ABSTRACT OF COST
(Qty.as per Statement No.1 & Rate as per S.O.R 2013-14 of APWD (NH))
Item No. Item description Unit Qty. Rate (Rs.) Amount (Rs.)
1.00
Statement No-2
Quantity Statement for Repair of Br.No. 328/1
Br.No. : 328/1
NH No. : NH-715 (Old NH-37)
Name of Br. location : Bordolong
Type of Superstructure : Soild Slab without footpath
Span (exp. Jt. to exp. Jt) : 01 x 9.5 m
Overall width : 8.45m
Carriageway : 7.5m
Sl. No./SOR SA
Item description Unit Nos. L (m) B (m) H/t (m) Qty. Remark
Item ref. (sq.m)
1/16.1 Removal of existing cc wearing coat Sqm
2/16.2 Removal of asphaltic/mastic wearing coat Sqm 02 9.5 7.5 142.5 142.500 02 layers.
3/2.4(I).II.B Dismantling of RCC
4/16.24 Chipping & removal of deteriorated concrete SA= damaged concrete surface area
Super-structure Sqm 01 9.5 8.45 0.925 97.85 97.850 SA=9.5*(8.45+2*0.925)=97.850
Sub-structure- Abutment Sqm 02 8.45 3.5 17.745 17.745 SA=0.3*02*(8.45*3.5)=17.745
Sub-structure- Pier Sqm 0.000
Total Area= 115.595
5/16.4 Providing and inserting nipples each 29.000 57.7975 29.000 @ 01 Nipple per 02 sq.m of SA
6/16.7 Epoxy grouting kg 580.000 @ 20 Kg. per nipple
7/16.8 Epoxy mortar Sqm 115.595 115.595
8/16.26 (B) Primer coat on steel re-bars Sqm 115.595 1.156 @ 1% sq.m of SA
9/16.28(B) Polymer base bonding Sqm 115.595 115.595
10/16.31 Micro concrete cum --
11/16.33 (B) Fixing carbon fibre composite system sqm 01 9.5 8.45 0.65 92.625 92.625 A= 9.5 * (8.45+2*0.65)=92.625 sq.m
12/16.33 (A) Patching in concreate by epoxy putty sqm 92.625 for superstructure solid slab
13/16.33 (C) UV resistant coating 92.625
14/16.37 Anti-carbonation-a protective coating
Sub-structure-Abutment sqm 2 9.00 3.50 63.00 63.000 for substrcutre. L=8.1+2*0.45=9.0m
Sl. No./SOR SA
Item description Unit Nos. L (m) B (m) H/t (m) Qty. Remark
Item ref. (sq.m)
Sub-structure-Pier sqm
Total Area= 63.000
15/16.29 Plastering with polymer modified mortar sqm 4 10 2.75 110.0 110.000 for wing wall. H=(4.5+1)/2=2.75m
16/16.17 Replacement of expansion Joint meter
17/14.22 New Strip Seal Expansion Joint meter
18/ 14.18 (i) 2 mm thick corrugated copper plate meter 2 7.5 15.000 for expansion joint
19/ 14.18 (iii) 20 mm thick premoulded joint filler meter 2x2 8.1 32.400 for expansion joint l=4*8.1=32.4m
20/ 14.18 (iv) Joint sealing Compound meter 4 7.5 30.000 for expansion joint
21/17.64 Bituminous wearing coat Sqm 2 9.5 7.5 142.500 In 02 layers, Avg.69mm thk.
22/14.4 Cement concrete wearing coat M-30 grade cu.m
23/14.5 (A) Mastic Wearing Coat-12 mm Sqm
24/16.15 Labour for replacement of bearing each
25/16.16 Lifting of superstructure by jack each
26/13.14 New Elastomeric bearing ccm.
27/17.63 Greasing of Bearing each
28/14.9 Drainage spout each 02 x 05 10
29/Anna-01 Hanging Platform each 01 01
30/16.16 C(II) Extra for construction of auxilary structure
above 6M height each
115.595
28.89875 580 876380
0.01
92.625
45
Statement No-3
Quantity Statement for Repair of Br.No. 335/1
Br.No. : 335/1
NH No. : NH-715 (Old NH-37)
Name of Br. location : Gurakhati
Type of Superstructure : Soild Slab without footpath
Span (exp. Jt. to exp. Jt) : 02 x 8.875 m
Overall width : 8.45 m
Carriageway : 7.5 m
Sl. No./SOR SA
Item description Unit Nos. L (m) B (m) H/t (m) Qty. Remark
Item ref. (sq.m)
1/16.1 Removal of existing cc wearing coat Sqm
2/16.2 Removal of asphaltic/mastic wearing coat Sqm 04 8.875 7.5 266.25 266.250 02 layers
3/2.4(i).I.C Dismantling of RCC
4/16.24 Chipping & removal of deteriorated concrete SA= damaged concrete area
Super-structure Sqm 02 8.875 8.45 0.925 91.4125 91.413 SA=50%*02*8.875*(8.45+2*0.925)=91.413
Sub-structure-Abutment Sqm 02 8.45 3.75 31.6875 31.688 SA=50%*02*(8.45*3.75)=31.688
Sub-structure-Pier Sqm 01 9.5 1.25 3.75 40.3125 40.313 SA=50%*2*(9.5+1.25)*3.75=40.313 sq.m
Total Area= 163.413
5/16.4 Providing and inserting nipples each 41 81.7063 41.000 @ 01 Nipple per 02 sq.m of SA
6/16.7 Epoxy grouting kg 615.000 @ 15 Kg. per nipple
7/16.8 Epoxy mortar Sqm 163.413 163.413
8/16.26 (B) Primer coat on steel re-bars Sqm 163.413 1.634 @ 1% sq.m of SA
9/16.28(B) Polymer base bonding Sqm 163.413 163.413
10/16.31 Micro concrete cum --
11/16.33 (B) Fixing carbon fibre composite system sqm 02 8.875 8.45 0.65 173.063 173.063 A= 02*8.875* (8.45+2*0.65)=173.063 sq.m
12/16.33 (A) Patching in concreate by epoxy putty sqm 173.063 for superstructure solid slab
13/16.33 (C) UV resistant coating sqm 173.063
14/16.37 Anti-carbonation-protective coating
Sub-structure-Abutment sqm 2 9.00 3.75 67.5 67.500 for substrcutre. L=8.1+2*0.45=9.0m
Sub-structure-Pier sqm 1 9.5 1.25 3.75 80.625 80.625 A=2*(9.5+1.25)*3.75=80.625 sq.m
Total Area= 148.125
15/16.29 Plastering with polymer modified mortar sqm 4 10 2.75 110.0 110.000 for wing wall. H=(4.5+1)/2=2.75m
16/16.17 Replacement of expansion Joint meter
17/14.22 New Strip Seal Expansion Joint meter
18/ 14.18 (i) 2 mm thick corrugated copper plate meter 3 7.5 22.500 for expansion joint
19/ 14.18 (iii) 20 mm thick premoulded joint filler meter 3 x 2 8.1 48.600 for expansion joint l=6*8.1=48.6 m
20/ 14.18 (iv) Joint sealing Compound meter 6 7.5 45.000 for expansion joint
21/17.64 Bituminous wearing coat Sqm 4 8.875 7.5 266.250 In 02 layers, Avg.69mm thk.
