Professional Documents
Culture Documents
5S Implementation Plan at Work Place
5S Implementation Plan at Work Place
To do Who ? When?
What ? Where? Team Leader Team Members P-D-C-A Jul-07 Aug-07 Sep-07 Oct-07 Nov-07 Dec-07
S0 = Enablers
[Motivate
people for 5-S
implementation] Plan S0 S1 S2 S2 S3
S1 = Seiri
[Sort out
what is needed
Gemba-1:
and what is not]
S2 = Seiton
[Do
systematic
Actual S0
arrangement for
all needed
S3 = items]
Seiso
[Ensure
spic & span
cleanliness with Plan S0 S1 S2 S2 S3
inspection]
S4 = Seiketsu
[Create a
highly
standardised Gemba-2:
workplace] Actual
S0
S5 = Shitsuke
[Self - discipline
at workplace]
Department
Jan-08 Feb-08 Mar-08 Remarks Why ? MOP
0
Scores can be 1/ 3/ 5 for low / Med / High categories repectively & Pref. no
will be in descending order of total score
Item with pref. no "1" should always be the easiest accesible and further on
Score
1S Check Item Description
0 1 2 3 4
Materials / parts Does the inventory or in-process inventory include unneeded mtrl / parts
SEIRI
Score
2S Check Item Description
0 1 2 3 4
Location Indicators Are shelves and other storage areas marked with addresses
SEITON
Item Indicators Do the shelves have signboards showing which items go where
Qty. Indicators Are Max / Min Inventory levels indicated
Walkway Demarcation Storage areas / Process Area / Units marked
Sub Total 0 0 0 0 0
Score
3S Check Item Description
0 1 2 3 4
Floor / Work station Are floors / work station shiny to spot any waste
SEISO
M/c & Equipments Are they Dust free, running healthy with allowed noise / vibration
Cleaning Stewards Is there a dedicated staff / do they do it voluntarily
Sub Total 0 0 0 0 0
Score
4S Check Item Description
0 1 2 3 4
Improvement Idea Is any action plan in place for its deployment
SEIKTSU
Score
5S Check Item Description
0 1 2 3 4
Equipments / Process Are they easily gettable / managable
SHITSUKE
Grand Total 0
SEIRI 0
SEITON 0
SEISO 0
0 SEIKTSU 0
SHITSUKE 0
Audit Result
0 SEIRI
1
SHITSUKE SEITON
0
SEIKTSU SEISO
0
0