You are on page 1of 33

STEAM STERILIZER

MODEL NO: VSC-220L

Operating & Service Manual

This product is medical equipment.

Ask the person in charge of operation, repair, and control.


The users must read this manual before use. After reading it,
keep this manual next to the equipment for easy use.

After sales service inquiry: TEL: 82-31-459-7152

E-mail: personmedi@personmedi.co.kr

PERSON MEDICAL Co., Ltd.

OPERATING MANUAL VSC-220L


1
Symbols in this manual and explanation of caution indication

Warning: Warning signs warn users of the possibility of personal injury


and/or equipment damage.

Caution: Caution signs warn users of the possibility of equipment breakdown.

Note: Note signs give users the information about the pertinent matters and situations.

This manual includes the intellectual property of Person Medical.

The contents of this manual can not be copied or reproduced in whole or

in part, without the prior approval of Person Medical.

These product standards and contents in this manual can be changed at

any time without advance notification for product development and

performance improvement.

2
Preface

Thank you very much for purchasing the products of Person Medical. To keep the function

normally for a long time, users should use the product safely and correctly. In addition,

it is very important to use this equipment after having enough understanding of function

operations and repair of the equipment. Please read the equipment manuals completely and

carefully before using this product. The products are made in consideration of the safety of

people who use this product and patients as well as the product's credibility. Therefore,

users have to keep the following matters in order to use it safely.

Matters that demand special attention for the safety

(1) Only qualified persons like doctors or nurses have to use this equipment.
(2) Absolutely do not renovate the product.
(3) Do not try to adjust the fixed parts because this product is already adjusted enough.
(4) Follow the order to assemble or disassemble the product. It's very important that users.
follow the order. If not, it may cause an electric shock, equipment damage, or malfunction.
(5) If the equipment has a problem, turn off the power supply right away. Contact the company
that we appoint. The phone numbers that you can get are in the front side and the back side of
the manual.
(6) If this equipment breaks down, search for the cause of the trouble according to the manual.
When the method to repair it in the manual is not available, do not try to repair it randomly.
Contact our company or the company that we appoint.

(7) Do not install this equipment in the following places:


* place which the surrounding temperature is below zero degrees Celsius or more than
40 degrees Celsius
* place which the atmospheric pressure is less than 700hPa or over 1060hPa
* place where there are some materials and furnishings which emit noxious gases
* place where temperatures are excessively high
* place where there is a lot of steam
* place where water is dripping through the ceiling
* place where there is a lot of dust and sand
* place where there is a lot of water vapor

3
* place exposed to explosive gas
* place where excessive turbulence or impact occurs
* place with slopes more than 0.3 degrees(5/1000 mm)
* place where power supply and voltage has strange changes
* place which the load for power supply and voltage excessively drops
* place that the direct rays of light shine
* place that there is inadequate ventilation
* place that has high humidity

(8) Turn off the power supply when a user cleans up and washes the equipment.
At this time, do not allow water to enter the equipment.
(9) Don't give impact to the equipment.
(10) If a user wants to electrically or mechanically connect our product to other company's equipment,
the user absolutely has to contact our company. We can't guarantee such attempt or randomly improved
products without prior notice for patient’s safety and performance products. Be careful of this point.
(11) Free service period of this equipment is one year (but, the exchange of parts due to the user's
carelessness and negligence is excluded from the free service).

4
Table of Contents

1. Situations that demand special attention for the use and safety ------------ P6

2. Use objectives and Outline of steam sterilizer 220L -------------------------- P6 ~ 8

3. Constituent elements of steam sterilizer 220L ----------------------------------- P8

4. Composition and Terms --------------------------------------------------------------- P9 ~ 14

1) Composition and function of the external appearance --------------------------- P9 ~ 10

2) Composition and function of the control panel ----------------------------------------- P11 ~ 14

5. Conditions and ways to install these equipment- ------------------------------- P15 ~ 18

1) Condition of Establishment ---------------------------------------------------------------- P15

2) Installation Drawing -------------------------------------------------------------------- P16 ~ 17

3) Way of Establishment ------------------------------------------------------------------- P17 ~ 18

6. Using method ------------------------------------------------------------------------------ P18 ~ 22

1) Preparatory matters before using -------------------------------------------------- P18

2) Cleaning and Packaging ------------------------------------------------------------ P19

3) How to Operate ------------------------------------------------------------------------- P19 ~ 22

4) How to manage the sterilized materials (items) ----------------------------------- P22~23

5) How to manage the sterilizer after completing the sterilization. -------------------- P23

7. Matters that require attention for use ------------------------------------------------ P23~ 24

8. Failures and countermeasures --------------------------------------------------------- P25 ~ 29

9. Solenoide Valve Assembly Diagram --------------------------------------------------- P30

10. Piping Diagram & Part Description ------------------------------------------------------- P31

11. Control Box & Wiring Box Assembly -------------------------------------------------- P32 ~33

5
1. Situations that demand special attention for the use and safety of the equipment

Steam sterilizer ( VSC-220L ) is equipment to sterilize the materials to be sterilized by generating


high pressure and high temperature steam inside of the sterilization chamber.
The users must use the equipment according to this procedure for personal life and the safety of property.
In addition, the following two precautions are very important factors that the users must keep.

note: The "note" indication is the matter that requires greater attention
of the users. So, they must use the equipment after knowing
"note" well enough.