22/14.4 Cement concrete wearing coat M-30 grade cu.m
23/14.5 (A) Mastic Wearing Coat-12 mm Sqm
24/16.15 Labour for replacement of bearing each
25/16.16 Lifting of superstructure by jack each
26/13.14 New Elastomeric bearing ccm.
27/17.63 Greasing of Bearing each
28/14.9 Drainage spout each 4 x 5 20
29/Anna-01 Hanging Platform each 01 01
30/16.16 C(II) Extra for construction of auxilary structure
above 6M height each
D kerb T
91.413 0.65 0.275 0.925
31.6875
40.313
123.1
40.85313 580 876380
0.01
173.0625
45
48.6
Statement No-4
Quantity Statement for Repair of Br.No. 336/1
Br.No. : 336/1
NH No. : NH-715 (Old NH-37)
Name of Br. location : Phullaguri Sang
Type of Superstructure : T-beam Slab
Span (exp. Jt. to exp. Jt) : 01 x15 m
Overall width : 8.5 m
Carriageway : 7.5 m
Sl. No./SOR SA
Item description Unit Nos. L (m) B (m) H/t (m) Qty. Remark
Item ref. (sq.m)
1/16.1 Removal of existing cc wearing coat Sqm 01 15.0 7.5 112.5 112.500
2/16.2 Removal of asphaltic/mastic wearing coat Sqm 01 15.0 7.5 112.5 112.500
3/2.4(i).I.C Dismantling of RCC cum 04 7.5 0.3 0.3 2.700 For repalcement of Exp. Joint
4/16.24 Chipping & removal of deteriorated concrete SA= damaged concrete surface area
T-beam Slab Area=232.17 sq.m
Super-structure Sqm 01 69.651 69.651
SA=30%* 232.17= 69.651 sq.m
Sub-structure- Abutment Sqm
Sub-structure- Pier Sqm
Total Area= 69.651
5/16.4 Providing and inserting nipples each 35.00 69.651 35.000 @ 01 Nipple per 02 sq.m of SA
6/16.7 Epoxy grouting kg 525.000 @ 15 Kg. per nipple
7/16.8 Epoxy mortar Sqm 69.651 69.651
8/16.26 (B) Primer coat on steel re-bars Sqm 69.651 0.697 @ 1% sq.m of SA
9/16.28(B) Polymer base bonding Sqm 69.651 69.651
Damaged Girder End over bearing
10/16.31 Micro concrete cum 7.088 = 03*2.5*0.45*1.3=4.3875 cu.m
for grouting Exp. Joint= 2.70 cu.m
L.Girder= 03*15*(2*1.5+0.3)=148.5
11/16.33 (B) Fixing carbon fibre composite system sqm 178.74 178.740 C.G = 03*02*(2*1.0*2.24+2.24*0.25)
=30.24 sq.m
12/16.33 (A) Patching in concreate by epoxy putty sqm 178.740
13/16.33 (C) UV resistant coating 178.740
14/16.37 Anti-carbonation-a protective coating
Superstrcuture slab soffit sqm 118.20 118.200 A= 02*(1.7+2.24)*15 =118.20 sq.m
Sub-structure-Abutment 87.15 87.150 A= 02*(8.45+2*2.0)*3.5 =87.15
Total Area= 205.350
15/16.29 Plastering with polymer modified mortar sqm
16/16.17 Replacement of expansion Joint meter 2 7.5 15.000
17/14.22 New Strip Seal Expansion Joint meter 2 7.5 15.000
18/ 14.18 (i) 2 mm thick corrugated copper plate meter
19/ 14.18 (iii) 20 mm thick premoulded joint filler meter
20/ 14.18 (iv) Joint sealing Compound meter
21/17.64 Bituminous wearing coat Sqm
22/14.4 Cement concrete wearing coat M-30 grade cu.m 1 15 7.5 0.075 8.438
23/14.5 (A) Mastic Wearing Coat-12 mm Sqm 1 15 7.5 112.5 112.500
24/16.15 Labour for replacement of bearing each 3 3.0
25/16.16 B.I) Lifting of superstructure by jack each 1 1.0
26/13.14 New Elastomeric bearing ccm. 6 129024 Qty=03*02*56*40*9.6=129024
27/17.63 Greasing of Bearing each
28/14.9 Drainage spout each 02 x 06 12
29/Anna-01 Hanging Platform each
30/16.16 C(II) Extra for construction of auxilary structure
above 6M height each 01 1.000
17.745
115.595
34.8255 580 876380
0.01
4.3875
129024
Statement No-5
Quantity Statement for Repair of Br.No. 339/1
Br.No. : 339/1
NH No. : NH-715 (Old NH-37)
Name of Br. location : Deosur
Type of Superstructure : RCC Box Girder without footpath
Span (exp. Jt. to exp. Jt) : 02 x 49.5
Overall width : 8.45 m
Carriageway : 7.5 m
Sl. No./SOR SA
Item description Unit Nos. L (m) B (m) H/t (m) Qty. Remark
Item ref. (sq.m)
1/16.1 Removal of existing cc wearing coat Sqm 01 99.0 7.5 742.5 742.500
2/16.2 Removal of asphaltic/mastic wearing coat Sqm 01 99.0 7.5 742.5 742.500 Top mastic layer
3/2.4(i).I.C Dismantling of RCC cum 06 7.5 0.3 0.25 3.375 For repalcement of Exp. Joint
