10MW Solar Power Assessment & Synopsis (SPAnS) Report

Client Name: TECSOK, Bangalore


Project Location: Bagalore
Company Name Bangalore Site & Meteo Details
Address Details Location coordinates 13°'N, 77°6'E
Ambient Temperature Max Average Min
0
Country India ( C) 28.1 24.1 21.1
Contact Number Relative humidity 68.6%
E-mail ID Daily Solar irradiation- 5.32 Kw-hrs/m2/day
Website address Horizontal
Project Location bangalore Atmospheric Pressure 93.9 kPA
Project Capacity (in KWp) 10,000 Wind Speed 1.9 m/s
Grid Voltage 33KV Earth temperature Max Average Min
Required Land 45 acres (0C) 32.5 27.6 23.8
Type of Utilization Utility Scale Height from sea level 921m

Overall Power plant performance Summery


Nominal PV power 10000 KWp Location Overview
Max. PV power output 10,068 KWdc
Nominal AC power 10800 KWac
Max operating power @ STC 9046 KWdc Energy generated per Gross Income per
Month
month month @INR 8/KWh
Plant production 15773 MWh/year
January 1374289 10994312
Specific production 1577 KWh/KWp/year February 1448701 11589608
Normalized production 4.32 kWh/KWp/day March 1650277 13202216
Array losses 1.16 KWh/Kp/day April 1521640 12173120
System losses 0.14 KWh/KWp/day May 1429414 11435312
Performance ratio 0.769 June 1226413 9811304
Financial Overview July 1212508 9700064
68 crores INR August 1266386 10131088
Cost of Project
2.04 crores INR September 1280525 10244200
O&M cost per year
INR 8 per KWh October 1207019 9656152
PPA rate (assumed)
Revenue earned per year INR 126,184,000 November 1047881 8383048
EBITDA INR 105,784,000 December 1107606 8860848

3D Model of Power Plant @__Tilt Angle

TOP VIEW of Proposed Power Plant

Designed By
Checked By Amrit Mandal
Rev. No. 1.00
Dated: __/__/2015
E-Mail ID: info@indecons.co
Website: https://indecons.co
Solar PV Module Specification & Array Design Criteria Solar Inverter Design Criteria
Required Electrical Characteristics of SPV Modules Required Operating condition Details Inverter Type String Inverter (MPPT)
Quantity 53
Design criteria IEC-61853-1, IEC 61215, Maximum System Voltage 1000V INPUT (DC)
(IEC)
IEC 61646, IEC 62108 Max absolute Input Voltage 1000V
Maximum Fuse Rating 15A
MPPT input DC range 585 to 850V @ 1050KW
Watt Peak 250Wp Limiting Reverse Current 15A
Operating temp Range (-10 to 60)0C Nominal MPP voltage range 470V-900V
VOC 37.20V Max Input Current per module (Idcmax,m) 694A
Max Static Load Front 5500PA
VMPP 30.10V (Snow +Wind) Max combined DC input current 2082A (3x694A)
ISC 8.87A Max Static Load Rear (wind) 2500PA Nos. of Independent MPP inputs 15
IMPP 8.30A OUTPUT (AC)
Required Temperature Co-eff. characteristics @STC Rated Output Power @p.f=1 1170KW
Module Efficiency/module 15% Max. Apparent AC Power
0
NOCT ( C) 45 ± 2 C 0 1170KVA
area
Power Threshold 20W
Power Tolerance ±2% Module Efficiency (%/0C) -0.07 ± 0.01
Nominal AC Voltage 690V
Temp. Co-Eff. Pmax (%/0C) -0.43 ± 0.05 AC Power Frequency/ range 50Hz
Technology Si-Poly
Temp. Co-eff of Voc (%/0C) -0.34 ± 0.05 Max. output current 975A
No. of cells 60 cells in series Temp. Co-eff of Isc (%/0C) 0.065 ± 0.05 Fault Current 1554
Feed-In phases/connection phases 3-phase 3W+PE
PV Module Power Output @different Irradiation Level Efficiency
Max. Efficiency 98.7%
PV Module Behavior at different irradiance level Inverter Connection Details
Total nos. of inverter 53
PV Parameters @ 1000W/m2 @ 800 W/m2 @ 400 W/m2 Nos. of strings per inverter 4
PMPP 249.8.2W 200.6 W 100.00 Connection of strings/inverter Parallel
VOC 37.2V 36.8 V 35.8V Inter-inverter connection Parallel into Cu busbar
VMPP 30.1V 30.2 V 30.1V Inter-Inverter isolator Provided
ISC 8.87A 6.64A 3.55A
IMPP 8.31A 7.10A 3.33A
Module efficiency 15.54% 15.32% 15.27%
Temperature co-eff -0.43%/0C -0.43%/0C -0.44%/0C

