You are on page 1of 2

November 18, 2019

Mr. Daryl Bonbon


VECO Service Center
B1 One Pavilion Mall, Banawa
Cebu City, 6000 Cebu

To whom it may concern;

Greetings of peace and prosperity!


This is from Seed Design and Planning Studio. We have already reached you regarding our request to
relocate an electrical post within the lot property of Aznar Basque Properties Inc. Upon our site clearing,
we have noticed that there are tension rods / cables that are within the site and are connected to a post
across the site.

The said cables will be affected by the ongoing construction since we need to fully clear the site where
the building is to be constructed. We are hoping that you may enlighten us on the possible action needed
regarding this since the construction is underway.

With this, we are asking for your prompt response regarding the matter. If you have any clarifications,
please do not hesitate to contact us.

Sincerely,

Seed Design and Planning Studio


Commercial Unit, Vertu Residences, Salinas Drive Extension
Lahug, Cebu City, Cebu
09266753243/ (032) 511 – 0376
inquiry.seed.designlab@gmail.com
Actual Photos of Existing Post and Cables

You might also like