4/16.24 Chipping & removal of deteriorated concrete SA= damaged concrete surface area
Br. Surface Area=1700.4 sq.m
Super-structure Sqm 255.06 255.060
Damaged surface @ 15%
Sub-structure- Abutment Sqm
Sub-structure- Pier Sqm
Total Area= 255.060
5/16.4 Providing and inserting nipples each 127.530 64.00 @ 01 Nipple per 02 sq.m of SA
6/16.7 Epoxy grouting kg 640.000 @ 10 Kg. per nipple
7/16.8 Epoxy mortar Sqm 255.060 255.060
8/16.26 (B) Primer coat on steel re-bars Sqm 255.060 2.551 @ 1% sq.m of SA
9/16.28(B) Polymer base bonding Sqm 255.060 255.060
10/16.31 Micro concrete cum 3.375 for grouting Exp. Joint= 3.375 cu.m
11/16.33 (B) Fixing carbon fibre composite system sqm
12/16.33 (A) Patching in concreate by epoxy putty sqm
13/16.33 (C) UV resistant coating
14/16.37 Anti-carbonation-a protective coating
Superstrcuture slab soffit sqm 1700.40 1700.400 Superst. Surface Area=1700.4 sq.m
Sub-structure-Abutment
Total Area= 1700.400
15/16.29 Plastering with polymer modified mortar sqm
16/16.17 Replacement of expansion Joint meter 3 7.5 22.500
17/14.22 New Strip Seal Expansion Joint meter 3 7.5 22.500
18/ 14.18 (i) 2 mm thick corrugated copper plate meter
19/ 14.18 (iii) 20 mm thick premoulded joint filler meter
20/ 14.18 (iv) Joint sealing Compound meter
21/17.64 Bituminous wearing coat Sqm
22/14.4 Cement concrete wearing coat M-30 grade cu.m 1 99 7.5 0.075 55.688
23/14.5 (A) Mastic Wearing Coat-12 mm Sqm 1 99 7.5 742.5 742.500
24/16.15 Labour for replacement of bearing each
25/16.16 B.I) Lifting of superstructure by jack each
26/13.14 New Elastomeric bearing ccm.
27/17.63 Greasing of Bearing each 08 8.0
28/14.9 Drainage spout each 32 32.0
29/Anna-01 Hanging Platform each 01 1.0
30/16.16 C(II) Extra for construction of auxilary structure
above 6M height each
Br.No. : 348/1
NH No. : NH-715 (Old NH-37)
Name of Br. location : Deopani
Type of Superstructure : RCC T-beam Girder Slabwithout footpath
Span (exp. Jt. to exp. Jt) : 01 X 45.1
Overall width : 8.5m
Carriageway : 7.5m
Sl. No./SOR SA
Item description Unit Nos. L (m) B (m) H/t (m) Qty. Remark
Item ref. (sq.m)
1/16.1 Removal of existing cc wearing coat Sqm 01 45.1 7.5 338.25 338.250
2/16.2 Removal of asphaltic/mastic wearing coat Sqm 01 45.1 7.5 338.25 338.250 Top mastic layer
3/2.4(i).I.C Dismantling of RCC cum 04 7.5 0.3 0.25 2.250 For repalcement of Exp. Joint
4/16.24 Chipping & removal of deteriorated concrete
Br. Surface Area=1855.655 sq.m
Super-structure Sqm 278.348 278.348
Damaged surface @ 15%
Sub-structure- Abutment Sqm
Sub-structure- Pier Sqm
Total Area= 278.348
5/16.4 Providing and inserting nipples each 92.783 46.000 @ 01 Nipple per 02 sq.m of SA
6/16.7 Epoxy grouting kg 552.000 @ 12 Kg. per nipple
7/16.8 Epoxy mortar Sqm 278.348
8/16.26 (B) Primer coat on steel re-bars Sqm 278.348 2.783 @ 1% sq.m of SA
9/16.28(B) Polymer base bonding Sqm 278.348 278.348
10/16.31 Micro concrete cum 2.250 for grouting Exp. Joint= 2.25 cu.m
11/16.33 (B) Fixing carbon fibre composite system sqm
12/16.33 (A) Patching in concreate by epoxy putty sqm
13/16.33 (C) UV resistant coating
14/16.37 Anti-carbonation-a protective coating
Superstrcuture slab soffit sqm 1855.66 1855.655 Superst. SA=1855.655 sq.m
Sub-structure-Abutment
Total Area= 1855.655
15/16.29 Plastering with polymer modified mortar sqm
16/16.17 Replacement of expansion Joint meter 2 7.5 15.000
17/14.22 New Strip Seal Expansion Joint meter 2 7.5 15.000
18/ 14.18 (i) 2 mm thick corrugated copper plate meter
19/ 14.18 (iii) 20 mm thick premoulded joint filler meter
20/ 14.18 (iv) Joint sealing Compound meter
21/17.64 Bituminous wearing coat Sqm
22/14.4 Cement concrete wearing coat M-30 grade cu.m 1 99 7.5 0.075 55.688
23/14.5 (A) Mastic Wearing Coat-12 mm Sqm 1 99 7.5 742.5 742.500
24/16.15 Labour for replacement of bearing each
25/16.16 B.I) Lifting of superstructure by jack each
26/13.14 New Elastomeric bearing ccm.
