Professional Documents
Culture Documents
Final Toe Wall
Final Toe Wall
672
FINISHED ROAD LEVEL
TOE WALL FINISHED LEVEL
670 GROUND LEVEL
FOUNDING LEVEL
668
666
664
662
660
659.385
662.200
660.845
662.895
661.836
660.452
660.007
659.855
659.639
659.916
661.399
TOE WALL
TOP LEVEL
659.452
660.399
658.639
658.385
661.895
661.200
658.855
660.836
658.916
659.007
659.845
GROUND LEVEL
@ TOE
658.116
658.207
657.585
661.095
660.400
660.036
659.599
658.652
659.045
658.055
657.839
FOUNDING LEVEL
667.087
666.684
667.625
666.953
667.356
667.491
666.818
666.549
667.222
667.760
666.415
FINISHED ROAD
LEVEL 2770
2780
2790
2800
2810
2840
2830
2760
2820
2750
2740
CHAINAGE
CLIENT : AUTHORITY ENGINEER : EPC CONTRACTOR : PROOF CONSULTANT: SAFETY CONSULTANT : DESIGN CONSULTANT : PROJECT : DRAWING TITLE :
DRG. NO. CIPL/D1022/HW/MISC/DEG/
UPGRADATION TO TWO LANE WITH PAVED
SHOULDER CONFIGURATION FROM KUNDAL- TYP. LAYOUT OF TOE WALL UPTO 1M HEIGHT
JHADOL(SECTION OF NH-58E),FROM KM.0+000 DATE :MAY REV: R0
AT CH. 2740 TO CH. 2840
R0 MAY 19 SUBMISSION TO KM 43+900 (DESIGN CHAINAGE),PACKAGE-I DESIGNED DRAWN CHECKED APPROVED
GOVERNMENT OF RAJASTHAN THEME ENGINEERING SERVICE H.G.INFRA ENGG. LIMITED ACCRETE CONSULTING ENGINEERS IN THE STATE OF RAJASTHAN ON EPC MODE.
KHANNA GOYAL DESIGNERS LLP CIVILMANTRA INFRACON PRIVATE AK VK APS AA
REV DATE DESCRIPTION A B C D PUBLIC WORKS DEPARTMENT PVT (P)LTD LIMITED SCALE : AS SHOWN PAPER SIZE : A2