844.94
65464.74
0
0
65464.74
65464.74
day
day
day

day
day
day
Mtr 1000

day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 8150.00

day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 9250.00

day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 1590.00

day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 156.00

day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 410.00

day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 200.00

day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 242.00

day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 225.00

day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 485.00

day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 225.00

day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 475.00

day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 3750.00

75.00
75.00

3900.00
530.99
4430.99
0
0
4430.99
4430.99

No 810.00

day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 1805.00

day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 2250.00

day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
1760.00

240.00

18.00
97.40

28.85

72.00

2216.25

1840.00

240.00

18.00
97.40

28.85

Err:509
Err:509
Err:509

Err:509

day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 2714.00

54.28
2768.28
376.9
3145.18
0
0
3145.18
3145.18

No 1265.00

13.00
1278.00
174.00
1452.00
0.00
0.00
1452.00
1452.00

No 1350.00

14.00
1364.00
185.71
1549.71
0.00
0.00
1549.71
1549.71

0.00
10.00

day 39.51
day 47.87

97.40

0.00

day 28.84

28.85
0.00

day #REF!

#REF!

day #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

No #REF!

day #REF!
day #REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
M 10.40

day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

m 10.40

Kg 165.00

day Err:509
day Err:509
day Err:509
20.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 10900.00

218
11118.00
1513.72
12631.72
0
0
12631.72
12631.72

No 330.00

No 52.00

6.60

day Err:509
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

day
day
No 400.00

day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 275.00

day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 275.00

day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 5145.00

102.90

day Err:509
day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 7455.00

149.10

day Err:509
day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 9975.00

199.50

day Err:509
day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 14700.00

294.00
day Err:509
day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 19950.00

399.00

day Err:509
day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 24150.00

483.00

day Err:509
day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

day
day
day
day
day
day

day
day
day
day
day
day

day
day
day
day
day
day

day
day
day
day
day
day

day
day
day
day
day
day
day
day
day

day
day
day
day
day
day

day
day
day

day
day
day
day
day
day

day
day
day

day
day
day
day
day
day

day
day
day
day
day
day
day
day
day

day
day
day
day
day
day

day
day
day
day
day
day
No 17850.00

60

358.2

day Err:509
day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 21000.00

60.00

421.2

day Err:509
day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 25000.00

60.00

501.2

day Err:509
day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 33600.00

60.00

673.2

day Err:509
day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 780.00

day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 1450.00

day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
day
day

day
day

day
day
day
day

day
day
No 71.00

Kg 0.00

Km 0.00

E D P O L E S C O N F I R M I N G TO I.S : 2713 /1980

Length of Sections In Mtrs.


Top
5c

1.50
1.50
1.50
1.50
1.75
1.75
2.00
2.00
2.40
2.40
2.70
2.70
3.10
3.10
4.00
4.00
4.50
4.50
Total cost of
pole
11

Kg 2418.0

2418.0
329.21
2747.2

2747.21
2747.21

Kg 165.8
Kg 351.0
10

day 129.6
day 129.6
786.0
107.01
892.96

892.96
892.96

day
day

day
day
No

day
day

day
day
day
day

day
day

day
day
day
day

day
day
day
day

day
day

day
day
day
day
day
day

day
day
day
day
day
day

day
day
day
day
day

cum 55
cum 1105.08
Sqm 302.82

day #REF!
day #REF!
#REF!
#REF!
#REF!

#REF!
#REF!
day
day

4725.34

1024.00
2.49

5751.83

sqm 1168.7

1168.70
159.12
1327.82

1327.82
1327.82
No #REF!

1.00

day #REF!

#REF!

No

day

sq. #DIV/0!
inch

#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

sq.ft 456.18

9.12
136.85

182.47

182.47
136.85

1103.94
150.3
1254.24
0
0
1254.24
1254.24
13500.97

sq. #REF!
inch

#REF!
#REF!

#REF!

#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
No 2500.00

day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 2500.00

day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 4556.00

day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 2700.00

day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 10023.00

day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 175.00

day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 135.00

day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 450.00

day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 1050.00

day Err:509
0.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 3037.00

day Err:509
0.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Deleted

day

Deleted
Deleted

Deleted

Deleted

Deleted

Deleted
Deleted

Deleted

No 327.00

day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 491.00
day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 578.00

day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 654.00

day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 22.00

day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 30.00

day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 33.00

day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 40.00

day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 55.00

day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 65.00

day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 88.00

day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 104.00

day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 149.00

day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 215.00

day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 284.00

day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 418.00

day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 12.00

day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 14.00

day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 17.00

day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 20.00

day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 25.00

day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 27.00

day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 35.00

day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 40.00

day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 46.00
day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 71.00

day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 92.00

day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No 119.00

day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 1300.00

day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 1545.00

day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
No #REF!

day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 2230.00

day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 4000.00

day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No #REF!

day Err:509
day Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 5425.00

day Err:509
day Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

No 5940.00

3.51

No 3564.00

No 165.00

No 1080.00

day 1275.00

day 648.00
day 1080.00
day 1020.00

14775.51
2011.69
16787.20
0
0
16787.20
16787.20
167.87

No 5940.00
3.51

No 3564.00
No 165.00
No 1080.00

day 1275.00

day 1036.80
day 1782.00
day 1020.00

15866.31
2160.2
18026.51
0
0
18026.51
18026.51
180.27
ed for 60 Mts / day
not less than 600 mm in a trench. Sand filling shall be provided at the
e cable.
added forBricks shall
finished be provided on either side of the laid cable. Sand
item.

No
No
No
No

day
day
commissioning of following specifications of D.G. Set consists of Engine and
d
RD by/ means of flexible
CROMPTON cooping
on D.G.S & Dwith guard make.
approved and mounted on a common
The alternator base
of the output
15V, 50
AVES Hz., A.C., 0.8
/ CUMMINS P.f lagging
/ ASHOK LEY at 1500orRPM.
LAND DGS&DThe approved.
alternator is self excited,
Diesel Engine
et at 1500 RPM
fabricated withwith class A2
16 SWG Governing
CRCA so asThe
sheet steel. to enable
control the alternator
panel shall betototally
give
loor mounted2. /Ammeter
wall mounted type and
with Selector shall be comprising the following
Switch
ating 4. P.F. Meter and frequency Meter
6. KWH Meter of required rating

coustic enclosure (sound proof enclosure cum container) for the above Genset
c enclosure shall consists of self supporting frame work put together with help
and dismantling. The vertical and Horizontal structure 8is to be fabricated with

Deleted
Deleted

Deleted

Deleted
No 617400.00
61740.00

12348.00

691488.00
94146.09
785634.09
0
0
785634.09
785634.09

No 617400.00

61740.00

12348.00

691488.00
94146.09
785634.09
0
0
785634.09
785634.09

No 810000.00
81000.00

16200.00

907200.00
123515.28
1030715.28
0
0
1030715.28
1030715.28

No

0
0.00
0
0
0.00
0.00

No 1100000.00

110000.00

22000.00

1232000.00
167736.8
1399736.80
0
0
1399736.80
1399736.80
No

0
0.00
0
0
0.00
0.00

No 400000.00
8000.00

40000.00

448000.00
60995.2
508995.20
0
0
508995.20
508995.20

No 645000.00

12900.00

64500.00

722400.00
98354.76
820754.76
0
0
820754.76
820754.76

No 735000.00

14700.00

73500.00

823200.00
112078.68
935278.68
0
0
935278.68
935278.68

No 910000.00

18200.00

91000.00

1019200.00
138764.08
1157964.08
0
0
1157964.08
1157964.08
No 200.00

200.00
27.23
227.23
0
0
227.23
227.23
No 1100.00

1100.00
149.77
1249.77
0
0
1249.77
1249.77

No 500.00

500.00
68.08
568.08
0
0
568.08
568.08

day

day
day
day
day

No
day
day
day

No 1500.00

day 213.84
day 178.20

1894.04
257.87
2153.91
0
0
2153.91
2153.91

No 600.00

day 81.00
day 135.00

818.00
111.37
931.37
0
0
931.37
931.37

No 300.00
day 81.00
day 135.00

518.00
70.53
590.53
0
0
590.53
590.53

No 675.00

day 81.00
day 135.00

893.00
121.58
1016.58
0
0
1016.58
1016.58

No Err:509

day 648.00
day 540.00

1190.00
162.02
1354.02
0
0
1354.02
1354.02
No 7000.00

day 648.00
day 540.00
day 540.00

1730.00
235.54
1967.54
0
0
1967.54
1967.54

No 6100.00

day 648.00
day 540.00
day 540.00

1730.00
235.54
1967.54
0
0
1967.54
1967.54

No 5900.00

day 648.00
day 540.00
day 540.00

1730.00
235.54
1967.54
0
0
1967.54
1967.54

No 4000.00

day 648.00
day 540.00
0.00
5190.00
706.62
5898.62
0
0
5898.62
5898.62

KVAR 350.00

day 25.92
day 43.20
0.00
421.12
57.34
480.46
0
0
480.46
480.46

day 25.92
day 43.20
Kg 210.30

105.15

210.30

84.12

Kg 49.50

659.37
89.77
751.14
0
0
751.14
751.14

Kg 140.20

70.10

140.20

56.08

Kg 33.00

439.58
59.85
501.43
0
0
501.43
501.43

Kg 35.05

17.53

35.05

14.02

Kg 8.25

109.90
14.96
126.86
0
0
126.86
126.86

Kg 315.45

157.73

315.45

126.18

Kg 74.25

989.06
134.66
1125.72
0
0
1125.72
1125.72
Kg 1892.70

94.64

227.12

4.54

Kg 445.50

2664.50
362.77
3029.27
0
0
3029.27
3029.27

Kg 2243.20

112.16

269.18

5.38

Kg 528.00

3157.92
429.95
3589.87
0
0
3589.87
3589.87
Kg 3154.50

157.73

378.54

7.57

Kg 742.50

4440.84
604.62
5047.46
0
0
5047.46
5047.46

Kg 3995.70

199.79

479.48

9.59

Kg 940.50

5625.06
765.85
6392.91
0
0
6392.91
6392.91

Kg 4556.50

227.83
546.78

10.94

Kg 1072.50

6414.55
873.34
7289.89
0
0
7289.89
7289.89

Kg 7010.00

350.50

841.20

16.82

Kg 1650.00

9868.52
1343.6
11214.12
0
0
11214.12
11214.12

Kg 8412.00

420.60

1009.44

20.19
Kg 1980.00

11842.23
1612.32
13456.55
0
0
13456.55
13456.55

Kg 10515.00

525.75

1261.80

25.24

Kg 2475.00

14802.79
2015.4
16820.19
0
0
16820.19
16820.19

Kg 12618.00

630.90

1514.16

30.28

Kg 2970.00

17763.34
2418.48
20183.82
0
0
20183.82
20183.82

Kg 13068.00

1306.80

1960.20

98.01

Kg 2970.00

19403.01
2641.72
22046.73
0
0
22046.73
22046.73

No 179.00

89.50

268.50
36.56
305.06
0
0
305.06
305.06

No 231.00
115.50

346.50
47.18
393.68
0
0
393.68
393.68

No 306.00

153.00

459.00
62.49
521.49
0
0
521.49
521.49

No 319.00

159.5

478.50
65.15
543.65
0
0
543.65
543.65
No 489.00

244.50

733.50
99.87
833.37
0
0
833.37
833.37

No 84.00

42.00

126.00
17.15
143.15
0
0
143.15
143.15

No 40.00

20.00

60.00
8.17
68.17
0
0
68.17
68.17

No 38.00
No 54

92.00
12.53
104.53
0
0.00
104.53
104.53
CEMENT MORTARS WITH OP CEMENT
KODADA MUNICIPALITY
DATA BASED ON - 2016 - 2017 SSR
Sep-18
Qty Rate Per
a CEMENT MORTAR (1:1)
Cement 1440 Kg 4.600 1 Kg
Fine aggregate sand for Mortar 1.05 Cum 1493.00 1 Cum
Man mazdoor 0.2 Nos 510.00 1 Nos
Rate per cu.m. Rs

b CEMENT MORTAR (1:1.5)


Cement 960 Kg 4.600 1 Kg
Fine aggregate sand for Mortar 1.05 Cum 1493.00 1 Cum
Man mazdoor 0.2 Nos 510.00 1 Nos
Rate per cu.m. Rs

c CEMENT MORTAR (1:2)


Cement 720 Kg 4.600 1 Kg
Fine aggregate sand for Mortar 1.05 Cum 1493.00 1 Cum
Man mazdoor 0.2 Nos 510.00 1 Nos
Rate per cu.m. Rs

d CEMENT MORTAR (1:3)


Cement 480 Kg 4.600 1 Kg
Fine aggregate sand for Mortar 1.05 Cum 1493.00 1 Cum
Man mazdoor 0.2 Nos 510.00 1 Nos
Rate per cu.m. Rs

e CEMENT MORTAR (1:4)


Cement 360 Kg 4.600 1 Kg
Fine aggregate sand for Mortar 1.05 Cum 1493.00 1 Cum
Man mazdoor 0.2 Nos 510.00 1 Nos
Rate per cu.m. Rs

f CEMENT MORTAR (1:5)


Cement 288 Kg 4.600 1 Kg
Fine aggregate sand for Mortar 1.05 Cum 1493.00 1 Cum
Man mazdoor 0.2 Nos 510.00 1 Nos
Rate per cu.m. Rs

g CEMENT MORTAR (1:6)


Cement 240 Kg 4.600 1 Kg
Fine aggregate sand for Mortar 1.05 Cum 1493.00 1 Cum
Man mazdoor 0.2 Nos 510.00 1 Nos
Rate per cu.m. Rs

h CEMENT MORTAR (1:8)


Cement 180 Kg 4.600 1 Kg
Fine aggregate sand for Mortar 1.05 Cum 1493.00 1 Cum
Man mazdoor 0.2 Nos 510.00 1 Nos

Mortars,
Rate per cu.m. Rs

Mortars,
Amount

6624.00
1567.65
102.00
8293.65

4416.00
1567.65
102.00
6085.65

3312.00
1567.65
102.00
4981.65

2208.00
1567.65
102.00
3877.65

1656.00
1567.65
102.00
3325.65

1324.80
1567.65
102.00
2994.45

1104.00
1567.65
102.00
2773.65

828.00
1567.65
102.00

Mortars,
2497.65

Mortars,
869 of 2191 data-Parks-new

KODADA MUNICIPALITY
DATA BASED ON - 2018 - 2019 SSR

S.N Description Quantity Rate Unit

A HORTICULTURE - ( Based on Roads and Bridges Data -CHAPTER - 17 )


1 RBR-HRTC-1: Spreading of sludge farm yard manure or/ and good earth in required thickness (cost of sludge,
farm yard manure or/and good earth to be paid for separately) as per Specification 307 MORTH
Unit = cum
Taking output = 15 cum 15.00 Cum
a) Labour
Mate - day
Mazdoor (Unskilled) 1.040 day 510.00 1 day
b&c) Overheads & Contractors Profit 13.615%
Cost for 15 cum= a+b+c
Rate per cum = (a+b+c)/15

2 RBR-HRTC-2 : Grassing with 'Doobs' grass including watering and maintenance of the lawn for 30 days or more till
the grass forms a thick lawn free from weeds and fit for moving including supplying good earth if needed - as per
Specification 307 MORTH
Unit = sqm
Taking output = 100 sqm 100 Sqm
(i) In rows 15 cm apart in either direction
a) Labour
Mate 0.170 day 540.00 1 day
Mazdoor (Unskilled) for grassing 0.920 day 510.00 1 day
Mazdoor (Unskilled) for maintenance for 30 days 1.000 day 510.00 1 day
b) Machinery
Water tanker 6 KL capacity 0.50 hour 698.88 1 hour
c) Material
Doob grass -M-112 -Irrigation SSR (2015-16) 100.00 kg 6.00 1 kg
Total
d&e) Overheads & Contractors Profit 13.615%
Cost for 100 sqm = a+b+c+d+e
Rate per sqm= (a+b+c+d+e)/100
(ii) In rows 7.5 cm apart in either direction
a) Labour
Mate 0.00 day 540.00 1 day
Mazdoor (Unskilled) for grassing. 1.47 day 510.00 1 day
Mazdoor (Unskilled) for maintenance for 30 days 1.00 day 510.00 1 day
b) Machinery
Water tanker 6 KL capacity 0.75 hour 698.88 1 hour
c) Material
Doob grass -M-112 -Irrigation SSR 200.00 kg 6.00 1 kg

d&e) Overheads & Contractors Profit 13.615%


Cost for 100 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/100
NOTE : In the case of horticulture one mate has been provided for every 10 mazdoors as maintenance of grass and
plants require more care.

3 RBR-HRTC-3 : Making lawns including ploughing and breaking of clod, removal of rubbish, dressing and
supplying doobs grass roots and planting at 15 cm apart, including supplying and spreading of farm yard manure at
rate of 0.18 cum per 100 sqm- as per Specification 307 MORTH
Unit = sqm
Taking output = 100 sqm 100 Sqm
870 of 2191 data-Parks-new

a) Labour
Mate 0.00 day 540.00 1 day
Mazdoor (Unskilled) for preparation of ground 0.65 day 510.00 1 day
Mali for fetching doobs grass roots and grassing at 15 cm 1.00 day 540.00 1 day
apart
b) Machinery
Water tanker 6 KL capacity 0.50 hour 698.88 1 hour
Tractor with tiller 0.01 hour 464.80 1 hour
c) Material
Supply of farm yard manure at site of work ( HMDA FSR 0.18 cum 1183.00 1 cum
2014-15, item no.10, Pg.32
Fine grass -M-113 -Irrigation SSR (2015-16) 100.00 kg 8.00 1 kg
d&e) Overheads & Contractors Profit
13.615%
Cost for 100 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/100

(a) Planting flowering plants


Unit = Running metres 200 plants and 800 shrubs in two
rows in one km length of road where width of verge is 3m
and above.
Taking output = 1000 metres 1000 Rmt
a) Labour
Mate - day
Mazdoor (Unskilled) 13.20 day 510.00 1 day

b) Machinery
Water tanker6 KL capacity 6.00 hour 698.88 1 hour
c) Material
Plants - M-100 - Irrigation SSR(2015-2016) 200.00 each 40.00 1 each
Shrubs - M-166 - Irrigation SSR (2015-2016) 800.00 each 15.00 1 each
Manure sludge/Farm yard manure (-rate as per Yanam PSR 63.64 cum 1183.00 1 cum
2013-14, S.No.83, Code No.0160, Pg.64)

Pesticide 0.50 kg 454.00 1 kg


Cost of water 36.00 KL 98.00 1 KL

d&e) Overheads & Contractors Profit 13.615%


Rate per Km = (a+b+c+d+e)
Rate per 1 Rmt
4 RBR-HRTC-4 : Maintenance of lawns or Turfing of slopes (rough grassing) for a period of one year including
watering etc -as per Specification 307 MORTH
Unit = sqm
Taking output = 100 sqm 100 Sqm
a) Labour
Mali 10.00 day 540.00 1 day
b) Machinery
Water tanker 6 KL capacity 15.00 hour 698.88 1 hour
c) Material
Cost of water - M-189 -Irrigation SSR 90.00 KL 98.00 1 KL

d&e) Overheads & Contractors Profit 13.615%


Cost for 100 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/100

5 RBR-HRTC-5 ; Turfing lawns with fine grassing including ploughing, dressing including breaking of clods, removal
of rubbish, dressing and supplying doobs grass roots at 10 cm apart, including supplying and spreading of farm yard
manure at rate of 0.6 cum per 100 sqm - as per Specification 307 MORTH
871 of 2191 data-Parks-new

Unit = sqm
Taking output = 100 sqm 100 Sqm
a) Labour
Mate 0.00 day 540.00 1 day
Mazdoor (Unskilled) for preparation of ground 1.25 day 510.00 1 day
Mali for fetching doobs grass roots hedges and grassing at 1.50 day 540.00 1 day
10 cm apart
b) Machinery
Water tanker6 KL capacity 0.50 hour 698.88 1 hour
Tractor with tiller 0.01 hour 464.80 1 hour
c) Material
Supply of farm yard manure at site of work @ 0.6 cum per 0.60 cum 1183.00 1 cum
100sqm - ( HMDA FSR 2014-15, item no.10, Pg.32
Fine grass 100.00 kg 8.00 1 kg

d&e) Overheads & Contractors Profit 13.615%


Cost for 100 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/100

9 RBR-HRTC-9: Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground,
mixing the soil with decayed farm yard/sludge manure, planting the saplings, backfilling the trench, watering, fixing
the tree guard and maintaining the plants for one year- as per Specification 307 MORTH
Unit = Each
Taking output = 10 trees 10 Nos
a) Labour
Mate - day
Mazdoor (Unskilled) for planting 3.70 day 510.00 1 day
Mazdoor (Unskilled) for maintenance for one year 15.00 day 510.00 1 day
b) Machinery
Water tanker 6 KL capacity 2.00 hour 698.88 1 hour
c) Material
Sapling 2 m high 25 mm dia 10.00 each 20.00 1 each
Farm yard manure - -( HMDA FSR 2014-15, item no.10, 0.94 cum 1183.00 1 cum
Pg.32
Pesticide ( Neem seed Granules) as per quotation 0.50 kg 454.00 1 kg
Cost of water 12.00 KL 98.00 1 KL

d&e) Overheads & Contractors Profit 13.615%


Cost for 10 trees = a+b+c+d+e
Rate per trees = (a+b+c+d+e)/10
19 Tree Guard with MS Iron
Providing and fixing MS iron tree guard 60 cm dia and 2 metre high above ground level formed of 4 Nos (25 x 6 mm)
and 8 Nos (25 x 3 mm) vertical MS riveted to 3 Nos (25 x 6 mm) iron rings in two halves, bolted together with 8 mm
dia and 30 mm long bolts including painting two coats with paint of approved brand over a coat of priming, complete
in all respects.

Unit = Each
Taking output = one tree guard
a) Labour
Mate day 0.00 1 day
Blacksmith 0.250 day 564.00 1 day
Mazdoor (Unskilled) 0.300 day 510.00 1 day
b) Material
MS iron 25 x 6 mm 19.200 kg 44.50 1 kg
MS iron 25 x 3 mm 9.600 kg 44.50 1 kg
Add 5 per cent of cost of material for riveting, bolting and
welding accessories
c) Machinery
Tractor-trolley 0.040 hour 464.80 1 hour
872 of 2191 data-Parks-new

d) Painting
Painting two coats including priming 1.770 sqm 112.35 1 sqm

e&f) Overheads & Contractors Profit 13.615%


Rate per tree guard =a+b+c+d+e+f
1 The items of excavation and concreting to be measured and paid separately as per design .
2 . Rate of painting may be adopted from the chapter as Traffic signs.
5 BLD-CSTN-2-8 (16) : Filling with red earth in central divider portion with initial lead in layers not exceeding 15 cm
thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work
site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310)
Quarry rubish out put 6.00 Cum
a) Material
Red earth (C-Mat-S.No6) 6.00 Cum 549.00 1 Cum
b)  Labour
Mate (Labour -R&B-Second Class S.No-71) 0.00 day 540.00 1 day
Stone dust filling

Mazdoor (Labour -Irrigation-Unskilled-S.No.3) 0.31 day 510.00 1 day


Sub Total
b&c) Overheads & Contractors Profit 13.615%
Cost for 6 cum = a+b+c
Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per cum = (a+b+c)/6
Rate per 1 Cum
37 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix
(1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage
charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top
surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:
Cement (ENC-PH.Memo) 162.00 Kg 4.60 1 Kg
Coarse aggregate 40mm (C-Mat-S.No:57) 0.90 Cum 799.95 1 Cum
Fine aggregate- Sand (C-Mat-S.No:2) 0.45 Cum 1303.00 1 Cum
Water (including for curing) (Irrigation SSR-S.No:M189) 1.20 Kl 98.00 1 Kl
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire 1 hour 397.50 1 hour
Charges-Irrigation S.No16)
B. LABOUR:
Mason 1st class (Labour-Irrigation- skilled-S.No:11) 0.10 day 564.00 1 day
Mazdoor (Labour-Irrigation-Unskilled S.No1) 1.39 day 510.00 1 day
Sub - Total Rs
c.Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per One Cum Rs

38 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix m-20
(Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage
charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top
surface to the required level curing etc., complete for finished item of work with nomonal reinforcement
Unit : 1cum
A. MATERIALS:
873 of 2191 data-Parks-new

Cement (ENC-PH.Memo.No.146/Cement & Steel / T1 / 330.00 Kg 4.60 1 Kg


2013-14)
Coarse aggregate 20mm graded (C-Mat-S.No:47) 0.90 Cum 1406.20 1 Cum
Fine aggregate- Sand (C-Mat-S.No:3) 0.45 Cum 1493.00 1 Cum
Water (including for curing) (Irrigation SSR-S.No:M189) 1.20 Kl 98.00 1 Kl
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire 1 hour 397.50 1 hour
Charges-Irrigation
B. LABOUR: S.No16)
Mason 1st class (Labour-Irrigation- skilled-S.No:11) 0.10 day 564.00 1 day
Mazdoor (Labour-Irrigation-Unskilled S.No1) 1.39 day 510.00 1 day
Sub - Total Rs
c.Overheads & Contractors Profit 13.615%
Sub - Total
Add VAT @ 0%
Add Labour Cess @ 0%
Grand Total
Rate per One Cum Rs

39 BLD-CSTN-6-12-(67) : Construction of RR Masonary in Cement Mortor ( 1:6 ) Prop using hard granite stone
including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage
Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor
,Construction, Scaffolding Charges curing etc., complete for finished item of Work .
A. MATERIALS:
Cement 79.20 Kg 4.60 1 Kg
Coursed Rubble Stone ( C-Mat- Sn.10) 0.44 Cum 615.60 1 Cum
Rough Stone ( C-Mat- Sn.8) 0.50 Cum 936.60 1 Cum
Bond Stones 7Nos 0.24x0.24x0.39 =0.16cum( C-Mat- 0.16 Cum 1300.60 1 Cum
Sn.12)
Fine aggregate (Sand) 0.33 Cum 1303.00 1 Cum
B. LABOUR:
Mason 1st class 1.20 day 564.00 1 day
Mazdoor (unskilled) 2.00 day 510.00 1 day
Total A+B Rs
C.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per One Cum Rs

40 BLD-CSTN-6-6-(61) : Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite
stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage
Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor,
Construction, Scaffolding Charges curing etc., complete for finished item of Work .
A. MATERIALS:
Cement 76.80 Kg 4.60 1 Kg
Coursed Rubble Stone 0.94 Cum 615.60 1 Cum
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum 0.16 Cum 1300.60 1 Cum
Fine aggregate (Sand) 0.32 Cum 1303.00 1 Cum
B. LABOUR:
Mason 1st class 1.50 day 564.00 1 day
Mazdoor (unskilled) 2.32 day 510.00 1 day
Total A+B Rs
C.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per One Cum Rs
874 of 2191 data-Parks-new

41 BLD-CSTN-7-3-(74) : Providing raised Cement Pointing to RR Masonary in Cement Mortor (1:3) Prop . for including
cost & conveyance of all materials to site , seignaiorage charges on all materials, labour charges on all materials,
curing etc., Complete for finished item of work
A. MATERIALS:
Cement 28.80 Kg 4.60 1 Kg
Fine aggregate (Sand) 0.06 Cum 1303.00 1 Cum
B. LABOUR:
Mason 2nd class ( Labour-Irrigation-Semi skilled-Sn.35) 0.50 day 540.00 1 day
Mazdoor (unskilled) 0.74 day 510.00 1 day
Total Rs
C.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs

42 BLD-CSTN-8-2-(77) : Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and
conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all
operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for
finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:4) 0.15 Cum 3325.65 1 Cum
B. LABOUR:
Mason 1st class 0.60 day 564.00 1 day
Mazdoor (unskilled) 0.96 day 510.00 1 day
Total A+B
C.Overheads & Contractors Profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs

43 BLD-CSTN-11-4- (161) : White washing one coat with whiting of approved quality to give an even shade after
thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all
materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but
excluding conveyance charges of materials
Whiting / White Cement - TBSC-R.I-01 1.20 Kg 29.00 1 Kg
Gum, conjee water, or prickly pear juice including necessary LS
fire wood
Brick Layers / Painter ( Labour-Irrigation-Skilled-Sn.11) 0.11 day 564.00 1 day
Mazdoor (unskilled) 0.22 day 510.00 1 day

Sundries including brushes, ladders, etc., 0.50%

over heads & contractors profit 13.615%


sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Total cost
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs
875 of 2191 data-Parks-new

44 BLD-CSTN-2-9 (17) : Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations
and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering
and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire
charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
Earth filling (ordinary soil) out put 6.00 Cum
b) Labour
Mate (Labour -R&B-Second Class S.No-71) 0.00 day 0.00 1 day
Mazdoor (Labour-Irrigation-Unskilled S.No1) 0.31 day 510.00 1 day
b&c) Overheads & Contractors Profit 13.615%
Re filling

Cost for 6 cum = a+b+c


Add VAT @ 0%
Add Labour Cess @ 0%
Total
Rate per cum = (a+b+c)/6
Rate per 1 Cum

45 RBR-CCPV-13 - ii: Providing and Laying of Interlocking Concrete Block Pavements using precast concrete blocks for
paving of M-30 grade and thickness not less than 50 mm for Non traffic areas conforming to IS 15658:2006 in all
shapes and designs as per the manufacturer's Specification including cost and conveyance of all material and all
labour charges etc,. complete.
Unit = sqm
Taking output = 225 sqm
a)  Labour
Mate - day
Mazdoor (Unskilled) 15.90 day 510.00 1 day
Mason (2nd class) 7.00 day 540.00 1 day
b) Machinery
Water tanker 6 kl capacity 2.00 hour 698.88 1 hour
c) Material
i)Supply of CC Blocks - M30 (TBSC-C.IX-02)94 225.00 sqm 304.00 1 sqm
(ii) Edge blocks 60 m x 2 120.00 m 199.81 1m
(iii) Sand as per Table 1500.5 ( C-Mat-Sn.1) 5.42 cum 1303.00 1 cum
Bed = 603x75x 0.03 = 6.75 cum
Joints = 60x0.08 = 0.48 cum
(iv) Water for wetting of bedding sand 3.00 kl 98.00 1 kl

d&e) Overheads & Contractors Profit 13.615%


total
Add VAT @ 0%
Add Labour Cess @ 0%
Cost for 225 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/225 Rs

* 2. Edge blocks may be cast-in-situ. Brick masonry toe wall or CC block 300 mm x 300 mm x 150 mm or any other
shape can also be used and their cost shall be analysed/included accordingly
Cost of CC 1:2:4 without CP 1 Cum 4735.83
size of Edge Block 500 mm x 300 mm x 150 mm
Qty of each block of1.00 m length 0.045 Cum 4735.83 1 Cum
Overheads & Contractors Profit 13.615%
total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate for 1 Rmt
876 of 2191 data-Parks-new

46 BLD-CSTN-12-12-(193): Painting with Synthetic Enamel paints - One Coat - for New Wood Work, Old Wood Work &
New Iron Work including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and
all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).
Synthetic Enamel paint (at 20 sqm / litre as per British 1.10 Ltr 251.00 1 Ltr
Paints (I) Ltd. [ TBSC-G.V-02 ]
1st Class Painter 1.1 day. 648.00 1 day.
2nd Class Painter 0 day. 540.00 1 day.
Sundries including brushes, soap, putty etc.,
Total Rs
over heads & contractors profit 13.615%
sub total
Add VAT @ 0%
Add Labour Cess @ 0%
Rate per 10 Sqm Rs
Rate per 1 Sqm Rs

46 RBR-TSRA-29 : Cast in Situ Cement Concrete M20 Kerb: Construction of cement concrete kerb with top and bottom
width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick,
foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation
concrete laid manually, all complete as per clause 408 MORTH
Unit = Running metre
Taking output = 360 metre
Using Concrete Mixer
Cement Concrete
Cement concrete of grade M20 = 12.60 cum
Cement concrete of grade M10 for base= 11.61 cum
Total Concrete = 24.21 cu.m
a) Labour
Mate - day
Mason 2.00 day 540.00 1 day
Mazdoor 16.72 day 510.00 1 day
b) Machinery
Kerb casting machine @ 60 metres/hour 6.00 hour 348.32 1 hour
Concrete mixer 0.48/0.28 cum capacity(16) 12.00 hour 397.50 1 hour
Water tanker 6 KL capacity 5.00 hour 698.88 1 hour
c) Material
Crushed stone aggregate 20 mm nominal size 59 % 21.79 cum 1256.20 1 cum
Coarse sand 30 per cent 10.90 cum 1303.00 1 cum
Cement 11 per cent 5.70 t 4600.00 1t
Cost of water 30.00 KL 98.00 1 KL

d&e) Overheads & Contractors Profit 13.615%


Total
Add VAT @ 0%
Add Labour Cess @ 0%
Cost for 360 meter = a+b+c+d+e
Rate per metre = (a+b+c+d+e)/360
877 of 2191 data-Parks-new

ODADA MUNICIPALITY
ASED ON - 2018 - 2019 SSR

Amount in
Rs.

ads and Bridges Data -CHAPTER - 17 )


yard manure or/ and good earth in required thickness (cost of sludge,
aid for separately) as per Specification 307 MORTH

530.4
72.21
602.61
40.20

ss including watering and maintenance of the lawn for 30 days or more till
eds and fit for moving including supplying good earth if needed - as per

91.8
469.2
510.00

349.44

600.00
2020.44
275.08
2295.52
23.00

0
749.7
510.00

524.16

1200.00
2983.86
406.25
3390.11
33.90
e has been provided for every 10 mazdoors as maintenance of grass and

ploughing and breaking of clod, removal of rubbish, dressing and


t 15 cm apart, including supplying and spreading of farm yard manure at
ication 307 MORTH
878 of 2191 data-Parks-new

0
331.5
540.00

349.44
4.65

212.94

800.00
2238.53
304.78
2543.31
25.40

6732.00

4193.28

8000.00
12000.00
75286.12

227.00
3528.00
109966.40
14971.93
124938.35
124.94
Turfing of slopes (rough grassing) for a period of one year including
TH

5400.00

10483.20

8820.00
24703.20
3363.34
28066.54
280.70

assing including ploughing, dressing including breaking of clods, removal


ass roots at 10 cm apart, including supplying and spreading of farm yard
per Specification 307 MORTH
879 of 2191 data-Parks-new

0.00
637.50
810.00

349.44
4.65

709.80

800.00
3311.39
450.85
3762.24
37.60

d side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground,
dge manure, planting the saplings, backfilling the trench, watering, fixing
r one year- as per Specification 307 MORTH

1887.00
7650.00

1397.76

200.00
1112.02

227.00
1176.00
13649.78
1858.42
15508.20
1550.80

cm dia and 2 metre high above ground level formed of 4 Nos (25 x 6 mm)
to 3 Nos (25 x 6 mm) iron rings in two halves, bolted together with 8 mm
two coats with paint of approved brand over a coat of priming, complete

0.00
141.00
153.00

854.40
427.20

18.59
880 of 2191 data-Parks-new

198.86
1793.05
244.12
2037.17
be measured and paid separately as per design .
e chapter as Traffic signs.
in central divider portion with initial lead in layers not exceeding 15 cm
y watering and ramming including cost and conveyance of water to work
charges, hire charges of T & P etc., complete for finished item of work.

3294.00

0.00
158.10
3452.10
470
3922.10
0.00
0.00
3922.10
653.68
653.68
ture all works up to Plinth Level: Plain Cement concrete nominal mix
rse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
als like cement, sand, coarse aggregate water etc., to site , seigniorage
, for mixing , laying, concrete , ramming in 15 cm layers, finishing top
mplete for finished item of work.for foundation and under flooring bed.

745.20
719.96
586.35
117.60
397.50

56.40
708.90
3331.91
453.64
3785.55
0.00
0.00
3785.55

xture up to Plinth Level : Plain Cement concrete nominal mix m-20


ate ) using 20mm size Hard Granite Machine Crushed Graded Metal
als like cement, sand, coarse aggregate water etc., to site , seigniorage
, for mixing , laying, concrete , ramming in 15 cm layers, finishing top
mplete for finished item of work with nomonal reinforcement
881 of 2191 data-Parks-new

1518.00
1265.58
671.85
117.60
397.50

56.40
708.90
4735.83
644.78
5380.61
0.00
0.00
5380.61
5380.61

R Masonary in Cement Mortor ( 1:6 ) Prop using hard granite stone


als like Cement, Sand , Water, Granite Stones, including Seigniorage
for cutting Stones to required size and shape, mixing of Cement Mortor
c., complete for finished item of Work .

364.32
270.86
468.30
208.10
429.99

676.80
1020.00
3438.37
468.13
3906.50
0.00
0.00
3906.50

Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite
aterials like Cement, Sand , Water, Granite Stones, including Seigniorage
or cutting Stones to required size and shape, mixing of Cement Mortor,
c., complete for finished item of Work .

353.28
578.66
208.10
416.96

846.00
1183.20
3586.20
488.26
4074.46
0.00
0.00
4074.46
882 of 2191 data-Parks-new

ent Pointing to RR Masonary in Cement Mortor (1:3) Prop . for including


seignaiorage charges on all materials, labour charges on all materials,
rk

132.48
78.18

270.00
377.40
858.06
116.82
974.88
0.00
0.00
974.88
97.49

mm thick in single coat in CM (1:4) finished smooth including cost and


niorage charges on all materials, finishing, curing, scaffolding and all
c., including cutting grooves where ever necessary etc., complete for
10 Sqm.

498.85

338.40
489.60
1326.85
180.65
1507.50
0.00
0.00
1507.50
150.75

ne coat with whiting of approved quality to give an even shade after


e all dirt and remains of loose powdered materials including cost of all
ch as scaffolding, lift charges etc., complete for finished item of work, but

34.80
10.00

62.04
112.20
219.04
1.10
220.14
29.97
250.11
0.00
0.00
250.11
250.11
25.01
883 of 2191 data-Parks-new

ilable excavated earth (excluding rock) in trenches, sides of foundations


exceeding 15 cm thick, consolidating each deposited layer by watering
e of water to work site and all operational, incidental, labour charges, hire
tem of work. (APSS NO. 309 & 310)

0.00
158.10
21.53
179.63
0.00
0.00
179.63
29.94
29.94

Interlocking Concrete Block Pavements using precast concrete blocks for


ss than 50 mm for Non traffic areas conforming to IS 15658:2006 in all
rer's Specification including cost and conveyance of all material and all

8109.00
3780.00

1397.76

68400.00
23977.20
7062.26

294.00
113020.22
15387.70
128407.92
0.00
0.00
128407.92
570.70

masonry toe wall or CC block 300 mm x 300 mm x 150 mm or any other


be analysed/included accordingly

213.11
29.01
242.12
0.00
0.00
242.12
884 of 2191 data-Parks-new

hetic Enamel paints - One Coat - for New Wood Work, Old Wood Work &
nce of all materials to site, sales & other taxes, incidental, operational and
item of work. (APSS No. 1201, 1207 & 1212).
276.10

712.80
0.00
0.00
988.90
134.64
1123.54
0.00
0.00
1123.54
112.35

ete M20 Kerb: Construction of cement concrete kerb with top and bottom
mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick,
ond kerb stone, kerb stone laid with kerb laying machine, foundation
clause 408 MORTH

1080.00
8527.20

2089.92
4770.00
3494.40

27372.60
14202.70
26220.00
2940.00
90696.82
12348.37
103045.19
0.00
0.00
103045.19
286.24
Ref. to SSR Description of Item
Pg.No S.No. Item No
IRRIGATION SSR
STATEMENT OF RATES FOR MATERIALS FOR THE YEAR : 2018-19 GENERAL GUIDE LINES FOR REVI

GENERAL GUIDE LINES FOR REVISING RATES OF MATERIALS:

1 Average of the prevailing market rates, ignoring freak rates, shall be the criteria for fixing
2 market rates for materials.
3 The rates for materials shall be inclusive of all taxes, duties and other local levies.
4 The rates for materials shall be exclusive of seigniorage charges wherever applicable.
5 The rates for materials, except those for which lead charges are admissible as per the
statement of lead charges, shall be for all leads.
6 The rates provided for useful rubble / stone chips from excavation shall be at dump yard.

Sl No. DESCRIPTION OF MATERIAL

11 1 Acetylene gas
11 2 Asphalt 80/ 100 Grade
11 3 Binding wire
11 4 Burnt stone slab 10 cm thick
11 5 Ordinary Portland Cement (43/53 GRADE) * As per Monthly rates
Portland Pozzolana Cement *(Note: As per Monthly rate fixed by Sub-Committee
Portland Slag Cement *(Note: As per Monthly
11 6 rate fixed by
Chequered Sub-Committee)
plate
11 7 Coarse aggregate 10-4.75 mm(excluding seigniorage charges)
11 8 Coarse aggregate 20-10 mm(excluding seigniorage charges)
11 9 Coarse aggregate 40-20 mm(excluding seigniorage charges)
11 10 Coarse aggregate 80-40 mm(excluding seigniorage charges)
The aggregate rates mentioned above (from Sl.No.7 to Sl.No.10) are exclusive of
Seigniorage charges but including blasting charges of Rs.70/cum and 25% machine
crushing charges. However, if the metal is obtained from hand broken,
the blasting and crushing charges shall be deducted. The aggregate shall be HB
Stone of Granite, Dolamite, Dolerite and Trap. (Quartzite and Basalt with aggregate
impact of less than 20)

11 11 Coir brush
12 Copper sheet 16 SWG
12 13 Coursed rubble stone 30 x 30 x 45 cm(excluding Seigniorage charges)
12 14 Coursed rubble stone 30 x 30 x 60 cm(excluding Seigniorage charges) --Rs.28 each
12 15 Curing Compound
12 16 D - cord
12 17 Delay - noiseless trunk
12 18 Detonating fuse coil
12 19 Detonating shock tube / Cord relays
12 20 Detonator delay type
12 21 Detonator electric
12 22 Detonator ordinary
12 23 Empty cement bag
12 24 Explosive ANFO
12 25 Explosive ANFO high strength booster
12 26 Explosive small dia ( Kelvex-220 or equivalent)
12 27 (a)Fine aggregate/ sand(un- screened) for concrete items & filter items) (excluding
Seigniorage charges)
12 (b) Sand for filling(excluding Seigniorage charges)
12 29 Geo-textile ( filter fabric ) 160 gsm
12 30 Geo-textile ( filter fabric ) 200 gsm
12 31 Geo-textile ( filter fabric ) 250 gsm
12 32 G I Pipe 100 mm dia B Class
12 33 G I Pipe 15 mm dia A class
12 34 G I pipe 25 mm dia A class
12 35 G I pipe 40 mm dia B class
12 36 G I pipe 50 mm dia A class
13 37 G I Pipe 80 mm dia B Class
13 38 G.I Bolts / Nuts and Washers
13 39.a G.I sheet ( plain )
39.b G.I sheet (corrugated)
13 40 Hariyala turfing sods
13 41 Hectometer stone one line dressed
13 42 Hemp yarn
13 43 Honne wood planks
13 44 Hume pipe with collar 150 mm dia
13 45 Hume pipe with collar 300 mm dia
13 46 J- Bolts 30 cm long
13 47 Jungle wood planks
13 48 Khandki stone 15 to 20 cm height
13 49 Khandki stone 20 to 25 cm height
13 50 Khandki stone 25 to 30 cm height
13 51 Kilometer stone one line dressed
13 52 LDPE sheet ( Geo membrane ) 500 micron thick
13 53 LDPE sheet ( Geo membrane ) 750 micron thick
13 54 LDPE sheet ( Geo membrane ) 1000 micron thick
13 55 M S Bolts / Nuts / Washers
13 56 Murum(including loading charges but excluding Seigniorage charges )
13 57 Oxalic acid
13 58 Oxygen gas
13 59 PVC sealing strip
13 60 PVC water stopper 310 mm wide
13 61 PVC pipe of 100 mm dia
13 62 ( a) Reinforcement steel TATA,SAIL,VSP,Jindal as approved by Ministry of
63 ( b) Steel
BIS approved secondary producers confirming to IS:1786-2008 must have valid
13 63 licence and well
Resin bond established
Cement capsule TMT process of either Thermax, Tempcore, Evcon Turbo
& Turboquench
14 64 Rough stone 20 x 20 x 75 cm ( excluding Seigniorage Charges)
14 65.a Shahabad stone slab (excluding seigniorage charges and loading
charges)
65.b Shahabad stone slab with out polishing (excluding seigniorage charges and loading
charges)
14 66 Stone chips ( at dump yard / Spoil)(excluding seigniorage charges and loading
charges)
14 67 Stone chips ( at quarry )(excluding seigniorage charges and loading charges)
14 68 Structural steel angle / channel / beam / bars (including loading
charges)
14 69 Structural steel plate / flats (including loading charges)
14 70 Super Plasticizer ( Conplast RP-264 or equivalent )
14 71 Synthetic Enamel paint 1st quality
14 72 Synthetic adhesive ( Resin + Hardener )
14 73 Tar felt joint filler board 12 mm thick
14 74 Tar felt joint filler board 20 mm thick
14 75 Through stones 20 x 20 x 30 to 45 cm long (excluding seigniorage charges and loading
charges)
14 76 Through stones 25 x 25 x 45 to 60 cm long excluding seigniorage charges and loading
charges)
14 77 Through stones 30 x 30 x 65 to 75 cm long(excluding seigniorage
charges and loading charges)
14 78 Un-coursed rubble stones ( at dump yard /Spoil )(including
seigniorage charges and loading charges)
14 79 Un-coursed rubble stones ( at quarry )(excluding seigniorage charges and loading
charges)
14 80 Water proofing compound
14 81 Welding electrodes 4 mm dia
14 82 Wire brush
15 83 Wire mesh 20 gauge
15 84 Zinc chromate red oxide primer paint
15 85 inorganic zinc silicate
15 86 solvent less coal tar epoxy paint
15 87 Zinc phosphate primer
15 88 Allkyd based iron oxide paint
15 89 a) Cost of hdpe (80mm dia)
15 b) light black MS casing pipe
15 90 80mm steel
welded dia (4mm thick) 100X100X5 mm size
wire fabric
15 91 Protecitive mastic
15 92 Solventless coal tar epoxy (brown)
93 Excavaton of drain with Excavator
94 Crushed stone sand/Rock sand 4.75mm to 2.36 mm as per IS 383 (1970) (excluding
Seigniorage charges)
95 Fly ash conforming to IS: 3812 ( Part II & I)
96 Benching old embankment slopes 0.45 X 0.45 M
97 Laying of Sand Bags in the stipulated places including cost of empty cement bag, sand,
thread, stitching charges and labour charges etc., with 13.615% overhead charges and
contractors profit.
98 Rough stone for revetment 225mm thick ( including Loading charges but excluding
Seigniorage charges)
99 Eradication of Weed growth from Drains, Canals by spraying Chemicals
100 Thinner
101 Credit for excavated rock found suitable for use
102 Earth Cost or compensation for earth taken from private land (Excluding Seigniorage
Charges)
ADDITIONAL MATERIALS FOR GATES & HOISTS FOR THE YEAR : 201
Sl No. DESCRIPTION OF MATERIAL

16 1 Alloy steel ( IS : 1570-carbon steel ) shafts


16 2 Alloy steel ( IS : 1570-stainless steel ) pins
16 3 Bolt / Nut / Washer ( hot dipped galvanized )
16 4 Bolt / Nut / Washer ( stainless steel )
16 5 Bronze (IS:305)bearings/bushes
Aluminum alloy(IS:305)bearings/bushes
16 6 Cast iron blocks
16 7 Cast steel drums / gears
16 8 Cast steel pinions
16 9 Cast steel wheels / pulleys / hubs / rollers / retainers
16 10 Chemical for de-greasing/ derusting/phosphate coating
16 11 Coal tar epoxy paint
16 12 Forged steel hooks / shackles
16 13 MS pipe 200 / 300 mm dia
16 14 MS pipe 32 mm dia
16 15 MS pipe 25 mm dia
16 16(a) Rubber bottom seal ( IS : 11855 ) 120 X 16 mm
16 16(b) Rubber bottom seal ( IS : 11855 ) 120 X 20 mm
16 17 (a) Rubber side seal ( music note type Teflon claded ) ( IS : 11855 ) 36O
17 (b) 113 x 14side
Rubber mmseal ( music note type Teflon claded ) ( IS : 11855 ) 50O

16 18 (a) 125 x 16side


Rubber mmseal ( music note type uncladed ) ( IS : 11855 ) 36O 113 x 14 mm

18 (b) Rubber side seal ( music note type uncladed )


16 19 ( IS : 11855
Rubber side) seal
50O Z-type
125 x 16 mm
( IS : 11855 )
17 20 (a) Rubber corner seal ( Teflon claded ) ( IS : 11855 ) 36O 113 x 14 mm
20 (b) Rubber corner seal ( Teflon claded ) ( IS : 11855 ) 50O 125 x 16 mm
17 21 (a) Rubber corner seal ( un claded ) ( IS : 11855 ) 36O 113 x 14 mm
21 (b) Rubber corner seal ( un claded ) ( IS : 11855 ) 50O 125 x 16 mm
17 22 Stainless steel plates / flats
17 23 Welding electrode 4 mm dia x 450 mm ( radiographic low
hydrogen )
17 24 Welding electrode 4 mm dia x 450 mm ( stainless steel )
17 25 Wire rope 6x37 constn ( IS : 2266 )
17 26 Zinc
17 27 Zinc rich ( zinc content : 90 % ) epoxy primer

MATERIALS FOR POWER SUPPLY WORKS -2016-17


17 1 Electric pole with fixtures
17 2 Flood light 500 W
17 3 Flood light set
17 4 Flouscent tube light 40 W
17 5 Flouscent tube light set
17 6 HT / LT Circuit breaker with accessories
17 7 HT / LT Line conductor
17 8 PVC Armoured cable 10 sqmm and below
17 9 PVC Armoured cable 16 sqmm
17 10 PVC Armoured cable 25 sqmm
17 11 PVC Armoured cable 70 sqmm

DETAILS OF CAPITAL COST OF MACHINERY / EQUIPMENT FOR THE YEAR: 20


GUIDE LINES FOR FIXING CAPITAL COST OF MACHINERY / EQUIPMENT
18 1 Agitator car / Transit mixer 2 cum ( excluding tyres )
18 tyres and tubes 6 sets
18 2 Air compressor 5 cmm electric
18 3 Air compressor 7 cmm diesel
18 4 Air compressor 7 cmm electric
18 5 Air compressor 8.5 cmm diesel
18 6 Air compressor 8.5 cmm electric
18 7 Air compressor 15 cmm electric
18 8 Angle Dozer 90 hp
18 9 Batching plant 0.5 cum with accessories
18 10 Batching plant 2 x 1.00 cum with accessories
18 11 Batching plant 2 x 1.50 cum with accessories
18 12 Bending machine
18 13 Clamp shell and hoisting ropes
18 14 Concrete bucket 1.5 cum
18 15 Concrete hand mixer 45/30 ltr
18 16 Concrete mixer 300/200 ltr(diesel)
18 17 Concrete mixer 300/200 ltr ( electric )
18 18 Concrete mixer 600/400 ltr(diesel)
18 19 Concrete mixer 600/400 ltr ( electric )
19 20 Concrete paver 100 Sqm / hr
19 22 Convey mucker ( excluding tyres )
19 tyres and tubes 6 sets
19 23 Core drilling machine
19 24 Diesel generating set 30 KVA
19 25 Diesel generating set 50 KVA
19 26 Diesel Loco 45 hp
19 27 Dewatering pump 5 hp diesel
19 28 Dewatering pump 5 hp electric
19 29 Dewatering pump 10 hp diesel
19 30 Dewatering pump 10 hp electric
19 31 Dewatering pump 20 hp diesel
19 32 Dewatering pump 20 hp electric
19 33 Drifter
19 34 Drilling jumbo ( excluding tyres )
19 tyres and tubes 6 sets
19 35 Dumper 4.5 cum ( excluding tyres )
19 tyres and tubes 6 sets
19 36 Geophysical Ele.resistivity meter
19 37 Grouting pump
19 38 Guniting / sand blasting equipment
19 39 Ice plant with accessories 30 t / day
19 40 Jack hammer
19 41 Needle vibrator 40 mm petrol
19 42 Needle vibrator 40 mm electric
19 43 Needle vibrator 60 mm petrol
19 44 Needle vibrator 60 mm electric
19 45 Planing machine 4 m stroke
19 46 Plate shearing machine up to 12 mm
20 47 Pneumatic placer 0.5 cum
20 48 Pneumatic tamper
20 49 Pug cutting machine
20 50 Pusher leg
20 51 Road roller diesel 10 t
20 52 Shovel 0.50 cum 75 hp
20 53 Shovel 0.85 cum 110 hp
20 54 Stationery derrick crane 5 t
20 55 Tipper 5 cum ( excluding tyres )
20 tyres and tubes 6 sets
20 56 Tipping tub 1.5 cum
20 57 Tower crane 5 tonne
20 58 Transformer 250 KVA
20 59 Truck 10 t ( excluding tyres )
20 tyres and tubes 6 sets
20 60 Truck mounted derrick crane 5 t ( excluding tyres )
20 tyres and tubes 6 sets
20 61 Upright drilling machine
20 62 Ventilation fan 20 hp
20 63 Vibratory pad foot roller 8 t
20 64 Wagon drill
20 65 Water tanker 8000 ltr (excluding tyres)
20 tyres and tubes 6 sets
20 66 Welding set
20 67 Winch 35 hp electric
20 68 Hydraulic Truck Crane 30T
20 tyres and tubes 6 sets
20 69 Hydraulic Truck Crane 16T
20 tyres and tubes 6 sets
21 70 Heavy Duty Aireliness Spray Painting Equipment

ACCESSORIES TO MACHINERY / EQUIPMENT FOR THE YEAR : 2018-19


Sl No. DESCRIPTION OF MATERIAL

21 1 Casing shoe bit


21 2 Diamond core bit BX size
21 3 Diamond core bit NX size
21 4 Double tube core barrel
21 5 Extension drill rod with coupling sleeve
21 6 Jack hammer drill rod 1.5 m
21 7 Jack hammer drill rod 2.5 m
21 8 Nozzle for Guniting / sand blasting gun
21 9 Paving Cylinder
21 10 Rails 30R ( 30 kg / m )
21 11 Reamer shell
21 12 T.C.Cross bit 50 mm dia
21 13 T.C.Cross bit 75 mm dia
21 14 T.C.Cross bit 100 mm dia
21 15 Tyres and Tubes for truck
21 16 Wire rope 16 mm dia

OTHER COSTS ON MATERIAL / MACHINERY / EQUIPMENT FOR THE YEAR : 20


Sl No. DESCRIPTION OF MATERIAL
22 1 Air hose 25 mm dia
22 2 Air hose 50 mm dia
22 3 Demand charges ( HT-2B ) on power supply
22 4 Diesel
22 5 Electric power ( HT-2B category ) including tax
22 6 Excise duty on Gates / Hoist supplies
22 7 Insurance charges on machinery
22 8 Interest on capital cost
23 9 Lubricants
23 10 Petrol
23 11 Rivets
23 12 Road tax on transport vehicles
23 13 Shalimastic sealing compound
23 14 Shutter oil
23 15 Structural steel fabrication
23 16 Sundries ( Lump sum for un quantified inputs )
23 17 Water hose ( pressure ) 20 mm dia
23 18 Steel wedges
23 19 Elbows / Nipple / Plugs etc.,
23 20 Soldering materials
23 21 Steam circulation arrangement
23 22 Fuel charges ( gas for heating )
23 23 Vulcanizing materials
23 28 Gas cutting set ( 2 No’s 15 m hose and nozzle unit )
23 29 Grease
23 30 Welding holder set ( cable / holder / gloves / mask etc )
23 31 Use rate of ropes
MATERIALS FOR GATES AND HOISTS FOR THE YEAR : 2018-19

Sl No. DESCRIPTION OF MATERIAL


24 1 Worm reducers
24 2 Electric motor 20 hp(Double Shaft)
24 3 Electric motor 17.5 hp(Double Shaft)
24 4 Electric motor 12.5 hp(Double Shaft)
24 5 Electric motor 5 hp(Double Shaft)
24 6 Electric motor 3 hp (Double Shaft)
24 7 Electric motor 2 hp (Double Shaft)
24 8 Floating shaft 300 mm dia
24 9 Manual operating system
24 10 Gate position indicator
24 11 Ele-magnetic brake
24 12 Electric cable / switch / control panel etc
24 13 Wire rope sockets

Ref. to SSR Description of Item


Pg.No S.No. Item No

R & B SoR
RATES OF MATERIALS
(A) STONE AND ROAD MATERIALS
ROUGH STONE QUARRIED INCLUDING WEDGING, BREAKING, BURNING,
SPLITING AND STACKING
1 22.a For R.R Masonary Work (other than Granite, Dolomite and Trap)
2 b.I For SS Revetment work 225 mm
3 b.ii For SS Revetment work 300 mm
4 b.iii For SS Revetment work450 mm
5 c Jeddy Stone above 450 mm to 600 mm
6 d I. Laterite for revetment 225 mm
7 d II. Laterite for revetment 300 mm
8 d.iii Granite for SS revetment 225 mm
9 d.iv Granite for SS revetment 300 mm
Note:- Only when other granite is not available
10 e Laterite for masonry
11 f Cyclopean stones above 0.2 cum
12 g For R.R.Masonry works ( granite, dolamite and trap variety)
13 NOTE:- For items 22 (a) to 22 © and 22 (g) add extra Rs. /cum, wherever quarrying
is done by blasting
COURSED RUBBLE STONE QUARRYING WEDGING, BREAKING, BURNING AND
SPLITTING INCLUDING STACKING FOR SS FIRST SORT WORKS
14 23.a Granite, Dolamite and trap
15 b For other varieties
16 27 Granite stone slabs for culverts, lintels and copings (3 faces dressed coarsed rubble
masonry)
17 NOTE: - For items 23 (a), 23 (b) and 27 add extra Rs. Per Cum, wherever quarrying
is done by blasting
18 28 Bond stones ( 600 x 200 x 200 mm )
19 b Chainage stones and Centre line stones (750x150x150xmm)
19 29(a) Kilometer stones (1100x370x250mm)
b 5 th Kilometer stones (1520x520x250mm)

20 30(a) Hecto meter stones (900x200x200mm)

20 31 Demarcation Stones ( 900 x 150 x 150 mm)


21 32.a Guard Stones ( 1200 x 200 x 200 mm )
22 b Guide Stones ( 800 x 150 x150 mm )
23 c Carving letters and figures in stone up to 100 mm size
24 d Carving letters and figures in stone above 100 mm size
HARD BROKEN STONE OF GRANITE, TRAP AND DOLERITE FREE FROM DUST
OBTAINED BY QUARRYING, WEDGING, BREAKING, BURNING AND SPLITTING
INCLUDING STACKING.
25 33.a 6mm size -(IS383,1970
26 b 10mm size -(IS383,1970
27 c 12mm size - (IS383,1970
28 d 20mm size - (IS383,1970
29 e 25mm size - (IS383,1970
30 f 40mm size - (IS383,1970
31 g 50mm size - (IS383,1970
32 h 60mm size - (IS383,1970
33 I 65mm size - (IS383,1970
34 j 75mm size - (IS383,1970
35 k 75 to 100mm size - (IS383,1970
36 NOTE:- (1) Add extra Rs. /- per cum for items 33 (a) to 33 (k) if the metal is obtained
by blasting
37 (2) Add 25% extra per cum if the metal is obtained by machine crushing excluding cost
of blasting.
38 (3) Deduct Rs. /- per cum if the metal or rubble is obtained from surface stone and
boulders.
39 (4) Add Rs. /- per cum for selection of stones and boulders from excavated spoil
dumps for items 33 a to 33 k, when this addition of Rs. /- per Cum is allowed,
deduction of Rs. /- per Cum mentioned under Note (3) above should invariably be
made.
SOFT BROKEN STONE SCREENED AND FREE FROM DUST INCLUDING
STACKING
40 33.l - do - 40 mm size ( IS383,1970 )
41 33.m - do - 50 mm size ( IS383,1970 )
42 33.n - do - 60 mm size ( IS383,1970 )
43 33.o - do - 65 mm size ( IS383,1970 )
44 33.p - do - 75 mm size ( IS383,1970 )
HARD BROKEN STONE OF GRANITE TRAP DOLERITE AND DOLAMITE FREE
FROM DUST OBTAINED BY QUARRYING WEDGING, BREAKING, BURNING AND
SPLITTING INCLUDING STACKING (QUARTZITE AND BASALT WITH
AGGREGATE IMPACT OF LESS THAN 20)

45 33a -do- 2.36 to 5 mm size (IRC&MORTH)


b -do- 5 to 7mm size (IRC&MORTH)
46 c -do- 9.5 to 11.2mm size (IRC&MORTH)
47 d -do- 12mm to 14 mm size ( IRC and MORTH )
48 e -do- 19 mm to 22 mm size ( IRC and MORTH )
49 f -do- 25 mm to 27 mm size ( IRC and MORTH )
50 g -do- 40 mm to 45 mm size ( IRC and MORTH )
51 h -do- 50 mm to 55 mm size ( IRC and MORTH )
52 i -do- 60 mm to 63 mm size ( IRC and MORTH )
53 j -do- 65 mm size ( IRC and MORTH )
54 k -do- 75 mm size ( IRC and MORTH )
55 1 NOTE:- Add extra Rs. /- per cum for items 33 (a) to 33 (j) if the metal is obtained by
blasting
56 2 Add 25% extra per cum if the metal is obtained by machine crushing excluding cost of
blasting.
57 3 Deduct Rs. /- per cum if the metal or rubble is obtained from surface stones and
boulders
58 4 Add Rs. /- per cum for selection of stones and boulders from excavated soil dumps
for items 33 (a) to 33 (k), when this addition of Rs. /- per cum allowed deduction of
Rs. /- per cum mentioned under note (3) above should invariably be made

HARD BROKEN STONE OTHER THAN GRANITE SUCH AS QUARTZ, QUARTZ-


NAPA AND BASALT SCREENED AND FREE FROM DUST INCLUDING STACKING

59 33.q - do - 10 mm size (IS383,1970)


60 -do- 9.5 mm to 11.2 mm size ( IRC and MORTH )
61 r - do - 12 mm size (IS383,1970)
62 -do- 12mm to 14 mm size ( IRC and MORTH )
63 S - do - 20 mm size (IS383,1970)
64 -do- 19 mm to 22 mm size ( IRC and MORTH )
65 T - do - 25 mm size (IS383,1970)
66 U - do - 40 mm size (IS383,1970)
67 -do- 40 mm to 45 mm size ( IRC and MORTH )
68 V - do - 50 mm size (IS383,1970)
69 -do- 50 mm to 55 mm size ( IRC and MORTH )
70 33.w - do - 65 mm size (IS383,1970)
71 -do- 60 mm to 65 mm size ( IRC and MORTH )
72 X - do - 75 mm size (IS383,1970)
73 - do - 75 mm size ( IRC &MORTH)
74 Y - do - 75 to 100 mm size (IS383,1970)
75 - do - 75 to 100 mm ( IRC& MORTH)
OTHER ITEMS INCLUDING STACKING
76 33.z1 Laterite 40 to 75 mm ( ring)
77 z2 kankar, hard broken kankar 40 to 75 mm ( ring )
78 z3 Soling stone of 150 mm size of granite, trap and Dolamite varieties.
79 NOTE:- (1) Add extra for items to 33(z3) Rs /- Per cum, wherever quarrying is done
by blasting. (2) Wherever controlled blasting is resorted to the Chief Engineer
concerned shall approve the observed data in support of SS item No. 22 a to 22 c ,
22g, 23

80 z4 Soling stone of 150 mm size other than granite variety


81 z5 Soling Stone laterite, Kankar 150mm, surface stone
82 z6 Field picked metal unbroken 20 mm size
83 z7 - do - 25 mm size
84 z8 - do - 40 mm size
85 z9 - do - 50 mm size
86 z10 - do - 60 mm size
87 z11 - do - 80 mm size
88 NOTE:- Add Rs. /- Per Cum for selection of stone and boulders from excavated spoil dumps for items 33
(Q) TO 33 Z , when this addition of Rs. /- per Cum is allowed, deduction of Rs. /- per Cum should
invariably be made towards the metal or rubble if it is obtained from surface stone and boulders.

89 34 Gravel including stacking


90 35 a Quarry rubbish
91 B HBG Stone Chips 2.36mm and below
92 36.a Sand for mortar, ceiling coat including washing screening etc.,
93 36.b Sand for Concrete
94 36.c Sand for filling and blindage
95 37 Clay for puddle and masonry Items 38 (a) to 39 (h) As per local prevailing rates based
on competitive quotations.
(C) LIME AND CEMENT
96 40 to 41(c )

97 42 Cement excluding cost of empty cement bags for 1 MT

NOTE: (1) The rates are inclusive of sales tax. 2)As per the rates applicable to the District. 3) Least of the (1) and
(2 ) above may be allowed 4) The price of cement will be reviewed and fixed on monthly basis and rates will be
communicated separately.
98 a Labour for mixing cement mortar
99 b Mixing of cement mortar by machine
100 c Grinding lime mortar or Surkhi mortar
101 d Shell lime slaked and screened
102 e White cement
(D) MORTARS
103 43 to 45 Items 43 to 45

(E) METAL AND IRON WORKS


104 Mild steel rods 6mm dia.
105 Mild steel flats
106 Mild Steel, Structural Steel, I.e., Angles, Channels and I sections.
107 High Yield Strength Deformed Bars/TMT bars
108 Mild steel plates
NOTE: (1) The rates are inclusive of sales tax. 2) As per the rates applicable to the District. 3) Least of
(2 ) above may allowed 4) The prices of steel will be reviewed and fixed on monthly basis and rates will be com
separately.

109 1.a Clearing heavy Jungle


110 b Clearing light Jungle
111 c Clearing Scrub Jungle
112 d Clearing Juliflora (Prosafis) jungle including up-rooting and removing of Juliflora
stumps.
113 2.a.I Cutting and removing Palmyrah trees including stacking of girth 30 to 100 cm.
114 Ii - do - 100 to 200 cm.
115 2.b.I Uprooting and removing Palmyrah stumps including stacking of girth 30 to 100 cm.
116 Ii - do - 100 to 200 cm.
117 2.c.I Cutting and removing date trees including stacking of girth 30 to 100 cm
118 Ii - do - 100 to 200 cm
119 d.I Uprooting and removing stumps of date trees including stacking of girth 30 to 100 cm.

120 Ii - do - 100 to 200 cm


121 eI Cutting and removing other kind of trees including stacking of girth 30 to 100 cm
122 Ii - do - 100 to 200 cm
123 iii - do - above 200 cm
124 f.I Uprooting and removing stumps of other kind of trees including stacking of girth 30 to
100 cm.
125 Ii - do - 100 to 200 cm
126 iii - do - above 200 cm
127 3.a Uprooting and clearing prickly pear jungle
128 B - do - under 2.5 meters height including burning and burrying as directed.
129 C - do - over 2.5 meters height including burning and burrying with an initital lead of
conveyance
130 4.a Removing of natchu, goobi, thooti etc., from drains, channels including clearance if not
more than 1 metre depth of water with an initial lead of 10 metresand lift of 2 metres.

131 b.I Clearing alchi, tilla


132 b.ii Removal of Jammu
133 c.I Removal of imponea, cornea
134 c.ii Removal of water hyacinth upto 30 cm thick.
135 c.iii - do - more than 30 cm thick
136 d Removal of natchu, goobi, thooti etc., for every extra lead or lift over the initial lead or
lift.
(B) DISMANTLING
5 DISMANTLING, CLEARING AWAY AND CAREFULLY STACKING MATERIALS
USEFUL FOR REUSE.
137 n.(i) Dry rough stone revetment for aprons and stacking within 40 metres
(C) QUARRYING AND BLASTING
138 6 Blasting and removing hard granite measured in solid
7 Drilling holes in hard granite or sheet rock
a) Manually ( Hand)
139 I) 20 mm dia meter
140 ii) 25 mm dia meter
141 iii) 36 mm dia meter
b) Pneumatic Compressor
142 I) 20 mm dia meter
143 ii) 25 mm dia meter
144 iii) 36 mm dia meter
8 Grouting the holes with neat cement slurry excluding cost of steel
145 I) 20 mm dia meter
146 ii) 25 mm dia meter
147 iii) 36 mm dia meter
148 Binding wire
149 Jute rope
150 De bonding strips
151 Selent
152 Poly sheet 125 microns
153 Water charges (Rural)
154 Water charges (Urban)

Public Health Items


S. No. Description

1 RATES OF LABOUR (SKILLED WORKMEN)


1. Caulker
2. Plumber 1st Class
3. Plumber 2nd Class
4. Sewer Cleaner
5. Well Sinker
6. Pipe line Fitter 1st Class
7. Pipe line Fitter 2nd Class
8. Pump Driver
9. Bore Mechanic
10. Light Vehicle Driver
Note: The rate at relevant item in common SOR is applicable for occasional
employment.
2 RATES FOR EARTH WORK :
a. Earth work excavation in all soils for pipe lines, for drainage and water supply, where
the depth is more than 1.5 times the width.
b. Earth work excavation in all soils for pipe lines, for drainage and water supply, where
the depth is less than 1.5 times the width.
c. Earth work excavation in all soils for open trenches, for valve pits, inspection chambers,
etc.
3. a. Excavation of pipe line trenches for drainage and water supply in rock requiring blasting
with initial lead and lift including cost of blasting materials where the depth is more
than 1.5 times the width, in places where there is no habitation.

b. Excavation of pipe line trenches for drainage and water supply in rock requiring blasting
with initial lead and lift including cost of blasting materials where the depth is less than
1.5 times the width, in places where there is no habitation.
c. Cutting rock for pipe line trenches by hammers, nuckles and chisels including stacking
where the depth is 1.5 times or more than the width.

d. Cutting rock for pipe line trenches by hammers, nuckles and chisels including stacking
where the depth is less than 1.5 times the width.
e. Cutting rock for works other than pipe lines trenches by hammers, nuckles and chisels
including stacking.

f. For controlled blasting at restricted places


NOTE :- Rock should be measured in solids. In case it is not possible, stacks
should be made in which case 40% for voids to be deducted from the stack
measurements.

4 Loading or unloading materials such as C.I. Pipes, PVC Pipes, AC Pressure


Pipes, DI Pipes, SW Pipes, PVC Pipes, A.C/Specials less than 300 mm dia up to 4 m in
length including stacking.
a. C.I. Pipes/D.I. Pipes and fittings
b. A.C. Pipes & Specials
c. Stoneware pipes & Specials
d. P.V.C. Pipes and fittings
5 Loading or unloading materials such as C.I. Pipes, DI pipes, SW pipes, AC pressure
pipes & fittings/ specials from 300 mm to 600 mm dia up to 4 m in length including
stacking.
a. C.I. Pipes/D.I. Pipes and fittings
b. A.C. Pipes & Specials
c. Stoneware pipes & Specials
6 Loading or unloading materials such as C.I. Pipes, DI pipes, PVC pipes, AC pipes less
than 300 mm dia, above 4 m in length including stacking.
a. C.I. Pipes/D.I. Pipes and fittings
b. A.C. Pipes & Specials
c. P.V.C. Pipes and fittings
7 Loading or unloading materials such as C.I. Pipes, DI pipes, AC pipes from 300 mm to
600 mm above 4 m in length including stacking.

a. C.I. Pipes/D.I. Pipes and fittings


b. A.C. Pipes & Specials
Note:- For loading and unloading the above materials at Railway Stations, the
rates may be adopted based on the competitive quotations or the hammalae
charges if prevailing.
8. a. Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with s/s ends carefully into
trenches and laying them true to alignment and gradient including all sundries but
excluding cost and conveyance of pipes from source of supply (Ref to specifications.
BIS No.3114/1994)

DIAMETER OF PIPE/Fittings in mm :
80mm to 1000mm dia
8. b. Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with flanged ends
carefully into trench and laying them true to alignment and gradient including all
sundries but excluding cost and conveyance of pipes from source of supply. (Reference
to specifications. BIS No.3114/1994)

DIAMETER OF PIPE/Fittings in mm :
80mm to 750mm dia
800
900
1000
1100
1200
9. a. Jointing CI /DI pipes & fittings with s/s ends including cost of pig lead,hemp yarn and
sundries such as cost of fuel for melting lead, filling with water with lead up to 500m
and testing to required pressure complete. (Reference to specifications. BIS
No.3114/94/12288:1997)

DIAMETER OF PIPE/Fittings in mm :
80mm to 800mm
900
1000
1100
1200
9. b. Jointing C.I., D.I. pipes and fittings with rubber gasket (push-on-joint),excluding the cost
of the gasket but including all sundries filling with water, with a water lead up to
500m and testing to required pressure, etc. complete (Reference to
specifications IS 3114/1994/12888/1997)

DIAMETER OF PIPE/Fittings in mm :
80mm to 1000mm dia
10 Jointing CI pipes, fittings and valves with flanged ends including cost of jointing
materials such as bolts, rubber insertion, white lead including filling with water, with lead
up to 500 meters and testing to required pressure complete. (Reference to
specifications. BIS No.3114/1994.)
DIAMETER OF PIPE/Fittings/ valve in mm :
80mm to 750mm dia
800
900
1000
1100
1200
11a Lowering the RCC plain ended pipes carefully into the trench laying them true to
alignment and gradient, jointing RCC pipes with cement joints including curing, the
cost of jointing materials i.e., Cement Mortar (1:1.5), hemp yarn etc., and testing
including filling with water with a water lead up to 500 metres excluding cost of rubber
rings as per BIS No.783/85.

per every 25 mm dia.


11b Lowering the RCC S/S pipes carefully into the trenches laying them rue to alignment
and gradient, jointing with rubber rings and testing including filling with water with a
water lead up to 500 meters including cost of rubber rings as per BIS No. 783/1985

per every 25 mm dia.


80mm to 600mm
700
800
900
1000
12 Lowering and Jointing G.I. pipes and specials / fittings including excavation of trench of
0.5m width and 0.50 m depth in all soils except rock requiring blasting and refilling
trenches after laying and jointing pipes and also including cost of jointing materials but
excluding the cost of pipes. Reference to specifications. BIS No.783/85

a G.I. PIPES :
DIA in mm
15mm to 150mm
b Lowering, Laying, jointing of PVC/HDPE/MDPE pipes as per BIS No.7634 part-III/75
for PVC and BIS No.7634 part-II/75 for HDPE pipes including earth work excavation
and testing to hydralic test pressure including cost of water with a water lead of 500m
etc., complete.

DIA in mm
20
25
32
40
50
NOTE :- (i) The above rates are applicable for the works in istrict only.
(ii) If the depth of excavation is more than 0.5 m separate rates to be worked out.

13 Lowering and laying in ready made trench true to alignment and gradient, jointing, and
testing of Stone ware pipes including cost of jointing material such as cement mortar
(1:1) proportion and hemp yarn but excluding cost and conveyance of pipe.
(Reference to specifications BIS No. 6530/72)

DIA of Pipes in mm .
100mm to 450mm
14 Lowering, laying, jointing and testing to hydraulic test pressure including cost of
water with minimum water lead of 500m for UPVC pressure pipes in ready made
trenches true to alignment and gradient including all sundries but excluding cost &
conveyance of pipes from source of supply and jointing materials as per BIS No.7634 -
Part III - 1975

DIA of Pipes in mm .
63mm to 315mm
15 Laying and jointing of HDPE pipes in ready made trench by butt fusion welding as
per IS:7634 – part-II/1975 as amended from time to time to the alignment and
gradient and testing the pipeline to the required pressure.
Outer Dia of pipes in MM
63mm dia OD
75mm dia OD
90mm dia OD
110mm dia OD
125mm dia OD
140mm dia OD
160mm dia OD
180mm dia OD
200mm dia OD
225mm dia OD
250mm dia OD
280mm dia OD
315mm dia OD
355mm dia OD
400mm dia OD
450mm dia OD
NOTE:- For item 9 to 16 the element of testing charges is to be considered as
20% of the combined rate for laying, jointing and testing. This 20% shall be
released only after satisfactory testing of the pipe line to the required pressure.

16 Lowering, keeping in position and fixing C.I. sluice valves (with cap / with hand wheel &
Reflex valves) excluding cost of bolts, nuts, rubber insertion, sluice valve and tail
pieces
Dia of Valve in mm.
80mm to 600mm
17 Labour charges for fixing Air valves including boring the mains and threading the bore
fixing nipple etc., complete.
Dia of Air valve in mm.
25
40
50
80
18 Labour charges for fixing Kinetic Air Valves with isolating Sluice valves, Double Air
valves/ Air Cushion valve excluding cost of jointing materials such as bolts, nuts and
rubber insertions etc., complete.
Dia of Air valve in mm.
80mm dia (Double Air valves)
100mm dia (Double Air valves)
125mm dia (Double Air valves)
150mm dia (Double Air valves)
200mm dia (Double Air valves)
19 Uprooting C.I./ DI Pipes by melting the lead, loosening the joints, scraping the pipes,
hoisting and keeping within a lead of 10 m but excluding earth work excavation and
refilling.
80mm to 600mm
20 Uprooting of RCC pipes including breaking the collars, loosening the joint, separating
the pipes, hoisting and keeping within a lead of 10 m but excluding earthwork
excavation and refilling.

100mm to 300mm
21 Removing old G.I. pipes and specials / fittings and cleaning, scraping the pipes,
hoisting and keeping with in 50m lead but excluding earth work excavation of trenches
and refilling.
Dia of Pipes in mm
15mm to 50mm
22 Cutting C.I./ DI Pipes without water in mains. Dia of pipes in mm.
Dia of Pipes in mm
80mm to 600mm
700mm dia
750mm dia
800mm dia
900mm dia
1000mm dia
1100mm dia
1200mm dia
23 Cutting A.C. Pipes without water in mains. Dia of pipes in mm.
Dia of Pipes in mm
80mm dia
100mm dia
125mm dia
150mm dia
200mm dia
250mm dia
300mm dia
350mm dia
400mm dia
450mm dia
500mm dia
600mm dia
24 Drilling and tapping CI/ DI / GI Main and fixing brass screw down ferrule and plug.
10 mm to 20mm
25 mm to 40mm
6 25 Cutting road surface including stacking of excavated materials for pipe line trench work.

a) Cutting open B.T. road surface (as well as asphalt concrete up to 75 mm thick)
including water bound macadam
b) Cutting open C.C. road surface
c) Cutting open water bound macadam road including soiling
26 Bailing out water.(For PH item)
a) Bailing out water from the pipe line trenches with oil engine driven pump sets,
including hire charges, fuel charges and wages for Driver and Helper.

b) Bailing out water from the pipe line trenches with Electric Driven pump set including
hire charges, current charges and wages for
Driver and Helper.
NOTE:- The rate is payable on the total H.P. hours ignoring fractions less than 0.5
HP hour and rounding off 0.5 HP hour or more to the next higher integer.

27 Shoring and strutting of trenches for water and sewer main.


a) Single Staging from (0 to 2.5 Mts.)
b) Double staging from (2.5 m to 4.5 Mts.)
7 28 Barricading, hoarding, lighting and watching etc., for water supply and sewerage works
for trenches.
7 29 Excavation of trenches for infiltration galleries, syphon lines and connecting mains
in all soils under water including all leads, lifts, shoring, strutting, bailing out water and
removal of shoring and strutting materials, after completion of pipe line work.
a) 0 to 1 m deep under water.
b) 1 to 2 m deep under water.
c) 2 to 5 m deep under water.
d) Beyond 5 m deep under water for every additional 1 m depth over item 'c'
NOTE:- The above rates do not include rock requiring blasting or chiseling

7 30 Laying and jointing perforated RCC pipes inclusive of bailing out water and
jointing with cement fillets and all other incidental charges for infiltration gallery
inclusive of bailing out water by pumping to keep the trench reasonably dry to facilitate
the work excluding cost of perforated pipes and collars.
per every 25 mm dia/Per.
7 31 Centering and scaffolding charges for RCC members including all materials
and labour charges for forming and dismantling.
a) for R C C Elevated Service Reservoir of staging up to 15 metre below L W L.

1) Slabs for thickness (150 mm to 300 mm)


2) Slabs for thickness above (300 mm)
3) Side walls curved surfaces.
4) Side wall straight surfaces.
5) Top Dome.
6) bottom Dome.
7) Roof Slab.
8) Column braces and beams
9) Circular braces, ring beams & circular column.
10) Conical Slab 150 mm to 300 mm thickness
11) Conical Slab for above 300 mm thickness, extra for every 50mm thickness
Note:- For RCC ELSR of staging above 15 m, the % increase in these rates shall
be as follows.
15-18 m --- 9%
18-21m --- 15%
21-24 m --- 21%
24 m -27m --- 27%
above27m --- 30%

b) For Ground level works :-


1) Slabs
2) Beams & Lintels
3) Sun shades
4) RCC vertical walls of plane surface up to 3 m height such as ground level tanks
clarifiers and sludge digesters etc.
5) RCC vertical walls of circular faces up to 3 m height.
6) Dome
NOTE:- Scaffolding for every extra height of 1 m or part there of but not less than 0.5
m. The above centering charges are aplicable for water retaining structures only.
8 32 Lift or delift of materials :
a) Lifting of cement concrete for RCC elevated reservoir. For every 3m height or part
thereof over the initial lift of 3 m
b) Delifting the materials such as stones, concrete etc., for concrete below ground level
for construction of masonry ground level reservoirs, construction of masonry ground
level reservoirs, inspection wells,test wells and sump wells etc., for every 1 m depth or
part thereof beyond the initial depth of 4 meters from ground level.Rate / 1 cum.

33 Labour charges for fixing ventilating shafts complete with all accessories.
34 Labour charges for fixing water closets including fixing of foot rests (for all sizes).
35 Labour charges for fixing of flushing cistern including fixing of flush pipes, lead pipe,
jointing etc., complete
36 Labour charges for fixing wash hand basin including fixing of inlet and waste pipe
connections etc., complete
37 Fixing urinal with inlet and waste pipe connections etc., complete.
38 Refilling the trench for pipe line with excavated earth including watering and
tamping etc., complete
39 a) Extra allowance for isolated scattered works viz., valve pits /chambers, public
fountains, meter pits and manholes, delivery cistern etc., complete.
39 b) Repairs to the existing mains, interconnections, replacement of valves/specials
etc., including the cutting ,jointing, bailing out of water, drying, earth work
excavation etc., complete.

40 Removal of wet silt and sludge from sullage drains, with aid of baskets and vessels,
etc with initial lift of 3 m and lead of 50 m.
41 Well sinking in sandy and other loose soils under water either by manual labour, divers,
or dredgers, weighting the top of staining to assist sinking etc., including dewatering
and other incidental charges such as hire charges for mechanical equipment etc

Up to 2 m below GL/m
From 2 to 4 m below GL/m
From 4 to 6 m below GL/m
From 6 to 8 m below GL/m
From 8 to 10 m below GL/m
Note:-Below 10 m for every metre depth or part thereof add Rs.250/- per
m. For higher dia, observed data is to be prepared and got approved.

42 Sinking in Hard strata other than rock but in soils like limestone,gravel, clay under water
including, pumping dewatering, hire charges for mechanical equipment etc., complete.

43 Rates for OHSRs/ELSRs including fixtures with a staging of 15 m, without


Seismic analysis.
a 500 Kilo litres
b 1000 Kilo litres
c 1500 Kilo litres
d 2000 Kilo litres
e 2500 Kilo litres
1) The above rates are arrived with base rate of Cement Rs.4750/- per MT & Steel for
Rs.47000/- per MT for the month of May 2018
2) All concrete components shall be designed with M30 Design Mix proportion.
3) For intermediate capacities proportional rates shall be adopted.
4) The foundations shall be designed for Annular Raft Footings.The above rates are
applicable for Elevated Level Services Reservoirs / OHSRs for SBC of 15 T/Sqm.
a) For every decrease of 2.50 T/Sqm of SBC, the rate shall be incresed by 2.50% on 
basic rate .
b) For every increase of 2.5 T/Sqm of SBC, the rate shall be decreased by 1.0% on 
basic rate.
c) For SBC below 10T/sqm , solid raft shall be provided and for solid raft the rate shall
be increased by 10% on basic rates 
5) For staging less than 15 m, the rate shall be decreased by Rs.0.05 paise on basic
rate per litre per every metre decrease in staging.
6) For staging above 15 m, the rate shall be increased by Rs.0.10 paise on basic rate
per litre per every metre additional staging.

7) The above rates shall be increased / decreased due to increase/decrease in the cost
of cement by
Basic rate x (Rc-4750)/4750 x 0.069
Rc = Rate of Cement (Rs per MT) at the time of preparation of estimate.
8) The above rates shall be increased / decreased due to increase/decrease in the cost
of Steel by
Basic rate x (Rs-47000)/47000 x 0.135
Rs = Rate of Steel (Rs per MT) at the time of preparation of estimate.
The above formula applicable only for preparation of estimate. The price adjustment
shall be adopted on the actual consumtion of Steel and Cement.
9) Rate inclusive of three coats of epoxy paint Food Grade of best quality to inner
surface of the Reservoir including roof.
9.b) Rate inclusive of 2 coats of weather proof emulsion painting for external surfaces,
lettering, all required fixtures, Pipes,Pipe specials, valves of DI material, Valve
chambers etc., for pipe connections including cost of pipes,specials and valves as per
departmental directions and drawings
10) The above rates adopted for a wind pressure upto "250 kg/sq m". For every 100
kg/sqm decrease in wind pressure, the rate shall be decreased by 5%
11).a. The Basic rate is adopted by considering the design for Seismic forces for
Zone-II only of seismic zones.
11.b). The basic rates shall be increased by 15 % for Zone-III of seismic zones.

12. The ELSR/OHSR shall be designed with minimum of two rows of


columns for capacities above 500 KL & upto 1000KL.
13. The ELSR/OHSR shall be designed with minimum of three rows of columns for
capacities above 1000KL.
14) The basic rate is inclusive of following Fixtures
i) Pipe connections & Specials with D.I materials
a) All pipe conections for Inlet, Out let, Over Flow, Scour pipes shall be provided with
D/F DI material.
b) The Valves for above pipe connections also shall be of DI material of PN 16
c) All specials such as Bends,Tees, Reducers, Duckfoot Bends,Bell mouths etc,. shall
be of DI material.
II) The sizes of the verticals for ELSR/OHSR shall be:
a) For 500 KL to 750 Kl ELSRs
Inlet Pipe - 300mm dia.
Out let Pipe - 350mm dia and DI Valves 02 Nos
Over Flow pipe - 350m dia
Scour Pipe - 200mm dia
b) For 800 KL to 1500 Kl ELSRs
Inlet Pipe - 400mm dia.
Out let Pipe - 450mm dia and DI Valves 02 Nos
Over Flow pipe - 450m dia
Scour Pipe - 200mm dia

c) For above 1500 KL to 2500 Kl ELSRs


Inlet Pipe - 400mm dia.
Out let Pipe - 500mm dia and DI Valves 02 Nos
Over Flow pipe - 500m dia
Scour Pipe - 200mm dia

iii) Manhole Frames & Covers


a) All man hole Frames & Covers shall be made of CI/DI materials with min. size of
0.60mX 0.60m - For Roof & Valve Chambers.
iv) CI/D.I Double Swan neck ventilators (min.of 150mm dia) shall be provided in top
dome and slab with mosquito/fly proof nets - 4Nos.
v) RCC Finial ventilator with fly/bird protection with GI mesh - 1 No.
vi) RCC precast ladders of 0.60 m width - 2 Nos.
vii) RCC dog legged stair case of 1.00 m flight width and 1.20 m landing width R.C.C
hand railing of 1.0 m height – 1 No
viii) The staircase shall be enclosed with brick masonary walls on three side and
collapsible MS gate on front side up to 1 st brace level, to prevent unauthorized entry.

ix) Construction of R.C.C valve chambers as per Standard Drawings with RCC cover
slab fixed with CI/DI manhole Frame & Cover with lock and Key arrangement.The Mix
shall not be less than VRCC M 20 grade with 150mm thick side walls, 150mm thick top
slab, 150mm thick base slab over base course of 100mm thick (1:4:8) prop.
x) Balcony of 1.00 m width at floor slab level / middle ring beam level by using Stainless
Steel pipe of grade 304 hand railing up to 1.20 m height, with top railing of 40mm dia
pipe & middle railing of 25mm dia and verticals with 40mm dia at an interval not more
than of 1.00m c/c.
xi) Water Level Indicator of reputed make – Digital type (1 No) and Conventional type
(1 No)
xii) Lightening Arrestor with all its accessories complete including earthing,with relevant
IS Codes - 1 No.
44 Rates for OHSRs/ELSRs including fixtures with a staging of 12 m for Zone-II
Seismic analysis.
a Up to 10,000 Litres capacity
b 15,000 Litres capacity
c 20,000 Litres capacity
d 40,000 Litres capacity
e 60,000 Litres capacity
f 1,00,000 Litres capacity
g 1,20,000 Litres capacity
h 1,50,000 Litres capacity
i 2,00,000 Litres capacity
j 2,50,000 Litres capacity
k 3,00,000 Litres capacity
l 4,00,000 Litres capacity
m 4,50,000 Litres capacity
NOTE:-1) For intermediate ranges proportional rates may be adopted.All VRCC shall
be in M30 grade design mix.
2)The above rates are applicable for Elevated Level Services Reservoirs / OHSRs with
RAFT FOUNDATION and a rate of Rs.4750/- per tonne for cement and Rs.47000/- per
tonne for steel. for the month of May 2018
3) For every metre of staging less than 12 m, the rate shall be reduced by Rs.0.05
paise per litre per every metre of difference in staging
4) For every metre of staging above 12 m , the rate shall be increase by Rs.0.10 paise
per litre per every metre of additional in staging
5)The above rates shall be increased / decreased due to increase / decrease in the
cost of cement by
Basic Rate x (Rc-4750)/4750 x 0.069
Rc = Rate of cement (Rs per MT) at the time of preparation of estimate

6)The above rates shall be increased / decreased due to increase / decrease in the
cost of steel by
Basic Rate x (Rs-47000)/47000 x 0.135
Rs = Rate of steel (Rs per MT) (Fe-500/500D/550D from Primary Producers) at the
time of preparation of estimate.

The above formula applicable only for preparation of estimate. The price adjustment
shall be adopted on the actual consumtion of Steel and Cement.
7) Rate inclisive of three coates of epoxy paint to inner surface of the reservoir
including roof dome.
8) The above rates be adopted for estimate purposes for construction of ELSR for a
finished work including 2 coats of wheather proof emulsion painting for external
surfaces, lettering, all required fixtures, pipes, bends, valves etc., for pipe connections
but excluding cost of pipes,bends and valves as per departmental designs and
drawings.
9) The above rates are applicable for wind pressures upto 250 kg / sq m .For
decrease in wind presure the rate has to be decreased by 5% per every
100kg/sqm. If the ELSR / OHSR is to be designed for seismic forces also, cost
shall be arrived by working out detailed quantities based on the designs

10) For Tribal/Agency area, the above rates shall be increased by 5%.
11) If the ELSR is to be designed for seismic forces a) The above rates are applied
upto Zone-II of Seismic Zone. b) for Zone-III earth quake the above rates are to be
increased by 15%.
12) Fixtures include :
a) RCC or Aluminium ladder inside 0.60 m wide.
b) spiral staircase on the outside shall be provided upto 200KL ELSR. Above 200KL
ELSR Capacity dog legged staircase shall be provided with staircase flight width of
1.0mts and landing width of 1.20mts with S.S railing upto 1.0 height.
c) Lightening arrestor, including conductor and earthing etc.
d) RCC ventilators with copper or stainless steel fly proof mesh.
e) D.I Manholes frame and cover 0.60x0.60 m as per IS specifications (light duty) - 2
Nos.
f) Water level indicator of good quality with ebonite/ copper float approved pattern - 1
No.
g) The ladder shall be with M.S ladder and Verticals with HDPE of 10kg/Sqcm shall be
provided for single column OHSRs only.
h) Minimum staging for all ELSR/OHSR shall be 12.0mts.
i) The increase in staging shall be at 1.0mt interval.
j) The railing provided to the gallery and stair case shall be with stainless steel of grade
304 for a height of 1.00mts.
k). The dog legged staircase shall be enclosed with brick/CRS wall on three sides and
front side with M.S collapsible gate upto 1st brace level from ground level to prevent
unauthorized entry.
l). D.I swan neck ventilators shall be provided in top dome and slab.
m). The above rates are exclusive of all inlet, out let conenction and valves. All valves
near inlet, out let and for scour of ELSRs shall be D.I valves.
n) The above rates are exclusive of all inlet, outlet connection and valves. All
valves near inlet, out let and for scour of ELSRs shall be D.I valves.
45 Construction of Rapid Gravity Filtration Plant including all civil, mechanical and
electrical works using sand as filter media, duly following relavant IS codes in
the design of plant components including trial running for 90 days etc., complete

1) 2.0 Mld
2) 5.0 Mld
3) 10.0 Mld
4) 20.0 Mld
5) 30.00 Mld and above
NOTE :-
a) For intermediate ranges proportional rates may be adopted
b) The above rates are arrived with base rate of Cement Rs.5500/- per MT & Steel for
Rs.47000/- per MT for the month of May 2016
c)The above rates shall be increased / decreased due to increase / decrease in the
cost of cement by
Basic Rate x (Rc-4750)/4750 x 0.069
Rc = Rate of cement (Rs per MT) at the time of preparation of estimate only
d)The above rates shall be increased / decreased due to increase / decrease in the
cost of steel by
Basic Rate x (Rs-47000)/47000 x 0.135
Rs = Rate of steel (Rs per MT) (Fe-500/500D/550D from Primary Producers) at the
time of preparation of estimate.
e) For rural areas an extra allowance of 10% shall be given on basic rate.
The components of the Filtration Plant are as follows.
A) Civil Works: (All works of VRCC Shall be in M30 design mix)
1). Stilling Chamber and Areation cascade
2) Settling chamber shall be provided for 10 MLD and above capacities of
WTP for a minimum of 1 hour capacity
3). Raw water channel with Stainless Steel Weir of SS304L Grade material and also
with digital flow meters
4) Flash Mixer chamber with Flash mixing arrangements including SS shaft & SS
Blades with gear wheel arrangements etc, Using 304L Grade Steel.
5) Clariflucculator / Flocculation tanks with the components of central driven circular
clarifier with scrapper & bridge arrangements made with Stainless Steel Grade 304 L
tubes /angulars for durability & chemical resistant with wheel arrangements etc,.

6) Filter house, Chemical house, Alum store, Laboratory room , Chlorination plant room,
toilet etc. (All structures shall be provided RCC roof only).Chemical house &
Chlorinator rooms are to be isolated.
7) Wash water tank of suitable capacity shall be constructed at minimum clearance of
2.00m, above the roof slab of Filter beds / any other structure.
8) All the Doors and Windows shall be of Aluminium.The entrance door shall
be minimum size of 2.40 X 2.40 mts.
9) All pipes and valves in Plant shall be of D.I. materials. All the Connecting pipes of
the plant coponents such as from Flash mixer to Clarifloculator/ Clarifier/Flocculation
tank, to Filter beds, sludge disposal pipes shall be of D.I. material. The size of sludge
disposal pipe shall be minimum of 450 mm dia with D.I D/F pipe.

10) The Pipe gallery way for Clear water/ Back wash water/ pipe connections shall be
suffuiciently spaced for easy operation & maintenance and inspection .
11) The bottom level of the wash water control chamber must be above G.L so as to
dispose the wash water and sludge from Clariflocculator by gravity to disposal point.

Additional specificaions
12) Railing for all the components (Clarifloculator, Filter House, Staircase etc,.) shall be
provided with Stainless Steel of grade 304 for a height of 1.00m, with 40mm dia pipe
for top horizotals,25mm dia for middle row and 40mm dia verticals spaced at interval of
not more than 1.00m c/c.
13) Inspection / Path ways in filter beds : Middle pathway: Minimum of 1.50m,Side
pathway: Minimum of 1.20m.
14) Flooring in the buildings (Filter house, Chemical House, Chlorinator Room,
Laboratory) shall be provided with Non-skid tiles of approved make & quality , as per
standard specifications.
15) The basement of the Filtration plant building shall be minimum of 1.20m above the
existing nearby Road top level.
16) Minimum head room of 2.00m shall be provided , at the alum mixing chambers in
alum store for inspection & maintenance
17) The minimum width of entrance hall for the Filter House shall be 4.50m , and
Laboratory, of min size .of 3.30 X 4.50m .
18) High efficient Air Blowers shall be installed to the design requirement with low noise
pollution , environmental pollution as per PCB guide lines & Testing of blowers as per
I.S norms at site.
19) UPVC pipes shall be provided for water drain.Filter pipe manifolds shall be
assembled with HDPE pipes.
20) Alum storage capacity shall be designed for minimum period of 90 days.
Consumables shall be provided for 2115 Running Hours of WTP.
21) Chlorinator : Vaccum type chlorinator shall be provided with following
specifications:
a) Vaccum operated solution feeding type Vaccum Regulator, Rotometer, Rate setting
Valve, built-in NRV, Gas Overflow out let by manifolding to mount the system with the
unit.
b) The unit shall consists of Ejector with necessary accessories such as Check Valve,
Drain Valve and Vacum relief Valves - for control of chlorinator dosage.
c) The Accessories and manifolds shall be chlorine resistant and made of corbon steel
seam less pipes, copper tube with brass fittings of suitable size & dimensions, with
diaphram sealed chlorine pressure gauge arrangements

d) Water Boosted Pump of pumping capacity ranging from 2 cum/hr to 12


cum/hr, with Head ranging from 16 to 35 MWC
e) The water & solution carrying pipes shall be made of UPVC material of
suitable size incl.all specials such as Tee's , Bends, couplings & NRVs and
also Pressure Gauges of suitable range.
f) Chlorine Gas detector with alarm indicator.
The following are the specification for Gas Chlorination System for 13 MLD
STP Plant
1) Chlorinator and Chlorine gas line :
Chlorinator with flow indicator and flow control valve of Capacity : 2kg/hr
containing inbuilt accessories like Filter, Rotameter with Dose rate adjuster
etc, Test Pressure: 5 Bar
Material of Construction (MOC ): PVC/ VITON/ HASTELLOY C4/ NICKLE
PLATED BRASS , PVDF, BOROSILICATE GLASS, MONEL etc
2) Vacuum and Vent Rating
Rating – 10 Bar, Dia – 8/12 mm, MOC: PE Tubing
3) Gas Filter
Capacity : 10 KG/ HR , MOC (Body ) : Carbon Steel , MOC (Media ) : Glass
Wool + Monel Mesh , Connection : Flanged ASA 300

4) Power water line and its accessories:


- Power water line upto ejector flange with all accessories and fittings as per
P & I Diagram :
Booster Pumps (Centrifugal, Vertical type) , flow : 1.5 m^3 /hr , Head : 70
mtr, Motor Rating 1.1 KW , 2900 RPM
Isolation valve and Strainer on booster pump suction- Type : Sluice ,
Connection : Threaded , Size : 1” , MOC : Brass
Non Return valve & Isolation valve on booster pump discharge- Type: Wafer,
Connection: Threaded , Size : 1 ‘’ , MOC : Brass
P .G on pump discharge line with isolation valves : Range : 0 to 10 Bar ,
process connection : 0.5’’ BSP ( M) , Type : Bourden
5) Chlorine solution line:
- Ejector with built in check valve assembly: Type Fixed Throat , Model :
Type E , MOC : PVC, VITON , Connection 05 ‘’ Union PVC -Chlorine Solution line with
fitting from ejector delivery upto Dosing point:
MOC: PVC , MAKE : Dutron , dia : 15 mm , Rating : 10 Bar
- Diffuser for Dosing in Tanks : MOC – PVC , Length : 3 mtrs, Dia :15 mm,
Make : Toshcon Jesco

6) Empty Toners : Make : ISGEC , Design pressure : 20.63 Kgf/cm2 (g) ,


Design Temperature : 65 Deg C , Material of Construction : 516 Grade 60 ,
Longitudinal Shell Joint and Head to Shell joint : Fusion Welded ,
Radiography : 100 % , Hydraulic Test Pressure : 30 kgf/cm2 (g), Design
approval : Lloyd’s Register Asia , Tare weight : 620 kgs , Water Capacity
:780 kgs , Chlorine Capacity : 928 Kgs
7) Roller Support Assembly : MOC : MS Structure without Gun Metal
Bushings Duly Painted , Load Capacity : 2 Tons
8) Auxiliary Ton Container valves (yoke) with clamps : MOC : Al-Si_Bronze ,
Monel , PTFE etc, Rating : 35 Bar , Connection 5/8’’ BSP (M)
9) Valves and Accessories:
-Flexible connector with Isolation Valves : Length: 1.5 m, MOC : Copper ,
Brass , Connection : 5/8 BSP union(F), Pressure Rating : 15 Bar
- Header Line Isolation Valves: MOC: Al-Si-Bronze , Monel , Panel , PTFE
etc, Rating : 35 Bar, Connection : 5/8’’ BSP (M)
- Gas Filter inlet/outlet isolation valve: Size 0.75’’ , MOC: CF8M, Rating :18
Bar, End Connection : Flanged ASA 300
- Pressure Indicator Isolation valve : MOC : CF8M, Rating : 15 Bar,
Connection : 0.75 ‘’ BSP, Seal Material :PTFE
- Chlorine Solution Line Isolation Valve : MOC : PVC , Make : Dutron , Size :15 mm
-Diffuser Isolation Valve : MOC : PVC , PTFE , Make : Dutron , Size : 15mm

10) Instruments :
- Chlorine Leak Detector Double Alarm sensor with Audio alarm in Building
& Panel : Make : Toshcon Jesco , Alarm Pre Set Level : 2 PPM (low) , 5 PPM
(High) , Type : Electrochemical , Display : 7 Segment LED , Cabinet :
Polycarbonate , Transmission Output : 4-20 mA
11) Safety Equipments :
- Cannsiter Type Respirator with full face Coverage : Make : Grouptech ,
Accessories : Full Face Mask
-Ammonia Bottle with leak torch : Quantity : 500 ml , Make : Merck/Equ
- Gloves , Rubber Boots , apron , Google and Helmet : Size : Universal
- Emergency Eye wash shower and Basin : Make : J.K Enterprises, MOC: G.I
, ABS Plastic , Required Water Pressure : 1 Bar , Inlet Connection : 1.25 ‘’ - Self
Contained Breathing apparatus Complete with Warning Whistle ( Type
Full face) : Make : Group Tech , Accessories : Storage Bag, Carrying Harness
, Demand Valve type Full face mask , Warning Whistle , Duration : 30 mins
- Emergency Kit B : Make : J.K Enterprises , Type : B for Tonner

12) Chlorine Leak Absorption System :


- FRP Hood on Tonners : MOC : Isopthalic Resin , Type : Full , Colour :
Pigmented Yellow , Thickness : 4 mm
- ID Fan : MOC : FRP , Make : TCF NADI , Motor Rating : 2.2 kW, 2830
RPM, Head: 300 MMWC, Flow : 1000 m3/hr , MOC of Wetted parts : MS +
FRP lining , Inlet/Outlet Connection : Flanged
- Flex Hose from FRP Hood to ID suction : MOC : PVC, Dia : 4’’ , Rating :
10 Bar, Make : Dutron
- Flexi Hose from ID fan discharge to Chlorine Gas leak Absorption Pit :
MOC : PVC , Dia : 4’’ , Rating : 10 Bar, Make : Dutron
Additional Items :
1) Pressure Reducing Valve – MOC: Carbon Steel , Viton , PTFE , and
Hastelloy C4 etc , Up stream Pressure : 15 Bar , Down Stream Pressure : 2.5
Bar ( Adjustable ) , Connection : Flanged ASA 300
2) Control Panel for Chlorine Absorption system

i) 2 to 10 MLD Plants - 1 Kg /hr Chlorinator


for Post Chlorination
ii) 10 MLD to 20 MLD Plants - 2 Kg/hr Chlorinator
for Post Chlorination.
iii) 20 MLD to 50 MLD Plants - 5 Kg/hr Chlorinator
for Post Chlorination.
B) Mechanical Equipment
1) Alum dosing equipment with SS 304 material made stirrers & paddles for chemical
resistance. (Alam tanks must be bound with corrosion resistant material (HDPE Lining,
Bitumen Coating, tiles etc)
2) Flash mixer equipment with SS 304 material made stirrers & paddles for chemical
resistance.
3) Filtration plant euqipment instrumentation and piping.
4) Clarifloccualation equipment (with stainless steel blades) with rotating
bridge arrangement etc.,The equipment consists of following components
a) Flocculator Drive Mechanisms
These will consist of suitable H.P geared electric motor mounted on M S
Frame work on bridge platform.
b) Flocculating Mechanisms and raking in the flocculation compartment .
These will consist of vertical M S shafts and arms, wooden paddles, guides,
bearings etc with stainless steel bush bearing for the shafap at the bottom.
The paddle area shall be between 10 to 25 % of the cross section of
flocculating zone .
c) Mechanism for raking in clarifier compartment.
d) Revolving Bridge
This will be made of M S sections with torsion proof fabrication of required
length and width of 1.22 m. The scrapper frame work of M .S section shall be
hung from bottom of the bridge. The Bridge will have an outer travelling
trolley. The walk way will be 1.22 m wide and shall have chequered plates.
The web of the bridge structure shall perform the function of hand railing on
both the sides also. The scarping plates will be fitted with the scrapper frame
work with hinges and stainless steel pins and will be fitted 12 mm thick rubber
ledging . The scrapers will be so adjusted as to ensure smooth and even
scarping of the floor.
e) Bridge Drive
The Bridge will be driven by an electrically operated geared motor with
suitable H.P

f) Bridge Drive Mechanisms


This will consist of two nos of steel wheels driven by electric geared motor.
The wheels will be fitted on the trolly with necessary bearings, pedestals etc .
These wheels travel along the periphery of the clariflocculator tank on rails.
g) Electrical Arrangements
These will consist of electrical cables PVC insulated with copper wires run
from the main switch board provided in the chemical store and run under the
tank and along the central column. The cable will be connected to the central
slip arrangements. The electric geared motors will be controlled from the
control panel fitted on the bridge with necessary weather proof housing
cabinet with necessary cables, wires, starters , switches etc .

5) Stainless steel wheel shall be provided for the bridge clariflocculator


6) Wash water tank fittings and pumpsets with 100% stand by.
7) Air blower with motor 100% stand by and pipe connections.
Air Scouring type with twin lobe rotary having required capacity and pressure
as per hydraulic design having following components:
Blower, Base Frame for blower and motor, Foundation Bolts, Nuts and
Washers, Slide Rail and Motor Bolts, V Belts, Pulley, Guard, Suction
Silencer, Discharge Silencer, Safety Relief Valve and Non Return Valve ,
Companion Flange, Interconnection Pipe, Flexible Bellow, Safety Valve and
T Connection, First Fill of Lubricants, Anti vibration Pads, Acoustic
Enclosure and Motor : CGL/KEC/ABB make
A) Materials of Construction :
a) Housing : C.I IS 201 FG 260
b) Rotor Shaft : S G IRON
c) Shaft : EN 19 forged and heat treated
d) Timing Gears : Cast Alloy steel ( 20 microns) forged and heat treated .
e) Pulley , Gear side , plates and covers : C.I IS 210 FG 260
f) V Belts : Reinforced rubber
g) Base plate : MS Enamel Painted
h) Belt Guard : MS Enamel Painted
i) Fasteners : As per IS 1363/ IS 1367

8) Spares & Tools and the same shall be handed over after 2 years defect
liability period.
9) Gaseous Chlorination with cylinders has to provided with protection measures.
C) Electrical Equipment
1) Necessary power supply wiring to motors and switches bus bar connections
as per IE Rules
2) Internal wiring and illumination and fittings and fixtures for internal and
external lighting exhaust fans, ceiling fans etc.
3) Erecting mechanical and electrical equipment, trial run for 90 days 23.50
hours per day testing the treated water for efficient standards and maintenance
of records and imparting training to staff
4) Supply of 6 - Seap of completion plans and maintenance manual and
brochures.
5) All cables shall be with of copper material, Cable ducts shall be covered
with MS / Aluminum chequed plate
6) Yard lighting shall be provided at 6 locations with required fixtures
D ) Equipment for Flow measurements
1) Equipment for Flow of Conductivity, Turbidity, Ph value, Residual Chlorine with
recording & data storage facility (Computer based) & Alarm by SMS or other methods.

2) Off - Site Supervisory and Data Acquisition (OSSADA) system for Raw water &
Clear water flows by installing Digital Flow meters to measure the flows at Raw water
Channel and at each filter bed individually and combined for measuring the quantities
of water treated with a facility to record and store the readings & also to send
messages to the assigned designatories about the variations/ defficiencies in the flow
including alerts for back wash requirements of filter beds, and recovery of data for the
past 360 days. All the Digital Flow Meters & Pressure Gauges shall be provided of
standard approved make. The equipment shall have the following specifications, but
not limited to:

Hardware:
i) Wall mounted Sensor House for measuring Raw water & Clear water flow from Filter
bed out lets with accessories consists of
ii) Electrode Type: General type, Scraper type or replaceable type Electorde made with
material of SS external Ultra Touch Sensors as per requirement.
iii) Customised Application Requirement : Sensors with Interface logic control board
with serial interfaces, including accessories such as Add-on port, external DC Power
Socket, On - sensor Board Buffer, Timer, RS485 Communication, Analog to Digital
Sensing Sensor Circuit, 32 Sensors Sensing Tags, Interval Power Supply System ,
LCD 16c/2L, Filter Bed Working Status Indication LED, Filter Bed Wash Indication
Button and memory of Data Storage for 30Days , status of Filter Bed Level indicator,
Rating, Reading on LCB Display, Menu Driven Data for sending to Onsite Big Display,
operated with Battery Power of any reputed make or any equalent make.

iv) Customised Application Requirement: Power Sensors Interface logic control board
with support 8 Power Sensing tags, Central System Interfacing Communication, On -
board analog to Digit Convert Integrate Circuit of any reputed make or any equalent
make.
v) Customised Application Requirement: Centralized System with two serial interfaces,
3 Nos of Add-On ports, One external DC Power Socket, On - Board Buffer, On - Board
Timer, On - Board RS485 Communication, On - Board RS 232 Communication, On -
Board GPRS/GSM Module, On - Board Voice Chip, On - Board Power Sensing Module,
LCD 16c/2L, Filter Bed Wash Precaution Indication with Stop Button, Memory of Data
Storage for 30 Days, Total Bed Rating, Reading display on LCD Display, Menu Driven,
Menu Navigate Keypad, sendind data to the Web Server, Communication with GPRS ,
operated with Battery Power of any reputed make or any equalent make.

Software:
The software shall be designed with Web Domain with Data Base Server and Web
Name as per the directions of the Departmental Authorities
The application of Software for Web design & Desktop shall meet the following
requirements:
Onsite Display: Letters with size of 1.5’ seven Sigment LED Display with Interface for
each Filter Bed, for Onsite Display, by displaying the Bed Leves, Ratings, Readings in
3 Columns , for each bed of the plant in succesive rows and cumulative results at the
bottom of the screen.
Off Site Display: Letters with size of 1.5’ seven Sigment LED Display with Interface
GPRS/GSM Modules Offsite Display, with Display of Bed Total Rating, Total
Cumulative Reading as specified on On-site Display Features.
The system shall have also the features of Onsite Bed Wash Voice Precautions for
Bed Levels, Readings, Ratings, Bed Capacity Readings and Ratings and Bed Low
Level Triggering, before & after Bed wash.
The software shall also have the features of sending messages to the mobiles of the
Departmental designatories indicating Bed Low Levels,Power Supply timings, Bed
Wash timings and its status, Power Supply timings and its status Grid View Table,
Motor Working time and its status Grid View Table, all trigger events and schedule
information and including all Snap View Reports, all Daily, Monthly, Yearly Reports, all
Power Working Reports, all Power Events Information etc,.
JUNE 2018-19

Basic Rate Unit

R : 2018-19 GENERAL GUIDE LINES FOR REVISING RATES OF MATERIALS

ring freak rates, shall be the criteria for fixing

chips from excavation shall be at dump yard.

S. Rate for 2018-19 UNIT

325.00 1 cum
40.00 1 Kg
50.00 1 Kg
200.00 1 sqm
4750.00 1 tonne
4650.00 1 tonne
4500.00 1 tonne
53.00 1 Kg
760.00 1 cum
990.00 1 cum
890.00 1 cum
510.00 1 cum

42.00 1 Each
600.00 1 kg
20.00 1 Each
28.00 1 Each
119.00 1 ltr
8.00 1 Rm
17.00 1 Each
7.00 1 Rm
30.00 1 Rm
15.00 1 Each
8.00 1 Each
6.00 1 Each
5.00 1 Each
55.00 1 kg
70.00 1 kg
75.00 1 kg
1 cum
570.00

760.00 1 cum
34.00 1 sqm
42.00 1 sqm
51.00 1 sqm
675.00 1 Rm
80.00 1 Rm
128.00 1 Rm
211.00 1 Rm
245.00 1 Rm
422.00 1 Rm
84.00 1 kg
51000.00 1 tonne
54500.00 1 tonne
32.00 1 sqm
270.00 1 Each
72.00 1 kg
62000.00 1 cum
260.00 1 Rm
519.00 1 Rm
34.00 1 Each
26000.00 1 cum
13.00 1 Each
16.00 1 Each
18.00 1 Each
490.00 1 Each
84.00 1 sqm
118.00 1 sqm
160.00 1 sqm
70.00 1 kg
200.00 1 cum
85.00 1 ltr
40.00 1 cum
41.00 1 Rm
415.00 1 Rm
152.00 1 Rm
47000.00 1 tonne

38.00 1 Each
25.00 1 Each
1 sqm
200.00

1 sqm
150.00

1 cum
185.00
360.00 1 cum
1 tonne
43000.00

43000.00 1 tonne
55.00 1 kg
190.00 1 ltr
278.00 1 Kg
379.00 1 sqm
580.00 1 sqm
1 Each
23.00

1 Each
39.00

1 Each
59.00

1 cum
170.00

1 cum
340.00

79.00 1 kg
11.00 1 Each
35.00 1 Each
215.00 1 sqm
135.00 1 ltr
476.00 1 ltr
206.00 1 ltr
159.00 1 ltr
151.00 1 ltr
169.00 1 Rm
574.00 1 Rm
155.00 1 Kg
401.00 1 Ltr
206.00 1 Ltr
38.00 1 cum
1 cum
500.00

550.00 1 cum

6.00 1 Rmt

1 Bag
30.00

1 cum
200.00

3.00 1 sqm

71.00 1 Liter
200.00 1 cum
1 cum
65.00
R GATES & HOISTS FOR THE YEAR : 2018-19
S. Rate for 2018-19 UNIT

211.00 1 kg
363.00 1 kg
105.00 1 kg
312.00 1 kg
844.00 1 kg
844.00 1 kg
72.00 1 kg
207.00 1 kg
194.00 1 kg
156.00 1 kg
135.00 1 ltr
211.00 1 ltr
224.00 1 kg
148.00 1 kg
169.00 1 Rm
139.00 1 Rm
658.00 1 Rm
793.00 1 Rm
1266.00 1 Rm
1941.00
1097.00 1 Rm
1688.00
1603.00 1 Rm
2700.00 1 Rm
3544.00
2532.00 1 Rm
3376.00
253.00 1 kg
1 Each
17.00

23.00 1 Each
203.00 1 kg
167.00 1 kg
587.00 1 ltr

For 1 Each
establishing 1 Each
Electrical sub
stations at the 1 Each
projects sites 1 Each
wherever
necessary, the 1 Each
rates approved 1 Set
by
1 1000
APTRANSCO
may be 1mRm
followed.
rates approved
by
APTRANSCO
may be
followed. 1 Rm
1 Rm
1 Rm

MACHINERY / EQUIPMENT FOR THE YEAR: 2016-17


CAPITAL COST OF MACHINERY / EQUIPMENT

2200000.00 1 Each
90000.00 1 Each
710000.00 1 Each
950000.00 1 Each
865000.00 1 Each
1085000.00 1 Each
1120000.00 1 Each
1370000.00 1 Each
5475000.00 1 Each
1200000.00 1 Each
4245000.00 1 Each
5425000.00 1 Each
530000.00 1 Each
30000.00 1 Each
56000.00 1 Each
15500.00 1 Each
150000.00 1 Each
145000.00 1 Each
260000.00 1 Each
255000.00 1 Each
2361000.00 1 Each
3855000.00 1 Each
90000.00 1 Each
1150000.00 1 Each
522000.00 1 Each
744000.00 1 Each
2120000.00 1 Each
34000.00 1 Each
24500.00 1 Each
60000.00 1 Each
55000.00 1 Each
190000.00 1 Each
100000.00 1 Each
1100000.00 1 Each
1350000.00 1 Each
90000.00 1 Each
1500000.00 1 Each
90000.00 1 Each
500000.00 1 Each
150000.00 1 Each
280000.00 1 Each
2280000.00 1 Each
70000.00 1 Each
14500.00 1 Each
13500.00 1 Each
16500.00 1 Each
15500.00 1 Each
780000.00 1 Each
450000.00 1 Each
590000.00 1 Each
85000.00 1 Each
17500.00 1 Each
52000.00 1 Each
925000.00 1 Each
3750000.00 1 Each
6380000.00 1 Each
653000.00 1 Each
1645000.00 1 Each
90000.00 1 Each
260000.00 1 Each
7650000.00 1 Each
450000.00 1 Each
1475000.00 1 Each
90000.00 1 Each
2240000.00 1 Each
90000.00 1 Each
56000.00 1 Each
260000.00 1 Each
2950000.00 1 Each
650000.00 1 Each
1440000.00 1 Each
90000.00 1 Each
48000.00 1 Each
375000.00 1 Each
14300000.00 1 Each
190000.00 1 Each
10200000.00 1 Each
190000.00 1 Each
490000.00 1 Each

NERY / EQUIPMENT FOR THE YEAR : 2018-19


S. Rate for 2018-19 UNIT

8861.00 1 Each
9283.00 1 Each
10970.00 1 Each
11814.00 1 Each
2110.00 1 Rm
4641.00 1 Each
5823.00 1 Each
675.00 1 Each
24051.00 1 Each
47257.00 1 tonne
5063.00 1 Each
4219.00 1 Each
10127.00 1 Each
11814.00 1 Each
15190.00 1 Set
224.00 1 Rm

MACHINERY / EQUIPMENT FOR THE YEAR : 2018-19


S. Rate for 2018-19 UNIT

155.00 1 Rm
217.00 1 Rm
370.00 1 KVA /
72.17 1 month
ltr
10.00 1 Kwhr
0.00 %
0.00 %/
annum
%/
0.90
230.00 1 annum
ltr
79.43 1 ltr
84.00 1 kg
As per RTA 1 annum
94.00 1 kg
30.00 1 ltr
23.00 1 kg
20.00 LS
143.00 1 Rm
16.00 LS
17.00 LS
17.00 LS
17.00 LS
17.00 LS
17.00 LS
14250.00 1 Each
232.00 1 Kg
7800.00 1 Each
150.00 LS
ES AND HOISTS FOR THE YEAR : 2018-19

S. Rate for 2018-19 UNIT

192000.00 1 Each
104000.00 1 Each
73000.00 1 Each
62000.00 1 Each
29000.00 1 Each
20000.00 1 Each
10500.00 1 Each
170.00 1 Kg
27000.00 1 Each
200000.00 1 Each
32500.00 1 Each
56000.00 LS
4620.00 1 Each

Basic Rate Unit

2018-19

152.00 1 Cum
152.00 1 Cum
156.00 1 Cum
129.00 1 Cum
179.00 1 Cum
112.00 1 Cum
131.00 1 Cum
146.00 1 Cum
148.00 1 Cum

129.00 1 Cum
241.00 1 Cum
1 Cum
1 Cum
67.00

249.00 1 Cum
179.00 1 Cum
1 Cum
1642.00
1 Cum
67.00

29.00 1 each
35.00 1 each
Based on detailed
analysis as per
MoRTH Data

67.00 1 each
97.00 1 each
67.00 1 each
8.00 1 each
9.00 1 each
505.00 1 Cum
657.00 1 Cum
781.00 1 Cum
870.00 1 Cum
830.00 1 Cum
505.00 1 Cum
433.00 1 Cum
398.00 1 Cum
360.00 1 Cum
289.00 1 Cum
236.00 1 Cum
1 Cum
67.00
1 Cum
25%
1 Cum
9.90
1 Cum
17.00

117.00 1 Cum
105.00 1 Cum
83.00 1 Cum
74.00 1 Cum
69.00 1 Cum

485.00 1 Cum
485.00 1 Cum
620.00 1 Cum
700.00 1 Cum
821.00 1 Cum
790.00 1 Cum
520.00 1 Cum
440.00 1 Cum
400.00 1 Cum
360.00 1 Cum
290.00 1 Cum
1 Cum
67.00
1 Cum
25%
1 Cum
9.90
1 Cum

17.00

367.00 1 Cum
367.00 1 Cum
344.00 1 Cum
344.00 1 Cum
278.00 1 Cum
278.00 1 Cum
273.00 1 Cum
162.00 1 Cum
162.00 1 Cum
143.00 1 Cum
143.00 1 Cum
135.00 1 Cum
135.00 1 Cum
111.00 1 Cum
111.00 1 Cum
87.00 1 Cum
87.00 1 Cum

96.00 1 Cum
71.00 1 Cum
90.00 1 Cum
1 Cum

67.00

63.00 1 Cum
39.00 1 Cum
52.00 1 Cum
40.00 1 Cum
46.00 1 Cum
40.00 1 Cum
34.00 1 Cum
30.00 1 Cum
1 Cum
16.00

1 Cum
98.00 1 Cum
77.00 1 Cum
485.00 1 Cum
760.00 1 Cum
570.00 1 Cum
570.00 1 Cum
1 Cum
33.00

As per Local prevailing rates based


on competitive rates
The monthly rates will be communicated
by Govt.

Based on detailed
analysis as per data

89.00 1 Cum
893.00 1 Cum
1 Kg

Rates have to be worked out based


on MORT&H data.

1 MT The monthly rates will


1 MT be communicated by
Govt.
1 MT
1 MT
1 MT
rates applicable to the District. 3) Least of the (1) and
and fixed on monthly basis and rates will be communicated

detailed 1 Sqm
analysis as 1 Sqm
per 1 Sqm
1 Sqm
3.50
18.00 1 Each
42.00 1 Each
44.00 1 Each
46.00 1 Each
23.00 1 Each
33.00 1 Each
1 Each
23.00
29.00 1 Each
29.00 1 Each
44.00 1 Each
71.00 1 Each
1 Each
23.00
31.00 1 Each
39.00 1 Each
2.00 1 Sqm
2.90 1 Sqm
1 Sqm
3.30
1 Sqm
1.80

3.60 1 Sqm
3.10 1 Sqm
3.40 1 Sqm
3.50 1 Sqm
4.80 1 Sqm
1 Sqm
1.30

59.00 1 Cum

as per MoRTH

118.00 1 Rmt
124.00 1 Rmt
143.00 1 Rmt

133.00 1 Rmt
144.00 1 Rmt
157.00 1 Rmt

84.00 1 Rmt
105.00 1 Rmt
131.00 1 Rmt
61.00 1 Kg
8.30 1 Rmt
10.00 1 Rmt
66.00 1 Liter
17.00 1 Sqm
73.00 1 Kl
98.00 1 Kl

ms 2018-2019
Unit

As per Labour 1 Day


rates of SOR 1 Day
1 Day
1 Day
1 Day
1 Day
1 Day
1 Day
1 Day
1 Day
To follow the
relevant items
of Irrigation
work items as
per Standard
data

To follow the
relevant items
of Irrigation
work items as
per Standard
data

To follow as per 1 Tonne


Standard data 1 Tonne
1 Tonne
1 Tonne

To follow as per 1 Tonne


Standard data 1 Tonne
1 Tonne

To follow as per 1 Tonne


Standard data 1 Tonne
1 Tonne

To follow as per 1 Tonne


Standard data 1 Tonne
To follow as per
Standard data 1 Rmt

To follow as per
Standard data

585.00 1 Rmt
759.00 1 Rmt
987.00 1 Rmt
1216.00 1 Rmt
1446.00 1 Rmt

To follow as per
Standard data

13178.00 1 Joint
14758.00 1 Joint
16315.00 1 Joint
17851.00 1 Joint

To follow as per
Standard data 1 Joint

To follow as per
Standard data 1 Joint
5645.00 1 Joint
6698.00 1 Joint
7754.00 1 Joint
8834.00 1 Joint
9945.00 1 Joint

23.00 1 Rmt
To follow as per 1 Rmt
Standard data

372.00 1 Rmt
446.00 1 Rmt
534.00 1 Rmt
639.00 1 Rmt

To follow as per
Standard data 1 Rmt

36.00 1 Rmt
37.00 1 Rmt
42.00 1 Rmt
42.00 1 Rmt
42.00 1 Rmt

To follow as per
Standard data 1 Rmt

To follow as per
Standard data 1 Rmt

39.00 1 Rmt
43.00 1 Rmt
48.00 1 Rmt
59.00 1 Rmt
70.00 1 Rmt
74.00 1 Rmt
80.00 1 Rmt
88.00 1 Rmt
96.00 1 Rmt
106.00 1 Rmt
112.00 1 Rmt
124.00 1 Rmt
192.00 1 Rmt
214.00 1 Rmt
238.00 1 Rmt
265.00 1 Rmt

To follow as per
Standard data 1 Each

To follow as per 1 Each


Standard data 1 Each
200.00 1 Each
214.00 1 Each

267.00 1 Each
311.00 1 Each
462.00 1 Each
506.00 1 Each
550.00 1 Each

To follow as per 1 Rmt


Standard data 1 Rmt

To follow as per
Standard data

To follow as per 1 Rmt


Standard data
To follow as per 1 No
Standard data
576.00 1 No
621.00 1 No
660.00 1 No
741.00 1 No
824.00 1 No
909.00 1 No
991.00 1 No

35.00 1 No
35.00 1 No
35.00 1 No
35.00 1 No
37.00 1 No
59.00 1 No
59.00 1 No
74.00 1 No
81.00 1 No
102.00 1 No
113.00 1 No
124.00 1 No

To follow as per 1 No
Standard data 1 No

1042.00 1 Cum

2169.00 1 Cum
267.00 1 Cum

57.00 1 HP/ho
ur

42.00 1 HP/ho
ur

To follow as per 1 Sqm


Standard data

To follow as per 1 Rmt


Standard data
12868.00 10 Cum
18431.00 10 Cum
27664.00 10 Cum
5286.00 10 Cum

46.00 1 Rmt

One Sqm of Centering area

3953.00 1 Sqm
473.00 1 Sqm
2986.00 1 Sqm
2659.00 1 Sqm
1628.00 1 Sqm
3238.00
893.00 1 Sqm
1332.00 1 Sqm
1463.00 1 Sqm
4141.00
525.00 1 Sqm

To follow as per 1 Sqm


Standard data 1 Sqm
1 Sqm
1063.00 1 Sqm of centering
area
1352.00
1488.00

162.00 1 Cum

49.00 1 Cum

To follow as per 1 Each


Standard data
Relevant 1 Each
Building SOR
items. 1 Each

1 Each

1 Each
10 Cum

50% extra over 1 Each


the cost of
chamber.
150% extra
over the cost of
work

317.00 1 Cum

To follow as per 1 Rmt


Standard data 1 Rmt
1 Rmt
1 Rmt
1 Rmt

Observed Data

17.50 1 litre
14.23 1 litre
13.14 1 litre
12.42 1 litre
11.77 1 litre
5500
81.17 1 litre
0.00 1 litre
48.27 1 litre
38.36 1 litre
28.51 1 litre
25.20 1 litre
22.02 1 litre
20.02 1 litre
18.88 1 litre
18.30 1 litre
17.72 1 litre
15.49 1 litre
13.80 1 litre
4.81 1 litre
3.85 1 litre
3.30 1 litre
2.82 1 litre
2.49 1 litre
//
ATTESTE
D //
Page 941 of 2191

LABOUR RATES (2018-19) - IRRIGATION

Basic Rate of
Labour wide MA on LC @ Total
SNo. CATEGORY OF WORKER Pg.

5 to 9 20%
I. SKILLED CATEGORY:
1 Bar bender 565.00 113.00 678.00
2 Black smith / Tin smith / Rivetor 470.00 94.00 564.00
3 Blaster 565.00 113.00 678.00
4 Carpenter Cl- I 565.00 113.00 678.00
5 Electrician ( Licensed ) 540.00 108.00 648.00
6 Fitter Cl- I 540.00 108.00 648.00
7 Floor Polisher / Tile Layer 470.00 94.00 564.00
8 Foreman 540.00 108.00 648.00
9 Gauge reader 470.00 94.00 564.00
10 Maistry / Work Inspector with Non-technical Qualification 113.00 678.00
565.00
SSLC/SSC/HSC
11 Mason Cl- I / Brick layer Cl- I 470.00 94.00 564.00
12 Mechanic Cl- I 500.00 100.00 600.00
13 Operator Air compressor / DG set 500.00 100.00 600.00
14 Operator Batching plant 540.00 108.00 648.00
15 Operator Bus/Ambulance/ Lorry/ Tanker 540.00 108.00 648.00
16 Operator Concrete / Asphalt mixer 500.00 100.00 600.00
17 Operator Concrete / Asphalt paver 500.00 100.00 600.00
18 Operator Concrete pump / Placer/ ice plant 500.00 100.00 600.00
19 Operator Core drilling machine 540.00 108.00 648.00
20 Operator Crane/ Tower crane/ Cable way 540.00 108.00 648.00
21 Operator Drilling jumbo / Loco / Winch 500.00 100.00 600.00
22 Operator Grouting/ Guniting/ Shotcreting 500.00 100.00 600.00
23 Operator Jackhammer/Pneumatic tamper 500.00 100.00 600.00
24 Operator Pump / Ventilation fan 500.00 100.00 600.00
25 Operator Lathe/Drilling/Shearing machine 540.00 108.00 648.00
26 Operator Bending / Planing machine 500.00 100.00 600.00
27 Operator Road roller 540.00 108.00 648.00
28 Operator Shovel / Scraper / Dozer 540.00 108.00 648.00
29 Operator Spillway / Sluice gate 500.00 100.00 600.00
30 Operator Crusher / Conveyor / Mucker 500.00 100.00 600.00
31 Operator Tipper / Dumper / Transit mixer 540.00 108.00 648.00
32 Operator Concrete vibrator 500.00 100.00 600.00
33 Operator Vibratory plain / pad foot roller 500.00 100.00 600.00
34 Operator Wagon drill / Drifter 540.00 108.00 648.00
35 Painter Cl- I 540.00 108.00 648.00
36 Plumber / Pipe fitter 540.00 108.00 648.00
37 Sarang / Khalasi 500.00 100.00 600.00
38 Spun pipe moulder 500.00 100.00 600.00
39 Stone chiseller CI- I / Stone cutter Cl- l 500.00 100.00 600.00
40 Struct. steel Fabricator / Marker / Erector 580.00 116.00 696.00
41 Welder / Gas Cutter 500.00 100.00 600.00
42 Welder (X-ray quality) 540.00 108.00 648.00

labour & Hire-18-19


Page 942 of 2191

43 Caulker 540.00 108.00 648.00


44 Bore Mechanic 540.00 108.00 648.00
45 Plumber Class-I 540.00 108.00 648.00
II. SEMI SKILLED CATEGORY:
1 Asphalt Sprayer / Boiler attendant 450.00 90.00 540.00
2 Bhisti 450.00 90.00 540.00
3 Boatman with boat 450.00 90.00 540.00
4 Carpenter Cl- II / Erector shuttering 450.00 90.00 540.00
5 Cartman with double bullock cart 500.00 100.00 600.00
6 Cartman with single bullock cart 450.00 90.00 540.00
7 Chavali / Navagani 450.00 90.00 540.00
8 Crowbarman / Jumper man 450.00 90.00 540.00
9 Fitter Cl- II 450.00 90.00 540.00
10 Gang man / Head / Survey mazdoor 450.00 90.00 540.00
11 Gardener / Trained mali 450.00 90.00 540.00
12 Helper Air compressor / DG set 450.00 90.00 540.00
13 Helper Batching plant 450.00 90.00 540.00
14 Helper Blasting 450.00 90.00 540.00
15 Helper Bus/ Ambulance/ Lorry/ Tanker 450.00 90.00 540.00
16 Helper Bending/Shearing/Planing machine 450.00 90.00 540.00
17 Helper Carpenter 450.00 90.00 540.00
18 Helper Concrete / Asphalt mixer 450.00 90.00 540.00
19 Helper Concrete / Asphalt paver 450.00 90.00 540.00
20 Helper Core drilling machine 450.00 90.00 540.00
21 Helper Crane/ Tower crane/ Cable way 450.00 90.00 540.00
22 Helper Drilling jumbo / Loco / Winch 450.00 90.00 540.00
23 Helper Fitter / Fabrication/Electrician 450.00 90.00 540.00
24 Helper Grouting/ Guniting/ Shotcreting 450.00 90.00 540.00
25 Helper Jack hammer / Pneumatic tamper 450.00 90.00 540.00
26 Helper Laboratory / Instrumentation 450.00 90.00 540.00
27 Helper Road roller 450.00 90.00 540.00
28 Helper Shovel / Scraper / Dozer 450.00 90.00 540.00
29 Helper Crusher / Conveyor / Mucker 450.00 90.00 540.00
30 Helper Tipper / Dumper/ Transit mixer 450.00 90.00 540.00
31 Helper Vibrator 450.00 90.00 540.00
32 Helper Vibratory plain/ pad foot roller 450.00 90.00 540.00
33 Helper Wagon drill/ Drifter 450.00 90.00 540.00
34 Lineman Electric / Telephone 450.00 90.00 540.00
35 Mason Cl- ll / Brick layer Cl-II 450.00 90.00 540.00
36 Mechanic Cl- II 450.00 90.00 540.00
37 Painter Cl- II 450.00 90.00 540.00
38 Patkari / Neeraganti / Sowdy 450.00 90.00 540.00
39 Stone Chiseller Cl- II 450.00 90.00 540.00
40 Stone breaker / Hammer man 450.00 90.00 540.00
41 Valve man / Canal sluice operator 450.00 90.00 540.00
42 Plumber Class-II 450.00 90.00 540.00
43 Sewer Cleaner 450.00 90.00 540.00
III. UN-SKILLED CATEGORY:
1 Cement / Asphalt handling mazdoor 425.00 85.00 510.00

labour & Hire-18-19


Page 943 of 2191

2 Civic worker 425.00 85.00 510.00


3 Man mazdoor 425.00 85.00 510.00
4 Woman mazdoor 425.00 85.00 510.00
5 Watchman 425.00 85.00 510.00
IV. OTHER CATEGORY:
1 Care-taker / conductor / Lift Attender 450.00 90.00 540.00
2 Cook / Mess man 450.00 90.00 540.00
3 Dhobi 450.00 90.00 540.00
4 Diploma Engineer / Surveyor 750.00 150.00 900.00
5 Diver with headgear 540.00 108.00 648.00
6 Graduate / Laboratory Assistant 560.00 112.00 672.00
7 Graduate Engineer/ Geologist 960.00 192.00 1152.00
8 Horticulture Assistant / Photographer 500.00 100.00 600.00
9 ITI certificate holder / Tracer / Printer 575.00 115.00 690.00
10 Literate mazdoor 425.00 85.00 510.00
11 Stenographer / Computer Operator 600.00 120.00 720.00
12 Telephone / Wireless Operator 550.00 110.00 660.00
13 Typist / Job Typist 550.00 110.00 660.00
14 CAD operator with Diploma in Engineering / General 150.00 900.00
degree with CAD certificate 750.00

15 Jeep Driver 525.00 105.00 630.00


16 Data Processing Operator 700.00 140.00 840.00

Labour Rates - R & B SSR -2017-18

(A) SKILLED WORKMEN


First Class
1 Mason and stone Cutter 500.00 100.00 600.00
2 Brick Layer 470.00 94.00 564.00
3 Carpenter 565.00 113.00 678.00
4 Painter 540.00 108.00 648.00
5 Plumber 540.00 108.00 648.00
6 Welder 500.00 100.00 600.00
7 Fitter 540.00 108.00 648.00
8 Electrician( Licensed) 540.00 108.00 648.00
9 Cook 450.00 90.00 540.00
10 Mechanic 500.00 100.00 600.00
11 Well Sinker 565.00 113.00 678.00
12 Blaster 565.00 113.00 678.00
13 Barbender 565.00 113.00 678.00
14 Tipper and Heavy Vehicle Driver above 12 T 540.00 108.00 648.00
15 Road Roller Driver (7.5 T to 12 T) 540.00 108.00 648.00
Operator
16 Concrete Mixer 500.00 100.00 600.00
17 Vibrator 500.00 100.00 600.00
18 Jack Hammer 500.00 100.00 600.00
19 Driller 540.00 108.00 648.00
20 Pump operator 500.00 100.00 600.00
21 Wireless Operator 550.00 110.00 660.00
22 Jeep Driver 525.00 105.00 630.00
23 Work Inspector with I.T.I qualification 575.00 115.00 690.00

labour & Hire-18-19


Page 944 of 2191

24 Work Inspector with LCE, LME,L.E.E qualification 750.00 150.00 900.00


25 Work Inspector with B.E (Civil Mechanical and 960.00 192.00 1152.00
Electrical qualification
26 Work Inspector with Non- technical qualification SSLC / 113.00 678.00
565.00
SSC /HSC
27 Typist/Job Typist 550.00 110.00 660.00
28 Computer operator 600.00 120.00 720.00
29 "CAD Operator with Diploma in Engineering /General 750.00 150.00 900.00
degree with CAD certificate" (B) SEMI-SKILLED WORKMEN
SECOND CLASS
44 Mason 450.00 90.00 540.00
45 Brick Layer and Stone Cutter 450.00 90.00 540.00
46 Carpenter 450.00 90.00 540.00
47 Painter 450.00 90.00 540.00
56 Telephone Operator 550.00 110.00 660.00
57 Hammer Man 450.00 90.00 540.00
61 Stone Packer 480.00 96.00 576.00
72 Head mazdoor(Mukaddar) 450.00 90.00 540.00
(C) UNSKILLED WORKMEN

73 Man mazdoor 425.00 85.00 510.00


74 Watch man 425.00 85.00 510.00
75 Woman Mazdoor 425.00 85.00 510.00
77 NOTE: Whenever unskilled workmen are engaged for cleaning of Sewers & Septic Tanks, they may be
paid double of the above wages.
(D) OTHER CONVEYANCE ITEMS
78 Single bullock with driver and cart 450.00 90.00 540.00
79 Bullock pair with driver 0.00 0.00 0.00
80 Bullock pair with driver and cart 500.00 100.00 600.00
82 Nava with crew 450.00 90.00 540.00
Note: -
1) The wage should not be less than the minimum wages of schedule of employment, subject to out turn.
2) 25% extra over the corresponding labour rates in respect of the work to be done during night time
subject to issue of certificate accordingly by the concerned estimate sanctioning authority for providing in
the data and by concerned Executive Engineer in charge of the work for payment. The night time
allowance is applicable only to the works done under Greater Hyderabad Municipal Corporation, Greater
Visakhapatnam municipal corporation and Vijayawada municipal corporation limits only.

HIRE CHARGES OF PLANT & MACHINERY( IRRIGATION ) FOR THE YEAR : 2017-18
S.No Description of machinery Unit Hire charge in Fuel charge
Rs in Rs

1 2 3 4 5
1 Agitator car / Transit mixer 2 cum Hour 739.60 1091.60
2 Air compressor 5 cmm ( electric ) Hour 101.00 302.10
3 Air compressor 7 cmm ( diesel ) Hour 228.50 893.10
4 Air compressor 7 cmm ( electric ) Hour 123.00 402.80
5 Air compressor 8.5 cmm ( diesel) Hour 260.90 1116.40

labour & Hire-18-19


Page 945 of 2191

6 Air compressor 8.5 cmm ( electric) Hour 159.30 503.60


7 Air compressor 15 cmm ( electric) Hour 124.40 1119.00
8 Angle Dozer 90 hp Hour 1640.20 763.60
9 Batching plant 0.5 cum ( 6 Cum/hr) Hour 103.20 134.30
10 Batching plant 2 x 1.00 cum ( 15 Cum/hr) Hour 365.10 402.80
11 Batching plant 2 x 1.50 cum( 50 Cum/hr) Hour 466.60 492.40
12 Bending machine 3000 x 12 mm Hour 38.30 134.30
13 Clamp shell and hoisting ropes Hour 5.40 0.00
14 Concrete bucket 1.5 cum Hour 15.20 0.00
15 Concrete hand mixer 45 / 30 ltr Hour 5.30 0.00
16 Concrete mixer 300 / 200 ( diesel) Hour 51.30 99.20
17 Concrete mixer 300 / 200 ltr( electric) Hour 49.50 44.80
18 Concrete mixer 600 / 400 ( diesel) Hour 88.80 198.50
19 Concrete mixer 600 / 400 ltr ( electric) Hour 87.10 89.50
20 Concrete paver 100 sqm / hr Hour 326.40 0.00
21 Convey mucker Hour 783.50 311.50
22 Core drilling machine Hour 314.10 297.70
23 Diesel generating set 30 KVA Hour 65.10 793.90
24 Diesel generating set 50 KVA Hour 92.80 1190.80
25 Diesel Loco 45 hp Hour 359.70 669.80
26 Dewatering pump 5 hp ( diesel ) Hour 8.20 99.20
27 Dewatering pump 5 hp ( electric ) Hour 2.80 44.80
28 Dewatering pump 10 hp ( diesel ) Hour 14.40 198.50
29 Dewatering pump 10 hp ( electric Hour 6.20 89.50
30 Dewatering pump 20 hp ( diesel ) Hour 45.70 396.90
31 Dewatering pump 20 hp ( electric Hour 11.30 179.00
32 Drifter Hour 312.80 0.00
33 Drilling jumbo Hour 365.50 53.60
34 Dumper 4.5 cum Hour 579.40 500.10
35 Geophysical Electric resistivity meter Hour 99.80 0.00
36 Grouting pump Hour 34.10 44.80
37 Guniting / sand blast equipment Hour 105.90 0.00
38 Ice plant & accessories 30 t / day Hour 152.20 1275.70
39 Jack hammer Hour 19.90 0.00
40 Needle vibrator 40 mm ( petrol ) Hour 5.40 21.80
41 Needle vibrator 40 mm ( electric ) Hour 5.00 9.00
42 Needle vibrator 60 mm ( petrol ) Hour 6.10 32.80
43 Needle vibrator 60 mm ( electric ) Hour 5.70 13.40
44 Planing machine 4 m stroke Hour 107.80 134.30
45 Plate shearing machine up to 12 mm Hour 40.80 179.00
46 Pneumatic placer 0.5 cum Hour 167.40 0.00
47 Pneumatic tamper Hour 19.30 0.00
48 Pug cutting machine Hour 6.70 4.50

labour & Hire-18-19


Page 946 of 2191

49 Pusher leg Hour 11.80 0.00


50 Road roller diesel 10 t Hour 202.10 893.10
51 Shovel 0.50 cum 75 hp Hour 951.60 595.40
52 Shovel 0.85 cum 110 hp Hour 1618.90 1091.60
53 Stationery derrick crane Hour 79.40 0.00
54 Tipper 5 cum Hour 436.20 375.10
55 Tipping tub 1.5 cum Hour 66.60 0.00
56 Tower crane 5 tonne Hour 807.10 232.80
57 Transformer 250 KVA Hour 4737.50 0.00
58 Truck 10 t Hour 401.00 375.10
59 Truck mounted derrick crane 5 t Hour 559.70 375.10
60 Upright drilling machine/grinder Hour 21.30 44.80
61 Ventilation fan 20 hp Hour 10.60 179.00
62 Vibratory pad foot roller 8 t Hour 1292.50 1290.00
63 Wagon drill Hour 177.50 0.00
64 Water tanker 8000 ltr Hour 393.70 375.10
65 Welding set Hour 15.00 107.40
66 Winch 35 hp ( electric ) Hour 123.00 219.30
67 Tractor with 2 T roller Hour
68 Hydraulic Truck Crane 30T Hour 2874.40 118.80
69 Hydraulic Truck Crane 16T Hour 2107.70 75.00
70 Heavy Duty Airless Spray Painting Equipment Hour 118.70

HIRE CHARGES OF PLANT& MACHNIERY FOR ROAD & BRIDGE WORKS FOR THE YEAR 2017

Sl. No. Description


Machine Activity
1 2 3
1 Dozer( D 80 ) Spreading, Cutting, Clearing
2 Dozer( D 50 ) Spreading, Cutting, Clearing
3 Mortor Grader Spreading, Cutting, Clearing
4 Hydraulic Excavator Soil Ordinary, Soil Marshy, Soil unsuitable
5 Front end loader Soil loading, Aggregate loading
6 Tipper- 5.5 Cum Transportation of soil, GSB,WMM, Hot mix etc

7 Vibratory roller 8 tonne


8 Smooth wheeled roller 8 tonne Soil compaction ,BM compaction
9 Water tanker 8 Kilolitre Water transport
10 Water tanker 6 Kilolitre Water transport
11 Tractor Pulling
12 Tractor with rotavator/Grader Scarifying
13 Tractor with ripper attachment Scarifying
14 Air Compressor General purpose
15 Wet mix plant 60 TPH Wet mix
16 Mechanical broom Hydraulic Surface cleaning

labour & Hire-18-19


Page 947 of 2191

17 Bitumen Pressure Distributor Applying bitumen tack coat


18 Emulsion Pressure Distributor Applying emulsion tack coat
19 Hot mix Plant – 120 TPH capacity DBM/BM/SDC/Premix
20 Hot mix Plant – 100 TPH capacity DBM/BM/SDC/Premix
21 Hot mix Plant – 60 TPH capacity DBM/BM/SDC/Premix
22 Hot mix Plant – 40 to 60 TPH capacity DBM/BM/SDC/Premix
23 Paver Finisher Hydrostatic with sensor control 100 TPH DBM/BM/SDC/Premix
24 Paver finisher Mechanical 100 Paving of WMM, paving of DLC
25 Hydraulic Chip Spreader Surface dressing
26 Tandem Road roller Rolling of Asphaltic surface
27 Pneumatic Road roller Rolling of Asphaltic surface
28 Pot-Hole repair machine Repair of pot-holes
29 Bitumen boiler oil fired Bitumen Spraying
30 GSB Plant 50 Cum Producing GSB
31 Mastic Cooker Mastic wearing coat
32 Batching and Mixing Plant (a) 30 Cum capacity Concrete mixing
(b) 15 -20 Cum capacity Concrete mixing
33 Transit mixer Transportation of concrete mix
34 Concrete pump of 45 and 30 cum Pumping of Concrete
35 Cranes
(a) 80 tonnes Lifting purpose
(b) 35 tonnes Lifting purpose
(c) 3 tonnes Lifting purpose
(d) Crane with grab bucket 0.75 cum Well foundation
(e) Crane with grab bucket 1 cum Well foundation
36 Concrete bucket For pouring concrete
37 Kerb casting machine Kerb making
38 Concrete mixer / Mix all
(a)0.28 cum Concrete mixing
(b) 1.0 cum Concrete mixing
39 Piling rig with bantonite pump 0.75 m dia to 1.20 m dia boring attachment
40 Concrete paver finisher with 40 HP motor Paving of concrete surface
41 Integrated stone crusher Crushing of spalls 100 TPH
Crushing of spalls 200 TPH
42 Pre stressing jack with pump and access Stressing of steel wires/ stands
43 Generator
250 KVA Generation of electric energy
125 KVA Generation of electric energy
100 KVA Generation of electric energy
30 KVA Generation of electric energy
44 Pneumatic sinking of Plants Pneumatic sinking of wells
45 Truck 5.5 cum per 10 tonnes Material transport
46 Road marking machine Road marking
47 Mobile slurry seal equipment Mixing and laying slurry seal
48 Plate compacter For compacting in medians
49 Drilling equipment For drilling

labour & Hire-18-19


Page 948 of 2191

Note: The above hire charges of machinery & plant includes crew, oils, conveyance of machinery to site and all oth
charges.

labour & Hire-18-19


Page 949 of 2191

new

labour & Hire-18-19


Page 950 of 2191

direct rate

EAR : 2017-18
Crew Total in Rs
Charge in
Rs.
6 7
308.90 2140.10
185.30 588.40
237.10 1358.70
185.30 711.10
237.10 1614.40

labour & Hire-18-19


Page 951 of 2191

185.30 848.20
197.60 1441.00
257.40 2661.20
370.60 608.10
370.60 1138.50
370.60 1329.60
148.20 320.80
0.00 5.40
0.00 15.20
0.00 5.30
247.00 397.50
247.00 341.30
247.00 534.30
247.00 423.60
474.20 800.60
197.60 1292.60
308.90 920.70
148.20 1007.20
148.20 1431.80
185.30 1214.80
124.80 232.20
93.60 141.20
124.80 337.70
93.60 189.30
124.80 567.40
93.60 283.90
386.10 698.90
197.60 616.70
247.10 1326.60
0.00 99.80
296.40 375.30
247.00 352.90
148.20 1576.10
370.50 390.40
177.80 205.00
177.80 191.80
177.80 216.70
177.80 196.90
237.10 479.20
154.40 374.20
97.50 264.90
296.40 315.70
0.00 11.20

labour & Hire-18-19


Page 952 of 2191

0.00 11.80
247.10 1342.30
257.40 1804.40
257.40 2967.90
0.00 79.40
193.10 1004.40
0.00 66.60
205.90 1245.80
0.00 4737.50
193.10 969.20
193.10 1127.90
210.60 276.70
32.30 221.90
296.40 2878.90
308.90 486.40
193.10 961.90
0.00 122.40
296.40 638.70
345.00
584.10 3577.30
584.10 2766.80
118.70

R THE YEAR 2017-18

Unit SoRate for


2013-14
( Rupees)
4 5
Per Hour 2661.20
Per Hour 1758.40
Per Hour 3601.92
Per Hour 2967.90
Per Hour 1843.52
Per Hour 924.10
6.00
Per Hour 2878.90
Per Hour 1131.00
Per Hour 880.50
Per Hour 698.88
Per Hour 464.80
Per Hour 472.64
Per Hour 568.23
Per Hour 588.40
Per Hour 1843.52
Per Hour 399.84

labour & Hire-18-19


Page 953 of 2191

Per Hour 1677.76


Per Hour 963.20
Per Hour 31556.00
Per Hour 27071.52
Per Hour 24268.16
Per Hour 21414.40
Per Hour 3426.65
Per Hour 2518.88
Per Hour 2875.04
Per Hour 1843.52
Per Hour 1436.96
Per Hour 946.40
Per Hour 234.08
Per Hour 1280.16
Per Hour 72.80
Per Hour 1379.73
Per Hour 1080.90
Per Hour 1917.50
Per Hour 899.36

Per Hour 1311.52


Per Hour 885.92
Per Hour 394.24
Per Hour 2419.20
Per Hour 3955.84
Per Hour 15.80
Per Hour 348.32

Per Hour 472.60


Per Hour 726.88
Per Hour 6132.00
Per Hour 3248.00
Per Hour 9757.44
Per Hour 20573.28
Per Hour 157.92

Per hour 2072.00


Per hour 1478.40
Per hour 1261.12
Per hour 842.20
Per K.m. 62.72
Per tonne 891.90
perHour
Per km 124.32
Per Hour 1261.12
Per Hour 53.76
Per Hour 828.00

labour & Hire-18-19


Page 954 of 2191

y to site and all other incidental

labour & Hire-18-19


Cent'g--18-19

CENTRING CHARGES - 2018-19

Sl NAME OF THE STRUCTURAL Material Hire Labour charges Centring Charges for
MEMBER charges 2018-19

1 2 3 4 5

HIRE CHARGES FOR CENTERING & SCAFFOLDING

A FOOTINGS Rs. 288.00 Rs. 631.00 Rs. 919.00


B BED BLOCKS, BANDS Rs. 64.00 Rs. 325.00 Rs. 389.00
C PEDESTALS Rs. 328.00 Rs. 1004.00 Rs. 1332.00
D PLINTH BEAMS Rs. 1390.00 Rs. 1521.00 Rs. 2911.00

HIRE CHARGES FOR CENTERING & SCAFFOLDING - Unsupported Height upto 3.66 M
Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc.,

E LINTELS Rs. 1180.00 Rs. 1615.00 Rs. 2795.00


F CHAJJAS - SUNSHADES Rs. 233.00 Rs. 248.00 Rs. 481.00
G COLUMNS Rs. 355.00 Rs. 2268.00 Rs. 2623.00
H BEAMS Rs. 2085.00 Rs. 1903.00 Rs. 3988.00
I SLABS - Up to 150 mm thick Rs. 236.00 Rs. 215.00 Rs. 451.00
J SLABS - above 150 mm - Up to 300 Rs. Rs. 465.00
mm thick 243.00 Rs. 222.00

K SLABS - above 300 mm thick Rs. 254.00 Rs. 232.00 Rs. 486.00
L WAFFLE - (GRID) SLABS (Rib Rs. Rs. 1641.00
Beams with Slabs) 858.00 Rs. 783.00

M PERGOLA SLABS (Only Rib Beams) Rs. 602.00 Rs. 549.00 Rs. 1151.00
N ARCH BEAMS - up to 1.5 M Span Rs. 2370.00 Rs. 2163.00 Rs. 4533.00
O ARCH BEAMS - above 1.5 M Span Rs. 2404.00 Rs. 2193.00 Rs. 4597.00
P DOME SLABS Rs. 3833.00 Rs. 3496.00 Rs. 7329.00
Q HELICAL STAIRCASES Rs. 292.00 Rs. 267.00 Rs. 559.00
R SHEAR WALLS, RCC WALLS,
WATER TANK WALLS Rs. 1206.00 Rs. 1653.00 Rs. 2859.00

HIRE CHARGES FOR CENTERING & SCAFFOLDING - Unsupported Height up to 3.66 M


Casuarinas Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc.,

D LINTELS Rs. 790.00 Rs. 1251.00 Rs. 2041.00


E CHAJJAS - SUNSHADES Rs. 156.00 Rs. 192.00 Rs. 348.00
F COLUMNS Rs. 238.00 Rs. 1757.00 Rs. 1995.00
G BEAMS Rs. 1395.00 Rs. 1473.00 Rs. 2868.00
H SLABS - Up to 150 mm thick Rs. 158.00 Rs. 167.00 Rs. 325.00
I SLABS - above 150 mm - Up to 300 Rs. 335.00
163.00 Rs. 172.00 Rs.
mm thick
J SLABS - above 300 mm thick Rs. 170.00 Rs. 180.00 Rs. 350.00
K WAFFLE - (GRID) SLABS (Rib Rs. 1182.00
Beams with Slabs) 575.00 Rs. 607.00 Rs.

Cent'g--18-19
Cent'g--18-19

L PERGOLA SLABS (Only Rib Beams) Rs. 403.00 Rs. 425.00 Rs. 828.00
M ARCH BEAMS - up to 1.5 M Span Rs. 1586.00 Rs. 1675.00 Rs. 3261.00
N ARCH BEAMS - above 1.5 M Span Rs. 1609.00 Rs. 1698.00 Rs. 3307.00
O DOME SLABS Rs. 2566.00 Rs. 2708.00 Rs. 5274.00
P HELICAL STAIRCASES Rs. 196.00 Rs. 207.00 Rs. 403.00
Q SHEAR WALLS, RCC WALLS, Rs.
WATER TANK WALLS

Note : For Shear Walls, RCC Walls, Water Tank walls the centring charges are for both faces (back and front)

HIRE CHARGES FOR ACCESS SCAFFOLDING - up to 3.66 M using Casuarinas Ballies, Bamboos, Wooden Reape
Runners, Wood Posts, Wall Plates etc., for BRICK MASONRY/ STONE MASONRY/ WALL PUTTY/ TEXTURE PAINTS
- 1 sqm

A 1st - Floor Rs. 10.32 Rs. 79.46 Rs. 89.78


B 2nd - Floor Rs. 10.32 Rs. 113.78 Rs. 124.10
C 3rd - Floor Rs. 10.32 Rs. 148.09 Rs. 158.41
D 4th - Floor Rs. 10.32 Rs. 182.41 Rs. 192.73
E 5th - Floor Rs. 10.32 Rs. 216.72 Rs. 227.04
F 6th - Floor Rs. 10.32 Rs. 251.03 Rs. 261.35
G 7th - Floor Rs. 10.32 Rs. 285.33 Rs. 295.65
H 8th - Floor Rs. 10.32 Rs. 319.65 Rs. 329.97
I 9th - Floor Rs. 10.32 Rs. 353.97 Rs. 364.29
J 10th - Floor Rs. 10.32 Rs. 388.27 Rs. 398.59
K 11th - Floor Rs. 10.32 Rs. 422.59 Rs. 432.91
L 12th - Floor Rs. 10.32 Rs. 456.91 Rs. 467.23
M 13th - Floor Rs. 10.32 Rs. 491.22 Rs. 501.54
N 14th - Floor Rs. 10.32 Rs. 525.52 Rs. 535.84
O 15th - Floor Rs. 10.32 Rs. 559.84 Rs. 570.16

Cent'g--18-19
Cent'g--18-19

HIRE CHARGES FOR ACCESS SCAFFOLDING - up to 3.66 M using Casuarinas Ballies, Bamboos, Wooden Reape
Runners, Wood Posts, Wall Plates etc., for PLASTERING to WALLS - 1 sqm
A 1st - Floor Rs. 1.03 Rs. 7.95 Rs. 8.98
B 2nd - Floor Rs. 1.03 Rs. 11.38 Rs. 12.41
C 3rd - Floor Rs. 1.03 Rs. 14.80 Rs. 15.83
D 4th - Floor Rs. 1.03 Rs. 18.24 Rs. 19.27
E 5th - Floor Rs. 1.03 Rs. 21.67 Rs. 22.70
F 6th - Floor Rs. 1.03 Rs. 25.11 Rs. 26.14
G 7th - Floor Rs. 1.03 Rs. 28.54 Rs. 29.57
H 8th - Floor Rs. 1.03 Rs. 31.96 Rs. 32.99
I 9th - Floor Rs. 1.03 Rs. 35.40 Rs. 36.43
J 10th - Floor Rs. 1.03 Rs. 38.83 Rs. 39.86
K 11th - Floor Rs. 1.03 Rs. 42.26 Rs. 43.29
L 12th - Floor Rs. 1.03 Rs. 45.69 Rs. 46.72
M 13th - Floor Rs. 1.03 Rs. 49.12 Rs. 50.15
N 14th - Floor Rs. 1.03 Rs. 52.55 Rs. 53.58
O 15th - Floor Rs. 1.03 Rs. 56.00 Rs. 57.03

HIRE CHARGES FOR STAGE SCAFFOLDING - up to 3.66 M using Casuarinas Ballies, Bamboos, Wooden Reaper
Runners, Wood Posts, Wall Plates etc., for CEILING PLASTERING - 1 sqm
A 1st - Floor Rs. 2.46 Rs. 15.91 Rs. 18.37
B 2nd - Floor Rs. 2.46 Rs. 22.57 Rs. 25.03
C 3rd - Floor Rs. 2.46 Rs. 29.23 Rs. 31.69
D 4th - Floor Rs. 2.46 Rs. 35.90 Rs. 38.36
E 5th - Floor Rs. 2.46 Rs. 42.56 Rs. 45.02
F 6th - Floor Rs. 2.46 Rs. 49.22 Rs. 51.68
G 7th - Floor Rs. 2.46 Rs. 55.89 Rs. 58.35
H 8th - Floor Rs. 2.46 Rs. 62.55 Rs. 65.01
I 9th - Floor Rs. 2.46 Rs. 69.22 Rs. 71.68
J 10th - Floor Rs. 2.46 Rs. 75.88 Rs. 78.34
K 11th - Floor Rs. 2.46 Rs. 82.54 Rs. 85.00
L 12th - Floor Rs. 2.46 Rs. 89.21 Rs. 91.67
M 13th - Floor Rs. 2.46 Rs. 95.80 Rs. 98.26
N 14th - Floor Rs. 2.46 Rs. 102.53 Rs. 104.99
O 15th - Floor Rs. 2.46 Rs. 109.20 Rs. 111.66

Cent'g--18-19
Cent'g--18-19

G FOR SUMPS AND SEPTIC TANKS (PH SSR ) Pg-7 of PH SoR-2016 - 17


4) RCC vertical walls of plane surface up to 3 m height
such as ground level tanks clarifiers and sludge digesters 31.b.4 1063.00
etc.
5) RCC vertical walls of circular faces up to 3 m height. 31.b.5 1352.00
6) Dome 31.b.6 1488.00
Lift or delift of materials :
a) Lifting of cement concrete for RCC elevated reservoir.
For every 1m height or part thereof over the initial lift of 3 m 32.a 162.00

b) Delifting the materials such as stones, concrete etc., for


concrete below ground level for construction of masonry
ground level reservoirs, construction of masonry ground
level reservoirs, inspection wells, test wells and sump wells 32.b 49.00
etc., for every 1 m depth or part thereof beyond the initial
depth of 3 meters from ground level.

for R C C Elevated Service Reservoir of staging up to 15 metre below L W L.


1) Slabs for thickness (150 mm to 300 mm) 3953.00
2) Slabs for thickness above (300 mm) 473.00
3) Side walls curved surfaces. 2986.00
4) Side wall straight surfaces. 2659.00
5) Dome. 1628.00
6) bottom Dome. 3238.00
7) Roof Slab. 893.00
8) Column braces and beams 1332.00
9) Circular braces, ring beams & circular column. 1463.00
10) Conical Slab 150 mm to 300 mm thickness 4141.00
11) Conical Slab for above 300 mm thickness, extra for every 50mm thickness 525.00

Note:- For RCC ELSR of staging above 15 m, the % increase in these rates shall be as follows.
15-18 m ---
18 - 21m ---
21- 24 m ---
24 -27m ---
above 27m ---

CENTERING & SCAFFOLDING CHARGES- FLOOR WISE RATES for Steel scaffo
for unsupported height 3.66 M for the year 2018-19 (Pg

CHAJJA SLABS -
Floor LINTELS SUN- COLUMNS BEAMS Up to 150
SHADES mm thick

Cent'g--18-19
Cent'g--18-19

CHAJJA SLABS -
Floor LINTELS SUN- COLUMNS BEAMS Up to 150
SHADES mm thick

Hire Charges H 1180.00 233.00 355.00 2085.00 236.00


Labour Charges L 1615.00 248.00 2268.00 1903.00 215.00
Total Hire Charges (H+L) T 2795.00 481.00 2623.00 3988.00 451.00

1st - Floor L 1615.00 248.00 2268.00 1903.00 215.00


2nd - Floor L 1777.00 273.00 2495.00 2093.00 237.00
3rd - Floor L 1938.00 297.00 2722.00 2283.00 258.00
4th - Floor L 2099.00 322.00 2948.00 2474.00 280.00
5th - Floor L 2261.00 347.00 3175.00 2664.00 301.00
6th - Floor L 2422.00 372.00 3402.00 2854.00 323.00
7th - Floor L 2584.00 397.00 3629.00 3044.00 344.00
8th - Floor L 2746.00 421.00 3856.00 3234.00 366.00
9th - Floor L 2906.00 446.00 4082.00 3425.00 387.00
10th - Floor L 3068.00 470.00 4309.00 3615.00 410.00
11th - Floor L 3230.00 496.00 4536.00 3805.00 431.00
12th - Floor L 3392.00 521.00 4763.00 3995.00 453.00
13th - Floor L 3553.00 545.00 4990.00 4185.00 474.00
14th - Floor L 3714.00 570.00 5216.00 4376.00 496.00
15th - Floor L 3876.00 594.00 5443.00 4566.00 517.00
Note: - Centering & scaffolding charges for steel scaffolding with pipes, jack props, steel centring plates for unsupporte
than the basic material hire charges and relevant labour charges of the applicable floor and item
4.27 M 16.67% 4.88 M 33.33%

CENTERING & SCAFFOLDING CHARGES- FLOOR WISE RATES for Casurina Ballies, Bam
Steel Centring Plates etc., for unsupported height 3.66

SLABS -
CHAJJASU
Floor LINTELS COLUMNS BEAMS Up to 150
N-SHADES
mm thick

Hire Charges H 790.00 156.00 238.00 1395.00 158.00


Labour Charges L 1251.00 192.00 1757.00 1473.00 167.00
Total Hire Charges (H+L) T 2041.00 348.00 1995.00 2868.00 325.00

1st - Floor L 1251.00 192.00 1757.00 1473.00 167.00


2nd - Floor L 1376.00 211.00 1932.00 1620.00 184.00
3rd - Floor L 1500.00 231.00 2108.00 1768.00 201.00
4th - Floor L 1625.00 250.00 2284.00 1915.00 217.00
5th - Floor L 1750.00 269.00 2459.00 2062.00 234.00
6th - Floor L 1876.00 289.00 2636.00 2210.00 251.00
7th - Floor L 2001.00 308.00 2811.00 2357.00 267.00
8th - Floor L 2126.00 327.00 2986.00 2504.00 284.00
9th - Floor L 2251.00 345.00 3162.00 2651.00 300.00
10th - Floor L 2376.00 365.00 3338.00 2799.00 317.00
11th - Floor L 2501.00 384.00 3513.00 2946.00 334.00
12th - Floor L 2626.00 403.00 3689.00 3093.00 351.00
13th - Floor L 2751.00 423.00 3865.00 3241.00 368.00

Cent'g--18-19
Cent'g--18-19

14th - Floor L 2876.00 442.00 4040.00 3388.00 384.00


15th - Floor L 3001.00 461.00 4216.00 3535.00 401.00

Note: - Centering & scaffolding charges for steel scaffolding with pipes, jack props, steel centering plates for unsuppor
than the basic material hire charges and relevant labour charges of the applicable floor and item

Cent'g--18-19
Cent'g--18-19

Unit of
Measurem't

per 1 cum
per 1 cum
per 1 cum
per 1 cum

upto 3.66 M
ng Plates,etc.,

per 1 cum
per 1 sqm
per 1 cum
per 1 cum
per 1 sqm
per 1 sqm

per 1 sqm
per 1 sqm

per 1 sqm
per 1 cum
per 1 cum
per 1 cum
per 1 sqm
per 1 sqm

o 3.66 M
ates etc.,

per 1 cum
per 1 sqm
per 1 cum
per 1 cum
per 1 sqm 145.21739 159.74
per 1 sqm

per 1 sqm
per 1 sqm

Cent'g--18-19
Cent'g--18-19

per 1 sqm
per 1 cum
per 1 cum
per 1 cum
per 1 sqm

d front)

oos, Wooden Reapers,


Y/ TEXTURE PAINTS etc

per 1 sqm 69.10 74.623304


per 1 sqm
per 1 sqm
per 1 sqm 119.19
per 1 sqm 34.32
per 1 sqm 68.64
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm

Cent'g--18-19
Cent'g--18-19

oos, Wooden Reapers,


qm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm

oos, Wooden Reapers,


m
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm

Cent'g--18-19
Cent'g--18-19

6 - 17

per 1 sqm

per 1 sqm
per 1 sqm

per 1 cum

per 1 cum

per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm
per 1 sqm

ws.
9%
15%
21%
27%
30%

S for Steel scaffolding pipes, jack Props, Steel Centering Plates,etc.,


e year 2018-19 (Pg.108 to 111 of Bld. Items )
SHEAR WALLS, RCC

WAFFLE -
WALLS, WATER
TANK WALLS

SLABS - (GRID)
SLABS - PERGOL ARCH ARCH
above 150 SLABS HELICAL
above A SLABS BEAMS - BEAMS - DOME
mm - Up to (Rib STAIR-
300 mm (Only Rib up to 1.5 above 1.5 SLABS
300 mm Beams CASES
thick Beams) M Span M Span
thick with
Slabs)
Cent'g--18-19
Cent'g--18-19

SHEAR WALLS, RCC


WAFFLE -

WALLS, WATER
TANK WALLS
SLABS - (GRID)
SLABS - PERGOL ARCH ARCH
above 150 SLABS HELICAL
above A SLABS BEAMS - BEAMS - DOME
mm - Up to (Rib STAIR-
300 mm (Only Rib up to 1.5 above 1.5 SLABS
300 mm Beams CASES
thick Beams) M Span M Span
thick with
Slabs)

243.00 254.00 858.00 602.00 2370.00 2404.00 3833.00 292.00 1206.00


222.00 232.00 783.00 549.00 2163.00 2193.00 3496.00 267.00 1653.00
465.00 486.00 1641.00 1151.00 4533.00 4597.00 7329.00 559.00 2859.00

222.00 232.00 783.00 549.00 2163.00 2193.00 3498.00 267.00 1653.00


244.00 255.00 862.00 604.00 2379.00 2413.00 3847.00 293.00 1818.00
266.00 278.00 940.00 659.00 2596.00 2632.00 4197.00 320.00 1983.00
288.00 301.00 1019.00 714.00 2812.00 2852.00 4547.00 347.00 2148.00
310.00 324.00 1096.00 769.00 3028.00 3071.00 4896.00 374.00 2314.00
333.00 349.00 1175.00 824.00 3245.00 3291.00 5247.00 400.00 2479.00
355.00 372.00 1254.00 879.00 3461.00 3509.00 5597.00 426.00 2644.00
377.00 395.00 1331.00 933.00 3677.00 3729.00 5946.00 454.00 2810.00
399.00 418.00 1410.00 988.00 3893.00 3948.00 6296.00 480.00 2975.00
421.00 441.00 1488.00 1044.00 4110.00 4167.00 6645.00 507.00 3141.00
443.00 464.00 1567.00 1098.00 4326.00 4387.00 6995.00 533.00 3305.00
465.00 487.00 1645.00 1153.00 4542.00 4606.00 7345.00 560.00 3470.00
487.00 510.00 1723.00 1209.00 4759.00 4826.00 7694.00 587.00 3636.00
509.00 533.00 1802.00 1263.00 4975.00 5045.00 8044.00 613.00 3801.00
531.00 557.00 1880.00 1318.00 5191.00 5265.00 8394.00 641.00 3967.00
plates for unsupported heights of every 610 mm height above 3.66 M may be allowed at 16.666% more

5.49 M 50.00% 6.1 M 66.66% 6.71 M 83.33%

urina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates,
pported height 3.66 M for the year 2018-19
WAFFLE -
SLABS - (GRID)
SLABS - PERGOL ARCH ARCH
above 150 SLABS HELICAL
above A SLABS BEAMS - BEAMS - DOME
mm - Up to (Rib STAIR-
300 mm (Only Rib up to 1.5 above 1.5 SLABS
300 mm Beams CASES
thick Beams) M Span M Span
thick with
163.00 170.00 Slabs)
575.00 403.00 1586.00 1609.00 2566.00 196.00
172.00 180.00 607.00 425.00 1675.00 1698.00 2708.00 207.00
335.00 350.00 1182.00 828.00 3261.00 3307.00 5274.00 403.00

172.00 180.00 607.00 425.00 1675.00 1698.00 2708.00 207.00


189.00 197.00 668.00 468.00 1843.00 1868.00 2979.00 228.00
207.00 215.00 729.00 510.00 2010.00 2037.00 3250.00 248.00
224.00 233.00 789.00 553.00 2178.00 2207.00 3521.00 269.00
242.00 251.00 849.00 595.00 2345.00 2377.00 3792.00 290.00
258.00 270.00 910.00 638.00 2513.00 2547.00 4062.00 311.00
275.00 288.00 971.00 680.00 2680.00 2716.00 4332.00 331.00
293.00 306.00 1032.00 723.00 2848.00 2886.00 4603.00 352.00
310.00 323.00 1092.00 765.00 3015.00 3057.00 4874.00 373.00
328.00 341.00 1153.00 809.00 3183.00 3226.00 5145.00 393.00
344.00 359.00 1214.00 851.00 3350.00 3396.00 5416.00 414.00
361.00 377.00 1275.00 894.00 3518.00 3566.00 5687.00 435.00
379.00 395.00 1336.00 936.00 3684.00 3735.00 5958.00 455.00

Cent'g--18-19
Cent'g--18-19

396.00 413.00 1395.00 979.00 3852.00 3905.00 6229.00 476.00


414.00 431.00 1456.00 1021.00 4019.00 4075.00 6500.00 497.00

g plates for unsupported heights of every 610 mm height above 3.66 M may be allowed at 16.666% more

Cent'g--18-19
Cent'g--18-19

1144
1255
1368.0
1501

Cent'g--18-19
Page 968 of 2191

KODADA MUNICIPALITY
DATA BASED ON - 2016 - 2017 SSR
WATER SUPPLY AND SANITARY ITEMS

Ref. to SSR
S.N Description Qty Rate Unit
Code No
1 TBSP-A.I-01: Supplying, laying, jointing and testing 101.6 mm SWG SP-1 pipes of ISI make conformin
to ISI 651 & 4127 with airtight cement joints in CM 1.5:1 prop. Including excavation of trenches an
socket pits in any soil (except rock requiring blasting) up to 1524 mm(5'0") depth and refilling wi
watering and tamping.

101.60 mm (4") dia SWG pipe upto 5' depth


TBSP-A.I-01 Rate as per SSR .1 1 Rmt 491.00 1 Rmt
labour charges only for laying, jointing and testing 20% 313.00
TBSP-A.III-02
SWG pipes

Over heads and Contractors profit @ 13.615%


Total
Rate per 1 Rmt

1 TBSP-A.I-02: Supplying, laying, jointing and testing 101.6 mm SWG SP-1 pipes of ISI make conformin
to ISI 651 & 4127 with airtight cement joints in CM 1:5:10 prop. including excavation of trenches an
socket pits in any soil (except rock requiring blasting) up to 914.4 mm (3'0") depth and refilling wi
watering and tamping.

101.60mm (6") dia SWG pipe upto 3' depth


TBSP-A.I-02 Rate as per SSR.2 1 Rmt 423.00 1 Rmt
labour charges only for laying, jointing and testing 20% 252.00
TBSP-A.III-01
SWG pipes

Over heads and Contractors profit @ 13.615%


Total
Rate per 1 Rmt

2 TBSP-A.I-03: Supplying, laying, jointing and testing 152.4 mm SWG SP-1 pipes of ISI make conformin
to ISI 651 & 4127 with airtight cement joints in CM 1.5:10 prop. including excavation of trenches an
socket pits in any soil (except rock requiring blasting) up to 1524 mm(5'0") depth and refilling wi
watering and tamping.
152.4 mm (6") dia SWG pipe upto 5' depth
TBSP-A.I-03 Rate per 1 RM 1 Rmt 708.00 1 Rmt
labour charges only for laying, jointing and testing 20% 313.00
TBSP-A.III-02
SWG pipes

Over heads and Contractors profit @ 13.615%


Total
Rate per 1 Rmt

2 TBSP-A.I-04: Supplying, laying, jointing and testing 152.4 mm SWG SP-1 pipes of ISI make conformin
to ISI 651 & 4127 with airtight cement joints in CM 1.5:10 prop. including excavation of trenches an
socket pits in any soil (except rock requiring blasting) up to 914.4 mm (3'0") depth and refilling wi
watering and tamping.

152.4 mm (6") dia SWG pipe upto 3' depth


TBSP-A.I-04 Rate per 1 RM 1.00 Rmt 630.00 1 Rmt
labour charges only for laying, jointing and testing 20% 252.00
TBSP-A.III-01
SWG pipes

Over heads and Contractors profit @ 13.615%


Total

data-WS & Sanitary-18-19 447524687.xlsx


Page 969 of 2191

Rate per 1 RM

3 TBSP-A.I-05: Supplying , laying, jointing and testing 152.4 mm CC bed 1:2:4 Prop: using 19.05 m
gauge graded granite metal chips and cradling 101.6 mm SWG pipe line all round to have 76.2 m
thick cover over the sockets.
TBSP-A.I-05 SSR item No. 5 1.00 Rmt 138.00 1 Rmt
BMW-A.08 labour charges only 20% 0.00
Total
Over heads and Contractors profit @ 14% 13.615%
Total
Rate per 1 RM

4 TBSP-A.I-06: Supplying, laying, jointing and testing 152.4 mm CC bed 1:2:4 Prop: using 19.05 m
gauge graded granite metal chips and cradling 152.4 mm SWG pipe line all round to have 76.2 m
thick cover over the sockets.
TBSP-A.I-06 SSR item No.6 1.00 Rmt 237.00 1 Rmt
BMW-A.10 Add Municipal allowance on Labour component- 20% 0.00 1 Rmt
Total
Over heads and Contractors profit @ 13.615% 13.615%
Total
Rate per 1 RM

5 TBSP-B.I-01: Constructing 904.0 mm (3’0”) dia solid block masonry inspection chamber as per IS
4111: Part-1:1986 with cement mortar (1:6) prop using fly-ash blocks of 225 mm thick from approve
source having a minimum crushing strength of 10 N/sq.mm including plastering with cement mortar 1
prop; ½” thick both inside and outside fitted with 20” dia RCC manhole covers and frames includin
excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying ceme
concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 m
thick as per Standard specification and including cost and conveyance of all materials like cemen
sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental an
operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc
complete for finished item of work as per Standard specification.

chamber 3' dia and upto 3' depth - Fly- ash bricks
TBSP-B.I-01 Rate as per SSR item - 74 1 No. 7338.00 Each
Over heads and Contractors profit @ 13.615% 13.615%
Total
Rate per 1 No

6 TBSP-B.I-02: Constructing 904.0 mm (3’0”) dia solid block masonry inspection chamber as per IS
4111: Part-1:1986 with cement mortar (1:6) prop using fly-ash blocks of 225 mm thick from approve
source having a minimum crushing strength of 10 N/sq.mm including plastering with cement mortar 1
prop; ½” thick both inside and outside fitted with 20” dia RCC manhole covers and frames includin
excavating pits up to a depth of 1524 mm (5'-0") in all sorts of soils (excluding rock) and laying ceme
concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 m
thick as per Standard specification and including cost and conveyance of all materials like cemen
sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental an
operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc
complete for finished item of work as per Standard specification.

chamber 3' dia and upto 5' depth - Fly- ash bricks
TBSP-B.I-02 Rate as per SSR item -75 1 No. 11694.00 Each
Over heads and Contractors profit @ 13.615% 13.615%
Total
Rate per 1 No

data-WS & Sanitary-18-19 447524687.xlsx


Page 970 of 2191

3 TBSP-B.I-03: Constructing 904.0 mm (3’0”) dia brick masonry inspection chamber as per IS - 4111: Par
1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approve
source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1
prop; ½” thick both inside and outside fitted with 20” dia RCC manhole covers and frames includin
excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying ceme
concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 m
thick as per Standard specification and including cost and conveyance of all materials like cemen
sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental an
operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc
complete for finished item of work as per Standard specification.

chamber 3' dia and upto 3' depth - Clay bricks


TBSP-B.I-03 Rate as per SSR item.76 1 No. 7321.00 Each
Over heads and Contractors profit @ 13.615% 13.615%
Total
Rate per 1 No

4 TBSP-B.I-04: Constructing 904.0 mm (3’0”) dia brick masonry inspection chamber as per IS - 4111: Par
1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approve
source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1
prop; ½” thick both inside and outside fitted with 20” dia RCC manhole covers and frames includin
excavating pits up to a depth of 1524 mm (5'-0") in all sorts of soils (excluding rock) and laying ceme
concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 m
thick as per Standard specification and including cost and conveyance of all materials like cemen
sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental an
operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc
complete for finished item of work as per Standard specification.

chamber 3' dia and upto 5' depth - Clay bricks


TBSP-B.I-04 Rate as per SSR item -77 1 No. 11649.00 Each
Over heads and Contractors profit @ 13.615% 13.615%
Total
Rate per 1 No

5 TBSP-B.II-01: Constructing 914.4 mm x 457.2 mm (3'0"x1'6") brick in CM 1:6 prop. Masonry Inspectio
chamber up to 914.4 mm (3'0") and fitted with light weight 914.4 mm x 457.2 mm (3'0"x1'6") C.I fram
and cover of 40 Kg.
TBSP-B.II-01 Rate as per SSR item -78 1 No. 6324.00 Each
Over heads and Contractors profit @ 13.615% 13.615%
Total
Rate per 1 No

6 TBSP-B.II-02: Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspectio
chamber up to 914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I fram
and cover of 20 Kg.
TBSP-B.II-02 Rate as per SSR item -79 1 No. 3813.00 Each
Over heads and Contractors profit @ 13.615% 13.615%
Total
Rate per 1 No

7 TBSP-B.III-01: Making drainage connection in the existing inspection chamber including all repairs
TBSP-B.III-01 Rate as per SSR item-91 1 No. 130.00 1 Each
Add Municipal allowance on Labour component- 20% 0.00
BMW-B.08
SSR item-85
Total
Over heads and Contractors profit @ 13.615% 13.615%
Total
Rate per 1 No

data-WS & Sanitary-18-19 447524687.xlsx


Page 971 of 2191

5 TBSP-C.II-30 :TBSP-A.I-09: Supplying & fixing 150 mm x 100 mm SWG gully traps conforming to IS
651 & 4127 with C.I Grating & Cost. Brick masonry in CM 1:6 prop. Intermediate chamber and fitted wi
304.8 mm x 288.6mm (12"x9") C.I Frame and hinged cover
TBSP-A.I-09 Rate as per SSR Item No.9 1 No. 619.00 1 Each
Over heads and Contractors profit @ 13.615% 13.615%
Total
Rate per 1 No

6 TBSP-C.II-30: Supplying & fixing CI floor traps 1st quality ISI marked conforming to IS:172
1979 with C.P. Grating fixing with white cement as per site requirements with standard
practice for nominal dia 75 mm (3") and grating size 100 mm dia of weight not less than 4.0 Kgs
TBSP-C.II-30 Rate as per SSR item-127 1 No. 326.00 1 Each
BMW-C.42 Add Municipal allowance on Labour 20% 0.00

Over heads and Contractors profit @ 13.615% 13.615%


Total
Rate per 1 No

Observed Data
7 TBSP-E.I-01:Providing and fixing 23" (584.2mm) long white glazed Indian WC Orissa pan
parry/Neycer/HSW make with P or S trap with brick masonry seat, CC squatting plate and 10 lit capaci
PVC slimline low level flush tank of approved make with internal components and fixed with woode
gutties as approved by Engineer-in-charge with required size nails, 15mm PVC connections 31.75 m
brass plumber union nuts, 32mm dia long CP bend and 12.70 mm (1/2")NP stop cock, heavy duty (30
grams), P trap or S trap of Indian W.C. shall be encased on CC (1:2:4) 6” alround well above the joint
stop leakage at the joint etc., complete including cost and conveyance of all materials to site, cost of C
bed, labour charges and seigniorage charges etc., complete for finished item of work.

With Flush tank


TBSP-E.I-01 Cost of 580 mm(23") Orissa pan 1 No. 865.00 1 Each
Add Municipal allowance on Labour -SSR item- 20% 409.00
TBSP-E.VIII-02
289
TBSP-E.I-06 Cost of Brick masonry seat 1 No. 271.00 1 Each
TBSP-E.I-07 Cost of C C squatting plate 1 No. 81.00 1 Each
S & F slim line porcelein flush tank 10 Ltrs. 1 No. 2089.00 1 Each
TBSP-E.IV-01
capacity of approved make - Sl.No.263
Add Municipal allowance on Labour -SSR item- 20% 572.00
TBSP-E.VIII-04
291
S & F of 15 mm PVC connection with brass union 1 No. 101.00 1 Each
TBSP-J.I-32
nuts - Sl.No.644
BMW-I.49 Add Municipal allowance on Labour 20% 0.00
TBSP-F.IV-02 S&F 15 mm nominal size brass concealed stop 1 No. 224.00 1 Each
valve screw type with internal /external
threaded conforming to IS 8931
Add Municipal allowance on Labour -SSR item- 20% 0.00
BMW-E.02
175
TBSP-F.VII-30 31.75mm brass plumber union - S.No.376 1 No. 63.00 1 Each
TBSP-F.VII-36 Cost of CP bend as per S.No. No.382 1 No 159.00 1 Each
S & F 76.2 x 101.6 mm teak wood block 2 Nos 24.00 1 Each
TBSP-J.I-31
-S.No.643
BMW-I.43 Add Municipal allowance on Labour - 20% 0.00

Over heads and Contractors profit @ 13.615% 13.615% 4097.20

Rate per 1 No say

data-WS & Sanitary-18-19 447524687.xlsx


Page 972 of 2191

8 TBSP-E.I-01:Providing and fixing 23" (584.2mm) long white glazed Indian WC Orissa pan
parry/Neycer/HSW make with P or S trap with brick masonry seat, CC squatting plate as approved b
Engineer-in-charge, W.C. shall be encased on CC (1:2:4) 6” alround well above the joint to stop leakag
at the joint etc., complete including cost and conveyance of all materials to site, cost of CC bed, labo
charges and segniorage charges etc., complete for finished item of work.

Without Flush tank (General Toilets)


TBSP-E.I-01 Cost of 584.2mm(23") Orissa pan 1 No. 865.00 1 Each
TBSP-E.VIII-02 Add Municipal allowance on Labour -SSR item- 20% 409.00
TBSP-E.I-06 289
Cost of Brick masonry seat 1 No. 271.00 1 Each
TBSP-E.I-07 Cost of C C squatting plate 1 No. 81.00 1 Each

Over heads and Contractors profit @ 13.615% 13.615% 1298.80

Rate per 1 No
Observed Data
8 TBSP-E.II-02:Supply & fixing white glazed European water closet with variety as approved b
Engineer-in-charge, P" or S" trap with 4" CI outlet pipe of approved make, plastic seat and lid for EW
and rubber buffers as per ISI 2548 1963 with and low down porcelain flushing tank with
lid 10 Lit Capacity with internal components and fixed with wooden gutties with required size nail
32mm dia short CP bend, 15 mm PVC connections with brass union nuts and 12.70 mm (1/2")NP sto
cock heavy duty (300 grams), complete including cost and conveyance of all materials to site, f
finished item of work for all floors.

TBSP-E.II-02 European Water Closet white glazed with 'S' trap 1 No 1619.00 1 Each
-146
Add Municipal allowance on Labour -SSR item- 20% 287.00
TBSP-E.VIII-06
293
TBSP-E.V-01 S & F fixing of plastic seat and lid -S.No. 266 1 No 734.00 1 Each
Add Municipal allowance on Labour -SSR item- 20% 83.00
TBSP-E.VIII-07
294
S & F slim line porcelein flush tank 10 Ltrs. 1 No 2089.00 1 Each
TBSP-E.IV-01
capacity of approved make - Sl.No.263
Add Municipal allowance on Labour -SSR item- 20% 572.00
TBSP-E.VIII-04
291
S & F of 15 mm PVC connection with brass union 1 No 101.00 1 Each
TBSP-J.I-32
nuts - Sl.No.644
BMW-I.49 Add Municipal allowance on Labour 20% 0.00
S&F 15 mm nominal size brass concealed stop 1 No 224.00 1 Each
TBSP-F.IV-02 valve screw type with internal /external
threaded conforming to IS 8931
BMW-E.02 Add Municipal allowance on Labour 20% 0.00
TBSP-F.VII-36 Cost of CP bend as per S.No. No.382 1 No 159.00 1 Each
S & F 76.2 x 101.6 mm teak wood block 2 Nos 24.00 1 Each
TBSP-J.I-31
-S.No.643
BMW-I.43 Add Municipal allowance on Labour - 20% 0.00

Over heads and Contractors profit @ 13.615% 13.615% 5162.40

Rate per 1 No

9 TBSP-E.II-04:Supply, Installation and commissioning approved make floor mounted EWC (su
CASCADE model 'P' or 'S' trap with dual flush porcelain cistern fixed on EWC with all internal parts
dual flush cistern, ultra solid seat cover of approved make with rubber buffer and cap 15 mm ang
stop cock 450 mm long PVC inter connection pipe wall flanges all of approved make et
complete for finished item of work in all respects: White Colour

TBSP-E.II-04 Basic Rate as per SSR S.No.257 1 No 7986.00 1 Each


Over heads and Contractors profit @ 13.615% 13.615% 7986.00

Rate per 1 No

data-WS & Sanitary-18-19 447524687.xlsx


Page 973 of 2191

10 TBSP-E.II-05:Supply, Installation and commissioning approved make floor mounted EWC (su
CASCADE model 'P' or 'S' trap with dual flush porcelain cistern fixed on EWC with all internal parts
dual flush cistern, ultra solid seat cover of approved make with rubber buffer and cap 15 mm ang
stop cock 450 mm long PVC inter connection pipe wall flanges all of approved make et
complete for finished item of work in all respects: Coloured - Grade - I/ Grade - II

TBSP-E.II-05 Basic Rate as per SSR S.No.258 1 No 11672.00 1 Each


Over heads and Contractors profit @ 13.615% 13.615% 11672.00

Rate per 1 No

10 TBSP-E.II-06: Supply, Installation and commissioning approved make floor mounted EWC (su
CASCADE model 'P' or 'S' trap with dual flush porcelain cistern fixed on EWC with all internal parts
dual flush cistern, ultra solid seat cover of approved make with rubber buffer and cap 15 mm ang
stop cock 450 mm long PVC inter connection pipe wall flanges all of approved make et
complete for finished item of work in all respects: Special Colour - Grade - III

TBSP-E.II-06 Basic Rate as per SSR S.No.259 1 No 14866.00 1 Each


Over heads and Contractors profit @ 13.615% 13.615% 14866.00

Rate per 1 No

11 TBSP-E.VI-01: Supplying & Fixing 660 x 460 mm - Indian make Flat Back Wash Hand Bas
(HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubb
plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 an
fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seik
Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden bloc
Single C.P. Pillar cock

TBSP-E.VI-01 Basic rate as per S.No. 268 1 No 2237.00 1 Each


TBSP-E.VI-12 Supplying and Fixing Pedestal - S.No.279 1 No 1036.00 1 Each
Over heads and Contractors profit @ 13.615% 13.615% 3273.00

Rate per 1 No

12 TBSP-E.VI-02:Supplying & Fixing 630 x 450 mm - Indian make Flat Back Wash Hand Bas
(HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubb
plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 an
fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seik
Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block
Single C.P. Pillar cock

TBSP-E.VI-02 Basic rate as per S.No. 269 1 No 1981.00 1 Each


TBSP-E.VI-12 Supplying and Fixing Pedestal - S.No.279 1 No 1036.00 1 Each
Over heads and Contractors profit @ 13.615% 13.615% 3017.00

Rate per 1 No

11 TBSP-E.VI-03: Supplying & Fixing 630 x 450 mm Indian make Flat Back Wash Hand Bas
(HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubb
plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 an
fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seik
Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block:
Double C.P. Pillar cock

TBSP-E.VI-03 Basic rate as per S.No. 270 1 No 2428.00 1 Each


TBSP-E.VI-12 Supplying and Fixing Pedestal - S.No.279 1 No 1036.00 1 Each
Over heads and Contractors profit @ 13.615% 13.615% 3464.00

Rate per 1 No

data-WS & Sanitary-18-19 447524687.xlsx


Page 974 of 2191

12 TBSP-E.VI-04: Supplying & Fixing 550 x 400 mm -Indian make Flat Back Wash Hand Bas
(HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubb
plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 an
fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seik
Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block
Single C.P. Pillar cock

TBSP-E.VI-04 Basic rate as per S.No. 271 1 No 1469.00 1 Each


TBSP-E.VI-12 Supplying and Fixing Pedestal - S.No.279 1 No 1036.00 1 Each
Over heads and Contractors profit @ 13.615% 13.615% 2505.00

Rate per 1 No
Observed Data
12 TBSP-E.VI-05: Supplying & Fixing 550 x 400 mm Indian make Flat Back Wash Hand Bas
(HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubb
plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 an
fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seik
Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block:
Single C.P. Pillar cock

TBSP-E.VI-05 Basic rate as per S.No. 272 1 No 1789.00 1 Each


TBSP-E.VI-12 Supplying and Fixing Pedestal - S.No.279 1 No 1036.00 1 Each
Over heads and Contractors profit @ 13.615% 13.615% 2825.00

Rate per 1 No

Observed Data
13 TBSP-E.VI-06: Supplying & Fixing 450 x 300 mm - Indian make Flat Back Wash Hand Bas
(HSW/Parryware/Neycer) 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubb
plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 an
fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seik
Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden bloc
Single C.P. Pillar cock

TBSP-E.VI-06 Basic rate as per S.No. 273 1 No 1278.00 1 Each


TBSP-E.VI-12 Supplying and Fixing Pedestal - S.No.279 1 No 1036.00 1 Each
Over heads and Contractors profit @ 13.615% 13.615% 2314.00

Rate per 1 No

14 TBSP-E.VI-07: Supplying & Fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neyce
1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nomin
size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nomin
bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso o
equivalent complete with standard CI brackets including wooden block: 450 x 300 mm - Doub
C.P. Pillar cock

TBSP-E.VI-07 Basic rate as per S.No. 274 1 No 1661.00 1 Each


TBSP-E.VI-12 Supplying and Fixing Pedestal - S.No.279 1 No 1036.00 1 Each
Over heads and Contractors profit @ 13.615% 13.615% 2697.00

Rate per 1 No

15 TBSP-E.VI-11:Supply, installing and commissioning Oval shape basin white glazed 520 x 410mm
approved make with 1 No 31.75mm CP bottle trap with extention pipe, 12.70mm single NP pillar coc
(400) grams 1 st quality, 1 No. 32mm dia CP waste coupling, CI brackets, 1 No. 12.7mm NP stop coc
(300 grams), 1 No.12.70mm PVC connection with brass union nuts, brass plumber union nut
Chiselling brick masonry wall, wooden blocks & nails including cost and conveyance of all materials
site, labour charges etc. complete for finished item of work.

TBSP-E.VI-11 Cost of Oval shape Wash hand basin- S.No. 278 1 No. 2250.00 1 Each

data-WS & Sanitary-18-19 447524687.xlsx


Page 975 of 2191

TBSP-F.IV- S&F 15 mm nominal size brass concealed stop 1 No. 551.00 1 Each
05 valve screw type with internal /external
threaded conforming to IS 8931
S& F 38.1 mm dia PVC solid waste pipe outlet- 1 No. 89.00 1 Each
TBSP-H.II-05
S.No.508
TBSP-H.II-04 Cost of 31.75 waste water pipe - S.No.507 1 No. 26.00 1 Each
S & F of 15 mm PVC connection with brass union 1 No. 101.00 1 Each
TBSP-J.I-32
nuts - Sl.No.644
Chiselling the brick masonry wall and repairs as 1 Rmt 30.00 1 Rmt
TBSP-J.I-05
directed by the department

Over heads and Contractors profit @ 13.615% 13.615% 3047.00

Rate per 1 No say


Observed Data
14 TBSP-E.VII-01:Supplying & Fixing white glazed flat back Bowl urinals of size 440 mm x 265 mm x 31
mm with internal flushing rim fixed with screws complete,1st quality ISI marked variety, as approved b
Engineer-in-charge, 15 mm PVC connections with brass plumber union nuts, S&F of 15 mm brass bod
CP finish self closing tap push type conforming to IS 1711 1st quality of approved make including 40 m
dia. PVC waste pipe including cost 76.2 x 101.6 mm teak wood block and conveyance of all materials
site, labour charges etc., complete for finished item of work for all floors.

TBSP-E.VII-01 Rate as per SSR item 284. 1 No 767.00 1 Each


TBSP-E.VIII-11 Add Municipal allowance on Labour 20% 163.00
15mm PVC connections with brass plumber union 1 No 101.00 1 Each
TBSP-J.I-32
nuts - S.No.644
BMW-I.49 Add Municipal allowance on Labour - 20% 0.00
S&F of 15 mm brass body CP finish self closing 1 No 246.00 1 Each
TBSP-F.III-01
tap push type conforming to IS 1711
Supply & Fixing 40 mm nominal size dia PVC 1 No 89.00 1 Each
TBSP-H.II-05 solid waste
S&F 76.2 x 101.6 mm teak wood block complete 2 No 24.00 1 Each
TBSP-J.I-31

BMW-I.43 Add Municipal allowance on Labour - 20% 0.00

Over heads and Contractors profit @ 13.615% 13.615% 1283.60

Rate per 1 No

15 TBSP-E.VII-02:Supplying & Fixing white glazed flat back half stall urinals of size 410 x 265 x 30
mm with internal flushing rim fixed with screws complete,1st quality ISI marked variety, as approved b
Engineer-in-charge, 12.7mm PVC connections with brass plumber union nuts, 12.70mm push cock 1
quality of approved make including 32mm dia. PVC waste pipe including cost and conveyance of a
materials to site, labour charges etc., complete for finished item of work for all floors.
TBSP-E.VII-02 Rate as per SSR item 285 1 No 2300.00 1 Each
15mm PVC connections with brass plumber union 1 No 101.00 1 Each
TBSP-J.I-32
nuts - S.No.644
BMW-I.49 Add Municipal allowance on Labour - 20% 0.00
S&F of 15 mm brass body CP finish self closing 1 No 246.00 1 Each
TBSP-F.III-01
tap push type conforming to IS 1711
Supply & Fixing 40 mm nominal size dia PVC 1 No 89.00 1 Each
TBSP-H.II-05
solid waste
S&F 76.2 x 101.6 mm teak wood block complete 2 No 24.00 1 Each
TBSP-J.I-31

BMW-I.43 Add Municipal allowance on Labour - 20% 0.00

Over heads and Contractors profit @ 13.615% 13.615% 2784.00

Rate per 1 No

data-WS & Sanitary-18-19 447524687.xlsx


Page 976 of 2191

Observed Data
15 TBSP-E.VII-03:Supplying & Fixing white glazed flat back half stall urinals of size 590 x 375 x 39
mm with internal flushing rim fixed with screws complete,1st quality ISI marked variety, as approved b
Engineer-in-charge, 15 mm PVC connections with brass plumber union nuts, S&F of 15 mm brass bod
CP finish self closing tap push type conforming to IS 1711 1st quality of approved make including 40 m
dia. PVC waste pipe including cost 76.2 x 101.6 mm teak wood block and conveyance of all materials
site, labour charges etc., complete for finished item of work for all floors.

TBSP-E.VII-03 Rate as per SSR item 286 1 No 2555.00 1 Each


15mm PVC connections with brass plumber union 1 No 101.00 1 Each
TBSP-J.I-32
nuts - S.No.644
BMW-I.49 Add Municipal allowance on Labour - 20% 0.00
S&F of 15 mm brass body CP finish self closing 1 No 246.00 1 Each
TBSP-F.III-01
tap push type conforming to IS 1711
Supply & Fixing 40 mm nominal size dia PVC 1 No 89.00 1 Each
TBSP-H.II-05
solid waste
S&F 76.2 x 101.6 mm teak wood block complete 2 No 24.00 1 Each
TBSP-J.I-31

BMW-I.43 Add Municipal allowance on Labour - 20% 0.00

Over heads and Contractors profit @ 13.615% 13.615% 3039.00

Rate per 1 No

16 Supplying & Fixing white glazed squatting type urinal 1st quality ISI marked variety, as approved b
Engineer-in-charge, 15mm PVC connections with brass plumber union nuts, 12.70mm push cock 1
quality of approved make i including cost and conveyance of all materials to site, labour charges etc
complete for finished item of work for all floors.

Market Rate 1 No 350.00 each


15mm PVC connections with brass plumber union 1 No 101.00 each
nuts - S.No.644
BMW-I.49 Add Municipal allowance on Labour - 20% 0.00
S&F of 15 mm brass body CP finish self closing 1 No 246.00 each
BMW-E.29
tap push type conforming to IS 1711

Over heads and Contractors profit @ 13.615% 13.615% 697.00

Rate per Each

17 TBSP-E.VI-13:S & F of stainless steel sink with drain board of size 914.4 mm x 457.2mm, 1mm thick
Indian make on cantilever brackets with including 32mm C.P. waste coupling, supplying and fixing PV
waste pipe of required length including chasing brick masonry wall and making good restoring to origin
surfaces etc., complete.for finished item of work in all floors

TBSP-E.VI-13 Rate as per SSR S.No.280 1 No 6224.00 1 Each


TBSP-E.VIII-12 Add Municipal allowance on Labour - 20% 409.00
TBSP-H.II-05 Supply & Fixing 40 mm nominal size dia PVC solid 1 No 89.00 1 RM

Over heads and Contractors profit @ 13.615% 14% 6394.80

Rate per Each

17 TBSP-F.VII-21:S & F brass soap dish heavy type approved make with NP screws etc., comple
including cost and conveyance of all materials, labour charges for finished item of work in all floors
Rate as per SSR item.367 (-with 7 years 1 No 514.00 1 Each
TBSP-F.VII-21
warranty:)
Over heads and Contractors profit @ 13.615% 13.615% 514.00

data-WS & Sanitary-18-19 447524687.xlsx


Page 977 of 2191

Rate per 1 No say

18 TBSP-J.I-35: Supplying and fixing TV shape mirror with plastic frame size 609.6 mm x 457 .2 mm

TBSP-J.I-35 Rate as per SSR S.No.647 1 No. 466.00 1 Each


BMW-I.106 Labour charges only 20% 0.00

Over heads and Contractors profit @ 13.615% 13.615% 466.00

Rate per 1 No say

19 TBSP-J.I-25:S & F 25mm dia 0.60 mtrs. Long aluminium anodized towel rods with brackets etc
including cost and conveyance of all materials, labour charges etc., complete for finished item of work.
TBSP-J.I-25 Rate as per SSR S.No.637 1 No. 149.00 1 Each
TBSP-F.VIII-04 Labour charges only 20% 99.00

Over heads and Contractors profit @ 13.615% 13.615% 168.80

Rate per 1 No say

20 TBSP-F.VI-06:Supply & fixing overhead shower rose with revolving joint and 150 mm long swivel show
arm Jaquar make queen series. with 7 years warranty: Chrome plated / Jupiter Aqua Lines-JAL
equivalent seriesincluding cost and conveyance of all materials to work site all labour charges for fixin
etc., complete
TBSP-F.VI-06 Rate as per SSR 344 1 No. 1361.00 1 Each
Over heads and Contractors profit @ 13.615% 14% 1361.00

Rate per 1 No say

20 TBSP-F.I-02:S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight with
quarter turn spindle with either internal or external threaded connection conforming to IS 8931
300 grams
12.7 mm N.P bib tap heavy duty - SSR S.No.301 1 No. 543.00 1 Each
TBSP-F.I-02

Over heads and Contractors profit @ 13.615% 13.615% 543.00

Rate per 1 No say

21 TBSP-F.I-01: S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw
type (full turn) with internal /external threaded connection conforming to IS 8931
250 gms
12.7 mm N.P bib tap heavy duty - SSR S.No.300 1 No. 223.00 1 Each
TBSP-F.I-01

BMW-E.10 Labour charges only 20% 0.00

Over heads and Contractors profit @ 13.615% 13.615% 223.00

Rate per 1 No say

22 TBSP-F.I-07: S&F of Chromium plated finish


brass body quarter turn
Bibcock cum Health Faucet with 1m long
tube and wall
hook with 7 - 10 years warranty
TBSP-F.I-07 Rate as per SSR item No. 306 1 No. 2914.00 1 Each
Over heads and Contractors profit @ 14% 2914.00

data-WS & Sanitary-18-19 447524687.xlsx


Page 978 of 2191

Rate per 1 No say

23 TBSP-D.I-01:Supplying and fixing of CI pipes ISI marked (IS No. 1729) variety with cement caulke
joints and fixing all special such as plug bends, off sets, single junctions, double junctions as per si
requirement including painting black with Japan paint and fixing with necessary wooden blocks fixed
the masonry walls in CM (1.5:1) and including fixing of MS clamps if necessary with required number
Bombay nails including cost and conveyance of all materials to site, labour charges etc.complete f
finished item of work at all floor levels. (APSS No. 1302 1319 & 1326)

With Cement jointing for exposed pipes


For 76.20mm dia(3") dia per 10 RM
TBSP-D.I-01 76.20mm dia (3") dia 10.00 RM 1484.00 3 RM
TBSP-C.III-01 Labour charges only for fixing of C.I. soil pipes 20% 246.00
TBSP-D.II-30 Cost of C.I soil single junction with plug 76.2 mm 1 No. 489.00 1 Each
TBSP-C.III-03 (3")
Labour charges only fixing CI soil single junctions 20% 98.00
TBSP-D.II-59 Supplying and Fixing of 75mm C.I. Offsets 1 No. 403.00 1 Each
TBSP-C.III-05 Labour charges only fixing CI Offset 20% 49.00
TBSP-D.II-13 Cost of C.I soils plug bend - 3" dia (76.2 mm) 1 No. 365.00 1 Each
TBSP-C.III-02 Labour charges only fixing CI Plug bend 20% 78.00
Rate per 10 RM
Rate per 1 RM
Over heads and Contractors profit @ 14% 629.79

Rate per 1 RM say

For 101.60mm dia (4") dia per 10 RM


TBSP-D.I-02 101.60mm dia (4") dia 10.00 RM 1975.00 3 RM
TBSP-C.III-01 Labour charges only for fixing of C.I. soil pipes 20% 246.00
TBSP-D.II-34 Cost of C.I soil single junction with plug 101.6 mm 1 No. 765.00 1 Each
TBSP-C.III-03 (4")
Labour charges only fixing CI soil single junctions 20% 98.00
Supplying and Fixing of 75mm C.I. Offsets for 1 No. 489.00 1 Each
TBSP-D.II-60
101.60mm dia pipe
TBSP-C.III-05 Labour charges only fixing CI Offset 20% 49.00
TBSP-D.II-14 Cost of C.I soils plug bend - 4" dia (101.6 mm) 1 No. 429.00 1 Each
TBSP-C.III-02 Labour charges only fixing CI Plug bend 20% 78.00
Rate per 10 RM
Rate per 1 RM
Over heads and Contractors profit @ 14% 836.05

Rate per 1 RM say

24 TBSP-J.I-30:Supplying and fixing A.C Cowls first quality including cost and conveyance of all material
all labour charges , etc. complete for finished item of work

63.5 mm Dia. A.C Cowl


TBSP-J.I-30 Rate as per SSR item .No. 642 1 No. 44.00 1 Each
BMW-C.14 Labour charges only, fixing AC Cowl 20% 0.00

Over heads and Contractors profit @ 14% 44.00

Rate per 1 RM say

88.9 mm Dia. A.C Cowl


TBSP-J.I-29 Rate as per SSR.no. 641 1 No. 65.00 1 Each
BMW-C.12 Labour charges only, fixing AC Cowl 20% 0.00

Over heads and Contractors profit @ 14% 65.00

data-WS & Sanitary-18-19 447524687.xlsx


Page 979 of 2191

Rate per 1 No. say


22 Supply and fixing of 15 mm brass body CP finish self closing tap push including cost an
coveyance of all material and all labour charges etc,.
TBSP-F.III-01 15 mm brass body CP finish self closing tap 1 No. 246.00 1 Each
TBSP-F.VIII-01 Labour charges only 20% 51.00

Over heads and Contractors profit @ 13.615% 13.615% 256.20

Rate per 1 No say

23 TBSP-G.I-01:Supplying & fixing GI pipe Medium Grade as per IS 1239 ISI mark in ground or on wa
including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc
with necessary excavation in all types of soils except rock requiring blasting, refilling, chasing mason
walls and making good the walls & floors to the originals, surface and fixing MS clamps of TW block o
walls, including cost and conveyance of all materials and labour charges complete for finished item
work.
15 mm dia nominal bore
TBSP-G.I-01 Rate as per SSR 1.00 RM 166.00 RM
BMW-F.80 Labour charges only 20% 0.00
For 1 RM
Over heads and Contractors profit @ 13.615% 166.00

Rate per 1 RM say

20 mm dia nominal bore


TBSP-G.I-02 Rate as per SSR 1.00 RM 190.00 RM
BMW-F.82
Labour charges only 20% 0.00
For 1 RM
Over heads and Contractors profit @ 13.615% 190.00

Rate per 1 RM say

25 mm dia nominal bore


TBSP-G.I-03 Rate as per SSR 1.00 RM 250.00 RM
BMW-F.84 Labour charges only 20% 0.00
For 1 RM
Over heads and Contractors profit @ 13.615% 250.00

Rate per 1 RM say

32 mm dia nominal bore


TBSP-G.I-04 Rate as per SSR 1.00 RM 347.00 RM
BMW-F.86 Labour charges only 20% 0.00
For 1 RM
Over heads and Contractors profit @ 14% 347.00

Rate per 1 RM say

40 mm dia nominal bore


TBSP-G.I-05 Rate as per SSR 1.00 RM 392.00 RM
BMW-F.88 Labour charges only 20% 0.00
For 1 RM
Over heads and Contractors profit @ 13.615% 392.00

Rate per 1 RM say

50 mm dia nominal bore

data-WS & Sanitary-18-19 447524687.xlsx


Page 980 of 2191

TBSP-G.I-06 Rate as per SSR 1.00 RM 428.00 RM


BMW-F.90 Labour charges only 20% 0.00
For 1 RM
Over heads and Contractors profit @ 13.615% 428.00

Rate per 1 RM say

TBSP-G.I-13:S & F 65 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 123
with GI fittings such as elbows tees couplings, nipples, plugs including excavation for trenches and
refilling the trenches complete except for GI bends union and GI connectors with checkout an
socket Tata or Zenith make or equivalent

65 mm dia nominal bore


TBSP-G.I-13 Rate as per SSR 1.00 RM 802.00 RM
For 1 RM
Over heads and Contractors profit @ 13.615% 802.00

Rate per 1 RM say

24 TBSP-G.III-01:Supplying & Fixing Gun metal Gate (GM peet) valve as per IS - 778 Class of approve
type including cost and conveyance of all materials & labour charges at all levels in all floors f
following.(Bronze)

For 15mm dia GI pipe


TBSP-G.III-01 Rate as per SSR 1 No. 577.00 Each
BMW-F.22 Labour charges only 20% 0.00

Over heads and Contractors profit @ 13.615% 577.00

Rate per 1 No say

For 20mm dia GI pipe


TBSP-G.III-02 Rate as per SSR 1 No. 778.00 Each
BMW-F.22 Labour charges only 20% 0.00

Over heads and Contractors profit @ 13.615% 778.00

Rate per 1 No say

For 25mm dia GI pipe


TBSP-G.III-03 Rate as per SSR 1 No. 1119.00 Each
BMW-F.18 Labour charges only 20% 0.00

Over heads and Contractors profit @ 13.615% 1119.00

Rate per 1 No say

For 32mm dia GI pipe


TBSP-G.III-04 Rate as per SSR 1 No. 1700.00 Each
BMW-F.24 Labour charges only 20% 0.00

Over heads and Contractors profit @ 13.615% 1700.00

Rate per 1 No say

For 40mm dia GI pipe


TBSP-G.III-05 Rate as per SSR 1 No. 2297.00 Each

data-WS & Sanitary-18-19 447524687.xlsx


Page 981 of 2191

BMW-F.26 Labour charges only 20% 0.00

Over heads and Contractors profit @ 13.615% 2297.00

Rate per 1 No say

For 50mm dia GI pipe


TBSP-G.III-06 Rate as per SSR 1 No. 3365.00 Each
BMW-F.28 Labour charges only 20% 0.00

Over heads and Contractors profit @ 13.615% 3365.00

Rate per 1 No say

For 65mm dia GI pipe


TBSP-G.III-07 Rate as per SSR 1 No. 5196.00 Each
BMW-F.30 Labour charges only 20% 0.00

Over heads and Contractors profit @ 13.615% 5196.00

Rate per 1 No say

23 TBSP-G.III-09:Supplying & fixing Gunmetal (GM) Horizontal Check (Non return) Valve as per IS-77
I-class heavy duty of approved type including cost and conveyance of all materials & labour charges
all levels in all floors for following.

For 15mm dia GI pipe


TBSP-G.III-09 Rate as per SSR 1 No. 426.00 Each
BMW-F.34 Labour charges only 20% 0.00

Over heads and Contractors profit @ 13.615% 426.00

Rate per 1 No say

For 20mm dia GI pipe


TBSP-G.III-10 Rate as per SSR 1 No. 623.00 Each
BMW-F.42 Labour charges only 20% 0.00

Over heads and Contractors profit @ 13.615% 623.00

Rate per 1 No say

For 25mm dia GI pipe


TBSP-G.III-11 Rate as per SSR 1 No. 973.00 Each
BMW-F.36 Labour charges only 20% 0.00

Over heads and Contractors profit @ 13.615% 973.00

Rate per 1 No say

For 32mm dia GI pipe


TBSP-G.III-12 Rate as per SSR 1 No. 1428.00 Each
BMW-F.38 Labour charges only 20% 0.00

Over heads and Contractors profit @ 14% 1428.00

data-WS & Sanitary-18-19 447524687.xlsx


Page 982 of 2191

Rate per 1 No say

For 40mm dia GI pipe


TBSP-G.III-13 Rate as per SSR 1 No. 1981.00 Each
BMW-F.40 Labour charges only 20% 0.00

Over heads and Contractors profit @ 13.615% 1981.00

Rate per 1 No say

24 TBSP-G.III-14:Supplying & fixing Gunmetal (GM) Vertical Check (Non return) Valve as per IS-778
class heavy duty of approved type including cost and conveyance of all materials & labour charges at a
levels in all floors for following.(Bronze)

For 15mm dia GI pipe


TBSP-G.III-14 Rate as per SSR 1 No. 402.00 Each
BMW-F.44 Labour charges only 20% 0.00

Over heads and Contractors profit @ 14% 402.00

Rate per 1 No say

For 20mm dia GI pipe


TBSP-G.III-15 Rate as per SSR 1 No. 522.00 Each
BMW-F.46 Labour charges only 20% 0.00

Over heads and Contractors profit @ 14% 522.00

Rate per 1 No say

For 25mm dia GI pipe


TBSP-G.III-16 Rate as per SSR 1 No. 790.00 Each
BMW-F.48 Labour charges only 20% 0.00

Over heads and Contractors profit @ 14% 790.00

Rate per 1 No say

For 32mm dia GI pipe


TBSP-G.III-17 Rate as per SSR 1 No. 1088.00 Each
BMW-F.50 Labour charges only 20% 0.00

Over heads and Contractors profit @ 14% 1088.00

Rate per 1 No say

For 40mm dia GI pipe


TBSP-G.III-18 Rate as per SSR 1 No. 1315.00 Each
BMW-F.52 Labour charges only 20% 0.00

Over heads and Contractors profit @ 13.615% 1315.00

Rate per 1 No say

For 50mm dia GI pipe

data-WS & Sanitary-18-19 447524687.xlsx


Page 983 of 2191

TBSP-G.III-19 Rate as per SSR 1 No. 2086.00 Each


BMW-F.54 Labour charges only 20% 0.00

Over heads and Contractors profit @ 13.615% 2086.00

Rate per 1 No say

25 TBSP-G.III-20:Supplying & fixing Gunmetal (GM) Ball valve with SS Ball and SS Spindle as per IS
Class - I, Indian make heavy type of approved type including cost and conveyance of all materials
labour charges at all levels in all floors for following.

For 15mm dia GI pipe


TBSP-G.III-20 Rate as per SSR 1 No. 188.00 Each
BMW-F.56 Labour charges only 20% 0.00

Over heads and Contractors profit @ 14% 188.00

Rate per 1 No say

For 20mm dia GI pipe


TBSP-G.III-21 Rate as per SSR 1 No. 273.00 Each
BMW-F.58 Labour charges only 20% 0.00

Over heads and Contractors profit @ 14% 273.00

Rate per 1 No say

For 25mm dia GI pipe


TBSP-G.III-22 Rate as per SSR 1 No. 384.00 Each
BMW-F.60 Labour charges only 20% 0.00

Over heads and Contractors profit @ 14% 384.00

Rate per 1 No say

For 32mm dia GI pipe


TBSP-G.III-23 Rate as per SSR 1 No. 681.00 Each
BMW-F.62 Labour charges only 20% 0.00

Over heads and Contractors profit @ 14% 681.00

Rate per 1 No say

For 40mm dia GI pipe


TBSP-G.III-24 Rate as per SSR 1 No. 937.00 Each
BMW-F.64 Labour charges only 20% 0.00

Over heads and Contractors profit @ 14% 937.00

Rate per 1 No say

For 50mm dia GI pipe


TBSP-G.III-25 Rate as per SSR 1 No. 1408.00 Each
BMW-F.66 Labour charges only 20% 0.00

data-WS & Sanitary-18-19 447524687.xlsx


Page 984 of 2191

Over heads and Contractors profit @ 14% 1408.00

Rate per 1 No say

25 TBSP-H.II-01:Providing and placing on terrace (at all floor levels)polyetheylene water storage tank wi
double layer approved brand and manufacture with cover and suitable locking arrangement and makin
necessary holes for inlet and outlets and over flow pipes but without fittings and base support for tanks

TBSP-H.II-01 Rate as per SSR 1 Lts 7.00 Lt


BMW-G.02 Labour charges only 20% 0.00

Over heads and Contractors profit @ 13.615% 7.00

Rate per 1 Ltre Say

Observed Data
26 TBSP-E.VI-09:Supplying & Fixing Indian make white glazed vitreous china porcelain sink conforming
IS:2556-Part-5-1994 on cantilever brackets with waste fittings like rubber plug, chain, 32 mm nomin
size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 : 600 x 400 x 250 complete f
finished item of work in all floors.

TBSP-E.VI-09 Rate as per SSR S.No.276 1 No 4087.00 Each


TBSP-E.VIII-12 Labour charges only 20% 409.00
30 mm dia PVC flexible waste pipe of 914.4 mm 1 No 26.00 Each
TBSP-H.II-04
length

Over heads and Contractors profit @ 13.615% 4194.80

Rate per 1 No say

27 TBSP-E.VI-10:Supplying & Fixing Indian make white glazed vitreous china porcelain sink conforming
IS:2556-Part-5-1994 on cantilever brackets with waste fittings like rubber plug, chain, 32 mm nomina
size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 : 750 x 450 x 250 etc. comple
for finished item of work in all floors.

TBSP-E.VI-10 Rate as per SSR S.No.277 1 No 4599.00 Each


TBSP-E.VIII-12 Labour charges only 20% 409.00
TBSP-H.II-04 31.75 mm dia PVC flexible waste pipe of 914.4 1 Nos 26.00 Each
mm length
Over heads and Contractors profit @ 14% 4706.80

Rate per 1 No say

28 TBSP-E.VI-16:Supplying & Fixing 609.6 x 457.2 x 254 mm RCC terrazzo finished sink (or constructe
at site with 50.8mm thick) brass plug and chain including CI cantilever brackets etc. complete f
finished item of work in all floors.

TBSP-E.VI-16 Rate as per SSR S.No.283 1 No 652.00 Each


BMW-D.41 Labour charges only 20% 0.00
TBSP-H.II-04 31.75 mm dia PVC flexible waste pipe of 914.4 1 Nos 26.00 Each
mm length
Over heads and Contractors profit @ 14% 678.00

Rate per 1 No say

27 TBSP-J.I-05:Supplying and fixing of 20 mm marble partitioins of size 4' 0" x 2' 0" for urinals includin
rounding edges, three sides, fixing, polishing, etc. complete for finished item of work
Rate as per Quotation 0.72 Sqm 712.80 Sqm
TBSP-J.I-05 Chiselling the brick masonry wall (184) 1.2 RM 30.00 RM
Labour charges for fixing 1.2 RM 0.00 RM

data-WS & Sanitary-18-19 447524687.xlsx


Page 985 of 2191

Over heads and Contractors profit @ 13.615% 36.00

Rate per Each

28 TBSP-E.VII-04:Supplying & fixing 4" x 24" (101.6x609.6mm) white glazed porcelain channel fixed
brick masonry white cement pointing including fixing in CM ( 1 1/2:1) to the required slopes includin
cost and conveyance of all materials and labour charges for finished item of work etc. complete
TBSP-E.VII-04 Rate as per SSR 287 1 No 449.00 1 Each
Over heads and Contractors profit @ 13.615% 449.00
Rate for Each of 0.6096 m
Rate per 1 Rm
Rate per 1 Rm

29 TBSP-F.VII-06:S & F 32 mm C.P waste coupling and 32mm dia PVC waste pipe including cost an
conveyance of all materials and labour charges for finished item of work etc. complete

TBSP-F.VII-06 Rate for 32mm CP Waste Coupling. 1 No 212.00 1 Sqm


BMW-E.32 Labour charges only 20% 0.00
Rate for 32mm dia Waste pipe. 1 No 26.00 1 Sqm

Over heads and Contractors profit @ 13.615% 238.00

Rate for Each

30 TBSP-B.II-04:Construction of brick masonry support for GI pipe of size 304.80 x 228.60 x 228.60 mm
CM (1:6) prop including plastering with 12mm thick in CM (1:5) prop including all labour charges et
complete for finished item of work.
TBSP-B.II-04 Rate as per SSR 1 No 76.00 1 Each
BMW-I.64 Labour charges only 20% 0.00

Over heads and Contractors profit @ 13.615% 76.00

Rate for Each

31 TBSP-F.VI-01:Providing and fixing of 12.70 mm x 152.00mm CP shower rose heavy 1st quality
approved make including cost and conveyance of all materials to work site all labour chages for fixin
etc. complete(Iron body)
TBSP-F.VI-01 Rate as per SSR S.No.339 1 No 169.00 1 Each
BMW-F.101 Labour charges only 20% 0.00

Over heads and Contractors profit @ 13.615% 169.00

Rate for Each

32 TBSP-F.IV-05:Providing and fixing of concealed stop cock 15 mm mm CP heavy 1st quality


approved make including cost and conveyance of all materials to work site all labour chages for fixin
etc. complete
TBSP-F.IV-05 Rate as per SSR S.No.328 1 No 551.00 1 Each
BMW-E.04 Labour charges only 20% 0.00

Over heads and Contractors profit @ 13.615% 551.00

Rate per 1 No say


Observed Data

data-WS & Sanitary-18-19 447524687.xlsx


Page 986 of 2191

33 TBSP-H.I-01:Supplying and fixing of SWR PVC pipes (as per ISI standards) 4 Kg/Sq.cm. and fixing a
special such as plain bends, off sets, door bends, single junctions, double junctions as per si
requirement, fixing with PVC clamps if necessary with required number of Bombay nails including co
and conveyance of all materials to site, labour charges etc.complete for finished item of work at all flo
levels. (APSS No. 1302 1319 & 1326)

For 75 mm dia per 6 Rmt


TBSP-H.I-01 Cost of PVC pipe (345) - 3 M long 6.00 Rmt 252.00 3 Rmt
Labour charges for laying, fixing and 6.00 Rmt 0.00 1 Rmt
BMW-G.152
commissioning the PVC pipes
TBSP-H.I-19 Cost of PVC pipe (363) - 0.60 M long 2 Nos. 67.00 1 Each
TBSP-H.II-13 Cost of Door bend (516) 1 No. 67.00 1 Each
TBSP-H.II-10 Cost of Plain bend (513) 1 No. 50.00 1 Each
TBSP-H.II-37 Cost of Single Y junction (540) 1 No. 94.00 1 Each
TBSP-H.II-53 Cost of PVC cowl ( 556) 1 No. 14.00 1 Each
TBSP-G.II-21 Cost of PVC clamps (426) 3 Nos. 30.00 1 Each
BMW-F.95 Labour charges 3 Nos. 0.00 1 Each

Over heads and Contractors profit @ 14% 953.00

Rate per 1 RM
say
For 90mm dia per 6 RM
TBSP-H.I-02 Cost of PVC pipe (346) - 3 M long 6.00 Rmt 401.00 3 Rmt
Labour charges for laying, fixing and 6.00 Rmt 0.00 1 Rmt
BMW-G.152
commissioning the PVC pipes
TBSP-H.I-20 Cost of PVC pipe (363) - 0.60 M long 2 Nos. 111.00 1 Each
TBSP-H.II-14 Cost of Door bend (516) 1 No. 94.00 1 Each
TBSP-H.II-11 Cost of Plain bend (513) 1 No. 70.00 1 Each
TBSP-H.II-38 Cost of Single Y junction (540) 1 No. 148.00 1 Each
TBSP-H.II-54 Cost of PVC cowl ( 556) 1 No. 17.00 1 Each
TBSP-G.II-21 Cost of PVC clamps (426) 3 Nos. 30.00 1 Each
BMW-F.96 Labour charges 3 Nos. 0.00 1 Each

Over heads and Contractors profit @ 13.615% 1443.00

Rate per 1 RM
say

For 110mm dia per 6 RM


TBSP-H.I-03 Cost of PVC pipe (347) - 3 M long 6.00 Rmt 479.00 3 Rmt
Labour charges for laying, fixing and 6.00 Rmt 0.00 1 Rmt
BMW-G.152
commissioning the PVC pipes
TBSP-H.I-21 Cost of PVC pipe (364) - 0.60 M long 2 Nos. 139.00 1 Each
TBSP-H.II-15 Cost of Door bend (516) 1 No. 107.00 1 Each
TBSP-H.II-12 Cost of Plain bend (513) 1 No. 83.00 1 Each
TBSP-H.II-39 Cost of Single Y junction (540) 1 No. 170.00 1 Each
TBSP-H.II-55 Cost of PVC cowl ( 556) 1 No. 19.00 1 Each
TBSP-G.II-21 Cost of PVC clamps (426) 3 Nos. 30.00 1 Each
BMW-F.97 Labour charges 3 Nos. 0.00 1 Each

Over heads and Contractors profit @ 13.615% 1705.00

Rate per 1 RM
say
34 TBSP-A.II-43:Supply, delivery and fixing in position of SWG Tee with length of barrel 60 cm for - 300
300 including cost and conveyance of all material and all labour charges etc, complete.

data-WS & Sanitary-18-19 447524687.xlsx


Page 987 of 2191

Supply of SWG Junctions (T's & Y's) conforming 1 No. 1985.00 1 Each
TBSP-A.II-43 to IS standards with length of barrel 60 cm for -
300 x 300
Labour charges for fixing and laying the SWG 1 No. 33.00 1 Each
TBSP-A.III-05 Junctions/ Plugs/ Bends of any dia with airtight
cement joints as per standard practice

Over Heads and Contractors profit @ 13.615% 2018.00


Rate per 1 No

PPR PIPES
35 Supply of 20mm x 2.8mm PN 16/PPR pipe 1.00 RM 60.00 1 RM
TBSP-J.III-22
conforming to DIN Standards 8077/8078
Labour charges for laying, joining, welding, fixing 1.00 RM 34.00 1 RM
and commissioning the PPR pipes including all
specials such as couplers/ bends/ tees etc
TBSP-H.IV-02 including fixing necessary fittings like bends,
plugs, couplers, junctions, tees, etc with welding
the joint as per standard practice - up to 40
mm dia

MA on Labour 20% 34.00

Over Heads and Contractors profit @ 13.615% 100.80


Rate per 1 RM say

data-WS & Sanitary-18-19 447524687.xlsx


Page 988 of 2191

ODADA MUNICIPALITY
ASED ON - 2016 - 2017 SSR
PPLY AND SANITARY ITEMS

Amount
g, jointing and testing 101.6 mm SWG SP-1 pipes of ISI make conforming
t cement joints in CM 1.5:1 prop. Including excavation of trenches and
pt rock requiring blasting) up to 1524 mm(5'0") depth and refilling with

491.00
62.60

553.60
66.85
620.45
620.45

g, jointing and testing 101.6 mm SWG SP-1 pipes of ISI make conforming
t cement joints in CM 1:5:10 prop. including excavation of trenches and
t rock requiring blasting) up to 914.4 mm (3'0") depth and refilling with

423.00
50.40

473.40
64.45
537.85
537.85

g, jointing and testing 152.4 mm SWG SP-1 pipes of ISI make conforming
t cement joints in CM 1.5:10 prop. including excavation of trenches and
pt rock requiring blasting) up to 1524 mm(5'0") depth and refilling with

708.00
62.60

770.60
96.39
866.99
866.99

g, jointing and testing 152.4 mm SWG SP-1 pipes of ISI make conforming
t cement joints in CM 1.5:10 prop. including excavation of trenches and
t rock requiring blasting) up to 914.4 mm (3'0") depth and refilling with

630.00
50.40

680.40
92.64
773.04

data-WS & Sanitary-18-19 447524687.xlsx


Page 989 of 2191

773.04

ng, jointing and testing 152.4 mm CC bed 1:2:4 Prop: using 19.05 mm
hips and cradling 101.6 mm SWG pipe line all round to have 76.2 mm

138.00
0.00
138.00
18.79
156.79
156.79

g, jointing and testing 152.4 mm CC bed 1:2:4 Prop: using 19.05 mm


hips and cradling 152.4 mm SWG pipe line all round to have 76.2 mm

237.00
0.00
237.00
32.27
269.27
269.27

4.0 mm (3’0”) dia solid block masonry inspection chamber as per IS -


t mortar (1:6) prop using fly-ash blocks of 225 mm thick from approved
shing strength of 10 N/sq.mm including plastering with cement mortar 1:3
d outside fitted with 20” dia RCC manhole covers and frames including
of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement
using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm
cation and including cost and conveyance of all materials like cement,
te, cost of seigniorage charges on all materials and all incidental and
ke mixing cement mortar, constructing masonry, lift charges, curing etc.,
ork as per Standard specification.

7338.00
999.07
8337.07
8337.07

4.0 mm (3’0”) dia solid block masonry inspection chamber as per IS -


t mortar (1:6) prop using fly-ash blocks of 225 mm thick from approved
shing strength of 10 N/sq.mm including plastering with cement mortar 1:3
d outside fitted with 20” dia RCC manhole covers and frames including
of 1524 mm (5'-0") in all sorts of soils (excluding rock) and laying cement
using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm
cation and including cost and conveyance of all materials like cement,
te, cost of seigniorage charges on all materials and all incidental and
ke mixing cement mortar, constructing masonry, lift charges, curing etc.,
ork as per Standard specification.

11694.00
1592.14
13286.14
13286.14

data-WS & Sanitary-18-19 447524687.xlsx


Page 990 of 2191

4.0 mm (3’0”) dia brick masonry inspection chamber as per IS - 4111: Part-
:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved
shing strength of 5 N/sq.mm including plastering with cement mortar 1:3
d outside fitted with 20” dia RCC manhole covers and frames including
of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement
using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm
cation and including cost and conveyance of all materials like cement,
te, cost of seigniorage charges on all materials and all incidental and
ke mixing cement mortar, constructing masonry, lift charges, curing etc.,
ork as per Standard specification.

7321.00
996.75
8317.75
8317.75

4.0 mm (3’0”) dia brick masonry inspection chamber as per IS - 4111: Part-
1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved
shing strength of 5 N/sq.mm including plastering with cement mortar 1:3
d outside fitted with 20” dia RCC manhole covers and frames including
of 1524 mm (5'-0") in all sorts of soils (excluding rock) and laying cement
using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm
cation and including cost and conveyance of all materials like cement,
te, cost of seigniorage charges on all materials and all incidental and
ke mixing cement mortar, constructing masonry, lift charges, curing etc.,
ork as per Standard specification.

11649.00
1586.01
13235.01
13235.01

4.4 mm x 457.2 mm (3'0"x1'6") brick in CM 1:6 prop. Masonry Inspection


) and fitted with light weight 914.4 mm x 457.2 mm (3'0"x1'6") C.I frame

6324.00
861.01
7185.01
7185.01

7.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection


") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame

3813.00
519.14
4332.14
4332.14

e connection in the existing inspection chamber including all repairs


130.00
0.00

130.00
17.70
147.70
147.70

data-WS & Sanitary-18-19 447524687.xlsx


Page 991 of 2191

upplying & fixing 150 mm x 100 mm SWG gully traps conforming to ISI
Cost. Brick masonry in CM 1:6 prop. Intermediate chamber and fitted with
C.I Frame and hinged cover
619.00
84.28
703.28
703.28

ixing CI floor traps 1st quality ISI marked conforming to IS:1729-


with white cement as per site requirements with standard
mm (3") and grating size 100 mm dia of weight not less than 4.0 Kgs
326.00
0.00
326.00
44.38
370.38
370.38

xing 23" (584.2mm) long white glazed Indian WC Orissa pan of


P or S trap with brick masonry seat, CC squatting plate and 10 lit capacity
ank of approved make with internal components and fixed with wooden
eer-in-charge with required size nails, 15mm PVC connections 31.75 mm
mm dia long CP bend and 12.70 mm (1/2")NP stop cock, heavy duty (300
an W.C. shall be encased on CC (1:2:4) 6” alround well above the joint to
omplete including cost and conveyance of all materials to site, cost of CC
orage charges etc., complete for finished item of work.

865.00
81.80

271.00
81.00
2089.00

114.40

101.00

0.00
224.00

0.00

63.00
159.00
48.00

0.00
4097.20
557.83
4655.03
4655.03

data-WS & Sanitary-18-19 447524687.xlsx


Page 992 of 2191

xing 23" (584.2mm) long white glazed Indian WC Orissa pan of


P or S trap with brick masonry seat, CC squatting plate as approved by
be encased on CC (1:2:4) 6” alround well above the joint to stop leakage
ding cost and conveyance of all materials to site, cost of CC bed, labour
es etc., complete for finished item of work.

865.00
81.80
271.00
81.00
1298.80
176.83
1475.63
1475.63

white glazed European water closet with variety as approved by


ap with 4" CI outlet pipe of approved make, plastic seat and lid for EWC
548 1963 with and low down porcelain flushing tank with
al components and fixed with wooden gutties with required size nails,
mm PVC connections with brass union nuts and 12.70 mm (1/2")NP stop
), complete including cost and conveyance of all materials to site, for
rs.

1619.00
57.40

734.00
16.60

2089.00

114.40

101.00

0.00
224.00

0.00
159.00
48.00

0.00
5162.40
702.86
5865.26
5865.26

ion and commissioning approved make floor mounted EWC (suit)


p with dual flush porcelain cistern fixed on EWC with all internal parts of
seat cover of approved make with rubber buffer and cap 15 mm angle
C inter connection pipe wall flanges all of approved make etc.
ork in all respects: White Colour

7986.00
1087.29
9073.29
9073.29

data-WS & Sanitary-18-19 447524687.xlsx


Page 993 of 2191

ion and commissioning approved make floor mounted EWC (suit)


p with dual flush porcelain cistern fixed on EWC with all internal parts of
seat cover of approved make with rubber buffer and cap 15 mm angle
C inter connection pipe wall flanges all of approved make etc.
ork in all respects: Coloured - Grade - I/ Grade - II

11672.00
1589.14
13261.14
13261.14

ation and commissioning approved make floor mounted EWC (suit)


p with dual flush porcelain cistern fixed on EWC with all internal parts of
seat cover of approved make with rubber buffer and cap 15 mm angle
C inter connection pipe wall flanges all of approved make etc.
ork in all respects: Special Colour - Grade - III

14866.00
2024.01
16890.01
16890.01

Fixing 660 x 460 mm - Indian make Flat Back Wash Hand Basin
quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber
ize C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and
Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/
alent complete with standard CI brackets including wooden block:

2237.00
1036.00
445.62
3718.62
3718.62

xing 630 x 450 mm - Indian make Flat Back Wash Hand Basin
quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber
ize C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and
Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/
alent complete with standard CI brackets including wooden block:

1981.00
1036.00
410.76
3427.76
3427.76

Fixing 630 x 450 mm Indian make Flat Back Wash Hand Basin
quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber
ize C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and
Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/
lent complete with standard CI brackets including wooden block: -

2428.00
1036.00
471.62
3935.62
3935.62

data-WS & Sanitary-18-19 447524687.xlsx


Page 994 of 2191

Fixing 550 x 400 mm -Indian make Flat Back Wash Hand Basin
quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber
ize C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and
Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/
alent complete with standard CI brackets including wooden block:

1469.00
1036.00
341.06
2846.06
2846.06

Fixing 550 x 400 mm Indian make Flat Back Wash Hand Basin
quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber
ize C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and
Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/
lent complete with standard CI brackets including wooden block: -

1789.00
1036.00
384.62
3209.62
3209.62

Fixing 450 x 300 mm - Indian make Flat Back Wash Hand Basin
quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber
ize C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and
Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/
alent complete with standard CI brackets including wooden block:

1278.00
1036.00
315.05
2629.05
2629.05

xing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer)
56-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal
pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal
ap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or
andard CI brackets including wooden block: 450 x 300 mm - Double

1661.00
1036.00
367.20
3064.20
3064.20

g and commissioning Oval shape basin white glazed 520 x 410mm of


75mm CP bottle trap with extention pipe, 12.70mm single NP pillar cock
32mm dia CP waste coupling, CI brackets, 1 No. 12.7mm NP stop cock
PVC connection with brass union nuts, brass plumber union nuts,
wooden blocks & nails including cost and conveyance of all materials to
ete for finished item of work.

2250.00

data-WS & Sanitary-18-19 447524687.xlsx


Page 995 of 2191

551.00

89.00

26.00
101.00

30.00

3047.00
414.85
3461.85
3461.85

xing white glazed flat back Bowl urinals of size 440 mm x 265 mm x 315
ixed with screws complete,1st quality ISI marked variety, as approved by
VC connections with brass plumber union nuts, S&F of 15 mm brass body
type conforming to IS 1711 1st quality of approved make including 40 mm
cost 76.2 x 101.6 mm teak wood block and conveyance of all materials to
lete for finished item of work for all floors.

767.00
32.60
101.00

0.00
246.00

89.00

48.00

0.00
1283.60
174.76
1458.36
1458.36

xing white glazed flat back half stall urinals of size 410 x 265 x 305
fixed with screws complete,1st quality ISI marked variety, as approved by
PVC connections with brass plumber union nuts, 12.70mm push cock 1st
uding 32mm dia. PVC waste pipe including cost and conveyance of all
s etc., complete for finished item of work for all floors.
2300.00
101.00

0.00
246.00

89.00

48.00

0.00
2784.00
379.04
3163.04
3163.04

data-WS & Sanitary-18-19 447524687.xlsx


Page 996 of 2191

xing white glazed flat back half stall urinals of size 590 x 375 x 390
fixed with screws complete,1st quality ISI marked variety, as approved by
VC connections with brass plumber union nuts, S&F of 15 mm brass body
type conforming to IS 1711 1st quality of approved make including 40 mm
cost 76.2 x 101.6 mm teak wood block and conveyance of all materials to
lete for finished item of work for all floors.

2555.00
101.00

0.00
246.00

89.00

48.00

0.00
3039.00
413.76
3452.76
3452.76

ed squatting type urinal 1st quality ISI marked variety, as approved by


VC connections with brass plumber union nuts, 12.70mm push cock 1st
luding cost and conveyance of all materials to site, labour charges etc.,
ork for all floors.

350.00
101.00

0.00
246.00

697.00
94.90
791.90
791.90

ss steel sink with drain board of size 914.4 mm x 457.2mm, 1mm thick of
ckets with including 32mm C.P. waste coupling, supplying and fixing PVC
ncluding chasing brick masonry wall and making good restoring to original
shed item of work in all floors

6224.00
81.80
89.00
6394.80
870.65
7265.45
7265.45

soap dish heavy type approved make with NP screws etc., complete
of all materials, labour charges for finished item of work in all floors
514.00

69.98

data-WS & Sanitary-18-19 447524687.xlsx


Page 997 of 2191

583.98
584.00

fixing TV shape mirror with plastic frame size 609.6 mm x 457 .2 mm

466.00
0.00
466.00
63.45
529.45
529.45

a 0.60 mtrs. Long aluminium anodized towel rods with brackets etc.,
of all materials, labour charges etc., complete for finished item of work.
149.00
19.80
168.80
22.98
191.78
191.78

overhead shower rose with revolving joint and 150 mm long swivel shower
es. with 7 years warranty: Chrome plated / Jupiter Aqua Lines-JALor
and conveyance of all materials to work site all labour charges for fixing

1361.00
185.30
1546.30
1546.30

ass body CP finish bib tap of not less than 300 grams weight with
er internal or external threaded connection conforming to IS 8931

543.00

73.93
616.93
616.93

brass body CP finish bib tap of not less than 300 grams weight screw
external threaded connection conforming to IS 8931

223.00

0.00
223.00
30.36
253.36
253.36

2914.00
396.74
3310.74

data-WS & Sanitary-18-19 447524687.xlsx


Page 998 of 2191

3310.74

xing of CI pipes ISI marked (IS No. 1729) variety with cement caulked
ch as plug bends, off sets, single junctions, double junctions as per site
black with Japan paint and fixing with necessary wooden blocks fixed in
1) and including fixing of MS clamps if necessary with required number of
and conveyance of all materials to site, labour charges etc.complete for
r levels. (APSS No. 1302 1319 & 1326)

4946.67
49.20
489.00
19.60
403.00
9.80
365.00
15.60
6297.87
629.79
85.75
715.53
715.53

6583.33
49.20
765.00
19.60
489.00

9.80
429.00
15.60
8360.53
836.05
113.83
949.88
949.88

ng A.C Cowls first quality including cost and conveyance of all materials,
ete for finished item of work

44.00
0.00
44.00
5.99
49.99
49.99

65.00
0.00
65.00
8.85

data-WS & Sanitary-18-19 447524687.xlsx


Page 999 of 2191

138.85
138.85
brass body CP finish self closing tap push including cost and
all labour charges etc,.
246.00
10.20
256.20
34.88
291.08
291.08

g GI pipe Medium Grade as per IS 1239 ISI mark in ground or on wall


, bends, reducers, couplings, running joints, union flanges, unions etc.
all types of soils except rock requiring blasting, refilling, chasing masonry
lls & floors to the originals, surface and fixing MS clamps of TW block on
eyance of all materials and labour charges complete for finished item of

166.00
0.00
166.00
22.60
188.60
188.60

190.00
0.00
190.00
25.87
215.87
215.87

250.00
0.00
250.00
34.04
284.04
284.04

347.00
0.00
347.00
47.24
394.24
394.24

392.00
0.00
392.00
53.37
445.37
445.37

data-WS & Sanitary-18-19 447524687.xlsx


Page 1000 of 2191

428.00
0.00
428.00
58.27
486.27
486.27

ominal Bore GI pipe Medium Grade properties & weight as per IS 1239
s tees couplings, nipples, plugs including excavation for trenches and
ete except for GI bends union and GI connectors with checkout and
equivalent

802.00
802.00
109.19
911.19
911.19

ing Gun metal Gate (GM peet) valve as per IS - 778 Class of approved
eyance of all materials & labour charges at all levels in all floors for

577.00
0.00
577.00
78.56
655.56
655.56

778.00
0.00
778.00
105.92
883.92
883.92

1119.00
0.00
1119.00
152.35
1271.35
1271.35

1700.00
0.00
1700.00
231.46
1931.46
1931.46

2297.00

data-WS & Sanitary-18-19 447524687.xlsx


Page 1001 of 2191

0.00
2297.00
312.74
2609.74
2609.74

3365.00
0.00
3365.00
458.14
3823.14
3823.00

5196.00
0.00
5196.00
707.44
5903.44
5903.44

ng Gunmetal (GM) Horizontal Check (Non return) Valve as per IS-778


d type including cost and conveyance of all materials & labour charges at
ng.

426.00
0.00
426.00
58.00
484.00
484.00

623.00
0.00
623.00
84.82
707.82
707.82

973.00
0.00
973.00
132.47
1105.47
1105.47

1428.00
0.00
1428.00
194.42

data-WS & Sanitary-18-19 447524687.xlsx


Page 1002 of 2191

1622.42
1622.42

1981.00
0.00
1981.00
269.71
2250.71
2250.71

ng Gunmetal (GM) Vertical Check (Non return) Valve as per IS-778 I-


ype including cost and conveyance of all materials & labour charges at all
(Bronze)

402.00
0.00
402.00
54.73
456.73
456.73

522.00
0.00
522.00
71.07
593.07
593.07

790.00
0.00
790.00
107.56
897.56
897.56

1088.00
0.00
1088.00
148.13
1236.13
1236.13

1315.00
0.00
1315.00
179.04
1494.04
1494.04

data-WS & Sanitary-18-19 447524687.xlsx


Page 1003 of 2191

2086.00
0.00
2086.00
284.01
2370.01
2370.00

ng Gunmetal (GM) Ball valve with SS Ball and SS Spindle as per IS -


type of approved type including cost and conveyance of all materials &
all floors for following.

188.00
0.00
188.00
25.60
213.60
213.60

273.00
0.00
273.00
37.17
310.17
310.17

384.00
0.00
384.00
52.28
436.28
436.28

681.00
0.00
681.00
92.72
773.72
773.72

937.00
0.00
937.00
127.57
1064.57
1064.57

1408.00
0.00
1408.00

data-WS & Sanitary-18-19 447524687.xlsx


Page 1004 of 2191

191.70
1599.70
1600.00

acing on terrace (at all floor levels)polyetheylene water storage tank with
nd manufacture with cover and suitable locking arrangement and making
utlets and over flow pipes but without fittings and base support for tanks

7.00
0.00
7.00
0.95
7.95
7.95

ing Indian make white glazed vitreous china porcelain sink conforming to
ever brackets with waste fittings like rubber plug, chain, 32 mm nominal
pipe thread conforming to IS:2963-1979 : 600 x 400 x 250 complete for
s.

4087.00
81.80
26.00

4194.80
571.12
4765.92
4765.92

ing Indian make white glazed vitreous china porcelain sink conforming to
ver brackets with waste fittings like rubber plug, chain, 32 mm nominal
ipe thread conforming to IS:2963-1979 : 750 x 450 x 250 etc. complete
oors.

4599.00
81.80
26.00
4706.80
640.83
5347.63
5347.63

ing 609.6 x 457.2 x 254 mm RCC terrazzo finished sink (or constructed
ass plug and chain including CI cantilever brackets etc. complete for
s.