Warning: Users can get physical trauma or shock if they disregard the
warnings when using this equipment. Therefore, they should use
this equipment after having a thorough understanding of the
contents of warnings.

2. Use objects and outline of steam sterilizer


a) Use objects
This is the medical equipment which sterilizes medical instruments by using high pressure and
high temperature of steam.
b) Outline of high pressure steam sterilizer
VSC-220L has a steam boiler in the inside of the equipment. The boiler supplies the steam of
high temperature and high pressure. Therefore, it sterilizes the materials to be sterilized by using
high temperature and high pressure steam. According to the kind of the materials,
the sterilization course is divided into low temperature sterilization of 121 ℃(1.0 kgf/cm2) and
high temperature sterilization of 134℃(2.1 kg/cm2). The whole course of sterilization is
automatically progressed. Low temperature sterilization is used for rubber products and liquid
sterilization. High temperature sterilization is used for sterilization of textiles and some medical
instruments.
The whole sterilization process is automatically controlled by the microprocessor and the monitor
displays various information about sterilization temperature, sterilization pressure, sterilization time and
drying time that occur during sterilization operation. This equipment has the self test function so that
the user can distinguish an error or alarm during operating it.

6
Minimum sterilization time for materials being used in hospitals

Kinds of materials Time needed for low Time needed for high
to Temperature sterilization Temperature sterilization
Packaging condition
be sterilized (120~123℃ ) (132~124℃)
To be packaged more than four layers
30 minutes 15 minutes
of cloth for storages
First, spread cloth on the tray. Second,
place the medical instruments on the
30 minutes 15 minutes
cloth. Third, cover the instruments loosely
with cloth and, lastly, sterilize them.
INSTRUMENTS Place some medical instruments and
porous medical apparatus on the tray. And
20 minutes 10 minutes
sterilize them in the situation that they are
not packaged
Place some medical instruments without
having porosity on the tray and sterilize 15 minutes 3 minutes
them
Sterilize rubber gloves in the state that they
20 minutes ×(transformed)
are packaged with cloth or paper.
There are catheters, drains, and tubes
having moisture in their holes.
20 minutes 10 minutes
They should be sterilized in the situation
RUBBERS
that they are not packaged.
There are catheters, drains, and tubes
having moisture in their holes.
30 minutes 15 minutes
They should be sterilized in the situation
that they are packaged.
First, disassemble needles and syringes.
Needle & And, sterilize them in the situation that
30 minutes 10 minutes
Syringes they are packaged with some cloth or
paper.
PLASKED 75㎖ ~250㎖ 20 minutes
SOLUTION
500㎖ ~1,000㎖ 30 minutes -
(Liquid
Sterilization) 1,500㎖ ~2,000㎖ 40 minutes

Sterilize them in situation that they are


30 minutes 10 minutes
packaged with cloth or paper
Dressings
Sterilize them in the state that they are put
30 minutes 10 minutes
into cans or sterilization containers

7
Sterilize it in the state that it is packaged
Treatment Tray 30 minutes 10 minutes
with cloth or paper.
Pack ( size of package : below 12×12×20
Linen 30 minutes ×
inches)
Sterilize them in situation that they are not
15 minutes 3 minutes
packaged
Utensils
Sterilize them in situation that they are
10 minutes 10 minutes
packaged with cloth or paper.
Sutures, Silk Sterilize them in situation that they are
30 minutes 10 minutes
Cotton, Nylon packaged with cloth or paper.

3. Constituent elements of Vacuum Speed Clave-220L


1) Product Name, Model Name: large size high pressure steam sterilizer (VSC-220L)
2) Manufacturer Name: PERSON MEDICAL Co., Ltd.
Manufacturer Address: 47-4, Gongdan-ro 140Beon-gil, Gunpo-si, Gyenggi-dor, Korea
3) Permit Number: 09-922
4) Weight and Packing Unit: 470kg
5) A form and degree of protection against electric shock: first class machinery Type B machinery
6) Phase constant, Voltage Rating, and Frequency:
* steam generating device: three phase, AC380V, 60Hz
* control device: single phase, AC 220V, 60 Hz
7) Electric Power Consumption: * steam generating device: 12,000 W * control device: 1,500 W
8) Storage Method: Storage in room temperature
9) Specifications
(1) Overall size: (W)740mm×(H)1,722mm×(L)1,460mm unit: mm
(2) Chamber size: Ø 530(Dia)×1,000(L)mm 220 Liter

(3) Pressure range: 1.0~2.2 kgf/㎠

(4) Temperature range for use: 121℃~134℃


(5) Sterilization time: 1~60 minutes
(6) Drying time: 1~60 minutes

(7) Weight: 470 kg

(8) Control Method: the control of microprocessor

*This product is medical equipment.