27/17.63 Greasing of Bearing each 06 6.0
28/14.9 Drainage spout each 6 6.0
29/Anna-01 Hanging Platform each 01 1.0
30/16.16 C(II) Extra for construction of auxilary structure
above 6M height each
Br.No. : 352/1
NH No. : NH-715 (Old NH-37)
Name of Br. location : Kuthari
Type of Superstructure : R.C.C Soild Slab without footpath
Span (exp. Jt. to exp. Jt) : 02 x 7.25 m
Overall width : 8.25 m
Carriageway : 7.3 m
Sl. No./SOR SA
Item description Unit Nos. L (m) B (m) H/t (m) Qty. Remark
Item ref. (sq.m)
1/16.1 Removal of existing cc wearing coat Sqm
2/16.2 Removal of asphaltic/mastic wearing coat Sqm 04 7.25 7.3 211.7 211.700 02 layers
3/2.4(i).I.C Dismantling of RCC
4/16.24 Chipping & removal of deteriorated concrete SA= damaged concrete area
Super-structure Sqm 02 7.25 8.25 0.925 87.87 87.870 SA=60%*02*7.25*(8.25+2*0.925)=87.87
Sub-structure-Abutment Sqm 02 9.1 3.75 34.125 34.125 SA=50%*02*(9.1*3.75)=34.125
Sub-structure-Pier Sqm 01 9.5 1.25 3.75 48.375 48.375 SA=60%*2*(9.5+1.25)*3.75=48.375 sq.m
Total Area= 170.370
5/16.4 Providing and inserting nipples each 41 85.185 41.000 @ 01 Nipple per 02 sq.m of SA
6/16.7 Epoxy grouting kg 615.000 @ 15 Kg. per nipple
7/16.8 Epoxy mortar Sqm 170.370 170.370
8/16.26 (B) Primer coat on steel re-bars Sqm 170.370 1.704 @ 1% sq.m of SA
9/16.28(B) Polymer base bonding Sqm 170.370 170.370
10/16.31 Micro concrete cum --
11/16.33 (B) Fixing carbon fibre composite system sqm 02 7.25 8.25 0.65 138.475 138.475 A= 02*7.25* (8.25+2*0.65)=138.475 sq.m
12/16.33 (A) Patching in concreate by epoxy putty sqm 138.475 for superstructure solid slab
13/16.33 (C) UV resistant coating sqm 138.475
14/16.37 Anti-carbonation-protective coating
Sub-structure-Abutment sqm 2 9.10 3.75 68.25 68.250 for substrcutre. L=8.1+2*0.5=9.1m
Sub-structure-Pier sqm 1 9.5 1.25 3.75 80.625 80.625 A=2*(9.5+1.25)*3.75=80.625 sq.m
Total Area= 148.875
15/16.29 Plastering with polymer modified mortar sqm 4 10 2.75 110.0 110.000 for wing wall. H=(4.5+1)/2=2.75m
16/16.17 Replacement of expansion Joint meter
17/14.22 New Strip Seal Expansion Joint meter
18/ 14.18 (i) 2 mm thick corrugated copper plate meter 3 7.3 21.900 for expansion joint
19/ 14.18 (iii) 20 mm thick premoulded joint filler meter 3 x 2 8.1 48.600 for expansion joint l=6*8.1=48.6 m
20/ 14.18 (iv) Joint sealing Compound meter 6 7.3 43.800 for expansion joint
21/17.64 Bituminous wearing coat Sqm 4 7.25 7.3 211.700 In 02 layers, Avg.69mm thk.
22/14.4 Cement concrete wearing coat M-30 grade cu.m
23/14.5 (A) Mastic Wearing Coat-12 mm Sqm
24/16.15 Labour for replacement of bearing each
25/16.16 Lifting of superstructure by jack each
26/13.14 New Elastomeric bearing ccm.
27/17.63 Greasing of Bearing each
28/14.9 Drainage spout each 2 x 4 08
29/Anna-01 Hanging Platform each 01 01
30/16.16 C(II) Extra for construction of auxilary structure
above 6M height each
0.01
138.475
45
48.6
Statement No-8
Quantity Statement for Repair of Br.No. 352/2
Br.No. : 352/2
NH No. : NH-715 (Old NH-37)
Name of Br. location : Harmoti
Type of Superstructure : R.C.C Soild Slab without footpath
Span (exp. Jt. to exp. Jt) : 02 x 7.25 m
Overall width : 8.25 m
Carriageway : 7.3 m
Sl. No./SOR SA
Item description Unit Nos. L (m) B (m) H/t (m) Qty. Remark
Item ref. (sq.m)
1/16.1 Removal of existing cc wearing coat Sqm
2/16.2 Removal of asphaltic/mastic wearing coat Sqm 04 7.25 7.3 211.7 211.700 02 layers
3/2.4(i).I.C Dismantling of RCC
4/16.24 Chipping & removal of deteriorated concrete SA= damaged concrete area
Super-structure Sqm 02 7.25 8.25 0.925 87.87 87.870 SA=60%*02*7.25*(8.25+2*0.925)=87.87
Sub-structure-Abutment Sqm 02 9.1 3.5 31.85 31.850 SA=50%*02*(9.1*3.5)=31.85
Sub-structure-Pier Sqm 01 9.5 1.25 3.5 45.15 45.150 SA=60%*2*(9.5+1.25)*3.5=45.150 sq.m
Total Area= 164.870
5/16.4 Providing and inserting nipples each 41 82.435 41.000 @ 01 Nipple per 02 sq.m of SA
6/16.7 Epoxy grouting kg 615.000 @ 15 Kg. per nipple
7/16.8 Epoxy mortar Sqm 164.870 164.870
8/16.26 (B) Primer coat on steel re-bars Sqm 164.870 1.649 @ 1% sq.m of SA
9/16.28(B) Polymer base bonding Sqm 164.870 164.870
10/16.31 Micro concrete cum --
11/16.33 (B) Fixing carbon fibre composite system sqm 02 7.25 8.25 0.65 138.475 138.475 A= 02*7.25* (8.25+2*0.65)=138.475 sq.m
12/16.33 (A) Patching in concreate by epoxy putty sqm 138.475 for superstructure solid slab
13/16.33 (C) UV resistant coating sqm 138.475
14/16.37 Anti-carbonation-protective coating
Sub-structure-Abutment sqm 2 9.10 3.50 63.7 63.700 for substrcutre. L=8.1+2*0.5=9.1m
Sub-structure-Pier sqm 1 9.5 1.25 3.50 75.25 75.250 A=2*(9.5+1.25)*3.5=75.25 sq.m
Total Area= 138.950
15/16.29 Plastering with polymer modified mortar sqm 4 10 2.75 110.0 110.000 for wing wall. H=(4.5+1)/2=2.75m
16/16.17 Replacement of expansion Joint meter
17/14.22 New Strip Seal Expansion Joint meter
18/ 14.18 (i) 2 mm thick corrugated copper plate meter 3 7.3 21.900 for expansion joint
19/ 14.18 (iii) 20 mm thick premoulded joint filler meter 3 x 2 8.1 48.600 for expansion joint l=6*8.1=48.6 m
20/ 14.18 (iv) Joint sealing Compound meter 6 7.3 43.800 for expansion joint
21/17.64 Bituminous wearing coat Sqm 4 7.25 7.3 211.700 In 02 layers, Avg.69mm thk.