652.00
0.00
26.00
678.00
92.31
770.31
770.31

ing of 20 mm marble partitioins of size 4' 0" x 2' 0" for urinals including
xing, polishing, etc. complete for finished item of work
513.22
36.00
0.00

data-WS & Sanitary-18-19 447524687.xlsx


Page 1005 of 2191

36.00
4.90
40.90
40.90

xing 4" x 24" (101.6x609.6mm) white glazed porcelain channel fixed in


ointing including fixing in CM ( 1 1/2:1) to the required slopes including
terials and labour charges for finished item of work etc. complete
449.00
61.13
510.13
836.83
836.83

C.P waste coupling and 32mm dia PVC waste pipe including cost and
d labour charges for finished item of work etc. complete

212.00
0.00
26.00
238.00
32.40
270.40
270.40

brick masonry support for GI pipe of size 304.80 x 228.60 x 228.60 mm in


ering with 12mm thick in CM (1:5) prop including all labour charges etc.
ork.
76.00
0.00
76.00
10.35
86.35
86.35

xing of 12.70 mm x 152.00mm CP shower rose heavy 1st quality of


and conveyance of all materials to work site all labour chages for fixing

169.00
0.00
169.00
23.01
192.01
192.01

ixing of concealed stop cock 15 mm mm CP heavy 1st quality of


and conveyance of all materials to work site all labour chages for fixing

551.00
0.00
551.00
75.02
626.02
626.02

data-WS & Sanitary-18-19 447524687.xlsx


Page 1006 of 2191

ing of SWR PVC pipes (as per ISI standards) 4 Kg/Sq.cm. and fixing all
, off sets, door bends, single junctions, double junctions as per site
lamps if necessary with required number of Bombay nails including cost
s to site, labour charges etc.complete for finished item of work at all floor
& 1326)

504.00
0.00

134.00
67.00
50.00
94.00
14.00
90.00
0.00
953.00
129.75
1082.75
180.50
180.50

802.00
0.00

222.00
94.00
70.00
148.00
17.00
90.00
0.00
1443.00
196.46
1639.46
273.17
273.17

958.00
0.00

278.00
107.00
83.00
170.00
19.00
90.00
0.00
1705.00
232.14
1937.14
322.83
322.83
and fixing in position of SWG Tee with length of barrel 60 cm for - 300 x
ance of all material and all labour charges etc, complete.

data-WS & Sanitary-18-19 447524687.xlsx


Page 1007 of 2191

1985.00

33.00

2018.00
274.75
2292.75

60.00

34.00

6.80
100.80
13.72
114.52

data-WS & Sanitary-18-19 447524687.xlsx


LEAD CHARGES OF MATERIAL FOR THE YEAR 2018-19
B. ( LEAD) CONVEYANCE CHARGES FOR MACHINERY PER KILOMETER FOR TRANSPORTING MATERIALS BY TIPPERS AND TRUCKS EXCLUDING LOADING,
UNLOADING AND IDLE HIRE CHARGES OF MACHINERY FOR THE YEAR: 2016-17 ( No loading and unloading charges allowed for machinery loading and unloading )
Lead Including 13.615% contractors profit Excluding 13.615% contractors profit
in Km
Gravel, Metal & AC, GI PCC , Bricks- Cement/ Bitumen per Gravel, Metal & AC, GI PCC , Bricks Cement/ Bitumen per MT/Km
Earth & Stone sheets & Shabad 1000 Steel/ MT/Km Earth & Stone sheets & Shabad ( 1000 Steel/
Sand RCC slabs Nos RCC Sand RCC poles slabs Nos) RCC pole
poles pole per Ton
per Ton
Packed Bulk Packed
34.20 33.00 20.60 48.60 20.50 55.10 1.75 1.50
0
1 0.00 0.00 0.00 0.00 0.00 0.00 1.75 1.50 0.00 0.00 0.00 0.00 0.00 0.00 1.54
2 13.70 13.20 8.30 19.40 8.20 22.00 3.50 3.00 12.06 11.62 7.31 17.08 7.22 19.36 3.07
3 29.70 30.90 19.30 45.40 17.80 47.70 5.25 4.50 26.14 27.20 16.99 39.96 15.67 41.98 4.61
4 43.40 44.60 27.90 65.50 25.90 69.70 7.00 6.00 38.20 39.26 24.56 57.65 22.80 61.35 6.14
5 57.10 58.30 36.50 85.70 34.10 91.70 8.75 7.50 50.26 51.31 32.13 75.43 30.01 80.71 7.68
6 70.80 72.00 45.10 105.80 42.30 113.70 10.50 9.00 62.32 63.37 39.70 93.12 37.23 100.07 9.21
7 84.50 85.70 53.70 125.90 50.50 135.70 12.25 10.50 74.37 75.43 47.26 110.81 44.45 119.44 10.75
8 98.20 99.40 62.30 146.00 58.70 157.70 14.00 12.00 86.43 87.49 54.83 128.50 51.67 138.80 12.28
9 111.90 113.10 70.90 166.10 66.90 179.70 15.75 13.50 98.49 99.55 62.40 146.20 58.88 158.17 13.82
10 125.60 126.80 79.50 186.20 75.10 201.70 17.50 15.00 110.55 111.60 69.97 163.89 66.10 177.53 15.35
11 139.30 140.50 88.10 206.30 83.30 223.70 19.25 16.50 122.61 123.66 77.54 181.58 73.32 196.89 16.89
12 153.00 154.20 96.70 226.40 91.50 245.70 21.00 18.00 134.67 135.72 85.11 199.27 80.54 216.26 18.42
13 166.70 167.90 105.30 246.50 99.70 267.70 22.75 19.50 146.72 147.78 92.68 216.96 87.75 235.62 19.96
14 180.40 181.60 113.90 266.60 107.90 289.70 24.50 21.00 158.78 159.84 100.25 234.65 94.97 254.98 21.49
15 194.10 195.30 122.50 286.70 116.10 311.70 26.25 22.50 170.84 171.90 107.82 252.34 102.19 274.35 23.03
16 207.80 209.00 131.10 306.80 124.30 333.70 28.00 24.00 182.90 183.95 115.39 270.03 109.40 293.71 24.56
17 221.50 222.70 139.70 326.90 132.50 355.70 29.75 25.50 194.96 196.01 122.96 287.73 116.62 313.07 26.10
18 235.20 236.40 148.30 347.00 140.70 377.70 31.50 27.00 207.01 208.07 130.53 305.42 123.84 332.44 27.63
19 248.90 250.10 156.90 367.10 148.90 399.70 33.25 28.50 219.07 220.13 138.10 323.11 131.06 351.80 29.17
20 262.60 263.80 165.50 387.20 157.10 421.70 35.00 30.00 231.13 232.19 145.67 340.80 138.27 371.17 30.70
21 276.30 277.50 174.10 407.30 165.30 443.70 36.75 31.50 243.19 244.25 153.24 358.49 145.49 390.53 32.24
22 290.00 291.20 182.70 427.40 173.50 465.70 38.50 33.00 255.25 256.30 160.81 376.18 152.71 409.89 33.77
23 303.70 304.90 191.30 447.50 181.70 487.70 40.25 34.50 267.31 268.36 168.38 393.87 159.93 429.26 35.31
24 317.40 318.60 199.90 467.60 189.90 509.70 42.00 36.00 279.36 280.42 175.95 411.57 167.14 448.62 36.84
Lead Including 13.615% contractors profit Excluding 13.615% contractors profit
in Km
Gravel, Metal & AC, GI PCC , Bricks- Cement/ Bitumen per Gravel, Metal & AC, GI PCC , Bricks Cement/ Bitumen per MT/Km
Earth & Stone sheets & Shabad 1000 Steel/ MT/Km Earth & Stone sheets & Shabad ( 1000 Steel/
Sand RCC slabs Nos RCC Sand RCC poles slabs Nos) RCC pole
poles pole per Ton
per Ton
Packed Bulk Packed
25 331.10 332.30 208.50 487.70 198.10 531.70 43.75 37.50 291.42 292.48 183.51 429.26 174.36 467.98 38.38
26 344.80 346.00 217.10 507.80 206.30 553.70 45.50 39.00 303.48 304.54 191.08 446.95 181.58 487.35 39.91
27 358.50 359.70 225.70 527.90 214.50 575.70 47.25 40.50 315.54 316.60 198.65 464.64 188.80 506.71 41.45
28 372.20 373.40 234.30 548.00 222.70 597.70 49.00 42.00 327.60 328.65 206.22 482.33 196.01 526.07 42.98
29 385.90 387.10 242.90 568.10 230.90 619.70 50.75 43.50 339.66 340.71 213.79 500.02 203.23 545.44 44.52
30 399.60 400.80 251.50 588.20 239.10 641.70 52.50 45.00 351.71 352.77 221.36 517.71 210.45 564.80 46.05
31 411.00 412.20 258.60 605.00 245.90 660.10 54.25 46.50 361.75 362.80 227.61 532.50 216.43 581.00 47.59
32 422.40 423.60 265.70 621.80 252.70 678.50 56.00 48.00 371.78 372.84 233.86 547.29 222.42 597.19 49.12
33 433.80 435.00 272.80 638.60 259.50 696.90 57.75 49.50 381.82 382.87 240.11 562.07 228.40 613.39 50.66
34 445.20 446.40 279.90 655.40 266.30 715.30 59.50 51.00 391.85 392.91 246.36 576.86 234.39 629.58 52.19
35 456.60 457.80 287.00 672.20 273.10 733.70 61.25 52.50 401.88 402.94 252.61 591.65 240.37 645.78 53.73
36 468.00 469.20 294.10 689.00 279.90 752.10 63.00 54.00 411.92 412.97 258.86 606.43 246.36 661.97 55.26
37 479.40 480.60 301.20 705.80 286.70 770.50 64.75 55.50 421.95 423.01 265.11 621.22 252.34 678.17 56.80
38 490.80 492.00 308.30 722.60 293.50 788.90 66.50 57.00 431.99 433.04 271.36 636.01 258.33 694.36 58.33
39 502.20 503.40 315.40 739.40 300.30 807.30 68.25 58.50 442.02 443.08 277.60 650.79 264.31 710.56 59.87
40 513.60 514.80 322.50 756.20 307.10 825.70 70.00 60.00 452.05 453.11 283.85 665.58 270.30 726.75 61.40
41 525.00 526.20 329.60 773.00 313.90 844.10 71.75 61.50 462.09 463.14 290.10 680.37 276.28 742.95 62.94
42 536.40 537.60 336.70 789.80 320.70 862.50 73.50 63.00 472.12 473.18 296.35 695.15 282.27 759.14 64.47
43 547.80 549.00 343.80 806.60 327.50 880.90 75.25 64.50 482.15 483.21 302.60 709.94 288.25 775.34 66.01
44 559.20 560.40 350.90 823.40 334.30 899.30 77.00 66.00 492.19 493.24 308.85 724.73 294.24 791.53 67.54
45 570.60 571.80 358.00 840.20 341.10 917.70 78.75 67.50 502.22 503.28 315.10 739.52 300.22 807.73 69.08
46 582.00 583.20 365.10 857.00 347.90 936.10 80.50 69.00 512.26 513.31 321.35 754.30 306.21 823.92 70.61
47 593.40 594.60 372.20 873.80 354.70 954.50 82.25 70.50 522.29 523.35 327.60 769.09 312.19 840.12 72.15
48 604.80 606.00 379.30 890.60 361.50 972.90 84.00 72.00 532.32 533.38 333.85 783.88 318.18 856.31 73.68
49 616.20 617.40 386.40 907.40 368.30 991.30 85.75 73.50 542.36 543.41 340.10 798.66 324.16 872.51 75.22
50 627.60 628.80 393.50 924.20 375.10 1009.70 87.50 75.00 552.39 553.45 346.35 813.45 330.15 888.70 76.75
51 639.00 640.20 400.60 941.00 381.90 1028.10 89.25 76.50 562.43 563.48 352.59 828.24 336.14 904.90 78.29
52 650.40 651.60 407.70 957.80 388.70 1046.50 91.00 78.00 572.46 573.52 358.84 843.02 342.12 921.09 79.82
53 661.80 663.00 414.80 974.60 395.50 1064.90 92.75 79.50 582.49 583.55 365.09 857.81 348.11 937.29 81.36
54 673.20 674.40 421.90 991.40 402.30 1083.30 94.50 81.00 592.53 593.58 371.34 872.60 354.09 953.48 82.89
Lead Including 13.615% contractors profit Excluding 13.615% contractors profit
in Km
Gravel, Metal & AC, GI PCC , Bricks- Cement/ Bitumen per Gravel, Metal & AC, GI PCC , Bricks Cement/ Bitumen per MT/Km
Earth & Stone sheets & Shabad 1000 Steel/ MT/Km Earth & Stone sheets & Shabad ( 1000 Steel/
Sand RCC slabs Nos RCC Sand RCC poles slabs Nos) RCC pole
poles pole per Ton
per Ton
Packed Bulk Packed
55 684.60 685.80 429.00 1008.20 409.10 1101.70 96.25 82.50 602.56 603.62 377.59 887.38 360.08 969.68 84.43
56 696.00 697.20 436.10 1025.00 415.90 1120.10 98.00 84.00 612.60 613.65 383.84 902.17 366.06 985.87 85.96
57 707.40 708.60 443.20 1041.80 422.70 1138.50 99.75 85.50 622.63 623.69 390.09 916.96 372.05 1002.07 87.50
58 718.80 720.00 450.30 1058.60 429.50 1156.90 101.50 87.00 632.66 633.72 396.34 931.74 378.03 1018.26 89.04
59 730.20 731.40 457.40 1075.40 436.30 1175.30 103.25 88.50 642.70 643.75 402.59 946.53 384.02 1034.46 90.57
60 741.60 742.80 464.50 1092.20 443.10 1193.70 105.00 90.00 652.73 653.79 408.84 961.32 390.00 1050.65 92.11
61 753.00 754.20 471.60 1109.00 449.90 1212.10 106.75 91.50 662.76 663.82 415.09 976.10 395.99 1066.85 93.64
62 764.40 765.60 478.70 1125.80 456.70 1230.50 108.50 93.00 672.80 673.85 421.34 990.89 401.97 1083.04 95.18
63 775.80 777.00 485.80 1142.60 463.50 1248.90 110.25 94.50 682.83 683.89 427.58 1005.68 407.96 1099.24 96.71
64 787.20 788.40 492.90 1159.40 470.30 1267.30 112.00 96.00 692.87 693.92 433.83 1020.46 413.94 1115.43 98.25
65 798.60 799.80 500.00 1176.20 477.10 1285.70 113.75 97.50 702.90 703.96 440.08 1035.25 419.93 1131.63 99.78
66 810.00 811.20 507.10 1193.00 483.90 1304.10 115.50 99.00 712.93 713.99 446.33 1050.04 425.91 1147.82 101.32
67 821.40 822.60 514.20 1209.80 490.70 1322.50 117.25 100.50 722.97 724.02 452.58 1064.82 431.90 1164.02 102.85
68 832.80 834.00 521.30 1226.60 497.50 1340.90 119.00 102.00 733.00 734.06 458.83 1079.61 437.88 1180.21 104.39
69 844.20 845.40 528.40 1243.40 504.30 1359.30 120.75 103.50 743.04 744.09 465.08 1094.40 443.87 1196.41 105.92
70 855.60 856.80 535.50 1260.20 511.10 1377.70 122.50 105.00 753.07 754.13 471.33 1109.18 449.85 1212.60 107.46
71 867.00 868.20 542.60 1277.00 517.90 1396.10 124.25 106.50 763.10 764.16 477.58 1123.97 455.84 1228.80 108.99
72 878.40 879.60 549.70 1293.80 524.70 1414.50 126.00 108.00 773.14 774.19 483.83 1138.76 461.82 1244.99 110.53
73 889.80 891.00 556.80 1310.60 531.50 1432.90 127.75 109.50 783.17 784.23 490.08 1153.54 467.81 1261.19 112.06
74 901.20 902.40 563.90 1327.40 538.30 1451.30 129.50 111.00 793.21 794.26 496.33 1168.33 473.79 1277.38 113.60
75 912.60 913.80 571.00 1344.20 545.10 1469.70 131.25 112.50 803.24 804.30 502.57 1183.12 479.78 1293.58 115.13
76 924.00 925.20 578.10 1361.00 551.90 1488.10 133.00 114.00 813.27 814.33 508.82 1197.91 485.76 1309.77 116.67
77 935.40 936.60 585.20 1377.80 558.70 1506.50 134.75 115.50 823.31 824.36 515.07 1212.69 491.75 1325.97 118.20
78 946.80 948.00 592.30 1394.60 565.50 1524.90 136.50 117.00 833.34 834.40 521.32 1227.48 497.73 1342.16 119.74
79 958.20 959.40 599.40 1411.40 572.30 1543.30 138.25 118.50 843.37 844.43 527.57 1242.27 503.72 1358.36 121.27
80 969.60 970.80 606.50 1428.20 579.10 1561.70 140.00 120.00 853.41 854.46 533.82 1257.05 509.70 1374.55 122.81
81 981.00 982.20 613.60 1445.00 585.90 1580.10 141.75 121.50 863.44 864.50 540.07 1271.84 515.69 1390.75 124.34
82 992.40 993.60 620.70 1461.80 592.70 1598.50 143.50 123.00 873.48 874.53 546.32 1286.63 521.67 1406.94 125.88
83 1003.80 1005.00 627.80 1478.60 599.50 1616.90 145.25 124.50 883.51 884.57 552.57 1301.41 527.66 1423.14 127.41
84 1015.20 1016.40 634.90 1495.40 606.30 1635.30 147.00 126.00 893.54 894.60 558.82 1316.20 533.64 1439.33 128.95
Lead Including 13.615% contractors profit Excluding 13.615% contractors profit
in Km
Gravel, Metal & AC, GI PCC , Bricks- Cement/ Bitumen per Gravel, Metal & AC, GI PCC , Bricks Cement/ Bitumen per MT/Km
Earth & Stone sheets & Shabad 1000 Steel/ MT/Km Earth & Stone sheets & Shabad ( 1000 Steel/
Sand RCC slabs Nos RCC Sand RCC poles slabs Nos) RCC pole
poles pole per Ton
per Ton
Packed Bulk Packed
85 1026.60 1027.80 642.00 1512.20 613.10 1653.70 148.75 127.50 903.58 904.63 565.07 1330.99 539.63 1455.53 130.48
86 1038.00 1039.20 649.10 1529.00 619.90 1672.10 150.50 129.00 913.61 914.67 571.32 1345.77 545.61 1471.72 132.02
87 1049.40 1050.60 656.20 1545.80 626.70 1690.50 152.25 130.50 923.65 924.70 577.56 1360.56 551.60 1487.92 133.55
88 1060.80 1062.00 663.30 1562.60 633.50 1708.90 154.00 132.00 933.68 934.74 583.81 1375.35 557.58 1504.11 135.09
89 1072.20 1073.40 670.40 1579.40 640.30 1727.30 155.75 133.50 943.71 944.77 590.06 1390.13 563.57 1520.31 136.62
90 1083.60 1084.80 677.50 1596.20 647.10 1745.70 157.50 135.00 953.75 954.80 596.31 1404.92 569.56 1536.50 138.16
91 1095.00 1096.20 684.60 1613.00 653.90 1764.10 159.25 136.50 963.78 964.84 602.56 1419.71 575.54 1552.70 139.69
92 1106.40 1107.60 691.70 1629.80 660.70 1782.50 161.00 138.00 973.82 974.87 608.81 1434.49 581.53 1568.89 141.23
93 1117.80 1119.00 698.80 1646.60 667.50 1800.90 162.75 139.50 983.85 984.91 615.06 1449.28 587.51 1585.09 142.76
94 1129.20 1130.40 705.90 1663.40 674.30 1819.30 164.50 141.00 993.88 994.94 621.31 1464.07 593.50 1601.29 144.30
95 1140.60 1141.80 713.00 1680.20 681.10 1837.70 166.25 142.50 1003.92 1004.97 627.56 1478.85 599.48 1617.48 145.83
96 1152.00 1153.20 720.10 1697.00 687.90 1856.10 168.00 144.00 1013.95 1015.01 633.81 1493.64 605.47 1633.68 147.37
97 1163.40 1164.60 727.20 1713.80 694.70 1874.50 169.75 145.50 1023.98 1025.04 640.06 1508.43 611.45 1649.87 148.90
98 1174.80 1176.00 734.30 1730.60 701.50 1892.90 171.50 147.00 1034.02 1035.07 646.31 1523.21 617.44 1666.07 150.44
99 1186.20 1187.40 741.40 1747.40 708.30 1911.30 173.25 148.50 1044.05 1045.11 652.55 1538.00 623.42 1682.26 151.97
100 1197.60 1198.80 748.50 1764.20 715.10 1929.70 175.00 150.00 1054.09 1055.14 658.80 1552.79 629.41 1698.46 153.51
101 1209.00 1210.20 755.60 1781.00 721.90 1948.10 176.75 151.50 1064.12 1065.18 665.05 1567.57 635.39 1714.65 155.04
102 1220.40 1221.60 762.70 1797.80 728.70 1966.50 178.50 153.00 1074.15 1075.21 671.30 1582.36 641.38 1730.85 156.58
103 1231.80 1233.00 769.80 1814.60 735.50 1984.90 180.25 154.50 1084.19 1085.24 677.55 1597.15 647.36 1747.04 158.11
104 1243.20 1244.40 776.90 1831.40 742.30 2003.30 182.00 156.00 1094.22 1095.28 683.80 1611.94 653.35 1763.24 159.65
105 1254.60 1255.80 784.00 1848.20 749.10 2021.70 183.75 157.50 1104.26 1105.31 690.05 1626.72 659.33 1779.43 161.18
106 1266.00 1267.20 791.10 1865.00 755.90 2040.10 185.50 159.00 1114.29 1115.35 696.30 1641.51 665.32 1795.63 162.72
107 1277.40 1278.60 798.20 1881.80 762.70 2058.50 187.25 160.50 1124.32 1125.38 702.55 1656.30 671.30 1811.82 164.25
108 1288.80 1290.00 805.30 1898.60 769.50 2076.90 189.00 162.00 1134.36 1135.41 708.80 1671.08 677.29 1828.02 165.79
109 1300.20 1301.40 812.40 1915.40 776.30 2095.30 190.75 163.50 1144.39 1145.45 715.05 1685.87 683.27 1844.21 167.32
110 1311.60 1312.80 819.50 1932.20 783.10 2113.70 192.50 165.00 1154.43 1155.48 721.30 1700.66 689.26 1860.41 168.86
111 1323.00 1324.20 826.60 1949.00 789.90 2132.10 194.25 166.50 1164.46 1165.52 727.54 1715.44 695.24 1876.60 170.39
112 1334.40 1335.60 833.70 1965.80 796.70 2150.50 196.00 168.00 1174.49 1175.55 733.79 1730.23 701.23 1892.80 171.93
113 1345.80 1347.00 840.80 1982.60 803.50 2168.90 197.75 169.50 1184.53 1185.58 740.04 1745.02 707.21 1908.99 173.46
114 1357.20 1358.40 847.90 1999.40 810.30 2187.30 199.50 171.00 1194.56 1195.62 746.29 1759.80 713.20 1925.19 175.00
Lead Including 13.615% contractors profit Excluding 13.615% contractors profit
in Km
Gravel, Metal & AC, GI PCC , Bricks- Cement/ Bitumen per Gravel, Metal & AC, GI PCC , Bricks Cement/ Bitumen per MT/Km
Earth & Stone sheets & Shabad 1000 Steel/ MT/Km Earth & Stone sheets & Shabad ( 1000 Steel/
Sand RCC slabs Nos RCC Sand RCC poles slabs Nos) RCC pole
poles pole per Ton
per Ton
Packed Bulk Packed
115 1368.60 1369.80 855.00 2016.20 817.10 2205.70 201.25 172.50 1204.59 1205.65 752.54 1774.59 719.18 1941.38 176.54
116 1380.00 1381.20 862.10 2033.00 823.90 2224.10 203.00 174.00 1214.63 1215.68 758.79 1789.38 725.17 1957.58 178.07
117 1391.40 1392.60 869.20 2049.80 830.70 2242.50 204.75 175.50 1224.66 1225.72 765.04 1804.16 731.15 1973.77 179.61
118 1402.80 1404.00 876.30 2066.60 837.50 2260.90 206.50 177.00 1234.70 1235.75 771.29 1818.95 737.14 1989.97 181.14
119 1414.20 1415.40 883.40 2083.40 844.30 2279.30 208.25 178.50 1244.73 1245.79 777.54 1833.74 743.12 2006.16 182.68
120 1425.60 1426.80 890.50 2100.20 851.10 2297.70 210.00 180.00 1254.76 1255.82 783.79 1848.52 749.11 2022.36 184.21
121 1437.00 1438.20 897.60 2117.00 857.90 2316.10 211.75 181.50 1264.80 1265.85 790.04 1863.31 755.09 2038.55 185.75
122 1448.40 1449.60 904.70 2133.80 864.70 2334.50 213.50 183.00 1274.83 1275.89 796.29 1878.10 761.08 2054.75 187.28
123 1459.80 1461.00 911.80 2150.60 871.50 2352.90 215.25 184.50 1284.87 1285.92 802.53 1892.88 767.06 2070.94 188.82
124 1471.20 1472.40 918.90 2167.40 878.30 2371.30 217.00 186.00 1294.90 1295.96 808.78 1907.67 773.05 2087.14 190.35
125 1482.60 1483.80 926.00 2184.20 885.10 2389.70 218.75 187.50 1304.93 1305.99 815.03 1922.46 779.03 2103.33 191.89
125.50 1494.00 1495.20 929.55 2192.60 888.50 2398.90 219.63 188.25 1314.97 1316.02 818.16 1929.85 782.03 2111.43 192.66
126 1499.70 1500.90 933.10 2201.00 891.90 2408.10 220.50 189.00 1319.98 1321.04 821.28 1937.24 785.02 2119.53 193.42
127 1505.40 1506.60 940.20 2217.80 898.70 2426.50 222.25 190.50 1325.00 1326.06 827.53 1952.03 791.00 2135.72 194.96
128 1516.80 1518.00 947.30 2234.60 905.50 2444.90 224.00 192.00 1335.03 1336.09 833.78 1966.82 796.99 2151.92 196.49
129 1528.20 1529.40 954.40 2251.40 912.30 2463.30 225.75 193.50 1345.07 1346.13 840.03 1981.60 802.97 2168.11 198.03
130 1539.60 1540.80 961.50 2268.20 919.10 2481.70 227.50 195.00 1355.10 1356.16 846.28 1996.39 808.96 2184.31 199.56
131 1551.00 1552.20 968.60 2285.00 925.90 2500.10 229.25 196.50 1365.14 1366.19 852.53 2011.18 814.95 2200.50 201.10
132 1562.40 1563.60 975.70 2301.80 932.70 2518.50 231.00 198.00 1375.17 1376.23 858.78 2025.96 820.93 2216.70 202.63
133 1573.80 1575.00 982.80 2318.60 939.50 2536.90 232.75 199.50 1385.20 1386.26 865.03 2040.75 826.92 2232.89 204.17
134 1585.20 1586.40 989.90 2335.40 946.30 2555.30 234.50 201.00 1395.24 1396.29 871.28 2055.54 832.90 2249.09 205.70
135 1596.60 1597.80 997.00 2352.20 953.10 2573.70 236.25 202.50 1405.27 1406.33 877.52 2070.33 838.89 2265.28 207.24
136 1608.00 1609.20 1004.10 2369.00 959.90 2592.10 238.00 204.00 1415.31 1416.36 883.77 2085.11 844.87 2281.48 208.77
137 1619.40 1620.60 1011.20 2385.80 966.70 2610.50 239.75 205.50 1425.34 1426.40 890.02 2099.90 850.86 2297.67 210.31
138 1630.80 1632.00 1018.30 2402.60 973.50 2628.90 241.50 207.00 1435.37 1436.43 896.27 2114.69 856.84 2313.87 211.84
139 1642.20 1643.40 1025.40 2419.40 980.30 2647.30 243.25 208.50 1445.41 1446.46 902.52 2129.47 862.83 2330.06 213.38
140 1653.60 1654.80 1032.50 2436.20 987.10 2665.70 245.00 210.00 1455.44 1456.50 908.77 2144.26 868.81 2346.26 214.91
141 1665.00 1666.20 1039.60 2453.00 993.90 2684.10 246.75 211.50 1465.48 1466.53 915.02 2159.05 874.80 2362.45 216.45
142 1676.40 1677.60 1046.70 2469.80 1000.70 2702.50 248.50 213.00 1475.51 1476.57 921.27 2173.83 880.78 2378.65 217.98
143 1687.80 1689.00 1053.80 2486.60 1007.50 2720.90 250.25 214.50 1485.54 1486.60 927.52 2188.62 886.77 2394.84 219.52
Lead Including 13.615% contractors profit Excluding 13.615% contractors profit
in Km
Gravel, Metal & AC, GI PCC , Bricks- Cement/ Bitumen per Gravel, Metal & AC, GI PCC , Bricks Cement/ Bitumen per MT/Km
Earth & Stone sheets & Shabad 1000 Steel/ MT/Km Earth & Stone sheets & Shabad ( 1000 Steel/
Sand RCC slabs Nos RCC Sand RCC poles slabs Nos) RCC pole
poles pole per Ton
per Ton
Packed Bulk Packed
144 1699.20 1700.40 1060.90 2503.40 1014.30 2739.30 252.00 216.00 1495.58 1496.63 933.77 2203.41 892.75 2411.04 221.05
145 1710.60 1711.80 1068.00 2520.20 1021.10 2757.70 253.75 217.50 1505.61 1506.67 940.02 2218.19 898.74 2427.23 222.59
146 1722.00 1723.20 1075.10 2537.00 1027.90 2776.10 255.50 219.00 1515.64 1516.70 946.27 2232.98 904.72 2443.43 224.12
147 1733.40 1734.60 1082.20 2553.80 1034.70 2794.50 257.25 220.50 1525.68 1526.74 952.52 2247.77 910.71 2459.62 225.66
148 1744.80 1746.00 1089.30 2570.60 1041.50 2812.90 259.00 222.00 1535.71 1536.77 958.76 2262.55 916.69 2475.82 227.19
149 1756.20 1757.40 1096.40 2587.40 1048.30 2831.30 260.75 223.50 1545.75 1546.80 965.01 2277.34 922.68 2492.01 228.73
150 1767.60 1768.80 1103.50 2604.20 1055.10 2849.70 262.50 225.00 1555.78 1556.84 971.26 2292.13 928.66 2508.21 230.26
151 1779.00 1780.20 1110.60 2621.00 1061.90 2868.10 264.25 226.50 1565.81 1566.87 977.51 2306.91 934.65 2524.40 231.80
152 1790.40 1791.60 1117.70 2637.80 1068.70 2886.50 266.00 228.00 1575.85 1576.90 983.76 2321.70 940.63 2540.60 233.33
153 1801.80 1803.00 1124.80 2654.60 1075.50 2904.90 267.75 229.50 1585.88 1586.94 990.01 2336.49 946.62 2556.79 234.87
154 1813.20 1814.40 1131.90 2671.40 1082.30 2923.30 269.50 231.00 1595.92 1596.97 996.26 2351.27 952.60 2572.99 236.40
155 1824.60 1825.80 1139.00 2688.20 1089.10 2941.70 271.25 232.50 1605.95 1607.01 1002.51 2366.06 958.59 2589.18 237.94
156 1836.00 1837.20 1146.10 2705.00 1095.90 2960.10 273.00 234.00 1615.98 1617.04 1008.76 2380.85 964.57 2605.38 239.47
157 1847.40 1848.60 1153.20 2721.80 1102.70 2978.50 274.75 235.50 1626.02 1627.07 1015.01 2395.63 970.56 2621.57 241.01
158 1858.80 1860.00 1160.30 2738.60 1109.50 2996.90 276.50 237.00 1636.05 1637.11 1021.26 2410.42 976.54 2637.77 242.54
159 1870.20 1871.40 1167.40 2755.40 1116.30 3015.30 278.25 238.50 1646.09 1647.14 1027.51 2425.21 982.53 2653.96 244.08
160 1881.60 1882.80 1174.50 2772.20 1123.10 3033.70 280.00 240.00 1656.12 1657.18 1033.75 2439.99 988.51 2670.16 245.61
161 1893.00 1894.20 1181.60 2789.00 1129.90 3052.10 281.75 241.50 1666.15 1667.21 1040.00 2454.78 994.50 2686.35 247.15
162 1904.40 1905.60 1188.70 2805.80 1136.70 3070.50 283.50 243.00 1676.19 1677.24 1046.25 2469.57 1000.48 2702.55 248.68
163 1915.80 1917.00 1195.80 2822.60 1143.50 3088.90 285.25 244.50 1686.22 1687.28 1052.50 2484.36 1006.47 2718.74 250.22
164 1927.20 1928.40 1202.90 2839.40 1150.30 3107.30 287.00 246.00 1696.25 1697.31 1058.75 2499.14 1012.45 2734.94 251.75
165 1938.60 1939.80 1210.00 2856.20 1157.10 3125.70 288.75 247.50 1706.29 1707.34 1065.00 2513.93 1018.44 2751.13 253.29
166 1950.00 1951.20 1217.10 2873.00 1163.90 3144.10 290.50 249.00 1716.32 1717.38 1071.25 2528.72 1024.42 2767.33 254.82
167 1961.40 1962.60 1224.20 2889.80 1170.70 3162.50 292.25 250.50 1726.36 1727.41 1077.50 2543.50 1030.41 2783.52 256.36
168 1972.80 1974.00 1231.30 2906.60 1177.50 3180.90 294.00 252.00 1736.39 1737.45 1083.75 2558.29 1036.39 2799.72 257.89
169 1984.20 1985.40 1238.40 2923.40 1184.30 3199.30 295.75 253.50 1746.42 1747.48 1090.00 2573.08 1042.38 2815.91 259.43
170 1995.60 1996.80 1245.50 2940.20 1191.10 3217.70 297.50 255.00 1756.46 1757.51 1096.25 2587.86 1048.37 2832.11 260.96
171 2007.00 2008.20 1252.60 2957.00 1197.90 3236.10 299.25 256.50 1766.49 1767.55 1102.50 2602.65 1054.35 2848.30 262.50
172 2018.40 2019.60 1259.70 2973.80 1204.70 3254.50 301.00 258.00 1776.53 1777.58 1108.74 2617.44 1060.34 2864.50 264.04
173 2029.80 2031.00 1266.80 2990.60 1211.50 3272.90 302.75 259.50 1786.56 1787.62 1114.99 2632.22 1066.32 2880.69 265.57
Lead Including 13.615% contractors profit Excluding 13.615% contractors profit
in Km
Gravel, Metal & AC, GI PCC , Bricks- Cement/ Bitumen per Gravel, Metal & AC, GI PCC , Bricks Cement/ Bitumen per MT/Km
Earth & Stone sheets & Shabad 1000 Steel/ MT/Km Earth & Stone sheets & Shabad ( 1000 Steel/
Sand RCC slabs Nos RCC Sand RCC poles slabs Nos) RCC pole
poles pole per Ton
per Ton
Packed Bulk Packed
174 2041.20 2042.40 1273.90 3007.40 1218.30 3291.30 304.50 261.00 1796.59 1797.65 1121.24 2647.01 1072.31 2896.89 267.11
175 2052.60 2053.80 1281.00 3024.20 1225.10 3309.70 306.25 262.50 1806.63 1807.68 1127.49 2661.80 1078.29 2913.08 268.64
176 2064.00 2065.20 1288.10 3041.00 1231.90 3328.10 308.00 264.00 1816.66 1817.72 1133.74 2676.58 1084.28 2929.28 270.18
177 2075.40 2076.60 1295.20 3057.80 1238.70 3346.50 309.75 265.50 1826.70 1827.75 1139.99 2691.37 1090.26 2945.47 271.71
178 2086.80 2088.00 1302.30 3074.60 1245.50 3364.90 311.50 267.00 1836.73 1837.79 1146.24 2706.16 1096.25 2961.67 273.25
179 2098.20 2099.40 1309.40 3091.40 1252.30 3383.30 313.25 268.50 1846.76 1847.82 1152.49 2720.94 1102.23 2977.86 274.78
180 2109.60 2110.80 1316.50 3108.20 1259.10 3401.70 315.00 270.00 1856.80 1857.85 1158.74 2735.73 1108.22 2994.06 276.32
181 2121.00 2122.20 1323.60 3125.00 1265.90 3420.10 316.75 271.50 1866.83 1867.89 1164.99 2750.52 1114.20 3010.25 277.85
182 2132.40 2133.60 1330.70 3141.80 1272.70 3438.50 318.50 273.00 1876.86 1877.92 1171.24 2765.30 1120.19 3026.45 279.39
183 2143.80 2145.00 1337.80 3158.60 1279.50 3456.90 320.25 274.50 1886.90 1887.95 1177.49 2780.09 1126.17 3042.64 280.92
184 2155.20 2156.40 1344.90 3175.40 1286.30 3475.30 322.00 276.00 1896.93 1897.99 1183.73 2794.88 1132.16 3058.84 282.46
185 2166.60 2167.80 1352.00 3192.20 1293.10 3493.70 323.75 277.50 1906.97 1908.02 1189.98 2809.66 1138.14 3075.03 283.99
186 2178.00 2179.20 1359.10 3209.00 1299.90 3512.10 325.50 279.00 1917.00 1918.06 1196.23 2824.45 1144.13 3091.23 285.53
187 2189.40 2190.60 1366.20 3225.80 1306.70 3530.50 327.25 280.50 1927.03 1928.09 1202.48 2839.24 1150.11 3107.42 287.06
188 2200.80 2202.00 1373.30 3242.60 1313.50 3548.90 329.00 282.00 1937.07 1938.12 1208.73 2854.02 1156.10 3123.62 288.60
189 2212.20 2213.40 1380.40 3259.40 1320.30 3567.30 330.75 283.50 1947.10 1948.16 1214.98 2868.81 1162.08 3139.81 290.13
190 2223.60 2224.80 1387.50 3276.20 1327.10 3585.70 332.50 285.00 1957.14 1958.19 1221.23 2883.60 1168.07 3156.01 291.67
191 2235.00 2236.20 1394.60 3293.00 1333.90 3604.10 334.25 286.50 1967.17 1968.23 1227.48 2898.38 1174.05 3172.20 293.20
192 2246.40 2247.60 1401.70 3309.80 1340.70 3622.50 336.00 288.00 1977.20 1978.26 1233.73 2913.17 1180.04 3188.40 294.74
193 2257.80 2259.00 1408.80 3326.60 1347.50 3640.90 337.75 289.50 1987.24 1988.29 1239.98 2927.96 1186.02 3204.59 296.27
194 2269.20 2270.40 1415.90 3343.40 1354.30 3659.30 339.50 291.00 1997.27 1998.33 1246.23 2942.75 1192.01 3220.79 297.81
195 2280.60 2281.80 1423.00 3360.20 1361.10 3677.70 341.25 292.50 2007.31 2008.36 1252.48 2957.53 1197.99 3236.98 299.34
196 2292.00 2293.20 1430.10 3377.00 1367.90 3696.10 343.00 294.00 2017.34 2018.40 1258.72 2972.32 1203.98 3253.18 300.88
197 2303.40 2304.60 1437.20 3393.80 1374.70 3714.50 344.75 295.50 2027.37 2028.43 1264.97 2987.11 1209.96 3269.37 302.41
198 2314.80 2316.00 1444.30 3410.60 1381.50 3732.90 346.50 297.00 2037.41 2038.46 1271.22 3001.89 1215.95 3285.57 303.95
199 2326.20 2327.40 1451.40 3427.40 1388.30 3751.30 348.25 298.50 2047.44 2048.50 1277.47 3016.68 1221.93 3301.76 305.48
200 2337.60 2338.80 1458.50 3444.20 1395.10 3769.70 350.00 300.00 2057.47 2058.53 1283.72 3031.47 1227.92 3317.96 307.02
201 2349.00 2350.20 1465.60 3461.00 1401.90 3788.10 351.75 301.50 2067.51 2068.56 1289.97 3046.25 1233.90 3334.15 308.55
202 2360.40 2361.60 1472.70 3477.80 1408.70 3806.50 353.50 303.00 2077.54 2078.60 1296.22 3061.04 1239.89 3350.35 310.09
203 2371.80 2373.00 1479.80 3494.60 1415.50 3824.90 355.25 304.50 2087.58 2088.63 1302.47 3075.83 1245.87 3366.54 311.62
Lead Including 13.615% contractors profit Excluding 13.615% contractors profit
in Km
Gravel, Metal & AC, GI PCC , Bricks- Cement/ Bitumen per Gravel, Metal & AC, GI PCC , Bricks Cement/ Bitumen per MT/Km
Earth & Stone sheets & Shabad 1000 Steel/ MT/Km Earth & Stone sheets & Shabad ( 1000 Steel/
Sand RCC slabs Nos RCC Sand RCC poles slabs Nos) RCC pole
poles pole per Ton
per Ton
Packed Bulk Packed
204 2383.20 2384.40 1486.90 3511.40 1422.30 3843.30 357.00 306.00 2097.61 2098.67 1308.72 3090.61 1251.86 3382.74 313.16
205 2394.60 2395.80 1494.00 3528.20 1429.10 3861.70 358.75 307.50 2107.64 2108.70 1314.97 3105.40 1257.84 3398.93 314.69
206 2406.00 2407.20 1501.10 3545.00 1435.90 3880.10 360.50 309.00 2117.68 2118.73 1321.22 3120.19 1263.83 3415.13 316.23
207 2417.40 2418.60 1508.20 3561.80 1442.70 3898.50 362.25 310.50 2127.71 2128.77 1327.47 3134.97 1269.81 3431.33 317.76
208 2428.80 2430.00 1515.30 3578.60 1449.50 3916.90 364.00 312.00 2137.75 2138.80 1333.71 3149.76 1275.80 3447.52 319.30
209 2440.20 2441.40 1522.40 3595.40 1456.30 3935.30 365.75 313.50 2147.78 2148.84 1339.96 3164.55 1281.78 3463.72 320.83
210 2451.60 2452.80 1529.50 3612.20 1463.10 3953.70 367.50 315.00 2157.81 2158.87 1346.21 3179.33 1287.77 3479.91 322.37
211 2463.00 2464.20 1536.60 3629.00 1469.90 3972.10 369.25 316.50 2167.85 2168.90 1352.46 3194.12 1293.76 3496.11 323.90
212 2474.40 2475.60 1543.70 3645.80 1476.70 3990.50 371.00 318.00 2177.88 2178.94 1358.71 3208.91 1299.74 3512.30 325.44
213 2485.80 2487.00 1550.80 3662.60 1483.50 4008.90 372.75 319.50 2187.92 2188.97 1364.96 3223.69 1305.73 3528.50 326.97
214 2497.20 2498.40 1557.90 3679.40 1490.30 4027.30 374.50 321.00 2197.95 2199.01 1371.21 3238.48 1311.71 3544.69 328.51
215 2508.60 2509.80 1565.00 3696.20 1497.10 4045.70 376.25 322.50 2207.98 2209.04 1377.46 3253.27 1317.70 3560.89 330.04
216 2520.00 2521.20 1572.10 3713.00 1503.90 4064.10 378.00 324.00 2218.02 2219.07 1383.71 3268.05 1323.68 3577.08 331.58
217 2531.40 2532.60 1579.20 3729.80 1510.70 4082.50 379.75 325.50 2228.05 2229.11 1389.96 3282.84 1329.67 3593.28 333.11
218 2542.80 2544.00 1586.30 3746.60 1517.50 4100.90 381.50 327.00 2238.08 2239.14 1396.21 3297.63 1335.65 3609.47 334.65
219 2554.20 2555.40 1593.40 3763.40 1524.30 4119.30 383.25 328.50 2248.12 2249.17 1402.46 3312.41 1341.64 3625.67 336.18
220 2565.60 2566.80 1600.50 3780.20 1531.10 4137.70 385.00 330.00 2258.15 2259.21 1408.70 3327.20 1347.62 3641.86 337.72
221 2577.00 2578.20 1607.60 3797.00 1537.90 4156.10 386.75 331.50 2268.19 2269.24 1414.95 3341.99 1353.61 3658.06 339.25
222 2588.40 2589.60 1614.70 3813.80 1544.70 4174.50 388.50 333.00 2278.22 2279.28 1421.20 3356.78 1359.59 3674.25 340.79
223 2599.80 2601.00 1621.80 3830.60 1551.50 4192.90 390.25 334.50 2288.25 2289.31 1427.45 3371.56 1365.58 3690.45 342.32
224 2611.20 2612.40 1628.90 3847.40 1558.30 4211.30 392.00 336.00 2298.29 2299.34 1433.70 3386.35 1371.56 3706.64 343.86
225 2622.60 2623.80 1636.00 3864.20 1565.10 4229.70 393.75 337.50 2308.32 2309.38 1439.95 3401.14 1377.55 3722.84 345.39
226 2634.00 2635.20 1643.10 3881.00 1571.90 4248.10 395.50 339.00 2318.36 2319.41 1446.20 3415.92 1383.53 3739.03 346.93
227 2645.40 2646.60 1650.20 3897.80 1578.70 4266.50 397.25 340.50 2328.39 2329.45 1452.45 3430.71 1389.52 3755.23 348.46
228 2656.80 2658.00 1657.30 3914.60 1585.50 4284.90 399.00 342.00 2338.42 2339.48 1458.70 3445.50 1395.50 3771.42 350.00
229 2668.20 2669.40 1664.40 3931.40 1592.30 4303.30 400.75 343.50 2348.46 2349.51 1464.95 3460.28 1401.49 3787.62 351.54
230 2679.60 2680.80 1671.50 3948.20 1599.10 4321.70 402.50 345.00 2358.49 2359.55 1471.20 3475.07 1407.47 3803.81 353.07
231 2691.00 2692.20 1678.60 3965.00 1605.90 4340.10 404.25 346.50 2368.53 2369.58 1477.45 3489.86 1413.46 3820.01 354.61
232 2702.40 2703.60 1685.70 3981.80 1612.70 4358.50 406.00 348.00 2378.56 2379.62 1483.69 3504.64 1419.44 3836.20 356.14
233 2713.80 2715.00 1692.80 3998.60 1619.50 4376.90 407.75 349.50 2388.59 2389.65 1489.94 3519.43 1425.43 3852.40 357.68
Lead Including 13.615% contractors profit Excluding 13.615% contractors profit
in Km
Gravel, Metal & AC, GI PCC , Bricks- Cement/ Bitumen per Gravel, Metal & AC, GI PCC , Bricks Cement/ Bitumen per MT/Km
Earth & Stone sheets & Shabad 1000 Steel/ MT/Km Earth & Stone sheets & Shabad ( 1000 Steel/
Sand RCC slabs Nos RCC Sand RCC poles slabs Nos) RCC pole
poles pole per Ton
per Ton
Packed Bulk Packed
234 2725.20 2726.40 1699.90 4015.40 1626.30 4395.30 409.50 351.00 2398.63 2399.68 1496.19 3534.22 1431.41 3868.59 359.21
235 2736.60 2737.80 1707.00 4032.20 1633.10 4413.70 411.25 352.50 2408.66 2409.72 1502.44 3549.00 1437.40 3884.79 360.75
236 2748.00 2749.20 1714.10 4049.00 1639.90 4432.10 413.00 354.00 2418.69 2419.75 1508.69 3563.79 1443.38 3900.98 362.28
237 2759.40 2760.60 1721.20 4065.80 1646.70 4450.50 414.75 355.50 2428.73 2429.78 1514.94 3578.58 1449.37 3917.18 363.82
238 2770.80 2772.00 1728.30 4082.60 1653.50 4468.90 416.50 357.00 2438.76 2439.82 1521.19 3593.36 1455.35 3933.37 365.35
239 2782.20 2783.40 1735.40 4099.40 1660.30 4487.30 418.25 358.50 2448.80 2449.85 1527.44 3608.15 1461.34 3949.57 366.89
240 2793.60 2794.80 1742.50 4116.20 1667.10 4505.70 420.00 360.00 2458.83 2459.89 1533.69 3622.94 1467.32 3965.76 368.42
241 2805.00 2806.20 1749.60 4133.00 1673.90 4524.10 421.75 361.50 2468.86 2469.92 1539.94 3637.72 1473.31 3981.96 369.96
242 2816.40 2817.60 1756.70 4149.80 1680.70 4542.50 423.50 363.00 2478.90 2479.95 1546.19 3652.51 1479.29 3998.15 371.49
243 2827.80 2829.00 1763.80 4166.60 1687.50 4560.90 425.25 364.50 2488.93 2489.99 1552.44 3667.30 1485.28 4014.35 373.03
244 2839.20 2840.40 1770.90 4183.40 1694.30 4579.30 427.00 366.00 2498.97 2500.02 1558.69 3682.08 1491.26 4030.54 374.56
245 2850.60 2851.80 1778.00 4200.20 1701.10 4597.70 428.75 367.50 2509.00 2510.06 1564.93 3696.87 1497.25 4046.74 376.10
246 2862.00 2863.20 1785.10 4217.00 1707.90 4616.10 430.50 369.00 2519.03 2520.09 1571.18 3711.66 1503.23 4062.93 377.63
247 2873.40 2874.60 1792.20 4233.80 1714.70 4634.50 432.25 370.50 2529.07 2530.12 1577.43 3726.44 1509.22 4079.13 379.17
248 2884.80 2886.00 1799.30 4250.60 1721.50 4652.90 434.00 372.00 2539.10 2540.16 1583.68 3741.23 1515.20 4095.32 380.70
249 2896.20 2897.40 1806.40 4267.40 1728.30 4671.30 435.75 373.50 2549.14 2550.19 1589.93 3756.02 1521.19 4111.52 382.24
250 2907.60 2908.80 1813.50 4284.20 1735.10 4689.70 437.50 375.00 2559.17 2560.23 1596.18 3770.80 1527.18 4127.71 383.77
251 2919.00 2920.20 1820.60 4301.00 1741.90 4708.10 439.25 376.50 2569.20 2570.26 1602.43 3785.59 1533.16 4143.91 385.31
252 2930.40 2931.60 1827.70 4317.80 1748.70 4726.50 441.00 378.00 2579.24 2580.29 1608.68 3800.38 1539.15 4160.10 386.84
253 2941.80 2943.00 1834.80 4334.60 1755.50 4744.90 442.75 379.50 2589.27 2590.33 1614.93 3815.17 1545.13 4176.30 388.38
254 2953.20 2954.40 1841.90 4351.40 1762.30 4763.30 444.50 381.00 2599.30 2600.36 1621.18 3829.95 1551.12 4192.49 389.91
255 2964.60 2965.80 1849.00 4368.20 1769.10 4781.70 446.25 382.50 2609.34 2610.39 1627.43 3844.74 1557.10 4208.69 391.45
256 2976.00 2977.20 1856.10 4385.00 1775.90 4800.10 448.00 384.00 2619.37 2620.43 1633.68 3859.53 1563.09 4224.88 392.98
SSR.Pg.389/20

Note : The basic item rates provided in the schedule of rates include 50 m (conveyance by manual means) or 1 km (conveyance by mechanical means) as initial lead and no lead
charges shall be allowed where the source of material is within the initial lead specified in item rate. Additional lead charges shall be allowed for the lead exceeding initial lead
specified in the item rate
LOADING,
d unloading )

men per MT/Km

Bulk

1.32
2.63
3.95
5.26
6.58
7.89
9.21
10.53
11.84
13.16
14.47
15.79
17.11
18.42
19.74
21.05
22.37
23.68
25.00
26.32
27.63
28.95
30.26
31.58
men per MT/Km

Bulk
32.89
34.21
35.53
36.84
38.16
39.47
40.79
42.11
43.42
44.74
46.05
47.37
48.68
50.00
51.32
52.63
53.95
55.26
56.58
57.89
59.21
60.53
61.84
63.16
64.47
65.79
67.11
68.42
69.74
71.05
men per MT/Km

Bulk
72.37
73.68
75.00
76.32
77.63
78.95
80.26
81.58
82.89
84.21
85.53
86.84
88.16
89.47
90.79
92.11
93.42
94.74
96.05
97.37
98.68
100.00
101.32
102.63
103.95
105.26
106.58
107.89
109.21
110.53
men per MT/Km

Bulk
111.84
113.16
114.47
115.79
117.11
118.42
119.74
121.05
122.37
123.68
125.00
126.32
127.63
128.95
130.26
131.58
132.89
134.21
135.53
136.84
138.16
139.47
140.79
142.11
143.42
144.74
146.05
147.37
148.68
150.00
men per MT/Km

Bulk
151.32
152.63
153.95
155.26
156.58
157.89
159.21
160.53
161.84
163.16
164.47
165.13
165.79
167.11
168.42
169.74
171.05
172.37
173.68
175.00
176.32
177.63
178.95
180.26
181.58
182.89
184.21
185.53
186.84
188.16
men per MT/Km

Bulk
189.47
190.79
192.11
193.42
194.74
196.05
197.37
198.68
200.00
201.32
202.63
203.95
205.26
206.58
207.89
209.21
210.53
211.84
213.16
214.47
215.79
217.11
218.42
219.74
221.05
222.37
223.68
225.00
226.32
227.63
men per MT/Km

Bulk
228.95
230.26
231.58
232.89
234.21
235.53
236.84
238.16
239.47
240.79
242.11
243.42
244.74
246.05
247.37
248.68
250.00
251.32
252.63
253.95
255.26
256.58
257.89
259.21
260.53
261.84
263.16
264.47
265.79
267.11
men per MT/Km

Bulk
268.42
269.74
271.05
272.37
273.68
275.00
276.32
277.63
278.95
280.26
281.58
282.89
284.21
285.53
286.84
288.16
289.47
290.79
292.11
293.42
294.74
296.05
297.37
298.68
300.00
301.32
302.63
303.95
305.26
306.58
men per MT/Km

Bulk
307.89
309.21
310.53
311.84
313.16
314.47
315.79
317.11
318.42
319.74
321.05
322.37
323.68
325.00
326.32
327.63
328.95
330.26
331.58
332.89
334.21
335.53
336.84

ead and no lead


eding initial lead
DATA - BORE WELLS AND PUMP SETS

Rates as per RC Agreement No. TO/08/2011-12, Dt.03.08.2010

Sl.
No
Description Qty Rate Unit Amount

1 Drilling of Bore well by down the hole hammer (DTH) drilling to finished dia of 163 mm in all formations to the
depth specified and reaming the bores to the required dia flushing the bore walls at an average pressure of 7
kg/cm2 (100 PSI) conducting yield test, inclusive of transportation from point to point, crew charges, cost of
consumables, shifting of Rig and all other charges etc,.The bore wells should be true & vertical and work should be
carried out to the satisfaction of the department and carried out as per IS 2800 I & II / 1979 and amendments if
any from time to time, the rate is including all taxes etc,. complete as applicable.

Rate as per the Rate contract by the SE (RWS) RR District vide Agreement No. TO/08/2011-12, Dt.03.08.2010
Rate up to 90.00 Mts. Depth 1 Rmt 305.00 1 Rmt 305.00
for every 1.00m length after 90.00m @10% extra 1.1 Rmt 305.00 1 Rmt 335.50
2 Supply and fixing of 180 mm dia PVC casing pipe 6kg/cm2 including cost and conveyance of all materials, labour
charges etc., complete for finished item of works.

Rate worked out as per 2009-10 SSR 1 Rmt 574.80 1 Rmt 574.80
3 Supply and delivery,of submersible pumpsets suitable to 150mm dia
Borewell coupled with motors Single phase 2880 RPM 340V(-15%+10%
range-290 to 375 Volts) / 3 Phase 2880 RPM 400V(-15%+10% range-340
to 440 Volts) of reputed make with minimum overall efficiency of 40% at
the duty point with Radial / mixed flow with a trail run of One week.The
pumpset should confirm to IS 8034/2002 & 9283/1995 with up to date
amendments with ISI mark and a guarantee period of 18 months from the
date of installation. The rates are inclusive of , transportation, installation,
errection of pumpsets but excluding APGST, duties and accessories etc,
complete.

Rate as per RC & separate sheet enclosed


4 Supply and delivery of wall mounted Industrial type Control panel board of
size 600x600x250mm made of 18 SWG CRCA sheet steel enclosure, 14
SWG mounting palte for cable entry fabricated, painted with two coats of
red Oxide primer and two coats of final light Grey paint, lock and key
arrangements two side lovures with weld mesh inside etc., completed
consisting of the follwing equipment with all internal wiring using Fine
cab.Finolex cables of suitable size and capacity and cable clamps etc.,
complete for 3-phase power pumps of 415 V-50 HZ for delivery at any
where in A.P.
a). Volt Meter : 0-500 V 96x96mm size 1 No.
b).Ammeter: 0-20 A-1- No.(96x96mm size) upto 7.50HP - 1 No
c), Dry running preventor with elecytrode of suitable range 1 No.
d). Single phasing preventor 1 No.
e). Swith fuse unit with HRC fuses IP & N confirming to IS 4064- 1 set ( 32
AMPS up to 7.5 HP)
f). Indication Lamps(R-Y-B) with dropper resistance 230V-1 set.
g) Holder with Switch controle - 1 No.
h).Voltmeter selector switch - 1 No.
i). Starters-direct-on-line starter in sheet steel enclosure suitable upto
7.50HP motor rating Ac-3-duty,415V,50Hz 3 phase.
j). Supply and delivery of capacitor as per APSEB rules for LT connections
as per IS: 2834 with dropper resistance, data connection- 2 KVAR suitable
above 3 HP to 6HP and 3 KVAR above 6 HP to 9 HP)

Rates as per RC Agreement No. TO/08/2011-12, Dt.03.08.2010

up to 7.50 HP with DOL starter and suitable range of 1 No 6110.00 1 Each 6110.00
capacitor and swith fuse unit including all accessories

above 7.50 and up to 10.00 HP with fully atomatic star 1 No 6800.00 1 Each 6800.00
delta starter and suitable range of capacitor and swith
fuse unit including all accessories

above 10.00 HP with fully atomatic star delta starter and 1 No 10000.00 1 Each 10000.00
suitable range of capacitor and swith fuse unit including
all accessories

5 Supply abd delivery of PVC insulated and PV sheated flexible 3 core flat
type submersible cables suitable for submersible pumpsets conductors
composed of ennealed high conductivity copper wire, conforming to IS 694
with its revisions and ammendments from time to time and delivery at site
of installation of pumpset including central excise duty freight and transit
insurances etc., complete (in small quantities) but exclussive APGST

a 3 Core 1.5 Sqmm Flat cable 1 Rmt 53.00 1 Rmt 53.00


b 3 Core 2.5 Sqmm Flat cable 1 Rmt 66.00 1 Rmt 66.00
c 3 Core 4.00Sqmm Flat cable 1 Rmt 88.00 1 Rmt 88.00
d 3 Core 6.00Sqmm Flat cable 1 Rmt 135.00 1 Rmt 135.00
22 Supplying & fixing GI pipe Medium Grade as per IS 1239 ISI mark in
ground or on wall including cost of tees, elbows, bends, reducers,
couplings, running joints, union flanges, unions etc. with necessary
excavation in all types of soils except rock requiring blasting, refilling,
chasing masonry walls and making good the walls & floors to the originals,
surface and fixing MS clamps of TW block on walls, including cost and
conveyance of all materials and labour charges complete for finished item
of work.

a 50 mm dia nominal bore 1 Rmt 300.00 1 Rmt 300.00


b 65 mm dia nominal bore 1 Rmt 365.00 1 Rmt 365.00
c 80 mm dia nominal bore 1 Rmt 440.00 1 Rmt 440.00

6 Manufacture, supply, & delivery of 16Kg/Sqcm HDPE pipes conforming to


IS 4984 - 1995 including transportation to any where in A.P, excise duty,
sale tax etc., complete.

Rate worked out as per 2009-10 SSR


40mm dia 1 Rmt #REF! 1 Rmt #REF!
50mm dia 1 Rmt #REF! 1 Rmt #REF!
63 mm dia 1 Rmt #REF! 1 Rmt #REF!
7 Supply and delivery of GaIvanised Mild Steel bends heavy duty C class
threaded at both ends with arm length of 20 Cms. (Centre to Face)
including cost and conveyance, transit insurance all labour charges and
taxes and duties etc., complete.

40mm dia(32mm dia Rate adopted) 1 No 70.00 1 each 70.00


50mm dia 1 No 100.00 1 each 100.00
65mm dia 1 No 135.00 1 each 135.00
8 Supply and delivery of MS Clamp set 45mm length,12mm thick plate,
75mm wide with 6Nos of 16mm dia Bolts & Nuts at site of work for pump
installation including cost and conveyance of all materials, all taxes and
duties and transit insurance etc, complete.

40mm dia(32mm dia Rate adopted) 1 No 275.00 1 each 275.00


50mm dia 1 No 390.00 1 each 390.00
9 Supply , delivery and fixing of 12" long S/S Nippals, including all labour
charges and taxes and duties etc, complete
40mm dia(32mm dia Rate adopted) 1 No 75.00 1 each 75.00
50mm dia 1 No 70.00 1 each 70.00
65mm dia 1 No 150.00 1 each 150.00
10 Supply and delivery of Gate Valves leaded in tin bronze screwed internal
bends, screwed on bonnet internal seat design to IS 778/ 84 with its
ammendments class - 2 of sizes ISI Marked including cost and
conveyance, transit insurance all labour charges and taxes and duties etc.,
complete.

40mm dia 1 No 400.00 1 each 400.00


50mm dia 1 No 1250.00 1 each 1250.00
11 Manufacture, Supply and fixing of Galvanised Mild steel couplings of the
fallowing sizes
40mm dia 1 No 40.00 1 each 40.00
50mm dia 1 No 72.00 1 each 72.00
12 Supply & Delivery of CI Non-return Valve with ISI Mark. including cost and
conveyance, transit insurance all labour charges and taxes and duties etc.,
complete.

40mm dia 1 No 350.00 1 each 350.00


50mm dia 1 No 650.00 1 each 650.00
13 Supply & fixing of 50mm Dia MS Galvanised Bore Cover including cost
and conveyance, transit insurance all labour charges and taxes and duties
etc., complete
150mm dia 1 No 150.00 1 each 150.00
14 Supply and Delivery of MS Angular Stand for fixing of control Panel Board
- MS Angular stand consisting of L Angles of size 40mm x 40mm x 5mm
with 2 nos. 6'long verticals and 3 nos. - 2 1/2' long horizontals. The two
legs of the stand firmly fixed in Cement Concrete bed in CC (1:2:4) prop. of
size 1m x 0.3m x 0.2m depth below Ground Level. including cost and
conveyance, transit insurance all labour charges and taxes and duties etc.,
complete

1 No 800.00 1 each 800.00


15 Providing independent Earthing for the Pumpset/ motor using 40mm dia B
class GI Pipe of 2m length duly providing 12mm dia 16nos holes and
required bolts, nuts and washers, check nuts humbe pipe ring etc., as per
IS specifications with necessary double GI wire no.8 SWG including filling
with equal proportion of salt and Charcoal in layers and all labour charges
etc., complete.

1 No 1300.00 1 each 1300.00


16 Supply and Delivery of 7/20 Service Wire of repute make as per IS Code
including cost and conveyance, transit insurance all labour charges and
taxes and duties etc., complete.
1 Rmt 13.00 1 Rmt 13.00
17 Manufacture, supply, delivery of HDPE pipes conforming to IS 4984 - 1995
including transportation to any where in AP , including Excise duty, sales
tax etc., complete ( Supply upto 90mm dia in coil & above 90mm dia
strightin length in 6M) (PE - 80 grade - 6 Kg/Sq Cm)

Rate worked out as per 2009-10 SSR 1 Rmt 104.30 1 Rmt 104.30
18 Lowering, laying, jointing & testing of HDPE Pipe line laid to true alignment
and gradiant to hydraulic field test pressure per IS code including cost of
water with minimum water lead of 500m (Labour charges only) Outer dia
of pipes in mm.

1 Rmt 35.15 1 Rmt 35.15


add contractors profit @ 14% 4.92
Total Rs 40.07
19 Geologist investigation charges for bore well drilling etc,. Complete.

Rate as per GHMC Bore well rates 1 Job 700.00 1 Job 700.00

20 Supply and delivery of suitable flexible pipe to encase the submersible


cable
1 Rmt 8.00 1 Rmt 8.00

21 Installation, Testing, Trail Run and Commissioning of Submersible Pumps


set with all accessories as per the standard specifications.

1 Job 1500.00 1 Job 1500.00

23 RBR-FNDN-1: Earthwork in excavation in all types of soils for pipeline


trenches as per specification drawings and as directed by the
departmental officer and protecting the walls and other structures etc.,so
as not to disturb the existing utility services i.e water spply and sewer pipe
lines ,telephone, and power supply cables/ducts,strom water drains, traffic
signals etc., during laying of Pipe lines taking all precautionary measures
in the restricted areas for laying sewer/watermains including divertion of
traffic and backfilling in trenches with excavated suitable material and and
disposal of remaining earth upto a lead of 50 m, including all incidental
and operational charges etc., complete for Pipe Lines,

Rate as per Sewers data 1 Rmt 41.95 1 Rmt 41.95

24 Manufacture, supply, delivery of HDPE pipes conforming to IS 4984 - 1995


including transportation to any where in AP , including Excise duty, sales
tax etc., complete ( Supply upto 90mm dia in coil & above 90mm dia
strightin length in 6M) (PE - 100 grade - 6 Kg/Sq Cm)

Rate as per 2009-10 SSr as per data sheet 1 Rmt 104.30 1 Rmt 104.30

25 Lowering, laying, jointing & testing of HDPE Pipe line laid to true alignment
and gradiant to hydraulic field test pressure per IS code including cost of
water with minimum water lead of 500m (Labour charges only) Outer dia
of pipes in mm.

Rate as per 2009-10 SSR as per Lowering sheet 1 Rmt 35.15 1 Rmt 35.15
PRICE SCHEDULE
AGREEMENT NO:TO/08/2011-12, DATED : 03.08.2010
Name of the work:- Drilling of 163mm (6 1/2") dia Bore wells in Ranga Reddy District
Name of the Bore well Firm: M/s. Shiva Drillers, Saidabad, Hyderabad

Sl.No Description of item Unit Rates Approved


Rate in Figure Rate in words ( in Rs.)
1 2 3 5 6
Drilling of Bore wells by down the hole hammer, (DTH) drilling to
finished dia of 163mm (6 1/2" dia) in all formations to the depth
specified and reaming the bore to the required dia flushing the bore
walls at an average pressure of 7kg/Cm2 (100 PSI) conducting
yield test, inclusive of transportation form point to point, crew Up to depth of 90 Mtrs.
1.00 Rmt.
charges, consumables, shifting of Rig and all other charges etc., in @ Rs.305.00 and
(One
1 all over the District. The borewells should be true & vertical and above 90 Mtrs. Depth Three hundred and five only
Running
work should be caried out to the satisfaction of the department and meter only) 10% extra per Rmt on
carried out as per IS-2800 Part-1 7 II/ 1979 and amendments if drilling rate.
andy from time to time . The rate is inculding all taxes etc.,
complete as applicable.

Cost of 180mm dia/6kgf. UPVC casing pipes for bore wells for
potable water supply confiming to ISI.12818/1992 as amended from 1.00 Rmt.
to time including transporation etc., QC inspection should be carried (One
2 out by the concerned Deputy Executive engineer and Section As per Current SSR with condition of Price variation
Running
Officer, QC Certificate should be produced for making payment meter only)
inculding insertion of casing.
Drilling of Bore wells by down the hole hammer, (DTH) drilling using
combination of 8" to 11" dia Drill Bits in all formations to the using
depth60 m in collasable Soils and reaming the bore to the required
dia flushing the bore walls at an average pressure of 7kg/Cm2 (100
PSI) conducting yield test, inclusive of transportation form point to
point, crew charges, consumables, shifting of Rig and all other 1.00 Rmt.
charges etc., in all over the District. The borewells should be true & (One
3 Rs.535.00 Five hundred and thirty five only
vertical and work should be caried out to the satisfaction of the Running
department and carried out as per IS-2800 Part-1 7 II/ 1979 and meter only)
amendments if andy from time to time . The rate is inculding all
taxes etc., complete as applicable.

Slotted casing Pipe for Combination Rig PVC casing pipes for bore
wells for potable water supply confirming to ISI 12818/1992 as
amended from time to time including transportaion etc., QC 1.00 Rmt.
inspection should be carried out by the concerned Deputy (One As per Current SSR with condition of Price and 10% extra
4
Executive Engineer and section Officer, QC Ceritificate should be Running for slotting
produced for making payment including inseration of casing meter only)

Deepening of Bore well to a finish dia 163mm ( 6 1/2' dia) in all


formations to the depth specified and flusing the bore well at an
avergage pressure of 7 kg/cm2 (100 PSI), conducting yield test,
shifting of rig and all other charges etc., in all over the District, for 1.00 Rmt.
all depth and also inclusive of removal and Re-errection of Hand (One
5 Pump set. Bore well should be true and vertical and should be Rs. 315.00 Three hundred and fifteen only
Running
carried out to the satisfaction of the department. The rate is meter only)
including all taxes etc. complete as applicable.
Cleaning of Bore Wells by Flushing the Bore Wells size 6 1/2' & 4
1/2' dia at anverage pressure of 7kg/cm2 (100 PSl) conducting yield
test, inclusive of transporation from point to point, crew charges,
consumables, shifting of Rig and all other charges etc., in all over Each Bore Seven thousand and eight
6 Rs. 7800.00
the District carried out as per IS-2800 Part-1 & ll/ 1979 and well hundred only
amendments if any from time to time. The rate is including all taxes
etc. complete as applicable.

.
KODADA MUNICIPALITY

Improvement of Ambedkar Junction in Boduppal Municipality

GENERAL ABSTRACT

S.No Description of Items Quantity

1 Widening of existing Road duly duly dismantling the obstructions 1 job

2 Construction of Footpaths and shifting the Ambedkar statue 1 job

3 Development of Greenary. 1 job

4 Providing Street Lighting in dismantled area 1 job

5 Providing Central lighting Lighting along the mediun 1 job

6 Providing Highmast lamp in Ambedkar Chowrastha. 1 job

Sub-Total. A Rs.

7 Add VAT @ 5%

8 Add Labour Cess @ 1%

9 Provision towards QC @ 1%

10 Provision towards seiniorage charges


Provision towards Consultancy charges for Preparation of DPRs @
11
1.5%
12 L.S for Unforseen items

Sub-Total. B Rs.

Total Project Cost ( A+B ) Rs.

Say Rs.
nicipality

Amount in Rs.

#REF!

2072032.02

340771.59

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
Page 1036 of 2191

KODADA MUNICIPALITY
Improvement of Ambedkar Junction in Boduppal Municipality
DETAILED & ABSTRACT ESTIMATION
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
A Road Work
1 RBR-STCL-3 : Cutting of trees, including cutting of trunks, branches and
removal of stumps & roots, refilling, compaction of backfilling and stacking of
serviceable material by manual means with all lifts as per Technical
Specification Clause 201MORD / MORTH
for widening of the existing road 1 x 8 8 Nos #REF! 1 Nos
2 RBR-STCL-5 : Dismantling of existing structures like culverts, bridges,
retaining walls and other structure comprising of masonry, cement concrete,
wood work, steel work, including T&P and scaffolding wherever necessary,
sorting the dismantled material, disposal of unserviceable material and
stacking the serviceable material with all lifts and lead of 1000 m as per
Technical Specification Clause 202 MORD / MORTH- By Manual Means

a Cement Concrete M15 & M20 1 x 5 5.00 2.00 0.150 7.50 Cum #REF! 1 Cum
b Reinforced Cement Concrete and prestressed Concrete 1 x 5 4.00 1.00 0.200 4.00 Cum #REF! 1 Cum
3 RBR-STCL-7 ;Dismantling of existing structures like culverts, bridges, retaining
walls and other structure comprising of stone masonry, including disposal of
unserviceable material and stacking the serviceable material with all lifts and
lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH ,
Rubble Stone Masonry in Cement Mortar

existing pedastal of Ambedkar statue ( below and above GL ) pi*r 2*h 1 x 1 3.14 1.85 2.75 15.97
existing pedastal 1st step ( below and above GL ) 1 x 1 2.45 2.45 2.75 16.51
existing pedastal 2nd step ( below and above GL ) 1 x 1 1.90 1.90 1.20 4.33
Compound wall of existing G+4 building at the corners 1 x 1 22.20 0.45 0.60 5.99
foundations of existing structures 1 x 1 11.40 0.45 0.60 3.08
other structures 1 x 4 6.00 0.60 0.60 8.64
54.52 Cum #REF! 1 Cum
4 Dismantling of existing structures like culverts, bridges, retaining walls and
other structures comprising of brick masonry, including disposal of
unserviceable material and stacking the serviceable material with all lifts and
lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH
Compound wall of existing G+4 building at the corners 1 x 1 15.20 0.23 1.80 6.29

447524687.xlsx-Improvement of Junction 1036


Page 1037 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
Compound wall of existing G+4 building at the corners 1 x 1 22.20 0.23 1.80 9.19
foundations of existing structures 1 x 1 11.40 0.23 3.05 8.00
other structures 1 x 4 6.00 0.23 3.05 16.84
40.32 Cum #REF! 1 Cum

447524687.xlsx-Improvement of Junction 1037


Page 1038 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
5 RBR-STCL-8 : Dismantling of flexible pavements and disposal of dismantled
materials upto a lead of 1000 m, stacking serviceable and unserviceable
materials separately as per Technical Specification Clause 202 MORD /
MORTH
a Bituminous Courses - By machanical means.
Ch.0m to turning in the right side for widening of the existing road 1 x 1 47.00 2.50 0.100 11.75
for providing mediun and road from chainage 0.00m to 35.00m 1 x 1 35.00 2.05 0.100 7.18
for Mediun -2, from ch.0.00m to 22.00m 1 x 1 22.00 1.25 0.100 2.75
for Mediun -2, from ch.22.00m to 75.00m 1 x 1 53.00 1.25 0.100 6.63
28.31 Cum #REF! 1 Cum
b Granular Courses - by manual means
Ch.0m to turning in the right side for widening of the existing road 1 x 1 47.00 2.50 0.400 47.00
for providing mediun and road from chainage 0.00m to 35.00m 1 x 1 35.00 2.05 0.400 28.70
for Mediun -2, from ch.0.00m to 22.00m 1 x 1 22.00 1.25 0.400 11.00
for Mediun -2, from ch.22.00m to 75.00m 1 x 1 53.00 1.25 0.400 26.50
113.20 Cum #REF! 1 Cum
6 RBR-EECD-5 : Earthwork excavation for road way in soil by mechanical
means including cutting and pushing the earth to side of embankment upto a
lead of 100 metres including trimming bottom and side slopes in accordance
with requirements of lines, grades and cross sections etc., complete for
finished item of work for trench cutting as per MOR&H specification No.301
and as directed by the Engineer-in-Charge
for widening of road - Area- 1 1 x 1 42.50 7.20 0.45 137.70
for widening of road - Area- 2 1 x 1 29.00 4.20 0.45 54.81
for widening of road - Area- 3 1 x 1 29.00 1.20 0.45 15.66
for widening of road - Area- 4 1 x 1 67.50 3.50 0.45 106.31
for widening of road - Area- 5 1 x 1 50.00 1.95 0.45 43.88
for widening of road - Area- 6 1 x 1 12.50 2.20 0.45 12.38
for widening of road - Area- 7 1 x 1 11.00 1.70 0.45 8.42
379.16 Cum #REF! 1 Cum
7 RBR-SBBS-12 : Granular sub-base/base/surface course with local materials
(Table 400.13) by mix in place method normal Construction of granular sub-
base by providing local material spreading in uniform layers with motor grader
on prepared surface, mixing by mix in place method with rotavator at once and
compacting with smooth wheel roller to achieve the desired density complete
as per Clause 401.4 as per Technical Specification Clause 408 MORD.

for widening of road - Area- 1 1 x 1 42.50 7.10 0.225 67.89


for widening of road - Area- 2 1 x 1 29.00 4.10 0.225 26.75
for widening of road - Area- 3 1 x 1 29.00 1.10 0.225 7.18

447524687.xlsx-Improvement of Junction 1038


Page 1039 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
for widening of road - Area- 4 1 x 1 67.50 3.40 0.225 51.64
for widening of road - Area- 5 1 x 1 50.00 1.85 0.225 20.81
for widening of road - Area- 6 1 x 1 12.50 2.10 0.225 5.91
for widening of road - Area- 7 1 x 1 11.00 1.60 0.225 3.96
184.14 Cum #REF! 1 Cum
8 RBR-SBBS-11 : Providing, laying, spreading and compacting graded stone
aggregate to wet mix macadam specification including premixing the material
with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material
by tipper to site, laying in uniform layers in sub-base/base course on a well
prepared sub-base and compacting with smooth wheel roller of 80 to 100kN /
Vibratory Roller 80-100 kN weight to achieve the desired density including
lighting, barricading and maintenance of diversion, etc as per Tables 400.11 &
400.12 and Technical Specification Clause 406 MORD / MORTH.

for widening of road - Area- 1 1 x 1 42.50 7.00 0.225 66.94


for widening of road - Area- 2 1 x 1 29.00 4.00 0.225 26.10
for widening of road - Area- 3 1 x 1 29.00 1.00 0.225 6.53
for widening of road - Area- 4 1 x 1 67.50 3.30 0.225 50.12
for widening of road - Area- 5 1 x 1 50.00 1.75 0.225 19.69
for widening of road - Area- 6 1 x 1 12.50 2.00 0.225 5.63
for widening of road - Area- 7 1 x 1 11.00 1.50 0.225 3.71
178.72 Cum #REF! 1 Cum
9 RBR-BASC-1: Providing and applying primer coat with bitumen emulsion (SS-
1) on prepared surface of granular base including cleaning of road surface and
spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per
Technical Specification Clause 502 MORD (for use on Wet mix macadam &
WBM)
for widening of road - Area- 1 1 x 1 42.50 7.00 297.50
for widening of road - Area- 2 1 x 1 29.00 4.00 116.00
for widening of road - Area- 3 1 x 1 29.00 1.00 29.00
for widening of road - Area- 4 1 x 1 67.50 3.30 222.75
for widening of road - Area- 5 1 x 1 50.00 1.75 87.50
for widening of road - Area- 6 1 x 1 12.50 2.00 25.00
for widening of road - Area- 7 1 x 1 11.00 1.50 16.50
794.25 Sqm #REF! 1 Sqm

447524687.xlsx-Improvement of Junction 1039


Page 1040 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
10 RBR-BASC-7: Providing and laying dense graded bituminous macadam with
100-120 TPH batch type HMP producing an average output of 75 tonnes per
hour using crushed aggregates of specified grading, premixed with bituminous
binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the
hot mix to work site, laying with a hydrostatic paver finisher with sensor control
to the required grade, level and alignment, rolling with smooth wheeled,
vibratory and tandem rollers to achieve the desired compaction as per MoRTH
specification clause No. 507 complete in all respects.

area - A as per drawing 1 x 1 1966.50


area - B as per drawing 1 x 1 101.50
area - C as per drawing 1 x 1 99.00
area - D as per drawing 1 x 1 259.25
deduct mediun -1 area -44.50
deduct mediun -2 area -114.00
Total Qty 2267.75 0.05 113.39 Cum #REF! 1 Cum
11 RBR-BASC-2- v : Providing and applying tack coat with bitumen emulsion
using emulsion pressure distributor at the rate of 0.20 kg per sqm on the
prepared bituminous/granular surface cleaned with mechanical broom as per
Tech. specification No 503 MORTH
2267.75 2267.75 Sqm #REF! 1 Sqm
12 RBR-BASC-8: Providing and laying semi dense bituminous concrete with 40-
60 TPH batch type HMP producing an average output of 37.5 tonnes per hour
using crushed aggregates of specified grading, premixed with bituminous
binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work
site, laying with a hydrostatic paver finisher with sensor control to the required
grade, level and alignment, rolling with smooth wheeled, vibratory and tandem
rollers to achieve the desired compaction as per MoRTH specification clause
No. 508 complete in all respects

2267.75 0.025 56.69 Cum #REF! 1 Cum

B Foot paths
13 BLD-CSTN-2-1 (9): Earth work excavation and depositing on bank for all lifts
and with an initial lead of 10m including all operational, incidental, labour
charges such as shoring ,sheeting, planking, strutting, etc. complete for
finished item of work including seigniorage excluding dewatering charges etc
as per SS - 20 B (APSS 308). Data- Bld -
3

447524687.xlsx-Improvement of Junction 1040


Page 1041 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
a For foot paths
Length and areas as per drawing
for sectioning & levelling of the ground - Area - A 1 x 1 110.00 3.00 0.15 49.50
for sectioning & levelling of the ground - Area - B 1 x 1 383.60 3.00 0.15 172.62
for sectioning & levelling of the ground - Area - C 1 x 1 154.80 3.00 0.15 69.66
for sectioning & levelling of the ground - Area - D 1 x 1 71.60 2.00 0.15 21.48
for sectioning & levelling of the ground - Area - E 1 x 1 30.60 2.00 0.15 9.18
for mediun area - 1 1 x 1 35.00 1.25 0.15 6.56
for mediun area - 2 1 x 1 22.00 2.20 0.15 7.26
1 x 1 53.00 1.25 0.15 9.94
for the foundation of Ambedkar statue ( pi x r 2 x h ) ( 1.7m dia) 1 x 1 3.14 0.72 1.35 3.05
around the pedastal for ramp ( 2 x pi x r x t x h ) 1 x 6.28 2.00 1.00 0.20 2.51
for foundation of Kerb in area - A 1 x 2 40.00 0.215 0.30 5.16
for foundation of Kerb in area - B 1 x 2 119.60 0.215 0.30 15.43
for foundation of Kerb in area - C 1 x 2 56.40 0.215 0.30 7.28
for foundation of Kerb in area - D 1 x 2 38.00 0.215 0.30 4.90
for foundation of Kerb in area - E 1 x 2 17.30 0.215 0.30 2.23
for mediun area - 1 1 x 2 40.00 0.215 0.30 5.16
for mediun area - 2 1 x 2 80.00 0.215 0.30 10.32
Total Qty 402.24 Cum 210.92 1 Cum
14 BLD-CSTN-2-8 (16) : Filling with Stone dust in trenches, sides of foundations
and basement with initial lead in layers not exceeding 15 cm thick,
consolidating each deposited layer by watering and ramming including cost
and conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work. (APSS
NO. 309 & 310)

filling in the foundation in Area - A 1 x 1 110.00 3.00 0.10 33.00


filling in the foundation in Area - B 1 x 1 383.60 3.00 0.10 115.08
filling in the foundation in Area - C 1 x 1 154.80 3.00 0.10 46.44
filling in the foundation in Area - D 1 x 1 71.60 2.00 0.10 14.32
filling in the foundation in Area - E 1 x 1 30.60 2.00 0.10 6.12
for mediun area - 1 1 x 1 35.00 1.25 0.10 4.38
for mediun area - 2 1 x 1 22.00 2.20 0.10 4.84
1 x 1 53.00 1.25 0.10 6.63
for the foundation of Ambedkar statue ( pi x r 2 x h ) - ( 1.70m dia) 1 x 1 3.14 0.72 0.15 0.34
around the pedastal for ramp ( 2 x pi x r x t x h ) 1 x 6.28 2.00 1.00 0.10 1.26
for foundation of Kerb in area - A 1 x 2 40.00 0.215 0.10 1.72

447524687.xlsx-Improvement of Junction 1041


Page 1042 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
for foundation of Kerb in area - B 1 x 2 119.60 0.215 0.10 5.14
for foundation of Kerb in area - C 1 x 2 56.40 0.215 0.10 2.43
for foundation of Kerb in area - D 1 x 2 38.00 0.215 0.10 1.63
for foundation of Kerb in area - E 1 x 2 17.30 0.215 0.10 0.74
for mediun area - 1 1 x 2 40.00 0.215 0.10 1.72
for mediun area - 2 1 x 2 80.00 0.215 0.10 3.44
Total Qty 249.23 Cum 910.40 1 Cum
15 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain
Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse
aggregate ) using 40mm size Hard Granite Machine Crushed Metal including
cost and conveyance of all materials like cement, sand, coarse aggregate
water etc., to site , seigniorage charges on all materials, labour charges , for
mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the
required level curing etc., complete for finished item of work.for foundation and
under flooring bed.

below the tiles in Area - A 1 x 1 110.00 3.00 0.075 24.75


below the tiles in Area - B 1 x 1 383.60 3.00 0.075 86.31
below the tiles in Area - C 1 x 1 154.80 3.00 0.075 34.83
below the tiles in Area - D 1 x 1 71.60 2.00 0.075 10.74
below the tiles in Area - E 1 x 1 30.60 2.00 0.075 4.59
for mediun area - 1 1 x 1 35.00 1.25 0.075 3.28
for mediun area - 2 1 x 1 22.00 2.20 0.075 3.63
1 x 1 53.00 1.25 0.075 4.97
for the foundation of Ambedkar statue ( pi x r 2 x h ) 1 x 1 3.14 0.72 0.15 0.34
around the pedastal for ramp ( 2 x pi x r x t x h ) 1 x 6.28 2.00 1.00 0.10 1.26
Total Qty 174.70 Cum 3785.55 1 Cum
16 RBR-TSRA-29 : Cast in Situ Cement Concrete M20 Kerb: Construction of
cement concrete kerb with top and bottom width 115 and 165 mm respectively,
250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick,
foundation having 50 mm projection beyond kerb stone, kerb stone laid with
kerb laying machine, foundation concrete laid manually, all complete as per
clause 408 MORTH

for Kerbing of Pathways


for foundation of Kerb in area - A 1 x 2 40.00 80.00
for foundation of Kerb in area - B 1 x 2 119.60 239.20
for foundation of Kerb in area - C 1 x 2 56.40 112.80

447524687.xlsx-Improvement of Junction 1042


Page 1043 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
for foundation of Kerb in area - D 1 x 2 38.00 76.00
for foundation of Kerb in area - E 1 x 2 17.30 34.60
for mediun area - 1 1 x 2 40.00 80.00
for mediun area - 2 1 x 2 80.00 160.00
782.60 Rmt 286.24 1 Rmt
17 BLD-CSTN-9-4-(102) : Flooring with precast terrazzo chequered tiles
conforming to IS: 13801 Supplying precast terrazzo chequered tiles
conforming to IS:13801 using marble aggregates of size 10mm, sand, marble
powder, white cement pigments etc., with terrazzo topping not less than 6 mm
of tiles overall size not less than 20 mm thick any coloured shades. set over
base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or
RCC roof slab, including near cement slurry of honey like consistency spread
@ 3.3.kgs per sqm & jointed with neat cement to full depth mixed with pigment
of matching shade including cost of all materials like cement, sand water and
tiles etc., complete, including seigniorage charges, complete for finished item
of work, including the cost and conveyance of all materials.

filling in the foundation in Area - A 1 x 1 110.00 110.00


filling in the foundation in Area - B 1 x 1 383.60 383.60
filling in the foundation in Area - C 1 x 1 154.80 154.80
filling in the foundation in Area - D 1 x 1 71.60 71.60
filling in the foundation in Area - E 1 x 1 30.60 30.60
for mediun area - 1 1 x 1 43.75 43.75
for mediun area - 2 1 x 1 114.65 114.65
909.00 Sqm 783.45 1 Sqm
18 BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 )
Prop using hard granite stone including cost & Conveyance of all materials like
Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all
Materials, ,labour charges for cutting Stones to required size and shape,
mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc.,
complete for finished item of Work .

for pedastal of Ambedkar statue below GL 1 x 1 3.14 0.62 1.05 2.04 Cum 3470.13 1 Cum

447524687.xlsx-Improvement of Junction 1043


Page 1044 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
19 BLD-CSTN-6-6-(61) : Construction of CRS Masonary 2nd Sort in Cement
Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all
materials like Cement, Sand , Water, Granite Stones, including Seigniorage
Charges on all Materials, ,labour charges for cutting Stones to required size
and shape, mixing of Cement Mortor, Construction, Scaffolding Charges
curing etc., complete for finished item of Work .

for Pedastal of Ambedkar statue above GL 1 x 1 3.14 0.64 2.00 4.02 Cum
around the pedastal for ramp ( 2 x pi x r x t x h ) 1 x 6.28 2.00 1.00 0.30 3.77 Cum
7.79 Cum 4074.46 1 Cum
20 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain
Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top
surface to the required level curing etc., complete for finished item of work with
nomonal reinforcement

over pedastal for the foundation of the statue 1 x 1 3.14 0.64 0.20 0.40
around the pedastal for ramp ( 2 x pi x r x t x h ) 1 x 6.28 2.00 1.00 0.10 1.26
1.66 Cum 5044.84 1 Cum
21 Cladding to External walls with Granite stone tiles 8 mm thick (mirror polished
of all shades) using cement compatible bonding agent having acrylic emulsion
base set over 12mm thick CM (1:3) base coat and neat grey cement slurry of
honey like consistency spread at the rate of 3.3 kg.s per sq.mt including fixing
with MS clits with anticorrosive coating hold fasts and using Janatha paste and
jointed with white cement paste mixed with pigment of matching shade to
match the shade of granite slabs including cost and conveyance of all
materials and water to work site, including cost of seigniorage charges on all
materials and all operational, incidental, and labour charges such as mixing
mortar, fixing in position, including lift charges, curing, including cutting the
brick masonry walls and redoing the same such that the top surface of tiles is
to be flushed with plastered surface etc., complete for finished item of work.
(APSS No.701 & 707)

around the pedastal of Ambedkar statue ( 2pi x r x h ) 1 x 6.28 0.80 2.000 10.05
around the platform ( 2pi x r x h ) 1 x 6.28 1.80 0.300 3.39
13.44 Sqm 1458.57 1 Sqm

447524687.xlsx-Improvement of Junction 1044


Page 1045 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
22 BLD-CSTN-9-7-(105) :Flooring with High Polished Granite 16 to 18 mm thick
up to 8'-00 (2.43 M) other than black / premium colours slabs set over base
coat of cement mortar (1:8), 20 mm thick over CC bed already laid or RCC
roof slab, including neat cement slurry of honey like consistency spread @
3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment
of matching shade to full depth, including cost of all materials like cement,
sand water and tilesetc., complete, including seigniorage charges, labour
charges for dressing of tilesetc., complete for finished item of work,including
the cost and conveyance of all materials.

over pedastal 1 x 1 3.14 0.64 2.01


over Ramp etc 1 x 6.28 2.00 1.00 12.56
14.57 Sqm 4529.39 1 Sqm
Provision for shifting the Statue from old pedastal to new pedastal
Sub- Total for Path ways -B
C Greenary
* Qty of Red Earth and Manure required.
Green area- 1 - area 1 x 1 117.00 0.350 40.95
Green area- 2 - area 1 x 1 40.00 0.350 14.00
Mediun -1 - area 1 x 1 44.50 0.350 15.58
Mediun -2 - area 1 x 1 114.00 0.350 39.90
110.43 Cum

23 Imporatation of good quality red earth congenial for plants grouth of light
textured, crystalline, porous and friable, generally acidic or neutral but not
alkaline, fertile, cost, transportation, loading, unloading etc complete
75% of the Total Qty 110.43 75% 83.00 Cum 1231.59 1 Cum
24 Supply at site of work well decayed farm yard manure, from any available
source, approved by the engineer in charge including screening and stacking
25% of the Total Qty 110.43 25% 28.00 Cum 1344.07 1 Cum
25 RBR-HRTC-1: Spreading of sludge farm yard manure or/ and good earth in
required thickness (cost of sludge, farm yard manure or/and good earth to be
paid for separately) as per Specification 307 MORTH
in side Greenary area and Mediuns 110.43 Cum 40.20 1 Cum

447524687.xlsx-Improvement of Junction 1045


Page 1046 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
26 Based on Item No.2 of HMDA (FSR), Pg.31 -CARPET GRASS-KOREAN /
MEXICAN : Making lawns by Dressing the surface to the desired shape, laying
6" layer of fine red soil, covered with a thin layer of sand, watering, rolling with
hand roller (4" thckness after rolling), including the cost of red earth, sand and
labour charges and the cost of fertlizers, chemical and grass etc,. complete as
per standard practice.

Area as per Drawing 283.95 Sqm 585.12 1 Sqm

447524687.xlsx-Improvement of Junction 1046


Page 1047 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
27 Planting Speciman plants including digging of pits 60cm. Cubes, loosening of
15cm. Bottom red soil, filling with soil with 10 kg Compost + 100 DAP per pit
staking gap filling with in two month after planting.
Golden bamboo 8” 1 x 5 5 Nos 1483.91 1 No
Fercaria 2” 1 x 5 5 Nos 2069.03 1 No
Ficus 4” (Verites). 1 x 5 5 Nos 1199.88 1 No
Bottle Bush 1 x 5 5 Nos 1313.49 1 No
Sub- Total for Greenary - C

Say Rs.

447524687.xlsx-Improvement of Junction 1047


Page 1048 of 2191

DA MUNICIPALITY
ar Junction in Boduppal Municipality
ABSTRACT ESTIMATION

Amount

#REF!

#REF!
#REF!

#REF!

447524687.xlsx-Improvement of Junction 1048


Page 1049 of 2191

Amount

#REF!

447524687.xlsx-Improvement of Junction 1049


Page 1050 of 2191

Amount

#REF!

#REF!

#REF!

447524687.xlsx-Improvement of Junction 1050


Page 1051 of 2191

Amount

#REF!

#REF!

#REF!

447524687.xlsx-Improvement of Junction 1051


Page 1052 of 2191

Amount

#REF!

#REF!

#REF!
#REF!

447524687.xlsx-Improvement of Junction 1052


Page 1053 of 2191

Amount

84840.46

447524687.xlsx-Improvement of Junction 1053


Page 1054 of 2191

Amount

226898.99

661335.59

447524687.xlsx-Improvement of Junction 1054


Page 1055 of 2191

Amount

224011.00

712156.05

7079.07

447524687.xlsx-Improvement of Junction 1055


Page 1056 of 2191

Amount

31740.04

8374.43

19603.18

447524687.xlsx-Improvement of Junction 1056


Page 1057 of 2191

Amount

65993.21
30000.00
2072032.02

102221.97

37633.96

4439.29

447524687.xlsx-Improvement of Junction 1057


Page 1058 of 2191

Amount

166144.82

447524687.xlsx-Improvement of Junction 1058


Page 1059 of 2191

Amount

7419.55
10345.15
5999.40
6567.45
340771.59
#REF!
#REF!

447524687.xlsx-Improvement of Junction 1059


Page 1060 of 2191

#REF!
#REF!
Estimate for providing of Central lighting in side the Median
S.No Description of Work Nos L Qty Rate Per

1 Earth work excavation of Trench in hard ground soil, laying of U.G cables upto 50 Sq,mm on sand cushion covering the cable with bricks and back filling of Trench duly providin

2 Material and labour for Cement Concrete (1:2:4) Type B2 using 20 mm graded stone aggregate
as in foundations and coping of poles complete all as specified and as directed by Project
Manager
1 x 40 40 Cum 7376.60 1 Cum
3 ELEC-7.2.3 : Fabrication, Transportation and supply of hot-dip galvanized Octogonal Pole with
BSEN -10025 grade S 355 JO steel plate for shaft, IS 2062 for base plate with door opening
arrangement, including the supply of suitable boards with bakelite sheet and MCB's as per IS
specification suitable to withstand the wind speed of 180 KMPH for 9mtrs height Pole having
dimensions Bottom 155mm, Top 70mm with 3mm thick, base plate 260 x260 x16mm and 4 Nos
of M24 x 750 long 'J' bolts along with template of Makes: Bajaj / Valmont / TRANSRAIL

MS pole 1 x 40 40 Nos 12422.66 1 Each


50 MM dia (OD) MS pipe double arm bracket suitable for fixing street light luminaire. 2 x 40 80 Nos 1477 1 Each
4 ELEC-4.1.11& ELEC-4.1.12: Supply and erecting PVC armored cable 1100 V. Grade with ISI
mark following standard / slid aluminum conductor complete by making trench in soil up to 0.9 M
deep embedding the cable complete with sand bed of 20 Cms thick layers and bricks placed on
top the cable width wise all over the rum and back filling the excavated earth without stones are
hard materials and making the surface proper with 15 Cms crown on the top duly providing route
indicators connections etc., complete (as per IS 1225) as directed by the department.

4 Core 10 Sqmm 40 x 36 1440.00 1440 Rmt 145.43 1 Rmt


4 Core 16 Sqmm 1 x 25 10.00 250 Rmt 159.06 1 Rmt

Cental Light (2) 447524687.xlsx


Page 1061 of 2191

S.No Description of Work Nos L Qty Rate Per

5 Fabrication supply and errection of water tight M.S junction Box 260 x 300 x 140 mm (depth) size
and 16 guage MS sheet with fixing arrangements, with necessary holes for cable entry and exit
from the box. The box shall be provided with cover and hinges on one side and bolting at other
end. The box shall be fixed by clamps fabricated from 25mm x 3mm MS flat. The box consisting of
2 Nos of MCB and 1 No of 60 AMPS ‘L’ way consider doubl arm and box shall be painted with one
coat of Red Oxide and two coats aluminium paint including transportation etc., complete for
finished item of work.

39 x 1 39 Nos 5751.83 1 Each

Cental Light (2) 447524687.xlsx


Page 1062 of 2191

S.No Description of Work Nos L Qty Rate Per

6 Providing independent earthing for sophisticated equipment like computer medical Equipment,
Electronic Gadgets etc., with 600mm x 600mm x3.15 mm thick copper plate rigidly fixed to the
40mm dia GI pipe of 2.5 Mtrs. Length and 19mm dia ‘B’ class GI pipe of 0.3 M long connected
with reducer providing GI funnel covers with wire mesh of suitable size staggered holes of 16 Nos
of 12mm dia to the earht electrode, enclosed in a CC chamber of 400mm x 400mm x 400mm
covered with reinforced cement concrete cover and all labour charges RCC slab cover duly filing
salt and charcoal in layers from the bottom of the earth pit, giving earth connections from the
electrodes to GI strip 25 x 6 x 200mm length provided with holes GI washers, boths and labour
charges etc., complete.

1 x 4 4 Nos 3856.5 1 Each


7 Supply and erection of Integral street light luminaire of 150W MH lamp fitting comprises of single
piece die cast Aluminium body with copper wound ballast and capacitor, Ignitor, with pot optics
including 150W MH lamp etc., complete.
40 x 2 80.00 80 Nos 5538.73 1 Each
8 Supply and erection of the feeder pillar box of MS sheet of 14 SWG 110 X 700 X 250 mm in size
and painted with 2 coats of red oxide and two coats of synthetic enamel paint of light gray shade
(or power coated). The FPB should be out door type, dust and vermin proof, confirming to IP – 55
degree of protection as per IS – 2147. The inner door of the box should be having an interlocking
arrangement. Single compression cable glands and crimping type lugs shall be carried out with
copper standard conductor, flexible PVC insulated 1100 V grade wire. The FPB should consists
the following.

LS

Cental Light (2) 447524687.xlsx


Page 1063 of 2191

S.No Description of Work Nos L Qty Rate Per

a) Out door with concealed hinges and neoprene sponge gasket.


b) Hinged inner door.
c) MS bracket for pad locking facility with Canopy.
d) 3 Nos siemen’s type door lock with key on outer door.
e) Danger notice plate.
f) MS base channel 50 x 50 x 3 mm thick and 2 Nos thumb screws.
g)1 No Micro processed based electronic timer.
h) 3 Nos 63 A HRC fuses EE or equivalent make. LS
k) 4 Nos 60 A TPN MCB’s as out going MDS / Havell’s
l) 4 Nos 25 x 6mm thick alluminium bus bars for R.Y.B phases and neutral mounted rigidly on
suitable insulators.
m)1 No 110 A Contactor (ML – 6) L&T make.
n) 1 No kaycee make auto / mannual switch.
o) Removable undrilled MS painted cable gland plate.
p) MS base plate for mounting switch gear components.
q) 4 Nos foundation holes in base channel to suit M 12 foundation bolts.
r) 4 Nos 4 way terminal blocks for outgoing cricuits open barrier type balson / Everest / Essen or
equivalent make (1 No. 100 A four way terminal block for incoming open barriers type or balson /
everest / essen or equivalent make.
s) 2 Nos earthing studs (M10) with nut and spring washer etc,.

1 x 3 3 Job 32000.00 1 Job

Cental Light (2) 447524687.xlsx


Page 1064 of 2191

S.No Description of Work Nos L Qty Rate Per

9 CC (1:2:4) prop. providing CC blocks of size 0.45 x 1.20 mts. base and 0.45 mt. As high tapered
to 0.35 to a hight 0.3 mts. from base and 0.23 mts. from 0.35 to top of the block for road divider
using 20mm HG machine crushed metal machine mixing and vibrating and laying in the steel
certering box including all cost and conveyance of all materials and labour charges and curing
etc., complete.
1 x 1 1 No 509.19 1 Each
10 ELEC-3.5.1: Supply & Installtion of Automatic Street Light Control System with Optical Sensor,
Low volatage / High voltage trip and reset, operating voltage 150 - 280V AC, 50 HZ with suitable
SMC enclousure of IP 54 protection, MCBs and contactor suitable to control the load of 3 KW of
single phase load with necessary clamping arrangements. Makes : Swadeep Nature Switch /
Light Mate.
LS provisions Each
Total Amount Rs.
SAY

Cental Light (2) 447524687.xlsx


Page 1065 of 2191

S.No Description of Work Nos L Qty Rate Per

1 Fabrication, Transportation and supply of hot-dip galvanized Octogonal Pole with BSEN - 10025 7.2.3
grade S 355 JO steel plate for shaft, IS 2062 for base plate with door opening arrangement,
including the supply of suitable boards with bakelite sheet and MCB's as per IS specification
suitable to withstand the wind speed of 180 KMPH for 9 Mtrs height Pole having dimensions
Bottom 155 mm,. Top 70mm with 3mm thick, base plate 220 x 220 x12mm and 4 Nos of M24 x
750 long 'J' bolts along with template of Makes : Surya / LAASMA

Cental Light (2) 447524687.xlsx


Page 1066 of 2191

#REF!
#REF!
of Central lighting in side the Median
Amount

295064.00

496906.56
118160.00

209415.17
39765.25

Cental Light (2) 447524687.xlsx


Page 1067 of 2191

Amount

224321.37

Cental Light (2) 447524687.xlsx


Page 1068 of 2191

Amount

15426.00

443098.40

Cental Light (2) 447524687.xlsx


Page 1069 of 2191

Amount

96000.00

Cental Light (2) 447524687.xlsx


Page 1070 of 2191

Amount

509.19

200000.00
2138665.94
21.39 Lakhs

Cental Light (2) 447524687.xlsx


2018-19

Ref. to SSR Description of Item Unit


ELECTRICAL ITEMS (Final)
Sl. No. ITEM CODE DESCRIPTION OF THE ITEM UNIT
1 SECTION M.S. CONDUIT PIPES
I SUB-SECTION
1.1 M.S. CONDUIT PIPES
1 ELEC-1.1.1 Supply of ISI, 20mm dia, 16 guage thickness MS conduit pipe 1 Mtr
of makes NAI / Bharath / GB.
2 ELEC-1.1.2 Supply of ISI, 25mm dia, 16 guage thickness MS conduit pipe 1 Mtr
of makes NAI / Bharath / GB.

3 ELEC-1.1.3 Supply of ISI, 32mm dia,16 guage thickness MS conduit pipe 1 Mtr
of makes NAI / Bharath / GB.

4 ELEC-1.1.4 Supply of ISI, 38mm dia, 16 guage thickness MS conduit pipe 1 Mtr
of makes NAI / Bharath / GB.

5 ELEC-1.1.5 Supply of ISI, 50mm dia,16 guage thickness MS conduit pipe 1 Mtr
of makes NAI / Bharath / GB.

6 ELEC-1.1.6 Supply of 19 / 20 mm MS Junction box normal range big size 1 No


long neck.

7 ELEC-1.1.7 Supply of 25 mm MS Junction box normal range big size long 1 No


neck.

8 ELEC-1.1.8 Supply of 32 mm MS Junction box normal range big size long 1 No


neck.

9 ELEC-1.1.9 Supply of 40 / 38 mm MS Junction box normal range big size 1 No


long neck.

10 ELEC-1.1.10 Supply of 50 mm MS Junction box normal range big size 1 No


long neck.

11 ELEC-1.1.11 Supply of 25/20mm.MS Junction deep box. 1 No

12 ELEC-1.1.12 Supply of 32mm.MS Junction deep box. 1 No

13 ELEC-1.1.13 Supply of 40mm.MS Junction deep box. 1 No

14 ELEC-1.1.14 Supply of 19/20mm MS Inspection Bends. 1 No

15 ELEC-1.1.15 Supply of 25mm MS Inspection Bends. 1 No

16 ELEC-1.1.16 Supply of 32mm MS Inspection Bends. 1 No

17 ELEC-1.1.17 Supply of 40/38mm MS Inspection Bends. 1 No

18 ELEC-1.1.18 Supply of 50mm MS Inspection Bends. 1 No

19 ELEC-1.1.19 Supply of 19/20mm MS Inspection Tee. 1 No

20 ELEC-1.1.20 Supply of 25mm MS Inspection Tee. 1 No


21 ELEC-1.1.21 Supply of 32mm MS Inspection Tee. 1 No

22 ELEC-1.1.22 Supply of 40/38mm MS Inspection Tee. 1 No

23 ELEC-1.1.23 Supply of 50mm MS Inspection Tee. 1 No

24 ELEC-1.1.24 Supply of 19/20mm MS Inspection Elbow. 1 No

25 ELEC-1.1.25 Supply of 25mm MS Inspection Elbow. 1 No

26 ELEC-1.1.26 Supply of 32mm MS Inspection Elbow. 1 No

27 ELEC-1.1.27 Supply of 40/38mm MS Inspection Elbow. 1 No

28 ELEC-1.1.28 Supply of 50mm MS Inspection Elbow. 1 No

29 ELEC-1.1.29 Supply of MS Inspection 10 Guage G.I. checknut size 100 Nos


19/20mm.

30 ELEC-1.1.30 Supply of MS Inspection 10 Guage G.I. checknut size 25mm. 100 Nos

31 ELEC-1.1.31 Supply of MS Inspection 10 Guage G.I. checknut size 32mm. 100 Nos

32 ELEC-1.1.32 Supply of MS Inspection 10 Guage G.I.checknut size 100 Nos


40/38mm.

33 ELEC-1.1.33 Supply of MS Inspection 10 Guage G.I. checknut size 50mm. 100 Nos

34 ELEC-1.1.34 Supply of 19/20mm Saddles with Base. 100 Nos

35 ELEC-1.1.35 Supply of 25mm Saddles with Base. 100 Nos

36 ELEC-1.1.36 Supply of 32mm Saddles with Base. 100 Nos

37 ELEC-1.1.37 Supply of 40/38mm Saddles with Base. 100 Nos

38 ELEC-1.1.38 Supply of 50mm Saddles with Base. 100 Nos

39 ELEC-1.1.39 Supply of 19/20mm 20 guage Saddles. 100 Nos

40 ELEC-1.1.40 Supply of 25mm 20 guage Saddles. 100 Nos

41 ELEC-1.1.41 Supply of 32mm 20 guage Saddles. 100 Nos

42 ELEC-1.1.42 Supply of 40/38mm 20 guage Saddles. 100 Nos

43 ELEC-1.1.43 Supply of 50mm 20 guage Saddles. 100 Nos

44 ELEC-1.1.44 Supply of 19/20mm 16 Guage socket coupler. 12 Nos

45 ELEC-1.1.45 Supply of 25mm 16 Guage socket coupler. 12 Nos

46 ELEC-1.1.46 Supply of 32mm 16 Guage socket coupler. 12 Nos


47 ELEC-1.1.47 Supply of 38mm 16 Guage socket coupler. 12 Nos

48 ELEC-1.1.48 Supply of 40mm 16 Guage socket coupler. 12 Nos

49 ELEC-1.1.49 Supply of 50mm 16 Guage socket coupler. 12 Nos

50 ELEC-1.1.50 Supply of 19mm Ball Socket. 12 Nos

51 ELEC-1.1.51 Supply of 25mm Ball Socket. 12 Nos

1.2 PVC CONDUIT PIPES


52 ELEC-1.2.1 Supply of ISI 20mm outer dia medium (1.55mm thickness) 1 Mtr
grade with IS:9537 part 3 regid PVC pipe of makes
Sudhakar / Maco Plast / Modi.

53 ELEC-1.2.2 Supply of ISI 20mm outer dia heavy (2.10mm thickness) 1 Mtr
grade with IS:9537 part 3 regid PVC pipe of makes
Sudhakar / Maco Plast / Modi.

54 ELEC-1.2.3 Supply of ISI 25mm outer dia medium (1.80mm thickness) 1 Mtr
grade with IS:9537 part 3 regid PVC pipe of makes
Sudhakar / Maco Plast / Modi.

55 ELEC-1.2.4 Supply of ISI 25mm outer dia heavy (2.20mm thickness) 1 Mtr
grade with IS:9537 part 3 regid PVC pipe of makes
Sudhakar / Maco Plast / Modi.

56 ELEC-1.2.5 Supply of ISI 32mm outer dia medium (2.10mm thickness) 1 Mtr
grade with IS:9537 part 3 regid PVC pipe of makes
Sudhakar / Maco Plast / Modi.
57 ELEC-1.2.6 Supply of ISI 40mm outer dia medium (2.30mm thickness) 1 Mtr
grade with IS:9537 part 3 regid PVC pipe of makes
Sudhakar / Maco Plast / Modi.
58 ELEC-1.2.7 Supply of ISI 50mm outer dia medium (2.85mm thickness) 1 Mtr
grade with IS:9537 part 3 regid PVC pipe of makes
Sudhakar / Maco Plast / Modi.

59 ELEC-1.2.8 Supply of Non - ISI 19mm 1.50mm thick regid PVC pipe of 1 Mtr
makes Million Plast / Sudhakar / Durga / Nandi / Sunlight /
Besto Plast.

60 ELEC-1.2.9 Supply of Non - ISI 25mm 1.80mm thick regid PVC pipe of 1 Mtr
makes Million Plast / Sudhakar / Durga / Nandi / Sunlight /
Besto Plast.

61 ELEC-1.2.10 Supply of Non - ISI 19/20mm width and 12.5mm height 1 Mtr
Casing and Caping makes :Modi with ISI

62 ELEC-1.2.11 Supply of Non - ISI 25mm width and 12.5mm height Casing 1 Mtr
and Caping makes :Modi with ISI

63 ELEC-1.2.12 Supply of Non - ISI 32mm width and 12.5mm height Casing 1 Mtr
and Caping makes :Modi with ISI

64 ELEC-1.2.13 Supply of Non - ISI 38/40mm width and 12.5mm height 1 Mtr
Casing and Caping makes :Modi with ISI
65 ELEC-1.2.14 Supply of Non - ISI 19/20mm width and 12.5mm height 1 Mtr
Casing and Caping makes :Dimond / Durga

66 ELEC-1.2.15 Supply of Non - ISI 25mm width and 12.5mm height Casing 1 Mtr
and Caping makes :Dimond / Durga

67 ELEC-1.2.16 Supply of 19/20mm PVC Flexible Pipe. 1 Mtr

68 ELEC-1.2.17 Supply of 25mm PVC Flexible Pipe. 1 Mtr

69 ELEC-1.2.18 Supply of 32mm PVC Flexible Pipe. 1 Mtr

70 ELEC-1.2.19 Supply of 40/38mm PVC Flexible Pipe. 1 Mtr

71 ELEC-1.2.20 Supply of 50mm PVC Flexible Pipe. 1 Mtr

72 ELEC-1.2.21 Supply of 19/20mm PVC Flexible Couplings. 1 No

73 ELEC-1.2.22 Supply of 25mm PVC Flexible Couplings. 1 No

74 ELEC-1.2.23 Supply of 32mm PVC Flexible Couplings. 1 No

75 ELEC-1.2.24 Supply of 40/38mm PVC Flexible Couplings. 1 No

76 ELEC-1.2.25 Supply of 50mm PVC Flexible Couplings. 1 No

77 ELEC-1.2.26 Supply of 19/20mm PVC Junction Boxes Normal. 1 No

78 ELEC-1.2.27 Supply of 25mm PVC Junction Boxes Normal. 1 No

79 ELEC-1.2.28 Supply of 32mm PVC Junction Boxes Normal. 1 No

80 ELEC-1.2.29 Supply of 40mm PVC Junction Boxes Normal. 1 No

81 ELEC-1.2.30 Supply of 50mm PVC Junction Boxes Normal. 1 No

82 ELEC-1.2.31 Supply of PVC Junction Boxes Deep size 19/20mm. 1 No

83 ELEC-1.2.32 Supply of PVC Junction Boxes Deep size 25mm. 1 No

84 ELEC-1.2.33 Supply of PVC Junction Boxes Deep size 32mm. 1 No

85 ELEC-1.2.34 Supply of PVC Junction Boxes Deep size 40/38mm. 1 No

86 ELEC-1.2.35 Supply of PVC Junction Boxes Deep size 50mm. 1 No

87 ELEC-1.2.36 Supply of 19/20mm dia 1.5mm thick PVC Bends of Sudhakar 1 No


make.

88 ELEC-1.2.37 Supply of 25mm dia 1.5mm thick PVC Bends of Sudhakar 1 No


make.

89 ELEC-1.2.38 Supply of 32mm dia 2.0mm thick PVC Bends of Sudhakar 1 No


make.

90 ELEC-1.2.39 Supply of 40mm dia 2.0mm thick PVC Bends of Sudhakar 1 No


make.
91 ELEC-1.2.40 Supply of 50mm dia 2.0mm thick PVC Bends of Sudhakar 1 No
make.

92 ELEC-1.2.41 Dummy Cover to PVC junction boxes 1 No

1.3 HOT DIP GALVANIZED METAL BOXES


100 ELEC-1.3.1 Supply of 1 or 2 Module box 1 No

101 ELEC-1.3.2 Supply of 3 Module box 1 No

102 ELEC-1.3.3 Supply of 4 Module box 1 No

103 ELEC-1.3.4 Supply of 6 Module box 1 No

104 ELEC-1.3.5 Supply of 8 or 9 Module box Horizontal/Vertical. 1 No

105 ELEC-1.3.6 Supply of 12 Module box vertical. 1 No

METALLIC BOXES
106 ELEC-1.3.7 Supply of 4" x 4" Metal Box 1 No

107 ELEC-1.3.8 Supply of 4" x 7" Metal Box 1 No

108 ELEC-1.3.9 Supply of 6" x 6" Metal Box 1 No

109 ELEC-1.3.10 Supply of 6" x 8" Metal Box 1 No

110 ELEC-1.3.11 Supply of 10" x 8" Metal Box 1 No

111 ELEC-1.3.12 Supply of 10" x 12" Metal Box 1 No

1.4 T.W. BOARDS


112 ELEC-1.4.1 Supply of T.W.Board of Size 4" x 4" 1 No

113 ELEC-1.4.2 Supply of T.W.Board of Size 4" x 7" 1 No

114 ELEC-1.4.3 Supply of T.W.Board of Size 6" x 6" 1 No

115 ELEC-1.4.4 Supply of T.W.Board of Size 6" x 8" 1 No

116 ELEC-1.4.5 Supply of T.W.Board of Size 8" x 10" 1 No

117 ELEC-1.4.6 Supply of T.W.Board of Size 10" x 12" 1 No

118 ELEC-1.4.7 Supply of T.W.Board of Size 12" x 15" 1 No

SWITCH BOARDS
119 ELEC-1.4.8 Supply of Decolam Board of Size 4" x 4" 1 No

120 ELEC-1.4.9 Supply of Decolam Board of Size 4" x 7" 1 No

121 ELEC-1.4.10 Supply of Decolam Board of Size 6" x 6" 1 No

122 ELEC-1.4.11 Supply of Decolam Board of Size 6" x 8" 1 No

123 ELEC-1.4.12 Supply of Decolam Boardof Size 8" x 10" 1 No


124 ELEC-1.4.13 Supply of Decolam Board of Size 10" x 12" 1 No

125 ELEC-1.4.14 Supply of Decolam Board of Size 12" x 15" 1 No

126 ELEC-1.4.15 Supply of Peeta Board of Size 9" x 14" 1 No

127 ELEC-1.4.16 Supply of Peeta Board of Size 12" x 10" 1 No

128 ELEC-1.4.17 Supply of Peeta Board of Size 15" x 20" 1 No

129 ELEC-1.4.18 Supply of Peeta Board of Size 18" x 24" 1 No

130 ELEC-1.4.19 Supply of Peeta Board of Size 18" x 30" 1 No

131 ELEC-1.4.20 Supply of No.8 Screws of 12mm. 100 Nos

132 ELEC-1.4.21 Supply of No.8 Screws of 25mm. 100 Nos

133 ELEC-1.4.22 Supply of No.8 Screws of 30mm. 100 Nos

134 ELEC-1.4.23 Supply of No.8 Screws of 35/38mm. 100 Nos

135 ELEC-1.4.24 Supply of No.8 Screws of 50mm. 100 Nos

136 ELEC-1.4.25 Supply of No.8 Screws of 63/75mm. 100 Nos

1.5 COPPER FLEXIBLE CABLES


(AS PER IS:694)

137 ELEC-1.5.1 Supply of 14/0.3mm (1.0 Sqmm) FRLS / HFFR PVC 100 Mtrs
insulated 1100V grade as perIS:694/1990 specification for
Copper cable of makes Finolex / RR kabel / Havells

ELEC-1.5.2 Supply of 22/0.3mm (1.5 Sqmm) FRLS / HFFR PVC 100 Mtrs
insulated 1100V grade as perIS:694/1990 specification for
Copper cable of makes Finolex / RR kabel / Havells

ELEC-1.5.3 Supply of 36/0.3mm (2.5 Sqmm) FRLS / HFFR PVC 100 Mtrs
insulated 1100V grade as perIS:694/1990 specification for
Copper cable of makes Finolex / RR kabel /Havells

138 ELEC-1.5.4 Supply of 56/0.3mm (4.0 Sqmm) FRLS / HFFR PVC 100 Mtrs
insulated 1100V grade as perIS:694/1990 specification for
Copper cable of makes Finolex / RR kabel /Havells

ELEC-1.5.5 Supply of 84/0.3mm (6.0 Sqmm) FRLS / HFFR PVC 100 Mtrs
insulated 1100V grade as perIS:694/1990 specification for
Copper cable of makes Finolex / RR kabel / Havells

ELEC-1.5.6 Supply of 140/0.3mm (10.0 Sqmm) PVC FRLS / HFFR 100 Mtrs
insulated flexible Copper cable of makes Finolex / RR kabel /
Havells

139 ELEC-1.5.7 Supply of 126/0.4mm (16.0 Sqmm) PVC FRLS / HFFR 100 Mtrs
insulated flexible Copper cable of makes Finolex / RR kabel /
Havells
ELEC-1.5.8 Supply of 14/0.3mm (1.0 Sqmm) FRLS PVC insulated 1100V 100 Mtrs
grade as perIS:694/1990 specification for Copper cable of
makes Ploycab / Havells / Sun Cab / Gold Medal / Million /
Fortune Art / Paragon / HPL / L&T / Power Flex / RPG /
Anchor / Bonton.

ELEC-1.5.9 Supply of 22/0.3mm (1.5 Sqmm) FRLS PVC insulated 1100V 100 Mtrs
grade as perIS:694/1990 specification for Copper cable of
makes Ploycab / Havells / Sun Cab / Gold Medal / Million /
Fortune Art / Paragon / HPL / L&T / Power Flex / RPG /
Anchor / Bonton.

140 ELEC-1.5.10 Supply of 36/0.3mm (2.5 Sqmm) FRLS PVC insulated 1100V 100 Mtrs
grade as perIS:694/1990 specification for Copper cable of
makes Ploycab / Havells / Sun Cab / Gold Medal / Million /
Fortune Art / Paragon / HPL / L&T / Power Flex / RPG /
Anchor / Bonton.

ELEC-1.5.11 Supply of 56/0.3mm (4.0 Sqmm) FRLS PVC insulated 1100V 100 Mtrs
grade as perIS:694/1990 specification for Copper cable of
makes Ploycab / Havells / Sun Cab / Gold Medal / Million /
Fortune Art / Paragon / HPL / L&T / Power Flex / RPG /
Anchor / Bonton.

ELEC-1.5.12 Supply of 84/0.3mm (6.0 Sqmm) FRLS PVC insulated 1100V 100 Mtrs
grade as perIS:694/1990 specification for Copper cable of
makes Ploycab / Havells / Sun Cab / Gold Medal / Million /
Fortune Art / Paragon / HPL / L&T / Power Flex / RPG /
Anchor / Bonton.

141 ELEC-1.5.13 Supply of 140/0.3mm (10.0 Sqmm) FRLS PVC insulated 100 Mtrs
flexible Copper cable of makes Ploycab / Havells / Sun Cab /
Gold Medal / Million / Fortune Art / Paragon / HPL / L&T /
Power Flex / RPG / Anchor / Bonton.

ELEC-1.5.14 Supply of 126/0.4mm (16.0 Sqmm) PVC FRLS insulated 100 Mtrs
flexible Copper cable of makes Ploycab / Havells / Sun Cab /
Gold Medal / Million / Fortune Art / Paragon / HPL / L&T /
Power Flex / RPG / Anchor / Bonton.

ELEC-1.5.15 Supply of 14/0.3mm (1.0 Sqmm) FR / FRLS PVC insulated 100 Mtrs
1100V grade as perIS:694/1990 specification for Copper
cable of makes Pawancab / Nakoda / Star / Milltec / Fine
Cab / Payal / Sunlight / Bentec / Gemscab / Vimal / V-Guard /
Standard / Gloster.

142 ELEC-1.5.16 Supply of 22/0.3mm (1.5 Sqmm)FR / FRLS PVC insulated 100 Mtrs
1100V grade as perIS:694/1990 specification for Copper
cable of makes Pawancab / Nakoda / Star / Milltec / Fine
Cab / Payal / Sunlight / Bentec / Gemscab / Vimal / V-Guard /
Standard / Gloster.
ELEC-1.5.17 Supply of 36/0.3mm (2.5 Sqmm) FR / FRLS PVC insulated 100 Mtrs
1100V grade as perIS:694/1990 specification for Copper
cable of makes Pawancab / Nakoda / Star / Milltec / Fine
Cab / Payal / Sunlight / Bentec / Gemscab / Vimal / V-Guard /
Standard / Gloster.

ELEC-1.5.18 Supply of 56/0.3mm (4.0 Sqmm) FR / FRLS PVC insulated 100 Mtrs
1100V grade as perIS:694/1990 specification for Copper
cable of makes Pawancab / Nakoda / Star / Milltec / Fine
Cab / Payal / Sunlight / Bentec / Gemscab / Vimal / V-Guard /
Standard / Gloster.

143 ELEC-1.5.19 Supply of 84/0.3mm (6.0 Sqmm) FR / FRLS PVC insulated 100 Mtrs
1100V grade as perIS:694/1990 specification for Copper
cable of makes Pawancab / Nakoda / Star / Milltec / Fine
Cab / Payal / Sunlight / Bentec / Gemscab / Vimal / V-Guard /
Standard / Gloster.

ELEC-1.5.20 Supply of 140/0.3mm (10.0 Sqmm) FR / FRLS PVC insulated 100 Mtrs
1100V grade as perIS:694/1990 specification for Copper
cable of makes Pawancab / Nakoda / Star / Milltec / Fine
Cab / Payal / Sunlight / Bentec / Gemscab / Vimal / V-Guard /
Standard / Gloster.

ELEC-1.5.21 Supply of 126/0.4mm (16.0 Sqmm) FR / FRLS PVC insulated 100 Mtrs
1100V grade as perIS:694/1990 specification for Copper
cable of makes Pawancab / Nakoda / Star / Milltec / Fine
Cab / Payal / Sunlight / Bentec / Gemscab / Vimal / V-Guard /
Standard / Gloster.

SHEATHED FLEXIBLE CABLES


ELEC-1.5.8 Supply of ...... PVC Insulated Flexible Armouring Flexible
Copper cable...... Core Including all Transporting charges etc
complete. Makes : Finolex / RR kabel / Havells / Polycab /
RPG / KEI / Nakoda
1 a 25Sqmm single core 1 Mtrs

2 b 35Sqmm single core 1 Mtrs

3 c 50Sqmm single core 1 Mtrs

4 d 70Sqmm single core 1 Mtrs

5 e 1.5 Sqmm (22/0.3mm) 2 core 1 Mtrs

6 f 2.5 Sqmm (36/0.3mm) 2 core 1 Mtrs

7 g 4 Sqmm (56/0.3mm) 2 core 1 Mtrs

8 h 6 Sqmm (84/0.3mm) 2 core 1 Mtrs

9 i 4 Sqmm (56/0.3mm) 2 core 1 Mtrs

j 6 Sqmm (84/0.3mm) 2 core 1


10 k 10 Sqmm (80/0.4mm) 2 core 1 Mtrs

11 l 16 Sqmm (126/0.4mm) 2 core 1 Mtrs

12 m 1.5 Sqmm (22/0.3mm) 3 core 1 Mtrs

13 n 2.5 Sqmm (36/0.3mm) 3 core 1 Mtrs

14 o 4 Sqmm (56/0.3mm) 3 core 1 Mtrs

15 p 6 Sqmm (84/0.3mm) 3 core 1 Mtrs

16 q 10 Sqmm (80/0.4mm) 3 core 1 Mtrs

17 r 16 Sqmm (126/0.4mm) 3 core 1 Mtrs

18 s 1.5 Sqmm (22/0.3mm) 4 core 1 Mtrs

19 t 2.5 Sqmm (36/0.3mm) 4 core 1 Mtrs

20 u 4 Sqmm (56/0.3mm) 4 core 1 Mtrs

21 v 6 Sqmm (84/0.3mm) 4 core 1 Mtrs

22 w 10 Sqmm (80/0.4mm) 4 core 1 Mtrs

x 16 Sqmm (126/0.4mm) 4 core 1 Mtrs

y 25 Sqmm (196/0.4mm) 4 core 1 Mtrs

z 35 Sqmm (276/0.4mm) 4 core 1 Mtrs

aa 50 Sqmm (396/0.4mm) 4 core 1 Mtrs

ab 70 Sqmm (354/0.4mm) 4 core 1 Mtrs

1.5.9 Supply of ...... PVC Insulated Flexible Armouring Flexible


Copper cable...... Core Including all Transporting charges etc
complete. Makes : Finolex / RR kabel / Havells / Polycab /
RPG / KEI / Nakoda
a 4 Sqmm (56/0.3mm) 2 core 1 Mtrs

b 6 Sqmm (84/0.3mm) 2 core 1 Mtrs

c 10 Sqmm (80/0.4mm) 2 core 1 Mtrs

d 16 Sqmm (126/0.4mm) 2 core 1 Mtrs

e 4 Sqmm (56/0.3mm) 3 core 1 Mtrs

f 6 Sqmm (84/0.3mm) 3 core 1 Mtrs

g 10 Sqmm (80/0.4mm) 3 core 1 Mtrs

h 16 Sqmm (126/0.4mm) 3 core 1 Mtrs

i 2.5 Sqmm (36/0.3mm) 4 core 1 Mtrs


j 4 Sqmm (56/0.3mm) 4 core 1 Mtrs

k 6 Sqmm (84/0.3mm) 4 core 1 Mtrs

l 10 Sqmm (80/0.4mm) 4 core 1 Mtrs

m 16 Sqmm (126/0.4mm) 4 core 1 Mtrs

n 25 Sqmm (196/0.4mm) 4 core 1 Mtrs

o 35 Sqmm (276/0.4mm) 4 core 1 Mtrs

p 50 Sqmm (396/0.4mm) 4 core 1 Mtrs

q 70 Sqmm (354/0.4mm) 4 core 1 Mtrs

1.6 SERVICE MAINS AND FLAT CABLE OF ISI FOR


SUBMERSIBLE MOTORS.
ELEC-1.6.1 Supply of 2.5 Sqmm WPSC (Weather Proof Single Core) ISI 100 Mtrs
Alluminium Wire Polycab / V-Guard / Million / Payal / Vimal.

ELEC-1.6.2 Supply of 6 Sqmm WPSC (Weather Proof Single Core) ISI 100 Mtrs
Alluminium Wire of makes Polycab / V-Guard / Million /
Payal / Nakoda / Vimal.

ELEC-1.6.3 Supply of 10 Sqmm WPSC (Weather Proof Single Core) ISI 100 Mtrs
Alluminium Wire of makes Polycab / Gold Medal / Million /
Payal / Nakoda.

ELEC-1.6.4 Supply of 16 Sqmm WPSC (Weather Proof Single Core) ISI 100 Mtrs
Alluminium Wire of makes Polycab / Gold Medal / Million /
Payal / Nakoda.
ELEC-1.6.5 Supply of 6 Sqmm WPTC (Weather Proof Twin Core) ISI 100 Mtrs
Alluminium Wire of makes Polycab / V-Guard / Million / Payal /
Nakoda / Vimal.
ELEC-1.6.6 Supply of 10 Sqmm WPTC (Weather Proof Twin Core) ISI 100 Mtrs
Alluminium Wire of makes Polycab / Gold Medal / Million /
Payal / Nakoda.

ELEC-1.6.7 Supply of 16 Sqmm WPTC (Weather Proof Twin Core) ISI 100 Mtrs
Alluminium Wire of makes Polycab / Gold Medal / Million /
Payal / Nakoda.

ELEC-1.6.8 Supply of 23 / 0060 twin core twisted / flat heavy Copper wire 100 Mtrs
of makes Polycab / Gold Medal / Million / Payal /Nakoda.

ELEC-1.6.9 Supply of 3 Core 1.5 Sqmm Flat Copper cable of ISI for 100 Mtrs
Submersible Motors of makes Polycab / Gold Medal /
Million / Payal / Nakoda.

ELEC-1.6.10 Supply of 3 Core 2.5 Sqmm Flat Copper cable as per IS 100 Mtrs
694:1990 for Submersible Motors of makes Polycab / Gold
Medal / Million / Payal / Havells / Nakoda.
ELEC-1.6.11 Supply of 3 Core 4.0 Sqmm Flat Copper cable as per IS 100 Mtrs
694:1990 for Submersible Motors of makes Polycab / Gold
Medal / Million / Payal / Havells / Nakoda.

ELEC-1.6.12 Supply of 3 Core 6.0 Sqmm Flat Copper cable as per IS 100 Mtrs
694:1990 for Submersible Motors of makes Polycab / Gold
Medal / Million / Payal / Havells / Nakoda.

ELEC-1.6.13 Supply of 3 Core 10.0 Sqmm Flat Copper cable as per IS 100 Mtrs
694:1990 for Submersible Motors of makes Polycab / Gold
Medal / Million / Payal / Havells / Nakoda.

ELEC-1.6.14 Supply of 3 Core 1.5 Sqmm Flat Copper cable of ISI for 100 Mtrs
Submersible Motors of makes Finolex / RR Kabel / Havells /
Vimal

ELEC-1.6.15 Supply of 3 Core 2.5 Sqmm Flat Copper cable as per IS 100 Mtrs
694:1990 for Submersible Motors of makes Finolex / RR
Kabel / Havells / Vimal

ELEC-1.6.16 Supply of 3 Core 4.0 Sqmm Flat Copper cable as per IS 100 Mtrs
694:1990 for Submersible Motors of makes Finolex / RR
Kabel / Havells / Vimal

ELEC-1.6.17 Supply of 3 Core 6.0 Sqmm Flat Copper cable as per IS 100 Mtrs
694:1990 for Submersible Motors of makes Finolex / RR
Kabel / Havells / Vimal

ELEC-1.6.18 Supply of 3 Core 10.0 Sqmm Flat Copper cable as per IS 100 Mtrs
694:1990 for Submersible Motors of makes Finolex / RR
Kabel / Havells / Vimal

FLUSH TYPE SWITCHES AND ACCESSORIES


23 ELEC-1.7.1 Supply of 6A 1 Way flush type Swich of makes Gold Medal 1 No
Olive / Million Zoom / Anchor Penta Cherry.

24 ELEC-1.7.2 Supply of 6A 2 Way flush type Swich of makes Gold Medal 1 No


Olive / Million Zoom / Anchor Penta Cherry.

25 ELEC-1.7.3 Supply of 6A 2 pin flush type Socket of makes Gold Medal 1 No


Olive / Million Zoom / Anchor Penta Cherry.

26 ELEC-1.7.4 Supply of 6A 3/2 pin flush type Socket with shutter of makes 1 No
Gold Medal Olive/ Million Zoom /Anchor Penta Cherry.

27 ELEC-1.7.5 Supply of 6A flush type Neon Indicator of makes Gold 1 No


Medal Olive / Million Zoom / Anchor Penta Cherry.

28 ELEC-1.7.6 Supply of 6A Triangle Plug Top of makes Gold Medal Olive / 1 No


Million Zoom / Anchor Penta Cherry.
29 ELEC-1.7.7 Supply of 6A 1 Way flush type Bed Swich /Bell Push of makes 1 No
Gold Medal Olive/Million Zoom/Anchor Penta Cherry.

30 ELEC-1.7.8 Supply of 16A flush type Swich of makes Gold Medal Olive 1 No
/Million Zoom / Anchor Penta Cherry.

31 ELEC-1.7.9 Supply of 16A flush type Socket with shutter of makes Gold 1 No
Medal Olive / Million Zoom / Anchor Penta Cherry.

32 ELEC-1.7.10 Supply of 16A flush type Switch Socket combined (2 in one) 1 No


of makes Gold Medal Olive / Million Zoom / Anchor Penta
Cherry.

33 ELEC-1.7.11 Supply of 16A Triangle Plug Top of makes Gold Medal Olive 1 No
/ Million Zoom / Anchor Penta Cherry.

34 ELEC-1.7.12 Supply of stepped type Electronic Regulator of makes Gold 1 No


Medal Olive / Million Zoom / Anchor Penta Cherry.

35 ELEC-1.7.13 Supply of 3 Plate Jumbo Ceiling Rose of makes Anchor / 1 No


Gold Medal Olive / Million Zoom.

36 ELEC-1.7.14 Supply of BH / SBH of makes Anchor / Gold Medal Olive / 1 No


Million Zoom.

37 ELEC-1.7.15 Supply of Pendent Holder / Adopter of makesAnchor / Gold 1 No


Medal Olive / Million Zoom.

38 ELEC-1.7.16 Supply of Telephone Jack with Connector of makes Gold 1 No


Medal Olive / Million Zoom / Anchor Penta Cherry.

39 ELEC-1.7.17 Supply of TV Antenna Outlet of makes Gold Medal Olive / 1 No


Million Zoom / Anchor Penta Cherry.

40 ELEC-1.7.18 Supply of 15A/10A Flush type Fuse of makes Gold Medal / 1 No


Million / Vimal / Maru Mantero / Anchor Penta Cherry.

41 ELEC-1.7.19 Supply of 32A DP Flush type of makes Gold Medal / Million 1 No


/ Anchor Penta Cherry.

42 ELEC-1.7.20 Supply of Calling Bell of makes Anchor / Gold Medal / 1 No


Million / Vimal / Maru.

43 ELEC-1.7.21 Supply of Buzzer of makes Anchor / Gold Medal / Million / 1 No


Vimal / Maru.
44 ELEC-1.7.22 Supply of Ding Dong Bell of makes Anchor / Gold Medal / 1 No
Million / Vimal / Maru.

45 ELEC-1.7.23 Supply of Electronic Musical Bell of makes Anchor / Gold 1 No


Medal / Million / Vimal / Maru.

46 ELEC-1.7.24 Supply of Remote Bell of makes Anchor / Gold Medal / 1 No


Million / Vimal / Maru.

47 ELEC-1.7.25 Supply of MC Holder of makes Anchor / Gold Medal / 1 No


Million / Vimal / Maru.

48 ELEC-1.7.26 Supply of Spike Guard with 1 No Switch and 4 Nos Sockets 1 No


of makes Anchor / Gold Medal / Million / Vimal / Maru.

49 ELEC-1.7.27 Supply of Spike Guard with 4 No Switches and 4 Nos 1 No


Sockets of makes Anchor / Gold Medal / Million / Vimal /
Maru.

50 ELEC-1.7.28 Supply of 6A 1 Way flush type Swich of makes Milltec / 1 No


Vimal opel / Maru Mantero / Starex Smile / CPL.

51 ELEC-1.7.29 Supply of 6A 2 Way flush type Swich of makes Milltec / Vimal 1 No


opel / Maru Mantero / Starex Smile / CPL.

52 ELEC-1.7.30 Supply of 6A 2 pin flush type Socket of makes Milltec / 1 No


Vimal opel / Maru Mantero / Starex Smile / CPL.

53 ELEC-1.7.31 Supply of 6A 3/2 pin flush type Socket with shutter of 1 No


makes Milltec / Vimal opel / Maru Mantero / Starex Smile /
CPL.

54 ELEC-1.7.32 Supply of 6A flush type Neon Indicator of makes Milltec / 1 No


Vimal opel / Maru Mantero / Starex Smile / CPL.

55 ELEC-1.7.33 Supply of 6A Triangle Plug Top of makes Milltec / Vimal opel / 1 No


Maru Mantero / Starex Smile / CPL.

56 ELEC-1.7.34 Supply of 6A 1 Way flush type Bed Swich / Bell Push of 1 No


makes Milltec / Vimal opel / Maru Mantero / Starex Smile /
CPL.

57 ELEC-1.7.35 Supply of 16A flush type Swich of makes Milltec / Vimal 1 No


opel / Maru Mantero / Starex Smile / CPL.

58 ELEC-1.7.36 Supply of 16A flush type Socket with shutter of makes 1 No


Milltec / Vimal opel / Maru Mantero / Starex Smile / CPL.

59 ELEC-1.7.37 Supply of 16A flush type Switch Socket combined (2 in one) 1 No


of makes Milltec / Vimal opel / Maru Mantero / Starex Smile
/ CPL.
60 ELEC-1.7.38 Supply of 16A Triangle Plug Top of makes Milltec / Vimal 1 No
opel / Maru Mantero / Starex Smile / CPL.

61 ELEC-1.7.39 Supply of stepped type Electronic Regulator of makes 1 No


Milltec / Vimal opel / Maru Mantero / Starex Smile / CPL.

62 ELEC-1.7.40 Supply of 3 Plate Jumbo Ceiling Rose of makes Milltec / 1 No


Vimal opel / Maru Mantero / Starex Smile / CPL.

63 ELEC-1.7.41 Supply of 32A DP Flush type of makes Milltec / Vimal / 1 No


Maru / Star.

1.8 MINI MODULAR SWITCHES AND ACCESSORIES


64 ELEC-1.8.1 Supply of 6A 1 Way Mini Modular Switch with Cover Frame 1 No
of makes GM / Anchor Excel / Gold Medal / Million / Vimal
/ Maru / Milltec / CPL.

65 ELEC-1.8.2 Supply of 6A 2 Way Mini Modular Switch with Cover Frame 1 No


of makes GM / Anchor Excel / Gold Medal / Million / Vimal
/ Maru / Milltec / CPL.

66 ELEC-1.8.3 Supply of 6A 2 Pin Mini Modular Socket with Cover Frame 1 No


of makes GM / Anchor Excel / Gold Medal / Million / Vimal
/ Maru / Milltec / CPL.

67 ELEC-1.8.4 Supply of 6A 3/2 Pin Mini Modular Socket with Cover 1 No


Frame of makes GM / Anchor Excel / Gold Medal / Million /
Vimal / Maru / Milltec / CPL.

68 ELEC-1.8.5 Supply of 6A Mini Modular Neon Indicator with Cover 1 No


Frame of makes GM / Anchor Excel / Gold Medal / Million /
Vimal / Maru / Milltec / CPL.

69 ELEC-1.8.6 Supply of 6A Mini Modular Bed Switch / Bell Push with 1 No


Cover Frame of makes GM / Anchor Excel / Gold Medal /
Million / Vimal / Maru / Milltec / CPL.

70 ELEC-1.8.7 Supply of 6A 1 Way Mini Modular Switch with Neon 1 No


Indicator with Cover Frame of makes GM / Anchor Excel /
Gold Medal / Million / Vimal / Maru / Milltec / CPL.

71 ELEC-1.8.8 Supply of 6A Mini Modular Bell Push with Neon Indicator 1 No


with Cover Frame of makes GM / Anchor Excel / Gold
Medal / Million / Vimal / Maru / Milltec / CPL.

72 ELEC-1.8.9 Supply of 16A Mini Modular Switch with Cover Frame of 1 No


makes GM / Anchor Excel / Gold Medal / Million / Vimal / Maru
/ Milltec / CPL.
73 ELEC-1.8.10 Supply of 16A (2 in one) Mini Modular Switch & Socket 1 No
combined with Cover Frame of makes GM / Anchor Excel /
Gold Medal / Million / Vimal / Maru / Milltec / CPL.

74 ELEC-1.8.11 Supply of 16A Triangle Top with Cover Frame of makes GM 1 No


/ Anchor Excel / Gold Medal / Million / Vimal / Maru / Milltec /
CPL.

75 ELEC-1.8.12 Supply of Mini Modular Stepped type Electronic Regulator 1 No


with Cover Frame of makes GM / Anchor Excel / Gold
Medal / Million / Vimal / Maru / Milltec / CPL.

76 ELEC-1.8.13 Supply of Mini Modular Telephone Jack with Connector 1 No


with Cover Frame of makes GM / Anchor Excel / Gold
Medal / Million / Vimal / Maru / Milltec / CPL.

77 ELEC-1.8.14 Supply of Mini Modular TV Antenna Outlet with Cover 1 No


Frame of makes GM / Anchor Excel / Gold Medal / Million /
Vimal / Maru / Milltec / CPL.

78 ELEC-1.8.15 Supply of 16A/10A Mini Modular Flush Fuse with Cover 1 No


Frame of makes GM / Anchor Excel / Gold Medal / Million /
Vimal / Maru / Milltec / CPL.

1.9 MODULAR SWITCHES AND ACCESSORIES


79 ELEC-1.9.1 Supply of 6A / 10A 1 Way Modular Switch of Legrand 1 No
Arteor / MK Blenge / Schneider Zen celo

80 ELEC-1.9.2 Supply of 6A / 10A 2 Way Modular Switch of Legrand 1 No


Arteor / MK Blenge / Schneider Zen celo

81 ELEC-1.9.3 Supply of 6A / 10A 2 Pin Modular Socket of Legrand Arteor 1 No


/ MK Blenge / Schneider Zen celo

82 ELEC-1.9.4 Supply of 6A / 10A 3/2 Pin Modular Socket with shutter of 1 No


Legrand Arteor / MK Blenge / Schneider Zen celo

83 ELEC-1.9.5 Supply of 6A / 10A Modular Switch with Neon Indicator of 1 No


Legrand Arteor / MK Blenge / Schneider Zen celo

84 ELEC-1.9.6 Supply of 6A / 10A Modular Bell Push with Neon Indicator 1 No


of Legrand Arteor / MK Blenge / Schneider Zen celo

85 ELEC-1.9.7 Supply of 16A / 10A Modular Flush Fuse with Neon 1 No


Indicator of Legrand Arteor / MK Blenge / Schneider Zen celo

86 ELEC-1.9.8 Supply of 16A / 20A 1 Way Modular Switch of Legrand 1 No


Arteor / MK Blenge / Schneider Zen celo
87 ELEC-1.9.9 Supply of 16A / 20A 2 Way Modular Switch of Legrand 1 No
Arteor / MK Blenge / Schneider Zen celo

88 ELEC-1.9.10 Supply of 20A 1 Way Modular Switch with Indicator of 1 No


Legrand Arteor / MK Blenge / Schneider Zen celo

89 ELEC-1.9.11 Supply of 20A Modular Socket with shutter of Legrand 1 No


Arteor / MK Blenge / Schneider Zen celo

90 ELEC-1.9.12 Supply of 16A/6A 1 way Combi Socket Modular Socket with 1 No


shutter of Legrand Arteor / MK Blenge / Schneider Zen celo

91 ELEC-1.9.13 Supply of 16A Triangle Top of Legrand Arteor / MK Blenge / 1 No


Schneider Zen celo

92 ELEC-1.9.14 Supply of 1Module Modular type Electronic step type fan 1 No


regulator of GM Four-Five/Legrand Arteor/Schneider
Zencelo/MK Blenge
93 ELEC-1.9.15 Supply of Modular Telephone jack with Connector of 1 No
Legrand Arteor / MK Blenge / Schneider Zen celo

94 ELEC-1.9.16 Supply of Modular TV Antenna outlet of Legrand Arteor / 1 No


MK Blenge / Schneider Zen celo

95 ELEC-1.9.17 Supply of 6A / 10A 1 Way Modular Switch of Cabtree 1 No


Thames Platinum / GM / Million / Anchor Roma viola /
Toyoma / L&T / Fortune Art / CPL.

96 ELEC-1.9.18 Supply of 6A / 10A 2 Way Modular Switch of Cabtree 1 No


Thames Platinum / GM / Million / Anchor Roma viola /
Toyoma / L&T / Fortune Art / CPL.

97 ELEC-1.9.19 Supply of 6A / 10A 2 Pin Modular Socket with shutter of 1 No


Cabtree Thames Platinum / GM / Million / Anchor Roma viola /
Toyoma / L&T / Fortune Art / CPL.

98 ELEC-1.9.20 Supply of 6A / 10A 3/2 Pin Modular Socket with shutter of 1 No


Cabtree Thames Platinum / GM / Million / Anchor Roma viola /
Toyoma / L&T / Fortune Art / CPL.

99 ELEC-1.9.21 Supply of 6A / 10A Modular Switch with Neon Indicator of 1 No


Cabtree Thames Platinum / GM / Million / Anchor Roma viola /
Toyoma / L&T / Fortune Art / CPL.

100 ELEC-1.9.22 Supply of 6A / 10A Modular Bell Push with Neon Indicator 1 No
of Cabtree Thames Platinum / GM / Million / Anchor Roma
viola / Toyoma / L&T / Fortune Art / CPL.

101 ELEC-1.9.23 Supply of 16A / 10A Modular Flush Fuse with Neon 1 No
Indicator of Cabtree Thames Platinum / GM / Million /
Anchor Roma viola / Toyoma / L&T / Fortune Art / CPL.
102 ELEC-1.9.24 Supply of 16A / 20A 1 Way Modular Switch of Cabtree 1 No
Thames Platinum / GM / Million / Anchor Roma viola /
Toyoma / L&T / Fortune Art / CPL.

103 ELEC-1.9.25 Supply of 16A / 20A 2 Way Modular Switch of Cabtree 1 No


Thames Platinum / GM / Million / Anchor Roma viola /
Toyoma / L&T / Fortune Art / CPL.

104 ELEC-1.9.26 Supply of 20A 1 Way Modular Switch with Indicator of 1 No


Cabtree Thames Platinum / GM / Million / Anchor Roma viola /
Toyoma / L&T / Fortune Art / CPL.

105 ELEC-1.9.27 Supply of 20A 2 Modular Socket with shutter of Cabtree 1 No


Thames Platinum / GM / Million / Anchor Roma viola /
Toyoma / L&T / Fortune Art / CPL.

106 ELEC-1.9.28 Supply of 16A/6A 1 way 2 Modular Combi Socket Modular 1 No


Socket with
shutter of Cabtree Thames Platinum / GM / Million /
Anchor Roma viola / Toyoma / L&T / Fortune Art / CPL.

107 ELEC-1.9.29 Supply of 16A Triangle Top of Cabtree Thames Platinum / GM 1 No


/ Million / Anchor Roma viola / Toyoma / L&T / Fortune Art /
CPL.

108 ELEC-1.9.30 Supply of Electronic Regulator of Modular of Cabtree 1 No


Thames Platinum / GM / Million / Anchor Roma viola /
Toyoma / L&T / Fortune Art / CPL.

109 ELEC-1.9.31 Supply of Modular Telephone jack with Connector of 1 No


Cabtree Thames Platinum / GM / Million / Anchor Roma viola /
Toyoma / L&T / Fortune Art / CPL.

110 ELEC-1.9.32 Supply of Modular Co-Axial Socket type TV Antenna outlet of 1 No


Cabtree Thames
Platinum / GM / Million / Anchor Roma viola / Toyoma / L&T /
Fortune Art / CPL.

111 ELEC-1.9.33 Supply of 1 or 2 Modular Cover Frame of Legrand Arteor / 1 No


MK Blenge / Schneider Zen celo

112 ELEC-1.9.34 Supply of 3 Modular Cover Frame of Legrand Arteor / MK 1 No


Blenge / Schneider Zen celo

113 ELEC-1.9.35 Supply of 4 Modular Cover Frame of Legrand Arteor / MK 1 No


Blenge / Schneider Zen celo

114 ELEC-1.9.36 Supply of 6 Modular Cover Frame of Legrand Arteor / MK 1 No


Blenge / Schneider Zen celo

115 ELEC-1.9.37 Supply of 8 Modular Horizontal / Vertical Cover Frame of 1 No


Legrand Arteor / MK Blenge / Schneider Zen celo

116 ELEC-1.9.38 Supply of 12 Modular Vertical Cover Frame of Legrand 1 No


Arteor / MK Blenge / Schneider Zen celo
117 ELEC-1.9.39 Supply of 1 or 2 Modular Cover Frame of Cabtree Thames 1 No
Platinum / GM / Million / Anchor Roma viola / Toyoma / L&T /
Fortune Art / CPL.

118 ELEC-1.9.40 Supply of 3 Modular Cover Frame of Cabtree Thames 1 No


Platinum / GM / Million / Anchor Roma viola / Toyoma / L&T /
Fortune Art / CPL.

119 ELEC-1.9.41 Supply of 4 Modular Cover Frame of Cabtree Thames 1 No


Platinum / GM / Million / Anchor Roma viola / Toyoma / L&T /
Fortune Art / CPL.

120 ELEC-1.9.42 Supply of 6 Modular Cover Frame of Cabtree Thames 1 No


Platinum / GM / Million / Anchor Roma viola / Toyoma / L&T /
Fortune Art / CPL.

121 ELEC-1.9.43 Supply of 8 Modular Horizontal / Vertical Cover Frame of 1 No


Cabtree Thames Platinum / GM / Million / Anchor Roma viola /
Toyoma / L&T / Fortune Art / CPL.

122 ELEC-1.9.44 Supply of 12 Modular Vertical Cover Frame of Cabtree 1 No


Thames Platinum / GM / Million / Anchor Roma viola /
Toyoma / L&T / Fortune Art / CPL.

SECTION - 2
2.1 PANEL MOUNTING SWITCH DISCONNECTOR FUSE
UNITS ( SDFU ) AS PER IS: 13947
123 ELEC-2.1.1 Supply of 32A TPN Switch Disconnector Fuse Unit Cubical 1 No
type without fuses of makes L&T/ G E / C&S / ABB /
SIEMENS

124 ELEC-2.1.2 Supply of 63A TPN Switch Disconnector Fuse Unit Cubical 1 No
type without fuses of makes L&T / G E / C&S / ABB /
SIEMENS

125 ELEC-2.1.3 Supply of 125A TPN Switch Disconnector Fuse Unit Cubical 1 No
type without fuses of makes L&T / G E / C&S / ABB /
SIEMENS

126 ELEC-2.1.4 Supply of 200A TPN Switch Disconnector Fuse Unit Cubical 1 No
type without fuses of makes L&T/ G E / C&S / ABB /
SIEMENS

127 ELEC-2.1.5 Supply of 250A TPN Switch Disconnector Fuse Unit Cubical 1 No
type without fuses of makes L&T / G E / C&S / ABB /
SIEMENS

128 ELEC-2.1.6 Supply of 400A TPN Switch Disconnector Fuse Unit Cubical 1 No
type without fuses of makes L&T / G E / C&S / ABB /
SIEMENS
129 ELEC-2.1.7 Supply of 630A TPN Switch Disconnector Fuse Unit Cubical 1 No
type without fuses of makes L&T / G E / C&S / ABB /
SIEMENS

130 ELEC-2.1.8 Supply of 32A TPN Switch Disconnector Fuse Unit Cubical 1 No
type without fuses of makes Standard / Crystal / Havells /
HPL.

131 ELEC-2.1.9 Supply of 63A TPN Switch Disconnector Fuse Unit Cubical 1 No
type without fuses of makes Standard / Crystal / Havells /
HPL.

132 ELEC-2.1.10 Supply of 125A TPN Switch Disconnector Fuse Unit Cubical 1 No
type without fuses of makes Standard / Crystal / Havells /
HPL.

133 ELEC-2.1.11 Supply of 200A TPN Switch Disconnector Fuse Unit Cubical 1 No
type without fuses of makes Standard / Crystal / Havells /
HPL.

134 ELEC-2.1.12 Supply of 250A TPN Switch Disconnector Fuse Unit Cubical 1 No
type without fuses of makes Standard / Crystal / Havells /
HPL.

135 ELEC-2.1.13 Supply of 400A TPN Switch Disconnector Fuse Unit Cubical 1 No
type without fuses of makes Standard / Crystal / Havells /

136 ELEC-2.1.14 Supply of 630A TPN Switch Disconnector Fuse Unit Cubical 1 No
type without fuses of makes Standard / Crystal / Havells /
HPL.

2.2 ON LOAD CHANGEOVER SWITCHES


(OPEN EXECUTION)
AS PER IS:13947
137 ELEC-2.2.1 Supply of 63A 4 Pole Change Over Switch on Load with 1 No
open Execution of makes HPL Socomec / L & T

138 ELEC-2.2.2 Supply of 125A 4 Pole Change Over Switch on Load with 1 No
open Execution of makes HPL Socomec / L & T

139 ELEC-2.2.3 Supply of 200A 4 Pole Change Over Switch on Load with 1 No
open Execution of makes HPL Socomec / L & T

140 ELEC-2.2.4 Supply of 250A 4 Pole Change Over Switch on Load with 1 No
open Execution of makes HPL Socomec / L & T

141 ELEC-2.2.5 Supply of 400A 4 Pole Change Over Switch on Load with 1 No
open Execution of makes HPL Socomec / L & T
142 ELEC-2.2.6 Supply of 630A 4 Pole Change Over Switch on Load with 1 No
open Execution of makes HPL Socomec / L & T

143 ELEC-2.2.7 Supply of 63A 4 Pole Change Over Switch on Load with 1 No
open Execution of makes ABB / GE / SIEMENS / Standard /
Crystal / Havells.

144 ELEC-2.2.8 Supply of 125A 4 Pole Change Over Switch on Load with 1 No
open Execution of makes ABB / GE / SIEMENS / Standard /
Crystal / Havells.

145 ELEC-2.2.9 Supply of 200A 4 Pole Change Over Switch on Load with 1 No
open Execution of makes ABB / GE / SIEMENS / Standard /
Crystal / Havells.

146 ELEC-2.2.10 Supply of 250A 4 Pole Change Over Switch on Load with 1 No
open Execution of makes ABB / GE / SIEMENS / Standard /
Crystal / Havells.

147 ELEC-2.2.11 Supply of 400A 4 Pole Change Over Switch on Load with 1 No
open Execution of makes ABB / GE / SIEMENS / Standard /
Crystal / Havells.

148 ELEC-2.2.12 Supply of 630A 4 Pole Change Over Switch on Load with 1 No
open Execution of makes ABB / GE / SIEMENS / Standard /
Crystal / Havells.

149 ELEC-2.2.13 Supply of 32A 4 Pole Change Over Switch on Load with 1 No
open Execution of makes ABB / GE / SIEMENS / Standard /
Crystal / Havells.

2.3 CHANGE OVER SWITCHES IN SS ENCLOUSURE AS PER


IS:13947
150 ELEC-2.3.1 Supply of 32A 240V DP Off load Changeover Switch in sheet 1 No
steel enclosure of makes HPL / Havells / Standard / Crystal.

151 ELEC-2.3.2 Supply of 63A 415V FP Off load Changeover Switch in sheet 1 No
steel enclosure of makes HPL / Havells / Standard. / Crystal.

152 ELEC-2.3.3 Supply of 100A 415V FP Off load Changeover Switch in 1 No


sheet steel enclosure of makes HPL / Havells / Standard /
Crystal.

153 ELEC-2.3.4 Supply of 32A 240V DP Off load Changeover Switch in sheet 1 No
steel enclosure of makes Million / Sputnik / Sunlight /
Bentec / Gold Medal / Star.

154 ELEC-2.3.5 Supply of 63A 415V FP Off load Changeover Switch in sheet 1 No
steel enclosure of makes Million / Sputnik / Sunlight /
Bentec / Gold Medal / Star.
155 ELEC-2.3.6 Supply of 100A 415V FP Off load Changeover Switch in 1 No
sheet steel enclosure of makes Million / Sputnik / Sunlight /
Bentec / Gold Medal.

2.4 REWIRABLE / DOUBLE BREAK SWITCHES IN SS


ENCLOSURE
AS PER IS:13947
156 ELEC-2.4.1 Supply of 32A 240V SPN Rewirable Fuse Switch in SS 1 No
enclosure of makes HPL / Havells / Standard

157 ELEC-2.4.2 Supply of 32A 415V TPN Rewirable Fuse Switch in SS 1 No


enclosure of makes HPL / Havells / Standard

158 ELEC-2.4.3 Supply of 63A 415V TPN Rewirable Fuse Switch in SS 1 No


enclosure of makes HPL / Havells / Standard

159 ELEC-2.4.4 Supply of 100A 415V TPN Rewirable Fuse Switch in SS 1 No


enclosure of makes HPL / Havells / Standard

160 ELEC-2.4.5 Supply of 100A 415V TPN Double Break Switch in SS 1 No


enclosure without fuses of makes HPL / Havells / Standard

161 ELEC-2.4.6 Supply of 200A 415V TPN Double Break Switch in SS 1 No


enclosure without fuses of makes HPL / Havells / Standard

162 ELEC-2.4.7 Supply of 32A 240V SPN Rewirable Fuse Switch in SS 1 No


enclosure of makes Crystal / Gold Medal / Million / Sputnik
/ Sunlight / Bentec / Star.

163 ELEC-2.4.8 Supply of 32A 415V TPN Rewirable Fuse Switch in SS 1 No


enclosure of makes Crystal / Gold Medal / Million / Sputnik
/ Sunlight / Bentec / Star.

164 ELEC-2.4.9 Supply of 63A 415V TPN Rewirable Fuse Switch in SS 1 No


enclosure of makes Crystal / Gold Medal / Million / Sputnik
/ Sunlight / Bentec / Star.

165 ELEC-2.4.10 Supply of 100A 415V TPN Rewirable Fuse Switch in SS 1 No


enclosure of makes Crystal / Gold Medal / Million / Sputnik
/ Sunlight / Bentec / Star.
166 ELEC-2.4.11 Supply of 100A 415V TPN Double Break Switch in SS 1 No
enclosure without fuse of makes Crystal / Gold Medal /
Million / Sputnik / Sunlight / Bentec.

167 ELEC-2.4.12 Supply of 200A 415V TPN Double Break Switch in SS 1 No


enclosure without fuse of makes Crystal / Gold Medal /
Million / Sputnik / Sunlight / Bentec.

2.5 HRC FUSE LINKS (BOLTED TYPE)


168 ELEC-2.5.1 Supply of up to 32A HRC Fuse Links of makes L & T / G E / 1 No
C & S / Standard / HPL / Havells.

169 ELEC-2.5.2 Supply of 32A to 63A HRC Fuse Links of makes L & T / G E / 1 No
C & S / Standard / HPL / Havells.

170 ELEC-2.5.3 Supply of 125A to 200A HRC Fuse Links of makes L & T / G 1 No
E/ C & S / Standard / HPL / Havells.

171 ELEC-2.5.4 Supply of 250A to 350A HRC Fuse Links of makes L & T / G 1 No
E/ C & S / Standard / HPL / Havells.

172 ELEC-2.5.5 Supply of 400A HRC Fuse Links of makes L & T / G E / C & 1 No
S/ Standard / HPL / Havells.

173 ELEC-2.5.6 Supply of 630A HRC Fuse Links of makes L & T / G E / C & S 1 No
/ Standard / HPL / Havells.

2.6 PORCELAIN REWIRABLE FUSE UNITS.


174 ELEC-2.6.1 Supply of 32A 240V Porcelain Rewirable Fuse Units of makes 1 No
Gold Medal / Million /HPL / Sputnik / Vimal / Standard /Star /
Sunlight / Crystal / Bentec

175 ELEC-2.6.2 Supply of 32A 415V Porcelain Rewirable Fuse Units of 1 No


makes Gold Medal / Million /HPL / Sputnik / Vimal /
Standard / Star / Sunlight / Crystal / Bentec

176 ELEC-2.6.3 Supply of 63A 415V Porcelain Rewirable Fuse Units of 1 No


makes Gold Medal / Million /HPL / Sputnik / Vimal / Standard
/ Star / Sunlight / Crystal / Bentec

177 ELEC-2.6.4 Supply of 100A 415V Porcelain Rewirable Fuse Units of 1 No


makes Gold Medal / Million /HPL / Sputnik / Vimal /
Standard / Star / Sunlight / Crystal / Bentec

178 ELEC-2.6.5 Supply of 200A 415V Porcelain Rewirable Fuse Units with 1 No
extension strip of makes Gold Medal / Million /HPL /
Sputnik / Vimal / Standard / Star / Sunlight / Crystal / Bentec

179 ELEC-2.6.6 Supply of 300A 415V Porcelain Rewirable Fuse Units with 1 No
extension strip of makes Gold Medal / Million /HPL / Sputnik /
Vimal / Standard / Star/ Sunlight / Crystal /Bentec

2.7 VOLTAGE SURGE PROTECTORS


180 ELEC-2.7.1 Supply of 2 Pole 2 Module 40 KA 1.4 KV Voltage Surge 1 No
Protector of make Legrand / L & T Hager / G E.

181 ELEC-2.7.2 Supply of 4 Pole 4 Module 40 KA 1.4 KV Voltage Surge 1 No


Protector of make Legrand / L & T Hager / G E.

182 ELEC-2.7.3 Supply of 2 Pole 2 Module 15 KA 1.2 KV Voltage Surge 1 No


Protector of make Legrand / L & T Hager / G E.

183 ELEC-2.7.4 Supply of 4 Pole 4 Module 15 KA 1.2 KV Voltage Surge 1 No


Protector of make Legrand / L & T Hager / G E.

2.8 PANEL MOUNTING MCCBs/ ACBs


Supply of 60A 3 Pole MCCB, Adjustable, Confirms to IS /
IEC 60947-2 having Breaking Capacity 25 KA with
thermal magnetic release Panel Mounted of makes L&T /
Schneider / Siemens.
184 ELEC-2.8.1 Supply of 63A / 60A 3 Pole MCCB, Adjustable, Confirms to 1 No
IS / IEC 60947-2 having Breaking Capacity 25 KA with
thermal magnetic release Panel Mounted of makes L&T /
Schneider / Siemens.
185 ELEC-2.8.2 Supply of 125A 3 Pole MCCB, Adjustable, Confirms to IS/IEC 1 No
60947-2 having Breaking Capacity 25 KA Panel Mounted of
makes L&T / Schneider / Siemens.

186 ELEC-2.8.3 Supply of 250A 3 Pole MCCB, Adjustable, Confirms to IS/IEC 1 No


60947-2 having Breaking Capacity 36/35 KA Panel Mounted
of makes L&T / Schneider / Siemens.

187 ELEC-2.8.4 Supply of 400A 3 Pole MCCB, Adjustable, Confirms to IS/IEC 1 No


60947-2 having Breaking Capacity 36/35 KA Panel Mounted
of makes L&T / Schneider / Siemens.

188 ELEC-2.8.5 Supply of 63A / 60A 4 Pole MCCB, Adjustable, Confirms to 1 No


IS/IEC 60947-2 having Breaking Capacity 25 KA Panel
Mounted of makes L&T / Schneider / Siemens.

189 ELEC-2.8.6 Supply of 125A 4 Pole MCCB, Adjustable, Confirms to IS/IEC 1 No


60947-2 having Breaking Capacity 25 KA Panel Mounted of
makes L&T / Schneider / Siemens.

190 ELEC-2.8.7 Supply of 250A 4 Pole MCCB, Adjustable, Confirms to IS/IEC 1 No


60947-2 having Breaking Capacity 35 KA Panel Mounted of
makes L&T (DN2-250N) / Schneider / Siemens.

191 ELEC-2.8.8 Supply of 400A 4 Pole MCCB, Adjustable, Confirms to IS/IEC 1 No


60947-2 having Breaking Capacity 50 KA Panel Mounted of
makes L&T / Schneider / Siemens.
192 ELEC-2.8.9 Supply of 63A /60A 3 Pole MCCB /Confirms to IS/IEC 60947- 1 No
2 having Breaking Capacity 25 KA Panel Mounted of makes
Legrand /GE / ABB / Havells / HPL / Standard / Crystal / Indo
Asian.

193 ELEC-2.8.10 Supply of 125A 3 Pole MCCB / Confirms to IS/IEC 60947-2 1 No


having Breaking Capacity 25 KA Panel Mounted of makes
Legrand / GE / ABB / Havells / HPL / Standard / Crystal / Indo
Asian.

194 ELEC-2.8.11 Supply of 250A 3 Pole MCCB / Confirms to IS/IEC 60947-2 1 No


having Breaking Capacity 36/35 KA Panel Mounted of
makes Legrand / GE / ABB / Havells / HPL / Standard /
Crystal / Indo Asian.

195 ELEC-2.8.12 Supply of 63A / 60A 4 Pole MCCB / Confirms to IS/IEC 1 No


60947-2 having Breaking Capacity 25 KA Panel Mounted of
makes Legrand / GE / ABB / Havells / HPL / Standard /
Crystal / Indo Asian.

196 ELEC-2.8.13 Supply of 125A 4 Pole MCCB / Confirms to IS/IEC 60947-2 1 No


having Breaking Capacity 25 KA Panel Mounted of makes
Legrand / GE / ABB / Havells / HPL / Standard / Crystal / Indo
Asian.

197 ELEC-2.8.14 Supply of 250A 4 Pole MCCB / Confirms to IS/IEC 60947-2 1 No


having Breaking Capacity 50 KA Panel Mounted of makes
Legrand / GE / ABB / Havells / HPL / Standard / Crystal / Indo
Asian.

198 ELEC-2.8.15 Supply of 400A 3 Pole MCCB / Confirms to IS/IEC 60947-2 1 No


having Breaking Capacity 50 KA Panel Mounted of makes
Legrand / GE / ABB / Havells / HPL / Standard / Crystal / Indo
Asian.

ELEC-2.8.16 Supply of 400A 4 Pole MCCB / Confirms to IS/IEC 60947-2 1 No


having Breaking Capacity 50 KA Panel Mounted of makes
Legrand / GE / ABB / Havells / HPL / Standard / Crystal / Indo
Asian.

PANEL MOUNTING ACBs (Microprocessor Based)


199 ELEC-2.8.16 Supply of 630A 3 Pole, 50kA Air Circuit Breaker electrically 1 No
fixed Confirms to IS 13947-2, IEC 60947-2 and BS-EN 60947
with Micro processer based having over load, shot circuit and
earth fault Protection of Siemens / L&T make.

200 ELEC-2.8.17 Supply of 630A 4 Pole, 50kA Air Circuit Breaker electrically 1 No
fixed Confirms to IS 13947-2, IEC 60947-2 and BS-EN 60947
with Micro processer based having over load, shot circuit and
earth fault Protection of Siemens / L&T make.
201 ELEC-2.8.18 Supply of 630A 3 Pole, 50kA Air Circuit Breaker electrically 1 No
drawout Confirms to IS 13947-2, IEC 60947-2 and BS-EN
60947 with Micro processer based having over load, shot
circuit and earth fault Protection of Siemens / L&T make.

202 ELEC-2.8.19 Supply of 630A 4 Pole, 50kA Air Circuit Breaker electrically 1 No
drawout Confirms to IS 13947-2, IEC 60947-2 and BS-EN
60947 with Micro processer based having over load, shot
circuit and earth fault Protection of Siemens / L&T make.

203 ELEC-2.8.20 Supply of 800A 3 Pole, 50kA Air Circuit Breaker electrically 1 No
drawout Confirms to IS 13947-2, IEC 60947-2 and BS-EN
60947 with Micro processer based having over load, shot
circuit and earth fault protection of makes Siemens / L&T /
Schneider make.

204 ELEC-2.8.21 Supply of 800A 4 Pole, 50kA Air Circuit Breaker electrically 1 No
drawout Confirms to IS 13947-2, IEC 60947-2 and BS-EN
60947 with Micro processer based having over load, shot
circuit and earth fault protection of makes Siemens / L&T /
Schneider make.

205 ELEC-2.8.22 Supply of 1000A 3 Pole, 50kA Air Circuit Breaker electrically 1 No
drawout Confirms to IS 13947-2, IEC 60947-2 and BS-EN
60947 with Micro processer based having over load, shot
circuit and earth fault protection of makes Siemens / L&T /
Schneider / ABB make.

206 ELEC-2.8.23 Supply of 1000A 4 Pole, 50kA Air Circuit Breaker electrically 1 No
drawout Confirms to IS 13947-2, IEC 60947-2 and BS-EN
60947 with Micro processer based having over load, shot
circuit and earth fault protection of makes Siemens / L&T /
Schneider / ABB make.

207 ELEC-2.8.24 Supply of 630A 3 Pole, 50kA Air Circuit Breaker electrically 1 No
fixed Confirms to IS 13947-2, IEC 60947-2 and BS-EN 60947
with Micro processer based having over load, shot circuit and
earth fault Protection of ABB / Legrand / HPL / Indo
Asian make.

208 ELEC-2.8.25 Supply of 630A 3 Pole, 50kA Air Circuit Breaker electrically 1 No
drawout Confirms to IS 13947-2, IEC 60947-2 and BS-EN
60947 with Micro processer based having over load, shot
circuit and earth fault Protection of ABB / Legrand / HPL / Indo
Asian make.
209 ELEC-2.8.26 Supply of 630A 4 Pole, 50kA Air Circuit Breaker electrically 1 No
fixed Confirms to IS 13947-2, IEC 60947-2 and BS-EN
60947 with Micro processer based having over load, shot
circuit and earth fault Protection of ABB / Legrand / HPL / Indo
Asian make.

210 ELEC-2.8.27 Supply of 630A 4 Pole, 50kA Air Circuit Breaker electrically 1 No
drawout Confirms to IS 13947-2, IEC 60947-2 and BS-EN
60947 with Micro processer based having over load, shot
circuit and earth fault Protection of ABB / Legrand / HPL / Indo
Asian make.

211 ELEC-2.8.28 Supply of 800A 3 Pole, 50kA Air Circuit Breaker electrically 1 No
drawout Confirms to IS 13947-2, IEC 60947-2 and BS-EN
60947 with Micro processer based having over load, shot
circuit and earth fault protection of makes ABB / GE / Legrand
/ HPL make.

212 ELEC-2.8.29 Supply of 800A 4 Pole, 50kA Air Circuit Breaker electrically 1 No
drawout Confirms to IS 13947-2, IEC 60947-2 and BS-EN
60947 with Micro processer based having over load, shot
circuit and earth fault protection of makes ABB / GE / Legrand
/ HPL make.

213 ELEC-2.8.30 Supply, instalation, testing and commisioning of 800 Amp, 1 No


50KA breaking capacity (100% Neutral busbar) air insulated
compact Raising mains system made of CRCA sheet
steel encloser of thickness not less than 1.5 mm having
degree of protection of IP 55 as per 2127. wall strapes,
fully PVC insulated four strip ALUMINIUM busbar in
convinent sections including , end feed unit, end cover
units suitable for 415 volts 3 phase, 4 wire, 50 Hz A.C.
System,etc., Makes:- Legrand / L&T / Seimens / Schiender /
GE make)

214 ELEC-2.8.31 Supply and Fixing of Spring suspension hanger for rising Main 1 No
for 400A / 800A Raising Mains. Makes:- Legrand / L&T /
Seimens / Schiender / GE make)

215 ELEC-2.8.32 Supply and Fixing of Suspension brackets for rising main for 1 No
400A / 800A Raising Mains Makes:- Legrand / L&T / Seimens
/ Schiender / GE make)

216 ELEC-2.8.33 Supply and Fixing of 800 Amps Horizontal / Vertical bends 1 No
Makes:- Legrand / L&T / Seimens / Schiender / GE make)

217 ELEC-2.8.34 Supply and Fixing of Adopter box for 400A / 800A Raising 1 No
Mains Makes:- Legrand / L&T / Seimens / Schiender / GE
make)

218 ELEC-2.8.35 Supply and Fixing of 800 Amps Copper Flexibles for three 1 No
phases and neutral Makes:- Legrand / L&T / Seimens /
Schiender / GE make)
219 ELEC-2.8.36 Supply, instalation, testing and commisioning of 400 Amp, 1 No
50KA breaking capacity (100% Neutral busbar) air
insulated compact Raising mains system made of CRCA
sheet steel encloser of thickness not less than 1.5 mm having
degree of protection of IP 55 as per 2127. wall strapes, fully
PVC insulated four strip ALUMINIUM busbar in convinent
sections including required end feed unit, end cover units
suitable for 415 volts 3 phase, 4 wire, 50 Hz A.C. System,
etc., Makes:- Legrand / L&T / Seimens /Schiender / GE make)

220 ELEC-2.8.37 Supply and Fixing of 400 Amps Horizontal / Vertical bends 1 No
Makes:- Legrand / L&T / Seimens / Schiender / GE make)

221 ELEC-2.8.38 Supply and Fixing of 400 Amps Copper Flexibles for three 1 No
phases and neutral Makes:- Legrand / L&T / Seimens /
Schiender / GE make)

222 ELEC-2.8.39 Supply and Fixing of 400 Amps Tap off box Makes:- 1 No
Legrand / L&T / Seimens / Schiender / GE make)

223 ELEC-2.8.40 Supply and Fixing of 250 Amps Tap off box Makes:- 1 No
Legrand / L&T / Seimens / Schiender / GE make)

224
2.9 MCBs (AS PER IS:8828)
225 ELEC-2.9.1 Supply of 6-32A 10KA SP MCB, C/D Curve ISI Mark of make 1 No
Legrand / Schneider.

226 ELEC-2.9.2 Supply of 40-63A 10KA SP MCB, C/D Curve ISI Mark of make 1 No
Legrand / Schneider.

227 ELEC-2.9.3 Supply of 6-32A 10KA DP MCB, C/D Curve ISI Mark of make 1 No
Legrand / Schneider.

228 ELEC-2.9.4 Supply of 40-63A 10KA DP MCB, C/D Curve ISI Mark of make 1 No
Legrand / Schneider.

229 ELEC-2.9.5 Supply of 6-32A 10KA TP MCB, C/D Curve ISI Mark of make 1 No
Legrand / Schneider.

230 ELEC-2.9.6 Supply of 40-63A 10KA TP MCB, C/D Curve ISI Mark of make 1 No
Legrand / Schneider.

231 ELEC-2.9.7 Supply of 6-32A 10KA FP MCB, C/D Curve ISI Mark of make 1 No
Legrand / Schneider.

232 ELEC-2.9.8 Supply of 40-63A FP MCB, C/D Curve ISI Mark of make 1 No
Legrand / Schneider.

233 ELEC-2.9.9 Supply of 6-32A 10KA SP MCB, C/D Curve ISI Mark of make 1 No
L&T Exora / Siemens / GE / ABB / Standard / Havells / HPL /
Indo Asian / Toyoma.
234 ELEC-2.9.10 Supply of 40-63A 10KA SP MCB, C/D Curve ISI Mark of make 1 No
L&T Exora / Siemens / GE / ABB / Standard / Havells / HPL /
Indo Asian / Toyoma.

235 ELEC-2.9.11 Supply of 6-32A 10KA DP MCB, C/D Curve ISI Mark of make 1 No
L&T Exora / Siemens / GE / ABB / Standard / Havells / HPL /
Indo Asian / Toyoma.

236 ELEC-2.9.12 Supply of 40-63A 10KA DP MCB, C/D Curve ISI Mark of make 1 No
L&T Exora / Hager / Siemens / GE / ABB / Standard / Havells
/ HPL / Indo Asian / Toyoma.

237 ELEC-2.9.13 Supply of 6-32A 10KA TP MCB, C/D Curve ISI Mark of make 1 No
L&T Exora / Hager / Siemens / GE / ABB / Standard /
Havells / HPL / Indo Asian / Toyoma.

238 ELEC-2.9.14 Supply of 40-63A 10KA TP MCB, C/D Curve ISI Mark of make 1 No
L&T Exora / Hager / Siemens / GE / ABB / Standard /
Havells / HPL / Indo Asian / Toyoma.

239 ELEC-2.9.15 Supply of 6-32A 10KA FP MCB, C/D Curve ISI Mark of make 1 No
L&T Exora / Hager / Siemens / GE / ABB / Standard /
Havells / HPL / Indo Asian / Toyoma.

240 ELEC-2.9.16 Supply of 40 - 63A 10KA FP MCB, C/D Curve ISI Mark of 1 No
make L&T Exora / Hager / Siemens / GE / ABB / Standard /
Havells / HPL / Indo Asian / Toyoma.

241 ELEC-2.9.17 Supply of 6-32A 10KA SP MCB, C/D Curve ISI Mark of make 1 No
Gold Medal / Milltec / Sputnik / Crystal / Bentec.

242 ELEC-2.9.18 Supply of 40-63A 10KA SP MCB, C/D Curve ISI Mark of make 1 No
Gold Medal / Milltec / Sputnik / Crystal / Bentec.

243 ELEC-2.9.19 Supply of 6-32A 10KA DP MCB, C/D Curve ISI Mark of make 1 No
Gold Medal / Milltec / Sputnik / Crystal / Bentec.

244 ELEC-2.9.20 Supply of 40-63A 10KA DP MCB, C/D Curve ISI Mark C- 1 No
Curve of make Gold Medal / Milltec / Sputnik / Crystal /
Bentec.

245 ELEC-2.9.21 Supply of 6-32A 10KA TP MCB, C/D Curve ISI Mark of make 1 No
Gold Medal / Milltec / Sputnik / Crystal / Bentec.

246 ELEC-2.9.22 Supply of 40 - 63A 10KA TP MCB, C/D Curve ISI Mark of 1 No
make Gold Medal / Milltec / Sputnik / Crystal / Bentec.

247 ELEC-2.9.23 Supply of 6-32A 10KA FP MCB, C/D Curve ISI Mark of make 1 No
Gold Medal / Milltec / Sputnik / Crystal / Bentec.
248 ELEC-2.9.24 Supply of 40 - 63A 10KA FP MCB, C/D Curve ISI Mark of 1 No
make Gold Medal / Milltec / Sputnik / Crystal / Bentec.

2.10 ISOLATORS
249 ELEC-2.10.1 Supply of 32A DP Isolator of make Legrand / Schneider. 1 No

250 ELEC-2.10.2 Supply of 40A DP Isolator of make Legrand / Schneider. 1 No

251 ELEC-2.10.3 Supply of 63A DP Isolator of make Legrand / Schneider. 1 No

252 ELEC-2.10.4 Supply of 40A TP Isolator of make Legrand / Schneider. 1 No

253 ELEC-2.10.5 Supply of 63A TP Isolator of make Legrand / Schneider. 1 No

254 ELEC-2.10.6 Supply of 40A FP Isolator of make Legrand / Schneider. 1 No

255 ELEC-2.10.7 Supply of 63A FP Isolator of make Legrand / Schneider. 1 No

256 ELEC-2.10.8 Supply of 100A FP Isolator of make Legrand / Schneider. 1 No

257 ELEC-2.10.9 Supply of 32A DP Isolator of make L&T Exora / Siemens / 1 No


GE / ABB / Standard / Havells / HPL / Indo Asian / Toyoma.
258 ELEC-2.10.10 Supply of 40A DP Isolator of make L&T Exora / Siemens / 1 No
GE / ABB / Standard / Havells / HPL / Indo Asian / Toyoma.

259 ELEC-2.10.11 Supply of 63A DP Isolator of make L&T Exora / Siemens / GE 1 No


/ ABB / Standard / Havells / HPL / Indo Asian / Toyoma.

260 ELEC-2.10.12 Supply of 40A TP Isolator of make L&T Exora / Siemens / 1 No


GE / ABB / Standard / Havells / HPL / Indo Asian / Toyoma.

261 ELEC-2.10.13 Supply of 63A TP Isolator of make L&T Exora / Siemens / GE 1 No


/ ABB / Standard / Havells / HPL / Indo Asian / Toyoma.

262 ELEC-2.10.14 Supply of 40A FP Isolator of make L&T Exora / Siemens / GE 1 No


/ ABB / Standard / Havells / HPL / Indo Asian / Toyoma.

263 ELEC-2.10.15 Supply of 63A FP Isolator of make L&T Exora / Siemens / GE 1 No


/ ABB / Standard / Havells / HPL / Indo Asian / Toyoma.

264 ELEC-2.10.16 Supply of 100A FP Isolator of make L&T Exora / Siemens / 1 No


GE / ABB / Standard / Havells / HPL / Indo Asian / Toyoma.

265 ELEC-2.10.17 Supply of 32A DP Isolator of make Gold Medal / Milltec / 1 No


Sputnik / Crystal / Bentec.

266 ELEC-2.10.18 Supply of 40A DP Isolator of make Gold Medal / Milltec / 1 No


Sputnik / Crystal / Bentec.

267 ELEC-2.10.19 Supply of 63A DP Isolator of make Gold Medal / Milltec / 1 No


Sputnik / Crystal / Bentec.

268 ELEC-2.10.20 Supply of 40A TP Isolator of make Gold Medal / Milltec / 1 No


Sputnik / Crystal / Bentec.
269 ELEC-2.10.21 Supply of 63A TP Isolator of make Gold Medal / Milltec / 1 No
Sputnik / Crystal / Bentec.

270 ELEC-2.10.22 Supply of 40A FP Isolator of make Gold Medal / Milltec / 1 No


Sputnik / Crystal / Bentec.

2.11 RCCBs CONFIRMS TO


IEC:61008 AND IS:12640
271 ELEC-2.11.1 Supply of 40A 2 Pole RCCB 30mA, of makes Legrand / 1 No
Schneider.

272 ELEC-2.11.2 Supply of 63A 2 Pole RCCB 30mA, of makes Legrand / 1 No


Schneider.

273 ELEC-2.11.3 Supply of 40A 2 Pole RCCB 100mA, of makes Legrand / 1 No


Schneider.

274 ELEC-2.11.4 Supply of 63A 2 Pole RCCB 100mA, of makes Legrand / 1 No


Schneider.

275 ELEC-2.11.5 Supply of 40A 4 Pole RCCB 30mA, of makes Legrand / 1 No


Schneider.

276 ELEC-2.11.6 Supply of 63A 4 Pole RCCB 30mA, of makes Legrand / 1 No


Schneider.

277 ELEC-2.11.7 Supply of 40A 4 Pole RCCB 100mA, of makes Legrand / 1 No


Schneider.

278 ELEC-2.11.8 Supply of 63A 4 Pole RCCB 100mA, of makes Legrand / 1 No


Schneider.

279 ELEC-2.11.9 Supply of 40A 2 Pole RCCB 30mA, of makes L&T Exora / 1 No
Siemens / GE / ABB / Standard / Havells / HPL / Indo Asian /
Toyoma.

280 ELEC-2.11.10 Supply of 63A 2 Pole RCCB 30mA, of makes L&T Exora / 1 No
Siemens / GE / ABB / Standard / Havells / HPL / Indo Asian /
Toyoma.

281 ELEC-2.11.11 Supply of 40A 2 Pole RCCB 100mA, of makes L&T Exora / 1 No
Siemens / GE / ABB / Standard / Havells / HPL / Indo Asian /
Toyoma.

282 ELEC-2.11.12 Supply of 63A 2 Pole RCCB 100mA, of makes L&T Exora / 1 No
Siemens / GE / ABB / Standard / Havells / HPL / Indo Asian /
Toyoma.

283 ELEC-2.11.13 Supply of 40A 4 Pole RCCB 30mA, of makes L&T Exora / 1 No
Siemens / GE / ABB / Standard / Havells / HPL / Indo Asian /
Toyoma.
284 ELEC-2.11.14 Supply of 40A 4 Pole RCCB 30mA, of makes L&T Exora / 1 No
Siemens / GE / ABB / Standard / Havells / HPL / Indo Asian /
Toyoma.

285 ELEC-2.11.15 Supply of 40A 4 Pole RCCB 100mA, of makes L&T Exora / 1 No
Siemens / GE / ABB / Standard / Havells / HPL / Indo Asian /
Toyoma.

286 ELEC-2.11.16 Supply of 63A 4 Pole RCCB 100mA, of makes L&T Exora / 1 No
Siemens / GE / ABB / Standard / Havells / HPL / Indo Asian /
Toyoma.

287 ELEC-2.11.17 Supply of MCB type Change Over Switch 20A Double Pole 2 1 No
way 400V AC suitable to fix on Din Channel of makes
Legrand / Schneider.

2.12 MCB DISTRIBUTION BOARDS


(AS PER IS:13032)
288 ELEC-2.12.1 Supply of 4 Way SPN DB with IP 20 Protection as per 1 No
IS:13032 and suitable for 4Nos S.P out goings and for 1 No
Incommer etc complete of makes Legrand / Schneider.

289 ELEC-2.12.2 Supply of 8 Way SPN DB with IP 20 Protection as per 1 No


IS:13032 and suitable for 8Nos S.P out goings and for 1 No
Incommer etc complete of makes Legrand / Schneider.

290 ELEC-2.12.3 Supply of 12 Way SPN DB with IP 20 Protection as per 1 No


IS:13032 and suitable for 12Nos S.P out goings and for 1 No
Incommer etc complete of makes Legrand / Schneider.

291 ELEC-2.12.4 Supply of 4 Way SPN DB with IP 43 Protection as per 1 No


IS:13032 and suitable for 4Nos S.P out goings and for 1 No
Incommer etc complete of makes Legrand / Schneider.

292 ELEC-2.12.5 Supply of 8 Way SPN DB with IP 43 Protection as per 1 No


IS:13032 and suitable for 8Nos S.P out goings and for 1 No
Incommer etc complete of makes Legrand / Schneider.

293 ELEC-2.12.6 Supply of 12 Way SPN DB with IP 43 Protection as per 1 No


IS:13032 and suitable for 12Nos S.P out goings and for 1 No
Incommer etc complete of makes Legrand / Schneider.

294 ELEC-2.12.7 Supply of 4 Way SPN DB with IP 20 Protection as per 1 No


IS:13032 and suitable for 4Nos S.P out goings and for 1 No
Incommer etc complete of makes L&T Exora / Siemens / GE
/ ABB / Standard / Havells / HPL / Indo Asian / Toyoma.
295 ELEC-2.12.8 Supply of 8 Way SPN DB with IP 20 Protection as per 1 No
IS:13032 and suitable for 8 Nos S.P out goings and for 1 No
Incommer etc complete of makes L&T Exora / Siemens / GE
/ ABB / Standard / Havells / HPL / Indo Asian / Toyoma.

296 ELEC-2.12.9 Supply of 12 Way SPN DB with IP 20 Protection as per 1 No


IS:13032 and suitable for 12 Nos S.P out goings and for 1 No
Incommer etc complete of makes L&T Exora / Siemens / GE
/ ABB / Standard / Havells / HPL / Indo Asian / Toyoma.

297 ELEC-2.12.10 Supply of 4 Way SPN DB with IP 43 Protection as per 1 No


IS:13032 and suitable for 4Nos S.P out goings and for 1
NoIncommer etc completeof makes L&T Exora / Siemens /
GE / ABB / Standard / Havells / HPL / Indo Asian / Toyoma.

298 ELEC-2.12.11 Supply of 8 Way SPN DB with IP 43 Protection as per 1 No


IS:13032 and suitable for 8 Nos S.P out goings and for 1 No
Incommer etc complete of makes L&T Exora / Siemens / GE
/ ABB / Standard / Havells / HPL / Indo Asian / Toyoma.

299 ELEC-2.12.12 Supply of 12 Way SPN DB with IP 43 Protection as per 1 No


IS:13032 and suitable for 12 Nos S.P out goings and for 1 No
Incommer etc complete of makes L&T Exora / Siemens / GE /
ABB / Standard / Havells / HPL / Indo Asian / Toyoma.

300 ELEC-2.12.13 Supply of 4 Way SPN DB with IP 20 Protection as per 1 No


IS:13032 and suitable for 4Nos S.P out goings and for 1 No
Incommer etc complete of makes Milltec / Sputnik / Crystal
/ Bentec.

301 ELEC-2.12.14 Supply of 8 Way SPN DB with IP 20 Protection as per 1 No


IS:13032 and suitable for 8 Nos S.P out goings and for 1 No
Incommer etc complete of makes Milltec / Sputnik / Crystal
/ Bentec.

302 ELEC-2.12.15 Supply of 12 Way SPN DB with IP 20 Protection as per 1 No


IS:13032 and suitable for 12 Nos S.P out goings and for 1 No
Incommer etc complete of makes Milltec / Sputnik / Crystal /
Bentec / Gold Medal.
303 ELEC-2.12.16 Supply of 4 Way SPN DB with IP 43 Protection as per 1 No
IS:13032 and suitable for 4Nos S.P out goings and for 1 No
Incommer etc complete of makes Milltec / Sputnik / Crystal
/ Bentec / Gold Medal.

304 ELEC-2.12.17 Supply of 8 Way SPN DB with IP 43 Protection as per 1 No


IS:13032 and suitable for 8 Nos S.P out goings and for 1 No
Incommer etc complete of makes Milltec / Sputnik / Crystal
/ Bentec / Gold Medal.

305 ELEC-2.12.18 Supply of 12 Way SPN DB with IP 43 Protection as per 1 No


IS:13032 and suitable for 12 Nos S.P out goings and for 1 No
Incommer etc complete of makes Milltec / Sputnik / Crystal /
Bentec / Gold Medal.

306 ELEC-2.12.19 Supply of 4 Way TPN DB Horizontal with IP 20 Protection as 1 No


per IS:13032 and suitable for 12 Nos S.P. out goings and for
1 No 4 pole Incommer etc complete of makes Legrand /
Schneider.

307 ELEC-2.12.20 Supply of 8 Way TPN DB Horizontal with IP 20 Protection as 1 No


per IS:13032 and suitable for 24 Nos S.P. out goings and for
1 No 4 pole Incommer etc complete of makes Legrand /
Schneider.

308 ELEC-2.12.21 Supply of 4 Way TPN DB Horizontal with IP 43 Protection as 1 No


per IS:13032 and suitable for 12 Nos S.P. out goings and for
1 No 4 pole Incommer etc complete of makes Legrand /
Schneider.

309 ELEC-2.12.22 Supply of 8 Way TPN DB Horizontal with IP 43 Protection as 1 No


per IS:13032 and suitable for 24 Nos S.P. out goings and for
1 No 4 pole Incommer etc complete of makes Legrand /
Schneider.

310 ELEC-2.12.23 Supply of 4 Way VTPN DB suitable for accommodating 4 pole 1 No


Isolator as incomer with IP 43 Protection as per IS:13032 and
suitable for 4Nos T.P. out goings etc complete of makes
Legrand / Schneider.

311 ELEC-2.12.24 Supply of 4 Way TPN DB suitable for accomodating 125A 4 1 No


Pole MCCB as incomer and 4 Nos TP MCBs as outgoing
and with IP 43 Protection of makes Legrand / Schneider.
312 ELEC-2.12.25 Supply of 8 Way TPN DB suitable for accomodating 125A 4 1 No
Pole MCCB as incomer and 8 Nos TP MCBs as outgoing and
with IP 43 Protection of makes Legrand / Schneider.

313 ELEC-2.12.26 Supply of 20A SP Plug and Socket in SS enclosure of makes 1 No


Legrand / Schneider.

314 ELEC-2.12.27 Supply of 20A TP Plug and Socket in SS enclosure of makes 1 No


Legrand / Schneider.

315 ELEC-2.12.28 Supply of 32A TP Plug and Socket in SS enclosure of makes 1 No


Legrand / Schneider.

316 ELEC-2.12.29 Supply of 4 Way TPN DB Horizontal with IP 20 Protection as 1 No


per IS:13032 and suitable for 12 Nos S.P. out goings and for
1 No 4 pole Incommer etc complete of makes L&T Exora /
Siemens / GE / ABB / Standard / Havells / HPL / Indo Asian /
Toyoma.

317 ELEC-2.12.30 Supply of 4 Way TPN DB Horizontal with IP 43 Protection as 1 No


per IS:13032 and suitable for 12 Nos S.P. out goings and for
1 No 4 pole Incommer etc complete of makes L&T Exora /
Siemens / GE / ABB / Standard / Havells / HPL / Indo Asian /
Toyoma.

318 ELEC-2.12.31 Supply of 8 Way TPN DB Horizontal with IP 43 Protection as 1 No


per IS:13032 and suitable for 24 Nos S.P. out goings and for
1 No 4 pole Incommer etc complete of makes L&T Exora /
Siemens / GE / ABB / Standard / Havells / HPL / Indo Asian /
Toyoma.

319 ELEC-2.12.32 Supply of 4 Way VTPN DB suitable for accommodating 4 1 No


pole Isolator as incomer with IP 43 Protection as per
IS:13032 and suitable for 4Nos T.P. out goings etc complete
of makes L&T Exora / Siemens / GE / ABB / Standard /
Havells / HPL / Indo Asian / Toyoma.

320 ELEC-2.12.33 Supply of 8 Way VTPN DB suitable for accommodating 4 1 No


pole Isolator as incomer with IP 43 Protection as per IS:13032
and suitable for 8 Nos T.P. out goings etc complete of makes
L&T Exora / Siemens / GE / ABB / Standard / Havells / HPL /
Indo Asian / Toyoma.

321 ELEC-2.12.34 Supply of 4 Way TPN DB Horizontal with IP 20 Protection as 1 No


per IS:13032 and suitable for 12Nos S.P. out goings and for
1 No 4 pole Incommer etc complete of makes Gold Medal /
Milltec / Sputnik / Crystal / Bentec.
322 ELEC-2.12.35 Supply of 4 Way TPN DB Horizontal with IP 43 Protection as 1 No
per IS:13032 and suitable for 12Nos S.P. out goings and for
1 No 4 pole Incommer etc complete of makes Gold Medal /
Milltec / Sputnik / Crystal / Bentec.

323 ELEC-2.12.36 Supply of 8 Way TPN DB Horizontal with IP 43 Protection as 1 No


per IS:13032 and suitable for 24Nos S.P. out goings and for
1 No 4 pole Incommer etc complete of makes Gold Medal /
Milltec / Sputnik / Crystal / Bentec.

324 ELEC-2.12.37 Supply of 4 Way VTPN DB suitable for accommodating 4 1 No


pole Isolator as incomer with IP 43 Protection as per IS:13032
and suitable for 4 Nos T.P. out goings etc complete of makes
Gold Medal / Milltec / Sputnik / Crystal / Bentec.

325 ELEC-2.12.38 Supply of 8 Way VTPN DB suitable for accommodating 4 1 No


pole Isolator as incomer with IP 43 Protection as per IS:13032
and suitable for 8 Nos T.P. out goings etc complete of makes
Gold Medal / Milltec / Sputnik / Crystal / Bentec.

326 ELEC-2.12.39 Supply of 20A SP Plug and Socket in SS enclosure of makes 1 No


Gold Medal / Milltec / Sputnik / Crystal / Bentec.

327 ELEC-2.12.40 Supply of 20A TP Plug and Socket in SS enclosure of makes 1 No


Gold Medal / Milltec / Sputnik / Crystal / Bentec.

328 ELEC-2.12.41 Supply of 32A TP Plug and Socket in SS enclosure of makes 1 No


Gold Medal / Milltec / Sputnik / Crystal / Bentec.

329 ELEC-2.12.42 Supply of SP Enclosure with IP 20 Protection of makes 1 No


Legrand / Schneider.

330 ELEC-2.12.43 Supply of DP/TP/FP Metal Enclosure with IP 20 Protection 1 No


of makes Legrand / Schneider.

331 ELEC-2.12.44 Supply of 20A SP Plug and Socket in SS enclosure of 1 No


Makes : Siemens / GE / ABB / GM / Havells / HPL / Hager /
Indo Asian (Gold Plus) / C&S / L&T / Honeywell sentry.

332 ELEC-2.12.45 Supply of 20A TP Plug and Socket in SS enclosure of 1 No


Makes : Siemens / GE / ABB / GM / Havells / HPL / Hager /
Indo Asian (Gold Plus) / C&S / L&T / Honeywell sentry.
333 ELEC-2.12.46 Supply of 32A TP Plug and Socket in SS enclosure of 1 No
Makes : Siemens / GE / ABB / GM / Havells / HPL / Hager /
Indo Asian (Gold Plus) / C&S / L&T / Honeywell sentry.

SECTION - 3
3.1 STREET LIGHT LUMINAIRES
331 ELEC-3.1.1 Supply of 1 x 36/40 W fluorescent street light luminaire with 1 No
sheet alluminium housing and UV stabilised acrylic cover
with all standard accessories etc of makes Wipro / G.E. /
Phillips / Bajaj / Crompton.

332 ELEC-3.1.2 Supply of 1 x 36/40 W fluorescent street light luminaire with 1 No


sheet alluminium housing and UV stabilised acrylic cover
with all standard accessories etc of makes Elton / RK / Style
Lamp / Mahita Electro / Capart / Akhil.

333 ELEC-3.1.3 Supply of 70W SV / MH Street light luminaire integral with 1 No


pressure diecast alluminium housing having pot optics with
IP66 protection with all standard accessories etc of makes
Wipro / G.E. / Phillips / Bajaj / Crompton.

334 ELEC-3.1.4 Supply of 70W SV / MH Street light luminaire integral with 1 No


pressure diecast alluminium housing having pot optics with
IP66 protection with all standard accessories etc of makes
Elton / RK / Style Lamp / Mahita Electro / Capart / Akhil.

335 ELEC-3.1.5 Supply of 150W SV / MH Street light luminaire integral with 1 No


pressure diecast alluminium housing having pot optics with
IP66 protection with all standard accessories etc of makes
Wipro / G.E. / Phillips / Bajaj / Crompton.

335 ELEC-3.1.6 Supply of 150W SV / MH Street light luminaire integral with 1 No


pressure diecast alluminium housing having pot optics with
IP66 protection with all standard accessories etc of makes
Elton / RK / Style Lamp / Mahita Electro / Capart / Akhil.

336 ELEC-3.1.7 Supply of 250W SV / MH Street light luminaire integral with 1 No


pressure diecast alluminium housing having pot optics with
IP66 protection with all standard accessories etc of makes
Wipro / G.E. / Phillips / Bajaj / Crompton.

337 ELEC-3.1.8 Supply of 250W SV / MH Street light luminaire integral with 1 No


pressure diecast alluminium housing having pot optics with
IP66 protection with all standard accessories etc of makes
Elton / RK / Style Lamp / Mahita Electro / Capart / Akhil.
338 ELEC-3.1.9 Supply of 400W MH Flood light luminaire with integral 1 No
weather proof diecast alluminium housing with IP66
protection with all standard accessories etc of makes Wipro /
G.E. / Phillips / Bajaj / Crompton/Surya/Venture/Halonix

339 ELEC-3.1.10 Supply of 400W MH Flood light luminaire with Non - 1 No


integral weather proof diecast alluminium housing with
IP66 protection with Control Gear Box without lamp of makes
Elton / RK / Style Lamp / Mahita Electro / Capart / Akhil.
340 ELEC-3.1.11 Supply of 2 x 400W MH Flood light luminaire with Non - 1 No
integral weather proof diecast alluminium housing with
IP66 protection with Control Gear Box without lamp of makes
Wipro / G.E. / Phillips / Bajaj / Crompton.

341 ELEC-3.1.12 Supply of 500W Hallozen Flood light luminaire with cast 1 No
alluminium housing and tough end glass cover with all
standard accessories of makes Elton / RK / Style Lamp /
Mahita Electro / Capart / Akhil.

342 ELEC-3.1.13 Supply of 1000W Hallozen Flood light luminaire with cast 1 No
alluminium housing and tough end glass cover with all
standard accessories of makes Elton / RK / Style Lamp /
Mahita Electro / Capart / Akhil.

343 ELEC-3.1.14 Supply of 1 x 26W CFL well glass, low bay luminaire with die 1 No
cast alluminium housing epoxy gray powder coated built in
Electronic ballast with gink plated wire guard and eye bolt of
make Wipro / GE / Phillips / Crompton / Bajaj.

3.2 POST TOP LANTERN LUMINAIRES


344 ELEC-3.2.1 Supply of 1 x 18W CFL integral post top luminaire with 1 No
conical shape, opal clear acrylic diffuser with cast alluminium
pole mounting capsule complete with all accessories and
ballast of makes Crompton / Bajaj / Surya / K Lite / HPL.

345 ELEC-3.2.2 Supply of 70W SV / MH integral HID lamp post top lantern 1 No
BJDPTI 70SV/ MH LPF or its equivalent with diamond /
Mushroom /Spherical diffuser etc complete with all
accessories of makes Wipro / Phillips / Bajaj / Crompton /
Surya / HPL.

ACCESSORIES FOR MV / SV / MH LUMINAIRES


3.3 COPPER BALLASTS
346 ELEC-3.3.1 Supply of 80W MV copper ballast of makes G.E. / Phillips / 1 No
Crompton / Bajaj / Surya / Havells.

347 ELEC-3.3.2 Supply of 80W MV copper ballast of makes RK / Style Lamp 1 No


/ Akhil / Capart.

348 ELEC-3.3.3 Supply of 125W MV copper ballast.of makes G.E. / Phillips / 1 No


Crompton / Bajaj / Surya / Havells.

349 ELEC-3.3.4 Supply of 125W MV copper ballast.of makes RK / Style 1 No


Lamp / Akhil / Capart.

350 ELEC-3.3.5 Supply of 70 W SV / MH copper ballast.of makes Wipro / G.E. 1 No


/ Phillips / Thorn.

351 ELEC-3.3.6 Supply of 70 W SV / MH copper ballast.of makes RK / Style 1 No


Lamp / Akhil / Capart.
352 ELEC-3.3.7 Supply of 150 W SV / MH copper ballast.of makes Wipro / 1 No
G.E. / Phillips / Thorn.

353 ELEC-3.3.8 Supply of 150 W SV / MH copper ballast.of makes RK / Style 1 No


Lamp / Akhil / Capart.

354 ELEC-3.3.9 Supply of 250 W SV / MH copper ballast.of makes Wipro / 1 No


G.E. / Phillips / Thorn.

355 ELEC-3.3.10 Supply of 250 W SV / MH copper ballast.of makes RK / Style 1 No


Lamp / Akhil / Capart.

356 ELEC-3.3.11 Supply of 400 W SV / MH copper ballast.of makes Wipro / 1 No


G.E. / Phillips / Thorn.

357 ELEC-3.3.12 Supply of 400 W SV / MH copper ballast.of makes RK / Style 1 No


Lamp / Akhil / Capart.

358 ELEC-3.3.13 Supply of Ignitor for SV / MH Lamp of makes Wipro / G.E. / 1 No


Phillips / Crompton / Bajaj / Surya / HPL / Havells / Venture.

359 ELEC-3.3.14 Supply of 4 mfd HPF Capacitor of makes Wipro / G.E. / 1 No


Phillips make

360 ELEC-3.3.15 Supply of 10 mfd HPF Capacitor of makes Wipro / G.E. / 1 No


Phillips make

361 ELEC-3.3.16 Supply of 15 mfd HPF Capacitor of makes Wipro / G.E. / 1 No


Phillips make

362 ELEC-3.3.17 Supply of 20 mfd HPF Capacitor of makes Wipro / G.E. / 1 No


Phillips make

363 ELEC-3.3.18 Supply of 33 mfd HPF Capacitor of makes Wipro / G.E. / 1 No


Phillips make

364 ELEC-3.3.19 Supply of 42 mfd HPF Capacitor of makes Wipro / G.E. / 1 No


Phillips make

ENEGRY SAVING ELECTRONIC BALLAST FOR STREET


LIGHT
365 ELEC-3.3.24 Supply of 70W SV / MH Electronic ballast having < 3W loss, 1 No
PF > 0.90, THD < 15% of makes Trinic / Fortune Art or its
equivalent.

366 ELEC-3.3.25 Supply of 150W SV / MH Electronic ballast having < 3W loss, 1 No


PF > 0.90, THD < 15% of makes Trinic / Fortune Art or its
equivalent.
367 ELEC-3.3.26 Supply of 250W SV / MH Electronic ballast having < 3W loss, 1 No
PF > 0.90, THD < 15% of makes Trinic / Fortune Art or its
equivalent.

BALLASTS FOR INDUCTION LAMPS


#REF! ELEC-3.3.28 Supply of 40W ballasts for Induction Lamp of Makes 1 No
Make:Crompton / Bajaj / Synergy Solutions / Fortune Art /
Billion Light

#REF! ELEC-3.3.29 Supply of 80W ballasts for Induction Lamp of Makes 1 No


Make:Crompton / Bajaj / Synergy Solutions / Fortune Art /
Billion Light

#REF! ELEC-3.3.30 Supply of 120W ballasts for Induction Lamp of Makes 1 No


Make:Crompton / Bajaj / Synergy Solutions / Fortune Art /
Billion Light

#REF! ELEC-3.3.31 Supply of 150W ballasts for Induction Lamp of Makes 1 No


Make:Crompton / Bajaj / Synergy Solutions / Fortune Art /
Billion Light

#REF! ELEC-3.3.32 Supply of 200W ballasts for Induction Lamp of Makes 1 No


Make:Crompton / Bajaj / Synergy Solutions / Fortune Art /
Billion Light

#REF! ELEC-3.3.33 Supply of 400W ballasts for Induction Lamp of Makes 1 No


Make:Crompton / Bajaj / Synergy Solutions / Fortune Art /
Billion Light

3.4 LAMPS
368 ELEC-3.4.1 Supply of 500W Hallozen Lamp with ISI mark of makes 1 No
Wipro / G.E. / Phillips / Osram/Crompton / Bajaj / Surya /
HPL / Havells.

369 ELEC-3.4.2 Supply of 500W Hallozen Lamp with ISI mark of makes Elton 1 No
/ Style Lamp / Mahita Electro / Capart

370 ELEC-3.4.3 Supply of 1000W Hallozen Lamp with ISI mark of makes 1 No
Wipro / G.E. / Phillips / Osram/Crompton / Bajaj / Surya /
HPL / Havells.

371 ELEC-3.4.4 Supply of 1000W Hallozen Lamp with ISI mark of makes 1 No
Elton / Style Lamp / Mahita Electro / Capart

372 ELEC-3.4.5 Supply of 70W SV Lamp with ISI mark of makes Wipro / 1 No
G.E. / Phillips / Osram/Crompton / Bajaj / Surya / HPL /
Havells.

373 ELEC-3.4.6 Supply of 70W SV Lamp with ISI mark of makes Elton / Style 1 No
Lamp / Mahita Electro / Capart
374 ELEC-3.4.7 Supply of 150W SV Lamp with ISI mark of makes Wipro / 1 No
G.E. / Phillips / Osram/Crompton / Bajaj / Surya / HPL /
Havells.

375 ELEC-3.4.8 Supply of 150W SV Lamp with ISI mark of makes Elton / 1 No
Style Lamp / Mahita Electro / Capart

376 ELEC-3.4.9 Supply of 250W SV Lamp with ISI mark of makesWipro / G.E. 1 No
/ Phillips / Osram/Crompton / Bajaj / Surya / HPL / Havells.

377 ELEC-3.4.10 Supply of 250W SV Lamp with ISI mark of makes Elton / Style 1 No
Lamp / Mahita Electro / Capart

378 ELEC-3.4.11 Supply of 400W SV Lamp with ISI mark of makesWipro / G.E. 1 No
/ Phillips / Osram/Crompton / Bajaj / Surya / HPL / Havells.

379 ELEC-3.4.12 Supply of 400W SV Lamp with ISI mark of makes Elton / 1 No
Style Lamp / Mahita Electro / Capart

380 ELEC-3.4.13 Supply of 70W double end MH Lamp with ISI mark of makes 1 No
Wipro / G.E. / Phillips / Osram/Crompton / Bajaj / Surya /
HPL / Havells.

381 ELEC-3.4.14 Supply of 70W double end MH Lamp with ISI mark of makes 1 No
Elton / Style Lamp / Mahita Electro / Capart

382 ELEC-3.4.15 Supply of 150W double end MH Lamp with ISI mark of 1 No
makes Wipro / G.E. / Phillips / Osram/Crompton / Bajaj /
Surya / HPL / Havells.

383 ELEC-3.4.16 Supply of 150W double end MH Lamp with ISI mark of 1 No
makes Elton / Style Lamp / Mahita Electro / Capart

384 ELEC-3.4.17 Supply of 70W MH Lamp with ISI mark of makes Crompton 1 No
/ Bajaj / Surya / HPL / Havells.

385 ELEC-3.4.18 Supply of 70W MH Lamp with ISI mark of makes Elton / 1 No
Style Lamp / Mahita Electro / Capart

386 ELEC-3.4.19 Supply of 150W MH Lamp with ISI mark of makes Wipro / 1 No
G.E. / Phillips / Osram/Crompton / Bajaj / Surya / HPL /
Havells.

387 ELEC-3.4.20 Supply of 150W MH Lamp with ISI mark of makes Elton / 1 No
Style Lamp / Mahita Electro / Capart

388 ELEC-3.4.21 Supply of 250W MH Lamp with ISI mark of makesWipro / G.E. 1 No
/ Phillips / Osram/Crompton / Bajaj / Surya / HPL / Havells.
389 ELEC-3.4.22 Supply of 250W MH Lamp with ISI mark of makes Elton / 1 No
Style Lamp / Mahita Electro / Capart

390 ELEC-3.4.23 Supply of 400W MH Lamp with ISI mark of makes Wipro / 1 No
G.E. / Phillips / Osram/Crompton / Bajaj / Surya / HPL /
Havells.

391 ELEC-3.4.24 Supply of 400W MH Lamp with ISI mark of makes Elton / 1 No
Style Lamp / Mahita Electro / Capart

3.5 AUTOMATIC STREET LIGHT CONTROL SYSTEM


392 ELEC-3.5.1 Supply of Automatic Street Light Control System with Optical 1 No
Sensor, Low volatage / High voltage trip and reset, operating
voltage 150 - 280V AC, 50 HZ with suitable SMC enclousure
of IP 54 protection, MCBs and contactor suitable to control the
load of 3 KW of single phase load with necessary clamping
arrangements. Makes : Swadeep Nature Switch / Light Mate.

393 ELEC-3.5.2 Supply of Automatic Street Light Control System with Optical 1 No
Sensor, Low volatage / High voltage trip and reset, operating
voltage 150 - 280V AC, 50 HZ with suitable SMC enclousure
of IP 54 protection, MCBs and contactor suitable to control the
load of 5 KW of single phase load with necessary clamping
arrangements. Makes : Swadeep Nature Switch / Light Mate.

394 ELEC-3.5.3 Supply of Automatic Street Light Control System with Optical 1 No
Sensor, Low volatage / High voltage trip and reset, operating
voltage 150 - 280V AC, 50 HZ with suitable SMC enclousure
of IP 54 protection, MCBs and contactor suitable to control the
load of 8 KW of single phase load with necessary clamping
arrangements. Makes : Swadeep Nature Switch / Light Mate.

395 ELEC-3.5.4 Supply of Automatic Street Light Control System with Optical 1 No
Sensor, Low volatage / High voltage trip and reset, operating
voltage 150 - 280V AC, 50 HZ with suitable SMC enclousure
of IP 54 protection, MCBs and contactor suitable to control the
load of 5 KW of Three phase load with necessary clamping
arrangements. Makes : Swadeep Nature Switch / Light Mate.

396 ELEC-3.5.5 Supply of Automatic Street Light Control System with Optical 1 No
Sensor, Low volatage / High voltage trip and reset, operating
voltage 150 - 280V AC, 50 HZ with suitable SMC enclousure
of IP 54 protection, MCBs and contactor suitable to control the
load of 8 KW of Three phase load with necessary clamping
arrangements. Makes : Swadeep Nature Switch / Light Mate.

397 ELEC-3.5.6 Supply of Automatic Street Light Control System with Optical 1 No
Sensor, Low volatage / High voltage trip and reset, operating
voltage 150 - 280V AC, 50 HZ with suitable SMC enclousure
of IP 54 protection, MCBs and contactor suitable to control the
load of 12 KW of Three phase load with necessary clamping
arrangements. Makes : Swadeep Nature Switch / Light Mate.

3.6 INTERNAL LUMINAIRES


398 ELEC-3.6.1 Supply of 1 x 11W Mirror light with all standard accessories 1 No
diffuser of makes G.E. / Phillips / Crompton / Bajaj.

399 ELEC-3.6.2 Supply of 1 x 11W Mirror light with all standard accessories 1 No
diffuser of makes Surya / Havells / HPL / Fortune Art

400 ELEC-3.6.3 Supply of 1 x 36/40W Box type tube light luminaire powder 1 No
coated CRCA sheet steel housing with Electronic Ballast
Chokes and all standard accessoriesof makes Wipro / G.E. /
Phillips / Crompton / Bajaj .

401 ELEC-3.6.4 Supply of 1 x 36/40W Box type tube light luminaire powder 1 No
coated CRCA sheet steel housing with Electronic Ballast
Chokes and all standard accessoriesof makes Surya /
Havells / HPL / Fortune Art

402 ELEC-3.6.5 Supply of 2 x 36/40W Box type tube light luminaire powder 1 No
coated CRCA sheet steel housing with Electronic Ballast
Chokes and all standard accessoriesof makes Wipro / G.E. /
Phillips / Crompton / Bajaj.

403 ELEC-3.6.6 Supply of 2 x 36/40W Box type tube light luminaire powder 1 No
coated CRCA sheet steel housing with Electronic Ballast
Chokes and all standard accessoriesof makes Surya /
Havells / HPL / Fortune Art

404 ELEC-3.6.7 Supply of 2 x 36/40W Surface /Recessed mounting mirror 1 No


optic luminaire with powder coated CRCA sheet steel housing
with alluminium mirror reflector and decorative end plates
with Electronic Ballast of makes Wipro/G.E./Phillips/Thorn /
Crompton.

405 ELEC-3.6.8 Supply of 2 x 36W CFL Paralite louvre (P5) Surface / 1 No


Recessed low glare Mirror Optic luminaire comprising bright
anodised alluminium reflector with Electronic Ballst of makes
Wipro / G.E. / Phillips / Crompton / Bajaj.

406 ELEC-3.6.9 Supply of 2 x 36W CFL Direct / Indirect Recessed low glare 1 No
Mirror Optic luminaire comprising bright anodised alluminium
reflector with Electronic Ballst of makes Wipro / G.E. /
Phillips / Thorn / Crompton / Bajaj.

407 ELEC-3.6.10 Supply of 1 x 18W CFL Direct / Indirect Recessed low glare 1 No
Mirror Optic luminaire comprising bright anodised alluminium
reflector with Electronic Ballst of makes Wipro / G.E. /
Phillips / Thorn / Crompton / Bajaj.

408 ELEC-3.6.11 Supply of 9/13W VPIT Ballast for CFL with ISI mark. Makes : 1 No
Phillips / Crompton / Bajaj / Surya / HPL / Havells
409 ELEC-3.6.12 Supply of 9/13W VPIT Ballast for CFL with ISI mark. Makes : 1 No
Fortune Art / Style Lamp / Mahita Electro / Capart
410 ELEC-3.6.13 Supply of 18W VPIT Ballast for CFL with ISI 1 No
mark.
Makes : Phillips / Crompton / Bajaj / Surya /
HPL / Havells
411 ELEC-3.6.14 Supply of 18W VPIT Ballast for CFL with ISI 1 No
mark.
Makes : Fortune Art / Style Lamp / Mahita
Electro / Capart
412 ELEC-3.6.15 Supply of 20W / 40W Copper Wound 1 No
Ballast.
Makes : Phillips / Crompton / Bajaj / Surya /
HPL / Havells
413 ELEC-3.6.16 Supply of 20W / 40W Copper Wound 1 No
Ballast.
Makes : Fortune Art / Style Lamp / Mahita
Electro / Capart
414 ELEC-3.6.17 Supply of 18/20W VPIT Ballast. 1 No
Makes : Phillips / Crompton / Bajaj / Surya /
HPL / Havells
415 ELEC-3.6.18 Supply of 18/20W VPIT Ballast. 1 No
Makes : Fortune Art / Style Lamp / Mahita
Electro / Capart
416 ELEC-3.6.19 Supply of 36/40W VPIT Ballast of makes 1 No
Phillips / Crompton / Bajaj / Surya.
Makes : Phillips / Crompton / Bajaj / Surya /
HPL / Havells
417 ELEC-3.6.20 Supply of 36/40W VPIT Ballast of makes 1 No
Phillips / Crompton / Bajaj / Surya.
Makes : Fortune Art / Style Lamp / Mahita
Electro / Capart
418 ELEC-3.6.21 Supply of 40W Starter of makes Phillips / 1 No
Crompton / Bajaj / Surya.
Makes : Phillips / Crompton / Bajaj / Surya / HPL / Havells
419 ELEC-3.6.22 Supply of 40W Starter of makes Phillips / 1 No
Crompton / Bajaj / Surya.
Makes : Phillips / Crompton / Bajaj / Surya / HPL / Havells
420 ELEC-3.6.23 Supply of Rotor holder(FTL). 1 No
Makes : Phillips / Crompton / Bajaj / Surya / HPL / Havells.

421 ELEC-3.6.24 Supply of Rotor holder(FTL). 1 No


Makes : Fortune Art / Style Lamp / Mahita Electro / Capart

422 ELEC-3.6.25 Supply of HID Lamp holder. 1 No


Makes : Phillips / Crompton / Bajaj / Surya / HPL / Havells
423 ELEC-3.6.26 Supply of HID Lamp holder. 1 No
Makes : Fortune Art / Style Lamp / Mahita Electro / Capart

424 ELEC-3.6.27 Supply of CFL holder of makes Phillips / 1 No


Crompton / Bajaj / Surya.
Makes : Phillips / Crompton / Bajaj / Surya / HPL / Havells.

425 ELEC-3.6.28 Supply of CFL holder of makes Phillips / 1 No


Crompton / Bajaj / Surya.
Makes : Fortune Art / Style Lamp / Mahita Electro / Capart

426 ELEC-3.6.29 Supply of FTL Starter holder. 1 No


Makes : Phillips / Crompton / Bajaj / Surya / HPL / Havells
427 ELEC-3.6.30 Supply of FTL Starter holder. 1 No
Makes : Fortune Art / Style Lamp / Mahita Electro / Capart

428 ELEC-3.6.31 Supply of 36W Electronic Ballast with total hormonic distortion 1 No
is less than 10% for FTL.
Makes : Phillips / Crompton / Bajaj / Surya / HPL / Havells
429 ELEC-3.6.32 Supply of 36W Electronic ballast with power factor greater 1 No
than 0.9 to 0.95 suitable for FTL. Make : Crompton Model
No.EBN 136D / Bajaj Model No.BJHF 136 / Havells LHBF
27904025 or its equivalent.

430 ELEC-3.6.33 Supply of 2 x 36/40W Industrial Box type tube light 1 No


luminaire powder coated CRCA sheet steel housing with
Electronic ballast and all standard accessories of makes
Crompton / Bajaj / Surya / HPL / Havells.

431 ELEC-3.6.34 Supply of 4 x 14W TL 5 high efficiency recessed luminaire, 1 No


epoxy powder coated CRCA sheet steel housing, low glare
with electronic ballast including cost of lamps etc., complete.
Makes: Phillips Model No.sereno-TBS 869 / Bajaj Model
No.BTMRA 414 CAT II / Crompton Model
No.CRTLU414EB/S.

432 ELEC-3.6.35 Supply of 1 x 28W surface pendent mounting T5 Luminaire 1 No


Box type with CRCA housing with Electronic Ballast and
all standard accessories of makes Phillips /Crompton /Bajaj
/ Surya / Havells.
433 ELEC-3.6.36 Supply of 1 x 28W surface pendent mounting T5 1 No
Luminaire plastic housing with integrated reflector
extruded alluminium luminaire with Electronic Ballast and all
standard accessories of makes Phlillips / Crompton / Bajaj /
Surya / Havells.
434 ELEC-3.6.37 Supply of Bulk head fitting with cast aluminium enamel 1 No
painted body with water tight, clear glass with wire guard
hinged with lock and key arrangements etc., complete.
Makes : Bajaj / Crompton / Surya
435 ELEC-3.6.38 Supply of single fancy bracket with glass shade best Indian 1 No
make
436 ELEC-3.6.39 Supply of double fancy bracket with glass shade best Indian 1 No
make
3.7 FLOURSCENT / CFL LAMPS
434 ELEC-3.7.1 Supply of 40W-60W Lamp. 1 No
Makes : Phillips / Crompton / Bajaj / Surya /
Style Lamp / Mahita Electro / Capart
435 ELEC-3.7.2 Supply of Night Lamp. 1 No
Makes : Phillips / Crompton / Bajaj / Surya /
Style Lamp / Mahita Electro / Capart.
436 ELEC-3.7.3 Supply of 18/20W fluorescent tube. 1 No
Makes : Phillips / Crompton / Bajaj / Surya.
437 ELEC-3.7.4 Supply of 36/40W fluorescent tube. 1 No
Makes : Phillips / Crompton / Bajaj / Surya.
438 ELEC-3.7.5 Supply of 36/40W fluorescent tube. 1 No
Makes : Fortune Art / Style lamp / Mahita
Electro / Capart
439 ELEC-3.7.6 Supply of 28W T5 fluorescent tube. 1 No
Makes : Crompton / Bajaj / Phillips / Surya /
Havells.
440 ELEC-3.7.7 Supply of 9W Pin type CFL Lamp. 1 No
Makes : Phillips / Crompton / Bajaj / Surya /
Havells / HPL / Halonix.
441 ELEC-3.7.8 Supply of 11W Pin type CFL Lamp. 1 No
Makes : Phillips / Crompton / Bajaj / Surya /
Havells / HPL / Halonix
442 ELEC-3.7.9 Supply of 13W Pin type CFL Lamp. 1 No
Makes : Phillips / Crompton / Bajaj / Surya /
Havells / HPL / Halonix
443 ELEC-3.7.10 Supply of 18W Pin type CFL Lamp. 1 No
Makes : Phillips / Crompton / Bajaj / Surya /
Havells / HPL / Halonix.
444 ELEC-3.7.11 Supply of 26W Pin type CFL Lamp. 1 No
Makes : Phillips / Crompton / Bajaj / Surya /
Havells / HPL / Halonix
445 ELEC-3.7.12 Supply of 36W Pin type CFL Lamp. 1 No
Makes : Phillips / Crompton / Bajaj / Surya /
Havells / HPL / Halonix
446 ELEC-3.7.13 Supply of up to 5W Retrofit tiny CFL. 1 No
Makes : Phillips / Crompton / Bajaj / Surya /
Havells / HPL / Halonix.
447 ELEC-3.7.14 Supply of up to 8W Retrofit tiny CFL. 1 No
Makes : Phillips / Crompton / Bajaj / Surya /
Havells / HPL / Halonix.
448 ELEC-3.7.15 Supply of up to 10/11W Retrofit tiny CFL. 1 No
Makes : Phillips / Crompton / Bajaj / Surya /
Havells / HPL / Halonix.
449 ELEC-3.7.16 Supply of up to 13/14W Retrofit tiny CFL. 1 No
Makes : Phillips / Crompton / Bajaj / Surya /
Havells / HPL / Halonix
450 ELEC-3.7.17 Supply of 15W Retrofit tiny CFL . 1 No
Makes : Phillips / Crompton / Bajaj / Surya /
Havells / HPL / Halonix
451 ELEC-3.7.18 Supply of up to 18/20W Retrofit CFL. 1 No
Makes : Phillips / Crompton / Bajaj / Surya /
Havells / HPL / Halonix.
452 ELEC-3.7.19 Supply of 23W Retrofit CFL. 1 No
Makes : Phillips / Crompton / Bajaj / Surya /
Havells / HPL / Halonix.
453 ELEC-3.7.20 Supply of up to 25/26W Retrofit CFL. 1 No
Makes : Phillips / Crompton / Bajaj / Surya /
Havells / HPL / Halonix
3.8 ENERGY CONSERVING FIXTURES
1 ELEC-3.8.1 Supply of 1 x 28W Box type powder coated energy 1 No
conserving tube light luminaire with Electronic ballast
operating voltage range of 90 volts to 350 volts power factor >
0.98 current less than 130ma crest factor and total hormonic
distortion shall be as per IS Specification with auto cut off at
high voltage suitable for 36/40W tube with 5 years guarantee
for luminaire.
Makes: Trinic or its equivalent.

2 ELEC-3.8.2 Supply of 28 W Electronic Ballast with less than 10% total 1 No


hormonic distortion and auto cut off at High Voltage suitable
for FTL with 5 years guarantee for luminaire.
Makes: Trinic or its equivalent.
3.9 LED LUMINAIRES INDOOR
ELEC-3.9.1 Supply and transportation of 3W LED Down Light Recessed /
Surface mounting with System Lumens ≥270lm, Housing
made of Powder coated Pressure die cast aluminum housing
with extended heat sink, with Protruded plastic Diffuser, IP20,
Inbuilt Electrical protections like Over/Under voltage, short
circuit, Over load, Open Circuit, Miswiring, LG7 standard
applicable, operating voltage range of 150 to 300 Volts AC,
P.F ≥ 0.9, Surge protection: 2KV, THD<15%, with high power
LED's having efficacy of ≥ 110 lumens/watt,CCT: 3000K /
4000K / 5600K ±300K, CRI≥80...Manufacture has to submit
LM79, LM80 & Photobiological Safety Report. Luminaire
Performance Complies to IS10322 (Part 5/Sec 3) & IEC
60598-1,IEC 60529 and & ISO certified company.
LUMINAIRE MAKE : Phillips / OSRAM / GE / Crompton /
VIN / Bajaj / Havells / Halonix / HPL.
LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM
/ SAMSUNG / LG LEDs

ELEC-3.9.2 Supply and Transportation of 3W Down lighter with system


lumens of 240lm, suitable for Recessed / Surface mounting
made of Pressure die cast aluminum body with powder
coating, acrylic diffuser with Driver, operating voltage range of
150 to 265 Volts AC, P.F ≥ 0.9, Surge protection:
2KV,THD<15%, with high power LED's having efficacy of ≥
100 umins/watt,CCT: 3000K - 5700K, minimum CRI≥70, .etc.,
completea) LUMINAIRE MAKE : Pharox / Surya /
Syska / Muelux / Fortune Art / Capart / Green Lites / Kashyap
BLU / R-LED / GM / Million.
LED MAKE : PHILIPS LUMILEDS / CREE /
NICHIA / OSRAM / SAMSUNG / LG LEDs

ELEC-3.9.3 Supply and Transportation of 3W Down lighter with system 1 No


lumens of 240lm, suitable for Recessed / Surface mounting
made of Pressure die cast aluminum body with powder
coating, acrylic diffuser with Driver, operating voltage range of
150 to 265 Volts AC, P.F ≥ 0.9, Surge protection:
2KV,THD<15%, with high power LED's having efficacy of ≥ 90
lumens/watt,CCT: 3000K - 5700K, minimum CRI≥70, .etc.,
complete.
LUMINAIRE MAKE : Trinic / Avni
/ Kripa Lights / Stanjo / Cosmo / VRILISO /
Pro-Lite / Godwyn / Scintilla / JSTC Solar.
LED MAKE : PHILIPS LUMILEDS / CREE /
NICHIA / OSRAM / SAMSUNG / LG LEDs.
#REF! ELEC-3.9.4 Supply and transportation of 6W LED Down 1 No
Light Recessed / Surface mounting with
System Lumens≥510lm, Housing made of
Powder coated Pressure die cast aluminum
housing with extended heat sink, with
Protruded plastic Diffuser, IP20, Inbuilt
Electrical protections like Over/Under
voltage, short circuit, Over load, Open
Circuit, Miswiring, LG7 standard applicable,
operating voltage range of 150 to 270 Volts
AC, P.F ≥ 0.9, Surge protection: 2KV,
THD<10%, with high power LED's having
efficacy of ≥ 110 lumens/watt,CCT:
3000K/4000K/5600K ±300K,
CRI≥80...Manufacture has to submit
LM79,LM80 & Photobiological Safety
Report. Luminaire Performance Complies
to IS10322 (Part 5/Sec 3) & IEC 60598-
1,IEC 60529 & ISO certified
company.LUMINAIRE MAKE : Phillips /
OSRAM / GE / Crompton / VIN / Bajaj /
Havells / Halonix / HPL.LED MAKE :
PHILIPS LUMILEDS / CREE / NICHIA /
OSRAM / SAMSUNG / LG LEDs.

#REF! ELEC-3.9.5 Supply and transportation of 6W LED slim 1 No


panel Light Round / Square with System
Lumens≥510lm, Housing made of Powder
coated die cast aluminum housing with
extended heat sink, with Protruded plastic
Diffuser, IP20, Inbuilt Electrical protections
like Over/Under voltage, short circuit, Over
load, Open Circuit, Miswiring, LG7 standard
applicable, operating voltage range of 150
to 265 Volts AC, P.F ≥ 0.9, Surge
protection: 2KV, THD<10%, with high
power LED's having efficacy of ≥ 100
lumens/watt, CCT: 3000K/4000K/5600K
±300K, CRI≥70. Manufacture has to submit
LM79,LM80 & Photobiological Safety
Report. Luminaire Performance Complies
to IS10322 (Part 5/Sec 3) & IEC 60598-
1,IEC 60529 ISO certified company.
LUMINAIRE MAKE : Pharox / Surya /
Syska / Muelux / Fortune Art / Capart /
Green Lites / Kashyap BLU / R-LED / GM /
Million.
LED MAKE : PHILIPS LUMILEDS / CREE /
NICHIA / OSRAM / SAMSUNG / LG LEDs
#REF! ELEC-3.9.6 Supply and Transportation of 6W Down 1 No
lighter with system lumens of 480lm,
suitable for Recessed / Surface mounting
made of pressure die cast aluminum body
with powder coating, acrylic diffuser with
Driver, operating voltage range of 150 to
270 Volts AC, P.F ≥ 0.9, Surge protection:
2KV, with high power LED's having
efficacy of ≥ 90 lumens/watt,CCT: 3000K -
5700K, minimum CRI≥70, .etc., complete.
LUMINAIRE MAKE : Trinic / Avni
/ Kripa Lights / Stanjo / Cosmo / VRILISO /
Pro-Lite / Godwyn / Scintilla / JSTC Solar.
LED MAKE : PHILIPS LUMILEDS / CREE /
NICHIA / OSRAM / SAMSUNG / LG LEDs

#REF! ELEC-3.9.7 Supply and Transportation of 6W Down 1 No


lighter with system lumens of 480lm,
suitable for Recessed / Surface mounting
made pressure die cast aluminum body
with powder coating, acrylic diffuser with
Driver,operating voltage range of 150 to
265 Volts AC, P.F ≥ 0.9, Surge protection:
2KV, with high power LED's having
efficacy of ≥ 90 lumens/watt, CCT: 3000K -
5700K, minimum CRI≥70, .etc.,
complete.LUMINAIRE MAKE : Procorp
/ Scintilla / R-LED / ilite LED MAKE :
PHILIPS LUMILEDS / CREE / NICHIA /
OSRAM / SAMSUNG.

#REF! ELEC-3.9.8 Supply and transportation of 12W LED


Down Light Recessed / Surface mounting
with System Lumens≥1000lm, Housing
made of Powder coated Pressure die cast
aluminum housing with extended heat sink,
with Protruded plastic Diffuser, IP20, Inbuilt
Electrical protections like Over/Under
voltage, short circuit, Over load, Open
Circuit, Miswiring, LG7 standard applicable,
operating voltage range of 150 to 265 Volts
AC, P.F ≥ 0.9, Surge protection: 2KV,
THD<10%, with high power LED's having
efficacy of ≥ 110 lumens/watt,CCT:
3000K/4000K/5600K ±300K,
CRI≥80...Manufacture has to submit
LM79,LM80 & Photobiological Safety
Report. Luminaire Performance Complies
to IS10322 (Part 5/Sec 3) & IEC 60598-1,
IEC 60529 & ISO certified company.
LUMINAIRE MAKE : Phillips / OSRAM / GE
/ Crompton / VIN / Bajaj / Havells / Halonix
/ HPL.
LED MAKE : PHILIPS LUMILEDS / CREE /NICHIA /
OSRAM / SAMSUNG / LG LEDs
#REF! ELEC-3.9.9 Supply and Transportation of 12W Down
lighter with system lumens of 1000lm,
suitable for Recessed / Surface
mounting made of pressure die cast
aluminum body with powder coating, acrylic
diffuser with Driver, operating voltage range
of 150 to 265 Volts AC, P.F ≥ 0.9, Surge
protection: 2KV, THD<15%, with high
power LED's having efficacy of ≥ 100
lumens/watt,CCT: 3000K - 5700K,
minimum CRI≥70,.etc., complete with
3 years warranty.
LUMINAIRE MAKE : Pharox / Surya /
Syska / Muelux / Fortune Art / Capart /
Green Lites / Kashyap BLU / R-LED / GM /
Million.
LED MAKE : PHILIPS LUMILEDS / CREE /
NICHIA / OSRAM / SAMSUNG / LG LEDs.

#REF! ELEC-3.9.10 Supply and Transportation of 12W Down 1 No


lighter with system lumens of 1000lm,
suitable for Recessed / Surface
mounting made of pressure die cast
aluminum body with powder coating, acrylic
diffuser with Driver, operating voltage range
of 150 to 265 Volts AC, P.F ≥ 0.9, Surge
protection: 2KV, THD<15%, with high
power LED's having efficacy of ≥ 90
lumens/watt,CCT: 3000K - 5700K,
minimum CRI≥70,.etc., complete with
3 years warranty.LUMINAIRE MAKE :
Trinic / Avni / Krips Lights / Stanjo / Cosmo
/ VRILISO / Pro-Lite / Goldwyn / Scintilla /
JSTC Solar.LED MAKE : PHILIPS
LUMILEDS / CREE / NICHIA / OSRAM /
SAMSUNG / LG LEDs

#REF! ELEC-3.9.11 Supply and transportation of 12W LED 1 No


slimline panel light with System
Lumens≥1000lm, Housing made of Powder
coated, round / Square with Protruded
plastic Diffuser, IP20, Inbuilt Electrical
protections like Over/Under voltage, short
circuit, Over load, Open Circuit, Miswiring,
LG7 standard applicable, operating voltage
range of 150 to 265 Volts AC, P.F ≥ 0.9,
Surge protection: 2KV, THD<10%, with
high power LED's having efficacy of ≥ 110
lumens/watt,CCT: 3000K/4000K/5600K
±300K, CRI≥80...Manufacture has to submit
LM79,LM80 & Photobiological Safety
Report. Luminaire Performance Complies
to IS10322 (Part 5/Sec 3) & IEC 60598-
1,IEC 60529 & ISO certified company.
LUMINAIRE MAKE : Phillips / OSRAM / GE
/ Crompton / VIN / Bajaj / Havells / Halonix
/ HPL.
LED MAKE : PHILIPS LUMILEDS / CREE /
NICHIA / OSRAM / SAMSUNG / LG LEDs
#REF! ELEC-3.9.12 Supply and transportation of 12W LED
slimline panel Light with System
Lumens≥1000lm, Housing made of Powder
coated, round / Square with Protruded
plastic Diffuser, IP20, Inbuilt Electrical
protections like Over/Under voltage, short
circuit, Over load, Open Circuit, Miswiring,
LG7 standard applicable, operating voltage
range of 150 to 265 Volts AC, P.F ≥ 0.9,
Surge protection: 2KV, THD<10%, with
high power LED's having efficacy of ≥ 100
lumens/watt,CCT: 3000K/4000K/5600K
±300K, CRI≥70...Manufacture has to submit
LM79,LM80 & Photobiological Safety
Report. Luminaire Performance Complies
to IS10322 (Part 5/Sec 3) & IEC 60598-
1,IEC 60529 & ISO certified company.
LUMINAIRE MAKE : Pharox / Surya /
Syska / Muelux / Fortune Art / Capart /
Green Lites / Kashyap BLU / R-LED / GM /
Million.
LED MAKE : PHILIPS LUMILEDS / CREE /
NICHIA / OSRAM / SAMSUNG / LG LEDs.

#REF! ELEC-3.9.13 Supply and transportation of 12W LED


slimline panel Light with System
Lumens≥1000lm, Housing made of Powder
coated, round / Square with Protruded
plastic Diffuser, IP20, Inbuilt Electrical
protections like Over/Under voltage, short
circuit, Over load, Open Circuit, Miswiring,
LG7 standard applicable, operating voltage
range of 150 to 265 Volts AC, P.F ≥ 0.9,
Surge protection: 2KV, THD<10%, with
high power LED's having efficacy of ≥ 90
lumens/watt,CCT: 3000K/4000K/5600K
±300K, CRI≥70...Manufacture has to submit
LM79,LM80 & Photobiological Safety
Report. Luminaire Performance Complies
to IS10322 (Part 5/Sec 3) & IEC 60598-
1,IEC 60529 & ISO certified
company.LUMINAIRE MAKE : Trinic /
Avni / Krips Lights / Stanjo / Cosmo /
VRILISO / Pro-Lite / Goldwyn / Scintilla /
JSTC Solar.LED MAKE : PHILIPS
LUMILEDS / CREE / NICHIA / OSRAM /
SAMSUNG / LG LEDs.
#REF! ELEC-3.9.14 Supply and transportation of 18W LED
Down Light Recessed / Surface mounting
with System Lumens≥1540lm, Housing
made of Powder coated Pressure die cast
aluminum housing with extended heat sink,
with Protruded plastic Diffuser, IP20, Inbuilt
Electrical protections like Over/Under
voltage, short circuit, Over load, Open
Circuit, Miswiring, LG7 standard applicable,
operating voltage range of 150 to 265 Volts
AC, P.F ≥ 0.9, Surge protection: 2KV,
THD<10%, with high power LED's having
efficacy of ≥ 110 lumens/watt,CCT:
3000K/4000K/5600K ±300K,
CRI≥80...Manufacture has to submit
LM79,LM80 & Photobiological Safety
Report. Luminaire Performance Complies
to IS10322 (Part 5/Sec 3) & IEC 60598-
1,IEC 60529 & ISO certified company.
LUMINAIRE MAKE : Phillips / OSRAM / GE
/ Crompton / VIN / Bajaj / Havells / Halonix
/ HPL.
LED MAKE : PHILIPS LUMILEDS / CREE /
NICHIA / OSRAM / SAMSUNG / LG LEDs.

#REF! ELEC-3.9.15 Supply and transportation of 18W LED


Down Light Recessed / Surface mounting
with System Lumens≥1500 lm, Housing
made of Powder coated Pressure die cast
aluminum housing with extended heat sink,
with Protruded plastic Diffuser, IP20, Inbuilt
Electrical protections like Over/Under
voltage, short circuit, Over load, Open
Circuit, Miswiring, LG7 standard applicable,
operating voltage range of 150 to 265 Volts
AC, P.F ≥ 0.9, Surge protection: 2KV,
THD<10%, with high power LED's having
efficacy of ≥ 100 lumens/watt,CCT:
3000K/4000K/5600K ±300K,
CRI≥70...Manufacture has to submit LM79,
LM80 & Photobiological Safety Report.
Luminaire Performance Complies to
IS10322 (Part 5/Sec 3) & IEC 60598-1,IEC
60529 & ISO certified
company.LUMINAIRE MAKE : Pharox /
Surya / Syska / Muelux / Fortune Art /
Capart / Green Lites / Kashyap BLU / RLED
/ GM / Million. LED MAKE : PHILIPS
LUMILEDS / CREE / NICHIA / OSRAM /
SAMSUNG / LG LEDs.
#REF! ELEC-3.9.16 Supply and transportation of 18W LED
Down Light Recessed / Surface mounting
with System Lumens≥1540lm, Housing
made of Powder coated Pressure die cast
aluminum housing with extended heat sink,
with Protruded plastic Diffuser, IP20, Inbuilt
Electrical protections like Over/Under
voltage, short circuit, Over load, Open
Circuit, Miswiring, LG7 standard applicable,
operating voltage range of 150 to 265 Volts
AC, P.F ≥ 0.9, Surge protection: 2KV,
THD<10%, with high power LED's having
efficacy of ≥ 90 lumens/watt,CCT:
3000K/4000K/5600K ±300K,
CRI≥70...Manufacture has to submit
LM79,LM80 & Photobiological Safety
Report. Luminaire Performance Complies
to IS10322 (Part 5/Sec 3) & IEC 60598-
1,IEC 60529 & ISO certified company.
LUMINAIRE MAKE : Trinic / Avni / Krips
Lights / Stanjo / Cosmo / VRILISO / Pro-Lite
/ Goldwyn / Scintilla / JSTC Solar.
LED MAKE : PHILIPS LUMILEDS / CREE /
NICHIA / OSRAM / SAMSUNG / LG LEDs

#REF! ELEC-3.9.17 Supply and transportation of 18W LED slim


panel Light with System Lumens≥1540lm,
Housing made of Powder coated aluminum
housing with extended heat sink, Round /
Square with Protruded plastic Diffuser,
IP20, Inbuilt Electrical protections like
Over/Under voltage, short circuit, Over
load, Open Circuit, Miswiring, LG7 standard
applicable, operating voltage range of 150
to 265 Volts AC, P.F ≥ 0.9, Surge
protection: 2KV, THD<10%, with high
power LED's having efficacy of ≥ 110
lumens/watt,CCT: 3000K/4000K/5600K
±300K, CRI≥80...Manufacture has to submit
LM79, LM80 & Photobiological Safety
Report. Luminaire Performance Complies
to IS10322 (Part 5/Sec 3) & IEC 60598-
1,IEC 60529 & ISO certified
company.LUMINAIRE MAKE : Phillips /
OSRAM / GE / Crompton / VIN / Bajaj /
Havells / Halonix / HPL.
LED MAKE : PHILIPS LUMILEDS / CREE /
NICHIA / OSRAM / SAMSUNG / LG LEDs
#REF! ELEC-3.9.18 Supply and transportation of 18W LED slim
panel Light with System Lumens≥1500lm,
Housing made of Powder coated aluminum
housing with extended heat sink, Round /
Square with Protruded plastic Diffuser,
IP20, Inbuilt Electrical protections like
Over/Under voltage, short circuit, Over
load, Open Circuit, Miswiring, LG7 standard
applicable, operating voltage range of 150
to 265 Volts AC, P.F ≥ 0.9, Surge
protection: 2KV, THD<10%, with high
power LED's having efficacy of ≥ 100
lumens/watt,CCT: 3000K/4000K/5600K
±300K, CRI≥70...Manufacture has to submit
LM79, LM80 & Photobiological Safety
Report. Luminaire Performance Complies
to IS10322 (Part 5/Sec 3) & IEC 60598-
1,IEC 60529 & ISO certified company.
LUMINAIRE MAKE : Pharox / Surya /
Syska / Muelux / Fortune Art / Capart /
Green Lites / Kashyap BLU / R-LED / GM /
Million.
LED MAKE : PHILIPS LUMILEDS / CREE /
NICHIA / OSRAM / SAMSUNG / LG LEDs.

#REF! ELEC-3.9.19 Supply and transportation of 18W LED slim 1 No


panel Light with System Lumens≥1500lm,
Housing made of Powder coated aluminum
housing with extended heat sink, Round /
Square with Protruded plastic Diffuser,
IP20, Inbuilt Electrical protections like
Over/Under voltage, short circuit, Over
load, Open Circuit, Miswiring, LG7 standard
applicable, operating voltage range of 150
to 265 Volts AC, P.F ≥ 0.9, Surge
protection: 2KV, THD<10%, with high
power LED's having efficacy of ≥ 90
lumens/watt,CCT: 3000K/4000K/5600K
±300K, CRI≥70...Manufacture has to submit
LM79, LM80 & Photobiological Safety
Report. Luminaire Performance Complies
to IS10322 (Part 5/Sec 3) & IEC 60598-
1,IEC 60529 & ISO certified
company.LUMINAIRE MAKE : Trinic /
Avni / Krips Lights / Stanjo / Cosmo /
VRILISO / Pro-Lite / Goldwyn / Scintilla /
JSTC Solar.LED MAKE : PHILIPS
LUMILEDS / CREE / NICHIA / OSRAM /
SAMSUNG / LG LEDs.
#REF! ELEC-3.9.20 Supply and transportation of 20W, 1 No
2000 lumens, T8,1200mm length LED
tube light, input voltage AC 220 - 260Volts
with PF≥0.9, Surge protection:
2KV,THD<10%, with inbuilt driver and
frosted cover CCT: 3000K - 5700K,
minimum CRI≥80,.etc., complete
Manufacture has to submit LM79,LM80 &
Photobiological Safety Report. Luminaire
Performance Complies to IS10322 (Part
5/Sec 3) & IEC 60598-1,IEC 60529 ISO
certified company.
LUMINAIRE MAKE: Phillips / OSRAM / GE
/ Crompton / VIN / Bajaj / Havells / Halonix
/ HPL.
LED MAKE : PHILIPS LUMILEDS / CREE /
NICHIA / OSRAM / SAMSUNG / LG LEDs

#REF! ELEC-3.9.21 Supply and transportation of 20W, 1 No


2000 lumens, T8,1200mm length LED
tube light, input voltage AC 220 - 260 Volts
with PF≥0.9, Surge protection:
2KV,THD<15%, with inbuilt driver and
frosted cover CCT: 3000K - 5700K,
minimum CRI≥70,.etc.,complete.
LUMINAIRE MAKE: Pharox / Surya /
Syska / Muelux / Fortune Art / Capart /
Green lites / Kashyap BLU / R-LED / GM /
Million.LED MAKE : PHILIPS LUMILEDS / CREE /
NICHIA / OSRAM / SAMSUNG / LG LEDs.

