You are on page 1of 6

PAC Inspection for Package No.

-123
Package Name: Press to Talk System, VHF System and Telephone Wiring for BOF & CCP.

Inspection Done For: Press To Talk System (PTT) at BOF & CCM Area.

Duration of Inspection: From 20.10.2019 to 09.11.2019

Participants:1. Byte :
2. Projects :
3. MECON :
4. SMS-II :
5. CED :

Area wise Observations:

CCU:-
CCM Area (Located at Caster 3 PLC Control Room)-
1. 6 nos. of line cards are available in the CCU which can cater up to 48 subscriber
stations. Balance 2 nos. of cards is to be supplied to equip minimum 64 subscriber
stations in totality as per contract.
2. Line card slot L1 is used for interfacing and ICC card is connected.
3. Earthing of UPS System.

BOF Area (located at BOF Old Control Room)-


1. 7 nos. of line cards are available in the CCU which can cater up to 56 subscriber
stations. Balance 1 no. of card is to be supplied to equip minimum 64 subscriber
stations in totality as per contract.
2. Line card slot L1 is used for interfacing and ICC card is connected.
3. Earthing of UPS System.

Common Points for PTT Stations:-


1. Earthing of both the CCU units is not done.
2. Electronic earth pits are to be constructed and connected to CCU.
3. Cable tagging at start & termination points including at 20 mtrs interval is yet to be done.
4. Ferruling of cable termination points is not done.
5. Numbering of PTT station to be done with black colored paint.
6. Various card slots numbering in CCU unit is faulty.
7. CCU door earthing is to be done.
8. Illumination to be provided inside the CCU compartment.
9. Nomenclature of all the MCBs such as PS, Battery charger etc to be done.
10. Interfacing card nomenclature is to be done.
11. CCU field & card JB numbering is incorrect.
12. Terminals (4 nos.) nomenclature of each station are not available at both ends; i.e; CCU
side & instrument side.
13. Single phase Power supply to both the CCU units through battery bank is given from
RSP’s MLDB panel at both the areas. The said supply is to be changed/ connected to a
nearby Power Distribution Board as MLDB panel is prone to earth fault.
14. One MCB in between RSP’s power source and UPS to be connected which should be
adjacent the CCU unit at both the areas.
15. No goose mikes are connected to any desktop unit of PTT stations.
16. List showing supplied commissioning spares, laptops, software with required license,
operation & maintenance tools etc is to be submitted strictly as per contract which will be
handed over to purchaser after completion of commissioning.
17. All the as-built drawings, manufacturing datasheet for all the equipments of PTT system,
test certificates; software details, philosophy, catalogues & manuals are to be submitted.
18. Sheet showing item wise the list of two years maintenance spares along with their
pricing is to be submitted.
19. Canopy to be provided in all outdoor wall mounted PTT stations.
20. Certificate showing ingress protection standard IP65 as mentioned in the PTT catalogue
to be submitted for outdoor wall/ column mounted PTT stations. Ingress of dusts inside
the PTT stations has been observed at various locations which in turn shall short circuit
the circuit board.
21. As per page 28 of 38 of technical volume of contract; CCU to be equipped for minimum
64 subscriber stations, which is not available in both the areas i.e; CCM & BOF
22. All cables shall be laid in GI conduit for hot zones and in heavy duty PVC channel.
23. Group calling facility is to be incorporated as per requirement in the PTT system.
24. Auto calls transfer, transferring an ongoing call, leaving a call request, enquiry call &
time display features are to be shown.
25. The feature of auto diagnostic & fault indication are to be provided in the system to take
corrective action in case of fault.
26. Facility with required hardware/ software & cabling shall be provided for interfacing the
system with plant PBX system so that one-way announcement from the selected
telephone sets can be made to the external loudspeakers of all subscriber stations.
27. The CCU is to be powered from redundant UPS system with independent battery bank
as per page 8 of 38 of technical volume of contract.
28. All the basements and cable entry hole are to be sealed.
29. Earthing, ferruling, cable tagging, provision of canopy, nomenclature & TB numbering
are to be done for all SDFs, MDF, PJBs etc.
30. Laminated PTT station directory & operating instruction sheet are to be fixed on the wall
beside each station so as to make it convenient to make calls to desired stations.
Station wise Points:-

