You are on page 1of 3

DR.

SHAKUNTALA MISHRA NATIONAL REHABILITATION UNIVERSITY

MOHAAN ROAD LUCKNOW.

FACULTY OF ENGINEERING AND TECHNOLOGY

DEPARTMENT OF CIVIL ENGINEERING


INDUSTRIAL TRAINING REPORT HELD AT UTTAR PRADESH RAJKIYA

NIRMAN NIGAM LIMITED LUCKNOW.

TRAINING SITE : U.P.R.N.N.L UNIT-19, DR. RAM MANOHAR


LOHIA INSTITUTE OF MEDICAL SCIENCES PHASE-2, GOMTI
NAGAR EXTENSION NEAR EKANA INTERNATIONAL STADIUM
LUCKNOW.

SUBMITTED TO : SUBMITTED BY :

(Assistant Professor) (Roll no. : xxxxxxxx)


TABLE OF CONTENTS

S.No CONTENTS PAGE NUMBER


1. Table of Contents 1
2. Table of Figures 2
3. Project Details 3
4. Site Location and Map 4-5
5. Acknowledgement 6
6. Abstract 7
7. Introduction 8
8. Presentation of Buildings
9. Protection Measures in Building
Construction
10. Steps Involved in Building Construction
11. Boys/Girls Hostel Building
12. Structural Components (Excavation,
Foundation)
13. Framework (Column, Beam, Slab)
14. Wall Construction
15. Staircases
16. Materials, Machines and Equipments used
in Construction
17. Quality Control Measures
18. Participation
19. Other Photos
TABLE OF FIGURES

S.No CONTENTS PAGE NUMBER


1. Satellite Images of the Location
2. Map Image of the Location
3. Site Building Image (Front View)
4. Protection Equipments
5. Site Building Image (Back View)
6. Piling Process (Drilling)
7. Reinforcement Frame for Piling
8. Column
9. Beam
10. Two Way Slab
11. Wall Construction (Brickwork)
12. Stair Cases
13. Reinforcement (Column + Foundation)
14. Concrete Pump
15. RMC Truck
16. Cranes at Site
17. Construction Quality Control Plans,
Inspection & Test Plans
18. Other Photos
(i) Electric Sub Station
(ii) Raft Foundation in Main Hospital Building
(iii) Monkey Lift
(iv) Stairs Reinforcement