22/14.4 Cement concrete wearing coat M-30 grade cu.m
23/14.5 (A) Mastic Wearing Coat-12 mm Sqm
24/16.15 Labour for replacement of bearing each
25/16.16 Lifting of superstructure by jack each
26/13.14 New Elastomeric bearing ccm.
27/17.63 Greasing of Bearing each
28/14.9 Drainage spout each 2 x 4 08
29/Anna-01 Hanging Platform each 01 01
30/16.16 C(II) Extra for construction of auxilary structure
above 6M height each
0.01
138.475
45
48.6
Statement No-9
Quantity Statement for Repair of Br.No. 353/1
Br.No. : 353/1
NH No. : NH-715 (Old NH-37)
Name of Br. location : Harmoti
Type of Superstructure : R.C.C Soild Slab without footpath
Span (exp. Jt. to exp. Jt) : 01 x 9 m
Overall width : 8.45 m
Carriageway : 7.5 m
Sl. No./SOR SA
Item description Unit Nos. L (m) B (m) H/t (m) Qty. Remark
Item ref. (sq.m)
1/16.1 Removal of existing cc wearing coat Sqm
2/16.2 Removal of asphaltic/mastic wearing coat Sqm 02 9 7.5 135 135.000 02 layers.
3/2.4(I).II.B Dismantling of RCC
4/16.24 Chipping & removal of deteriorated concrete SA= damaged concrete surface area
Super-structure Sqm 01 9.00 8.45 0.925 92.7 92.700 SA=9.0*(8.45+2*0.925)=92.70
Sub-structure- Abutment Sqm 02 8.45 3.5 17.745 17.745 SA=0.3*02*(8.45*3.5)=17.745
Sub-structure- Pier Sqm 0.000
Total Area= 110.445
5/16.4 Providing and inserting nipples each 28.000 55.2225 28.000 @ 01 Nipple per 02 sq.m of SA
6/16.7 Epoxy grouting kg 560.000 @ 20 Kg. per nipple
7/16.8 Epoxy mortar Sqm 110.445 110.445
8/16.26 (B) Primer coat on steel re-bars Sqm 110.445 1.104 @ 1% sq.m of SA
9/16.28(B) Polymer base bonding Sqm 110.445 110.445
10/16.31 Micro concrete cum --
11/16.33 (B) Fixing carbon fibre composite system sqm 01 9 8.45 0.65 87.75 87.750 A= 9.0 * (8.45+2*0.65)=87.75 sq.m
12/16.33 (A) Patching in concreate by epoxy putty sqm 87.750 for superstructure solid slab
13/16.33 (C) UV resistant coating 87.750
14/16.37 Anti-carbonation-a protective coating
Sub-structure-Abutment sqm 2 9.00 3.50 63.00 63.000 for substrcutre. L=8.1+2*0.45=9.0m
Sub-structure-Pier sqm
Total Area= 63.000
15/16.29 Plastering with polymer modified mortar sqm 4 10 2.75 110.0 110.000 for wing wall. H=(4.5+1)/2=2.75m
16/16.17 Replacement of expansion Joint meter
17/14.22 New Strip Seal Expansion Joint meter
18/ 14.18 (i) 2 mm thick corrugated copper plate meter 2 7.5 15.000 for expansion joint
19/ 14.18 (iii) 20 mm thick premoulded joint filler meter 2x2 8.1 32.400 for expansion joint l=4*8.1=32.4m
20/ 14.18 (iv) Joint sealing Compound meter 4 7.5 30.000 for expansion joint
21/17.64 Bituminous wearing coat Sqm 2 9 7.5 135.000 In 02 layers, Avg.69mm thk.
22/14.4 Cement concrete wearing coat M-30 grade cu.m
23/14.5 (A) Mastic Wearing Coat-12 mm Sqm
24/16.15 Labour for replacement of bearing each
25/16.16 Lifting of superstructure by jack each
26/13.14 New Elastomeric bearing ccm.