ELEC-3.9.22 Supply and transportation of 20W, 1 No


2000 lumens, T8,1200mm length LED
tube light, input voltage AC 220 - 260 Volts
with PF≥0.9, Surge protection:
2KV,THD<15%, with inbuilt driver and
frosted cover CCT: 3000K - 5700K,
minimum
CRI≥70,.etc.,complete.LUMINAIRE MAKE :
Avni / Stanjo / Cosmo / VRILISO / JSTC
Solar.LED MAKE : PHILIPS LUMILEDS /
CREE / NICHIA / OSRAM / SAMSUNG /
LG LEDs

ELEC-3.9.23 Supply and transportation of 1 No


18W/20W, 1700 lumens, 1200mm
length T5 LED light, input voltage AC 165 -
260 Volts with PF≥0.9, Surge protection:
2KV,THD<10%, with inbuilt driver and
frosted cover CCT: 3000K - 5700K,
minimum CRI≥80, Manufacture has to
submit LM79,LM80 & Photobiological
Safety Report. Luminaire Performance
Complies to IS10322 (Part 5/Sec 3) & IEC
60598-1,IEC 60529 & ISO certified
company. .etc., complete.
LUMINAIRE MAKE: Phillips / OSRAM / GE
/ Crompton / VIN / Bajaj / Havells / Halonix /
HPL.
LED MAKE : PHILIPS LUMILEDS / CREE /
NICHIA / OSRAM / SAMSUNG / LG LEDs
ELEC-3.9.24 Supply and transportation of 1 No
18W/20W, 1700 lumens, 1200mm
length T5 LED light, input voltage AC 165 -
260 Volts with PF≥0.9, Surge protection:
2KV,THD<10%, with inbuilt driver and
frosted cover CCT: 3000K - 5700K,
minimum CRI≥70, Manufacture has to
submit LM79,LM80 & Photobiological
Safety Report. Luminaire Performance
Complies to IS10322 (Part 5/Sec 3) & IEC
60598-1,IEC 60529 & ISO certified
company. .etc., complete.
LUMINAIRE MAKE: Pharox / Surya /
Syska / Muelux / Fortune Art / Capart /
Green lites / Kashyap BLU / R-LED / GM /
Million.
LED MAKE : PHILIPS LUMILEDS / CREE /
NICHIA / OSRAM / SAMSUNG / LG LEDs

ELEC-3.9.25 Supply and transportation of 1 No


18W/20W, 1700 lumens, 1200mm
length T5 LED light, input voltage AC 165 -
260 Volts with PF≥0.9, Surge protection:
2KV,THD<10%, with inbuilt driver and
frosted cover CCT: 3000K - 5700K,
minimum CRI≥70, Manufacture has to
submit LM79,LM80 & Photobiological
Safety Report. Luminaire Performance
Complies to IS10322 (Part 5/Sec 3) & IEC
60598-1,IEC 60529 & ISO certified
company. .etc., complete.
LUMINAIRE MAKE: Trinic / Avni / Kripa
Lights / Stanjo / Cosmo / VRILISO / Pro-Lite
/ Goldwyn / Scintilla / JSTC Solar.
LED MAKE : PHILIPS LUMILEDS / CREE /
NICHIA / OSRAM / SAMSUNG / LG LEDs

ELEC-3.9.26 Supply and Transportation of 36W , 2' x 2' 1 No


(600mm x 600mm) slim panel LED
luminaire Round / Square with System
Lumens of ≥3000, Housing Made of
Aluminum alloy with corrosion resistant
powder coat, with Diffuser , operating
voltage range of 100 to 270 Volts AC, P.F ≥
0.95, Surge protection: 2KV, THD<10%,
Inbuilt Electrical protections like Over/Under
voltage, short circuit, Over load, Open
Circuit, Miswiring with high power LED's
having efficacy of ≥ 110 lumens/watt,CCT:
3000K - 5700K, minimum CRI≥80,
Manufacture has to submit LM79,LM80 &
Photobiological Safety Report. Luminaire
Performance Complies to IS10322 (Part
5/Sec 3) & IEC 60598-1,IEC 60529 and
Manufacture should be ISO certified
company.LUMINAIRE MAKE : Phillips /
OSRAM / GE / Crompton / Bajaj / Havells /
Halonix / HPL.LED MAKE : PHILIPS
LUMILEDS / CREE / NICHIA / OSRAM /
SAMSUNG / LG LEDs.
ELEC-3.9.27 Supply and Transportation of 36W, 2' x2' 1 No
(600mm x 600mm) slim panel LED
luminaire Round / Square Housing Made of
Aluminum alloy with corrosion resistant
powder coat, with acrylic diffuser, Constant
current out put of Driver operating voltage
range of 150 to 265 Volts AC, Power factor
≥ 0.9 high power LEDs having efficacy of ≥
100 lumens/watt, junction temperature less
than 85 degrees centigrade and THD is
less than 12% etc., complete.
LUMINAIRE MAKE: Pharox / Surya /Syska / Muelux / Fortune
Art / Capart /
Green lites / Kashyap BLU / R-LED / GM /
Million.
LED MAKE : PHILIPS LUMILEDS / CREE /
NICHIA / OSRAM / SAMSUNG / LG LEDs

ELEC-3.9.28 Supply and Transportation of 36W 2' x2' 1 No


(600mm x 600mm) Slim panel LED
luminaire Round / Square Housing Made of
Aluminum alloy with corrosion resistant
powder coat, with acrylic diffuser, Constant
current out put of Driver operatingvoltage
range of 150 to 265 Volts AC, Power factor
≥ 0.9 high power LEDs having efficacy of ≥
90 lumens/watt, junction temperature less
than 85 degrees centigrade and THD is
less than 12% etc., complete.
LUMINAIRE MAKE : Trinic / Avni / Kripa
Lights / Stanjo / Cosmo / VRILISO / Pro-Lite
/ Goldwyn / Scintilla / JSTC Solar.
LED MAKE : PHILIPS LUMILEDS / CREE /
NICHIA / OSRAM / SAMSUNG / LG LEDs

#REF! ELEC-3.9.29 Supply and Transportation of 36W, 2' x2' 1 No


(600mm x 600mm) Recessed / Surface
mounted LED luminaire made of CRCA
sheet housing with powder coated with
acrylic diffuser, Constant current out put of
ELEC-3.9.30 Supply and Transportation
Driver operating voltage range of 36W, of 150 2' x2'
to 1 No
ELEC-3.9.30 (600mm
Supply and x 600mm)
Transportation
265 Volts AC, Power factor ≥ 0.9 high Recessed of /
36W Surface 1 No
mounted LED luminaire made of CRCA
ELEC-3.9.32 Recessed
power
Supply
sheet and/ Transportation
LEDs
housing
Surface
having
with
mounting
efficacy
powder of 2'
of45W
coated
≥ x100 2'
,with
2' x 2' 1 No
(600mm
lumens/watt,
(600mm x
x 600mm)
600mm) junction LED
slim luminaire
temperature
LED luminaire made
less of
than
acrylic
ELEC-3.9.33 (600mm
CRCA
85 degrees diffuser,
sheet x 600mm) Constant
housing
centigrade slim with
and current
LEDpowder
THDluminaireout
is coatedput of
less 1 No
Round
Driver // Square
operating with
voltage System range Lumens
of 150 out of
to
ELEC-3.9.34 Round
with
Supply
than
≥3000, acrylic
12% and Square
diffuser, Housing
transportation
etc.,
Housing Constant
complete.company.
Made
Made
of MS
of Aluminum
offrame
current alloywith 1 No
265
put of
powder Volts
Aluminum
LUMINAIRE Driver AC,
alloy
coating Power with
operating
MAKE suitable factor
corrosion
: Phillipsfor ≥ 0.9
600mm
- / OSRAM high
resistant x
with
ELEC-3.9.35 Supply
power corrosion
&coat,
LEDs Fixing resistant
having ofacrylic
LEDefficacypowder
box of ≥coat,
type batten with/ 1 No
powder
voltage
600mm
GE / Crompton
Diffuser
frame made range
LED
, operating
with
of/ 150
panel
with Bajaj
CRCA to/ 265
light.
voltage
diffuser,
Havells
sheet Volts
range / 100
powder
Constant
AC,
Halonix
of 100 /
3.10 lumens/watt,
current
LED
Power
HPL.LED INDOOR outMAKE
factor put junction
≥ of:Driver
LAMPS
0.9 high
PHILIPS temperature
operating
power LEDs
LUMILEDS less
voltage than
having
/
to 270
coated
85 degrees Volts AC,
centigrade P.F Volts
≥ 0.95,
and Surge
THD is less
ELEC-3.10.1 range
efficacy
Supply
CREE
protection:
of/of 150
of ≥2KV,
0.5W
NICHIA 90to lumens/watt,
265
LED
/THD<10%,
OSRAM Lamp AC,
/ with Power
junction
SAMSUNG
Inbuilt input factor
/ 1 No
than
≥ 0.9 12%
high
temperature
voltage
LG LEDs. 90 etc.,
power
to less complete.
300V, LEDs
than Colour85having
degrees efficacy
temparature of ≥
Electrical
ELEC-3.10.2 100
Supply
LUMINAIRE of protections
lumens/watt, 3.0W MAKE: LED like Over/Under
Lamp
Pharox
junction with
/ Surya input/ less 1 No
centigrade
3000k
voltage, - 90 6500k,and
short THD
Beam
circuit, lesstemperature
isOver
angle than
170
load, -12%
Open 220
ELEC-3.10.3 voltage
Syska
than
Supply
etc.,
degrees, 85 / of
complete.Mueluxto
degrees
5.0W
B22
300V,
base, / Colour
Fortune
centigrade
LED 40Lamp Art
Lumens.
temparature
/
and
with Capart
THD /is
input 1 No
Circuit,
3000k
Green
less than Miswiring
-lites
6500k,
12%, Beam
/ Kashyap with
minimum high
angle
BLU power
170
/with
CRI≥70, R-LED - LED's
220 / GM /
ELEC-3.10.4 voltage
LUMINAIRE
Makes:
Supply
having
degrees, of90 to
Phillips
7.0W
efficacy
B22
300V,
MAKE of
base,/LED
OSRAM

Colour
:210
110Trinic
Lamp /temparature
/ GE Avni /ofetc.,
/ input
lumens/watt,CCT:
Lumens Kripa
Crompton Makes:/ 1 No
Million.
complete.
3000k
Lights -
/-of 6500k, Beam angle 170 - 220
VIN
ELEC-3.10.5 voltage
3000K
Supply
LED
/ Bajaj
Phillips
LUMINAIRE
degrees, MAKE /Stanjo
90 to
5700K,
OSRAM
LED
B22
/Candel
/ Havells
300V,
: MAKE:
PHILIPS
base,
Cosmo
minimum
/ GEColour
350 / /Crompton
/ Pharox
LampVRILISO
LUMILEDS
Pharox Lumens
/ Halonix
temparature
CRI≥70,
/ for
Surya of
/ Pro-Lite
// CREE
VIN
shandliers.
/
//
Makes: / 1 No
/Makes:
Goldwyn
Greenlites.
3000k
Manufacture
Bajaj -
/ Havells /
6500k,
PhillipsScintilla
has Beam to
/ /Halonix
OSRAM / JSTC
submitangle Solar.
170
LM79,LM80
/ Green
/ GE - 220
lites.
//Crompton &/ /
3.11 NICHIA
Muelux
Phillips
LED
LED TYPE
MAKE /
/ OSRAM
Fortune
OSRAM
STREET
: PHILIPS //
Art SAMSUNG
GE / Syska
/
LIGHTS Crompton
LUMILEDS / Green LG / / LEDs.
lites.
VIN
CREE
degrees,
Photobiological
Makes:
VIN
LED
Bajaj /MAKE
Bajaj
/ Havells
B22
Phillips base,
/ //Safety
/ :Havells
PHILIPS OSRAM
Halonix
490
/ Pharox Lumens.
Report.
LUMILEDS
/ Green /Luminaire
/ GE/ Halonix Crompton
lites./ CREE / ///
NICHIA
Makes:
Performance / OSRAM
Phillips Complies /
OSRAMSAMSUNG / GE
to /IS10322 // LG
Crompton LEDs/ //
VIN
Green
NICHIA
Makes:
VIN
/ Bajaj
/
lites.
Bajaj
/ Havells
/ OSRAM
Phillips
/ Havells / OSRAM / Pharox
/ SAMSUNG
/ Pharox GE// Halonix LG(Part
//Crompton
Halonix LEDs
5/Sec
Green
VIN 3)lites.
/ Bajaj & IEC
/ Havells60598-1,IEC / Pharox60529 / Halonix and//
Green
Manufacture lites
Green lites. should be ISO certifiedcompany.LUMINAIRE
MAKE : Phillips - /
OSRAM / GE / Crompton / Bajaj / Havells /
Halonix / HPL.LED MAKE : PHILIPS
LUMILEDS / CREE / NICHIA / OSRAM /
SAMSUNG / LG LEDs.
#REF! ELEC-3.11.1 Supply and transportation of ......... LED Street light
Body made of high grade pressure die – cast
Aluminum alloy with corrosion resistant powder coat,
having protective toughened glass cover, Less Glare,
IP 66 (Silicon gasket ensures Optical & Electrical
compartments are IP 66) protected, universal Voltage
100 - 270 V AC, P.F, ≥ 0.90, high power LED's having
efficacy ≥130 lumens/watt, and junction temperature <
75°C, with Ingress protection IP66, Driver surge
protection 4KV, with optics distribution Type II
medium, THD<10% at 110 Volts AC, driver efficiency
≥90%, CCT: 5600K, minimum CRI≥80, Inbuilt
Electrical protections like Over voltage, short circuit,
Over load, Open Circuit, Miswiring, Intelligent pole
mounting option provides flexibility of vertical or
horizontal pole mounting option complete, with Top
Openable Maintenance and Manufacture has to
submit LM79,LM80 & Photobiological Safety Report.
Luminaire Performance Complies to IS10322 (Part
5/Sec 3) & IEC 60598-1,IEC 60529 and ISO certified
company.
LUMINAIRE MAKE : PHILIPS / OSRAM / GE /
CROMPTON / BAJAJ / SCHREDER / VIN / HALONIX
/ HAVELLS / HPL.
LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA /
OSRAM / SAMSUNG / LG LEDs.

#REF! ELEC-3.11.1a 20W 1 No

#REF! ELEC-3.11.1b 30W 1 No

#REF! ELEC-3.11.1c 43/45W 1 No

#REF! ELEC-3.11.1d 60/65W 1 No


#REF! ELEC-3.11.1e 72W 1 No

#REF! ELEC-3.11.1f 90W 1 No

#REF! ELEC-3.11.1g 120W 1 No


#REF! ELEC-3.11.1h 150W 1 No
ELEC-3.11.1i 180W 1 No

#REF! ELEC-3.11.1j 210W 1 No


ELEC-3.11.2 Supply and transportation of ......... LED
Street light Luminaire made of high grade
aluminum pressure die cast housing body
with powder coated, having protective
toughened glass (Silicon gasket ensures
Optical & Electrical compartments are IP 66
)protected, Supply Input voltage 120 - 270
V AC, P.F ≥ 0.90, high power LED's having
efficacy ≥120 lumens/watt, System efficacy
≥95lm/W and junction temperature < 70°C,
with Ingress protection IP65, Driver surge
protection 4KV, external Surge protection ≥
5KV with optics distribution Type II medium,
THD<10% at 110 Volts AC, driver efficiency
≥ 90%, CCT: 3000K - 5700K, minimum
CRI≥70, etc., complete.LUMINAIRE MAKE
: AVNI / GOLDWYN / SURYA / MUELUX /
KRIPA LIGHTS / / SYSKA / FORTUNE
ART / CAPART / GREENLITES / R-LED /
POLYCAB / INSTA POWER / GM /
MILLION / JAQUAR.LED MAKE : PHILIPS
LUMILEDS / CREE / NICHIA / OSRAM /
SAMSUNG / LG LEDs

ELEC-3.11.2a 20W 1 No

ELEC-3.11.2b 30W 1 No

ELEC-3.11.2c 43/45W 1 No

ELEC-3.11.2d 60/65W 1 No

ELEC-3.11.2e 72W 1 No

ELEC-3.11.2f 90W 1 No

ELEC-3.11.2g 120W 1 No
ELEC-3.11.2h 150W 1 No
ELEC-3.11.2i 180W 1 No

ELEC-3.11.2j 210W 1 No
ELEC-3.11.3 Supply and transportation of ......... .LED
Street light Luminaire made of pressure die
cast aluminum body with powder coated,
having protective toughened glass (Silicon
gasket ensures Optical & Electrical
compartments are IP 66 )protected, Supply
Input voltage 120 - 270 V AC, P.F ≥ 0.90,
high power LED's having efficacy ≥100
lumens/watt, System efficacy ≥85lm/W and
junction temperature < 70°C, with Ingress
protection IP65, Driver surge protection
4KV, external Surge protection ≥ 5KV with
optics distribution Type II medium,
THD<10% at 110 Volts AC, driver efficiency
≥90%, w, CCT: 3000K - 5700K, minimum
CRI≥70, etc., complete.
LUMINAIRE MAKE : STANJO / COSMO /
TRINIC / VRILISO / KASHYAP BLU / PROLITE
/ SCINTILLA.
LED MAKE : PHILIPS LUMILEDS / CREE /
NICHIA / OSRAM / SAMSUNG / LG LEDs.

ELEC-3.11.3a 20W 1 No

ELEC-3.11.3b 30W 1 No

ELEC-3.11.3c 43/45W 1 No

ELEC-3.11.3d 60/65W 1 No

ELEC-3.11.3e 90W 1 No

ELEC-3.11.3f 120W 1 No

ELEC-3.11.3g 150W 1 No

ELEC-3.11.3h 180W 1 No

ELEC-3.11.3i 210W 1 No

ELEC-3.11.4 Flood light Luminaire made of pressure die


cast aluminum housing with powder
coated, having toughened glass cover,IP
65/66 (Silicon gasket ensures Optical &
Electrical compartments are IP 66
)protected, input voltage range of 100 to
270 volts AC,power factor ≥ 0.90, high
power LED's having efficacy 130
lumens/watt and junction temperature < 85
degree centigrade of IP65 with optics, total
harmonic distortion less than 10% at 110
Volts AC, driver efficiency ≥90% etc
complete. LUMINAIRE MAKE : PHILIPS /
OSRAM / GE / CROMPTON / BAJAJ /
SCHREDER / VIN / HALONIX / HAVELLS /
HPL.LED MAKE : PHILIPS LUMILEDS /
CREE / NICHIA / OSRAM / SAMSUNG /
LG LEDs.

ELEC-3.11.4a 60W 1 No
ELEC-3.11.4b 90W 1 No

ELEC-3.11.4c 120W 1 No

ELEC-3.11.5 Supply and transportation of ......... LED


Flood light Luminaire made of pressure die
cast aluminum housing with powder
coated, having toughened glass cover,IP
65/66 (Silicon gasket ensures Optical &
Electrical compartments are IP 66
)protected, input voltage range of 100 to
270 volts AC,power factor ≥ 0.90, high
power LED's having efficacy 120
lumens/watt and junction temperature < 85
degree centigrade of IP65 with optics, total
harmonic distortion less than 15% at 110
Volts AC, driver efficiency ≥90% etc
complete.
LUMINAIRE MAKE : PHAROX / AVNI /
GOLDWYN / SURYA / MUELUX / KRIPA
LIGHTS / FORTUNE ART / CAPART /
SYSKA / STANJO / GREENLITES / TRINIC
/ PRO-LITE / SCINTILLA / JSTC - SOLAR /
INSTA POWER / GM / MILLION /
JAQUAR.
LED MAKE : PHILIPS LUMILEDS / CREE /
NICHIA / OSRAM / SAMSUNG / LG LEDs.

ELEC-3.11.5a 60W 1 No

ELEC-3.11.5b 90W 1 No

ELEC-3.11.5c 120W 1 No

3.12 LED DRIVERS


ELEC-3.12.1 Supply and transportation of LED Driver 1 No
with input line voltage 120V-270V AC, 50Hz
with surge protection more than 2.5 KV,
IP20, suitable for 6 / 9 W LED down lighter
with 2 Years Warranty.
LUMINAIRE MAKE : PHILIPS / OSRAM / GE /
CROMPTON / BAJAJ / SCHREDER / VIN / HALONIX
/ HAVELLS / HPL

ELEC-3.12.2 Supply and transportation of LED Driver 1 No


with input line voltage 120V-270V AC, 50Hz
with surge protection more than 2.5 KV,
IP20, suitable for 6 / 9 W LED down lighter
with 2 Years Warranty.
SURYA / KRIPA LIGHTS / FORTUNE ART / CAPART
/ SYSKA / STANJO / GREENLITES / TRINIC / PROLITE
/ SCINTILLA / JSTC - SOLAR / INSTA POWER /
GM / MILLION / JAQUAR.

ELEC-3.12.3 Supply and transportation of LED Driver 1 No


with input line voltage 120V-270V AC, 50Hz
with surge protection more than 2.5 KV,
IP20, suitable for 12 / 18 W LED down
lighter with 2 Years Warranty.
LUMINAIRE MAKE : PHILIPS / OSRAM / GE /
CROMPTON / BAJAJ / SCHREDER / VIN / HALONIX
/ HAVELLS / HPL
ELEC-3.12.4 Supply and transportation of LED Driver 1 No
with input line voltage 120V-270V AC, 50Hz
with surge protection more than 2.5 KV,
IP20, suitable for 12 / 18 W LED down
lighter with 2 Years Warranty.
LUMINAIRE MAKE : PHAROX / AVNI / GOLDWYN /
SURYA / KRIPA LIGHTS / FORTUNE ART / CAPART
/ SYSKA / STANJO / GREENLITES / TRINIC / PROLITE
/ SCINTILLA / JSTC - SOLAR / INSTA POWER /
GM / MILLION / JAQUAR.

ELEC-3.12.5 Supply and transportation of LED Driver 1 No


with input line voltage 120V-270V AC, 50Hz
with surge protection more than 2.5 KV,
IP20, suitable for 36W, 2'x2' panel light with
2 Years Warranty.
LUMINAIRE MAKE : PHILIPS / OSRAM / GE /
CROMPTON / BAJAJ / SCHREDER / VIN / HALONIX
/ HAVELLS / HPL.

ELEC-3.12.6 Supply and transportation of LED Driver 1 No


with input line voltage 120V-270V AC, 50Hz
with surge protection more than 2.5 KV,
IP20, suitable for 36W, 2'x2' panel light with
2 Years Warranty.
LUMINAIRE MAKE : PHAROX / AVNI / GOLDWYN /
SURYA / KRIPA LIGHTS / FORTUNE ART / CAPART
/ SYSKA / STANJO / GREENLITES / TRINIC / PROLITE
/ SCINTILLA / JSTC - SOLAR / INSTA POWER /
GM / MILLION / JAQUAR..

ELEC-3.12.7 Supply and transportation of LED Driver 1 No


with input line voltage 120V-270V AC, 50Hz
with surge protection more than 2.5 KV,
IP20, suitable for 40/45W, 2'x2' panel light
with 2 Years Warranty.
LUMINAIRE MAKE : PHILIPS / OSRAM / GE /
CROMPTON / BAJAJ / SCHREDER / VIN / HALONIX
/ HAVELLS / HPL.

ELEC-3.12.8 Supply and transportation of LED Driver 1 No


with input line voltage 120V-270V AC, 50Hz
with surge protection more than 2.5 KV,
IP20, suitable for 40/45W, 2'x2' panel light
with 2 Years Warranty.
LUMINAIRE MAKE : PHAROX / AVNI / GOLDWYN /
SURYA / KRIPA LIGHTS / FORTUNE ART / CAPART
/ SYSKA / STANJO / GREENLITES / TRINIC / PROLITE
/ SCINTILLA / JSTC - SOLAR / INSTA POWER /
GM / MILLION / JAQUAR

ELEC-3.12.9 Supply and transportation of LED Driver 1 No


with input line voltage 120V-270V AC, 50Hz
with surge protection of 4.0 KV, IP20,
suitable for 15-30W, LED street light fitting
with 2 Years Warranty.
LUMINAIRE MAKE : PHILIPS / OSRAM / GE /
CROMPTON / BAJAJ / SCHREDER / VIN / HALONIX
/ HAVELLS / HPL.
ELEC-3.12.10 Supply and transportation of LED Driver 1 No
with input line voltage 120V-270V AC, 50Hz
with surge protection of 4.0 KV, IP20,
suitable for 15-30W, LED street light fitting
with 2 Years Warranty.
LUMINAIRE MAKE : PHAROX / AVNI / GOLDWYN /
SURYA / KRIPA LIGHTS / FORTUNE ART / CAPART
/ SYSKA / STANJO / GREENLITES / TRINIC / PROLITE
/ SCINTILLA / JSTC - SOLAR / INSTA POWER /
GM / MILLION / JAQUAR.

ELEC-3.12.11 Supply and transportation of LED Driver 1 No


with input line voltage 120V-270V AC, 50Hz
with surge protection of 4.0 KV, IP20,
suitable for 45-80W, LED street light fitting
with 2 Years Warranty.
LUMINAIRE MAKE : PHILIPS / OSRAM / GE /
CROMPTON / BAJAJ / SCHREDER / VIN / HALONIX
/ HAVELLS / HPL.

ELEC-3.12.12 Supply and transportation of LED Driver 1 No


with input line voltage 120V-270V AC, 50Hz
with surge protection of 4.0 KV, IP20,
suitable for 45-80W, LED street light fitting
with 2 Years Warranty.
LUMINAIRE MAKE : PHAROX / AVNI / GOLDWYN /
SURYA / KRIPA LIGHTS / FORTUNE ART / CAPART
/ SYSKA / STANJO / GREENLITES / TRINIC / PROLITE
/ SCINTILLA / JSTC - SOLAR / INSTA POWER /
GM / MILLION / JAQUAR

ELEC-3.12.13 Supply and transportation of LED Driver 1 No


with input line voltage 120V-270V AC, 50Hz
with surge protection of 4.0 KV, IP20,
suitable for 90-180W, LED street light fitting
with 2 Years Warranty.
LUMINAIRE MAKE : PHILIPS / OSRAM / GE /
CROMPTON / BAJAJ / SCHREDER / VIN / HALONIX
/ HAVELLS / HPL.

ELEC-3.12.14 Supply and transportation of LED Driver 1 No


with input line voltage 120V-270V AC, 50Hz
with surge protection of 4.0 KV, IP20,
suitable for 90-180W, LED street light fitting
with 2 Years Warranty.
LUMINAIRE MAKE : PHAROX / AVNI / GOLDWYN /
SURYA / KRIPA LIGHTS / FORTUNE ART / CAPART
/ SYSKA / STANJO / GREENLITES / TRINIC / PROLITE
/ SCINTILLA / JSTC - SOLAR / INSTA POWER /
GM / MILLION / JAQUAR..

3.13 INDUCTION LUMINARIES


#REF! ELEC-3.13.1 Supply and Transportation of Induction
Type street light luminaire of following
capacities comprises of single piece die
cast Aluminium body and IP65 protection
including Induction lamp and ballast etc.,
Complete with 5 years warranty.
Makes : Crompton / Bajaj / Surya / LVD
RAES / Billion Light / Fortune Art / Synergy
Solutions / Tej-Kashyap

ELEC-3.13.1a 80W 1 No
ELEC-3.13.1b 120W 1 No

#REF! ELEC-3.13.2 Supply and Transportation of Induction


Type Flood light luminaire of following
capacities comprises of single piece die
cast Aluminium body and IP65 protection of
including Induction lamp and ballast etc.,
Complete with 5 years warranty.
Makes : Crompton / Bajaj / Surya / LVD
RAES / Billion Light / Fortune Art / Synergy
Solutions / Tej-Kashyap

ELEC-3.13.2a 150W 1 No

ELEC-3.13.2b 200W 1 No

3.14 BALLASTS FOR INDUCTION LAMPS


#REF! ELEC-3.14.1 Supply of 80W ballasts for Induction Lamp.
Makes : Crompton / Bajaj / Surya / Synergy
Solutions / Fortune Art / Billion Light.
ELEC-3.14.2 Supply of 120W ballasts for Induction
Lamp Makes : Crompton / Bajaj / Surya / Synergy
Solutions / Fortune Art / Billion Light.
ELEC-3.14.3 Supply of 150W ballasts for Induction
Lamp.
Makes : Crompton / Bajaj / Surya / Synergy
Solutions / Fortune Art / Billion Light.
ELEC-3.14.4 Supply of 200W ballasts for Induction
Lamp.
Makes : Crompton / Bajaj / Surya / Synergy
Solutions / Fortune Art / Billion Light

SECTION - 4
4.1 U.G. CABLES
1 ELEC-4.1.1 Supply of 4 Sqmm 2 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) of Makes : Torrent / Universal / Unicab /
Polycab / Havells / Gloster / KEI.

2 ELEC-4.1.2 Supply of 4 Sqmm 2 Core XLPE insulated, 1100V grade 1 Mtr


armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) of Makes : RPG / Finolex / Paragon / V-
Guard / Fortune Art / Suncab / Finecab / Gemscab / Payal

3 ELEC-4.1.3 Supply of 6 Sqmm 2 Core XLPE insulated, 1100V 1 Mtr


grade
armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) of Makes : Torrent / Universal / Unicab /
Polycab / Havells / Gloster / KEI
4 ELEC-4.1.4 Supply of 6 Sqmm 2 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) ofMakes : RPG / Finolex / Paragon / V-
Guard / Fortune Art / Suncab / Finecab / Gemscab
/ Payal

5 ELEC-4.1.5 Supply of 10 Sqmm 2 Core XLPE insulated, 1100V grade 1 Mtr


armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) of Makes : Torrent / Universal / Unicab /
Polycab / Havells / Gloster / KEI.

6 ELEC-4.1.6 Supply of 10 Sqmm 2 Core XLPE insulated, 1100V grade 1 Mtr


armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) of Makes : RPG / Finolex / Paragon / V-
Guard / Fortune Art / Suncab / Finecab / Gemscab / Payal.

7 ELEC-4.1.7 Supply of 6 Sqmm 4 Core XLPE insulated, 1100V grade 1 Mtr


armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) of Makes : Torrent / Universal / Unicab /
Polycab / Havells / Gloster / KEI.

8 ELEC-4.1.8 Supply of 6 Sqmm 4 Core XLPE insulated, 1100V grade 1 Mtr


armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) ofMakes : RPG / Finolex / Paragon / V-
Guard / Fortune Art / Suncab / Finecab / Gemscab
/ Payal.

9 ELEC-4.1.9 Supply of 10 Sqmm 4 Core XLPE insulated, 1100V grade 1 Mtr


armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) of makes Makes : Torrent / Universal /
Unicab / Polycab / Havells / Gloster / KEI.

10 ELEC-4.1.10 Supply of 10 Sqmm 4 Core XLPE insulated, 1100V grade 1 Mtr


armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) of Makes : RPG / Finolex / Paragon / V-
Guard
/ Fortune Art / Suncab / Finecab / Gemscab
/ Payal.

11 ELEC-4.1.11 Supply of 16 Sqmm 4 Core XLPE insulated, 1100V grade 1 Mtr


armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) of Makes : Torrent / Universal / Unicab /
Polycab / Havells / Gloster / KEI.

12 ELEC-4.1.12 Supply of 16 Sqmm 4 Core XLPE insulated, 1100V grade 1 Mtr


armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) ofMakes : RPG / Finolex / Paragon / V-
Guard
/ Fortune Art / Suncab / Finecab / Gemscab
/ Payal.
13 ELEC-4.1.13 Supply of 25 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) ofMakes : Torrent / Universal / Unicab /
Polycab / Havells / Gloster / KEI.

14 ELEC-4.1.14 Supply of 25 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) ofMakes : RPG / Finolex / Paragon / V-
Guard
/ Fortune Art / Suncab / Finecab / Gemscab
/ Payal.

15 ELEC-4.1.15 Supply of 35 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming
to IS:7098 (Part - I) of Makes : Torrent / Universal / Unicab /
Polycab / Havells / Gloster / KEI.

16 ELEC-4.1.16 Supply of 35 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) of Makes : RPG / Finolex / Paragon / V-
Guard
/ Fortune Art / Suncab / Finecab / Gemscab
/ Payal.

17 ELEC-4.1.17 Supply of 50 Sqmm 3.5 Core.XLPE PVC armoured 1 Mtr


alluminium cable of Makes : Torrent / Universal / Unicab /
Polycab / Havells / Gloster / KEI.
18 ELEC-4.1.18 Supply of 50 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) of Makes : RPG / Finolex / V-Guard / Gloster
/
Suncab / Finecab / Gemscab

19 ELEC-4.1.19 Supply of 70 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) of Makes : Torrent / Universal / Unicab /
Polycab / Havells / Gloster / KEI.

20 ELEC-4.1.20 Supply of 70 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming
to IS:7098 (Part - I) of Makes : RPG / Finolex / V-Guard /
Gloster /
Suncab / Finecab / Gemscab

21 ELEC-4.1.21 Supply of 95 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) ofMakes : Torrent / Universal / Unicab /
Polycab / Havells / Gloster / KEI.
22 ELEC-4.1.22 Supply of 95 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming
to IS:7098 (Part - I) ofMakes : RPG / Finolex / V-Guard /
Gloster /
Suncab / Finecab / Gemscab

23 ELEC-4.23 Supply of 120 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) ofMakes : Torrent / Universal / Unicab /
Polycab / Havells / Gloster / KEI.

24 ELEC-4.1.24 Supply of 120 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) ofMakes : RPG / Finolex / V-Guard /
Gloster /
Suncab / Finecab / Gemscab

25 ELEC-4.1.25 Supply of 150 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) of Makes : Torrent / Universal / Unicab /
Polycab / Havells / Gloster / KEI.

26 ELEC-4.1.26 Supply of 150 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) ofMakes : RPG / Finolex / V-Guard /
Gloster /
Suncab / Finecab / Gemscab

27 ELEC-4.1.27 Supply of 185 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming
to IS:7098 (Part - I) ofMakes : Torrent / Universal / Unicab /
Polycab / Havells / Gloster / KEI.

28 ELEC-4.1.28 Supply of 185 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) of Makes : RPG / V-Guard.

29 ELEC-4.1.29 Supply of 240 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) ofMakes : Torrent / Universal / Unicab /
Polycab / Havells / Gloster / KEI.

30 ELEC-4.1.30 Supply of 240 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) of Makes : RPG / V-Guard.

31 ELEC-4.1.31 Supply of 300 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) of Makes : Torrent / Universal / Unicab /
Polycab / Havells / Gloster / KEI.
32 ELEC-4.1.32 Supply of 300 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) of Makes : RPG / V-Guard.

33 ELEC-4.1.33 Supply of 400 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) ofMakes : Torrent / Universal / Unicab /
Polycab / Havells / Gloster / KEI.

34 ELEC-4.1.34 Supply of 400 Sqmm 3.5 Core XLPE insulated, 1100V grade 1 Mtr
armoured alluminium cable as per specification confirming to
IS:7098 (Part - I) of Makes : RPG / V-Guard.
35 4.2 11 KV H.T. XLPE CABLES
36 ELEC-4.2.1 Supply of 3 Core 11 KV 35 Sqmm HT XLPE (E) armoured 1 RM
Cable, as per IS specification confirming to IS 7098/II/85 with
latest ammendments. Makes Torrent / Universal / CCI
/ Polycab / KEI / Unicab.

37 ELEC-4.2.2 Supply of 3 Core 11 KV 50 Sqmm HT XLPE (E) armoured 1 RM


Cable, as per IS specification confirming to IS 7098/II/85 with
latest ammendments.Makes Torrent / Universal / CCI /
Polycab / KEI / Unicab.

38 ELEC-4.2.3 Supply of 3 Core 11 KV 70 Sqmm HT XLPE (E) armoured 1 RM


Cable, as per IS specification confirming to IS 7098/II/85 with
latest ammendments.Makes Torrent / Universal / CCI /
Polycab / KEI / Unicab.

39 ELEC-4.2.4 Supply of 3 Core 11 KV 95 Sqmm HT XLPE (E) armoured 1 RM


Cable, as per IS specification confirming to IS 7098/II/85 with
latest ammendments.Makes Torrent / Universal / CCI /
Polycab / KEI / Unicab.

40 ELEC-4.2.5 Supply of 3 Core 11 KV 120 Sqmm HT XLPE (E) armoured 1 RM


Cable, as per IS specification confirming to IS 7098/II/85 with
latest ammendments.Makes Torrent / Universal / CCI /
Polycab / KEI / Unicab.

41 ELEC-4.2.6 Supply of 3 Core 11 KV 150 Sqmm HT XLPE (E) armoured 1 RM


Cable, as per IS specification confirming to IS 7098/II/85 with
latest ammendments.Makes Torrent / Universal / CCI /
Polycab / KEI / Unicab.

42 ELEC-4.2.7 Supply of 3 Core 11 KV 185 Sqmm HT XLPE (E) armoured 1 RM


Cable, as per IS specification confirming to IS 7098/II/85
with latest ammendments.Makes Torrent / Universal / CCI /
Polycab / KEI / Unicab.

ELEC-4.2.8 Supply of 3 Core 11 KV 240 Sqmm HT XLPE (E) armoured 1 RM


Cable, as per IS specification confirming to IS 7098/II/85
with latest ammendments.Makes Torrent / Universal / CCI /
Polycab / KEI / Unicab.

ELEC-4.2.9 Supply of 3 Core 11 KV 300 Sqmm HT XLPE (E) armoured 1 RM


Cable, as per IS specification confirming to IS 7098/II/85
with latest ammendments.Makes Torrent / Universal / CCI /
Polycab / KEI / Unicab.
43 4.3 CABLE GLANDS
44 ELEC-4.3.1 Supply and Fixing of Single compression brass cable glands 1 No
for 3.5 core XLPE armoured cable for 185Sqmm with brass
washers complete.

45 ELEC-4.3.2 Supply and Fixing of Single compression brass cable glands 1 No


for 3.5 core XLPE armoured cable for 240Sqmm with brass
washers complete.

46 ELEC-4.3.3 Supply and Fixing of Single compression brass cable glands 1 No


for 3.5 core XLPE armoured cable for 300Sqmm with brass
washers complete.

47 ELEC-4.3.4 Supply and Fixing of Single compression brass cable glands 1 No


for 3.5 core XLPE armoured cable for 400Sqmm with brass
washers complete.

48 ELEC-4.3.5 Supply and Fixing of single compression brass cable glands 1 No


for 4 core XLPE armoured cable up to 16.0 Sq.mm with
brass washers complete.

49 ELEC-4.3.6 Supply and Fixing of single compression brass cable glands 1 No


for 3.5 core XLPE armoured cable from 25 Sqmm to 50.0
Sq.mm with brass washers complete.

50 ELEC-4.3.7 Supply and Fixing of Single compression brass cable glands 1 No


for 3.5 core XLPE armoured cable from 70 Sqmm to 150.0
Sq.mm with brass washers complete.

51 4.4 LUGS
52 ELEC-4.4.1 Supply and fixing of crimping type copper lugs confirming to 1 No
I.S specifications for cable upto 16 Sq.mm including nuts and
bolts with connections.

53 ELEC-4.4.2 Supply and fixing of crimping type copper lugs confirming to 1 No


I.S specifications for cable of 25 Sq.mm including nuts and
bolts with connections.

54 ELEC-4.4.3 Supply and fixing of crimping type copper lugs confirming to 1 No


I.S specifications for cable of 35 Sq.mm including nuts and
bolts with connections.

55 ELEC-4.4.4 Supply and fixing of crimping type copper lugs confirming to 1 No


I.S specifications for cable of 50 Sq.mm including nuts and
bolts with connections.

56 ELEC-4.4.5 Supply and fixing of crimping type copper lugs confirming to 1 No


I.S specifications for cable of 70 Sq.mm including nuts and
bolts with connections.

57 ELEC-4.4.6 Supply and fixing of crimping type copper lugs confirming to 1 No


I.S specifications for cable of 95 Sq.mm including nuts and
bolts with connections.

58 ELEC-4.4.7 Supply and fixing of crimping type copper lugs confirming to 1 No


I.S specifications for cable of 120 Sq.mm including nuts and
bolts with connections.
59 ELEC-4.4.8 Supply and fixing of crimping type copper lugs confirming to 1 No
I.S specifications for cable of 150 Sq.mm including nuts and
bolts with connections.

60 ELEC-4.4.9 Supply and fixing of crimping type copper lugs confirming to 1 No


I.S specifications for cable of 185 Sq.mm including nuts and
bolts with connections.
61 ELEC-4.4.10 Supply and fixing of crimping type copper lugs confirming to 1 No
I.S specifications for cable of 240 Sq.mm including nuts and
bolts with connections.

62 ELEC-4.4.11 Supply and fixing of crimping type copper lugs confirming to 1 No


I.S specifications for cable of 300 Sq.mm including nuts and
bolts with connections.

63 ELEC-4.4.12 Supply and fixing of crimping type copper lugs confirming to 1 No


I.S specifications for cable of 400 Sq.mm including nuts and
bolts with connections.

64 ELEC-4.4.13 Supply and fixing of crimping type aluminium lugs 1 No


confirming to I.S specifications for cable upto 16 Sq.mm
including nuts and bolts with connections.

65 ELEC-4.4.14 Supply and fixing of crimping type aluminium lugs 1 No


confirming to I.S specifications for cable of 25 Sq.mm
including nuts and bolts with connections.

66 ELEC-4.4.15 Supply and fixing of crimping type aluminium lugs 1 No


confirming to I.S specifications for cable of 35 Sq.mm
including nuts and bolts with connections.

67 ELEC-4.4.16 Supply and fixing of crimping type aluminium lugs 1 No


confirming to I.S specifications for cable of 50 Sq.mm
including nuts and bolts with connections.

68 ELEC-4.4.17 Supply and fixing of crimping type aluminium lugs 1 No


confirming to I.S specifications for cable of 70 Sq.mm
including nuts and bolts with connections.

69 ELEC-4.418 Supply and fixing of crimping type aluminium lugs 1 No


confirming to I.S specifications for cable of 95 Sq.mm
including nuts and bolts with connections.

70 ELEC-4.4.19 Supply and fixing of crimping type aluminium 1 No


lugsconfirming to I.S specifications for cable of 120
Sq.mm including nuts and bolts with connections.

71 ELEC-4.4.20 Supply and fixing of crimping type aluminium lugs 1 No


confirming to I.S specifications for cable of 150 Sq.mm
including nuts and bolts with connections.

72 ELEC-4.4.21 Supply and fixing of crimping type aluminium lugs 1 No


confirming to I.S specifications for cable of 185 Sq.mm
including nuts and bolts with connections.

73 ELEC-4.4.22 Supply and fixing of crimping type aluminium lugs 1 No


confirming to I.S specifications for cable of 240 Sq.mm
including nuts and bolts with connections.
74 ELEC-4.4.23 Supply and fixing of crimping type aluminium lugs 1 No
confirming to I.S specifications for cable of 300 Sq.mm
including nuts and bolts with connections.

75 ELEC-4.4.24 Supply and fixing of crimping type aluminium lugs 1 No


confirming to I.S specifications for cable of 400 Sq.mm
including nuts and bolts with connections.

76 4.5 CABLE JOINTS


77 HEAT SHRINKABLE LT CABLE JOINTS
78 ELEC-4.5.1 Supply of heat shrinkable straight through joint Indoor / Out 1 No
door for L.T. XLPE Armoured 1100V grade cable complete
with necessary accessories and suitable clamps including
cost and conveyance of materials complete for 10 to 16
Sqmm. Makes Raychem / M Seal / Denson / Multy.

79 ELEC-4.5.2 Supply of heat shrinkable straight through joint Indoor / Out 1 No


door for L.T. XLPE Armoured 1100V grade cable complete
with necessary accessories and suitable clamps including
cost and conveyance of materials complete for 25 to 50
Sqmm. Makes Raychem / M Seal / Denson / Multy.

80 ELEC-4.5.3 Supply of heat shrinkable straight through joint Indoor /Out 1 No


door for L.T. XLPE Armoured 1100V grade cable complete
with necessary accessories and suitable clamps including
cost and conveyance of materials complete for 70 to 185
Sqmm. Makes Raychem/ M Seal /Denson /Multy.

81 ELEC-4.5.4 Supply and errecting heat shrinkable straight through joint 1 No


Indoor / Out door for L.T. XLPE Armoured 1100V grade
cable complete with necessary accessories and suitable
clamps including cost and conveyance of materials and all
labour charges etc., complete for 240 to 300 Sqmm. Makes
Raychem / M Seal / Denson / Multy.

82 ELEC-4.5.5 Supply of heat shrinkable straight through joint Indoor /Out 1 No


door for L.T.XLPE Armoured 1100V grade cable complete with
necessary accessories and suitable clamps including cost and
conveyance of materials complete for 400 Sqmm. Makes
Raychem / M Seal / Denson / Multy.

83 4.6 3 CORE 11 KV HT CABLE STRAIGHT THROUGH JOINTS

84 ELEC-4.6.1 Providing and erecting heat shrinkable straight through 1 No


joint out door / indoor for H.T, XLPE Insulated armoured cable
11000V grade complete with necessary accessories and
suitable clamps duly erected and connected to the supply for
the following multi core cables including cost and
conveyance of materials and all labour charges etc.,
complete for 16 to 35Sqmm.Makes Raychem / M Seal /
Denson / Multy.
85 ELEC-4.6.2 Providing and erecting heat shrinkable straight through 1 No
joint out door / indoor for H.T, XLPE Insulated armoured cable
11000V grade complete with necessary accessories and
suitable clamps duly erected and connected to the supply for
the following multi core cables including cost and
conveyance of materials and all labour charges etc.,
complete for 50 to 95Sqmm.Makes Raychem / M Seal /
Denson / Multy.

86 ELEC-4.6.3 Providing and erecting heat shrinkable straight through 1 No


joint out door / indoor for H.T, XLPE Insulated armoured cable
11000V grade complete with necessary accessories and
suitable clamps duly erected and connected to the supply for
the following multi core cables including cost and
conveyance of materials and all labour charges etc.,
complete for 120 to 185Sqmm.Makes Raychem / M Seal /
Denson / Multy.

87 4.7 HT END TERMINATION KITS


88 ELEC-4.7.1 Providing and errecting heat shrinkable indoor termination kit 1 No
for 11 KV XLPE HT cable 3 core 70 -95 Sqmm with
necessary materials etc., complete.Makes Raychem / M
Seal / Denson / Multy.

89 ELEC-4.7.2 Providing and errecting heat shrinkable indoor termination kit 1 No


for 11 KV XLPE HT cable 3 core 120 Sqmm with
necessary materials etc., complete.Makes Raychem / M
Seal/ Denson / Multy.

90 ELEC-4.7.3 Providing and errecting heat shrinkable indoor termination kit 1 No


for 11 KV XLPE HT cable 3 core 150 - 185 Sqmm with
necessary materials etc., complete.Makes Raychem / M
Seal / Denson / Multy.

ELEC-4.7.4 Providing and errecting heat shrinkable indoor termination kit 1 No


for 11 KV XLPE HT cable 3 core 240 - 300 Sqmm with
necessary materials etc., complete.Makes Raychem / M
Seal / Denson / Multy.

91 ELEC-4.7.5 Providing and errecting heat shrinkable outdoor 1 No


termination kit for 11 KV XLPE HT cable 3 core 70 - 95 Sqmm
with necessary materials etc., complete.Makes Raychem / M
Seal / Denson / Multy.

92 ELEC-4.7.6 Providing and errecting heat shrinkable outdoor 1 No


termination kit for 11 KV XLPE HT cable 3 core 120 Sqmm
with necessary materials etc., complete.Makes Raychem / M
Seal / Denson / Multy.

93 ELEC-4.7.7 Providing and errecting heat shrinkable outdoor termination kit 1 No


for 11 KV XLPE HT cable 3 core 150 - 185 Sqmm with
necessary materials etc., complete.Makes Raychem.
ELEC-4.7.8 Providing and errecting heat shrinkable outdoor termination kit 1 No
for 11 KV XLPE HT cable 3 core 150 - 185 Sqmm with
necessary materials etc., complete.Makes Raychem.
94 4.8 DOUBLE WALLED CORRUGATED HDPE PIPE
95 ELEC-4.8.1 Supply and Transportation of Outer dia 50mm and Inner dia 1 Mtr
38mm double walled corrugated HDPE duct made as per
specification BSEN - 500 86/IS 14930 Part-II. Makes:DURA
LINE (Dura Guard) or its equivalent make.

96 ELEC-4.8.2 Supply and Transportation of Outer dia 63mm and Inner dia 1 Mtr
51mm double walled corrugated HDPE duct made as per
specification BSEN - 500 86/IS 14930 Part-II. Makes:DURA
LINE (Dura Guard) or its equivalent make.

97 ELEC-4.8.3 Supply and Transportation of Outer dia 78mm and Inner dia 1 Mtr
63mm double walled corrugated HDPE duct made as per
specification BSEN - 500 86/IS 14930 Part-II. Makes:DURA
LINE (Dura Guard) or its equivalent make.

98 ELEC-4.8.4 Supply and Transportation of Outer dia 90mm and Inner dia 1 Mtr
76mm double walled corrugated HDPE duct made as per
specification BSEN - 500 86/IS 14930 Part-II. Makes:DURA
LINE (Dura Guard) or its equivalent make.

99 ELEC-4.8.5 Supply and Transportation of Outer dia 120mm and Inner dia 1 Mtr
103.50mm double walled corrugated HDPE duct made as per
specification BSEN - 500 86/IS 14930 Part-II. Makes:DURA
LINE (Dura Guard) or its equivalent make.

100 ELEC-4.8.6 Supply and Transportation of Outer dia 160mm and Inner dia 1 Mtr
136mm double walled corrugated HDPE duct made as per
specification BSEN - 500 86/IS 14930 Part-II. Makes:DURA
LINE (Dura Guard) or its equivalent make.

101 ELEC-4.8.7 Supply and Transportation of Outer dia 180mm and Inner dia 1 Mtr
152mm double walled corrugated HDPE duct made as per
specification BSEN - 500 86/IS 14930 Part-II. Makes:DURA
LINE (Dura Guard) or its equivalent make.

102 ELEC-4.8.8 Supply and Transportation of Outer dia 200mm and Inner dia 1 Mtr
170mm double walled corrugated HDPE duct made as per
specification BSEN - 500 86/IS 14930 Part-II. Makes:DURA
LINE (Dura Guard) or its equivalent make.

103 4.9 CABLE TRAYS


104 ELEC-4.9.1 Supply and Installation of 600mm x 75mm x 2mm thick hot dip 1 Mtr
GI perforated cable tray with cover along with required angle
supports, with coupler plates, Anchor bolts and nuts etc
complete and the tray should be fitted on the wall / Ceiling
etc. complete.

105 ELEC-4.9.2 Supply and Installation of 600mm x 50mm x 2mm thick GI 1 Mtr
perforated cable tray with cover along with required angle
supports, with coupler plates, Anchor bolts and nuts etc
complete and the tray should be fitted on the wall / Ceiling
etc. complete.

106 ELEC-4.9.3 Supply and Installation of 450mm x 50mm x 2mm thick GI 1 Mtr
perforated cable tray with cover along with required angle
supports, with coupler plates, Anchor bolts and nuts etc
complete and the tray should be fitted on the wall / Ceiling
etc. complete.
107 ELEC-4.9.4 Supply and Installation of 300mm x 50mm x 2mm thick GI 1 Mtr
perforated cable tray with cover along with required angle
supports, with coupler plates, Anchor bolts and nuts etc
complete and the tray should be fitted on the wall / Ceiling
etc. complete.

108 ELEC-4.9.5 Supply and Installation of 150mm x 50mm x 2mm thick 1 Mtr
GI perforated cable tray with cover along with required
angle supports, with coupler plates, Anchor bolts and
nuts etc complete and the tray should be fitted on the
wall / Ceiling etc. complete.
109 ELEC-4.9.6 Supply and Installation of 150mm x 50mm x 2mm 1 Mtr
thick GI Ladder type cable tray along with required
angle supports, with coupler plates, Anchor bolts and
nuts etc complete and the tray should be fitted on the
wall / Ceiling etc. complete.
110 ELEC-4.9.7 Supply and Installation of 300mm x 50mm x 2mm thick 1 Mtr
GI Ladder type cable tray along with required angle
supports, with coupler plates, Anchor bolts and nuts etc
complete and the tray should be fitted on the wall / Ceiling
etc. complete.
111 ELEC-4.9.8 Supply and Installation of 600mm x 75mm x 2mm 1 Mtr
thick GI Ladder type cable tray along with required
angle supports, with coupler plates, Anchor bolts and
nuts etc complete and the tray should be fitted on the
wall / Ceiling etc. complete.
112 Note: Perforated cable trays provided without cover 30%
may be deducted from above rates.

113 SECTION - 5
114 5.1 FANS
115 ELEC-5.1.1 Supply of 48" (1200mm) Sweep ISI mark Ceiling Fan as per 1 No
IS 374 - 1979 and, with double ball bearings but without
Regulator of makes Crompton / Bajaj Kassels 50 / Usha
atom

116 ELEC-5.1.2 Supply of 48" (1200mm) Sweep 5 Star rated Ceiling Fan 1 No
without Regulator of makes Crompton High Speed Decora /
Bajaj Regal star / Havells Fusion 50 / Orient Summer Crown /
Usha technix decorative

117 ELEC-5.1.3 Supply of 56" (1400mm) Sweep ISI mark Ceiling Fan as per 1 No
IS 374 - 1979 and, with double ball bearings but without
Regulator of makes Crompton / Bajaj Kassels 50 / Usha atom

118 ELEC-5.1.4 Supply of 56" (1400mm) Sweep 4/5 Star rated Ceiling Fan 1 No
without Regulator of makes Crompton / Bajaj Elegance Star /
Usha / Havells.

119 ELEC-5.1.5 Supply of 16" (400mm) Wall mounted Fan of makes 1 No


Crompton SDX Gold / Bajaj Elite / Havells Swing Premia
gold / Usha / Orient Wall 43.

120 ELEC-5.1.6 Supply of 16" (400mm) Pedestal Fan of makes Crompton 1 No


SDX Gold / Bajaj Spectrum / Havells Swing Remote / Usha /
Orient.
121 ELEC-5.1.7 Supply of 18" (450mm) Wall mounting / Pedestal Air 1 No
Circulators of makes Crompton / Havells Turbo Force /
Orient / Almounard.

122 ELEC-5.1.8 Supply of 24" (600mm) Wall mounting / Pedestal Air 1 No


Circulators of makes Crompton / Havells Turbo Force /
Almounard.

123 ELEC-5.1.9 Supply of 12" (300mm) Cabin fan of makes Crompton / 1 No


Havells ciera / Orient AP12.

124 ELEC-5.1.10 Supply of 12" (300mm) Light duty exhaust fan with wire guard 1 No
etc complete of makes Crompton / Bajaj Bahar WG / Havells
Ventil Air-DB / Orient hill air.

125 ELEC-5.1.11 Supply of 9" (225mm), Light duty exhaust fan with double ball 1 No
bearing and wire guard etc complete of makes Crompton /
Bajaj Bahar WG / Havells Ventil Air-DS / Orient hill air.

126 ELEC-5.1.12 Supply of 12" (300mm) ISI, 900 RPM Heavy duty exhaust fan 1 No
with metallic blades with Mark of makes Crompton /
Almounard / Havells Turbo Force.

127 ELEC-5.1.13 Supply of 15" (375mm) ISI, 900 RPM Heavy duty exhaust fan 1 No
with metallic blades with Mark of makes Crompton /
Almounard / Havells Turbo Force

128 ELEC-5.1.14 Supply of 18" (450mm) ISI, 900 RPM Heavy duty exhaust fan 1 No
with metallic blades with Mark of makes Crompton /
Almounard / Havells Turbo Force

129 5.2 WATER HEATERS


130 ELEC-5.2.1 Supply, Transportation and fixing of storage / Pressure type 1 No
Vertical / Horizontal 230/250V single phase 2000watts ISI
mark 5 Star rated water heater with SS tank and ABS plastic
body of 15 Ltrs capacity to withstand up to 6.5 bar of water
pressure including all standard accessories and dead weight
pressure reducing valve on out let side, including cost of 2
Nos nylon / PVC / Metallic hose pipe, testing and all labour
charges etc., complete. Makes:makes Crompton model No.
solarium plus SWH 725, Class 1 rated or its equivalent make
of Bajaj / Venus / Racold / Usha.

131 ELEC-5.2.2 Supply, Transportation and fixing of storage / Pressure type 1 No


Vertical / Horizontal 230/250V single phase 2000watts ISI
mark 5 Star rated water heater with SS tank and ABS plastic
body of 25 Ltrs capacity to withstand up to 6.5 bar of water
pressure including all standard accessories and dead weight
pressure reducing valve on out let side, including cost of 2
Nos nylon / PVC / Metallic hose pipe, testing and all labour
charges etc., complete. Makes:makes Crompton model No.
solarium plus SWH 725, Class 1 rated or its equivalent make
of Bajaj / Venus / Racold / Usha.

132 5.3 ACCESSORIES FOR WATER HEATERS


133 ELEC-5.3.1 Heating element of 1.5 / 2.0 / 3.0 KW. 1 No

134 ELEC-5.3.2 Supply of thermostat with range 300 to 900C.Adjustable and 1 No


suitable for 25 to 50 Ltrs. Capacity.

135 ELEC-5.3.3 Supply of pressure release valve for water heater of 15 to 50 1 No


Ltrs.capacity.

136 ELEC-5.3.4 Flexible Nylon / PVC Metallic hose pipe 1 No

137 5.4 ACCESSORIES FOR MOTORS


138 ELEC-5.4.1 Supply & Fixing of D.O.L Starter 250V, Single phase, 50Hz. 1 No
With SS enclouser comprising of contactor with bi-metalic
relay with necessary push buttons, etc.,
complete.Makes:Siemens / Crompton / L&T.

139 ELEC-5.4.2 Supply & Fixing of D.O.L Starter 415V, 3 phase, 50Hz.. 1 No
enclosed with no volt coil and overload protection with
necessary materials, etc., complete suitableupto
7.5.HP.Makes:Siemens / Crompton / L&T.

140 ELEC-5.4.3 Supply & Fixing of D.O.L Starter 415V, 3 phase, 50Hz.. 1 No
enclosed with no volt coil, overload protection and single
phase preventor , etc., complete suitable upto 10.0.HP.
Makes:Siemens / Crompton / L&T.

141 5.5 SINGLE PHASE SUBMERSIBLE MOTOR PUMP SETS


142 ELEC-5.5.1 Supply and Transportation of 0.75HP 8 1 No
Stage single phase ISI submersible motor
pumpset suitable for 4" Bore well.
Makes: Kirloskar / Crompton / Texmo / CRI
/ KSB / Aryan Varsha
143 ELEC-5.5.2 Supply and Transportation of 0.75HP 8 1 No
Stage single phase ISI submersible motor
pumpset suitable for 4" Bore well.
Makes: Varuna / Flowell / Waterman /
Techno / Mahavir / Unitech / Fitwell / Lubi /
Falcon / Sterling

144 ELEC-5.5.3 Supply and Transportation of 1.00HP 10 1 No


Stage single phase ISI submersible motor
pumpset suitable for 4" Bore well.
Makes: Kirloskar / Crompton / Texmo / CRI
/ KSB / Aryan Varsha
145 ELEC-5.5.4 Supply and Transportation of 1.00HP 10 1 No
Stage single phase ISI submersible motor
pumpset suitable for 4" Bore well.
Makes: Varuna / Flowell / Waterman /
Techno / Mahavir / Unitech / Fitwell / Lubi /
Falcon / Sterling

146 ELEC-5.5.5 Supply and Transportation of 1.00HP 15 1 No


Stage single phase ISI submersible motor
pumpset suitable for 4" Bore well.
Makes: Kirloskar / Crompton / Texmo / CRI
/ KSB / Aryan Varsha
147 ELEC-5.5.6 Supply and Transportation of 1.00HP 15 1 No
Stage single phase ISI submersible motor
pumpset suitable for 4" Bore well.
Makes: Varuna / Flowell / Waterman /
Techno / Mahavir / Unitech / Fitwell / Lubi /
Falcon / Sterling.

148 ELEC-5.5.7 Supply and Transportation of 1.50HP 21 1 No


Stage single phase ISI submersible motor
pumpset suitable for 4" Bore well.
Makes: Kirloskar / Crompton / Texmo / CRI
/ KSB / Aryan Varsha
149 ELEC-5.5.8 Supply and Transportation of 1.50HP 21 1 No
Stage single phase ISI submersible motor
pumpset suitable for 4" Bore well.
Makes: Varuna / Flowell / Waterman /
Techno / Mahavir / Unitech / Fitwell / Lubi /
Falcon / Sterling.

150 ELEC-5.5.9 Supply and Transportation of 2.00HP 25 1 No


Stage single phase ISI submersible motor
pumpset suitable for 4" Bore well.
Makes: Kirloskar / Crompton / Texmo / CRI
/ KSB / Aryan Varsha
151 ELEC-5.5.10 Supply and Transportation of 2.00HP 25 1 No
Stage single phase ISI submersible motor
pumpset suitable for 4" Bore well.
Makes: Varuna / Flowell / Waterman /
Techno / Mahavir / Unitech / Fitwell / Lubi /
Falcon / Sterling.

152 5.6 THREE PHASE SUBMERSIBLE MOTOR PUMP SETS.


153 ELEC-5.6.1 Supply and Transportation of 3.00HP Star rated 5-10 Stage 1 No
Three phase ISI submersible motor pumpset suitable for 6"
Bore well. Makes: Kirloskar / Crompton / Texmo / CRI
/ KSB / Aryan Varsha

154 ELEC-5.6.2 Supply and Transportation of 3.00HP Star rated 5-10 Stage 1 No
Three phase ISI submersible motor pumpset suitable for 6"
Bore well.Makes: Varuna / Flowell / Waterman / Techno /
Mahavir / Unitech / Fitwell / Lubi / Falcon / Sterling

155 ELEC-5.6.3 Supply and Transportation of 5.00HP Star rated 5-10 Stage 1 No
Three phase ISI submersible motor pumpset suitable for 6"
Bore well. Makes: Kirloskar / Crompton / Texmo / CRI
/ KSB / Aryan Varsha

156 ELEC-5.6.4 Supply and Transportation of 5.00HP Star rated 5-10 Stage 1 No
Three phase ISI submersible motor pumpset suitable for 6"
Bore well.Makes: Varuna / Flowell / Waterman / Techno /
Mahavir / Unitech / Fitwell / Lubi / Falcon / Sterling

157 ELEC-5.6.5 Supply and Transportation of 5.00HP Star rated 12-16 Stage 1 No
Three phase ISI submersible motor pumpset suitable for 6"
Bore well. Makes: Kirloskar / Crompton / Texmo / CRI
/ KSB / Aryan Varsha
158 ELEC-5.6.6 Supply and Transportation of 5.00HP Star rated 12-16 Stage 1 No
Three phase ISI submersible motor pumpset suitable for 6"
Bore well.Makes: Varuna / Flowell / Waterman / Techno /
Mahavir / Unitech / Fitwell / Lubi / Falcon / Sterling

159 ELEC-5.6.7 Supply and Transportation of 7.5.00HP Star rated 5-10 Stage 1 No
Three phase ISI submersible motor pumpset suitable for 6"
Bore well. Makes: Kirloskar / Crompton / Texmo / CRI
/ KSB / Aryan Varsha

160 ELEC-5.6.8 Supply and Transportation of 7.5.00HP Star rated 5-10 Stage 1 No
Three phase ISI submersible motor pumpset suitable for 6"
Bore well.Makes: Varuna / Flowell / Waterman / Techno /
Mahavir / Unitech / Fitwell / Lubi / Falcon / Sterling

161 ELEC-5.6.9 Supply and Transportation of 7.5.00HP Star rated 12-16 1 No


Stage Three phase ISI submersible motor pumpset suitable
for 6"
Bore well. Makes: Kirloskar / Crompton / Texmo / CRI
/ KSB / Aryan Varsha

162 ELEC-5.6.10 Supply and Transportation of 7.5.00HP Star rated 12-16 1 No


Stage Three phase ISI submersible motor pumpset suitable
for 6"
Bore well.Makes: Varuna / Flowell / Waterman / Techno /
Mahavir / Unitech / Fitwell / Lubi / Falcon / Sterling

163 ELEC-5.6.11 Supply and Transportation of 7.5.00HP Star rated 20-24 1 No


Stage Three phase ISI submersible motor pumpset suitable
for 6"
Bore well.Makes: Varuna / Flowell / Waterman / Techno /
Mahavir / Unitech / Fitwell / Lubi / Falcon / Sterling

164 ELEC-5.6.12 Supply and Transportation of 7.5.00HP Star rated 20-24 1 No


Stage Three phase ISI submersible motor pumpset suitable
for 6"
Bore well. Makes: Kirloskar / Crompton / Texmo / CRI
/ KSB / Aryan Varsha

165 ELEC-5.6.13 Supply and Transportation of 10.00HP Star rated 5-10 Stage 1 No
Three phase ISI submersible motor pumpset suitable for 6"
Bore well. Makes: Kirloskar / Crompton / Texmo / CRI
/ KSB / Aryan Varsha

166 ELEC-5.6.14 Supply and Transportation of 10.00HP Star rated 5-10 Stage 1 No
Three phase ISI submersible motor pumpset suitable for 6"
Bore well.Makes: Varuna / Flowell / Waterman / Techno /
Mahavir / Unitech / Fitwell / Lubi / Falcon / Sterling
167 ELEC-5.6.15 Supply and Transportation of10.00HP Star rated 12-16 Stage 1 No
Three phase ISI submersible motor pumpset suitable for 6"
Bore well. Makes: Kirloskar / Crompton / Texmo / CRI
/ KSB / Aryan Varsha

168 ELEC-5.6.16 Supply and Transportation of 10.00HP Star rated 12-16 Stage
Three phase ISI submersible motor pumpset suitable for 6"
Bore well.Makes: Varuna / Flowell / Waterman / Techno /
Mahavir / Unitech / Fitwell / Lubi / Falcon / Sterling

169 ELEC-5.6.17 Supply and Transportation of 10.00HP Star rated 20-24 Stage
Three phase ISI submersible motor pumpset suitable for 6"
Bore well.Makes: Varuna / Flowell / Waterman / Techno /
Mahavir / Unitech / Fitwell / Lubi / Falcon / Sterling

170 ELEC-5.6.18 Supply and Transportation of 10.00HP Star rated 20-24 Stage
Three phase ISI submersible motor pumpset suitable for 6"
Bore well. Makes: Kirloskar / Crompton / Texmo / CRI
/ KSB / Aryan Varsha

171 ELEC-5.6.19 Supply and Transportation of 12.50HP Star rated 8-12 Stage
Three phase ISI submersible motor pumpset suitable for 6"
Bore well. Makes: Kirloskar / Crompton / Texmo / CRI
/ KSB / Aryan Varsha

172 ELEC-5.6.20 Supply and Transportation of 12.5.00HP Star rated 8-12


Stage Three phase ISI submersible motor pumpset suitable
for 6"
Bore well.Makes: Varuna / Flowell / Waterman / Techno /
Mahavir / Unitech / Fitwell / Lubi / Falcon / Sterling
173 ELEC-5.6.21 Supply and Transportation of12.50HP Star rated 12-16 Stage
Three phase ISI submersible motor pumpset suitable for 6"
Bore well. Makes: Kirloskar / Crompton / Texmo / CRI
/ KSB / Aryan Varsha

174 ELEC-5.6.22 Supply and Transportation of 12.50HP Star rated 12-16 Stage
Three phase ISI submersible motor pumpset suitable for 6"
Bore well.Makes: Varuna / Flowell / Waterman / Techno /
Mahavir / Unitech / Fitwell / Lubi / Falcon / Sterling

175 ELEC-5.6.23 Supply and Transportation of 15.00HP Star rated 8-12 Stage
Three phase ISI submersible motor pumpset suitable for 6"
Bore well. Makes: Kirloskar / Crompton / Texmo / CRI
/ KSB / Aryan Varsha

176 ELEC-5.6.24 Supply and Transportation of 15.00HP Star rated 8-12 Stage
Three phase ISI submersible motor pumpset suitable for 6"
Bore well.Makes: Varuna / Flowell / Waterman / Techno /
Mahavir / Unitech / Fitwell / Lubi / Falcon / Sterling

177 ELEC-5.6.25 Supply and Transportation of 12.50HP Star rated 16 -24


Stage Three phase ISI submersible motor pumpset suitable
for 6"
Bore well.Makes: Varuna / Flowell / Waterman / Techno /
Mahavir / Unitech / Fitwell / Lubi / Falcon / Sterling
178 ELEC-5.6.26 Supply and Transportation of 12.50HP Star rated 16 - 24
Stage Three phase ISI submersible motor pumpset suitable
for 6"
Bore well. Makes: Kirloskar / Crompton / Texmo / CRI
/ KSB / Aryan Varsha

179 5.7 SINGLE PHASE OPEN WELL SUBMERSIBLE MOTOR


PUMP SETS.
180 ELEC-5.7.1 Supply and Transportation of 1.00HP Single phase open well 1 No
ISI submersible motor pumpset. Makes: Kirloskar /
Crompton / CRI / L&T / Texmo / Varsha.

181 ELEC-5.7.2 Supply and Transportation of 1.00HP Single phase open well 1 No
ISI submersible motor pumpset. Makes: Kirloskar /
Crompton / CRI / L&T / Texmo / Varsha.

182 ELEC-5.7.3 Supply and Transportation of 1.50HP Single phase open well 1 No
ISI submersible motor pumpset. Makes: Kirloskar /
Crompton / CRI / L&T / Texmo / Varsha.

183 ELEC-5.7.4 Supply and Transportation of 1.50HP Single phase open well 1 No
ISI submersible motor pumpset. Makes: Kirloskar /
Crompton / CRI / L&T / Texmo / Varsha.

184 ELEC-5.7.5 Supply and Transportation of 3.00HP Single phase open well 1 No
ISI submersible motor pumpset. Makes: Kirloskar /
Crompton / CRI / L&T / Texmo / Varsha.

185 ELEC-5.7.6 Supply and Transportation of 3.00HP Single phase open well 1 No
ISI submersible motor pumpset. Makes: Kirloskar /
Crompton / CRI / L&T / Texmo / Varsha.

186 5.8 THREE PHASE OPEN WELL SUBMERSIBLE PUMP SETS.

187 ELEC-5.8.1 Supply and Transportation of 3.00HP Three phase open well 1 No
ISI submersible motor pumpset.(65x50) Makes:
Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.

188 ELEC-5.8.2 Supply and Transportation of 3.00HP Three phase open well
ISI submersible motor pumpset.(65x50) Makes:
Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.

189 ELEC-5.8.3 Supply and Transportation of 5.00HP Three phase open well 1 No
ISI submersible motor pumpset.(75x65) Makes:
Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.

190 ELEC-5.8.4 Supply and Transportation of 5.00HP Three phase open well
ISI submersible motor pumpset.(75x65) Makes:
Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.

191 ELEC-5.8.5 Supply and Transportation of 7.50HP Three phase open well 1 No
ISI submersible motor pumpset.(100x75) Makes:
Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.
192 ELEC-5.8.6 Supply and Transportation of 7.50HP Three phase open well
ISI submersible motor pumpset.(100x75) Makes:
Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.

193 ELEC-5.8.7 Supply and Transportation of 10.00HP Three phase open 1 No


well ISI submersible motor pumpset.(100x75) Makes:
Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.

194 ELEC-5.8.8 Supply and Transportation of 10.00HP Three phase open


well ISI submersible motor pumpset.(100x75) Makes:
Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.

195 5.9 SINGLE PHASE MONO BLOCK MOTOR PUMP SETS.


196 ELEC-5.9.1 Supply and Transportation of 0.5HP Single phase, 2880 RPM 1 No
50 Hz ISI Mono block CI body motor pumpset (25x25mm).
Makes: Kirloskar / Crompton / Texmo / CRI / KSB / Aryan
Varsha
Makes: Kirloskar / Crompton / Texmo / CRI / KSB / Aryan
Varsha

197 ELEC-5.9.2 Supply and Transportation of 0.5HP Single phase ISI Mono
block motor pumpset (25x25mm). Makes: Kirloskar /
Crompton / CRI / L&T / Texmo / Varsha.

198 ELEC-5.9.1 Supply and Transportation of 1.0HP Single phase ISI Mono 1 No
block motor pumpset (25x25mm). Makes: Kirloskar /
Crompton / CRI / L&T / Texmo / Varsha.

199 ELEC-5.9.1 Supply and Transportation of 1.0HP Single phase ISI Mono 1 No
block motor pumpset (25x25mm). Makes: Kirloskar /
Crompton / CRI / L&T / Texmo / Varsha.

200 ELEC-5.9.1 Supply and Transportation of 1.5HP Single phase ISI Mono 1 No
block motor pumpset (32x25mm). Makes: Kirloskar /
Crompton / CRI / L&T / Texmo / Varsha.

201 ELEC-5.9.1 Supply and Transportation of 1.5HP Single phase ISI Mono 1 No
block motor pumpset (32x25mm). Makes: Aryan varsha /
Flowell/ Waterman
202 ELEC-5.9.1 Supply and Transportation of 1.02HP Single phase ISI self 1 No
priming Mono block IP44 motor pumpset (40x40mm).
Makes: Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.

203 ELEC-5.9.1 Supply and Transportation of 1.02HP Single phase ISI self 1 No
priming Mono block IP44 motor pumpset (40x40mm).
Makes: Aryan varsha / Flowell/ Waterman
204 ELEC-5.9.1 Supply and Transportation of 2.00HP Three phase ISI self 1 No
priming Mono block IP44 motor pumpset (40x40mm).
Makes: Kirloskar / Crompton / CRI / Texmo / CRL / KSB

205 ELEC-5.9.1 Supply and Transportation of 2.00HP Three phase ISI self 1 No
priming Mono block IP44 motor pumpset (40x40mm).
Makes: Aryan varsha / Flowell/ Waterman
206 ELEC-5.9.1 Supply and Transportation of 3.00HP Three phase ISI self 1 No
priming Mono block IP44 motor pumpset (50x50mm). Makes:
Kirloskar / Crompton / CRI / Texmo / CRL / KSB
207 ELEC-5.9.1 Supply and Transportation of 3.00HP Three phase ISI self 1 No
priming Mono block IP44 motor pumpset (50x50mm). Makes:
Aryan varsha / Flowell/ Waterman
208 ELEC-5.9.1 Supply and Transportation of 5.00HP Three phase ISI self
priming Mono block IP44 motor pumpset (80x80mm).
Makes: Kirloskar / Crompton / CRI / Texmo / CRL / KSB
209 ELEC-5.9.1 Supply and Transportation of 5.00HP Three phase ISI self 1 No
priming Mono block IP44 motor pumpset (80x80mm).
Makes:Aryan varsha / Flowell/ Waterman

210 5.10 CONTROL PANEL BOARD FOR MOTORS


211 ELEC - 5.10.1 Supply and Transportation of control panel for single phase 1 No
submersible motors up to 3 HP @ 220V 50Hz operating range
between 80 to 240V including supply and fixing of Direct - on -
Line LTLK / SIEMENS / CROMPTON make Volt meter and
Ammeter with starting and running capacitors assembled with
ISI mark contactors and fitted with Legrand make ISI mark
MCB etc., complete.

212 5.11 REPAIRS TO MOTORS AND REWINDING, BEARINGS


ELEC-5.11.1 Bearing of approved make for electric motor
single phase / 3 phase AC upto 1 HP of all
types.
ELEC-5.11.2 Bearing of approved make for electric motor
single phase / 3 phase AC upto 2 to 3 HP
of all types
ELEC-5.11.3 Bearing of approved make for electric motor
single phase / 3 phase AC upto 5 to 7.5 HP
of all types
ELEC-5.11.4 Bearing of approved make for electric motor
single phase / 3 phase AC upto 10 to 12.5
HP of all types
ELEC-5.11.5 Bearing of approved make for electic motor
single phase / 3 phase AC upto 15 to 20
HP of all types.
ELEC-5.11.6 Bearing of table / cabin / pedestal / ceiling /
exhaust fan complete with alignment of
shaft and tested
ELEC-5.11.7 Bearing of bush / rubber / ring washers
complete with alignment of shaft and
tested
ELEC-5.11.8 Capacitor of table / cabin / pedestal / ceiling
/ exhaust fan complete.
ELEC-5.11.9 EICHER model 11:10 with 100 H.P. direct
injestion 4 stroke engine with one spare
wheel 3800 mm cabin high deck with jangla
(full body) (4 wheeler) for generator
5.12 ACCESSORIES OF MOTORS
ELEC-5.12.1 Supply, Transportation and fixing of suitable
pump guard set (2Nos SS), Flanges set (2
Nos) to protect and safe guard the pump
and Motor from vibrations while starting and
switching of the pumpset.
ELEC-5.12.1a OD 42mm
ELEC-5.12.1b OD 48mm
ELEC-5.12.1c OD 60mm
ELEC-5.12.1d OD 75mm
ELEC-5.12.1e OD 80mm
ELEC-5.12.2 Supply, Transportation and fixing of
seamless cast iron adopter assembly (Two
Nos at bottom of the pipe to coupling to the
pump set and the other at top end of the
pipes) for installing the pump set with pipes
including cost and conveyance of all
materials, taxes etc., complete

ELEC-5.12.2a OD 42mm
ELEC-5.12.2b OD 48mm
ELEC-5.12.2c OD 60mm
ELEC-5.12.2d OD 75mm
ELEC-5.12.2e OD 80mm
ELEC-5.12.3 Supply, Transportation and fixing of
following galvanised GI bends heavy duty
with threaded at both ends for installing the
pump set including cost and conveyance of
all materials, taxes etc., complete
ELEC-5.12.3a 50mm dia 90 degree bend with length of
20cm (Center to face)
ELEC-5.12.3b 65mm dia 90 degree bend with length of
20cm (Center to face)
ELEC-5.12.3c 80mm dia 90 degree bend with length of
20cm (Center to face)
ELEC-5.12.4 Supply, Transportation and fixing of
following MS threaded Flanges 2 Nos with
nuts and bolts including cost and
conveyance of all materials, taxes etc.,
complete
ELEC-5.12.4a 50mm dia MS flanges set (2 Nos) 150mm
dia OD, 12mm thick each flange with
required dia bolts and nuts
ELEC-5.12.4b 65mm dia MS flanges set (2 Nos) 165mm
dia OD, 12mm thick each flange with
required dia bolts and nuts
ELEC-5.12.4c 80mm dia MS flanges set (2 Nos) 175mm
dia OD, 12mm thick each flange with
required dia bolts and nuts
ELEC-5.12.5 Supply, Transportation and fixing of MS
Clamp set with nuts and bolts.
ELEC-5.12.5a 50mm dia, 450mm length, 12mm thickness
and 75mm wide with required nuts and
bolts.
ELEC-5.12.5b 65mm dia, 450mm length, 12mm thickness
and 75mm wide with required nuts and
bolts.
ELEC-5.12.5c 80mm dia, 450mm length, 12mm thickness
and 75mm wide with required nuts and
bolts
ELEC-5.12.5d 150mm dia galvanised bore cover with bolts
and nuts.
ELEC-5.12.5e 150mm dia stainless steel bore cover with
bolts and nuts

247 6.1 AIR CONDITIONERS


248 ELEC-6.1.1 Supply of split AC unit with high wall mounted indoor unit and
outdoor condencing unit Hermetically sealed compressor
suitable for operation on 230V, 50Hz, 1Phase AC supply
capable of performing cooling dehumidifying air
circulating and filtering with cooling and condensing units
with 5mts of required size of copper piping duly insulated
and 3 core copper flexible chord of required length and
cordless remote control

1.5 TR Split ACs


249 ELEC-6.1.1a 1.5 TR 3 Star capable of delivering 18000 BTU/hr and 1 No
above with operating on refrigerant R-22 makes
Mitsubishi SRK 19 CK-6
250 ELEC-6.1.1b 1.5 TR 3 Star capable of delivering 18000 BTU/hr and 1 No
above with operating on refrigerant R-22 makes Daikin
FTE-M or N Sereis / Carrier Novello / Blue Star 3HW18VB1
/ Hitachi (Kazi+) / Voltas 183 PX-R.
251 ELEC-6.1.1c 1.5TR 5 Star capable of delivering 18000 BTU/hr and 1 No
above with operating on refrigerant R-22 makes Mitsubishi
SRK20CKS-6 / Hitachi ACE FMS
252 ELEC-6.1.1d 1.5TR 5 Star capable of delivering 18000 BTU/hr and 1 No
above with operating on refrigerant R-410A makes
Daikin FT-M / Carrier Estrella / Blue Star 5HW18DBF1.

253 1.8TR-2.1TR Split ACs


254 ELEC-6.1.1e 1.8 / 2.0 TR 3 Star capable of delivering 21600 BTU/hr and 1 No
above with operating on refrigerant R-22 makes Carrier Dura
edgeplus / Daikin FTE-M or N Series / Blue Star
3HW24SVB1
255 ELEC-6.1.1f 2.0 TR 4 Star capable of delivering 21600 BTU/hr and 1 No
above with operating on refrigerant R-22 makes 'O' General.

256 ELEC-6.1.1g 2.0 TR 4 Star capable of delivering 21600 BTU/hr and 1 No


above with operating on refrigerant R-22 makes Carrier
Kurve.
257 ELEC-6.1.1h 1.8 / 2.0 TR 5 Star capable of delivering 21600 BTU/hr 1 No
and above with operating on refrigerant R-22 makes
Mitsubishi SRK25CKS-6 / Daikin FT-M Series
258 6.2 Inverter Split AC Unts (Cooling Only)
259 ELEC-6.2.1 Supply of INVERTER Model Cool type split AC unit with
high wall mounted Single Split indoor unit and outdoor
condencing unit Hermetically sealed compressor suitable for
operation on 230V, 50Hz, 1Phase AC supply capable of
performing Heat cool dehumidi -fying air circulating and
filtering with cooling and condensing units duly insulated
and 3 core copper flexible chord of required length
etc. complete including cordless remote

260 ELEC-6.2.1a 1.5 TR capable of delivering 18000 BTU/hr and above 1 No


with operating on refrigerant R-410 makes O General
model No. ASGA18JCC / Toshibha Model No. RAS-
18N3KCV-IN
261 ELEC-6.2.1b 1.5 TR capable of delivering 18000 BTU/hr and above 1 No
with operating on refrigerant R-410 makes 'Daikin Model
No.FTKS50FVMA / Mitsubishi Model No. SRK18YL-S / Blue
Star Model No. HNHW18CBF.
262 ELEC-6.2.1c 1.8 TR capable of delivering 21600 BTU/hr and above 1 No
with operating on refrigerant R-410 makes Thosibha
Model No. RAS-22N3KCV-IN / Daikin Model No.
FTKS60FVMA
263 ELEC-6.2.1d 2.0 TR capable of delivering 24000 BTU/hr and above 1 No
with operating on refrigerant R-410 makes 'O' General
Model No. ASGA24JCC / Blue Star Model No. HNHW22CBF

264 6.3 CASSETTE TYPE AC UNITS


265 ELEC-6.3.1.a. Supply of Cassette type AC unit with ceiling mounted
indoor unit and outdoor condencing unit Hermetically
sealed compressor suitable for operation on AC supply
capable of performing cooling dehumidifying air circulating
and filtering with cooling and condensing units etc
complete with Wireless remote controller, but without
refrigerent piping and cable.

266 ELEC-6.3.1.a. Single Phase R-22 Makes: 2.2TR Daikin / 2.0TR 'O' Genral 1 No
AUG25AB
267 ELEC-6.3.1.b 3.0TR Three Phase capable of delivering 36000 BTU/hr 1 No
and above with operating on refrigerant R-22 makes
Makes: 'O' Genral
268 ELEC-6.3.1.c 3.5TR Three Phase capable of delivering 42000 BTU/hr 1 No
and above with operating on refrigerant R-22 Makes: 'O'
General
269 ELEC-6.3.1.d 3.3TR Three Phase capable of delivering 42000 BTU/hr 1 No
and above with operating on refrigerant R-22 Makes: Daikin

270 ELEC-6.3.1.e 3.5TR Three Phase Makes: Carrier / Blue Star 1 No

271 ELEC-6.3.1.f 4.1TR Three Phase capable of delivering 48000 BTU/hr and 1 No
above with operating on refrigerant R-22 Makes: Daikin / 'O'
Genral
272 ELEC-6.3.1.g 4.0TR Three Phase capable of delivering 48000 BTU/hr and 1 No
above with operating on refrigerant R-22 Makes: Carrier /
Blue Star
273 ELEC-6.3.1.h 3.0TR Three Phase capable of delivering 36000 BTU/hr and 1 No
above with operating on refrigerant R-410 Makes:Carrier /
Blue Star.
274 ELEC-6.3.1.i 3.0TR Three Phase capable of delivering 36000 BTU/hr and 1 No
above with operating on refrigerant R-410 Makes:Toshibha /
O General (Inverter Technology)

275 ELEC-6.3.1.j 4.0TR Three Phase capable of delivering 48000 BTU/hr and 1 No
above with operating on refrigerant R-410 Makes: Carrier /
Blue Star

276 ELEC-6.3.1.k 4.0TR Three Phase capable of delivering 48000 BTU/hr and 1 No
above with operating on refrigerant R-410 Makes:Toshibha /
O General (Inverter Technology)
#REF! 6.4 TOWER MODEL TYPE AC UNITS
#REF! ELEC-6.4.1 Supply of Slim line / Tower Model/Verticool type split AC
unit with indoor unit and floor mounted outdoor
condencing unit Hermetically sealed Scroll compressor
suitable for operation on AC supply capable of performing
cooling dehumidifying air circulating and filtering with
cooling and condensing units etc complete with cordless
remote control
#REF! ELEC-6.4.1.a 3.0TR Three Phase capable of delivering 36000 BTU/hr and 1 No
above with operating on refrigerant R-22 Makes: Voltas

#REF! ELEC-6.4.1.b 3.5TR Three Phase capable of delivering 42000 BTU/hr and 1 No
above with operating on refrigerant R-22 Makes: Blue Star

#REF! 6.5 INVERTOR MODEL HEAT COOL SINGLE SPLIT AC'S

#REF! ELEC-6.5.1 Supply of INVERTER Model Heat Cool type split AC unit
with high wall mounted Single Split indoor unit and
outdoor condencing unit Hermetically sealed compressor
suitable for operation on 230V, 50Hz, 1Phase AC supply
capable of performing Heat cool dehumidi -fying air circulating
and filtering with cooling and condensing units duly insulated
and 3 core copper flexible chord of required length etc.
complete.

#REF! ELEC-6.5.2 ......do....with Cooling capacity 18000 BTU/Hr and above,


Coffeient of performance 3.70 and above and R410A
refrigerent etc complete. Make : Toshiba model No. Indoor
Unit RAS-18N3KV2-E Outdoor Unit RAS-18N3AV2-E or its
equivalent model of 'O'General / Mitsubishi / Daikin

6.6 REPAIRS TO AIR CONDITIONERS


213 ELEC-6.6.1 Supply, Fabrication of 1set MS bracket suitable for fixing out 1 Set
door unit of split AC unit.

214 ELEC-6.6.2 Providing 2 runs of Copper tubes for suction and discharge 1 Mtr
between indoor and outdoor unit for split Air-Conditioner
including foaming etc., complete.

215 ELEC-6.6.3 Supply of 1.0 / 1.5 Ton brand new Rotary type sealed 1 No
compressor.

216 ELEC-6.6.4 Supply of 2.0 Ton brand new Rotary type sealed 1 No
compressor.

217 ELEC-6.6.5 Multi speed Fan Motor suitable for 1.0 / 1.5 / 2.0 Ton 1 No
Window A.C.Unit of makes Crompton / AU.

218 ELEC-6.6.6 Fan motor capacitor 6 mfd by new capacitor for A.C 1 No
machine of 1.0 1.5 / Ton Capacity.

219 ELEC-6.6.7 Thermostat switch suitable for 1.0 / 1.5 / 2.0 Ton A.C.Unit. 1 No

220 ELEC-6.6.8 Starting capacitor of 80 to 120 mfd. by new approved make 1 No


capacitor suitable for compressor motor of 1.0 / 1.5 Ton A.C.
Unit.

221 ELEC-6.6.9 Running capacitor of 36 mfd by new approved make capacitor 1 No


suitable for compressor motor of 1.0 / 1.5 Ton A.C.Unit.
222 ELEC-6.6.10 Relay by approved make having pickup voltage 220 Volts and 1 No
dropout voltage 120 Volts suitable for 1.0 / 1.50 Ton A.C. Unit.

223 ELEC-6.6.11 Filter and capillary tube including welding etc., complete for 1 No
1.0 / 1.5 / 2.0 Ton A.C.Unit.

224 ELEC-6.6.12 Air filter suitable for 1.50 Ton Window A.C.Unit P.V.C./ 1 No
NYLON.

225 ELEC-6.6.13 Air filter suitable for 1.50 Ton Split A.C.Unit P.V.C. / NYLON. 1 No

226 ELEC-6.6.14 Rewiring the entire Window type 1.50 Ton A.C.unit with 2.5 1 No
Sq.mm Flexible copper cable and putting the same in
working conditions.

227 ELEC-6.6.15 Overhauling and servicing the Window type 1.0 / 1.5 Ton A.C. 1 No
Machine by Cleaning the condensor cooling Coil etc., by
blower and oiling the Fan Motor and Cleaning all parts and
putting the machine in working condition.

228 ELEC-6.6.16 Fan blade for 1.0 / 1.5 Ton A.C.Machine. 1 No

229 ELEC-6.6.17 Grill of 1.0 / 1.5 ton A.C. Machine (for assembled Units). 1 No

230 ELEC-6.6.18 Grill of 1.0 / 1.5 ton A.C. Machine of branded units. 1 No

231 ELEC-6.6.19 Rotary / Selector switch by new one. 1 No

232 ELEC-6.6.20 Flushing the line, leak testing, leak stopping, vaccumming, 1 No
dehydrating and charging the gas in the refrigeration
system for 1.0/ 1.5 /2.0 Ton Window A.C.Unit.

233 ELEC-6.6.21 Flushing the line, leak testing, leak stopping, vaccumming, 1 No
dehydrating and charging the gas in the refrigeration
system for 1.5 /2.0 Ton Split A.C.Unit.

234 ELEC-6.6.22 Spray painting of Refrigerator using good quality paint after 1 No
scraping the surface etc.

235 ELEC-6.6.23 New sealed compressor of 1/8 HP suitable for 165 to 185 1 No
Ltrs. Capacity Refrigerator.

236 ELEC-6.6.24 Sealed compressor of 1/6 HP suitable for 285 / 310 Ltrs. 1 No
Capacity Refrigerator.

237 ELEC-6.6.25 Supply of fan motor by new 1/10 t0 1/12 H.P 1250 RPM fan 1 No
motor for Water Cooler of 80-150 Ltrs.

238 ELEC-6.6.26 Bush for fan motor of 80-150 Lts. 1 No

239 ELEC-6.6.27 Resistance type regulator for ceiling fans 900/1200/1400mm 1 No


sweep complete erected on existing board.

240 ELEC-6.6.28 Installation of 1.5 / 2.0 TR Split Air Conditioners. 1 No


241 ELEC-6.6.29 Removing of existing 1.5 / 2.0 TR Split Air Conditioners 1 No
without damaging to copper pipe.
242 ELEC-6.6.30 Installation of 1.5 / 2.0 / 3.0 TR Cassette type Split Air 1 No
Conditioners.

243 ELEC-6.6.31 Installation of 1.5 / 2.0 / 3.0 TR Tower type Split Air 1 No
Conditioners.

244 ELEC-6.6.32 Supply,Fabrication of 1set MS bracket suitable for fixing 1 Set


out door unit of Casseete AC unit.
245 ELEC-6.6.33 Providing 2 runs of Copper tubes for suction and liquid 1 Mtr
between indoor and outdoor unit for split/Casseete Air-
Conditione foaming etc., complete. 1.7/8" x 1/2"
246 ELEC-6.6.34 Providing 2 runs of Copper tubes for suction and liquid 1 Mtr
between indoor and outdoor unit for split / Casseete Air-
Conditioner including foaming etc., complete. 1. 1 1/8" x 5/8"

6.7 EVAPORATIVE AIR COOLING SYSTEM


ELEC-6.7.1 Supply of single phase evaporative air
cooling unit with a capacity of 8000 CFM
consisting cabinet and water tank made of
polypropylene material, blower water pump
of 40W, single phase 1.20 KW motor axial
type fan with variable speed, 20 micron
filteration, noise level less than 78 dBA with
auto cleaning and water lack protection etc
complete. Makes: Cool Breeze / Breeze Air

ELEC-6.7.2 Supply of single phase evaporative air


cooling unit with a capacity of 11000 -
12000 CFM consisting cabinet and water
tank made of polypropylene material,
blower water pump of 40W, single phase
1.20 KW / 1.5 KW motor axial type fan with
variable speed, 20 micron filteration, noise
level less than 78 dBA with auto cleaning
and water lack protection etc complete.
Makes: Cool Breeze / Breeze Air

ELEC-6.7.3 Supply of three phase evaporative air


cooling unit with a capacity of 17000 CFM
consisting cabinet and water tank made of
polypropylene material, blower water pump
of 60W, three phase, 3.0 KW motor, axial
type fan with 2 speed, 20 micron filteration,
noise level less than 78 dBA with auto
cleaning and water lack protection etc
complete. Makes: Cool Breeze / Breeze Air

ELEC-6.7.4 Supply, Fabrication and errection of GI


ducting of 24 guage with necessary GI / MS
supports. Makes : Tata / Zindal
ELEC-6.7.5 Supply and fixing of 40mm thick thermocole
insulation of 16 kg density with GI mesh
and 12mm thick cement mortor plastering
for out door unit
ELEC-6.7.6 Supply and fixing of 40mm thick glasswool
of 24 kg density with alluminium foil
insulation for indoor duct.
ELEC-6.7.7 Supply and fixing of alluminium powder
coated grill with volume control dampers.
ELEC-6.7.8 Supply and fixing of angular iron frame with
2 coats of zincromat red oxide for
installation of air cooling unit.
ELEC-6.7.9 Installation and commissioning charges for
air cooling unit.
1 6.8 STABILIZERS
2 ELEC-6.8.1 Supply of 0.5 KVA Stabilizer of make V-Guard / Real Guard / 1 No
Uni Stab / ITL.

3 ELEC-6.8.2 Supply of 0.5 KVA Stabilizer of make Keeline / Soft Line / 1 No


Capri.

4 ELEC-6.8.3 Supply of 1.0 KVA Stabilizer of make V-Guard / Real Guard / 1 No


Uni Stab / ITL.

5 ELEC-6.8.4 Supply of 1.0 KVA Stabilizer of make Keeline / Soft Line / 1 No


Capri.

6 ELEC-6.8.5 Supply of 3.0 KVA Stabilizer of make V-Guard / Real Guard / 1 No


Uni Stab / ITL.

7 ELEC-6.8.6 Supply of 3.0 KVA Stabilizer of make Keeline / Soft Line / 1 No


Capri.

8 ELEC-6.8.7 Supply of 4.0 KVA Stabilizer of make V-Guard / Real Guard / 1 No


Uni Stab / ITL.

9 ELEC-6.8.8 Supply of 4.0 KVA Stabilizer of make Keeline / Soft Line / 1 No


Capri.

10 ELEC-6.8.9 Supply of 5.0 KVA Stabilizer of make V-Guard / Real Guard / 1 No


Uni Stab / ITL.

11 ELEC-6.8.10 Supply of 5.0 KVA Stabilizer of make Keeline / Soft Line / 1 No


Capri.

#REF! 7.1 SWAGED POLES / OCTOGONAL POLES, GARDEN


POSTS AND ACCESSORIES
#REF! ELEC-7.1.1 Fabrication, supply and transportation of all 1 Kg
sizes swaged poles up to site confirming to
IS 2713 / 1980 specifications. The pole
should be painted with primary coat of red
oxide and black bituminous paint up to
ground level with base plate, including cost
of all materials etc., complete.(Rate per K.
G)

#REF! ELEC-7.1.2 Fabrication and Supply of M.S. Poles for 1 Kg


garden posts with 'B' class 60.25mm outer
dia with base plate and suitable pole cap
including cost and conveyance of all
material including fixing of luminaire and
labour charges etc., complete. (Rate per K.
G)

#REF! ELEC-7.1.3 Supply of different sizes of M. S. Pipe 1 Kg


brackets (Rate per K.G)
#REF! 7.2 OCTOGONAL POLES
#REF! ELEC-7.2.1 Fabrication, Transportation and supply of hot-dip galvanized 1 No
Octogonal Pole with BSEN - 10025 grade S 355 JO steel
plate for shaft, IS 2062 for base plate with door opening
arrangement, including the supply of suitable boards with
bakelite sheet and MCB's as per IS specification suitable to
withstand the wind speed of 180 KMPH for 9 Mtrs height Pole
having dimensions Bottom 155 mm,. Top 70mm with 3mm
thick, base plate 220 x 220 x12mm and 4 Nos of M24 x 750
long 'J' bolts along with template of Makes Bajaj / Valmont
/ Aster / TRANSRAIL .

#REF! ELEC-7.2.2 Fabrication, Transportation and supply of hot-dip galvanized 1 No


Octogonal Pole with BSEN - 10025 grade S 355 JO steel
plate for shaft, IS 2062 for base plate with door opening
arrangement, including the supply of suitable boards with
bakelite sheet and MCB's as per IS specification suitable to
withstand the wind speed of 180 KMPH for 9 Mtrs height Pole
having dimensions Bottom 155 mm,. Top 70mm with 3mm
thick, base plate 220 x 220 x12mm and 4 Nos of M24 x 750
long 'J' bolts along with template of Makes : Surya /
LAASMA

ELEC-7.2.3 Fabrication, Transportation and supply of hot-dip galvanized


Octogonal Pole with BSEN -10025 grade S 355 JO steel plate
for shaft, IS 2062 for base plate with door opening
arrangement, including the supply of suitable boards with
bakelite sheet and MCB's as per IS specification suitable to
withstand the wind speed of 180 KMPH for 9mtrs height
Pole having dimensions Bottom 155mm, Top 70mm with
3mm thick, base plate 260 x260 x16mm and 4 Nos of M24 x
750 long 'J' bolts along with template ofMakes: Bajaj /
Valmont / TRANSRAIL

#REF! ELEC-7.2.4 Fabrication, Transportation and supply of hot-dip galvanized 1 No


Octogonal Pole with BSEN -10025 grade S 355 JO steel plate
for shaft, IS 2062 for base plate with door opening
arrangement, including the supply of suitable boards with
bakelite sheet and MCB's as per IS specification suitable to
withstand the wind speed of 180 KMPH for 9mtrs height
Pole having dimensions Bottom 155mm, Top 70mm with
3mm thick, base plate 260 x260 x16mm and 4 Nos of M24 x
750 long 'J' bolts along with template of Makes Surya. /
LAASMA

#REF! ELEC-7.2.5 Fabrication, Transportation and supply of hot-dip galvanized 1 No


Octogonal Pole with BSEN - 10025 grade S 355 JO steel
plate for shaft, IS 2062 for base plate with door opening
arrangement, including the supply of suitable boards with
bakelite sheet and MCB's as per IS specification suitable
to withstand the wind speed of 180 KMPH for 10 Mtrs height
Pole having dimensions Bottom 175 mm,.Top 70mm with
3mm thick, base plate 275 x 275 x16mm and 4 Nos of
M24 x 750 long 'J' bolts along with template of Makes Bajaj
/ Valmont / TRANSRAIL.
#REF! ELEC-7.2.6 Fabrication, Transportation and supply of hot-dip 1 No
galvanized Octogonal Pole with BSEN - 10025 grade S
355 JO steel plate for shaft, IS 2062 for base
plate with door opening arrangement, including the
supply of suitable boards with bakelite sheet and MCB's
as per IS specification suitable to withstand the wind
speed of 180 KMPH for 10 Mtrs height Pole having
dimensions Bottom 175 mm,. Top 70mm with 3mm thick,
base plate 275 x 275 x16mm and 4 Nos of M24 x 750
long 'J' bolts along with template of Makes: LAASMA /
Surya.

#REF! ELEC-7.2.7 Fabrication, Transportation and supply of hot-dip 1 No


galvanized Octogonal Pole with BSEN - 10025 grade S
355 JO steel plate for shaft, IS 2062 for base
plate with door opening arrangement, including the
supply of suitable boards with bakelite sheet and MCB's
as per IS specification suitable to withstand the wind
speed of 180 KMPH for 12 mtrs height Pole having
dimensions Bottom 200mm / 240mm, Top 100mm /
90mm with 4mm thick, base plate 320 x320 x20mm and 4
Nos of M24 x 850 long 'J' bolts along with template of Makes
Bajaj / Valmont /TRANSRAIL.

#REF! ELEC-7.2.8 Fabrication, Transportation and supply of hot-dip 1 No


galvanized Octogonal Pole with BSEN - 10025 grade S
355 JO steel plate for shaft, IS 2062 for base
plate with door opening arrangement, including the
supply of suitable boards with bakelite sheet and MCB's
as per IS specification suitable to withstand the wind
speed of 180 KMPH for 12 mtrs height Pole having
dimensions Bottom 200mm / 240mm, Top 100mm /
90mm with 4mm thick, base plate 320 x320 x20mm and 4
Nos of M24 x 850 long 'J' bolts along with template of Makes:
LAASMA / Surya.

7.3 BRACKETS
#REF! ELEC-7.3.1 Fabrication, Transportation and supply of 1.0 Mtr Length 1 No
Single Arm Bracket made with MS galvanized 40mm / 50mm
dia Pipe.
#REF! ELEC-7.3.2 Fabrication, Transportation and supply of 1.50 Mtr 1 No
Length Single Arm Bracket made with MS galvanized
40mm / 50mm dia Pipe.
#REF! ELEC-7.3.3 Fabrication, Transportation and supply of of 1.5mtrs 1 No
sword type decorative double arm bracket with dooms
either sides complete with all accessories with MS
galvanized 50mm dia Pipe.
#REF! ELEC-7.3.4 Fabrication, Transportation and supply of 1.5mtrs decorative 1 No
galvanized Single arm bracket with PU paint complete with all
accessories with MS galvanized 50mm dia Pipe

#REF! ELEC-7.3.5 Fabrication, Transportation and supply of 1 Mtr length Double 1 No


Arm standard Bracket made with MS galvanized 50mm dia
Pipe.
ELEC-7.3.6 Fabrication, Transportation and supply of 1.50 Mtr length 1 No
Double Arm standard Bracket made with MS galvanized
50mm dia Pipe
ELEC-7.3.7 Fabrication, Transportation and supply of 1 Mtr length 1 No
Double Arm Bracket made with MS galvanized 40mm / 50mm
dia Pipe.
ELEC-7.3.8 Fabrication, Transportation and supply of 1.50 Mtr 1 No
length Double Arm Bracket made with MS galvanized 40mm
/ 50mm dia Pipe.
7.4 HIGH MAST POLES
#REF! ELEC-7.4.1 Fabrication, transportation and supply of 12 Mtrs Polygon 1 No
High Mast with single section of 3mm thick of Bottom 360mm
and Top 150mm dia with BSEN - 10025 grade S 355 JO steel
plate for shaft, IS 2062 for base plate, having a base plate of
size 520mm dia 16mm thick with its accessories. Mast shall
be in single section for 12 Mtrs and 2 sections for 16 and 20
Mtrs. Mast shall be hot dip galvanized and suiatble for wind
velocity of 180 KMPH as per IS 875 part 3 including head
frame, 2 point suspension system with steel rope 6mm dia
(7/19) construction double drum winch / power tool operating
speed of 900 RPM, and necessary cable trailer connections
and single speed motor with M 24 x 800 mm foundation bolts
of required quantity, suitable for 6 luminaires with GLS type
aviation twin lamp.
Makes: Bajaj / Valmont / TRANSRAIL

#REF! ELEC-7.4.2 Fabrication, transportation and supply of 12 1 No


Mtrs Polygon High Mast with single section
of 3mm thick of Bottom 360mm and Top
150mm dia with BSEN - 10025 grade S 355
JO steel plate for shaft, IS 2062 for base
plate, having a base plate of size 520mm
dia 16mm thick with its accessories. Mast
shall be in single section for 12 Mtrs and 2
sections for 16 and 20 Mtrs. Mast shall be
hot dip galvanized and suiatble for wind
velocity of 180 KMPH as per IS 875 part 3
including head frame, 2 point suspension
system with steel rope 6mm dia (7/19)
construction double drum winch / power
tool operating speed of 900 RPM, and
necessary cable trailer connections and
single speed motor with M 24 x 800 mm
foundation bolts of required quantity,
suitable for 6 luminaires with GLS type
aviation twin lamp.
Makes : Surya / LAASMA
#REF! ELEC-7.4.3 Fabrication, transportation and supply of 16 1 No
Mtrs Polygon High Mast with two sections
of Bottom 4mm thick and Top section with
3mm thick with GLS type aviation lamp of
Bottom 360mm and Top 150mm dia with
BSEN - 10025 grade S 355 JO steel plate
for shaft, IS 2062 for base plate, having a
base plate of size 560mm dia 25mm thick
with its accessories. Mast shall be in 2
sections and should be hot dip galvanized
and suiatble for wind velocity of 180 KMPH
as per IS 875 part 3 including head frame, 2
point suspension system with steel rope
6mm dia (7/19) construction double drum
winch / power tool operating speed of 900
RPM, and necessary cable trailer
connections and single speed motor with
M 24 x 800 mm foundation bolts of required
quantity with GLS type aviation twin lamp
Makes: Bajaj / Valmont / TRANSRAIL

#REF! ELEC-7.4.4 Fabrication, transportation and supply of 16 1 No


Mtrs Polygon High Mast with two sections
of Bottom 4mm thick and Top section with
3mm thick with GLS type aviation lamp of
Bottom 360mm and Top 150mm dia with
BSEN - 10025 grade S 355 JO steel plate
for shaft, IS 2062 for base plate, having a
base plate of size 560mm dia 25mm thick
with its accessories. Mast shall be in 2
sections and should be hot dip galvanized
and suiatble for wind velocity of 180 KMPH
as per IS 875 part 3 including head frame, 2
point suspension system with steel rope
6mm dia (7/19) construction double drum
winch / power tool operating speed of 900
RPM, and necessary cable trailer
connections and single speed motor with
M 24 x 800 mm foundation bolts of required
quantity with GLS type aviation twin lamp
Makes : Surya / LAASMA
#REF! ELEC-7.4.5 Fabrication, transportation and supply of 20 1 No
Mtrs Polygon High Mast with two sections
of Bottom 4mm thick and Top section with
3mm thick of Bottom 410mm and Top
150mm dia with BSEN - 10025 grade S 355
JO steel plate for shaft, IS 2062 for base
plate, having a base plate of size 570mm
dia 25mm thick with its accessories. Mast
shall be in 2 sections and should be hot dip
galvanized and suiatble for wind velocity of
180 KMPH as per IS 875 part 3 including
head frame, 2 point suspension system with
steel rope 6mm dia (7/19) construction
double drum winch / power tool operating
speed of 900 RPM, and necessary cable
trailer connections and single speed motor
with M 24 x 800 mm foundation bolts of
required quantity with GLS type aviation
twin lamp.
Makes: Bajaj / Valmont / TRANSRAIL.

#REF! ELEC-7.4.6 Fabrication, transportation and supply of 20 1 No


Mtrs Polygon High Mast with two sections
of Bottom 4mm thick and Top section with
3mm thick of Bottom 410mm and Top
150mm dia with BSEN - 10025 grade S 355
JO steel plate for shaft, IS 2062 for base
plate, having a base plate of size 570mm
dia 25mm thick with its accessories. Mast
shall be in 2 sections and should be hot dip
galvanized and suiatble for wind velocity of
180 KMPH as per IS 875 part 3 including
head frame, 2 point suspension system with
steel rope 6mm dia (7/19) construction
double drum winch / power tool operating
speed of 900 RPM, and necessary cable
trailer connections and single speed motor
with M 24 x 800 mm foundation bolts of
required quantity with GLS type aviation
twin lamp.
Makes : Surya / LAASMA

7.5 FEEDER PILLER BOX


#REF! ELEC-7.5.1 Supply and fixing of suitable feeder piller 1 No
box made with 14 SWG CRCA sheet
including S & F of Legrand / Schnieder /
Siemens / ABB / L&T make 40A TP MCB,
6 Nos SP MCB's, din channel, 6 Sqmm 3
core copper cable for invidual light control,
contactor, connectors and provision for
energy meter etc., complete for finished
item of work

#REF! ELEC-7.5.2 Supply and fixing of suitable feeder piller 1 No


box made with 14 SWG CRCA sheet
including S & F of Legrand / Schnieder /
Siemens / ABB / L&T make 63A TP MCB,
8 Nos SP MCB's, din channel, 6 Sqmm 3
core copper cable for invidual light control,
connectors and provision for energy meter
etc., complete for finished item of work.

7.6 ERRECTION OF HIGH MAST POLES


#REF! ELEC-7.6.1 Earth work exacavation with a approximate 1 No
quantity of 4.0 Cum for errection of 12 Mtrs
high mast and refilling with a quantity of
0.53 Cum of PCC 1:4:8, 1.50 Cum M 20
grade concrete and (80 Kgs) reinforced
steel of 12mm / 10mm / 8mm, Soil bearing
capacity of 10 T/Sqm, Anchor plate with
cost and conveyance of all above materials
including labour charges for errection of
High Mast and Carraige etc complete

#REF! ELEC-7.6.2 Earth work exacavation with a approximate 1 No


quantity of 6.0 Cum for errection of 16 Mtrs
high mast and refilling with a quantity of
0.65 Cum of PCC 1:4:8, 2.60 Cum M 20
grade concrete and (110 Kgs) reinforced
steel of 12mm / 10mm / 8mm, Soil bearing
capacity of 10 T/Sqm, Anchor plate with
cost and conveyance of all above materials
including labour charges for errection of
High Mast and Carraige etc complete.

#REF! ELEC-7.6.3 Earth work exacavation with a approximate 1 No


quantity of 7.0 Cum for errection of 20 Mtrs
high mast and refilling with a quantity of
0.75 Cum of PCC 1:4:8, 3.60 Cum M 20
grade concrete and (140 Kgs) reinforced
steel of 12mm / 10mm / 8mm, Soil bearing
capacity of 10 T/Sqm, Anchor plate with
cost and conveyance of all above materials
including labour charges for errection of
High Mast and Carraige etc complete

7.7 CONICAL POLES


#REF! ELEC-7.7.1 Fabrication,transportation and supply of 1 No
MS hot dip galvanized 9.0 Mtrs long
Conical poles with 3mm thick HT steel plate
with a bottom 173mm dia and top 75mm
dia, base plate of size
275mmx275mmx16mm thick welded to
bottom of pole, terminal box with door size
of 500mmx100mm with all accessories
connector and fuse base and a fixing
arrangements for advertisements holdings,
foundation bolts with washers and nuts 4
sets. including S&F of 1.0 mtrs C type
decorative single arm with painted bracket
with dooms either sides complete with all
accessories as per the requirements at site
and as per the directions of field engineers
during execution for finished item of work.
Makes: Bajaj / Valmont / TRANSRAIL
#REF! ELEC-7.7.2 Fabrication,transportation and supply of 1 No
MS hot dip galvanized 9.0 Mtrs long
Conical poles with 3mm thick HT steel plate
with a bottom 173mm dia and top 75mm
dia, base plate of size
275mmx275mmx16mm thick welded to
bottom of pole, terminal box with door size
of 500mmx100mm with all accessories
connector and fuse base and a fixing
arrangements for advertisements holdings,
foundation bolts with washers and nuts 4
sets. including S&F of 1.0 mtrs C type
decorative single arm with painted bracket
with dooms either sides complete with all
accessories as per the requirements at site
and as per the directions of field engineers
during execution for finished item of work.
Makes : Surya / LAASMA

#REF! ELEC-7.7.3 Fabrication,transportation and supply of 1 No


MS hot dip galvanized 10.0 Mtrs long
Conical poles with 3mm thick HT steel plate
with a bottom 184mm dia and top 75mm
dia, base plate of size
275mmx275mmx16mm thick welded to
bottom of pole, terminal box with door size
of 500mmx100mm with all accessories
connector and fuse base and a fixing
arrangements for advertisements holdings,
foundation bolts with washers and nuts 4
sets. including S&F of 1.5 mtrs C type
decorative Double arm with painted
bracket with dooms either sides complete
with all accessories as per the requirements
at site and as per the directions of field
engineers during execution for finished item
of work.
Makes: Bajaj / Valmont / TRANSRAIL

#REF! ELEC-7.7.4 Fabrication,transportation and supply of 1 No


MS hot dip galvanized 10.0 Mtrs long
Conical poles with 3mm thick HT steel plate
with a bottom 184mm dia and top 75mm
dia, base plate of size
275mmx275mmx16mm thick welded to
bottom of pole, terminal box with door size
of 500mmx100mm with all accessories
connector and fuse base and a fixing
arrangements for advertisements holdings,
foundation bolts with washers and nuts 4
sets. including S&F of 1.5 mtrs C type
decorative Double arm with painted
bracket with dooms either sides complete
with all accessories as per the requirements
at site and as per the directions of field
engineers during execution for finished item
of work.
Makes : Surya / LAASMA

7.8 THERMO PLASTIC POLE BOXES


#REF! ELEC-7.8.1 Supply of following sizes thermo plastic pole boxes
IP 65
protection Make : Hensel / Sintex
#REF! ELEC-7.8.1a 300X150X170
#REF! ELEC-7.8.1b 300X300X170
#REF! ELEC-7.8.1c 300X450X170
#REF! ELEC-7.8.1d 300X600X170
7.9 FOUNDATION AND ERRECTION CHARGES OF POLES
#REF! ELEC-7.9.1 Erection charges for 7.50 Mts long 1 No
Octagonal pole on bridge kerb portion
(R.C.C). with 4 Nos 8" Anchor bolts/
M20xsuitable "J" type bolts etc duly drilling
holes to RCC slab and with V.C.C. M.15
concrete for base concreting up to a height
of 8" with necessary Reinforcement work
etc. including cost and con veyance of all
material and all labour charges etc.
complete as directed by the department
officers

#REF! ELEC-7.9.2 Foundation and erection charges with


special T&P, for 7.50 Mtrs long Octagonal /
Conical pole duly erecting on base plate
duly providing 4 Nos foundation bolts with
nuts with providing of
0.45Mtrx0.45Mtrsx1.20 Mtr size M20 cc
work vibrated concreting mixing with
necessary steel (10kgs) reinforcement as
directed by the field engineers during
execution including all labour charges and
cost and conveyance of materials etc.
complete.

#REF! ELEC-7.9.3 Foundation and erection charges with 1 No


special T&P, for 9.00Mtrs / 10Mtrs long
Octagonal / Conical pole duly erecting on
base plate duly providing 4 Nos foundation
bolts with nuts with providing of
0.60Mtrx0.60Mtrsx1.40 Mtr size M20 cc
work vibrated concreting mixing with
necessary steel (15kgs) reinforcement as
directed by the field engineers during
execution including all labour charges and
cost and conveyance of materials etc.
complete

#REF! ELEC-7.9.4 Foundation and erection charges with 1 No


special T&P, for 12Mtrs long Octagonal /
Conical pole duly erecting on base plate
duly providing 4 Nos foundation bolts with
nuts with providing of
0.67Mtrx0.67Mtrsx1.50 Mtr size M20 cc
work vibrated concreting mixing with
necessary steel (20kgs) reinforcement as
directed by the field engineers during
execution including all labour charges and
cost and conveyance of materials etc.
complete.

7.10 G R P POLES
ELEC-7.10.1 Supply and transportation of following glass reinforced
polymer (GRP) composite type Conical pole with single arm
bracket of length 1Mtr and internal junction box including
labour charges etc., complete.
Makes: Bajaj / Kemrock / Sumip.
ELEC-7.10.1a 3.00 Mtrs height, Bottom dia 143mm, Top 76mm, AV 1 No
thickness 6mm and to withstand maximum wind velocity
155Km/Hr
ELEC-7.10.1b 4.00 Mtrs height, Bottom dia 143mm, Top 76mm, 1 No
AV thickness 6mm and to withstand maximum wind
velocity 155Km/Hr
#REF! ELEC-7.10.1c 6.00 Mtrs height, Bottom dia 143mm, Top 76mm, 1 No
AV thickness 6mm and to withstand maximum wind
velocity 155Km/Hr
#REF! ELEC-7.10.1d 8.00 Mtrs height, Bottom dia 193mm, Top 76mm, 1 No
AV thickness 6mm and to withstand maximum wind
velocity 155Km/Hr
#REF! ELEC-7.10.1e 10.00 Mtrs height, Bottom dia 227mm, Top 76mm, AV 1 No
thickness 6mm and to withstand maximum wind velocity
155Km/Hr
#REF! ELEC-7.10.2 Supply and transportation of base bracket suitable for
glass reinforced polymer (GRP) composite type pole including
labour charges etc., complete. Makes: Bajaj / Kemrock /
Sumip.
#REF! ELEC-7.10.2a For 3.00 Mtrs Pole 1 No
#REF! ELEC-7.10.2b For 4.00 Mtrs Pole 1 No
#REF! ELEC-7.10.2c For 6.00 Mtrs Pole 1 No
#REF! ELEC-7.10.2d For 8.00 Mtrs Pole 1 No
#REF! ELEC-7.10.2e For 10.00 Mtrs Pole 1 No
#REF! 7.11 CONTROL PANEL BOARD
#REF! ELEC-7.11.1 Fabrication and erection of 14SWG CRCA sheet steel 1 sq.
enclosure for power control cubicle panel / boxes etc., Mtr
including cutting, bending drilling, welding and reveting
etc., complete with cleaning with 7 tank process and painting
with powder coating including cost and conveyance of all
materials and labour charges.

#REF! ELEC-6.2.2 Fabrication and erection of 16 SWG CRCA sheet steel 1 sq.
enclosure for power control cubicle panel / boxes etc., Mtr
including cutting, bending drilling, welding and reveting
etc., complete with cleaning with 7 tank process and painting
with powder coating including cost and conveyance of all
materials and labour charges.

#REF! ELEC-6.2.3 Fabrication and erection of 18SWG CRCA sheet steel 1 sq.
enclosure for power control cubicle panel / boxes etc., Mtr
including cutting, bending drilling, welding and reveting etc.,
complete with cleaning with 7 tank process and painting with
powder coating including cost and conveyance of all
materials and labour charges.

#REF! 7.12 METERING EQUIPMENT


#REF! ELEC-7.12.1 Supply and erection of 0-415V volt Digital meter on exisiting 1 No
box / panel board including connections etc.,
complete.CONZERVE /ELMEASURE / MECO / HPL MAKE.
#REF! ELEC-7.12.2 Supply and erection of 0-415V volt Analog meter of on 1 No
exisiting box / panel board including connections etc.,
complete.CONZERVE /ELMEASURE / MECO / HPL MAKE.

#REF! ELEC-7.12.3 Supply and erection of 0-100 /200 /400 /600 /1000 Digital 1 No
Ammeter of size 96x96mm on existing box/panel board
including connections etc., complete. CONZERVE/
ELMEASURE/ MECO/ HPL MAKE.

#REF! ELEC-7.12.4 Supply and erection of 0-100/ 200 / 400 / 600 /1000 Analog 1 No
Ammeter of size 96x96mm on existing box / panel board
including connections etc., complete. CONZERVE/
ELMEASURE/ MECO/ HPL MAKE.

#REF! ELEC-7.12.5 Supply and erection of Digital frequency meter of size 1 No


96x96mm on existing box / panel board including
connections etc., complete.CONZERVE /
ELMEASURE/MECO / HPL MAKE.

#REF! ELEC-7.12.6 Supply and erection of Digital power factor meter, 3 phase, 4 1 No
wire balanced or unabalanced load 5A, 415V of size
96x96mm on existing box / panel board including connections
etc.,complete.CONZERVE/ELMEASURE/MECO/ HP MAKE.

#REF! ELEC-7.12.7 Supply and erection of L.T. 3phase Digital multifunction 1 No


energy meter with 3 lines LCD display of size 96x96mm for
measuring all the parameters (voltage / Current / Power /
frequency / power factor / kw / kwh / KVAR/ KVARH/) on
existing box panel board including connections etc.,
complete.CONZERVE/ELMEASURE/MECO/ HPL MAKE.

#REF! ELEC-7.12.8 Supply and erection of selector switch for voltmeter / Ammeter 1 No
on the existing box / panel including connections etc.,
complete. L&T / C&S / SALZAR / HPL MAKE.

#REF! ELEC-7.12.9 Supply and erection of LED indicator lamps on the existing 1 No
box / panel board.L&T / C&S / SALZAR / HPL MAKE.

#REF! ELEC-7.12.10 Supply and erection of LT current transformer with bar primary 1 No
100/5A to 1000 / 5A ratio in the existing box / panel including
connections etc., complete. KAPPA MAKE.

#REF! ELEC-7.12.11 Supply and fixing of single phase Electronic energy 1 No


Meter,240V AC,50 HZ as per IS13010 up to 40A range with
200% over load capacity complete with connections etc.,
complete on the existing board. CONZERVE / ELMEASURE /
MECO / HPL / HAVELLS MAKE.
#REF! ELEC-7.12.12 Supply and fixing of three phase Electronic energy Meter, 1 No
415V AC,50 HZ as per IS13010 up to 40A range with 200%
over load capacity complete with connections etc.,
complete on the existing board. CONZERVE / ELMEASURE /
MECO / HPL / HAVELLS MAKE.

#REF! ELEC-7.12.13 Supply and fixing of 8 Stage APFC Relay with connection etc 1 No
complete.(L&T / Siemens / EPCOS / Schneider / Elmeasure)

#REF! ELEC-7.12.14 Supply and fixing of 14 Stage APFC Relay with connection 1 No
etc complete.(L&T/ Siemens / EPCOS/ Schneider
/Elmeasure)

#REF! 7.13 SUB STATION EQUIPMENT


#REF! ELEC-7.13.1 Carryout routine maintenance, servicing and testing of 630A 1 No
to 1000A L.T.ACB by cleaning fixed contacts, moving contacts
and arcchutes including servicing and putting the ACB in
perfect working condition after detting all relay and ON, OFF
mechanism etc. Done with only manufacturing companies

#REF! ELEC-7.13.2 Carryout routine maintenance and servicing of LT.Cubical 1 No


pannel board having approximately 15 to 22 Nos of switches
cleaning with power brower and servicing the contacts,
tightning the connection of incoming and outgoing
cables, and clicking the operating machanism for smooth
functioning of switches and putting them in smooth working
condition.

#REF! ELEC-7.13.3 Routine maintenance of transformer in operation covering 1 No


insulation resistance oil, break down strength.
Reconditioning / replacement of silicazel, cleaning of
transformer and topping upto oil level if required (extra cost
will be paid for oil).

#REF! ELEC-7.13.4 Testing of Transformer oil for dielectric breakdown strength. 1 No

#REF! ELEC-7.13.5 Removing the existing transformer from the plinth / Pole and 1 No
refixing the standby transformer of following capacity
including connections etc., complete.- Upto 315 KVA

#REF! ELEC-7.13.6 Removing the existing transformer from the plinth / Pole and 1 No
refixing the standby transformer of following capacity
including connections etc., complete. -500 / 1000 KVA

#REF! ELEC-7.13.7 Replacing old and unserviceable gasket of top cover plate of 1 No
transformer having following capacity. -Upto 315 KVA

#REF! ELEC-7.13.8 Replacing old and unserviceable gasket of top cover plate of 1 No
transformer having following capacity. -500 / 1000 KVA

#REF! ELEC-7.13.9 Replacing old and unserviceable gasket of H. T bushing 1 No


for the following Transformer capacity. -Upto 315 KVA
#REF! ELEC-7.13.10 Replacing old and unserviceable gasket of H. T bushing 1 No
for the following Transformer capacity. -500 / 1000 KVA

#REF! ELEC-7.13.11 Replacing old and unserviceable gasket of L.T bushing for 1 No
the following transformer capacity. Upto 315 KVA

#REF! ELEC-7.13.12 Replacing old and unserviceable gasket of L.T bushing for 1 No
the following transformer capacity. 500 / 1000 KVA

#REF! ELEC-7.13.13 Replacement the H/T / L. T burntout winding coils of 1 Kg


distribution transformer including rewinding, varnishing
and vaccuming etc.,duly retaining the removed burnt winding
coils by the Contractor / Firm- For copper coils

#REF! ELEC-7.13.14 Replacement the H/T / L. T burntout winding coils of 1 Kg


distribution transformer including rewinding, varnishing
and vaccuming etc.,duly retaining the removed burnt winding
coils by the Contractor / Firm - For aluminium coils

#REF! ELEC-7.13.15 Insulating HT / LT copper / aluminium coils for Transformers. 1 No

#REF! ELEC-7.13.16 Painting with 2 coats Zinchromate red oxide duly scraping 1 No
existing paint followed by 2 coats of hammerton grey paint
etc., complete. -Upto 500 KVA

#REF! ELEC-7.13.17 Painting with 2 coats Zinchromate red oxide duly scraping 1 No
existing paint followed by 2 coats of hammerton grey paint
etc., complete. - 630 / 1000 KVA

#REF! ELEC-7.13.18 Replacing H.T bushing for distribution Transformer by new 1 No


one.

#REF! ELEC-7.13.19 Replacing H.T bushing metal parts for distribution 1 No


Transformer by new one.

#REF! ELEC-7.13.20 Replacing L.T bushing for distribution Transformer by new 1 No


one for the following capacities. - Upto 315 KVA

#REF! ELEC-7.13.21 Replacing L.T bushing for distribution Transformer by new 1 No


one for the following capacities.- 500 / 1000 KVA

#REF! ELEC-7.13.22 Replacing L.T bushing metal parts for distribution 1 No


Transformer by new one for the following capacities. -100
KVA

#REF! ELEC-7.13.23 Replacing L.T bushing metal parts for distribution Transformer 1 No
by new one for the following capacities. -250 / 315 KVA

#REF! ELEC-7.13.24 Replacing L.T bushing metal parts for distribution Transformer 1 No
by new one for the following capacities. -500 KVA
#REF! ELEC-7.13.25 Replacing L.T bushing metal parts for distribution Transformer 1 No
by new one for the following capacities. -1000 KVA

#REF! ELEC-7.13.26 Drying the repaired transformer with appropriate heat / air of 1 No
following capacity of transformers. -Upto 315 KVA

#REF! ELEC-7.13.27 Drying the repaired transformer with appropriate heat / air of 1 No
following capacity of transformers. -500 / 1000KVA

#REF! ELEC-7.13.28 Loading and Unloadng of transformer from site to Workshop 1 No


or vice verse. -Upto 500 KVA

#REF! ELEC-7.13.29 Loading and Unloaidng of transformer from site to Workshop 1 No


or vice verse. -630 / 1000 KVA

#REF! ELEC-7.13.30 Transformer oild tested as per IS-335 - 1972 (per Ltr) 1 Ltr

#REF! ELEC-7.13.31 Filteration of transformer oil as per ISS specifications filters to 1 Ltr
die electric strength above 40 K. V at site. (per Ltr)

#REF! ELEC-7.13.32 Filteration of transformer oil as per ISS specifications filters to 1 Ltr
die electric strength above 40 K. V at workshop (per Ltr)

#REF! ELEC-7.13.33 Supply of MPP type heavy duty capacitor of operating 1 KVAR
voltage not less than 480V and losses not more than 0.35W
per KVAR and inrush current withstand capability 300 times
the rated current. Makes:L&T/Siemens/Schneider/Eplos.

7.14 TRANSFORMERS
#REF! ELEC-7.14.1 Supply, transportation and delivery at site of 3 Phase, 50 Hz,
oil immersed and naturally cooled, outdoor / Indoor type
copper wound transformer designed and manufactured as
per IS 2026-1977 and 1st filling of oil as per IS 335 of 1993,
connected delta on primary side and Star on secondary side
with additional neutral brought out on load side, 1100V /
(433V / 415V) with HV tapping + or - 2.5% contineously rated
for full load and temporature rise not exceeding 50°C in oil
and 55°C rise by th resistance of the winding after contineous
run on full load rating complete with the following standard
mountings. Makes: Kirloskar / Vijay Electricals / PETE /
Esennar

#REF! (Note:Other than these makes / brands mentioned rate


may be allowed as approved by AP Electricity Board).
#REF! 1. Rated KVA : ........KVA
2. Service: Outdoor / Indoor
3. Mounting : Plinth.
4. Copper wound : Double.
5. Type : Core.
6. Cooling : ONAN
7. Temp . Rise : 55:C.
8. Vector Group: Dyn 11
9. Primary Connection : Delta
10. Primary Volts : 11000
11. Primry Frequency : 50
12.Primary Phases : 3
13. Primary wires: 3
14. Secondary connection : Star
15. Secondary Volts : 415 / 433V
16. Secondary phases : 3
17. Secondary wires: 4
18. Taps on primary winding for primary voltage variation :
+7.5% to - 7.5% in steps of 2.5%,

#REF! 19. Terminal arrangement.


a. HV: Bare Busings / Cable end box b. LV : Cable box
20. LV : One separate terminal for earthing.
20. No load losses (Watts): ..........As per IS specification
21. Load losses (Watts): ............As per IS specification
22. Impedance(Z%) : .............As per IS specification

#REF! 21. Fittings & Accessories.


a. Rating and terminal marking plate b. Earthing terminals
c. Lifting Lugs
d. Conservator with drain plug. e. Oil level Indicator
f. Dehydrating silicagel breather
g. Air release device
h. Drain cum filter wall
i. Explosion vent with diaphragm j. Radiators (Attachable)
k. Seperate neutral bushing
l. Uni directional flat rollers.

#REF! ELEC-7.14.1a ……... do……. 63 KVA Copper Wound Transformer


#REF! ELEC-7.14.1b ……... do……. 100 KVA Copper Wound Transformer
#REF! ELEC-7.14.1c ……... do……. 160 KVA Copper Wound Transformer
#REF! ELEC-7.14.1d ……... do……. 250 KVA Copper Wound Transformer
#REF! ELEC-7.14.1e ……... do……. 315 KVA Copper Wound Transformer
#REF! ELEC-7.14.1f ……... do……. 500 KVA Copper Wound Transformer
#REF! ELEC-7.14.2 Supply, transportation and delivery at site of 3 Phase, 50 Hz,
Dry type, Indoor type copper wound transformer
designed and manufactured as per IS 2026-1977 and IS
11171-1985,connected delta on primary side and Star on
secondary side with additional neutral brought out on load
side, 1100V / (433V / 415V) with HV tapping + or - 2.5%
temporature rise by the resistance 90:C. complete with the
following standard mountings.Makes: Kirloskar / Vijay
Electricals / PETE / Esennar
#REF! (Note : Other than these makes / brands mentioned rate
may be allowed as approved by AP Electricity Board).

#REF! 1. Rated KVA : ........KVA (Cast Resin)


2. Service: Indoor
3. Mounting : Floor.
4. Copper wound : Double.
5. Type of cooling : ANAN.
6. Insulation Class : Class F
7. Temparature rise by resistance : 90:C
8. Vector Group: Dyn 11
9. Primary Connection : Delta
10. Primary Volts : 11000
11. Primry Frequency : 50
12.Primary Phases : 3
13. Primary wires: 3
14. Secondary connection : Star
15. Secondary Volts : 433V / 415V
16. Secondary phases : 3
17. Secondary wires: 4
18. Taps on primary winding for primary voltage variation :
+5.0% to - 10.0% in steps of 2.5% through links.

#REF! 19. Terminal arrangement.


a. HV: Cable end box b. LV : Cable end box
20. No load losses (Watts): ........... As per IS specifications
21. Load losses (Watts): ..............As per IS specifications
22. Impedance(Z%) : ............As per IS specifications

#REF! 21. Fittings & Accessories.


a. Rating and terminal marking plate b. Earthing terminals
c. Lifting Lugs
d. Winding temporature Indicator
e. Seperate neutral bushing
f. Uni directional flat rollers.

#REF! ELEC-7.14.2a ……... do……. 100 KVA Copper Wound Transformer 1 No


#REF! ELEC-7.14.2b ……... do……. 250 KVA Copper Wound Transformer 1 No
#REF! ELEC-7.14.2c ……... do……. 315 KVA Copper Wound Transformer 1 No
#REF! ELEC-7.14.2d ……... do……. 500 KVA Copper Wound Transformer 1 No
#REF! 7.15 L.T. LINE MATERIALS AND LIGHTENING PROTECTIVE
SYSTEM
#REF! ELEC-7.15.1 Supply and erecting approved make 11KV, 5KA metal oxide 1 No
lightning arrestors suitable for 11 KV supply with necessary
materials on existing cross arm.

#REF! ELEC-7.15.2 Supply and erecting porcelain disc type insulator suitable for 1 No
11KV line with suitable hardware on existing cross arms.

#REF! ELEC-7.15.3 Supply and erecting porcelain pin type insulator suitable for 1 No
11KV line with suitable hardware on existing cross arms.

#REF! ELEC-7.15.4 Supply and erecting porcelain post type insulator suitable for 1 No
11KV line with suitable hardware on existing cross arms.
#REF! ELEC-7.15.5 Supply and erecting porcelain pin/shackle type insulator 1 No
suitable for L. T.

#REF! ELEC-7.15.6 Approved made 11KV, 400A A.B switch with all standard 1 No
accessories etc., complete with cost and conveyance of all
materials.

#REF! ELEC-7.15.7 Approved made 11KV, 200A A.B switch with all standard 1 No
accessories etc.,complete with cost and conveyance of all
materials.

#REF! ELEC-7.15.8 Approved made 11KV, 200A A.B switch (tilting) with all 1 No
standard accessories etc., complete with cost and
conveyance of all materials.

#REF! ELEC-7.15.9 11KV, H.G fuse set including all standard accessories etc., 1 No
complete with cost and conveyance of all materials.

#REF! ELEC-7.15.10 Supply of 7/3.15 AAA C all Alluminium annealed conductor 1 Km


Rabit.

#REF! ELEC-7.15.11 Supply of 7/2.50 AAA C all Alluminium annealed conductor 1 Km


Weasel.

#REF! ELEC-7.15.12 Supply of 9.1 Mtr PSCC Pole 280 Kg Working load. 1 No

#REF! ELEC-7.15.13 Supply of 8.0 Mtr PSCC Pole 140 Kg Working load. 1 No

#REF! ELEC-7.15.14 Supply of 175 x 85 mm / 150 x 75 mm RS Joist. 1 Kg

#REF! ELEC-7.15.15 Supply and installation of NIMBUS CPT-3/NLP 2200 / 1 No


FOREND (ESE-EU) Advanced lighting protection with
capturing head of 135 - 210mm diameter, 205 -580mm height
and 4.60 - 4.940 kgs , and having Rod length 760mm, weight
1.795 kgs with stainless steel rod, working on the principle of
(ESE) Early Streamer Emission technology, having a
coverage radius of 79mts when mounted on 10 - 15 mts
height of existing lattice tower giving level 1 protection
and anticipation emission time of 60 micro seconds/72 micro
seconds. The NIMBUS is manufactured according to standard
NFC 17 102 and UNE 21186-96 including functional integrity
etc Complete. Make : NIMBUS / FOREND or equivalent

#REF! ELEC-7.15.16 Installation and commissioning of NIMBUS / FOREND or 1 No


equivalent advanced lighting protection systems which
includes
1. Laying of CC Bed
2. Installation of Lighting Rod
3. Laying of Down conductor
4. Installation of Counter
5.Installation of Earth Electrodes
6. Interconnection between the Electrodes
7.Termination of down conductor to earth bus etc complete

#REF! ELEC-7.15.17 Supply of electro-Mechanical counter (Make: CIRPROTEC / 1 Pt


INDALAC/INGESCO)
#REF! ELEC-7.15.18 Providing earth electrode of low carbon steel rod of 17mm dia 1 Pt
coated with 250 microns thick copper 3mtr long with clamps
and 2 bags of LORESCO ZEROLITE back fill compound etc
complete (As per drawings enclosed)

#REF! ELEC-7.15.19 Supply of down conductor of 1x70sqmm single core PVC 1 Mtr
insulated unarmoured copper conductor cable of ISI mark
(Make: Polycab /Havells / RPG / RR Kabel)

#REF! 8.1 NET WORKING


#REF! ELEC-8.1.1 Supply of 2 Pair, 0.5mm telephone copper wire of 100 Mtrs
makes Finolex / Delton / Surabi / Polycab / Nakoda / GM.
#REF! ELEC-8.1.2 Supply of 5 Pair telephone copper wire of makes Finolex / 100 Mtrs
Delton / Surabi / Polycab / Nakoda / GM.
#REF! ELEC-8.1.3 Supply of LAN Cable cat - 6 UTP cable of makes D 100 Mtrs
Link / AMP / Molex / Legrand / Krone.
ELEC-8.1.4 Supply of LAN Cable cat - 6 STP cable. 100 Mtrs
Makes : D Link / AMP / Molex / Legrand /
Krone
#REF! ELEC-8.1.5 Supply of Cat 6 RJ-45 information outlets including duel 1 No
face plate of makes D Link / AMP / Molex / Legrand / Krone.

ELEC-8.1.6 Supply of 48 Port switches of makes D link / CISCO / 1 No


Net Gear / HP.
#REF! ELEC-8.1.7 Supply of 24 Port switches of makes D link / CISCO / 1 No
Net Gear / HP.
#REF! ELEC-8.1.8 Supply of 8 Port switches of makes D link / CISCO / Net 1 No
Gear/ HP.
#REF! ELEC-8.1.9 Supply of 3200 access point of makes Dlink / CISCO/ Net 1 No
Gear /HP.
#REF! ELEC-8.1.10 Supply of 7 feet length moulded patch cor0d of makes 1 No
D Link / AMP / Molex / Legrand / Krone.
#REF! ELEC-8.1.11 Supply of 3 feet length moulded patch cord of makes D Link 1 No
/ AMP / Molex / Legrand / Krone.
#REF! ELEC-8.1.12 Supply of 24 port patch panels of makes D Link / AMP 1 No
/ Molex / Legrand / Krone.
#REF! ELEC-8.1.13 Supply of 100 pair MDF loaded with 2/10 Modular of Krone 1 No
make or its equivalent.

#REF! ELEC-8.1.14 Supply of 100 Pair raiser cable for telephone makes 1 Mtrs
Finolex / Delton / Surabi / Polycab.
#REF! ELEC-8.1.15 Supply of 10 Pair telephone Copper wire of makes Finolex / 1 Mtr
Delton / Surabi / Polycab / Nakoda.
#REF! ELEC-8.1.16 Supply of 20 Pair telephone Copper wire of makes Finolex / 1 Mtr
Delton / Surabi / Polycab / Nakoda.
#REF! ELEC-8.1.17 Supply of 50 Pair telephone Copper wire of makes Finolex / 1 Mtr
Delton / Surabi / Polycab.
#REF! ELEC-8.1.18 Supply of 10 pair Telephone distribution box with back mount 1 No
frame, krone connector, powder coated metal body
with lock and key arrangement.
#REF! ELEC-8.1.19 Supply of 20 pair Telephone distribution box with back mount 1 No
frame, krone connector, powder coated metal body with lock
and key arrangement.
#REF! ELEC-8.1.20 Supply of 50 pair Telephone distribution box with back mount 1 No
frame, krone connector, powder coated metal body with lock
and key arrangement.
#REF! ELEC-8.1.21 Supply of 200 pair Telephone distribution box with back 1 No
mount frame, krone connector, powder coated metal body
with lock and key arrangement.
#REF! ELEC-8.1.22 Supply of 6U floor mounting net work rack with power 1 No
spike including all accessories of make HCL / Vall.
#REF! ELEC-8.1.23 Supply of 9U floor mounting net work rack with power 1 No
spike including all accessories of make HCL / Vall.
#REF! ELEC-8.1.24 Supply of 12U floor mounting net work rack with power 1 No
spike including all accessories of make HCL / Vall.
#REF! ELEC-8.1.25 Supply of 15U floor mounting net work rack with power 1 No
spike including all accessories of make HCL / Vall.
#REF! ELEC-8.1.26 Supply of 17U floor mounting net work rack with power 1 No
spike including all accessories of make HCL / Vall.
#REF! ELEC-8.1.27 Supply of 42U floor mounting net work rack with power 1 No
spike including all accessories of make HCL / Vall.
#REF! ELEC-8.1.28 Supply of 6 Core (Indoor/ Out door),Single mode armourd, 1 Mtrs
Optic fibre cable of makes D Link / AMP / Molex / Legrand /
Krone.
#REF! ELEC-8.1.29 Supply of 12 Core (Indoor / Out door), Single mode armourd, 1 Mtrs
Optic fibre cable of makes D Link / AMP / Molex / Legrand /
Krone.
#REF! ELEC-8.1.30 Supply of 6 port fibre distribution unit. (FDU / LIU) loaded 1 No
with couplers etc complete of makes D Link / AMP / Molex
/Legrand / Krone.
#REF! ELEC-8.1.31 Supply of 12 port fibre distribution unit. (FDU / LIU) loaded 1 No
with couplers etc complete of makes D Link / AMP / Molex /
Legrand / Krone.
#REF! ELEC-8.1.32 Supply of Subscriber connector (SC) to SC / LC patch card 1 No
of 1 Mtr length of makes D Link / AMP / Molex /
Legrand / Krone.
#REF! ELEC-8.1.33 Supply of Pigtails for fibre core connectivity of makes D Link / 1 No
AMP / Molex / Legrand / Krone.
#REF! ELEC-8.1.34 Supply of Cat 6 RJ-45 information outlets including Single 1 No
face plate of makes D Link / AMP / Molex / Legrand / Krone.

#REF! RACEWAYS AND JUNCTION BOXES


#REF! ELEC-8.1.35 Supply of 100mm x 38mm G I Raceways of 2mm thick with 1 Mtrs
top cover and required hard ware etc complete.
#REF! ELEC-8.1.36 Supply of 150mm x 38mm G I Raceways of 2mm thick with 1 Mtrs
top cover and required hard ware etc complete.
#REF! ELEC-8.1.37 Supply of 300mm x 38mm G I Raceways of 2mm thick with 1 Mtrs
top cover and required hard ware etc complete.
#REF! ELEC-8.1.38 Supply of 100mm x 25mm G I Raceways of 2mm thick with 1 Mtrs
top cover and required hard ware etc complete.
#REF! ELEC-8.1.39 Supply of 150mm x 25mm G I Raceways of 2mm thick with 1 Mtrs
top cover and required hard ware etc complete.
#REF! ELEC-8.1.40 Supply of 300mm x 25mm G I Raceways of 2mm thick with 1 Mtrs
top cover and required hard ware etc complete.
#REF! ELEC-8.1.41 Supply of 172mm x 52mm G.I. Junction box of 2mm 1 No
thick for direct acces to cables at the inter section of
Raceways.
#REF! ELEC-8.1.42 Supply of 222mm x 52mm G.I. Junction box of 2mm 1 No
thick for direct acces to cables at the inter section of
Raceways.
#REF! ELEC-8.1.43 Supply of 372mm x 52mm G.I. Junction box of 2mm 1 No
thick for direct acces to cables at the inter section of
Raceways.
#REF! 9.1 MISSILLANEOUS ITEMS
#REF! ELEC-9.1.1 TW Seperators / Gutties 100 Nos

#REF! ELEC-9.1.2 Rawl Plugs 100 Nos


#REF! ELEC-9.1.3 U Nails 100 Nos

#REF! ELEC-9.1.4 Alluminium Link Clips 144 Nos

#REF! ELEC-9.1.5 50 mm G.I.Nut and Bolts. 1 Set

#REF! ELEC-9.1.6 63 to 100 mm G.I.Nut and Bolts. 1 Set

#REF! ELEC-9.1.7 50 mm 0 Gauge Nails 1 Doz

#REF! ELEC-9.1.8 63 to 100 mm 0 Gauge Nails 1 Doz

#REF! ELEC-9.1.9 Hard Coke 1 Kg

#REF! ELEC-9.1.10 Salt 1 Kg

#REF! ELEC-9.1.11 PVC Cleats 2 Way 100 Nos

#REF! ELEC-9.1.12 PVC Cleats 4 Way 100 Nos

#REF! ELEC-9.1.13 Binding Wire 1 No

#REF! ELEC-9.1.14 PVC / Cotton Insulation tape Role ( 10 Mtrs) 1 No

#REF! ELEC-9.1.15 C.I.Knob 1 No

#REF! ELEC-9.1.16 Stay tight set (Jum bracket 300 mm) Pair

#REF! ELEC-9.1.17 Stay clamp with bolts and Nuts) 1 Set

#REF! ELEC-9.1.18 L.T.Guy insulator 1 No

#REF! ELEC-9.1.19 12 / 15 MS plain rod fan hook 1 No

#REF! ELEC-9.1.20 19 / 20 mm Steel tube fan down rod 1 Rm

#REF! ELEC-9.1.21 Consealed box PVC / MS with hook for fan 1 No

#REF! ELEC-9.1.22 Coil Earthing 1 No

#REF! ELEC-9.1.23 Cable root Indicators 1 No

#REF! ELEC-9.1.24 40 mm x 40 mm x 6 mm angle iron with I bolt. 1 Set

#REF! ELEC-9.1.25 Mild Steel Items 1 Kg

#REF! ELEC-9.1.26 Acrylic Cover of size 4" x 7" for night lamps. 1 No

#REF! ELEC-9.1.27 TW / PVC Round Blocks 1 No

#REF! ELEC-9.1.28 G.I.Funnel with Mesh 1/2" x 4" 1 No

#REF! ELEC-9.1.29 Asbestos Sheet 1 Sqft

#REF! ELEC-9.1.30 First Aid box 18" x 12" x 8" 1 No

#REF! ELEC-9.1.31 11 KV/22 KV Hand gloves 1 No


ELEC-9.1.32 PVC Insulated copper winding wire of fine quality (per K. G) 1 Kg

ELEC-9.1.33 No. 14 SWG copper wire (per K. G) 1 Kg

#REF! ELEC-9.1.34 Copper plate / Copper strip (Per K.G) 1 Kg

#REF! ELEC-9.1.35 No. 8/10 SWG copper wire (per K.G) 1 Kg

#REF! ELEC-9.1.36 PVC Insulated copper winding wire of fine quality (per K. G) 1 Kg

#REF! ELEC-9.1.37 No. 14 SWG copper wire (per K. G) 1 Kg

#REF! ELEC-9.1.38 Copper winding wire (per K. G) 1 Kg

#REF! ELEC-9.1.39 G.I. Strip / Plate / Wire (per K. G) 1 Kg

#REF! ELEC-9.1.40 Alluminum Bus bars/Strips/accessories 1 Kg

#REF! ELEC-9.1.41 Alluminum winding wire 1 Kg

#REF! ELEC-9.1.42 6.2 Volt series bulb (25 Nos.) 25 Nos

#REF! ELEC-9.1.43 6.2 Volt series bulb with navar plate(25 Nos.) 25 Nos

#REF! ELEC-9.1.44 Supply of Rotating machine 1 No

#REF! ELEC-9.1.45 Supply and fixing of 6mm thick MS Chekered plate. 1 Kg

#REF! ELEC-9.1.46 Supply and fixing of 6mm thick Alluminium Chekered plate. 1 Kg

#REF! ELEC-9.1.47 Copper old winding Wire scrap for 1 Kg 1 Kg

#REF! ELEC-9.1.48 Cement 1 Kg

#REF! ELEC-9.1.49 Hylam Sheet 1 Sqin

#REF! ELEC-9.1.50 Earth work excacvation including all soils for trench, Pole Pit 1 Cum
and Earth Pit.

#REF! ELEC-9.1.51 Cost of Sand 1 Cum

#REF! ELEC-9.1.52 Cost of Bricks 1000 Nos

#REF! ELEC-9.1.53 25mm Nominal Bore light grade G.I.Pipe 1 Mtr

#REF! ELEC-9.1.54 25mm Nominal Bore Medium grade G.I.Pipe 1 Mtr

#REF! ELEC-9.1.55 40mm Nominal Bore light grade G.I.Pipe 1 Mtr

#REF! ELEC-9.1.56 40mm Nominal Bore Medium grade G.I.Pipe 1 Mtr

#REF! ELEC-9.1.57 Drilling of 16 Nos through holes of 12mm dia to G.I pipe 1 No

#REF! ELEC-9.1.58 G.I Nuts, Bolts an Washers each set 1 Set

#REF! ELEC-9.1.59 18" dia 2" thick hume pipe ring 1 No


#REF! ELEC-9.1.60 18" dia 3" hume pipe ring 1 No

#REF! ELEC-9.1.61 2" thick CC cover for hume pipe ring with handle. 1 No

#REF! ELEC-9.1.62 Supply of Saddle / Clamps suitable for fixing 2 Core 4 to 10 100 Nos
Sqmm Cable.

#REF! ELEC-9.1.63 Supply of Saddle / Clamps suitable for fixing 4 Core 4 & 6 100 Nos
Sqmm Cable.

#REF! ELEC-9.1.64 Supply of Saddle / Clamps suitable for fixing 4 Core 10 & 16 100 Nos
Sqmm Cable.

#REF! ELEC-9.1.65 Supply of Saddle / Clamps suitable for fixing 3.5 Core 25 & 35 100 Nos
Sqmm Cable.

#REF! ELEC-9.1.66 Supply of Saddle / Clamps suitable for fixing 3.5 Core 50 100 Nos
Sqmm Cable.

#REF! ELEC-9.1.67 Supply of Saddle / Clamps suitable for fixing 3.5 Core 70 & 95 100 Nos
Sqmm Cable.

#REF! ELEC-9.1.68 Supply of Saddle / Clamps suitable for fixing 3.5 Core 120 to 100 Nos
185 Sqmm Cable.

#REF! ELEC-9.1.69 Supply of Saddle / Clamps suitable for fixing 3.5 Core 240 & 100 Nos
300 Sqmm Cable.

#REF! ELEC-9.1.70 Supply of Saddle / Clamps suitable for fixing 3.5 Core 400 100 Nos
Sqmm Cable.

#REF! ELEC-9.1.71 Supply and fixing of anchor fastner with fan hook/ providing 1 No
MS fan hook with grouting and cement plastering
ELEC-9.1.72 Supply and fixing of PVC synthetic 1 No
elastomer electrically insulated mat with
class A insulation conforming to IS: 15652-
2006 having 2mm thickness upto 3.3KV
ELEC-9.1.73 Supply and fixing of PVC synthetic 1 No
elastomer electrically insulated mat with
Class B insulation conforming to IS: 15652-
2006 having 2.5mm thickness upto 11KV
ELEC-9.1.74 Supply and fixing of PVC synthetic 1 No
elastomer electrically insulated mat with
ClassC insulation conforming to IS: 15652-
2006 having 3mm thickness upto 33KV
ELEC-9.1.75 Supply of round bottom G.I sheet bucket of 1 No
9 Ltrs. Capacity as per IS:2546 made out of
24 gauge GI sheet with extra handle at
bottom duly painted inside and red out side
with printed with FIRE Mark for stand and
hook and filled with sand and arranged to
existing stand or hook. ( MR )

ELEC-9.1.76 Providing floor mounting stand for keeping 1 No


4No of fire bucket 1500mm length, 900mm
height made out of 40x40x6mm angle iron
welded with 4 hooks and duly painted with
one coat of red lead and two coats of
enamel paint

#REF! 10.1 WIRELESS FIRE ALARAM SYSTEM


#REF! ELEC-10.1.1 Supply and fixing of wireless smoke detection control panel of 1 No
28 wireless zones, 2 Hard wired Zones, Tamper Alert, Pass
code protected, RF jamming recognition, diagnostic feature
for RF signal strength between panel and each detector, vent
reporting using PSTN telephone line, dialing upto 4 telephone
numbers, event reporting as per users choice, LCD screen
display, two way voice interaction, battery backup stand by
time up to 12 hrs. (Cease Fire / Visonic / Honeywell /
Secutron) Including transportation, all taxes and all labour
charges etc complete.

#REF! ELEC-10.1.2 Supply and fixing of Wireless Repeater.The wireless repeater 1 No


extends the communication range of detection by relaying
data between receiver and remote wireless transmitter.
(Cease Fire / Visonic / Honeywell / Secutron) Including
transportation, all taxes and all labour charges etc complete.

#REF! ELEC-10.1.3 Supply and fixing of Wireless Siren Strobe external wireless 1 No
siren - a fully supervised power code outdoor (IP55)
wireless Siren and strobe light. Designed for external
installation.Wire - Free connection between control panel and
siren. Convenient rapid no- mess installation. Separate fire
alarm signals, 98db Piezo siren and high power strobe light.
Weather resistant, IP55, 2-way communication for local and
remote diagnostics. Plug-in power supply, NIMH rechargeable
back-up power battery, transmits status, tamper, low- battery,
supervisory and AC loss messages to the control panel, Tri-
State tamper switch identifies screw manipulation removal of
cover or playing from the wall.(Cease Fire / Visonic /
Honeywell / Secutron) Including transportation, all taxes and
all labour charges etc complete.

#REF! ELEC-10.1.4 Supply and fixing of wireless Fully Supervised Smoke 1 No


Detector, Photoelectric detection technology for superior
detection sensitivity , sound and transmitted for smoke,
tamper and low battery, works on power code protocol, easy
programming and enrolling to the control panel, long life 9 volt
alkaline or lithium battery. (Cease Fire / Visonic / Honeywell /
Secutron) Including transportation, all taxes and all labour
charges etc complete.

#REF! 10.2 ADDRESSABLE - FIRE ALARM SYSTEM


#REF! ELEC-10.2.1 Supply, Installation, testing and commissioning of wall 1 No
mounting 10 loop micro processor based analog
addressable fire control panel expandable by minimum 2
additional loops with minimum 80 character LCD display 4
access levels 1000 events, historical logging, flash E-PROM,
240 volts AC Power supply, automatic battery charger, 24V
SLA batteries suitable for operating the entire system
including tack back units and the hooters/strobes for a
minimum of 4 hours in battery condition the panel shall have
suitable power amplifiers for hooter / strobes the panel shall
be capable beeing integrated with the BMS system and shall
include cost of supply, installation of any additional modules
or interfaces required for the same. The panel shall be
completed as per the specification and as required fixing of 10
loop Micro processor based Fire Alarm control panel with
zonal indictions and battery back up as per detailed
specifications. (Makes: Notifier / Edwards).

#REF! ELEC-10.2.2 Supply, Installation, testing and commissioning of wall 1 No


mounting 10 loop micro processor based analog
addressable fire control panel expandable by minimum 2
additional loops with minimum 80 character LCD display 4
access levels 1000 events, historical logging, flash E-
PROM, 240 volts A C Power supply, automatic battery
charger, 24V SLA batteries suitable for operating the entire
system including tack back units and the hooters/strobes for a
minimum of 4 hours in battery condition the panel shall have
suitable power amplifiers for hooter / strobes the panel shall
be capable beeing integrated with the BMS system and shall
include cost of supply, installation of any additional modules
or interfaces required for the same. The panel shall be
completed as per the specification and as required fixing of 10
loop Micro processor based Fire Alarm control panel with
zonal indictions and battery back up as per detailed
specifications.(Makes: Siemens / Morley / Bosch).
#REF! ELEC-10.2.3 Supply, Installation, testing and commissioning of wall 1 No
mounting 8 loop micro processor based analog
addressable fire control panel expandable by minimum
2 additional loops with minimum 80 character LCD
display 4 access levels 1000 events, historical logging,
flash E-PROM, 240 volts A C Power supply, automatic
battery charger, 24V SLA batteries suitable for operating
the entire system including tack back units and the
hooters/strobes for a minimum of 4 hours in battery
condition the panel shall have suitable power amplifiers
for hooter / strobes the panel shall be capable beeing
integrated with the BMS system and shall include cost
of supply, installation of any additional modules or
interfaces required for the same. The panel shall be
completed as per the specification and as required fixing
of 8 loop Micro processor based Fire Alarm control panel
with zonal indictions and battery back up as per detailed
specifications. (Makes: Notifier / Edwards).

#REF! ELEC-10.2.4 Supply, Installation, testing and commissioning of wall 1 No


mounting 8 loop micro processor based analog addressable
fire control panel expandable by minimum 2 additional
loops with minimum 80 character LCD display 4 access
levels 1000 events, historical logging, flash E-PROM, 240
volts A C Power supply, automatic battery charger, 24V SLA
batteries suitable for operating the entire system including
tack back units and the hooters/strobes for a minimum of 4
hours in battery condition the panel shall have suitable power
amplifiers for hooter / strobes the panel shall be capable
beeing integrated with the BMS system and shall include
cost of supply, installation of any additional modules
or interfaces required for the same. The panel shall be
completed as per the specification and as required fixing of 8
loop Micro processor based Fire Alarm control panel with
zonal indictions and battery back up as per detailed
specifications.(Makes: Siemens / Morley / Bosch).
#REF! ELEC-10.2.5 Supply, Installation, testing and commissioning of wall 1 No
mounting 6 loop micro processor based analog
addressable fire control panel expandable by
minimum 2 additional loops with minimum 80
character LCD display 4 access levels 1000 events,
historical logging, flash E-PROM, 240 volts A C Power
supply, automatic battery charger, 24V SLA batteries
suitable for operating the entire system including tack
back units and the hooters/strobes for a minimum of 4
hours in battery condition the panel shall have suitable
power amplifiers for hooter / strobes the panel shall be
capable beeing integrated with the BMS system and shall
include cost of supply, installation of any
additional modules or interfaces required for the
same. The panel shall be completed as per the
specification and as required fixing of 6 loop Micro
processor based Fire Alarm control panel with zonal
indictions and battery back up as per detailed
specifications. (Makes: Notifier / Edwards).

#REF! ELEC-10.2.6 Supply, Installation, testing and commissioning of wall 1 No


mounting 6 loop micro processor based analog addressable
fire control panel expandable by minimum 2 additional
loops with minimum 80 character LCD display 4 access
levels 1000 events, historical logging, flash E-PROM, 240
volts A C Power supply, automatic battery charger, 24V SLA
batteries suitable for operating the entire system including
tack back units and the hooters/strobes for a minimum of 4
hours in battery condition the panel shall have suitable power
amplifiers for hooter / strobes the panel shall be capable
beeing integrated with the BMS system and shall include
cost of supply, installation of any additional modules
or interfaces required for the same. The panel shall be
completed as per the specification and as required fixing of 6
loop Micro processor based Fire Alarm control panel with
zonal indictions and battery back up as per detailed
specifications. (Makes: Siemens / Morley / Bosch).
#REF! ELEC-10.2.7 Supply, Installation, testing and commissioning of wall 1 No
mounting 4 loop micro processor based analog addressable
fire control panel expandable by minimum 2 additional loops
with minimum 80 character LCD display 4 access levels 1000
events, historical logging, flash E-PROM, 240 volts AC Power
supply, automatic battery charger, 24V SLA batteries suitable
for operating the entire system including tack back units and
the hooters/strobes for a minimum of 4 hours in battery
condition the panel shall have suitable power amplifiers for
hooter / strobes the panel shall be capable beeing integrated
with the BMS system and shall include cost of supply,
installation of any additional modules or interfaces required
for the same. The panel shall be completed as per the
specification and as required fixing of 4 loop Micro processor
based Fire Alarm control panel with zonal indictions and
battery back up as per detailed specifications.(Makes:
Notifier / Edwards).

#REF! ELEC-10.2.8 Supply, Installation, testing and commissioning of wall 1 No


mounting 4 loop micro processor based analog addressable
fire control panel expandable by minimum 2 additional loops
with minimum 80 character LCD display 4 access levels
1000 events, historical logging, flash E-PROM, 240 volts A
C Power supply, automatic battery charger, 24V SLA batteries
suitable for operating the entire system including tack back
units and the hooters/strobes for a minimum of 4 hours in
battery condition the panel shall have suitable power
amplifiers for hooter / strobes the panel shall be capable
beeing integrated with the BMS system and shall include cost
of supply, installation of any additional modules or interfaces
required for the same. The panel shall be completed as per
the specification and as required fixing of 4 loop Micro
processor based Fire Alarm control panel with zonal indictions
and battery back up as per detailed specifications. (Makes:
Siemens / Morley / Bosch).

#REF! ELEC-10.2.9 Supply, Installation, testing and commissioning of wall 1 No


mounting 2 loop micro processor based analog addressable
fire control panel expandable by minimum 2 additional
loops with minimum 80 character LCD display 4 access
levels 1000 events, historical logging, flash E-PROM, 240
volts A C Power supply, automatic battery charger, 24V SLA
batteries suitable for operating the entire system including
tack back units and the hooters/strobes for a minimum of 4
hours in battery condition the panel shall have suitable power
amplifiers for hooter / strobes the panel shall be capable
beeing integrated with the BMS system and shall include
cost of supply, installation of any additional modules
or interfaces required for the same. The panel shall be
completed as per the specification and as required fixing of 2
loop Micro processor based Fire Alarm control panel with
zonal indictions and battery back up as per detailed
specifications.(Makes: Notifier / Edwards).
#REF! ELEC-10.2.10 Supply, Installation, testing and commissioning of wall 1 No
mounting 2 loop micro processor based analog addressable
fire control panel expandable by minimum 2 additional
loops with minimum 80 character LCD display 4 access
levels 1000 events, historical logging, flash E-PROM, 240
volts A C Power supply, automatic battery charger, 24V SLA
batteries suitable for operating the entire system including
tack back units and the hooters/strobes for a minimum of 4
hours in battery condition the panel shall have suitable power
amplifiers for hooter / strobes the panel shall be capable
beeing integrated with the BMS system and shall include
cost of supply, installation of any additional modules
or interfaces required for the same. The panel shall be
completed as per the specification and as required fixing of 2
loop Micro processor based Fire Alarm control panel with
zonal indictions and battery back up as per detailed
specifications.(Makes: Siemens / Morley / Bosch).

#REF! ELEC-10.2.11 Supply, Installation, testing and commissioning of wall 1 No


mounting 1 loop micro processor based analog
addressable fire control panel expandable by
minimum 2 additional loops with minimum 80
character LCD display 4 access levels 1000 events,
historical logging, flash E-PROM, 240 volts A C Power
supply, automatic battery charger, 24V SLA batteries
suitable for operating the entire system including tack
back units and the hooters/strobes for a minimum of 4
hours in battery condition the panel shall have suitable
power amplifiers for hooter / strobes the panel shall be
capable beeing integrated with the BMS system and shall
include cost of supply, installation of any
additional modules or interfaces required for the
same. The panel shall be completed as per the
specification and as required fixing of 1 loop Micro
processor based Fire Alarm control panel with zonal
indictions and battery back up as per detailed
specifications.(Makes: Notifier / Edwards).
#REF! ELEC-10.2.12 Supply, Installation, testing and commissioning of wall 1 No
mounting 1 loop micro processor based analog addressable
fire control panel expandable by minimum 2 additional loops
with minimum 80 character LCD display 4 access levels 1000
events, historical logging, flash E-PROM, 240 volts A C Power
supply, automatic battery charger, 24V SLA batteries suitable
for operating the entire system including tack back units and
the hooters/strobes for a minimum of 4 hours in battery
condition the panel shall have suitable power amplifiers for
hooter / strobes the panel shall be capable beeing integrated
with the BMS system and shall include cost of supply,
installation of any additional modules or interfaces required
for the same. The panel shall be completed as per the
specification and as required fixing of 1 loop Micro processor
based Fire Alarm control panel with zonal indictions and
battery back up as per detailed specifications.(Makes:
Siemens / Morley / Bosch).

#REF! ELEC-10.2.13 Supply, Installation, testing and commissioning of intellegent 1 No


analogue addressable Repeater panel including the cost of
mounting accessories complete as per specification as
required. (Makes: Notifier / Edwards).
#REF! ELEC-10.2.14 Supply, Installation, testing and commissioning of intellegent 1 No
analogue addressable Repeater panel including the cost of
mounting accessories complete as per specification as
required. (Makes: Siemens / Morley/ Bosch).

#REF! ELEC-10.2.15 Supply and fixing of addressable wall mounting strobes cum 1 No
hooters including the cost of mounting accessories complete
as per specifications and as required including testing and
commissioning. (Makes: Notifier / Edwards).

#REF! ELEC-10.2.16 Supply and fixing of addressable wall mounting strobes cum 1 No
hooters including the cost of mounting accessories complete
as per specifications and as required including testing and
commissioning. (Makes: Siemens / Morley Bosch).

#REF! ELEC-10.2.17 Supply and installation of addressable analogue manual call 1 No


point with resetable flexible element to initiate alaram
including the cost of mounting accessories etc.complete.
(Makes: Notifier / Edwards).
#REF! ELEC-10.2.18 Supply and installation of addressable analogue manual call 1 No
point with resetable flexible element to initiate alaram
including the cost of mounting accessories etc. complete.
(Makes: Siemens / Morley / Bosch).
#REF! ELEC-10.2.19 Supply and instllation of intallegent analogue addressable 1 No
photo electric smoke detector including cost of base plate
etc., complete as per specification with required fittings and
accessories. (Makes: Notifier / Edwards).
#REF! ELEC-10.2.20 Supply and instllation of intallegent analogue addressable 1 No
photo electric smoke detector including cost of base plate
etc., complete as per specification with required fittings and
accessories. (Makes: Siemens / Morley / Bosch).
#REF! ELEC-10.2.21 Supply and installation of intallegent analogue addressable 1 No
rate of rise cum fixed temparature heat detectors including
the cost of base plate. 75mm dia MS outlet box for fixing of
the detector base, mounting accessories etc., complete as
per specifications and as required. (Makes: Notifier
/Edwards).

#REF! ELEC-10.2.22 Supply and installation of intallegent analogue addressable 1 No


rate of rise cum fixed temparature heat detectors including the
cost of base plate.75mm dia MS outlet box for fixing of the
detector base, mounting accessories etc., complete as per
specifications and as required. (Makes: Siemens / Morley /
Bosch).

#REF! ELEC-10.2.23 Supply and installation of intalligent analogue addressable 1 No


multi criterion detectors below false ceiling/on ceiling including
the cost of base plate.75mm dia MS outlet box for fixing of the
detector base, mounting accessories etc., complete as per
specifications and as required. (Makes: Notifier / Edwards).

#REF! ELEC-10.2.24 Supply and installation of intalligent analogue addressable 1 No


multi criterion detectors below false ceiling/on ceiling including
the cost of base plate.75mm dia MS outlet box for fixing of
the detector base, mounting accessories etc., complete as
per specifications and as required. (Makes:Siemens / Morley /
Bosch).

#REF! ELEC-10.2.25 Supply and Installation of Intalligent analogue addressable 1 No


Control Modules including the cost of mounting accessories
complete as per specifications and as required.(Makes:
Notifier / Edwards).
#REF! ELEC-10.2.26 Supply and Installation of Intalligent analogue addressable 1 No
Control Modules including the cost of mounting accessories
complete as per specifications and as required. (Makes:
Siemens / Morley / Bosch).
#REF! ELEC-10.2.27 Supply and Installation of Intalligent analogue addressable 1 No
monitor modules including the cost of mounting accessories
complete as per specifications and as required. (Makes:
Notifier / Edwards).
#REF! ELEC-10.2.28 Supply and Installation of Intalligent analogue addressable 1 No
monitor modules including the cost of mounting accessories
complete as per specifications and as required. (Makes:
Siemens / Morley / Bosch).
#REF! ELEC-10.2.29 Supply and Installation of Intalligent analogue addressable 1 No
fault isolator modules including the cost of mounting
accessories complete as per specifications and complete as
required. (Makes: Notifier / Edwards).
#REF! ELEC-10.2.30 Supply and Installation of Intalligent analogue addressable 1 No
fault isolator modules including the cost of mounting
accessories complete as per specifications and complete as
required. (Makes: Siemens / Morley / Bosch).

#REF! 10.3 CONVENTIONAL - FIRE ALARM SYSTEM


#REF! ELEC-10.3.1 Supply, Installation, testing and commissioning of 1 No
conventional Micro processor based Fire Alarm panel with 2
zone,12V SMF batteries etc., complete with all standard
accessories. (Makes: System Censor / Ravel / Pinnacle)
#REF! ELEC-10.3.2 Supply, Installation, testing and commissioning of 1 No
conventional Micro rocessor based Fire Alarm panel with 4
zone, 12V SMF batteries etc., complete with all standard
accessories. (Makes: System Censor / Ravel / Pinnacle)

#REF! ELEC-10.3.3 Supply, Installation, testing and commissioning of 1 No


conventional Micro processor based Fire Alarm panel with 6
zone, 12V SMF batteries etc., complete with all standard
accessories. (Makes: System Censor / Ravel / Pinnacle)

#REF! ELEC-10.3.4 Supply, Installation, testing and commissioning of 1 No


conventional Micro processor based Fire Alarm panel with 8
zone, 12V SMF batteries etc., complete with all standard
accessories. (Makes: System Censor / Ravel / Pinnacle)

#REF! ELEC-10.3.5 Supply, Installation, testing and commissioning of 1 No


conventional Micro processor based Fire Alarm panel with
10 zone, 12V SMF batteries etc., complete with all standard
accessories. (Makes: System Censor / Ravel / Pinnacle)

#REF! ELEC-10.3.6 Supply, Installation, testing and commissioning of 1 No


conventional Micro processor based Fire Alarm panel with
12 zone, 12V SMF batteries etc., complete with all standard
accessories. (Makes: System Censor / Ravel / Pinnacle)

#REF! ELEC-10.3.7 Supply, Installation, testing and commissioning of 1 No


conventional Micro processor based Fire Alarm panel with
14 zone, 12V SMF batteries etc., complete with all standard
accessories. (Makes: System Censor / Ravel / Pinnacle)

#REF! ELEC-10.3.8 Supply and installation of Repeater panel including the cost 1 No
of mounting accessories complete as per specifications and
as required. (Makes: System Censor / Ravel / Pinnacle)

#REF! ELEC-10.3.9 Supply and installation of duel tone electronic hooter of 1 No


85dB including the cost of mounting accessories
complete as per specifications and as required.
#REF! ELEC-10.3.10 Supply and installation of dust and vermin proof manual call 1 No
point to initiate audio visual alarm including the cost of
mounting accessories complete as per specifications and as
required.
#REF! ELEC-10.3.11 Supply and installation of response indicators for above 1 No
false ceiling detectors.
#REF! ELEC-10.3.12 Supply and installation of plug - in type multi criterion 1 No
detectors including the cost of base plate. 75mm dia
M.S. outlet box for fixing of the detector base.
Mounting accessories etc., complete as per specifications as
required. (Makes: System Censor / Ravel / Pinnacle)

#REF! ELEC-10.3.13 Supply and installation of plug -in type photo electric smoke 1 No
detectors including the cost of base plate. 75mm dia MS
outlet box for fixing of the detector base. Mounting
accessories etc complete and as per specifications and
as required. (Makes: System Censor / Ravel / Pinnacle)
#REF! ELEC-10.3.14 Supply and installation of plug -in type rate of rise cum fixed 1 No
temperature heat detectors including the cost of base
plate.75mm dia MS outlet box for fixing of the detector base,
mounting accessories etc., complete as per specifications
and as required. (Makes: System Censor /Ravel /Pinnacle)

#REF! 10.4 POWDER BASED FIRE EXTINGUISHERS


#REF! ELEC-10.4.1 Supply and fixing of ABC stored pressure 1 No
squeeze grip type fire extinguishers, 9 kg
capacity, IS:15683 : 2006, filled with ABC
Mono Ammonium Phosphate base powder-
90 complete with discharge hose and wall
mounting bracket, 2mm Mild Steel, EPDM
Rubbers, Pressure Guage, which work
effectively on all class of fires (A, B, C &
Electrical fires) with 5 years warranty
Including transportation, all taxes and all
labour charges etc complete.
Makes : Cease Fire / Minimax

#REF! ELEC-10.4.2 Supply and fixing of ABC stored pressure 1 No


squeeze grip type fire extinguishers, 9 kg
capacity, IS:15683 : 2006, filled with ABC
Mono Ammonium Phosphate base powder-
90 complete with discharge hose and wall
mounting bracket, 2mm Mild Steel, EPDM
Rubbers, Pressure Guage, which work
effectively on all class of fires (A, B, C &
Electrical fires) with 5 years warranty
Including transportation, all taxes and all
labour charges etc complete.
Makes : Safex / Kenex / Bharat / Reliance

#REF! ELEC-10.4.3 Supply and fixing of ABC Powder MAP 4 1 No


Kg Fire extinguisher Mono ammonium
phosphate power 90, stored pressure type,
IS 15683 : 2006, pressure gauge gross wt.
6.9 kg, empty wt.2.9 kg, can Ht.440mm,
Diameter 140mm, Discharge time less than
13 sec, controllable discharge mechanism,
range min. 4 mts applicable on classes A,B,
C & electrically started fires, A- rating 3A,
B-rating 34B, can construction: Deep
drawn Co2 mig welding, wall construction:
Forging & Machining, internal coating of
can: Epoxy power coating, External coating
of Can:Epoxy polyster powder coating,
sheet metal thickness:1.60mm, Helium
leakage detection tested, ISI & CE
approved with 5 years warranty (Cease Fire
/ Minimax make) Including transportation,
all taxes and all labour charges etc
complete.
Makes : Cease Fire / Minimax
#REF! ELEC-10.4.4 Supply and fixing of ABC Powder MAP 4 1 No
Kg Fire extinguisher Mono ammonium
phosphate power 90, stored pressure type,
IS 15683 : 2006, pressure gauge gross wt.
6.9 kg, empty wt.2.9 kg, can Ht.440mm,
Diameter 140mm, Discharge time less than
13 sec, controllable discharge mechanism,
range min. 4 mts applicable on classes A,B,
C & electrically started fires, A- rating 3A,
B-rating 34B, can construction: Deep
drawn Co2 mig welding, wall construction:
Forging & Machining, internal coating of
can: Epoxy power coating, External coating
of Can:Epoxy polyster powder coating,
sheet metal thickness:1.60mm, Helium
leakage detection tested, ISI & CE
approved with 5 years warranty (Cease Fire
/ Minimax make) Including transportation,
all taxes and all labour charges etc
complete.
Makes : Safex / Kenex / Bharat / Reliance

#REF! ELEC-10.4.5 Supply and fixing of ABC Powder MAP 2 1 No


Kg Fire extinguisher Mono ammonium
phosphate power 90, stored pressure type,
IS 15683 : 2006, pressure gauge gross wt.
3.6 kg, empty wt.1.6 kg, can Ht.344mm,
Diameter 108mm, Discharge time less than
8 sec, controllable discharge mechanism,
range min. 2 mts applicable on classes A,B,
C electrically started fires, A- rating 2A, Brating
21B, can construction: Deep drawn
Co2 mig welding, wall construction: Forging
& Machining, internal coating of can: Epoxy
power coating, External coating of
Can:Epoxy polyster powder coating, sheet
metal thickness:1.60mm, Helium leakage
detection tested, insta - alert, ISI & CE
approved with 5 years warranty (Cease Fire
/ Minimax make) Including transportation,
all taxes and all labour charges etc
complete.
Makes : Cease Fire / Minimax
#REF! ELEC-10.4.6 Supply and fixing of ABC Powder MAP 2 1 No
Kg Fire extinguisher Mono ammonium
phosphate power 90, stored pressure type,
IS 15683 : 2006, pressure gauge gross wt.
3.6 kg, empty wt.1.6 kg, can Ht.344mm,
Diameter 108mm, Discharge time less than
8 sec, controllable discharge mechanism,
range min. 2 mts applicable on classes A,B,
C electrically started fires, A- rating 2A, Brating
21B, can construction: Deep drawn
Co2 mig welding, wall construction: Forging
& Machining, internal coating of can: Epoxy
power coating, External coating of
Can:Epoxy polyster powder coating, sheet
metal thickness:1.60mm, Helium leakage
detection tested, insta - alert, ISI & CE
approved with 5 years warranty (Cease Fire
/ Minimax make) Including transportation,
all taxes and all labour charges etc
complete.
Makes : Safex / Kenex / Bharat / Reliance

#REF! ELEC-10.4.7 Supply and fixing of Ceiling Mounted ABC 1 No


MAP 90, 5 Kg stored pressure type,
pressure gauge, Gross Wt.7.7 kg, Empty
Wt.2.7 kg, Can Ht264mm , Dia 240mm,
Discharge time : less than 8 sec, IS 15683 :
2006 Auto discharge mechanism on
temperature rise, Applicable on A,B,C, &
Electrically - started fires, Can Construction:
Forging & Machining, Internal coating of
Can: Epoxy Power coating, External
Coating of Can: Epoxy Polyster powder
coating, sheet metal thickness:1.60mm ,
Helium leakage detection tested, ISI
approved with 5 years warranty (Cease Fire
/ Minimax make) Including transportation,
all taxes and all labour charges etc
complete.
Makes : Cease Fire / Minimax

#REF! ELEC-10.4.8 Supply and fixing of Ceiling Mounted ABC 1 No


MAP 90, 5 Kg stored pressure type,
pressure gauge, Gross Wt.7.7 kg, Empty
Wt.2.7 kg, Can Ht264mm , Dia 240mm,
Discharge time : less than 8 sec, IS 15683 :
2006 Auto discharge mechanism on
temperature rise, Applicable on A,B,C, &
Electrically - started fires, Can Construction:
Forging & Machining, Internal coating of
Can: Epoxy Power coating, External
Coating of Can: Epoxy Polyster powder
coating, sheet metal thickness:1.60mm ,
Helium leakage detection tested, ISI
approved with 5 years warranty (Cease Fire
/ Minimax make) Including transportation,
all taxes and all labour charges etc
complete.
Makes : Safex / Kenex / Bharat / Reliance

10.5 CLEAN AGENT FIRE EXTINGUISHERS


#REF! ELEC-10.5.1 Supply and fixing of 2 Kg Fire exitinguisher 1 No
Clean Agent HCFC 123, Stored pressure
type, IS 15683 : 2006 pressure guage,
gross weight 3.7Kg empty weight 1.7 Kg,
can weight 344mm, Diameter 108mm,
discharge time minimum 8 secs,
controllable discharge mechanism, range
minimum 2 meters, applicable on class
A,B,C and electrically started Fire, A rating
1A, B rating 21B, can construction: Deep
drawn & CO2 mig welded, Valve
construction: Forging & Machining, Internal
coating of Can: Epoxy powder coating,
External coating of can: Epoxy polyster
powder coating, sheet metal thickness: 1.60
mm, Helium leak detection tested, ISI & CE
approved, 5 Years warranty.
Makes : Cease Fire / Minimax

ELEC-10.5.2 Supply and fixing of 2 Kg Fire exitinguisher 1 No


Clean Agent HCFC 123, Stored pressure
type, IS 15683 : 2006 pressure guage,
gross weight 3.7Kg empty weight 1.7 Kg,
can weight 344mm, Diameter 108mm,
discharge time minimum 8 secs,
controllable discharge mechanism, range
minimum 2 meters, applicable on class
A,B,C and electrically started Fire, A rating
1A, B rating 21B, can construction: Deep
drawn & CO2 mig welded, Valve
construction: Forging & Machining, Internal
coating of Can: Epoxy powder coating,
External coating of can: Epoxy polyster
powder coating, sheet metal thickness: 1.60
mm, Helium leak detection tested, ISI & CE
approved, 5 Years warranty.
Makes : Safex / Kenex / Bharat.

#REF! ELEC-10.5.3 Supply and fixing of 4 Kg Fire exitinguisher 1 No


Clean Agent HCFC 123, Stored pressure
type, IS 15683 : 2006, pressure guage,
gross weight 6.9Kg empty weight 2.9 Kg,
can hight 440mm, Diameter 140mm,
discharge time minimum 8 secs,
controllable discharge mechanism, range
minimum 2 meters, applicable on class
A,B,C and electrically started Fire, A rating
1A, B rating 21B, can construction: Deep
drawn & CO2 mig welded, Valve
construction: Forging & Machining, Internal
coating of Can: Epoxy powder coating,
External coating of can: Epoxy polyster
powder coating, sheet metal thickness: 1.60
mm, Helium leak detection tested, ISI & CE
approved 5 Years warranty.
Makes : Cease Fire / Minimax
ELEC-10.5.4 Supply and fixing of 4 Kg Fire exitinguisher
Clean Agent HCFC 123, Stored pressure
type, IS 15683 : 2006, pressure guage,
gross weight 6.9Kg empty weight 2.9 Kg,
can hight 440mm, Diameter 140mm,
discharge time minimum 8 secs,
controllable discharge mechanism, range
minimum 2 meters, applicable on class
A,B,C and electrically started Fire, A rating
1A, B rating 21B, can construction: Deep
drawn & CO2 mig welded, Valve
construction: Forging & Machining, Internal
coating of Can: Epoxy powder coating,
External coating of can: Epoxy polyster
powder coating, sheet metal thickness: 1.60
mm, Helium leak detection tested, ISI & CE
approved 5 Years warranty.
Makes : Safex / Kenex / Bharat.

#REF! ELEC-10.5.5 Supply & Fixing of 4.5Kg, CO2 Type Fire 1 No


Extinguisher, Trolley Mounted, Easy Weight
Management, Used Unused Mechanism,
Squeeze Grip, Gross Weight 19.1 Kg,
Empty Weight 14.6 Kg, Can Height 860MM,
Diameter 140MM, Discharge time minimum
13 Secs, Controllable discharge
mechanism, Range minimum 2 Meters,
Applicable on Class B,C & electrically
started Fire, B Rating 13B, Can
Construction : Hot Spinning / Forging, Valve
Construction : Forging & Machining,
Internal Coating of Can : Not Applicable,
External Coating of Can : Spray Painting,
Sheet metal thickness : 4.5MM, ISI & CE
Approved, 2 Year Warranty Including
transportation, all taxes and all labour
charges etc complete.
Makes : Cease Fire / Minimax

ELEC-10.5.6 Supply & Fixing of 4.5Kg, CO2 Type Fire 1 No


Extinguisher, Trolley Mounted, Easy Weight
Management, Used Unused Mechanism,
Squeeze Grip, Gross Weight 19.1 Kg,
Empty Weight 14.6 Kg, Can Height 860MM,
Diameter 140MM, Discharge time minimum
13 Secs, Controllable discharge
mechanism, Range minimum 2 Meters,
Applicable on Class B,C & electrically
started Fire, B Rating 13B, Can
Construction : Hot Spinning / Forging, Valve
Construction : Forging & Machining,
Internal Coating of Can : Not Applicable,
External Coating of Can : Spray Painting,
Sheet metal thickness : 4.5MM, ISI & CE
Approved, 2 Year Warranty Including
transportation, all taxes and all labour
charges etc complete.
Makes : Safex / Kenex / Bharat / Reliance
#REF! ELEC-10.5.7 Supply and fixing of Escape signage boards in Rigid Photo 1 No
luminecent based glow in Dark rigid sheet with high intensity
luminous properties with specificaiton of Cease Fire or its
equivalent make Model-1ES01
#REF! ELEC-10.5.8 Supply and fixing of Cease fire or its equivalent Escape 1 No
gear Mild Steel box size 425mmx360mmx140mm Epoxy
powder coated to protect it from Weathering , smoke hood
tested to Eupropean Standard EN 403 1993-S known to
reduce Carbon Monoxide, propend(acrloein), hydrogen
chloride, hydrogen Cyanide and Solid and liquid toxic
particles to manageable level for atleast 15 minutes shall
with stand tempeartures upto 80 degrees single use only
Fire Blanket size 1.2m x1.8m used to cover any vessel
containing used to Extinguish a clothing fire wrap blanket
around the victim.

#REF! ELEC-10.5.9 Supply and fixing of 4Nos of 9 Ltrs capacity round bottom 1 Set
sand buckets along with bucket sand, Fire buckets with
round bottom type enamel painted, white inside & red out
side and letter FIRE inblack out side & Handle with
mounting bracket.
#REF! ELEC-10.5.10 Supply anmd fixing of Fire bucket stand fabricated by 1 Set
M.S. angles to install for two numbers of buckets as per local
fire officers standards.
10.6 WATER MIST FIRE EXTINGUISHERS
ELEC-10.6.1 Extinguisher : Gross Weight – 23.9 kg.,
Weight of the empty firefighting system
without compressed air bottle and bottle
valve- 14.9 kg., Can Height – 560
MM,Diameter – 204MM, Weight of the gun-
1.9kg, Nominal charge- 9 Ltr., Recoil –
approx. 10N, Extinguishing Media Flow –
0.23 L/ sec, Water Discharge Hose – 13
MM, Discharge time minimum 25 Secs,
Range minimum 10 Meters, Compressed
Air to Gun – 10 MM, Applicable on Class A,
B, C & Electrically started Fires, ARating-
27A, BRating-233B, Compressed air bottle
(volume/pressure) - 2L / 300bar, Operating
pressure(dynamic)-approx 5.0 bar, Lancing
distance of the extinguishing agent-in spray
Approx. 7.0 m, in jet mode Approx, 12.0 m.
Operation time- approx 40 sec,
Extinguishing enhancement agent- Foam
Additive, CE and ERDA approved, Sheet
Metal Thickness – 1.5MM, 1 Year
Warranty.
Makes: Cease Fire or Equivalent

AEROSOL GENERATION SYSTEM (AGS)


AND FIRE EXTINGUISHERS
ELEC-10.6.2 Supply, installation, testing and
commissioning of Addressable Control
panel for AGS system with monitoring
system and provision of interactive TFT
color Graphic Display with touch Screen
Control and shall have built in feature of
Mimic software which works on a Android
based technology and a facility to show the
layout location of the installation area and
prescribed location of the devices during
the fire accident. shall have minimum two
level password protection. Shall have alert
indication for missing device, contaminated
device. The control panel shall have realtime
clock (RTC) indicate time, date, month
& year and along with a provision of
Ethernet based circuit as if required.Makes : SALAMANDRA /
SEAARA / AGS

ELEC-10.6.3 Supply, installation, testing and


commissioning of Addressable Multi sensor
with integrated smoke sensing chamber
and heat sensing element. Addressable
smoke detector shall operate on light
scatter principle. The build-up of dirt or
similar contamination on the sensing
chamber shall be continually monitored by
control panel, when it exceeds
predetermined level; the panel has to
indicate that the detector is in need of
servicing. The detector shall have an
integral microprocessor capable of making
alarm decision based on alarm level set.
The Obs/ft should be 0.5 obs/ft. The
detector shall blink when the detector is
addressed and glow steady on alarm. The
detector shall have provision to alter the
sensitivity from the panel. The detector
shall have electronic free base. The
detector and base construction shall be
made of polycarbonate plastic. The detector
shall be capable of reading from the control
panel, i.e. health of the detector, alarm level
setting. Latching the detector, isolating the
detector from the control panel shall be
possible. The detector shall preferably have
twin LED’s for 360 viewing angle.
1 No 2375.00
Makes : SALAMANDRA / SEAARA / AGS
ELEC-10.6.4 Supply, installation, testing and
commissioning of addressable Loop
Powered Sounder with integral beacon
within horn using high intensity LED
technology. The sounder beacon shall work
with loop power. No separate power supply
with cable shall be used. The sounder
beacon shall be addressable type. It shall
have electronic addressing. No DIP/DIL
switches are permitted for address setting
in order to avoid unauthorized setting. The
construction of the sounder beacon shall be
made of polycarbonate plastic. The sounder
beacon sound pressure level shall be 85 dB
at 10ft.
1 No 2755.00
Makes : SALAMANDRA / SEAARA / AGS

ELEC-10.6.5 Supply, installation, testing and


commissioning of addressable Control
Module with built-in LED. The LED shall
blink when it is addressed and it shall glow
steady when it is actuated and it should
have principle of working with NC/NO relay
circuit. It should have a cross zoning facility
with a inbuilt sounder. The control module
shall have electronic addressing. The
control contact rating shall be a minimum of
2 amps @ 24V DC (Resistive). The control
module shall operate from SLC loop power.
No external power/cable shall be used.
1 No 3135.00
Makes : SALAMANDRA / SEAARA / AGS

ELEC-10.6.6 Supply and installation of manually


operated suppression system using Aerosol
Generator System for all classes of fire with
active substance of 3.3. Kg and does
cooling effect with no re-ignition. The
product with minimum life of 15 years and
no maintenance. The discharge time should
be 25 sec and has net weight of 4.6 kg and
has a capacity to cover 60 m³ and shall be
confirmed to NFPA 2010 and has other
national and international certificates
ELEC-10.6.7 Supply of Auto Detection and Suppression
System using Aerosol Generator System
with required fittings as per standard
composition for all classes of fire, With a
provision to connect to detect smoke and
heat with a obt/ft of 0.5 and flexibility of
adjusting it for a temperature of
57/68/93/141 degree centigrade as per the
site environment. The product Min Life
shall be 15 years and no Maintenance. The
Discharge time should be 78 sec. The
Generator with a net weight of 10 kg Active
Substance of 3.25 kg. and has diameter
220mm and height 220mm The Generator
is suitable for Server Room, Electrical
Storage and technical appliances, important
documents area & etc Makes : SALAMANDRA / SEAARA /
AGS

ELEC-10.6.8 Supply of Auto Detection and


Suppression System using Dry Sprinkler
Generator as per standard composition for
all classes of fire, with a provision to
connect to detect smoke and heat with a
obt/ft of 0.5 and flexibility of adjusting it for a
temperature of 57/68/93/141 degree
centigrade as per the site environment. The
product Min Life shall be 15 years and no
Maintenance. The Discharge time should
be 21 sec. The Generator has a net weight
of 1.2 kg. Active Substance of 0.3 kg and
has diameter 20mm and height 135mm.
The Generator is suitable for Server Room,
Electrical Storage and technical appliances,
important documents area & etc Makes : SALAMANDRA /
SEAARA / AGS

ELEC-10.6.9 Supply of Auto Detection and Suppression


System using Aerosol Generator System
as per standard composition with required
fittings for all classes of fire, with a provision
to connect to detect smoke and heat with a
obt/ft of 0.5 and flexibility of adjusting it for a
temperature of 57/68/93/141 degree
centigrade as per the site environment. The
product Min Life shall be 15 years and no
Maintenance. The Discharge time should
be 50 sec. The Generator has a net weight
of 4.5 kg. Active Substance of 1.4 kg and
has diameter 40mm and height 187mm.
The Generator is suitable for Server Room,Electrical Storage
and technical appliances,
important documents area & etc. Makes : SALAMANDRA /
SEAARA / AGS
ELEC-10.6.10 Supply of Aerosol Heat Starter Sprinkler
used for Auto Detection and Suppression
System for Aerosol Generator System for
all Class of Fire. The heat Starter Sprinkler
has various starter capacity, which ranges
from +50c to +163c. The starter can cover
up to 18 m2. The product Min Life shall
be15 years. The output power from the
Starter is 3v and current 0.6A and operates
at a temperature range of - 50c to +80c.
The Starter Sprinkler is suitable for Server
Room, Electrical Storage and technical
appliances, Important documents area etc. Makes :
SALAMANDRA / SEAARA / AGS

#REF! 10.7 FIRE HYDRANT AND SPRINKLER SYSTEM


#REF! ELEC-10.7.1 Supplying, installation, testing and commissioning of electric 1 Set
driven main fire pump suitable for automatic operation and
consisting of following complete in allrespect as required

#REF! a) Horizontal type, multistage, centrifugal, split casing pump


of cast iron body & bronze impeller with stainless steel
shaft, mechanical seal to ensure a minimum pressure of
3.5Kg / sq.cm. at highest and farthest outlet at specified
flow of 1620 lpm at 56 Mtr. head conforming to IS 1520

#REF! b)Suitable HP SQ cage induction motor, TEFC, synchronous


speed 1500 RPM, suitable for operation on 415Volts, 3 phase
50 Hz. AC with IP 55 protection for enclosure, horizontal foot
mounted type with Class-'F' insulation, conforming to IS 325

#REF! c) M.S. Fabricated common base plate, coupling, coupling


guard, foundation bolts etc as required.
#REF! d) Suitable cement concrete foundation duly plastered with
anti vibration pads. Makes of Pumps: Kirloskar /
Mather&Platt. Makes of Motors: Siemens/ ABB/ Kirloskar

#REF! ELEC-10.7.2 Supplying , installation, testing and commissioning of electric 1 Set


driven main fire pump suitable for automatic operation and
consisting of following : complete in all respect as required

#REF! a) Horizontal type, multistage, centrifugal, split casing pump of


cast iron body & bronze impeller with stainless steel
shaft, mechanical seal to ensure a minimum pressure of 3.5
Kg / sq.cm. at highest and farthest outlet at specified flow
of 2280 lpm at 70 Mtr. head conforming to IS 1520

#REF! b)Suitable HP SQ cage induction motor, TEFC, synchronous


speed 1500 RPM, suitable for operation on 415Volts, 3 phase
50 Hz. AC with IP 55 protection for enclosure, horizontal foot
mounted type with Class-'F' insulation, conforming to IS-325

#REF! c)M.S. Fabricated common base plate, coupling, coupling


guard,foundation bolts etc as required.
#REF! d) Suitable cement concrete foundation duly plastered with
anti vibration pads. Makes of Pumps: Kirloskar / Mather &
Platt. Makes of Motors: Siemens/ ABB/ Kirloskar
#REF! ELEC-10.7.3 Supplying ,installation, testing and commissioning of electric 1 Set
driven main fire pump suitable for automatic operation and
consisting of following: complete in all respect as required.

#REF! a) Horizontal type, multistage, centrifugal, split casing pump of


cast iron body & bronze impeller with stainless steel
shaft, mechanical seal to ensure a minimum pressure of 3.5
Kg / sq.cm. at highest and farthest outlet at specified
flow of 2850 lpm at 70 Mtr. head conforming to IS 1520

#REF! b) Suitable HP SQ cage induction motor, TEFC,


synchronous speed 1500 RPM, suitable for operation on
415Volts,3 phase 50 Hz. AC with IP 55 protection for
enclosure, horizontal foot mounted type with Class-'F'
insulation,conforming to IS-325
#REF! c) M.S. Fabricated common base plate,coupling,coupling
guard, foundation bolts etc as required.
#REF! d) Suitable cement concrete foundation duly plastered with
anti vibration pads. Makes of Pumps: Kirloskar/Mather &
Platt. Makes of Motors: Siemens/ ABB/ Kirloskar

#REF! ELEC-10.7.4 Supplying,installation,Testing and commissioning of diesel 1 Set


engine driven main fire pump suitable for automatic operation
and consisting of following :complete in all respect as required

#REF! a) Horizontal type, multistage, centrifugal pump of cast iron


body & bronze impeller with stainless steel shaft, mechanical
seal to ensure a minimum pressure of 3.5 Kg / sq.cm. at
highest and farthest outlet at specified flow of 1620 lpm at
56 Mtr head conforming to IS 1520
#REF! b) Suitable HP, 1500 RPM water cooled with radiator, diesel
engine conforming to relevant BS & IS standard complete
with auto starting mechanism, 12 Volts / 24 Volts electric
starting equipment, Diesel Tank, exhaust pipe extended
upto 1 m. outside pump house duly insulated with 50mm
thick glass wool with 1.0mm thick alluminium sheet cladding,
residential silencer, instruments and protection as per
specification, stop solenoid for auto stop in the event of
fault with audio indications, painted with post office red
colour etc as required.

#REF! c) M.S.Fabricated common base plate, coupling, coupling


guard, foundation bolts etc as required.
#REF! d) Suitable cement concrete foundation duly plastered with
anti vibration pads. Makes of Engines : Kirloskar /
Cummins. Makes of Pumps : Kirloskar / Mather&Platt
#REF! ELEC-10.7.5 Supplying , installation, Testing and commissioning of diesel 1 Set
engine driven main fire pump suitable for automatic operation
and consisting of following : complete in all respect as
required
#REF! a) Horizontal type, multistage, centrifugal pump of cast iron
body & bronze impeller with stainless steel shaft, mechanical
seal to ensure a minimum pressure of 3.5 Kg / sq.cm.at
highest and farthest outlet at specified flow of 2280 lpm at 70
Mtr head conforming to IS 1520
#REF! b)Suitable HP, 1500 RPM water cooled with radiator, diesel
engine conforming to relevant BS & IS standard complete
with auto starting mechanism, 12 Volts / 24 Volts electric
starting equipment, Diesel Tank, exhaust pipe extended upto
1 m. outside pump house duly insulated with 50mm thick
glass wool with 1.0mm thick alluminium sheet cladding,
residential silencer, instruments and protection as per
specification, stop solenoid for auto stop in the event of fault
with audio indications, painted with post office red colour etc
as required.

#REF! c) M.S.Fabricated common base plate, coupling, coupling


guard, foundation bolts etc as required.
#REF! d) Suitable cement concrete foundation duly plastered with
anti vibration pads. Makes of Engines : Kirloskar /
Cummins. Makes of Pumps : Kirloskar / Mather&Platt
#REF! ELEC-10.7.6 Supplying , installation, Testing and commissioning of diesel 1 Set
engine driven main fire pump suitable for automatic
operation and consisting of following : complete in all respect
as required
#REF! a)Horizontal type, multistage, centrifugal pump of cast iron
body & bronze impeller with stainless steel shaft, mechanical
seal to ensure a minimum pressure of 3.5 Kg /sq.cm. at
highest and farthest outlet at specified flow of 2850 lpm at
70 Mtr head conforming to IS 1520
#REF! b)Suitable HP, 1500 RPM water cooled with radiator, diesel
engine conforming to relevant BS & IS standard complete
with auto starting mechanism, 12 Volts / 24 Volts electric
starting equipment, Diesel Tank, exhaust pipe extended upto
1 m. outside pump house duly insulated with 50mm thick
glass wool with 1.0mm thick alluminium sheet cladding,
residential silencer, instruments and protection as per
specification, stop solenoid for auto stop in the event of fault
with audio indications, painted with post office red colour etc
as required.

#REF! c) M.S. Fabricated common base plate, coupling, coupling


guard, foundation bolts etc as required.
#REF! d)Suitable cement concrete foundation duly plastered with
anti vibration pads. Makes of Engines : Kirloskar /Cummins.
Makes of Pumps : Kirloskar / Mather&Platt
#REF! ELEC-10.7.7 Supplying,installation,testing andcommissioning of electric 1 Set
driven mainfire pump suitable for automatic operation and
consisting of following : completein all respect as required
#REF! a) End suction back pull out centrifugal pump, Std fitted with
BRONZE IMPELLER & gland packing ,capacity 171 Cum/hr
(2850 LPM) at total head 70 M at operating speed 2900 rpm.
Pump duty as per TAC
#REF! b) 55 KW /75 HP, 3000 srpm,TEFC (IP55) horizontal foot
mounted, squirrel cage induction motor, suitable for 415
volts +/- 10%, 3 Ph, 50 Hz +/-5%, a.c.supply. Class ‘F’
insulated and suitable for ambient temperature up to 50 deg
C. Motor in frame SC 250 M frame for driving above pump.

#REF! c) M.S. Fabricated common base plate, coupling,


coupling guard, foundation bolts etc as required.
#REF! d)Suitable cement concrete foundation duly plastered with
anti vibration pads. Makes of Pumps: Kirloskar / Mather &
Platt. Makes of Motors: Siemens/ ABB/ Kirloskar
#REF! ELEC-10.7.8 Supplying ,installation,Testing and commissioning of diesel 1 Set
engine driven main fire pump suitable for automatic operation
and consisting of following : complete in all respect as
required
#REF! a) End suction back pull out pump, Std fitted with BRONZE
Impeller & gland packing, capable of delivering 171 Cum/hr
(2850 LPM) at a total head of 70 M when operated at 1800
rpm and pump duty as per TAC
#REF! b)Liquid cooled, 85 BHP at 1800 rpm, diesel engine (Radiator
cooled) 12 Volts starting system with standard accessories

#REF! c)M.S. Fabricated common base plate,coupling, coupling


guard, foundation bolts etc as required.
#REF! d) Suitable cement concrete foundation duly plastered with
anti vibration pads. Makes of Engines : Kirloskar /
Cummins. Makes of Pumps : Kirloskar / Mather&Platt
#REF! ELEC-10.7.9 Supplying , installation ,testing and commissioning of electric 1 Set
driven main fire pump suitable for automatic operation and
consisting of following : complete in all respect as required

#REF! a)End suction back pull out centrifugal pump, Std fitted with
BRONZE IMPELLER & gland packing ,capacity 137 Cum/hr
(2280 LPM) at total head 70 mwc at operating speed 2900
rpm. Pump duty as per TAC
#REF! b) 45KW / 60 HP, 3000 srpm, TEFC (IP55) Horizontal foot
mounted, squirrel cage induction motor, suitable for 415
volts +/- 10%, 3 Ph, 50 Hz +/-5%, a.c.supply.
Class ‘F’ insulated and suitable for ambient temperature
up to 50 deg C. Motor in frame SC 225 M frame

#REF! c) M.S.Fabricated common base plate, coupling, coupling


guard, foundation bolts etc as required.
#REF! d) Suitable cement concrete foundation duly plastered with
anti vibration pads. Makes of Pumps: Kirloskar / Mather &
Platt. Makes of Motors: Siemens/ ABB/ Kirloskar

#REF! ELEC-10.7.10 Supplying, installation,Testing and commissioning of diesel 1 Set


engine driven main fire pump suitable for automatic operation
and consisting of following : complete in all respect as
required
#REF! a)End suction back pull out pump, Std fitted with BRONZE
Impeller & gland packing, capable of delivering 137 Cum/hr
(2280 LPM) at a total head of 70 M when operated at 2150
rpm and pump duty as per TAC
#REF! b) Liquid cooled, 68 BHP at 1800 rpm, Diesel engine
(Radiator cooled) 12 Volts starting system with standard
accessories
#REF! c) M.S.Fabricated common base plate, coupling, coupling
guard, foundation bolts etc as required.
#REF! d)Suitable cement concrete foundation duly plastered with ant
vibration pads. Makes of Engines : Kirloskar / Cummins.
Makes of Pumps : Kirloskar / Mather&Platt

#REF! ELEC-10.7.11 Supplying, installation,Testing and commissioning of diesel 1 Set


engine driven main fire pump suitable for automatic operation
and consisting of following : complete in all respect as
required
#REF! a) End suction back pull out centrifugal pump, Std fitted with
BRONZE IMPELLER & gland packing ,capacity 97 Cum/hr
(1620 LPM) at total head 56 mwc at operating speed 2900
rpm.Pump duty as per TAC
#REF! b) 30 KW / 40 HP,3000 srpm, TEFC (IP55) horizontal foot
mounted, squirrel cage induction motor, suitable for 415
#REF! volts +/- 10%, 3 Ph, 50 Hz +/-5%, a.c.supply. Class 'F’
insulated and suitable for ambient temperature up to 50
deg C. Motor in frame SC 250 M frame for driving above
pump.
#REF! c) M.S. Fabricated common base plate, coupling, coupling
guard, foundation bolts etc as required.
#REF! d) Suitable cement concrete foundation duly plastered with
anti vibration pads. Makes of Pumps:Kirloskar / Mather &
Platt. Makes of Motors: Siemens/ ABB/ Kirloskar

#REF! ELEC-10.7.12 Supplying , installation, Testing and commissioning of diesel 1 Set


engine driven main fire pump suitable for automatic
operation and consisting of following : complete in all respect
as required
#REF! a)End suction back pull out pump, Std fitted with BRONZE
Impeller & gland packing, capable of delivering 97 Cum/hr
(1620 LPM) at a total head of 56 M when operated at 2150
rpm and pump duty as per TAC
#REF! b)Liquid cooled, 50 BHP at 1800 rpm, Diesel engine (Radiator
cooled) 12 Volts starting system with standard accessories

#REF! c) M.S. Fabricated common base plate, coupling,


coupling guard, foundation bolts etc as required.
#REF! d) Suitable cement concrete foundation duly plastered with
anti vibration pads. Makes of Engines : Kirloskar /Cummins.
Makes of Pumps : Kirloskar / Mather&Platt
#REF! ELEC-10.7.13 Supplying , installation , testing and commissioning of electric 1 Set
driven pressurisation / Jockey pump suitable for automatic
operation and consisting of following : complete in all
respect as required
#REF! a) Horizontal type, multistage, centrifugal pump of cast iron
body & bronze impeller with stainless steel shaft, mechanical
seal and flow of 180 lpm at 56 Mtr head conforming to IS
1520
#REF! b)Suitable HP SQ cage induction motor TEFC type suitable
for operation on 415Volts, 3 phase 50 Hz. AC with IP 55 class
of protection for enclosure, horizontal foot mounted type with
Class-'F' insulation, conforming to IS-325

#REF! c) M.S. Fabricated common base plate, coupling, coupling


guard, foundation bolts etc as required.
#REF! d) Suitable cement concrete foundation duly plastered with
anti vibration pads.Makes of Pumps : Kirloskar / Mather
&Platt. Makes of Motors : Siemens/ ABB/ Kirloskar

#REF! ELEC-10.7.14 Supplying , installation , testing and commissioning of 1 Set


electric driven pressurisation / Jockey pump suitable for
automatic operation and consisting of following : complete
in all respect as required
#REF! a) Horizontal type, multistage, centrifugal pump of cast iron
body & bronze impeller with stainless steel shaft,
conforming to IS 1520
#REF! b) Suitable HP SQ cage induction motor TEFC type suitable
for operation on 415Volts, 3 phase 50 Hz. AC with IP 55
class of protection for enclosure, horizontal foot mounted
type with Class-'F' insulation, conforming to IS-325

#REF! c) M.S. Fabricated common base plate, coupling, coupling


guard, foundation bolts etc as required.
#REF! d)Suitable cement concrete foundation duly plastered with
anti vibration pads. Makes of Pumps : Kirloskar /
Mather&Platt. Makes of Motors : Siemens/ ABB/ Kirloskar
#REF! ELEC-10.7.15 Supplying, installation, testing and commissioning of electric 1 Set
driven Terrace / Booster pump suitable for automatic
operation and consisting of following : complete in all respect
as required.

#REF! a) Horizontal type, multistage, centrifugal pump of cast iron


body & bronze impeller with stainless steel shaft, mechanical
seal and flow of 900 lpm at 45 Mtr head conforming to IS
1520

#REF! b) Suitable HP SQ cage induction motor TEFC type suitable


for operation on 415Volts, 3 phase 50 Hz. AC with IP 55
class of protection for enclosure, horizontal foot mounted type
with Class-'F' insulation, conforming to IS-325

#REF! c) M.S. Fabricated common base plate, coupling, coupling


guard, foundation bolts etc as required.

#REF! d) Suitable cement concrete foundation duly plastered with


anti vibration pads.
Makes of Pumps : Kirloskar / Mather&Platt.
Makes of Motors : Siemens / ABB / Kirloskar

#REF! ELEC-10.7.16 Supplying , installation, testing and commissioning of 1 Set


electric driven Terrace / Mono Bloc Booster pump suitable for
automatic operation and consisting of following : complete in
all respect as required.

#REF! a) Horizontal type,centrifugal End Suction pump of cast iron


body & bronze impeller with stainless steel shaft, mechanical
seal and flow of 900 lpm at 45 Mtr head conforming to IS
1520

#REF! b) Three Phase High Speed Centrifugal Pump. Pump with CI


Impeller and Gland Packing with 9.3 KW / 12.5HP, 2 pole,
TEFC, 415 V, 3ph motor

#REF! c) M.S. Fabricated common base plate, coupling, coupling


guard, foundation bolts etc as required.

#REF! d) Suitable cement concrete foundation duly plastered with


anti vibration pads. Makes : Kirloskar

#REF! ELEC-10.7.17 Supplying, installation,testing and commissioning of electric 1 Set


driven Terrace / Mono Bloc Booster pump suitable for
automatic operation and consisting of following : complete in
all respect as required.
#REF! a) Horizontal type, centrifugal End Suction pump of cast iron
body & bronze impeller with stainless steel shaft, mechanical
seal and flow of 750 lpm at 35 Mtr head conforming toIS
1520

#REF! b) Three Phase High Speed Centrifugal Pump. Pump with CI


Impeller and Gland Packing with 7.5 KW / 10 HP, 2 pole,
TEFC, 415 V, 3ph motor

#REF! c) M.S. Fabricated common base plate, coupling, coupling


guard, foundation bolts etc as required.

#REF! d) Suitable cement concrete foundation duly plastered with


anti vibration pads.Makes : Kirloskar

#REF! ELEC-10.7.18 Supplying, installation, testing and commissioning of electric 1 Set


driven Terrace / Mono Bloc Booster pump suitable for
automatic operation and consisting of following : complete in
all respect as required.

#REF! a) Horizontal type, centrifugal End Suction pump of cast iron


body & bronze impeller with stainless steel shaft, mechanical
seal and flow of 450 lpm at 35 Mtr head conforming to
IS 1520

#REF! b) Three Phase High Speed Centrifugal Pump. Pump with CI


Impeller and Gland Packing with 5 KW / 7.5 HP, 2 pole,
TEFC, 415 V, 3ph motor

#REF! c) M.S. Fabricated common base plate, coupling, coupling


guard, foundation bolts etc as required.

#REF! d) Suitable cement concrete foundation duly plastered with


anti vibration pads. Makes : Kirloskar

#REF! ELEC-10.7.19 Providing , laying, testing & Commissioning of following


classes MS pipes conforming to IS 3589 and 1239 including
fittings like elbows, tees, flanges, tapers, nuts, bolts, gaskets
etc., complete. Makes: - Jindal / Hissar / Tata pipes

#REF! ELEC-10.7.19a 250 mm dia 1 Mtr

#REF! ELEC-10.7.19b 200 mm dia 'C' Class 1 Mtr

#REF! ELEC-10.7.19c 200 mm dia 'B' Class 1 Mtr

#REF! ELEC-10.7.19d 150 mm dia 'C' Class 1 Mtr

#REF! ELEC-10.7.19e 150 mm dia 'B' Class 1 Mtr

#REF! ELEC-10.7.19f 100 mm dia 'C' Class 1 Mtr

#REF! ELEC-10.7.19g 100 mm dia 'B' Class 1 Mtr

#REF! ELEC-10.7.19h 80 mm dia 'C' Class 1 Mtr

#REF! ELEC-10.7.19i 80 mm dia 'B' Class 1 Mtr


#REF! ELEC-10.7.19j 65 mm dia 'C' Class 1 Mtr

#REF! ELEC-10.7.19k 65 mm dia 'B' Class 1 Mtr

#REF! ELEC-10.7.19l 50 mm dia 'C' Class 1 Mtr

#REF! ELEC-10.7.19m 50 mm dia 'B' Class 1 Mtr

#REF! ELEC-10.7.19n 40 mm dia 1 Mtr

#REF! ELEC-10.7.19o 32 mm dia 'C' Class 1 Mtr

#REF! ELEC-10.7.19p 32 mm dia 'B' Class 1 Mtr

#REF! ELEC-10.7.19q 25 mm dia 'C' Class 1 Mtr

#REF! ELEC-10.7.19r 25 mm dia 'B' Class 1 Mtr

#REF! ELEC-10.7.20 Supplying and fixing single headed Internal / External 1 No


hydrant valve with instantaneous Gun metal couplings of
63mm dia with Cast iron wheel ISI marked conforming to IS
5290 (Type -A) with blank Gun Metal cap and chain as
required. Makes:Audco / Kirloskar / BDK /H Shankar/ Leader/
Zolotto/ Intervalve.

#REF! ELEC-10.7.21 Supplying, fixing, testing and commissioning of butterfly


valve PN 1.6, with Bronze / Gun metal seat duly ISI marked
complete with Nuts, Bolts, Washers, gaskets, conforming to IS
13095 of following sizes as required. Makes:Audco /
Kirloskar / BDK /H Shankar/ Leader/ Zolotto / Intervalve.

#REF! ELEC-10.7.21a 250 mm . dia 1 No

#REF! ELEC-10.7.21b 200 mm . dia 1 No

#REF! ELEC-10.7.21c 150 mm dia 1 No

#REF! ELEC-10.7.21d 100 mm dia 1 No

#REF! ELEC-10.7.21e 80 mm dia 1 No

#REF! ELEC-10.7.22 Providing, installation, testing and commissioning of dual plate


non - return valve of following sizes confirming to IS: 5312
complete with rubber gasket, GI bolts , nuts, washers etc as
required Makes:Audco / Kirloskar / BDK / H Shankar /
Leader / Zolotto / Intervalve.

#REF! ELEC-10.7.22a 200 mm dia 1 No

#REF! ELEC-10.7.22b 150 mm dia 1 No

#REF! ELEC-10.7.22d 100 mm dia 1 No

#REF! ELEC-10.7.22e 80 mm dia 1 No

#REF! ELEC-10.7.22f 50 mm dia 1 No


#REF! ELEC-10.7.23 Providing, installation, testing and commissioning of dual plate
non - return valve of following sizes confirming to IS: 5312
complete with rubber gasket, GI bolts , nuts, washers etc as
required Makes:Audco / Kirloskar / BDK / H Shankar /
Leader / Zolotto / Intervalve.

#REF! ELEC-10.7.23a 250 mm . dia 1 No


#REF! ELEC-10.7.23b 200 mm . dia 1 No
#REF! ELEC-10.7.23c 150 mm dia 1 No
#REF! ELEC-10.7.23d 100 mm dia 1 No
#REF! ELEC-10.7.23e 80 mm dia 1 No
#REF! ELEC-10.7.23f 50 mm dia 1 No
#REF! ELEC-10.7.24 Manufacture, Supply and delivery of CI Wafer Lug type
Butterfly Valves conforming to IS 13095/1991 (Reaffirmed
1998) excluding transportation, CED and taxes etc.,
complete. Operation done with worm actuator ISI marked
Rate at Ex-Factory Makes:Audco / Kirloskar / BDK /H
Shankar/ Leader/ Zolotto / Intervalve.

#REF! ELEC-10.7.24a 50 mm dia 1 No


#REF! ELEC-10.7.24b 40 mm dia 1 No
#REF! ELEC-10.7.24c 32 mm dia 1 No
#REF! Deleted From SOR 11-12 ELEC-2.2.7
#REF! ELEC-10.7.25 Supplying and fixing 63mm dia, 15 mtr long RRL hose pipe 1 No
with 63mm dia Male and Female Gun metal / SS
couplings duly binded with GI wire, rivets etc conforming
to IS 636 (Type -A) as required. Make: Newage/ Winco/
Padmini
#REF! ELEC-10.7.26 Supplying and fixing 63mm dia, 15 mtr long CP hose pipe with 1 No
63mm dia Male and Female Gun metal / SS couplings duly
binded with GI wire, rivets etc conforming to IS 636 (Type -A)
as required. Make: Newage/ Winco/ Padmini

#REF! ELEC-10.7.27 Supplying and fixing First -Aid Hose Reel with MS 1 No
construction spray painted in Post office Red, Conforming to
Is 884 with upto date amendments, complete with the
following as required.

#REF! a) 36.6 Mtr Long 20mm (Nominal internal) dia water hose
Thermoplastic / Textile reinforced / Rubber braided /
Polypropylene Type - 2 as per IS:12585 Make: Eversafe/
Reliance/ Newage/ SRI

#REF! b) 20mm (Nominal internal) dia gun metal globe valve and
nozzle. Make: Newage/ Winco/ Padmini

#REF! c) Drum and brackets for fixing the equipments on wall.

#REF! d) Connections from riser with 25mm dia stop valve (gun
metal) & MS pipe.
#REF! ELEC-10.7.28 Supplying and fixing of hose cabinet of size 750mm X 1 No
600mm x 250mm made of No 16 gauge SWG CRCA sheet
with 6mm thick glazed glass door including necessary
locking arrangement suitable to accommodate 2 Nos 15 mtr
long Hose pipe, 1 No branch pipe, mounted on wall OR raised
brick platform and duly painted with Post office red externally
and white internally with synthetic enamel paint complete in all
respect, for external hydrant as required.

#REF! ELEC-10.7.29 Supply and fixing 63mm dia Gun metal branch pipe with 1 No
20mm (Nominal internal diameter) size Gun metal / SS nozzle
conforming to IS 903, suitable for instantaneous connection to
interconnect hose pipe coupling as required. Make: Newage/
Winco/ Padmini

#REF! ELEC-10.7.30 Supply and fixing 4 way fire brigade connection of cast iron 1 No
body with 4 Nos Gun metal Male instantaneous inlet
couplings complete with cap and chain as required for
150mm dia MS pipe connection, conforming to IS 904 as
required.

#REF! ELEC-10.7.31 Supply and fixing 2 way fire brigade connection of cast iron 1 No
body with 2 Nos Gun metal Male instantaneous inlet
couplings complete with cap and chain as required for
100mm dia MS pipe connection, conforming to IS 904 as
required.

#REF! ELEC-10.7.32 Supply and fixing air vessel made of 250 mm dia, 8 mm thick 1 No
MS sheet, 1200mm in height with air release valve on top
and flanged connection to riser, drain arrangement with
25mm dia Gun metal wheel valve, with required accessories,
pressure gauge and painting with synthetic enamel paint of
approved shade as required.

#REF! ELEC-10.7.33 Providing fixing, testing and commissioning of 15mm size 1 No


quartzoid bulb type sprinklers of rating 68º C. pendent / side
wall with required accessories. Makes: HD / TYCO /
VIKING / NEWAGE/ SHARP

ELEC-10.7.34 Supply and fixing of Pressure Switch in the 1 No


MS pipe Line including connection etc as
required.
Make : Danfoss / Indfoss / Approved makes
#REF! ELEC-10.7.35 Providing and fixing of Pressure Switch in the MS pipe Line 1 No
including connection etc as required. Make : Danfoss /
Indfoss / Approved makes

#REF! ELEC-10.7.36 Providing and fixing Flow Switches in 100mm dia MS pipe. 1 No
Makes : System Sensor / Switzer / Approved makes

#REF! ELEC-10.7.37 Providing and fixing Flow Switches in 150 mm dia MS pipe. 1 No
Makes : System Sensor / Switzer / Approved makes
#REF! ELEC-10.7.38 Supply, installation, testing and commissioning of Bourden 1 No
type, stainless steel dial type pressure gauge with isolation
valve and pipe having calibration of 0-16 kg/cm2. MAKE:
HGURU/FIEBIG and Approved makes

#REF! ELEC-10.7.39 Supply, installation, testing and commissioning of 25mm dia 1 No


Gate valve Makes : Zoloto / Leader / Approved makes

#REF! ELEC-10.7.40 Supply, installation, testing and commissioning of 25mm dia 1 No


Ball valve Makes : Zoloto / Leader / Approved makes

#REF! ELEC-10.7.41 Supply, installation, testing and commissioning of 25 / 1 No


20mm dia Air Release Valve

ELEC-10.7.42 Supply, installation, testing and commissioning of Flexible 1 No


Sprinkler hose of size 750mm to 800mm
ELEC-10.7.43 Supply, installation, testing and commissioning of Flexible 1 No
Sprinkler hose of size 1000mm to 1200mm
ELEC-10.7.44 Supply, installation, testing and commissioning of Flexible 1 No
Sprinkler hose of size 1.50 Mtr
#REF! ELEC-10.7.45 Providing, fixing, testing, commissioning of installation control 1 No
valve of Cast iron body and brass / Bronze working parts
comprising of water, motor alarm, bronze seat clapper,
and clapper arm, hydraulically driven mechanical gong bell to
sound continuous alarm when the Wet riser / Sprinkler system
activates, pressure gauges, emergency releases, strainer,
pressure switch, cock valve complete with drain valve and
bypass , test control box, ball valves, Ms pipe of required size,
flanges, orifice plate, gasket etc of size 150mm dia as
required. Makes : HD / TYCO / NEWAGE

#REF! ELEC-10.7.46 Supplying, installing, testing and commissioning approved


make CI body Foot Valve with brass strainer with necessary
flanges, nuts and bolts etc., complete on to the suction
line.Rate as per the lowest quotation of Bharat Fire Safety
Engineers.Makes:Normex & approved makes

#REF! ELEC-10.7.46a 200mm nominal dia 1 Ea

#REF! ELEC-10.7.46b 150mm nominal dia 1 Ea

#REF! ELEC-10.7.46c 100mm nominal dia 1 Ea

#REF! ELEC-10.7.46d 80mm nominal dia 1 Ea

#REF! ELEC-10.7.47 Supply and laying of 300mm dia NP2 RCC Hume pipe with AS per
Collars for Road crossings Civil
SSR
#REF! ELEC-10.7.48 Supplying and wrapping the anticorrosive material for
buried pipes with coating of Primer and wrapping with 4 mm
thick polymer corrosion resistant tape as per IS : 10221 with
15 mm overlap as per specificatios.

#REF! ELEC-10.7.48a 150mm nominal dia 1 Mts


#REF! ELEC-10.7.48b 100mm nominal dia 1 Mts

#REF! ELEC-10.7.48c 80mm nominal dia 1 Mts

#REF! ELEC-10.7.49 Supply, fabricating , installing structural steel supports for 1 Kg


fixing all sizes of MS pipes from ceiling / wall with MS
Channels, Angles, Flats, Rods, as required at site with anchor
fasteners, Clamps, threaded rods, nuts, bolts,washers etc
complete with painting.

ELEC-10.7.50 Supply of 3 Core x 1.5Sqmm FRLS armoured copper cable as


per IS. 7098 / Part-I / 1988 including all taxes etc., complete
of make Universal/ CCI /Unicab /Polycab /Finolex /KEI /
Havells.

ELEC-10.7.51 Supply of 3 Core x 2.5Sqmm FRLS armoured copper cable as


per IS. 7098 / Part-I / 1988 including all taxes etc., complete
of make Universal/ CCI /Unicab/Polycab / Finolex / KEI /
Havells.

#REF! ELEC-10.7.52 Supply of 4 Core x 1.5Sqmm FRLS armoured copper cable as 1 Mtr
per IS. 7098 / Part-I / 1988 including all taxes etc., complete
of make Universal/ CCI /Unicab /Polycab /Finolex /KEI /
Havells.

#REF! ELEC-10.7.53 Supply of 4 Core x 2.5Sqmm FRLS armoured copper cable as 1 Mtr
per IS. 7098 / Part-I / 1988 including all taxes etc., complete
of make Universal/ CCI /Unicab/Polycab / Finolex / KEI /
Havells.

#REF! ELEC-10.7.54 Supply of 8 Core x 2.5Sqmm FRLS armoured copper cable as 1 Mtr
per IS. 7098 / Part-I / 1988 including all taxes etc., complete
of make Universal /CCI /Unicab / Polycab / Finolex /KEI /
Havells.

#REF! ELEC-10.7.55 Supply of 10 Core x 1.5Sqmm FRLS armoured copper cable 1 Mtr
as per IS. 7098 / Part-I / 1988 including all taxes etc.,
complete of make Universal/CCI / Unicab /Polycab /Finolex
/KEI /Havells.

#REF! 11.1 GENERATORS SPECIFICATION


#REF! ELEC-11.1.1 Supply, Transportation, erection and
commissioning (Excluding Foundation) of 3
Phase, 415, 50Hz, water cooled multi
cylinder diesel generator set with alternator
of - - - KVA/ - - - - - KW out put contineous
rating directly coupled Engine and
Alternator with guard and mounted on a
common base plate of Robust construction
and complete with standard control panel
having IP-52 protection, Acoustic Enclosure
as per CPCB norms , sound absorbing
material, t to restrict sound level up to 75dB up to 1 mtr
distance and as per CPCB
norms etc as per following specifications
mentioned below.
#REF! A. Alternator : Kirloskar / Stamford /
Crompton Greaves / Leroy Somer make.
The alternator of the output rating shall be 3
Phase, 415V, 50Hz, Ac , 0.8 P.F. lagging at
1500 RPM. The alternator is self excited,
self regulated, and shall confirm to IS:
13364 of 1992 with regulation of +5% from
no load to full load. degree of protections
shall be IP23.

#REF! B.Diesel Engine : Kirloskar / Cummins /


Mahindra & Mahindra Diesel Engine start,
developing suitable -------------- BHP output
at 1500 RPM with mechanical / electronic
governing so as to enable the alternator to
give - - - - -KVA continuous output at 0.8
P.F. lagging at NTP conditions. The diesel
engine shall be capable of providing 10%
O/L for 1 Hr for every 11 Hrs of continuous
running at full load. The engine with 1st
filling of oil and Diesel etc.
01. Exhaust pipe of required size and
length with insulation or clading.
02. Diesel tank suitable for 8 to 12 Hours
running capacity.
03. Residential Silencer.
04. SMF Batteries with leads as per the
Manufacturer standards

ELEC-11.1.1a 15KVA, 3 Phase, 415, 50Hz, 19BHP, water cooled 1 No


multi cylinder diesel generator set with alternator of
15 KVA out put continous rating at 0.8 p.f, Batteries.
(SOR-2013-14-ELEC-10.1.1)

ELEC-11.1.1b 30KVA, 3 Phase, 415, 50Hz, 40 to 42 BHP, water 1 No


cooled multi cylinder diesel generator set with
alternator of 30KVA out put continous rating at 0.8
p.f, Batteries. (SOR-2013-14-ELEC-10.1.2)

ELEC-11.1.1c 40KVA, 3 Phase, 415, 50Hz, 56BHP, water cooled 1 No


multi cylinder diesel generator set with alternator of
40 KVA out put continous rating at 0.8 p.f, and
Batteries .

#REF! ELEC-11.1.2 Supply, Transportation, erection and


commissioning (Excluding Foundation) of 3
Phase, 415, 50Hz, water cooled multi
cylinder diesel generator set with alternator
of - - - KVA/ - - - - - KW out put contineous
rating directly coupled Engine and
Alternator with guard and mounted on a
common base plate of Robust construction
and complete with AMF panel having IP-52
protection, Acoustic Enclosure as per
CPCB norms , sound absorbing material,
to restrict sound level up to 75 dB up to 1
mtr distance and as per CPCB norms etc
as per following specifications mentioned
below
#REF! A. Alternator : Kirloskar / Stamford /
Crompton Greaves / Leroy Somer make.
The alternator of the output rating shall be 3
Phase, 415V, 50Hz, Ac , 0.8 P.F. lagging at
1500 RPM. The alternator is self excited,
self regulated, and shall confirm to IS:13364 of 1992 with
regulation of +5% from
no load to full load. degree of protections
shall be IP21.

#REF! B.Diesel Engine : Kirloskar / Cummins /


Mahindra & Mahindra Diesel Engine start,
developing suitable -------------- BHP output
at 1500 RPM with mechanical / electronic
governing so as to enable the alternator to
give - - - - -KVA continuous output at 0.8
P.F. lagging at NTP conditions. The diesel
engine shall be capable of providing 10%
O/L for 1 Hr for every 11 Hrs of continuous
running at full load. The engine with 1st
filling of oil and Diesel etc.01. Exhaust pipe
of required size and length with insulation
or clading.02. Diesel tank suitable for 8 to
12 Hours running capacity.03. Residential
Silencer.04. SMF Batteries with leads as
per the Manufacturer standards

#REF! C. AMF Control Panel:- AMF control panel


shall be fabricated with 16SWG CRCA
sheet shall be totally enclosed with dust
and Vermin proof, floor mounted / wall
mounted type and shall be comprising the
following.
01. Voltmeter with selector switch.
02. 4 Pole MCCB incomer of ----------A
rating of Schenieder / L&T make for EB and
DG .
03. Ammeter with selector switch with CTs.
04. PF Meter and frequency Meter.
05. Indicator lamps (set Run, Load ON) with
fuses.
06. KWH Meter of required rating.
07. Set of control fuses and current
transformer.
08. Input Terminal board and output
Terminal Board.
09. Battery charger with transformer
rectifier unit.
10. Alternator supply air break contactor of
L&T make.
11. Main supply air break contactor of L&T
make.
12. Audio Visual announciation .
13. Main supply voltage set of control relays
and timers with one mode selector switch,
set of push buttons.
14.Control cable up to 15 Mtrs 2.5Sqmm 6
Core
ELEC-11.1.2a 63.00KVA, 3 Phase, 415, 50Hz, 78 to 83BHP, water 1 No
cooled multi cylinder diesel generator set with
alternator of 63KVA out put continous rating at 0.8 p.f,
and Batteries .

ELEC-11.1.2b 125KVA, 3 Phase, 415, 50Hz, 154BHP, water cooled 1 No


multi cylinder diesel generator set with alternator of
125 KVA out put continous rating at 0.8 p.f, and
Batteries .

#REF! ELEC-11.1.3 Supply, Transportation, erection and


commissioning (Excluding Foundation) of 3
Phase, 415, 50Hz, water cooled multi
cylinder diesel generator set with alternator
of - - - KVA/ - - - - - KW out put contineous
rating directly coupled Engine and
Alternator with guard and mounted on a
common base plate of Robust construction
and complete with AMF panel having IP-52
protection, Acoustic Enclosure as per
CPCB norms , sound absorbing material, t
to restrict sound level up to 75 dB up to 1
mtr distance and as per CPCB norms etc
as per following specifications mentioned
below.

#REF! A. Alternator : Kirloskar / Stamford /


Crompton Greaves / Leroy Somer make.
The alternator of the output rating shall be 3
Phase, 415V, 50Hz, Ac , 0.8 P.F. lagging at
1500 RPM. The alternator is self excited,
self regulated, and shall confirm to IS:
13364 of 1992 or latest version with
regulation of +5% from no load to full load.
degree of protections shall be IP23.

#REF! B.Diesel Engine : Kirloskar / Cummins /


Catterpiller Diesel Engine start, developing
suitable -------------- BHP output at 1500
RPM with mechanical / electronic governing
so as to enable the alternator to give - - - -
-KVA continuous output at 0.8 P.F. lagging
at NTP conditions. The diesel engine shall
be capable of providing 10% O/L for 1 Hr
for every 11 Hrs of continuous running at
full load. The engine with 1st filling of oil
and Diesel etc.
01. Exhaust pipe of required size and
length with insulation or clading.
02. Diesel tank suitable for 8 to 12 Hours
running capacity.
03. Residential Silencer.
04. SMF Batteries with leads as per the
Manufacturer standards
#REF! C. AMF Control Panel:- AMF control panel
shall be fabricated with 16SWG CRCA
sheet shall be totally enclosed with dust
and Vermin proof, floor mounted / wall
mounted type and shall be comprising the
following.
01. Voltmeter with selector switch.
02. 4 Pole MCCB incomer of ----------A
rating of Schenieder / L&T make for EB and DG .
03. Ammeter with selector switch with CTs.
04. PF Meter and frequency Meter.
05. Indicator lamps (set Run, Load ON) with
fuses.
06. KWH Meter of required rating.
07. Set of control fuses and current
transformer.
08. Input Terminal board and output
Terminal Board.
09. Battery charger with transformer
rectifier unit.
10. Alternator supply air break contactor of
L&T make.
11. Main supply air break contactor of L&T
make.
12. Audio Visual announciation .
13. Main supply voltage set of control relays
and timers with one mode selector switch,
set of push buttons.
14.Control cable up to 15 Mtrs 2.5Sqmm 6
Core
14.Control cable up to 15 Mtrs 2.5Sqmm 6
Core

ELEC-11.1.3a 160KVA, 3 Phase, 415, 50Hz, 200BHP, water cooled 1 No


multi cylinder diesel generator set with alternator of 160
KVA out put continous rating at 0.8 p.f, and Batteries .

ELEC-11.1.3b 250KVA, 3 Phase, 415, 50Hz, 310BHP, water cooled 1 No


multi cylinder diesel generator set with alternator of
250 KVA out put continous rating at 0.8 p.f, and
Batteries

ELEC-11.1.3c 320KVA, 3 Phase, 415, 50Hz, 380BHP, water cooled 1 No


multi cylinder diesel generator set with alternator of
45 KVA out put continous rating at 0.8 p.f, and
Batteries

#REF! 12.1 UPS SYSTEMS


#REF! ELEC-12.1.1 Supply and installation of 800 VA,12VDC home UPS system 1 No
pure sine wave out put, single phase input / Single phase
output. Makes: Servomax / Top Power / Amar Raja

#REF! ELEC-12.1.2 Supply and installation of 1400 VA,24 VDC home UPS 1 No
system pure sine wave out put, single phase input / Single
phase output. Makes: Servomax / Top Power / Amar Raja
#REF! ELEC-12.1.3 Supply and installation of 2000VA, 36VDC home UPS system
pure sine wave out put, single phase input / Single phase
output. Makes: Servomax / Top Power /Amar Raja /Samhitha.

#REF! ELEC-12.1.4 Supply and installation of 2.0KVA true on line UPS 1 No


system IGBT technology pure sine wave out put, double
conversion with auto and manual static by pass switch
single phase input / Single phase output. Makes: Numeric /
DB Power.
#REF! ELEC-12.1.5 Supply and installation of 3.0KVA, 72VDC true on line UPS 1 No
system IGBT technology pure sine wave out put, double
conversion with auto and manual static by pass
switch single phase input / Single phase output. Makes:
CONSUL / Power one / Numeric / DB Power.

#REF! ELEC-12.1.6 Supply and installation of 5.0KVA, 180/192VDC true on line 1 No


UPS system IGBT technology pure sine wave out put, double
conversion with auto and manual static by pass switch single
phase input / Single phase output. Makes: CONSUL / Power
one / Numeric / DB Power.
#REF! ELEC-12.1.7 Supply and installation of 7.5KVA, 180/192VDC true on line 1 No
UPS system IGBT technology pure sine wave out
put, double conversion with auto and manual static by
pass switch single phase input / Single phase output.
Makes: CONSUL / Power one / Numeric / DB Power.

#REF! ELEC-12.1.8 Supply and installation of 10KVA, 180/192VDC true on line 1 No


UPS system IGBT technology pure sine wave out put, double
conversion with auto and manual static by pass switch single
phase input / Single phase output. Makes: CONSUL / Power
one / Numeric / DB Power.
ELEC-12.1.9 Supply and installation of 10KVA / 312V DC
on line UPS system IGBT based rectifier
with input power factor correction 32 bit
microprocessor based with isolation
transformers double conversion, SNMP
controls, LCD display, Pure sine wave out
put, with auto static switch three phase
input / Three phase output and modular
structure for better thermal technology /
cooling facility, with warranty up to three
years.
Makes: Consul / Eaton / APC / Numeric /
Emerson

ELEC-12.1.10 Supply and installation of 15KVA / 312V DC


on line UPS system IGBT based rectifier
with input power factor correction 32 bit
microprocessor based with isolation
transformers double conversion, SNMP
controls, LCD display, Pure sine wave out
put, with auto static switch three phase
input / Three phase output and modular
structure for better thermal technology /
cooling facility, with warranty up to three
years.
Makes: Consul / Eaton / APC / Numeric /
Emerson.

12.2 UPS BATTERY RACKS AND WIRE LEADS


#REF! ELEC-12.2.1 Supply and providing of UPS cum battery rack up to 4 1 No
batteries
#REF! ELEC-12.2.2 Supply and providing of UPS cum battery rack 5 to 10 1 No
batteries
#REF! ELEC-12.2.3 Supply and providing of UPS cum battery rack upto 11 to 20 1 No
batteries
#REF! ELEC-12.2.4 Supply and fixing of 12V 26 AH SMF battery including 1 No
wire leads make Quanta / Racket / Exide.
#REF! ELEC-12.2.5 Supply and fixing of 12V 42 AH SMF battery including 1 No
wire leads make Quanta / Racket / Exide.
#REF! ELEC-12.2.6 Supply and fixing of 12V 65 AH SMF battery including 1 No
wire leads make Quanta / Racket / Exide.
#REF! ELEC-12.2.7 Supply and fixing of 12V 100 AH SMF battery including wire 1 No
leads make Quanta / Racket / Exide.
#REF! ELEC-12.2.8 Supply and fixing of 12V 120 AH SMF battery including wire 1 No
leads make Quanta / Racket / Exide.
#REF! ELEC-12.2.9 Supply and fixing of 12V, 120 AH MF battery including wire 1 No
leads make Amar Raja(Power Zone) or Equivalent model of
Exide / Panasonic / Gotech.
#REF! ELEC-12.2.10 Supply and fixing of 12V, 150 AH MF battery including wire 1 No
leads make Amar Raja(Power Zone) or Equivalent model of
Exide / Panasonic / Gotech.

All the items to be used on work are of first quality & ISI and as approved by the Engineer In charge of the wo
Supply Rates for all the materials are based on market rates plus Sales Tax/ Material VAT.
Works Contract VAT for General/ Composition Scheme on finished items may be allowed as applicable.
SOR Rates for Building items are purely for guidance for the officers for preparation of estimates vide para.113
APPWD code. Authority who prepares the estimate is however responsible for proper rates as envisaged in p
JUNE
Basic Rate

SS Rate for
201718

99.00

126.75

178.50

307.90

386.00

27.00

28.80

79.10

113.25

221.25

71.00

124.00

152.35

23.40

25.80

58.00

90.00

190.00

25.80

27.80
78.60

94.80

194.40

20.70

22.00

60.10

78.10

176.00

217.30

276.70

562.00

843.40

1333.50

211.00

220.00

409.50

705.00

892.50

116.00

149.00

244.00

326.00

420.00

60.00

72.00

165.00
300.00

172.00

488.60

254.00

379.00

19.10

24.20

25.40

31.80

42.50

58.40

81.40

18.50

24.30

25.40

31.80

36.90

63.50
17.30

18.50

3.70

4.90

6.10

12.20

19.40

11.00

14.00

28.00

30.00

61.00

17.00

19.00

34.00

37.00

51.00

22.00

25.00

40.00

43.00

64.00

4.00

6.00

16.00

19.00
28.00

4.00

57.00

80.00

96.00

130.00

170.00

209.00

53.00

63.00

79.00

105.00

184.00

236.00

10.00

18.00

22.00

30.00

48.00

73.00

109.00

14.00

25.00

33.00

44.00

73.00
109.00

164.00

53.00

51.00

182.00

262.00

327.00

59.00

72.00

89.00

96.00

108.00

131.00

1051.00

1555.00

2510.00

3833.00

5828.00

9030.00

14280.00
924.00

1358.00

2195.00

3360.00

5250.00

7980.00

13230.00

797.00

1150.00
1856.00

2783.00

4305.00

6825.00

10500.00

170.00

240.00

340.00

470.00

42.00

67.00

90.00

140.00

100.00

155.00
200.00

250.00

57.00

97.00

128.00

170.00

219.00

346.00

74.00

112.00

170.00

270.00

400.00

520.00

850.00

1274.00

1688.00

2380.00

121.00

170.00

240.00

332.01

141.80

202.61

250.00

354.00

140.00
206.00

292.00

450.00

761.25

1175.54

1611.75

2287.50

3518.44

737

1497.00

1611.00

2693.00

3017.00

3629.00

6804.00

1040.00

5430.00

8340.00
12510.00

18430.00

29960.00

5717.00

8778.00

13167.00

19404.00

31532.00

18.00

21.00

20.00

27.00

20.00

35.00
21.00

65.00

65.00

102.00

50.00

220.00

21.00

20.00

17.00

48.00

26.00

32.00

106.00

50.00

45.00
102.00

240.00

450.00

21.00

310.00

410.00

15.00

19.00

15.00

20.00

18.00

28.00

18.00

55.00

55.00

85.00
44.00

180.00

16.00

85.00

23.00

26.00

24.00

35.00

28.00

26.00

28.00

39.00

80.00
110.00

49.00

240.00

54.00

35.00

40.00

92.00

101.00

93.00

141.00

117.00

137.00

126.00

126.00
138.00

138.00

188.00

196.00

158.00

473.00

100.00

98.00

63.00

75.00

64.00

93.00

75.00

90.00

83.00
83.00

95.00

91.00

133.00

135.00

65.00

375.00

65.00

64.00

65.00

77.00

89.00

130.00

172.00

210.00
56.00

69.00

81.00

108.00

137.00

167.00

1351.00

2329.00

5578.00

7280.00

8740.00

13445.00
22759.00

1129.00

1692.00

3827.00

5783.00

6521.00

9960.00

16538.00

4135.00

7828.00

10474.00

14884.00

22712.00
27012.00

3749.00

7283.00

9639.00

13709.00

21313.00

25597.00

1438.00

1318.00

4594.00

7006.00

760.00

2670.00
5019.00

936.00

1446.00

3302.00

6148.00

6190.00

9025.00

620.00

1033.00

2350.00

4579.00
4730.00

7747.00

50.00

77.00

248.00

363.00

704.00

1425.00

99.00

123.00

259.00

484.00

891.00

1182.00
8000.00

15000.00

6400.00

12000.00

6060.00

7194.00

16025.00

21690.00

6813.00

8700.00

20818.00

26208.00
4229.00

5530.00

14823.00

5668.00

7270.00

18010.00

19000.00

22890.00

104444.00

129841.00
139793.00

173174.00

147276.00

182744.00

154780.00

194892.00

94000.00

125813.00
116857.00

155832.00

132548.00

164470.00

13328.00

5385.00

4665.00

34800.00

15000.00

46550.00
10413.00

32750.00

40850.00

44550.00

41600.00

201.00

423.00

595.00

962.00

955.00

1477.00

1281.00

1899.00

162.00
356.00

512.00

701.00

818.00

1134.00

1062.00

1424.00

121.00

221.00

335.00

501.00

612.00

945.00

787.00
1112.00

338.00

367.00

488.00

624.00

725.00

814.00

890.00

956.00

318.00

334.00

411.00

585.00

590.00

678.00

734.00

918.00

215.00

258.00

345.00

383.00
428.00

572.00

2700.00

3300.00

2900.00

3135.00

3300.00

3330.00

3515.00

4000.00

2152.00

2902.00

2118.00

2780.00

2118.00
2558.00

2947.00

1880.00

760.00

800.00

1045.00

990.00

1245.00

1505.00

463.00
606.00

695.00

800.00

1130.00

1350.00

328.00

446.00

547.00
551.00

756.00

957.00

1500.00

3750.00

2491.00

7770.00

6045.00

7843.00
9823.00

901.00

1700.00

2000.00

1395.00

2200.00

3500.00

5600.00

6825.00

1275.00
1650.00

2530.00

3240.00

5170.00

450.00

925.00

1500.00

250.00

366.00

590.00

1200.00
1500.00

1260.00

990.00

3265.00

2570.00

4790.00

3975.00

5500.00

4340.00
7575.00

5765.00
14770.00

536.00

1071.00

2025.00

1838.00

3822.00

709.00

643.00

775.00

652.00

643.00

615.00
1005.00

902.00

1428.00

1223.00

2089.00

1696.00

180.00

95.00

160.00

190.00

260.00

415.00

460.00

2450.00

3350.00
4200.00

108.00

60.00

130.00

80.00

495.00

400.00
710.00

600.00

770.00

680.00

840.00

780.00

605.00

530.00

900.00

800.00

890.00

850.00

990.00

900.00

1350.00
1100.00

1540.00

1400.00

11000.00

11500.00

13100.00

14400.00

14900.00

18000.00
678.00

578.00

813.00

766.00

1222.00

1173.00

2300.00

3400.00

3749.00

750.00

126.00

110.00
120.00

110.00

160.00

146.00

160.00

145.00

210.00

170.00

11.00

8.00

21.00

17.00

53.00

42.00

32.00

25.00

15.00
12.00

614.00

275.00

1615.00

4300.00

850.00

540.00

350.00

215.00

385.00

12.00

11.00

41.00

45.00

38.00

120.00
75.00

80.00

105.00

115.00

160.00

135.00

115.00

125.00

135.00

110.00

180.00

170.00

200.00

200.00

1060.00

800.00
800.00

600.00

540.00
1600.00

1000.00
1300.00

1150.00

2350.00
1960.00

1610.00

1260.00
1170.00

1050.00
2890.00

2210.00
1610.00

1870.00
1660.00

1520.00
1400.00

1200.00

1100.00

1300.00
1100.00

1000.00

5350.00
4760.00

4420.00

5180.00

4420.00
4160.00
5780.00
5350.00
475.00
150.00

70.00
175.00
250.00
299.00
250.00
5000.00

8400.00

8600.00

14400.00
14600.00

19000.00

23000.00
25500.00
28500.00

33320.00
4900.00

6430.00

8075.00

10200.00

12410.00

14025.00

19550.00
21675.00
24225.00

28320.00
4420.00

5780.00

7310.00

9180.00

12620.00

16150.00

19550.00

21670.00

24225.00

10620.00
14870.00

19970.00

8920.00

13170.00

16570.00

250.00

235.00

375.00
350.00

580.00

545.00

700.00

660.00

420.00
395.00

890.00

840.00

1700.00

1600.00

15800.00
17900.00

20500.00

22000.00

4400.00

5200.00

5800.00

6400.00

92.00

78.00

108.00
93.00

129.00

112.00

130.00

112.00

147.00

128.00

162.00

140.00
207.00

180.00

247.00

212.00

326.00

280.00

421.00

363.00

547.00
472.00

669.00

579.00

762.00

658.00

934.00

806.00

1185.00

1023.00

1449.00
1251.00

1815.00

1568.00

603.00

683.00

816.00

972.00

1104.00

1248.00

1475.00

1680.00

1900.00
327.00

491.00

578.00

654.00

94.00

138.00

264.00

22.00

30.00

33.00

40.00

55.00

65.00

88.00
104.00

149.00

215.00

284.00

418.00

12.00

14.00

17.00

20.00

25.00

27.00

35.00

40.00

46.00

71.00
92.00

119.00

1300.00

1545.00

2230.00

4000.00

5425.00

15070.00
18095.00

23018.00

8211.00

8321.00

8925.00

9500.00

12452.00

12562.00

13750.00

14200.00
97.00

124.00

152.00

163.00

254.00

376.00

494.00

576.00

1300.00

960.00

845.00
725.00

400.00

200.00

300.00

550.00

1760.00

2220.00

1840.00

2160.00

2352.00

2714.00
6000.00

6600.00

1550.00

1350.00

1265.00

2645.00

3220.00

4100.00

9300.00

10900.00
400.00

275.00

275.00

165.00

780.00

1450.00

2490.00

14700.00

14000.00

16800.00

16000.00

17325.00
16500.00

21000.00

20000.00

25200.00

24000.00

31500.00

28350.00

35500.00

31950.00

39900.00
35910.00

39300.00

35370.00

43500.00

39150.00

44600.00

40140.00

46000.00

41400.00
47500.00

42750.00

54000.00

48600.00

46000.00

41400.00

56000.00

50400.00

60000.00

54000.00

62000.00
55800.00

11550.00

11000.00

13125.00

12500.00

17850.00

17000.00

17850.00

17000.00

22050.00

21000.00

26250.00
25000.00

33600.00

32000.00

5145.00

4900.00

7455.00

7100.00

9975.00

9500.00

12600.00

12000.00

14700.00

14000.00

19950.00
19000.00

24150.00

23000.00

4800.00

179.00

231.00

306.00

319.00

489.00

84.00

40.00

38.00

795069.00

380.00
450.00
650.00
780.00
1000.00
1100.00
1300.00
1490.00
1600.00
2000.00

175.00

240.00

300.00

209.00

350.00

380.00

200.00

300.00

400.00

150.00

300.00
42990.00

39600.00

53490.00

46990.00

50250.00

56490.00

54500.00

59990.00

53550.00

58990.00
65910.00

69295.00

82000.00

130090.00

137940.00

131800.00

125000.00

150970.00

115000.00

116300.00

155170.00

133000.00

168190.00
80000.00

82500.00

58380.00

68838.00

1000.00

1000.00

8150.00

9250.00

1590.00

156.00

410.00

200.00

242.00
225.00

485.00

225.00

475.00

325.00

400.00

560.00

427.00

1700.00

115.00

1500.00

2100.00

720.00

3100.00

3750.00

1590.00

125.00

40.00

1500.00
400.00

3000.00

2500.00

2000.00

1500.00

1750.00

110000.00

130000.00

180000.00

81.90

75.00

60.00

675.00
4800.00

4000.00

990.00

810.00

1805.00

1615.00

2250.00

2070.00

3000.00

2850.00

3600.00

3425.00

71.00

65.00

65.00
10647.00

9147.00

15722.00

13507.00

17000.00
14098.00

25040.00

22536.00

1215.00

1604.00

3800.00

4500.00

1500

2700.00

4950.00
8500.00

103354.00

88790.00
134879.00

121391.00
168256.00

151430.00

28884.00

30473.00
28073.00

35794.00

45551.00

14580.00
13122.00

16740.00

15066.00
1220.00
1750.00
2385.00
2830.00

3200.00

4500.00

6000.00

7500.00
8908.00

11168.00

14275.00

18795.00

27268.00

1650.00
1650.00
1980.00
2310.00
5500.00

4340.00

4030.00

3565.00

2500.00
450.00

2500.00

450.00

4556.00

2700.00

10023.00

175.00

135.00

450.00

1050.00
3037.00

13600.00

16900.00

4000.00

2500.00

4350.00

500.00

2500.00

3500.00

750.00

1050.00

300.00
550.00

700.00

1450.00

590.00

390.00

300.00

3000.00

4000.00

350.00

380.00

165.00

175.00

300.00

500.00

1300.00
2000.00

3000.00

4200.00

4500.00

6800.00

120.00

8.00

5.00

350.00
165000.00
180000.00
295000.00
325000.00
375000.00
550000.00
400000.00
645000.00
735000.00
910000.00

1500.00

600.00

300.00

675.00
90.00

7000.00

6100.00

5900.00

4000.00

25013.00

15383.00

3129.00

1665.00

50.00

128000.00

31200.00

16000.00
11500.00

410.00

1010.00

2800.00

2300.00

4400.00

340.00

15600.00

6700.00

1235.00

12500.00

220.00

200.00

6500.00

3680.00

387.00

40.00

76.00

195.00

650.00

990.00

2070.00

7900.00
4700.00

5580.00

6484.00

7348.00

10125.00

32000.00

75.00

105.00

7500.00

9500.00

2000.00

350.00

250.00

460.00

605.00

1035.00

435.00

560.00

1010.00

340.00

430.00

830.00

165.00

28.00
44.00

55.00

13.00

24.00

44.00

73.00

15.00

10.00

330.00

440.00

61.00

17.00

25.00

300.00

200.00

75.00

30.00

80.00

100.00

75.00

90.00

250.00

61.00

17.00

7.00

83.00

22.00

1100.00

200.00
250.00

500.00

605.00

605.00

726.00

605.00

701.00

68.00

234.00

322.00

91.00

97.00

16500.00

67.00

266.00

165.00

6.60

0.60

220.00

594.00

3819.00

226.00

242.00

355.00

381.00

6.00

11.00

220.00
275.00

121.00

249.00

249.00

314.00

382.00

545.00

605.00

726.00

908.00

1210.00

88.00

4200.00

4200.00

4200.00

355.00

1800.00
40000.00

9400.00

13200.00

6500.00
620000.00

580000.00
450000.00

410000.00
415000.00

370000.00
280000.00

250000.00

235000.00
210000.00

200000.00
190000.00

118750.00

100000.00

5770.00

4700.00

5900.00

5300.00

5800.00

5100.00
5059.00

4560.00

6175.00

5558.00

5225.00

4655.00

5225.00

4655.00

4275.00

3800.00

7500.00
9900.00

13750.00

15950.00

20350.00

22550.00

27500.00

13750.00

675.00

650.00

150.00

1800.00

1500.00
1450.00

9180.00

5900.00

6370.00
4100.00

4500.00
2900.00

7200.00

5600.00
12960.00

11000.00

23490.00
21000.00

10900.00

8200.00
1300.00

15010.00

1200.00

1000.00

183200.00
46550.00

2375.00
2755.00

3135.00

70775.00
114000.00

38000.00

66975.00
8075.00

354000.00

390000.00
446400.00

468000.00

678000.00
762000.00

268750.00
556250.00

218750.00

443750.00

161250.00
387500.00

55000.00

77860.00
62450.00

48400.00

46245.00
42542.00

3245.00

3210.00

2800.00

2400.00

1930.00

1515.00

1275.00

1000.00

895.00
750.00

675.00

600.00

530.00

512.00

400.00

330.00

300.00

270.00

8125.00

12525.00

5300.00

4350.00

3400.00

3100.00

5000.00

4000.00

3725.00

3500.00

1723.00
17007.00
11849.00
7631.00
5088.00
3812.00
3067.00

1750.00
1400.00
1250.00

6140.00

5510.00

7500.00
3250.00

2530.00

9100.00

6900.00

16000.00

490.00

1200.00

2500.00

5375

7500.00
675.00

1175.00

650.00

1250.00

1000.00

1200.00

1400.00

9500.00

24790.00

13280.00

7450.00

5100.00

45.00
40.00

30.00

60.00

95.00

125.00

120.00

165.00

275.00

235.00
385875.00

496125.00

617400.00
810000.00

1100000.00
1433250.00

2205000.00

2866500.00

9500.00

13500.00
19200.00

29400.00

39507.00

68250.00

94500.00

110250.00

185000.00

212000.00
1500.00

2875.00

5175.00

3850.00

6446.00

7970.00

9900.00

10500.00

9965.00

12750.00

r In charge of the work.


.
as applicable.
timates vide para.113 of
es as envisaged in para.45
Manufacture as per BIS NO: 1592/2003AS amended from time to time (MAZZA PROCESS) and supply of AC pressure pipes duly marked with B
cost of material, incidental, handling, loading and packing charges , transportation, unloading, stacking at Dept.. stores, Excise duty, VAT, OCTR
Levies.

Cost of AC Pipes & Conveyance Charges - 2017-18


Market 4600.00 Market 78500.00
Cement Rate as per SSR 4806.00 Fiber Rate as per SSR 78500.00
Variation -0.21 Variation 0.000
1 AC Class -15 : per RMT Sep-18

Outer diameter in

Total cost of Pipe


Variation in fiber
Thickness other

Cement Cost W

Add CP & OH on
ID) x 0.785x2.1 /
than at Ends in

Cost = W x IF x
(OD+ID) x (OD-
Dia of Pipes in

Actual Rate of
Weight /Rm =

Basic Rate of
Pipe per Rmt
Thickness at
Ends in mm

Pipe per Rmt


Variation in

charges @
x IC x 0.85
1000 (Kg.)

Add ST @
Transport

CED @
S N0

0.15
mm

mm

mm

pipe
W IC IF 10% 13.615% 0.00% 0%
1 80 mm dia 9.50 11.50 103.00 6.94 203.00 -1.210 0.000 201.79 20.18 27.47 0 0.00 249.44
2 100 mm dia 10.00 12.00 124.00 8.86 267.00 -1.550 0.000 265.45 26.55 36.14 0 0.00 328.14
3 125 mm dia 11.00 13.00 151.00 11.83 348.00 -2.070 0.000 345.93 34.59 47.10 0 0 427.62
4 150 mm dia 13.00 15.00 180.00 16.32 489.00 -2.860 0.000 486.14 48.61 66.19 0 0 600.94
5 200 mm dia 16.50 18.50 237.00 26.65 809.00 -4.670 0.000 804.33 80.43 109.51 0 0 994.27
6 250 mm dia 17.00 19.00 288.00 33.70 1026.00 -5.900 0.000 1020.10 102.01 138.89 0 0 1261.00
7 300 mm dia 20.00 22.00 344.00 46.71 1435.00 -8.180 0.000 1426.82 142.68 194.26 0 0 1763.76
8 350 mm dia 21.00 23.00 396.00 56.57 1747.00 -9.910 0.000 1737.09 173.71 236.50 0 0 2147.30
9 400 mm dia 24.00 26.00 452.00 73.04 2271.00 -12.790 0.000 2258.21 225.82 307.46 0 0 2791.49
10 450 mm dia 26.50 28.50 507.00 89.92 2701.00 -15.750 0.000 2685.25 268.53 365.60 0 0 3319.38
11 500 mm dia 29.00 31.00 562.00 108.54 3331.00 -19.010 0.000 3311.99 331.20 450.93 0 0 4094.12
12 600 mm dia 35.00 37.00 674.00 155.41 4737.00 -27.210 0.000 4709.79 470.98 641.24 0 0 5822.01
13 700 mm dia 37.00 39.00 778.00 190.05 6238.00 -33.280 0.000 6204.72 620.47 844.77 0 0 7669.96
14 750 mm dia 39.50 41.50 833.00 216.59 7108.00 -37.930 0.000 7070.07 707.01 962.59 0 0 8739.67
15 800 mm dia 42.50 44.50 889.00 247.80 8132.00 -43.390 0.000 8088.61 808.86 1101.26 0 0 9998.73
16 850 mm dia 45.00 47.00 944.00 278.00 9124.00 -48.680 0.000 9075.32 907.53 1235.60 0 0 11218.45
17 900 mm dia 47.50 49.50 999.00 309.92 10171.00 -54.270 0.000 10116.73 1011.67 1377.39 0 0 12505.79
18 1000 mm dia 53.00 55.00 1110.00 382.62 12555.00 -67.000 0.000 12488.00 1248.80 1700.24 0 0 15437.04
2 AC Class -20 : per RMT Sep-18
Market 4600.00 Market 78500.00
Cement Rate as per SSR 4806.00 Fiber Rate as per SSR 78500.00
Variation -0.21 Variation 0.000

Add CP & OH on
Variation in fiber
Thickness other

ID) x 0.785x2.1 /

W
than at Ends in

Outer diameter

(OD+ID) x (OD-
Dia of Pipes in

Actual Rate of
Basic Rate of
Weight /Rm =

Pipe per Rmt

W x IC x 0.85
Thickness at

Total cost of
Ends in mm

Cement Cost

Pipe per Rmt


Variation in

charges @
x IF x 0.15
1000 (Kg.)