Sl. No. PTT Location of the Observation


Station Station
Number
CCM AREA
1 101 WTP-I Filter Feed Erroneous Display with unclear voice during talk
Pump
2 102 WTP-I Spray Pump OK
House
3 103 WTP1 Scale pit PH OK
4 104 WTP1 MCC Room Mute Button was not working
5 105 WTP2 Control Room OK
6 106 WTP2 PH Low & non audible sound from the speakers
during communication. Spurious display with non
functioning of pressed keys.
7 107 WTP2 PH PTT station Indication lights are faulty
8 108 WTP2 MCC Room Handset receiver support in damaged condition.
Both the speakers are noisy
9 109 RHOB PCC Room OK
10 110 RHOB MCC Room OK
11 111 RHOB Control Room Speaker noisy & disturbance in speech. Speaker
lower clamp not fixed.
12 112 Weight Hopper Area OK
13 113 RHOB VFD Room OK
14 114 Hot well PH Station is not working with no indication and
display.
15 115 New PC Room Low & unclear voice with intermittent audio during
communication with other stations.
16 116 Hydraulic Room Communicable audio was there from speakers,
but no communication during handset mode.
17 117 LHF 2B Control OK
Room
18 118 LHF 2C MCC Room Low sound from handset
19 119 LT Switchgear Room Horn loud speaker is not working.
20 120 FAFA Room OK
21 121 LHF 2A Control Voice is not clear with intermittent audio during
Room communication
22 122 LHF 2C Control OK
Room
23 123 LHF 2C Switchgear OK
Room
24 124 TTCM 4 Control Speakers are not functional with broken handset.
Room
25 125 TTCM 3&4 Hydraulic Display of the station is out of order.
Room
26 126 Pusher Piler The station is not working.
Hydraulic
27 127 Pulpit Cross Transfer The station is a desktop set whose connection is
Runout not done at the location and kept with M/s Byte
28 128 TTCM 3 Control OK
Room
29 129 The station is not installed at site.
30 130 Old Caster Cross OK
Transfer CR
31 131 Old Caster P3 The loud speaker and mute button are not
Operator working.
32 132 Old Caster Control The handset of the desktop station is in damaged
Room condition.
33 133 Old Caster 1&2 OK
Hydraulic Room
34 134 Caster 3 MCC Room OK
35 135 Caster 3 P3 Operator OK
Floor
36 136 Caster 3 PLC Control Door locking screw is missing.
Room
37 137 Caster 3 Hydraulic Hanging display with no communication from the
Room Mo Panel station.
38 138 Caster 3 Hydraulic Loud speakers and receiver are noisy at the time
Room of communication.
39 139 Caster 3 OS 5 OK
Monitor
40 140 Caster 3 WDR Noisy in both receiver and loud speaker mode is
observed.
41 141 Caster 3 Control The station is non functional with no sound from
Room handset and speakers.
42 142 Caster 3 Hydraulic Loud speaker’s position is to be changed to
Slide Gate opposite due to high plant noise.
43 143 Caster 3 E Room OK
TCM
44 144 Caster 3 TCM Pulpit The station is faulty with no communication.
45 145 LTSS 4 The set is faulty with no communication.
BOF AREA
1 201 BOF Lance 43 Mtr Display is faulty
Electrical Room
2 202 BOF Lance OK
Changing Area 41
Mtr Conv. 3
3 203 BOF Lance The station is faulty
Changing Area 41
Mtr. Conv. 1
4 204 BOF Lance The speaker of PTT unit is faulty with non
Changing Area 41 functioning of mute key.
Mtr. Conv. 2
5 205 BOF Lance Valve The instrument is fayulty.
Station Convertor 3
6 206 BOF Lance Valve Dialing pad and speakers are not working
Station 1+2 properly.
Convertor
7 207 BOF Lance 21 Mtr OK
Electrical Room
8 208 GCP dry Gas Horn speaker is not working with dust entering
Analyser Room 41 inside the unit.
Mtr
9 209 MMS Flux Handling The station is a desktop set whose connection is
53 Mtr MCC Room not done at the location and kept with M/s Byte
10 210 BOF Lance 41 Mtr OK
Electrical Room
11 211 Steel Car 2 Post 2 OK
12 212 BOF Gas Valve Both the speakers are not working.
Station Bottom
Stirring
13 213 Slag Pot 3 Post 2 OK
14 214 Slag Pot 1 Post 2 The station is not working.
15 215 GCP ID Fan The unit is faulty with no communication.
Switchgear Room
16 216 Steel Car 1 Post 2 The unit is faulty with no communication.
17 217 Extended Control OK
Room in Scrap Yard
18 218 Slag Pot 2 Post 2 OK
19 219 Old Scrap Yard OK
Control Room
20 220 Steel Car 3 Post 2 OK
21 221 GCP Wet Gas OK
Analyser Room
22 222 BOF Container Lab OK
23 223 BOF PLC Room OK
24 224 BOF Shift In Charge OK
Room
25 225 BOF Mechanical Loose cable connection with PJB not fixed to the
Room wall.
26 226 BOF New Control The desktop unit is faulty
Room
27 227 BOF Instrumentation OK
Room
28 228 BOF Electrical Room Horn Speaker of the unit is not working.
29 229 Old DS Control OK
Room
30 230 Mixer Control Room The instrument is faulty with no communication.
31 231 DS Rack Room Both the speakers are not working.
32 232 Old Torpedo Relining The speaker of the unit is in damaged condition.
Pit
33 233 New Torpedo
Speaker of the PTT unit is damaged; Display
Relining Pit glass is broken with non functioning of both the
speakers.
34 234 GRP MCC Room OK
35 235 GRP PLC Control OK
Room
36 236 R&C Room The system is noisy during communication.
37 237 WTP 3 PH 18 Speaker of PTT unit is not working.
38 238 WTP 3 CR (18-26 OK
Control Room)
39 239 WTP 3 DM Control OK
Room
40 240 BOF Old Control OK
Room
41 241 BOF Old Control OK
Room
42 242 BOF UPS Room OK
43 243 BOF Main Electrical OK
Room
44 244 EF Bay Changing Bothe speakers are not in working condition. Only
near Convertor 3 communication through handset is possible. Mal
functioning of display is observed.
45 245 EF Bay Changing The handset is faulty.
near Convertor 2
46 246 EF Bay Changing OK
near Convertor 1
47 247 De Slagging Pulpit The horn loud speaker is out of order.
Convertor 1
48 248 Tapping Pulpit The horn loud speaker is out of order.
Convertor 1
49 249 De Slagging Pulpit The PTT unit along with its horn speaker is not
Convertor 2 installed at the concerned location. Only cabling
done.
50 250 Tapping Pulpit The PTT unit along with its horn speaker is not
Convertor 2 installed at the concerned location. Only cabling
done.
51 251 De Slagging Pulpit OK
Convertor 3
52 252 Tapping Pulpit The horn loud speaker is out of order.
Convertor 3
53 253 Convertor 3 16 Mtr Communication sound is noisy and not clear.

(Byte) (Projects) (MECON) (SMS-II) (CED)