H:\Flooring\Zone - 12,13,14,15\Ground Floor\Zone - 13\Zone - 13 Area - 1\SHS-SD-MG-G01-GL-13FL01-R03.

dwg 1 Jan 20, 2022 - 3:47pm Hazem

Kingdom of Saudi Arabia

SB
75
SB
70 - THIS DRAWING IS INTENDED FOR MARBLE & -
GRANITE FLOORING

SB
65
- ALL END PIECES ARE CUT ON SITE AS PER
SITE CONDITION

- ALL OPENINGS ( Drainage,Electrical, Mechanical-


Etc.) ARE CUT ON SITE AS PER LOCATION & SIZES
SB
60

SB
55
A THASOS

B DARK EMPERADOR

C CARARA

E BLACK GABRO

SB
U

CHR

03 ADDITIONAL THRESHOLD REN JUNE 17,2014


02 UPDATED PRAYER LINE REN 23-11-13
01 REVISED AS CLOUDED, CHANGE OF TILE SIZE REN 23-10-13
0 FIRST ISSUE FOR APPROVAL REN SEPT.2013
-2
FHC

NORTH
SB
SB 85 SB
49 121
SB SB
25 145

SB SB
02 169

SB SB SB
A'
Y E
SB

SB
217

M
SB
U

SB
SB A
SB I
SB Q
Y

1 FLOORING KEY PLAN ZONE 13( AREA-1)


01 SCALE 1:125MTS.

DAR AL-HANDASAH

MARBLE & GRANITE


I n t e r n a t i o n a l Co. Ltd.

SHAMIYA SERVICE BUILDING


GROUND FLOOR ZONE-13 (AREA 1)
FLOOR TILING KEY PLAN
--
SHS-SD-MG-G01-GL-13FL01-R03 03
AS SHOWN 1 OF 05

Cutting List # - 00
SEPT. 2013
REN Eng`r Sayed Mohd. Ali