27/17.63 Greasing of Bearing each
28/14.9 Drainage spout each 02 x 03 06
29/Anna-01 Hanging Platform each 01 01
30/16.16 C(II) Extra for construction of auxilary structure
above 6M height each
110.445
27.61125 580 876380
0.01
87.75
45
Statement No-10
Quantity Statement for Repair of Br.No. 355/1
Br.No. : 355/1
NH No. : NH-715 (Old NH-37)
Name of Br. location : Harmoti
Type of Superstructure : R.C.C Soild Slab without footpath
Span (exp. Jt. to exp. Jt) : 02 x 7.4 m
Overall width : 8.25 m
Carriageway : 7.3 m
Sl. No./SOR SA
Item description Unit Nos. L (m) B (m) H/t (m) Qty. Remark
Item ref. (sq.m)
1/16.1 Removal of existing cc wearing coat Sqm
2/16.2 Removal of asphaltic/mastic wearing coat Sqm 04 7.4 7.3 216.08 216.080 02 layers
3/2.4(i).I.C Dismantling of RCC
4/16.24 Chipping & removal of deteriorated concrete SA= damaged concrete area
Super-structure Sqm 02 7.4 8.25 0.925 59.792 59.792 SA=40%*02*7.4*(8.25+2*0.925)=59.72
Sub-structure-Abutment Sqm 02 9.1 3.5 19.11 19.110 SA=30%*02*(9.1*3.5)=19.11
Sub-structure-Pier Sqm 01 9.5 1.25 3.5 22.575 22.575 SA=30%*2*(9.5+1.25)*3.5=22.575 sq.m
Total Area= 101.477
5/16.4 Providing and inserting nipples each 41 50.7385 25.000 @ 01 Nipple per 02 sq.m of SA
6/16.7 Epoxy grouting kg 375.000 @ 15 Kg. per nipple
7/16.8 Epoxy mortar Sqm 101.477 101.477
8/16.26 (B) Primer coat on steel re-bars Sqm 101.477 1.015 @ 1% sq.m of SA
9/16.28(B) Polymer base bonding Sqm 101.477 101.477
10/16.31 Micro concrete cum --
11/16.33 (B) Fixing carbon fibre composite system sqm 02 7.4 8.25 0.65 141.34 141.340 A= 02*7.4* (8.25+2*0.65)=141.34 sq.m
12/16.33 (A) Patching in concreate by epoxy putty sqm 141.340 for superstructure solid slab
13/16.33 (C) UV resistant coating sqm 141.340
14/16.37 Anti-carbonation-protective coating
Sub-structure-Abutment sqm 2 9.10 3.50 63.7 63.700 for substrcutre. L=8.1+2*0.5=9.1m
Sub-structure-Pier sqm 1 9.5 1.25 3.50 75.25 75.250 A=2*(9.5+1.25)*3.5=75.25 sq.m
Total Area= 138.950
15/16.29 Plastering with polymer modified mortar sqm 4 10 2.75 110.0 110.000 for wing wall. H=(4.5+1)/2=2.75m
16/16.17 Replacement of expansion Joint meter
17/14.22 New Strip Seal Expansion Joint meter
18/ 14.18 (i) 2 mm thick corrugated copper plate meter 3 7.3 21.900 for expansion joint
19/ 14.18 (iii) 20 mm thick premoulded joint filler meter 3 x 2 8.1 48.600 for expansion joint l=6*8.1=48.6 m
20/ 14.18 (iv) Joint sealing Compound meter 6 7.3 43.800 for expansion joint
21/17.64 Bituminous wearing coat Sqm 4 7.4 7.3 216.080 In 02 layers, Avg.69mm thk.
22/14.4 Cement concrete wearing coat M-30 grade cu.m
23/14.5 (A) Mastic Wearing Coat-12 mm Sqm
24/16.15 Labour for replacement of bearing each
25/16.16 Lifting of superstructure by jack each
26/13.14 New Elastomeric bearing ccm.
27/17.63 Greasing of Bearing each
28/14.9 Drainage spout each 2 x 4 08
29/Anna-01 Hanging Platform each 01 01
30/16.16 C(II) Extra for construction of auxilary structure
above 6M height each
0.01
141.34
45
48.6
Statement No-11
Quantity Statement for Repair of Br.No. 357/1
Br.No. : 357/1
NH No. : NH-715 (Old NH-37)
Name of Br. location : Bagori
Type of Superstructure : Soild Slab without footpath
Span (exp. Jt. to exp. Jt) : 01 x 9.2 m
Overall width : 8.45 m
Carriageway : 7.5 m
Sl. No./SOR SA
Item description Unit Nos. L (m) B (m) H/t (m) Qty. Remark
Item ref. (sq.m)
1/16.1 Removal of existing cc wearing coat Sqm
2/16.2 Removal of asphaltic/mastic wearing coat Sqm 02 9.2 7.5 138 138.000 02 layers.
3/2.4(I).II.B Dismantling of RCC
4/16.24 Chipping & removal of deteriorated concrete SA= damaged concrete surface area
Super-structure Sqm 01 9.2 8.45 0.925 97.85 97.850 SA=9.5*(8.45+2*0.925)=97.850
Sub-structure- Abutment Sqm 02 8.45 3.5 17.745 17.745 SA=0.3*02*(8.45*3.5)=17.745
Sub-structure- Pier Sqm 0.000
Total Area= 115.595
5/16.4 Providing and inserting nipples each 29.000 57.7975 29.000 @ 01 Nipple per 02 sq.m of SA
6/16.7 Epoxy grouting kg 435.000 @ 15 Kg. per nipple
7/16.8 Epoxy mortar Sqm 115.595 115.595
8/16.26 (B) Primer coat on steel re-bars Sqm 115.595 1.156 @ 1% sq.m of SA
9/16.28(B) Polymer base bonding Sqm 115.595 115.595
10/16.31 Micro concrete cum --
11/16.33 (B) Fixing carbon fibre composite system sqm 01 9.2 8.45 0.65 89.7 89.700 A= 9.5 * (8.45+2*0.65)=92.625 sq.m
12/16.33 (A) Patching in concreate by epoxy putty sqm 89.700 for superstructure solid slab
13/16.33 (C) UV resistant coating 89.700
14/16.37 Anti-carbonation-a protective coating
Sub-structure-Abutment sqm 2 9.00 3.50 63.00 63.000 for substrcutre. L=8.1+2*0.45=9.0m
Sub-structure-Pier sqm
Total Area= 63.000
15/16.29 Plastering with polymer modified mortar sqm 4 10 2.75 110.0 110.000 for wing wall. H=(4.5+1)/2=2.75m
16/16.17 Replacement of expansion Joint meter
17/14.22 New Strip Seal Expansion Joint meter
18/ 14.18 (i) 2 mm thick corrugated copper plate meter 2 7.5 15.000 for expansion joint
19/ 14.18 (iii) 20 mm thick premoulded joint filler meter 2x2 8.1 32.400 for expansion joint l=4*8.1=32.4m
20/ 14.18 (iv) Joint sealing Compound meter 4 7.5 30.000 for expansion joint
21/17.64 Bituminous wearing coat Sqm 2 9.2 7.5 138.000 In 02 layers, Avg.69mm thk.