Add ST @
Transport

CED @
in mm
S N0

Pipe
pipe
mm

mm

Cost =
W IC IF 13.615% 0.00% 0%
1 80 mm dia 11.00 13.00 106.00 7.97 223.00 -1.400 0.000 221.81 22.30 30.20 0.00 0.00 274.31
2 100 mm dia 13.50 15.50 131.00 11.80 340.00 -2.070 0.000 338.24 34.00 46.05 0.00 0.00 418.29
3 125 mm dia 14.00 16.00 157.00 14.88 432.00 -2.600 0.000 429.79 43.20 58.52 0.00 0.00 531.51
4 150 mm dia 16.50 18.50 187.00 20.56 610.00 -3.600 0.000 606.94 61.00 82.63 0.00 0.00 750.57
5 200 mm dia 22.00 24.00 248.00 35.45 1037.00 -6.210 0.000 1031.72 103.70 140.47 0.00 0.00 1275.89
6 250 mm dia 23.00 25.00 300.00 45.33 1331.00 -7.940 0.000 1324.25 133.10 180.30 0.00 0.00 1637.65
7 300 mm dia 27.00 29.00 358.00 62.91 1871.00 -11.020 0.000 1861.63 187.10 253.46 0.00 0.00 2302.19
8 350 mm dia 27.50 29.50 409.00 73.82 2273.00 -12.930 0.000 2262.01 227.30 307.97 0.00 0.00 2797.28
9 400 mm dia 32.00 34.00 468.00 97.30 2974.00 -17.040 0.000 2959.52 297.40 402.94 0.00 0.00 3659.86
10 450 mm dia 35.50 37.50 525.00 120.55 3587.00 -21.110 0.000 3569.06 358.70 485.93 0.00 0.00 4413.69
11 500 mm dia 39.00 41.00 582.00 146.26 4384.00 -25.610 0.000 4362.23 438.40 593.92 0.00 0.00 5394.55
12 600 mm dia 46.00 48.00 696.00 205.10 6190.00 -35.910 0.000 6159.48 619.00 838.61 0.00 0.00 7617.09
13 700 mm dia 50.00 52.00 804.00 257.85 8460.00 -45.150 0.000 8421.62 846.00 1146.60 0.00 0.00 10414.22
14 750 mm dia 54.00 56.00 862.00 297.63 9767.00 -52.110 0.000 9722.71 976.70 1323.75 0.00 0.00 12023.16
15 800 mm dia 57.50 59.50 919.00 337.22 11066.00 -59.050 0.000 11015.81 1106.60 1499.80 0.00 0.00 13622.21
16 850 mm dia 61.00 63.00 976.00 379.28 12448.00 -66.410 0.000 12391.55 1244.80 1687.11 0.00 0.00 15323.46
17 900 mm dia 64.50 66.50 1033.00 423.81 13908.00 -74.210 0.000 13844.92 1390.80 1884.99 0.00 0.00 17120.71
18 1000 mm dia 71.50 73.50 1147.00 520.28 17074.00 -91.100 0.000 16996.57 1707.40 2314.08 0.00 0.00 21018.05
A.C. COUPLINGS - for Class - 15 Pipes
1.A MANUFACTURE AS PER MANUFACTURERS SPECIFICATION (MAZZA PROCESS) AND SUPPLY OF A.C. COUPLINGS EXCLUDING COST OF
TO SUIT AC PRESSURE PIPES INCLUDING COST OF MATERIAL, INCIDENTAL HANDLING, PACKING TRANSPORTATION AND UNLOADING
RISK , EXCISE DUTY, VAT AND OTHER GOVT. LEVIES.

Market 4600.00 Market 78500.00


Cement Rate as per SSR 4806.00 Fiber Rate as per SSR 78500.00
Variation -0.21 Variation 0.000

Length x 0.785x 2.1

Basic Rate of Coller

W x IF
Variation in Cement
Cost W x IC x 0.85
Dia of collor in mm

OD+ID) x (OD-ID) x
Thickness at Ends

Outer diameter in
Inner diameter in

Variation in fiber
Weight /Each =

Actual Rate of
each coupling

Add CP & OH

Total cost of
/1000 (Kg.)

per each

Add ST @

Coupling
Length

CED @
in mm

x 0.15
mm

mm
SN

Cost =
W IC IF 13.615% 0.00% 0%
1 80 mm dia 16.50 103.50 136.50 160.00 2.089 96.00 -0.370 0.000 95.63 13.02 0 0.00 108.65
2 100 mm dia 17.00 125.00 159.00 160.00 2.547 123.00 -0.450 0.000 122.55 16.69 0 0.00 139.24
3 125 mm dia 18.00 151.00 187.00 160.00 3.209 155.00 -0.560 0.000 154.44 21.03 0 0.00 175.47
4 150 mm dia 20.00 180.50 220.50 160.00 4.231 180.00 -0.740 0.000 179.26 24.41 0 0.00 203.67
5 200 mm dia 23.50 237.50 284.50 180.00 7.280 331.00 -1.270 0.000 329.73 44.89 0 0.00 374.62
6 250 mm dia 24.00 288.50 336.50 180.00 8.902 387.00 -1.560 0.000 385.44 52.48 0 0.00 437.92
7 300 mm dia 27.00 344.50 398.50 180.00 11.905 506.00 -2.080 0.000 503.92 68.61 0 0.00 572.53
8 350 mm dia 29.50 396.00 455.00 180.00 14.899 654.00 -2.610 0.000 651.39 88.69 0 0.00 740.08
9 400 mm dia 32.50 452.00 517.00 220.00 22.843 1009.00 -4.000 0.000 1005.00 136.83 0 0.00 1141.83
10 450 mm dia 35.00 502.00 572.00 220.00 27.266 1208.00 -4.770 0.000 1203.23 163.82 0 0.00 1367.05
11 500 mm dia 37.50 558.50 633.50 220.00 32.423 1440.00 -5.680 0.000 1434.32 195.28 0 0.00 1629.60
12 600 mm dia 43.50 669.50 756.50 220.00 44.994 1776.00 -7.880 0.000 1768.12 240.73 0 0.00 2008.85
13 700 mm dia 45.50 773.00 864.00 220.00 54.026 2335.00 -9.460 0.000 2325.54 316.62 0 0.00 2642.16
14 750 mm dia 48.00 828.00 924.00 220.00 60.998 2635.00 -10.680 0.000 2624.32 357.30 0 0.00 2981.62
15 800 mm dia 51.00 884.00 986.00 220.00 69.176 2989.00 -12.110 0.000 2976.89 405.30 0 0.00 3382.19
16 850 mm dia 53.50 939.00 1046.00 220.00 77.029 3330.00 -13.490 0.000 3316.51 451.54 0 0.00 3768.05
17 900 mm dia 56.00 994.00 1106.00 220.00 85.300 3684.00 -14.940 0.000 3669.06 499.54 0 0.00 4168.60
18 1000 mm dia 61.50 1105.00 1228.00 220.00 104.071 4497.00 -18.220 0.000 4478.78 609.79 0 0.00 5088.57
A.C. COUPLINGS - for Class - 20 Pipes
2 MANUFACTURE AS PER MANUFACTURERS SPECIFICATION (MAZZA PROCESS) AND SUPPLY OF A.C. COUPLINGS EXCLUDING COST O
TO SUIT AC PRESSURE PIPES INCLUDING COST OF MATERIAL, INCIDENTAL HANDLING, PACKING TRANSPORTATION AND UNLOADING
RISK , EXCISE DUTY, VAT AND OTHER GOVT. LEVIES.

Market 4600.00 Market 78500.00


Cement Rate as per SSR 4806.00 Fiber Rate as per SSR 78500.00
Variation -0.21 Variation 0.000
Thickness at Ends in mm

Variation in Cement Cost


Weight /Each = OD+ID) x

Basic Rate of Coller per

Total cost of Coupling


0.785x 2.1 /1000 (Kg.)

Variation in fiber Cost =


Outer diameter in mm
Inner diameter in mm

Actual Rate of each


Dia of collor in mm

(OD-ID) x Length x

W x IF x 0.15
W x IC x 0.85

Add CP & OH

Add ST @
coupling
Length

CED @
each
SN

W IC IF 13.62% 0.00% 0%
1 80 mm dia 18.00 105.50 141.50 160.00 2.35 102.00 -0.410 0.000 101.59 13.83 0 0.00 115.42
2 100 mm dia 20.50 130.50 171.50 160.00 3.27 134.00 -0.570 0.000 133.43 18.17 0 0.00 151.60
3 125 mm dia 21.00 156.50 198.50 160.00 3.93 169.00 -0.690 0.000 168.31 22.92 0 0.00 191.23
4 150 mm dia 23.50 187.00 234.00 160.00 5.22 226.00 -0.910 0.000 225.09 30.65 0 0.00 255.74
5 200 mm dia 29.00 246.50 304.50 180.00 9.48 365.00 -1.660 0.000 363.34 49.47 0 0.00 412.81
6 250 mm dia 30.00 298.50 358.50 180.00 11.70 490.00 -2.050 0.000 487.95 66.43 0 0.00 554.38
7 300 mm dia 34.00 356.50 424.50 180.00 15.76 656.00 -2.760 0.000 653.24 88.94 0 0.00 742.18
8 350 mm dia 36.00 409.00 481.00 180.00 19.01 845.00 -3.330 0.000 841.67 114.59 0 0.00 956.26
9 400 mm dia 40.50 467.00 548.00 220.00 29.82 1316.00 -5.220 0.000 1310.78 178.46 0 0.00 1489.24
10 450 mm dia 44.00 519.00 607.00 220.00 35.94 1592.00 -6.290 0.000 1585.71 215.89 0 0.00 1801.60
11 500 mm dia 47.50 576.50 671.50 220.00 43.00 1924.00 -7.530 0.000 1916.47 260.93 0 0.00 2177.40
12 600 mm dia 54.50 690.50 799.50 220.00 58.90 2231.00 -10.310 0.000 2220.69 302.35 0 0.00 2523.04
13 700 mm dia 58.50 799.00 916.00 220.00 72.77 3145.00 -12.740 0.000 3132.26 426.46 0 0.00 3558.72
14 750 mm dia 62.50 857.00 982.00 220.00 83.37 3601.00 -14.600 0.000 3586.40 488.29 0 0.00 4074.69
15 800 mm dia 66.00 914.00 1046.00 220.00 93.83 4052.00 -16.430 0.000 4035.57 549.44 0 0.00 4585.01
16 850 mm dia 69.50 971.00 1110.00 220.00 104.91 4533.00 -18.370 0.000 4514.63 614.67 0 0.00 5129.30
17 900 mm dia 73.00 1028.00 1174.00 220.00 116.60 5040.00 -20.420 0.000 5019.58 683.42 0 0.00 5703.00
18 1000 mm dia 80.00 1142.00 1302.00 220.00 141.82 6127.00 -24.830 0.000 6102.17 830.81 0 0.00 6932.98
SCHEDULE OF RATE FOR SUPLY OF RUBBER RINGS MANUFACTURED AS PER BIS:
5382/1988 WITH BIS MARK EMBOSSED PER EACH SET SUITABLE FOR A.C. COUPLINGS
INCLUDING COST OF MATERIAL, INCIDENTAL, HANDLING, PACKING, TRANSPORTATION
AND UNLOADING AT SITE TRANSIT RISK ETC.,

RUBBER RINGS for Class -15,20 & 25 Pipes


Rate
Rate
Dia of pipe in Basic Add Add CP Add VAT excluding
SN Add ST @ Rate including
mm Rate CED @ & OH @ Over
Over heads
heads
80 mm dia 0.00% 0.00% 13.62% 0.00%
100 mm dia 71.00 0.00 0.00 9.67 80.67 0 71.00 80.67
125 mm dia 87.00 0.00 0.00 11.85 98.85 0 87.00 98.85
150 mm dia 113.00 0.00 0.00 15.38 128.38 0 113.00 128.38
200 mm dia 143.00 0.00 0.00 19.47 162.47 0 143.00 162.47
250 mm dia 149.00 0.00 0.00 20.29 169.29 0 149.00 169.29
300 mm dia 172.00 0.00 0.00 23.42 195.42 0 172.00 195.42
350 mm dia 172.00 0.00 0.00 23.42 195.42 0 172.00 195.42
400 mm dia 195.00 0.00 0.00 26.55 221.55 0 195.00 221.55
450 mm dia 239.00 0.00 0.00 32.54 271.54 0 239.00 271.54
500 mm dia 280.00 0.00 0.00 38.12 318.12 0 280.00 318.12
600 mm dia 324.00 0.00 0.00 44.11 368.11 0 324.00 368.11
368.00 0.00 0.00 50.10 418.10 0 368.00 418.10
700 mm dia 763.00 0.00 0.00 103.88 866.88 0 763.00 866.88
750 mm dia 793.00 0.00 0.00 107.97 900.97 0 793.00 900.97
800 mm dia 852.00 0.00 0.00 116.00 968.00 0 852.00 968.00
850 mm dia 949.00 0.00 0.00 129.21 1078.21 0 949.00 1078.21
900 mm dia 998.00 0.00 0.00 135.88 1133.88 0 998.00 1133.88
1000 mm dia 1106.00 0.00 0.00 150.58 1256.58 0 1106.00 1256.58
y marked with BIS mark, including
duty, VAT, OCTROI and other Govt.
Rate excluding

Rate including
Over heads

Over heads
Add VAT @

0%
0.00 221.97 249.44
0.00 292.00 328.14
0.00 380.52 427.62
0.00 534.75 600.94
0.00 884.76 994.27
0.00 1122.11 1261.00
0.00 1569.50 1763.76
0.00 1910.80 2147.30
0.00 2484.03 2791.49
0.00 2953.78 3319.38
0.00 3643.19 4094.12
0.00 5180.77 5822.01
0.00 6825.19 7669.96
0.00 7777.08 8739.67
0.00 8897.47 9998.73
0.00 9982.85 11218.45
0.00 11128.40 12505.79
0.00 13736.80 15437.04
Rate excluding

Rate including
Over heads

Over heads
Add VAT @

0%
0.00 244.11 274.31
0.00 372.24 418.29
0.00 472.99 531.51
0.00 667.94 750.57
0.00 1135.42 1275.89
0.00 1457.35 1637.65
0.00 2048.73 2302.19
0.00 2489.31 2797.28
0.00 3256.92 3659.86
0.00 3927.76 4413.69
0.00 4800.63 5394.55
0.00 6778.48 7617.09
0.00 9267.62 10414.22
0.00 10699.41 12023.16
0.00 12122.41 13622.21
0.00 13636.35 15323.46
0.00 15235.72 17120.71
0.00 18703.97 21018.05
UDING COST OF RUBBER RINGS
ND UNLOADING AT SITE TRANSIT

Rate including Over


Rate excluding
Over heads
Add VAT @

heads

0%
0.00 95.63 108.65
0.00 122.55 139.24
0.00 154.44 175.47
0.00 179.26 203.67
0.00 329.73 374.62
0.00 385.44 437.92
0.00 503.92 572.53
0.00 651.39 740.08
0.00 1005.00 1141.83
0.00 1203.23 1367.05
0.00 1434.32 1629.60
0.00 1768.12 2008.85
0.00 2325.54 2642.16
0.00 2624.32 2981.62
0.00 2976.89 3382.19
0.00 3316.51 3768.05
0.00 3669.06 4168.60
0.00 4478.78 5088.57
UDING COST OF RUBBER RINGS
ND UNLOADING AT SITE TRANSIT
Rate excluding Over

Rate including Over


Add VAT @

heads

heads

0%
0.00 101.59 115.42
0.00 133.43 151.60
0.00 168.31 191.23
0.00 225.09 255.74
0.00 363.34 412.81
0.00 487.95 554.38
0.00 653.24 742.18
0.00 841.67 956.26
0.00 1310.78 1489.24
0.00 1585.71 1801.60
0.00 1916.47 2177.40
0.00 2220.69 2523.04
0.00 3132.26 3558.72
0.00 3586.40 4074.69
0.00 4035.57 4585.01
0.00 4514.63 5129.30
0.00 5019.58 5703.00
0.00 6102.17 6932.98
Page 1379 of 2191

Manufacture,supply and delivery of RCC Plain Ended Pipes confirming to B.I.S. 458/2003 ex-Factory, ( Rate per Meter of effective length
including Transportation, Central Excice Duty, Sales Tax but Excluding VAT etc.complete.
Cost of RCC Plain Ended NP2 & NP3 Pipes & Conveyance Charges - 2017-18

Market 9/1/2018 4600.00 Market 9/1/2018 46000.00 10 Km


Cement Rate as per SSR 4806.00 MS rods Rate as per SSR 32636.00
Variation per Kg -0.21 Variation per Kg 13.364
1 RCC NP2 PE Pipes: per RMT

Basic Rate up
Rate for
Rate of Cement Variation Variation Actual to 5 Rate
Dia of MS rods every Add over
S Pipe per required in in MS Rate of Kms Total lead Add VAT & excluding
Pipes in required additional 1 heads on Sub-total
N0 Rmt per 1 Cement rods Pipe per Lead charges LC @ Over
mm per 1 Rmt KM lead or pipe
Rmt Cost Cost Rmt heads
part thereof
( Table-1) (Table-6)

P1 Wc R1 Ws R2 R1+R2 13.62% 0%
1 100mm 165.00 3.60 -0.74 0.77 10.29 174.55 4.60 0.15 5.35 23.76 203.66 0.00 179.90
2 150mm 198.00 3.60 -0.74 0.83 11.09 208.35 6.90 0.30 8.40 28.37 245.12 0.00 216.75
3 200mm 239.00 7.20 -1.48 0.97 12.96 250.48 9.20 0.30 10.70 34.10 295.28 0.00 261.18
4 225mm 258.00 7.20 -1.48 1.05 14.03 270.55 10.40 0.46 12.70 36.84 320.09 0.00 283.25
5 250mm 275.00 7.20 -1.48 1.17 15.64 289.16 11.60 0.46 13.90 39.37 342.43 0.00 303.06
6 300mm 395.00 10.80 -2.22 1.57 20.98 413.76 16.20 0.61 19.25 56.33 489.34 0.00 433.01
7 350mm 494.00 14.40 -2.97 1.91 25.53 516.56 23.10 1.39 30.05 70.33 616.94 0.00 546.61
8 400mm 568.00 14.40 -2.97 2.27 30.34 595.37 25.40 1.53 33.05 81.06 709.48 0.00 628.42
9 450mm 694.00 18.00 -3.71 2.75 36.75 727.04 33.50 1.85 42.75 98.99 868.78 0.00 769.79
10 500mm 760.00 21.60 -4.45 3.24 43.30 798.85 35.80 2.15 46.55 108.76 954.16 0.00 845.40
11 600mm 1134.00 32.40 -6.67 4.25 56.80 1184.13 52.00 3.38 68.90 161.22 1414.25 0.00 1253.03
12 700mm 1447.00 43.20 -8.90 5.82 77.78 1515.88 65.80 4.77 89.65 206.39 1811.92 0.00 1605.53
13 800mm 1767.00 50.40 -10.38 7.93 105.98 1862.60 77.40 4.77 101.25 253.59 2217.44 0.00 1963.85
14 900mm 2214.00 68.00 -14.01 10.47 139.92 2339.91 88.90 4.77 112.75 318.58 2771.24 0.00 2452.66
15 1000mm 2690.00 80.00 -16.48 12.45 166.38 2839.90 131.70 9.83 180.85 386.65 3407.40 0.00 3020.75
16 1100mm 3207.00 96.00 -19.78 14.50 193.78 3381.00 144.40 9.83 193.55 460.32 4034.87 0.00 3574.55

data-RCC-PE & SS-pipes 447524687.xlsx


Page 1380 of 2191

17 1200mm 3818.00 112.00 -23.07 17.23 230.26 4025.19 164.00 10.46 216.30 548.03 4789.52 0.00 4241.49
18 1400mm 5196.00 140.00 -28.84 23.21 310.18 5477.34 197.50 10.46 249.80 745.74 6472.88 0.00 5727.14
19 1600mm 6007.00 168.00 -34.61 28.92 386.49 6358.88 228.70 10.46 281.00 865.76 7505.64 0.00 6639.88
20 1800mm 7883.00 216.00 -44.50 36.26 484.58 8323.08 263.30 10.46 315.60 1133.19 9771.87 0.00 8638.68

data-RCC-PE & SS-pipes 447524687.xlsx


Page 1381 of 2191

2 RCC NP3 PE Pipes: per RMT

Basic Rate up
Rate for
Rate of Cement Variation Variation Actual to 5 Rate
Dia of MS rods every Add over
Pipe per required in in MS Rate of Kms Total lead Add VAT & excluding
S N Pipes in required additional 1 heads on Sub-total
Rmt per 1 Cement rods Pipe per Lead charges LC @ Over
mm per 1 Rmt KM lead or pipe cost
Rmt Cost Cost Rmt heads
part thereof
( Table-1) (Table-6)

P1 Wc R1 Ws R2 R1+R2 13.62% 0%
1 300mm 901.00 14.40 -2.97 2.58 34.48 932.51 45.00 1.24 51.20 126.96 1110.67 0.00 983.71
2 350mm 1122.00 25.20 -5.19 3.73 49.85 1166.66 48.50 1.39 55.45 158.84 1380.95 0.00 1222.11
3 400mm 1240.00 32.40 -6.67 4.08 54.53 1287.86 57.80 1.85 67.05 175.34 1530.25 0.00 1354.91
4 450mm 1419.00 39.60 -8.16 4.57 61.07 1471.91 62.40 2.15 73.15 200.40 1745.46 0.00 1545.06
5 500mm 1537.00 46.80 -9.64 5.60 74.84 1602.20 68.10 2.15 78.85 218.14 1899.19 0.00 1681.05
7 600mm 2306.00 57.60 -11.87 8.19 109.45 2403.58 102.80 4.77 126.65 327.25 2857.48 0.00 2530.23
9 700mm 2849.00 75.60 -15.57 11.45 153.02 2986.45 114.30 5.54 142.00 406.61 3535.06 0.00 3128.45
10 800mm 3754.00 97.20 -20.02 15.70 209.81 3943.79 137.40 5.54 165.10 536.95 4645.84 0.00 4108.89
11 900mm 4698.00 124.00 -25.54 20.96 280.11 4952.57 180.20 10.46 232.50 674.29 5859.36 0.00 5185.07
12 1000mm 5856.00 160.00 -32.96 24.18 323.14 6146.18 217.10 10.46 269.40 836.80 7252.38 0.00 6415.58
13 1100mm 6875.00 184.00 -37.90 30.25 404.26 7241.36 235.60 11.38 292.50 985.91 8519.77 0.00 7533.86
14 1200mm 8084.00 208.00 -42.85 37.12 496.07 8537.22 263.30 11.38 320.20 1162.34 10019.76 0.00 8857.42
15 1400mm 10428.00 272.00 -56.03 49.76 664.99 11036.96 358.10 11.84 417.30 1502.68 12956.94 0.00 11454.26
16 1600mm 13465.00 364.00 -74.98 68.95 921.45 14311.47 429.70 11.84 488.90 1948.51 16748.88 0.00 14800.37
17 1800mm 17778.00 448.00 -92.29 96.46 1289.09 18974.80 572.90 16.61 655.95 2583.42 22214.17 0.00 19630.75

data-RCC-PE & SS-pipes 447524687.xlsx


Page 1382 of 2191

2 RCC NP4 PE Pipes: per RMT

Basic Rate up
Rate for
Rate of Cement Variation Variation Actual to 5 Rate
Dia of MS rods every Add over
Pipe per required in in MS Rate of Kms Total lead Add VAT & excluding
S N Pipes in required additional 1 heads on Sub-total
Rmt per 1 Cement rods Pipe per Lead charges LC @ Over
mm per 1 Rmt KM lead or pipe cost
Rmt Cost Cost Rmt heads
part thereof
( Table-1) (Table-6)

P1 Wc R1 Ws R2 R1+R2 86576.15% 0%
1 300mm 915.00 10.80 -2.22 2.53 33.81 946.59 45.00 1.24 51.20 128.88 1126.67 0.00 997.79
2 350mm 1141.00 14.40 -2.97 3.15 42.10 1180.13 48.50 1.39 55.45 160.67 1396.25 0.00 1235.58
3 400mm 1265.00 14.40 -2.97 3.83 51.18 1313.21 57.80 1.85 67.05 178.79 1559.05 0.00 1380.26
4 450mm 1434.00 18.00 -3.71 4.64 62.01 1492.30 62.40 2.15 73.15 203.18 1768.63 0.00 1565.45
5 500mm 1757.00 21.60 -4.45 5.50 73.50 1826.05 68.10 2.15 78.85 248.62 2153.52 0.00 1904.90
7 600mm 2704.00 28.80 -5.93 7.97 106.51 2804.58 102.80 4.77 126.65 381.84 3313.07 0.00 2931.23
9 700mm 3595.00 32.40 -6.67 10.37 138.58 3726.91 114.30 5.54 142.00 507.42 4376.33 0.00 3868.91
10 800mm 4678.00 43.20 -8.90 13.16 175.87 4844.97 137.40 5.54 165.10 659.64 5669.71 0.00 5010.07
11 900mm 5823.00 60.00 -12.36 16.34 218.37 6029.01 180.20 10.46 232.50 820.85 7082.36 0.00 6261.51
12 1000mm 7954.00 72.00 -14.83 20.40 272.63 8211.80 217.10 10.46 269.40 1118.04 9599.24 0.00 8481.20
13 1100mm 9193.00 88.00 -18.13 24.64 329.29 9504.16 235.60 11.38 292.50 1293.99 11090.65 0.00 9796.66
14 1200mm 10735.00 104.00 -21.42 28.58 381.94 11095.52 263.30 11.38 320.20 1510.66 12926.38 0.00 11415.72
15 1400mm 14789.00 0.00 0.00 0.00 0.00 14789.00 358.10 11.84 417.30 2013.52 17219.82 0.00 15206.30
16 1600mm 17647.00 0.00 0.00 0.00 0.00 17647.00 429.70 11.84 488.90 2402.64 20538.54 0.00 18135.90
17 1800mm 23573.00 0.00 0.00 0.00 0.00 23573.00 572.90 16.61 655.95 3209.46 27438.41 0.00 24228.95

data-RCC-PE & SS-pipes 447524687.xlsx


Page 1383 of 2191

3
Manufacture,supply and delivery of RCC Collars confirming to B.I.S. 458/ 2003 (RATE PER EACH
COLLAR ) suitable for RCC Plain Ended Pipes including Transportation,Central Excice Duty, Sales Tax but
Excluding VAT etc.complete.

Collars for NP2 Pipes 9/1/2018

Basic Variation MS rods Variation Rate


Dia of Cement Actual Add over
Rate per in required in MS excluding
S N Pipes in required Rate per heads on CED @ Add ST @
each Cement per 1 rods Over
mm per each each Collar
(table -2) Cost each Cost heads

P1 Wc R1 Ws R2 R1+R2 13.62% 0.00% 0.00%


1 100mm 44.00 0.72 0.000 0.15 0.002 44.00 5.99 0.00 0.00 44.00
2 150mm 47.00 0.72 0.000 0.16 0.002 47.00 6.40 0.00 0.00 47.00
3 200mm 65.00 0.72 0.000 0.18 0.002 65.00 8.85 0.00 0.00 65.00
4 225mm 66.00 0.72 0.000 0.20 0.003 66.00 8.99 0.00 0.00 66.00
5 250mm 75.00 0.72 0.000 0.22 0.003 75.00 10.21 0.00 0.00 75.00
6 300mm 99.00 1.08 0.000 0.24 0.003 99.00 13.48 0.00 0.00 99.00
7 350mm 121.00 1.08 0.000 0.33 0.004 121.00 16.47 0.00 0.00 121.00
8 400mm 135.00 1.08 0.000 0.36 0.005 135.01 18.38 0.00 0.00 135.01
9 450mm 211.00 1.80 0.000 0.38 0.005 211.01 28.73 0.00 0.00 211.01
10 500mm 240.00 1.80 0.000 0.55 0.007 240.01 32.68 0.00 0.00 240.01
11 600mm 327.00 2.16 0.000 0.75 0.010 327.01 44.52 0.00 0.00 327.01
12 700mm 422.00 2.16 0.000 1.28 0.017 422.02 57.46 0.00 0.00 422.02
13 800mm 592.00 2.52 -0.001 2.08 0.028 592.03 80.60 0.00 0.00 592.03
14 900mm 709.00 3.20 -0.001 2.28 0.030 709.03 96.53 0.00 0.00 709.03
15 1000mm 830.00 3.60 -0.001 2.58 0.034 830.03 113.01 0.00 0.00 830.03
16 1100mm 1014.00 4.00 -0.001 3.72 0.050 1014.05 138.06 0.00 0.00 1014.05
17 1200mm 1226.00 4.40 -0.001 4.44 0.059 1226.06 166.93 0.00 0.00 1226.06
18 1400mm 1584.00 5.20 -0.001 5.58 0.075 1584.07 215.67 0.00 0.00 1584.07
19 1600mm 2021.00 5.60 -0.001 7.22 0.096 2021.10 275.17 0.00 0.00 2021.10

data-RCC-PE & SS-pipes 447524687.xlsx


Page 1384 of 2191

20 1800mm 2079.00 6.80 -0.001 9.67 0.129 2079.13 283.07 0.00 0.00 2079.13

data-RCC-PE & SS-pipes 447524687.xlsx


Page 1385 of 2191

4 Manufacture,supply and delivery of RCC Collars confirming to B.I.S. 458/ 2003 (RATE PER EACH
COLLAR ) suitable for RCC Plain Ended Pipes including Transportation,Central Excice Duty, Sales Tax but
Excluding VAT etc.complete. ( for NP 3 pipes )
Collars for NP3 Pipes 9/1/2018

Basic Variation MS rods Variation Rate


Dia of Cement Actual Add over
Rate per in required in MS excluding
S N Pipes in required Rate per heads on CED @ Add ST @
each Cement per 1 rods Over
mm per each each Collar
( table -2 ) Cost each Cost heads

P1 Wc R1 Ws R2 R1+R2 13.62% 0.00% 0.00%


6 300mm 140.00 1.08 -0.22 0.33 4.41 144.19 19.63 0.00 0.00 144.19
7 350mm 174.00 1.08 -0.22 0.36 4.81 178.59 24.32 0.00 0.00 178.59
8 400mm 200.00 1.80 -0.37 0.38 5.08 204.71 27.87 0.00 0.00 204.71
9 450mm 266.00 1.80 -0.37 0.55 7.35 272.98 37.17 0.00 0.00 272.98
10 500mm 318.00 2.16 -0.45 0.75 10.02 327.58 44.60 0.00 0.00 327.58
11 600mm 414.00 2.16 -0.45 1.28 17.11 430.67 58.64 0.00 0.00 430.67
12 700mm 553.00 2.52 -0.52 2.08 27.80 580.28 79.01 0.00 0.00 580.28
13 800mm 705.00 3.20 -0.66 2.28 30.47 734.81 100.04 0.00 0.00 734.81
14 900mm 823.00 3.60 -0.74 2.58 34.48 856.74 116.65 0.00 0.00 856.74
15 1000mm 1028.00 4.00 -0.82 3.72 49.71 1076.89 146.62 0.00 0.00 1076.89
16 1100mm 1299.00 4.40 -0.91 4.44 59.34 1357.43 184.81 0.00 0.00 1357.43
17 1200mm 1625.00 5.20 -1.07 5.58 74.57 1698.50 231.25 0.00 0.00 1698.50
18 1400mm 2056.00 5.60 -1.15 7.22 96.49 2151.34 292.90 0.00 0.00 2151.34
19 1600mm 2630.00 6.80 -1.40 9.67 129.23 2757.83 375.48 0.00 0.00 2757.83
20 1800mm 3380.00 7.60 -1.57 13.15 175.74 3554.17 483.90 0.00 0.00 3554.17

data-RCC-PE & SS-pipes 447524687.xlsx


Page 1386 of 2191

2* ∏ 360 up to 800
6.286 400 above 800
NP 2 Class PE Pipes Collars for NP 2 Class PE Pipes

Dia of Barral Volume Steel Qty Dia of Dia of Barral


Radius Cement Length in Cement Steel Qty in
S.N Pipe in Thickness in Kgs- pipe in Collar in Thickness
of Pipe Qty in Kg Mts Qty in Kg Kgs-NP2
Mts in Mts per 1 Rmt NP2 Mts Mts in Mts

1 0.10 0.025 0.06 0.01 3.60 0.77 0.10 0.13 0.15 0.025 0.72 0.15
2 0.15 0.025 0.09 0.01 3.60 0.83 0.15 0.18 0.15 0.025 0.72 0.16
3 0.20 0.025 0.11 0.02 7.20 0.97 0.20 0.23 0.15 0.025 0.72 0.18
4 0.225 0.025 0.13 0.02 7.20 1.05 0.225 0.25 0.15 0.025 0.72 0.20
5 0.25 0.025 0.14 0.02 7.20 1.17 0.25 0.28 0.15 0.025 0.72 0.22
6 0.30 0.030 0.17 0.03 10.80 1.57 0.30 0.33 0.15 0.03 1.08 0.24
7 0.35 0.032 0.19 0.04 14.40 1.91 0.35 0.38 0.15 0.032 1.08 0.33
8 0.40 0.032 0.22 0.04 14.40 2.27 0.40 0.43 0.15 0.032 1.08 0.36
9 0.45 0.035 0.24 0.05 18.00 2.75 0.45 0.488 0.20 0.035 1.80 0.38
10 0.50 0.035 0.27 0.06 21.60 3.24 0.50 0.538 0.20 0.035 1.80 0.55
11 0.60 0.045 0.32 0.09 32.40 4.25 0.60 0.638 0.20 0.04 2.16 0.75
12 0.70 0.05 0.38 0.12 43.20 5.82 0.70 0.738 0.20 0.04 2.16 1.28
13 0.80 0.05 0.43 0.14 50.40 7.93 0.80 0.838 0.20 0.045 2.52 2.08
14 0.90 0.055 0.48 0.17 68.00 10.47 0.90 0.938 0.20 0.05 3.20 2.28
15 1.00 0.06 0.53 0.2 80.00 12.45 1.00 1.038 0.20 0.055 3.60 2.58
16 1.10 0.065 0.58 0.24 96.00 14.50 1.10 1.138 0.20 0.06 4.00 3.72
17 1.20 0.07 0.64 0.28 112.00 17.23 1.20 1.238 0.20 0.065 4.40 4.44
18 1.40 0.075 0.74 0.35 140.00 23.21 1.40 1.438 0.20 0.075 5.20 5.58
19 1.60 0.08 0.84 0.42 168.00 28.92 1.60 1.638 0.20 0.08 5.60 7.22
20 1.80 0.09 0.95 0.54 216.00 36.26 1.80 1.838 0.20 0.09 6.80 9.67
21 2.00 0.10 1.05 0.66 264.00 50.42 2.00 2.038 0.20 0.10 7.60 13.15
22 2.20 0.11 1.16 0.80 320.00 61.65 2.20 2.238 0.20 0.11 8.80 14.30
Vide Page No.7 of IS 458.2003 IS 458 -2003 Pg.28

data-RCC-PE & SS-pipes 447524687.xlsx


Page 1387 of 2191

2* ∏ 360 up to 800
6.286 400 above 800
NP 3 Class Pipes Collars for NP 3 Class PE Pipes

Dia of Barral Volume Steel Qty Dia of Dia of Barral


Radius Cement Length in Cement Steel Qty in
S.N Pipe in Thickness in Kgs- Pipe in Collar in Thickness
of Pipe Qty in Kg Mts Qty in Kg Kgs-NP2
Mts in Mts per 1 Rmt NP3 Mts Mts in Mts

1 0.30 0.04 0.17 0.04 14.40 2.58 0.30 0.33 0.15 0.03 1.08 0.33
2 0.35 0.055 0.20 0.07 25.20 3.73 0.35 0.39 0.15 0.035 1.08 0.36
3 0.40 0.06 0.23 0.09 32.40 4.08 0.40 0.44 0.20 0.035 1.80 0.38
4 0.45 0.065 0.26 0.11 39.60 4.57 0.45 0.49 0.20 0.035 1.80 0.55
5 0.50 0.07 0.29 0.13 46.80 5.60 0.50 0.54 0.20 0.04 2.16 0.75
6 0.60 0.075 0.34 0.16 57.60 8.19 0.60 0.64 0.20 0.04 2.16 1.28
7 0.70 0.085 0.39 0.21 75.60 11.45 0.70 0.74 0.20 0.045 2.52 2.08
8 0.80 0.095 0.45 0.27 97.20 15.70 0.80 0.84 0.20 0.05 3.20 2.28
9 0.90 0.10 0.50 0.31 124.00 20.96 0.90 0.94 0.20 0.055 3.60 2.58
10 1.00 0.115 0.56 0.4 160.00 24.18 1.00 1.04 0.20 0.06 4.00 3.72
11 1.10 0.12 0.61 0.46 184.00 30.25 1.10 1.14 0.20 0.065 4.40 4.44
12 1.20 0.125 0.66 0.52 208.00 37.12 1.20 1.24 0.20 0.075 5.20 5.58
13 1.40 0.14 0.77 0.68 272.00 49.76 1.40 1.44 0.20 0.08 5.60 7.22
14 1.60 0.165 0.88 0.91 364.00 68.95 1.60 1.64 0.20 0.09 6.80 9.67
15 1.80 0.18 0.99 1.12 448.00 96.46 1.80 1.84 0.20 0.10 7.60 13.15
16 2.00 0.19 1.1 1.31 524.00 107.26 2.00 2.04 0.20 0.11 8.80 14.30
17 2.20 0.21 1.21 1.6 640.00 142.66
18 2.40 0.225 1.31 1.85 740.00 190.64
Vide Page No.8 of IS 458.2003 Vide Page No.8 of IS 458.1988 - Note.2

data-RCC-PE & SS-pipes 447524687.xlsx


Page 1388 of 2191

2* ∏ 360 up to 800
6.286 400 above 800
NP 4 Class Pipes Collars for NP 4 Class PE Pipes

Dia of Barral Volume Steel Qty Dia of Dia of Barral


Radius Cement Length in Cement Steel Qty in
S.N Pipe in Thickness in Kgs- Pipe in Collar in Thickness
of Pipe Qty in Kg Mts Qty in Kg Kgs-NP2
Mts in Mts per 1 Rmt NP3 Mts Mts in Mts

1 0.30 0.03 0.17 0.03 10.80 2.53 0.30 0.33 0.15 0.03 1.08 0.33
2 0.35 0.032 0.19 0.04 14.40 3.15 0.35 0.39 0.15 0.035 1.08 0.36
3 0.40 0.032 0.22 0.04 14.40 3.83 0.40 0.44 0.20 0.035 1.80 0.38
4 0.45 0.035 0.24 0.05 18.00 4.64 0.45 0.49 0.20 0.035 1.80 0.55
5 0.50 0.035 0.27 0.06 21.60 5.50 0.50 0.54 0.20 0.04 2.16 0.75
6 0.60 0.04 0.32 0.08 28.80 7.97 0.60 0.64 0.20 0.04 2.16 1.28
7 0.70 0.04 0.37 0.09 32.40 10.37 0.70 0.74 0.20 0.045 2.52 2.08
8 0.80 0.045 0.42 0.12 43.20 13.16 0.80 0.84 0.20 0.05 3.20 2.28
9 0.90 0.05 0.48 0.15 60.00 16.34 0.90 0.94 0.20 0.055 3.60 2.58
10 1.00 0.055 0.53 0.18 72.00 20.40 1.00 1.04 0.20 0.06 4.00 3.72
11 1.10 0.06 0.58 0.22 88.00 24.64 1.10 1.14 0.20 0.065 4.40 4.44
12 1.20 0.065 0.63 0.26 104.00 28.58 1.20 1.24 0.20 0.075 5.20 5.58
13 1.40 1.40 1.44 0.20 0.08 5.60 7.22
14 1.60 1.60 1.64 0.20 0.09 6.80 9.67
15 1.80 1.80 1.84 0.20 0.10 7.60 13.15
16 2.00 2.00 2.04 0.20 0.11 8.80 14.30
17 2.20
18 2.40
Vide Page No.9 of IS 458.2003 Vide Page No.8 of IS 458.1988 - Note.2

data-RCC-PE & SS-pipes 447524687.xlsx


Page 1389 of 2191

es confirming to B.I.S. 458/2003 ex-Factory, ( Rate per Meter of effective length)


Excice Duty, Sales Tax but Excluding VAT etc.complete.
& NP3 Pipes & Conveyance Charges - 2017-18

Rate
including
Over heads

203.66
245.12
295.28
320.09
342.43
489.34
616.94
709.48
868.78
954.16
1414.25
1811.92
2217.44
2771.24
3407.40
4034.87

data-RCC-PE & SS-pipes 447524687.xlsx


Page 1390 of 2191

4789.52
6472.88
7505.64
9771.87

data-RCC-PE & SS-pipes 447524687.xlsx


Page 1391 of 2191

Rate
including
Over heads

1110.67
1380.95
1530.25
1745.46
1899.19
2857.48
3535.06
4645.84
5859.36
7252.38
8519.77
10019.76
12956.94
16748.88
22214.17

data-RCC-PE & SS-pipes 447524687.xlsx


Page 1392 of 2191

Rate
including
Over heads

1126.67
1396.25
1559.05
1768.63
2153.52
3313.07
4376.33
5669.71
7082.36
9599.24
11090.65
12926.38

data-RCC-PE & SS-pipes 447524687.xlsx


BUILDINGS - SoR : 2018 - 2019

CIVIL ITEMS
Sl. No. ITEM CODE DESCRIPTION OF THE ITEM
A SECTION BRICKS & BUILDING BLOCKS
I SUB-SECTION ORDINARY CLAY BRICKS
1 TBSC-A.I-01 Common burnt clay bricks of class as per Table -1 of IS: 1077-1992 Non-Modular or
traditional size 23 x 11 x 7 cm (ex-quarry price - excluding cost of conveyance, loading
& unloading)
2 TBSC-A.I-02 Common burnt clay bricks of class as per Table -1 of IS: 1077-1992 Modular or
traditional size 19 x 9 x 9 cm (ex-quarry price - excluding cost of conveyance, loading
& unloading)
II SUB-SECTION FLY-ASH CEMENT / LIME SOLID BLOCKS
3 TBSC-A.II-01 Fly ash cement / lime solid blocks with compressive strength of 75 kg/sq.cm -
IS:12894-1990 - CLASS - 7.5 (ex-quarry price - excluding cost of conveyance, loading
& unloading) 290 x 225 x 140 mm
4 TBSC-A.II-02 Fly ash cement / lime solid blocks with compressive strength of 75 kg/sq.cm -
IS:12894-1990 - CLASS - 7.5 (ex-quarry price - excluding cost of conveyance, loading
& unloading) 290 x 200 x 140 mm
5 TBSC-A.II-03 Fly ash cement / lime solid blocks with compressive strength of 75 kg/sq.cm -
IS:12894-1990 - CLASS - 7.5 (ex-quarry price - excluding cost of conveyance, loading
& unloading) 290 x 150 x 140 mm
6 TBSC-A.II-04 Fly ash cement / lime solid blocks with compressive strength of 75 kg/sq.cm -
IS:12894-1990 - CLASS - 7.5 (ex-quarry price - excluding cost of conveyance, loading
& unloading) 290 x 112 / 100 x 140 mm
7 TBSC-A.II-05 Fly ash cement / lime solid blocks with compressive strength of 75 kg/sq.cm -
IS:12894-1990 - CLASS - 7.5 (ex-quarry price - excluding cost of conveyance, loading
& unloading) 225 x 100 x 60 mm
8 TBSC-A.II-06 Fly ash cement / lime solid blocks with compressive strength of 75 kg/sq.cm -
IS:12894-1990 - CLASS - 7.5 (ex-quarry price - excluding cost of conveyance, loading
& unloading) 145 x 225 x 140 mm
9 TBSC-A.II-07 Fly ash cement / lime solid blocks with compressive strength of 75 kg/sq.cm -
IS:12894-1990 - CLASS - 7.5 (ex-quarry price - excluding cost of conveyance, loading
& unloading) 145 x 200 x 140 mm
10 TBSC-A.II-08 Fly ash cement / lime solid blocks with compressive strength of 50 kg/sq.cm -
IS:12894-1990 - CLASS - 5 (ex-quarry price - excluding cost of conveyance, loading &
unloading) 290 x 225 x 140 mm
11 TBSC-A.II-09 Fly ash cement / lime solid blocks with compressive strength of 50 kg/sq.cm -
IS:12894-1990 - CLASS - 5 (ex-quarry price - excluding cost of conveyance, loading &
unloading) 290 x 200 x 140 mm
12 TBSC-A.II-10 Fly ash cement / lime solid blocks with compressive strength of 50 kg/sq.cm -
IS:12894-1990 - CLASS - 5 (ex-quarry price - excluding cost of conveyance, loading &
unloading) 290 x 150 x 140 mm
13 TBSC-A.II-11 Fly ash cement / lime solid blocks with compressive strength of 50 kg/sq.cm -
IS:12894-1990 - CLASS - 5 (ex-quarry price - excluding cost of conveyance, loading &
unloading) 290 x 112/100 x 140 mm
14 TBSC-A.II-12 Fly ash cement / lime solid blocks with compressive strength of 50 kg/sq.cm -
IS:12894-1990 - CLASS - 5 (ex-quarry price - excluding cost of conveyance, loading &
unloading) 225 x 100 x 60 mm
15 TBSC-A.II-13 Fly ash cement / lime solid blocks with compressive strength of 50 kg/sq.cm -
IS:12894-1990 - CLASS - 5 (ex-quarry price - excluding cost of conveyance, loading &
unloading) 145 x 225 x 140 mm
16 TBSC-A.II-14 Fly ash cement / lime solid blocks with compressive strength of 50 kg/sq.cm -
IS:12894-1990 - CLASS - 5 (ex-quarry price - excluding cost of conveyance, loading &
unloading) 145 x 200 x 140 mm
III SUB-SECTION AUTOCLAVED CONCRETE BLOCKS
17 TBSC-A.III-01 Supply of Aerated (Cellular) Autoclaved Concrete Blocks conforming to IS:2185
(Part-3) - 1984 and IS:6441-1972 of Compressive strength 3 N/mm2 (landing cost of
conveyance, loading & unloading) of Aerocon / Airolite or equivalent products 600 x
200 x 100 mm
18 TBSC-A.III-02 Supply of Aerated (Cellular) Autoclaved Concrete Blocks conforming to IS:2185
(Part-3) - 1984 and IS:6441-1972 of Compressive strength 3 N/mm2 (landing cost of
conveyance, loading & unloading) of Aerocon / Airolite or equivalent products 600 x
200 x 150 mm
19 TBSC-A.III-03 Supply of Aerated (Cellular) Autoclaved Concrete Blocks conforming to IS:2185
(Part-3) - 1984 and IS:6441-1972 of Compressive strength 3 N/mm2 (landing cost of
conveyance, loading & unloading) of Aerocon / Airolite or equivalent products 600 x
200 x 200 mm
20 TBSC-A.III-04 Supply of Aerated (Cellular) Autoclaved Concrete Blocks conforming to IS:2185
(Part-3) - 1984 and IS:6441-1972 of Compressive strength 3 N/mm2 (landing cost of
conveyance, loading & unloading) of Aerocon / Airolite or equivalent products 600 x
200 x 230 mm

B SECTION NATURAL FLOORING STONES


(Ex-quarry price - excluding cost of conveyance, loading & unloading)
I SUB-SECTION LOCALLY AVAILABLE FLOORING STONES
21 TBSC-B.I-01 Shahabad / Tandur Rough Stone slabs of all sizes upto 25 mm in thickness
22 TBSC-B.I-02 Shahabad / Tandur Rough Stone slabs of all sizes between 25 - 40 mm thickness
23 TBSC-B.I-03 Polished Shahabad/ Tandur stone slabs of all sizes between 15 to 18 mm thickness

24 TBSC-B.I-04 Kadapa slabs of 40 mm thick of all sizes


25 TBSC-B.I-05 Kadapa slabs of 50 mm thick of all sizes
26 TBSC-B.I-06 Polished black Kadapa slabs of all sizes between 15 - 18 mm thickness
27 TBSC-B.I-07 Polished black Kadapa slabs of all sizes between 25 - 30 mm thickness
28 TBSC-B.I-08 Polished White Bethamcherla (marble type) stone of all sizes and between 22 - 25
mm thickness
29 TBSC-B.I-09 Polished Coloured Bethamcherla (marble type) stone of all sizes and between 22 - 25
mm thickness
II SUB-SECTION NATURAL FLOORING STONES - MARBLE
30 TBSC-B.II-01 Polished Marble slabs of Dongari/ Adanga/ Marodh/ Rajgangpur etc., variety of
thickness between 16 mm to 20 mm of sizes from 600mm to 900mm
31 TBSC-B.II-02 Polished Marble slabs of Dongari/ Adanga/ Marodh/ Rajgangpur etc., variety of
thickness between 16 mm to 20 mm of sizes upto 600mm
32 TBSC-B.II-03 Polished Marble slabs of any variety and gang saw cut (Dongari/ Adanga/ Marodh/
Rajgangpur etc.) 16 mm to 20 mm (average) thick (0.610 m width of any length)

33 TBSC-B.II-04 Polished Marble Tiles 8 - 10 mm thick of all sizes and varieties


III SUB-SECTION NATURAL FLOORING STONES - GRANITE
34 TBSC-B.III-01 High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black /
premium colours
35 TBSC-B.III-02 High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black and
regular colours
36 TBSC-B.III-03 High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) black
37 TBSC-B.III-04 Granite stone tiles 8 mm thick (mirror polished of all shades)

C SECTION WALL & FLOOR TILES


(Landing cost - including cost of conveyance, loading & unloading)
I SUB-SECTION NON-PORCELAIN CERAMIC FLOOR TILES
38 TBSC-C.I-01 Supply of Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and
thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS13630
(Parts 1 to 15) of anycolour and finish in all shades and designs
39 TBSC-C.I-02 Supply of Non-skid red or white full body Ceramic floor tiles of size 400 x 400 mm and
thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS13630
(Parts 1 to 15) of anycolour and finish in all shades and designs
40 TBSC-C.I-03 Supply of Non-skid red or white full body Ceramic floor tiles of size 600 x 600 mm and
thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS13630
(Parts 1 to 15) of anycolour and finish in all shades and designs
41 TBSC-C.I-04 Supply of Non-skid red or white full body Ceramic floor tiles of scratch free-stain free
and scratch free-nano finish of size 600 x 600 mm and thickness between 8-10 mm
1st quality conforming to IS:13711, IS:13712, IS13630 (Parts 1 to 15) of anycolour and
finish in all shades and designs
II SUB-SECTION PORCELAIN VITRIFIED FLOOR TILES
42 TBSC-C.II-01 Supply of ordinary soluble salt porcelain vitrified tiles screen printed and polised of
size 400 x 400 mm and thickness between 8-9 mm 1st quality conforming to IS:13711,
IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades and designs

43 TBSC-C.II-02 Supply of soluble salt porcelain vitrified tiles screen printed and polised of size 600 x
600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711,
IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades and designs

44 TBSC-C.II-03 Supply of Nano polished / stain free soluble salt porcelain vitrified tiles screen printed
and polised of size 600 x 600 mm and thickness between 8-10 mm 1st quality
conforming to IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in
all shades and designs
45 TBSC-C.II-04 Supply of Nano polished soluble salt porcelain vitrified tiles screen printed and polised
of size 800 x 800 mm and thickness between 9-11 mm 1st quality conforming to
IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades
and designs
46 TBSC-C.II-05 Supply of Double charged / multi charged stain free full body porcelain vitrified tiles
with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1st
quality conforming to IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and
finish in all shades and designs
47 TBSC-C.II-06 Supply of Double charged / multi charged stain free full body porcelain vitrified tiles
with double layer pigment of size 800 x 800 mm and thickness between 9-11 mm 1st
quality conforming to IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and
finish in all shades and designs
48 TBSC-C.II-07 Supply of Double charged / multi charged stain free full body porcelain vitrified tiles
with double layer pigment of size 1000 x 1000 mm and thickness between 12-15 mm
1st quality conforming to IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour
and finish in all shades and designs
49 TBSC-C.II-08 Supply of digital / polished glazed full body porcelain vitrified tiles with any type of
design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch
less, stain free and of size 800 x 800 mm and thickness between 9-11 mm 1st quality
conforming to IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in
all shades and designs
50 TBSC-C.II-09 Supply of digital / polished glazed full body porcelain vitrified tiles with any type of
design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch
less, stain free and of size 900 x 900 mm and thickness between 9-11 mm 1st quality
conforming to IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in
all shades and designs
51 TBSC-C.II-10 Supply of digital / polished glazed full body porcelain vitrified tiles with any type of
design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch
less, stain free and of size 1000 x 1000 mm and thickness between 12-15 mm 1st
quality conforming to IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and
finish in all shades and designs
52 TBSC-C.II-11 Supply of digital / polished glazed full body porcelain vitrified tiles with any type of
design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch
less, stain free and of size 1200 x 600 mm and thickness between 12-15 mm 1st
quality conforming to IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and
finish in all shades and designs
53 TBSC-C.II-12 Supply of full body heavy duty industrial variety porcelain vitrified tiles of size 300 x
300 / 200 x 100 mm and thickness between 10-12 mm 1st quality conforming to
IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades
and designs
54 TBSC-C.II-13 Supply of full body heavy duty industrial variety / tact porcelain vitrified tiles of size 300
x 300 / 200 x 100 mm and thickness between 12-15 mm 1st quality conforming to
IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades
and designs
55 TBSC-C.II-14 Supply of full body heavy duty industrial variety porcelain vitrified tiles of size 300 x
300 / 200 x 100 mm and thickness between 18-20 mm 1st quality conforming to
IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades
and designs
56 TBSC-C.II-15 Supply of full body heavy duty industrial variety porcelain vitrified tiles of size 400 x
400 mm and thickness between 10-12 mm 1st quality conforming to IS:13711,
IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades and designs

57 TBSC-C.II-16 Supply of full body heavy duty industrial variety porcelain vitrified tiles of size 600 x
600 mm and thickness between 10-12 mm 1st quality conforming to IS:13711,
IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades and designs

III SUB-SECTION CERAMIC WALL TILES


58 TBSC-C.III-01 Supply of glazed red or white full body ceramic wall tiles of size 200 x 300 / 245 x 325
mm and thickness between 6 mm 1st quality conforming to IS:13711, IS:13712, IS:
13630 (Parts 1 to 15) of any colour and finish in all shades and designs

59 TBSC-C.III-02 Supply of glazed red or white full body ceramic wall tiles of size 300 x 450 / 320 x 400
mm and thickness between 6 mm 1st quality conforming to IS:13711, IS:13712, IS:
13630 (Parts 1 to 15) of any colour and finish in all shades and designs

60 TBSC-C.III-03 Supply of glazed red or white full body ceramic wall tiles of size 300 x 600 mm and
thickness between 6-8 mm 1st quality conforming to IS:13711, IS:13712, IS: 13630
(Parts 1 to 15) of any colour and finish in all shades and designs
IV SUB-SECTION PORCELAIN WALL TILES
61 TBSC-C.IV-01 Supply of glazed full body porcelain wall tiles of size 300 x 600 mm with any type of
design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch
less, stain free and thickness between 6-8 mm 1st quality conforming to IS:13711,
IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades and designs

62 TBSC-C.IV-02 Supply of digital / polished glazed full body porcelain wall tiles of size 300 x 600 mm
with any type of design texture such as marble finish, wooden, bamboo, stone finishes
etc., scratch less, stain free and thickness between 6-8 mm 1st quality conforming to
IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades
and designs
63 TBSC-C.IV-03 Supply of digital / polished glazed full body porcelain highliter wall tiles of size 300 x
600 mm with any type of design texture such as marble finish, wooden, bamboo,
stone finishes etc., scratch less, stain free and thickness between 6-8 mm 1st quality
conforming to IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in
all shades and designs
64 TBSC-C.IV-04 Supply of screen printed glazed full body porcelain wall tiles of size 300 x 600 mm with
any type of design texture such as marble finish, wooden, bamboo, stone finishes etc.,
scratch less, stain free and thickness between 6-8 mm 1st quality conforming to
IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades
and designs
65 TBSC-C.IV-05 Supply of glazed full body porcelain wall tiles of size 400 x 600 mm with any type of
design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch
less, stain free and thickness between 6-8 mm 1st quality conforming to IS:13711,
IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades and designs

66 TBSC-C.IV-06 Supply of glazed full body porcelain wall tiles of size 600 x 800 mm with any type of
design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch
less, stain free and thickness between 7-9 mm 1st quality conforming to IS:13711,
IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades and designs

67 TBSC-C.IV-07 Supply of glazed full body porcelain premium plain design highliter combination floor
and wall tiles set with floor tiles of thickness 14-16 mm of thickness 8-10 mm but
excluding highlighters 1st quality conforming to IS:13711, IS:13712, IS: 13630 (Parts 1
to 15) of any colour and finish in all shades and designs
68 TBSC-C.IV-08 Supply of glazed full body porcelain premium plain design highliter combination floor
and wall tiles set with floor tiles of thickness 14-16 mm of thickness 8-10 mm but
including highlighters 1st quality conforming to IS:13711, IS:13712, IS: 13630 (Parts 1
to 15) of any colour and finish in all shades and designs
69 TBSC-C.IV-09 Providing and fixing wall dado with epoxy emulsion grout / synthetic / resin based
adhesive in specified thick and pointing with specified colour epoxy grout excluding
cost of tiles
70 TBSC-C.IV-10 Providing and fixing wall dado with cement based adhesive in specified thick and
pointing with specified colour epoxy grout excluding cost of tiles
71 TBSC-C.IV-11 Providing and fixing flooring with full depth jointing and pointing to the Vitrified/
Ceramic Tile flooring in specified thick for tiles of any sizes with epoxy emulsion grout/
synthetic/ resin adhesive in width of 3-5 mm with Nylon spacers excluding cost of tiles

72 TBSC-C.IV-12 Providing and fixing flooring with full depth jointing and pointing to the Vitrified/
Ceramic Tile flooring in specified thick for tiles of any sizes with cement based
adhesive in width of 3-5 mm with Nylon spacers excluding cost of tiles
73 TBSC-C.IV-13 Providing and fixing flooring with full depth jointing and pointing to the Marble / Granite
flooring for any sizes with epoxy emulsion grout/ synthetic/ resin adhesive in width of
3-5 mm excluding cost of tiles
74 TBSC-C.IV-14 Providing and fixing flooring with full depth jointing and pointing to the Marble / Granite
flooring for any sizes with cement based adhesive in width of 3-5 mm excluding cost of
tiles
V SUB-SECTION GLASS MOSAIC TILES
75 TBSC-C.V-01 Supply of glazed full body glass mosaic tiles of 20 x 20 x 4 mm thick in specified
pattern 1st Quality of any colour and design
76 TBSC-C.V-02 Providing Glass Mosaic tiles using specified pattern fixing in specified thick epoxy
emulsion grout of epoxy resins and filler powder of approved colour grout including all
taxes excluding cost of tiles
77 TBSC-C.V-03 Providing Glass Mosaic tiles using specified pattern fixing in specified thick
cementitious powder mix cement grout and approved colour grout including all taxes
excluding cost of tiles
VI SUB-SECTION WALL CLADDING TILES
78 TBSC-C.VI-01 Supply of glazed full body porcelain tiles for external cladding purposes of any size
and thickness between 6-10 mm 1st quality conforming to IS:13711, IS:13712, IS:
13630 (Parts 1 to 15) of any colour and finish in all shades and designs

79 TBSC-C.VI-02 Supply of glazed red or white full body ceramic tiles for external cladding purposes of
any size and thickness between 5-7 mm 1st quality conforming to IS:13711, IS:13712,
IS: 13630 (Parts 1 to 15) of any colour and finish in all shades and designs

80 TBSC-C.VI-03 Supply of glazed red or white full body ceramic tiles for external cladding purposes of
any size and thickness between 10-12 mm 1st quality conforming to IS:13711,
IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades and designs
81 TBSC-C.VI-04 Supply of glazed red or white full body ceramic tiles for external cladding purposes of
any size and thickness between 18-20 mm 1st quality conforming to IS:13711,
IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades and designs

VII SUB-SECTION TERRAZZO FLOOR TILES (PLAIN & CHEQUERED)


82 TBSC-C.VII-01 Supplying precast terrazzo tiles conforming to IS:13801 using marble aggregates of
size 10mm, sand, marble powder, white cement pigments etc., with terrazzo topping
not less than 6 mm of tiles overall size not less than 20 mm thick white shades.

83 TBSC-C.VII-02 Supplying precast terrazzo plain tiles conforming to IS:13801 using marble aggregates
of size 10mm, sand, marble powder, white cement pigments etc., with terrazzo topping
not less than 6 mm of tiles overall size not less than 20 mm thick any coloured
shades.
84 TBSC-C.VII-03 Supplying precast terrazzo chequered tiles conforming to IS:13801 using marble
aggregates of size 10mm, sand, marble powder, white cement pigments etc., with
terrazzo topping not less than 6 mm of tiles overall size not less than 20 mm thick any
coloured shades.
VIII SUB-SECTION CEMENT CONCRETE FLOOR TILES (PLAIN & CHEQURED)
85 TBSC-C.VIII-01 Supplying Plain Cement Concrete general purpose tiles conforming to IS: 13801 using
aggregates, cement, pigments of size 300 x 300 mm and thickness 20 mm of any
shades
86 TBSC-C.VIII-02 Supplying Chequered Cement Concrete general purpose tiles conforming to IS: 13801
using aggregates, cement, pigments of size 300 x 300 mm and thickness 20 mm of
any shades
87 TBSC-C.VIII-03 Supplying Plain Cement Concrete general purpose tiles conforming to IS: 13801 using
aggregates, cement, pigments of size 300 x 300 mm and thickness 25 mm of any
shades
88 TBSC-C.VIII-04 Supplying Chequered Cement Concrete general purpose tiles conforming to IS: 13801
using aggregates, cement, pigments of size 300 x 300 mm and thickness 25 mm of
any shades
89 TBSC-C.VIII-05 Supplying Plain Cement Concrete general purpose tiles conforming to IS: 13801 using
aggregates, cement, pigments of size 400 x 400 mm and thickness 25 mm of any
shades
90 TBSC-C.VIII-06 Supplying Chequered Cement Concrete general purpose tiles conforming to IS: 13801
using aggregates, cement, pigments of size 400 x 400 mm and thickness 25 mm of
any shades
91 TBSC-C.VIII-07 Supply of high strength Cement Concrete Plain Step tiles with edge half rounded and
grooved conforming to IS:13801 using aggregates, cement, pigments of regular
colour, design and of 25 mm thickness
92 TBSC-C.VIII-08 Supply of high strength Cement Concrete terrazzo/pre-polished/ chequered Step tiles
with edge rounded and grooved conforming to IS:13801 using aggregates, cement,
pigments of regular colour, design and of 25 mm thickness
IX SUB-SECTION PRE-CAST CONCRETE BLOCK FOR PAVING
93 TBSC-C.IX-01 Suppply of precast concrete blocks for paving of M-30 grade and thickness not less
than 50 mm for Non-traffic areas conforming to IS 15658:2006 in all shapes and
designs as per the manufacturer's Specification
94 TBSC-C.IX-02 Suppply of precast concrete blocks for paving of M-35 grade and thickness not less
than 60 mm for Light traffic areas conforming to IS 15658:2006 in all shapes and
designs as per the manufacturer's Specification
95 TBSC-C.IX-03 Suppply of precast concrete blocks for paving of M-40 grade and thickness not less
than 80 mm for Medium traffic areas conforming to IS 15658:2006 in all shapes and
designs as per the manufacturer's Specification
96 TBSC-C.IX-04 Suppply of precast concrete blocks for paving of M-50 grade and thickness not less
than 100 mm for Heavy traffic areas conforming to IS 15658:2006 in all shapes and
designs as per the manufacturer's Specification
97 TBSC-C.IX-05 Suppply of precast concrete blocks for paving of M-55 grade and thickness not less
than 120 mm for Very Heavy traffic areas conforming to IS 15658:2006 in all shapes
and designs as per the manufacturer's Specification
98 TBSC-C.IX-06 Labour Charges for laying & fixing of precast concrete blocks for paving of all grades,
any thickness, all sizes & shapes including all labour charges for loading & unloading,
laying to desired lines and levels complete excluding cost of cement, sand, water,
electricity etc
X SUB-SECTION VINYL FLOORING
99 TBSC-C.X-01 Vinyl Flooring Sheets/ Tiles having a nominal total thickness of 2 mm with a wearing
surface impregnated polyurethane homogeneous mixture of PVC, Plasticizers,
Urethane, colour pigments with wearing resistance and Fire Resistance as per
standards
100 TBSC-C.X-02 Vinyl Composition Floor Tiles of size 305 x 305 mm having an overall thickness of 2
mm with a wearing surface impregnated polyurethane homogeneous mixture of PVC,
Plasticizers, Urethane, colour pigments with wearing resistance and Fire Resistance
as per standards
101 TBSC-C.X-03 Vinyl Flooring Sheets/ Tiles having a nominal total thickness of 1.5 mm with a wearing
surface impregnated polyurethane homogeneous mixture of PVC, Plasticizers,
Urethane, colour pigments with wearing resistance and Fire Resistance as per
standards

D SECTION TIMBER & ROOFING MATERIALS


(Landing cost - including cost of conveyance, loading & unloading)
Note: Before proposing the Teak Wood Items, the estimating authorities shall
obtain prior approval from the competent authority
I SUB-SECTION MEDIUM TEAK WOOD
102 TBSC-D.I-01 Medium Teak Wood scantlings: up to 2.0 M
103 TBSC-D.I-02 Medium Teak Wood scantlings: 2.0 to 3.0 M
104 TBSC-D.I-03 Medium Teak Wood scantlings: above 3.0 M
105 TBSC-D.I-04 Medium Teak Wood Plancks: any thickness
II SUB-SECTION BEST TEAK WOOD
106 TBSC-D.II-01 Best Teak Wood scantlings: up to 2.0 M
107 TBSC-D.II-02 Best Teak Wood scantlings: 2.0 to 3.0 M
108 TBSC-D.II-03 Best Teak Wood scantlings: above 3.0 M
109 TBSC-D.II-04 Best Teak Wood Plancks: any thickness
III SUB-SECTION BURMA TEAK WOOD
110 TBSC-D.III-01 Burma Teak Wood scantlings: up to 2.0 M
111 TBSC-D.III-02 Burma Teak Wood scantlings: 2.0 to 3.0 M
112 TBSC-D.III-03 Burma Teak Wood scantlings: above 3.0 M
113 TBSC-D.III-04 Burma Teak Wood Plancks: any thickness
IV SUB-SECTION ASSAM TEAK WOOD
114 TBSC-D.IV-01 Assam Teak Wood scantlings: any length
115 TBSC-D.IV-02 Assam Teak Wood Plancks: any thickness
V SUB-SECTION SAL / COUNTRY WOOD
116 TBSC-D.V-01 Sal Wood scantlings: any length
117 TBSC-D.V-02 Sal Wood Plancks: any thickness
VI SUB-SECTION ROOFING MATERIAL
118 TBSC-D.VI-01 A.C sheet Corrugated 6 mm thick
119 TBSC-D.VI-02 A.C sheet plain 4 m thick
120 TBSC-D.VI-03 A.C sheet plain 6 m thick
121 TBSC-D.VI-04 Plain or Corrugated Galvanized iron sheets as per IS 277 (0.1 mm to 0.8 mm
thickness)
122 TBSC-D.VI-05 Supply of Pre-painted Galvalume Trapezoidal Profile Roofing sheets with
0.50mm thickness, Coating: Alu-Zinc coating AZ150 GSM. Tensile Strength: 550
MPA. Paint coating: Regular Modified Polyester painting. Painting Thickness (Top): 18
to 20 Microns, (Bottom): 5 to 7 Microns. Sheet Width: 1.020, Length: Maximum 12
Meters with Regular Range Colours
123 TBSC-D.VI-06 Supply of Pre-painted Galvalume Trapezoidal Profile Roofing sheets with
0.47mm thickness, Coating: Alu-Zinc coating AZ 150 GSM. Tensile Strength: 550
MPA. Paint coating: Regular Modified Polyester painting. Painting Thickness (Top): 18
to 20 Microns, (Bottom): 5 to 7 Microns. Sheet Width: 1.020, Length: Maximum 12
Meters with Regular Range Colours
124 TBSC-D.VI-07 Supply of Pre-painted Galvanized Trapezoidal Profile Roofing sheets with 0.50mm
thickness, Coating: Zinc coating Z120 GSM. Tensile Strength: 300 MPA. Paint coating:
Regular Modified Polyester painting. Painting Thickness (Top): 18 to 20 Microns,
(Bottom): 5 to 7 Microns. Sheet Width: 1.020, Length: Maximum 12 Meters with
Regular Range Colours
125 TBSC-D.VI-08 Supply of Pre-painted Galvanized Trapezoidal Profile Roofing sheets with 0.47mm
thickness, Coating: Zinc coating Z120 GSM. Tensile Strength: 300 MPA. Paint coating:
Regular Modified Polyester painting. Painting Thickness (Top): 18 to 20 Microns,
(Bottom): 5 to 7 Microns. Sheet Width: 1.020, Length: Maximum 12 Meters with
Regular Range Colours
126 TBSC-D.VI-09 Supply of Roof Accessories medium size: Ridge, Barge Cap, Corner Trim, L-Flashing,
Down Pipes, Gutter etc., with 0.50mm thick, Width: 0.585, Length: Maximum 2½
Meters
127 TBSC-D.VI-10 Supply of Roof Accessories medium size: Ridge, Barge Cap, Corner Trim, L-Flashing,
Down Pipes, Gutter etc., with 0.47mm thick, Width: 0.585, Length: Maximum 2½
Meters
TBSC-D.VI-11 Supply of fibre reinforced corrugated sheets 6mm thick(Non asbestos) in compliance
with Type-A Category –C class-7 of IS 14871 for roofing
TBSC-D.VI-12 Supply of pre painted fibre reinforced corrugated sheets 6mm thick(Non asbestos) in
compliance with Type-A Category –C class-7 of IS 14871 for roofing
128 TBSC-D.VI-11 Supply of UV resistant multi-wall polycarbonate sheets for roofing of any colour - 6 mm
thick
129 TBSC-D.VI-12 Aluminium universal glazing set 40mm wide for jointing and fixing polycarbonate
sheets
130 TBSC-D.VI-13 75 mm long screws -
131 TBSC-D.VI-14 G.I scam bolts & nuts
132 TBSC-D.VI-15 G.I bolts & nuts
133 TBSC-D.VI-16 G.I ‘J’ bolts 8 mm dia
134 TBSC-D.VI-17 G.I Washers
135 TBSC-D.VI-18 Limpet washers (for scam & ‘J’ bolts)
136 TBSC-D.VI-19 Bitumen washers

E SECTION STEEL MATERIALS


(Landing cost - including cost of conveyance, loading & unloading)
I SUB-SECTION MILD STEEL MATERIAL
137 TBSC-E.I.01 Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths,
interlocked together through their entire length and jointed together at the ends by
end-locks, mounted on specially designed pipe shaft of 50mm dia nominal bore MS B
class pipe with brackets, plates, guide channels, stoppers, bottom locking plates
and arrangements for inside & outside locking with push-pull operations including cost
of hood cover and springs complete, painted with one coat of approved steel primer,
locks, ball bearings, all accessories etc complete for finished item of work as per
special spn: 1108

138 TBSC-E.I.02 Supplying & fixing collapsible steel shutters with vertical, double channel of 20 x10x2
mm of 100 mm centre ,Bracers with flat iron 40x40x6 mm with 38 mm dia steel
pulleys, the top, bottom and side vertical frames of the collapsible gate with
65x65mmx8mm MS Angle and middle guide rail at site height with 65mmx8mm MS
flat for the pulleys to guide and fixed with necessary hold fasts, bolts, nuts, rivets,
locking arrangements, stoppers, handles, all accessories all fixtures and painted
with one coat of approved steel primer etc., complete for finished item of work as
per special spn 1105
139 TBSC-E.I.03 Expanded metal sheets as per IS-412-1962- Light Weight-25 mm (SWM) x 75 mm
(LWM) 3.25 mm Wide and 1.25 mm thick
140 TBSC-E.I.04 Expanded metal sheets as per IS-412-1962- Light Weight-20 mm(SWM)x60
mm(LWM) 2.50 mm Wide and 1.25 mm thick
141 TBSC-E.I.05 Expanded metal sheets as per IS-412-1962- Light Weight-20 mm(SWM)x50
mm(LWM) 2.50 mm Wide and 1.25 mm thick
142 TBSC-E.I.06 Expanded metal sheets as per IS-412-1962- Medium Weight-25 mm(SWM)x75
mm(LWM) 3.25 mm Wide and 1.60 mm thick
143 TBSC-E.I.07 Expanded metal sheets as per IS-412-1962- Medium Weight-20 mm(SWM)x60
mm(LWM) 2.50 mm Wide and 1.60 mm thick
144 TBSC-E.I.08 Expanded metal sheets as per IS-412-1962- Medium Weight-20 mm(SWM)x50
mm(LWM) 2.50 mm Wide and 1.60 mm thick
145 TBSC-E.I.09 Expanded metal sheets as per IS-412-1962- Heavy Weight-25 mm(SWM)x75
mm(LWM) 3.25 mm Wide and 2.24 mm thick
146 TBSC-E.I.10 Expanded metal sheets as per IS-412-1962- Heavy Weight-20 mm(SWM)x60
mm(LWM) 2.50 mm Wide and 2.24 mm thick
147 TBSC-E.I.11 Expanded metal sheets as per IS-412-1962- Heavy Weight-20 mm(SWM)x50
mm(LWM) 2.50 mm Wide and 2.24 mm thick
148 TBSC-E.I.12 Rabbit wire mesh (chicken mesh) of not less than 30 gauge
149 TBSC-E.I.13 Country Nails
150 TBSC-E.I.14 Wire Nails
151 TBSC-E.I.15 Mild Steel Tubes & pipes of all diameters as per IS-1161
II SUB-SECTION GALVANIZED STEEL MATERIAL
152 TBSC-E.II.01 Supplying Galvanized Steel Barbed wire conforming to IS 278 - 1978 : Type A - IOWA
Type Designation as per standard specification
153 TBSC-E.II.02 Supplying Galvanized Steel Barbed wire conforming to IS 278 - 1978 : Type B - IOWA
Type Designation as per standard specification
154 TBSC-E.II.03 Galvanized Iron fly proof wire mesh of not less than 20 gauge
155 TBSC-E.II.04 Hot dipped Galvanised Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-
1979: 2"x2" (50 mm x 50 mm) - 8 Gauge
156 TBSC-E.II.05 Hot dipped Galvanised Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-
1979: 2½"x2½" (63 mm x 63 mm) - 8 Gauge
157 TBSC-E.II.06 Hot dipped Galvanised Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-
1979: 3"x3" (76 mm x 76 mm) - 8 Gauge
158 TBSC-E.II.07 Hot dipped Galvanised Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-
1979: 4"x4" (102 mm x 102 mm) - 8 Gauge
159 TBSC-E.II.08 Hot dipped Galvanised Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979
- PVC Coated - 2"x2" (50 mm x 50 mm) - 8 Gauge
160 TBSC-E.II.09 Hot dipped Galvanised Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979
- PVC Coated - 2½"x2½" (63 mm x 63 mm) - 8 Gauge
161 TBSC-E.II.10 Hot dipped Galvanised Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979
- PVC Coated - 3"x3" (76 mm x 76 mm) - 8 Gauge
162 TBSC-E.II.11 Hot dipped Galvanised Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979
- PVC Coated - 4"x4" (102 mm x 102 mm) - 8 Gauge
III SUB-SECTION STAINLESS STEEL MATERIAL
163 TBSC-E.III.01 Stainless Steel Tubes, sections, plates, sheets & pipes of all sizes & diameters for -
304 Grade
164 TBSC-E.III.02 Stainless steel fly proof wire mesh of not less than 20 gauge

F SECTION GLASS MATERIALS


(Landing cost - including cost of conveyance, loading & unloading)
I SUB-SECTION PLAIN GLASS PANES
165 TBSC-F.I.01 Plain Float Glass 4 mm thick
166 TBSC-F.I.02 Plain Float Glass 5 mm thick
167 TBSC-F.I.03 Plain Float Glass 6 mm thick
168 TBSC-F.I.04 Plain Float Glass 8 mm thick
169 TBSC-F.I.05 Plain Float Glass 10 mm thick
170 TBSC-F.I.06 Plain Float Glass 12 mm thick
II SUB-SECTION PIN HEADED GLASS PANES
171 TBSC-F.II.01 Pin headed Glass 4 mm thick
172 TBSC-F.II.02 Pin headed Glass 5 mm thick
III SUB-SECTION TINTED GLASS PANES
173 TBSC-F.III.01 Tinted - Bronze/ Green Glass 4 mm thick
174 TBSC-F.III.02 Tinted - Bronze/ Green Glass 5 mm thick
175 TBSC-F.III.03 Tinted - Bronze/ Green Glass 6 mm thick
176 TBSC-F.III.04 Tinted - Bronze/ Green Glass 8 mm thick
177 TBSC-F.III.05 Tinted - Bronze/ Green Glass 10 mm thick
178 TBSC-F.III.06 Tinted - Bronze/ Green Glass 12 mm thick
IV SUB-SECTION FROSTED / GROUND GLASS PANES
179 TBSC-F.IV.01 Frosted / Ground Glass 4 mm thick
180 TBSC-F.IV.02 Frosted / Ground Glass 5 mm thick
V SUB-SECTION TOUGHENED GLASS PANES
181 TBSC-F.V.01 Toughened Plain Glass 5 mm (including Glass)
182 TBSC-F.V.02 Toughened Plain Glass 6 mm (including Glass)
183 TBSC-F.V.03 Toughened Plain Glass 8 mm (including Glass)
184 TBSC-F.V.04 Toughened Plain Glass 10 mm (including Glass)
185 TBSC-F.V.05 Toughened Plain Glass 12 mm (including Glass)

G SECTION PAINTS & POLISHES


(Landing cost - including cost of conveyance, loading & unloading)
I SUB-SECTION PRIMERS, FILLERS & BASES
186 TBSC-G.I.01 Supply of water based Cement Primer of Interior Grade- 1
187 TBSC-G.I.02 Supply of water based Cement Primer of Exterior Grade- 2
188 TBSC-G.I.03 Supply of wall putty of White Cement or Polymer or Cement based
189 TBSC-G.I.04 Acrylic spray plaster in paste form made with specially selected inert mineral fillers,
antifungal agnts to protect the material the acrylicbinding medium used gives good
surface adhesion any grade
190 TBSC-G.I.05 Supply of Red Oxide Primer Paint for iron works of Grade -1
191 TBSC-G.I.06 Supply of Zinc Chromate Yellow Oxide Primer paint for iron works
192 TBSC-G.I.07 Supply of Wood Primer
193 TBSC-G.I.08 Supply of Metal paste (Putty) for steel works
194 TBSC-G.I.09 Supply of Putty for wood work (Powdered Chalk)
195 TBSC-G.I.10 Supply of White Lead
196 TBSC-G.I.11 Supply of Synthetic clear Varnish
197 TBSC-G.I.12 Supply of Spirit
198 TBSC-G.I.13 Supply of Linseed Oil
199 TBSC-G.I.14 Supply of thinner for melamine polish/ french polish
200 TBSC-G.I.15 Supply of thinner for Poly-urethene polish
201 TBSC-G.I.16 Supply of French Polish
202 TBSC-G.I.17 Supply of ready made Wax Polish
203 TBSC-G.I.18 Supply of wood adhesive compound
204 TBSC-G.I.19 Supply of anti-corrosive grade - 1 bitumen paint of black colour
II SUB-SECTION LIME, DISTEMPERS & CEMENT PAINTS
205 TBSC-G.II.01 Supply of paint grade white lime for wash
206 TBSC-G.II.02 Supply of Dry Powder Distemper
207 TBSC-G.II.03 Supply of acrylic based Oil Bound washable Distemper
208 TBSC-G.II.04 Supply of Water proof Cement paint
III SUB-SECTION EMULSION BASED PAINTS
209 TBSC-G.III.01 Supply of acrylic emulsion paint interior grade having VOC (Volatile Organic
Compound) content less than 50 gms / liter
210 TBSC-G.III.02 Supply of acrylic emulsion paint exterior grade with silicon additives having VOC
(Volatile Organic Compound) content less than 50 gms / liter
211 TBSC-G.III.03 Supply of acrylic emulsion paint weather proof water-based, modified acrylic with
silicon additives exterior grade having VOC (Volatile Organic Compound) content less
than 50 gms / liter
IV SUB-SECTION SOLVENT BASED PAINTS
212 TBSC-G.IV.01 Supply of solvent based latex paint having VOC (Volatile Organic Compound) content
less than 50 gms / liter
213 TBSC-G.IV.02 Supply of synthetic polymer luxury plastic emulsion / solvent based luster paint of
superior grade having VOC (Volatile Organic Compound) content less than 50 gms /
liter
V SUB-SECTION OIL BASED ENAMEL PAINTS
214 TBSC-G.V.01 Supply of ready mixed Synthetic Enamel paints in all shades Grade - I having VOC
(Volatile Organic Compound) content less than 50 gms / liter
215 TBSC-G.V.02 Supply of ready mixed Synthetic Enamel paints in all shades Grade - II having VOC
(Volatile Organic Compound) content less than 50 gms / liter
VI SUB-SECTION TEXTURE PAINTS
216 TBSC-G.VI.01 Exterior grade texture ready mixed plaster made with sand texture added sand
particles Acrylic copolymersand mineral compounds, bactericides and various
additives
217 TBSC-G.VI.02 Exterior grade texture ready mixed plaster made with natural minerals - granite flakes/
marble flakes/ powder, sand and other carefully selected and sieved minerals in ana
acrylic binding medium
VII SUB-SECTION SPECIAL PAINTS
218 TBSC-G.VII.01 Supply of Melamine Polish
219 TBSC-G.VII.02 Supply of Interior Grade Poly-Urethene Polish
220 TBSC-G.VII.03 Supply of Exterior Grade Poly-Urethene Polish
221 TBSC-G.VII.04 Supply of grade-1 aluminium paint
H SECTION PARTICLE BOARDS
(Landing cost - including cost of conveyance, loading & unloading)
I SUB-SECTION MELAMINE FACED PLAIN PARTICLE BOARDS
222 TBSC-H.I.01 Melamine faced Single Deco PPB- 8 mm thick
223 TBSC-H.I.02 Melamine faced Single Deco PPB- 12 mm thick
224 TBSC-H.I.03 Melamine faced Single Deco PPB- 18 mm thick
225 TBSC-H.I.04 Melamine faced Single Deco PPB- 25 mm thick
226 TBSC-H.I.05 Melamine faced Single Deco PPB- 35 mm thick
227 TBSC-H.I.06 Melamine faced Twin Deco PPB- 8 mm thick
228 TBSC-H.I.07 Melamine faced Twin Deco PPB- 12 mm thick
229 TBSC-H.I.08 Melamine faced Twin Deco PPB-18 mm thick
230 TBSC-H.I.09 Melamine faced Twin Deco PPB-25 mm thick
231 TBSC-H.I.10 Melamine faced Twin Deco PPB-35 mm thick
II SUB-SECTION INSULATING PARTICLE BOARDS
232 TBSC-H.II.01 Natural Colour-Insulating Board - 12 mm thick
233 TBSC-H.II.02 Natural Colour-Insulating Board - 18 mm thick
234 TBSC-H.II.03 Natural Colour-Insulating Board - 25 mm thick
235 TBSC-H.II.04 White Insulating Board - 12 mm thick
236 TBSC-H.II.05 White Insulating Board - 18 mm thick
237 TBSC-H.II.06 White Insulating Board - 25 mm thick
III SUB-SECTION MEDIUM DENSITY FIBRE BOARDS
238 TBSC-H.III.01 Medium Fibre Board: Interior Grade - 6 mm thick
239 TBSC-H.III.02 Medium Fibre Board: Interior Grade - 8 mm thick
240 TBSC-H.III.03 Medium Fibre Board: Interior Grade - 12 mm thick
241 TBSC-H.III.04 Medium Fibre Board: Interior Grade - 15 mm thick
242 TBSC-H.III.05 Medium Fibre Board: Interior Grade - 18 mm thick
243 TBSC-H.III.06 Medium Fibre Board: Interior Grade - 25 mm thick
244 TBSC-H.III.07 Medium Fibre Board: Interior Grade - 30 mm thick
245 TBSC-H.III.08 Medium Fibre Board: Interior Grade - 35 mm thick
246 TBSC-H.III.09 Medium Fibre Board: Exterior Grade - 6 mm thick
247 TBSC-H.III.10 Medium Fibre Board: Exterior Grade - 8 mm thick
248 TBSC-H.III.11 Medium Fibre Board: Exterior Grade - 12 mm thick
249 TBSC-H.III.12 Medium Fibre Board: Exterior Grade - 15 mm thick
250 TBSC-H.III.13 Medium Fibre Board: Exterior Grade - 18 mm thick
251 TBSC-H.III.14 Medium Fibre Board: Exterior Grade - 25 mm thick
252 TBSC-H.III.15 Medium Fibre Board: Exterior Grade - 30 mm thick
253 TBSC-H.III.16 Medium Fibre Board: Exterior Grade - 35 mm thick
254 TBSC-H.III.17 MDF Board: Plain-Interior - 9 mm thick
255 TBSC-H.III.18 MDF Board: Plain-Interior - 12 mm thick
256 TBSC-H.III.19 MDF Board: Plain-Interior - 18 mm thick
257 TBSC-H.III.20 MDF Board: Plain-Interior - 25 mm thick
258 TBSC-H.III.21 MDF Board: Plain-Interior - 30 mm thick
259 TBSC-H.III.22 MDF Board: Plain-Interior - 35 mm thick
260 TBSC-H.III.23 MDF Board: Plain-Exterior - 9 mm thick
261 TBSC-H.III.24 MDF Board: Plain-Exterior - 12 mm thick
262 TBSC-H.III.25 MDF Board: Plain-Exterior - 18 mm thick
263 TBSC-H.III.26 MDF Board: Plain-Exterior - 25 mm thick
264 TBSC-H.III.27 MDF Board: Plain-Exterior - 30 mm thick
265 TBSC-H.III.28 MDF Board: Plain-Exterior - 35 mm thick
266 TBSC-H.III.29 MDF Board: Interior-One Side Laminated -9 mm thick
267 TBSC-H.III.30 MDF Board: Interior-One Side Laminated -12 mm thick
268 TBSC-H.III.31 MDF Board: Interior-One Side Laminated -18 mm thick
269 TBSC-H.III.32 MDF Board: Interior-One Side Laminated -25 mm thick
270 TBSC-H.III.33 MDF Board: Interior-One Side Laminated -30 mm thick
271 TBSC-H.III.34 MDF Board: Interior-One Side Laminated -35 mm thick
272 TBSC-H.III.35 MDF Board: Exterior-One Side Laminated -9 mm thick
273 TBSC-H.III.36 MDF Board: Exterior-One Side Laminated -12 mm thick
274 TBSC-H.III.37 MDF Board: Exterior-One Side Laminated -18 mm thick
275 TBSC-H.III.38 MDF Board: Exterior-One Side Laminated -25 mm thick
276 TBSC-H.III.39 MDF Board: Exterior-One Side Laminated -30 mm thick
277 TBSC-H.III.40 MDF Board: Exterior-One Side Laminated -35 mm thick
278 TBSC-H.III.41 MDF Board: Interior-Both Side Laminated -9 mm thick
279 TBSC-H.III.42 MDF Board: Interior-Both Side Laminated -12 mm thick
280 TBSC-H.III.43 MDF Board: Interior-Both Side Laminated -18 mm thick
281 TBSC-H.III.44 MDF Board: Interior-Both Side Laminated -25 mm thick
282 TBSC-H.III.45 MDF Board: Interior-Both Side Laminated -30 mm thick
283 TBSC-H.III.46 MDF Board: Interior-Both Side Laminated -35 mm thick
284 TBSC-H.III.47 MDF Board: Exterior-Both Side Laminated -9 mm thick
285 TBSC-H.III.48 MDF Board: Exterior-Both Side Laminated -12 mm thick
286 TBSC-H.III.49 MDF Board: Exterior-Both Side Laminated -18 mm thick
287 TBSC-H.III.50 MDF Board: Exterior-Both Side Laminated -25 mm thick
288 TBSC-H.III.51 MDF Board: Exterior-Both Side Laminated -30 mm thick
289 TBSC-H.III.52 MDF Board: Exterior-Both Side Laminated -35 mm thick
IV SUB-SECTION CEMENT BONDED PLAIN & PARTICLE BOARDS
290 TBSC-H.IV.01 Cement Bonded Board conforming to IS:14862-2000 - 4 mm Thick
291 TBSC-H.IV.02 Cement Bonded Board conforming to IS:14862-2000 - 6 mm Thick
292 TBSC-H.IV.03 Cement Bonded Board conforming to IS:14862-2000 - 8 mm Thick
293 TBSC-H.IV.04 Cement Bonded Board conforming to IS:14862-2000 - 10 mm Thick
294 TBSC-H.IV.05 Cement Bonded Board conforming to IS:14862-2000 - 12 mm Thick
295 TBSC-H.IV.06 Cement Bonded Board conforming to IS:14862-2000 - 14 mm Thick
296 TBSC-H.IV.07 Cement Bonded Board conforming to IS:14862-2000 - 16 mm Thick
297 TBSC-H.IV.08 Cement Bonded Board conforming to IS:14862-2000 - 18 mm Thick
298 TBSC-H.IV.09 Cement Bonded Board conforming to IS:14862-2000 - 20 mm Thick
299 TBSC-H.IV.10 Cement Bonded Particle Board conforming to IS:14862 - 6 mm Thick
300 TBSC-H.IV.11 Cement Bonded Particle Board conforming to IS:14862 - 8 mm Thick
301 TBSC-H.IV.12 Cement Bonded Particle Board conforming to IS:14862 - 10 mm Thick
302 TBSC-H.IV.13 Cement Bonded Particle Board conforming to IS:14862 - 12 mm Thick
303 TBSC-H.IV.14 Cement Bonded Particle Board conforming to IS:14862 - 16 mm Thick
304 TBSC-H.IV.15 Cement Bonded Particle Board conforming to IS:14862 - 20 mm Thick
305 TBSC-H.IV.16 Cement Bonded Particle Board conforming to IS:14862 - 25 mm Thick
306 TBSC-H.IV.17 Cement Bonded Particle Board conforming to IS:14862 - 30 mm Thick
307 TBSC-H.IV.18 Cement Bonded Particle Board conforming to IS:14862 - 40 mm Thick
308 TBSC-H.IV.19 Pre-Laminated Cement Bonded Particle Board - 6 mm Thick
309 TBSC-H.IV.20 Pre-Laminated Cement Bonded Particle Board - 8 mm Thick
310 TBSC-H.IV.21 Pre-Laminated Cement Bonded Particle Board - 10 mm Thick
311 TBSC-H.IV.22 Pre-Laminated Cement Bonded Particle Board - 12 mm Thick
312 TBSC-H.IV.23 Pre-Laminated Cement Bonded Particle Board - 16 mm Thick
313 TBSC-H.IV.24 75 mm thick SOLID WALL PANEL Sandwich panels made of light weight FRACC non-
asbestos fibre reinforced cement concrete
314 TBSC-H.IV.25 75 mm thick SOLID WALL PANEL Sandwich panels made of light weight FRACC non-
asbestos fibre reinforced cement concrete
J SECTION PLYWOOD, LAMINATES & VENERS
(Landing cost - including cost of conveyance, loading & unloading)
I SUB-SECTION MOISTURE RESISTANT (MR) GRADE
315 TBSC-J.I.01 3 Ply - 4 mm thick Plywood conforming to (IS:303) MR Grade
316 TBSC-J.I.02 5 Ply - 6 mm thick Plywood conforming to (IS:303) MR Grade
317 TBSC-J.I.03 5 Ply - 8 mm thick Plywood conforming to (IS:303) MR Grade
318 TBSC-J.I.04 5 Ply - 9 mm thick Plywood conforming to (IS:303) MR Grade
319 TBSC-J.I.05 9 Ply - 12 mm thick Plywood conforming to (IS:303) MR Grade
320 TBSC-J.I.06 9 Ply - 15 mm thick Plywood conforming to (IS:303) MR Grade
321 TBSC-J.I.07 9 Ply - 18 mm thick Plywood conforming to (IS:303) MR Grade
II SUB-SECTION BOILING WATER RESISTANT (BWR) GRADE
322 TBSC-J.II.01 3 Ply - 4 mm thick Plywood conforming to (IS:303) BWR/BWP Grade
323 TBSC-J.II.02 5 Ply - 6 mm thick Plywood conforming to (IS:303) BWR/BWP Grade
324 TBSC-J.II.03 5 Ply - 8 mm thick Plywood conforming to (IS:303) BWR/BWP Grade
325 TBSC-J.II.04 5 Ply - 9 mm thick Plywood conforming to (IS:303) BWR/BWP Grade
326 TBSC-J.II.05 9 Ply - 12 mm thick Plywood conforming to (IS:303) BWR/BWP Grade
327 TBSC-J.II.06 9 Ply - 15 mm thick Plywood conforming to (IS:303) BWR/BWP Grade
328 TBSC-J.II.07 9 Ply - 19 mm thick Plywood conforming to (IS:303) BWR/BWP Grade
III SUB-SECTION VENEERED DECORATIVE PLYWOOD
329 TBSC-J.III.01 3 Ply - 4 mm thick One side Teak Veneer Decorated Plywood conforming to (IS:1328)

330 TBSC-J.III.02 5 Ply - 6 mm thick One side Teak Veneer Decorated Plywood conforming to (IS:1328)

331 TBSC-J.III.03 5 Ply - 9 mm thick One side Teak Veneer Decorated Plywood conforming to (IS:1328)

332 TBSC-J.III.04 9 Ply - 13 mm thick One side Teak Veneer Decorated Plywood conforming to (IS:1328)

333 TBSC-J.III.05 5 Ply - 9 mm thick Both sides Teak Veneer Decorated Plywood conforming to
(IS:1328)
334 TBSC-J.III.06 9 Ply - 12 mm thick Both sides Teak Veneer Decorated Plywood conforming to
(IS:1328)
IV SUB-SECTION LAMINATES
335 TBSC-J.IV.01 Melamine Laminate Sheets - Glossy Finish: 1.00 mm thick
336 TBSC-J.IV.02 Melamine Laminate Sheets - Glossy Finish: 1.50 mm thick
337 TBSC-J.IV.03 Melamine Laminate Sheets - Glossy Finish: 1.80 mm thick
338 TBSC-J.IV.04 Melamine Laminate Sheets - Mat Finish: 1.00 mm thick
339 TBSC-J.IV.05 Melamine Laminate Sheets - Mat Finish: 1.50 mm thick
340 TBSC-J.IV.06 Melamine Laminate Sheets - Mat Finish: 1.80 mm thick
V SUB-SECTION COMMERCIAL VENNERS
341 TBSC-J.V.01 Teak Veneer Lamination - 4 mm thick - Pencil Grains
342 TBSC-J.V.02 Teak Veneer Lamination - 4 mm thick - Natural Grains
K CEILINGS, WALL PARTITIONS & WALL LININGS
(Landing cost - including cost of conveyance, loading & unloading)
I SUB-SECTION FALSE CEILINGs - TILES / SHEETS
343 TBSC-K.I.01 Gypsum Board tiles of size notless than 0.595 M x 0.595 M of 12.5 mm thick as per IS
2095 -1992
344 TBSC-K.I.02 Gypsum Board tiles of size notless than 0.595 M x 0.595 M of 9 mm thick as per IS
2095 -1992
345 TBSC-K.I.03 Gypsum Board Plain sheet 12.5 mm thick as per IS 2095 -1993
346 TBSC-K.I.05 14 mm - Armstrong Mineral Fiber sheet 600 x 600 of beauty-Sky (Board / Tegular)
Edge tiles with a Humidity Resistance of 80% RH, Average NRC 0.50, Light
Reflectance >80%, Thermal Conductivity λ = 0.052 to 0.057 w/mk, Fire Performance
Class 0/Class 1
347 TBSC-K.I.06 15 mm - Armstrong Mineral Fiber sheet 600 x 600 of fissured-ANF (Board / Tegular)
Edge tiles with a Humidity Resistance of 90% RH, Average NRC 0.50, Light
Reflectance >80%, Thermal Conductivity λ = 0.052 to 0.057 w/mk, Fire Performance
Class 0/Class 1
348 TBSC-K.I.07 16 mm - Armstrong Tegular Edge 600 x 600 of MINATUFF (Board / Tegular/ Micro
look) Edge tiles with a Humidity Resistance of 99% RH, Average NRC 0.60, Light
Reflectance >88%, Thermal Conductivity λ = 0.052 to 0.057 w/mk, Fire
Performance Class 0/Class 1
349 TBSC-K.I.08 Designer ceiling Cement Boards -thickness 3.2 mm
350 TBSC-K.I.09 High pressure steam cured Cement Boards 4 mm thick
351 TBSC-K.I.10 High pressure steam cured Cement Boards 6 mm thick
352 TBSC-K.I.11 High pressure steam cured Cement Boards 8 mm thick
353 TBSC-K.I.12 High pressure steam cured Cement Boards 10 mm thick
354 TBSC-K.I.13 High pressure steam cured Cement Boards 12 mm thick
355 TBSC-K.I.14 High pressure steam cured Cement Boards 14 mm thick
356 TBSC-K.I.15 High pressure steam cured Cement Boards 16 mm thick
357 TBSC-K.I.16 High pressure steam cured Cement Boards 18 mm thick
358 TBSC-K.I.17 High pressure steam cured Cement Boards 20 mm thick
359 TBSC-K.I.18 High pressure steam cured designer Cement Boards 4 mm thick
360 TBSC-K.I.19 High pressure steam cured designer Cement Boards 6 mm thick
361 TBSC-K.I.20 Calcium Silicate Boards - 6mm thick
362 TBSC-K.I.21 Calcium Silicate Boards - 8mm thick
363 TBSC-K.I.22 Calcium Silicate Boards - 10mm thick
364 TBSC-K.I.23 Calcium Silicate Boards - 12mm thick
365 TBSC-K.I.24 Supply of Thermocole 12 mm thick sheets
366 TBSC-K.I.25 Supply of Thermocole 19 mm thick sheets
367 TBSC-K.I.26 Supplying and fixing of false ceiling using Plaster of paris Boards 12 mm thick with
standard GI ceiling angles, sections perimeter channels including cost and
conveyance of all materials and labour
368 TBSC-K.I.27 Supplying and fixing of false ceiling using Plaster of paris Boards 10 mm thick with
standard GI ceiling angles, sections perimeter channels including cost and
conveyance of all materials and labour charges etc complete
369 TBSC-K.I.28 Supply and fixing false ceiling using 8mm with thick Cement Bonded particle boards
conforming to (IS 14276) with galvanized and pre-painted steel T section of size
24mm x 38mm x 0.3mm for main T duty pre-punched to accept cross T section
of size 24mm x 30mm x 0.3mm duly punched at both ends for insertion into main
T. The grid size will be 610mm x 610mm. The frame work (grid) is suspended to the
roof by using G.I flat of 0.60mm or 14-gauge G.I wire with necessary fixers to the
roof and frame work. The cost is inclusive of necessary hardware, labor, one coat of
primer (Both side) and two coats of smooth finish on visible side.
370 TBSC-K.I.29 Providing and fixing false ceiling consisting of 600mmX600mm, Solid PVC insulation
panels having wall thickness of 1mm thick plain PVC rigid foam sheet and EPS as
defined in of desired thickness depending on insulation required shall be insert in a
frame work made using anodized aluminium Tee section of sizes 1”X1” (25X25mm, 19
gauge or 1mm thick) in square pattern of grid sizes of 2’X2’ (600X600mm). The
aluminium framework is supported from the ceiling with the help of G.I. hook and G.I.
wire/6mm.M.S. rods of required sizes to maintain proper level etc. the aluminium
framework is supported on side wall with the use of aluminium 1”X1” (25X25mm)
angles, complete as per direction of Engineer-in-Charge & drawing

371 TBSC-K.I.30 Supply and fixing of PVC false ceiling on MS/GI made skeleton framework. The frame
shall be 24 X 48mm MS tube section fixed along with the wall. The entire frame work
shall be concealed with PVC section having overall dimensions of 6 X 250mm with a
wall thickness of 1mm ± 0.3mm with tongue and groove system, provided with
necessary arrangements for electrical connections, complete, for finished item of work.

373 15 mm - Micro Look Edge 600 x 600 of Board / Tegular/ Micro look Edge
tiles with a Humidity Resistance of 95% RH, Average NRC 0.90, Light
Reflectance >88%, Thermal Conductivity λ = 0.032 w/mk, Fire Performance
Class 0/Class 1suitable for Green Building application, with Recycled content of
88% (FG)

374 16 mm - Tegular Edge 600 x 600 of Board / Tegular/ Micro look Edge tiles with a
Humidity Resistance of 99% RH, Average NRC 0.55, Light Reflectance >84%,
Thermal Conductivity λ = 0.052 to 0.057 w/mk, Fire Performance Class 0/Class 1

375 Providing & Fixing of Lay-in-metal plain ceiling System consisting of 600 x
600mm Lay in GI tiles of pre coated galvanised steel in 0.5 mm thickness in
white colour to be laid on grid systems with 15mm
376 Providing & Fixing of GI Lay in Standard Perforated (2.5mm diameter-16%
open area) metal ceiling consisting of 600 x 600 mm Lay in tiles of pre coated
galvanized steel in 0.5 mm thickness in Global white color acoustical fleece hot
pressed to the back of the perforated tile to be laid on grid systems with 0.5 mm
thickness in white colour with 15mm wide T - section flanges but excluding cost
of Grid systems and having rotary stitching on the Main Runner, 1200 mm
& 600 mm Cross Tees and the tiles with NRC of 0.70, Fire Performance of
Class A2-s1.d0 as per EN13501 standard in module size of 600 X 600 mm
suitable for Green Building application, with Recycled content of 25%
complete for finished item of work

372 SUB-SECTION FALSE CEILINGs - SECTIONS & ACCESSORIES


373 TBSC-K.II.01 G.I. Ceiling Angle - 25 mm x 10 mm x 0.55 mm
374 TBSC-K.II.02 G.I. Ceiling Section 51.5 mm x 26 mm x 10.5 mm x 0.55 mm thick
375 TBSC-K.II.03 G.I. Intermediate Section 45 mm x 15 mm x 15 mm x 0.9 mm
376 TBSC-K.II.04 G.I. Perimeter Channel - 20 mm x 27 mm x 30 mm (web) of 0.55 mm thick
377 TBSC-K.II.05 G.I.-Precoated Fine line Grid 25 mm x 25 mm x 0.7 mm
378 TBSC-K.II.06 G.I.-Precoated Fine line Grid 15 mm x 25 mm x 0.7 mm
379 TBSC-K.II.07 GI - Precoated - T-Sec- 24 mm x 38 mm x 0.7 mm thick
380 TBSC-K.II.08 Hot dipped GI Angle - Precoated - Grid: 19 mm x 19 mm
381 TBSC-K.II.09 Polyester painted GI - T Section - 24 x 32 mm
382 TBSC-K.II.10 Polyester painted GI - T Section - 24 x 25 mm
383 TBSC-K.II.11 Polyester painted GI - T Section - 24 mm x 27 mm
384 TBSC-K.II.12 Aluminium Angle : 24 mm x 24 mm
385 TBSC-K.II.13 Anodised Aluminium T Section : 24 x 24.5 x 2.4 mm
386 TBSC-K.II.14 Connecting Clips
387 TBSC-K.II.15 Rawl Plug
388 TBSC-K.II.16 6 mm Nylon Rawl Plug
389 TBSC-K.II.17 Soffit Cleats
390 TBSC-K.II.18 Drywall Screws - 25 mm
391 TBSC-K.II.19 Jointing Compound
392 TBSC-K.II.20 Jointing Paper Tape
393 TBSC-K.II.21 Drywall Top Coat
394 TBSC-K.II.22 Universal Holding Clips
395 TBSC-K.II.23 4 mm Dia GI Connecting Rod
396 TBSC-K.II.24 2 mm Dia GI Connecting Rod
397 SUB-SECTION WALL LINING & PANELLING
398 TBSC-K.III.01 Providing wooden panelling 12 mm thick Novapan one side laminated sheet fixed on
wooden frame of BT wood size 50.8 mm x 25.4 mm (2"x1") at distance of 609.6mm
(2'-0") intervals of both ways providing 3/4" x 1/2" (19.05 mm x 12.7 mm) size BT
wood ornamental cover beading and necessary screws, fevicol glue complete for
finished item of work.
399 TBSC-K.III.02 Perforated wall panels channeled wood works sheets of width 128 mm, thickness of
16mm and length 2440 mm made of a high density particle board substrate with a
laminated facing as per the approved shade/ species & finish and a melamine
balancing layer on the reverse side, with a special perforation pattern fluted
perforation on the visible surface with a minimum sag resistance of RH90 and a fire
rating class of 1 as per Part 7 of BS 476 with a “tongue-and-grooved” edges and the
back of the perforated panel is with sound absorbing non-woven acoustical fleece

400 TBSC-K.III.03 Supply and fixing of wall lining fixing to GI channels of perimeter channel 30mm x
27mm x 0.55 thick and ceiling channels of 51.1mm x 26mm x 10.5mm x 0.55mm
thick and fixing and finishing using joint compound and glass fibre tape complete finish
as per specification without painting for finished item of work: using 8mmthick
Calcium silicate boards
401 TBSC-K.III.04 Supply and fixing of wall lining fixing to GI channels of perimeter channel 30mm x
27mm x 0.55 thick and ceiling channels of 51.1mm x 26mm x 10.5mm x 0.55mm
thick and fixing and finishing using joint compound and glass fibre tape complete finish
as per specification without painting for finished item of work: Using 10mm thick
Calcium silicate boards
402 TBSC-K.III.05 Supply and fixing of wall lining fixing to GI channels of perimeter channel 30mm x
27mm x 0.55 thick and ceiling channels of 51.1mm x 26mm x 10.5mm x 0.55mm
thick and fixing and finishing using joint compound and glass fibre tape complete finish
as per specification without painting for finished item of work: Using 12mm thick
Calcium silicate boards
403 TBSC-K.III.06 Supply and fixing of cement board (conforming to IS:14862:2000) wall panelling with
frame work made of GI stud profile of size 48 x 40 x 10 x 0.55 mm thick placed at
every 610 mm C/C intervals fixed vertically in between floor and roof ‘U’ track of size
50 x 30 x 0.6 mm thick duly fixed with self-tapping, self-embedding screws fixed
around at every 300 mm (centres) leaving a 3 mm gap. The Gap will be covered with
a decorative beading or jointing compound. Surface will be given a smooth finish with
one coat of primer - With 8 mm Cement Bonded Board

404 TBSC-K.III.07 Supply and fixing of cement board (conforming to IS:14862:2000) wall panelling with
frame work made of GI stud profile of size 48 x 40 x 10 x 0.55 mm thick placed at
every 610 mm C/C intervals fixed vertically in between floor and roof ‘U’ track of size
50 x 30 x 0.6 mm thick duly fixed with self-tapping, self-embedding screws fixed
around at every 300 mm (centres) leaving a 3 mm gap. The Gap will be covered with
a decorative beading or jointing compound. Surface will be given a smooth finish with
one coat of primer - With 10 mm Cement Bonded Board
405 TBSC-K.III.08 Supply and fixing Cement Bonded Particle Board conforming to (IS 14276) wall
paneling using 10 mm Cement Bonded Particle Board conforming to IS 14276 with
frame work made of GI stud section of size 48mm x 35mm x 0.55mm thick placed at
every 610 mm C/C intervals vertically and at 1200mm internals horizontally fixed to the
wall by means of self expansion screws and caps and Cement Bonded Particle Board
conforming to IS 14276 is to be fixed to frame by means of self taping screws placed
at every 300 mm intervals leaving 3mm gap between two panels. The cost inclusive of
one coat of synthetic plastered primer and two coats of synthetic smooth finished putty
and cost & conveyance of all materials, labor charges etc. complete as per the
direction of Engineer in charge.

406 TBSC-K.III.09 Supply and fixing of Cement Bonded Pre-Laminated Particle Board wall paneling
using 12 mm Cement Bonded Pre-Laminated Particle with frame work made of G.I
stud section of size 48mm x 35mm x 0.55mm thick placed at every 610mm intervals
vertically and at 1200mm internals horizontally fixed to the wall by means of self
expansion screws and caps. Cement Bonded Pre-Laminated Particle is to be fixed to
frame by means of self-taping screws placed at every 300mm intervals leaving 3mm
gap between two panels. The cost inclusive of Conveyance of materials, Labor
charges etc., complete as per the direction of Engineer in charge

407 TBSC-K.III.10 Providing and fixing plain PVC rigid foam sheet wall panelling of thickness 5mm
consisting of panels having size 1220mm X2440mm stuck on inner frame work of
25mm wide strips of 5mm thick PVC rigid foam sheet. The strips should have in their
centre a grove of 6mm width and 2mm depth for sinking the head of the screw used to
fix the strips to the wall and should be placed vertically at equal intervals of
405/407mm centre to c entre. The PVC strips shall be fixed to the wall using 65mm
long M.S. screws through the groove in the strip by using PVC fasteners. The distance
between two screws shall not be more than 300mm. a groove of 2mm may be left
at the joint of two panels for aesthetic looks. This framework is done for making
existing wall surface in ensured level and for sticking the wall panelling sheet (panel)
on it with a strips of 5mm thick PVC sheet of width 75mm feathered at the edges
provided at the places where two panels are joined, using solvent cement, complete
as per direction of Engineer-in-Charge, manufacture’s specification & drawing

408 TBSC-K.III.11 Providing and fixing INSULATED PVC WALL panelling shall consist of PVC insulated
panels having wall thickness of 1mm /1.5mm/2mm PVC sheet and the desired
thickness of EPS (dependent on the insulation required) screwed into the wall using
screws of adequate length. The screws shall be placed at a distance of 150mm and
shall be 25mm from the edge of the insulated panel on all from sides of the panel. The
PVC strips of 5mm thick PVC sheet of width 75mm feathered at the edges shall be
stuck using solvent cement adhesive at the places where two panels are joined, so a
to cover the screw of both the panels, using solvent cement. 90 heat bent strips of
5mm thick PVC sheets of width 75mm X75mm feathered at the edges shall be stuck
at wall joints / pillars etc., complete as per direction of Engineer-in-Charge,
manufacture’s specification & drawing

409 TBSC-K.III.12 Supply and fixing of wall panelling on the framework of wooded rippers of 24 X 24mm
of required size. The entire framework shall be panelled with PVC section having
overall dimensions of 6 X 250mm with a wall thickness of 1mm ± 0.3mm. The panels
are joined with tongue and groove system. Necessary cut-outs for electrical
connections to be provided at required places complete, for finished item of work.

410 SUB-SECTION PARTIOINS


411 TBSC-K.IV.01 Supply & fixing 75mm thick metal stud partition using 12.5 mm thick Gypboard
conforming to IS 2095-1982 screw fixed to either side to 48 mm studs of 0.55 mm
thick with the 50 mm floor and ceiling channel 0.55 mm and the joints duly finished
with joint compound, paper tape and two coats Dry wall top coat as per specification.
412 TBSC-K.IV.02 Supply and Fixing 66mm thick metal stud partition screw fixed to either side of 48mm
studs of 0.55mm thick with 50mm floor and ceiling channel 0.55mm and the joints duly
finished with joining compound, glass fibre tape and two coats dry wall top coat as per
specification finished Item of work- using 8mm thick Calcium silicate boards

413 TBSC-K.IV.03 Supply and Fixing 66mm thick metal stud partition screw fixed to either side of 48mm
studs of 0.55mm thick with 50mm floor and ceiling channel 0.55mm and the joints duly
finished with joining compound, glass fibre tape and two coats dry wall top coat as per
specification finished Item of work - Using 10mm thick Calcium silicate boards

414 TBSC-K.IV.04 Supply and Fixing 66mm thick metal stud partition screw fixed to either side of 48mm
studs of 0.55mm thick with 50mm floor and ceiling channel 0.55mm and the joints duly
finished with joining compound, glass fibre tape and two coats dry wall top coat as per
specification finished Item of work - Using 12mm thick Calcium silicate boards

415 TBSC-K.IV.05 Supply and Fixing 66mm thick metal stud partition using 2 layers of 12mm thick
Calcium silicate boards screw fixed to either side to 48mm studs of 0.55mm thick with
50mm floor and ceiling channel 0.55mm.The boards joints are to be staggered to
avoid through passage. Ceramic wool of 50mm thick, 64kg/m3 density is to be placed
in cavity of the partition. The joints duly finished with joining compound, glass
fibre tape and two coats dry wall top coat as per specification with out painting for
finished item of work

416 TBSC-K.IV.06 Supply and fixing double skin Cement board (conforming to IS: 14862:2000) partition
with Frame work made of GI stud profile of size 48x40x10x 0.55 mm thick placed at
every 610 mm C/C intervals and 1220 mm horizontal intervals duly fixed with self-
expansion screws, the cement board of 8 mm thick cladded around with self-tapping
self-embedding screws fixed at every 300 mm (centres) leaving a 3 mm gap will be
covered with a decorative moulding surface will be given a smooth finish with one
cement primer. The rate is inclusive of cost and conveyance of all materials and
labour charges etc., complete.

417 TBSC-K.IV.07 Providing and fixing of 50 mm thick SOLID WALL PANEL Sandwich panels made of
light Weight FRACC two 5 mm thick non- asbestos fibre reinforced cement sheets
(conforming to IS: 14862:2000) on either side of the lightweight concrete core
composed of Portland cement binders with tongue and groove arrangement. The
bottom of the panel shall be fixed to the floor channel made up of 1 mm thick GI
channels of size 28x52x31 mm fixed to the existing floor with 6x60mm nylon self
expansion screws at 600 mm C/C and top of the panel fixed with ceiling channel made
out of 0.8 mm thick GI Channel of size 31x52x31 mm duly fixed to the existing ceiling
with 6x60mm nylon self expansion screws at 600 mm C/C. All the tongue and
groove joints of the panels have to be properly cleaned and both the panels
have to be fixed by applying the mixture of fly ash and sodium silicate in between
and Everest jointing compound all the exposed joints. The rate includes cost of 50 mm
SOLID WALL PANELS, G.l. Floor and ceiling channel. The panels can be flushed by
using paper tape and Everest jointing compound all complete
418 TBSC-K.IV.08 Providing and fixing of 75 mm thick SOLID WALL PANEL Sandwich panels made of
light Weight FRACC two 5 mm thick non- asbestos fibre reinforced cement sheets
(conforming to IS: 14862:2000) on either side of the lightweight concrete core
composed of Portland cement binders with tongue and groove arrangement. The
bottom of the panel shall be fixed to the floor channel made up of 1 mm thick GI
channels of size 28x77x31 mm fixed to the existing floor with 6x60mm nylon self
expansion screws at 600 mm C/C and top of the panel fixed with ceiling channel made
out of 0.8 mm thick GI Channel of size 31x77x31 mm duly fixed to the existing ceiling
with 6x60mm nylon self expansion screws at 600 mm C/C. All the tongue and
groove joints of the panels have to be properly cleaned and both the panels
have to be fixed by applying the mixture of fly ash and sodium silicate in between
and Everest jointing compound all the exposed joints. The rate includes cost of 75 mm
SOLID WALL PANELS, G.l. Floor and ceiling channel. The panels can be flushed by
using paper tape and Everest jointing compound all complete

419 TBSC-K.IV.09 Providing and fixing of 50 mm thick partition with composite panel comprise of two 5
mm thick non- asbestos fibre reinforced cement sheets (conforming to IS:
14862:2000) on either side of the lightweight concrete core composed of Portland
cement binders with tongue and groove arrangement. The bottom of the panel shall
be fixed to the floor channel made up of 1 mm thick GI channels of size 28x52x31
mm fixed to the existing floor with 6x60mm nylon self expansion screws at 600 mm
C/C and top of the panel fixed with ceiling channel made out of 0.8 mm thick GI
Channel of size 31x52x31 mm duly fixed to the existing ceiling with 6x60mm nylon
self expansion screws at 600 mm C/C. All the tongue and groove joints of the
panels have to be properly cleaned and both the panels have to be fixed by
applying the mixture of fly ash and sodium silicate in between and Everest jointing
compound all the exposed joints. The rate includes cost of 50 mm SOLID WALL
PANELS, G.l. Floor and ceiling channel.

420 TBSC-K.IV.10 Providing and fixing of 75 mm thick partition with composite panel comprise of two 5
mm thick non- asbestos fibre reinforced cement sheets (conforming to IS:
14862:2000) on either side of the lightweight concrete core composed of Portland
cement binders with tongue and groove arrangement. The bottom of the panel shall
be fixed to the floor channel made up of 1 mm thick GI channels of size 28x77x31
mm fixed to the existing floor with 6x60mm nylon self expansion screws at 600 mm
C/C and top of the panel fixed with ceiling channel made out of 0.8 mm thick GI
Channel of size 31x77x31 mm duly fixed to the existing ceiling with 6x60mm nylon
self expansion screws at 600 mm C/C. All the tongue and groove joints of the
panels have to be properly cleaned and both the panels have to be fixed by
applying the mixture of fly ash and sodium silicate in between and Everest jointing
compound all the exposed joints. The rate includes cost of 75 mm SOLID WALL
PANELS, G.l. Floor and ceiling channel.

421 TBSC-K.IV-11 Supply and fixing double skin partition using with 10 mm Cement Bonded
Particle Board conforming to IS 14276 made out of G.I. track section of
size 50mm x 35mm x 0.55 mm for fixing to the roof and floor and stud
section of size 48mm x 35mm x 0.55mm placed in track section vertically at
610mm intervals and at 1200mm intervals horizontally fixed to the wall by
means of self expansion screws and caps to the wall and roof the panel is to be
fixed both sides of frame work by using self taping screws fixed at every 300mm
intervals to the frame work leaving 3 mm gap between two panels. The
cost inclusive with one coat of synthetic primer and two coats of synthetic
plaster smooth finish and cost and conveyance of all materials to site, labor
charges etc., complete as per the direction of Engineer in charge.
422 TBSC-K.IV-12 Supply and fixing of Cement Bonded Prelaminated Particle Board double
skin partition using with 10 mm Cement Bonded Prelaminated Particle Board
made out of G.I track section of size 50 mm x 35mm x 0.55mm for fixing to the
roof and floor and stud section of size 48mm x 35mm x 0.55mm placed
in track section vertically at 610mm intervals and at 1200mm internals
horizontally. The frame is fixed by means of self expansion screws and
caps to the wall / roof. Cement Bonded Prelaminated Particle Board is to be
fixed both sides of the frame work by using 2mm thick electro plated CR flat
section leaving 3mm gap between two panels. The cost inclusive of cost and
conveyance of all materials to sites, other materials incidentals and labour charges
as per the direction of Engineer in charges.

423 TBSC-K.IV-13 Supply and fixing of Cement Bonded Prelaminated Particle Board
aluminum glazed partitions using 10MM Cement Bonded Prelaminated Particle
Board and 5.00 mm thick plain glass to full height. Using with Cement Bonded
Prelaminated Particle Board to a height of 0.91 meter at bottom panel and
remaining height with glass and aluminum sections anodized to 12 to 15
microns and of sections of size 37mm x 62mm and 1.5mm thickness with
one meter centre to centre duly fixed with clip beading on both sides
including fixing the frame to pillars by M.S. flats, bolts and nuts including cost
and conveyance of all materials etc., complete as directed during execution.

424 TBSC-K.IV-14 Providing and fixing 50mm thick SEMI HEIGHT SOLID PVC PARTITION
consisting of 49mm sandwich PVC panel made out of 36mm high density
expanded polystyrene sheet (E.P.S.-Thermocol) stuck on both side with 2mm
thick plain/printed /prelam PVC rigid foam sheets reinforced with frame work
made from 35mm X 5mm M.S. Angle. In between two M.S. Angles 5mm thick plain /
printed /prelam heat molded PVC ‘C’ channel of size 50 X 100mm with feathered
edges shall be fixed on the floor & 50 X 75mm with feathered edges
plain/printed /prelam PVC ‘C’ channel. In between adjoining EPS sandwiched
PVC partitions panel 5mm thick X 75mm width plain / printed / prelam PVC
sheet feathered at edges shall be stuck on front & back face using solvent
cement etc. in places where two partitions meet to from an ‘L’ shape the panels
are joined 5mm thick plain/printed / prelam heat molded PVC ‘L’ section of size
75mmX75mm with feathered edges shall be fixed on front & back side. This is
done to maintain the symmetry of design. An additional 5mm thick PVC strip of
40mm width is to be stuck on the interior side of the ‘C’ Channel using PVC solvent
adhesive, complete as per direction of Engineer-in-Charge, manufacture’s
425 TBSC-K.IV-15 Supply and fixing of PVC Double Skin Partition. The entire framework shall be
carried out by mild steel section having overall dimensions of 24 X 48mm with a wall
thickness of 1.2mm. The entire framework shall be concealed with PVC section
having overall dimensions of 6 X 250mm with a wall thickness of 1mm ± 0.3mm
both sides. Glass provision /Door provision can be provided along the partition
wherever required. Partitions can be made full or half as per requirement
complete, for finished item of work.

426 TBSC-K.IV-16 Supply and fixing double skin cement based Board partition with Frame work
made of GI stud profile of size 48x40x 10x 0.6 mm thick placed at every 610
mm C/C intervals and 915 mm horizontal intervals duly fixed with self
expansion screws, the Cement Bonded Board of 8 mm thick cladded around
with self tapping self embedding screws fixed at every 300 mm (centres) leaving
a 3 mm gap between two panels of width 2’- 0”(610 mm). The Gap will be
covered with a decorative molding surface will be given a smooth finish over
cement primer. The rate Inclusive of cost and conveyance of all materials
and labour charges etc., Complete. DOUBLE SKIN PARTITION
427 TBSC-K.IV-17 Supply and fixing of partitions made of seccolor pre- painted steel (base steel
as per IS 513 of 0.58 mm thick ‘D’ quality, galvanized as per IS 277 with Zinc
of 120 GSM). Primer coated with epoxy primer of 5-7 microns thick, finish
painted with a polyester paint of 12-16 microns thick alkyd backer. Section for
outer frame should be 46 x 52mm, section for shutter should be 46 x 46mm,
section for mullion should be 46 x 70mm, section for beading should be 18x25mm
and section for middle and bottom rail (Lock Rail and Kick Rail) of size should be
23x130mm. The partition should be paneled with 9mm pre-laminated particle
board to a height of 0.91m from the bottom, and remaining height with 5mm thick
plain glass With Ethyl Propylene Diametermine Monomer (EPDM) Gaskets. The
sections are to be cut to length, mitre joined with corner bracket Centre mullions are
to be fixed using mullion cap. Gaskets made of Ethyl Propylene Diametermine
Monomer (EPDM). Corner brackets made of CRCA with zinc phosphate. Mullion
caps made of Glass filled nylon. The above frames should be fixed to the
concrete / masonry wall by means of self expanding screws, and complete for
428 TBSC-K.IV-18 Supply and fixing of partitions made of seccolor pre- painted steel (base steel
as per IS 513 of 0.58 mm thick ‘D’ quality, galvanized as per IS 277 with Zinc
of 120 GSM). Primer coated with epoxy primer of 5-7 microns thick, finish
painted with a polyester paint of 12-16 microns thick alkyd backer. Section for
outer frame should be 46x52mm, section for shutter should be 46 x 46mm,
section for mullion should be 46 x 70mm, section for beading should be
18x25mm and section for middle and bottom rail (Lock Rail and Kick Rail) of size
should be 23x130mm. The partition should be paneled with 9mm pre-laminated
particle board to a height of 0.91m from the bottom, and remaining height with
5mm thick plain glass With Ethyl Propylene Diametermine Monomer (EPDM)
Gaskets. The sections are to be cut to length, mitre joined with corner bracket Centre
mullions are to be fixed using mullion cap. Gaskets made of Ethyl Propylene
Diametermine Monomer (EPDM). Corner brackets made of CRCA with zinc
phosphate. Mullion caps made of Glass filled nylon. The above frames should
be fixed to the concrete / masonry wall by means of self expanding screws, and
complete for finished item of work Fixed Partition with Door: Outer frame section size

L SECTION DOORS, SHUTTERS & FRAMES


(Landing cost - including cost of conveyance, loading & unloading)
I SUB-SECTION DOOR FRAMES
427 TBSC-L.I-01 Mild Steel Hallow single rebate general purpose door frames manufactured using
cold roll formed process steel sheet of 1.25mm thick bright (Cold Rolled Close
Annealed (CRCA) and profile-B of size 105 x 60 mm onforming to IS 4351 -
2003 including pretreatment, phosphating with Hinges, Base Ties, Holdfast
Lugs, ortar Guards, shock absorbers and provision for ower Bolts, Aldrops, Lock
& Strike plates etc. for both single and double shutter doors

428 TBSC-L.I-02 Powder Coated Mild Steel Hallow single rebate door frames manufactured using
cold roll formed process steel sheet of 1.25 mm thick bright (Cold Rolled
Close Annealed (CRCA) and profile size of 105 x 60 mm conforming to
IS 4351 - 2003 including pretreatment, Galvanized as per IS:277, zinc
phosphating finished with Thermosetting Polyurethane paint of Aliphatic Grade
providing high levels of scratch resistance and durability / Epoxy polyester powder
for powder coating paint thickness 60 – 65 microns (Dry film thickness) Stainless
Steel Ball Bearing Butt Hinges 3mm thick fixed flush to the frame with Hinges,
Base Ties, Holdfast Lugs, Mortar Guards, shock absorbers and provision for
Tower Bolts, Aldrops, Lock & Strike plates etc. for both single and double shutter
doors

429 TBSC-L.I-03 Providing and fixing factory made polyvinyl chloride (PVC) Door Frame of
the size 50 x 47mm with a wall thickness of 5mm, made out of extruded 10
mm rigid PVC foam sheet, mitre cut at two corners and joined with 2nos. of
150mm long brackets of 15x15mm M.S. square tube. The two vertical door
profiles are to be reinforced with 19x19mm M.S. Square tube of 19 gauge. The
door frame shall be fixed to the wall using 65/100mm long M.S. Screws
through the frame by using PVC fasteners. A minimum of 4nos. of screws to be
provided for each vertical member & minimum 2nos. for horizontal member etc.
complete as per manufacturers specification and direction of Engineer-in-Charge
for finished item of work
430 TBSC-L.I-04 SUPPLY & FIXING SINGLE SIDE PRELAM SOLID PANEL PVC DOOR FRAME
(CHOUKHAT) Providing and fixing factory made Pac single side Prelam door
frame of the size 50 X 47 mm with a wall thickness of 5mm, made out of extruded
5mm rigid Pac single side prelam sheet, meter cut at two corners and
joined with 2nos. of 150mm long brackets of 15 x 15mm MS. Square tube. The
two vertical door profiles are to be reinforced with 19 X 19mm MS. square
tube of 19guage. The door frame shall be fixed to the wall using 65/100mm
long MS. Screws through the frame by using Pac fasteners. a minimum of
4nos. of screws to be provided for each vertical member and minimum 2nos. for
horizontal member etc. complete as per manufacture specification and direction
of Engineer-in-charge.

431 TBSC-L.I-05 Supply and fixing of door frame made of hollow extruded PVC section having
dimensions of 40 X 57mm with the wall thickness of 2mm +/- 0.2mm duly
reinforced with seasoned wood plank at the hinges side.The door frame top 2
corners shall be metri-cut/ welded. PVC DOOR FRAME.
432 TBSC-L.I-06 Supply and fixing of door frame made of hollow extruded PVC section having
dimensions of 40 X 46 mm with the wall thickness of 2mm +/- 0.2mm duly reinforced
with seasoned wood plank at the hinges side. The door frame top 2 corners shall be
mitre cut/welded
433 TBSC-L.I-07 Supply & fixing of Door frames made of all formed sections of 1.25mm thick CRCA
section, size should be 50x60mm with 32mm rebate. The corner of the frame
should be welded. The frame should be painted with one coat of primer and finished
painted with pure polyester paint. The frame should be provided with approved
quality butt hinges of 3 Nos. complete for finished item.: Single shutter 3'-0" x 7'-0"
( 914.4 x 2133.6mm ) outer frame section size of 50 x 60 mm

434 TBSC-L.I-08 Supply & fixing of Door frames made of all formed sections of 1.25mm thick CRCA
section, size should be 50x60mm with 32mm rebate.The corner of the frame
should be welded. The frame should be painted with one coat of primer and
finished painted with pure polyester paint. The frame should be provided with
approved quality butt hinges of 3 Nos. complete for finished item.: Double shutter 5'-
0" x 7'-0" (1524 x 2133.6mm) outer frame section size of 50 x 60 mm

435 TBSC-L.I-09 Supplying & fixing of Door frame made of roll formed section of 1.25 mm thick
CRCA section, size should be 50 x 75 mm with 32 mm rebate. The corner of the
frame should be welded. The frame should be painted with one coat of primer and
finished painted with pure polyester paint. The frame should be provided with
approved quality butt hinges of 3 Nos. Complete for finished item of work.: Single
shutter 3'-0" x 7'-0" (914.4x2133.6mm) outer frame section size of 50 x 75 mm

436 TBSC-L.I-10 Supplying & fixing of Door frame made of roll formed section of 1.25 mm thick
CRCA section, size should be 50 x 75 mm with 32 mm rebate. The corner of the
frame should be welded. The frame should be painted with one coat of primer and
finished painted with pure polyester paint. The frame should be provided with
approved quality butt hinges of 3 Nos. Complete for finished item of work.: Single
shutter 5'-0" x 7'-0" (1524x2133.6mm) outer frame section size of 50 x 75 mm
437 TBSC-L.I-11 Providing and fixing door frames fabricated from sections made of galvanized steel
powder coated (base steel as per IS 513, galvanized as per IS 277 with zinc of 120
grams / square metre), the factory made section are powder coated with pure
polyester powder of 50-60 microns thick with total coated thickness of 1.25
mm, size of door frame section is of 105 x 60 mm with a rebate of 38 mm
to accommodate 35 mm thick door shutter, with groove to insert gasket in
the frame section, frame section filled with polyurethane foam, cut to length, and
joined by way of welding, each frame provided with: a) 2mm thick MS powder
coated butt hinges of 100 mm long – 3 Nos. for single shutter, 6 Nos. for double
shutter. b) CRCA electroplates stiffeners of 6 Nos – 3 in each vertical. c) 40 mm x
200 mm x 1.2 mm hold fasts screwed to stiffeners – 6 Nos. with split end tail.
d) Nylon Aldrop Receiver – 1 No. for single shutter frame. e) Tie Rod – 1 No

438 TBSC-L.I-12 Providing and fixing of door frames factory made, internal door frames
without threshold, fabricated from pre painted cold roll formed section 100 mm x
60 mm made of galvanized (base steel as per IS-513 ‘D’ quality galvanized as
per IS-277 with Zinc of 120 Gms/sqm) steel colour coated sections with total
coated thickness of 1 mm primer coated with epoxy primer of 5-7 microns
thick finish painted with polyester paint of 12- 16 microns and back coated with
alkyd backer of 5-7 microns, the frame section filled with polyurethane (PU Foam)
of 40 kg/Cum and the sections cut to length and mitre joined by means of
1.25 mm thick CRCA electroplated corner brackets of size 75 x 75 mm and 1.25
mm thick electroplated stiffeners of size 150 mm for fixing hold fasts and
hinges with MS Powder coated fittings a) 6 Nos M.S. Z Type hold fasts made of 30
mm x 3 mm MS flat of 230 mm long, 3 Nos Each size expandable PVC
covered screw type fasteners b) 2.5 mm x 300 mm long ‘T’ hinges /2.5 mm x 50
mm x 50 mm x 100 mm two way but hinges (3 Nos for single leaf or 2 Nos for
Double leaf/leaf) c) 12 mm Diameter MS tie rod at bottom with necessary size of nuts
on either side.
439 TBSC-L.I-14 Supply and fixing of factory made Bathroom door frames without threshold,
fabricated from pre-painted cold roll formed section 50mm x 50 mm made of
galvanized steel as per IS – 513 ‘D’ quality, galvanized as per IS-277 steel colour
coated sections primer coated with epoxy primer finish painted with polyester
paint the frame section filled with polyurethane (P.U. Foam) of 40 Kg/Cum; and
the sections joined by means of 1.25mm thick CRCA electroplated corner
brackets of size 75 x 75 mm and 1.25mm thick electroplated stiffeners of size
150mm for fixing hold fasts and hinges together with the following MS Power
coated fitting (Supply and fixing) of approved make. a) 6 Nos M.S. Z. Type
hold fasts made of 30mm x 3 mm MS flat of 230mm long, 3 Nos each side
expandable PVC covered screw type fasteners b) 2.5mm x 300 mm long ‘T’
hinges / 2.5mm x 50 mm x 100mm two way but hinges (3 Nos for single leaf or 2
Nos for Double leaf /leaf )c) 12 mm Diameter MS tie rod at bottom with necessary
size of nuts on either side.

440 TBSC-L.I-16 Supply of factory made Precast Reinforced Cement concrete door frame of with
overall dimension of 60 x 100 mm for single shutter door (+/-2mm) three nos, of
6mm dia steel bars are used for longitudinal reinforcement for each vertical and
horizontal member and are held firmly by 3mm dia ties spaced at not more than
300mm c/c Polymer wonder blocks are provided in the frames for tower bolt and
hinges provisions made in the frame for aldrops provisions are made in the
vertical member for fixing of 3 nos.hold-fasts with 8 mm dia bolts and the frame
surface shall be smooth without any voids and shall confirm to IS 6523
complete finished item including all taxes as per specifications & the directions of
the Engineer-in- Charge.

441 TBSC-L.I-18 Supply of factory made Precast Reinforced Cement concrete double door frame of
the door frame shall have overall dimension of 60 x 125 for single shutter door(+/-
2mm) four nos, of 6mm dia steel bars are used for longitudinal reinforcement for
Each vertical and horizontal member and are held firmly by 3mm dia ties spaced at
not more than 300mm c/c Polymer wonder blocks for fixing of towerbolt and
hinges with provision for aldrops and 3 nos. hold-fasts with 8mm dia bolts and the
frame surface shall be smooth without any voids and shall confirm to IS 6523
complete finished item including all taxes as per specifications & the directions of
the Engineer-in-Charge.
442 TBSC-L.I-20 Fixing of precast RCC frames (Precast RCC framed members to be supplied at
site) including assembling the members for door frames fixing to MS masonry
or RCC wall face including providing and fixing Six no. hold-fasts of MS
Flat 40x5mm and length 40cm per frame embedding in cement concrete
blocks of size 30x10x15 cm of mix (1 cement:3 Coarse sand: 6 graded stone
aggregate 20 mm nominal size) complete as per specification & the directions of
the Engineer-in-Charge

II SUB-SECTION DOOR SHUTTERS WITHOUT FRAMES


443 TBSC-L.II-01 Flush door shutters, solid bond wood block board type with teak ply on both
faces.: 25 mm thick conforming to IS:2202
444 TBSC-L.II-02 Flush door shutters, solid bond wood block board type with teak ply on both
faces.: 30 mm thick conforming to IS:2202
445 TBSC-L.II-03 Flush door shutters, solid bond wood block board type with teak ply on both
faces.: 35 mm thick conforming to IS:2202
446 TBSC-L.II-04 Flush door shutters, solid bond wood block board type with commercial ply on both
faces.: 25 mm thick conforming to IS:2202
447 TBSC-L.II-05 Flush door shutters, solid bond wood block board type with commercial ply on both
faces.: 30mm thick conforming to IS:2202
448 TBSC-L.II-06 Flush door shutters, solid bond wood block board type with commercial ply on both
faces.: 35mm thick conforming to IS:2202
449 TBSC-L.II-07 Flush door shutters, solid bond wood block board type with commercial ply on
both faces.: 40mm thick conforming to IS:2202
450 TBSC-L.II-08 Flush door shutters, solid bond wood block board type with teak veneer on one
face and commercial ply on another face (lipping): 20 mm thick conforming
to IS:2202
451 TBSC-L.II-09 Flush door shutters, solid bond wood block board type with teak veneer on one face
and commercial ply on another face (lipping): 25mm thick conforming to IS:2202

452 TBSC-L.II-10 Flush door shutters, solid bond wood block board type with teak veneer on one face
and commercial ply on another face (lipping): 30mm thick conforming to IS:2202

453 TBSC-L.II-11 Flush door shutters, solid bond wood block board type
with teak veneer on one face and commercial ply on
another face (lipping): 35 mm thick conforming to
IS:2202
454 TBSC-L.II-12 Flush door shutters, solid bond wood block board type
with teak veneer on one face and commercial ply on
another face (lipping): 40 mm thick conforming to
IS:2202
455 TBSC-L.II-13 Supply and fixing of Cement Bonded Prelaminated
Particle Board single door shutter using 16MM Cement
Bonded Prelaminated Particle Board with all round
section “U” size of mm thick galvanized pre-painted cold
rolled steel profiles Cement Bonded Prelaminated
Particle Board with necessary screws fixed at every 1’0”
( 304.8mm) intervals. The cost inclusive of MS Nickel
coated 250mm long Aldrops 2 no’s , MS powder coated
250mm long tower bolt 1 no’s, 2no’s MS powder coated
125mm long grip handle, 1 no’s M.S.P.C. Door stopper.
Including cost and conveyance of all materials at site
labour charges etc., complete finished item of work.
456 TBSC-L.II-14 Supply and fixing of Cement Bonded Prelaminated
Particle Board double door shutter using 16MM Cement
Bonded Prelaminated Particle Board with all round “U”
section size of 20mm x 18mm x 20mm made from
0.6mm thick galvanized pre-painted cold rolled steel
profiles with Cement Bonded Prelaminated Particle
Board separating two shutter with 30mm x 20mm x
30mm stepped lipping with necessary screws fixed at
every 1’0” (304.8mm) intervals. The cost inclusive of MS
Nickel coated 250mm long Aldrops 2no’s, MS powder
coated 125mm long grip handle, 2 no’s M.S.P.C. Door
stopper. Including cost and conveyance of all materials
at site labour charges etc., complete finished item of
work.

457 TBSC-L.II-15 Supply and fixing of Cement Bonded Prelaminated


Particle Board door shutter made out of U sections of
size 12x14x12 made from 0.6mm thick pps sections
with 12MM Cement Bonded Prelaminated Particle
Board with necessary screws fixed at every
1’.0”interwells. The hardware consists of 250mm long
Aldrop – 2 Nos.150mm Handle- 1 No , 150 mm long ms
powder coated tower bolt 1 no. nickel coated. The cost
is inclusive of all incidentals, labor transportation
charges.

458 TBSC-L.II-16 Supply and fixing of Cement bonded Particle BOARD


(conforming to IS 14862) door shutter with all-round
style “U” lipping size 15 x 18 x 15 mm made from 0.8
mm thick powder coated cold rolled steel profiles with
16 mm thick Cement bonded Particle BOARD with
necessary screws fixed at 1’-0” interval 250 mm long
Aldrops 2 nos. M.S. nickel coated 250 mm long 1 no. M.S.
Tower Bolts Including cost and conveyance of all
materials at site and applying 1 coat of primer, 2 coats of
luppum and 2 coats of synthetic enamel paint as per
approved design for finished item of work.

459 TBSC-L.II-17 Supply and fixing of Cement bonded Particle BOARD


(conforming to IS 14862) 12 mm thick door shutter of
size 6’0” x 2’6” with all-round style “U” lipping size 15 x
14 x 15 mm made from 0.8 mm thick powder coated
cold rolled steel profiles with necessary screws fixed at
1’-0” interval 250 mm long Aldrops 2 nos. M.S. nickel
coated 250 mm long 1 no. M.S. Tower Bolts Including
cost and conveyance of all materials at site and applying
1 coat of primer, 2 coats of luppum and 2 coats of
synthetic enamel paint as per approved design for
finished item of work.

460 TBSC-L.II-18 Supply and fixing door shutter with frame made out of
PVC section and panels conforming to IS:10151-1982
having panel sizes of 100 mm x 30 mm with self
extruded grooves at 40 mm x 50 mm grooves on front
face and the infill panel dimension is 610 mm x 20 mm
seamless hallow multi chambered PVC single panel for finished item of work

461 TBSC-L.II-19 Molded panel solid core flush doors using water-
resistant hardwood fibre HDF / MDF fibre boards skins
of 2.5 mm thick of 30 mm thick
462 TBSC-L.II-20 Molded panel solid core flush doors using water- resistant hard wood fibre HDF /
MDF fibre boards skins of 2.5 mm thick 35 mm thick
463 TBSC-L.II-21 Solid core membrane flush doors using rigid PVC membrane of 0.3mm thick of
different elegant shades doors - 30 mm thick
464 TBSC-L.II-22 Solid core membrane flush doors using rigid PVC membrane of 0.3mm thick of
different elegant shades doors - 35 mm thick
465 TBSC-L.II-23 Providing and fixing 35mm thick FACTORY MADE MOULDED DOOR SHUTTER
consisting of solid core single leaf flush door of 30mm thickness, lipped with
15mm ( 5mm X 3 ) thick X 30mm width on one stiles and top rails and 10mm
(5mm X 2 ) thick X 30mm width on the other stiles and bottom rails. The
inner panel laminated with 2mm thick termite proof, water proof and fire
resistant molded Pac sheet with 2,4,6 raised panel design in different panel
and / or prelam colours on one side after routing the molded design on flush
door and 2mm prelam Pac sheet on other side using rubber adhesive on
flush door and solvent cement adhesive on Pac lipping etc. complete as per
direction of Engineer-in-Charge, manufacture specification and drawing.

466 TBSC-L.II-24 Supply & Fixing SOLID STEEL DOOR shutter made out of G I Precoated Sheet with
an average wall thickness of 0.35 mm on both sides. MS Tube having dimensions
of 19 x 19 mm is inserted along the hinge side of the door, core of the door
shutter filled with High Density Polyurethane foam injected with the help of
hydraulic injection method, four sides of the door covered with G I Precoated Sheet
and the hardware locations reinforced with suitable wooden blocks as per drawing
and stickers indicating location of the hardware pasted at appropriate places, etc
complete

467 TBSC-L.II-25 Providing of 35mm thick Factory made Prelaminated ABS (Acrolynitrile Butadyne
Styrene) Door shutter moulded in different designs, consisting of all round Frame
made out of water proof solid foam PVC bar of size 20x32mm, reinforced by 32x
32mm - 2 nos. for vertical made out of LVL (Laminated Veneer Lumber),
core material of 32 mm thick high density craft paper honey comb board,
sandwiched on both sides with prelaminated ABS sheet thickness of
1.5mm . PVC edge banding of size 0.45mm on the vertical sides for each
shutter and ISI make S.S round lock complete for finished item of work

468 TBSC-L.II-26 Supply and fixing of Cement Bonded Prelaminated Particle Board door shutter
conforming to IS-14276 made out of U sections of size 12 x 18 x 12 made
from 0.6mm thick PPS sections with 16 mm Cement Bonded Prelaminated Particle
Board with necessary screws fixed at every 1’.0”interwells. The hardware
consists of 12 mm dia x 200mm long Aluminium Aldrops – 2 Nos. 125 mm long
Handle- 2 Nos. 3 mm x 12 mm x 180 mm long 304 SS hinges- 3 Nos with pole
receiver of 10mm dia pole X40mm long welded on 2mm X40mm(ss304) plates
works as receiver for RT patte hinges. The cost is inclusive of all
incidentals, labour transportation charges.

III SUB-SECTION DOORS WITH SHUTTERS&FRAMES


467 TBSC-L.III-01 Providing and fixing 30mm thick Solid panel PVC door shutter consisting of
frame made out of M.S. tubes of 19 gauge thickness and size of 19mm x 19mm
for stiles, & 15mm x 15mm for top & bottom rails. M.S. frame shall have a coat
of steel primers of approved make and manufacture. M.S. frame shall be
covered with 5mm thick heat molded PVC ‘C’ channel of size 30 x 50mm
forming stiles, and 5mm thick, 75mm wide PVC sheets for top rail, lock rail &
bottom rail on either side, and 10mm (5mm x 2) thick, 20mm wide cross PVC
sheet as gap insert for top rail & bottom rail. Paneling of 5mm thick PVC
sheet to be fitted in the M.S. frame welded / sealed to the stiles & rails with
30mm wide x 5mm thick PVC sheet beading on either side, and joined together
with solvent cement adhesive etc. An additional 5mm thick PVC strip of 20mm
width is to be stuck on the interior side of the ‘C’ Channel using PVC
solvent adhesive. Complete as per direction of Engineer-in- charge,
manufacturer’s specification & drawing for finished item of work .
468 TBSC-L.III-02 Providing and fixing 30mm thick FACTORY MADE
BOTHSIDE PRELAM SOLID PANEL PVC DOOR SHUTTER
consisting of frame made out of MS. Tubes of 19gauge
thickness and size of 19mmX19mm for stiles, top and
bottom rails. MS. Frame shall have a coat of steel
primers of approved make and manufacture. MS. Frame
covered with 5mm thick heat molded Prelam Pac ‘C’
channel of size 30mm thickness, 70mm width out of
which 50mm shall be flat and 20mm shall be tapered in
450 angle on either side forming stiles; and 5mm thick,
95mm wide Prelam Pac sheet out of which 75mm shall
be flat and 20mm shall be tapered in 450 on the inner
side to form top and bottom rail 115mm wide Prelam
Pac sheet out of which 75mm shall be flat and 20mm
shall be tapered on both sides to form lock rail. Top,
bottom and lock rail shall be provided either side of the
panel. 10mm (5mmX2) thick, 20mmwide cross Pac
sheet shall be provided as gap insert for top and bottom
rail. Paneling of 5mm thick both side Prelam Pac sheet
to be fitted in the MS. Frame welded/ sealed to the
stiles & rails with 7mm(5mm+2mm) thick X 15mm wide
Pac sheet beading on inner side, and joined together
with solvent cement adhesive etc. an additional 5mm
thick Pac strip of 20mm width is to be stuck on the
interior side of the ‘C’ channel using Pac solvent cement
adhesive etc. complete as per direction of Engineer – in-
charge, manufacture specification and drawing.

469 TBSC-L.III-03 Providing and fixing 30mm thick FACTORY MADE


SOLID SINGLE SIDE PRELAM PANEL PVC DOOR
SHUTTER consisting of frame made out of MS. Tubes of
19gauge thickness and size of 19mmX19mm for stiles,
and 15mmX15mm for top and bottom rails. The MS.
Frame shall have a coat of steel primers of approved make and
manufacture. MS. Frame covered with 5mm
thick heat molded single side Prelam Pac ‘C’ channel of
size 30mmX50mm to form stiles.5mm thick& 75mm
wide single side prelim Pac sheets shall be for the top,
bottom and lock rails. Paneling of 5mm thick one side
Pac sheet to be fitted in the MS. Frame and sealed to the
front (prelam side) stiles and rails (which should have a
5mm 45 bent portion as beading) and attached to the
back(white/ivory) stiles and rails which should have a
10mm 900 bent portion as beading ) using 2nos. 15mm
wide X 5mm thick Pac sheet beading inside the 90 bent
beading. All stiles, rails and beadings are to be joined to
the panel using solvent cement etc. an additional 5mm
thick Pac strip of 20mm width to be stuck on the
interior side of the ‘C” channel using Pac solvent cement
adhesive and 10mm(5mmX2) thick, 20mm wide cross
Pac sheet to be fitted as gap insert for top and bottom
rail etc. complete as per direction of Engineer –in-
Charge, manufacture specification and drawing.
470 TBSC-L.III-04 MOULDED PVC DOOR – WOOD FREE Providing and
fixing 30mm thick Brand factory made Molded door
shutter- wood free consisting of frame made out of MS.
tubes 19gauge thickness and size of 25mmX25mm for
stiles, top and bottom rails. MS. Frame shall have a coat
of steel primers. The inner panel shall consist of 25mm
thick High density EPS conforming to IS 4671-1984
bounded with 2mm thick termite proof, water proof and
fire resistant molded Pac sheet with 2,4,6 raised panel
design in different plain and / or prelam colours after
routing to the molded design on one side and 2mm plain
and / or prelam Pac sheet on other side of the EPS. The
edge of panel to be sealed with lipping of 10mm wide
PVC sheet bottom (made by sticking 2 rigid foam sheet
of 5mm thickness using Pac solvent cement) and stiles
sides 25mm(5mmX5) thick and 30mm width Pac sheet
fitted along Ms. Tube for lock provision for lock height
5mm thick Pac sheet of size 150mmX100mm fixed with
upper and lower face of inner side of EPS Panel etc.
Complete as per direction of Engineer – in-Charge,
manufacture specification and drawing

471 TBSC-L.III-05 Providing and fixing 30mm thick FACTORY MADE WIRE
MESH SOLID PVC DOOR SHUTTER consisting of frame
made out of M.S. tubes of 19 gauge thickness and size of
19mmX19mm for stiles and 15mm for top, lock &
bottom rails. MS. Frame shall have a coat of steel
primers of approved make and manufacture.
19mmX19mm M.S. square tubes shall be covered with
5mm thick heat molded “” PVC ‘C’ channel of size 30mm
thickness, 90mm width out of which 75mm shall be flat
and 15mm shall be flat and 15mm shall be bent in 900
on the inner side to from top and bottom rail land
130mm wide PVC sheet out of which 100mm shall be
flat and 154mm shall be bent in 900 on both side to
from lock rail, 10mm(5mmX2) thick, 20mm wide cross
PVC sheet as gap insert for top rail & bottom rail. Panel
will be of G.I. wire mesh of 24gauge to be fitted in by ’C’
channel of size 35mm X10mm on the either side in the
stiles. The inner side ‘C’ channel is fixed by
19mmX19mm MS. Tube on both sides with screws. The
wire mesh in top bottom & lock rail is sealed with15mm
X 15mm tube with G.I. wire 10mm(5mmX2) thick PVC
strip of 25mm width is to be stuck& nails on both side of
G.I. wire mesh interior at the top, bottom & lock rail. An
additional 5mm thick PVC strip of 20mm width is to be
stuck on the interior side of the ‘C’ channel using PVC
solvent cement adhesive etc. complete as per direction
of Engineer-in-charge, manufacturer’s specification &
drawings
472 TBSC-L.III-06 Providing and fixing door & shutter of which frame
made from 1.2 mm powder coated cold rolled steel
profiles of overall section size of 60 mm x 45 mm with
21 mm rebate for shutter with necessary stiffeners
hinges and screws with Cement bonded Particle BOARD
(IS 14862) shutter with all-round style “U” lipping of
size 15 x 18 x 15 mm made from 0.8 mm thick CRCA
powder coated steel profile with 16 mm thick Cement
bonded Particle board with necessary screws fixed at
every 1’-0” interval 250 mm long Aldrops 2 nos. M.S.
nickel coated 250 mm long 1 no. M.S. Tower Bolts
including cost and conveyance, one coat of primer, 2
coats of luppum and 2 coats of synthetic enamel paint as
per approved colour, labour charges etc.

473 TBSC-L.III-07 Doors Frames (Colour Coated Steel Sections) & Shutter
using Cement Bonded Particle Board as per IS 14276
(Cement Bonded Particle Board conforming to IS
14276): Providing and fixing of door frame made from
cold roll formed sections made of galvanized (Base steel
as per IS277 with zinc of 120 Gms/sqm) colour coated
steel sections with total coated thickness of 1mm,
primer coated with epoxy primer coat of 5-7 microns
thick, finish paint with polyester paint of 12-16 microns.
The Section for door frame is to be filled with
polyurethane (P.U) form of 40kg/m3. Overall size of
frame section should be of 50mm x 50mm. With
necessary corner brackets, stiffeners, hinges, and
screws. Cement Bonded particle board shutter (Cement
Bonded Particle Board conforming to IS 14276) “Single
Leaf” with all round styles “U” section of size 12m x 18m
x 12mm made from 0.6 mm thick galvanized, colour
coated cold rolled steel profiles with 16mm thick
Cement Bonded particle Board (Cement Bonded Particle
Board conforming to IS 14276) with necessary screws
fixed at every 1’-0” (304.8mm) intervals. The cost
inclusive of MS nickel coated Aldrop of size 250mm long
2nos. 200mm long tower bolt 1no., 125mm handles
2nos., cost and conveyance of all materials at site and
applying one coat primer , one coat of luppum and two
coats of synthetic enamel paint as per approved design
for finished item of work

474 TBSC-L.III-08 Providing, supplying & fixing of glazed 2 Track -2 Panel


Sliding Door made out of multi chambered uPVC
sections with TPV gaskets having isolated drainage and
reinforced with Galvanized Iron profiles throughout the
window. The sliding outer frame having a overall size of
60 x 45 mm with reinforcement of 1 mm thickness,
super sash with overall size of 39 x 75 mm with
reinforcement of 1.5 mm thickness. Glazing bead for
fixing of glass shall be of size 20 x 18mm and coextruded
with gasket. Fiber Glass mesh shall be provided in mesh
shutter. Window/Door shall be provided with 6 mm
plain float glass, standard hardware & multi point
locking system of Patio espagnolette. Wall thickness of
frame & sash shall be 2.0 mm
475 TBSC-L.III-09 Supplying and fixing of Unplasticised Poly Vinyl
Chloride (UPVC) sliding doors three track - only two
glass shutters sliding - 95 -Series duly manufactured
using UPVC reinforced profiles of 95.50 mm x 60 mm x
2.25 mm for outer frames, 66 mm x 42 mm x 2.25 mm
for sliding door shutter frames capable of mounting
single glazing system, structurally reinforced with hot
dip galvanized up to 50 microns of minimum thickness
of 1.2 mm prefabricated & welded through fusion
welding the window sash shall be fitted with 5 mm thick
clear float glass of reputed make duly fixed with EPDM
weathering seal resistant accessories like clipping
locking system made of aluminium 1 No., per set of
sashes and the system is to be installed at the site using
anchor fasteners, silicon rubber sealant, easy glazing/
deglazing at site etc., including cost and conveyance of
all materials, accessories, labour charges for
transportation, erection at site with templates for
casement sizing complete for finished item of work

476 TBSC-L.III-10 Supplying and fixing of Unplasticised Poly Vinyl


Chloride (UPVC) sliding doors three track - two glass
shutters sliding and one mesh shutter sliding- 95 -Series
duly manufactured using UPVC reinforced profiles of
(108 mm x 45 mm)/(95.50 mm x 60 mm) x 2.0 mm for
outer frames, (75 mm x 39 mm)/(66 mm x 42 mm) x 2.0
mm for sliding door shutter frames capable of mounting
single glazing system, structurally reinforced with hot
dip galvanized up to 50 microns of minimum thickness
of 1.2 mm prefabricated & welded through fusion
welding the window sash shall be fitted with 5 mm thick
clear float glass of reputed make and mesh shutter shall
be made of (48.5 mm x 30 mm))/(50 mm x 26.5 mm) x
2.0 mm uPVC profile section and fitted with
nylon/polymer mesh and rollers/pulley duly fixed with
TPV Gaskets/ EPDM weathering seal resistant
accessories like clipping locking system made of
aluminium 1 No., per set of sashes and the system is to
be installed at the site using anchor fasteners, silicon
rubber sealant, easy glazing/ deglazing at site etc.,
including cost and conveyance of all materials,
accessories, labour charges for transportation, erection
at site with templates for casement sizing complete for
finished item of work
477 TBSC-L.III-11 Supplying and fixing of Unplasticised Poly Vinyl
Chloride (UPVC) sliding doors three track - three glass
shutters sliding - 112 -Series duly manufactured using
UPVC reinforced profiles of 112.0 mm x 60 mm x 2.25
mm for outer frames, 66 mm x 42 mm x 2.25 mm for
sliding door shutter frames capable of mounting single
glazing system, structurally reinforced with hot dip
galvanized up to 50 microns of minimum thickness of
1.2 mm prefabricated & welded through fusion welding
the window sash shall be fitted with 5 mm thick clear
float glass of reputed make and fixed with EPDM
weathering seal resistant accessories like clipping
locking system made of aluminium 1 No., per set of
sashes and the system is to be installed at the site using
anchor fasteners, silicon rubber sealant, easy glazing/
deglazing at site etc., including cost and conveyance of
all materials, accessories, labour charges for
transportation, erection at site with templates for
casement sizing complete for finished item of work

478 TBSC-L.III-12 Supplying and fixing of Unplasticised Poly Vinyl


Chloride (UPVC) openable doors with openable shutters
duly manufactured using UPVC reinforced profiles of 60
mm x 55 mm x 2.0 mm for outer frames, 70 mm x 60
mm x 2.25 mm for mullion sections as per the need and
102 mm x 60 mm x 2.0 mm for openable shutter frame
capable of mounting single glazing system structurally
reinforced with hot dip galvanized up to 50 microns of
minimum thickness of 1.2 mm prefabricated & welded
through fusion welding the window sash shall be fitted
with 5 mm thick clear float glass of reputed make duly
fixed with TPV Gaskets/ EPDM weathering seal resistant
and accessories for openable door - hinges of stainless
steel grade 304- 3 Nos., per shutter handle with mazak
alloy casting 1 No. per shutter, locking system suitably
concealed 1 No., with raiser wedges for smooth
operation and the system is to be installed at the site
using anchor fasteners, silicon rubber sealant, easy
glazing/ deglazing at site etc., including cost and
conveyance of all materials, accessories, labour charges
for transportation, erection at site with templates for
casement sizing complete for finished item of work

479 TBSC-L.III-13 Supplying and fixing door shutter, with shutter frame
and infill panel made from PVC material conforming to
IS: 10151-1982, the shutter frame made out of PVC
extruded sections having overall dimension of 47 mm x
33 mm with wall thickness of 1.2mm + 0.3mm with
usual process variation, the shutter frame with tapered
shape to provide better grip to the infill panel end to
drain out the water The Infill panel is made out of PVC
Sections having Overall Dimensions of 200 mm x 20 mm
with wall thickness of 1mm + 0.2mm, the shutter frames
mitre cut and joined at the corner, by providing
Polymeric “ L” type corners to take hardware & fixtures
fixed with 10-20mm counter sunk fully threaded
parallel shank steel screws, all the hardware locations
reinforced with special polymeric bars as per drawings,
stickers showing locations of different hardware pasted
on the shutter, the infill panels joined by tongue and
groove method.
480 TBSC-L.III-14 Supply and fixing of door shutters made of rigid PVC
extruded hollow section of 20mm X 200 mm with the
wall thickness of 1.0mm +/- 0.1mm equally divided into
4 no's with tongue and groove locking arrangements.
The shutter frame is made of 30mm X 79mm with the
wall thickness of 1.5mm +/-0.15mm section mitre-cut
and joined at 4 corners with 125mm X 225mm plastic
brackets. The shutter shall be horizontally reinforced
with 2 no's of 8mm PVC rods. Teak wood batons shall be
reinforced inside the door shutter during the fabrication
of the door shutter at those points wherever the
hardware is fixed onto the door shutter.

481 TBSC-L.III-15 Providing & fixing 30 mm thick solid panel PVC door
shutter consisting of frame made out of 19 gauge M.S
tube of 19 x 19 mm for stiles, top & bottom rail, with a
coat of primer of approved make. M.S. Frame covered
with 5 mm thick heat molded PVC “C” channel of size of
30 x 50 mm forming stiles, 5 mm thick 75 mm wide
PVC sheet for top, lock & bottom rail on either side 20
mm wide cross PVC sheet as gap insert for top & bottom
rail, paneling of 10mm(+/-)( 5mm+5mm)” thick PVC
sheet fitted in the M.S. frame welded /sealed to the
stiles, on either side joined together with solvent
cement adhesive etc., additional 5 mm thick PVC strip of
20 mm width stuck on the interior side of the C channel
using solvent cement, complete as per direction of
Engineer–in–charge, manufacturers specification.

482 TBSC-L.III-16 Supplying & fixing SINGLE PANEL 30 mm thick PVC


DOOR, door shutters with shutter frame and Infill panel
made from PVC material, the shutter frame made out of
PVC extruded sections having overall dimensions of 6
0mm x 30 mm with wall thickness of 1.3 mm ± 0.3 mm,
with the Infill panel made out of multi chambered
seamless hollow PVC extruded panel having overall
dimensions of 610 mm x 20 mm having wall thickness 1
mm ± 0.2 mm with the shutter frame meter cut and
joined at corners and all the hardware locations
reinforced with special polymeric bars as per drawing
including providing special PVC bracket on hinge side,
etc complete

483 TBSC-L.III-17 Providing & fixing internal prelaminated PVC door


frame of size 100 x 45 mm with a wall thickness of 5mm,
made of extruded 5 mm Prelam PVC foam sheet, mitred
cut at two corners and joined with two nos. of 150mm
long brackets of 15 x 15 mm MS square tube, two
vertical door profiles reinforced with 40 x 20 MS Tube
of 19 gauge throughout the frame and the door frame
fixed to the wall using 65/100mm long MS screws
through the frame by using PVC fasteners with a
minimum of 3 nos of screws provided for each vertical
member and two nos. for horizontal, etc complete as
per drawing and direction of Engineer in Charge
484 TBSC-L.III-18 Supply & Fixing of Powder Coated Mild Steel doors,
frames & shutters made of Skin pass galvanized Iron
sheet conforming to Base Steel as per IS 513 “D” Quality,
Galvanized as per IS 277 with Hot Zinc Coating of 120
grams / Sq.Mtr with powder coating of thickness 60-65
Microns, frame with 1.2mm thick Skin pass Galvanized
Iron sheet formed to single rebate profile of size 100
mm X 58 mm and filled with in-fill Polyurethane foam,
the Door Shutters are with 0.80 mm thick Skin pass
Galvanized Iron Sheet formed to provide a 46 mm thick
fully flush, double skin door shell with Lock Seam joints
at stile edges, fitted with in-fill of Honeycomb Kraft
Paper and coated with polyester powders of Pure
polyester/ epoxy polyester or polyurethane powder for
powder coating of thickness 60 – 65 microns and are
coated with Zinc Phosphate Primer to receive any paint
on site or finished with Thermosetting Polyurethane
paint of Aliphatic Grade providing high levels of scratch
resistance and durability, the Shutter provided with 6
MM clear float vision glass in Circular, Square or
Rectangular shapes, Stainless Steel Ball Bearing Butt
Hinges 3 mm thick fixed flush to the frame and shutter
(Profile 102x76x3mm thick).Mortise Sash Lock with
Lever Handles, Mortise Dead Bolt, etc for industrial,
commercial, residential, clean room applications

485 TBSC-L.III-19 Providing & Fixing of Scientific Doors with metal door
frames and door shutters made of galvanize steel (base
steel as per IS 513 of 0.58 mm thick D quality,
galvanized as per IS 277 with Zinc of 120 GSM)coated
with Zinc Phosphate Primer to receive any paint on site
or finished with Thermosetting Polyurethane paint of
Aliphatic Grade providing high levels of scratch
resistance and durability/Epoxy polyester powder for
powder coating paint thickness 50-60 microns (Dry film
thickness) outer frame section of 100 x 58 mm x 1.2 mm
thick, shutter section of 0.80 mm thick galvanized steel
sheet pressed (roll formed) for 46mm thick fully flush,
double skin door shell seam joints at stile edges, in-fill of
honeycomb kraft paper used to give the required
rigidity and effective acoustic insulation with 6” Tower
bolt – 1 No., 6” D handles – 2 Nos., 10” Aldrop – 1 No.,
Butt Hinges – 3 Nos, Mortise Lock of approved quality –
1 No, frames fixed to the concrete/masonry wall by
means of self expanding screws complete for finished
item of work for Single leaf Door
486 TBSC-L.III-20 Providing & Fixing of Scientific Doors with metal door
frames and door shutters made of galvanize steel (base
steel as per IS 513 of 0.58 mm thick D quality,
galvanized as per IS 277 with Zinc of 120 GSM). coated
with Zinc Phosphate Primer to receive any paint on site
or finished with Thermosetting Polyurethane paint of
Aliphatic Grade providing high levels of scratch
resistance and durability/Epoxy polyester powder for
powder coating paint thickness 50-60 microns (Dry film
thickness) outer frame section of 100 x 58 mm x 1.2 mm
thick, shutter section of 0.80 mm thick galvanized steel
sheet pressed (roll formed) for 46mm thick fully flush,
double skin door shell seam joints at stile edges, in-fill of
honeycomb kraft paper used to give the required
rigidity and effective acoustic insulation with 6” Tower
bolt – 2 Nos., 6” D handles – 2 Nos., 10” Aldrop – 1 No.,
Butt Hinges – 6 Nos, Mortise Lock of approved quality –
1 No, frames fixed to the concrete/masonry wall by
means of self expanding screws complete for finished
item of work for Double leaf Door

487 TBSC-L.III-21 Supply & Fixing of Stainless steel doors, frames &
shutters made of stainless steel grade 304 of hairline
finish, frame with 1.2mm thick formed to single rebate
profile of size 100 mm X 58 mm and filled with in-fill
Polyurethane foam, the Door Shutters are with 0.80 mm
thick Stainless steel Sheet formed to provide a 46 mm
thick fully flush, double skin door shell with Lock Seam
joints at stile edges, fitted with in-fill of Honeycomb
Kraft Paper, the Shutter provided with 6 MM clear float
vision glass in Circular, Square or Rectangular shapes,
Stainless Steel Ball Bearing Butt Hinges 3 mm thick fixed
flush to the frame and shutter (Profile 102x76x3mm
thick).Mortise Sash Lock with Lever Handles, Mortise
Dead Bolt, etc for industrial, commercial, residential,
clean room applications
488 TBSC-L.III-22 Supply & Fixing of Powder Coated Fire Rated doors,
frames & shutters made of Skin pass galvanized Iron
sheet conforming to Base Steel as per IS 513 “D” Quality,
Galvanized as per IS 277 with Hot Zinc Coating of 120
grams / Sq.Mtr with powder coating of thickness 60-65
Microns, frame with 1.2mm thick Skin pass Galvanized
Iron sheet formed to double rebate profile of size 143
mm X 58 mm with maximum bending radius of 1.4 mm
and filled with in-fill Polyurethane foam, the Door
Shutters are with 0.80 mm thick Skin pass Galvanized
Iron Sheet formed to provide a 46 mm thick fully flush,
double skin door shell with Lock Seam joints at stile
edges, fitted with in-fill of Honeycomb Kraft Paper and
coated with polyester powders of Pure polyester/
epoxy polyester or polyurethane powder for powder
coating of thickness 60 – 65 microns and are coated
with Zinc Phosphate Primer to receive any paint on site
or finished with Thermosetting Polyurethane paint of
Aliphatic Grade providing high levels of scratch
resistance and durability, the Shutter provided with 6
MM clear float vision glass in Circular, Square or
Rectangular shapes, Stainless Steel Ball Bearing Butt
Hinges 3 mm thick fixed flush to the frame and shutter
(Profile 102x76x3mm thick).Mortise Sash Lock with
Lever Handles, Mortise Dead Bolt, etc for 120 minutes
Fire Rated door conforming to IS:3614 (Part2) 1992

489 TBSC-L.III-23 Supply & Fixing of Powder Coated Fire Rated doors,
frames & shutters made of Skin pass galvanized Iron
sheet conforming to Base Steel as per IS 513 “D” Quality,
Galvanized as per IS 277 with Hot Zinc Coating of 120
grams / Sq.Mtr with powder coating of thickness 60-65
Microns, frame with 1.2mm thick Skin pass Galvanized
Iron sheet formed to double rebate profile of size 143
mm X 58 mm with maximum bending radius of 1.4 mm
and filled with in-fill Polyurethane foam, the Door
Shutters are with 0.80 mm thick Skin pass Galvanized
Iron Sheet formed to provide a 46 mm thick fully flush,
double skin door shell with Lock Seam joints at stile
edges, fitted with in-fill of Honeycomb Kraft Paper and
coated with polyester powders of Pure polyester/
epoxy polyester or polyurethane powder for powder
coating of thickness 60 – 65 microns and are coated
with Zinc Phosphate Primer to receive any paint on site
or finished with Thermosetting Polyurethane paint of
Aliphatic Grade providing high levels of scratch
resistance and durability, the Shutter provided with 6
MM clear float vision glass in Circular, Square or
Rectangular shapes, Stainless Steel Ball Bearing Butt
Hinges 3 mm thick fixed flush to the frame and shutter
(Profile 102x76x3mm thick).Mortise Sash Lock with
Lever Handles, Mortise Dead Bolt, etc for 60 minutes
Fire Rated door conforming to IS:3614 (Part2) 1992
490 TBSC-L.III-23 Supply & Fixing of Stainless steel Fire Rated doors, frames & shutters made of
Stainless steel of 304 grade hairline finish, frame with 1.2mm thick Stainless steel of
304 grade hairline finish sheet formed to double rebate profile of size 143 mm X 58
mm with maximum bending radius of 1.4 mm and filled with in-fill Polyurethane
foam, the Door Shutters are with 0.80mm thick Stainless steel of 304 grade hairline
finish Sheet formed to provide a 46 mm thick fully flush, double skin door shell
with Lock Seam joints at stile edges, fitted with in- fill of Honeycomb Kraft Paper and
coated with polyester powders of Pure polyester/ epoxy polyester or polyurethane
powder for powder coating of thickness 60 – 65 microns and are coated with
Zinc Phosphate Primer to receive any paint on site or finished with Thermosetting
Polyurethane paint of Aliphatic Grade providing high levels of scratch resistance
and durability, the Shutter provided with 6 MM clear float vision glass in
Circular, Square or Rectangular shapes, Stainless Steel Ball Bearing Butt Hinges 3
mm thick fixed flush to the frame and shutter (Profile 102 x 76 x 3mm
thick).Mortise Sash Lock with Lever Handles, Mortise Dead Bolt, etc for 120
491 TBSC-L.III-24 Supply & Fixing of Stainless steel Fire Rated doors,
frames & shutters made of Stainless steel of 304 grade
hairline finish, frame with 1.2mm thick Stainless steel of
304 grade hairline finish sheet formed to double rebate
profile of size 143 mm X 58 mm with maximum bending
radius of 1.4 mm and filled with in-fill Polyurethane
foam, the Door Shutters are with 0.80 mm thick
Stainless steel of 304 grade hairline finish Sheet formed
to provide a 46 mm thick fully flush, double skin door
shell with Lock Seam joints at stile edges, fitted with in-
fill of Honeycomb Kraft Paper and coated with polyester
powders of Pure polyester/ epoxy polyester or
polyurethane powder for powder coating of thickness
60 – 65 microns and are coated with Zinc Phosphate
Primer to receive any paint on site or finished with
Thermosetting Polyurethane paint of Aliphatic Grade
providing high levels of scratch resistance and
durability, the Shutter provided with 6 MM clear float
vision glass in Circular, Square or Rectangular shapes,
Stainless Steel Ball Bearing Butt Hinges 3 mm thick fixed
flush to the frame and shutter (Profile 102x76x3mm
thick).Mortise Sash Lock with Lever Handles, Mortise
Dead Bolt, etc for 60 minutes Fire Rated door
conforming to IS:3614 (Part2) 1992
492 TBSC-L.III-25 Supply & Fixing of Lead Lined Clean room doors frames
and shutters made of Skin pass galvanized Iron sheet
(Conform to Base Steel as per IS 513 “D” Quality,
Galvanized as per IS 277 with Hot Zinc Coating of 120
grams / Sq.Mtr).with powder coating of thickness 60-65
Microns, frame of 1.60mm thick galvanized steel sheet
(Conform to IS 277) formed to Single/double rebate
profile of size 100mm X 58mm/ 143x58mm, door
frames with a single / multi Layer of Lead sheet varying
thickness from 3mm /1mm to 2mm depends on
radiation level, the shutter with 1.2 mm thick
Galvanized Steel Sheet (Conform to IS 277) formed to
provide a 46mm thick fully flush, double skin door shell
with Lock Seam joints at stile edges with a single / multi
Layer of Lead sheet varying thickness from 3mm /1mm
to 2mm depends on radiation level, the lead sheets
extend the full width and height of the door, Lead
thickness is equal to the shielding in the adjacent wall,
the door frames and door shutters are coated with
polyester powders of Pure polyester/ epoxy polyester
or polyurethane powder for powder coating of
thickness 60 – 65 microns, coated with Zinc Phosphate
Primer to receive any paint on site or finished with
Thermosetting Polyurethane paint of Aliphatic Grade
providing high levels of scratch resistance and
durability, hardware with Stainless Steel Ball Bearing
Butt Hinges 3 mm thick fixed flush to the frame and
shutter etc complete for finished item

493 TBSC-L.III-26 Supply & Fixing of Lead Lined Stainless steel Clean room
door frames and shutters made of Stainless steel grade
of 304 hairline finish, frame with 1.60mm (16SWG)
thick hairline finish Stainless steel grade of 304 formed
to Single/double rebate profile of size 100 mm x 58mm/
143 x 58 mm, door frames with a single / multi Layer of
Lead sheet varying thickness from 3mm /1mm to 2mm
depends on radiation level, the shutter with 1.2 mm
thick hairline finish Stainless steel grade of 304 formed
to provide a 46mm thick fully flush, double skin door
shell with Lock Seam joints at stile edges with a single /
multi Layer of Lead sheet varying thickness from 3mm
/1mm to 2mm depends on radiation level. The lead
sheets extend the full width and height of the door. Lead
thickness is to be equal to the shielding in the adjacent
wall. Hardware can be provided with Stainless Steel Ball
Bearing Butt Hinges 3 mm thick fixed flush to the frame
and shutter etc complete for finished item of work
494 TBSC-L.III-27 Providing of Factory made prelaminated FPVC (Foamed Polyvinyl Chloride)
Door frame of the size 105x40mm with a wall thickness of 10mm made out of
extruded rigid FPVC profile mitre joined with 6 Nos. of 50mm long screw. The
door frame shall be fixed to the wall by using 80mm long screws through the frame
with the help of PVC fasteners of 3 no's to be provided for each vertical member, GI
stiffeners of ("U" channel of size 29x9x1mm, 150mm long) -3 no's at hinge point,
Frame reinforcement of("U" GI channel of size 46x22x.06mm),Bottom tie rod of
("U" GI channel size of 15x15x1mm) etc. complete as per manufacturers
specification for finished item of work. Maximum door frame size : 980
x 2070 including providing of 35mm thick Factory made Prelaminated ABS
(Acrolynitrile Butadyne Styrene) Door shutter moulded in different designs,
consisting of all round Frame made out of water proof solid foam PVC bar of
size 20x32mm, reinforced by 32x 32mm - 2 nos. for vertical made out of
LVL (Laminated Veneer Lumber), core material of 32 mm thick high density craft
paper honey comb board, sandwiched on both sides with prelaminated ABS
sheet thickness of 1.5mm . PVC edge banding of size 0.45mm on the vertical
495 TBSC-L.III-28 Providing of Factory made prelaminated FPVC (Foamed Polyvinyl Chloride) Door
frame of the size105x40mm with a wall thickness of 10mm made outof extruded rigid
FPVC profile mitre joined with 6 Nos. of 50mm long screw. The door frame shall
befixed to the wall by using 80mm long screws through the frame with the help of PVC
fasteners of 3 no's to be provided for each vertical member, GI stiffeners of ("U"
channel of size 29x9x1mm, 150mm long) -3 no's at hinge point, Frame reinforcement
of("U" GI channel of size 46x22x.06mm),Bottom tie rod of ("U"GI channel size of
15x15x1mm) etc. complete as per manufacturers specification for finished item of
work. Maximum door frame size : 980 x 2070 including providing of 35mm thick
Factory made Prelaminated ABS (Acrolynitrile Butadyne Styrene) Door shutter
moulded in different designs, consisting of all round Frame made out of water proof
solid foam PVC bar of size 20x32mm, reinforced by 32x 32mm - 2 nos. for vertical
made out of LVL (Laminated Veneer Lumber), core material of 32 mm thick high
density craft paper honey comb board, sandwiched on both sides with prelaminated
ABS sheet thickness of 1.5mm . PVC edge banding of size 0.45mm on the vertical
sides. Hardware made out of steel coated butterfly hinges - 3 Nos. for each shutter
and ISI make S.S round lock completes for finished item of work. Maximum shutter
496 TBSC-L.III-29 size of : 910 xand
Supplying 2030fixing
mm of Unplasticised Poly Vinyl Chloride (UPVC) sliding
doors three track - three glass shutters sliding duly manufactured using UPVC
reinforced profiles of 108.0 mm x 49 mm x 2.25 mm for outer frames, 85 mm x
41 mm x 2.25 mm for sliding door shutter frames capable of mounting
single glazing system, structurally reinforced with reinforced with 35mm x 10mm
x 1.5mm thick with hot dip galvanized up to 50 microns of minimum thickness
of 1.2 mm prefabricated & welded through fusion welding the window sash shall be
fitted with 5 mm thick clear float glass of reputed make and fixed with with uPVC
glazing bead of 22.5mm x 18mm with “C” or “R” type inner and outer
EPDM weathering seal resistant accessories like clipping locking system made
of aluminium 1 No., per set of sashes and the system is to be installed at the
site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at
site etc., including cost and conveyance of all materials, accessories,
labour charges for transportation, erection at site with templates for
casement sizing complete for finished item of work

IV SUB-SECTION CUP-BOARD DOORS


494 TBSC-L.IV-01 Supply and fixing of cupboard frames and shutters and
using 16mm Cement Bonded Particle Board conforming
to IS 14276 duly painted both sides with one coat of
primer and two coats of synthetic / enamel paint of
approved shade and brand including fixing of hardware
like M.S. powder coated Piano hinges of size 18mm x
18mm, brass ball catches, Aluminum tower bolts and
handles , Godrej locks, synthetic glue, screws and nails
including cost and conveyance of all materials, labor
charges, all incidental and operational charges etc.,
complete for finished item of work at site as per the
directions of Engineer in Charge.
495 TBSC-L.IV-02 Supply and fixing of box type cupboard using Cement
Bonded Particle Board conforming to IS 14276 for
making frame of size 100mm x 35mm using two
sandwiched 16MM boards, one Cement Bonded Particle
Board conforming to IS 14276 and one Cement Bonded
Prelaminated Particle Board with plain 35mm wood
lipping. The Shutters are made of 16MM thick Cement
Bonded Prelaminated Particle Board (Pre-Laminated
Cement Bonded Particle Board) of approved shade
inclusive of hardware like M.S. powder coated Piano
hinges of size ¾” x ¾” , Aluminum powder coated
handles of size 4” (101.6mm), Aluminum tower bolt 4”
(101.6mm) Godrej locks, screws, wood lipping and
synthetic glue etc., complete finish item of work.

496 TBSC-L.IV-03 Supply and fixing of PVC cupboards for kitchen and
bedrooms shall be made out of multi chambered PVC
sections having overall dimensions of 20 X 762mm with
a wall thickness of 1.2mm ± 0.3mm. The cabinets shall
be made as per the requirements of the room with
groove system. The PVC section surface shall be plain
and laminated finish to have good look, completed, for finished item of work for
PVC CABINETS

TBSC-L.IV-04 Supply and fixing of cupboard shutter using teakwood scantling of size 50 mm x 50
mm teakwood as outer frame and 50 mm x 30 mm of size teakwood for shutter
frames, 8mm thick Bison Lam as panel to each shutter consist of 2 Nos 75mm long
tower bolt –2 nos 75 mm big handle the and other shutter will have 1 no of cupboard
lack , 1 No of 75 mm long handle and 75 mm x 10mm x 1mm thick SS hinges- 2 Nos
for each shutter. The above frame will be fixed to the wall with screws, the rate
inclusive of screws,handle, etc., complete at site of work

M SECTION WINDOWS
(Landing cost - including cost of conveyance, loading & unloading)
I SUB-SECTION OPENABLE WINDOWS
497 TBSC-M.I-01 Supply and fixing of pre-painted steel casement/ openable windows base steel as
per IS 513 of - 0.58 mm thick 'D quality, galvanized as per IS 277, finish painted
with a polyester paint, section for outer frame of 46 x 52 mm section for shutter of
46 x 46 mm section for mullion 46 x 70 mm, and section for beading 18 x 25mm
panelled with 5mm thick plain float glass fitted with EPDM gaskets,handle made of
high grade aluminium powder coated frames fixed to the concrete / masonry wall
by means of self expanding screws including 10 mm square guard bars @ 150 mm
pitch for Windows: Double shutter for sizes 2'0 x 4'0 (609.6 x1219.2 mm ) 3'-0
x 4'-0 (914.4mm x 1219.2 mm) without mullion section

498 TBSC-M.I-02 Supply and fixing of pre-painted steel casement/ openable windows base steel as
per IS 513 of - 0.58 mm thick 'D quality, galvanized as per IS 277, finish painted
with a polyester paint, section for outer frame of 46 x 52 mm section for shutter of
46 x 46 mm section for mullion 46 x 70mm, and section for beading 18 x
25 mm panelled with 5 mm thick plain float glass fitted with EPDM gaskets,
handle made of high grade aluminium powder coated frames fixed to the
concrete /masonry wall by means of self expanding screws including 10
mm square guard bars @ 150 mm pitch for Windows: Double shutter with mullion
section for sizes 3'-0 x 4'-0 (914.4mm x 1219.2 mm) and 4'-0 x 4 '-0
(1219.2x1219.2mm)
499 TBSC-M.I-03 Supply and fixing of pre-painted steel casement/ openable windows base steel as
per IS 513 of - 0.58 m thick 'D quality, galvanized as per IS 277, finis painted with
a polyester paint, section for outer frame of 46 x 52mm section for shutter of 46 x 46
mm section for mullion 46 x 70 mm, and section for beading 18 x 25 mm panelled
with 5 mm thick plain float glass fitted with EPDM gaskets, handle made of high
grade aluminium powder coated frames fixed to the concrete /masonry wall by
means of self expanding screws including 10 mm square guard bars @ 150 mm
pitch for Windows: Double shutter 4'-0 x 4 '-0 (1219.2x12.19.2mm) without Mullion
section

500 TBSC-M.I-04 Supply and fixing of pre-painted steel casement/


openable windows base steel as per IS 513 of - 0.58 mm
thick 'D quality, galvanized as per IS 277, finish painted
with a polyester paint, section for outer frame of 46 x 52
mm section for shutter of 46 x 46 mm section for
mullion 46 x 70 mm, and section for beading 18 x 25
mm panelled with 5 mm thick plain float glass fitted
with EPDM gaskets, handle made of high grade
aluminium powder coated frames fixed to the concrete
/masonry wall by means of self expanding screws
including 10 mm square guard bars @ 150 mm pitch for
Windows: Double shutter with Mullion section for sizes
4'-6 x 4 '-6 (1371.6x1371.6mm) 5'-0 x 4'-0
(1524x1219.2mm) and 6'-0 x 4'-0 (1828.8x1219.2mm)
and 6'-0 x 4'-6 (1828.8x1371.6mm)

501 TBSC-M.I-05 Providing and fixing of Casement/ Openable Windows


made of pre-painted steel as per IS 513 of 0.58 mm thick
galvanized as per IS 277, finish painted with a polyester
paint and section for outer frame of 48 x 50 mm, centre
mullion of 48 x 50 mm, section for shutter of 48 x 25
mm and the fixed glass beading section should be 12 x
12 mm and the outer frame and mullions to have rebate
for glazed shutter with a 20 mm provision for guard
bars/grills, handle, stay, 2 nos. of stainless steel heavy
duty pivot hinges provided per shutter and windows
fitted with 5 mm thick plain float glass with rubber
gaskets including fixing the frames in concrete/masonry
wall by means of self expanding screws, Including
10mm Square guard bars with 6” (152.4mm) pitch etc.,
complete Single shutter Window without vertical
mullion for size 2’0”x4’0” (609.6mm x 1219.2mm)

502 TBSC-M.I-06 Providing and fixing of Casement/ Openable Windows


made of pre-painted steel as per IS 513 of 0.58 mm thick
galvanized as per IS 277, finish painted with a polyester
paint and section for outer frame of 48 x 50 mm, centre
mullion of 48 x 50 mm, section for shutter of 48 x 25
mm and the fixed glass beading section should be 12 x
12 mm and the outer frame and mullions to have rebate
for glazed shutter with a 20 mm provision for guard
bars/grills, handle, stay, 2 nos. of stainless steel heavy
duty pivot hinges provided per shutter and windows
fitted with 5 mm thick plain float glass with rubber
gaskets including fixing the frames in concrete/masonry
wall by means of self expanding screws, Including
10mm Square guard bars with 6” (152.4mm) pitch etc.,
complete Double shutter Window with vertical mullion
for sizes 3’0” x 4’0” ( 914.4mm x 1219.2mm) and 4’0” x
4’0” (1219.2mm x 1219.2mm)
503 TBSC-M.I-07 Providing and fixing of Casement/ Openable Windows
made of pre-painted steel as per IS 513 of 0.58 mm thick
galvanized as per IS 277, finish painted with a polyester
paint and section for outer frame of 48 x 50 mm, centre
mullion of 48 x 50 mm, section for shutter of 48 x 25
mm and the fixed glass beading section should be 12 x
12 mm and the outer frame and mullions to have rebate
for glazed shutter with a 20 mm provision for guard
bars/grills, handle, stay, 2 nos. of stainless steel heavy
duty pivot hinges provided per shutter and windows
fitted with 5 mm thick plain float glass with rubber
gaskets including fixing the frames in concrete/masonry
wall by means of self expanding screws, Including
10mm Square guard bars with 6” (152.4mm) pitch etc.,
complete Centre fixed both side openable shutter
window for sizes 5’0”x4’0” (1524mm x1219.2mm) and
6’0”x4’0” (1828.8mm x1219.2mm)

504 TBSC-M.I-08 Providing & Fixing of Openable Windows with Fly-mesh


made of pre-painted steel as per IS 513 of 0.58 mm thick
galvanized as per IS 277 finish painted with a polyester
paint and the section for outer frame of 72 x 55mm,
centre mullion of 72 x 50mm, section for fixed glass
beading section of 12 x 12 mm and section for shutters
of 48 x 25 mm and outer frame & mullion sections with
rebate for glazed shutters, fly mesh and a 20 mm
provision for guard bars/grills and fly mesh shutter
section of 20 x 40 mm, stay, handles, latch 2 Nos of
heavy duty stainless steel pivot hinges per shutter and
panelled with 5mm thick plain float glass and S.S. Mesh
for fly mesh shutter (304 grade), fitted using rubber
gaskets including fixing the windows in the concrete /masonry wall by means of
self expanding screws, including 10mm Square guard bars with 6”
(152.4mm) pitch , complete for Single shutter Window 2’0”x4’0” (609.6mm x
1219.2mm)

505 TBSC-M.I-09 Providing & Fixing of Openable Windows with Fly-mesh


made of pre-painted steel as per IS 513 of 0.58 mm thick
galvanized as per IS 277 finish painted with a polyester
paint and the section for outer frame of 72 x 55mm,
centre mullion of 72 x 50mm, section for fixed glass
beading section of 12 x 12 mm and section for shutters
of 48 x 25 mm and outer frame & mullion sections with
rebate for glazed shutters, fly mesh and a 20 mm
provision for guard bars/grills and fly mesh shutter
section of 20 x 40 mm, stay, handles, latch 2 Nos of
heavy duty stainless steel pivot hinges per shutter and
panelled with 5mm thick plain float glass and S.S. Mesh
for fly mesh shutter (304 grade), fitted using rubber
gaskets including fixing the windows in the
concrete/masonry wall by means of self expanding
screws, including 10mm Square guard bars with 6”
(152.4mm) pitch , complete for Double shutter Window
with vertical mullion of sizes 3’0” x 4’0” ( 914.4mm x
1219.2mm) and 4’0” x 4’0” (1219.2mm x 1219.2mm)
506 TBSC-M.I-10 Providing & Fixing of Openable Windows with Fly-mesh
made of pre-painted steel as per IS 513 of 0.58 mm thick
galvanized as per IS 277 finish painted with a polyester
paint and the section for outer frame of 72 x 55mm,
centre mullion of 72 x 50mm, section for fixed glass
beading section of 12 x 12 mm and section for shutters
of 48 x 25 mm and outer frame & mullion sections with
rebate for glazed shutters, fly mesh and a 20 mm
provision for guard bars/grills and fly mesh shutter
section of 20 x 40 mm, stay, handles, latch 2 Nos of
heavy duty stainless steel pivot hinges per shutter and
panelled with 5mm thick plain float glass and S.S. Mesh
for fly mesh shutter (304 grade), fitted using rubber
gaskets including fixing the windows in the
concrete/masonry wall by means of self expanding
screws, including 10mm Square guard bars with 6”
(152.4mm) pitch , complete for Centre fixed both side
openable shutter window for a size 5’0”x4’0” (1524mm
x1219.2mm).

507 TBSC-M.I-11 Providing & Fixing of Openable Windows with Fly-mesh made of pre-painted steel as
per IS 513 of 0.58 mm thick galvanized as per IS 277 finish painted with a polyester
paint and the section for outer frame of 72 x 55mm, centre mullion of 72 x
50mm, section for fixed glass beading section of 12 x 12 mm and section for
shutters of 48 x 25 mm and outer frame & mullion sections with rebate for glazed
shutters, fly mesh and a 20 mm provision for guard bars/grills and fly mesh
shutter section of 20 x 40 mm, stay, handles, latch 2 Nos of heavy duty
stainless steel pivot hinges per shutter and panelled with 5mm thick plain float
glass and S.S. Mesh for fly mesh shutter (304 grade), fitted using rubber
gaskets including fixing the windows in the concrete /masonry wall by means of
self expanding screws, including 10mm Square guard bars with 6” (152.4mm)
pitch , complete for a size 6’0”x4’0” (1828.8mm x1219.2mm)

508 TBSC-M.I-12 Providing & Fixing of Mesh windows made of pre-


painted steel (Base Steel as per IS 513 of 0.58mm thick
galvanized as per IS 277 primer coated with epoxy
primer finish painted with a polyester paint, section for
outer frame of 47 x 36 mm, centre mullion of 60 x 36
mm, section mesh beading 18 x 6 mm and Fly mesh
shutter section of 20 x 40 mm, the sections cut to length
meter joined with corner bracket and centre mullions
fixed with mullion cap, handles, latch, 2 Nos of heavy
duty stainless steel pivot hinges per S.S. Mesh for fly
mesh shutter (304 grade) including fixing the frames in
the concrete/masonry wall by means of self expanding
screws complete for finished item of work.
509 TBSC-M.I-13 Providing and fixing of Openable / Casement Windows
made of pre-painted steel as per IS 513 of 0.80 mm thick
galvanized as per IS 277 finish painted with a polyester
paint and section for outer frame of 80 x 45 mm, centre
mullion of 80 x 60 mm, section for shutter of 52 x 25
mm x 0.6 mm thick, outer frame and mullions to have
rebate for glazed shutter with a provision for guard
bars/grills, centre mullion fixed with mullion cap, 1 No.
of High grade nylon latch handle, window stopper, 2
nos. of with MS Powder coated /SS ball bearing butt
Hinges provided per shutter and windows fitted with 4
mm thick plain float glass with rubber gaskets including
fixing the frames in concrete/masonry wall by means of
self expanding screws, Including 10 mm Square guard
bars with 6” (152.4mm) pitch etc., complete for Single
openable shutter window size of 2’ 0” x 4’ 0” (609.6 x
1219.2mm)

510 TBSC-M.I-14 Providing and fixing of Openable / Casement Windows


made of pre-painted steel as per IS 513 of 0.80 mm thick
galvanized as per IS 277 finish painted with a polyester
paint and section for outer frame of 80 x 45 mm, centre
mullion of 80 x 60 mm, section for shutter of 52 x 25
mm x 0.6 mm thick, outer frame and mullions to have
rebate for glazed shutter with a provision for guard
bars/grills, centre mullion fixed with mullion cap, 1 No.
of High grade nylon latch handle, window stopper, 2
nos. of with MS Powder coated /SS ball bearing butt
Hinges provided per shutter and windows fitted with 4
mm thick plain float glass with rubber gaskets including
fixing the frames in concrete/masonry wall by means of
self expanding screws, Including 10 mm Square guard
bars with 6” (152.4mm) pitch etc., complete for Double
openable shutter window Size of 3’ 0” x 4’ 0” (914.4mm
x 1219.2mm) and 4’0” x 4’0” (1219.2mm x 1219.2mm)

511 TBSC-M.I-15 Providing and fixing of Openable / Casement Windows


made of pre-painted steel as per IS 513 of 0.80 mm thick
galvanized as per IS 277 finish painted with a polyester
paint and section for outer frame of 80 x 45 mm, centre
mullion of 80 x 60 mm, section for shutter of 52 x 25
mm x 0.6 mm thick, outer frame and mullions to have
rebate for glazed shutter with a provision for guard
bars/grills, centre mullion fixed with mullion cap, 1 No.
of High grade nylon latch handle, window stopper, 2
nos. of with MS Powder coated /SS ball bearing butt
Hinges provided per shutter and windows fitted with 4
mm thick plain float glass with rubber gaskets including
fixing the frames in concrete/masonry wall by means of
self expanding screws, Including 10 mm Square guard
bars with 6” (152.4mm) pitch etc., complete for 5’0 x
4’0 ( 1524 x 1219.2mm) and 6’0 x 4’0 (1829.6 x 1219.2mm)
512 TBSC-M.I-16 Providing and fixing of Openable / Casement Windows
with fly mesh made of pre-painted steel as per IS 513 of
0.80 mm thick galvanized as per IS 277, finish painted
with a polyester paint and section for outer frame of
100 x 45 mm, centre mullion of 100 x 60 mm, section for
shutter of 52 x 25 mm x 0.6 mm thick, section for fly-
shutter of 52 x 25 mm x 0.6 mm thick and fitted with
stainless steel 32 gauge fly mesh of 304 grade and
mullions to have double rebate for glazed shutter and
fly-shutter with a provision for guard bars/grills and the
sections, 1 No. of High grade nylon latch handle, window
stopper, 2 nos. of with MS Powder coated /SS ball
bearing butt Hinges provided per shutter and windows
fitted with 4 mm thick plain float glass with rubber
gaskets including fixing the frames in concrete/masonry
wall by means of self expanding screws, Including 10
mm Square guard bars with 6” (152.4mm) pitch etc.,
complete for 2’ 0” x 4’ 0” (609.6 x 1219.2mm)

513 TBSC-M.I-17 Providing and fixing of Openable / Casement Windows


with fly mesh made of pre-painted steel as per IS 513 of
0.80 mm thick galvanized as per IS 277, finish painted
with a polyester paint and section for outer frame of
100 x 45 mm, centre mullion of 100 x 60 mm, section for
shutter of 52 x 25 mm x 0.6 mm thick, section for fly-
shutter of 52 x 25 mm x 0.6 mm thick and fitted with
stainless steel 32 gauge fly mesh of 304 grade and
mullions to have double rebate for glazed shutter and
fly-shutter with a provision for guard bars/grills and the
sections, 1 No. of High grade nylon latch handle, window
stopper, 2 nos. of with MS Powder coated /SS ball
bearing butt Hinges provided per shutter and windows
fitted with 4 mm thick plain float glass with rubber
gaskets including fixing the frames in concrete/masonry
wall by means of self expanding screws, Including 10
mm Square guard bars with 6” (152.4mm) pitch etc.,
complete for 3’ 0” x 4’ 0” (914.4mm x 1219.2mm) and
4’0” x 4’0” (1219.2mm x 1219.2mm)

514 TBSC-M.I-18 Providing and fixing of Openable / Casement Windows


with fly mesh made of pre-painted steel as per IS 513 of
0.80 mm thick galvanized as per IS 277, finish painted
with a polyester paint and section for outer frame of
100 x 45 mm, centre mullion of 100 x 60 mm, section for
shutter of 52 x 25 mm x 0.6 mm thick, section for fly-
shutter of 52 x 25 mm x 0.6 mm thick and fitted with
stainless steel 32 gauge fly mesh of 304 grade and
mullions to have double rebate for glazed shutter and
fly-shutter with a provision for guard bars/grills and the
sections, 1 No. of High grade nylon latch handle, window
stopper, 2 nos. of with MS Powder coated /SS ball
bearing butt Hinges provided per shutter and windows
fitted with 4 mm thick plain float glass with rubber
gaskets including fixing the frames in concrete/masonry
wall by means of self expanding screws, Including 10
mm Square guard bars with 6” (152.4mm) pitch etc.,
complete for 5’0 x 4’0 ( 1524 x 1219.2mm) and 6’0 x4’0
( 1829.6 x 1219.2mm)
515 TBSC-M.I-19 Galvanized powder coated Casement Windows with
openable shutters duly manufactured using pressed
steel sections in mild steel conforming to IS 513 of
having 1.0 mm thick and galvanized as per IS 277 of 120
GSM surface treatment with pure polyester powder
coating of 30-40 microns thick and section for outer
frame of 60x50mm, centre for mullion of 62x50mm,
section for shutter of 52 x 22 mm, outer frame and
mullions to have one side rebate for glazed shutter of
size 24 mm and 10x10 mm square guard bars provided
at 125 mm c/c the sections assembled with bolt & nut
assembly with zinc-electroplated M-5 bolts, GI Handle of
size 80 mm x 15 mm -1 No per shutter, 2 nos of stainless
steel heavy duty pivot hinges of size 3 of SS 304 Grade
per shutter, window panes with 5 mm thick plain float
glass and fixed with glass beading section of 10x12 mm
size with 0.8 mm thick powder coated aluminium 'U'
channel and window frames fixing to the concrete /masonry wall arrangement
with self expanding screws, complete for finished item of work including of all
taxes - 1220 x 1372 or below size
516 TBSC-M.I-20 Galvanized powder coated Casement Windows with
openable shutters duly manufactured using pressed
steel sections in mild steel conforming to IS 513 of
having 1.0 mm thick and galvanized as per IS 277 of 120
GSM surface treatment with pure polyester powder
coating of 30-40 microns thick and section for outer
frame of 60x50mm, centre for mullion of 62x50mm,
section for shutter of 52 x 22 mm, outer frame and
mullions to have one side rebate for glazed shutter of
size 24 mm and 10x10 mm square guard bars provided
at 125 mm c/c the sections assembled with bolt & nut
assembly with zinc-electroplated M-5 bolts, GI Handle of
size 80 mm x 15 mm -1 No per shutter, 2 nos of stainless
steel heavy duty pivot hinges of size 3 of SS 304 Grade
per shutter, window panes with 5 mm thick plain float
glass and fixed with glass beading section of 10x12 mm
size with 0.8 mm thick powder coated aluminium 'U'
channel and window frames fixing to the
concrete/masonry wall arrangement with self
expanding screws, complete for finished item of work
including of all taxes - 1530 x 1372 or above size
517 TBSC-M.I-21 Galvanized powder coated Casement Windows with
openable shutters duly manufactured using pressed
steel sections in mild steel conforming to IS 513 of
having 1.0 mm thick and galvanized as per IS 277 of 120
GSM surface treatment with pure polyester powder
coating of 30-40 microns thick and section for outer
frame of 88x50mm, centre for mullion of 62x88 mm,
section for glass and fly-proof mesh shutter of 52 x 22
mm, outer frame and mullions to have two sides rebate
for glazed shutter of size 24 mm and 10x10 mm square
guard bars provided at 125 mm c/c the sections
assembled with bolt & nut assembly with zinc-
electroplated M-5 bolts, GI Handle of size 80 mm x 15
mm -1 No per shutter, 2 Nos of stainless steel heavy
duty pivot hinges of size 3 of SS 304 Grade per shutter,
window panes with 5 mm thick plain float glass and
fixed with glass beading section of 10x12 mm size with
0.8 mm thick powder coated aluminium 'U' channel and
fly-proof mesh of SS 304 grade fixed with 18 mm x 12
mm BT wood beading and window frames fixing
arrangement to the concrete/masonry wall with self
expanding screws, complete for finished item of work
including of all taxes - 1220 x 1372 or below size

518 TBSC-M.I-22 Galvanized powder coated Casement Windows with


openable shutters duly manufactured using pressed
steel sections in mild steel conforming to IS 513 of
having 1.0 mm thick and galvanized as per IS 277 of 120
GSM surface treatment with pure polyester powder
coating of 30-40 microns thick and section for outer
frame of 88x50mm, centre for mullion of 62x88 mm,
section for glass and fly-proof mesh shutter of 52 x 22
mm, outer frame and mullions to have two sides rebate
for glazed shutter of size 24 mm and 10x10 mm square
guard bars provided at 125 mm c/c the sections
assembled with bolt & nut assembly with zinc-
electroplated M-5 bolts, GI Handle of size 80 mm x 15
mm -1 No per shutter, 2 Nos of stainless steel heavy
duty pivot hinges of size 3 of SS 304 Grade per shutter,
window panes with 5 mm thick plain float glass and
fixed with glass beading section of 10x12 mm size with
0.8 mm thick powder coated aluminium 'U' channel and
fly-proof mesh of SS 304 grade fixed with 18 mm x 12
mm BT wood beading and window frames fixing
arrangement to the concrete/masonry wall with self
expanding screws, complete for finished item of work
including of all taxes - 1530 x 1372 or above size
519 TBSC-M.I-23 Supplying and fixing of Unplasticised Poly Vinyl
Chloride (UPVC) casement windows openable shutters
duly manufactured using UPVC reinforced profiles of
(48 mm x 60 mm)/ (58 mm x 60 mm) x 2.0 mm for
outer frames, (64 mm x 60 mm)/(72 mm x 60mm) x 2.0
mm for mullion sections for two or more openable
shutters and (78 mm x 60 mm)/(72 mm x 42 mm) x 2.0
mm for outward openable shutter frame or (70 mm x 60
mm)/ (72 mmx 42 mm) x 2.0 mm for inward openable
shutter frame capable of mounting single glazing system
structurally reinforced with hot dip galvanized up to 50
microns of minimum thickness of 1.2 mm prefabricated
& welded through fusion welding the window sash shall
be fitted with 5 mm thick clear float glass of reputed
make duly fixed with TPV Gaskets/ EPDM weathering
seal resistant accessories for casement window -
friction stay hinges of stainless steel grade 304- 2 Nos.,
per sash, handle with mazak alloy casting 1 No. per sash,
locking system suitably concealed 1 No., per sash
provided with raiser wedges for smooth operation and
the system is to be installed at the site using anchor
fasteners, silicon rubber sealant, easy glazing/
deglazing at site etc., including cost and conveyance of
all materials, accessories, labour charges for
transportation, erection at site with templates for
casement sizing complete for finished item of work

520 TBSC-M.I-24 Supplying and fixing of Unplasticised Poly Vinyl


Chloride (UPVC) casement windows openable shutters
duly manufactured using UPVC reinforced profiles of
(60 mm x 55 mm) / (60 mm x 58 mm) x 2.0 mm for
outer frames, (70 mm x 60 mm)/ (72 mmx 60 mm) x
2.0 mm for mullion sections for two or more openable
shutters (70 mm x 60 mm)/ (72 mm x 42 mm) x 2.0 mm
for openable shutter frame capable of mounting single
glazing system structurally reinforced with hot dip
galvanized up to 50 microns of minimum thickness of
1.2 mm prefabricated & welded through fusion welding
the window sash shall be fitted with 5 mm thick clear
float glass of reputed make duly fixed with TPV Gaskets/
EPDM weathering seal resistant and accessories for
casement window - friction stay hinges of stainless steel
grade 304- 2 Nos., per sash, handle with mazak alloy
casting 1 No. per sash, multipoint locking system
suitably concealed 1 No., per sash provided with raiser
wedges for smooth operation and the system is to be
installed at the site using anchor fasteners, silicon
rubber sealant, easy glazing/ deglazing at site etc.,
including cost and conveyance of all materials,
accessories, labour charges for transportation, erection
at site with templates for casement sizing complete for
finished item of work
521 TBSC-M.I-25 Supplying and fixing of Unplasticised Poly Vinyl hloride (UPVC) casement
windows openable shutters duly manufactured using UPVC reinforced profiles
of 60 mm x 60 mm x 2.60 mm for outer frames, 82 mm x 60 mm x 2.60 mm
for Fix mullion (“T” or “Z” )made of 60mm x 82mm uPVC profile section with
steel reinforcement of size 35mm x 28mm x 1.5mm shall be provided in windows
having fixed panel as per the requirement. The shutter of outward open able
window shall be made of size 60mm x 77mm or for inward open able window shall
be made of size 60mm x 78mm; “T” shaped for outward open or “Z”
shaped for Inward open extruded 3 box multi-chamber uPVC window profile
section of white colour having outer wall thickness of 2.6mm (± 0.2mm) provided
with reinforcement of minimum 1.5mm thick G/J/U/S/O type GI section
prefabricated & welded through fusion welding. The window sash shall be fitted
with 5 mm thick clear float glass of reputed make duly fixed with Gasket for sash
& Glazing bead shall be co-extruded with Grey
colour soft PVC and accessories for casement
window – friction hinges of stainless steel grade 304-2 Nos., per sash, handle 1
No. per sash, multipoint locking system suitably concealed 1 No., per sash
provided with raiser wedges for smooth operation and the system is to be
installed at the
Supply and site
fixing of using anchor fasteners,
Pre Laminated silicon Particle
Cement Bonded rubber Board
sealant,
(as pereasy
IS-
14276) WINDOWS with Pre-Painted Steel Sections fabricated from pre-
painted Cold rolled formed sections made of galvanized steel color
coated sections {Base steel as per 15-512 quality, galvanized as per IS-277
with Zinc of 120 gram/sqm) with total coated thickness of 0.58mm primer coated
with epoxy primer of 5-7 microns thick, finish painted with polyester paint of
12-16 microns and back coated with alkyd backer of 5-7 microns), the sections for
outer frame and centre mullion (duly filled with PU form of 40 kg/Cum) should
be of 60mm x 50mm, with provision for fixing glazed shutter. The section for
glazed /paneled shutter should be of size 48mm x 25 mm and another section of size
60mm x 23mm should be provided for separating glazed and paneled portion 5
mm thick
colour pin headed glass is to be provided for glazing and providing guard bars of
10mm square rods duly welded at 150mm pitch to MS flat section of size 18mm
and 3mm thick. Windows are to be fixed to wall by means of self expansion
nylon Cap (75) and electroplated wooden screws of size 100mm, including
522 TBSC-M.I-26 Pre Laminated Cement Bonded Particle Board (as per IS-14276) WINDOWS WITH
PPS SECTIONS — Single shutter 2'0"x4'0" outer frame section size of 50mm x
60mm shutter frame section size of 48mm x 25mm
523 TBSC-M.I-27 Pre Laminated Cement Bonded Particle Board (as per IS-14276) WINDOWS
WITH PPS SECTIONS — Double shutter 3'0" x 4'0" outer frame section size of
50mm x 60mm shutter frame section size of 48mm x 25mm mullion section size of
50mm x 60mm for outer frame
534 TBSC-M.I-28 Pre Laminated Cement Bonded Particle Board (as per IS-14276) WINDOWS
WITH PPS SECTIONS — Double shutter 3'0" x 3'0" outer frame section size of
50mm x 60mm shutter frame section size of 48mm x 25mm Mullion section size of
50mm x 60mm for outer frame.
535 TBSC-M.I-29 Pre Laminated Cement Bonded Particle Board (as per IS-14276) WINDOWS
WITH PPS SECTIONS —Double shutter 4'0"x4'0" outer frame section size of
50mm x 60mm shutter frame section size of 48mm x 25mm Mullion section size of
50mm x 60mm for outer frame.
II SUB-SECTION SLIDING WINDOWS
521 TBSC-M.II-01 Providing and Fixing Pre-painted steel Sliding Window
fabricated from Roll formed sections made of galvanized
Steel colour coated/powder coated steel as per IS 513 ‘D’ quality, galvanized
as per IS 277 thickness of 0.58mm, primer coat with epoxy primer, finish painted
with a polyester paint or powder coated with pure polyester
powder and the section for external frame bottom of 79
x 44 mm, external frame sides and top of 69 x 24 mm, guide for top and bottom
of 69 x 26 mm (Stainless Steel) and section for shutter of 26 x 30 mm and panelled
with
5mm thick plain float glass fitted with EPDM gaskets
sections cut to length, joined and assembled by means of
corner bracket, including fixing windows in the
concrete/masonry walls by means of self expanding
brackets & screws including 10mm square guard bars
with 6” pitch (152.4mm) and all taxes etc., complete for
finished item of work

522 TBSC-M.II-02 Providing and fixing of Two shutter Sliding Windows


made of Galvanized Steel as per IS 513, D quality,
galvanized as per IS 277 with powder coated with Pure
polyester powder up to 50-60 microns thick with total
coated thickness of 0.8 mm for Outer Frame and 0.58
mm thickness for Sliding Shutter Section, the Outer
Frame for Two Tracks without grill provision is of 75
mm x 50 mm and the Window Shutter section of 58 mm
x 36 mm and the outer Frame with two integrated guide
tracks of 12mm width and 24mm deep for provision to
slide the Shutter / sash frame and facilitates with a
water drain outlet component made of PVC and the
shutter frame fitted with 5mm thick plain float glass of
reputed make and fixed with EPDM weathering seal
resistant accessories and handle made of Alumimium 1
No. per each shutter including installation of window
system at site using anchor fasteners, Silicon sealant
applied at the Outer frame corners inclusive of
conveyance of all materials accessories, labour charges,
and erection at site with complete finished item of work
for Window with Two Sliding Shutters and without Grill

523 TBSC-M.II-03 Providing and fixing of Two shutter Sliding Windows


made of Galvanized Steel as per IS 513, D quality,
galvanized as per IS 277 with powder coated with Pure
polyester powder up to 50-60 microns thick with total
coated thickness of 0.8 mm for Outer Frame and 0.58
mm thickness for Sliding Shutter Section, the Outer
Frame for Two Tracks with Grill provision size of 90 mm
x 50 mm and the Window Shutter section of 58 mm x 36
mm and the outer Frame with two integrated guide
tracks of 12mm width and 24mm deep for provision to
slide the Shutter / sash frame and facilitates with a
water drain outlet component made of PVC and the
shutter frame fitted with 5mm thick plain float glass of
reputed make and fixed with EPDM weathering seal
resistant accessories and handle made of Alumimium 1
No. per each shutter including installation of window
system at site using anchor fasteners, Silicon sealant
applied at the Outer frame corners inclusive of
conveyance of all materials accessories, labour charges,
and erection at site with complete finished item of work
for Window with Two Sliding Shutters and with Grill
524 TBSC-M.II-04 Providing and fixing of Three shutter Sliding Windows
made of Galvanized Steel as per IS 513, D quality,
galvanized as per IS 277 powder coated with Pure
polyester powder and thickness of 0.8 mm for Outer
Frame and 0.58 mm thickness for Sliding Shutter
Section, with two integrated guide tracks of 12mm
width and 24mm deep for provision to slide the Shutter
/ sash frame and facilitates with a water drain outlet
component made of PVC and the shutter frame fitted
with 5mm thick plain float glass of reputed make and
fixed with EPDM weathering seal resistant accessories
and handle made of Alumimium 1 No. per each shutter
and including installation of window system at site
using anchor fasteners, Silicon sealant applied at the
Outer frame corners inclusive of conveyance of all
materials accessories, labour charges, and erection at
site with complete finished item of work for i) Center
Shutter Fixed: center shutter frame made of section
with size 20mm x 47mm should be fitted with 5mm
thick plain float glass of reputed make, EPDM gasket all
around the glass and fixed to the Outer Frame with the
supporting section of size 29mm x 20mm of 0.58mm
thick fixed horizontally on top and bottom of the shutter
frame.

525 TBSC-M.II-05 Providing and fixing of Three shutter Sliding Windows


made of Galvanized Steel as per IS 513, D quality,
galvanized as per IS 277 powder coated with Pure
polyester powder and thickness of 0.8 mm for Outer
Frame and 0.58 mm thickness for Sliding Shutter
Section, with two integrated guide tracks of 12mm
width and 24mm deep for provision to slide the Shutter
/ sash frame and facilitates with a water drain outlet component made of PVC
and the shutter frame fitted
with 5mm thick plain float glass of reputed make and
fixed with EPDM weathering seal resistant accessories
and handle made of Alumimium 1 No. per each shutter
and including installation of window system at site
using anchor fasteners, Silicon sealant applied at the
Outer frame corners inclusive of conveyance of all
materials accessories, labour charges, and erection at
site with complete finished item of work for ii) Center
Shutter Sliding: center shutter frame made of section of
size 20mm x 47mm should be fitted with 5 mm
thick plain float glass of reputed make. The supporting
guide section of size 15mm x 19mm of 0.58mm thick
fixed horizontally at top and bottom of shutter frame
and slides along the bottom and top guide tracks made
of sections size 24mm x 20mm of 0.58mm thick and
29mm x 20mm of 0.58mm thick and iii) Center Fly
mesh Shutter Sliding: Section for Fly mesh Shutter
frame should be of size 20mm x 40mm of 0.58mm thick
and fitted with SS mesh (304 Grade). The supporting
guide section of size 29mm x 20mm of 0.58mm thick at
the bottom and 15mm x 19mm of 0.58mm thick at the
top fixed horizontally to the Fly mesh frame and slides
along the bottom and top guide tracks made of sections
size 20mm x 20mm of 0.58mm and 29mm x 20mm of
0.58mm.
526 TBSC-M.II-06 Providing and fixing of Three shutter Sliding Windows
made of Galvanized Steel as per IS 513, D quality,
galvanized as per IS 277 powder coated with Pure
polyester powder and thickness of 0.8 mm for Outer
Frame and 0.58 mm thickness for Sliding Shutter
Section, with two integrated guide tracks of 12mm
width and 24mm deep for provision to slide the Shutter
/ sash frame and facilitates with a water drain outlet
component made of PVC and the shutter frame fitted
with 5mm thick plain float glass of reputed make and
fixed with EPDM weathering seal resistant accessories
and handle made of Alumimium 1 No. per each shutter
and including installation of window system at site
using anchor fasteners, Silicon sealant applied at the
Outer frame corners inclusive of conveyance of all
materials accessories, labour charges, and erection at
site with complete finished item of work for Window
with 3 shutters (Center fixed shutter / Center sliding
shutter / center Fly mesh shutter) and without Grill
Window made of Outer Frame of size 90mm x 50mm. i)
Center Shutter Fixed: center shutter frame made of
section with size 20mm x 47mm of 0.58mm thick should
be fitted with 5mm thick plain float glass of reputed
make, EPDM gasket all around the glass and fixed to the
Outer Frame with the supporting section of size 29mm x
20mmof 0.58mm thick fixed horizontally on top and
bottom of the shutter frame.

527 TBSC-M.II-07 Providing and fixing of Three shutter Sliding Windows


made of Galvanized Steel as per IS 513, D quality,
galvanized as per IS 277 powder coated with Pure
polyester powder and thickness of 0.8 mm for Outer
Frame and 0.58 mm thickness for Sliding Shutter
Section, with two integrated guide tracks of 12mm
width and 24mm deep for provision to slide the Shutter
/ sash frame and facilitates with a water drain outlet
component made of PVC and the shutter frame fitted
with 5mm thick plain float glass of reputed make and
fixed with EPDM weathering seal resistant accessories
and handle made of Alumimium 1 No. per each shutter
and including installation of window system at site
using anchor fasteners, Silicon sealant applied at the
Outer frame corners inclusive of conveyance of all
materials accessories, labour charges, and erection at
site with complete finished item of work for Window
with 3 shutters (Center fixed shutter / Center sliding
shutter / center Fly mesh shutter) and without Grill
Window made of Outer Frame of size 90mm x 50mm. ii)
Center Shutter Sliding: center shutter frame made of
section with size 20mm x 47mm of 0.58mm thick should
be fitted with 5 mm thick plain float glass of reputed
make. The supporting guide section of size 15mm x
19mm of 0.58mm thick fixed horizontally at top and
bottom of shutter frame and slides along the bottom and
top guide tracks made of sections size 24mm x 20mm of
0.58mm thick and 29mm x 20mm of 0.58mm thick.
528 TBSC-M.II-08 Providing and fixing of Three shutter Sliding Windows
made of Galvanized Steel as per IS 513, D quality,
galvanized as per IS 277 powder coated with Pure
polyester powder and thickness of 0.8 mm for Outer
Frame and 0.58 mm thickness for Sliding Shutter
Section, with two integrated guide tracks of 12mm
width and 24mm deep for provision to slide the Shutter
/ sash frame and facilitates with a water drain outlet
component made of PVC and the shutter frame fitted
with 5mm thick plain float glass of reputed make and
fixed with EPDM weathering seal resistant accessories
and handle made of Alumimium 1 No. per each shutter
and including installation of window system at site
using anchor fasteners, Silicon sealant applied at the
Outer frame corners inclusive of conveyance of all
materials accessories, labour charges, and erection at
site with complete finished item of work for Window
with 3 shutters (Center fixed shutter / Center sliding
shutter / center Fly mesh shutter) and without Grill
Window made of Outer Frame of size 90mm x 50mm.
iii) Center Fly mesh Shutter Sliding: Section for Fly
mesh shutter frame should be of size 20mm x 40mm
and fitted with SS mesh (304 Grade). The supporting
guide section of size 29mm x 20mm of 0.58mm thick at
the bottom and 15mm x 19mm of 0.58mm thick at the top fixed horizontally to
the Fly mesh frame and slides
along the bottom and top guide tracks made of sections
size 20mm x 20mm of 0.58mm thick and 29mm x 20mm
of 0.58mm thick.

529 TBSC-M.II-09 Supplying and fixing of Unplasticised Poly Vinyl


Chloride (UPVC) sliding windows two track sliding
duly manufactured using UPVC reinforced profiles of
(62 mm x 60 mm)/(60 mm x 45 mm)/ (60 mm x 52
mm) x 2.0 mm for outer frames, (66 mm x 38 mm)/(58
mm x 39 mm)/ (60 mm x 42 mm) x 2.0 mm for sliding
shutter frames capable of mounting single glazing
system, structurally reinforced with hot dip galvanized
up to 50 microns of minimum thickness of 1.2 mm
prefabricated & welded through fusion welding the
window sash shall be fitted with 5 mm thick clear float
glass of reputed make duly fixed with TPV Gaskets/
EPDM weathering seal resistant accessories like locking
system 1 No., per set of sashes and the system is to be installed at the
site using anchor fasteners, silicon rubber sealant, easy glazing/
deglazing at site etc., including cost and conveyance of all
materials, accessories, labour charges for transportation, erection at site with
templates for casement sizing complete for finished item of work
530 TBSC-M.II-10 Supplying and fixing of Unplasticised Poly Vinyl
Chloride (UPVC) sliding windows three track - only two
glass shutters sliding duly manufactured using UPVC
reinforced profiles of (80 mm x 52 mm)/ (94 mm x 45
mm) x 2.0 mm for outer frames, (54 mm x 38 mm)/(39
mm x 58 mm) x 2.20 mm for sliding shutter frames
capable of mounting single glazing system, structurally
reinforced with hot dip galvanized up to 50 microns of
minimum thickness of 1.2 mm prefabricated & welded
through fusion welding the window sash shall be fitted
with 5 mm thick clear float glass of reputed make duly
fixed with TPV Gaskets/ EPDM weathering seal resistant
accessories like locking system 1 No., per set of sashes
and the system is to be installed at the site using anchor
fasteners, silicon rubber sealant, easy glazing/
deglazing at site etc., including cost and conveyance of
all materials, accessories, labour charges for
transportation, erection at site with templates for
casement sizing complete for finished item of work

531 TBSC-M.II-11 Supplying and fixing of Unplasticised Poly Vinyl


Chloride (UPVC) sliding windows three track - two glass
shutters sliding and one mesh shutter duly
manufactured using UPVC reinforced profiles of (94 mm
x 45 mm)/(80 mm x 52 mm) / (88 mm x 52 mm) x 2.0
mm for outer frames, (58 mm x 39 mm)/(54 mm x 38
mm) / (88 mm x 42 mm)x 2.0 mm for sliding shutter
frames capable of mounting single glazing system
structurally reinforced with hot dip galvanized up to 50
microns of minimum thickness of 1.2 mm prefabricated
& welded through fusion welding the window sash shall
be fitted with 5 mm thick clear float glass of reputed
make and mesh shutter frame shall be (42 mm x 25
mm)/58 mm x 28 mm)/ (52 mm x 21.5 mm) x 2 mm
fitted with nylon/ polymer mesh on rollers/ pulley duly
fixed with TPV Gaskets/ EPDM weathering seal resistant
accessories like locking system 1 No., per set of sashes
and the system is to be installed at the site using anchor
fasteners, silicon rubber sealant, easy glazing/
deglazing at site etc., including cost and conveyance of
all materials, accessories, labour charges for
transportation, erection at site with templates for
casement sizing complete for finished item of work

532 TBSC-M.II-12
533 TBSC-M.II-13 Providing and Fixing Pre painted Steel Sliding Windows / Doors - 3 track
sliding window /doors shutter with mesh shutter – (2 - glass shutters and 1 -
mesh shutter) fabricated from Roll formed sections made of galvanized Steel
colour coated/powder coated (Base Steel as per IS 513 ‘D’ quality,
galvanized as per IS 277 with zinc of 120 GM/Sq.mtr) with total coated thickness
of 0.58mm. Primer coat with epoxy primer of 5-7 microns thick, finish
painted with a polyester paint of 12-16 microns thick and back coated with Alkyd
backer of 5-7 microns or powder coated with pure polyester powder up to 50- 60
microns thick. Section for external frame should be of 44 x 107mm .Section for
glass shutter and mesh shutter in case of door should be of 35 x 67 mm
Section for euro groove should be 25 x 31mm (Aluminium/ Plastic) (in
case of window sections should be 35 x 49 mm and 25 x 24 mm and 30 x 41
mm) and Lap Strip should be of 39 x 41mm (30 x 41 mm & Touch lock for window )
(Aluminium/ Plastic. The doors/ windows should be panelled with 5mm thick
plain float glass. Corner bracket for internal and external frame made of
glass filled nylon. Gaskets are to be made of Ethyl Propylene Diamine
Monomer (EPDM).The sections are to be cut to length, joined and
assembled by means of corner bracket. The above frames should be fixed to
534 TBSC-M.II-14 Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) 2 Track–2
Panel Sliding windows duly manufactured using UPVC reinforced profiles of 60
mm x 49 mm x 2.20 mm for outer frames, 62 mm x 41 mm x 2.20 mm for
sliding shutter frames capable of mounting single glazing system,
structurally reinforced with 30 mm 15 mm x 1.5 mm with hot dip galvanized up
to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded
through fusion welding. The window sash shall be fitted with 5 mm thick clear
float glass of reputed make duly fixed with Grey colour TPV Gasket for
sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System
shall have single point locking with Touch Lock and the system is to be installed
at the site using anchor fasteners, silicon
rubber sealant, easy glazing/ deglazing at site etc., including cost and
conveyance of all materials, accessories, labour charges for
transportation, erection at site complete for finished item of work.

535 TBSC-M.II-15 Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) 2 Track–2
Panel Sliding windows with mesh duly manufactured using UPVC reinforced
profiles of 91 mm x 49 mm x 2.20 mm for outer frames, 62 mm x 41 mm
x 2.20 mm for sliding shutter frames capable of mounting single glazing
system, structurally reinforced with 30 mm 15 mm x 1.5 mm with hot dip galvanized
up to 50 microns of minimum thickness of 1.0/1.2 mm and the shutter of fly
screen with fibre mesh shall be made of size 21mm x 58mm extruded
uPVC window profile section of white colour having outer wall thickness of
2.2mm (± 0.3mm) provided with reinforcement of minimum 1.5mm thick
G/J/U/S/O type GI section duly mitred cut and thermal welded at all corners
and prefabricated & welded through fusion welding. The window sash shall be
fitted with 5 mm thick clear float glass of reputed make & Glazing bead
shall be co-extruded with Grey colour soft PVC. System shall have single
point locking with Touch Lock and the system is to be installed at the site
using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site
etc., including cost and conveyance of all materials, accessories, labour
III SUB-SECTION VENTILLATORS
533 TBSC-M.III-01 Supply and fixing of pre-painted steel top hung and fixed
louvered ventilators made of pre - painted steel as per
IS 513 of -0.58 mm thick 'D quality, galvanized as per IS
277, finish painted with a polyester paint & 4 mm
pinhead glass for ventilators with EPDM Gasket with
handle made of high grade aluminium powder coated
and nylon receiver, corner brackets made of CRCA with
Zinc Phosphate, Mullion caps made of glass filled nylon,
frames fixed to the concrete /masonry wall by means of
self expanding screws including 10 mm square guard
bars with 6 pitch complete for finished item of work for
(i) Ventilators: Top Hung 2 '-0 x 2'-0 (609.6x609.6mm)
outer frame section size of 46mm x 52 mm shutter
frame section size of 46mm x 46 mm and (ii)
Ventilators: Top Hung 4 '-0 x 2'-0 (1219.2x609.6mm)
outer frame section size of 46 x 52 m shutter frame
section size of 46 x 46 mm Mullion section size of 46 x
70 mm and (iii) Ventilators: Top Hung 4 '-0 x 3'-0
(1219.2x914.4mm) outer frame section size of 46 x 52m
m shutter frame section size of 46 x 46 mm Mullion
section size of 46 x 70 mm
534 TBSC-M.III-02 Supply and fixing of pre-painted steel top hung and fixed
louvered ventilators made of pre - painted steel as per
IS 513 of -0.58 mm thick 'D quality, galvanized as per IS
277, finish painted with a polyester paint & 4 mm
pinhead glass for ventilators with EPDM Gasket with
handle made of high grade aluminium powder coated
and nylon receiver, corner brackets made of CRCA with
Zinc Phosphate, Mullion caps made of glass filled nylon,
frames fixed to the concrete /masonry wall by means of
self expanding screws including 10 mm square guard
bars with 6 pitch complete for finished item of work for
(i) Ventilators: Fixed louvers 2'-0 x 2'-0
(609.6x609.6mm)(Box section) outer frame section size
of 33 x 56 mm and (ii) Ventilators: Fixed louvers 4'-0 x
2'-0 (1219.2 x 609.6 mm) (Box section) outer frame
section size of 33 x 56 mm Mullion section size of 33 x
56 mm and (iii) Ventilators: Fixed louvers 4'-0 x 3'-0
(1219.2 x 914.4 mm) (Box section) outer frame section
size of 33 x 56 mm Mullion section size of 33 x 56 mm

535 TBSC-M.III-03 Providing and fixing of top hung Ventilators made of


pre-painted steel as per IS 513 of 0.80 mm thick
galvanized as per IS 277 with a polyester paint with 1
No. of High grade nylon latch handle, window stopper, 2
nos. of with MS Powder coated /SS ball bearing butt
Hinges provided per shutter and fitted with 4 mm thick
plain float glass with rubber gaskets including fixing the
frames in concrete/masonry wall by means of self
expanding screws, Including 10 mm Square guard bars
with 6” (152.4mm) pitch etc., complete for finished item
of work for (i) Single openable ventilator shutter size of
2’ 0” x 2’ 0” (609.6 x 609.6mm) outer frame section size
of 80 x 45mm, shutter frame section size of 52 x 25mm
thick and (ii) Double openable ventilator shutter Size of
4’ 0” x 2’ 0” (1219.2mm x 609.6mm) outer frame section
size of 80 x 45mm,shutter frame section size of 52 x
25mm, vertical mullion section size of 80 x 60 mm and
(iii) Double openable fix shutter size of 4’0” x 3’0”
(1219.2mm x 914.4mm) outer frame section size of 80 x
45mm , shutter frame section size of 52 x 25 mm
,Vertical mullion section size of 80 x 60 mm

536 TBSC-M.III-04 Providing and fixing of louvered Ventilators made of


pre-painted steel as per IS 513 of 0.80 mm thick galvanized as per IS
277 with a polyester paint with and
fitted with 4 mm thick plain float glass including fixing
the frames in concrete/masonry wall by means of self
expanding screws, etc., complete for finished item of
work for (i) Single fixed Louvers Ventilator size of 2’ 0”
x 2’ 0” (609.6 x 609.6mm) outer frame box section size
of 80 x 45mm and (ii) Double fixed Louvers ventilator
Size of 4’ 0” x 2’ 0” (1219.2mm x 609.6mm) outer frame
box section size of 80 x 45mm, vertical mullion section
size of 80 x 60 mm and (iii) Double fixed Louvers
Ventilator size of 4’0” x 3’0” (1219.2mm x 914.4mm) outer frame box section
size of 80 x 45mm , Vertical
mullion section size of 80 x 60 mm
537 TBSC-M.III-05 Providing and fixing of top hung Ventilator with fly
mesh made of pre-painted steel as per IS 513 of 0.80
mm thick galvanized as per IS 277 with Zinc, finish
painted with a polyester paint, section for fly-shutter of
0.6 mm thick and fitted with stainless steel 32 gauge fly
mesh of 304 grade and mullions to have double rebate
for glazed shutter and fly-shutter with a provision for
guard bars/grills and 1 No. of High grade nylon latch
handle, window stopper, 2 nos. of with MS Powder coated /SS ball bearing
butt Hinges provided per shutter and windows fitted with 4 mm thick plain float
glass with rubber gaskets including fixing the frames in concrete/masonry
wall by means of self expanding screws, Including 10 mm Square guard
bars with 6” (152.4mm) pitch etc., complete for finished item of work for (i) Single
openable ventilator shutter window size of 2’ 0” x 2’ 0” (609.6 x 609.6mm) outer
frame section size of 100 x 45mm, Glazed and fly mesh shutter frame
section size of 52 x 25mm thick and (ii) Double openable ventilator
538 TBSC-M.III-06 Providing and fixing of top hung Ventilator with fly
mesh made of pre-painted steel as per IS 513 of 0.80
mm thick galvanized as per IS 277 with Zinc, finish
painted with a polyester paint, section for fly-shutter of
0.6 mm thick and fitted with stainless steel 32 gauge fly
mesh of 304 grade and mullions to have double rebate
for glazed shutter and fly-shutter with a provision for
guard bars/grills and 1 No. of High grade nylon latch
handle, window stopper, 2 nos. of with MS Powder
coated /SS ball bearing butt Hinges provided per shutter
and windows fitted with 4 mm thick plain float glass
with rubber gaskets including fixing the frames in
concrete/masonry wall by means of self expanding
screws, Including 10 mm Square guard bars with 6”
(152.4mm) pitch etc., complete for finished item of work
for (i) Single fixed Louvers Ventilator window size of 2’
0” x 2’ 0” (609.6 x 609.6mm) outer frame box section
size of 100 x 45mm, fly mesh shutter frame section size
52 x 25 mm and (ii) Double fixed Louvers ventilator
window Size of 4’ 0” x 2’ 0” (1219.2mm x 609.6mm)
outer frame box section size of 100 x 45mm, fly mesh
shutter frame section size 52 x 25 mm, vertical mullion
section size of 100 x 60 mm and (iii) Double fixed Louvers Ventilator
window size of 4’0” x 3’0”
(1219.2mm x 914.4mm) outer frame box section size
100 x 45mm , fly mesh shutter frame section size 52 x
25 mm Vertical mullion section size of 100 x 60 mm

539 TBSC-M.III-07 Providing, supplying & fixing of Fixed Louvered


Ventilator made out of multi chambered uPVC sections
with TPV gaskets having isolated drainage and
reinforced with Galvanized Iron profiles throughout the
window. The outer frame having an overall size of 60 x
55 mm with reinforcement of 1 mm thickness and
Mullion with overall size of 74 x 60 mm with reinforcement of 1
mm thickness. Ventilator shall be provided with 4.5 mm Pin Head
glass, standard hardware. Wall thickness of frame & Mullion shall be 2.0 mm
540 TBSC-M.III-08 Providing, supplying & fixing of Top hung Ventilator
With Exhaust Fan Provision made out of multi
chambered uPVC sections with TPV gaskets having
isolated drainage and reinforced with Galvanized Iron
profiles throughout the window. The outer frame having
a overall size of 60 x 55 mm with reinforcement of 1 mm
thickness, Mullion with overall size of 74 x 60 mm with
reinforcement of 1 mm thickness and Sash with overall
size of 75 x 60 mm with reinforcement of 1.5 mm
thickness. Glazing bead for fixing of glass shall be of size
34 x 20 mm coextruded with gasket. Ventilator shall be
provided with 4.5 mm Pin Head glass, standard
hardware, single point locking and friction stays. Wall
thickness of frame, mullion and sash shall be 2.0 mm

N SECTION STRUCTURAL GLAZING & CURTAIN WALLING


(Landing cost - including cost of conveyance, loading & unloading)
I SUB-SECTION FIXED GLAZING
541 TBSC-N.I-01 Supplying and fixing of curtain Glazing made of pre painted steel as per IS
513 of 0.58 mm thick D quality, galvanized as per IS 277 Primer coated
with epoxy, finish painted with a polyester paint using the section for outer
frame of 46 x 52 mm, section for mullion of 46 x 70 mm and section for beading of
18 x 25 mm and the glazing with 5 mm thick plain float glass fitted with
EPDM gaskets including handle made of high grade Aluminium powder
coated and nylon receiver, corner brackets made of CRCA with zinc
phosphating, mullion caps made of Glass filled nylon including fixing the
frames in the concrete / masonry wall with self expanding screws, etc.,
excluding scaffolding complete for finished item - Fixed Glazing 2'-0
x 2'-0 (609.6x609.6mm) and Fixed Glazing 2'-0 x 3'-0
(609.6x914.4mm)

542 TBSC-N.I-02 Supplying and fixing of curtain Glazing made of pre


painted steel as per IS 513 of 0.58 mm thick D quality,
galvanized as per IS 277 Primer coated with epoxy,
finish painted with a polyester paint using the section
for outer frame of 46 x 52 mm, section for mullion of 46
x 70 mm and section for beading of 18 x 25 mm and the
glazing with 5 mm thick plain float glass fitted with
EPDM gaskets including handle made of high grade
Aluminium powder coated and nylon receiver, corner
brackets made of CRCA with zinc phosphating, mullion
caps made of Glass filled nylon including fixing the
frames in the concrete / masonry wall with self
expanding screws, etc., excluding scaffolding complete
for finished item.- Fixed Glazing 3'-0 x 3'-0
(914.4x914.4mm) and Fixed Glazing 3'-0 x 4'-0
(914.4x1219.2mm)

543 TBSC-N.I-03 Supplying and fixing of Unplasticised Poly Vinyl


Chloride (UPVC) Fixed Glazing - 48 series duly
manufactured using UPVC reinforced profiles of 60 mm
x 48 mm x 2.25 mm for outer frames and the mullion
sections are of 60 mm x 76 mm x 2.25 mm frames are
structurally reinforced with hot dip galvanized up to 50
microns of minimum thickness of 1.2 mm the sash shall
be fitted with 5 mm thick clear float glass of reputed
make duly fixed with EPDM weathering seal resistant
including cost and conveyance of all materials,
accessories, labour charges for transportation, erection
at site with templates for casement sizing excluding
scaffolding complete for finished item of work
544 TBSC-N.I-04 Supplying and fixing of Unplasticised Poly Vinyl
Chloride (UPVC) Fixed Glazing - 56 series duly
manufactured using UPVC reinforced profiles of 60 mm
x 56 mm x 2.25 mm for outer frames and the mullion
sections are of 60 mm x 70 mm x 2.25 mm frames are
structurally reinforced with hot dip galvanized up to 50
microns of minimum thickness of 1.2 mm the sash shall
be fitted with 5 mm thick clear float glass of reputed
make duly fixed with EPDM weathering seal resistant
including cost and conveyance of all materials,
accessories, labour charges for transportation, erection
at site with templates for casement sizing excluding
scaffolding complete for finished item of work

545 TBSC-N.I-05 Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) Fixed
Glazing/ Window duly manufactured using UPVC reinforced profiles of 60
mm x 60 mm x 2.60 mm for frames and the mullion sections are of 60 mm x 82
mm x 2.60 mm frames are structurally reinforced with hot dip galvanized up to 50
microns of size 35 mm x 28 mm of thickness 1.5 mm the sash shall be fitted
with 5 mm thick clear float glass of reputed make duly fixed with EPDM
weathering seal resistant and glazing bead 34.5 mm x 18 mm including cost
and conveyance of all materials, accessories, labour charges for
transportation, erection at site with templates for casement sizing complete for
finished item of work

II SUB-SECTION STRUCTURAL GLAZING


545 TBSC-N.II-01 Providing and fixing Structural Glazing fabricated from
Roll formed sections made of Pre-painted Steel /
Powder coated base steel as per IS 513 of ‘D’ quality,
galvanized as per IS 277 and the glass holding section
made of 304 grade stainless steel of 0.58 mm thick
galvanized steel section as stiffeners inside the colour
coated steel powder coated sections as per the design
requirement & calculations to suit wind pressures as
given in IS: 875, the primer coat with epoxy primer,
finish painted with a polyester paint or powder coated
with pure polyester powder and the vertical section of
50 mm x 99 mm x 0.72 mm, 33 mm x 56 mm x 0.72 mm
for frame horizontal section, stiffener section of 47 mm
x 97 mm x 1 mm, cover profiles sections of 20 mm x 58
mm x 0.58 mm, glass holding section of 37 mm x 37 mm
& 37 mm x 18 mm including fixing 5mm thick Ocean
Blue reflective glass, brackets made of CRCA powder
coated/Electroplated to connect vertical to horizontal,
vertical to slab, to fix verticals at top & bottom as per
site requirement and EPDM gasket, U.V. resistant silicon
sealant including fixing in concrete/masonry wall with
self-expanding cap & screws inclusive of cost and
conveyance of all materials to site, all labour charges,
incidental charges, cost of all consumables etc. and
fixing charges excluding scaffolding complete for
finished item of work.
546 TBSC-N.II-02 Providing and fixing Top Hung shutters in Structural
Glazing fabricated from Roll formed sections made of
Pre-painted Steel / Powder coated base steel as per IS
513 of ‘D’ quality, galvanized as per IS 277 and the glass
holding section made of 304 grade stainless steel of 0.58
mm thick, duly providing stiffeners inside the colour
coated steel/powder coated sections as per the design
requirement, calculations to suit wind pressures as
given in IS 875 and primer coat with epoxy primer and
powder coated with pure polyester powder up to 50-60
microns thick and the outer frame of 20 mm x 58 mm x
0.58 mm, shutter sections of 57 mm x 33 mm x 0.72 mm,
stiffener sections of 55 mm x 31 mm x 1mm, hinges – 2
Nos for each shutter and aluminium Stays – 2 Nos. for
each shutter, aluminium Handle – 1 no. for each shutter
including cost and conveyance of all materials to site, all
labour charges, incidental charges, cost of all
consumables etc. and fixing charges etc excluding
scaffoldingcomplete for finished item of work

III SUB-SECTION CURTAIN WALLING


547 TBSC-N.III-01 Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) Curtain Walling
systems duly manufactured using UPVC reinforced profiles of 60 mm x 56 mm x 2.5
mm for outer frames, 60 mm x 70 mm x 2.5 mm for casement shutter frames and the
mullion sections are of 60 mm x 70 mm x 2.5 mm or 60 mm x 62 mm x 2.5 mm for
sliding shutter outer frames and 77 mm x 38 mm x 2.5 mm for sliding shutter frames
structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness
of 1 mm the sash shall be fitted with 5 mm thick clear float glass of reputed make duly
fixed with EPDM weathering seal resistant and accessories for casement window -
friction stay hinges of stainless steel rade 304 - 2 Nos., per sash, handle with mazak
alloy casting 1 No. per sash, multipoint locking system suitably concealed 1 No., per
sash provided with raiser wedges for smooth operation for sliding window - clipping
locking system 1 No. made of aluminium including cost and conveyance of all
materials, accessories, labour charges for transportation, erection at site with
templates for casement sizing excluding scaffolding complete for finished item of work

P SECTION FIXTURES FOR DOORS & WINDOWS


(Landing cost - including cost of conveyance, loading & unloading)
I SUB-SECTION TOWER BOLTS
548 TBSC-P.I-01 Brass Tower Bolt-10 mm Bolt (IS:204) 100 mm Long
549 TBSC-P.I-02 Brass Tower Bolt-10 mm Bolt (IS:204) 150 mm Long
550 TBSC-P.I-03 Brass Tower Bolt-10 mm Bolt (IS:204) 200 mm Long
551 TBSC-P.I-04 Brass Tower Bolt-10 mm Bolt (IS:204) 250 mm Long
552 TBSC-P.I-05 Brass Tower Bolt-10 mm Bolt (IS:204) 300 mm Long
553 TBSC-P.I-06 Aluminium Tower Bolt-10 mm Bolt (IS:204) 75 mm Long
554 TBSC-P.I-07 Aluminium Tower Bolt-10 mm Bolt (IS:204) 100 mm Long
555 TBSC-P.I-08 Aluminium Tower Bolt-10 mm Bolt (IS:204) 150 mm Long
556 TBSC-P.I-09 Aluminium Tower Bolt-10 mm Bolt (IS:204) 200 mm Long
557 TBSC-P.I-10 Aluminium Tower Bolt-10 mm Bolt (IS:204) 250 mm Long
558 TBSC-P.I-11 Aluminium Tower Bolt-10 mm Bolt (IS:204) 300 mm Long
559 TBSC-P.I-12 Aluminium Tower Bolt-10 mm Bolt (IS:204) 350 mm Long
560 TBSC-P.I-13 Aluminium Tower Bolt-10 mm Bolt (IS:204) 450 mm Long
561 TBSC-P.I-14 MS-Powder Coated Tower Bolt-10 mm Bolt (IS:204) 100 mm Long
562 TBSC-P.I-15 MS-Powder Coated Tower Bolt-10 mm Bolt (IS:204) 150 mm Long
563 TBSC-P.I-16 MS-Powder Coated Tower Bolt-10 mm Bolt (IS:204) 200 mm Long
564 TBSC-P.I-17 MS-Powder Coated Tower Bolt-10 mm Bolt (IS:204) 250 mm Long
565 TBSC-P.I-18 MS-Powder Coated Tower Bolt-10 mm Bolt (IS:204) 300 mm Long
585 TBSC-P.I-19 Stainless Steel Tower Bolt-10 mm Bolt (IS:15833) 75 mm Long
586 TBSC-P.I-20 Stainless Steel Tower Bolt-10 mm Bolt (IS:15833) 100 mm Long
587 TBSC-P.I-21 Stainless Steel Tower Bolt-10 mm Bolt (IS:15833) 150 mm Long
588 TBSC-P.I-22 Stainless Steel Tower Bolt-10 mm Bolt (IS:15833) 200 mm Long
589 TBSC-P.I-23 Stainless Steel Tower Bolt-10 mm Bolt (IS:15833) 250 mm Long
590 TBSC-P.I-24 Stainless Steel Tower Bolt-10 mm Bolt (IS:15833) 300 mm Long
II SUB-SECTION HINGES
566 TBSC-P.II-01 Brass Butt hinges (IS:205)- 75 mm Long
567 TBSC-P.II-02 Brass Butt hinges (IS:205)- 100 mm Long
568 TBSC-P.II-03 Brass Butt hinges (IS:205)- 125 mm Long
569 TBSC-P.II-04 Brass Butt hinges (IS:205)- 150 mm Long
570 TBSC-P.II-05 Aluminium Butt hinges (IS:205)- 75 mm Long
571 TBSC-P.II-06 Aluminium Butt hinges (IS:205)- 100 mm Long
572 TBSC-P.II-07 Aluminium Butt hinges (IS:205)- 125 mm Long
573 TBSC-P.II-08 Aluminium Butt hinges (IS:205)- 150 mm Long
574 TBSC-P.II-09 MS-Powder Coated Butt hinges (IS:205)- 75 mm Long
575 TBSC-P.II-10 MS-Powder Coated Butt hinges (IS:205)- 100 mm Long
576 TBSC-P.II-11 MS-Powder Coated Butt hinges (IS:205)- 125 mm Long
577 TBSC-P.II-12 MS-Powder Coated Butt hinges (IS:205)- 150 mm Long
578 TBSC-P.II-13 Deluxe window stay Aluminium
579 TBSC-P.II-14 Brass Windows Stay
580 TBSC-P.II-15 GI Powder Coated Friction stay hinges of 10" Long for windows
581 TBSC-P.II-16 Continuous Piano Hinges Powder coated Mild steel as per IS-3818 : 1992 of nominal
size 25 mm (B) of thickness 0.8 to 1.0 mm
582 TBSC-P.II-17 Box hinges for cup boards
583 TBSC-P.II-18 GI Powder Coated Friction stay hinges of 14" Long for windows
584 TBSC-P.II-19 Stainless Steel Butt hinges (IS:12817)- 75 mm Long
585 TBSC-P.II-20 Stainless Steel Butt hinges (IS:12817)- 100 mm Long
586 TBSC-P.II-21 Stainless Steel Butt hinges (IS:12817)- 125 mm Long
587 TBSC-P.II-22 Stainless Steel Butt hinges (IS:12817)- 150 mm Long
III SUB-SECTION DOOR HANDLES
583 TBSC-P.III-01 Aluminium Door Handles (IS:208) 75 mm Long
584 TBSC-P.III-02 Aluminium Door Handles (IS:208) 100 mm Long
585 TBSC-P.III-03 Aluminium Door Handles (IS:208) 125 mm Long
586 TBSC-P.III-04 Aluminium Door Handles (IS:208) 150 mm Long
587 TBSC-P.III-05 MS-Powder Coated Door Handles (IS:208) 125 mm Long
588 TBSC-P.III-06 MS-Powder Coated Door Handles (IS:208) 150 mm Long
589 TBSC-P.III-07 Brass fancy handles 150 mm
590 TBSC-P.III-08 Brass fancy handles 200 mm
591 TBSC-P.III-09 Brass fancy handles 250 mm
592 TBSC-P.III-10 Brass fancy handles 300 mm
593 TBSC-P.III-11 Brass fancy handles 450 mm
594 TBSC-P.III-12 Keyless lockset for toilet doors with CP or PC knob handles (complete set)
595 TBSC-P.III-13 Keyless lock set for toilet doors with brass knob handles
596 TBSC-P.III-14 Hard Nylon Window Handle
597 TBSC-P.III-15 Stainless Steel Door Handles 100 mm Long
598 TBSC-P.III-16 Stainless Steel Door Handles 125 mm Long
599 TBSC-P.III-17 Stainless Steel Door Handles 150 mm Long
600 TBSC-P.III-18 Stainless Steel Door Handles 200 mm Long
IV SUB-SECTION ALDROPS
601 TBSC-P.IV-01 Brass Aldrop (IS:2681) 300 mm long
602 TBSC-P.IV-02 Brass Aldrop (IS:2681) 350 mm long
603 TBSC-P.IV-03 Brass Aldrop (IS:2681) 450 mm long
604 TBSC-P.IV-04 Aluminium Aldrop (IS:2681) 200 mm long
605 TBSC-P.IV-05 Aluminium Aldrop (IS:2681) 250 mm long
606 TBSC-P.IV-06 Aluminium Aldrop (IS:2681) 300 mm long
607 TBSC-P.IV-07 MS-Powder Coated Aldrop (IS:2681) 200 mm long
608 TBSC-P.IV-08 MS-Powder Coated Aldrop (IS:2681) 250 mm long
609 TBSC-P.IV-09 MS-Powder Coated Aldrop (IS:2681) 300 mm long
610 TBSC-P.IV-10 Stainless Steel Aldrops (IS:15834) 200 mm long
611 TBSC-P.IV-11 Stainless Steel Aldrops (IS:15834) 250 mm long
612 TBSC-P.IV-12 Stainless Steel Aldrops (IS:15834) 300 mm long
V SUB-SECTION LATCHES
605 TBSC-P.V-01 Brass latch heavy 300 mm
606 TBSC-P.V-02 Brass latch heavy 350 mm
607 TBSC-P.V-03 Brass latch heavy 450 mm
608 TBSC-P.V-04 Aluminium Flat Latches: 200 mm long
609 TBSC-P.V-05 Aluminium Flat Latches: 250 mm long
610 TBSC-P.V-06 Aluminium Flat Latches: 300 mm long
611 TBSC-P.V-07 MS-Powder Coated Flat Latches: 250 mm long
612 TBSC-P.V-08 MS-Powder Coated Flat Latches: 300 mm long
VI SUB-SECTION DOOR CLOSURES
613 TBSC-P.VI-01 Providing and fixing Cast Iron Body Bottle Type Hydraulic Door Closer
(IS: 3564) with double speed adjustment, with necessary accessories and
screws etc. complete
614 TBSC-P.VI-02 Providing and fixing Aluminium Extruded Section Body Tubular Type Hydraulic Door
Closer (IS: 3564) with double speed adjustment with necessary accessories
and screws etc. complete (Type-1: for width of doors up to 700 mm)

615 TBSC-P.VI-03 Providing and fixing Aluminium Extruded Section Body Tubular Type Hydraulic
Door Closer (IS: 3564) with double speed adjustment with necessary
accessories and screws etc. complete (Type-2: for width of doors 701 to 850
mm)
616 TBSC-P.VI-04 Providing and fixing Aluminium Extruded Section Body Tubular Type Hydraulic Door
Closer (IS:3564) with double speed adjustment with necessary accessories and
screws etc. complete (Type-3: for width of doors 851 to 1000 mm)

VII SUB-SECTION FLOOR SPRINGS


617 TBSC-P.VII-01 Double action Stainless steel cover plate and cast body
iron floor spring (IS 6315- Table-1)
618 TBSC-P.VII-02 Double action Brass cover plate and cast brass body
floor spring (IS 6315- Table-1)
619 TBSC-P.VII-03 Providing and fixing double action brass cast hydraulic
floor spring (IS:6315-Table 1) for doors including cost
of cutting floors as required, embedding in floors and
S.S./ Brass cover plates with brass pivot and single piece
M.S. Sheet outer box with slide plate etc. complete (door
weight capacity up to 130 Kgs)

620 TBSC-P.VII-04 Providing and fixing double action brass cast hydraulic
floor spring (IS:6315-Table 1) for doors including cost
of cutting floors as required, embedding in floors and
S.S. cover plates with brass pivot and single piece M.S.
Sheet outer box with slide plate etc. complete (door
weight capacity up to 80 Kgs)

621 TBSC-P.VII-05 Providing of brass cast body Floor Spring IS: 6315 sleek
in size with the S.S. / Brass Cover plates of Length 320
mm x Breadth 130 mm size along with the Top Patch,
Bottom Patch, Door Lock and Pivot with Double
Cylinder etc. complete for Heavy duty Glass doors.
VIII SUB-SECTION MORTICE LOCKS
622 TBSC-P.VIII-01 Heavy duty mortice lock 6/7 levers (IS:2209) with PC or
CP handles complete set
623 TBSC-P.VIII-02 Heavy duty mortice lock 6/7 levers (IS:2209) with brass
heavy handles
IX SUB-SECTION OTHER ACCESSORIES
624 TBSC-P.IX-01 Brass Door Stoppers
625 TBSC-P.IX-02 MS-Powder Coated - Door Stoppers
626 TBSC-P.IX-03 Heavy duty Aluminium Door stopper
627 TBSC-P.IX-04 Rubber/ Nylon door stop bushes
628 TBSC-P.IX-05 Supply & fixing drapery rods (25.4 mm) 1" x 21 G
Powder coated with PVC rings
629 TBSC-P.IX-06 Supply & fixing drapery bracket - brass powder coated
630 TBSC-P.IX-07 Nylon rollers for sliding glasses/ alluminium windows
631 TBSC-P.IX-08 MS Z Hold fasts - 300 mm long of 40 x 40 x 5 mm ISA
632 TBSC-P.IX-09 Magnetic Catchers
Q SECTION CONSTRUCTION CHEMICALS & ADMIXTURES
Approved brands, area of application, dosage etc have been appended to
this SoR for the guidance for preparation of estimates only. However,
literature for usage/ application of construction/ water proofing
materials, epoxies etc, may be obtained from the manufacturers, while in
execution.
I SUB-SECTION PLASTICIZERS
633 TBSC-Q.I-01 Concrete Plasticizers and Water reducing admixture Conforming to IS:9103-1999

634 TBSC-Q.I-02 Early High Strength, High water retention, polycarboxylic plasticizers Conforming to
IS:9103-1999
635 TBSC-Q.I-03 High performance super plasticizer and water reducing
admixture Conforming to IS: 9103-1999
636 TBSC-Q.I-04 Super plasticizer for high range water reducing
admixture Conforming to IS: 9103-1999
637 TBSC-Q.I-05 Super plasticizer, high range water reducing and
retarding admixture complying with IS: 9103-1999
638 TBSC-Q.I-06 Plasticizer for accelerator for sprayed concrete
Conforming to IS: 9103-1999.
639 TBSC-Q.I-07 High Early Strength Concrete Admixture for Road Repairs
II SUB-SECTION WATER PROOFING COMPOUNDS
639 TBSC-Q.II-01 Integral Cement Waterproofing Liquid Conforming to IS: 2645-2003
640 TBSC-Q.II-02 High durable cementitious acrylic based waterproofing systems
641 TBSC-Q.II-03 Acrylic Polymer Elastomeric Cementitious Water proof Coatings
642 TBSC-Q.II-04 Single component, elastomeric waterproof membrane coating
643 TBSC-Q.II-05 Quick setting, rapid hardening and water proofing compound Conforming to
IS: I.S. 2645-2003
644 TBSC-Q.II-06 Highly Flexible Water proof Acrylic Elastomeric bituminous Blended Coatings
645 TBSC-Q.II-07 Two part system of fibre reinforced Acrylic Cementitious Water proofing coating.
646 TBSC-Q.II-08 High strength cellulose fibre reinforced acrylic elastomeric liquid membrane
waterproof coating -
647 TBSC-Q.II-09 High Strength Acrylic Penetrative U,V. Resistant concrete road top coatings.
648 TBSC-Q.II-10 High performance polyurethane blended with bituminous Membrane coating
( Complies with ASTM C - 836 )
649 TBSC-Q.II-11 Nano Technology water based transparent silicon water repellent
Providing and applying Brushbond ( two component acrylic polymer modified
elastomeric waterproofing membrane which consists of Brushbond powder and
Brushbond liquid acrylic emulsion) for a minimum 2mm thickness coating. (Work shall
be executed as per manufacturer’s specification and instructions.
III SUB-SECTION BONDING AGENTS/ ADHESIVES
645 TBSC-Q.III-01 Acrylic based Bonding adhesive
646 TBSC-Q.III-02 Styrene butadiene rubber based bonding agent
647 TBSC-Q.III-03 Two Parts system of Epoxy Bonding adhesive Conforming to ASTM-C 881
648 TBSC-Q.III-04 Liquid Polymer additive for cement & concrete mixes
649 TBSC-Q.III-05 Polymer cementitious additive for fixing tiles/ stones etc
650 TBSC-Q.III-06 Highly multi purpose Roads Grade concrete bonding agent
IV SUB-SECTION ANTI-CORROSIVE AGENTS
648 TBSC-Q.IV-01 Acrylic based Anti corrosive coating
649 TBSC-Q.IV-02 Rust converter –rust encapsulating coating for steel
650 TBSC-Q.IV-03 High range of reinforcement / steel protector against
corrosion zinc rich epoxy resin primer
651 TBSC-Q.IV-04 Anti corrosion CRPPC (Corrosion Resistant) inhibitive admixture
V SUB-SECTION GROUTS
652 TBSC-Q.V-01 High Power Polyester Resin Anchor Grout Conforming to ASTM-827
653 TBSC-Q.V-02 Non-shrink Free flow high strength precision grout Conforming to BS 1881 Part
1161983.
654 TBSC-Q.V-03 Low viscosity Epoxy resin injection grout
655 TBSC-Q.V-04 Three component epoxy grout Conforming to IS: ASTM 827 (Three components)
656 TBSC-Q.V-05 Expansive acqua -reactive water barrier and grouting
VI SUB-SECTION MISCELLANEOUS CHEMICALS
656 TBSC-Q.VI-01 Mould / Shutter releasing oil
657 TBSC-Q.VI-02 Non oxidizing, heavy duty metallic Floor Hardeners
658 TBSC-Q.VI-03 Non-metallic Floor Hardeners
659 TBSC-Q.VI-04 High Strength, Non shrink Micro Concrete for structural repair product.
660 TBSC-Q.VI-05 Structural graded polymer modified reinstatement concrete / mortar(Two Part System)

661 TBSC-Q.VI-06 Three Component high performance elastomeric mortar.


662 TBSC-Q.VI-07 Surface treatment crystalline product.
663 TBSC-Q.VI-08 Polyurethane Sealant. 600 ml tube
664 TBSC-Q.VI-09 Polysulphide Sealant.
665 TBSC-Q.VI-10 Acrylic Latex caulking compound.
666 TBSC-Q.VI-11 Fast setting cement based plugging compound
667 TBSC-Q.VI-12 Highly Flexible High Range Polyurethane surface coatings
668 TBSC-Q.VI-13 Coal Tar Epoxy
669 TBSC-Q.VI-14 Water Based Acrylic Blended High power curing compound
670 TBSC-Q.VI-15 Bituminous hot sealing compound
671 TBSC-Q.VI-16 Bitumen solution primer coating.
672 TBSC-Q.VI-17 Air Entraining Agent Conforming to IS: 9103-99
673 TBSC-Q.VI-18 Chlorpyriphos/ Lindane emulsifiable concentrate of 20%
674 TBSC-Q.VI-19 Multifilament Polypropylene fibers of 6/12/18 mm length for Plastering, Screeds, all
Precasting items
675 TBSC-Q.VI-20 Macro Synthetic fibers of 45mm length for CC Roads, Ground Supported Slabs,
Pavements, Sprayed Concrete,Tunnel linings, Mining
676 TBSC-Q.VI-21 Steel Fibers of 35 mm length for CC Roads, Ground Supported Slabs, Pavements,
Sprayed Concrete,Tunnel linings, Mining
677 TBSC-Q.VI-22 High strength, Acrylic blended dry colour mortar /concrete
VII SUB-SECTION REPAIRING & TREATMENT WORKS
674 TBSC-Q.VII-01 Providing Tar Felting roof repair with approved bran Tar Felt duly applying one
coat of appropriate grade of bitumen in hot condition @ 0.2 Kg/1 Sqm of roof
area, fixing tar felt (Conforming to IS 1322-1972 specification), applying
second coat of appropriate grade of hot bitumen at 1.20 Kg / 1 Sqm of roof
area and spreading course aggregate (sand) at 0.063 Cum
per 1 Sqm of roof area finished item.

