Professional Documents
Culture Documents
Client’s Name:
Pre-Construction Stage
1.
2.
3.
4.
1
SEDA/TEMPLATE/002
[ SP to Insert Company Letter Head Here]
Construction Stage
Equipment Details
Type/ Unit Price Sub-Total Price
Equipment Capacity/Size No. of unit
Brand/Model (RM) (RM)
PV Module
Inverter
PV Mounting Structure/Roof
Structure
Floatation System (if
applicable)
Energy Meter
Electrical Protection System
(please specify)
Balance of System (Others-
please specify)
TOTAL Price (B)
2
SEDA/TEMPLATE/002
[ SP to Insert Company Letter Head Here]
Prepared by:
________________________
Name:
Position:
Date:
Accepted by:
________________________
Name:
Position:
Date: