Condemnation of wagons:
a) Sanction challan of condemn wagon awaiting for auction sale. BOXN -01
b) Proposed condemn wagon/ Coach awaiting for CRSE/GRC Sanction: BOST-1, BRN-2, BVZC-1, BOXN-
42
ART:
Inspection of officer /supervisor level conducted as per scheduled.
Last ART Movement: 20/10/18 at D-Cabin/BKSC & MHQ for derailment.
Stainless steel cutting equipment (HRD) is available.
ARME:
Last ARME Movement: 07/09/18 for Mock Drill at BJE
140T B.D.Crane/BKSC
New AMC of main engine is terminated from 12/10/18 by Higher Authority due to not submission of PG bond
timely. New AMC under process at divisional level.
Auxiliary engine AMC valid up to 13/06/20
SLI System under AMC valid up to 29/11/19
Last utilization of crane on 28/11/19 for lunching new FOB at Jhantipahari(JPH)
ASSISTANCE REQUIRED:
ACHIEVEMENTS
1. Surprise night/day inspection of outgoing rakes are conducted by Sr. Supervisors, ADME /
BKSC.
2. 100% Bk.Vans are checked at inward /BKSC.
3. Multy-utility CBC gauge is used during examination.
4. Welding repairs are increased at Yard by portable welding plant in Line No. 6,7,8,9 &14 at
Outward Yard.
5. One spring height measuring gadget is designed and developed at Sick Line/BKSC.
6. CTRB checking work is going on at Inward Yd/BKSC
7. Rolling in Examination is continuing and Axle Box temperature records are maintaining at
Inward Yard/BKSC
Sick Line
ADME(C&W)/BKSC