675 TBSC-Q.VII-02 Providing waterproofing treatment by supplying and fixing synthetic


membrane felt of 1.50 mm thickness, 2.25 Kg per Sq. Mtr. duly applying one
coat of Bituminous Emulsion, first coat of bituminous grade 85/25, fix
waterproofing membrane, applying second coat of bitumen grade 90/15 after
sealing all the joints and abutments with a Gas torch and applying one coat of
bituminous aluminum paint for heat resistance for finished item.
676 TBSC-Q.VII-03 Providing and laying of 3mm thick app modified
bitumen membrane treatment to the terrace duly
[1]removing of existing tar felt. [2]cleaning of the
surface from dirt, dust and other contaminations.
[3]application of one coat of Bitumen primer
[4]providing and laying of 3mm thick APP Modified
Bitumen Membrane with 100 mm overlap fixing with
butane torch.

677 TBSC-Q.VII-04 Providing specialized high performance acrylic


polymer modified elastomeric cementitious
waterproof coating to the terrace / walls / internal
portion of the bathroom & toilets / internal portion of
the water tanks duly cleaning of the surface from dirt,
dust and other contaminations, providing and
application of Two coats of High performance Acrylic
polymer modified Elastomeric cementitious
waterproof coating ( 1.8 Sq. Mtr. / Kg /Each Coat )

678 TBSC-Q.VII-05 Providing specialized high build, elastomeric acrylic


bituminous blended coating to the terrace / internal
portion of the bathroom / toilets / basements / roofing
duly a). Cleaning of the surface. b). Applying primer
coat of High Build, Elastomeric Acrylic Bituminous
Blended Coating c). Application of Two coats of High
Build, Elastomeric Acrylic Bituminous Blended Coating

679 TBSC-Q.VII-06 Providing specialized high solid, cold applied, acrylic


elastomeric liquid membrane coating treatment to the
terrace / roofing with fiber mesh / geo fabric duly a.
Cleaning of the surface from dirt, dust and other
contaminations. b. Applying one coat of High solid, Cold
applied, Acrylic Elastomeric Liquid Membrane coating c.
immediately, Application of one coat of High solid, Cold
applied, Acrylic Elastomeric Liquid Membrane coating e.
Laying of fiber mesh 40 GSM / Geo fabric 40 GSM on the
surface. f. Over the Fiber mesh, Application of two coats
of High solid, cold applied, Acrylic Elastomeric Liquid
Membrane Coating

680 TBSC-Q.VII-07 Providing specialized polysulphide sealant treatment to


the expansion joints (Size : 25mm x 12mm) duly a].
Chipping and removing of existing covering on
expansion joints b]. Cleaning of the surface from dirt,
dust and other contaminations c].Application of one coat
of - High performance specially designed SBR latex
polymer based bonding agent d]. Providing and
application of Acrylic Polymer modified reinstatement
concrete /mortar to the damaged edges of joint and
making the groove. e]. Providing and fixing of masking
tape on top of the joint both sides f]. Providing and
fixing of Back up support material of Backer rod to leave
the depth of 12mm on the joint g]. Providing and
application of one coat of polysulphide primer on inner
edges of Joint. h]. Providing and application of Two part
Polysulphide sealant to a width of 25mm and 12mm
depth with putty knife and neat finish i]. Removing of
masking tape and providing and application of two coats
of Acrylic elastomeric cementitious coating

681 TBSC-Q.VII-08 Pressure grouting the drilled holes with neat cement
slurry or with approved epoxy bonding agent using
pump
682 TBSC-Q.VII-09 Providing multi-coloured silicon fluorocarbon spray coating of thickness 1mm for
exterior & interior wall finishes to give Natural Granite appearance
comprising of 4 coats including application of primer, waterproof coat, Multi colour
texture & finally UV resistant with repellent clear coat of low VOC, non-
toxic, Green Building compliant material

683 TBSC-Q.VII-10 Providing and applying epoxy based anti skid coat over existing RCC/Concrete
flooring surfaces of 2mm thickness for wear & tear protection in three part
applications containing low solvent-coloured, epoxy resin based coating with
thyrotrophic properties specially formulated for application in Car Parks
having Mechanical / Physical Properties such as 1. Abrasion Resistance ~
0.8mm thickness loss (According to IS 1237 – 1980 and IS 9162 - 1979) 2.
Chemical Resistance to many chemicals 3.Thermal Resistance Exposure with Dry
heat Permanent +50°C

684 TBSC-Q.VII-11 Providing and applying epoxy resin based self levelling Conductive
Floor System of 2mm thick Antistatic (ESD) Flooring System comprising of
1 coat of Primer followed by Application of copper tape and 1 layer of SL
Conductive Undercoat and 1 layer of SL Conductive Top coat with Compressive
strength after 7 days at +30° C: 50 N/mm2 and Flexural strength after 7
days at +30° C: approx. 5N/mm2 and Tensile strength after 7 days at +30°
C: 16 N/mm2 with a Surface resistance When measured for surface
resistance in accordance with BS 2050: 1978 (A-1984) and DIN EN 1081, the
static Conductive topping including under coat shall be less than 25k Ω.

685 TBSC-Q.VII-12 Providing and applying food grade epoxy based water proof coat over
existing RCC/Concrete flooring surfaces in three part applications containing low
solvent-coloured, epoxy resin based coating with low VOC properties specially
formulated for food grade application for potable water storage tanks in
ambient temperatures

VIII SUB-SECTION EXPANSION JOINTS


682 TBSC-Q.VIII-01 Supply of high performance expansion joint filler board
conforming to IS: 1838 - 18 mm THICK
683 TBSC-Q.VIII-02 Supply of high performance expansion joint filler board
conforming to IS: 1838 - 20 mm THICK
684 TBSC-Q.VIII-03 Supply of high performance expansion joint filler board
conforming to IS: 1838 - 25 mm THICK
685 TBSC-Q.VIII-04 Supply of expansion joint filler board conforming to IS:
1838 for buildings, columns, beams and slabs 20 mm
THICK
686 TBSC-Q.VIII-05 Supply of expansion joint filler board conforming to IS:
1838 for buildings, columns, beams and slabs 25 mm
THICK
687 TBSC-Q.VIII-06 Supply of expansion joint filler board conforming to IS:
1838 for buildings, columns, beams and slabs 50 mm
THICK
688 TBSC-Q.VIII-07 Supply of back up to cold applied gun-grade
polysulphide sealant conforming to IS:11433 (Part-1) in
construction and longitudinal joint - 10 mm OD
689 TBSC-Q.VIII-08 Supply of back up to cold applied gun-grade
polysulphide sealant conforming to IS:11433 (Part-1) in
construction and longitudinal joint - 12 mm OD
690 TBSC-Q.VIII-09 Supply of back up to cold applied gun-grade
polysulphide sealant conforming to IS:11433 (Part-1) in
construction and longitudinal joint - 15 mm OD
691 TBSC-Q.VIII-10 Supply of back up to cold applied gun-grade
polysulphide sealant conforming to IS:11433 (Part-1) in
construction and longitudinal joint - 20 mm OD
692 TBSC-Q.VIII-11 Supply of back up to cold applied gun-grade
polysulphide sealant conforming to IS:11433 (Part-1) in
construction and longitudinal joint - 25 mm OD

R SECTION MISCELLANEOUS ITEMS


693 TBSC-R.I-01 Supply of White Cement conforming to IS:8042-1989
694 TBSC-R.I-02 Supply of well burnt cinder aggregates as per IS: 2686-
1977
695 TBSC-R.I-03 Supply of Aluminium anodized Sections for Doors,
partitions, windows, Ventilators (including annodization cost) conforming to IS:
11857 - 1986
696 TBSC-R.I-04 Providing Powder coating as per IS:13871-1993 or
colour annodization as per IS:7088-1973 - on any
aluminium or mild steel section
697 TBSC-R.I-05 Providing hot dip galvanizing to any steel section as per
IS:2629-1985
698 TBSC-R.I-06 Supply of Clear Silicone Sealant (Glass Glue Sealant) of
Gun Applicator grade
699 TBSC-R.I-07 Supply of Sun Control film to the glazed windows
partition including labour charges.
700 TBSC-R.I-08 Supply of Aluminium Venetian Blinds horizontal 25.4
mm wide with all accessories.
701 TBSC-R.I-09 Supply of Aluminium Venetian Blinds horizontal 20.0
mm wide with all accessories.
702 TBSC-R.I-10 Supply of Venetian blinds Vertical blinds 100 mm wide
with all accessories.
703 TBSC-R.I-11 Supply of Rubber Beading for glass fixing
704 TBSC-R.I-12 Supply of Soft Brush for painting, varnishing etc
705 TBSC-R.I-13 Supply of Wire Brush for scraping
706 TBSC-R.I-14 Providing and fixing PVC door cladding to the flush
doors shutters, for the new doors it shall be pasted with
synthetic glue or nailed to the old doors. complete as per
direction of Engineer –in – charge, manufacturers
specification and drawing - 1 mm thick
707 TBSC-R.I-15 Providing and fixing PVC door cladding to the flush
doors shutters, for the new doors it shall be pasted with
Synthetic glue SSR 998 or nailed to the old doors.
complete as per direction of Engineer – in – charge,
manufacturers specification and drawing - 1.5 mm thick
708 TBSC-R.I-16 Providing and fixing PVC door cladding to the flush
doors shutters, for the new doors it shall be pasted with
Synthetic glue SSR 998 or nailed to the old doors. complete as per
direction of Engineer – in – charge, manufacturers specification and drawing -
2.0 mm thick
709 TBSC-R.I-17 Supplying and fixing aluminium composite cladding with skin material 0.25 mm
thick aluminium sheet cover material natural polyethylene aluminium cladding panel
fixed witt extruded aluminium basis frame (50x25x1.5mm) angle cleats,
weather sealants, rivets, GI brackets all as approved, using suitable bolts
on structural steel work including necessary accessories complete in all
respects including labour charges etc., complete for finished item of work but
excluding cost of structural steel fabrication, scaffolding charges, if any, ACP
Cladding - 3 mm thick
710 TBSC-R.I-18 Supplying and fixing aluminium composite claddingwith skin material 0.25 mm thick
aluminium sheet covermaterial natural polyethylene aluminium cladding panel fixed
with extruded aluminium basis frame (50x25x1.5mm) angle cleats, weather
sealants, rivets, GI brackets all as approved, using suitable bolts on
structural steel work including necessary accessories complete in all respects
including all labour charges etc., complete for finished item of work but
excluding cost of structural steel abrication, scaffolding charges, if any, ACP Cladding
- 4 mm thick

711 TBSC-R.I-19 Supplying and fixing aluminium composite cladding


with skin material 0.5 mm thick aluminium sheet cover
material natural polyethylene aluminium cladding panel fixed with extruded
aluminium basis frame (50x25x1.5mm) angle cleats, weather sealants, rivets, GI
brackets all as approved, using suitable bolts on structural steel work
including necessary accessories complete in all respects including all labour
charges etc., complete for finished item of work but excluding cost of structural
steel fabrication, scaffolding charges, if any, ACP Cladding - 4 mm thick

712 TBSC-R.I-20 S&F of pre-cast RCC Grills of any design of 25 mm thick


manufactured with M-30 grade of concrete using vibro-
compaction process using joint less FRP moulds to
achieve shuttering finish and adequately reinforced for
long use and to prevent damage during handling,
transportation & erection etc.,

713 TBSC-R.I-21 S&F of pre-cast RCC Grills of any design of 40 mm thick


manufactured with M-30 grade of concrete using vibro-
compaction process using joint less FRP moulds to
achieve shuttering finish and adequately reinforced for
long use and to prevent damage during handling,
transportation & erection etc.,

714 TBSC-R.I-22 S&F of pre-cast RCC Grills of any design of 50 mm thick


manufactured with M-30 grade of concrete using vibro-
compaction process using joint less FRP moulds to
achieve shuttering finish and adequately reinforced for
long use and to prevent damage during handling,
transportation & erection etc.,

715 TBSC-R.I-23 Supply of Aluminium sheet 24 Gauge


716 TBSC-R.I-24 Supply of 7.5mm thick Aluminium Grill (as approved by
the department) 3.58 Kg/1 Sqm
717 Design, fabrication & supply of light weight pre
engineered buildings for a maximum span of 9 meters
with 50 x 50 x 2.8 mm M.S hollow square tubes for
columns, trusses & purlins walls with sandwich panels
made up of 2 Nos 10mm thick cement bonded particle/
fibre boards with 25mm thick 12 kg/cum density
expanded polystyrene in between encased in 1.25 mm
thick 24x7x26 mm ‘W’ tracks in bottom & top and ‘H’
section for sides with doors, windows & ventilators,
roofing with 26 gauge pre painted profiled sheets fixed
with self tapping/ drilling screws, painting with enamel
paint for steel items, OBD for interiors and ace for
exteriors & providing base plates, templates & anchor
bolts along with civil foundation designs & drawings for
the finished item of work

718 TBSC-R.I-25 Steel Structure: - Structure is made up of 50x50x2.8


m/33x66x2.8mm thick hollow M.S. sections for -
Columns and purlins
719 TBSC-R.I-26 Steel Structure: - Structure is made up of 50x50x2.8
m/33x66x2.8mm thick hollow M.S. sections for
Trusses
720 TBSC-R.I-27 10 mm thick 200 X 200 mm M.S Plates for base
plates, 250mm long 12mm anchor bolts with plate
washer and nuts complete with one coat of Asian or
equivalent red oxide paint
721 TBSC-R.I-28 Sandwich panels: Sandwich panels of 50 mm thick
with 25 mm Thermocol of 12 kg / cum, fixed in
betw0een 2 Nos 10 mm cement bonded wood
particle / fibre boards properly fixed together with
30 mmx30mmx30mm wood pieces along width &
length wherever necessary

722 TBSC-R.I-29 U' Tracks & 'H' Section:- Bottom & Top 'U' Tracks are
made of 1.25 mm thick 120 GSM G.I. Sheet of
size24x51x26 mm size.
723 TBSC-R.I-30 G I ‘H’ Section is made up of forming width of 275
mm single sheet roll formed in the shape of “H”
section without any welding joint. 40mm width for
flanges and 51 mm for web to hold 50 mm Sandwich
panel
724 TBSC-R.I-31 Sandwich Panel joinery is made up of couplers or
equivalent made from 0.6 mm G.I. roll formed section
to hold 2 Nos of 10 mm board on both sides with 25
mm Thermocol in between.
725 TBSC-R.I-32 150 mm X 150 mm X 2.0 mm size M. S. Corner Cover
Plate
726 TBSC-R.I-33 Window:- windows are made up of 51 x51 mm step
'U' section made from 1.25 thick MS Cold rolled Steel
Sheet and Windows Shutters & Grill are made of
48x25mm mm size pre painted section with 4 mm
glass complete with necessary hardware. Grills are
made from 8 mm square rod at 100 mm spacing.

727 TBSC-R.I-34 Door Frames :-51 X 51 Stepped ' U' section made from 1.25 mm thick C.R.
section with a 32 mm rebate for 30 mm flush door and Door Shutters with 30 mm
thick block board / flush doors with boiling water proof plywood complete with
necessary Hard ware.
TBSC-R.I-35 Ventilators:- Ventilators are made of 51x51 mm step
728 'U' section made From 1.25 mm thick C.R. sheet with
fixed louvers and glass.
729 TBSC-R.I-36 Painting:-1) Steel structure is to be painted with 2
coats of Grade I enamel paint.
730 TBSC-R.I-37 2) Exterior walls are painted with one coast of
primer and 2 coats of exterior emulsion paint .
731 TBSC-R.I-38 3) Interiors are painted with 1+2 coat of O.B.D.
TBSC-R.I-39 Toilets: - Toilets are provided as per plan with a
provision for fixing the wash basin, W.C. etc only is
732 made with M.S. steel section secured to the walls
with toilet bracket provision excluding cost of WC/
Wash basin etc
TBSC-R.I-40 Sun shades: - Sun shades will be provided wherever
necessary with 300 mm more than the width of
window. 25x25 mm angle frame to cover 450 mm in
733 the front and the sides. 10mm cement bonded
particle board will be fixed on the frame work and
sealed with green paste or equivalent.
TBSC-R.I-41 Roofing: - Roofing will be provided with 0.5mm thick
galvanized / pre painted G.I. profiled sheets fixed to
the purlins with 14 size self drilling screws with
734 neoprene washer. Side laps are stitched with self
tapping / drilling screws. End laps are to be sealed
with 25x3 mm Butyl tape. The sheets are provided
with anti capillary grove.

735 TBSC-R.I-42 Preparing gabions with jungle wood


736 TBSC-R.I-43 Planting plants
737 TBSC-R.I-44 Pruning plants
738 TBSC-R.I-45 Maintaining avenues including fencing, weeding,
mulching, watering etc per plant.
TBSC-R.I-46 Maintaining avenues including fencing, weeding,
mulching, watering etc per plant When scattered in
739 hot weather with extra conveyance from March to
June
740 TBSC-R.I-47 Hoisting or lowering of slab
741 TBSC-R.I-48 Drilling holes in hard rock surfaces up to 18mm Diameter
742 TBSC-R.I-49 Drilling holes in hard rock above 18mm Diameter
743 TBSC-R.I-50 Making holes up to 18mm Diameter in RCC/ any
stones up to 50 mm thick
TBSC-R.I-51 Making holes above 18mm Diameter in RCC/ any
stones above 50 mm thick
1 TBSC-R.I-50 Supplying EPDM Gasket for windows panes to the
PPS shutter
2 TBSC-R.I-51 Supplying SS 304 Grade Heavy Duty Pivot Hinges for
windows
S SECTION MACHINERY & OTHER HIRE CHARGES
742 TBSC-S.I-01 Machine charges of rubbing/ polishing floor
743 TBSC-S.I-02 Power Saw Cutter - Hand Operated - Hire charges
744 TBSC-S.I-03 Power Drill - Hand Operated - Hire Charges
745 TBSC-S.I-04 Grinding Mortar (Special Grinding)
746 TBSC-S.I-05 Casuarinas Balli Props - 3" to 4" Diameter - 12'-0"
Height
747 TBSC-S.I-06 Casuarinas Balli Props - 4" to 8" Diameter - 20'-0"
Height
748 TBSC-S.I-07 Wall Plate Brackets / beam bottom supports
749 TBSC-S.I-08 Wedge Plate fixture
750 TBSC-S.I-09 Runner beams of approximately 4" x 4" size
751 TBSC-S.I-10 Steel Plates for form works
752 TBSC-S.I-11 Scaffolding Pipes & Centering accessories
753 TBSC-S.I-12 Scaffold Boards - Bamboo scaffolds - Bamboos - 8'0" long
754 TBSC-S.I-13 Hire charges for stationary Concrete pump conforming
to IS 21573 Part-1: 2006 to deliver the fresh green
concrete
755 TBSC-S.I-14 Concrete delivery pipes conforming to IS 15947 Part I:
2012 to be connected to the pump to delivery point
(150 mm Diameter) hire charges per 10 RM

T SECTION LABOUR CHARGES


756 TBSC-T.I-01 Bailing out water for earth work excavation /concrete
for foundation below water level. (For building items
only) - Other than sandy soil - 0.0 M to 1.0 M
757 TBSC-T.I-02 Bailing out water for earth work excavation /concrete
for foundation below water level. (For building items
only) - Other than sandy soil - 1.0 M to 2.0 M
758 TBSC-T.I-03 Bailing out water for earth work excavation /concrete
for foundation below water level. (For building items
only) - Other than sandy soil - 2.0 M to 3.0 M
759 TBSC-T.I-04 Bailing out water for earth work excavation / for
concrete foundation below water level. (For building
items only) Sandy soil - 0.0 M to 1.0 M
760 TBSC-T.I-05 Bailing out water for earth work excavation /for
concrete foundation below water level. (For building
items only) Sandy soil - 1.0 M to 2.0 M
761 TBSC-T.I-06 Bailing out water for earth work excavation /concrete
for foundation below water level. (For building items
only) Sandy soil - 2.0 M to 3.0 M
762 TBSC-T.I-07 Labour charges for making, fabricating office racks, cup-board shutters etc with ply-
wood/ MDF sheets,decolam/ veneer laminations including fixing cutting,making,
assembling, fixing hinges, fixing fixtures, fixing locks, pasting sheets/ laminations
fixing in position with necessary screws excluding cost of materials, accessories,
fittings
763 TBSC-T.I-08 Labour charges for making, fabricating kitchen
furniture, cup-boards with shutters, box cup-boards,
box racks, work-station furniture etc with ply-wood/
MDF sheets, decolam/ veneer laminations including
fixing cutting, making, assembling, fixing hinges, fixing
fixtures, fixing locks, pasting sheets/ laminations fixing
in position with necessary screws excluding cost of
materials, accessories, fittings

764 TBSC-T.I-09 Labour charges for making, fabricating any aluminium


door/ window/ glazing including fixing cutting, making,
assembling, fixing hinges, fixing fixtures, fixing locks,
fixing in position with necessary screws excluding cost
of materials, accessories, fittings excluding cost of
annodization

765 TBSC-T.I-10 Rounding the edges of Kadapa / Shahabad stone slabs of


any thickness including polishing the same
766 TBSC-T.I-11 Half Rounding the edges of Marble/ Granite stone slabs
of all thicknesses including polishing the same.
767 TBSC-T.I-12 Full Rounding the edges of Marble/ Granite stone slabs
of all thicknesses including polishing the same.
768 TBSC-T.I-13 Machine Cutting charges - for Marble/ Granite slabs up
to 50 mm thick by mechanical device.
769 TBSC-T.I-14 Flat nosing to Kadapa/ Shahabad stone slabs of any
thick
770 TBSC-T.I-15 Grooves 2-3 mm
771 TBSC-T.I-16 Labour charges for fabricating steel works like Window
Grills, Compound Wall Grills, Iron Doors, Windows
including cost of welding rods, power charges, excluding
cost of fixing in position
772 TBSC-T.I-17 Labour charges for fixing Iron Doors, Iron Windows and
Window Grills in position
773 TBSC-T.I-18 Labour charges for fabricating all structural steel works
like heavy steel works like Trusses, Stanchions, Heavy
Beams and Girders including cost of welding rods,
power charges, etc excluding cost of fixing in position
774 TBSC-T.I-19 Labour charges for erecting & fixing all structural steel
works like heavy iron grills, Trusses, Stanchions, Heavy
Beams and Girders erecting in position and fixing by
using chain pulley blocks, Derek pole arrangements and
cranes etc., complete in position
775 TBSC-T.I-20 Labour charges for Fabrication of stainless steel railing
works using stainless steel welding rods including
buffing, polishing, lacquer finishing, to present seamless finish
776 TBSC-T.I-21 Labour charges for Fabrication of stainless steel sheet
cladding works using stainless steel welding rods
including buffing, polishing, lacquer finishing, to present
seamless finish
777 TBSC-T.I-22 Labour charges for Glass designing works on any
thickness of Glass including fixing at site - Etching works
778 TBSC-T.I-23 Labour charges for Glass designing works on any
thickness of Glass including fixing at site - Reverse
Etching work
779 TBSC-T.I-24 Labour charges for Glass designing works on any
thickness of Glass including fixing at site - Acid wash
works
780 TBSC-T.I-25 Labour charges for fixing Flush door shutters of any
thickness to the existing door frame including fixing the
fixtures to the door shutter excluding cost of shutter
781 TBSC-T.I-26 Labour charges for fixing glass panes of any thickness to
the existing door / window panes including fixing the
beading excluding cost of beading
782 TBSC-T.I-27 Labour charges for wrought and put up including fixing
in position for Teak wood Fully panelled doors external
or internal including frame
783 TBSC-T.I-28 Labour charges for wrought and put up including fixing
in position for Teak wood Glazed and panelled doors
including fixing glass including frame
784 TBSC-T.I-29 Labour charges for wrought and put up including fixing
in position for Teak wood Framed and planked doors
including frame
785 TBSC-T.I-30 Labour charges for wrought and put up including fixing
in position for Teak wood Ledged, braced and planked
doors including frame
786 TBSC-T.I-31 Labour charges for wrought and put up including fixing
in position for Teak wood Flush type door shutter
including frame
787 TBSC-T.I-32 Labour charges for wrought and put up including fixing in position for Teak wood
Windows glazed including outer frame and shutter frame
788 TBSC-T.I-33 Labour charges for wrought and put up including fixing in position for Teak wood
Windows panelled including outer frame and shutter frame
789 TBSC-T.I-34 Labour charges for wrought and put up including fixing in position for Teak wood
Windows ledged, braced and planked including outer frame
790 TBSC-T.I-35 Labour charges for wrought and put up including fixing in position for Teak wood
Windows framed and planked including outer frame and shutter frame
791 TBSC-T.I-36 Labour charges for wrought and put up including fixing in position for Teak wood
Ventilators glazed, fixed with double frame with wire netting including frame
792 TBSC-T.I-37 Labour charges for wrought and put up including fixing in position for Teak
wood Swing ventilators glazed including outer frame and shutter frame
793 TBSC-T.I-38 Labour charges for wrought and put up including fixing in position for Teak wood
Weld mesh doors and windows including outer frame and shutter frame
794 TBSC-T.I-39 Labour charges for wrought and put up including fixing in position for Teak wood
G.I or .AC sheet door & windows including outer frame and shutter frame
795 TBSC-T.I-40 Labour charges for wrought and put up including fixing in position for Other
than teakwood Fully panelled doors external or internal including frame
796 TBSC-T.I-41 Labour charges for wrought and put up including fixing in position for Other
than teakwood Glazed and panelled doors including fixing glass including frame
797 TBSC-T.I-42 Labour charges for wrought and put up including fixing in position for Other than
teakwood Framed and planked doors including frame
798 TBSC-T.I-43 Labour charges for wrought and put up including fixing in position for Other than
teakwood Ledged, braced and planked doors including frame
799 TBSC-T.I-44 Labour charges for wrought and put up including fixing in position for Other than
teakwood Flush type door shutter including frame
800 TBSC-T.I-45 Labour charges for wrought and put up including fixing in position for Other than
teakwood Windows glazed including outer frame and shutter frame
801 TBSC-T.I-46 Labour charges for wrought and put up including fixing in position for Other than
teakwood Windows panelled including outer frame and shutter frame
802 TBSC-T.I-47 Labour charges for wrought and put up including fixing in position for Other than
teakwood Windows ledged, braced and planked including outer frame
803 TBSC-T.I-48 Labour charges for wrought and put up including fixing in position for Other than
teakwood Windows framed and planked including outer frame and shutter frame
804 TBSC-T.I-49 Labour charges for wrought and put up including fixing in position for Other than
teakwood Ventilators glazed, fixed with double frame with wire netting including frame

805 TBSC-T.I-50 Labour charges for wrought and put up including fixing in position for Other than
teakwood Swing ventilators glazed including outer frame and shutter frame
806 TBSC-T.I-51 Labour charges for wrought and put up including fixing in position for Other than
teakwood Weld mesh doors and windows including outer frame and shutter frame

807 TBSC-T.I-52 Labour charges for wrought and put up including fixing in position for Other than
teakwood G.I or .AC sheet door & windows including outer frame and
shutter frame
808 TBSC-T.I-53 Dressing faces of granite stone (double line dressing)
809 TBSC-T.I-54 Dressing faces of other than granite stone(double line dressing)
820 TBSC-T.I-55 Labour charges for removing and refixing with complete servicing of the MS Windows

U SECTION DISMANTLING
810 TBSC-U.I-01 Stone masonry in cement mortar
811 TBSC-U.I-02 Terracing work in roofs or floors
812 TBSC-U.I-03 Flat stones in roof or floors including lifting
813 TBSC-U.I-04 Pan tiled or Mangalore tiled roof without roof timbers.
814 TBSC-U.I-05 Flat and pan tiles or Mangalore tiles over flat tiles without roof timbers
815 TBSC-U.I-06 Wrought and framed timber in roofs or floors
816 TBSC-U.I-07 Old lime mortar plaster
817 TBSC-U.I-08 Old cement mortar plaster
818 TBSC-U.I-09 Dry rough stone revetment for aprons and stacking within 40 M lead
819 TBSC-U.I-10 Revetment for aprons and stacking grouted within 40 lead
820 TBSC-U.I-11 Kadapa slabs or Shahabad stone slabs flooring on sand bed
821 TBSC-U.I-12 Through scraping of old plastered surface
822 TBSC-U.I-13 Washing of plastered surface with soap, soda and water (or with soda lime and
water)
823 TBSC-U.I-14 Clean removal of lime plaster from walls and raking out joints 20 mm deep or from
terraced roof and raking out joints up to 50 mm deep
824 TBSC-U.I-15 Clean removal of cement plaster from walls and raking out joints 20 mm deep or
from terraced roof and raking out joints from 50 mm to 100 mm deep
S - SoR : 2018 - 2019

CIVIL ITEMS
SS Rate for 2018-
19

Each
5.70

Each
6.70

Each
25.00

Each
23.00

Each
20.00

Each
14.00

Each
8.00

Each
15.00

Each
12.00

Each
24.00

Each
19.00

Each
20.00

Each
11.00

Each
6.00

Each
12.00

Each
11.00
Each
47.00

Each
69.00

Each
93.00

Each
106.00

Sqm 95.00
Sqm 123.00
Sqm
164.00
Sqm 95.00
Sqm 110.00
Sqm 137.00
Sqm 164.00
Sqm
382.00
Sqm
273.00

Sqm
661.00
Sqm
534.00
Sqm
907.00

Sqm 432.00

Sqm
3118.00
Sqm
2709.00
Sqm 2303.00
Sqm 1057.00

Sqm
300.00
Sqm
310.00

Sqm
485.00

Sqm
485.00

Sqm

Sqm
421.00

Sqm
421.00

Sqm
500.00

Sqm
550.00

Sqm
600.00

Sqm
700.00

Sqm

650.00

Sqm

800.00

Sqm

1000.00
Sqm

750.00

Sqm

Sqm

Sqm

Sqm

Sqm

Sqm
300.00

Sqm
400.00

Sqm
550.00

Sqm

550.00

Sqm

500.00

Sqm

500.00

Sqm

550.00
Sqm

650.00

Sqm

Sqm

Sqm

Sqm
300.00

Sqm
152.00
Sqm
317.00

Sqm
160.00

Sqm
633.00

Sqm
320.00

Sqm

Sqm

Sqm

Sqm
550.00

Sqm
480.00

Sqm
520.00
Sqm

Sqm
261.00

Sqm
278.00

Sqm
285.00

Sqm
245.00

Sqm
258.00

Sqm
261.00

Sqm
274.00

Sqm
285.00

Sqm
300.00

Sqm
427.00

Sqm
449.00

Sqm
304.00

Sqm
328.00

Sqm
470.00

Sqm
518.00

Sqm
589.00
Sqm
181.00

Sqm
771.00

Sqm
528.00

Sqm
383.00

Cum 72620.00
Cum 80689.00
Cum 88759.00
Cum 1,45,240.00

Cum 1,25,068.00
Cum 1,33,137.00
Cum 1,41,206.00
Cum 1,57,344.00

Cum 1,71,857.00
Cum 1,76,765.00
Cum 1,85,920.00
Cum 2,01,319.00

Cum 46071.00
Cum 66803.00

Cum 44785.00
Cum 59715.00

Sqm 220.00
Sqm 158.00
Sqm 164.00
Kg
60.00
Sqm

387.00
Sqm

377.00

Sqm

339.00

Sqm

319.00

Rmt
260.00

Rmt
232.00

Sqm
300.00
Sqm
380.00
Sqm
1276.00
Rmt
127.00
Each 5.00
Each 6.00
Each 6.00
Each 10.00
Each 2.00
Each 2.00
Each
2.00

Sqm

3890.00

Sqm

3403.00
Sqm
160.00
Sqm
160.00
Sqm
160.00
Sqm
218.00
Sqm
218.00
Sqm
218.00
Sqm
249.00
Sqm
249.00
Sqm
249.00
Sqm 19.00
Kg 61.00
Kg 61.00
Kg 61.00

Kg
90.00
Kg
90.00
Sqm 236.00
Sqm
519.00
Sqm
411.00
Sqm
351.00
Sqm
261.00
Sqm
626.00
Sqm
519.00
Sqm
428.00
Sqm
334.00

Kg
387.00
Sqm 522.00

Sqm 400.00
Sqm 507.00
Sqm 629.00
Sqm 845.00
Sqm 890.00
Sqm 1067.00

Sqm 300.00
Sqm 390.00

Sqm 467.00
Sqm 584.00
Sqm 700.00
Sqm 1002.00
Sqm 1168.00
Sqm 1402.00

Sqm 539.00
Sqm 678.00

Sqm 812.00
Sqm 938.00
Sqm 1251.00
Sqm 1500.00
Sqm 1749.00

Kg 150.00
Kg 191.00
Kg 41.00
Kg
64.00

liter 129.00
liter 185.00
liter 144.00
Kg 144.00
Kg 144.00
Kg 103.00
liter 144.00
liter 101.00
liter 58.00
liter 133.00
liter 272.00
liter 188.00
Kg 572.00
Kg 224.00
liter 516.00

Kg 22.00
Kg 43.00
Kg 82.00
Kg 51.00

liter
195.00
liter
204.00
liter
225.00

liter
245.00
liter
430.00

liter
251.00
liter
191.00

Kg
37.00

Kg
47.00

liter 317.00
liter 645.00
liter 788.00
liter 258.00

Sqm 613.00
Sqm 696.00
Sqm 806.00
Sqm 914.00
Sqm 1519.00
Sqm 706.00
Sqm 806.00
Sqm 933.00
Sqm 1033.00
Sqm 1941.00

Sqm 229.00
Sqm 338.00
Sqm 431.00
Sqm 279.00
Sqm 398.00
Sqm 354.00

Sqm 373.00
Sqm 423.00
Sqm 566.00
Sqm 720.00
Sqm 803.00
Sqm 1140.00
Sqm 1377.00
Sqm 1503.00
Sqm 507.00
Sqm 590.00
Sqm 782.00
Sqm 983.00
Sqm 1100.00
Sqm 1466.00
Sqm 1825.00
Sqm 2156.00
Sqm 342.00
Sqm 389.00
Sqm 481.00
Sqm 578.00
Sqm 880.00
Sqm 1040.00
Sqm 447.00
Sqm 481.00
Sqm 631.00
Sqm 792.00
Sqm 1040.00
Sqm 1200.00
Sqm 536.00
Sqm 606.00
Sqm 705.00
Sqm 792.00
Sqm 1145.00
Sqm 1221.00
Sqm 616.00
Sqm 692.00
Sqm 783.00
Sqm 916.00
Sqm 1221.00
Sqm 1297.00
Sqm 612.00
Sqm 692.00
Sqm 792.00
Sqm 995.00
Sqm 1221.00
Sqm 1297.00
Sqm 692.00
Sqm 783.00
Sqm 926.00
Sqm 1012.00
Sqm 1281.00
Sqm 1374.00

Sqm 145.00
Sqm 207.00
Sqm 266.00
Sqm 306.00
Sqm 382.00
Sqm 426.00
Sqm 485.00
Sqm 550.00
Sqm 583.00
Sqm 225.00
Sqm 303.00
Sqm 382.00
Sqm 464.00
Sqm 625.00
Sqm 752.00
Sqm 952.00
Sqm 1142.00
Sqm 1523.00
Sqm 526.00
Sqm 568.00
Sqm 610.00
Sqm 667.00
Sqm 741.00
Sqm
971.00
Sqm
1166.00

Sqm 369.00
Sqm 408.00
Sqm 479.00
Sqm 479.00
Sqm 601.00
Sqm 885.00
Sqm 867.00

Sqm 422.00
Sqm 495.00
Sqm 617.00
Sqm 583.00
Sqm 762.00
Sqm 1093.00
Sqm 1097.00

Sqm
546.00
Sqm
711.00
Sqm
912.00
Sqm
1161.00
Sqm
1190.00
Sqm
1387.00

Sqm 366.00
Sqm 524.00
Sqm 575.00
Sqm 389.00
Sqm 541.00
Sqm 583.00

Sqm 409.00
Sqm 752.00
Sqm
255.00
Sqm
249.00
Sqm 225.00
Sqm
535.00

Sqm
626.00

Sqm
674.00

Sqm 235.00
Sqm 126.00
Sqm 189.00
Sqm 251.00
Sqm 314.00
Sqm 376.00
Sqm 439.00
Sqm 503.00
Sqm 564.00
Sqm 628.00
Sqm 185.00
Sqm 272.00
Sqm 209.00
Sqm 279.00
Sqm 349.00
Sqm 418.00
Sqm 24.00
Sqm 42.00
Sqm
400.00

Sqm
333.00

Sqm

1140.00
Sqm

1224.00

Sqm

1359.00

Sqm

1403.00

Sqm
622.00

Sqm
677.00

Sqm

969.00

Rmt 67.00
Rmt 78.00
Rmt 77.00
Rmt 67.00
Rmt 38.00
Rmt 34.00
Rmt 50.00
Rmt 37.00
Rmt 45.00
Rmt 41.00
Rmt 42.00
Rmt 24.00
Rmt 31.00
Each 3.00
Each 3.00
Each 3.00
Each 3.00
Each 3.00
Kg 27.00
Rmt 5.00
liter 129.00
Each 3.00
Rmt 11.00
Rmt 10.00

Sqm

1642.00

Sqm

3169.00

Sqm

694.00

Sqm

765.00

Sqm

834.00

Sqm

836.00

Sqm

962.00
Sqm

1504.00

Sqm

2117.00

Sqm

1883.00

Sqm

1982.00

Sqm

1287.00

Sqm

1108.00
Sqm

1170.00

Sqm

1310.00

Sqm

1448.00

Sqm

3888.00

Sqm

1459.00

Sqm

1506.00
Sqm

1797.00

Sqm

1506.00

Sqm

1797.00

Sqm

2197.00
Sqm

3027.00

Sqm

3490.00

Sqm

2675.00

Sqm

2258.00

Sqm

1263.00
Sqm

4466.00

Sqm

5093.00

Rmt

343.00

Rmt

631.00

Rmt

295.00
Rmt

308.00

Rmt
231.00

Rmt
182.00

Rmt

199.00

Rmt

199.00

Rmt

225.00

Rmt

225.00
Rmt

688.00

Rmt

431.00

Rmt

389.00

Rmt

300.00

Rmt

390.00
Rmt

227.00

Sqm
1731.00
Sqm
1817.00
Sqm
1984.00
Sqm
987.00
Sqm
1192.00
Sqm
1349.00
Sqm
1528.00
Sqm
1901.00

Sqm
1848.00

Sqm
2046.00

Sqm
2231.00

Sqm
2550.00

Sqm

2222.00
Sqm

2822.00

Sqm

2174.00

Sqm

1496.00

Sqm

1281.00

Sqm

2367.00

Sqm
1491.00

Sqm
1630.00
Sqm
1211.00
Sqm
1341.00
Sqm

2630.00

Sqm

1342.00

Sqm

6185.00

Sqm

2382.00

Sqm

2142.00
Sqm

2448.00

Sqm

2222.00
Sqm

2245.00

Sqm

1995.00
Sqm

1762.00

Sqm

3486.00

Sqm

5669.00
Sqm

6377.00

Sqm

7048.00
Sqm

6103.00

Sqm

7989.00

Sqm

941.00
Sqm

1744.00

Sqm

2748.00

Sqm

2362.00

Rmt

545.00
Sqm

11110.00

Sqm

10256.00
Sqm

10940.00

Sqm

20830.00
Sqm

13193.00

Sqm

12499.00
Sqm

20830.00

Sqm

18161.00
Sqm

14956.00

Sqm

23608.00
7605.00

3410.00

8306.00

Sqm

2131.00
Sqm

3502.00

Sqm

3934.00

Sqm

3928.00

Sqm

6300.00

Sqm

6664.00
Sqm

6481.00

Sqm

5937.00

Sqm

5755.00

Sqm

6118.00
Sqm

5391.00

Sqm

7632.00

Sqm

7996.00
Sqm

7270.00

Sqm

6361.00

Sqm

4753.00
Sqm

5075.00

Sqm

5395.00

Sqm

4753.00
Sqm

6731.00

Sqm

7051.00

Sqm

6411.00
Sqm

5670.00

Sqm

5080.00
Sqm

7124.00

Sqm

6549.00
Sqm

5867.00

Sqm

7032.00
7236.00

7,236.00

7236.00

7236.00

7236.00
Sqm

6765.00

Sqm

5289.00

Sqm

5865.00
Sqm

6195.00

Sqm

6784.00
Sqm

5556.00

Sqm

6080.00
Sqm 6,080.00

Sqm

6375.00
Sqm

5980.00

Sqm 6,657.00

Sqm Deleted

7481.00
6557.00

7590.00

Sqm

6907.00
Sqm

4725.00

Sqm

6088.00

Sqm

4167.00
Sqm

7532.00

Sqm

5075.00

Sqm 5,990.00
Sqm 8,428.00

Sqm

5997.00

Sqm

5089.00

Sqm

2938.00
Sqm

3511.00

Sqm

4403.00

Sqm

7270.00
Sqm 5,875.00

Sqm

6259.00

Each 161.00
Each 236.00
Each 315.00
Each 391.00
Each 481.00
Each 44.00
Each 52.00
Each 66.00
Each 79.00
Each 96.00
Each 109.00
Each 288.00
Each 376.00
Each 24.00
Each 35.00
Each 52.00
Each 68.00
Each 85.00
Each 84.00
Each 98.00
Each 147.00
Each 196.00
Each 245.00
Each 293.00

Each 66.00
Each 218.00
Each 264.00
Each 348.00
Each 49.00
Each 64.00
Each 77.00
Each 93.00
Each 11.00
Each 21.00
Each 31.00
Each 40.00
Each 131.00
Each 203.00
Each 213.00
Rmt
32.00
Each 41.00
Each 300.00
Each 63.00
Each 93.00
Each 119.00
Each 148.00

Each 44.00
Each 52.00
Each 74.00
Each 87.00
Each 31.00
Each 45.00
Each 304.00
Each 412.00
Each 743.00
Each 948.00
Each 1483.00
Each 316.00
Each 836.00
Each 64.00
Each 96.00
Each 114.00
Each 140.00
Each 157.00

Each 1164.00
Each 2243.00
Each 3194.00
Each 166.00
Each 192.00
Each 210.00
Each 105.00
Each 137.00
Each 164.00
Each 236.00
Each 279.00
Each 306.00

Each 584.00
Each 672.00
Each 886.00
Each 96.00
Each 105.00
Each 114.00
Each 53.00
Each 66.00

Each
939.00

Each
1086.00

Each
1162.00

Each
1220.00

Each
1734.00
Each
4114.00
Each

3435.00

Each

2554.00

Each

11346.00

Each
848.00
Each
2181.00
Each 180.00
Each 45.00
Each 58.00
Each 10.00
Rmt
116.00
Pair 410.00
Each 14.00
Each 32.00
Each 14.00

Ltr
182.00
Kg
128.00
Kg
86.00
Kg
96.00
Kg
105.00
Kg
78.00
26.00

Ltr 191.00
Kg 122.00
Ltr 318.00
Ltr 386.00
Ltr
73.00
Ltr 272.00
Kg 131.00
Ltr
279.00
Ltr 306.00
Ltr
568.00
Ltr 655.00
sqm
200.00

Ltr 136.00
Kg 409.00
Kg 790.00
Ltr 218.00
Kg 197.00
Ltr 197.00
Ltr 318.00
Ltr 436.00
Kg
680.00
Ltr 314.00

Kg 272.00
Kg
31.00
Kg 726.00
Kg 146.00
Kg 941.00

Ltr 132.00
Kg 34.00
Kg 28.00
Kg 33.00
Kg
78.00
Kg 862.00
Kg 327.00
No. 662.00
Kg 409.00
Kg 304.00
Kg 78.00
Ltr 590.00
Kg 318.00
Kg 91.00
Kg 109.00
Kg 78.00
Ltr 109.00
Ltr 207.00
Kg
262.00
Kg
393.00
Kg
87.00
Kg 42.00

Sqm

270.00

Sqm

374.00
Sqm

509.00

Sqm

405.00

Sqm

374.00

Sqm

592.00

Rmt

675.00

Each
52.00
1440.00

680.00

1400.00

280.00

Sqm
729.00
Sqm
818.00
Sqm
1022.00
Sqm
293.00

Sqm
366.00

Sqm
729.00

Rmt
12.00

Rmt
14.00

Rmt
17.00

Rmt
24.00
Rmt
30.00

Kg 29.00
Cum
608.00
Kg
292.00

Kg
30.00

Kg
18.00
Kg
211.00
Sqm
299.00
Sqm
760.00
Sqm
724.00
Sqm
1229.00
Rmt 3.00
Each 134.00
Each 31.00
Sqm

352.00

Sqm

402.00

Sqm

454.00

Sqm

2345.00
Sqm

2557.00

Sqm

2868.00

Sqm

343.00

Sqm

479.00

Sqm

562.00

Sqm 274.00
Sqm
1009.00

Rmt
395.00
Sqm
1987.00

Rmt
671.00

Rmt

1430.00

Rmt
155.00

Sqm

254.00

Sqm
301.00

Sqm
362.00
Sqm

4163.00

Sqm
3984.00

Sqm
4459.00

Each
113.00
Each
101.00
Sqm 88.00
Each

953.00

Each

3211.00
Each

725.00

Each 3.00
Each 3.00
Cum 3.00
Rmt
7.00
Rmt
8.00

Each 110.00
Each 274.00
Rmt 381.00
Each
46.00

64.00
Each
32.00
Each
78.00

Hr 279.00
Hr 130.00
Hr 121.00
Hr 140.00
Each
76.00
Each
126.00
Each 221.00
Each 11.00
Rmt 442.00
Sqm 1671.00
Kg 126.00
Each 135.00
Hr
356.00

Hr
5.00

Cum
269.00

Cum
318.00
Cum
371.00

Cum
427.00

Cum
664.00

Cum
802.00

Sqm

1134.00

Sqm

1696.00

Sqm

524.00

Rmt
117.00
Rmt
353.00
Rmt
458.00
Rmt
18.00
Rmt
55.00
Rmt 62.00
Kg
29.00

Kg
4.00
Kg
26.00

Kg

23.00
Kg
146.00

Sqm
1953.00

Sqm
1063.00
Sqm
1315.00

Sqm
1643.00

Sqm
426.00

Sqm
318.00

Sqm
2003.00

Sqm
1858.00

Sqm
1661.00

Sqm
1299.00

Sqm
938.00

Sqm
1254.00
Sqm
1932.00
Sqm
1320.00
Sqm
1577.00
Sqm
974.00
Sqm
1255.00
Sqm
670.00
Sqm
750.00
Sqm
1676.00
Sqm
1592.00
Sqm
1389.00
Sqm
1087.00
Sqm
854.00
Sqm
1078.00
Sqm
1616.00
Sqm
1105.00
Sqm
1319.00
Sqm
911.00

Sqm
1147.00
Sqm
587.00

Sqm
666.00

Sqm 195.00
Sqm 121.00
Sqm
415.00

Cum 442.00
Sqm 18.00
Sqm 16.00
Sqm 14.00
Sqm 16.00
Cum 230.00
Sqm 4.00
Sqm 5.00
Cum 72.00
Cum 54.00
Sqm 7.00
Sqm 4.00
Sqm
1.00
Sqm
4.00
Sqm
5.00
WATER SUPPLY & SANITARY ITEMS

Sl.No Item Code Description of item

1 2 3
A SECTION S.W.G. PIPES&FITTINGS
1 SUB-SECTION SUPPLY & LAYING OF S.W.G. PIPES
1 TBSP-A.I-01 Supplying, laying, jointing and testing 101.6 mm SWG SP-1 pipes of ISI make
conforming to ISI 651 & 4127 with airtight cement joints in CM 1.5:1
prop. Including excavation of trenches and socket pits in any soil (except
rock requiring blasting) up to 1524 mm(5'0") depth and refilling with watering
and tamping.

2 TBSP-A.I-02 Supplying, laying, jointing and testing 101.6 mm SWG SP-1 pipes of ISI make
conforming to ISI 651 & 4127 with airtight cement joints in CM 1:5:1 prop.
including excavation of trenches and socket pits in any soil (except rock requiring
blasting) up to 914.4 mm (3'0") depth and refilling with watering and tamping.

3 TBSP-A.I-03 Supplying, laying, jointing and testing 152.4 mm SWG SP-1 pipes of ISI make
conforming to ISI 651 & 4127 with air tight cement joints in CM 1.5:1 prop.
including excavation of trenches and socket pits in any soil (except rock
requiring blasting) up to 1524 mm(5'0") depth and refilling with watering and
tamping.

4 TBSP-A.I-04 Supplying, laying, jointing and testing 152.4 mm SWG SP-1 pipes of ISI make
conforming to ISI 651 & 4127 with airtight cement joints in CM1.5:1 prop.
including excavation of trenches and socket pits in any soil (except rock requiring
blasting) up to 914.4 mm (3'0")) depth and refilling with watering and tamping.

5 TBSP-A.I-05 Providing 152.4 mm CC bed 1:2:4 Prop: using 19.05 mm gauge graded granite
metal chips and cradling 101.6 mm SWG pipe line all round to have 75 mm
nominal size thick cover over the sockets including cost & conveyance of all
materials and all labour charges.
6 TBSP-A.I-06 Providing 152.4mm CC bed 1:2:4 Prop: using 19.05 mm gauge graded granite
metal chips and cradling 152.4 mm SWG pipe line all round to have 75 mm
nominal size thick cover over the sockets including cost & conveyance of all
materials and all labour charges.
7 TBSP-A.I-07 Supplying & Laying 101.6 mm SWG channels with cement mortar joints with
suitable brick masonry for fixing the channels in position
8 TBSP-A.I-08 Supplying & Laying 152.4 mm SWG channels with cement mortar joints with
suitable brick masonry for fixing the channels in position
9 TBSP-A.I-09 Supplying & fixing 150 mm x 100 mm SWG gully traps conforming to ISI
651 & 4127 with C.I Grating & Cost. Brick masonry in CM 1:6 prop. Intermediate
chamber and fitted with 304.8 mm x 288.6mm (12"x9") C.I Frame and hinged
cover
II SUB-SECTION S.W.G. PIPES&FITTINGS
10 TBSP-A.II-01 Supply of SWG SP-1 pipe conforming to ISI 651 - 4" dia (101.6mm)
11 TBSP-A.II-02 Supply of SWG SP-1 pipe conforming to ISI 651 - 6" dia (152.4mm)
12 TBSP-A.II-03 Supply of SWG SP-1 pipe conforming to ISI 651 - 8" dia (203.2mm)
13 TBSP-A.II-04 Supply of SWG SP-1 pipe conforming to ISI 651 - 10" dia (254 mm)
14 TBSP-A.II-05 Supply of SWG SP-1 pipe conforming to ISI 651 - 12" dia (300 mm)
15 TBSP-A.II-06 Supply of SWG SP-1 pipe conforming to ISI 651 - 14" dia (350 mm)
16 TBSP-A.II-07 Supply of SWG SP-2 pipe conforming to ISI 651 - 4" dia (101.6mm)
17 TBSP-A.II-08 Supply of SWG SP-2 pipe conforming to ISI 651 - 6" dia (152.4mm)
18 TBSP-A.II-09 Supply of SWG SP-2 pipe conforming to ISI 651 - 8" dia (203.2mm)
19 TBSP-A.II-10 Supply of SWG SP-2 pipe conforming to ISI 651 - 10" dia (254 mm)
20 TBSP-A.II-11 Supply of SWG SP-2 pipe conforming to ISI 651 - 12" dia (300 mm)
21 TBSP-A.II-12 Supply of SWG SP-2 pipe conforming to ISI 651 - 14" dia (350 mm)
22 TBSP-A.II-13 Supply of SWG SP-2 pipe conforming to ISI 651 - 16" dia (400 mm)
23 TBSP-A.II-14 Supply of SWG SP-2 pipe conforming to ISI 651 - 18" dia (450 mm)
24 TBSP-A.II-15 Supply of SWG SP-3 pipe conforming to ISI 651 - 4" dia (101.6mm)
25 TBSP-A.II-16 Supply of SWG SP-3 pipe conforming to ISI 651 - 6" dia (152.4mm)
26 TBSP-A.II-17 Supply of SWG SP-3 pipe conforming to ISI 651 - 8" dia (203.2mm)
27 TBSP-A.II-18 Supply of SWG SP-3 pipe conforming to ISI 651 - 10" dia (254 mm)
28 TBSP-A.II-19 Supply of SWG SP-3 pipe conforming to ISI 651 - 12" dia (300 mm)
29 TBSP-A.II-20 Supply of SWG SP-3 pipe conforming to ISI 651 - 14" dia (350 mm)
30 TBSP-A.II-21 Supply of SWG SP-2 pipe conforming to ISI 651 - 16" dia (400 mm)
31 TBSP-A.II-22 Supply of SWG SP-3 pipe conforming to ISI 651 - 18" dia (450 mm)
32 TBSP-A.II-23 Supply of SWG Bends conforming to IS standards -100 mm dia
33 TBSP-A.II-24 Supply of SWG Bends conforming to IS standards -150 mm dia
34 TBSP-A.II-25 Supply of SWG Bends conforming to IS standards -200 mm dia
35 TBSP-A.II-26 Supply of SWG Bends conforming to IS standards -250 mm dia
36 TBSP-A.II-27 Supply of SWG Bends conforming to IS standards -300 mm dia
37 TBSP-A.II-28 Supply of SWG Bends conforming to IS standards -350 mm dia
38 TBSP-A.II-29 Supply of SWG Junctions (T's & Y's) conforming to IS standards with length
of barrel 60 cm for - 100 x 100
39 TBSP-A.II-30 Supply of SWG Junctions (T's & Y's) conforming to IS standards with length of
barrel 60 cm for - 150 x 100
40 TBSP-A.II-31 Supply of SWG Junctions (T's & Y's) conforming to IS standards with length of
barrel 60 cm for - 150 x 150
41 TBSP-A.II-32 Supply of SWG Junctions (T's & Y's) conforming to IS standards with
length of barrel 60 cm for - 200 x 100
42 TBSP-A.II-33 Supply of SWG Junctions (T's & Y's) conforming to IS standards with
length of barrel 60 cm for - 200 x 150
43 TBSP-A.II-34 Supply of SWG Junctions (T's & Y's) conforming to IS standards with
length of barrel 60 cm for - 200 x 200
44 TBSP-A.II-35 Supply of SWG Junctions (T's & Y's) conforming to IS standards with
length of barrel 60 cm for - 250 x 100
45 TBSP-A.II-36 Supply of SWG Junctions (T's & Y's) conforming to IS standards with
length of barrel 60 cm for - 250 x 150
46 TBSP-A.II-37 Supply of SWG Junctions (T's & Y's) conforming to IS standards with
length of barrel 60 cm for - 250 x 200
47 TBSP-A.II-38 Supply of SWG Junctions (T's & Y's) conforming to IS standards with
length of barrel 60 cm for - 250 x 250
48 TBSP-A.II-39 Supply of SWG Junctions (T's & Y's) conforming to IS standards with
length of barrel 60 cm for - 300 x 100
49 TBSP-A.II-40 Supply of SWG Junctions (T's & Y's) conforming to IS standards with
length of barrel 60 cm for - 300 x 150
50 TBSP-A.II-41 Supply of SWG Junctions (T's & Y's) conforming to IS standards with
length of barrel 60 cm for - 300 x 200
51 TBSP-A.II-42 Supply of SWG Junctions (T's & Y's) conforming to IS standards with
length of barrel 60 cm for - 300 x 250
52 TBSP-A.II-43 Supply of SWG Junctions (T's & Y's) conforming to IS standards with
length of barrel 60 cm for - 300 x 300
53 TBSP-A.II-44 Supply of SWG Junctions (T's & Y's) conforming to IS standards with
length of barrel 60 cm for - 350 x 100
54 TBSP-A.II-45 Supply of SWG Junctions (T's & Y's) conforming to IS standards with
length of barrel 60 cm for - 350 x 150
55 TBSP-A.II-46 Supply of SWG Junctions (T's & Y's) conforming to IS standards with
length of barrel 60 cm for - 350 x 200
56 TBSP-A.II-47 Supply of SWG Junctions (T's & Y's) conforming to IS standards with
length of barrel 60 cm for - 350 x 250
57 TBSP-A.II-48 Supply of SWG Junctions (T's & Y's) conforming to IS standards with
length of barrel 60 cm for - 350 x 300
58 TBSP-A.II-49 Supply of SWG Junctions (T's & Y's) conforming to IS standards with
length of barrel 60 cm for - 350 x 350
59 TBSP-A.II-50 Supply of SWG Plugs conforming to IS standards for 100 mm dia
60 TBSP-A.II-51 Supply of SWG Plugs conforming to IS standards for 150 mm dia
61 TBSP-A.II-52 Supply of SWG Plugs conforming to IS standards for 200 mm dia
62 TBSP-A.II-53 Supply of SWG Plugs conforming to IS standards for 250 mm dia
63 TBSP-A.II-54 Supply of SWG Plugs conforming to IS standards for 300 mm dia
64 TBSP-A.II-55 Supply of SWG Plugs conforming to IS standards for 350 mm dia
65 TBSP-A.II-56 Supply of SWG Gully Traps (Round & Square) conforming to IS standards 150 x 100
mm
66 TBSP-A.II-57 Supply of SWG Saddles conforming to IS standards 150 x 100 mm
67 TBSP-A.II-58 Supply of SWG Saddles conforming to IS standards 200 x 100 mm
68 TBSP-A.II-59 Supply of SWG Saddles conforming to IS standards 250 x 100 mm
TBSP-A.II-60 Supply of SWG Rubber Rings, glue & Fixing Charges confirming to IS standards
150mm
TBSP-A.II-61 Supply of SWG Rubber Rings, glue & Fixing Charges confirming to IS standards
200mm
TBSP-A.II-62 Supply of SWG Rubber Rings, glue & Fixing Charges confirming to IS standards
250mm
TBSP-A.II-63 Supply of SWG Rubber Rings, glue & Fixing Charges confirming to IS standards
300mm
III SUB-SECTION LABOUR CHARGES FOR SWG WORKS
69 TBSP-A.III-01 Labour charges only for laying, jointing and testing SWG pipes of any dia
with airtight cement joints including excavation of trenches and socket pits in
any soil up to 914.4 mm (3'0") depth (except rock requiring blasting) and
refilling with watering and tamping.
70 TBSP-A.III-02 Labour charges only for laying, jointing and testing SWG pipes of any dia with
airtight cement joints including excavation of trenches and socket pits in any
soil up to 1524 mm (5'-0") depth (except rock requiring blasting)
and refilling with watering and tamping.
71 TBSP-A.III-03 Labour charges only for laying 101.6 mm SWG channels with cement mortar
joints with suitable brick masonry for fixing the channels in position

72 TBSP-A.III-04 Labour charges only for laying 152.4 mm SWG channels with cement mortar
joints with suitable brick masonry for fixing the channels in position
73 TBSP-A.III-05 Labour charges only for fixing and laying the SWG Junctions/ Plugs / Bends of
any dia with airtight cement joints as per standard practice
B SECTION MANHOLES & INSPECTION CHAMBERS - AS PER - IS 4111 : Part 1 : 1986

I SUB-SECTION MANHOLES
74 TBSP-B.I-01 Constructing 904.0mm (3’0”) dia solid block masonry inspection chamber as
per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using fly-ash blocks
of 225 mm thick from approved source having a minimum crushing strength
of 10 N/sq.mm including plastering with cement mortar 1:3 prop; ½” thick both
inside and outside fitted with 20” dia RCC manhole covers and frames
including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils
(excluding rock) and laying cement concrete (1:4:8) 150 mm thick using
40 mm HBG Metal and P.C.C.1:2:4 benching and channel 100 mm thick as per
Standard specification and including cost and conveyance of all materials like
cement, sand, bricks, water etc., to site, cost of seigniorage charges on all
materials and all incidental and operational, labour charges like mixing
cement mortar, constructing masonry, lift charges, curing etc., complete for
finished item of work as per Standard specification.
75 TBSP-B.I-02 Constructing 904.0 mm (3’0”) dia solid block masonry inspection chamber as
per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using fly-ash blocks
of 225 mm thick from approved source having a minimum crushing strength of
10 N/sq.mm including plastering with cement mortar 1:3 prop; ½” thick both
inside and outside fitted with 20” dia RCC manhole covers and frames
including excavating pits up to a depth of 1524 mm (5'-0") in all sorts of
soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using
40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per
Standard specification and including cost and conveyance of all materials like
cement, sand, bricks, water etc., to site, cost of seigniorage charges on all
materials and all incidental and operational, labour charges like mixing
cement mortar, constructing masonry, lift charges, curing etc., complete for
finished item of work as per Standard
specification.

76 TBSP-B.I-03 Constructing 904.0mm (3’0”) dia brick masonry inspection chamber as per IS -
4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks
of 225 mm thick from approved source having a minimum crushing strength of
5 N/sq.mm including plastering with cement mortar 1:3 prop; ½” thick both inside
and outside fitted with 20” dia RCC manhole covers and frames including
excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding
rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG
Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard
specification and including cost and conveyance of all materials like cement,
sand, bricks, water etc., to site, cost of seigniorage charges on all materials
and all incidental and operational, labour charges like mixing cement mortar,
constructing masonry, lift charges, curing etc., complete for finished item of
work as per Standard specification.

77 TBSP-B.I-04 Constructing 904.0mm (3’0”) dia brick masonry inspection chamber as per IS -
4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks
of 225 mm thick from approved source having a minimum crushing strength of
5 N/sq.mm including plastering with cement mortar 1:3 prop; ½” thick both inside
and outside fitted with 20” dia RCC manhole covers and frames including
excavating pits up to a depth of 1524 mm (5'-0") in all sorts of soils (excluding
rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG
Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard
specification and including cost and conveyance of all materials like cement,
sand, bricks, water etc., to site, cost of seigniorage charges on all materials
and all incidental and operational, labour charges like mixing cement mortar,
constructing masonry, lift charges, curing etc., complete for finished item of work
as per Standard specification.

II SUB-SECTION INSPECTION CHAMBERS & COVERS


78 TBSP-B.II-01 Constructing 914.4mm x 457.2 mm (3'0"x1'6") brick in CM 1:6 prop. Masonry
Inspection chamber up to 914.4 mm (3'0") and fitted with light weight 914.4
mm x 457.2 mm (3'0"x1'6") C.I frame and cover of 40 Kg.
79 TBSP-B.II-02 Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop.
Masonry. Inspection chamber up to 914.4 mm (3'0") and fitted with light weight
457.2 mm x 457.2 mm (1'6"x1'6") C.I frame and cover of 20 Kg.
80 TBSP-B.II-03 Constructing Brick masonry chamber over the gully trap or peet valve and fitted
with 304.8 x 228.6 m size CI frame and hinged cover.
81 TBSP-B.II-04 Constructing Brick masonry supports for G.I pipe with Brick in C.M (1:6)
Prop and of size 304.8 x 228.6 x228.6 mm including plastering and finishing
etc., complete.
82 TBSP-B.II-05 Supply & fixing RCC cover 22" dia with nominal reinforcement 3 " thick and hooks
for lifting
83 TBSP-B.II-06 Supplying & fixing 304.8 x 228.6 mm CI frame & cover over gully taps
84 TBSP-B.II-07 Supplying & fixing CI Nahany trap grating
85 TBSP-B.II-08 Supplying & fixing CI gully trap grating
86 TBSP-B.II-09 Supplying & fixing 914.4 x 457.2 mm CI man hole frame and cover (light weight) 30
Kgs
87 TBSP-B.II-10 Supplying & fixing 602 x 602mm CI man hole frame and cover (light weight) 30 Kgs
88 TBSP-B.II-11 Supplying & fixing CI steps for septic tank.
89 TBSP-B.II-12 Supplying & fixing 50.8 cm dia C.I. Man hole frame & cover for 914.4 mm
dia chamber (20 Kgs - Light weight)
90 TBSP-B.II-13 Supplying & fixing 50.8 cm dia C.I. Man hole frame & cover for 914.4 mm
dia chamber (Medium weight) as per IS:1726 - 40 Kgs
III SUB-SECTION LABOUR CHARGES FOR IC WORKS
91 TBSP-B.III-01 Making drainage connection from a drainage line in to an existing inspection
chamber/ manhole including making a hole in to the chambers, placing
necessary pipes in the connection and making good the junction in and out of
the chambers including cost of necessary cement, sand and aggregate etc.,

C SECTION C.I. PIPES&FITTINGS - AS PER - IS 1729:1979 (Materials shall be


procured from the list of approved Brands/ Manufacturers/ Suppliers)
I SUB-SECTION SUPPLYING & LAYING OF C.I. PIPES
92 TBSP-C.I-01 Supplying and fixing of C.I. soil pipes ISI marked conforming to IS:1729-1979 of
approved make with cement caulked joints and fixing as per site requirements
including painting black with Japan paint and fixing with necessary wooden
blocks fixed in the masonry walls in cement mortar (1½:1) including fixing of
M.S. clamps if necessary with required no.of Bombay nails etc., complete for 3"
dia (75 mm nominal size) Single Socket

93 TBSP-C.I-02 Supplying and fixing of C.I. soil pipes ISI marked conforming to IS:1729-1979 of
approved make with cement caulked joints and fixing as per site requirements
including painting black with Japan paint and fixing with necessary wooden
blocks fixed in the masonry walls in cement mortar (1½:1) including fixing of
M.S. clamps if necessary with required no. of Bombay nails etc., complete
for 4" dia (101.6mm) Single Socket

94 TBSP-C.I-03 Supplying and fixing of C.I. soil pipes ISI marked conforming to IS:1729-
1979 of approved make with cement caulked joints and fixing as per site
requirements including painting black with Japan paint and fixing with
necessary wooden blocks fixed in the masonry walls in cement mortar (1½:1)
including fixing of M.S. clamps if necessary with required no. of Bombay nails
etc., complete for 6" dia (152.4mm) Single Socket

95 TBSP-C.I-04 Supplying and fixing of C.I. soil pipes ISI marked conforming to IS:1729-1979 of
approved make with cement caulked joints and fixing as per site requirements
including painting black with Japan paint and fixing with necessary wooden
blocks fixed in the masonry walls in cement mortar (1½:1) including fixing of
M.S. clamps if necessary with required no. of Bombay nails etc., complete
for 3" dia (75 mm nominal size) Double Socket

96 TBSP-C.I-05 Supplying and fixing of C.I. soil pipes ISI marked conforming to IS:1729-1979 of
approved make with cement caulked joints and fixing as per site requirements
including painting black with Japan paint and fixing with necessary wooden
blocks fixed in the masonry walls in cement mortar (1½:1) including fixing of
M.S. clamps if necessary with required no. of Bombay nails etc., complete
for 4" dia (101.6mm) Double Socket

97 TBSP-C.I-06 Supplying and fixing of C.I. soil pipes ISI marked conforming to IS:1729-1979
of approved make with cement caulked joints and fixing as per site requirements
including painting black with Japan paint and fixing with necessary wooden
blocks fixed in the masonry walls in cement mortar (1½:1) including fixing of
M.S. clamps if necessary with required no. of Bombay nails etc., complete
for 6" dia (152.4mm) Double Socket

II SUB-SECTION SUPPLYING & LAYING OF C.I. FITTINGS


98 TBSP-C.II-01 Supplying & fixing CI Plain bends Ist quality ISI marked conforming to
IS:1729-1979 with cement caulked joints and fixing as per site requirements
with standard practice for 3" dia (75 mm nominal size)
99 TBSP-C.II-02 Supplying & fixing CI Plain bends Ist quality ISI marked conforming to
IS:1729-1979 with cement caulked joints and fixing as per site requirements
with standard practice for 4" dia (101.6 mm)
100 TBSP-C.II-03 Supplying & fixing CI Plain bends Ist quality ISI marked conforming to IS:1729-
1979 with cement caulked joints and fixing as per site requirements with standard
practice for 6" dia (152.4 mm)
101 TBSP-C.II-04 Supplying & fixing CI Plug (Door) bends Ist quality ISI marked conforming to
IS:1729-1979 with cement caulked joints and fixing as per site requirements
with standard practice for 3" dia (75 mm nominal size)
102 TBSP-C.II-05 Supplying & fixing CI Plug (Door) bends Ist quality ISI marked conforming to IS:
1729-1979 with cement caulked joints and fixing as per site requirements with
standard practice for 4" dia (101.6 mm)
103 TBSP-C.II-06 Supplying & fixing CI Plug (Door) bends Ist quality ISI marked conforming to
IS:1729-1979 with cement caulked joints and fixing as per site requirements
with standard practice for 6" dia (152.4 mm)
104 TBSP-C.II-07 Supplying and fixing of 75 mm nominal size (3") CI soil single junction with
plug : conforming to IS:1729-1979 with cement caulked joints and fixing
105 TBSP-C.II-08 Supplying and fixing of 101.6 mm (4") CI soil single junction with plug
: conforming to IS:1729-1979 with cement caulked joints and fixing

106 TBSP-C.II-09 Supplying and fixing of 152.4 mm (6") CI soil single junction with plug
: conforming to IS:1729-1979 with cement caulked joints and fixing
107 TBSP-C.II-10 Supplying and fixing of 75 mm nominal size (3") CI soil plain single junction
: conforming to IS:1729-1979 with cement caulked joints and fixing
108 TBSP-C.II-11 Supplying and fixing of 101.6 mm (4") CI soil plain single junction conforming
to IS:1729-1979 with cementcaulked joints and fixing.
109 TBSP-C.II-12 Supplying and fixing of 152.4 mm (6") CI soil plain single junction conforming
to IS:1729-1979 with cement caulked joints and fixing.
110 TBSP-C.II-13 Supplying and Fixing of 75 mm nominal size (3") CI soil Double junction with
plug : conforming to IS:1729-1979 with cement caulked joints and fixing
111 TBSP-C.II-14 Supplying and Fixing of 101.6 mm (4") CI soil Double junction with plug :
conforming to IS:1729-1979 with cement caulked joints and fixing
112 TBSP-C.II-15 Supplying and Fixing of 152.4 mm (6") CI soil Double junction with plug :
conforming to IS:1729-1979 with cement caulked joints and fixing
113 TBSP-C.II-16 Supplying and Fixing of 75 mm nominal size (3") CI soil plain Double junction :
conforming to IS:1729-1979 with cement caulked joints and fixing
114 TBSP-C.II-17 Supplying and Fixing of 101.6 mm (4") CI soil plain Double junction conforming to
IS:1729-1979 with cement caulked joints and fixing
115 TBSP-C.II-18 Supplying and Fixing of 152.4 mm (6") CI soil plain Double junction conforming to
IS:1729-1979 with cement caulked joints and fixing.
116 TBSP-C.II-19 Supplying and Fixing of 75mm C.I. Offsets Ist quality conforming to IS:1729-
1979 with cement caulked joints and fixing -for 76.20 mm (3") C.I. Pipe

117 TBSP-C.II-20 Supplying and Fixing of 75mm C.I. Offsets Ist quality conforming to IS:1729-
1979 with cement caulked joints and fixing -for 101.6 mm (4") C.I. Pipe

118 TBSP-C.II-21 Supplying and Fixing of 75mm C.I. Offsets Ist quality
conforming to IS:1729-1979 with cement caulked joints
and fixing -for 152.4 mm (6") C.I. Pipe
119 TBSP-C.II-22 Supplying and Fixing of 115 mm C.I. Offsets Ist quality
conforming to IS:1729-1979 with cement caulked joints
and fixing - for 76.20 mm (3") C.I. Pipe
120 TBSP-C.II-23 Supplying and Fixing of 115 mm C.I. Offsets Ist quality
conforming to IS:1729-1979 with cement caulked joints
and fixing - for 101.6 mm (4") C.I. Pipe
121 TBSP-C.II-24 Supplying and Fixing of 115mm C.I. Off sets Ist quality conforming to IS:1729-
1979 with cement caulked joints and fixing - for 152.4 mm (6") C.I. Pipe
122 TBSP-C.II-25 Supplying and Fixing of 150 mm C.I. Offsets Ist quality conforming to
IS:1729-1979 with cement caulked joints and fixing for 76.20 mm (3") C.I. Pipe
123 TBSP-C.II-26 Supplying and Fixing of 150 mm C.I. Offsets Ist quality conforming to
IS:1729-1979 with cement caulked joints and fixing for 101.6 mm (4") C.I. Pipe
124 TBSP-C.II-27 Supplying and Fixing of 150 mm C.I. Offsets Ist quality conforming to
IS:1729-1979 with cement caulked joints and fixing for 152.4 mm (6") C.I. Pipe
125 TBSP-C.II-28 Supplying & fixing CI floor traps 1st quality ISI marked conforming to
IS:1729-1979 with C.P. Grating fixing with white cement as per site
requirements with standard practice for nominal dia 75 mm (3") and grating size
165 mm dia of weight not less than 5.5 Kgs
126 TBSP-C.II-29 Supplying & fixing CI floor traps 1st quality ISI marked with C.P.Grating fixing
with white cement as per site requirements with standard practice for nominal dia
100 mm (4") and grating size 100 mm dia of weight not less than 6 Kgs

127 TBSP-C.II-30 Supplying & fixing CI floor traps 1st quality ISI marked conforming to
IS:1729-1979 with C.P. Grating fixing with white cement as per site
requirements with standard practice for nominal dia 75 mm (3") and grating
size 100 mm dia of weight not less than 4.0 Kgs
128 TBSP-C.II-31 Supplying & fixing CI Collars (double socket) Ist quality ISI marked conforming to
IS:1729-1979 with cement caulked joints and fixing as per site requirements
with standard practice for 76.20 mm (3") C.I. Pipe
129 TBSP-C.II-32 Supplying & fixing CI Collars (double socket) Ist quality ISI marked conforming to
IS:1729-1979 with cement caulked joints and fixing as per site requirements with
standard practice for 101.6 mm (4") C.I. Pipe
130 TBSP-C.II-33 Supplying & fixing CI Collars (double socket) Ist quality ISI marked conforming to
IS:1729-1979 with cement caulked joints and fixing as per site requirements with
standard practice for 152.4 mm (6") C.I. Pipe

III SUB-SECTION LABOUR CHARGES FOR CI PIPE WORKS


131 TBSP-C.III-01 Labour charges only for fixing of C.I. Single/ Double Socket soil pipes of any dia
with cement caulked joints and fixing as per site requirements including painting
black with Japan paint and fixing with necessary wooden blocks fixed in the
masonry walls in cement mortar and including fixing of M.S. clamps if necessary
with required nails
132 TBSP-C.III-02 Labour charges only for fixing CI Plain/ Plug (Door) bends with cement caulked
joints and fixing as per site requirements with standard practice
133 TBSP-C.III-03 Labour charges only fixing CI soil single junctions with cement caulked joints
and fixing as per site requirements with standard practice

134 TBSP-C.III-04 Labour charges only fixing CI soil Double junctions with cement caulked joints
and fixing as per site requirements with standard practice

135 TBSP-C.III-05 Labour charges only fixing CI soil Collars, Bends, Offsets etc. with cement
caulked joints and fixing as per site requirements with standard practice

136 TBSP-C.III-06 Labour charges only for fixing CI Nahany/ Floor traps with C.P. Grating fixing
with white cement as per site requirements with standard practice
137 TBSP-C.III-07 Boxing of Nahany traps in RCC floors
138 TBSP-C.III-08 Boxing of W.C Traps in R.C.C floors
D SECTION CENTRIFUGAL CAST IRON PIPES&FITTNGS AS PER IS: 3989 - 1984
I SUB-SECTION SUPPLY OF CENTRIFUGAL CI PIPES
139 TBSP-D.I-01 75 mm dia CI (spun) soils Waste & Ventilating pipe (3 M)
140 TBSP-D.I-02 100 mm dia CI (spun) soils Waste & Ventilating pipe (3 M)
141 TBSP-D.I-03 150 mm dia CI (spun) soils Waste & Ventilating pipe (3 M)
142 TBSP-D.I-04 75 mm dia CI (spun) soils Waste & Ventilating pipe (3 M) Double socket
143 TBSP-D.I-05 100 mm dia CI (spun) soils Waste & Ventilating pipe (3 M) Double socket
144 TBSP-D.I-06 75 mm dia 9'-0" (2743.2 mm) CI (Spun) pipes
145 TBSP-D.I-07 100 mm dia 9'-0" (2743.2 mm) CI (Spun) pipes
146 TBSP-D.I-08 75 mm dia 8'-0" (2438.4 mm) CI (Spun) pipes
147 TBSP-D.I-09 100 mm dia 8'-0" (2438.4 mm) CI (Spun) pipes
148 TBSP-D.I-10 75 mm dia 6'-0" (1828.8 mm) CI (Spun) pipes
149 TBSP-D.I-11 100 mm dia 6'-0" (1828.8 mm) CI (Spun) pipes
150 TBSP-D.I-12 75 mm dia 6'-0" (1828.8 mm) Double Socket CI (Spun) pipes
151 TBSP-D.I-13 100 mm dia 6'-0" (1828.8 mm) Double Socket CI (Spun) pipes
II SUB-SECTION SUPPLY OF C.I. SPUN FITTINGS
152 TBSP-D.II-01 75 mm dia Cut pipes (pieces) 1 foot (304.8 mm) CI (Spun) fittings
153 TBSP-D.II-02 100 mm dia Cut pipes (pieces) 1 foot (304.8 mm) CI (Spun) fittings
154 TBSP-D.II-03 75 mm dia Cut pipes (pieces) 1'.6" (457.2 mm) CI (Spun) fittings
155 TBSP-D.II-04 100 mm dia Cut pipes (pieces) 1'.6" (457.2 mm) CI (Spun) fittings
156 TBSP-D.II-05 150 mm dia Cut pipes (pieces) 1'.6" (457.2 mm) CI (Spun) fittings
157 TBSP-D.II-06 75 mm dia Cut pipes (pieces ) 2 feet (609.6 mm) CI (Spun) fittings
158 TBSP-D.II-07 100 mm dia Cut pipes (pieces ) 2 feet (609.6 mm) CI (Spun) fittings
159 TBSP-D.II-08 150 mm dia Cut pipes (pieces ) 2 feet (609.6 mm) CI (Spun) fittings
160 TBSP-D.II-09 75 mm dia Cut pipes (pieces ) 3 feet (914.4 mm) CI (Spun) fittings
161 TBSP-D.II-10 100 mm dia Cut pipes (pieces ) 3 feet (914.4 mm) CI (Spun) fittings
162 TBSP-D.II-11 75 mm dia Cut pipes (pieces ) 4 feet (1219.2 mm) CI (Spun) fittings
163 TBSP-D.II-12 100 mm dia Cut pipes (pieces ) 4 feet (1219.2 mm) CI (Spun) fittings
164 TBSP-D.II-13 75 mm dia Plain Bend - CI (Spun) fittings
165 TBSP-D.II-14 100 mm dia Plain Bend - CI (Spun) fittings
166 TBSP-D.II-15 150 mm dia Plain Bend - CI (Spun) fittings
167 TBSP-D.II-16 75 mm dia Door Bend - CI (Spun) fittings
168 TBSP-D.II-17 100 mm dia Door Bend - CI (Spun) fittings
169 TBSP-D.II-18 150 mm dia Door Bend - CI (Spun) fittings
170 TBSP-D.II-19 75 mm dia Plain Bend 45 Degrees - CI (Spun) fittings
171 TBSP-D.II-20 100 mm dia Plain Bend 45 Degrees - CI (Spun) fittings
172 TBSP-D.II-21 150 mm dia Plain Bend 45 Degrees - CI (Spun) fittings
173 TBSP-D.II-22 75 mm dia Door Bend 45 Degrees - CI (Spun) fittings

174 TBSP-D.II-23 100 mm dia Door Bend 45 Degrees - CI (Spun) fittings

175 TBSP-D.II-24 150 mm dia Door Bend 45 Degrees - CI (Spun) fittings


176 TBSP-D.II-25 Horn Bend Plain 101.6 x 50 mm nominal size (4" x 2") 100
mm dia - CI (Spun) fittings
177 TBSP-D.II-26 Horn Bend door 101.6 x 50 mm nominal size (4" x 2") 100
mm dia - CI (Spun) fittings
178 TBSP-D.II-27 75 mm dia Heel Rest Bend - CI (Spun) fittings
179 TBSP-D.II-28 100 mm dia Heel Rest Bend - CI (Spun) fittings

180 TBSP-D.II-29 150 mm dia Heel Rest Bend - CI (Spun) fittings


181 TBSP-D.II-30 75 mm dia Single Branch Plain "T" - CI (Spun) fittings
182 TBSP-D.II-31 100 mm dia Single Branch Plain "T" - CI (Spun) fittings
183 TBSP-D.II-32 150 mm dia Single Branch Plain "T" - CI (Spun) fittings
184 TBSP-D.II-33 75 mm dia Single Branch Door "T" - CI (Spun) fittings
185 TBSP-D.II-34 100 mm dia Single Branch Door "T" - CI (Spun) fittings
186 TBSP-D.II-35 150 mm dia Single Branch Door "T" - CI (Spun) fittings
187 TBSP-D.II-36 75 mm dia Single Branch plain "Y" - CI (Spun) fittings
188 TBSP-D.II-37 100 mm dia Single Branch plain "Y" - CI (Spun) fittings
189 TBSP-D.II-38 150 mm dia Single Branch plain "Y" - CI (Spun) fittings
190 TBSP-D.II-39 75 mm dia Single Branch Door "Y" - CI (Spun) fittings
191 TBSP-D.II-40 100 mm dia Single Branch Door "Y" - CI (Spun) fittings
192 TBSP-D.II-41 150 mm dia Single Branch Door "Y" - CI (Spun) fittings
193 TBSP-D.II-42 75 mm dia Double Branch Plain "T" - CI (Spun) fittings
194 TBSP-D.II-43 100 mm dia Double Branch Plain "T" - CI (Spun) fittings
195 TBSP-D.II-44 75 mm dia Double Branch Door "T" - CI (Spun) fittings
196 TBSP-D.II-45 100 mm dia Double Branch Door "T" - CI (Spun) fittings
197 TBSP-D.II-46 75 mm dia Double Branch Plain "Y" - CI (Spun) fittings
198 TBSP-D.II-47 100 mm dia Double Branch Plain "Y" - CI (Spun) fittings
199 TBSP-D.II-48 75 mm dia Double Branch Door "Y" - CI (Spun) fittings
200 TBSP-D.II-49 100 mm dia Double Branch Door "Y" - CI (Spun) fittings
201 TBSP-D.II-50 75 mm dia Shoe Bend - CI (Spun) fittings
202 TBSP-D.II-51 100 mm dia Shoe Bend - CI (Spun) fittings
203 TBSP-D.II-52 150 mm dia Shoe Bend - CI (Spun) fittings
204 TBSP-D.II-53 75 mm dia Collar - CI (Spun) fittings
205 TBSP-D.II-54 100 mm dia Collar - CI (Spun) fittings
206 TBSP-D.II-55 150 mm dia Collar - CI (Spun) fittings
207 TBSP-D.II-56 75 mm dia Cowl - CI (Spun) fittings
208 TBSP-D.II-57 100 mm dia Cowl - CI (Spun) fittings
209 TBSP-D.II-58 150 mm dia Cowl - CI (Spun) fittings
210 TBSP-D.II-59 75 mm dia Offset 3" (75 mm nominal size ) projection - CI (Spun) fittings
211 TBSP-D.II-60 100 mm dia Offset 3" (75 mm nominal size ) projection - CI (Spun) fittings
212 TBSP-D.II-61 150 mm dia Offset 3" (75 mm nominal size ) projection - CI (Spun) fittings
213 TBSP-D.II-62 75 mm dia Offset 6" (152.4mm ) projection - CI (Spun) fittings
214 TBSP-D.II-63 100 mm dia Offset 6" (152.4mm ) projection - CI (Spun) fittings
215 TBSP-D.II-64 150 mm dia Offset 6" (152.4mm ) projection - CI (Spun) fittings
216 TBSP-D.II-65 75 mm dia Long Door Bend - CI (Spun) fittings
217 TBSP-D.II-66 100 mm dia Long Door Bend - CI (Spun) fittings
218 TBSP-D.II-67 75 mm dia Hand Hole pipe ( Inspection pipe)
219 TBSP-D.II-68 100 mm dia Hand Hole pipe ( Inspection pipe)
220 TBSP-D.II-69 150 mm dia Hand Hole pipe ( Inspection pipe)
221 TBSP-D.II-70 75 mm dia P Traps - CI (Spun) fittings
222 TBSP-D.II-71 100 mm dia P Traps - CI (Spun) fittings
223 TBSP-D.II-72 4" x 3" (101.6 mm x 76.2mm ) P. Traps 100 mm dia - CI (Spun) fittings
224 TBSP-D.II-73 4" x 3" (101.6 mm x 76.2mm ) Vent Traps 100 mm dia - CI
225 TBSP-D.II-74 (Spun)
4" fittingsmm x 76.2mm ) Reducer 75 mm dia - CI (Spun) fittings
x 3" (101.6
226 TBSP-D.II-75 6" x 4" (152.4 mm x101.6 mm ) Reducer 75 mm dia - CI (Spun) fittings
227 TBSP-D.II-76 3" x 2" ( 75 mm nominal size x 50 mm nominal size ) plain T 75 mm dia - CI (Spun)
fittings
228 TBSP-D.II-77 3" x 2" ( 75 mm nominal size x 50 mm nominal size ) Door T 75 mm dia - CI (Spun)
fittings
229 TBSP-D.II-78 3" x 2" ( 75 mm nominal size x 50 mm nominal size ) Plain Y 75 mm dia - CI (Spun)
fittings
230 TBSP-D.II-79 3" x 2" ( 75 mm nominal size x 50 mm nominal size ) Door Y 75 mm dia - CI (Spun)
fittings
231 TBSP-D.II-80 4" x 3" (101.6 mm x 76.2mm ) Plain T 75 mm dia - CI (Spun) fittings
232 TBSP-D.II-81 4" x 3" (101.6 mm x 76.2mm ) Door T 75 mm dia - CI (Spun) fittings
233 TBSP-D.II-82 4" x 3" (101.6 mm x 76.2mm ) Plain Y 75 mm dia - CI (Spun) fittings
234 TBSP-D.II-83 4" x 3" (101.6 mm x 76.2mm ) Door Y 75 mm dia - CI (Spun) fittings
235 TBSP-D.II-84 6" x 4" (152.4 mm x101.6 mm ) Plain T 75 mm dia - CI (Spun) fittings
236 TBSP-D.II-85 6" x 4" (152.4 mm x101.6 mm ) Door T 75 mm dia - CI (Spun) fittings
237 TBSP-D.II-86 6" x 4" (152.4 mm x101.6 mm ) Plain Y 75 mm dia - CI (Spun) fittings
238 TBSP-D.II-87 6" x 4" (152.4 mm x101.6 mm ) Door Y 75 mm dia - CI (Spun) fittings
239 TBSP-D.II-88 75 mm dia Plain "T" 27 "(685.8 mm) Special Types of Long Fittings
240 TBSP-D.II-89 100 mm dia - Plain " T" 27 " (685.8 mm ) Special Types of Long CI (Spun) fittings
241 TBSP-D.II-90 75 mm dia Door "T" 27" (685.8 mm ) Special Types of Long CI (Spun) fittings
242 TBSP-D.II-91 100mm dia Door "T" 27" (685.8 mm ) Special Types of Long CI (Spun) fittings
243 TBSP-D.II-92 75 mm dia Plain " Y" 27" (685.8 mm) Special Types of Long CI (Spun) fittings
244 TBSP-D.II-93 100mm dia Plain " Y" 27" (685.8 mm) Special Types of Long CI (Spun) fittings
245 TBSP-D.II-94 75 mm dia Door " Y" 27" (685.8 mm) Special Types of Long CI (Spun) fittings
246 TBSP-D.II-95 100mm dia Door " Y" 27" (685.8 mm) Special Types of Long CI (Spun) fittings
E SECTION VITREOUS CHINAWARE - SANITARY APPLIANCES as per IS:2556 - 2004
(Materials shall be procured from the list of approved Brands/ Manufacturers/
Suppliers)
I SUB-SECTION INDIAN WATER CLOSETS
247 TBSP-E.I-01 Supplying & fixing approved make Indian pattern white
glazed W.C 1st quality ISI marked conforming to IS:2556-
Part-3-2004 with "P" or "S" trap: 580 mm Long
248 TBSP-E.I-02 Supplying & fixing approved make Indian pattern white
glazed W.C 1st quality ISI marked conforming to IS:2556-
Part-3-2004 with "P" or "S" trap: 630 mm Long
249 TBSP-E.I-03 Supplying & fixing approved make Orissa Pan white
glazed W.C 1st quality ISI marked conforming to IS:2556-
Part-3-2004 with "P" or "S" trap: 580 mm x 440 mm
250 TBSP-E.I-04 Supplying & fixing approved make Orissa Pan white
glazed W.C 1st quality ISI marked conforming to IS:2556-
Part-3-2004 with "P" or "S" trap: 630 mm x 450 mm
251 TBSP-E.I-05 Supplying & fixing approved make porcelain foot rest for
squatting I.W.C. (Rectangular pair) of sizes 250 mm x 125
mm x 15 mm thick each foot rest 1st quality ISI marked
conforming to IS:2556-Part-10:1974
252 TBSP-E.I-06 Providing Brick masonry seat for Orissa pan/ Indian W.C.
using traditional common burnt clay bricks as per
standard practice
253 TBSP-E.I-07 Providing Cement Concrete Squatting plate for Orissa
pan/ Indian W.C. in P.C.C. 1:2:4 as per standard practice

II SUB-SECTION FLOOR MOUNTED EWC


254 TBSP-E.II-01 Supplying and fixing approved make wash down European Water Closet of 1st
quality conforming to IS:2556-Part-2-2004 of white glazed with 'P' trap
255 TBSP-E.II-02 Supplying and fixing approved make wash down European Water Closet of 1st
quality conforming to IS:2556-Part-2-2004 of white glazed with 'S' trap
256 TBSP-E.II-03 Supply, Installation and commissioning approved make floor mounted AngloIndian
wash down EWC conforming to IS:2556 (Part 8)-2004 suit with 'P' or 'S' trap with
dual flush porcelain cistern fixed on wash down EWC with all internal parts of dual
flush cistern, ultra solid seat cover of approved make with rubber buffer and cap &
15 mm angle stop cock & 450 mm long PVC inter connection pipe wall flanges all of
approved make etc. complete for finished item of work in all respects: White Colour

257 TBSP-E.II-04 Supply, Installation and commissioning approved make


floor mounted Close Coupled wash down EWC conforming
to IS:2556 (Part 8)-2004 suit with 'P' or 'S' trap with dual
flush porcelain cistern fixed on wash down EWC with all
internal parts of dual flush cistern, ultra solid seat cover of
approved make with rubber buffer and cap & 15 mm
angle stop cock & 450 mm long PVC inter connection pipe
wall flanges all of approved make etc. complete for
finished item of work in all respects: White Colour

258 TBSP-E.II-05 Supply, Installation and commissioning approved make


floor mounted Close Coupled wash down EWC conforming
to IS:2556 (Part 8)-2004 suit with 'P' or 'S' trap with dual
flush porcelain cistern fixed on wash down EWC with all
internal parts of dual flush cistern, ultra solid seat cover of
approved make with rubber buffer and cap & 15 mm
angle stop cock & 450 mm long PVC inter connection pipe
wall flanges all of approved make etc. complete for
finished item of work in all respects: Coloured - Grade - I/
Grade - II
259 TBSP-E.II-06 Supply, Installation and commissioning approved make
floor mounted Close Coupled wash down EWC conforming
to IS:2556 (Part 8)-2004 with 'P' or 'S' trap with dual flush
porcelain cistern fixed on wash down EWC with all
internal parts of dual flush cistern, ultra solid seat cover of
approved make with rubber buffer and cap & 15 mm
angle stop cock & 450 mm long PVC inter connection pipe
wall flanges all of approved make etc. complete for
finished item of work in all respects: Special Colour -
Grade - III

III SUB-SECTION WALL MOUNTED EWC


260 TBSP-E.III-01 Supply, Installation and commissioning approved make
wash down wall mounted EWC conforming to IS:2556
(Part 16)-2002 with 'P' or 'S' trap with concealed flush
cistern fixed in wall with all internal parts of dual flush
cistern, ultra solid seat cover of approved make with
rubber buffer and cap all of approved make etc. complete
for finished item of work in all respects: White colour

261 TBSP-E.III-02 Supply, Installation and commissioning approved make


wash down wall mounted EWC conforming to IS:2556
(Part 16)-2002 with 'P' or 'S' trap with concealed flush
262 TBSP-E.III-03 Supply, Installation
cistern fixed in wall and
with commissioning
all internal partsapproved make
of dual flush
wash down wall mounted EWC conforming
cistern, ultra solid seat cover of approved make with to IS:2556
(Part
rubber16)-2002
buffer andwith cap'P'allorof'S' trap with
approved concealed
make flush
etc. complete
cistern fixeditem
for finished in of
wall
workwithin all internal parts
all respects: of dual
Coloured flush
Grade-I
cistern,
& II ultra solid seat cover of approved make with
rubber buffer and cap all of approved make etc. complete
for finished item of work in all respects: Special Coloured
Grade-III

IV SUB-SECTION CISTERNS FOR WATER CLOSETS

263 TBSP-E.IV-01 Supplying & Fixing low down porcelain flushing tank with lid 10 Lit Capacity with
internal components
264 TBSP-E.IV-02 Supplying & Fixing internal cistern fittings for dual flush cisterns
265 TBSP-E.IV-03 Supplying & Fixing ultra slim concealed flushing cistern of HDPE body and of
size 460 x 450 x 80 mm with internal component for wall mounted Wash down
WC
V SUB-SECTION PLASTIC SEATS FOR WATER CLOSETS
266 TBSP-E.V-01 Supplying and Fixing best Indian make plastic seat and lid for European water
closets with rubber or plastic Buffers as per IS 2548-1996
267 TBSP-E.V-02 Supplying and Fixing best Indian make plastic soft closing seat and lid for
European water closets with rubber or plastic Buffers as per IS 2548-1996
SUB-
VI SECTION WASH HAND BASINS
268 TBSP-E.VI-01 Supplying & Fixing Indian make Flat Back Wash Hand
Basin 1st quality conforming to IS:2556-Part-4:1972 with
waste fittings like rubber plug, chain, 32 mm nominal size
C.P. Fitting with parallel pipe thread conforming to
IS:2963-1979 and fitted with 15 mm nominal bore
Chromium Plated Pillar Tap of 1st quality Indian make
400 grams complete with standard CI brackets including
wooden block: 660 x 460 mm - Single C.P. Pillar cock
269 TBSP-E.VI-02 Supplying & Fixing Indian make Flat Back Wash Hand
Basin 1st quality conforming to IS:2556-Part-4:1972 with
waste fittings like rubber plug, chain, 32 mm nominal size
C.P. Fitting with parallel pipe thread conforming to
IS:2963-1979 and fitted with 15 mm nominal bore
Chromium Plated Pillar Tap of 1st quality Indian make
400 grams complete with standard CI brackets including
wooden block: 630 x 450 mm - Single C.P. Pillar cock

270 TBSP-E.VI-03 Supplying & Fixing Indian make Flat Back Wash Hand
Basin 1st quality conforming to IS:2556-Part-4:1972 with
waste fittings like rubber plug, chain, 32 mm nominal size
C.P. Fitting with parallel pipe thread conforming to
IS:2963-1979 and fitted with 15 mm nominal bore
Chromium Plated Pillar Tap of 1st quality Indian make
400 grams complete with standard CI brackets including
wooden block: 630 x 450 mm - Double C.P. Pillar cock

271 TBSP-E.VI-04 Supplying & Fixing Indian make Flat Back Wash Hand
Basin 1st quality conforming to IS:2556-Part-4:1972 with
waste fittings like rubber plug, chain, 32 mm nominal size
C.P. Fitting with parallel pipe thread conforming to
IS:2963-1979 and fitted with 15 mm nominal bore
Chromium Plated Pillar Tap of 1st quality Indian make
400 grams complete with standard CI brackets including
wooden block: 550 x 400 mm - Single C.P. Pillar cock

272 TBSP-E.VI-05 Supplying & Fixing Indian make Flat Back Wash Hand
Basin 1st quality conforming to IS:2556-Part-4:1972 with
waste fittings like rubber plug, chain, 32 mm nominal size
C.P. Fitting with parallel pipe thread conforming to
IS:2963-1979 and fitted with 15 mm nominal bore
Chromium Plated Pillar Tap of 1st quality Indian make
400 grams complete with standard CI brackets including
wooden block: 550 x 400 mm - Double C.P. Pillar cock

273 TBSP-E.VI-06 Supplying & Fixing Indian make Flat Back Wash Hand
Basin 1st quality conforming to IS:2556-Part-4:1972 with
waste fittings like rubber plug, chain, 32 mm nominal size
C.P. Fitting with parallel pipe thread conforming to
IS:2963-1979 and fitted with 15 mm nominal bore
Chromium Plated Pillar Tap of 1st quality Indian make
400 grams complete with standard CI brackets including
wooden block: 450 x 300 mm - Single C.P. Pillar cock

274 TBSP-E.VI-07 Supplying & Fixing Indian make Flat Back Wash Hand
Basin 1st quality conforming to IS:2556-Part-4:1972 with
waste fittings like rubber plug, chain, 32 mm nominal size
C.P. Fitting with parallel pipe thread conforming to
IS:2963-1979 and fitted with 15 mm nominal bore
Chromium Plated Pillar Tap of 1st quality Indian make
400 grams complete with standard CI brackets including
wooden block: 450 x 300 mm - Double C.P. Pillar cock

275 TBSP-E.VI-08 Supplying & Fixing Indian make below counter Wash
Hand Basin 1st quality with waste fittings like rubber
plug, chain, 32 mm nominal size C.P. Fitting with parallel
pipe thread conforming to IS:2963-1979 and fitted with
15 mm nominal bore Chromium Plated Pillar Tap of 1st
quality Indian make 400 grams complete with standard CI
brackets including wooden block with single CP pillar cock
276 TBSP-E.VI-09 Supplying & Fixing Indian make white glazed vitreous
china porcelain sink conforming to IS:2556-Part-5-1994
on cantilever brackets with waste fittings like rubber plug,
chain, 32 mm nominal size C.P. Fitting with parallel pipe
thread conforming to IS:2963-1979 : 600 x 400 x 250
277 TBSP-E.VI-10 Supplying & Fixing Indian make white glazed vitreous
china porcelain sink conforming to IS:2556-Part-5-1994
on cantilever brackets with waste fittings like rubber plug,
chain, 32 mm nominal size C.P. Fitting with parallel pipe
thread conforming to IS:2963-1979 : 750 x 450 x 250
278 TBSP-E.VI-11 Supplying & fixing oval shape basin white 520x410mm/ 540 x 450 mm
279 TBSP-E.VI-12 Supplying and Fixing Pedestal for Wash Hand Basin
280 TBSP-E.VI-13 Supplying & fixing stainless steel sink size 36" x 18" (914.4x457.2mm)
1 mm thick with accessories
281 TBSP-E.VI-14 Supplying & fixing SINGLE BOWL stainless steel sink size
24"x18"x8 " (609.6 x 457.2 x 203.2mm) 1 mm thick with
accessories
282 TBSP-E.VI-15 Supplying & fixing stainless steel sink size 20" x18" x 8 "
(508x457.2x203.2mm) 1 mm thick with accessories
283 TBSP-E.VI-16 S&F 609.6 x 457.2 x 254 mm RCC terrazzo finished sink
(or constructed at site with 50.8mm thick) brass plug and
chain including CI cantilever brackets
VII SUB-SECTION URINALS
284 TBSP-E.VII-01 Supplying & Fixing white glazed flat back Bowl urinals of
size 440 mm x 265 mm x 315 mm with internal flushing
rim fixed with screws complete Indian make conforming
to IS:2556-1995
285 TBSP-E.VII-02 Supplying & Fixing white glazed flat back half stall urinals
1st quality conforming to IS:2556-1995 with standard C.P.
Spreader fixed with screws complete Indian make : 410 x
265 x 305 mm
286 TBSP-E.VII-03 Supplying & Fixing white glazed flat back half stall urinals
1st quality conforming to IS:2556-1995 with standard C.P.
Spreader fixed with screws complete Indian make : 590 x
375 x 390 mm
287 TBSP-E.VII-04 Supplying & fixing 4 " x 24 " (101.6x609.6mm) white
glazed porcelain channel fixed in brick masonry white
cement pointing.
VIII SUB-SECTION LABOUR CHARGES FOR SANITARY WARE
288 TBSP-E.VIII-01 Labour charges only for fixing Indian pattern W.C with "P" or "S" trap
289 TBSP-E.VIII-02 Labour charges only Fixing Orissa pan W.C with "P" or "S" trap
290 TBSP-E.VIII-03 Labour charges only for fixing porcelain foot rest for squatting I.W.C.
(Rectangular pair)
291 TBSP-E.VIII-04 Labour charges only for fixing low down porcelain flushing tank with
internal components
292 TBSP-E.VIII-05 Labour charges only for fixing internal cistern fittings of any flushing tank
293 TBSP-E.VIII-06 Labour charges only for fixing European Water Closet with 'P' or 'S' trap as per
standard practice
294 TBSP-E.VIII-07 Labour charges only for fixing plastic seat and lid for European water
closet
295 TBSP-E.VIII-08 Labour charges only for fixing Indian make Flat Back Wash Hand Basin
with waste fittings like rubber plug, chain, 32 mm nominal size C.P.
Fitting Pillar Taps complete with standard CI brackets including wooden
block
296 TBSP-E.VIII-09 Labour charges only for fixing pedestal for wash hand basin
297 TBSP-E.VIII-10 Labour charges only for fixing bottle trap to the wash hand basin
298 TBSP-E.VIII-11 Labour charges only Fixing flat back Bowl/ Half stall urinals with fixing
C.P. Spreader and screws complete
299 TBSP-E.VIII-12 Labour charges only for fixing Vitreous china porcelain sinks with waste
fittings, rubber plug, chain, cantilever brackets etc.
F SECTION CP FITTINGS (Materials shall be procured from the list of approved Brands/
Manufacturers/ Suppliers)
I SUB-SECTION TAPS&FAUCETS - BIB TAPS
300 TBSP-F.I-01 S&F of 15 mm brass body CP finish bib tap of not less than
300 grams weight screw type (full turn) with internal /
external threaded connection conforming to IS 8931
301 TBSP-F.I-02 S&F of 15 mm brass body CP finish bib tap of not less than
300 grams weight with quarter turn spindle with either
internal or external threaded connection conforming to IS
8931
302 TBSP-F.I-03 S&F of 15 mm brass body premium variety Chromium
Plated finish bib tap with wall flange of not less than 500
grams weight with quarter turn spindle with either
internal or external threaded connection conforming to IS
8931 and with 7 - 10 years warranty
303 TBSP-F.I-04 S&F of 15 mm brass body premium variety Chromium Plated finish bib tap
angular shape with wall flange of not less than 500 grams weight with quarter turn
spindle with either internal or external threaded connection
conforming to IS 8931 and with 7 - 10 years warranty
304 TBSP-F.I-05 S&F of 15 mm brass body CP finish two way bib tap of not less than 400 grams
weight with quarter turn spindle internal/ external threaded connection
conforming to IS 8931
305 TBSP-F.I-06 S&F of 15 mm brass body premium variety Chromium
Plated finish two way bib tap with flange of not less than
500 grams weight with quarter turn spindle internal/
external threaded connection conforming to IS 8931 and
with 7 - 10 years warranty
306 TBSP-F.I-07 S&F of Chromium plated finish brass body quarter turn Bibcock cum Health
Faucet with 1m long tube and wall hook with 7 - 10 years warranty
307 TBSP-F.I-08 S&F of 15 mm brass body CP finish long body bib tap of not less than 400
grams weight with quarter turn spindle internal / external threaded connection
conforming to IS 8931
II SUB-SECTION TAPS&FAUCETS - PILLAR TAPS
308 TBSP-F.II-01 S&F of 15 mm brass body CP finish pillar tap of not less than 300 grams
weight screw type (full turn) conforming to IS 8931
309 TBSP-F.II-02 S&F of 15 mm brass body CP finish pillar tap of not less than 500 grams
weight quarter turn spindle conforming to
IS 8931
310 TBSP-F.II-03 S&F of 15 mm brass body Premium variety Chromium plated finish pillar
cock with aerator of not less than 500 grams weight quarter turn spindle
conforming to IS 8931 and with a warranty of 7-10 years
311 TBSP-F.II-04 S&F of 15 mm brass body Premium variety Chromium plated finish long
neck pillar cock with aerator of not less than 500 grams weight quarter turn
spindle conforming to IS 8931 and with a warranty of 7-10 years
312 TBSP-F.II-05 S&F of 15 mm brass body Premium variety Chromium
plated finish single lever pillar cock with aerator of not
less than 500 grams weight quarter turn spindle
conforming to IS 8931 and with a warranty of 7-10 years
313 TBSP-F.II-06 S&F premium make Sensotronic sensor faucet for wash basin, and with 7 -
10 years warranty
314 TBSP-F.II-07 S&F premium make Sensotronic concealed type flushing valve for urinal
complete set with installation box with control cock, and with 7 - 10 years
warranty
315 TBSP-F.II-08 S&F premium make Auto closing system pillar cock for wash basin, and with
7 - 10 years warranty
316 TBSP-F.II-09 S&F premium make Auto Closing system Bibcock, and with 7 - 10 years
warranty
III SUB-SECTION TAPS&FAUCETS - OTHER TAPS & SPOUTS
317 TBSP-F.III-01 S&F of 15 mm brass body CP finish self closing tap push
type conforming to IS 1711
318 TBSP-F.III-02 S&F of 15 mm brass body CP finish self closing tap lift
type conforming to IS 1711
319 TBSP-F.III-03 S&F of 15 mm brass body Premium variety Chromium
plated finish Swan neck tap with right/left hand operating
knob with aerator of not less than 500 grams weight
quarter turn spindle conforming to IS 8931 and with a
warranty of 10 years
320 TBSP-F.III-04 S&F of 15 mm brass body CP finish wall mounted sink
spout with connecting legs & wall flanges swinging nozzle
conforming to IS 8931 and with a warranty of 10 years
321 TBSP-F.III-05 S&F of 15 mm brass body CP finish wall mounted sink
spout with connecting legs & wall flanges fixed nozzle
conforming to IS 8931 and with a warranty of 10 years
322 TBSP-F.III-06 S&F of 15 mm bath tub spout minimum 180 mm
projection with diverter system
323 TBSP-F.III-07 S&F of 15 mm bath tub spout with tip ton minimum 180 mm projection with diverter
system
IV SUB-SECTION STOP & ANGLE VALVES
324 TBSP-F.IV-01 S&F 15 mm nominal size CP finish brass stop valve screw type with internal
/external threaded conforming to IS 8931
325 TBSP-F.IV-02 S&F 15 mm nominal size brass concealed stop valve screw type with internal
/external threaded conforming to IS 8931
326 TBSP-F.IV-03 S&F 15 mm nominal size CP finish brass angled stop valve screw type with
internal /external threaded conforming to IS 8931
327 TBSP-F.IV-04 S&F of 15 mm CP finish brass stop valve of not less than 400 grams weight quarter
turn spindle with internal threaded conforming to IS 8931
328 TBSP-F.IV-05 S&F of 15 mm CP finish brass concealed stop valve of not less than 400 grams
weight quarter turn spindle conforming to IS 8931
329 TBSP-F.IV-06 S&F of 15 mm CP finish brass concealed stop valve of not less than 400 grams
weight with adjustable wall flange and quarter turn spindle conforming to IS 8931
and with 7 - 10 years warranty
330 TBSP-F.IV-07 S&F of 15 mm brass angle stop valve of quarter turn spindle type of not less than
400 grams weight with internal threaded conforming to IS 8931
V SUB-SECTION COMBINATION FAUCETS
330 TBSP-F.V-01 S&F of 15 mm CP finish brass body wall mixer with hand shower with center
distance 150 mm conforming to IS 8931
331 TBSP-F.V-02 S&F of 15 mm CP finish brass body wall mixer conforming to IS 8931 with center
distance 150 mm conforming to IS 8931
332 TBSP-F.V-03 S&F of 15 mm premium variety Chromium plated finish brass body wall mixer with
hand shower with a provision for over head shower with 115 mm long bend pipe on
upper side, connecting legs & wall flanges conforming to IS 8931 with 7 - 10 years
warranty
333 TBSP-F.V-04 S&F of 15 mm brass forged body concealed diverter with regular flow
334 TBSP-F.V-05 S&F of 15 mm brass forged body concealed diverter with high flow
335 TBSP-F.V-06 S&F of 15 mm brass forged body concealed diverter forged body with 3 way in let

336 TBSP-F.V-07 S&F of 15 mm central hole Chromium plated finish brass body basin mixer 450 mm
long pipe for hot & cold water mixing conforming to IS 8931 and with 7 - 10 years
warranty
337 TBSP-F.V-08 S&F of 15 mm central hole Chromium plated finish brass body single lever basin
mixer 450 mm long breaded pipe for hot & cold water mixing conforming to IS 8931
and with 7 - 10 years warranty
338 TBSP-F.V-09 S&F of 15 mm central hole Chromium plated finish brass body sink mixer with
swinging cascade round shape spout (wall/ table mounted model) with connecting
legs & wall flanges conforming to IS 8931 and with 7 - 10 years warranty

VI SUB-SECTION SHOWERS & FITTINGS


339 TBSP-F.VI-01 S&F 15 mm nominal size 152.0 mm CP finish iron body shower
340 TBSP-F.VI-02 S&F 15 mm nominal size 137.0 mm CP finish iron body shower
341 TBSP-F.VI-03 S&F 15 mm nominal size 101.6 mm CP finish iron body shower
342 TBSP-F.VI-04 S&F 15 mm nominal size CP finish shower 200 mm dia with CP finish flexible pipe

343 TBSP-F.VI-05 S&F 15 mm nominal size CP finish brass over head shower arm of 450 mm long
with 90 degree bend & wall flange suitable for rain shower
344 TBSP-F.VI-06 S&F 15 mm nominal size Chromium plated finish brass over head shower arm of
450 mm long with 90 degree bend & wall flange suitable for rain shower and with 7 -
10 years warranty
345 TBSP-F.VI-07 S&F 15 mm nominal size over head 5 flow round massage shower
346 TBSP-F.VI-08 S&F 15 mm nominal size 5 flow hand shower with rubbit cleaning system and 1.5 m
long flexible hose and wall hook.
VII SUB-SECTION MISCELLANEOUS CP FITTINGS
347 TBSP-F.VII-01 S&F of 15 mm Stainless steel flexible hose 1.0 m long for hand shower / health
faucet with brass nuts
348 TBSP-F.VII-02 S&F of 15 mm CP finish brass body health faucet gun
349 TBSP-F.VII-03 S&F CP finish brass bottle trap 250 mm long with wall connection pipe & wall Flange

350 TBSP-F.VII-04 S&F CP finish brass bottle trap 190mm long with wall connection pipe & wall Flange

351 TBSP-F.VII-05 S&F PVC bottle trap with wall connection pipe
352 TBSP-F.VII-06 S&F CP finish brass body 32 mm dia nominal size waste coupling with half/full
thread & brass check nut conforming to IS 2963: 1979
353 TBSP-F.VII-07 S&F CP finish brass body 32 mm dia nominal size waste coupling with half/ full
thread & brass body check nut and chain & plug conforming to IS 2963: 1979
354 TBSP-F.VII-08 S&F CP finish brass body 32 mm dia nominal size waste coupling doom type with
half/ full thread & brass body check nut conforming to IS 2963: 1979
355 TBSP-F.VII-09 S&F brass body CP spreader for urinals
356 TBSP-F.VII-10 S&F CP finish steel towel rod of 600 mm long and 20 mm dia with brackets
357 TBSP-F.VII-11 S&F CP finish brass towel rod 600 mm long and 20 mm dia with brackets
358 TBSP-F.VII-12 S&F of Towel rod 24 " premium make powder coated stainless steel body with 7 - 10
years warranty
359 TBSP-F.VII-13 S&F CP finish brass wall mounted towel ring
360 TBSP-F.VII-14 S&F of Chromium plated finish stainless steel body Towel Ring with 7 - 10 years
warranty
361 TBSP-F.VII-15 S&F of powder coated brass body finish Towel ring premium make with 7 - 10 years
warranty
362 TBSP-F.VII-16 S&F of Chromium plated finish stainless steel body towel rail 24'' with 7 - 10 years
warranty
363 TBSP-F.VII-17 S&F powder coated stainless steel body wall mounted towel rack 600 mm long
364 TBSP-F.VII-18 S&F CP finish brass metal body single coat hook
365 TBSP-F.VII-19 S&F CP finish brass robe hook
366 TBSP-F.VII-20 Supply & Fixing Double coat hook with 7 - 10 years warranty
367 TBSP-F.VII-21 S&F CP finish brass soap dish
368 TBSP-F.VII-22 S&F Stainless steel liquid soap container wall mounted and bottle type
369 TBSP-F.VII-23 S&F premium make wall mirror with provision for over head shower and 115 mm
long bend pipe with wall flange and with 7 - 10 years warranty
370 TBSP-F.VII-24 S&F premium make wall mirror with provision for over head shower and 115 mm
long bend pipe with wall flange powder coated with 7 - 10 years warranty
371 TBSP-F.VII-25 S&F of Chromium plated finish stainless steel body Toilet paper holder with 7 - 10
years warranty
372 TBSP-F.VII-26 S&F Stainless steel 4" dia round Grating with frame for nahany or floor trap cover
with or without hole
373 TBSP-F.VII-27 S&F Stainless steel 5" square Grating with frame for nahany or floor trap cover with
or without hole
374 TBSP-F.VII-28 S&F Stainless steel 4" dia round Grating for nahany or floor trap cover with
cockroach trap with or without hole
375 TBSP-F.VII-29 S&F Stainless steel 5" square Grating for nahany or floor trap cover with cockroach
trap with or without hole
376 TBSP-F.VII-30 S&F brass body plumber union of size 31.75 mm dia with check nut
377 TBSP-F.VII-31 S&F brass body plumber union of size 38.1 mm dia with check nut
378 TBSP-F.VII-32 S&F 4" dia CP thimble pipe: 150 mm long
379 TBSP-F.VII-33 S&F 4" dia CP thimble pipe: 220 mm long
380 TBSP-F.VII-34 S&F 4" dia CP thimble pipe: 300 mm long
381 TBSP-F.VII-35 S&F CP long bend
382 TBSP-F.VII-36 S&F CP short bend
383 TBSP-F.VII-37 Supply & fixing of LLC handle set 1st quality
384 TBSP-F.VII-38 S & F premium make copper pipe 450 mm long with nuts & washers with 7 - 10
years warranty
385 TBSP-F.VII-39 S & F premium make copper pipe 450 mm long with nuts & washers power colour
coated and with 7 - 10 years warranty
386 TBSP-F.VII-40 S&F of Chromium plated finish stainless steel body Tumbler holder with 7 - 10 years
warranty
387 TBSP-F.VII-41 S&F of Chromium plated finish stainless steel body Glass shelf 22'' with 7 - 10 years
warranty
VIII SUB-SECTION LABOUR CHARGES
388 TBSP-F.VIII-01 Labour charges for fixing all types of CP TapS&Faucets
389 TBSP-F.VIII-02 Labour charges for fixing all types of CP Stop & Angle Valves
390 TBSP-F.VIII-03 Labour charges for fixing all types of wall combination taps, mixers & diverters
391 TBSP-F.VIII-04 Labour charges for fixing all types of miscellaneous CP fittings
392 TBSP-F.VIII-05 Mechanical Cleaning of water sumps with pumps & UV disinfecting
SECTION G.I. PIPES&FITTINGS (Materials shall be procured from the list of
G approved Brands/ Manufacturers/ Suppliers)
I SUB-SECTION G.I. PIPES
393 TBSP-G.I-01 S&F 15 mm Nominal Bore GI pipe Light Grade properties & weight as per IS
1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour
charges complete
394 TBSP-G.I-02 S&F 20 mm Nominal Bore GI pipe Light Grade properties & weight as per IS
1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour
charges complete
395 TBSP-G.I-03 S&F 25 mm Nominal Bore GI pipe Light Grade properties
& weight as per IS 1239 ISI mark with GI fittings including
the cost of pipe & its fittings & labour charges complete
396 TBSP-G.I-04 S&F 32 mm Nominal Bore GI pipe Light Grade properties
& weight as per IS 1239 ISI mark with GI fittings including
the cost of pipe & its fittings & labour charges complete
397 TBSP-G.I-05 S&F 40 mm Nominal Bore GI pipe Light Grade properties
& weight as per IS 1239 ISI mark with GI fittings including
the cost of pipe & its fittings & labour charges complete
398 TBSP-G.I-06 S&F 50 mm Nominal Bore GI pipe Light Grade properties
& weight as per IS 1239 ISI mark with GI fittings including
the cost of pipe & its fittings & labour charges complete
399 TBSP-G.I-07 S&F 15 mm Nominal Bore GI pipe Medium Grade
properties & weight as per IS 1239 ISI mark with GI
fittings including the cost of pipe & its fittings & labour
charges complete
400 TBSP-G.I-08 S&F 20 mm Nominal Bore GI pipe Medium Grade
properties & weight as per IS 1239 ISI mark with GI
fittings including the cost of pipe & its fittings & labour
charges complete
401 TBSP-G.I-09 S&F 25 mm Nominal Bore GI pipe Medium Grade
properties & weight as per IS 1239 ISI mark with GI
fittings including the cost of pipe & its fittings & labour
402 TBSP-G.I-10 S&F 32 mm Nominal Bore GI pipe Medium Grade
charges complete
properties & weight as per IS 1239 ISI mark with GI
fittings including the cost of pipe & its fittings & labour
403 TBSP-G.I-11 S&F
charges40complete
mm Nominal Bore GI pipe Medium Grade
properties & weight as per IS 1239 ISI mark with GI
fittings including the cost of pipe & its fittings & labour
404 TBSP-G.I-12 S&F 50 mm Nominal Bore GI pipe Medium Grade
charges complete
properties & weight as per IS 1239 ISI mark with GI
fittings including the cost of pipe & its fittings & labour
405 TBSP-G.I-13 S&F 65 mm Nominal Bore GI pipe Medium Grade
charges complete
properties & weight as per IS 1239 ISI mark with GI
fittings including the cost of pipe & its fittings & labour
charges complete

II SUB-SECTION G.I. FITTINGS


406 TBSP-G.II-01S&F GI union 15 mm nominal sizeIst Quality
407 TBSP-G.II-02S&F GI union 20 mm nominal size Ist Quality
408 TBSP-G.II-03S&F GI union 25 mm nominal size Ist Quality
409 TBSP-G.II-04S&F GI union 30 mm nominal size Ist Quality
410 TBSP-G.II-05S&F GI union 40 mm nominal size Ist Quality
411 TBSP-G.II-06S&F GI union 50 mm nominal size Ist Quality
412 TBSP-G.II-07S&F GI connector 25 mm nominal sizedia
413 TBSP-G.II-08S&F 15 mm nominal sizeGI 'T' A class Ist quality
414 TBSP-G.II-09S&F 30 mm nominal size dia GI bend Ist quality
415 TBSP-G.II-10S&F 30 mm nominal size dia GI 'T' 1st Quality
416 TBSP-G.II-11S&F 25 mm nominal size copper body float valve with PVC ball Indian make ISI
mark
417 TBSP-G.II-12 S&F 20 mm nominal size copper body float valve with PVC ball Indian make ISI
mark
418 TBSP-G.II-13 S&F 15 mm nominal size copper body float valve with PVC ball Indian make ISI
mark
419 TBSP-G.II-14 Supplying & fixing leather washers for 15 mm nominal sizebib tap and stop cock
420 TBSP-G.II-15 Supplying & fixing leather washers for 20 mm nominal size bib tap and stop cock
421 TBSP-G.II-16 Supplying & Fixing 15 mm nominal sizefibre washers
422 TBSP-G.II-17 Supplying & Fixing 20 mm nominal size fibre washers
423 TBSP-G.II-18 S&F 15 mm nominal sizeholder bat clamps
424 TBSP-G.II-19 S&F 20 mm nominal size holder bat clamps
425 TBSP-G.II-20 S&F 25 mm nominal size holder bat clamps
426 TBSP-G.II-21 S&F 40 mm nominal size holder bat clamps
427 TBSP-G.II-22 Supplying & fixing 15 mm nominal size GI drain pipe with plug for tanks (Mud valve)
including making a hole
428 TBSP-G.II-23 Supplying & fixing 20 mm nominal size GI drain pipe with plug for tanks (Mud valve)
including making a hole
429 TBSP-G.II-24 Supplying & fixing 25 mm nominal size GI drain pipe with plug for tanks (Mud valve)
including making a hole
III SUB-SECTION GUN METAL (COPPER ALLOY) VALVES
430 TBSP-G.III-01 S&F Bronze Gate/ Globe valve as per IS - 778 Class - I,
Indian make heavy type - 15 mm NB Size
431 TBSP-G.III-02 S&F Bronze Gate/ Globe valve as per IS - 778 Class - I,
Indian make heavy type - 20 mm NB Size
432 TBSP-G.III-03 S&F Bronze Gate/ Globe valve as per IS - 778 Class - I,
Indian make heavy type - 25 mm NB Size
433 TBSP-G.III-04 S&F Bronze Gate/ Globe valve as per IS - 778 Class - I,
Indian make heavy type - 32 mm NB Size
434 TBSP-G.III-05 S&F Bronze Gate/ Globe valve as per IS - 778 Class - I,
Indian make heavy type - 40 mm NB Size
435 TBSP-G.III-06 S&F Bronze Gate/ Globe valve as per IS - 778 Class - I,
Indian make heavy type - 50 mm NB Size
436 TBSP-G.III-07 S&F Bronze Gate/ Globe valve as per IS - 778 Class - I,
Indian make heavy type - 65 mm NB Size
437 TBSP-G.III-08 S&F Bronze Gate/ Globe valve as per IS - 778 Class - I,
Indian make heavy type - 80 mm NB Size
438 TBSP-G.III-09 Supplying & fixing Bronze Horizontal Check (Non return)
Valve as per IS-778 I-class heavy duty - 15 mm NB Size
439 TBSP-G.III-10 Supplying & fixing Bronze Horizontal Check (Non return)
Valve as per IS-778 I-class heavy duty - 20 mm NB Size
440 TBSP-G.III-11 Supplying & fixing Bronze Horizontal Check (Non return)
Valve as per IS-778 I-class heavy duty - 25 mm NB Size
441 TBSP-G.III-12 Supplying & fixing Bronze Horizontal Check (Non return)
Valve as per IS-778 I-class heavy duty - 32 mm NB Size
442 TBSP-G.III-13 Supplying & fixing Bronze Horizontal Check (Non return)
Valve as per IS-778 I-class heavy duty - 40 mm NB Size
443 TBSP-G.III-14 Supplying & fixing Bronze Vertical Check (Non return)
Valve as per IS-778 I-class heavy duty - 15 mm NB Size
444 TBSP-G.III-15 Supplying & fixing Bronze Vertical Check (Non return)
Valve as per IS-778 I-class heavy duty - 20 mm NB Size
445 TBSP-G.III-16 Supplying & fixing Bronze Vertical Check (Non return)
Valve as per IS-778 I-class heavy duty - 25 mm NB Size
446 TBSP-G.III-17 Supplying & fixing Bronze Vertical Check (Non return)
Valve as per IS-778 I-class heavy duty - 32 mm NB Size
447 TBSP-G.III-18 Supplying & fixing Bronze Vertical Check (Non return)
Valve as per IS-778 I-class heavy duty - 40 mm NB Size
448 TBSP-G.III-19 Supplying & fixing Bronze Vertical Check (Non return)
Valve as per IS-778 I-class heavy duty - 50 mm NB Size
449 TBSP-G.III-20 S&F Bronze Ball valve with SS Ball and SS Spindle as per
IS - Class - I, Indian make heavy type - 15 mm NB Size
450 TBSP-G.III-21 S&F Bronze Ball valve with SS Ball and SS Spindle as per
IS - Class - I, Indian make heavy type - 20 mm NB Size
451 TBSP-G.III-22 S&F Bronze Ball valve with SS Ball and SS Spindle as per
IS - Class - I, Indian make heavy type - 25 mm NB Size
452 TBSP-G.III-23 S&F Bronze Ball valve with SS Ball and SS Spindle as per
IS - Class - I, Indian make heavy type - 32 mm NB Size
453 TBSP-G.III-24 S&F Bronze Ball valve with SS Ball and SS Spindle as per
IS - Class - I, Indian make heavy type - 40 mm NB Size
454 TBSP-G.III-25 S&F Bronze Ball valve with SS Ball and SS Spindle as per
IS - Class - I, Indian make heavy type - 50 mm NB Size
455 TBSP-G.III-26 S&F Bronze Compact pressure reducing valve (Screwed) as per IS - Class
-I, Indian make heavy type - 15 mm NB Size
456 TBSP-G.III-27 S&F Bronze Compact pressure reducing valve (Screwed)
as per IS - Class -I, Indian make heavy type - 20 mm NB
Size
IV SUB-SECTION LABOUR CHARGES FOR G.I PLUMBING
457 TBSP-G.IV-01 Taking branch water connection from the existing 25 mm nominal size GI
pipe including cutting threading, etc, complete with fitting
458 TBSP-G.IV-02 Taking branch water connection from the existing 20 mm nominal size GI
pipe including cutting threading, etc, complete with fitting
459 TBSP-G.IV-03 Taking branch water connection from the existing 15 mm nominal size GI
pipe including cutting threading, etc, complete with fitting
H SECTION PVC PIPES&FITTINGS (Materials shall be procured from the list of
approved Brands/ Manufacturers/ Suppliers)
I SUB-SECTION PVC PIPES
460 TBSP-H.I-01 75 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm
461 TBSP-H.I-02 90 mm dia 3 M single Socket PVC/SWR pipe - 4 Kg/sq.cm
462 TBSP-H.I-03 110 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm
463 TBSP-H.I-04 75 mm dia 3 M Double Socket PVC/SWR pipe - 4 Kg/sq.cm
464 TBSP-H.I-05 90 mm dia 3 M Double Socket PVC/SWR pipe - 4 Kg/sq.cm
465 TBSP-H.I-06 110 mm dia 3 M Double Socket PVC/SWR pipe - 4 Kg/sq.cm
466 TBSP-H.I-07 75 mm dia 1828.8 mm (6'-0") Single Socket PVC/SWR pipe - 4 Kg/sq.cm
467 TBSP-H.I-08 90 mm dia 1828.8 mm (6'-0") Single Socket PVC/SWR pipe - 4 Kg/sq.cm
468 TBSP-H.I-09 110 mm dia 1828.8 mm (6'-0") Single Socket PVC/SWR pipe - 4 Kg/sq.cm
469 TBSP-H.I-10 75 mm dia 1828.8 mm (6'-0") Double Socket PVC/SWR pipe - 4 Kg/sq.cm
470 TBSP-H.I-11 90 mm dia 1828.8 mm (6'-0") Double Socket PVC/SWR pipe - 4 Kg/sq.cm
471 TBSP-H.I-12 110 mm dia 1828.8 mm (6'-0") Double Socket PVC/SWR pipe - 4 Kg/sq.cm
472 TBSP-H.I-13 75 mm dia 1219. mm (4'-0") Double Socket PVC/SWR pipe - 4 Kg/sq.cm
473 TBSP-H.I-14 90 mm dia 1219. mm (4'-0") Double Socket PVC/SWR pipe - 4 Kg/sq.cm
474 TBSP-H.I-15 110 mm dia 1219. mm (4'-0") Double Socket PVC/SWR pipe - 4 Kg/sq.cm
475 TBSP-H.I-16 75 mm dia 914.4mm (3'-0") Double Socket PVC/SWR pipe - 4 Kg/sq.cm
476 TBSP-H.I-17 90 mm dia 914.4mm (3'-0") Double Socket PVC/SWR pipe - 4 Kg/sq.cm
477 TBSP-H.I-18 110 mm dia 914.4mm (3'-0") Double Socket PVC/SWR pipe - 4 Kg/sq.cm
478 TBSP-H.I-19 75 mm dia 609.6mm (2'-0") Double Socket PVC/SWR pipe - 4 Kg/sq.cm
479 TBSP-H.I-20 90 mm dia 609.6mm (2'-0") Double Socket PVC/SWR pipe - 4 Kg/sq.cm
480 TBSP-H.I-21 110 mm dia 609.6mm (2'-0") Double Socket PVC/SWR pipe - 4 Kg/sq.cm
481 TBSP-H.I-22 160 MM dia 3 M Double Socket PVC/SWR pipe - 4 Kg/sq.cm
482 TBSP-H.I-23 75 mm dia 3 M Single Socket PVC/SWR pipe - 6 Kg/sq.cm
483 TBSP-H.I-24 90 mm dia 3 M single Socket PVC/SWR pipe - 6 Kg/sq.cm
484 TBSP-H.I-25 110 mm dia 3 M Single Socket PVC/SWR pipe - 6 Kg/sq.cm
485 TBSP-H.I-26 75 mm dia 3 M Double Socket PVC/SWR pipe - 6 Kg/sq.cm
486 TBSP-H.I-27 90 mm dia 3 M Double Socket PVC/SWR pipe - 6 Kg/sq.cm
487 TBSP-H.I-28 110 mm dia 3 M Double Socket PVC/SWR pipe - 6 Kg/sq.cm
488 TBSP-H.I-29 75 mm dia 1828.8 mm (6'-0") Single Socket PVC/SWR pipe - 6 Kg/sq.cm
489 TBSP-H.I-30 90 mm dia 1828.8 mm (6'-0") Single Socket PVC/SWR pipe - 6 Kg/sq.cm
490 TBSP-H.I-31 110 mm dia 1828.8 mm (6'-0") Single Socket PVC/SWR pipe - 6 Kg/sq.cm
491 TBSP-H.I-32 75 mm dia 1828.8 mm (6'-0") Double Socket PVC/SWR pipe - 6 Kg/sq.cm
492 TBSP-H.I-33 90 mm dia 1828.8 mm (6'-0") Double Socket PVC/SWR pipe - 6 Kg/sq.cm
493 TBSP-H.I-34 110 mm dia 1828.8 mm (6'-0") Double Socket PVC/SWR pipe - 6 Kg/sq.cm
494 TBSP-H.I-35 75 mm dia 1219. mm (4'-0") Double Socket PVC/SWR pipe - 6 Kg/sq.cm
495 TBSP-H.I-36 90 mm dia 1219. mm (4'-0") Double Socket PVC/SWR pipe - 6 Kg/sq.cm
496 TBSP-H.I-37 110 mm dia 1219. mm (4'-0") Double Socket PVC/SWR pipe - 6 Kg/sq.cm
497 TBSP-H.I-38 75 mm dia 914.4mm (3'-0") Double Socket PVC/SWR pipe - 6 Kg/sq.cm
498 TBSP-H.I-39 90 mm dia 914.4mm (3'-0") Double Socket PVC/SWR pipe - 6 Kg/sq.cm
499 TBSP-H.I-40 110 mm dia 914.4mm (3'-0") Double Socket PVC/SWR pipe - 6 Kg/sq.cm
500 TBSP-H.I-41 75 mm dia 609.6mm (2'-0") Double Socket PVC/SWR pipe - 6 Kg/sq.cm
501 TBSP-H.I-42 90 mm dia 609.6mm (2'-0") Double Socket PVC/SWR pipe - 6 Kg/sq.cm
502 TBSP-H.I-43 110 mm dia 609.6mm (2'-0") Double Socket PVC/SWR pipe - 6 Kg/sq.cm
503 TBSP-H.I-44 160 mm dia 3 M Double Socket PVC/SWR pipe - 6 Kg/sq.cm
II SUB-SECTION PVC FITTINGS
504 TBSP-H.II-01 Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank
with Double layer approved brand & manufacture with cover and suitable locking
arrangement & making necessary holes for inlet & outlets and over flow pipes but
without fittings & base support for tanks
505 TBSP-H.II-02 Supply of Plastic storage tank lid with hinges
506 TBSP-H.II-03 Supply & Fixing 75 mm nominal size dia PVC elbow Ist quality
507 TBSP-H.II-04 Supply & fixing 30 mm nominal size dia PVC flexible waste pipe of 914.4 mm length
of Ist quality
508 TBSP-H.II-05 Supply & Fixing 40 mm nominal size dia PVC solid waste pipe outlet
509 TBSP-H.II-06 Supply & fixing Fancy PVC shelf including all fittings
510 TBSP-H.II-07 Supply & fixing of PVC low level system with internal components & short bend: 10
Liters capacity Single Flush
511 TBSP-H.II-08 Supply & fixing of PVC low level system with internal components & short bend: 10
liters capacity Dual Flush
512 TBSP-H.II-09 Supply & fixing of PVC low level system with internal components & short bend: 8
Liters capacity single Flush
513 TBSP-H.II-10 75 mm dia - Plain Bend 87.5 Degree - UPVC/SWR Pipe fittings
514 TBSP-H.II-11 90 mm dia - Plain Bend 87.5 Degree - UPVC/SWR Pipe fittings
515 TBSP-H.II-12 110 mm dia - Plain Bend 87.5 Degree - UPVC/SWR Pipe fittings
516 TBSP-H.II-13 75 mm dia - Door Bend 87.5 Degree - UPVC/SWR Pipe fittings
517 TBSP-H.II-14 90 mm dia - Door Bend 87.5 Degree - UPVC/SWR Pipe fittings
518 TBSP-H.II-15 110 mm dia - Door Bend 87.5 Degree - UPVC/SWR Pipe fittings
519 TBSP-H.II-16 75 mm dia - 45 Degree Bend - UPVC/SWR Pipe fittings
520 TBSP-H.II-17 90 mm dia - 45 Degree Bend - UPVC/SWR Pipe fittings
521 TBSP-H.II-18 110 mm dia - 45 Degree Bend - UPVC/SWR Pipe fittings
522 TBSP-H.II-19 75 mm dia - Cleaning Pipe - UPVC/SWR Pipe fittings
523 TBSP-H.II-20 90 mm dia - Cleaning Pipe - UPVC/SWR Pipe fittings
524 TBSP-H.II-21 110 mm dia - Cleaning Pipe - UPVC/SWR Pipe fittings
525 TBSP-H.II-22 75 mm dia - Single Tee - UPVC/SWR Pipe fittings
526 TBSP-H.II-23 90 mm dia - Single Tee - UPVC/SWR Pipe fittings
527 TBSP-H.II-24 110 mm dia - Single Tee - UPVC/SWR Pipe fittings
528 TBSP-H.II-25 75 mm dia - Single Tee with Door - UPVC/SWR Pipe fittings
529 TBSP-H.II-26 90 mm dia - Single Tee with Door - UPVC/SWR Pipe fittings
530 TBSP-H.II-27 110 mm dia - Single Tee with Door - UPVC/SWR Pipe fittings
531 TBSP-H.II-28 75 mm dia - Double Tee - UPVC/SWR Pipe fittings
532 TBSP-H.II-29 90 mm dia - Double Tee - UPVC/SWR Pipe fittings
533 TBSP-H.II-30 110 mm dia - Double Tee - UPVC/SWR Pipe fittings
534 TBSP-H.II-31 75 mm dia - Double Tee with Door - UPVC/SWR Pipe fittings
535 TBSP-H.II-32 90 mm dia - Double Tee with Door - UPVC/SWR Pipe fittings
536 TBSP-H.II-33 110 mm dia - Double Tee with Door - UPVC/SWR Pipe fittings
537 TBSP-H.II-34 75 mm dia - Single 'Y' - UPVC/SWR Pipe fittings
538 TBSP-H.II-35 90 mm dia - Single 'Y' - UPVC/SWR Pipe fittings
539 TBSP-H.II-36 110 mm dia - Single 'Y' - UPVC/SWR Pipe fittings
540 TBSP-H.II-37 75 mm dia - Single 'Y' with Door - UPVC/SWR Pipe fittings
541 TBSP-H.II-38 90 mm dia - Single 'Y' with Door - UPVC/SWR Pipe fittings
542 TBSP-H.II-39 110 mm dia - Single 'Y' with Door - UPVC/SWR Pipe fittings
543 TBSP-H.II-40 75 mm dia - Double 'Y' - UPVC/SWR Pipe fittings
544 TBSP-H.II-41 90 mm dia - Double 'Y' - UPVC/SWR Pipe fittings
545 TBSP-H.II-42 110 mm dia - Double 'Y' - UPVC/SWR Pipe fittings
546 TBSP-H.II-43 75 mm dia - Double 'Y' with Door - UPVC/SWR Pipe fittings
547 TBSP-H.II-44 90 mm dia - Double 'Y' with Door - UPVC/SWR Pipe fittings
548 TBSP-H.II-45 110 mm dia - Double 'Y' with Door - UPVC/SWR Pipe fittings
549 TBSP-H.II-46 75 mm dia - Coupler - UPVC/SWR Pipe fittings
550 TBSP-H.II-47 90 mm dia - Coupler - UPVC/SWR Pipe fittings
551 TBSP-H.II-48 110 mm dia - Coupler - UPVC/SWR Pipe fittings
552 TBSP-H.II-49 90 x 75 mm dia - Reducer - UPVC/SWR Pipe fittings
553 TBSP-H.II-50 110 x 75 mm dia - Reducer - UPVC/SWR Pipe fittings
554 TBSP-H.II-51 90 x 110 mm dia - Reducer - UPVC/SWR Pipe fittings
555 TBSP-H.II-52 63 mm dia - Vent Cowl - UPVC/SWR Pipe fittings
556 TBSP-H.II-53 75 mm dia - Vent Cowl - UPVC/SWR Pipe fittings
557 TBSP-H.II-54 90 mm dia - Vent Cowl - UPVC/SWR Pipe fittings
558 TBSP-H.II-55 110 mm dia - Vent Cowl - UPVC/SWR Pipe fittings
559 TBSP-H.II-56 40 mm dia - Pipe Clip - UPVC/SWR Pipe fittings - Pipe Clip - UPVC/SWR Pipe
fittings
560 TBSP-H.II-57 50 mm dia - Pipe Clip - UPVC/SWR Pipe fittings
561 TBSP-H.II-58 63 mm dia - Pipe Clip - UPVC/SWR Pipe fittings
562 TBSP-H.II-59 75 mm dia - Pipe Clip - UPVC/SWR Pipe fittings
563 TBSP-H.II-60 90 mm dia - Pipe Clip - UPVC/SWR Pipe fittings
564 TBSP-H.II-61 110 mm - Pipe Clip - UPVC/SWR Pipe fittings
565 TBSP-H.II-62 160 mm dia - Pipe Clip - UPVC/SWR Pipe fittings
566 TBSP-H.II-63 P' Trap ( Small without Air vent ) 110 mm - UPVC/SWR Pipe fittings
567 TBSP-H.II-64 P' Trap ( Small with Air vent ) 110 mm - UPVC/SWR Pipe fittings
568 TBSP-H.II-65 P' Trap (Big with Air vent ) 110 mm - UPVC/SWR Pipe fittings
569 TBSP-H.II-66 P' Trap ( Big without Air vent ) 110 mm - UPVC/SWR Pipe fittings
570 TBSP-H.II-67 Floor Trap (Bell Mouth ) 110 mm - UPVC/SWR Pipe fittings
571 TBSP-H.II-68 Bell Mouth Trap 7 " ( 177.8 mm) - UPVC/SWR Pipe fittings
572 TBSP-H.II-69 4" (101.6 mm) Nahany Trap ( Without Jali with inlet) UPVC / SWR Pipe fittings
573 TBSP-H.II-70 3" (75 mm nominal size) Nahany Trap ( without Jali without inlet) UPVC/SWR Pipe
fittings
574 TBSP-H.II-71 4" (101.6 mm ) Nahany Trap ( without inlet without Jali) PVC/SWR Pipe fittings
575 TBSP-H.II-72 Mini Trap - UPVC/SWR Pipe fittings
576 TBSP-H.II-73 3" (75 mm nominal size ) Nahany Trap with Jali - UPVC/SWR Pipe fittings
577 TBSP-H.II-74 4" (101.6 mm ) multi floor trap with Jali- UPVC/SWR Pipe fittings
578 TBSP-H.II-75 4" (101.6) multi floor trap without Jalli- UPVC/SWR Pipe fittings
579 TBSP-H.II-76 Round Jali - UPVC/SWR Pipe fittings
580 TBSP-H.II-77 Square tile & Jalli - UPVC/SWR Pipe fittings
581 TBSP-H.II-78 Pipe connector ( with LIP ring) - UPVC/SWR Pipe fittings
582 TBSP-H.II-79 Pipe connector ( without LIP ring) - UPVC/SWR Pipe fittings
583 TBSP-H.II-80 4" (101.6 mm ) Floor Trap - UPVC/SWR Pipe fittings
584 TBSP-H.II-81 5" (127.mm ) floor Trap - UPVC/SWR Pipe fittings
585 TBSP-H.II-82 75 mm dia - Door cap - UPVC/SWR Pipe fittings
586 TBSP-H.II-83 90 mm dia - Door cap - UPVC/SWR Pipe fittings
587 TBSP-H.II-84 110 mm dia - Door cap - UPVC/SWR Pipe fittings
588 TBSP-H.II-85 75 mm dia - Socket plug - UPVC/SWR Pipe fittings
589 TBSP-H.II-86 90 mm dia - Socket plug - UPVC/SWR Pipe fittings
590 TBSP-H.II-87 110 mm dia - Socket plug - UPVC/SWR Pipe fittings
591 TBSP-H.II-88 75 mm dia - Rubber ring for Socket - UPVC/SWR Pipe fittings
592 TBSP-H.II-89 90 mm dia - Rubber ring for Socket - UPVC/SWR Pipe fittings
593 TBSP-H.II-90 110 mm dia - Rubber ring for Socket - UPVC/SWR Pipe fittings
594 TBSP-H.II-91 75 mm dia - Door Socket - UPVC/SWR Pipe fittings
595 TBSP-H.II-92 90 mm dia - Door Socket - UPVC/SWR Pipe fittings
596 TBSP-H.II-93 110 mm dia - Door Socket - UPVC/SWR Pipe fittings
597 TBSP-H.II-94 LIP ring 110 mm - UPVC/SWR Pipe fittings
598 TBSP-H.II-95 110mm x 90 mm - Internal Reducer - UPVC/SWR Pipe fittings
599 TBSP-H.II-96 160 mm x 110 mm - Internal Reducer - UPVC/SWR Pipe fittings
III SUB-SECTION PVC PLUMBING ACCESSORIES
600 TBSP-H.III-01 Rubber Lubricant - 100 Grams
601 TBSP-H.III-02 Rubber Lubricant - 250 Grams
602 TBSP-H.III-03 Rubber Lubricant - 500 Grams
603 TBSP-H.III-04 Rubber Lubricant - 1000 Grams
604 TBSP-H.III-05 P' Trap with lip UPVC/SWR Pipe fittings
605 TBSP-H.III-06 50 ml - Solvent Cement
606 TBSP-H.III-07 100 ml - Solvent Cement
607 TBSP-H.III-08 250 ml - Solvent Cement
608 TBSP-H.III-09 500 ml - Solvent Cement
609 TBSP-H.III-10 1000 ml - Solvent Cement
IV SUB-SECTION LABOUR CHARGES FOR PVC PLUMBING
610 TBSP-H.IV-01 Labour charges for laying, fixing and commissioning the PVC pipes including
couplers/ bends/ tees etc any diameter including fixing necessary fittings like
bends, plugs, couplers, junctions, tees, etc with solvent jointing as per standard
practice
611 TBSP-H.IV-02 Labour charges for laying, joining, welding, fixing and commissioning the PPR
pipes including all specials such as couplers/ bends/ tees etc including fixing
necessary fittings like bends, plugs, couplers, junctions, tees, etc with welding the
joint as per standard practice - up to 40 mm dia.
612 TBSP-H.IV-03 Labour charges for laying, joining, welding, fixing and commissioning the
PPR pipes including all specials such as couplers/ bends/ tees etc including
fixing necessary fittings like bends, plugs, couplers, junctions, tees, etc with
welding the joint as per standard practice - above 40 mm dia
J SECTION MISCELLANEOUS ITEMS
I SUB-SECTION MISCELLANEOUS PLUMBING WORK ITEMS
613 TBSP-J.I-01 Providing solder joints up to 50 mm nominal size dia pipes including solder materials
and labour charges
614 TBSP-J.I-02 Providing solution joints up to 50 mm nominal size pipes including solution joint
materials and labour charges
615 TBSP-J.I-03 Chiseling the stone masonry wall for fixing of wooden blocks including finishing as
directed by the department
616 TBSP-J.I-04 Chiseling the stone masonry wall and repairs as directed by the department.
617 TBSP-J.I-05 Chiseling the brick masonry wall and repairs as directed by the department.
618 TBSP-J.I-06 Painting the flushing tank with white enamel paint
619 TBSP-J.I-07 S&F internal cistern fittings for PVC flush tank
620 TBSP-J.I-08 Repairing and over hauling flushing tank
621 TBSP-J.I-09 Removing and re-fixing W.C s
622 TBSP-J.I-10 Removing and re-fixing wash hand basins of any size with fittings complete
623 TBSP-J.I-11 Removing 15 mm nominal size GI pipe and re-fixing the same
624 TBSP-J.I-12 Removing 20 mm nominal size GI pipe and re-fixing the same
625 TBSP-J.I-13 Removing 25 mm nominal size GI pipe and re-fixing the same
626 TBSP-J.I-14 Removing 40 mm nominal size GI pipe and re-fixing the same
627 TBSP-J.I-15 Removing 50 mm nominal size GI pipe and re-fixing the same
628 TBSP-J.I-16 Cleaning the W.C with acid and Vim powder
629 TBSP-J.I-17 Cleaning the Urinal with acid and Vim power
630 TBSP-J.I-18 Cleaning the wash basin with acid and Vim powder
631 TBSP-J.I-19 Cleaning the E.W.C with acid and Vim power
632 TBSP-J.I-20 Cutting holes in C.C; basement & repairs Labour charges only
633 TBSP-J.I-21 Cutting holes in stone masonry & basement and repairs Labour charges only
634 TBSP-J.I-22 Cutting holes in Brick masonry & repairs Labour charges only
635 TBSP-J.I-23 Cutting holes in RCC slab floor & repairs Labour charges only
636 TBSP-J.I-24 Supplying & Fixing NP chain rubber and plug for basin
637 TBSP-J.I-25 S&F 25 mm nominal size dia & 609.6 mm long aluminium anodized towel rod with
brackets and aluminium screws
638 TBSP-J.I-26 S & F 19.04 mm dia & 609.6 mm long aluminium anodized towel rod with brackets
and aluminium screws
639 TBSP-J.I-27 S & F 609.6 mm long 127 mm wide plate glass shelf with superior quality aluminium
railing complete with aluminium screws
640 TBSP-J.I-28 S & F 609.6 mm long 127 mm wide plate glass shelf only
641 TBSP-J.I-29 Supplying & fixing 88.9 mm A.C cowls
642 TBSP-J.I-30 Supplying & fixing A.C Cowl 63.5 mm dia
643 TBSP-J.I-31 S & F 76.2 x 101.6 mm teak wood block complete
644 TBSP-J.I-32 Supplying & Fixing 15 mm nominal sizePVC connection with brass union nut C.P
coated
645 TBSP-J.I-33 Removing of 101.6 m or 75 mm nominal size CI pipe
646 TBSP-J.I-34 Supplying & fixing 75 mm nominal size W.I clamps
647 TBSP-J.I-35 Supplying and fixing TV shape mirror with plastic frame size 609.6mm x 457.2 mm
648 TBSP-J.I-36 Supplying & fixing GI pipe plug of size 15 mm nominal size dia
649 TBSP-J.I-37 Supplying & fixing 20 mm dia GI plug
650 TBSP-J.I-38 Supplying and fixing 40 mm nominal size dia of GI plug
651 TBSP-J.I-39 Supplying & fixing 50 mm nominal size dia of GI PLUG
652 TBSP-J.I-40 Supplying & fixing 75 mm nominal size dia of GI PLUG
II SUB-SECTION POLYETHYLENE-ALUMINIUM-POLYETHYLENE COMPOSITE PIPES
653 TBSP-J.II-01 S & F Polyethylene - Aluminium - Polyethylene (PE-AL-PE) composite pressure
pipes conforming to IS-15450-2004 with UV stabilized, carbon black for hot & cold
water supply, capable to withstand pressure up to 80 C including all special
composite fittings, plastic & brass blend inserts for elbows, tees, reducers,
couplers, connectors etc complete for external works including laying pipes,
fixing in position, testing and commissioning etc : 16mm OD pipe

654 TBSP-J.II-02 S & F Polyethylene-Aluminium-Polyethylene (PE-AL-PE) composite pressure


pipes conforming to IS-15450-2004 with UV stabilized, carbon black for hot
& cold water supply, capable to withstand pressure up to 80 C including all special
composite fittings, plastic & brass blend inserts for elbows, tees, reducers,
couplers, connectors etc complete for external works including laying pipes, fixing
in position, testing and commissioning etc : 20mm OD pipe

655 TBSP-J.II-03 S & F Polyethylene-Aluminium-Polyethylene (PE-AL-PE) composite pressure


pipes conforming to IS-15450-2004 with UV stabilized, carbon black for hot &
cold water supply, capable to withstand pressure up to 80 C including all special
composite fittings, plastic & brass blend inserts for elbows, tees, reducers,
couplers,connectors etc complete for external works including laying pipes, fixing
in position, testing and commissioning etc : 25mm OD pipe

656 TBSP-J.II-04 S&F Polyethylene-Aluminium-Polyethylene (PE-AL-PE) composite pressure pipes


conforming to IS-15450-2004 with UV stabilized, carbon black for hot & cold water
supply, capable to withstand pressure up to 80 C including all special composite
fittings, plastic & brass blend inserts for elbows, tees, reducers, couplers, connectors
etc complete for external works including laying pipes, fixing in position, testing and
commissioning etc : 32 mm OD pipe

657 TBSP-J.II-05 S&F Polyethylene-Aluminium-Polyethylene (PE-AL-PE)


composite pressure pipes conforming to IS-15450-2004
with UV stabilized, carbon black for hot & cold water
supply, capable to withstand pressure up to 80 C including
all special composite fittings, plastic & brass blend inserts
for elbows, tees, reducers, couplers, connectors etc
complete for external works including laying pipes, fixing
in position, testing and commissioning etc : 40 mm OD
pipe

658 TBSP-J.II-06 S&F Polyethylene-Aluminium-Polyethylene (PE-AL-PE)


composite pressure pipes conforming to IS-15450-2004
with UV stabilized, carbon black for hot & cold water
supply, capable to withstand pressure up to 80 C including
all special composite fittings, plastic & brass blend inserts
for elbows, tees, reducers, couplers, connectors etc
complete for external works including laying pipes, fixing
in position, testing and commissioning etc : 50 mm OD
pipe
659 TBSP-J.II-07 S&F Polyethylene-Aluminium-Polyethylene (PE-AL-PE)
composite pressure pipes conforming to IS-15450-2004
with UV stabilized, carbon black for hot & cold water
supply, capable to withstand pressure up to 80 C including
all special composite fittings, plastic & brass blend inserts
for elbows, tees, reducers, couplers, connectors etc
complete with MS Iron clamps at 1.0 M spacing including
cutting, chasing walls, making good, laying pipes, fixing in
position, testing and commissioning etc 16 mm OD pipe

660 TBSP-J.II-08 S&F Polyethylene-Aluminium-Polyethylene (PE-AL-PE)


composite pressure pipes conforming to IS-15450-2004
with UV stabilized, carbon black for hot & cold water
supply, capable to withstand pressure up to 80 C including
all special composite fittings, plastic & brass blend inserts
for elbows, tees, reducers, couplers, connectors etc
complete with MS Iron clamps at 1.0 M spacing including
cutting, chasing walls, making good, laying pipes, fixing in
position, testing and commissioning etc 20 mm OD pipe

661 TBSP-J.II-09 S&F Polyethylene-Aluminium-Polyethylene (PE-AL-PE)


composite pressure pipes conforming to IS-15450-2004
with UV stabilized, carbon black for hot & cold water
supply, capable to withstand pressure up to 80 C including
all special composite fittings, plastic & brass blend inserts
for elbows, tees, reducers, couplers, connectors etc
complete with MS Iron clamps at 1.0 M spacing including
cutting, chasing walls, making good, laying pipes, fixing in
position, testing and commissioning etc 25mm OD pipe

662 TBSP-J.II-10 S&F Polyethylene-Aluminium-Polyethylene (PE-AL-PE) composite pressure pipes


conforming to IS-15450-2004 with UV stabilized, carbon black for hot & cold water
supply, capable to withstand pressure up to 80 C including all special composite
fittings, plastic & brass blend inserts for elbows, tees, reducers, couplers, connectors
etc complete with MS Iron clamps at 1.0 M spacing including cutting, chasing walls,
making good, laying pipes, fixing in position, testing and commissioning etc 32 mm
OD pipe

663 TBSP-J.II-11 S&F Polyethylene-Aluminium-Polyethylene (PE-AL-PE) composite pressure


pipes conforming to IS-15450-2004 with UV stabilized, carbon black for hot
& cold water supply, capable to withstand pressure up to 80 C including all
special composite fittings, plastic & brass blend inserts for elbows, tees,
reducers, couplers, connectors etc complete with MS Iron clamps at 1.0 M
spacing including
cutting, chasing walls, making good, laying pipes, fixing in
position, testing and commissioning etc 40 mm OD pipe

664 TBSP-J.II-12 S&F Polyethylene-Aluminium-Polyethylene (PE-AL-PE)


composite pressure pipes conforming to IS-15450-2004
with UV stabilized, carbon black for hot & cold water
supply, capable to withstand pressure up to 80 C including
all special composite fittings, plastic & brass blend inserts
for elbows, tees, reducers, couplers, connectors etc
complete with MS Iron clamps at 1.0 M spacing including
cutting, chasing walls, making good, laying pipes, fixing in
position, testing and commissioning etc 50 mm OD pipe
665 TBSP-J.II-13 S&F Polyethylene-Aluminium-Polyethylene (PE-AL-PE)
composite pressure pipes conforming to IS-15450-2004
with UV stabilized, carbon black for hot & cold water
supply, capable to withstand pressure up to 80 C including
all special composite fittings, plastic & brass blend inserts
for elbows, tees, reducers, couplers, connectors etc
complete including excavating trenches up to 1.0 M deep
laying pipes, fixing in position, testing, refilling excavated
earth and commissioning etc 16 mm OD pipe

666 TBSP-J.II-14 S&F Polyethylene-Aluminium-Polyethylene (PE-AL-PE)


composite pressure pipes conforming to IS-15450-2004
with UV stabilized, carbon black for hot & cold water
supply, capable to withstand pressure up to 80 C including
all special composite fittings, plastic & brass blend inserts
for elbows, tees, reducers, couplers, connectors etc
complete including excavating trenches up to 1.0 M deep
laying pipes, fixing in position, testing, refilling excavated
earth and commissioning etc 20 mm OD pipe

667 TBSP-J.II-15 S&F Polyethylene-Aluminium-Polyethylene (PE-AL-PE)


composite pressure pipes conforming to IS-15450-2004
with UV stabilized, carbon black for hot & cold water
supply, capable to withstand pressure up to 80 C including
all special composite fittings, plastic & brass blend inserts
for elbows, tees, reducers, couplers, connectors etc
complete including excavating trenches up to 1.0 M deep
laying pipes, fixing in position, testing, refilling excavated
earth and commissioning etc 25mm OD pipe

668 TBSP-J.II-16 S&F Polyethylene-Aluminium-Polyethylene (PE-AL-PE)


composite pressure pipes conforming to IS-15450-2004
with UV stabilized, carbon black for hot & cold water
supply, capable to withstand pressure up to 80 C including
all special composite fittings, plastic & brass blend inserts
for elbows, tees, reducers, couplers, connectors etc
complete including excavating trenches up to 1.0 M deep
laying pipes, fixing in position, testing, refilling excavated
earth and commissioning etc 32 mm OD pipe

669 TBSP-J.II-17 S&F Polyethylene-Aluminium-Polyethylene (PE-AL-PE)


composite pressure pipes conforming to IS-15450-2004
with UV stabilized, carbon black for hot & cold water
supply, capable to withstand pressure up to 80 C including
all special composite fittings, plastic & brass blend inserts
for elbows, tees, reducers, couplers, connectors etc
complete including excavating trenches up to 1.0 M deep
laying pipes, fixing in position, testing, refilling excavated
earth and commissioning etc 40 mm OD pipe

III SUB-SECTION OTHER VARIETIES OF PIPES


670 TBSP-J.III-01 S&F premium make CPVC Pipes of 15.90mm OD Pipe - SDR 13.5
671 TBSP-J.III-02 S&F premium make CPVC Pipes of 22.20mm OD Pipe - SDR 13.5
672 TBSP-J.III-03 S&F premium make CPVC Pipes of 28.60mm OD Pipe - SDR 13.5
673 TBSP-J.III-04 S&F premium make CPVC Pipes of 34.90mm OD Pipe - SDR 13.5
674 TBSP-J.III-05 S&F premium make CPVC Pipes of 41.30mm OD Pipe - SDR 13.5
675 TBSP-J.III-06 S&F premium make CPVC Pipes of 54.00mm OD Pipe - SDR 13.5
676 TBSP-J.III-07 S&F premium make CPVC Pipes of 15.90mm OD Pipe - SDR 11
677 TBSP-J.III-08 S&F premium make CPVC Pipes of 22.20mm OD Pipe - SDR 11
678 TBSP-J.III-09 S&F premium make CPVC Pipes of 28.60mm OD Pipe - SDR 11
679 TBSP-J.III-10 S&F premium make CPVC Pipes of 34.90mm OD Pipe - SDR 11
680 TBSP-J.III-11 S&F premium make CPVC Pipes of 41.30mm OD Pipe - SDR 11
681 TBSP-J.III-12 S&F premium make CPVC Pipes of 54.00mm OD Pipe - SDR 11
682 TBSP-J.III-13 Supply of 20mm x 1.9mm PN 10/PPR pipe conforming to DIN Standards 8077 /
8078
683 TBSP-J.III-14 Supply of 25mm x 2.3mm PN 10/PPR pipe conforming to DIN Standards 8077/8078

684 TBSP-J.III-15 Supply of 32mm x 2.9mm PN 10/PPR pipe conforming to DIN Standards
8077/8079
685 TBSP-J.III-16 Supply of 40mm x 3.7mm PN 10/PPR pipe conforming to DIN Standards
8077/8079
686 TBSP-J.III-17 Supply of 50mm x 4.6mm PN 10/PPR pipe conforming to DIN Standards
8077/8080
687 TBSP-J.III-18 Supply of 63mm x 5.8mm PN 10/PPR pipe conforming to DIN Standards
8077/8081
688 TBSP-J.III-19 Supply of 75mm x 6.8mm PN 10/PPR pipe conforming to DIN Standards
8077/8082
689 TBSP-J.III-20 Supply of 90mm x 8.2mm PN 10/PPR pipe conforming to DIN Standards
8077/8083
690 TBSP-J.III-21 Supply of 110mm x 10mm PN 10/PPR pipe conforming to DIN Standards
8077/8084
691 TBSP-J.III-22 Supply of 20mm x 2.8mm PN 16/PPR pipe conforming to DIN Standards
8077/8078
692 TBSP-J.III-23 Supply of 25mm x 3.5mm PN 16/PPR pipe conforming to DIN Standards
8077/8078
693 TBSP-J.III-24 Supply of 32mm x 4.4mm PN 16/PPR pipe conforming to DIN Standards
8077/8079
694 TBSP-J.III-25 Supply of 40mm x 5.5mm PN 16/PPR pipe conforming to DIN Standards
8077/8079
695 TBSP-J.III-26 Supply of 50mm x 6.9mm PN 16/PPR pipe conforming to DIN Standards
8077/8080
696 TBSP-J.III-27 Supply of 63mm x 8.6mm PN 16/PPR pipe conforming to DIN Standards
8077/8081
697 TBSP-J.III-28 Supply of 75mm x 10.3mm PN 16/PPR pipe conforming to DIN Standards
8077/8082
698 TBSP-J.III-29 Supply of 90mm x 12.3mm PN 16/PPR pipe conforming to DIN Standards
8077/8083
699 TBSP-J.III-30 Supply of 110mm x 15.1mm PN 16/PPR pipe conforming to DIN Standards
8077/8084
700 TBSP-J.III-31 Supply of 20mm x 3.4mm PN 20/PPR pipe conforming to DIN Standards
8077/8078
701 TBSP-J.III-32 Supply of 25mm x 4.2mm PN 20/PPR pipe conforming to DIN Standards
8077/8078
702 TBSP-J.III-33 Supply of 32mm x 5.4mm PN 20/PPR pipe conforming to DIN Standards
8077/8079
703 TBSP-J.III-34 Supply of 40mm x 6.7mm PN 20/PPR pipe conforming to DIN Standards
8077/8079
704 TBSP-J.III-35 Supply of 50mm x 8.3mm PN 20/PPR pipe conforming to DIN Standards
8077/8080
705 TBSP-J.III-36 Supply of 63mm x 10.5mm PN 20/PPR pipe conforming to DIN Standards
8077/8081
706 TBSP-J.III-37 Supply of 75mm x 12.5mm PN 20/PPR pipe conforming to DIN Standards
8077/8082
707 TBSP-J.III-38 Supply of 90mm x 15mm PN 20/PPR pipe conforming to DIN Standards
8077/8083
708 TBSP-J.III-39 Supply of 110mm x 18.3mm PN 20/PPR pipe conforming to DIN Standards
8077/8084
709 TBSP-J.III-40 Supply of 20mm PPR Socket conforming to DIN Standards 8077/8084
710 TBSP-J.III-41 Supply of 25mm PPR Socket conforming to DIN Standards 8077/8085
711 TBSP-J.III-42 Supply of 32mm PPR Socket conforming to DIN Standards 8077/8086
712 TBSP-J.III-43 Supply of 40mm PPR Socket conforming to DIN Standards 8077/8087
713 TBSP-J.III-44 Supply of 50mm PPR Socket conforming to DIN Standards 8077/8088
714 TBSP-J.III-45 Supply of 63mm PPR Socket conforming to DIN Standards 8077/8089
715 TBSP-J.III-46 Supply of 75mm PPR Socket conforming to DIN Standards 8077/8090
716 TBSP-J.III-47 Supply of 90mm PPR Socket conforming to DIN Standards 8077/8091
717 TBSP-J.III-48 Supply of 110mm PPR Socket conforming to DIN Standards 8077/8092
718 TBSP-J.III-49 Supply of 32mm PPR Core Flange conforming to DIN Standards 8077/8086
719 TBSP-J.III-50 Supply of 40mm PPR Core Flange conforming to DIN Standards 8077/8087
720 TBSP-J.III-51 Supply of 50mm PPR Core Flange conforming to DIN Standards 8077/8088
721 TBSP-J.III-52 Supply of 63mm PPR Core Flange conforming to DIN Standards 8077/8089
722 TBSP-J.III-53 Supply of 75mm PPR Core Flange conforming to DIN Standards 8077/8090
723 TBSP-J.III-54 Supply of 90mm PPR Core Flange conforming to DIN Standards 8077/8091
724 TBSP-J.III-55 Supply of 110mm PPR Core Flange conforming to DIN Standards 8077/8092
725 TBSP-J.III-56 Supply of 20mm PPR Elbow conforming to DIN Standards 8077/8084
726 TBSP-J.III-57 Supply of 25mm PPR Elbow conforming to DIN Standards 8077/8085
727 TBSP-J.III-58 Supply of 32mm PPR Elbow conforming to DIN Standards 8077/8086
728 TBSP-J.III-59 Supply of 40mm PPR Elbow conforming to DIN Standards 8077/8087
729 TBSP-J.III-60 Supply of 50mm PPR Elbow conforming to DIN Standards 8077/8088
730 TBSP-J.III-61 Supply of 63mm PPR Elbow conforming to DIN Standards 8077/8089
731 TBSP-J.III-62 Supply of 75mm PPR Elbow conforming to DIN Standards 8077/8090
732 TBSP-J.III-63 Supply of 90mm PPR Elbow conforming to DIN Standards 8077/8091
733 TBSP-J.III-64 Supply of 110mm PPR Elbow conforming to DIN Standards 8077/8092
734 TBSP-J.III-65 Supply of 20mm PPR Tee conforming to DIN Standards 8077/8084
735 TBSP-J.III-66 Supply of 25mm PPR Tee conforming to DIN Standards 8077/8085
736 TBSP-J.III-67 Supply of 32mm PPR Tee conforming to DIN Standards 8077/8086
737 TBSP-J.III-68 Supply of 40mm PPR Tee conforming to DIN Standards 8077/8087
738 TBSP-J.III-69 Supply of 50mm PPR Tee conforming to DIN Standards 8077/8088
739 TBSP-J.III-70 Supply of 63mm PPR Tee conforming to DIN Standards 8077/8089
740 TBSP-J.III-71 Supply of 75mm PPR Tee conforming to DIN Standards 8077/8090
741 TBSP-J.III-72 Supply of 90mm PPR Tee conforming to DIN Standards 8077/8091
742 TBSP-J.III-73 Supply of 110mm PPR Tee conforming to DIN Standards 8077/8092
743 TBSP-J.III-74 Supply of 20mm PPR End Cap conforming to DIN Standards 8077/8084
744 TBSP-J.III-75 Supply of 25mm PPR End Cap conforming to DIN Standards 8077/8085
745 TBSP-J.III-76 Supply of 32mm PPR End Cap conforming to DIN Standards 8077/8086
746 TBSP-J.III-77 Supply of 40mm PPR End Cap conforming to DIN Standards 8077/8087
747 TBSP-J.III-78 Supply of 50mm PPR End Cap conforming to DIN Standards 8077/8088
748 TBSP-J.III-79 Supply of 63mm PPR End Cap conforming to DIN Standards 8077/8089
749 TBSP-J.III-80 Supply of 75mm PPR End Cap conforming to DIN Standards 8077/8090
750 TBSP-J.III-81 Supply of 90mm PPR End Cap conforming to DIN Standards 8077/8091
751 TBSP-J.III-82 Supply of 110mm PPR End Cap conforming to DIN Standards 8077/8092
752 TBSP-J.III-83 Supply of 25mm x 20mm PPR Reducer conforming to DIN Standards 8077/8092

753 TBSP-J.III-84 Supply of 32mm x 25mm PPR Reducer conforming to DIN Standards 8077/8092

754 TBSP-J.III-85 Supply of 32mm x 20mm PPR Reducer conforming to DIN Standards 8077/8092

755 TBSP-J.III-86 Supply of 40mm x 32mm PPR Reducer conforming to DIN Standards 8077/8092
756 TBSP-J.III-87 Supply of 40mm x 25mm PPR Reducer conforming to DIN Standards 8077/8092

757 TBSP-J.III-88 Supply of 40mm x 20mm PPR Reducer conforming to DIN Standards 8077/8092

758 TBSP-J.III-89 Supply of 50mm x 20mm PPR Reducer conforming to DIN Standards 8077/8092

759 TBSP-J.III-90 Supply of 50mm x 25mm PPR Reducer conforming to DIN Standards 8077/8092

760 TBSP-J.III-91 Supply of 50mm x 32mm PPR Reducer conforming to DIN Standards 8077/8092

761 TBSP-J.III-92 Supply of 50mm x 40mm PPR Reducer conforming to DIN Standards 8077/8092

762 TBSP-J.III-93 Supply of 63mm x 20mm PPR Reducer conforming to DIN Standards 8077/8092

763 TBSP-J.III-94 Supply of 63mm x 25mm PPR Reducer conforming to DIN Standards 8077/8092

764 TBSP-J.III-95 Supply of 63mm x 32mm PPR Reducer conforming to DIN Standards 8077/8092

765 TBSP-J.III-96 Supply of 63mm x 40mm PPR Reducer conforming to DIN Standards 8077/8092

766 TBSP-J.III-97 Supply of 63mm x 50mm PPR Reducer conforming to DIN Standards 8077/8092

767 TBSP-J.III-98 Supply of 75mm x 40mm PPR Reducer conforming to DIN Standards 8077/8092

768 TBSP-J.III-99 Supply of 75mm x 50mm PPR Reducer conforming to DIN Standards 8077/8092

769 TBSP-J.III-100 Supply of 75mm x 63mm PPR Reducer conforming to DIN Standards 8077/8092

770 TBSP-J.III-101 Supply of 90mm x 63mm PPR Reducer conforming to DIN Standards 8077/8092

771 TBSP-J.III-102 Supply of 90mm x 75mm PPR Reducer conforming to DIN Standards 8077/8092

772 TBSP-J.III-103 Supply of 110mm x 63mm PPR Reducer conforming to DIN Standards 8077/8092

773 TBSP-J.III-104 Supply of 110mm x 75mm PPR Reducer conforming to DIN Standards 8077/8092

774 TBSP-J.III-105 Supply of 110mm x 90mm PPR Reducer conforming to DIN Standards 8077/8092

775 TBSP-J.III-106 Supply of 25mm x 20mm x 25mm PPR Reducer Tee conforming to
DIN Standards 8077/8092
776 TBSP-J.III-107 Supply of 32mm x 25mm x 32mm PPR Reducer Tee conforming to
DIN Standards 8077/8092
777 TBSP-J.III-108 Supply of 32mm x 20mm x 32mm PPR Reducer Tee
conforming to DIN Standards 8077/8092
778 TBSP-J.III-109 Supply of 40mm x 20mm x 40mm PPR Reducer Tee
conforming to DIN Standards 8077/8092
779 TBSP-J.III-110 Supply of 40mm x 25mm x 40mm PPR Reducer Tee
conforming to DIN Standards 8077/8092
780 TBSP-J.III-111 Supply of 40mm x 32mm x 40mm PPR Reducer Tee
conforming to DIN Standards 8077/8092
781 TBSP-J.III-112 Supply of 50mm x 20mm x 50mm PPR Reducer Tee
conforming to DIN Standards 8077/8092
782 TBSP-J.III-113 Supply of 50mm x 25mm x 50mm PPR Reducer Tee
conforming to DIN Standards 8077/8092
783 TBSP-J.III-114 Supply of 50mm x 32mm x 50mm PPR Reducer Tee
conforming to DIN Standards 8077/8092
784 TBSP-J.III-115 Supply of 50mm x 40mm x 50mm PPR Reducer Tee
conforming to DIN Standards 8077/8092
785 TBSP-J.III-116 Supply of 63mm x 20mm x 63mm PPR Reducer Tee
conforming to DIN Standards 8077/8092
786 TBSP-J.III-117 Supply of 63mm x 25mm x 63mm PPR Reducer Tee
conforming to DIN Standards 8077/8092
787 TBSP-J.III-118 Supply of 63mm x 32mm x 63mm PPR Reducer Tee
conforming to DIN Standards 8077/8092
788 TBSP-J.III-119 Supply of 63mm x 40mm x 63mm PPR Reducer Tee
conforming to DIN Standards 8077/8092
789 TBSP-J.III-120 Supply of 63mm x 50mm x 63mm PPR Reducer Tee
conforming to DIN Standards 8077/8092
790 TBSP-J.III-121 Supply of 75mm x 50mm x 75mm PPR Reducer Tee
conforming to DIN Standards 8077/8092
791 TBSP-J.III-122 Supply of 75mm x 63mm x 75mm PPR Reducer Tee
conforming to DIN Standards 8077/8092
792 TBSP-J.III-123 Supply of 90mm x 50mm x 90mm PPR Reducer Tee
conforming to DIN Standards 8077/8092
793 TBSP-J.III-124 Supply of 90mm x 63mm x 90mm PPR Reducer Tee
conforming to DIN Standards 8077/8092
794 TBSP-J.III-125 Supply of 110mm x 75mm x 110mm PPR Reducer Tee
conforming to DIN Standards 8077/8092
795 TBSP-J.III-126 Supply of 110mm x 90mm x 110mm PPR Reducer Tee
conforming to DIN Standards 8077/8092
796 TBSP-J.III-127 Supply of 20mm x ½” PPR Female Threaded Adaptor
conforming to DIN Standards 8077/8092
797 TBSP-J.III-128 Supply of 25mm x ½” PPR Female Threaded Adaptor
conforming to DIN Standards 8077/8092
798 TBSP-J.III-129 Supply of 25mm x ¾” PPR Female Threaded Adaptor
conforming to DIN Standards 8077/8092
799 TBSP-J.III-130 Supply of 32mm x ½” PPR Female Threaded Adaptor
conforming to DIN Standards 8077/8092
800 TBSP-J.III-131 Supply of 32mm x ¾” PPR Female Threaded Adaptor
conforming to DIN Standards 8077/8092
801 TBSP-J.III-132 Supply of 32mm x 1" PPR Female Threaded Adaptor
conforming to DIN Standards 8077/8092
802 TBSP-J.III-133 Supply of 40mm x 1¼” PPR Female Threaded Adaptor
conforming to DIN Standards 8077/8092
803 TBSP-J.III-134 Supply of 50mm x 1½” PPR Female Threaded Adaptor
conforming to DIN Standards 8077/8092
804 TBSP-J.III-135 Supply of 63mm x 2" PPR Female Threaded Adaptor
conforming to DIN Standards 8077/8092
805 TBSP-J.III-136 Supply of 75mm x 2½”PPR Female Threaded Adaptor
conforming to DIN Standards 8077/8092
806 TBSP-J.III-137 Supply of 20mm x ½” PPR Male Threaded Adaptor
conforming to DIN Standards 8077/8092
807 TBSP-J.III-138 Supply of 25mm x ½” PPR Male Threaded Adaptor
conforming to DIN Standards 8077/8092
808 TBSP-J.III-139 Supply of 25mm x ¾” PPR Male Threaded Adaptor
conforming to DIN Standards 8077/8092
809 TBSP-J.III-140 Supply of 32mm x ¾” PPR Male Threaded Adaptor
conforming to DIN Standards 8077/8092
810 TBSP-J.III-141 Supply of 32mm x 1" PPR Male Threaded Adaptor
conforming to DIN Standards 8077/8092
811 TBSP-J.III-142 Supply of 40mm x 1¼” PPR Male Threaded Adaptor
conforming to DIN Standards 8077/8092
812 TBSP-J.III-143 Supply of 50mm x 1½” PPR Male Threaded Adaptor
conforming to DIN Standards 8077/8092
813 TBSP-J.III-144 Supply of 63mm x 2" PPR Male Threaded Adaptor
conforming to DIN Standards 8077/8092
814 TBSP-J.III-145 Supply of 75mm x 2½”PPR Male Threaded Adaptor
conforming to DIN Standards 8077/8092
815 TBSP-J.III-146 Supply of 20mm x ½” PPR Female Threaded Elbow
conforming to DIN Standards 8077/8092

816 TBSP-J.III-147 Supply of 25mm x ½” PPR Female Threaded Elbow


conforming to DIN Standards 8077/8092

817 TBSP-J.III-148 Supply of 25mm x ¾” PPR Female Threaded Elbow


conforming to DIN Standards 8077/8092

818 TBSP-J.III-149 Supply of 32mm x ½” PPR Female Threaded Elbow


conforming to DIN Standards 8077/8092

819 TBSP-J.III-150 Supply of 32mm x ¾” PPR Female Threaded Elbow


conforming to DIN Standards 8077/8092

820 TBSP-J.III-151 Supply of 32mm x 1" PPR Female Threaded Elbow


conforming to DIN Standards 8077/8092

821 TBSP-J.III-152 Supply of 20mm x ½” PPR Male Threaded Elbow


conforming to DIN Standards 8077/8092

822 TBSP-J.III-153 Supply of 25mm x ½” PPR Male Threaded Elbow


conforming to DIN Standards 8077/8092

823 TBSP-J.III-154 Supply of 25mm x ¾” PPR Male Threaded Elbow


conforming to DIN Standards 8077/8092

824 TBSP-J.III-155 Supply of 32mm x ½” PPR Male Threaded Elbow


conforming to DIN Standards 8077/8092

825 TBSP-J.III-156 Supply of 32mm x1" PPR Male Threaded Elbow


conforming to DIN Standards 8077/8092

826 TBSP-J.III-157 Supply of 20mm x ½” PPR Female Threaded Tee


conforming to DIN Standards 8077/8092

827 TBSP-J.III-158 Supply of 25mm x ½” PPR Female Threaded Tee


conforming to DIN Standards 8077/8092

828 TBSP-J.III-159 Supply of 25mm x ¾” PPR Female Threaded Tee


conforming to DIN Standards 8077/8092

829 TBSP-J.III-160 Supply of 32mm x ½” PPR Female Threaded Tee


conforming to DIN Standards 8077/8092

830 TBSP-J.III-161 Supply of 32mm x ¾” PPR Female Threaded Tee


conforming to DIN Standards 8077/8092

831 TBSP-J.III-162 Supply of 32mm x 1" PPR Female Threaded Tee


conforming to DIN Standards 8077/8092

832 TBSP-J.III-163 Supply of 20mm x ½” PPR Male Threaded Teeconforming


to DIN Standards 8077/8092

833 TBSP-J.III-164 Supply of 25mm x ½” PPR Male Threaded Tee conforming


to DIN Standards 8077/8092

834 TBSP-J.III-165 Supply of 25mm x ¾” PPR Male Threaded Tee conforming


to DIN Standards 8077/8092
835 TBSP-J.III-166 Supply of 32mm x ½” PPR Male Threaded Tee conforming
to DIN Standards 8077/8092

836 TBSP-J.III-167 Supply of 32mm x ¾” PPR Male Threaded Tee


conforming to DIN Standards 8077/8092

837 TBSP-J.III-168 Supply of 32mm x 1" PPR Male Threaded Tee conforming
to DIN Standards 8077/8092

838 TBSP-J.III-169 Supply of 20mm x ½” PPR Female Threaded Union


conforming to DIN Standards 8077/8092

839 TBSP-J.III-170 Supply of 25mm x ¾” PPR Female Threaded Union


conforming to DIN Standards 8077/8092

840 TBSP-J.III-171 Supply of 32mm x 1” PPR Female Threaded Union


conforming to DIN Standards 8077/8092

841 TBSP-J.III-172 Supply of 40mm x 1¼” PPR Female Threaded Union


conforming to DIN Standards 8077/8092

842 TBSP-J.III-173 Supply of 50mm x 1½” PPR Female Threaded Union


conforming to DIN Standards 8077/8092

843 TBSP-J.III-174 Supply of 63mm x 2” PPR Female Threaded Union


conforming to DIN Standards 8077/8092

844 TBSP-J.III-175 Supply of 20mm x ½” PPR Male Threaded Union


conforming to DIN Standards 8077/8092

845 TBSP-J.III-176 Supply of 25mm x ¾” PPR Male Threaded Union


conforming to DIN Standards 8077/8092

846 TBSP-J.III-177 Supply of 32mm x 1” PPR Male Threaded Union


conforming to DIN Standards 8077/8092

847 TBSP-J.III-178 Supply of 40mm x 1¼” PPR Male Threaded Union


conforming to DIN Standards 8077/8092

848 TBSP-J.III-179 Supply of 50mm x 1½” PPR Male Threaded Union


conforming to DIN Standards 8077/8092

849 TBSP-J.III-180 Supply of 63mm x 2” PPR Male Threaded Union


conforming to DIN Standards 8077/8092

850 TBSP-J.III-181 Supply of 20mm PPR Union conforming to DIN Standards 8077/8092
851 TBSP-J.III-182 Supply of 25mm PPR Union conforming to DIN Standards 8077/8092
852 TBSP-J.III-183 Supply of 32mm PPR Union conforming to DIN Standards 8077/8092
853 TBSP-J.III-184 Supply of 20mm PPR Ball Valve conforming to DIN Standards 8077/8092
854 TBSP-J.III-185 Supply of 25mm PPR Ball Valve conforming to DIN Standards 8077/8092
855 TBSP-J.III-186 Supply of 32mm PPR Ball Valve conforming to DIN Standards 8077/8092
856 TBSP-J.III-187 Supply of 40mm PPR Ball Valve conforming to DIN Standards 8077/8092
857 TBSP-J.III-188 Supply of 50mm PPR Ball Valve conforming to DIN Standards 8077/8092
858 TBSP-J.III-189 Supply of 63mm PPR Ball Valve conforming to DIN Standards 8077/8092
859 TBSP-J.III-190 Supply of 75mm PPR Ball Valve conforming to DIN Standards 8077/8092
860 TBSP-J.III-191 Supply of 90mm PPR Ball Valve conforming to DIN Standards 8077/8092
861 TBSP-J.III-192 Supply of 20mm PPR Clamp conforming to DIN Standards 8077/8092
862 TBSP-J.III-193 Supply of 25mm PPR Clamp conforming to DIN Standards 8077/8092
863 TBSP-J.III-194 Supply of 32mm PPR Clamp conforming to DIN Standards 8077/8092
864 TBSP-J.III-195 Supply of 40mm PPR Clamp conforming to DIN Standards 8077/8092
NOTE
1 All the items to be used on work are of first quality & ISI and as approved by the Engineer In charge of the
2 RATES
Note: All the prices of the material given in this section are landing costs, including material
VAT,
a) loading,
Supply cost
Rates for of
all conveyance, unloading
the materials are & stacking
based on at site.
market rates plus Sales Tax/ Material VAT.
3 b) Works Contract VAT for General/ Composition Scheme on finished items may be allowed as
applicable.
LABOUR charges have been increased based on the Common SoR
Coloured porcelain items: 50% extra may be allowed on basic cost of white porcelain items
excluding
SoR Ratesfittings
for sanitary & water supply items are purely for the guidance of the officers in preparation
of estimates vide Para 113 of APPWD code. Authority who prepares the estimate is however
responsible for proper rates as envisaged in Para 45 of APPWD code.
September 2018-19

ER SUPPLY & SANITARY ITEMS

SS RATE FOR 2018-19

4 5
Unit Rate

1 RM 491.00

1 RM 423.00

1 RM 708.00

1 RM 630.00

1 RM 138.00

1 RM 237.00

1 RM 95.00

1 RM 178.00

Each 619.00

1 RM 188.00
1 RM 326.00
1 RM 504.00
1 RM 922.00
1 RM 1330.00
1 RM 1810.00
1 RM 233.00
1 RM 346.00
1 RM 622.00
1 RM 977.00
1 RM 1502.00
1 RM 1947.00
1 RM 2242.00
1 RM 2863.00
1 RM 297.00
1 RM 431.00
1 RM 763.00
1 RM 1159.00
1 RM 1619.00
1 RM 2055.00
1 RM 2365.00
1 RM 3219.00
1 RM 95.00
Each 176.00
Each 330.00
Each 668.00
Each 849.00
Each 1060.00
Each 182.00

Each 268.00

Each 292.00

Each 416.00

Each 487.00

Each 558.00

Each 657.00

Each 866.00

Each 1071.00

Each 1283.00

Each 935.00

Each 1197.00

Each 1468.00

Each 1724.00

Each 1985.00

Each 1166.00

Each 1496.00

Each 1823.00

Each 2150.00

Each 2480.00
Each 2805.00

Each 35.00
Each 67.00
Each 125.00
Each 217.00
Each 343.00
Each 430.00
Each 264.00

Each 193.00
Each 330.00
Each 534.00
Each 40.00

Each 58.00

Each 78.00

Each 130.00

1 RM 252.00

1 RM 313.00

1 RM 40.00

1 RM 54.00

Each 33.00

Each 7338.00
Each 11694.00

Each 7321.00

Each 11,649.00

Each 6324.00

Each 3813.00

Each 473.00

Each 76.00

Each 732.00

Each 124.00
Each 20.00
Each 50.00
Each 2013.00

Each 2998.00
Each 65.00
Each 1295.00

Each 2674.00

Each 130.00

1 RM 751.00

1 RM 988.00

1 RM 1580.00

1 RM 822.00

1 RM 1097.00

1 RM 1821.00
Each 293.00

Each 372.00

Each 617.00

Each 363.00

Each 450.00

Each 983.00

Each 457.00

Each 715.00

Each 1695.00

Each 384.00

Each 526.00

Each 1262.00

Each 696.00

Each 846.00

Each 1977.00

Each 602.00

Each 790.00

Each 1851.00

Each 295.00

Each 412.00

Each 899.00

Each 351.00

Each 468.00
Each 921.00

Each 406.00

Each 526.00

Each 1070.00

Each 533.00

Each 653.00

Each 326.00

Each 179.00

Each 225.00

Each 645.00

1 RM 246.00

Each 78.00

Each 98.00

Each 106.00

Each 49.00

Each 64.00

Each 207.00
Each 415.00

Each 1484.00
Each 1975.00
Each 3620.00
Each 1647.00
Each 2222.00
Each 1334.00
Each 1782.00
Each 1194.00
Each 1587.00
Each 971.00
Each 1267.00
Each 1021.00
Each 1267.00

Each 354.00
Each 407.00
Each 508.00
Each 583.00
Each 1112.00
Each 699.00
Each 772.00
Each 1393.00
Each 1072.00
Each 1447.00
Each 1180.00
Each 1766.00
Each 365.00
Each 429.00
Each 1022.00
Each 377.00
Each 489.00
Each 1118.00
Each 365.00
Each 429.00
Each 1022.00
Each 377.00

Each 489.00

Each 1118.00
Each 742.00
Each 866.00
Each 388.00
Each 496.00

Each 1053.00
Each 489.00
Each 659.00
Each 1360.00
Each 576.00
Each 765.00
Each 1436.00
Each 576.00
Each 765.00
Each 1685.00
Each 631.00
Each 844.00
Each 1816.00
Each 668.00
Each 898.00
Each 744.00
Each 937.00
Each 744.00
Each 937.00
Each 785.00
Each 1017.00
Each 460.00
Each 538.00
Each 1093.00
Each 315.00
Each 382.00
Each 785.00
Each 278.00
Each 315.00
Each 707.00
Each 403.00
Each 489.00
Each 987.00
Each 440.00
Each 576.00
Each 1149.00
Each 926.00
Each 996.00
Each 532.00
Each 724.00
Each 965.00
Each 576.00
Each 790.00
Each 905.00
Each 905.00
Each 562.00
Each 770.00
Each 481.00

Each 750.00

Each 750.00

Each 750.00

Each 750.00
Each 794.00
Each 794.00
Each 848.00
Each 1110.00
Each 1203.00
Each 1272.00
Each 1554.00
Each 1611.00
Each 2263.00
Each 1799.00
Each 2486.00
Each 1799.00
Each 2486.00
Each 2006.00
Each 2730.00
Each 865.00

Each 865.00

Each 1306.00

Each 1373.00

Pair 210.00

Each 271.00

Each 81.00

Each 1534.00

Each 1619.00

Each 5440.00

Each 7986.00

Each 11672.00
Each 14866.00

Each 8478.00

Each 11352.00

Each 13392.00

Each 2089.00

Each 1442.00
Each 3246.00

Each 734.00

Each 1460.00

Each 2237.00
Each 1981.00

Each 2428.00

Each 1469.00

Each 1789.00

Each 1278.00

Each 1661.00

Each 3491.00
Each 4087.00

Each 4599.00

Each 2250.00
Each 1036.00
Each 6224.00

Each 4907.00

Each 4448.00

Each 652.00

Each 767.00

Each 2300.00

Each 2555.00

Each 449.00

Each 328.00
Each 409.00
Pair 75.00

Each 572.00

Each 285.00
Each 287.00

Each 83.00

Each 409.00

Each 148.00
Each 57.00
Each 163.00

Each 409.00

Each 223.00

Each 543.00

Each 771.00

Each 1088.00

Each 776.00

Each 997.00

Each 2914.00

Each 694.00

Each 568.00

Each 734.00

Each 748.00

Each 997.00

Each 1088.00

Each 13176.00

Each 13176.00
Each 2183.00

Each 2291.00

Each 246.00

Each 216.00

Each 1452.00

Each 2086.00

Each 1270.00

Each 1183.00

Each 1591.00

Each 210.00

Each 224.00

Each 215.00

Each 710.00

Each 551.00

Each 862.00

Each 551.00

Each 2527.00

Each 1947.00

Each 3310.00

Each 3065.00
Each 3975.00
Each 3811.00

Each 2846.00
Each 2902.00

Each 2539.00

Each 169.00
Each 162.00
Each 155.00
Each 522.00

Each 1119.00

Each 1361.00

Each 792.00
Each 1632.00

Each 232.00

Each 191.00
Each 862.00

Each 866.00

Each 129.00
Each 212.00

Each 231.00

Each 274.00

Each 141.00
Each 360.00
Each 971.00
Each 2938.00

Each 560.00
Each 911.00

Each 1880.00

Each 1470.00

Each 3085.00
Each 368.00
Each 286.00
Each 680.00
Each 514.00
Each 409.00
Each 4996.00
Each 7858.00

Each 792.00

Each 58.00

Each 69.00

Each 150.00

Each 156.00

Each 63.00
Each 68.00
Each 375.00
Each 560.00
Each 748.00
Each 317.00
Each 159.00
Each 72.00
Each 380.00

Each 735.00

Each 991.00

Each 1948.00

Each 51.00
Each 99.00
Each 175.00
Each 99.00
1000 29.00

1 RM 166.00

1 RM 190.00

1 RM 250.00

1 RM 347.00

1 RM 392.00

1 RM 428.00
1 RM 184.00

1 RM 204.00

1 RM 268.00

1 RM 375.00

1 RM 420.00

1 RM 452.00

1 RM 802.00

Each 41.00
Each 49.00
Each 74.00
Each 92.00
Each 110.00
Each 136.00
Each 82.00
Each 50.00
Each 74.00
Each 73.00
Each 422.00

Each 346.00

Each 224.00

Each 2.00
Each 4.00
Each 4.00
Each 4.00
Each 12.00
Each 19.00
Each 25.00
Each 30.00
Each 43.00

Each 62.00

Each 73.00

Each 577.00
Each 778.00

Each 1119.00

Each 1700.00

Each 2297.00

Each 3365.00

Each 5196.00

Each 7702.00

Each 426.00

Each 623.00

Each 973.00

Each 1428.00

Each 1981.00

Each 402.00

Each 522.00

Each 790.00

Each 1088.00

Each 1315.00

Each 2086.00

Each 188.00

Each 273.00

Each 384.00

Each 681.00

Each 937.00

Each 1408.00

Each 1223.00

Each 1556.00
Each 168.00

Each 96.00

Each 62.00

Each 252.00
Each 401.00
Each 479.00
Each 285.00
Each 454.00
Each 556.00
Each 177.00
Each 274.00
Each 341.00
Each 190.00
Each 291.00
Each 352.00
Each 131.00
Each 200.00
Each 241.00
Each 110.00
Each 162.00
Each 209.00
Each 67.00
Each 111.00
Each 139.00
Each 1140.00
Each 428.00
Each 689.00
Each 819.00
Each 469.00
Each 742.00
Each 904.00
Each 281.00
Each 436.00
Each 520.00
Each 300.00
Each 454.00
Each 561.00
Each 203.00
Each 315.00
Each 383.00
Each 175.00
Each 257.00
Each 310.00
Each 113.00
Each 176.00
Each 225.00
Each 1864.00
1 Lit 7.00

Each 75.00
Each 47.00
Each 26.00

Each 89.00
Each 210.00
Each 1439.00

Each 1690.00

Each 814.00

Each 50.00
Each 70.00
Each 83.00
Each 67.00
Each 94.00
Each 107.00
Each 39.00
Each 54.00
Each 70.00
Each 67.00
Each 97.00
Each 117.00
Each 59.00
Each 89.00
Each 108.00
Each 72.00
Each 108.00
Each 129.00
Each 124.00
Each 181.00
Each 257.00
Each 198.00
Each 283.00
Each 292.00
Each 73.00
Each 117.00
Each 135.00
Each 94.00
Each 148.00
Each 170.00
Each 101.00
Each 157.00
Each 177.00
Each 131.00
Each 204.00
Each 229.00
Each 35.00
Each 50.00
Each 57.00
Each 59.00
Each 57.00
Each 79.00
Each 10.00
Each 14.00
Each 17.00
Each 19.00
Each 11.00

Each 14.00
Each 14.00
Each 15.00
Each 17.00
Each 18.00
Each 35.00
Each 187.00
Each 206.00
Each 236.00
Each 217.00
Each 225.00
Each 327.00
Each 111.00
Each 87.00

Each 108.00
Each 53.00
Each 101.00
Each 143.00
Each 111.00
Each 24.00
Each 39.00
Each 150.00
Each 116.00
Each 137.00
Each 145.00
Each 57.00
Each 64.00
Each 73.00
Each 53.00
Each 61.00
Each 64.00
Each 9.00
Each 10.00
Each 11.00
Each 10.00
Each 11.00
Each 14.00
Each 69.00
Each 90.00
Each 222.00

Each 30.00
Each 65.00
Each 117.00
Each 217.00
Each 295.00
Each 15.00
Each 25.00
Each 59.00
Each 115.00
Each 225.00

1 RM 76.00

1 RM 34.00

1 RM 57.00

Each 56.00

Each 11.00

Each 30.00

1 Rm 142.00
1 Rm 30.00
Each 96.00
Each 852.00
Each 93.00
Each 243.00
Each 219.00
Mr. 67.00
Mr. 75.00
Mr. 111.00
Rm 141.00
Rm 164.00
Each 46.00
Each 46.00
Each 46.00
Each 46.00
Each 107.00
Each 72.00
Each 47.00
Each 72.00
Each 38.00
Each 149.00

Each 129.00

Each 190.00

Each 63.00
Each 65.00
Each 44.00
Each 24.00
Each 101.00

1 RM 38.00
Each 23.00
Each 466.00
Each 10.00
Each 14.00
Each 71.00
Each 110.00
Each 198.00

1 RM 142.00

1 RM 177.00

1 RM 222.00

1 RM 298.00

1 RM 391.00

1 RM 497.00
1 RM 206.00

1 RM 247.00

1 RM 305.00

1 RM 402.00

1 RM 521.00

1 RM 659.00
1 RM 169.00

1 RM 200.00

1 RM 243.00

1 RM 314.00

1 RM 401.00

1 RM 128.00
1 RM 146.00
1 RM 193.00
1 RM 263.00
1 RM 327.00
1 RM 477.00
1 RM 141.00
1 RM 172.00
1 RM 206.00
1 RM 281.00
1 RM 348.00
1 RM 508.00
1 RM 44.00

1 RM 66.00

1 RM 105.00

1 RM 163.00

1 RM 292.00

1 RM 458.00

1 RM 637.00

1 RM 873.00

1 RM 1294.00

1 RM 60.00

1 RM 93.00

1 RM 148.00

1 RM 228.00

1 RM 408.00

1 RM 641.00

1 RM 907.00

1 RM 1293.00

1 RM 1935.00

1 RM 70.00

1 RM 107.00

1 RM 173.00

1 RM 266.00

1 RM 471.00

1 RM 743.00

1 RM 1054.00

1 RM 1432.00

1 RM 2255.00

1 RM 10.00
1 RM 14.00
1 RM 19.00
1 RM 33.00
1 RM 64.00
1 RM 122.00
1 RM 185.00
1 RM 355.00
1 RM 631.00
Each 38.00
Each 61.00
Each 79.00
Each 126.00
Each 147.00
Each 373.00
Each 482.00
Each 17.00
Each 20.00
Each 39.00
Each 68.00
Each 128.00
Each 249.00
Each 402.00
Each 748.00
Each 1388.00
Each 15.00
Each 26.00
Each 46.00
Each 82.00
Each 146.00
Each 295.00
Each 577.00
Each 837.00
Each 1449.00
Each 7.00
Each 10.00
Each 19.00
Each 33.00
Each 58.00
Each 122.00
Each 204.00
Each 325.00
Each 643.00
Each 12.00

Each 20.00

Each 19.00

Each 34.00
Each 33.00

Each 32.00

Each 50.00

Each 51.00

Each 52.00

Each 52.00

Each 113.00

Each 113.00

Each 114.00

Each 114.00

Each 115.00

Each 168.00

Each 169.00

Each 213.00

Each 408.00

Each 432.00

Each 544.00

Each 633.00

Each 683.00

Each 32.00

Each 56.00

Each 57.00

Each 92.00
Each 93.00

Each 96.00

Each 133.00

Each 134.00

Each 138.00

Each 139.00
Each 384.00

Each 386.00

Each 391.00

Each 397.00

Each 403.00

Each 542.00

Each 551.00

Each 730.00

Each 776.00

Each 1323.00

Each 1376.00

Each 102.00

Each 105.00

Each 183.00

Each 186.00

Each 193.00

Each 297.00

Each 439.00

Each 613.00

Each 816.00

Each 1572.00

Each 158.00

Each 163.00

Each 238.00

Each 249.00

Each 462.00
Each 541.00

Each 756.00

Each 1163.00

Each 1861.00

Each 109.00

Each 114.00

Each 176.00

Each 169.00

Each 197.00

Each 328.00

Each 163.00

Each 179.00

Each 237.00

Each 228.00

Each 491.00

Each 106.00

Each 115.00

Each 193.00

Each 203.00

Each 228.00

Each 320.00

Each 164.00

Each 176.00

Each 252.00
Each 257.00

Each 272.00

Each 501.00

Each 423.00

Each 633.00

Each 845.00

Each 1184.00

Each 1904.00

Each 3024.00

Each 485.00

Each 645.00

Each 845.00

Each 1057.00

Each 2009.00

Each 3384.00

Each 93.00
Each 108.00
Each 178.00
Each 169.00
Each 223.00
Each 233.00
Each 478.00
Each 556.00
Each 900.00
Each 1481.00
Each 2115.00
Each 10.00
Each 13.00
Each 15.00
Each 17.00

quality & ISI and as approved by the Engineer In charge of the work.

in this section are landing costs, including material


dgon& stacking at site.
market rates plus Sales Tax/ Material VAT.
sition Scheme on finished items may be allowed as
d on the Common SoR
be allowed on basic cost of white porcelain items
e purely for the guidance of the officers in preparation
ode. Authority who prepares the estimate is however
ara 45 of APPWD code.
KODADA
Page MUNICIPALITY
1603 of 2191

DATA BASED ON - 2016 - 2017 SSR


43344
KODADA MUNICIPALITY
DATA - ALL PIPE LINE WORKS RELATED TO WATER SUPPLY AND SEWERS
Data Based on 2018-19 SSR
43344
I DATA - WATER SUPPLY
Sn. Description Quantity Rate Unit Amount
1 Cutting open BT road surface (as well as asphalt concrete upto 75 mm thick ) including water bound macadam and
stacking of excavated materials for pipe line trench work. as directed by the departmental officers.

Rate as per PH SSR item no 25a, Pg.6 1 Sqm #REF! 10 Sqm #REF!
Add for Municipal Allowance at 20% #REF!
Overheads & Contractors Profit 13.615% #REF!
Total #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Sqm Rs #REF!

2 Cutting open C.C. road surface including stacking of excavated materials for pipe line trench work. as directed by the
departmental officers.
Rate as per PH SSR item no 25b,Pg.6 1 Cum #REF! 1 Cum #REF!
Add for Municipal Allowance at 20% #REF!
Overheads & Contractors Profit 13.615% #REF!
Total #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Cum Rs #REF!

3 Cutting open water bound macadam road including soiling and stacking of excavated materials for pipe line trench
work. as directed by the departmental officers.
Rate as per PH SSR item no 25 c,Pg.6 1 Cum #REF! 1 Cum #REF!
Add for Municipal Allowance at 20% #REF!
Overheads & Contractors Profit 13.615% #REF!
Total #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Cum Rs #REF!

1 RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation
in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out,
construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom
as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including
protecting the existing utility services wherever it is possible during the execution and taking all precautionary
measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in
trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all
incidental and operational charges etc., complete for Pipe Line trenches by manual means.

Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD and 301.2.1 of MORT&H
In ordinary soils, by Manual means for Pipe line Trenches
i up to 3.00 Mts depth below GL out put 10.00 Cum
a)  Labour
Mate ( Labour- R&B-S.N.71) 0 Nos. 540.00 1 Each 0.00
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 3.64 Nos. 510.00 1 Each 1856.40
1856.40
c&d) Overheads & Contractors Profit @ 13.615% 252.75
add extra for pipe line trenches @ 75% 1392.30
Cost for 240 cum = a+b+c+d 3501.45
Rate per cum = (a+b+c+d)/10 350.15
VAT & Labour cess. 0% 0.00
a Rate per 1 Cum excluding Dewatering Rs 350.15
447524687.xlsx - data-Road
Add extra for Dewatering @ 5% 5%
Page 1604 of 2191 17.51
b Rate per 1 Cum including Dewatering Rs 367.66

2 RBR-FNDN-1- (I-B-i) - In ordinary soils up to 3.00 Mts depth below GL by Mechanical means: Earthwork
excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting
out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and
bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting
the existing utility services wherever it is possible during the execution and taking all precautionary measures in the
restricted areas for laying sewer/water lines including divertion of traffic and backfilling in trenches with excavated
suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational
charges etc., complete for Pipe Lines by mechanical means.

In ordinary soils by Mechanical means for Pipe line trenches


up to 3.00 Mts depth below GL out put 240.0 Cum
a)  Labour
Mate ( Labour- R&B-S.N.71) 0 Nos. 540.00 1 Each 0.00
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 8.32 Nos. 510.00 1 Each 4243.20
b) Machinery
Hydraulic Excavator - (Hire charges R & B- S.N.4) 6.00 hours 2967.90 1 hours 17807.40
Sub total 22050.60
c&d) Overheads & Contractors Profit 13.615% 3002.19
Cost for 240 cum = a+b+c+d 25052.79
Rate per cum = (a+b+c+d)/240 104.39
VAT & Labour cess. 0% 0.00
a Rate per 1 Cum excluding Dewatering Rs 104.39
Add extra for Dewatering @ 5% 5% 5.22
b Rate per 1 Cum including Dewatering Rs 109.61

3 RBR-FNDN-1- (II-B) - Ordinary rock (not requiring blasting) -up to 3.00Mts. below GL by Machanical means:
Excavation in Ordinary Rock for Pipe line trenches as per drawings and technical specifications including setting out,
construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom
as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including
protecting the existing utility services wherever it is possible during the execution and taking all precautionary
measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and disposal of rock
upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by
machanical means.

Ordinary rock (not requiring blasting)-Mechanical Means-Upto 3 m depth


up to 3.00 Mts depth below GL out put 180.0 Cum
a)  Labour
Mate ( Labour- R&B-S.N.71) 0 Nos. 540.00 1 Each 0.00
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 6.24 Nos. 510.00 1 Each 3182.40
b) Machinery
Hydraulic Excavator - (Hire charges R & B- S.N.4) 6.00 hours 2967.90 1 hours 17807.40
Sub total 20989.80
c&d) Overheads & Contractors Profit 13.615% 2857.76
Cost for 240 cum = a+b+c+d 23847.56
Rate per cum = (a+b+c+d)/240 132.49
VAT & Labour cess. 0% 0.00
Rate per 1 Cum excluding Dewatering Rs 132.49

4 RBR-FNDN-1- (IV) - Hard rock (blasting prohibited) -up to 3.00Mts. below GL: Excavation in Hard Rock in
habitant areas where conventional blasting can not be done for Pipe line trenches as per drawings and technical
specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious
material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by
the departmental officer including protecting the existing utility services wherever it is possible during the execution
and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of
traffic and disposal of rock upto a lead of 50 m, including all incidental and operational charges etc., complete

out put 10.00 Cum


a)  Labour
Mate ( Labour- R&B-S.N.71) 0.00 Nos 540.00 1 Nos 0.00
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 5.20 Nos 510.00 1 Nos 2652.00
447524687.xlsx - data-Road
b) Machinery Page 1605 of 2191
Air compressor 210 cfm / 250 cfm with 2 jack 6.00 hour 1358.70 1 hour 8152.20
hammers ( Hire charges- Irrigation-S.N.3)
sub total ; a+b 10804.20
c&d) Overheads & Contractors Profit 13.615% 1470.99
Cost for 10 cum = a+b+c+d 12275.19
Rate per cum = a+b+c+d+e)/10 1227.52
VAT & Labour cess. 0% 0.00
Rate per 1 Cum excluding Dewatering 1227.52

5 RBR-FNDN-1-A-i -manual means : Earthwork excavation for structures in all types of soils up to 3.00 Mts
depth below GL by manual means as per drawing and technical specifications including setting out, construction
of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing
of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305
MORD / 304 MORTH. for Sumps,Thrust blocks, Chambers and Man Holes etc. by manual means,

Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD and 301.2.1 of MORT&H
Ordinary Soils : for Sumps, Thrust Blocks and Man Holes etc,.
up to 3.00 Mts depth below GL out put 10.00 Cum
a)  Labour
Mate ( Labour- R&B-S.N.71) 0 Nos. 540.00 1 Each 0.00
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 3.64 Nos. 510.00 1 Each 1856.40
Sub total 1856.40
c&d) Overheads & Contractors Profit 13.615% 252.75
Cost for 240 cum = a+b+c+d 2109.15
Rate per cum = (a+b+c+d)/10 210.92
VAT & Labour cess. 0% 0.00
a Rate per 1 Cum excluding Dewatering Rs 210.92
Add extra for Dewatering @ 5% 5% 10.55
b Rate per 1 Cum including Dewatering Rs 221.47

6 PHE-SHST-25: Providing shoring and shrutting for excavation of trenches for laying pipe lines including cost and
conveyance of all materials, labour charges and removal of shoring and shuttering at appropriate places as directed
by the departmental officers with all incidental and ooperational charges etc, complete.
a Single staging from 0’ to 8’-0” ( 0 to 2.5 Metre)
Depth not exceeding 1.5 M
Details of cost for an area 30 M long and 1.5 M
deep.
Area = 30 x 1.5 = 45 sqm
(a) Labour
Carpenter 2nd class ( Labour-Irrigation-Semi skilled- 0.570 day 540.00 1 day 307.80
S.N.17)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 1.100 day 510.00 1 day 561.00
b) Material
Polling boards and ballies sqm
Requirement for 45 sqm :
Polling Boards of 250 mm x 35 mm (40 x 1.5 x 0.25 0.110 cum #REF! 1 cum #REF!
x 0.038) -(Pg.310 of Irri.SSR-Sn.-47-Pg.13 Jungle
wood planks)
Ballies 125 mm dia 1.5 mts long (60 x p x (0.125)2 / 0.160 cum 3825.00 1 cum 612.00
4 x 1.5
BMC-X.05- Pg.No.104 of Bld.SSR-Casuarina Balli
Props - 3" to 4" dia - 12'-0" Height( Approx 9 Nos of
Ballies equals to 0.16Cum, cost of each balli =Rs.
68 (9x68 =612 )or 3825 for 1 Cum
Deduct–Credit for materials after use @ 80% of the #REF!
cost of materials =0.8 x X
c) Machinery
Total #REF!
Overheads & Contractors Profit 13.615% #REF!

447524687.xlsx - data-Road
(d) Cost for 45 sqm (a+b+c) Page 1606 of 2191 #REF!
Rate per each sqm = d/45 #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Sqm #REF!
b Double staging from 8’ to 14 ( 2.5 to 4.5 Metre)
Depth not exceeding 1.5 M
Details of cost for an area 30 M long and 1.5 M
deep.
Area = 30 x 1.5 = 45 Sqm
(a) Labour
Carpenter 2nd class ( Labour-Irrigation-Semi 0.500 day 540.00 1 day 270.00
skilled-S.N.17)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 1.320 day 510.00 1 day 673.20
b) Material
Polling boards and ballies sqm
Requirement for 45 sqm :
Polling Boards of 250 mm x 35 mm (40 x 1.5 x 0.25 0.110 cum #REF! 1 cum #REF!
x 0.038 = 0.57 cum)
Ballies 125 mm dia 1.5 mts long (60 x p x (0.125)2 / 0.220 cum 3825.00 1 cum 841.50
4 x 1.5 = 1.1Pg.No.104
BMC-X.05- cum of Bld.SSR-Casuarina Balli
Props - 3" to 4" dia - 12'-0" Height( Approx 9 Nos of
Ballies equals to 0.16Cum, cost of each balli =Rs.
68 (9x68 =612 )or 3825 for 1 Cum
Deduct–Credit for materials after use @ 80% of the #REF!
cost of materials =0.8 x X
c) Machinery
Total #REF!
Overheads & Contractors Profit 13.615% #REF!
(d) Cost for 45 sqm (a+b+c) #REF!
Rate per each sqm = d/45 #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Sqm #REF!
c Triple staging beyond 14’ for every 2 meter (beyond 4.5 M) Add for every 2 Mts (difference of single and double
staging) for staging beyond 4.5 mts.
Rate for 6.50m #REF!
Rate for 8.50m #REF!
Rate for 10.50m #REF!

7 PHE-BHLW-26 : Barricading, hoarding, lighting and watching etc., for water supply and sewerage works for trenches
of depths upto 6’-0” (2 Meter) below G.L
Taking output 3 Rmt
Material
Bamboos of 1 ½ ”dia 2.5 M long (5 ft c/c = 3 x 2.5) - 7.50 rmt #REF! 2.44 rmt #REF!
BMC-X.12 -Sl.No.1024, Pg.104 of Bld.SSR
Bamboos of 1 ½ ”dia 3.66 M long (5 ft c/c = 3x 10.98 rmt #REF! 2.44 rmt #REF!
3.66) - BMC-X.12 -Sl.No.1024, Pg.104 of Bld.SSR

Cost of Bamboos #REF!


(a) Usage of Material 5 times. Thus Cost of Material #REF!
taken as 20%
(b) Labour
Man mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 0.500 day 510.00 1 day 255.00
(c) Sundries for Coir rope, nails, @ 1% #REF!
(d) Sundries for lighting and watching etc at 1% #REF!
#REF!
Overheads & Contractors Profit 13.615% #REF!
Cost for 3rmt (a+b+c+d) #REF!
Rate per each rmt = (a+b+c+d)/3 #REF!
VAT & Labour cess. 0% #REF!

447524687.xlsx - data-Road
Rate per 1 Rmt Page 1607 of 2191 #REF!

8 BLD-CSTN-2-8 (16) : Collection ,Supply and filling of Sand from approved quarry to work site and stacking at work
site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour charges etc.
complete as per standard specifications. Clause 305.3.9 MORD & 304 MORTH
Sand Filling out put 6.00 Cum
a) Material
Sand (C-Mat-Lead statement-S.No.1) 6.00 Cum 1303.00 1 Cum 7818.00
b)  Labour
Mate ( Labour- R&B-S.N.71) 0.00 Nos 540.00 1 Nos 0.00
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 0.31 Nos 510.00 1 Nos 158.10
Sub Total 7976.10
b&c) Overheads & Contractors Profit 13.615% 1085.95
Cost for 6 cum = a+b+c 9062.05
Rate per cum = (a+b+c)/6 1510.34
VAT & Labour cess. 0% 0.00
Rate per 1 Cum 1510.34

9 BLD-CSTN-2-8 (16): Collection ,Supply and filling of Stone dust from approved quarry to work site and stacking at
work site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour
charges etc. complete as per standard specifications. Clause 305.3.9 MORD & 304 MORTH
Stone dust Filling out put 6.00 Cum
a) Material
Stone dust Filling (C-Mat-Lead statement-S.No.23) 6.00 Cum 618.70 1 Cum 3712.20
b)  Labour
Mate ( Labour- R&B-S.N.71) 0.00 Nos 540.00 1 Nos 0.00
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 0.31 Nos 510.00 1 Nos 158.10
Sub Total 3870.30
b&c) Overheads & Contractors Profit 13.615% 526.94
Cost for 6 cum = a+b+c 4397.24
Rate per cum = (a+b+c)/6 732.87
VAT & Labour cess. 0% 0.00
Rate per 1 Cum 732.87

10 BLD-CSTN-2-8 (16) : Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not
exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance
of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished
item of work. (APSS NO. 309 & 310)
out put 6.00 Cum
Cost of Gravel ( C-Mat - Sn.5) 6.00 Cum 127.26 1 Cum 763.56
a)  Labour
Mate ( Labour- R&B-S.N.71) 0.00 Nos 540.00 1 Nos 0.00
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 0.31 Nos 510.00 1 Nos 158.10
921.66
b&c) Overheads & Contractors Profit 13.615% 125.48
Cost for 6 cum = a+b+c 1047.14
Rate per cum = (a+b+c)/6 174.52
VAT & labour cess 0% 0.00
Rate per 1 Cum 174.52

11 BLD-CSTN-2-9 (17); Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations
and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering
and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire
charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

out put 6.00 Cum


447524687.xlsx - data-Road
a)  Labour Page 1608 of 2191
Mate ( Labour- R&B-S.N.71) 0.00 Nos 540.00 1 Nos 0.00
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 0.31 Nos 510.00 1 Nos 158.10
b&c) Overheads & Contractors Profit 13.615% 21.53
Cost for 6 cum = a+b+c 179.63
Rate per cum = (a+b+c)/6 29.94
VAT & labour cess 0% 0.00
Rate per 1 Cum 29.94

2 Carting of surplus excavated rock from the site to a distance suitable including loading, unloading charges, cost &
conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete.

a Rock/CC
Page No.328 of SSR, Conveyance rates - 5.00 Km 1 cum 57.10 1 Cum 57.10
VAT & Labour cess. 0% 0.00
Rate per 1 Cum Rs 57.10

b Earth
Page No.124 of SSR, Conveyance rates - 5.00 Km 1 cum 57.10 1 Cum 57.10
VAT & Labour cess. 0% 0.00
Rate per 1 Cum Rs 57.10

3 Bailing out water from the pipe line trenches with oil engine driven pump sets, including hire charges, fuel charges
and wages for Driver and Helper etc, complete,
Basic rate (item No.26/(a)/Pg 6 of PH SSR (PH 1 Hp.hr #REF! 1 Hp.hr #REF!
items)
Total Rs #REF!
Overheads & Contractors Profit 13.615% #REF!
#REF!
VAT & Labour cess. 0% #REF!
Rate per 1HPhr Rs #REF!

4 RBR-STCL-7 : Dismantling Stone Masonry as per Technical Specification Clause 202 : Dismantling of existing
structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal
of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical
Specification Clause 202 MORD / MORTH - Rubble Stone Masonry in Cement Mortar
Rubble Stone Masonry in Cement Mortar Unit 1.25 Cum
a) labour
Mate 0.000 day 540.00 1 day 0.00
Mazdoor (Unskilled) 0.780 day 510.00 1 day 397.80
b) Machinery
Tractor with trolley 3t 0.270 hour 464.80 1 hour 125.50
Total Rs 523.30
C.Overheads & Contractors Profit 14% 71.25
Total for 1.25 Cum 594.55
Total for 1 Cum 475.64
VAT & Labour cess. 0% 0.00
Rate per 1 Cum Rs 475.64

5 RBR-STCL-5 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising
of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the
dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of
1000 m as per Technical Specification Clause 202 MORD / MORTH
A Lime Concrete & CC upto M10 (Manual means) Unit 1.25 Cum
a) labour
Mate 0.000 day 540.00 1 day 0.00
Mazdoor (unskilled) 1.040 day 510.00 1 Cum 530.40
b) Machinery

447524687.xlsx - data-Road
Tractor with trolley 3t Page 1609 of0.270
2191 hour 464.80 1 hour 125.50
Total 655.90
C.Overheads & Contractors Profit 14% 89.3
Total for 1.25 Cum 745.20
Total for 1 Cum 596.16
VAT & Labour cess. 0% 0.00
Rate per 1 Cum Rs 596.16

B Cement Concrete M15 & M20 (Manual means) Unit 1.25 Cum
a) labour
Mate 0.000 day 540.00 1 day 0.00
Mazdoor (unskilled) 1.300 day 510.00 1 Cum 663.00
b) Machinery
Tractor with trolley 3t 0.270 hour 464.80 1 hour 125.50
Total 788.50
C.Overheads & Contractors Profit 14% 107.35
Total for 1.25 Cum 895.85
Total for 1 Cum 716.68
VAT & Labour cess. 0% 0.00
Rate per 1 Cum Rs 716.68

C Reinforced Cement Concrete and prestressed Unit 1.25 Cum


Concrete
a) labour (Manual means)
Mate 0.000 day 540.00 1 day 0.00
Black smith 0.400 day 384.00 1 day 153.60
Mazdoor (unskilled) 3.500 day 510.00 1 Cum 1785.00
b) Machinery
Tractor with trolley 3t 0.270 hour 464.80 1 hour 125.50
Cost per cu m 2064.10
C.Overheads & Contractors Profit 14% 281.03
Total for 1.25 Cum 2345.13
Total for 1 Cum 1876.10
VAT & Labour cess. 0% 0.00
Rate per 1 Cum Rs 1876.10

6 PHE-URCI-19 : Uprooting of C.I. pipes by melting lead, loosening the joints, separating the pipes, hoisting and
keeping within a lead of 10 metres but excluding earth work excavation and refilling
Details of cost for 40.26 m
a 80mm dia metre
(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9) 0.500 day 540.00 1 day 270.00
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 4.000 day 510.00 1 day 2040.00
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood (local market rate) 0.373 Qtl 750.00 1 Qtl 279.75
Kerosene oil (local market rate) 0.379 litre 25.00 1 litre 9.48
(c) Total = a+b 2599.23
(d) Overheads & Contractors Profit 14% 353.89
(e) Cost for 40.26 m (c+d) 2953.12
Rate per each m = e/40.26 73.35
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt Rs 73.35

b 100mm dia metre


(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9) 0.630 day 540.00 1 day 340.20
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 4.500 day 510.00 1 day 2295.00
b) Material
447524687.xlsx - data-Road
For breacking lead coulked joints, melting lead etc.,
Page 1610 of 2191
Fuel wood (local market rate) 0.466 Qtl 750.00 1 Qtl 349.50
Kerosene oil (local market rate) 0.379 litre 25.00 1 litre 9.48
(c) Total = a+b 2994.18
(d) Overheads & Contractors Profit 14% 407.66
(e) Cost for 40.26 m (c+d) 3401.84
Rate per each m = e/40.26 84.50
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt Rs 84.50

c 150mm dia metre


(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9) 0.830 day 540.00 1 day 448.20
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 5.500 day 510.00 1 day 2805.00
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood (local market rate) 0.663 Qtl 750.00 1 Qtl 497.25
Kerosene oil (local market rate) 0.568 litre 25.00 1 litre 14.20
(c) Total = a+b 3764.65
(d) Overheads & Contractors Profit 14% 512.56
(e) Cost for 40.26 m (c+d) 4277.21
Rate per each m = e/40.26 106.24
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt Rs 106.24

d 200mm dia
(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9) 1.100 day 540.00 1 day 594.00
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 6.500 day 510.00 1 day 3315.00
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood (local market rate) 0.840 Qtl 750.00 1 Qtl 630.00
Kerosene oil (local market rate) 0.757 litre 25.00 1 litre 18.93
(c) Total = a+b 4557.93
(d) Overheads & Contractors Profit 14% 620.56
(e) Cost for 40.26 m (c+d) 5178.49
Rate per each m = e/40.26 128.63
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt Rs 128.63

e 250mm dia
(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9) 1.300 day 540.00 1 day 702.00
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 7.500 day 510.00 1 day 3825.00
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood 1.026 Qtl 750.00 1 Qtl 769.50
Kerosene oil 1.137 litre 25.00 1 litre 28.41
(c) Total = a+b 5324.91
(d) Overheads & Contractors Profit 14% 724.99
(e) Cost for 40.26 m (c+d) 6049.90
Rate per each m = e/40.26 150.27
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt Rs 150.27

f 300mm dia

447524687.xlsx - data-Road
(a) Labour Page 1611 of 2191
Assistant fitter (labour-Irri-Semi skilled.S.N.9) 1.500 day 540.00 1 day 810.00
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 8.500 day 510.00 1 day 4335.00
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood 1.120 Qtl 750.00 1 Qtl 840.00
Kerosene oil 1.515 litre 25.00 1 litre 37.88
(c) Total = a+b 6022.88
(d) Overheads & Contractors Profit 14% 820.02
(e) Cost for 40.26 m (c+d) 6842.90
Rate per each m = e/40.26 169.97
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt Rs 169.97

g 350mm dia
(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9) 1.750 day 540.00 1 day 945.00
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 9.500 day 510.00 1 day 4845.00
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood 1.231 Qtl 750.00 1 Qtl 923.25
Kerosene oil 1.515 litre 25.00 1 litre 37.88
(c) Total = a+b 6751.13
(d) Overheads & Contractors Profit 14% 919.17
(e) Cost for 40.26 m (c+d) 7670.30
Rate per each m = e/40.26 190.52
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt Rs 190.52

h 400mm dia
(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9) 2.000 day 540.00 1 day 1080.00
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 10.500 day 510.00 1 day 5355.00
b) Material
For breacking lead coulked joints, melting lead
etc.,
Fuel wood 1.306 Qtl 750.00 1 Qtl 979.50
Kerosene oil 1.894 litre 25.00 1 litre 47.35
(c) Total = a+b 7461.85
(d) Overheads & Contractors Profit 14% 1015.93
(e) Cost for 40.26 m (c+d) 8477.78
Rate per each m = e/40.26 210.58
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt Rs 210.58

i 450mm dia
(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9) 2.250 day 540.00 1 day 1215.00
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 11.500 day 510.00 1 day 5865.00
b) Material
For breacking lead coulked joints, melting lead
etc.,
Fuel wood 1.400 Qtl 750.00 1 Qtl 1050.00
Kerosene oil 2.273 litre 25.00 1 litre 56.83
(c) Total = a+b 8186.83
(d) Overheads & Contractors Profit 14% 1114.64
(e) Cost for 40.26 m (c+d) 9301.47
447524687.xlsx - data-Road
Rate per each m = e/40.26 Page 1612 of 2191 231.04
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt Rs 231.04

j 500mm dia
(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9) 2.500 day 540.00 1 day 1350.00
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 12.500 day 510.00 1 day 6375.00
b) Material
For breacking lead coulked joints, melting lead
etc.,
Fuel wood 1.492 Qtl 750.00 1 Qtl 1119.00
Kerosene oil 2.652 litre 25.00 1 litre 66.30
(c) Total = a+b 8910.30
(d) Overheads & Contractors Profit 14% 1213.14
(e) Cost for 40.26 m (c+d) 10123.44
Rate per each m = e/40.26 251.45
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt Rs 251.45

k 600mm dia
(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9) 3.000 day 540.00 1 day 1620.00
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 14.500 day 510.00 1 day 7395.00
b) Material
For breacking lead coulked joints, melting lead
etc.,
Fuel wood 1.580 Qtl 750.00 1 Qtl 1185.00
Kerosene oil 3.410 litre 25.00 1 litre 85.25
(c) Total = a+b 10285.25
(d) Overheads & Contractors Profit 14% 1400.34
(e) Cost for 40.26 m (c+d) 11685.59
Rate per each m = e/40.26 290.25
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt Rs 290.25

7 PHE-URRC-20: Uprooting of R.C.C. Pipes including breaking the collars, loosing the joint, scraping the pipe, hoisting
and keeping within a lead of 10 M but excluding earthwork excavation and refilling
Taking output 10.00 Rmt
a 100mm dia
(a) Labour
Fitter 2nd class (labour-Irri-Semi skilled.S.N.9) 0.100 day 540.00 1 day 54.00
Man mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 0.400 day 510.00 1 day 204.00
Women mazdoor ( Labour-Irrigation-Unskilled- 0.450 day 510.00 1 day 229.50
S.N.4) 487.50
(b) Overheads & Contractors Profit 14% 66.37
(c) Cost for 10 Rmt (a+b) 553.87
Rate per each Rmt = c/10 55.39
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt Rs 55.39

b 150mm dia
(a) Labour
Fitter 2nd class (labour-Irri-Semi skilled.S.N.9) 0.100 day 540.00 1 day 54.00
Man mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 0.490 day 510.00 1 day 249.90
Women mazdoor ( Labour-Irrigation-Unskilled- 0.560 day 510.00 1 day 285.60
S.N.4) 589.50
(b) Overheads & Contractors Profit 14% 80.26

447524687.xlsx - data-Road
(c) Cost for 10 Rmt (a+b) Page 1613 of 2191 669.76
Rate per each Rmt = c/10 66.98
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt Rs 66.98

c 225mm dia
(a) Labour
Fitter 2nd class (labour-Irri-Semi skilled.S.N.9) 0.100 day 540.00 1 day 54.00
Man mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 0.490 day 510.00 1 day 249.90
Women mazdoor ( Labour-Irrigation-Unskilled- 0.670 day 510.00 1 day 341.70
S.N.4) 645.60
(b) Overheads & Contractors Profit 14% 87.9
(c) Cost for 10 Rmt (a+b) 733.50
Rate per each Rmt = c/10 73.35
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt Rs 73.35

d 300mm dia
(a) Labour
Fitter 2nd class (labour-Irri-Semi skilled.S.N.9) 0.100 day 540.00 1 day 54.00
Man mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 0.490 day 510.00 1 day 249.90
Women mazdoor ( Labour-Irrigation-Unskilled- 0.790 day 510.00 1 day 402.90
S.N.4) 706.80
(b) Overheads & Contractors Profit 14% 96.23
(c) Cost for 10 Rmt (a+b) 803.03
Rate per each Rmt = c/10 80.30
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt Rs 80.30

8 PHE-URSW-21: Uprooting of old S.W. pipes including breaking of joints and bed concrete stacking of useful
materials near the site with in 50m lead and disposal of un serviceable materials in to municipal dumps excluding the
cost of earth work excavation. (Reference to specifications BIS No.)
Details of cost for 10 m
a 100mm dia metre
(a) Labour
Man mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 0.490 day 510.00 1 day 249.90
Women mazdoor ( Labour-Irrigation-Unskilled- 0.360 day 510.00 1 day 183.60
S.N.4) 433.50
(b) Overheads & Contractors Profit 14% 59.02
(c) Cost for 10 m (a+b) 492.52
Rate per each m =c/10 49.25
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt 49.25

b 150mm dia metre


(a) Labour
Man mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 0.490 day 510.00 1 day 249.90
Women mazdoor ( Labour-Irrigation-Unskilled- 0.450 day 510.00 1 day 229.50
S.N.4) 479.40
(b) Overheads & Contractors Profit 14% 65.27
(c) Cost for 10 m (a+b) 544.67
Rate per each m =c/10 54.47
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt 54.47

447524687.xlsx - data-Road
c 200mm dia metre Page 1614 of 2191
(a) Labour
Man mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 0.490 day 510.00 1 day 249.90
Women mazdoor ( Labour-Irrigation-Unskilled- 0.510 day 510.00 1 day 260.10
S.N.4) 510.00
(b) Overheads & Contractors Profit 14% 69.44
(c) Cost for 10 m (a+b) 579.44
Rate per each m =c/10 57.94
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt 57.94

d 250mm dia metre


(a) Labour
Man mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 0.490 day 510.00 1 day 249.90
Women mazdoor ( Labour-Irrigation-Unskilled- 0.570 day 510.00 1 day 290.70
S.N.4) 540.60
(b) Overheads & Contractors Profit 14% 73.6
(c) Cost for 10 m (a+b) 614.20
Rate per each m =c/10 61.42
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt 61.42

e 300mm dia metre


(a) Labour
Man mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 0.490 day 510.00 1 day 249.90
Women mazdoor ( Labour-Irrigation-Unskilled- 0.630 day 510.00 1 day 321.30
S.N.4) 571.20
(b) Overheads & Contractors Profit 14% 77.77
(c) Cost for 10 m (a+b) 648.97
Rate per each m =c/10 64.90
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt 64.90

9 Providing temparary water supply house service connections with ISI mark GI pipes and fittings so as not to disturb
the existing water supply connections during earth work excavation for trenches and during laying of new mains in
including cost and conveyance of all materials, labour charges and with all incidental and operational charges etc.,
complete.
a 15mm Nominal bore GI pipe water supply line
S & F 15 mm Nominal Bore GI pipe Medium Grade 1 Rmt #REF! 1 Rmt #REF!
properties & weight as per IS 1239 ISI mark with GI
fittings (BMW-F.67,Sn.278) -2014-15 SSR
Add Municipal Allowence labour charges( as per 20% #REF! #REF!
-BMW-F.68 - Sn.269) -2014-15 SSR
Supply of 19/20mm PVC Flexible Pipe. as per 1 Rmt #REF! 1 Rmt #REF!
2014-15- SSR item ELEC-1.2.23, Sn.74
#REF!
c&d) Overheads & Contractors Profit 14% #REF!
Total #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!

b 20mm Nominal bore GI pipe water supply line


S & F 20 mm Nominal Bore GI pipe Medium Grade 1 Rmt #REF! 1 Rmt #REF!
properties & weight as per IS 1239 ISI mark with GI
fittings (BMW-F.69,Sn.280) -2014-15 SSR
Add Municipal Allowence labour charges( as per 20% #REF! #REF!
-BMW-F.70 - Sn.281) -2014-15 SSR
447524687.xlsx - data-Road
Supply of 19/20mm PVC Flexible Pipe. as per
Page 1615 of 21911 Rmt #REF! 1 Rmt #REF!
2014-15 SSR item ELEC-1.2.23, Sn.74
#REF!
c&d) Overheads & Contractors Profit 14% #REF!
Total #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!

c 25mm Nominal bore GI pipe water supply line


S & F 25 mm Nominal Bore GI pipe Medium Grade 1 Rmt #REF! 1 Rmt #REF!
properties & weight as per IS 1239 ISI mark with GI
fittings (BMW-F.71,Sn.282) -2014-15 SSR
Add Municipal Allowence labour charges( as per 20% #REF! #REF!
-BMW-F.72 - Sn.283) -2014-15 SSR
Supply of 19/20mm PVC Flexible Pipe. as per 1 Rmt #REF! 1 Rmt #REF!
2014-15 SSR item ELEC-1.2.23, Sn.74
#REF!
c&d) Overheads & Contractors Profit 14% #REF!
Total #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!

d a) S& F 32 mm Nominal Bore GI pipe Light Grade properties & weight as per IS 1239 ISI mark with GI fittings
including the cost of pipe & its fittings & labour charges complete
32mm Nominal bore GI pipe water supply line
S & F 32 mm Nominal Bore GI pipe Medium Grade 1 Rmt #REF! 1 Rmt #REF!
properties & weight as per IS 1239 ISI mark with GI
fittings (BMW-F.73,Sn.284) 2014-15 SSR
Add Municipal Allowence labour charges( as per 20% #REF! #REF!
-BMW-F.74 - Sn.284) -2014-15 SSR
Supply of 19/20mm PVC Flexible Pipe. as per 1 Rmt #REF! 1 Rmt #REF!
2014-15- SSR item ELEC-1.2.23, Sn.74
#REF!
c&d) Overheads & Contractors Profit 14% #REF!
Total #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!

e a) S& F 40 mm Nominal Bore GI pipe Light Grade properties & weight as per IS 1239 ISI mark with GI fittings
including the cost of pipe & its fittings & labour charges complete
40mm Nominal bore GI pipe water supply line
S & F 40 mm Nominal Bore GI pipe Medium Grade 1 Rmt #REF! 1 Rmt #REF!
properties & weight as per IS 1239 ISI mark with GI
fittings (BMW-F.75,Sn.286) 2014-15- SSR
Add Municipal Allowence labour charges( as per 20% #REF! #REF!
-BMW-F.76 - Sn.287) -2014-15 SSR
Supply of 19/20mm PVC Flexible Pipe. as per 1 Rmt #REF! 1 Rmt #REF!
2014-15 SSR item ELEC-1.2.23, Sn.74
#REF!
c&d) Overheads & Contractors Profit 14% #REF!
Total #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!

f a) S& F 50 mm Nominal Bore GI pipe Light Grade properties & weight as per IS 1239 ISI mark with GI fittings
including the cost of pipe & its fittings & labour charges complete
50mm Nominal bore GI pipe water supply line
S & F 50 mm Nominal Bore GI pipe Medium Grade 1 Rmt #REF! 1 Rmt #REF!
properties & weight as per IS 1239 ISI mark with GI
fittings (BMW-F.77,Sn.288) 2014-15 SSR

447524687.xlsx - data-Road
Add Municipal Allowence labour charges( as per 20%
Page 1616 of 2191 #REF! #REF!
-BMW-F.78 - Sn.289) -2014-15 SSR
Supply of 19/20mm PVC Flexible Pipe. as per 1 Rmt #REF! 1 Rmt #REF!
2014-15 SSR item ELEC-1.2.23, Sn.74
#REF!
c&d) Overheads & Contractors Profit 14% #REF!
Total #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!

10 Providing temporary U PVC rider mains for sewage connections so as not to distrub the existing sewerage
connections during earth work excavation for trenches and during laying of new mains including cost and
conveyance of all materials, labour charges and with all incidental and operational charges etc., complete.
110mm dia U PVC 4 kg/SqCm
110mm dia PVC pipe as per data sheet 1 Rmt 215.43 1 Rmt 215.43
Lowering charges 1 Rmt 25.75 1 Rmt 25.75
Earth work Excavation charges -1x0.6*0.6 = 0.36 0.36 Cum 132.49 1 Cum 47.70
cum 288.88
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt including 14% CP Rs 336.58

11 BLD-CSTN-3-7-Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:5:10)
prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including
cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on
all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the
required level curing etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:
Cement (ENC-PH.Memo.No.146/Cement & Steel / 129.60 Kg 4.600 1 Kg 596.16
T1
Coarse aggregate 40mm graded ( C-Mat- S.No-57) 0.90 Cum Err:509 1 Cum Err:509
Fine aggregate (Sand) ( C-Mat-S.N.2 ) 0.45 Cum 1303.00 1 Cum 586.35
Water (including for curing) -M-189-b. irrigation 1.20 Kl 98.00 1 Kl 117.60
SSR
B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity 1 hour 397.50 1 hour 397.50
(Hire
C. charges-Irrigation- S.N.16)
LABOUR:
Mason 1st class (labour-Irrigation.S.N.11) 0.10 Nos 564.00 1 Nos 56.40
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 1.39 Nos 510.00 1 Nos 708.90
Sub- Total Rs Err:509
d) Overheads & Contractors Profit 14% Err:509
Rate per cu.m. Rs Err:509
VAT & labour cess 0% Err:509
Rate per 1 Cum Err:509

12 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix
(1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage
charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top
surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:
Cement-(ENC-PH.Memo.No.146/Cement&Steel / 162.00 Kg 4.60 1 Kg 745.20
T1
Coarse aggregate 40mm graded ( C-Mat- S.No-57) 0.90 Cum Err:509 1 Cum Err:509
Fine aggregate (Sand) ( C-Mat-S.N.2 ) 0.45 Cum 1303.00 1 Cum 586.35
Water (including for curing) -M-189-b. irrigation 1.20 Kl #REF! 1 Kl #REF!
SSR
B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity 1 hour 397.50 1 hour 397.50
(Hire
C. charges-Irrigation- S.N.16)
LABOUR:

447524687.xlsx - data-Road
Mason 1st class (labour-Irrigation.S.N.11) 0.10 Nos
Page 1617 of 2191 564.00 1 Nos 56.40
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 1.39 Nos 510.00 1 Nos 708.90
Grand Total Rs Err:509
Overheads & Contractors Profit 14% Err:509
Rate per cu.m. Rs Err:509
VAT & Labour cess. 0% Err:509
Rate per 1 Cum Rs Err:509

13 BLD-CSTN-3-10- ( 27 ) Hand mixing : Plain Cement concrete nominal mix (1:3:6) prop (Cement : fine aggregate:
coarse aggregate ) using 20mm size Hard Granite Machine Crushed Metal including cost and conveyance of all
materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing
etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:
Water (including for curing) -M-189-b. irrigation SSR 220.00 Kg 4.60 1 Kg 1012.00
Coarse aggregate 20mm graded (C-Mat-Sn.48) 0.90 Cum Err:509 1 Cum Err:509
Fine aggregate (Sand) 0.45 Cum 1303.00 1 Cum 586.35
Water (including for curing) 1.20 Kl #REF! 1 Kl #REF!
B. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11) 0.10 day 564.00 1 day 56.40
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 2.36 day 510.00 1 day 1203.60
Sub - Total Rs Err:509
c.Overheads & Contractors Profit 14% Err:509
Rate per cu.m. Rs Err:509
VAT & Labour cess. 0% Err:509
Rate per 1 Cum Rs Err:509

14 BLD-CSTN -3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix M-20
(Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage
charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top
surface to the required level curing etc., complete for finished item of work with nomonal reinforcement
PCC -M-20
Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1 330.00 Kg 4.60 1 Kg 1518.00
20mm HBG graded metal- ( as per Lead S.No-49) 0.90 Cum Err:509 1 Cum Err:509
Sand (C-Mat-Lead statement-S.No.1) 0.45 Cum 1303.00 1 Cum 586.35
Water (including for curing) -M-189-b. irrigation 1.20 Kl #REF! 1 Kl #REF!
SSR
Mason 1st class (labour-Irrigation.S.N.11) 0.10 Nos. 564.00 1 Each 56.40
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 1.39 Nos. 510.00 1 Each 708.90
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity 1.00 hour 397.50 1 hour 397.50
(Hire charges-Irrigation- S.N.16) Err:509
VAT & Labour cess. 0% Err:509
BASIC COST per 1 cum Rs Err:509

a Pedastals / Thrust blocks/ Anchor blocks


P.C.C. - M-20 Per Cum 1.00 Cum Err:509 1 Cum Err:509
Centering charges ,Pg No. 84 to 89 of Bld. Items 1.00 Cum 328.00 1 Cum 328.00
Labour charges,Pg No. 84 to 89 of Bld. Items 1.00 Cum 1004.00 1 Cum 1004.00
Add Labour component @ 20% 200.80
Err:509
Overheads & Contractors Profit 14% Err:509
Total Err:509
VAT & Labour cess. 0% Err:509
Rate per One Cum Rs Err:509

b CC (1:2:4) walls of ----mm thick ness 0.20 m


447524687.xlsx - data-Road
P.C.C. - M-20 Per Cum 1.00 Cum
Page 1618 of 2191 Err:509 1 Cum Err:509
Centering charges rate s per Sl. No. Q of page 5.00 Sqm 1063.00 1 Sqm 5315.00
No.7- Sn. 31.b.4
Rs Err:509
Overheads & Contractors Profit 14% Err:509
Total Err:509
VAT & Labour cess. 0% Err:509
Rate per One Cum Rs Err:509

c P.C.C. - M-20 for 0.910 Mts at bottom,0.53 at


top, 100mm thick ring of 1.00 m height with
nomonal reinforcement
Qty of Ring = Πx(((0.552 -0.452)+(0.382-0.282))/2 x
1
Basic Rate per Cum. 0.33 Cum Err:509 1 Cum Err:509
Centering Charges for Bed Blocks and Bands 0.33 Cum 64.00 1 Cum 21.12
Labour charges 0.33 Cum 325.00 1 Cum 107.25
Add Labour component @ 20% 21.45
add steel @ 50 Kg/ Cum (cost excluding 14% CP) 16.50 Kg Err:509 1 Kg Err:509
Total Rs Err:509
Overheads & Contractors Profit 14% Err:509
VAT & Labour cess. 0% Err:509
Rate per each ring Rs Err:509

d Supply & fixing CC (1:2:4) cover 1.00m x 0.45


m in panels with nominal reinforcement 100mm
thick and hooks for lifting
Basic Rate of CC (1:2:4) -1.0x0.45 x0.075 0.034 Cum Err:509 1 Cum Err:509
Add Centering charges 0.034 Cum 160.00 1 Cum 5.40
add steel @ 75 Kg/ Cum 2.53 Kg Err:509 1 Kg Err:509
Total Err:509
Overheads & Contractors Profit 14% Err:509
Rate per each slab of 1.00m x 0.45m- 0.1m thick Rs. Err:509

15 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix M-30 (Cement :
fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost
and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all
materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the
required level curing etc., complete for finished item of work with nomonal reinforcement for Road restoration.

PCC -M-30
Cement-(ENC-PH.Memo.No.146/Cement&Steel / 400.00 Kg 4.60 1 Kg 1840.00
T1
20mm HBG graded metal- ( as per Lead S.No-49) 0.90 Cum 1406.20 1 Cum 1265.58
Sand (C-Mat-Lead statement-S.No.1) 0.45 Cum 1303.00 1 Cum 586.35
Water (including for curing) -M-189-b. irrigation 1.20 Kl #REF! 1 Kl #REF!
SSR
Mason 1st class (labour-Irrigation.S.N.11) 0.10 Nos. 564.00 1 Each 56.40
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 1.39 Nos. 510.00 1 Each 708.90
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity 1.00 hour 397.50 1 hour 397.50
(Hire charges-Irrigation- S.N.16) #REF!
Overheads & Contractors Profit 14% #REF!
#REF!
VAT & Labour cess. 0% #REF!
BASIC COST per 1 cum Rs #REF!

16 BLD-CSTN-3-12-(29) Using Concrete mixture : Plain Cement concrete (M 15) Nominal Mix 1:2.5:5 (Cement : fine
aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and
conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all
materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the
required level curing etc., complete for finished item of work with nomonal reinforcement

447524687.xlsx - data-Road
Unit : 1cum Page 1619 of 2191
A. MATERIALS:
Cement-(ENC-PH.Memo.No.146/Cement&Steel / 330.00 Kg 4.60 1 Kg 1518.00
T1
20mm HBG graded metal- ( as per Lead S.No-49) 0.90 Cum Err:509 1 Cum Err:509
Sand (C-Mat-Lead statement-S.No.1) 0.45 Cum 1303.00 1 Cum 586.35
Water (including for curing) -M-189-b. irrigation 1.20 Kl #REF! 1 Kl #REF!
SSR
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity 1 hour 397.50 1 hour 397.50
B. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11) 0.10 day 564.00 1 day 56.40
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 1.39 day 510.00 1 day 708.90
Sub - Total Rs Err:509
c.Overheads & Contractors Profit 14% Err:509
Grand Total Err:509
VAT & Labour cess. 0% Err:509
Rate per 1 Rmt Err:509

17 BLD-CSTN-3-13-(30)-C ; RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to


Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved
quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of
steel and its fabrication charges for finished item of work, but excluding centering, shuttering . for RCC SLABS,
BEAMS
RCC SLABS, BEAMS -WOODEN SCAFFOLDING
A. MATERIALS:
20mm HBG graded metal- ( as per Lead S.No-49) 0.90 cum Err:509 1 Cum Err:509
Sand (C-Mat-Lead statement-S.No.1) 0.45 cum 1303.00 1 Cum 586.35
Cement-(ENC-PH.Memo.No.146/Cement&Steel / 400.00 Kgs 4.60 1 Cum 1840.00
T1 Sub Total of - A Err:509
B. LABOUR:
Mason 1st class (labour-Irri-Skilled .S.N.11) 0.067 day 564.00 1 Cum 37.79
2nd Class Mason (labour-Irri-Semi skilled.S.N.35) 0.133 day 540.00 1 Cum 71.82
Mazdoor (Both Men and Women) (irri-Un skilled- 2.500 day 510.00 1 Cum 1275.00
Sn.3) Sub Total of - B 1384.61
C. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity 0.267 hour 397.50 1 Cum 106.13
(Hire charges-Irrigation-
Vibrator hire charges S.N.16)
( Hire charges-irrigation. 0.267 hour 205.00 1 hour 54.74
Sn.41)
Water (including for curing) -M-189-b. irrigation 1.200 kl #REF! 1 Cum #REF!
SSR Sub Total of - C #REF!
BASIC COST per 1 cum Err:509
Overheads & Contractors Profit 14% Err:509
Total Err:509
VAT & Labour cess. 0% Err:509
Rate per One Cum Rs Err:509

a for pre cast/ Cast-in-situ Chamber cover not


exceeding 0.45m width with hooks for lifting
ii RCC M 20 Slabs 150 mm Thick 0.15 m
R.C.C. M 20 nominal mix Per Cum 1.00 Cum Err:509 1 Cum Err:509
Centering charges ,Pg No.106 to 108 6.67 Sqm 158.00 1 Sqm 1053.86
Labour charges,Pg No.106 to 108 6.67 Sqm 167.00 1 Sqm 1113.89
Add Labour component @ 20% 222.78
Sub - Total Rs Err:509
Overheads & Contractors Profit 14% Err:509
Total 6803.71
VAT & Labour cess. 0% 0.00
Rate per One Cum Rs 6803.71

447524687.xlsx - data-Road
18 BLD-CSTN-6-4: Plastering with 12mm thick Page in single coat in CM (1:4) finished smooth including cost and
1620 of 2191
conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all
operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for
finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:4) 0.15 Cum 3325.65 1 Cum 498.85
B. LABOUR:
Mason 1st class (labour-Irri-Skilled .S.N.11) 0.60 Nos 564.00 1 Nos 338.40
Mazdoor (irri-Un skilled-Sn.3) 0.96 Nos 510.00 1 Nos 489.60
Total A+B 1326.85
C.Overheads & Contractors Profit 14% 180.65
Grand Total 1507.50
VAT & Labour cess. 0% 0.00
Rate per 10 Sqm Rs 1507.50

19 BLD-CSTN-8-8-(83) : Plastering with 20mm thick in single coat in CM (1:3) finished smooth including cost and
conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all
operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for
finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:3) 0.21 Cum 3877.65 1 Cum 814.31
B. LABOUR:
Mason 1st class (labour-Irri-Skilled .S.N.11) 0.94 Nos 564.00 1 day 530.16
Mazdoor (irri-Un skilled-Sn.3) 0.16 Nos 510.00 1 day 81.60
Total A+B 1426.07
C.Overheads & Contractors Profit 13.62% 194.16
Sub-Total 1620.23
VAT & labour cess 0% 0.00
Rate per 10 Sqm Rs 1620.23

20 BLD-CSTN-10-25-(148) : Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick
with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials,
seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and labour
charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab
etc,, complete for finished item of work

Unit = 10 sqm
A. MATERIALS:
Cement Mortal 1:3 0.210 Nos 3877.65 1 Nos 814.31
Water proof compound -BMT-H.01- item no.241 2.000 Kg #REF! 1 Kg #REF!
B. LABOUR
Mason 1st class (labour-Irri-Skilled .S.N.11) 0.660 Nos 564.00 1 Nos 372.24
2nd Class Mason (labour-Irri-Semi skilled.S.N.35) 1.540 Nos 540.00 1 Nos 831.60
Mazdoor (Both Men and Women) (irri-Un skilled- 3.70 Nos 510.00 1 Nos 1887.00
Sn.3)
Total Rs #REF!
over heads & contractors profit 14% #REF!
Total cost for 10 sqm #REF!
VAT & labour cess 0% #REF!
Rate per 10 Sqm Rs #REF!

21 BLD-CSTN-9-5: White washing two coats with whiting of approved quality to give an even shade after thoroughly
brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour
charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding
conveyance charges of materials
Whiting / White Cement -BMS-W.68-item-1012 2.00 Kg #REF! 1 Kg #REF!
Gum, conjee water, or prickly pear juice including LS 10.00
necessary fire wood
Brick Layers / Painter ( labour - Irri-Skilled-Sn.11) 0.21 Nos 564.00 1 Nos 118.44
Mazdoor (Both Men and Women) (irri-Un skilled- 0.32 Nos 510.00 1 Nos 163.20
Sn.3) #REF!
447524687.xlsx - data-Road
Sundries including brushes, ladders, etc., 1%
Page 1621 of 2191 #REF!
Rs #REF!
over heads & contractors profit 14% #REF!
Sub-Total #REF!
VAT & labour cess 0% #REF!
Rate per 10 Sqm Rs #REF!

22 BLD-CSTN-12-12-(193): Painting with Synthetic Enamel paints - One Coat - for New Wood Work, Old Wood Work &
New Iron Work including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and
all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).
Synthetic Enamel paint (at 20 sqm / litre as per 0.70 Ltr #REF! 1 Ltr #REF!
British Paints (I) Ltd.- (BMT-J.31-Sn-400)
1st Class Painter (I. Skilled Labour-Irrigation-Sn.35) 0.21 day. 648.00 1 day. 136.08
2nd Class Painter (II. Semi skilled Labour-Irri- 0.49 day. 540.00 1 day. 264.60
Sn.37)
Sundries including brushes, soap, putty etc., 0.00
Total Rs #REF!
over heads & contractors profit 14% #REF!
Total cost for 10 sqm #REF!
VAT & Labour cess. 0% #REF!
Rate per 10 Sqm Rs #REF!

23 BLD-CSTN-4-1-(34) : Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild
steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including
labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks
of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all
wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover
blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including
sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126

Unit = t
(a) Material
HYSD bars including 5 per cent for overlaps and 1.05 Ton Err:509 1 Ton Err:509
wastage
Binding wire- SSR (Irrigation) item No 3, Pg 11 6.00 kg #REF! 1 kg #REF!
B) LABOUR for cutting, bending, shifting to site,
tying, lap splicing and placing in position
Blacksmith/ Bar bender ( Labour-Irrigation-Skilled- 10.00 day 678.00 1 day 6780.00
Sn.1)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 10.00 day 510.00 1 day 5100.00
Sundries on Material
Err:509
(c) Overheads on (a+b)
(d) Contractor’s profit on (a+b+c) 14% Err:509
Rate per t = a+b+c+d 1 MT Err:509
VAT & Labour cess. 0% Err:509
Rate per One MT Sub Total: Err:509
Rate per One Kg Rs. Err:509

24 COST OF PIPES, LOWERING AND JOINTING CHARGES

* Cost of DI pipes as per separate sheet

A Lowering of DI pipes
Sub Analysis for Lowering
Lowering C.I. Pipes, A class and specials with s/s ends carefully into trench and laying them true to alignment and
* gradient including all sundries but excluding cost and conveyance of pipes from source of supply. (Reference to
specifications. BIS No.3114/94)
Assumtion 10 m
200 mm dia CI pipes 5m long (class ‘A’)
Weight = 2 x 257 kgs = 514 kgs = 5.14 quintal
(a) LABOUR:
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36) 0.102 day 648.00 1 day 66.10
447524687.xlsx - data-Road
Plumber 2nd class ( Labour-Irrigation-S.Skilled-
Page 1622 of0.238
2191 day 540.00 1 day 128.52
Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 1.330 day 510.00 1 day 678.30
(b) Cost for 10 metres 872.92
Rate per metre = b/10 87.29
Rate for 1 kg = b/514 1.698

25 PHE-LCIS-1 : Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with s/s ends carefully into trenches
and laying them true to alignment and gradient including all sundries but excluding cost and conveyance of pipes
from source of supply (Ref to specifications. BIS No.3114/1994)
Note : The Labour charges for cost of Lowering & Laying per 1 kg weight shall be as per sub-analysis made
for 200 mm dia CI Pipes S/s ends.
Details of cost for 5m
a Lowering 80 mm dia DI pipe
Weight of 5m length = (79 +85.5 + 92)/3 = 85.5 kgs
(a) Labour charges for laying 85.500 Kg 1.698 1 Kg 145.18
(b) Overheads & Contractors Profit 14% 19.77
(c) Cost for 5 metres = a+b 164.95
Rate per metre = c/5 32.99
VAT & Labour cess. 0% 0.00
Rate per each cut Rs 32.99

b Lowering 100 mm dia DI pipe


Weight of 5m length = (100+109+117)/3 = 108.67
kgs
(a) Labour charges for laying 108.670 Kg 1.698 1 Kg 184.52
(b) Overheads & Contractors Profit 14% 25.12
(c) Cost for 5 metres = a+b 209.64
Rate per metre = c/5 41.93
VAT & Labour cess. 0% 0.00
Rate per each cut Rs 41.93

c Lowering 125 mm dia DI pipe


Weight of 5m length = (130+141+153)/3 = 141.33
kgs
(a) Labour charges for laying 141.330 Kg 1.698 1 Kg 239.98
(b) Overheads & Contractors Profit 14% 32.67
(c) Cost for 5 metres = a+b 272.65
Rate per metre = c/5 54.53
VAT & Labour cess. 0% 0.00
Rate per each cut Rs 54.53

d Lowering 150mm dia DI pipe


Weight of 5m length = (162+178+191)/3 = 177 kgs
(a) Labour charges for laying 177.000 Kg 1.698 1 Kg 300.55
(b) Overheads & Contractors Profit 14% 40.92
(c) Cost for 5 metres = a+b 341.47
Rate per metre = c/5 68.29
VAT & Labour cess. 0% 0.00
Rate per each cut Rs 68.29

e Lowering 200 mm dia DI pipe


Weight of 5m length = (237+257+278)/3 = 257.33
kgs
(a) Labour charges for laying 257.330 Kg 1.698 1 Kg 436.95
(b) Overheads & Contractors Profit 14% 59.49
(c) Cost for 5 metres = a+b 496.44
Rate per metre = c/5 99.29
VAT & Labour cess. 0% 0.00
Rate per each cut Rs 99.29

f Lowering 250 mm dia DI pipe


447524687.xlsx - data-Road
Weight of 5m length = (319+348+376)/3 = 347.67
Page 1623 of 2191
kgs
(a) Labour charges for laying 347.670 Kg 1.698 1 Kg 590.34
(b) Overheads & Contractors Profit 14% 80.37
(c) Cost for 5 metres = a+b 670.71
Rate per metre = c/5 134.14
VAT & Labour cess. 0% 0.00
Rate per each cut Rs 134.14

g Lowering 300 mm dia DI pipe


Weight of 5m length = (412+450+487)/3 = 449.67
kgs
(a) Labour charges for laying 449.670 Kg 1.698 1 Kg 763.54
(b) Overheads & Contractors Profit 14% 103.96
(c) Cost for 5 metres = a+b 867.50
Rate per metre = c/5 173.50
VAT & Labour cess. 0% 0.00
Rate per each cut Rs 173.50

h Lowering 350 mm dia DI pipe


Weight of 5m length =(519+563+610)/3=564
(a) Labour charges for laying 564.000 Kg 1.698 1 Kg 957.67
(b) Overheads & Contractors Profit 14% 130.39
(c) Cost for 5 metres = a+b 1088.06
Rate per metre = c/5 217.61
VAT & Labour cess. 0% 0.00
Rate per each cut Rs 217.61

i Lowering 400 mm dia DI pipe


Weight of 5m length =(631+690+744)/3=688.33
(a) Labour charges for laying 688.330 Kg 1.698 1 Kg 1168.78
(b) Overheads & Contractors Profit 14% 159.13
(c) Cost for 5 metres = a+b 1327.91
Rate per metre = c/5 265.58
VAT & Labour cess. 0% 0.00
Rate per each cut Rs 265.58

j Lowering 450mm dia DI pipe


Weight of 5m length =(761+836+901)/3=832.67
(a) Labour charges for laying 832.670 Kg 1.698 1 Kg 1413.87
(b) Overheads & Contractors Profit 14% 192.5
(c) Cost for 5 metres = a+b 1606.37
Rate per metre = c/5 321.27
VAT & Labour cess. 0% 0.00
Rate per each cut Rs 321.27

k Lowering 500 mm dia DI pipe


Weight of 5m length =(892+971+1049)/3=970.67
(a) Labour charges for laying 970.670 Kg 1.698 1 Kg 1648.20
(b) Overheads & Contractors Profit 14% 224.4
(c) Cost for 5 metres = a+b 1872.60
Rate per metre = c/5 374.52
VAT & Labour cess. 0% 0.00
Rate per each cut Rs 374.52

l Lowering 600 mm dia DI pipe


Weight of 5m length =(1188+1296+1404)/3=1296
(a) Labour charges for laying 1296.000 Kg 1.698 1 Kg 2200.61
(b) Overheads & Contractors Profit 14% 299.61
(c) Cost for 5 metres = a+b 2500.22
447524687.xlsx - data-Road
Rate per metre = c/5 Page 1624 of 2191 500.04
VAT & Labour cess. 0% 0.00
Rate per each cut Rs 500.04

m Lowering 700mm dia DI pipe


Weight of 5m length =(1533+1675+1808)/3=1672
(a) Labour charges for laying 1672.000 Kg 1.698 1 Kg 2839.06
(b) Overheads & Contractors Profit 14% 386.54
(c) Cost for 5 metres = a+b 3225.60
Rate per metre = c/5 645.12
VAT & Labour cess. 0% 0.00
Rate per each cut Rs 645.12

n Lowering 750 mm dia DI pipe


Weight of 5m length
=(1718+1876+2029)/3=1874.33
(a) Labour charges for laying 1874.330 Kg 1.698 1 Kg 3182.61
(b) Overheads & Contractors Profit 14% 433.31
(c) Cost for 5 metres = a+b 3615.92
Rate per metre = c/5 723.18
VAT & Labour cess. 0% 0.00
Rate per each cut Rs 723.18

o Lowering 800 mm dia DI pipe


Weight of 5m length
=(1922+2093+2263)/3=2092.67
(a) Labour charges for laying 2092.670 Kg 1.698 1 Kg 3553.35
(b) Overheads & Contractors Profit 14% 483.79
(c) Cost for 5 metres = a+b 4037.14
Rate per metre = c/5 807.43
VAT & Labour cess. 0% 0.00
Rate per each cut Rs 807.43

p Lowering 900 mm dia DI pipe


Weight of 5m length =(2342+2544+2766)/3=2554
(a) Labour charges for laying 2544.000 Kg 1.698 1 Kg 4319.71
(b) Overheads & Contractors Profit 14% 588.13
(c) Cost for 5 metres = a+b 4907.84
Rate per metre = c/5 981.57
VAT & Labour cess. 0% 0.00
Rate per each cut Rs 981.57

q Lowering 1000 mm dia DI pipe


Weight of 5m length =(2814+3072+3318)/3=3068
(a) Labour charges for laying 3068.000 Kg 1.698 1 Kg 5209.46
(b) Overheads & Contractors Profit 14% 709.27
(c) Cost for 5 metres = a+b 5918.73
Rate per metre = c/5 1183.75
VAT & Labour cess. 0% 0.00
Rate per each cut Rs 1183.75

B Jointing of DI pipes
Sub Analysis : (Basic Data) for Jointing of DI Pipes

*
OBSERVED DATA FOR TESTING OF 450 MM DIA PSC MAIN : Pumping main to Hydralic field test pressure
including transportation of Water with minimum lead of 500 M
(Length = 500 Mts) taking out put / 500 Mts. Unit = 1 Rmt.
Labour
Fitters (2 x 3 days)
Fitters I Class ( Labour-Irrigation-Skilled-Sn.6) 3.000 day 648.00 1 day 1944.00
447524687.xlsx - data-Road
Fitters II Class ( Labour-Irrigation-semi Skilled-Sn.9)
Page 1625 of3.000
2191 day 540.00 1 day 1620.00
Machinery
Hire chargers for Hydralic field test pressure testing 3.000 days 1200.00 1 days 3600.00
including transportation of water @ Rs. 1200/-
(1000+200) / day
Materials
Pressure guage 0.050 Nos 500.00 1 Nos25.00
3/4" G.I. Pipe (20 mm) ( excluding labour charges) 3.000 RM #REF! 1 RM#REF!
Specials 1 Ls 500.00 1 Ls
500.00
Dummies 0.100 No. 1500.00 1 Each
150.00
Diesel (2 Lts. / Hr) 30 Hrs.(item No.4 of Pg.22-Irri. SSR) 60.000 Lts. #REF! 1 Lts.
#REF!
(T) Total Rate per 500 Mts. #REF!
(r) Rate per 1 Rmt for 450 mm dia #REF!
(R) Rate per 1 Rmt for 10 mm dia = (10/450) x r #REF!
Note : Proportionate Testing Charges may be arrived, keeping the diametre of pipe based on this analysis,
for an varities of pipes for various Dia Pipes.

26 PHE-JCIR-4 : Jointing C.I., D.I. pipes and fittings with rubber gasket (push-on-joint), excluding the cost of the
gasket but including all sundries filling with water, with a water lead up to 500m and testing to required pressure, etc.
complete Reference to specifications IS 3114/1994/12888/1987
Note : Rubber Gaskets shall be added seperately.

Details of cost for 10 Joints


a Jointing 80 mm dia DI pipe 80 mm dia
a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled- 0.300 day 540.00 1 day 162.00
Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 0.800 day 510.00 1 day 408.00
570.00
b) Material
Rubber gasket - each
c) Testing
Testing of Pipelines with required pressure as per 50.000 rm #REF! 1 rm #REF!
relevant IS Specification including filling with water
with a water lead upto 500 M, including hire
charges of testing equipment, labour and Materials
needed for testing (as per Sub Analysis 2 A)

(d) Total = a+b+c #REF!


(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!

b Jointing 100 mm dia DI pipe 100 mm dia


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled- 0.500 day 540.00 1 day 270.00
Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 1.000 day 510.00 1 day 510.00
780.00
b) Material
Rubber gasket each
c) Testing
Testing of Pipelines with required pressure (as per 50.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
447524687.xlsx - data-Road
(f) Total = d+e+f Page 1626 of 2191 #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!

c Jointing 125 mm dia DI pipe 125 mm dia


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled- 0.500 day 540.00 1 day 270.00
Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 1.000 day 510.00 1 day 510.00
780.00
b) Material
Rubber gasket each
c) Testing
Testing of Pipelines with required pressure (as per 50.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e+f #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!

d Jointing 150 mm dia DI pipe 150 mm dia


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled- 0.600 day 540.00 1 day 324.00
Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 1.100 day 510.00 1 day 561.00
885.00
b) Material
Rubber gasket each
c) Testing
Testing of Pipelines with required pressure (as per 50.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e+f #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!

e Jointing 200 mm dia DI pipe 200 mm dia


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled- 0.600 day 540.00 1 day 324.00
Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 1.100 day 510.00 1 day 561.00
885.00
b) Material
Rubber gasket each
c) Testing
Testing of Pipelines with required pressure (as per 50.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!

447524687.xlsx - data-Road
(e) Add for water charges @ 1% on LabourPage& 1627 of 2191 #REF!
Testing Charges
(f) Total = d+e+f #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!

f Jointing 250 mm dia DI pipe 250 mm dia


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled- 0.620 day 540.00 1 day 334.80
Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 1.200 day 510.00 1 day 612.00
946.80
b) Material
Rubber gasket each
c) Testing
Testing of Pipelines with required pressure (as per 50.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e+f #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!

g Jointing 300 mm dia DI pipe 300 mm dia


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled- 0.800 day 540.00 1 day 432.00
Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 1.200 day 510.00 1 day 612.00
1044.00
b) Material
Rubber gasket each
c) Testing
Testing of Pipelines with required pressure (as per 50.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e+f #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!

h Jointing 350 mm dia DI pipe 350 mm dia


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled- 0.900 day 540.00 1 day 486.00
Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 1.500 day 510.00 1 day 765.00
1251.00
b) Material
Rubber gasket each
c) Testing
Testing of Pipelines with required pressure (as per 50.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!

447524687.xlsx - data-Road
(e) Add for water charges @ 1% on LabourPage& 1628 of 2191 #REF!
Testing Charges
(f) Total = d+e+f #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!

i Jointing 400 mm dia DI pipe 400 mm dia


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled- 1.000 day 540.00 1 day 540.00
Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 1.500 day 510.00 1 day 765.00
1305.00
b) Material
Rubber gasket each
c) Testing
Testing of Pipelines with required pressure (as per 50.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e+f #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!

j Jointing 450 mm dia DI pipe 450 mm dia


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled- 1.200 day 540.00 1 day 648.00
Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 1.700 day 510.00 1 day 867.00
1515.00
b) Material
Rubber gasket each
c) Testing
Testing of Pipelines with required pressure (as per 50.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e+f #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!

k Jointing 500 mm dia DI pipe 500 mm dia


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled- 1.300 day 540.00 1 day 702.00
Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 1.800 day 510.00 1 day 918.00
1620.00
b) Material
Rubber gasket each
c) Testing
Testing of Pipelines with required pressure (as per 50.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!

447524687.xlsx - data-Road
(e) Add for water charges @ 1% on LabourPage& 1629 of 2191 #REF!
Testing Charges
(f) Total = d+e+f #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!

l Jointing 600 mm dia DI pipe 600 mm dia


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled- 1.500 day 540.00 1 day 810.00
Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 2.000 day 510.00 1 day 1020.00
1830.00
b) Material
Rubber gasket each
c) Testing
Testing of Pipelines with required pressure (as per 50.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e+f #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!

m Jointing 650 mm dia DI pipe 650 mm dia


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled- 1.600 day 540.00 1 day 864.00
Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 2.100 day 510.00 1 day 1071.00
1935.00
b) Material
Rubber gasket each
c) Testing
Testing of Pipelines with required pressure (as per 50.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e+f #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!

n Jointing 700 mm dia DI pipe 700 mm dia


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled- 1.700 day 540.00 1 day 918.00
Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 2.200 day 510.00 1 day 1122.00
2040.00
b) Material
Rubber gasket each
c) Testing
Testing of Pipelines with required pressure (as per 50.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!

447524687.xlsx - data-Road
(e) Add for water charges @ 1% on LabourPage& 1630 of 2191 #REF!
Testing Charges
(f) Total = d+e+f #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!

o Jointing 750 mm dia DI pipe 750 mm dia


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled- 1.700 day 540.00 1 day 918.00
Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 2.200 day 510.00 1 day 1122.00
2040.00
b) Material
Rubber gasket each
c) Testing
Testing of Pipelines with required pressure (as per 50.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e+f #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!

p Jointing 800 mm dia DI pipe 800 mm dia


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36) 2.350 day 648.00 1 day 1522.80

Plumber 2nd class ( Labour-Irrigation-S.Skilled- 4.700 day 540.00 1 day 2538.00


Sn.9)
Foreman (work inspector) Non technical (Labour 0.650 day 678.00 1 day 440.70
-Irrigation-Skilled -Sn.10)
4501.50
b) Material
Rubber gasket each
c) Testing
Testing of Pipelines with required pressure (as per 50.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e+f #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!

q Jointing 900 mm dia DI pipe 900 mm dia


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36) 2.750 day 648.00 1 day 1782.00
Plumber 2nd class ( Labour-Irrigation-S.Skilled- 5.500 day 540.00 1 day 2970.00
Sn.9)
Foreman (work inspector) Non technical (Labour 0.700 day 678.00 1 day 474.60
-Irrigation-Skilled -Sn.10)
5226.60
b) Material
Rubber gasket each

447524687.xlsx - data-Road
c) Testing Page 1631 of 2191
Testing of Pipelines with required pressure (as per 50.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e+f #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!

r Jointing 1000 mm dia DI pipe 1000 mm dia


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36) 3.000 day 648.00 1 day 1944.00
Plumber 2nd class ( Labour-Irrigation-S.Skilled- 6.000 day 540.00 1 day 3240.00
Sn.9)
Foreman (work inspector) Non technical (Labour 0.750 day 678.00 1 day 508.50
-Irrigation-Skilled -Sn.10)
5692.50
b) Material
Rubber gasket each
c) Testing
Testing of Pipelines with required pressure (as per 50.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e+f #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!

27 PHE-JCIF-5 : Jointing CI pipes, fittings and valves with flanged ends including cost of jointing materials
such as bolts, rubber insertion, white lead including filling with water, with lead up to 500 meters and testing to
required pressure complete. (Reference to specifications. BIS No.3114/1994.)
Details of cost for 10 joints
a 80 mm dia 80 mm dia
a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36) 0.090 day 648.00 1 day 58.32
Plumber 2nd class ( Labour-Irrigation-S.Skilled- 0.210 day 540.00 1 day 113.40
Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 0.800 day 510.00 1 day 408.00
579.72
b) Material
Bolts and nuts 16mm dia 60mm long ( Sn.5-Table- 6.800 kg 123.00 1 kg 836.40
31,Pg.82-2014-15)
Rubber insertion 5mm thick (Sn-4-Table-31,Pg.82- 2.125 kg 103.00 1 kg 218.88
2014-15)
White lead -
c) Testing
Testing of Pipelines with required pressure as per 27.500 rm #REF! 1 rm #REF!
relevant IS Specification including filling with water
with a water lead upto 500 M, including hire
charges of testing equipment, labour and Materials
needed for testing (as per Sub Analysis 2 A)

(d) Total = a+b+c #REF!

447524687.xlsx - data-Road
(e) Add for water charges @ 1% on LabourPage & 1632 of 2191 #REF!
Testing Charges
(f) Total = d+e #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each joint Rs #REF!

b 100 mm dia DI flanged ends 100 mm dia


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36) 0.150 day 648.00 1 day 97.20
Plumber 2nd class ( Labour-Irrigation-S.Skilled- 0.350 day 540.00 1 day 189.00
Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 1.000 day 510.00 1 day 510.00
796.20
b) Material
Bolts and nuts 16mm dia 60mm long 13.600 kg 123.00 1 kg 1672.80
Rubber insertion 5mm thick 2.540 kg 103.00 1 kg 261.62
White lead
c) Testing
Testing of Pipelines with required pressure (as per 27.500 rm #REF! 1 rm #REF!
Sub Analysis
(d) Total 2 A)
= a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e+f #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each joint Rs #REF!

c 125 mm dia DI flanged ends 125 mm dia


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36) 0.150 day 648.00 1 day 97.20
Plumber 2nd class ( Labour-Irrigation-S.Skilled- 0.350 day 540.00 1 day 189.00
Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 1.000 day 510.00 1 day 510.00
796.20
b) Material
Bolts and nuts 16mm dia 60mm long 13.600 kg 123.00 1 kg 1672.80
Rubber insertion 5mm thick 3.140 kg 103.00 1 kg 323.42
White lead
c) Testing
Testing of Pipelines with required pressure (as per 27.500 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e+f #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each joint Rs #REF!

d 150 mm dia DI flanged ends 150 mm dia


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36) 0.180 day 648.00 1 day 116.64
Plumber 2nd class ( Labour-Irrigation-S.Skilled- 0.420 day 540.00 1 day 226.80
Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 1.100 day 510.00 1 day 561.00
904.44
b) Material
447524687.xlsx - data-Road
Bolts and nuts 20mm dia 65mm long Page 1633 24.000
of 2191 kg 123.00 1 kg 2952.00
Rubber insertion 5mm thick 4.300 kg 103.00 1 kg 442.90
White lead
c) Testing
Testing of Pipelines with required pressure (as per 27.500 rm #REF! 1 rm #REF!
Sub Analysis 2
(d) Total = a+b+cA) #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e+f #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each joint Rs #REF!

e 200 mm dia DI flanged ends 200 mm dia


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36) 0.180 day 648.00 1 day 116.64
Plumber 2nd class ( Labour-Irrigation-S.Skilled- 0.420 day 540.00 1 day 226.80
Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 1.100 day 510.00 1 day 561.00
904.44
b) Material
Bolts and nuts 20mm dia 70mm long 25.200 kg 123.00 1 kg 3099.60
Rubber insertion 5mm thick 6.160 kg 103.00 1 kg 634.48
White lead
c) Testing
Testing of Pipelines (as per Sub Analysis 2 A) 27.500 rm #REF! 1 rm #REF!
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e+f #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each joint Rs #REF!

f 250 mm dia DI flanged ends 250 mm dia


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36) 0.200 day 648.00 1 day 129.60
Plumber 2nd class ( Labour-Irrigation-S.Skilled- 0.420 day 540.00 1 day 226.80
Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 1.200 day 510.00 1 day 612.00
968.40
b) Material
Bolts and nuts 20mm dia 75mm long 39.600 kg 123.00 1 kg 4870.80
Rubber insertion 5mm thick 8.500 kg 103.00 1 kg 875.50
White lead
c) Testing
Testing of Pipelines with required pressure (as per 27.500 rm #REF! 1 rm #REF!
Sub Analysis
(d) Total 2 A)
= a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e+f #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each joint Rs #REF!

g 300 mm dia DI flanged ends 300 mm dia


a) Labour
447524687.xlsx - data-Road
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Page 1634 of0.240
2191 day 648.00 1 day 155.52
Plumber 2nd class ( Labour-Irrigation-S.Skilled- 0.560 day 540.00 1 day 302.40
Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 1.200 day 510.00 1 day 612.00
1069.92
b) Material
Bolts and nuts 20mm dia 75mm long 39.600 kg 123.00 1 kg 4870.80
Rubber insertion 5mm thick 10.280 kg 103.00 1 kg 1058.84
White lead
c) Testing
Testing of Pipelines with required pressure (as per 27.500 rm #REF! 1 rm #REF!
Sub Analysis
(d) Total 2 A)
= a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e+f #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each joint Rs #REF!

h 350 mm dia DI flanged ends 350 mm dia


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36) 0.300 day 648.00 1 day 194.40
Plumber 2nd class ( Labour-Irrigation-S.Skilled- 0.600 day 540.00 1 day 324.00
Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 1.500 day 510.00 1 day 765.00
1283.40
b) Material
Bolts and nuts 20mm dia 80mm long 54.400 kg 123.00 1 kg 6691.20
Rubber insertion 8mm thick 21.260 kg 103.00 1 kg 2189.78
White lead
c) Testing
Testing of Pipelines with required pressure (as per 27.500 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e+f #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each joint Rs #REF!
i 400 mm dia DI flanged ends 400 mm dia
a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36) 0.300 day 648.00 1 day 194.40
Plumber 2nd class ( Labour-Irrigation-S.Skilled- 0.700 day 540.00 1 day 378.00
Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 1.500 day 510.00 1 day 765.00
1337.40
b) Material
Bolts and nuts 24mm dia 85mm long 98.400 kg 123.00 1 kg 12103.20
Rubber insertion 8mm thick 27.640 kg 103.00 1 kg 2846.92
White lead
c) Testing
Testing of Pipelines (as per Sub Analysis 2 A) 27.500 rm #REF! 1 rm #REF!
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e+f #REF!
(g) Overheads & Contractors Profit 14% #REF!

447524687.xlsx - data-Road
(h) Cost for 10 joints (f+g) Page 1635 of 2191 #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each joint Rs #REF!

j 450 mm dia DI flanged ends 450 mm dia


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36) 0.360 day 648.00 1 day 233.28
Plumber 2nd class ( Labour-Irrigation-S.Skilled- 0.840 day 540.00 1 day 453.60
Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 1.700 day 510.00 1 day 867.00
1553.88
b) Material
Bolts and nuts 24mm dia 85mm long 123.000 kg 123.00 1 kg 15129.00
Rubber insertion 8mm thick 22.660 kg 103.00 1 kg 2333.98
White lead
c) Testing
Testing of Pipelines (as per Sub Analysis 2 A) 27.500 rm #REF! 1 rm #REF!
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e+f #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each joint Rs #REF!

k 500 mm dia DI flanged ends 500 mm dia


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36) 0.390 day 648.00 1 day 252.72
Plumber 2nd class ( Labour-Irrigation-S.Skilled- 0.910 day 540.00 1 day 491.40
Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 1.800 day 510.00 1 day 918.00
1662.12
b) Material
Bolts and nuts 24mm dia 90mm long 134.000 kg 123.00 1 kg 16482.00
Rubber insertion 8mm thick 38.190 kg 103.00 1 kg 3933.57
White lead
c) Testing
Testing of Pipelines with required pressure (as per 27.500 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e+f #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each joint Rs #REF!

l 600 mm dia DI flanged ends 600 mm dia


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36) 0.45 day 648.00 1 day 291.60
Plumber 2nd class ( Labour-Irrigation-S.Skilled- 1.05 day 540.00 1 day 567.00
Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 2.00 day 510.00 1 day 1020.00
1878.60
b) Material
Bolts and nuts 24mm dia 90mm long 192.00 kg 123.00 1 kg 23616.00
Rubber insertion 8mm thick 51.71 kg 103.00 1 kg 5326.13
White lead

447524687.xlsx - data-Road
c) Testing Page 1636 of 2191
Testing of Pipelines (as per Sub Analysis 2 A) 27.50 rm #REF! 1 rm #REF!
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e+f #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each joint Rs #REF!

m 700 mm dia DI flanged ends 700 mm dia


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36) 0.51 day 648.00 1 day 330.48
Plumber 2nd class ( Labour-Irrigation-S.Skilled- 1.19 day 540.00 1 day 642.60
Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 2.20 day 510.00 1 day 1122.00
2095.08
b) Material
Bolts and nuts 24mm dia 90mm long 244.80 kg 123.00 1 kg 30110.40
Rubber insertion 8mm thick 68.91 kg 103.00 1 kg 7097.73
White lead
c) Testing
Testing of Pipelines (as per Sub Analysis 2 A) 27.500 rm #REF! 1 rm #REF!
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e+f #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each joint Rs #REF!

n 750 mm dia DI flanged ends 750 mm dia


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36) 0.510 day 648.00 1 day 330.48
Plumber 2nd class ( Labour-Irrigation-S.Skilled- 1.190 day 540.00 1 day 642.60
Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 2.200 day 510.00 1 day 1122.00
2095.08
b) Material
Bolts and nuts 24mm dia 90mm long 260.400 kg 123.00 1 kg 32029.20
Rubber insertion 8mm thick 78.430 kg 103.00 1 kg 8078.29
White lead
c) Testing
Testing of Pipelines with required pressure (as per 27.500 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e+f #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each joint Rs #REF!

o 800 mm dia DI flanged ends 800 mm dia


Basic rate as per SSR item No.10 - Pg -3 1 No #REF! 1 No #REF!
Overheads & Contractors Profit 14% #REF!
Rate per each joint #REF!

447524687.xlsx - data-Road
VAT & Labour cess. 0%
Page 1637 of 2191 #REF!
Rate per each joint Rs #REF!

p 900 mm dia DI flanged ends 900 mm dia


Basic rate as per SSR item No.10 - Pg - 3 1 No #REF! 1 No #REF!
Overheads & Contractors Profit 14% #REF!
Rate per each joint #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!

q 1000 mm dia DI flanged ends 1000 mm dia


Basic rate as per SSR item No.10 - Pg - 3 1 No #REF! 1 No #REF!
Overheads & Contractors Profit 14% #REF!
Rate per each joint #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!

r 1100 mm dia DI flanged ends 1100 mm dia


Basic rate as per SSR item No.10 - Pg - 3 1 No #REF! 1 No #REF!
Overheads & Contractors Profit 14% #REF!
Rate per each joint #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!

s 1200 mm dia DI flanged ends 1200 mm dia


Basic rate as per SSR item No.10 - Pg - 3 1 No #REF! 1 No #REF!
Overheads & Contractors Profit 14% #REF!
Rate per each joint #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!

28 BMW-G.01: Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer
approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet &
outlets and over flow pipes but without fittings & base support for tanks
Rate as per BMW-G.01 Sn.335 of 2014-15 -B. SSR 1.00 Lit #REF! 1 Kg #REF!
labour charges-BMW-G.02, S.n.336-B.SSR 20% #REF! #REF!
Total #REF!
Overheads & Contractors Profit 14% #REF!
Total #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Lit Rs #REF!

29 PHE-CCIP-23 : Cutting C.I./ DI Pipes without water in mains where ever required (.Dia of pipes in mm.)
Details of cost for one cutting
a Cutting C.I./ DI Pipe -80 mm dia
(a) Labour
Asst. Fitter / Plumber 2nd class 0.060 day 540.00 1 day 32.40
Man mazdoor 0.060 day 510.00 1 day 30.60
63.00
(b) Overheads & Contractors Profit 14% 8.58
Rate per each m 71.58
VAT & Labour cess. 0% 0.00
Rate per each cut Rs 71.58

b Cutting C.I./ DI Pipe -100 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class 0.080 day 540.00 1 day 43.20
Man mazdoor 0.080 day 510.00 1 day 40.80
84.00
(b) Overheads & Contractors Profit 14% 11.44
Rate per each m 95.44
VAT & Labour cess. 0% 0.00
447524687.xlsx - data-Road
Rate per each cut
Page 1638 of 2191 Rs 95.44

c Cutting C.I./ DI Pipe -125 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class 0.110 day 540.00 1 day 59.40
Man mazdoor 0.110 day 510.00 1 day 56.10
115.50
(b) Overheads & Contractors Profit 14% 15.73
Rate per each m 131.23
VAT & Labour cess. 0% 0.00
Rate per each cut Rs 131.23

d Cutting C.I./ DI Pipe -150 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class 0.150 day 540.00 1 day 81.00
Man mazdoor 0.150 day 510.00 1 day 76.50
157.50
(b) Overheads & Contractors Profit 14% 21.44
Rate per each m 178.94
VAT & Labour cess. 0% 0.00
Rate per each cut Rs 178.94

f Cutting C.I./ DI Pipe -200 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class 0.200 day 540.00 1 day 108.00
Man mazdoor 0.200 day 510.00 1 day 102.00
210.00
(b) Overheads & Contractors Profit 14% 28.59
Rate per each m 238.59
VAT & Labour cess. 0% 0.00
Rate per each cut Rs 238.59

g Cutting C.I./ DI Pipe - 250 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class 0.250 day 540.00 1 day 135.00
Man mazdoor 0.250 day 510.00 1 day 127.50
262.50
(b) Overheads & Contractors Profit 14% 35.74
Rate per each m 298.24
VAT & Labour cess. 0% 0.00
Rate per each cut Rs 298.24

h Cutting C.I./ DI Pipe - 300 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class 0.300 day 540.00 1 day 162.00
Man mazdoor 0.300 day 510.00 1 day 153.00
315.00
(b) Overheads & Contractors Profit 14% 42.89
Rate per each m 357.89
VAT & Labour cess. 0% 0.00
Rate per each cut Rs 357.89

i Cutting C.I./ DI Pipe - 350 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class 0.350 day 540.00 1 day 189.00
Man mazdoor 0.350 day 510.00 1 day 178.50
367.50
(b) Overheads & Contractors Profit 14% 50.04
Rate per each m 417.54
VAT & Labour cess. 0% 0.00
Rate per each cut Rs 417.54

447524687.xlsx - data-Road
j Cutting C.I./ DI Pipe - 400 mm dia Page 1639 of 2191
(a) Labour
Asst. Fitter / Plumber 2nd class 0.400 day 540.00 1 day 216.00
Man mazdoor 0.400 day 510.00 1 day 204.00
420.00
(b) Overheads & Contractors Profit 14% 57.18
Rate per each m 477.18
VAT & Labour cess. 0% 0.00
Rate per each cut Rs 477.18

k Cutting C.I./ DI Pipe - 450 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class 0.450 day 540.00 1 day 243.00
Man mazdoor 0.450 day 510.00 1 day 229.50
472.50
(b) Overheads & Contractors Profit 14% 64.33
Rate per each m 536.83
VAT & Labour cess. 0% 0.00
Rate per each cut Rs 536.83

l Cutting C.I./ DI Pipe - 500 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class 0.500 day 540.00 1 day 270.00
Man mazdoor 0.500 day 510.00 1 day 255.00
525.00
(b) Overheads & Contractors Profit 14% 71.48
Rate per each m 596.48
VAT & Labour cess. 0% 0.00
Rate per each cut Rs 596.48

m Cutting C.I./ DI Pipe - 600 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class 0.600 day 540.00 1 day 324.00
Man mazdoor 0.600 day 510.00 1 day 306.00
630.00
(b) Overheads & Contractors Profit 14% 85.77
Rate per each m 715.77
VAT & Labour cess. 0% 0.00
Rate per each cut Rs 715.77

n Cutting C.I./ DI Pipe - 700 mm dia


Rate as per PH SSR S.No.22, Pg.5 & 6 1 No #REF! 1 No #REF!
(b) Overheads & Contractors Profit 14% #REF!
Rate per each m #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!

o Cutting C.I./ DI Pipe - 750 mm dia


Rate as per PH SSR S.No.22, Pg.5 & 6 1 No #REF! 1 No #REF!
(b) Overheads & Contractors Profit 14% #REF!
Rate per each m #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!

p Cutting C.I./ DI Pipe - 800 mm dia


Rate as per PH SSR S.No.22, Pg.5 & 6 1 No #REF! 1 No #REF!
(b) Overheads & Contractors Profit 14% #REF!
Rate per each m #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!

q Cutting C.I./ DI Pipe - 900 mm dia


Rate as per PH SSR S.No.22, Pg.5 & 6 1 No #REF! 1 No #REF!
447524687.xlsx - data-Road
(b) Overheads & Contractors Profit 14%
Page 1640 of 2191 #REF!
Rate per each m #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!

r Cutting C.I./ DI Pipe - 1000 mm dia


Rate as per PH SSR S.No.22, Pg.5 & 6 1 No #REF! 1 No #REF!
(b) Overheads & Contractors Profit 14% #REF!
Rate per each m #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!

s Cutting C.I./ DI Pipe - 1100 mm dia


Rate as per PH SSR S.No.22, Pg.5 & 6 1 No #REF! 1 No #REF!
(b) Overheads & Contractors Profit 14% #REF!
Rate per each m #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!

t Cutting C.I./ DI Pipe - 1200 mm dia


Rate as per PH SSR S.No.22, Pg.5 & 6 1 No #REF! 1 No #REF!
(b) Overheads & Contractors Profit 14% #REF!
Rate per each m #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!

30 Railway crossing/Road crossing/Canal crossing by adopting trenchless technology tunneling work through
specialized pipe jacking method by erecting the equipment to true to the alignment and gradient, by hydraulic pipe
jacking technique complete including tunneling, excavation in all types of soils including hard rock and construction of
RCC chambers suitable to casing pipe pits, and conveyance charges of machinery and other required materials but
excluding cost of encasing pipe, in co-ordination with the concerned authorities as per approved drawings and
directed by the Engineer-in – Charge.

a 800 mm dia
Basic Rate as per table.33 of PH SSR 1 Rmt 26000.00 1 Rmt 26000.00
Cost of 800 mm dia MS pipe-10mm thick 1 Rmt 19113.12 1 Rmt 19113.12
45113.12
Overheads & Contractors Profit 14% 6142.15
51255.27
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt 51255.27

b 900 mm dia
Basic Rate as per table.33 of PH SSR 1 Rmt 27300.00 1 Rmt 27300.00
Cost of 900 mm dia MS pipe-10mm thick 1 Rmt 21355.70 1 Rmt 21355.70
48655.70
Overheads & Contractors Profit 14% 6624.47
55280.17
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt 55280.17

c 1000 mm dia
Basic Rate as per table.33 of PH SSR 1 Rmt 28600.00 1 Rmt 28600.00
Cost of 1000 mm dia MS pipe-10mm thick 1 Rmt 23917.46 1 Rmt 23917.46
52517.46
Overheads & Contractors Profit 14% 7150.25
59667.71
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt 59667.71

d 1100 mm dia
Basic Rate as per table.33 of PH SSR 1 Rmt 29900.00 1 Rmt 29900.00
Cost of 1100 mm dia MS pipe-10mm thick 1 Rmt 27901.65 1 Rmt 27901.65
447524687.xlsx - data-Road
Page 1641 of 2191 57801.65
Overheads & Contractors Profit 14% 7869.69
65671.34
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt 65671.34

e 1200 mm dia
Basic Rate as per table.33 of PH SSR 1 Rmt 31200.00 1 Rmt 31200.00
Cost of 1200 mm dia MS pipe-10mm thick 1 Rmt 31361.23 1 Rmt 31361.23
62561.23
Overheads & Contractors Profit 14% 8517.71
71078.94
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt 71078.94

f 1300 mm dia
Basic Rate as per table.33 of PH SSR 1 Rmt 32500.00 1 Rmt 32500.00
Cost of 1300 mm dia MS pipe-10mm thick 1 Rmt 34182.37 1 Rmt 34182.37
66682.37
Overheads & Contractors Profit 14% 9078.80
75761.17
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt 75761.17

g 1400 mm dia
Basic Rate as per table.33 of PH SSR 1 Rmt 35100.00 1 Rmt 35100.00
Cost of 1400 mm dia MS pipe-10mm thick 1 Rmt 36421.42 1 Rmt 36421.42
71521.42
Overheads & Contractors Profit 14% 9737.64
81259.06
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt 81259.06

g 1500 mm dia
Basic Rate as per table.33 of PH SSR 1 Rmt 39000.00 1 Rmt 39000.00
Cost of 1500 mm dia MS pipe-10mm thick 1 Rmt 38990.24 1 Rmt 38990.24
77990.24
Overheads & Contractors Profit 14% 10618.37
88608.61
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt 88608.61

OBSERVED DATA
31 Providing, Laying & Jointing of the following DI pipes of K7 class as per ISI with spigot and socket ends, with all
necessary fittings as per IS 3114, including cost of DI pipes and specials and rubber rings, lowering, laying, jointing
and testing to required pressure including cost and conveyance of all materials to the site, labour charges etc., etc.
complete. ( Rates are inclusive of CP & OH )
a 100mm dia.DI K7 class (per Rmt)
Basic rate of DI pipe as per separate sheet 1 Rmt 1234.31 1 Rmt 1234.31
Cost of Rubber gasket ( Rate/5.50Rmt) 0.18 No 128.73 1 No 23.43
Lowering Charges as per data-34.b 1 Rmt 41.93 1 Rmt 41.93
Jointing charges ( Rate/5.50 Rmt) 0.18 No #REF! 1 No #REF!
Total #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!

b 150mm dia.DI K7 (per Rmt)


Basic rate of DI pipe as per separate sheet 1 Rmt 1715.51 1 Rmt 1715.51
Cost of Rubber gasket ( Rate/5.50Rmt) 0.18 No 187.84 1 No 34.19
Lowering Charges as per data . 34 1 Rmt 68.29 1 Rmt 68.29
Jointing charges ( Rate/5.50 Rmt) 0.18 No #REF! 1 No #REF!
Total #REF!

447524687.xlsx - data-Road
VAT & Labour cess. 0%
Page 1642 of 2191 #REF!
Rate per 1 Rmt Rs #REF!

c 200mm dia.DI K7 (per Rmt)


Basic rate of DI pipe as per separate sheet 1 Rmt 2368.37 1 Rmt 2368.37
Cost of Rubber gasket ( Rate/5.50Rmt) 0.18 No 228.57 1 No 41.60
Lowering Charges as per data . 34 1 Rmt 99.29 1 Rmt 99.29
Jointing charges ( Rate/5.50 Rmt) 0.18 No #REF! 1 No #REF!
Total #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!

d 250mm dia.DI K7 (per Rmt)


Basic rate of DI pipe as per separate sheet 1 Rmt 3174.02 1 Rmt 3174.02
Cost of Rubber gasket ( Rate/5.50Rmt) 0.18 No 254.84 1 No 46.38
Lowering Charges as per data . 34 1 Rmt 134.14 1 Rmt 134.14
Jointing charges ( Rate/5.50 Rmt) 0.18 No #REF! 1 No #REF!
Total #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!

e 300mm dia.DI K7 (per Rmt)


Basic rate of DI pipe as per separate sheet 1 Rmt 4093.07 1 Rmt 4093.07
Cost of Rubber gasket ( Rate/5.50Rmt) 0.18 No 387.51 1 No 70.53
Lowering Charges as per data . 34 1 Rmt 173.50 1 Rmt 173.50
Jointing charges ( Rate/5.50 Rmt) 0.18 No #REF! 1 No #REF!
Total #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!

f 350mm dia.DI K7 (per Rmt)


Basic rate of DI pipe as per separate sheet 1 Rmt 5139.11 1 Rmt 5139.11
Cost of Rubber gasket ( Rate/5.50Rmt) 0.18 No 491.29 1 No 89.41
Lowering Charges as per data . 34 1 Rmt 217.61 1 Rmt 217.61
Jointing charges ( Rate/5.50 Rmt) 0.18 No #REF! 1 No #REF!
Total #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!

g 400mm dia.DI K7 (per Rmt)


Basic rate of DI pipe as per separate sheet 1 Rmt 6225.88 1 Rmt 6225.88
Cost of Rubber gasket ( Rate/5.50Rmt) 0.18 No 535.95 1 No 97.54
Lowering Charges as per data . 34 1 Rmt 265.58 1 Rmt 265.58
Jointing charges ( Rate/5.50 Rmt) 0.18 No #REF! 1 No #REF!
Total #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!

h 500mm dia.DI K7(per Rmt)


Basic rate of DI pipe as per separate sheet 1 Rmt 8932.26 1 Rmt 8932.26
Cost of Rubber gasket ( Rate/5.50Rmt) 0.18 No 576.67 1 No 104.95
Lowering Charges as per data . 34 1 Rmt 321.27 1 Rmt 321.27
Jointing charges ( Rate/5.50 Rmt) 0.18 No #REF! 1 No #REF!
Total #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!

447524687.xlsx - data-Road
32 Observed data based on IRR-CCDW1-8 : Providing and
Page 1643 fixing 1.50 m long 16mm dia cold twisted deformed steel
of 2191
Anchor rods with 0.75m length driven in to the hole drilled in bed rock and remaining length embedded in concrete/
masonry including cost of all materials, machinary, labour, drilling and cleaning hole, driving Anchore rod, grouting
hole with thick cement slurry etc, with intial lead up to 50m and all lifts.
Unit - 10 Nos 16 mm dia
A) MATERIALS
16mm dia Steel (including 5% Wastage) 10 Nos of 23.70 Kg 44.50 1 Kg 1054.65
1.50m length
Drilling of 20mm dia holes by Pneumatic 7.5 Rmt #REF! 1 Rmt #REF!
Compressor Sl No.141 - R & B SSR-2013-14
( 10Nos x 0.75m)
Grouting 20mm dia holes with neat cement slurry 7.5 Rmt #REF! 1 Rmt #REF!
Sl No.144 Pg No. 19 - R & B SSR-2013-14
( 10Nos x 0.75m)
B) LABOUR CHARGES
Bar Bender 0.50 day 678.00 1 day 339.00
Mason 2nd class 0.50 day 540.00 1 day 270.00
Mazdoor (unskilled) 1.00 day 510.00 1 day 510.00
Rate per 10 Nos Rs #REF!
Rate per 1 Nos Rs #REF!
Rate per Each Rs #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 No #REF!

33 Laying of Service lines for facilitating connections to properties including cost and conveyance of all material and all
labour charges etc, complete.
a AC Service Lines - with 100mm dia AC class 15 p Unit 100 m
Rate of AC 100mm dia pipe as per work sheet 100 Rmt #REF! 1 Rmt #REF!
Rate of 100mm dia Coupling for 90% the pipe 23 Nos #REF! 1 Nos #REF!
Length
Rubber ring to suit AC 100mm dia coupling 23 Nos #REF! 1 Nos #REF!
Rate of 100mm dia CID Joints for 10% the pipe 3 No 3.8 Kg #REF! 1 Kg #REF!
Length @ 3.80 Kg/each
Earth work Excavation -100 x 0.5 x1.10 55.00 Cum 132.49 1 Cum 7286.95
Sand / stone dust Bedding : 100 x 0.5 x 0.10 5.00 Cum 732.87 1 Cum 3664.35
Lowering and Jointing Charges 100.00 Rmt 73.70 1 Rmt 7370.00
Rate per 100 Rmt #REF!
Rate per 1 Rmt #REF!
Add for Specials and fittings etc at 2% #REF!
#REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt #REF!

b HDPE Service Line - with 110mm dia -PE.100, 6Kg pipe Unit 100 m
Rate of 110mm OD -HDPE 6 Kg/Sqcm -PE-100 100 Rmt 432.17 1 Rmt 43217.44
pipe as per work sheet
Earth work Excavation -100 x 0.5 x1.10 55.00 Cum 132.49 1 Cum 7286.95
Sand Bedding : 100 x 0.5 x 0.10 5.00 Cum 732.87 1 Cum 3664.35
Lowering and Jointing Charges 100.00 Rmt 68.40 1 Rmt 6840.00
Rate per 100 Rmt 61008.74
Rate per 1 Rmt 610.09
Add for Specials and fittings etc at 2% 12.00
622.09
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt 622.09

* Removal of Telephone/Electric Poles and Lines


RBR-STCL-23: Removal of telephone/electric poles with wires including excavation and dismantling of foundation
concrete and lines under the supervision of concerned department, disposal with all lifts and upto a lead of 1000 m
and stacking the serviceable and unserviceable material separately as per Technical Specification Clause 202
MORD / MORTH.

Unit = each
447524687.xlsx - data-Road
Taking output = 30 Nos. Page 1644 of 2191 30 Nos
a) labour
Mate day 540.00 1 day 0.00
Mazdoor (Unskilled) 10.480 day 510.00 1 day 5344.80
Electrician / Lineman 2.000 day 648.00 1 day 1296.00
b) Machinery
Tractor with trolley 3t 1.500 hour 464.80 1 hour 697.20
7338.00
c&d) Overheads & Contractors Profit 14% 999.07
Cost for 30 poles = a+b+c+d 8337.07
Rate per pole = (a+b+c+d)/30 277.90
VAT & Labour cess. 0% 0.00
Rate per each 277.90

33 Shifting and errection of electric poles, telephone poles coming across the proposed alignment of the pipeline
including cost and conveyance of all material and all labour charges etc,. Complete.
Removal of telephone/electric poles 1 No 277.90 1 No 277.90
PSCC Pole (8.0 m) - 140 Kg WL (as per electrical 1 No 2585.00 1 No 2585.00
cost data (APSEB) for the year 2013-14 under
centralised material for RE and distribution works
vide Pg.1-5, S.N-14)
CC (1:4:8) for foundation (pi x r2 x h ) = 3.14 x (0.30)2 x 0.750.21 Cum Err:509 1 Cum Err:509
CC (1:2:4) for support above GL (pi x r h ) = 3.14
2x
0.10 Cum Err:509 1 Cum Err:509
x (0.25)2 x 0.50
Err:509
Erection charges of Electrical pole LS 337.2
Rate per each Err:509

34 Shifting of under ground cables coming across the proposed alignment of the pipeline including Earth work
excavation, shifting of cables and backfilling etc, complete.
RBR-FNDN-1- (i-B) - EWE In ordinary soils, by 0.3375 Cum 132.49 1 Cum 44.72
Mechanical means per 1 Rmt - 1 x0.45 x 0.75 =
0.3375 cum
Labour charges for shifting the cable and repairs etc LS 13.42
Rate per 1 Rmt 58.14

35 Manufacturing ,Supplying and errection of air valve gaurd cabins of size 0.90 x0.90 x 0.90 m made with 4 nos vertical
and 8 nos horizontal MS flats of size 50x8 mm and 12mm dia MS round bars fixed at 10 cm c/c with door and
locking arrangements as per approved drawing and as directed by the departmental officers and painting both sides
with anti corrossive paint two coats over one coat of primery coat including cost of all materials , fabrication ,welding ,
transportation to site, all taxes and duties,fixing in position duly embodying in CC(1:4:8) prop , and all other
incidental and operational charges etc complete for finished item of work.

MS flats of size 50 x 8mm @39.20Kg/Sqm


Horizontals 8 0.95 0.05 39.20 14.90 Kg
Vericals including 0.45m legs 4 1.40 0.05 39.20 10.98 Kg
12mm dia MS bars at 10cm c/c @ 0.89Kg / Rmt (0.90 / 5 12 0.90 0.89 48.06 Kg
0.075 = 12 Nos)
Painting with synthetic enamyl paint 5 0.90 0.90 4.05 Sqm
Earth work 4 0.45 0.45 0.50 0.41 Cum
CC (1:2:4) 4 0.45 0.45 0.50 0.41 Cum
Abstract
Cost of MS Angles 25.88 Kg 44.50 1 Kg 1151.66
Cost of MS Rods 48.06 Kg 44.50 1 Kg 2138.67
Add fabrication charges - BMM-V.14. Bld SSR-2013-14 73.94 Kg #REF! 1 Kg #REF!

Add Municipal allowence on Labour component 20% #REF!


Painting with synthetic enamyl paint 12.96 Sqm #REF! 1 Sqm #REF!
Earth work 0.41 Cum 210.92 1 Cum 86.48
CC (1:2:4) 0.41 Cum Err:509 1 Cum Err:509
Add for Locking arrangements,Transport , etc. #REF!
#REF!
VAT & Labour cess. 0% #REF!
Total Rs #REF!
447524687.xlsx - data-Road
Page 1645 of 2191
II DATA - SUMPS & SEPTIC TANKS
3 RBR-FNDN-1-A-i -manual means : Earthwork excavation for structures in all types of soils up to 3.00 Mts
depth below GL as per drawing and technical specifications including setting out, construction of shoring and
bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and
bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304
MORTH. for Sumps,Thrust blocks, Chambers and Man Holes etc. by manual means,
Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD and 301.2.1 of MORT&H
Ordinary Soils : for Sumps, Thrust Blocks and Man Holes etc,.
up to 3.00 Mts depth below GL out put 10.00 Cum
a)  Labour
Mate ( Labour- R&B-S.N.71) 0 Nos. 540.00 1 Each 0.00
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 3.64 Nos. 510.00 1 Each 1856.40
Sub total 1856.40
c&d) Overheads & Contractors Profit 13.62% 252.75
Cost for 240 cum = a+b+c+d 2109.15
Rate per cum = (a+b+c+d)/10 210.92
VAT & Labour cess. 0% 0.00
a Rate per 1 Cum excluding Dewatering Rs 210.92
Add extra for Dewatering @ 5% 5% 10.55
b Rate per 1 Cum including Dewatering Rs 221.47

4 RBR-FNDN-1- (I-B-i) - In ordinary soils up to 3.00 Mts depth below GL by Mechanical means: Earthwork
excavation in all kinds of soils as per drawing and technical specifications including setting out, construction of
shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of
sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305
MORD / 304 MORTH. for Sumps,Thrust blocks, Chambers and Man Holes etc. by mechanical means.

In ordinary soils by Mechanical means for Pipe line trenches


up to 3.00 Mts depth below GL out put 240.0 Cum
a) Labour
Mate ( Labour- R&B-S.N.71) 0 Nos. 540.00 1 Each 0.00
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 8.32 Nos. 510.00 1 Each 4243.20
b) Machinery
Hydraulic Excavator - (Hire charges R & B- S.N.4) 6.00 hours 2967.90 1 hours 17807.40
Sub total 22050.60
c&d) Overheads & Contractors Profit 14% 3002.19
Cost for 240 cum = a+b+c+d 25052.79
Rate per cum = (a+b+c+d)/240 104.39
VAT & Labour cess. 0% 0.00
a Rate per 1 Cum excluding Dewatering Rs 104.39
Add extra for Dewatering @ 5% 5% 5.22
b Rate per 1 Cum including Dewatering Rs 109.61

5 RBR-FNDN-1- (III) - Hard rock (require blasting) -up to 3.00Mts. below GL: Excavation in Hard rockas per
drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps
and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in
trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH. for
Sumps,Thrust blocks, Chambers and Man Holes etc. by mechanical means. .
Upto 3 m depth including 1.5 m depth in hard rock
up to 3.00 Mts depth below GL out put 10.0 Cum
a)  Labour
Mate ( Labour- R&B-S.N.71)
Driller ( Labour - R&B- Sn.31) 0.50 Nos. 660.00 1 Each 330.00
Blaster ( Labour-Irrigation-Skilled-Sn.3) 0.25 Nos. 678.00 1 Each 169.50
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 8.35 Nos. 510.00 1 Each 4258.50
b) Machinery
Air compressor 210 cfm / 250 cfm with 2 jack hammers 1.00 hours 1358.70 1 hours 1358.70
for drilling at 15 cum per hour (Hire-Irri-Sn.3)
c) Materials
Gelatin 80%, (Pg 30 of Irrigation items - M - 104 ) 3.50 No #REF! 1 No #REF!

447524687.xlsx - data-Road
Detonator electric, (Pg 29 of Irrigation SoR - MPage
- 1646 of14.00
2191 Nos #REF! 100 Nos #REF!
094) Sub total #REF!
c&d) Overheads & Contractors Profit 14% #REF!
Cost for 240 cum = a+b+c+d #REF!
Rate per cum = (a+b+c+d)/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Cum excluding Dewatering Rs #REF!

6 RBR-EECD-9 -ii-B : :Excavation in hard rock (blasting prohibited) with rock breakers including breaking rock, loading
in tippers and disposal with initial lift of 3 mts and lead upto 1000 metres, trimming bottom and side slopes in
accordance with requirements of lines, grades and cross- sections as per Technical Specification Clause 302.3.5
MORD / 301 MORTH , by Machanical means for Sumps, Thrust Blocks and Man Holes etc,.

out put 36.00 Cum


a)  Labour
Mate ( Labour- R&B-S.N.71) 0.000 day 540.00 1 day 0.00
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 10.400 day 510.00 1 day 5304.00
b) Machinery
Hydraulic excavator 0.9 cum with rock breaker 6.000 hour 2967.90 1 hour 17807.40
attachment @ 6 cum per hour
Tipper 5.5 cum-1 trip per hour ( R&B-Hire-Sn.6) 6.50 hour 924.10 1 hour 6006.65
Credit for excavated rock found suitable for use @ -18.00 cum #REF! 1 cum #REF!
50 per cent of excavated quantity -M-089-Pg.29 -
Irri SSR
Total #REF!
d) Overheads & Contractors Profit 14% #REF!
#REF!
Rate per cum = a+b+c+d+e)/36 #REF!
VAT & labour cess 0% #REF!
Rate per 1 Cum excluding Dewatering #REF!

7 BLD-CSTN-2-8 (16) : Collection ,Supply and filling of Sand from approved quarry to work site and stacking at work
site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour charges etc.
complete as per standard specifications. Clause 305.3.9 MORD & 304 MORTH
Sand Filling out put 6.00 Cum
a) Material
Sand (C-Mat-Lead statement-S.No.1) 6.00 Cum 1303.00 1 Cum 7818.00
b)  Labour
Mate ( Labour- R&B-S.N.71) 0.00 Nos 540.00 1 Nos 0.00
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 0.31 Nos 510.00 1 Nos 158.10
Sub Total 7976.10
b&c) Overheads & Contractors Profit 14% 1085.95
Cost for 6 cum = a+b+c 9062.05
Rate per cum = (a+b+c)/6 1510.34
VAT & Labour cess. 0% 0.00
Rate per 1 Cum 1510.34

8 BLD-CSTN-3-7-Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:5:10)
prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including
cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on
all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the
required level curing etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:
Cement (ENC-PH.Memo.No.146/Cement & Steel / 129.60 Kg 4.600 1 Kg 596.16
T1
Coarse aggregate 40mm graded ( C-Mat- S.No-57) 0.90 Cum Err:509 1 Cum Err:509
Fine aggregate (Sand) ( C-Mat-S.N.2 ) 0.45 Cum 1303.00 1 Cum 586.35
Water (including for curing) -M-189-b. irrigation 1.20 Kl 98.00 1 Kl 117.60
SSR
B. MACHINERY

447524687.xlsx - data-Road
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity
Page 1647 of 21911 hour 397.50 1 hour 397.50
(Hire charges-Irrigation-
C. LABOUR: S.N.16)
Mason 1st class (labour-Irrigation.S.N.11) 0.10 Nos 564.00 1 Nos 56.40
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 1.39 Nos 510.00 1 Nos 708.90
Sub- Total Rs Err:509
d) Overheads & Contractors Profit 14% Err:509
Rate per cu.m. Rs Err:509
VAT & labour cess 0% Err:509
Rate per 1 Cum Err:509

9 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix
(1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage
charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top
surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:
Cement-(ENC-PH.Memo.No.146/Cement&Steel / 162.00 Kg 4.60 1 Kg 745.20
T1
Coarse aggregate 40mm graded ( C-Mat- S.No-57) 0.90 Cum 799.95 1 Cum 719.96
Fine aggregate (Sand) ( C-Mat-S.N.2 ) 0.45 Cum 1303.00 1 Cum 586.35
Water (including for curing) -M-189-b. irrigation 1.20 Kl 98.00 1 Kl 117.60
SSR
B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity 1 hour 397.50 1 hour 397.50
(Hire charges-Irrigation- S.N.16)
C. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11) 0.10 Nos 564.00 1 Nos 56.40
Man mazdoor 1.39 Nos 510.00 1 Nos 708.90
Grand Total Rs 3331.91
Overheads & Contractors Profit 14% 453.64
Rate per cu.m. Rs 3785.55
VAT & Labour cess. 0% 0.00
Rate per 1 Cum Rs 3785.55

10 BLD-CSTN-3-10- ( 27 ) Hand mixing : Plain Cement concrete nominal mix (1:3:6) prop (Cement : fine aggregate:
coarse aggregate ) using 20mm size Hard Granite Machine Crushed Metal including cost and conveyance of all
materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing
etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:
Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1 220.00 Kg 4.60 1 Kg 1012.00
Coarse aggregate 20mm graded (C-Mat-Sn.48) 0.90 Cum Err:509 1 Cum Err:509
Fine aggregate (Sand) 0.45 Cum 1303.00 1 Cum 586.35
Water (including for curing) 1.20 Kl 98.00 1 Kl 117.60
B. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11) 0.10 day 564.00 1 day 56.40
Man mazdoor 2.36 day 510.00 1 day 1203.60
Sub - Total Rs Err:509
c.Overheads & Contractors Profit 14% Err:509
Rate per cu.m. Rs Err:509
VAT & Labour cess. 0% Err:509
Rate per 1 Cum Rs Err:509

447524687.xlsx - data-Road
3 BLD-CSTN-3-14-(31)-A: Supply and placing of Page the1648
M-30 Design Mix Concrete corresponding to IS 456 using
of 2191
WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from
approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement
content as per IS code . for FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth)

M-30 GRADE OF MIX


Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1 400.00 Kg 4.60 1 Kg 1840.00
20mm HBG graded metal ( C-Mat- Sn.49) 0.800 Cum 1406.20 1 Cum 1124.96
Sand (C-Mat-Lead statement-S.No.1) 0.400 Cum 1303.00 1 Cum 521.20
Mason 1st class (labour-Irri-Skilled .S.N.11) 0.133 Nos. 564.00 1 Each 75.01
2nd Class Mason (labour-Irri-Semi skilled.S.N.35) 0.267 Nos. 540.00 1 Each 144.18
Mazdoor (irri-Un skilled-Sn.3) 4.600 Nos. 510.00 1 Each 2346.00
Weigh Batcher Hire charges (Batching Plant) Sn.9 1.333 hour 608.10 1 hour 810.60
Vibrator hire charges ( Hire charges-irrigation. 1.333 hour 205.00 1 hour 273.27
Sn.41)
Water (including for curing) -M-189-b. irrigation 1.20 Kl 98.00 1 Kl 117.60
SSR BASIC COST per 1 cum Rs 7252.82

a Base slab and Haunches and Toe


R.C.C. M 30 Per Cum 1.00 Cum 7252.82 1 Cum 7252.82
Centering charges ,Pg No.84 to 89 1.00 Cum 152.00 1 Cum 152.00
Labour charges,Pg No..84 to 89 1.00 Cum 127.00 1 Cum 127.00
Add Labour component @ 20%
7531.82
Overheads & Contractors Profit 13.615% 1025.46
Total 8557.28
VAT & labour cess 0% 0.00
Rate per One Cum Rs 8557.28

4 BLD-CSTN-3-14-(31)-B: Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using
WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from
approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement
content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS

RCC - M-30 Grade of Mix


Cement-(ENC-PH.Memo.No.146/Cement&Steel / 400.00 Kg 4.60 1 Kg 1840.00
T1
20mm HBG graded metal ( C-Mat- Sn.49) 0.800 Cum 1406.20 1 Cum 1124.96
Sand (C-Mat-Lead statement-S.No.1) 0.400 Cum 1303.00 1 Cum 521.20
Mason 1st class (labour-Irri-Skilled .S.N.11) 0.167 Nos. 564.00 1 Each 94.19
2nd Class Mason (labour-Irri-Semi skilled.S.N.35) 0.167 Nos. 540.00 1 Each 90.18
Mazdoor (irri-Un skilled-Sn.3) 5.600 Nos. 510.00 1 Each 2856.00
Weigh Batcher Hire charges (Batching Plant) Sn.9 1.333 hour 608.10 1 hour 810.60

Vibrator hire charges ( Hire charges-irrigation. 1.333 hour 205.00 1 hour 273.27
Sn.41)
Water (including for curing) -M-189-b. irrigation 1.20 Kl 98.00 1 Kl 117.60
SSR
BASIC COST per 1 cum Rs 7728.00
Columns up to 3.66 Mts unsupported height above GL
RCC - M-30 Grade of Mix 1.00 Cum 7728.00 1 Cum 7728.00
Material charges for Centering & Scaffolding, Pg 1.00 Cum 355.00 1 Cum 355.00
No.84 to 89 (Steel scaffolding)
Labour charges for Centering & Scaffolding,Pg 1.00 Cum 2268.00 1 Cum 2268.00
No.84 to 89
Add Labour component @ 20% 453.60
Basic Cost Rs 10804.60
Overheads & Contractors Profit 13.615% 1471.05
447524687.xlsx - data-Road
Page 1649 of 2191 12275.65
VAT & labour cess 0% 0.00
Rate per One Cum Rs 12275.65

A RCC Walls of Height up to 3.00 Mts un supported Height


i Vertical walls of plane surface
a Plain walls up to 3.00m height & thickness of 300 mm

RCC - M-30 Grade of Mix 1.00 Cum 7728.00 1 Cum 7728.00


Centering charges for RCC vertical walls of plain 3.33 Sqm 1063.00 1 Sqm 3539.79
surface up to 3 m height. Pg-7 of PH SoR-2014-15

Rs 11267.79
Overheads & Contractors Profit 13.615% 1534.11
Total 12801.90
VAT & labour cess 0% 0.00
Rate per One Cum Rs 12801.90

Vertical walls of plane surface


b Plain walls up to 3.00m height & thickness of 200 mm

BASIC COST per 1 cum 1.00 Cum 7728.00 1 Cum 7728.00


Centering charges for RCC vertical walls of plain 5.00 Sqm 1063.00 1 Sqm 5315.00
surface up to 3 m height. Pg-7 of PH SoR-2014-15

Rs 13043.00
Overheads & Contractors Profit 13.615% 1775.8
Total 14818.80
VAT & labour cess 0% 0.00
Rate per One Cum Rs 14818.80

ii Vertical walls of circular faces


Circular walls up to 3.00m Height & Thickness
a 175 mm
of
RCC - M-30 Grade of Mix 1.00 Cum 7728.00 1 Cum 7728.00
Centering charges for RCC vertical walls of circular 5.71 Sqm 1352.00 1 Sqm 7719.92
faces up to 3 m height. Pg-7 of PH SoR-2014-15
Rs 15447.92
Overheads & Contractors Profit 13.615% 2103.23
Total 17551.15
VAT & labour cess 0% 0.00
Rate per One Cum Rs 17551.15

Circular walls up to 3.00m Height & Thickness 180 mm


b
of

RCC - M-30 Grade of Mix 1.00 Cum 7728.00 1 Cum 7728.00


Centering charges for RCC vertical walls of circular 5.56 Sqm 1352.00 1 Sqm 7517.12
faces up to 3 m height. Pg-7 of PH SoR-2014-15

Rs 15245.12
Overheads & Contractors Profit 13.615% 2075.62
Total 17320.74
VAT & labour cess 0% 0.00
Rate per One Cum Rs 17320.74

c Circular walls up to 3.00m Height & Thickness 225 mm


of
RCC - M-30 Grade of Mix 1.00 Cum 7728.00 1 Cum 7728.00
Centering charges for RCC vertical walls of circular 4.44 Sqm 1352.00 1 Sqm 6002.88
faces up to 3 m height. Pg-7 of PH SoR-2014-15

447524687.xlsx - data-Road
Page 1650 of 2191 Rs 13730.88
Overheads & Contractors Profit 13.615% 1869.46
Total 15600.34
VAT & labour cess 0% 0.00
Rate per One Cum Rs 15600.34

d Circular walls up to 3.00m Height & Thickness 250 mm


of
RCC - M-30 Grade of Mix 1.00 Cum 7728.00 1 Cum 7728.00
Centering charges for RCC vertical walls of circular 4.00 Sqm 1352.00 1 Sqm 5408.00
faces up to 3 m height. Pg-7 of PH SoR-2014-15

Rs 13136.00
Overheads & Contractors Profit 13.615% 1788.47
Total 14924.47
VAT & labour cess 0% 0.00
Rate per One Cum Rs 14924.47

5 BLD-CSTN-3-14-(31)-C : Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using
WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from
approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement
content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering,
laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item
of work. for RCC SLABS, BEAMS

RCC - M-30 Grade of Mix


Cement-(ENC-PH.Memo.No.146/Cement&Steel / 400.00 Kg 4.60 1 Kg 1840.00
T1
20mm HBG graded metal ( C-Mat- Sn.49) 0.800 Cum 1406.20 1 Cum 1124.96
Sand (C-Mat-Lead statement-S.No.1) 0.400 Cum 1303.00 1 Cum 521.20
Mason 1st class (labour-Irri-Skilled .S.N.11) 0.067 No 564.00 1 No 37.79
2nd Class Mason (labour-Irri-Semi skilled.S.N.35) 0.133 No 540.00 1 No 71.82
Mazdoor (irri-Un skilled-Sn.3) 3.077 No 510.00 1 No 1569.27
Weigh Batcher Hire charges (Batching Plant) Sn.9 0.308 hour 608.10 1 hour 187.29
Vibrator hire charges ( Hire charges-irrigation. 0.308 hour 205.00 1 hour 63.14
Sn.41)
Water (including for curing) -M-189-b. irrigation 1.200 Kl 98.00 1 Kl 117.60
SSR
BASIC COST per 1 cum Rs 5533.07

i RCC Slabs
A RCC M 30 Slabs up to 3.66 Mts height
RCC M 30 Slabs up to 3.66m Height &
a 100 mm
Thickness of
Cost of M- 30 grade mix 1.00 Cum 5533.07 1 Cum 5533.07
Centering charges ,Pg No.84 to 89 10.00 Sqm 236.00 1 Sqm 2360.00
Labour charges,Pg No.84 to 89 10.00 Sqm 215.00 1 Sqm 2150.00
Add Labour component @ 20% 430.00
Rs 10473.07
Overheads & Contractors Profit 13.615% 1425.91
Total 11898.98
VAT & labour cess 0% 0.00
Rate per One Cum Rs 11898.98

RCC M 30 Slabs up to 3.66m Height &


b 125 mm
Thickness of
Cost of M- 30 grade mix 1.00 Cum 5533.07 1 Cum 5533.07
Centering charges ,Pg No.84 to 89 8.00 Sqmt. 227.00 1 Sqmt. 1816.00
Labour charges,Pg No.84 to 89 8.00 Sqm 162.00 1 Sqm 1296.00
Add Labour component @ 20% 259.20
Rs 8904.27
447524687.xlsx - data-Road
Overheads & Contractors Profit 13.615%
Page 1651 of 2191 1212.32
Total 10116.59
VAT & labour cess 0% 0.00
Rate per One Cum Rs 10116.59

II RCC Dome Slab


a RCC M 30 Dome Slab up to 3.66m Height
Cost of M- 30 grade mix 1.00 Cum 5533.07 1 Cum 5533.07
Centering charges ,Pg No.84 to 89 1.00 Cum 3833.00 1 Cum 3833.00
Labour charges,Pg No.84 to 89 1.00 Cum 3496.00 1 Sqm 3496.00
Add Labour component @ 20% 699.20
Rs 13561.27
Overheads & Contractors Profit 13.615% 1846.37
Total 15407.64
VAT & labour cess 0% 0.00
Rate per One Cum Rs 15407.64

b RCC M 30 Dome Slab up to 7.32m Height


Cost of M- 30 grade mix 1.00 Cum 5533.07 1 Cum 5533.07
Centering charges ,Pg No.84 to 89 1.00 Cum Err:509 1 Cum Err:509
Labour charges,Pg No.84 to 89 1.00 Cum Err:509 1 Sqm Err:509
Add Labour component @ 20% Err:509
Rs Err:509
Overheads & Contractors Profit 13.615% Err:509
Total Err:509
VAT & labour cess 0% Err:509
Rate per One Cum Rs Err:509

III RCC Beams


A RCC M 30 Beams up to 3.66m Height
Cost of M- 30 grade mix 1.00 Cum 5533.07 1 Cum 5533.07
Centering charges ,Pg No.84 to 89 1.00 Cum 1342.00 1 Sqm 1342.00
Labour charges,Pg No.84 to 89 1.00 Cum 1122.00 1 Sqm 1122.00
Add Labour component @ 20% 224.40
Rs 8221.47
Overheads & Contractors Profit 13.615% 1119.35
Total 9340.82
VAT & labour cess 0% 0.00
Rate per One Cum Rs 9340.82

B RCC M 30 Beams up to 7.32m Height


Cost of M- 30 grade mix 1.00 Cum 5533.07 1 Cum 5533.07
Centering charges ,Pg No.84 to 89 1.00 Cum Err:509 1 Sqm Err:509
Labour charges,Pg No.84 to 89 1.00 Cum Err:509 1 Sqm Err:509
Add Labour component @ 20% Err:509
Rs Err:509
Overheads & Contractors Profit 13.615% Err:509
Total Err:509
VAT & labour cess 0% Err:509
Rate per One Cum Rs Err:509

6 Suply, delivery and fixing of C.I. heavy weight manhole frame and cover in the roof slab incuding labour charges for
fixing and all incidental and operational charges as directed by the Engineer in Charge..
Weight of C.I. heavy weight manhole frame and 1 Kg 103.820 1 Kg 103.82
cover 90 Kg each( 2 x 90 ) = 180 Kg- rate as per CI
specials vide This data book
Total Rs 103.82
Overheads & Contractors Profit 14% 14.14
Total 117.96
447524687.xlsx - data-Road
VAT & labour cess 0%
Page 1652 of 2191 0.00
Cost of Man hole frame in Kg Rs 117.96

7 Manufacturing, supply and erection of 600 mm width ladders with 50X50X6 mm MS angles 2 nos verticals and
horizontals fixed at 25 cm c/c as per aprooved drawing and as directed by the departmental officers and painting
both sides with anti corrosive paint two coats over one coat of primary coat including cost of all materials fabrication,
welding transportation to site, all taxex and duties, fixing in position duly embodying in CC (1:1.5:3) prop., and all
other incidental and operational charges etc., complete for finished item of work.
Cost of ladder of 4.0 m
Weight of 50x50x6mm MS channels =(14.50 Rmt x 61.05 kg
4.42 kg/Rmt =
total 61.05 kg

Cost of MS channels ( Rate of steel as per ENC- 61.05 kg 44.50 1 kg 2716.73


(PH),memo )
fabrication charges, Item-BMM-V.14-934 61.05 kg #REF! 1 Kg #REF!
add Labour allowence on fabrication 20% #REF!
Hoisting and fixng in position
Painting with synthetic enamel paint aera = 17 x 0.2 2.90 sqm #REF! 10 Sqm #REF!
Rate for 4.00 Rmt #REF!
VAT & labour cess 0% #REF!
#REF!
for 1.00 Rmt #REF!
Rate per 1.00 Rmt Rs. #REF!
Rate per 1.00 Kg Rs. #REF!
6 Supplying and fixing of C.I. Single/ Double Socket soil pipes ISI marked conforming to IS:1729-1979 of reputed make
with cement caulked joints and fixing as per site requirements including painting black with Japan paint and fixing
with in cement mortar (1½:1) and including fixing of M.S. clamps if necessary with required no.of Bombay nails etc.,
complete including earth work excavation and refilling etc for Out let arrangement.(item65,Pg.72 of BSSR)

6" dia (152.4mm) Double Socket - TBSP-C.I-02 1 Rmt 998.00 1 Rmt 998.00
Pg,... of the 2015-16- B.SSR -
Earth work excavation (1.00x0.45x0.45 =0.2025 0.2025 Cum 185.64 1 Cum 37.59
Cum
Rate )per 15.00 Rmt 1035.59
Rate per 1 Rmt 1035.59
Overheads & Contractors Profit 141.00
1176.59
VAT & labour cess 0% 0.00
Rate per 1 Rmt 1176.59

7 Supply, delivery and fixing of 110mm dia PVC vent pipe including vent cowl, cost of material and labour charges etc.,
complete for fixing it to the septic tank for 15m height above GL
Cost of 110mm dia PVC Pipe.of 3.00 Mts length 1 No 484.00 3 Rmt 161.33
B.SSR 2015-16-sani. Item No. TBSP-H.I-03
Rate for 15 Rmt PVC pipe 15 Rmt 161.33 1 Rmt 2419.95
Rate for vent cowl SSR item: TBSP-H.II-55 1 No 19.00 1 Each 19.00
PVC Pipe clip SSR item - TBSP-H.II-61 10 No 18.00 1 Each 180.00
Labour charges for laying, fixing and 15 Rmt 70.00 1 Rmt 1050.00
commissioning the PVC pipes including couplers/
bends/ tees etc any diameter including fixing
necessary fittings like bends, plugs, couplers,
junctions, tees, etc with solvent jointing as per
standard practice, as per item No. TBSP-H.IV-01

Add Labour component @ 0.00


Rate for 15 Rmt PVC pipe 3668.95
Rate for 1 Rmt 244.60
Overheads & Contractors Profit 13.615% 33.30
277.90
VAT & labour cess 0% 0.00
Rate per 1 Rmt 277.90
447524687.xlsx - data-Road
8 BLD-CSTN-3-11-(28)-Using Concrete mixture up Pageto Plinth
1653 Level ; Plain Cement concrete nominal mix M-20 prop
of 2191
(Cement : fine aggregate: coarse aggregate ) using 12mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage
charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top
surface to the required level, curing etc., complete for finished item of work with nomonal reinforcement
Unit : 1cum
A. MATERIALS:
Cement-(ENC-PH.Memo.No.146/Cement&Steel / 330.00 Kg 4.60 1 Kg 1518.00
T1
12mm Graded Metal (C-Mat- Sn.45) 0.90 Cum 1118.70 1 Cum 1006.83
Sand (C-Mat-Lead statement-S.No.1) 0.45 Cum 1303.00 1 Cum 586.35
Water (including for curing) -M-189-b. irrigation 1.20 Kl 98.00 1 Kl 117.60
SSR
B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity 1 hour 397.50 1 hour 397.50

C. LABOUR:
Mason 1st class (labour-Irri-Skilled .S.N.11) 0.10 Nos 564.00 1 Nos 56.40
Mazdoor (irri-Un skilled-Sn.3) 1.39 Nos 510.00 1 Nos 708.90
Total Rs 4391.58
Overheads & Contractors Profit 13.615% 597.91
Total 4989.49
VAT & labour cess 0% 0.00
Rate per cu.m. Rs 4989.49
a CC (1:2:4) for 1.50m dia, 50mm thick ring of
0.30m height
Qty of Ring = 2 x pi x r x t x h
Basic Rate per Cum. 0.072 Cum 4989.49 1 Cum 359.24
Centering Charges for Bed Blocks and Bands 0.072 Cum 64.00 1 Cum 4.61
Labour charges for Bed blocks-Pg-84 to 89 0.072 Cum 325.00 1 Cum 23.40
Add Labour component @ 20% 4.68
add steel @ 40 Kg/ Cum (6mm rods) 2.88 Kg 46.00 1 Kg 132.48
Total Rs 524.41
VAT & labour cess 0% 0.00
Rate per each ring Rs 524.41

b Supply & fixing CC (1:2:4) cover 1.60m dia with


nominal reinforcement 100mm thick and hooks
for lifting
Basic Rate of CC (1:2:4) pi x r^2 x Thickness 0.20 Cum 4989.49 1 Cum 997.90
Centering Charges for Bed Blocks and Bands 0.2 Cum 64.00 1 Cum 12.80
Labour charges for Bed blocks-Pg-84 to 89 0.2 Cum 325.00 1 Cum 65.00
Add Labour component @ 20% 13.00
add steel @ 50 Kg/ Cum 10.00 Kg 46.00 1 Kg 460.00
Total 1548.70
VAT & labour cess 0% 0.00
Rate per each slab of 1.60m dia and 100mm Rs. 1548.70
thick

9 BLD-CSTN-3-11-(28)-Using Concrete mixture up to Plinth Level ; Plain Cement concrete nominal mix M-20 prop
(Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage
charges on all materials, labour charges , for mixing , laying, concrete , ramming in layers, finishing to required
level, curing etc., complete for finished item of work with nomonal reinforcement

Unit : 1cum
A. MATERIALS:
Cement-(ENC-PH.Memo.No.146/Cement&Steel / 330.00 Kg 4.60 1 Kg 1518.00
T1
20mm Graded Metal (C-Mat- Sn.49) 0.90 Cum 1406.20 1 Cum 1265.58
Sand (C-Mat-Lead statement-S.No.1) 0.45 Cum 1303.00 1 Cum 586.35
Water (including for curing) -M-189-b. irrigation 1.20 Kl 98.00 1 Kl 117.60
SSR
B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity 1 hour 397.50 1 hour 397.50
447524687.xlsx - data-Road
C. LABOUR: Page 1654 of 2191
Mason 1st class (labour-Irri-Skilled .S.N.11) 0.10 Nos 564.00 1 Nos 56.40
Mazdoor (irri-Un skilled-Sn.3) 1.39 Nos 510.00 1 Nos 708.90
Total Rs 4650.33
Overheads & Contractors Profit 13.615% 633.14
Total 5283.47
VAT & labour cess 0% 0.00
Rate per cu.m. Rs 5283.47

a Supply & fixing CC (1:2:4) cover 1.20m x 0.30


m in panels with nominal reinforcement 100mm
thick and hooks for lifting
Basic Rate of CC (1:2:4) -1.2x0.30x0.10 0.036 Cum 5283.47 1 Cum 190.20
Centering Charges for Bed Blocks and Bands 0.036 Cum 64.00 1 Cum 2.30
Labour charges for Bed blocks-Pg-84 to 89 0.036 Cum 325.00 1 Cum 11.70
Add Labour component @ 0% 0.00
add steel @ 75 Kg/ Cum 2.70 Kg 46.00 1 Kg 124.20
Total 328.40
Rate per each slab of 1.20m x 0.3m- 0.1m thick Rs. 328.40

b Vertical walls of plane surface


Plain walls up to 3.00m height & thickness of 200 mm
Basic rate of CC ( 1:2:4) 1.00 Cum 4391.58 1 Cum 4391.58
Centering charges for RCC vertical walls of plain 5.00 Sqm 1063.00 1 Sqm 5315.00
surface up to 3 m height.
Rs 9706.58
Overheads & Contractors Profit 1358.92
Total 11065.50
VAT & labour cess 0% 0.00
Rate per One Cum Rs 11065.50

c Vertical walls of plane surface


Plain walls up to 3.00m height & thickness of 250 mm
Basic rate of CC ( 1:2:4) 1.00 Cum 4391.58 1 Cum 4391.58
Centering charges for RCC vertical walls of plain 4.00 Sqm 1063.00 1 Sqm 4252.00
surface up to 3 m height.
Rs 8643.58
Overheads & Contractors Profit 1210.10
Total 9853.68
VAT & labour cess 0% 0.00
Rate per One Cum Rs 9853.68

10 Supply and delivery of 6mm thick rubber packing confirming to IS including cost and conveyance, packing,
farwarding, transit risk etc.complete including all taxes and duties but excluding VAT.
Cost as per SSR- PH Items-Pg … Table.No.31- 1 Kg 103.00 1 Kg 103.00
Sn.4
over heads & contractors profit 14.42
VAT & labour cess 0% 0.00
Rate per 1 Kg Rs 117.42

11 Supply and delivery of MS Bolts and Nuts with double washers confirming to IS specification including cost and
conveyance, packing, farwarding, transit risk etc.complete including all taxes and duties but excluding VAT..
Cost as per SSR- PH Items-Pg … 1 Kg 123.00 1 Kg 85.00
Table.No.31.Sn.5
over heads & contractors profit 11.90
VAT & labour cess 0% 0.00
Rate per 1 Kg Rs 96.90

447524687.xlsx - data-Road
12 BLD-CSTN-4-1-(34) : Providing High Yield Strength Deformed
Page 1655 of 2191 (HYSD)/ Thermo Mechanically Treated (TMT) / Mild
steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including
labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks
of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all
wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover
blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including
sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126

Unit = t
(a) Material
HYSD bars including 5 per cent for overlaps and 1.05 Ton Err:509 1 Ton Err:509
wastage
Binding wire- SSR (Irrigation) item No 3, Pg 11 6.00 kg #REF! 1 kg #REF!
B) LABOUR for cutting, bending, shifting to site,
tying, lap splicing and placing in position
Blacksmith/ Bar bender ( Labour-Irrigation-Skilled- 10.00 day 678.00 1 day 6780.00
Sn.1)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 10.00 day 510.00 1 day 5100.00
Sundries on Material
Err:509
(c) Overheads on (a+b)
(d) Contractor’s profit on (a+b+c) 14% Err:509
Rate per t = a+b+c+d 1 MT Err:509
VAT & Labour cess. 0% Err:509
Rate per One MT Sub Total: Err:509
Rate per One Kg Rs. Err:509

13 BLD-CSTN-8-1-(76) : Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and
conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all
operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for
finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:3) 0.15 Cum 3877.65 1 Cum 581.65
B. LABOUR:
Mason 1st class (labour-Irri-Skilled .S.N.11) 0.60 Nos 564.00 1 Nos 338.40
Mazdoor (irri-Un skilled-Sn.3) 0.96 Nos 510.00 1 Nos 489.60
Total A+B 1409.65
C.Overheads & Contractors Profit 14% 191.92
Sub-Total 1601.57
VAT & labour cess 0% 0.00
Rate per 10 Sqm Rs 1601.57

14 BLD-CSTN-9-5: White washing two coats with whiting of approved quality to give an even shade after thoroughly
brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour
charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding
conveyance charges of materials
Whiting / White Cement -BMS-W.68-item- 2.00 Kg #REF! 1 Kg #REF!
Gum, conjee water, or prickly pear juice including LS 10.00
necessary fire wood
Brick Layers / Painter ( labour - Irri-Skilled-Sn.11) 0.21 Nos 564.00 1 Nos 118.44
Mazdoor (irri-Un skilled-Sn.3) 0.32 Nos 510.00 1 Nos 163.20
#REF!
Sundries including brushes, ladders, etc., 1% #REF!
Rs #REF!
over heads & contractors profit 14% #REF!
Sub-Total #REF!
VAT & labour cess 0% #REF!
Rate per 10 Sqm Rs #REF!

447524687.xlsx - data-Road
15 BLD-CSTN-12-12-(193): Painting with Synthetic Enamel paints
Page 1656 of 2191 - One Coat - for New Wood Work, Old Wood Work &
New Iron Work including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and
all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).
Synthetic Enamel paint (at 20 sqm / litre as per 0.70 Ltr #REF! 1 Ltr #REF!
British Paints (I) Ltd.- (BMT-J.31-Sn-400)
1st Class Painter (I. Skilled Labour-Irrigation-Sn.35) 0.21 day. 648.00 1 day. 136.08
2nd Class Painter (II. Semi skilled Labour-Irri- 0.49 day. 540.00 1 day. 264.60
Sn.37)
Sundries including brushes, soap, putty etc., 0.00
Total Rs #REF!
over heads & contractors profit 14% #REF!
Total cost for 10 sqm #REF!
VAT & Labour cess. 0% #REF!
Rate per 10 Sqm Rs #REF!

16 BLD-CSTN-2-9 (17); Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations
and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering
and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire
charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

out put 6.00 Cum


a)  Labour
Mate ( Labour- R&B-S.N.71) 0.00 Nos 540.00 1 Nos 0.00
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 0.31 Nos 510.00 1 Nos 158.10
b&c) Overheads & Contractors Profit 14% 21.53
Cost for 6 cum = a+b+c 179.63
Rate per cum = (a+b+c)/6 29.94
VAT & labour cess 0% 0.00
Rate per 1 Cum 29.94

17 Carting of surplus excavated rock from the site to a distance suitable including loading, unloading charges, cost &
conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete.
a Rock/CC
Page No.328 of SSR, Conveyance rates - 5.00 Km 1 cum 57.10 1 Cum 57.10
VAT & Labour cess. 0% 0.00
Rate per 1 Cum Rs 57.10

b Earth
Page No.124 of SSR, Conveyance rates - 5.00 Km 1 cum 57.10 1 Cum 57.10
VAT & Labour cess. 0% 0.00
Rate per 1 Cum Rs 57.10

18 BLD-CSTN-9-5-(103): Flooring with Glass Mosaic Tiles Group 1 series or equivalent quality 20x20x4 mm
thick , set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including
neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to
full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc.,
complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of
conveyance of all materials.

Unit = 10 sqm
A. MATERIALS:
Supply of glazed full body glass mosaic tiles of 20 x 10.50 sqm 0.00 1 sqm 0.00
20 x 4 mm thick in specified pattern 1st Quality of
any colour and design TBSC-C.VI-01
Cement for CM (1:8) for base coat 21.60 kg. 4.60 1 kg. 99.36
Cement for slurry 33.00 kg. 4.60 1 kg. 151.80
Cement for Pointing with CM (1:3) 6.000 kg. 4.60 1 kg. 27.60
Sand for CM (1:8) 0.12 cum 1493.00 1 cum 179.16
Sand for pointing 0.020 cum 1493.00 1 cum 29.86
B. LABOUR
Mason 1st class (labour-Irri-Skilled .S.N.11) 0.96 day 564.00 1 day 541.44

447524687.xlsx - data-Road
2nd Class Mason (labour-Irri-Semi skilled.S.N.35) 2.24
Page 1657 of 2191 day 540.00 1 day 1209.60
Mazdoor (Both Men and Women) (irri-Un skilled- 3.30 day 510.00 1 day 1683.00
Sn.3) 3921.82
Add water charges 1% 1% 39.22
for fixing labour charges 0.00 1 sqm 0.00
Grand Total 3961.04
over heads & contractors profit 14% 539.3
Total cost for 10 sqm 4500.34
VAT & labour cess 0% 0.00
Rate per 10 Sqm Rs 4500.34

DATA - INFILTRATION GALLERY


1 Excavation of trenches for infiltration galleries, syphon lines and connecting mains in all soils under water including
all leads, lifts, shoring, strutting, bailing out water and removal of shoring and strutting materials, after completion of
pipe line work.
a item No.30 of PH SSR
0.00 Mts to 1.00 Mts depth below GL out put 10.00 Cum
Basic Rate as per PH SSR item No. 29, Pg.7 10 Cum #REF! 10 Cum #REF!
Overheads & Contractors Profit #REF!
Cost for 10 cum #REF!
Rate per cum =/10 #REF!
VAT & labour cess etc,. 0% #REF!
Rate per 1 Cum Rs #REF!

b 1.00 Mts to 2.00 Mts depth below GL out put 10.00 Cum
Basic Rate as per PH SSR item No. 30 10 Cum #REF! 10 Cum #REF!
Overheads & Contractors Profit #REF!
Cost for 10 cum #REF!
Rate per cum =/10 #REF!
VAT & labour cess etc,. 0% #REF!
Rate per 1 Cum Rs #REF!

c 2.00 Mts to 5.00 Mts depth below GL out put 10.00 Cum
Basic Rate as per PH SSR item No. 30 10 Cum #REF! 10 Cum #REF!
Overheads & Contractors Profit #REF!
Cost for 10 cum #REF!
Rate per cum =/10 #REF!
VAT & labour cess etc,. 0% #REF!
Rate per 1 Cum Rs #REF!

d Beyond 5 m deep under water for every Depth 6.00 m


additional 1 m depth over item 'c'
5.00 Mts to 6.00m 10 Cum #REF! 10 Cum #REF!
for extra depth beyond 5.00 Mts 1.00 Mts #REF! 1 Mts #REF!
#REF!
Overheads & Contractors Profit #REF!
Cost for 10 cum #REF!
Rate per cum =/10 #REF!
VAT & labour cess etc,. 0% #REF!
Rate per 1 Cum Rs #REF!

e Beyond 5 m deep under water for every Depth 7.00 m


additional 1 m depth over item 'c'
6.00 Mts to 7.00m 1 Cum #REF! 1 Cum #REF!
for extra depth beyond 5.00 Mts 2.00 Mts #REF! 1 Mts #REF!
#REF!
Overheads & Contractors Profit #REF!
Cost for 10 cum #REF!
Rate per cum =/10 #REF!
VAT & labour cess etc,. 0% #REF!
Rate per 1 Cum Rs #REF!

447524687.xlsx - data-Road
f Beyond 5 m deep under water for every Depth
Page 1658 of 2191 8.00 m
additional 1 m depth over item 'c'
7.00 Mts to 8.00m 1 Cum #REF! 1 Cum #REF!
for extra depth beyond 5.00 Mts 3.00 Mts #REF! 1 Mts #REF!
#REF!
Overheads & Contractors Profit #REF!
Cost for 10 cum #REF!
Rate per cum =/10 #REF!
VAT & labour cess etc,. 0% #REF!
Rate per 1 Cum Rs #REF!

g Beyond 5 m deep under water for every Depth 9.00 m


additional 1 m depth over item 'c'
8.00 Mts to 9.00m 1 Cum #REF! 1 Cum #REF!
for extra depth beyond 5.00 Mts 4.00 Mts #REF! 1 Mts #REF!
#REF!
Overheads & Contractors Profit #REF!
Cost for 10 cum #REF!
Rate per cum =/10 #REF!
VAT & labour cess etc,. 0% #REF!
Rate per 1 Cum Rs #REF!

h Beyond 5 m deep under water for every Depth 10.00 m


additional 1 m depth over item 'c'
9.00 Mts to 10.00m 1 Cum #REF! 1 Cum #REF!
for extra depth beyond 5.00 Mts 5.00 Mts #REF! 1 Mts #REF!
#REF!
Overheads & Contractors Profit #REF!
Cost for 10 cum #REF!
Rate per cum =/10 #REF!
VAT & labour cess etc,. 0% #REF!
Rate per 1 Cum Rs #REF!

2 Laying and jointing perforated RCC pipes inclusive of bailing out water and jointing with cement fillets and all other
incidental charges for infiltration gallery inclusive of bailing out water by pumping to keep the trench reasonably dry to
facilitate the work excluding cost of perforated pipes and collars.
a Dia of the pipe in mm 300 mm
Rate as per the PH SSR item No. 30 for every 25 mm #REF! 1 Rmt #REF!
Overheads & Contractors Profit #REF!
Total #REF!
VAT & labour cess etc,. 0% #REF!
Rate per 1 Rmt Rs #REF!

b Dia of the pipe in mm 600 mm


Rate as per the PH SSR item No. 30 for every 25 mm #REF! 1 Rmt #REF!
Overheads & Contractors Profit #REF!
Total #REF!
VAT & labour cess etc,. 0% #REF!
Rate per 1 Rmt Rs #REF!

c Dia of the pipe in mm 700 mm


Rate as per the PH SSR item No. 30 for every 25 mm #REF! 1 Rmt #REF!
Overheads & Contractors Profit #REF!
Total #REF!
VAT & labour cess etc,. 0% #REF!
Rate per 1 Rmt Rs #REF!

3 Lowering the RCC plain ended pipes carefully into the trench laying them true to alignment and gradient, jointing
RCC pipes with cement joints including curing, the cost of jointing materials i.e., Cement Mortar (1:1.5), hemp yarn
etc., and testing including filling with water with a water lead upto 500 metres excluding cost of rubber rings as per
BIS No.783/85.
a Dia of the pipe in mm 300 mm
Rate as per the PH SSR item No. 30 for every 25 mm #REF! 1 Rmt #REF!
447524687.xlsx - data-Road
Overheads & Contractors Profit Page 1659 of 2191 #REF!
Total #REF!
VAT & labour cess etc,. 0% #REF!
Rate per 1 Rmt Rs #REF!

b Dia of the pipe in mm 600 mm


Rate as per the PH SSR item No. 31 for every 25 mm #REF! 1 Rmt #REF!
Overheads & Contractors Profit #REF!
Total #REF!
VAT & labour cess etc,. 0% #REF!
Rate per 1 Rmt Rs #REF!

c Dia of the pipe in mm 700 mm


Rate as per the PH SSR item No. 31 for every 25 mm #REF! 1 Rmt #REF!
Overheads & Contractors Profit #REF!
Total #REF!
VAT & labour cess etc,. 0% #REF!
Rate per 1 Rmt Rs #REF!

4 RBR-FNDN-2; Collection ,Supply and filling of 40 mm metal from approved quarry to work site and stacking at work
site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour charges etc.
complete as per standard specifications.
40 mm Metal Filling out put 6.00 Cum
a) Material
40mm size HG metal ( C-Mat - Sn. 57) 6.00 Cum Err:509 1 Cum Err:509
b)  Labour
Mate ( Labour- R&B-S.N.71) 0.00 Nos 540.00 1 Nos 0.00
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 0.31 Nos 510.00 1 Nos 158.10
Sub Total Err:509
b&c) Overheads & Contractors Profit 14% Err:509
Cost for 6 cum = a+b+c Err:509
Rate per cum = (a+b+c)/6 Err:509
VAT & labour cess etc,. 0% Err:509
Rate per 1 Cum Err:509

5 RBR-FNDN-2 ; Collection ,Supply and filling of 20 to 12mm metal from approved quarry to work site and stacking at
work site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour
charges etc. complete as per standard specifications.
20 to 12mm Metal Filling out put 6.00 Cum
a) Material
20 to 12mm size HG metal ( C-Mat- Sn. 47 ) 6.00 Cum Err:509 1 Cum Err:509
b)  Labour
Mate ( Labour- R&B-S.N.71) 0.00 Nos 540.00 1 Nos 0.00
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 0.31 Nos 510.00 1 Nos 158.10
Sub Total Err:509
b&c) Overheads & Contractors Profit 14% Err:509
Cost for 6 cum = a+b+c Err:509
Rate per cum = (a+b+c)/6 Err:509
VAT & labour cess etc,. 0% Err:509
Rate per 1 Cum Err:509

6 RBR-FNDN-2: Collection ,Supply and filling of 12 to 6 mm metal from approved quarry to work site and stacking at
work site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour
charges etc. complete as per standard specifications.
12 to 6 mm Metal Filling out put 6.00 Cum
a) Material
12 to 6mm size HG metal ( C- Mat - Sn . 42 ) 6.00 Cum 463.70 1 Cum 2782.20
b)  Labour
Mate ( Labour- R&B-S.N.71) 0.00 Nos 540.00 1 Nos 0.00
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 0.31 Nos 510.00 1 Nos 158.10
Sub Total 2940.30
b&c) Overheads & Contractors Profit 14% 400.32

447524687.xlsx - data-Road
Cost for 6 cum = a+b+c Page 1660 of 2191 3498.72
Rate per cum = (a+b+c)/6 583.12
VAT & labour cess etc,. 0% 0.00
Rate per 1 Cum 583.12

7 RBR-FNDN-2: Collection ,Supply and filling of Coarsed sand from approved quarry to work site and stacking at
work site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour
charges etc. complete as per standard specifications.
Coarsed sand Filling out put 6.00 Cum
a) Material
Coarsed sand ( C- Mat - Sn. 1) 6.00 Cum 1303.00 1 Cum 7818.00
b)  Labour
Mate ( Labour- R&B-S.N.71) 0.00 Nos 540.00 1 Nos 0.00
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 0.31 Nos 510.00 1 Nos 158.10
Sub Total 7976.10
b&c) Overheads & Contractors Profit 14% 1085.95
Cost for 6 cum = a+b+c 9220.15
Rate per cum = (a+b+c)/6 1536.69
VAT & labour cess etc,. 0% 0.00
Rate per 1 Cum 1536.69

8 RBR-FNDN-2 : Collection ,Supply and filling of Fine sand from approved quarry to work site and stacking at work
site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour charges etc.
complete as per standard specifications.
Fine sand Filling out put 6.00 Cum
a) Material
Fine sand ( C- Mat - Sn. 2) 6.00 Cum 1303.00 1 Cum 7818.00
b)  Labour
Mate ( Labour- R&B-S.N.71) 0.00 Nos 540.00 1 Nos 0.00
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 0.31 Nos 510.00 1 Nos 158.10
Sub Total 7976.10
b&c) Overheads & Contractors Profit 14% 1085.95
Cost for 6 cum = a+b+c 9220.15
Rate per cum = (a+b+c)/6 1536.69
VAT & labour cess etc,. 0% 0.00
Rate per 1 Cum 1536.69

9 RBR-FNDN-2 : Collection ,Supply and filling of Filter media from approved quarry to work site and stacking at work
site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour charges etc.
complete as per standard specifications.
Filter media Filling out put 6.00 Cum
a) Material
Filter media ( C- Mat - Sn. 14) 6.00 Cum 774.95 1 Cum 4649.70
b)  Labour
Mate ( Labour- R&B-S.N.71) 0.00 Nos 540.00 1 Nos 0.00
Mazdoor (Labour-Irrigation-Unskilled-Sn.3) 0.31 Nos 510.00 1 Nos 158.10
Sub Total 4807.80
b&c) Overheads & Contractors Profit 14% 654.58
Cost for 6 cum = a+b+c 5620.48
Rate per cum = (a+b+c)/6 936.75
VAT & labour cess etc,. 0% 0.00
Rate per 1 Cum 936.75

DATA - INTAKE WELL


10 RBR-FNDN-1-(i-A-i) : Earthwork in excavation for structures as per drawing and technical specifications Clause
305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material
and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable
material as per Technical Specification 305 MORD / 304 MORTH - in Ordinary soil

Ordinary Soils : for Sumps, intake wells, Thrust Blocks and Man Holes etc,.
By Manual means
up to 3.00 Mts depth below GL out put 10.00 Cum
a)  Labour
447524687.xlsx - data-Road
Mate ( Labour- R&B-S.N.71) Page 1661 of 21910 Nos. 540.00 1 Each 0.00
Mazdoor (Unskilled) ( Labour-Irrigation-Unskilled- 3.64 Nos. 510.00 1 Each 1856.40
S.N.3)
Sub total 1856.40
c&d) Overheads & Contractors Profit 13.615% 252.75
Cost for 240 cum = a+b+c+d 2109.15
Rate per cum = (a+b+c+d)/10 210.92
VAT & labour cess 0% 0.00
- 0% 0.00
Rate per 1 Cum excluding Dewatering Rs 210.92

11 RBR-FNDN-1-(i-B-i) : Earthwork in excavation for structures as per drawing and technical specifications Clause
305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material
and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable
material as per Technical Specification 305 MORD / 304 MORTH - in Ordinary soil - by Machanical means

Ordinary soils-Mechcanical Means-Upto 3 m depth out put 240 Cum


a)  Labour
Mate 0 Nos. 540.00 1 Each 0.00
Mazdoor (Unskilled) 8.32 Nos. 510.00 1 Each 4243.20
b) Machinery
Hydraulic Excavator 1 cum bucket capacity 6 hours 2967.90 1 hours 17807.40
( shovel- 0.85) Sub total 22050.60
c&d) Overheads & Contractors Profit 14% 3002.19
Cost for 240 cum = a+b+c+d 25052.79
Rate per cum = (a+b+c+d)/240 104.39
VAT & labour cess 0% 0.00
- 0% 0.00
Rate per 1 Cum excluding Dewatering Rs 104.39
Add extra for Dewatering @ 5% 5% 5.22
b Rate per 1 Cum including Dewatering Rs 109.61

12 RBR-FNDN-1-(i-B-ii) : Earthwork in excavation for structures as per drawing and technical specifications Clause
305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material
and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable
material as per Technical Specification 305 MORD / 304 MORTH - in Ordinary soil

Ordinary Soils-Mechcanical Means-3 m to 6 m depth out put 210 Cum


a)  Labour
Mate 0 Nos. 540.00 1 Each 0.00
Mazdoor (Unskilled) 8.32 Nos. 510.00 1 Each 4243.20
b) Machinery
Hydraulic Excavator 1 cum bucket capacity 6 hours 2967.90 1 hours 17807.40
Sub total 22050.60
c&d) Overheads & Contractors Profit 14% 3002.19
Cost for 240 cum = a+b+c+d 25052.79
Rate per cum = (a+b+c+d)/240 119.3
VAT & labour cess 0% 0.00
- 0% 0.00
Rate per 1 Cum excluding Dewatering Rs 119.30
Add extra for Dewatering @ 5% 5% 5.97
b Rate per 1 Cum including Dewatering Rs 125.27

13 RBR-FNDN-1-(i-B-iii) : Earthwork in excavation for structures as per drawing and technical specifications Clause
305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material
and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable
material as per Technical Specification 305 MORD / 304 MORTH - in Ordinary soil

Ordinary Soils-Mechcanical Means-above 6 m depth out put 180 Cum


a)  Labour
Mate 0 Nos. 540.00 1 Each 0.00
Mazdoor (Unskilled) 8.32 Nos. 510.00 1 Each 4243.20
b) Machinery
447524687.xlsx - data-Road
Hydraulic Excavator 1 cum bucket capacity Page 1662 of 21916 hours 2967.90 1 hours 17807.40
Sub total 22050.60
c&d) Overheads & Contractors Profit 14% 3002.19
Cost for 180 cum = a+b+c+d 25052.79
Rate per cum = (a+b+c+d)/180 139.18
- 0% 0.00
Rate per 1 Cum excluding Dewatering Rs 139.18
Add extra for Dewatering @ 5% 5% 6.96
b Rate per 1 Cum including Dewatering Rs 146.14

14 RBR-FNDN-1 - B -III - Earthwork in excavation for structures as per drawing and technical specifications Clause
305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material
and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable
material as per Technical Specification 305 MORD / 304 MORTH - Ordinary Soils : for Sumps, Thrust Blocks and
Man Holes etc,.Hard rock (requiring blasting) - Upto 3 m depth

Hard rock (requiring blasting)-Upto 3 m depth out put 10 Cum


a)  Labour
Mate ( Labour- R&B-S.N.71) 0 Nos. 540.00 1 Each 0.00
Driller (labour R&B- S.N.31) 0.50 Nos. 660.00 1 Each 330.00
Blaster (labour R&B- S.N.14) 0.25 Nos. 648.00 1 Each 162.00
Mazdoor (Unskilled) ( Labour-Irrigation-Unskilled- 8.35 Nos. 510.00 1 Each 4258.50
S.N.3)
b) Machinery
Air compressor 210 cfm / 250 cfm with 2 jack 1 hours 1358.70 1 hours 1358.70
hammers ( Hire charges- Irrigation-S.N.3)
c) Materials
Gelatin 80 per cent -( M-104 -Irrigation SSR ) 3.50 Kg #REF! 1 Kg #REF!
Electric Detonators @ 1 detonator for 2 gelatine 14 Nos. #REF! 100 Nos. #REF!
sticks of 285 gm each -(M-094 -Irrigation SSR)
Sub total #REF!
c&d) Overheads & Contractors Profit 14% #REF!
Cost for 240 cum = a+b+c+d #REF!
Rate per cum = (a+b+c+d)/10 #REF!
VAT & Labour cess. #REF! #REF!
a Rate per 1 Cum excluding Dewatering Rs #REF!
Add extra for Dewatering @ 5% 5% #REF!
b Rate per 1 Cum including Dewatering Rs #REF!

11 RBR-EECD-9 -ii-B : :Excavation in hard rock (blasting prohibited) with rock breakers including breaking rock, loading
in tippers and disposal with initial lift of 3 mts and lead upto 1000 metres, trimming bottom and side slopes in
accordance with requirements of lines, grades and cross- sections as per Technical Specification Clause 302.3.5
MORD / 301 MORTH , by Machanical means for Sumps, Thrust Blocks and Man Holes etc,.
out put 36.00 Cum
a)  Labour
Mate ( Labour- R&B-S.N.71) 0.000 day 540.00 1 day 0.00
Mazdoor (Unskilled) ( Labour-Irrigation-Unskilled- 10.400 day 510.00 1 day 5304.00
S.N.3)
b) Machinery
Hydraulic excavator 0.9 cum with rock breaker 6.000 hour 2967.90 1 hour 17807.40
attachment @ 6 cum per hour
Tipper 5.5 cum-1 trip per hour ( R&B-Hire-Sn.6) 6.50 hour 924.10 1 hour 6006.65
Credit for excavated rock found suitable for use @ -18.00 cum 65.00 1 cum -1170.00
50 per cent of excavated quantity -M-089-Pg.29 -
Irri SSR
Total 27948.05
d) Overheads & Contractors Profit 13.615% 3805.13
31753.18
Rate per cum = a+b+c+d+e)/36 882.03
Add extra for Dewatering @ 5% 5% 44.10
Rate per 1 Cum excluding Dewatering 926.13

447524687.xlsx - data-Road
12 RBR-FNDN-1- (IV) - Hard rock (blasting prohibited)
Page 1663 of-up
2191to 3.00Mts. below GL: Excavation in Hard Rock in
habitant areas where conventional blasting can not be done as per drawings and technical specifications including
setting out, construction of shoring and bracing, dressing of sides and bottom as per Technical Specification 305
MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services
wherever it is possible during the execution and taking all precautionary measures in the restricted areas etc,
complete.
out put 10.00 Cum
a)  Labour
Mate ( Labour- R&B-S.N.71) 0.00 Nos 540.00 1 Nos 0.00
Mazdoor (Unskilled) ( Labour-Irrigation-Unskilled- 5.20 Nos 510.00 1 Nos 2652.00
S.N.3)
b) Machinery
Air compressor 210 cfm / 250 cfm with 2 jack 6.00 hour 1358.70 1 hour 8152.20
hammers ( Hire charges- Irrigation-S.N.3)
sub total ; a+b 10804.20
c&d) Overheads & Contractors Profit 14% 1470.99
Cost for 10 cum = a+b+c+d 12275.19
Rate per cum = a+b+c+d+e)/10 1227.52
VAT & Labour cess. 0% 0.00
a Rate per 1 Cum excluding Dewatering 1227.52
Add extra for Dewatering @ 5% 5% 61.38
b Rate per 1 Cum including Dewatering Rs 1288.90

14 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix
(1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage
charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top
surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

Unit : 1cum
A. MATERIALS:
Cement (ENC-PH.Memo.146/Cement&Steel / T1 / 162.00 Kg 4.600 1 Kg 745.20
Coarse aggregate 40mm graded ( as per Lead 0.90 Cum 1256.20 1 Cum 1130.58
statement. Sn.35)
Fine aggregate (Sand) ( Lead statement-S.N.2 ) 0.45 Cum 1303.00 1 Cum 586.35
Water (including for curing) -M-189- SSR- irrigation 1.20 Kl 98.00 1 Kl 117.60
items 2579.73
B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity 1 hour 397.50 1 hour 397.50
(Hire charges-Irrigation- S.N.16)
397.50
C. LABOUR:
Mason 1st class(labour-Irrigation.S.N.11) 0.10 Nos 564.00 1 Nos 56.40
Mazdoor (irri-Un skilled-Sn.3) 1.39 Nos 510.00 1 Nos 708.90
765.30
Total Rs 3742.53
c&d) Overheads & Contractors Profit 14% 509.55
Rate per cu.m. Rs 4252.08
VAT & labour cess etc,. 0% 0.00
Rate per 1 Cum up to 3.00m initial depth below GL Rs 4252.08

Rate for Extra Delifts


A Rate per 3 to 4.00 m depth from GL
Basic Rate of CC (1:5:10) 1.00 Cum 3742.53 1 Cum 3742.53
Delifting the materials such as stones, concrete 1.00 Cum #REF! 1 Cum #REF!
etc., for concrete below ground level for
construction of masonry ground level reservoirs,
inspection wells,test wells and sump wells etc., for
every 1 m depth or part thereof beyond the initial
depth of 3 meters from ground level.( as per item
no.32.(b) of the PH SSR, Pg.No.8

447524687.xlsx - data-Road
Basic
Page 1664 of 2191 No. of Delift OH& CP VAT & Total
B Depth of CC (1:5:10) from Ground Level Cost Delifts charges @ LC

#REF! 14% 0%
a Rate per 3 to 4.00 m depth from GL 3742.53 1.00 #REF! #REF! #REF! #REF!
b Rate per 4 to 5.00 m depth from GL 3742.53 2.00 #REF! #REF! #REF! #REF!
c Rate per 5 to 6.00 m depth from GL 3742.53 3.00 #REF! #REF! #REF! #REF!
d Rate per 6 to 7.00 m depth from GL 3742.53 4.00 #REF! #REF! #REF! #REF!
e Rate per 7 to 8.00 m depth from GL 3742.53 5.00 #REF! #REF! #REF! #REF!
f Rate per 8 to 9.00 m depth from GL 3742.53 6.00 #REF! #REF! #REF! #REF!
g Rate per 9 to 10.00 m depth from GL 3742.53 7.00 #REF! #REF! #REF! #REF!
h Rate per 10 to 11.00 m depth from GL 3742.53 8.00 #REF! #REF! #REF! #REF!
i Rate per 11 to 12.00 m depth from GL 3742.53 9.00 #REF! #REF! #REF! #REF!
j Rate per 12 to 13.00 m depth from GL 3742.53 10.00 #REF! #REF! #REF! #REF!
k Rate per 13 to 14.00 m depth from GL 3742.53 11.00 #REF! #REF! #REF! #REF!
l Rate per 14 to 15.00 m depth from GL 3742.53 12.00 #REF! #REF! #REF! #REF!
m Rate per 15 to 16.00 m depth from GL 3742.53 13.00 #REF! #REF! #REF! #REF!
n Rate per 16 to 17.00 m depth from GL 3742.53 14.00 #REF! #REF! #REF! #REF!
o Rate per 17 to 18.00 m depth from GL 3742.53 15.00 #REF! #REF! #REF! #REF!
p Rate per 18 to 19.00 m depth from GL 3742.53 16.00 #REF! #REF! #REF! #REF!
q Rate per 19 to 20.00 m depth from GL 3742.53 17.00 #REF! #REF! 0.0 #REF!

15 BLD-CSTN-3-14-(31)-A: Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using
WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from
approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement
content as per IS code . for FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth)

M-30 GRADE OF MIX


a Material
cement (ENC-PH.Memo.146/Cement & Steel /T1 400.00 Kg 4.60 1 Kg 1840.00
20mm HBG graded metal (Lead statement-S.N.47) 0.800 Cum Err:509 1 Cum Err:509

Sand ( Lead statement-S.N.2 ) 0.400 Cum 1303.00 1 Cum 521.20


Err:509
b Labour
Mason 1st class (labour-Irrigation.S.N.11) 0.133 Nos. 564.00 1 Each 75.01
2nd Class Mason (labour-Irrigation.S.N.35) 0.267 Nos. 540.00 1 Each 144.18
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 4.600 Nos. 510.00 1 Each 2346.00
2565.19
c Machinary
Weigh Batcher Hire charges (Machine mixing) 1.333 hour 608.10 1 hour 810.60
charges ( Hire -Irrigation-S.N.19- Concrete mixer)
Vibrator hire charges ( Hire -irrigation -41) 1.333 hour 205.00 1 hour 273.27
1083.87
Water (including for curing) -M-189- SSR- irrigation 1.20 Kl 98.00 1 Kl 117.60
items BASIC COST per 1 cum Rs Err:509

A Base slab and Haunches and Toe


R.C.C. M 30 Per Cum 1.00 Cum Err:509 1 Cum Err:509
Centering charges ,Pg.106 to 108 of Bld. 1.A 1.00 Cum 288.00 1 Cum 288.00
Labour charges,Pg No. 106 to 108 of Bld. Items 1.00 Cum 631.00 1 Cum 631.00
Add Labour component @ 20% 126.20
Err:509
Overheads & Contractors Profit 14% Err:509
Total Err:509
VAT & labour cess etc,. 0% Err:509
447524687.xlsx - data-Road
Rate per 1 Cum up to 3.00m initial depth from GL Page 1665 of 2191 Rs Err:509

Rate for Extra Delifts


B Rate per 3 to 4.00 m depth below GL
Basic Rate of RCC-M30 1.00 Cum Err:509 1 Cum Err:509
Delifting the materials such as stones, concrete 1.00 Cum #REF! 1 Cum #REF!
etc., for concrete below ground level for
construction of masonry ground level reservoirs,
inspection wells,test wells and sump wells etc., for
every 1 m depth or part thereof beyond the initial
depth of 3 meters from ground level.( as per item
no.32.(b) of the PH SSR, Pg.No.8
Depth of RCC M-30 for Base slab from Ground Basic No. of Delift OH& CP VAT & Total
C Cost Delifts charges @ LC
Level
#REF! 14% 0%
a Rate per 3 to 4.00 m depth from GL Err:509 1.00 #REF! #REF! #REF! #REF!
b Rate per 4 to 5.00 m depth from GL Err:509 2.00 #REF! #REF! #REF! #REF!
c Rate per 5 to 6.00 m depth from GL Err:509 3.00 #REF! #REF! #REF! #REF!
d Rate per 6 to 7.00 m depth from GL Err:509 4.00 #REF! #REF! #REF! #REF!
e Rate per 7 to 8.00 m depth from GL Err:509 5.00 #REF! #REF! #REF! #REF!
f Rate per 8 to 9.00 m depth from GL Err:509 6.00 #REF! #REF! #REF! #REF!
g Rate per 9 to 10.00 m depth from GL Err:509 7.00 #REF! #REF! #REF! #REF!
h Rate per 10 to 11.00 m depth from GL Err:509 8.00 #REF! #REF! #REF! #REF!
i Rate per 11 to 12.00 m depth from GL Err:509 9.00 #REF! #REF! #REF! #REF!
j Rate per 12 to 13.00 m depth from GL Err:509 10.00 #REF! #REF! #REF! #REF!
k Rate per 13 to 14.00 m depth from GL Err:509 11.00 #REF! #REF! #REF! #REF!
l Rate per 14 to 15.00 m depth from GL Err:509 12.00 #REF! #REF! #REF! #REF!
m Rate per 15 to 16.00 m depth from GL Err:509 13.00 #REF! #REF! #REF! #REF!
n Rate per 16 to 17.00 m depth from GL Err:509 14.00 #REF! #REF! #REF! #REF!
o Rate per 17 to 18.00 m depth from GL Err:509 15.00 #REF! #REF! #REF! #REF!
p Rate per 18 to 19.00 m depth from GL Err:509 16.00 #REF! #REF! #REF! #REF!
q Rate per 19 to 20.00 m depth from GL Err:509 17.00 #REF! #REF! 0.0 #REF!

16 BLD-CSTN-3-14-(31)-B : Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using
WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from
approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement
content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS

M-30 GRADE OF MIX


Material
cement (ENC-PH.Memo.No.146/Cement & Steel / 400.00 Kg 4.60 1 Kg 1840.00
T1
20mm HBG graded metal (Lead statement-S.N.47) 0.800 Cum Err:509 1 Cum Err:509
Sand ( Lead statement-S.N.2 ) 0.400 Cum 1303.00 1 Cum 521.20
Err:509
Labour
Mason 1st class (labour-Irrigation.S.N.11) 0.167 Nos. 564.00 1 Each 94.19
2nd Class Mason (labour-Irrigation.S.N.35) 0.167 Nos. 540.00 1 Each 90.18
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 5.600 Nos. 510.00 1 Each 2856.00
3040.37
Machinary
Weigh Batcher Hire charges (Machine mixing) 1.333 hour 608.10 1 hour 810.60
charges ( Hire
Vibrator hire -Irrigation-S.N.19-
charges Concrete
( Hire -irrigation -41) mixer) 1.333 hour 205.00 1 hour 273.27
1083.87
Water (including for curing) -M-189- SSR- irrigation 1.20 Kl 98.00 1 Kl 117.60
items BASIC COST per 1 cum Rs Err:509

i Vertical walls of circular faces for Intake well


Circular walls up to 3.00m Height & Thickness 450 mm
a
of
447524687.xlsx - data-Road
M-30 GRADE OF MIX 1.00
Page 1666 of 2191 Cum Err:509 1 Cum Err:509
Centering charges for RCC vertical walls of circular 2.22 Sqm 1352.00 1 Sqm 3001.44
faces up to 3 m height.- 31-b.5-Pg.8 of PH SSR)
Rs Err:509
Overheads & Contractors Profit 14% Err:509
Total Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum up to 3.00m height above Rs Err:509
G.L
i Vertical walls of circular faces for Intake well with extra Delifts below Ground Level
b Rate of 450 thick wall, 3m depth below GL
Basic Rate of 450mm thick RCC-M30 wall 1.00 Cum Err:509 1 Cum Err:509
Delifting the materials such as stones, concrete 1.00 Cum #REF! 1 Cum #REF!
etc., for concrete below ground level for
construction of masonry ground level reservoirs,
inspection wells,test wells and sump wells etc., for
every 1 m depth or part thereof beyond the initial
depth of 3 meters from ground level.( as per item
no.32.(b) of the PH SSR, Pg.No.8

Depth of RCC M-30 for Base slab from Ground Basic No. of Delift OH& CP VAT & Total
A Cost Delifts charges @ LC
Level
#REF! 14% 0%
a Rate per 19 to 20.00 m depth from GL Err:509 17.00 #REF! #REF! #REF! #REF!
b Rate per 18 to 19.00 m depth from GL Err:509 16.00 #REF! #REF! #REF! #REF!
c Rate per 17 to 18.00 m depth from GL Err:509 15.00 #REF! #REF! #REF! #REF!
d Rate per 16 to 17.00 m depth from GL Err:509 14.00 #REF! #REF! #REF! #REF!
e Rate per 15 to 16.00 m depth from GL Err:509 13.00 #REF! #REF! #REF! #REF!
f Rate per 14 to 15.00 m depth from GL Err:509 12.00 #REF! #REF! #REF! #REF!
g Rate per 13 to 14.00 m depth from GL Err:509 11.00 #REF! #REF! #REF! #REF!
h Rate per 12 to 13.00 m depth from GL Err:509 10.00 #REF! #REF! #REF! #REF!
i Rate per 11 to 12.00 m depth from GL Err:509 9.00 #REF! #REF! #REF! #REF!
j Rate per 10 to 11.00 m depth from GL Err:509 8.00 #REF! #REF! #REF! #REF!
k Rate per 9 to 10.00 m depth from GL Err:509 7.00 #REF! #REF! #REF! #REF!
l Rate per 8 to 9.00 m depth from GL Err:509 6.00 #REF! #REF! #REF! #REF!
m Rate per 7 to 8.00 m depth from GL Err:509 5.00 #REF! #REF! #REF! #REF!
n Rate per 6 to 7.00 m depth from GL Err:509 4.00 #REF! #REF! #REF! #REF!
o Rate per 5 to 6.00 m depth from GL Err:509 3.00 #REF! #REF! #REF! #REF!
p Rate per 4 to 5.00 m depth from GL Err:509 2.00 #REF! #REF! #REF! #REF!
q Rate per 3 to 4.00 m depth from GL Err:509 1.00 #REF! #REF! 0.0 #REF!

ii Vertical walls of circular faces for Intake well with extra lifts above Ground Level
a Rate per up to 3 m height above GL 450 mm
M-30 GRADE OF MIX 1.00 Cum Err:509 1 Cum Err:509
Lifting of cement concrete for RCC elevated 1.00 Cum #REF! 1 Cum #REF!
reservoir. For every 1m height or part thereof over
the initial lift of 3 m ( item 32. a. of PH SSR - Pg.8

Basic Cost No. of Lift charges OH& CP VAT & Total


A Height of RCC M-30 -wall from Ground Level Lifts @ LC
#REF! 14% 0%
a Rate per 3 to 4.00 m Height from GL Err:509 1.00 #REF! #REF! #REF! #REF!
b Rate per 4 to 5.00 m Height from GL Err:509 2.00 #REF! #REF! #REF! #REF!
c Rate per 5 to 6.00 m Height from GL Err:509 3.00 #REF! #REF! #REF! #REF!
d Rate per 6 to 7.00 m Height from GL Err:509 4.00 #REF! #REF! #REF! #REF!
e Rate per 7 to 8.00 m Height from GL Err:509 5.00 #REF! #REF! #REF! #REF!
f Rate per 8 to 9.00 m Height from GL Err:509 6.00 #REF! #REF! #REF! #REF!
g Rate per 9 to 10.00 m Height from GL Err:509 7.00 #REF! #REF! #REF! #REF!
h Rate per 10 to 11.00 m Height from GL Err:509 8.00 #REF! #REF! #REF! #REF!
i Rate per 11 to 12.00 m Height from GL Err:509 9.00 #REF! #REF! #REF! #REF!
j Rate per 12 to 13.00 m Height from GL Err:509 10.00 #REF! #REF! #REF! #REF!
k Rate per 13 to 14.00 m Height from GL Err:509 11.00 #REF! #REF! #REF! #REF!
447524687.xlsx - data-Road
l Rate per 14 to 15.00 m Height from GL Page 1667Err:509
of 2191 12.00 #REF! #REF! #REF! #REF!
m Rate per 15 to 16.00 m Height from GL Err:509 13.00 #REF! #REF! #REF! #REF!
n Rate per 16 to 17.00 m Height from GL Err:509 14.00 #REF! #REF! #REF! #REF!
o Rate per 17 to 18.00 m Height from GL Err:509 15.00 #REF! #REF! #REF! #REF!
p Rate per 18 to 19.00 m Height from GL Err:509 16.00 #REF! #REF! #REF! #REF!
q Rate per 19 to 20.00 m Height from GL Err:509 17.00 #REF! #REF! 0.0 #REF!

i Vertical walls of circular faces for Intake well


Circular walls up to 3.00m Height & Thickness 250 mm
a
of
M-30 GRADE OF MIX 1.00 Cum Err:509 1 Cum Err:509
Centering charges for RCC vertical walls of circular 4.00 Sqm 1352.00 1 Sqm 5408.00
faces up to 3 m height.- 31-b.5-Pg.8 of PH SSR)
Rs Err:509
Overheads & Contractors Profit 14% Err:509
Total Err:509
Delifting the materials such as stones, concrete 100% Err:509
etc.,
Rate per for One
concrete
Cum up below ground
to 3.00m level
height for
above Rs Err:509
construction
G.L of masonry ground level reservoirs,
i inspection wells,test wells and sump wells etc., for
Vertical
every 1 mwallsdepthoforcircular faces
part thereof for Intake
beyond well with extra Delifts below Ground Level
the initial
b Rate of 250 thick wall, 3m depth below GL
depth of 3 meters from ground level.( as per item
no.32.(b)
Basic Rate of of
the250mm
PH SSR, Pg.No.8
thick RCC-M30 wall 1.00 Cum Err:509 1 Cum Err:509
Delifting the materials for concrete below GL, for every 1 1.00 Cum #REF! 1 Cum #REF!
m depth beyond the initial depth of 3 m fro GL.( as per
item no.32.(b) of the PH SSR, Pg.No.8

Depth of RCC M-30 for Base slab from Ground Basic Cost No. of Delift OH& CP VAT & Total
A Delifts charges @ LC
Level
#REF! 14% 0%
a Rate per 3 to 4.00 m depth from GL Err:509 1.00 #REF! #REF! #REF! #REF!
b Rate per 4 to 5.00 m depth from GL Err:509 2.00 #REF! #REF! #REF! #REF!
c Rate per 5 to 6.00 m depth from GL Err:509 3.00 #REF! #REF! #REF! #REF!
d Rate per 6 to 7.00 m depth from GL Err:509 4.00 #REF! #REF! #REF! #REF!
e Rate per 7 to 8.00 m depth from GL Err:509 5.00 #REF! #REF! #REF! #REF!
f Rate per 8 to 9.00 m depth from GL Err:509 6.00 #REF! #REF! #REF! #REF!
g Rate per 9 to 10.00 m depth from GL Err:509 7.00 #REF! #REF! #REF! #REF!
h Rate per 10 to 11.00 m depth from GL Err:509 8.00 #REF! #REF! #REF! #REF!
i Rate per 11 to 12.00 m depth from GL Err:509 9.00 #REF! #REF! #REF! #REF!
j Rate per 12 to 13.00 m depth from GL Err:509 10.00 #REF! #REF! #REF! #REF!
k Rate per 13 to 14.00 m depth from GL Err:509 11.00 #REF! #REF! #REF! #REF!
l Rate per 14 to 15.00 m depth from GL Err:509 12.00 #REF! #REF! #REF! #REF!
m Rate per 15 to 16.00 m depth from GL Err:509 13.00 #REF! #REF! #REF! #REF!
n Rate per 16 to 17.00 m depth from GL Err:509 14.00 #REF! #REF! #REF! #REF!
o Rate per 17 to 18.00 m depth from GL Err:509 15.00 #REF! #REF! #REF! #REF!
p Rate per 18 to 19.00 m depth from GL Err:509 16.00 #REF! #REF! #REF! #REF!
q Rate per 19 to 20.00 m depth from GL Err:509 17.00 #REF! #REF! 0.0 #REF!

ii Vertical walls of circular faces for Intake well with extra lifts above Ground Level
a Rate per up to 3 m height above GL 250 mm
M-30 GRADE OF MIX 1.00 Cum Err:509 1 Cum Err:509
Lifting of cement concrete for RCC elevated 1.00 Cum #REF! 1 Cum #REF!
reservoir. For every 1m height or part thereof over
the initial lift of 3 m ( item 32. a. of PH SSR - Pg.8 )

Basic Cost No. of Lift charges OH& CP VAT & Total


A Height of RCC M-30 -wall from Ground Level Lifts @ LC
#REF! 14% #REF!
a Rate per 3 to 4.00 m Height from GL Err:509 1.00 #REF! #REF! #REF! #REF!
b Rate per 4 to 5.00 m Height from GL Err:509 2.00 #REF! #REF! #REF! #REF!
c Rate per 5 to 6.00 m Height from GL Err:509 3.00 #REF! #REF! #REF! #REF!
d Rate per 6 to 7.00 m Height from GL Err:509 4.00 #REF! #REF! #REF! #REF!
447524687.xlsx - data-Road
e Rate per 7 to 8.00 m Height from GL Page 1668Err:509
of 2191 5.00 #REF! #REF! #REF! #REF!
f Rate per 8 to 9.00 m Height from GL Err:509 6.00 #REF! #REF! #REF! #REF!
g Rate per 9 to 10.00 m Height from GL Err:509 7.00 #REF! #REF! #REF! #REF!
h Rate per 10 to 11.00 m Height from GL Err:509 8.00 #REF! #REF! #REF! #REF!
i Rate per 11 to 12.00 m Height from GL Err:509 9.00 #REF! #REF! #REF! #REF!
j Rate per 12 to 13.00 m Height from GL Err:509 10.00 #REF! #REF! #REF! #REF!
k Rate per 13 to 14.00 m Height from GL Err:509 11.00 #REF! #REF! #REF! #REF!
l Rate per 14 to 15.00 m Height from GL Err:509 12.00 #REF! #REF! #REF! #REF!
m Rate per 15 to 16.00 m Height from GL Err:509 13.00 #REF! #REF! #REF! #REF!
n Rate per 16 to 17.00 m Height from GL Err:509 14.00 #REF! #REF! #REF! #REF!
o Rate per 17 to 18.00 m Height from GL Err:509 15.00 #REF! #REF! #REF! #REF!
p Rate per 18 to 19.00 m Height from GL Err:509 16.00 #REF! #REF! #REF! #REF!
q Rate per 19 to 20.00 m Height from GL Err:509 17.00 #REF! #REF! #REF! #REF!

17 BLD-CSTN-3-14-(31)-C: Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using WEIGH
BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved
quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement
content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering,
laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item
of work. for RCC SLABS, BEAMS

M-30 GRADE OF MIX


a Mateial
cement (ENC-PH.Memo.No.146/Cement & Steel 400.00 Kg 4.60 1 Kg 1840.00
/T1)
20mm HBG graded metal (Lead statement-S.N.47) 0.800 Cum Err:509 1 Cum Err:509

Sand ( Lead statement-S.N.2 ) 0.400 Cum 1303.00 1 Cum 521.20


Err:509
b Labour
Mason 1st class (labour-Irrigation.S.N.11) 0.067 No 564.00 1 No 37.79
2nd Class Mason (labour-Irrigation.S.N.35) 0.133 No 540.00 1 No 71.82
Mazdoor (Both Men & Women) (Labour-Irrigation- 3.077 No 510.00 1 No 1569.27
Unskilled-S.N.3)
1678.88
c Machinary
Weigh Batcher Hire charges (Machine mixing) 0.308 hour 608.10 1 hour 187.29
charges ( Hire
Vibrator hire -Irrigation-S.N.19-
charges Concrete
( Hire -irrigation -41) mixer) 0.308 hour 205.00 1 hour 63.14
250.43
Water (including for curing) -M-189- SSR- irrigation 1.200 Kl 98.00 1 Kl 117.60
items
BASIC COST per 1 cum Rs Err:509

A RCC M 30 Slabs up to 3.66 Mts height


a RCC M 30 Slabs up to 3.66m Height & Thickness of 150 mm
Cost of M- 30 grade mix 1.000 Cum Err:509 1 Cum Err:509
Centering charges ,Pg No. 106 to 108 of Bld. Items 6.670 Sqm 236.00 1 Sqm 1574.12
Labour charges,Pg No. 106 to 108 of Bld. Items 6.670 Sqm 215.00 1 Sqm 1434.05
Add Labour component @ 20% 286.81
Rs Err:509
Overheads & Contractors Profit 14% Err:509
Total Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum Rs Err:509

b RCC M 30 Slabs up to 3.66m Height & Thickness of 200 mm


Cost of M- 30 grade mix 1.00 Cum Err:509 1 Cum Err:509
Centering charges ,Pg No. 106 to 108 of Bld. Items 5.000 Sqmt. 236.00 1 Sqmt. 1180.00
Labour charges,Pg No. 106 to 108 of Bld. Items 5.000 Sqm 215.00 1 Sqm 1075.00
447524687.xlsx - data-Road
Add Labour component @ 20%
Page 1669 of 2191 215.00
Rs Err:509
Overheads & Contractors Profit 14% Err:509
Total Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum Rs Err:509

B RCC M 30 Slabs up to 7.32Mts height


a RCC M 30 Slabs up to 7.32m Height & Thickness of 150 mm
Cost of M- 30 grade mix 1.000 Cum Err:509 1 Cum Err:509
Centering charges ,Pg No. 106 to 108 of Bld. Items 6.670 Sqm Err:509 1 Sqm Err:509
Labour charges,Pg No. 106 to 108 of Bld. Items 6.670 Sqm Err:509 1 Sqm Err:509
Add Labour component @ 20% Err:509
Rs Err:509
Overheads & Contractors Profit 14% Err:509
Total Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum Rs Err:509

b RCC M 30 Slabs up to 7.32m Height & Thickness of 200 mm


Cost of M- 30 grade mix 1.00 Cum Err:509 1 Cum Err:509
Centering charges ,Pg No. 106 to 108 of Bld. Items 5.000 Sqmt. Err:509 1 Sqmt. Err:509
Labour charges,Pg No. 106 to 108 of Bld. Items 5.000 Sqm Err:509 1 Sqm Err:509
Add Labour component @ 20% Err:509
Rs Err:509
Overheads & Contractors Profit 14% Err:509
Total Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum Rs Err:509

C RCC M 30 Slabs up to 10 Mts height (Ovserved data)


c RCC M 30 Slabs up to 10.00 m Height & Thickness of 150 mm
Rate per One Cum for 7.32m height 1.00 Cum Err:509
Add for extra height at 16.666% on every 0.610m 4.393 16.67% = 73%
height above 7.32m
Add 73% on Centering Charges i.e Err:509 73% Err:509
Add 73% on Labour Charges i.e Err:509 73% Err:509
Err:509
Rate per One Cum 0% Err:509
Rate per One Cum for 10.00m height Rs Err:509

d RCC M 30 Slabs up to 10.00 m Height & Thickness of 200 mm


Rate per One Cum for 7.32m height 1.00 Cum Err:509
Add for extra height at 16.666% on every 0.610m 4.393 16.67% = 73%
height above 7.32m
Add 73% on Centering Charges i.e Err:509 73% Err:509
Add 73% on Labour Charges i.e Err:509 73% Err:509
Err:509
Rate per One Cum for 10.00m height 0% Err:509
Rate per One Cum for 10.00m height Rs Err:509

D RCC M 30 Slabs up to 15.00 Mts height


a RCC M 30 Slabs up to 15.00m Height & Thickness of 150 mm
Cost of M- 30 grade mix 1.000 Cum Err:509 1 Cum Err:509
Centering charges ,Pg No…...,31.a (ELSR ) up to 6.670 Sqm 3953.00 1 Sqm 26366.51
15m
Rs Err:509
Overheads & Contractors Profit 14% Err:509
Total Err:509
VAT & labour cess etc,. 0% Err:509

447524687.xlsx - data-Road
Rate per One Cum Page 1670 of 2191 Rs Err:509

b RCC M 30 Slabs up to 15.00m Height & Thickness of 200 mm


Cost of M- 30 grade mix 1.00 Cum Err:509 1 Cum Err:509
Centering charges ,Pg No…..,31.a (ELSR ) 5.000 Sqmt. 3953.00 1 Sqmt. 19765.00
Rs Err:509
Overheads & Contractors Profit 14% Err:509
Total Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum Rs Err:509

DATA FOR FOOT BRIDGES


18 BLD-CSTN-3-14-(31)-A: Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using
WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from
approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement
content as per IS code . for FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth)

M-20 GRADE OF MIX


Material
cement (ENC-PH.Memo.No.146/Cement &Steel / 350.00 Kg 4.60 1 Kg 1610.00
T1)
20mm HBG graded metal (Lead statement-S.N.47) 0.800 Cum Err:509 1 Cum Err:509

Sand ( Lead statement-S.N.2 ) 0.400 Cum 1303.00 1 Cum 521.20


Err:509
Labour
Mason 1st class (labour-Irrigation.S.N.11) 0.133 Nos. 564.00 1 Each 75.01
2nd Class Mason (labour-Irrigation.S.N.35) 0.267 Nos. 540.00 1 Each 144.18
Mazdoor (Both Men & Women) (Labour-Irrigation- 4.600 Nos. 510.00 1 Each 2346.00
Unskilled-S.N.3)
2565.19
Machinary
Weigh Batcher Hire charges (Machine mixing) 1.333 hour 608.10 1 hour 810.60
charges ( Hire -Irrigation-S.N.19- Concrete mixer)
Vibrator hire charges ( Hire -irrigation -41) 1.333 hour 205.00 1 hour 273.27
1083.87
Water (including for curing) -M-189- SSR- irrigation 1.20 Kl 98.00 1 Kl 117.60
items BASIC COST per 1 cum Rs Err:509

a for Footings
R.C.C. M 20 Per Cum 1.00 Cum Err:509 1 Cum Err:509
Centering charges ,Pg No. 106 to 108 of Bld. Items 1.00 Cum 288.00 1 Cum 288.00

Labour charges,Pg No. 106 to 108 of Bld. Items 1.00 Cum 631.00 1 Cum 631.00
Add Labour component @ 20% 126.20
Err:509
Overheads & Contractors Profit 14% Err:509
Err:509
VAT & labour cess etc,. 0% Err:509
Rate per 1 Cum Rs Err:509

b Pedastals
R.C.C. M 20 Per Cum 1.00 Cum Err:509 1 Cum Err:509
Centering charges ,Pg No. 106 to 108 of Bld. Items 1.00 Cum 328.00 1 Cum 328.00
Labour charges,Pg No. 106 to 108 of Bld. Items 1.00 Cum 1004.00 1 Cum 1004.00
Add Labour component @ 20% 200.80
Sub - Total Err:509
Overheads & Contractors Profit 14% Err:509
Err:509

447524687.xlsx - data-Road
VAT & labour cess etc,. 0%
Page 1671 of 2191 Err:509
Rate per One Cum Rs Err:509

c Plinth beams
R.C.C. M 20 Per Cum 1.00 Cum Err:509 1 Cum Err:509
Centering charges ,Pg No. 106 to 108 of Bld. Items 1.00 Cum 1390.00 1 Cum 1390.00

Labour charges,Pg No. 106 to 108 of Bld. Items 1.00 Cum 1521.00 1 Cum 1521.00
Add Labour component @ 20% 304.20
Sub - Total Err:509
Overheads & Contractors Profit 14% Err:509
Err:509
VAT & labour cess etc,. 0% Err:509
Total Err:509
Rate per One Cum Rs Err:509

19 BLD-CSTN-3-14-(31)-B: Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using
WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from
approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement
content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS

M-20 GRADE OF MIX


Mateial
cement(ENC-PH.Memo.No.146/Cement & Steel / 350.00 Kg 4.60 1 Kg 1610.00
T1)
20mm HBG graded metal (Lead statement-S.N.47) 0.800 Cum Err:509 1 Cum Err:509

Sand ( Lead statement-S.N.2 ) 0.400 Cum 1303.00 1 Cum 521.20


Err:509
Labour
Mason 1st class (labour-Irrigation.S.N.11) 0.167 Nos. 564.00 1 Each 94.19
2nd Class Mason (labour-Irrigation.S.N.35) 0.167 Nos. 540.00 1 Each 90.18
Mazdoor (Both Men & Women) (Labour-Irrigation- 5.600 Nos. 510.00 1 Each 2856.00
Unskilled-S.N.3)
3040.37
Machinary
Weigh Batcher Hire charges (Machine mixing) 1.333 hour 608.10 1 hour 810.60
charges ( Hire -Irrigation-S.N.19- Concrete mixer)

Vibrator hire charges ( Hire -irrigation -41) 1.333 hour 205.00 1 hour 273.27
1083.87
Water (including for curing) -M-189- SSR- irrigation 1.20 Kl 98.00 1 Kl 117.60
items
BASIC COST per 1 cum Rs Err:509

a Columns up to 3.66 Mts unsupported height above GL


R.C.C. M 20 Per Cum 1.00 Cum Err:509 1 Cum Err:509
Material charges for Centering & Scaffolding, Pg 1.00 Cum 355.00 1 Cum 355.00
No. 106 to 108 of Bld. Items (Steel scaffolding)
Labour charges for Centering & Scaffolding,Pg No. 1.00 Cum 2268.00 1 Cum 2268.00
106 to 108 of Bld. Items
Add Labour component @ 20% 453.60
Basic Cost Rs Err:509
Overheads & Contractors Profit 14% Err:509
Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum Rs Err:509

b Columns 4.00m unsupported height above GL

447524687.xlsx - data-Road
Rate per One Cum for 3.66m height 1.00 Cum
Page 1672 of 2191 Err:509
Add for extra height at 16.666% on every 0.610m 0.557 16.67% = 9.30%
height above 3.66m
Add 0.093 on Centering Charges i.e 355.00 9.30% 33.02
Add 0.093 on Centering Charges i.e 2268.00 9.30% 210.92
Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum for 4.00m height Rs Err:509

c Columns 5.00m unsupported height above GL


Rate per One Cum for 3.66m height 1.00 Cum Err:509
Add for extra height at 16.666% on every 0.610m 2.197 16.67% = 36.6%
height above 3.66m
Add 0.366 on Centering Charges i.e 355.00 36.60% 129.93
Add 0.366 on Centering Charges i.e 2268.00 36.60% 830.09
Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum for 5.00m height Rs Err:509

d Columns 7.32m unsupported height above GL


Rate per One Cum for 3.66m height 1.00 Cum Err:509 1 Cum Err:509
Material charges for Centering & Scaffolding, Pg 1.00 Cum Err:509 1 Cum Err:509
No. 106 to 108 of Bld. Items (Steel scaffolding)
Labour charges for Centering & Scaffolding,Pg No. 1.00 Cum Err:509 1 Cum Err:509
106 to 108 of Bld. Items
Add Labour component @ 20% Err:509
Err:509
Overheads & Contractors Profit 14% Err:509
Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum for 7.32m height Rs Err:509

e Columns 10.00 m unsupported height above GL (Ob.data)


Rate per One Cum for 7.32m height 1.00 Cum Err:509 1 Cum Err:509
Add for extra height at 16.666% on every 0.610m 4.393 16.67% = 73.2%
height above 7.32m
Add 0.732 on Centering Charges i.e Err:509 73.20% Err:509
Add 0.732 on Centering Charges i.e Err:509 73.20% Err:509
Err:509
Add Labour component @ 20% Err:509
Err:509
Overheads & Contractors Profit 14% Err:509
Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum for 10.00m height Rs Err:509

f Columns up to 15.00 m. 0.23 0.45 m size 9.66 Sqm 1.36


R.C.C. M 20 Per Cum 1.00 Cum Err:509 1 Cum Err:509
Centering charges ,Pg No.340 of Bld.SSR for 13.14 Sqm 1332.00 1 Sqm 17499.28
ELSRs Basic Cost Rs Err:509
Overheads & Contractors Profit 14% Err:509
Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum Rs Err:509

Rate for extra Heights


g Columns from 15.00 m. to 18.00m 0.23 0.45 m size 9.66 Sqm 1.36m
R.C.C. M 20 Per Cum 1.00 Cum Err:509 1 Cum Err:509

447524687.xlsx - data-Road
Centering charges ,Pg No.340 of Bld.SSR for 1673 of13.14
Page 2191 sqm 1332.00 1 Cum 17499.28
ELSRs
Add for extra height 9.0% 1574.94
Basic Cost Rs Err:509
Overheads & Contractors Profit @ 14% 14.00% Err:509
Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum Rs Err:509

h Lintels up to 3.66 Mts unsupported height above GL


R.C.C. M 20 Per Cum 1.00 Cum Err:509 1 Cum Err:509
Centering charges ,Pg No. 106 to 108 of Bld. Items 1.00 Cum 1180.00 1 Cum 1180.00

Labour charges,Pg No. 106 to 108 of Bld. Items 1.00 Cum 1615.00 1 Cum 1615.00
Add Labour component @ 20% 323.00
Sub - Total Rs Err:509
Overheads & Contractors Profit 14% Err:509
Err:509
VAT & labour cess etc,. 0% Err:509
Total Err:509
Rate per One Cum Rs Err:509

i Lintels up to 7.32 Mts unsupported height above GL


M-20 GRADE OF MIX 1.00 Cum Err:509 1 Cum Err:509
Centering charges ,Pg No. 106 to 108 of Bld. Items 1.00 Cum Err:509 1 Cum Err:509

Labour charges,Pg No. 106 to 108 of Bld. Items 1.00 Cum Err:509 1 Cum Err:509
Add Labour component @ 20% Err:509
Sub - Total Rs Err:509
Overheads & Contractors Profit 14% Err:509
Err:509
VAT & labour cess etc,. 0% Err:509
Total Err:509
Rate per One Cum Rs Err:509

20 BLD-CSTN-3-14-(31)-C : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using
WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from
approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement
content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering,
laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item
of work. for RCC SLABS, BEAMS

M-20 GRADE OF MIX


Mateial
cement (ENC-PH.Memo.No.146/Cement &Steel 350.00 Kg 4.60 1 Kg 1610.00
/T1)
20mm HBG graded metal (Lead statement-S.N.47) 0.800 Cum Err:509 1 Cum Err:509

Sand ( Lead statement-S.N.2 ) 0.400 Cum 1303.00 1 Cum 521.20


Err:509
Labour
Mason 1st class (labour-Irrigation.S.N.11) 0.067 No 564.00 1 No 37.79
2nd Class Mason (labour-Irrigation.S.N.35) 0.133 No 540.00 1 No 71.82
Mazdoor (Both Men & Women) (Labour-Irrigation- 3.077 No 510.00 1 No 1569.27
Unskilled-S.N.3)
1678.88
Machinary
Weigh Batcher Hire charges (Machine mixing) 0.308 hour 608.10 1 hour 187.29
charges ( Hire -Irrigation-S.N.19- Concrete mixer)

447524687.xlsx - data-Road
Vibrator hire charges ( Hire -irrigation -41) Page 1674 of0.308
2191 hour 205.00 1 hour 63.14
250.43
Water (including for curing) -M-189- SSR- irrigation 1.200 Kl 98.00 1 Kl 117.60
items
BASIC COST per 1 cum Rs Err:509

I RCC Slabs for Pump Room


A RCC M 20 Slabs of 125mm thick

a RCC M 20 Slabs up to 3.66m Height & Thickness of 125 mm


Cost of M- 20 grade mix 1.000 Cum Err:509 1 Cum Err:509
Centering charges ,Pg No. 106 to 108 of Bld. Items 8.000 Sqm 236.00 1 Sqm 1888.00

Labour charges,Pg No. 106 to 108 of Bld. Items 8.000 Sqm 215.00 1 Sqm 1720.00
Add Labour component @ 20% 344.00
Rs Err:509
Overheads & Contractors Profit 14% Err:509
Total Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum for 3.66m height Rs Err:509

b RCC M 20 Slabs at 4.00 Mts height & Thickness of 125 mm


Rate for 4.00m Height
Rate per One Cum for 3.66m height Err:509
Add for extra height at 16.666% on every 0.610m 0.56 16.67% = 9.3%
height above 3.66m
Add 0.093 on Centering Charges i.e 236.00 9.3% 21.95
Add 0.093 on Centering Charges i.e 215.00 9.3% 20.00
Sub - Total Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum for 4.00m height Rs Err:509

c RCC M 20 Slabs at 5.00 Mts height & Thickness of 125 mm


Rate for 5.00m Height
Rate per One Cum for 3.66m height Err:509
Add for extra height at 16.666% on every 0.610m 2.20 16.67% = 36.7%
height above 3.66m
Add 0.367 on Centering Charges i.e 236.00 36.7% 86.61
Add 0.367 on Centering Charges i.e 215.00 36.7% 78.91
Sub - Total Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum for 5.00m height Rs Err:509

d RCC M 20 Slabs at 6.00 Mts height 125 mm


Rate for 6.00m Height
Rate per One Cum for 3.66m height Err:509
Add for extra height at 16.666% on every 0.610m 3.84 16.67% = 64.0%
height above 3.66m
Add 0.64 on Centering Charges i.e 236.00 64.0% 151.04
Add 0.64 on Centering Charges i.e 215.00 64.0% 137.60
Sub - Total Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum for 6.00m height Rs Err:509

e RCC M 20 Slabs up to 7.32m Height & Thickness of 125 mm


Cost of M- 20 grade mix 1.000 Cum Err:509 1 Cum Err:509
Centering charges ,Pg No. 106 to 108 of Bld. Items 8.000 Sqm Err:509 1 Sqm Err:509
Labour charges,Pg No. 106 to 108 of Bld. Items 8.000 Sqm Err:509 1 Sqm Err:509
Add Labour component @ 20% Err:509
Rs Err:509
Overheads & Contractors Profit 14% Err:509
Total Err:509
447524687.xlsx - data-Road
VAT & labour cess etc,. 0%
Page 1675 of 2191 Err:509
Rate per One Cum Rs Err:509

B RCC M 20 Slabs of 175mm thick


a RCC M 20 Slabs up to 3.66m Height & Thickness of 175 mm
Cost of M- 20 grade mix 1.000 Cum Err:509 1 Cum Err:509
Centering charges ,Pg No. 106 to 108 of Bld. Items 5.710 Sqm 243.00 1 Sqm 1387.53
Labour charges,Pg No. 106 to 108 of Bld. Items 5.710 Sqm 222.00 1 Sqm 1267.62
Add Labour component @ 20% 253.52
Rs Err:509
Overheads & Contractors Profit 14% Err:509
Total Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum for 3.66m height Rs Err:509

b RCC M 20 Slabs at 4.00 Mts height & Thickness of 175 mm


Rate for 4.00m Height
Rate per One Cum for 3.66m height Err:509
Add for extra height at 16.666% on every 0.610m 0.56 16.67% = 9.30%
height above 3.66m
Add 0.093 on Centering Charges i.e 243.00 9.3% 22.60
Add 0.093 on Centering Charges i.e 222.00 9.3% 20.65
Sub - Total Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum for 4.00m height Rs Err:509

c RCC M 20 Slabs at 5.00 Mts height & Thickness of 175 mm


Rate for 5.00m Height
Rate per One Cum for 3.66m height Err:509
Add for extra height at 16.666% on every 0.610m 2.20 16.67% = 36.7%
height above 3.66m
Add 0.367 on Centering Charges i.e 243.00 36.7% 89.18
Add 0.367 on Centering Charges i.e 222.00 36.7% 81.47
Sub - Total Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum for 5.00m height Rs Err:509

d RCC M 20 Slabs at 6.00 Mts height 175 mm


Rate for 5.00m Height
Rate per One Cum for 3.66m height Err:509
Add for extra height at 16.666% on every 0.610m 3.84 16.67% = 64%
height above 3.66m
Add 0.64 on Centering Charges i.e 243.00 64.0% 155.52
Add 0.64 on Centering Charges i.e 222.00 64.0% 142.08
Sub - Total Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum for 6.00m height Rs Err:509

e RCC M 20 Slabs up to 7.32m Height & Thickness of 175 mm


Cost of M- 20 grade mix 1.000 Cum Err:509 1 Cum Err:509
Centering charges ,Pg No. 106 to 108 of Bld. Items 5.710 Sqm Err:509 1 Sqm Err:509
Labour charges,Pg No. 106 to 108 of Bld. Items 5.710 Sqm Err:509 1 Sqm Err:509
Add Labour component @ 20% Err:509
Rs Err:509
Overheads & Contractors Profit 14% Err:509
Total Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum Rs Err:509

C RCC M 20 Slabs up to 7.32m Height & Thickness of 200 mm


447524687.xlsx - data-Road
Cost of M- 20 grade mix 1.00 Cum
Page 1676 of 2191 Err:509 1 Cum Err:509
Centering charges ,Pg No. 106 to 108 of Bld. Items 5.000 Sqmt. Err:509 1 Sqmt. Err:509
Labour charges,Pg No. 106 to 108 of Bld. Items 5.000 Sqm Err:509 1 Sqm Err:509
Add Labour component @ 20% Err:509
Rs Err:509
Overheads & Contractors Profit 14% Err:509
Total Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum Rs Err:509

D RCC M 20 Slabs up to 15.00 Mts height


a RCC M 20 Slabs up to 15.00m Height & Thickness of 300 mm
Cost of M- 20 grade mix 1.000 Cum Err:509 1 Cum Err:509
Centering charges ,Pg No.7 -31.a (ELSR ) up to 3.330 Sqm 3953.00 1 Sqm 13163.49
15m Rs Err:509
Overheads & Contractors Profit 14% Err:509
Total Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum Rs Err:509
RCC M 20 Slabs at 18.00m Height & Thickness
b 300 mm
of
Cost of M- 20 grade mix 1.000 Cum Err:509 1 Cum Err:509
Centering charges ,Pg No.240,31.a (ELSR ) up to 3.330 Sqm 3953.00 1 Sqm 13163.49
15m
Centering charges ,Pg No.7 -31.a- 15m to 18m 9% 1184.71
Rs Err:509
Overheads & Contractors Profit 14% Err:509
Total Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum Rs Err:509

RCC M 20 Slabs at 20.00m Height & Thickness


c 300 mm
of
Cost of M- 20 grade mix 1.000 Cum Err:509 1 Cum Err:509
Centering charges ,Pg No.240,31.a (ELSR ) up to 3.330 Sqm 3953.00 1 Sqm 13163.49
15m
Centering charges ,Pg No.7- 31.a- 18m to 21m 15% 1974.52
Rs Err:509
Overheads & Contractors Profit 14% Err:509
Total Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum Rs Err:509

E RCC M 20 Slabs up to 15.00 Mts height


a RCC M 20 Slabs up to 15.00m Height & Thickness of 120 mm
Cost of M- 20 grade mix 1.000 Cum Err:509 1 Cum Err:509
Centering charges ,Pg No.7- 31.a (ELSR ) up to 8.330 Sqm 3953.00 1 Sqm 32928.49
15m Rs Err:509
Overheads & Contractors Profit 14% Err:509
Total Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum Rs Err:509

RCC M 20 Slabs at 18.00m Height & Thickness


b 120 mm
of
Cost of M- 20 grade mix 1.000 Cum Err:509 1 Cum Err:509
Centering charges ,Pg No.240,31.a (ELSR ) up to 8.330 Sqm 3953.00 1 Sqm 32928.49
15m
Centering charges ,Pg No.7 - ,31.a- 15m to 18m 9% 2963.56
Rs Err:509
Overheads & Contractors Profit 14% Err:509
Total Err:509
VAT & labour cess etc,. 0% Err:509
447524687.xlsx - data-Road
Rate per One Cum Page 1677 of 2191 Rs Err:509

RCC M 20 Slabs at 20.00m Height & Thickness


c 120 mm
of
Cost of M- 20 grade mix 1.000 Cum Err:509 1 Cum Err:509
Centering charges ,Pg No.240,31.a (ELSR ) up to 8.330 Sqm 3953.00 1 Sqm 32928.49
15m
Centering charges ,Pg No.7 -31.a- 18m to 21m 15% 4939.27
Rs Err:509
Overheads & Contractors Profit 14% Err:509
Total Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum Rs Err:509

F RCC M 20 Slabs up to 15.00m Height & Thickness of 175 mm


Cost of M- 20 grade mix 1.000 Cum Err:509 1 Cum Err:509
Centering charges ,Pg No.7- 31.a (ELSR ) up to 5.710 Sqm 3953.00 1 Sqm 22571.63
15m Rs Err:509
Overheads & Contractors Profit 14% Err:509
Total Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum Rs Err:509

II RCC Dome Slab


a RCC M 20 Dome Slab up to 3.66m Height
Cost of M- 20 grade mix 1.00 Cum Err:509 1 Cum Err:509
Centering charges ,Pg No. 106 to 108 of Bld. Items 1.00 Cum 3833.00 1 Cum 3833.00
Labour charges,Pg No. 106 to 108 of Bld. Items 1.00 Cum 3496.00 1 Sqm 3496.00
Add Labour component @ 20% 699.20
Rs Err:509
Overheads & Contractors Profit 14% Err:509
Total Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum Rs Err:509

b RCC M 20 Dome Slab up to 7.32m Height


Cost of M- 20 grade mix 1.00 Cum Err:509 1 Cum Err:509
Centering charges ,Pg No. 106 to 108 of Bld. Items 1.00 Cum Err:509 1 Cum Err:509
Labour charges,Pg No. 106 to 108 of Bld. Items 1.00 Cum Err:509 1 Sqm Err:509
Add Labour component @ 20% Err:509
Rs Err:509
Overheads & Contractors Profit 14% Err:509
Total Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum Rs Err:509

III RCC Beams


a RCC M 20 Beams up to 3.66m Height
Cost of M- 20 grade mix 1.00 Cum Err:509 1 Cum Err:509
Centering charges ,Pg No. 106 to 108 of Bld. Items 1.00 Cum 2085.00 1 Sqm 2085.00
Labour charges,Pg No. 106 to 108 of Bld. Items 1.00 Cum 1903.00 1 Sqm 1903.00
Add Labour component @ 20% 380.60
Rs Err:509
Overheads & Contractors Profit 14% Err:509
Total Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum Rs Err:509

b RCC M 20 Beams up to 4.00 Mts height


Rate for 4.00m Height
Rate per One Cum for 3.66m height Err:509
Add for extra height at 16.666% on every 0.610m 0.56 16.67% = 9.3%
height above 3.66m
Add 0.093 on Centering Charges i.e 2085.00 9.3% 193.91
447524687.xlsx - data-Road
Add 0.093 on Centering Charges i.e 1903.00
Page 1678 of 2191 9.3% 176.98
Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum for 4.00m height Rs Err:509

c RCC M 20 Beams up to 5.00 Mts height


Rate for 4.00m Height
Rate per One Cum for 3.66m height Err:509
Add for extra height at 16.666% on every 0.610m 2.20 16.67% = 36.7%
height above 3.66m
Add 0.367 on Centering Charges i.e 2085.00 36.7% 765.20
Add 0.367 on Centering Charges i.e 1903.00 36.7% 698.40
Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum for 5.00m height Rs Err:509

d RCC M 20 Beams up to 6.00 Mts height


Rate for 4.00m Height
Rate per One Cum for 3.66m height Err:509
Add for extra height at 16.666% on every 0.610m 3.84 16.67% = 64.0%
height above 3.66m
Add 0.64 on Centering Charges i.e 2085.00 64.0% 1334.40
Add 0.64 on Centering Charges i.e 1903.00 64.0% 1217.92
Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum for 6.00m height Rs Err:509

e RCC M 20 Beams up to 7.32m Height


Cost of M- 20 grade mix 1.000 Cum Err:509 1 Cum Err:509
Centering charges ,Pg No. 106 to 108 of Bld. Items 1.000 Cum Err:509 1 Sqm Err:509
Labour charges,Pg No. 106 to 108 of Bld. Items 1.000 Cum Err:509 1 Sqm Err:509
Add Labour component @ 20% Err:509
Rs Err:509
Overheads & Contractors Profit 14% Err:509
Total Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum Rs Err:509

f RCC M 20- Beams up to 10.00 m Height (ob. Data)


Rate per One Cum for 7.32 m height 1.000 Cum Err:509 1 Cum Err:509
Add for extra height at 16.666% on every 0.610m 4.39 16.67% = 73.2%
height above 7.32m
Add 0.732 on Centering Charges i.e Err:509 73.2% Err:509
Add 0.732 on Centering Charges i.e Err:509 73.2% Err:509
Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum Rs Err:509

g RCC M 20 Beams up to 12.50 m Height


Rate per One Cum for 7.32 m height 1.000 Cum Err:509 1 Cum Err:509
Add for extra height at 16.666% on every 0.610m 8.49 16.67% = 141.5%
height above 7.32m
Add 1.415 on Centering Charges i.e Err:509 141.5% Err:509
Add 1.415 on Centering Charges i.e Err:509 141.5% Err:509
Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum Rs Err:509

h RCC M 20 Beams at 15m Height 0.23 0.45 m size 9.66 Sqm 1.36m
Cost of M- 20 grade mix 1.00 Cum Err:509 1 Cum Err:509
Centering charges for Columns and Beams ,Pg 13.14 sqm 1332.00 1 Cum 17499.28
No.7-31.a (7) for ELSRs- PH SSR

447524687.xlsx - data-Road
Basic Cost
Page 1679 of 2191 Rs Err:509
Overheads & Contractors Profit @ 14% 14.00% Err:509
Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum Rs Err:509

i RCC M 20 Beams from 15.00 m. to 18.00m 0.23 0.45 m size 9.66 Sqm 1.36m
Rate per One Cum 1.00 Cum Err:509 1 Cum Err:509
Centering charges for Columns and Beams ,Pg 13.14 sqm 1332.00 1 Cum 17499.28
No.7-31.a (7) for ELSRs- PH SSR
Add for extra height 9.0% 1574.94
Basic Cost Rs Err:509
Overheads & Contractors Profit @ 14% 14.00% Err:509
Err:509
VAT & labour cess etc,. 0% Err:509
Rate per One Cum Rs Err:509

IV RCC M20 for Sun shades of 0.60M width, 75mm


th. at fixed end and 50mm th. at free end
a RCC M20 for Sun shades up to 3.66m Height
R.C.C. M 20 Per Cum 0.0625 Cum Err:509 1 Cum Err:509
Centering charges ,Pg No. 106 to 108 of Bld. Items 1.00 Sqm 233.00 1 Sqm 233.00
Labour charges,Pg No. 106 to 108 of Bld. Items 1.00 Sqm 248.00 1 Sqm 248.00
Add Labour component @ 20% 49.60
Rs Err:509
Overheads & Contractors Profit 14% Err:509
Rs Err:509
VAT & labour cess etc,. 0% Err:509
Total Err:509
Rate per One Sqm Rs Err:509

b RCC M20 for Sun shades up to 7.32m Height


R.C.C. M 20 Per Cum 0.0625 Cum Err:509 1 Cum Err:509
Centering charges ,Pg No. 106 to 108 of Bld. Items 1.00 Sqm Err:509 1 Sqm Err:509
Labour charges,Pg No. 106 to 108 of Bld. Items 1.00 Sqm Err:509 1 Sqm Err:509
Add Labour component @ 20% Err:509
Rs Err:509
Overheads & Contractors Profit 14% Err:509
Rs Err:509
RCC M 20 Beams up to 12.50 m Height 0% Err:509
Total Err:509
Rate per One Sqm Rs Err:509

12 BLD-CSTN-8-11-(86): RCM facia 5cm thick in CM (1:3) for drop walls, fins with rabbit wire mesh & nominal
reinforcement as directed by Engineer-in-charge with dubara sponge finishing, including cost & conveyance of all
materials to site, seigniorage charges, sales & other taxes on all materials, operational & incidental, cost and
conveyance of cement, wire mesh, water to work site, centering, scaffolding and form work, lift charges etc.,
complete for finished items of work but excluding cost of steel & its fabrication charges, for finished item of work.
(APSS No.403 & 903)
Unit - 10 sqm
A) MATERIALS
Rabbit wire mesh (1.0 M panna for 0.6 M drop) 13.30 sqm 19.00 1 sqm 252.70
BMT-F.28- Sn-156- Pg.No…... of Bld.SSR.
Cement Mortar 1:3 for 25 mm thick (Mortars-" d ") 0.25 cum 1 cum 969.41
3877.65
Dry Cement for making Lumps 50.00 kg 4.60 1 kg 230.00
12 mm Plastering 2 coats in 1:4 & 1:2 cm both 21.80 sqm 1409.65 10 sqm 3073.04
sides Excluding HYSD Steel/ Mild steel & Binding
wire
B) LABOUR CHARGES
Mason 1st class (labour-Irrigation.S.N.11) 8.00 day 564.00 1 day 4512.00

447524687.xlsx - data-Road
Miller Operator (labour-Irrigation.S.N.16) 1.00 day
Page 1680 of 2191 444.00 1 day 444.00
Mazdoor (irri-Un skilled-Sn.3) 10.00 day 510.00 1 day 5100.00
c) Machinery
Machine Mixing Mortar with Miller - (Hire charges 2.00 Hrs 397.50 1 Hrs 795.00
-Irrigation-S.No.16)
Total Rs 15376.15
over heads & contractors profit 13.615% 2093.46
Grand Total for 10 Sqm 17469.61
Rate per 1 sqm Rs 1746.96
VAT & labour cess etc,. 0% 0.00
Rate per 1 Sqm Rs 1746.96

13 BLD-CSTN-8-1-(76) : Plastering with 12mm thick in single coat in CM (1:3) using Sulphate Resistant Cementm
finished smooth including cost and conveyance of all materials to site, seigniorage charges on all materials,
finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever
necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.

A. MATERIALS:
Cement Mortor (1:3) (Mortars-" d ") 0.150 Cum 3877.65 1 Cum 581.65
B. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11) 0.600 Nos 564.00 1 Nos 338.40
Mazdoor (irri-Un skilled-Sn.3) 0.960 Nos 510.00 1 Nos 489.60
Total A+B 1409.65
C.Overheads & Contractors Profit 13.615% 191.92
Grand Total 1601.57
VAT & labour cess etc,. 0% 0.00
Rate per 10 Sqm Rs 1601.57
Rate for other Floors 1F 2F 3F 4F 5F
Basic rate per 1Cum 1601.57 1601.57 1601.57 1601.57 1601.57
Material Hire Charges for Scaffolding (Pg.No.108- 10.30 10.30 10.30 10.30 10.30
Bld.SSR)
Labour Charges for Scaffolding (Pg.No.108- 79.50 113.80 148.00 182.40 216.70
Bld.SSR)
Add extra over Labour component 15.90 22.76 29.60 36.48 43.34
For Material lift Charges & Labour rate for 39.75 79.50 119.25 159.00
scaffolding above 7.32 M - increase @ 50%
Total 1707.27 1788.18 1868.97 1950.00 2030.91

14 BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of
4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand ,
Water, etc., to site, seigniorage charges, all operational, including charges, labour charges for mixing mortar,
finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished
item of work of uneven surfaces of walls. (External walls)
Unit = 10 sqm
A. MATERIALS:
Base Coat in CM(1:6), 16 mm thick
cement (ENC-PH.Memo.No.146/Cement &Steel 43.00 Kg 4.60 1 Kg 197.80
/T1)
Sand ( Lead statement-S.N.3 ) 0.18 Cum 1493.00 1 Cum 268.74
Top Coat in CM(1:4), 4 mm thick
cement (ENC-PH.Memo.No.146/Cement &Steel 14.50 Kg 4.60 1 Kg 66.70
/T1)
Sand ( Lead statement-S.N.3 ) 0.04 Cum 1493.00 1 Cum 59.72
B. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11) 0.63 day 564.00 1 day 355.32
2nd Class Mason (labour-Irrigation.S.N.35) 1.47 day 540.00 1 day 793.80
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 3.90 day 510.00 1 day 1989.00
Total 3731.08
C.Overheads & Contractors Profit 14% 0.00
3731.08
VAT & labour cess etc,. 0% 0.00
Rate per 10 Sqm Rs 3731.08

Rate for other Floors 1F 2F 3F 4F 5F


447524687.xlsx - data-Road
Basic rate per 1Cum 3731.08
Page 1681 of 2191 3731.08 3731.08 3731.08 3731.08
Material Hire Charges for Scaffolding (Pg.108 of 10.30 10.30 10.30 10.30 10.30
Bld.SSR)
Labour Charges for Scaffolding (Pg.108 of 79.50 113.80 148.00 182.40 216.70
Bld.SSR)
Add extra over Labour component 15.90 22.76 29.60 36.48 43.34
For Material lift Charges & Labour rate for 39.75 79.50 119.25 159.00
scaffolding above 7.32 M - increase @ 50%
Total 3836.78 3917.69 3998.48 4079.51 4160.42

15 BLD-CSTN-8-8-(83) ; Plastering with 20mm thick in single coat in CM (1:3) finished smooth including cost and
conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all
operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for
finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:3) (Mortars-" d ") 0.21 Cum 3877.65 1 Cum 814.31
B. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11) 0.94 Nos 564.00 1 Nos 530.16
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 0.16 Nos 510.00 1 Nos 81.60
Total A+B 1426.07
C.Overheads & Contractors Profit 14% 194.16
Grand Total 1620.23
VAT & labour cess etc,. 0% 0.00
Rate per 10 Sqm Rs 1620.23
Rate for other Floors 1F 2F 3F 4F 5F
Basic rate per 1Cum 1620.23 1620.23 1620.23 1620.23 1620.23
Material Hire Charges for Scaffolding (Pg.108 of 10.30 10.30 10.30 10.30 10.30
Bld.SSR)
Labour Charges for Scaffolding (Pg.108 of 79.50 79.50 79.50 79.50 79.50
Bld.SSR)
Add extra over Labour component 15.90 15.90 15.90 15.90 15.90
For Material lift Charges & Labour rate for 39.75 79.50 119.25 159.00
scaffolding above 7.32 M - increase @ 50%
Total 1725.93 1765.68 1805.43 1845.18 1884.93

16 Suply, delivery and fixing of C.I. heavy weight manhole frame and cover in the roof slab incuding labour charges for
fixing and all incidental and operational charges as directed by the Engineer in Charge..
Weight of C.I. heavy weight manhole frame and 1 Kg 103.820 1 Kg 103.82
cover 90 Kg each( 2 x 90 ) = 180 Kg- rate as per CI
specials vide This data book
Total Rs 103.82
Cost of Man hole frame in Kg Rs 103.82

17 IRR-DAW-2-12: Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N /
sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates including cost of
all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position,
levelling, vibrating, finishing, curing etc.,complete for RCC ornamental parapet consisting of 35 cm x 20 cm kerb,
35 cm x 35 cm x 1 m pillars spaced approximately at 3.5 m apart, 20 cm x 15 cm posts 80 cm height approximately
30 cm c / c with 12.5 cm thick and 35 cm wide coping slab for posts and pillars with top edges of kerb and coping
chamferred or rounded as directed etc., complete ( excluding cost of providing and placing reinforcement steel and
gate ) with initial lead upto 1 km and all lifts. ( Cement content : 300 kg / cum with use of super plasticiser(0.4% by
wt. of cement, CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.44 cum)

Unit 36 Rmt
A. MATERIALS:
Cement mix 2450 kg 4.60 1 kg 11270.00
Cenent for incidentals @ 5 kg / cum 35.00 kg 4.60 1 kg 161.00
Coarse aggregate 20-10 mm ( C-Mat-Sn.47) 3.64 cum Err:509 1 cum Err:509
Coarse aggregate 10-4.75 mm ( C-Mat-Sn.58) 1.96 cum Err:509 1 cum Err:509
Fine aggregate ( screened ) ( C-Mat-Sn.3) 3.08 cum 1493.00 1 cum 4598.44
Super plasticiser - (Irri. SSR. Sn.70, Pg. 14) 9.80 kg #REF! 1 kg #REF!
Use rate of shuttering (rate as per Sub- data) 115.00 sqm Err:509 1 sqm Err:509
Scaffolding of shuttering @ 15% Err:509

447524687.xlsx - data-Road
Sundries 2.00 LS
Page 1682 of 2191 30.00
Err:509
B. MACHINERY:
Concrete mixer 300 / 200 ltr ( ele 8.00 Hour 608.10 1 Hour 4864.80
Needle vibrator 40 mm ( ele ) 8.00 Hour 205.00 1 Hour 1640.00
10 hp pump ( ele ) 0.50 Hour 189.30 1 Hour 94.65
6599.45
C. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11) 2.00 Day 564.00 1 Day 1128.00
work inspector ( Labour - irrigation- Sn. 10 ) 1.00 Day 678.00 1 Day 678.00
mazdoor ( Labour - Irrigation- Un skilled Sn.3)
for batching cement ( cement handling ) 2.00 Day 510.00 1 Day 1020.00
for batching other materials 9.00 Day 510.00 1 Day 4590.00
for loading mortar pans 4.00 Day 510.00 1 Day 2040.00
for laying & packing concrete 2.00 Day 510.00 1 Day 1020.00
for conveying concrete 7.00 Day 510.00 1 Day 3570.00
for curing & miscellaneous 2.00 Day 510.00 1 Day 1020.00
Labour for shuttering ( Rate as per Sub-data) 115.00 sqm 119.16 1 sqm 13703.40
Labour for scaffolding @ 15% 2055.51
30824.91
Total of A+B+C Err:509
D. Add for contractor's profit and overheads on 14% Err:509
(A+B+C) Err:509 Err:509
VAT & labour cess etc,. 0% Err:509
Err:509
Rate per 1 Rmt Err:509

18 RBR-SPST-8: Providing fitting and fixing mild steel railing complete as per drawing and technical specifications
Clause 1208.2 MORD / 1900 & 2703 MORTH.
Unit = Running m
Taking output = 100 m (2 x 50 m span) 100 m
(a) Material
IS MC 100=2.806x1.05=2.946 t 2.946 t 44500 1t 131097.00
MS Flats = 0.964x1.05 =1.012 t 1.01 t 44500 1t 44945.00
MS bars = 0.17x1.05=0.18 t 0.18 t 44500 1t 8010.00
MS bolts, nuts and washers, Sn-55, Pg.13-Irri.SSR 150.00 kg #REF! 1 kg #REF!
(b) Labour
Mate - day
Blacksmith ( Labour-Skilled-Irrigation-Sn.2) 30.00 day 564.00 1 day 16920.00
Mazdoor (Unskilled) 42.80 day 510.00 1 day 21828.00
(c) Add 5 percent of (a) for painting one shop coat 5.00% #REF! #REF!
with red oxide primer and three coats of synthetic
enamel paint.
(d) Add for cost of concrete for fixing vertical post in 1.00% #REF! #REF!
the preformed recess @ 1 per cent of (a)
(e) Add for electricity charges, welding and drilling 1.00% #REF! #REF!
equipment, electrodes and other consumables @ 1
per cent of (a)
#REF!
f&g) Overheads & Contractors Profit 14% #REF!
Cost for 100 m = (a+b+c+d+e+f+g) #REF!
Rate per m = (a+b+c+d+e+f+g)/100 #REF!
VAT & labour cess etc,. 0% #REF!
Rate per Rmt Rs #REF!
Note : A typical drawing for MS railing has been followed for estimate purpose. Rate may be worked out as per
design to be followed
19 Supply and Fixing in position of MS heavy structural steel including cost and conveyance of all material , labour
charges for fabrication and fixing in postion etc,. Complete.

447524687.xlsx - data-Road
Cost of Mild Steel, structural steel, i.e. Page 1683 of 21911 Kg 44.50 1 Kg 44.50
Angles,channels and "I" sections
Transportation of material for 20.00Km lead 1 Kg 371.17 1000 Kg 0.37
Labour charges for fabrication -BMM-V.16 - Sn-936 1 Kg #REF! 1 Kg #REF!
Add Municipal allowence on labour component 20% #REF!
Labour charges for fixing - BMM-V.17 - Sn.937 1 Kg #REF! 1 Kg #REF!
Add Municipal allowence on labour component 20% #REF!
#REF!
over heads & contractors profit 14% #REF!
#REF!
VAT & labour cess etc,. 0% #REF!
Rate per 1 Kg Rs #REF!

20 BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor
1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of
Seigniorage charges on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift
charges , curing charges etc., complete for finished item of work

A. MATERIALS:
Ground moulded size 23x11x7 Cm - (1:6)

Cement 48.00 Kg 4.60 1 Kg 220.80


Bricks traditional size 23 x 11 x 7 cms 2nd class 512 Nos 5.70 1000 Nos 2.92
Fine aggregate (Sand) 0.20 Cum 1303.00 1 Cum 260.60
B. LABOUR:
Mason 1st class 0.24 day. 564.00 1 day. 135.36
Mason 2nd class 0.56 day. 540.00 1 day. 302.40
Mazdoor (unskilled) 1.89 day. 510.00 1 day. 963.90
Total A+B Rs 1885.98
c.Overheads & Contractors Profit 14% 256.78
2142.76
VAT & labour cess etc,. 0% 0.00
Grand Total 2142.76
Rate per One Cum Rs 2142.76

Rate for other Floors 1F 2F 3F 4F 5F


Basic rate per 1Cum 2142.76 2142.76 2142.76 2142.76 2142.76
Material Hire Charges for Scaffolding - Pg.108 44.87 44.87 44.87 44.87 44.87
Labour Charges for Scaffolding - Pg - 108 345.48 494.70 643.87 793.09 942.26
Add extra over Labour component 69.10 98.94 128.77 158.62 188.45
For Material lift Charges & Labour rate for 22.43 44.87 67.30 89.74
scaffolding above 7.32 M - increase @ 50%
Rate per One Cum 2602.20 2803.70 3005.14 3206.64 3408.08

21 Supply and fixing in position of Casuarina Balli Props of size - 4" to 8" dia - 20'-0" Height including fixing in required
position, driving in to the ground up to a depth of 1/4th length of the balli and tying with nylon ropes etc etc, complete
BMC-X.06 : Basic cost Sl.No 964 of Pg No.90 1 No #REF! 1 No #REF!
Add labour charges @ 20% of the balli cost #REF!
Add for Nylon ropes etc @ 5% #REF!
Rate per 1 No #REF!

22 Supply and fixing in position of Casuarina Balli Props - 3" to 4" dia - 12'-0" Height including fixing in required
position, driving in to the ground up to a depth of 1/4th length of the balli and tying with nylon ropes etc etc, complete

BMC-X.07 : Basic cost Sl.No 964 of Pg No.90 1 No #REF! 1 No #REF!


Add labour charges @ 20% of the balli cost #REF!
Add for Nylon ropes etc @ 5% #REF!
Rate per 1 No #REF!

23 Providind sand bags for filling in side the coffer dam


Assuming 30 bags of sand makes 1 Cum of
Bund

447524687.xlsx - data-Road
Filling and Laying in position of Sand Bags in the
Page 1684 of 2191
stipulated places including cost of empty cement
bag, sand, thread, stiching charges and labour
charges with 14%overhead charges and 30 bags #REF! 1 Each #REF!
contractors profits - Irrigation SSR - under
Miscellaneous Items, Sn. 2 of Pg.35

Rate per 1 Cum #REF!


c.Overheads & Contractors Profit 14% #REF!
VAT & labour cess etc,. 0% #REF!
Total for 1 Cum #REF!

24 Observed data based on IRR-CCDW1-8 : Providing and fixing 1.50 m long cold twisted deformed steel Anchor
rods with 0.75m length driven in to the hole drilled in bed rock and remaining length embedded in concrete/ masonry
including cost of all materials, machinary, labour, drilling and cleaning hole, driving Anchore rod, grouting hole with
thick cement slurry etc, with intial lead up to 50m and all lifts.
b Unit - 10 Nos 16 mm dia
A) MATERIALS
16mm dia Steel (including 5% Wastage) 10 Nos of 23.70 Kg 44.50 1 Kg 1054.65
1.50m length ( 10x1.5x1.58) = 23.70 Kg
Drilling of 20mm dia holes by Pneumatic 10 Nos #REF! 1 Nos #REF!
Compressor Sl No.141 Pg No. 19 of R & B SoR
Grouting 20mm dia holes with neat cement slurry 10 Nos #REF! 1 Nos #REF!
Sl No.144 Pg No. 19 of R & B SoR
B) LABOUR CHARGES
Bar Bender ( Labour-Skilled-Irri.SSR, Sn.1) 0.50 day 678.00 1 day 339.00
2nd Class Mason (labour-Irrigation.S.N.35) 0.50 day 540.00 1 day 270.00
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 1.00 day 510.00 1 day 510.00
Rate per 10 Nos Rs #REF!
Rate per 1 Nos Rs #REF!
VAT & Labour cess 0% #REF!
Rate per Each Rs #REF!

25 Providing, erecting triple spur gear type Chain Pulley Block suitable for capacity as below with 6 m lift complete with
load chain and hand chain suitable for above lift, tested to 50% over load as per IS 3832 carrying ISI mark.
3 Tonne Capacity ( Rate as per Maharastra ( MJP 1 No 21841.00 1 No 21841.00
Elec & Mech. CSR-2012-13 - section -4, LF 1-3 )
Erection charges 1 job 291.00 1 job 291.00
22132.00
c.Overheads & Contractors Profit 14% 3013
25145.00
VAT & Labour cess 0% 0.00
Grand Total 25145.00
Rate per Each Rs 25145.00

26 Supply delivery and installation of mannually cleaned Stainless Steel bars ( screening confriming to IS6280 as per
drawing) to fit in 45cms clhanned with 0.6 m depth and angle of screen tto flows with c/c distance of 30mm for
coarse screen and 20mm for fine screen . includiong cost and conveyance of all material installation, transportation
all labour charges, including fabrication charges etc complete and directed by Engineer - in charge

Stainless Steel Tubes, sections, plates, sheets & 1 Kg #REF! 1 Kg #REF!


pipes of all sizes & diameters - 202 Grade - BMT-
F.05, Sn.133 of Bld.SSR
Labour charges for Fabrication of stainless steel 1 Kg #REF! 1 Kg #REF!
railing works using stainless steel welding rods-
BMM-V.18 - Sn.938 of Bld. SSR
Add Municipal allowence on labour component 20% #REF!
Labour charges for fixing Iron Doors, Iron Windows 1 Kg #REF! 1 Kg #REF!
and Window Grills in position - BMM-V.15-866
Add Municipal allowence on labour component 20% #REF!
#REF!
447524687.xlsx - data-Road
over heads & contractors profit 14%
Page 1685 of 2191 #REF!
#REF!
VAT & Labour cess 0% #REF!
Rate per 1 Kg #REF!

27 RBR-FNDN-4 - G: Providing concrete for plain/reinforced concrete in open foundations using 20 mm nominal size
Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing
for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500,
1700 & 2100 MORTH.
R.C.C. grade M 35 Design Mix using 20 mm Graded Metal (MORTH 12.8.H)
Case 1 : Using Concrete Mixer
Unit = cum
(a) Material
Cement 0.422 MT 4600.00 1 MT 1941.20
Coarse sand ( C-mat- Sn.2) 0.45 cum 1303.00 1 cum 586.35
20 mm aggregate ( C-mat- Sn.55) 0.54 cum Err:509 1 cum Err:509
10 mm aggregate ( C-mat- Sn.53) 0.36 cum Err:509 1 cum Err:509
(b) Labour
Mate - day
Mason (1st Class) 0.10 day 564.00 1 day 56.40
Mazdoor (Unskilled) 1.39 day 510.00 1 day 708.90
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity 0.40 hour 397.50 1 hour 159.00
Generator 33 KVA 0.40 hour 1007.20 1 hour 402.88
Total of a+b+c Err:509
(d) Formwork @ 3% on (a+b+c) 3.00% Err:509
Err:509
e&f) Overheads & Contractors Profit 14% Err:509
Cost for 1 Cum = a+b+c+d+e+f Err:509
VAT & Labour cess 0% Err:509
Rate per Cum Rs Err:509

28 RBR-FNDN-11: Providing and Laying Cutting Edge of Mild Steel weighing 40 kg per metre for Well Foundation
complete as per Drawing and Technical Specification 1204, 1900 MORTH.
Unit = 1 MT
Taking output = 1 MT
a) Material
Structural steel in plates, angles, etc including 5 per 1.05 MT 44500.00 1 MT 46725.00
cent wastage
Nuts & bolts ( MS- Sl No.55 of Pg 13 -irrigation 20.00 Kg #REF! 1 Kg #REF!
items)
b) Labour
(for cutting, bending, making holes, joining, welding
and erecting in position)
Mate - day
Fitter ( S.N. 6 of Irrigation labour) 5.50 day 648.00 1 day 3564.00
Blacksmith ( S.N. 2 of Irrigation labour) 5.50 day 564.00 1 day 3102.00
Welder ( S.N. 41 of Irrigation labour) 5.50 day 600.00 1 day 3300.00
Mazdoor (Unskilled) 17.82 day 510.00 1 day 9088.20
Electrodes, cutting gas and other consumables @ 4672.5
10 per cent of cost of (a) above
Handling loading and unloading on (a) RBR-LUCC-5 1.05 MT 155.14 1 MT 162.90
Hire charges of Welding machine on (a) (irr-Hire- 20.00 hour 122.40 1 hour 2448.00
66)
Total Rs #REF!
Overheads & Contractors Profit 14% #REF!
Grand Total #REF!
VAT & Labour cess 0% #REF!
Rate per MT Rs #REF!

447524687.xlsx - data-Road
29 RBR-FNDN-12 A-iii : Plain/Reinforced Cement Concrete,
Page 1686 ofin2191
Well Foundation complete as per Drawing and Technical
Specification 1200, 1500 & 1700 MORTH. For Well Curb
Unit = 1 cum
Taking output = 1 cum
RCC M35 Grade
Same as for 4(H) except for formwork which shall
be@ 20 per cent of the cost of concrete instead of
3.0
Caseper1 cent.
: Using Concrete Mixer /Batching plant
as per Item. No.32 rate per Cum- Basic Cost of 1.00 cum Err:509 1 cum Err:509
Labour, Material & Machinery (a+b+c)
d) formwork @ 20 per cent of the cost of 20.00% Err:509
concrete Err:509
Overheads & Contractors Profit 14% Err:509
Grand Total Err:509
VAT & Labour cess 0% Err:509
Rate per Rmt Rs Err:509

30 RBR-FNDN-12 B-VIII: Plain/Reinforced Cement Concrete, in Well Foundation complete as per Drawing and
Technical Specification 1200, 1500 & 1700 MORTH. For Well Staining
Unit = 1 cum
Taking out put = 1 cum
RCC M35 Grade
Same as for 4 (H) except for formwork which shall
be @ 10 per cent of the cost of concrete instead of
3 per cent
Case 1 : Using Concrete Mixer /Batching plant

as per Item. No.32 rate per Cum- Basic Cost of 1.00 cum Err:509 1 cum Err:509
Labour, Material & Machinery (a+b+c)
d) formwork @ 20 per cent of the cost of 10.00% Err:509
concrete Err:509
Overheads & Contractors Profit 14% Err:509
Grand Total Err:509
VAT & Labour cess 0% Err:509
Rate per Rmt Rs Err:509

31 RBR-FNDN-12 C - iv : Plain/Reinforced Cement Concrete, in Well Foundation complete as per Drawing and
Technical Specification 1200, 1500 & 1700 MORTH. for Bottom Plug
Case 1 : Using Concrete Mixer
Unit = 1 cum - PCC Grade M35 Design Mix
Taking output = 15 cum
a) Material
Cement 6.29 MT 4600.00 1 MT 28934.00
Coarse sand 6.75 cum 1303.00 1 cum 8795.25
40 mm Aggregate 5.40 cum 1256.20 1 cum 6783.48
20 mm Aggregate 5.40 cum Err:509 1 cum Err:509
10 mm Aggregate 2.70 cum Err:509 1 cum Err:509
Admixture -(M-180) - Pg.34 of Irri-SoR 21.60 Kg #REF! 1 Kg #REF!
b) Labour
Mate - day
Mason 1.50 day 564.00 1 day 846.00
Mazdoor (Unskilled) 20.90 day 510.00 1 day 10659.00
c) Machinery
Concrete mixer (cap. 0.40/0.28 cum) 6.00 hour 397.50 1 hour 2385.00
Generator 33 KVA 6.00 hour 1007.20 1 hour 6043.20
Light Crane of 3 tonnes capacity for handling 6.00 hour 394.24 1 hour 2365.44
tremie pipe ( Hire-R&B - Sn.34)
Add 5 per cent of cost of material and labour Err:509
towards cost of forming sump, protective bunds,
chiselling and making arrangements for under
water concreting with tremie pipe.
Err:509
447524687.xlsx - data-Road
Overheads & Contractors Profit 14%
Page 1687 of 2191 Err:509
Err:509
VAT & Labour cess 0% Err:509
cost of 15 cum = a+b+c+d+e Err:509
Rate per cum = (a+b+c+d+e)/15 Rs Err:509

32 RBR-FNDN-12 F - iv : Plain/Reinforced Cement Concrete, in Well Foundation complete as per Drawing and
Technical Specification 1200, 1500 & 1700 MORTH. for Well Cap
Case 1 : Using Concrete Mixer
Unit = 1 cum - PCC Grade M35 Design Mix
Taking output = 15 cum
a) Material
Cement 6.33 MT 4600.00 1 MT 29118.00
Coarse sand 6.75 cum 1303.00 1 cum 8795.25
20 mm Aggregate 8.10 cum Err:509 1 cum Err:509
10 mm Aggregate 5.40 cum Err:509 1 cum Err:509
b) Labour
Mate - day 0.00
Mason 1.50 day 564.00 1 day 846.00
Mazdoor (Unskilled) 20.86 day 510.00 1 day 10638.60
c) Machinery
Concrete mixer (cap. 0.40/0.28 cum) 6.00 hour 397.50 1 hour 2385.00
Generator 33 KVA 6.00 hour 1007.20 1 hour 6043.20
Err:509
Formwork @ 3 per cent of (a+b+c) 3.00% Err:509
Err:509
d&e) Overheads & Contractors Profit 14% Err:509
Err:509
VAT & Labour cess 0% Err:509
cost of 15 cum = a+b+c+d+e Err:509
Rate per cum = (a+b+c+d+e)/15 Rs Err:509

33 RBR-FNDN-13 : A : Sinking of 6 m external diameter well (other than pneumatic method of sinking) through all types
of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical
specifications 1207 MORTH. Depth of sinking is reckoned from bed level.
Note : To arrive proportionate quantities keeping
the cross sectional area & depth (22/7xd2xh) for
lesser diametre wells than 6m
Unit = Running Meter.
Taking output = 1 m
Diameter of well - 6 m.
Sandy Soil
a Depth below bed level upto 3.0 M
Rate of sinking = 0.50 m per hour.
a) Labour
Mate - day
Sinker ( skilled ) ( R&B - Labour-Skilled-Sn.13) 1.00 day 678.00 1 day 678.00
Sinking helper( semi-skilled ) ( Irri- Labour-S.S- 2.12 day 540.00 1 day 1144.80
Sn.4)
b) Machinery
Hire & running charges of crane with grab bucket of 2.00 hour 2419.20 1 hour 4838.40
0.75 cum capacity and accessories.( R&B-Sn.35-d)
Consumables in sinking @10 per cent of (b) 10.00% 483.84
7145.04
Overheads & Contractors Profit 1000.31
Grand Total 8145.35
VAT & Labour cess 0% 0.00
Rate per Rmt Rs 8145.35

b Beyond 3m upto 10m depth


Rate of sinking = 0.33 m per hour.
a) Labour
Mate - day
447524687.xlsx - data-Road
Sinker 1.25 day
Page 1688 of 2191 678.00 1 day 847.50
Sinking helper ( semi-skilled ) 2.65 day 540.00 1 day 1431.00
b) Machinery
Hire & running charges of crane with grab bucket of 3.00 hour 2419.20 1 hour 7257.60
0.75 cum capacity and accessories.
Consumables in sinking @10 per cent of (b) 10.00% 725.76
10261.86
Overheads & Contractors Profit 1436.66
Grand Total 11698.52
VAT & Labour cess 0% 0.00
Rate per Rmt Rs 11698.52

c Beyond 10m upto 20m


a. Add 5 percent for every additional meter depth
of sinking over the rate of sinking for the previous
meter -(RBR-FNDN-13-A-iii-a)
Rate per Rmt
Depth Range - 10 to 11.00 m 11698.52 1.05 12283.45
Depth Range - 11 to 12.00 m 12283.45 1.05 12897.62
Depth Range - 12 to 13.00 m 12897.62 1.05 13542.50
Depth Range - 13 to 14.00 m 13542.50 1.05 14219.63
Depth Range - 14 to 15.00 m 14219.63 1.05 14930.61
Depth Range - 15 to 16.00 m 14930.61 1.05 15677.14
Depth Range - 16 to 17.00 m 15677.14 1.05 16461.00
Depth Range - 17 to 18.00 m 16461.00 1.05 17284.05
Depth Range - 18 to 19.00 m 17284.05 1.05 18148.25
Depth Range - 19 to 20.00 m 18148.25 1.05 19055.66

34 in accordance with RBR-FNDN-13 : A : Sinking of 5.10 m external diameter well (other than pneumatic method of
sinking) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as
per drawing and technical specifications 1207 MORTH. Depth of sinking is reckoned from bed level.
Note : To arrive proportionate quantities keeping
the cross sectional area & depth (22/7xd2xh) for
lesser diametre wells than 6m
Unit = Running Meter.
Taking output = 1 m
Diameter of well - 5.1 m. 5.10 m dia
Sandy Soil
a Depth below bed level upto 3.0 M
Rate of sinking = 0.50 m per hour.
a) Labour
Mate - day
Sinker ( skilled ) 0.85 day 678.00 1 day 576.30
Sinking helper ( semi-skilled ) 1.80 day 540.00 1 day 972.00
b) Machinery
Hire & running charges of crane with grab bucket of 1.70 hour 2419.20 1 hour 4112.64
0.75 cum capacity and accessories.
Consumables in sinking @10 per cent of (b) 10.00% 411.26
6072.20
Overheads & Contractors Profit 850.11
Grand Total 6922.31
VAT & Labour cess 0% 0.00
Rate per Rmt Rs 6922.31

b Beyond 3m upto 10m depth 5.10 m dia


Rate of sinking = 0.33 m per hour.
a) Labour
Mate - day
Sinker 1.06 day 678.00 1 day 718.68
Sinking helper ( semi-skilled ) 2.25 day 540.00 1 day 1215.00
b) Machinery
Hire & running charges of crane with grab bucket of 2.55 hour 2419.20 1 hour 6168.96
0.75 cum capacity and accessories.
447524687.xlsx - data-Road
Consumables in sinking @10 per cent of (b) Page 168910.00%
of 2191 616.9
8719.54
Overheads & Contractors Profit 1220.74
Grand Total 9940.28
VAT & Labour cess 0% 0.00
Rate per Rmt Rs 9940.28

c Beyond 10m upto 20m


a. Add 5 percent for every additional meter depth
of sinking over the rate of sinking for the previous
meter -(RBR-FNDN-13-A-iii-a)
Rate per Rmt
Depth Range - 10 to 11.00 m 9940.28 1.05 10437.29
Depth Range - 11 to 12.00 m 10437.29 1.05 10959.15
Depth Range - 12 to 13.00 m 10959.15 1.05 11507.11
Depth Range - 13 to 14.00 m 11507.11 1.05 12082.47
Depth Range - 14 to 15.00 m 12082.47 1.05 12686.59
Depth Range - 15 to 16.00 m 12686.59 1.05 13320.92
Depth Range - 16 to 17.00 m 13320.92 1.05 13986.97
Depth Range - 17 to 18.00 m 13986.97 1.05 14686.32
Depth Range - 18 to 19.00 m 14686.32 1.05 15420.64
Depth Range - 19 to 20.00 m 15420.64 1.05 16191.67

35 RBR-FNDN-14 : A: Sinking of 7 m external diameter well (other than pneumatic method of sinking) through all types
of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical
specifications 1207 MORTH. Depth of sinking is reckoned from bed level.
Unit = Running Meter.
Taking output = 1 m
Diameter of well - 7 m.
Clayee Soil
a Depth below bed level upto 3.0 M
Rate of sinking = 0.30 m per hour.
a) Labour
Mate - day
Sinker ( skilled ) 1.50 day 678.00 1 day 1017.00
Sinking helper ( semi-skilled ) 3.18 day 540.00 1 day 1717.20
b) Machinery
Hire & running charges of crane with grab bucket of 4.50 hour 2419.20 1 hour 10886.40
0.75 cum capacity and accessories.
Consumables in sinking @10 per cent of (b) 10.00% 1088.64
14709.24
Overheads & Contractors Profit 2059.29
Grand Total 16768.53
VAT & Labour cess 0% 0.00
Rate per Rmt Rs 16768.53

b Beyond 3m upto 10m depth


Rate of sinking = 0.22 m per hour.
a) Labour
Mate - day
Sinker 2.00 day 678.00 1 day 1356.00
Sinking helper ( semi-skilled ) 4.26 day 540.00 1 day 2300.40
b) Machinery
Hire & running charges of crane with grab bucket of 6.00 hour 2419.20 1 hour 14515.20
0.75 cum capacity and accessories.
Air compressor with pneumatic chisel attachment 3.25 hour 588.40 1 hour 1912.30
for cutting hard clay. ( Hire- R&B- Sn.4)

Consumables in sinking @10 per cent of (b) 10.00% 1642.75


21726.65
Overheads & Contractors Profit 3041.73
Grand Total 24768.38
VAT & Labour cess 0% 0.00
447524687.xlsx - data-Road
Rate per Rmt
Page 1690 of 2191 Rs 24768.38

c Beyond 10m upto 20m


a. Add 5 percent for every additional meter depth
of sinking over the rate of sinking for the previous
meter -(RBR-FNDN-13-A-iii-a)
Rate per Rmt
Depth Range - 10 to 11.00 m 24768.38 1.05 26006.80
Depth Range - 11 to 12.00 m 26006.80 1.05 27307.14
Depth Range - 12 to 13.00 m 27307.14 1.05 28672.50
Depth Range - 13 to 14.00 m 28672.50 1.05 30106.13
Depth Range - 14 to 15.00 m 30106.13 1.05 31611.44
Depth Range - 15 to 16.00 m 31611.44 1.05 33192.01
Depth Range - 16 to 17.00 m 33192.01 1.05 34851.61
Depth Range - 17 to 18.00 m 34851.61 1.05 36594.19
Depth Range - 18 to 19.00 m 36594.19 1.05 38423.90
Depth Range - 19 to 20.00 m 38423.90 1.05 40345.10

36 RBR-FNDN-30: Driven precast vertical M 35 grade with a minimum cement content of 420 kg / cum R.C.C piles
excluding reinforcement - 500 mm diameter pile (using crane, vibrating pile driving hammer with power unit)
including the cost of materials, labour and transportation cost @ 1% of material and machinery as per Drawing and &
Technical Specification in Section 1100 & 1700 MORTH
Pile Diameter = 500 mm
Unit = Running Meter
Taking output = 60 m
a) Materials
RCC Grade M35 11.78 cum Err:509 1 cum Err:509
Rate for concrete may be adopted same as for
bottom plug vide item no. 12( F ) (IV)
b ) Material Pile shoes
a) C.I Shoes -M-080, Pg No.29 of irri.SoR 240.00 Kg #REF! 1 Kg #REF!
b) M.S. shoes -Yanam-PSR-2013-14, Pg.68 105.00 Kg 54.00 1 Kg 5670.00
c) Steel helmet and cushion block on top of pile 30.00 Kg 54.00 1 Kg 1620.00
head during driving.-M-173, Pg No.33
c) Machinery
Crane 20 t capacity 6.00 hour 885.92 1 hour 5315.52
Vibrating Pile driving hammer complete with power 6.00 hour 35420.00 1 hour 212520.00
unit and accessories.( Rate adopted from Yanam
-PSR-2013-14-Code No.0027, Sn.18, Pg.1)

d) Labour
Mate/Supervisor - day
Mazdoor (Unskilled) 3.12 day 510.00 1 day 1591.20
Add 1 per cent of (a+b+c) for carriage of piles 1% on Rs. #REF! #REF!
from casting yard to work site and stacking, and
other imponderables during installation.

#REF!
e&f) Overheads & Contractors Profit 14% #REF!
Cost for 60 m = a+b+c+d+e+f #REF!
Rate per metre (a+b+c+d+e+f)/60 #REF!
VAT & Labour cess 0% #REF!
Rate per Rmt Rs #REF!

37 RBR-FNDN-39 - 39.i : Cement Concrete for Reinforced Concrete in Pile Cap complete as per Drawing and Technical
Specifications in Section 1100, 1500 & 1700 MORTH
A. RCC Grade M20 (Design Mix)
Unit = cum
Taking output = 15 cum
Using Concrete Mixer
a) Material
Cement 5.12 t 4600.00 1t 23552.00
Coarse sand 6.75 cum 1303.00 1 cum 8795.25
447524687.xlsx - data-Road
20 mm Aggregate Page 1691 of 8.10
2191cum Err:509 1 cum Err:509
10 mm Aggregate 5.40 cum Err:509 1 cum Err:509
b) Labour
Mate - day
Mason 1.50 day 564.00 1 day 846.00
Mazdoor (Unskilled) for concreting 20.90 day 510.00 1 day 10659.00
Mazdoor (Unskilled) for breaking pile head, 1.00 day 510.00 1 day 510.00
bending bars, cleaning etc.
c) Machinery
Concrete mixer (cap. 0.40/0.28 cum) 6.00 hour 397.50 1 hour 2385.00
Generator (capacity 33 KVA) 6.00 hour 1007.20 1 hour 6043.20
Err:509
Formwork @ 4 per cent on cost of concrete i.e. 4% Err:509
cost of a) Material, b) Labour and
c) Machinery
Sub - Total Err:509
d&e) Overheads & Contractors Profit 14% Err:509
Err:509
VAT & Labour cess 0% Err:509
Cost for 15 cum = a+b+c+d+e Rs Err:509
Rate per metre (a+b+c+d+e)/15 Err:509

38 RBR-FNDN-7 : Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and
technical specifications Clauses 1000 and 1202 MORD & 1100, 1600 MORTH for Bars below 36 mm dia including
over laps and wastage, where they are not welded.
Unit = t
(a) Material
HYSD bars including 5 per cent for overlaps and 1.05 t Err:509 1t Err:509
wastage
Binding wire 6.00 kg #REF! 1 kg #REF!
(b) Labour for cutting, bending, shifting to site,
tying and placing in position
Mate - day
Blacksmith 2.00 day 564.00 1 day 1128.00
Mazdoor (Unskilled) 6.40 day 510.00 1 day 3264.00
Err:509
c&d) Overheads & Contractors Profit 14% Err:509
Rate per 1 MT( = a+b+c+d) Err:509
VAT & Labour cess 0% Err:509
Err:509
Rate per 1 Kg Err:509

39 RBR-FNDN-10-A : Providing and Constructing Temporary Island 16 m diameter for Construction of Well Foundation
for 8m dia. Well as per Tech. Specification 1203 MORTH.
A Assuming depth of water 1.0 m and height of
island to be 1.25 m.
Unit = 1 No
Taking output = 1 No.
a) Material
Earth (compacted) 251.20 cum 115.26 1 cum 28953.31
Sand bags 750.00 each #REF! 1 each #REF!
b) Labour
Mate - day
Mazdoor for filling sand bags, stitching and placing 15.40 day 1 day 7854.00
510.00
c) Machinery
Crane with grab 1 cum capacity (Hire- R&B-Sn.35) 20.00 hour 1 hour 79116.80
3955.84
#REF!
Consumables @ 2.5 per cent of (c) above 2.50% #REF!
#REF!
d&e) Overheads & Contractors Profit 14% #REF!
Rate per No. (a+b+c+d+e) #REF!
447524687.xlsx - data-Road
Note : It is assumed that earth will be available within the
Pageworking space of crane with grab bucket.
1692 of 2191

C RBR-FNDN-10-C:Providing and constructing one span service road to reach island location from one pier location to
another pier location as per Tech. Specification 1203 MORTH.
Assuming span length 30 m, width of service road
10m and depth of water 1m
Unit = 1 meter
Taking output = 30 metre
a) Material
Earth 450.00 cum 115.26 1 cum 51867.00
Sand bags 300.00 each #REF! 1 each #REF!
b) Labour
Mate - day 0.00
Mazdoor (Unskilled) for filling sand bags, stitching 6.24 day 510.00 1 day 3182.40
and placing
c) Machinery
Front end Loader 1 cum capacity 27.00 hour 1843.52 1 hour 49775.04
Tipper 5.5 cum capacity 28.00 hour 924.10 1 hour 25874.80
#REF!
d&e) Overheads & Contractors Profit 14% #REF!
Cost for 30 m = (a+b+c+d+e) #REF!
Rate per m = (a+b+c+d+e)/30 #REF!

40 Providing and fixing M.S.chequerred plate flooring of 6mm thickness supported on M.S.Girders including welding,
cutting and fabricating the plates to the required square or rounding shape, making holes in the plate, including
providing and applying 3 coats of anti corrosive paint, etc.complete as directed by Engineer-in-charge.
6mm thick M.S.chequerred plate @ 56.15 Kg/Sqm 56.15 Kg #REF! 1 Kg #REF!

Labour charges for fabrication -BMM-V.16 - Sn-936 56.15 Kg #REF! 1 Kg #REF!

add MA on LC 20% #REF!


Labour charges for fixing - BMM-V.17 - Sn.937 56.15 Kg #REF! 1 Kg #REF!
add MA on LC 20% #REF!
2 coats of coal tar epoxy paint ( Both sides) 2.00 Sqm #REF! 1 Sqm #REF!
#REF!
Overheads & Contractors Profit 14% #REF!
Rate per 1 Sqm #REF!

41 in accordance with IRR-PMW-3-18 : Providing two coats of painting 100 micron dry film thickness each coat to
embedded parts / gates with cold applied coal tar epoxy paint of approved quality including removing rust, cleaning
surface, cost of all materials, labour, scaffolding etc., all lifts.complete with all leads and all lifts.
Unit 100 Sqm
Coal tar epoxy paint - irrigation SSR-86, Pg.15 34.00 ltr #REF! 1 ltr #REF!
Sundries ( rust remover / brush etc ) as per Irri. data 4.00 LS 30.00 1 No 120.00
Add for scaffolding / ladder etc @ 10% #REF!
Painter Class-II ( Labour-Irri-Semi skilled-Sn.37) 13.00 Day 540.00 1 No 7020.00
mazdoor 6.00 Day 510.00 1 No 3060.00
Cost for 100 Sqm = #REF!
Rate per Sqm = (a+b+c+d+e)/100 #REF!
d&e) Overheads & Contractors Profit 14% #REF!
Rate per 1 Sqm #REF!

42 Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together through
their entire length and jointed together at the ends by end-locks, mounted on specially designed pipe shaft of 50mm
dia nominal bore MS B class pipe with brackets, plates, guide channels, stoppers, bottom locking plates and
arrangements for inside & outside locking with push-pull operations including cost of hood cover and springs
complete, painted with one coat of approved steel primer, locks, ball bearings, all accessories etc complete for
finished item of work as per special spn: 1108
Rate as per SSR Item No. 156,Pg 18 -BMT-F.29 1.00 Sqm #REF! 1 Sqm #REF!
over heads & contractors profit 14% #REF!
Sub-Total #REF!
VAT & Labour cess 0% #REF!
447524687.xlsx - data-Road
Rate per 1 Sqm Page 1693 of 2191 Rs #REF!

43 BMT-P.25: NCL or Equivalent ECO 3000 SERIES WINDOWS (SUITABLE FOR RESIDENTIAL BUILDINGS WITH
GRILL PROVISION) Providing and Fixing of windows made of pre-painted steel (Base steel as per IS 513 of 0.6mm
thick galvanized as per IS 277 with Zinc of 120 GSM). Primer coated with epoxy primer of 5-7 microns thick, finish
painted with a polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd backer. Section for
outer frame should be of 48x50mm, centre mullion should be of 48x50mm, section for shutter should be of 47x20mm
and Fixed glass beading section should be of 12x12mm. Outer frame and mullions to have rebate for Glazed shutter
and a 20mm provision for Guard bars/Grills. The sections are to be cut to length metre joined with corner bracket.
Centre mullion is to be fixed with mullion cap. Seccolor Handle, seccolor stay, 2 nos. of Stainless Steel heavy duty
Pivot hinges shall be provided per shutter. The windows should be panelled with 5mm thick plain float glass. Rubber
Gaskets are provided all around the glass. The above frames should be fixed to the concrete/masonry wall by means
of self expanding screws, Including 10mm Square guard bars with 6” (152.4mm) pitch etc., complete for finished item
of work.

a Double shutter Window with vertical member 4’0” x 4’0” (1219.2mm x 1219.2mm) outer frame section size of
48x50mm shutter frame section size of 47x20mm and mullion section should be of 48x50mm.
Rate as per SSR Item No. 742 Pg 62 -BMT-P.25 1 Sqm #REF! 1 Sqm #REF!
over heads & contractors profit 14% #REF!
Sub-Total #REF!
VAT & Labour cess 0% #REF!
Rate per 1 Sqm Rs #REF!

b Centre fixed both side openable shutter window 5’0”x4’0” (1524mm x1219.2mm). Outer frame section size of
48x50mm. Shutter frame section size of 47x20mm. Mullion section size of 48x50mm. Fixed beading section size of
12x12mm.
Rate as per SSR Item No. 743 Pg 62 -BMT-P.26 1 Sqm #REF! 1 Sqm #REF!
over heads & contractors profit 14% #REF!
Sub-Total #REF!
VAT & Labour cess 0% #REF!
Rate per 1 Sqm Rs #REF!

44 Supplying and fixing of MS Grill for windows using 25mm x 6mm MS flat alround and 10mm MS square bars
horizontally at 125mm centre to centre and vertically at 30cm centre to centre including fixing with 4 Nos of MS Z
holdfasts (2 on each side) duly making cutting brick masonry, fixing and making to original surface neatly and
painting grill with one coat of red oxide primer including and conveyance of all materials ,cutting, bending, welding
including all operational charges and all labour charges etc., complete for finished item of work.
For MS Grill 1.50 x 1.50 = 2.25 Sqm
Quantity Anailysis
25mm x 6mm MS flat alround @ 1.20 Kg/Rmt
Vertical Flat 2 Nos 1.50 3.00
Horizontal Flat 2 Nos 1.50 3.00
Z Holdfasts 4 Nos 0.45 2.00
8.00 Rmt
8.00 Rmt 1.20 Kg/Rmt 9.60 Kgs
10mm M.S square bars @ 0.78 kg /Rmt
Vertical bars 5 Nos 1.50 8.00 Rmt
Horizontal bars 12 Nos 1.50 18.00 Rmt
26.00 Rmt
26.00 Rmt 0.78 Kg/Rmt 20.28 Kgs
29.88 Kgs
Cost Analysis
Cost of 25X 6mm MS Flat 9.60 Kgs 44.50 1 Kg 427.20
Cost of 10mm MS squre bars 20.28 Kgs 44.50 1 Kg 902.46
Labour charges for fabricating steel and fixing in 29.88 Kgs #REF! 1 Kg #REF!
positioncharges
Labour as per SSR ItemIron
for fixing No.BMM-V.14-824
Doors, Iron Windows 29.88 Kgs #REF! 1 Kg #REF!
and
M.A on Labour component @ BMM-V.15-825.Pg-
Window Grills in position- 20% #REF!
68 Rate per 29.88 Kgs Rs. #REF!
Rate per 1 Sqm #REF!
Rate per 1 Kg Rs. #REF!

447524687.xlsx - data-Road
45 BLD-CSTN-9-13-(111): Gronolithie Concrete Flooring 202191
Page 1694 of mm thick with (1:1:2), using 6mm to 12 mm size hard
granite machine crushed metal laid over CC bed already laid or RCC roof slab, in alternate panels of size not
exceeding 1.50 m x 1.50 m and finishing the top surface to required smoothness and slopes and thread lining
including cost of all materials like cement, metal, sand and water etc., complete, including seigniorage charges, etc.,
complete for finished item of work.

A. MATERIALS:
6mm to 12 mm H.G. Metal (Machine crushed) 0.17 Cum 1118.70 1 Cum 190.18
Cement 120.00 Kg 4.60 1 Kg 552.00
Sand 0.085 Cum 1303.00 1 Cum 110.76
B. LABOUR:
Mason 1st class 1.25 day 564.00 1 day 705.00
Mason 2nd class 0.06 day 540.00 1 day 32.40
Mazdoor (unskiled) 3.00 day 510.00 1 day 1530.00
Rs 3120.34
Add water charges 1% 1.00% 31.20
Total 3151.54
over heads & contractors profit 14% 441.22
Sub-Total 3592.76
Add Labour Cess @ 0% 0.00
Rate per 10 Sqm Rs 3592.76

46 BLD-CSTN-11-4- (161) : White washing one coat with whiting of approved quality to give an even shade after
thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all
materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but
excluding conveyance charges of materials
Whiting / White Cement - BMS-W.68 1.20 Kg #REF! 1 Kg #REF!
Gum, conjee water, or prickly pear juice including LS 10.00
necessary fire wood
Brick Layers / Painter 0.11 day 564.00 1 day 62.04
Mazdoor (unskilled) 0.22 day 510.00 1 day 112.20
#REF!
Sundries including brushes, ladders, etc., 0.50% #REF!
#REF!
over heads & contractors profit 14% #REF!
Sub-Total #REF!
Add Labour Cess @ 0% #REF!
Rate per 10 Sqm Rs #REF!
Rate per 1Sqm Rs #REF!

47 Manufacturing, supply and erection of 600 mm width ladders with 50X50X6 mm MS angles 2 nos verticals and
horizontals fixed at 25 cm c/c as per aprooved drawing and as directed by the departmental officers and painting
both sides with anti corrosive paint two coats over one coat of primary coat including cost of all materials fabrication,
welding transportation to site, all taxex and duties, fixing in position duly embodying in CC (1:1.5:3) prop., and all
other incidental and operational charges etc., complete for finished item of work.
Cost of ladder of 4.0 m
Weight of 50x50x6mm MS channels =(14.50 Rmt x 61.05 kg
4.42 kg/Rmt =
total 61.05 kg

Cost of MS channels ( Rate of steel as per CE- 61.05 kg 44.50 1 kg 2716.73


(PH), memo )
fabrication charges, Item-BMM-V.14-934 61.05 kg #REF! 1 Kg #REF!
add Labour allowence on fabrication 20% #REF!
Hoisting and fixng in position
Painting with synthetic enamel paint aera = 17 x 0.2 2.90 sqm #REF! 10 Sqm #REF!
Rate for 4.00 Rmt #REF!
VAT & labour cess 0% #REF!
#REF!
for 1.00 Rmt #REF!
Rate per 1.00 Rmt Rs. #REF!
Rate per 1.00 Kg Rs. #REF!
447524687.xlsx - data-Road
48 Manufacture as per BIS:12592 (Part 1&2) SupplyPage& Delivery of man hole covers and frames anywhere in A.P., F.O.R.
1695 of 2191
destination including, loading, un-loading & stacking at site ,central excise duty,but excluding sales tax, octroi and
other Govt levies etc., as applicable.ISI mark
Table 29, Pg No.80 of the SSR (PH items)
c H.D.-20 with 560mm dia clear opening 1 No 2133.00 1 each 2133.00
Add CED @ 0.00% 0.00
Add ST @ 0.00% 0.00
2133.00
Overheads & Contractors Profit on basic cost 14% 298.62
Rate per each 2431.65
Add VAT & Labour cess etc. @ 0% 0.00
Rate per each 2431.65

Use rate of shuttering and Scaffolding materials :


Consider one shutter and one soldier set :
Size of shutter considered : 900 mm x 1200 mm 1.08 sqm
Length of soldier for fixing shutter 2.30 m
4 mm thick plate 1.08 sqm @ 31.4 kg / sqm 33.91 kg
50x50x6 mm angle 6.6 m length @ 3.8 kg / m 25.08 kg
50x6 mm flat 1.8 m length @ 2.35 kg / m 4.23 kg
ISLC 100 2.3 m length @ 7.9 kg / m 18.17 kg
6 mm plate 0.03 sqm @ 47.1 kg / sqm 1.41 kg
82.80 kg
Cost of 4 mm plate 33.91 kg 33.91 Kg Err:509 1 Kg Err:509
Cost of 6.6 m angle 25.08 kg 25.08 Kg 44.50 1 Kg 1116.06
Cost of 1.8 m flat 4.23 kg 4.23 Kg 44.50 1 Kg 188.24
Cost of 2.3 m soldier 18.17 kg 18.17 Kg 44.50 1 Kg 808.57
Cost of 6mm plate 1.41 kg 1.41 Kg Err:509 1 Kg Err:509
Err:509
Add for wastage @ 2.50% Err:509
Add for bolts & nuts @ 0.5 kg / sqm - M-130 - Irri 0.5 Kg #REF! 1 Kg #REF!
Add for fabrication of shutter (Sn.15, Pg.24) Irri 82.80 Kg #REF! 1 Kg #REF!
Err:509
Deduct salvage value @ 15% Err:509
Err:509
Use rate of shutters:
Use rate of shutters considering average 40 Uses Err:509
Add for repairs / replacements / catwalks etc.@ 15% Err:509
Add for binding wire / temperary supports etc.@ 5% Err:509
Add for 2 J-bolts / sqm for fixing soldier @ Rs:Sn.46 2 Nos #REF! 1 No #REF!
Add for shutter oil at 0.2 ltr / sqm Rs: Sn. 14, Pg.23 0.2 ltr #REF! 1 ltr #REF!
Err:509
Effective area of shutter & soldier
( allowing 10 cm margin at top / bottom )
Use rate of shuttering for concrete / use / sqm for 40 uses
( Excluding T & P / Profit / Overheads)

Erection and dismantling shuttering / scaffolding : 100.00 sqm


2 Fitters, 1 Carpentor Cl-II & 5 mazdoors erect 50
sqm shuttering & scaffolding / day.
Cost of dismantling assumed at 50 % of erection
charges.
Area of shuttering with scaffolding / supports
considered.
Cleaning, conveying, erection and oiling:
Fitter shuttering ( Labour-Irri-Skilled-Sn.40) 4 Nos 696.00 1 Kg 2784.00
Carpentor Cl -II ( Labour-Irri-II-Sn.40) 2 Nos 540.00 1 Kg 1080.00
mazdoor 10 Nos 510.00 1 Kg 5100.00
Dismantling and stacking:
Fitter shuttering 2 Nos. 2 Nos 696.00 1 Kg 1392.00
447524687.xlsx - data-Road
Carpentor Cl -II 1 Nos. Page 1696 of 21911 Nos 540.00 1 Kg 540.00
mazdoor 5 Nos. 2 Nos 510.00 1 Kg 1020.00
11916.00
119.16
Labour charges for shuttering / scaffolding per sqm
( Excluding T & P / Profit / Overheads / Hidden
costs )

Data for Summer Storage Tank & Waste Water Treatment Plant works
1 IRR-CAW-1-1: Excavation in all kinds of soil including boulders upto 0.3 m diameter for canal, seating of
embankment, filter drains / catch water drains etc., including dressing bed and sides to required level and profile,
cost of all materials, machinery, labour, placing the excavated soil neatly in dump area or for the formation of service
road / embankment as directed etc., complete with initial lead upto 1 km and all lifts.

Description Quantity Rate Per Amount


Unit 925 Cum
A. MATERIALS:
Nil 0.00
B. MACHINERY:
Shovel 0.85 cum capacity ( S.N.53 - Hire-Irrigation) 8.00 Hour 2967.90 1 Hour 23743.20

Tippers 5 cum capacity 6 Nos ( S.N.55 - Hire- 48.00 Hour 1004.40 1 Hour 48211.20
Irrigation)
Total hire charges of Machinery 71954.40
C. LABOUR:
work inspector (S.No.10 - Labour- Skilled - 1.00 Day 678.00 1 Day 678.00
irrigation)
mazdoor (S.No.3 - Labour- Un Skilled - irrigation) 30.00 Day 510.00 1 Day 15300.00

Cost of Labour 15978.00


Total of A+B+C 87932.40
over heads & contractors profit 14% 11972
Total cost for 925 Cum 99904.40
Add VAT @ 0% 0.00
99904.40
Rate per 1 Cum 108.00

2 IRR-CAW-1-2: Excavation in all kinds of soil including boulders upto 0.3 m diameter for canal, seating of
embankment, filter drains / catch water drains etc., including dressing bed and sides to required level and profile,
cost of all materials, machinery, labour, placing the excavated soil neatly in dump area or for the formation of service
road / embankment as directed etc., complete with initial lead upto 10m and lift up to 3m.
Unit 440 Cum
A. MATERIALS:
Nil 0.00
B. MACHINERY:
Shovel 0.50 cum capacity ( S.N.52 - Hire-Irrigation) 8.00 Hour 1804.40 1 Hour 14435.20

Total hire charges of Machinery 14435.20


C. LABOUR:
work inspector (S.No.10 - Labour- Skilled - 1.00 Day 678.00 1 Day 678.00
irrigation)
mazdoor (S.No.3 - Labour- Un Skilled - irrigation) 17.00 Day 510.00 1 Day 8670.00

Cost of Labour 9348.00


Total of A+B+C 23783.20
D. Add for contractor's profit and overheads on 14% 3238.08
(A+B+C)
Total cost for 440 Cum 27021.28
Add VAT @ 0% 0.00
27021.28
Rate per 1 Cum 61.40

447524687.xlsx - data-Road
3 IRR-CAW-4-1: Providing impervious hearting embankment with soil collected in embankment area in heaps as part
Page 1697 of 2191
of disposal of excavated soil from canal including cost of all materials,machinery, labour, all operations such as
sortingout, spreading in layer of 25 cm before compaction, breaking clods,sectioning, watering and compacting each
layer to density control of not less than 98 percent or as stipulated by sheep's foot / pad foot roller etc., complete with
lead upto 1 km for water.

Unit 600 Cum


A. MATERIALS:
Seioniorage charges for soil 600.00 Cum 22.00 1 Cum 13200.00
B. MACHINERY:
Angle dozer 90 hp ( S.N.8 - Hire-Irrigation) 3.60 Hour 2661.20 1 Hour 9580.32
Pump 5 hp ( diesel ) ( S.N.27 - Hire-Irrigation) 3.00 Hour 232.20 1 Hour 696.60
Water tanker 8000 ltr ( S.N.65 - Hire-Irrigation) 5.00 Hour 961.90 1 Hour 4809.50
Vibratory pad foot roller 8 tonne ( S.N.63 - Hire- 7.30 Hour 2878.90 1 Hour 21015.97
Irrigation)
Sundries 60.00
Total hire charges of Machinery 36162.39
C. LABOUR:
work inspector (S.No.10 - Labour- Skilled - 1.00 Day 678.00 1 Day 678.00
irrigation)
mazdoor (S.No.3 - Labour- Un Skilled - irrigation) 4.00 Day 510.00 1 Day 2040.00

Cost of Labour 2718.00


Total of A+B+C 52080.39
D. Add for contractor's profit and overheads on 14% 7090.75
(A+B+C)
Total cost for 600 Cum 59171.14
Add VAT @ 0% 0.00
59171.14
Rate per 1 Cum 98.60

4 IRR-CAW-7-1: Providing cohesive non-swelling ( CNS ) soil lining to canals using soil from approved borrow area
including spreading soil in layers of thickness not more than 15 cm, breaking clods, watering, compacting to density
control of not less than 98 percent or as stipulated, dressing to required profile etc., complete with initial lead upto 1
km and all lifts.
Unit 394 Cum
A. MATERIALS:
Seioniorage charges for soil 394.00 Cum 22.00 1 Cum 8668.00
B. MACHINERY:
Shovel 0.50 cum capacity ( S.N.52 - Hire-Irrigation) 8.00 Hour 1804.40 1 Hour 14435.20

Angle dozer 90 hp ( S.N.8 - Hire-Irrigation) 3.00 Hour 2661.20 1 Hour 7983.60


Tippers 5 cum capacity 6 Nos ( S.N.55 - Hire- 24.00 Hour 1004.40 1 Hour 24105.60
Irrigation)
Pump 5 hp ( diesel ) ( S.N.27 - Hire-Irrigation) 4.00 Hour 232.20 1 Hour 928.80
Water tanker 8000 ltr ( S.N.65 - Hire-Irrigation) 4.00 Hour 961.90 1 Hour 3847.60
Diesel road roller 8-10 tonne ( S.N.51 - Hire- 11.50 Hour 1342.30 1 Hour 15436.45
Irrigation)
Sundries
Total hire charges of Machinery 66737.25
C. LABOUR:
work inspector (S.No.10 - Labour- Skilled - 2.00 Day 678.00 1 Day 1356.00
irrigation)
mazdoor (S.No.3 - Labour- Un Skilled - irrigation) 38.00 Day 510.00 1 Day 19380.00

Cost of Labour 20736.00


Total of A+B+C 96141.25
D. Add for contractor's profit and overheads on 14% 13089.63
(A+B+C)
Total cost for 394 Cum 109230.88
Add VAT @ 0% 0.00
109230.88
Rate per 1 Cum 277.20

447524687.xlsx - data-Road
5 IRR-CAW-7-32: Providing and fixing LDPE sheetPage for1698
bed and sides of canal including cost of all materials, labour,
of 2191
laying, joining etc., complete with all leads and lifts. Using 1000 micron thick LDPE sheet.including providing average
75 mm thick unscreened sand backing to LDPE sheet.

Unit 250 Sqm


A. MATERIALS:
LDPE sheet 1000 micron thick ,Sl.No-54, Pg-13 of 275.00 Sqm #REF! 1 Sqm #REF!
the SSR (2014-15) - Irrigation
Bitumen 85 / 25 and 80 / 100 Gr ( HPCL rate) 4.00 Kg 33.25 1 Kg 133.00
Sand unscreened ( S.No.1 of C-mat) 18.75 Cum 1303.00 1 Cum 24431.25
Total cost of Materials #REF!
B. MACHINERY:
Total hire charges of Machinery 0.00
C. LABOUR:
Joining & laying @ 10 % of sheet cost 10% #REF!
mazdoor for Sand Filling (S.No.3 - Labour- Un 6.00 Day 510.00 1 Day 3060.00
Skilled - irrigation)
mazdoor for Sheeting (S.No.3 - Labour- US - 1.00 Day 510.00 1 Day 510.00
irrigation)
Cost of Labour #REF!
Total of A+B+C #REF!
D. Add for contractor's profit and overheads on 14% #REF!
(A+B+C)
Total cost for 250 Sqm #REF!
Add VAT @ 0% #REF!
#REF!
Rate per 1 Sqm #REF!

6 IRR-CAW-7-30: Providing and fixing LDPE sheet for bed and sides of canal including cost of all materials, labour,
laying, joining etc., complete with all leads and lifts. Using 500 micron thick LDPE sheet.including providing average
75 mm thick unscreened sand backing to LDPE sheet.
Unit 250 Sqm
A. MATERIALS:
LDPE sheet 500 micron thick ,Sl.No-52, Pg-13 of 275.00 Sqm #REF! 1 Sqm #REF!
the SSR (2014-15)
Bitumen 85 / 25 and 80 / 100 Gr (HPCL Rate) 4.00 Kg 33.25 1 Kg 133.00
Sand unscreened ( S.No.1 of C-mat) 18.75 Cum 1303.00 1 Cum 24431.25
Total cost of Materials #REF!
B. MACHINERY:
Total hire charges of Machinery 0.00
C. LABOUR:
Joining & laying @ 10 % of sheet cost 10% #REF!
mazdoor for Sand Filling (S.No.3 - Labour- Un 6.00 Day 510.00 1 Day 3060.00
Skilled - irrigation)
mazdoor for Sheeting (S.No.3 - Labour- US - 1.00 Day 510.00 1 Day 510.00
irrigation)
Cost of Labour #REF!
Total of A+B+C #REF!
D. Add for contractor's profit and overheads on 14% #REF!
(A+B+C)
Total cost for 250 Sqm #REF!
Add VAT & LC @ 0% #REF!
#REF!
Rate per 1 Sqm #REF!

7 IRR-CAW-7-8 : Providing and laying 100 mm thick in situ M-15 (28 days cube compressive strength not less than
15 N /Sqmm ) grade cement concrete with 20 mm down size approved, clean, hard, graded aggregates for canal
lining using, vibrating, cylinder type mechanical paver including cost of all materials, machinery, labour, cleaning,
batching, mixing, placing in position, finishing, forming contraction joints, fixing PVC joint sealing strips, curing,
shifting of paver from one side to othere side of canal etc., complete with initial lead upto 1 Km and all lifts.

Unit 800 Sqm


Cement 43 Gr ( CE-PH-Memo) 26400.00 Kg 4.60 1 Kg 121440.00
Coarse aggregate 20-10 mm (S.No.52 of C-Mat) 45.76 cum Err:509 1 cum Err:509
Coarse aggregate 10 to 4.75 mm (S.No.51 of C- 24.64 cum Err:509 1 cum Err:509
Mat)
Fine aggregate (Screened) (S.No.3 of C-Mat) 39.60 cum 1493.00 1 cum 59122.80
447524687.xlsx - data-Road
Super plasticiser -(S.n.70- Pg-14 - Irrigation SSR)
Page 1699 105.60
of 2191 kg #REF! 1 kg #REF!

PVC sealing strip , (Sl No.59, Pg 13 - irrigation 533.00 Rm #REF! 1 Rm #REF!


SSR)
Use rate of paving cylinder (as per Irrigation data ) 800.00 sqm #REF! 1 sqm #REF!
A Total cost of Materials Err:509
Batching plant ( S.N.9 - Hire-Irrigation) 8.00 Hour 608.10 1 Hour 4864.80
Transit mixer 3 Nos ( S.N.33 - Hire-R&B -2013-14) 24.00 Hour 1917.50 1 Hour 46020.00

Mechanical paver ( S.N.24 - Hire-R&B -2013-14) 8.00 Hour 2518.88 1 Hour 20151.04
DG set for batching plant 50 KVA ( S.N.25 - Hire- 8.00 Hour 1431.80 1 Hour 11454.40
Irrigation)
DG set for paver 30 KVA ( S.N.24 - Hire-Irrigation) 8.00 Hour 1007.20 1 Hour 8057.60

Shovel 0.5 cum / Loader ( S.N.52 - Hire-Irrigation) 2.00 Hour 1804.40 1 Hour 3608.80

Water tanker ( S.N.65 - Hire-Irrigation) 8.00 Hour 961.90 1 Hour 7695.20


Pump 5 hp (diesel) 2 Nos. 4 hrs each ( S.N.27 - 8.00 Hour 232.20 1 Hour 1857.60
Hire-Irrigation)
B Total hire charges of Machinery 103709.44
Mason Class I (S.No.11 - Labour- Skilled - 2.00 Day 564.00 1 Day 1128.00
irrigation)
Mechanic (S.No.12 - Labour- Skilled - irrigation) 1.00 Day 600.00 1 Day 600.00
Fitter (S.No.6 - Labour- Skilled - irrigation) 1.00 Day 648.00 1 Day 648.00
Electrician (S.No.5 - Labour- Skilled - irrigation) 1.00 Day 648.00 1 Day 648.00
work inspector (S.No.10 - Labour- Skilled - 2.00 Day 678.00 1 Day 1356.00
irrigation)
mazdoor ( BP site ) (S.No.3 - Labour- US - 5.00 Day 510.00 1 Day 2550.00
irrigation)
mazdoor ( Paver site ) (S.No.3 - Labour- US - 10.00 Day 510.00 1 Day 5100.00
irrigation)
C Total cost of Labour 12030.00
Total of A+B+C Err:509
D. Add for contractor's profit and overheads on 14% Err:509
(A+B+C)
Total cost for 800 Sqm Err:509
Add VAT & LC @ 0% Err:509
Err:509
Rate per 1 Sqm Err:509

8 IRR-CAW-7-7: Providing and laying 80 mm thick in situ M-15 (28 days cube compressive strength not less than 15
N /Sqmm ) grade cement concrete with 20 mm down size approved, clean, hard, graded aggregates for canal lining
using, vibrating, cylinder type mechanical paver including cost of all materials, machinery, labour, cleaning, batching,
mixing, placing in position, finishing, forming contraction joints, fixing PVC joint sealing strips, curing, shifting of paver
from one side to othere side of canal etc., complete with initial lead upto 1 Km and all lifts.

Unit 960 Sqm


Cement 43 Gr ( CE-PH-Memo) 25344.00 Kg 4.60 1 Kg 116582.40
Coarse aggregate 20-10 mm (S.No.52 of C-Mat) 43.93 cum Err:509 1 cum Err:509
Coarse aggregate 10 to 4.75 mm (S.No.51 of C- 23.65 cum Err:509 1 cum Err:509
Mat)
Fine aggregate (Screened) (S.No.3 of C-Mat) 38.02 cum 1493.00 1 cum 56763.86
Super plasticiser -(S.n.70- Pg-14 - Irrigation SSR) 101.38 kg #REF! 1 kg #REF!

PVC sealing strip , (Sl No.59, Pg 13 - irrigation 640.00 Rm #REF! 1 Rm #REF!


SSR)
Use rate of paving cylinder (as per Irrigation data ) 960.00 sqm #REF! 1 sqm #REF!
A Total cost of Materials Err:509
Batching plant ( S.N.9 - Hire-Irrigation) 8.00 Hour 608.10 1 Hour 4864.80
Transit mixer 3 Nos ( S.N.33 - Hire-R&B -2013-14) 24.00 Hour 1917.50 1 Hour 46020.00

Mechanical paver ( S.N.24 - Hire-R&B -2013-14) 8.00 Hour 2518.88 1 Hour 20151.04
DG set for batching plant 50 KVA ( S.N.25 - Hire- 8.00 Hour 1431.80 1 Hour 11454.40
Irrigation)
DG set for paver 30 KVA ( S.N.24 - Hire-Irrigation) 8.00 Hour 1007.20 1 Hour 8057.60

Shovel 0.5 cum / Loader ( S.N.52 - Hire-Irrigation) 2.00 Hour 1804.40 1 Hour 3608.80

447524687.xlsx - data-Road
Water tanker ( S.N.65 - Hire-Irrigation) 8.00 Hour
Page 1700 of 2191 961.90 1 Hour 7695.20
Pump 5 hp (diesel) 2 Nos. 4 hrs each ( S.N.27 - 8.00 Hour 232.20 1 Hour 1857.60
Hire-Irrigation)
B Total hire charges of Machinery 103709.44
Mason Class I (S.No.11 - Labour- Skilled - 2.00 Day 564.00 1 Day 1128.00
irrigation)
Mechanic (S.No.12 - Labour- Skilled - irrigation) 1.00 Day 600.00 1 Day 600.00
Fitter (S.No.6 - Labour- Skilled - irrigation) 1.00 Day 648.00 1 Day 648.00
Electrician (S.No.5 - Labour- Skilled - irrigation) 1.00 Day 648.00 1 Day 648.00
work inspector (S.No.10 - Labour- Skilled - 2.00 Day 678.00 1 Day 1356.00
irrigation)
mazdoor ( BP site ) (S.No.3 - Labour- US - 5.00 Day 510.00 1 Day 2550.00
irrigation)
mazdoor ( Paver site ) (S.No.3 - Labour- US - 10.00 Day 510.00 1 Day 5100.00
irrigation)
C Total cost of Labour 12030.00
Total of A+B+C Err:509
D. Add for contractor's profit and overheads on 14% Err:509
(A+B+C)
Total cost for 960 Sqm Err:509
Add VAT & LC @ 0% Err:509
Err:509
Rate per 1 Sqm Err:509

9 IRR-CAW-7-6: Providing and laying 75 mm thick in situ M-15 (28 days cube compressive strength not less than 15
N /Sqmm ) grade cement concrete with 20 mm down size approved, clean, hard, graded aggregates for canal lining
using, vibrating, cylinder type mechanical paver including cost of all materials, machinery, labour, cleaning, batching,
mixing, placing in position, finishing, forming contraction joints, fixing PVC joint sealing strips, curing, shifting of paver
from one side to othere side of canal etc., complete with initial lead upto 1 Km and all lifts.
Unit 960 Sqm
Cement 43 Gr ( CE-PH-Memo) 23760.00 Kg 4.60 1 Kg 109296.00
Coarse aggregate 20-10 mm (S.No.52 of C-Mat) 41.18 cum Err:509 1 cum Err:509
Coarse aggregate 10 to 4.75 mm (S.No.51 of C- 22.18 cum Err:509 1 cum Err:509
Mat)
Fine aggregate (Screened) (S.No.3 of C-Mat) 35.64 cum 1493.00 1 cum 53210.52
Super plasticiser -(S.n.70- Pg-14 - Irrigation SSR) 95.04 kg #REF! 1 kg #REF!

PVC sealing strip , (Sl No.59, Pg 13 - irrigation 640.00 Rm #REF! 1 Rm #REF!


SSR)
Use rate of paving cylinder (as per Irrigation data ) 960.00 sqm #REF! 1 sqm #REF!
A Total cost of Materials Err:509
Batching plant ( S.N.9 - Hire-Irrigation) 8.00 Hour 608.10 1 Hour 4864.80
Transit mixer 3 Nos ( S.N.33 - Hire-R&B -2013-14) 24.00 Hour 1917.50 1 Hour 46020.00

Mechanical paver ( S.N.24 - Hire-R&B -2013-14) 8.00 Hour 2518.88 1 Hour 20151.04
DG set for batching plant 50 KVA ( S.N.25 - Hire- 8.00 Hour 1431.80 1 Hour 11454.40
Irrigation)
DG set for paver 30 KVA ( S.N.24 - Hire-Irrigation) 8.00 Hour 1007.20 1 Hour 8057.60

Shovel 0.5 cum / Loader ( S.N.52 - Hire-Irrigation) 2.00 Hour 1804.40 1 Hour 3608.80

Water tanker ( S.N.65 - Hire-Irrigation) 8.00 Hour 961.90 1 Hour 7695.20


Pump 5 hp (diesel) 2 Nos. 4 hrs each ( S.N.27 - 8.00 Hour 232.20 1 Hour 1857.60
B Hire-Irrigation)
Total hire charges of Machinery 103709.44
Mason Class I (S.No.11 - Labour- Skilled - 2.00 Day 564.00 1 Day 1128.00
irrigation)
Mechanic (S.No.12 - Labour- Skilled - irrigation) 1.00 Day 600.00 1 Day 600.00
Fitter (S.No.6 - Labour- Skilled - irrigation) 1.00 Day 648.00 1 Day 648.00
Electrician (S.No.5 - Labour- Skilled - irrigation) 1.00 Day 648.00 1 Day 648.00
work inspector (S.No.10 - Labour- Skilled - 2.00 Day 678.00 1 Day 1356.00
irrigation)
mazdoor ( BP site ) (S.No.3 - Labour- US - 5.00 Day 510.00 1 Day 2550.00
irrigation)
mazdoor ( Paver site ) (S.No.3 - Labour- US - 10.00 Day 510.00 1 Day 5100.00
C irrigation)
Total cost of Labour 12030.00
Total of A+B+C Err:509
D. Add for contractor's profit and overheads on 14% Err:509
(A+B+C) 447524687.xlsx - data-Road
Total cost for 960 Sqm Page 1701 of 2191 Err:509
Add VAT & LC @ 0% Err:509
Err:509
Rate per 1 Sqm Err:509

10 IRR-CAW-5-4: Providing and constructing dry rubble rock-toe using rubble and stone chips from approved source
including cost of all materials, machinery, labour, hand packing rubble and stone chips, finishing top and sides to
required slopes etc., complete with initial lead upto 50 m and all lifts.
Unit 100 Cum
Rubble (S.No.8 of C-Mat) 100.00 Cum 350.60 1 Cum 35060.00
Stone chips (S.No.5 of C-Mat) 15.00 cum 127.26 1 cum 1908.90
Sundries 2.00 30.00 1 0 60.00
A Total cost of Materials 37028.90
work inspector (S.No.10 - Labour- Skilled - Day 678.00 1 Day 678.00
irrigation) 1.00
Mason Class-II (S.No.35 - Labour- S.Skilled - 7.00 Day 540.00 1 Day 3780.00
irrigation)
mazdoor (S.No.3 - Labour- US - irrigation) 19.00 Day 510.00 1 Day 9690.00
B Total cost of Labour 14148.00
Total of A+B 51176.90
C. Add for contractor's profit and overheads on 14% 6967.73
(A+B)
Total cost for 100 Cum 58144.63
Add VAT & LC @ 0% 0.00
58144.63
Rate per 1 Cum 581.40

11 IRR-CAW-8-14: Providing 10 cm Thick approved type gross turfing to the side slopes of canal including cost of all
materials ,labour,watering for minimum 15 days etc.,,complete. with initial lead upto 50 m and all lifts ( WITHOUT
USING SAND)
Unit 100 Sqm
Turfing sods ( S.No.40- Pg.13 of 2014-15 SSR) 100.00 sqm #REF! 1 sqm #REF!
irrigation
Sand unscreened ( S.No.1 of C-mat) 0.00 cum 1303.00 1 cum 0.00
A Total cost of Materials #REF!
Cartman with double bullock cart (S.No.80 - Day 600.00 1 Day 1200.00
Labour- others(D) - R&B) 2.00
mazdoor (S.No.3 - Labour- US - irrigation) 7.00 Day 510.00 1 Day 3570.00
B Total cost of Labour 4770.00
Total of A+B #REF!
C. Add for contractor's profit and overheads on 14% #REF!
(A+B)
Total cost for 100 Sqm #REF!
Add VAT & LC @ 0% #REF!
#REF!
Rate per 1 Sqm #REF!