SPV Array Mounting Structure Design Criteria

Installation Site Open terrain – ground mount


Installation Angle 5~60degrees
PV Modules Framed, unframed
Standards & Material Details of SPVMMS Module Orientation Portrait or landscape
AS/NZS 1170
Ground Clearance 300~800mm
Standards DIN 1055
Post Driving Depth 1500~2500mm Designed By
JIS C 8955: 2011
Wind load 160 km/h (45 m/s) Checked By Amrit Mandal
Extruded aluminum Rev. No. 1.00
Profile Hop-dip Galvanized Steel (Q235) Snow load 2400 Pa (approx. 50 cm of snow) Dated: __/__/2015
E-Mail ID: info@indecons.co
Materials Fasten Part: Totally anodized(6005-T5) Seismic stability Zone2 Website: https://indecons.co
Components Specification Quantity Suggested Manufacturers/Suppliers of PV Plant’s Components Global Horizontal Irradiance @different Tilt
Month
Solar PV modules Max Peak 40,000 Angles (KWh/m2/day)
Component Suggested Companies Country
Voc= 36V ;Vmp= 4° 13° 29° Optimized thru ‘out the year
Solar PV Modules First Solar USA
Isc= 9.25A ; Imp= January 5.96 6.41 6.51 39
Canadian Solar Canada
Non-Modular Components ReneSola China February 6.56 6.79 6.8 30
Components Electrical Specification Quantity TATA Solar India March 6.72 6.61 6.73 16
ABB PowerOne Switzerland
Inverters 1170KW, 3Phase &MPPT; 9 April 6.31 5.87 6.43 0
Schneider Electric France
Vmax= 800V Inverters May 6.05 5.82 6.06 9
Fronius USA
Transformer 6.25MVA 2 SMA Germany June 4.99 4.85 4.99 11
SCADA/Monitoring Integrated with Remote 1 RefuSol (Advanced Energy) Germany July 4.48 4.34 4.49 9
Mounting Structures Wind&Sun United Kingdom
System Monitoring system web based August 4.49 4.27 4.53 3
Satec India
Circuit Breaker Vacuum Circuit Breaker; Cables Havells India September 4.91 4.73 4.93 8
Finolex India October 4.77 4.79 4.81 22
SF6 Circuit Breaker
RR Kabel India November 4.9 5.13 5.15 34
DC Disconnect 1000V,20Amps Misc Electrical Schneider Electric France
Equipments
December 5.32 5.74 5.86 41
ABB Switzerland
Isolator DPDT, rated V=33KV, Max 36KV, Total annual
Control System Schneider Electric France 5.45 5.44 5.6 18.4
50Hz, Isc (1sec)= 20KA average
ABB Switzerland
Cables DC Side= 10 mm2 As per survey IEC Standards To Follow During Product
2
AC Side=LT: 16mm & HT:185mm 2
Selection, System Design & Installation Average Daily Max & Min Temperature

Components Certifications t

Solar PV module IEC 61215, IEC 61646, Use of RFID is mandatory in all types of PV
IEC 62108 modules, regardless of their capacity, when used in
such systems.
Solar inverter Inverter should also qualify damp heat cycling/study
IEC 61683, IEC 60068 state and thermal cycling (as per the relevant
standard). It should also qualify the hammer test and
robustness of terminations and drop test.
Yearly Sunshine Duration Housing The field and array junction boxes have to
IP65 standard, comply with IP65 standard. The electronics,
IP including inverters, CPU, charge controllers, MPPTs,
and AC & DC distribution boxes, should have IP 21
standards.
Cables, Standards for cables, switches, circuit breakers,
connectors, connectors, junction boxes, and enclosures will
switches & circuit remain the same as in the administrative approval.
breakers All components of the system should conform to
standard, and the composite system should also be
certified with testing laboratories.
SPV system design IEC 62124 and A committee of PV experts/consultants will study the
& installation I standards and identify the minimum requirements,
practices and the same will be intimated.
Energy meters All PV power plants above 1 kWp have to install
IEC 62053-21 energy meters for accounting and also have to
provide energy delivery guarantee for the customers.

Designed By
Checked By Amrit Mandal
Rev. No. 1.00
Dated: __/__/2015