22/14.4 Cement concrete wearing coat M-30 grade cu.m
23/14.5 (A) Mastic Wearing Coat-12 mm Sqm
24/16.15 Labour for replacement of bearing each
25/16.16 Lifting of superstructure by jack each
26/13.14 New Elastomeric bearing ccm.
27/17.63 Greasing of Bearing each
28/14.9 Drainage spout each 02 x 03 06
29/Anna-01 Hanging Platform each 01 01
30/16.16 C(II) Extra for construction of auxilary structure
above 6M height each
115.595
28.89875 580 876380
0.01
92.625
45
BRIDGE DISTRESS PHOTHOGRAPH
BR. No-328/1
BR. No-335/1
BR. No-336/1
BR. No-339/1
BR. No-348/1
BR. No-352/1
BR. No-353/1
BR. No-355/1
BR. No-357/1
Annalysis of Hanging Platform for repair & painting of Bridges
Total
Sl.No Item No Particulars/ Description of Items Unit Rate (Rs)
Quantity
Providing and launching steel struss of structural steel BUG super structure including painting complete
as per section 1900 of MoRTH specification.
14.14 Quantity Calculation
SOR for ISMB250 4x5.0x37.3 = 746 kg
1 mt 0.969 158977.00
SH, MDR ISMB150 5x3.0x14.9 = 223.5 kg
2018-19 ----------------------------------------------
= 969.5 kg
Supplying, fitting and fixing Azar, Nahar or Nageswar woodwork complete, including fixing with MS
Boards, nuts , nails, screws etc. and coal taring two coats with best tar applied hot as per approved
drawings and technical specifications, complete as per direction of Engineer in charge. (a ) In Undressed
woodwork in floor planks, collars, bracing, wheel guards,struts,runner belts,railings,. Railposts, runners
etc....
2 17.7/a Quantity Calculation cum 3.910 26269.00
Runner 4x5.0x0.10x0.10 = 0.2 cum
Decking 55x3.0x0.15x.15 = 3.71 cum
------------------------------------------------------
= 3.91 cum
of Bridges
Amount (Rs.)
154048.71
102711.79
256760.50
256,760.00
Br.No. : 357/1
NH No. : NH-715 (Old NH-37)
Name of Br. location : Harmoti
Type of Superstructure : R.C.C Soild Slab
Span (exp. Jt. to exp. Jt) : 01 x 9.2 m
Overall width : 8.5 m
Carriageway : 7.5 m
Quantity
wing/
Item No. Item description Unit Existing
Super- Substrcu return/ Bearig Exp. Wearing Drainage
wearing others Total
structure tre screen Pedastal Joint Coat spout
coat
wall
50
10kg/nipple
40%
1%
30%
89.24
Statement No-10
Quantity Statement for Repair of Br.No. 355/1
Br.No. : 355/1
NH No. : NH-715 (Old NH-37)
Name of Br. location : Harmoti
Type of Superstructure : R.C.C Soild Slab
Span (exp. Jt. to exp. Jt) : (01x7.6)+(01 x 7.4) m
Overall width : 8.5m
Carriageway : 7.5m
Quantity
wing/
Item No. Item description Unit Existing
Super- Substrcu return/ Bearig Exp. Wearing Drainage
wearing others Total
structure tre screen Pedastal Joint Coat spout
coat
wall
50
10kg/nipple
40%
1%
30%
60
Statement No-9
Quantity Statement for Repair of Br.No. 353/1
Br.No. : 353/1
NH No. : NH-715 (Old NH-37)
Name of Br. location : Harmoti
Type of Superstructure : R.C.C Soild Slab
Span (exp. Jt. to exp. Jt) : 01 x 9 m
Overall width : 8.5m
Carriageway : 7.5m
Quantity
wing/
Item No. Item description Unit Existing
Super- Substrcu return/ Bearig Exp. Wearing Drainage
wearing others Total
structure tre screen Pedastal Joint Coat spout
coat
wall
50
10kg/nipple
40%
1%
30%
87.3
Statement No-8
Quantity Statement for Repair of Br.No. 352/2
Br.No. : 352/2
NH No. : NH-715 (Old NH-37)
Name of Br. location : Kuthari
Type of Superstructure : R.C.C Soild Slab
Span (exp. Jt. to exp. Jt) : 02 x 7.3 m
Overall width : 8.5m
Carriageway : 7.5m
Quantity
wing/
Item No. Item description Unit Existing
Super- Substrcu return/ Bearig Exp. Wearing Drainage
wearing others Total
structure tre screen Pedastal Joint Coat spout
coat
wall
50
10kg/nipple
40%
1%
30%
141.62
Statement No-7
Quantity Statement for Repair of Br.No. 352/1
Br.No. : 352/1
NH No. : NH-715 (Old NH-37)
Name of Br. location : Kuthari
Type of Superstructure : R.C.C Soild Slab
Span (exp. Jt. to exp. Jt) : 02 x 7.3 m
Overall width : 8.5m
Carriageway : 7.5m
Quantity
wing/
Item No. Item description Unit Existing
Super- Substrcu return/ Bearig Exp. Wearing Drainage
wearing others Total
structure tre screen Pedastal Joint Coat spout
coat
wall
50
10kg/nipple
40%
1%
30%
141.62
Statement No-2
Quantity Statement for Repair of Br.No. 328/1
Br.No. : 328/1
NH No. : NH-715 (Old NH-37)
Name of Br. location : Bordolong
Type of Superstructure : Soild Slab
Span (exp. Jt. to exp. Jt) : 01 x 9.5 m
Overall width : 8.5m
Carriageway : 7.5m
Quantity
wing/
Item No. Item description Unit Existing
Super- Substrcu return/ Bearig Exp. Wearing Drainage