12 IRR-CAW-7-5 : Providing, fabricating and placing in position reinforcement steel bars for RCC works including
cleaning, straightening, cutting, bending, hooking, lapping, tying with 1.25 mm dia.soft annealed steel wire, welding
wherever required including cost of all materials, machinery,labour etc., complete with initial lead upto 50 and all lifts.

Unit 1000 Kg
Reinforcement .Steel with 5 % wastage ( CE-PH- 1050.00 kg Err:509 1 kg Err:509
Memo)
Binding wire 1.25 mm dia. S.No.3, Pg.11-2014-15 8.00 kg #REF! 1 kg #REF!
SSR
Sundries ( chairs / spacers etc ) 10.00 LS 30.00 300.00
A Total cost of Materials Err:509
Bar bender (S.No.1 - Labour- Skilled - irrigation) 6.00 Day 678.00 1 Day 4068.00
mazdoor (S.No.3 - Labour- US - irrigation) 11.00 Day 510.00 1 Day 5610.00
B Total cost of Labour 9678.00
Total of A+B Err:509
C. Add for contractor's profit and overheads on 14% Err:509
(A+B)
Total cost for 1000 Kg Err:509
Add VAT & LC @ 0% Err:509

447524687.xlsx - data-Road
Page 1702 of 2191 Err:509
Rate per 1 Kg Err:509

13 IRR-CAW-7-34: Providing and fixing 20 mm thick 100 mm depth tarfelt expansion joint filler boards for cement
concrete lining of canal including cost of all materials, labour etc., complete with all leads and lifts.
Unit 100 Rmt
Tarfelt joint filler board 20 mm thick,Sl.No.74,Pg.14- #REF! 1 Sqm #REF!
irri 10.00 Sqm
Total cost of Materials #REF!
Carpenter Cl- II (S.No.4 - Labour-SemiSkilled - 1.00 Day 540.00 1 Day 540.00
irrigation)
mazdoor (S.No.3 - Labour- US - irrigation) 1.00 Day 510.00 1 Day 510.00
Total cost of Labour 1050.00
Total of A+B #REF!
C. Add for contractor's profit and overheads on 14% #REF!
(A+B)
Total cost for 100 Rmt #REF!
Add VAT & LC @ 0% #REF!
#REF!
Rate per 1Rmt #REF!

14 IRR-CAW-7-36: Providing and forming 35 mm wide and 10 mm thick construction / contraction joints for concrete
lining by mastic filler including cost of all materials, labour etc., complete with all leads and lifts.
Unit 100 Rmt
Asphalt 80/100 Gr, - S.No.2, Pg.11-Irrigation 2014- 35.00 Kg #REF! 1 Kg #REF!
15
Sand ( screened ) (S.No.3 of C-Mat) 0.04 Cum 1493.00 1 Cum 59.72
A Total cost of Materials #REF!
Mason Class-II (S.No.35 - Labour- S.Skilled - 0.50 Day 540.00 1 Day 270.00
irrigation)
mazdoor (S.No.3 - Labour- US - irrigation) 1.00 Day 510.00 1 Day 510.00
B Total cost of Labour 780.00
Total of A+B #REF!
C. Add for contractor's profit and overheads on 14% #REF!
(A+B)
Total cost for 100 Rmt #REF!
Add VAT & LC @ 0% #REF!
#REF!
Rate per 1 Rmt #REF!

15 RBR-PTWK-12: (11) : Construction of toe walls for protection of slopes in PCC M -10 Grade as per drawing and
technical specifications Clause 1302.5 MORD
Unit 1 Cum
P.C.C grade M 10 - Machine Mixed
Nominal mix 1:3:6
(a) Material
Cement (CE-PH-memo) 0.220 t 4600.00 1t 1012.00
Coarse sand (S.No.2 of C-Mat) 0.45 cum 1303.00 1 cum 586.35
40 mm aggregate (S.No.57 of C-Mat) 0.570 cum Err:509 1 cum Err:509
20 mm aggregate (S.No.55 of C-Mat) 0.280 cum Err:509 1 cum Err:509
10 mm aggregate (S.No.53 of C-Mat) 0.050 cum Err:509 1 cum Err:509
(b) Labour
Mate - day
Mason(1st Class) (S.No.11 - Labour- Skilled - 0.10 day 564.00 1 day 56.40
irrigation)
Mazdoor (Unskilled) (S.No.3 - Labour- US - 1.39 day 510.00 1 day 708.90
irrigation)
(c) Machinery
Mechanical concrete mixer 0.4/0.28 cum capacity 0.40 hour 397.50 1 hour 159.00
fitted with water measuring device and preferably
also with load cell. ( S.N.17 - Hire-Irrigation)

Err:509
(d) Formwork @ 4% on cost of material, labour Err:509
and machinery (a+b+c)
Err:509

447524687.xlsx - data-Road
e&f) Overheads & Contractors Profit 14%
Page 1703 of 2191 Err:509
Rate per cum = a+b+c+d+e+f Err:509
Add VAT & LC @ 0% Err:509
Err:509
Rate per 1 Cum Err:509

16 Augoring and boring of holes in site for Bored cast-in-situ R.C.C. Piles for building foundations in loamy,
clayey soils like Black cotton soils and ordinary soils without under reams as per IS 2911 - 1980 as per approved
designs including all operations, incidental, labour charges, hire charges of machinery, augur bore drill and shell
equipment, etc, complete for all depths and for finished item of work for piles of following diameters -

Item No.20 of Pg.400, Amendment to Building


standard data -2011-12
a up to 300 mm dia
Total cost for 1 RM
A. MATERIALS :
Nil
B. LABOUR
Mazdoor (S.No.3 - Labour- US - irrigation) 0.526 day 510.00 1 day 268.26
C.Overheads & Contractors Profit 14% 36.52
304.78
Add VAT & LC @ 0% 0.00
304.78
Total per 1 Rmt 304.78

17 Augoring and boring of holes in site for Bored cast-in-situ R.C.C. Piles for building foundations in loamy,
clayey soils like Black cotton soils and ordinary soils without under reams as per IS 2911 - 1980 as per approved
designs including all operations, incidental, labour charges, hire charges of machinery, augur bore drill and shell
equipment, etc, complete for all depths and for finished item of work for piles of following diameters -

Item No.20 of Pg.400, Amendment to Building


standard data -2011-12
b up to 350 to 450 mm dia
Total cost for 1 RM
A. MATERIALS :
Nil
B. LABOUR
Mazdoor (S.No.3 - Labour- US - irrigation) 0.631 day 510.00 1 day 321.81
C.Overheads & Contractors Profit 14% 43.81
365.62
Add VAT @ 0% 0.00
365.62
Total per 1 Rmt 365.62

18 BLD-CSTN-3-14-(31) - A ; Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using
WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from
approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement
content as per IS code fo FOUNDATIONS, PLINTH, PEDESTALS

A FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth)


M-20 -Grade of Mix
20mm HBG graded metal 0.80 Cum Err:509 1 Cum Err:509
Sand 0.40 Cum 1303.00 1 Cum 521.20
Cement 350.00 Kg 4.60 1 Kg 1610.00
1st Class Mason 0.133 day. 564.00 1 day. 75.01
2nd Class Mason 0.267 day. 540.00 1 day. 144.18
Mazdoor (Both Men & Women) 4.60 day. 510.00 1 day. 2346.00
Weigh batcher hire charges, machine mixing charge 1.333 hour 397.50 1 hour 529.87

447524687.xlsx - data-Road
Vibrator hire charges ( Hire - Irrigation-41) Page 1704 of1.333
2191 hour 205.00 1 hour 273.27
Water (including for curing) - M-189. irrigation. 1.20 Kl 98.00 1 Kl 117.60
Pg.34 Err:509
Add VAT @ 0% Err:509
BASIC COST per 1 cum Rs Err:509

c Plinth beams
M-20 -Grade of Mix 1.00 Cum Err:509 1 Cum Err:509
Centering charges ,Pg No.106 to 111 of Bld.SSR 1.00 Cum 1390.00 1 Cum 1390.00
Labour charges Pg No.106 to 111 of Bld.SSR 1.00 Cum 1521.00 1 Cum 1521.00
Add Labour component @ 20% 304.20
Sub - Total Err:509
Overheads & Contractors Profit 14% Err:509
Sub - Total Err:509
Add VAT @ 0% Err:509
Add Labour Cess @ 14% Err:509
Rate per One Cum Rs Err:509

19 BLD-CSTN-3-15- ( 31 ) -B : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using
WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from
approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement
content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS.

COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS


A. MATERIALS:
20mm HBG graded metal (C-Mat-S.No:47) 0.80 cum Err:509 1 cum Err:509
Sand - (C-Mat-S.No:2) 0.40 cum 1303.00 1 cum 521.20
Cement (ENC-PH.Memo.No.146/Cement & Steel / 380.00 Kgs 4.60 1 Kgs 1748.00
T1 / 2013-14) Sub Total of - A Err:509
B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled- 0.167 day 564.00 1 day 94.19
S.No:11)
2nd Class Mason ( labour-R&B-Semi skilled- 0.167 day 540.00 1 day 90.18
S.N.44)
Mazdoor (Both Men & Women) (Labour -Irrigation- 5.600 day 510.00 1 day 2856.00
Unskilled-S.No.3) Sub Total of - B 3040.37
C. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity 1.333 hour 397.50 1 hour 529.87
(Hire Charges-Irrigation
Vibrator S.No16)
hire charges ( hire- irrigation-S.N.41) 1.333 hour 205.00 1 hour 273.27
Water (including for curing) (Irrigation SSR- 1.20 kl 98.00 1 kl 117.60
S.No:M189) Sub Total of - C 920.74
BASIC COST per 1 cum Err:509
D. Overheads & Contractors Profit 14% Err:509
sub total Err:509
Add VAT @ 0% Err:509
Add Labour Cess @ 14% Err:509
Total Err:509
Rate per One Cum Rs Err:509

a Columns up to 3.66 Mts unsupported height above GL


RCC-M-25- Design Mix 1.00 Cum Err:509 1 Cum Err:509
Centering charges ,Pg No.106 to 111 of Bld.SSR 1.00 Cum 0.00 1 Cum 0.00
Labour charges Pg No.106 to 111 of Bld.SSR 1.00 Cum 0.00 1 Cum 0.00
Add Labour component @ 20% 0.00
Basic Cost Rs Err:509
Overheads & Contractors Profit 14% Err:509
sub total Err:509
Add VAT @ 0% Err:509
447524687.xlsx - data-Road
Add Labour Cess @ 14%
Page 1705 of 2191 Err:509
Rate per One Cum Rs Err:509

20 BLD-CSTN-3-7-(24) Using Concrete mixture all works up to Plinth Level ; Plain Cement concrete nominal mix
(1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage
charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top
surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:
Cement 129.60 Kg 4.60 1 Kg 596.16
Coarse aggregate 40mm graded 0.90 Cum Err:509 1 Cum Err:509
Fine aggregate (Sand) 0.45 Cum 1303.00 1 Cum 586.35
Water (including for curing) 1.20 Kl 98.00 1 Kl 117.60
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity 1 hour 397.50 1 hour 397.50
B. LABOUR:
Mason 1st class 0.10 day 564.00 1 day 56.40
Mazdoor (unskilled) 1.39 day 510.00 1 day 708.90
Sub - Total Rs Err:509
c.Overheads & Contractors Profit 14% Err:509
Add VAT @ 0% Err:509
Add Labour Cess @ 14% Err:509
Grand Total Err:509
Rate per One Cum Rs Err:509

21 BLD-CSTN-5-2 (40) : Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor
1:4 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of
Seigniorage charges on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift
charges , curing charges etc., complete for finished item of work
A. MATERIALS:
Cement 72.00 Kg 4.60 1 Kg 331.20
Ground moulded size 23x11x7 Cm - (1:4)

Bricks traditional size 23 x 11 x 7 cms 2nd class 512 Nos 5.70 1000 Nos 2.92
Fine aggregate (Sand) 0.20 Cum 1303.00 1 Cum 260.60
Sub Total of - A 594.72
B. LABOUR:
Mason 1st class 0.24 day. 564.00 1 day. 135.36
Mason 2nd class 0.56 day. 540.00 1 day. 302.40
Mazdoor (unskilled) 1.89 day. 510.00 1 day. 963.90
Sub Total of - B 1401.66
Total A+B Rs 1996.38
c.Overheads & Contractors Profit 14% 271.81
Add VAT @ 0% 0.00
Add Labour Cess @ 14% 271.81
Grand Total 2540.00
Rate per One Cum Rs 2540.00

22 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level: Plain Cement concrete nominal mix m-20
(Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage
charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top
surface to the required level curing etc., complete for finished item of work with nomonal reinforcement

Unit : 1cum
A. MATERIALS:
Cement 330.00 Kg 4.60 1 Kg 1518.00
Coarse aggregate 20mm graded 0.90 Cum Err:509 1 Cum Err:509
Fine aggregate (Sand) 0.45 Cum 1303.00 1 Cum 586.35
Water (including for curing) 1.20 Kl 98.00 1 Kl 117.60

447524687.xlsx - data-Road
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity Page 1706 of 21911 hour 397.50 1 hour 397.50
B. LABOUR:
Mason 1st class 0.10 day 564.00 1 day 56.40
Mazdoor (unskilled) 1.39 day 510.00 1 day 708.90
Sub - Total Rs Err:509
c.Overheads & Contractors Profit 14% Err:509
Add VAT @ 0% Err:509
Add Labour Cess @ 14% Err:509
Grand Total Err:509
Rate per One Cum Rs Err:509

23 BLD-CSTN-8-1-(76): Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and
conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all
operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for
finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:3) 0.15 Cum 3877.65 1 Cum 581.65
B. LABOUR:
Mason 1st class 0.60 day 564.00 1 day 338.40
Mazdoor (unskilled) 0.96 day 510.00 1 day 489.60
Total A+B Rs 1409.65
C.Overheads & Contractors Profit 14% 191.92
1601.57
Add VAT @ 0% 0.00
Rate per 10 Sqm Rs 1601.57

24 Supply and fixing of 40 mm thick polished black Kadapa stone for Baffle wall including labour charges for lifting and
fixing the stone in position at all levels:
Kadapa slab 40 mm thick and size not less than 1.05 Sqm #REF! 1 Sqm #REF!
0.457 M x 0.457 M (BMT-B.01) item 22 Pg.
Labour charges for lifting & fixing in position @ 20% #REF!
#REF!
over heads & contractors profit 14% #REF!
sub total #REF!
Add VAT @ 0% #REF!
Rate per 1 Sqm Rs #REF!

25 Carting of surplus excavated rock from the site to a distance suitable including loading, unloading charges, cost &
conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete.
a Rock/CC
Page No.328 of SSR, Conveyance rates - 5.00 Km 1 cum 57.10 1 Cum 57.10
VAT & Labour cess. 0% 0.00
Rate per 1 Cum Rs 57.10

b Earth
Page No.124 of SSR, Conveyance rates - 5.00 Km 1 cum 57.10 1 Cum 57.10
VAT & Labour cess. 0% 0.00
Rate per 1 Cum Rs 57.10

26 Bailing out water from the pipe line trenches with oil engine driven pump sets, including hire charges, fuel charges
and wages for Driver and Helper etc, complete,
Basic rate (item No.26/(a)/Pg 6 of PH SSR (PH 1 Hp.hr #REF! 1 Hp.hr #REF!
items)
Total Rs #REF!
Overheads & Contractors Profit 14% #REF!
VAT & Labour cess. 0% #REF!
Rate per 1HPhr Rs #REF!

447524687.xlsx - data-Road
24 RBR-FNDN-4-C-ii ; Providing concrete for plain/reinforced concrete in open foundations using 20 mm & 10mm
Page 1707 of 2191
nominal size/ Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration
including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
MORD and 1500, 1700 & 2100 MORTH.
Unit 1 Cum
R.C.C grade M 20 (Design Mix) using 20 mm
Graded Metal (MORTH)
CASE I : Using Concrete Mixer
Unit = cum
(a) Material
Cement 0.35 t 4600.00 1t 1596.20
Coarse sand 0.45 cum 1303.00 1 cum 586.35
20 mm aggregate 0.54 cum Err:509 1 cum Err:509
10 mm aggregate 0.36 cum Err:509 1 cum Err:509
(b) Labour
Mate - day
Mason (1st Class) 0.10 day 564.00 1 day 56.40
Mazdoor (Unskilled) 1.39 day 510.00 1 day 708.90
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity 0.40 hr/cum 397.50 1 hr/cum 159.00
Generator 33 KVA 0.40 hour 1007.20 1 hour 402.88
Err:509
(d) Formwork @ 4% on (a+b+c) - 4% Err:509
Err:509
e&f) Overheads & Contractors Profit 14% Err:509
Rate per cum = a+b+c+d+e+f Err:509
Add VAT @ 0% Err:509
Rate per 1 Cum Err:509

25 RBR-FNDN-4-C-ii : Providing concrete for plain/reinforced concrete in open foundations using 20 mm & 10mm
nominal size/ Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration
including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
MORD and 1500, 1700 & 2100 MORTH. ( With Form work)
Unit 1 Cum
R.C.C grade M 20 (Design Mix) using 20 mm
Graded Metal (MORTH)
CASE I : Using Concrete Mixer
Unit = cum
(a) Material
Cement 0.35 t 4600.00 1t 1596.20
Coarse sand 0.45 cum 1303.00 1 cum 586.35
20 mm aggregate 0.54 cum Err:509 1 cum Err:509
10 mm aggregate 0.36 cum Err:509 1 cum Err:509
(b) Labour
Mate - day
Mason (1st Class) 0.10 day 564.00 1 day 56.40
Mazdoor (Unskilled) 1.39 day 510.00 1 day 708.90
(c) Machinery 0.00
Concrete mixer 0.4/0.28 cum capacity 0.40 hr/cum 397.50 1 hr/cum 159.00
Generator 33 KVA 0.40 hour 1007.20 1 hour 402.88
Err:509
(d) Formwork @ 4% on (a+b+c) - 4% Err:509
Err:509
e&f) Overheads & Contractors Profit 14% Err:509
Rate per cum = a+b+c+d+e+f Err:509
Add VAT @ 0% Err:509
Add Labour Cess @ 0% Err:509
Rate per 1 Cum Err:509

447524687.xlsx - data-Road
26 Supply and placing of the Design Mix ConcretePage corresponding
1708 of 2191 to IS 456 using WEIGH BATCHER / MIXER with
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including
seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges
such as weigh batching, machine mixing, pouring concrete by tremmy, curing etc., complete but excluding cost of
steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS
code from standard suppliers approved by the department including tremmy pumping, laying concrete, curing etc.
complete but excluding cost of steel and its fabrication charges for finished item of work

BORED CAST-IN-SITU UNDER REAMED PILES including Bore pile stem and under ream bulbs
ANY GRADE OF MIX AND UP TO 700 mm dia
Unit : 1cum
A. MATERIALS:
Cement 0.40 MT 4600.00 1 MT 1840.00
20mm HBG graded metal 0.80 cum Err:509 1 cum Err:509
Sand 0.40 cum 1303.00 1 cum 521.20
Water (including for curing) 1.20 kl 98.00 1 kl 117.60
B. LABOUR:
1st Class Mason 0.10 hour 564.00 1 hour 56.40
2nd Class Mason 0.20 hour 540.00 1 hour 108.00
Mazdoor (Both Men & Women) 3.45 day 510.00 1 day 1759.50
C. MACHINERY
Weigh Batcher Hire charges (Machine mixing) 1.00 day 397.50 1 day 397.50
charges Err:509
e&f) Overheads & Contractors Profit 14% Err:509
Err:509
Add VAT @ 0% Err:509
Rate per 1 Err:509

27 Manufacture,supply and delivery of RCC Socket and Spigot Pipes confirming to B.I.S. 458/2003 ex-Factory, ( Rate
per Meter of effective length) including Transportation,Central Excice Duty, Sales Tax but Excluding VAT
etc.complete.
RCC NP2 S/S pipe - 300mm dia
Basic Rate of RCC NP2 S/S pipe as per Table - 3 1 Rmt 435.00 1 Rmt 435.00
P1
of SSR Pg No.21 (PH-SSR )
C1 SSR Rate of Cement / MT 1 MT 4600.00
C2 Market Rate of Cement / MT 1 MT 4600.00
Wc Cement required per 1 Rmt 10.80 Kg
R1 Variation in Cement Cost ( 4100-4000)/1000*3.6 0.00
S1 SSR Rate of MS rods / MT 1 MT 46000.00
S2 Market Rate of MS rods/ MT 1 MT 46000.00
Ws MS rods required per 1 Rmt 1.57 Kg 0.00
Variation in MS rods Cost ( 42500-
R2 41000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 ) 435.00
Total lead 10 Km
Rate up to 5 Kms Lead 4.00 4.00
Rate for every additional 1 KM lead or part thereof 0.12 0.60

Cost of pipe per 1 Rmt including transport 439.60


Add over heads on pipe 14% 59.23
Add CED @ 12.36% 0.00% 0.00
Add ST @ 5% 0.00% 0.00
Add VAT @ 0% 0.00
Cost of pipe per 1 Rmt 498.83

28 Manufacture,supply and delivery of Rubber rings to suit RCC Socket and Spigot Pipes confirming to B.I.S. 5382/
1985 (RATE PER EACH RUBBER RING) including Transportation,Central Excice Duty, Sales Tax but Excluding VAT
etc.complete.
Rubber Ring to suit RCC NP2 S/S pipe - 300mm
dia
Basic Rate of RCC NP2 S/S pipe as per Table - 5 1 No 101.00 1 No 101.00
of SSR Pg No.23 (part - IV )
Add over heads 13.62% 13.75
Add CED @ 12.36% 0.00% 0.00
447524687.xlsx - data-Road
Add ST @ 5% 0.00%
Page 1709 of 2191 0.00
Cost of Each Rubber Ring 114.75

Sub Analysis : (Basic Data)

*
OBSERVED DATA FOR TESTING OF 450 MM DIA PSC MAIN : Pumping main to Hydralic field test pressure
including transportation of Water with minimum lead of 500 M
(Length = 500 Mts) taking out put / 500 Mts. Unit
= 1 Rmt.
Labour
Fitters (2 x 3 days)
Fitters I Class 3.000 day 564.00 1 day 1692.00
Fitters II Class 3.000 day 540.00 1 day 1620.00
Machinery
Hire chargers for Hydralic field test pressure testing 3.000 days 1200.00 1 days 3600.00
including transportation of water @ Rs. 1200/-
(1000+200) / day
Materials
Pressure guage 0.050 Nos 500.00 1 Nos 25.00
3/4" G.I. Pipe (20 mm) cost vide ( BMW-F.81 - BMW- 3.000 RM #REF! 1 RM #REF!
Specials 1 Ls 500.00 1 Ls 500.00
Dummies 0.100 No. 1500.00 1 Each 150.00
Diesel (2 Lts. / Hr) 30 Hrs.(item No.4 of Pg.22) 60.000 Lts. #REF! 1 Lts. #REF!
(T) Total Rate per 500 Mts. #REF!
(r) Rate per 1 Rmt for 450 mm dia #REF!
(R) Rate per 1 Rmt for 10 mm dia = (10/450) x r #REF!

28 Lowering the RCC S/S pipes carefully into ready made the trenches laying them true to alignment and gradient,
jointing with rubber rings and testing including filling with water with a water lead upto 500 meters including cost of
rubber rings as per BIS No. 783/1985
300 mm dia 300 mm dia
a) Labour
Mason 1st class 1.750 day 564.00 1 day 987.00
Mason 2nd class 4.140 day 540.00 1 day 2235.60
Man mazdoor 11.600 day 510.00 1 day 5916.00
Woman mazdoor(water carrier) 2.300 day 510.00 1 day 1173.00
10311.60
b) Material
Rubber rings conforming BIS 5382/1985-including 40.000 each 101.00 1 each 4040.00
CED & ST but excluding Contractors profit
c) Testing
Testing of Pipelines with required pressure as per 100.000 rm 1 rm 0.00
relevant IS Specification including filling with water
with a water lead upto 500 M, including hire
charges of testing equipment, labour and Materials
needed for testing (as per Sub Analysis 2 A)

(d) Total = a+b+c 14351.60


(e) Add for water charges @ 1% on Labour & 103.12
Testing Charges
(f) Total = d+e 14454.72
(g) Overheads & Contractors Profit 13.62% 1968.01
(h) Cost for 100 rmt (f+g) 16422.73
Rate per rmt = h/100 164.23
Rate per 1 Rmt Rs 164.23

Total cost for 300mm dia RCC NP2 class pipe including lowering, laying and jointing/ 1 Rmt 663.06

29 Providing pumping mains with the following DI pipes of K9 class as per ISI with spigot and socket ends, with all
necessary fittings as per IS 3114, including cost of DI pipes and specials and rubber rings, lowering, laying, jointing
and testing to required pressure including cost and conveyance of all materials to the site, labour charges etc., etc.
complete. ( Rates are inclusive of CP & OH )
a 100mm dia.DI K9 class (per Rmt)
Basic rate of DI pipe as per separate sheet 1 Rmt 1262.27 1 Rmt 1262.27
447524687.xlsx - data-Road
Cost of Rubber gasket ( Rate/5.00Rmt) 0.20 No
Page 1710 of 2191 105.91 1 No 21.18
Lowering Charges as per PH data 1 Rmt 28.24 1 Rmt 28.24
Jointing charges ( Rate/5.00 Rmt) 0.20 No 87.85 1 No 17.57
Total 1329.26
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt Rs 1329.26

b 150mm dia.DI K9 (per Rmt)


Basic rate of DI pipe as per separate sheet 1 Rmt 1867.82 1 Rmt 1867.82
Cost of Rubber gasket ( Rate/5.00Rmt) 0.20 No 126.14 1 No 25.23
Lowering Charges 1 Rmt 46.01 1 Rmt 46.01
Jointing charges ( Rate/5.00 Rmt) 0.20 No 109.67 1 No 21.93
Total 1960.99
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt Rs 1960.99

c 200mm dia.DI K9 (per Rmt)


Basic rate of DI pipe as per separate sheet 1 Rmt #REF! 1 Rmt #REF!
Cost of Rubber gasket ( Rate/5.00Rmt) 0.20 No #REF! 1 No #REF!
Lowering Charges 1 Rmt #REF! 1 Rmt #REF!
Jointing charges ( Rate/5.00 Rmt) 0.20 No 0.00 1 No 0.00
Total #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!

c 250mm dia.DI K9 (per Rmt)


Basic rate of DI pipe as per separate sheet 1 Rmt #REF! 1 Rmt #REF!
Cost of Rubber gasket ( Rate/5.00Rmt) 0.20 No #REF! 1 No #REF!
Lowering Charges 1 Rmt #REF! 1 Rmt #REF!
Jointing charges ( Rate/6.00 Rmt) 0.20 No 0.00 1 No 0.00
Total #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!

b 300mm dia.DI K9 (per Rmt)


Basic rate of DI pipe as per separate sheet 1 Rmt #REF! 1 Rmt #REF!
Cost of Rubber gasket ( Rate/5.00Rmt) 0.20 No #REF! 1 No #REF!
Lowering Charges 1 Rmt #REF! 1 Rmt #REF!
Jointing charges ( Rate/5.00 Rmt) 0.20 No 0.00 1 No 0.00
Total #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!

b 350mm dia.DI K9 (per Rmt)


Basic rate of DI pipe as per separate sheet 1 Rmt #REF! 1 Rmt #REF!
Cost of Rubber gasket ( Rate/5.00Rmt) 0.20 No #REF! 1 No #REF!
Lowering Charges 1 Rmt #REF! 1 Rmt #REF!
Jointing charges ( Rate/5.00 Rmt) 0.20 No 0.00 1 No 0.00
Total #REF!

447524687.xlsx - data-Road
VAT & Labour cess. 0%
Page 1711 of 2191 #REF!
Rate per 1 Rmt Rs #REF!

b 400mm dia.DI K9 (per Rmt)


Basic rate of DI pipe as per separate sheet 1 Rmt #REF! 1 Rmt #REF!
Cost of Rubber gasket ( Rate/5.00Rmt) 0.20 No #REF! 1 No #REF!
Lowering Charges 1 Rmt #REF! 1 Rmt #REF!
Jointing charges ( Rate/5.00 Rmt) 0.20 No 0.00 1 No 0.00
Total #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!

c 500mm dia.DI K9 (per Rmt)


Basic rate of DI pipe as per separate sheet 1 Rmt 8653.98 1 Rmt 8653.98
Cost of Rubber gasket ( Rate/5.00Rmt) 0.20 No 659.26 1 No 131.85
Lowering Charges 1 Rmt 252.30 1 Rmt 252.30
Jointing charges ( Rate/5.00 Rmt) 0.20 No 262.40 1 No 52.48
Total 9090.61
VAT & Labour cess. 0% 0.00
Rate per 1 Rmt Rs 9090.61

30 Providing road crossing pipes with R.C.C. NP 2 class socket and spigot pipes conforming to B.I.S. 458/1988
(rate for meter for effective length) including earth work excavation, Lowering the RCC pipes carefully into the
trenches, laying them true to the alignment and gradient, jointing with rubber rings and refilling the trenches with
excavated soils etc., including cost and conveyance of all material and all labour charges and all taxes like ,CED, ST
etc., but excluding VAT,
Dia of the Pipe 300 mm
Output 10.00 Rmt
cost of RCC Pipe as per data sheet 10.00 Rmt 498.83 1 Rmt 4988.30
Lowering and jointing charges 10.00 Rmt 164.23 1 Rmt 1642.30
6630.60
Sub Total 6630.60
Overheads & Contractors Profit 0.00% 0.00
Cost for 10.00 Rmt 6630.60
Rate per 1 Rmt 663.06
Rate per 1 Rmt Rs 663.06

31 Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with socket spigot ends confirming to
I.S.: 8329/2000 in standard working lengths of 4,5,5.5 & 6 meterfor classification K7/ K9 suitable for push on joint
( Rubber Gasket D jointing) with cement mortar lining inside the pipes with out side Zinc coating. Rates are including
Transportationand CED and ST etc,. complete.
DI K9 S/S pipe - 300mm dia P2 = P1+ (R2 - R1)/ 1000 x M x 0.96

Basic Rate of DI K9 S/S pipe as per Table - 22 (1) 1 Rmt 3561.00 1 Rmt 3561.00
P1
of SSR Pg No.101 (part - IV )
C1 SSR Rate of Pig Iron / MT 1 MT 35000.00
C2 Market Rate of Pig Iron / MT 1 MT 35000.00
Wc Weight of Pipe per 1 Rmt 54.18 Kg
Variation in Pig Iron Cost ( 27500- 0.00
R1 27500)/1000*13.27
Actual Rate of Pipe per Rmt (R1+R2 ) 3561.00
Total lead 150 Km
Rate for every 1 KM lead 0.66 99.00
Cost of pipe per 1 Rmt including transport 3660.00
Add over heads on pipe 13.62% 498.31
Add CED @ 12.36% 0.00% 0.00
Add ST @ 5% 0.00% 0.00
Cost of pipe per 1 Rmt 4158.31

447524687.xlsx - data-Road
32 Manufacture as per bis 12820/89 with S.B.R. quality
Page rubber confirming to BIS: 5382/85, supply and delivery of rubber
1712 of 2191
gaskets suitable for C.I/ D.I. S/S pipes anywhere in A.P. including cost of material, loading, incidental handling with
companys standard packing, transportation, unloading & stacking, central excise duty but excluding VAT etc.,
complete.
Rubber Gasket to suit 100mm DI S/S pipe
-100mm
Basic Rate diaas per Table - 24 of SSR Pg No.108 1 No 295.00 1 No 295.00
(part - IV )
Add over heads 14% 40.16
Add CED @ 12.36% 0.00% 0.00
Add ST @ 5% 0% 0.00
Cost of Each Rubber Ring 335.16

33 Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with socket spigot ends confirming to
I.S.: 8329/2000 in standard working lengths of 4,5,5.5 & 6 meterfor classification K7/ K9 suitable for push on joint
( Rubber Gasket D jointing) with cement mortar lining inside the pipes with out side Zinc coating. Rates are including
Transportationand CED and ST etc,. complete.
DI K9 S/S pipe - 350mm dia P2 = P1+ (R2 - R1)/ 1000 x M x 0.96

Basic Rate of DI K9 S/S pipe as per Table - 22 (1) 1 Rmt 4438.00 1 Rmt 4438.00
P1
of SSR Pg No.101 (part - IV )
C1 SSR Rate of Pig Iron / MT 1 MT 35000.00
C2 Market Rate of Pig Iron / MT 1 MT 35000.00
Wc Weight of Pipe per 1 Rmt 67.45 Kg
R1 Variation in Pig Iron Cost ( 29750- 0.00
29500)/1000*13.27
Actual Rate of Pipe per Rmt (R1+R2 ) 4438.00
Total lead 150 Km
Rate for every 1 KM lead 0.88 132.00
Cost of pipe per 1 Rmt including transport 4570.00
Add over heads on pipe 14% 622.21
Add CED @ 12.36% 0.00% 0.00
Add ST @ 5% 0% 0.00
Cost of pipe per 1 Rmt 5192.21

34 Manufacture as per bis 12820/89 with S.B.R. quality rubber confirming to BIS: 5382/85, supply and delivery of rubber
gaskets suitable for C.I/ D.I. S/S pipes anywhere in A.P. including cost of material, loading, incidental handling with
companys standard packing, transportation, unloading & stacking, central excise duty but excluding VAT etc.,
complete.
Rubber Gasket to suit 350mm DI S/S pipe
-350mm
Basic Rate diaas per Table - 24 of SSR Pg No.108 1 No 374.00 1 No 374.00
(part - IV )
Add over heads 14% 50.92
Add CED @ 12.36% 0.00% 0.00
Add ST @ 5% 0% 0.00
Cost of Each Rubber Ring 424.92

35 Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with socket spigot ends confirming to
I.S.: 8329/2000 in standard working lengths of 4,5,5.5 & 6 meterfor classification K7/ K9 suitable for push on joint
( Rubber Gasket D jointing) with cement mortar lining inside the pipes with out side Zinc coating. Rates are including
Transportationand CED and ST etc,. complete.
DI K9 S/S pipe - 400mm dia P2 = P1+ (R2 - R1)/ 1000 x M x 0.96

Basic Rate of DI K9 S/S pipe as per Table - 22 (1) 1 Rmt 5350.00 1 Rmt 5350.00
P1
of SSR Pg No.101 (part - IV )
C1 SSR Rate of Pig Iron / MT 1 MT 35000.00
C2 Market Rate of Pig Iron / MT 1 MT 35000.00
Wc Weight of Pipe per 1 Rmt 80.91 Kg
Variation in Pig Iron Cost ( 29750- 0.00
R1 29500)/1000*13.27
Actual Rate of Pipe per Rmt (R1+R2 ) 5350.00
Total lead 150 Km
Rate for every 1 KM lead 0.99 148.50
Cost of pipe per 1 Rmt including transport 5498.50
Add over heads on pipe 13.62% 748.62
Add CED @ 12.36% 0.00% 0.00
Add ST @ 5% 0.00% 0.00
447524687.xlsx - data-Road
Cost of pipe per 1 Rmt Page 1713 of 2191 6247.12

36 Manufacture as per bis 12820/89 with S.B.R. quality rubber confirming to BIS: 5382/85, supply and delivery of rubber
gaskets suitable for C.I/ D.I. S/S pipes anywhere in A.P. including cost of material, loading, incidental handling with
companys standard packing, transportation, unloading & stacking, central excise duty but excluding VAT etc.,
complete.
Rubber Gasket to suit 400mm DI S/S pipe
Basic Rate as per Table - 24 of SSR Pg No.108 1 No 408.00 1 No 408.00
(part - IV )
Add over heads 14% 55.55
Add CED @ 12.36% 0% 0.00
Add ST @ 5% 0% 0.00
Cost of Each Rubber Ring 463.55

37 Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with socket spigot ends confirming to
I.S.: 8329/2000 in standard working lengths of 4,5,5.5 & 6 meterfor classification K7/ K9 suitable for push on joint
( Rubber Gasket D jointing) with cement mortar lining inside the pipes with out side Zinc coating. Rates are including
Transportationand CED and ST etc,. complete.
DI K9 S/S pipe - 450mm dia P2 = P1+ (R2 - R1)/ 1000 x M x 0.96

Basic Rate of DI K9 S/S pipe as per Table - 22 (1) 1 Rmt 6401.00 1 Rmt 6401.00
P1 of SSR Pg No.101 (part - IV )
C1 SSR Rate of Pig Iron / MT 1 MT 35000.00
C2 Market Rate of Pig Iron / MT 1 MT 35000.00
Wc Weight of Pipe per 1 Rmt 96.36 Kg
Variation in Pig Iron Cost ( 29750- 0.00
R1
29500)/1000*13.27
Actual Rate of Pipe per Rmt (R1+R2 ) 6401.00
Total lead 150 Km
Rate for every 1 KM lead 1.21 181.50
Cost of pipe per 1 Rmt including transport 6582.50
Add over heads on pipe 14% 896.21
Add CED @ 12.36% 0.00% 0.00
Add ST @ 5% 0% 0.00
Cost of pipe per 1 Rmt 7478.71

38 Manufacture as per bis 12820/89 with S.B.R. quality rubber confirming to BIS: 5382/85, supply and delivery of rubber
gaskets suitable for C.I/ D.I. S/S pipes anywhere in A.P. including cost of material, loading, incidental handling with
companys standard packing, transportation, unloading & stacking, central excise duty but excluding VAT etc.,
complete.
Rubber Gasket to suit 450mm DI S/S pipe
Basic Rate as per Table - 24 of SSR Pg No.108 1 No 439.00 1 No 439.00
(part - IV )
Add over heads 14% 59.77
Add CED @ 12.36% 0.00% 0.00
Add ST @ 5% 0% 0.00
Cost of Each Rubber Ring 498.77

39 Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with socket spigot ends confirming to
I.S.: 8329/2000 in standard working lengths of 4,5,5.5 & 6 meterfor classification K7/ K9 suitable for push on joint
( Rubber Gasket D jointing) with cement mortar lining inside the pipes with out side Zinc coating. Rates are including
Transportationand CED and ST etc,. complete.
DI K9 S/S pipe - 500mm dia P2 = P1+ (R2 - R1)/ 1000 x M x 0.96

Basic Rate of DI K9 S/S pipe as per Table - 22 (1) 1 Rmt 7447.00 1 Rmt 7447.00
P1
of SSR Pg No.101 (part - IV )
C1 SSR Rate of Pig Iron / MT 1 MT 35000.00
C2 Market Rate of Pig Iron / MT 1 MT 35000.00
Wc Weight of Pipe per 1 Rmt 112.00 Kg
R1 Variation in Pig Iron Cost ( 29750- 0.00
29500)/1000*13.27
Actual Rate of Pipe per Rmt (R1+R2 ) 7447.00
Total lead 150 Km
Rate for every 1 KM lead 1.43 214.50
Cost of pipe per 1 Rmt including transport 7661.50
447524687.xlsx - data-Road
Add over heads on pipe 14%
Page 1714 of 2191 1043.11
Add CED @ 12.36% 0.00% 0.00
Add ST @ 5% 0% 0.00
Cost of pipe per 1 Rmt 8704.61

40 Manufacture as per bis 12820/89 with S.B.R. quality rubber confirming to BIS: 5382/85, supply and delivery of rubber
gaskets suitable for C.I/ D.I. S/S pipes anywhere in A.P. including cost of material, loading, incidental handling with
companys standard packing, transportation, unloading & stacking, central excise duty but excluding VAT etc.,
complete.
Rubber Gasket to suit 500mm DI S/S pipe
Basic Rate as per Table - 24 of SSR Pg No.108 1 No 609.00 1 No 609.00
(part - IV )
Add over heads 14% 82.92
Add CED @ 12.36% 0.00% 0.00
Add ST @ 5% 0% 0.00
Cost of Each Rubber Ring 691.92
Sub Analysis

*
Lowering C.I. Pipes, A class and specials with s/s
ends carefully into trench and laying them true to
alignment and gradient including all sundries but
excluding cost and conveyance of pipes from
source of supply. (Reference to specifications. BIS
No.3114/94)
Assumtion 10 m
200 mm dia CI pipes 5m long (class ‘A’)
Weight = 2 x 257 kgs = 514 kgs = 5.14 quintal
(a) LABOUR: (including LC)
Plumber 1st class 0.102 day 648.00 1 day 66.10
Plumber 2nd class 0.238 day 540.00 1 day 128.52
Man mazdoor 1.330 day 510.00 1 day 678.30
(b) Cost for 10 metres 872.92
Rate per metre = b/10 87.29
Rate for 1 kg = b/514 1.700

41 PHE-LCIS-1 : Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with s/s ends carefully into trenches
and laying them true to alignment and gradient including all sundries but excluding cost and conveyance of pipes
from source of supply (Ref to specifications. BIS No.3114/1994)
Note : The Labour charges for cost of Lowering & Laying per 1 kg weight shall be as per sub-analysis made for 200
mm dia CI Pipes S/s ends.
Details of cost for 5m

a 300 mm dia pipe


Weight of 5m length = (412+450+487)/3 = 449.67
kgs
(a) Labour charges for laying 449.670 Kg 1.700 1 Kg 764.44
(b) Overheads & Contractors Profit 14% 104.08
(c) Cost for 5 metres = a+b 868.52
Rate per metre = c/5 173.70
Rate per 1 Rmt Rs 173.70

b 350 mm dia pipe


Weight of 5m length =(519+563+610)/3=564
(a) Labour charges for laying 564.000 Kg 1.700 1 Kg 958.80
(b) Overheads & Contractors Profit 14% 130.54
(c) Cost for 5 metres = a+b 1089.34
Rate per metre = c/5 217.87
Rate per 1 Rmt Rs 217.87

c 400 mm dia pipe


Weight of 5m length =(631+690+744)/3=688.33
(a) Labour charges for laying 688.330 Kg 1.700 1 Kg 1170.16
(b) Overheads & Contractors Profit 14% 159.32
(c) Cost for 5 metres = a+b 1329.48
Rate per metre = c/5 265.90
447524687.xlsx - data-Road
Rate per 1 Rmt
Page 1715 of 2191 Rs 265.90

d 450 mm dia pipe


Weight of 5m length =(761+836+901)/3=832.67
(a) Labour charges for laying 832.670 Kg 1.700 1 Kg 1415.54
(b) Overheads & Contractors Profit 14% 192.73
(c) Cost for 5 metres = a+b 1608.27
Rate per metre = c/5 321.65
Rate per 1 Rmt Rs 321.65

e 500 mm dia pipe


Weight of 5m length =(892+971+1049)/3=970.67
(a) Labour charges for laying 970.670 Kg 1.700 1 Kg 1650.14
(b) Overheads & Contractors Profit 14% 224.67
(c) Cost for 5 metres = a+b 1874.81
Rate per metre = c/5 374.96
Rate per 1 Rmt Rs 374.96
Sub Analysis : (Basic Data)

*
OBSERVED DATA FOR TESTING OF 450 MM DIA PSC MAIN : Pumping main to Hydralic field test pressure
including transportation of Water with minimum lead of 500 M
(Length = 500 Mts) taking out put / 500 Mts. Unit = 1 Rmt.
Labour : ( including LC)
Fitters (2 x 3 days)
Fitters I Class ( Labour-Skilled- Irrigation-Sn.6) 3.000 day 648.00 1 day 1944.00
Fitters II Class 3.000 day 540.00 1 day 1620.00
Machinery
Hire chargers for Hydralic field test pressure testing 3.000 days 1200.00 1 days 3600.00
including transportation of water @ Rs. 1200/-
(1000+200) / day
Materials
Pressure guage 0.050 Nos 500.00 1 Nos 25.00
3/4" G.I. Pipe (20 mm) (168-33.00) 3.000 RM #REF! 1 RM #REF!
Specials 1 Ls 500.00 1 Ls 500.00
Dummies 0.100 No. 1500.00 1 Each 150.00
Diesel (2 Lts. / Hr) 30 Hrs.(item No.4 of Pg.22) 60.000 Lts. #REF! 1 Lts. #REF!
(T) Total Rate per 500 Mts. #REF!
(r) Rate per 1 Rmt for 450 mm dia #REF!
(R) Rate per 1 Rmt for 10 mm dia = (10/450) x r #REF!
Note : Proportionate Testing Charges may be arrived, keeping the diametre of pipe based on this analysis, for an
varities of pipes for various Dia Pipes.

42 PHE-JCIR-4 : Jointing C.I., D.I. pipes and fittings with rubber gasket (push-on-joint), excluding the cost of the
gasket but including all sundries filling with water, with a water lead up to 500m and testing to required pressure, etc.
complete Reference to specifications IS 3114/1994/12888/1987
Note : Rubber Gaskets shall be added seperately.

Details of cost for 10 Joints

a Jointing 300 mm dia DI pipe 300 mm dia


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled- 0.800 day 540.00 1 day 432.00
Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 1.200 day 510.00 1 day 612.00
1044.00
b) Material
Rubber gasket each
c) Testing
Testing of Pipelines with required pressure (as per 50.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e+f #REF!
447524687.xlsx - data-Road
(g) Overheads & Contractors Profit 14%
Page 1716 of 2191 #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!

b Jointing 350 mm dia DI pipe 350 mm dia


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled- 0.900 day 540.00 1 day 486.00
Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 1.500 day 510.00 1 day 765.00
1251.00
b) Material
Rubber gasket each
c) Testing
Testing of Pipelines with required pressure (as per 50.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e+f #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!

c Jointing 400 mm dia DI pipe 400 mm dia


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled- 1.000 day 540.00 1 day 540.00
Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 1.500 day 510.00 1 day 765.00
1305.00
b) Material
Rubber gasket each
c) Testing
Testing of Pipelines with required pressure (as per 50.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e+f #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!

d Jointing 450 mm dia DI pipe 450 mm dia


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled- 1.200 day 540.00 1 day 648.00
Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 1.700 day 510.00 1 day 867.00
1515.00
b) Material
Rubber gasket each
c) Testing
Testing of Pipelines with required pressure (as per 50.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e+f #REF!

447524687.xlsx - data-Road
(g) Overheads & Contractors Profit 14%
Page 1717 of 2191 #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!

e Jointing 500 mm dia DI pipe 500 mm dia


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled- 1.300 day 540.00 1 day 702.00
Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3) 1.800 day 510.00 1 day 918.00
1620.00
b) Material
Rubber gasket each
c) Testing
Testing of Pipelines with required pressure (as per 50.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e+f #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 10 joints (f+g) #REF!
Rate per joint = h/10 #REF!
VAT & Labour cess. 0% #REF!
Rate per each cut Rs #REF!

43 Centrifugally cast (spun) Ductile Iron fittings conforming to IS:9523/2000 having dimentions as per table. the rates
mentioned here under are for fittings, Zinc coated externally with inside mortar lining (with finishing as per class 13/
IS 9523/2000) ( ex-works) including transportation, taxes and duties etc.

Rate as per Table 24 , Page No.106 of the SSR 1 Kg 88.00 1 Kg 88.00


part-IV
Add Transportation charges @ 5% 5% 4.40
Add over heads on pipe 14% 12.94
Add CED @ 12.36% 12.36% 10.88
Add ST @ 5% 14.50% 14.34
Cost per 1 Kg 130.56

* Data ( as per Irrigation data)

Thickness of lining : 100 mm


Cylinder type Mechanical paver with one side paving arrangement considered
Batchning plant shifting & re-erection considered at 10 Km interval.

Average output of mechanical paver / hour : 100 Sqm


Quantity of CC for paver / hour (100 x 0.10) : 10 cum
Add extra qty for curvature at Bed & side junction& lug 10% : 1 cum
corrected qty of concrete for 100 sqm : 11 cum
Rated capacity of batching plant required for 8.48 cum/hour output :
(11 x 60 / 50 / 0.7) : 18.86 cum/hr
Deploy 20 cum per hour capacity Batching & mixing plant
4 cum capacity Transit mixers considered for conveyance CC from BP to paver side
Round trip cycle time for transit mixer:
Turning & spotting at BP : 3 min
Loading CC : 10 min
Conveying from BP to Paver site (average) : 15 min
Turning & Spotting at Paver site : 3 min
Unloading concrete at paver site : 10 min
Return trip to BP ( average ) 12 min
Total 53 min
447524687.xlsx - data-Road
with 50 min/hour working output of transit mixer / Page
hour1718 of 2191 : 3.77 cum
Hourly requirement of concrete for 80 Sqm/hour lining : 11 cum
No. of Transit mixers to match 11 cum /hr (11.00 / 3.77) : 3 Nos.
Deploy 3 Transit mixers of 4 cum capacity for conveyance of CC from BP to Paver site
Deploy 1 water tanker and 2 pumps (1 at BP site and 1 at Water source) for water requirement
at BP site and at linging site.
Deploy about 50 KVA capacity DG set with all accessories at BP site
Deploy about 30 KVA capacity DG set with all accessories at paver site
Daily progress of lining @ 100 sqm / hour : 800 sqm
Quantity of concrete for 800 Sqm : 88 cum
Quantity of 20 to 10 mm CA @ 0.52 cum / cum of CC : 45.76 Cum
Quantity of 10 to 4.75 mm CA @ 0.28 cum / cum of CC : 24.64 cum
Quantity of fine aggregate @ 0.45 cum/ cum of CC : 39.6 cum
Quantity of cement @ 300Kg / cum of CC : 26400 kg
Super paistizer : 105.6 kg
PVC sealing strip : 3 x 3 grid 533
Deploy 3 mazdoor at BP site for feeding cement to cement bin / silo
Deploy 2 mazdoors at BP site for miscellaneous works
Consider 0.5 cum shovel for 2 hours for pushing CA / FA to BP stock pile area.
Consider 2 Masons, 10 mazdoors at paver site for laying & curing CC
Use rate of materials:
Cost of paving cylinder @ Rs. #REF! / Each Rs. #REF!
Life of paving cylinder in Sqm of lining : 40000
Use rate of paving cylinder / sqm (cost / life) Rs. #REF!
Add for repair charges at 25% Rs. #REF!
Use rate of paving cylinder / sqm including repairs Rs. #REF!

DATA - SEWER LINES


1 Cutting open BT road surface (as well as asphalt concrete upto 75 mm thick ) including water bound macadam and
stacking of excavated materials for pipe line trench work. as directed by the departmental officers.
Rate as per PH-SSR item no 25a, Pg.6 1 Sqm #REF! 10 Sqm #REF!
Add for Municipal Allowance at 20% #REF!
Overheads & Contractors Profit 14% #REF!
Total #REF!
Add Sundries #REF!
Rate per 1 Sqm Rs #REF!
Add VAT & Labour cess etc. @ 0% #REF!
Cost per 1 Sqm #REF!
2 Cutting open C.C. road surface including stacking of excavated materials for pipe line trench work. as directed by the
departmental officers.
Rate as per PH-SSR item no 25b,Pg.6 1 Cum #REF! 1 Cum #REF!
Add for Municipal Allowance at 20% #REF!
Overheads & Contractors Profit 14% #REF!
Total #REF!
Add Sundries #REF!
Rate per 1 Cum Rs #REF!
Add VAT & Labour cess etc. @ 0% #REF!
Cost per 1 Cum #REF!

3 Cutting open water bound macadam road including soiling and stacking of excavated materials for pipe line trench
work. as directed by the departmental officers.
Rate as per PH-SSR item no 25 c,Pg.6 1 Cum #REF! 1 Cum #REF!
Add for Municipal Allowance at 20% #REF!
Overheads & Contractors Profit 14% #REF!
447524687.xlsx - data-Road
Total Page 1719 of 2191 #REF!
Add Sundries #REF!
Rate per 1 Cum Rs #REF!
Add VAT & Labour cess etc. @ 0% #REF!
Rate per 1 Cum #REF!

4 RBR-FNDN-1- (I-A-i) In ordinary soils, by Manual means: Earthwork excavation in all kinds of soil for Pipe line
trenches as per drawings and technical specifications including setting out, construction of shoring and bracing,
removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 304
MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is
possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water
lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of
remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Lines
by manual means.

Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD and 301.2.1 of MORT&H
I-A In ordinary soils, by Manual means for Pipe line Trenches
i up to 3.00 Mts depth below GL out put 10.00 Cum
a)  Labour
Mate ( Labour- R&B-S.N.71) 0 Nos. 540.00 1 Each 0.00
Mazdoor (Unskilled) ( Labour-Irrigation-Unskilled- 3.64 Nos. 510.00 1 Each 1856.40
S.N.3) 1856.40
c&d) Overheads & Contractors Profit @ 14% 252.75
add extra for pipe line trenches @ 75% 1392.3
Cost for 240 cum = a+b+c+d 3501.45
Rate per cum = (a+b+c+d)/10 350.15
Rate per 1 Cum excluding Dewatering Rs 350.15
Add VAT & Labour cess etc. @ 0% 0.00
Rate per 1 Cum excluding Dewatering 350.15

5 RBR-FNDN-1- (I-B-i) - In ordinary soils, by Mechanical means : Earthwork excavation in all kinds of soil for
Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and
bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical
Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility
services wherever it is possible during the execution and taking all precautionary measures in the restricted areas
for laying sewer/water lines including divertion of traffic and backfilling in trenches with excavated suitable material
and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete
for Pipe Lines by mechanical means.
I-B In ordinary soils by Mechanical means for Pipe line trenches
i up to 3.00 Mts depth below GL out put 240.0 Cum
a)  Labour
Mate ( Labour- R&B-S.N.71) 0 Nos. 540.00 1 Each 0.00
Mazdoor (Unskilled) ( Labour-Irrigation-Unskilled- 8.32 Nos. 510.00 1 Each 4243.20
S.N.3)
b) Machinery
Hydraulic Excavator 1 cum bucket capacity ( R& B 6.00 hours 2967.90 1 hours 17807.40
SSR Hire charges, item No.4)
Sub total 22050.60
c&d) Overheads & Contractors Profit 14% 3087.08
Cost for 240 cum = a+b+c+d 25137.68
Rate per cum = (a+b+c+d)/240 104.74
Rate per 1 Cum excluding Dewatering Rs 104.74
Add VAT & Labour cess etc. @ 0% 0.00
Rate per 1 Cum excluding Dewatering 104.74
Note: The cost of shoring and shuttering, where needed, may be added on cost of excavation for open foundation.

447524687.xlsx - data-Road
6 RBR-FNDN-1- (ii-A) - In ordinary soils, by Manual Page 1720means
of 2191 : Earthwork excavation in all kinds of soil for Pipe
line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing,
removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 304
MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is
possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water
lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of
remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Lines
by Manual means- from 3.00m to 6.00m below ground Level.

i RBR-FNDN--ii-A- 3.00 Mts to 6.00 Mts depth below GL out put 10.00 Cum
a)  Labour
Mate ( Labour- R&B-S.N.71) 0 Nos. 540.00 1 Each 0.00
Mazdoor (Unskilled) ( Labour-Irrigation-Unskilled- 4.68 Nos. 510.00 1 Each 2386.80
S.N.3) 2386.80
c&d) Overheads & Contractors Profit @ 14% 334.15
add extra for pipe line trenches @ 75% 1790.1
Cost for 240 cum = a+b+c+d 4511.05
Rate per cum = (a+b+c+d)/10 451.11
Rate per 1 Cum excluding Dewatering Rs 451.11
Add VAT & Labour cess etc. @ 0% 0.00
Rate per 1 Cum excluding Dewatering 451.11
7 RBR-FNDN-1- (ii-A) - In ordinary soils, by Mechanical means : Earthwork excavation in all kinds of soil for
Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and
bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical
Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility
services wherever it is possible during the execution and taking all precautionary measures in the restricted areas
for laying sewer/water lines including divertion of traffic and backfilling in trenches with excavated suitable material
and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete
for Pipe Lines by mechanical means - from 3.00m to 6.00m below ground Level.

ii RBR-FNDN--ii-B- 3.00 Mts to 6.00 Mts depth below GL out put 210.0 Cum
a) Labour
Mate ( Labour- R&B-S.N.71) 0 Nos. 540.00 1 Each 0.00
Mazdoor (Unskilled) ( Labour-Irrigation-Unskilled- 8.32 Nos. 510.00 1 Each 4243.20
S.N.3)
b) Machinery
Hydraulic Excavator 1 cum bucket capacity 6 hours 2967.90 1 hours 17807.40
Sub total 22050.60
c&d) Overheads & Contractors Profit 3087.08
Cost for 240 cum = a+b+c+d 25137.68
Rate per cum = (a+b+c+d)/240 119.7
Rate per 1 Cum excluding Dewatering Rs 119.70
Add VAT & Labour cess etc. @ 0% 0.00
Rate per 1 Cum excluding Dewatering 119.70
RBR-FNDN-B-iii- above 6.00 Mts depth below
iii out put 180.0 Cum
GL
a) Labour
Mate 0 Nos. 540.00 1 Each 0.00
Mazdoor (Unskilled) 10.40 Nos. 510.00 1 Each 5304.00
b) Machinery
Hydraulic Excavator 1 cum bucket capacity 6 hours 2967.90 1 hours 17807.40
Sub total 23111.40
c&d) Overheads & Contractors Profit 3235.6
Cost for 240 cum = a+b+c+d 26347.00
Rate per cum = (a+b+c+d)/240 146.37
Rate per 1 Cum excluding Dewatering Rs 146.37
Add VAT & Labour cess etc. @ 0% 0.00
Rate per 1 Cum excluding Dewatering 146.37

Ordinary rock (not requiring blasting)

447524687.xlsx - data-Road
8 RBR-FNDN-1- (iii) - In hard rock require blasting: Excavation
Page 1721 of 2191 in rocky soils by Machine require blasting :
Earthwork excavation in hard rock such as sheet rock and boulders required blasting for pipe line trenches
including, cost of blasting materials, duly taking all precautionary measures including all incidental and operational
charges etc., complete.
Upto 3 m depth including 1.5 m depth in hard rock out put 10.00 Cum
Unit = cum
Taking output = 10 cum
a)  Labour
Mate ( Labour- R&B-S.N.71) 0.00 Nos 540.00
Driller (labour R&B- S.N.31) 0.50 Nos 660.00 1 Nos 330.00
Blaster (labour -Irrigation-Skilled- S.N.3) 0.25 Nos 678.00 1 Nos 169.50
Mazdoor (Unskilled) ( Labour-Irrigation-Unskilled- 8.35 Nos 510.00 1 Nos 4258.50
S.N.3)
b) Machinery
Air compressor 210 cfm / 250 cfm with 2 jack 1 hour 1358.70 1 hour 1358.70
hammers ( Hire charges- Irrigation-S.N.3)
c) Materials
Gelatin 80 per cent -( M-104 -Irrigation SSR ), 3.50 No #REF! 1 No #REF!
pg.30
Electric Detonators @ 1 detonator for 2 gelatine 14.00 Nos #REF! 100 Nos #REF!
sticks of 285 gm each -(M-094 -Irrigation SSR)
Sub total #REF!
d) Overheads & Contractors Profit 14% #REF!
Cost for 10 cum = a+b+c+d #REF!
Cost for 1 cum #REF!
Rate per 1 Cum excluding Dewatering Rs #REF!
Add VAT & Labour cess etc. @ 0% #REF!
Rate per 1 Cum excluding Dewatering #REF!
Note : 1. Cost of dewatering @ 5 per cent of (a+b) may be added, where required as per site
condition.
2. No limitation of depth in MORTH

9 RBR-FNDN-1- (iv) - In hard rock blasting prohibited: Excavation in Hard rock (blasting prohibited) Upto 3 m
depth including 1.5 m depth in hard rock : Earthwork excavation in hard rock such as sheet rock and boulders in
habitant areas where conventional blasting can not be done for pipe line trenches, including all incidental and
operational charges etc., complete.
out put 10.00 Cum
a)  Labour
Mate 0.00 Nos 540.00 1 Nos 0.00
Mazdoor (Unskilled) 5.20 Nos 510.00 1 Nos 2652.00
b) Machinery
Air compressor 210 cfm / 250 cfm with 2 jack 6.00 hour 1358.70 1 hour 8152.20
hammers of pneumatic breaker at 1 cum per hour
sub total ; a+b 10804.20
c&d) Overheads & Contractors Profit 14% 1512.59
Cost for 10 cum = a+b+c+d 12316.79
Rate per cum = a+b+c+d+e)/10 1231.68
Rate per 1 Cum excluding Dewatering 1231.68
Add VAT & Labour cess etc. @ 0% 0.00
Rate per 1 Cum excluding Dewatering 1231.68

10 RBR-FNDN-1 -manual means : Earthwork excavation for structures in all types of soil as per drawing and technical
specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious
material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated
suitable material as per Technical Specification 305 MORD / 304 MORTH. for Sumps,Thrust blocks, Chambers
and Man Holes etc. by manual means,
Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD and 301.2.1 of MORT&H
Ordinary Soils : for Sumps, Thrust Blocks and Man Holes etc,.
up to 3.00 Mts depth below GL out put 10.00 Cum
a)  Labour
Mate 0 Nos. 540.00 1 Each 0.00
Mazdoor (Unskilled) 3.64 Nos. 510.00 1 Each 1856.40
447524687.xlsx - data-Road
Sub total Page 1722 of 2191 1856.40
c&d) Overheads & Contractors Profit 14% 259.9
Cost for 240 cum = a+b+c+d 2116.30
Rate per cum = (a+b+c+d)/10 211.63
Rate per 1 Cum excluding Dewatering Rs 211.63
Add VAT & Labour cess etc. @ 0% 0.00
Rate per 1 Cum excluding Dewatering 211.63

11 Carting of surplus excavated rock from the site to a suitable distance including loading, unloading charges, cost &
conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete.
a Rock/CC
Page No.328 of SSR, Conveyance rates - 5.00 Km 1 cu.m. 57.10 1 Cum 57.10
Add Sundries 0.00
Rate per 1 Cum Rs 57.10
Add VAT & Labour cess etc. @ 0% 0.00
Rate per 1 Cum 57.10

b Earth
Page No.124 of SSR, Conveyance rates - 5.00 Km 1 cu.m. 57.10 1 Cum 57.10
Add Sundries 0.00
Rate per 1 Cum Rs 57.10
Add VAT & Labour cess etc. @ 0% 0.00
Rate per 1 Cum 57.10

12 RBR-FNDN-2 : Collection, Supply and filling of Sand from approved quarry to work site and stacking at work site to
Dept. gauge for premeasurements including cost and convenyance of all material and all labour charges etc.
complete as per standard specifications. Clause 305.3.9 MORD & 304 MORTH
a) Labour
Mate 0.00 Nos 540.00 1 Nos 0.00
Mazdoor (Unskilled) 0.31 Nos 510.00 1 Nos 158.10
b) Material
Sand (C-Mat-Lead statement-S.No.1) 6.00 Cum 1303.00 1 Cum 7818.00
Sub total a+b 7976.10
c&d) Overheads & Contractors Profit 14% 1116.65
Rate per cum = a+b+c+d 9092.75
Rate per 6 Cum 9092.75
Rate per 1 Cum 1515.46
Add VAT & Labour cess etc. @ 0% 0.00
Rate per 1 Cum 1515.46

13 RBR-FNDN-2: Collection ,Supply and filling of Stone dust from approved quarry to work site and stacking at work
site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour charges etc.
complete as per standard specifications. Clause 305.3.9 MORD & 304 MORTH
Stone dust Filling out put 6.00 Cum
a) Material
Stone dust Filling (C-Mat-Lead statement-S.No.23) 6.00 Cum 618.70 1 Cum 3712.20
b)  Labour
Mate ( Labour- R&B-S.N.71) 0.00 Nos 540.00 1 Nos 0.00
Mazdoor (Unskilled) ( Labour-Irrigation-Unskilled- 0.31 Nos 510.00 1 Nos 158.10
S.N.3)
Sub Total 3870.30
b&c) Overheads & Contractors Profit 14% 526.94
Cost for 6 cum = a+b+c 4397.24
Rate per cum = (a+b+c)/6 732.87
VAT & Labour cess. 0% 0.00
Rate per 1 Cum 732.87

14 Supply and delivery of Salt Glazed Pipes of ISI make conforming to ISI 651 including cost and conveyance of
pipes i.e laoding at factory, transporation, unloading at site and stacking etc, complete
Cost of the pipes as per Pg. 114 of Sanitary and water supply section BSSR 2013-14
a 150mm dia SWG - SP-1
447524687.xlsx - data-Road
Supply of SWG SP-1 pipe conforming to ISI 651 -Page 1723 of 21911 Rmt #REF! 1 Rmt #REF!
6" dia (152.4mm) BMW-A.16/Pg-114
c&d) Overheads & Contractors Profit 14% #REF!
Total Rs. Per 1 Rmt #REF!
Add VAT & Labour cess etc. @ 0% #REF!
Rate per 1 Rmt #REF!

b 200mm dia SWG - SP-1


Supply of SWG SP-1 pipe conforming to ISI 651 - 1 Rmt #REF! 1 Rmt #REF!
8" dia (203.2mm) BMW-A.17/Pg-114
c&d) Overheads & Contractors Profit 14% #REF!
Total Rs. Per 1 Rmt #REF!
Add VAT & Labour cess etc. @ 0% #REF!
Rate per 1 Rmt #REF!

c 250mm dia SWG - SP-1


Supply of SWG SP-1 pipe conforming to ISI 651 - 1 Rmt #REF! 1 Rmt #REF!
10" dia (254 mm) BMW-A.18/Pg-114
c&d) Overheads & Contractors Profit 14% #REF!
Total Rs. Per 1 Rmt #REF!
Add VAT & Labour cess etc. @ 0% #REF!
Rate per 1 Rmt #REF!

d 300mm dia SWG - SP-1


Supply of SWG SP-1 pipe conforming to ISI 651 - 1 Rmt #REF! 1 Rmt #REF!
12" dia (300 mm) BMW-A.19/Pg-114
c&d) Overheads & Contractors Profit 14% #REF!
Total Rs. Per 1 Rmt #REF!
Add VAT & Labour cess etc. @ 0% #REF!
Rate per 1 Rmt #REF!

e 350mm dia SWG - SP-1


Supply of SWG SP-1 pipe conforming to ISI 651 - 1 Rmt #REF! 1 Rmt #REF!
14" dia (350 mm) BMW-A.20/Pg-114
c&d) Overheads & Contractors Profit 14% #REF!
Total Rs. Per 1 Rmt #REF!
Add VAT & Labour cess etc. @ 0% #REF!
Rate per 1 Rmt #REF!

f 400mm dia SWG - SP-1


Supply of SWG SP-1 pipe conforming to ISI 651 - 1 Rmt #REF! 1 Rmt #REF!
16" dia (400 mm) BMW-A.21/Pg-114
c&d) Overheads & Contractors Profit 14% #REF!
Total Rs. Per 1 Rmt #REF!
Add VAT & Labour cess etc. @ 0% #REF!
Rate per 1 Rmt #REF!

g 450mm dia SWG - SP-1


Supply of SWG SP-1 pipe conforming to ISI 651 - 1 Rmt #REF! 1 Rmt #REF!
18" dia (450 mm) BMW-A.22/Pg-114
c&d) Overheads & Contractors Profit 14% #REF!
Total Rs. Per 1 Rmt #REF!
Add VAT & Labour cess etc. @ 0% #REF!
Rate per 1 Rmt #REF!

15 PHE - LJSW-13: Lowering and laying in ready made trench true to alignment and gradient, jointing, and testing of
stone ware pipes including cost of jointing material such as cement mortar (1:1) proportion and hemp yarn but
excluding cost and conveyance of pipe. (Reference to specifications BIS No. 6530/72)
Detail cost for 30 meters

447524687.xlsx - data-Road
SWG -SP-1,2 &3 Pipes Page 1724 of 2191
a 150 mm dia - SWG
(a) Labour
Mason 1st class(labour-Irrigation.S.N.11) 0.900 day 564.00 1 day 507.60
2nd Class Mason (labour-Irrin-Semi Skilled. Sn.35) 2.100 day 540.00 1 day 1134.00
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled- 4.000 day 510.00 1 day 2040.00
S.N.4) 1.000 day 510.00 1 day 510.00
b) Material 4191.60
150 mm dia SW pipe 60cm long 50.000 each 0.00
Cement for 50 joints =0.045 cum 0.097 t 4.60 1t 0.45
Sand = 0.045 cum ( C-Mat-Sn.3- sand for Mortar)
Spun yarn = 0.09x50=4.50 (Table -31 -S.No.3) Pg- 0.068 cum 1493.00 1 cum 101.52
82 9.000 kgs 128.00 1 kgs 1152.00
(c) Total
(d) Add =fora+b
water charges @ 1% on Labour & 5445.57
Testing Charges 41.92
(e) Total = c+d 5487.49
(f) Overheads & Contractors Profit 14% 747.12
(g) Cost for 30 m (e+f) 6234.61
Rate per metre = g/30 207.82
Rate per 1 RM 207.85
Add VAT & Labour cess etc. @ 0% 0.00
Rate per 1 Rmt 207.85

b 200 mm dia - SWG


(a) Labour
Mason 1st class(labour-Irrigation.S.N.11) 1.050 day 564.00 1 day 592.20
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 2.450 day 540.00 1 day 1323.00
35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 4.500 day 510.00 1 day 2295.00
Woman mazdoor (Labour-Irrigation-Unskilled- 1.250 day 510.00 1 day 637.50
S.N.4)
b) Material 4847.70
200 mm dia SW pipe 60cm long 50.000 each 0.00
Cement for 50 joints =0.045 cum 0.130 t 4.60 1t 0.60
Sand = 0.045 cum 0.091 cum 1493.00 1 cum 135.86
Spun yarn = 0.09x50=4.50 (Table -36) Pg-372 12.000 kgs 128.00 1 kgs 1536.00
(c) Total = a+b 6520.16
(d) Add for water charges @ 1% on Labour & 48.48
Testing
(e) TotalCharges
= c+d 6568.64
(f) Overheads & Contractors Profit 14% 894.32
(g) Cost for 30 m (e+f) 7462.96
Rate per metre = g/30 248.77
Rate per 1 RM 248.80
Add VAT & Labour cess etc. @ 0% 0.00
Rate per 1 Rmt 248.80

c 230 mm dia - SWG


(a) Labour
Mason 1st class(labour-Irrigation.S.N.11) 1.200 day 564.00 1 day 676.80
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 2.800 day 540.00 1 day 1512.00
35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 5.000 day 510.00 1 day 2550.00
Woman mazdoor (Labour-Irrigation-Unskilled- 1.500 day 510.00 1 day 765.00
S.N.4)
b) Material 5503.80
230 mm dia SW pipe 60cm long 50.000 each 0.00
Cement for 50 joints =0.045 cum 0.146 t 4.60 1t 0.67
Sand = 0.045 cum 0.102 cum 1493.00 1 cum 152.29
Spun yarn = 0.09x50=4.50 13.500 kgs 128.00 1 kgs 1728.00
(c) Total = a+b 7384.76
(d) Add for water charges @ 1% on Labour & 55.04
Testing
(e) TotalCharges
= c+d 7439.80
(f) Overheads & Contractors Profit 14% 1012.93
(g) Cost for 30 m (e+f) 8452.73
Rate per metre = g/30 281.76
Rate per 1 RM 281.80
447524687.xlsx - data-Road
Add VAT & Labour cess etc. @ 0%
Page 1725 of 2191 0.00
Rate per 1 Rmt 281.80

d 250 mm dia - SWG


(a) Labour
Mason 1st class(labour-Irrigation.S.N.11) 1.350 day 564.00 1 day 761.40
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 3.150 day 540.00 1 day 1701.00
35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 5.500 day 510.00 1 day 2805.00
Woman mazdoor (Labour-Irrigation-Unskilled- 1.500 day 510.00 1 day 765.00
S.N.4)
b) Material 6032.40
250 mm dia SW pipe 60cm long 50.000 each 0.00
Cement for 50 joints =0.045 cum 0.162 t 4.60 1t 0.75
Sand = 0.045 cum 0.113 cum 1493.00 1 cum 168.71
Spun yarn = 0.09x50=4.50 (Table -36) Pg-372 15.000 kgs 128.00 1 kgs 1920.00
(c) Total = a+b 8121.86
(d) Add for water charges @ 1% on Labour & 60.32
Testing
(e) TotalCharges
= c+d 8182.18
(f) Overheads & Contractors Profit 14% 1114.00
(g) Cost for 30 m (e+f) 9296.18
Rate per metre = g/30 309.87
Rate per 1 RM 309.90
Add VAT & Labour cess etc. @ 0% 0.00
Rate per 1 Rmt 309.90

e 300 mm dia - SWG


(a) Labour
Mason 1st class(labour-Irrigation.S.N.11) 1.500 day 564.00 1 day 846.00
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 3.500 day 540.00 1 day 1890.00
35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 6.000 day 510.00 1 day 3060.00
Woman mazdoor (Labour-Irrigation-Unskilled- 1.500 day 510.00 1 day 765.00
S.N.4)
b) Material 6561.00
300 mm dia SW pipe 60cm long 50.000 each 0.00
Cement for 50 joints =0.045 cum 0.194 t 4.60 1t 0.89
Sand = 0.045 cum 0.136 cum 1493.00 1 cum 203.05
Spun yarn = 0.09x50=4.50 18.000 kgs 128.00 1 kgs 2304.00
(c) Total = a+b 9068.94
(d) Add for water charges @ 1% on Labour & 65.61
Testing Charges
(e) Total = c+d 9134.55
(f) Overheads & Contractors Profit 14% 1243.67
(g) Cost for 30 m (e+f) 10378.22
Rate per metre = g/30 345.94
Rate per 1 RM 345.95
Add VAT & Labour cess etc. @ 0% 0.00
Rate per 1 Rmt 345.95

f 350 mm dia - SWG


(a) Labour
Mason 1st class(labour-Irrigation.S.N.11) 1.650 day 564.00 1 day 930.60
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 3.850 day 540.00 1 day 2079.00
35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 7.000 day 510.00 1 day 3570.00
Woman mazdoor (Labour-Irrigation-Unskilled- 1.750 day 510.00 1 day 892.50
S.N.4)
b) Material 7472.10
350 mm dia SW pipe 60cm long 50.000 each 0.00 0.00
Cement for 50 joints =0.045 cum 0.225 t 4.60 1t 1.04
Sand = 0.045 cum 0.159 cum 1493.00 1 cum 237.39
Spun yarn = 0.09x50=4.50 21.000 kgs 128.00 1 kgs 2688.00
(c) Total = a+b 10398.53
(d) Add for water charges @ 1% on Labour & 74.72
Testing Charges
447524687.xlsx - data-Road
(e) Total = c+d Page 1726 of 2191 10473.25
(f) Overheads & Contractors Profit 14% 1425.93
(g) Cost for 30 m (e+f) 11899.18
Rate per metre = g/30 396.64
Rate per 1 RM 396.65
Add VAT & Labour cess etc. @ 0% 0.00
Rate per 1 Rmt 396.65

g 400 mm dia - SWG


(a) Labour
Mason 1st class(labour-Irrigation.S.N.11) 1.800 day 564.00 1 day 1015.20
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 4.200 day 540.00 1 day 2268.00
35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 8.000 day 510.00 1 day 4080.00
Woman mazdoor (Labour-Irrigation-Unskilled- 1.750 day 510.00 1 day 892.50
S.N.4)
b) Material 8255.70
400 mm dia SW pipe 60cm long 50.000 each 0.00 0.00
Cement for 50 joints =0.045 cum 0.256 t 4.60 1t 1.18
Sand = 0.045 cum 0.181 cum 1493.00 1 cum 270.23
Spun yarn = 0.09x50=4.50 24.000 kgs 128.00 1 kgs 3072.00
(c) Total = a+b 11599.11
(d) Add for water charges @ 1% on Labour & 82.56
Testing
(e) TotalCharges
= c+d 11681.67
(f) Overheads & Contractors Profit 14% 1590.46
(g) Cost for 30 m (e+f) 13272.13
Rate per metre = g/30 442.40
Rate per 1 RM 442.40
Add VAT & Labour cess etc. @ 0% 0.00
Rate per 1 Rmt 442.40

h 450 mm dia - SWG


(a) Labour
Mason 1st class(labour-Irrigation.S.N.11) 2.100 day 564.00 1 day 1184.40
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 4.900 day 540.00 1 day 2646.00
35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 10.000 day 510.00 1 day 5100.00
Woman mazdoor (Labour-Irrigation-Unskilled- 2.000 day 510.00 1 day 1020.00
S.N.4)
b) Material 9950.40
450 mm dia SW pipe 60cm long 50.000 each 0.00
Cement for 50 joints =0.045 cum 0.293 t 4.60 1t 1.35
Sand = 0.045 cum 0.204 cum 1493.00 1 cum 304.57
Spun yarn = 0.09x50=4.50 27.000 kgs 128.00 1 kgs 3456.00
(c) Total = a+b 13712.32
(d) Add for water charges @ 1% on Labour & 99.50
Testing
(e) TotalCharges
= c+d 13811.82
(f) Overheads & Contractors Profit 14% 1880.48
(g) Cost for 30 m (e+f) 15692.30
Rate per metre = g/30 523.08
Rate per 1 RM 523.10
Add VAT & Labour cess etc. @ 0% 0.00
Rate per 1 Rmt 523.10

16 Manufacture,supply and delivery of RCC Socket and Spigot Pipes confirming to B.I.S. 458/2003 ex-Factory, ( Rate
per Meter of effective length) including Transportation, Central Excice Duty, Sales Tax etc.complete.
a RCC NP3 S/S pipe - 300mm dia
P1 Basic Rate of RCC NP3 S/S pipe as per Table - 3 1 Rmt 1049.00 1 Rmt 1049.00
C1 of
SSRSSR
Rate of Cement / MT 1 MT 4600.00
C2 Market Rate of Cement / MT 1 MT 4600.00
Wc Cement required per 1 Rmt 14.40 Kg
R1 Variation in Cement Cost ( 4000-5600)/1000*3.6 0.00
S1 SSR Rate of MS rods / MT 1 MT 46000.00
S2 Market Rate of MS rods/ MT 1 MT 46000.00
447524687.xlsx - data-Road
Ws MS rods required per 1 Rmt 3.03 Kg
Page 1727 of 2191 0.00
R2 Variation in MS rods Cost ( 41000-
43000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 ) 1049.00
Total lead 10 Km
Rate up to 5 Kms Lead 46.00 46.00
Rate for every additional 1 KM lead or part thereof 1.45 7.25
Cost of pipe per 1 Rmt including transport 1102.25
Add over heads & CP on pipe 14% 150.07
Add CED @ 12.36% 0.00% 0.00
Add ST @ 5% 0.00% 0.00
Cost of pipe per 1 Rmt 1252.32
Add VAT & Labour cess etc. @ 0% 0.00
Cost of pipe per 1 Rmt 1252.32

b RCC NP3 S/S pipe - 350mm dia


P1 Basic Rate of RCC NP3 S/S pipe as per Table - 3 1 Rmt 1337.00 1 Rmt 1337.00
C1 of
SSRSSRRate of Cement / MT 1 MT 4600.00
C2 Market Rate of Cement / MT 1 MT 4600.00
Wc Cement required per 1 Rmt 36.00 Kg
R1 Variation in Cement Cost ( 4000-5600)/1000*3.6 0.00
S1 SSR Rate of MS rods / MT 1 MT 46000.00
S2 Market Rate of MS rods/ MT 1 MT 46000.00
Ws MS rods required per 1 Rmt 4.37 Kg 0.00
R2 Variation in MS rods Cost ( 41000-
43000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 ) 1337.00
Total lead 10 Km
Rate up to 5 Kms Lead 50.00 50.00
Rate for every additional 1 KM lead or part thereof 1.69 8.45
Cost of pipe per 1 Rmt including transport 1395.45
Add over heads & CP on pipe 13.62% 189.99
Add CED @ 12.36% 0.00% 0.00
Add ST @ 5% 0.00% 0.00
Cost of pipe per 1 Rmt 1585.44
Add VAT & Labour cess etc. @ 0% 0.00
Cost of pipe per 1 Rmt 1585.44

c RCC NP3 S/S pipe - 400mm dia


P1 Basic Rate of RCC NP3 S/S pipe as per Table - 3 1 Rmt 1482.00 1 Rmt 1482.00
C1 of
SSRSSRRate of Cement / MT 1 MT 4600.00
C2 Market Rate of Cement / MT 1 MT 4600.00
Wc Cement required per 1 Rmt 39.60 Kg
R1 Variation in Cement Cost ( 4000-5600)/1000*3.6 0.00
S1 SSR Rate of MS rods / MT 1 MT 46000.00
S2 Market Rate of MS rods/ MT 1 MT 46000.00
Ws MS rods required per 1 Rmt 4.79 Kg 0.00
R2 Variation in MS rods Cost ( 41000-
43000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 ) 1482.00
Total lead 10 Km
Rate up to 5 Kms Lead 62.00 62.00
Rate for every additional 1 KM lead or part thereof 3.15 15.75
Cost of pipe per 1 Rmt including transport 1559.75
Add over heads & CP on pipe 13.62% 212.36
Add CED @ 12.36% 0.00% 0.00
Add ST @ 5% 0.00% 0.00
Cost of pipe per 1 Rmt 1772.11
Add VAT & Labour cess etc. @ 0% 0.00
Cost of pipe per 1 Rmt 1772.11

d RCC NP3 S/S pipe - 450mm dia


447524687.xlsx - data-Road
P1 Basic Rate of RCC NP3 S/S pipe as per Table -Page 3 1728 of 21911 Rmt 1635.00 1 Rmt 1635.00
C1 of SSR
SSR Rate of Cement / MT 1 MT 4600.00
C2 Market Rate of Cement / MT 1 MT 4600.00
Wc Cement required per 1 Rmt 43.20 Kg
R1 Variation in Cement Cost ( 4000-5600)/1000*3.6 0.00
S1 SSR Rate of MS rods / MT 1 MT 46000.00
S2 Market Rate of MS rods/ MT 1 MT 46000.00
Ws MS rods required per 1 Rmt 5.33 Kg 0.00
R2 Variation in MS rods Cost ( 41000-
43000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 ) 1635.00
Total lead 10 Km
Rate up to 5 Kms Lead 68.00 68.00
Rate for every additional 1 KM lead or part thereof 3.15 15.75
Cost of pipe per 1 Rmt including transport 1718.75
Add over heads & CP on pipe 13.62% 234.01
Add CED @ 12.36% 0.00% 0.00
Add ST @ 5% 0.00% 0.00
Cost of pipe per 1 Rmt 1952.76
Add VAT & Labour cess etc. @ 0% 0.00
Cost of pipe per 1 Rmt 1952.76

e RCC NP3 S/S pipe - 500mm dia


P1 Basic Rate of RCC NP3 S/S pipe as per Table - 3 1 Rmt 1870.00 1 Rmt 1870.00
C1 of
SSRSSRRate of Cement / MT 1 MT 4600.00
C2 Market Rate of Cement / MT 1 MT 4600.00
Wc Cement required per 1 Rmt 50.40 Kg
R1 Variation in Cement Cost ( 4000-5600)/1000*3.6 0.00
S1 SSR Rate of MS rods / MT 1 MT 46000.00
S2 Market Rate of MS rods/ MT 1 MT 46000.00
Ws MS rods required per 1 Rmt 6.47 Kg 0.00
R2 Variation in MS rods Cost ( 41000-
43000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 ) 1870.00
Total lead 10 Km
Rate up to 5 Kms Lead 75.00 75.00
Rate for every additional 1 KM lead or part thereof 3.39 16.95
Cost of pipe per 1 Rmt including transport 1961.95
Add over heads & CP on pipe 13.62% 267.12
Add CED @ 12.36% 0.00% 0.00
Add ST @ 5% 0.00% 0.00
Cost of pipe per 1 Rmt 2229.07
Add VAT & Labour cess etc. @ 0% 0.00
Cost of pipe per 1 Rmt 2229.07

f RCC NP3 S/S pipe - 600mm dia


P1 Basic Rate of RCC NP3 S/S pipe as per Table - 3 1 Rmt 2623.00 1 Rmt 2623.00
C1 of
SSRSSRRate of Cement / MT 1 MT 4600.00
C2 Market Rate of Cement / MT 1 MT 4600.00
Wc Cement required per 1 Rmt 64.80 Kg
R1 Variation in Cement Cost ( 4000-5600)/1000*3.6 0.00
S1 SSR Rate of MS rods / MT 1 MT 46000.00
S2 Market Rate of MS rods/ MT 1 MT 46000.00
Ws MS rods required per 1 Rmt 9.19 Kg 0.00
R2 Variation in MS rods Cost ( 41000-
43000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 ) 2623.00
Total lead 10 Km
Rate up to 5 Kms Lead 101.00 101.00
Rate for every additional 1 KM lead or part thereof 4.84 24.20
Cost of pipe per 1 Rmt including transport 2748.20
Add over heads & CP on pipe 13.62% 374.17
447524687.xlsx - data-Road
Add CED @ 12.36% 0.00%
Page 1729 of 2191 0.00
Add ST @ 5% 0.00% 0.00
Cost of pipe per 1 Rmt 3122.37
Add VAT & Labour cess etc. @ 0% 0.00
Cost of pipe per 1 Rmt 3122.37

g RCC NP3 S/S pipe - 700mm dia


P1 Basic Rate of RCC NP3 S/S pipe as per Table - 3 1 Rmt 3348.00 1 Rmt 3348.00
C1 of
SSRSSRRate of Cement / MT 1 MT 4600.00
C2 Market Rate of Cement / MT 1 MT 4600.00
Wc Cement required per 1 Rmt 75.60 Kg
R1 Variation in Cement Cost ( 4000-5600)/1000*3.6 0.00
S1 SSR Rate of MS rods / MT 1 MT 46000.00
S2 Market Rate of MS rods/ MT 1 MT 46000.00
Ws MS rods required per 1 Rmt 13.61 Kg 0.00
R2 Variation in MS rods Cost ( 41000-
43000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 ) 3348.00
Total lead 10 Km
Rate up to 5 Kms Lead 136.00 136.00
Rate for every additional 1 KM lead or part thereof 9.56 47.80
Cost of pipe per 1 Rmt including transport 3531.80
Add over heads & CP on pipe 13.62% 480.85
Add CED @ 12.36% 0.00% 0.00
Add ST @ 5% 0.00% 0.00
Cost of pipe per 1 Rmt 4012.65
Add VAT & Labour cess etc. @ 0% 0.00
Cost of pipe per 1 Rmt 4012.65

h RCC NP3 S/S pipe - 800mm dia


P1 Basic Rate of RCC NP3 S/S pipe as per Table - 3 1 Rmt 4432.00 1 Rmt 4432.00
C1 of
SSRSSRRate of Cement / MT 1 MT 4600.00
C2 Market Rate of Cement / MT 1 MT 4600.00
Wc Cement required per 1 Rmt 97.20 Kg
R1 Variation in Cement Cost ( 4000-5600)/1000*3.6 0.00
S1 SSR Rate of MS rods / MT 1 MT 46000.00
S2 Market Rate of MS rods/ MT 1 MT 46000.00
Ws MS rods required per 1 Rmt 18.57 Kg 0.00
R2 Variation in MS rods Cost ( 41000-
43000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 ) 4432.00
Total lead 10 Km
Rate up to 5 Kms Lead 161.00 161.00
Rate for every additional 1 KM lead or part thereof 9.56 47.80
Cost of pipe per 1 Rmt including transport 4640.80
Add over heads & CP on pipe 13.62% 631.84
Add CED @ 12.36% 0.00% 0.00
Add ST @ 5% 0.00% 0.00
Cost of pipe per 1 Rmt 5272.64
Add VAT & Labour cess etc. @ 0% 0.00
Cost of pipe per 1 Rmt 5272.64

RCC NP4 S/S pipe -for Mains


i RCC NP4 S/S pipe - 400mm dia
P1 Basic Rate of RCC NP4 S/S pipe as per Table - 3 1 Rmt 1507.00 1 Rmt 1507.00
C1 of
SSRSSR
Rate of Cement / MT 1 MT 4600.00
C2 Market Rate of Cement / MT 1 MT 4600.00
Wc Cement required per 1 Rmt 39.60 Kg
R1 Variation in Cement Cost ( 4000-5600)/1000*3.6 0.00
S1 SSR Rate of MS rods / MT 1 MT 46000.00
S2 Market Rate of MS rods/ MT 1 MT 46000.00
Ws MS rods required per 1 Rmt 4.79 Kg 0.00
447524687.xlsx - data-Road
R2 Variation in MS rods Cost ( 41000-
Page 1730 of 2191
43000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 ) 1507.00
Total lead 10 Km
Rate up to 5 Kms Lead 62.00 62.00
Rate for every additional 1 KM lead or part thereof 3.15 15.75
Cost of pipe per 1 Rmt including transport 1584.75
Add over heads & CP on pipe 13.62% 215.76
Add CED @ 12.36% 0.00% 0.00
Add ST @ 5% 0.00% 0.00
Cost of pipe per 1 Rmt 1800.51
Add VAT & Labour cess etc. @ 0% 0.00
Cost of pipe per 1 Rmt 1800.51

j RCC NP4 S/S pipe - 450mm dia


P1 Basic Rate of RCC NP4 S/S pipe as per Table - 3 1 Rmt 1647.00 1 Rmt 1647.00
C1 of
SSRSSRRate of Cement / MT 1 MT 4600.00
C2 Market Rate of Cement / MT 1 MT 4600.00
Wc Cement required per 1 Rmt 43.20 Kg
R1 Variation in Cement Cost ( 4000-5600)/1000*3.6 0.00
S1 SSR Rate of MS rods / MT 1 MT 46000.00
S2 Market Rate of MS rods/ MT 1 MT 46000.00
Ws MS rods required per 1 Rmt 5.33 Kg 0.00
R2 Variation in MS rods Cost ( 41000-
43000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 ) 1647.00
Total lead 10 Km
Rate up to 5 Kms Lead 68.00 68.00
Rate for every additional 1 KM lead or part thereof 3.15 15.75
Cost of pipe per 1 Rmt including transport 1730.75
Add over heads & CP on pipe 13.62% 235.64
Add CED @ 12.36% 0.00% 0.00
Add ST @ 5% 0.00% 0.00
Cost of pipe per 1 Rmt 1966.39
Add VAT & Labour cess etc. @ 0% 0.00
Cost of pipe per 1 Rmt 1966.39

k RCC NP4 S/S pipe - 500mm dia


P1 Basic Rate of RCC NP4 S/S pipe as per Table - 3 1 Rmt 2032.00 1 Rmt 2032.00
C1 of
SSRSSRRate of Cement / MT 1 MT 4600.00
C2 Market Rate of Cement / MT 1 MT 4600.00
Wc Cement required per 1 Rmt 50.40 Kg
R1 Variation in Cement Cost ( 4000-5600)/1000*3.6 0.00
S1 SSR Rate of MS rods / MT 1 MT 46000.00
S2 Market Rate of MS rods/ MT 1 MT 46000.00
Ws MS rods required per 1 Rmt 6.47 Kg 0.00
R2 Variation in MS rods Cost ( 41000-
43000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 ) 2032.00
Total lead 10 Km
Rate up to 5 Kms Lead 75.00 75.00
Rate for every additional 1 KM lead or part thereof 3.39 16.95
Cost of pipe per 1 Rmt including transport 2123.95
Add over heads & CP on pipe 14% 297.35
Add CED @ 12.36% 12.36% 251.16
Add ST @ 5% 5.00% 101.60
Cost of pipe per 1 Rmt 2774.06
Add VAT & Labour cess etc. @ 0% 0.00
Cost of pipe per 1 Rmt 2774.06

l RCC NP4 S/S pipe - 600mm dia


P1 Basic Rate of RCC NP4 S/S pipe as per Table - 3 1 Rmt 2695.00 1 Rmt 2695.00
C1 of
SSRSSR
Rate of Cement / MT 1 MT 4600.00

447524687.xlsx - data-Road
C2 Market Rate of Cement / MT Page 1731 of 21911 MT 4600.00
Wc Cement required per 1 Rmt 64.80 Kg
R1 Variation in Cement Cost ( 4000-5600)/1000*3.6 0.00
S1 SSR Rate of MS rods / MT 1 MT 46000.00
S2 Market Rate of MS rods/ MT 1 MT 46000.00
Ws MS rods required per 1 Rmt 9.19 Kg 0.00
R2 Variation in MS rods Cost ( 41000-
43000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 ) 2695.00
Total lead 10 Km
Rate up to 5 Kms Lead 101.00 101.00
Rate for every additional 1 KM lead or part thereof 4.84 24.20
Cost of pipe per 1 Rmt including transport 2820.20
Add over heads & CP on pipe 14.00% 394.83
Add CED @ 12.36% 12.36% 333.10
Add ST @ 5% 5.00% 134.75
Cost of pipe per 1 Rmt 3682.88
Add VAT & Labour cess etc. @ 0% 0.00
Cost of pipe per 1 Rmt 3682.88

m RCC NP4 S/S pipe - 700mm dia


P1 Basic Rate of RCC NP4 S/S pipe as per Table - 3 1 Rmt 3505.00 1 Rmt 3505.00
C1 of
SSRSSRRate of Cement / MT 1 MT 4600.00
C2 Market Rate of Cement / MT 1 MT 4600.00
Wc Cement required per 1 Rmt 75.60 Kg
R1 Variation in Cement Cost ( 4000-5600)/1000*3.6 0.00
S1 SSR Rate of MS rods / MT 1 MT 46000.00
S2 Market Rate of MS rods/ MT 1 MT 46000.00
Ws MS rods required per 1 Rmt 13.61 Kg 0.00
R2 Variation in MS rods Cost ( 41000-
43000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 ) 3505.00
Total lead 10 Km
Rate up to 5 Kms Lead 136.00 136.00
Rate for every additional 1 KM lead or part thereof 9.56 47.80
Cost of pipe per 1 Rmt including transport 3688.80
Add over heads & CP on pipe 14.00% 516.43
Add CED @ 12.36% 12.36% 433.22
Add ST @ 5% 5.00% 175.25
Cost of pipe per 1 Rmt 4813.70
Add VAT & Labour cess etc. @ 0% 0.00
Cost of pipe per 1 Rmt 4813.70

n RCC NP4 S/S pipe - 800mm dia


P1 Basic Rate of RCC NP4 S/S pipe as per Table - 3 1 Rmt 4577.00 1 Rmt 4577.00
C1 of
SSRSSRRate of Cement / MT 1 MT 4600.00
C2 Market Rate of Cement / MT 1 MT 4600.00
Wc Cement required per 1 Rmt 97.20 Kg
R1 Variation in Cement Cost ( 4000-5600)/1000*3.6 0.00
S1 SSR Rate of MS rods / MT 1 MT 46000.00
S2 Market Rate of MS rods/ MT 1 MT 46000.00
Ws MS rods required per 1 Rmt 18.57 Kg 0.00
R2 Variation in MS rods Cost ( 41000-
43000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 ) 4577.00
Total lead 10 Km
Rate up to 5 Kms Lead 161.00 161.00
Rate for every additional 1 KM lead or part thereof 9.56 47.80
Cost of pipe per 1 Rmt including transport 4785.80
Add over heads & CP on pipe 14.00% 670.01
Add CED @ 12.36% 12.36% 565.72
Add ST @ 5% 5.00% 228.85
447524687.xlsx - data-Road
Cost of pipe per 1 Rmt Page 1732 of 2191 6250.38
Add VAT & Labour cess etc. @ 0% 0.00
Cost of pipe per 1 Rmt 6250.38

17 Manufacture,supply and delivery of Rubber rings to suit RCC Socket and Spigot Pipes confirming to B.I.S. 5382/
1985 (RATE PER EACH RUBBER RING) including Transportation,Central Excice Duty, Sales Tax but Excluding VAT
etc.complete.
A Dia of the Rubber Ring Basic CED @ ST @ Sub- OH& CP Total
Cost Total @
12.36% 5% 14%
RCC NP2 S/S pipe - 80mm dia 26.00 3.21 1.30 30.51 3.64 34.15
RCC NP2 S/S pipe - 100mm dia 32.00 3.96 1.60 37.56 4.48 42.04
RCC NP2 S/S pipe - 150mm dia 57.00 7.05 2.85 66.90 7.98 74.88
RCC NP2 S/S pipe - 200mm dia 67.00 8.28 3.35 78.63 9.38 88.01
RCC NP2 S/S pipe - 225mm dia 74.00 9.15 3.70 86.85 10.36 97.21
RCC NP2 S/S pipe - 250mm dia 83.00 10.26 4.15 97.41 11.62 109.03
RCC NP2 S/S pipe - 300mm dia 101.00 12.48 5.05 118.53 14.14 132.67
RCC NP2 S/S pipe - 350mm dia 117.00 14.46 5.85 137.31 16.38 153.69
RCC NP2 S/S pipe - 400mm dia 129.00 15.94 6.45 151.39 18.06 169.45
RCC NP2 S/S pipe - 450mm dia 146.00 18.05 7.30 171.35 20.44 191.79
RCC NP2 S/S pipe - 500mm dia 191.00 23.61 9.55 224.16 26.74 250.90
RCC NP2 S/S pipe - 600mm dia 251.00 31.02 12.55 294.57 35.14 329.71
RCC NP2 S/S pipe - 700mm dia 341.00 42.15 17.05 400.20 47.74 447.94
RCC NP2 S/S pipe - 800mm dia 433.00 53.52 21.65 508.17 60.62 568.79

B Dia of the Rubber Ring Basic Cost CED @ ST @ Sub- OH& CP Total
Total @
12.36% 5% 14%
RCC NP3 S/S pipe - 300mm dia 130.00 16.07 6.50 152.57 18.20 170.77
RCC NP3 S/S pipe - 350mm dia 155.00 19.16 7.75 181.91 21.70 203.61
RCC NP3 S/S pipe - 400mm dia 176.00 21.75 8.80 206.55 24.64 231.19
RCC NP3 S/S pipe - 450mm dia 200.00 24.72 10.00 234.72 28.00 262.72
RCC NP3 S/S pipe - 500mm dia 229.00 28.3 11.45 268.75 32.06 300.81
RCC NP3 S/S pipe - 600mm dia 333.00 41.16 16.65 390.81 46.62 437.43
RCC NP3 S/S pipe - 700mm dia 398.00 49.19 19.90 467.09 55.72 522.81
RCC NP3 S/S pipe - 800mm dia 483.00 59.7 24.15 566.85 67.62 634.47
RCC NP3 S/S pipe - 900mm dia 653.00 80.71 32.65 766.36 91.42 857.78
RCC NP3 S/S pipe - 1000mm dia 788.00 97.4 39.40 924.80 110.32 1035.12

Sub Analysis : (Basic Data)

*
OBSERVED DATA FOR TESTING OF 450 MM DIA PSC MAIN : Pumping main to Hydralic field test pressure
including transportation of Water with minimum lead of 500 M
(Length = 500 Mts) taking out put / 500 Mts. Unit = 1 Rmt.
Labour
Fitters (2 x 3 days) (including LC)
Fitters I Class ( Labour-Irrigation-Skilled-Sn.6) 3.000 day 648.00 1 day 1944.00
Fitters II Class ( Labour-Irrigation-semi Skilled-Sn.9) 3.000 day 540.00 1 day 1620.00
Machinery
Hire chargers for Hydralic field test pressure testing 3.000 days 1200.00 1 days 3600.00
including transportation of water @ Rs. 1200/-
(1000+200) / day
Material
Pressure guage 0.050 Nos 500.00 1 Nos 25.00
3/4" G.I. Pipe (20 mm) cost vide ( BMW-F.81 - 3.000 RM #REF! 1 RM #REF!
BMW-F.82 ) - sanitary SSR
Specials 1 Ls 500.00 1 Ls 500.00
Dummies 0.100 No. 1500.00 1 Each 150.00
Diesel (2 Lts. / Hr) 30 Hrs.(item No.4 of Pg.22) 60.000 Lts. #REF! 1 Lts. #REF!
(T) Total Rate per 500 Mts. #REF!
(r) Rate per 1 Rmt for 450 mm dia #REF!
(R) Rate per 1 Rmt for 10 mm dia = (10/450) x r #REF!

447524687.xlsx - data-Road
18 PHE-LRCS-6 : Lowering the RCC S/S pipes carefully Page 1733into the trenches laying them true to alignment and gradient,
of 2191
jointing with rubber rings and testing including filling with water with a water lead upto 500 meters including cost of
rubber rings as per BIS No. 783/1985 - RCC-NP2
Unit= 1 rmt
Taking out put 100 rmt
a Lowering - RCC S/S pipes - 80 mm dia -NP-2 80 mm dia
a) Labour
Mason 1st class(labour-Irrigation.S.N.11) 0.780 day 564.00 1 day 439.92
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 1.800 day 540.00 1 day 972.00
35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 5.000 day 510.00 1 day 2550.00
Woman mazdoor (Labour-Irrigation-Unskilled- 1.300 day 510.00 1 day 663.00
S.N.4) 4624.92
b) Material
Rubber rings conforming BIS 5382/1985-including 50.000 each 30.51 1 each 1525.50
CED & ST
c) Testing
Testing of Pipelines with required pressure as per 100.000 rm #REF! 1 rm #REF!
relevant IS Specification including filling with water
with a water lead upto 500 M, including hire
charges of testing equipment, labour and Materials
needed for testing (as per Sub Analysis 2 A)

(d) Total = a+b+c #REF!


(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 100 rmt (f+g) #REF!
Rate per rmt = h/100 #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!

b Lowering - RCC S/S pipes - 100 mm dia -NP-2 100 mm dia


a) Labour
Mason 1st class (labour-Irrigation.S.N.11) 0.960 day 564.00 1 day 541.44
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 2.240 day 540.00 1 day 1209.60
35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 6.300 day 510.00 1 day 3213.00
Woman mazdoor (Labour-Irrigation-Unskilled- 1.600 day 510.00 1 day 816.00
S.N.4) 5780.04
b) Material
Rubber rings conforming BIS 5382/1985-including 50.000 each 37.56 1 each 1878.00
CED & ST
c) Testing
Testing of Pipelines with required pressure (as per 100.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 100 rmt (f+g) #REF!
Rate per rmt = h/100 #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!

c Lowering - RCC S/S pipes - 150 mm dia -NP-2 150 mm dia


a) Labour
Mason 1st class (labour-Irrigation.S.N.11) 1.170 day 564.00 1 day 659.88
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 2.730 day 540.00 1 day 1474.20
35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 7.800 day 510.00 1 day 3978.00
Woman mazdoor (Labour-Irrigation-Unskilled- 1.600 day 510.00 1 day 816.00
S.N.4) 447524687.xlsx - data-Road
Page 1734 of 2191 6928.08
b) Material
Rubber rings conforming BIS 5382/1985-including 50.000 each 66.90 1 each 3345.00
CED & ST
c) Testing
Testing of Pipelines with required pressure (as per 100.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 100 rmt (f+g) #REF!
Rate per rmt = h/100 #REF!
VAT & Labour cess. 0% #REF!
- #REF! #REF!
Rate per 1 Rmt Rs #REF!

d Lowering - RCC S/S pipes - 200 mm dia -NP-2 200 mm dia


a) Labour
Mason 1st class (labour-Irrigation.S.N.11) 1.170 day 564.00 1 day 659.88
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 2.730 day 540.00 1 day 1474.20
35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 7.800 day 510.00 1 day 3978.00
Woman mazdoor (Labour-Irrigation-Unskilled- 1.600 day 510.00 1 day 816.00
S.N.4) 6928.08
b) Material
Rubber rings conforming BIS 5382/1985-including CED & 50.000 each 78.63 1 each 3931.50
ST
c) Testing
Testing of Pipelines with required pressure (as per 100.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 100 rmt (f+g) #REF!
Rate per rmt = h/100 #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!

e Lowering - RCC S/S pipes - 225 mm dia -NP-2 225 mm dia


a) Labour
Mason 1st class (labour-Irrigation.S.N.11) 1.620 day 564.00 1 day 913.68
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 3.780 day 540.00 1 day 2041.20
35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 10.500 day 510.00 1 day 5355.00
Woman mazdoor (Labour-Irrigation-Unskilled- 2.300 day 510.00 1 day 1173.00
S.N.4) 9482.88
b) Material
Rubber rings conforming BIS 5382/1985-including CED & 50.000 each 86.85 1 each 4342.50
ST
c) Testing
Testing of Pipelines with required pressure (as per 100.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 100 rmt (f+g) #REF!
Rate per rmt = h/100 #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!
447524687.xlsx - data-Road
Page 1735 of 2191
f Lowering - RCC S/S pipes - 250 mm dia -NP-2 250 mm dia
a) Labour
Mason 1st class (labour-Irrigation.S.N.11) 1.620 day 564.00 1 day 913.68
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 3.780 day 540.00 1 day 2041.20
35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 10.500 day 510.00 1 day 5355.00
Woman mazdoor (Labour-Irrigation-Unskilled- 2.300 day 510.00 1 day 1173.00
S.N.4) 9482.88
b) Material
Rubber rings conforming BIS 5382/1985-including CED & 50.000 each 97.41 1 each 4870.50
ST
c) Testing
Testing of Pipelines with required pressure (as per 100.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 100 rmt (f+g) #REF!
Rate per rmt = h/100 #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!

g Lowering - RCC S/S pipes - 300 mm dia -NP-2 300 mm dia


a) Labour
Mason 1st class (labour-Irrigation.S.N.11) 1.750 day 564.00 1 day 987.00
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 4.140 day 540.00 1 day 2235.60
35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 11.600 day 510.00 1 day 5916.00
Woman mazdoor (Labour-Irrigation-Unskilled- 2.300 day 510.00 1 day 1173.00
S.N.4) 10311.60
b) Material
Rubber rings conforming BIS 5382/1985-including CED & 40.000 each 118.53 1 each 4741.20
ST
c) Testing
Testing of Pipelines with required pressure (as per 100.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 100 rmt (f+g) #REF!
Rate per rmt = h/100 #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!
h Lowering - RCC S/S pipes - 350 mm dia -NP-2 350 mm dia
a) Labour
Mason 1st class (labour-Irrigation.S.N.11) 1.900 day 564.00 1 day 1071.60
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 4.500 day 540.00 1 day 2430.00
35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 12.700 day 510.00 1 day 6477.00
Woman mazdoor (Labour-Irrigation-Unskilled- 2.400 day 510.00 1 day 1224.00
S.N.4) 11202.60
b) Material
Rubber rings conforming BIS 5382/1985-including CED & 40.000 each 137.31 1 each 5492.40
ST
c) Testing
Testing of Pipelines with required pressure (as per 100.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & Testing #REF!
Charges
(f) Total = d+e #REF!
(g) Overheads & Contractors Profit 14% #REF!
447524687.xlsx - data-Road
(h) Cost for 100 rmt (f+g) Page 1736 of 2191 #REF!
Rate per rmt = h/100 #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!

i Lowering - RCC S/S pipes - 400 mm dia -NP-2 400 mm dia


a) Labour
Mason 1st class (labour-Irrigation.S.N.11) 2.100 day 564.00 1 day 1184.40
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 4.900 day 540.00 1 day 2646.00
35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 13.900 day 510.00 1 day 7089.00
Woman mazdoor (Labour-Irrigation-Unskilled- 2.900 day 510.00 1 day 1479.00
S.N.4) 12398.40
b) Material
Rubber rings conforming BIS 5382/1985-including CED & 40.000 each 151.39 1 each 6055.60
ST
c) Testing
Testing of Pipelines with required pressure (as per 100.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 100 rmt (f+g) #REF!
Rate per rmt = h/100 #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!

j Lowering - RCC S/S pipes - 450 mm dia -NP-2 450 mm dia


a) Labour
Mason 1st class (labour-Irrigation.S.N.11) 2.250 day 564.00 1 day 1269.00
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 5.250 day 540.00 1 day 2835.00
35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 15.000 day 510.00 1 day 7650.00
Woman mazdoor (Labour-Irrigation-Unskilled- 3.300 day 510.00 1 day 1683.00
S.N.4) 13437.00
b) Material
Rubber rings conforming BIS 5382/1985-including CED & 40.000 each 171.35 1 each 6854.00
ST
c) Testing
Testing of Pipelines with required pressure (as per 100.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 100 rmt (f+g) #REF!
Rate per rmt = h/100 #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!

k Lowering - RCC S/S pipes - 500 mm dia -NP-2 500 mm dia


a) Labour
Mason 1st class (labour-Irrigation.S.N.11) 2.430 day 564.00 1 day 1370.52
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 5.670 day 540.00 1 day 3061.80
35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 16.200 day 510.00 1 day 8262.00
Woman mazdoor (Labour-Irrigation-Unskilled- 3.300 day 510.00 1 day 1683.00
S.N.4) 14377.32
b) Material
Rubber rings conforming BIS 5382/1985-including CED & 40.000 each 224.16 1 each 8966.40
ST
c) Testing
Testing of Pipelines with required pressure (as per 100.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
447524687.xlsx - data-Road
(d) Total = a+b+c Page 1737 of 2191 #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 100 rmt (f+g) #REF!
Rate per rmt = h/100 #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!

l Lowering - RCC S/S pipes - 600 mm dia -NP-2 600 mm dia


a) Labour
Mason 1st class (labour-Irrigation.S.N.11) 2.750 day 564.00 1 day 1551.00
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 6.450 day 540.00 1 day 3483.00
35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 16.300 day 510.00 1 day 8313.00
Woman mazdoor (Labour-Irrigation-Unskilled- 3.300 day 510.00 1 day 1683.00
S.N.4) 15030.00
b) Material
Rubber rings conforming BIS 5382/1985-including CED & 40.000 each 294.57 1 each 11782.80
ST
c) Testing
Testing of Pipelines with required pressure (as per 100.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 100 rmt (f+g) #REF!
Rate per rmt = h/100 #REF!

m Lowering - RCC S/S pipes -700 mm dia -NP-2 700 mm dia


Basic rate as per PH SSR item No.11-B - Pg -3 1 No #REF! 1 No #REF!
Overheads & Contractors Profit 14% #REF!
Rate per each joint #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!

n Lowering - RCC S/S pipes -800 mm dia -NP-2 800 mm dia


Basic rate as per PH SSR item No.11-B - Pg -3 1 No #REF! 1 No #REF!
Overheads & Contractors Profit 14% #REF!
Rate per each joint #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!

o Lowering - RCC S/S pipes -900 mm dia -NP-2 900 mm dia


Basic rate as per PH SSR item No.11-B - Pg -3 1 No #REF! 1 No #REF!
Overheads & Contractors Profit 14% #REF!
Rate per each joint #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!

p Lowering - RCC S/S pipes -1000 mm dia -NP-2 1000 mm dia


Basic rate as per PH SSR item No.11-B - Pg -3 1 No #REF! 1 No #REF!
Overheads & Contractors Profit 14% #REF!
Rate per each joint #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!

19 PHE-LRCS-6 : Lowering the RCC S/S pipes carefully into the trenches laying them true to alignment and gradient,
jointing with rubber rings and testing including filling with water with a water lead upto 500 meters including cost of
rubber rings as per BIS No. 783/1985 - RCC-NP3

447524687.xlsx - data-Road
Unit= 1 rmt Page 1738 of 2191
Taking out put 100 rmt
a Lowering - RCC S/S pipes -300 mm dia - NP-3 300 mm dia

a) Labour
Mason 1st class (labour-Irrigation.S.N.11) 1.750 day 564.00 1 day 987.00
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 4.140 day 540.00 1 day 2235.60
35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 11.600 day 510.00 1 day 5916.00
Woman mazdoor (Labour-Irrigation-Unskilled- 2.300 day 510.00 1 day 1173.00
S.N.4) 10311.60
b) Material
Rubber rings conforming BIS 5382/1985-including CED & 40.000 each 152.57 1 each 6102.80
ST
c) Testing
Testing of Pipelines with required pressure as per 100.000 rm #REF! 1 rm #REF!
relevant IS Specification including filling with water
with a water lead upto 500 M, including hire
charges of testing equipment, labour and Materials
needed for testing (as per Sub Analysis 2 A)

(d) Total = a+b+c #REF!


(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 100 rmt (f+g) #REF!
Rate per rmt = h/100 #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!

b Lowering - RCC S/S pipes -350 mm dia - NP-3 350 mm dia

a) Labour
Mason 1st class (labour-Irrigation.S.N.11) 1.900 day 564.00 1 day 1071.60
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 4.500 day 540.00 1 day 2430.00
35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 12.700 day 510.00 1 day 6477.00
Woman mazdoor (Labour-Irrigation-Unskilled- 2.400 day 510.00 1 day 1224.00
S.N.4) 11202.60
b) Material
Rubber rings conforming BIS 5382/1985-including CED & 40.000 each 181.91 1 each 7276.40
ST
c) Testing
Testing of Pipelines (as per Sub Analysis 2 A) 100.000 rm #REF! 1 rm #REF!
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 100 rmt (f+g) #REF!
Rate per rmt = h/100 #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!

c Lowering - RCC S/S pipes -400 mm dia - NP-3 400 mm dia

a) Labour
Mason 1st class (labour-Irrigation.S.N.11) 2.100 day 564.00 1 day 1184.40
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 4.900 day 540.00 1 day 2646.00
35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 13.900 day 510.00 1 day 7089.00
Woman mazdoor (Labour-Irrigation-Unskilled- 2.900 day 510.00 1 day 1479.00
S.N.4) 12398.40
b) Material
447524687.xlsx - data-Road
Rubber rings conforming BIS 5382/1985-including CEDPage
& 1739 40.000
of 2191 each 206.55 1 each 8262.00
ST
c) Testing
Testing of Pipelines (as per Sub Analysis 2 A) 100.000 rm #REF! 1 rm #REF!
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 100 rmt (f+g) #REF!
Rate per rmt = h/100 #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!

d Lowering - RCC S/S pipes -450 mm dia - NP-3 450 mm dia

a) Labour
Mason 1st class (labour-Irrigation.S.N.11) 2.250 day 564.00 1 day 1269.00
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 5.250 day 540.00 1 day 2835.00
35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 15.000 day 510.00 1 day 7650.00
Woman mazdoor (Labour-Irrigation-Unskilled- 3.300 day 510.00 1 day 1683.00
S.N.4) 13437.00
b) Material
Rubber rings conforming BIS 5382/1985-including CED & 40.000 each 234.72 1 each 9388.80
ST
c) Testing
Testing of Pipelines with required pressure (as per 100.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 100 rmt (f+g) #REF!
Rate per rmt = h/100 #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!

e Lowering - RCC S/S pipes -500 mm dia - NP-3 500 mm dia

a) Labour
Mason 1st class (labour-Irrigation.S.N.11) 2.430 day 564.00 1 day 1370.52
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 5.670 day 540.00 1 day 3061.80
35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 16.200 day 510.00 1 day 8262.00
Woman mazdoor (Labour-Irrigation-Unskilled- 3.300 day 510.00 1 day 1683.00
S.N.4) 14377.32
b) Material
Rubber rings conforming BIS 5382/1985-including CED & 40.000 each 268.75 1 each 10750.00
ST
c) Testing
Testing of Pipelines with required pressure (as per 100.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 100 rmt (f+g) #REF!
Rate per rmt = h/100 #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!

f Lowering - RCC S/S pipes -600 mm dia - NP-3 600 mm dia

447524687.xlsx - data-Road
a) Labour Page 1740 of 2191
Mason 1st class (labour-Irrigation.S.N.11) 2.750 day 564.00 1 day 1551.00
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 6.450 day 540.00 1 day 3483.00
35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3) 16.300 day 510.00 1 day 8313.00
Woman mazdoor (Labour-Irrigation-Unskilled- 3.300 day 510.00 1 day 1683.00
S.N.4) 15030.00
b) Material
Rubber rings conforming BIS 5382/1985-including CED & 40.000 each 390.81 1 each 15632.40
ST
c) Testing
Testing of Pipelines with required pressure (as per 100.000 rm #REF! 1 rm #REF!
Sub Analysis 2 A)
(d) Total = a+b+c #REF!
(e) Add for water charges @ 1% on Labour & #REF!
Testing Charges
(f) Total = d+e #REF!
(g) Overheads & Contractors Profit 14% #REF!
(h) Cost for 100 rmt (f+g) #REF!
Rate per rmt = h/100 #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!

g Lowering - RCC S/S pipes -700 mm dia - NP-3 700 mm dia

Basic rate as per SSR item No.11-B - Pg - 297 1 No #REF! 1 No #REF!


including cost of rubber rings
Overheads & Contractors Profit 14% #REF!
Rate per each joint #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!

h Lowering - RCC S/S pipes -800 mm dia - NP-3 800 mm dia

Basic rate as per SSR item No.11-B - Pg - 297 - 1 No #REF! 1 No #REF!


including cost of rubber rings
Overheads & Contractors Profit 14% #REF!
Rate per each joint #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!

i Lowering - RCC S/S pipes -900 mm dia - NP-3 900 mm dia

Basic rate as per SSR item No.11-B - Pg - 297 - 1 No #REF! 1 No #REF!


including cost of rubber rings
Overheads & Contractors Profit 14% #REF!
Rate per each joint #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!

j Lowering - RCC S/S pipes -1000 mm dia - NP-3 1000 mm dia

Basic rate as per SSR item No.11-B - Pg - 297 - 1 No #REF! 1 No #REF!


including cost of rubber rings
Overheads & Contractors Profit 14% #REF!
Rate per each joint #REF!
VAT & Labour cess. 0% #REF!
Rate per 1 Rmt Rs #REF!
14 Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of man hole covers and frames anywhere in A.P., F.O.R.
destination including, loading, un-loading & stacking at site ,central excise duty,but excluding sales tax, octroi and
other Govt levies etc., as applicable.ISI mark
Table 29, Pg No.80 of the SSR (PH items)
a M.D. -10 with 500mm dia clear opening 1 No 1543.00 1 each 1543.00
447524687.xlsx - data-Road
Add CED @ 0.00%
Page 1741 of 2191 0.00
Add ST @ 0.00% 0.00
1543.00
Overheads & Contractors Profit on basic cost 13.615% 210.08
Rate per each 1753.10
Add VAT & Labour cess etc. @ 0% 0.00
Rate per each 1753.10

b H.D.-20 with 500mm dia clear opening 1 No 1989.00 1 each 1989.00


Add CED @ 0.00% 0.00
Add ST @ 0.00% 0.00
1989.00
Overheads & Contractors Profit on basic cost 13.615% 270.80
Rate per each 2259.80
Add VAT & Labour cess etc. @ 0% 0.00
Rate per each 2259.80

c H.D.-20 with 560mm dia clear opening 1 No 2133.00 1 each 2133.00


Add CED @ 0.00% 0.00
Add ST @ 0.00% 0.00
2133.00
Overheads & Contractors Profit on basic cost 13.615% 290.41
Rate per each 2423.45
Add VAT & Labour cess etc. @ 0% 0.00
Rate per each 2423.45

d H.D.-35 with 560mm dia clear opening. 1 No 2286.00 1 each 2286.00


Add CED @ 0.00% 0.00
Add ST @ 0.00% 0.00
2286.00
Overheads & Contractors Profit on basic cost 13.615% 311.24
Rate per each 2597.25
Add VAT & Labour cess etc. @ 0% 0.00
Rate per each 2597.25

15 Manufacture as per company’s standard specifications, supply and delivery of encapsulated plastic steps for man
holes anywhere in A.P. including cost of materials packing as per company’s standards, loading, transportation,
unloading and stacking at site of work etc, complete but excluding taxes such as sales tax, C.E.D and others etc., as
applicable.
Table 29, Pg No.82 of the SSR 1 No 166.00 1 each 166.00
Add CED @ 0.00% 0.00
Add ST @ 0.00% 0.00
Total Rs 166.00
Overheads & Contractors Profit on basic cost 13.615% 22.60
Rate per each 188.60
Add VAT & Labour cess etc. @ 0% 0.00
Rate per each 188.60

447524687.xlsx - data-Road
CONVEYANCE CHARGES OF MATERIALS AS PER SoR 2018-19 (COMMON TO ALL DEPARTMENTS).
LEAD, LIFT, LOADING AND UNLOADING CHARGES FOR MATERIALS FOR THE YEAR: 2018-19
( Pg. ….. to ….. of Bld.Items )

1. For total lead up to 150 m (including initial lead ) lead charges by head load only shall be adopted irrespective of
mode of conveyance.
2. For total lead exceeding 150 m conveyance by mechanical means only shall be adopted irrespective of mode of
conveyance.
3. The rates for loading at quarry including idle hire charges of trucks and hire charges
per for each kilometer and up to 5 km are cumulative and inclusive of total charges for
Preceding lead.
4. Unless otherwise specified lead charges for Earth / Sand / Gravel / Aggregates and Stones are for loose volume
and not for compacted or in-situ volume.
5. The rates for lift charges, lead charges, hire charges are cumulative and inclusive of rates for preceding lift, lead
and hire charges.
6. Lift charges are not payable where conveyance of materials is by mechanical means to final placing point.
7. Loading and unloading charges are not payable for conveyance by head load.
8. Loading charges are not payable for conveyance by mechanical means for disposal of
excavated materials beyond initial lead of 50 m wherever specified.
9. Loading and unloading charges are not payable for conveyance by mechanical means for disposal of excavated
materials beyond initial lead of 1 km wherever specified.
10. The rates for unloading of materials except earth, sand, gravel, coarse aggregate, rubble, size stone and cut
stone are inclusive of stacking.
11. Hire charges are per 1KM for tippers and trucks for transport of materials from work site to dump yard and other
places are cumulative& includes previous km up to 5 kms
12. For detailed calculations, refer to the Lead & Lift charges (Common to all Departments) chapter of Irrigation &
CAD works (Part-1), A.P. Revised Standard data. The lead & lift charges are inclusive of 13.615% Contractors profit
and Overhead charges.

A. (LEAD) CONVEYANCE CHARGES FOR MATERIALS BY HEAD LOAD FOR THE YEAR: 2016-17
COM-LDLFT-1

Earth / Sand /Gravel


Cement / PCC slab/
/ Murrum/ Lime/
Total distance Reinforce- ment Shahbad slab /
Surki/ Size stone /
Sl ( Total lead includes steel Str CC block/ BS
Cut stone Rubble /
No. initial lead ) steel Rs slab/ Late-rite /
Coarse aggregate
/ tonne Wood Rs / cum
Rs/Cum

Total lead up to 50 m
1 (covered by item rate) initial lead initial lead initial lead

Total lead up to 100 m


2 69.00 40.20 87.80
Total lead up to 150 m
3 138.00 80.50 175.60

Note 1. No loading or unloading charges are admissible for conveyance by head load.
s: 2. For total lead exceeding 150 m conveyance charges by mechanical means only shall be adopted irrespective of
mode of conveyance.
3.The lead & lift charges are inclusive of 13.615% Contractor Profit and Over Head charges
B. COM-LDLFT-2: ( LEAD) CONVEYANCE CHARGES FOR MACHINERY PER KILOMETER FOR TRANSPORTING MA
TIPPERS AND TRUCKS EXCLUDING LOADING, UNLOADING AND IDLE HIRE CHARGES OF MACHINERY FOR
2017-18
( No loading and unloading charges allowed for machinery loading and unloading )

(Lead) charges (Lead) charges (Lead) charges


(Lead) charges for for trucks and for trucks and for trucks and
trucks and tippers tippers for tippers for tippers per
for Earth / Sand Rubble/Size Cement/ Steel/ cu.meter for PCC
S.N Distance
/Gravel /Murrum/ stones/ Cut RCC poles/ AC slabs/ Shahabad
o.
Lime/ Surki/ per Stones/ Coarse & GI sheets/ slabs/ CC &
cu.meter aggregate per Packed Laterite
cu.meter materials/tonne blocks/Wood/
cum

Lead up to 1 km
1 34.20 33.00 20.60 48.60
Lead up to 2 km
2 47.90 46.20 28.90 68.00
Lead up to 3 km
3 63.90 63.90 39.90 94.00
Lead up to 4 km
4 77.60 77.60 48.50 114.10
Lead up to 5 km
5 91.30 91.30 57.10 134.30
for Every km beyond
6 5 km up to 30 km 13.70 13.70 8.60 20.10
for Every km beyond
7 30 km 11.40 11.40 7.10 16.80

Note: The lead & lift charges are inclusive of 13.615% Contractor Profit and Over Head charges
C. COM-LDLFT-3 : LOADING AND UNLOADING CHARGES BY MANUAL MEANS
( idle hire charges of trucks are not added

Rubble/ size
Earth / Sand
stone/ cut stone/
/Gravel Murrum/ / cement in steel in
Sl Description of item Coarse
Surki/ Rs/tonne Rs./tonne
No. aggregate, Lime
Rs / cum
in Rs/cum

Loading
1 22.90 45.80 75.50 90.50
Unloading
2 11.45 22.90 75.50 90.50
Note: The lead & lift charges are inclusive of 13.615% Contractor Profit and Over Head charges

D.COM-LDLFT-4 : LOADING AND UNLOADING CHARGES BY MANUAL MEANS (including idle hire charges of
trucks )

Rubble/ size
Earth / Sand /Gravel stone/ cut stone/
cement in steel in
S Description of item Murrum/ / Surki/ Coarse
Rs/tonne Rs./tonne
No. Rs / cum aggregate, Lime
in Rs/cum

Loading
1 123.00 145.90 185.60 200.60
Unloading
2 44.70 72.95 185.60 200.60
Note: The lead & lift charges are inclusive of 13.615% Contractor Profit and Over Head charges

E.COM-LDLFT- 5 : LOADING AND UNLOADING CHARGES BY MECHANICAL MEANS


(including idle hire charges of trucks
Rubble/ size
Earth / Sand /Gravel stone/ cut
S Description of item Murrum/ / Surki/ stone/ Coarse
No. Rs / cum aggregate, Lime
in Rs/cum

Loading
1 55.50 110.60
Unloading
2 17.30 17.30

Note: The lead & lift charges are inclusive of 13.615%


Contractor Profit and Over Head charges

F. COM-LDLFT- 5: LIFT CHARGES FOR MATERIALS BY HEAD LOAD

PCC
Earth / Sand /Gravel Cement
slab/Shahbad
Total lift Murrum/ Lime/ /Reinforce-
slab / CC block/
SNo ( Total lift includes Surki/ Size stone / ment steel Str
BS slab /
. initial lift ) Cut stone Rubble / steel
Laterite/ Wood
Coarse aggregate Rs / tonne
Rs / cum
Rs / cum

1 Total lift up to 3 m Initial lift Initial lift Initial lift


(covered by item rate)

2 For Every 1.00 Lift


beyond initial lift of 3 8.00 5.80 10.70
meters

Note: The lead & lift charges are inclusive of 13.615% Contractor Profit and Over Head charges
DEPARTMENTS).
YEAR: 2018-19

adopted irrespective of

irrespective of mode of

es are for loose volume

s for preceding lift, lead

nal placing point.

r disposal of excavated

e, size stone and cut

e to dump yard and other

chapter of Irrigation &


.615% Contractors profit

YEAR: 2016-17

adopted irrespective of

Head charges
FOR TRANSPORTING MATERIALS BY
S OF MACHINERY FOR THE YEAR:

and unloading )

(Lead)
charges for
(Lead)
trucks and
charges for
tippers per
trucks per
cu.meter
1000 nos. of
water/
bricks
1000 litres

20.50 55.10
28.70 77.10
38.30 102.80
46.40 124.80
54.60 146.80

8.20 22.00

6.80 18.40

ver Head charges


EANS

brick work
Rs/1000
No

62.90
62.90
rges

ng idle hire charges of

brick work
Rs/1000
No

244.60

244.60
rges

L MEANS

rges
KODADA MUNICIPALITY

Development of Parks in Miryalaguda Municipality, Under Amrut

GENERAL ABSTRACT

S.No Description of Items Quantity

1 Construction of Park behind Sai Techno School at APHB Colony 1 No

Sub-Total. A Rs.

2 Add VAT @ 5%

3 Add Labour Cess @ 1%

4 Provision towards QC @ 1%

5 Provision towards NAC @ 0.1%

6 Provision towards seiniorage charges


Provision towards Consultancy charges for Preparation of DPRs @
7
1.5%
8 L.S for Unforseen items

Sub-Total. B Rs.

Total Project Cost ( A+B ) Rs.

Say Rs.
r Amrut

Amount in Rs.

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
Page 1750 of 2191

Construction of Divider and central lighting


Construction of Park behind Sai Techno School at APHB Colony
DETAILED & ABSTRACT ESTIMATION
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
A Path ways
1 BLD-CSTN-2-1 (9): Earth work excavation and depositing on bank for all lifts
and with an initial lead of 10m including all operational, incidental, labour
charges such as shoring ,sheeting, planking, strutting, etc. complete for
finished item of work including seigniorage excluding dewatering charges etc
as per SS - 20 B (APSS 308). Data- Bld -
3
a For Walking Track/ Path ways
Length of path ways- ( A to E= 32.65m+E to F= 38.25m+F to N = 37.5+ N to
A = 37.85, D to G= 37.95m+B to K & C to K, P to o & P to R = 4x 10.2m, K
to J & P to Q = 2 x 7.75m, L to M & I to H=2x 10.30m and around
Fountain=24.20m
for sectioning and levelling the ground for Pathways 1 x 1 285.30 2.00 0.200 114.12
for kerbing walls on both sides of the path ways 1 x 2 285.30 0.30 0.150 25.68
Total Qty 139.80 Cum 210.92 1 Cum
2 RBR-TSRA-29 : Cast in Situ Cement Concrete M20 Kerb: Construction of
cement concrete kerb with top and bottom width 115 and 165 mm
respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150
mm thick, foundation having 50 mm projection beyond kerb stone, kerb
stone laid with kerb laying machine, foundation concrete laid manually, all
complete as per clause 408 MORTH data-
parks-22
for Kerbing of Pathways 1 x 2 285.30 570.60
570.60 Rmt 286.24 1 Rmt
3 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating
each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310) Data- Bld -
10
For levelling the track between walls 1 x 1 285.30 2.00 0.100 57.06
57.06 Cum 910.40 1 Cum

447524687.xlsx-Park-Sai Tech. School 1750


Page 1751 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
4 BLD-CSTN-3-6 ( 23 ) -Hand mixing up to Plinth Level : Plain Cement
concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse
aggregate ) using 40mm size Hard Granite Machine Crushed Metal including
cost and conveyance of all materials like cement, sand, coarse aggregate
water etc., to site , seigniorage charges on all materials, labour charges ,
for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface
to the required level curing etc., complete for finished item of work.for
foundation and under flooring bed. Data- Bld -
15
a For levelling the walking track between walls 1 x 1 285.30 2.00 0.100 57.06
Total Qty 57.06 Cum 3726.65 1 Cum
5 RBR-CCPV-13 - ii: Providing and Laying of Interlocking Concrete Block
Pavements using PHOENIX or equivalent high strength Cement Concrete
interlocking Regular Pavers of 50 mm thickness of M- 40 Grade of which top
12 mm thick shall be for colour pigmentation with imported colours and
white cement to get required reflective glazing inclusive of all taxes - as per
drawing and Technical Specification Clause 1504 MORD Data- Bld -
124
a For Walking Track/ Path ways 1 x 1 285.30 2.00 570.60
Total Qty 570.60 Sqm 570.70 1 Sqm
Sub- Total for Path ways -A
C Greenary & Play Area
6 RBR-HRTC-5: Making lawns including ploughing and breaking of clod,
removal of rubbish, dressing and supplying doobs grass roots and planting at
15 cm apart, including supplying and spreading of farm yard manure at rate
Data -Parks
of 0.18 cum per 100 sqm including maintaning for 1 year. -5
Area as per Drawing (4x 166.5) +(2x30) 1 x 1 722.00
722.00 Sqm 37.60 1 Sqm
7 RBR-HRTC-8: Planting ( Running metres 200 plants and 800 shrubs in two
rows in one km length of road where width of verge is 3m and above.)as per Data -Parks
Specification 307 MORTH -8
Area as per Drawing 1 x 4 51.00 204
204.00 Rmt 124.94 1 Rmt
8 RBR-HRTC-9: Planting of trees by the road side (Avenue trees) in 0.60 m dia
holes, 1 m deep dug in the ground, mixing the soil with decayed farm
yard/sludge manure, planting the saplings, backfilling the trench, watering,
Data -Parks
fixing the tree guard and maintaining the plants for one year -9
Ornamental trees along the compound wall in side the park 1 x 28 28.00 Nos 1550.80 1 Nos

447524687.xlsx-Park-Sai Tech. School 1751


Page 1752 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
9 RBR-HRTC-7: Planting permanent hedges including digging of trenches, 60
cm wide and 45 cm deep, refilling the excavated earth mixed with farmyard
manure, supplied at the rate of 4.65 cum per 100 metres and supplying and
planting hedge plants at 30 cm apart, and maintaining for 1 year Data -Parks
- 7 (a)
as per Drawing along the compound wall 1 x 1 167 167.00 Rmt 222.40 1 Rmt
10 Planting Speciman plants including digging of pits 60cm. Cubes, loosening of
15cm. Bottom red soil, filling with soil with 10 kg Compost + 100 DAP per pit
staking gap filling with in two month after planting.
Golden bamboo 8” 1 x 5 5 Nos 862.50 1 No
Fercaria 2” 1 x 5 5 Nos 1437.50 1 No
Ficus 4” (Verites). 1 x 5 5 Nos 575.00 1 No
Bottle Bush 1 x 5 5 Nos 690.00 1 No
Sub- Total for Greenary - B
C Children Play Area
11 BLD-CSTN-2-1 (9) : Earth work excavation for foundations and depositing on
bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308). Data- Bld -
3
for foundations of Slide and Ladder 1 x 3 0.60 0.60 0.75 0.81
for foundations of Swing Two seater 1 x 2 0.60 0.60 0.75 0.54
for foundations of Spiral Swing 1 x 1 0.75 0.75 0.75 0.42
for foundations of Sea-Saw 4 seater 1 x 1 0.75 0.75 0.75 0.42
for foundations of Merry go round 1 x 1 0.75 0.75 0.90 0.51
for Idle Park bench 6 x 4 0.45 0.45 0.45 2.19
for filling Sand 1 x 1 36.00 4.40 0.30 47.52
52.41 Cum 210.92 1 Cum
12 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating
each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310)

Filling sand - Children play area 1 x 1 36.0 4.40 0.30 47.52 Cum 910.40 1 Cum

447524687.xlsx-Park-Sai Tech. School 1752


Page 1753 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
13 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level :
Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate:
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of Data- Bld -
work.for foundation and under flooring bed. 15
for foundations of Slide and Ladder 1 x 3 0.60 0.60 0.75 0.81
for foundations of Swing Two seater 1 x 2 0.60 0.60 0.75 0.54
for foundations of Spiral Swing 1 x 1 0.75 0.75 0.75 0.42
for foundations of Sea-Saw 4 seater 1 x 1 0.75 0.75 0.75 0.42

447524687.xlsx-Park-Sai Tech. School 1753


Page 1754 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
for foundations of Merry go round 1 x 1 0.75 0.75 0.90 0.51
for Idle Park bench 6 x 4 0.45 0.45 0.45 2.19
4.89 Cum 3785.55 1 Cum
14 Providing Children play equipment of standard make including cost and
conveyance of all material and all labour charges, all operational and
incidental charges etc complete.
Slide and Ladder 8 feet 1 x 1 1 No 18083.00 1 No
Swing Two seater 1 x 1 1 No 15087.00 1 No
Spiral Swing 1 x 1 1 No 18618.00 1 No
Sea-Saw 4 seater 1 x 1 1 No 13482.00 1 No
Merry go round 1 x 2 2 No 17013.00 1 No
Providing seating area development by providing cast Iron /Cement seats
as directed by Engineer incharge etc, complete.
Idle Park bench 1 x 6 6 No 13418.00 1 No
Sub- Total for Children Play area - C
D Garden Posts with LED Lamps
15 ELEC-13.2.2 : Fabrication and Supply of M.S. Poles for garden posts with 'B' ele ssr-7-
class 6 mtrs long 60.25mm outer dia with base plate and suitable pole cap 10-1 d
including cost and conveyance of all material including fixing of luminaire and
labour charges etc., complete. 6Mtrs 'B' Class M.S. pipe of 60.25mm dia with
base plate and suitable pole cap
Along the Path ways as per requirement 1 x 13 13 Nos #REF! 1 each
16 Supply and fixing of 50mm dia 0.5 mtrs single arm M.S. pipe bracket with
sleeve and fasteners with necessary angle including painting etc., complete
on existing pole including fixing of luminaire.
1 x 13 13 Nos #REF! 1 each
17 13.4.6 : Erection charges for 6Mtrs. Long MS / GI Garden post including
excavation of pit, concreting 1:3:6 and painting including cost and
conveyance of all materials including fixing of luminaire and labour charges
etc., complete.
Along the Path ways as per requirement 1 x 13 13 Nos #REF! 1 each
18 Supply and fixing of 300mm x 180mm x 140mm No.16 gauge CRCA sheet
box with hinged door and locking arrangements and din channel for fixing
2Nos MCBs duly powder coated with matching colour of poles including
fixing with necessary arrangments etc., complete.
1 x 13 13 Nos #REF! 1 each

447524687.xlsx-Park-Sai Tech. School 1754


Page 1755 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
Supply and fixing of 6-32A 10KA DP MCB, C/D Curve ISI Mark of make
Legrand / Schneider.
1 x 13 13 Nos #REF! 1 each
19 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain
Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of Data- Bld -
work with nomonal reinforcement Pi r2 d 18
a for Coping of Lamp post above GL 1 x 13 3.14 0.04 0.45 0.73 Cum 5044.84 1 Cum
20 ELEC-3.11.1: Supply and transportation of ......... LED Street light Body ele ssr-3-9-
made of high grade pressure die – cast Aluminum alloy with corrosion 15
resistant powder coat, having protective toughened glass cover, Less Glare,
IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66)
protected, universal Voltage 100 - 270 V AC, P.F, ≥ 0.90, high power LED's
having efficacy ≥130 lumens/watt, and junction temperature < 75°C, with
Ingress protection IP66, Driver surge protection 4KV, with optics distribution
Type II medium, THD<10% at 110 Volts AC, driver efficiency ≥90%, CCT:
5600K, minimum CRI≥80, Inbuilt Electrical protections like Over voltage,
short circuit, Over load, Open Circuit, Miswiring, Intelligent pole mounting
option provides flexibility of vertical or horizontal pole mounting option
complete, with Top Openable Maintenance and Manufacture has to submit
LM79,LM80 & Photobiological Safety Report. Luminaire Performance
Complies to IS10322 (Part 5/Sec 3) & IEC 60598-1,IEC 60529 and ISO
certified company. LUMINAIRE MAKE : PHILIPS / OSRAM / GE /
CROMPTON / BAJAJ / SCHREDER / VIN / HALONIX / HAVELLS / HPL.
LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG /
LG LEDs.

Along the Path ways as per requirement 1 x 13 13.00 Nos #REF! 1 each
21 BLD-ELEC-3-1-4 : Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C.
insulated flexible copper cable in existing pipe for mains inlcuding all labour
charges etc., complete.
1 x 13 5.00 65.00 Rmt #REF! 1 Rmt

447524687.xlsx-Park-Sai Tech. School 1755


Page 1756 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
22 BLD-ELEC-3-1-2 : Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C.
insulated flexible copper cable in existing pipe for earth continuity including
all labour charges etc., complete.
1 x 13 5.00 65.00 Rmt #REF! 1 Rmt
23 ELEC-4.1.3 : Supply of 6 Sqmm 2 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part -
I) of Makes : Torrent / Universal / Unicab / Polycab / Havells / Gloster / KEI

Under ground Cable connecting all poles and extra for pole to panel 1 x 13 40.00 520.00 Rmt #REF! 1 Rmt
24 ELEC-4.1.5 : Supply of 10 Sqmm 4 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part -
I) of Makes : Torrent / Universal / Unicab / Polycab / Havells / Gloster / KEI.
from Panel to incomming 1 x 1 30.00 30.00 Rmt #REF! 1 Rmt
25 ELEC-15.6.1 : Earth work excavation of Trench in hard ground soil, laying of
U.G cables upto 50 Sq,mm on sand cushion covering the cable with bricks
and back filling of Trench duly providing route indicator embedded in C.C
including cost and conveyance of materials and labour charges etc.,
complete.
for under ground Cabling 1 x 13 30.00 390.00 Rmt #REF! 1 Rmt
26 Supply, Transportation, fabrication and erection of following guage CRCA
sheet steel enclosure for power control cubicle panel / boxes etc., including
cutting, bending drilling, welding and reveting etc., complete with cleaning
with 7 tank process and painting with powder coating including cost and
conveyance of all materials and labour charges.
1 No of 0.9m x 1.20m size Box 1 x 1 1.200 0.900 1.08 Sqm #REF! 1 Sqm
27 BLD-ELEC-4-1-3: Supply and erection of Panel mounting cubical type ( 100
to 250A ) TPN 415V, 50 Hz. switch disconnector fuse unit complete with front
drive mechanism with door inter lock, padlocking arrangement etc., complete
with fuse links on existing control panel.
1 x 1 1.00 Nos #REF! 1 each
28 BLD-ELEC-4-3-3: Supply and erection of Panel mounting 125A, 4 Pole,
25kA, MCCB with thermal magnetic setting / Microprocessor based release
arrangement with all connections etc., complete on existing panel.
1 x 1 1.00 Nos #REF! 1 each

447524687.xlsx-Park-Sai Tech. School 1756


Page 1757 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
29 ELEC-3.5.1: Supply of Automatic Street Light Control System with Optical
Sensor, Low volatage / High voltage trip and reset, operating voltage 150 -
280V AC, 50 HZ with suitable SMC enclousure of IP 54 protection, MCBs
and contactor suitable to control the load of 3 KW of single phase load with
necessary clamping arrangements. Makes : Swadeep Nature Switch / Light
Mate.
1 x 1 1.00 Nos #REF! 1 each
30 BLD-ELEC-5-1-1 : Providing independent earthling by excavating a trench to
a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm
dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume
pipe ring duly providing staggered holes including filling with equal
proportion of Salt and Charcoal in layers and all labour charges etc.,
complete for small quarters.

2 Nos for Poles + 2 Nos for Panels 1 x 4 4 Nos #REF! 1 Rmt


Sub- Total for Garden Post Electrification - D
Total of A+B+C+D
31 Water fall Type fountain: (FRP) location :to be located on the two supporting
stone masanry pillars for projected height of 20 feet & width 10 feet with MS
angle for load bearing and water turf (over head tank) to be fabricated in
stainless steel size 8 ft lenght x 3 ft width x 3 ft. height and duly connected
with flexible pipe/GI pipe from the bottom collection & commisioning etc,.
including all civil works etc,. complete.

Fountain 1 x 1 1 Nos 550000.00 1 Rmt


Total Rs.

447524687.xlsx-Park-Sai Tech. School 1757


Page 1758 of 2191

f Divider and central lighting


nd Sai Techno School at APHB Colony
& ABSTRACT ESTIMATION

Amount

29486.62

163329.00

51947.42

447524687.xlsx-Park-Sai Tech. School 1758


Page 1759 of 2191

Amount

212642.65

325641.42
783047.11

27147.20

25487.76

43422.40

447524687.xlsx-Park-Sai Tech. School 1759


Page 1760 of 2191

Amount

37140.80

4312.50
7187.50
2875.00
3450.00
151023.16

11054.32

43262.21

447524687.xlsx-Park-Sai Tech. School 1760


Page 1761 of 2191

Amount

447524687.xlsx-Park-Sai Tech. School 1761


Page 1762 of 2191

Amount

18511.34

18083.00
15087.00
18618.00
13482.00
34026.00

80508.00
252631.87

#REF!

#REF!

#REF!

#REF!

447524687.xlsx-Park-Sai Tech. School 1762


Page 1763 of 2191

Amount

#REF!

3683.00

#REF!

#REF!

447524687.xlsx-Park-Sai Tech. School 1763


Page 1764 of 2191

Amount

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

447524687.xlsx-Park-Sai Tech. School 1764


Page 1765 of 2191

Amount

#REF!

#REF!
#REF!
#REF!

550000.00
#REF!

447524687.xlsx-Park-Sai Tech. School 1765


Page 1766 of 2191

KODADA MUNICIPALITY
Construction of Toilets
ABSTRACT AND DETAILED ESTIMATE
S.N. Description of Item Nos L B D Quantity Rate Per
A EWE for footings : A1,B1,A2,B2 1 x 4 1.30 1.30 1.80 12.17
12.17 Cum
1 RBR-FNDN-1-A-i -manual means : Earthwork excavation for structures in all types of
soils up to 3.00 Mts depth below GL as per drawing and technical specifications
including setting out, construction of shoring and bracing, removal of stumps and
other deleterious material and disposal upto a lead of 50 m, dressing of sides and
bottom and backfilling in trenches with excavated suitable material as per Technical Bld up to 3F
Specification 305 MORD / 304 MORTH. for Sumps,Thrust blocks, Chambers and S.No 7
Man
in all Holes etc.
types of by manual
soils means,
for footings 80 % 9.74 Cum 221.47 1 Cum
2 BLD-CSTN-2-7 - (15) - Hard rock (blasting prohibited)-Upto 3 m depth
Earth work excavation and depositing on bank for all lifts and with an initial lead of
10m including all operational, incidental, labour charges such as shoring ,sheeting,
planking, strutting, etc. complete for finished item of work including seigniorage
excluding dewatering charges etc as per SS - 20 B (APSS 308). Bld up to 3F
S.No 6
in Hard rocky soils 20 % 2.43 Cum 1893.14 1 Cum
B Earth work excavation for fundation of Walls
Toilet - long walls 1 x 2 4.90 0.45 0.40 1.76
Toilet - short walls 1 x 3 3.02 0.45 0.40 1.63
Toilets - inner short walls 1 x 2 1.93 0.45 0.40 0.69
Toilets - inner Long walls 1 x 1 5.05 0.45 0.40 0.91
4.99 Cum
3 BLD-CSTN-2-1 (9): Earth work excavation for foundations and depositing on bank
for all lifts and with an initial lead of 10m including all operational, incidental, labour
charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item
of work including seigniorage excluding dewatering charges etc as per SS - 20 B
(APSS 308). Bld up to 3F
S.No 1
in all types of soils 80 % 3.99 Cum Err:509 1 Cum

Toilets- (3) -447524687.xlsx 1766


Page 1767 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


4 BLD-CSTN-2-7 - (15) - Hard rock (blasting prohibited)-Upto 3 m depth : Earth work
excavation and depositing on bank for all lifts and with an initial lead of 10m
including all operational, incidental, labour charges such as shoring ,sheeting,
planking, strutting, etc. complete for finished item of work including seigniorage
excluding dewatering charges etc as per SS - 20 B (APSS 308). Bld up to 3F
S.No 6
in Hard rocky soils 20 % 1.00 Cum 1893.14 1 Cum

Toilets- (3) -447524687.xlsx 1767


Page 1768 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


5 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level : Plain
Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse
aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost
and conveyance of all materials like cement, sand, coarse aggregate water etc., to
site , seigniorage charges on all materials, labour charges , for mixing , laying,
concrete , ramming in 15 cm layers, finishing top surface to the required level curing
etc., complete for finished item of work.for foundation and under flooring bed. Bld up to 3F
S.No 12
a For Footings
Footings : A1,B1,A2 & B2 1 x 4 1.30 1.30 0.15 1.01
Foundations
Toilet - long walls 1 x 2 4.90 0.45 0.10 0.44
Toilet - short walls 1 x 3 3.02 0.45 0.10 0.41
Toilets - inner short walls 1 x 2 1.93 0.45 0.10 0.17
Toilets - inner Long walls 1 x 1 5.05 0.45 0.10 0.23
2.26 Cum
b for Flooring Bed
Toilets Front area 1 x 2 2.51 0.88 0.075 0.33
Toilets Gents & Ladies 2 x 2 1.93 1.18 0.075 0.68
1.01 Cum
Total a + b 3.27 Cum 3785.55 1 Cum
6 BLD-CSTN-2-9 (17): Filling with useful available excavated earth (excluding rock) in
trenches, sides of foundations and basement with initial lead in layers not exceeding
15 cm thick, consolidating each deposited layer by watering and ramming including
cost and conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work. (APSS NO.
309 & 310) Bld up to 3F
S.No 10
for filling basement
Toilets Front area 1 x 1 2.51 0.88 0.225 0.50
Toilets Gents & Ladies 1 x 2 1.93 1.18 0.225 1.02
1.52 Cum 29.94 1 Cum

Toilets- (3) -447524687.xlsx 1768


Page 1769 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


7 BLD-CSTN-3-14-(31) - A : Supply and placing of the M-20 Design Mix Concrete
corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (sand)
coarse aggregate, water etc., to site and including Seigniorage charges, sales &
other taxes on all materials including all operational, incidental and labour charges
such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS
No. 402)with minimum cement content as per IS code fo FOUNDATIONS, PLINTH,
PEDESTALS Bld up to 3F
S.No 19
a for Footings
Footings : A1,B1,A2 & B2 1 x 4 1.10 1.10 0.30 1.45
Total 1.45 Cum 7923.65 1 Cum
b for Pedastals
1 x 4 0.40 0.40 0.60 0.38
0.38 Cum 9665.14 1 Cum
c Plinth Beams
Toilet - long walls 1 x 2 4.90 0.23 0.30 0.68
Toilet - short walls 1 x 3 3.02 0.23 0.30 0.63
1.31 Cum 11576.60 1 Cum
8 BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-20 Design Mix Concrete
corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (sand)
coarse aggregate, water etc., to site and including Seigniorage charges, sales &
other taxes on all materials including all operational, incidental and labour charges
such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS
No. 402)with minimum cement content as per IS code for COLUMNS, LINTELS,
WATER TANKS, RCC WALLS IN BUILDINGS Bld up to 3F
S.No 20
a C1 Coloumns Up to Ground level 1 x 4 0.23 0.30 0.75 0.21
C1 Columns above GL and up to roof level 1 x 4 0.23 0.30 3.30 0.91
1.12 Cum 11959.00 1 Cum
b Lintels

Toilets- (3) -447524687.xlsx 1769


Page 1770 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


over D1 Doors 1 x 2 1.20 0.23 0.20 0.11
over D2 Doors 1 x 4 1.05 0.23 0.20 0.19
ventilators 1 x 4 0.90 0.23 0.20 0.17
0.47 Cum 12006.04 1 Cum

Toilets- (3) -447524687.xlsx 1770


Page 1771 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


9 BLD-CSTN-3-16-(31)-C: Supply and placing of the M-20 Design Mix Concrete
corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (sand)
coarse aggregate, water etc., to site and including Seigniorage charges, sales &
other taxes on all materials including all operational, incidental and labour charges
such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS
No. 402)with minimum cement content as per IS code from standard suppliers
approved by the department including pumping, centering, shuttering, laying
concrete, vibrating, curing etc. complete but excluding cost of steel and its
fabrication charges for finished item of work. for RCC SLABS, BEAMS
Bld up to 3F
S.No 21-B
a 115mm thick roof slab GF
Toilets 1 x 1 5.50 3.48 0.115 2.20
or Say 2.20 Cum 5969.75 1 Cum
b Roof Beams
Toilet - long walls 1 x 2 4.90 0.23 0.30 0.68
Toilet - short walls 1 x 2 3.02 0.23 0.30 0.42
1.10 Cum 10500.72 1 Cum
10 BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop
using hard granite stone including cost & Conveyance of all materials like Cement,
Sand , Water, Granite Stones, including Seigniorage Charges on all Materials,
,labour charges for cutting Stones to required size and shape, mixing of Cement
Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of
Work . Bld up to 3F
S.No 28
Below Ground Level
Toilet - long walls 1 x 2 4.90 0.45 0.30 1.32
Toilet - short walls 1 x 3 3.02 0.45 0.30 1.22
Toilets - inner short walls 1 x 2 1.93 0.45 0.30 0.52
Toilets - inner Long walls 1 x 1 5.05 0.45 0.30 0.68
3.74 Cum #REF! 1 Cum

Toilets- (3) -447524687.xlsx 1771


Page 1772 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


11 BLD-CSTN-6-6-(61) : Construction of CRS Masonary 2nd Sort in Cement Mortor
( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials
like Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all
Materials, ,labour charges for cutting Stones to required size and shape, mixing of
Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished
Above GL for. for
item of Work Base ment
Base ment.
Partion wall 1 x 1 3.02 0.30 0.30 0.27
Toilets - inner short walls 1 x 2 1.93 0.30 0.30 0.35
Toilets - inner Long walls 1 x 1 5.05 0.30 0.30 0.45
or Say 1.07 Cum 4074.46 1 Cum
12 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level: Plain Cement
concrete nominal mix m-20 (Cement : fine aggregate: coarse aggregate ) using
12mm size Hard Granite Machine Crushed Graded Metal including cost and
conveyance of all materials like cement, sand, coarse aggregate water etc., to site ,
seigniorage charges on all materials, labour charges , for mixing , laying, concrete ,
ramming in 15 cm layers, finishing top surface to the required level curing etc.,
complete for finished item of work with nomonal reinforcement Bld up to 3F
S.No 18
Bed blocks for fixing of Doors 6 x 6 0.20 0.23 0.10 0.17
0.17 Cum #REF! 1 Cum
13 BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size
23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all
Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges
on all materials, including all labour charges like mixing Cement Mortor, scaffoding
charges lift charges , curing charges etc., complete for finished item of work Bld up to 3F
S.No 31
Toilet - long walls 1 x 2 4.90 0.23 2.83 6.37
Toilet - short walls 1 x 3 3.02 0.23 2.83 5.89
Deductions
over D1 Doors -1 x 2 0.90 0.23 1.98 -0.82
ventilators -1 x 4 0.60 0.23 0.45 -0.25
11.19 Cum #REF! 1 Cum
14 BLD-CSTN-5-11 (49) : 11.5 cm wide Brick masonry for super-structure on ground
floor in cm (1:3) using second class traditional size bricks including cost of all
materials, seigniorage charges, labour and all operations for constructing half brick
masonry, mixing cement mortar, curing etc., complete for finished item of work, but Bld up to 3F
excluding conveyance charges of materials. S.No 33

Toilets- (3) -447524687.xlsx 1772


Page 1773 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


Partion wall 1 x 1 3.02 3.19 9.62
Toilets - inner short walls 1 x 2 1.93 3.19 12.29
Toilets - inner Long walls 1 x 1 5.05 3.19 16.08
Deduction for openings
over D2 Doors -1 x 4 0.75 1.98 -5.94
32.05 sqm 6962.33 10 sqm
15 BLD-CSTN-8-7-(82) : Plastering with 20mm thick in single coat in CM (1:4) finished
smooth including cost and conveyance of all materials to site, seigniorage charges
on all materials, finishing, curing, scaffolding and all operational, incidental, labour
charges etc., including cutting grooves where ever necessary etc., complete for Bld up to 3F
finished item of work. (As per SS 903). per 10 Sqm. S.No 36
Outer walls
Toilet - long walls 1 x 2 3.36 3.30 22.18
Toilet - short walls 1 x 2 2.78 3.30 18.35
or Say 40.53 Sqm 2322.92 10 Sqm
16 BLD-CSTN-8-2-(77): Plastering with 12mm thick in single coat in CM (1:4) finished
smooth including cost and conveyance of all materials to site, seigniorage charges
on all materials, finishing, curing, scaffolding and all operational, incidental, labour
charges etc., including cutting grooves where ever necessary etc., complete for
Bld up to 3F
finished item of work. (As per SS 903).
S.No 34
Inner walls
Toilets Front area 1 x 2 2.51 0.880 2.88 19.49
Toilets Gents & Ladies 2 x 2 1.93 1.180 2.88 35.77
Deduction for openings
Doors D1 -1 x 2 0.90 1.98 -3.56
Doors D2 -1 x 4 0.75 1.98 -5.94
ventilators -1 x 4 0.60 0.45 -1.08
44.68 Sqm 1507.50 10 Sqm
17 BLD-CSTN-8-1-(76):Plastering with 12mm thick in single coat in CM (1:3) finished
smooth including cost and conveyance of all materials to site, seigniorage charges
on all materials, finishing, curing, scaffolding and all operational, incidental, labour
charges etc., including cutting grooves where ever necessary etc., complete for
finished item of work. (As per SS 903). per 10 Sqm.Ceiling Bld up to 3F
S.No 33

Toilets- (3) -447524687.xlsx 1773


Page 1774 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


Toilets Front area 1 x 2 2.51 0.88 4.42
Toilets Gents & Ladies 2 x 2 1.93 1.18 9.11
Add for exposed faces of beams etc. 0.27
13.80 Sqm 1601.57 10 Sqm

Toilets- (3) -447524687.xlsx 1774


Page 1775 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


18 BLD-CSTN-11-4- (161): White washing Two coat with whiting of approved quality to
give an even shade after thoroughly brushing the surface to remove all dirt and
remains of loose powdered materials including cost of all materials, labour charges
and incidental such as scaffolding, lift charges etc., complete for finished item of
work. Bld up to 3F
S.No 56
Qty as per ceiling & inne rplastering 58.48 Sqm 250.11 10 Sqm
19 BLD-CSTN-11-8-(164): Colour washing two coats with approved Colour and quality
to give an even shade after thoroughly brushing the surface to remove all dirt and
remains of loose powdered materials including cost of all materials, labour charges
and incidental such as scaffolding, lift charges etc., complete for finished item of
work, but excluding conveyance charges of materials Bld up to 3F
S.No 57
Qty as per external wall plastering 40.53
40.53 Sqm 584.62 10 Sqm
20 BLD-CSTN-10-25-(148):Providing impervious coat to exposed RCC roof slab
surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of
cement laid over roof when it is green including cost of all materials, seigniorage
charges, excluding conveyance charges of materials and including all operational,
incidental and labour charges for mixing mortar, laying, rendering smooth and thread
lining, curing, rounding off junctions of wall and slab etc,, complete for finished item
of work Bld up to 3F
S.No 51
Qty as per Slab area 58.48 Sqm 4616.35 10 Sqm
21 BLD-CSTN-4-1-(34): Providing High Yield Strength Deformed (HYSD)/ Thermo
Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as
per IS 1786-1979) of different diameters for RCC works , including labour charges
for straightening, cutting, bending to required sizes and shapes, placing in position
with cover blocks of approved materials and size and tying and lap-splicing with
binding wire of 18 SWG, forming grills for reinforcement work as per approved
designs and drawings, including cost and conveyance of steel bars, including all
wastages such as overlaps, couplings, chairs, spacer bars including cost and
conveyance of binding wire, cover blocks and all incidental, operational, labour
charges such as cutting, bending, placing in position, tying including sales and other
taxes on all materials etc., complete for finished item of work in all floors.( APSS
No.126 Bld up to 3F
S.No 22
Footings and pedastals 1.83 25.00 Kg/Cum 45.75
Columns 1.12 110.00 Kg/Cum 123.20
Plinth Beams 1.31 70.00 Kg/Cum 91.70

Toilets- (3) -447524687.xlsx 1775


Page 1776 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


Roof Beams 1.10 100.00 Kg/Cum 110.00
Lintels 0.47 40.00 Kg/Cum 18.80
120mm Thick Slabs 2.20 80.00 Kg/Cum 176.00
Total 565.45 Kgs
Or Say 0.57 MTs 50924.00 1 MTs

Toilets- (3) -447524687.xlsx 1776


Page 1777 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


22 TBSC-L.I-11: Providing and fixing door frames fabricated from sections made of
galvanized steel powder coated (base steel as per IS 513, galvanised as per IS 277
with zinc of 120 grams / square metre), the factory made section are powder coated
with pure polyester powder of 50-60 microns thick with total coated thickness of 1.25
mm, size of door frame section is of 105 x 60 mm with a rebate of 38 mm to
accommodate 35 mm thick door shutter, with groove to insert gasket in the frame
section, frame section filled with polyurethane foam, cut to length, and joined by way
of welding, each frame provided with: a) 2mm thick MS powder coated butt hinges of
100 mm long – 3 Nos. for single shutter, 6 Nos. for double shutter. b) CRCA
electroplates stiffeners of 6 Nos. – 3 in each vertical. c) 40 mm x 200 mm x 1.2 mm
hold fasts screwed to stiffeners – 6 Nos. with split end tail. d) Nylon Aldrop Receiver
– 1 No. for single shutter frame. e)Tie Rod – 1 No
Bld - data-
S.No 111
Doors D1 1 x 2 4.860 9.72
9.72 Rmt 781.67 1 Rmt
23 Supply and fixing of 25 mm thick Flush Door shutter solid bond wood block board
type with commercial ply on both faces with 1no. 300 mm long Aldrop, 2 nos. 125
mm lond door handle, 1 no. 150 mm long tower bolt, 1 no. 250 mm long door latch
1 No. door stopper ( all fixturs MS Powder coated ) including c/c of all materials and
labour chrges etc., complete Bld - data-
S.No 112
Doors D1 1 x 2 0.900 1.980 3.56
3.56 Sqm 1579.20 1 Sqm
24 TBSC-L.III-03: Providing and fixing 30mm thick FACTORY MADE SOLID SINGLE
SIDE PRELAM PANEL PVC DOOR SHUTTER consisting of frame made out of MS.
Tubes of 19gauge thickness and size of 19mmX19mm for stiles, and 15mmX15mm
for top and bottom rails. The MS. Frame shall have a coat of steel primers of
approved make and anufacture. MS. Frame covered with 5mm thick heat molded
single side Prelam Pac ‘C’ channel of size 30mmX50mm to form stiles.5mm thick&
75mm wide single side prelim Pac sheets shall be for the top, bottom and lock rails.
Paneling of 5mm thick one side Pac sheet to be fitted in the MS. Frame and sealed
to the front (prelam side) stiles and rails (which should have a 5mm 45 bent portion
as beading) and attached to the back(white/ivory) stiles and rails which should have
a 10mm 900 bent portion as beading ) using 2nos. 15mm wide X 5mm thick Pac
sheet beading inside the 90 bent beading. All stiles, rails and beadings are to be
joined to the panel using solvent cement etc. an additional 5mm thick Pac strip of
20mm width to be stuck on the interior side of the ‘C” channel using Pac solvent
cement adhesive and 10mm(5mmX2) thick, 20mm wide cross Pac sheet to be fitted
as gap insert for top and bottom rail etc. complete as per direction of Engineer –in-
Charge, manufacture specification and drawing.

Toilets- (3) -447524687.xlsx 1777


Page 1778 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


Door D2 1 x 4 0.750 1.980 5.94 Sqm 2524.53 1 Sqm
25 BLD-CSTN-9-6-(104) : Flooring with ceramic tiles (Non skid type), set over base
coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab,
including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm &
jointed neatly with white cement paste to full depth mixed with pigment of matching
shade, including cost of all materials like cement, sand water and tiles etc.,
complete, for finished item of work, but excluding the cost of conveyance of all
materials. (For Toilets)

. Toilets Front area 1 x 2 2.51 0.88 4.42


Toilets Gents & Ladies 2 x 2 1.93 1.18 9.11
add for steps etc 0.14
13.67 Sqm 8089.46 10 Sqm
26 Supplying and fixing of 7.5mm thick Aluminium Grill (as approved by the
department) 3.58 Kg/Sqm.including cost and conveyance of all material and all
labour charges etc, complete.
ventilators 1 x 4 0.60 0.45 1.08
1.08 sqm 1146.38 1 sqm

Toilets- (3) -447524687.xlsx 1778


Page 1779 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


26 BLD-CSTN-9-18-(116) : Dadooing to walls with Glazed colour tiles of any size 1st
quality set over a base coat of CM(1:3) Prop. 12mm thick and neat Gray cement
slurry of Honey like consistancy sread at the rate of 3.30 Kg of cement per One
Square Meter and jointed wiyh neat White cement paste mixed with pigmant of
matching shade including cost and conveyance of all materials like cement, sand,
water, flooring Tiles etc. to site, all operational, incidental and labour charges such
as mixing of cement mortar, laying, jointing, curing, lift charges etc., complete for
finished item of work (for toilets)

Toilets Front area 2 x 2 2.51 0.88 1.200 16.27


Toilets Gents & Ladies 2 x 4 1.93 1.18 1.200 29.86
Deductions
Doors D1 -1 x 2 0.90 1.980 -3.56
Doors D2 -1 x 4 0.75 1.980 -5.94
36.62 sqm 5464.68 10 sqm
Total of - A
Add for Sanitary and WS works @ 7.5%
Add for Electrification @ 5%

Total Rs.
Total Cost Say Rs.

Toilets- (3) -447524687.xlsx 1779


Page 1780 of 2191

A MUNICIPALITY
uction of Toilets
D DETAILED ESTIMATE
Amount

2157.00

4600.00

Err:509

Toilets- (3) -447524687.xlsx 1780


Page 1781 of 2191

Amount

1893.00

Toilets- (3) -447524687.xlsx 1781


Page 1782 of 2191

Amount

12379.00

46.00

Toilets- (3) -447524687.xlsx 1782


Page 1783 of 2191

Amount

11489.00

3673.00

15165.00

13394.00

Toilets- (3) -447524687.xlsx 1783


Page 1784 of 2191

Amount

5643.00

Toilets- (3) -447524687.xlsx 1784


Page 1785 of 2191

Amount

13133.00

11551.00

#REF!

Toilets- (3) -447524687.xlsx 1785


Page 1786 of 2191

Amount

4360.00

#REF!

#REF!

Toilets- (3) -447524687.xlsx 1786


Page 1787 of 2191

Amount

22314.00

9415.00

6736.00

Toilets- (3) -447524687.xlsx 1787


Page 1788 of 2191

Amount

2210.00

Toilets- (3) -447524687.xlsx 1788


Page 1789 of 2191

Amount

1463.00

2369.00

26996.00

Toilets- (3) -447524687.xlsx 1789


Page 1790 of 2191

Amount

29027.00

Toilets- (3) -447524687.xlsx 1790


Page 1791 of 2191

Amount

7598.00

5622.00

Toilets- (3) -447524687.xlsx 1791


Page 1792 of 2191

Amount
14996.00

11058.00

1238.00

Toilets- (3) -447524687.xlsx 1792


Page 1793 of 2191

Amount

20014.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

Toilets- (3) -447524687.xlsx 1793


KODADA MUNICIPALITY

Development of Parks in Miryalaguda Municipality, Under Amrut

GENERAL ABSTRACT

S.No Description of Items Quantity

1 Construction of Park near Katalguda 1 No

Sub-Total. A Rs.

2 Add VAT @ 5%

3 Add Labour Cess @ 1%

4 Provision towards QC @ 1%

5 Provision towards seiniorage charges


Provision towards Consultancy charges for Preparation of DPRs @
6
1.5%
7 L.S for Unforseen items

Sub-Total. B Rs.

Total Project Cost ( A+B ) Rs.

Say Rs.
r Amrut

Amount in Rs.

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
KODADA MUNICIPALITY

Development of Parks in Miryalaguda Municipality, Under Amrut

GENERAL ABSTRACT

S.No Description of Items Quantity

1 Construction of Park near BC Hostel at APHB Colony 1 No

Sub-Total. A Rs.

2 Add VAT @ 5%

3 Add Labour Cess @ 1%

4 Provision towards QC @ 1%

5 Provision towards NAC @ 0.1%

6 Provision towards seiniorage charges


Provision towards Consultancy charges for Preparation of DPRs @
7
1.5%
8 L.S for Unforseen items

Sub-Total. B Rs.

Total Project Cost ( A+B ) Rs.

Say Rs.
r Amrut

Amount in Rs.

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
Page 1798 of 2191

Construction of Divider and central lighting


Construction of Park near BC Hostel at APHB Colony
DETAILED & ABSTRACT ESTIMATION
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
A Compound Wall
Compound Wall Front side 1 x 1 41.50
Total length of the Compound Wall 41.50 0.60 0.60 14.94
for gate Pillars 1 x 2 1.40 1.40 1.50 5.88
Deduction for gate pillars -1 x 2 1.40 0.60 0.60 -1.01
19.81 Cum
1 BLD-CSTN-2-1 (9) : Earth work excavation for foundations and depositing on
bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308).

% of Total Qty 1 x 1 90% 18.00 Cum 210.92 1 Cum


2 BLD-CSTN-2-7 - (15) : Earth work excavation for foundations and depositing
on bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308).

% of Total Qty 1 x 1 10% 2.00 Cum 1893.14 1 Cum


3 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level:
Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate:
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work.for foundation and under flooring bed.

for Compound Wall 1 x 1 41.50 0.60 0.10 2.49


for gate Pillars 1 x 2 1.40 1.40 0.15 0.59
Deduction for gate pillars -1 x 2 1.40 0.60 0.10 -0.17
2.91 Cum 3785.55 1 Cum

447524687.xlsx-Park-BC Hostel 1798


Page 1799 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
4 BLD-CSTN-3-13- ( 30 ) - A- Nominal mix: RCC M- 20 Nominal mix
(Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS
456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and
its fabrication charges for finished item of work, but including centering and
shuttering charges for FOUNDATIONS, PLINTH, PEDESTALS

a Footings for Main Gate pillars 1 x 2 1.30 1.30 0.20 0.68 Cum 7930.76 1 Cum
b Pedastals for Gate pillars 1 x 2 0.45 0.45 0.90 0.36 Cum 8484.75 1 Cum
5 BLD-CSTN-3-13- ( 30 ) - B- Nominal mix: RCC M- 20 Nominal mix
(Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS
456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and
its fabrication charges for finished item of work, but including centering and
shuttering charges for COLUMNS, LINTELS, WATER TANKS, RCC WALLS
IN BUILDINGS - WOODEN SCAFFOLDING

for Gate pillars 1 x 2 0.30 0.30 2.70 0.49 Cum 9973.53 1 Cum
6 BLD-CSTN-6-12-(67) : Construction of RR Masonary in Cement Mortor
( 1:8 ) Prop using hard granite stone including cost & Conveyance of all
materials like Cement, Sand , Water, Granite Stones, including Seigniorage
Charges on all Materials, ,labour charges for cutting Stones to required size
and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges
curing etc., complete for finished item of Work .
For Foundations below GL
for Compound Wall 1 x 1 41.50 0.60 0.50 12.45
12.45 Cum 3470.13 1 Cum

447524687.xlsx-Park-BC Hostel 1799


Page 1800 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
7 BLD-CSTN-6-5-(60) : Construction of CRS Masonary 1st Sort in Cement
Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of
all materials like Cement, Sand , Water, Granite Stones, labour charges for
cutting Stones to required size and shape, mixing of Cement Mortor,
Construction, Scaffolding Charges curing etc., complete for finished item of
Work .
Compound Wall Front side excluding gate 1 x 1 37.50 0.45 0.60 10.13
for pillars for fixing MS grills in front side at every 3.00m C/C 1 x 15 0.45 0.45 1.50 4.56
Deduction for CRS pillars from wall -1 x 15 0.45 0.45 0.60 -1.82
Net Qty 12.87 Cum 4074.46 1 Cum
8 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level
Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work with nomonal reinforcement

Over CRS Walls in front side for fixing the Grills (0.15+0.2)/2 2 x 13 3.00 0.225 0.175 3.07
Over CRS Pillars in front side 1 x 15 0.45 0.45 0.075 0.23
3.30 Cum 5044.84 1 Cum
9 BLD-CSTN-7-1-(72) : Providing flush Cement Pointing to CRS Masonary in
Cement Mortor (1:3) Prop . for including cost & conveyance of all materials
to site , seignaiorage charges on all materials, labour charges on all
materials, curing etc., Complete for finished item of work
Both sides of CRS walls
Compound Wall Front side excluding gate 1 x 2 37.50 0.60 45.00
for pillars for fixing MS grills in front side at every 3.00m C/C 15 x 4 0.45 1.50 40.50
85.50 Sqm 86.17 1 Sqm

447524687.xlsx-Park-BC Hostel 1800


Page 1801 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
10 BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/
Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe
500 grade as per IS 1786-1979) of different diameters for RCC works ,
including labour charges for straightening, cutting, bending to required sizes
and shapes, placing in position with cover blocks of approved materials and
size and tying and lap-splicing with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and drawings, including cost
and conveyance of steel bars, including all wastages such as overlaps,
couplings, chairs, spacer bars including cost and conveyance of binding
wire, cover blocks and all incidental, operational, labour charges such as
cutting, bending, placing in position, tying including sales and other taxes on
all materials etc., complete for finished item of work in all floors.( APSS
No.126
For Footing & Pedastals 1.04 Cum 40.00 Kg/Cum 41.60
For Columns 0.49 Cum 125.00 Kg/Cum 61.25
102.85 Kg 68.71 1 Kg
11 Supplying and fixing of MS Grills as per Drawings including fixing with 4 Nos
of MS Z holdfasts (2 on each side) duly making cutting masonry, fixing and
making to original surface neatly and painting gate with one coat of red oxide
primer including cost and conveyance of all materials,Locking arrangment,
Ornamental pieces etc ,cutting, bending, welding including all operational
charges and all labour charges etc., complete for finished item of work.

MS Grills for compound wall @ 45 Kg/each ( 2.5 x1.35m) 1 x 13 45.00 Kg/each 585.00 Kg 88.05 1 Kg
Sub- Total for Compound wall - A

447524687.xlsx-Park-BC Hostel 1801


Page 1802 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
B Children Play Area
12 BLD-CSTN-2-1 (9) : Earth work excavation for foundations and depositing on
bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308). Data- Bld -
3
for foundations of Slide and Ladder 1 x 3 0.60 0.60 0.75 0.81
for foundations of Swing Two seater 1 x 2 0.60 0.60 0.75 0.54
for foundations of Spiral Swing 1 x 1 0.75 0.75 0.75 0.42
for foundations of Sea-Saw 4 seater 1 x 1 0.75 0.75 0.75 0.42
for foundations of Merry go round 1 x 1 0.75 0.75 0.90 0.51
for Idle Park bench 2 x 4 0.45 0.45 0.45 0.73
for filling Sand 1 x 1 21.50 14.10 0.30 90.95
94.38 Cum #REF! 1 Cum
13 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating
each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310)

Filling sand - Children play area 1 x 1 21.5 14.10 0.30 90.95 Cum 910.40 1 Cum
14 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level :
Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate:
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work.for foundation and under flooring bed. Data- Bld -
15
for foundations of Slide and Ladder 1 x 3 0.60 0.60 0.75 0.81
for foundations of Swing Two seater 1 x 2 0.60 0.60 0.75 0.54
for foundations of Spiral Swing 1 x 1 0.75 0.75 0.75 0.42
for foundations of Sea-Saw 4 seater 1 x 1 0.75 0.75 0.75 0.42
for foundations of Merry go round 1 x 1 0.75 0.75 0.90 0.51
for Idle Park bench 2 x 4 0.45 0.45 0.45 0.73
3.43 Cum 3785.55 1 Cum

447524687.xlsx-Park-BC Hostel 1802


Page 1803 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
15 Providing Children play equipment of standard make including cost and
conveyance of all material and all labour charges, all operational and
incidental charges etc complete.
Slide and Ladder 8 feet 1 x 1 1 No 18083.00 1 No
Swing Two seater 1 x 1 1 No 15087.00 1 No
Spiral Swing 1 x 1 1 No 18618.00 1 No
Sea-Saw 4 seater 1 x 1 1 No 13482.00 1 No
Merry go round 1 x 2 2 No 17013.00 1 No
Providing seating area development by providing cast Iron /Cement seats
as directed by Engineer incharge etc, complete.
Idle Park bench 1 x 2 2 No 13418.00 1 No
Sub- Total for Children Play area - D
E Garden Posts with LED Lamps
16 ELEC-13.2.2 : Fabrication and Supply of M.S. Poles for garden posts with 'B' ele ssr-7-
class 6 mtrs long 60.25mm outer dia with base plate and suitable pole cap 10-1 d
including cost and conveyance of all material including fixing of luminaire and
labour charges etc., complete. 6Mtrs 'B' Class M.S. pipe of 60.25mm dia with
base plate and suitable pole cap
Along the Path ways as per requirement 1 x 10 10 Nos #REF! 1 each
17 Supply and fixing of 50mm dia 0.5 mtrs single arm M.S. pipe bracket with
sleeve and fasteners with necessary angle including painting etc., complete
on existing pole including fixing of luminaire.
1 x 10 10 Nos #REF! 1 each
18 13.4.6 : Erection charges for 6Mtrs. Long MS / GI Garden post including
excavation of pit, concreting 1:3:6 and painting including cost and
conveyance of all materials including fixing of luminaire and labour charges
etc., complete.
Along the Path ways as per requirement 1 x 10 10 Nos #REF! 1 each
19 Supply and fixing of 300mm x 180mm x 140mm No.16 gauge CRCA sheet
box with hinged door and locking arrangements and din channel for fixing
2Nos MCBs duly powder coated with matching colour of poles including
fixing with necessary arrangments etc., complete.
1 x 10 10 Nos #REF! 1 each
20 Supply and fixing of 6-32A 10KA DP MCB, C/D Curve ISI Mark of make
Legrand / Schneider.
1 x 10 10 Nos #REF! 1 each

447524687.xlsx-Park-BC Hostel 1803


Page 1804 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
21 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain
Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of Data- Bld -
work with nomonal reinforcement Pi r2 d 18
a for Coping of Lamp post above GL 1 x 10 3.14 0.04 0.45 0.57 Cum 5044.84 1 Cum
22 ELEC-3.11.1: Supply and transportation of ......... LED Street light Body ele ssr-3-9-
made of high grade pressure die – cast Aluminum alloy with corrosion 15
resistant powder coat, having protective toughened glass cover, Less Glare,
IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66)
protected, universal Voltage 100 - 270 V AC, P.F, ≥ 0.90, high power LED's
having efficacy ≥130 lumens/watt, and junction temperature < 75°C, with
Ingress protection IP66, Driver surge protection 4KV, with optics distribution
Type II medium, THD<10% at 110 Volts AC, driver efficiency ≥90%, CCT:
5600K, minimum CRI≥80, Inbuilt Electrical protections like Over voltage,
short circuit, Over load, Open Circuit, Miswiring, Intelligent pole mounting
option provides flexibility of vertical or horizontal pole mounting option
complete, with Top Openable Maintenance and Manufacture has to submit
LM79,LM80 & Photobiological Safety Report. Luminaire Performance
Complies to IS10322 (Part 5/Sec 3) & IEC 60598-1,IEC 60529 and ISO
certified company. LUMINAIRE MAKE : PHILIPS / OSRAM / GE /
CROMPTON / BAJAJ / SCHREDER / VIN / HALONIX / HAVELLS / HPL.
LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG /
LG LEDs.

Along the Path ways as per requirement 1 x 10 10.00 Nos #REF! 1 each
23 BLD-ELEC-3-1-4 : Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C.
insulated flexible copper cable in existing pipe for mains inlcuding all labour
charges etc., complete.
1 x 10 5.00 50.00 Rmt #REF! 1 Rmt
24 BLD-ELEC-3-1-2 : Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C.
insulated flexible copper cable in existing pipe for earth continuity including
all labour charges etc., complete.
1 x 10 5.00 50.00 Rmt #REF! 1 Rmt

447524687.xlsx-Park-BC Hostel 1804


Page 1805 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
25 ELEC-4.1.3 : Supply of 6 Sqmm 2 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part -
I) of Makes : Torrent / Universal / Unicab / Polycab / Havells / Gloster / KEI
Under ground Cable connecting all poles and extra for pole to panel 1 x 10 40.00 400.00 Rmt #REF! 1 Rmt
26 ELEC-4.1.5 : Supply of 10 Sqmm 4 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part -
I) of Makes : Torrent / Universal / Unicab / Polycab / Havells / Gloster / KEI.
from Panel to incomming 1 x 1 30.00 30.00 Rmt #REF! 1 Rmt
27 ELEC-15.6.1 : Earth work excavation of Trench in hard ground soil, laying of
U.G cables upto 50 Sq,mm on sand cushion covering the cable with bricks
and back filling of Trench duly providing route indicator embedded in C.C
including cost and conveyance of materials and labour charges etc.,
complete.
for under ground Cabling 1 x 10 30.00 300.00 Rmt #REF! 1 Rmt
28 Supply, Transportation, fabrication and erection of following guage CRCA
sheet steel enclosure for power control cubicle panel / boxes etc., including
cutting, bending drilling, welding and reveting etc., complete with cleaning
with 7 tank process and painting with powder coating including cost and
conveyance of all materials and labour charges.
1 No of 0.9m x 1.20m size Box 1 x 1 1.200 0.900 1.08 Sqm #REF! 1 Sqm
29 BLD-ELEC-4-1-3: Supply and erection of Panel mounting cubical type ( 100
to 250A ) TPN 415V, 50 Hz. switch disconnector fuse unit complete with front
drive mechanism with door inter lock, padlocking arrangement etc., complete
with fuse links on existing control panel.
1 x 1 1.00 Nos #REF! 1 each
30 BLD-ELEC-4-3-3: Supply and erection of Panel mounting 125A, 4 Pole,
25kA, MCCB with thermal magnetic setting / Microprocessor based release
arrangement with all connections etc., complete on existing panel.
1 x 1 1.00 Nos #REF! 1 each
31 ELEC-3.5.1: Supply of Automatic Street Light Control System with Optical
Sensor, Low volatage / High voltage trip and reset, operating voltage 150 -
280V AC, 50 HZ with suitable SMC enclousure of IP 54 protection, MCBs
and contactor suitable to control the load of 3 KW of single phase load with
necessary clamping arrangements. Makes : Swadeep Nature Switch / Light
Mate.
1 x 1 1.00 Nos #REF! 1 each

447524687.xlsx-Park-BC Hostel 1805


Page 1806 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
32 BLD-ELEC-5-1-1 : Providing independent earthling by excavating a trench to
a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm
dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume
pipe ring duly providing staggered holes including filling with equal
proportion of Salt and Charcoal in layers and all labour charges etc.,
complete for small quarters.

2 Nos for Poles + 2 Nos for Panels 1 x 4 4 Nos #REF! 1 Rmt


Sub- Total for Garden Post Electrification - E
Total of A+B+C+D
33 Water fall Type fountain: (FRP) location :to be located on the two supporting
stone masanry pillars for projected height of 20 feet & width 10 feet with MS
angle for load bearing and water turf (over head tank) to be fabricated in
stainless steel size 8 ft lenght x 3 ft width x 3 ft. height and duly connected
with flexible pipe/GI pipe from the bottom collection & commisioning etc,.
including all civil works etc,. complete.

Fountain 1 x 1 1 Nos 400000.00 1 Rmt


Total Rs.

447524687.xlsx-Park-BC Hostel 1806


Page 1807 of 2191

f Divider and central lighting


near BC Hostel at APHB Colony
& ABSTRACT ESTIMATION

Amount

3797.00

3786.00

11016.00

447524687.xlsx-Park-BC Hostel 1807


Page 1808 of 2191

Amount

5393.00
3055.00

4887.00

43203.00

447524687.xlsx-Park-BC Hostel 1808


Page 1809 of 2191

Amount

52438.00

16648.00

7368.00

447524687.xlsx-Park-BC Hostel 1809


Page 1810 of 2191

Amount

7067.00

51509.00
210167.00

447524687.xlsx-Park-BC Hostel 1810


Page 1811 of 2191

Amount

#REF!

82800.88

12984.44

447524687.xlsx-Park-BC Hostel 1811


Page 1812 of 2191

Amount

18083.00
15087.00
18618.00
13482.00
34026.00

26836.00
#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

447524687.xlsx-Park-BC Hostel 1812


Page 1813 of 2191

Amount

2876.00

#REF!

#REF!

#REF!

447524687.xlsx-Park-BC Hostel 1813


Page 1814 of 2191

Amount

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

447524687.xlsx-Park-BC Hostel 1814


Page 1815 of 2191

Amount

#REF!
#REF!
#REF!

400000.00
#REF!

447524687.xlsx-Park-BC Hostel 1815


KODADA MUNICIPALITY

Development of Parks in Nalgonda Municipality, Under Amrut

GENERAL ABSTRACT

S.No Description of Items Quantity

1 Construction of Park nearShivaji Nagar 1 No

Sub-Total. A Rs.

2 Add VAT @ 5%

3 Add Labour Cess @ 1%

4 Provision towards QC @ 1%

5 Provision towards seiniorage charges


Provision towards Consultancy charges for Preparation of DPRs @
6
1.5%
7 L.S for Unforseen items

Sub-Total. B Rs.

Total Project Cost ( A+B ) Rs.

Say Rs.
Amrut

Amount in Rs.

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
Page 1818 of 2191

Construction of Divider and central lighting


Construction of Park at Shivaji Nagar
DETAILED & ABSTRACT ESTIMATION
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
A Compound Wall
Compound Wall Front side 1 x 1 10.00
Total length of the Compound Wall 10.00 0.60 0.60 3.60
for gate Pillars 1 x 2 1.40 1.40 1.50 5.88
Deduction for gate pillars -1 x 2 1.40 0.60 0.60 -1.01
8.47 Cum
1 BLD-CSTN-2-1 (9) : Earth work excavation for foundations and depositing on
bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308).

% of Total Qty 1 x 1 90% 8.00 Cum 210.92 1 Cum


2 BLD-CSTN-2-7 - (15) : Earth work excavation for foundations and depositing
on bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308).

% of Total Qty 1 x 1 10% 1.00 Cum 1893.14 1 Cum


3 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level:
Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate:
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work.for foundation and under flooring bed.

for Compound Wall 1 x 1 10.00 0.60 0.10 0.60


for gate Pillars 1 x 2 1.40 1.40 0.15 0.59
Deduction for gate pillars -1 x 2 1.40 0.60 0.10 -0.17
1.02 Cum 3785.55 1 Cum

447524687.xlsx-Park-Shivaji Nagar 1818


Page 1819 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
4 BLD-CSTN-3-13- ( 30 ) - A- Nominal mix: RCC M- 20 Nominal mix
(Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS
456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and
its fabrication charges for finished item of work, but including centering and
shuttering charges for FOUNDATIONS, PLINTH, PEDESTALS

a Footings for Main Gate pillars 1 x 2 1.30 1.30 0.20 0.68 Cum 7930.76 1 Cum
b Pedastals for Gate pillars 1 x 2 0.45 0.45 0.90 0.36 Cum 8484.75 1 Cum
5 BLD-CSTN-3-13- ( 30 ) - B- Nominal mix: RCC M- 20 Nominal mix
(Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS
456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and
its fabrication charges for finished item of work, but including centering and
shuttering charges for COLUMNS, LINTELS, WATER TANKS, RCC WALLS
IN BUILDINGS - WOODEN SCAFFOLDING

for Gate pillars 1 x 2 0.30 0.30 2.70 0.49 Cum 9973.53 1 Cum
6 BLD-CSTN-6-12-(67) : Construction of RR Masonary in Cement Mortor
( 1:8 ) Prop using hard granite stone including cost & Conveyance of all
materials like Cement, Sand , Water, Granite Stones, including Seigniorage
Charges on all Materials, ,labour charges for cutting Stones to required size
and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges
curing etc., complete for finished item of Work .

For Foundations below GL


for Compound Wall 1 x 1 10.00 0.60 0.50 3.00
3.00 Cum 3470.13 1 Cum

447524687.xlsx-Park-Shivaji Nagar 1819


Page 1820 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
7 BLD-CSTN-6-5-(60) : Construction of CRS Masonary 1st Sort in Cement
Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of
all materials like Cement, Sand , Water, Granite Stones, labour charges for
cutting Stones to required size and shape, mixing of Cement Mortor,
Construction, Scaffolding Charges curing etc., complete for finished item of
Work .
Compound Wall Front side excluding gate 1 x 1 6.00 0.45 0.60 1.62
for pillars for fixing MS grills in front side at every 3.00m C/C 1 x 3 0.45 0.45 1.50 0.91
Deduction for CRS pillars from wall -1 x 3 0.45 0.45 0.60 -0.36
Net Qty 2.17 Cum 4074.46 1 Cum
8 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level
Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work with nomonal reinforcement

Over CRS Walls in front side for fixing the Grills (0.15+0.2)/2 2 x 2 3.00 0.225 0.175 0.47
Over CRS Pillars in front side 1 x 3 0.45 0.45 0.075 0.05
0.52 Cum 5044.84 1 Cum
9 BLD-CSTN-7-1-(72) : Providing flush Cement Pointing to CRS Masonary in
Cement Mortor (1:3) Prop . for including cost & conveyance of all materials
to site , seignaiorage charges on all materials, labour charges on all
materials, curing etc., Complete for finished item of work
Both sides of CRS walls
Compound Wall Front side excluding gate 1 x 2 6.00 0.60 7.20
for pillars for fixing MS grills in front side at every 3.00m C/C 3 x 4 0.45 1.50 8.10
15.30 Sqm 86.17 1 Sqm

447524687.xlsx-Park-Shivaji Nagar 1820


Page 1821 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
10 BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/
Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe
500 grade as per IS 1786-1979) of different diameters for RCC works ,
including labour charges for straightening, cutting, bending to required sizes
and shapes, placing in position with cover blocks of approved materials and
size and tying and lap-splicing with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and drawings, including cost
and conveyance of steel bars, including all wastages such as overlaps,
couplings, chairs, spacer bars including cost and conveyance of binding
wire, cover blocks and all incidental, operational, labour charges such as
cutting, bending, placing in position, tying including sales and other taxes on
all materials etc., complete for finished item of work in all floors.( APSS
No.126
For Footing & Pedastals 1.04 Cum 40.00 Kg/Cum 41.60
For Columns 0.49 Cum 125.00 Kg/Cum 61.25
102.85 Kg 68.71 1 Kg
11 Supplying and fixing of MS Grills as per Drawings including fixing with 4 Nos
of MS Z holdfasts (2 on each side) duly making cutting masonry, fixing and
making to original surface neatly and painting gate with one coat of red oxide
primer including cost and conveyance of all materials,Locking arrangment,
Ornamental pieces etc ,cutting, bending, welding including all operational
charges and all labour charges etc., complete for finished item of work.

MS Grills for compound wall @ 45 Kg/each ( 2.5 x1.35m) 1 x 2 45.00 Kg/each 90.00 Kg 88.05 1 Kg
Sub- Total for Compound wall - A
B Path ways
12 BLD-CSTN-2-1 (9): Earth work excavation and depositing on bank for all lifts
and with an initial lead of 10m including all operational, incidental, labour
charges such as shoring ,sheeting, planking, strutting, etc. complete for
finished item of work including seigniorage excluding dewatering charges etc
as per SS - 20 B (APSS 308). Data- Bld -
3
a For Walking Track/ Path ways
Length of path ways-
for sectioning and levelling the ground for Pathways 1 x 1 160.00 2.00 0.200 64.00
for kerbing walls on both sides of the path ways 1 x 2 160.00 0.30 0.150 14.40
Total Qty 78.40 Cum 210.92 1 Cum

447524687.xlsx-Park-Shivaji Nagar 1821


Page 1822 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
13 RBR-TSRA-29 : Cast in Situ Cement Concrete M20 Kerb: Construction of
cement concrete kerb with top and bottom width 115 and 165 mm
respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150
mm thick, foundation having 50 mm projection beyond kerb stone, kerb
stone laid with kerb laying machine, foundation concrete laid manually, all
complete as per clause 408 MORTH data-
parks-22
for Kerbing of Pathways 1 x 2 160.00 320.00
320.00 Rmt 286.24 1 Rmt
14 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating
each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310) Data- Bld -
10
For levelling the track between walls 1 x 1 160.00 2.00 0.100 32.00
32.00 Cum 910.40 1 Cum
15 BLD-CSTN-3-6 ( 23 ) -Hand mixing up to Plinth Level : Plain Cement
concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse
aggregate ) using 40mm size Hard Granite Machine Crushed Metal including
cost and conveyance of all materials like cement, sand, coarse aggregate
water etc., to site , seigniorage charges on all materials, labour charges ,
for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface
to the required level curing etc., complete for finished item of work.for
foundation and under flooring bed. Data- Bld -
15
a For levelling the walking track between walls 1 x 1 160.00 2.00 0.100 32.00
Total Qty 32.00 Cum 3726.65 1 Cum
16 RBR-CCPV-13 - ii: Providing and Laying of Interlocking Concrete Block
Pavements using PHOENIX or equivalent high strength Cement Concrete
interlocking Regular Pavers of 50 mm thickness of M- 40 Grade of which top
12 mm thick shall be for colour pigmentation with imported colours and
white cement to get required reflective glazing inclusive of all taxes - as per
drawing and Technical Specification Clause 1504 MORD Data- Bld -
124
a For Walking Track/ Path ways 1 x 1 160.00 2.00 320.00
Total Qty 320.00 Sqm 570.70 1 Sqm
Sub- Total for Path ways -B
C Greenary & Play Area

447524687.xlsx-Park-Shivaji Nagar 1822


Page 1823 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
17 RBR-STCL-2 : Clearing and grubbing road land including uprooting wild
vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm,
removal of stumps of such trees cut earlier and disposal of unserviceable
materials and stacking of serviceable material to be used or auctioned, upto
a lead of 1000 m including removal and disposal of top organic soil not
exceeding 150 mm in thickness as per Technical Specification Clause 201
MORD / MORTH.

for clearing the site ( Area as o\per Drawing) 1 x 1 1600.00 1600.0 Sqm 22.92 10 Sqm
18 RBR-EECD-5 : ii: Excavation for roadway in soil by mechanical means
including cutting and pushing the earth to site of embankment upto a
distance of 100 m, including trimming bottom and side slopes in accordance
with requirements of lines, grades and cross-sections as per Technical
Specification Clause 302.3 MORD / 301 MORTH.
1 x 1 1600.00 0.250 400.00 Cum 46.65 1 Cum
19 Based on Item No.2 of HMDA (FSR), Pg.31 - FISCUE / SHADE GRASS
(Dibbling) : Making lawns by Dressing the surface to the desired shape,
laying 6" layer of fine red soil, covered with a thin layer of sand watering,
rolling with hand roller (4" thckness after rolling), including the cost of red
earth, sand and labour charges and the cost of fertlizers, chemical and grass
etc,. complete as per standard practice. Data -Parks
- 22
Area as per Drawing 1 x 1 1600.00
1600.00 Sqm 385.15 1 Sqm
20 Based on Item No.6.a of HMDA (FSR), Pg.31 -Ground Covers : Bed
preparation 6" layer of soil mixture 3:1:1 ratio red soil, farmyard manure and
river sand and application of fertolizers (@ 20 gms/pit/sqmt), smooth surface
as per design including cost of soil mixture, filling of the soil mixture and
internal transportation. Data -Parks
-8
Area as per Drawing 1 x 1 107.00 107.0
107.00 Rmt 280.63 1 Rmt
21 RBR-HRTC-9: Planting of trees by the road side (Avenue trees) in 0.60 m dia
holes, 1 m deep dug in the ground, mixing the soil with decayed farm
yard/sludge manure, planting the saplings, backfilling the trench, watering,
Data -Parks
fixing the tree guard and maintaining the plants for one year -9
Ornamental trees along the compound wall in side the park 1 x 60 60.00 Nos 1550.80 1 Nos

447524687.xlsx-Park-Shivaji Nagar 1823


Page 1824 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
22 Based on Item No.3.c of HMDA (FSR), Pg.31- Hedge/shrub planting: Digging
the trench of size 15cm depth, refilling the trench with red soil including cost
of red soil and farmyard manure at 4:1 ratio internal transportation of plants
and planting the plants including the application of fertilizers and perticides Data -Parks
26
etc., (A 20 gms/pit/sqmt) complete but excluding the cost of the fertilizers @
as
20 per Drawing along
gms/pit/sqmt) the compound
and plant material wall 1 x 1 60 60.00 Rmt 264.72 1 Rmt
23 Planting Speciman plants including digging of pits 60cm. Cubes, loosening of
15cm. Bottom red soil, filling with soil with 10 kg Compost + 100 DAP per pit
staking gap filling with in two month after planting.
Golden bamboo 8” 1 x 4 4 Nos 1483.91 1 No
Fercaria 2” 1 x 4 4 Nos 2069.03 1 No
Ficus 4” (Verites). 1 x 3 3 Nos 1199.88 1 No
Bottle Bush 1 x 3 3 Nos 1313.49 1 No
Sub- Total for Greenary - C
D Children Play Area
24 BLD-CSTN-2-1 (9) : Earth work excavation for foundations and depositing on
bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308). Data- Bld -
3
for foundations of Slide and Ladder 1 x 3 0.60 0.60 0.75 0.81
for foundations of Swing Two seater 1 x 2 0.60 0.60 0.75 0.54
for foundations of Spiral Swing 1 x 1 0.75 0.75 0.75 0.42
for foundations of Sea-Saw 4 seater 1 x 1 0.75 0.75 0.75 0.42
for foundations of Merry go round 1 x 1 0.75 0.75 0.90 0.51
for Idle Park bench 6 x 4 0.45 0.45 0.45 2.19
for filling Sand 1 x 1 21.50 14.10 0.30 90.95
95.84 Cum 210.92 1 Cum
25 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating
each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310)

Filling sand - Children play area 1 x 1 21.5 14.10 0.30 90.95 Cum 910.40 1 Cum

447524687.xlsx-Park-Shivaji Nagar 1824


Page 1825 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
26 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level :
Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate:
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work.for foundation and under flooring bed. Data- Bld -
15
for foundations of Slide and Ladder 1 x 3 0.60 0.60 0.75 0.81
for foundations of Swing Two seater 1 x 2 0.60 0.60 0.75 0.54
for foundations of Spiral Swing 1 x 1 0.75 0.75 0.75 0.42
for foundations of Sea-Saw 4 seater 1 x 1 0.75 0.75 0.75 0.42
for foundations of Merry go round 1 x 1 0.75 0.75 0.90 0.51
for Idle Park bench 6 x 4 0.45 0.45 0.45 2.19
4.89 Cum 3785.55 1 Cum
27 Providing Children play equipment of standard make including cost and
conveyance of all material and all labour charges, all operational and
incidental charges etc complete.
Slide and Ladder 8 feet 1 x 1 1 No 18083.00 1 No
Swing Two seater 1 x 1 1 No 15087.00 1 No
Spiral Swing 1 x 1 1 No 18618.00 1 No
Sea-Saw 4 seater 1 x 1 1 No 13482.00 1 No
Merry go round 1 x 2 2 No 17013.00 1 No
Providing seating area development by providing cast Iron /Cement seats
as directed by Engineer incharge etc, complete.
Idle Park bench 1 x 6 6 No 13418.00 1 No
Sub- Total for Children Play area - D
E Garden Posts with LED Lamps
28 ELEC-13.2.2 : Fabrication and Supply of M.S. Poles for garden posts with 'B' ele ssr-7-
class 6 mtrs long 60.25mm outer dia with base plate and suitable pole cap 10-1 d
including cost and conveyance of all material including fixing of luminaire and
labour charges etc., complete. 6Mtrs 'B' Class M.S. pipe of 60.25mm dia with
base plate and suitable pole cap
Along the Path ways as per requirement 1 x 5 5 Nos #REF! 1 each

447524687.xlsx-Park-Shivaji Nagar 1825


Page 1826 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
29 Supply and fixing of 50mm dia 0.5 mtrs single arm M.S. pipe bracket with
sleeve and fasteners with necessary angle including painting etc., complete
on existing pole including fixing of luminaire.
1 x 5 5 Nos #REF! 1 each

447524687.xlsx-Park-Shivaji Nagar 1826


Page 1827 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
30 13.4.6 : Erection charges for 6Mtrs. Long MS / GI Garden post including
excavation of pit, concreting 1:3:6 and painting including cost and
conveyance of all materials including fixing of luminaire and labour charges
etc., complete.
Along the Path ways as per requirement 1 x 5 5 Nos #REF! 1 each
31 Supply and fixing of 300mm x 180mm x 140mm No.16 gauge CRCA sheet
box with hinged door and locking arrangements and din channel for fixing
2Nos MCBs duly powder coated with matching colour of poles including
fixing with necessary arrangments etc., complete.
1 x 5 5 Nos #REF! 1 each
32 Supply and fixing of 6-32A 10KA DP MCB, C/D Curve ISI Mark of make
Legrand / Schneider.
1 x 5 5 Nos #REF! 1 each
33 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain
Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of Data- Bld -
work with nomonal reinforcement Pi r2 d 18
a for Coping of Lamp post above GL 1 x 5 3.14 0.04 0.45 0.28 Cum 5044.84 1 Cum

447524687.xlsx-Park-Shivaji Nagar 1827


Page 1828 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
34 ELEC-3.11.1: Supply and transportation of ......... LED Street light Body ele ssr-3-9-
made of high grade pressure die – cast Aluminum alloy with corrosion 15
resistant powder coat, having protective toughened glass cover, Less Glare,
IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66)
protected, universal Voltage 100 - 270 V AC, P.F, ≥ 0.90, high power LED's
having efficacy ≥130 lumens/watt, and junction temperature < 75°C, with
Ingress protection IP66, Driver surge protection 4KV, with optics distribution
Type II medium, THD<10% at 110 Volts AC, driver efficiency ≥90%, CCT:
5600K, minimum CRI≥80, Inbuilt Electrical protections like Over voltage,
short circuit, Over load, Open Circuit, Miswiring, Intelligent pole mounting
option provides flexibility of vertical or horizontal pole mounting option
complete, with Top Openable Maintenance and Manufacture has to submit
LM79,LM80 & Photobiological Safety Report. Luminaire Performance
Complies to IS10322 (Part 5/Sec 3) & IEC 60598-1,IEC 60529 and ISO
certified company. LUMINAIRE MAKE : PHILIPS / OSRAM / GE /
CROMPTON / BAJAJ / SCHREDER / VIN / HALONIX / HAVELLS / HPL.
LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG /
LG LEDs.

Along the Path ways as per requirement 1 x 5 5.00 Nos #REF! 1 each
35 BLD-ELEC-3-1-4 : Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C.
insulated flexible copper cable in existing pipe for mains inlcuding all labour
charges etc., complete.
1 x 5 5.00 25.00 Rmt #REF! 1 Rmt
36 BLD-ELEC-3-1-2 : Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C.
insulated flexible copper cable in existing pipe for earth continuity including
all labour charges etc., complete.
1 x 5 5.00 25.00 Rmt #REF! 1 Rmt
37 ELEC-4.1.3 : Supply of 6 Sqmm 2 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part -
I) of Makes : Torrent / Universal / Unicab / Polycab / Havells / Gloster / KEI

Under ground Cable connecting all poles and extra for pole to panel 1 x 5 40.00 200.00 Rmt #REF! 1 Rmt
38 ELEC-4.1.5 : Supply of 10 Sqmm 4 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part -
I) of Makes : Torrent / Universal / Unicab / Polycab / Havells / Gloster / KEI.
from Panel to incomming 1 x 1 30.00 30.00 Rmt #REF! 1 Rmt

447524687.xlsx-Park-Shivaji Nagar 1828


Page 1829 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
39 ELEC-15.6.1 : Earth work excavation of Trench in hard ground soil, laying of
U.G cables upto 50 Sq,mm on sand cushion covering the cable with bricks
and back filling of Trench duly providing route indicator embedded in C.C
including cost and conveyance of materials and labour charges etc.,
complete.
for under ground Cabling 1 x 5 30.00 150.00 Rmt #REF! 1 Rmt
40 Supply, Transportation, fabrication and erection of following guage CRCA
sheet steel enclosure for power control cubicle panel / boxes etc., including
cutting, bending drilling, welding and reveting etc., complete with cleaning
with 7 tank process and painting with powder coating including cost and
conveyance of all materials and labour charges.
1 No of 0.9m x 1.20m size Box 1 x 1 1.200 0.900 1.08 Sqm #REF! 1 Sqm
41 BLD-ELEC-4-1-3: Supply and erection of Panel mounting cubical type ( 100
to 250A ) TPN 415V, 50 Hz. switch disconnector fuse unit complete with front
drive mechanism with door inter lock, padlocking arrangement etc., complete
with fuse links on existing control panel.
1 x 1 1.00 Nos #REF! 1 each
42 BLD-ELEC-4-3-3: Supply and erection of Panel mounting 125A, 4 Pole,
25kA, MCCB with thermal magnetic setting / Microprocessor based release
arrangement with all connections etc., complete on existing panel.
1 x 1 1.00 Nos #REF! 1 each
43 ELEC-3.5.1: Supply of Automatic Street Light Control System with Optical
Sensor, Low volatage / High voltage trip and reset, operating voltage 150 -
280V AC, 50 HZ with suitable SMC enclousure of IP 54 protection, MCBs
and contactor suitable to control the load of 3 KW of single phase load with
necessary clamping arrangements. Makes : Swadeep Nature Switch / Light
Mate.
1 x 1 1.00 Nos #REF! 1 each
44 BLD-ELEC-5-1-1 : Providing independent earthling by excavating a trench to
a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm
dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume
pipe ring duly providing staggered holes including filling with equal
proportion of Salt and Charcoal in layers and all labour charges etc.,
complete for small quarters.

2 Nos for Poles + 2 Nos for Panels 1 x 4 4 Nos #REF! 1 Rmt


Sub- Total for Garden Post Electrification - E
Total of A+B+C+D

447524687.xlsx-Park-Shivaji Nagar 1829


Page 1830 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
45 Water fall Type fountain: (FRP) location :to be located on the two supporting
stone masanry pillars for projected height of 20 feet & width 10 feet with MS
angle for load bearing and water turf (over head tank) to be fabricated in
stainless steel size 8 ft lenght x 3 ft width x 3 ft. height and duly connected
with flexible pipe/GI pipe from the bottom collection & commisioning etc,.
including all civil works etc,. complete.

Fountain 1 x 1 1 Nos 200000.00 1 Rmt


Total Rs.

447524687.xlsx-Park-Shivaji Nagar 1830


Page 1831 of 2191

f Divider and central lighting


n of Park at Shivaji Nagar
& ABSTRACT ESTIMATION

Amount

1687.00

1893.00

3861.00

447524687.xlsx-Park-Shivaji Nagar 1831


Page 1832 of 2191

Amount

5393.00
3055.00

4887.00

10410.00

447524687.xlsx-Park-Shivaji Nagar 1832


Page 1833 of 2191

Amount

8842.00

2623.00

1318.00

447524687.xlsx-Park-Shivaji Nagar 1833


Page 1834 of 2191

Amount

7067.00

7925.00
58961.00

16536.13

447524687.xlsx-Park-Shivaji Nagar 1834


Page 1835 of 2191

Amount

91597.00

29132.80

119252.80

182624.00
439142.73

447524687.xlsx-Park-Shivaji Nagar 1835


Page 1836 of 2191

Amount

3667.20

18660.00

616240.00

30027.41

93048.00

447524687.xlsx-Park-Shivaji Nagar 1836


Page 1837 of 2191

Amount

15883.20

5935.64
8276.12
3599.64
3940.47
776950.48

20214.57

82800.88

447524687.xlsx-Park-Shivaji Nagar 1837


Page 1838 of 2191

Amount

18511.34

18083.00
15087.00
18618.00
13482.00
34026.00

80508.00
301330.79

#REF!

447524687.xlsx-Park-Shivaji Nagar 1838


Page 1839 of 2191

Amount

#REF!

447524687.xlsx-Park-Shivaji Nagar 1839


Page 1840 of 2191

Amount

#REF!

#REF!

#REF!

1413.00

447524687.xlsx-Park-Shivaji Nagar 1840


Page 1841 of 2191

Amount

#REF!

#REF!

#REF!

#REF!

#REF!

447524687.xlsx-Park-Shivaji Nagar 1841


Page 1842 of 2191

Amount

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
#REF!
#REF!

447524687.xlsx-Park-Shivaji Nagar 1842


Page 1843 of 2191

Amount

200000.00
#REF!

447524687.xlsx-Park-Shivaji Nagar 1843


KODADA MUNICIPALITY

Development of Parks in Miryalaguda Municipality, Under Amrut

GENERAL ABSTRACT

S.No Description of Items Quantity

1 Construction of Park near Venkateshwara Temple at APHB Colony 1 No

Sub-Total. A Rs.

2 Add VAT @ 5%

3 Add Labour Cess @ 1%

4 Provision towards QC @ 1%

5 Provision towards seiniorage charges


Provision towards Consultancy charges for Preparation of DPRs @
6
1.5%
7 L.S for Unforseen items

Sub-Total. B Rs.

Total Project Cost ( A+B ) Rs.

Say Rs.
r Amrut

Amount in Rs.

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
Page 1846 of 2191

Construction of Divider and central lighting


Construction of Park at Sri Nagar
DETAILED & ABSTRACT ESTIMATION
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
A Compound Wall
Compound Wall Front side 1 x 1 10.00
Total length of the Compound Wall 10.00 0.60 0.60 3.60
for gate Pillars 1 x 2 1.40 1.40 1.50 5.88
Deduction for gate pillars -1 x 2 1.40 0.60 0.60 -1.01
8.47 Cum
1 BLD-CSTN-2-1 (9) : Earth work excavation for foundations and depositing on
bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308).

% of Total Qty 1 x 1 90% 8.00 Cum 210.92 1 Cum


2 BLD-CSTN-2-7 - (15) : Earth work excavation for foundations and depositing
on bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308).

% of Total Qty 1 x 1 10% 1.00 Cum 1893.14 1 Cum


3 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level:
Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate:
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work.for foundation and under flooring bed.

for Compound Wall 1 x 1 10.00 0.60 0.10 0.60


for gate Pillars 1 x 2 1.40 1.40 0.15 0.59
Deduction for gate pillars -1 x 2 1.40 0.60 0.10 -0.17
1.02 Cum 3785.55 1 Cum

447524687.xlsx-Park-Sri Nagar 1846


Page 1847 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
4 BLD-CSTN-3-13- ( 30 ) - A- Nominal mix: RCC M- 20 Nominal mix
(Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS
456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and
its fabrication charges for finished item of work, but including centering and
shuttering charges for FOUNDATIONS, PLINTH, PEDESTALS

a Footings for Main Gate pillars 1 x 2 1.30 1.30 0.20 0.68 Cum 7930.76 1 Cum
b Pedastals for Gate pillars 1 x 2 0.45 0.45 0.90 0.36 Cum 8484.75 1 Cum
5 BLD-CSTN-3-13- ( 30 ) - B- Nominal mix: RCC M- 20 Nominal mix
(Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS
456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and
its fabrication charges for finished item of work, but including centering and
shuttering charges for COLUMNS, LINTELS, WATER TANKS, RCC WALLS
IN BUILDINGS - WOODEN SCAFFOLDING

for Gate pillars 1 x 2 0.30 0.30 2.70 0.49 Cum 9973.53 1 Cum
6 BLD-CSTN-6-12-(67) : Construction of RR Masonary in Cement Mortor
( 1:8 ) Prop using hard granite stone including cost & Conveyance of all
materials like Cement, Sand , Water, Granite Stones, including Seigniorage
Charges on all Materials, ,labour charges for cutting Stones to required size
and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges
curing etc., complete for finished item of Work .

For Foundations below GL


for Compound Wall 1 x 1 10.00 0.60 0.50 3.00
3.00 Cum 3470.13 1 Cum

447524687.xlsx-Park-Sri Nagar 1847


Page 1848 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
7 BLD-CSTN-6-5-(60) : Construction of CRS Masonary 1st Sort in Cement
Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of
all materials like Cement, Sand , Water, Granite Stones, labour charges for
cutting Stones to required size and shape, mixing of Cement Mortor,
Construction, Scaffolding Charges curing etc., complete for finished item of
Work .
Compound Wall Front side excluding gate 1 x 1 6.00 0.45 0.60 1.62
for pillars for fixing MS grills in front side at every 3.00m C/C 1 x 3 0.45 0.45 1.50 0.91
Deduction for CRS pillars from wall -1 x 3 0.45 0.45 0.60 -0.36
Net Qty 2.17 Cum 4074.46 1 Cum
8 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level
Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work with nomonal reinforcement

Over CRS Walls in front side for fixing the Grills (0.15+0.2)/2 2 x 2 3.00 0.225 0.175 0.47
Over CRS Pillars in front side 1 x 3 0.45 0.45 0.075 0.05
0.52 Cum 5044.84 1 Cum
9 BLD-CSTN-7-1-(72) : Providing flush Cement Pointing to CRS Masonary in
Cement Mortor (1:3) Prop . for including cost & conveyance of all materials
to site , seignaiorage charges on all materials, labour charges on all
materials, curing etc., Complete for finished item of work
Both sides of CRS walls
Compound Wall Front side excluding gate 1 x 2 6.00 0.60 7.20
for pillars for fixing MS grills in front side at every 3.00m C/C 3 x 4 0.45 1.50 8.10
15.30 Sqm 86.17 1 Sqm

447524687.xlsx-Park-Sri Nagar 1848


Page 1849 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
10 BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/
Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe
500 grade as per IS 1786-1979) of different diameters for RCC works ,
including labour charges for straightening, cutting, bending to required sizes
and shapes, placing in position with cover blocks of approved materials and
size and tying and lap-splicing with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and drawings, including cost
and conveyance of steel bars, including all wastages such as overlaps,
couplings, chairs, spacer bars including cost and conveyance of binding
wire, cover blocks and all incidental, operational, labour charges such as
cutting, bending, placing in position, tying including sales and other taxes on
all materials etc., complete for finished item of work in all floors.( APSS
No.126
For Footing & Pedastals 1.04 Cum 40.00 Kg/Cum 41.60
For Columns 0.49 Cum 125.00 Kg/Cum 61.25
102.85 Kg 68.71 1 Kg
11 Supplying and fixing of MS Grills as per Drawings including fixing with 4 Nos
of MS Z holdfasts (2 on each side) duly making cutting masonry, fixing and
making to original surface neatly and painting gate with one coat of red oxide
primer including cost and conveyance of all materials,Locking arrangment,
Ornamental pieces etc ,cutting, bending, welding including all operational
charges and all labour charges etc., complete for finished item of work.

MS Grills for compound wall @ 45 Kg/each ( 2.5 x1.35m) 1 x 2 45.00 Kg/each 90.00 Kg 88.05 1 Kg
Sub- Total for Compound wall - A
B Path ways
12 BLD-CSTN-2-1 (9): Earth work excavation and depositing on bank for all lifts
and with an initial lead of 10m including all operational, incidental, labour
charges such as shoring ,sheeting, planking, strutting, etc. complete for
finished item of work including seigniorage excluding dewatering charges etc
as per SS - 20 B (APSS 308). Data- Bld -
3
a For Walking Track/ Path ways
Length of path ways-
for sectioning and levelling the ground for Pathways 1 x 1 135.00 2.00 0.200 54.00
for kerbing walls on both sides of the path ways 1 x 2 135.00 0.30 0.150 12.15
Total Qty 66.15 Cum 210.92 1 Cum

447524687.xlsx-Park-Sri Nagar 1849


Page 1850 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
13 RBR-TSRA-29 : Cast in Situ Cement Concrete M20 Kerb: Construction of
cement concrete kerb with top and bottom width 115 and 165 mm
respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150
mm thick, foundation having 50 mm projection beyond kerb stone, kerb
stone laid with kerb laying machine, foundation concrete laid manually, all
complete as per clause 408 MORTH data-
parks-22
for Kerbing of Pathways 1 x 2 135.00 270.00
270.00 Rmt 286.24 1 Rmt
14 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating
each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310) Data- Bld -
10
For levelling the track between walls 1 x 1 135.00 2.00 0.100 27.00
27.00 Cum 910.40 1 Cum
15 BLD-CSTN-3-6 ( 23 ) -Hand mixing up to Plinth Level : Plain Cement
concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse
aggregate ) using 40mm size Hard Granite Machine Crushed Metal including
cost and conveyance of all materials like cement, sand, coarse aggregate
water etc., to site , seigniorage charges on all materials, labour charges ,
for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface
to the required level curing etc., complete for finished item of work.for
foundation and under flooring bed. Data- Bld -
15
a For levelling the walking track between walls 1 x 1 135.00 2.00 0.100 27.00
Total Qty 27.00 Cum 3726.65 1 Cum
16 RBR-CCPV-13 - ii: Providing and Laying of Interlocking Concrete Block
Pavements using PHOENIX or equivalent high strength Cement Concrete
interlocking Regular Pavers of 50 mm thickness of M- 40 Grade of which top
12 mm thick shall be for colour pigmentation with imported colours and
white cement to get required reflective glazing inclusive of all taxes - as per
drawing and Technical Specification Clause 1504 MORD Data- Bld -
124
a For Walking Track/ Path ways 1 x 1 135.00 2.00 270.00
Total Qty 270.00 Sqm 570.70 1 Sqm
Sub- Total for Path ways -B
C Greenary & Play Area

447524687.xlsx-Park-Sri Nagar 1850


Page 1851 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
17 RBR-STCL-2 : Clearing and grubbing road land including uprooting wild
vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm,
removal of stumps of such trees cut earlier and disposal of unserviceable
materials and stacking of serviceable material to be used or auctioned, upto
a lead of 1000 m including removal and disposal of top organic soil not
exceeding 150 mm in thickness as per Technical Specification Clause 201
MORD / MORTH.

for clearing the site ( Area as o\per Drawing) 1 x 1 720.00 720.0 Sqm 22.92 10 Sqm
18 RBR-EECD-5 : ii: Excavation for roadway in soil by mechanical means
including cutting and pushing the earth to site of embankment upto a
distance of 100 m, including trimming bottom and side slopes in accordance
with requirements of lines, grades and cross-sections as per Technical
Specification Clause 302.3 MORD / 301 MORTH.
1 x 1 720.00 0.250 180.00 Cum 46.65 1 Cum
19 Based on Item No.2 of HMDA (FSR), Pg.31 - FISCUE / SHADE GRASS
(Dibbling) : Making lawns by Dressing the surface to the desired shape,
laying 6" layer of fine red soil, covered with a thin layer of sand watering,
rolling with hand roller (4" thckness after rolling), including the cost of red
earth, sand and labour charges and the cost of fertlizers, chemical and grass
etc,. complete as per standard practice. Data -Parks
- 22
Area as per Drawing 1 x 1 720.00
720.00 Sqm 385.15 1 Sqm
20 Based on Item No.6.a of HMDA (FSR), Pg.31 -Ground Covers : Bed
preparation 6" layer of soil mixture 3:1:1 ratio red soil, farmyard manure and
river sand and application of fertolizers (@ 20 gms/pit/sqmt), smooth surface
as per design including cost of soil mixture, filling of the soil mixture and
internal transportation. Data -Parks
-8
Area as per Drawing 1 x 1 48.00 48.0
48.00 Rmt 280.63 1 Rmt
21 RBR-HRTC-9: Planting of trees by the road side (Avenue trees) in 0.60 m dia
holes, 1 m deep dug in the ground, mixing the soil with decayed farm
yard/sludge manure, planting the saplings, backfilling the trench, watering,
Data -Parks
fixing the tree guard and maintaining the plants for one year -9
Ornamental trees along the compound wall in side the park 1 x 41 41.00 Nos 1550.80 1 Nos

447524687.xlsx-Park-Sri Nagar 1851


Page 1852 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
22 Based on Item No.3.c of HMDA (FSR), Pg.31- Hedge/shrub planting: Digging
the trench of size 15cm depth, refilling the trench with red soil including cost
of red soil and farmyard manure at 4:1 ratio internal transportation of plants
and planting the plants including the application of fertilizers and perticides Data -Parks
26
etc., (A 20 gms/pit/sqmt) complete but excluding the cost of the fertilizers @
as
20 per Drawing along
gms/pit/sqmt) the compound
and plant material wall 1 x 1 41 41.00 Rmt 264.72 1 Rmt
23 Planting Speciman plants including digging of pits 60cm. Cubes, loosening of
15cm. Bottom red soil, filling with soil with 10 kg Compost + 100 DAP per pit
staking gap filling with in two month after planting.
Golden bamboo 8” 1 x 4 4 Nos 1483.91 1 No
Fercaria 2” 1 x 4 4 Nos 2069.03 1 No
Ficus 4” (Verites). 1 x 3 3 Nos 1199.88 1 No
Bottle Bush 1 x 3 3 Nos 1313.49 1 No
Sub- Total for Greenary - C
D Children Play Area
24 BLD-CSTN-2-1 (9) : Earth work excavation for foundations and depositing on
bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308). Data- Bld -
3
for foundations of Slide and Ladder 1 x 3 0.60 0.60 0.75 0.81
for foundations of Swing Two seater 1 x 2 0.60 0.60 0.75 0.54
for foundations of Spiral Swing 1 x 1 0.75 0.75 0.75 0.42
for foundations of Sea-Saw 4 seater 1 x 1 0.75 0.75 0.75 0.42
for foundations of Merry go round 1 x 1 0.75 0.75 0.90 0.51
for Idle Park bench 6 x 4 0.45 0.45 0.45 2.19
for filling Sand 1 x 1 21.50 14.10 0.30 90.95
95.84 Cum 210.92 1 Cum
25 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating
each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310)

Filling sand - Children play area 1 x 1 21.5 14.10 0.30 90.95 Cum 910.40 1 Cum

447524687.xlsx-Park-Sri Nagar 1852


Page 1853 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
26 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level :
Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate:
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work.for foundation and under flooring bed. Data- Bld -
15
for foundations of Slide and Ladder 1 x 3 0.60 0.60 0.75 0.81
for foundations of Swing Two seater 1 x 2 0.60 0.60 0.75 0.54
for foundations of Spiral Swing 1 x 1 0.75 0.75 0.75 0.42
for foundations of Sea-Saw 4 seater 1 x 1 0.75 0.75 0.75 0.42
for foundations of Merry go round 1 x 1 0.75 0.75 0.90 0.51
for Idle Park bench 6 x 4 0.45 0.45 0.45 2.19
4.89 Cum 3785.55 1 Cum
27 Providing Children play equipment of standard make including cost and
conveyance of all material and all labour charges, all operational and
incidental charges etc complete.
Slide and Ladder 8 feet 1 x 1 1 No 18083.00 1 No
Swing Two seater 1 x 1 1 No 15087.00 1 No
Spiral Swing 1 x 1 1 No 18618.00 1 No
Sea-Saw 4 seater 1 x 1 1 No 13482.00 1 No
Merry go round 1 x 2 2 No 17013.00 1 No
Providing seating area development by providing cast Iron /Cement seats
as directed by Engineer incharge etc, complete.
Idle Park bench 1 x 6 6 No 13418.00 1 No
Sub- Total for Children Play area - D
E Garden Posts with LED Lamps
28 ELEC-13.2.2 : Fabrication and Supply of M.S. Poles for garden posts with 'B' ele ssr-7-
class 6 mtrs long 60.25mm outer dia with base plate and suitable pole cap 10-1 d
including cost and conveyance of all material including fixing of luminaire and
labour charges etc., complete. 6Mtrs 'B' Class M.S. pipe of 60.25mm dia with
base plate and suitable pole cap
Along the Path ways as per requirement 1 x 5 5 Nos #REF! 1 each

447524687.xlsx-Park-Sri Nagar 1853


Page 1854 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
29 Supply and fixing of 50mm dia 0.5 mtrs single arm M.S. pipe bracket with
sleeve and fasteners with necessary angle including painting etc., complete
on existing pole including fixing of luminaire.
1 x 5 5 Nos #REF! 1 each
30 13.4.6 : Erection charges for 6Mtrs. Long MS / GI Garden post including
excavation of pit, concreting 1:3:6 and painting including cost and
conveyance of all materials including fixing of luminaire and labour charges
etc., complete.
Along the Path ways as per requirement 1 x 5 5 Nos #REF! 1 each
31 Supply and fixing of 300mm x 180mm x 140mm No.16 gauge CRCA sheet
box with hinged door and locking arrangements and din channel for fixing
2Nos MCBs duly powder coated with matching colour of poles including
fixing with necessary arrangments etc., complete.
1 x 5 5 Nos #REF! 1 each
32 Supply and fixing of 6-32A 10KA DP MCB, C/D Curve ISI Mark of make
Legrand / Schneider.
1 x 5 5 Nos #REF! 1 each
33 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain
Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of Data- Bld -
work with nomonal reinforcement Pi r2 d 18
a for Coping of Lamp post above GL 1 x 5 3.14 0.04 0.45 0.28 Cum 5044.84 1 Cum

447524687.xlsx-Park-Sri Nagar 1854


Page 1855 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
34 ELEC-3.11.1: Supply and transportation of ......... LED Street light Body ele ssr-3-9-
made of high grade pressure die – cast Aluminum alloy with corrosion 15
resistant powder coat, having protective toughened glass cover, Less Glare,
IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66)
protected, universal Voltage 100 - 270 V AC, P.F, ≥ 0.90, high power LED's
having efficacy ≥130 lumens/watt, and junction temperature < 75°C, with
Ingress protection IP66, Driver surge protection 4KV, with optics distribution
Type II medium, THD<10% at 110 Volts AC, driver efficiency ≥90%, CCT:
5600K, minimum CRI≥80, Inbuilt Electrical protections like Over voltage,
short circuit, Over load, Open Circuit, Miswiring, Intelligent pole mounting
option provides flexibility of vertical or horizontal pole mounting option
complete, with Top Openable Maintenance and Manufacture has to submit
LM79,LM80 & Photobiological Safety Report. Luminaire Performance
Complies to IS10322 (Part 5/Sec 3) & IEC 60598-1,IEC 60529 and ISO
certified company. LUMINAIRE MAKE : PHILIPS / OSRAM / GE /
CROMPTON / BAJAJ / SCHREDER / VIN / HALONIX / HAVELLS / HPL.
LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG /
LG LEDs.

Along the Path ways as per requirement 1 x 5 5.00 Nos #REF! 1 each
35 BLD-ELEC-3-1-4 : Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C.
insulated flexible copper cable in existing pipe for mains inlcuding all labour
charges etc., complete.
1 x 5 5.00 25.00 Rmt #REF! 1 Rmt
36 BLD-ELEC-3-1-2 : Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C.
insulated flexible copper cable in existing pipe for earth continuity including
all labour charges etc., complete.
1 x 5 5.00 25.00 Rmt #REF! 1 Rmt
37 ELEC-4.1.3 : Supply of 6 Sqmm 2 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part -
I) of Makes : Torrent / Universal / Unicab / Polycab / Havells / Gloster / KEI

Under ground Cable connecting all poles and extra for pole to panel 1 x 5 40.00 200.00 Rmt #REF! 1 Rmt
38 ELEC-4.1.5 : Supply of 10 Sqmm 4 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part -
I) of Makes : Torrent / Universal / Unicab / Polycab / Havells / Gloster / KEI.
from Panel to incomming 1 x 1 30.00 30.00 Rmt #REF! 1 Rmt

447524687.xlsx-Park-Sri Nagar 1855


Page 1856 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
39 ELEC-15.6.1 : Earth work excavation of Trench in hard ground soil, laying of
U.G cables upto 50 Sq,mm on sand cushion covering the cable with bricks
and back filling of Trench duly providing route indicator embedded in C.C
including cost and conveyance of materials and labour charges etc.,
complete.
for under ground Cabling 1 x 5 30.00 150.00 Rmt #REF! 1 Rmt
40 Supply, Transportation, fabrication and erection of following guage CRCA
sheet steel enclosure for power control cubicle panel / boxes etc., including
cutting, bending drilling, welding and reveting etc., complete with cleaning
with 7 tank process and painting with powder coating including cost and
conveyance of all materials and labour charges.
1 No of 0.9m x 1.20m size Box 1 x 1 1.200 0.900 1.08 Sqm #REF! 1 Sqm
41 BLD-ELEC-4-1-3: Supply and erection of Panel mounting cubical type ( 100
to 250A ) TPN 415V, 50 Hz. switch disconnector fuse unit complete with front
drive mechanism with door inter lock, padlocking arrangement etc., complete
with fuse links on existing control panel.
1 x 1 1.00 Nos #REF! 1 each
42 BLD-ELEC-4-3-3: Supply and erection of Panel mounting 125A, 4 Pole,
25kA, MCCB with thermal magnetic setting / Microprocessor based release
arrangement with all connections etc., complete on existing panel.
1 x 1 1.00 Nos #REF! 1 each
43 ELEC-3.5.1: Supply of Automatic Street Light Control System with Optical
Sensor, Low volatage / High voltage trip and reset, operating voltage 150 -
280V AC, 50 HZ with suitable SMC enclousure of IP 54 protection, MCBs
and contactor suitable to control the load of 3 KW of single phase load with
necessary clamping arrangements. Makes : Swadeep Nature Switch / Light
Mate.
1 x 1 1.00 Nos #REF! 1 each
44 BLD-ELEC-5-1-1 : Providing independent earthling by excavating a trench to
a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm
dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume
pipe ring duly providing staggered holes including filling with equal
proportion of Salt and Charcoal in layers and all labour charges etc.,
complete for small quarters.

2 Nos for Poles + 2 Nos for Panels 1 x 4 4 Nos #REF! 1 Rmt


Sub- Total for Garden Post Electrification - E
Total of A+B+C+D

447524687.xlsx-Park-Sri Nagar 1856


Page 1857 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
45 Water fall Type fountain: (FRP) location :to be located on the two supporting
stone masanry pillars for projected height of 20 feet & width 10 feet with MS
angle for load bearing and water turf (over head tank) to be fabricated in
stainless steel size 8 ft lenght x 3 ft width x 3 ft. height and duly connected
with flexible pipe/GI pipe from the bottom collection & commisioning etc,.
including all civil works etc,. complete.

Fountain 1 x 1 1 Nos 200000.00 1 Rmt


Total Rs.

447524687.xlsx-Park-Sri Nagar 1857


Page 1858 of 2191

f Divider and central lighting


on of Park at Sri Nagar
& ABSTRACT ESTIMATION

Amount

1687.00

1893.00

3861.00

447524687.xlsx-Park-Sri Nagar 1858


Page 1859 of 2191

Amount

5393.00
3055.00

4887.00

10410.00

447524687.xlsx-Park-Sri Nagar 1859


Page 1860 of 2191

Amount

8842.00

2623.00

1318.00

447524687.xlsx-Park-Sri Nagar 1860


Page 1861 of 2191

Amount

7067.00

7925.00
58961.00

13952.36

447524687.xlsx-Park-Sri Nagar 1861


Page 1862 of 2191

Amount

77285.00

24580.80

100619.55

154089.00
370526.71

447524687.xlsx-Park-Sri Nagar 1862


Page 1863 of 2191

Amount

1650.24

8397.00

277308.00

13470.24

63582.80

447524687.xlsx-Park-Sri Nagar 1863


Page 1864 of 2191

Amount

10853.52

5935.64
8276.12
3599.64
3940.47
386966.43

20214.57

82800.88

447524687.xlsx-Park-Sri Nagar 1864


Page 1865 of 2191

Amount

18511.34

18083.00
15087.00
18618.00
13482.00
34026.00

80508.00
301330.79

#REF!

447524687.xlsx-Park-Sri Nagar 1865


Page 1866 of 2191

Amount

#REF!

#REF!

#REF!

#REF!

1413.00

447524687.xlsx-Park-Sri Nagar 1866


Page 1867 of 2191

Amount

#REF!

#REF!

#REF!

#REF!

#REF!

447524687.xlsx-Park-Sri Nagar 1867


Page 1868 of 2191

Amount

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
#REF!
#REF!

447524687.xlsx-Park-Sri Nagar 1868


Page 1869 of 2191

Amount

200000.00
#REF!

447524687.xlsx-Park-Sri Nagar 1869


KODADA MUNICIPALITY

Development of Parks in Miryalaguda Municipality, Under Amrut

GENERAL ABSTRACT

S.No Description of Items Quantity

1 Construction of Park near Venkateshwara Temple at APHB Colony 1 No

Sub-Total. A Rs.

2 Add VAT @ 5%

3 Add Labour Cess @ 1%

4 Provision towards QC @ 1%

5 Provision towards seiniorage charges


Provision towards Consultancy charges for Preparation of DPRs @
6
1.5%
7 L.S for Unforseen items

Sub-Total. B Rs.

Total Project Cost ( A+B ) Rs.

Say Rs.
r Amrut

Amount in Rs.

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
Page 1872 of 2191

Construction of Divider and central lighting


Construction of Park at Banda Narender Reddy Nagar
DETAILED & ABSTRACT ESTIMATION
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
A Compound Wall
Compound Wall Front side 1 x 1 10.00
Total length of the Compound Wall 10.00 0.60 0.60 3.60
for gate Pillars 1 x 2 1.40 1.40 1.50 5.88
Deduction for gate pillars -1 x 2 1.40 0.60 0.60 -1.01
8.47 Cum
1 BLD-CSTN-2-1 (9) : Earth work excavation for foundations and depositing on
bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308).

% of Total Qty 1 x 1 90% 8.00 Cum 210.92 1 Cum


2 BLD-CSTN-2-7 - (15) : Earth work excavation for foundations and depositing
on bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308).

% of Total Qty 1 x 1 10% 1.00 Cum 1893.14 1 Cum


3 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level:
Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate:
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work.for foundation and under flooring bed.

for Compound Wall 1 x 1 10.00 0.60 0.10 0.60


for gate Pillars 1 x 2 1.40 1.40 0.15 0.59
Deduction for gate pillars -1 x 2 1.40 0.60 0.10 -0.17
1.02 Cum 3785.55 1 Cum

447524687.xlsx-Park-Banda Narender Reddy 1872


Page 1873 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
4 BLD-CSTN-3-13- ( 30 ) - A- Nominal mix: RCC M- 20 Nominal mix
(Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS
456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and
its fabrication charges for finished item of work, but including centering and
shuttering charges for FOUNDATIONS, PLINTH, PEDESTALS

a Footings for Main Gate pillars 1 x 2 1.30 1.30 0.20 0.68 Cum 7930.76 1 Cum
b Pedastals for Gate pillars 1 x 2 0.45 0.45 0.90 0.36 Cum 8484.75 1 Cum
5 BLD-CSTN-3-13- ( 30 ) - B- Nominal mix: RCC M- 20 Nominal mix
(Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS
456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and
its fabrication charges for finished item of work, but including centering and
shuttering charges for COLUMNS, LINTELS, WATER TANKS, RCC WALLS
IN BUILDINGS - WOODEN SCAFFOLDING

for Gate pillars 1 x 2 0.30 0.30 2.70 0.49 Cum 9973.53 1 Cum
6 BLD-CSTN-6-12-(67) : Construction of RR Masonary in Cement Mortor
( 1:8 ) Prop using hard granite stone including cost & Conveyance of all
materials like Cement, Sand , Water, Granite Stones, including Seigniorage
Charges on all Materials, ,labour charges for cutting Stones to required size
and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges
curing etc., complete for finished item of Work .

For Foundations below GL


for Compound Wall 1 x 1 10.00 0.60 0.50 3.00
3.00 Cum 3470.13 1 Cum

447524687.xlsx-Park-Banda Narender Reddy 1873


Page 1874 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
7 BLD-CSTN-6-5-(60) : Construction of CRS Masonary 1st Sort in Cement
Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of
all materials like Cement, Sand , Water, Granite Stones, labour charges for
cutting Stones to required size and shape, mixing of Cement Mortor,
Construction, Scaffolding Charges curing etc., complete for finished item of
Work .
Compound Wall Front side excluding gate 1 x 1 6.00 0.45 0.60 1.62
for pillars for fixing MS grills in front side at every 3.00m C/C 1 x 3 0.45 0.45 1.50 0.91
Deduction for CRS pillars from wall -1 x 3 0.45 0.45 0.60 -0.36
Net Qty 2.17 Cum 4074.46 1 Cum
8 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level
Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work with nomonal reinforcement

Over CRS Walls in front side for fixing the Grills (0.15+0.2)/2 2 x 2 3.00 0.225 0.175 0.47
Over CRS Pillars in front side 1 x 3 0.45 0.45 0.075 0.05
0.52 Cum 5044.84 1 Cum
9 BLD-CSTN-7-1-(72) : Providing flush Cement Pointing to CRS Masonary in
Cement Mortor (1:3) Prop . for including cost & conveyance of all materials
to site , seignaiorage charges on all materials, labour charges on all
materials, curing etc., Complete for finished item of work
Both sides of CRS walls
Compound Wall Front side excluding gate 1 x 2 6.00 0.60 7.20
for pillars for fixing MS grills in front side at every 3.00m C/C 3 x 4 0.45 1.50 8.10
15.30 Sqm 86.17 1 Sqm

447524687.xlsx-Park-Banda Narender Reddy 1874


Page 1875 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
10 BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/
Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe
500 grade as per IS 1786-1979) of different diameters for RCC works ,
including labour charges for straightening, cutting, bending to required sizes
and shapes, placing in position with cover blocks of approved materials and
size and tying and lap-splicing with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and drawings, including cost
and conveyance of steel bars, including all wastages such as overlaps,
couplings, chairs, spacer bars including cost and conveyance of binding
wire, cover blocks and all incidental, operational, labour charges such as
cutting, bending, placing in position, tying including sales and other taxes on
all materials etc., complete for finished item of work in all floors.( APSS
No.126
For Footing & Pedastals 1.04 Cum 40.00 Kg/Cum 41.60
For Columns 0.49 Cum 125.00 Kg/Cum 61.25
102.85 Kg 68.71 1 Kg
11 Supplying and fixing of MS Grills as per Drawings including fixing with 4 Nos
of MS Z holdfasts (2 on each side) duly making cutting masonry, fixing and
making to original surface neatly and painting gate with one coat of red oxide
primer including cost and conveyance of all materials,Locking arrangment,
Ornamental pieces etc ,cutting, bending, welding including all operational
charges and all labour charges etc., complete for finished item of work.

MS Grills for compound wall @ 45 Kg/each ( 2.5 x1.35m) 1 x 2 45.00 Kg/each 90.00 Kg 88.05 1 Kg
Sub- Total for Compound wall - A
B Path ways
12 BLD-CSTN-2-1 (9): Earth work excavation and depositing on bank for all lifts
and with an initial lead of 10m including all operational, incidental, labour
charges such as shoring ,sheeting, planking, strutting, etc. complete for
finished item of work including seigniorage excluding dewatering charges etc
as per SS - 20 B (APSS 308). Data- Bld -
3
a For Walking Track/ Path ways
Length of path ways-
for sectioning and levelling the ground for Pathways 1 x 1 54.00 2.00 0.200 21.60
for kerbing walls on both sides of the path ways 1 x 2 54.00 0.30 0.150 4.86
Total Qty 26.46 Cum 210.92 1 Cum

447524687.xlsx-Park-Banda Narender Reddy 1875


Page 1876 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
13 RBR-TSRA-29 : Cast in Situ Cement Concrete M20 Kerb: Construction of
cement concrete kerb with top and bottom width 115 and 165 mm
respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150
mm thick, foundation having 50 mm projection beyond kerb stone, kerb
stone laid with kerb laying machine, foundation concrete laid manually, all
complete as per clause 408 MORTH data-
parks-22
for Kerbing of Pathways 1 x 2 54.00 108.00
108.00 Rmt 286.24 1 Rmt
14 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating
each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310) Data- Bld -
10
For levelling the track between walls 1 x 1 54.00 2.00 0.100 10.80
10.80 Cum 910.40 1 Cum
15 BLD-CSTN-3-6 ( 23 ) -Hand mixing up to Plinth Level : Plain Cement
concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse
aggregate ) using 40mm size Hard Granite Machine Crushed Metal including
cost and conveyance of all materials like cement, sand, coarse aggregate
water etc., to site , seigniorage charges on all materials, labour charges ,
for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface
to the required level curing etc., complete for finished item of work.for
foundation and under flooring bed. Data- Bld -
15
a For levelling the walking track between walls 1 x 1 54.00 2.00 0.100 10.80
Total Qty 10.80 Cum 3726.65 1 Cum
16 RBR-CCPV-13 - ii: Providing and Laying of Interlocking Concrete Block
Pavements using PHOENIX or equivalent high strength Cement Concrete
interlocking Regular Pavers of 50 mm thickness of M- 40 Grade of which top
12 mm thick shall be for colour pigmentation with imported colours and
white cement to get required reflective glazing inclusive of all taxes - as per
drawing and Technical Specification Clause 1504 MORD Data- Bld -
124
a For Walking Track/ Path ways 1 x 1 54.00 2.00 108.00
Total Qty 108.00 Sqm 570.70 1 Sqm
Sub- Total for Path ways -B
C Greenary & Play Area

447524687.xlsx-Park-Banda Narender Reddy 1876


Page 1877 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
17 RBR-STCL-2 : Clearing and grubbing road land including uprooting wild
vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm,
removal of stumps of such trees cut earlier and disposal of unserviceable
materials and stacking of serviceable material to be used or auctioned, upto
a lead of 1000 m including removal and disposal of top organic soil not
exceeding 150 mm in thickness as per Technical Specification Clause 201
MORD / MORTH.

for clearing the site ( Area as o\per Drawing) 1 x 1 210.00 210.0 Sqm 22.92 10 Sqm
18 RBR-EECD-5 : ii: Excavation for roadway in soil by mechanical means
including cutting and pushing the earth to site of embankment upto a
distance of 100 m, including trimming bottom and side slopes in accordance
with requirements of lines, grades and cross-sections as per Technical
Specification Clause 302.3 MORD / 301 MORTH.
1 x 1 210.00 0.250 52.50 Cum 46.65 1 Cum
19 Based on Item No.2 of HMDA (FSR), Pg.31 - FISCUE / SHADE GRASS
(Dibbling) : Making lawns by Dressing the surface to the desired shape,
laying 6" layer of fine red soil, covered with a thin layer of sand watering,
rolling with hand roller (4" thckness after rolling), including the cost of red
earth, sand and labour charges and the cost of fertlizers, chemical and grass
etc,. complete as per standard practice. Data -Parks
- 22
Area as per Drawing 1 x 1 210.00
210.00 Sqm 385.15 1 Sqm
20 Based on Item No.6.a of HMDA (FSR), Pg.31 -Ground Covers : Bed
preparation 6" layer of soil mixture 3:1:1 ratio red soil, farmyard manure and
river sand and application of fertolizers (@ 20 gms/pit/sqmt), smooth surface
as per design including cost of soil mixture, filling of the soil mixture and
internal transportation. Data -Parks
-8
Area as per Drawing 1 x 1 14.00 14.0
14.00 Rmt 280.63 1 Rmt
21 RBR-HRTC-9: Planting of trees by the road side (Avenue trees) in 0.60 m dia
holes, 1 m deep dug in the ground, mixing the soil with decayed farm
yard/sludge manure, planting the saplings, backfilling the trench, watering,
Data -Parks
fixing the tree guard and maintaining the plants for one year -9
Ornamental trees along the compound wall in side the park 1 x 21 21.00 Nos 1550.80 1 Nos

447524687.xlsx-Park-Banda Narender Reddy 1877


Page 1878 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
22 Based on Item No.3.c of HMDA (FSR), Pg.31- Hedge/shrub planting: Digging
the trench of size 15cm depth, refilling the trench with red soil including cost
of red soil and farmyard manure at 4:1 ratio internal transportation of plants
and planting the plants including the application of fertilizers and perticides Data -Parks
26
etc., (A 20 gms/pit/sqmt) complete but excluding the cost of the fertilizers @
as
20 per Drawing along
gms/pit/sqmt) the compound
and plant material wall 1 x 1 21 21.00 Rmt 264.72 1 Rmt
23 Planting Speciman plants including digging of pits 60cm. Cubes, loosening of
15cm. Bottom red soil, filling with soil with 10 kg Compost + 100 DAP per pit
staking gap filling with in two month after planting.
Golden bamboo 8” 1 x 4 4 Nos 1483.91 1 No
Fercaria 2” 1 x 4 4 Nos 2069.03 1 No
Ficus 4” (Verites). 1 x 3 3 Nos 1199.88 1 No
Bottle Bush 1 x 3 3 Nos 1313.49 1 No
Sub- Total for Greenary - C
D Children Play Area
24 BLD-CSTN-2-1 (9) : Earth work excavation for foundations and depositing on
bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308). Data- Bld -
3
for foundations of Slide and Ladder 0 x 3 0.60 0.60 0.75 0.00
for foundations of Swing Two seater 0 x 2 0.60 0.60 0.75 0.00
for foundations of Spiral Swing 0 x 1 0.75 0.75 0.75 0.00
for foundations of Sea-Saw 4 seater 1 x 1 0.75 0.75 0.75 0.42
for foundations of Merry go round 1 x 1 0.75 0.75 0.90 0.51
for Idle Park bench 6 x 4 0.45 0.45 0.45 2.19
for filling Sand 1 x 1 21.50 14.10 0.30 90.95
94.07 Cum 210.92 1 Cum
25 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating
each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310)

Filling sand - Children play area 1 x 1 21.5 14.10 0.30 90.95 Cum 910.40 1 Cum

447524687.xlsx-Park-Banda Narender Reddy 1878


Page 1879 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
26 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level :
Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate:
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work.for foundation and under flooring bed. Data- Bld -
15
for foundations of Slide and Ladder 0 x 3 0.60 0.60 0.75 0.00
for foundations of Swing Two seater 0 x 2 0.60 0.60 0.75 0.00
for foundations of Spiral Swing 0 x 1 0.75 0.75 0.75 0.00
for foundations of Sea-Saw 4 seater 1 x 1 0.75 0.75 0.75 0.42
for foundations of Merry go round 1 x 1 0.75 0.75 0.90 0.51
for Idle Park bench 6 x 4 0.45 0.45 0.45 2.19
3.12 Cum 3785.55 1 Cum
27 Providing Children play equipment of standard make including cost and
conveyance of all material and all labour charges, all operational and
incidental charges etc complete.
Slide and Ladder 8 feet 0 x 1 0 No 18083.00 1 No
Swing Two seater 0 x 1 0 No 15087.00 1 No
Spiral Swing 0 x 1 0 No 18618.00 1 No
Sea-Saw 4 seater 1 x 1 1 No 13482.00 1 No
Merry go round 1 x 2 2 No 17013.00 1 No
Providing seating area development by providing cast Iron /Cement seats
as directed by Engineer incharge etc, complete.
Idle Park bench 1 x 6 6 No 13418.00 1 No
Sub- Total for Children Play area - D
E Garden Posts with LED Lamps
28 ELEC-13.2.2 : Fabrication and Supply of M.S. Poles for garden posts with 'B' ele ssr-7-
class 6 mtrs long 60.25mm outer dia with base plate and suitable pole cap 10-1 d
including cost and conveyance of all material including fixing of luminaire and
labour charges etc., complete. 6Mtrs 'B' Class M.S. pipe of 60.25mm dia with
base plate and suitable pole cap
Along the Path ways as per requirement 1 x 2 2 Nos #REF! 1 each

447524687.xlsx-Park-Banda Narender Reddy 1879


Page 1880 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
29 Supply and fixing of 50mm dia 0.5 mtrs single arm M.S. pipe bracket with
sleeve and fasteners with necessary angle including painting etc., complete
on existing pole including fixing of luminaire.
1 x 2 2 Nos #REF! 1 each

447524687.xlsx-Park-Banda Narender Reddy 1880


Page 1881 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
30 13.4.6 : Erection charges for 6Mtrs. Long MS / GI Garden post including
excavation of pit, concreting 1:3:6 and painting including cost and
conveyance of all materials including fixing of luminaire and labour charges
etc., complete.
Along the Path ways as per requirement 1 x 2 2 Nos #REF! 1 each
31 Supply and fixing of 300mm x 180mm x 140mm No.16 gauge CRCA sheet
box with hinged door and locking arrangements and din channel for fixing
2Nos MCBs duly powder coated with matching colour of poles including
fixing with necessary arrangments etc., complete.
1 x 2 2 Nos #REF! 1 each
32 Supply and fixing of 6-32A 10KA DP MCB, C/D Curve ISI Mark of make
Legrand / Schneider.
1 x 2 2 Nos #REF! 1 each
33 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain
Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of Data- Bld -
work with nomonal reinforcement Pi r2 d 18
a for Coping of Lamp post above GL 1 x 2 3.14 0.04 0.45 0.11 Cum 5044.84 1 Cum

447524687.xlsx-Park-Banda Narender Reddy 1881


Page 1882 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
34 ELEC-3.11.1: Supply and transportation of ......... LED Street light Body ele ssr-3-9-
made of high grade pressure die – cast Aluminum alloy with corrosion 15
resistant powder coat, having protective toughened glass cover, Less Glare,
IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66)
protected, universal Voltage 100 - 270 V AC, P.F, ≥ 0.90, high power LED's
having efficacy ≥130 lumens/watt, and junction temperature < 75°C, with
Ingress protection IP66, Driver surge protection 4KV, with optics distribution
Type II medium, THD<10% at 110 Volts AC, driver efficiency ≥90%, CCT:
5600K, minimum CRI≥80, Inbuilt Electrical protections like Over voltage,
short circuit, Over load, Open Circuit, Miswiring, Intelligent pole mounting
option provides flexibility of vertical or horizontal pole mounting option
complete, with Top Openable Maintenance and Manufacture has to submit
LM79,LM80 & Photobiological Safety Report. Luminaire Performance
Complies to IS10322 (Part 5/Sec 3) & IEC 60598-1,IEC 60529 and ISO
certified company. LUMINAIRE MAKE : PHILIPS / OSRAM / GE /
CROMPTON / BAJAJ / SCHREDER / VIN / HALONIX / HAVELLS / HPL.
LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG /
LG LEDs.