8
4. Composition and Terms
1) Composition and function of the external appearance

9
1. Control panel: This control panel operates equipment. And it controls the course progress
of sterilization process.
2. Power supply switch: power supply switch for supplying power to the main body
3. Printer: It records the whole sterilization process and prints it. (option)
4. Pressure gauge: device marking the pressure inside the jacket through graduation gauge.
5. Compound gauge: device marking the pressure inside the chamber through graduation gauge.
6. Front cover: It protects the front part of the equipment.
7. Equipment circle handle: device that the door can stick very tightly to the chamber by turning the
handle when opening and closing the door
8. Door cover : external appearance cover protecting the outside of the door.
9. Bottom cover of main body : device that can open and close when checking the bottom interior
of the main body.
10. Caster for moving : device that is being used for the movement of the equipment
11. Chamber : pressure container that keeps the pressure in the chamber and sterilizes the materials
to be sterilized
12. Door: It seals chamber and keeps the pressure in the chamber.
13. Tray: rack for the materials to be sterilized
14. Exterior covers: It protects the exterior equipment.
15. Device for generating steam: There is a heater inside the chamber. This is a device that generates
steam after heating water.
16. Water supply connector: the connector supplying water to the boiler.
17. Drain connector for steam and water: the connector connecting steam and water that
the equipment exhausts to the outside.
18. Electrical terminal box: terminal box listed parts to operate electrical parts.
19.Nameplate manufacturers: nameplate that marks the manufacture's serial of sterilizer and
Further information

10
2) Composition and function of the control panel

2.LCD Display: This displays sterilization pressure, sterilization temperature, sterilization time and

drying time while operating this equipment. In addition, this displays the process

[ Vacuum > Steam Supply > Sterilization > Exhaust > Dry > Completion ]

and the quantity of water of steam generator in three steps.

2. Condition Lamp: This displays if the temperature of jacket rises until the proper temperature.

3. Vacuum Lamp: This lamp displays vacuum process and steam supply process during the progress.

4. Sterilization lamp: This lamp displays sterilization process during the progress.

5. Exhaust lamp: This lamp displays exhaust process during the progress.

6. Drying lamp: This lamp displays drying process during the progress.

7. Complet Lamp: This lamp displays the completion of the progress.


8. Fall lamp: This lamp displays the error occurring during a ready state and the progress.
9. PROGRAM1(134℃) button/display lamp: The user uses this button when the user chooses
packed materials to be sterilized and medical instruments.
10. PROGRAM2(121℃) button/display lamp: The user uses this button when the user uses kinds of
rubbers and heat sensitive materials to be sterilized.
11. PROGRAM3 button/display lamp: The user uses this button when the user sets a random time.
12. UP button : The user uses this button when the user sets up the increase of sterilization temperature,
sterilization time, and drying time.
13. DOWN button: The user uses this button when the user sets up the descent of sterilization temperature,
sterilization time, and drying time.
11
14. ENTER button: The user uses this button when the user does the movement setup about sterilization
temperature> sterilization time> drying time.

15. VACUUM TEST button/display lamp: Lamp choosing and displaying vacuum leakage test

16. PRINTER button/display lamp: lamp choosing and displaying output, movement, and stop of printer.

17.START and STOP button: button choosing start and stop of progress

------------------------------------------------------------------------------------------------------------------------------------------

5. Explanation about how to operate high pressure steam sterilizer


◆ If a user presses mode button, Program Mode 1,2,3 is set
in consecutive order and the user sets program mode
according to the type of material to be sterilized.

Choice of MODE-1 (134℃)

Sterilization Sterilization Sterilization


SELECT Drying time
pressure temperature time
MODE-1 2.1 Bar 134 ℃ 10/20/30 min 10/20/30 min

materials to be
kinds of cottons, metal instruments, and packed products.
sterilized

MODE-1 is used when sterilizing materials that need high temperature sterilization method.
Choice of MODE-2 (121℃)
Sterilization Sterilization Sterilization
SELECT Drying time
pressure temperature time
MODE-1 1.0 Bar 121 ℃ 15/20/30 min 10/20/30 min

materials to be rubber gloves and kind of rubber tubing


sterilized

MODE-2 is used when sterilizing materials that need low temperature sterilization method.

Choice of MODE-3(121~134℃) and the exclusive dry program


MODE-1 and MODE-2 are fixed programs and MODE-3 has two kinds of program functions.
They are the program that the user can use after he/she establishes it randomly and the program that
the user can use for the dry only.
12
Sterilization Sterilization Sterilization
SELECT Drying time
pressure temperature time

MODE-3(1) 1.0~ 2.1 Bar 121~135 ℃ 5 ~ 30 min 0 ~60 min

MODE-3(2) - - - 0~60 min

To use the dry exclusive program, the user can choose the program of MODE-3.
If so, the dry only program will operate during a set time.

How to use Program Mode-3


1) Program that the user can set

① The user presses the select button and chooses the MODE-3 (LED lamp lights up.)
② If the user presses ENTER button, the cursor will appear on the sterilization temperature in LCD
③ display window. At this time, the user sets up the temperature range that he or she wants,
pressing "up" button or "down" button (121 ~ 134℃). Ex 132℃
If the user presses ENTER button, the cursor will move to the sterilization time.
At this time, the user sets up the sterilization time, pressing "up" button or "down" button (5~30
minutes). Ex. 10 minutes
④ If the user presses ENTER button, the cursor will move to the drying time. At this time, the user sets
up the drying time, pressing "up" button or "down" button.(0~60 hours). Ex. 10 minutes

2) Dry Exclusive Program


◆ The user presses the select button and chooses MODE-3. At first, the mode for user settings
is displayed. If the user presses the select button one more time, the Dry program will be chosen.
At this time, sterilization time is displayed as “0” and the drying time is displayed.
The user can establish the drying time in the following order.
ENTER - > UP/DOWN -- > ENTER ( The drying time can be adjusted between 1 minute to 60
minutes.)