wearing others Total
structure tre screen Pedastal Joint Coat spout
coat
wall
50 74575
10kg/nipple 815940
30% 5.75 890515
1%
30%
92.15
Statement No-3
Quantity Statement for Repair of Br.No. 335/1
Br.No. : 335/1
NH No. : NH-715 (Old NH-37)
Name of Br. location : Gurakhati
Type of Superstructure : Soild Slab
Span (exp. Jt. to exp. Jt) : 02 x 8.875 m
Overall width : 8.5m
Carriageway : 7.5m
Quantity
wing/
Item No. Item description Unit Existing
Super- Substrcu return/ Bearig Exp. Wearing Drainage
wearing others Total
structure tre screen Pedastal Joint Coat spout
coat
wall
50
10kg/nipple
30%
1%
30%
172.175
Statement No-5
Quantity Statement for Repair of Br.No. 339/1
Br.No. : 339/1
NH No. : NH-715 (Old NH-37)
Name of Br. location : Deosur
Type of Superstructure : RCC Box Girder
Span (exp. Jt. to exp. Jt) : 02 x49.5
Overall width : 8.5m
Carriageway : 7.5m
Quantity
wing/
Item No. Item description Unit Existing
Super- Substrcu return/ Bearig Exp. Wearing Drainage
wearing others Total
structure tre screen Pedastal Joint Coat spout
coat
wall
50
Statement No-4
Quantity Statement for Repair of Br.No. 336/1
Br.No. : 336/1
NH No. : NH-715 (Old NH-37)
Name of Br. location : Fullaguri Sang
Type of Superstructure : Soild Slab
Span (exp. Jt. to exp. Jt) : 01 x15
Overall width : 8.5m
Carriageway : 7.5m
Quantity
wing/
Item No. Item description Unit Existing
Super- Substrcu return/ Bearig Exp. Wearing Drainage
wearing others Total
structure tre screen Pedastal Joint Coat spout
coat
wall
50
8.5
145.5
Statement No-6
Quantity Statement for Repair of Br.No. 348/1
Br.No. : 348/1
NH No. : NH-715 (Old NH-37)
Name of Br. location : Deopani
Type of Superstructure : RCC T-beam Girder Slab
Span (exp. Jt. to exp. Jt) : 01 X 45.1
Overall width : 8.5m
Carriageway : 7.5m
Quantity
wing/
Item No. Item description Unit Existing
Super- Substrcu return/ Bearig Exp. Wearing Drainage
wearing others Total
structure tre screen Pedastal Joint Coat spout
coat
wall
50
22.55
STATEMENT-L
RETAINING WALL AT CH.337/200 AT L/S OF NH-715
1.5 m x 1.0 m
Weep Hole
2.0 m x 1.0 m
2.5 m x 1.5 m
1.5 m 1.0 m
N.G.L
Quantity Statement
Qty.
Sl. No. Items Unit L (m) B (m) H (m) (cu.m)
1) PCC 1:3:6 in foundation cu.m 12.00 3.00 0.10 3.60
2) Boulder Apron in Wire Crates cu.m
1st. Layer cu.m 12.00 2.50 1.25 37.50
2nd. Layer cu.m 12.00 2.50 1.50 45.00
3rd. Layer cu.m 12.00 2.00 1.00 24.00
4th. Layer cu.m 12.00 1.50 1.00 18.00
5th. Layer cu.m 12.00 1.00 1.00 12.00
Total= cu.m 136.50
3) PCC Grade M15 in head wall cu.m 12.00 0.60 0.75 5.40
4) Plaster in head wall sq.m 12.00 2.1 25.2
5) Painting in head wall sq.m 12.00 2.1 25.2
6) Weep Hole each 20
Rate
Item No. Item description Unit Qty. Amount (Rs.)
(Rs.)
1/12.1/304
Excavation for Structures (Earth work in
excavation of foundation of structures as
per drawing and technical specification,
including setting out, construction of
shoring and bracing, removal of stumps
and other deleterious matter, dressing of
sides and bottom and backfilling with
approved material.
A. Manual Means
(I) Without dewatering
(i) upto 3 m depth cum 48.6 65.00 3,159.00
2/12.4/2100 PCC 1:3:6 in Foundation (Plain cement
concrete 1:3:6 nominal mix in foundation
with crushed stone aggregate 40 mm
nominal size mechanically mixed, placed cum 3.60 4964.00 17,870.40
in foundation and compacted by vibration
including curing for 14 days.)
16.26 (B) Supplying and applying two coats of Nitozinc Sqm 183 220
Primer a two component epoxy zinc rich
primer on the properly cleaned and prepared
steel bars after the required chipping and
cleaning of the concrete surface as per the
manufactures specification as directed and
specified by the department complete
16.31 Concreting of the structure with free flow cum 104861 104861
nonshrink cementitious micro concrete with
renderoc RG of fosroc or equivalent after
proper mixing with clean water including
formwork followed by proper curing for 28
days as per manufacture's specification
complete and as directed by the Department
16.33 A. Patching in depression of concreate surface sqm 1751 1751
wherever necessary by laying epoxy putty ,
nitocote VF of fosroc Chemicals or
equivalent@1 lit per sqm after proper surface
preparation and proper scraping of concreate
protrusion as specified and directed by the
department complete including formwork
1000 kg
cement/20m span
Aprox 0.5kg/ Sqm of
the Bridge area
20 % of the bridge
surface area
20 % of the bridge
surface area
As per actual
mesurement