Along the Path ways as per requirement 1 x 2 2.00 Nos #REF! 1 each
35 BLD-ELEC-3-1-4 : Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C.
insulated flexible copper cable in existing pipe for mains inlcuding all labour
charges etc., complete.
1 x 2 5.00 10.00 Rmt #REF! 1 Rmt
36 BLD-ELEC-3-1-2 : Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C.
insulated flexible copper cable in existing pipe for earth continuity including
all labour charges etc., complete.
1 x 2 5.00 10.00 Rmt #REF! 1 Rmt
37 ELEC-4.1.3 : Supply of 6 Sqmm 2 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part -
I) of Makes : Torrent / Universal / Unicab / Polycab / Havells / Gloster / KEI

Under ground Cable connecting all poles and extra for pole to panel 1 x 2 40.00 80.00 Rmt #REF! 1 Rmt
38 ELEC-4.1.5 : Supply of 10 Sqmm 4 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part -
I) of Makes : Torrent / Universal / Unicab / Polycab / Havells / Gloster / KEI.
from Panel to incomming 1 x 1 30.00 30.00 Rmt #REF! 1 Rmt

447524687.xlsx-Park-Banda Narender Reddy 1882


Page 1883 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
39 ELEC-15.6.1 : Earth work excavation of Trench in hard ground soil, laying of
U.G cables upto 50 Sq,mm on sand cushion covering the cable with bricks
and back filling of Trench duly providing route indicator embedded in C.C
including cost and conveyance of materials and labour charges etc.,
complete.
for under ground Cabling 1 x 2 30.00 60.00 Rmt #REF! 1 Rmt
40 Supply, Transportation, fabrication and erection of following guage CRCA
sheet steel enclosure for power control cubicle panel / boxes etc., including
cutting, bending drilling, welding and reveting etc., complete with cleaning
with 7 tank process and painting with powder coating including cost and
conveyance of all materials and labour charges.
1 No of 0.9m x 1.20m size Box 1 x 1 1.200 0.900 1.08 Sqm #REF! 1 Sqm
41 BLD-ELEC-4-1-3: Supply and erection of Panel mounting cubical type ( 100
to 250A ) TPN 415V, 50 Hz. switch disconnector fuse unit complete with front
drive mechanism with door inter lock, padlocking arrangement etc., complete
with fuse links on existing control panel.
1 x 1 1.00 Nos #REF! 1 each
42 BLD-ELEC-4-3-3: Supply and erection of Panel mounting 125A, 4 Pole,
25kA, MCCB with thermal magnetic setting / Microprocessor based release
arrangement with all connections etc., complete on existing panel.
1 x 1 1.00 Nos #REF! 1 each
43 ELEC-3.5.1: Supply of Automatic Street Light Control System with Optical
Sensor, Low volatage / High voltage trip and reset, operating voltage 150 -
280V AC, 50 HZ with suitable SMC enclousure of IP 54 protection, MCBs
and contactor suitable to control the load of 3 KW of single phase load with
necessary clamping arrangements. Makes : Swadeep Nature Switch / Light
Mate.
1 x 1 1.00 Nos #REF! 1 each
44 BLD-ELEC-5-1-1 : Providing independent earthling by excavating a trench to
a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm
dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume
pipe ring duly providing staggered holes including filling with equal
proportion of Salt and Charcoal in layers and all labour charges etc.,
complete for small quarters.

2 Nos for Poles + 2 Nos for Panels 1 x 4 4 Nos #REF! 1 Rmt


Sub- Total for Garden Post Electrification - E
Total of A+B+C+D

447524687.xlsx-Park-Banda Narender Reddy 1883


Page 1884 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
45 Water fall Type fountain: (FRP) location :to be located on the two supporting
stone masanry pillars for projected height of 20 feet & width 10 feet with MS
angle for load bearing and water turf (over head tank) to be fabricated in
stainless steel size 8 ft lenght x 3 ft width x 3 ft. height and duly connected
with flexible pipe/GI pipe from the bottom collection & commisioning etc,.
including all civil works etc,. complete.

Fountain 1 x 1 1 Nos 200000.00 1 Rmt


Total Rs.

447524687.xlsx-Park-Banda Narender Reddy 1884


Page 1885 of 2191

f Divider and central lighting


at Banda Narender Reddy Nagar
& ABSTRACT ESTIMATION

Amount

1687.00

1893.00

3861.00

447524687.xlsx-Park-Banda Narender Reddy 1885


Page 1886 of 2191

Amount

5393.00
3055.00

4887.00

10410.00

447524687.xlsx-Park-Banda Narender Reddy 1886


Page 1887 of 2191

Amount

8842.00

2623.00

1318.00

447524687.xlsx-Park-Banda Narender Reddy 1887


Page 1888 of 2191

Amount

7067.00

7925.00
58961.00

5580.94

447524687.xlsx-Park-Banda Narender Reddy 1888


Page 1889 of 2191

Amount

30914.00

9832.32

40247.82

61635.60
148210.68

447524687.xlsx-Park-Banda Narender Reddy 1889


Page 1890 of 2191

Amount

481.32

2449.13

80881.50

3928.82

32566.80

447524687.xlsx-Park-Banda Narender Reddy 1890


Page 1891 of 2191

Amount

5559.12

5935.64
8276.12
3599.64
3940.47
144688.11

19841.24

82800.88

447524687.xlsx-Park-Banda Narender Reddy 1891


Page 1892 of 2191

Amount

11810.92

0.00
0.00
0.00
13482.00
34026.00

80508.00
242469.04

#REF!

447524687.xlsx-Park-Banda Narender Reddy 1892


Page 1893 of 2191

Amount

#REF!

447524687.xlsx-Park-Banda Narender Reddy 1893


Page 1894 of 2191

Amount

#REF!

#REF!

#REF!

555.00

447524687.xlsx-Park-Banda Narender Reddy 1894


Page 1895 of 2191

Amount

#REF!

#REF!

#REF!

#REF!

#REF!

447524687.xlsx-Park-Banda Narender Reddy 1895


Page 1896 of 2191

Amount

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
#REF!
#REF!

447524687.xlsx-Park-Banda Narender Reddy 1896


Page 1897 of 2191

Amount

200000.00
#REF!

447524687.xlsx-Park-Banda Narender Reddy 1897


KODADA MUNICIPALITY

Development of Parks in Miryalaguda Municipality, Under Amrut

GENERAL ABSTRACT

S.No Description of Items Quantity

1 Construction of Park near Venkateshwara Temple at APHB Colony 1 No

Sub-Total. A Rs.

2 Add VAT @ 5%

3 Add Labour Cess @ 1%

4 Provision towards QC @ 1%

5 Provision towards seiniorage charges


Provision towards Consultancy charges for Preparation of DPRs @
6
1.5%
7 L.S for Unforseen items

Sub-Total. B Rs.

Total Project Cost ( A+B ) Rs.

Say Rs.
r Amrut

Amount in Rs.

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
Page 1900 of 2191

Construction of Divider and central lighting


Construction of Park at Chandragiri Villas
DETAILED & ABSTRACT ESTIMATION
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
A Compound Wall
Compound Wall Front side 1 x 1 10.00
Total length of the Compound Wall 10.00 0.60 0.60 3.60
for gate Pillars 1 x 2 1.40 1.40 1.50 5.88
Deduction for gate pillars -1 x 2 1.40 0.60 0.60 -1.01
8.47 Cum
1 BLD-CSTN-2-1 (9) : Earth work excavation for foundations and depositing on
bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308).

% of Total Qty 1 x 1 90% 8.00 Cum 210.92 1 Cum


2 BLD-CSTN-2-7 - (15) : Earth work excavation for foundations and depositing
on bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308).

% of Total Qty 1 x 1 10% 1.00 Cum 1893.14 1 Cum


3 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level:
Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate:
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work.for foundation and under flooring bed.

for Compound Wall 1 x 1 10.00 0.60 0.10 0.60


for gate Pillars 1 x 2 1.40 1.40 0.15 0.59
Deduction for gate pillars -1 x 2 1.40 0.60 0.10 -0.17
1.02 Cum 3785.55 1 Cum

447524687.xlsx-Park-Chandra giri villas 1900


Page 1901 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
4 BLD-CSTN-3-13- ( 30 ) - A- Nominal mix: RCC M- 20 Nominal mix
(Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS
456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and
its fabrication charges for finished item of work, but including centering and
shuttering charges for FOUNDATIONS, PLINTH, PEDESTALS

a Footings for Main Gate pillars 1 x 2 1.30 1.30 0.20 0.68 Cum 7930.76 1 Cum
b Pedastals for Gate pillars 1 x 2 0.45 0.45 0.90 0.36 Cum 8484.75 1 Cum
5 BLD-CSTN-3-13- ( 30 ) - B- Nominal mix: RCC M- 20 Nominal mix
(Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS
456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and
its fabrication charges for finished item of work, but including centering and
shuttering charges for COLUMNS, LINTELS, WATER TANKS, RCC WALLS
IN BUILDINGS - WOODEN SCAFFOLDING

for Gate pillars 1 x 2 0.30 0.30 2.70 0.49 Cum 9973.53 1 Cum
6 BLD-CSTN-6-12-(67) : Construction of RR Masonary in Cement Mortor
( 1:8 ) Prop using hard granite stone including cost & Conveyance of all
materials like Cement, Sand , Water, Granite Stones, including Seigniorage
Charges on all Materials, ,labour charges for cutting Stones to required size
and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges
curing etc., complete for finished item of Work .

For Foundations below GL


for Compound Wall 1 x 1 10.00 0.60 0.50 3.00
3.00 Cum 3470.13 1 Cum

447524687.xlsx-Park-Chandra giri villas 1901


Page 1902 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
7 BLD-CSTN-6-5-(60) : Construction of CRS Masonary 1st Sort in Cement
Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of
all materials like Cement, Sand , Water, Granite Stones, labour charges for
cutting Stones to required size and shape, mixing of Cement Mortor,
Construction, Scaffolding Charges curing etc., complete for finished item of
Work .
Compound Wall Front side excluding gate 1 x 1 6.00 0.45 0.60 1.62
for pillars for fixing MS grills in front side at every 3.00m C/C 1 x 3 0.45 0.45 1.50 0.91
Deduction for CRS pillars from wall -1 x 3 0.45 0.45 0.60 -0.36
Net Qty 2.17 Cum 4074.46 1 Cum
8 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level
Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work with nomonal reinforcement

Over CRS Walls in front side for fixing the Grills (0.15+0.2)/2 2 x 2 3.00 0.225 0.175 0.47
Over CRS Pillars in front side 1 x 3 0.45 0.45 0.075 0.05
0.52 Cum 5044.84 1 Cum
9 BLD-CSTN-7-1-(72) : Providing flush Cement Pointing to CRS Masonary in
Cement Mortor (1:3) Prop . for including cost & conveyance of all materials
to site , seignaiorage charges on all materials, labour charges on all
materials, curing etc., Complete for finished item of work
Both sides of CRS walls
Compound Wall Front side excluding gate 1 x 2 6.00 0.60 7.20
for pillars for fixing MS grills in front side at every 3.00m C/C 3 x 4 0.45 1.50 8.10
15.30 Sqm 86.17 1 Sqm

447524687.xlsx-Park-Chandra giri villas 1902


Page 1903 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
10 BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/
Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe
500 grade as per IS 1786-1979) of different diameters for RCC works ,
including labour charges for straightening, cutting, bending to required sizes
and shapes, placing in position with cover blocks of approved materials and
size and tying and lap-splicing with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and drawings, including cost
and conveyance of steel bars, including all wastages such as overlaps,
couplings, chairs, spacer bars including cost and conveyance of binding
wire, cover blocks and all incidental, operational, labour charges such as
cutting, bending, placing in position, tying including sales and other taxes on
all materials etc., complete for finished item of work in all floors.( APSS
No.126
For Footing & Pedastals 1.04 Cum 40.00 Kg/Cum 41.60
For Columns 0.49 Cum 125.00 Kg/Cum 61.25
102.85 Kg 68.71 1 Kg
11 Supplying and fixing of MS Grills as per Drawings including fixing with 4 Nos
of MS Z holdfasts (2 on each side) duly making cutting masonry, fixing and
making to original surface neatly and painting gate with one coat of red oxide
primer including cost and conveyance of all materials,Locking arrangment,
Ornamental pieces etc ,cutting, bending, welding including all operational
charges and all labour charges etc., complete for finished item of work.

MS Grills for compound wall @ 45 Kg/each ( 2.5 x1.35m) 1 x 2 45.00 Kg/each 90.00 Kg 88.05 1 Kg
Sub- Total for Compound wall - A
B Path ways
12 BLD-CSTN-2-1 (9): Earth work excavation and depositing on bank for all lifts
and with an initial lead of 10m including all operational, incidental, labour
charges such as shoring ,sheeting, planking, strutting, etc. complete for
finished item of work including seigniorage excluding dewatering charges etc
as per SS - 20 B (APSS 308). Data- Bld -
3
a For Walking Track/ Path ways
Length of path ways-
for sectioning and levelling the ground for Pathways 1 x 1 185.00 2.00 0.200 74.00
for kerbing walls on both sides of the path ways 1 x 2 185.00 0.30 0.150 16.65
Total Qty 90.65 Cum 210.92 1 Cum

447524687.xlsx-Park-Chandra giri villas 1903


Page 1904 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
13 RBR-TSRA-29 : Cast in Situ Cement Concrete M20 Kerb: Construction of
cement concrete kerb with top and bottom width 115 and 165 mm
respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150
mm thick, foundation having 50 mm projection beyond kerb stone, kerb
stone laid with kerb laying machine, foundation concrete laid manually, all
complete as per clause 408 MORTH data-
parks-22
for Kerbing of Pathways 1 x 2 185.00 370.00
370.00 Rmt 286.24 1 Rmt
14 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating
each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310) Data- Bld -
10
For levelling the track between walls 1 x 1 185.00 2.00 0.100 37.00
37.00 Cum 910.40 1 Cum
15 BLD-CSTN-3-6 ( 23 ) -Hand mixing up to Plinth Level : Plain Cement
concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse
aggregate ) using 40mm size Hard Granite Machine Crushed Metal including
cost and conveyance of all materials like cement, sand, coarse aggregate
water etc., to site , seigniorage charges on all materials, labour charges ,
for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface
to the required level curing etc., complete for finished item of work.for
foundation and under flooring bed. Data- Bld -
15
a For levelling the walking track between walls 1 x 1 185.00 2.00 0.100 37.00
Total Qty 37.00 Cum 3726.65 1 Cum
16 RBR-CCPV-13 - ii: Providing and Laying of Interlocking Concrete Block
Pavements using PHOENIX or equivalent high strength Cement Concrete
interlocking Regular Pavers of 50 mm thickness of M- 40 Grade of which top
12 mm thick shall be for colour pigmentation with imported colours and
white cement to get required reflective glazing inclusive of all taxes - as per
drawing and Technical Specification Clause 1504 MORD Data- Bld -
124
a For Walking Track/ Path ways 1 x 1 185.00 2.00 370.00
Total Qty 370.00 Sqm 570.70 1 Sqm
Sub- Total for Path ways -B
C Greenary & Play Area

447524687.xlsx-Park-Chandra giri villas 1904


Page 1905 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
17 RBR-STCL-2 : Clearing and grubbing road land including uprooting wild
vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm,
removal of stumps of such trees cut earlier and disposal of unserviceable
materials and stacking of serviceable material to be used or auctioned, upto
a lead of 1000 m including removal and disposal of top organic soil not
exceeding 150 mm in thickness as per Technical Specification Clause 201
MORD / MORTH.

for clearing the site ( Area as o\per Drawing) 1 x 1 1753.00 1753.0 Sqm 22.92 10 Sqm
18 RBR-EECD-5 : ii: Excavation for roadway in soil by mechanical means
including cutting and pushing the earth to site of embankment upto a
distance of 100 m, including trimming bottom and side slopes in accordance
with requirements of lines, grades and cross-sections as per Technical
Specification Clause 302.3 MORD / 301 MORTH.
1 x 1 1753.00 0.250 438.25 Cum 46.65 1 Cum
19 Based on Item No.2 of HMDA (FSR), Pg.31 - FISCUE / SHADE GRASS
(Dibbling) : Making lawns by Dressing the surface to the desired shape,
laying 6" layer of fine red soil, covered with a thin layer of sand watering,
rolling with hand roller (4" thckness after rolling), including the cost of red
earth, sand and labour charges and the cost of fertlizers, chemical and grass
etc,. complete as per standard practice. Data -Parks
- 22
Area as per Drawing 1 x 1 1753.00
1753.00 Sqm 385.15 1 Sqm
20 Based on Item No.6.a of HMDA (FSR), Pg.31 -Ground Covers : Bed
preparation 6" layer of soil mixture 3:1:1 ratio red soil, farmyard manure and
river sand and application of fertolizers (@ 20 gms/pit/sqmt), smooth surface
as per design including cost of soil mixture, filling of the soil mixture and
internal transportation. Data -Parks
-8
Area as per Drawing 1 x 1 117.00 117.0
117.00 Rmt 280.63 1 Rmt
21 RBR-HRTC-9: Planting of trees by the road side (Avenue trees) in 0.60 m dia
holes, 1 m deep dug in the ground, mixing the soil with decayed farm
yard/sludge manure, planting the saplings, backfilling the trench, watering,
Data -Parks
fixing the tree guard and maintaining the plants for one year -9
Ornamental trees along the compound wall in side the park 1 x 63 63.00 Nos 1550.80 1 Nos

447524687.xlsx-Park-Chandra giri villas 1905


Page 1906 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
22 Based on Item No.3.c of HMDA (FSR), Pg.31- Hedge/shrub planting: Digging
the trench of size 15cm depth, refilling the trench with red soil including cost
of red soil and farmyard manure at 4:1 ratio internal transportation of plants
and planting the plants including the application of fertilizers and perticides Data -Parks
26
etc., (A 20 gms/pit/sqmt) complete but excluding the cost of the fertilizers @
as
20 per Drawing along
gms/pit/sqmt) the compound
and plant material wall 1 x 1 63 63.00 Rmt 264.72 1 Rmt
23 Planting Speciman plants including digging of pits 60cm. Cubes, loosening of
15cm. Bottom red soil, filling with soil with 10 kg Compost + 100 DAP per pit
staking gap filling with in two month after planting.
Golden bamboo 8” 1 x 4 4 Nos 1483.91 1 No
Fercaria 2” 1 x 4 4 Nos 2069.03 1 No
Ficus 4” (Verites). 1 x 3 3 Nos 1199.88 1 No
Bottle Bush 1 x 3 3 Nos 1313.49 1 No
Sub- Total for Greenary - C
D Children Play Area
24 BLD-CSTN-2-1 (9) : Earth work excavation for foundations and depositing on
bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308). Data- Bld -
3
for foundations of Slide and Ladder 1 x 3 0.60 0.60 0.75 0.81
for foundations of Swing Two seater 1 x 2 0.60 0.60 0.75 0.54
for foundations of Spiral Swing 1 x 1 0.75 0.75 0.75 0.42
for foundations of Sea-Saw 4 seater 1 x 1 0.75 0.75 0.75 0.42
for foundations of Merry go round 1 x 1 0.75 0.75 0.90 0.51
for Idle Park bench 6 x 4 0.45 0.45 0.45 2.19
for filling Sand 1 x 1 21.50 14.10 0.30 90.95
95.84 Cum 210.92 1 Cum
25 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating
each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310)

Filling sand - Children play area 1 x 1 21.5 14.10 0.30 90.95 Cum 910.40 1 Cum

447524687.xlsx-Park-Chandra giri villas 1906


Page 1907 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
26 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level :
Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate:
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work.for foundation and under flooring bed. Data- Bld -
15
for foundations of Slide and Ladder 1 x 3 0.60 0.60 0.75 0.81
for foundations of Swing Two seater 1 x 2 0.60 0.60 0.75 0.54
for foundations of Spiral Swing 1 x 1 0.75 0.75 0.75 0.42
for foundations of Sea-Saw 4 seater 1 x 1 0.75 0.75 0.75 0.42
for foundations of Merry go round 1 x 1 0.75 0.75 0.90 0.51
for Idle Park bench 6 x 4 0.45 0.45 0.45 2.19
4.89 Cum 3785.55 1 Cum
27 Providing Children play equipment of standard make including cost and
conveyance of all material and all labour charges, all operational and
incidental charges etc complete.
Slide and Ladder 8 feet 1 x 1 1 No 18083.00 1 No
Swing Two seater 1 x 1 1 No 15087.00 1 No
Spiral Swing 1 x 1 1 No 18618.00 1 No
Sea-Saw 4 seater 1 x 1 1 No 13482.00 1 No
Merry go round 1 x 2 2 No 17013.00 1 No
Providing seating area development by providing cast Iron /Cement seats
as directed by Engineer incharge etc, complete.
Idle Park bench 1 x 6 6 No 13418.00 1 No
Sub- Total for Children Play area - D
E Garden Posts with LED Lamps
28 ELEC-13.2.2 : Fabrication and Supply of M.S. Poles for garden posts with 'B' ele ssr-7-
class 6 mtrs long 60.25mm outer dia with base plate and suitable pole cap 10-1 d
including cost and conveyance of all material including fixing of luminaire and
labour charges etc., complete. 6Mtrs 'B' Class M.S. pipe of 60.25mm dia with
base plate and suitable pole cap
Along the Path ways as per requirement 1 x 6 6 Nos #REF! 1 each

447524687.xlsx-Park-Chandra giri villas 1907


Page 1908 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
29 Supply and fixing of 50mm dia 0.5 mtrs single arm M.S. pipe bracket with
sleeve and fasteners with necessary angle including painting etc., complete
on existing pole including fixing of luminaire.
1 x 6 6 Nos #REF! 1 each

447524687.xlsx-Park-Chandra giri villas 1908


Page 1909 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
30 13.4.6 : Erection charges for 6Mtrs. Long MS / GI Garden post including
excavation of pit, concreting 1:3:6 and painting including cost and
conveyance of all materials including fixing of luminaire and labour charges
etc., complete.
Along the Path ways as per requirement 1 x 6 6 Nos #REF! 1 each
31 Supply and fixing of 300mm x 180mm x 140mm No.16 gauge CRCA sheet
box with hinged door and locking arrangements and din channel for fixing
2Nos MCBs duly powder coated with matching colour of poles including
fixing with necessary arrangments etc., complete.
1 x 6 6 Nos #REF! 1 each
32 Supply and fixing of 6-32A 10KA DP MCB, C/D Curve ISI Mark of make
Legrand / Schneider.
1 x 6 6 Nos #REF! 1 each
33 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain
Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of Data- Bld -
work with nomonal reinforcement Pi r2 d 18
a for Coping of Lamp post above GL 1 x 6 3.14 0.04 0.45 0.34 Cum 5044.84 1 Cum

447524687.xlsx-Park-Chandra giri villas 1909


Page 1910 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
34 ELEC-3.11.1: Supply and transportation of ......... LED Street light Body ele ssr-3-9-
made of high grade pressure die – cast Aluminum alloy with corrosion 15
resistant powder coat, having protective toughened glass cover, Less Glare,
IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66)
protected, universal Voltage 100 - 270 V AC, P.F, ≥ 0.90, high power LED's
having efficacy ≥130 lumens/watt, and junction temperature < 75°C, with
Ingress protection IP66, Driver surge protection 4KV, with optics distribution
Type II medium, THD<10% at 110 Volts AC, driver efficiency ≥90%, CCT:
5600K, minimum CRI≥80, Inbuilt Electrical protections like Over voltage,
short circuit, Over load, Open Circuit, Miswiring, Intelligent pole mounting
option provides flexibility of vertical or horizontal pole mounting option
complete, with Top Openable Maintenance and Manufacture has to submit
LM79,LM80 & Photobiological Safety Report. Luminaire Performance
Complies to IS10322 (Part 5/Sec 3) & IEC 60598-1,IEC 60529 and ISO
certified company. LUMINAIRE MAKE : PHILIPS / OSRAM / GE /
CROMPTON / BAJAJ / SCHREDER / VIN / HALONIX / HAVELLS / HPL.
LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG /
LG LEDs.

Along the Path ways as per requirement 1 x 6 6.00 Nos #REF! 1 each
35 BLD-ELEC-3-1-4 : Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C.
insulated flexible copper cable in existing pipe for mains inlcuding all labour
charges etc., complete.
1 x 6 5.00 30.00 Rmt #REF! 1 Rmt
36 BLD-ELEC-3-1-2 : Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C.
insulated flexible copper cable in existing pipe for earth continuity including
all labour charges etc., complete.
1 x 6 5.00 30.00 Rmt #REF! 1 Rmt
37 ELEC-4.1.3 : Supply of 6 Sqmm 2 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part -
I) of Makes : Torrent / Universal / Unicab / Polycab / Havells / Gloster / KEI

Under ground Cable connecting all poles and extra for pole to panel 1 x 6 40.00 240.00 Rmt #REF! 1 Rmt
38 ELEC-4.1.5 : Supply of 10 Sqmm 4 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part -
I) of Makes : Torrent / Universal / Unicab / Polycab / Havells / Gloster / KEI.
from Panel to incomming 1 x 1 30.00 30.00 Rmt #REF! 1 Rmt

447524687.xlsx-Park-Chandra giri villas 1910


Page 1911 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
39 ELEC-15.6.1 : Earth work excavation of Trench in hard ground soil, laying of
U.G cables upto 50 Sq,mm on sand cushion covering the cable with bricks
and back filling of Trench duly providing route indicator embedded in C.C
including cost and conveyance of materials and labour charges etc.,
complete.
for under ground Cabling 1 x 6 30.00 180.00 Rmt #REF! 1 Rmt
40 Supply, Transportation, fabrication and erection of following guage CRCA
sheet steel enclosure for power control cubicle panel / boxes etc., including
cutting, bending drilling, welding and reveting etc., complete with cleaning
with 7 tank process and painting with powder coating including cost and
conveyance of all materials and labour charges.
1 No of 0.9m x 1.20m size Box 1 x 1 1.200 0.900 1.08 Sqm #REF! 1 Sqm
41 BLD-ELEC-4-1-3: Supply and erection of Panel mounting cubical type ( 100
to 250A ) TPN 415V, 50 Hz. switch disconnector fuse unit complete with front
drive mechanism with door inter lock, padlocking arrangement etc., complete
with fuse links on existing control panel.
1 x 1 1.00 Nos #REF! 1 each
42 BLD-ELEC-4-3-3: Supply and erection of Panel mounting 125A, 4 Pole,
25kA, MCCB with thermal magnetic setting / Microprocessor based release
arrangement with all connections etc., complete on existing panel.
1 x 1 1.00 Nos #REF! 1 each
43 ELEC-3.5.1: Supply of Automatic Street Light Control System with Optical
Sensor, Low volatage / High voltage trip and reset, operating voltage 150 -
280V AC, 50 HZ with suitable SMC enclousure of IP 54 protection, MCBs
and contactor suitable to control the load of 3 KW of single phase load with
necessary clamping arrangements. Makes : Swadeep Nature Switch / Light
Mate.
1 x 1 1.00 Nos #REF! 1 each
44 BLD-ELEC-5-1-1 : Providing independent earthling by excavating a trench to
a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm
dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume
pipe ring duly providing staggered holes including filling with equal
proportion of Salt and Charcoal in layers and all labour charges etc.,
complete for small quarters.

2 Nos for Poles + 2 Nos for Panels 1 x 4 4 Nos #REF! 1 Rmt


Sub- Total for Garden Post Electrification - E
Total of A+B+C+D

447524687.xlsx-Park-Chandra giri villas 1911


Page 1912 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
45 Water fall Type fountain: (FRP) location :to be located on the two supporting
stone masanry pillars for projected height of 20 feet & width 10 feet with MS
angle for load bearing and water turf (over head tank) to be fabricated in
stainless steel size 8 ft lenght x 3 ft width x 3 ft. height and duly connected
with flexible pipe/GI pipe from the bottom collection & commisioning etc,.
including all civil works etc,. complete.

Fountain 1 x 1 1 Nos 200000.00 1 Rmt


Total Rs.

447524687.xlsx-Park-Chandra giri villas 1912


Page 1913 of 2191

f Divider and central lighting


f Park at Chandragiri Villas
& ABSTRACT ESTIMATION

Amount

1687.00

1893.00

3861.00

447524687.xlsx-Park-Chandra giri villas 1913


Page 1914 of 2191

Amount

5393.00
3055.00

4887.00

10410.00

447524687.xlsx-Park-Chandra giri villas 1914


Page 1915 of 2191

Amount

8842.00

2623.00

1318.00

447524687.xlsx-Park-Chandra giri villas 1915


Page 1916 of 2191

Amount

7067.00

7925.00
58961.00

19119.90

447524687.xlsx-Park-Chandra giri villas 1916


Page 1917 of 2191

Amount

105909.00

33684.80

137886.05

211159.00
507758.75

447524687.xlsx-Park-Chandra giri villas 1917


Page 1918 of 2191

Amount

4017.88

20444.36

675167.95

32833.71

97700.40

447524687.xlsx-Park-Chandra giri villas 1918


Page 1919 of 2191

Amount

16677.36

5935.64
8276.12
3599.64
3940.47
844131.29

20214.57

82800.88

447524687.xlsx-Park-Chandra giri villas 1919


Page 1920 of 2191

Amount

18511.34

18083.00
15087.00
18618.00
13482.00
34026.00

80508.00
301330.79

#REF!

447524687.xlsx-Park-Chandra giri villas 1920


Page 1921 of 2191

Amount

#REF!

447524687.xlsx-Park-Chandra giri villas 1921


Page 1922 of 2191

Amount

#REF!

#REF!

#REF!

1715.00

447524687.xlsx-Park-Chandra giri villas 1922


Page 1923 of 2191

Amount

#REF!

#REF!

#REF!

#REF!

#REF!

447524687.xlsx-Park-Chandra giri villas 1923


Page 1924 of 2191

Amount

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
#REF!
#REF!

447524687.xlsx-Park-Chandra giri villas 1924


Page 1925 of 2191

Amount

200000.00
#REF!

447524687.xlsx-Park-Chandra giri villas 1925


KODADA MUNICIPALITY

Development of Parks in Miryalaguda Municipality, Under Amrut

GENERAL ABSTRACT

S.No Description of Items Quantity

1 Construction of Park near Venkateshwara Temple at APHB Colony 1 No

Sub-Total. A Rs.

2 Add VAT @ 5%

3 Add Labour Cess @ 1%

4 Provision towards QC @ 1%

5 Provision towards seiniorage charges


Provision towards Consultancy charges for Preparation of DPRs @
6
1.5%
7 L.S for Unforseen items

Sub-Total. B Rs.

Total Project Cost ( A+B ) Rs.

Say Rs.
r Amrut

Amount in Rs.

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
Page 1928 of 2191

Construction of Divider and central lighting


Construction of Park at Venkateshwara Colony
DETAILED & ABSTRACT ESTIMATION
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
A Compound Wall
Compound Wall Front side 1 x 1 10.00
Total length of the Compound Wall 10.00 0.60 0.60 3.60
for gate Pillars 1 x 2 1.40 1.40 1.50 5.88
Deduction for gate pillars -1 x 2 1.40 0.60 0.60 -1.01
8.47 Cum
1 BLD-CSTN-2-1 (9) : Earth work excavation for foundations and depositing on
bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308).

% of Total Qty 1 x 1 90% 8.00 Cum 210.92 1 Cum


2 BLD-CSTN-2-7 - (15) : Earth work excavation for foundations and depositing
on bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308).

% of Total Qty 1 x 1 10% 1.00 Cum 1893.14 1 Cum


3 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level:
Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate:
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work.for foundation and under flooring bed.

for Compound Wall 1 x 1 10.00 0.60 0.10 0.60


for gate Pillars 1 x 2 1.40 1.40 0.15 0.59
Deduction for gate pillars -1 x 2 1.40 0.60 0.10 -0.17
1.02 Cum 3785.55 1 Cum

447524687.xlsx-Park-Venkateshwara colony 1928


Page 1929 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
4 BLD-CSTN-3-13- ( 30 ) - A- Nominal mix: RCC M- 20 Nominal mix
(Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS
456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and
its fabrication charges for finished item of work, but including centering and
shuttering charges for FOUNDATIONS, PLINTH, PEDESTALS

a Footings for Main Gate pillars 1 x 2 1.30 1.30 0.20 0.68 Cum 7930.76 1 Cum
b Pedastals for Gate pillars 1 x 2 0.45 0.45 0.90 0.36 Cum 8484.75 1 Cum
5 BLD-CSTN-3-13- ( 30 ) - B- Nominal mix: RCC M- 20 Nominal mix
(Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS
456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and
its fabrication charges for finished item of work, but including centering and
shuttering charges for COLUMNS, LINTELS, WATER TANKS, RCC WALLS
IN BUILDINGS - WOODEN SCAFFOLDING

for Gate pillars 1 x 2 0.30 0.30 2.70 0.49 Cum 9973.53 1 Cum
6 BLD-CSTN-6-12-(67) : Construction of RR Masonary in Cement Mortor
( 1:8 ) Prop using hard granite stone including cost & Conveyance of all
materials like Cement, Sand , Water, Granite Stones, including Seigniorage
Charges on all Materials, ,labour charges for cutting Stones to required size
and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges
curing etc., complete for finished item of Work .

For Foundations below GL


for Compound Wall 1 x 1 10.00 0.60 0.50 3.00
3.00 Cum 3470.13 1 Cum

447524687.xlsx-Park-Venkateshwara colony 1929


Page 1930 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
7 BLD-CSTN-6-5-(60) : Construction of CRS Masonary 1st Sort in Cement
Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of
all materials like Cement, Sand , Water, Granite Stones, labour charges for
cutting Stones to required size and shape, mixing of Cement Mortor,
Construction, Scaffolding Charges curing etc., complete for finished item of
Work .
Compound Wall Front side excluding gate 1 x 1 6.00 0.45 0.60 1.62
for pillars for fixing MS grills in front side at every 3.00m C/C 1 x 3 0.45 0.45 1.50 0.91
Deduction for CRS pillars from wall -1 x 3 0.45 0.45 0.60 -0.36
Net Qty 2.17 Cum 4074.46 1 Cum
8 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level
Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work with nomonal reinforcement

Over CRS Walls in front side for fixing the Grills (0.15+0.2)/2 2 x 2 3.00 0.225 0.175 0.47
Over CRS Pillars in front side 1 x 3 0.45 0.45 0.075 0.05
0.52 Cum 5044.84 1 Cum
9 BLD-CSTN-7-1-(72) : Providing flush Cement Pointing to CRS Masonary in
Cement Mortor (1:3) Prop . for including cost & conveyance of all materials
to site , seignaiorage charges on all materials, labour charges on all
materials, curing etc., Complete for finished item of work
Both sides of CRS walls
Compound Wall Front side excluding gate 1 x 2 6.00 0.60 7.20
for pillars for fixing MS grills in front side at every 3.00m C/C 3 x 4 0.45 1.50 8.10
15.30 Sqm 86.17 1 Sqm

447524687.xlsx-Park-Venkateshwara colony 1930


Page 1931 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
10 BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/
Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe
500 grade as per IS 1786-1979) of different diameters for RCC works ,
including labour charges for straightening, cutting, bending to required sizes
and shapes, placing in position with cover blocks of approved materials and
size and tying and lap-splicing with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and drawings, including cost
and conveyance of steel bars, including all wastages such as overlaps,
couplings, chairs, spacer bars including cost and conveyance of binding
wire, cover blocks and all incidental, operational, labour charges such as
cutting, bending, placing in position, tying including sales and other taxes on
all materials etc., complete for finished item of work in all floors.( APSS
No.126
For Footing & Pedastals 1.04 Cum 40.00 Kg/Cum 41.60
For Columns 0.49 Cum 125.00 Kg/Cum 61.25
102.85 Kg 68.71 1 Kg
11 Supplying and fixing of MS Grills as per Drawings including fixing with 4 Nos
of MS Z holdfasts (2 on each side) duly making cutting masonry, fixing and
making to original surface neatly and painting gate with one coat of red oxide
primer including cost and conveyance of all materials,Locking arrangment,
Ornamental pieces etc ,cutting, bending, welding including all operational
charges and all labour charges etc., complete for finished item of work.

MS Grills for compound wall @ 45 Kg/each ( 2.5 x1.35m) 1 x 2 45.00 Kg/each 90.00 Kg 88.05 1 Kg
Sub- Total for Compound wall - A
B Path ways
12 BLD-CSTN-2-1 (9): Earth work excavation and depositing on bank for all lifts
and with an initial lead of 10m including all operational, incidental, labour
charges such as shoring ,sheeting, planking, strutting, etc. complete for
finished item of work including seigniorage excluding dewatering charges etc
as per SS - 20 B (APSS 308). Data- Bld -
3
a For Walking Track/ Path ways
Length of path ways-
for sectioning and levelling the ground for Pathways 1 x 1 330.00 2.00 0.200 132.00
for kerbing walls on both sides of the path ways 1 x 2 330.00 0.30 0.150 29.70
Total Qty 161.70 Cum 210.92 1 Cum

447524687.xlsx-Park-Venkateshwara colony 1931


Page 1932 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
13 RBR-TSRA-29 : Cast in Situ Cement Concrete M20 Kerb: Construction of
cement concrete kerb with top and bottom width 115 and 165 mm
respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150
mm thick, foundation having 50 mm projection beyond kerb stone, kerb
stone laid with kerb laying machine, foundation concrete laid manually, all
complete as per clause 408 MORTH data-
parks-22
for Kerbing of Pathways 1 x 2 330.00 660.00
660.00 Rmt 286.24 1 Rmt
14 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating
each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310) Data- Bld -
10
For levelling the track between walls 1 x 1 330.00 2.00 0.100 66.00
66.00 Cum 910.40 1 Cum
15 BLD-CSTN-3-6 ( 23 ) -Hand mixing up to Plinth Level : Plain Cement
concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse
aggregate ) using 40mm size Hard Granite Machine Crushed Metal including
cost and conveyance of all materials like cement, sand, coarse aggregate
water etc., to site , seigniorage charges on all materials, labour charges ,
for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface
to the required level curing etc., complete for finished item of work.for
foundation and under flooring bed. Data- Bld -
15
a For levelling the walking track between walls 1 x 1 330.00 2.00 0.100 66.00
Total Qty 66.00 Cum 3726.65 1 Cum
16 RBR-CCPV-13 - ii: Providing and Laying of Interlocking Concrete Block
Pavements using PHOENIX or equivalent high strength Cement Concrete
interlocking Regular Pavers of 50 mm thickness of M- 40 Grade of which top
12 mm thick shall be for colour pigmentation with imported colours and
white cement to get required reflective glazing inclusive of all taxes - as per
drawing and Technical Specification Clause 1504 MORD Data- Bld -
124
a For Walking Track/ Path ways 1 x 1 330.00 2.00 660.00
Total Qty 660.00 Sqm 570.70 1 Sqm
Sub- Total for Path ways -B
C Greenary & Play Area

447524687.xlsx-Park-Venkateshwara colony 1932


Page 1933 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
17 RBR-STCL-2 : Clearing and grubbing road land including uprooting wild
vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm,
removal of stumps of such trees cut earlier and disposal of unserviceable
materials and stacking of serviceable material to be used or auctioned, upto
a lead of 1000 m including removal and disposal of top organic soil not
exceeding 150 mm in thickness as per Technical Specification Clause 201
MORD / MORTH.

for clearing the site ( Area as o\per Drawing) 1 x 1 930.00 930.0 Sqm 22.92 10 Sqm
18 RBR-EECD-5 : ii: Excavation for roadway in soil by mechanical means
including cutting and pushing the earth to site of embankment upto a
distance of 100 m, including trimming bottom and side slopes in accordance
with requirements of lines, grades and cross-sections as per Technical
Specification Clause 302.3 MORD / 301 MORTH.
1 x 1 930.00 0.250 232.50 Cum 46.65 1 Cum
19 Based on Item No.2 of HMDA (FSR), Pg.31 - FISCUE / SHADE GRASS
(Dibbling) : Making lawns by Dressing the surface to the desired shape,
laying 6" layer of fine red soil, covered with a thin layer of sand watering,
rolling with hand roller (4" thckness after rolling), including the cost of red
earth, sand and labour charges and the cost of fertlizers, chemical and grass
etc,. complete as per standard practice. Data -Parks
- 22
Area as per Drawing 1 x 1 930.00
930.00 Sqm 385.15 1 Sqm
20 Based on Item No.6.a of HMDA (FSR), Pg.31 -Ground Covers : Bed
preparation 6" layer of soil mixture 3:1:1 ratio red soil, farmyard manure and
river sand and application of fertolizers (@ 20 gms/pit/sqmt), smooth surface
as per design including cost of soil mixture, filling of the soil mixture and
internal transportation. Data -Parks
-8
Area as per Drawing 1 x 1 62.00 62.0
62.00 Rmt 280.63 1 Rmt
21 RBR-HRTC-9: Planting of trees by the road side (Avenue trees) in 0.60 m dia
holes, 1 m deep dug in the ground, mixing the soil with decayed farm
yard/sludge manure, planting the saplings, backfilling the trench, watering,
Data -Parks
fixing the tree guard and maintaining the plants for one year -9
Ornamental trees along the compound wall in side the park 1 x 45 45.00 Nos 1550.80 1 Nos

447524687.xlsx-Park-Venkateshwara colony 1933


Page 1934 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
22 Based on Item No.3.c of HMDA (FSR), Pg.31- Hedge/shrub planting: Digging
the trench of size 15cm depth, refilling the trench with red soil including cost
of red soil and farmyard manure at 4:1 ratio internal transportation of plants
and planting the plants including the application of fertilizers and perticides Data -Parks
26
etc., (A 20 gms/pit/sqmt) complete but excluding the cost of the fertilizers @
as
20 per Drawing along
gms/pit/sqmt) the compound
and plant material wall 1 x 1 45 45.00 Rmt 264.72 1 Rmt
23 Planting Speciman plants including digging of pits 60cm. Cubes, loosening of
15cm. Bottom red soil, filling with soil with 10 kg Compost + 100 DAP per pit
staking gap filling with in two month after planting.
Golden bamboo 8” 1 x 4 4 Nos 1483.91 1 No
Fercaria 2” 1 x 4 4 Nos 2069.03 1 No
Ficus 4” (Verites). 1 x 3 3 Nos 1199.88 1 No
Bottle Bush 1 x 3 3 Nos 1313.49 1 No
Sub- Total for Greenary - C
D Children Play Area
24 BLD-CSTN-2-1 (9) : Earth work excavation for foundations and depositing on
bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308). Data- Bld -
3
for foundations of Slide and Ladder 1 x 3 0.60 0.60 0.75 0.81
for foundations of Swing Two seater 1 x 2 0.60 0.60 0.75 0.54
for foundations of Spiral Swing 1 x 1 0.75 0.75 0.75 0.42
for foundations of Sea-Saw 4 seater 1 x 1 0.75 0.75 0.75 0.42
for foundations of Merry go round 1 x 1 0.75 0.75 0.90 0.51
for Idle Park bench 6 x 4 0.45 0.45 0.45 2.19
for filling Sand 1 x 1 21.50 14.10 0.30 90.95
95.84 Cum 210.92 1 Cum
25 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating
each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310)

Filling sand - Children play area 1 x 1 21.5 14.10 0.30 90.95 Cum 910.40 1 Cum

447524687.xlsx-Park-Venkateshwara colony 1934


Page 1935 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
26 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level :
Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate:
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work.for foundation and under flooring bed. Data- Bld -
15
for foundations of Slide and Ladder 1 x 3 0.60 0.60 0.75 0.81
for foundations of Swing Two seater 1 x 2 0.60 0.60 0.75 0.54
for foundations of Spiral Swing 1 x 1 0.75 0.75 0.75 0.42
for foundations of Sea-Saw 4 seater 1 x 1 0.75 0.75 0.75 0.42
for foundations of Merry go round 1 x 1 0.75 0.75 0.90 0.51
for Idle Park bench 6 x 4 0.45 0.45 0.45 2.19
4.89 Cum 3785.55 1 Cum
27 Providing Children play equipment of standard make including cost and
conveyance of all material and all labour charges, all operational and
incidental charges etc complete.
Slide and Ladder 8 feet 1 x 1 1 No 18083.00 1 No
Swing Two seater 1 x 1 1 No 15087.00 1 No
Spiral Swing 1 x 1 1 No 18618.00 1 No
Sea-Saw 4 seater 1 x 1 1 No 13482.00 1 No
Merry go round 1 x 2 2 No 17013.00 1 No
Providing seating area development by providing cast Iron /Cement seats
as directed by Engineer incharge etc, complete.
Idle Park bench 1 x 6 6 No 13418.00 1 No
Sub- Total for Children Play area - D
E Garden Posts with LED Lamps
28 ELEC-13.2.2 : Fabrication and Supply of M.S. Poles for garden posts with 'B' ele ssr-7-
class 6 mtrs long 60.25mm outer dia with base plate and suitable pole cap 10-1 d
including cost and conveyance of all material including fixing of luminaire and
labour charges etc., complete. 6Mtrs 'B' Class M.S. pipe of 60.25mm dia with
base plate and suitable pole cap
Along the Path ways as per requirement 1 x 11 11 Nos #REF! 1 each

447524687.xlsx-Park-Venkateshwara colony 1935


Page 1936 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
29 Supply and fixing of 50mm dia 0.5 mtrs single arm M.S. pipe bracket with
sleeve and fasteners with necessary angle including painting etc., complete
on existing pole including fixing of luminaire.
1 x 11 11 Nos #REF! 1 each

447524687.xlsx-Park-Venkateshwara colony 1936


Page 1937 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
30 13.4.6 : Erection charges for 6Mtrs. Long MS / GI Garden post including
excavation of pit, concreting 1:3:6 and painting including cost and
conveyance of all materials including fixing of luminaire and labour charges
etc., complete.
Along the Path ways as per requirement 1 x 11 11 Nos #REF! 1 each
31 Supply and fixing of 300mm x 180mm x 140mm No.16 gauge CRCA sheet
box with hinged door and locking arrangements and din channel for fixing
2Nos MCBs duly powder coated with matching colour of poles including
fixing with necessary arrangments etc., complete.
1 x 11 11 Nos #REF! 1 each
32 Supply and fixing of 6-32A 10KA DP MCB, C/D Curve ISI Mark of make
Legrand / Schneider.
1 x 11 11 Nos #REF! 1 each
33 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain
Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of Data- Bld -
work with nomonal reinforcement Pi r2 d 18
a for Coping of Lamp post above GL 1 x 11 3.14 0.04 0.45 0.62 Cum 5044.84 1 Cum

447524687.xlsx-Park-Venkateshwara colony 1937


Page 1938 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
34 ELEC-3.11.1: Supply and transportation of ......... LED Street light Body ele ssr-3-9-
made of high grade pressure die – cast Aluminum alloy with corrosion 15
resistant powder coat, having protective toughened glass cover, Less Glare,
IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66)
protected, universal Voltage 100 - 270 V AC, P.F, ≥ 0.90, high power LED's
having efficacy ≥130 lumens/watt, and junction temperature < 75°C, with
Ingress protection IP66, Driver surge protection 4KV, with optics distribution
Type II medium, THD<10% at 110 Volts AC, driver efficiency ≥90%, CCT:
5600K, minimum CRI≥80, Inbuilt Electrical protections like Over voltage,
short circuit, Over load, Open Circuit, Miswiring, Intelligent pole mounting
option provides flexibility of vertical or horizontal pole mounting option
complete, with Top Openable Maintenance and Manufacture has to submit
LM79,LM80 & Photobiological Safety Report. Luminaire Performance
Complies to IS10322 (Part 5/Sec 3) & IEC 60598-1,IEC 60529 and ISO
certified company. LUMINAIRE MAKE : PHILIPS / OSRAM / GE /
CROMPTON / BAJAJ / SCHREDER / VIN / HALONIX / HAVELLS / HPL.
LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG /
LG LEDs.

Along the Path ways as per requirement 1 x 11 11.00 Nos #REF! 1 each
35 BLD-ELEC-3-1-4 : Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C.
insulated flexible copper cable in existing pipe for mains inlcuding all labour
charges etc., complete.
1 x 11 5.00 55.00 Rmt #REF! 1 Rmt
36 BLD-ELEC-3-1-2 : Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C.
insulated flexible copper cable in existing pipe for earth continuity including
all labour charges etc., complete.
1 x 11 5.00 55.00 Rmt #REF! 1 Rmt
37 ELEC-4.1.3 : Supply of 6 Sqmm 2 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part -
I) of Makes : Torrent / Universal / Unicab / Polycab / Havells / Gloster / KEI

Under ground Cable connecting all poles and extra for pole to panel 1 x 11 40.00 440.00 Rmt #REF! 1 Rmt
38 ELEC-4.1.5 : Supply of 10 Sqmm 4 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part -
I) of Makes : Torrent / Universal / Unicab / Polycab / Havells / Gloster / KEI.
from Panel to incomming 1 x 1 30.00 30.00 Rmt #REF! 1 Rmt

447524687.xlsx-Park-Venkateshwara colony 1938


Page 1939 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
39 ELEC-15.6.1 : Earth work excavation of Trench in hard ground soil, laying of
U.G cables upto 50 Sq,mm on sand cushion covering the cable with bricks
and back filling of Trench duly providing route indicator embedded in C.C
including cost and conveyance of materials and labour charges etc.,
complete.
for under ground Cabling 1 x 11 30.00 330.00 Rmt #REF! 1 Rmt
40 Supply, Transportation, fabrication and erection of following guage CRCA
sheet steel enclosure for power control cubicle panel / boxes etc., including
cutting, bending drilling, welding and reveting etc., complete with cleaning
with 7 tank process and painting with powder coating including cost and
conveyance of all materials and labour charges.
1 No of 0.9m x 1.20m size Box 1 x 1 1.200 0.900 1.08 Sqm #REF! 1 Sqm
41 BLD-ELEC-4-1-3: Supply and erection of Panel mounting cubical type ( 100
to 250A ) TPN 415V, 50 Hz. switch disconnector fuse unit complete with front
drive mechanism with door inter lock, padlocking arrangement etc., complete
with fuse links on existing control panel.
1 x 1 1.00 Nos #REF! 1 each
42 BLD-ELEC-4-3-3: Supply and erection of Panel mounting 125A, 4 Pole,
25kA, MCCB with thermal magnetic setting / Microprocessor based release
arrangement with all connections etc., complete on existing panel.
1 x 1 1.00 Nos #REF! 1 each
43 ELEC-3.5.1: Supply of Automatic Street Light Control System with Optical
Sensor, Low volatage / High voltage trip and reset, operating voltage 150 -
280V AC, 50 HZ with suitable SMC enclousure of IP 54 protection, MCBs
and contactor suitable to control the load of 3 KW of single phase load with
necessary clamping arrangements. Makes : Swadeep Nature Switch / Light
Mate.
1 x 1 1.00 Nos #REF! 1 each
44 BLD-ELEC-5-1-1 : Providing independent earthling by excavating a trench to
a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm
dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume
pipe ring duly providing staggered holes including filling with equal
proportion of Salt and Charcoal in layers and all labour charges etc.,
complete for small quarters.

2 Nos for Poles + 2 Nos for Panels 1 x 4 4 Nos #REF! 1 Rmt


Sub- Total for Garden Post Electrification - E
Total of A+B+C+D

447524687.xlsx-Park-Venkateshwara colony 1939


Page 1940 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
45 Water fall Type fountain: (FRP) location :to be located on the two supporting
stone masanry pillars for projected height of 20 feet & width 10 feet with MS
angle for load bearing and water turf (over head tank) to be fabricated in
stainless steel size 8 ft lenght x 3 ft width x 3 ft. height and duly connected
with flexible pipe/GI pipe from the bottom collection & commisioning etc,.
including all civil works etc,. complete.

Fountain 1 x 1 1 Nos 200000.00 1 Rmt


Total Rs.

447524687.xlsx-Park-Venkateshwara colony 1940


Page 1941 of 2191

f Divider and central lighting


ark at Venkateshwara Colony
& ABSTRACT ESTIMATION

Amount

1687.00

1893.00

3861.00

447524687.xlsx-Park-Venkateshwara colony 1941


Page 1942 of 2191

Amount

5393.00
3055.00

4887.00

10410.00

447524687.xlsx-Park-Venkateshwara colony 1942


Page 1943 of 2191

Amount

8842.00

2623.00

1318.00

447524687.xlsx-Park-Venkateshwara colony 1943


Page 1944 of 2191

Amount

7067.00

7925.00
58961.00

34105.76

447524687.xlsx-Park-Venkateshwara colony 1944


Page 1945 of 2191

Amount

188918.00

60086.40

245958.90

376662.00
905731.06

447524687.xlsx-Park-Venkateshwara colony 1945


Page 1946 of 2191

Amount

2131.56

10846.13

358189.50

17399.06

69786.00

447524687.xlsx-Park-Venkateshwara colony 1946


Page 1947 of 2191

Amount

11912.40

5935.64
8276.12
3599.64
3940.47
479038.83

20214.57

82800.88

447524687.xlsx-Park-Venkateshwara colony 1947


Page 1948 of 2191

Amount

18511.34

18083.00
15087.00
18618.00
13482.00
34026.00

80508.00
301330.79

#REF!

447524687.xlsx-Park-Venkateshwara colony 1948


Page 1949 of 2191

Amount

#REF!

447524687.xlsx-Park-Venkateshwara colony 1949


Page 1950 of 2191

Amount

#REF!

#REF!

#REF!

3128.00

447524687.xlsx-Park-Venkateshwara colony 1950


Page 1951 of 2191

Amount

#REF!

#REF!

#REF!

#REF!

#REF!

447524687.xlsx-Park-Venkateshwara colony 1951


Page 1952 of 2191

Amount

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
#REF!
#REF!

447524687.xlsx-Park-Venkateshwara colony 1952


Page 1953 of 2191

Amount

200000.00
#REF!

447524687.xlsx-Park-Venkateshwara colony 1953


KODADA MUNICIPALITY

Development of Parks in Nalgonda Municipality, Under Amrut

GENERAL ABSTRACT

S.No Description of Items Quantity

1 Construction of Park near Venkateshwara Temple at APHB Colony 1 No

Sub-Total. A Rs.

2 Add VAT @ 5%

3 Add Labour Cess @ 1%

4 Provision towards QC @ 1%

5 Provision towards seiniorage charges


Provision towards Consultancy charges for Preparation of DPRs @
6
1.5%
7 L.S for Unforseen items

Sub-Total. B Rs.

Total Project Cost ( A+B ) Rs.

Say Rs.
Amrut

Amount in Rs.

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
Page 1956 of 2191

Construction of Divider and central lighting


Construction of Park at Ravindra Nagar
DETAILED & ABSTRACT ESTIMATION
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
A Compound Wall
Compound Wall Front side 1 x 1 10.00
Total length of the Compound Wall 10.00 0.60 0.60 3.60
for gate Pillars 1 x 2 1.40 1.40 1.50 5.88
Deduction for gate pillars -1 x 2 1.40 0.60 0.60 -1.01
8.47 Cum
1 BLD-CSTN-2-1 (9) : Earth work excavation for foundations and depositing on
bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308).

% of Total Qty 1 x 1 90% 8.00 Cum 210.92 1 Cum


2 BLD-CSTN-2-7 - (15) : Earth work excavation for foundations and depositing
on bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308).

% of Total Qty 1 x 1 10% 1.00 Cum 1893.14 1 Cum


3 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level:
Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate:
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work.for foundation and under flooring bed.

for Compound Wall 1 x 1 10.00 0.60 0.10 0.60


for gate Pillars 1 x 2 1.40 1.40 0.15 0.59
Deduction for gate pillars -1 x 2 1.40 0.60 0.10 -0.17
1.02 Cum 3785.55 1 Cum

447524687.xlsx-Park-Ravindra Nagar 1956


Page 1957 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
4 BLD-CSTN-3-13- ( 30 ) - A- Nominal mix: RCC M- 20 Nominal mix
(Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS
456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and
its fabrication charges for finished item of work, but including centering and
shuttering charges for FOUNDATIONS, PLINTH, PEDESTALS

a Footings for Main Gate pillars 1 x 2 1.30 1.30 0.20 0.68 Cum 7930.76 1 Cum
b Pedastals for Gate pillars 1 x 2 0.45 0.45 0.90 0.36 Cum 8484.75 1 Cum
5 BLD-CSTN-3-13- ( 30 ) - B- Nominal mix: RCC M- 20 Nominal mix
(Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS
456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and
its fabrication charges for finished item of work, but including centering and
shuttering charges for COLUMNS, LINTELS, WATER TANKS, RCC WALLS
IN BUILDINGS - WOODEN SCAFFOLDING

for Gate pillars 1 x 2 0.30 0.30 2.70 0.49 Cum 9973.53 1 Cum
6 BLD-CSTN-6-12-(67) : Construction of RR Masonary in Cement Mortor
( 1:8 ) Prop using hard granite stone including cost & Conveyance of all
materials like Cement, Sand , Water, Granite Stones, including Seigniorage
Charges on all Materials, ,labour charges for cutting Stones to required size
and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges
curing etc., complete for finished item of Work .

For Foundations below GL


for Compound Wall 1 x 1 10.00 0.60 0.50 3.00
3.00 Cum 3470.13 1 Cum

447524687.xlsx-Park-Ravindra Nagar 1957


Page 1958 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
7 BLD-CSTN-6-5-(60) : Construction of CRS Masonary 1st Sort in Cement
Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of
all materials like Cement, Sand , Water, Granite Stones, labour charges for
cutting Stones to required size and shape, mixing of Cement Mortor,
Construction, Scaffolding Charges curing etc., complete for finished item of
Work .
Compound Wall Front side excluding gate 1 x 1 6.00 0.45 0.60 1.62
for pillars for fixing MS grills in front side at every 3.00m C/C 1 x 3 0.45 0.45 1.50 0.91
Deduction for CRS pillars from wall -1 x 3 0.45 0.45 0.60 -0.36
Net Qty 2.17 Cum 4074.46 1 Cum
8 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level
Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work with nomonal reinforcement

Over CRS Walls in front side for fixing the Grills (0.15+0.2)/2 2 x 2 3.00 0.225 0.175 0.47
Over CRS Pillars in front side 1 x 3 0.45 0.45 0.075 0.05
0.52 Cum 5044.84 1 Cum
9 BLD-CSTN-7-1-(72) : Providing flush Cement Pointing to CRS Masonary in
Cement Mortor (1:3) Prop . for including cost & conveyance of all materials
to site , seignaiorage charges on all materials, labour charges on all
materials, curing etc., Complete for finished item of work
Both sides of CRS walls
Compound Wall Front side excluding gate 1 x 2 6.00 0.60 7.20
for pillars for fixing MS grills in front side at every 3.00m C/C 3 x 4 0.45 1.50 8.10
15.30 Sqm 86.17 1 Sqm

447524687.xlsx-Park-Ravindra Nagar 1958


Page 1959 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
10 BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/
Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe
500 grade as per IS 1786-1979) of different diameters for RCC works ,
including labour charges for straightening, cutting, bending to required sizes
and shapes, placing in position with cover blocks of approved materials and
size and tying and lap-splicing with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and drawings, including cost
and conveyance of steel bars, including all wastages such as overlaps,
couplings, chairs, spacer bars including cost and conveyance of binding
wire, cover blocks and all incidental, operational, labour charges such as
cutting, bending, placing in position, tying including sales and other taxes on
all materials etc., complete for finished item of work in all floors.( APSS
No.126
For Footing & Pedastals 1.04 Cum 40.00 Kg/Cum 41.60
For Columns 0.49 Cum 125.00 Kg/Cum 61.25
102.85 Kg 68.71 1 Kg
11 Supplying and fixing of MS Grills as per Drawings including fixing with 4 Nos
of MS Z holdfasts (2 on each side) duly making cutting masonry, fixing and
making to original surface neatly and painting gate with one coat of red oxide
primer including cost and conveyance of all materials,Locking arrangment,
Ornamental pieces etc ,cutting, bending, welding including all operational
charges and all labour charges etc., complete for finished item of work.

MS Grills for compound wall @ 45 Kg/each ( 2.5 x1.35m) 1 x 2 45.00 Kg/each 90.00 Kg 88.05 1 Kg
Sub- Total for Compound wall - A
B Path ways
12 BLD-CSTN-2-1 (9): Earth work excavation and depositing on bank for all lifts
and with an initial lead of 10m including all operational, incidental, labour
charges such as shoring ,sheeting, planking, strutting, etc. complete for
finished item of work including seigniorage excluding dewatering charges etc
as per SS - 20 B (APSS 308). Data- Bld -
3
a For Walking Track/ Path ways
Length of path ways-
for sectioning and levelling the ground for Pathways 1 x 1 220.00 2.00 0.200 88.00
for kerbing walls on both sides of the path ways 1 x 2 220.00 0.30 0.150 19.80
Total Qty 107.80 Cum 210.92 1 Cum

447524687.xlsx-Park-Ravindra Nagar 1959


Page 1960 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
13 RBR-TSRA-29 : Cast in Situ Cement Concrete M20 Kerb: Construction of
cement concrete kerb with top and bottom width 115 and 165 mm
respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150
mm thick, foundation having 50 mm projection beyond kerb stone, kerb
stone laid with kerb laying machine, foundation concrete laid manually, all
complete as per clause 408 MORTH data-
parks-22
for Kerbing of Pathways 1 x 2 220.00 440.00
440.00 Rmt 286.24 1 Rmt
14 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating
each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310) Data- Bld -
10
For levelling the track between walls 1 x 1 220.00 2.00 0.100 44.00
44.00 Cum 910.40 1 Cum
15 BLD-CSTN-3-6 ( 23 ) -Hand mixing up to Plinth Level : Plain Cement
concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse
aggregate ) using 40mm size Hard Granite Machine Crushed Metal including
cost and conveyance of all materials like cement, sand, coarse aggregate
water etc., to site , seigniorage charges on all materials, labour charges ,
for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface
to the required level curing etc., complete for finished item of work.for
foundation and under flooring bed. Data- Bld -
15
a For levelling the walking track between walls 1 x 1 220.00 2.00 0.100 44.00
Total Qty 44.00 Cum 3726.65 1 Cum
16 RBR-CCPV-13 - ii: Providing and Laying of Interlocking Concrete Block
Pavements using PHOENIX or equivalent high strength Cement Concrete
interlocking Regular Pavers of 50 mm thickness of M- 40 Grade of which top
12 mm thick shall be for colour pigmentation with imported colours and
white cement to get required reflective glazing inclusive of all taxes - as per
drawing and Technical Specification Clause 1504 MORD Data- Bld -
124
a For Walking Track/ Path ways 1 x 1 220.00 2.00 440.00
Total Qty 440.00 Sqm 570.70 1 Sqm
Sub- Total for Path ways -B
C Greenary & Play Area

447524687.xlsx-Park-Ravindra Nagar 1960


Page 1961 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
17 RBR-STCL-2 : Clearing and grubbing road land including uprooting wild
vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm,
removal of stumps of such trees cut earlier and disposal of unserviceable
materials and stacking of serviceable material to be used or auctioned, upto
a lead of 1000 m including removal and disposal of top organic soil not
exceeding 150 mm in thickness as per Technical Specification Clause 201
MORD / MORTH.

for clearing the site ( Area as o\per Drawing) 1 x 1 750.00 750.0 Sqm 22.92 10 Sqm
18 RBR-EECD-5 : ii: Excavation for roadway in soil by mechanical means
including cutting and pushing the earth to site of embankment upto a
distance of 100 m, including trimming bottom and side slopes in accordance
with requirements of lines, grades and cross-sections as per Technical
Specification Clause 302.3 MORD / 301 MORTH.
1 x 1 750.00 0.250 187.50 Cum 46.65 1 Cum
19 Based on Item No.2 of HMDA (FSR), Pg.31 - FISCUE / SHADE GRASS
(Dibbling) : Making lawns by Dressing the surface to the desired shape,
laying 6" layer of fine red soil, covered with a thin layer of sand watering,
rolling with hand roller (4" thckness after rolling), including the cost of red
earth, sand and labour charges and the cost of fertlizers, chemical and grass
etc,. complete as per standard practice. Data -Parks
- 22
Area as per Drawing 1 x 1 750.00
750.00 Sqm 385.15 1 Sqm
20 Based on Item No.6.a of HMDA (FSR), Pg.31 -Ground Covers : Bed
preparation 6" layer of soil mixture 3:1:1 ratio red soil, farmyard manure and
river sand and application of fertolizers (@ 20 gms/pit/sqmt), smooth surface
as per design including cost of soil mixture, filling of the soil mixture and
internal transportation. Data -Parks
-8
Area as per Drawing 1 x 1 50.00 50.0
50.00 Rmt 280.63 1 Rmt
21 RBR-HRTC-9: Planting of trees by the road side (Avenue trees) in 0.60 m dia
holes, 1 m deep dug in the ground, mixing the soil with decayed farm
yard/sludge manure, planting the saplings, backfilling the trench, watering,
Data -Parks
fixing the tree guard and maintaining the plants for one year -9
Ornamental trees along the compound wall in side the park 1 x 41 41.00 Nos 1550.80 1 Nos

447524687.xlsx-Park-Ravindra Nagar 1961


Page 1962 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
22 Based on Item No.3.c of HMDA (FSR), Pg.31- Hedge/shrub planting: Digging
the trench of size 15cm depth, refilling the trench with red soil including cost
of red soil and farmyard manure at 4:1 ratio internal transportation of plants
and planting the plants including the application of fertilizers and perticides Data -Parks
26
etc., (A 20 gms/pit/sqmt) complete but excluding the cost of the fertilizers @
as
20 per Drawing along
gms/pit/sqmt) the compound
and plant material wall 1 x 1 41 41.00 Rmt 264.72 1 Rmt
23 Planting Speciman plants including digging of pits 60cm. Cubes, loosening of
15cm. Bottom red soil, filling with soil with 10 kg Compost + 100 DAP per pit
staking gap filling with in two month after planting.
Golden bamboo 8” 1 x 4 4 Nos 1483.91 1 No
Fercaria 2” 1 x 4 4 Nos 2069.03 1 No
Ficus 4” (Verites). 1 x 3 3 Nos 1199.88 1 No
Bottle Bush 1 x 3 3 Nos 1313.49 1 No
Sub- Total for Greenary - C
D Children Play Area
24 BLD-CSTN-2-1 (9) : Earth work excavation for foundations and depositing on
bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308). Data- Bld -
3
for foundations of Slide and Ladder 1 x 3 0.60 0.60 0.75 0.81
for foundations of Swing Two seater 1 x 2 0.60 0.60 0.75 0.54
for foundations of Spiral Swing 1 x 1 0.75 0.75 0.75 0.42
for foundations of Sea-Saw 4 seater 1 x 1 0.75 0.75 0.75 0.42
for foundations of Merry go round 1 x 1 0.75 0.75 0.90 0.51
for Idle Park bench 6 x 4 0.45 0.45 0.45 2.19
for filling Sand 1 x 1 21.50 14.10 0.30 90.95
95.84 Cum 210.92 1 Cum
25 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating
each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310)

Filling sand - Children play area 1 x 1 21.5 14.10 0.30 90.95 Cum 910.40 1 Cum

447524687.xlsx-Park-Ravindra Nagar 1962


Page 1963 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
26 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level :
Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate:
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work.for foundation and under flooring bed. Data- Bld -
15
for foundations of Slide and Ladder 1 x 3 0.60 0.60 0.75 0.81
for foundations of Swing Two seater 1 x 2 0.60 0.60 0.75 0.54
for foundations of Spiral Swing 1 x 1 0.75 0.75 0.75 0.42
for foundations of Sea-Saw 4 seater 1 x 1 0.75 0.75 0.75 0.42
for foundations of Merry go round 1 x 1 0.75 0.75 0.90 0.51
for Idle Park bench 6 x 4 0.45 0.45 0.45 2.19
4.89 Cum 3785.55 1 Cum
27 Providing Children play equipment of standard make including cost and
conveyance of all material and all labour charges, all operational and
incidental charges etc complete.
Slide and Ladder 8 feet 1 x 1 1 No 18083.00 1 No
Swing Two seater 1 x 1 1 No 15087.00 1 No
Spiral Swing 1 x 1 1 No 18618.00 1 No
Sea-Saw 4 seater 1 x 1 1 No 13482.00 1 No
Merry go round 1 x 2 2 No 17013.00 1 No
Providing seating area development by providing cast Iron /Cement seats
as directed by Engineer incharge etc, complete.
Idle Park bench 1 x 6 6 No 13418.00 1 No
Sub- Total for Children Play area - D
E Garden Posts with LED Lamps
28 ELEC-13.2.2 : Fabrication and Supply of M.S. Poles for garden posts with 'B' ele ssr-7-
class 6 mtrs long 60.25mm outer dia with base plate and suitable pole cap 10-1 d
including cost and conveyance of all material including fixing of luminaire and
labour charges etc., complete. 6Mtrs 'B' Class M.S. pipe of 60.25mm dia with
base plate and suitable pole cap
Along the Path ways as per requirement 1 x 7 7 Nos #REF! 1 each

447524687.xlsx-Park-Ravindra Nagar 1963


Page 1964 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
29 Supply and fixing of 50mm dia 0.5 mtrs single arm M.S. pipe bracket with
sleeve and fasteners with necessary angle including painting etc., complete
on existing pole including fixing of luminaire.
1 x 7 7 Nos #REF! 1 each

447524687.xlsx-Park-Ravindra Nagar 1964


Page 1965 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
30 13.4.6 : Erection charges for 6Mtrs. Long MS / GI Garden post including
excavation of pit, concreting 1:3:6 and painting including cost and
conveyance of all materials including fixing of luminaire and labour charges
etc., complete.
Along the Path ways as per requirement 1 x 7 7 Nos #REF! 1 each
31 Supply and fixing of 300mm x 180mm x 140mm No.16 gauge CRCA sheet
box with hinged door and locking arrangements and din channel for fixing
2Nos MCBs duly powder coated with matching colour of poles including
fixing with necessary arrangments etc., complete.
1 x 7 7 Nos #REF! 1 each
32 Supply and fixing of 6-32A 10KA DP MCB, C/D Curve ISI Mark of make
Legrand / Schneider.
1 x 7 7 Nos #REF! 1 each
33 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain
Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of Data- Bld -
work with nomonal reinforcement Pi r2 d 18
a for Coping of Lamp post above GL 1 x 7 3.14 0.04 0.45 0.40 Cum 5044.84 1 Cum

447524687.xlsx-Park-Ravindra Nagar 1965


Page 1966 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
34 ELEC-3.11.1: Supply and transportation of ......... LED Street light Body ele ssr-3-9-
made of high grade pressure die – cast Aluminum alloy with corrosion 15
resistant powder coat, having protective toughened glass cover, Less Glare,
IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66)
protected, universal Voltage 100 - 270 V AC, P.F, ≥ 0.90, high power LED's
having efficacy ≥130 lumens/watt, and junction temperature < 75°C, with
Ingress protection IP66, Driver surge protection 4KV, with optics distribution
Type II medium, THD<10% at 110 Volts AC, driver efficiency ≥90%, CCT:
5600K, minimum CRI≥80, Inbuilt Electrical protections like Over voltage,
short circuit, Over load, Open Circuit, Miswiring, Intelligent pole mounting
option provides flexibility of vertical or horizontal pole mounting option
complete, with Top Openable Maintenance and Manufacture has to submit
LM79,LM80 & Photobiological Safety Report. Luminaire Performance
Complies to IS10322 (Part 5/Sec 3) & IEC 60598-1,IEC 60529 and ISO
certified company. LUMINAIRE MAKE : PHILIPS / OSRAM / GE /
CROMPTON / BAJAJ / SCHREDER / VIN / HALONIX / HAVELLS / HPL.
LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG /
LG LEDs.

Along the Path ways as per requirement 1 x 7 7.00 Nos #REF! 1 each
35 BLD-ELEC-3-1-4 : Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C.
insulated flexible copper cable in existing pipe for mains inlcuding all labour
charges etc., complete.
1 x 7 5.00 35.00 Rmt #REF! 1 Rmt
36 BLD-ELEC-3-1-2 : Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C.
insulated flexible copper cable in existing pipe for earth continuity including
all labour charges etc., complete.
1 x 7 5.00 35.00 Rmt #REF! 1 Rmt
37 ELEC-4.1.3 : Supply of 6 Sqmm 2 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part -
I) of Makes : Torrent / Universal / Unicab / Polycab / Havells / Gloster / KEI

Under ground Cable connecting all poles and extra for pole to panel 1 x 7 40.00 280.00 Rmt #REF! 1 Rmt
38 ELEC-4.1.5 : Supply of 10 Sqmm 4 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part -
I) of Makes : Torrent / Universal / Unicab / Polycab / Havells / Gloster / KEI.
from Panel to incomming 1 x 1 30.00 30.00 Rmt #REF! 1 Rmt

447524687.xlsx-Park-Ravindra Nagar 1966


Page 1967 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
39 ELEC-15.6.1 : Earth work excavation of Trench in hard ground soil, laying of
U.G cables upto 50 Sq,mm on sand cushion covering the cable with bricks
and back filling of Trench duly providing route indicator embedded in C.C
including cost and conveyance of materials and labour charges etc.,
complete.
for under ground Cabling 1 x 7 30.00 210.00 Rmt #REF! 1 Rmt
40 Supply, Transportation, fabrication and erection of following guage CRCA
sheet steel enclosure for power control cubicle panel / boxes etc., including
cutting, bending drilling, welding and reveting etc., complete with cleaning
with 7 tank process and painting with powder coating including cost and
conveyance of all materials and labour charges.
1 No of 0.9m x 1.20m size Box 1 x 1 1.200 0.900 1.08 Sqm #REF! 1 Sqm
41 BLD-ELEC-4-1-3: Supply and erection of Panel mounting cubical type ( 100
to 250A ) TPN 415V, 50 Hz. switch disconnector fuse unit complete with front
drive mechanism with door inter lock, padlocking arrangement etc., complete
with fuse links on existing control panel.
1 x 1 1.00 Nos #REF! 1 each
42 BLD-ELEC-4-3-3: Supply and erection of Panel mounting 125A, 4 Pole,
25kA, MCCB with thermal magnetic setting / Microprocessor based release
arrangement with all connections etc., complete on existing panel.
1 x 1 1.00 Nos #REF! 1 each
43 ELEC-3.5.1: Supply of Automatic Street Light Control System with Optical
Sensor, Low volatage / High voltage trip and reset, operating voltage 150 -
280V AC, 50 HZ with suitable SMC enclousure of IP 54 protection, MCBs
and contactor suitable to control the load of 3 KW of single phase load with
necessary clamping arrangements. Makes : Swadeep Nature Switch / Light
Mate.
1 x 1 1.00 Nos #REF! 1 each
44 BLD-ELEC-5-1-1 : Providing independent earthling by excavating a trench to
a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm
dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume
pipe ring duly providing staggered holes including filling with equal
proportion of Salt and Charcoal in layers and all labour charges etc.,
complete for small quarters.

2 Nos for Poles + 2 Nos for Panels 1 x 4 4 Nos #REF! 1 Rmt


Sub- Total for Garden Post Electrification - E
Total of A+B+C+D

447524687.xlsx-Park-Ravindra Nagar 1967


Page 1968 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
45 Water fall Type fountain: (FRP) location :to be located on the two supporting
stone masanry pillars for projected height of 20 feet & width 10 feet with MS
angle for load bearing and water turf (over head tank) to be fabricated in
stainless steel size 8 ft lenght x 3 ft width x 3 ft. height and duly connected
with flexible pipe/GI pipe from the bottom collection & commisioning etc,.
including all civil works etc,. complete.

Fountain 1 x 1 1 Nos 200000.00 1 Rmt


Total Rs.

447524687.xlsx-Park-Ravindra Nagar 1968


Page 1969 of 2191

f Divider and central lighting


of Park at Ravindra Nagar
& ABSTRACT ESTIMATION

Amount

1687.00

1893.00

3861.00

447524687.xlsx-Park-Ravindra Nagar 1969


Page 1970 of 2191

Amount

5393.00
3055.00

4887.00

10410.00

447524687.xlsx-Park-Ravindra Nagar 1970


Page 1971 of 2191

Amount

8842.00

2623.00

1318.00

447524687.xlsx-Park-Ravindra Nagar 1971


Page 1972 of 2191

Amount

7067.00

7925.00
58961.00

22737.18

447524687.xlsx-Park-Ravindra Nagar 1972


Page 1973 of 2191

Amount

125946.00

40057.60

163972.60

251108.00
603821.38

447524687.xlsx-Park-Ravindra Nagar 1973


Page 1974 of 2191

Amount

1719.00

8746.88

288862.50

14031.50

63582.80

447524687.xlsx-Park-Ravindra Nagar 1974


Page 1975 of 2191

Amount

10853.52

5935.64
8276.12
3599.64
3940.47
399082.19

20214.57

82800.88

447524687.xlsx-Park-Ravindra Nagar 1975


Page 1976 of 2191

Amount

18511.34

18083.00
15087.00
18618.00
13482.00
34026.00

80508.00
301330.79

#REF!

447524687.xlsx-Park-Ravindra Nagar 1976


Page 1977 of 2191

Amount

#REF!

447524687.xlsx-Park-Ravindra Nagar 1977


Page 1978 of 2191

Amount

#REF!

#REF!

#REF!

2018.00

447524687.xlsx-Park-Ravindra Nagar 1978


Page 1979 of 2191

Amount

#REF!

#REF!

#REF!

#REF!

#REF!

447524687.xlsx-Park-Ravindra Nagar 1979


Page 1980 of 2191

Amount

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
#REF!
#REF!

447524687.xlsx-Park-Ravindra Nagar 1980


Page 1981 of 2191

Amount

200000.00
#REF!

447524687.xlsx-Park-Ravindra Nagar 1981


SIDDIPET MUNICIPALITY

Development of Parks at Siddipet Municipality under Amrut Scheme

GENERAL ABSTRACT

S.No Description of Items Quantity

1 Construction of Park at APHB Colony 1 No

2 Construction of Park at Mythrivanam 1 No

3 Laying of interlocking tiles for Parking 595 Sqm

4 Providing Solar Lighting #REF! No

5 Drilling of Borewell and fitted with submersible motor. Err:509 No

6 Providing Rain Water Hervesting Structures Err:509 Nos

Sub-Total. A Rs.

7 Add VAT @ 5%

8 Add Labour Cess @ 1%

9 Provision towards QC @ 1%

10 Provision towards NAC @ 0.1%


Provision towards Consultancy charges for Preparation of DPRs @
11
1.5%
12 L.S for Unforseen items and including Garbage Bins

Sub-Total. B Rs.

Total Project Cost ( A+B ) Rs.

Say Rs.
ut Scheme

Amount in Rs.

970327.00

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

152995.00

Err:509

Err:509

Err:509
KODADA MUNICIPALITY

Development of Parks in Nalgonda Municipality, Under Amrut

GENERAL ABSTRACT

S.No Description of Items Quantity

1 Devlopment of Park near Municipal Office 1 No

2 Development of Rajiv Park 1 No

Sub-Total. A Rs.

3 Add VAT @ 5%

4 Add Labour Cess @ 1%

5 Provision towards QC @ 1%

6 Provision towards NAC @ 0.1%

7 Provision towards seiniorage charges


Provision towards Consultancy charges for Preparation of DPRs @
8
1.5%
9 L.S for Unforseen items and including Garbage Bins

Sub-Total. B Rs.

Total Project Cost ( A+B ) Rs.

Say Rs.
Amrut

Amount in Rs.

#REF!

9457102.00

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
Page 1986 of 2191

KODADA MUNICIPALITY
Construction of Park behind Sai Techno School at APHB Colony
DETAILED & ABSTRACT ESTIMATION
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
A Greenary & Childern's Play Area
1 RBR-HRTC-5:Making lawns including ploughing and breaking of clod,
removal of rubbish, dressing and supplying doobs grass roots and planting at
15 cm apart, including supplying and spreading of farm yard manure at rate
of 0.18 cum per 100 sqm including maintaning for 1 year. Data -Parks
-5
Area as per Drawing 1 x 1 610.00
610.00 Sqm 37.60 1 Sqm
2 BLD-CSTN-2-9 (17) : Filling with useful available excavated earth (excluding
rock) in trenches, sides of foundations and basement with initial lead in
layers not exceeding 15 cm thick, consolidating each deposited layer by
watering and ramming including cost and conveyance of water to work site
and all operational, incidental, labour charges, hire charges of T & P etc.,
complete for finished item of work. (APSS NO. 309 & 310)

Filling Top soil 1 x 1 610.00 0.30 183.00


183.00 Sqm 29.94 1 Sqm
3 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating
each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310)

Children's Play area & Sand Pit 1 x 1 220.00 0.30 66.00


66.00 Cum 910.40 1 Cum
4 RBR-HRTC-8: Planting ( Running metres 200 plants and 800 shrubs in two
rows in one km length of road where width of verge is 3m and above.)as per Data -Parks
Specification 307 MORTH -8
Area as per Drawing 1 x 320 320.00
320.00 Rmt 124.94 1 Rmt

447524687.xlsx-2. Greenary & C.Play area- 1986


Page 1987 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
5 RBR-HRTC-9: Planting of trees by the road side (Avenue trees) in 0.60 m dia
holes, 1 m deep dug in the ground, mixing the soil with decayed farm
yard/sludge manure, planting the saplings, backfilling the trench, watering,
Data -Parks
fixing the tree guard and maintaining the plants for one year -9
Ornamental trees 1 x 80 80.00 Nos 1550.80 1 Nos

447524687.xlsx-2. Greenary & C.Play area- 1987


Page 1988 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
6 RBR-HRTC-7: Planting permanent hedges including digging of trenches, 60
cm wide and 45 cm deep, refilling the excavated earth mixed with farmyard
manure, supplied at the rate of 4.65 cum per 100 metres and supplying and
planting hedge plants at 30 cm apart, and maintaining for 1 year Data -Parks
- 7 (a)
as per Drawing 1 x 2 192.00 Rmt 222.40 1 Rmt
7 Planting palms including digging of pits 60cm. Cubes, loosening of 15cm. As Per
Bottom red soil, filling with soil with 10 kg Compost + 100 DAP per pit staking Quotation
gap filling with in two month after planting. s
inside the Lawns and other places 2 x 32 64 Nos 350.00 1 Nos
8 Planting Speciman plants including digging of pits 60cm. Cubes, loosening of As Per
15cm. Bottom red soil, filling with soil with 10 kg Compost + 100 DAP per pit Quotation
staking gap filling with in two month after planting. s
Golden bamboo 8” 1 x 15 15 Nos 862.50 1 No
Fercaria 2” 1 x 10 10 Nos 1437.50 1 No
Ficus 4” (Verites). 1 x 10 10 Nos 575.00 1 No
Bottle Bush 1 x 10 10 Nos 690.00 1 No
9 Providing seating area development by providing cast Iron /Cement seats As Per
as directed by Engineer incharge etc, complete. Quotation
s
Idle Park bench 1 x 10 10 No 9875.00 1 No
10 See Saw 4 Seater 1 x 3 3 No 11645.00 1 No
11 Swinging Bench 1 x 3 3 No 19500.00 1 No
12 4 Way Climber 1 x 3 3 No 19080.00 1 No
13 Provision for Name Boards
Sub- Total for Greenary
Total of A+B+C
Say Rs.

447524687.xlsx-2. Greenary & C.Play area- 1988


Page 1989 of 2191

ADA MUNICIPALITY
nd Sai Techno School at APHB Colony
& ABSTRACT ESTIMATION

Amount

22936.00

5479.02

60086.40

39980.80

447524687.xlsx-2. Greenary & C.Play area- 1989


Page 1990 of 2191

Amount

124064.00

447524687.xlsx-2. Greenary & C.Play area- 1990


Page 1991 of 2191

Amount

42700.80

3850.00

4312.50
7187.50
2875.00
3450.00

98750.00
34935.00
58500.00
57240.00
5000.00
571347.02
571347.00
5.71 Lakhs

447524687.xlsx-2. Greenary & C.Play area- 1991


Data for MS Gate
1 Supply, fabrication and fixing in position of MS sections of Horizontal member 20mm square bars of 2 Nos and
Vertical member 20mm Sqare bars c/c of 8" , for edges 2"X2" sq pipe in M.S including cost and conveyance of
all material and all labour chages etc complete.
Requirement of MS Sections of 1 Mts span

Description Nos Length Total length Wt. for Rmt


Horizontal member 20mm sq bars 4 2.26 9.04 m 3.14 Kg/m
Vertical member 20mm sq bars 22 2.12 46.64 m 3.14 Kg/m
Vertical membber - MS 2"x2" sq pipe 2 2.28 4.56 m 1.64 Kg/m
Vertical membber - MS 2"x2" sq pipe 2 1.95 3.90 m 1.64 Kg/m

Total weight in Kg

RATES
Cost of Mild Steel Tubes & pipes of all
diameters as per IS-1161r -SSR item No. 44.50 /Kg
fabricating all heavy steel works like
Trusses, Stanchions, Heavy Beams and
Girders etc excluding cost of fixing in
position 26.00 /Kg
Labour charges for fixing Iron Doors, Iron
Windows and 4.00 /Kg
Grills in position
ABSTRACT

Cost of gate etc 217.05 Kg 44.50 1 Kg


fabrication charges 217.05 Kg 26.00 1 Kg
Labour charges 217.05 Kg 4.00 1 Kg
add for Synthetic enamil painting, nuts and
bolts and transportation etc
Add Municipal allowance 0%
Total per 1m Rs.
square bars of 2 Nos and
g cost and conveyance of

Total weight
28.39
146.45
7.49
6.41
28.31
217.05

9659.00
5643.00
868.00

116.00
0.00
16286.00
Data for MS Gate
1 Supply, fabrication and fixing in position of MS sections of Horizontal member 20mm square bars of 2 Nos and
Vertical member 20mm Sqare bars c/c of 8" , for edges 2"X2" sq pipe in M.S including cost and conveyance of
all material and all labour chages etc complete.
Requirement of MS Sections of 1 Mts span

Description Nos Length Total length Wt. for Rmt


Horizontal member 20mm sq bars 4 1.52 6.10 m 3.14 Kg/m
Vertical member 20mm sq bars 7 2.12 14.84 m 3.14 Kg/m

Vertical membber - MS 2"x2" sq pipe 0 2.28 0.00 m 1.64 Kg/m


Vertical membber - MS 2"x2" sq pipe 0 1.95 0.00 m 1.64 Kg/m

Total weight in Kg
square bars of 2 Nos and
g cost and conveyance of

Total weight
19.15
46.60
11.60
77.35
0.00
0.00
15.47
170.17
Page 1996 of 2191

SIDDIPET MUNICIPALITY

#REF!

Detailed and Abstract Estimate for Drilling of Borewells


S.N Description Nos L B D Qty Rate Per
A Drilling of Bore well
1 Drilling of Bore well by down the hole hammer (DTH) drilling to finished dia of
163 mm in all formations to the depth specified and reaming the bores to the
required dia flushing the bore walls at an average pressure of 7 kg/cm2 (100
PSI) conducting yield test, inclusive of transportation from point to point, crew
charges, cost of consumables, shifting of Rig and all other charges etc,.The
bore wells should be true & vertical and work should be carried out to the
satisfaction of the department and carried out as per IS 2800 I & II / 1979
and amendments if any from time to time, the rate is including all taxes etc,.
complete as applicable.
data-Borewells
-Sn - 1
Depth of the Borewells
Point No.1 - up to 90.00m depth (Q) 1 x 1 210 90.00 90.00 Rmt LS 1 Rmt
above 90.00m depth (Q) 120.00 120.00 Rmt LS 1 Rmt
2 Supplying and fixing of 160mm dia PVC Casing pipe of 6kg/cm2 including
cost and conveyance, all labour charges and central excise duty and sales
data-HDPE &
tax .
PVC Pipes
Depth of the casing as per Geologist report
Point No.1 1 x 1 16.00 16.00
16.00 Rmt #REF! 1 Rmt
3 Manufacture, Supply, Delivery, Installation and Commissioning of
Submersible Pumpset suitable to 163 mm dia Bore wells coupled with Motor
Single Phase 2880 RPM 340 V(-15% + 10% range – 290 to 375 Volts) of
reputed make with minimum overall efficiency of 40% at the duty point with
Radial/Mixed flow and testing commissioning of pumpset with a trial run of
one week in any where Ranga Reddy District. The pump set should confirm
to IS 8034:1989 and motor should confirm to IS 9283:1979 with ISI 2000
Mark with a guarantee period of 18 Months from the date of installation. The
rates are including cost and conveyance of material, all taxes, Surcharges,
VAT, Excise duty, overhead charges and transportation charges etc.,
complete, excluding all accessories: RC Bore
wells-1

Est-Borewells-1 1996
Page 1997 of 2191

S.N Description Nos L B D Qty Rate Per


a 2 HP Single Phase Pump sets to a discharge range of upto 15 to 40 Lpm 1 x 1 1 Nos 15700.00 1 Nos
and a head range of 119 to 50m - Texmo / CRI make (Q)

Est-Borewells-1 1997
Page 1998 of 2191

S.N Description Nos L B D Qty Rate Per


4 Supply and delivery of wall mounted Industrial type Control panel board of
size 600x600x250mm made of 18 SWG CRCA sheet steel enclosure, 14
SWG mounting palte for cable entry fabricated, painted with two coats of red
Oxide primer and two coats of final light Grey paint, lock and key
arrangements two side lovures with weld mesh inside etc., completed
consisting of the follwing equipment with all internal wiring using Fine
cab.Finolex cables of suitable size and capacity and cable clamps etc.,
complete for 3-phase power pumps of 415 V-50 HZ for delivery at any where
in A.P.
a) Volt Meter : 0-500 V 96x96mm size 1 No.
b).Ammeter: 0-20 A-1- No.(96x96mm size) upto 7.50HP - 1 No
c) Dry running preventor with elecytrode of suitable range 1 No.
d). Single phasing preventor 1 No.
e) Swith fuse unit with HRC fuses IP & N confirming to IS 4064- 1 set ( 32
AMPS up to 7.5 HP)
f). Indication Lamps(R-Y-B) with dropper resistance 230V-1 set.
g) Holder with Switch controle - 1 No.
h).Voltmeter selector switch - 1 No.
i). Starters-direct-on-line starter in sheet steel enclosure suitable upto 7.50HP
motor rating Ac-3-duty,415V,50Hz 3 phase.
j). Supply and delivery of capacitor as per APSEB rules for LT connections as
per IS: 2834 with dropper resistance, data connection- 2 KVAR suitable
above 3 HP to 6HP and 3 KVAR above 6 HP to 7.50 HP)
RC -2-S.N.1
&4

Panel board up to 7.5HP Motors 1 x 1 1 Nos 6110.00 1 Nos


5 Supply and delivery of suitable flexible pipe to encase the submersible cable
RC -2-S.N.4

1 x 1 15.00 15 Rmt 12.00 1 Rmt


6 Supply abd delivery of PVC insulated and PV sheated flexible 3 core flat type
submersible cables suitable for submersible pumpsets conductors composed
of ennealed high conductivity copper wire, conforming to IS 694 with its
revisions and ammendments from time to time and delivery at site of
installation of pumpset including central excise duty freight and transit
insurances etc., complete (in small quantities) but exclussive APGST RC -2-S.N.6

a 3 core 2.50 Sqmm cable, for bore wells ;


Point No.1 - up to 90.00m depth 1 x 1 210.00 195.00
Say 205.00 Rmt 66.00 1 Rmt

Est-Borewells-1 1998
Page 1999 of 2191

S.N Description Nos L B D Qty Rate Per


7 Manufacture, supply, & delivery of 16Kg/Sqcm HDPE pipes conforming to IS
4984 - 1995 including transportation to any where in A.P, excise duty, sale tax data-HDPE &
etc., complete. PVC Pipes
40mm dia suction pipe 1 x 1 210.00 210.00 Rmt #REF! 1 Rmt

Est-Borewells-1 1999
Page 2000 of 2191

S.N Description Nos L B D Qty Rate Per


8 Supply and delivery of Galvanised Mild steel bends heavy duty " C" class
threaded at both ends at site of work for pump installation including cost and
conveyance of all materials, all taxes and duties and transit insurance etc,
RC -2-S.N.8
complete.
a 50mm dia 900 bends with arm length of 25Cm 2 x 1 2 Nos 180.00 1 Nos
9 Supply and delivery of MS Clamp set 45mm length,12mm thick plate, 75mm
wide with 6Nos of 16mm dia Bolts & Nuts at site of work for pump installation
including cost and conveyance of all materials, all taxes and duties and transit
RC -2-S.N.10
insurance etc, complete.
a 50mm dia 1 x 1 1 Nos 390.00 1 Nos
10 Supply and delivery of 50mm dia MS Flange set (2Nos) of 150mm dia OD
12mm thick of each Flange with 4 Nos 15mm dia bolts and nuts as per RWS
RC includin C/C, transit, insurance all labour charges and taxes and duties
RC -2-S.N.9
etc, complete
a 50mm dia 1 x 1 1 Nos 255.00 1 Nos
11 Supply and delivery of Gate Valves leaded in tin bronze screwed internal
bends, screwed on bonnet internal seat design to IS 778/ 84 with its
ammendments class - 2 of sizes ISI Marked including cost and conveyance,
transit insurance all labour charges and taxes and duties etc., complete.- RC -2-S.N.11

a 50mm dia 1 x 1 1 Nos 1825.00 1 Nos


12 Manufacture, Supply and fixing of Galvanised Mild steel couplings of the
RC -2-S.N.12
fallowing sizes
a 50mm dia 1 x 1 1 Nos 95.00 1 Nos
13 Supply & Delivery of 50mm Dia CI Non-return Valve with ISI Mark. including
cost and conveyance, transit insurance all labour charges and taxes and RC -2-S.N.13
duties etc., complete.
a 50mm dia 3 x 1 3 Nos 845.00 1 Nos
14 Supply & fixing of 50mm Dia MS Galvanised Bore Cover including cost and
conveyance, transit insurance all labour charges and taxes and duties etc., RC -2-S.N.14
complete
Bore cover 1 x 1 1 Nos 170.00 1 Nos
15 Supply and Delivery of MS Angular Stand for fixing of control Panel Board -
MS Angular stand consisting of L Angles of size 40mm x 40mm x 5mm with 2
nos. 6'long verticals and 3 nos. - 2 1/2' long horizontals. The two legs of the
stand firmly fixed in Cement Concrete bed in CC (1:2:4) prop. of size 1m x
0.3m x 0.2m depth below Ground Level. including cost and conveyance,
transit insurance all labour charges and taxes and duties etc., complete RC -2-S.N.15

Est-Borewells-1 2000
Page 2001 of 2191

S.N Description Nos L B D Qty Rate Per


MS Stand 1 x 1 1 Nos 1050.00 1 Nos

Est-Borewells-1 2001
Page 2002 of 2191

S.N Description Nos L B D Qty Rate Per


16 Providing independent Earthing for the Pumpset/ motor using 40mm dia B
class GI Pipe of 2m length duly providing 12mm dia 16nos holes and required
bolts, nuts and washers, check nuts humbe pipe ring etc., as per IS
specifications with necessary double GI wire no.8 SWG including filling with
equal proportion of salt and Charcoal in layers and all labour charges etc.,
complete. RC -2-S.N.16

Earthing 1 x 1 1 Nos 1700.00 1 Nos


17 Supply and Delivery of 7/20 Service Wire of repute make as per IS Code
including cost and conveyance, transit insurance all labour charges and taxes RC -2-S.N.17
and duties etc., complete.
7/20 Service wire - ISI marked 1 x 1 250.00 250.00 Rmt 17.00 1 Rmt
18 Supply and Delivery of 12" long GI NIPPLE including cost and conveyance, RC -2-S.N.18
transit insurance all labour charges and taxes and duties etc., complete.
a 50mm dia [ TBSP-G.II-06 ] 1 x 1 1 Nos 120.00 1 Nos
19 Installation, Testing, Trail Run and Commissioning of Submersible Pumps set RC -2-S.N.19
with all accessories as per the standard specifications.
Commissioning and testing (Q ) 1 x 1 1 Jobs 2450.00 1 Jobs
B Laying GI Lines
20 RBR-FNDN-1: Earthwork in excavation in all types of soils for pipeline
trenches as per specification drawings and as directed by the departmental
officer and protecting the walls and other structures etc.,so as not to disturb
the existing utility services i.e water spply and sewer pipe lines ,telephone,
and power supply cables/ducts,strom water drains, traffic signals etc., during
laying of Pipe lines taking all precautionary measures in the restricted areas
for laying sewer/watermains including divertion of traffic and backfilling in
trenches with excavated suitable material and and disposal of remaining
earth upto a lead of 50 m, including all incidental and operational charges
etc., complete for Pipe Lines,
data-bld -
Sn-7
from bore wells to Cisterns 1 x 1 Err:509 0.45 0.75 Err:509 Cum 210.92 1 Cum

Est-Borewells-1 2002
Page 2003 of 2191

S.N Description Nos L B D Qty Rate Per


21 Supply of Galvanised Mild steel pipes (Medium class of the followingt nominal
more confirming to IS 1239/ Part-1/1990 continuoulsy welded ERW?HFTW,
Type and screwd at both ends as per IS 554 one end fitted with Socket
( Heavy class) as per IS 1239/ part-11/1992 and other end fitted with plastic
Ring and delivery in small quantities at work site of pump installation with
replacement guarantes for a period of six month on istallation (Good indian
make with ISI mark for exact lengths of 3 meters + 5% including cost,
conveyance, Central Excise duty and sales Tax etc., complete for every meter
as per ISI spectification of wall thickness and weight of pipe.
data - water
suply
50mm dia GI pipe 1 x 1 Err:509 Err:509 Rmt 486.27 1 Rmt
20mm dia GI pipe 1 x 1 Err:509 Err:509 Rmt 215.87 1 Rmt

Say Rs.

Est-Borewells-1 2003
Page 2004 of 2191

PET MUNICIPALITY

#REF!

Estimate for Drilling of Borewells


Amount

27450.00
40260.00

#REF!

Est-Borewells-1 2004
Page 2005 of 2191

Amount
15700.00

Est-Borewells-1 2005
Page 2006 of 2191

Amount

6110.00

180.00

13530.00

Est-Borewells-1 2006
Page 2007 of 2191

Amount

#REF!

Est-Borewells-1 2007
Page 2008 of 2191

Amount

360.00

390.00

255.00

1825.00

95.00

2535.00

170.00

Est-Borewells-1 2008
Page 2009 of 2191

Amount
1050.00

Est-Borewells-1 2009
Page 2010 of 2191

Amount

1700.00

4250.00

120.00

2450.00

Err:509

Est-Borewells-1 2010
Page 2011 of 2191

Amount

Err:509
Err:509
Err:509
Err:509
Err:509

Est-Borewells-1 2011
Page 2012 of 2191

KODADA MUNICIPALITY
#REF!

Detailed and Abstract Estimate for Rain Water Harvesting Structure


S.No Description of Work Nos Length Width Depth Quantity Rate Per
1 BLD-CSTN-2-2(10) : Earth work excavation for foundations and
depositing on bank for all lifts and with an initial lead of 10m including
all operational, incidental, labour charges such as shoring ,sheeting,
planking, strutting, etc. complete for finished item of work including
seigniorage excluding dewatering charges etc as per SS - 20 B (APSS data-
308). RWHS- Sn-
2
for recharge pit 1 x 1 2.00 2.00 2.00 8.00
for Brick work around the pit - Long walls 1 x 2 3.46 0.30 0.40 0.83
for Brick work around the pit - Short walls 1 x 2 3.00 0.30 0.40 0.72
Total Qty 9.55 Cum #REF! 1 Cum
2 BLD-CSTN-2-8 (16) :Supply, Filling and packing Rough / soling stone
in readymade trench icluding cost and conveyance of all material and
all labour charges etc for water harvesting structure., for finished item data-
RWHS- Sn-
of work. (APSS NO. 309 & 310) 6
1 x 1 2.00 2.00 1.00 4.00 Cum #REF! 1 Cum
3 BLD-CSTN-2-8 (16) :Supply, Filling 65mm metal in readymade trench
icluding cost and conveyance of all material and all labour charges etc
for water harvesting structure., for finished item of work. (APSS NO. data-
RWHS- Sn-
309 & 310) 7
1 x 1 2.00 2.00 0.50 2.00 Cum #REF! 1 Cum
4 BLD-CSTN-2-8 (16) :Supply, Filling 40mm metal in readymade trench
icluding cost and conveyance of all material and all labour charges etc
for water harvesting structure., for finished item of work. (APSS NO. data-
RWHS- Sn-
309 & 310) 8
1 x 1 2.00 2.00 0.25 1.00 Cum #REF! 1 Cum
5 BLD-CSTN-2-8 (16) :Supply, Filling 20mm metal in readymade trench
icluding cost and conveyance of all material and all labour charges etc
for water harvesting structure., for finished item of work. (APSS NO. data-
RWHS- Sn-
309 & 310) 9
1 x 1 2.00 2.00 0.25 1.00 Cum #REF! 1 Cum

RWHS- 447524687.xlsx 2012


Page 2013 of 2191

S.No Description of Work Nos Length Width Depth Quantity Rate Per
6 Supply, Filling Sand in readymade trench including cost and
conveyance of all material and all labour charges etc for water
harvesting structure in complete shape.
1 x 1 3.00 3.00 0.25 2.25 Cum #REF! 1 Cum

RWHS- 447524687.xlsx 2013


Page 2014 of 2191

S.No Description of Work Nos Length Width Depth Quantity Rate Per
7 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain
Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded
Metal including cost and conveyance of all materials like cement, sand,
coarse aggregate water etc., to site , seigniorage charges on all
materials, labour charges , for mixing , laying, concrete , ramming in
15 cm layers, finishing top surface to the required level curing etc.,
complete for finished item of work with nomonal reinforcement

CC Bed below Brick wall - Below Long walls 1 x 2 3.46 0.30 0.05 0.10
CC Bed below Brick wall - Below Short walls 1 x 2 2.00 0.30 0.05 0.06
0.16 Cum 5044.84 1 Cum
8 BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or
treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost
& conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to
site cost of Seigniorage charges on all materials, including all labour
charges like mixing Cement Mortor, scaffoding charges lift charges ,
curing charges etc., complete for finished item of work

Brick Walls - Long walls 1 x 2 3.46 0.23 0.70 1.11


1 x 2 2.00 0.23 0.70 0.64
Deduction for openings at 4 sides above GL -1 x 4 0.46 0.23 0.10 -0.04
1.71 Cum 5455.18 1 Cum
9 BLD-CSTN-8-2-(77) : Plastering with 12mm thick in single coat in CM
(1:4) finished smooth including cost and conveyance of all materials to
site, seigniorage charges on all materials, finishing, curing, scaffolding
and all operational, incidental, labour charges etc., including cutting
grooves where ever necessary etc., complete for finished item of work.
(As per SS 903). per 10 Sqm.

Inner side - Long walls 1 x 2 3.00 0.60 3.60


Inner side - Short walls 1 x 2 2.40 0.60 2.88
Outer side - Long walls 1 x 2 3.46 0.10 0.69
Outer side - Short walls 1 x 2 3.00 0.10 0.60
Top facing of Long wall 1 x 2 3.46 0.23 1.59
Top facing of Short wall 1 x 2 3.00 0.23 1.38
10.74 Sqm 1507.50 10 Sqm

RWHS- 447524687.xlsx 2014


Page 2015 of 2191

S.No Description of Work Nos Length Width Depth Quantity Rate Per
10 BLD-CSTN-3-16-(31)-C; Supply and placing of the M-20 Design Mix
Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER
with 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site and including Seigniorage charges, sales & other taxes on
all materials including all operational, incidental and labour charges
such as weigh batching, machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for
finished item of work (APSS No. 402)with minimum cement content as
per IS code from standard suppliers approved by the department
including pumping, centering, shuttering, laying concrete, vibrating,
curing etc. complete but excluding cost of steel and its fabrication
charges for finished item of work. for RCC SLABS, BEAMS

RCC Precast Perforated Slabs of 100mm thick 1 x 1 3.00 3.00 0.10 0.90 Cum 11093.79 1 Cum
11 BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/
Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe
415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC
works , including labour charges for straightening, cutting, bending to
required sizes and shapes, placing in position with cover blocks of
approved materials and size and tying and lap-splicing with binding
wire of 18 SWG, forming grills for reinforcement work as per approved
designs and drawings, including cost and conveyance of steel bars,
including all wastages such as overlaps, couplings, chairs, spacer bars
including cost and conveyance of binding wire, cover blocks and all
incidental, operational, labour charges such as cutting, bending,
placing in position, tying including sales and other taxes on all materials
etc., complete for finished item of work in all floors.( APSS No.126

for RCC Precast Perforated Slabs @ 40 Kg/Cum 1 x 1 0.090 50.00 Kg/Cum 4.50 Kg 68.71 1 Kg

RWHS- 447524687.xlsx 2015


Page 2016 of 2191

ODADA MUNICIPALITY
#REF!

timate for Rain Water Harvesting Structure


Amount

#REF!

#REF!

#REF!

#REF!

#REF!

RWHS- 447524687.xlsx 2016


Page 2017 of 2191

Amount

#REF!

RWHS- 447524687.xlsx 2017


Page 2018 of 2191

Amount

807.00

9328.00

1619.00

RWHS- 447524687.xlsx 2018


Page 2019 of 2191

Amount

9984.00

309.00
#REF!
#REF!

RWHS- 447524687.xlsx 2019


KODADA MUNICIPALITY

Devlopment of Park near Municipal Office in


Nalgonda Municipality of Telangana State

GENERAL ABSTRACT

S.No Description of Items Quantity

1 Development of Greenary and Childern's Play Area 830.00 Sqm

2 Laying of interlocking tiles for Pathways 330 Rmt

3 Providing Rain Water Hervesting Structures 10 Nos

Sub-Total. A Rs.

4 Add VAT @ 5%

5 Add Labour Cess @ 1%

6 Provision towards QC @ 1%

7 Provision towards NAC @ 0.1%

8 Provision towards seiniorage charges


Provision towards Consultancy charges for Preparation of DPRs @
9
1.5%
10 L.S for Unforseen items and including Garbage Bins

Sub-Total. B Rs.

Total Project Cost ( A+B ) Rs.

Say Rs.
Amount in Rs.

571347.00

1090239.00

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
Page 2022 of 2191

KODADA MUNICIPALITY
Construction of Toilets
ABSTRACT AND DETAILED ESTIMATE
S.N. Description of Item Nos L B D Quantity Rate Per
A EWE for footings : A1,B1,A2,B2 1 x 4 1.30 1.30 1.80 12.17
12.17 Cum
1 RBR-FNDN-1-A-i -manual means : Earthwork excavation for structures in all types of
soils up to 3.00 Mts depth below GL as per drawing and technical specifications
including setting out, construction of shoring and bracing, removal of stumps and
other deleterious material and disposal upto a lead of 50 m, dressing of sides and
bottom and backfilling in trenches with excavated suitable material as per Technical Bld up to 3F
Specification 305 MORD / 304 MORTH. for Sumps,Thrust blocks, Chambers and S.No 7
Man
in all Holes etc.
types of by manual
soils means,
for footings 80 % 9.74 Cum 221.47 1 Cum
2 BLD-CSTN-2-7 - (15) - Hard rock (blasting prohibited)-Upto 3 m depth
Earth work excavation and depositing on bank for all lifts and with an initial lead of
10m including all operational, incidental, labour charges such as shoring ,sheeting,
planking, strutting, etc. complete for finished item of work including seigniorage
excluding dewatering charges etc as per SS - 20 B (APSS 308). Bld up to 3F
S.No 6
in Hard rocky soils 20 % 2.43 Cum 1893.14 1 Cum
B Earth work excavation for fundation of Walls
Toilet - long walls 1 x 2 4.90 0.45 0.40 1.76
Toilet - short walls 1 x 3 3.02 0.45 0.40 1.63
Toilets - inner short walls 1 x 2 1.93 0.45 0.40 0.69
Toilets - inner Long walls 1 x 1 5.05 0.45 0.40 0.91
4.99 Cum
3 BLD-CSTN-2-1 (9): Earth work excavation for foundations and depositing on bank
for all lifts and with an initial lead of 10m including all operational, incidental, labour
charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item
of work including seigniorage excluding dewatering charges etc as per SS - 20 B
(APSS 308). Bld up to 3F
S.No 1
in all types of soils 80 % 3.99 Cum Err:509 1 Cum

Toilets- (2) -447524687.xlsx 2022


Page 2023 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


4 BLD-CSTN-2-7 - (15) - Hard rock (blasting prohibited)-Upto 3 m depth : Earth work
excavation and depositing on bank for all lifts and with an initial lead of 10m
including all operational, incidental, labour charges such as shoring ,sheeting,
planking, strutting, etc. complete for finished item of work including seigniorage
excluding dewatering charges etc as per SS - 20 B (APSS 308). Bld up to 3F
S.No 6
in Hard rocky soils 20 % 1.00 Cum 1893.14 1 Cum

Toilets- (2) -447524687.xlsx 2023


Page 2024 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


5 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level : Plain
Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse
aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost
and conveyance of all materials like cement, sand, coarse aggregate water etc., to
site , seigniorage charges on all materials, labour charges , for mixing , laying,
concrete , ramming in 15 cm layers, finishing top surface to the required level curing
etc., complete for finished item of work.for foundation and under flooring bed. Bld up to 3F
S.No 12
a For Footings
Footings : A1,B1,A2 & B2 1 x 4 1.30 1.30 0.15 1.01
Foundations
Toilet - long walls 1 x 2 4.90 0.45 0.10 0.44
Toilet - short walls 1 x 3 3.02 0.45 0.10 0.41
Toilets - inner short walls 1 x 2 1.93 0.45 0.10 0.17
Toilets - inner Long walls 1 x 1 5.05 0.45 0.10 0.23
2.26 Cum
b for Flooring Bed
Toilets Front area 1 x 2 2.51 0.88 0.075 0.33
Toilets Gents & Ladies 2 x 2 1.93 1.18 0.075 0.68
1.01 Cum
Total a + b 3.27 Cum 3785.55 1 Cum
6 BLD-CSTN-2-9 (17): Filling with useful available excavated earth (excluding rock) in
trenches, sides of foundations and basement with initial lead in layers not exceeding
15 cm thick, consolidating each deposited layer by watering and ramming including
cost and conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work. (APSS NO.
309 & 310) Bld up to 3F
S.No 10
for filling basement
Toilets Front area 1 x 1 2.51 0.88 0.225 0.50
Toilets Gents & Ladies 1 x 2 1.93 1.18 0.225 1.02
1.52 Cum 29.94 1 Cum

Toilets- (2) -447524687.xlsx 2024


Page 2025 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


7 BLD-CSTN-3-14-(31) - A : Supply and placing of the M-20 Design Mix Concrete
corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (sand)
coarse aggregate, water etc., to site and including Seigniorage charges, sales &
other taxes on all materials including all operational, incidental and labour charges
such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS
No. 402)with minimum cement content as per IS code fo FOUNDATIONS, PLINTH,
PEDESTALS Bld up to 3F
S.No 19
a for Footings
Footings : A1,B1,A2 & B2 1 x 4 1.10 1.10 0.30 1.45
Total 1.45 Cum 7923.65 1 Cum
b for Pedastals
1 x 4 0.40 0.40 0.60 0.38
0.38 Cum 9665.14 1 Cum
c Plinth Beams
Toilet - long walls 1 x 2 4.90 0.23 0.30 0.68
Toilet - short walls 1 x 3 3.02 0.23 0.30 0.63
1.31 Cum 11576.60 1 Cum
8 BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-20 Design Mix Concrete
corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (sand)
coarse aggregate, water etc., to site and including Seigniorage charges, sales &
other taxes on all materials including all operational, incidental and labour charges
such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS
No. 402)with minimum cement content as per IS code for COLUMNS, LINTELS,
WATER TANKS, RCC WALLS IN BUILDINGS Bld up to 3F
S.No 20
a C1 Coloumns Up to Ground level 1 x 4 0.23 0.30 0.75 0.21
C1 Columns above GL and up to roof level 1 x 4 0.23 0.30 3.30 0.91
1.12 Cum 11959.00 1 Cum
b Lintels

Toilets- (2) -447524687.xlsx 2025


Page 2026 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


over D1 Doors 1 x 2 1.20 0.23 0.20 0.11
over D2 Doors 1 x 4 1.05 0.23 0.20 0.19
ventilators 1 x 4 0.90 0.23 0.20 0.17
0.47 Cum 12006.04 1 Cum

Toilets- (2) -447524687.xlsx 2026


Page 2027 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


9 BLD-CSTN-3-16-(31)-C: Supply and placing of the M-20 Design Mix Concrete
corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (sand)
coarse aggregate, water etc., to site and including Seigniorage charges, sales &
other taxes on all materials including all operational, incidental and labour charges
such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS
No. 402)with minimum cement content as per IS code from standard suppliers
approved by the department including pumping, centering, shuttering, laying
concrete, vibrating, curing etc. complete but excluding cost of steel and its
fabrication charges for finished item of work. for RCC SLABS, BEAMS
Bld up to 3F
S.No 21-B
a 115mm thick roof slab GF
Toilets 1 x 1 5.50 3.48 0.115 2.20
or Say 2.20 Cum 5969.75 1 Cum
b Roof Beams
Toilet - long walls 1 x 2 4.90 0.23 0.30 0.68
Toilet - short walls 1 x 2 3.02 0.23 0.30 0.42
1.10 Cum 10500.72 1 Cum
10 BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop
using hard granite stone including cost & Conveyance of all materials like Cement,
Sand , Water, Granite Stones, including Seigniorage Charges on all Materials,
,labour charges for cutting Stones to required size and shape, mixing of Cement
Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of
Work . Bld up to 3F
S.No 28
Below Ground Level
Toilet - long walls 1 x 2 4.90 0.45 0.30 1.32
Toilet - short walls 1 x 3 3.02 0.45 0.30 1.22
Toilets - inner short walls 1 x 2 1.93 0.45 0.30 0.52
Toilets - inner Long walls 1 x 1 5.05 0.45 0.30 0.68
3.74 Cum #REF! 1 Cum

Toilets- (2) -447524687.xlsx 2027


Page 2028 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


11 BLD-CSTN-6-6-(61) : Construction of CRS Masonary 2nd Sort in Cement Mortor
( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials
like Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all
Materials, ,labour charges for cutting Stones to required size and shape, mixing of
Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished
Above GL for. for
item of Work Base ment
Base ment.
Partion wall 1 x 1 3.02 0.30 0.30 0.27
Toilets - inner short walls 1 x 2 1.93 0.30 0.30 0.35
Toilets - inner Long walls 1 x 1 5.05 0.30 0.30 0.45
or Say 1.07 Cum 4074.46 1 Cum
12 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level: Plain Cement
concrete nominal mix m-20 (Cement : fine aggregate: coarse aggregate ) using
12mm size Hard Granite Machine Crushed Graded Metal including cost and
conveyance of all materials like cement, sand, coarse aggregate water etc., to site ,
seigniorage charges on all materials, labour charges , for mixing , laying, concrete ,
ramming in 15 cm layers, finishing top surface to the required level curing etc.,
complete for finished item of work with nomonal reinforcement Bld up to 3F
S.No 18
Bed blocks for fixing of Doors 6 x 6 0.20 0.23 0.10 0.17
0.17 Cum #REF! 1 Cum
13 BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size
23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all
Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges
on all materials, including all labour charges like mixing Cement Mortor, scaffoding
charges lift charges , curing charges etc., complete for finished item of work Bld up to 3F
S.No 31
Toilet - long walls 1 x 2 4.90 0.23 2.83 6.37
Toilet - short walls 1 x 3 3.02 0.23 2.83 5.89
Deductions
over D1 Doors -1 x 2 0.90 0.23 1.98 -0.82
ventilators -1 x 4 0.60 0.23 0.45 -0.25
11.19 Cum #REF! 1 Cum
14 BLD-CSTN-5-11 (49) : 11.5 cm wide Brick masonry for super-structure on ground
floor in cm (1:3) using second class traditional size bricks including cost of all
materials, seigniorage charges, labour and all operations for constructing half brick
masonry, mixing cement mortar, curing etc., complete for finished item of work, but Bld up to 3F
excluding conveyance charges of materials. S.No 33

Toilets- (2) -447524687.xlsx 2028


Page 2029 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


Partion wall 1 x 1 3.02 3.19 9.62
Toilets - inner short walls 1 x 2 1.93 3.19 12.29
Toilets - inner Long walls 1 x 1 5.05 3.19 16.08
Deduction for openings
over D2 Doors -1 x 4 0.75 1.98 -5.94
32.05 sqm 6962.33 10 sqm
15 BLD-CSTN-8-7-(82) : Plastering with 20mm thick in single coat in CM (1:4) finished
smooth including cost and conveyance of all materials to site, seigniorage charges
on all materials, finishing, curing, scaffolding and all operational, incidental, labour
charges etc., including cutting grooves where ever necessary etc., complete for Bld up to 3F
finished item of work. (As per SS 903). per 10 Sqm. S.No 36
Outer walls
Toilet - long walls 1 x 2 3.36 3.30 22.18
Toilet - short walls 1 x 2 2.78 3.30 18.35
or Say 40.53 Sqm 2322.92 10 Sqm
16 BLD-CSTN-8-2-(77): Plastering with 12mm thick in single coat in CM (1:4) finished
smooth including cost and conveyance of all materials to site, seigniorage charges
on all materials, finishing, curing, scaffolding and all operational, incidental, labour
charges etc., including cutting grooves where ever necessary etc., complete for
Bld up to 3F
finished item of work. (As per SS 903).
S.No 34
Inner walls
Toilets Front area 1 x 2 2.51 0.880 2.88 19.49
Toilets Gents & Ladies 2 x 2 1.93 1.180 2.88 35.77
Deduction for openings
Doors D1 -1 x 2 0.90 1.98 -3.56
Doors D2 -1 x 4 0.75 1.98 -5.94
ventilators -1 x 4 0.60 0.45 -1.08
44.68 Sqm 1507.50 10 Sqm
17 BLD-CSTN-8-1-(76):Plastering with 12mm thick in single coat in CM (1:3) finished
smooth including cost and conveyance of all materials to site, seigniorage charges
on all materials, finishing, curing, scaffolding and all operational, incidental, labour
charges etc., including cutting grooves where ever necessary etc., complete for
finished item of work. (As per SS 903). per 10 Sqm.Ceiling Bld up to 3F
S.No 33

Toilets- (2) -447524687.xlsx 2029


Page 2030 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


Toilets Front area 1 x 2 2.51 0.88 4.42
Toilets Gents & Ladies 2 x 2 1.93 1.18 9.11
Add for exposed faces of beams etc. 0.27
13.80 Sqm 1601.57 10 Sqm

Toilets- (2) -447524687.xlsx 2030


Page 2031 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


18 BLD-CSTN-11-4- (161): White washing Two coat with whiting of approved quality to
give an even shade after thoroughly brushing the surface to remove all dirt and
remains of loose powdered materials including cost of all materials, labour charges
and incidental such as scaffolding, lift charges etc., complete for finished item of
work. Bld up to 3F
S.No 56
Qty as per ceiling & inne rplastering 58.48 Sqm 250.11 10 Sqm
19 BLD-CSTN-11-8-(164): Colour washing two coats with approved Colour and quality
to give an even shade after thoroughly brushing the surface to remove all dirt and
remains of loose powdered materials including cost of all materials, labour charges
and incidental such as scaffolding, lift charges etc., complete for finished item of
work, but excluding conveyance charges of materials Bld up to 3F
S.No 57
Qty as per external wall plastering 40.53
40.53 Sqm 584.62 10 Sqm
20 BLD-CSTN-10-25-(148):Providing impervious coat to exposed RCC roof slab
surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of
cement laid over roof when it is green including cost of all materials, seigniorage
charges, excluding conveyance charges of materials and including all operational,
incidental and labour charges for mixing mortar, laying, rendering smooth and thread
lining, curing, rounding off junctions of wall and slab etc,, complete for finished item
of work Bld up to 3F
S.No 51
Qty as per Slab area 58.48 Sqm 4616.35 10 Sqm
21 BLD-CSTN-4-1-(34): Providing High Yield Strength Deformed (HYSD)/ Thermo
Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as
per IS 1786-1979) of different diameters for RCC works , including labour charges
for straightening, cutting, bending to required sizes and shapes, placing in position
with cover blocks of approved materials and size and tying and lap-splicing with
binding wire of 18 SWG, forming grills for reinforcement work as per approved
designs and drawings, including cost and conveyance of steel bars, including all
wastages such as overlaps, couplings, chairs, spacer bars including cost and
conveyance of binding wire, cover blocks and all incidental, operational, labour
charges such as cutting, bending, placing in position, tying including sales and other
taxes on all materials etc., complete for finished item of work in all floors.( APSS
No.126 Bld up to 3F
S.No 22
Footings and pedastals 1.83 25.00 Kg/Cum 45.75
Columns 1.12 110.00 Kg/Cum 123.20
Plinth Beams 1.31 70.00 Kg/Cum 91.70

Toilets- (2) -447524687.xlsx 2031


Page 2032 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


Roof Beams 1.10 100.00 Kg/Cum 110.00
Lintels 0.47 40.00 Kg/Cum 18.80
120mm Thick Slabs 2.20 80.00 Kg/Cum 176.00
Total 565.45 Kgs
Or Say 0.57 MTs 50924.00 1 MTs

Toilets- (2) -447524687.xlsx 2032


Page 2033 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


22 TBSC-L.I-11: Providing and fixing door frames fabricated from sections made of
galvanized steel powder coated (base steel as per IS 513, galvanised as per IS 277
with zinc of 120 grams / square metre), the factory made section are powder coated
with pure polyester powder of 50-60 microns thick with total coated thickness of 1.25
mm, size of door frame section is of 105 x 60 mm with a rebate of 38 mm to
accommodate 35 mm thick door shutter, with groove to insert gasket in the frame
section, frame section filled with polyurethane foam, cut to length, and joined by way
of welding, each frame provided with: a) 2mm thick MS powder coated butt hinges of
100 mm long – 3 Nos. for single shutter, 6 Nos. for double shutter. b) CRCA
electroplates stiffeners of 6 Nos. – 3 in each vertical. c) 40 mm x 200 mm x 1.2 mm
hold fasts screwed to stiffeners – 6 Nos. with split end tail. d) Nylon Aldrop Receiver
– 1 No. for single shutter frame. e)Tie Rod – 1 No
Bld - data-
S.No 111
Doors D1 1 x 2 4.860 9.72
9.72 Rmt 781.67 1 Rmt
23 Supply and fixing of 25 mm thick Flush Door shutter solid bond wood block board
type with commercial ply on both faces with 1no. 300 mm long Aldrop, 2 nos. 125
mm lond door handle, 1 no. 150 mm long tower bolt, 1 no. 250 mm long door latch
1 No. door stopper ( all fixturs MS Powder coated ) including c/c of all materials and
labour chrges etc., complete Bld - data-
S.No 112
Doors D1 1 x 2 0.900 1.980 3.56
3.56 Sqm 1579.20 1 Sqm
24 TBSC-L.III-03: Providing and fixing 30mm thick FACTORY MADE SOLID SINGLE
SIDE PRELAM PANEL PVC DOOR SHUTTER consisting of frame made out of MS.
Tubes of 19gauge thickness and size of 19mmX19mm for stiles, and 15mmX15mm
for top and bottom rails. The MS. Frame shall have a coat of steel primers of
approved make and anufacture. MS. Frame covered with 5mm thick heat molded
single side Prelam Pac ‘C’ channel of size 30mmX50mm to form stiles.5mm thick&
75mm wide single side prelim Pac sheets shall be for the top, bottom and lock rails.
Paneling of 5mm thick one side Pac sheet to be fitted in the MS. Frame and sealed
to the front (prelam side) stiles and rails (which should have a 5mm 45 bent portion
as beading) and attached to the back(white/ivory) stiles and rails which should have
a 10mm 900 bent portion as beading ) using 2nos. 15mm wide X 5mm thick Pac
sheet beading inside the 90 bent beading. All stiles, rails and beadings are to be
joined to the panel using solvent cement etc. an additional 5mm thick Pac strip of
20mm width to be stuck on the interior side of the ‘C” channel using Pac solvent
cement adhesive and 10mm(5mmX2) thick, 20mm wide cross Pac sheet to be fitted
as gap insert for top and bottom rail etc. complete as per direction of Engineer –in-
Charge, manufacture specification and drawing.

Toilets- (2) -447524687.xlsx 2033


Page 2034 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


Door D2 1 x 4 0.750 1.980 5.94 Sqm 2524.53 1 Sqm
25 BLD-CSTN-9-6-(104) : Flooring with ceramic tiles (Non skid type), set over base
coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab,
including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm &
jointed neatly with white cement paste to full depth mixed with pigment of matching
shade, including cost of all materials like cement, sand water and tiles etc.,
complete, for finished item of work, but excluding the cost of conveyance of all
materials. (For Toilets)

. Toilets Front area 1 x 2 2.51 0.88 4.42


Toilets Gents & Ladies 2 x 2 1.93 1.18 9.11
add for steps etc 0.14
13.67 Sqm 8089.46 10 Sqm
26 Supplying and fixing of 7.5mm thick Aluminium Grill (as approved by the
department) 3.58 Kg/Sqm.including cost and conveyance of all material and all
labour charges etc, complete.
ventilators 1 x 4 0.60 0.45 1.08
1.08 sqm 1146.38 1 sqm

Toilets- (2) -447524687.xlsx 2034


Page 2035 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


26 BLD-CSTN-9-18-(116) : Dadooing to walls with Glazed colour tiles of any size 1st
quality set over a base coat of CM(1:3) Prop. 12mm thick and neat Gray cement
slurry of Honey like consistancy sread at the rate of 3.30 Kg of cement per One
Square Meter and jointed wiyh neat White cement paste mixed with pigmant of
matching shade including cost and conveyance of all materials like cement, sand,
water, flooring Tiles etc. to site, all operational, incidental and labour charges such
as mixing of cement mortar, laying, jointing, curing, lift charges etc., complete for
finished item of work (for toilets)

Toilets Front area 2 x 2 2.51 0.88 1.200 16.27


Toilets Gents & Ladies 2 x 4 1.93 1.18 1.200 29.86
Deductions
Doors D1 -1 x 2 0.90 1.980 -3.56
Doors D2 -1 x 4 0.75 1.980 -5.94
36.62 sqm 5464.68 10 sqm
Total of - A
Add for Sanitary and WS works @ 7.5%
Add for Electrification @ 5%

Total Rs.
Total Cost Say Rs.

Toilets- (2) -447524687.xlsx 2035


Page 2036 of 2191

A MUNICIPALITY
uction of Toilets
D DETAILED ESTIMATE
Amount

2157.00

4600.00

Err:509

Toilets- (2) -447524687.xlsx 2036


Page 2037 of 2191

Amount

1893.00

Toilets- (2) -447524687.xlsx 2037


Page 2038 of 2191

Amount

12379.00

46.00

Toilets- (2) -447524687.xlsx 2038


Page 2039 of 2191

Amount

11489.00

3673.00

15165.00

13394.00

Toilets- (2) -447524687.xlsx 2039


Page 2040 of 2191

Amount

5643.00

Toilets- (2) -447524687.xlsx 2040


Page 2041 of 2191

Amount

13133.00

11551.00

#REF!

Toilets- (2) -447524687.xlsx 2041


Page 2042 of 2191

Amount

4360.00

#REF!

#REF!

Toilets- (2) -447524687.xlsx 2042


Page 2043 of 2191

Amount

22314.00

9415.00

6736.00

Toilets- (2) -447524687.xlsx 2043


Page 2044 of 2191

Amount

2210.00

Toilets- (2) -447524687.xlsx 2044


Page 2045 of 2191

Amount

1463.00

2369.00

26996.00

Toilets- (2) -447524687.xlsx 2045


Page 2046 of 2191

Amount

29027.00

Toilets- (2) -447524687.xlsx 2046


Page 2047 of 2191

Amount

7598.00

5622.00

Toilets- (2) -447524687.xlsx 2047


Page 2048 of 2191

Amount
14996.00

11058.00

1238.00

Toilets- (2) -447524687.xlsx 2048


Page 2049 of 2191

Amount

20014.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

Toilets- (2) -447524687.xlsx 2049


Page 2050 of 2191

KODADA MUNICIPALITY
Construction of Park behind Sai Techno School at APHB Colony
Providng Jogging Tracks
S.N. Description of Item Nos L B D Quantity Unit Rate Per
1 RBR-FNDN-1 -manual means : Earthwork excavation for structures in all types of soil as
per drawing and technical specifications including setting out, construction of shoring
and bracing, removal of stumps and other deleterious material and disposal upto a lead
of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable
material as per Technical Specification 305 MORD / 304 MORTH. for Sumps,Thrust Data- Bld,
S.No. 7
blocks, column pits, Chambers and Man Holes etc. by manual means,
2m wide Jogging Tracks 1 x 1 330.00 2.40 0.20 158.40
1m wide Pathways 1 x 1 17.00 1.40 0.20 4.76
163.16 Cum 210.92 1 Cum
2 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and basement
with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer
by watering and ramming including cost and conveyance of water to work site and all
operational, incidental, labour charges, hire charges of T & P etc., complete for finished
item of work. (APSS NO. 309 & 310) Data- Bld -
10
2m wide Jogging Tracks 1 x 1 330.00 2.40 0.100 79.20
1m wide Pathways 1 x 1 17.00 1.40 0.100 2.38
81.58 Cum 910.40 1 Cum
3 BLD-CSTN-3-10- ( 27 ) Hand mixing: Plain Cement concrete nominal mix (1:3:6) prop
(Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine
Crushed Metal including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour charges , for
mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required
level curing etc., complete for finished item of work.for foundation and under flooring
bed.
2m wide Jogging Tracks 1 x 1 330.00 2.20 0.100 72.60
1m wide Pathways 1 x 1 17.00 1.20 0.100 2.04
74.64 Cum 4819.01 1 Cum
4 RBR-CCPV-13 - ii: Providing and Laying of Interlocking Concrete Block Pavements
using PHOENIX or equivalent high strength Cement Concrete interlocking Regular
Pavers of 50 mm thickness of M- 40 Grade of which top 12 mm thick shall be for colour
pigmentation with imported colours and white cement to get required reflective glazing
inclusive of all taxes - as per drawing and Technical Specification Clause 1504 MORD Data- Bld ,
S.No 38
2m wide Jogging Tracks 1 x 1 330.00 2.00 660.00

447524687.xlsx Jogging tracks-


Page 2051 of 2191

S.N. Description of Item Nos L B D Quantity Unit Rate Per


1m wide Pathways 1 x 1 17.00 1.00 17.00
677.00 Sqm 570.70 1 Sqm

447524687.xlsx Jogging tracks-


Page 2052 of 2191

S.N. Description of Item Nos L B D Quantity Unit Rate Per


5 RBR-TSRA-29 : Cast in Situ Cement Concrete M20 Kerb: Construction of cement
concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in
M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm
projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation
concrete laid manually, all complete as per clause 408 MORTH Data- Bld ,
S.No 19
Curb wall as per requirement 1 x 2 330.00 660.00 Rmt 286.24 1 Rmt
6 BLD-CSTN-8-2-(77) ; Plastering with 12mm thick in single coat in CM (1:4) finished
smooth including cost and conveyance of all materials to site, seigniorage charges on
all materials, finishing, curing, scaffolding and all operational, incidental, labour charges
etc., including cutting grooves where ever necessary etc., complete for finished item of Data Bld
work. (As per SS 903). per 10 Sqm. S.No 42
outer sides of curb wall above GL 1 x 2 330.00 0.45 297.00
Total 297.00 Sqm 150.75 1 Sqm
7 Carting of surplus excavated rock from the site to a distance suitable including loading,
unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and
other incidental and operational charges etc., complete.
Carting of earth 31.68 Cum 57.10 1 Cum
Total
Total cost of the estimation Rs.
Say

447524687.xlsx Jogging tracks-


Page 2053 of 2191

Amount

34414.00

74270.43

359691.00

447524687.xlsx Jogging tracks-


Page 2054 of 2191

Amount

386364.00

447524687.xlsx Jogging tracks-


Page 2055 of 2191

Amount

188918.00

44773.00

1809.00
1090239.43
1090239.43
10.90 Lakhs

447524687.xlsx Jogging tracks-


Page 2056 of 2191

KODADA MUNICIPALITY
Construction of Park behind Sai Techno School at APHB Colony

Detailed and Abstract Estimate for Rain Water Harvesting Structure


S.No Description of Work Nos Length Width Depth Quantity Rate Per
1 BLD-CSTN-2-2(10) : Earth work excavation for foundations and
depositing on bank for all lifts and with an initial lead of 10m including
all operational, incidental, labour charges such as shoring ,sheeting,
planking, strutting, etc. complete for finished item of work including
seigniorage excluding dewatering charges etc as per SS - 20 B (APSS data-
308). RWHS- Sn-
2
for recharge pit 1 x 1 2.00 2.00 2.00 8.00
for Brick work around the pit - Long walls 1 x 2 3.46 0.30 0.40 0.83
for Brick work around the pit - Short walls 1 x 2 3.00 0.30 0.40 0.72
Total Qty 9.55 Cum #REF! 1 Cum
2 BLD-CSTN-2-8 (16) :Supply, Filling and packing Rough / soling stone
in readymade trench icluding cost and conveyance of all material and
all labour charges etc for water harvesting structure., for finished item data-
RWHS- Sn-
of work. (APSS NO. 309 & 310) 6
1 x 1 2.00 2.00 1.00 4.00 Cum #REF! 1 Cum
3 BLD-CSTN-2-8 (16) :Supply, Filling 65mm metal in readymade trench
icluding cost and conveyance of all material and all labour charges etc
for water harvesting structure., for finished item of work. (APSS NO. data-
RWHS- Sn-
309 & 310) 7
1 x 1 2.00 2.00 0.50 2.00 Cum #REF! 1 Cum
4 BLD-CSTN-2-8 (16) :Supply, Filling 40mm metal in readymade trench
icluding cost and conveyance of all material and all labour charges etc
for water harvesting structure., for finished item of work. (APSS NO. data-
RWHS- Sn-
309 & 310) 8
1 x 1 2.00 2.00 0.25 1.00 Cum #REF! 1 Cum
5 BLD-CSTN-2-8 (16) :Supply, Filling 20mm metal in readymade trench
icluding cost and conveyance of all material and all labour charges etc
for water harvesting structure., for finished item of work. (APSS NO. data-
RWHS- Sn-
309 & 310) 9
1 x 1 2.00 2.00 0.25 1.00 Cum #REF! 1 Cum

RWHS- 447524687.xlsx 2056


Page 2057 of 2191

S.No Description of Work Nos Length Width Depth Quantity Rate Per
6 Supply, Filling Sand in readymade trench including cost and
conveyance of all material and all labour charges etc for water
harvesting structure in complete shape.
1 x 1 3.00 3.00 0.25 2.25 Cum #REF! 1 Cum

RWHS- 447524687.xlsx 2057


Page 2058 of 2191

S.No Description of Work Nos Length Width Depth Quantity Rate Per
7 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain
Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded
Metal including cost and conveyance of all materials like cement, sand,
coarse aggregate water etc., to site , seigniorage charges on all
materials, labour charges , for mixing , laying, concrete , ramming in
15 cm layers, finishing top surface to the required level curing etc.,
complete for finished item of work with nomonal reinforcement

CC Bed below Brick wall - Below Long walls 1 x 2 3.46 0.30 0.05 0.10
CC Bed below Brick wall - Below Short walls 1 x 2 2.00 0.30 0.05 0.06
0.16 Cum 5044.84 1 Cum
8 BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or
treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost
& conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to
site cost of Seigniorage charges on all materials, including all labour
charges like mixing Cement Mortor, scaffoding charges lift charges ,
curing charges etc., complete for finished item of work

Brick Walls - Long walls 1 x 2 3.46 0.23 0.70 1.11


1 x 2 2.00 0.23 0.70 0.64
Deduction for openings at 4 sides above GL -1 x 4 0.46 0.23 0.10 -0.04
1.71 Cum 5455.18 1 Cum
9 BLD-CSTN-8-2-(77) : Plastering with 12mm thick in single coat in CM
(1:4) finished smooth including cost and conveyance of all materials to
site, seigniorage charges on all materials, finishing, curing, scaffolding
and all operational, incidental, labour charges etc., including cutting
grooves where ever necessary etc., complete for finished item of work.
(As per SS 903). per 10 Sqm.

Inner side - Long walls 1 x 2 3.00 0.60 3.60


Inner side - Short walls 1 x 2 2.40 0.60 2.88
Outer side - Long walls 1 x 2 3.46 0.10 0.69
Outer side - Short walls 1 x 2 3.00 0.10 0.60
Top facing of Long wall 1 x 2 3.46 0.23 1.59
Top facing of Short wall 1 x 2 3.00 0.23 1.38
10.74 Sqm 1507.50 10 Sqm

RWHS- 447524687.xlsx 2058


Page 2059 of 2191

S.No Description of Work Nos Length Width Depth Quantity Rate Per
10 BLD-CSTN-3-16-(31)-C; Supply and placing of the M-20 Design Mix
Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER
with 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site and including Seigniorage charges, sales & other taxes on
all materials including all operational, incidental and labour charges
such as weigh batching, machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for
finished item of work (APSS No. 402)with minimum cement content as
per IS code from standard suppliers approved by the department
including pumping, centering, shuttering, laying concrete, vibrating,
curing etc. complete but excluding cost of steel and its fabrication
charges for finished item of work. for RCC SLABS, BEAMS

RCC Precast Perforated Slabs of 100mm thick 1 x 1 3.00 3.00 0.10 0.90 Cum 11093.79 1 Cum
11 BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/
Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe
415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC
works , including labour charges for straightening, cutting, bending to
required sizes and shapes, placing in position with cover blocks of
approved materials and size and tying and lap-splicing with binding
wire of 18 SWG, forming grills for reinforcement work as per approved
designs and drawings, including cost and conveyance of steel bars,
including all wastages such as overlaps, couplings, chairs, spacer bars
including cost and conveyance of binding wire, cover blocks and all
incidental, operational, labour charges such as cutting, bending,
placing in position, tying including sales and other taxes on all materials
etc., complete for finished item of work in all floors.( APSS No.126

for RCC Precast Perforated Slabs @ 40 Kg/Cum 1 x 1 0.090 50.00 Kg/Cum 4.50 Kg 68.71 1 Kg

RWHS- 447524687.xlsx 2059


Page 2060 of 2191

ODADA MUNICIPALITY
behind Sai Techno School at APHB Colony

timate for Rain Water Harvesting Structure


Amount

#REF!

#REF!

#REF!

#REF!

#REF!

RWHS- 447524687.xlsx 2060


Page 2061 of 2191

Amount

#REF!

RWHS- 447524687.xlsx 2061


Page 2062 of 2191

Amount

807.00

9328.00

1619.00

RWHS- 447524687.xlsx 2062


Page 2063 of 2191

Amount

9984.00

309.00
#REF!
#REF!

RWHS- 447524687.xlsx 2063


KODADA MUNICIPALITY

Development of Rajiv Park in Nalgonda Municipality, Under Amrut

GENERAL ABSTRACT

S.No Description of Items Quantity

1 Providing Entrance Gate 1 No

2 Construction of Toilets 2 No

3 Development of Greenary and Childern's Play Area 4845.00 sqm

4 Providing interlocking tiles for Jogging tracks 588.00 Rmt

5 Providng 6.00m wide Path way 438.00 Rmt

6 Providng 2.50m wide internal Pathways 715.00 Rmt

Sub-Total. A Rs.

7 Add VAT @ 5%

8 Add Labour Cess @ 1%

9 Provision towards QC @ 1%

10 Provision towards NAC @ 0.1%

11 Provision towards seiniorage charges


Provision towards Consultancy charges for Preparation of DPRs @
12
1.5%
13 L.S for Unforseen items and including Garbage Bins

Sub-Total. B Rs.

Total Project Cost ( A+B ) Rs.

Say Rs.
er Amrut

Amount in Rs.

113369.00

780138.00

970327.00

1607782.00

4058653.00

1926833.00

9457102.00

472855.00

94571.00

94571.00

9457.00

47286.00

141857.00

88114.00

948711.00

10405813.00

104.06 Lakhs
Page 2066 of 2191

KODADA MUNICIPALITY
Construction of Divider and central lighting
Development of Rajiv Park in Nalgonda Municipality, Under Amrut
DETAILED & ABSTRACT ESTIMATION
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
A Gate
Brick wall 1 x 1 3.94
Total length of Brick work at Gate 4.00 0.60 0.60 1.44
for gate Columns 1 x 2 1.10 0.60 0.60 0.79
2.23 Cum
1 BLD-CSTN-2-1 (9) : Earth work excavation for foundations and depositing on
bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308).

% of Total Qty 1 x 1 80% 2.00 Cum 369.10 1 Cum


2 BLD-CSTN-2-7 - (15) : Earth work excavation for foundations and depositing
on bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308).
% of Total Qty 1 x 1 20% 1.00 Cum 1893.14 1 Cum
3 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level :
Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate:
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work.for foundation and under flooring bed. Data- Bld -
12
Brick wall 1 x 1 4.00 0.6 0.10 0.24
for gate Columns 1 x 2 1.10 0.60 0.15 0.20
0.44 Cum 3785.55 1 Cum

447524687.xlsx-Entrance Gate- 2066


Page 2067 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
4 BLD-CSTN-3-13- ( 30 ) - A- Nominal mix: RCC M- 20 Nominal mix
(Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS
456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and
its fabrication charges for finished item of work, but including centering and
shuttering charges for FOUNDATIONS, PLINTH, PEDESTALS Data- Bld -
19.a,b
a Footings for Gate Columns 1 x 2 1.00 0.50 0.20 0.20 Cum 7930.76 1 Cum
b Pedastals for Gate Columns 1 x 2 0.60 0.60 0.25 0.18 Cum 8484.75 1 Cum
5 BLD-CSTN-3-13- ( 30 ) - B- Nominal mix: RCC M- 20 Nominal mix
(Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS
456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and
its fabrication charges for finished item of work, but including centering and
shuttering charges for COLUMNS, LINTELS, WATER TANKS, RCC WALLS
IN BUILDINGS - WOODEN SCAFFOLDING Data- Bld -
92
for Gate pillars 1 x 2 0.45 0.45 2.60 1.05 Cum 9973.53 1 Cum
6 BLD-CSTN-6-12-(67) : Construction of RR Masonary in Cement Mortor
( 1:8 ) Prop using hard granite stone including cost & Conveyance of all
materials like Cement, Sand , Water, Granite Stones, including Seigniorage
Charges on all Materials, ,labour charges for cutting Stones to required size
and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges
curing etc., complete for finished item of Work . Data- Bld -
31
For Foundations below GL
Brick wall 1 x 1 4.00 0.60 0.50 1.20
1.20 Cum 3470.13 1 Cum

447524687.xlsx-Entrance Gate- 2067


Page 2068 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
7 BLD-CSTN-5-4-(42) ; Brick Masonary 2nd Class Ground moulded or
treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost &
conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site
cost of Seigniorage charges on all materials, including all labour charges
like mixing Cement Mortor, scaffoding charges lift charges , curing charges
etc., complete for finished item of work Data- Bld -
25
Brick wall 1 x 1 4.00 0.230 0.91 0.84
Brick Pillars 1 x 2 0.45 0.450 2.60 1.05
Deduct Brick Pillars -1 x 2 0.45 0.230 0.91 -0.19
Net Qty 1.70 Cum 5455.18 1 Cum
8 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level
Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work with nomonal reinforcement Data- Bld -
18
Over Brick Wall 1 x 1 4.00 0.28 0.075 0.08
Coping on Columns & Brick Pillars 1 x 4 0.45 0.45 0.075 0.06
0.14 Cum 5044.84 1 Cum
9 BLD-CSTN-8-2-(77) : Plastering with 12mm thick in single coat in CM (1:4)
finished smooth including cost and conveyance of all materials to site,
seigniorage charges on all materials, finishing, curing, scaffolding and all
operational, incidental, labour charges etc., including cutting grooves where
ever necessary etc., complete for finished item of work. (As per SS 903). per
10 Sqm. Data- Bld -
36
for exposed faces of the Columns & Pillars - Rear Side 1 x 4 0.45 0.91 1.65
For ornmental work - pillars 1 x 4 0.25 2.30 2.30
1 x 4 0.68 0.15 0.41
1 x 4 0.55 0.15 0.34
3 x 4 0.55 0.08 0.50
For Brick wall 2 x 1 4.00 0.91 7.32
Deduct Brick Pillars -1 x 4 0.90 0.91 -3.29
9.23 Sqm 150.75 1 Sqm

447524687.xlsx-Entrance Gate- 2068


Page 2069 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
10 BLD-CSTN-11-5-(162) : White washing two coats with whiting of approved
quality to give an even shade after thoroughly brushing the surface to
remove all dirt and remains of loose powdered materials including cost of all
materials, labour charges and incidental such as scaffolding, lift charges etc.,
complete for finished item of work, but excluding conveyance charges of
materials Data- Bld -
59
Qty as per Plastering area excluding pillars 4.55
4.55 Sqm 38.97 1 Sqm
11 BLD-CSTN-11-8-(164) : Colour washing two coats with approved Colour and
quality to give an even shade after thoroughly brushing the surface to
remove all dirt and remains of loose powdered materials including cost of all
materials, labour charges and incidental such as scaffolding, lift charges etc.,
complete for finished item of work, but excluding conveyance charges of Data- Bld -
60
materials
Pillars
CladdingQty to External walls with Granite stone tiles 8 mm thick (mirror 1 x 4 0.45 2.60 4.68 Sqm 58.46 1 Sqm
12 polished of all shades) using cement compatible bonding agent having
acrylic emulsion base set over 12mm thick CM (1:3) base coat and neat grey
cement slurry of honey like consistency spread at the rate of 3.3 kg.s per
sq.mt including fixing with MS clits with anticorrosive coating hold fasts and
using Janatha paste and jointed with white cement paste mixed with pigment
of matching shade to match the shade of granite slabs including cost and
conveyance of all materials and water to work site, including cost of
seigniorage charges on all materials and all operational, incidental, and
labour charges such as mixing mortar, fixing in position, including lift
charges, curing, including cutting the brick masonry walls and redoing the Data- Bld -
same such that the top surface of tiles is to be flushed with plastered 70
surface
Claddingetc., complete&for
for Columns finished item of work.(APSS No.701 & 707)
Pillars 1 x 4 1.35 2.60 14.04
For Brick Wall 1 x 1 3.10 0.91 2.83
16.87 Sqm 1458.57 1 Sqm
13 Supply, fabrication and fixing in position of MS sections of Horizontal
member 20mm square bars of 2 Nos and Vertical member 20mm Sqare bars
c/c of 8" , for edges 2"X2" sq pipe in M.Sincluding fixing with 4 Nos of MS Z
holdfasts (2 on each side) duly making cutting brick masonry, fixing and
making to original surface neatly and painting gate with one coat of red oxide
primer including cost and conveyance of all materials,Locking arrangment,
Ornamental pieces etc ,cutting, bending, welding including all operational
charges and all labour charges etc., complete for finished item of work.
Data- Bld -
87

447524687.xlsx-Entrance Gate- 2069


Page 2070 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
Ms Gate ( Two Wings) 1 x 2 160.00 Kg 320.00
Add extra 32.00
352.00 Kg 90.00 1 Kg
14 Supplying and fixing of MS Grills as per Drawings including fixing with 4 Nos
of MS Z holdfasts (2 on each side) duly making cutting masonry, fixing and
making to original surface neatly and painting gate with one coat of red oxide
primer including cost and conveyance of all materials,Locking arrangment,
Ornamental pieces etc ,cutting, bending, welding including all operational
charges and all labour charges etc., complete for finished item of work. Data- Bld -
72
MS Grills for compound wall @ 85Kg/each 1 x 2 85.00 Kg/each 170.00 Kg 88.05 1 Kg
15 BLD-CSTN-4-1-(34): Providing High Yield Strength Deformed (HYSD)/
Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe
500 grade as per IS 1786-1979) of different diameters for RCC works ,
including labour charges for straightening, cutting, bending to required sizes
and shapes, placing in position with cover blocks of approved materials and
size and tying and lap-splicing with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and drawings, including cost
and conveyance of steel bars, including all wastages such as overlaps,
couplings, chairs, spacer bars including cost and conveyance of binding
wire, cover blocks and all incidental, operational, labour charges such as
cutting, bending, placing in position, tying including sales and other taxes on
all materials etc., complete for finished item of work in all floors.( APSS Bld up to
No.126 3F S.No 22
Footings and pedastals 0.38 30.00 Kg/Cum 11.40
Columns 1.05 100.00 Kg/Cum 105.00
Total 116.40 Kgs
Or Say 0.12 MTs 68714.00 1 MTs
Total
Say Rs.

447524687.xlsx-Entrance Gate- 2070


Page 2071 of 2191

ADA MUNICIPALITY
f Divider and central lighting
in Nalgonda Municipality, Under Amrut
& ABSTRACT ESTIMATION

Amount

738.00

1893.00

1666.00

447524687.xlsx-Entrance Gate- 2071


Page 2072 of 2191

Amount

1586.00
1527.00

10472.00

4164.00

447524687.xlsx-Entrance Gate- 2072


Page 2073 of 2191

Amount

9274.00

706.00

1391.00

447524687.xlsx-Entrance Gate- 2073


Page 2074 of 2191

Amount

177.00

274.00

24606.08

447524687.xlsx-Entrance Gate- 2074


Page 2075 of 2191

Amount

31680.00

14969.00

8246.00
113369.08
1.13 Lakhs

447524687.xlsx-Entrance Gate- 2075


Page 2076 of 2191

KODADA MUNICIPALITY
Development of Rajiv Park in Nalgonda Municipality, Under Amrut
Construction of Toilets
ABSTRACT AND DETAILED ESTIMATE
S.N. Description of Item Nos L B D Quantity Rate Per
A EWE for footings : A1,B1,A2,B2 1 x 4 1.30 1.30 1.80 12.17
12.17 Cum
1 RBR-FNDN-1-A-i -manual means : Earthwork excavation for structures in all types of
soils up to 3.00 Mts depth below GL as per drawing and technical specifications
including setting out, construction of shoring and bracing, removal of stumps and
other deleterious material and disposal upto a lead of 50 m, dressing of sides and
bottom and backfilling in trenches with excavated suitable material as per Technical
Specification 305 MORD / 304 MORTH. for Sumps,Thrust blocks, Chambers and Bld up to 3F
S.No 7
Man Holes etc. by manual means,
in all types of soils for footings 80 % 9.74 Cum 221.47 1 Cum
2 BLD-CSTN-2-7 - (15) - Hard rock (blasting prohibited)-Upto 3 m depth
Earth work excavation and depositing on bank for all lifts and with an initial lead of
10m including all operational, incidental, labour charges such as shoring ,sheeting,
planking, strutting, etc. complete for finished item of work including seigniorage
excluding dewatering charges etc as per SS - 20 B (APSS 308). Bld up to 3F
S.No 6
in Hard rocky soils 20 % 2.43 Cum 1893.14 1 Cum
B Earth work excavation for fundation of Walls
Toilet - long walls 1 x 2 4.90 0.45 0.40 1.76
Toilet - short walls 1 x 3 3.02 0.45 0.40 1.63
Toilets - inner short walls 1 x 2 1.93 0.45 0.40 0.69
Toilets - inner Long walls 1 x 1 5.05 0.45 0.40 0.91
4.99 Cum
3 BLD-CSTN-2-1 (9): Earth work excavation for foundations and depositing on bank
for all lifts and with an initial lead of 10m including all operational, incidental, labour
charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item
of work including seigniorage excluding dewatering charges etc as per SS - 20 B
(APSS 308). Bld up to 3F
S.No 1
in all types of soils 80 % 3.99 Cum 369.10 1 Cum

Toilets- -447524687.xlsx 2076


Page 2077 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


4 BLD-CSTN-2-7 - (15) - Hard rock (blasting prohibited)-Upto 3 m depth : Earth work
excavation and depositing on bank for all lifts and with an initial lead of 10m
including all operational, incidental, labour charges such as shoring ,sheeting,
planking, strutting, etc. complete for finished item of work including seigniorage
excluding dewatering charges etc as per SS - 20 B (APSS 308). Bld up to 3F
S.No 6
in Hard rocky soils 20 % 1.00 Cum 1893.14 1 Cum

Toilets- -447524687.xlsx 2077


Page 2078 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


5 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level : Plain
Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse
aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost
and conveyance of all materials like cement, sand, coarse aggregate water etc., to
site , seigniorage charges on all materials, labour charges , for mixing , laying,
concrete , ramming in 15 cm layers, finishing top surface to the required level curing
etc., complete for finished item of work.for foundation and under flooring bed. Bld up to 3F
S.No 12
a For Footings
Footings : A1,B1,A2 & B2 1 x 4 1.30 1.30 0.15 1.01
Foundations
Toilet - long walls 1 x 2 4.90 0.45 0.10 0.44
Toilet - short walls 1 x 3 3.02 0.45 0.10 0.41
Toilets - inner short walls 1 x 2 1.93 0.45 0.10 0.17
Toilets - inner Long walls 1 x 1 5.05 0.45 0.10 0.23
2.26 Cum
b for Flooring Bed
Toilets Front area 1 x 2 2.51 0.88 0.075 0.33
Toilets Gents & Ladies 2 x 2 1.93 1.18 0.075 0.68
1.01 Cum
Total a + b 3.27 Cum 3785.55 1 Cum
6 BLD-CSTN-2-9 (17): Filling with useful available excavated earth (excluding rock) in
trenches, sides of foundations and basement with initial lead in layers not exceeding
15 cm thick, consolidating each deposited layer by watering and ramming including
cost and conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work. (APSS NO.
309 & 310) Bld up to 3F
S.No 10
for filling basement
Toilets Front area 1 x 1 2.51 0.88 0.225 0.50
Toilets Gents & Ladies 1 x 2 1.93 1.18 0.225 1.02
1.52 Cum 29.94 1 Cum

Toilets- -447524687.xlsx 2078


Page 2079 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


7 BLD-CSTN-3-14-(31) - A : Supply and placing of the M-20 Design Mix Concrete
corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (sand)
coarse aggregate, water etc., to site and including Seigniorage charges, sales &
other taxes on all materials including all operational, incidental and labour charges
such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS
No. 402)with minimum cement content as per IS code fo FOUNDATIONS, PLINTH,
PEDESTALS Bld up to 3F
S.No 19
a for Footings
Footings : A1,B1,A2 & B2 1 x 4 1.10 1.10 0.30 1.45
Total 1.45 Cum 7923.65 1 Cum
b for Pedastals
1 x 4 0.40 0.40 0.60 0.38
0.38 Cum 9665.14 1 Cum
c Plinth Beams
Toilet - long walls 1 x 2 4.90 0.23 0.30 0.68
Toilet - short walls 1 x 3 3.02 0.23 0.30 0.63
1.31 Cum 11576.60 1 Cum
8 BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-20 Design Mix Concrete
corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (sand)
coarse aggregate, water etc., to site and including Seigniorage charges, sales &
other taxes on all materials including all operational, incidental and labour charges
such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS
No. 402)with minimum cement content as per IS code for COLUMNS, LINTELS,
WATER TANKS, RCC WALLS IN BUILDINGS Bld up to 3F
S.No 20
a C1 Coloumns Up to Ground level 1 x 4 0.23 0.30 0.75 0.21
C1 Columns above GL and up to roof level 1 x 4 0.23 0.30 3.30 0.91
1.12 Cum 11959.00 1 Cum
b Lintels

Toilets- -447524687.xlsx 2079


Page 2080 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


over D1 Doors 1 x 2 1.20 0.23 0.20 0.11
over D2 Doors 1 x 4 1.05 0.23 0.20 0.19
ventilators 1 x 4 0.90 0.23 0.20 0.17
0.47 Cum 12006.04 1 Cum

Toilets- -447524687.xlsx 2080


Page 2081 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


9 BLD-CSTN-3-16-(31)-C: Supply and placing of the M-20 Design Mix Concrete
corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (sand)
coarse aggregate, water etc., to site and including Seigniorage charges, sales &
other taxes on all materials including all operational, incidental and labour charges
such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS
No. 402)with minimum cement content as per IS code from standard suppliers
approved by the department including pumping, centering, shuttering, laying
concrete, vibrating, curing etc. complete but excluding cost of steel and its
fabrication charges for finished item of work. for RCC SLABS, BEAMS
Bld up to 3F
S.No 21-B
a 115mm thick roof slab GF
Toilets 1 x 1 5.50 3.48 0.115 2.20
or Say 2.20 Cum 5969.75 1 Cum
b Roof Beams
Toilet - long walls 1 x 2 4.90 0.23 0.30 0.68
Toilet - short walls 1 x 2 3.02 0.23 0.30 0.42
1.10 Cum 10500.72 1 Cum
10 BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop
using hard granite stone including cost & Conveyance of all materials like Cement,
Sand , Water, Granite Stones, including Seigniorage Charges on all Materials,
,labour charges for cutting Stones to required size and shape, mixing of Cement
Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of
Work . Bld up to 3F
S.No 28
Below Ground Level
Toilet - long walls 1 x 2 4.90 0.45 0.30 1.32
Toilet - short walls 1 x 3 3.02 0.45 0.30 1.22
Toilets - inner short walls 1 x 2 1.93 0.45 0.30 0.52
Toilets - inner Long walls 1 x 1 5.05 0.45 0.30 0.68
3.74 Cum 3470.13 1 Cum

Toilets- -447524687.xlsx 2081


Page 2082 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


11 BLD-CSTN-6-6-(61) : Construction of CRS Masonary 2nd Sort in Cement Mortor
( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials
like Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all
Materials, ,labour charges for cutting Stones to required size and shape, mixing of
Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished
Above GL for. for
item of Work Base ment
Base ment.
Partion wall 1 x 1 3.02 0.30 0.30 0.27
Toilets - inner short walls 1 x 2 1.93 0.30 0.30 0.35
Toilets - inner Long walls 1 x 1 5.05 0.30 0.30 0.45
or Say 1.07 Cum 4074.46 1 Cum
12 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level: Plain Cement
concrete nominal mix m-20 (Cement : fine aggregate: coarse aggregate ) using
12mm size Hard Granite Machine Crushed Graded Metal including cost and
conveyance of all materials like cement, sand, coarse aggregate water etc., to site ,
seigniorage charges on all materials, labour charges , for mixing , laying, concrete ,
ramming in 15 cm layers, finishing top surface to the required level curing etc.,
complete for finished item of work with nomonal reinforcement Bld up to 3F
S.No 18
Bed blocks for fixing of Doors 4 x 6 0.20 0.23 0.10 0.11
0.11 Cum 5044.84 1 Cum
13 BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size
23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all
Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges
on all materials, including all labour charges like mixing Cement Mortor, scaffoding
charges lift charges , curing charges etc., complete for finished item of work Bld up to 3F
S.No 31
Toilet - long walls 1 x 2 4.90 0.23 2.83 6.37
Toilet - short walls 1 x 3 3.02 0.23 2.83 5.89
Deductions
over D1 Doors -1 x 2 0.90 0.23 1.98 -0.82
ventilators -1 x 4 0.60 0.23 0.45 -0.25
11.19 Cum 5455.18 1 Cum
14 BLD-CSTN-5-11 (49) : 11.5 cm wide Brick masonry for super-structure on ground
floor in cm (1:3) using second class traditional size bricks including cost of all
materials, seigniorage charges, labour and all operations for constructing half brick
masonry, mixing cement mortar, curing etc., complete for finished item of work, but Bld up to 3F
excluding conveyance charges of materials. S.No 33

Toilets- -447524687.xlsx 2082


Page 2083 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


Partion wall 1 x 1 3.02 3.19 9.62
Toilets - inner short walls 1 x 2 1.93 3.19 12.29
Toilets - inner Long walls 1 x 1 5.05 3.19 16.08
Deduction for openings
over D2 Doors -1 x 4 0.75 1.98 -5.94
32.05 sqm 6962.33 10 sqm
15 BLD-CSTN-8-7-(82) : Plastering with 20mm thick in single coat in CM (1:4) finished
smooth including cost and conveyance of all materials to site, seigniorage charges
on all materials, finishing, curing, scaffolding and all operational, incidental, labour
charges etc., including cutting grooves where ever necessary etc., complete for Bld up to 3F
finished item of work. (As per SS 903). per 10 Sqm. S.No 36
Outer walls
Toilet - long walls 1 x 2 3.36 3.30 22.18
Toilet - short walls 1 x 2 2.78 3.30 18.35
or Say 40.53 Sqm 2322.92 10 Sqm
16 BLD-CSTN-8-2-(77): Plastering with 12mm thick in single coat in CM (1:4) finished
smooth including cost and conveyance of all materials to site, seigniorage charges
on all materials, finishing, curing, scaffolding and all operational, incidental, labour
charges etc., including cutting grooves where ever necessary etc., complete for
Bld up to 3F
finished item of work. (As per SS 903).
S.No 34
Inner walls
Toilets Front area 1 x 2 2.51 0.880 2.88 19.49
Toilets Gents & Ladies 2 x 2 1.93 1.180 2.88 35.77
Deduction for openings
Doors D1 -1 x 2 0.90 1.98 -3.56
Doors D2 -1 x 4 0.75 1.98 -5.94
ventilators -1 x 4 0.60 0.45 -1.08
44.68 Sqm 1507.50 10 Sqm
17 BLD-CSTN-8-1-(76):Plastering with 12mm thick in single coat in CM (1:3) finished
smooth including cost and conveyance of all materials to site, seigniorage charges
on all materials, finishing, curing, scaffolding and all operational, incidental, labour
charges etc., including cutting grooves where ever necessary etc., complete for
finished item of work. (As per SS 903). per 10 Sqm.Ceiling Bld up to 3F
S.No 33

Toilets- -447524687.xlsx 2083


Page 2084 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


Toilets Front area 1 x 2 2.51 0.88 4.42
Toilets Gents & Ladies 2 x 2 1.93 1.18 9.11
Add for exposed faces of beams etc. 0.27
13.80 Sqm 1601.57 10 Sqm

Toilets- -447524687.xlsx 2084


Page 2085 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


18 BLD-CSTN-11-4- (161): White washing Two coat with whiting of approved quality to
give an even shade after thoroughly brushing the surface to remove all dirt and
remains of loose powdered materials including cost of all materials, labour charges
and incidental such as scaffolding, lift charges etc., complete for finished item of
work. Bld up to 3F
S.No 56
Qty as per ceiling & inner rplastering 58.48 Sqm 250.11 10 Sqm
19 BLD-CSTN-11-8-(164): Colour washing two coats with approved Colour and quality
to give an even shade after thoroughly brushing the surface to remove all dirt and
remains of loose powdered materials including cost of all materials, labour charges
and incidental such as scaffolding, lift charges etc., complete for finished item of
work, but excluding conveyance charges of materials Bld up to 3F
S.No 57
Qty as per external wall plastering 40.53
40.53 Sqm 584.62 10 Sqm
20 BLD-CSTN-10-25-(148):Providing impervious coat to exposed RCC roof slab
surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of
cement laid over roof when it is green including cost of all materials, seigniorage
charges, excluding conveyance charges of materials and including all operational,
incidental and labour charges for mixing mortar, laying, rendering smooth and thread
lining, curing, rounding off junctions of wall and slab etc,, complete for finished item
of work Bld up to 3F
S.No 51
Qty as per Slab area 58.48 Sqm 4616.35 10 Sqm
21 BLD-CSTN-4-1-(34): Providing High Yield Strength Deformed (HYSD)/ Thermo
Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as
per IS 1786-1979) of different diameters for RCC works , including labour charges
for straightening, cutting, bending to required sizes and shapes, placing in position
with cover blocks of approved materials and size and tying and lap-splicing with
binding wire of 18 SWG, forming grills for reinforcement work as per approved
designs and drawings, including cost and conveyance of steel bars, including all
wastages such as overlaps, couplings, chairs, spacer bars including cost and
conveyance of binding wire, cover blocks and all incidental, operational, labour
charges such as cutting, bending, placing in position, tying including sales and other
taxes on all materials etc., complete for finished item of work in all floors.( APSS
No.126 Bld up to 3F
S.No 22
Footings and pedastals 1.83 30.00 Kg/Cum 54.90
Columns 1.12 110.00 Kg/Cum 123.20
Plinth Beams 1.31 70.00 Kg/Cum 91.70

Toilets- -447524687.xlsx 2085


Page 2086 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


Roof Beams 1.10 100.00 Kg/Cum 110.00
Lintels 0.47 40.00 Kg/Cum 18.80
115mm Thick Slabs 2.20 80.00 Kg/Cum 176.00
Total 574.60 Kgs
Or Say 0.57 MTs 68714.00 1 MTs

Toilets- -447524687.xlsx 2086


Page 2087 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


22 TBSC-L.I-11: Providing and fixing door frames fabricated from sections made of
galvanized steel powder coated (base steel as per IS 513, galvanised as per IS 277
with zinc of 120 grams / square metre), the factory made section are powder coated
with pure polyester powder of 50-60 microns thick with total coated thickness of 1.25
mm, size of door frame section is of 105 x 60 mm with a rebate of 38 mm to
accommodate 35 mm thick door shutter, with groove to insert gasket in the frame
section, frame section filled with polyurethane foam, cut to length, and joined by way
of welding, each frame provided with: a) 2mm thick MS powder coated butt hinges of
100 mm long – 3 Nos. for single shutter, 6 Nos. for double shutter. b) CRCA
electroplates stiffeners of 6 Nos. – 3 in each vertical. c) 40 mm x 200 mm x 1.2 mm
hold fasts screwed to stiffeners – 6 Nos. with split end tail. d) Nylon Aldrop Receiver
– 1 No. for single shutter frame. e)Tie Rod – 1 No
Bld - data-
S.No 111
Doors D1 1 x 2 4.860 9.72
9.72 Rmt 781.67 1 Rmt
23 Supply and fixing of 25 mm thick Flush Door shutter solid bond wood block board
type with commercial ply on both faces with 1no. 300 mm long Aldrop, 2 nos. 125
mm lond door handle, 1 no. 150 mm long tower bolt, 1 no. 250 mm long door latch
1 No. door stopper ( all fixturs MS Powder coated ) including c/c of all materials and
labour chrges etc., complete Bld - data-
S.No 112
Doors D1 1 x 2 0.900 1.980 3.56
3.56 Sqm 1579.20 1 Sqm
24 TBSC-L.III-03: Providing and fixing 30mm thick FACTORY MADE SOLID SINGLE
SIDE PRELAM PANEL PVC DOOR SHUTTER consisting of frame made out of MS.
Tubes of 19gauge thickness and size of 19mmX19mm for stiles, and 15mmX15mm
for top and bottom rails. The MS. Frame shall have a coat of steel primers of
approved make and anufacture. MS. Frame covered with 5mm thick heat molded
single side Prelam Pac ‘C’ channel of size 30mmX50mm to form stiles.5mm thick&
75mm wide single side prelim Pac sheets shall be for the top, bottom and lock rails.
Paneling of 5mm thick one side Pac sheet to be fitted in the MS. Frame and sealed
to the front (prelam side) stiles and rails (which should have a 5mm 45 bent portion
as beading) and attached to the back(white/ivory) stiles and rails which should have
a 10mm 900 bent portion as beading ) using 2nos. 15mm wide X 5mm thick Pac
sheet beading inside the 90 bent beading. All stiles, rails and beadings are to be
joined to the panel using solvent cement etc. an additional 5mm thick Pac strip of
20mm width to be stuck on the interior side of the ‘C” channel using Pac solvent
cement adhesive and 10mm(5mmX2) thick, 20mm wide cross Pac sheet to be fitted
as gap insert for top and bottom rail etc. complete as per direction of Engineer –in-
Charge, manufacture specification and drawing.

Toilets- -447524687.xlsx 2087


Page 2088 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


Door D2 1 x 4 0.750 1.980 5.94 Sqm 2524.53 1 Sqm
25 BLD-CSTN-9-6-(104) : Flooring with ceramic tiles (Non skid type), set over base
coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab,
including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm &
jointed neatly with white cement paste to full depth mixed with pigment of matching
shade, including cost of all materials like cement, sand water and tiles etc.,
complete, for finished item of work, but excluding the cost of conveyance of all
materials. (For Toilets)

. Toilets Front area 1 x 2 2.51 0.88 4.42


Toilets Gents & Ladies 2 x 2 1.93 1.18 9.11
add for steps etc 0.14
13.67 Sqm 8089.46 10 Sqm
26 Supplying and fixing of 7.5mm thick Aluminium Grill (as approved by the
department) 3.58 Kg/Sqm.including cost and conveyance of all material and all
labour charges etc, complete.
ventilators 1 x 4 0.60 0.45 1.08
1.08 sqm 1146.38 1 sqm

Toilets- -447524687.xlsx 2088


Page 2089 of 2191

S.N. Description of Item Nos L B D Quantity Rate Per


26 BLD-CSTN-9-18-(116) : Dadooing to walls with Glazed colour tiles of any size 1st
quality set over a base coat of CM(1:3) Prop. 12mm thick and neat Gray cement
slurry of Honey like consistancy sread at the rate of 3.30 Kg of cement per One
Square Meter and jointed wiyh neat White cement paste mixed with pigmant of
matching shade including cost and conveyance of all materials like cement, sand,
water, flooring Tiles etc. to site, all operational, incidental and labour charges such
as mixing of cement mortar, laying, jointing, curing, lift charges etc., complete for
finished item of work (for toilets)

Toilets Front area 2 x 2 2.51 0.88 1.200 16.27


Toilets Gents & Ladies 2 x 4 1.93 1.18 1.200 29.86
Deductions
Doors D1 -1 x 2 0.90 1.980 -3.56
Doors D2 -1 x 4 0.75 1.980 -5.94
36.62 sqm 5464.68 10 sqm
Total of - A
Add for Sanitary and WS works @ 7.5%
Add for Electrification @ 5%

Total Rs.
Total Cost Say Rs.

Toilets- -447524687.xlsx 2089


Page 2090 of 2191

A MUNICIPALITY
n Nalgonda Municipality, Under Amrut
uction of Toilets
D DETAILED ESTIMATE
Amount

2157.00

4600.00

1473.00

Toilets- -447524687.xlsx 2090


Page 2091 of 2191

Amount

1893.00

Toilets- -447524687.xlsx 2091


Page 2092 of 2191

Amount

12379.00

46.00

Toilets- -447524687.xlsx 2092


Page 2093 of 2191

Amount

11489.00

3673.00

15165.00

13394.00

Toilets- -447524687.xlsx 2093


Page 2094 of 2191

Amount

5643.00

Toilets- -447524687.xlsx 2094


Page 2095 of 2191

Amount

13133.00

11551.00

12978.00

Toilets- -447524687.xlsx 2095


Page 2096 of 2191

Amount

4360.00

555.00

61043.00

Toilets- -447524687.xlsx 2096


Page 2097 of 2191

Amount

22314.00

9415.00

6736.00

Toilets- -447524687.xlsx 2097


Page 2098 of 2191

Amount

2210.00

Toilets- -447524687.xlsx 2098


Page 2099 of 2191

Amount

1463.00

2369.00

26996.00

Toilets- -447524687.xlsx 2099


Page 2100 of 2191

Amount

39167.00

Toilets- -447524687.xlsx 2100


Page 2101 of 2191

Amount

7598.00

5622.00

Toilets- -447524687.xlsx 2101


Page 2102 of 2191

Amount
14996.00

11058.00

1238.00

Toilets- -447524687.xlsx 2102


Page 2103 of 2191

Amount

20014.00
346728.00
26004.60
17336.40
390069.00
390069.00
3.90 Lakhs

Toilets- -447524687.xlsx 2103


Page 2104 of 2191

KODADA MUNICIPALITY
Development of Rajiv Park in Nalgonda Municipality, Under Amrut
DETAILED & ABSTRACT ESTIMATION
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
C Greenary & Childern's Play Area
1 RBR-HRTC-5:Making lawns including ploughing and breaking of clod,
removal of rubbish, dressing and supplying doobs grass roots and planting at
15 cm apart, including supplying and spreading of farm yard manure at rate
Data -Parks
of 0.18 cum per 100 sqm including maintaning for 1 year. -5
Area as per Drawing 1 x 1 4262.00
4262.00 Sqm 37.60 1 Sqm
2 BLD-CSTN-2-9 (17) : Filling with useful available excavated earth (excluding
rock) in trenches, sides of foundations and basement with initial lead in
layers not exceeding 15 cm thick, consolidating each deposited layer by
watering and ramming including cost and conveyance of water to work site
and all operational, incidental, labour charges, hire charges of T & P etc.,
complete for finished item of work. (APSS NO. 309 & 310)

Filling Top soil 1 x 1 4262.00 0.30 1279.00


1279.00 cum 29.94 1 cum
3 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating
each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310)

Children's play area 1 x 1 583.00 0.30 175.00


175.00 cum 910.40 1 cum
4 RBR-HRTC-8: Planting ( Running metres 200 plants and 800 shrubs in two
rows in one km length of road where width of verge is 3m and above.)as per Data -Parks
Specification 307 MORTH -8
Area as per Drawing 1 x 450 450.00
450.00 Rmt 124.94 1 Rmt

447524687.xlsx-Greenary& play area 2104


Page 2105 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
5 RBR-HRTC-9: Planting of trees by the road side (Avenue trees) in 0.60 m dia
holes, 1 m deep dug in the ground, mixing the soil with decayed farm
yard/sludge manure, planting the saplings, backfilling the trench, watering,
Data -Parks
fixing the tree guard and maintaining the plants for one year -9
Ornamental trees 1 x 90 90.00 Nos 1550.80 1 Nos
6 RBR-HRTC-7: Planting permanent hedges including digging of trenches, 60
cm wide and 45 cm deep, refilling the excavated earth mixed with farmyard
manure, supplied at the rate of 4.65 cum per 100 metres and supplying and
planting hedge plants at 30 cm apart, and maintaining for 1 year Data -Parks
- 7 (a)
as per Drawing 1 x 3 270.00 Rmt 222.40 1 Rmt
7 Planting palms including digging of pits 60cm. Cubes, loosening of 15cm. As Per
Bottom red soil, filling with soil with 10 kg Compost + 100 DAP per pit staking Quotation
gap filling with in two month after planting. s
inside the Lawns and other places 2 x 45 90 Nos 350.00 1 Nos
8 Planting Speciman plants including digging of pits 60cm. Cubes, loosening of As Per
15cm. Bottom red soil, filling with soil with 10 kg Compost + 100 DAP per pit Quotation
staking gap filling with in two month after planting. s
Golden bamboo 8” 1 x 20 20 Nos 862.50 1 No
Fercaria 2” 1 x 20 20 Nos 1437.50 1 No
Ficus 4” (Verites). 1 x 20 20 Nos 575.00 1 No
Bottle Bush 1 x 20 20 Nos 690.00 1 No
9 Providing seating area development by providing cast Iron /Cement seats As Per
as directed by Engineer incharge etc, complete. Quotation
s
Idle Park bench 1 x 15 15 No 9875.00 1 No
10 See Saw 4 Seater 1 x 4 4 No 11645.00 1 No
11 Swinging Bench 1 x 4 4 No 19500.00 1 No
12 4 Way Climber 1 x 3 3 No 19080.00 1 No
13 Provision for Name Boards
Sub- Total for Greenary
Total
Say Rs.

447524687.xlsx-Greenary& play area 2105


Page 2106 of 2191

ADA MUNICIPALITY
in Nalgonda Municipality, Under Amrut
& ABSTRACT ESTIMATION

Amount

160251.20

38293.26

159320.00

56223.00

447524687.xlsx-Greenary& play area 2106


Page 2107 of 2191

Amount

139572.00

60048.00

3850.00

4312.50
7187.50
2875.00
3450.00

148125.00
46580.00
78000.00
57240.00
5000.00
970327.46
970327.00
9.70 Lakhs

447524687.xlsx-Greenary& play area 2107


Page 2108 of 2191

KODADA MUNICIPALITY
Development of Rajiv Park in Nalgonda Municipality, Under Amrut
Providng Jogging Tracks
DETAILED & ABSTRACT ESTIMATION
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
A Jogging Tracks
1 BLD-CSTN-2-1 (9): Earth work excavation and depositing on bank for all lifts
and with an initial lead of 10m including all operational, incidental, labour
charges such as shoring ,sheeting, planking, strutting, etc. complete for
finished item of work including seigniorage excluding dewatering charges etc
as per SS - 20 B (APSS 308). Data- Bld -
1
a For Walking Track
for sectioning and levelling the ground for Pathways - 2.5m wide 1 x 1 288.00 2.90 0.150 125.28
for sectioning and levelling the ground for Jagging track - 2.5m wide 1 x 1 300.00 2.90 0.150 130.50
for kerbing walls on both sides of the path ways 1 x 1 300.00 0.30 0.150 13.50
Total Qty 269.28 Cum 369.10 1 Cum
2 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating
each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310) Data- Bld -
10
For levelling the track between walls - Pathways - 2.5m wide 1 x 1 288.00 2.90 0.075 62.64
For levelling the track between walls - Jagging track - 2.5m wide 1 x 1 300.00 2.90 0.075 65.25
127.89 Cum 910.40 1 Cum
3 BLD-CSTN-3-6 ( 23 ) -Hand mixing up to Plinth Level : Plain Cement
concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse
aggregate ) using 40mm size Hard Granite Machine Crushed Metal including
cost and conveyance of all materials like cement, sand, coarse aggregate
water etc., to site , seigniorage charges on all materials, labour charges ,
for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface
to the required level curing etc., complete for finished item of work.for
foundation and under flooring bed. Data- Bld -
15
For levelling the track between walls - Pathways - 2.5m wide 1 x 1 288.00 2.70 0.075 58.32
For levelling the track between walls - Jagging track - 2.5m wide 1 x 1 300.00 2.70 0.075 60.75

447524687.xlsx-Jogging Tracks 2108


Page 2109 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
Total Qty 119.07 Cum 3726.65 1 Cum

447524687.xlsx-Jogging Tracks 2109


Page 2110 of 2191

MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
4 RBR-CCPV-13 - ii: Providing and Laying of Interlocking Concrete Block
Pavements using PHOENIX or equivalent high strength Cement Concrete
interlocking Regular Pavers of 50 mm thickness of M- 40 Grade of which top
12 mm thick shall be for colour pigmentation with imported colours and
white cement to get required reflective glazing inclusive of all taxes - as per
Data- Bld -
drawing and Technical Specification Clause 1504 MORD 124
for Path way 1 x 1 288.00 2.50 720.00
for Jogging tracks 1 x 1 300.00 2.50 750.00
Total Qty 1470.00 Sqm 570.70 1 Sqm
5 RBR-TSRA-29 : Cast in Situ Cement Concrete M20 Kerb: Construction of
cement concrete kerb with top and bottom width 115 and 165 mm
respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150
mm thick, foundation having 50 mm projection beyond kerb stone, kerb
stone laid with kerb laying machine, foundation concrete laid manually, all
complete as per clause 408 MORTH Data- Bld ,
S.No 19
Curb wall as per requirement 1 x 1 300.00 300.00
300.00 Rmt 286.24 1 Rmt
6 BLD-CSTN-8-2-(77) ; Plastering with 12mm thick in single coat in CM (1:4)
finished smooth including cost and conveyance of all materials to site,
seigniorage charges on all materials, finishing, curing, scaffolding and all
operational, incidental, labour charges etc., including cutting grooves where Data Bld
ever necessary etc., complete for finished item of work. (As per SS 903). per S.No 42
10 Sqm.
outer sides of curb wall above GL 1 x 1 300.00 0.45 135.00
Total 135.00 Sqm 150.75 1 Sqm
Carting of surplus excavated rock from the site to a distance suitable
7
including loading, unloading charges, cost & conveyance, dumping, labour
charges, all leads & lifts and other incidental and operational charges etc.,
complete.
Carting of earth 53.86 Cum 57.10 1 Cum

Say Rs.

447524687.xlsx-Jogging Tracks 2110


Page 2111 of 2191

ADA MUNICIPALITY
in Nalgonda Municipality, Under Amrut
dng Jogging Tracks
& ABSTRACT ESTIMATION

Amount

99391.25

116431.06

447524687.xlsx-Jogging Tracks 2111


Page 2112 of 2191

Amount

443732.22

447524687.xlsx-Jogging Tracks 2112


Page 2113 of 2191

Amount

838929.00

85872.00

20351.00

3075.00
1607782.00
16.08 Lakhs

447524687.xlsx-Jogging Tracks 2113


Page 2114 of 2191

KODADA MUNICIPALITY
Development of Rajiv Park in Nalgonda Municipality, Under Amrut
Providng internal Pathways
S.N. Description of Item Nos L B D Quantity Unit Rate Per
1 RBR-FNDN-1 -manual means : Earthwork excavation for structures in all types of soil as
per drawing and technical specifications including setting out, construction of shoring
and bracing, removal of stumps and other deleterious material and disposal upto a lead
of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable
material as per Technical Specification 305 MORD / 304 MORTH. for Sumps,Thrust Data- Bld,
S.No. 7
blocks, column pits, Chambers and Man Holes etc. by manual means,
6m wide pathway as per drwg 1 x 1 438.00 6.40 0.20 560.64
for kerbing walls on both sides of the path ways 1 x 1 438.00 0.30 0.150 19.71
580.35 Cum 210.92 1 Cum
2 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and basement
with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer
by watering and ramming including cost and conveyance of water to work site and all
operational, incidental, labour charges, hire charges of T & P etc., complete for finished
item of work. (APSS NO. 309 & 310) Data- Bld -
10
6m wide pathway as per drwg 1 x 1 438.00 6.40 0.100 280.32
280.32 Cum 910.40 1 Cum
3 BLD-CSTN-3-10- ( 27 ) Hand mixing: Plain Cement concrete nominal mix (1:3:6) prop
(Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine
Crushed Metal including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour charges , for
mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required
level curing etc., complete for finished item of work.for foundation and under flooring
bed.
6m wide pathway as per drwg 1 x 1 438.00 6.20 0.100 271.56
271.56 Cum 4819.01 1 Cum
4 BLD-CSTN-9-4-(102) : Flooring with precast terrazzo chequered tiles conforming to
IS: 13801 Supplying precast terrazzo plain tiles conforming to IS:13801 using marble
aggregates of size 10mm, sand, marble powder, white cement pigments etc., with
terrazzo topping not less than 6 mm of tiles overall size not less than 20 mm thick any
coloured shades. set over base coat of cement mortar (1:6) 12 mm thick over CC bed Data- Bld ,
S.No 38
already laid or RCC roof slab, including near cement slurry of honey like consistency
6m wide@pathway
spread 3.3.kgs as
perper
sqmdrwg
& jointed with neat cement to full depth mixed with pigment of 1 x 1 438.00 6.00 2628.00
matching shade including cost of all materials like cement, sand water and tiles etc., 2628.00 Sqm 783.45 1 Sqm
complete, including seigniorage charges, complete for finished item of work, including
the cost and conveyance of all materials.

447524687.xlsx 6m wide pathway


Page 2115 of 2191

S.N. Description of Item Nos L B D Quantity Unit Rate Per


5 RBR-TSRA-29 : Cast in Situ Cement Concrete M20 Kerb: Construction of cement
concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in
M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm
projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation
concrete laid manually, all complete as per clause 408 MORTH Data- Bld ,
S.No 19
Curb wall as per requirement 1 x 2 438.00 876.00
876.00 Rmt 286.24 1 Rmt
6 BLD-CSTN-8-2-(77) ; Plastering with 12mm thick in single coat in CM (1:4) finished
smooth including cost and conveyance of all materials to site, seigniorage charges on
all materials, finishing, curing, scaffolding and all operational, incidental, labour charges
etc., including cutting grooves where ever necessary etc., complete for finished item of Data Bld
work. (As per SS 903). per 10 Sqm. S.No 42
outer sides of curb wall above GL 1 x 2 438.00 0.45 394.20
Total 394.20 Sqm 150.75 1 Sqm
7 Carting of surplus excavated rock from the site to a distance suitable including loading,
unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and
other incidental and operational charges etc., complete.
Carting of earth 58.04 Cum 57.10 1 Cum
Total
Total cost of the estimation Rs.
Say

447524687.xlsx 6m wide pathway


Page 2116 of 2191

Amount

122407.00

255203.33

1308650.00

2058907.00

447524687.xlsx 6m wide pathway


Page 2117 of 2191

Amount

250746.00

59426.00

3314.00
4058653.33
4058653.33
40.59 Lakhs

447524687.xlsx 6m wide pathway


Page 2118 of 2191

KODADA MUNICIPALITY
Development of Rajiv Park in Nalgonda Municipality, Under Amrut
Providng internal Pathways
S.N. Description of Item Nos L B D Quantity Unit Rate Per
1 RBR-FNDN-1 -manual means : Earthwork excavation for structures in all types of soil as
per drawing and technical specifications including setting out, construction of shoring
and bracing, removal of stumps and other deleterious material and disposal upto a lead
of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable
material as per Technical Specification 305 MORD / 304 MORTH. for Sumps,Thrust Data- Bld,
S.No. 7
blocks, column pits, Chambers and Man Holes etc. by manual means,
2.5 m wide pathway (at train track) 1 x 1 370.00 2.90 0.15 160.95
2.5 m wide pathway (internal path way) 1 x 1 345.00 2.90 0.15 150.08
311.03 Cum 210.92 1 Cum
2 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and basement
with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer
by watering and ramming including cost and conveyance of water to work site and all
operational, incidental, labour charges, hire charges of T & P etc., complete for finished
item of work. (APSS NO. 309 & 310) Data- Bld -
10
2.5 m wide pathway (at train track) 1 x 1 370.00 2.90 0.075 80.48
2.5 m wide pathway (internal path way) 1 x 1 345.00 2.90 0.075 75.04
155.52 Cum 910.40 1 Cum
3 BLD-CSTN-3-10- ( 27 ) Hand mixing: Plain Cement concrete nominal mix (1:3:6) prop
(Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine
Crushed Metal including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour charges , for
mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required
level curing etc., complete for finished item of work.for foundation and under flooring
bed.
2.5 m wide pathway (at train track) 1 x 1 370.00 2.70 0.075 74.93
2.5 m wide pathway (internal path way) 1 x 1 345.00 2.70 0.075 69.86
144.79 Cum 4819.01 1 Cum

447524687.xlsx 2.5m wide pathway


Page 2119 of 2191

S.N. Description of Item Nos L B D Quantity Unit Rate Per


4 RBR-CCPV-13 - ii: Providing and Laying of Interlocking Concrete Block Pavements
using PHOENIX or equivalent high strength Cement Concrete interlocking Regular
Pavers of 50 mm thickness of M- 40 Grade of which top 12 mm thick shall be for colour
pigmentation with imported colours and white cement to get required reflective glazing
inclusive of all taxes - as per drawing and Technical Specification Clause 1504 MORD Data- Bld ,
S.No 38
2.5 m wide pathway (at train track) 1 x 1 370.00 2.50 925.00
2.5 m wide pathway (internal path way) 1 x 1 345.00 2.50 862.50
1787.50 Sqm 570.70 1 Sqm
7 Carting of surplus excavated rock from the site to a distance suitable including loading,
unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and
other incidental and operational charges etc., complete.
Carting of earth 31.10 Cum 57.10 1 Cum
Total
Total cost of the estimation Rs.
Say

447524687.xlsx 2.5m wide pathway


Page 2120 of 2191

Amount

65602.00

141585.41

697744.00

447524687.xlsx 2.5m wide pathway


Page 2121 of 2191

Amount

1020126.00

1776.00
1926833.41
1926833.00
19.27 Lakhs

447524687.xlsx 2.5m wide pathway


SIDDIPET MUNICIPALITY

Development of Park In SY.No . 972 At Mythrivanam

GENERAL ABSTRACT

S.No Description of Items Quantity Amount in Rs.

1 Construction of Park 1 No Err:509

2 Providing Parking inside the Park 157 Sqm Err:509

3 Providing Solar Lighting 16 No #REF!

4 Providing Rain Water Hervesting Structures 5 Nos #REF!

5 Drilling of Borewell and fitted with submersible motor (1 Nos ) LS 1 No 212000.00

Sub-Total. A Rs. Err:509

5 Add VAT @ 5% Err:509

6 Add Labour Cess @ 1% Err:509

7 Provision towards QC @ 1% Err:509

8 Provision towards NAC @ 0.1% Err:509

9 Provision towards seiniorage charges 60000.00


Provision towards Consultancy charges for Preparation of DPRs @
10 Err:509
1.5%
11 L.S for Unforseen items and including Garbage Bins 64881.00

Sub-Total. B Rs. Err:509

Total Project Cost ( A+B ) Rs. Err:509

Say Rs. Err:509


Page 2123 of 2191
SIDDIPET MUNICIPALITY
Construction of Park at Mythrivanam
DETAILED & ABSTRACT ESTIMATION
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
A Compound Wall
Compound Wall North side 1 x 1 64.74
Compound Wall South side 1 x 1 57.66
Compound Wall East side 1 x 1 50.19
Total length of the Compound Wall around the Proposed Park 173.00 0.60 0.60 62.28
for gate Pillars 2 x 2 1.10 1.10 1.00 4.84
Deduction for gate pillars -2 x 2 1.10 0.60 0.60 -1.58
65.54 Cum
1 BLD-CSTN-2-1 (9) : Earth work excavation for foundations and depositing on
bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308). Data- Bld -
1
% of Total Qty 1 x 1 80% 53.00 Cum Err:509 1 Cum
2 BLD-CSTN-2-7 - (15) : Earth work excavation for foundations and depositing
on bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308). Data- Bld -
6
% of Total Qty 1 x 1 20% 14.00 Cum Err:509 1 Cum
3 BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level :
Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate:
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work.for foundation and under flooring bed. Data- Bld -
12
for Compound Wall 1 x 1 173.00 0.6 0.10 10.38
for gate Pillars 2 x 2 1.10 1.10 0.15 0.73
Deduction for gate pillars -2 x 2 1.10 0.60 0.10 -0.26

447524687.xlsx-Park-Mythrivanam 2123
Page 2124 of 2191
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
10.85 Cum Err:509 1 Cum
4 BLD-CSTN-3-13- ( 30 ) - A- Nominal mix: RCC M- 20 Nominal mix
(Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS
456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and
its fabrication charges for finished item of work, but including centering and
shuttering charges for FOUNDATIONS, PLINTH, PEDESTALS Data- Bld -
19.a,b
a Footings for Gate pillars 2 x 2 1.00 1.00 0.20 0.80 Cum Err:509 1 Cum
b Pedastals for Gate pillars 1 x 2 0.60 0.60 0.65 0.47 Cum Err:509 1 Cum
5 BLD-CSTN-3-13- ( 30 ) - B- Nominal mix: RCC M- 20 Nominal mix
(Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS
456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and
its fabrication charges for finished item of work, but including centering and
shuttering charges for COLUMNS, LINTELS, WATER TANKS, RCC WALLS
IN BUILDINGS - WOODEN SCAFFOLDING Data- Bld -
92
for Gate pillars 1 x 2 0.30 0.30 2.00 0.36 Cum Err:509 1 Cum
6 BLD-CSTN-6-12-(67) : Construction of RR Masonary in Cement Mortor
( 1:8 ) Prop using hard granite stone including cost & Conveyance of all
materials like Cement, Sand , Water, Granite Stones, including Seigniorage
Charges on all Materials, ,labour charges for cutting Stones to required size
and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges
curing etc., complete for finished item of Work . Data- Bld -
31
For Foundations below GL
for Compound Wall 1 x 1 173.00 0.60 0.60 62.28
62.28 Cum Err:509 1 Cum

447524687.xlsx-Park-Mythrivanam 2124
Page 2125 of 2191
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
7 BLD-CSTN-6-6-(61) ; Construction of CRS Masonary 2nd Sort in Cement
Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of
all materials like Cement, Sand , Water, Granite Stones, including
Seigniorage Charges on all Materials, ,labour charges for cutting Stones to
required size and shape, mixing of Cement Mortor, Construction, Scaffolding
Charges curing etc., complete for finished item of Work . Data- Bld -
30
Compound Wall Front side excluding gate 1 x 1 59.30 0.45 0.45 12.01
for pillars for fixing MS grills in front side at every 3.00m C/C 1 x 20 0.45 0.45 1.80 7.29
Compound Wall South side 1 x 1 57.66 0.45 0.45 11.68
Compound Wall East side 1 x 1 50.19 0.45 0.45 10.16
Deduction for CRS pillars from wall -1 x 20 0.45 0.45 0.45 -1.82
Net Qty 39.32 Cum Err:509 1 Cum
8 BLD-CSTN-5-4-(42) ; Brick Masonary 2nd Class Ground moulded or
treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost &
conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site
cost of Seigniorage charges on all materials, including all labour charges
like mixing Cement Mortor, scaffoding charges lift charges , curing charges
etc., complete for finished item of work Data- Bld -
25
Compound Wall South side 1 x 1 57.66 0.230 1.35 17.90
Compound Wall East side 1 x 1 50.19 0.230 1.35 15.58
Add for Brick Pillars @ every 3.00m C/C 1 x 40 0.35 0.350 1.35 6.62
Deduction for Brick Pillars -1 x 40 0.35 0.23 1.35 -4.35
Net Qty 35.75 Cum Err:509 1 Cum
9 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level
Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing
top surface to the required level curing etc., complete for finished item of
work with nomonal reinforcement Data- Bld -
18
Over CRS Walls in front side for fixing the Grills (0.15+0.2)/2 2 x 20 3.00 0.225 0.175 4.73
Over CRS Pillars in front side 1 x 20 0.45 0.45 0.075 0.30
Over CRS walls
Compound Wall South side 1 x 1 57.66 0.45 0.05 1.30
Compound Wall East side 1 x 1 50.19 0.45 0.05 1.13
Over Brick walls with 0.025m bearing

447524687.xlsx-Park-Mythrivanam 2125
Page 2126 of 2191
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
Compound Wall South side 1 x 1 57.66 0.28 0.075 1.21
Compound Wall East side 1 x 1 50.19 0.28 0.075 1.05
Over Pillars 1 x 40 0.35 0.35 0.075 0.37
Deduct Brick Pillars portion from walls -1 x 40 0.35 0.23 0.075 -0.24
9.85 Cum Err:509 1 Cum
10 BLD-CSTN-7-3-(74): Providing raised Cement Pointing to RR Masonary in
Cement Mortor (1:3 )Prop . for including cost & conveyance of all materials
to site , seignaiorage charges on all materials, labour charges on all
materials, curing etc., Complete for finished item of work Data- Bld -
34
Both sides of CRS walls
Compound Wall Front side excluding gate 1 x 2 59.30 0.45 53.37
for pillars for fixing MS grills in front side at every 3.00m C/C 20 x 4 0.45 1.80 64.80
Compound Wall South side 1 x 2 57.66 0.45 51.89
Compound Wall East side 1 x 2 50.19 0.45 45.17
215.23 Sqm Err:509 1 Sqm
11 BLD-CSTN-8-2-(77) : Plastering with 12mm thick in single coat in CM (1:4)
finished smooth including cost and conveyance of all materials to site,
seigniorage charges on all materials, finishing, curing, scaffolding and all
operational, incidental, labour charges etc., including cutting grooves where
ever necessary etc., complete for finished item of work. (As per SS 903). per
10 Sqm. Data- Bld -
36
Both sides of Compound wall ( including DPC )
Compound Wall South side 1 x 2 57.66 1.35 155.68
Compound Wall East side 1 x 2 50.19 1.35 135.51
for exposed faces of the Brick pillars 2 x 40 0.12 1.35 12.96
over coping of Brick walls 1 x 1 107.85 0.28 30.20
334.35 Sqm Err:509 1 Sqm
12 BLD-CSTN-11-5-(162) : White washing two coats with whiting of approved
quality to give an even shade after thoroughly brushing the surface to
remove all dirt and remains of loose powdered materials including cost of all
materials, labour charges and incidental such as scaffolding, lift charges etc.,
complete for finished item of work, but excluding conveyance charges of
materials Data- Bld -
59
Qty as per Plastering area excluding pillars 334.35
Deduct Pillars plastering -2 x 40 0.35 1.35 -37.80
Qty as per Plastering area excluding pillars 296.55 Sqm Err:509 1 Sqm

447524687.xlsx-Park-Mythrivanam 2126
Page 2127 of 2191
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
13 BLD-CSTN-11-8-(164) : Colour washing two coats with approved Colour and
quality to give an even shade after thoroughly brushing the surface to
remove all dirt and remains of loose powdered materials including cost of all
materials, labour charges and incidental such as scaffolding, lift charges etc.,
complete for finished item of work, but excluding conveyance charges of Data- Bld -
60
materials
Pillars Qty 2 x 40 0.35 1.35 37.80 Sqm Err:509 1 Sqm

447524687.xlsx-Park-Mythrivanam 2127
Page 2128 of 2191
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
14 Supplying and fixing of MS Gate using 45 x 45 x 6mm MS equal angle
alround and 2 Nos 35x35x5mm Equal angles horizontal supports at 0.50m
c/c, 2.00mm MS sheet at bottom 0.30m height and 12mm MS square bars
Vertically at 125mm centre to centre including fixing with 4 Nos of MS Z
holdfasts (2 on each side) duly making cutting brick masonry, fixing and
making to original surface neatly and painting gate with one coat of red oxide
primer including cost and conveyance of all materials,Locking arrangment,
Ornamental pieces etc ,cutting, bending, welding including all operational
charges and all labour charges etc., complete for finished item of work. Data- Bld -
87
2 Wings of 90.00 Kg Each ( 1.98m x1.5m ) 2 x 2 90.00 Kg 360.00
for Wicket gate 2 x 1 50.00 Kg 100.00
MS Grills for drain out water- 2 Nos for compound wall @ 15 Kg/each 2 x 2 25.00 Kg 100.00
560.00 Kg Err:509 1 Kg
15 Supplying and fixing of MS Grills as per Drawings including fixing with 4 Nos
of MS Z holdfasts (2 on each side) duly making cutting masonry, fixing and
making to original surface neatly and painting gate with one coat of red oxide
primer including cost and conveyance of all materials,Locking arrangment,
Ornamental pieces etc ,cutting, bending, welding including all operational
charges and all labour charges etc., complete for finished item of work. Data- Bld -
72
MS Grills for compound wall @ 100 Kg/each 1 x 20 80.00 Kg/each 1600.00 Kg Err:509 1 Kg
Sub- Total for Compound wall - A
B Jogging Tracks & Path ways
1 BLD-CSTN-2-1 (9): Earth work excavation and depositing on bank for all lifts
and with an initial lead of 10m including all operational, incidental, labour
charges such as shoring ,sheeting, planking, strutting, etc. complete for
finished item of work including seigniorage excluding dewatering charges etc
as per SS - 20 B (APSS 308). Data- Bld -
1
a For Walking Track
for sectioning and levelling the ground for Pathways 1 x 1 165.00 2.20 0.200 72.60
for kerbing walls on both sides of the path ways 1 x 2 165.00 0.30 0.150 14.85
Total Qty 87.45 Cum Err:509 1 Cum
2 RBR-TSRA-29 : Cast in Situ Cement Concrete M20 Kerb: Construction of
cement concrete kerb with top and bottom width 115 and 165 mm
respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150
mm thick, foundation having 50 mm projection beyond kerb stone, kerb
stone laid with kerb laying machine, foundation concrete laid manually, all data-
complete as per clause 408 MORTH parks-22

447524687.xlsx-Park-Mythrivanam 2128
Page 2129 of 2191
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
for Kerbing of Pathways 1 x 2 165.00 330.00
330.00 Rmt Err:509 1 Rmt

447524687.xlsx-Park-Mythrivanam 2129
Page 2130 of 2191
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
3 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating
each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310) Data- Bld -
10
For levelling the track between walls 1 x 1 165.00 2.20 0.100 36.30
36.30 Cum Err:509 1 Cum
4 BLD-CSTN-3-6 ( 23 ) -Hand mixing up to Plinth Level : Plain Cement
concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse
aggregate ) using 40mm size Hard Granite Machine Crushed Metal including
cost and conveyance of all materials like cement, sand, coarse aggregate
water etc., to site , seigniorage charges on all materials, labour charges ,
for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface
to the required level curing etc., complete for finished item of work.for
foundation and under flooring bed. Data- Bld -
15
a For levelling the walking track between walls 1 x 1 165.00 2.10 0.100 34.65
Total Qty 34.65 Cum Err:509 1 Cum
5 RBR-CCPV-13 - ii: Providing and Laying of Interlocking Concrete Block
Pavements using PHOENIX or equivalent high strength Cement Concrete
interlocking Regular Pavers of 50 mm thickness of M- 40 Grade of which top
12 mm thick shall be for colour pigmentation with imported colours and
white cement to get required reflective glazing inclusive of all taxes - as per
Data- Bld -
drawing and Technical Specification Clause 1504 MORD 124
a for Jogging tracks 1 x 1 165.00 2.00 330.00
Total Qty 330.00 Sqm Err:509 1 Sqm
Sub- Total for Path ways - B
C Greenary & Play Area
1 RBR-HRTC-5:Making lawns including ploughing and breaking of clod,
removal of rubbish, dressing and supplying doobs grass roots and planting at
15 cm apart, including supplying and spreading of farm yard manure at rate
Data -Parks
of 0.18 cum per 100 sqm including maintaning for 1 year. -5
Area as per Drawing 1 x 1 673.00
Play area 1 x 1 106.00
779.00 Sqm 37.60 1 Sqm

447524687.xlsx-Park-Mythrivanam 2130
Page 2131 of 2191
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
2 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating
each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310)

Filling sand - Play Area 1 x 1 37.00 0.30 11.28 Sqm 0.00 1 Sqm

447524687.xlsx-Park-Mythrivanam 2131
Page 2132 of 2191
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
3 RBR-HRTC-8: Planting ( Running metres 200 plants and 800 shrubs in two
rows in one km length of road where width of verge is 3m and above.) and
maintaing for One year of flowering plants and shrubs in central verge as
Data -Parks
per Specification 307 MORTH -8
Area as per Drawing 1 x 1 293.00
293.00 Rmt 124.94 1 Rmt
4 RBR-HRTC-9: Planting of trees by the road side (Avenue trees) in 0.60 m dia
holes, 1 m deep dug in the ground, mixing the soil with decayed farm
yard/sludge manure, planting the saplings, backfilling the trench, watering,
Data -Parks
fixing the tree guard and maintaining the plants for one year -9
Ornamental trees 1 x 29 29.00 Nos 1550.80 1 Nos
5 RBR-HRTC-7: Planting permanent hedges including digging of trenches, 60
cm wide and 45 cm deep, refilling the excavated earth mixed with farmyard
manure, supplied at the rate of 4.65 cum per 100 metres and supplying and Data -Parks
planting hedge plants at 30 cm apart, and maintaining for 1 year - 7 (a)
as per Drawing 1 x 6 213.00 Rmt 222.40 1 Rmt
6 Planting palms including digging of pits 60cm. Cubes, loosening of 15cm.
Bottom red soil, filling with soil with 10 kg Compost + 100 DAP per pit staking
gap filling with in two month after planting.
inside the Lawns and other places 1 x 17 17 Nos 350.00 1 Nos
7 Planting Speciman plants including digging of pits 60cm. Cubes, loosening of
15cm. Bottom red soil, filling with soil with 10 kg Compost + 100 DAP per pit
staking gap filling with in two month after planting.
Golden bamboo 8” 1 x 10 10 Nos 862.50 1 No
Fercaria 2” 1 x 10 10 Nos 1437.50 1 No
Ficus 4” (Verites). 1 x 10 10 Nos 575.00 1 No
Bottle Bush 1 x 12 12 Nos 690.00 1 No
8 BLD-CSTN-2-1 (9) : Earth work excavation for foundations and depositing on
bank for all lifts and with an initial lead of 10m including all operational,
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc.
Data- Bld -
complete for finished item of work including seigniorage excluding
1
dewatering charges etc as per SS - 20 B (APSS 308).
Around the Fountain 1 x 1 19.35 0.30 0.30 1.74
1.74 Cum Err:509 1 Cum

447524687.xlsx-Park-Mythrivanam 2132
Page 2133 of 2191
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
9 BLD-CSTN-3-6 ( 23 ) -Hand mixing up to Plinth Level : Plain Cement
concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse
aggregate ) using 40mm size Hard Granite Machine Crushed Metal including
cost and conveyance of all materials like cement, sand, coarse aggregate
water etc., to site , seigniorage charges on all materials, labour charges ,
for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface
to the required level curing etc., complete for finished item of work.for
foundation and under flooring bed. Data- Bld -
15
Wall foundations -- Around the fountation 1 x 1 19.35 0.30 0.10 0.58
Around the Fountain 0.58 Cum Err:509 1 Cum

447524687.xlsx-Park-Mythrivanam 2133
Page 2134 of 2191
MEASUREMENTS
S.N. Description Nos. Quantity Rate Per
L B D
10 BLD-CSTN-6-12-(67) : Construction of RR Masonary in Cement Mortor
( 1:8 ) Prop using hard granite stone including cost & Conveyance of all
materials like Cement, Sand , Water, Granite Stones, including Seigniorage
Charges on all Materials, ,labour charges for cutting Stones to required size
and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges
curing etc., complete for finished item of Work . Data- Bld -
38
Around the Fountain 1 x 1 19.35 0.30 0.20 1.16
1.16 Cum Err:509 1 Cum
11 BLD-CSTN-6-6-(61) ; Construction of CRS Masonary 2nd Sort in Cement
Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of
all materials like Cement, Sand , Water, Granite Stones, including
Seigniorage Charges on all Materials, ,labour charges for cutting Stones to
required size and shape, mixing of Cement Mortor, Construction, Scaffolding
Charges curing etc., complete for finished item of Work . Data- Bld -
37
Around the Fountain 1 x 1 19.35 0.30 0.60 3.48
Cladding to External walls with Granite stone tiles 8 mm thick (mirror 3.48 Cum Err:509 1 Cum
12 polished of all shades) using cement compatible bonding agent having
acrylic emulsion base set over 12mm thick CM (1:3) base coat and neat grey
cement slurry of honey like consistency spread at the rate of 3.3 kg.s per
sq.mt including fixing with MS clits with anticorrosive coating hold fasts and
using Janatha paste and jointed with white cement paste mixed with pigment
of matching shade to match the shade of granite slabs including cost and
conveyance of all materials and water to work site, including cost of
seigniorage charges on all materials and all operational, incidental, and
labour charges such as mixing mortar, fixing in position, including lift
charges, curing, including cutting the brick masonry walls and redoing the Data- Bld -
same such that the top surface of tiles is to be flushed with plastered 70
surface etc.,Fountain
Around the complete for finished item of work.(APSS No.701 & 707) 1 x 1 19.35 0.60 11.61
11.61 Sqm Err:509 1 Sqm
13 Providing seating area development by providing cast Iron /Cement seats
LS
as directed by Engineer incharge etc, complete.
Sub- Total for Greenary
Total of A+B
Total cost of the estimation Rs.
Say Rs.

447524687.xlsx-Park-Mythrivanam 2134
Page 2135 of 2191
PET MUNICIPALITY
n of Park at Mythrivanam
& ABSTRACT ESTIMATION

Amount

Err:509

Err:509

447524687.xlsx-Park-Mythrivanam 2135
Page 2136 of 2191

Amount

Err:509

Err:509
Err:509

Err:509

Err:509

447524687.xlsx-Park-Mythrivanam 2136
Page 2137 of 2191

Amount

Err:509

Err:509

447524687.xlsx-Park-Mythrivanam 2137
Page 2138 of 2191

Amount

Err:509

Err:509

Err:509

Err:509

447524687.xlsx-Park-Mythrivanam 2138
Page 2139 of 2191

Amount

Err:509

447524687.xlsx-Park-Mythrivanam 2139
Page 2140 of 2191

Amount

Err:509

Err:509
Err:509

Err:509

447524687.xlsx-Park-Mythrivanam 2140
Page 2141 of 2191

Amount

Err:509

447524687.xlsx-Park-Mythrivanam 2141
Page 2142 of 2191

Amount

Err:509

Err:509

Err:509
Err:509

29290.40

447524687.xlsx-Park-Mythrivanam 2142
Page 2143 of 2191

Amount

0.00

447524687.xlsx-Park-Mythrivanam 2143
Page 2144 of 2191

Amount

36607.42

44973.20

47371.20

5950.00

8625.00
14375.00
5750.00
8280.00

Err:509

447524687.xlsx-Park-Mythrivanam 2144
Page 2145 of 2191

Amount

Err:509

447524687.xlsx-Park-Mythrivanam 2145
Page 2146 of 2191

Amount

Err:509

Err:509

Err:509

253000.00
Err:509
Err:509
Err:509
Err:509

447524687.xlsx-Park-Mythrivanam 2146
Page 2147 of 2191

KODADA MUNICIPALITY
Construction of Park at Mythrivanam
PROVIDING Providing Parking inside the Park
S.N. Description of Item Nos L B D Quantity Unit Rate Per
1 RBR-FNDN-1 -manual means : Earthwork excavation for structures in all types of soil as
per drawing and technical specifications including setting out, construction of shoring
and bracing, removal of stumps and other deleterious material and disposal upto a lead
of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable
material as per Technical Specification 305 MORD / 304 MORTH. for Sumps,Thrust Data- Bld,
Sqm S.No. 7
blocks, column pits, Chambers and Man Holes etc. by manual means,
Parking place as per drawing 1 x 1 157.00 0.20 31.40
Drive Way 1 x 1 22.00 4.70 0.20 20.68
52.08 Cum 210.92 1 Cum
2 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and basement
with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer
by watering and ramming including cost and conveyance of water to work site and all
operational, incidental, labour charges, hire charges of T & P etc., complete for finished
item of work. (APSS NO. 309 & 310) Data- Bld -
10
Parking place as per drawing 1 x 1 157.00 0.10 15.70
For levelling the track between walls 1 x 1 22.00 4.60 0.10 10.12
25.82 Cum Err:509 1 Cum
3 BLD-CSTN-3-10- ( 27 ) Hand mixing: Plain Cement concrete nominal mix (1:3:6) prop
(Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine
Crushed Metal including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour charges , for
mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required
level curing etc., complete for finished item of work.for foundation and under flooring
bed.
Parking place as per drawing 1 x 1 157.00 0.10 15.70
Drive Way 1 x 1 22.00 4.60 0.10 10.12
25.82 Cum 4819.01 1 Cum
4 RBR-CCPV-13 - i : Providing and Laying of Interlocking Concrete Block Pavements
using PHOENIX or equivalent high strength Cement Concrete interlocking Regular
Pavers of 80 mm thickness of M- 30 Grade of which top 12 mm thick shall be for colour
pigmentation with imported colours and white cement to get required reflective glazing
inclusive of all taxes - as per drawing and Technical Specification Clause 1504 MORD Data- Bld ,
S.No 38
Parking place as per drawing 1 x 1 157.00 157.00

447524687.xlsx Parking- Mythrivanam


Page 2148 of 2191

S.N. Description of Item Nos L B D Quantity Unit Rate Per


Drive Way 1 x 1 4.50 4.50
161.50 Sqm 760.07 1 Sqm

447524687.xlsx Parking- Mythrivanam


Page 2149 of 2191

S.N. Description of Item Nos L B D Quantity Unit Rate Per


5 RBR-TSRA-29 : Cast in Situ Cement Concrete M20 Kerb: Construction of cement
concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in
M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm
projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation
concrete laid manually, all complete as per clause 408 MORTH Data- Bld ,
S.No 19
Curb wall as per requirement 1 x 1 22.00 22.00 Rmt 286.24 1 Rmt
6 BLD-CSTN-8-2-(77) ; Plastering with 12mm thick in single coat in CM (1:4) finished
smooth including cost and conveyance of all materials to site, seigniorage charges on
all materials, finishing, curing, scaffolding and all operational, incidental, labour charges
etc., including cutting grooves where ever necessary etc., complete for finished item of Data Bld
work. (As per SS 903). per 10 Sqm. S.No 42
outer sides of curb wall above GL 1 x 1 22.00 0.45 9.90
Total 9.90 Sqm 150.75 1 Sqm
7 Carting of surplus excavated rock from the site to a distance suitable including loading,
unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and
other incidental and operational charges etc., complete.
Carting of earth 31.40 Cum 57.10 1 Cum
Total
Total cost of the estimation Rs.
Say

447524687.xlsx Parking- Mythrivanam


Page 2150 of 2191

Amount

10985.00

Err:509

124427.00

447524687.xlsx Parking- Mythrivanam


Page 2151 of 2191

Amount

122751.00

447524687.xlsx Parking- Mythrivanam


Page 2152 of 2191

Amount

6297.00

1492.00

1793.00
Err:509
Err:509
Err:509

447524687.xlsx Parking- Mythrivanam


SIDDIPET MUNICIPALITY
Construction of Park at Mythrivanam
Providing Solar Security Lights / Street Lights .
DETAILED & ABSTRACT ESTIMATE
S.No Description Nos Qty Rate Unit Amount

1 Solar Street Light System With Mounting Structure & Pole ( MNRE Specification
including installation / commissioning. Free delivery at site including freight &
forwarding. Insurance Standard Transit Insurance Clause.
a 2 X 11 W CFL (Single Luminaire with 2 CFL), PV Module: 120 W,Battery Capacity: Rate as per
12 V, 100 AH, Dusk to dawn automatic operation with Tubular battery with 5m pole. DGS & D. RC

Along the Path ways as per requirement 1 x 6 6 Nos 28870.00 1 each 173220.00
b 2 X 11 W CFL (Double Luminaire with 1 CFL each), PV Module: 120 W,Battery
Capacity: 12 V, 100 AH, Dusk to dawn automatic operation with Tubular battery with
5m pole.
Along the Compound wall as per requirement 1 x 5 5 Nos 32200.00 1 each 161000.00
c 1 X 11 W CFL,PV Module: 74 W,Battery Capacity: 12 V , 75 AH, Dusk to dawn
automatic operation with Tubular battery with 5m pole.
inside the premises. 1 x 5 5 Nos 20940.00 1 each 104700.00
For Earth work Excavation (seperate sheet enclosed) 1 x 16 16 Nos #REF! 1 each #REF!
Total Rs. #REF!
Total #REF!
Page 2154 of 2191

SIDDIPET MUNICIPALITY

Construction of Park at Mythrivanam

Detailed and Abstract Estimate for Drilling of Borewells


S.N Description Nos L B D Qty Rate Per
A Drilling of Bore well
1 Drilling of Bore well by down the hole hammer (DTH) drilling to finished dia of
163 mm in all formations to the depth specified and reaming the bores to the
required dia flushing the bore walls at an average pressure of 7 kg/cm2 (100
PSI) conducting yield test, inclusive of transportation from point to point, crew
charges, cost of consumables, shifting of Rig and all other charges etc,.The
bore wells should be true & vertical and work should be carried out to the
satisfaction of the department and carried out as per IS 2800 I & II / 1979
and amendments if any from time to time, the rate is including all taxes etc,.
complete as applicable.
data-Borewells
-Sn - 1
Depth of the Borewells
Point No.1 - up to 90.00m depth 1 x 1 210 90.00 90.00 Rmt LS 1 Rmt
above 90.00m depth 120.00 120.00 Rmt LS 1 Rmt
2 Supplying and fixing of 160mm dia PVC Casing pipe of 6kg/cm2 including
cost and conveyance, all labour charges and central excise duty and sales
data-HDPE &
tax .
PVC Pipes
Depth of the casing as per Geologist report
Point No.1 1 x 1 16.00 16.00
16.00 Rmt #REF! 1 Rmt
3 Manufacture, Supply, Delivery, Installation and Commissioning of
Submersible Pumpset suitable to 163 mm dia Bore wells coupled with Motor
Single Phase 2880 RPM 340 V(-15% + 10% range – 290 to 375 Volts) of
reputed make with minimum overall efficiency of 40% at the duty point with
Radial/Mixed flow and testing commissioning of pumpset with a trial run of
one week in any where Ranga Reddy District. The pump set should confirm
to IS 8034:1989 and motor should confirm to IS 9283:1979 with ISI 2000
Mark with a guarantee period of 18 Months from the date of installation. The
rates are including cost and conveyance of material, all taxes, Surcharges,
VAT, Excise duty, overhead charges and transportation charges etc.,
complete, excluding all accessories: RC Bore
wells-1

Est-Borewells -2 2154
Page 2155 of 2191

S.N Description Nos L B D Qty Rate Per


a 2 HP Single Phase Pump sets to a discharge range of upto 15 to 40 Lpm 1 x 1 1 Nos 15700.00 1 Nos
and a head range of 119 to 50m - Texmo / CRI make

Est-Borewells -2 2155
Page 2156 of 2191

S.N Description Nos L B D Qty Rate Per


4 Supply and delivery of wall mounted Industrial type Control panel board of
size 600x600x250mm made of 18 SWG CRCA sheet steel enclosure, 14
SWG mounting palte for cable entry fabricated, painted with two coats of red
Oxide primer and two coats of final light Grey paint, lock and key
arrangements two side lovures with weld mesh inside etc., completed
consisting of the follwing equipment with all internal wiring using Fine
cab.Finolex cables of suitable size and capacity and cable clamps etc.,
complete for 3-phase power pumps of 415 V-50 HZ for delivery at any where
in A.P.
a) Volt Meter : 0-500 V 96x96mm size 1 No.
b).Ammeter: 0-20 A-1- No.(96x96mm size) upto 7.50HP - 1 No
c) Dry running preventor with elecytrode of suitable range 1 No.
d). Single phasing preventor 1 No.
e) Swith fuse unit with HRC fuses IP & N confirming to IS 4064- 1 set ( 32
AMPS up to 7.5 HP)
f). Indication Lamps(R-Y-B) with dropper resistance 230V-1 set.
g) Holder with Switch controle - 1 No.
h).Voltmeter selector switch - 1 No.
i). Starters-direct-on-line starter in sheet steel enclosure suitable upto 7.50HP
motor rating Ac-3-duty,415V,50Hz 3 phase.
j). Supply and delivery of capacitor as per APSEB rules for LT connections as
per IS: 2834 with dropper resistance, data connection- 2 KVAR suitable
above 3 HP to 6HP and 3 KVAR above 6 HP to 7.50 HP)
RC -2-S.N.1
&4

Panel board up to 7.5HP Motors 1 x 1 1 Nos 6110.00 1 Nos


5 Supply and delivery of suitable flexible pipe to encase the submersible cable
RC -2-S.N.4

1 x 1 15.00 15 Rmt 12.00 1 Rmt


6 Supply abd delivery of PVC insulated and PV sheated flexible 3 core flat type
submersible cables suitable for submersible pumpsets conductors composed
of ennealed high conductivity copper wire, conforming to IS 694 with its
revisions and ammendments from time to time and delivery at site of
installation of pumpset including central excise duty freight and transit
insurances etc., complete (in small quantities) but exclussive APGST RC -2-S.N.6

a 3 core 2.50 Sqmm cable, for bore wells ;


Point No.1 - up to 90.00m depth 1 x 1 210.00 195.00
Say 205.00 Rmt 66.00 1 Rmt

Est-Borewells -2 2156
Page 2157 of 2191

S.N Description Nos L B D Qty Rate Per


7 Manufacture, supply, & delivery of 16Kg/Sqcm HDPE pipes conforming to IS
4984 - 1995 including transportation to any where in A.P, excise duty, sale tax data-HDPE &
etc., complete. PVC Pipes
40mm dia suction pipe 1 x 1 210.00 210.00 Rmt #REF! 1 Rmt

Est-Borewells -2 2157
Page 2158 of 2191

S.N Description Nos L B D Qty Rate Per


8 Supply and delivery of Galvanised Mild steel bends heavy duty " C" class
threaded at both ends at site of work for pump installation including cost and
conveyance of all materials, all taxes and duties and transit insurance etc,
RC -2-S.N.8
complete.
a 50mm dia 900 bends with arm length of 25Cm 2 x 1 2 Nos 180.00 1 Nos
9 Supply and delivery of MS Clamp set 45mm length,12mm thick plate, 75mm
wide with 6Nos of 16mm dia Bolts & Nuts at site of work for pump installation
including cost and conveyance of all materials, all taxes and duties and transit
RC -2-S.N.10
insurance etc, complete.
a 50mm dia 1 x 1 1 Nos 390.00 1 Nos
10 Supply and delivery of 50mm dia MS Flange set (2Nos) of 150mm dia OD
12mm thick of each Flange with 4 Nos 15mm dia bolts and nuts as per RWS
RC includin C/C, transit, insurance all labour charges and taxes and duties
RC -2-S.N.9
etc, complete
a 50mm dia 1 x 1 1 Nos 255.00 1 Nos
11 Supply and delivery of Gate Valves leaded in tin bronze screwed internal
bends, screwed on bonnet internal seat design to IS 778/ 84 with its
ammendments class - 2 of sizes ISI Marked including cost and conveyance,
transit insurance all labour charges and taxes and duties etc., complete.- RC -2-S.N.11

a 50mm dia 1 x 1 1 Nos 1825.00 1 Nos


12 Manufacture, Supply and fixing of Galvanised Mild steel couplings of the
RC -2-S.N.12
fallowing sizes
a 50mm dia 1 x 1 1 Nos 95.00 1 Nos
13 Supply & Delivery of 50mm Dia CI Non-return Valve with ISI Mark. including
cost and conveyance, transit insurance all labour charges and taxes and RC -2-S.N.13
duties etc., complete.
a 50mm dia 3 x 1 3 Nos 845.00 1 Nos
14 Supply & fixing of 50mm Dia MS Galvanised Bore Cover including cost and
conveyance, transit insurance all labour charges and taxes and duties etc., RC -2-S.N.14
complete
Bore cover 1 x 1 1 Nos 170.00 1 Nos
15 Supply and Delivery of MS Angular Stand for fixing of control Panel Board -
MS Angular stand consisting of L Angles of size 40mm x 40mm x 5mm with 2
nos. 6'long verticals and 3 nos. - 2 1/2' long horizontals. The two legs of the
stand firmly fixed in Cement Concrete bed in CC (1:2:4) prop. of size 1m x
0.3m x 0.2m depth below Ground Level. including cost and conveyance,
transit insurance all labour charges and taxes and duties etc., complete RC -2-S.N.15

Est-Borewells -2 2158
Page 2159 of 2191

S.N Description Nos L B D Qty Rate Per


MS Stand 1 x 1 1 Nos 1050.00 1 Nos

Est-Borewells -2 2159
Page 2160 of 2191

S.N Description Nos L B D Qty Rate Per


16 Providing independent Earthing for the Pumpset/ motor using 40mm dia B
class GI Pipe of 2m length duly providing 12mm dia 16nos holes and required
bolts, nuts and washers, check nuts humbe pipe ring etc., as per IS
specifications with necessary double GI wire no.8 SWG including filling with
equal proportion of salt and Charcoal in layers and all labour charges etc.,
complete. RC -2-S.N.16

Earthing 1 x 1 1 Nos 1700.00 1 Nos


17 Supply and Delivery of 7/20 Service Wire of repute make as per IS Code
including cost and conveyance, transit insurance all labour charges and taxes RC -2-S.N.17
and duties etc., complete.
7/20 Service wire - ISI marked 1 x 1 250.00 250.00 Rmt 17.00 1 Rmt
18 Supply and Delivery of 12" long GI NIPPLE including cost and conveyance, RC -2-S.N.18
transit insurance all labour charges and taxes and duties etc., complete.
a 50mm dia 1 x 1 1 Nos 120.00 1 Nos
19 Installation, Testing, Trail Run and Commissioning of Submersible Pumps set RC -2-S.N.19
with all accessories as per the standard specifications.
Commissioning and testing 1 x 1 1 Jobs 2450.00 1 Jobs
B Laying GI Lines
20 RBR-FNDN-1: Earthwork in excavation in all types of soils for pipeline
trenches as per specification drawings and as directed by the departmental
officer and protecting the walls and other structures etc.,so as not to disturb
the existing utility services i.e water spply and sewer pipe lines ,telephone,
and power supply cables/ducts,strom water drains, traffic signals etc., during
laying of Pipe lines taking all precautionary measures in the restricted areas
for laying sewer/watermains including divertion of traffic and backfilling in
trenches with excavated suitable material and and disposal of remaining
earth upto a lead of 50 m, including all incidental and operational charges
etc., complete for Pipe Lines,
data-bld -
Sn-7
from bore wells to Cisterns 1 x 1 173.00 0.45 0.75 58.39 Cum 210.92 1 Cum

Est-Borewells -2 2160
Page 2161 of 2191

S.N Description Nos L B D Qty Rate Per


21 Supply of Galvanised Mild steel pipes (Medium class of the followingt nominal
more confirming to IS 1239/ Part-1/1990 continuoulsy welded ERW?HFTW,
Type and screwd at both ends as per IS 554 one end fitted with Socket
( Heavy class) as per IS 1239/ part-11/1992 and other end fitted with plastic
Ring and delivery in small quantities at work site of pump installation with
replacement guarantes for a period of six month on istallation (Good indian
make with ISI mark for exact lengths of 3 meters + 5% including cost,
conveyance, Central Excise duty and sales Tax etc., complete for every meter
as per ISI spectification of wall thickness and weight of pipe.
data - water
suply
50mm dia GI pipe 1 x 1 43.25 43.00 Rmt 486.27 1 Rmt
20mm dia GI pipe 1 x 1 129.75 130.00 Rmt 215.87 1 Rmt

Say Rs.

Est-Borewells -2 2161
Page 2162 of 2191

PET MUNICIPALITY

on of Park at Mythrivanam

Estimate for Drilling of Borewells


Amount

27450.00
36600.00

#REF!

Est-Borewells -2 2162
Page 2163 of 2191

Amount
15700.00

Est-Borewells -2 2163
Page 2164 of 2191

Amount

6110.00

180.00

13530.00

Est-Borewells -2 2164
Page 2165 of 2191

Amount

#REF!

Est-Borewells -2 2165
Page 2166 of 2191

Amount

360.00

390.00

255.00

1825.00

95.00

2535.00

170.00

Est-Borewells -2 2166
Page 2167 of 2191

Amount
1050.00

Est-Borewells -2 2167
Page 2168 of 2191

Amount

1700.00

4250.00

120.00

2450.00

12316.00

Est-Borewells -2 2168
Page 2169 of 2191

Amount

20910.00
28063.00
#REF!
#REF!

Est-Borewells -2 2169
Page 2170 of 2191

SIDDIPET MUNICIPALITY
Construction of Park at Mythrivanam

Detailed and Abstract Estimate for Rain Water Harvesting Structure


S.No Description of Work Nos Length Width Depth Quantity Rate Per
1 BLD-CSTN-2-2(10) : Earth work excavation for foundations and
depositing on bank for all lifts and with an initial lead of 10m including
all operational, incidental, labour charges such as shoring ,sheeting,
planking, strutting, etc. complete for finished item of work including
seigniorage excluding dewatering charges etc as per SS - 20 B (APSS data-
308). RWHS- Sn-
2
for recharge pit 1 x 1 2.00 2.00 2.00 8.00
for Brick work around the pit - Long walls 1 x 2 3.46 0.30 0.40 0.83
for Brick work around the pit - Short walls 1 x 2 3.00 0.30 0.40 0.72
Total Qty 9.55 Cum #REF! 1 Cum
2 BLD-CSTN-2-8 (16) :Supply, Filling and packing Rough / soling stone
in readymade trench icluding cost and conveyance of all material and
all labour charges etc for water harvesting structure., for finished item data-
RWHS- Sn-
of work. (APSS NO. 309 & 310) 6
1 x 1 2.00 2.00 1.00 4.00 Cum #REF! 1 Cum
3 BLD-CSTN-2-8 (16) :Supply, Filling 65mm metal in readymade trench
icluding cost and conveyance of all material and all labour charges etc
for water harvesting structure., for finished item of work. (APSS NO. data-
RWHS- Sn-
309 & 310) 7
1 x 1 2.00 2.00 0.50 2.00 Cum #REF! 1 Cum
4 BLD-CSTN-2-8 (16) :Supply, Filling 40mm metal in readymade trench
icluding cost and conveyance of all material and all labour charges etc
for water harvesting structure., for finished item of work. (APSS NO. data-
RWHS- Sn-
309 & 310) 8
1 x 1 2.00 2.00 0.25 1.00 Cum #REF! 1 Cum
5 BLD-CSTN-2-8 (16) :Supply, Filling 20mm metal in readymade trench
icluding cost and conveyance of all material and all labour charges etc
for water harvesting structure., for finished item of work. (APSS NO. data-
RWHS- Sn-
309 & 310) 9
1 x 1 2.00 2.00 0.25 1.00 Cum #REF! 1 Cum

RWHS-Mythrivanam 447524687.xlsx 2170


Page 2171 of 2191

S.No Description of Work Nos Length Width Depth Quantity Rate Per
6 Supply, Filling Sand in readymade trench including cost and
conveyance of all material and all labour charges etc for water
harvesting structure in complete shape. C-Mat
1 x 1 3.00 3.00 0.25 2.25 Cum #REF! 1 Cum

RWHS-Mythrivanam 447524687.xlsx 2171


Page 2172 of 2191

S.No Description of Work Nos Length Width Depth Quantity Rate Per
7 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain
Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded
Metal including cost and conveyance of all materials like cement, sand,
coarse aggregate water etc., to site , seigniorage charges on all
materials, labour charges , for mixing , laying, concrete , ramming in
15 cm layers, finishing top surface to the required level curing etc.,
complete for finished item of work with nomonal reinforcement

CC Bed below Brick wall - Below Long walls 1 x 2 3.46 0.30 0.05 0.10
CC Bed below Brick wall - Below Short walls 1 x 2 2.00 0.30 0.05 0.06
0.16 Cum 5044.84 1 Cum
8 BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or
treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost
& conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to
site cost of Seigniorage charges on all materials, including all labour
charges like mixing Cement Mortor, scaffoding charges lift charges ,
curing charges etc., complete for finished item of work

Brick Walls - Long walls 1 x 2 3.46 0.23 0.70 1.11


1 x 2 2.00 0.23 0.70 0.64
Deduction for openings at 4 sides above GL -1 x 4 0.46 0.23 0.10 -0.04
1.71 Cum 5455.18 1 Cum
9 BLD-CSTN-8-2-(77) : Plastering with 12mm thick in single coat in CM
(1:4) finished smooth including cost and conveyance of all materials to
site, seigniorage charges on all materials, finishing, curing, scaffolding
and all operational, incidental, labour charges etc., including cutting
grooves where ever necessary etc., complete for finished item of work.
(As per SS 903). per 10 Sqm.

Inner side - Long walls 1 x 2 3.00 0.60 3.60


Inner side - Short walls 1 x 2 2.40 0.60 2.88
Outer side - Long walls 1 x 2 3.46 0.10 0.69
Outer side - Short walls 1 x 2 3.00 0.10 0.60
Top facing of Long wall 1 x 2 3.46 0.23 1.59
Top facing of Short wall 1 x 2 3.00 0.23 1.38
10.74 Sqm 150.75 1 Sqm

RWHS-Mythrivanam 447524687.xlsx 2172


Page 2173 of 2191

S.No Description of Work Nos Length Width Depth Quantity Rate Per
10 BLD-CSTN-3-16-(31)-C; Supply and placing of the M-20 Design Mix
Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER
with 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site and including Seigniorage charges, sales & other taxes on
all materials including all operational, incidental and labour charges
such as weigh batching, machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for
finished item of work (APSS No. 402)with minimum cement content as
per IS code from standard suppliers approved by the department
including pumping, centering, shuttering, laying concrete, vibrating,
curing etc. complete but excluding cost of steel and its fabrication
charges for finished item of work. for RCC SLABS, BEAMS

RCC Precast Perforated Slabs of 100mm thick 1 x 1 3.00 3.00 0.10 0.90 Cum 11093.79 1 Cum
11 BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/
Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe
415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC
works , including labour charges for straightening, cutting, bending to
required sizes and shapes, placing in position with cover blocks of
approved materials and size and tying and lap-splicing with binding
wire of 18 SWG, forming grills for reinforcement work as per approved
designs and drawings, including cost and conveyance of steel bars,
including all wastages such as overlaps, couplings, chairs, spacer bars
including cost and conveyance of binding wire, cover blocks and all
incidental, operational, labour charges such as cutting, bending,
placing in position, tying including sales and other taxes on all materials
etc., complete for finished item of work in all floors.( APSS No.126

for RCC Precast Perforated Slabs @ 40 Kg/Cum 1 x 1 0.090 50.00 Kg/Cum 4.50 Kg 68.71 1 Kg

RWHS-Mythrivanam 447524687.xlsx 2173


Page 2174 of 2191

DDIPET MUNICIPALITY
ction of Park at Mythrivanam

timate for Rain Water Harvesting Structure


Amount

#REF!

#REF!

#REF!

#REF!

#REF!

RWHS-Mythrivanam 447524687.xlsx 2174


Page 2175 of 2191

Amount

#REF!

RWHS-Mythrivanam 447524687.xlsx 2175


Page 2176 of 2191

Amount

807.00

9328.00

1619.00

RWHS-Mythrivanam 447524687.xlsx 2176


Page 2177 of 2191

Amount

9984.00

309.00
#REF!
#REF!

RWHS-Mythrivanam 447524687.xlsx 2177


Page 2178 of 2191

Construction of Divider and central lighting


Construction of Park behind Sai Techno School at APHB Colony
Providing Interlocking Tiles for Parking
S.N. Description of Item Nos L B D Quantity Unit Rate Per
1 RBR-FNDN-1 -manual means : Earthwork excavation for structures in all types of soil as
per drawing and technical specifications including setting out, construction of shoring
and bracing, removal of stumps and other deleterious material and disposal upto a lead
of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable
material as per Technical Specification 305 MORD / 304 MORTH. for Sumps,Thrust Data- Bld,
Sqm S.No. 7
blocks, column pits, Chambers and Man Holes etc. by manual means,
Parking place as per drawing 1 x 1 0.20 0.20 Cum 210.92 1 Cum
2 BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and basement
with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer
by watering and ramming including cost and conveyance of water to work site and all
operational, incidental, labour charges, hire charges of T & P etc., complete for finished
item of work. (APSS NO. 309 & 310) Data- Bld -
10
Parking place as per drawing 1 x 1 0.10 0.10
0.10 Cum 910.40 1 Cum
3 BLD-CSTN-3-10- ( 27 ) Hand mixing: Plain Cement concrete nominal mix (1:3:6) prop
(Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine
Crushed Metal including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour charges , for
mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required
level curing etc., complete for finished item of work.for foundation and under flooring
bed.
Parking place as per drawing 1 x 1 0.10 0.10 Cum 4819.01 1 Cum
4 RBR-CCPV-13 - i : Providing and Laying of Interlocking Concrete Block Pavements
using PHOENIX or equivalent high strength Cement Concrete interlocking Regular
Pavers of 80 mm thickness of M- 30 Grade of which top 12 mm thick shall be for colour
pigmentation with imported colours and white cement to get required reflective glazing
inclusive of all taxes - as per drawing and Technical Specification Clause 1504 MORD Data- Bld ,
S.No 38
Parking place as per drawing 1 x 1 1.00 Sqm 760.07 1 Sqm

447524687.xlsx Path Ways (2)


Page 2179 of 2191

S.N. Description of Item Nos L B D Quantity Unit Rate Per


5 RBR-TSRA-29 : Cast in Situ Cement Concrete M20 Kerb: Construction of cement
concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in
M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm
projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation
concrete laid manually, all complete as per clause 408 MORTH Data- Bld ,
S.No 19
Curb wall as per requirement 1 x 1 1.00 Rmt 286.24 1 Rmt
6 BLD-CSTN-8-2-(77) ; Plastering with 12mm thick in single coat in CM (1:4) finished
smooth including cost and conveyance of all materials to site, seigniorage charges on
all materials, finishing, curing, scaffolding and all operational, incidental, labour charges
etc., including cutting grooves where ever necessary etc., complete for finished item of Data Bld
work. (As per SS 903). per 10 Sqm. S.No 42
outer sides of curb wall above GL 1 x 1 0.45 0.45
Total 0.45 Sqm 150.75 1 Sqm
7 Carting of surplus excavated rock from the site to a distance suitable including loading,
unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and
other incidental and operational charges etc., complete.
Carting of earth 0.20 Cum 57.10 1 Cum
Total
Total cost of the estimation Rs.
Say

447524687.xlsx Path Ways (2)


Page 2180 of 2191

Amount

42.00

91.04

482.00

760.00

447524687.xlsx Path Ways (2)


Page 2181 of 2191

Amount

286.00

68.00

11.00
1740.04
1740.04
0.02 Lakhs

447524687.xlsx Path Ways (2)


7 Dense Graded Bituminous Macadam
Providing and laying dense graded bituminous macadam with 100-
120 TPH batch type HMP producing an average output of 75 tonnes
RBR-BASC-7 per hour using crushed aggregates of specified grading, premixed
with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix
and filler, transporting the hot mix to work site, laying with a
hydrostatic paver finisher with sensor control to the required grade,
level and alignment, rolling with smooth wheeled, vibratory and
tandem rollers to achieve the desired compaction as per MoRTH
specification clause No. 507 complete in all respects.

Unit = cum
Taking output = 195 cum (450 tonnes)
a) Labour
Mate day -
Mazdoor (Unskilled) working with HMP, mechanical broom, day 16.000 510.000
paver, roller, asphalt cutter and assistance for setting out
lines, levels and layout of construction
Skilled mazdoor for checking line & levels day 5.840 540.000
b) Machinery
Batch mix HMP @ 75 tonne per hour hour 6.000 24268.160
Paver finisher hydrostatic with sensor control @ 75 cum per hour hour 6.000 3426.651

Generator 250 KVA hour 6.000 2072.000


Front end loader 1 cum bucket capacity hour 6.000 1843.520
Tipper 10 tonne capacity t.km 7200.000 6.000

Add 10 per cent of cost of carriage to cover cost of loading


and unloading
smooth wheeled roller 8-10 tonnes for initial break down hour 3.900 1342.300
rolling.
Vibratory roller 8 tonnes for intermediate rolling. hour 3.900 2878.900
Finish rolling with 6-8 tonnes smooth wheeled tandem roller. hour 3.900 1843.520

c) Materials
Bitumen @ 4.25 per cent of weight of mix t 19.130 31710.000
Aggregate
Total weight of mix = 450 tonnes
Weight of bitumen = 19.13 tonnes
Weight of aggregate = 450 -19.13 = 430.87 tonnes
Taking density of aggregate = 1.5 ton/cum
Volume of aggregate = 287.25 cum
Grading - II 19 mm (Nominal Size)
25 - 10 mm 30 per cent cum 86.160 1084.950
10 - 5 mm 28 per cent cum 80.430 859.950
5 mm and below 40 per cent cum 114.900 774.950
Filler @ 2 per cent of weight of aggregates (Cement). t 8.620 4750.000
Any one of the alternative may be adopted as per approved
design
Total
d&e) Overheads & Contractors Profit 13.62%
Cost for 195 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/195
14 Providing and laying of Dense Graded Bituminous Macadam with 100 - 120 TPH batch type hot mix plant producing an
average output of 75 tones per hour using hard blasted granite crushed aggregates of Grading - II as per table 500-10
of MoRT&H Specification 505 (5th revision) premixed with bituminous binder of VG 30 grade @ 4.50% of weight of total
mixture, transported to site, laid over a previously prepared surface with a hydrostatic paver finisher with sensor control
to the required grade, level and alignment and rolled as per Clauses 501.6 and 501.7 to achieve the desired compaction
for finished item of work as directed by the Engineer-in-Charge including hire and operational charges all T&P and all
other contingent charges necessary including cost of (excluding seigniorage) charges of all materials etc., complete in all
respects as directed by Engineer-in-Charge and as per MoRT&H specification No. 505 (5th Revision)

Page 132,133 of MoRT&H SDB


Unit = cum
Taking out put = 195 cum (450 ton)
(A) Labour
0.84 nos. Mate 540.00 nos. 453.60
16.00 nos. Mazdoor working with HMP, mechanical broom, paver, roller, 510.00 nos. 8160.00
asphalt cutter and assistance for setting out lines, levels and
layout of construction.
5.00 nos. Mazdoor skilled 540.00 nos. 2700.00
TOTAL 11313.60
(B) Machinery
6.00 hour Batch mix Hot Mix Plant @ 75 Tonne per hour 24268.16 hour 145608.96
6.00 hour Paver finisher hydrostatic with sensor control 3426.65 hour 20559.91
6.00 hour Generator 250 KVA 2072.00 hour 12432.00
6.00 hour Front end loader 1 cum bucket capacity 1843.52 hour 11061.12
3.90 hour Smooth wheeled roller 8-10 tonesfor initial break down rolling 1342.30 hour 5234.97

3.90 hour Vibratory roller 8 tones for intermediate rolling 2878.90 hour 11227.71
3.90 hour Finish rolling with 6-8 tones smooth wheeled tandem roller 1843.52 hour 7189.73

7200.00 TKl Tipper 6.00 TKl 43200.00


TOTAL B= 256514.40
(C) Material
19.13 MT Wt. of Bitumen = 450 x 4.5/100 = 20.25 MT 31710.00 1.00 606612.30
ii) Aggregate
TOTAL weight of mix = 450 tones
weight of bitumen = 450*4.5 / 100 = 20.25 tones
Weight of aggregate = 450-20.25 = 429.75 tones
Taking density of aggregate = 1.5 ton/cum
Volume of aggregate = 286.50 cum
Grading - II (19 mm nominal size)
86.16 cum IRC & MORT&H HBG M/C chips 25-10 mm @ 30 % 1084.95 cum 93479.29
80.43 cum IRC & MORT&H HBG M/c Chips 10 - 5 mm @ 28 % 859.95 cum 69165.78
114.90 cum IRC & MoRTH HBG M/C Chips 5mm & below @ 40 % 774.95 cum 89041.76
8.62 cum Filler @ 2% of weight of aggregates. 4750.00 cum 40945.00
TOTAL C= 899244.13
(A + B +C) 1167072.13
Rate per 195 Cum 1167072.13
13.615% c&d) Overheads & Contractors Profit 158896.87
1325969.00
Rate per 1 Cum 6799.84
9 Bituminous Concrete
Providing and laying bituminous concrete with 100-120 TPH
batch type hot mix plant producing an average output of 75
tonnes per hour using crushed aggregates of specified
RBR-BASC-9 grading, premixed with bituminous binder @ 5.4 to 5.6 per
cent of mix and filler, transporting the hot mix to work site,
laying with a hydrostatic paver finisher with sensor control to
the required grade, level and alignment, rolling with smooth
wheeled, vibratory and tandem rollers to achieve the desired
compaction as per MORTH specification clause No. 509
complete in all respects

Unit = cum
Taking output = 191 cum (450 tonnes)
a) Labour
Mate day -
Mazdoor (Unskilled) working with HMP, mechanical broom, day 16.000 510.000
paver, roller, asphalt cutter and assistance for setting out
lines, levels and layout of construction
Skilled mazdoor for checking line & levels day 5.840 540.000
b) Machinery
Batch mix HMP @ 75 tonne per hour hour 6.000 24268.160
Paver finisher hydrostatic with sensor control @ 75 cum per hour hour 6.000 3426.651

Generator 250 KVA hour 6.000 2072.000


Front end loader 1 cum bucket capacity hour 6.000 1843.520
Tipper 10 tonne capacity t.km 450 x L
Add 10 per cent of cost of carriage to cover cost of loading
and unloading
Smooth wheeled roller 8-10 tonnes for initial break down rolling. hour 3.900 1342.300

Vibratory roller 8 tonnes for intermediate rolling. hour 3.900 2878.900


Finish rolling with 6-8 tonnes smooth wheeled tandem roller. hour 3.900 1843.520
c) Material
i) Bitumen@ 5 per cent of weight of mix t 22.500 31710.000
ii) Aggregate
Total weight of mix = 450 tonnes
Weight of bitumen = 22.5 tonnes
Weight of aggregate = 450 -22.50 = 427.50 tonnes
Taking density of aggregate = 1.5 ton/cum
Volume of aggregate = 285 cum
Grading - II-13 mm (Nominal Size)
13.2 - 10 mm 30 per cent cum 85.500 993.700
10 - 5 mm 25 per cent cum 71.250 859.950
5 mm and below43 per cent cum 122.550 774.950

Filler @ 2 per cent of weight of aggregates.(Cement) t 8.620 4750.000


(ii) For Grading-II(13 mm nominal size)
d&e) Overheads & Contractors Profit 13.615%
Cost for 191 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/191
Providing and laying of Bituminous Concrete with 100 - 120 TPH batch type hot mix plant producing an
average output of 75 tones per hour using hard blasted granite crushed aggregates of Grading – II as per
Table 500-17 of specification 507 of MoRT&H (5th revision), premixed with Bituminous binder of VG 30
Grade @ 5.4 % of mix and filler, transporting the hot mix to work site, laying with hydrostatic sensor paver
finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem
rollers to achieve the desired compaction as per MoRT&H Specification 507 (5th revision) complete for
finished item of work in all respects as directed by Engineer-in-Charge

15
Page 138,139,140 of MoRT&H SDB
Unit = cum
Taking output = 191 cum (450 tones.)
(A) Labour
0.84 nos. Mate 540 nos. 453.60
8160.00

Mazdoor working with HMP, Mechanical broom,


paver, roller, asphalt cutter and assistance for setting
16 nos. outlines, levels and layout of construction. 510 nos.
5 nos. Skilled Mazdoor for checking line and levels. 540 nos. 2700.00
TOTAL A= 11313.60
(B) Machinery
6 hour Batch mix Hot Mix Plant @ 75 Tonne per hour 24268.160 hour 145608.96
6 hour Paver finisher hydrostatic with sensor control 3426.651 hour 20559.91
6 hour Generator 250 KVA 2072.000 hour 12432.00
6 hour Front end loader 1 cum capacity 1843.520 hour 11061.12
5234.97
Smooth wheeled roller 8-10 tonnes for initial break
3.9 hour down rolling. 1342.300 hour
3.9 hour Vibratory roller 8 ton for intermediate rolling 2878.900 hour 11227.71
7189.73
Finish rolling with 6-8 ton. smooth wheeled tandem
3.9 hour roller 1843.520 hour
TOTAL B= 213314.40
(C) Material
Bitumen VG 30 @ 5.40 %
22.5 MT Wi. of Bitumen = 450 x 5.4 / 100 = 24.30 MT 32510 MT 731475.00
ii) Aggregate
TOTAL weight of mix = 450 tones
Weight of bitumen - 24.30 tones
Weight of aggregate = 450-24.30 = 425.70 tones
Taking density of aggregate = 1.5 ton/cum
Volume of aggregate = 283.8 cum
Grading - II (13 mm nominal size)
84961.35
85.5 cum IRC & MORT&H HBG M/C chips 13.2-10 mm @30% - 993.700 cum
71.25 cum IRC & MORTH HBG M/C Chips 10 - 5 mm @ 25 % - 859.950 cum 61271.44
94970.12
122.55 cum IRC & MORTH HBG M/C Chips 5 mm & below @ 43% 774.950 cum
8.62 cum Filler @ 2% of weight of aggregates. 4750.000 cum 40945.00
TOTAL C= 1013622.91
(A + B +C) 1238250.91
Rate per 191 Cum 6482.9890576
0.13615 c&d) Overheads & Contractors Profit 882.65896019
7365.6480178
Rate per 1 Cum 7365.6480178
8160.000

3153.600

145608.960
20559.910

12432.000
11061.120
43200.000

5234.970

11227.710
7189.730

606612.300

93479.290
69165.780
89041.760
40945.000

1167072.130
158896.870
1325969.000
6799.840
8160.000

3153.600

145608.960
20559.910

12432.000
11061.120

5234.970

11227.710
7189.730

713475.000

84961.350
61271.440
94970.120
40945.000
1220250.910
166137.161
1386388.071
7258.580