TEST PROGRAM
VACUUM TEST : This is vacuum leak test program. First, the user chooses
VACUUM TEST with select button and presses START button.
If so, the vacuum test progresses in the chamber.

13
In the state that the vacuum of sterilization chamber is kept at -0.5bar for
Progress program 15 minutes, the change in the pressure should be within 10% of
the established vacuum (maximum degree of vacuum x 0.1%).

The user checks the change of vacuum degree established through the
User confirmation
cycle operation of vacuum leak test.

Button for Printer Choice


If the user presses the button for printer choice, he/she can get the data in
progress process through the printer while the sterilization circle is being
progressed. If the user doesn’t want the data, press the printer choice button
one more time. And if the user turns off the lamp for printer choice,
the output will be stopped.

START/STOP button
Start and stop button is button for start and stop of sterilization program.
In the preparatory state, START function will be carried out if the user presses
this button. But, if the user presses STOP button in progress, all progress process
will be stopped

5. Conditions and ways to establish these equipment


1) Conditions to establish
① For safety in use, the equipment should be established after the sterilizing room for the
Equipment is prepared in advance.
② This product generates high temperature and high pressure. Therefore, it should be established
in the place where ventilation is very good.
③ Avoid direct sunlight. The users should not keep or use inflammable gas or liquid around
the places where the equipment is established
14
15
2) Installation Drawing

16
Electrical Installation Requirements

1) This product needs the electric line voltage of AC380V, three-phase four-wire system( L1,L2,L3,N).
Install the terminal box at the location of about 1.5m from the floor around the area that the equipment
is installed.
2) Install the 4 pole circuit breaker having more than 30A current capacity inside the terminal box for
exclusive sterilizers. ( Power consumption of this product: Max, 15,000W (15.0KW)
Power requirement: Max, 14,000W (14.0KW)

Plumbing Equipment Facilities


1) Water Supply Facilities
This product needs the water supply when it is installed because an electric boiler is built in. Therefore,
about Ø 15 water supply line should be installed in the back of the equipment. The water supply should be
used for the sterilizer only. Also, a valve should be connected for safety.
2) Drain Facilities
The electric boiler generates steam while the use of electricity is allowed. Steam or water is discharged
through the drain line intermittently. Therefore, the drain more than Ø 40 should be installed in the back of
the equipment. Also, this drain should be used for the sterilizer only. This drain should be connected to
sewage ditch (drainage ditch) separately if possible. It should be below 100mm from the floor.
Copper pipe is safe as quality of material (Pvc plastic pipe is not suitable for the drain pipe because of
high temperature steam and water. Therefore, it should not be used.).

3) Ways to establish
(1) Move this product to the place to be established. When you move it, use the moving equipment
because the weight (more than 470 kg) of the product is too heavy.
(2) An expert engineer should establish this product by the order of installation manual.
(3) The level floor that the equipment will be established should be kept in the horizontal position.
(4) This equipment should be placed more than 400mm away from the wall for ventilation and
the best follow-up service.
(5) This equipment should be fixed at the place where it is installed. Also, the fixed feet should be fixed
on the spot.
(6) Open the cover of the control box lying on the back of the equipment. Next, the socket (terminal) of circuit
breaker and the circuit breaker installed against the wall should be connected to the electrical cable
(the electrical cable that is more than a thickness of 10 SQUARE should be used ).
(7) If the electrical work finishes, the water supply pipe in the equipment and the water supply line in the wall
should be connected by Ø 15 stainless pipe or pipe having equal internal pressure and heat resistance.

17
After they are connected, the engineer should check the water leakage after turning on the city water.
(8) If the plumbing for the water supply line is completed, the drain part of the product and the floor drain
should be connected by Ø 40 stainless pipe or pipe having more than equal internal pressure and heat
resistance.
(9) If all the other electrical system and the connection of the drain line are completed, turn on the power
supply switch and check if the boiler water supply is normally working well.
(10) The ground connection should be connected certainly.
--------------------------------------------------------------------------------------------------------------------------------------------

6. Use Method
1) Preparatory matters before using

① Have air change in the room where the equipment will be established to keep the atmosphere fresh.

② Open the door of the chamber and clean up the bottom in the chamber ( Remove foreign substances

after cleaning up the bottom with a wet rag ).

③ Check to see if the circuit breaker in the terminal box is turned on.

If it is turned off, it should be turned on.

④ Check to see if the valve for water supply is open. If it is closed, it should be open.

⑤ After power supply is turned on, check to see if the boiler water level keeps level 3 on the LCD monitor

( If the water level in the tank is low, water is automatically supplied to the boiler by the supply pump.

And if the boiler water level is more than level 2, the boiler heater will work and preheat).

⑥ The user opens the door of the sterilizer, loads the materials to be sterilized into the tray safely,

and puts it in the tray rack.

⑦ When the user closes the door, check to see if the materials got stuck at the door.

And check if the door is closed tightly.

⑧ Read the manual to know how to use before using the equipment.

⑨ This equipment generates high temperature and high pressure. Therefore, only the person in charge

should use this equipment.

--------------------------------------------------------------------------------------------------------------------------------

18
2).Cleaning and Packaging
◆ The user should wash the medical instruments right after using them. If they are not washed for a long time,
dirty things or impurities are coagulated and are not easy to be dissolved or cleaned up.
So, the user should use only exclusive detergent and dry them after removing water drops.
And, after the medical equipment or medical instruments are wrapped with sterilization packing or
cloth sewing, the user should load them into the sterilizer.

◆ Textile and medical protective clothing should be dried completely after they are washed. Also, they should
be wrapped by sterilization packing or cloth sewing. When medical instruments are loaded into the sterilizer,
they should be loaded on the exclusive tray. The packaged cotton should be stood up so that the steam can
penetrate well into the materials to be sterilized. This loading method can increase the effect of complete
sterilization and dry.

◆.The liquid type sterilization is safe to use exclusive sterilization container. Borosilicate glass bottles are
very suitable for use as liquid sterilization containers because borosilicate glass is resistant to high
temperature steam and pressure well. Just plastic bottles and glass bottles can be broken with ease and
transformed during sterilization. So, the user shouldn’t put such things into the sterilizer. Sterilization
containers should be sterilized with the covers open. After sterilization, the liquid may boil over or the
containers may be broken if the user suddenly opens the door of sterilizer.
Therefore, the user should open the sterilizer door if the inside temperature of the sterilizer goes under 70 ℃
to avoid the damages.
--------------------------------------------------------------------------------------------------------------------------------
3).How to Operate
(1) Turn on the electric power ( power switch should be in the “on” position)
(2) Turn the door handle left to open the door (before opening the door, check to see if the chamber
pressure is in the “0” position).
(3) Put the medical instruments into the chamber.
(4) Turn the door handle to the right to close the door (check to see if the monitor displays “Door:[close]”
(5) Choose the sterilization program according to kinds of materials loaded into the chamber.
Ex: Choice of machinery or packaged textile : Program Mode 1
Rubber gloves or kind of silicon tube: Program Mode 2
(6) Check if the jacket (boiler) pressure is preheated enough before pressing the start button.

When program mode-1 /2 is used, jacket preheating: more than 2.0 kgf/㎠

If jacket pressure is preheated enough, press the start button.


Sterilization process is automatically progressed in the following order:
19
Condition (preheating) Vacuum Sterilization- Exhaust  Dry complete
Auto process.

----------------------------------------------------------------------------------------------------------------------------

(7) [“Condition”] Preheating Process


As a preheating step of jacket (boiler), the condition lamp lights if the pressure and temperature of
boiler increases enough. If the user presses the start button in the state that the condition lamp doesn’t

20
light, the monitor displays the message of “ERROR-14.” After the user resets the error, he/she should wait
until the boiler pressure rises.

(8) [“Vacuum”] Pre-vacuum Process


As a pre-vacuum step, the air or the state inside the chamber is reduced until -0.75bar
by vacuum device operation. And, the steam in the jacket is supplied into the chamber until
+0.5bar. After that, the state inside the chamber is reduced until -0.5 bar by vacuum device
operation again. This is the process that the steam is supplied in the state that the air inside
the materials is completely removed. Therefore, the effect of perfect sterilization can be realized.
The vacuum pulse is composed of 3 times. At the final step, if steam is supplied into the chamber
until established pressure, the sterilization step proceeds.

(10)..[“Sterilize”] Sterilization Process


If the temperature and pressure reach established sterilization temperature and pressure,
the sterilization process is realized. To keep established sterilization temperature and pressure,
the temperature and pressure inside the chamber during the sterilization time are controlled by
the intermittent inflow of boiler steam. This process is continued during established sterilization time.

(11)..[“Exhaust”] Exhaust Process


If the sterilization process finishes, exhaust process begins. Exhaust process is the process that
the pressure and steam inside the chamber are discharged. This process is continued until the pressure of
21
chamber is air pressure “0.0”.

(12).. If exhaust process finishes,


the dry process proceeds. Steam in the chamber is discharged by the vacuum device forcibly for 5 minutes.
After 5 minutes passes, inflow of vacuum and air repeatedly proceeds and the dry process is realized.

(13).. [“Complet”] Completion Process


If the dry process completes, the Complet LED lights up. So, all sterilization process completes.
The pressure of the chamber keeps 0.0 bar. At this time, the complete sound rings for one minute.
If the user presses STOP, the sound stops.

(14).. FAIL
If the user presses the STOP button randomly during operation, or if the error occurs because of unsafe
conditions of operational environment during operation, “FAIL” led lights up. For initialization,
press the STOP button.
If all process has completed, open the door and take out the sterilized
Materials from the chamber.
◆ At this time, the user should check if a little bit of steam or humidity in the

Chamber leaves. If so,the user should try again only the dry process with
Program Mode-3 because the dry time lacks for this process.Never try to open
the door during operation.
It causes problems like burn.
 Open the door after checking if the pressure gauge guide is located at “0.”
 When the user loads or takes out the materials, handle the materials after wearing protective gloves and
a protective gown.
-----------------------------------------------------------------------------------------------------------------------

4)..How to manage the Sterilized Materials (Items)


 If all sterilization process has completed, open the door and take out the materials.If the user finds
the materials having water drops or excessive humidity inside the chamber when he opens the door,
he/she has to extend the drying time for the materials. In the state that there are some water drops
and excessive humidity inside the chamber, do not take out the materials from the chamber.
It is because the materials can be polluted again by air or dust after the moisture has been cool.

● The completely sterilized materials must be kept in the exclusive depository blocking the influx of outdoor
air. This depository should be set up at the place where patients and outsiders don't enter.

22
● A user must surely check the expiration date of sterilized materials before using the sterilized materials
stored in the exclusive depository. However, if the user finds something wrong with the materials,
he/she should sterilize them again.

5) How to manage the sterilizer after completing the sterilization


● After taking out the sterilized materials from the chamber, the user should remove foreign substances
in the bottom of the sterilizer. If the foreign substances remain as they are in the inside of the chamber,
they can cause the product troubles because of clogged pluming when the sterilizer operates.
● When the power supply of sterilizer turns on, the chamber keeps high temperature condition.
If the sterilized materials stay in the chamber continuously, they can be transformed.
Therefore, the user should keep the materials in the separate storage box to avoid it.
● The user should clean the inside of the chamber with a wet duster. But, the user should not necessarily
use the stainless steel scouring pad because it may cause the product damage or breakdown.
A user should clean the tray at least once every two weeks with soft detergent.
The user should load the tray into the chamber in a completely dry condition

● A user should turn the power supply off after using the sterilizer.

----------------------------------------------------------------------------------------------------------------

7. Matters that require attention for use


 Because this equipment runs at a substantially higher temperature, the user should consider
users' safety at all time. He/she should also follow the use procedure in the manual.
1) This product is a large size sterilizer. We ask the user to establish and use it in an exclusive room for
this sterilizer,VSC-220.
2) When the user opens and closes the door of the equipment, he/she must check whether pressure gauge
guide displays ” 0.0”.Bar
3) When the user loads the materials to be sterilized into the chamber, the user should check whether they
are dry enough. So, do not put the sweat materials into the chamber.
4) When the user loads the materials to be sterilized into the chamber, the user shouldn't accumulate them
from the bottom to the top. If possible, load the materials with making them stand up from the left to
the right.
5) A user should wear safety gloves. Because the sterilizer keeps high temperatures during and after using it,
there is a strong possibility of burning.
6) The examination, adjustment, and repair of sterilizer should be checked by a qualified person or
an experienced user who got the education or the training by the manufacturer or its agency.
7) A user should not disassemble or remodel the equipment.
23
8) When the equipment got a breakdown, the user should attach the breakdown warning sign on the
equipment in the case there is no a qualified expert. And, he or she should get services the manufacturer
or medical equipment expert.
9) Before the user or the expert repair the sterilizer, he/she should remove the power cord in advance.
After the equipment gets a cool down to the room temperature, they should fix the sterilizer.

10) Use the equipment only the person in charge or medical equipment expert.
11) When a user sterilizes the packaging materials, do let the exterior parts of the pack not to touch
the walls of the sterilizer room.
12) A user must not sterilize explosive, volatile, flammable, or toxic materials.
13) A user must keep the following factors for the sterilization of liquids.
① Use porous lids. Do not use screw caps or rubber stoppers.
② Use only borosilicate glass bottles. Do not use normal glass bottles or containers that are not made for
sterilization.
③ Do not open the sterilizer door widely soon after the sterilization cycle is complete.
Just wait about 10 minutes with the sterilizer door a little bit open.
④ Do not shake or move a hot bottle. It might burst the bottle
14) After using the equipment, clean the outside of the sterilizer and the inside of the chamber all the time.
15) Do not set up this equipment on the outside of a building that temperature change often happens
(It can cause the occurrence of errors).
16) Avoid installing in places exposed to direct sunlight. And, do not set up the equipment in places where
high temperatures occur.
17) The equipment must be set up in the inside of a building having a good flow of ventilation and in the
places where patients and people don't often pass through.
18) The sterilizer must absolutely have ground connection for use. A user should turn off the power
when it is not used.
19) Operating environmental conditions: relative humidity ranges(30~75℃),
surrounding temperature ranges(10~40℃), atmospheric pressure ranges
(70~106kpa)

24
8. Failures and Countermeasures
1) Occurrence of Errors
If an error occurs while the equipment is working, the user should follow the following countermeasures.
Do not try to disassemble or repair the equipment by force.
-----------------------------------------------------------------------------------------------------------------------------------------
Error-01 : Perception of water level in steam generating device (boiler)Sensor disorder or sensor
malfunction
User : Inquiry to manufacturer or agency.
Engineer : Operate it again after discharging water which is inpoured into the boiler
First, disassemble the water level tank. Check it in the following order.
-Check if the level of step 3 on the monitor is being marked, moving circle type of air bladder of
the water level above and below. In the state that water level is moving, replace the air bladder
if there is no change of level on the monitor.
-Check if some sediments or scales are inside the water level tank. Operate it again after
removing them if they exist there.
-Separate the connector of the main control board. If the user uses the multi-tester,
he/she can check the point between above and below when the air bladder moves.
Next, replace it with a new one if it has a problem.
---------------------------------------------------------------------------------------------------------------------------------------
Erro-02 : Heater overheating inside the steam generating device (boiler):
(temperature sensor TS3 perceives that it exceeded 142 ℃)
User : First, turn off the power supply. After 10 minutes, turn on the power supply.
Be sure to check whether or not the water level of boiler is over step 3 Also, check
if preheating system works normally.
Engineer : Check if water into the boiler is being supplied normally. ( In lower water level step,
check if water supply pump works normally.) Check the heater temperature sensor (TS3).
If it has a problem, replace it with a new one ( when the boiler pressure is 2kgf/cm2,
temperature range is marked as 132~135 ℃)
---------------------------------------------------------------------------------------------------------------------------------------
Error-22: Jacket temperature has exceeded the desired (set) temperature. (temperature sensor TS2
Perceives that it exceeded 142℃)
User : First, cool the equipment enough. After that, operate it again .
Engineer : When jacket pressure is 2.0bar, temperature range should be between 132~135℃
If temperature is higher than pressure, decrease the temperature as turning the VR resistance R7
of main board to the right .If temperature and pressure has risen over 2.5 Bar, check
the temperature sensor TS2 of steam generating device.

25
-----------------------------------------------------------------------------------------------------------------------------------------
Error-03 : Bad door lock condition (malfunction)
User : -Check if the door is fully closed.
-Check if the monitor displays the door message of “Door[CLOSE]” in the state that
the door is closed.
Engineer : -Check DOOR sensor. If it has a problem, replace it with a new one.
-Check if the interval between the sensor and DOOR PLATE is proper. (Adjust the interval of
Door sensor, closing the door and checking the message Door[CLOSE] on the monitor.)
-Check if the Door sensor normally perceives as using the multi-tester. If it has a breakdown,
replace it with a new one.
-----------------------------------------------------------------------------------------------------------------------------------------
Error-04: Deviation of Sterilization Temperature,
TS1 temperature sensor has exceeded established sterilization temperature (+3℃).
User : -Check if the materials to be sterilized are more than 70% inside the chamber.
If they are over than 70%, remove them under than 70% inside it. And, operate it again.
Engineer : -Check if chamber pressure is higher than the established sterilization temperature and pressure.
Chamber sterilization pressure should keep 1.9~2.0bar when sterilized at 134℃. But, Some error
occurs if it continually rises over 2.2bar.Check if steam is put into the inside of chamber in the
state that solenoid valve SV1 is off. After user checks it, replace it with a new one
if it has a problem.
------------------------------------------------------------------------------------------------------------------------------------------
Error-40 : Sterilization temperature deviation
TS1 temperature sensor has decreased under established sterilization temperature (-3℃)
User: -Check if the materials to be sterilized are more than 70% inside the chamber.
If they are over than 70%, remove them under than 70% inside it. And, operate it again.
-Check if DRAIN filter inside the chamber has foreign substances. If so, wash and remove them.
And operate it again.
Engineer : During sterilization, some error occurs if steam is continually exhausted owing to the
breakdown of pipe line or parts.
-The steam trap (TR) discharges steam intermittently. If it has some problem or sediments inside it,
it can exhaust steam continually. If it has some problem, replace it with a new one.
-After checking solenoid valve SV2 and SV6, check if steam exhaust occurs during sterilization.
Replace it with a new one if the valve has a problem.
-Check the chamber temperature sensor(TS1) (when chamber pressure is 1.9~2.0bar,
the temperature range of temperature sensor TS1 is marked at 133~135℃.
If the temperature is marked under 133~135℃, increase the temperature by turning the VR

26
resistance R7 of main board to the left. Also, adjust it to be134 between 1.9~2.0bar.
-------------------------------------------------------------------------------------------------------------------------------------
Error-05 : Water Level : step 1
(Delay of water supply time to the steam generating device (boiler). (5 minutes))
Water Level : step 2
(Delay of water supply time to the steam generating device (boiler). (1 minute))
Use : -After setting the equipment, turn it off when the user operates it first. And operate it again.
-Turns off the electric power. After 10minutes, turn on the power supply. Operate it again.
Engineer : -Check if the pump for water supply normally works.
-Check if FUSE(AC220V,10A) of main board is disconnected. If it is disconnected,
replace it with a new one.
-The pump for water supply and SV5 works at the same time. Check if SV5 normally works.
If water pressure being supplied is over 5bar, the closed part of the interior of SV5 might get
some damage. If the water pressure is over 5bar, a reducing valve should be established to
faucet (place that water is being supplied)
-Check the water supply pump if some error occurs only if jacket pressure is over 1.0bar.
In the state that the pump doesn’t operate, some foreign substances occurs in the CK2,CK3
valve between water supply pump and steam generating device. if the head part of water
supply pump is getting hot. So, hot water might get back to the pump. If so, disassemble
CK2,CK3 valve and wash it. After that, operate it again.
---------------------------------------------------------------------------------------------------------------------------------------
Error-06: In the course of steam supply, the steam supply in the chamber has been delayed over
30minutes.
User : -Check if the jacket pressure is preheated enough. After that, operate it again.
(Program Mode-1: 2.0 Bar and over)
(Program Mode-2: 1.0 Bar and over)
Engineer : -Check if the solenoid valve(SV1) for steam supply is normally working.
-Check if the steam trap (TR1) and solenoid valve (SV2,SV6) discharges steam excessively.
-------------------------------------------------------------------------------------------------------------------------------------------
Error-61 : The steam generating time of the steam generating device (boiler) has been delayed over
60minutes
User : Turn off the power. After 5 minutes, turn it on again. And check if the jacket pressure rises.
Engineer : As using CLAMP METER , user can check if 3 Heaters have the current of each 13 Ampere.
Also, as using resistant measuring instrument, user can check if the resistivity of both sides of
heater measures 16 ohm. If the heater has been disconnected, replace it with a new one.
----------------------------------------------------------------------------------------------------------------------------------------

27
Error-07 : The chamber temperature sensor (TS1) has malfunction. (disconnection in it or it has
a short circuit)
User : After turning off the equipment, operate it again. If the same error occurs again,
Contact after sales service center.
Engineer : - Check chamber temperature sensor. replace it with a new one if it has a problem.
-Check the sensor entry part of the main board. If there is something wrong with the part,
repair it or replace it with a new one.
------------------------------------------------------------------------------------------------------------------------------------------
Error-08 : The jacket temperature sensor(TS2) malfunction.
(disconnection in the sensor or it has a short circuit)
User : After turning off the equipment, operate it again. If the same error occurs again,
contact after sales service center.
Engineer: -Check the jacket temperature sensor. If it has a problem, replace it with a new one.
-Check the sensor entry part of the main board. If it has a problem, repair it or replace it
with a new one.
---------------------------------------------------------------------------------------------------------------------------------------
Error-81 : Boiler temperature sensor malfunction
(disconnection in the sensor or it has a short circuit )
User : -After turning off the equipment, operate it again. If the same error occurs again,
contact after sales service center.
Engineer : -Check the boiler temperature sensor. If it has a problem, replace it with a new one.
-Check the sensor entry part of the main board. If it has a problem, repair it or replace it with
a new one.
--------------------------------------------------------------------------------------------------------------------------------------
Error-09 : Chamber pressure sensor(PS1) malfunction
(disconnection in the sensor or it has a short circuit )
User : - After turning off the equipment, operate it again. If the same error occurs again,
contact after sales service center.
Engineer: - Check the sensor entry part of the main board and pressure sensor. If it has a problem,
repair it or replace it with a new one.
---------------------------------------------------------------------------------------------------------------------------------------
Error-10 : Vacuum leakage test malfunction (fail)
User : Check if the door gasket has a breakdown or some damage. If they have problems,
have after sales service enquiry.
Engineer : -Check the door gasket. If it has a problem, replace it with a new one.
-Check if outside air inflows into the chamber through Check valve(CK1,CK4).

28
If it has a problem, disassemble it. And wash or replace it.
-Check pipe lines connected to the chamber. If they have problems, disassemble and assemble them again.
----------------------------------------------------------------------------------------------------------------------------------
Error-11 : While having the vacuum test, the vacuum arrival (-0.7 bar) time has exceeded 10 minutes.
User : - If jacket pressure is over 2.0bar, operate it again.
-After checking the state that the door is fully closed, operate it again.
-Check if door gasket has some problem or damage. If it has some problem, have after sales service enquiry.
Engineer : -Check if solenoid valve(SV6) normally passes steam.
-Check if solenoid valve(SV6) is turned on.
-Check if steam and water is exhausted well through DRAIN LINE.
--------------------------------------------------------------------------------------------------------------------------------------
Error-12 : Vacuum removal time has been delayed (5minutes).
User : -Cool the equipment enough and operate it again.
-Have after sales service enquiry. (Ask for A/S to the manufacturer)
Engineer : -Check if the solenoid valve(SV3) for vacuum removal normally works.
-Check if the air filter for air inflow normally works without problems. If it has a problem, replace it
with a new one.
-----------------------------------------------------------------------------------------------------------------------------------------
Error-13 : During the whole process, the pressure in the sterilization chamber
has exceeded over 2.4bars.
User : After turning off the equipment, operate it again. If the same error occurs again,
have after sales service enquiry.
Engineer : -In the state that the door is open, check if the monitor pressure is marked at 0.0Bar.
If the pressure is higher than 0.0 or the pressure occurring when water passes is marked,
user can adjust 0.0bar by turning the pressure adjustment resistance VR(R11) of main board.
If some error occurs in the state that the equipment is not operated, the pressure sensor has a
breakdown or the pressure sensor entry part of the main board might have some problem.
If some error occurs during sterilization course, check if pressure rises as steam is put into
the chamber in the state that solenoid valve is off.
------------------------------------------------------------------------------------------------------------------------------------
Error-14: When the equipment starts, jacket temperature(TS2) is lower than established temperature 5℃
User : - Before user operates the equipment, the jacket (boiler) should be preheated enough
Therefore, the user should use it after enough preheating jacket pressure as follows before he/she
presses the start button
(Program Mode- 1 : 2.0 bar and over)
(Program Mode- 2 : 1.0 bar and over )

29
9. Solenoide Valve Assembly Diagram

30
10. Piping Diagram & Part Description

31
11. Control Box & Wiring Box Assembly

32
PERSON MEDICAL Co., Ltd.

Address: 47-4, Gongdan-ro 140Beon-gil, Gunpo-si, Gyeonggi-do, South Korea


Tel: +82-31-459-7152, Fax.:+82-31-459-7156,
URL :http://wwww.personmedi.co.kr
webmail: personmedi@personmedi.co.kr

33

You might also like